WorldWideScience

Sample records for primary loop pipeline

  1. WWER type reactor primary loop imitation on large test loop facility in MARIA reactor

    International Nuclear Information System (INIS)

    Moldysh, A.; Strupchevski, A.; Kmetek, Eh.; Spasskov, V.P.; Shumskij, A.M.

    1982-01-01

    At present in Poland in cooperation with USSR a nuclear water loop test facility (WL) in 'MARIA' reactor in Sverke is under construction. The program objective is to investigate processes occuring in WWER reactor under emergency conditions, first of all after the break of the mainprimary loop circulation pipe-line. WL with the power of about 600 kW consists of three major parts: 1) an active loop, imitating the undamaged loops of the WWER reactor; 2) a passive loop assignedfor modelling the broken loop of the WWER reactor; 3) the emergency core cooling system imitating the corresponding full-scale system. The fuel rod bundle consists of 18 1 m long rods. They were fabricated according to the standard WWER fuel technology. In the report some general principles of WWERbehaviour imitation under emergency conditions are given. They are based on the operation experience obtained from 'SEMISCALE' and 'LOFT' test facilities in the USA. A description of separate modelling factors and criteria effects on the development of 'LOCA'-type accident is presented (the break cross-section to the primary loop volume ratio, the pressure differential between inlet and outlet reactor chambers, the pressure drop rate in the loop, the coolant flow rate throuh the core etc.). As an example a comparison of calculated flow rate variations for the WWER-1000 reactor and the model during the loss-of-coolant accident with the main pipe-line break at the core inlet is given. Calculations have been carried out with the use of TECH'-M code [ru

  2. Full instantaneous traversal rupture of the primary loop pipeline

    International Nuclear Information System (INIS)

    Baytelesov, S.A.; Kungurov, F.R.

    2010-01-01

    Accident, reflecting full immediate cross rupture of primary loop pipe of WWR-SM research reactor of INP AS RUz is observed in this paper. Calculations for accident situation and analysis for different reactor cores, formed from fully IRT-3M type high enriched fuel (36% enrichment on 235 U), first mixed core, compiled from 16 IRT-3M fuel assemblies and 4 IRT-4M type fuel assemblies with low enriched fuel (19,7% enrichment on 235 U) and the core fully formed from low enriched fuel are carried out

  3. Repairing method for reactor primary system pipeline

    International Nuclear Information System (INIS)

    Hosokawa, Hideyuki; Uetake, Naoto; Hara, Teruo.

    1997-01-01

    Pipelines after decontamination of radioactive nuclides deposited on the pipelines in a nuclear power plant during operation or pipelines to replace pipelines deposited with radioactive nuclide are connected to each system of the nuclear power plant. They are heated in a gas phase containing oxygen to form an oxide film on the surface of the pipelines. The thickness of the oxide film formed in the gas phase is 1nm or greater, preferably 100nm. The concentration of oxygen in the gas phase containing oxygen must be 0.1% or greater. The heating is conducted by circulating a heated gas to the inside of the pipelines or disposing a movable heater such as a high frequency induction heater inside of the pipelines to form the oxide film. Then, redeposition of radioactive nuclide can be suppressed and since the oxide film is formed in the gas phase, a large scaled facilities are not necessary, thereby enabling to repair pipelines of reactor primary system at low cost. (N.H.)

  4. Protection of WWER type primary loops against extreme effects

    International Nuclear Information System (INIS)

    Podrouzek, J.; Rejent, B.

    1985-01-01

    Dynamic analyses of the WWER-440 primary loops for the Mochovce nuclear power plant showed that the unprotected primary loop is very soft with a first eigenfrequency of 0.38 Hz. Protection with amortisseurs and viscous shock absorbers was compared and the viscous shock absorber in all cases proved to be more suitable. GERB viscous absorbers will be installed at the Mochovce nuclear power plant. First calculations of the dynamic resistance of the WWER-1000 primary loops for the Temelin nuclear power plant to extreme events were also made. It was shown that the unprotected primary loop is rather soft with a first eigenfrequency of 0.9 Hz, or 0.6 Hz at the pressurizer branch. It will therefore be necessary to protect the primary loops with viscous shock absorbers. (Z.M.)

  5. Predicting wear of hydrotransport pipelines in oil sand slurries

    Energy Technology Data Exchange (ETDEWEB)

    Been, J.; Lu, B.; Wolodko, J. [Alberta Research Council, Edmonton, AB (Canada); Kiel, D. [Coanda Research and Development Corp., Burnaby, BC (Canada)

    2008-07-01

    An overview of erosion and corrosion methods and techniques was presented. Wear to pipelines is influenced by slurry flow and chemistry; solids loading; and electrochemical interactions. While several experimental techniques have been developed to rank the performance of different pipeline materials, experiments do not currently provide accurate quantitative prediction of pipeline wear in the field. Rotating cylinder electrodes (RCE) and jet impingement methods are used to study the effect of flow velocity on corrosion rate. Slurry pot erosion-corrosion testers are used to rank materials for use in more dilute, less turbulent slurries. Coriolois slurry erosion testers are used to rank the erosion resistance of different pipeline materials. A pilot-scale flow loop is now being constructed by the Alberta Research Council (ARC) in order to replicate wet erosion phenomena in oil sands applications. The flow loop will be used to simulate the field conditions of oil sands pipelines and develop predictive wear data and models. Coulombic shear stress and characteristic wall velocities have been determined using a 2-layer model designed to represent flow as 2 distinct layers. To date, the flow loop pilot study has demonstrated that wear rates in smaller diameter flow loops are not significantly different than larger diameter field installations. Preliminary calculations have demonstrated that the flow loop can be used to accurately simulate the hydrodynamics and wear typically experienced in field slurry flows. 67 refs., 2 tabs., 7 figs.

  6. Evaluation of fatigue crack growth in the primary circuit pipeline of a WWER 440/213c type nuclear power plant

    International Nuclear Information System (INIS)

    Samohyl, P.

    1993-07-01

    The fatigue damage of the primary circuit of WWER-440/213c reactors was evaluated proceeding from actual and design operating data of units 3 and 4 of the Bohunice V-2 nuclear power plant. A complex computation model was set up, encompassing the main circulation pipeline, pressurizer pipeline, emergency core aftercooling system pipeline, steam pipeline, and feedwater pipeline. The standardized STATIC code was applied to the stress analysis, and the FATLBB code was used to determine the crack increment for all operating states and primary circuit sections. The probability of fatigue failure of the pipelines was found to be low. (J.B.). 55 tabs., 3 figs., 9 refs

  7. Digitally assisted pipeline ADCs theory and implementation

    CERN Document Server

    Murmann, Boris

    2007-01-01

    List of Figures. List of Tables. Acknowledgements. Preface. 1: Introduction. 1. Motivation. 2. Overview. 3. Chapter Organization. 2: Performance Trends. 1. Introduction. 2. Digital Performance Trends. 3. ADC Performance Trends. 3: Scaling Analysis. 1. Introduction. 2. Basic Device Scaling from a Digital Perspective. 3. Technology Metrics for Analog Circuits. 4. Scaling Impact on Matching-Limited Circuits. 5. Scaling Impact on Noise-Limited Circuits. 4: Improving Analog Circuit Efficiency. 1. Introduction. 2. Analog Circuit Challenges. 3. The Cost of Feedback. 4. Two-Stage Feedback Amplifier vs. Open-Loop Gain Stage. 5. Discussion. 5: Open-Loop Pipelined ADCs. 1. A Brief Review of Pipelined ADCs. 2. Conventional Stage Implementation. 3. Open-Loop Pipeline Stages. 4. Alternative Transconductor Implementations. 6: Digital Nonlinearity Correction. 1. Overview. 2. Error Model and Digital Correction. 3. Alternative Error Models. 7: Statistics-Based Parameter Estimation. 1. Introduction. 2. Modulation Approach. 3. R...

  8. Seismic proving test of BWR primary loop recirculation system

    International Nuclear Information System (INIS)

    Sato, H.; Shigeta, M.; Karasawa, Y.

    1987-01-01

    The seismic proving test of BWR Primary Loop Recirculation system is the second test to use the large-scale, high-performance vibration table of Tadotsu Engineering Laboratory. The purpose of this test is to prove the seismic reliability of the primary loop recirculation system (PLR), one of the most important safety components in the BWR nuclear plants, and also to confirm the adequacy of seismic analysis method used in the current seismic design. To achieve the purpose, the test was conducted under conditions and scale as near as possible to actual systems. The strength proving test was carried out with the test model mounted on the vibration table in consideration of basic design earthquake ground motions and other conditions to confirm the soundness of structure and the strength against earthquakes. Detailed analysis and analytic evaluation of the data obtained from the test was conducted to confirm the adequacy of the seismic analysis method and earthquake response analysis method used in the current seismic design. Then, on the basis of the results obtained, the seismic safety and reliability of BWR primary loop recirculation of the actual plants was fully evaluated

  9. Water hammer characteristics of integral pressurized water reactor primary loop

    International Nuclear Information System (INIS)

    Zuo, Qiaolin; Qiu, Suizheng; Lu, Wei; Tian, Wenxi; Su, Guanghui; Xiao, Zejun

    2013-01-01

    Highlights: • Water hammer models developed for IPWR primary loop using MOC. • Good agreement between the developed code and the experiment. • The good agreement between WAHAP and Flowmaster can validate the equations in WAHAP. • The primary loop of IPWR suffers from slight water hammer impact. -- Abstract: The present work discussed the single-phase water hammer phenomenon, which was caused by the four-pump-alternate startup in an integral pressurized water reactor (IPWR). A new code named water hammer program (WAHAP) was developed independently based on the method of characteristic to simulate hydraulic transients in the primary system of IPWR and its components such as reactor core, once-through steam generators (OTSG), the main coolant pumps and so on. Experimental validation for the correctness of the equations and models in WAHAP was carried out and the models fit the experimental data well. Some important variables were monitored including transient volume flow rates, opening angle of valve disc and pressure drop in valves. The water hammer commercial software Flowmaster V7 was also employed to compare with WAHAP and the good agreement can validate the equations in WAHAP. The transient results indicated that the primary loop of IPWR suffers from slight water hammer impact under pump switching conditions

  10. Water hammer characteristics of integral pressurized water reactor primary loop

    Energy Technology Data Exchange (ETDEWEB)

    Zuo, Qiaolin [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shanxi 710049 (China); Qiu, Suizheng, E-mail: szqiu@mail.xjtu.edu.cn [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shanxi 710049 (China); Lu, Wei; Tian, Wenxi; Su, Guanghui [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, Shanxi 710049 (China); Xiao, Zejun [Nuclear Power Institute of China, Chengdu, Sichuan 610041 (China)

    2013-08-15

    Highlights: • Water hammer models developed for IPWR primary loop using MOC. • Good agreement between the developed code and the experiment. • The good agreement between WAHAP and Flowmaster can validate the equations in WAHAP. • The primary loop of IPWR suffers from slight water hammer impact. -- Abstract: The present work discussed the single-phase water hammer phenomenon, which was caused by the four-pump-alternate startup in an integral pressurized water reactor (IPWR). A new code named water hammer program (WAHAP) was developed independently based on the method of characteristic to simulate hydraulic transients in the primary system of IPWR and its components such as reactor core, once-through steam generators (OTSG), the main coolant pumps and so on. Experimental validation for the correctness of the equations and models in WAHAP was carried out and the models fit the experimental data well. Some important variables were monitored including transient volume flow rates, opening angle of valve disc and pressure drop in valves. The water hammer commercial software Flowmaster V7 was also employed to compare with WAHAP and the good agreement can validate the equations in WAHAP. The transient results indicated that the primary loop of IPWR suffers from slight water hammer impact under pump switching conditions.

  11. Analysis of the CAREM reactor's primary loop stability

    International Nuclear Information System (INIS)

    Mazzi, R.

    1990-01-01

    The results obtained to determine the stability conditions of the CAREM reactor's primary loop, using techniques based on the frequential response to the system, are presented. The stability margins were evaluated employing different alternatives; all of them predict a behaviour acceptable to the nominal working conditions. (Author) [es

  12. Applications and Prospects of Modularization Technology in HTR Project Starting from Primary Loop Cavity Construction

    International Nuclear Information System (INIS)

    Yang Guokang; Chen Jing; Huang Wen; Lin Lizhi; Sun Yunlun; Chen Yan; Mao Jiaxin; Wang Yougang; Wang Jinwen; Lin Mingfeng; Yang Mingshan

    2014-01-01

    Primary loop cavity is one of the key areas and major difficulties in HTR-PM project construction. In order to shorten the construction schedule and improve the construction quality, researches on modular design and construction of primary loop cavity has been carried out and the results have been applied in HTR-PM project construction, and got significant application benefit. This paper summarizes the modularization technology application research and project implementation results of primary loop cavity, and analyzes the application and prospects of modularization technology in the HTR project construction. (author)

  13. Magnetic and microstructural investigation of pipeline steel

    International Nuclear Information System (INIS)

    Groessinger, R.; Mehmood, N.; Hiram Espina, J.; Keplinger, F.

    2008-01-01

    Full text: Magnetic studies (as e.g. hysteresis loop, minor loops initial susceptibility, Barkhausen noise etc.) on pipeline tubes can be used to detect local errors, scratches, stress centres etc. There exist up to now several papers characterising the stress-state of such steels however not yet a systematic investigation correlating the microstructure with intrinsic magnetic properties of the material. Within this paper three different types of steel, which are generally used for pipelines, will be investigated with respect to their microstructure, their magnetic properties (hysteresis) and their magnetostriction. In order to investigate the effect of texture, one sample was cut parallel to the tube direction (longitudinal), one was cut perpendicular to the tube direction (transversal). The microstructure was investigated using a light microscope. The topological structure was investigated using an AFM, the domain structure was observed by a MFM. From all steels frame shaped samples were made which were used to measure the hysteresis loop in a magnetically closed arrangement. (author)

  14. High temperature pipeline design

    Energy Technology Data Exchange (ETDEWEB)

    Greenslade, J.G. [Colt Engineering, Calgary, AB (Canada). Pipelines Dept.; Nixon, J.F. [Nixon Geotech Ltd., Calgary, AB (Canada); Dyck, D.W. [Stress Tech Engineering Inc., Calgary, AB (Canada)

    2004-07-01

    It is impractical to transport bitumen and heavy oil by pipelines at ambient temperature unless diluents are added to reduce the viscosity. A diluted bitumen pipeline is commonly referred to as a dilbit pipeline. The diluent routinely used is natural gas condensate. Since natural gas condensate is limited in supply, it must be recovered and reused at high cost. This paper presented an alternative to the use of diluent to reduce the viscosity of heavy oil or bitumen. The following two basic design issues for a hot bitumen (hotbit) pipeline were presented: (1) modelling the restart problem, and, (2) establishing the maximum practical operating temperature. The transient behaviour during restart of a high temperature pipeline carrying viscous fluids was modelled using the concept of flow capacity. Although the design conditions were hypothetical, they could be encountered in the Athabasca oilsands. It was shown that environmental disturbances occur when the fluid is cooled during shut down because the ground temperature near the pipeline rises. This can change growing conditions, even near deeply buried insulated pipelines. Axial thermal loads also constrain the design and operation of a buried pipeline as higher operating temperatures are considered. As such, strain based design provides the opportunity to design for higher operating temperature than allowable stress based design methods. Expansion loops can partially relieve the thermal stress at a given temperature. As the design temperature increase, there is a point at which above grade pipelines become attractive options, although the materials and welding procedures must be suitable for low temperature service. 3 refs., 1 tab., 10 figs.

  15. Primary loop simulation of the SP-100 space nuclear reactor

    International Nuclear Information System (INIS)

    Borges, Eduardo M.; Braz Filho, Francisco A.; Guimaraes, Lamartine N.F.

    2011-01-01

    Between 1983 and 1992 the SP-100 space nuclear reactor development project for electric power generation in a range of 100 to 1000 kWh was conducted in the USA. Several configurations were studied to satisfy different mission objectives and power systems. In this reactor the heat is generated in a compact core and refrigerated by liquid lithium, the primary loops flow are controlled by thermoelectric electromagnetic pumps (EMTE), and thermoelectric converters produce direct current energy. To define the system operation point for an operating nominal power, it is necessary the simulation of the thermal-hydraulic components of the space nuclear reactor. In this paper the BEMTE-3 computer code is used to EMTE pump design performance evaluation to a thermalhydraulic primary loop configuration, and comparison of the system operation points of SP-100 reactor to two thermal powers, with satisfactory results. (author)

  16. First domestic primary loop recircuration pump for boiling water reactor

    International Nuclear Information System (INIS)

    Fukuda, Minoru; Taka, Shusei; Kato, Hiroyuki

    1981-01-01

    Two primary loop recirculation (PLR) pumps for the second unit of the Fukushima No. 2 Nuclear Power Station of the Tokyo Electric Power Co., Inc., have been manufactured by Ebara Corporation. They are the first domestically produced pumps for commercial power plants and were manufactured under license from Byron Jackson Pump Division of Borg Warner Corporation. This article describes the special features of pump design and stress analysis, and the results of the 700 hours of factory loop tests, which are all essential for the PLR pump. (author)

  17. Analysis on the heat balance between CEFR and the primary loop system

    International Nuclear Information System (INIS)

    Liu Shangbo; Yang Hongyi; Li Jing; Wang Xiongying

    2013-01-01

    The heat balance ability of reactor is very important to design and operation. Special heat balance analysis and calculation software shall be available. This article analyzes and calculates in details the heat source and cooling power of the main cooling system of the primary loop in China Experimental Faster Reactor (CEFR), and develops a calculation code. By using the steady state heat balance data of 26.5% Pn and 40% Pn in CEFR during power start-up, the heat balance ability of the primary loop is verified. The results show that the calculation model is reliable, and can provide technical support to building heat balance in CEFR operation. (authors)

  18. One-Loop Operation of Primary Heat Transport System in MONJU During Heat Transport System Modifications

    International Nuclear Information System (INIS)

    Goto, T.; Tsushima, H.; Sakurai, N.; Jo, T.

    2006-01-01

    MONJU is a prototype fast breeder reactor (FBR). Modification work commenced in March 2005. Since June 2004, MONJU has changed to one-loop operation of the primary heat transport system (PHTS) with all of the secondary heat transport systems (SHTS) drained of sodium. The purposes of this change are to shorten the modification period and to reduce the cost incurred for circuit trace heating electrical consumption. Before changing condition, the following issues were investigated to show that this mode of operation was possible. The heat loss from the reactor vessel and the single primary loop must exceed the decay heat by an acceptable margin but the capacity of pre-heaters to keep the sodium within the primary vessel at about 200 deg. C must be maintained. With regard to the heat loss and the decay heat, the estimated heat loss in the primary system was in the range of 90-170 kW in one-loop operation, and the calculated decay heat was 21.2 kW. Although the heat input of the primary pump was considered, it was clear that circuit heat loss greatly exceeded the decay heat. As for pre-heaters, effective capacity was less than the heat loss. Therefore, the temperature of the reactor vessel room was raised to reduce the heat loss. One-loop operation of the PHTS was able to be executed by means of these measures. The cost of electrical consumption in the power plant has been reduced by one-loop operation of the PHTS and the modification period was shortened. (authors)

  19. Response of the primary piping loop to an HCDA

    International Nuclear Information System (INIS)

    Chang, Y.W.; Moneim, M.T.A.; Wang, C.Y.; Gvildys, J.

    1975-01-01

    The paper describes a method for analyzing the response of the primary piping loop that consists of straight pipes, elbows, and other components connected in series and subject to hypothetical core disruptive accident (HCDA) loads at both ends of the loop. The complete hydrodynamic equations in two-dimensions, that include both the nonlinear convective and viscous dissipation terms are used for the fluid dynamics together with the implicit ICE technique. The external walls of the pipes and components are treated as thin shells in which the analysis accounts for the membrane and bending strength of the wall, elastic-plastic material behavior, as well as large deformation under the effect of transient loading conditions. In the straight pipes, the flow is assumed to be axisymmetric; in the elbow regions, the two dimensions considered are the r and theta directions. The flow in the other components is also assumed to be axisymmetric; the components are modeled as a circular cylinder, in which the radius of the cylinder can be varied to conform with the outside shape of the component and the flow area inside can be changed independently from the outside shape. However, they must remain axially symmetric. The method is applied to a piping loop which consists of six elastic-plastic pipes and five rigid elbows connected in series and subjected to pressure pulses at both ends of the loop

  20. PWR type reactor equipped with a primary circuit loop water level gauge

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro.

    1990-01-01

    The time of lowering a water level to less than the position of high temperature side pipeway nozzle has been rather delayed because of the swelling of mixed water level due to heat generation of the reactor core. Further, there has been a certain restriction for the installation, maintenance and adjustment of a water level gauge since it is at a position under high radiation exposure. Then, a differential pressure type water level gauge with temperature compensation is disposed at a portion below a water level gauge of a pressurizer and between the steam generator exit plenum and the lower end of the loop seal. Further, a similar water level system is disposed to all of the loops of the primary circulation circuits. In a case that the amount of water contained in a reactor container should decreased upon occurrence of loss of coolant accidents caused by small rupture and stoppage of primary circuit pumps, lowering of the water level preceding to the lowering of the water level in the reactor core is detected to ensure the amount of water. Since they are disposed to all of the loops and ensure the excess margin, reliability for the detection of the amount of contained water can be improved by averaging time for the data of the water level and averaging the entire systems, even when there are vibrations in the fluid or pressure in the primary circuit. (N.H.)

  1. LOOP: engineering marvel, economic calamity

    Energy Technology Data Exchange (ETDEWEB)

    Brossard, E B

    1985-01-01

    The Louisiana Offshore Oil Port (LOOP) is the first superport built in the Lower 48. The United States was the only major oil-importing country that did not have a superport, and therefore, could not offload very large crude carriers (VLCCs). Unfortunately, a number of factors changed after it was decided to build LOOP, and these, plus the onerous provisions of the Deepwater Ports Act of 1974, which authorized superports, prevented LOOP from operating economically. LOOP's facilities consist of an offshore platform complex with three single-point-mooring (SPM) system buoys, 19 miles offshore in 110 feet of water, as well as a 32-million-barrel storage terminal 31 miles inland at Clovelly Salt Dome, and connecting pipelines offshore and onshore. By the time LOOP was started-up in May 1981, demand for oil had declined, because of rises in the price of oil, and the source of US oil imports had shifted back to the western hemisphere, away from the eastern hemisphere, closer to the US. The refinery mix in the US also changed, because of up-grading of a number of big refineries, which further reduced demand and made heavier crudes from countries like Mexico and Venezuela more economical. Because of reduced oil imports and shorter hauls, oil shippers started using or continued to use smaller tankers. Smaller tankers are not economical for LOOP, nor do they need LOOP. The start-up of the Trans-Alaska Pipeline System (TAPS) in mid-1977 backed out 1.5 million bd/sup -1/ of foreign imports. TAPS' capacity coincides with LOOP's offloading capacity of 1.4 million bd/sup -1/. US decontrol of domestic crude in 1981 and increased drilling, plus general energy conservation further reduced US oil imports. US consumption declined to 15.1 million bd/sup -1/ in 1983, from 18.8 million bd/sup -1/ in 1978. This award-winning superport needed federal decontrol and increased oil imports along with more VLCCs, in order to operate economically.

  2. Efficiency of the pre-heater against flow rate on primary the beta test loop

    International Nuclear Information System (INIS)

    Edy Sumarno; Kiswanta; Bambang Heru; Ainur R; Joko P

    2013-01-01

    Calculation of efficiency of the pre-heater has been carried out against the flow rate on primary the BETA Test Loop. BETA test loop (UUB) is a facilities of experiments to study the thermal hydraulic phenomenon, especially for thermal hydraulic post-LOCA (Lost of Coolant Accident). Sequences removal on the BETA Test Loop contained a pre-heater that serves as a getter heat from the primary side to the secondary side, determination of efficiency is to compare the incoming heat energy with the energy taken out by a secondary fluid. Characterization is intended to determine the performance of a pre-heater, then used as tool for analysis, and as a reference design experiments. Calculation of efficiency methods performed by operating the pre-heater with fluid flow rate variation on the primary side. Calculation of efficiency on the results obtained that the efficiency change with every change of flow rate, the flow rate is 71.26% on 163.50 ml/s and 60.65% on 850.90 ml/s. Efficiency value can be even greater if the pre-heater tank is wrapped with thermal insulation so there is no heat leakage. (author)

  3. Belgian experience in applying the open-quotes leak-before-breakclose quotes concept to the primary loop piping

    International Nuclear Information System (INIS)

    Gerard, R.; Malekian, C.; Meessen, O.

    1997-01-01

    The Leak Before Break (LBB) concept allows to eliminate from the design basis the double-ended guillotine break of the primary loop piping, provided it can be demonstrated by a fracture mechanics analysis that a through-wall flaw, of a size giving rise to a leakage still well detectable by the plant leak detection systems, remains stable even under accident conditions (including the Safe Shutdown Earthquake (SSE)). This concept was successfully applied to the primary loop piping of several Belgian Pressurized Water Reactor (PWR) units, operated by the Utility Electrabel. One of the main benefits is to permit justification of supports in the primary loop and justification of the integrity of the reactor pressure vessel and internals in case of a Loss Of Coolant Accident (LOCA) in stretch-out conditions. For two of the Belgian PWR units, the LBB approach also made it possible to reduce the number of large hydraulic snubbers installed on the primary coolant pumps. Last but not least, the LBB concept also facilitates the steam generator replacement operations, by eliminating the need for some pipe whip restraints located close to the steam generator. In addition to the U.S. regulatory requirements, the Belgian safety authorities impose additional requirements which are described in details in a separate paper. An novel aspect of the studies performed in Belgium is the way in which residual loads in the primary loop are taken into account. Such loads may result from displacements imposed to close the primary loop in a steam generator replacement operation, especially when it is performed using the open-quote two cutsclose quotes technique. The influence of such residual loads on the LBB margins is discussed in details and typical results are presented

  4. Study on the Break Accidents of the HTR-PM Primary Loop

    International Nuclear Information System (INIS)

    Lang Minggang; Sun Ximing; Zheng Yanhua

    2014-01-01

    In thermal hydraulics design and safety analysis of the HTR-PM, the THERMIX code was used to study the behavior of the helium in the primary system. Once the helium leaks from the primary loop through a break or a relief valve, it is hard to simulate the states of the leakage room with THERMIX. In this paper, the latest version of RELAP5/MOD4, was used to simulate the behavior of the helium released to the containment rooms. A RELAP5/MOD4 model of the HTR-PM, including the core, the primary system, the secondary loop and the containment, were developed and evaluated in this paper. Based on the model, this paper studied the accidents consequences of a large break in the pressure relief room and a small break in the instrument room of the HTR-PM reactor building. The simulating results illustrate that the temperature in the pressure relief room was no more than 200℃ after a un-isolating large break, and the temperature in the instrument room is less than 130 ℃ after a small un-isolating break. The analysis shows that the scram function and the ability to monitor the reactor temperature and pressure after accidents would not be affected by the break. (author)

  5. Dose rates modeling of pressurized water reactor primary loop components with SCALE6.0

    International Nuclear Information System (INIS)

    Matijević, Mario; Pevec, Dubravko; Trontl, Krešimir

    2015-01-01

    Highlights: • Shielding analysis of the typical PWR primary loop components was performed. • FW-CADIS methodology was thoroughly investigated using SCALE6.0 code package. • Versatile ability of SCALE6.0/FW-CADIS for deep penetration models was proved. • The adjoint source with focus on specific material can improve MC modeling. - Abstract: The SCALE6.0 simulation model of a typical PWR primary loop components for effective dose rates calculation based on hybrid deterministic–stochastic methodology was created. The criticality sequence CSAS6/KENO-VI of the SCALE6.0 code package, which includes KENO-VI Monte Carlo code, was used for criticality calculations, while neutron and gamma dose rates distributions were determined by MAVRIC/Monaco shielding sequence. A detailed model of a combinatorial geometry, materials and characteristics of a generic two loop PWR facility is based on best available input data. The sources of ionizing radiation in PWR primary loop components included neutrons and photons originating from critical core and photons from activated coolant in two primary loops. Detailed calculations of the reactor pressure vessel and the upper reactor head have been performed. The efficiency of particle transport for obtaining global Monte Carlo dose rates was further examined and quantified with a flexible adjoint source positioning in phase-space. It was demonstrated that generation of an accurate importance map (VR parameters) is a paramount step which enabled obtaining Monaco dose rates with fairly uniform uncertainties. Computer memory consumption by the S N part of hybrid methodology represents main obstacle when using meshes with large number of cells together with high S N /P N parameters. Detailed voxelization (homogenization) process in Denovo together with high S N /P N parameters is essential for precise VR parameters generation which will result in optimized MC distributions. Shielding calculations were also performed for the reduced PWR

  6. Development of water chemistry diagnosis system for BWR primary loop

    International Nuclear Information System (INIS)

    Nagase, Makoto; Asakura, Yamato; Sakagami, Masaharu; Uchida, Shunsuke; Ohsumi, Katsumi.

    1988-01-01

    The prototype of a water chemistry diagnosis system for BWR primary loop has been developed. Its purposes are improvement of water chemistry control and reduction of the work burden on plant chemistry personnel. It has three main features as follows. (1) Intensifying the observation of water chemistry conditions by variable sampling intervals based on the on-line measured data. (2) Early detection of water chemistry data trends using a second order regression curve which is calculated from the measured data, and then searching the cause of anomaly if anything (3) Diagnosis of Fe concentration in feedwater using model simulations, in order to lower the radiation level in the primary system. (author)

  7. Stress and thermal expansion numerical analysis of subsea buried pipelines; Analise numerica de tensoes e expansao termica de dutos submarinos enterrados

    Energy Technology Data Exchange (ETDEWEB)

    Souto, Marcio de S.; Vaz, Murilo A. [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia; Solano, Rafael F. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The design of Capixaba North Terminal pipelines (TNC) became very complex, once the pipelines are exposed to elevated temperature variations. As the pipelines are buried, the interaction with the seabed can become critical with the thermal expansion development, since an axial compressive force arise, reaching critical values and then leading the pipeline to the thermo mechanical instability phenomenon. To minimize these effects, the pipeline will cross the shore approach through a horizontal directional drilling, and expansion loops and intermediate tie-ins took place on his route in order to permit pipeline displacements, working thermally. The objective of this present work is to develop a numerical model, able to analyze the entire pipeline stress, strain and displacements, considering different kinds of soil along of his route. The influence of expansion loops is evaluated and a comparative analysis in order to discover the minimum curvature radius at the directional drilling region is carried out. This study defines a methodology based on the developed numerical model which will be extended to future applications in subsea buried pipeline design. (author)

  8. Experimental Study on the Natural Circulation Characteristics in the Primary Loop of the SMART Reactor by using the VISTA Facility

    International Nuclear Information System (INIS)

    Park, Hyun-Sik; Choi, Ki-Yong; Cho, Seok; Yi, Sung-Jae; Park, Choon-Kyung; Chung, Moon-Ki

    2007-01-01

    The SMART uses a two-phase natural circulation in the PRHRS loop to remove the heat from the steam generators to the PRHRS heat exchangers, while a single phase natural circulation occurs in the primary loop to transfer the decay heat from the core to the steam generator. Natural circulation operation with a power range of 20 ∼ 25% was considered for SMART and nowadays the possibility of increasing the power level during the natural circulation operation is being investigated. Previously Park et al. performed several experiments by using the VISTA facility on the thermal-hydraulic characteristics of the PRHRS for the SMART-P, which includes a single-phase natural circulation in the primary loop. From the analysis with the TASS-SMR code it was shown that the reference temperature for the primary steam generator inlet temperature should be increased in order to compensate for the decreased core flow. To investigate the possibility of an increase of the power and reference temperature, it is necessary to get experimental data to characterize the natural circulation phenomena in the primary loop of the SMART. In this paper, the characteristics of natural circulation in the primary loop are experimentally investigated during various operational conditions by using the VISTA facility

  9. Automatic parallelization of while-Loops using speculative execution

    International Nuclear Information System (INIS)

    Collard, J.F.

    1995-01-01

    Automatic parallelization of imperative sequential programs has focused on nests of for-loops. The most recent of them consist in finding an affine mapping with respect to the loop indices to simultaneously capture the temporal and spatial properties of the parallelized program. Such a mapping is usually called a open-quotes space-time transformation.close quotes This work describes an extension of these techniques to while-loops using speculative execution. We show that space-time transformations are a good framework for summing up previous restructuration techniques of while-loop, such as pipelining. Moreover, we show that these transformations can be derived and applied automatically

  10. Belgian experience in applying the {open_quotes}leak-before-break{close_quotes} concept to the primary loop piping

    Energy Technology Data Exchange (ETDEWEB)

    Gerard, R.; Malekian, C.; Meessen, O. [Tractebel Energy Engineering, Brussels (Belgium)

    1997-04-01

    The Leak Before Break (LBB) concept allows to eliminate from the design basis the double-ended guillotine break of the primary loop piping, provided it can be demonstrated by a fracture mechanics analysis that a through-wall flaw, of a size giving rise to a leakage still well detectable by the plant leak detection systems, remains stable even under accident conditions (including the Safe Shutdown Earthquake (SSE)). This concept was successfully applied to the primary loop piping of several Belgian Pressurized Water Reactor (PWR) units, operated by the Utility Electrabel. One of the main benefits is to permit justification of supports in the primary loop and justification of the integrity of the reactor pressure vessel and internals in case of a Loss Of Coolant Accident (LOCA) in stretch-out conditions. For two of the Belgian PWR units, the LBB approach also made it possible to reduce the number of large hydraulic snubbers installed on the primary coolant pumps. Last but not least, the LBB concept also facilitates the steam generator replacement operations, by eliminating the need for some pipe whip restraints located close to the steam generator. In addition to the U.S. regulatory requirements, the Belgian safety authorities impose additional requirements which are described in details in a separate paper. An novel aspect of the studies performed in Belgium is the way in which residual loads in the primary loop are taken into account. Such loads may result from displacements imposed to close the primary loop in a steam generator replacement operation, especially when it is performed using the {open_quote}two cuts{close_quotes} technique. The influence of such residual loads on the LBB margins is discussed in details and typical results are presented.

  11. Thermal expansion absorbing structure for pipeline

    International Nuclear Information System (INIS)

    Nagata, Takashi; Yamashita, Takuya.

    1995-01-01

    A thermal expansion absorbing structure for a pipeline is disposed to the end of pipelines to form a U-shaped cross section connecting a semi-circular torus shell and a short double-walled cylindrical tube. The U-shaped longitudinal cross-section is deformed in accordance with the shrinking deformation of the pipeline and absorbs thermal expansion. Namely, since the central lines of the outer and inner tubes of the double-walled cylindrical tube deform so as to incline, when the pipeline is deformed by thermal expansion, thermal expansion can be absorbed by a simple configuration thereby enabling to contribute to ensure the safety. Then, the entire length of the pipeline can greatly be shortened by applying it to the pipeline disposed in a high temperature state compared with a method of laying around a pipeline using only elbows, which has been conducted so far. Especially, when it is applied to a pipeline for an FBR-type reactor, the cost for the construction of a facility of a primary systems can greater be reduced. In addition, it can be applied to a pipeline for usual chemical plants and any other structures requiring absorption of deformation. (N.H.)

  12. Method of cleaning pipeline in control rod drive

    International Nuclear Information System (INIS)

    Baba, Mikiya.

    1993-01-01

    A step of filtering cleaning water by a provisional filter unit and a step of returning filtered cleaning water to a provisional tank are disposed. That is, purified water is stored in the provisional tank and it is sucked by a driving pump under pressure by way of a suction filter into the pipelines in a control rod drive system to clean them. Purified water after the cleaning is filtered by the provisional filter unit and returned to the provisional tank by way of provisional pipelines to form a closed loop. A great amount of purified water to be used is no more necessary by thus changing the water passing cleaning method to the recycling cleaning method, which moderate influences on other steps using purified water and ensure a cleaning step for pipelines in a CRD system, in addition, save the steps for plant construction greatly. (N.H.)

  13. Development of new design mechanical seal tester for Primary Loop Recirculation Pump (PLR Pump)

    International Nuclear Information System (INIS)

    Fukushima, Naoki; Koshiba, Koremutsu

    1995-01-01

    The mechanical seal for a Primary Loop Recirculation Pump (PLR Pump) is an important part of a BWR plant. This study describes a new mechanical seal tester developed to certify mechanical seal performance before installation in a PLR Pump on site. (author)

  14. Alliance Pipeline - The new kid on the block

    International Nuclear Information System (INIS)

    Edgeworth, A.

    1998-01-01

    Alliance Pipeline has taken on as its primary role to improve the competitive position of the Western Canadian Sedimentary Basin (WCSB), to increase market access for WCSB production, to provide a link for North American gas pricing, and to increase the total gas supply available across North America to serve current and future requirements. A summary of the company's partnership structure and construction program is presented. Also discussed were issues facing Canadian transporters and producers such as: pricing dynamics, gas supplies, regulatory change, competition, convergence, pipeline integrity, land issues, environmental issues, aboriginal issues, cost structures and taxes. The potential impact of the Alliance Pipeline coming on-stream in October 2000 on existing pipelines, possible future pipelines and on the existing supply scene is also assessed. tabs., figs

  15. Reactor recirculation pump test loop

    International Nuclear Information System (INIS)

    Taka, Shusei; Kato, Hiroyuki

    1979-01-01

    A test loop for a reactor primary loop recirculation pumps (PLR pumps) has been constructed at Ebara's Haneda Plant in preparation for production of PLR pumps under license from Byron Jackson Pump Division of Borg-Warner Corporation. This loop can simulate operating conditions for test PLR pumps with 130 per cent of the capacity of pumps for a 1100 MWe BWR plant. A main loop, primary cooling system, water demineralizer, secondary cooling system, instrumentation and control equipment and an electric power supply system make up the test loop. This article describes the test loop itself and test results of two PLR pumps for Fukushima No. 2 N.P.S. Unit 1 and one main circulation pump for HAZ Demonstration Test Facility. (author)

  16. PLUGGING AND UNPLUGGING OF WASTE TRANSFER PIPELINES

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1999-01-01

    This project, which began in FY97, involves both the flow loop research on plugging and unplugging of waste transfer pipelines, and the large-scale industrial equipment test of plugging locating and unplugging technologies. In FY98, the related work was performed under the project name ''Mixing, Settling, and Pipe Unplugging of Waste Transfer Lines.'' The mixing, settling, and pipeline plugging and unplugging are critical to the design and maintenance of a waste transfer pipeline system, especially for the High-Level Waste (HLW) pipeline transfer. The major objective of this work is to recreate pipeline plugging conditions for equipment testing of plug locating and removal and to provide systematic operating data for modification of equipment design and enhancement of performance of waste transfer lines used at DOE sites. As the waste tank clean-out and decommissioning program becomes active at the DOE sites, there is an increasing potential that the waste slurry transfer lines will become plugged and unable to transport waste slurry from one tank to another or from the mixing tank to processing facilities. Transfer systems may potentially become plugged if the solids concentration of the material being transferred increases beyond the capability of the prime mover or if upstream mixing is inadequately performed. Plugging can occur due to the solids' settling in either the mixing tank, the pumping system, or the transfer lines. In order to enhance and optimize the slurry's removal and transfer, refined and reliable data on the mixing, sampling, and pipe unplugging systems must be obtained based on both laboratory-scale and simulated in-situ operating conditions

  17. Essays on the economics of natural gas pipelines

    Science.gov (United States)

    Oliver, Matthew E.

    The natural gas pipeline transportation industry is comprised of a primary market and a secondary market. In the primary market, pipelines sell 'firm' transport capacity contracts to gas traders, local distribution companies, and other parties. The (per unit) secondary market value of transport is rarely comparable to the regulated primary market two-part tariff. When and where available capacity in the secondary market is scarce, its value can far exceed the primary market tariffs paid by firm contract holders, generating scarcity rents. The following essays demonstrate that this phenomenon has predictable effects on natural gas spot prices, firm capacity reservations, the pipeline's capacity construction and expansion decisions, and the economic welfare of producers and consumers at the market hubs connected by the pipeline. Chapter 1 provides a theoretical framework for understanding how pipeline congestion affects natural gas spot prices within the context of the current regulatory environment, and empirically quantifies this effect over a specific regional pipeline network. As available pipeline capacity over a given route connecting two hubs becomes scarce, the spot prices for gas at the hubs are driven apart---a phenomenon indicative of some market friction that inhibits the ability of spot price arbitrage to fully integrate the two prices, undermining economic efficiency. The theoretical component of Chapter 1 illuminates a potential source of this friction: the deregulated structure of the secondary market for gas transportation services. To support and quantify the predictions of the theoretical model, the empirical component demonstrates that the effect of congestion on the secondary market value of transport---the key factor in driving apart spot prices---can be quite strong. Coefficient estimates indicate that dramatic increases in transport costs are likely to result from marginal increases in congestion. This result has important implications because

  18. Plugging of drinking water flow into horizontal high diameter pipeline with artificial ice plug

    International Nuclear Information System (INIS)

    Gyongyosi, T.; Valeca, S.; Panaitescu, V. N.; Prisecaru, I.

    2013-01-01

    Local isolation of a pipeline section, placed horizontally into a loop of drinking water supply network, can be made with an ice plug resulting after controlled process inside of pipeline without stopping the consumer supply. The technique is applying in order to perform repairs or items replacement, without closing the drinking water supply network at the same time decreasing the fluid loss resulted after discharge of the affected loop. In facts, the technique is simple one and assumes to apply a special device sized for each case using a freezing liquid agent injected continuously. The paper contains a constructive description of the experimental technological facilities and of the experimental model for ice plugging device used. The test, the first results get and some conclusion are following. The paper is dedicated to the specialists working in the research and technological engineering. (authors)

  19. Thermohydraulics in a high-temperature gas-cooled reactor primary loop during early phases of unrestricted core-heatup accidents

    International Nuclear Information System (INIS)

    Kroeger, P.G.; Colman, J.; Hsu, C.J.

    1983-01-01

    In High Temperature Gas Cooled Reactor (HTGR) siting considerations, the Unrestricted Core Heatup Accidents (UCHA) are considered as accidents of highest consequence, corresponding to core meltdown accidents in light water reactors. Initiation of such accidents can be, for instance, due to station blackout, resulting in scram and loss of all main loop forced circulation, with none of the core auxiliary cooling system loops being started. The result is a slow but continuing core heatup, extending over days. During the initial phases of such UCHA scenarios, the primary loop remains pressurized, with the system pressure slowly increasing until the relief valve setpoint is reached. The major objectives of the work described here were to determine times to depressurization as well as approximate loop component temperatures up to depressurization

  20. Impedance Method for Leak Detection in Zigzag Pipelines

    Science.gov (United States)

    Lay-Ekuakille, A.; Vergallo, P.; Trotta, A.

    2010-01-01

    Transportation of liquids is a primary aspect of human life. The most important infrastructure used accordingly is the pipeline. It serves as an asset for transporting different liquids and strategic goods. The latter are for example: chemical substances, oil, gas and water. Thus, it is necessary to monitor such infrastructures by means of specific tools. Leakage detection methods are used to reveal liquid leaks in pipelines for many applications, namely, waterworks, oil pipelines, industry heat exchangers, etc. The configuration of pipelines is a key issue because it impacts on the effectiveness of the method to be used and, consequently, on the results to be counterchecked. This research illustrated an improvement of the impedance method for zigzag pipeline by carrying out an experimental frequency analysis that has been compared with other methods based on frequency response. Hence, the impedance method is generally used for simple (straight) pipeline configurations because complicated pipelines with many curves introduce difficulties and major uncertainties in the calculation of characteristic impedance and in the statement of boundary conditions. The paper illustrates the case of a water pipeline where the leakage is acquired thanks to pressure transducers.

  1. Pipeline engineering

    CERN Document Server

    Liu, Henry

    2003-01-01

    PART I: PIPE FLOWSINTRODUCTIONDefinition and Scope Brief History of PipelinesExisting Major PipelinesImportance of PipelinesFreight (Solids) Transport by PipelinesTypes of PipelinesComponents of PipelinesAdvantages of PipelinesReferencesSINGLE-PHASE INCOMPRESSIBLE NEWTONIAN FLUIDIntroductionFlow RegimesLocal Mean Velocity and Its Distribution (Velocity Profile)Flow Equations for One-Dimensional AnalysisHydraulic and Energy Grade LinesCavitation in Pipeline SystemsPipe in Series and ParallelInterconnected ReservoirsPipe NetworkUnsteady Flow in PipeSINGLE-PHASE COMPRESSIBLE FLOW IN PIPEFlow Ana

  2. Pemakaian Crown Loop dan Band Loop di Rahang Bawah Anak Usia Enam Tahun (Laporan Kasus

    Directory of Open Access Journals (Sweden)

    Rivi Isabela

    2015-11-01

    Full Text Available The function of space maintainer is to preserve arch length following the premature loss of a primary teeth. Early loss of primary tooth may compromise the eruption of succedaneous teeth if there is a reduction in the arch length. The Band and Crown Loop are used to maintain the loss of primary molar. The report describe a 6 year old girl who has premature loss of second left mandibular primary molar and first right mandibular primary molar treated using crown and band loop space maintainer. The patient still has mastication function from other posterior primary teeth.

  3. Natural gas pipeline technology overview.

    Energy Technology Data Exchange (ETDEWEB)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by

  4. LOOP marine and estuarine monitoring program, 1978-95 : volume 4 : zooplankton and ichthyoplankton.

    Science.gov (United States)

    1998-01-01

    The Louisiana Offshore Oil Port (LOOP) facilities in coastal Louisiana provide the United States with the country's only Superport for off-loading deep draft tankers. The three single-point mooring (SPM) structures connected by pipelines to a platfor...

  5. Medium-term experiences with in-situ gamma-spectrometry of the primary loop transport processes at Paks NPP

    International Nuclear Information System (INIS)

    Raics, P.; Sztaricskai, T.; Szabo, J.; Szegedi, S.

    2001-01-01

    Surface activity of 15 corrosion/erosion and fission products was determined by in-situ gamma-spectrometry for 2-2 locations on the hot and cold legs of each loop, respectively. Gamma-dosimetry in the assay points was performed. Activity profiles of ion exchange columns were analyzed. Combined measurements along the steam generators completed the characterization of the primary circuits. Most of this technique was regularly included into all maintenance periods. Data evaluation was performed for the surface contaminations as well as coolant activities and reactor operation features for years 1985-2001. Trends and tendencies were investigated in the time behavior of the specific activities. Asymmetry in the surface contamination at the primary loop points, cold-leg activity inversion, water chemistry effects, isotope selectivity were observed. Correlations in different parameters have been calculated and analyzed. (R.P.)

  6. Stress analysis of primary pipe rigid support of the in pile loop

    International Nuclear Information System (INIS)

    Hasibuan, Dj.

    1998-01-01

    Base on requirement of the safety analysis report and operation planning preparation on the in pile loop by using the fuel bundle in the test section, the stress analysis of primary pipe support has been done. The analysis was performed for the 3 (three) points of pipe support, which are chosen by random selection, i.e.: GU 2001, GU 2002, and GU 2331. The analysis result showed that the maximum allowable stress was greater then the actual stress. It is concluded that the existing supports fulfil the safety requirement

  7. Pipelines. Economy's veins; Pipelines. Adern der Wirtschaft

    Energy Technology Data Exchange (ETDEWEB)

    Feizlmayr, Adolf; Goestl, Stefan [ILF Beratende Ingenieure, Muenchen (Germany)

    2011-02-15

    According to the existing prognoses more than 1 million km of gas pipelines, oil pipelines and water pipelines are built up to the year 2030. The predominant portion is from gas pipelines. The safe continued utilization of the aging pipelines is a large challenge. In addition, the diagnostic technology, the evaluation and risk assessment have to be developed further. With the design of new oil pipelines and gas pipelines, aspects of environmental protection, the energy efficiency of transport and thus the emission reduction of carbon dioxide, the public acceptance and the market strategy of the exporters gain in importance. With the offshore pipelines one soon will exceed the present border of 2,000 m depth of water and penetrate into larger sea depths.

  8. 78 FR 70623 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Science.gov (United States)

    2013-11-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0203] Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. [[Page...

  9. Automation of secondary loop operation in Indus-2 LCW plant

    International Nuclear Information System (INIS)

    Srinivas, L.; Pandey, R.M.; Yadav, R.P.; Gupta, S.; Gandhi, M.L.; Thakurta, A.C.

    2013-01-01

    Indus-2 Low Conductivity Water (LCW) plant has two loops, primary loop and secondary loop. The primary loop mainly supplies LCW to magnets, power supplies and RF systems at constant flow rate. The secondary loop extracts heat from the primary loop through heat exchangers to maintain the supply water temperature of the primary loop around a set value. The supply water temperature of the primary loop is maintained by operating the pumps and cooling towers in the secondary loop. The desired water flow rate in the secondary loop is met by the manual operation of the required number of the pumps. The automatic operation of the pumps and the cooling towers is proposed to replace the existing inefficient manual operation. It improves the operational reliability and ensures the optimum utilization of the pumps and the cooling towers. An algorithm has been developed using LabView programming to achieve optimized operation of the pumps and the cooling towers by incorporating First-In-First-Out (FIFO) logic. It also takes care of safety interlocks, and generates alarms. The program exchanges input and output signals of the plant using existing SCADA system. In this paper, the development of algorithm, its design and testing are elaborated. In the end, the results obtained thereof are discussed. (author)

  10. High-Temperature Structural Analysis of a Small-Scale PHE Prototype under the Test Condition of a Small-Scale Gas Loop

    International Nuclear Information System (INIS)

    Song, K.; Hong, S.; Park, H.

    2012-01-01

    A process heat exchanger (PHE) is a key component for transferring the high-temperature heat generated from a very high-temperature reactor (VHTR) to a chemical reaction for the massive production of hydrogen. The Korea Atomic Energy Research Institute has designed and assembled a small-scale nitrogen gas loop for a performance test on VHTR components and has manufactured a small-scale PHE prototype made of Hastelloy-X alloy. A performance test on the PHE prototype is underway in the gas loop, where different kinds of pipelines connecting to the PHE prototype are tested for reducing the thermal stress under the expansion of the PHE prototype. In this study, to evaluate the high-temperature structural integrity of the PHE prototype under the test condition of the gas loop, a realistic and effective boundary condition imposing the stiffness of the pipelines connected to the PHE prototype was suggested. An equivalent spring stiffness to reduce the thermal stress under the expansion of the PHE prototype was computed from the bending deformation and expansion of the pipelines connected to the PHE. A structural analysis on the PHE prototype was also carried out by imposing the suggested boundary condition. As a result of the analysis, the structural integrity of the PHE prototype seems to be maintained under the test condition of the gas loop.

  11. Application of leak-before-break to primary loop piping to eliminate pipe whip restraints in a Spanish nuclear power plant

    International Nuclear Information System (INIS)

    Rodriguez, M.; Esteban, A.

    1990-01-01

    The Spanish plant described in this study is a 982 MWe PWR with a three-loop primary circuit of piping made from centrifugally-cast stainless steel SA351 CF8A. The licensee requested from Consejo de Seguridad Nuclear (CSN) an exemption from the general design criterion, GDC-4, so as to avoid the need to postulate a guillotine rupture of the primary loop piping. The request was based on the generic work performed for a US PWR plant group in order to have such an exemption. As the piping material in the Spanish plant is different from that in the plants included in the generic work, CSN performed a review of the applicability of the generic results to the Spanish plant. Also, aspects such as fatigue evaluation, net section collapse, crack growth and leak detection, specifically analyzed for the Spanish plant, were reviewed. CSN found that fracture toughness test results from generic work are applicable to the Spanish plant; sufficient margin exists against unstable crack extension, and adequate leak detection capability exists with the leakage detection systems available in the plant. Exemption from GDC-4 was approved and CSN authorized the licensee to remove protection devices against dynamic loads from guillotine breaks in the primary coolant loops. (author)

  12. SCC of Alloy 600 components in PWR primary loop

    International Nuclear Information System (INIS)

    Gomez-Briceno, Dolores; Lapena, Jesus; Castano, M. Luisa; Blazquez, Fernando

    2002-01-01

    initiation time has been determined. A detailed fractographic study of the fracture surface points out that the appearance of the fracture, intergranular in all the cases, is related to the susceptibility of the material. For the crack growth rate test, CT specimens tested under constant load were used. Specimens were fabricated from five Alloy 600 heats (two forged bars, cold work and hot work tubes, and a plate) with yield strength ranging from 280 to 413 MPa. Crack growth rate data were obtained at temperatures between 290 and 330 deg. C. Activation energy for both processes, crack initiation and propagation has been determined. On the other hand, in January 1994, during a refueling outage, an ID axial throughwall crack was detected in one of the RVH nozzle of Jose Cabrera Nuclear Plant in Spain. Extensive NDE examination of all the vessel head penetrations confirmed ID axially oriented indications in several of the nozzles. The cause of the extensive cracking detected was identified as an IGA/SCC process in primary water contaminated with sulphur species due to a cation resin ingress in the primary loop during the early 1980s. In order to confirm the postulated degradation process and to assess its relevance for other alloy 600 components in the reactor primary loop, an experimental program was performed. The scope of this program included to study the behaviour of sensitised alloy 600 in the water conditions postulated as the cause of the cracking and to obtain crack growth rate data in similar conditions, at 285 and 325 deg. C. In addition, the behaviour of the sensitised alloy 600 in shutdown conditions was also studied. In this paper the main results of these experimental programs, including no published data, will be presented and discussed in the light of the available results from other laboratories. (author)

  13. 76 FR 53086 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-08-25

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT...

  14. Review of the Factors that Influence the Condition of Wax Deposition in Subsea Pipelines

    Directory of Open Access Journals (Sweden)

    Koh Junyi

    2018-03-01

    Full Text Available When crude oil is transported via sub-sea pipeline, the temperature of the pipeline decreases at a deep depth which causes a difference in temperature with the crude oil inside. This causes the crude oil to dissipate its heat to the surrounding until thermal equilibrium is achieved. This is also known as the cloud point where wax begins to precipitate and solidifies at the walls of the pipeline which obstruct the flow of fluid. The main objective of this review is to quantify the factors that influence wax deposition such as temperature difference between the wall of the pipeline and the fluid flowing within, the flow rate of the fluid in the pipeline and residence time of the fluid in the pipeline. It is found the main factor that causes wax deposition in the pipeline is the difference in temperature between the petroleum pipeline and the fluid flowing within. Most Literature deduces that decreasing temperature difference results in lower wax content deposited on the wall of the pipeline. The wax content increases with rising flow rate. As for the residence time, the amount of deposited wax initially increases when residence time increases until it reaches a peak value and gradually decreases. Flow-loop system and cold finger apparatus were used in literature investigations to determine the trends above. Three new models are generated through a regression analysis based on the results from other authors. These new models form a relationship between temperature difference, flow rate, residence time and Reynolds number with wax deposition. These models have high values of R-square and adjusted R-square which demonstrate the reliability of these models.

  15. 76 FR 70953 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket ID PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Advance notice of...

  16. Corrosion and deposition behaviour of 60Co and 54Mn in the SNR mockup loop for the primary sodium system

    International Nuclear Information System (INIS)

    Menken, G.; Reichel, H.

    1976-01-01

    The SNR corrosion mockup loop, simulating the SNR primary system is described. The influence of hydraulic conditions and temperature on the deposition behaviour is studied. γ-spectroscopy measurements at the pipe-work and removable samples allowed to determine the distribution of radioactive corrosion products in the loop and by-pass system. The release rate of Mn 54 could be reduced by a factor of 3 by decreasing the cold trap temperature from 165 0 C to 105 0 C while the Co 60 release rate could be reduced by a factor of 14, respectively. High temperature loop sections (873K) representing 13% of the loop surface absorbed 50-60% of the released Co 60 and only 8 - 18% of the Mn 54. The cold trap absorbed not more than 1% of the Co 60 and 10% of the Mn 54 inventory. (author)

  17. Feasibility analysis of the Primary Loop of Pool-Type Natural Circulating Nuclear Reactor Dedicated to Seawater Desalination

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woonho; Jeong, Yong Hoon [KAIST, Daejeon (Korea, Republic of)

    2016-05-15

    In this study, the feasibility of natural circulation was evaluated for the reference plant AHR400 (Advanced Heating Reactor 400MWth). AHR400 is a pool-type desalination-dedicated nuclear reactor. As a consequence, AHR400 has low operating pressure and temperature which provides large safety margin. Removal of the reactor coolant pump from the AHR400 will enforce integrity of the reactor vessel and passive safety feature. Therefore, the study also tried to find out optimized primary loop design to achieve total natural circulation of the coolant. Natural circulation capacity of the primary loop of the desalination dedicated nuclear reactor AHR400 was evaluated. It was concluded that to remove RCP from the AHR400 and operates the reactor only by natural circulation of the coolant is impossible. Decreased core power as half make removal of RCP possible with 15m central height difference between the core and IHXs. Furthermore, validation and modification of pressure loss coefficients by small-scaled natural circulation experiment at a pool-type reactor would provide more accurate results.

  18. Worldwide natural gas pipeline situation. Sekai no tennen gas pipeline jokyo

    Energy Technology Data Exchange (ETDEWEB)

    Arimoto, T [Osaka Gas Co. Ltd., Osaka (Japan)

    1993-03-01

    Constructing natural gas pipelines in wide areas requires investments of a huge amount. Many countries are building natural gas supply infrastructures under public support as nations' basic policy of promoting use of natural gas. This paper describes the present conditions of building pipelines in Western Europe, the U.S.A., Korea and Taiwan. In Western Europe, transporting companies established in line with the national policy own trunk pipelines and storage facilities, and import and distribute natural gas. The U.S.A. has 2300 small and large pipeline companies bearing transportation business. Pipelines extend about 1.9 million kilometers in total, with trunk pipelines accounting for about 440,000 kilometers. The companies are given eminent domain for the right of way. Korea has a plan to build a pipeline network with a distance of 1600 kilometers in around 2000. Taiwan has completed trunk pipelines extending 330 kilometers in two years. In Japan, the industry is preparing draft plans for wide area pipeline construction. 5 figs., 1 tab.

  19. ToTem: a tool for variant calling pipeline optimization.

    Science.gov (United States)

    Tom, Nikola; Tom, Ondrej; Malcikova, Jitka; Pavlova, Sarka; Kubesova, Blanka; Rausch, Tobias; Kolarik, Miroslav; Benes, Vladimir; Bystry, Vojtech; Pospisilova, Sarka

    2018-06-26

    High-throughput bioinformatics analyses of next generation sequencing (NGS) data often require challenging pipeline optimization. The key problem is choosing appropriate tools and selecting the best parameters for optimal precision and recall. Here we introduce ToTem, a tool for automated pipeline optimization. ToTem is a stand-alone web application with a comprehensive graphical user interface (GUI). ToTem is written in Java and PHP with an underlying connection to a MySQL database. Its primary role is to automatically generate, execute and benchmark different variant calling pipeline settings. Our tool allows an analysis to be started from any level of the process and with the possibility of plugging almost any tool or code. To prevent an over-fitting of pipeline parameters, ToTem ensures the reproducibility of these by using cross validation techniques that penalize the final precision, recall and F-measure. The results are interpreted as interactive graphs and tables allowing an optimal pipeline to be selected, based on the user's priorities. Using ToTem, we were able to optimize somatic variant calling from ultra-deep targeted gene sequencing (TGS) data and germline variant detection in whole genome sequencing (WGS) data. ToTem is a tool for automated pipeline optimization which is freely available as a web application at  https://totem.software .

  20. PipelineDog: a simple and flexible graphic pipeline construction and maintenance tool.

    Science.gov (United States)

    Zhou, Anbo; Zhang, Yeting; Sun, Yazhou; Xing, Jinchuan

    2018-05-01

    Analysis pipelines are an essential part of bioinformatics research, and ad hoc pipelines are frequently created by researchers for prototyping and proof-of-concept purposes. However, most existing pipeline management system or workflow engines are too complex for rapid prototyping or learning the pipeline concept. A lightweight, user-friendly and flexible solution is thus desirable. In this study, we developed a new pipeline construction and maintenance tool, PipelineDog. This is a web-based integrated development environment with a modern web graphical user interface. It offers cross-platform compatibility, project management capabilities, code formatting and error checking functions and an online repository. It uses an easy-to-read/write script system that encourages code reuse. With the online repository, it also encourages sharing of pipelines, which enhances analysis reproducibility and accountability. For most users, PipelineDog requires no software installation. Overall, this web application provides a way to rapidly create and easily manage pipelines. PipelineDog web app is freely available at http://web.pipeline.dog. The command line version is available at http://www.npmjs.com/package/pipelinedog and online repository at http://repo.pipeline.dog. ysun@kean.edu or xing@biology.rutgers.edu or ysun@diagnoa.com. Supplementary data are available at Bioinformatics online.

  1. United States petroleum pipelines: An empirical analysis of pipeline sizing

    Science.gov (United States)

    Coburn, L. L.

    1980-12-01

    The undersizing theory hypothesizes that integrated oil companies have a strong economic incentive to size the petroleum pipelines they own and ship over in a way that means that some of the demand must utilize higher cost alternatives. The DOJ theory posits that excess or monopoly profits are earned due to the natural monopoly characteristics of petroleum pipelines and the existence of market power in some pipelines at either the upstream or downstream market. The theory holds that independent petroleum pipelines owned by companies not otherwise affiliated with the petroleum industry (independent pipelines) do not have these incentives and all the efficiencies of pipeline transportation are passed to the ultimate consumer. Integrated oil companies on the other hand, keep these cost efficiencies for themselves in the form of excess profits.

  2. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  3. 77 FR 31347 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Availability of the Environmental Assessment...

    Science.gov (United States)

    2012-05-25

    ... environmental assessment (EA) for the MPP Project, proposed by Tennessee Gas Pipeline Company, L.L.C. (TGP) in the above-referenced docket. TGP requests authorization to construct and operate 7.9 miles of looped... connection with its evaluation of TGP's Clean Water Act (Section 404) permit application for the MPP Project...

  4. Frequency spectrum method-based stress analysis for oil pipelines in earthquake disaster areas.

    Directory of Open Access Journals (Sweden)

    Xiaonan Wu

    Full Text Available When a long distance oil pipeline crosses an earthquake disaster area, inertial force and strong ground motion can cause the pipeline stress to exceed the failure limit, resulting in bending and deformation failure. To date, researchers have performed limited safety analyses of oil pipelines in earthquake disaster areas that include stress analysis. Therefore, using the spectrum method and theory of one-dimensional beam units, CAESAR II is used to perform a dynamic earthquake analysis for an oil pipeline in the XX earthquake disaster area. This software is used to determine if the displacement and stress of the pipeline meet the standards when subjected to a strong earthquake. After performing the numerical analysis, the primary seismic action axial, longitudinal and horizontal displacement directions and the critical section of the pipeline can be located. Feasible project enhancement suggestions based on the analysis results are proposed. The designer is able to utilize this stress analysis method to perform an ultimate design for an oil pipeline in earthquake disaster areas; therefore, improving the safe operation of the pipeline.

  5. Frequency spectrum method-based stress analysis for oil pipelines in earthquake disaster areas.

    Science.gov (United States)

    Wu, Xiaonan; Lu, Hongfang; Huang, Kun; Wu, Shijuan; Qiao, Weibiao

    2015-01-01

    When a long distance oil pipeline crosses an earthquake disaster area, inertial force and strong ground motion can cause the pipeline stress to exceed the failure limit, resulting in bending and deformation failure. To date, researchers have performed limited safety analyses of oil pipelines in earthquake disaster areas that include stress analysis. Therefore, using the spectrum method and theory of one-dimensional beam units, CAESAR II is used to perform a dynamic earthquake analysis for an oil pipeline in the XX earthquake disaster area. This software is used to determine if the displacement and stress of the pipeline meet the standards when subjected to a strong earthquake. After performing the numerical analysis, the primary seismic action axial, longitudinal and horizontal displacement directions and the critical section of the pipeline can be located. Feasible project enhancement suggestions based on the analysis results are proposed. The designer is able to utilize this stress analysis method to perform an ultimate design for an oil pipeline in earthquake disaster areas; therefore, improving the safe operation of the pipeline.

  6. Removable pipeline plug

    International Nuclear Information System (INIS)

    Vassalotti, M.; Anastasi, F.

    1984-01-01

    A removable plugging device for a pipeline, and particularly for pressure testing a steam pipeline in a boiling water reactor, wherein an inflatable annular sealing member seals off the pipeline and characterized by radially movable shoes for holding the plug in place, each shoe being pivotally mounted for self-adjusting engagement with even an out-of-round pipeline interior

  7. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  8. 75 FR 13342 - Pipeline Safety: Workshop on Distribution Pipeline Construction

    Science.gov (United States)

    2010-03-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... natural gas distribution construction. Natural gas distribution pipelines are subject to a unique subset... distribution pipeline construction practices. This workshop will focus solely on natural gas distribution...

  9. Inhibitor selection for internal corrosion control of pipelines: experience with field monitoring and measurement

    Energy Technology Data Exchange (ETDEWEB)

    Demoz, A.; Michaelian, K.H.; Donini, J. [Natural Resources Canada, CANMET Western Research Centre, Devon, AB (Canada); Papavinasam, S.; Revie, R.W. [Natural Resources Canada, CANMET Materials Technology Laboratory, Ottawa, ON (Canada)

    1999-07-01

    A loop of pipe consisting of pipe segments of 3 inches, 6 inches and 10 inches that could take the full flow of a production well was designed, constructed and put in-line close to a wellhead. The loop was able to simulate multiphase pipelines and had ports for coupons, some of which were used for electrochemical monitoring. Various techniques including electrochemical impedance spectroscopy (EIS), electrochemical noise (ECN), and linear polarization resistance (LPR) were employed, all of which gave corrosion rates that depended on the position of the coupons inside the loop (increasing from top to bottom, reflecting the media and flow to which coupons were exposed in a multiphase producing well). Results indicated that the general corrosion rates obtained were dependent on the method used for measurement, but following the relative trend of LPR>weight loss>EIS>ECN. 20 refs., 8 figs.

  10. Feasibility Studies on Pipeline Disposal of Concentrated Copper Tailings Slurry for Waste Minimization

    Science.gov (United States)

    Senapati, Pradipta Kumar; Mishra, Barada Kanta

    2017-06-01

    The conventional lean phase copper tailings slurry disposal systems create pollution all around the disposal area through seepage and flooding of waste slurry water. In order to reduce water consumption and minimize pollution, the pipeline disposal of these waste slurries at high solids concentrations may be considered as a viable option. The paper presents the rheological and pipeline flow characteristics of copper tailings samples in the solids concentration range of 65-72 % by weight. The tailings slurry indicated non-Newtonian behaviour at these solids concentrations and the rheological data were best fitted by Bingham plastic model. The influence of solids concentration on yield stress and plastic viscosity for the copper tailings samples were discussed. Using a high concentration test loop, pipeline experiments were conducted in a 50 mm nominal bore (NB) pipe by varying the pipe flow velocity from 1.5 to 3.5 m/s. A non-Newtonian Bingham plastic pressure drop model predicted the experimental data reasonably well for the concentrated tailings slurry. The pressure drop model was used for higher size pipes and the operating conditions for pipeline disposal of concentrated copper tailings slurry in a 200 mm NB pipe with respect to specific power consumption were discussed.

  11. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1998-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  12. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J. [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1997-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  13. A Novel Method to Enhance Pipeline Trajectory Determination Using Pipeline Junctions.

    Science.gov (United States)

    Sahli, Hussein; El-Sheimy, Naser

    2016-04-21

    Pipeline inspection gauges (pigs) have been used for many years to perform various maintenance operations in oil and gas pipelines. Different pipeline parameters can be inspected during the pig journey. Although pigs use many sensors to detect the required pipeline parameters, matching these data with the corresponding pipeline location is considered a very important parameter. High-end, tactical-grade inertial measurement units (IMUs) are used in pigging applications to locate the detected problems of pipeline using other sensors, and to reconstruct the trajectories of the pig. These IMUs are accurate; however, their high cost and large sizes limit their use in small diameter pipelines (8″ or less). This paper describes a new methodology for the use of MEMS-based IMUs using an extended Kalman filter (EKF) and the pipeline junctions to increase the position parameters' accuracy and to reduce the total RMS errors even during the unavailability of above ground markers (AGMs). The results of this new proposed method using a micro-electro-mechanical systems (MEMS)-based IMU revealed that the position RMS errors were reduced by approximately 85% compared to the standard EKF solution. Therefore, this approach will enable the mapping of small diameter pipelines, which was not possible before.

  14. 77 FR 37032 - Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2012-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-14-000] Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned JL 47 Loop Project, Request for Comments on Environmental Issues, and Notice of Onsite Review The staff of the Federal Energy Regulatory Commission (FERC or Commissio...

  15. Pollution from pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    During the 1980s, over 3,900 spills from land-based pipelines released nearly 20 million gallons of oil into U.S. waters-almost twice as much as was released by the March 1989 Exxon Valdez oil spill. Although the Department of Transportation is responsible for preventing water pollution from petroleum pipelines, GAO found that it has not established a program to prevent such pollution. DOT has instead delegated this responsibility to the Coast Guard, which has a program to stop water pollution from ships, but not from pipelines. This paper reports that, in the absence of any federal program to prevent water pollution from pipelines, both the Coast Guard and the Environmental Protection Agency have taken steps to plan for and respond to oil spills, including those from pipelines, as required by the Clean Water Act. The Coast Guard cannot, however, adequately plan for or ensure a timely response to pipeline spills because it generally is unaware of specific locations and operators of pipelines

  16. 75 FR 63774 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Science.gov (United States)

    2010-10-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of... Gas Pipeline Safety Act of 1968, Public Law 90-481, delegated to DOT the authority to develop...

  17. 77 FR 61825 - Pipeline Safety: Notice of Public Meeting on Pipeline Data

    Science.gov (United States)

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... program performance measures for gas distribution, gas transmission, and hazardous liquids pipelines. The... distribution pipelines (49 CFR 192.1007(e)), gas transmission pipelines (49 CFR 192.945) and hazardous liquids...

  18. Pipelines 'R' us

    International Nuclear Information System (INIS)

    Thomas, P.

    1997-01-01

    The geopolitical background to the export of oil and gas from Kazakhstan by pipeline is explored with particular reference to the sensitivities of the USA. There are now a number of pipeline proposals which would enable Kazakhstan to get its hydrocarbons to world markets. The construction of two of these formed part of a major oil deal signed recently with China in the face of stiff competition from major US companies. The most convenient and cost effective route, connecting up with Iran's existing pipeline network to the Gulf, is unlikely to be developed given continuing US sanctions against Iran. Equally unlikely seems to be the Turkmenistan to Pakistan pipeline in the light of the political volatility of Afghanistan. US companies continue to face limits on export capacity via the existing Russian pipelines from Kazakhstan. A temporary solution could be to carry some oil in the existing pipeline from Azerbaijan to Georgia which has been upgraded and is due to become operational soon, and later in a second proposed pipeline on this route. The Caspian Pipeline Consortium, consisting of three countries and eleven international companies, is building a 1500 km pipeline from the Tergiz field to Novorossiysk on the Black Sea with a view to completion in 2000. An undersea pipeline crossing the Caspian from Azerbaijan is being promoted by Turkey. There is an international perception that within the next five years Kazakhstan could be in a position to export its oil via as many as half a dozen different routes. (UK)

  19. Identification of Standing Pressure Waves Sources in Primary Loops of NPP with WWER and PWR

    Directory of Open Access Journals (Sweden)

    K.N. Proskuriakov

    2016-05-01

    Full Text Available Results of measurement and calculation of Eigen frequencies of coolant pressure oscillations in primary loops of NPP are presented. The simple calculation model based on equivalence of electric circuit with elastic wave propagation in liquids and gases, which gives a sensible interpretation of standing pressure waves sources is developed. It is shown, that pressurizer manifest itself as managed Helmholtz resonator generating a number of SPW (with Eigen frequencies of steam volume, water volume and their combination with coolant volume of respiratory line.

  20. Development and Applications of Pipeline Steel in Long-Distance Gas Pipeline of China

    Science.gov (United States)

    Chunyong, Huo; Yang, Li; Lingkang, Ji

    In past decades, with widely utilizing of Microalloying and Thermal Mechanical Control Processing (TMCP) technology, the good matching of strength, toughness, plasticity and weldability on pipeline steel has been reached so that oil and gas pipeline has been greatly developed in China to meet the demand of strong domestic consumption of energy. In this paper, development history of pipeline steel and gas pipeline in china is briefly reviewed. The microstructure characteristic and mechanical performance of pipeline steel used in some representative gas pipelines of china built in different stage are summarized. Through the analysis on the evolution of pipeline service environment, some prospective development trend of application of pipeline steel in China is also presented.

  1. Probability of pipe fracture in the primary coolant loop of a PWR plant. Volume 3: nonseismic stress analysis. Final report

    International Nuclear Information System (INIS)

    Chan, A.L.; Curtis, D.J.; Rybicki, E.F.; Lu, S.C.

    1981-08-01

    This volume describes the analyses used to evaluate stresses due to loads other than seismic excitations in the primary coolant loop piping of a selected four-loop pressurized water reactor nuclear power station. The results of the analyses are used as input to a simulation procedure for predicting the probability of pipe fracture in the primary coolant system. Sources of stresses considered in the analyses are pressure, dead weight, thermal expansion, thermal gradients through the pipe wall, residual welding, and mechanical vibrations. Pressure and thermal transients arising from plant operations are best estimates and are based on actual plant operation records supplemented by specified plant design conditions. Stresses due to dead weight and thermal expansion are computed from a three-dimensional finite element model that uses a combination of pipe, truss, and beam elements to represent the reactor coolant loop piping, reactor pressure vessel, reactor coolant pumps, steam generators, and the pressurizer. Stresses due to pressure and thermal gradients are obtained by closed-form solutions. Calculations of residual stresses account for the actual heat impact, welding speed, weld preparation geometry, and pre- and post-heat treatments. Vibrational stresses due to pump operation are estimated by a dynamic analysis using existing measurements of pump vibrations

  2. 76 FR 44985 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2011-07-27

    .... PHMSA-2011-0177] Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding AGENCY... liquid pipelines to communicate the potential for damage to pipeline facilities caused by severe flooding... pipelines in case of flooding. ADDRESSES: This document can be viewed on the Office of Pipeline Safety home...

  3. Pipeline technology. Petroleum oil - long-distance pipelines. Pipelinetechnik. Mineraloelfernleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Krass, W; Kittel, A; Uhde, A

    1979-01-01

    All questions and concerns of pipeline technique are dealt with in detail. Some chapters can be applied for petroleum pipelines only or partly, for example the importance of petroleum pipelines, projecting, calculation, and operation. The sections of pipes and formings, laying, rights of way, and corrosion protection, accessories and remote effect technique, however, are of general interest, for example also for gas pipelines. In the chapter on working material, a very good summary of today's pipe working material including the thermomechanically treated steels is given. Besides methods of improving the toughness, the problems of the corrosion caused by strain cracking and the ways of avoiding it are pointed out. The pipe producing methods and, in the end of the chapter, the tests in the factory are explained. The section of laying deals with the laying methods being applied for years in pipeline construction, a big part referring to welding methods and tests. Active and passive corrosion protection are explained with all details. In addition to the solidity calculation presented with special regard to concerns of petroleum pipelines, theoretical fundaments and calculation methods for pressure are dealt with. Beside general questions of pumps, accessories, and drives, there is a section dealing with measurement and control techniques. Furthermore, remote effect and transmission techniques and news systems are explained in detail. Here, problems are referred to which are applicable not only to the operation of mineral oil pipelines. The book is completed by indications as to pipeline operation emphasizing general operation control, maintenance, repair methods and damage and their elimination. The last chapter contains a collection of the legal fundaments and the technical rules.

  4. Gathering pipeline methane emissions in Fayetteville shale pipelines and scoping guidelines for future pipeline measurement campaigns

    Directory of Open Access Journals (Sweden)

    Daniel J. Zimmerle

    2017-11-01

    Full Text Available Gathering pipelines, which transport gas from well pads to downstream processing, are a sector of the natural gas supply chain for which little measured methane emissions data are available. This study performed leak detection and measurement on 96 km of gathering pipeline and the associated 56 pigging facilities and 39 block valves. The study found one underground leak accounting for 83% (4.0 kg CH4/hr of total measured emissions. Methane emissions for the 4684 km of gathering pipeline in the study area were estimated at 402 kg CH4/hr [95 to 1065 kg CH4/hr, 95% CI], or 1% [0.2% to 2.6%] of all methane emissions measured during a prior aircraft study of the same area. Emissions estimated by this study fall within the uncertainty range of emissions estimated using emission factors from EPA’s 2015 Greenhouse Inventory and study activity estimates. While EPA’s current inventory is based upon emission factors from distribution mains measured in the 1990s, this study indicates that using emission factors from more recent distribution studies could significantly underestimate emissions from gathering pipelines. To guide broader studies of pipeline emissions, we also estimate the fraction of the pipeline length within a basin that must be measured to constrain uncertainty of pipeline emissions estimates to within 1% of total basin emissions. The study provides both substantial insight into the mix of emission sources and guidance for future gathering pipeline studies, but since measurements were made in a single basin, the results are not sufficiently representative to provide methane emission factors at the regional or national level.

  5. Calculation models of pressure wave propagation within the WWER-440 primary circulating loop

    International Nuclear Information System (INIS)

    Adamik, V.; Tkach, A.

    1982-01-01

    Computer codes SHOCK, LOVE, BAREL are described that can be used for the study of pressure wave propagation within the reactor and pipeline system during a LOCA as well as for mechanical loads identification in various parts of the system. SHOCK code is applicable to one-dimensional pressure wave propagation analysis in any hydraulic network containing a compressible nonviscous liquid with a constant (within the considered transient process period) density. LOVE code allows to calculate non-symmetrical mechanical loads on the WWER shaft in case of the main circulation pipeline cold branch rupture. BAREL code is an advanced modification of SHOCK code. It is fitted for two-dimensional pressure wave propagation analysing in the downstream section of a pressurised water reactor in case of the main circulation pipeline cold branch rupture. The calculation results for B-213 type WWER-440 reactor are presented that have been obtained under the assumption of perfect structure rigidity [ru

  6. 77 FR 34123 - Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines

    Science.gov (United States)

    2012-06-08

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0100] Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines AGENCY: Office of Pipeline Safety, Pipeline and Hazardous Materials Safety Administration, DOT. ACTION...

  7. KENYA’S OIL PIPELINE AND TERRORISM

    Directory of Open Access Journals (Sweden)

    E.O.S.ODHIAMBO

    2014-04-01

    Full Text Available The threat of Al-Shabaab and Al-Qaeda terrorist attacks on the critical infrastructure (oil pipeline in Kenya has brought to the attention the strategic issue of the energy sector security, highlighting the potential vulnerabilities of this sector. Critical Infrastructure Protection (CIP should be a key component of the national security especially after the Kenya Defence Forces’ (KDF incursion into Somalia. The merger of Al-Shabaab and Al-Qaeda terrorist groups and the accelerated grenades attack against Kenya in retaliation has become the centre of the debate on terrorism and internal security of the Kenya. The energy resources are strategic assets from the security, political and economic point of view. Kenya as an oil transit country is considered of primary strategic importance at international level. International terrorism has always looked with interest at the oil resource in order to meet its political and economic targets. We argue that Kenya’s oil pipelines are vulnerable to Al-Shabaab and Al-Qaeda terrorist attack. In summary, the article looks at the concept of terrorism within the framework of critical infrastructure protection, the dangers of attacks on oil pipelines, Kenya’s government preparedness and recommendations.

  8. A New Concept for an Effective Leak Detection and Loclisation in Multiphase Fluid Pipelines

    Directory of Open Access Journals (Sweden)

    Mahmoud Meribout

    2011-02-01

    Full Text Available The aim of this paper is to present a secure wireless sensor network-based infrastructure for fast and accurate detection of eventual leaks that might occur in multiphase pipelines (i.e., pipelines which carry simultaneously more than one fluid. The system is scalable to monitor long distances of pipelines. It consists of a newly designed low cost pipeline set which is composed of an inner pipe that carries the multiphase fluid, surrounded by a second outer pipe that holds the leak detection unit. This latest comprises an air-ultrasonic sensor which continuously senses the presence of the leak. The location of the leak is determined by a bidirectional microphone. Both these sensors are interfaced to a wireless sensor module which performs control, signal processing, and transmission tasks. Hence, the second contribution of the paper is to provide a new secure and reliable communication protocol that takes into consideration the nature of the network in terms of packets patterns and hardware constraints of the communicating nodes. Online tests in a laboratory scale flow loop indicate that the system is capable to accurately determine the location of the leak and its rate (in l/min in fast response time for different scenarios of leaks.

  9. 75 FR 5244 - Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction

    Science.gov (United States)

    2010-02-02

    ... Management Program for Gas Distribution Pipelines; Correction AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Regulations to require operators of gas distribution pipelines to develop and implement integrity management...

  10. Case histories of pipeline exposure at stream crossings in Alberta

    Energy Technology Data Exchange (ETDEWEB)

    Malcovish, C.D. [Malaron Engineering Ltd., St. Albert, AB (Canada); Janz, A. [ATCO Pipelines, Edmonton, AB (Canada); Gray, D.M. [Gulf Midstream Services, Edmonton, AB (Canada)

    2000-07-01

    Five case histories of river channel changes and associated pipeline exposure problems at river and stream crossings in Alberta were discussed with emphasis on the need for proactive inspection. For each case, the different hydrologic and geomorphic factors that resulted in erosion problems were reviewed and the mitigative actions that were taken to solve the problems were described. It was shown that in some cases, there are inherent difficulties in identifying potential erosion problems at the project design stage. It was also demonstrated that systematic monitoring and inspection procedures are useful for planning and implementing remedial measures before problems occur. There are many natural and anthropogenic causes of channel degradation. Upstream progressing degradation is usually the most common problem encountered at pipeline crossings in Alberta. The two main causes are both flood related. They include channel shortening by cutoffs across long meandering loops, and washout of downstream slope controls such as large beaver dams. The five case studies presented in this paper were: (1) North Saskatchewan River crossing near Drayton Valley, (2) Smoky River crossing near Grande Cache, (3) Hells Creek crossing near Grande Cache, (4) Modeste Creek crossing near Breton, and (5) Freeman River crossing near Swan Hills. It was emphasized that pipeline operators must consider past channel changes and geomorphic analysis to predict future channel instability. 15 figs.

  11. Process and kinetics of the fundamental radiation-electrochemical reactions in the primary coolant loop of nuclear reactors

    International Nuclear Information System (INIS)

    Kozomara-Maic, S.

    1987-06-01

    In spite of the rather broad title of this report, its major part is devoted to the corrosion problems at the RA reactor, i.e. causes and consequences of the reactor shutdown in 1979 and 1982. Some problems of reactor chemistry are pointed out because they are significant for future reactor operation. The final conclusion of this report is that corrosion processes in the primary coolant circuit of the nuclear reactor are specific and that radiation effects cannot be excluded when processes and reaction kinetics are investigated. Knowledge about the kinetics of all the chemical reactions occurring in the primary coolant loop are of crucial significance for safe and economical reactor operation [sr

  12. Friction factor in smooth and rough gas pipelines. An experimental study

    Energy Technology Data Exchange (ETDEWEB)

    Sletfjerding, Elling

    1999-01-01

    Flow of high pressure natural gas in pipelines has been studied experimentally. Pipeline flow of natural gas is characterized by high Reynolds numbers due to the low viscosity and relatively high density of pressurized gas. Friction factor correlations for high Reynolds number flow in smooth and rough pipes were developed. To study the effect of wall roughness on pipe flow at high Reynolds numbers 8 test pipes with different wall roughness were fabricated. The wall roughness in 6 of the test pipes was varied by adding glass beads in an epoxy coating applied on the pipe wall. One test pipe was treated with a smooth epoxy coating and one was left untreated. The inner diameter of the test pipes was 150 mm. Measurements of the pressure drop in the pipes were made in a closed flow loop at line pressures of 25, 70, 95 and 120 bar. The Reynolds number of the flow was varied in the range 2-30 million. The wall roughness of the test pipes was measured with a stylus instrument. Correlations between the directly measured wall roughness and the friction factor at fully rough flow conditions were presented. To characterize the wall roughness of the test pipes a parameter combining a measure of the roughness height (R{sub q}) and the texture of the wall roughness was used. Due to the high Reynolds number of the flow, minute irregularities of the pipe wall had significant effect on the friction factor in the pipe. The measured wall roughness of the test pipes was in the range 1.4 < R{sub q} <31 (my)m. The flow experiments in test pipes was compared with data from operating pipelines in the North Sea. The offshore pipelines are coated with the same epoxy coating as used in the test pipes. The friction factor in coated offshore gas pipelines showed smooth behavior when the additional pressure drop due to welds were accounted for. The study of coated gas pipelines showed that the friction factor was significantly lower than predicted by standard correlations.

  13. Measurement data of cesium 137 yields in primary coolant of an in-pile water loop in fission products release experiment

    International Nuclear Information System (INIS)

    Ishiwatari, Nasumi; Nagai, Hitoshi; Takeda, Tsuneo

    1979-03-01

    Series of fuel rods (UO 2 pellets sheathed with stainless steel) having an artificial pinhole were irradiated in the in-pile test section of water loop JMTR OWL-1. Presented are the results of measurements of cesium 137 yields in primary coolant of OWL-1 from 1975 to 1978. (author)

  14. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  15. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  16. 78 FR 41991 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2013-07-12

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice; Issuance of Advisory... Gas and Hazardous Liquid Pipeline Systems. Subject: Potential for Damage to Pipeline Facilities Caused...

  17. 78 FR 41496 - Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees

    Science.gov (United States)

    2013-07-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0156] Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of advisory committee...

  18. FEM analysis of impact of external objects to pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gracie, Robert; Konuk, Ibrahim [Geological Survey of Canada, Ottawa, ON (Canada)]. E-mail: ikonuk@NRCan.gc.ca; Fredj, Abdelfettah [BMT Fleet Technology Limited, Ottawa, ON (Canada)

    2003-07-01

    One of the most common hazards to pipelines is impact of external objects. Earth moving machinery, farm equipment or bullets can dent or fail land pipelines. External objects such as anchors, fishing gear, ice can damage offshore pipelines. This paper develops an FEM model to simulate the impact process and presents investigations using the FEM model to determine the influence of the geometry and velocity of the impacting object and also will study the influence of the pipe diameter, wall thickness, and concrete thickness along with internal pressure. The FEM model is developed by using LS-DYNA explicit FEM software utilizing shell and solid elements. The model allows damage and removal of the concrete and corrosion coating elements during impact. Parametric studies will be presented relating the dent size to pipe diameter, wall thickness and concrete thickness, internal pipe pressure, and impacting object geometry. The primary objective of this paper is to develop and present the FEM model. The model can be applied to both offshore and land pipeline problems. Some examples are used to illustrate how the model can be applied to real life problems. A future paper will present more detailed parametric studies. (author)

  19. Overview of slurry pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gandhi, R L

    1982-01-01

    Slurry pipelines have proven to be a technically feasible, environmentally attractive and economic method of transporting finely divided particles over long distances. A pipeline system normally consists of preparation, pipeline and utilization facilities and requires optimization of all three components taken together. A considerable amount of research work has been done to develop hydraulic design of a slurry pipeline. Equipment selection and estimation of corrosion-erosion are considered to be as important as the hydraulic design. Future applications are expected to be for the large-scale transport of coal and for the exploitation of remotely located mineral deposits such as iron ore and copper. Application of slurry pipelines for the exploitation of remotely located mineral deposits is illustrated by the Kudremukh iron concentrate slurry pipeline in India.

  20. Pipeline Drag Reducers

    International Nuclear Information System (INIS)

    Marawan, H.

    2004-01-01

    Pipeline drag reducers have proven to be an extremely powerful tool in fluid transportation. High molecular weight polymers are used to reduce the frictional pressure loss ratio in crude oil pipelines, refined fuel and aqueous pipelines. Chemical structure of the main used pipeline drag reducers is one of the following polymers and copolymers classified according to the type of fluid to ; low density polyethylene, copolymer of I-hexane cross linked with divinyl benzene, polyacrylamide, polyalkylene oxide polymers and their copolymers, fluorocarbons, polyalkyl methacrylates and terpolymer of styrene, alkyl acrylate and acrylic acid. Drag reduction is the increase in pump ability of a fluid caused by the addition of small amounts of an additive to the fluid. The effectiveness of a drag reducer is normally expressed in terms of percent drag reduction. Frictional pressure loss in a pipeline system is a waste of energy and it costly. The drag reducing additive minimizes the flow turbulence, increases throughput and reduces the energy costs. The Flow can be increased by more than 80 % with existing assets. The effectiveness of the injected drag reducer in Mostorod to Tanta crude oil pipeline achieved 35.4 % drag reduction and 23.2 % flow increase of the actual performance The experimental application of DRA on Arab Petroleum Pipeline Company (Summed) achieved a flow increase ranging from 9-32 %

  1. North America pipeline map

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This map presents details of pipelines currently in place throughout North America. Fifty-nine natural gas pipelines are presented, as well as 16 oil pipelines. The map also identifies six proposed natural gas pipelines. Major cities, roads and highways are included as well as state and provincial boundaries. The National Petroleum Reserve is identified, as well as the Arctic National Wildlife Refuge. The following companies placed advertisements on the map with details of the services they provide relating to pipeline management and construction: Ferus Gas Industries Trust; Proline; SulfaTreat Direct Oxidation; and TransGas. 1 map

  2. 76 FR 303 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Science.gov (United States)

    2011-01-04

    ... leak detection requirements for all pipelines; whether to require the installation of emergency flow... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 195 [Docket ID PHMSA-2010-0229] RIN 2137-AE66 Pipeline Safety: Safety of On-Shore Hazardous Liquid...

  3. Analysis of stresses on buried pipeline subjected to landslide based on numerical simulation and regression analysis

    Energy Technology Data Exchange (ETDEWEB)

    Han, Bing; Jing, Hongyuan; Liu, Jianping; Wu, Zhangzhong [PetroChina Pipeline RandD Center, Langfang, Hebei (China); Hao, Jianbin [School of Petroleum Engineering, Southwest Petroleum University, Chengdu, Sichuan (China)

    2010-07-01

    Landslides have a serious impact on the integrity of oil and gas pipelines in the tough terrain of Western China. This paper introduces a solving method of axial stress, which uses numerical simulation and regression analysis for the pipelines subjected to landslides. Numerical simulation is performed to analyze the change regularity of pipe stresses for the five vulnerability assessment indexes, which are: the distance between pipeline and landslide tail; the thickness of landslide; the inclination angle of landslide; the pipeline length passing through landslide; and the buried depth of pipeline. A pipeline passing through a certain landslide in southwest China was selected as an example to verify the feasibility and effectiveness of this method. This method has practical applicability, but it would need large numbers of examples to better verify its reliability and should be modified accordingly. Also, it only considers the case where the direction of the pipeline is perpendicular to the primary slip direction of the landslide.

  4. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2013-01-01

    I artiklen undersøges det empiriske grundlag for Leader- ship Pipeline. Først beskrives Leadership Pipeline modellen om le- delsesbaner og skilleveje i opadgående transitioner mellem orga- nisatoriske ledelsesniveauer (Freedman, 1998; Charan, Drotter and Noel, 2001). Dernæst sættes fokus på det...... forholdet mellem kontinuitet- og diskontinuitet i ledel- seskompetencer på tværs af organisatoriske niveauer præsenteres og diskuteres. Afslutningsvis diskuteres begrænsningerne i en kompetencebaseret tilgang til Leadership Pipeline, og det foreslås, at succesfuld ledelse i ligeså høj grad afhænger af...

  5. 76 FR 29333 - Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical...

    Science.gov (United States)

    2011-05-20

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Technical Hazardous Liquid Pipeline Safety Standards Committee AGENCY: Pipeline and Hazardous Materials... for natural gas pipelines and for hazardous liquid pipelines. Both committees were established under...

  6. CFPL installs products pipeline with directional drilling

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland number-sign 70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line

  7. 77 FR 16471 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-03-21

    ... Registry of Pipeline and Liquefied Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Register (75 FR 72878) titled: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting...

  8. Applicability of IBAMA normative instruction 146-2007 to pipeline environmental licensing

    Energy Technology Data Exchange (ETDEWEB)

    Basbaum, Marcos A.; Fonseca, Renata A.A. [Servicos de Engenharia Emilio Baumgart Ltda. (SEEBLA), Rio de Janeiro, RJ(Brazil)], e-mail: mbasbaum.seebla@petrobras.com.br, e-mail: renataamorim.seebla@petrobras.com.br; Torggler, Bianca F.; Fernandes, Renato; Guimaraes, Ricardo Z.P. [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)], e-mail: torggler@petrobras.com.br, e-mail: renatofer@petrobras.com.br, e-mail: rzaluar@petrobras.com.br

    2009-07-01

    PETROBRAS has been conducting several wildlife programs in response to environmental licensing requirements from IBAMA (Brazilian environmental agency). Since 2007, IBAMA has been requiring the application of the Normative Instruction n. 146 (NI), which establishes criteria for wildlife management in the influence areas of new enterprises. However, experience from PETROBRAS has shown that many of the NI articles are not applicable to pipelines. Thus, a critical analysis of this NI was done based on data from company's wildlife programs. Our analysis indicated that the main NI items that do not apply to pipelines are: 1 - Animal rescue programs in deforested areas and selection of release areas, 2 - More than two fauna monitoring campaigns a year, 3 - Monitoring programs involving all groups of terrestrial vertebrates and also invertebrate classes. The non-applicability of these items is due to: 1 - The majority of pipelines are built in areas without significant native vegetation or with small fragments only, which are usually in secondary stage of ecological succession. Most pipelines scarcely involve removal of primary vegetation, 2 - Pipelines have an influence area restricted to a range of 800 m and the construction directly affects only strips from 20 m to 30 m, 3 - The most relevant impacts associated with pipelines are temporary, and do not persist during their operation. (author)

  9. 75 FR 45591 - Pipeline Safety: Notice of Technical Pipeline Safety Advisory Committee Meetings

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Committee Meetings AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  10. Time-Varying Hydraulic Gradient Model of Paste-Like Tailings in Long-Distance Pipeline Transportation

    Directory of Open Access Journals (Sweden)

    Li Yang

    2017-01-01

    Full Text Available Paste-like tailings slurry (PTLS is always simplified as a Bingham plastic fluid, leading to excessive computational errors in the calculation of the hydraulic gradient. In the case of paste-like tailings in long-distance pipeline transportation, to explore a high-precision and reliable hydraulic gradient formula, the rheological behavior of paste-like tailings slurry was analyzed, a time-varying hydraulic gradient model was constructed, and a series of laboratory shear tests were conducted. The results indicate that the PTLS shows noticeable shear-thinning characteristics in constant shear tests; the calculated hydraulic gradient declined by about 56%, from 4.44 MPa·km−1 to 1.95 MPa·km−1 within 253 s, and remained constant for the next four hours during the pipeline transportation. Comparing with the balance hydraulic gradient obtained in a semi-industrial loop test, the computational errors of those calculated by using the time-varying hydraulic gradient model, Jinchuan formula, and Shanxi formula are 15%, 78%, and 130%, respectively. Therefore, our model is a feasible and high-precision solution for the calculation of the hydraulic gradient of paste-like tailings in long-distance pipeline transportation.

  11. Mathematical modelling for magnetite (crude removal from primary heat transfer loop by ion-exchange resins

    Directory of Open Access Journals (Sweden)

    Zeeshan Nawaz

    2009-04-01

    Full Text Available The present research focuses to develop mathematical model for the removal of iron (magnetite by ion-exchange resin from primary heat transfer loop of process industries. This mathematical model is based on operating capacities (that’s provide more effective design as compared to loading capacity from static laboratory tests. Results showed non-steady state distribution of external Fe2+ and limitations imposed on operating conditions, these conditions includes; loading and elution cycle time, flow rate, concentration of both loading and removal, volume of resin required. Number of generalized assumptions was made under shortcut modeling techniques to overcome the gap of theoretical and actual process design.

  12. Decontamination device for pipeline

    International Nuclear Information System (INIS)

    Harashina, Heihachi.

    1994-01-01

    Pipelines to be decontaminated are parts of pipelines contaminated with radioactive materials, and they are connected to a fluid transfer means (for example, a bladeless pump) and a ball collector by way of a connector. The fluid of a mixture of chemical decontaminating liquid and spheres is sent into pipelines to be decontaminated. The spheres are, for example, heat resistant porous hard or soft rubber spheres. The fluid discharged from the pipelines to be decontaminated are circulated by way of bypassing means. The inner surface of the pipelines is decontaminated by the circulation of the fluid. When the bypass means is closed, the fluid discharged from the pipelines to be decontaminated is sent to the ball collector, and the spheres are captured by a hopper. Further, the liquid is sent to the filtrating means to filter the chemical contaminating liquid, and sludges contained in the liquid are captured. (I.N.)

  13. 77 FR 19799 - Pipeline Safety: Pipeline Damage Prevention Programs

    Science.gov (United States)

    2012-04-02

    ... noted ``when the oil pipeline industry developed the survey for its voluntary spill reporting system...) [cir] The American Public Gas Association (APGA) [cir] The Association of Oil Pipelines (AOPL) [cir... the contrary, all 50 states in the United States have a law designed to prevent excavation damage to...

  14. SimVascular 2.0: an Integrated Open Source Pipeline for Image-Based Cardiovascular Modeling and Simulation

    Science.gov (United States)

    Lan, Hongzhi; Merkow, Jameson; Updegrove, Adam; Schiavazzi, Daniele; Wilson, Nathan; Shadden, Shawn; Marsden, Alison

    2015-11-01

    SimVascular (www.simvascular.org) is currently the only fully open source software package that provides a complete pipeline from medical image based modeling to patient specific blood flow simulation and analysis. It was initially released in 2007 and has contributed to numerous advances in fundamental hemodynamics research, surgical planning, and medical device design. However, early versions had several major barriers preventing wider adoption by new users, large-scale application in clinical and research studies, and educational access. In the past years, SimVascular 2.0 has made significant progress by integrating open source alternatives for the expensive commercial libraries previously required for anatomic modeling, mesh generation and the linear solver. In addition, it simplified the across-platform compilation process, improved the graphical user interface and launched a comprehensive documentation website. Many enhancements and new features have been incorporated for the whole pipeline, such as 3-D segmentation, Boolean operation for discrete triangulated surfaces, and multi-scale coupling for closed loop boundary conditions. In this presentation we will briefly overview the modeling/simulation pipeline and advances of the new SimVascular 2.0.

  15. Recent developments in pipeline welding practice

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Fourteen chapters are included: overview of pipeline welding systems and quality assurance, CRC automatic welding system, H.C. Price Co. automatic welding system, semi-automatic MIG-welding process, partial penetration welding of steel pipes for gas distribution, construction procedures and quality control in offshore pipeline construction, welding in repair and maintenance of gas transmission pipelines, British Gas studies of welding on pressurized gas transmission pipelines, hot tapping pipelines, underwater welding for offshore pipelines and associated equipment, radial friction welding, material composition vs weld properties, review of NDT of pipeline welds, and safety assurance in pipeline construction. A bibliography of approximately 150 references is included, arranged according to subject and year.

  16. Self-oscillating loop based piezoelectric power converter

    DEFF Research Database (Denmark)

    2013-01-01

    The present invention relates to a piezoelectric power converter comprising an input driver electrically coupled directly to an input or primary electrode of the piezoelectric transformer without any intervening series or parallel inductor. A feedback loop is operatively coupled between an output......- oscillation loop within a zero-voltage-switching (ZVS) operation range of the piezoelectric transformer....

  17. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2012-01-01

    Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst.......Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst....

  18. Fundamental and Harmonic Oscillations in Neighboring Coronal Loops

    Science.gov (United States)

    Li, Hongbo; Liu, Yu; Vai Tam, Kuan

    2017-06-01

    We present observations of multimode (fundamental and harmonic) oscillations in a loop system, which appear to be simultaneously excited by a GOES C-class flare. Analysis of the periodic oscillations reveals that (1) the primary loop with a period of P a ≈ 4 minutes and a secondary loop with two periods of P a ≈ 4 minutes and P b ≈ 2 minutes are detected simultaneously in closely spaced loop strands; (2) both oscillation components have their peak amplitudes near the loop apex, while in the second loop the low-frequency component P a dominates in a loop segment that is two times larger than the high-frequency component P b ; (3) the harmonic mode P b shows the largest deviation from a sinusoidal loop shape at the loop apex. We conclude that multiple harmonic modes with different displacement profiles can be excited simultaneously even in closely spaced strands, similar to the overtones of a violin string.

  19. Economic model of pipeline transportation systems

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.

    1977-07-29

    The objective of the work reported here was to develop a model which could be used to assess the economic effects of energy-conservative technological innovations upon the pipeline industry. The model is a dynamic simulator which accepts inputs of two classes: the physical description (design parameters, fluid properties, and financial structures) of the system to be studied, and the postulated market (throughput and price) projection. The model consists of time-independent submodels: the fluidics model which simulates the physical behavior of the system, and the financial model which operates upon the output of the fluidics model to calculate the economics outputs. Any of a number of existing fluidics models can be used in addition to that developed as a part of this study. The financial model, known as the Systems, Science and Software (S/sup 3/) Financial Projection Model, contains user options whereby pipeline-peculiar characteristics can be removed and/or modified, so that the model can be applied to virtually any kind of business enterprise. The several dozen outputs are of two classes: the energetics and the economics. The energetics outputs of primary interest are the energy intensity, also called unit energy consumption, and the total energy consumed. The primary economics outputs are the long-run average cost, profit, cash flow, and return on investment.

  20. 49 CFR 195.210 - Pipeline location.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline location. 195.210 Section 195.210 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.210 Pipeline location. (a) Pipeline right-of-way must be selected to avoid, as...

  1. Incidental electric heating of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Sonninskii, A V; Sirotin, A M; Vasiliev, Y N

    1981-04-01

    VNIIgaz has improved the conventional Japanese SECT pipeline-heating system, which uses a small steel tube that contains an insulated heater/conductor and is welded to the top of the pipeline. The improved version has two insulated electric heaters - one on the top and the other on the bottom of the pipeline - located inside steel angle irons that are welded to the pipeline. A comparison of experimental results from heating a 200-ft pipeline with both systems at currents of up to 470 A clearly demonstrated the better heating efficiency of the VNIIgaz unit. The improved SECT system would be suitable for various types of pipelines, including gas lines, in the USSR's far north regions.

  2. 77 FR 2126 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-01-13

    ... Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements.'' The final rule...

  3. 77 FR 36606 - Pipeline Safety: Government/Industry Pipeline Research and Development Forum, Public Meeting

    Science.gov (United States)

    2012-06-19

    ...: Threat Prevention --Working Group 2: Leak Detection/Mitigation & Storage --Working Group 3: Anomaly... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0146] Pipeline Safety: Government/Industry Pipeline Research and Development Forum, Public...

  4. Pipelines : moving biomass and energy

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, A. [Alberta Univ., Edmonton, AB (Canada). Dept. of Mechanical Engineering

    2006-07-01

    Moving biomass and energy through pipelines was presented. Field sourced biomass utilization for fuel was discussed in terms of competing cost factors; economies of scale; and differing fuel plant sizes. The cost versus scale in a bioenergy facility was illustrated in chart format. The transportation cost of biomass was presented as it is a major component of total biomass processing cost and is in the typical range of 25-45 per cent of total processing costs for truck transport of biomass. Issues in large scale biomass utilization, scale effects in transportation, and components of transport cost were identified. Other topics related to transportation issues included approaches to pipeline transport; cost of wood chips in pipeline transport; and distance variable cost of transporting wood chips by pipeline. Practical applications were also offered. In addition, the presentation provided and illustrated a model for an ethanol plant supplied by truck transport as well as a sample configuration for 19 truck based ethanol plants versus one large facility supplied by truck plus 18 pipelines. Last, pipeline transport of bio-oil and pipeline transport of syngas was discussed. It was concluded that pipeline transport can help in reducing congestion issues in large scale biomass utilization and that it can offer a means to achieve large plant size. Some current research at the University of Alberta on pipeline transport of raw biomass, bio-oil and hydrogen production from biomass for oil sands and pipeline transport was also presented. tabs., figs.

  5. Pipeline four-dimension management is the trend of pipeline integrity management in the future

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Feifan; Zhongchen, Han [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    Pipeline integrity management is essential for today's operators to operate their pipelines safety and cost effectively. The latest developments of pipeline integrity management around the world are involved with change of regulation, industry standard and innovation of technology. And who know the trend of PIM in the future, which can be answered in the paper. As a result, the concept of P4DM was set up firstly in the world. The paper analyzed the pipeline HSE management, pipeline integrity management (PIM) and asset integrity management (AIM), the problem of management was produced, and also the Pipeline 4-dimension Management (P4DM) theory was brought forward. According to P4DM, from the hierarchy of P4DM, the management elements, fields, space and time was analyzed. The main content is P4DM integrate the space geography location and time, control and manage the pipeline system in whole process, anywhere and anytime. It includes the pipeline integrity, pipeline operation and emergency, which is integrated by IT system. It come true that the idea, solution, technology, organization, manager alternately intelligently control the process of management. What the paper talks about included the definition of pipeline 4D management, the research develop of P4DM, the theory of P4DM, the relationship between P4DM and PIM, the technology basis of P4DM, how to perform the P4DM and conclusion. The P4DM was produced, which provide the development direction of PIM in the future, and also provide the new ideas for PetroChina in the field of technology and management. (author)

  6. Pipelines to eastern Canada

    International Nuclear Information System (INIS)

    Otsason, J.

    1998-01-01

    This presentation focused on four main topics: (1) the existing path of pipelines to eastern Canada, (2) the Chicago hub, (3) transport alternatives, and (4) the Vector Pipeline' expansion plans. In the eastern Canadian market, TransCanada Pipelines dominates 96 per cent of the market share and is effectively immune to expansion costs. Issues regarding the attractiveness of the Chicago hub were addressed. One attractive feature is that the Chicago hub has access to multiple supply basins including western Canada, the Gulf Coast, the mid-continent, and the Rockies. Regarding Vector Pipelines' future plans, the company proposes to construct 343 miles of pipeline from Joliet, Illinois to Dawn, Ontario. Project description included discussion of some of the perceived advantages of this route, namely, extensive storage in Michigan and south-western Ontario, the fact that the proposed pipeline traverses major markets which would mitigate excess capacity concerns, arbitrage opportunities, cost effective expansion capability reducing tolls, and likely lower landed costs in Ontario. Project schedule, costs, rates and tariffs are also discussed. tabs., figs

  7. 78 FR 42889 - Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems

    Science.gov (United States)

    2013-07-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2013-0097] Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION...

  8. Mathematical Modeling of Loop Heat Pipes

    Science.gov (United States)

    Kaya, Tarik; Ku, Jentung; Hoang, Triem T.; Cheung, Mark L.

    1998-01-01

    The primary focus of this study is to model steady-state performance of a Loop Heat Pipe (LHP). The mathematical model is based on the steady-state energy balance equations at each component of the LHP. The heat exchange between each LHP component and the surrounding is taken into account. Both convection and radiation environments are modeled. The loop operating temperature is calculated as a function of the applied power at a given loop condition. Experimental validation of the model is attempted by using two different LHP designs. The mathematical model is tested at different sink temperatures and at different elevations of the loop. Tbc comparison of the calculations and experimental results showed very good agreement (within 3%). This method proved to be a useful tool in studying steady-state LHP performance characteristics.

  9. Pipeline Processing for VISTA

    Science.gov (United States)

    Lewis, J. R.; Irwin, M.; Bunclark, P.

    2010-12-01

    The VISTA telescope is a 4 metre instrument which has recently been commissioned at Paranal, Chile. Equipped with an infrared camera, 16 2Kx2K Raytheon detectors and a 1.7 square degree field of view, VISTA represents a huge leap in infrared survey capability in the southern hemisphere. Pipeline processing of IR data is far more technically challenging than for optical data. IR detectors are inherently more unstable, while the sky emission is over 100 times brighter than most objects of interest, and varies in a complex spatial and temporal manner. To compensate for this, exposure times are kept short, leading to high nightly data rates. VISTA is expected to generate an average of 250 GB of data per night over the next 5-10 years, which far exceeds the current total data rate of all 8m-class telescopes. In this presentation we discuss the pipelines that have been developed to deal with IR imaging data from VISTA and discuss the primary issues involved in an end-to-end system capable of: robustly removing instrument and night sky signatures; monitoring data quality and system integrity; providing astrometric and photometric calibration; and generating photon noise-limited images and science-ready astronomical catalogues.

  10. Logistics aspects of petroleum pipeline operations

    Directory of Open Access Journals (Sweden)

    W. J. Pienaar

    2010-11-01

    Full Text Available The paper identifies, assesses and describes the logistics aspects of the commercial operation of petroleum pipelines. The nature of petroleum-product supply chains, in which pipelines play a role, is outlined and the types of petroleum pipeline systems are described. An outline is presented of the nature of the logistics activities of petroleum pipeline operations. The reasons for the cost efficiency of petroleum pipeline operations are given. The relative modal service effectiveness of petroleum pipeline transport, based on the most pertinent service performance measures, is offered. The segments in the petroleum-products supply chain where pipelines can play an efficient and effective role are identified.

  11. Hydrocarbons pipeline transportation risk assessment

    Science.gov (United States)

    Zanin, A. V.; Milke, A. A.; Kvasov, I. N.

    2018-04-01

    The pipeline transportation applying risks assessment issue in the arctic conditions is addressed in the paper. Pipeline quality characteristics in the given environment has been assessed. To achieve the stated objective, the pipelines mathematical model was designed and visualized by using the software product SOLIDWORKS. When developing the mathematical model the obtained results made possible to define the pipeline optimal characteristics for designing on the Arctic sea bottom. In the course of conducting the research the pipe avalanche collapse risks were examined, internal longitudinal and circular loads acting on the pipeline were analyzed, as well as the water impact hydrodynamic force was taken into consideration. The conducted calculation can contribute to the pipeline transport further development under the harsh climate conditions of the Russian Federation Arctic shelf territory.

  12. Slurry pipeline design approach

    Energy Technology Data Exchange (ETDEWEB)

    Betinol, Roy; Navarro R, Luis [Brass Chile S.A., Santiago (Chile)

    2009-12-19

    Compared to other engineering technologies, the design of a commercial long distance Slurry Pipeline design is a relatively new engineering concept which gained more recognition in the mid 1960 's. Slurry pipeline was first introduced to reduce cost in transporting coal to power generating units. Since then this technology has caught-up worldwide to transport other minerals such as limestone, copper, zinc and iron. In South America, the use of pipeline is commonly practiced in the transport of Copper (Chile, Peru and Argentina), Iron (Chile and Brazil), Zinc (Peru) and Bauxite (Brazil). As more mining operations expand and new mine facilities are opened, the design of the long distance slurry pipeline will continuously present a commercially viable option. The intent of this paper is to present the design process and discuss any new techniques and approach used today to ensure a better, safer and economical slurry pipeline. (author)

  13. A digital optical phase-locked loop for diode lasers based on field programmable gate array

    Science.gov (United States)

    Xu, Zhouxiang; Zhang, Xian; Huang, Kaikai; Lu, Xuanhui

    2012-09-01

    We have designed and implemented a highly digital optical phase-locked loop (OPLL) for diode lasers in atom interferometry. The three parts of controlling circuit in this OPLL, including phase and frequency detector (PFD), loop filter and proportional integral derivative (PID) controller, are implemented in a single field programmable gate array chip. A structure type compatible with the model MAX9382/MCH12140 is chosen for PFD and pipeline and parallelism technology have been adapted in PID controller. Especially, high speed clock and twisted ring counter have been integrated in the most crucial part, the loop filter. This OPLL has the narrow beat note line width below 1 Hz, residual mean-square phase error of 0.14 rad2 and transition time of 100 μs under 10 MHz frequency step. A main innovation of this design is the completely digitalization of the whole controlling circuit in OPLL for diode lasers.

  14. Unusual occurrences during the whole operation of BN-250 NPP

    International Nuclear Information System (INIS)

    Andropenkov, S.

    2000-01-01

    Unusual occurrences during the whole operation BN-350 NPP. 1. Oil ingress in high pressure receiver for the not reveled reason, 12.05.1994. 2. lncrease of water radioactivity of circulating water supply system due to heat exchanger leak of spent fuel assembly washing out system, 17.09.1993. 3. Lack of passableness of sodium drain header of primary circuit reveled during inspection on scheduled preventative maintenance, 28.11.1996. 4. Destruction of the blow-off line of MCP-6 due to corrosion damage of the pipeline while unit was being operated at rated power, 23.04.1993. 5. Lack of passableness of blow-down pipeline connecting reactor gas cover with gas-type pressurizer while unit was being operated at rated power, 17.11.1994. 6. Sodium ingress in blow-down pipeline of loop-5 intermediate heat exchanger while loop-5 was being fed of sodium during scheduled preventative maintenance, 27.06.1994. 7. Resistance deterioration of electro heating zones of loop-4 due to heat exchanger leak and water ingress in air-pipeline of primary circuit boxes recirculating air system, 02.05.1997. 8. Resistance deterioration of electro heating zones of sodium drain header of secondary circuit was sopped in the water for the extinguishing the fire of blowing ventilation oil-strainer, 23.12.1994. 9. Sodium ingress in gas-type pressurizer through pipeline of primary sodium cleanup system and blow-down pipeline of failed MCP-2 while primary sodium cleanup system was being connected to the primary circuit, 17.08.1976. As a rule, the main reactor systems are scrutinized more carefully than the auxiliary reactor systems and the order actions are existed for eliminating and mitigating of consequences of main reactor system fails. Therefore the auxiliary reactor system fails may impact on the main reactor systems through places of its contact in significant measure. The influence of auxiliary reactor system fails on main reactor systems and its possible consequences for behavior of the main

  15. Logistics aspects of pipeline transport in the supply of petroleum products

    Directory of Open Access Journals (Sweden)

    Wessel Pienaar

    2008-09-01

    activities are involved in the flow of goods between place of origin and place of consumption or application:Demand forecasting, Facility site selection, Procurement,Materials handling, Packaging, Warehouse management, Inventory management,Order processing, Logistics communications, Transport, Reverse logistics. Because cost is incurred without adding value each time goods are handled (activity 4 at a terminal or storage facility, a primary logistics objective is to eliminate handling wherever possible. With the carriage of crude oil and petroleum products by pipeline this objective is fully met. Commodity intake, haulage, and discharge are combined in one process, usually a remote-controlled operation. Pipeline transport is a non-containerised bulk mode of transport thereby obviating the need for packaging (activity 5 and returning empty containers. Pipelines provide a direct and long-term link between these origins and destinations. If necessary a continuous service can be provided with no need for a return trip or a reverse pumping process (activity 11.The elimination of handling, packaging and reverse logistics activities contribute substantially to the high measure of economies of scale that pipeline transport enjoys. The article provides adscription of each of the eleven logistics activities in the context of pipeline transport. Effective logistics service is a prerequisite to help ensure that customers receive the required products at the desired quality and quantity, where and when needed. The most pertinent determinants of logistics service performance aresuitability, accessibility, goods security, transit time, reliability and flexibility. The article offers a discussion of the extent to which pipeline transport conforms to each of these measures of effectiveness.

  16. LNG transport through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Pfund, P; Philipps, A

    1975-01-01

    LNG pipelines could help solve some peakshaving problems if operated in conjunction with other facilities that could use the LNG cold recovered during regasification. In some areas at present, LNG is delivered by tanker and regasified near the terminal for transmission through conventional gas pipelines. In other places, utilities liquefy natural gas for easy storage for later peakshaving use. The only chance to avoid the second expensive liquefaction step would be to convey imported LNG through a suitable designed LNG pipeline. The technical problems involved in LNG pipeline construction have basically been solved in recent years, but those pipelines actually constructed have been only short ones. To be economically justified, long-distance LNG lines require additional credit, which could be obtained by selling the LNG cold recovered during regasification to industrial users located in or near the points of gas consumption. Technical details presented cover the pipe material, stress relief, steel composition, pressure enthalpy, bellows-type expansion joints, and mechanical and thermal insulation.

  17. Countermeasure against thermal fatigue crack of primary loop recirculation pump in BWR

    International Nuclear Information System (INIS)

    Noda, Hiroshi; Narabayashi, Tadashi; Takahashi, Yuuji

    2008-01-01

    The reactor water was fed to the purge water of the mechanical seal on the original design of the primary loop recirculation pump. Because the mechanical seal had a short life due to the cruds in the reactor water, the clean purge water was adopted instead of the reactor water. After this modification, the shallow cracks were found on the surface of the pump shaft and casing cover due to the temperature fluctuation between the cold purge water and the hot pump discharge water. The fundamental mechanism and countermeasure were investigated by scale test, mock-up test and so on. The flow barrier with a heater was contrived through these tests. It has been introduced gradually in operating and constructing PLR pumps after its completion in 1995. The PLR pumps are overhauled around every 10 years in Japan. The first overhaul of the PLR pumps showed no cracks around the pump shaft and casing over after 10 years' operation. This paper presents both its development process and inspection results. (author)

  18. Experimental study on a de-noising system for gas and oil pipelines based on an acoustic leak detection and location method

    International Nuclear Information System (INIS)

    Liu, Cuiwei; Li, Yuxing; Fang, Liping; Xu, Minghai

    2017-01-01

    To protect the pipelines from significant danger, the acoustic leak detection and location method for oil and gas pipelines is studied, and a de-noising system is established to extract leakage characteristics from signals. A test loop for gas and oil is established to carry out experiments. First, according to the measured signals, fitting leakage signals are obtained, and then, the objective signals are constructed by adding noises to the fitting signals. Based on the proposed evaluation indexes, the filtering methods are then applied to process the constructed signals and the de-noising system is established. The established leakage extraction system is validated and then applied to process signals measured in gas pipelines that include a straight pipe, elbow pipe and reducing pipe. The leak detection and location is carried out effectively. Finally, the system is applied to process signals measured in water pipelines. The results demonstrate that the proposed de-noising system is effective at extracting leakage signals from measured signals and that the proposed leak detection and location method has a higher detection sensitivity and localization accuracy. For a pipeline with an inner diameter of 42 mm, the smallest leakage orifice that can be detected is 0.1 mm for gas and water and the largest location error is 0.874% for gas and 0.176% for water. - Highlights: • Three evaluation indexes are proposed: SNR, RMSE and ALPD. • The de-noising system is established in the gas and oil pipelines. • The established system is used for gas pipeline effectively, including interference pipes. • The established de-noising system is used for water pipeline effectively.

  19. Planned and proposed pipeline regulations

    International Nuclear Information System (INIS)

    De Leon, C.

    1992-01-01

    The Research and Special Programs Administration administers the Natural Gas Pipeline Safety Act of 1968 (NGPSA) and the Hazardous Liquid Pipeline Safety Act of 1979 (HLPSA). The RSPA issues and enforces design, construction, operation and maintenance regulations for natural gas pipelines and hazardous liquid pipelines. This paper discusses a number of proposed and pending safety regulations and legislative initiatives currently being considered by the RSPA and the US Congress. Some new regulations have been enacted. The next few years will see a great deal of regulatory activity regarding natural gas and hazardous liquid pipelines, much of it resulting from legislative requirements. The office of Pipeline Safety is currently conducting a study to streamline its operations. This study is analyzing the office's business, social and technical operations with the goal of improving overall efficiency, effectiveness, productivity and job satisfaction to meet the challenges of the future

  20. Effect of oil-pipelines existed in HVTL corridor on the electric field distribution

    Energy Technology Data Exchange (ETDEWEB)

    Ismail, H.M. [College of Technological Studies, Kuwait (Kuwait). Dept. of Electrical Engineering

    2007-07-01

    The overhead transmission of large amounts of electricity over long distances requires high transmission voltages which can generate high electric fields that may have harmful effects on both human and animals. Therefore, corridors or right-of-way are left on both sides along the route of transmission lines. Overhead power transmission lines need strips of land to be designated as rights-of-way. These strips of land can also support other uses such as pipelines, railroads and highways. The primary purpose for minimizing the field effects of high voltage AC lines is to reduce the electric field at ground level. This study investigated the effects of oil-pipelines running parallel to the lines in the rights-of-way corridors on the electric fields generated from high voltage electrical networks in Kuwait. In order to examine the impact of certain design parameters on the electric field distribution near the ground surface, this study varied the oil pipelines diameter, the proximity of the pipeline from the transmission line center and the number of pipelines. The objective was to determine if the amount of land which is required as right-of-way can be reduced. This study also examined the effect of two parallel oil pipelines on the field distribution. Both pipelines were separated by a given distance and ran parallel to the transmission line conductors. The charge simulation method (CSM) was used to simulate and model both the conductors of the transmission lines and the oil-pipelines. Graphs for the electric field distribution profiles at the ground surface, at transmission line conductors' surfaces and at the surfaces of the oil pipelines were presented and evaluated for each scenario. 10 refs., 12 figs.

  1. Chechnya: the pipeline front

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1999-11-01

    This article examines the impact of the Russian campaign against Chechnya on projects for oil and gas pipelines from the new Caspian republics, which are seeking financial support. Topics discussed include the pipeline transport of oil from Azerbaijan through Chechnya to the Black Sea, the use of oil money to finance the war, the push for non-Russian export routes, the financing of pipelines, the impact of the war on the supply of Russian and Turkmenistan gas to Turkey, the proposed construction of the Trans Caspian pipeline, the weakening of trust between Russia and its neighbours, and the potential for trans Caucasus republics to look to western backers due to the instability of the North Caucasus. (UK)

  2. Pipelines in power plants

    International Nuclear Information System (INIS)

    Oude-Hengel, H.H.

    1978-01-01

    Since the end of the Sixties, steam-transporting pipelines are given great attention, as pipeline components often fail, partially even long before their designed operation time is over. Thus, experts must increasingly deal with questions of pipelines and their components. Design and calculation, production and operation of pipelines are included in the discussion. Within the frame of this discussion, planners, producers, operators, and technical surveillance personnel must be able to offer a homogenous 'plan for assuring the quality of pipelines' in fossil and nuclear power plants. This book tries to make a contribution to this topic. 'Quality assuring' means efforts made for meeting the demands of quality (reliability). The book does not intend to complete with well-known manuals, as for as a complete covering of the topic is concerned. A substantial part of its sections serves to show how quality assurance of pipelines can be at least partially obtained by surveillance measures beginning with the planning, covering the production, and finally accompanying the operation. There is hardly need to mention that the sort of planning, production, and operation has an important influence on the quality. This is why another part of the sections contain process aspects from the view of the planners, producers, and operators. (orig.) [de

  3. In-pile loop experiments in water chemistry and corrosion

    International Nuclear Information System (INIS)

    Kysela, J.; Jindrich, K.; Masarik, V.; Fric, Z.; Chotivka, V.; Hamerska, H.; Vsolak, R.; Erben, O.

    1986-08-01

    Methods and techniques used were as follows: (a) Method of polarizing resistance for remote monitoring of instantaneous rate of uniform corrosion. (b) Out-of-pile loop at the temperature 350 degC, pressure 19 MPa, circulation 20 kgs/h, testing time 1000 h. (c) High temperature electromagnetic filter with classical solenoid and ball matrix for high pressure filtration tests. (d) High pressure and high temperature in-pile water loop with coolant flow rate 10 000 kgs/h, neutron flux in active channel 7x10 13 n/cm 2 .s, 16 MPa, 330 degC. (e) Evaluation of experimental results by chemical and radiochemical analysis of coolant, corrosion products and corrosion layer on surface. The results of measurements carried out in loop facilities can be summarized into the following conclusions: (a) In-pile and out-of-pile loops are suitable means of investigating corrosion processes and mass transport in the nuclear power plant primary circuit. (b) In studying transport phenomena in the loop, it is necessary to consider the differences in geometry of the loop and the primary circuit, mainly the ratio of irradiated and non-irradiated surfaces and volumes. (c) In the experimental facility simulating the WWER-type nuclear power plant primary circuit, solid suspended particles of a chemical composition corresponding most frequently to magnetite or nickel ferrite, though with non-stoichiometric composition Me x 2+ Fe 3-x 3+ O 4 , were found. (d) Continuous filtration of water by means of an electromagnetic filter removing large particles of corrosion products leads to a decrease in radioactivity of the outer epitactic layer only. The effect of filtration on the inner topotactic layer is negligible

  4. Fishing intensity around the BBL pipeline

    NARCIS (Netherlands)

    Hintzen, Niels

    2016-01-01

    Wageningen Marine Research was requested by ACRB B.V. to investigate the fishing activities around the BBL pipeline. This gas pipeline crosses the southern North Sea from Balgzand (near Den Helder) in the Netherlands to Bacton in the UK (230km). This pipeline is abbreviated as the BBL pipeline. Part

  5. ASN takes position in the in-service follow-up programs of primary and secondary loops of EdF's nuclear power plants

    International Nuclear Information System (INIS)

    2002-01-01

    This decision from the French authority of nuclear safety (ASN) aims at fixing the conditions to be respected by Electricite de France (EdF) during its in-service follow-up programs for the monitoring and preventive maintenance of the primary and secondary cooling loops of EdF's PWR reactors. The components and the particular points to be controlled are listed in appendixes. (J.S.)

  6. Diagnosing in building main pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Telegin, L.G.; Gorelov, A.S.; Kurepin, B.N.; Orekhov, V.I.; Vasil' yev, G.G.; Yakovlev, Ye. I.

    1984-01-01

    General principles are examined for technical diagnosis in building main pipelines. A technique is presented for diagnosis during construction, as well as diagnosis of the technical state of the pipeline-construction machines and mechanisms. The survey materials could be used to set up construction of main pipelines.

  7. Pipeline integrity handbook risk management and evaluation

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Based on over 40 years of experience in the field, Ramesh Singh goes beyond corrosion control, providing techniques for addressing present and future integrity issues. Pipeline Integrity Handbook provides pipeline engineers with the tools to evaluate and inspect pipelines, safeguard the life cycle of their pipeline asset and ensure that they are optimizing delivery and capability. Presented in easy-to-use, step-by-step order, Pipeline Integrity Handbook is a quick reference for day-to-day use in identifying key pipeline degradation mechanisms and threats to pipeline integrity. The book begins

  8. Internal corrosion control of northern pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Papavinasam, S.

    2005-02-01

    The general causes of internal corrosion in pipelines were discussed along with the methods to control them. Efficient methods are needed to determine chemical efficiency for mitigating internal corrosion in transmission pipelines, particularly those used in environmentally sensitive regions in the Arctic where harsh environmental conditions prevail. According to the Office of Pipeline Safety, 15 per cent of pipeline failures in the United States from 1994 to 2000 were caused by internal corrosion. Since pipelines in the United States are slightly older than Canadian pipelines, internal corrosion is a significant issue from a Canadian perspective. There are 306,618 km of energy-related pipelines in western Canada. Between April 2001 and March 2002 there were 808 failures, of which 425 failures resulted from internal corrosion. The approach to control internal corrosion comprises of dehydrating the gases at production facilities; controlling the quality of corrosive gases such as carbon dioxide and hydrogen sulphide; and, using internal coatings. The approaches to control internal corrosion are appropriate, when supplemented by adequate integrity management program to ensure that corrosive liquids do not collect, over the operational lifetime of the pipelines, at localized areas. It was suggested that modeling of pipeline operations may need improvement. This paper described the causes, prediction and control of internal pitting corrosion. It was concluded that carbon steel equipment can continue to be used reliably and safely as pipeline materials for northern pipelines if the causes that lead to internal corrosion are scientifically and accurately predicted, and if corrosion inhibitors are properly evaluated and applied. 5 figs.

  9. Trouble in the pipeline?

    Energy Technology Data Exchange (ETDEWEB)

    Snieckus, Darius

    2002-10-01

    The author provides a commentary on the political, economic, environmental and social problems facing the proposed 3 billion US dollars Baku-Ceyhan-Tbilisi export pipeline. The 1760 km long pipeline has been designed to carry 1 million b/d of crude oil from the Caspian Sea to Turkey's Mediterranean coast. The pipeline is being constructed by a BP-led consortium made up of Socar, Statoil, Unocal, TPAO, Eni, Itochu, Amerada Hess, TotalFinaElf and BP. (UK)

  10. Canadian pipeline transportation system : transportation assessment

    International Nuclear Information System (INIS)

    2009-07-01

    In addition to regulating the construction and operation of 70,000 km of oil and natural gas pipelines in Canada, the National Energy Board (NEB) regulates the trade of natural gas, oil and natural gas liquids. This report provided an assessment of the Canadian hydrocarbon transportation system in relation to its ability to provide a robust energy infrastructure. Data was collected from NEB-regulated pipeline companies and a range of publicly available sources to determine if adequate pipeline capacity is in place to transport products to consumers. The NEB also used throughput and capacity information received from pipeline operators as well as members of the investment community. The study examined price differentials compared with firm service tolls for transportation paths, as well as capacity utilization on pipelines and the degree of apportionment on major oil pipelines. This review indicated that in general, the Canadian pipeline transportation system continues to work effectively, with adequate pipeline capacity in place to move products to consumers who need them. 9 tabs., 30 figs., 3 appendices.

  11. 77 FR 6857 - Pipeline Safety: Notice of Public Meetings on Improving Pipeline Leak Detection System...

    Science.gov (United States)

    2012-02-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... installed to lessen the volume of natural gas and hazardous liquid released during catastrophic pipeline... p.m. Panel 3: Considerations for Natural Gas Pipeline Leak Detection Systems 3:30 p.m. Break 3:45 p...

  12. Neutron backscattered application in investigation for Pipeline Intelligent Gauge (PIG) tracking in RAYMINTEX matrix pipeline

    International Nuclear Information System (INIS)

    Mohd Fakarudin Badul Rahman; Ismail Mustapha; Nor Paiza Mohd Hasan; Pairu Ibrahim; Airwan Affandi Mahmood; Mior Ahmad Khusaini Adnan; Najib Mohammed Zakey

    2012-01-01

    The Radiation Vulcanized Natural Rubber Latex (RVNRL) process plants such RAYMINTEX, pipelines are used extensively to transfer a latex product from storage vessel and being irradiated to produce a high quality of latex. A hydraulically activated Pipeline Intelligent Gauge (PIG) was held back against the latex flow. Consequently, the stuck PIG in pipeline was subjected to interrupt plant operation. The investigation was carried out using the neutron backscattered technique scanner to track the stuck PIG in pipeline of RVNRL plant. The 50 mCi Americium Beryllium (AmBe 241 ) fast neutron emitter source in the range 0.5-11 MeV has been used and thermal neutrons in the 30 eV- 0.5 MeV was detected using Helium-3 (He 3 ) detector. It is observed that there is unambiguous relationship between vapour and RVNRL consequence of diverse hydrogen concentration in pipeline. Thus, neutron backscattered technique was capable to determine the location of stuck PIG in a RVNRL pipeline. (author)

  13. A digital optical phase-locked loop for diode lasers based on field programmable gate array

    Energy Technology Data Exchange (ETDEWEB)

    Xu Zhouxiang; Zhang Xian; Huang Kaikai; Lu Xuanhui [Physics Department, Zhejiang University, Hangzhou, 310027 (China)

    2012-09-15

    We have designed and implemented a highly digital optical phase-locked loop (OPLL) for diode lasers in atom interferometry. The three parts of controlling circuit in this OPLL, including phase and frequency detector (PFD), loop filter and proportional integral derivative (PID) controller, are implemented in a single field programmable gate array chip. A structure type compatible with the model MAX9382/MCH12140 is chosen for PFD and pipeline and parallelism technology have been adapted in PID controller. Especially, high speed clock and twisted ring counter have been integrated in the most crucial part, the loop filter. This OPLL has the narrow beat note line width below 1 Hz, residual mean-square phase error of 0.14 rad{sup 2} and transition time of 100 {mu}s under 10 MHz frequency step. A main innovation of this design is the completely digitalization of the whole controlling circuit in OPLL for diode lasers.

  14. 75 FR 4134 - Pipeline Safety: Leak Detection on Hazardous Liquid Pipelines

    Science.gov (United States)

    2010-01-26

    ... safety study on pipeline Supervisory Control and Data Acquisition (SCADA) systems (NTSB/SS-05/02). The... indications of a leak on the SCADA interface was the impetus for this study. The NTSB examined 13 hazardous... pipelines, the line balance technique for leak detection can often be performed with manual calculations...

  15. Contemporary methods of emergency repair works on transit pipelines. Repair works on in-service pipelines

    International Nuclear Information System (INIS)

    Olma, T.; Winckowski, J.

    2007-01-01

    The paper presents modern methods and relevant technologies of pipeline failure repairs, basing on TD Williamson technique for hermetic plugging of gas pipelines without interrupting service. Rules for management of emergency situations on the Polish Section of Yamal - Europe Transit Gas Pipeline are being discussed as well. (author)

  16. Northern pipelines : backgrounder

    International Nuclear Information System (INIS)

    2002-04-01

    Most analysts agree that demand for natural gas in North America will continue to grow. Favourable market conditions created by rising demand and declining production have sparked renewed interest in northern natural gas development. The 2002 Annual Energy Outlook forecasted U.S. consumption to increase at an annual average rate of 2 per cent from 22.8 trillion cubic feet to 33.8 TCF by 2020, mostly due to rapid growth in demand for electric power generation. Natural gas prices are also expected to increase at an annual average rate of 1.6 per cent, reaching $3.26 per thousand cubic feet in 2020. There are currently 3 proposals for pipelines to move northern gas to US markets. They include a stand-alone Mackenzie Delta Project, the Alaska Highway Pipeline Project, and an offshore route that would combine Alaskan and Canadian gas in a pipeline across the floor of the Beaufort Sea. Current market conditions and demand suggest that the projects are not mutually exclusive, but complimentary. The factors that differentiate northern pipeline proposals are reserves, preparedness for market, costs, engineering, and environmental differences. Canada has affirmed its role to provide the regulatory and fiscal certainty needed by industry to make investment decisions. The Government of the Yukon does not believe that the Alaska Highway Project will shut in Mackenzie Delta gas, but will instead pave the way for development of a new northern natural gas industry. The Alaska Highway Pipeline Project will bring significant benefits for the Yukon, the Northwest Territories and the rest of Canada. Unresolved land claims are one of the challenges that has to be addressed for both Yukon and the Northwest Territories, as the proposed Alaska Highway Pipeline will travel through traditional territories of several Yukon first Nations. 1 tab., 4 figs

  17. From closed-loop to sustainable suplly chains: the WEEE case

    NARCIS (Netherlands)

    Quariguasi Frota Neto, J.; Walther, G.; Bloemhof, J.M.; Nunen, van J.A.E.E.; Spengler, T.

    2010-01-01

    The primary objective of closed-loop supply chains (CLSC) is to improve the maximum economic benefit from end-of-use products. Nevertheless, the literature within this stream of research advocates that closing the loop also helps to mitigate the undesirable environmental footprint of supply chains.

  18. Control Strategies for Islanded Microgrid using Enhanced Hierarchical Control Structure with Multiple Current-Loop Damping Schemes

    DEFF Research Database (Denmark)

    Han, Yang; Shen, Pan; Zhao, Xin

    2017-01-01

    In this paper, the modeling, controller design, and stability analysis of the islanded microgrid (MG) using enhanced hierarchical control structure with multiple current loop damping schemes is proposed. The islanded MG is consisted of the parallel-connected voltage source inverters using LCL...... output filters, and the proposed control structure includes: the primary control with additional phase-shift loop, the secondary control for voltage amplitude and frequency restoration, the virtual impedance loops which contains virtual positive- and negative-sequence impedance loops at fundamental...... frequency, and virtual variable harmonic impedance loop at harmonic frequencies, and the inner voltage and current loop controllers. A small-signal model for the primary and secondary controls with additional phase-shift loop is presented, which shows an over-damped feature from eigenvalue analysis...

  19. Crude oil pipeline expansion summary

    International Nuclear Information System (INIS)

    2005-02-01

    The Canadian Association of Petroleum Producers has been working with producers to address issues associated with the development of new pipeline capacity from western Canada. This document presents an assessment of the need for additional oil pipeline capacity given the changing mix of crude oil types and forecasted supply growth. It is of particular interest to crude oil producers and contributes to current available information for market participants. While detailed, the underlying analysis does not account for all the factors that may come into play when individual market participants make choices about which expansions they may support. The key focus is on the importance of timely expansion. It was emphasized that if pipeline expansions lags the crude supply growth, then the consequences would be both significant and unacceptable. Obstacles to timely expansion are also discussed. The report reviews the production and supply forecasts, the existing crude oil pipeline infrastructure, opportunities for new market development, requirements for new pipeline capacity and tolling options for pipeline development. tabs., figs., 1 appendix

  20. 77 FR 45417 - Pipeline Safety: Inspection and Protection of Pipeline Facilities After Railway Accidents

    Science.gov (United States)

    2012-07-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Accidents AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. [[Page 45418

  1. Canadian pipeline contractors in holding pattern

    Energy Technology Data Exchange (ETDEWEB)

    Caron, G [Pe Ben Pipelines Ltd.; Osadchuk, V; Sharp, M; Stabback, J G

    1979-05-21

    A discussion of papers presented at a Pipe Line Contractors Association of Canada convention includes comments by G. Caron (Pe Ben Pipelines Ltd.) on the continued slack in big-inch pipeline construction into 1980 owing mainly to delayed U.S. and Canadian decisions on outstanding Alaska Highway gas pipeline issues and associated gas export bids and on the use of automatic welding for expeditious construction of the northern sections of the Alaska Highway pipeline; by V. Osadchuk (Majestic Wiley Contract. Ltd.) on the liquidation of surplus construction equipment because of these delays; by M. Sharp (Can. North. Pipeline Agency) on the need for close U.S. and Canadian governmental and industrial cooperation to permit an early 1980 start for construction of the prebuild sections of the Alaska pipeline; and by J. G. Stabback (Can. Natl. Energy Board) on the Alaska oil pipeline applications by Foothills Pipe Lines Ltd., Trans Mountain Pipe Line Co. Ltd., and Kitimat Pipe Line Ltd.

  2. Study on the production mechanism of Co-60 in the primary loop of HTR-10

    International Nuclear Information System (INIS)

    Wang Shouang; Xie Feng; Li Hong; Cao Jianzhu; Li Fu; Wei Liqiang

    2015-01-01

    Co-60 is an activated metallic erosion product, which is very important for waste management and decommissioning work of pressurized water reactor (PWR) power plants. Recent measurement on the samples from the primary loop of HTR-10 indicates the existence of Co-60. In current paper, the preliminary experimental results in HTR-10 will be introduced, and the production mechanism of Co-60 in the pebble bed high temperature gas-cooled reactors will be summarized and compared with that in PWRs and Germany High Temperature Nuclear Reactor (AVR). The further experiments with decomposing the post-irradiation graphite spheres of HTR-10 are put forward, which will promote the further study to testify the production sources of Co-60 and be of great significance in the waste minimization and the decommissioning work of HTR-10. (author)

  3. 76 FR 28326 - Pipeline Safety: National Pipeline Mapping System Data Submissions and Submission Dates for Gas...

    Science.gov (United States)

    2011-05-17

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR 191... Reports AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Issuance of... Pipeline and Hazardous Materials Safety Administration (PHMSA) published a final rule on November 26, 2010...

  4. Measures for security and supervision of pipelines; Massnahmen zur Pipeline-Sicherheit und -Ueberwachung

    Energy Technology Data Exchange (ETDEWEB)

    Horlacher, Hans-Burkhard [TU Dresden (Germany). Inst. fuer Wasserbau und Technische Hydromechanik; Giesecke, Juergen [Stuttgart Univ. (Germany). Inst. fuer Wasserbau

    2010-07-01

    In a previous publication, the two authors dealt with the hydraulic problems as regards mineral oil pipelines. The present report describes the measures mainly used to guarantee the safety of such pipelines. (orig.)

  5. Pipeline integrity evaluation of oil pipelines using free-swimming acoustic technology

    Energy Technology Data Exchange (ETDEWEB)

    Ariaratnam, Samuel T. [Arizona State University, Tempe, Arizona (United States); Chandrasekaran, Muthu [Pure Technologies Limited, Calgary, AB (Canada)

    2010-07-01

    In the United States, the Pipeline and Hazardous Materials Safety Administration (PHMSA) funded a joint academy-industry research project, which developed and refined a free-swimming tool called SmartBall. The tool swims through the pipeline and gives results at a much lower cost than current leak detection methods, and it can detect leaks as small as 0.03 gpm of oil. GPS-synchronized above-ground loggers capture acoustic signals and record the passage of the tool through the pipeline. The tool is spherical and smaller than the pipe, through which it rolls silently; it can overcome obstacles that could otherwise make a pipeline unpiggable. SmartBall uses the great potential of acoustic detection, because when a pressurized product leaks from a pipe, it produces a distinctive acoustic signal that travels through the product; at the same time, it overcomes the problem caused by the very limited range of this signal. This technology can prevent enormous economic consequences such as a 50,000-gallon gasoline spill that happened in 2003 between Tucson and Phoenix.

  6. Morbidity of temporary loop ileostomies

    NARCIS (Netherlands)

    Bakx, R.; Busch, O. R. C.; Bemelman, W. A.; Veldink, G. J.; Slors, J. F. M.; van Lanschot, J. J. B.

    2004-01-01

    Background/Aims: A temporary loop ileostomy is constructed to protect a distal colonic anastomosis. Closure is usually performed not earlier than 8 - 12 weeks after the primary operation. During this period, stoma-related complications can occur and enhance the adverse effect on quality of life. The

  7. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_vectors_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the lines of the pipeline in the GOM. All pipelines existing in the databases...

  8. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_points_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the points of the pipeline in the GOM. All pipelines existing in the databases...

  9. Northern pipelines : challenges and needs

    Energy Technology Data Exchange (ETDEWEB)

    Dean, D.; Brownie, D. [ProLog Canada Inc., Calgary, AB (Canada); Fafara, R. [TransCanada PipeLines Ltd., Calgary, AB (Canada)

    2007-07-01

    Working Group 10 presented experiences acquired from the operation of pipeline systems in a northern environment. There are currently 3 pipelines operating north of 60, notably the Shiha gas pipeline near Fort Liard, the Ikhil gas pipeline in Inuvik and the Norman Wells oil pipeline. Each has its unique commissioning, operating and maintenance challenges, as well as specific training and logistical support requirements for the use of in-line inspection tools and other forms of integrity assessment. The effectiveness of cathodic protection systems in a permafrost northern environment was also discussed. It was noted that the delay of the Mackenzie Gas Pipeline Project by two to three years due to joint regulatory review may lead to resource constraints for the project as well as competition for already scarce human resources. The issue of a potential timing conflict with the Alaskan Pipeline Project was also addressed as well as land use issues for routing of supply roads. Integrity monitoring and assessment issues were outlined with reference to pipe soil interaction monitoring in discontinuous permafrost; south facing denuded slope stability; base lining projects; and reclamation issues. It was noted that automatic welding and inspection will increase productivity, while reducing the need for manual labour. In response to anticipated training needs, companies are planning to involve and train Aboriginal labour and will provide camp living conditions that will attract labour. tabs., figs.

  10. Water level detection pipeline

    International Nuclear Information System (INIS)

    Koshikawa, Yukinobu; Imanishi, Masatoshi; Niizato, Masaru; Takagi, Masahiro

    1998-01-01

    In the present invention, water levels of a feedwater heater and a drain tank in a nuclear power plant are detected at high accuracy. Detection pipeline headers connected to the upper and lower portions of a feedwater heater or a drain tank are connected with each other. The connection line is branched at appropriate two positions and an upper detection pipeline and a lower detection pipeline are connected thereto, and a gauge entrance valve is disposed to each of the detection pipelines. A diaphragm of a pressure difference generator is connected to a flange formed to the end portion. When detecting the change of water level in the feedwater heater or the drain tank as a change of pressure difference, gauge entrance valves on the exit side of the upper and lower detection pipelines are connected by a connection pipe. The gauge entrance valve is closed, a tube is connected to the lower detection pipe to inject water to the diaphragm of the pressure difference generator passing through the connection pipe thereby enabling to calibrate the pressure difference generator. The accuracy of the calibration of instruments is improved and workability thereof upon flange maintenance is also improved. (I.S.)

  11. LoopIng: a template-based tool for predicting the structure of protein loops.

    KAUST Repository

    Messih, Mario Abdel

    2015-08-06

    Predicting the structure of protein loops is very challenging, mainly because they are not necessarily subject to strong evolutionary pressure. This implies that, unlike the rest of the protein, standard homology modeling techniques are not very effective in modeling their structure. However, loops are often involved in protein function, hence inferring their structure is important for predicting protein structure as well as function.We describe a method, LoopIng, based on the Random Forest automated learning technique, which, given a target loop, selects a structural template for it from a database of loop candidates. Compared to the most recently available methods, LoopIng is able to achieve similar accuracy for short loops (4-10 residues) and significant enhancements for long loops (11-20 residues). The quality of the predictions is robust to errors that unavoidably affect the stem regions when these are modeled. The method returns a confidence score for the predicted template loops and has the advantage of being very fast (on average: 1 min/loop).www.biocomputing.it/loopinganna.tramontano@uniroma1.itSupplementary data are available at Bioinformatics online.

  12. Oil pipeline valve automation for spill reduction

    Energy Technology Data Exchange (ETDEWEB)

    Mohitpour, Mo; Trefanenko, Bill [Enbridge Technology Inc, Calgary (Canada); Tolmasquim, Sueli Tiomno; Kossatz, Helmut [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Liquid pipeline codes generally stipulate placement of block valves along liquid transmission pipelines such as on each side of major river crossings where environmental hazards could cause or are foreseen to potentially cause serious consequences. Codes, however, do not stipulate any requirement for block valve spacing for low vapour pressure petroleum transportation, nor for remote pipeline valve operations to reduce spills. A review of pipeline codes for valve requirement and spill limitation in high consequence areas is thus presented along with a criteria for an acceptable spill volume that could be caused by pipeline leak/full rupture. A technique for deciding economically and technically effective pipeline block valve automation for remote operation to reduce oil spilled and control of hazards is also provided. In this review, industry practice is highlighted and application of the criteria for maximum permissible oil spill and the technique for deciding valve automation thus developed, as applied to ORSUB pipeline is presented. ORSUB is one of the three initially selected pipelines that have been studied. These pipelines represent about 14% of the total length of petroleum transmission lines operated by PETROBRAS Transporte S.A. (TRANSPETRO) in Brazil. Based on the implementation of valve motorization on these three pipeline, motorization of block valves for remote operation on the remaining pipelines is intended, depending on the success of these implementations, on historical records of failure and appropriate ranking. (author)

  13. Stabilité des pipelines non ensouillés. Etude bibliographique Stability of Unburied Pipelines. Bibliographic Study

    OpenAIRE

    Alliot J. M.

    2006-01-01

    The integrity of an unburied subsea pipeline depends to a very large extent on its stability on the seabed along its entire length. Hence the determination of this stability is of great importance in the engineering design of pipelines. This article proposes to examine the principal problems raised by the stability of unburied pipelines in the field of soil mechanics. These problems mainly concern the reactions of the soil to pipelines and their assessment, i. e. the forces of soil resistance...

  14. Conformal correlation functions in the Brownian loop soup

    Science.gov (United States)

    Camia, Federico; Gandolfi, Alberto; Kleban, Matthew

    2016-01-01

    We define and study a set of operators that compute statistical properties of the Brownian loop soup, a conformally invariant gas of random Brownian loops (Brownian paths constrained to begin and end at the same point) in two dimensions. We prove that the correlation functions of these operators have many of the properties of conformal primaries in a conformal field theory, and compute their conformal dimension. The dimensions are real and positive, but have the novel feature that they vary continuously as a periodic function of a real parameter. We comment on the relation of the Brownian loop soup to the free field, and use this relation to establish that the central charge of the loop soup is twice its intensity.

  15. Conformal correlation functions in the Brownian loop soup

    Energy Technology Data Exchange (ETDEWEB)

    Camia, Federico, E-mail: federico.camia@nyu.edu [New York University Abu Dhabi (United Arab Emirates); VU University, Amsterdam (Netherlands); Gandolfi, Alberto, E-mail: albertogandolfi@nyu.edu [New York University Abu Dhabi (United Arab Emirates); Università di Firenze (Italy); Kleban, Matthew, E-mail: kleban@nyu.edu [New York University Abu Dhabi (United Arab Emirates); Center for Cosmology and Particle Physics, Department of Physics, New York University (United States)

    2016-01-15

    We define and study a set of operators that compute statistical properties of the Brownian loop soup, a conformally invariant gas of random Brownian loops (Brownian paths constrained to begin and end at the same point) in two dimensions. We prove that the correlation functions of these operators have many of the properties of conformal primaries in a conformal field theory, and compute their conformal dimension. The dimensions are real and positive, but have the novel feature that they vary continuously as a periodic function of a real parameter. We comment on the relation of the Brownian loop soup to the free field, and use this relation to establish that the central charge of the loop soup is twice its intensity.

  16. Conformal correlation functions in the Brownian loop soup

    Directory of Open Access Journals (Sweden)

    Federico Camia

    2016-01-01

    Full Text Available We define and study a set of operators that compute statistical properties of the Brownian loop soup, a conformally invariant gas of random Brownian loops (Brownian paths constrained to begin and end at the same point in two dimensions. We prove that the correlation functions of these operators have many of the properties of conformal primaries in a conformal field theory, and compute their conformal dimension. The dimensions are real and positive, but have the novel feature that they vary continuously as a periodic function of a real parameter. We comment on the relation of the Brownian loop soup to the free field, and use this relation to establish that the central charge of the loop soup is twice its intensity.

  17. Comparing Existing Pipeline Networks with the Potential Scale of Future U.S. CO2 Pipeline Networks

    Energy Technology Data Exchange (ETDEWEB)

    Dooley, James J.; Dahowski, Robert T.; Davidson, Casie L.

    2008-02-29

    There is growing interest regarding the potential size of a future U.S. dedicated CO2 pipeline infrastructure if carbon dioxide capture and storage (CCS) technologies are commercially deployed on a large scale. In trying to understand the potential scale of a future national CO2 pipeline network, comparisons are often made to the existing pipeline networks used to deliver natural gas and liquid hydrocarbons to markets within the U.S. This paper assesses the potential scale of the CO2 pipeline system needed under two hypothetical climate policies and compares this to the extant U.S. pipeline infrastructures used to deliver CO2 for enhanced oil recovery (EOR), and to move natural gas and liquid hydrocarbons from areas of production and importation to markets. The data presented here suggest that the need to increase the size of the existing dedicated CO2 pipeline system should not be seen as a significant obstacle for the commercial deployment of CCS technologies.

  18. Generating pipeline networks for corrosion assessment

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson, J. [Cimarron Engineering Ltd., Calgary, AB (Canada)

    2008-07-01

    Production characteristics and gas-fluid compositions of fluids must be known in order to assess pipelines for internal corrosion risk. In this study, a gathering system pipeline network was built in order to determine corrosion risk for gathering system pipelines. Connections were established between feeder and collector lines in order measure upstream production and the weighted average of the upstream composition of each pipeline in the system. A Norsok M-506 carbon dioxide (CO{sub 2}) corrosion rate model was used to calculate corrosion rates. A spreadsheet was then used to tabulate the obtained data. The analysis used straight lines drawn between the 'from' and 'to' legal sub-division (LSD) endpoints in order to represent pipelines on an Alberta township system (ATS) and identify connections between pipelines. Well connections were established based on matching surface hole location and 'from' LSDs. Well production, composition, pressure, and temperature data were sourced and recorded as well attributes. XSL hierarchical computations were used to determine the production and composition properties of the commingled inflows. It was concluded that the corrosion assessment process can identify locations within the pipeline network where potential deadlegs branched off from flowing pipelines. 4 refs., 2 tabs., 2 figs.

  19. Calculation of NPP pipeline seismic stability

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Ambriashvili, Yu.K.; Kaliberda, I.V.

    1982-01-01

    A simplified design procedure of seismic pipeline stability of NPP at WWER reactor is described. The simplified design procedure envisages during the selection and arrangement of pipeline saddle and hydraulic shock absorbers use of method of introduction of resilient mountings of very high rigidity into the calculated scheme of the pipeline and performance of calculations with step-by-step method. It is concluded that the application of the design procedure considered permits to determine strains due to seismic loads, to analyze stressed state in pipeline elements and supporting power of pipe-line saddle with provision for seismic loads to plan measures on seismic protection

  20. Slurry pipeline technology: an overview

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Jay P. [Pipeline Systems Incorporated (PSI), Belo Horizonte, MG (Brazil); Lima, Rafael; Pinto, Daniel; Vidal, Alisson [Ausenco do Brasil Engenharia Ltda., Nova Lima, MG (Brazil). PSI Div.

    2009-12-19

    Slurry pipelines represent an economical and environmentally friendly transportation means for many solid materials. This paper provides an over-view of the technology, its evolution and current Brazilian activity. Mineral resources are increasingly moving farther away from ports, processing plants and end use points, and slurry pipelines are an important mode of solids transport. Application guidelines are discussed. State-of-the-Art technical solutions such as pipeline system simulation, pipe materials, pumps, valves, automation, telecommunications, and construction techniques that have made the technology successful are presented. A discussion of where long distant slurry pipelines fit in a picture that also includes thickened and paste materials pipe lining is included. (author)

  1. Deposition and incorporation of corrosion product to primary coolant suppressing method

    International Nuclear Information System (INIS)

    Tsuzuki, Yasuo; Hasegawa, Naoyoshi; Fujioka, Tsunaaki.

    1992-01-01

    In a PWR type nuclear power plant, the concentration of dissolved nitrogen in primary coolants is increased by controlling the nitrogen partial pressure in a volume controlling tank gas phase portion or addition of water in a primary system water supply tank containing dissolved nitrogen to a primary system. Then ammonium is formed by a reaction with hydrogen dissolved in the primary coolants in the field of radiation rays, to control the concentration of ammonium in the coolants within a range from 0.5 to 3.5 ppm, and operate the power plant. As a result, deposition and incorporation of corrosion products to the structural materials of the primary system equipments during plant operation (pH 6.8 to 8.0) are suppressed. In other words, deposition of particulate corrosion products on the surface of fuel cladding tubes and the inner surface of pipelines in the primary system main equipments is prevented and incorporation of ionic radioactive corrosion products to the oxide membranes on the inner surface of the pipelines of the primary system main equipments is suppressed, to greatly reduce the radiation dose rate of the primary system pipelines. Thus, operator's radiation exposure can be decreased upon shut down of the plant. (N.H.)

  2. Lay Pipeline Abandonment Head during Some

    African Journals Online (AJOL)

    2016-12-01

    Dec 1, 2016 ... is very cruel to the structural integrity of the pipeline structure after ... and properties may be jeopardized should the pipeline structure be used for oil or gas transport when such ... pipelines under bending may alter the material.

  3. 78 FR 53190 - Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on...

    Science.gov (United States)

    2013-08-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0185] Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on Leak Repair Clamps Due to Defective Seal AGENCY: Pipeline and Hazardous Materials Safety...

  4. Space Maintenance with an Innovative "Tube and Loop" Space Maintainer (Nikhil Appliance).

    Science.gov (United States)

    Srivastava, Nikhil; Grover, Jyotika; Panthri, Prerna

    2016-01-01

    Despite the best efforts in prevention, premature loss of primary teeth continues to be a common problem in pediatric dentistry, resulting in disruption of arch integrity and adversely affecting the proper alignment of permanent successors. Space maintainers (SMs) are special appliances used for maintaining space created due to premature loss of primary teeth. Band and loop SM is mostly indicated for the premature loss of single primary molar, but this appliance has a number of limitations both for operators and for patients. Presented in this article is an innovative "Tube and Loop" SM (Nikhil appliance) which offers several advantages over the conventional band and loop SM. It is not only easy and quick to fabricate but can also be completed in a single sitting and cumbersome steps like impression making and laboratory procedures namely soldering are eliminated. How to cite this article: Srivastava N, Grover J, Panthri P. Space Maintenance with an Innovative "Tube and Loop" Space Maintainer (Nikhil Appliance). Int J Clin Pediatr Dent 2016;9(1):86-89.

  5. U.S. interstate pipelines ran more efficiently in 1994

    International Nuclear Information System (INIS)

    True, W.R.

    1995-01-01

    Regulated US interstate pipelines began 1995 under the momentum of impressive efficiency improvements in 1994. Annual reports filed with the US Federal Energy Regulatory Commission (FERC) show that both natural-gas and petroleum liquids pipeline companies increased their net incomes last year despite declining operating revenues. This article discusses trends in the pipeline industry and gives data on the following: pipeline revenues, incomes--1994; current pipeline costs; pipeline costs--estimated vs. actual; current compressor construction costs; compressor costs--estimated vs. actual; US interstate mileage; investment in liquids pipelines; 10-years of land construction costs; top 10 interstate liquids pipelines; top 10 interstate gas pipelines; liquids pipeline companies; and gas pipeline companies

  6. Current pipelines for neglected diseases.

    Science.gov (United States)

    di Procolo, Paolo; Jommi, Claudio

    2014-09-01

    This paper scrutinises pipelines for Neglected Diseases (NDs), through freely accessible and at-least-weekly updated trials databases. It updates to 2012 data provided by recent publications, and integrates these analyses with information on location of trials coordinators and patients recruitment status. Additionally, it provides (i) disease-specific information to better understand the rational of investments in NDs, (ii) yearly data, to understand the investment trends. The search identified 650 clinical studies. Leishmaniasis, Arbovirus infection, and Dengue are the top three diseases by number of clinical studies. Disease diffusion risk seems to be the most important driver of the clinical trials target choice, whereas the role played by disease prevalence and unmet need is controversial. Number of trials is stable between 2005 and 2010, with an increase in the last two years. Patient recruitment was completed for most studies (57.6%), and Phases II and III account for 35% and 28% of trials, respectively. The primary purpose of clinical investigations is prevention (49.3%), especially for infectious diseases with mosquitoes and sand flies as the vector, and treatment (43.2%), which is the primary target for parasitic diseases Research centres and public organisations are the most important clinical studies sponsors (58.9%), followed by the pharmaceutical industry (24.1%), foundations and non-governmental organisations (9.3%). Many coordinator centres are located in less affluent countries (43.7%), whereas OECD countries and BRICS account for 34.7% and 17.5% of trials, respectively. Information was partially missing for some parameters. Notwithstanding, and despite its descriptive nature, this research has enhanced the evidence of the literature on pipelines for NDs. Future contributions may further investigate whether trials metrics are consistent with the characteristics of the interested countries and the explicative variables of trials location, target

  7. Latest Development and Application of Nb-Bearing High Strength Pipeline Steels

    Science.gov (United States)

    Zhang, Yongqing; Shang, Chengjia; Guo, Aimin; Zheng, Lei; Niu, Tao; Han, Xiulin

    In order to solve the pollution problem emerging in China recently, China's central government is making great efforts to raise the percentage of natural gas consumption in the China's primary energy mix, which needs to construct big pipelines to transport natural gas from the nation's resource-rich western regions to the energy-starved east, as well as import from the Central Asia and Russia. With this mainstream trend, high strength, high toughness, heavy gauge, and large diameter pipeline steels are needed to improve the transportation efficiency. This paper describes the latest progresses in Nb-bearing high strength pipeline steels with regard to metallurgical design, development and application, including X80 coil with a thickness up to 22.0mm, X80 plate with a diameter as much as 1422mm, X80 plate with low-temperature requirements and low-Mn sour service X65 for harsh sour service environments. Moreover, based on widely accepted TMCP and HTP practices with low carbon and Nb micro-alloying design, this paper also investigated some new metallurgical phenomena based on powerful rolling mills and heavy ACC equipment.

  8. Application of computer code ALMOD in transient analysis with reverse flow in the primary loop of nuclear power plant; Primjena programa ALMOD u analizi prijelaznih pojava sa reverzibilnim protokom u primarnom krugu nuklerne elektrane

    Energy Technology Data Exchange (ETDEWEB)

    Bencik, V [Elektrotehnicki Institut ' Rade Koncar' , Zagreb (Yugoslavia); Feretic, D; Debrecin, N [Elektrotehnicki fakultet, Zagreb (Yugoslavia)

    1989-07-01

    A computer code ALMOD 3W3 to analyze the transients in which reverse flow in the primary loop of nuclear power plant may occur has been developed. The method to calculate the fluid dynamics in NRC system is presented. The locked rotor accident in one coolant loop is analyzed. (author)

  9. A quick guide to pipeline engineering

    CERN Document Server

    Alkazraji, D

    2008-01-01

    Pipeline engineering requires an understanding of a wide range of topics. Operators must take into account numerous pipeline codes and standards, calculation approaches, and reference materials in order to make accurate and informed decisions.A Quick Guide to Pipeline Engineering provides concise, easy-to-use, and accessible information on onshore and offshore pipeline engineering. Topics covered include: design; construction; testing; operation and maintenance; and decommissioning.Basic principles are discussed and clear guidance on regulations is provided, in a way that will

  10. Optimal valve location in long oil pipelines

    OpenAIRE

    Grigoriev, A.; Grigorieva, N.V.

    2007-01-01

    We address the valve location problem, one of the basic problems in design of long oil pipelines. Whenever a pipeline is depressurized, the shutoff valves block the oil flow and seal the damaged part of the pipeline. Thus, the quantity of oil possibly contaminating the area around the pipeline is determined by the volume of the damaged section of the pipeline between two consecutive valves. Then, ecologic damage can be quantified by the amount of leaked oil and the environmental characteristi...

  11. Solving an unpiggable pipeline challenge

    Energy Technology Data Exchange (ETDEWEB)

    Walker, James R. [GE Oil and Gas, PII Pipeline Solutions, Cramlington Northumberland (United Kingdom); Kern, Michael [National Grid, New Hampshire (United Kingdom)

    2009-07-01

    Technically, any pipeline can be retrofitted to enable in line inspection. Sensibly however, the expense of excavations and construction of permanent facilities have been, in many cases, exceedingly prohibitive. Even where traditional modifications are feasible from engineering perspectives, flow interruption may not be an option - either because they are critical supply lines or because the associated lost revenues could be nearly insurmountable. Savvy pipeline integrity managers know the safety issue that is at stake over the long term. They are also well aware of the accuracy benefits that high-quality in-line inspection data offer over potentially supply disruptive alternatives such as hydrostatic testing. To complicate matters further, many operators, particularly in the US, now face regulatory pressure to assess the integrity of their yet-uninspected pipelines located in highly populated areas. This paper describes an important project National Grid undertook that made use of a unique pipeline access method that did not require permanent installation of expensive facilities required for in line inspection of a pipeline previously considered 'unpiggable'. Since the pipeline was located in an urban area, flow disruption had to be minimized. This paper will define the project background, its challenges, outcomes and lessons learned for the future. (author)

  12. Fishing activity near offshore pipelines, 2017

    NARCIS (Netherlands)

    Machiels, Marcel

    2018-01-01

    On the North Sea bottom lie numerous pipelines to link oil- or gas offshore drilling units, - platforms and processing stations on land. Although pipeline tubes are coated and covered with protective layers, the pipelines risk being damaged through man-made hazards like anchor dropping and fishing

  13. 76 FR 54531 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes

    Science.gov (United States)

    2011-09-01

    ... prescribed in Sec. 195.452(h).'' Operators of shallow-water gas and hazardous liquid pipelines in the Gulf of... pipeline safety: 1. Identify persons who normally engage in shallow-water commercial fishing, shrimping... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...

  14. Living and working near pipelines : Landowner guide 2002

    International Nuclear Information System (INIS)

    Anon

    2002-01-01

    The transportation of natural gas, oil and other commodities is effected by pipelines throughout most of the country. Safety in the vicinity of a pipeline is very important because damage to a pipeline could result in adverse conditions to public safety and/or the environment. Before digging, written approval must be obtained from the pipeline company. If a landowner is having difficulty negotiating an agreement with the pipeline company, they should call the National Energy Board. It is illegal to construct or excavate without authorization, and approval or denial of a request must be granted within 10 business days by the pipeline company. Three days are allowed to the pipeline company to locate its pipeline. A section dealing with pipeline right-of-way is included, as well as the safety zone and the restricted area. A 10-step checklist of safety tips assists the landowner in taking the appropriate measures in the vicinity of a pipeline. A brief overview of the responsibilities of the National Energy Board is provided, followed by a list of the main pipelines regulated by the National Energy Board. 2 figs

  15. Nonlinear dynamic response analysis in piping system for a loss of coolant accident in primary loop of pressurized water reactor

    International Nuclear Information System (INIS)

    Zhang Xiwen; He Feng; Hao Pengfei; Wang Xuefang

    2000-01-01

    Based on the elaborate force and moment analysis with characteristics method and control-volume integrating method for the piping system of primary loop under pressurized water reactor' loss of coolant accident (LOCA) conditions, the nonlinear dynamic response of this system is calculated by the updated Lagrangian formulation (ADINA code). The piping system and virtual underpinning are specially processed, the move displacement of the broken pipe with time is accurately acquired, which is very important and useful for the design of piping system and virtual underpinning

  16. Submarine pipelines and the North Sea environment

    International Nuclear Information System (INIS)

    Haldane, D.; Paul, M.A.; Reuben, R.L.; Side, J.C.

    1992-01-01

    The function and design of pipelines for use on the United Kingdom continental shelf are described. Environmental influences which can threaten the integrity of seabed pipelines in the North Sea include hydrodynamic forces due to residual, tidal and wave currents, the nature of seabed sediments and corrosion by seawater. Damage may be caused to pipelines by interaction with vessel anchors and with fishing gear. Special care has to be taken over the selection of the general area for the landfall of a pipeline and the engineering of the installation where the pipeline comes ashore. Trenching and other protection techniques for pipelines are discussed together with hydrostatic testing and commissioning and subsequent inspection, maintenance and repair. (UK)

  17. The Very Large Array Data Processing Pipeline

    Science.gov (United States)

    Kent, Brian R.; Masters, Joseph S.; Chandler, Claire J.; Davis, Lindsey E.; Kern, Jeffrey S.; Ott, Juergen; Schinzel, Frank K.; Medlin, Drew; Muders, Dirk; Williams, Stewart; Geers, Vincent C.; Momjian, Emmanuel; Butler, Bryan J.; Nakazato, Takeshi; Sugimoto, Kanako

    2018-01-01

    We present the VLA Pipeline, software that is part of the larger pipeline processing framework used for the Karl G. Jansky Very Large Array (VLA), and Atacama Large Millimeter/sub-millimeter Array (ALMA) for both interferometric and single dish observations.Through a collection of base code jointly used by the VLA and ALMA, the pipeline builds a hierarchy of classes to execute individual atomic pipeline tasks within the Common Astronomy Software Applications (CASA) package. Each pipeline task contains heuristics designed by the team to actively decide the best processing path and execution parameters for calibration and imaging. The pipeline code is developed and written in Python and uses a "context" structure for tracking the heuristic decisions and processing results. The pipeline "weblog" acts as the user interface in verifying the quality assurance of each calibration and imaging stage. The majority of VLA scheduling blocks above 1 GHz are now processed with the standard continuum recipe of the pipeline and offer a calibrated measurement set as a basic data product to observatory users. In addition, the pipeline is used for processing data from the VLA Sky Survey (VLASS), a seven year community-driven endeavor started in September 2017 to survey the entire sky down to a declination of -40 degrees at S-band (2-4 GHz). This 5500 hour next-generation large radio survey will explore the time and spectral domains, relying on pipeline processing to generate calibrated measurement sets, polarimetry, and imaging data products that are available to the astronomical community with no proprietary period. Here we present an overview of the pipeline design philosophy, heuristics, and calibration and imaging results produced by the pipeline. Future development will include the testing of spectral line recipes, low signal-to-noise heuristics, and serving as a testing platform for science ready data products.The pipeline is developed as part of the CASA software package by an

  18. Engineered pipeline field joint coating solutions for demanding conditions

    Energy Technology Data Exchange (ETDEWEB)

    Lwemuchi, Andre L.; Gudme, Carl C.; Buchanan, Robert [Canusa-CPS, Toronto, OT (Canada)

    2009-12-19

    Trends in the oil and gas pipeline industry see that the demand for new technologies and engineered solutions for pipeline external coatings are increasing. In general, superior mechanical resistance and long term performance are being required in addition to operating at higher temperatures. This demand for more robust coatings has been created because of factors such as more remote fields, deep onshore reservoirs, deep water offshore fields and heavy oil that must be pumped at higher temperatures. The development of new techniques for pipeline construction is also exposing the coatings to more aggressive construction conditions. Because of this, the use of three layer and multi-layer polypropylene mainline coating systems have been growing considerably. Following this trend, the field joint coating manufacturers developed polypropylene systems and more recently had to work on engineered solutions required for recent offshore projects in Europe where very thick polypropylene field joint heat-shrinkable systems were provided. In addition, projects in remote locations such as the recently completed projects in the Brazilian Amazon required special logistics and field services. The growth of the mining industry in South America with slurry pipelines constructed in the recent years also demanded thicker, more robust coatings. The popularization of directional drilling and shore approach applications moved the industry to develop improved abrasion resistant coating systems such as using sacrificial elements to protect the primary coating integrity after the pipeline pull. PETROBRAS plans to replace existing thermally insulated pipelines crossing Great Sao Paulo. Therefore, pumping heavy oil at high temperatures created the need to develop improved mainline and field joint coatings to avoid having the same sort of problems they are facing in existing thermally insulated lines. Due to these needs, the field joint coating manufactures have been challenged to provide

  19. Overview of interstate hydrogen pipeline systems

    International Nuclear Information System (INIS)

    Gillette, J.L.; Kolpa, R.L.

    2008-01-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  20. Overview of interstate hydrogen pipeline systems.

    Energy Technology Data Exchange (ETDEWEB)

    Gillette, J .L.; Kolpa, R. L

    2008-02-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  1. Transmission pipeline calculations and simulations manual

    CERN Document Server

    Menon, E Shashi

    2014-01-01

    Transmission Pipeline Calculations and Simulations Manual is a valuable time- and money-saving tool to quickly pinpoint the essential formulae, equations, and calculations needed for transmission pipeline routing and construction decisions. The manual's three-part treatment starts with gas and petroleum data tables, followed by self-contained chapters concerning applications. Case studies at the end of each chapter provide practical experience for problem solving. Topics in this book include pressure and temperature profile of natural gas pipelines, how to size pipelines for specified f

  2. Pipeline rehabilitation planning

    Energy Technology Data Exchange (ETDEWEB)

    Palmer-Jones, Roland; Hopkins, Phil; Eyre, David [PENSPEN (United Kingdom)

    2005-07-01

    An operator faced with an onshore pipeline that has extensive damage must consider the need for rehabilitation, the sort of rehabilitation to be used, and the rehabilitation schedule. This paper will consider pipeline rehabilitation based on the authors' experiences from recent projects, and recommend a simple strategy for planning pipeline rehabilitation. It will also consider rehabilitation options: external re-coating; internal lining; internal painting; programmed repairs. The main focus will be external re-coating. Consideration will be given to rehabilitation coating types, including tape wraps, epoxy, and polyurethane. Finally it will discuss different options for scheduling the rehabilitation of corrosion damage including: the statistical comparison of signals from inspection pigs; statistical comparison of selected measurements from inspection pigs and other inspections; the use of corrosion rates estimated for the mechanisms and conditions; expert judgement. (author)

  3. Tubular lining material for pipelines having bends

    Energy Technology Data Exchange (ETDEWEB)

    Moringa, A.; Sakaguchi, Y.; Hyodo, M.; Yagi, I.

    1987-03-24

    A tubular lining material for pipelines having bends or curved portions comprises a tubular textile jacket made of warps and wefts woven in a tubular form overlaid with a coating of a flexible synthetic resin. It is applicable onto the inner surface of a pipeline having bends or curved portions in such manner that the tubular lining material with a binder onto the inner surface thereof is inserted into the pipeline and allowed to advance within the pipeline, with or without the aid of a leading rope-like elongated element, while turning the tubular lining material inside out under fluid pressure. In this manner the tubular lining material is applied onto the inner surface of the pipeline with the binder being interposed between the pipeline and the tubular lining material. The lining material is characterized in that a part of all of the warps are comprised of an elastic yarn around which, over the full length thereof, a synthetic fiber yarn or yarns have been left-and/or right-handedly coiled. This tubular lining material is particularly suitable for lining a pipeline having an inner diameter of 25-200 mm and a plurality of bends, such as gas service pipelines or house pipelines, without occurrence of wrinkles in the lining material in a bend.

  4. Dynamic pressure measures for long pipeline leak detection

    Energy Technology Data Exchange (ETDEWEB)

    Likun Wang; Hongchao Wang; Min Xiong; Bin Xu; Dongjie Tan; Hengzhang Zhou [PetroChina Pipeline Company, Langfang (China). R and D Center

    2009-07-01

    Pipeline leak detection method based on dynamic pressure is studied. The feature of dynamic pressure which is generated by the leakage of pipeline is analyzed. The dynamic pressure method is compared with the static pressure method for the advantages and disadvantages in pipeline leak detection. The dynamic pressure signal is suitable for pipeline leak detection for quick-change of pipeline internal pressure. Field tests show that the dynamic pressure method detects pipeline leak rapidly and precisely. (author)

  5. Arctic pipeline planning design, construction, and equipment

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Utilize the most recent developments to combat challenges such as ice mechanics. The perfect companion for engineers wishing to learn state-of-the-art methods or further develop their knowledge of best practice techniques, Arctic Pipeline Planning provides a working knowledge of the technology and techniques for laying pipelines in the coldest regions of the world. Arctic Pipeline Planning provides must-have elements that can be utilized through all phases of arctic pipeline planning and construction. This includes information on how to: Solve challenges in designing arctic pipelines Protect pipelines from everyday threats such as ice gouging and permafrost Maintain safety and communication for construction workers while supporting typical codes and standards Covers such issues as land survey, trenching or above ground, environmental impact of construction Provides on-site problem-solving techniques utilized through all phases of arctic pipeline planning and construction Is packed with easy-to-read and under...

  6. Oil pipeline energy consumption and efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Hooker, J.N.

    1981-01-01

    This report describes an investigation of energy consumption and efficiency of oil pipelines in the US in 1978. It is based on a simulation of the actual movement of oil on a very detailed representation of the pipeline network, and it uses engineering equations to calculate the energy that pipeline pumps must have exerted on the oil to move it in this manner. The efficiencies of pumps and drivers are estimated so as to arrive at the amount of energy consumed at pumping stations. The throughput in each pipeline segment is estimated by distributing each pipeline company's reported oil movements over its segments in proportions predicted by regression equations that show typical throughput and throughput capacity as functions of pipe diameter. The form of the equations is justified by a generalized cost-engineering study of pipelining, and their parameters are estimated using new techniques developed for the purpose. A simplified model of flow scheduling is chosen on the basis of actual energy use data obtained from a few companies. The study yields energy consumption and intensiveness estimates for crude oil trunk lines, crude oil gathering lines and oil products lines, for the nation as well as by state and by pipe diameter. It characterizes the efficiency of typical pipelines of various diameters operating at capacity. Ancillary results include estimates of oil movements by state and by diameter and approximate pipeline capacity utilization nationwide.

  7. Economic evaluation: wood stave pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Rook, M.E.

    The spray of leakage from the wood stave water supply pipeline serving the New England Power Company's (NEPCO) Searsburg hydroelectric development had caused this facility to be dubbed ''The Searsburg Car Wash.'' In July, 1982, excessive leakage from this pipeline prompted NEPCO to perform a technical inspection which would inform the company's decision to replace, repair, or abandon the pipeline. The inspection indicated that a combination of interrelated factors has led to rapid deterioration. The feasibility study, which included a benefit -cost analysis of a times replacement with a continued repair program weighed annually by a risk factor representing the probability of pipeline failure during the replacement period, determined that direct replacement was most advantageous. 4 figures, 1 figures.

  8. Acoustic system for communication in pipelines

    Science.gov (United States)

    Martin, II, Louis Peter; Cooper, John F [Oakland, CA

    2008-09-09

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  9. A challenge of regional integration: the Southern Argentinian pipeline enlargement; Desafio de integracao regional: ampliacao do gasoduto Sul-Argentino

    Energy Technology Data Exchange (ETDEWEB)

    Sardi, Oscar; Sosa, Damian [Transportadora de Gas del Sur S.A., Buenos Aires (Argentina); Duarte Filho, Arno [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The enlargement of the pipelines of Southern Argentina comprised the construction of around 500 km of 30' and 36' loops in the first semester of 2005 and presented many peculiarities. It has been the first enlargement of the argentinian pipeline system since the country's default statement, in 2001, and it has been financed and built by a bi national Brazilian-Argentinian consortium. It has also been the first time that a governmental trusteeship has been used in such an enterprise in Argentina to guarantee the necessary funds. The increasing demand of natural gas to industries and power generation plants brought about by Argentina's recent growth has stated the sense of urgency: the construction must be on duty in June 2005, ready to increase de flow of gas to the Provincia de Buenos Aires and Great Buenos Aires regions. This has represented also a technical challenge, due to the small time to built the loops, the geographical distribution of the construction, which extends from Patagonia to the Great Buenos Aires region and the meteorological conditions of the period of the construction. The article describes the negotiations done to assemble the construction's financial and managerial frameworks, the building and the solutions found to face the challenge and to meet the deadline. (author)

  10. Pipelines, inexpensive and safe mode of transport

    Energy Technology Data Exchange (ETDEWEB)

    Grover, D D

    1979-01-01

    Pipelines are the leading bulk commodity transporter and should play an even more important role in the future of energy transportation and distribution. As fossil fuel and low-cost uranium resources become depleted, it will be economical to produce hydrogen by electrolysis and transport it through underground pipelines to points of consumption. The cost would be only two to three times that of transporting natural gas per unit of heat energy and substantially less than the cost of transporting electric energy in overhead, extra-high-voltage transmission lines. Pipeline design, including economic pipe diameter; pipe material; operation by remote control and automation; cathodic protection; pipeline construction; and pipeline maintenance, particularly as regards the 1157 km long Oil India Pipeline, are discussed.

  11. Health, safety and environment risk assessment in gas pipelines by indexing method:case of Kermanshah Sanandaj oil pipeline

    Directory of Open Access Journals (Sweden)

    Y. Hamidi

    2009-10-01

    Full Text Available Background and AimsUsing pipelines for oil products transportation involves ranges of safety, health and environmental risks, this option however, is dominant with numerous  advantages. The purpose of this study was; relative risk assessment of abovementioned risk in Kermanshah-Sanandaj Oil Pipeline.MethodsThe method used in this study was Kent Muhlbauer method in which relative risk was assessed using third-party damage, corrosion, design, incorrect operations and leak impact  factor.ResultsOnce applying this method, collection of required data and performing needed experiments, scoring results showed 96 risk segments along the pipeline length in which lengths 100+860, 101+384 and 103+670 had relative risk scores 9.74, 9.82 and 9.91 respectively and therefore these segments were identified as focal risk points and priority for improvement actions.ConclusionRegarding importance of pipeline failure, inspection and regular patrol along the pipeline route, precise control of cathodic protection of pipeline and using communication technologies such as SCADA or optical fibers along the pipeline route were amongst the mostimportant control action suggested by the study.

  12. Bulletin 2005-12 : revised Alberta pipeline regulation issued

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-05-31

    A revised Pipeline Regulation has been issued and is currently available on the Alberta Energy and Utilities Board (EUB) website. Changes to the regulation reflect bothchanges in EUB regulatory policy and processes and technological improvements. Goals of the revision include improvements in overall pipeline performance, and the implementation of recommendations derived from the Public Safety and Sour Gas Committee concerning sour gas pipeline safety. The regulation was re-organized for greater clarity, and structured into 11 parts. Issues concerning the transition to the revised regulation were presented. The summary of notable administrative changes included clarifications of when a pipeline application is not required; when ABSA approval is required for steam lines; situations for which low-pressure natural gas lines must be licensed; and emergency response requirements. Technical clarifications include requirements for pipeline operations and maintenance manuals; composite materials; limitations on amounts of H{sub 2}S in polymeric pipe; pressure mismatches; approval for testing with gaseous media; venting of small volumes of raw gas; right-of-way surveillance; inspection of surface construction activities; annual corrosion evaluations; registering of pipelines and excavators in controlled areas with Alberta One-Call; ground disturbance training; restoration and signage maintenance on abandoned pipelines; sour service steel pipelines; unused pipelines and abandoned pipelines; and remediation of stub ends in operating pipelines.

  13. Dislocation climb and interstitial loop growth under cascade damage irradiation

    International Nuclear Information System (INIS)

    Woo, C.H.; Semenov, A.A.

    1993-01-01

    The effects of intracascade clustering and recombination in radiation damage have been considered previously in semiquantitative calculations involving vacancy accumulation at voids, within the concept of production bias. To model void swelling and microstructural evolution quantitatively, similar effects on dislocation climb and interstitial loop growth have to be considered. In this regard, at elevated temperatures (such as in the peak-swelling temperature regime), the concentration of freely migrating vacancies is much higher than that of the interstitials, owing to the evaporation from the primary vacancy clusters (i.e. those produced by intracascade clustering). It is not immediately obvious how the dislocations can be net interstitials sinks, and hence that the observed nucleation and growth of the interstitial loops at elevated temperatures can be correctly predicted as in the conventional theory. To address these basic questions, a rate theory model is formulated in this paper, which describes the dislocation climb and loop growth in the presence of intracascade primary clusters. Within this model, conservation equations for the concentrations and average radii of the two kinds of primary cluster are derived, and the corresponding steady-state concentrations and average radii are calculated. From this, the dislocation climb velocity and interstitial loop growth rate are calculated. On the basis of the results of this calculation, some of the basic questions of production bias are discussed. (Author)

  14. Leak detection systems as a central component of pipeline safety concepts; Leckueberwachungssysteme als zentrale Bestandteile von Pipeline-Sicherheitskonzepten

    Energy Technology Data Exchange (ETDEWEB)

    Vogt, Daniel [KROHNE Oil and Gas B.V., Breda (Netherlands)

    2013-03-15

    The transport of materials in pipelines is continuously increasing worldwide. Pipelines are one of the most economic and safe transport systems in all directions. In order to ensure this, not only new pipelines but also existing pipelines have to be kept up to date technically. Leakages are a possible safety risk. Leaks are manifold and range from earth quakes, corrosion or material fatigue up to open-up by drilling by thieves. A specific leakage detection often is used in order to limit the risks. The minimization of the consequences of accidents, downtimes and product losses as well as regulatory procedures is the reason for the detection of leakages. Leaks in pipelines can be detected on different kinds - from a simple visual inspection during the inspection up to computer-assisted systems monitoring certain states also in underground and submarine pipeline.

  15. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  16. Overview of the design, construction, and operation of interstate liquid petroleum pipelines.

    Energy Technology Data Exchange (ETDEWEB)

    Pharris, T. C.; Kolpa, R. L.

    2008-01-31

    approximately 55,000 miles of crude oil trunk lines (usually 8 to 24 inches in diameter) in the United States that connect regional markets. The United States also has an estimated 30,000 to 40,000 miles of small gathering lines (usually 2 to 6 inches in diameter) located primarily in Texas, Oklahoma, Louisiana, and Wyoming, with small systems in a number of other oil producing states. These small lines gather the oil from many wells, both onshore and offshore, and connect to larger trunk lines measuring 8 to 24 inches in diameter. There are approximately 95,000 miles of refined products pipelines nationwide. Refined products pipelines are found in almost every state in the United States, with the exception of some New England states. These refined product pipelines vary in size from relatively small, 8- to 12-inch-diameter lines, to up to 42 inches in diameter. The overview of pipeline design, installation, and operation provided in the following sections is only a cursory treatment. Readers interested in more detailed discussions are invited to consult the myriad engineering publications available that provide such details. The two primary publications on which the following discussions are based are: Oil and Gas Pipeline Fundamentals (Kennedy 1993) and the Pipeline Rules of Thumb Handbook (McAllister 2002). Both are recommended references for additional reading for those requiring additional details. Websites maintained by various pipeline operators also can provide much useful information, as well as links to other sources of information. In particular, the website maintained by the U.S. Department of Energy's Energy Information Administration (EIA) (http://www.eia.doe.gov) is recommended. An excellent bibliography on pipeline standards and practices, including special considerations for pipelines in Arctic climates, has been published jointly by librarians for the Alyeska Pipeline Service Company (operators of the Trans-Alaska Pipeline System [TAPS]) and the

  17. optimization for trenchless reconstruction of pipelines

    Directory of Open Access Journals (Sweden)

    Zhmakov Gennadiy Nikolaevich

    2015-01-01

    Full Text Available Today the technologies of trenchless reconstruction of pipelines are becoming and more widely used in Russia and abroad. One of the most perspective is methods is shock-free destruction of the old pipeline being replaced with the help of hydraulic installations with working mechanism representing a cutting unit with knife disks and a conic expander. A construction of a working mechanism, which allows making trenchless reconstruction of pipelines of different diameters, is optimized and patented and its developmental prototype is manufactured. The dependence of pipeline cutting force from knifes obtusion of the working mechanisms. The cutting force of old steel pipelines with obtuse knife increases proportional to the value of its obtusion. Two stands for endurance tests of the knifes in laboratory environment are offered and patented.

  18. Stress analysis and mitigation measures for floating pipeline

    Science.gov (United States)

    Wenpeng, Guo; Yuqing, Liu; Chao, Li

    2017-03-01

    Pipeline-floating is a kind of accident with contingency and uncertainty associated to natural gas pipeline occurring during rainy season, which is significantly harmful to the safety of pipeline. Treatment measures against pipeline floating accident are summarized in this paper on the basis of practical project cases. Stress states of pipeline upon floating are analyzed by means of Finite Element Calculation method. The effectiveness of prevention ways and subsequent mitigation measures upon pipeline-floating are verified for giving guidance to the mitigation of such accidents.

  19. Inquiry into the Alaska road pipeline. Enquete sur le pipeline de la route de l'Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Rowan, P

    1977-01-01

    This report is addressed to the Minister of Indian Affairs and to the Canadian North in Ottawa and deals with the social and economic impacts of a proposed gas pipeline in the South of Yukon and with the attitudes of the Yukonnese people with respect to this project. Many public hearings were held. The report discusses the Yukon people (Indians and non-Indians) and the consequences of the projected pipeline on the environment, the economics of the region and the way of life of its people. The report also presents the claims of the Indians pertaining to the land. It is advocated that an advance payment of $50M be made to the Indians and that the pipeline corporation pay a compensation of at least $200M to a fund administered by the Yukon. An organization for planning and regulating the pipeline should be establised. It is advised to delay constructing the pipeline until August 1981. Other recommendations are made. Many witnesses supported a layout following roughly the Tintina groove, but none supported the Dawson deviation. Most witnesses opposed constructing the lateral Dempster pipeline for the moment. The report is illustrated with numerous colour photographs. 7 figs., 2 tabs.

  20. Methodology for environmental audit of execution in gas-pipelines and pipelines

    International Nuclear Information System (INIS)

    Hurtado Palomino, Maria Patricia; Vargas Bejarano, Carlos Hernando

    1999-01-01

    In first instance the constructive aspects and the environmental impact related with the gas-pipes and pipelines construction are presented; then a methodology to make the environmental audit of execution in gas-pipes and pipelines, is showed. They contemplate four stages basically: planning, pre-auditory, execution and analysis, and post-auditory with their respective activities. Also, it is given to know, generalities of the practical case, to evaluate the applicability of the proposed methodology

  1. Best practices for the abandonment of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mackean, M; Reed, R; Snow, B [Nabors Canada, Calgary, AB (Canada). Abandonrite Service

    2006-07-01

    Pipeline regulations implemented in 2006 require that licensees register all pipelines. Training must also be provided for ground disturbance supervisors. In addition, signage must be maintained on abandoned pipelines, and discontinued pipelines must be properly isolated. Corrosion control and internal inhibition is required for discontinued lines. However, pipelines are often neglected during the well abandonment process. This presentation provided recommendations for coordinating well and pipeline abandonment processes. Pipeline ends can be located, depressurized, flushed and purged while wells are being abandoned. Contaminated soils around the wells can also be identified prior to reclamation activities. Administrative reviews must be conducted in order to provide accurate information on pipeline location, reclamation certification, and line break history. Field operation files must be reviewed before preliminary field work is conducted. Site inspections should be used to determine if all ends of the line are accessible. Landowners and occupants near the line must also be notified, and relevant documentation must be obtained. Skilled technicians must be used to assess the lines for obstructions as well as to cut and cap the lines after removing risers. The presentation also examined issues related to pressure change, movement, cold tapping, and live dead legs. tabs., figs.

  2. Comparisons of sediment losses from a newly constructed cross-country natural gas pipeline and an existing in-road pipeline

    Science.gov (United States)

    Pamela J. Edwards; Bridget M. Harrison; Daniel J. Holz; Karl W.J. Williard; Jon E. Schoonover

    2014-01-01

    Sediment loads were measured for about one year from natural gas pipelines in two studies in north central West Virginia. One study involved a 1-year-old pipeline buried within the bed of a 25-year-old skid road, and the other involved a newly constructed cross-country pipeline. Both pipelines were the same diameter and were installed using similar trenching and...

  3. 77 FR 27279 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-05-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  4. 75 FR 53733 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-09-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0246] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous... liquefied natural gas, hazardous liquid, and gas transmission pipeline systems operated by a company. The...

  5. 77 FR 46155 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-02

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  6. Diagnosing plant pipeline system performance using radiotracer techniques

    Energy Technology Data Exchange (ETDEWEB)

    Kasban, H.; Ali, Elsayed H.; Arafa, H. [Engineering Department, Nuclear Research Center, Atomic Energy Authority, Inshas (Egypt)

    2017-02-15

    This study presents an experimental work in a petrochemical company for scanning a buried pipeline using Tc{sup 99m} radiotracer based on the measured velocity changes, in order to determine the flow reduction along a pipeline. In this work, Tc{sup 99m} radiotracer was injected into the pipeline and monitored by sodium iodide scintillation detectors located at several positions along the pipeline. The flow velocity has been calculated between every two consecutive detectors along the pipeline. Practically, six experiments have been carried out using two different data acquisition systems, each of them being connected to four detectors. During the fifth experiment, a bypass was discovered between the scanned pipeline and another buried parallel pipeline connected after the injection point. The results indicate that the bypass had a bad effect on the volumetric flow rate in the scanned pipeline.

  7. 78 FR 46560 - Pipeline Safety: Class Location Requirements

    Science.gov (United States)

    2013-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... class location requirements for gas transmission pipelines. Section 5 of the Pipeline Safety, Regulatory... and, with respect to gas transmission pipeline facilities, whether applying IMP requirements to...

  8. 77 FR 15453 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-03-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... information collection titled, ``Gas Pipeline Safety Program Certification and Hazardous Liquid Pipeline... collection request that PHMSA will be submitting to OMB for renewal titled, ``Gas Pipeline Safety Program...

  9. Pipeline Decommissioning Trial AWE Berkshire UK - 13619

    Energy Technology Data Exchange (ETDEWEB)

    Agnew, Kieran [AWE, Aldermaston, Reading, RG7 4PR (United Kingdom)

    2013-07-01

    This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes

  10. 77 FR 51848 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-27

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Program for Gas Distribution Pipelines. DATES: Interested persons are invited to submit comments on or.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and...

  11. 77 FR 26822 - Pipeline Safety: Verification of Records

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0068] Pipeline Safety: Verification of Records AGENCY: Pipeline and Hazardous Materials... issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities to verify...

  12. 77 FR 74275 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-12-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and... control room. Affected Public: Operators of both natural gas and hazardous liquid pipeline systems. Annual...

  13. Increase of ecological safety of the pipeline

    International Nuclear Information System (INIS)

    Dr Movsumov, Sh.N.; Prof Aliyev, F.G.

    2005-01-01

    Full text : For increase of ecological safety of the pipeline, necessary decrease of damage (risk) rendered by the pipeline on surrounding natural environment which depends: on the frequency of damage of the pipeline; on the volume poured oil; on the factor of sensitivity of an environment where flood of oil was. Frequency of damage of the pipeline depends on physico-chemical properties of a material of the pipeline, from its technical characteristics (thickness of a wall, length of a pipe, working pressure), on the seismic area of the district where the pipeline passed and also on the way of lining of the pipeline (underground or overground). The volume poured oil depends on diameter of the received damage, from stability of the pipeline mechanical and other external actions, from an ambient temperature, from capacity of the pipeline, from distance between the latches established in the pipeline, and also from time, necessary for their full closing. The factor of sensitivity of environment depends on geological structure and landscapes of district (mountain, the river, settlements) where passed the pipeline. At designing the pipeline, in report is shown questions of increase of ecological safety of the pipeline are considered at his construction and exploitation. For improvement of ecological safety of the pipeline is necessary to hold the following actions: Ecological education of the public, living near along a line of the oil pipeline; carrying out ecological monitoring; working of the public plan of response to oil spills; For ecological education of the public is necessary: carrying out informing of the public for all (technical, ecological, social and economic and legal) questions connected to an oil pipeline, and also on methods of protection of the rights at participation in acceptance of ecological significant decisions; Creation of public groups for realization of activity on observance of the legislation and to prevention of risks; Exposure of hot

  14. Pipeline monitoring with unmanned aerial vehicles

    Science.gov (United States)

    Kochetkova, L. I.

    2018-05-01

    Pipeline leakage during transportation of combustible substances leads to explosion and fire thus causing death of people and destruction of production and accommodation facilities. Continuous pipeline monitoring allows identifying leaks in due time and quickly taking measures for their elimination. The paper describes the solution of identification of pipeline leakage using unmanned aerial vehicles. It is recommended to apply the spectral analysis with input RGB signal to identify pipeline damages. The application of multi-zone digital images allows defining potential spill of oil hydrocarbons as well as possible soil pollution. The method of multi-temporal digital images within the visible region makes it possible to define changes in soil morphology for its subsequent analysis. The given solution is cost efficient and reliable thus allowing reducing timing and labor resources in comparison with other methods of pipeline monitoring.

  15. Efficiency improvements in pipeline transportation systems

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.; Horton, J. F.

    1977-09-09

    This report identifies potential energy-conservative pipeline innovations that are most energy- and cost-effective and formulates recommendations for the R, D, and D programs needed to exploit those opportunities. From a candidate field of over twenty classes of efficiency improvements, eight systems are recommended for pursuit. Most of these possess two highly important attributes: large potential energy savings and broad applicability outside the pipeline industry. The R, D, and D program for each improvement and the recommended immediate next step are described. The eight technologies recommended for R, D, and D are gas-fired combined cycle compressor station; internally cooled internal combustion engine; methanol-coal slurry pipeline; methanol-coal slurry-fired and coal-fired engines; indirect-fired coal-burning combined-cycle pump station; fuel-cell pump station; drag-reducing additives in liquid pipelines; and internal coatings in pipelines.

  16. 75 FR 73160 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-11-29

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...-Related Conditions on Gas, Hazardous Liquid, and Carbon Dioxide Pipelines and Liquefied Natural Gas... Pipelines and Liquefied Natural Gas Facilities.'' The Pipeline Safety Laws (49 U.S.C. 60132) require each...

  17. California Natural Gas Pipelines: A Brief Guide

    Energy Technology Data Exchange (ETDEWEB)

    Neuscamman, Stephanie [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Price, Don [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pezzola, Genny [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Glascoe, Lee [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-01-22

    The purpose of this document is to familiarize the reader with the general configuration and operation of the natural gas pipelines in California and to discuss potential LLNL contributions that would support the Partnership for the 21st Century collaboration. First, pipeline infrastructure will be reviewed. Then, recent pipeline events will be examined. Selected current pipeline industry research will be summarized. Finally, industry acronyms are listed for reference.

  18. Pipeline integrity: ILI baseline data for QRA

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd R. [Tuboscope Pipeline Services, Houston, TX (United States)]. E-mail: tporter@varco.com; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil)]. E-mail: guto@pipeway.com; Marr, James [MARR and Associates, Calgary, AB (Canada)]. E-mail: jmarr@marr-associates.com

    2003-07-01

    The initial phase of a pipeline integrity management program (IMP) is conducting a baseline assessment of the pipeline system and segments as part of Quantitative Risk Assessment (QRA). This gives the operator's integrity team the opportunity to identify critical areas and deficiencies in the protection, maintenance, and mitigation strategies. As a part of data gathering and integration of a wide variety of sources, in-line inspection (ILI) data is a key element. In order to move forward in the integrity program development and execution, the baseline geometry of the pipeline must be determined with accuracy and confidence. From this, all subsequent analysis and conclusions will be derived. Tuboscope Pipeline Services (TPS), in conjunction with Pipeway Engenharia of Brazil, operate ILI inertial navigation system (INS) and Caliper geometry tools, to address this integrity requirement. This INS and Caliper ILI tool data provides pipeline trajectory at centimeter level resolution and sub-metre 3D position accuracy along with internal geometry - ovality, dents, misalignment, and wrinkle/buckle characterization. Global strain can be derived from precise INS curvature measurements and departure from the initial pipeline state. Accurate pipeline elevation profile data is essential in the identification of sag/over bend sections for fluid dynamic and hydrostatic calculations. This data, along with pipeline construction, operations, direct assessment and maintenance data is integrated in LinaViewPRO{sup TM}, a pipeline data management system for decision support functions, and subsequent QRA operations. This technology provides the baseline for an informed, accurate and confident integrity management program. This paper/presentation will detail these aspects of an effective IMP, and experience will be presented, showing the benefits for liquid and gas pipeline systems. (author)

  19. Flooding simulation of hilly pipeline commisionning process

    Energy Technology Data Exchange (ETDEWEB)

    Nan, Zhang [China National Oil and Gas Exploration and Development Corporation and China University of Petroleum, Beijing (China); Jing, Gong [China University of Petroleum, Beijing (China); Baoli, Zhu [China National Oil and Gas Exploration and Development Corporation, Beijing (China); Lin, Zheng [CNPC Oil and Gas Control Center, Beijing (China)

    2010-07-01

    When the construction of a pipeline has been completed, the pipeline flooding is done as part of the pipeline commissioning process. This method consists of filling the empty pipe with water or oil. In a pipeline situated in hilly terrain, air entrapped in the fluid causes problems with the flooding process and it is necessary to discharge the accumulated air to address this issue. The aim of this paper is to provide a model for predicting the location and volume of air pockets in a pipeline. This model was developed based on the fundamentals of mass balance and momentum transfer in multiphase flow and was then applied to a pipeline in China and compared with the SCADA data. Results showed a good match between the model's predictions of hydraulic movement and the real data from SCADA. The two flow model developed can predict hydraulic movement during pipeline flooding in a hilly area and thus it can be used to predict water front location and air pocket movement in the pipe.

  20. Beyond the pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Barnsley, J.; Ellis, D.; McIntosh, J.

    1979-12-01

    A study was conducted on the lives of women and their families in Fort Nelson, British Columbia, and Whitehorse, Yukon Territory, two communities which are to be affected by the proposed construction of the Alaska Highway gas pipeline. The womens' socio-economic concerns resulting from the proposed construction were examined by means of interviews with samples of women living in the two communities. Results from the study include descriptions of the communities and their basic services, community planning and housing, women's work in the home and for wages, and the perceived impact of the pipeline on such matters as employment, social services, living costs, business, housing, crime, and the overall community. Recommendations are made to improve the planning process for the pipeline to include the taking into account of womens' needs in such areas as training, health care, housing, and community services. 213 refs., 4 figs., 2 tabs.

  1. Pipeline operators training and certification using thermohydraulic simulators

    Energy Technology Data Exchange (ETDEWEB)

    Barreto, Claudio V.; Plasencia C, Jose [Pontificia Universidade Catolica (PUC-Rio), Rio de Janeiro, RJ (Brazil). Nucleo de Simulacao Termohidraulica de Dutos (SIMDUT); Montalvao, Filipe; Costa, Luciano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The continuous pipeline operators training and certification of the TRANSPETRO's Pipeline National Operations Control Center (CNCO) is an essential task aiming the efficiency and safety of the oil and derivatives transport operations through the Brazilian pipeline network. For this objective, a hydraulic simulator is considered an excellent tool that allows the creation of different operational scenarios for training the pipeline hydraulic behavior as well as for testing the operator's responses to normal and abnormal real time operational conditions. The hydraulic simulator is developed based on a pipeline simulation software that supplies the hydraulic responses normally acquired from the pipeline remote units in the field. The pipeline simulation software has a communication interface system that sends and receives data to the SCADA supervisory system database. Using the SCADA graphical interface to create and to customize human machine interfaces (HMI) from which the operator/instructor has total control of the pipeline/system and instrumentation by sending commands. Therefore, it is possible to have realistic training outside of the real production systems, while acquiring experience during training hours with the operation of a real pipeline. A pilot Project was initiated at TRANSPETRO - CNCO targeting to evaluate the hydraulic simulators advantages in pipeline operators training and certification programs. The first part of the project was the development of three simulators for different pipelines. The excellent results permitted the project expansion for a total of twenty different pipelines, being implemented in training programs for pipelines presently operated by CNCO as well as for the new ones that are being migrated. The main objective of this paper is to present an overview of the implementation process and the development of a training environment through a pipe simulation environment using commercial software. This paper also presents

  2. Crude oil growth impact on pipelines

    International Nuclear Information System (INIS)

    Devries, O.

    2005-01-01

    This paper provided an outline of crude oil production and supply in Canada. Details of oil sands projects in Athabasca, Cold Lake and Peace River were presented. A chart of oil sands growth by major project was provided. A list of new emerging oil sands crude types was also presented along with details of a synthetic bitumen blending synergy. Maps of Western Canadian crude oil markets were provided, along with details of refinery and market demand by crude type. Various pipeline alternatives to new markets were examined, with reference to Enbridge Pipeline's supply and capacity. Details of the Hardisty to U.S Gulf Coast Pipeline and the Edmonton to Prince Rupert Pipeline and its terminal and dock facilities were presented. It was concluded that pipeline capacity and seasonal factors will influence market demand, while linefill, crude types and the quality of the product will influence operational strategies. tabs., figs

  3. Loop Transfer Matrix and Loop Quantum Mechanics

    International Nuclear Information System (INIS)

    Savvidy, George K.

    2000-01-01

    The gonihedric model of random surfaces on a 3d Euclidean lattice has equivalent representation in terms of transfer matrix K(Q i ,Q f ), which describes the propagation of loops Q. We extend the previous construction of the loop transfer matrix to the case of nonzero self-intersection coupling constant κ. We introduce the loop generalization of Fourier transformation which allows to diagonalize transfer matrices, that depend on symmetric difference of loops only and express all eigenvalues of 3d loop transfer matrix through the correlation functions of the corresponding 2d statistical system. The loop Fourier transformation allows to carry out the analogy with quantum mechanics of point particles, to introduce conjugate loop momentum P and to define loop quantum mechanics. We also consider transfer matrix on 4d lattice which describes propagation of memebranes. This transfer matrix can also be diagonalized by using the generalized Fourier transformation, and all its eigenvalues are equal to the correlation functions of the corresponding 3d statistical system. In particular the free energy of the 4d membrane system is equal to the free energy of 3d gonihedric system of loops and is equal to the free energy of 2d Ising model. (author)

  4. Public perceptions of CO2 transportation in pipelines

    International Nuclear Information System (INIS)

    Gough, Clair; O'Keefe, Laura; Mander, Sarah

    2014-01-01

    This paper explores the response by members of the lay public to the prospect of an onshore CO 2 pipeline through their locality as part of a proposed CCS development and presents results from deliberative Focus Groups held along a proposed pipeline route. Although there is a reasonable level of general knowledge about CO 2 across the lay public, understanding of its specific properties is more limited. The main concerns expressed around pipelines focused on five areas: (i) safe operation of the pipeline; (ii) the risks to people, livestock and vegetation arising from the leakage of CO 2 from the pipeline; (iii) the innovative and ‘first of its kind' nature of the pipeline and the consequent lack of operational CO 2 pipelines in the UK to demonstrate the technology; (iv) impacts on coastal erosion at the landfall site; and (v) the potential disruption to local communities during pipeline construction. Participants expressed scepticism over the motivations of CO 2 pipeline developers. Trust that the developer will minimise risk during the route selection and subsequent construction, operation and maintenance of the pipeline is key; building trust within the local community requires early engagement processes, tailored to deliver a variety of engagement and information approaches. - Highlights: • Lay publics express good general knowledge of CO 2 but not of its specific properties. • Key concerns relate to risk and safety and ‘first of a kind' nature of CO 2 pipeline. • Group participants are sceptical about motivations of CO 2 pipeline developers. • Communities' trust in developer is a major element of their risk assessment

  5. Hydrogeological considerations in northern pipeline development. [Permafrost affected by hot or chilled pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Harlan, R L

    1974-11-01

    Some of the hydrogeological implications of construction and operation of oil and gas pipelines in northern regions of Canada are considered in relation to their potential environmental impacts and those factors affecting the security of the pipeline itself. Although the extent to which water in permafrost participates in the subsurface flow regime has not been fully demonstrated, the role of liquid as well as vapor transport in frozen earth materials can be shown from theory to be highly significant; water movement rates in frozen soil are on the same order as those in unsaturated, unfrozen soil. Below 0/sup 0/C, the unfrozen water content in a fine-grained porous medium is dependent on temperature but independent of the total water content. The thermal gradient controls the rate and direction of water movement in permafrost. The groundwater stabilizes the streamflow and in the absence of large lakes provides the main source of flow during the winter. As groundwater is frequently confined by the permafrost, degradation of the permafrost can have significant consequences. The thaw bulb formed around a hot oil pipeline can induce liquefactioned flow of the thawed material. A chilled pipeline could restrict groundwater movement, resulting in buildup of artesian conditions and icings. The liberation and absorption of latent heat on freezing and thawing affects the thermal regime in the ground surface. Recommendations are given for pipeline construction and areas for further study pointed out. (DLC)

  6. Treatment screening for internal corrosion control of PETROBRAS oil pipelines; Selecao de tratamento para controle da corrosao interna de oleodutos da PETROBRAS

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Cynthia de Azevedo; Muller, Eduardo Gullo [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Antunes, Warlley Ligorio; Shioya, Nilce Hiromi; Salvador, Angelica Dias [PETROBRAS, RJ (Brazil). Unidade de Negocios da Bacia de Campos

    2005-07-01

    The use of corrosion inhibitors is spread out in oil and gas industry and is the most common methodology to control pipeline internal corrosion. However, their effectiveness depends on the pipeline material, inhibitor composition, flow type and scale characteristics. When a pipeline has heavy scale deposits, thick bacterial biofilm, or oxygen contamination, the corrosion control via filmic inhibitors is not effective. So, the only way to control internal corrosion of an oil pipeline is to primary identifies the corrosive agent and the main corrosion mechanism. The monitoring of the inhibitor efficiency and the determination of minimal residual concentration to prevent corrosion, are also fundamental. In this paper, is presented the criteria used to identify the main corrosion mechanism of oil pipelines, the treatment proposed in each case and the techniques employed in real time corrosion monitoring. (author)

  7. 49 CFR 192.627 - Tapping pipelines under pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Tapping pipelines under pressure. 192.627 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.627 Tapping pipelines under pressure. Each tap made on a pipeline under pressure must be performed by a crew qualified to make...

  8. The case history of the first pipeline installed in the Arctic and subsequent developments

    International Nuclear Information System (INIS)

    Brown, R.J.

    1990-01-01

    Large reserves of gas and oil have been discovered in Arctic areas which have led various companies to initiate research and development in ways to produce and transport these resources to market. The primary mode of transportation is by pipelines. The main problem is that these areas are remote and transportation systems are long and expensive, especially when considering conventional methods of pipeline construction. The reserves in Canada's Arctic areas are large but, at this time, gas cannot be delivered to market at prices competitive with other gas supplies being completed. This, however, is changing as gas and oil reserves in the lower Arctic have increased, and the combining of a transportation system for both, improves the economics for their development. This paper discusses some of the initial works which have been completed to the stage of an actual pipeline installation, and the planned techniques envisioned for future field developments and for long distance transmission systems

  9. Diagnostics and reliability of pipeline systems

    CERN Document Server

    Timashev, Sviatoslav

    2016-01-01

    The book contains solutions to fundamental problems which arise due to the logic of development of specific branches of science, which are related to pipeline safety, but mainly are subordinate to the needs of pipeline transportation.          The book deploys important but not yet solved aspects of reliability and safety assurance of pipeline systems, which are vital aspects not only for the oil and gas industry and, in general, fuel and energy industries , but also to virtually all contemporary industries and technologies. The volume will be useful to specialists and experts in the field of diagnostics/ inspection, monitoring, reliability and safety of critical infrastructures. First and foremost, it will be useful to the decision making persons —operators of different types of pipelines, pipeline diagnostics/inspection vendors, and designers of in-line –inspection (ILI) tools, industrial and ecological safety specialists, as well as to researchers and graduate students.

  10. Characterization and Validation of Transiting Planets in the TESS SPOC Pipeline

    Science.gov (United States)

    Twicken, Joseph D.; Caldwell, Douglas A.; Davies, Misty; Jenkins, Jon Michael; Li, Jie; Morris, Robert L.; Rose, Mark; Smith, Jeffrey C.; Tenenbaum, Peter; Ting, Eric; Wohler, Bill

    2018-06-01

    Light curves for Transiting Exoplanet Survey Satellite (TESS) target stars will be extracted and searched for transiting planet signatures in the Science Processing Operations Center (SPOC) Science Pipeline at NASA Ames Research Center. Targets for which the transiting planet detection threshold is exceeded will be processed in the Data Validation (DV) component of the Pipeline. The primary functions of DV are to (1) characterize planets identified in the transiting planet search, (2) search for additional transiting planet signatures in light curves after modeled transit signatures have been removed, and (3) perform a comprehensive suite of diagnostic tests to aid in discrimination between true transiting planets and false positive detections. DV data products include extensive reports by target, one-page summaries by planet candidate, and tabulated transit model fit and diagnostic test results. DV products may be employed by humans and automated systems to vet planet candidates identified in the Pipeline. TESS will launch in 2018 and survey the full sky for transiting exoplanets over a period of two years. The SPOC pipeline was ported from the Kepler Science Operations Center (SOC) codebase and extended for TESS after the mission was selected for flight in the NASA Astrophysics Explorer program. We describe the Data Validation component of the SPOC Pipeline. The diagnostic tests exploit the flux (i.e., light curve) and pixel time series associated with each target to support the determination of the origin of each purported transiting planet signature. We also highlight the differences between the DV components for Kepler and TESS. Candidate planet detections and data products will be delivered to the Mikulski Archive for Space Telescopes (MAST); the MAST URL is archive.stsci.edu/tess. Funding for the TESS Mission has been provided by the NASA Science Mission Directorate.

  11. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  12. Pipeline dreams face up to reality

    International Nuclear Information System (INIS)

    Ryan, Orla

    1999-01-01

    This article gives details of two gas pipelines which are expected to be built in Turkey to meet the estimated demand for gas. The Bluestream joint ENI/Gasprom project pipeline will convey Russian gas across the Black Sea to Turkey, and the PSG joint Bechtel/General Electric venture will bring gas from Turkmenistan to Turkey across the Caspian Sea. Construction of the pipelines and financing aspects are discussed. (uk)

  13. Cost reducing factors in effective pipeline piling structure design and construction in Alberta's thermal SAGD gathering pipeline systems

    Energy Technology Data Exchange (ETDEWEB)

    Farrokhzad, M.A. [IMV Projects, Calgary, AB (Canada)

    2008-10-15

    Oil sands steam assisted gravity drainage (SAGD) gathering pipeline systems are typically arranged so that above-ground steam pipeline and production pipelines lay next to each other on the same steel structure. Longitudinal and lateral loads build up in the pipeline supports, and the loads are consistently changing until pipeline temperatures reach a steady state condition. SAGD pipelines are required to have enough flexibility to absorb thermal expansion or contraction movements. However, most pipeline engineers only consider upper and lower temperature limits in the design of steel structures and pilings. This paper examined the effect of considering both the thermal gradient and time factor in designing supports for pipelines. The study examined how the factors impacted on standard load calculations and pile sizings. Sixteen stress analysis models for steam and production lines were prepared and designated thermal gradients were introduced to each model. Longitudinal and lateral loads caused by thermal gradient movements were calculated for all supports. The models were analyzed and absolute values for longitudinal and lateral loads were recorded. Results of the study showed that engineers do not necessarily need to rely on maximum temperatures as the condition that results in maximum longitudinal and lateral loads on supports. It was concluded that costs related to pipeline construction can be significantly reduced by considering the effects of thermal gradients in stress analyses and load calculations. 5 refs., 14 figs.

  14. Security of pipeline facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.C. [Alberta Energy and Utilities Board, Calgary, AB (Canada); Van Egmond, C.; Duquette, L. [National Energy Board, Calgary, AB (Canada); Revie, W. [Canada Centre for Mineral and Energy Technology, Ottawa, ON (Canada)

    2005-07-01

    This working group provided an update on provincial, federal and industry directions regarding the security of pipeline facilities. The decision to include security issues in the NEB Act was discussed as well as the Pipeline Security Management Assessment Project, which was created to establish a better understanding of existing security management programs as well as to assist the NEB in the development and implementation of security management regulations and initiatives. Amendments to the NEB were also discussed. Areas of pipeline security management assessment include physical safety management; cyber and information security management; and personnel security. Security management regulations were discussed, as well as implementation policies. Details of the Enbridge Liquids Pipelines Security Plan were examined. It was noted that the plan incorporates flexibility for operations and is integrated with Emergency Response and Crisis Management. Asset characterization and vulnerability assessments were discussed, as well as security and terrorist threats. It was noted that corporate security threat assessment and auditing are based on threat information from the United States intelligence community. It was concluded that the oil and gas industry is a leader in security in North America. The Trans Alaska Pipeline Incident was discussed as a reminder of how costly accidents can be. Issues of concern for the future included geographic and climate issues. It was concluded that limited resources are an ongoing concern, and that the regulatory environment is becoming increasingly prescriptive. Other concerns included the threat of not taking international terrorism seriously, and open media reporting of vulnerability of critical assets, including maps. tabs., figs.

  15. Estimation of efficiency of hydrotransport pipelines polyurethane coating application in comparison with steel pipelines

    Science.gov (United States)

    Aleksandrov, V. I.; Vasilyeva, M. A.; Pomeranets, I. B.

    2017-10-01

    The paper presents analytical calculations of specific pressure loss in hydraulic transport of the Kachkanarsky GOK iron ore processing tailing slurry. The calculations are based on the results of the experimental studies on specific pressure loss dependence upon hydraulic roughness of pipelines internal surface lined with polyurethane coating. The experiments proved that hydraulic roughness of polyurethane coating is by the factor of four smaller than that of steel pipelines, resulting in a decrease of hydraulic resistance coefficients entered into calculating formula of specific pressure loss - the Darcy-Weisbach formula. Relative and equivalent roughness coefficients are calculated for pipelines with polyurethane coating and without it. Comparative calculations show that hydrotransport pipelines polyurethane coating application is conductive to a specific energy consumption decrease in hydraulic transport of the Kachkanarsky GOC iron ore processing tailings slurry by the factor of 1.5. The experiments were performed on a laboratory hydraulic test rig with a view to estimate the character and rate of physical roughness change in pipe samples with polyurethane coating. The experiments showed that during the following 484 hours of operation, roughness changed in all pipe samples inappreciably. As a result of processing of the experimental data by the mathematical statistics methods, an empirical formula was obtained for the calculation of operating roughness of polyurethane coating surface, depending on the pipeline operating duration with iron ore processing tailings slurry.

  16. Development of high productivity pipeline girth welding

    International Nuclear Information System (INIS)

    Yapp, David; Liratzis, Theocharis

    2010-01-01

    The trend for increased oil and gas consumption implies a growth of long-distance pipeline installations. Welding is a critical factor in the installation of pipelines, both onshore and offshore, and the rate at which the pipeline can be laid is generally determined by the speed of welding. This has resulted in substantial developments in pipeline welding techniques. Arc welding is still the dominant process used in practice, and forge welding processes have had limited successful application to date, in spite of large investments in process development. Power beam processes have also been investigated in detail and the latest laser systems now show promise for practical application. In recent years the use of high strength steels has substantially reduced the cost of pipeline installation, with X70 and X80 being commonly used. This use of high strength pipeline produced by thermomechanical processing has also been researched. They must all meet three requirments, high productivity, satisfactory weld properties, and weld quality

  17. Sea water pipeline for nuclear power plant

    International Nuclear Information System (INIS)

    Ueno, Ken-ichi.

    1992-01-01

    Heating coils, for example, are wound around sea water pipelines as a heater. The outer wall surface of the sea water pipelines is heated by the heating coils. The inner wall surfaces of the sea water pipelines can be warmed to higher than a predetermined temperature by heating the outer wall surfaces to die out marine organisms deposited at the inner surfaces. Further, thermocouples for the external wall and the internal wall are disposed so that the temperature at the inner wall surface of the sea water pipelines can be controlled. Further, a temperature keeping material is disposed at the external surface of the sea water system pipelines. With such a constitution, the marine organisms deposited on the internal wall surface of the sea water system pipelines are died out to suppress the deposition amount of the marine organisms. Accordingly, the maintenance and the operation reliability is improved after maintenance. (I.N.)

  18. Black powder removal in a Mexico gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Morrow, John R. [TDW Services, Inc., New Castle, DE (United States); Drysdale, Colin; Warterfield, Bob D. [T.D.Williamson, Inc., Tulsa, OK (United States)

    2008-07-01

    This paper focuses on the cleaning methodology and operational constrains involved with the removal of black powder in a high pressure natural gas transmission pipeline. In this case, the accumulation of black powder along the pipeline system over the seven year period since it was put into service was creating significant problems in the areas of maintenance, customer relations, and cost to the pipeline operator due to clogging of filters, reduced gas flow, and penalties as result of non-compliant delivery contracts. The pipeline cleaning project consisted of running cleaning pigs or scrappers with batches of cleaning solution through each section of the pipeline while dealing with such factors as three (3) pipeline section lengths in excess of 160 kms (100 miles), gas flow velocity fluctuations, shutdowns, and gas delivery schedule requirements. The cleaning program for the entire pipeline system included the use of chemical and diesel based cleaning solution, running multiple cleaning pigs, liquid injection and separation system, mobile storage tanks, various equipment and personnel for logistical support. Upon completion of the cleaning program, the level of black powder and other solids in all pipeline sections was reduced to approximately 0.5% liquid/solid ratio and the pipeline system returned to normal optimum operation. (author.

  19. New territory for NGL pipelines

    International Nuclear Information System (INIS)

    Turner, C.L.; Billings, F.E.

    1994-01-01

    Even though the NGL pipeline industry appears mature, new geographic territory exists for expansion of NGL pipelines. However, the most fertile territory that must be pursued is the collective opportunities to better link the existing NGL industry. Associations like the Gas Processors Association can not perform the role demanded by a need to share information between the links of the chain on a more real time basis. The Association can not substitute for picking up the phone or calling a meeting of industry participants to discuss proposed changes in policies and procedures. All stakeholders must participate in squeezing out the inefficiencies of the industry. Some expansion and extension of NGL pipelines will occur in the future without ownership participation or commitments from the supply and demand businesses. However, significant expansions linking new supply sources and demand markets will only be made as the supply and demand businesses share long-term strategies and help define the pipeline opportunity. The successful industries of the twenty-first century will not be dominated by a single profitable sector, but rather by those industries which foster cooperation as well as competition. A healthy NGL industry will be comprised of profitable supply businesses and profitable demand businesses, linked together by profitable pipeline businesses

  20. Anchoring protein crystals to mounting loops with hydrogel using inkjet technology.

    Science.gov (United States)

    Shinoda, Akira; Tanaka, Yoshikazu; Yao, Min; Tanaka, Isao

    2014-11-01

    X-ray crystallography is an important technique for structure-based drug discovery, mainly because it is the only technique that can reveal whether a ligand binds to the target protein as well as where and how it binds. However, ligand screening by X-ray crystallography involves a crystal-soaking experiment, which is usually performed manually. Thus, the throughput is not satisfactory for screening large numbers of candidate ligands. In this study, a technique to anchor protein crystals to mounting loops by using gel and inkjet technology has been developed; the method allows soaking of the mounted crystals in ligand-containing solution. This new technique may assist in the design of a fully automated drug-screening pipeline.

  1. Millennium Pipeline Presentation : a new northeast passage

    International Nuclear Information System (INIS)

    Wolnik, J.

    1997-01-01

    Routes of the proposed Millennium Pipeline project were presented. The pipeline is to originate at the Empress gas field in Alberta and link up to eastern markets in the United States. One of the key advantages of the pipeline is that it will have the lowest proposed rates from Empress to Chicago and through links via affiliates to New York and other eastern markets. It will include 380 miles of new 36-inch pipeline and have a capacity of 650 million cubic feet per day. In many instances it will follow existing rights-of-way. The pipeline is expected to be in service for the 1999 winter heating season. The project sponsors are Columbia Gas Transmission, CMS Energy, MCN Energy, and Westcoast Energy. 6 figs

  2. Accuracy Limitations of Pipelined ADCs

    NARCIS (Netherlands)

    Quinn, P.J.; Roermund, van A.H.M.

    2005-01-01

    In this paper, the key characteristics of the main errors which affect the performance of a switched capacitor pipelined ADC are presented and their effects on the ADC transfer characteristics demonstrated. Clear and concise relationships are developed to aid optimized design of the pipeline ADC and

  3. Managing the market risk in pipeline capacity positions

    International Nuclear Information System (INIS)

    Simard, T.S.

    1998-01-01

    Managing the risk involved in adding new pipeline capacity was explored in this presentation. Topics discussed included: (1) pipeline capacity positions as basis swaps, (2) physical capacity versus basis transactions, (3) managing the market price risk in a capacity position, and (4) sharing of pipeline market risk. Pipeline owners were advised to recognize that pipeline capacity carries significant market price risk, that basis markets can sometimes be more volatile than outright markets, and to treat physical capacity market risk the same way as one would treat a financial basis position. 2 figs

  4. The Bakou-Ceyhan pipeline: paradoxes and coherence of the USA strategy of pipelines

    International Nuclear Information System (INIS)

    Jafalian, A.

    2004-01-01

    In 2002, the construction of the Bakou-Ceyhan pipeline, from the Caspian Sea to the Mediterranean Sea, is begun, in spite of the the controversies of industrialists against politicians and experts. The diplomatic USA activity in favor this pipeline largely contributes to the problems solution. The author presents the USA policy and strategy in the region, the economic constraints and the negotiations. (A.L.B.)

  5. 77 FR 32631 - Lion Oil Trading & Transportation, Inc., Magnolia Pipeline Company, and El Dorado Pipeline...

    Science.gov (United States)

    2012-06-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12-13-000] Lion Oil... of the Commission's Rules of Practice and Procedure, 18 CFR 385.202 (2011), Lion Oil Trading & Transportation, Inc., Magnolia Pipeline Company, and El Dorado Pipeline Company, collectively, Lion Companies...

  6. Pipeline investigation report : crude oil pipeline-third party damage : Trans Mountain Pipeline LP 610 millimetre-diameter crude oil pipeline : kilometre post 3.10, Westridge dock transfer line, Burnaby, British Columbia

    International Nuclear Information System (INIS)

    2009-03-01

    This report discussed an oil spill which occurred in July 2007 when a contractor's excavator bucket punctured a pipeline during the excavation of a trench for a new storm sewer line at a location in Burnaby, British Columbia (BC). The puncture caused the release of approximately 234 cubic meters of crude oil, which flowed into Burrard Inlet Bay via a storm sewer system. Eleven houses were sprayed with crude oil, and many other properties required restoration. Approximately 250 residents left their homes. While emergency workers and firefighters responding to the incident were sprayed with crude oil, no explosions, fires, or injuries occurred. The report provided details of studies conducted to determine the placement of the sewer line, as well as attempts made by the contractors to determine the lateral connection of the crude oil pipeline. Discrepancies between the location of the pipeline design drawing and its actual location on other construction drawings were also noted by the contractor. Twenty-four minutes after the rupture, the terminal was fully isolated and the drain-down of the pipeline was completed within an hour. The cause of the accident was attributed to inaccurate construction drawings and inadequate communications between contractors and consulting companies. 3 figs

  7. Permanent cathodic protection monitoring systems for offshore pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Britton, Jim [Deepwater Corrosion Services Inc., Houston, TX (United States)

    2009-07-01

    Historically offshore pipeline cathodic protection monitoring has relied on the use of portable survey techniques. This has typically relied on ROV assisted or surface deployed survey methods. These methods have been shown to have technical as well as economic shortcomings, this is particularly true of buried offshore pipelines where accuracy is always questionable. As more focus is being placed on offshore pipeline integrity, it was time for a new method to emerge. The technology discussed involves the retro-placement of permanent clamp-on monitors onto the pipeline which can measure pipeline to seawater potential as well as current density. The sensors can be interrogated locally using light powered subsea voltage readouts. Application of the technology can be either during pipeline construction, during installation of life extension CP systems, or during routine subsea pipeline interventions. The new method eliminates the need for long cables or expensive acoustic or modulated data transfer and provides all the information required to fully verify CP system performance, thus eliminating the need for expensive close-interval surveys. Some deployment case histories will be presented along with feasibility of application on deep water pipelines and comparative economics. (author)

  8. Surface wave propagation effects on buried segmented pipelines

    Directory of Open Access Journals (Sweden)

    Peixin Shi

    2015-08-01

    Full Text Available This paper deals with surface wave propagation (WP effects on buried segmented pipelines. Both simplified analytical model and finite element (FE model are developed for estimating the axial joint pullout movement of jointed concrete cylinder pipelines (JCCPs of which the joints have a brittle tensile failure mode under the surface WP effects. The models account for the effects of peak ground velocity (PGV, WP velocity, predominant period of seismic excitation, shear transfer between soil and pipelines, axial stiffness of pipelines, joint characteristics, and cracking strain of concrete mortar. FE simulation of the JCCP interaction with surface waves recorded during the 1985 Michoacan earthquake results in joint pullout movement, which is consistent with the field observations. The models are expanded to estimate the joint axial pullout movement of cast iron (CI pipelines of which the joints have a ductile tensile failure mode. Simplified analytical equation and FE model are developed for estimating the joint pullout movement of CI pipelines. The joint pullout movement of the CI pipelines is mainly affected by the variability of the joint tensile capacity and accumulates at local weak joints in the pipeline.

  9. Assessing and preparing a pipeline for in line inspection

    Energy Technology Data Exchange (ETDEWEB)

    Payne, Larry [T.D. Williamson Inc., Tulsa, OK (United States)

    2003-07-01

    In today's pipeline environment, operators around the world face new and emerging state and federal regulations requiring validation of their pipelines' integrity. In line inspection, or smart pigging, is generally the preferred methodology used to investigate metal loss and corrosion in pipelines. Although many pipelines can accommodate smart pigging, there are many pipelines that cannot, for various reasons. Those reasons can vary from not having pig launchers and receivers installed on the line to impassable bends or restrictions and general cleanliness of the pipeline itself. Pipeline cleanliness, more times than not, is one of the main reasons for inaccurate in line inspection data gathering or failed smart pig runs. (author)

  10. The Dangers of Pipeline Thinking: How the School-to-Prison Pipeline Metaphor Squeezes out Complexity

    Science.gov (United States)

    McGrew, Ken

    2016-01-01

    In this essay Ken McGrew critically examines the "school-to-prison pipeline" metaphor and associated literature. The origins and influence of the metaphor are compared with the origins and influence of the competing "prison industrial complex" concept. Specific weaknesses in the "pipeline literature" are examined.…

  11. 78 FR 5866 - Pipeline Safety: Annual Reports and Validation

    Science.gov (United States)

    2013-01-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0319] Pipeline Safety: Annual Reports and Validation AGENCY: Pipeline and Hazardous Materials... 2012 gas transmission and gathering annual reports, remind pipeline owners and operators to validate...

  12. 78 FR 70033 - Encana Marketing (USA) Inc. v. Rockies Express Pipeline LLC; Notice of Complaint

    Science.gov (United States)

    2013-11-22

    ... Marketing (USA) Inc. v. Rockies Express Pipeline LLC; Notice of Complaint Take notice that on November 15... Commission (Commission), 18 CFR 385.206, Encana Marketing (USA) Inc. (Encana Marketing or Complainant), filed... Rockies Express has unlawfully denied Encana Marketing's request to make changes to the primary delivery...

  13. Location of leaks in pressurized underground pipelines

    International Nuclear Information System (INIS)

    Eckert, E.G.; Maresca, J.W. Jr.

    1993-01-01

    Millions of underground storage tanks (UST) are used to store petroleum and other chemicals. The pressurized underground pipelines associated with USTs containing petroleum motor fuels are typically 2 in. in diameter and 50 to 200 ft in length. These pipelines typically operate at pressures of 20 to 30 psi. Longer lines, with diameters up to 4 in., are found in some high-volume facilities. There are many systems that can be used to detect leaks in pressurized underground pipelines. When a leak is detected, the first step in the remediation process is to find its location. Passive-acoustic measurements, combined with advanced signal-processing techniques, provide a nondestructive method of leak location that is accurate and relatively simple, and that can be applied to a wide variety of pipelines and pipeline products

  14. Economic evaluation of CO2 pipeline transport in China

    International Nuclear Information System (INIS)

    Zhang Dongjie; Wang Zhe; Sun Jining; Zhang Lili; Li Zheng

    2012-01-01

    Highlights: ► We build a static hydrodynamic model of CO 2 pipeline for CCS application. ► We study the impact on pressure drop of pipeline by viscosity, density and elevation. ► We point out that density has a bigger impact on pressure drop than viscosity. ► We suggest dense phase transport is preferred than supercritical state. ► We present cost-optimal pipeline diameters for different flowrates and distances. - Abstract: Carbon capture and sequestration (CCS) is an important option for CO 2 mitigation and an optimized CO 2 pipeline transport system is necessary for large scale CCS implementation. In the present work, a hydrodynamic model for CO 2 pipeline transport was built up and the hydrodynamic performances of CO 2 pipeline as well as the impacts of multiple factors on pressure drop behavior along the pipeline were studied. Based on the model, an economic model was established to optimize the CO 2 pipeline transport system economically and to evaluate the unit transport cost of CO 2 pipeline in China. The hydrodynamic model results show that pipe diameter, soil temperature, and pipeline elevation change have significant influence on the pressure drop behavior of CO 2 in the pipeline. The design of pipeline system, including pipeline diameter and number of boosters etc., was optimized to achieve a lowest unit CO 2 transport cost. In regarding to the unit cost, when the transport flow rate and distance are between 1–5 MtCO 2 /year and 100–500 km, respectively, the unit CO 2 transport cost mainly lies between 0.1–0.6 RMB/(tCO 2 km) and electricity consumption cost of the pipeline inlet compressor was found to take more than 60% of the total cost. The present work provides reference for CO 2 transport pipeline design and for feasibility evaluation of potential CCS projects in China.

  15. 77 FR 2606 - Pipeline Safety: Random Drug Testing Rate

    Science.gov (United States)

    2012-01-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0004] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  16. 75 FR 9018 - Pipeline Safety: Random Drug Testing Rate

    Science.gov (United States)

    2010-02-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2010-0034] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  17. 77 FR 34458 - Pipeline Safety: Requests for Special Permit

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0112] Pipeline Safety: Requests for Special Permit AGENCY: Pipeline and Hazardous Materials... BreitBurn Energy Company LP, two natural gas pipeline operators, seeking relief from compliance with...

  18. 78 FR 14877 - Pipeline Safety: Incident and Accident Reports

    Science.gov (United States)

    2013-03-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2013-0028] Pipeline Safety: Incident and Accident Reports AGENCY: Pipeline and Hazardous Materials... PHMSA F 7100.2--Incident Report--Natural and Other Gas Transmission and Gathering Pipeline Systems and...

  19. Regulatory reform for natural gas pipelines: The effect on pipeline and distribution company share prices

    Science.gov (United States)

    Jurman, Elisabeth Antonie

    1997-08-01

    The natural gas shortages in the 1970s focused considerable attention on the federal government's role in altering energy consumption. For the natural gas industry these shortages eventually led to the passage of the Natural Gas Policy Act (NGPA) in 1978 as part of the National Energy Plan. A series of events in the decade of the 1980s has brought about the restructuring of interstate natural gas pipelines which have been transformed by regulators and the courts from monopolies into competitive entities. This transformation also changed their relationship with their downstream customers, the LDCs, who no longer had to deal with pipelines as the only merchants of gas. Regulatory reform made it possible for LDCs to buy directly from producers using the pipelines only for delivery of their purchases. This study tests for the existence of monopoly rents by analyzing the daily returns of natural gas pipeline and utility industry stock price data from 1982 to 1990, a period of regulatory reform for the natural gas industry. The study's main objective is to investigate the degree of empirical support for claims that regulatory reforms increase profits in the affected industry, as the normative theory of regulation expects, or decrease profits, as advocates of the positive theory of regulation believe. I also test Norton's theory of risk which predicts that systematic risk will increase for firms undergoing deregulation. Based on a sample of twelve natural gas pipelines, and 25 utilities an event study concept was employed to measure the impact of regulatory event announcements on daily natural gas pipeline or utility industry stock price data using a market model regression equation. The results of this study provide some evidence that regulatory reforms did not increase the profits of pipeline firms, confirming the expectations of those who claim that excess profits result from regulation and will disappear, once that protection is removed and the firms are operating in

  20. Monitoring device for the reactor pipelines

    International Nuclear Information System (INIS)

    Fukumoto, Akira.

    1983-01-01

    Purpose: To enable rapid and accurate operator's monitoring for the state of pipelines in a BWR type reactor. Constitution: Specific symbols are attached respectively to a fluid supply source constituting the pipelines of a nuclear reactor facility, a plurality of fluid passing points and equipments to be supplied with the fluid, and a symmetrical matrix comprising these symbols in rows and columns is constituted. Then, a matrix is prepared based on detection signals for the states of the liquid supply source, equipments to be supplied with fluid and pipeline equipments by rendering the matrix elements between the signals expressing the state capable of passing the fluid as 1 and the matrix elements between the signals expressing the state incapable of passing the fluid as 0 . The matrix thus prepared in a signal procession circuit and a matrix in a memory circuit previously storing the matrix expressing the normal state of the pipelines are compared to judge the state of the pipelines in a short time and with no misjudging. (Moriyama, K.)

  1. Loop kinematics

    International Nuclear Information System (INIS)

    Migdal, A.A.

    1982-01-01

    Basic operators acting in the loop space are introduced. The topology of this space and properties of the Stokes type loop functionals are discussed. The parametrically invariant loop calculus developed here is used in the loop dynamics

  2. Effort problem of chemical pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Okrajni, J.; Ciesla, M.; Mutwil, K. [Silesian Technical University, Katowice (Poland)

    1998-12-31

    The problem of the technical state assessment of the chemical pipelines working under mechanical and thermal loading has been shown in the paper. The pipelines effort after the long time operating period has been analysed. Material geometrical and loading conditions of the crack initiation and crack growth process in the chosen object has been discussed. Areas of the maximal effort have been determined. The material structure charges after the long time operating period have been described. Mechanisms of the crack initiation and crack growth in the pipeline elements have been analysed and mutual relations between the chemical and mechanical influences have been shown. (orig.) 16 refs.

  3. CPL: Common Pipeline Library

    Science.gov (United States)

    ESO CPL Development Team

    2014-02-01

    The Common Pipeline Library (CPL) is a set of ISO-C libraries that provide a comprehensive, efficient and robust software toolkit to create automated astronomical data reduction pipelines. Though initially developed as a standardized way to build VLT instrument pipelines, the CPL may be more generally applied to any similar application. The code also provides a variety of general purpose image- and signal-processing functions, making it an excellent framework for the creation of more generic data handling packages. The CPL handles low-level data types (images, tables, matrices, strings, property lists, etc.) and medium-level data access methods (a simple data abstraction layer for FITS files). It also provides table organization and manipulation, keyword/value handling and management, and support for dynamic loading of recipe modules using programs such as EsoRex (ascl:1504.003).

  4. World pipeline work set for rapid growth

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports on international pipeline construction which has entered a fast-growth period, accelerated by the new political and economic realities around the world and increasing demand for natural gas, crude oil and refined petroleum products. Many projects are under way or in planning for completion in the mid- to late 1990s in Europe, South America, Asia and the Middle East. Pipeline And Gas Journal's projection calls for construction or other work on 30,700 miles of new natural gas, crude oil and refined products pipelines in the 1992-93 period outside Canada and the U.S. These projects will cost an estimated $30 billion-plus. Natural gas pipelines will comprise most of the mileage, accounting for almost 23,000 miles at an estimated cost of $26.3 billion. Products pipelines, planned or under construction, will add another 5,800 miles at a cost of $2.8 billion. Crude oil pipelines, at a minimum, will total 1,900 new miles at a cost of slightly under $1 billion

  5. Modeling and monitoring of pipelines and networks advanced tools for automatic monitoring and supervision of pipelines

    CERN Document Server

    Torres, Lizeth

    2017-01-01

    This book focuses on the analysis and design of advanced techniques for on-line automatic computational monitoring of pipelines and pipe networks. It discusses how to improve the systems’ security considering mathematical models of the flow, historical flow rate and pressure data, with the main goal of reducing the number of sensors installed along a pipeline. The techniques presented in the book have been implemented in digital systems to enhance the abilities of the pipeline network’s operators in recognizing anomalies. A real leak scenario in a Mexican water pipeline is used to illustrate the benefits of these techniques in locating the position of a leak. Intended for an interdisciplinary audience, the book addresses researchers and professionals in the areas of mechanical, civil and control engineering. It covers topics on fluid mechanics, instrumentation, automatic control, signal processing, computing, construction and diagnostic technologies.

  6. Environmental impact analysis; the example of the proposed Trans-Alaska Pipeline

    Science.gov (United States)

    Brew, David A.

    1974-01-01

    The environmental impact analysis made as required by the National Environmental Policy Act of 1969 for the proposed trans-Alaska pipeline included consideration of the (1) technologically complex and geographically extensive proposed project, (2) extremely different physical environments across Alaska along the proposed route and elsewhere in Alaska and in Canada along alternative routes, (3) socioeconomic environment of the State of Alaska, and (4) a wide variety of alternatives. The analysis was designed specifically to fit the project and environment that would be affected. The environment was divided into two general parts--natural physical systems and superposed socioeconomic systems--and those parts were further divided into discipline-oriented systems or components that were studied and analyzed by scientists of the appropriate discipline. Particular attention was given to potential feedback loops in the impact network and to linkages between the project's impacting effects and the environment. The results of the analysis as reported in the final environmental impact statement were that both unavoidable and threatened environmental impacts would result from construction, operation, and maintenance of the proposed pipeline system and the developments related to it. The principal unavoidable effects would be (1) disturbances of terrain, fish and wildlife habitat, and human environs, (2) the results of the discharge of effluent from the tanker-ballast-treatment facility into Port Valdez and of some indeterminate amount of oil released into the ocean from tank-cleaning operations at sea, and (3) the results associated with increased human pressures of all kinds on the environment. Other unavoidable effects would be those related to increase of State and Native Corporation revenues, accelerated cultural change of the Native population, and extraction of the oil and gas resource. The main threatened environmental effects would all be related to unintentional oil

  7. Remotely operated closure device for a pipeline with a fixed pipeline flange

    International Nuclear Information System (INIS)

    Westendorf, H.

    1987-01-01

    The remotely operated closure is set by suspension centring on the circumference of a blank flange on the fixed pipeline flange to be closed. By operating a central actuating mechanism at the closure, the clamping levers are adjusted so that the blank flange is clamped to the pipeline flange and the two flanges are pressed together. The spring-loaded clamping levers are particularly suitable for actuating the closure with the pliers of a manipulator of a large cell. (DG) [de

  8. 76 FR 11853 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-03-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0027] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... a 24-inch mainline natural gas pipeline, 595 feet in length. The first segment of the special permit...

  9. 78 FR 65429 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2013-10-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0041] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials...-0041 Williams Gas Pipeline 49 CFR 192.150........ To authorize the extension Company, LLC (WGP). of a...

  10. Lessons Learned from Developing and Operating the Kepler Science Pipeline and Building the TESS Science Pipeline

    Science.gov (United States)

    Jenkins, Jon M.

    2017-01-01

    The experience acquired through development, implementation and operation of the KeplerK2 science pipelines can provide lessons learned for the development of science pipelines for other missions such as NASA's Transiting Exoplanet Survey Satellite, and ESA's PLATO mission.

  11. Pipeline capacity and heavy oil markets

    International Nuclear Information System (INIS)

    Scott, G.R.

    1993-01-01

    Aspects of transporting heavy crude to markets from Canadian sources are discussed, with reference to pipeline expansion, western Canadian crude supply, and exports to various Petroleum Administration for Defense Districts (PADDs) in the USA. Pipeline expansions have been proposed by Interprovincial Pipeline, Trans Mountain Pipeline, Rangeland, and Wascana, and some of these proposals are in the review stage. Western Canadian crude supply is expected to peak at 1.9 million bbl/d in 1996. An increase in heavy crude supply is expected but this increase will not be sufficient to offset a decline in light crude supply. Adequate pipeline capacity should exist with the Interprovincial expansion volume of 170,000 bbl/d and the Trans Mountain expansion of 38,000 bbl/d forecast to be in place by 1995. Canadian crude exports to the USA have steadily increased since 1989, and heavy crude exports have grown an average of 20,000 bbl/d each year. In PADD Region IV, oil production is declining and ca 20,000 bbl/d of heavy crude will be needed by the year 2000; additional pipeline capacity will be required. In PADD Region II, Canadian heavy crude imports are ca 390,000 bbl/d and further market opportunities exist, after the Interprovincial expansion is complete. When the various combinations of possible pipeline expansions or reversals are considered, a range of heavy crude near-term growth potentials is obtained in which Canadian heavy oil would displace offshore heavy oil supplied to USA refineries. This potential is seen to range from 35,000 bbl/d to 200,000 bbl/d. 7 refs., 20 figs., 3 tabs

  12. Atomistic simulations of the formation of -component dislocation loops in α-zirconium

    Energy Technology Data Exchange (ETDEWEB)

    Dai, Cong, E-mail: dai.cong@queensu.ca; Balogh, Levente; Yao, Zhongwen; Daymond, Mark R., E-mail: mark.daymond@queensu.ca

    2016-09-15

    The formation of -component dislocation loops in α-Zr is believed to be responsible for the breakaway irradiation growth experimentally observed under high irradiation fluences. However, while -loop growth is well described by existing models, the atomic mechanisms responsible for the nucleation of -component dislocation loops are still not clear. In the present work, both interstitial and vacancy -type dislocation loops are initially equilibrated at different temperatures. Cascades simulations in the vicinity of the -type loops are then performed by selecting an atom as the primary knock-on atoms (PKAs) with different kinetic energies, using molecular dynamics simulations. No -component dislocation loop was formed in cascades simulations with a 10 keV PKA, but -component interstitial loops were observed after the interaction between discontinuous 50 keV PKAs and pre-existing -type interstitial loops. The comparisons of cascades simulations in volumes having pre-existing -type interstitial and vacancy loops suggest that the reaction between the PKAs and -type interstitial loops is responsible for the formation of -component interstitial loops.

  13. 49 CFR 192.513 - Test requirements for plastic pipelines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Test requirements for plastic pipelines. 192.513 Section 192.513 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Test requirements for plastic pipelines. (a) Each segment of a plastic pipeline must be tested in...

  14. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  15. Interconnection of subsystems in closed-loop systems

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Poulsen, Niels Kjølstad

    2009-01-01

    -Jabr-Bongiorno-Kucera (YJBK) parameterization. The dual YJBK transfer function is applied in connection with the closed-loop stability analysis. The primary YJBK parameterization is applied in connection with design of controllers. Further, it is shown how it is possible to obtain a direct estimation of a connected sub...

  16. UNRAVELLING THE COMPONENTS OF A MULTI-THERMAL CORONAL LOOP USING MAGNETOHYDRODYNAMIC SEISMOLOGY

    Energy Technology Data Exchange (ETDEWEB)

    Prasad, S. Krishna; Jess, D. B. [Astrophysics Research Centre, School of Mathematics and Physics, Queen’s University Belfast, Belfast, BT7 1NN (United Kingdom); Klimchuk, J. A. [Heliophysics Division, NASA Goddard Space Flight Center, Greenbelt, MD, 20771 (United States); Banerjee, D., E-mail: krishna.prasad@qub.ac.uk [Indian Institute of Astrophysics, II Block Koramangala, Bengaluru 560034 (India)

    2017-01-10

    Coronal loops, constituting the basic building blocks of the active Sun, serve as primary targets to help understand the mechanisms responsible for maintaining multi-million Kelvin temperatures in the solar and stellar coronae. Despite significant advances in observations and theory, our knowledge on the fundamental properties of these structures is limited. Here, we present unprecedented observations of accelerating slow magnetoacoustic waves along a coronal loop that show differential propagation speeds in two distinct temperature channels, revealing the multi-stranded and multithermal nature of the loop. Utilizing the observed speeds and employing nonlinear force-free magnetic field extrapolations, we derive the actual temperature variation along the loop in both channels, and thus are able to resolve two individual components of the multithermal loop for the first time. The obtained positive temperature gradients indicate uniform heating along the loop, rather than isolated footpoint heating.

  17. 76 FR 21423 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-04-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0063] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... application is for two 30-inch segments, segments 3 and 4, of the TPL 330 natural gas pipeline located in St...

  18. 75 FR 67807 - Pipeline Safety: Emergency Preparedness Communications

    Science.gov (United States)

    2010-11-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... is issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities... Gas Pipeline Systems. Subject: Emergency Preparedness Communications. Advisory: To further enhance the...

  19. 76 FR 65778 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-10-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: 12,120. Frequency of Collection: On occasion. 2. Title: Recordkeeping for Natural Gas Pipeline... investigating incidents. Affected Public: Operators of natural gas pipeline systems. Annual Reporting and...

  20. The great pipeline debate : the Minister of everything

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    This article described the challenges facing Trans-Canada Pipelines (TCPL) in the 1950s regarding the construction of a pipeline to deliver gas to central Canadian markets. Alberta had been granted gas export permits, and the proposed pipeline was financed primarily by American interests. In addition, TCPL had difficulties with several competing proposals to move gas east from Alberta. There was also opposition to TCPL's original route which was through American territory. When the pipeline was rerouted through rugged Precambrian Shield, private-sector financiers balked at the additional costs. During the Great Pipeline debate in 1956, federal Minister C.D. Howe encouraged TCPL and its competitors to merge and put a bill before Parliament to create a Crown corporation to build and own the Canadian Shield portion of the line, leasing it back to TCPL. The first president of TCPL was Eldon Tanner, member of Alberta's Legislative Assembly. He remained at the helm until the pipeline was completed. Industrialist Frank McMahon who participated in drilling activities in British Columbia and at Turner Valley, Alberta, also promoted a plan to complete the construction of the Westcoast Transmission pipeline from the Peace River, Canada's first large natural-gas pipeline. 4 figs

  1. The Independence Pipeline project : ANR's supply link - Independence Pipeline, Transco's market link

    International Nuclear Information System (INIS)

    Persells, T.

    1998-01-01

    An overview of the Independence Pipeline project was presented. The project offers access from Chicago to the U.S. Midwest market, as well as to Ontario via MichCon, Consumers Power, Great Lakes and Panhandle. The project has three components: ANR's Supply Link, the Independence Pipeline and Transco's MarketLink. The three components are budgeted at $ 1.332 billion dollars and projected for completion between Nov 1999 and Nov 2000. Each component (services, access advantages, market links, rates, storage services, etc ) are described separately. figs

  2. 76 FR 45904 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... at U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration, 1200...: On Occasion. Title: Record Keeping for Natural Gas Pipeline Operators. OMB Control Number: 2137-0049...

  3. 75 FR 13807 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-03-23

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... of Transportation, Pipeline and Hazardous Materials Safety Administration, 1200 New Jersey Avenue, SE...: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements (One Rule). The Notice of Proposed...

  4. Multi-Criteria Decision Making Models for Water Pipelines

    OpenAIRE

    El Chanati, Hisham; El-Abbasy, Mohammed S.; Mosleh, Fadi; Senouci, Ahmed; Abouhamad, Mona; Gkountis, Iason; Zayed, Tarek; Al-Derham, Hassan

    2016-01-01

    The deterioration of water pipelines leads to impaired water quality, increased breakage rate, and reduced hydraulic capacity. The planning of maintenance programs for water pipelines is essential to minimize health and safety concerns and ensure an adequate supply of water in a safe, cost-effective, reliable, and sustainable manner. It is essential to assess the performance of water pipelines to assist municipalities in planning inspection and rehabilitation programs for their pipelines. Sev...

  5. Design of a pressurized water loop heated by electric resistances

    International Nuclear Information System (INIS)

    Ribeiro, S.V.G.

    1981-01-01

    A pressurized water loop design is presented. Its operating pressure is 420 psi and we seek to simulate qualitatively some thermo-hydraulic phenomena of PWR reactors. The primary circuit simulator consists basically of two elements: 1)the test section housing 16 electric resistences dissipating a total power of 100 Kw; 2)the loop built of SCH40S 304L steel piping, consisting of the pump, a heat exchanger and the pressurizer. (Author) [pt

  6. Natural circulation studies in a LBE loop for a wide range of temperature

    International Nuclear Information System (INIS)

    Borgohain, A.; Srivastava, A.K.; Jana, S.S.; Maheshwari, N.K.; Kulkarni, R.D.; Vijayan, P.K.; Tewari, R.; Ram, A. Maruthi; Jha, S.K.

    2016-01-01

    Highlights: • A high temperature Lead Bismuth Eutectic loop named as Kilo Temperature Loop (KTL) has been made. • Natural circulation experimental studies were carried out and reported in the range of 200–780 °C. • The experiments at high temperature were carried in inert atmosphere to avoid oxidation of the loop material. • Theoretical studies are carried out to simulate the loop with natural circulation in primary as well as in the secondary side. • The predictions of the code LeBENC used to simulate the natural circulation in the loop are compared with the experimental results. - Abstract: Lead–Bismuth Eutectic (LBE) is increasingly getting more attention as a coolant for advanced reactor systems. It is also the primary coolant of the Compact High Temperature Reactor (CHTR) being designed at Bhabha Atomic Research Centre (BARC). A high temperature liquid metal loop named as Kilo Temperature Loop (KTL) has been installed at BARC for thermal hydraulics, instrument development and material related studies. Natural circulation experimental studies were carried out for the power range of 200–1200 W in the loop. The corresponding LBE flow rate is calculated to be in the range of 0.075–0.12 kg/s. Transient studies for start-up of natural circulation in the loop, loss of heat sink and step power change have also been carried out. The maximum temperature of the loop operated so far is 1100 °C. A computer code named LeBENC has been developed at BARC to simulate the natural circulation characteristics in closed loops. The salient features of the code include ability to handle non-uniform diameter components, axial thermal conduction in fluid and heat losses from the piping to the environment. The code has been modified to take into account of two natural circulation loops in series so that the natural cooling by argon gas in the secondary side of the loop can be simulated. This paper deals with the description of the loop and its operation. The various

  7. Corrosion behavior of API 5L-X80 Pipeline steel for natural gas pipeline

    International Nuclear Information System (INIS)

    Mohd Asyadi Azam Mohd Abid; Imai, Hachiro

    2007-01-01

    Natural energy problem, including the environmental aspects had changes into certain circumstances in recent years and natural gas has been a focus of constant attention from the viewpoint of energy efficiency and pollution free. From that kind of background, pipeline construction for petroleum and natural gas were considerate as energy infrastructure maintenance plan. Based on the clarification of Asian Pipeline Project (1997-2007) centered in Japan, international pipeline is needed as the natural gas is mainly transported from gas field in Russia and Middle East to consumer country such as Japan etc. It used in severe condition such as cold district and sea. In the meantime, pipeline steel is not just received damages by earth crust fluctuation and corrosion, but also suffered from the corrosion caused by anions that were dissolved in sea and groundwater. The diversification of dispersion and consumption structure of natural gas supply acceptance base are seen regarding, that made the needs of the storing are rising and dealt with the quantitative spatial expansion of the demand. By that, corrosion resistance, not only the hardness, tough, weldability, corrosiveness gas environment is extremely required. (author)

  8. Distributed acoustic sensing for pipeline monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Hill, David; McEwen-King, Magnus [OptaSense, QinetiQ Ltd., London (United Kingdom)

    2009-07-01

    Optical fibre is deployed widely across the oil and gas industry. As well as being deployed regularly to provide high bandwidth telecommunications and infrastructure for SCADA it is increasingly being used to sense pressure, temperature and strain along buried pipelines, on subsea pipelines and downhole. In this paper we present results from the latest sensing capability using standard optical fibre to detect acoustic signals along the entire length of a pipeline. In Distributed Acoustic Sensing (DAS) an optical fibre is used for both sensing and telemetry. In this paper we present results from the OptaSense{sup TM} system which has been used to detect third party intervention (TPI) along buried pipelines. In a typical deployment the system is connected to an existing standard single-mode fibre, up to 50km in length, and was used to independently listen to the acoustic / seismic activity at every 10 meter interval. We will show that through the use of advanced array processing of the independent, simultaneously sampled channels it is possible to detect and locate activity within the vicinity of the pipeline and through sophisticated acoustic signal processing to obtain the acoustic signature to classify the type of activity. By combining spare fibre capacity in existing buried fibre optic cables; processing and display techniques commonly found in sonar; and state-of-the-art in fibre-optic distributed acoustic sensing, we will describe the new monitoring capabilities that are available to the pipeline operator. Without the expense of retrofitting sensors to the pipeline, this technology can provide a high performance, rapidly deployable and cost effective method of providing gapless and persistent monitoring of a pipeline. We will show how this approach can be used to detect, classify and locate activity such as; third party interference (including activity indicative of illegal hot tapping); real time tracking of pigs; and leak detection. We will also show how an

  9. Transient leak detection in crude oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Beushausen, R.; Tornow, S.; Borchers, H. [Nord-West Oelleitung, Wilhelmshaven (Germany); Murphy, K.; Zhang, J. [Atmos International Ltd., Manchester (United Kingdom)

    2004-07-01

    Nord-West Oelleitung (NWO) operates 2 crude oil pipelines from Wilhemshaven to Koln and Hamburg respectively. German regulations for transporting flammable substances stipulate that 2 independent continuously working procedures be used to detect leaks. Leak detection pigs are used routinely to complement the surveillance system. This paper described the specific issues of transient leak detection in crude oil pipelines. It was noted that traditional methods have failed to detect leaks that occur immediately after pumps are turned on or off because the pressure wave generated by the transient dominates the pressure wave that results from the leak. Frequent operational changes in a pipeline are often accompanied by an increased number of false alarms and failure to detect leaks due to unsteady operations. NWO therefore decided to have the Atmos statistical pipeline leak detection (SPLD) system installed on their pipelines. The key to the SPLD system is the sequential probability ratio test. Comprehensive data validation is performed following reception of pipeline data from the supervisory control and data acquisition (SCADA) system. The validated data is then used to calculate the corrected flow imbalance, which is fed into the SPRT to determine if there is an increase in the flow imbalance. Pattern recognition is then used to distinguish a leak from operational changes. The SPLD is unique because it uses 3 computational pipeline monitoring methods simultaneously, namely modified volume balance, statistical analysis, and pressure and flow monitoring. The successful installation and testing of the SPLD in 2 crude oil pipelines was described along with the main difficulties associated with transient leaks. Field results were presented for both steady-state and transient conditions. 5 refs., 2 tabs., 16 figs.

  10. Seismic vulnerability of natural gas pipelines

    International Nuclear Information System (INIS)

    Lanzano, Giovanni; Salzano, Ernesto; Santucci de Magistris, Filippo; Fabbrocino, Giovanni

    2013-01-01

    This work deals with the analysis of the interaction of earthquakes with pipelines transporting and distributing natural gas for industrial and civil use. To this aim, a new large data-set of seismic information classified on the basis of selected seismological, geotechnical and structural parameters is presented and analyzed. Particular attention is devoted to continuous pipelines under strong ground shaking, which is the geotechnical effect due to passage of waves in soil. Results are provided in terms of the likelihood of the loss of containment with respect to Peak Ground Velocity (PGV), a seismic intensity parameter which may be easily retrieved either from local authorities and public databases or from site dependent hazard analysis. Fragility functions and seismic intensity threshold values for the failure and for the loss of containment of gas from pipeline systems are also given. The obtained functions can be easily implemented in existing codes and guidelines for industrial risk assessment, land-use planning, and for the design of public distribution network, with specific reference to Natural—Technological interaction (Na-Tech). -- Highlights: • The seismic vulnerability of natural gas pipelines is analyzed. • A collection of data for pipelines damaged by earthquake is given. • Damage states and risk states for pipelines are defined. • Consequence-based fragility formulations for the loss of containment are given • Seismic threshold values for public authority, risk assessment and gas distribution are shown

  11. Outlook '98 - Gas and oil pipelines

    International Nuclear Information System (INIS)

    Curtis, B.

    1998-01-01

    Due to rising North American demand, especially by the United States, by the end of 1997 there were plans to build 15 new pipelines over the next three years, at an estimated cost of $17 billion. Canada''s proximity to the United States, combined with huge Canadian reserves, and the fact that Canada already supplies some 15 per cent of U.S. requirements, makes Canada the obvious choice for filling future demand. This explains why most, if not all, current pipeline expansion projects are targeting markets in the U.S. Market forces will determine which of the projects will actually go forward. From the point of view of the Canadian Energy Pipeline Association pipeline regulatory reform, pipeline safety, integrity and climate change will be the Association''s key concerns during 1998. To that end, the Association is cooperating with the National Energy Board in a multi-million dollar study of stress corrosion cracking. The Association has also developed a Manual of Recommended Practices for the use of member companies to assist them to tailor stress corrosion cracking practices to their own operations. Meeting Canada''s commitment at the Kyoto Conference for greenhouse gas emissions of six per cent below 1990 levels by the year 2008 to 2012 (in effect a 25 per cent reduction from the level anticipated in the year 2000), a very difficult task according to industry experts, is also among the high priority items on the pipeline industry''s agenda for 1998

  12. Pipeline modeling and assessment in unstable slopes

    Energy Technology Data Exchange (ETDEWEB)

    Caceres, Carlos Nieves [Oleoducto Central S.A., Bogota, Cundinamarca (Colombia); Ordonez, Mauricio Pereira [SOLSIN S.A.S, Bogota, Cundinamarca (Colombia)

    2010-07-01

    The OCENSA pipeline system is vulnerable to geotechnical problems such as faults, landslides or creeping slopes, which are well-known in the Andes Mountains and tropical countries like Colombia. This paper proposes a methodology to evaluate the pipe behaviour during the soil displacements of slow landslides. Three different cases of analysis are examined, according to site characteristics. The process starts with a simplified analytical model and develops into 3D finite element numerical simulations applied to the on-site geometry of soil and pipe. Case 1 should be used when the unstable site is subject to landslides impacting significant lengths of pipeline, pipeline is straight, and landslide is simple from the geotechnical perspective. Case 2 should be used when pipeline is straight and landslide is complex (creeping slopes and non-conventional stabilization solutions). Case 3 should be used if the pipeline presents vertical or horizontal bends.

  13. Validation of pig operations through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Tolmasquim, Sueli Tiomno [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil); Nieckele, Angela O. [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Engenharia Mecanica

    2005-07-01

    In the oil industry, pigging operations in pipelines have been largely applied for different purposes: pipe cleaning, inspection, liquid removal and product separation, among others. An efficient and safe pigging operation requires that a number of operational parameters, such as maximum and minimum pressures in the pipeline and pig velocity, to be well evaluated during the planning stage and maintained within stipulated limits while the operation is accomplished. With the objective of providing an efficient tool to assist in the control and design of pig operations through pipelines, a numerical code was developed, based on a finite difference scheme, which allows the simulation of two fluid transient flow, like liquid-liquid, gas-gas or liquid-gas products in the pipeline. Modules to automatically control process variables were included to employ different strategies to reach an efficient operation. Different test cases were investigated, to corroborate the robustness of the methodology. To validate the methodology, the results obtained with the code were compared with a real liquid displacement operation of a section of the OSPAR oil pipeline, belonging to PETROBRAS, with 30'' diameter and 60 km length, presenting good agreement. (author)

  14. JGI Plant Genomics Gene Annotation Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Shu, Shengqiang; Rokhsar, Dan; Goodstein, David; Hayes, David; Mitros, Therese

    2014-07-14

    Plant genomes vary in size and are highly complex with a high amount of repeats, genome duplication and tandem duplication. Gene encodes a wealth of information useful in studying organism and it is critical to have high quality and stable gene annotation. Thanks to advancement of sequencing technology, many plant species genomes have been sequenced and transcriptomes are also sequenced. To use these vastly large amounts of sequence data to make gene annotation or re-annotation in a timely fashion, an automatic pipeline is needed. JGI plant genomics gene annotation pipeline, called integrated gene call (IGC), is our effort toward this aim with aid of a RNA-seq transcriptome assembly pipeline. It utilizes several gene predictors based on homolog peptides and transcript ORFs. See Methods for detail. Here we present genome annotation of JGI flagship green plants produced by this pipeline plus Arabidopsis and rice except for chlamy which is done by a third party. The genome annotations of these species and others are used in our gene family build pipeline and accessible via JGI Phytozome portal whose URL and front page snapshot are shown below.

  15. Energy geopolitics and Iran-Pakistan-India gas pipeline

    International Nuclear Information System (INIS)

    Verma, Shiv Kumar

    2007-01-01

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this pipeline for India

  16. Energy geopolitics and Iran-Pakistan-India gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Verma, Shiv Kumar [Political Geography Division, Center for International Politics, Organization and Disarmament, School of International Studies, Jawaharlal Nehru University, New Delhi 110067 (India)

    2007-06-15

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this pipeline for India

  17. Energy geopolitics and Iran-Pakistan-India gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Verma, Shiv Kumar [Political Geography Division, Center for International Politics, Organization and Disarmament, School of International Studies, Jawaharlal Nehru University, New Delhi 110067 (India)]. E-mail: vermajnu@gmail.com

    2007-06-15

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this

  18. ORAC-DR: A generic data reduction pipeline infrastructure

    Science.gov (United States)

    Jenness, Tim; Economou, Frossie

    2015-03-01

    ORAC-DR is a general purpose data reduction pipeline system designed to be instrument and observatory agnostic. The pipeline works with instruments as varied as infrared integral field units, imaging arrays and spectrographs, and sub-millimeter heterodyne arrays and continuum cameras. This paper describes the architecture of the pipeline system and the implementation of the core infrastructure. We finish by discussing the lessons learned since the initial deployment of the pipeline system in the late 1990s.

  19. East, West German gas pipeline grids linked

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Ruhrgas AG, Essen, has started up the first large diameter gas pipeline linking the gas grids of former East and West Germany. Ruhrgas last month placed in service a 40 in., 70 km line at Vitzeroda, near Eisenach, linking a new Ruhrgas pipeline in Hesse state with a 330 km gas pipeline built last year in Thuringia and Saxony states by Erdgasversorgungs GmbH (EVG), Leipzig. The new link enables pipeline operator EVG to receive 70 bcf/year of western European gas via Ruhrgas, complementing the 35 bcf/year of gas coming from the Commonwealth of Independent States via Verbundnetz Gas AG (VNG), Leipzig

  20. Managing changes of location classes of gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cunha, Sergio B; Sousa, Antonio Geraldo de [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Most of the gas pipeline design codes utilize a class location system, where the design safety factor and the hydrostatic test factor are determined according to the population density in the vicinities of the pipeline route. Consequently, if an operator is requested or desires to maintain an existing gas pipeline in compliance with its design code, it will reduce the operational pressure or replace pipe sections to increase the wall thickness whenever a change in location class takes place. This article introduces an alternative methodology to deal with changes in location classes of gas pipelines. Initially, selected codes that utilize location class systems are reviewed. Afterwards, a model for the area affected by an ignition following a natural gas pipeline leak is described. Finally, a methodology to determine the MAOP and third part damage mitigation measures for gas transport pipelines that underwent changes in location class is presented. (author)

  1. Proof of pipeline strength based on measurements of inspection pigs; Festigkeitsnachweis von Pipelines aufgrund der Messergebnisse von Pruefmolchen

    Energy Technology Data Exchange (ETDEWEB)

    De la Camp, H.J.; Feser, G.; Hofmann, A.; Wolf, B.; Schmidt, H. [TUeV Sueddeutschland Bau und Betrieb GmbH, Muenchen (Germany); Herforth, H.E.; Juengling, K.H.; Schmidt, W. [TUeV Anlagentechnik GmbH, Berlin-Schoeneberg (Germany). Unternehmensgruppe TUeV Rheinland/Berlin-Brandenburg

    2002-01-01

    The report is aimed at collecting and documenting the state of the art and the extensive know how of experts and pipeline operators with regard to judging the structural integrity of pipelines. In order to assess the actual mechanical strength of pipelines based on measurement results obtained by inspection pigs, guidance is given for future processing, which eventually can be used as a basis for an industry standard. A literature study of the commercially available types of inspection pigs describes and synoptically lists the respective pros and cons. In essence the report comprises besides check lists of operating data for the pipeline and the pig runs mainly the evaluation of defects and respective calculating procedures. Included are recommendations regarding maintenance planning, verification of defects as well as repetition of pig runs. (orig.) [German] Ziel des Berichtes ist die Erfassung und Dokumentation zum derzeitigen Stand der Technik und des vorhandenen umfangreichen Know-how von Sachverstaendigen und Pipelinebetreibern auf dem Gebiet der sicherheitstechnischen Beurteilung von Pipelines. Fuer den Festigkeitsnachweis von Pipelines aufgrund der Messergebnisse von Pruefmolchen wurde ein Leitfaden als Basis fuer die zukuenftige Vorgehensweise erstellt, der eventuell die Grundlage eines normativen Regelwerkes bilden kann. In einer Literaturstudie wurden die auf dem Markt befindlichen Pruefmolchtypen zusammenfassend beschrieben und ihre Vor- und Nachteile tabellarisch gegenuebergestellt und bewertet. Neben der Erstellung von Checklisten fuer notwendige Daten zum Betrieb der Pipeline und der Molchlaeufe bildet die Fehlerbewertung mit entsprechenden Berechnungsverfahren den Hauptteil dieses Berichtes. Hinweise zur Instandhaltungsplanung (Fehlerverifikation und Molchlaufwiederholung) werden gegeben. (orig.)

  2. Autosomal mutations affecting Y chromosome loops in Drosophila melanogaster

    Directory of Open Access Journals (Sweden)

    Petrucci Romano

    2008-04-01

    Full Text Available Abstract Background The Y chromosome of Drosophila melanogaster harbors several genes required for male fertility. The genes for these fertility factors are very large in size and contain conspicuous amounts of repetitive DNA and transposons. Three of these loci (ks-1, kl-3 and kl-5 have the ability to develop giant lampbrush-like loops in primary spermatocytes, a cytological manifestation of their active state in these cells. Y-loops bind a number of non-Y encoded proteins, but the mechanisms regulating their development and their specific functions are still to be elucidated. Results Here we report the results of a screen of 726 male sterile lines to identify novel autosomal genes controlling Y-loop function. We analyzed mutant testis preparations both in vivo and by immunofluorescence using antibodies directed against Y-loop-associated proteins. This screen enabled us to isolate 17 mutations at 15 loci whose wild-type function is required for proper Y-loop morphogenesis. Six of these loci are likely to specifically control loop development, while the others display pleiotropic effects on both loops and meiotic processes such as spermiogenesis, sperm development and maturation. We also determined the map position of the mutations affecting exclusively Y-loop morphology. Conclusion Our cytological screening permitted us to identify novel genetic functions required for male spermatogenesis, some of which show pleiotropic effects. Analysis of these mutations also shows that loop development can be uncoupled from meiosis progression. These data represent a useful framework for the characterization of Y-loop development at a molecular level and for the study of the genetic control of heterochromatin.

  3. Repair methods for damaged pipeline beyond diving depth

    OpenAIRE

    Mohammadi, Keramat

    2011-01-01

    Master's thesis in Offshore Technology Mechanical damage of a subsea pipeline is found as one of the most severe concern in management of pipeline integrity. The need to reach and bring the hydrocarbons from the fields located in deep and ultra-deep waters, imposes the need to improve the technologies and techniques in order to repair any unacceptable damage in pipeline. The main objective of this work is to investigate various methods for repairing a subsea pipeline that has been damaged ...

  4. Two-loop polygon Wilson loops in N = 4 SYM

    International Nuclear Information System (INIS)

    Anastasiou, C.; Brandhuber, A.; Heslop, P.; Spence, B.; Travaglini, G.; Khoze, V.V.

    2009-01-01

    We compute for the first time the two-loop corrections to arbitrary n-gon lightlike Wilson loops in N = 4 supersymmetric Yang-Mills theory, using efficient numerical methods. The calculation is motivated by the remarkable agreement between the finite part of planar six-point MHV amplitudes and hexagon Wilson loops which has been observed at two loops. At n = 6 we confirm that the ABDK/BDS ansatz must be corrected by adding a remainder function, which depends only on conformally invariant ratios of kinematic variables. We numerically compute remainder functions for n = 7,8 and verify dual conformal invariance. Furthermore, we study simple and multiple collinear limits of the Wilson loop remainder functions and demonstrate that they have precisely the form required by the collinear factorisation of the corresponding two-loop n-point amplitudes. The number of distinct diagram topologies contributing to the n-gon Wilson loops does not increase with n, and there is a fixed number of 'master integrals', which we have computed. Thus we have essentially computed general polygon Wilson loops, and if the correspondence with amplitudes continues to hold, all planar n-point two-loop MHV amplitudes in the N = 4 theory.

  5. Europe's gas imports via pipelines. Projects and safety aspects; Europas Gasimporte durch Pipelines. Projekte und Sicherheitsaspekte

    Energy Technology Data Exchange (ETDEWEB)

    Goetz, R.

    2008-08-15

    By the year 2030 Europe's gas imports will have risen to approximately 200 bn m{sup 3}, necessitating the installation of new pipelines and LNG terminals. The largest growth in imports is not expected from Russia but from Africa and the Near East. An analysis of projected pipelines demonstrates these regions' contribution to securing Europe's gas supply. Because they help to establish market dominance or to fend off potential competitors these pipelines also serve corporate strategies. The most reliable supply will continue to come from Norway. By contrast, gas imports via pipelines from North Africa, Russia and the Persian Gulf all carry high risks of approximately the same degree. The greatest risks are associated with gas imports from the Caspian Sea.

  6. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis

    International Nuclear Information System (INIS)

    Mattiozzi, Pierpaolo; Strom, Alexander

    2008-01-01

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE) - the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. Detailed Design was performed with due regard to actual topography and to avoid the possibility of the trenches freezing in winter, the implementation of specific drainage solutions and thermal protection measures

  7. Environmental audit guidelines for pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    Environmental auditing is a form of management control which provides an objective basis by which a company can measure the degree of compliance with environmental regulations. Other benefits of this type of auditing include improved environmental management, furthering communication on environmental issues of concern within the company, and provision of documentation on environmental diligence. A series of environmental audit guidelines for pipelines is presented in the form of lists of questions to be asked during an environmental audit followed by recommended actions in response to those questions. The questions are organized into seven main categories: environmental management and planning; operating procedures; spill prevention; management of wastes and hazardous materials; environmental monitoring; construction of pipelines; and pipeline abandonment, decommissioning and site reclamation

  8. Transport of solid commodities via freight pipeline: freight pipeline technology. Volume II. First year final report. [Slurry, pneumatic, pneumo-capsule, and hydro-capsule

    Energy Technology Data Exchange (ETDEWEB)

    Zandi, I.; Gimm, K.K.

    1976-07-01

    In order to determine the feasibility of pipeline as an intercity freight transportation mode, it was necessary to examine its technological feasibility and reliability. This report describes the technology of the major generic freight pipelines in terms of both historical and current trends and operations. Additionally, it presents a state-of-the-art review of calculating energy requirements of various generic freight pipelines. It was concluded that slurry and pneumatic pipelines are technologically feasible and reliable. There are many commercial installations of both types operating around the world. Based on European experience with pneumo-capsule pipelines for mail delivery and Russian gravel- and sand-transport installations, it appears that a pneumo-capsule pipeline is a technologically feasible and operationally reliable mode for transport of solids. Since no commercial pneumo-capsule pipeline installations yet exist in the U.S., it seems desirable that a service demonstration of the advantages and feasibility of this mode of transport be undertaken to attract the shippers' confidence. Hydro-capsule pipelines are technologically feasible, but its reliability within a commercial environment remains to be tested.

  9. Real-Time Location-Based Rendering of Urban Underground Pipelines

    Directory of Open Access Journals (Sweden)

    Wei Li

    2018-01-01

    Full Text Available The concealment and complex spatial relationships of urban underground pipelines present challenges in managing them. Recently, augmented reality (AR has been a hot topic around the world, because it can enhance our perception of reality by overlaying information about the environment and its objects onto the real world. Using AR, underground pipelines can be displayed accurately, intuitively, and in real time. We analyzed the characteristics of AR and their application in underground pipeline management. We mainly focused on the AR pipeline rendering procedure based on the BeiDou Navigation Satellite System (BDS and simultaneous localization and mapping (SLAM technology. First, in aiming to improve the spatial accuracy of pipeline rendering, we used differential corrections received from the Ground-Based Augmentation System to compute the precise coordinates of users in real time, which helped us accurately retrieve and draw pipelines near the users, and by scene recognition the accuracy can be further improved. Second, in terms of pipeline rendering, we used Visual-Inertial Odometry (VIO to track the rendered objects and made some improvements to visual effects, which can provide steady dynamic tracking of pipelines even in relatively markerless environments and outdoors. Finally, we used the occlusion method based on real-time 3D reconstruction to realistically express the immersion effect of underground pipelines. We compared our methods to the existing methods and concluded that the method proposed in this research improves the spatial accuracy of pipeline rendering and the portability of the equipment. Moreover, the updating of our rendering procedure corresponded with the moving of the user’s location, thus we achieved a dynamic rendering of pipelines in the real environment.

  10. Oil and Natural Gas Pipelines, North America, 2010, Platts

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Oil and Natural Gas Pipeline geospatial data layer contains gathering, interstate, and intrastate natural gas pipelines, crude and product oil pipelines, and...

  11. Australia's changing natural gas and pipeline industry

    International Nuclear Information System (INIS)

    Kimber, M.J.

    1998-01-01

    The future is bright for continued development of Australia's natural gas pipeline infrastructure, as well as for privatization and private energy infrastructure growth. Gas demands are growing and the development of open access principles for all natural gas transmission and distribution pipelines heralds a much more market focused industry. Within the next few years gas-on-gas competition will apply to supply, pipelines, and retail marketing. No longer will operators be able to pass on high costs resulting from inefficiencies to their customers. This article describes the changing Australian gas industry, evaluates the drivers for change and looks at ways the industry is responding to new regulatory regimes and the development and use of new pipeline technology

  12. Sensor and transmitter system for communication in pipelines

    Science.gov (United States)

    Cooper, John F.; Burnham, Alan K.

    2013-01-29

    A system for sensing and communicating in a pipeline that contains a fluid. An acoustic signal containing information about a property of the fluid is produced in the pipeline. The signal is transmitted through the pipeline. The signal is received with the information and used by a control.

  13. Alternative loop rings

    CERN Document Server

    Goodaire, EG; Polcino Milies, C

    1996-01-01

    For the past ten years, alternative loop rings have intrigued mathematicians from a wide cross-section of modern algebra. As a consequence, the theory of alternative loop rings has grown tremendously. One of the main developments is the complete characterization of loops which have an alternative but not associative, loop ring. Furthermore, there is a very close relationship between the algebraic structures of loop rings and of group rings over 2-groups. Another major topic of research is the study of the unit loop of the integral loop ring. Here the interaction between loop rings and group ri

  14. Comparison of Axillary Loop and Straight Grafts Patency and Their Complications for Hemodialylis Access

    Directory of Open Access Journals (Sweden)

    J KHoshnevis

    2011-08-01

    Full Text Available Introduction & Objective: Dialysis vascular access complications are important causes of morbidity in chronic hemodialysis patients. The aim of the present study was a comparison of auxillary loop and atraight grafts patency and its complications for hemodialysis access. Materials & Methods: In this cohort study conducted at Shahid Beheshti Medical University, 58 patients who underwent placement of loop or straight access grafts were included in the study. Demographics, primary and secondary patency rates and complications like thrombosis, infection, bleeding, steal syndrome and other complications were compared in these two groups. The collected data was analyzed by the SPSS statistical software using the chi-square test, t-test, and logistic regression. Results: Thrombosis rates were 51.1% and 53.8% in straight and loop groups respectively (P=0.862, steal syndrome rates were 2.2% and 7.7% in straight and loop groups respectively (P=0.341, psudoanevrism were 11.1% and 23.1% in straight and loop groups respectively (P=0.270, bleeding rates were 4.4% and 0% in straight and loop groups respectively (P=0.439, infection rate were 8.9% and 7.7% in straight and loop groups respectively (P=0.892, and primary patency rate after 1 month were 88.9% and 92.3% respectively (P=0.721, and primary patency rate after 24 month were 31% and 55.5% respectively (P=0.058. Secondary patency rate after 3 month were 75.6% and 92.3% respectively (P=0.189, and secondary patency rate after 24 month were 37.9% and 66.7% respectively (P=0.044. Conclusion: PTFE vascular graft seems to be an appropriate vascular access and is a promising alternative when upper extremity arteriovenous fistulas cannot be constructed. Additionally, there was no significant different between two groups for complications and early patency, but late patency was better in loop group. More study is necessary for final judgment.

  15. Rupture detection device for pipeline in reactor

    International Nuclear Information System (INIS)

    Murakoshi, Toshinori; Kanamori, Shigeru; Shirasawa, Hirofumi.

    1991-01-01

    A difference between each of the pressures in a plurality of pipelines disposed in a shroud a reactor container and a pressure outside of the shroud is detected, thereby enabling safety and reliable detection even for simultaneous rapture and leakage of the pipelines. That is, a difference between the pressure of a steam phase outside of the shroud and a pressure in each of a plurality of low pressure injection pipelines in an emergency core cooling system opened to the inside of the shroud in the reactor container is detected by a difference pressure detector for each of them. Then, an average value for each of the pressure difference is determined, which is compared with the difference pressure obtained from each of the detectors in a comparator. Then, if openings should be caused by rupture, leakage or the like in any of the pipelines, the pressure in that pipeline is lowered to a vicinity of an atmospheric pressure and at the vapor phase pressure at the lowest. If the pressure is compared with the average value by the comparator, a negative difference is caused. Accordingly, an alarming unit generates an alarm based on the pressure difference signal, thereby enabling to specify the failed pipeline and provide an announce of the failure. (I.S.)

  16. GRAVITY PIPELINE TRANSPORT FOR HARDENING FILLING MIXTURES

    Directory of Open Access Journals (Sweden)

    Leonid KROUPNIK

    2015-12-01

    Full Text Available In underground mining of solid minerals becoming increasingly common development system with stowing hardening mixtures. In this case the natural ore array after it is replaced by an artificial excavation of solidified filling mixture consisting of binder, aggregates and water. Such a mixture is prepared on the surface on special stowing complexes and transported underground at special stowing pipelines. However, it is transported to the horizons of a few kilometers, which requires a sustainable mode of motion of such a mixture in the pipeline. Hardening stowing mixture changes its rheological characteristics over time, which complicates the calculation of the parameters of pipeline transportation. The article suggests a method of determining the initial parameters of such mixtures: the status coefficient, indicator of transportability, coefficient of hydrodynamic resistance to motion of the mixture. These indicators characterize the mixture in terms of the possibility to transport it through pipes. On the basis of these indicators is proposed methodology for calculating the parameters of pipeline transport hardening filling mixtures in drift mode when traffic on the horizontal part of the mixture under pressure column of the mixture in the vertical part of the backfill of the pipeline. This technique allows stable operation is guaranteed to provide pipeline transportation.

  17. The radiation safety assessment of the heating loop of district heating reactors

    International Nuclear Information System (INIS)

    Liu Yuanzhong

    1993-01-01

    The district heating reactors are used to supply heating to the houses in cities. The concerned problems are whether the radioactive materials reach the heated houses through heating loop, and whether the safety of the dwellers can be ensured. In order to prevent radioactive materials getting into the heated houses, the district heating reactors have three loops, namely, primary loop, intermediate loop, and heating loop. In the paper, the measures of preventing radioactive materials getting into the heating loop are presented, and the possible sources of the radioactivity in the water of the intermediate loop and the heating loop are given. The regulatory aim limit of radioactive concentration in the water of the intermediate loop is put forward, which is 18.5 Bq/l. Assuming that specific radioactivity of the water of contaminated intermediate loop is up to 18.5 Bq/l, the maximum concentration of radionuclides in water of the heating loop is calculated for the normal operation and the accident of district heating reactor. The results show that the maximum possible concentration is 5.7 x 10 -3 Bq/l. The radiation safety assessment of the heating loop is made out. The conclusions are that the district heating reactors do not bring any harmful impact to the dwellers, and the safety of the dwellers can be safeguarded completely

  18. An image processing pipeline to detect and segment nuclei in muscle fiber microscopic images.

    Science.gov (United States)

    Guo, Yanen; Xu, Xiaoyin; Wang, Yuanyuan; Wang, Yaming; Xia, Shunren; Yang, Zhong

    2014-08-01

    Muscle fiber images play an important role in the medical diagnosis and treatment of many muscular diseases. The number of nuclei in skeletal muscle fiber images is a key bio-marker of the diagnosis of muscular dystrophy. In nuclei segmentation one primary challenge is to correctly separate the clustered nuclei. In this article, we developed an image processing pipeline to automatically detect, segment, and analyze nuclei in microscopic image of muscle fibers. The pipeline consists of image pre-processing, identification of isolated nuclei, identification and segmentation of clustered nuclei, and quantitative analysis. Nuclei are initially extracted from background by using local Otsu's threshold. Based on analysis of morphological features of the isolated nuclei, including their areas, compactness, and major axis lengths, a Bayesian network is trained and applied to identify isolated nuclei from clustered nuclei and artifacts in all the images. Then a two-step refined watershed algorithm is applied to segment clustered nuclei. After segmentation, the nuclei can be quantified for statistical analysis. Comparing the segmented results with those of manual analysis and an existing technique, we find that our proposed image processing pipeline achieves good performance with high accuracy and precision. The presented image processing pipeline can therefore help biologists increase their throughput and objectivity in analyzing large numbers of nuclei in muscle fiber images. © 2014 Wiley Periodicals, Inc.

  19. A computational genomics pipeline for prokaryotic sequencing projects.

    Science.gov (United States)

    Kislyuk, Andrey O; Katz, Lee S; Agrawal, Sonia; Hagen, Matthew S; Conley, Andrew B; Jayaraman, Pushkala; Nelakuditi, Viswateja; Humphrey, Jay C; Sammons, Scott A; Govil, Dhwani; Mair, Raydel D; Tatti, Kathleen M; Tondella, Maria L; Harcourt, Brian H; Mayer, Leonard W; Jordan, I King

    2010-08-01

    New sequencing technologies have accelerated research on prokaryotic genomes and have made genome sequencing operations outside major genome sequencing centers routine. However, no off-the-shelf solution exists for the combined assembly, gene prediction, genome annotation and data presentation necessary to interpret sequencing data. The resulting requirement to invest significant resources into custom informatics support for genome sequencing projects remains a major impediment to the accessibility of high-throughput sequence data. We present a self-contained, automated high-throughput open source genome sequencing and computational genomics pipeline suitable for prokaryotic sequencing projects. The pipeline has been used at the Georgia Institute of Technology and the Centers for Disease Control and Prevention for the analysis of Neisseria meningitidis and Bordetella bronchiseptica genomes. The pipeline is capable of enhanced or manually assisted reference-based assembly using multiple assemblers and modes; gene predictor combining; and functional annotation of genes and gene products. Because every component of the pipeline is executed on a local machine with no need to access resources over the Internet, the pipeline is suitable for projects of a sensitive nature. Annotation of virulence-related features makes the pipeline particularly useful for projects working with pathogenic prokaryotes. The pipeline is licensed under the open-source GNU General Public License and available at the Georgia Tech Neisseria Base (http://nbase.biology.gatech.edu/). The pipeline is implemented with a combination of Perl, Bourne Shell and MySQL and is compatible with Linux and other Unix systems.

  20. 77 FR 19414 - Pipeline Safety: Public Comment on Leak and Valve Studies Mandated by the Pipeline Safety...

    Science.gov (United States)

    2012-03-30

    ... Safety, Regulatory Certainty, and Job Creation Act of 2011 AGENCY: Pipeline and Hazardous Materials.... Background: The recent passage of the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 has... consider upstream and downstream controls, automation, supervisory control and data acquisition systems...

  1. Bauxite slurry pipeline: start up operation

    Energy Technology Data Exchange (ETDEWEB)

    Othon, Otilio; Babosa, Eder; Edvan, Francisco; Brittes, Geraldo; Melo, Gerson; Janir, Joao; Favacho, Orlando; Leao, Marcos; Farias, Obadias [Vale, Rio de Janeiro, RJ (Brazil); Goncalves, Nilton [Anglo Ferrous Brazil S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The mine of Miltonia is located in Paragominas-PA, in the north of Brazil. Bauxite slurry pipeline starts at the Mine of Miltonia and finishes in the draining installation of Alunorte refinery at the port of Barcarena-PA, located approximately 244km away from the mine. The pipeline runs over seven cities and passes below four great rivers stream beds. The system was designed for an underground 24 inches OD steel pipe to carry 9.9 million dry metric tonnes per annum (dMTAs) of 50.5% solid concentration bauxite slurry, using only one pumping station. The system is composed by four storage tanks and six piston diaphragm pumps, supplying a flow of 1680 m3/h. There is a cathodic protection system along the pipeline extension to prevent external corrosion and five pressure monitoring stations to control hydraulic conditions, there is also a fiber optic cable interconnection between pump station and terminal station. Pipeline Systems Incorporated (PSI) was the designer and followed the commissioning program of the start up operations. This paper will describe the beginning of the pipeline operations, technical aspects of the project, the operational experiences acquired in these two years, the faced problems and also the future planning. (author)

  2. 75 FR 4136 - Pipeline Safety: Request To Modify Special Permit

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0377] Pipeline Safety: Request To Modify Special Permit AGENCY: Pipeline and Hazardous... coating on its gas pipeline. DATES: Submit any comments regarding this special permit modification request...

  3. Instrumented Pipeline Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Piro; Michael Ream

    2010-07-31

    This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

  4. Investigation on potential SCC in gas transmission pipeline in China

    Energy Technology Data Exchange (ETDEWEB)

    Jian, S. [Petroleum Univ., Beijing (China); Zupei, Y.; Yunxin, M. [China Petroleum Pipeline Corp., Beijing (China). Science and Technology Center

    2004-07-01

    Stress corrosion cracking (SCC) is a common phenomenon that occurs on the outer surfaces of buried pipelines. This paper investigated aspects of SCC on 3 transmission pipelines on the West-East Gas Pipeline Project in China. The study was comprised of 3 different investigations: (1) an investigation of SCC cases on constructed pipelines; (2) an evaluation of SCC sensitivity of pipeline steels in typical soil environments; and (3) an analysis of soil environments and operation conditions of western pipelines. The study included a review of pipeline corrosion investigations, as well as an examination of pipeline failure cases. Investigative digs were conducted at 21 sites to test soil chemistries. Slow strain rate stress were conducted to evaluate SCC sensitivity of steel pipelines used in China. Potentiodynamic polarization tests were conducted to characterize the electrochemical behaviour of the X70 line pipe steel in different soil environments. Results of the study showed that the environmental conditions in many locations in China contributed to SCC in pipelines. SCC was observed on the surface of X70 steel pipe specimens in both marsh and saline environments. Seasonal temperature changes also contributed additional stress on pipelines. The movement of soil bodies in mountainous areas also contributed to stress and coating damage. It was concluded that proper cathodic protection can alleviate concentrations of local solutions under disbanded coatings. Overprotection of SCC will accelerate the growth of cracks and the degradation of coatings. Samples gathered from the solutions found under the disbanded coatings of pipelines will be used to form part of a reference database for predicting SCC in oil and gas pipelines in the future. 2 refs., 4 tabs., 5 figs.

  5. Reconfiguration of the NRAD delay loop for proposed 1 MW operations

    International Nuclear Information System (INIS)

    Heidel, C.C.; Richards, W.J.; Pruett, D.P.

    1984-01-01

    Neutron radiography is provided by the NRAD reactor facility, which is located beneath the HFEF hot cell. The NRAD reactor is a TRIGA reactor and is operated at a steady-state power level of 250 kw solely for neutron radiography and the development of radiography techniques. When the NRAD facility was designed and constructed, an operating power level of 250 kw was considered to be adequate for obtaining radiographs of the type of specimens envisaged at that time. Since that time a second radiography station was installed and the thickness of the specimens being radiographed is greater than was initially envisaged. In order to decrease exposure times, the reactor power level is to be increased to 1 Mw. The present delay loop can not to be used at 1 Mw operation, because the passage way where the primary piping exits the reactor room must be maintained less than 1 MR/hr. To obtain the needed delay before the primary water exits the reactor room using the present internal delay loop system would require two more delay loops of the same size to be placed in series with the present delay loop. Because the NRAD reactor tank is small this is not possible; therefore, the delay must take place external to the reactor tank. The delay loop will have to be located in a shielded area to allow the decay of N 16 . The best location for the delay tank will be in the east radiography

  6. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  7. Falcon: a highly flexible open-source software for closed-loop neuroscience.

    Science.gov (United States)

    Ciliberti, Davide; Kloosterman, Fabian

    2017-08-01

    Closed-loop experiments provide unique insights into brain dynamics and function. To facilitate a wide range of closed-loop experiments, we created an open-source software platform that enables high-performance real-time processing of streaming experimental data. We wrote Falcon, a C++ multi-threaded software in which the user can load and execute an arbitrary processing graph. Each node of a Falcon graph is mapped to a single thread and nodes communicate with each other through thread-safe buffers. The framework allows for easy implementation of new processing nodes and data types. Falcon was tested both on a 32-core and a 4-core workstation. Streaming data was read from either a commercial acquisition system (Neuralynx) or the open-source Open Ephys hardware, while closed-loop TTL pulses were generated with a USB module for digital output. We characterized the round-trip latency of our Falcon-based closed-loop system, as well as the specific latency contribution of the software architecture, by testing processing graphs with up to 32 parallel pipelines and eight serial stages. We finally deployed Falcon in a task of real-time detection of population bursts recorded live from the hippocampus of a freely moving rat. On Neuralynx hardware, round-trip latency was well below 1 ms and stable for at least 1 h, while on Open Ephys hardware latencies were below 15 ms. The latency contribution of the software was below 0.5 ms. Round-trip and software latencies were similar on both 32- and 4-core workstations. Falcon was used successfully to detect population bursts online with ~40 ms average latency. Falcon is a novel open-source software for closed-loop neuroscience. It has sub-millisecond intrinsic latency and gives the experimenter direct control of CPU resources. We envisage Falcon to be a useful tool to the neuroscientific community for implementing a wide variety of closed-loop experiments, including those requiring use of complex data structures and real

  8. Falcon: a highly flexible open-source software for closed-loop neuroscience

    Science.gov (United States)

    Ciliberti, Davide; Kloosterman, Fabian

    2017-08-01

    Objective. Closed-loop experiments provide unique insights into brain dynamics and function. To facilitate a wide range of closed-loop experiments, we created an open-source software platform that enables high-performance real-time processing of streaming experimental data. Approach. We wrote Falcon, a C++ multi-threaded software in which the user can load and execute an arbitrary processing graph. Each node of a Falcon graph is mapped to a single thread and nodes communicate with each other through thread-safe buffers. The framework allows for easy implementation of new processing nodes and data types. Falcon was tested both on a 32-core and a 4-core workstation. Streaming data was read from either a commercial acquisition system (Neuralynx) or the open-source Open Ephys hardware, while closed-loop TTL pulses were generated with a USB module for digital output. We characterized the round-trip latency of our Falcon-based closed-loop system, as well as the specific latency contribution of the software architecture, by testing processing graphs with up to 32 parallel pipelines and eight serial stages. We finally deployed Falcon in a task of real-time detection of population bursts recorded live from the hippocampus of a freely moving rat. Main results. On Neuralynx hardware, round-trip latency was well below 1 ms and stable for at least 1 h, while on Open Ephys hardware latencies were below 15 ms. The latency contribution of the software was below 0.5 ms. Round-trip and software latencies were similar on both 32- and 4-core workstations. Falcon was used successfully to detect population bursts online with ~40 ms average latency. Significance. Falcon is a novel open-source software for closed-loop neuroscience. It has sub-millisecond intrinsic latency and gives the experimenter direct control of CPU resources. We envisage Falcon to be a useful tool to the neuroscientific community for implementing a wide variety of closed-loop experiments, including those

  9. Evaluation of pipeline defect's characteristic axial length via model-based parameter estimation in ultrasonic guided wave-based inspection

    International Nuclear Information System (INIS)

    Wang, Xiaojuan; Tse, Peter W; Dordjevich, Alexandar

    2011-01-01

    The reflection signal from a defect in the process of guided wave-based pipeline inspection usually includes sufficient information to detect and define the defect. In previous research, it has been found that the reflection of guided waves from even a complex defect primarily results from the interference between reflection components generated at the front and the back edges of the defect. The respective contribution of different parameters of a defect to the overall reflection can be affected by the features of the two primary reflection components. The identification of these components embedded in the reflection signal is therefore useful in characterizing the concerned defect. In this research, we propose a method of model-based parameter estimation with the aid of the Hilbert–Huang transform technique for the purpose of decomposition of a reflection signal to enable characterization of the pipeline defect. Once two primary edge reflection components are decomposed and identified, the distance between the reflection positions, which closely relates to the axial length of the defect, could be easily and accurately determined. Considering the irregular profiles of complex pipeline defects at their two edges, which is often the case in real situations, the average of varied axial lengths of such a defect along the circumference of the pipeline is used in this paper as the characteristic value of actual axial length for comparison purpose. The experimental results of artificial defects and real corrosion in sample pipes were considered in this paper to demonstrate the effectiveness of the proposed method

  10. Natural Circulation Characteristics of a Symmetric Loop under Inclined Conditions

    Directory of Open Access Journals (Sweden)

    Xingtuan Yang

    2014-01-01

    Full Text Available Natural circulation is an important process for primary loops of some marine integrated reactors. The reactor works under inclined conditions when severe accidents happen to the ship. In this paper, to investigate the characteristics of natural circulation, experiments were conducted in a symmetric loop under the inclined angle of 0~45°. A CFD model was also set up to predict the behaviors of the loop beyond the experimental scope. Total circulation flow rate decreases with the increase of inclined angle. Meanwhile one circulation is depressed while the other is enhanced, and accordingly the disparity between the branch circulations arises and increases with the increase of inclined angle. Circulation only takes place in one branch circuit at large inclined angle. Also based on the CFD model, the influences of flow resistance distribution and loop configuration on natural circulation are predicted. The numerical results show that to design the loop with the configuration of big altitude difference and small width, it is favorable to reduce the influence of inclination; however too small loop width will cause severe reduction of circulation ability at large angle inclination.

  11. Pipelines and salmon in northern British Columbia : potential impacts

    International Nuclear Information System (INIS)

    Levy, D.A.

    2009-10-01

    Four pipeline projects have been proposed for northern British Columbia that could threaten the health of the Fraser, Skeena, and Kitimat watersheds. The pipelines will expose salmon to risks on several fronts. Enbridge's Northern Gateway pipeline project has generated the most concern for a several reasons, including the risks to salmon and freshwater habitat from pipeline failures, notably leaks or ruptures. This paper reviewed the salmon resources in affected watersheds; salmon and BC's economy; salmon diversity and abundance; impacts on fish from pipeline construction, operations and failures; behaviours of different petroleum products in fresh water; hydrocarbon toxicity; history of pipeline failures; sabotage and natural disasters; and Canadian case studies. Salmon are already experiencing stresses from forestry, hydro-electricity, transportation, agriculture, mining, mountain pine beetle, climate change and coalbed methane development. Their cumulative impact will dictate the long-term health and viability of salmon. It was concluded that if all of the proposed pipelines were built, they would extend over 4,000 km, crossing more than 1,000 rivers and streams in some of Canada's most productive salmon habitat. During construction, pipeline stream crossings are vulnerable to increased sedimentation, which can degrade salmon habitat. In the event of a spill, the condensate and oil sands products carried in the pipelines are highly toxic to salmon, with serious and lasting adverse impacts on salmon and their habitat. Any decision to approve such a pipeline should be made in recognition of these risks. 73 refs., 5 tabs., 15 figs., 2 appendices.

  12. Structural reliability analysis applied to pipeline risk analysis

    Energy Technology Data Exchange (ETDEWEB)

    Gardiner, M. [GL Industrial Services, Loughborough (United Kingdom); Mendes, Renato F.; Donato, Guilherme V.P. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Quantitative Risk Assessment (QRA) of pipelines requires two main components to be provided. These are models of the consequences that follow from some loss of containment incident, and models for the likelihood of such incidents occurring. This paper describes how PETROBRAS have used Structural Reliability Analysis for the second of these, to provide pipeline- and location-specific predictions of failure frequency for a number of pipeline assets. This paper presents an approach to estimating failure rates for liquid and gas pipelines, using Structural Reliability Analysis (SRA) to analyze the credible basic mechanisms of failure such as corrosion and mechanical damage. SRA is a probabilistic limit state method: for a given failure mechanism it quantifies the uncertainty in parameters to mathematical models of the load-resistance state of a structure and then evaluates the probability of load exceeding resistance. SRA can be used to benefit the pipeline risk management process by optimizing in-line inspection schedules, and as part of the design process for new construction in pipeline rights of way that already contain multiple lines. A case study is presented to show how the SRA approach has recently been used on PETROBRAS pipelines and the benefits obtained from it. (author)

  13. Modeling and Calculation of Dent Based on Pipeline Bending Strain

    Directory of Open Access Journals (Sweden)

    Qingshan Feng

    2016-01-01

    Full Text Available The bending strain of long-distance oil and gas pipelines can be calculated by the in-line inspection tool which used inertial measurement unit (IMU. The bending strain is used to evaluate the strain and displacement of the pipeline. During the bending strain inspection, the dent existing in the pipeline can affect the bending strain data as well. This paper presents a novel method to model and calculate the pipeline dent based on the bending strain. The technique takes inertial mapping data from in-line inspection and calculates depth of dent in the pipeline using Bayesian statistical theory and neural network. To verify accuracy of the proposed method, an in-line inspection tool is used to inspect pipeline to gather data. The calculation of dent shows the method is accurate for the dent, and the mean relative error is 2.44%. The new method provides not only strain of the pipeline dent but also the depth of dent. It is more benefit for integrity management of pipeline for the safety of the pipeline.

  14. The pipeline service obligation under changing LDC purchasing practices

    International Nuclear Information System (INIS)

    Neff, S.J.

    1990-01-01

    Historically, interstate natural gas pipelines served as aggregators and transporters of gas supplies from the producing fields to the city-gate. In turn, local distribution companies (LDCs) bought gas from pipelines at the city-gate under long-term sales contracts and resold the gas to retail customers. Once a pipeline/LDC sales relationship was established through a regulated certificate process, the LDC was assured of gas supply up to the level of its contract demand (CD) at just and reasonable rates until abandonment of the pipeline's sales service obligation was granted by the Federal Energy Regulatory Commission (FERC). During the years of regulated wellhead pricing and limited gas deliverability, pipelines signed long-term take-or-pay contracts with producers to induce them to develop and commit new gas supplies. Those supply cost obligations were reflected in tariff minimum bill provisions. For years, this pipeline/LDC arrangement was mutually beneficial and provided assured firm service. With the load diversity on large interstate pipeline systems and the make-up provisions under take-or-pay clauses, these gas purchase contracts provided supply reliability without negative economic consequence to the pipelines. Then, with the issuance of FERC Order Nos. 380, 436, and 500, LDCs' obligations to purchase gas from pipeline suppliers according to the terms of those long term sales agreements were irrevocably altered. The impacts of those long term sales agreements were irrevocably altered. The impacts of those orders the elimination of minimum bills and the advent of open access transportation caused a serious erosion of the mutual obligations between pipelines and their LDC customers. The result has been a significant loss of pipeline sales markets as LDC customers have chosen alternative supplied, often at the urging of state public utility commissions (PUCs) to lower short-term costs

  15. Analysis of buried pipelines at Kozloduy

    International Nuclear Information System (INIS)

    Asfura, A.

    1999-01-01

    This paper describes the analysis of the buried pipelines at Kozloduy NPP. It involves the description of the studied pipelines, their properties, a detailed description of the methodology applied, and the evaluation of the soil strain field as well as the graphical representation of the results obtained

  16. CFD analysis of onshore oil pipelines in permafrost

    Science.gov (United States)

    Nardecchia, Fabio; Gugliermetti, Luca; Gugliermetti, Franco

    2017-07-01

    Underground pipelines are built all over the world and the knowledge of their thermal interaction with the soil is crucial for their design. This paper studies the "thermal influenced zone" produced by a buried pipeline and the parameters that can influence its extension by 2D-steady state CFD simulations with the aim to improve the design of new pipelines in permafrost. In order to represent a real case, the study is referred to the Eastern Siberia-Pacific Ocean Oil Pipeline at the three stations of Mo'he, Jiagedaqi and Qiqi'har. Different burial depth sand diameters of the pipe are analyzed; the simulation results show that the effect of the oil pipeline diameter on the thermal field increases with the increase of the distance from the starting station.

  17. An optimal open/closed-loop control method with application to a pre-stressed thin duralumin plate

    Science.gov (United States)

    Nadimpalli, Sruthi Raju

    The excessive vibrations of a pre-stressed duralumin plate, suppressed by a combination of open-loop and closed-loop controls, also known as open/closed-loop control, is studied in this thesis. The two primary steps involved in this process are: Step (I) with an assumption that the closed-loop control law is proportional, obtain the optimal open-loop control by direct minimization of the performance measure consisting of energy at terminal time and a penalty on open-loop control force via calculus of variations. If the performance measure also involves a penalty on closed-loop control effort then a Fourier based method is utilized. Step (II) the energy at terminal time is minimized numerically to obtain optimal values of feedback gains. The optimal closed-loop control gains obtained are used to describe the displacement and the velocity of open-loop, closed-loop and open/closed-loop controlled duralumin plate.

  18. Pipeline engineering. 8. rev. and enl. ed.

    International Nuclear Information System (INIS)

    Wagner, W.

    2000-01-01

    Apart from calculating the strength of pipeline components planning and design are the most important tasks on the areas of apparatus manufacturing, fluid engineering, process engineering and thermal engineering. It is therefore necessary that the flow diagrams of a plant are clearly understandable and in accordance with the technical rules even in the early stages of planning. This book concentrates on steel pipeline which are not laid underground but of the type used mostly in industrial applications. The pictures and equations provided can be used for the design of pipelines, tables and diagrams are given to facilitate estimation of elasticity, pipeline pressure losses and insulating thicknesses. An overview of the equations is given at the end of the book. Many examples facilitate learning. (orig.) [de

  19. Alaska-Canada Pipeline Project : getting it done

    Energy Technology Data Exchange (ETDEWEB)

    Brintnell, R. [Enbridge Pipelines Inc., Calgary, AB (Canada)

    2005-07-01

    Enbridge's unique qualifications for the proposed Alaska-Canada pipeline that will extend from Prudhoe Bay, Alaska to Fort Saskatchewan, Alberta was discussed. Enbridge is Canada's largest local distribution company (LDC), handling approximately 14 bcf of natural gas per day through pipeline, processing and marketing. It also operates the world's longest liquids pipeline, delivering more than 2 million barrels per day. The company also has 20 years of operational experience in perma frost regions. The key challenges facing the construction of the proposed new high pressure liquids rich pipeline were discussed with reference to market outlook; cost reduction; U.S. fiscal and regulatory issues; Alaska fiscal contract; and, Canadian regulatory efficiency. A successful project will mean a $15 billion capital expenditure in Canada, $16 billion in government revenues, 12,000 construction work years, and tens of thousands of new jobs. It will also improve Alberta's position as the key energy hub and will increase the utilization of the existing infrastructure. Canadian consumers will benefit from access to a new supply basin and a more secure source of clean-burning natural gas at a cost competitive price. In order to get the project completed, the following requirements must be met: regulatory regimes must be clear and predictable; land access must be ensured in a timely manner; access to skilled human resources, material and equipment must also be ensured to facilitate timely and efficient project implementation; and, the safe and environmentally sound operation of the pipelines must also be ensured. This paper highlighted Canadian regulatory options in terms of the National Energy Board Act, Canadian Environmental Assessment Act, the Yukon Environmental and Socio-Economic Assessment Act, and the Northern Pipeline Act. Enbridge's proposed straddle plant at Fort Saskatchewan was discussed along with inter-connecting pipeline options. Enbridge

  20. Description of the two-loop RELAP5 model of the L-Reactor at the Savannah River Site

    International Nuclear Information System (INIS)

    Cozzuol, J.M.; Davis, C.B.

    1989-12-01

    A two-loop RELAP5 input model of the L-Reactor at the Savannah River Site (SRS) was developed to support thermal-hydraulic analysis of SRS reactors. The model was developed to economically evaluate potential design changes. The primary simplifications in the model were in the number of loops and the detail in the moderator tank. The six loops in the reactor were modeled with two loops, one representing a single loop and the other representing five combined loops. The model has undergone a quality assurance review. This report describes the two-loop model, its limitations, and quality assurance. 29 refs., 18 figs., 10 tabs

  1. Design study on large-scale mercury loop for engineering test of target of high-intensity proton accelerator

    International Nuclear Information System (INIS)

    Hino, Ryutaro; Haga, Katsuhiro; Aita, Hideki; Sekita, Kenji; Sudo, Yukio; Koiso, Kohji; Kaminaga, Masanori; Takahashi, Hiromichi.

    1997-03-01

    A heavy liquid-metal target has been proposed as a representative target of a 5MW-scale neutron source for a neutron scattering facility coupled with a high-intensity proton accelerator. In the report, about mercury considered to be the best material of the heavy liquid-metal target, its properties needed for the design were formulated, and results of research on mercury treatment and of evaluation of heat removal performance on the basis of generating heat obtained by a numerical calculation of a spallation reaction were presented. From these results, a 1.5MW-scale mercury loop which equals to that for the first stage operation of the neutron science program of JAERI was designed conceptually for obtaining design data of the mercury target, and basic flow diagram of the loop and specifications of components were decided: diameter of pipelines flowing mercury at the velocity below 1m/s, power of an electro-magnet pump and structure of a cooler. Through the design, engineering problems were made clear such as selection and development of mercury-resistant materials and optimization of the loop and components for decreasing mercury inventory. (author)

  2. Random walk loop soups and conformal loop ensembles

    NARCIS (Netherlands)

    van de Brug, T.; Camia, F.; Lis, M.

    2016-01-01

    The random walk loop soup is a Poissonian ensemble of lattice loops; it has been extensively studied because of its connections to the discrete Gaussian free field, but was originally introduced by Lawler and Trujillo Ferreras as a discrete version of the Brownian loop soup of Lawler and Werner, a

  3. 78 FR 24309 - Pipeline and Hazardous Materials Safety Administration

    Science.gov (United States)

    2013-04-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration List of Special Permit Applications Delayed AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA..., Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building...

  4. Analysis of severe accidents on fast reactor test loop

    International Nuclear Information System (INIS)

    Cenerini, R.; Verzelletti, G.; Curioni, S.

    1975-01-01

    The Pec reactor is a sodium cooled fast reactor which is being designed for the primary purpose of accomodating closed sodium cooled test loops for the developmental and proof testing of fast reactor fuel assemblies. The test loops are located in the central test region of reactor. The basic function for which the loop is designed is burn-up to failure testing of fuel under advanced performance conditions. It is therefore necessary to design the loop for failure conditions. Basically two types of accidents can occur within the loops: rupture of gas plenum in the fuel pins and coolant starvation. Explosive tests on Pec loop, whose first set is described in this report, are devoted to investigate the effects of an accidental energy release on loop containment. The loop model reproduces in the test section the prototype dimensions in radial scale 1:1. Using a wire explosive charge of 300mm, the height of test section is sufficient for determining the containment capability of the loop that has a nearly constant deformation in a length of. 3-4 time the diameter. The inertial effects of the coolant column are reproduced by two tubes at the extremities of test section, closed with top plugs. Some tests has been performed by wrapping around the test section four layers of steel wire in order to evaluate the influence on the containment of tungsten wire that is foreseen in prototype loop. The influence of the coolant around the loop was evaluated by inserting the model in water. Dummy sub-assemblies was used and explosive substitutes the central rods. Piezoelectric pressure transducers were mounted on the three plugs and radial deformation was measured directly at different height. From experiments performed it resulted the importance of harmonic wires and inertial reaction of external water on loop containment; maximum containable energy is about 50 Cal with E.1 explosive

  5. Putting the coal slurry pipelines to the test

    Energy Technology Data Exchange (ETDEWEB)

    Sauermann, H B

    1978-03-01

    This paper deals with the advantages and disadvantages of coal slurry pipelines and describes coal slurry tests undertaken in three test circuits with 100, 200 and 250 mm diameter pipes. The test results from the test circuits were used to scale-up pressure gradients to larger pipe diameters. The construction and installation of hydraulic transport pipelines is simple and requires a minimum of space. The crossing of rivers, roads, railways or any other obstacles is comparatively easy. The operation, supervision and maintenance of a pipeline is simple since any pipeline can be easily adapted for fully automatic control. For this reason manpower requirements are small resulting in only small increases in operating costs during the life of a pipeline. This is an attractive feature in any economy troubled by inflationary trends. In transporting a commodity such as coal the quantities handled are usually large and the distances are long. The profitability of hydraulic transportation systems benefits from such operating conditions. Even though the various components of a slurry transport system, such as the slurrying facilities at the mine end and the dewatering facilities at the utilization end, are complex, their reliability is high. Against the advantages, the following limitations can be visualized: It is practically impossible to transport solids other than those for which the pipeline was designed; in this regard, road and rail transportation is more versatile. The solids throughput through a pipeline cannot be economically increased beyond its design throughput. Pipelining involves the use of fluids, in most cases water, which in some instances may not be readily available.

  6. Use of Main Loop Isolating Valves (GZZS) in WWER 440

    International Nuclear Information System (INIS)

    Stefanova, A.E.; Gencheva, R.V.; Groudev, P.P.

    2002-01-01

    This paper discusses the usage of Main Loop Isolation Valves in case of Steam Generator Tube Rupture accident in WWER440/V230. A double-ended single pipe break in SG-6 was chosen as representative. In the paper are investigated two cases. In the first one the operator isolates the affected loop by Main Loop Isolation Valves closing and after primary depressurization re-opens them to cooldown the damaged Steam Generator. The second case treats the situation, where Main Loop Isolation Valves fail to close with the necessary operator actions for managing plant recovery. RELAP5/MOD3.2 computer code has been used to simulate the Steam Generator Tube Rupture accident in WWER440 NPP model. This model was developed and validated at Institute for Nuclear Research and Nuclear Energy - Bulgarian Academy of Sciences. The results of analyses presented in this report demonstrate that in the both cases (with or without Main Loop Isolation Valves usage) the operator could bring the plant to stable and safety conditions (Authors)

  7. Pipeline robots with elastic elements

    Directory of Open Access Journals (Sweden)

    A. Matuliauskas

    2002-10-01

    Full Text Available In the article constructions of the pipeline robots with elastic elements are reviewed and the scheme of new original construction is presented. The mathematical models of a robot with one-dimensional vibration exciter with two degrees of freedom were developed and the equations of movement were formed and written. The mathematical model of the pipeline robot with circular elements is formed and its motion equations are presented.

  8. Reasons for decision in the matter of Trans Mountain Pipeline Inc. (formerly Terasen Pipelines (Trans Mountain) Inc.) : tariffs

    International Nuclear Information System (INIS)

    2007-01-01

    In 2006 and 2007 Terasen Pipelines (Trans Mountain) Inc. (now Trans Mountain Pipeline Inc.) submitted a series of applications to the National Energy Board for revisions to the Trans Mountain Tariffs. They were filed in response to apportionment concerns on the Trans Mountain pipeline. Four of the applications involved pronounced and contentious changes to the capacity allocation procedures on the pipeline system. For ease of reference, the Board amalgamated its 4 decisions on these applications into a single document. A map of the Trans Mountain pipeline system as a whole was presented along with a detailed map indicating the delivery locations served by the system in the lower mainland of British Columbia and the state of Washington. The issues considered by the Board in each of these decisions included capacity allocation for Westridge Dock; capacity allocations to export destinations; common carriage requirements; and the need for creating a new barge subcategory. Relevant sections of the National Energy Board Act referred to in the decisions were highlighted. This document also listed the Trans Mountain Tariffs that have introduced notable revisions to the capacity allocation procedures on the system since September 2003. 16 refs., 2 figs., 3 appendices

  9. Experimental and computational analysis of pressure response in a multiphase flow loop

    Science.gov (United States)

    Morshed, Munzarin; Amin, Al; Rahman, Mohammad Azizur; Imtiaz, Syed

    2016-07-01

    The characteristics of multiphase fluid flow in pipes are useful to understand fluid mechanics encountered in the oil and gas industries. In the present day oil and gas exploration is successively inducing subsea operation in the deep sea and arctic condition. During the transport of petroleum products, understanding the fluid dynamics inside the pipe network is important for flow assurance. In this case the information regarding static and dynamic pressure response, pressure loss, optimum flow rate, pipe diameter etc. are the important parameter for flow assurance. The principal aim of this research is to represents computational analysis and experimental analysis of multi-phase (L/G) in a pipe network. This computational study considers a two-phase fluid flow through a horizontal flow loop with at different Reynolds number in order to determine the pressure distribution, frictional pressure loss profiles by volume of fluid (VOF) method. However, numerical simulations are validated with the experimental data. The experiment is conducted in 76.20 mm ID transparent circular pipe using water and air in the flow loop. Static pressure transducers are used to measure local pressure response in multiphase pipeline.

  10. Induced AC voltages on pipelines may present a serious hazard

    International Nuclear Information System (INIS)

    Kirkpatrick, E.L.

    1997-01-01

    The problem of induced AC voltages on pipelines has always been with us. Early pipeline construction consisted of bare steel or cast iron pipe, which was very well grounded. Bell and spigot, mechanical, or dresser-style joint couplings often were used, creating electrically discontinuous pipelines which are less susceptible to AC induction. Although induced AC affects any pipeline parallel to a high-voltage alternating current (HVAC) power line, the effects were not noticeable on bare pipelines. With the advent of welded steel pipelines, modern cathodic protection (CP) methods and materials, and the vastly improved quality of protective coatings, induced AC effects on pipelines have become a significant consideration on many pipeline rights-of-way. In the last two to three decades, one has been seeing much more joint occupancy of the same right-of-way by one or more pipelines and power lines. As the cost of right-of-way and the difficulty in acquisition, particularly in urban areas, have risen, the concept of joint occupancy rights-of-way has become more attractive to many utility companies. Federal and state regulations usually insist on joint-use right-of-way when a utility proposes crossing regulated or publicly owned lands, wherever there is an existing easement. Such joint use allows the induced AC phenomena to occur and may create electrical hazards and interference to pipeline facilities. Underground pipelines are especially susceptible if they are well-coated and electrically isolated for CP

  11. Renormalization of loop functions for all loops

    International Nuclear Information System (INIS)

    Brandt, R.A.; Neri, F.; Sato, M.

    1981-01-01

    It is shown that the vacuum expectation values W(C 1 ,xxx, C/sub n/) of products of the traces of the path-ordered phase factors P exp[igcontour-integral/sub C/iA/sub μ/(x)dx/sup μ/] are multiplicatively renormalizable in all orders of perturbation theory. Here A/sub μ/(x) are the vector gauge field matrices in the non-Abelian gauge theory with gauge group U(N) or SU(N), and C/sub i/ are loops (closed paths). When the loops are smooth (i.e., differentiable) and simple (i.e., non-self-intersecting), it has been shown that the generally divergent loop functions W become finite functions W when expressed in terms of the renormalized coupling constant and multiplied by the factors e/sup -K/L(C/sub i/), where K is linearly divergent and L(C/sub i/) is the length of C/sub i/. It is proved here that the loop functions remain multiplicatively renormalizable even if the curves have any finite number of cusps (points of nondifferentiability) or cross points (points of self-intersection). If C/sub γ/ is a loop which is smooth and simple except for a single cusp of angle γ, then W/sub R/(C/sub γ/) = Z(γ)W(C/sub γ/) is finite for a suitable renormalization factor Z(γ) which depends on γ but on no other characteristic of C/sub γ/. This statement is made precise by introducing a regularization, or via a loop-integrand subtraction scheme specified by a normalization condition W/sub R/(C-bar/sub γ/) = 1 for an arbitrary but fixed loop C-bar/sub γ/. Next, if C/sub β/ is a loop which is smooth and simple except for a cross point of angles β, then W(C/sub β/) must be renormalized together with the loop functions of associated sets S/sup i//sub β/ = ]C/sup i/ 1 ,xxx, C/sup i//sub p/i] (i = 2,xxx,I) of loops C/sup i//sub q/ which coincide with certain parts of C/sub β/equivalentC 1 1 . Then W/sub R/(S/sup i//sub β/) = Z/sup i/j(β)W(S/sup j//sub β/) is finite for a suitable matrix Z/sup i/j

  12. Pipeline leak detection method and control device therefor

    International Nuclear Information System (INIS)

    Bell, D.A.

    1983-01-01

    Leaks may be located in a pipeline by introducing into the pipeline an assembly that includes a pipe-sealing packer unit, a control unit, and a radioactive source shielded from the control unit. The control unit includes a gamma ray detector that controls the sealing and unsealing of the pipe by the packer in response to the detection of radiation exceeding a preset threshold - a detection event. The assembly is pushed through the pipeline by a relatively low fluid pressure behind it. The progress of the assembly through the pipeline may be monitored externally by a gamma ray detector

  13. Optimal hub location in pipeline networks

    Energy Technology Data Exchange (ETDEWEB)

    Dott, D.R.; Wirasinghe, S.C.; Chakma, A. [Univ. of Calgary, Alberta (Canada)

    1996-12-31

    This paper discusses optimization strategies and techniques for the location of natural gas marketing hubs in the North American gas pipeline network. A hub is a facility at which inbound and outbound network links meet and freight is redirected towards their destinations. Common examples of hubs used in the gas pipeline industry include gas plants, interconnects and market centers. Characteristics of the gas pipeline industry which are relevant to the optimization of transportation costs using hubs are presented. Allocation techniques for solving location-allocation problems are discussed. An outline of the research in process by the authors in the field of optimal gas hub location concludes the paper.

  14. Pipeline protection with multi component liquid polyurethane coating systems

    Energy Technology Data Exchange (ETDEWEB)

    Kuprion, Rainer; Hornig, Maja [TIB Chemicals Ag, Mannheim (Germany)

    2009-07-01

    Protective coating systems are one of the major defence mechanisms against corrosion for transmission pipelines, pipes within a refinery or petrochemical processing facilities. More and more pipelines are being constructed for the supply and transmission of gas and oil, each year but, in addition many existing pipelines are approaching an age where inspection reveals the necessity to consider complete refurbishment. However, the number of rehabilitation projects each year is still relatively small. Therefore, in the coming years, a rising need and necessity can be expected, for the owners and operating companies to be faced with the option of either replacing the pipeline or refurbishing of the existing pipeline. If the pipeline is known to have external corrosion, then safe and economic operation should be assured. Rehabilitation should be done before it is too late in order to ensure its future integrity and operational life. Rehabilitation of pipelines has been both the economic solution and, more significantly, the ecological solution and in many of those cases the coatings selected for the external protection has been multi component liquids based on 100% solids polyurethanes. (author)

  15. Application of risk assessment techniques to 'major hazard' pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cox, R A

    1982-12-01

    A risk analysis for a hazardous-material pipeline (carrying LPG, ammonia, or high-pressure gas) is presented. The analysis gives results in a form that will assist the decisionmaker in pipeline planning and route selection. The large inventory of hazardous materials in such pipelines means that risks exist even though the accident record of pipeline transportation compares favorably with that for competing modes of transport. Risk analysis techniques - commonly used in the civil aviation, nuclear, and process industries - can be equally well applied to pipelines and can produce results that not only give a measure of the risk but also indicate the principal sources of risk and possible areas for improvement. A number of pipeline risk analyses have demonstrated the viability of the technique and its usefulness as an aid to practical engineering in design, planning, and maintenance/repair phases.

  16. The LOFAR Known Pulsar Data Pipeline

    NARCIS (Netherlands)

    Alexov, A.; Hessels, J.W.T.; Mol, J.D.; Stappers, B.; van Leeuwen, J.

    2010-01-01

    Abstract: Transient radio phenomena and pulsars are one of six LOFAR Key Science Projects (KSPs). As part of the Transients KSP, the Pulsar Working Group (PWG) has been developing the LOFAR Pulsar Data Pipelines to both study known pulsars as well as search for new ones. The pipelines are being

  17. Pipeline network and environment

    International Nuclear Information System (INIS)

    Oliveira Nascimento, I.; Wagner, J.; Silveira, T.

    2012-01-01

    The Rio de Janeiro is one of 27 units of Brazil. It is located in the eastern portion of the Southeast and occupies an area of 43 696.054 km², being effectively the 3rd smallest state in Brazil. This state in recent years has suffered from erosion problems caused by the deployment of the network pipeline. The deployment pipeline is part of the activities related to the oil industry has caused a more intense conflict between the environment and economic activities, modifying the soil structure and distribution of surface and subsurface flows. This study aimed to analyze the erosion caused by the removal of soil for the deployment of pipeline transportation, with the consequences of the emergence of numerous gullies, landslides and silting of rivers. For the development of this study were performed bibliographic research, field work, mapping and digital preparation of the initial diagnosis of active processes and what the consequent environmental impacts. For these reasons, we conclude that the problems could be avoided or mitigated if there was a prior geological risk management. (author)

  18. Strength analysis of copper gas pipeline span

    OpenAIRE

    Ianevski, Philipp

    2016-01-01

    The purpose of the study was to analyze the stresses in a gas pipeline. While analyzing piping systems located inside building were used. Calculation of the strength of a gas pipeline is done by using information of the thickness of pipe walls, by choosing the suitable material, inner and outer diameter for the pipeline. Data for this thesis was collected through various internet sources and different books. From the study and research, the final results were reached and calculations were ...

  19. Preliminary results from the hierarchical glitch pipeline

    International Nuclear Information System (INIS)

    Mukherjee, Soma

    2007-01-01

    This paper reports on the preliminary results obtained from the hierarchical glitch classification pipeline on LIGO data. The pipeline that has been under construction for the past year is now complete and end-to-end tested. It is ready to generate analysis results on a daily basis. The details of the pipeline, the classification algorithms employed and the results obtained with one days analysis on the gravitational wave and several auxiliary and environmental channels from all three LIGO detectors are discussed

  20. Basic Block of Pipelined ADC Design Requirements

    Directory of Open Access Journals (Sweden)

    V. Kledrowetz

    2011-04-01

    Full Text Available The paper describes design requirements of a basic stage (called MDAC - Multiplying Digital-to- Analog Converter of a pipelined ADC. There exist error sources such as finite DC gain of opamp, capacitor mismatch, thermal noise, etc., arising when the switched capacitor (SC technique and CMOS technology are used. These non-idealities are explained and their influences on overall parameters of a pipelined ADC are studied. The pipelined ADC including non-idealities was modeled in MATLAB - Simulink simulation environment.

  1. Chile's pipelines - who's out in the cold?

    International Nuclear Information System (INIS)

    Bellhouse, G.

    1998-01-01

    There is a battle on in Northern Chile to supply the region with gas and electricity. Two pipelines and a transmission line are being built, but there is insufficient demand to merit the construction of all of these projects. It is widely believed that the first pipeline to be finished will be the overall winner, but the situation is not that simple. A more sensible conclusion could be the merger of the two pipeline projects, rationalising supply of gas to the region. (Author)

  2. 77 FR 61826 - Pipeline Safety: Communication During Emergency Situations

    Science.gov (United States)

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... liquefied natural gas pipeline facilities that operators should immediately and directly notify the Public.... Background Federal regulations for gas, liquefied natural gas (LNG), and hazardous liquid pipeline facilities...

  3. Experience with two pipeline river crossings in Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Yaremko, Eugene [Northwest Hydraulic Consultants (NHC), Edmonton (Canada); D' Agnillo, Pablo; Diaz, Jose A. [Minera Alumbrera XTRADA Copper S.A., Buenos Aires (Argentina); Bravo, Claudio

    2009-12-19

    The Alumbrera copper-gold mine located in the Province of Catamarca, northwest region of Argentina, commenced operation in October, 1997. Mine development included a 316 km long, 175 mm diameter slurry pipeline that conveys copper concentrate to a dewatering facility near the city of Tucuman, Province of Tucuman. It became apparent during the first few years of operation that, given the many potential risks of pipeline exposure associated with stream crossings, Minera Alumbrera would have to undertake an aggressive, formal program of risk management of crossings and risk mitigation. In this paper, the experience associated with two crossings is addressed: Rio Villavil; and, Rio Gastona. The original pipeline route through the 10 km length of pipeline connecting Pump Station (PS) 2 to PS 3 was directed along the bottom of the Rio Villavil valley, with most of it located within the flood way of the stream. The exposure of the pipeline at some locations and high risk of further pipeline exposures led to initiation of risk mitigation planning. Remediation work was completed by 2008. Rio Gastona, during the summer of 2001, experienced rapid shifting of the left bank at the crossing resulting in an undermined and unsupported length of pipeline. The subsequent risk mitigation method adopted in 2001 involved the planning and construction of groyne fields along both banks. (author)

  4. 77 FR 34457 - Pipeline Safety: Mechanical Fitting Failure Reports

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... notice provides clarification to owners and operators of gas distribution pipeline facilities when... of a gas distribution pipeline facility to file a written report for any mechanical fitting failure...

  5. Citizenship program in near communities of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mascarenhas, Carina R.; Vilas Boas, Ianne P. [TELSAN Engenharia, Belo Horizonte, MG (Brazil); Bourscheid, Pitagoras [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    During the construction of a pipeline, the IENE - Engineering Unit of PETROBRAS, responsible for the construction and erection of pipelines and related plants in northeastern Brazil, crossed more than 7 states and 250 counties, had implemented a social responsibility program, in special a citizenship program. This action was the result of community studies located near of the pipelines AID - Direct Influence Area (438 yards right and left of the pipeline) and through the evidence that those locations were poor and have no personal documents and citizen position in society. This paper intents to share the experience of IENE about its citizen program that worked in three big lines: community mobilization; citizenship qualification; and citizenship board. This last one, turns possible to people obtains theirs personal documents and exercise the plenitude of citizenship. (author)

  6. Using industry ROV videos to assess fish associations with subsea pipelines

    Science.gov (United States)

    McLean, D. L.; Partridge, J. C.; Bond, T.; Birt, M. J.; Bornt, K. R.; Langlois, T. J.

    2017-06-01

    Remote Operated Vehicles are routinely used to undertake inspection and maintenance activities of underwater pipelines in north-west Australia. In doing so, many terabytes of geo-referenced underwater video are collected at depths, and on a scale usually unobtainable for ecological research. We assessed fish diversity and abundance from existing ROV videos collected along 2-3 km sections of two pipelines in north-west Australia, one at 60-80 m water depth and the other at 120-130 m. A total of 5962 individual fish from 92 species and 42 families were observed. Both pipelines were characterised by a high abundance of commercially important fishes including: snappers (Lutjanidae) and groupers (Epinephelidae). The presence of thousands of unidentifiable larval fish, in addition to juveniles, sub-adults and adults suggests that the pipelines may be enhancing, rather than simply attracting, fish stocks. The prevalence and high complexity of sponges on the shallower pipeline and of deepwater corals on the deeper pipeline had a strong positive correlation with the fish abundance. These habitats likely offer a significant food source and refuge for fish, but also for invertebrates upon which fish feed. A greater diversity on the shallower pipeline, and a higher abundance of fishes on both pipelines, were associated with unsupported pipeline sections (spans) and many species appeared to be utilising pipeline spans as refuges. This study is a first look at the potential value of subsea pipelines for fishes on the north-west shelf. While the results suggest that these sections of pipeline appear to offer significant habitat that supports diverse and important commercially fished species, further work, including off-pipeline surveys on the natural seafloor, are required to determine conclusively the ecological value of pipelines and thereby inform discussions regarding the ecological implications of pipeline decommissioning.

  7. Closing the uplink/downlink loop on the new Horizons Mission to Pluto

    Science.gov (United States)

    Peterson, Joseph G.; Birath, Emma; Carcich, Brian; Harch, Ann

    Commanding the payload on a spacecraft (“ uplink” sequencing and command generation) and processing the instrument data returned (“ downlink” data processing) are two primary functions of Science Operations on a mission. While vitally important, it is sometimes surprisingly difficult to connect data returned from a spacecraft to the corresponding commanding and sequencing information that created the data, especially when data processing is done via an automated science data pipeline and not via a manual process with humans in the loop. For a variety of reasons it is necessary to make such a connection and close this loop. Perhaps the most important reason is to ensure that all data asked for has arrived safely on the ground. This is especially critical when the mission must erase parts of the spacecraft memory to make room for new data; mistakes here can result in permanent loss of data. Additionally, there are often key pieces of information (such as intended observation target or certain instrument modes that are not included in housekeeping, etc.) that are known only at the time of commanding and never makes it down in the telemetry. Because missions like New Horizons strive to be frugal with how much telemetry is sent back to Earth, and the telemetry may not include unambiguous identifiers (like observation ids, etc.), connecting downlinked data with uplink command information in an automated way can require creative approaches and heuristics. In this paper, we describe how these challenges were overcome on the New Horizons Mission to Pluto. The system developed involves ingesting uplink information into a database and automatically correlating it with downlinked data products. This allows for more useful data searches and the ability to attach the original intent of each observation to the processed science data. Also a new data tracking tool is now being developed to help in planning data playback from the spacecraft and to ensu- e data is verified

  8. Energy Equation Derivation of the Oil-Gas Flow in Pipelines Dérivation de l’équation d’énergie de l’écoulement huile-gaz dans des pipelines

    Directory of Open Access Journals (Sweden)

    Duan J.M

    2012-09-01

    Full Text Available In the simulation of oil-gas pipeline multiphase flow, thermodynamic computation is an important process interacting with the hydraulic calculation and it influences the convergence of the program and the accuracy of the results. The form of the energy equation is the key to the thermodynamic computation. Based on the energy equation of oil-gas flow in pipeline, the Explicit Temperature Drop Formula (ETDF is derived for oilgas steady state temperature calculation. This new energy equation has considered many factors, such as Joule-Thomson effect, pressure work, friction work and impact of terrain undulation and heat transfer Oil & Gas Science and Technology – Rev. IFP Energies nouvelles with the surroundings along the line. So it is an overall form of energy equation, which could describe the actual fact of multiphase pipeline accurately. Therefore, some standpoints in literatures on the temperature calculation of oil-gas two-phase flow in pipelines are reviewed. Elimination of temperature iteration loop and integration of the explicit temperature equation, instead of enthalpy energy equation, into the conjugated hydraulic and thermal computation have been found to improve the efficiency of algorithm. The calculation applied to both the component model, also applied to the black-oil model. This model is incorporated into the component model and black-oil model, respectively, and two simulations are carried out with two practical pipeline Yingmai-Yaha and Lufeng multiphase pipeline and the temperature results are compared with the simulation calculated by the OLGA and the measured. It is shown that this model has simulated the temperature distribution very well. Finally, we analyzed the influence of the specific heat capacity of oil and gas on the temperature of the mixture of fluids and the influence of the Joule-Thomson effect on the temperature distribution on the pipeline. It is shown that the Joule-Thomson coefficient is a key factor to

  9. FUZZY INFERENCE BASED LEAK ESTIMATION IN WATER PIPELINES SYSTEM

    OpenAIRE

    N. Lavanya; G. Anand; S. Srinivasan

    2015-01-01

    Pipeline networks are the most widely used mode for transporting fluids and gases around the world. Leakage in this pipeline causes harmful effects when the flowing fluid/gas is hazardous. Hence the detection of leak becomes essential to avoid/minimize such undesirable effects. This paper presents the leak detection by spectral analysis methods in a laboratory pipeline system. Transient in the pressure signal in the pipeline is created by opening and closing the exit valve. These pressure var...

  10. Influence of Anchoring on Burial Depth of Submarine Pipelines.

    Science.gov (United States)

    Zhuang, Yuan; Li, Yang; Su, Wei

    2016-01-01

    Since the beginning of the twenty-first century, there has been widespread construction of submarine oil-gas transmission pipelines due to an increase in offshore oil exploration. Vessel anchoring operations are causing more damage to submarine pipelines due to shipping transportation also increasing. Therefore, it is essential that the influence of anchoring on the required burial depth of submarine pipelines is determined. In this paper, mathematical models for ordinary anchoring and emergency anchoring have been established to derive an anchor impact energy equation for each condition. The required effective burial depth for submarine pipelines has then been calculated via an energy absorption equation for the protection layer covering the submarine pipelines. Finally, the results of the model calculation have been verified by accident case analysis, and the impact of the anchoring height, anchoring water depth and the anchor weight on the required burial depth of submarine pipelines has been further analyzed.

  11. Deliverability on the interstate natural gas pipeline system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Deliverability on the Interstate Natural Gas Pipeline System examines the capability of the national pipeline grid to transport natural gas to various US markets. The report quantifies the capacity levels and utilization rates of major interstate pipeline companies in 1996 and the changes since 1990, as well as changes in markets and end-use consumption patterns. It also discusses the effects of proposed capacity expansions on capacity levels. The report consists of five chapters, several appendices, and a glossary. Chapter 1 discusses some of the operational and regulatory features of the US interstate pipeline system and how they affect overall system design, system utilization, and capacity expansions. Chapter 2 looks at how the exploration, development, and production of natural gas within North America is linked to the national pipeline grid. Chapter 3 examines the capability of the interstate natural gas pipeline network to link production areas to market areas, on the basis of capacity and usage levels along 10 corridors. The chapter also examines capacity expansions that have occurred since 1990 along each corridor and the potential impact of proposed new capacity. Chapter 4 discusses the last step in the transportation chain, that is, deliverability to the ultimate end user. Flow patterns into and out of each market region are discussed, as well as the movement of natural gas between States in each region. Chapter 5 examines how shippers reserve interstate pipeline capacity in the current transportation marketplace and how pipeline companies are handling the secondary market for short-term unused capacity. Four appendices provide supporting data and additional detail on the methodology used to estimate capacity. 32 figs., 15 tabs.

  12. Knowledge Pipeline: A Task Oriented Way to Implement Knowledge Management

    International Nuclear Information System (INIS)

    Pan Jiajie

    2014-01-01

    Concept of knowledge pipeline: There are many pipelines named by tasks or business processes in an organization. Knowledge contributors put knowledge to its corresponding pipelines. A maintenance team could keep the knowledge in pipelines clear and valid. Users could get knowledge just like opening a faucet in terms of their tasks or business processes

  13. Inspection of the Sloka Branch pipeline. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    By agreement between Latvijas gaze and DONG (the Danish State Gas Company) the Sloka branch on the main gas pipeline Riga-Liepaja was selected for inspection. This pipeline is 30.5 km long and was constructed in 1966/67. The objective of the project has been, based on detailed inspection of relative short lengths of pipe, to determine the integrity of the pipeline and to give advice concerning the continued use as a high pressure transmission pipeline. A further objective has been to provide Latvijas gaze with a package of modern cathodic protection measuring instruments and the necessary know-how for using the instruments. The objectives have been met as follows: Based on a document review together with measurements and observations in the field and in the laboratory, the condition of approximately 10 km of pipeline has been evaluated; Recommendations are given in this report with the aim of extending the life of the pipeline; A cathodic protection instrument package was delivered and a two week training course was arranged in Latvia for Latvijas gaze`s staff covering the use of the instruments. (EG)

  14. Virtual Instrumentation Corrosion Controller for Natural Gas Pipelines

    Science.gov (United States)

    Gopalakrishnan, J.; Agnihotri, G.; Deshpande, D. M.

    2012-12-01

    Corrosion is an electrochemical process. Corrosion in natural gas (methane) pipelines leads to leakages. Corrosion occurs when anode and cathode are connected through electrolyte. Rate of corrosion in metallic pipeline can be controlled by impressing current to it and thereby making it to act as cathode of corrosion cell. Technologically advanced and energy efficient corrosion controller is required to protect natural gas pipelines. Proposed virtual instrumentation (VI) based corrosion controller precisely controls the external corrosion in underground metallic pipelines, enhances its life and ensures safety. Designing and development of proportional-integral-differential (PID) corrosion controller using VI (LabVIEW) is carried out. When the designed controller is deployed at field, it maintains the pipe to soil potential (PSP) within safe operating limit and not entering into over/under protection zone. Horizontal deployment of this technique can be done to protect all metallic structure, oil pipelines, which need corrosion protection.

  15. Testing the School-to-Prison Pipeline

    Science.gov (United States)

    Owens, Emily G.

    2017-01-01

    The School-to-Prison Pipeline is a social phenomenon where students become formally involved with the criminal justice system as a result of school policies that use law enforcement, rather than discipline, to address behavioral problems. A potentially important part of the School-to-Prison Pipeline is the use of sworn School Resource Officers…

  16. Improved cost models for optimizing CO2 pipeline configuration for point-to-point pipelines and simple networks

    NARCIS (Netherlands)

    Knoope, M. M. J.|info:eu-repo/dai/nl/364248149; Guijt, W.; Ramirez, A.|info:eu-repo/dai/nl/284852414; Faaij, A. P. C.

    In this study, a new cost model is developed for CO2 pipeline transport, which starts with the physical properties of CO2 transport and includes different kinds of steel grades and up-to-date material and construction costs. This pipeline cost model is used for a new developed tool to determine the

  17. Market Brief : Turkey oil and gas pipelines

    International Nuclear Information System (INIS)

    2001-08-01

    This report presented some quick facts about oil and gas pipelines in Turkey and presented opportunities for trade. The key players and customers in the oil and gas sector were described along with an export check list. Turkey is looking into becoming an energy bridge between oil and gas producing countries in the Middle East, Central Asia and Europe. The oil and gas sectors are dominated by the Turkish Petroleum Corporation, a public enterprise dealing with exploration and production, and the State Pipeline Corporation which deals with energy transmission. They are also the key buyers of oil and gas equipment in Turkey. There are several pipelines connecting countries bordering the Caspian Sea. Opportunities exist in the areas of engineering consulting as well as contracting services for oil and gas pipeline transmission and distribution. Other opportunities lie in the area of pipeline construction, rehabilitation, materials, equipment, installation, and supervisory control and data acquisition (SCADA) systems. Currently, the major players are suppliers from Italy, Germany, France, United States and Japan. Turkey has no trade barriers and imported equipment and materials are not subjected to any restriction. The oil and gas market in Turkey expected in increase by an average annual growth rate of 15 per cent from 2001 to 2003. A brief description of pipeline projects in Turkey was presented in this report along with a list of key contacts and support services. 25 refs., 1 append

  18. pipelines cathodic protection design methodologies for impressed

    African Journals Online (AJOL)

    HOD

    oil and gas pipelines corrosion in the United State of. American alone ... or preventing external corrosion of pipeline steels and other metallic .... 2.1 Materials and Impressed Current Design. Carbon steel ..... Research Analysis, Vol. 2, pp 2277 ...

  19. Color correction pipeline optimization for digital cameras

    Science.gov (United States)

    Bianco, Simone; Bruna, Arcangelo R.; Naccari, Filippo; Schettini, Raimondo

    2013-04-01

    The processing pipeline of a digital camera converts the RAW image acquired by the sensor to a representation of the original scene that should be as faithful as possible. There are mainly two modules responsible for the color-rendering accuracy of a digital camera: the former is the illuminant estimation and correction module, and the latter is the color matrix transformation aimed to adapt the color response of the sensor to a standard color space. These two modules together form what may be called the color correction pipeline. We design and test new color correction pipelines that exploit different illuminant estimation and correction algorithms that are tuned and automatically selected on the basis of the image content. Since the illuminant estimation is an ill-posed problem, illuminant correction is not error-free. An adaptive color matrix transformation module is optimized, taking into account the behavior of the first module in order to alleviate the amplification of color errors. The proposed pipelines are tested on a publicly available dataset of RAW images. Experimental results show that exploiting the cross-talks between the modules of the pipeline can lead to a higher color-rendition accuracy.

  20. Alberta benefits : economic impacts of northern gas pipeline construction

    International Nuclear Information System (INIS)

    Rylska, N.L.; Graebeiel, J.E.; Mirus, R.K.; Janzen, S.S.; Frost, R.J.

    2003-11-01

    This paper describes the potential economic impact and benefits to Alberta from the proposed development of the Alaska Highway Pipeline (AHP) and the Mackenzie Valley Pipeline (MVP). It also includes a planning framework for business and industry in the province. Each proposed pipeline was evaluated separately. The paper includes a list of Alberta companies that stand to benefit from the construction of one or both pipelines. The main findings indicate that northern pipeline development will bring opportunities to Alberta business in design, construction and management. There will be a secondary impact on petrochemical industries and infrastructure. Both pipeline developments will increase employment and yield billions of dollars in gross domestic product. The existing oil and gas industry in Alberta will receive value-added opportunities in areas of specialized expertise such as natural gas and natural gas liquid storage, natural gas liquid processing, and gas to liquid technology projects. The industry will also benefit from power generation and cogeneration. The northern pipelines have the potential to improve the role of First Nations in economic development. Gas consumers in Alberta should benefit from a secure supply of gas and lower prices. refs., tabs., figs

  1. Risk from transport of gas by pipeline ''kokui-perm''

    International Nuclear Information System (INIS)

    Yelokhin, A.

    1998-01-01

    Full text of publication follows: the length of gas pipelines in Russia is 142 thousands km, 62 % are pipelines of the large diameters. Annually on gas pipelines in Russia there are more than 70 large accidents, more than 50 % from them is accompanied by ignition of gas. The average ecological looses from accident is: destruction arable lands - 78 hectares; removing from consumption agricultural soils - 6,2 hectares; destruction forests - 47,5 hectares. In work the reasons of accidents on gas pipelines of different diameters are analyzed. So, for pipelines a diameter of 1220 mm by the reasons of accidents are: marriage of civil and erection works - 39, 1 %; outside corrosion - 35,9 %; mechanical damages - 9,4 %; defects of pipes - 6,2 %; defects of the factory equipment - 1,6 %; nature disasters and other reasons - 7,8 %. In work the results of risk analysis on a gas pipeline 'Kokui - Perm' are analysed. The gas pipeline 'Kokui - Perm' passes near 22 towns and countries, crosses 15 highways, 2 rail ways, 15 rivers. In work the concrete recommendations for management of risk and safety of the population are given. (author)

  2. Hubungan Kekerabatan Sapi Aceh dengan Menggunakan Daerah Displacement-loop

    Directory of Open Access Journals (Sweden)

    Mohd. Agus Nashri Abdullah

    2008-10-01

    Full Text Available Relationship of aceh cattle using displacement-loop region ABSTRACT. The aims of this study were to describe relationship of D-loop of mtDNA Aceh cattle which is useful database for conducting conservation programme. The whole blood samples were collected (8 samples for D-loop analysis from four locations which were Aceh Besar, Pidie, North Aceh regencies and Banda Aceh city. Out group whole blood samples were collected from two samples from Bali cattles (Bali Island, Madura cattle (Madura Island, Pesisir cattle (West Sumatera respectively and one sample from PO cattle (West Java. Amplification of D-loop sequences of mtDNA with BIDLF and BIDLR primary have PCR product 980 bp. The Data were analyzed using Squint 1.02 and MEGA 4.0 programme. Result of analysis indicate that Aceh cattle have nearer relationship with zebu and there is items inset of genetik Bali cattle (Bos javanicus at the end sequences start ke-354 situs up to 483, so that the origin Aceh cattle was from Bos indicus which have hybridization with Bos javanicus.

  3. Prospects for coal slurry pipelines in California

    Science.gov (United States)

    Lynch, J. F.

    1978-01-01

    The coal slurry pipeline segment of the transport industry is emerging in the United States. If accepted it will play a vital role in meeting America's urgent energy requirements without public subsidy, tax relief, or federal grants. It is proven technology, ideally suited for transport of an abundant energy resource over thousands of miles to energy short industrial centers and at more than competitive costs. Briefly discussed are the following: (1) history of pipelines; (2) California market potential; (3) slurry technology; (4) environmental benefits; (5) market competition; and (6) a proposed pipeline.

  4. An Overview of New Progresses in Understanding Pipeline Corrosion

    Energy Technology Data Exchange (ETDEWEB)

    Tan, M. YJ; Varela, F.; Huo, Y.; Gupta, R.; Abreu, D.; Mahdavi, F.; Hinton, B.; Forsyth, M. [Deakin University, Victoria (Australia)

    2016-12-15

    An approach to achieving the ambitious goal of cost effectively extending the safe operation life of energy pipeline to 100 years is the application of health monitoring and life prediction tools that are able to provide both long-term remnant pipeline life prediction and in-situ pipeline condition monitoring. A critical step is the enhancement of technological capabilities that are required for understanding and quantifying the effects of key factors influencing buried steel pipeline corrosion and environmentally assisted materials degradation, and the development of condition monitoring technologies that are able to provide in-situ monitoring and site-specific warning of pipeline damage. This paper provides an overview of our current research aimed at developing new sensors and electrochemical cells for monitoring, categorising and quantifying the level and nature of external pipeline and coating damages under the combined effects of various inter-related variables and processes such as localised corrosion, coating cracking and disbondment, cathodic shielding, transit loss of cathodic protection.

  5. Influence of Anchoring on Burial Depth of Submarine Pipelines.

    Directory of Open Access Journals (Sweden)

    Yuan Zhuang

    Full Text Available Since the beginning of the twenty-first century, there has been widespread construction of submarine oil-gas transmission pipelines due to an increase in offshore oil exploration. Vessel anchoring operations are causing more damage to submarine pipelines due to shipping transportation also increasing. Therefore, it is essential that the influence of anchoring on the required burial depth of submarine pipelines is determined. In this paper, mathematical models for ordinary anchoring and emergency anchoring have been established to derive an anchor impact energy equation for each condition. The required effective burial depth for submarine pipelines has then been calculated via an energy absorption equation for the protection layer covering the submarine pipelines. Finally, the results of the model calculation have been verified by accident case analysis, and the impact of the anchoring height, anchoring water depth and the anchor weight on the required burial depth of submarine pipelines has been further analyzed.

  6. Emergency preparedness of OSBRA Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Milton P.; Torres, Carlos A.R.; Almeida, Francisco J.C. [TRANSPETRO, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper presents the experience of PETROBRAS Transporte S. A. - TRANSPETRO in the preparation for emergencies in the OSBRA pipeline, showing specific aspects and solutions developed. The company has a standardized approach for the emergency management, based on risk analysis studies, risk management plan and contingency plans. To cover almost 1,000 km of pipeline, the Company avails of Emergency Response Centers and Environmental Defense Center, located at strategic points. In order to achieve preparation, fire fighting training and oil leakage elimination training are provided. Additionally, simulation exercises are performed, following a schedule worked out according to specific criteria and guidelines. As a conclusion, a picture is presented of the evolution of the preparation for emergencies in the OSBRA System which bears the enormous responsibility of transporting flammable products for almost 1,000 km of pipeline, crossing 40 municipalities, 3 states and the Federal District. (author)

  7. 75 FR 58014 - Pipeline Safety: Information Collection Activity; Request for Comments

    Science.gov (United States)

    2010-09-23

    ..., supports pipeline safety by ensuring the proper functioning of CPM leak detection systems. Affected Public...-phase hazardous liquid pipeline facilities that use computational pipeline monitoring (CPM) leak... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...

  8. Explicit formuli for one, two, three and four loops string amplitudes in critical dimension

    International Nuclear Information System (INIS)

    Morozov, A.Yu.

    1987-01-01

    A report on explicit formulae for loop string diagrams in the primary-quantized theory of strings is presented. In the critical dimension d=26 tachyon p-loop scattering amplitude in the theory of boson strings is presented as finite-multiple integral with respect to Riemann surface M p moduli space. Integration on M p in continual integral is determined

  9. Customer service drives pipelines' reorganization

    International Nuclear Information System (INIS)

    Share, J.

    1997-01-01

    The concept behind formation of Enron Transportation and Storage tells plenty about this new gas industry. When executives at the Enron Gas Pipeline Group considered plans last year to streamline operations by merging the support functions of Transwestern Pipeline and their other wholly owned pipeline company, Northern Natural Gas, seamless customer service was foremost on their agenda. Instead of worrying about whether employees would favor one pipeline over the other, perhaps to the detriment of customers, they simply created a new organization that everyone would swear the same allegiance to. The 17,000-mile, 4.1 Bcf/d Northern system serves the upper Midwest market and two major expansion projects were completed there last year. Transwestern is a 2,700-mile system with an eastward capacity of 1 Bcf/d and westward of 1.5 Bcf/, that traditionally served California markets. It also ties into Texas intrastate markets and, thanks to expansion of the San Juan lateral, to southern Rocky Mountain supplies. Although Enron Corp. continues to position itself as a full-service energy company, the Gas Pipeline Group continues to fuel much of corporate's net income, which was $584 million last year. With ET and S comprising a significant portion of GPG's income, it was vital that the merger of Northern's 950 employees with Transwestern's 250 indeed be a seamless one. It was not easy either psychologically or geographically with main offices in Omaha, NE and Houston as well as operations centers in Minneapolis, MN; Amarillo, TX; W. Des Moines, IA; and Albuquerque, NM. But the results have been gratifying, according to William R. Cordes, President of ET and S and Nancy L. Gardner, Executive Vice President of Strategic Initiatives

  10. Natural disasters and the gas pipeline system.

    Science.gov (United States)

    1996-11-01

    Episodic descriptions are provided of the effects of the Loma Prieta earthquake (1989) on the gas pipeline systems of Pacific Gas & Electric Company and the Cit of Palo Alto and of the Northridge earthquake (1994) on Southern California Gas' pipeline...

  11. Development of a Free-Swimming Acoustic Tool for Liquid Pipeline Leak Detection Including Evaluation for Natural Gas Pipeline Applications

    Science.gov (United States)

    2010-08-01

    Significant financial and environmental consequences often result from line leakage of oil product pipelines. Product can escape into the surrounding soil as even the smallest leak can lead to rupture of the pipeline. From a health perspective, water...

  12. Phase loop bandwidth measurements on the advanced photon source 352 MHz rf systems

    International Nuclear Information System (INIS)

    Horan, D.; Nassiri, A.; Schwartz, C.

    1997-01-01

    Phase loop bandwidth tests were performed on the Advanced Photon Source storage ring 352-MHz rf systems. These measurements were made using the HP3563A Control Systems Analyzer, with the rf systems running at 30 kilowatts into each of the storage ring cavities, without stored beam. An electronic phase shifter was used to inject approximately 14 degrees of stimulated phase shift into the low-level rf system, which produced measureable response voltage in the feedback loops without upsetting normal rf system operation. With the PID (proportional-integral-differential) amplifier settings at the values used during accelerator operation, the measurement data revealed that the 3-dB response for the cavity sum and klystron power-phase loops is approximately 7 kHz and 45 kHz, respectively, with the cavities the primary bandwidth-limiting factor in the cavity-sum loop. Data were taken at various PID settings until the loops became unstable. Crosstalk between the two phase loops was measured

  13. European pipelines spill near record amounts in 1993

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    European pipelines in 1993 spilled as much crude oil and petroleum products as in any year since 1971, when statistics first began to be reported. Final cost of cleanup will exceed $10 million, by far the most ever spent by western European oil pipelines operating on land. This cost figure is only preliminary: costs for three spills totaling nearly 2,600 cu m (approximately 16,380 bbl; 43.6% of total spilled) had not been reported through November 1994. Ten incidents of oil spills from pipelines occurred in 1993, compared with seven for 1992 and an average of 12.7/year since 1971. Total length of oil industry cross-country pipelines operating in Western Europe at the end of 1993 was 21,600 km, up from nearly 19,000 km in 1989. In all, 601 million cu m (3.8 billion bbl) of crude oil and refined products moved through the pipeline system. The paper briefly describes several of the accidents

  14. What, me worry? Pipeline certification at the FERC

    International Nuclear Information System (INIS)

    Schneider, J.D.

    1997-01-01

    Some of the new major pipeline projects that will bring Canadian gas into Chicago and the United States northeastern market were described. The seven projects discussed were: Independence Pipeline Company, Columbia's Millennium Project, Alliance Pipeline, Viking Voyageur, Pan Energy's Spectrum, Tennessee's Eastern Express, and National Fuel Expansion. The need for all this new capacity was questioned. The US FERC Commissioners are willing to let the market decide the need for this capacity. It was noted that the serious regulatory issues pipelines will face lie in the radically different rate treatment for pipelines, depending on the support the market shows for their respective projects. Various past decisions of the Federal Energy Regulatory Commission (FERC) were reviewed to illustrate the direction of the Commission's thinking in terms of regulatory approval, and to examine the question of whether FERC's approval policy makes good sense. The author's view is that the 'at risk' conditions of approval, coupled with incremental rate treatment by the Commission does, in fact, provide protection for consumers

  15. Method of drying long-distance pipelines in sections

    Energy Technology Data Exchange (ETDEWEB)

    Steinhaus, H.; Meiners, D.

    1989-04-11

    This invention provides a method of drying long distance pipelines using a vacuum, and provides high-quality drying over the whole length of the pipeline in a manageable and easily followed process. Evacuation of the pipeline is effected by means of a vacuum pump located at least at one point of the section of pipeline. The section is subsequently scavenged or flooded with scavenging gas. After a predetermined reduced pressure is reached, and while the vacuum pump continues to draw off, a scavenging is effected from the end or ends remote from the evacuation point with a molar flow rate of the stream of scavenging gas that is equal to or less than the evacuation stream in throughput, at least initially. The scavenging is effected not from the evacuation point, but from a remote point, and is also effected with a feed speed or feed amount that is throttled at least initially. This ensures that no condensation occurs even in the inner walls of the pipeline.

  16. Examination of faults active motion on buried pipelines | Parish ...

    African Journals Online (AJOL)

    ... lateral spreading, landslides and slope failures. Since the pipelines are widely spread, and in some areas necessarily cross through the areas with faults, therefore, improvement study of pipelines in areas with faults is very important. This article explores faults active motion on buried pipelines. Keywords: water utilities ...

  17. Stress and Strain State Analysis of Defective Pipeline Portion

    Science.gov (United States)

    Burkov, P. V.; Burkova, S. P.; Knaub, S. A.

    2015-09-01

    The paper presents computer simulation results of the pipeline having defects in a welded joint. Autodesk Inventor software is used for simulation of the stress and strain state of the pipeline. Places of the possible failure and stress concentrators are predicted on the defective portion of the pipeline.

  18. Induced voltages in metallic pipelines near power transmission lines

    International Nuclear Information System (INIS)

    Grcev, Leonid; Jankov, Voislav; Filiposki, Velimir

    2002-01-01

    With the continuous development of the electric power system and the pipeline networks used to convey oil or natural gas, cases of close proximity of high voltage structures and metallic pipelines become more and more frequent. Accordingly there is a growing concern about possible hazards resulting from voltages induced in the metallic pipelines by magnetic coupling with nearby power transmission lines. This paper presents a methodology for computation of the induced voltages in buried isolated metallic pipelines. A practical example of computation is also presented. (Author)

  19. The method of calculation of pipelines laid on supports

    Directory of Open Access Journals (Sweden)

    Benin D.M.

    2017-08-01

    Full Text Available this article focuses on the issue of laying pipelines on supports and the method of calculation of vertical and horizontal loads acting on the support. As pipelines can be water piping systems, heat networks, oil and mazout lines, condensate lines, steam lines, etc. this article describes the calculations of supports for pipelines laid above ground, in crowded channels, premises, on racks, in impassable channels, hanging supports, etc. The paper explores recommendations for placement of the supports on the route of the pipelines, calculation of loads on rotating and stationary supports of pipelines; inspection of stresses in the metal pipe, resulting from elongation of the piping from the temperature from the thermal expansion of the metal during operation.

  20. Sub-soil contamination due to oil spills in zones surrounding oil pipeline-pump stations and oil pipeline right-of-ways in Southwest-Mexico.

    Science.gov (United States)

    Iturbe, Rosario; Flores, Carlos; Castro, Alejandrina; Torres, Luis G

    2007-10-01

    Oil spills due to oil pipelines is a very frequent problem in Mexico. Petroleos Mexicanos (PEMEX), very concerned with the environmental agenda, has been developing inspection and correction plans for zones around oil pipelines pumping stations and pipeline right-of-way. These stations are located at regular intervals of kilometres along the pipelines. In this study, two sections of an oil pipeline and two pipeline pumping stations zones are characterized in terms of the presence of Total Petroleum Hydrocarbons (TPHs) and Polycyclic Aromatic Hydrocarbons (PAHs). The study comprehends sampling of the areas, delimitation of contamination in the vertical and horizontal extension, analysis of the sampled soils regarding TPHs content and, in some cases, the 16 PAHs considered as priority by USEPA, calculation of areas and volumes contaminated (according to Mexican legislation, specifically NOM-EM-138-ECOL-2002) and, finally, a proposal for the best remediation techniques suitable for the contamination levels and the localization of contaminants.

  1. Method for keeping equipment and pipeline of nuclear power plant

    International Nuclear Information System (INIS)

    Okubo, Osamu.

    1990-01-01

    The present invention intends to suppress corrosion of equipments and pipelines in condensate, feedwater and feedwater heater drain systems during operation of a nuclear power plant. That is, condensate, feedwater and drain remained in equipments and pipelines just after the stopping of operation are passed through pipelines comprising only conduits, or they are introduced to a condensator passing through the pipelines and condensate pipes. Further, the remaining droplets on the inner surfaces are evaporated by the remaining heat of the equipments and the pipelines themselves. Then, the equipments and pipelines are isolated from other regions and kept. In view of the above, since condensate, feedwater and water feeder drains are introduced directly to the condensator passing through the conduits in which other equipments such as tanks and pumps are not present and are isolated and kept, corrosion of the equipments and the pipelines is suppressed and radioactive contamination is suppressed from prevailing by way of cruds. (I.S.)

  2. Power flow control based solely on slow feedback loop for heart pump applications.

    Science.gov (United States)

    Wang, Bob; Hu, Aiguo Patrick; Budgett, David

    2012-06-01

    This paper proposes a new control method for regulating power flow via transcutaneous energy transfer (TET) for implantable heart pumps. Previous work on power flow controller requires a fast feedback loop that needs additional switching devices and resonant capacitors to be added to the primary converter. The proposed power flow controller eliminates these additional components, and it relies solely on a slow feedback loop to directly drive the primary converter to meet the heart pump power demand and ensure zero voltage switching. A controlled change in switching frequency varies the resonant tank shorting period of a current-fed push-pull resonant converter, thus changing the magnitude of the primary resonant voltage, as well as the tuning between primary and secondary resonant tanks. The proposed controller has been implemented successfully using an analogue circuit and has reached an end-to-end power efficiency of 79.6% at 10 W with a switching frequency regulation range of 149.3 kHz to 182.2 kHz.

  3. Pipeline mapping and strain assessment using ILI (In-line Inspection) tolls

    Energy Technology Data Exchange (ETDEWEB)

    Purvis, Brian [GE PII Pipeline Solutions, Rio de Janeiro, RJ (Brazil); Huewener, Thomas [E.ON Ruhrgas AG, Essen (Germany)

    2009-07-01

    GE PII IMU Mapping inspection system measures pipeline location coordinates (x, y, z) and provides data for determining pipeline curvature and consequential pipeline bending strain. The changes in strain can be used in the application of structural analyses and integrity evaluation of pipeline systems. This paper reviews the Inertia Measuring Unit (IMU) system and field investigation works performed on a high-pressure gas pipeline for E.ON Ruhrgas AG. The Inertial Measuring Unit of the pipeline inspection tool provides continuous measurement of the pipeline centreline coordinates. More than one inspection run was performed which allowed a more accurate strain comparison to be made. Repeatability is important to establish the reasons for increasing strain values detected at specific pipeline sections through in-line inspection surveys conducted in regular intervals over many years. Moreover, the flexibility resulting from a combination of different sensor technologies, makes it possible to provide a more complete picture of the overall situation. This paper reviews the work involved in detecting, locating and determining the magnitude and type of strain corresponding to the pipeline movement in field. (author)

  4. Fast Flux Test Facility primary sodium valves

    International Nuclear Information System (INIS)

    Rabe, G.B.; Ezra, B.C.

    1977-01-01

    The design and development of the valves used in the primary sodium coolant loop of the Fast Flux Test Facility is described. One tilting-disk check valve is used in the cold leg of the coolant loop. It is designed to limit flow reversal in the loop while maintaining a low pressure drop during forward flow. Two isolation valves are used in each coolant loop--one in the cold leg and one in the hot leg. They are of the motor-operated swinging-gate type. The design, analysis, and testing programs undertaken to develop and qualify these valves are described

  5. Sustainability of social-environmental programs along pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Doebereiner, Christian [Shell Southern Cone Gas and Power (Brazil); Herrera, Brigitte [Transredes S.A. (Bolivia)

    2005-07-01

    The sustainability of Social and Environmental programs along pipelines, have shown to be a major challenge. Gas pipelines in Bolivia and Brazil operate in a diversity of environments and communities with different cultures, values and expectations. However, the pipeline network can also provide opportunities for contributing to regional development and working with local populations on topics of mutual interest. Many of these are quite strategic because they arise from topics of mutual interest for both the company and neighboring populations, and because they provide opportunities for achieving results of mutual benefit. These opportunities could include helping to make gas available to local communities, contributions to urban planning, hiring local services and other initiatives. Sustainable and integrated Social and Environmental programs are therefore key to a successful pipeline operation. These opportunities are often missed or under valued. Some successful examples are presented from Transredes S.A., Bolivia. (author)

  6. Addressing safety issues in a hybrid liquid metal reactor

    International Nuclear Information System (INIS)

    Garabedyan, D.; Ehvart, Eh.

    1988-01-01

    Hybrid design of a fast reactor with a liquid-metal coolant, combining the advantages of traditional loop (prevailing in the USA) and integral (prevailing in Europe) arrangements is described. Just as a loop reactor the hybrid one has separate arrangement of the core and the equipment of the primary circuit heat exchange. At the same time similar to the reactor with integral arrangement, the option considered has no complex pipeline system. This reduces sharply the possibility of sodium leakages which cause fires and personnel irradiation

  7. A Java-based fMRI processing pipeline evaluation system for assessment of univariate general linear model and multivariate canonical variate analysis-based pipelines.

    Science.gov (United States)

    Zhang, Jing; Liang, Lichen; Anderson, Jon R; Gatewood, Lael; Rottenberg, David A; Strother, Stephen C

    2008-01-01

    As functional magnetic resonance imaging (fMRI) becomes widely used, the demands for evaluation of fMRI processing pipelines and validation of fMRI analysis results is increasing rapidly. The current NPAIRS package, an IDL-based fMRI processing pipeline evaluation framework, lacks system interoperability and the ability to evaluate general linear model (GLM)-based pipelines using prediction metrics. Thus, it can not fully evaluate fMRI analytical software modules such as FSL.FEAT and NPAIRS.GLM. In order to overcome these limitations, a Java-based fMRI processing pipeline evaluation system was developed. It integrated YALE (a machine learning environment) into Fiswidgets (a fMRI software environment) to obtain system interoperability and applied an algorithm to measure GLM prediction accuracy. The results demonstrated that the system can evaluate fMRI processing pipelines with univariate GLM and multivariate canonical variates analysis (CVA)-based models on real fMRI data based on prediction accuracy (classification accuracy) and statistical parametric image (SPI) reproducibility. In addition, a preliminary study was performed where four fMRI processing pipelines with GLM and CVA modules such as FSL.FEAT and NPAIRS.CVA were evaluated with the system. The results indicated that (1) the system can compare different fMRI processing pipelines with heterogeneous models (NPAIRS.GLM, NPAIRS.CVA and FSL.FEAT) and rank their performance by automatic performance scoring, and (2) the rank of pipeline performance is highly dependent on the preprocessing operations. These results suggest that the system will be of value for the comparison, validation, standardization and optimization of functional neuroimaging software packages and fMRI processing pipelines.

  8. Risk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline

    Science.gov (United States)

    Sasikirono, B.; Kim, S. J.; Haryadi, G. D.; Huda, A.

    2017-05-01

    In the oil and gas industry, the pipeline is a major component in the transmission and distribution process of oil and gas. Oil and gas distribution process sometimes performed past the pipeline across the various types of environmental conditions. Therefore, in the transmission and distribution process of oil and gas, a pipeline should operate safely so that it does not harm the surrounding environment. Corrosion is still a major cause of failure in some components of the equipment in a production facility. In pipeline systems, corrosion can cause failures in the wall and damage to the pipeline. Therefore it takes care and periodic inspections or checks on the pipeline system. Every production facility in an industry has a level of risk for damage which is a result of the opportunities and consequences of damage caused. The purpose of this research is to analyze the level of risk of 20-inch Natural Gas Transmission Pipeline using Risk-based inspection semi-quantitative based on API 581 associated with the likelihood of failure and the consequences of the failure of a component of the equipment. Then the result is used to determine the next inspection plans. Nine pipeline components were observed, such as a straight pipes inlet, connection tee, and straight pipes outlet. The risk assessment level of the nine pipeline’s components is presented in a risk matrix. The risk level of components is examined at medium risk levels. The failure mechanism that is used in this research is the mechanism of thinning. Based on the results of corrosion rate calculation, remaining pipeline components age can be obtained, so the remaining lifetime of pipeline components are known. The calculation of remaining lifetime obtained and the results vary for each component. Next step is planning the inspection of pipeline components by NDT external methods.

  9. GASVOL 18'' gas pipeline - risk based inspection study

    Energy Technology Data Exchange (ETDEWEB)

    Bjoernoey, Ola H.; Etterdal, Birger A. [Det Norske Veritas (DNV), Oslo (Norway); Guarize, Rosimar; Oliveira, Luiz F.S. [Det Norske Veritas (DNV) (Brazil); Faertes, Denise; Dias, Ricardo [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper describes a risk based approach and inspection planning as part of the Pipeline Integrity Management (PIM) system for the 95.5 km long 18'' GASVOL gas pipeline in the South eastern region of Brazil transporting circa 5 000 000 m3 dry gas per day. Pipeline systems can be subject to several degradation mechanisms and inspection and monitoring are used to ensure system integrity. Modern pipeline regulations and codes are normally based on a core safety or risk philosophy. The detailed design requirements presented in design codes are practical interpretations established so as to fulfill these core objectives. A given pipeline, designed, constructed and installed according to a pipeline code is therefore the realization of a structure, which, along its whole length, meets the applicable safety objectives of that code. The main objective of Pipeline Integrity Management (PIM) is to control and document the integrity of the pipeline for its whole service life, and to do this in a cost-effective manner. DNV has a specific approach to RBI planning, starting with an initial qualitative assessment where pipelines and damage type are ranked according to risk and potential risk reduction by an inspection and then carried forward to a quantitative detailed assessment where the level of complexity and accuracy can vary based on availability of information and owner needs. Detailed assessment requires significant effort in data gathering. The findings are dependent upon the accuracy of the inspection data, and on DNV's interpretation of the pipeline reference system and simplifications in the inspection data reported. The following specific failure mechanisms were investigated: internal corrosion, external corrosion, third party interference, landslides and black powder. RBI planning, in general words, is a 'living process'. In order to optimize future inspections, it is essential that the analyses utilize the most recent information regarding

  10. Two-loop hard-thermal-loop thermodynamics with quarks

    International Nuclear Information System (INIS)

    Andersen, Jens O.; Petitgirard, Emmanuel; Strickland, Michael

    2004-01-01

    We calculate the quark contribution to the free energy of a hot quark-gluon plasma to two-loop order using hard-thermal-loop (HTL) perturbation theory. All ultraviolet divergences can be absorbed into renormalizations of the vacuum energy and the HTL quark and gluon mass parameters. The quark and gluon HTL mass parameters are determined self-consistently by a variational prescription. Combining the quark contribution with the two-loop HTL perturbation theory free energy for pure glue we obtain the total two-loop QCD free energy. Comparisons are made with lattice estimates of the free energy for N f =2 and with exact numerical results obtained in the large-N f limit

  11. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  12. Simplified Technique for Predicting Offshore Pipeline Expansion

    Science.gov (United States)

    Seo, J. H.; Kim, D. K.; Choi, H. S.; Yu, S. Y.; Park, K. S.

    2018-06-01

    In this study, we propose a method for estimating the amount of expansion that occurs in subsea pipelines, which could be applied in the design of robust structures that transport oil and gas from offshore wells. We begin with a literature review and general discussion of existing estimation methods and terminologies with respect to subsea pipelines. Due to the effects of high pressure and high temperature, the production of fluid from offshore wells is typically caused by physical deformation of subsea structures, e.g., expansion and contraction during the transportation process. In severe cases, vertical and lateral buckling occurs, which causes a significant negative impact on structural safety, and which is related to on-bottom stability, free-span, structural collapse, and many other factors. In addition, these factors may affect the production rate with respect to flow assurance, wax, and hydration, to name a few. In this study, we developed a simple and efficient method for generating a reliable pipe expansion design in the early stage, which can lead to savings in both cost and computation time. As such, in this paper, we propose an applicable diagram, which we call the standard dimensionless ratio (SDR) versus virtual anchor length (L A ) diagram, that utilizes an efficient procedure for estimating subsea pipeline expansion based on applied reliable scenarios. With this user guideline, offshore pipeline structural designers can reliably determine the amount of subsea pipeline expansion and the obtained results will also be useful for the installation, design, and maintenance of the subsea pipeline.

  13. Research on Connection and Function Reliability of the Oil&Gas Pipeline System

    Directory of Open Access Journals (Sweden)

    Xu Bo

    2017-01-01

    Full Text Available Pipeline transportation is the optimal way for energy delivery in terms of safety, efficiency and environmental protection. Because of the complexity of pipeline external system including geological hazards, social and cultural influence, it is a great challenge to operate the pipeline safely and reliable. Therefore, the pipeline reliability becomes an important issue. Based on the classical reliability theory, the analysis of pipeline system is carried out, then the reliability model of the pipeline system is built, and the calculation is addressed thereafter. Further the connection and function reliability model is applied to a practical active pipeline system, with the use of the proposed methodology of the pipeline system; the connection reliability and function reliability are obtained. This paper firstly presented to considerate the connection and function reliability separately and obtain significant contribution to establish the mathematical reliability model of pipeline system, hence provide fundamental groundwork for the pipeline reliability research in the future.

  14. Isotopic method of leaks detection in oil pipelines

    International Nuclear Information System (INIS)

    Listwam, W.; Mottl, J.

    1974-01-01

    Isotopic method of leaks detection in oil pipelines of diameter 200-800 mm is described. Tracer is injected into pipeline in the form of CH 3 Br 82 . After few hours one or two detectors are passed through pipeline to detect leaks. Detector set consists of scintillation radiometer with Na I/Tl crystal, electronic blecks with one-channel analyzer, recorder and storage batteries. Detector set is built on integrated circuits. (Z.M.)

  15. A real-time non-contact monitoring method of subsea pipelines

    Directory of Open Access Journals (Sweden)

    Song Dalei

    2015-01-01

    Full Text Available To monitoring the subsea pipeline in real-time, a special potentiometric sensor array and a potential prediction model are presented in this paper. Firstly, to measure the potential of seawater, a special potentiometric sensor array with Ag/AgCl all-solid-state reference electrodes is first developed in this paper. Secondly, according to the obtained distribution law of electric field intensities a prediction model of the pipeline potentials is developed. Finally, the potentiometric sensor array is applied in sink experiment and the prediction model is validated by the sink measurements. The maximum error for pipeline potential prediction model is 1.1 mV. The proposed non-contact monitoring method for subsea pipeline can predict the potential of sea pipeline in real-time, thus providing important information for further subsea pipeline maintenance.

  16. The Bakou-Ceyhan pipeline: paradoxes and coherence of the USA strategy of pipelines; L'oleoduc Bakou-Ceyhan: paradoxes et coherence de la strategie americaine des pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Jafalian, A

    2004-07-01

    In 2002, the construction of the Bakou-Ceyhan pipeline, from the Caspian Sea to the Mediterranean Sea, is begun, in spite of the the controversies of industrialists against politicians and experts. The diplomatic USA activity in favor this pipeline largely contributes to the problems solution. The author presents the USA policy and strategy in the region, the economic constraints and the negotiations. (A.L.B.)

  17. 75 FR 32836 - Pipeline Safety: Workshop on Public Awareness Programs

    Science.gov (United States)

    2010-06-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... American Public Gas Association Association of Oil Pipelines American Petroleum Institute Interstate... the pipeline industry). Hazardous Liquid Gas Transmission/Gathering Natural Gas Distribution (10...

  18. Pipelines in Louisiana, Geographic NAD83, USGS (1999) [pipelines_la_usgs_1999

    Data.gov (United States)

    Louisiana Geographic Information Center — This dataset contains vector line map information of various pipelines throughout the State of Louisiana. The vector data contain selected base categories of...

  19. The MIRI Medium Resolution Spectrometer calibration pipeline

    NARCIS (Netherlands)

    Labiano, A.; Azzollini, R.; Bailey, J.; Beard, S.; Dicken, D.; García-Marín, M.; Geers, V.; Glasse, A.; Glauser, A.; Gordon, K.; Justtanont, K.; Klaassen, P.; Lahuis, F.; Law, D.; Morrison, J.; Müller, M.; Rieke, G.; Vandenbussche, B.; Wright, G.

    2016-01-01

    The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer (MRS) is the only mid-IR Integral Field Spectrometer on board James Webb Space Telescope. The complexity of the MRS requires a very specialized pipeline, with some specific steps not present in other pipelines of JWST instruments,

  20. LoopIng: a template-based tool for predicting the structure of protein loops.

    KAUST Repository

    Messih, Mario Abdel; Lepore, Rosalba; Tramontano, Anna

    2015-01-01

    ) and significant enhancements for long loops (11-20 residues). The quality of the predictions is robust to errors that unavoidably affect the stem regions when these are modeled. The method returns a confidence score for the predicted template loops and has

  1. Oil pipeline performance review 1995, 1996, 1997, 1998 : Technical/statistical report

    International Nuclear Information System (INIS)

    2000-12-01

    This document provides a summary of the pipeline performance and reportable pipeline failures of liquid hydrocarbon pipelines in Canada, for the years 1995 through 1998. The year 1994 was the last one for which the Oil Pipeline Performance Review (OPPR) was published on an annual basis. The OPPR will continue to be published until such time as the Pipeline Risk Assesment Sub-Committee (PRASC) has obtained enough pipeline failure data to be aggregated into a meaningful report. The shifts in the mix of reporting pipeline companies is apparent in the data presented, comparing the volumes transported and the traffic volume during the previous ten-year period. Another table presents a summary of the failures which occurred during the period under consideration, 1995-1998, allowing for a comparison with the data for the previous ten-year period. From the current perspective and from an historical context, this document provides a statistical review of the performance of the pipelines, covering refined petroleum product pipelines, clean oil pipelines and High Vapour Pressure (HVP) pipelines downstream of battery limits. Classified as reportable are spills of 1.5 cubic metre or more of liquid hydrocarbons, any amount of HVP material, any incident involving an injury, a death, a fire, or an explosion. For those companies that responded to the survey, the major items, including number of failures and volumes released are accurate. Samples of the forms used for collecting the information are provided within the document. 6 tabs., 1 fig

  2. Probability safety assessment of LOOP accident to molten salt reactor

    International Nuclear Information System (INIS)

    Mei Mudan; Shao Shiwei; Yu Zhizhen; Chen Kun; Zuo Jiaxu

    2013-01-01

    Background: Loss of offsite power (LOOP) is a possible accident to any type of reactor, and this accident can reflect the main idea of reactor safety design. Therefore, it is very important to conduct a study on probabilistic safety assessment (PSA) of the molten salt reactor that is under LOOP circumstance. Purpose: The aim is to calculate the release frequency of molten salt radioactive material to the core caused by LOOP, and find out the biggest contributor to causing the radioactive release frequency. Methods: We carried out the PSA analysis of the LOOP using the PSA process risk spectrum, and assumed that the primary circuit had no valve and equipment reliability data based on the existing mature power plant equipment reliability data. Results: Through the PSA analysis, we got the accident sequences of the release of radioactive material to the core caused by LOOP and its frequency. The results show that the release frequency of molten salt radioactive material to the core caused by LOOP is about 2×10 -11 /(reactor ·year), which is far below that of the AP1000 LOOP. In addition, through the quantitative analysis, we obtained the point estimation and interval estimation of uncertainty analysis, and found that the biggest contributor to cause the release frequency of radioactive material to the core is the reactor cavity cooling function failure. Conclusion: This study provides effective help for the design and improvement of the following molten salt reactor system. (authors)

  3. 49 CFR 195.452 - Pipeline integrity management in high consequence areas.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline integrity management in high consequence... Management § 195.452 Pipeline integrity management in high consequence areas. (a) Which pipelines are covered... that could affect a high consequence area, including any pipeline located in a high consequence area...

  4. Data processing pipeline for Herschel HIFI

    Science.gov (United States)

    Shipman, R. F.; Beaulieu, S. F.; Teyssier, D.; Morris, P.; Rengel, M.; McCoey, C.; Edwards, K.; Kester, D.; Lorenzani, A.; Coeur-Joly, O.; Melchior, M.; Xie, J.; Sanchez, E.; Zaal, P.; Avruch, I.; Borys, C.; Braine, J.; Comito, C.; Delforge, B.; Herpin, F.; Hoac, A.; Kwon, W.; Lord, S. D.; Marston, A.; Mueller, M.; Olberg, M.; Ossenkopf, V.; Puga, E.; Akyilmaz-Yabaci, M.

    2017-12-01

    Context. The HIFI instrument on the Herschel Space Observatory performed over 9100 astronomical observations, almost 900 of which were calibration observations in the course of the nearly four-year Herschel mission. The data from each observation had to be converted from raw telemetry into calibrated products and were included in the Herschel Science Archive. Aims: The HIFI pipeline was designed to provide robust conversion from raw telemetry into calibrated data throughout all phases of the HIFI missions. Pre-launch laboratory testing was supported as were routine mission operations. Methods: A modular software design allowed components to be easily added, removed, amended and/or extended as the understanding of the HIFI data developed during and after mission operations. Results: The HIFI pipeline processed data from all HIFI observing modes within the Herschel automated processing environment as well as within an interactive environment. The same software can be used by the general astronomical community to reprocess any standard HIFI observation. The pipeline also recorded the consistency of processing results and provided automated quality reports. Many pipeline modules were in use since the HIFI pre-launch instrument level testing. Conclusions: Processing in steps facilitated data analysis to discover and address instrument artefacts and uncertainties. The availability of the same pipeline components from pre-launch throughout the mission made for well-understood, tested, and stable processing. A smooth transition from one phase to the next significantly enhanced processing reliability and robustness. Herschel was an ESA space observatory with science instruments provided by European-led Principal Investigator consortia and with important participation from NASA.

  5. Kepler Science Operations Center Pipeline Framework

    Science.gov (United States)

    Klaus, Todd C.; McCauliff, Sean; Cote, Miles T.; Girouard, Forrest R.; Wohler, Bill; Allen, Christopher; Middour, Christopher; Caldwell, Douglas A.; Jenkins, Jon M.

    2010-01-01

    The Kepler mission is designed to continuously monitor up to 170,000 stars at a 30 minute cadence for 3.5 years searching for Earth-size planets. The data are processed at the Science Operations Center (SOC) at NASA Ames Research Center. Because of the large volume of data and the memory and CPU-intensive nature of the analysis, significant computing hardware is required. We have developed generic pipeline framework software that is used to distribute and synchronize the processing across a cluster of CPUs and to manage the resulting products. The framework is written in Java and is therefore platform-independent, and scales from a single, standalone workstation (for development and research on small data sets) to a full cluster of homogeneous or heterogeneous hardware with minimal configuration changes. A plug-in architecture provides customized control of the unit of work without the need to modify the framework itself. Distributed transaction services provide for atomic storage of pipeline products for a unit of work across a relational database and the custom Kepler DB. Generic parameter management and data accountability services are provided to record the parameter values, software versions, and other meta-data used for each pipeline execution. A graphical console allows for the configuration, execution, and monitoring of pipelines. An alert and metrics subsystem is used to monitor the health and performance of the pipeline. The framework was developed for the Kepler project based on Kepler requirements, but the framework itself is generic and could be used for a variety of applications where these features are needed.

  6. Design of Submarine Pipeline With Respect to Corrosion and Material Selection

    OpenAIRE

    El-Mogi, Hossam

    2016-01-01

    Master's thesis in Offshore technology : subsea technology Pipelines are an essential part of the oil and gas industry as they are the main means of transportation. As the offshore technology advances, subsea pipelines are being operated in more demanding environments. For the pipelines to operate efficiently, they have to be carefully designed. One of the main threats to the integrity of the pipeline is corrosion, which has caused many failures. Corrosion in subsea pipelines has different...

  7. Seismic response of buried pipelines: a state-of-the-art review

    International Nuclear Information System (INIS)

    Datta, T.K.

    1999-01-01

    A state-of-the-art review of the seismic response of buried pipelines is presented. The review includes modeling of soil-pipe system and seismic excitation, methods of response analysis of buried pipelines, seismic behavior of buried pipelines under different parametric variations, seismic stresses at the bends and intersections of network of pipelines. pipe damage in earthquakes and seismic risk analysis of buried pipelines. Based on the review, the future scope of work on the subject is outlined. (orig.)

  8. Pipeline developments 1998 and beyond : more choices, more difficult decisions

    Energy Technology Data Exchange (ETDEWEB)

    VanderSchee, K. [EnergyERA (Canada)

    1998-12-31

    Some of the basic economic principles that drive gas prices and gas flows across North America, and the pressures these have placed on the pipeline sector, are reviewed. Of pressing importance to the natural gas industry in Western Canada is the prospect that in the near future industrial gas users in eastern Canada will have a wider array of pipeline choices available to them than ever before. This will mean that the users will face more offerings from more pipeline providers, forcing pipeline owners to make more difficult decisions regarding new pipeline capacity. Variables such as price, terms and conditions will become increasingly negotiable. Market power concerns also remain an important issue. As a result, there is increasing call for market-based financial regulation of pipelines. `Market gaming` a condition where a firm manipulates the market to its own market advantage is also receiving considerable attention. The latter is of particular concern in the United States. Against this background, the nature of competition (or the lack of it) in natural gas transport, the influence of short-term service revenues for pipelines, pipeline commitments through subsidiaries, and concerns over short term pipeline valuations skewing investment decisions, are issues that will continue to invite much attention. Regarding market outlook, it was noted that significantly increased export capacity from Alberta could raise the costs of Alberta supplies to eastern Canadian end-users relative to other supply/transport options which may now be viable economic alternatives. figs.

  9. Pipeline developments 1998 and beyond : more choices, more difficult decisions

    International Nuclear Information System (INIS)

    VanderSchee, K.

    1998-01-01

    Some of the basic economic principles that drive gas prices and gas flows across North America, and the pressures these have placed on the pipeline sector, are reviewed. Of pressing importance to the natural gas industry in Western Canada is the prospect that in the near future industrial gas users in eastern Canada will have a wider array of pipeline choices available to them than ever before. This will mean that the users will face more offerings from more pipeline providers, forcing pipeline owners to make more difficult decisions regarding new pipeline capacity. Variables such as price, terms and conditions will become increasingly negotiable. Market power concerns also remain an important issue. As a result, there is increasing call for market-based financial regulation of pipelines. 'Market gaming' a condition where a firm manipulates the market to its own market advantage is also receiving considerable attention. The latter is of particular concern in the United States. Against this background, the nature of competition (or the lack of it) in natural gas transport, the influence of short-term service revenues for pipelines, pipeline commitments through subsidiaries, and concerns over short term pipeline valuations skewing investment decisions, are issues that will continue to invite much attention. Regarding market outlook, it was noted that significantly increased export capacity from Alberta could raise the costs of Alberta supplies to eastern Canadian end-users relative to other supply/transport options which may now be viable economic alternatives. figs

  10. 76 FR 70217 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-11-10

    ... combined comment from American Petroleum Institute (API) and American Oil Pipelines Association (AOPL) on... some rural low-stress hazardous liquid pipelines are not subject to part 195 although they are required...

  11. PIPELINE CORROSION CONTROL IN OIL AND GAS INDUSTRY: A ...

    African Journals Online (AJOL)

    Corrosion in pipelines is one of the major challenges faced by oil and gas industries all over the world. This has made corrosion control or management a major factor to consider before setting up any industry that will transport products via pipelines. In this study the types of corrosion found on system 2A pipeline were; ...

  12. Optimizing pipeline transportation using a fuzzy controller

    Energy Technology Data Exchange (ETDEWEB)

    Aramaki, Thiago L.; Correa, Joao L. L.; Montalvoa, Antonio F. F. [National Control and Operation Center Tranpetro, Rio de Janeiro, (Brazil)

    2010-07-01

    The optimization of pipeline transportation is a big concern for the transporter companies. This paper is the third of a series of three articles which investigated the application of a system to simulate the human ability to operate a pipeline in an optimized way. The present paper presents the development of a proportional integral (PI) fuzzy controller, in order to optimize pipeline transportation capacity. The fuzzy adaptive PI controller system was developed and tested with a hydraulic simulator. On-field data were used from the OSBRA pipeline. The preliminary tests showed that the performance of the software simulation was satisfactory. It varied the set-point of the conventional controller within the limits of flow meters. The transport capacity of the pipe was maximize without compromising the integrity of the commodities transported. The system developed proved that it can be easily deployed as a specialist optimizing system to be added to SCADA systems.

  13. A novel approach to pipeline tensioner modeling

    Energy Technology Data Exchange (ETDEWEB)

    O' Grady, Robert; Ilie, Daniel; Lane, Michael [MCS Software Division, Galway (Ireland)

    2009-07-01

    As subsea pipeline developments continue to move into deep and ultra-deep water locations, there is an increasing need for the accurate prediction of expected pipeline fatigue life. A significant factor that must be considered as part of this process is the fatigue damage sustained by the pipeline during installation. The magnitude of this installation-related damage is governed by a number of different agents, one of which is the dynamic behavior of the tensioner systems during pipe-laying operations. There are a variety of traditional finite element methods for representing dynamic tensioner behavior. These existing methods, while basic in nature, have been proven to provide adequate forecasts in terms of the dynamic variation in typical installation parameters such as top tension and sagbend/overbend strain. However due to the simplicity of these current approaches, some of them tend to over-estimate the frequency of tensioner pay out/in under dynamic loading. This excessive level of pay out/in motion results in the prediction of additional stress cycles at certain roller beds, which in turn leads to the prediction of unrealistic fatigue damage to the pipeline. This unwarranted fatigue damage then equates to an over-conservative value for the accumulated damage experienced by a pipeline weld during installation, and so leads to a reduction in the estimated fatigue life for the pipeline. This paper describes a novel approach to tensioner modeling which allows for greater control over the velocity of dynamic tensioner pay out/in and so provides a more accurate estimation of fatigue damage experienced by the pipeline during installation. The paper reports on a case study, as outlined in the proceeding section, in which a comparison is made between results from this new tensioner model and from a more conventional approach. The comparison considers typical installation parameters as well as an in-depth look at the predicted fatigue damage for the two methods

  14. Pipeline abandonment - a discussion paper on technical and environmental issues

    International Nuclear Information System (INIS)

    1996-11-01

    The technical and environmental issues associated with pipeline abandonment were reviewed to provide a basis for the development of guidelines that companies could follow in order to abandon oil and gas pipelines in an environmentally safe and economic manner. Some of the topics discussed include land use management, ground subsidence, soil and groundwater contamination, erosion and the potential to create water conduits. A major issue still to be resolved, i.e., the legal and financial aspects of pipeline abandonment, was addressed. An industry-financed fund has been created to cover the cost of reclamation and abandonment of orphaned pipelines and certain associated pipeline facilities. 30 refs., 4 tabs., 3 figs

  15. Optimal Energy Consumption Analysis of Natural Gas Pipeline

    Science.gov (United States)

    Liu, Enbin; Li, Changjun; Yang, Yi

    2014-01-01

    There are many compressor stations along long-distance natural gas pipelines. Natural gas can be transported using different boot programs and import pressures, combined with temperature control parameters. Moreover, different transport methods have correspondingly different energy consumptions. At present, the operating parameters of many pipelines are determined empirically by dispatchers, resulting in high energy consumption. This practice does not abide by energy reduction policies. Therefore, based on a full understanding of the actual needs of pipeline companies, we introduce production unit consumption indicators to establish an objective function for achieving the goal of lowering energy consumption. By using a dynamic programming method for solving the model and preparing calculation software, we can ensure that the solution process is quick and efficient. Using established optimization methods, we analyzed the energy savings for the XQ gas pipeline. By optimizing the boot program, the import station pressure, and the temperature parameters, we achieved the optimal energy consumption. By comparison with the measured energy consumption, the pipeline now has the potential to reduce energy consumption by 11 to 16 percent. PMID:24955410

  16. Alliance Pipeline : the new kid on the block

    International Nuclear Information System (INIS)

    Cornelson, D.

    1998-01-01

    An update on progress of Alliance Pipelines, comments on issues facing gas transporters from western Canada, some discussion of gas supply in general, and the prospects for future expansion of the natural gas industry are provided. According to industry insiders, North American gas demand is expected to increase by 1.5 per cent per year. In order for Canadian gas to participate in this growth additional pipeline capacity is needed. The Alliance Pipeline capacity represents about 20 per cent of this demand growth over the next 5 years. The Alliance Pipeline development will create an opportunity to deliver western Canadian gas to Chicago, a point where North American market competition exists and the market volume and liquidity is large. This presentation also provides an update on the current regulatory status and construction timing. Currently, Alliance has over C$8 billion in firm shipping commitments and up to C$5 billion in financing in place. Pipeline construction will begin in the spring of 1999; it is expected to be operational by the fall of 2000. tabs., figs

  17. Quantitative risk analysis in two pipelines operated by TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, Claudio B. [PETROBRAS Transporte S/A (TRANSPETRO), Rio de Janeiro, RJ (Brazil); Pinho, Edson [Universidade Federal Rural do Rio de Janeiro (UFRRJ), Seropedica, RJ (Brazil); Bittencourt, Euclides [Centro Universitario FIB, Salvador , BA (Brazil)

    2009-07-01

    Transportation risk analysis techniques were used to study two pipelines operated by TRANSPETRO. The Pipeline A is for the simultaneous transportation of diesel, gasoline and LPG and comprises three parts, all of them crossing rural areas. The Pipeline B is for oil transportation and one of its ends is located in an area of a high density population. Both pipelines had their risk studied using the PHAST RISK{sup R} software and the individual risk measures, the only considered measures for license purposes for this type of studies, presented level far below the maximum tolerable levels considered. (author)

  18. 75 FR 56972 - Pipeline Safety: Control Room Management/Human Factors

    Science.gov (United States)

    2010-09-17

    ... for certain pipelines where controllers use supervisory control and data acquisition (SCADA) systems..., for all substantive provisions in the rule. Justification PHMSA periodically reviews its pipeline... expediting the implementation deadlines for the selected paragraphs will have significant impact to pipeline...

  19. Fluid pipeline system leak detection based on neural network and pattern recognition

    International Nuclear Information System (INIS)

    Tang Xiujia

    1998-01-01

    The mechanism of the stress wave propagation along the pipeline system of NPP, caused by turbulent ejection from pipeline leakage, is researched. A series of characteristic index are described in time domain or frequency domain, and compress numerical algorithm is developed for original data compression. A back propagation neural networks (BPNN) with the input matrix composed by stress wave characteristics in time domain or frequency domain is first proposed to classify various situations of the pipeline, in order to detect the leakage in the fluid flow pipelines. The capability of the new method had been demonstrated by experiments and finally used to design a handy instrument for the pipeline leakage detection. Usually a pipeline system has many inner branches and often in adjusting dynamic condition, it is difficult for traditional pipeline diagnosis facilities to identify the difference between inner pipeline operation and pipeline fault. The author first proposed pipeline wave propagation identification by pattern recognition to diagnose pipeline leak. A series of pattern primitives such as peaks, valleys, horizon lines, capstan peaks, dominant relations, slave relations, etc., are used to extract features of the negative pressure wave form. The context-free grammar of symbolic representation of the negative wave form is used, and a negative wave form parsing system with application to structural pattern recognition based on the representation is first proposed to detect and localize leaks of the fluid pipelines

  20. Failure analysis of high strength pipeline with single and multiple corrosions

    International Nuclear Information System (INIS)

    Chen, Yanfei; Zhang, Hong; Zhang, Juan; Li, Xin; Zhou, Jing

    2015-01-01

    Highlights: • We study failure of high strength pipelines with single corrosion. • We give regression equations for failure pressure prediction. • We propose assessment procedure for pipelines with multiple corrosions. - Abstract: Corrosion will compromise safety operation of oil and gas pipelines, accurate determination of failure pressure finds importance in residual strength assessment and corrosion allowance design of onshore and offshore pipelines. This paper investigates failure pressure of high strength pipeline with single and multiple corrosions using nonlinear finite element analysis. On the basis of developed regression equations for failure pressure prediction of high strength pipeline with single corrosion, the paper proposes an assessment procedure for predicting failure pressure of high strength pipeline with multiple corrosions. Furthermore, failure pressures predicted by proposed solutions are compared with experimental results and various assessment methods available in literature, where accuracy and versatility are demonstrated

  1. Impacts of space weather and space climate on pipeline network operations

    Science.gov (United States)

    Trichtchenko, Larisa

    2014-05-01

    The geomagnetic fluctuations are accompanied by geo-electric (telluric) field and telluric currents at the surface of the Earth and in the pipelines. These currents interfere with pipeline corrosion protection, creating pipe-to-soil potential (PSP) fluctuations. It impacts pipeline operations in two ways. One is that non-disturbed "true" level of the protection is not known, which might lead to the wrong conclusions that a pipeline coating is damaged and digging out the section of the pipeline is needed. The other effect is changes in the electrical conditions in the pipeline-soil interface, compromising the corrosion protection and possibly causing enhancement of the corrosion. The global trend for construction of more pipelines in northern regions means placing them into areas where natural geomagnetic variations are larger and consequently telluric activity is more extreme, in comparison with pipelines located further south. This paper describes the solutions implemented as the result of the two projects done by NRCan researchers led by the author on request from pipeline companies. Two methods were proposed and implemented to address the problems. One is the statistical estimation of the telluric activity in the area of the planned pipelines. These statistical considerations then used as guidance in the design of corrosion protection systems to counteract the excessive corrosion. The other, to deal with the corrupted results during the pipeline surveys, is to forecast the geomagnetic storms for proper planning of the surveys. In addition, the developed telluric activity identification tool can be used in the analysis of the corrupted survey data.

  2. Statistical method to compare massive parallel sequencing pipelines.

    Science.gov (United States)

    Elsensohn, M H; Leblay, N; Dimassi, S; Campan-Fournier, A; Labalme, A; Roucher-Boulez, F; Sanlaville, D; Lesca, G; Bardel, C; Roy, P

    2017-03-01

    Today, sequencing is frequently carried out by Massive Parallel Sequencing (MPS) that cuts drastically sequencing time and expenses. Nevertheless, Sanger sequencing remains the main validation method to confirm the presence of variants. The analysis of MPS data involves the development of several bioinformatic tools, academic or commercial. We present here a statistical method to compare MPS pipelines and test it in a comparison between an academic (BWA-GATK) and a commercial pipeline (TMAP-NextGENe®), with and without reference to a gold standard (here, Sanger sequencing), on a panel of 41 genes in 43 epileptic patients. This method used the number of variants to fit log-linear models for pairwise agreements between pipelines. To assess the heterogeneity of the margins and the odds ratios of agreement, four log-linear models were used: a full model, a homogeneous-margin model, a model with single odds ratio for all patients, and a model with single intercept. Then a log-linear mixed model was fitted considering the biological variability as a random effect. Among the 390,339 base-pairs sequenced, TMAP-NextGENe® and BWA-GATK found, on average, 2253.49 and 1857.14 variants (single nucleotide variants and indels), respectively. Against the gold standard, the pipelines had similar sensitivities (63.47% vs. 63.42%) and close but significantly different specificities (99.57% vs. 99.65%; p < 0.001). Same-trend results were obtained when only single nucleotide variants were considered (99.98% specificity and 76.81% sensitivity for both pipelines). The method allows thus pipeline comparison and selection. It is generalizable to all types of MPS data and all pipelines.

  3. Pipeline template for streaming applications on heterogeneous chips

    OpenAIRE

    Rodríguez, Andrés; Navarro, Ángeles; Asenjo-Plaza, Rafael; Corbera, Francisco; Vilches, Antonio; Garzarán, María

    2015-01-01

    We address the problem of providing support for executing single streaming applications implemented as a pipeline of stages that run on heterogeneous chips comprised of several cores and one on-chip GPU. In this paper, we mainly focus on the API that allows the user to specify the type of parallelism exploited by each pipeline stage running on the multicore CPU, the mapping of the pipeline stages to the devices (GPU or CPU), and the number of active threads. We use a rea...

  4. TESS Data Processing and Quick-look Pipeline

    Science.gov (United States)

    Fausnaugh, Michael; Huang, Xu; Glidden, Ana; Guerrero, Natalia; TESS Science Office

    2018-01-01

    We describe the data analysis procedures and pipelines for the Transiting Exoplanet Survey Satellite (TESS). We briefly review the processing pipeline developed and implemented by the Science Processing Operations Center (SPOC) at NASA Ames, including pixel/full-frame image calibration, photometric analysis, pre-search data conditioning, transiting planet search, and data validation. We also describe data-quality diagnostic analyses and photometric performance assessment tests. Finally, we detail a "quick-look pipeline" (QLP) that has been developed by the MIT branch of the TESS Science Office (TSO) to provide a fast and adaptable routine to search for planet candidates in the 30 minute full-frame images.

  5. ARTIP: Automated Radio Telescope Image Processing Pipeline

    Science.gov (United States)

    Sharma, Ravi; Gyanchandani, Dolly; Kulkarni, Sarang; Gupta, Neeraj; Pathak, Vineet; Pande, Arti; Joshi, Unmesh

    2018-02-01

    The Automated Radio Telescope Image Processing Pipeline (ARTIP) automates the entire process of flagging, calibrating, and imaging for radio-interferometric data. ARTIP starts with raw data, i.e. a measurement set and goes through multiple stages, such as flux calibration, bandpass calibration, phase calibration, and imaging to generate continuum and spectral line images. Each stage can also be run independently. The pipeline provides continuous feedback to the user through various messages, charts and logs. It is written using standard python libraries and the CASA package. The pipeline can deal with datasets with multiple spectral windows and also multiple target sources which may have arbitrary combinations of flux/bandpass/phase calibrators.

  6. Integrating sustainable growth into export pipeline projects

    International Nuclear Information System (INIS)

    Jeniffer, Barringer; William, Lukens; Patricia, Wild

    2002-01-01

    Full text: Sustainable growth in the energy industry is rapidly expanding beyond the conceptual stage. Policies addressing the three principles of Sustainable Development are being established and strategies to execute these policies are being developed and implemented in the field. Conoco is developing a strong corporate culture around sustainable growth; and, pipeline systems play a vital role in delivering the triple bottom line results for our stake holders. This paper will highlight some of the key focal points by Conoco Inc., in each phase of pipeline project development, execution, and operation to make pipeline projects a contributor to Conoco's sustainable growth success, and shares some lessons learned

  7. Neocortical electrical stimulation for epilepsy : Closed-loop versus open-loop

    NARCIS (Netherlands)

    Vassileva, Albena; van Blooijs, Dorien; Leijten, Frans; Huiskamp, Geertjan

    2018-01-01

    The aim of this review is to evaluate whether open-loop or closed-loop neocortical electrical stimulation should be the preferred approach to manage seizures in intractable epilepsy. Twenty cases of open-loop neocortical stimulation with an implanted device have been reported, in 5 case studies.

  8. Development of Protective Coatings for Co-Sequestration Processes and Pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Bierwagen, Gordon; Huang, Yaping

    2011-11-30

    The program, entitled Development of Protective Coatings for Co-Sequestration Processes and Pipelines, examined the sensitivity of existing coating systems to supercritical carbon dioxide (SCCO2) exposure and developed new coating system to protect pipelines from their corrosion under SCCO2 exposure. A literature review was also conducted regarding pipeline corrosion sensors to monitor pipes used in handling co-sequestration fluids. Research was to ensure safety and reliability for a pipeline involving transport of SCCO2 from the power plant to the sequestration site to mitigate the greenhouse gas effect. Results showed that one commercial coating and one designed formulation can both be supplied as potential candidates for internal pipeline coating to transport SCCO2.

  9. The leak detection and location system design of petroleum pipeline

    International Nuclear Information System (INIS)

    Liu Lixia

    2011-01-01

    In order to improve the sensibility and location precision of petroleum pipeline leak with traditional negative pressure wave detection, a multi-point distributed detection and location monitoring system composed of detection nodes along pipeline, monitoring sub-stations and pressure monitoring center was designed using C/S structure. The detection node gets the pressure signal in pipeline, and sends it to monitoring center through CPRS network that achieves online monitoring for the whole pipeline in real time. The received data was analyzed and processed with multi-point distributed negative pressure wave detection and correlation analysis method. The system can rapidly detect the leak point in pipeline timely and locate accurately to avoid enormous economic loss and environment pollutions accidents. (author)

  10. Leak detection in pipelines through spectral analysis of pressure signals

    Directory of Open Access Journals (Sweden)

    Souza A.L.

    2000-01-01

    Full Text Available The development and test of a technique for leak detection in pipelines is presented. The technique is based on the spectral analysis of pressure signals measured in pipeline sections where the formation of stationary waves is favoured, allowing leakage detection during the start/stop of pumps. Experimental tests were performed in a 1250 m long pipeline for various operational conditions of the pipeline (liquid flow rate and leakage configuration. Pressure transients were obtained by four transducers connected to a PC computer. The obtained results show that the spectral analysis of pressure transients, together with the knowledge of reflection points provide a simple and efficient way of identifying leaks during the start/stop of pumps in pipelines.

  11. Hazard identification studies applied to oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Savio, Augusto; Alpert, Melina L. [TECNA S.A., Buenos Aires (Argentina)], e-mail: asavio@tecna.com, e-mail: malpert@tecna.com

    2008-07-01

    In order to assess risks inherent to an Oil Pipeline, it is imperative to analyze what happens 'outside the process'. HAZID (HAZard IDentification) studies are mainly carried out for this purpose. HAZID is a formal study which identifies hazards and risks associated to an operation or facility and enable its acceptability assessment. It is a brainstorming exercise guided by a typical 'Checklist', divided into four Sections: External, Facilities and Health Hazards and Issues pertaining to Project Execution, which are further subdivided into Hazard Categories. For each Category, there are 'Guide-words' and 'Prompts'. Even if an Oil Pipeline Risk Assessment can be performed by means of the above referred 'Checklist', carrying out the actual process can become lengthy and annoying due to the lack of specificity. This work aims at presenting the most suitable 'Checklist' for the identification of Oil Pipeline Risk Assessment, although it could be used for Gas Pipeline Risk Assessment too. Prepared ad hoc, this list, is based on the spill causes established by CONCAWE (CONservation of Clean Air Water in Europe). Performing Oil Pipeline Risk Assessment by means of specially formulated Checklist enables the Study Team to easily identify risks, shortens execution time and provides both accuracy and specificity. (author)

  12. Pipesworld : applying planning systems to pipeline transportation

    Energy Technology Data Exchange (ETDEWEB)

    Milidiu, R.L.; Santos Liporace, F. [Pontificia Univ. Catolica, Rio de Janeiro (Brazil). Dept. de Informatica

    2004-07-01

    This paper explored issues facing the complex task of managing pipelines that transport large volumes of petroleum products over long distances. Since oil pipelines are generally a few inches wide and several miles long, reasonable amounts of distinct products can be transported with very small loss due to the mixing at liquid boundaries. Optimizing the transportation through oil pipelines in terms of maintenance and environmental safety is a high priority for pipeline operators. This paper presented the Pipesworld model which takes into account features such as product interface constraints, limited product storage capacities and due dates for product delivery. It has been benchmarked as a start-of-art general purpose artificial planning system. This paper also reported the results derived by general purpose artificial intelligence planning systems when applied to the Pipesworld model. It demonstrated how various modelling techniques can be used to enhance the planners performance. Current work in developing Plumber was also presented. This dedicated solver that addresses operational situations uses both general purpose planning techniques as well as domain specific knowledge. When Plumber was incorporated into Pipesworld, its outperformed Fast-Forward, one of the best available general purpose planning systems, suggesting that improved versions of Plumber have the potential to deal with various problem scenarios in pipeline operations. 11 refs., 2 tabs., 3 figs.

  13. 75 FR 45696 - Pipeline Safety: Personal Electronic Device Related Distractions

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... and operators of natural gas and hazardous liquid pipeline facilities are required to have and follow.... Advisory Bulletin (ADB-10-06) To: Owners and Operators of Hazardous Liquid and Natural Gas Pipeline Systems...

  14. Pipeline coating inspection in Mexico applying surface electromagnetic technology

    Energy Technology Data Exchange (ETDEWEB)

    Delgado, O.; Mousatov, A.; Nakamura, E.; Villarreal, J.M. [Instituto Mexicano del Petroleo (IMP), Mexico City (Mexico); Shevnin, V. [Moscow State University (Russian Federation); Cano, B. [Petroleos Mexicanos (PEMEX), Mexico City (Mexico)

    2009-07-01

    The main problems in the pipeline systems in Mexico include: extremely aggressive soil characterized by a high clay content and low resistivity, interconnection between several pipes, including electrical contacts of active pipelines with out of service pipes, and short distances between pipes in comparison with their depths which reduce the resolution of coating inspection. The results presented in this work show the efficiency of the Surface Electromagnetic Pipeline Inspection (SEMPI) technology to determine the technical condition of pipelines in situations before mentioned. The SEMPI technology includes two stages: regional and detailed measurements. The regional stage consists of magnetic field measurements along the pipeline using large distances (10 - 100 m) between observation points to delimit zones with damaged coating. For quantitative assessing the leakage and coating resistances along pipeline, additional measurements of voltage and soil resistivity measurements are performed. The second stage includes detailed measurements of the electric field on the pipe intervals with anomalous technical conditions identified in the regional stage. Based on the distribution of the coating electric resistance and the subsoil resistivity values, the delimitation of the zones with different grade of coating quality and soil aggressiveness are performed. (author)

  15. Politics, proximity and the pipeline: Mapping public attitudes toward Keystone XL

    International Nuclear Information System (INIS)

    Gravelle, Timothy B.; Lachapelle, Erick

    2015-01-01

    The politics of oil pipelines have become increasingly salient in American politics in recent years. In particular, debates about economic benefits, energy security and environmental impact have been provoked by the proposed Keystone XL pipeline expansion intended to take bitumen from northern Alberta in Canada to refineries on the Gulf Coast in Texas. Drawing on data from recent surveys conducted by the Pew Research Center, this article asks a series of questions. What levels of support for (and opposition to) the pipeline exist among the American public? What are the roles of political factors (such as party identification and ideology), economic attitudes, environmental attitudes and proximity to the proposed pipeline route in shaping attitudes toward the pipeline? And how do political factors and proximity to the pipeline interact? We find that partisanship and ideology drive attitudes toward the Keystone XL pipeline, and that the effect of ideology is attenuated by proximity to the proposed route. The policy implications of these findings for energy infrastructure siting controversies are discussed. -- Highlights: •Americans are divided on the Keystone XL energy pipeline. •Attitudes toward Keystone XL are driven by political party identification and ideology. •Attitudes toward the pipeline are also shaped by attitudes toward the economy and global warming. •The effect of proximity on attitudes toward Keystone XL is non-linear. •Spatial proximity to the pipeline attenuates the effect of ideology

  16. Detection blockages and valve statues in natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, Karl; Short, Gordon; Wang, Xuesong [Pipeline Engineering Ltd, North Yorkshire, (United Kingdom); Lennox, Barry; Lewis, Keith; Turner, John [University of Manchester, Manchester, (United Kingdom); Lewis, Chris [BP exploration, Aberdeen, (United Kingdom)

    2010-07-01

    Detecting features in pipelines containing flowing gas is difficult. This paper investigated a patented acoustic reflectometry technique for detecting defects in gas pipelines. The basic concept of this technique is to inject a pulse of sound into a pipeline and then measure the reflections produced while the signal travels along the length of the pipe. A modification in the internal section of the pipe will produce a reflection which, given with the speed of sound in the gas within the pipeline, provides the location of the feature. Laboratory tests on a 16m rigid PVC pipe and two field trials were undertaken to test this new method. The results showed that acoustic reflectometry can be used to identify features resulting from blockages and leakages. The field tests demonstrated that the method is capable of surveying both small and large diameter pipelines with lengths up to 10 km.

  17. An integrated system for pipeline condition monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Strong, Andrew P.; Lees, Gareth; Hartog, Arthur; Twohig, Richard; Kader, Kamal; Hilton, Graeme; Mullens, Stephen; Khlybov, Artem [Schlumberger, Southampton (United Kingdom); Sanderson, Norman [BP Exploration, Sunbury (United Kingdom)

    2009-07-01

    In this paper we present the unique and innovative 'Integriti' pipeline and flow line integrity monitoring system developed by Schlumberger in collaboration with BP. The system uses optical fiber distributed sensors to provide simultaneous distributed measurements of temperature, strain and vibration for the detection, monitoring, and location of events including: Third Party Interference (TPI), including multiple simultaneous disturbances; geo-hazards and landslides; gas and oil leaks; permafrost protection. The Integriti technology also provides a unique means for tracking the progress of cleaning and instrumented pigs using existing optical telecom and data communications cables buried close to pipelines. The Integriti solution provides a unique and proactive approach to pipeline integrity management. It performs analysis of a combination of measurands to provide the pipeline operator with an event recognition and location capability, in effect providing a hazard warning system, and offering the operator the potential to take early action to prevent loss. Through the use of remote, optically powered amplification, an unprecedented detection range of 100 km is possible without the need for any electronics and therefore remote power in the field. A system can thus monitor 200 km of pipeline when configured to monitor 100 km upstream and downstream from a single location. As well as detecting conditions and events leading to leaks, this fully integrated system provides a means of detecting and locating small leaks in gas pipelines below the threshold of present online leak detection systems based on monitoring flow parameters. Other significant benefits include: potential reductions in construction costs; enhancement of the operator's existing integrity management program; potential reductions in surveillance costs and HSE risks. In addition to onshore pipeline systems this combination of functionality and range is available for practicable

  18. Research on prognostics and health management of underground pipeline

    Science.gov (United States)

    Zhang, Guangdi; Yang, Meng; Yang, Fan; Ni, Na

    2018-04-01

    With the development of the city, the construction of the underground pipeline is more and more complex, which has relation to the safety and normal operation of the city, known as "the lifeline of the city". First of all, this paper introduces the principle of PHM (Prognostics and Health Management) technology, then proposed for fault diagnosis, prognostics and health management in view of underground pipeline, make a diagnosis and prognostics for the faults appearing in the operation of the underground pipeline, and then make a health assessment of the whole underground pipe network in order to ensure the operation of the pipeline safely. Finally, summarize and prospect the future research direction.

  19. Eesti Gaas. Inspection of Kohtal-Jaerve - Tallinn pipeline. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The project `Inspection of Pipelines in Estonia` was funded by Danish government and was carried out in collaboration between DONG, Balslev and FORCE. By agreement between Eesti Gaas and DONG, the pipeline system between Kohtla-Jaerve and Tallinn was selected for inspection. This pipeline system has a total length of 176.9 km. The objective of the project has been, based on detailed inspection of relative short lengths of pipe, to determine the integrity of the pipeline and to give advice concerning the continued use as a high pressure transmission pipeline. The objectives have been met as set out by the project Proposal with the investigation and this report as follows: Based on a document review together with the measurements and observations in the field and in the laboratory, the condition of approximately 5 km of the pipeline has been evaluated; Recommendations are given in this report with the aim of extending the life of the pipeline. A further objective has been to provide know-how transfer in order to permit Eesti Gaas to run similar inspections on other parts of their transmission system. (EG)

  20. Gamma scan technique for detecting coupon inside the mother pipeline

    International Nuclear Information System (INIS)

    Rasif Mohd Zain; Roslan Yahya; Mohamad Rabaie Shari; Airwan Affandi Mahmood; Mior Ahmad Khusaini Adnan

    2012-01-01

    Many times a year natural gas transmission and distribution companies need to make new connections to pipelines to expand or modify their existing system through hot tapping procedure. This procedure involves the installation of a new pipeline connection while the pipeline remains in service, flowing natural gas under pressure. The hot tap procedure includes attaching a branch connection and valve on the outside of an operating pipeline, and then cutting out the pipe-line wall within the branch and removing the wall section, which is called object of coupon through the valve. During the hot tapping process a critical problems occurred when a coupon fell into the mother pipeline. To overcome this problem, a gamma-ray absorption technique was chosen whereby a mapping technique will be done to detect the coupon position. The technique is non-destructive as it applies Co-60 (5 mCi) as a radioisotope sealed source to emit gamma radiation and a NaI(Tl) scintillation as detector. The result provided a visible representation of density profile inside pipeline where the coupon location can be located. This paper provides the detail of the technique used and presents the result obtained. (author)

  1. Study of stress-strain state of pipeline under permafrost conditions

    Science.gov (United States)

    Tarasenko, A. A.; Redutinskiy, M. N.; Chepur, P. V.; Gruchenkova, A. A.

    2018-05-01

    In this paper, the dependences of the stress-strain state and subsidence of pipelines on the dimensions of the subsidence zone are obtained for the sizes of pipes that have become most widespread during the construction of main oil pipelines (530x10, 820x12, 1020x12, 1020x14, 1020x16, 1220x14, 1220x16, 1220x18 mm). True values of stresses in the pipeline wall, as well as the exact location of maximum stresses for the interval of subsidence zones from 5 to 60 meters, are determined. For this purpose, the authors developed a finite element model of the pipeline that takes into account the actual interaction of the pipeline with the subgrade and allows calculating the SSS of the structure for a variable subsidence zone. Based on the obtained dependences for the underground laying of oil pipelines in permafrost areas, it is proposed to artificially limit the zone of possible subsidence by separation supports from the soil with higher building properties and physical-mechanical parameters. This technical solution would significantly reduce costs when constructing new oil pipelines in permafrost areas.

  2. Environmental impact assessment in the pipeline industry. Experiences with the UK north western ethylene pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Ryde, A.

    1997-12-31

    The north western ethylene pipeline is the final link between Shell`s oil and gas fields in the North Sea and its petrochemical complexes in Cheshire. The natural gas from which ethylene is obtained comes from the Brent and central fields in the North Sea. Environmental impacts are discussed in this paper covering topics as follow: Regulatory and legal aspects; environmental assessment during planning and design; environmental control during construction; environmental management during operation; environmental controls at sensitive sites on the north western ethylene pipeline: some examples. 11 refs., 2 figs.

  3. Environmental impact assessment in the pipeline industry. Experiences with the UK north western ethylene pipeline

    International Nuclear Information System (INIS)

    Ryder, A.

    1997-01-01

    The north western ethylene pipeline is the final link between Shell's oil and gas fields in the North Sea and its petrochemical complexes in Cheshire. The natural gas from which ethylene is obtained comes from the Brent and central fields in the North Sea. Environmental impacts are discussed in this paper covering topics as follow: Regulatory and legal aspects; environmental assessment during planning and design; environmental control during construction; environmental management during operation; environmental controls at sensitive sites on the north western ethylene pipeline: some examples. 11 refs., 2 figs

  4. 75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop

    Science.gov (United States)

    2010-11-02

    ... regulations to address human factors and other aspects of control room management for certain pipelines where controllers use supervisory control and data acquisition (SCADA) systems. Under the final rule, pipeline... Washington, DC on October 22, 2010. Jeffrey D. Wiese, Associate Administrator for Pipeline Safety. [FR Doc...

  5. 77 FR 21763 - Explorer Pipeline Company; Notice of Petition for Declaratory Order

    Science.gov (United States)

    2012-04-11

    ... pipeline extension project (Diluent Extension Project). The Diluent Extension Project involves the construction of a new pipeline segment from Peotone, Illinois to Manhattan, Illinois, where Explorer's pipeline system will interconnect with Enbridge's Southern Lights pipeline. This extension project will offer a...

  6. Pipeline oil fire detection with MODIS active fire products

    Science.gov (United States)

    Ogungbuyi, M. G.; Martinez, P.; Eckardt, F. D.

    2017-12-01

    We investigate 85 129 MODIS satellite active fire events from 2007 to 2015 in the Niger Delta of Nigeria. The region is the oil base for Nigerian economy and the hub of oil exploration where oil facilities (i.e. flowlines, flow stations, trunklines, oil wells and oil fields) are domiciled, and from where crude oil and refined products are transported to different Nigerian locations through a network of pipeline systems. Pipeline and other oil facilities are consistently susceptible to oil leaks due to operational or maintenance error, and by acts of deliberate sabotage of the pipeline equipment which often result in explosions and fire outbreaks. We used ground oil spill reports obtained from the National Oil Spill Detection and Response Agency (NOSDRA) database (see www.oilspillmonitor.ng) to validate MODIS satellite data. NOSDRA database shows an estimate of 10 000 spill events from 2007 - 2015. The spill events were filtered to include largest spills by volume and events occurring only in the Niger Delta (i.e. 386 spills). By projecting both MODIS fire and spill as `input vector' layers with `Points' geometry, and the Nigerian pipeline networks as `from vector' layers with `LineString' geometry in a geographical information system, we extracted the nearest MODIS events (i.e. 2192) closed to the pipelines by 1000m distance in spatial vector analysis. The extraction process that defined the nearest distance to the pipelines is based on the global practices of the Right of Way (ROW) in pipeline management that earmarked 30m strip of land to the pipeline. The KML files of the extracted fires in a Google map validated their source origin to be from oil facilities. Land cover mapping confirmed fire anomalies. The aim of the study is to propose a near-real-time monitoring of spill events along pipeline routes using 250 m spatial resolution of MODIS active fire detection sensor when such spills are accompanied by fire events in the study location.

  7. V-GAP: Viral genome assembly pipeline

    KAUST Repository

    Nakamura, Yoji

    2015-10-22

    Next-generation sequencing technologies have allowed the rapid determination of the complete genomes of many organisms. Although shotgun sequences from large genome organisms are still difficult to reconstruct perfect contigs each of which represents a full chromosome, those from small genomes have been assembled successfully into a very small number of contigs. In this study, we show that shotgun reads from phage genomes can be reconstructed into a single contig by controlling the number of read sequences used in de novo assembly. We have developed a pipeline to assemble small viral genomes with good reliability using a resampling method from shotgun data. This pipeline, named V-GAP (Viral Genome Assembly Pipeline), will contribute to the rapid genome typing of viruses, which are highly divergent, and thus will meet the increasing need for viral genome comparisons in metagenomic studies.

  8. V-GAP: Viral genome assembly pipeline

    KAUST Repository

    Nakamura, Yoji; Yasuike, Motoshige; Nishiki, Issei; Iwasaki, Yuki; Fujiwara, Atushi; Kawato, Yasuhiko; Nakai, Toshihiro; Nagai, Satoshi; Kobayashi, Takanori; Gojobori, Takashi; Ototake, Mitsuru

    2015-01-01

    Next-generation sequencing technologies have allowed the rapid determination of the complete genomes of many organisms. Although shotgun sequences from large genome organisms are still difficult to reconstruct perfect contigs each of which represents a full chromosome, those from small genomes have been assembled successfully into a very small number of contigs. In this study, we show that shotgun reads from phage genomes can be reconstructed into a single contig by controlling the number of read sequences used in de novo assembly. We have developed a pipeline to assemble small viral genomes with good reliability using a resampling method from shotgun data. This pipeline, named V-GAP (Viral Genome Assembly Pipeline), will contribute to the rapid genome typing of viruses, which are highly divergent, and thus will meet the increasing need for viral genome comparisons in metagenomic studies.

  9. Influence of remanent magnetization on pitting corrosion in pipeline steel

    Energy Technology Data Exchange (ETDEWEB)

    Espina-Hernandez, J. H. [ESIME Zacatenco, SEPI Electronica Instituto Politecnico Nacional Mexico, D. F. (Mexico); Caleyo, F.; Hallen, J. M. [DIM-ESIQIE, Instituto Politecnico Nacional Mexico D. F. (Mexico); Lopez-Montenegro, A.; Perez-Baruch, E. [Pemex Exploracion y Produccion, Region Sur Villahermosa, Tabasco (Mexico)

    2010-07-01

    Statistical studies performed in Mexico indicate that leakage due to external pitting corrosion is the most likely cause of failure of buried pipelines. When pipelines are inspected with the magnetic flux leakage (MFL) technology, which is routinely used, the magnetization level of every part of the pipeline changes as the MFL tool travels through it. Remanent magnetization stays in the pipeline wall after inspection, at levels that may differ from a point to the next. This paper studies the influence of the magnetic field on pitting corrosion. Experiments were carried out on grade 52 steel under a level of remanent magnetization and other laboratory conditions that imitated the conditions of a pipeline after an MLF inspection. Non-magnetized control samples and magnetized samples were subjected to pitting by immersion in a solution containing chlorine and sulfide ions for seven days, and then inspected with optical microscopy. Results show that the magnetic field in the pipeline wall significantly increases pitting corrosion.

  10. A method of quantitative risk assessment for transmission pipeline carrying natural gas

    International Nuclear Information System (INIS)

    Jo, Young-Do; Ahn, Bum Jong

    2005-01-01

    Regulatory authorities in many countries are moving away from prescriptive approaches for keeping natural gas pipelines safe. As an alternative, risk management based on a quantitative assessment is being considered to improve the level of safety. This paper focuses on the development of a simplified method for the quantitative risk assessment for natural gas pipelines and introduces parameters of fatal length and cumulative fatal length. The fatal length is defined as the integrated fatality along the pipeline associated with hypothetical accidents. The cumulative fatal length is defined as the section of pipeline in which an accident leads to N or more fatalities. These parameters can be estimated easily by using the information of pipeline geometry and population density of a Geographic Information Systems (GIS). To demonstrate the proposed method, individual and societal risks for a sample pipeline have been estimated from the historical data of European Gas Pipeline Incident Data Group and BG Transco. With currently acceptable criteria taken into account for individual risk, the minimum proximity of the pipeline to occupied buildings is approximately proportional to the square root of the operating pressure of the pipeline. The proposed method of quantitative risk assessment may be useful for risk management during the planning and building stages of a new pipeline, and modification of a buried pipeline

  11. Operating experience with gas-bearing circulators in a high-pressure helium loop

    International Nuclear Information System (INIS)

    Sanders, J.P.; Gat, U.; Young, H.C.

    1988-01-01

    A high-pressure engineering test loop has been designed and constructed at the Oak Ridge National Laboratory for circulating helium through a test chamber at temperatures to 1,000 deg. C. The purpose of this loop is to determine the thermal and structural performance of proposed components for the primary loops of gas-cooled nuclear reactors. Three gas-bearing circulators, mounted in series, provide a maximum volumetric flow of 0.47 m 3 /s and a maximum head of 78 kJ/kg at operating pressures from 0.1 to 10.7 MPa. Control of gaseous impurities in the circulating gas was the significant operating requirement that dictated the choice of a circulator that is lubricated by the circulating gas. The motor for each circulator is contained within the pressure boundary, and it is cooled by circulating the gas in the motor cavity over water-cooled coils. Each motor is rated at 200 kW at a speed of 23,500 rpm. The circulators have been operated in the loop for more than 5,000 h. The flow of the gas in the loop is controlled by varying the speed of the circulators through the use of individual 250-kVA, solid state power supplies that can be continuously varied in frequency from 50 to 400 Hz. To prevent excessive wear on the gas bearings during startup, the circulator motor accelerates the rotor to 3,000 rpm in less than one second. During operation, no problems associated with the gas bearings, per se, were encountered; however, related problems pointed to design considerations that should be included in future applications of circulators of this type. The primary test that has been conducted in this loop required sustained operation for several weeks without interruption. After a number of unscheduled interruptions, the operating goals were attained. During part of this period, the loop was operated with only two circulators installed in the pressure vessels with a guard installed in the third vessel to protect the closure flange from the gas temperatures. Unattended

  12. A multiple-pass ring oscillator based dual-loop phase-locked loop

    International Nuclear Information System (INIS)

    Chen Danfeng; Ren Junyan; Deng Jingjing; Li Wei; Li Ning

    2009-01-01

    A dual-loop phase-locked loop (PLL) for wideband operation is proposed. The dual-loop architecture combines a coarse-tuning loop with a fine-tuning one, enabling a wide tuning range and low voltage-controlled oscillator (VCO) gain without poisoning phase noise and reference spur suppression performance. An analysis of the phase noise and reference spur of the dual-loop PLL is emphasized. A novel multiple-pass ring VCO is designed for the dual-loop application. It utilizes both voltage-control and current-control simultaneously in the delay cell. The PLL is fabricated in Jazz 0.18-μm RF CMOS technology. The measured tuning range is from 4.2 to 5.9 GHz. It achieves a low phase noise of -99 dBc/Hz - 1 MHz offset from a 5.5 GHz carrier.

  13. A multiple-pass ring oscillator based dual-loop phase-locked loop

    Energy Technology Data Exchange (ETDEWEB)

    Chen Danfeng; Ren Junyan; Deng Jingjing; Li Wei; Li Ning, E-mail: dfchen@fudan.edu.c [State Key Laboratory of ASIC and System, Fudan University, Shanghai 201203 (China)

    2009-10-15

    A dual-loop phase-locked loop (PLL) for wideband operation is proposed. The dual-loop architecture combines a coarse-tuning loop with a fine-tuning one, enabling a wide tuning range and low voltage-controlled oscillator (VCO) gain without poisoning phase noise and reference spur suppression performance. An analysis of the phase noise and reference spur of the dual-loop PLL is emphasized. A novel multiple-pass ring VCO is designed for the dual-loop application. It utilizes both voltage-control and current-control simultaneously in the delay cell. The PLL is fabricated in Jazz 0.18-{mu}m RF CMOS technology. The measured tuning range is from 4.2 to 5.9 GHz. It achieves a low phase noise of -99 dBc/Hz - 1 MHz offset from a 5.5 GHz carrier.

  14. Simulation of high consequence areas for gas pipelines

    Directory of Open Access Journals (Sweden)

    Orlando Díaz-Parra

    2018-01-01

    Full Text Available The gas pipeline is used for the transport of natural gas at a great distance. Risks derived from the handling of a combustible material transported under high pressure, by pipelines that pass close to where people live, makes it necessary to adopt prevention, mitigation and control measures to reduce the effect in case of ignition of a gas leak. This work shows the development of a new mathematical model to determine areas of high consequence and their application, using widely available and easy to use software, such as Google Earth and Excel, to determine and visualize the area up to which the level of radiation can affect the integrity of people and buildings. The model takes into account the pressure drop into the gas pipeline from the compression station, the gas leakage rate and possible forms of gas ignition. This development is an alternative to the use of specialized software and highly trained personnel. The simulation is applied to a traced of the Miraflores-Tunja gas pipeline, using a macro developed in Excel to determine the impact area and compare it with the coordinates of the vulnerable areas. The zones where these areas intersect are constituted in high consequence areas and are identified along with the sections of the pipeline that affect them, to provide the operator with a risk analysis tool for the determination and visualization of the gas pipeline and its environment.

  15. Space Maintenance with an Innovative ?Tube and Loop? Space Maintainer (Nikhil Appliance)

    OpenAIRE

    Srivastava, Nikhil; Grover, Jyotika; Panthri, Prerna

    2016-01-01

    ABSTRACT Despite the best efforts in prevention, premature loss of primary teeth continues to be a common problem in pediatric dentistry, resulting in disruption of arch integrity and adversely affecting the proper alignment of permanent successors. Space maintainers (SMs) are special appliances used for maintaining space created due to premature loss of primary teeth. Band and loop SM is mostly indicated for the premature loss of single primary molar, but this appliance has a number of limit...

  16. Feasibility study on rehabilitation and optimization of gas pipeline network/system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a survey was conducted on repairs and optimization of gas pipeline net/system in Bangladesh. In the survey, the measurement of methane gas concentration, wind direction/velocity and temperature was made for 16 stations of BC pipeline and BD pipeline including Ring Line. As a result of the measurement, the amount of methane leakage totaled 5,300 tons/year including 1,300 tons in BD pipeline, 2,500 tons in BC pipeline and 1,500 tons in Ring Line. For repairs/optimization of the pipeline net/system, the necessity of the following was pointed out: exchanges of gaskets, piping and valves; repairs of portions of the pipeline exposure; exchanges of pressure control valves and flowmeters; repair of the corrosion prevention system. In this improvement project, the reduction amount of greenhouse effect gas emissions will be 5,300 tons/year and approximately 106,000 tons in 20 years. The conservation will amount to 0.66 MMUS$/year. (NEDO)

  17. Sequence-structure relationships in RNA loops: establishing the basis for loop homology modeling.

    Science.gov (United States)

    Schudoma, Christian; May, Patrick; Nikiforova, Viktoria; Walther, Dirk

    2010-01-01

    The specific function of RNA molecules frequently resides in their seemingly unstructured loop regions. We performed a systematic analysis of RNA loops extracted from experimentally determined three-dimensional structures of RNA molecules. A comprehensive loop-structure data set was created and organized into distinct clusters based on structural and sequence similarity. We detected clear evidence of the hallmark of homology present in the sequence-structure relationships in loops. Loops differing by structures. Thus, our results support the application of homology modeling for RNA loop model building. We established a threshold that may guide the sequence divergence-based selection of template structures for RNA loop homology modeling. Of all possible sequences that are, under the assumption of isosteric relationships, theoretically compatible with actual sequences observed in RNA structures, only a small fraction is contained in the Rfam database of RNA sequences and classes implying that the actual RNA loop space may consist of a limited number of unique loop structures and conserved sequences. The loop-structure data sets are made available via an online database, RLooM. RLooM also offers functionalities for the modeling of RNA loop structures in support of RNA engineering and design efforts.

  18. Out on the tar sands mainline : mapping Enbridge's web of pipelines : a corporate profile of pipeline company Enbridge

    Energy Technology Data Exchange (ETDEWEB)

    Girard, R.; Davis, T.R. [Polaris Institute, Ottawa, ON (Canada)

    2010-05-15

    This document described Enbridge's operations, economic situation, political connections, and its social and environmental track record. It explored the social cost of operating refineries and pipelines in First Nations communities and the environment. It also raised concerns regarding future plans to open up Asian markets to oil sand crude via the Gateway pipeline. This profile included specific details on recurring pipeline leaks that have caused environmental damage; the ongoing expropriation of First Nations land; widespread political lobbying and influence in Canada and the United States; and interference in local community decision-making through financial contributions and projects. refs., tabs., figs.

  19. Natural gas transport with the aid of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Volk, A

    1978-01-01

    After giving a brief explanation on the term natural gas and the chemical composition of natural gases of different origin, the natural gas supply in the FRG and in Western Europe is discussed. Other discussions are included on: (1) planning, construction, and operation of the pipelines; (2) the equipment for pressure increase and the telecommunication equipment which are urgently necessary for gas transport through pipelines; (3) the problem of safety both in connection with the supply and protection of man and material; and (4) problems of profitability of natural gas transport through pipelines.

  20. MEXICO loop provides essential technology for MYRRHA. SCK•CEN investigates the chemistry of lead-bismuth

    International Nuclear Information System (INIS)

    2014-01-01

    In the MYRRHA facility, Lead-Bismuth Eutectic (LBE) alloy will act as the primary coolant. There are different experimental lead-bismuth loops in the world. Most have been designed to study steel corrosion in LBE or the thermohydraulics of LBE. The article discusses the MEXICO test loop, which has been developed by SCK-CEN to investigate the chemistry of leadbismuth.