WorldWideScience

Sample records for previously scheduled three-week

  1. Gemcitabine and cisplatin in locally advanced and metastatic bladder cancer; 3- or 4-week schedule?

    DEFF Research Database (Denmark)

    Als, Anne Birgitte; Sengeløv, Lisa; Von Der Maase, Hans

    2008-01-01

    BACKGROUND: Chemotherapy with gemcitabine and cisplatin (GC) is an active regimen in advanced transitional cell carcinoma (TCC). Traditionally, GC has been administered as a 4-week schedule. However, an alternative 3-week schedule may be more feasible. Long-term survival data for the alternative 3......-week schedule and comparisons of the feasibility and toxicity between the two schedules have not previously been published. MATERIAL AND METHODS: We performed a retrospective analysis of patients with stage IV TCC, treated with GC by a standard 4-week or by an alternative 3-week schedule. RESULTS...

  2. Impact of previous extended and daily wear schedules on signs and symptoms with high Dk lotrafilcon A lenses.

    Science.gov (United States)

    Chalmers, Robin L; Dillehay, Sally; Long, Bill; Barr, Joseph T; Bergenske, Peter; Donshik, Peter; Secor, Glenda; Yoakum, John

    2005-06-01

    This study measured the impact of previous contact lens wearing schedule on the resolution of signs and contact lens-related symptoms among wearers of lotrafilcon A lenses. One hundred forty adapted low Dk daily wear (DW) and 140 adapted low Dk extended wear (EW) subjects were enrolled and examined for 1 year (overall study length is 3 years). All subjects wore lotrafilcon A lenses on a wearing schedule of up to 30 nights continuous wear with monthly replacement of lenses. Examinations were conducted at 1 week, 1, 6, and 12 months. The former EW wearers presented at baseline with significantly higher conjunctival staining and epithelial microcysts (p Dk DW and EW wearers within 1 week as did severity of dryness during the day for the former DW wearers, in part as a result of their higher prevalence at baseline in the DW group. Subjects reported redness improved significantly by the 1-month visit. Continuous wear of high Dk silicone hydrogel lenses resulted in an improvement in ocular redness and neovascularization and dryness symptoms among subjects in this trial, regardless of their previous low Dk lens-wearing schedule. All improvements in signs and symptoms were sustained through 12 months.

  3. Adjuvant chemotherapy with 5-fluorouracil, L-folinic acid and levamisole for patients with colorectal cancer: non-randomised comparison of weekly versus four-weekly schedules--less pain, same gain. QUASAR Colorectal Cancer Study Group.

    Science.gov (United States)

    Kerr, D J; Gray, R; McConkey, C; Barnwell, J

    2000-08-01

    QUASAR is a large trial of adjuvant chemotherapy for colorectal cancer in which clinicians could choose to deliver a standard adjuvant cytotoxic chemotherapy regimen, 5-fluorouracil (5-FU) and L-folinic acid (L-FA), in either a once-weekly or a four-weekly schedule. We report results of a non-randomised comparison between these schedules with respect to survival, recurrence and differential toxicity. In a factorial (2 x 2) trial design, QUASAR compared high-dose (175 mg) versus low-dose (25 mg) L-FA and levamisole versus placebo. The dose of 5-FU was fixed at 370 mg/m2 and although the recommended schedule was i.v. bolus delivery, daily for 5 days repeated four-weekly for 6 months, a significant proportion of randomising clinicians were constrained to deliver once-weekly 5-FU-L-FA for 30 weeks. Four thousand nine hundred twenty-seven patients were entered into QUASAR between May 1994 and October 1997, eighteen hundred twenty-nine of whom have recurred and sixteen hundred eighty-nine died. Similar numbers 2370 vs. 2559 were treated with the once-weekly and four-weekly schedules and the demographic features of the 2 groups were well balanced: stage C, 73.3% once-weekly vs. 71.0% four-weekly; colon, 68.0% vs. 68.3%; high-dose FA, 50.1% vs. 49.9%; levamisole, 49.3% vs. 49.3%; females, 40.2% vs. 41.7%; median age (years) 62 vs. 61. The risk of recurrence and survival were similar regardless of schedule: three-year survival was 70.6% once-weekly vs. 71.0% four-weekly; three-year recurrence risk was 35.6% once-weekly vs. 35.5% four-weekly; But, the once-weekly regimen was much less toxic: number of patients for whom toxicity was reported (once-weekly: four-weekly), stomatitis, 37 vs. 337; diarrhoea, 260 vs. 440; neutropenia, 20 vs. 153. The once-weekly regimen is much less toxic than and, apparently, about as effective as the four-weekly schedule. This suggests that the toxicity of 5-FU-L-FA adjuvant chemotherapy could be reduced substantially by weekly scheduling without

  4. A randomised, double-blind, placebo-controlled, crossover study to assess the efficacy and safety of three dosing schedules of agalsidase alfa enzyme replacement therapy for Fabry disease.

    Science.gov (United States)

    Hughes, D A; Deegan, P B; Milligan, A; Wright, N; Butler, L H; Jacobs, A; Mehta, A B

    2013-07-01

    Anecdotal reports suggest that the currently approved dosing interval of agalsidase alfa (0.2 mg/kg/2 weeks) for Fabry disease treatment is too long. This randomised, double-blind, placebo-controlled, crossover study investigated three altered dosing intervals. 18 Fabry patients received three agalsidase alfa dosing schedules, each for four weeks (A: 0.2 mg/kg∗2 weeks, B: 0.1 mg/kg/week, C: 0.2 mg/kg/week). Health state, pain levels, sweat volume and latency and plasma and urinary globotriaosylceramide levels were recorded throughout the study. No significant differences were found among the schedules for the primary efficacy outcome of self-assessed health state, or for pain scores. A trend toward increased sweat volume on QSART testing, and reduced urine globotriaosylceramide concentration were seen with treatment schedule C. Agalsidase alfa was safe and well tolerated with all schedules. In conclusion, the primary analyses did not find weekly infusions of agalsidase alfa to be statistically better than the approved dosing schedule however the data indicates that further studies with more patients over a longer period are required to more accurately determine the optimum dose and schedule. Copyright © 2013 Elsevier Inc. All rights reserved.

  5. Optimizing an F-16 Squadron Weekly Pilot Schedule for the Turkish Air Force

    Science.gov (United States)

    2010-03-01

    disrupted schedules are rescheduled , minimizing the total number of changes with respect to the previous schedule’s objective function. Output...producing rosters for a nursing staff in a large general hospital (Dowsland, 1998) and afterwards Aickelin and Dowsland use an Indirect Genetic...algorithm to improve the solutions of the nurse scheduling problem which is similar to the fighter squadron pilot scheduling problem (Aickelin and

  6. Self-Reported Recovery from 2-Week 12-Hour Shift Work Schedules: A 14-Day Follow-Up

    NARCIS (Netherlands)

    Merkus, S.L.; Holte, K.A.; Huysmans, M.A.; van de Ven, P.M.; van Mechelen, W.; van der Beek, A.J.

    2015-01-01

    Background Recovery from fatigue is important in maintaining night workers' health. This study compared the course of self-reported recovery after 2-week 12-hour schedules consisting of either night shifts or swing shifts (i.e., 7 night shifts followed by 7 day shifts) to such schedules consisting

  7. Hepatitis B vaccination in prison with a 3-week schedule is more efficient than the standard 6-month schedule

    DEFF Research Database (Denmark)

    Christensen, Peer B; Fisker, Niels; Krarup, Henrik B

    2004-01-01

    A randomized study of injecting drug users in a Danish prison comparing vaccination at 0, 1 and 3 weeks with the 0, 1 and 6 months schedule (20microg Engerix B i.m.) was conducted. Due to a low participation rate, a second nonrandomized study was conducted in Estonia where all prisoners were vacc...

  8. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  9. Gastrointestinal tolerability with ibandronate after previous weekly bisphosphonate treatment.

    Science.gov (United States)

    Derman, Richard; Kohles, Joseph D; Babbitt, Ann

    2009-01-01

    Data from two open-label trials (PRIOR and CURRENT) of women with postmenopausal osteoporosis or osteopenia were evaluated to assess whether monthly oral and quarterly intravenous (IV) ibandronate dosing improved self-reported gastrointestinal (GI) tolerability for patients who had previously experienced GI irritation with bisphosphonate (BP) use. In PRIOR, women who had discontinued daily or weekly BP treatment due to GI intolerance received monthly oral or quarterly IV ibandronate for 12 months. The CURRENT subanalysis included women receiving weekly BP treatment who switched to monthly oral ibandronate for six months. GI symptom severity and frequency were assessed using the Osteoporosis Patient Satisfaction Questionnaire. In PRIOR, mean GI tolerability scores increased significantly at month 1 from screening for both treatment groups (oral: 79.3 versus 54.1; IV: 84.4 versus 51.0; p 90% at Month 10). In the CURRENT subanalysis >60% of patients reported improvements in heartburn or acid reflux and >70% indicated improvement in other stomach upset at month 6. Postmenopausal women with GI irritability with daily or weekly BPs experienced improvement in symptoms with extended dosing monthly or quarterly ibandronate compared with baseline.

  10. Timing of planned repeat cesarean delivery after two or more previous cesarean sections--risk for unplanned cesarean delivery and pregnancy outcome.

    Science.gov (United States)

    Melamed, Nir; Hadar, Eran; Keidar, Liron; Peled, Yoav; Wiznitzer, Arnon; Yogev, Yariv

    2014-03-01

    objective: To assess the effect of the scheduled gestational age for a repeat planned cesarean section (CS) on the risk for adverse pregnancy outcome in women with two or more previous CS. A retrospective cohort study of all women after ≥2 previous CS who were scheduled for a repeat planned CS. Women were divided into two groups at which the planned CS was scheduled: 38-week group or 39-week group. Overall, 377 were enrolled, 264 (70.0%) and 113 (30.0%) in the 38-week and the 39-week groups, respectively. The rate of an unplanned CS was significantly higher in the 39-week versus the 38-week group (23.0% versus 13.3%, p = 0.02). A repeat planned CS scheduled to week 39 was associated with an increased risk of maternal adverse outcome (31.9% versus 21.6%, p = 0.03). There was no significant difference in the rate of adverse neonatal outcome between the two groups (20.8% versus 23.0%, p = 0.5). The lowest rate of any adverse outcome (maternal and/or neonatal) was observed when CS was scheduled to 38 + 1 weeks of gestation. In women after two cesarean sections, scheduling a planned CS at around 39 weeks compared with at around 38 weeks is associated with an increased risk for maternal adverse outcome with no apparent advantage in terms of neonatal outcome.

  11. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  12. Gastrointestinal tolerability with ibandronate after previous weekly bisphosphonate treatment

    Directory of Open Access Journals (Sweden)

    Richard Derman

    2009-09-01

    Full Text Available Richard Derman1, Joseph D Kohles2, Ann Babbitt31Department of Obstetrics and Gynecology, Christiana Hospital, Newark, DE, USA; 2Roche, Nutley, NJ, USA; 3Greater Portland Bone and Joint Specialists, Portland, ME, USAAbstract: Data from two open-label trials (PRIOR and CURRENT of women with postmenopausal osteoporosis or osteopenia were evaluated to assess whether monthly oral and quarterly intravenous (IV ibandronate dosing improved self-reported gastrointestinal (GI tolerability for patients who had previously experienced GI irritation with bisphosphonate (BP use. In PRIOR, women who had discontinued daily or weekly BP treatment due to GI intolerance received monthly oral or quarterly IV ibandronate for 12 months. The CURRENT subanalysis included women receiving weekly BP treatment who switched to monthly oral ibandronate for six months. GI symptom severity and frequency were assessed using the Osteoporosis Patient Satisfaction Questionnaire™. In PRIOR, mean GI tolerability scores increased significantly at month 1 from screening for both treatment groups (oral: 79.3 versus 54.1; IV: 84.4 versus 51.0; p < 0.001 for both. Most patients reported improvement in GI symptom severity and frequency from baseline at all post-screening assessments (>90% at Month 10. In the CURRENT subanalysis >60% of patients reported improvements in heartburn or acid reflux and >70% indicated improvement in other stomach upset at month 6. Postmenopausal women with GI irritability with daily or weekly BPs experienced improvement in symptoms with extended dosing monthly or quarterly ibandronate compared with baseline.Keywords: ibandronate, osteoporosis, bisphosphonate, gastrointestinal

  13. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  14. Self-Reported Recovery from 2-Week 12-Hour Shift Work Schedules: A 14-Day Follow-Up.

    Science.gov (United States)

    Merkus, Suzanne L; Holte, Kari Anne; Huysmans, Maaike A; van de Ven, Peter M; van Mechelen, Willem; van der Beek, Allard J

    2015-09-01

    Recovery from fatigue is important in maintaining night workers' health. This study compared the course of self-reported recovery after 2-week 12-hour schedules consisting of either night shifts or swing shifts (i.e., 7 night shifts followed by 7 day shifts) to such schedules consisting of only day work. Sixty-one male offshore employees-20 night workers, 16 swing shift workers, and 25 day workers-rated six questions on fatigue (sleep quality, feeling rested, physical and mental fatigue, and energy levels; scale 1-11) for 14 days after an offshore tour. After the two night-work schedules, differences on the 1(st) day (main effects) and differences during the follow-up (interaction effects) were compared to day work with generalized estimating equations analysis. After adjustment for confounders, significant main effects were found for sleep quality for night workers (1.41, 95% confidence interval 1.05-1.89) and swing shift workers (1.42, 95% confidence interval 1.03-1.94) when compared to day workers; their interaction terms were not statistically significant. For the remaining fatigue outcomes, no statistically significant main or interaction effects were found. After 2-week 12-hour night and swing shifts, only the course for sleep quality differed from that of day work. Sleep quality was poorer for night and swing shift workers on the 1(st) day off and remained poorer for the 14-day follow-up. This showed that while working at night had no effect on feeling rested, tiredness, and energy levels, it had a relatively long-lasting effect on sleep quality.

  15. Schedules of controlled substances: temporary placement of three synthetic cannabinoids into Schedule I. Final order.

    Science.gov (United States)

    2013-05-16

    The Deputy Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to temporarily schedule three synthetic cannabinoids under the Controlled Substances Act (CSA) pursuant to the temporary scheduling provisions of 21 U.S.C. 811(h). The substances are (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48). This action is based on a finding by the Deputy Administrator that the placement of these synthetic cannabinoids and their salts, isomers and salts of isomers into Schedule I of the CSA is necessary to avoid an imminent hazard to the public safety. As a result of this order, the full effect of the CSA and the Controlled Substances Import and Export Act (CSIEA) and their implementing regulations including criminal, civil and administrative penalties, sanctions and regulatory controls of Schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic cannabinoids.

  16. Time-Dependent Kinetics of Tretinoin in Chronic Myelogenous Leukaemia during Intermittent Dose Scheduling: 1 Week On/1 Week Off.

    Science.gov (United States)

    Regazzi, M B; Russo, D; Iacona, I; Sacchi, S; Visani, G; Lazzarino, M; Avvisati, G; Pelicci, P G; Dastoli, G; Grandi, C; Spreafico, S; Grattoni, R; Galieni, P; Rupoli, S; Maiolo, A M; Guerra, E; Liberati, A M

    1998-01-01

    in the drug half-life demonstrated that the presystemic extraction of tretinoin is the main cause of the marked decline in plasma drug exposure. The favourable pharmacokinetic profile of tretinoin obtained by an intermittent regimen, 1 week on/1 week off therapy (vs continuous administration), suggests that such a therapeutic schedule is the most appropriate for the assessment of clinical efficacy in those pathologies in which its use is suitable.

  17. Results of a 5-Week Schedule of Modern Total Skin Electron Beam Radiation Therapy

    Energy Technology Data Exchange (ETDEWEB)

    Morris, Stephen Lloyd, E-mail: stephen.morris@gstt.nhs.uk [St Johns Institute of Dermatology, Guys and St Thomas Hospital, London (United Kingdom); McGovern, Mark; Bayne, Sally; Wain, Mary; Child, Fiona; Whittaker, Sean [St Johns Institute of Dermatology, Guys and St Thomas Hospital, London (United Kingdom)

    2013-08-01

    Purpose: To report the outcomes of a 5-week schedule of total skin electron beam radiation therapy (TSEB) for mycosis fungoides (MF). Methods: Over 5 years, 41 patients with confirmed MF were treated with a modern TSEB technique delivering 30 Gy in 20 fractions over 5 weeks to the whole skin surface. Data were collected prospectively and entered into the skin tumor unit research database. Skin modified skin weighted assessment tool score data were collected to determine response, duration of response, survival, and toxicity. The outcomes were analyzed according to the patient's stage before TSEB, prognostic factors, and adjuvant treatments. Results: Seventeen patients were stage 1B, 19 were stage IIB, 3 were stage III, and 2 were stage IV. The overall response rate was 95%, with a complete response rate of 51%. Seventy-six percent of patients had relapsed at median follow-up of 18 months. The median time to relapse was 12 months, to systemic therapy was 15 months, and to modified skin weighted assessment tool progression above baseline was 44 months. The complete response rate was 59% in stage IB and 47% in stage IIB patients. The median time to skin relapse was longer in stage IB compared with stage IIB, 18 months versus 9 months. The median time to systemic therapy was longer in stage IB compared with stage IIB, >56 months versus 8 months. The median overall survival was 35 months: >56 months for stage IB, 25 months for stage IIB, 46 months for stage III, and 23.5 months for stage IV. Fifteen patients received adjuvant psoralen + ultraviolet A treatment with no difference seen in the time to relapse. Conclusions: This 5-week schedule of TSEB for MF has a high response rate with comparable duration of response to other regimens. Future studies are needed to find adjuvant and combination treatments to improve the duration of response.

  18. Preoperative chemoradiation for locally advanced rectal cancer: comparison of three radiation dose and fractionation schedules

    International Nuclear Information System (INIS)

    Park, Shin Hyung; Kim, Jae Chul

    2016-01-01

    The standard radiation dose for patients with locally rectal cancer treated with preoperative chemoradiotherapy is 45–50 Gy in 25–28 fractions. We aimed to assess whether a difference exists within this dose fractionation range. A retrospective analysis was performed to compare three dose fractionation schedules. Patients received 50 Gy in 25 fractions (group A), 50.4 Gy in 28 fractions (group B), or 45 Gy in 25 fractions (group C) to the whole pelvis, as well as concurrent 5-fluorouracil. Radical resection was scheduled for 8 weeks after concurrent chemoradiotherapy. Between September 2010 and August 2013, 175 patients were treated with preoperative chemoradiotherapy at our institution. Among those patients, 154 were eligible for analysis (55, 50, and 49 patients in groups A, B, and C, respectively). After the median follow-up period of 29 months (range, 5 to 48 months), no differences were found between the 3 groups regarding pathologic complete remission rate, tumor regression grade, treatment-related toxicity, 2-year locoregional recurrence-free survival, distant metastasis-free survival, disease-free survival, or overall survival. The circumferential resection margin width was a prognostic factor for 2-year locoregional recurrence-free survival, whereas ypN category was associated with distant metastasis-free survival, disease-free survival, and overall survival. High tumor regression grading score was correlated with 2-year distant metastasis-free survival and disease-free survival in univariate analysis. Three different radiation dose fractionation schedules, within the dose range recommended by the National Comprehensive Cancer Network, had no impact on pathologic tumor regression and early clinical outcome for locally advanced rectal cancer

  19. Preoperative chemoradiation for locally advanced rectal cancer: comparison of three radiation dose and fractionation schedules

    Energy Technology Data Exchange (ETDEWEB)

    Park, Shin Hyung; Kim, Jae Chul [Dept. of Radiation Oncology, Kyungpook National University School of Medicine, Daegu (Korea, Republic of)

    2016-06-15

    The standard radiation dose for patients with locally rectal cancer treated with preoperative chemoradiotherapy is 45–50 Gy in 25–28 fractions. We aimed to assess whether a difference exists within this dose fractionation range. A retrospective analysis was performed to compare three dose fractionation schedules. Patients received 50 Gy in 25 fractions (group A), 50.4 Gy in 28 fractions (group B), or 45 Gy in 25 fractions (group C) to the whole pelvis, as well as concurrent 5-fluorouracil. Radical resection was scheduled for 8 weeks after concurrent chemoradiotherapy. Between September 2010 and August 2013, 175 patients were treated with preoperative chemoradiotherapy at our institution. Among those patients, 154 were eligible for analysis (55, 50, and 49 patients in groups A, B, and C, respectively). After the median follow-up period of 29 months (range, 5 to 48 months), no differences were found between the 3 groups regarding pathologic complete remission rate, tumor regression grade, treatment-related toxicity, 2-year locoregional recurrence-free survival, distant metastasis-free survival, disease-free survival, or overall survival. The circumferential resection margin width was a prognostic factor for 2-year locoregional recurrence-free survival, whereas ypN category was associated with distant metastasis-free survival, disease-free survival, and overall survival. High tumor regression grading score was correlated with 2-year distant metastasis-free survival and disease-free survival in univariate analysis. Three different radiation dose fractionation schedules, within the dose range recommended by the National Comprehensive Cancer Network, had no impact on pathologic tumor regression and early clinical outcome for locally advanced rectal cancer.

  20. Results of induction chemotherapy followed by three-dimensional conformal radiotherapy and concurrent weekly paclitaxel for stage III non-small cell lung cancer

    International Nuclear Information System (INIS)

    Wang Weihua; Bao Yong; Chen Ming; Zhang Li; Xu Guangchuan; Li Kaixin

    2008-01-01

    Objective: To evaluate the toxicity and efficacy of induction chemotherapy (ICT) followed by three-dimensional conformal radiotherapy (3DCRT) plus concurrent weekly paclitaxel for inoperable non-small cell lung cancer (NSCLC). Methods: Patients with stage III NSCLC in favorable conditions were treated with 2 to 4 cycles of carboplatin (AUC=5-6, d1) combined with paclitaxel (175 mg/m 2 , d1), then followed by weekly paclitaxel (40 mg/m 2 ) and concurrent 3DCRT within 34 weeks. The prescription dose of radiotherapy was given as high as possible while total lung V 20 ≤31% and total dose of the spinal cord ≤50 Gy. Results: ICT was well tolerated. During the concurrent chemoradiotherapy,the treatment of 4 patients was ended ahead of the schedule because of severe pulmonary and cardiac toxicities; the treatment of 2 patients was delayed for 7 and 12 days because of fatigue. Leucopenia(33/56) was in grade 1-2 except 1 patient in grade 3. Lymphocytopenia was severe (54/56,42 in grade 3). Three patients developed grade 3 acute radiation-induced esophagitis, and 3 developed grade 3-4 radiation-induced pneumonitis. There was one patients each who developed grade 2,3, and 4 late esophageal damage, respectively. Nine developed grade 2 pulmonary fibrosis. The overall response rate was 69.7%. The 1-year overall survival rate was 72.3%. The 1-year local progression-free survival rate was 62.7%. Conclusions: The schedule of ICT followed by weekly paclitaxel and concurrent 3DCRT can be well tolerated by most of the favorable patients with stage III NSCLC, and the toxicity is tolerable. Results of this study are encouraging, though long-term results should be followed up. (authors)

  1. Weekly scheduling of cisplatin: feasibility, efficacy and perspective

    NARCIS (Netherlands)

    A.S.Th. Planting (André)

    1996-01-01

    textabstractIn this thesis studies of weekly administration of cisplatin are presented. Weekly administration of cisplatin is not new: already in the seventies weekly cisplatin regimens were explored but they were abandoned because of hematologic, renal and gastrointestinal toxicity. The

  2. The scheduling of repeat cesarean section operations: prospective management protocol experience.

    Science.gov (United States)

    Read, J A

    1985-03-01

    There are benefits to patients and a busy obstetric service if repeat cesarean section operations are performed on a scheduled basis. Optimum management avoids prematurity and reduces the need for amniocentesis. Over a period of 20 months repeat cesarean sections were performed at Tripler Army Medical Center while a protocol with the following elements was used: (1) known last menstrual period; (2) landmarks: positive urine human chorionic gonadotropin test by 6 weeks, Doppler fetal heart tone by 12 weeks, date determination by examination before 10 weeks, fetoscope fetal heart tone by 20 weeks, and date determination by size before 30 weeks; (3) date determination by midtrimester sonogram(s); (4) normal third-trimester glucose screening; (5) biparietal diameter of 9.2 or 9.5 cm before scheduling. With two or more clinical landmarks and one date by sonogram or one landmark and date by two sonograms, elective repeat cesarean section was scheduled at 39 weeks if the biparietal diameter was greater than or equal to 9.2 cm (127). If dates by sonogram were less than dates by last menstrual period but greater than 1 week or if last menstrual period was unknown, dates by sonogram and landmarks corresponding to dates by sonogram were used to electively schedule, with biparietal diameters of 9.2 or 9.5 cm respectively required (28). If protocol criteria were not met or earlier delivery was indicated (e.g., vertical scar or diabetes), amniocentesis was performed (42), except when not possible, advisable, or refused when patients either elected labor (20) or were scheduled if three or more criteria for 40+ weeks were met (18). Of 225 patients (70.5%) scheduled by protocol (173), amniocentesis (34), or medical indication (18), 188 (58.9%) were delivered without labor. In the 147 patients (46.1%) delivered electively by protocol without labor or amniocentesis, there were no cases of respiratory distress syndrome and the mean birth weight was 3517 gm. With early care and better

  3. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  4. An Experimental Study of Scheduling and Duration of "Tier 2" First-Grade Reading Intervention

    Science.gov (United States)

    Denton, Carolyn A.; Cirino, Paul T.; Barth, Amy E.; Romain, Melissa; Vaughn, Sharon; Wexler, Jade; Francis, David J.; Fletcher, Jack M.

    2011-01-01

    This study compared the effects on reading outcomes of delivering supplemental, small-group intervention to first-grade students at risk for reading difficulties randomly assigned to one of three different treatment schedules: extended (4 sessions per week, 16 weeks; n = 66), concentrated (4 sessions per week, 8 weeks; n = 64), or distributed (2…

  5. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  6. Evaluation of interactive computerized training to teach parents to implement photographic activity schedules with children with autism spectrum disorder.

    Science.gov (United States)

    Gerencser, Kristina R; Higbee, Thomas S; Akers, Jessica S; Contreras, Bethany P

    2017-07-01

    Training parents of children with autism spectrum disorder can be a challenge due to limited resources, time, and money. Interactive computerized training (ICT)-a self-paced program that incorporates instructions, videos, and interactive questions-is one method professionals can use to disseminate trainings to broader populations. This study extends previous research on ICT by assessing the effect of ICT to teach three parents how to implement a photographic activity schedule using a systematic prompting procedure with their child. Following ICT, all parents increased their fidelity to implementation of an activity schedule during role-play sessions with an adult. Fidelity remained high during implementation with their child and maintained during a 2-week follow-up. © 2017 Society for the Experimental Analysis of Behavior.

  7. A comparison of twice-weekly MPD-PUVA and three times-weekly skin typing-PUVA regimens for the treatment of psoriasis

    Energy Technology Data Exchange (ETDEWEB)

    Buckley, D.A.; Rogers, S. [City of Dublin Skin and Cancer Hospital, Dublin (Ireland); Healy, E. [Royal Victoria Infirmary, Newcastle upon Tyne (United Kingdom)

    1995-09-01

    The most frequent PUVA treatment regimen in current use is three times weekly, using skin typing to estimate the starting dose. Recently, it was suggested that twice-weekly treatment, using the minimal phototoxic dose- (MPD) to calculate suberythmal starting doses of UVA, achieved similar clearance rates with fewer treatments and a lower cumulative UVA dose. We have carried out a trial on 83 patients, comparing twice-weekly MPD-PUVA with three times-weekly skin typing-PUVA, in order to test this hypothesis. Although clearance rates were comparable between the two regimens, there was no overall significant difference in the number of treatments or in the cumulative UVA doses at clearance. However, for patients with skin types I and II the cumulative UVA dose was significantly higher using the twice-weekly MPD regimen (70.OJ/cm{sup 2} vs. 55.8J/cm{sup 2}; P<0.05). Our results do not confirm that there is a reduction in cumulative UVA dosage with twice-weekly MPD-PUVA. (Author).

  8. Flexible Working and Couples' Coordination of Time Schedules

    OpenAIRE

    Bryan, Mark L.; Sevilla Sanz, Almudena

    2014-01-01

    Using previously unexploited data on time scheduling in the employment and household contexts, we investigate the effect of flexible working on couples' coordination of their daily work time schedules in the UK. We consider three distinct dimensions of flexible working: flexibility of daily start and finish times (flexitime), flexibility of work times over the year (annualised hours), and generalised control of working hours. We find that in couples with flexitime there is greater spouse sync...

  9. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  10. Day of the week lost time occupational injury trends in the US by gender and industry and their implications for work scheduling.

    Science.gov (United States)

    Brogmus, G E

    2007-03-01

    While there is a growing body of research on the impact of work schedules on the risk of occupational injuries, there has been little investigation into the impact that the day of the week might have. The present research was completed to explore day of the week trends, reasons for such trends and the corresponding implications for work scheduling. Data for the number of injuries and illnesses involving days away from work (lost time; LT) in 2004 were provided by the US Bureau of Labor Statistics Office of Safety and Health Statistics. Data from the American Time Use Survey database were used to estimate work hours in 2004. From these two data sources, the rate of LT injuries and illnesses (per 200 000 work hours) by day of the week, industry sector and gender were estimated. The analysis revealed clear differences by day of the week, gender and major industry sector. Sundays had the highest rate overall--nearly 37% higher than the average of the remaining days, Monday to Saturday. Mondays had the next highest rate followed closely by Saturdays. This pattern was not the same for males and females. For males, Mondays had the highest LT rate (27% higher than the average of all other days) with all remaining days having essentially the same rate. For females, Sundays and Saturdays had much higher LT rates--122% and 60% higher, respectively, than the average weekday rate. There were also differences by industry and differences between genders by industry. The present analysis suggests that several factors may be contributing to the weekend and Monday trends observed. Lower-tenured (and younger) workers on the weekends, lower female management/supervision and second jobs on the weekend seem to be contributors to the high Saturday and Sunday LT rates. Differences in day of the week employment by industry did not account for the trends observed. Fraud and overtime also could not be confirmed as contributing to these trends. Monday trends were more complex to explain, with

  11. Safety of a 3-weekly schedule of carboplatin plus pegylated liposomal doxorubicin as first line chemotherapy in patients with ovarian cancer: preliminary results of the MITO-2 randomized trial

    International Nuclear Information System (INIS)

    Pignata, Sandro; Del Gaizo, Filomena; Naglieri, Emanuele; Ferro, Antonella; Musso, Pietro; D'Arco, Alfonso Maria; Sorio, Roberto; Pisano, Carmela; Di Maio, Massimo; Signoriello, Giuseppe; Annunziata, Annalisa; Scambia, Giovanni; Perrone, Francesco; Savarese, Antonella; Breda, Enrico; Scollo, Paolo; De Vivo, Rocco; Rossi, Emanuela; Gebbia, Vittorio; Natale, Donato

    2006-01-01

    The MITO-2 (Multicentre Italian Trials in Ovarian cancer) study is a randomized phase III trial comparing carboplatin plus paclitaxel to carboplatin plus pegylated liposomal doxorubicin in first-line chemotherapy of patients with ovarian cancer. Due to the paucity of published phase I data on the 3-weekly experimental schedule used, an early safety analysis was planned. Patients with ovarian cancer (stage Ic-IV), aged < 75 years, ECOG performance status ≤ 2, were randomized to carboplatin AUC 5 plus paclitaxel 175 mg/m 2 , every 3 weeks or to carboplatin AUC 5 plus pegylated liposomal doxorubicin 30 mg/m 2 , every 3 weeks. Treatment was planned for 6 cycles. Toxicity was coded according to the NCI-CTC version 2.0. The pre-planned safety analysis was performed in July 2004. Data from the first 50 patients treated with carboplatin plus pegylated liposomal doxorubicin were evaluated. Median age was 60 years (range 34–75). Forty-three patients (86%) completed 6 cycles. Two thirds of the patients had at least one cycle delayed due to toxicity, but 63% of the cycles were administered on time. In most cases the reason for chemotherapy delay was neutropenia or other hematological toxicity. No delay due to palmar-plantar erythrodysesthesia (PPE) was recorded. No toxic death was recorded. Reported hematological toxicities were: grade (G) 3 anemia 16%, G3/G4 neutropenia 36% and 10% respectively, G3/4 thrombocytopenia 22% and 4% respectively. Non-haematological toxicity was infrequent: pulmonary G1 6%, heart rhythm G1 4%, liver toxicity G1 6%, G2 4% and G3 2%. Complete hair loss was reported in 6% of patients, and G1 neuropathy in 2%. PPE was recorded in 14% of the cases (G1 10%, G2 2%, G3 2%). This safety analysis shows that the adopted schedule of carboplatin plus pegylated liposomal doxorubicin given every 3 weeks is feasible as first line treatment in ovarian cancer patients, although 37% of the cycles were delayed due to haematological toxicity. Toxicities that are

  12. Safety of a 3-weekly schedule of carboplatin plus pegylated liposomal doxorubicin as first line chemotherapy in patients with ovarian cancer: preliminary results of the MITO-2 randomized trial

    Directory of Open Access Journals (Sweden)

    D'Arco Alfonso

    2006-08-01

    Full Text Available Abstract Background The MITO-2 (Multicentre Italian Trials in Ovarian cancer study is a randomized phase III trial comparing carboplatin plus paclitaxel to carboplatin plus pegylated liposomal doxorubicin in first-line chemotherapy of patients with ovarian cancer. Due to the paucity of published phase I data on the 3-weekly experimental schedule used, an early safety analysis was planned. Methods Patients with ovarian cancer (stage Ic-IV, aged 2, every 3 weeks or to carboplatin AUC 5 plus pegylated liposomal doxorubicin 30 mg/m2, every 3 weeks. Treatment was planned for 6 cycles. Toxicity was coded according to the NCI-CTC version 2.0. Results The pre-planned safety analysis was performed in July 2004. Data from the first 50 patients treated with carboplatin plus pegylated liposomal doxorubicin were evaluated. Median age was 60 years (range 34–75. Forty-three patients (86% completed 6 cycles. Two thirds of the patients had at least one cycle delayed due to toxicity, but 63% of the cycles were administered on time. In most cases the reason for chemotherapy delay was neutropenia or other hematological toxicity. No delay due to palmar-plantar erythrodysesthesia (PPE was recorded. No toxic death was recorded. Reported hematological toxicities were: grade (G 3 anemia 16%, G3/G4 neutropenia 36% and 10% respectively, G3/4 thrombocytopenia 22% and 4% respectively. Non-haematological toxicity was infrequent: pulmonary G1 6%, heart rhythm G1 4%, liver toxicity G1 6%, G2 4% and G3 2%. Complete hair loss was reported in 6% of patients, and G1 neuropathy in 2%. PPE was recorded in 14% of the cases (G1 10%, G2 2%, G3 2%. Conclusion This safety analysis shows that the adopted schedule of carboplatin plus pegylated liposomal doxorubicin given every 3 weeks is feasible as first line treatment in ovarian cancer patients, although 37% of the cycles were delayed due to haematological toxicity. Toxicities that are common with standard combination of carboplatin

  13. Recommended Immunization Schedules for Persons Aged 0 through 18 Years--United States, 2010. Morbidity and Mortality Weekly Report QuickGuide. Volume 58, Number 51 & 52

    Science.gov (United States)

    Centers for Disease Control and Prevention, 2010

    2010-01-01

    The Advisory Committee on Immunization Practices (ACIP) annually publishes an immunization schedule for persons aged 0 through 18 years that summarizes recommendations for currently licensed vaccines for children aged 18 years and younger and includes recommendations in effect as of December 15, 2009. The changes to the previous schedule are…

  14. Survival with Three-Times Weekly In-Center Nocturnal Versus Conventional Hemodialysis

    Science.gov (United States)

    Xu, Jianglin; Suri, Rita S.; Nesrallah, Gihad; Lindsay, Robert; Garg, Amit X.; Lester, Keith; Ofsthun, Norma; Lazarus, Michael; Hakim, Raymond M.

    2012-01-01

    Whether the duration of hemodialysis treatments improves outcomes remains controversial. Here, we evaluated survival and clinical changes associated with converting from conventional hemodialysis (mean=3.75 h/treatment) to in-center nocturnal hemodialysis (mean=7.85 h/treatment). All 959 consecutive patients who initiated nocturnal hemodialysis for the first time in 77 Fresenius Medical Care facilities during 2006 and 2007 were eligible. We used Cox models to compare risk for mortality during 2 years of follow-up in a 1:3 propensity score–matched cohort of 746 nocturnal and 2062 control patients on conventional hemodialysis. Two-year mortality was 19% among nocturnal hemodialysis patients compared with 27% among conventional patients. Nocturnal hemodialysis associated with a 25% reduction in the risk for death after adjustment for age, body mass index, and dialysis vintage (hazard ratio=0.75, 95% confidence interval=0.61–0.91, P=0.004). With respect to clinical features, interdialytic weight gain, albumin, hemoglobin, dialysis dose, and calcium increased on nocturnal therapy, whereas postdialysis weight, predialysis systolic blood pressure, ultrafiltration rate, phosphorus, and white blood cell count declined (all P<0.001). In summary, notwithstanding the possibility of residual selection bias, conversion to treatment with nocturnal hemodialysis associates with favorable clinical features, laboratory biomarkers, and improved survival compared with propensity score–matched controls. The potential impact of extended treatment time on clinical outcomes while maintaining a three times per week hemodialysis schedule requires evaluation in future clinical trials. PMID:22362905

  15. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  16. Short-term hydro generation scheduling of Three Gorges–Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach

    International Nuclear Information System (INIS)

    Mo, Li; Lu, Peng; Wang, Chao; Zhou, Jianzhong

    2013-01-01

    Highlights: • MACS and ADE algorithms are hybridized as MACS-ADE method for solving STHGS problem. • An adaptive mutation is integrated into the proposed algorithm to avoid premature convergence. • MACS and ADE are run in parallel in search of better solution. • Several effective heuristic strategies are designed for dealing with various constraints of STHGS problem. - Abstract: Short-term hydro generation scheduling (STHGS) aims at determining optimal hydro generation scheduling to obtain minimum water consumption for one day or week while meeting various system constraints. In this paper, the STHGS problem is decomposed into two sub-problems: (i) unit commitment (UC) sub-problem; (ii) economic load dispatch (ELD) sub-problem. Then, we present a hybrid algorithm based on multi ant colony system (MACS) and differential evolution (DE) for solving the STHGS problem. First, MACS is used for dealing with UC sub-problem. A set of cooperating ant colonies cooperate to choose the unit state over the scheduled time horizon. Then, the adaptive differential evolution (ADE) is used to solve ELD sub-problem. MACS and ADE are run in parallel with adjusting their solutions in search of a better solution. Meanwhile, local and global pheromone updating rules in MACS and adaptive dynamic parameter adjusting strategy in DE are applied for enhancing the search ability of MACS-ADE. Finally, the proposed method is implemented to solve STHGS problem of Three Gorges–Gezhouba cascaded hydropower plants to verify the feasibility and effectiveness. Compared with other established methods, the simulation results reveal that the proposed MACS-ADE approach has the best convergence property, computational efficiency with less water consumption

  17. Occupancy schedules for energy simulation in new prEN16798-1 and ISO/FDIS 17772-1 standards

    DEFF Research Database (Denmark)

    Ahmed, Kaiser; Akhondzada, Ali; Kurnitski, Jarek

    2017-01-01

    This study reports the development of occupancy, lighting and appliance hourly schedules for new energy calculation input data standards. Developed schedules apply for 10 building categories which are described by one to three space categories, and include the separation between weekdays and week......This study reports the development of occupancy, lighting and appliance hourly schedules for new energy calculation input data standards. Developed schedules apply for 10 building categories which are described by one to three space categories, and include the separation between weekdays......-1 standards, supported by appliances and lighting schedules which are similarly needed as energy calculation input data. Hourly schedules allow to model occupant behaviour effects, for instance the peak cooling load in an office room was increased by factor of 1.1–1.3 compared to the use of constant average...

  18. The role of abnormal fetal heart rate in scheduling chorionic villus sampling.

    Science.gov (United States)

    Yagel, S; Anteby, E; Ron, M; Hochner-Celnikier, D; Achiron, R

    1992-09-01

    To assess the value of fetal heart rate (FHR) measurements in predicting spontaneous fetal loss in pregnancies scheduled for chorionic villus sampling (CVS). A prospective descriptive study. Two hospital departments of obstetrics and gynaecology in Israel. 114 women between 9 and 11 weeks gestation scheduled for chorionic villus sampling (CVS). Fetal heart rate was measured by transvaginal Doppler ultrasound and compared with a monogram established from 75 fetuses. Whenever a normal FHR was recorded, CVS was performed immediately. 106 women had a normal FHR and underwent CVS; two of these pregnancies ended in miscarriage. In five pregnancies no fetal heart beats could be identified and fetal death was diagnosed. In three pregnancies an abnormal FHR was recorded and CVS was postponed; all three pregnancies ended in miscarriage within 2 weeks. Determination of FHR correlated with crown-rump length could be useful in predicting spontaneous miscarriage before performing any invasive procedure late in the first trimester.

  19. Influence of titration schedule and maintenance dose on the tolerability of adjunctive eslicarbazepine acetate: An integrated analysis of three randomized placebo-controlled trials.

    Science.gov (United States)

    Krauss, Gregory; Biton, Victor; Harvey, Jay H; Elger, Christian; Trinka, Eugen; Soares da Silva, Patrício; Gama, Helena; Cheng, Hailong; Grinnell, Todd; Blum, David

    2018-01-01

    To examine the influence of titration schedule and maintenance dose on the incidence and type of treatment-emergent adverse events (TEAEs) associated with adjunctive eslicarbazepine acetate (ESL). Data from three randomized, double-blind, placebo-controlled trials were analyzed. Patients with refractory partial-onset seizures were randomized to maintenance doses of ESL 400, 800, or 1200mg QD (dosing was initiated at 400 or 800mg QD) or placebo. The incidence of TEAEs was analyzed during the double-blind period (2-week titration phase; 12-week maintenance phase), according to the randomized maintenance dose and the titration schedule. 1447 patients were included in the analysis. During the first week of treatment, 62% of patients taking ESL 800mg QD had ≥1 TEAE, vs 35% of those taking 400mg QD and 32% of the placebo group; dizziness, somnolence, nausea, and headache were numerically more frequent in patients taking ESL 800mg than those taking ESL 400mg QD. During the double-blind period, the incidences of common TEAEs were lower in patients who initiated ESL at 400mg vs 800mg QD. For the 800 and 1200mg QD maintenance doses, rates of TEAEs leading to discontinuation were lower in patients who began treatment with 400mg than in those who began taking ESL 800mg QD. Initiation of ESL at 800mg QD is feasible. However, initiating treatment with ESL 400mg QD for 1 or 2 weeks is recommended, being associated with a lower incidence of TEAEs, and related discontinuations. For some patients, treatment may be initiated at 800mg QD, if the need for more immediate seizure reduction outweighs concerns about increased risk of adverse reactions during initiation. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  20. Further Examination of the Reliability of the Modified Rathus Assertiveness Schedule.

    Science.gov (United States)

    Del Greco, Linda; And Others

    1986-01-01

    Examined the reliability of the 30-item Modified Rathus Assertiveness Schedule (MRAS) using the test-retest method over a three-week period. The MRAS yielded correlations of .74 using the Pearson product and Spearman Brown correlation coefficient. Correlations for males yielded .77 and .72. For females correlations for both tests were .72.…

  1. Agreement reached at Unilever after three-week strike over plant closures

    NARCIS (Netherlands)

    Grünell, M.

    2008-01-01

    In mid October 2007, staff at the Unilever plant in the Netherlands went on strike for over three weeks in protest against the group’s plan to close three of the country’s six Unilever plants. The trade unions believe that the closures are unnecessary and are calling for job guarantees for employees

  2. A three-week traditional altitude training increases hemoglobin mass and red cell volume in elite biathlon athletes.

    Science.gov (United States)

    Heinicke, K; Heinicke, I; Schmidt, W; Wolfarth, B

    2005-06-01

    It is well known that altitude training stimulates erythropoiesis, but only few data are available concerning the direct altitude effect on red blood cell volume (RCV) in world class endurance athletes during exposure to continued hypoxia. The purpose of this study was to evaluate the impact of three weeks of traditional altitude training at 2050 m on total hemoglobin mass (tHb), RCV and erythropoietic activity in highly-trained endurance athletes. Total hemoglobin mass, RCV, plasma volume (PV), and blood volume (BV) from 6 males and 4 females, all members of a world class biathlon team, were determined on days 1 and 20 during their stay at altitude as well as 16 days after returning to sea-level conditions (800 m, only males) by using the CO-rebreathing method. In males tHb (14.0 +/- 0.2 to 15.3 +/- 1.0 g/kg, p altitude and returned to near sea-level values 16 days after descent. Similarly in females, tHb (13.0 +/- 1.0 to 14.2 +/- 1.3 g/kg, p altitude training period, whereas PV was not altered. In male athletes, plasma erythropoietin concentration increased up to day 4 at altitude (11.8 +/- 5.0 to 20.8 +/- 6.0 mU/ml, p altitude training period, both parameters indicating enhanced erythropoietic activity. In conclusion, we show for the first time that a three-week traditional altitude training increases erythropoietic activity even in world class endurance athletes leading to elevated tHb and RCV. Considering the relatively fast return of tHb and RCV to sea-level values after hypoxic exposure, our data suggest to precisely schedule training at altitude and competition at sea level.

  3. Comparing three scheduling methods using BIM models in the Last Planner System

    Directory of Open Access Journals (Sweden)

    Brioso Xavier

    2017-12-01

    Full Text Available This article presents strategies for teaching scheduling methods such as takt-time, flowlines, and point-to-point precedence relations (PTPPRs using build­ing information modeling (BIM models in the Last Planner System. This article is the extended version of the article entitled “Teaching Takt-Time, Flowline and Point-to-point Precedence Relations: A Peruvian Case Study,” which has been published in Procedia Engineering (Vol. 196, 2017, pages 666-673. A case study is conducted in final year students of civil engineering at the Pontifical Catholic University of Peru. The mock-up project is an educational building that has high repetitive processes in the struc­tural works phase. First, traditional tools such as Excel spreadsheets and 2D drawings were used to teach produc­tion system design with takt-time, flowlines, and PTPPR. Second, 3D and 4D models with Revit 2016 and Navis­works 2016 were used to integrate the previous schedules with a BIM model and to identify its strengths and weak­nesses. Finally, Vico Office was used for the automation of schedules and comparison of the methods in 4D and 5D. This article describes the lectures, workshops, and simu­lations employed, as well as the feedback from students and researchers. The success of the teaching strategy is reflected in the survey responses from students and the final perceptions of the construction management tools presented.

  4. Timing of elective repeated cesarean delivery in patients with previous two or more cesarean section.

    Science.gov (United States)

    Mohammed, Abdel-Baset F; Bayo, Arabo I; Abu-Jubara, Mahmoud F

    2013-01-01

    To assess the maternal and neonatal consequences of scheduling elective repeated cesarean section (ERCS) at 39 weeks rather than 38 weeks and to assess the impacts of delivering by emergency cesarean section (CS) before the planned date. Retrospective Cohort study. Patients with previous two or more CS planned for ERCS at term during the period from January to June 2011. Medical records were reviewed for demographic and clinical data, planned timing of CS, emergency cesarean and any adverse maternal or neonatal outcome. Adverse maternal or neonatal outcome. Four hundred and twenty women were included, 71.4% of cases were posted <39 weeks and 28.6% were posted at ≥39 weeks. Patients posted ≥ 39 weeks were more prone to deliver by emergency CS (16.6 vs. 10.6%) and the neonates were less prone to RDS and NICU admission (p < 0.05). Our data support the justification to book patients for ERCS at ≥39 weeks.

  5. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  6. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  7. Spontaneous Fundal Uterine Rupture in a Pregnant Woman at 32 Weeks Gestation who had Two Previous Cesarean Sections

    Directory of Open Access Journals (Sweden)

    Metin Kaba

    2017-08-01

    Full Text Available Spontaneous uterine rupture during pregnancy can cause severe complications, even maternal and fetal demise. We report successful management of a spontaneous fundal uterine rupture in a 32 week pregnant who had undergone two previous cesarean sections due to preterm delivery. We explain causes of spontaneous uterine rupture and the management of this rare event in the presented case report.

  8. Increased neonatal morbidity despite pulmonary maturity for deliveries occurring before 39 weeks.

    Science.gov (United States)

    Fang, Yu Ming Victor; Guirguis, Peter; Borgida, Adam; Feldman, Deborah; Ingardia, Charles; Herson, Victor

    2013-01-01

    To compare neonatal outcomes following deliveries 39 weeks after confirmation of fetal lung maturity with scheduled deliveries ≥39 weeks. A retrospective cohort study examining neonatal outcomes of women who were delivered following documented fetal pulmonary maturity at 36, 37, and 38 weeks compared to women undergoing a scheduled delivery at 39, 40, and 41 weeks. The χ(2)-test and Student's t-test were used to compare categorical and continuous data, respectively. Delivery prior to 39 weeks following fetal pulmonary maturity was associated with a 8.4% composite neonatal morbidity rate as compared to 3.3% for deliveries at 39 weeks or greater (relative risk [RR] 2.9; confidence interval [CI] 2.4-3.6). Neonatal respiratory morbidity was significantly higher (5.4%) for those delivering at less than 39 weeks with documented fetal pulmonary maturity as compared to 2.1% for those delivering at 39 weeks or greater (RR 3.0; CI 2.3-3.9). Increased neonatal morbidity persisted for those delivered prior to 39 weeks even after excluding all diabetics (p 39 weeks regardless of the mode of delivery. Despite fetal pulmonary maturity, delivery before 39 weeks is associated with significantly increased neonatal morbidity when compared to scheduled deliveries at 39 weeks or greater.

  9. Outcomes with two different schedules of bortezomib, melphalan, and prednisone (VMP) for previously untreated multiple myeloma: matched pair analysis using long-term follow-up data from the phase 3 VISTA and PETHEMA/GEM05 trials.

    Science.gov (United States)

    Mateos, Maria-Victoria; Oriol, Albert; Martínez-López, Joaquín; Teruel, Ana-Isabel; Bengoechea, Enrique; Palomera, Luis; de Arriba, Felipe; Esseltine, Dixie-Lee; Cakana, Andrew; Pei, Lixia; van de Velde, Helgi; Miguel, Jesus San

    2016-12-01

    Bortezomib-melphalan-prednisone (VMP) is a standard-of-care for previously untreated, transplant-ineligible multiple myeloma (MM). Here, we compared outcomes between VMP regimens in the VISTA trial (9-cycle VMP schedule, including 4 cycles of twice weekly bortezomib) and the PETHEMA/GEM05 trial (less intensive 6-cycle VMP schedule with 1 cycle of twice weekly and 5 cycles of weekly bortezomib, then bortezomib-based maintenance). A total of 113 patient pairs matched by propensity score (estimated using logistic regression and incorporating eight exposure/outcome-related parameters) were included in this retrospective analysis. Median cumulative bortezomib dose was higher in PETHEMA/GEM05 than VISTA (49.6 vs 37.0 mg/m 2 ); median dose intensity was lower (2.0 vs 5.1 mg/m 2 /month). Median progression-free survival (PFS) and time-to-progression (TTP) were significantly longer in PETHEMA/GEM05 than VISTA (PFS, 30.5 vs 20.0 months, p = 0.0265; TTP, 33.8 vs 24.2 months, p = 0.0049) after a median follow-up of 77.2 and 26.0 months, respectively. Median overall survival (OS) was similar (61.3 vs 61.0 months, p = 0.6528; median follow-up, 77.6 vs 60.1 months). Post-induction complete response rate was lower in PETHEMA/GEM05 than VISTA (19 vs 31 %; p = 0.03318); on-study (including maintenance) rate was similar (30 vs 31 %; p = 0.89437). This analysis suggests that the less-intensive PETHEMA/GEM05 VMP regimen plus maintenance may improve PFS and TTP, but not OS, compared with the VISTA VMP regimen. NCT00111319, NCT00443235.

  10. Dichorionic twin ultrasound surveillance: sonography every 4 weeks significantly underperforms sonography every 2 weeks: results of the Prospective Multicenter ESPRiT Study.

    Science.gov (United States)

    Corcoran, Siobhan; Breathnach, Fionnuala; Burke, Gerard; McAuliffe, Fionnuala; Geary, Michael; Daly, Sean; Higgins, John; Hunter, Alyson; Morrison, John J; Higgins, Shane; Mahony, Rhona; Dicker, Patrick; Tully, Elizabeth; Malone, Fergal D

    2015-10-01

    A 2-week ultrasound scanning schedule for monochorionic twins is endorsed widely. There is a lack of robust data to inform a schedule for the surveillance of dichorionic gestations. We aimed to determine how ultrasound scanning that is performed at 2- or 4-week intervals (or every 4 weeks before 32 weeks' gestation and every 2 weeks thereafter) may impact the prenatal detection of fetal growth restriction (FGR) and ultimately influence timing of delivery. In a consecutive cohort of 789 dichorionic twin pregnancies that were recruited prospectively for the multicenter Evaluation of Sonographic Predictors of Restricted Growth in Twins study, ultrasound determination of fetal growth and interrogation of umbilical and middle cerebral artery Doppler scans were performed every 2 weeks from 24 weeks' gestation until delivery. Complete delivery and perinatal outcome data were recorded for all pregnancies. Where delivery was prompted by FGR, abnormal umbilical artery Doppler examination or poor biophysical profile and in the absence of ruptured membranes, onset of labor, preeclampsia, or antepartum hemorrhage, the delivery was considered "ultrasound-indicated." For ultrasound-indicated deliveries, detection probabilities for FGR/abnormal umbilical artery Doppler scans/poor biophysical were determined according to the interval between examinations, by the suppression if alternate examination data. Among 789 dichorionic twin pregnancies, 66 pairs (8%) had an "ultrasound indicated" delivery. Detection of FGR was reduced from 88-69%, and detection of abnormal umbilical artery Doppler was reduced from 82-62% when a 4-week ultrasound schedule was simulated. Both of these reductions reached statistical significance. There was a nonsignificant trend toward a reduction in the recording of oligohydramnios with a 4-week interval between examinations. This study suggests that the ultrasound surveillance program of every 2 weeks that is recommended currently for monochorionic twins

  11. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  12. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  13. Phase I study of twice-weekly gemcitabine and concomitant external-beam radiotherapy in patients with adenocarcinoma of the pancreas

    International Nuclear Information System (INIS)

    Pipas, J. Marc; Mitchell, Sandra E.; Barth, Richard J.; Vera-Gimon, Raul; Rathmann, Joerg; Meyer, Louise P.; Wagman, Richard S.; Lewis, Lionel D.; McDonnell, Carol; Colacchio, Thomas A.; Perez, Raymond P.

    2001-01-01

    Purpose: To determine the maximum tolerated dose and dose-limiting toxicity associated with twice-weekly gemcitabine and concomitant external-beam radiotherapy in patients with adenocarcinoma of the pancreas. Methods and Materials: Twenty-one patients with biopsy-proven adenocarcinoma of the pancreas were treated with external-beam radiotherapy to a dose of 50.4 Gy in 28 fractions, concurrent with gemcitabine, infused over 30 min before irradiation on a Monday and Thursday schedule. The dose of gemcitabine was escalated in 5 cohorts of 3-6 patients each. Initial gemcitabine dose was 10 mg/m 2 , with dose escalation until dose-limiting toxicity was observed. Results: The maximum tolerated dose of gemcitabine was 50 mg/m 2 , when given in a twice-weekly schedule with radiation. Dose-limiting toxicity was seen in 2 patients at 60 mg/m 2 , and consisted of severe upper gastrointestinal bleeding approximately 1 month after completion of treatment. Six patients had radiographic evidence of response to treatment, and 5 of these underwent complete surgical resection. Three patients who underwent complete resection had been deemed to have unresectable tumors before enrollment on trial. Four patients are alive, including 2 without evidence of disease more than 1 year after resection. Conclusion: The combination of external-beam radiation and twice-weekly gemcitabine at a dose of 50 mg/m 2 is well tolerated and shows promising activity for the treatment of pancreatic cancer. Our data suggest a higher maximum tolerated dose and different dose-limiting toxicity than previously reported. Further investigation of this regimen is warranted

  14. Does Shortening the School Week Impact Student Performance? Evidence from the Four-Day School Week

    OpenAIRE

    D. Mark Anderson; Mary Beth Walker

    2015-01-01

    School districts use a variety of policies to close budget gaps and stave off teacher layoffs and furloughs. More schools are implementing four-day school weeks to reduce overhead and transportation costs. The four-day week requires substantial schedule changes as schools must increase the length of their school day to meet minimum instructional hour requirements. Although some schools have indicated this policy eases financial pressures, it is unknown whether there is an impact on student ou...

  15. Chemotherapy appointment scheduling under uncertainty using mean-risk stochastic integer programming.

    Science.gov (United States)

    Alvarado, Michelle; Ntaimo, Lewis

    2018-03-01

    Oncology clinics are often burdened with scheduling large volumes of cancer patients for chemotherapy treatments under limited resources such as the number of nurses and chairs. These cancer patients require a series of appointments over several weeks or months and the timing of these appointments is critical to the treatment's effectiveness. Additionally, the appointment duration, the acuity levels of each appointment, and the availability of clinic nurses are uncertain. The timing constraints, stochastic parameters, rising treatment costs, and increased demand of outpatient oncology clinic services motivate the need for efficient appointment schedules and clinic operations. In this paper, we develop three mean-risk stochastic integer programming (SIP) models, referred to as SIP-CHEMO, for the problem of scheduling individual chemotherapy patient appointments and resources. These mean-risk models are presented and an algorithm is devised to improve computational speed. Computational results were conducted using a simulation model and results indicate that the risk-averse SIP-CHEMO model with the expected excess mean-risk measure can decrease patient waiting times and nurse overtime when compared to deterministic scheduling algorithms by 42 % and 27 %, respectively.

  16. Physician satisfaction with a multi-platform digital scheduling system.

    Directory of Open Access Journals (Sweden)

    Rodrigo Octávio Deliberato

    Full Text Available Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation.Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after.51 (77% of the physicians answered the baseline survey. Of those, 32 (63% were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70% of the responders were using more than one method to carry out shift exchanges and only 20 (40% were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73% physicians. Forty-eight (98% of them found the mobile application easy or very easy to install and 47 (96% did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001. The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001.Our web and mobile phone-based scheduling system resulted in better physician satisfaction.

  17. Developing optimal nurses work schedule using integer programming

    Science.gov (United States)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  18. A multistate quality improvement program to decrease elective deliveries before 39 weeks of gestation.

    Science.gov (United States)

    Oshiro, Bryan T; Kowalewski, Leslie; Sappenfield, William; Alter, Caroline C; Bettegowda, Vani R; Russell, Rebecca; Curran, John; Reeves, Lori; Kacica, Marilyn; Andino, Nelson; Mason-Marti, Peyton; Crouse, Dennis; Knight, Susan; Littlejohn, Karen; Malatok, Sharyn; Dudley, Donald J; Berns, Scott D

    2013-05-01

    Nonmedically indicated (elective) deliveries before 39 weeks of gestation result in unnecessary neonatal morbidity. We sought to determine whether implementation of a process improvement program will decrease the rate of elective scheduled singleton early-term deliveries (37 0/7-38 6/7 weeks of gestation) in a group of diverse community and academic hospitals. Policies and procedures for scheduling inductions and cesarean deliveries were implemented and patient and health care provider education was provided. Outcomes for scheduled singleton deliveries at 34 weeks of gestation or higher were submitted through a web-based data entry system. The rate of scheduled singleton elective early-term deliveries as well as the rates of early-term medically indicated and unscheduled deliveries, neonatal intensive care unit admissions, and singleton term fetal mortality rate were evaluated. A total of 29,030 scheduled singletons at 34 weeks of gestation or higher were delivered in 26 participating hospitals between January 2011 and December 2011. Elective scheduled early-term deliveries decreased from 27.8% in the first month to 4.8% in the 12th month (Pscheduled singleton early-term inductions (72%, P=.029) and cesarean deliveries (84%; Pscheduled early-term singletons decreased nonsignificantly from 1.5% to 1.2% (P=.24). There was no increase in the term fetal mortality rate. A rapid-cycle process improvement program substantially decreased elective scheduled early-term deliveries to less than 5% in a group of diverse hospitals across multiple states. III.

  19. Short-term scheduling of an open-pit mine with multiple objectives

    Science.gov (United States)

    Blom, Michelle; Pearce, Adrian R.; Stuckey, Peter J.

    2017-05-01

    This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as 'blocks', to be extracted in each week of a planning horizon (typically spanning 13 weeks). Existing tools for constructing these schedules use greedy heuristics, with little optimization. To construct a single schedule in which infrastructure is sufficiently utilized, with production grades consistently close to a desired target, a planner must often run these heuristics many times, adjusting parameters after each iteration. A planner's intuition and experience can evaluate the relative quality and mineability of different schedules in a way that is difficult to automate. Of interest to a short-term planner is the generation of multiple schedules, extracting available ore and waste in varying sequences, which can then be manually compared. This article presents a tool in which multiple, diverse, short-term schedules are constructed, meeting a range of common objectives without the need for iterative parameter adjustment.

  20. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  1. Hepatic steatosis development with four weeks of physical inactivity in previously active, hyperphagic OLETF rats.

    Science.gov (United States)

    Linden, Melissa A; Meers, Grace M; Ruebel, Meghan L; Jenkins, Nathan T; Booth, Frank W; Laughlin, M Harold; Ibdah, Jamal A; Thyfault, John P; Rector, R Scott

    2013-05-01

    Physical activity-induced prevention of hepatic steatosis is maintained during short-term (7-day) transitions to an inactive state; however, whether these protective effects are present under a longer duration of physical inactivity is largely unknown. Here, we sought to determine whether previous physical activity had protective effects on hepatic steatosis and metabolic health following 4 wk of physical inactivity. Four-week old, hyperphagic, male Otsuka Long-Evans Tokushima fatty (OLETF) rats were randomly assigned to either a sedentary group for 16 wk (OLETF-SED), given access to running wheels for 16 wk with wheels locked 5 h (OLETF-WL5hr) or given access to running wheels for 12 wk with wheels locked 4 wk (OLETF-WL4wk) prior to death. Four weeks of physical inactivity caused hepatic steatosis development, but liver triglycerides remained 60% lower than OLETF-SED (P inactivity, whereas markers of fatty acid uptake and lipogenesis remained relatively suppressed following 4 wk of inactivity. In addition, 4 wk of inactivity caused a complete loss of activity-induced increases in serum IL-6 and reductions in regulated upon activation, normal T-cell expressed, and secreted (RANTES), and a partial loss in reductions in leptin, monocyte chemoattractant protein-1, and TNF-α. In conclusion, 4 wk of physical inactivity does not result in a complete loss in physical activity-induced benefits but does cause deterioration in the liver phenotype and overall metabolic health in hyperphagic OLETF rats.

  2. Phase II study of a 3-day schedule with topotecan and cisplatin in patients with previously untreated small cell lung cancer and extensive disease

    DEFF Research Database (Denmark)

    Sorensen, M.; Lassen, Ulrik Niels; Jensen, Peter Buhl

    2008-01-01

    INTRODUCTION: Treatment with a topoisomerase I inhibitor in combination with a platinum results in superior or equal survival compared with etoposide-based treatment in extensive disease small cell lung cancer (SCLC). Five-day topotecan is inconvenient and therefore shorter schedules of topotecan...... and cisplatin are needed. The aim of this phase II study was to establish the response rate and response duration in chemo-naive patients with SCLC receiving a 3-day topotecan and cisplatin schedule. METHODS: Simons optimal two-stage design was used. Patients with previously untreated extensive disease SCLC...... age was 59 (range 44-74), 79% had performance status 0 or 1. Thirty-one patients completed all six cycles. Grade 3/4 anemia, neutrocytopenia, and thrombocytopenia were recorded in 9.5%, 66.7%, and 21.4% of patients, respectively. Fourteen percent of patients experienced neutropenic fever. No episodes...

  3. The Four Day Week: An Alternative School Calendar.

    Science.gov (United States)

    Pope, Jean; Gillian, Russ

    This booklet surveys the possibilities in instituting a 4-day school week, an approach which has gained favor in some small school districts. The history of the 4-day week and its characteristics are first described. Drawing on case studies of districts that have begun the 4-day schedule, the authors enumerate the steps in proposing and…

  4. Relationship between shift work schedule and self-reported sleep quality in Chinese employees.

    Science.gov (United States)

    Ma, Yifei; Wei, Fu; Nie, Guanghui; Zhang, Li'e; Qin, Jian; Peng, Suwan; Xiong, Feng; Zhang, Zhiyong; Yang, Xiaobo; Peng, Xiaowu; Wang, Mingjun; Zou, Yunfeng

    2018-02-01

    Few studies have reported on the effects of fixed and rotating shift systems on the prevalence of sleep disturbance. Thus, in this study, the relationships between different work schedules and sleep disturbance in Chinese workers were investigated. A total of 2180 workers aged 19-65 years responded to the self-report questionnaire on shift work schedule (fixed day-shift, fixed night-shift, two-shift or three-shift system), working hours a day, and working days a week, physical effort, subjective sleep quality and subjective mental state. It was found that the rotating shift workers, namely, two- and three-shift workers, exhibited higher risks of sleep disturbance than with the fixed day-shift workers did (OR 1.37; 95% CI 1.07to 1.74; and OR 2.19; 95% CI 1.52 to 3.15, respectively). The risk was particularly high among two- or three-shift workers who worked more than 8 hours a day or more than 5 days a week and among three-shift workers who reported both light and heavy physical effort at work. Moreover, the two- and three-shift workers (rotating shift workers) suffered from poorer sleep quality than the fixed night shift workers did (OR 1.84; 95% CI 1.01 to 3.32; and OR 2.94; 95% CI 1.53 to 5.64, respectively). Consequently, rotating shift work (two- and three-shift work) is a risk factor for sleep disturbance, and the fixed work rhythm may contribute to the quality of sleep.

  5. The applicability of knowledge-based scheduling to the utilities industry

    International Nuclear Information System (INIS)

    Yoshimoto, G.; Gargan, R. Jr.; Duggan, P.

    1992-01-01

    The Electric Power Research Institute (EPRI), Nuclear Power Division, has identified the three major goals of high technology applications for nuclear power plants. These goals are to enhance power production through increasing power generation efficiency, to increase productivity of the operations, and to reduce the threats to the safety of the plant. Our project responds to the second goal by demonstrating that significant productivity increases can be achieved for outage maintenance operations based on existing knowledge-based scheduling technology. Its use can also mitigate threats to potential safety problems by means of the integration of risk assessment features into the scheduler. The scheduling approach uses advanced techniques enabling the automation of the routine scheduling decision process that previously was handled by people. The process of removing conflicts in scheduling is automated. This is achieved by providing activity representations that allow schedulers to express a variety of different scheduling constraints and by implementing scheduling mechanisms that simulate kinds of processes that humans use to find better solutions from a large number of possible solutions. This approach allows schedulers to express detailed constraints between activities and other activities, resources (material and personnel), and requirements that certain states exist for their execution. Our scheduler has already demonstrated its benefit to improving the shuttle processing flow management at Kennedy Space Center. Knowledge-based scheduling techniques should be examined by utilities industry researchers, developers, operators and management for application to utilities planning problems because of its great cost benefit potential. 4 refs., 4 figs

  6. Three hybridization models based on local search scheme for job shop scheduling problem

    Science.gov (United States)

    Balbi Fraga, Tatiana

    2015-05-01

    This work presents three different hybridization models based on the general schema of Local Search Heuristics, named Hybrid Successive Application, Hybrid Neighborhood, and Hybrid Improved Neighborhood. Despite similar approaches might have already been presented in the literature in other contexts, in this work these models are applied to analyzes the solution of the job shop scheduling problem, with the heuristics Taboo Search and Particle Swarm Optimization. Besides, we investigate some aspects that must be considered in order to achieve better solutions than those obtained by the original heuristics. The results demonstrate that the algorithms derived from these three hybrid models are more robust than the original algorithms and able to get better results than those found by the single Taboo Search.

  7. Long-term clinical parameters after switching to nocturnal haemodialysis : a Dutch propensity-score-matched cohort study comparing patients on nocturnal haemodialysis with patients on three-times-a-week haemodialysis/haemodiafiltration

    NARCIS (Netherlands)

    Jansz, Thijs Thomas; Özyilmaz, Akin; Grooteman, Muriel P C; Hoekstra, Tiny; Romijn, Marieke; Blankestijn, Peter J; Bots, Michael L; van Jaarsveld, Brigit C

    2018-01-01

    OBJECTIVES: Nocturnal haemodialysis (NHD), characterised by 8-hour sessions ≥3 times a week, is known to improve clinical parameters in the short term compared with conventional-schedule haemodialysis (HD), generally 3×3.5-4 hours a week. We studied long-term effects of NHD and used patients on

  8. LHC 2012 proton run extended by seven weeks

    CERN Multimedia

    James Gillies

    2012-01-01

    An important piece of news that almost got lost in the excitement of the Higgs update seminar on 4 July is that the 2012 LHC proton run is to be extended.   On 3 July, a meeting was held between the CERN Management and representatives of the LHC and the experiments to discuss the merits of increasing the data target for this year in the light of the announcement to be made the following day. The conclusion was that an additional seven weeks of running would allow the luminosity goal for the year to be increased from 15 inverse femtobarns to 20, giving the experiments a good supply of data to work on during the LHC’s first long shut-down (LS1), and allowing them to make progress in determining the properties of the new particle whose discovery was announced last week. The current LHC schedule foresees proton running reaching a conclusion on 16 October, with a proton-ion run scheduled for November. In the preliminary new schedule, proton running is planned to continue until 16 December, ...

  9. A Three-Stage Optimization Algorithm for the Stochastic Parallel Machine Scheduling Problem with Adjustable Production Rates

    Directory of Open Access Journals (Sweden)

    Rui Zhang

    2013-01-01

    Full Text Available We consider a parallel machine scheduling problem with random processing/setup times and adjustable production rates. The objective functions to be minimized consist of two parts; the first part is related with the due date performance (i.e., the tardiness of the jobs, while the second part is related with the setting of machine speeds. Therefore, the decision variables include both the production schedule (sequences of jobs and the production rate of each machine. The optimization process, however, is significantly complicated by the stochastic factors in the manufacturing system. To address the difficulty, a simulation-based three-stage optimization framework is presented in this paper for high-quality robust solutions to the integrated scheduling problem. The first stage (crude optimization is featured by the ordinal optimization theory, the second stage (finer optimization is implemented with a metaheuristic called differential evolution, and the third stage (fine-tuning is characterized by a perturbation-based local search. Finally, computational experiments are conducted to verify the effectiveness of the proposed approach. Sensitivity analysis and practical implications are also discussed.

  10. Psychosocial aspects of work and health in the North Sea oil and gas industry. Pt. 5: offshore work/leave schedules: data analyses and review

    Energy Technology Data Exchange (ETDEWEB)

    Parkes, K.R.; Clark, M.J.

    1997-09-01

    The work described in this report draws on a variety of sources to examine the psychosocial implications of three-week offshore tours as compared with the more usual two-week tour duration. Little of the information currently available about the psychosocial environment offshore, and the mental and physical health of offshore employees, relates to personnel working three-week tours. The present study, intended as a preliminary exploration of responses to three-week offshore schedules, brings together the several different kinds of information. The report includes: A brief review of relevant literature; a comparison of different work/leave patterns in terms of the attitudes and preferences of offshore personnel (N=1462); Analysis of questionnaire data evaluating the reactions of offshore personnel (N=113) to plans to change from two-week to three-week tours; A pilot study of mood and sleep patterns among personnel working either a two-week or a three-week tour at the time of data collection; material from interviews with wives of offshore personnel, focusing on family issues associated with offshore employment, including work/leave cycles. (UK)

  11. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  12. Evaluation of different time schedules in training with the Da Vinci simulator.

    Science.gov (United States)

    Güldner, C; Orth, A; Dworschak, P; Diogo, I; Mandapathil, M; Teymoortash, A; Walliczek-Dworschak, U

    2017-10-01

    This prospective study analyzed the effect of different time schedules in training on the main performance outcomes: overall score, time to complete, and economy of motion. The study was performed on the da Vinci Skills Simulator from December 2014 to April 2016. Forty robotic novices were randomized into two groups of 20 participants, which trained in the same three exercises but with different intervals between their training sessions. Each group performed training in Peg Board 1 in their first week, Match Board 2 in their second week, and Ring and Rail 2 in their third week. On their last day, Needle Targeting and Energy Dissection 2, for which no previous training had been received, were performed. Regarding the different training intervals, group 1 trained each exercise six times in a row once a week. Group 2 performed their training once a day for 5 days. Technical performance parameters were recorded by the Mimics simulator software for further analysis. In addition, the participants were asked to fill out a questionnaire concerning the robotics training. Group 2 performed significantly better compared to group 1 in the main metrics in the more advanced exercises. For the easier exercises, the training frequency did not lead to significant differences in performance outcome. A significant skills gain was seen between the first and last training sessions for all exercises in both groups. Performance in the final exercise NT was significantly better in group 2 than group 1. Regarding ED 2, no difference was found between the two groups. As the training of group 2 led to significantly better outcomes, we suggest that, especially for advanced exercises, it seems to be more favorable to perform training every day for a short period than to train once a week six times in a row.

  13. A radiotherapeutic clinical trial of twice per week vs. five times per week in oral cancer

    International Nuclear Information System (INIS)

    Handa, K.; Edoliya, T.N.; Pandey, R.P.; Agarwal, Y.C.; Sinha, N.

    1980-01-01

    135 cases of oral cancer have been treated by two fractions per week, and the results are compared with 115 approximately identical cases treated by conventional five days a week schedule with other parameters being identical. Radical irradiation was done by 6000 to 6500 rd in 6-6 1/2 weeks (NSD 1800-1900 ret) and palliative dose was 4500 R4 weeks (NSD 1532 ret). Tumour regression was found markedly superior by conventional regime in radically irradiated cases but much less superior for palliative treatment. Acute and late reaction as well as tumour control at 1 year was better with daily treatment, more so in cases treated for radical cure, while in palliative treatment, the superiority of daily regime was less marked. Our study provides evidence that only for palliation in advanced cases, radiation therapy by 2 fractions a week can be alternatively used. (orig.) [de

  14. 29 CFR 825.205 - Increments of FMLA leave for intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... intermittent leave or working a reduced leave schedule to commence or end work mid-way through a shift, such as... per week, but works only 20 hours a week under a reduced leave schedule, the employee's ten hours of... 29 Labor 3 2010-07-01 2010-07-01 false Increments of FMLA leave for intermittent or reduced...

  15. A week for records… and things of record

    CERN Multimedia

    2015-01-01

    This week, the LHC set an important record on the way to the start of data taking for Run 2. At around 10.30 p.m. on Wednesday, 20 May, two bunches of particles were brought into collision at 13 TeV for the first time as part of the commissioning process for the systems that protect the detectors from stray particles. This milestone triggered ripples of excitement around the Laboratory and, coming right on schedule, is a clear sign that we are on course for physics data taking to start at the beginning of June. My congratulations go to all involved.   That was not the only record set this week: there was a sporting record as well. On Thursday, nearly 800 of you ran the traditional CERN Relay Race with 129 teams competing along with nine Nordic walkers, easily breaking the previous record of 108 teams set in 2013. However, despite so many pretenders to the crown, the course record of 10 minutes and 33 seconds set by the VELOcity team in 2013 still stands. Staying with a sporting theme, the an...

  16. Annual spatiotemporal migration schedules in three larger insectivorous birds

    DEFF Research Database (Denmark)

    Jacobsen, Lars Bo; Jensen, Niels Odder; Willemoes, Mikkel

    2017-01-01

    Background: Knowledge of spatiotemporal migration patterns is important for our understanding of migration ecology and ultimately conservation of migratory species. We studied the annual migration schedules of European nightjar, a large nocturnal insectivore and compared it with two other larger ...

  17. AGOR 28: SIO Shipyard Representative Bi-Weekly Progress Report

    Science.gov (United States)

    2016-06-18

    Sally Ride. • Two full 20-foot IOL shipping containers scheduled for delivery DCI on Monday. • Spares Load out scheduled for next week. 4. Operator...the silty water. 2 • Anchor Windlass – Design using “ulster” chain guide is progressing. Yesterday’s development regarding foreign chain...J-1 at sustained speed. See Airborne Noise Survey Report (DI-032-006) for more information (Delete after RFW approved) 1137 HVAC - There were no

  18. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  19. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  20. Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N

    2009-11-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.

  1. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  2. Implications of Nontraditional Work Schedules for Women

    Science.gov (United States)

    Polit, Denise F.

    1978-01-01

    Issues, evidence, and arguments relating to the effects of alternative working arrangements on the lives of women are examined. Forms of nontraditional schedules which are analyzed include the shortened work week, flexible working hours, and part-time employment. (Author/GC)

  3. A three-stage heuristic for harvest scheduling with access road network development

    Science.gov (United States)

    Mark M. Clark; Russell D. Meller; Timothy P. McDonald

    2000-01-01

    In this article we present a new model for the scheduling of forest harvesting with spatial and temporal constraints. Our approach is unique in that we incorporate access road network development into the harvest scheduling selection process. Due to the difficulty of solving the problem optimally, we develop a heuristic that consists of a solution construction stage...

  4. Six weeks of aerobic dance exercise improves blood oxidative stress status and increases interleukin-2 in previously sedentary women.

    Science.gov (United States)

    Leelarungrayub, Donrawee; Saidee, Kunteera; Pothongsunun, Prapas; Pratanaphon, Sainetee; YanKai, Araya; Bloomer, Richard J

    2011-07-01

    This study evaluated the change in blood oxidative stress, blood interleukin-2, and physical performance following 6 weeks of moderate intensity and duration aerobic dance exercise in 24 sedentary women. Blood samples were collected at rest twice before (baseline) and after the 6-week intervention for analysis of protein hydroperoxide (PrOOH), malondialdehyde (MDA), total anti-oxidant capacity (TAC), and interleukin-2 (IL-2) levels. Maximal treadmill run time (Time(max)) and maximal oxygen consumption (VO(2max)) were also measured. All variables were statistically analyzed with a repeated measurement ANOVA and Tukey post hoc. No differences were noted in any variable during the baseline period (p > 0.05). After aerobic dance exercise, VO(2max), Time(max), TAC and IL-2 were significantly increased, whereas MDA levels were decreased significantly (p exercise. It can be concluded that aerobic dance exercise at a moderate intensity and duration can improve physical fitness, decrease MDA, and increase TAC and IL-2 in previously sedentary women. Copyright © 2010 Elsevier Ltd. All rights reserved.

  5. EoC Study Update to Examine the Cost, Schedule and Technical Changes to NASA Projects

    Science.gov (United States)

    Bitten, Bob; Emmons, Debra; Shinn, Stephen; Scolese, Chris

    2018-01-01

    The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different bins that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one 'magic bullet' consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.

  6. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  7. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  8. Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off

    Directory of Open Access Journals (Sweden)

    Chun-Cheng Lin

    2014-01-01

    Full Text Available When it comes to nurse shift schedules, it is found that the nursing staff have diverse preferences about shift rotations and days-off. The previous studies only focused on the most preferred work shift and the number of satisfactory days-off of the schedule at the current schedule period but had few discussions on the previous schedule periods and other preference levels for shifts and days-off, which may affect fairness of shift schedules. As a result, this paper proposes a nurse scheduling model based upon integer programming that takes into account constraints of the schedule, different preference ranks towards each shift, and the historical data of previous schedule periods to maximize the satisfaction of all the nursing staff's preferences about the shift schedule. The main contribution of the proposed model is that we consider that the nursing staff’s satisfaction level is affected by multiple preference ranks and their priority ordering to be scheduled, so that the quality of the generated shift schedule is more reasonable. Numerical results show that the planned shifts and days-off are fair and successfully meet the preferences of all the nursing staff.

  9. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  10. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  11. Evolutionarily stable learning schedules and cumulative culture in discrete generation models.

    Science.gov (United States)

    Aoki, Kenichi; Wakano, Joe Yuichiro; Lehmann, Laurent

    2012-06-01

    Individual learning (e.g., trial-and-error) and social learning (e.g., imitation) are alternative ways of acquiring and expressing the appropriate phenotype in an environment. The optimal choice between using individual learning and/or social learning may be dictated by the life-stage or age of an organism. Of special interest is a learning schedule in which social learning precedes individual learning, because such a schedule is apparently a necessary condition for cumulative culture. Assuming two obligatory learning stages per discrete generation, we obtain the evolutionarily stable learning schedules for the three situations where the environment is constant, fluctuates between generations, or fluctuates within generations. During each learning stage, we assume that an organism may target the optimal phenotype in the current environment by individual learning, and/or the mature phenotype of the previous generation by oblique social learning. In the absence of exogenous costs to learning, the evolutionarily stable learning schedules are predicted to be either pure social learning followed by pure individual learning ("bang-bang" control) or pure individual learning at both stages ("flat" control). Moreover, we find for each situation that the evolutionarily stable learning schedule is also the one that optimizes the learned phenotype at equilibrium. Copyright © 2012 Elsevier Inc. All rights reserved.

  12. Comparison of three rapamycin dosing schedules in A/J Tsc2+/- mice and improved survival with angiogenesis inhibitor or asparaginase treatment in mice with subcutaneous tuberous sclerosis related tumors

    Directory of Open Access Journals (Sweden)

    Dabora Sandra L

    2010-02-01

    Full Text Available Abstract Background Tuberous Sclerosis Complex (TSC is an autosomal dominant tumor disorder characterized by the growth of hamartomas in various organs including the kidney, brain, skin, lungs, and heart. Rapamycin has been shown to reduce the size of kidney angiomyolipomas associated with TSC; however, tumor regression is incomplete and kidney angiomyolipomas regrow after cessation of treatment. Mouse models of TSC2 related tumors are useful for evaluating new approaches to drug therapy for TSC. Methods In cohorts of Tsc2+/- mice, we compared kidney cystadenoma severity in A/J and C57BL/6 mouse strains at both 9 and 12 months of age. We also investigated age related kidney tumor progression and compared three different rapamycin treatment schedules in cohorts of A/J Tsc2+/- mice. In addition, we used nude mice bearing Tsc2-/- subcutaneous tumors to evaluate the therapeutic utility of sunitinib, bevacizumab, vincristine, and asparaginase. Results TSC related kidney disease severity is 5-10 fold higher in A/J Tsc2+/- mice compared with C57BL/6 Tsc2+/- mice. Similar to kidney angiomyolipomas associated with TSC, the severity of kidney cystadenomas increases with age in A/J Tsc2+/- mice. When rapamycin dosing schedules were compared in A/J Tsc2+/- cohorts, we observed a 66% reduction in kidney tumor burden in mice treated daily for 4 weeks, an 82% reduction in mice treated daily for 4 weeks followed by weekly for 8 weeks, and an 81% reduction in mice treated weekly for 12 weeks. In the Tsc2-/- subcutaneous tumor mouse model, vincristine is not effective, but angiogenesis inhibitors (sunitinib and bevacizumab and asparaginase are effective as single agents. However, these drugs are not as effective as rapamycin in that they increased median survival only by 24-27%, while rapamycin increased median survival by 173%. Conclusions Our results indicate that the A/J Tsc2+/- mouse model is an improved, higher through-put mouse model for future TSC

  13. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  14. Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

    Science.gov (United States)

    Knight, Russell; Mishkin, Andrew; Allbaugh, Alicia

    2014-01-01

    Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

  15. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  16. A multi-criteria model for maintenance job scheduling

    Directory of Open Access Journals (Sweden)

    Sunday A. Oke

    2007-12-01

    Full Text Available This paper presents a multi-criteria maintenance job scheduling model, which is formulated using a weighted multi-criteria integer linear programming maintenance scheduling framework. Three criteria, which have direct relationship with the primary objectives of a typical production setting, were used. These criteria are namely minimization of equipment idle time, manpower idle time and lateness of job with unit parity. The mathematical model constrained by available equipment, manpower and job available time within planning horizon was tested with a 10-job, 8-hour time horizon problem with declared equipment and manpower available as against the required. The results, analysis and illustrations justify multi-criteria consideration. Thus, maintenance managers are equipped with a tool for adequate decision making that guides against error in the accumulated data which may lead to wrong decision making. The idea presented is new since it provides an approach that has not been documented previously in the literature.

  17. The Growing Diversity of Work Schedules.

    Science.gov (United States)

    Smith, Shirley J.

    1986-01-01

    The author highlights the predominance of the five-day, 40-hour workweek. Although finding little change in recent years in the proportion of workers on 40-hour schedules, Smith notes that there have been some changes in work patterns, with a still small but growing group of workers on "compressed" full-time weeks of less than five days.…

  18. Brief-stimulus presentations on multiform tandem schedules

    OpenAIRE

    Reed, Phil

    1994-01-01

    Three experiments examined the influence of a brief stimulus (a light) on the behavior of food-deprived rats whose lever pressing on tandem schedules comprising components of different schedule types resulted in food presentation. In Experiment 1, either a tandem variable-ratio variable-interval or a tandem variable-interval variable-ratio schedule was used. The variable-interval requirement in the tandem variable-ratio variable-interval schedule was yoked to the time taken to complete the va...

  19. Influences on Cocaine Tolerance Assessed under a Multiple Conjunctive Schedule of Reinforcement

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N.

    2009-01-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the…

  20. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  1. Schedule unreliability in liner shipping : Origins and consequences for the hinterland supply chain

    NARCIS (Netherlands)

    Vernimmen, Bert; Dullaert, Wout; Engelen, Steve

    Despite claims by shipping lines that most of their containerships operate on fixed-day weekly schedules, a large survey recently revealed that over 40 of the vessels deployed on worldwide liner services arrive one or more days behind schedule. Broadly speaking, the survey found relatively low

  2. Project Robust Scheduling Based on the Scattered Buffer Technology

    Directory of Open Access Journals (Sweden)

    Nansheng Pang

    2018-04-01

    Full Text Available The research object in this paper is the sub network formed by the predecessor’s affect on the solution activity. This paper is to study three types of influencing factors from the predecessors that lead to the delay of starting time of the solution activity on the longest path, and to analyze the influence degree on the delay of the solution activity’s starting time from different types of factors. On this basis, through the comprehensive analysis of various factors that influence the solution activity, this paper proposes a metric that is used to evaluate the solution robustness of the project scheduling, and this metric is taken as the optimization goal. This paper also adopts the iterative process to design a scattered buffer heuristics algorithm based on the robust scheduling of the time buffer. At the same time, the resource flow network is introduced in this algorithm, using the tabu search algorithm to solve baseline scheduling. For the generation of resource flow network in the baseline scheduling, this algorithm designs a resource allocation algorithm with the maximum use of the precedence relations. Finally, the algorithm proposed in this paper and some other algorithms in previous literature are taken into the simulation experiment; under the comparative analysis, the experimental results show that the algorithm proposed in this paper is reasonable and feasible.

  3. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  4. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  5. Game Schedules and Rate of Concussions in the National Football League.

    Science.gov (United States)

    Teramoto, Masaru; Cushman, Daniel M; Cross, Chad L; Curtiss, Heather M; Willick, Stuart E

    2017-11-01

    Concussion prevention in the National Football League (NFL) is an important priority for player safety. The NFL now has modified game schedules, and one concern is that unconventional game schedules, such as a shortened rest period due to playing on a Thursday rather than during the weekend, may lead to an increased risk of injuries. Unconventional game schedules in the NFL are associated with an increased rate of concussion. Descriptive epidemiological study. This study analyzed concussions and game schedules over the NFL regular seasons from 2012 to 2015 (4 years). Documented numbers of concussions, identified by use of the online database PBS Frontline Concussion Watch, were summarized by regular-season weeks. Association of days of rest and game location (home, away, or overseas) with the rate of concussion was examined by use of the χ 2 test. Logistic regression analysis was performed to examine the relationships of days of rest and home/away games to the risk of repeated concussions, with adjustment for player position. A total of 582 concussions were analyzed in this study. A significantly greater number of concussions occurred in the second half of the season ( P game location, or timing of the bye week by the team or the opponent ( P > .05). Game schedules were not significantly associated with the occurrence of repeat concussions ( P > .05). Unconventional game schedules in the NFL, including playing on Thursday and playing overseas, do not seem to put players at increased risk of concussions.

  6. The Rewards of a Four-Day School Week.

    Science.gov (United States)

    Featherstone, Helen

    1991-01-01

    Instead of cutting art, music, or physical education, the usual victims of budgetary shortfalls, the principal and staff of a New Hampshire elementary school balanced their 1981 budget by adopting a "temporary" Monday-Thursday schedule that remains operational today. The four-day week has brought a dramatic drop in teacher absenteeism…

  7. Algorithm comparison for schedule optimization in MR fingerprinting.

    Science.gov (United States)

    Cohen, Ouri; Rosen, Matthew S

    2017-09-01

    In MR Fingerprinting, the flip angles and repetition times are chosen according to a pseudorandom schedule. In previous work, we have shown that maximizing the discrimination between different tissue types by optimizing the acquisition schedule allows reductions in the number of measurements required. The ideal optimization algorithm for this application remains unknown, however. In this work we examine several different optimization algorithms to determine the one best suited for optimizing MR Fingerprinting acquisition schedules. Copyright © 2017 Elsevier Inc. All rights reserved.

  8. Comparison of two dose and three dose human papillomavirus vaccine schedules: cost effectiveness analysis based on transmission model.

    Science.gov (United States)

    Jit, Mark; Brisson, Marc; Laprise, Jean-François; Choi, Yoon Hong

    2015-01-06

    To investigate the incremental cost effectiveness of two dose human papillomavirus vaccination and of additionally giving a third dose. Cost effectiveness study based on a transmission dynamic model of human papillomavirus vaccination. Two dose schedules for bivalent or quadrivalent human papillomavirus vaccines were assumed to provide 10, 20, or 30 years' vaccine type protection and cross protection or lifelong vaccine type protection without cross protection. Three dose schedules were assumed to give lifelong vaccine type and cross protection. United Kingdom. Males and females aged 12-74 years. No, two, or three doses of human papillomavirus vaccine given routinely to 12 year old girls, with an initial catch-up campaign to 18 years. Costs (from the healthcare provider's perspective), health related utilities, and incremental cost effectiveness ratios. Giving at least two doses of vaccine seems to be highly cost effective across the entire range of scenarios considered at the quadrivalent vaccine list price of £86.50 (€109.23; $136.00) per dose. If two doses give only 10 years' protection but adding a third dose extends this to lifetime protection, then the third dose also seems to be cost effective at £86.50 per dose (median incremental cost effectiveness ratio £17,000, interquartile range £11,700-£25,800). If two doses protect for more than 20 years, then the third dose will have to be priced substantially lower (median threshold price £31, interquartile range £28-£35) to be cost effective. Results are similar for a bivalent vaccine priced at £80.50 per dose and when the same scenarios are explored by parameterising a Canadian model (HPV-ADVISE) with economic data from the United Kingdom. Two dose human papillomavirus vaccine schedules are likely to be the most cost effective option provided protection lasts for at least 20 years. As the precise duration of two dose schedules may not be known for decades, cohorts given two doses should be closely

  9. Feasibility, Safety, and Efficacy of an Alternative Schedule of Sunitinib for the Treatment of Patients with Metastatic Renal Cell Carcinoma: A Retrospective Study.

    Science.gov (United States)

    Buti, Sebastiano; Donini, Maddalena; Bersanelli, Melissa; Gattara, Alessia; Leonardi, Francesco; Passalacqua, Rodolfo

    2017-12-01

    Standard treatment with sunitinib for patients with metastatic renal cancer provides an 'on-off' schedule (daily administration of a 50-mg capsule for 4 weeks, followed by a 2-week break; consecutive 6-week cycles). We developed an alternative intermittent schedule to reduce the toxicity and symptoms of tumor regrowth during the rest period and to allow prolonged continuation of therapy, maintaining dose intensity. The objective of this study was to provide a retrospective evaluation of the feasibility, safety, and efficacy of an alternative schedule of sunitinib in patients who did not tolerate classical treatment. Patients treated with the classical schedule with at least grade 2 toxicity or recurrence of symptoms during the rest period were switched to an alternative schedule (the same daily dose 5 consecutive days per week for 5 weeks and then the same daily dose on days 1, 3, and 5 in the sixth week; consecutive 6-week cycles). Twenty-five patients were enrolled. The median time from sunitinib initiation to schedule switch was 2.9 months. After the switch, the median therapy duration was 9.2 months. Rate of delay, corrected by cycle number, was 10% for both schedules. After the switch, 48.7% of patients obtained a toxicity reduction (hypertension -82%, stomatitis -71%, cutaneous toxicity -69%). A reduction in 'on-off symptoms' (-86%) was achieved. Overall response rate was 40% and the disease control rate was 80%. Median progression-free survival was 16.4 months and median overall survival was 41.3 months. Despite the small sample size and retrospective nature, we demonstrated the feasibility, safety, and efficacy of the alternative schedule, allowing prolonged treatment and better quality of life.

  10. A Metaheuristic Scheduler for Time Division Multiplexed Network-on-Chip

    DEFF Research Database (Denmark)

    Sørensen, Rasmus Bo; Sparsø, Jens; Pedersen, Mark Ruvald

    2014-01-01

    significant practical implications, is the minimization of the TDM schedule period by over-provisioning bandwidth to connections with the smallest bandwidth requirements. Our results show that this is possible with only negligible impact on the schedule period. We evaluate the scheduler with seven different...... applications from the MCSL NOC benchmark suite. In the special case of all-to-all communication with equal bandwidths on all communication channels, we obtain schedules with a shorter period than reported in previous work....

  11. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  12. Randomized Clinical Trial of Weekly vs. Triweekly Cisplatin-Based Chemotherapy Concurrent With Radiotherapy in the Treatment of Locally Advanced Cervical Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, Sang-Young, E-mail: ryu@kcch.re.kr [Department of Obstetrics and Gynecology, Korea Cancer Center Hospital, Korea Institute of Radiological and Medical Sciences, Seoul (Korea, Republic of); Lee, Won-Moo; Kim, Kidong [Department of Obstetrics and Gynecology, Korea Cancer Center Hospital, Korea Institute of Radiological and Medical Sciences, Seoul (Korea, Republic of); Park, Sang-Il [Department of Gynecologic Oncology, Dongnam Institute of Radiological and Medical Sciences, Busan (Korea, Republic of); Kim, Beob-Jong; Kim, Moon-Hong; Choi, Seok-Cheol [Department of Obstetrics and Gynecology, Korea Cancer Center Hospital, Korea Institute of Radiological and Medical Sciences, Seoul (Korea, Republic of); Cho, Chul-Koo [Department of Radiation Oncology, Korea Cancer Center Hospital, Korea Institute of Radiological and Medical Sciences, Seoul (Korea, Republic of); Nam, Byung-Ho [Cancer Biostatistics Branch, Research Institute and Hospital, National Cancer Center, Goyang (Korea, Republic of); Lee, Eui-Don [Department of Gynecologic Oncology, Dongnam Institute of Radiological and Medical Sciences, Busan (Korea, Republic of)

    2011-11-15

    Purpose: To compare compliance, toxicity, and outcome of weekly and triweekly cisplatin administration concurrent with radiotherapy in locally advanced cervical cancer. Methods and Materials: In this open-label, randomized trial, 104 patients with histologically proven Stage IIB-IVA cervical cancer were randomly assigned by a computer-generated procedure to weekly (weekly cisplatin 40 mg/m{sup 2}, six cycles) and triweekly (cisplatin 75 mg/m{sup 2} every 3 weeks, three cycles) chemotherapy arms during concurrent radiotherapy. The difference of compliance and the toxicity profiles between the two arms were investigated, and the overall survival rate was analyzed after 5 years. Results: All patients tolerated both treatments very well, with a high completion rate of scheduled chemotherapy cycles. There was no statistically significant difference in compliance between the two arms (86.3% in the weekly arm, 92.5% in the triweekly arm, p > 0.05). Grade 3-4 neutropenia was more frequent in the weekly arm (39.2%) than in the triweekly arm (22.6%) (p = 0.03). The overall 5-year survival rate was significantly higher in the triweekly arm (88.7%) than in the weekly arm (66.5%) (hazard ratio 0.375; 95% confidence interval 0.154-0.914; p = 0.03). Conclusions: Triweekly cisplatin 75-mg/m{sup 2} chemotherapy concurrent with radiotherapy is more effective and feasible than the conventional weekly cisplatin 40-mg/m{sup 2} regimen and may be a strong candidate for the optimal cisplatin dose and dosing schedule in the treatment of locally advanced cervical cancer.

  13. Case scheduling preferences of one Surgeon's cataract surgery patients.

    Science.gov (United States)

    Dexter, Franklin; Birchansky, Lee; Bernstein, James M; Wachtel, Ruth E

    2009-02-01

    The increase in the number of operating rooms nationwide in the United States may reflect preferences of patients for scheduling of outpatient surgery. Yet, little is known of the importance that patients place on scheduling convenience and flexibility. Fifty cataract surgery patients seen by a surgeon at his main office during a 6-mo period responded to a marketing survey. All the patients had Medicare insurance and supplemental insurance permitting surgery at any facility. A telephone questionnaire included four vignettes describing different choices in the scheduling of cataract surgery. Respondents were asked how far they would be willing to travel for one option instead of another. For example, "Your surgery will be on Thursday in three weeks at 2 pm. You can drink water until 9 am. You arrive at 10 am, because your surgery might start early. If you travel farther, you would arrive at 8 am for 9 am surgery." The median (50th percentile) additional travel time was 60 min (lower 95% confidence bound >or=52 min) for each of four options: to receive care on a day chosen by the patient instead of assigned by the physician, to receive care at a single site instead of both the surgeon's office and a surgery center at a different location, to combine the examination and the surgery into a single visit instead of two visits, and to have surgery in the morning instead of the afternoon. The patients of this ophthalmologist placed a high value on convenience and flexibility in scheduling their surgery. In general, this would be achievable only if many operating rooms were available each morning.

  14. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  15. Sleep and health in oil rig workers--before and after a two week work period offshore.

    Science.gov (United States)

    Waage, Siri; Pallesen, Ståle; Moen, Bente Elisabeth; Bjorvatn, Bjørn

    2013-01-01

    This study compared subjective sleep and subjective health complaints among Norwegian oil rig workers, before and after a two week work period. The study also compared differences between two different work schedules. The workers worked either two weeks of day shift (n=90) or two weeks of a swing shift schedule (n=93), involving one week of night shifts, immediately followed by one week of day shifts. Overall, the workers reported significantly poorer sleep quality and more complaints of insomnia at the end compared to the start of the work period. However, there was no significant difference in terms of subjective health complaints. Furthermore, there were no clear differences in changes in sleep quality, insomnia or subjective health complaints during the work period between day- and swing shift workers. However, at the end of the work period a higher proportion of insomniacs were seen among swing shift workers compared with day workers. To conclude, sleep quality and complaints of insomnia became worse during the work period. However, there were few differences in changes in terms of sleep or subjective health complaints between day- and swing shift, suggesting that 12 h day shift affected sleep and health similarly to the schedule involving night work.

  16. The immune response is affected for at least three weeks after extensive surgery for ovarian cancer

    DEFF Research Database (Denmark)

    Brøchner, Anne Craveiro; Mikkelsen, Søren; Hegelund, Iørn

    2016-01-01

    INTRODUCTION: The treatment of women with ovarian cancer in advanced stages consists of extensive surgery followed by chemotherapy initiated three weeks after surgery. In this study, selected immune parameters were investigated to elucidate when the immune system is normalised following the opera......INTRODUCTION: The treatment of women with ovarian cancer in advanced stages consists of extensive surgery followed by chemotherapy initiated three weeks after surgery. In this study, selected immune parameters were investigated to elucidate when the immune system is normalised following......, interleukin-10 and the activity and total frequency of natural killer cells were measured. RESULTS: Interleukin-6 and interleukin-10 were significantly elevated immediately after the operation and also after 21 days. The total population of natural killercells and the total activity were reduced. The total...

  17. More with Four: A Look at the Four Day Week in Oregon's Small Schools.

    Science.gov (United States)

    Reinke, Joyce M.

    The 4-day school week offers solutions to the financial and instructional problems often faced by small rural schools. Two southern Oregon schools implemented the 4-day school week on a trial basis in 1982-83 and, along with five eastern Oregon districts, continue to use this schedule today. The primary purpose of the change to a 4-day week was…

  18. Schedulability of Herschel revisited using statistical model checking

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Legay, Axel

    2015-01-01

    -approximation technique. We can safely conclude that the system is schedulable for varying values of BCET. For the cases where deadlines are violated, we use polyhedra to try to confirm the witnesses. Our alternative method to confirm non-schedulability uses statistical model-checking (SMC) to generate counter...... and blocking times of tasks. Consequently, the method may falsely declare deadline violations that will never occur during execution. This paper is a continuation of previous work of the authors in applying extended timed automata model checking (using the tool UPPAAL) to obtain more exact schedulability...... analysis, here in the presence of non-deterministic computation times of tasks given by intervals [BCET,WCET]. Computation intervals with preemptive schedulers make the schedulability analysis of the resulting task model undecidable. Our contribution is to propose a combination of model checking techniques...

  19. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission.

    Science.gov (United States)

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-06-09

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami- m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs.

  20. Best Speed Fit EDF Scheduling for Performance Asymmetric Multiprocessors

    Directory of Open Access Journals (Sweden)

    Peng Wu

    2017-01-01

    Full Text Available In order to improve the performance of a real-time system, asymmetric multiprocessors have been proposed. The benefits of improved system performance and reduced power consumption from such architectures cannot be fully exploited unless suitable task scheduling and task allocation approaches are implemented at the operating system level. Unfortunately, most of the previous research on scheduling algorithms for performance asymmetric multiprocessors is focused on task priority assignment. They simply assign the highest priority task to the fastest processor. In this paper, we propose BSF-EDF (best speed fit for earliest deadline first for performance asymmetric multiprocessor scheduling. This approach chooses a suitable processor rather than the fastest one, when allocating tasks. With this proposed BSF-EDF scheduling, we also derive an effective schedulability test.

  1. Duration of protection against hepatitis A for the current two-dose vaccine compared to a three-dose vaccine schedule in children

    Science.gov (United States)

    Raczniak, Gregory A.; Thomas, Timothy K.; Bulkow, Lisa R.; Negus, Susan E.; Zanis, Carolyn L.; Bruce, Michael G.; Spradling, Philip R.; Teshale, Eyasu H.; McMahon, Brian J.

    2015-01-01

    Background Hepatitis A is mostly a self-limiting disease but causes substantial economic burden. Consequently, United States Advisory Committee for Immunization Practices recommends inactivated hepatitis A vaccination for all children beginning at age 1 year and for high risk adults. The hepatitis A vaccine is highly effective but the duration of protection is unknown. Methods We examined the proportion of children with protective hepatitis A antibody levels (anti-HAV ≥20 mIU/mL) as well as the geometric mean concentration (GMC) of anti-HAV in a cross sectional convenience sample of individuals aged 12–24 years, who had been vaccinated with a two-dose schedule in childhood, with the initial dose at least 5 years ago. We compared a subset of data from persons vaccinated with two-doses (720 EL.U.) at age 3–6 years with a demographically similar prospective cohort that received a three-dose (360 EL.U.) schedule and have been followed for 17 years. Results No significant differences were observed when comparing GMC between the two cohorts at 10 (P = 0.467), 12 (P = 0.496), and 14 (P = 0.175) years post-immunization. For the three-dose cohort, protective antibody levels remain for 17 years and have leveled-off over the past 7 years. Conclusion The two- and three-dose schedules provide similar protection >14 years after vaccination, indicating a booster dose is not needed at this time. Plateauing anti-HAV GMC levels suggest protective antibody levels may persist long-term. PMID:23470239

  2. Solving Large Scale Crew Scheduling Problems in Practice

    NARCIS (Netherlands)

    E.J.W. Abbink (Erwin); L. Albino; T.A.B. Dollevoet (Twan); D. Huisman (Dennis); J. Roussado; R.L. Saldanha

    2010-01-01

    textabstractThis paper deals with large-scale crew scheduling problems arising at the Dutch railway operator, Netherlands Railways (NS). NS operates about 30,000 trains a week. All these trains need a driver and a certain number of guards. Some labor rules restrict the duties of a certain crew base

  3. Six-Month Results for the Kelly Air Force Base Compressed Work Week Survey

    Science.gov (United States)

    1993-07-01

    plans to continue the CWS past the 1-year original plan. REFERENCES 1. Balch, B.W. The four day week and the older workers. Personnel Journal, 394-396...8217 perceptions of the four - day week . California Management Review, 28, 31-35, 1975. 15. Mills, M.E. Core-12: A controlled study of the impact of 12 hour scheduling

  4. Self-selection in participation in the first health survey, three weeks after a man-made disaster.

    NARCIS (Netherlands)

    Grievink, L.; Velden, P.G. van der; Yzermans, C.J.; Roorda, J.; Stellato, R.K.

    2005-01-01

    Background: Three weeks after a firework disaster in Enschede, The Netherlands, a health survey was performed among survivors. The primary aims of the study were collecting data for health care policy making and decreasing uncertainty concerning exposure to toxic substances. Therefore, each

  5. An Integrated Constraint Programming Approach to Scheduling Sports Leagues with Divisional and Round-robin Tournaments

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Mats; Johansson, Mikael; Larson, Jeffrey

    2014-01-01

    Previous approaches for scheduling a league with round-robin and divisional tournaments involved decomposing the problem into easier subproblems. This approach, used to schedule the top Swedish handball league Elitserien, reduces the problem complexity but can result in suboptimal schedules. This paper presents an integrated constraint programming model that allows to perform the scheduling in a single step. Particular attention is given to identifying implied and symmetry-breaking constraints that reduce the computational complexity significantly. The experimental evaluation of the integrated approach takes considerably less computational effort than the previous approach.

  6. Effects of prolonged stress on salivary cortisol and dehydroepiandrosterone: a study of a two-week teaching practice.

    Science.gov (United States)

    Izawa, Shuhei; Saito, Keisuke; Shirotsuki, Kentaro; Sugaya, Nagisa; Nomura, Shinobu

    2012-06-01

    This study investigated variations in salivary levels of cortisol and dehydroepiandrosterone (DHEA) in a prolonged stressful situation (a two-week teaching practice). Thirty-three women for whom a two-week teaching practice at a kindergarten was scheduled were asked to collect saliva samples at awakening, 30 min after awakening, and bedtime at four time points: two weeks before the practice, the first week of the practice, the second week of the practice, and a few days after the practice. In addition, they completed questionnaires for assessing perceived stress and subjective moods on each day. A linear mixed model indicated that cortisol levels significantly increased during the first and second week of the practice compared with those before and after the practice period, and that DHEA levels significantly decreased after the practice period compared with those at the other time points. Further, cortisol awakening response after the practice period significantly reduced compared with that at the other time points. Scores of perceived stress and negative moods were also higher during the practice period. This study showed that prolonged stress affected cortisol and DHEA secretion during as well as after the stress period. Copyright © 2011 Elsevier Ltd. All rights reserved.

  7. Revisiting the rotating call schedule in less than 80 hours per week.

    Science.gov (United States)

    Roses, Robert E; Foley, Paul J; Paulson, Emily C; Pray, Lori; Kelz, Rachel R; Williams, Noel N; Morris, Jon B

    2009-01-01

    The Accreditation Council for Graduate Medical Education (ACGME) work-hour restrictions have prompted many surgical training programs to adopt a night-float resident coverage system (NF). Dissatisfaction with NF prompted us to transition to a rotating junior resident call model (Q4) with 24-hour call shifts at the outset of the 2007-2008 academic year. We performed a prospective study to determine the influence of this transition on resident education, morale, and quality of life, as well as on ACGME work rule compliance and American Board of Surgery In-Training Examination (ABSITE) scores. Residents were surveyed after 1 year of NF and again 1 year after the introduction of Q4. Responses to a series of statements about the influence of the call model (NF or Q4) on educational opportunities and morale were solicited. The survey used a 5-point Likert response scale (1 = complete disagreement to 5 = complete agreement). Median values of participant responses were calculated and compared using the Wilcoxon rank-sum test. Compliance with ACGME work rules, ABSITE scores, and operative case logs from the 2006-2007 and 2007-2008 academic years were also compared. Residents were significantly more enthusiastic about Q4 compared with NF, particularly when asked about the influence these systems had on morale (median response = 4.0 [Q4] compared with 2.0 [NF]; p = 0.001) and engagement of residents by the teaching faculty (median response = 4.0 [Q4] compared with 1.0 [NF]; p = 0.001). Case logs revealed a similar operative experience for first-year residents irrespective of the call schedule (p = 0.51). Excellent compliance with ACGME work rules was maintained as reflected by the percentage of monthly 80-hour violations per resident months worked (3% [Q4] compared with 0.7% [NF]). No difference was observed in the ABSITE scores of first-year residents (a mean percentile point increase of 1 was found after the introduction of Q4). Educational opportunities, compliance with

  8. Clinical outcome of an alternative fotemustine schedule in elderly patients with recurrent glioblastoma: a mono-institutional retrospective study.

    Science.gov (United States)

    Lombardi, Giuseppe; Bellu, Luisa; Pambuku, Ardi; Della Puppa, Alessandro; Fiduccia, Pasquale; Farina, Miriam; D'Avella, Domenico; Zagonel, Vittorina

    2016-07-01

    The optimal treatment of recurrent glioblastoma (GBM) in elderly patients is unclear. Fotemustine (FTM) is a third-generation nitrosourea showing efficacy in gliomas and it has been used with different schedules in adult patients. We performed, for the first time anywhere, a mono-institutional retrospective study to analyze the clinical outcome of an alternative fotemustine schedule in elderly patients with recurrent GBM. Retrospectively, we analyzed all GBM patients 65 years or older previously treated with the combination of radiation therapy and temozolomide (TMZ), receiving an alternative FTM schedule as second-line treatment at our Oncological Center from October 2011 to October 2014 with an ECOG PS ≤ 2. FTM was administrated at 80 mg/m(2) every 2 weeks for five consecutive administrations (induction phase), and then every 4 weeks at 80 mg/m(2) as maintenance. We enrolled 44 patients, 33 males and 11 females; average age was 70 years. ECOG PS was 0-1 in 80 % of the patients. 38 patients relapsed during temozolomide (TMZ) therapy. MGMT methylation status was analyzed in 34 patients and MGMT was methylated in 53 % of the patients. The median progression free survival (PFS) and overall survival (OS) from FTM treatment was 4.1 months (95 % CI 3.1-5.2) and 7 months (95 % CI 5.2-8.4), respectively. Patients with MGMT methylated status and patients who relapsed after completing TMZ therapy had a longer PFS and OS from the beginning of FTM. Thrombocytopenia was the most frequent grade 3-4 haematological toxicity (9 %). The alternative schedule of FTM may be an active and safe treatment for elderly patients with recurrent glioblastoma, especially patients with methylated MGMT and who relapsed after completing temozolomide therapy.

  9. Predicting Scheduling and Attending for an Oral Cancer Examination

    Science.gov (United States)

    Shepperd, James A.; Emanuel, Amber S.; Howell, Jennifer L.; Logan, Henrietta L.

    2015-01-01

    Background Oral and pharyngeal cancer is highly treatable if diagnosed early, yet late diagnosis is commonplace apparently because of delays in undergoing an oral cancer examination. Purpose We explored predictors of scheduling and attending an oral cancer examination among a sample of Black and White men who were at high risk for oral cancer because they smoked. Methods During an in-person interview, participants (N = 315) from rural Florida learned about oral and pharyngeal cancer, completed survey measures, and were offered a free examination in the next week. Later, participants received a follow-up phone call to explore why they did or did not attend their examination. Results Consistent with the notion that scheduling and attending an oral cancer exam represent distinct decisions, we found that the two outcomes had different predictors. Defensive avoidance and exam efficacy predicted scheduling an examination; exam efficacy and having coping resources, time, and transportation predicted attending the examination. Open-ended responses revealed that the dominant reasons participants offered for missing a scheduled examination was conflicting obligations, forgetting, and confusion or misunderstanding about the examination. Conclusions The results suggest interventions to increase scheduling and attending an oral cancer examination. PMID:26152644

  10. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  11. The DEEP-South: Scheduling and Data Reduction Software System

    Science.gov (United States)

    Yim, Hong-Suh; Kim, Myung-Jin; Bae, Youngho; Moon, Hong-Kyu; Choi, Young-Jun; Roh, Dong-Goo; the DEEP-South Team

    2015-08-01

    The DEep Ecliptic Patrol of the Southern sky (DEEP-South), started in October 2012, is currently in test runs with the first Korea Microlensing Telescope Network (KMTNet) 1.6 m wide-field telescope located at CTIO in Chile. While the primary objective for the DEEP-South is physical characterization of small bodies in the Solar System, it is expected to discover a large number of such bodies, many of them previously unknown.An automatic observation planning and data reduction software subsystem called "The DEEP-South Scheduling and Data reduction System" (the DEEP-South SDS) is currently being designed and implemented for observation planning, data reduction and analysis of huge amount of data with minimum human interaction. The DEEP-South SDS consists of three software subsystems: the DEEP-South Scheduling System (DSS), the Local Data Reduction System (LDR), and the Main Data Reduction System (MDR). The DSS manages observation targets, makes decision on target priority and observation methods, schedules nightly observations, and archive data using the Database Management System (DBMS). The LDR is designed to detect moving objects from CCD images, while the MDR conducts photometry and reconstructs lightcurves. Based on analysis made at the LDR and the MDR, the DSS schedules follow-up observation to be conducted at other KMTNet stations. In the end of 2015, we expect the DEEP-South SDS to achieve a stable operation. We also have a plan to improve the SDS to accomplish finely tuned observation strategy and more efficient data reduction in 2016.

  12. A model of alcohol drinking under an intermittent access schedule using group-housed mice.

    Directory of Open Access Journals (Sweden)

    Magdalena Smutek

    Full Text Available Here, we describe a new model of voluntary alcohol drinking by group-housed mice. The model employs sensor-equipped cages that track the behaviors of the individual animals via implanted radio chips. After the animals were allowed intermittent access to alcohol (three 24 h intervals every week for 4 weeks, the proportions of licks directed toward bottles containing alcohol were 50.9% and 39.6% for the male and female mice, respectively. We used three approaches (i.e., quinine adulteration, a progressive ratio schedule and a schedule involving a risk of punishment to test for symptoms of compulsive alcohol drinking. The addition of 0.01% quinine to the alcohol solution did not significantly affect intake, but 0.03% quinine induced a greater than 5-fold reduction in the number of licks on the alcohol bottles. When the animals were required to perform increasing numbers of instrumental responses to obtain access to the bottle with alcohol (i.e., a progressive ratio schedule, they frequently reached a maximum of 21 responses irrespective of the available reward. Although the mice rarely achieved higher response criteria, the number of attempts was ∼ 10 times greater in case of alcohol than water. We have developed an approach for mapping social interactions among animals that is based on analysis of the sequences of entries into the cage corners. This approach allowed us to identify the mice that followed other animals in non-random fashions. Approximately half of the mice displayed at least one interaction of this type. We have not yet found a clear correlation between imitative behavior and relative alcohol preference. In conclusion, the model we describe avoids the limitations associated with testing isolated animals and reliably leads to stable alcohol drinking. Therefore, this model may be well suited to screening for the effects of genetic mutations or pharmacological treatments on alcohol-induced behaviors.

  13. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  14. The compressed work week as organizational change: behavioral and attitudinal outcomes.

    Science.gov (United States)

    Ronen, S; Primps, S B

    1981-01-01

    The results from recent studies on the compressed work week have been compiled and categorized in order to provide some basis for generalizing the effects of the work schedule on employee attitudes and behavior. It appears that attitudes toward the compressed week are favorable, with some generalization to job attitudes. Performance outcomes are ambiguous, although there are no reported decreases; fatigue seems to be the only negative aspect of the longer day. An examination of mediating variables suggests more complex relationships between the implementation of the compressed work week and potential outcomes. These relationships are described and directions are indicated for future research.

  15. Comparative study of heuristics algorithms in solving flexible job shop scheduling problem with condition based maintenance

    Directory of Open Access Journals (Sweden)

    Yahong Zheng

    2014-05-01

    Full Text Available Purpose: This paper focuses on a classic optimization problem in operations research, the flexible job shop scheduling problem (FJSP, to discuss the method to deal with uncertainty in a manufacturing system.Design/methodology/approach: In this paper, condition based maintenance (CBM, a kind of preventive maintenance, is suggested to reduce unavailability of machines. Different to the simultaneous scheduling algorithm (SSA used in the previous article (Neale & Cameron,1979, an inserting algorithm (IA is applied, in which firstly a pre-schedule is obtained through heuristic algorithm and then maintenance tasks are inserted into the pre-schedule scheme.Findings: It is encouraging that a new better solution for an instance in benchmark of FJSP is obtained in this research. Moreover, factually SSA used in literature for solving normal FJSPPM (FJSP with PM is not suitable for the dynamic FJSPPM. Through application in the benchmark of normal FJSPPM, it is found that although IA obtains inferior results compared to SSA used in literature, it performs much better in executing speed.Originality/value: Different to traditional scheduling of FJSP, uncertainty of machines is taken into account, which increases the complexity of the problem. An inserting algorithm (IA is proposed to solve the dynamic scheduling problem. It is stated that the quality of the final result depends much on the quality of the pre-schedule obtained during the procedure of solving a normal FJSP. In order to find the best solution of FJSP, a comparative study of three heuristics is carried out, the integrated GA, ACO and ABC. In the comparative study, we find that GA performs best in the three heuristic algorithms. Meanwhile, a new better solution for an instance in benchmark of FJSP is obtained in this research.

  16. Using the principles of circadian physiology enhances shift schedule design

    International Nuclear Information System (INIS)

    Connolly, J.J.; Moore-Ede, M.C.

    1987-01-01

    Nuclear power plants must operate 24 h, 7 days a week. For the most part, shift schedules currently in use at nuclear power plants have been designed to meet operational needs without considering the biological clocks of the human operators. The development of schedules that also take circadian principles into account is a positive step that can be taken to improve plant safety by optimizing operator alertness. These schedules reduce the probability of human errors especially during backshifts. In addition, training programs that teach round-the-clock workers how to deal with the problems of shiftwork can help to optimize performance and alertness. These programs teach shiftworkers the underlying causes of the sleep problems associated with shiftwork and also provide coping strategies for improving sleep and dealing with the transition between shifts. When these training programs are coupled with an improved schedule, the problems associated with working round-the-clock can be significantly reduced

  17. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    -down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable....... The result is a chaotic, complex and uncontrolled construction site. Furthermore, strict time limits entail the workflow to be optimized under non-optimal conditions. Even though productivity seems to be increasing, productivity per man-hour is decreasing resulting in increased cost. To increase productivity...

  18. Evaluation of distributed practice schedules on retention of a newly acquired surgical skill: a randomized trial.

    Science.gov (United States)

    Mitchell, Erica L; Lee, Dae Y; Sevdalis, Nick; Partsafas, Aaron W; Landry, Gregory J; Liem, Timothy K; Moneta, Gregory L

    2011-01-01

    practice influences new skill acquisition. The aim of this study was to prospectively investigate the impact of practice distribution (weekly vs monthly) on complex motor skill (end-side vascular anastomosis) acquisition and 4-month retention. twenty-four surgical interns were randomly assigned to weekly training for 4 weeks or monthly training for 4 months, with equal total training times. Performance was assessed before training, immediately after training, after the completion of distributed training, and 4 months later. there was no statistical difference in surgical skill acquisition and retention between the weekly and monthly scheduled groups, as measured by procedural checklist scores, global rating scores of operative performance, final product analysis, and overall performance or assessment of operative "competence." distributed practice results in improvement and retention of a newly acquired surgical skill independent of weekly or monthly practice schedules. Flexibility in a surgical skills laboratory curriculum is possible without adversely affecting training. 2011 Elsevier Inc. All rights reserved.

  19. Anesthesiology Nurse Scheduling using Particle Swarm Optimization

    Directory of Open Access Journals (Sweden)

    Leopoldo Altamirano

    2012-02-01

    Full Text Available In this article we present an approach designed to solve a real world problem: the Anesthesiology Nurse Scheduling Problem (ANSP at a public French hospital. The anesthesiology nurses are one of the most shared resources in the hospital and we attempt to find a fair/balanced schedule for them, taking into account a set of constraints and the nursesarsquo; stated preferences, concerning the different shifts. We propose a particle swarm optimization algorithm to solve the ANSP. Finally, we compare our technique with previous results obtained using integer programming.

  20. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  1. The Rathus Assertiveness Schedule: Reliability at the Junior High School Level

    Science.gov (United States)

    Vaal, Joseph J.; McCullagh, James

    1977-01-01

    This research was an attempt to determine the usefullness of the Rathus Assertiveness Schedule with pre-adolescent and early adolescent students. Previously it has been used with outpatients, institutionalized adults, or with college students. The RAS is a thirty item schedule that was developed for measuring assertiveness. (Author/RK)

  2. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  3. The Reinforcing Effects of Houselight Illumination during Chained Schedules of Food Presentation

    Science.gov (United States)

    Allen, Ron; Kupfer, Jeff; Malagodi, E. F.

    2008-01-01

    Pigeons' keypecking was maintained under two- and three-component chained schedules of food presentation. The component schedules were all fixed-interval schedules of either 1- or 2-min duration. Across conditions the presence of houselight illumination within each component schedule was manipulated. For each pigeon, first-component response rates…

  4. Comparison of two-dose priming plus 9-month booster with a standard three-dose priming schedule for a ten-valent pneumococcal conjugate vaccine in Nepalese infants: a randomised, controlled, open-label, non-inferiority trial.

    Science.gov (United States)

    Hamaluba, Mainga; Kandasamy, Rama; Upreti, Shyam R; Subedi, Giri R; Shrestha, Shrijana; Bhattarai, Shiva; Gurung, Meeru; Pradhan, Rahul; Voysey, Merryn; Gurung, Santosh; Pradhan, Shachi; Thapa, Anushil K; Maharjan, Rakesh; Kiran, Usha; Kerridge, Simon A; Hinds, Jason; van der Klis, Fiona; Snape, Matthew D; Murdoch, David R; Kelly, Sarah; Kelly, Dominic F; Adhikari, Neelam; Thorson, Stephen; Pollard, Andrew J

    2015-04-01

    Use of pneumococcal conjugate vaccines (PCVs) in resource-poor countries has focused on early infant immunisation with little emphasis on protection in late infancy and beyond. Boosting of the immune response later in infancy might provide improved persistence of immunogenicity into early childhood, however data are scarce. The aim of this study was to investigate if a two-dose prime with booster at age 9 months compared with a three-dose prime-only PCV schedule provided non-inferior immunogenicity in early infancy and superior persistence of antibody responses in early childhood. We did an open-label, randomised, parallel group, controlled trial in healthy infants aged 40-60 days from Kathmandu, Nepal. Participants were randomly allocated (4:4:5 ratio) to receive PCV10 in addition to routine immunisations either as a two-dose prime and boost (2+1), three-dose prime (3+0), or two doses after completion of the initial study phase (0+2). We used a computer generated randomisation list with randomly varying block sizes. We followed up participants at age 2-4 years together with a group of unvaccinated controls. Sera were analysed for opsonophagocytic activity, protein D, and PCV10 serotype-specific IgG. Laboratory staff was masked to intervention group assignment. The primary outcome measure was to determine the proportion of participants in the 2+1 group at age 10 months with specific IgG for serotypes 1, 5, and 14 of at least 0·2 μg/mL in the per-protocol population. The secondary outcomes were non-inferiority (within 10% levels) at age 18 weeks for the proportion of participants in the 2+1 group compared with the 3+0 group with serotypes 1, 5, and 14 specific IgG of at least 0·2 μg/mL; the proportion of participants with PCV10 serotype-specific IgG of at least 0·2 μg/mL and opsonophagocytic activity reciprocal titre of at least 8 at ages 18 weeks and 10 months; and nasopharyngeal pneumococcal serotype-specific carriage rates at age 9 months in each study

  5. A Comparison of Software Schedule Estimators

    Science.gov (United States)

    1990-09-01

    SLIM ...................................... 33 SPQR /20 ................................... 35 System -4 .................................... 37 Previous...24 3. PRICE-S Outputs ..................................... 26 4. COCOMO Factors by Category ........................... 28 5. SPQR /20 Activities...actual schedules experienced on the projects. The models analyzed were REVIC, PRICE-S, System-4, SPQR /20, and SEER. ix A COMPARISON OF SOFTWARE

  6. 42. Science week: Laser Science and applications, Aleppo (SY), 2-4 Nov 2002, Book three: Laser applications

    International Nuclear Information System (INIS)

    2005-01-01

    This publication includes the papers presented at the 42nd science week of the Supreme Council of Sciences, held in Aleppo (Syria) from 2-4 November 2002. This proceedings is published in three books covering laser science and applications and in particular on material studies and medical uses. Part two covers medical applications, Part three on applications of laser in material sciences, while Part one is for contents and the proceedings program

  7. The application of artificial intelligence to astronomical scheduling problems

    Science.gov (United States)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike

  8. Do pregnant women prefer timing of elective cesarean section prior to versus after 39 weeks of gestation? Secondary analyses from a randomized controlled trial.

    Science.gov (United States)

    Glavind, J; Henriksen, T B; Kindberg, S F; Uldbjerg, N

    2014-11-01

    To evaluate women's preferences for timing of elective cesarean section (ECS) scheduled prior to versus after 39 completed weeks. Secondary analyses from a randomized controlled open-label trial were conducted at seven Danish tertiary hospitals from March 2009 to June 2011 with inclusion of singleton pregnant women with a healthy fetus. The women were allocated by a computerized telephone system to ECS scheduled at 38(+3) weeks or 39(+3) weeks of gestation. Dissatisfaction with timing of ECS and preferred timing of the procedure in a proposed future ECS delivery were evaluated. Data analyses were done by intention-to-treat, using logistic regression. A total of 1196 women (94%) completed an online questionnaire at follow-up eight weeks postpartum. In the 38 weeks group, 61 (10%) women 601 were dissatisfied with the timing of their ECS, whereas in the 39 weeks group 157 (26%) of 595 were dissatisfied (adjOR 3.18, 95% CI 2.30; 4.40). The proportion of women who preferred the same timing in a future ECS were 272 (45%) in the 38 weeks group compared to 232 (39%) in the 39(+3) weeks group (adjOR 0.75, 95% CI 0.60; 0.95). The women in this trial preferred ECS scheduled prior to 39 weeks of gestation.

  9. An Automatic Course Scheduling Approach Using Instructors' Preferences

    Directory of Open Access Journals (Sweden)

    Hossam Faris

    2012-03-01

    Full Text Available University Courses Timetabling problem has been extensively researched in the last decade. Therefore, numerous approaches were proposed to solve UCT problem. This paper proposes a new approach to process a sequence of meetings between instructors, rooms, and students in predefined periods of time with satisfying a set of constraints divided in variety of types. In addition, this paper proposes new representation for courses timetabling and conflict-free for each time slot by mining instructor preferences from previous schedules to avoid undesirable times for instructors. Experiments on different real data showed the approach achieved increased satisfaction degree for each instructor and gives feasible schedule with satisfying all hard constraints in construction operation. The generated schedules have high satisfaction degrees comparing with schedules created manually. The research conducts experiments on collected data gathered from the computer science department and other related departments in Jordan University of Science and Technology- Jordan.

  10. The amphetamine sensitization model of schizophrenia symptoms and its effect on schedule-induced polydipsia in the rat.

    Science.gov (United States)

    Hawken, Emily R; Beninger, Richard J

    2014-05-01

    Amphetamine enhances dopamine (DA) transmission and induces psychotic states or exacerbates psychosis in at-risk individuals. Amphetamine sensitization of the DA system has been proposed as a rodent model of schizophrenia-like symptoms. In humans, excessive nonphysiologic drinking or primary polydipsia is significantly associated with a diagnosis of schizophrenia. In rodents, nonphysiologic drinking can be induced by intermittent presentation of food in the presence of a drinking spout to a hungry animal; this phenomenon is termed, "schedule-induced polydipsia" (SIP). This study aims to determine the effects of amphetamine sensitization on SIP. We injected rats with amphetamine (1.5 mg/kg) daily for 5 days. Following 4 weeks of withdrawal, animals were food restricted and exposed to the SIP protocol (noncontingent fixed-time 1-min food schedule) for daily 2-h sessions for 24 days. Results showed that previously amphetamine-injected animals drank more in the SIP protocol and drank more than controls when the intermittent food presentation schedule was removed. These findings suggest that hyperdopaminergia associated with schizophrenia may contribute to the development of polydipsia in this population. Whether animals that develop SIP have DA dysfunction or aberrant activity of other circuits that modulate DA activity has yet to be clearly defined.

  11. Shift scheduling limits for the nuclear industry NRC policy and recommendations

    International Nuclear Information System (INIS)

    Koontz, J.; Morisseau, D.; Lewis, P.

    1985-01-01

    A study on shift scheduling and use of overtime and their effects on human performance in nuclear and non-nuclear industries was conducted. An analysis of the literature, current practices, and federal policy on shift scheduling resulted in human factors recommendations for limiting hours of work in the nuclear industry for nuclear power plant personnel conducting safety related functions. Recommended limits on total hours of work were developed by a panel of experts for both 8-hour and 12-hour daily shift schedules for weekly, biweekly, monthly, and annual work periods. The study results are particularly applicable to control room operators but should also be considered for other personnel where performance degradation due to fatigue could directly affect safe plant operations

  12. Partnering for a greener community, Virginia Tech, the Town of Blacksburg, and Sustainable Blacksburg present Sustainability Week 2008

    OpenAIRE

    Harris, Jennifer

    2008-01-01

    Virginia Tech, the Town of Blacksburg and Sustainable Blacksburg have partnered to present Sustainability Week 2008, Oct. 20 through 25. During Sustainability Week more than 20 activities, events and tours, focused on building and sustaining a greener community, have been scheduled.

  13. Depressed mood in the working population: associations with work schedules and working hours.

    Science.gov (United States)

    Driesen, Karolien; Jansen, Nicole W H; Kant, Ijmert; Mohren, Danielle C L; van Amelsvoort, Ludovic G P M

    2010-07-01

    The impact of working time arrangements (WTA) on health has been studied extensively. Still, little is known about the interrelation between work schedules, working hours, and depressed mood. For work schedules, the underlying assumptions regarding depressed mood refer to a disturbance of social and biological rhythms, whereas for working hours, the assumptions relate to workload and work capacity. Conversely, depressed mood may urge an employee to adjust his/her work schedule and/or number of working hours/week (h/wk). The aim of this study was to assess the association between work schedule and working hours with depressed mood. Using baseline data from the Maastricht Cohort Study, depressed mood in day work was compared with depressed mood in different shiftwork schedules (n = 8843). Within day work, several categories of working h/wk were studied in association with depressed mood (n = 7217). The association between depressed mood and several aspects of overtime was assessed separately. Depressed mood was measured with a dichotomous item: "Did you feel down every day over the last two weeks?" Separate logistic regression analyses were conducted for men and women, with adjustments for potential confounders. The odds ratio (OR) for depressed mood was greater for men involved in shiftwork than for men only involved in day work (three-shift OR = 2.05 [95% confidence interval, CI 1.52-2.77]; five-shift OR = 1.34 [95% CI 1.00-1.80]; irregular-shift OR = 1.79 [95% CI 1.27-2.53]). In female employees, five-shift work was associated with a higher prevalence of depressed mood (OR = 5.96 [95% CI 2.83-12.56]). Regarding the number of working h/wk, men working working 36-40 h/wk (OR = 2.73 [95% CI 1.35-5.52]). After conducting trend analyses, a significant decreasing trend was found in men, whereas an increasing trend was found in women working a high number of hours. Furthermore, a dose-response relationship was present in men regarding the number of overtime h/wk. This

  14. Study protocol: non-displaced distal radial fractures in adult patients: three weeks vs. five weeks of cast immobilization: a randomized trial.

    Science.gov (United States)

    Bentohami, Abdelali; de Korte, Niels; Sosef, Nico; Goslings, Johan Carel; Bijlsma, Taco; Schep, Niels

    2014-01-20

    Up to 30% of patients suffer from long-term functional restrictions following conservative treatment of distal radius fractures. Whether duration of cast immobilisation influences functional outcome remains unclear. The aim of the study is to evaluate whether the duration of immobilization of non or minimally displaced distal radial fractures can be safely reduced. We will compare three weeks of plaster cast immobilization with five weeks of plaster cast immobilization in adult patient with non or minimally displaced distal radial fractures. a prospective randomized clinical trial. adult (>18 years) (independent in activities of daily living) patients with a non/minimal displaced distal radius fracture (dorsal angulation 15°, ulnar positive variance immobilization versus five weeks of plaster cast immobilization.Main study parameters: primary outcome parameters: Patient related wrist evaluation (PRWE) Quick Disability of Arm, Shoulder and Hand (QUICKDASH) score after a one year follow-up, and secondary parameters: range of motion, pain level (VAS) and complications. The expectation of this study is that shorter duration of plaster cast immobilisation is beneficial for the patient with a distal radius fracture. This risk of specific complications is low and generally similar in both treatment options. Moreover, the burden of the study is not much higher compared to standard treatment. Follow-up is standardized according to current trauma guidelines. Literature indicates that both treatment options from the study are accepted for displaced distal radius fractures. No clear advantage for one treatment options is found at present in the literature, although there is no level I evidence present. This trial will provide level-1 evidence for the comparison of consolidation and functional outcome between two treatment options for non-displaced distal radial fractures. The gathered data may support the development of a clinical guideline for conservative treatment of

  15. A distributed scheduling algorithm for heterogeneous real-time systems

    Science.gov (United States)

    Zeineldine, Osman; El-Toweissy, Mohamed; Mukkamala, Ravi

    1991-01-01

    Much of the previous work on load balancing and scheduling in distributed environments was concerned with homogeneous systems and homogeneous loads. Several of the results indicated that random policies are as effective as other more complex load allocation policies. The effects of heterogeneity on scheduling algorithms for hard real time systems is examined. A distributed scheduler specifically to handle heterogeneities in both nodes and node traffic is proposed. The performance of the algorithm is measured in terms of the percentage of jobs discarded. While a random task allocation is very sensitive to heterogeneities, the algorithm is shown to be robust to such non-uniformities in system components and load.

  16. The influence of intermittent fasting on the circadian pattern of melatonin while controlling for caloric intake, energy expenditure, light exposure, and sleep schedules: A preliminary report.

    Science.gov (United States)

    Almeneessier, Aljohara S; Bahammam, Ahmed S; Sharif, Munir M; Bahammam, Salman A; Nashwan, Samar Z; Pandi Perumal, Seithikurippu R; Cardinali, Daniel P; Alzoghaibi, Mohammad

    2017-01-01

    We hypothesized that if we control for food composition, caloric intake, light exposure, sleep schedule, and exercise, intermittent fasting would not influence the circadian pattern of melatonin. Therefore, we designed this study to assess the effect of intermittent fasting on the circadian pattern of melatonin. Eight healthy volunteers with a mean age of 26.6 ± 4.9 years and body mass index of 23.7 ± 3.5 kg/m 2 reported to the Sleep Disorders Center (the laboratory) on four occasions: (1) adaptation, (2) 4 weeks before Ramadan while performing Islamic intermittent fasting for 1 week (fasting outside Ramadan [FOR]), (3) 1 week before Ramadan (nonfasting baseline [BL]), and (4) during the 2 nd week of Ramadan while fasting ( Ramadan ). The plasma levels of melatonin were measured using enzyme-linked immunoassays at 22:00, 02:00, 04:00, 06:00, and 11:00 h. The light exposure, meal composition, energy expenditure, and sleep schedules remained the same while the participants stayed at the laboratory. The melatonin levels followed the same circadian pattern during the three monitoring periods (BL, FOR, and Ramadan ). The peak melatonin level was at 02:00 h and the trough level was at 11:00 h in all studied periods. Lower melatonin levels at 22:00 h were found during fasting compared to BL. Cosinor analysis revealed no significant changes in the acrophase of melatonin levels. In this preliminary report, under controlled conditions of light exposure, meal composition, energy expenditure, and sleep-wake schedules, intermittent fasting has no significant influence on the circadian pattern of melatonin.

  17. Staff Perspectives of the Four-Day School Week: A New Analysis of Compressed School Schedules

    Science.gov (United States)

    Turner, Jon Scott; Finch, Kim; Ximena, Uribe-Zarian

    2018-01-01

    The four-day school week is a concept that has been utilized in rural schools for decades to respond to budgetary shortfalls. There has been little peer-reviewed research on the four-day school week that has focused on the perception of staff that work in school districts that have recently switched to the four-day model. This study collects data…

  18. Effects of weekly feeding frequency and previous ration restriction on the compensatory growth and body composition of Nile tilapia fingerlings

    OpenAIRE

    EL SAYED ALY HASSAN, TAMER; Martínez Llorens, Silvia; Moñino López, Andrés Vicente; Jover Cerdá, Miguel; Tomás Vidal, Ana

    2016-01-01

    [EN] The effect of different weekly feeding frequencies on Nile tilapia fingerlings of 2.02 g, was determined during 12 weeks. This was done by feeding the fish 7 days/week, 6 days/week or 5 days/week. After this restriction feeding period, all fish were fed as the control group (7 days/week) during 26 days to study the capability of the fish to compensate the growth during this re-feeding period. At the end of the feeding restriction period, there were significant differences in weights amon...

  19. Time-dependent enhancement of lymphocyte activation by mitogens after exposure to isolation or water scheduling.

    Science.gov (United States)

    Jessop, J J; Gale, K; Bayer, B M

    1988-01-01

    The effects of isolation and water scheduling on mitogen induced lymphocyte proliferation were investigated. Isolated rats were animals which had been raised in group-housed conditions and then transferred to individual cages with ad lib access to water for a 1 or 2 week period. Water scheduled rats were maintained in group housing (5 rats per cage) with ad lib access to food but with access to water for a single 30 minute session each day. Responses of these groups were compared to those of animals which had been continuously group-housed with ad lib access to food and water. No differences in lymphocyte responses to phytohemagglutinin (PHA) were found 1 week after exposure to isolation. However, after 2 weeks, splenic and blood T lymphocytes from isolated animals demonstrated an increased proliferative response to suboptimum and maximum concentrations of PHA. Splenic B lymphocyte responses to lipopolysaccharide (LPS) from isolated animals were also increased by 2- to 3-fold compared to group-housed controls. Two weeks of exposure of animals to daily water scheduling similarly increased the splenic lymphocyte proliferation. This increased responsiveness to PHA was not accompanied by a significant change in the sensitivity of the lymphocytes to PHA, in the total number of white blood cells, or the proportion of splenic T or T helper lymphocytes. Our results show that the increase in lymphocyte proliferation is time-dependent, requires greater than 1 week of exposure to isolation and is due to factors other than changes in sensitivity to mitogen or T lymphocyte number.

  20. An Improved Recovery Algorithm for Decayed AES Key Schedule Images

    Science.gov (United States)

    Tsow, Alex

    A practical algorithm that recovers AES key schedules from decayed memory images is presented. Halderman et al. [1] established this recovery capability, dubbed the cold-boot attack, as a serious vulnerability for several widespread software-based encryption packages. Our algorithm recovers AES-128 key schedules tens of millions of times faster than the original proof-of-concept release. In practice, it enables reliable recovery of key schedules at 70% decay, well over twice the decay capacity of previous methods. The algorithm is generalized to AES-256 and is empirically shown to recover 256-bit key schedules that have suffered 65% decay. When solutions are unique, the algorithm efficiently validates this property and outputs the solution for memory images decayed up to 60%.

  1. Radioimmunotherapy with Y-90-epratuzumab in patients with previously treated B-cell lymphoma. A fractionated dose-escalation study

    International Nuclear Information System (INIS)

    Linden, O.; Cavallin-Stahl, E.; Tennvall, J.; Hindorf, C.; Olsson, T.; Strand, S.E.; Stenberg, L.; Wingardh, K.

    2002-01-01

    Aim: Fractionated RIT may improve outcome by decreasing heterogeneity in absorbed dose and by increasing therapeutic window. The humanised anti-CD22 antibody, Epratuzumab, (Immunomedics, Inc., Morris Plains, NJ) can be given repeatedly with minimal risk of neutralising Ab (HAHA), making fractionated treatment with 90 Y-labelled epratuzumab possible. Materials and Methods: Patients with previously treated B-cell lymphoma received increasing number (2-4) of weekly infusions of 90 Y-epratuzumab. Patients received either 185 MBq/m 2 per infusion (group A), or, if they had a history of high-dose chemotherapy with stem-cell rescue, 92.5 MBq/m 2 per infusion (group B). The first infusion included 150 MBq of 111 Indium for scintigraphic verification of tumour targeting and dosimetry. 1.5 mg/kg epratuzumab was administered with each infusion. The treatment could be repeated once after 3 m. Results: Of 23 patients, 16 in group A and 6 in group B were evaluable for response. The RR in group A was 62% objective response (OR) and 25% CR/CRu. One patient in group B showed OR. OR was seen in aggressive and indolent lymphoma. Response was also long-lasting and event-free survival of patients showing CR/CRu was 14 to 25+ months. In group A all seven patient, receiving three infusions, showed less than grade 3 platelet and neutrophil toxicity, except for two patients suffering grade 3 neutropenia. Of five patients with 4 weekly infusions there were two patients with dose-limiting haematological toxicity (DLT), both recently treated with high dose cytosar before RIT. With criteria used the maximal tolerated dose was three infusions 185 MBq/m 2 . In group B no patient suffered DLT and one patient exhibited OR. Seven patients were retreated after 3 months with minor toxicity, but improvement in OR in two cases. No patient has developed HAHA. CD22 expression on tumour cells, as assessed by flow cytometry, is available in 18 of 22 patients. In group A, seven of eight patients with

  2. Timing analysis for embedded systems using non-preemptive EDF scheduling under bounded error arrivals

    Directory of Open Access Journals (Sweden)

    Michael Short

    2017-07-01

    Full Text Available Embedded systems consist of one or more processing units which are completely encapsulated by the devices under their control, and they often have stringent timing constraints associated with their functional specification. Previous research has considered the performance of different types of task scheduling algorithm and developed associated timing analysis techniques for such systems. Although preemptive scheduling techniques have traditionally been favored, rapid increases in processor speeds combined with improved insights into the behavior of non-preemptive scheduling techniques have seen an increased interest in their use for real-time applications such as multimedia, automation and control. However when non-preemptive scheduling techniques are employed there is a potential lack of error confinement should any timing errors occur in individual software tasks. In this paper, the focus is upon adding fault tolerance in systems using non-preemptive deadline-driven scheduling. Schedulability conditions are derived for fault-tolerant periodic and sporadic task sets experiencing bounded error arrivals under non-preemptive deadline scheduling. A timing analysis algorithm is presented based upon these conditions and its run-time properties are studied. Computational experiments show it to be highly efficient in terms of run-time complexity and competitive ratio when compared to previous approaches.

  3. Improved human performance through appropriate work scheduling

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Lewis, P.M.; Persensky, J.J.

    1987-01-01

    The Nuclear Regulatory Commission (NRC) has had a policy, Generic Letter 82-12, on hours of work since 1982. The policy states that licensees should establish controls to prevent situations where fatigue could reduce the ability of operating personnel to perform their duties safely (USNRC 1982). While that policy does give guidance on hours of work and overtime, it does not address periods of longer than 7 days or work schedules other than the routine 8-hour day, 40-hour week. Recognizing that NRC policy could provide broader guidance for shift schedules and hours of overtime work, the Division of Human Factors Safety conducted a project with Pacific Northwest Laboratories (PNL) to help the NRC better understand the human factors principles and issues concerning hours of work so that the NRC could consider updating their policy as necessary. The results of this project are recommendations for guidelines and limits for periods of 14 days, 28 days, and 1 year to take into account the cumulative effects of fatigue. In addition, routine 12-hour shifts are addressed. This latter type of shift schedule has been widely adopted in the petroleum and chemical industries and several utilities operating nuclear power plants have adopted it as well. Since this is the case, it is important to consider including guidelines for implementing this type of schedule. This paper discusses the bases for the PNL recommendations which are currently being studied by the NRC

  4. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  5. COLLABORATION BOARD (CB59), 29/02/08

    CERN Multimedia

    CMS Week in Cyprus (P. Razis) P. Razis outlined the plans in Cyprus. A web page would be posted the following week and early registration would be requested by around the end of March. CMS Calendar/Election Schedule (Q. Ingram) The proposal to have only three CMS Weeks per year with two additional Collaboration Board meetings at the end of Physics Weeks had been made in December. An indicative calendar for 2009 was shown to illustrate a possible rhythm of meetings, with CMS Weeks in February, June, and November. The Collaboration Board agreed to the proposal. A modified, shortened schedule for the election of the Spokesperson and of the Collaboration Board Chair was proposed, as well as moving the election itself to the first CMS Week of the year. The Collaboration Board approved the proposed outline election schedule. Constitution Update (L. Foa) The final parts of the 2007 revision of the Constitution had been circulated. These concerned (in addition to Annex 2d addressed in the previous item) Section 2....

  6. Effects of weekly feeding frequency and previous ration restriction on the compensatory growth and body composition of Nile tilapia fingerlings

    Directory of Open Access Journals (Sweden)

    Tamer El Sayed Ali

    2016-09-01

    Full Text Available The effect of different weekly feeding frequencies on Nile tilapia fingerlings of 2.02 g, was determined during 12 weeks. This was done by feeding the fish 7 days/week, 6 days/week or 5 days/week. After this restriction feeding period, all fish were fed as the control group (7 days/week during 26 days to study the capability of the fish to compensate the growth during this re-feeding period. At the end of the feeding restriction period, there were significant differences in weights among the different treatments, although the significance was detected only at 7 days/week level, which presented the highest final body weight compared with the other 2 treatments. The daily feed intake and the feed conversion and protein efficiency ratios did not present significant differences. Crude protein efficiency (CPE and gross energy efficiency (GEE were affected by the feeding frequency, presenting high values in fish fed 7 days/week. Growth results obtained during this re-feeding period indicate that weight gain (WG and specific growth rate (SGR presented a linear increase from 7 to 5 days/week, i.e. with increasing feed deprivation period the fish could compensate the growth effectively, trying to reach to the weight as those of the control group.

  7. Exclusive Preference Develops Less Readily on Concurrent Ratio Schedules with Wheel-Running than with Sucrose Reinforcement

    Science.gov (United States)

    Belke, Terry W.

    2010-01-01

    Previous research suggested that allocation of responses on concurrent schedules of wheel-running reinforcement was less sensitive to schedule differences than typically observed with more conventional reinforcers. To assess this possibility, 16 female Long Evans rats were exposed to concurrent FR FR schedules of reinforcement and the schedule…

  8. Immunogenicity and safety of different injection routes and schedules of IC41, a Hepatitis C virus (HCV) peptide vaccine.

    Science.gov (United States)

    Firbas, Christa; Boehm, Thomas; Buerger, Vera; Schuller, Elisabeth; Sabarth, Nicolas; Jilma, Bernd; Klade, Christoph S

    2010-03-11

    An effective vaccine would be a significant progress in the management of chronic HCV infections. This study was designed to examine whether different application schedules and injection routes may enhance the immunogenicity of the HCV peptide vaccine IC41. In this randomized trial 54 healthy subjects received either subcutaneous (s.c.) or intradermal (i.d.) vaccinations weekly (16 injections) or every other week (8 injections). One group additionally received imiquimod, an activator of the toll-like receptor (TLR) 7. The T cell epitope-specific immune response to IC41 was assessed using [(3)H]-thymidine CD4+ T cell proliferation, interferon-gamma (IFN-gamma) CD8+ and CD4+ ELIspot and HLA-A*0201 fluorescence-activated cell sorting (FACS) tetramer-binding assays. More than 60% of vaccinees responded in the CD4+ T cell proliferation assay in all groups. An HLA-A*0201 FACS tetramer-binding assay and IFN-gamma CD8+ ELIspot class I response of more than 70% was induced in four and three groups, respectively. IC41 induced significant immunological responses in all groups with responder rates of up to 100%. Interestingly, topical imiquimod was not able to enhance immunogenicity but was associated with a lower immune response. Local injection site reactions were mostly transient. Intradermal injections caused more pronounced reactions compared to s.c., especially erythema and edema. Compared to a previous study intensified dosing and/or i.d. injections enhanced the response rates to the vaccine IC41 in three assays measuring T cell function. Immunization with IC41 was generally safe in this study. These results justify testing IC41 in further clinical trials with HCV-infected individuals.

  9. Parental work schedules and child overweight and obesity.

    Science.gov (United States)

    Champion, S L; Rumbold, A R; Steele, E J; Giles, L C; Davies, M J; Moore, V M

    2012-04-01

    Studies in school-age children have consistently shown a positive association between maternal paid work hours and child obesity. However, there is conflicting evidence about the impact of maternal work hours scheduled at nonstandard times (for example, evenings, nights or weekends), and no previous examination of paternal work schedules and child weight. We examined the associations between maternal, paternal and combined parental paid work schedules and overweight/obesity in children at age 9 years. Data were analysed from the most recent follow-up of 9-year-old children (n=434) in an Australian birth cohort study. Children were measured and classified as overweight/obese using the International Obesity Taskforce body mass index cutoff points. Current working conditions of parents were obtained from a structured interview with the primary caregiver. Logistic regression analyses were used to investigate the effect of parental work schedules on child overweight/obesity with adjustment for a range of sociodemographic and household factors associated with parental employment and child weight. At 9 years of age, 99 children (22.8%) were overweight or obese. When parental work schedules were examined separately, child overweight/obesity was significantly associated with paternal nonstandard work schedules (adjusted odds ratio (OR) 1.97, 95% confidence interval (CI) 1.08-3.61). There was no association with any type of maternal work schedule. We also found an association between child overweight/obesity and circumstances in which both parents worked nonstandard schedules; however, this was of borderline statistical significance in the adjusted models (adjusted OR 2.26, 95% CI 0.99-5.16). Work hours scheduled at nonstandard times, when worked by the father or both parents, were associated with child overweight and obesity. These findings indicate the potential importance of fathers' paid work arrangements for child overweight/obesity, which until recently has largely

  10. Optimal Intermittent Dose Schedules for Chemotherapy Using Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Nadia ALAM

    2013-08-01

    Full Text Available In this paper, a design method for optimal cancer chemotherapy schedules via genetic algorithm (GA is presented. The design targets the key objective of chemotherapy to minimize the size of cancer tumor after a predefined time with keeping toxic side effects in limit. This is a difficult target to achieve using conventional clinical methods due to poor therapeutic indices of existing anti-cancer drugs. Moreover, there are clinical limitations in treatment administration to maintain continuous treatment. Besides, carefully decided rest periods are recommended to for patient’s comfort. Three intermittent drug scheduling schemes are presented in this paper where GA is used to optimize the dose quantities and timings by satisfying several treatment constraints. All three schemes are found to be effective in total elimination of cancer tumor after an agreed treatment length. The number of cancer cells is found zero at the end of the treatment for all three cases with tolerable toxicity. Finally, two of the schemes, “Fixed interval variable dose (FIVD and “Periodic dose” that are periodic in characteristic have been emphasized due to their additional simplicity in administration along with friendliness to patients. responses to the designed treatment schedules. Therefore the proposed design method is capable of planning effective, simple, patient friendly and acceptable chemotherapy schedules.

  11. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  12. Effects of Low Versus Moderate Glycemic Index Diets on Aerobic Capacity in Endurance Runners: Three-Week Randomized Controlled Crossover Trial

    Directory of Open Access Journals (Sweden)

    Krzysztof Durkalec-Michalski

    2018-03-01

    Full Text Available The glycemic index (GI of ingested carbohydrates may influence substrate oxidation during exercise and athletic performance. Therefore, the aim of this study was to assess the effect of low- and moderate-GI three-week diets on aerobic capacity and endurance performance in runners. We conducted a randomized crossover feeding study of matched diets differing only in GI (low vs. moderate in 21 endurance-trained runners. Each participant consumed both, low- (LGI and moderate-GI (MGI high-carbohydrate (~60% and nutrient-balanced diets for three weeks each. At the beginning and end of each diet, participants had their aerobic capacity and body composition measured and performed a 12-min running test. After LGI, time to exhaustion during incremental cycling test (ICT and distance covered in the 12-min run were significantly increased. The MGI diet led to an increase in maximal oxygen uptake ( V ˙ O2max, but no performance benefits were found after the MGI diet. The LGI and MGI diets improved time and workload at gas exchange threshold (GET during ICT. The results indicate that a three-week high-carbohydrate LGI diet resulted in a small but significant improvement in athletic performance in endurance runners. Observed increase in V ˙ O2max on MGI diet did not affect performance.

  13. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  14. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  15. Comparison of Acute and Late Toxicity of Two Regimens of 3- and 5-Week Concomitant Boost Prone IMRT to Standard 6-Week Breast Radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Raza, Shahzad; Lymberis, Stella C.; Ciervide, Raquel [Department of Radiation Oncology and Surgery, New York University School of Medicine, New York University Langone Medical Center, New York, NY (United States); Axelrod, Deborah [Department of Surgery, New York University School of Medicine, New York University Langone Medical Center, New York, NY (United States); Fenton-Kerimian, Maria; Magnolfi, Chiara; Rosenstein, Barry; DeWyngaert, J. Keith; Formenti, Silvia C., E-mail: silvia.formenti@nyumc.org [Department of Radiation Oncology and Surgery, New York University School of Medicine, New York University Langone Medical Center, New York, NY (United States)

    2012-05-08

    Purpose: Limited information is available comparing toxicity of accelerated radiotherapy (RT) to that of standard fractionation RT for early stage breast cancer. We report early and late toxicities of two prone regimens of accelerated intensity-modulated radiation therapy (IMRT) with a concomitant boost (CB) to the tumor bed delivered over 3 or 5 weeks as compared to standard 6 week RT with a sequential electron boost. Methods: From 2/2003 to 12/2007, 169 consecutive patients with Stage I–II breast cancer were offered the choice to undergo prone RT with either: a 6-week standard RT regimen of 46 Gy/23 fractions (fx) to the whole breast (WB), followed by a14 Gy sequential boost (SB) to the tumor bed (6wSB), a 5-week regimen of 50 Gy to WB with an IMRT CB of 6.25 Gy in 25 fx (5wCB); or a 3-week protocol of 40.5 Gy to WB with an IMRT CB of 7.5 Gy in 15 fx (3wCB). These regimens were estimated as biologically equivalent, based on alpha/beta = 4 for tumor control. Toxicities were reported using RTOG and LENT/SOMA scoring. Results: 51/169 patients chose standard 6wSB, 28 selected 5wCB, and 90 enrolled in 3wCB protocol. Maximum acute toxicity was Grade 3 dermatitis in 4% of the patients in the 6wSB compared 1% in 3wCB. In general, acute complications (breast pain, fatigue, and dermatitis) were significantly less in the 3wCB than in the other schedules (P < 0.05). With a median follow-up of 61 months, the only Grade 3 late toxicity was telangiectasia in two patients: one in 3wCB and one in 5wCB group. Notably, fibrosis was comparable among the three groups (P = NS). Conclusion: These preliminary data suggest that accelerated regimens of breast RT over 3 or 5 weeks in the prone position, with an IMRT tumor bed CB, result in comparable late toxicity to standard fractionation with a sequential tumor boost delivered over 6 weeks. As predicted by radiobiological modeling the shorter regimen was associated with less acute effects.

  16. Effects on quality of life of weekly docetaxel-based chemotherapy in patients with locally advanced or metastatic breast cancer: results of a single-centre randomized phase 3 trial

    Directory of Open Access Journals (Sweden)

    Rinaldo Massimo

    2011-02-01

    Full Text Available Abstract Background To evaluate whether weekly schedules of docetaxel-based chemotherapy were superior to 3-weekly ones in terms of quality of life in locally advanced or metastatic breast cancer. Methods Patients with locally advanced or metastatic breast cancer, aged ≤ 70 years, performance status 0-2, chemotherapy-naive for metastatic disease, were eligible. They were randomized to weekly or 3-weekly combination of docetaxel and epirubicin, if they were not treated with adjuvant anthracyclines, or docetaxel and capecitabine, if treated with adjuvant anthracyclines. Primary end-point was global quality of life change at 6-weeks, measured by EORTC QLQ-C30. With two-sided alpha 0.05 and 80% power for 35% effect size, 130 patients per arm were needed. Results From February 2004 to March 2008, 139 patients were randomized, 70 to weekly and 69 to 3-weekly arm; 129 and 89 patients filled baseline and 6-week questionnaires, respectively. Global quality of life was better in the 3-weekly arm (p = 0.03; patients treated with weekly schedules presented a significantly worsening in role functioning and financial scores (p = 0.02 and p Conclusions In this trial, the weekly schedules of docetaxel-based chemotherapy appear to be inferior to the 3-weekly one in terms of quality of life in patients with locally advanced or metastatic breast cancer. Trial registration ClinicalTrials.gov NCT00540800.

  17. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  18. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  19. Effect of reduced dose schedules and intramuscular injection of anthrax vaccine adsorbed on immunological response and safety profile: a randomized trial.

    Science.gov (United States)

    Wright, Jennifer G; Plikaytis, Brian D; Rose, Charles E; Parker, Scott D; Babcock, Janiine; Keitel, Wendy; El Sahly, Hana; Poland, Gregory A; Jacobson, Robert M; Keyserling, Harry L; Semenova, Vera A; Li, Han; Schiffer, Jarad; Dababneh, Hanan; Martin, Sandra K; Martin, Stacey W; Marano, Nina; Messonnier, Nancy E; Quinn, Conrad P

    2014-02-12

    We evaluated an alternative administration route, reduced schedule priming series, and increased intervals between booster doses for anthrax vaccine adsorbed (AVA). AVA's originally licensed schedule was 6 subcutaneous (SQ) priming injections administered at months (m) 0, 0.5, 1, 6, 12 and 18 with annual boosters; a simpler schedule is desired. Through a multicenter randomized, double blind, non-inferiority Phase IV human clinical trial, the originally licensed schedule was compared to four alternative and two placebo schedules. 8-SQ group participants received 6 SQ injections with m30 and m42 "annual" boosters; participants in the 8-IM group received intramuscular (IM) injections according to the same schedule. Reduced schedule groups (7-IM, 5-IM, 4-IM) received IM injections at m0, m1, m6; at least one of the m0.5, m12, m18, m30 vaccine doses were replaced with saline. All reduced schedule groups received a m42 booster. Post-injection blood draws were taken two to four weeks following injection. Non-inferiority of the alternative schedules was compared to the 8-SQ group at m2, m7, and m43. Reactogenicity outcomes were proportions of injection site and systemic adverse events (AEs). The 8-IM group's m2 response was non-inferior to the 8-SQ group for the three primary endpoints of anti-protective antigen IgG geometric mean concentration (GMC), geometric mean titer, and proportion of responders with a 4-fold rise in titer. At m7 anti-PA IgG GMCs for the three reduced dosage groups were non-inferior to the 8-SQ group GMCs. At m43, 8-IM, 5-IM, and 4-IM group GMCs were superior to the 8-SQ group. Solicited injection site AEs occurred at lower proportions in the IM group compared to SQ. Route of administration did not influence the occurrence of systemic AEs. A 3 dose IM priming schedule with doses administered at m0, m1, and m6 elicited long term immunological responses and robust immunological memory that was efficiently stimulated by a single booster vaccination at

  20. The accelerated hepatitis B virus vaccination schedule among hemodialysis patients, does it work? A randomized controlled trial.

    Science.gov (United States)

    Imam, Mahmoud Hamada

    2017-12-01

    Hemodialysis patients possess particular attributes which increase the susceptibility to hepatitis B virus (HBV) infections. HBV vaccination significantly decreased the number of new HBV-infected patients. However, the conventional vaccination schedule requires a 6-months duration. This study aimed to examine the efficacy the accelerated vaccination schedule among hemodialysis patients. In this study, 202 consecutive hemodialysis patients at New Jeddah hospital were enrolled. The inclusion criteria were: (1) age was above 18 years, (2) all patients had undetectable HBV surface antigen and antibody. Exclusion criteria included: (1) patient had a positive serum HBV surface antigen and antibody using enzyme-linked immunosorbent assay; (2) patient received a previous course of HBV vaccine, (3) patient who was pregnant. Patients were sequentially randomized to receive either Hepatitis B recombinant DNA vaccine (conventional schedule) or to receive combined hepatitis A and B vaccine injection (accelerated schedule). Testing for HBV surface antibodies was done one and three months after completion of the dosage schedule. The primary outcome was the proportion of seroprotection (defined by serum HBV surface antibodies ≥ 10 mIU/ml). Adverse reactions were evaluated regarding both fever and post-injection pain scale. Patients' age ranged from 18 to 71 years.After 1 and 3 months of completion of the vaccination schedule, there was no statistical difference in the proportion of seroprotected patients among both groups. Accelerated vaccination schedule using combined hepatitis A and B vaccine may be beneficial for HBV seroprotection among hemodialysis patients.

  1. Effects of reinforcer magnitude on responding under differential-reinforcement-of-low-rate schedules of rats and pigeons.

    Science.gov (United States)

    Doughty, Adam H; Richards, Jerry B

    2002-07-01

    Experiment I investigated the effects of reinforcer magnitude on differential-reinforcement-of-low-rate (DRL) schedule performance in three phases. In Phase 1, two groups of rats (n = 6 and 5) responded under a DRI. 72-s schedule with reinforcer magnitudes of either 30 or 300 microl of water. After acquisition, the water amounts were reversed for each rat. In Phase 2, the effects of the same reinforcer magnitudes on DRL 18-s schedule performance were examined across conditions. In Phase 3, each rat responded unider a DR1. 18-s schedule in which the water amotnts alternated between 30 and 300 microl daily. Throughout each phase of Experiment 1, the larger reinforcer magnitude resulted in higher response rates and lower reinforcement rates. The peak of the interresponse-time distributions was at a lower value tinder the larger reinforcer magnitude. In Experiment 2, 3 pigeons responded under a DRL 20-s schedule in which reinforcer magnitude (1-s or 6-s access to grain) varied iron session to session. Higher response rates and lower reinforcement rates occurred tinder the longer hopper duration. These results demonstrate that larger reinforcer magnitudes engender less efficient DRL schedule performance in both rats and pigeons, and when reinforcer magnitude was held constant between sessions or was varied daily. The present results are consistent with previous research demonstrating a decrease in efficiency as a function of increased reinforcer magnituide tinder procedures that require a period of time without a specified response. These findings also support the claim that DRI. schedule performance is not governed solely by a timing process.

  2. HOROPLAN: computer-assisted nurse scheduling using constraint-based programming.

    Science.gov (United States)

    Darmoni, S J; Fajner, A; Mahé, N; Leforestier, A; Vondracek, M; Stelian, O; Baldenweck, M

    1995-01-01

    Nurse scheduling is a difficult and time consuming task. The schedule has to determine the day to day shift assignments of each nurse for a specified period of time in a way that satisfies the given requirements as much as possible, taking into account the wishes of nurses as closely as possible. This paper presents a constraint-based, artificial intelligence approach by describing a prototype implementation developed with the Charme language and the first results of its use in the Rouen University Hospital. Horoplan implements a non-cyclical constraint-based scheduling, using some heuristics. Four levels of constraints were defined to give a maximum of flexibility: French level (e.g. number of worked hours in a year), hospital level (e.g. specific day-off), department level (e.g. specific shift) and care unit level (e.g. specific pattern for week-ends). Some constraints must always be verified and can not be overruled and some constraints can be overruled at a certain cost. Rescheduling is possible at any time specially in case of an unscheduled absence.

  3. [The effect of aluminum adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine].

    Science.gov (United States)

    Wang, Fang; Zhang, Ming; Xie, Bing-Feng; Cao, Han; Tong, Shao-Yong; Wang, Jun-Rong; Yu, Xiao-Ping; Tang, Yang; Yang, Jing-Ran; Sun, Ming-Bo

    2013-04-01

    To study the effect of aluminume adjuvant and immunization schedule on immunogenicity of Sabin inactivated poliovirus vaccine. Four batches of Sabin IPV were produced by different concentrations of type 1, 2, and 3 poliovirus and administrated on three-dose schedule at 0, 1, 2 months and 0, 2, 4 months on rats. Serum samples were collected one month after each dose and neutralizing antibody titers against three types poliovirus were determined by micro-neutralization assay. The GMTs of neutralizing antibodies against three types poliovirus increased significantly and the seropositivity rates were 100% in all groups after 3 doses. There was no significant difference between two immunization schedules, and the 0, 2, 4 month schedule could induce higher level neutralizing antibody compared to the 0, 1, 2 month schedule. The groups with aluminum adjuvant could induce higher level neutralizing antibody compared to the groups without adjuvant. Aluminum djuvant and immunization schedule could improve the immunogenicity of Sabin IPV.

  4. Comparing Book- and Tablet-Based Picture Activity Schedules: Acquisition and Preference.

    Science.gov (United States)

    Giles, Aimee; Markham, Victoria

    2017-09-01

    Picture activity schedules consist of a sequence of images representing the order of tasks for a person to complete. Although, picture activity schedules have traditionally been presented in a book format, recently picture activity schedules have been evaluated on technological devices such as an iPod™ touch. The present study compared the efficiency of picture activity schedule acquisition on book- and tablet-based modalities. In addition, participant preference for each modality was assessed. Three boys aged below 5 years with a diagnosis of autism participated. Participants were taught to follow the schedules using both modalities. Following mastery of each modality of picture activity schedule, a concurrent-chains preference assessment was conducted to evaluate participant preference for each modality. Differences in acquisition rates across the two modalities were marginal. Preference for book- or tablet-based schedules was idiosyncratic across participants.

  5. Off-Line and Dynamic Production Scheduling – A Comparative Case Study

    Directory of Open Access Journals (Sweden)

    Bożek Andrzej

    2016-03-01

    Full Text Available A comprehensive case study of manufacturing scheduling solutions development is given. It includes highly generalized scheduling problem as well as a few scheduling modes, methods and problem models. The considered problem combines flexible job shop structure, lot streaming with variable sublots, transport times, setup times, and machine calendars. Tabu search metaheuristic and constraint programming methods have been used for the off-line scheduling. Two dynamic scheduling methods have also been implemented, i.e., dispatching rules for the completely reactive scheduling and a multi-agent system for the predictivereactive scheduling. In these implementations three distinct models of the problem have been used, based on: graph representation, optimal constraint satisfaction, and Petri net formalism. Each of these solutions has been verified in computational experiments. The results are compared and some findings about advantages, disadvantages, and suggestions on using the solutions are formulated.

  6. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  7. Scheduled, intermittent stimulation of the thalamus reduces tics in Tourette syndrome.

    Science.gov (United States)

    Rossi, P Justin; Opri, Enrico; Shute, Jonathan B; Molina, Rene; Bowers, Dawn; Ward, Herbert; Foote, Kelly D; Gunduz, Aysegul; Okun, Michael S

    2016-08-01

    Personalized, scheduled deep brain stimulation in Tourette syndrome (TS) may permit clinically meaningful tic reduction while reducing side effects and increasing battery life. Here, we evaluate scheduled DBS applied to TS at two-year follow-up. Five patients underwent bilateral centromedian thalamic (CM) region DBS. A cranially contained constant-current device delivering stimulation on a scheduled duty cycle, as opposed to the standard continuous DBS paradigm was utilized. Baseline vs. 24-month outcomes were collected and analyzed, and a responder analysis was performed. A 40% improvement in the Modified Rush Tic Rating Scale (MRTRS) total score or Yale Global Tic Severity Scale (YGTSS) total score defined a full responder. Three of the 4 patients followed to 24 months reached full responder criteria and had a mean stimulation time of 1.85 h per day. One patient lost to follow-up evaluated at the last time point (month 18) was a non-responder. Patients exhibited improvements in MRTRS score beyond the improvements previously reported for the 6 month endpoint; on average, MRTRS total score was 15.6% better at 24 months than at 6 months and YGTSS total score was 14.8% better. Combining the patients into a single cohort revealed significant improvements in the MRTRS total score (-7.6 [5.64]; p = 0.02). Electrical stimulation of the centromedian thalamic region in a scheduled paradigm was effective in suppressing tics, particularly phonic tics. Full responders were able to achieve the positive DBS effect with a mean of 2.3 ± 0.9 (SEM) hours of DBS per day. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Scheduling for the National Hockey League Using a Multi-objective Evolutionary Algorithm

    Science.gov (United States)

    Craig, Sam; While, Lyndon; Barone, Luigi

    We describe a multi-objective evolutionary algorithm that derives schedules for the National Hockey League according to three objectives: minimising the teams' total travel, promoting equity in rest time between games, and minimising long streaks of home or away games. Experiments show that the system is able to derive schedules that beat the 2008-9 NHL schedule in all objectives simultaneously, and that it returns a set of schedules that offer a range of trade-offs across the objectives.

  9. 75 FR 47451 - Schedules of Controlled Substances; Placement of 2,5-Dimethoxy-4-(n)-propylthiophenethylamine and...

    Science.gov (United States)

    2010-08-06

    ... only one piece of background scientific data used to evaluate the abuse potential of drugs or other... opiates previously scheduled under the CSA. Even though the scheduling of BZP was finalized more than six...

  10. Phase II study of tailored S-1 monotherapy with a 1-week interval after a 2-week dosing period in elderly patients with advanced non-small cell lung cancer.

    Science.gov (United States)

    Goto, Hisatsugu; Okano, Yoshio; Machida, Hisanori; Hatakeyama, Nobuo; Ogushi, Fumitaka; Haku, Takashi; Kanematsu, Takanori; Urata, Tomoyuki; Kakiuchi, Soji; Hanibuchi, Masaki; Sone, Saburo; Nishioka, Yasuhiko

    2018-01-01

    S-1 is an oral fluoropyrimidine that is active in the treatment of non-small cell lung cancer (NSCLC); however, an optimal treatment schedule and appropriate dose adjustments of S-1 in elderly patients have not yet been established. We conducted a phase II trial to evaluate the efficacy and safety of a 2-week S-1 monotherapy treatment followed by a 1-week interval as a first-line treatment of elderly NSCLC patients, by adjusting the dose based on the individual creatinine clearance (Ccr) and body surface area (BSA). The primary endpoint was the disease control rate. Forty patients were enrolled. The disease control and response rates were 89.5% (95% confidence interval [CI] = 79.8-99.2) and 7.9% (95% CI = 0.0-16.4), respectively. The median progression-free survival and overall survival times were 4.4 months (95% CI = 4.2-8.5) and 17.0 months (95% CI = 11.2-18.7), respectively. Neutropenia, anorexia, hyponatremia, hypokalemia, and pneumonia of grade ≥ 3 occurred in 5.0%, 7.5%, 5.0%, 2.5%, and 2.5% of patients, respectively. Among the patient-reported outcomes, most of the individual factors in the patients' quality of life, including upper intestine-related symptoms improved with the treatment, except for dyspnea, which slightly albeit continuously worsened throughout the study. In elderly patients with previously untreated advanced NSCLC, a 2-week S-1 monotherapy treatment, tailored to both the Ccr and BSA, with a 1-week interval was well tolerated and demonstrated promising efficacy. This study was registered at the University Hospital Medical Information Network (UMIN) Center (ID: UMIN000002035), Japan. Copyright © 2017 The Japanese Respiratory Society. Published by Elsevier B.V. All rights reserved.

  11. Flexible Scheduling May Have a Positive Impact on School Library Circulation. A Review of: Gavigan, K., Pribesh, S., & Dickinson, G. (2010. Fixed or flexible schedule? Schedule impacts and school library circulation. Library and Information Science Research, 32(2, 131-37.

    Directory of Open Access Journals (Sweden)

    Ann Medaille

    2011-03-01

    Full Text Available Objective – To determine whether a significant, positive relationship exists between flexible scheduling in elementary school library media centers and per-pupil circulation statistics.Design – Online survey.Setting – Library media centers in public elementary schools in two states of the United States.Subjects – A total of 88 elementary school library media specialists completed the survey.Methods – A 22-question online survey was created using Inquisite software. A link to the survey was sent via e-mail to a 600-person random sample of public school library media specialists whose names were drawn from the memberships of the North Carolina School Library Media Association and the Virginia Educational Media Association, with combined memberships totalling approximately 2,000. A random sample of 600 was chosen to provide a 95% confidence level with a confidence interval of plus or minus three points. The survey included questions about school schedules (flexible, partially flexible, or fixed, collection size, circulation statistics, total student enrolment, school type (elementary, middle, or high, school location (urban, rural, or suburban, percentage of students eligible for free and reduced price lunch, numbers of full-time professional library media specialists employed at the school, access procedures, and library closure information. The survey response rate was 29.3% (176 respondents. Because fixed versus flexible scheduling is an issue that primarily affects elementary schools, the authors further narrowed their subject pool to 88 elementary school respondents. Data were analyzed using SPSS 16.0 statistical software. Correlation analysis, including the analysis of covariance (ANCOVA, was used to compare differences in the three scheduling types and to control for other variables (such as location, socioeconomic status, collection size, staffing, days closed, and others that may affect circulation.Main Results – Of the 88

  12. An open, randomised, multicentre, phase 3 trial comparing the efficacy of two tamoxifen schedules in preventing gynaecomastia induced by bicalutamide monotherapy in prostate cancer patients.

    Science.gov (United States)

    Bedognetti, Davide; Rubagotti, Alessandra; Conti, Giario; Francesca, Francesco; De Cobelli, Ottavio; Canclini, Luca; Gallucci, Michele; Aragona, Francesco; Di Tonno, Pasquale; Cortellini, Pietro; Martorana, Giuseppe; Lapini, Alberto; Boccardo, Francesco

    2010-02-01

    Bicalutamide monotherapy is a valuable option for prostate cancer (PCa) patients who wish to avoid the consequences of androgen deprivation; however, this treatment induces gynaecomastia and mastalgia in most patients. Tamoxifen is safe and effective in preventing breast events induced by bicalutamide monotherapy without affecting antitumor activity, but possible interference between bicalutamide and tamoxifen remains a matter of concern. To reduce the exposure to tamoxifen, we considered the putative advantages of weekly administration. To compare the efficacy of two different schedules of tamoxifen in preventing breast events. Toxicity, prostate-specific antigen behaviour, and sexual-functioning scores were also evaluated. This was a noninferiority trial. From December 2003 to February 2006, 80 patients with localised/locally advanced or biochemically recurrent PCa who were also candidates for bicalutamide single therapy were randomised to receive two different schedules of tamoxifen: daily (n=41) and weekly (n=39). Median follow-up was 24.2 mo. Daily bicalutamide (150 mg) plus daily tamoxifen 20mg continuously (daily group) or the same but with tamoxifen at 20mg weekly after the first 8 wk of daily treatment (weekly group). Three patients in the weekly group and one in the daily group were discontinued for adverse events. For gynaecomastia, we used ultrasonography. For mastalgia and sexual functioning, we used questionnaires. Gynaecomastia developed in 31.7% of patients in the daily group and in 74.4% of patients in the weekly group (p<0.0001), and it was more severe in patients who switched to weekly tamoxifen (p=0.001). Mastalgia occurred in 12.2% and 46.1% of patients, respectively (p=0.001). There were no major differences among treatment schedules relative to sexual functioning scores and incidence and severity of adverse events. No differences between groups in PSA behaviour and disease progression have been detected so far. This study demonstrated that

  13. Inactivated poliovirus vaccine given alone or in a sequential schedule with bivalent oral poliovirus vaccine in Chilean infants: a randomised, controlled, open-label, phase 4, non-inferiority study.

    Science.gov (United States)

    O'Ryan, Miguel; Bandyopadhyay, Ananda S; Villena, Rodolfo; Espinoza, Mónica; Novoa, José; Weldon, William C; Oberste, M Steven; Self, Steve; Borate, Bhavesh R; Asturias, Edwin J; Clemens, Ralf; Orenstein, Walter; Jimeno, José; Rüttimann, Ricardo; Costa Clemens, Sue Ann

    2015-11-01

    Bivalent oral poliovirus vaccine (bOPV; types 1 and 3) is expected to replace trivalent OPV (tOPV) globally by April, 2016, preceded by the introduction of at least one dose of inactivated poliovirus vaccine (IPV) in routine immunisation programmes to eliminate vaccine-associated or vaccine-derived poliomyelitis from serotype 2 poliovirus. Because data are needed on sequential IPV-bOPV schedules, we assessed the immunogenicity of two different IPV-bOPV schedules compared with an all-IPV schedule in infants. We did a randomised, controlled, open-label, non-inferiority trial with healthy, full-term (>2·5 kg birthweight) infants aged 8 weeks (± 7 days) at six well-child clinics in Santiago, Chile. We used supplied lists to randomly assign infants (1:1:1) to receive three polio vaccinations (IPV by injection or bOPV as oral drops) at age 8, 16, and 24 weeks in one of three sequential schedules: IPV-bOPV-bOPV, IPV-IPV-bOPV, or IPV-IPV-IPV. We did the randomisation with blocks of 12 stratified by study site. All analyses were done in a masked manner. Co-primary outcomes were non-inferiority of the bOPV-containing schedules compared with the all-IPV schedule for seroconversion (within a 10% margin) and antibody titres (within two-thirds log2 titres) to poliovirus serotypes 1 and 3 at age 28 weeks, analysed in the per-protocol population. Secondary outcomes were seroconversion and titres to serotype 2 and faecal shedding for 4 weeks after a monovalent OPV type 2 challenge at age 28 weeks. Safety analyses were done in the intention-to-treat population. This trial is registered with ClinicalTrials.gov, number NCT01841671, and is closed to new participants. Between April 25 and August 1, 2013, we assigned 570 infants to treatment: 190 to IPV-bOPV-bOPV, 192 to IPV-IPV-bOPV, and 188 to IPV-IPV-IPV. 564 (99%) were vaccinated and included in the intention-to-treat cohort, and 537 (94%) in the per-protocol analyses. In the IPV-bOPV-bOPV, IPV-IPV-bOPV, and IPV-IPV-IPV groups

  14. Choice between Single and Multiple Reinforcers in Concurrent-Chains Schedules

    Science.gov (United States)

    Mazur, James E.

    2006-01-01

    Pigeons responded on concurrent-chains schedules with equal variable-interval schedules as initial links. One terminal link delivered a single reinforcer after a fixed delay, and the other terminal link delivered either three or five reinforcers, each preceded by a fixed delay. Some conditions included a postreinforcer delay after the single…

  15. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  16. Automated refraction is stable 1 week after uncomplicated cataract surgery

    DEFF Research Database (Denmark)

    Ostri, Christoffer; Holfort, Stig K; Fich, Marianne S

    2018-01-01

    PURPOSE: To compare automated refraction 1 week and 1 month after uncomplicated cataract surgery. METHODS: In this prospective cohort study, we recruited patients in a 2-month period and included consecutive patients scheduled for bilateral small-incision phacoemulsification cataract surgery....... The exclusion criteria were (i) corneal and/or retinal pathology that could lead to automated refraction miscalculation and (ii) surgery complications. Automated refraction was measured 1 week and 1 month after surgery. RESULTS: Ninety-five patients met the in- and exclusion criteria and completed follow......-up. The mean refractive shift in spherical equivalent was -0.02 dioptre (D) between 1 week and 1 month after surgery and not statistical significant (p = 0.78, paired t-test). The magnitude of refractive shift in either myopic or hyperopic direction was neither correlated to age, preoperative corneal...

  17. Darbepoetin alfa once every 2 weeks for treatment of anemia in dialysis patients

    DEFF Research Database (Denmark)

    Mann, J; Kessler, M; Villa, Giulio Palludan

    2007-01-01

    AIM: Darbepoetin alfa has a longer half-life than epoetin-(EPO) alfa or beta, allowing administration at less frequent intervals for the treatment of renal anemia. The aim of the present analysis was to evaluate the efficacy and tolerability of an every-2-week (Q2W) schedule of darbepoetin alfa...

  18. Safety, Quality, Schedule: the motto of LS1

    CERN Multimedia

    2013-01-01

    The LHC’s first long shutdown, LS1, is a marathon that began on 16 February and will take us through to the beginning of 2015. Just as Olympic marathon runners have a motto, Citius, Altius, Fortius, so the athletes of LS1 work to the mantra of Safety, Quality, Schedule. Four months into LS1, they have settled into their rhythm, and things are going to plan.   The first task of LS1 was to bring the LHC up to room temperature - this was achieved in just 10 weeks. In parallel, preliminary tests for electrical quality assurance and leaks revealed essentially the level of wear and tear we’d expect after three years of running. One slightly anxious moment came when we looked at the RF fingers – the devices that ensure electrical contact in the beam pipes as they pass from one magnet to the next. Those of you with long memories will recall that before start-up, some of these got damaged at warm-up. The good news today is that with all eight sectors test...

  19. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  20. Auditory Training for Adults Who Have Hearing Loss: A Comparison of Spaced Versus Massed Practice Schedules.

    Science.gov (United States)

    Tye-Murray, Nancy; Spehar, Brent; Barcroft, Joe; Sommers, Mitchell

    2017-08-16

    The spacing effect in human memory research refers to situations in which people learn items better when they study items in spaced intervals rather than massed intervals. This investigation was conducted to compare the efficacy of meaning-oriented auditory training when administered with a spaced versus massed practice schedule. Forty-seven adult hearing aid users received 16 hr of auditory training. Participants in a spaced group (mean age = 64.6 years, SD = 14.7) trained twice per week, and participants in a massed group (mean age = 69.6 years, SD = 17.5) trained for 5 consecutive days each week. Participants completed speech perception tests before training, immediately following training, and then 3 months later. In line with transfer appropriate processing theory, tests assessed both trained tasks and an untrained task. Auditory training improved the speech recognition performance of participants in both groups. Benefits were maintained for 3 months. No effect of practice schedule was found on overall benefits achieved, on retention of benefits, nor on generalizability of benefits to nontrained tasks. The lack of spacing effect in otherwise effective auditory training suggests that perceptual learning may be subject to different influences than are other types of learning, such as vocabulary learning. Hence, clinicians might have latitude in recommending training schedules to accommodate patients' schedules.

  1. 78 FR 21858 - Schedules of Controlled Substances: Temporary Placement of Three Synthetic Cannabinoids Into...

    Science.gov (United States)

    2013-04-12

    ...), FDA acts as the lead agency within HHS in carrying out the Secretary's scheduling responsibilities... mixtures of these substances for the purpose of achieving intoxication has been identified as a reason for...

  2. 78 FR 28735 - Schedules of Controlled Substances: Temporary Placement of Three Synthetic Cannabinoids Into...

    Science.gov (United States)

    2013-05-16

    ... Abuse (NIDA), FDA acts as the lead agency within HHS in carrying out the Secretary's scheduling... of these substances for the purpose of achieving intoxication has been identified as a reason for...

  3. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  4. Influence of intravenous self-administered psychomotor stimulants on performance of rhesus monkeys in a multiple schedule paradigm.

    Science.gov (United States)

    Hoffmeister, F

    1980-01-01

    Rhesus monkeys were trained to complete three multiple schedules. The schedules consisted of three components: a fixed interval (component 1), a variable interval (component 2), and a fixed ratio (component 3). During components 1 and 2, pressing lever 1 was always reinforced by food delivery. During component 3, pressing lever 2 resulted in either food delivery or intravenous infusions of saline solution, solutions of cocaine, of d-amphetamine, of phenmetrazine, or fenetylline. In schedule I, animals were presented with all three components independent of key-pressing behavior during components 1 and 2. In schedule II the availability of component 2 was dependent on completion of component 1. Component 3 was made available only on completion of component 2. Noncompletion of components 1 or 2 resulted in time-out of 15 and 10 min, respectively. Schedule III was identical with schedule II, except that in schedule III the completion of components was indicated only by a change in the lever lights. The influence of self-administered drugs on behavior in all three components was evaluated. Self-administration of psychomotor stimulants impaired the performance of animals and delayed completion of components 1 and 2 of schedules I, II, and III. The effects on behavior were similar with low drug intake in schedule III, moderate intake in schedule II, and high drug intake in schedule I. These effects were strong with self-administration of phenmetrazine, moderate with self-administration of cocaine and d-amphetamine, and weak with self-administration of fenetylline.

  5. A real-time Excel-based scheduling solution for nursing staff reallocation.

    Science.gov (United States)

    Tuominen, Outi Anneli; Lundgren-Laine, Heljä; Kauppila, Wiveka; Hupli, Maija; Salanterä, Sanna

    2016-09-30

    Aim This article describes the development and testing of an Excel-based scheduling solution for the flexible allocation and reallocation of nurses to cover sudden, unplanned absences among permanent nursing staff. Method A quasi-experimental, one group, pre- and post-test study design was used ( Box 1 ) with total sampling. Participants (n=17) were selected purposefully by including all ward managers (n=8) and assistant ward managers (n=9) from one university hospital department. The number of sudden absences among the nursing staff was identified during two 4-week data collection periods (pre- and post-test). Results During the use of the paper-based scheduling system, 121 absences were identified; during the use of the Excel-based system, 106 were identified. The main reasons for the use of flexible 'floating' nurses were sick leave (n=66) and workload (n=31). Other reasons (n=29) included patient transfer to another hospital, scheduling errors and the start or end of employment. Conclusion The Excel-based scheduling solution offered better support in obtaining substitute labour inside the organisation, with smaller employment costs. It also reduced the number of tasks ward managers had to carry out during the process of reallocating staff.

  6. Schedules for home visits in the early postpartum period.

    Science.gov (United States)

    Yonemoto, Naohiro; Dowswell, Therese; Nagai, Shuko; Mori, Rintaro

    2017-08-02

    Maternal complications including psychological and mental health problems and neonatal morbidity have been commonly observed in the postpartum period. Home visits by health professionals or lay supporters in the weeks following the birth may prevent health problems from becoming chronic with long-term effects on women, their babies, and their families. To assess outcomes for women and babies of different home-visiting schedules during the early postpartum period. The review focuses on the frequency of home visits, the duration (when visits ended) and intensity, and on different types of home-visiting interventions. We searched the Cochrane Pregnancy and Childbirth Group's Trials Register (28 January 2013) and reference lists of retrieved articles. Randomised controlled trials (RCTs) (including cluster-RCTs) comparing different types of home-visiting interventions enrolling participants in the early postpartum period (up to 42 days after birth). We excluded studies in which women were enrolled and received an intervention during the antenatal period (even if the intervention continued into the postnatal period) and studies recruiting only women from specific high-risk groups. (e.g. women with alcohol or drug problems). Study eligibility was assessed by at least two review authors. Data extraction and assessment of risk of bias were carried out independently by at least two review authors. Data were entered into Review Manager software. We included data from 12 randomised trials with data for more than 11,000 women. The trials were carried out in countries across the world, and in both high- and low-resource settings. In low-resource settings women receiving usual care may have received no additional postnatal care after early hospital discharge.The interventions and control conditions varied considerably across studies with trials focusing on three broad types of comparisons: schedules involving more versus fewer postnatal home visits (five studies), schedules

  7. Scheduling Non-Preemptible Jobs to Minimize Peak Demand

    Directory of Open Access Journals (Sweden)

    Sean Yaw

    2017-10-01

    Full Text Available This paper examines an important problem in smart grid energy scheduling; peaks in power demand are proportionally more expensive to generate and provision for. The issue is exacerbated in local microgrids that do not benefit from the aggregate smoothing experienced by large grids. Demand-side scheduling can reduce these peaks by taking advantage of the fact that there is often flexibility in job start times. We focus attention on the case where the jobs are non-preemptible, meaning once started, they run to completion. The associated optimization problem is called the peak demand minimization problem, and has been previously shown to be NP-hard. Our results include an optimal fixed-parameter tractable algorithm, a polynomial-time approximation algorithm, as well as an effective heuristic that can also be used in an online setting of the problem. Simulation results show that these methods can reduce peak demand by up to 50% versus on-demand scheduling for household power jobs.

  8. On Multiple Users Scheduling Using Superposition Coding over Rayleigh Fading Channels

    KAUST Repository

    Zafar, Ammar

    2013-02-20

    In this letter, numerical results are provided to analyze the gains of multiple users scheduling via superposition coding with successive interference cancellation in comparison with the conventional single user scheduling in Rayleigh blockfading broadcast channels. The information-theoretic optimal power, rate and decoding order allocation for the superposition coding scheme are considered and the corresponding histogram for the optimal number of scheduled users is evaluated. Results show that at optimality there is a high probability that only two or three users are scheduled per channel transmission block. Numerical results for the gains of multiple users scheduling in terms of the long term throughput under hard and proportional fairness as well as for fixed merit weights for the users are also provided. These results show that the performance gain of multiple users scheduling over single user scheduling increases when the total number of users in the network increases, and it can exceed 10% for high number of users

  9. Missed deadline notification in best-effort schedulers

    Science.gov (United States)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  10. [The effects of 16-weeks pilates mat program on anthropometric variables and body composition in active adult women after a short detraining period].

    Science.gov (United States)

    Vaquero-Cristóbal, Raquel; Alacid, Fernando; Esparza-Ros, Francisco; Muyor, José M; López-Miñarro, Pedro Ángel

    2015-04-01

    previous studies have analysed the effect of mat Pilates practice on anthropometric variables and body composition in sedentaries. To date no researchs have investigated the benefits of Pilates on these variables after a short detraining period. to determine the effect of a 16-week mat Pilates program on anthropometric variables, body composition and somatotype of women with previous practice experience after three weeks of detraining period. twenty-one women underwent a complete anthropometric assessment according with ISAK guidelines before and after a 16 week mat Pilates program (two days, one hour). All women had one to three years of mat Pilates experience and came to three weeks of detraining period (Christmas holiday). women showed significant decreases for body mass, BMI, upper limb (biceps and triceps) and trunk (subscapular, iliac crest, supraspinale and abdominal) individual skinfolds, 6 and 8 skinfold sums, endomorphy and fat mass; and a significant increases for muscle mass. The mean somatotype was classified as mesomorphic endomorph in the pre- (4.91, 4.01, 1.47) and post-test (4.68, 4.16, 1.69). Eight women changed their somatotype clasification after the intervention program. the practice of mat Pilates for 16 weeks caused changes associated with health state improvements on anthropometric variables, especially on skinfolds which significantly decreased, body composition (fat and muscle masses decreased and increased, respectively) and somatotype (there was a significantly decreased on the endomorph component in experienced women after three week of detraning. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.

  11. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  12. Personnel scheduling using an integer programming model- an application at Avanti Blue-Nile Hotels.

    Science.gov (United States)

    Kassa, Biniyam Asmare; Tizazu, Anteneh Eshetu

    2013-01-01

    In this paper, we report perhaps a first of its kind application of management science in the Ethiopian hotel industry. Avanti Blue Nile Hotels, a newly established five star hotel in Bahir Dar, is the company for which we developed an integer programming model that determines an optimal weekly shift schedule for the Hotel's engineering department personnel while satisfying several constraints including weekly rest requirements per employee, rest requirements between working shifts per employee, required number of personnel per shift, and other constraints. The model is implemented on an excel solver routine. The model enables the company's personnel department management to develop a fair personnel schedule as needed and to effectively utilize personnel resources while satisfying several technical, legal and economic requirements. These encouraging achievements make us optimistic about the gains other Ethiopian organizations can amass by introducing management science approaches in their management planning and decision making systems.

  13. Hybrid glowworm swarm optimization for task scheduling in the cloud environment

    Science.gov (United States)

    Zhou, Jing; Dong, Shoubin

    2018-06-01

    In recent years many heuristic algorithms have been proposed to solve task scheduling problems in the cloud environment owing to their optimization capability. This article proposes a hybrid glowworm swarm optimization (HGSO) based on glowworm swarm optimization (GSO), which uses a technique of evolutionary computation, a strategy of quantum behaviour based on the principle of neighbourhood, offspring production and random walk, to achieve more efficient scheduling with reasonable scheduling costs. The proposed HGSO reduces the redundant computation and the dependence on the initialization of GSO, accelerates the convergence and more easily escapes from local optima. The conducted experiments and statistical analysis showed that in most cases the proposed HGSO algorithm outperformed previous heuristic algorithms to deal with independent tasks.

  14. An Extended Flexible Job Shop Scheduling Model for Flight Deck Scheduling with Priority, Parallel Operations, and Sequence Flexibility

    Directory of Open Access Journals (Sweden)

    Lianfei Yu

    2017-01-01

    Full Text Available Efficient scheduling for the supporting operations of aircrafts in flight deck is critical to the aircraft carrier, and even several seconds’ improvement may lead to totally converse outcome of a battle. In the paper, we ameliorate the supporting operations of carrier-based aircrafts and investigate three simultaneous operation relationships during the supporting process, including precedence constraints, parallel operations, and sequence flexibility. Furthermore, multifunctional aircrafts have to take off synergistically and participate in a combat cooperatively. However, their takeoff order must be restrictively prioritized during the scheduling period accorded by certain operational regulations. To efficiently prioritize the takeoff order while minimizing the total time budget on the whole takeoff duration, we propose a novel mixed integer liner programming formulation (MILP for the flight deck scheduling problem. Motivated by the hardness of MILP, we design an improved differential evolution algorithm combined with typical local search strategies to improve computational efficiency. We numerically compare the performance of our algorithm with the classical genetic algorithm and normal differential evolution algorithm and the results show that our algorithm obtains better scheduling schemes that can meet both the operational relations and the takeoff priority requirements.

  15. Medium-dose-rate brachytherapy of cancer of the cervix: preliminary results of a prospectively designed schedule based on the linear-quadratic model

    International Nuclear Information System (INIS)

    Leborgne, Felix; Fowler, Jack F.; Leborgne, Jose H.; Zubizarreta, Eduardo; Curochquin, Rene

    1999-01-01

    Purpose: To compare results and complications of our previous low-dose-rate (LDR) brachytherapy schedule for early-stage cancer of the cervix, with a prospectively designed medium-dose-rate (MDR) schedule, based on the linear-quadratic model (LQ). Methods and Materials: A combination of brachytherapy, external beam pelvic and parametrial irradiation was used in 102 consecutive Stage Ib-IIb LDR treated patients (1986-1990) and 42 equally staged MDR treated patients (1994-1996). The planned MDR schedule consisted of three insertions on three treatment days with six 8-Gy brachytherapy fractions to Point A, two on each treatment day with an interfraction interval of 6 hours, plus 18 Gy external whole pelvic dose, and followed by additional parametrial irradiation. The calculated biologically effective dose (BED) for tumor was 90 Gy 10 and for rectum below 125 Gy 3 . Results: In practice the MDR brachytherapy schedule achieved a tumor BED of 86 Gy 10 and a rectal BED of 101 Gy 3 . The latter was better than originally planned due to a reduction from 85% to 77% in the percentage of the mean dose to the rectum in relation to Point A. The mean overall treatment time was 10 days shorter for MDR in comparison with LDR. The 3-year actuarial central control for LDR and MDR was 97% and 98% (p = NS), respectively. The Grades 2 and 3 late complications (scale 0 to 3) were 1% and 2.4%, respectively for LDR (3-year) and MDR (2-year). Conclusions: LQ is a reliable tool for designing new schedules with altered fractionation and dose rates. The MDR schedule has proven to be an equivalent treatment schedule compared with LDR, with an additional advantage of having a shorter overall treatment time. The mean rectal BED Gy 3 was lower than expected

  16. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  17. Goal programming for cyclical auxiliary police scheduling at UiTM Cawangan Perlis

    Science.gov (United States)

    Mustapar, Wasilatul Effah; Nasir, Diana Sirmayunie Mohd; Nor, Nor Azriani Mohamad; Abas, Sharifah Fhahriyah Syed

    2017-11-01

    Constructing a good and fair schedule for shift workers poses a great challenge as it requires a lot of time and effort. In this study, goal programming has been applied on scheduling to achieve the hard and soft constraints for a cyclical schedule that would ease the head of auxiliary police at building new schedules. To accomplish this goal, shift types were assigned in order to provide a fair schedule that takes into account the auxiliary police's policies and preferences. The model was run using Lingo software. Three out of four goals set for the study were achieved. In addition, the results considered an equal allocation for every auxiliary police, namely 70% for total duty and 30% for the day. Furthermore, the schedule was able to cyclically generate another 10 sets schedule. More importantly, the model has provided unbiased scheduling of auxiliary policies which led to high satisfaction in auxiliary police management.

  18. An Evaluation of Parallel Job Scheduling for ASCI Blue-Pacific

    International Nuclear Information System (INIS)

    Franke, H.; Jann, J.; Moreira, J.; Pattnaik, P.; Jette, M.

    1999-01-01

    In this paper we analyze the behavior of a gang-scheduling strategy that we are developing for the ASCI Blue-Pacific machines. Using actual job logs for one of the ASCI machines we generate a statistical model of the current workload with hyper Erlang distributions. We then vary the parameters of those distributions to generate various workloads, representative of different operating points of the machine. Through simulation we obtain performance parameters for three different scheduling strategies: (i) first-come first-serve, (ii) gang-scheduling, and (iii) backfilling. Our results show that backfilling, can be very effective for the common operating points in the 60-70% utilization range. However, for higher utilization rates, time-sharing techniques such as gang-scheduling offer much better performance

  19. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  20. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  1. Employee Responses to Flexible Work Schedules: An Inter-Organization, Inter-System Comparison.

    Science.gov (United States)

    Pierce, Jon L.; Newstrom, John W.

    1982-01-01

    Compared employee affective and behavioral responses to four work schedules--a fixed-hour schedule and three variations of flexible working hours. Hypothesized systematic differences in employee responses reflecting increased flexibility were not supported. Employees generally responded more favorably to flexible hour systems as contrasted with…

  2. Effects on quality of life of weekly docetaxel-based chemotherapy in patients with locally advanced or metastatic breast cancer: results of a single-centre randomized phase 3 trial.

    Science.gov (United States)

    Nuzzo, Francesco; Morabito, Alessandro; Gravina, Adriano; Di Rella, Francesca; Landi, Gabriella; Pacilio, Carmen; Labonia, Vincenzo; Rossi, Emanuela; De Maio, Ermelinda; Piccirillo, Maria Carmela; D'Aiuto, Giuseppe; Thomas, Renato; Rinaldo, Massimo; Botti, Gerardo; Di Bonito, Maurizio; Di Maio, Massimo; Gallo, Ciro; Perrone, Francesco; de Matteis, Andrea

    2011-02-16

    To evaluate whether weekly schedules of docetaxel-based chemotherapy were superior to 3-weekly ones in terms of quality of life in locally advanced or metastatic breast cancer. Patients with locally advanced or metastatic breast cancer, aged ≤ 70 years, performance status 0-2, chemotherapy-naive for metastatic disease, were eligible. They were randomized to weekly or 3-weekly combination of docetaxel and epirubicin, if they were not treated with adjuvant anthracyclines, or docetaxel and capecitabine, if treated with adjuvant anthracyclines. Primary end-point was global quality of life change at 6-weeks, measured by EORTC QLQ-C30. With two-sided alpha 0.05 and 80% power for 35% effect size, 130 patients per arm were needed. From February 2004 to March 2008, 139 patients were randomized, 70 to weekly and 69 to 3-weekly arm; 129 and 89 patients filled baseline and 6-week questionnaires, respectively. Global quality of life was better in the 3-weekly arm (p = 0.03); patients treated with weekly schedules presented a significantly worsening in role functioning and financial scores (p = 0.02 and p < 0.001). Neutropenia and stomatitis were worse in the 3-weekly arm, where two toxic deaths were observed. Overall response rate was 39.1% and 33.3% in 3-weekly and weekly arms; hazard ratio of progression was 1.29 (95% CI: 0.84-1.97) and hazard ratio of death was 1.38 (95% CI: 0.82-2.30) in the weekly arm. In this trial, the weekly schedules of docetaxel-based chemotherapy appear to be inferior to the 3-weekly one in terms of quality of life in patients with locally advanced or metastatic breast cancer. ClinicalTrials.gov NCT00540800.

  3. The Risk of Developing Diabetes in Association With Long Working Hours Differs by Shift Work Schedules

    Directory of Open Access Journals (Sweden)

    Akira Bannai

    2016-09-01

    Full Text Available Background: The impact of long working hours on diabetes is controversial; however, shift work is known to increase the risk of diabetes. This study aimed to investigate the association between long working hours and diabetes among civil servants in Japan separately by shift work schedules. Methods: A prospective cohort study was conducted from April 2003 to March 2009. A total of 3195 men aged ≥35 years who underwent an annual health checkup at baseline were analyzed by shift work schedules (2371 nonshift workers and 824 shift workers. Self-reported working hours were categorized as 35–44 and ≥45 hours per week. The incidence of diabetes was confirmed by fasting plasma glucose concentration ≥126 mg/dL and/or selfreported medical diagnosis of diabetes at the annual checkup. A Cox proportional model was used to calculate hazard ratios (HRs and 95% confidence intervals (CIs for developing diabetes associated with long working hours. Results: The median follow-up period of non-shift and shift workers was 5.0 and 4.9 years, respectively. During this period, 138 non-shift workers and 46 shift workers developed diabetes. A decreased HR was found among nonshift workers working ≥45 hours per week (HR 0.84; 95% CI, 0.57–1.24; however, shift workers working ≥45 hours per week had a significantly increased risk of diabetes (HR 2.43; 95% CI, 1.21–5.10 compared with those working 35–44 hours per week. An analysis restricted to non-clerical workers also showed similar results. Conclusions: The risk of diabetes associated with long working hours differed by shift work schedules.

  4. The Risk of Developing Diabetes in Association With Long Working Hours Differs by Shift Work Schedules.

    Science.gov (United States)

    Bannai, Akira; Yoshioka, Eiji; Saijo, Yasuaki; Sasaki, Sachiko; Kishi, Reiko; Tamakoshi, Akiko

    2016-09-05

    The impact of long working hours on diabetes is controversial; however, shift work is known to increase the risk of diabetes. This study aimed to investigate the association between long working hours and diabetes among civil servants in Japan separately by shift work schedules. A prospective cohort study was conducted from April 2003 to March 2009. A total of 3195 men aged ≥35 years who underwent an annual health checkup at baseline were analyzed by shift work schedules (2371 non-shift workers and 824 shift workers). Self-reported working hours were categorized as 35-44 and ≥45 hours per week. The incidence of diabetes was confirmed by fasting plasma glucose concentration ≥126 mg/dL and/or self-reported medical diagnosis of diabetes at the annual checkup. A Cox proportional model was used to calculate hazard ratios (HRs) and 95% confidence intervals (CIs) for developing diabetes associated with long working hours. The median follow-up period of non-shift and shift workers was 5.0 and 4.9 years, respectively. During this period, 138 non-shift workers and 46 shift workers developed diabetes. A decreased HR was found among non-shift workers working ≥45 hours per week (HR 0.84; 95% CI, 0.57-1.24); however, shift workers working ≥45 hours per week had a significantly increased risk of diabetes (HR 2.43; 95% CI, 1.21-5.10) compared with those working 35-44 hours per week. An analysis restricted to non-clerical workers also showed similar results. The risk of diabetes associated with long working hours differed by shift work schedules.

  5. Fractionation schedule affects transforming growth factor β expression in chronic radiation enteropathy

    International Nuclear Information System (INIS)

    Hauer-Jensen, Martin; Richter, Konrad K.; Sung, C.-C.; Langberg, Carl W.

    1995-01-01

    Purpose/Objective: The risk of intestinal obstruction from fibrotic strictures is a major dose limiting factor in abdominal radiation therapy. We have shown that chronic intestinal radiation injury (radiation enteropathy) is associated with sustained over-expression of the fibrogenic cytokine, transforming growth factor beta (TGF-β). This study used quantitative computerized image analysis to examine the relationship between TGF-β expression and specific histopathologic alterations as a function of fractionation schedule. Materials and Methods: Localized fractionated small bowel irradiation was performed in a rat model developed in our laboratory: 49 male rats were orchiectomized and a loop of small bowel was sutured to the inside of the scrotum. After 3 weeks recovery, the intestine within the artificial 'scrotal hernia' was sham-irradiated (Controls) or exposed to a total dose of 50.4 Gy orthovoltage radiation, given either as 18 daily fractions of 2.8 Gy (Group I) or as 9 daily fractions of 5.6 Gy (Group II). Groups of animals were euthanized at 2 weeks (early injury) and 26 weeks (chronic injury). Specimens were prepared for immunohistochemistry and histopathology. Extracellular TGF-β was detected with a polyclonal antibody, and protein expression was quantified by computerized image analysis. Twenty separate 40X fields per specimen were digitized, and the average number of stained pixels relative to total pixels was determined. Histopathologic injury was assessed in H+E sections with a previously validated Radiation Injury Score (RIS). Results: Irradiated animals had significantly higher levels of extracellular TGF-β immunoreactivity at both 2 weeks and 26 weeks (p<0.01). TGF-β expression correlated with RIS at both time points (p<0.001). Group II had significantly greater RIS and TGF-β expression than group I (p<0.01). TGF-β expression at 2 weeks correlated with epithelial atypia, mucosal ulceration, and subserosal thickening (p<0.01). At 26 weeks, TGF

  6. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  7. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  8. Maternal methadone dosing schedule and fetal neurobehavior

    Science.gov (United States)

    Jansson, Lauren M.; DiPietro, Janet A.; Velez, Martha; Elko, Andrea; Knauer, Heather; Kivlighan, Katie T.

    2008-01-01

    Objective Daily methadone maintenance is the standard of care for opiate dependency during pregnancy. Previous research has indicated that single-dose maternal methadone administration significantly suppresses fetal neurobehaviors. The purpose of this study was to determine if split-dosing would have less impact on fetal neurobehavior than single-dose administration. Methods Forty methadone-maintained women were evaluated at peak and trough maternal methadone levels on single- and split-dosing schedules. Monitoring sessions occurred at 36 and 37 weeks gestation in a counterbalanced study design. Fetal measures included heart rate, variability, accelerations, motor activity and fetal movement-heart rate coupling (FM-FHR). Maternal measures included heart period, variability, skin conductance, respiration and vagal tone. Repeated measure analysis of variance was used to evaluate within-subject changes between split- and single-dosing regimens. Results All fetal neurobehavioral parameters were suppressed by maternal methadone administration, regardless of dosing regimen. Fetal parameters at peak were significantly lower during single vs. split methadone administration. FM-FHR coupling was less suppressed from trough to peak during split-dosing vs. single-dosing. Maternal physiologic parameters were generally unaffected by dosing condition. Conclusion Split- dosed fetuses displayed less neurobehavioral suppression from trough to peak maternal methadone levels as compared to single-dosed fetuses. Split-dosing may be beneficial for methadone-maintained pregnant women. PMID:19085624

  9. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    Science.gov (United States)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  10. Preventive Maintenance Scheduling for Multicogeneration Plants with Production Constraints Using Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Khaled Alhamad

    2015-01-01

    Full Text Available This paper describes a method developed to schedule the preventive maintenance tasks of the generation and desalination units in separate and linked cogeneration plants provided that all the necessary maintenance and production constraints are satisfied. The proposed methodology is used to generate two preventing maintenance schedules, one for electricity and the other for distiller. Two types of crossover operators were adopted, 2-point and 4-point. The objective function of the model is to maximize the available number of operational units in each plant. The results obtained were satisfying the problem parameters. However, 4-point slightly produce better solution than 2-point ones for both electricity and water distiller. The performance as well as the effectiveness of the genetic algorithm in solving preventive maintenance scheduling is applied and tested on a real system of 21 units for electricity and 21 units for water. The results presented here show a great potential for utility applications for effective energy management over a time horizon of 52 weeks. The model presented is an effective decision tool that optimizes the solution of the maintenance scheduling problem for cogeneration plants under maintenance and production constraints.

  11. Body Stalk Anomaly in a 9-Week Pregnancy

    Directory of Open Access Journals (Sweden)

    Fabio E. Quijano

    2014-01-01

    Full Text Available Body stalk anomaly is a rare and severe malformation syndrome in which the exact pathophysiology and trigger factors are still unknown. This is a case of a 30-year-old patient who underwent ultrasound at 9 weeks of gestation. It revealed an abnormal location of the inferior body of the embryo in the coelomic space. The findings suggested a short umbilical cord syndrome. In order to confirm the diagnosis, the patient was scheduled for a second ultrasonography at 11 weeks of gestation. The obtained images, confirmed the location of the inferior body in the coelomic space with no visible bladder, absence of the right leg, severe abdominal wall defect, consistent with an omphalocele, and a short 5 mm umbilical cord. These last ultrasonographic findings were consistent with body stalk anomaly. Because of severe malformation incompatible with life, the patient was offered termination of pregnancy. Pathologic examination confirmed the suspected pathology of body stalk anomaly.

  12. Report from the June Trigger and Physics Week

    CERN Multimedia

    Chris Bee

    The week of June 4th saw the 5th ATLAS Trigger and Physics week at CERN. The meeting, bringing together people working in the trigger, data preparation, detector combined-performance and physics groups, aimed at focusing work and discussions on preparing ATLAS for first data-taking. The meeting started on Monday afternoon with a set of plenary presentations on topics ranging from software status and validation, the ATLAS analysis model and its implications for the computing model, and initial ideas for trigger menus for the expected LHC start-up luminosity of 1031cm-2s-1. There was also a report from Peter Jenni on the expected LHC start-up schedule. The participation exceeded the organisers' wildest dreams as the CERN Council Chamber (seating capacity 160) proved woefully inadequate to seat everyone. A packed Council Chamber for the opening plenary Tuesday was dedicated to parallel sessions of the trigger and combined performance groups. A great deal of progress was presented in all areas, notably on...

  13. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  14. Global Optimization of Nonlinear Blend-Scheduling Problems

    Directory of Open Access Journals (Sweden)

    Pedro A. Castillo Castillo

    2017-04-01

    Full Text Available The scheduling of gasoline-blending operations is an important problem in the oil refining industry. This problem not only exhibits the combinatorial nature that is intrinsic to scheduling problems, but also non-convex nonlinear behavior, due to the blending of various materials with different quality properties. In this work, a global optimization algorithm is proposed to solve a previously published continuous-time mixed-integer nonlinear scheduling model for gasoline blending. The model includes blend recipe optimization, the distribution problem, and several important operational features and constraints. The algorithm employs piecewise McCormick relaxation (PMCR and normalized multiparametric disaggregation technique (NMDT to compute estimates of the global optimum. These techniques partition the domain of one of the variables in a bilinear term and generate convex relaxations for each partition. By increasing the number of partitions and reducing the domain of the variables, the algorithm is able to refine the estimates of the global solution. The algorithm is compared to two commercial global solvers and two heuristic methods by solving four examples from the literature. Results show that the proposed global optimization algorithm performs on par with commercial solvers but is not as fast as heuristic approaches.

  15. A branch-and-price algorithm for the long-term home care scheduling problem

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    2012-01-01

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans such that a high quality of service is maintained, the work hours of the employees are respected, and the overall cost is kept as low as possible. We...... propose a branchand-price algorithm for the long-term home care scheduling problem. The pricing problem generates a one-day plan for an employee, and the master problem merges the plans with respect to regularity constraints. The method is capable of generating plans with up to 44 visits during one week....

  16. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  17. A unique, fast-forwards rotating schedule with 12-h long shifts prevents chronic sleep debt.

    Science.gov (United States)

    Fischer, Dorothee; Vetter, Céline; Oberlinner, Christoph; Wegener, Sven; Roenneberg, Till

    2016-01-01

    Sleep debt--together with circadian misalignment--is considered a central factor for adverse health outcomes associated with shift work. Here, we describe in detail sleep-wake behavior in a fast-forward rotating 12-h shift schedule, which involves at least 24 hours off after each shift and thus allows examining the role of immediate recovery after shift-specific sleep debt. Thirty-five participants at two chemical plants in Germany were chronotyped using the Munich ChronoType Questionnaire for Shift-Workers (MCTQ(Shift)) and wore actimeters throughout the two-week study period. From these actimetry recordings, we computed sleep and nap duration, social jetlag (a measure of circadian misalignment), and the daily timing of activity and sleep (center of gravity and mid-sleep, respectively). We observed that the long off-work periods between each shift create a fast alternation between shortened (mean ± standard deviation, 5h 17min ± 56min) and extended (8h 25min ± 72min) sleep episodes resulting in immanent reductions of sleep debt. Additionally, extensive napping of early chronotypes (up to 3 hours before the night shift) statistically compensated short sleep durations after the night shift. Partial rank correlations showed chronotype-dependent patterns of sleep and activity that were similar to those previously described in 8-h schedules; however, sleep before the day shift did not differ between chronotypes. Our findings indicate that schedules preventing a build-up of chronic sleep debt may reduce detrimental effects of shift work irrespective of shift duration. Prospective studies are needed to further elucidate the relationship between sleep, the circadian system, and health and safety hazards.

  18. Freezing the Master Production Schedule Under Rolling Planning Horizons

    OpenAIRE

    V. Sridharan; William L. Berry; V. Udayabhanu

    1987-01-01

    The stability of the Master Production Schedule (MPS) is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning ...

  19. Treating Non-Retentive Encopresis with Rewarded Scheduled Toilet Visits

    Science.gov (United States)

    Boles, Richard E; Roberts, Michael C; Vernberg, Eric M

    2008-01-01

    We evaluated the effects of rewarded scheduled toilet sits on non-retentive encopretic behavior of an elementary-school student receiving services for serious emotional disturbance. A multidisciplinary team implemented the 8-week intervention using a multiple baseline across settings design. The results showed an increase in sitting on the toilet and a decline in encopretic episodes in both school and home settings. These findings support the use of a behavioral intervention for children with significant behavioral disorders within a classroom setting. PMID:22477690

  20. Optimizing donor scheduling before recruitment: An effective approach to increasing apheresis platelet collections.

    Science.gov (United States)

    Lokhandwala, Parvez M; Shike, Hiroko; Wang, Ming; Domen, Ronald E; George, Melissa R

    2018-01-01

    Typical approach for increasing apheresis platelet collections is to recruit new donors. Here, we investigated the effectiveness of an alternative strategy: optimizing donor scheduling, prior to recruitment, at a hospital-based blood donor center. Analysis of collections, during the 89 consecutive months since opening of donor center, was performed. Linear regression and segmented time-series analyses were performed to calculate growth rates of collections and to test for statistical differences, respectively. Pre-intervention donor scheduling capacity was 39/month. In the absence of active donor recruitment, during the first 29 months, the number of collections rose gradually to 24/month (growth-rate of 0.70/month). However, between month-30 and -55, collections exhibited a plateau at 25.6 ± 3.0 (growth-rate of -0.09/month) (pcollection days/week (month-72). Consequently, the scheduling capacity increased to 130/month. Post-interventions, apheresis platelet collections between month-56 and -81 exhibited a spontaneous renewed growth at a rate of 0.62/month (pcollections. Apheresis platelet collections plateau at nearly 2/3rd of the scheduling capacity. Optimizing the scheduling capacity prior to active donor recruitment is an effective strategy to increase platelet collections at a hospital-based donor center.

  1. A Single-Machine Two-Agent Scheduling Problem by a Branch-and-Bound and Three Simulated Annealing Algorithms

    Directory of Open Access Journals (Sweden)

    Shangchia Liu

    2015-01-01

    Full Text Available In the field of distributed decision making, different agents share a common processing resource, and each agent wants to minimize a cost function depending on its jobs only. These issues arise in different application contexts, including real-time systems, integrated service networks, industrial districts, and telecommunication systems. Motivated by its importance on practical applications, we consider two-agent scheduling on a single machine where the objective is to minimize the total completion time of the jobs of the first agent with the restriction that an upper bound is allowed the total completion time of the jobs for the second agent. For solving the proposed problem, a branch-and-bound and three simulated annealing algorithms are developed for the optimal solution, respectively. In addition, the extensive computational experiments are also conducted to test the performance of the algorithms.

  2. Vinorelbine plus 3-weekly trastuzumab in metastatic breast cancer: a single-centre phase 2 trial

    Directory of Open Access Journals (Sweden)

    Staiano Maria

    2007-03-01

    Full Text Available Abstract Background After two studies reporting response rates higher than 70% in HER2-positive metastatic breast cancer with weekly trastuzumab and vinorelbine, we planned a phase 2 study to test activity of the same combination, with trastuzumab given every 3 weeks. Methods Patients with HER2-positive metastatic breast cancer (3+ at immunohistochemistry or positive at fluorescence in situ hybridization, PS ≤2, normal left-ventricular ejection fraction (LVEF and no more than one chemotherapy line for metastatic disease were eligible. Vinorelbine (30 mg/m2 was given on days 1&8 every 21 and trastuzumab (8 mg/kg day 1, then 6 mg/kg every 21 days. A single-stage phase 2 design, with p0 = 0.45, p1 = 0.65, type I and II error = 0.10, was applied; 22 objective responses were required in 39 patients. Results From Nov 2002 to May 2005, 50 patients were enrolled, with a median age of 54 years (range 31–81. Among 40 patients eligible for response assessment, there were 7 complete and 13 partial responses (overall response rate 50%; 95% exact CI 33.8–66.2; 11 patients had disease stabilization, lasting more than 6 months in 10 cases. Response rate did not vary according to patients and tumor characteristics, type and amount of previous chemotherapy. Within the whole series, median progression-free survival was 9.6 months (95% CI 7.3–12.3, median overall survival 22.7 months (95% CI 19.5-NA. Fifteen patients (30% developed brain metastases at a median time of 12 months (range 1–25. There was one toxic death due to renal failure in a patient receiving concomitant pamidronate. Twenty-three patients (46% had grade 3–4 neutropenia, 2 (4% grade 3 anemia, 4 (8% febrile neutropenia. Two patients stopped treatment because of grade 2 decline of LVEF and one patient because of grade 2 liver toxicity concomitant with a grade 1 decline of LVEF. One patient stopped trastuzumab after 50 cycles because of grade 1 decline of LVEF. Conclusion Although lower

  3. Basic Features of Customer Satisfaction with Train Schedules

    Science.gov (United States)

    Murakoshi, Akiko; Kunimatsu, Taketoshi; Saito, Ayano

    This paper aims to reveal the fundamental features of customer satisfaction with train schedules, which is one of the most basic services provided by a railway company. A customer satisfaction survey of passengers who frequently utilize three lines in the metropolitan area was conducted; we obtained the following findings: (a) out of nine factors to evaluate a train schedule from a passenger's viewpoint, the four most important ones are the frequency of trains running, punctuality, congestion rate, and time distance; (b) the ride-frequency influences the degree of satisfaction with train schedules in a particular line; and (c) it is important to set a numeric goal for the level of customer satisfaction by grasping the relationship between the transport service and a passenger's satisfaction with that service. The difference between customer satisfaction and passenger disutility is also discussed. The findings are expected to help conduct customer satisfaction surveys and also to form the basis for establishing a method by which to evaluate a train schedule from passengers' satisfaction ratings.

  4. Phase I clinical and pharmacokinetic study of S-1 plus oral leucovorin in patients with metastatic colorectal cancer.

    Science.gov (United States)

    Yoshino, Takayuki; Hyodo, Ichinosuke; Nishina, Tomohiro; Narahara, Hiroyuki; Sugimoto, Naotoshi; Yoshisue, Kunihiro; Boku, Narikazu

    2017-01-01

    S-1 has shown a response rate of 35% in chemonaïve patients with metastatic colorectal cancer (mCRC). Leucovorin enhances the antitumor activity of 5-fluorouracil, and concurrent oral administration of S-1 and leucovorin may represent a more active treatment option for mCRC. S-1 (35 mg/m 2 ) and leucovorin (25 mg/body) were orally administered twice daily to chemonaïve patients with mCRC. Predefined dose (schedule)-limiting toxicities (DLTs) during the first course and treatment continuity during the first two courses were evaluated during three periods of treatment with S-1 plus leucovorin (level 0, 2 weeks; level 1, 3 weeks; and level 2, 4 weeks), each followed by a 2-week rest. The pharmacokinetics (PK) of S-1 and leucovorin were studied on days 1 and 14 of the first course. Fifteen patients were enrolled. All three patients had DLTs at level 2, and this level was considered the maximum tolerated schedule. Level 0 was designated as the recommended schedule based on the incidences of DLTs and treatment continuity. The main toxic effects were gastrointestinal, such as diarrhea and stomatitis. There was no grade 4 adverse event or treatment-related death. The overall response rate was 67% (95% confidence interval, 38-88%). The PK profiles of S-1 plus leucovorin were similar to those in previous studies. The recommended schedule was 2 weeks of S-1 plus leucovorin followed by a 2-week rest. The increased response and gastrointestinal toxicities of S-1 plus leucovorin as compared with S-1 monotherapy suggest that co-administration of leucovorin enhanced the activity of S-1.

  5. Research on information models for the construction schedule management based on the IFC standard

    Directory of Open Access Journals (Sweden)

    Weirui Xue

    2015-05-01

    Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

  6. Reirradiation of head and neck neoplasms using twice-a-day scheduling

    International Nuclear Information System (INIS)

    Tercilla, O.F.; Schmidt-Ullrich, R.; Wazer, D.E.

    1993-01-01

    Between 1985 and 1988, we have explored the value of twice-a-day (BID) irradiation for the retreatment of head and neck neoplasms. In this pilot study of ten patients we used a schedule of BID irradiation at fraction sizes between 1.4 and 1.6 Gy separated by at least 6 h. Of the four patients were treated with curative intent, three patients received 30 Gy in 20 fractions over twelve days followed within ten days by an interstitial/intracavitary Ir-192 implant boost to doses of 30 to 40 Gy and one patient was treated with a 32 Gy BID boost. Four patients were reirradiated with aggressive palliation and received 45 Gy in 30 fractions over 26 days including a break in the third week. The remaining two patients were treated with palliative intent to 30 Gy in 20 fractions over twelve days. Eight patients were treated for recurrent/persistent or second carcinomas, one for a recurrent glomus jugulare tumor. At a median follow-up of 36 months, ranging from six to 61 months, nine of ten patients experienced excellent symptomatic relief. Five patients are alive and free of tumor, one patient is alive with distant metastases, and two each are dead from local or systemic tumor progression. All four patients retreated for cure are alive with no evidence of local disease. The tolerance and tumor control rate of the BID reirradition schedule were good with severe late sequelae in only one patient. (orig.) [de

  7. Impacts of fuel oil substitution by natural gas in a pipeline network scheduling; Impactos da substituicao do oleo combustivel por gas natural na programacao de uma rede de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Souza Filho, Erito M.; Bahiense, Laura; Ferreira Filho, Virgilio J.M. [Coordenacao dos Programas de Pos-Graduacao de Engenharia (COPPE/UFRJ), RJ (Brazil)

    2012-07-01

    In recent decades, due to the advancement and computational methods for solving optimization problems, the number of articles addressing the scheduling of products has grown. The mathematical models developed have proved useful to schedule from a single pipeline with multiple products to complex networks of multiple pipelines. Moreover, the planning of these activities is of even greater importance when considering the existence of new environmental requirements to be applied to production and marketing of petroleum products. An example of this paradigm shift is the reduction in fuel oil consumption due to increased share of natural gas in the Brazilian energy matrix. In this context, this paper proposes a mathematical model to obtain feasible solutions for problems of scheduling a network of pipelines considering replacing all or part of the demand for fuel oil to natural gas. We tested the model on three real instances of a multi commodity network consists of 4 terminals, 4 refineries and 8 unidirectional pipelines, considering a planning horizon of one week. (author)

  8. Applying mathematical models to predict resident physician performance and alertness on traditional and novel work schedules.

    Science.gov (United States)

    Klerman, Elizabeth B; Beckett, Scott A; Landrigan, Christopher P

    2016-09-13

    In 2011 the U.S. Accreditation Council for Graduate Medical Education began limiting first year resident physicians (interns) to shifts of ≤16 consecutive hours. Controversy persists regarding the effectiveness of this policy for reducing errors and accidents while promoting education and patient care. Using a mathematical model of the effects of circadian rhythms and length of time awake on objective performance and subjective alertness, we quantitatively compared predictions for traditional intern schedules to those that limit work to ≤ 16 consecutive hours. We simulated two traditional schedules and three novel schedules using the mathematical model. The traditional schedules had extended duration work shifts (≥24 h) with overnight work shifts every second shift (including every third night, Q3) or every third shift (including every fourth night, Q4) night; the novel schedules had two different cross-cover (XC) night team schedules (XC-V1 and XC-V2) and a Rapid Cycle Rotation (RCR) schedule. Predicted objective performance and subjective alertness for each work shift were computed for each individual's schedule within a team and then combined for the team as a whole. Our primary outcome was the amount of time within a work shift during which a team's model-predicted objective performance and subjective alertness were lower than that expected after 16 or 24 h of continuous wake in an otherwise rested individual. The model predicted fewer hours with poor performance and alertness, especially during night-time work hours, for all three novel schedules than for either the traditional Q3 or Q4 schedules. Three proposed schedules that eliminate extended shifts may improve performance and alertness compared with traditional Q3 or Q4 schedules. Predicted times of worse performance and alertness were at night, which is also a time when supervision of trainees is lower. Mathematical modeling provides a quantitative comparison approach with potential to aid

  9. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  10. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  11. Application of Tabu Search Algorithm in Job Shop Scheduling

    Directory of Open Access Journals (Sweden)

    Betrianis Betrianis

    2010-10-01

    Full Text Available Tabu Search is one of local search methods which is used to solve the combinatorial optimization problem. This method aimed is to make the searching process of the best solution in a complex combinatorial optimization problem(np hard, ex : job shop scheduling problem, became more effective, in a less computational time but with no guarantee to optimum solution.In this paper, tabu search is used to solve the job shop scheduling problem consists of 3 (three cases, which is ordering package of September, October and November with objective of minimizing makespan (Cmax. For each ordering package, there is a combination for initial solution and tabu list length. These result then  compared with 4 (four other methods using basic dispatching rules such as Shortest Processing Time (SPT, Earliest Due Date (EDD, Most Work Remaining (MWKR dan First Come First Served (FCFS. Scheduling used Tabu Search Algorithm is sensitive for variables changes and gives makespan shorter than scheduling used by other four methods.

  12. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  13. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  14. 38 CFR 4.116 - Schedule of ratings-gynecological conditions and disorders of the breast.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2010-07-01 2010-07-01 false Schedule of ratings-gynecological conditions and disorders of the breast. 4.116 Section 4.116 Pensions, Bonuses, and Veterans... wearing of pad 100 Vaginal fecal leakage four or more times per week, but less than daily, requiring...

  15. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  16. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    resources and to reduce the costs of communication. Planning and scheduling is generally a heavy consumer of time, memory and energy resources. This means careful thought must be given to how much planning and scheduling should be done on the sensors themselves, and how much to do elsewhere. The difficulty of planning and scheduling is exacerbated when reasoning about uncertainty. More time, memory and energy is needed to solve such problems, leading either to more expensive sensors, or suboptimal plans. For example, scientifically interesting events may happen at random times, making it difficult to ensure that sufficient resources are availanble. Since uncertainty is usually lowest in proximity to the sensors themselves, this argues for planning and scheduling onboard the sensors. However, cost minimization dictates sensors be kept as simple as possible, reducing the amount of planning and scheduling they can do themselves. Furthermore, coordinating each sensor's independent plans can be difficult. In the full presentation, we will critically review the planning and scheduling systems used by previously fielded sensor networks. We do so primarily from the perspective of the computational sciences, with a focus on taming computational complexity when operating sensor networks. The case studies are derived from sensor networks based on UAVs, satellites, and planetary rovers. Planning and scheduling considerations include multi-sensor coordination, optimizing science value, onboard power management, onboard memory, planning movement actions to acquire data, and managing communications.These case studies offer lessons for future designs of environmental sensor networks.

  17. Scheduling Diet for Diabetes Mellitus Patients using Genetic Algorithm

    Science.gov (United States)

    Syahputra, M. F.; Felicia, V.; Rahmat, R. F.; Budiarto, R.

    2017-01-01

    Diabetes Melitus (DM) is one of metabolic diseases which affects on productivity and lowers the human resources quality. This disease can be controlled by maintaining and regulating balanced and healthy lifestyle especially for daily diet. However, nowadays, there is no system able to help DM patient to get any information of proper diet. Therefore, an approach is required to provide scheduling diet every day in a week with appropriate nutrition for DM patients to help them regulate their daily diet for healing this disease. In this research, we calculate the number of caloric needs using Harris-Benedict equation and propose genetic algorithm for scheduling diet for DM patient. The results show that the greater the number of individuals, the greater the more the possibility of changes in fitness score approaches the best fitness score. Moreover, the greater the created generation, the more the opportunites to obtain best individual with fitness score approaching 0 or equal to 0.

  18. Stage, tumor growth rate and optimal dose fractionation schedules in the treatment of squamous cell carcinoma of the head and neck

    International Nuclear Information System (INIS)

    Sugawara, Tadashi; Morita, Mamoru; Aihara, Toshinori; Tanaka, Osamu

    1983-01-01

    In 77 patients with cancer of the head and neck, 45 patients received radiotherapy alone, while 32 patients with T 1 or T 2 glottic cancer received combined therapy with laryngomicrosurgery performed prior to or during the course of irradiation. These T 1 and T 2 groups were separately analyzed from other T 1 and T 2 groups as T sub(LMS). Local recurrence rates were compared concerning overall time and fraction size in following three subgroups, i.e., T sub(LMS), Tsub(1+2), and Tsub(3+4). No significant correlation was detected between total dose converted to partial tolerance (PT) and local control in all subgroups except for Tsub(3+4), in which local recurrence rate was rather higher in high PT range. Local control was significantly dependent on overall treatment time and fraction size, differently by tumor stage. Favorable fractionation schedules considered as optimal for T sub(LMS) were those in which treatment was given 5 times weekly with a daily dose rate more than 196 rad in a shorter overall time of less than 42 days. In contrast to T sub(LMS), effective schedules for Tsub(3+4) consisted of longer overall time of more than 60 days and a lower daily dose rate of less than 153 rad. In Tsub(1+2), the optimal schedule was needed to be altered according to rapidness of progression of disease characterised by duration of the complaints, which was statistically proved to be significantly shorter in Tsub(1+2) than Tsub(3+4). Rapidity-adjusted schedule consisted of a shorter over-all time of less than 49 days with a daily dose rate of more than 175 rad 5 fractions a week for a case having a duration of complaints of less than 2.9 months, and a longer overall time of more than 50 days with a daily dose rate of less than 174 rad for a case having a duration of more than 3 months. (J.P.N.)

  19. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  20. Using multiple schedules during functional communication training to promote rapid transfer of treatment effects.

    Science.gov (United States)

    Fisher, Wayne W; Greer, Brian D; Fuhrman, Ashley M; Querim, Angie C

    2015-12-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and therapists. With 2 children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. © Society for the Experimental Analysis of Behavior.

  1. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  2. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  3. An investigation on impacts of scheduling configurations on Mississippi biology subject area testing

    Science.gov (United States)

    Marchette, Frances Lenora

    The purpose of this mixed modal study was to compare the results of Biology Subject Area mean scores of students on a 4 x 4 block schedule, A/B block schedule, and traditional year-long schedule for 1A to 5A size schools. This study also reviewed the data to determine if minority or gender issues might influence the test results. Interviews with administrators and teachers were conducted about the type of schedule configuration they use and the influence that the schedule has on student academic performance on the Biology Subject Area Test. Additionally, this research further explored whether schedule configurations allow sufficient time for students to construct knowledge. This study is important to schools, teachers, and administrators because it can assist them in considering the impacts that different types of class schedules have on student performance and if ethnic or gender issues are influencing testing results. This study used the causal-comparative method for the quantitative portion of the study and constant comparative method for the qualitative portion to explore the relationship of school schedules on student academic achievement on the Mississippi Biology Subject Area Test. The aggregate means of selected student scores indicate that the Mississippi Biology Subject Area Test as a measure of student performance reveals no significant difference on student achievement for the three school schedule configurations. The data were adjusted for initial differences of gender, minority, and school size on the three schedule configurations. The results suggest that schools may employ various schedule configurations and expect student performance on the Mississippi Biology Subject Area Test to be unaffected. However, many areas of concern were identified in the interviews that might impact on school learning environments. These concerns relate to effective classroom management, the active involvement of students in learning, the adequacy of teacher education

  4. Assessment of placental volume and vascularization at 11-14 weeks of gestation in a Taiwanese population using three-dimensional power Doppler ultrasound.

    Science.gov (United States)

    Wang, Hsing-I; Yang, Ming-Jie; Wang, Peng-Hui; Wu, Yi-Cheng; Chen, Chih-Yao

    2014-12-01

    The placental volume and vascular indices are crucial in helping doctors to evaluate early fetal growth and development. Inadequate placental volume or vascularity might indicate poor fetal growth or gestational complications. This study aimed to evaluate the placental volume and vascular indices during the period of 11-14 weeks of gestation in a Taiwanese population. From June 2006 to September 2009, three-dimensional power Doppler ultrasound was performed in 222 normal pregnancies from 11-14 weeks of gestation. Power Doppler ultrasound was applied to the placenta and the placental volume was obtained by a rotational technique (VOCAL). The three-dimensional power histogram was used to assess the placental vascular indices, including the mean gray value, the vascularization index, the flow index, and the vascularization flow index. The placental vascular indices were then plotted against gestational age (GA) and placental volume. Our results showed that the linear regression equation for placental volume using gestational week as the independent variable was placental volume = 18.852 × GA - 180.89 (r = 0.481, p power Doppler ultrasonography showed a constant distribution throughout gestation. Copyright © 2014. Published by Elsevier Taiwan.

  5. PROCTITIS ONE WEEK AFTER STEREOTACTIC BODY RADIATION THERAPY FOR PROSTATE CANCER: IMPLICATIONS FOR CLINICAL TRIAL DESIGN

    Directory of Open Access Journals (Sweden)

    Ima Paydar

    2016-07-01

    Full Text Available Background: Proctitis following prostate cancer radiation therapy is a primary determinant of quality of life (QOL. While previous studies have assessed acute rectal morbidity at 1 month after stereotactic body radiotherapy (SBRT, little data exist on the prevalence and severity of rectal morbidity within the first week following treatment. This study reports the acute bowel morbidity one week following prostate SBRT. Materials and methods: Between May 2013 and August 2014, 103 patients with clinically localized prostate cancer were treated with 35 to 36.25 Gy in five fractions using robotic SBRT delivered on a prospective clinical trial. Bowel toxicity was graded using the Common Terminology Criteria for Adverse Events version 4.0 (CTCAEv.4. Bowel QOL was assessed using EPIC-26 questionnaire bowel domain at baseline, one week, one month, and three months. Time-dependent changes in bowel symptoms were statistically compared using the Wilcoxon signed-rank test. Clinically significant change was assessed by the minimally important difference (MID in EPIC score. This was defined as a change of one-half standard deviation (SD from the baseline score. Results: One hundred and three patients with a minimum of three months of follow-up were analyzed. The cumulative incidence of acute grade 2 GI toxicity was 23%. There were no acute ≥ grade 3 bowel toxicities. EPIC bowel summary scores maximally declined at 1 week after SBRT (-13.9, p<0.0001 before returning to baseline at three months after SBRT (+0.03, p=0.94. Prior to treatment, 4.9% of men reported that their bowel bother was a moderate to big problem. This increased to 28.4% (p<0.0001 one week after SBRT and returned to baseline at three months after SBRT (0.0%, p=0.66. Only the bowel summary and bowel bother score declines at 1 week met the MID threshold for clinically significant change. Conclusion: The rate and severity of acute proctitis following prostate SBRT peaked at one week after

  6. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  7. 78 FR 61991 - Schedules of Controlled Substances: Temporary Placement of Three Synthetic Phenethylamines Into...

    Science.gov (United States)

    2013-10-10

    ... 202 of the CSA, 21 U.S.C. 812, or if there is no exemption or approval in effect under section 505 of... the last 10 years for use in mapping and investigating the serotonin receptors in the mammalian brain..., and 25B-NBOMe are often purported to be Schedule I hallucinogens like lysergic acid diethylamide (LSD...

  8. Validation of probabilistic methodology for generating actual inhabitants' behavior schedules for accurate prediction of maximum energy requirements

    Energy Technology Data Exchange (ETDEWEB)

    Tanimoto, Jun; Hagishima, Aya; Sagara, Hiroki [Interdisciplinary Graduate School of Engineering Sciences, Kyushu University 6-1, Kasuga-koen, Kasuga-shi, Fukuoka 816-8580 (Japan)

    2008-07-01

    A data set of myriad and time-varying inhabitant-behavior schedules with a 15 min time resolution, generated by the authors in a previous study, is validated through a comparison analysis. We show three comparisons. The first and second compare the estimated demand with a time series of actual utility demand. The comparisons indicate that the generated data and its algorithm, described by the authors, have an appropriate robustness. Another comparison between the estimate and the annual averaged daily water demand of a residential area, consisting of 9327 residences, also shows an acceptable consistency. (author)

  9. An Entropy-Based Upper Bound Methodology for Robust Predictive Multi-Mode RCPSP Schedules

    Directory of Open Access Journals (Sweden)

    Angela Hsiang-Ling Chen

    2014-09-01

    Full Text Available Projects are an important part of our activities and regardless of their magnitude, scheduling is at the very core of every project. In an ideal world makespan minimization, which is the most commonly sought objective, would give us an advantage. However, every time we execute a project we have to deal with uncertainty; part of it coming from known sources and part remaining unknown until it affects us. For this reason, it is much more practical to focus on making our schedules robust, capable of handling uncertainty, and even to determine a range in which the project could be completed. In this paper we focus on an approach to determine such a range for the Multi-mode Resource Constrained Project Scheduling Problem (MRCPSP, a widely researched, NP-complete problem, but without adding any subjective considerations to its estimation. We do this by using a concept well known in the domain of thermodynamics, entropy and a three-stage approach. First we use Artificial Bee Colony (ABC—an effective and powerful meta-heuristic—to determine a schedule with minimized makespan which serves as a lower bound. The second stage defines buffer times and creates an upper bound makespan using an entropy function, with the advantage over other methods that it only considers elements which are inherent to the schedule itself and does not introduce any subjectivity to the buffer time generation. In the last stage, we use the ABC algorithm with an objective function that seeks to maximize robustness while staying within the makespan boundaries defined previously and in some cases even below the lower boundary. We evaluate our approach with two different benchmarks sets: when using the PSPLIB for the MRCPSP benchmark set, the computational results indicate that it is possible to generate robust schedules which generally result in an increase of less than 10% of the best known solutions while increasing the robustness in at least 20% for practically every

  10. Prevalence of the β(S) gene among scheduled castes, scheduled tribes and other backward class groups in Central India.

    Science.gov (United States)

    Shrikhande, Anuradha V; Arjunan, Aishwarya; Agarwal, Amit; Dani, Aarti; Tijare, Jayashri; Gettig, Elizabeth; Krishnamurti, Lakshmanan

    2014-01-01

    Sickle cell disease is an inherited disorder of the blood, and characterized by vasoocclusive crises (VOC), risks for pneumococcal infections and organ toxicities, is associated with morbidity and premature mortality. India, with a population of 1.2 billion individuals, is estimated to be home to over 50.0% of the world's patients with sickle cell disease. The β(S) gene [β6(A3)Glu→Val; HBB: c.20A>T] has the highest prevalence in three socio-economically disadvantaged ethnic categories: the Scheduled Castes (SC), the Scheduled Tribes (ST), and Other Backward Class (OBC) groups in India. The tradition of endogamy practiced by the ethnic groups in India provides the rationale for the screening of individual populations to better understand the distribution of the β(S) gene, guide counseling and awareness programs and aid development of public policy. We undertook a study to describe the prevalence of the β(S) gene in these ethnic groups in the district of Nagpur, Maharashtra in Central India. Through community screening and subsequent targeted screening of high risk individuals, 35,636 individuals were screened, of whom 5466 were found to have sickle cell trait and 1010 were identified with sickle cell disease. Community screening revealed a sickle cell trait prevalence of 13.0% in the SC, 12.0% in the ST and 3.4% in the OBC population. This study describes the prevalence of the β(S) gene within these groups in Central India determined by large scale community screening. This program has uncovered previously undiagnosed cases, provided detailed information to guide population-based disease counseling, prevention and comprehensive care programs.

  11. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  12. Impact of flexible scheduling on employee performance regarding stress and work-family conflict

    OpenAIRE

    Raja Abdul Ghafoor Khan; Furqan Ahmad Khan; Dr. Muhammad Aslam Khan; Mohsin Shakeel

    2011-01-01

    Stress, work-family conflicts and flexible scheduling are three of the most important elements in organizational studies. The focus of current study is to understand the effect of Stress,work family conflicts and flexible scheduling on employee’s performance and also to understand whether flexible scheduling helps in reducing stress and work-family conflicts or not. The back bone of this study is the secondary data comprised of comprehensive literature review. A survey has also been conducted...

  13. Real-time energy resources scheduling considering short-term and very short-term wind forecast

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Marco; Sousa, Tiago; Morais, Hugo; Vale, Zita [Polytechnic of Porto (Portugal). GECAD - Knowledge Engineering and Decision Support Research Center

    2012-07-01

    This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process the update of generation and consumption operation and of the storage and electric vehicles storage status are used. Besides the new operation conditions, the most accurate forecast values of wind generation and of consumption using results of short-term and very short-term methods are used. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented. (orig.)

  14. Static Scheduling of Periodic Hardware Tasks with Precedence and Deadline Constraints on Reconfigurable Hardware Devices

    Directory of Open Access Journals (Sweden)

    Ikbel Belaid

    2011-01-01

    Full Text Available Task graph scheduling for reconfigurable hardware devices can be defined as finding a schedule for a set of periodic tasks with precedence, dependence, and deadline constraints as well as their optimal allocations on the available heterogeneous hardware resources. This paper proposes a new methodology comprising three main stages. Using these three main stages, dynamic partial reconfiguration and mixed integer programming, pipelined scheduling and efficient placement are achieved and enable parallel computing of the task graph on the reconfigurable devices by optimizing placement/scheduling quality. Experiments on an application of heterogeneous hardware tasks demonstrate an improvement of resource utilization of 12.45% of the available reconfigurable resources corresponding to a resource gain of 17.3% compared to a static design. The configuration overhead is reduced to 2% of the total running time. Due to pipelined scheduling, the task graph spanning is minimized by 4% compared to sequential execution of the graph.

  15. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  16. Associations Among Work and Family Health Climate, Health Behaviors, Work Schedule, and Body Weight.

    Science.gov (United States)

    Buden, Jennifer C; Dugan, Alicia G; Faghri, Pouran D; Huedo-Medina, Tania B; Namazi, Sara; Cherniack, Martin G

    2017-06-01

    Correctional employees exhibit elevated obesity rates. This study examines interrelations among health behaviors, health climate, body mass index (BMI), and work schedule. Using survey results from correctional supervisors (n = 157), mediation and moderated-mediation analyses were performed to examine how health behaviors explain relationships between obesity, work health climate (WHC) and family health climate (FHC), and work schedule. Over 85% of the sample was overweight/obese (mean BMI = 30.20). Higher WHC and FHC were associated with lower BMI, mediated by nutrition, and physical activity. The interaction effect between health behavior and work schedule revealed a protective effect on BMI. Overtime shift work may share a relationship with BMI. Findings may have implications for reexamining organizational policies on maximum weekly overtime in corrections. They provide direction for targeted obesity interventions that encourage a supportive FHC and promote healthy behaviors among supervisors working overtime.

  17. Associations among Work and Family Health Climate, Health Behaviors, Work Schedule and Body Weight

    Science.gov (United States)

    Buden, Jennifer C.; Dugan, Alicia G.; Faghri, Pouran D.; Huedo-Medina, Tania B.; Namazi, Sara; Cherniack, Martin G.

    2017-01-01

    Objectives Correctional employees exhibit elevated obesity rates. This study examines interrelations among health behaviors, health climate, BMI, and work schedule. Methods Using survey results from correctional supervisors (n=157), mediation and moderated-mediation analyses were performed to examine how health behaviors explain relationships between obesity, work health climate (WHC) and family health climate (FHC), and work schedule. Results Over 85% of the sample was overweight/obese (mean BMI=30.20). Higher WHC and FHC were associated with lower BMI, mediated by nutrition and physical activity. The interaction effect between health behavior and work schedule revealed a protective effect on BMI. Overtime shiftwork may share a relationship with BMI. Conclusions Findings may have implications for reexamining organizational policies on maximum weekly overtime in corrections. They provide direction for targeted obesity interventions that encourage a supportive FHC and promote healthy behaviors among supervisors working overtime. PMID:28471768

  18. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling - abstract

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  19. Scheduling double round-robin tournaments with divisional play using constraint programming

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Mats; Johansson, Mikael; Larson, Jeffrey

    2017-06-01

    We study a tournament format that extends a traditional double round-robin format with divisional single round-robin tournaments. Elitserien, the top Swedish handball league, uses such a format for its league schedule. We present a constraint programming model that characterizes the general double round-robin plus divisional single round-robin format. This integrated model allows scheduling to be performed in a single step, as opposed to common multistep approaches that decompose scheduling into smaller problems and possibly miss optimal solutions. In addition to general constraints, we introduce Elitserien-specific requirements for its tournament. These general and league-specific constraints allow us to identify implicit and symmetry-breaking properties that reduce the time to solution from hours to seconds. A scalability study of the number of teams shows that our approach is reasonably fast for even larger league sizes. The experimental evaluation of the integrated approach takes considerably less computational effort to schedule Elitserien than does the previous decomposed approach. (C) 2016 Elsevier B.V. All rights reserved

  20. On the road to improved scheduling – Fitting activities to capacity

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    Last Planner System has through the sounding process increased the reliability of the schedule. The sound activities are moved to a buffer and afterwards selected to the Weekly Work Plans to match capacity. Therefore, in order to maximise productivity it is essential to ensure that the sounding p...... be introduced to absorb the effect. This is achieved by introducing slack at the critical path and supplementing it with buffers of “time” flexible activities....

  1. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  2. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  3. Sleep scheduling with expected common coverage in wireless sensor networks

    OpenAIRE

    Bulut, Eyuphan; Korpeoglu, Ibrahim

    2011-01-01

    Sleep scheduling, which is putting some sensor nodes into sleep mode without harming network functionality, is a common method to reduce energy consumption in dense wireless sensor networks. This paper proposes a distributed and energy efficient sleep scheduling and routing scheme that can be used to extend the lifetime of a sensor network while maintaining a user defined coverage and connectivity. The scheme can activate and deactivate the three basic units of a sensor node (sensing, proces...

  4. A Study Comparing Typewriting Achievement of Students Attending Class Three and Five Days a Week in Beginning Typewriting at the Community College Level. Final Report.

    Science.gov (United States)

    Ziemer, Adelle W.

    The purpose of this study was to determine (1) whether beginning typewriting on the community college level should be taught in a five-day-a-week pattern or in a reduced three-day-a-week pattern; (2) what, if any, relationship existed between the achievement level in beginning college typewriting and the following student characteristics: Locus of…

  5. Web-Based Requesting and Scheduling Use of Facilities

    Science.gov (United States)

    Yeager, Carolyn M.

    2010-01-01

    Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

  6. Interruption of scheduled, automatic feeding and reduction of excess energy intake in toddlers.

    Science.gov (United States)

    Ciampolini, Mario; Brenna, J Thomas; Giannellini, Valerio; Bini, Stefania

    2013-01-01

    Childhood obesity due to the consumption of excess calories is a severe problem in developed countries. In a previous investigation on toddlers, hospital laboratory measurements showed an association of food-demand behavior with constant lower blood glucose before meals than for scheduled meals. We hypothesize that maternal scheduling of meals for toddlers results in excess energy intake compared to feeding only on demand (previously "on request"). We tested the cross-sectional null hypothesis of no difference in energy intake between scheduled (automatic) and demanded meals (administered after evaluation) in 24 mother-toddler (21 months old at entry) pairs with chronic, nonspecific diarrhea presenting at a clinic. We tested the same hypothesis in a subset of 14 toddlers by measuring the resting (sleeping) metabolic rate 4 hours after lunch, as well as the total daily energy expenditure (TEE) in 10 toddlers. We trained mothers to recognize meal demands (as in the previous investigation) and to provide food in response, but required no blood glucose measurements before meals. Energy intake was assessed by a 10-day food diary, resting metabolic rate (RMR) by respiratory analyses (indirect calorimetry) in 14 toddlers, and TEE by doubly labeled water in 10 toddlers. Their blood parameters, anthropometry, and number of days with diarrhea were assessed before training and 50 days after training. RMR decreased from 58.6 ± 7.8 to 49.0 ± 9.1 kcal/kg/d (P kcal/kg/d (P kcal/kg/d (P < 0.001). The height Z-score increased significantly, while weight growth was normal. Toddlers entering the study over the median RMR decreased their RMR significantly more than those below the median RMR (P < 0.01). Scheduled meal suspension induces meal demand frequency to increase. Demanded meals are associated with significantly lower energy intake, RMR, and TEE than scheduled meals. Feeding on demand may be an effective skill in a strategy for reducing excess energy intake in the long term

  7. Resource-constrained project scheduling problem: review of past and recent developments

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  8. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  9. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  10. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  11. TAGUCHI METHOD FOR THREE-STAGE ASSEMBLY FLOW SHOP SCHEDULING PROBLEM WITH BLOCKING AND SEQUENCE-DEPENDENT SET UP TIMES

    Directory of Open Access Journals (Sweden)

    AREF MALEKI-DARONKOLAEI

    2013-10-01

    Full Text Available This article considers a three-stage assembly flowshop scheduling problem minimizing the weighted sum of mean completion time and makespan with sequence-dependent setup times at the first stage and blocking times between each stage. To tackle such an NP-hard, two meta-heuristic algorithms are presented. The novelty of our approach is to develop a variable neighborhood search algorithm (VNS and a well-known simulated annealing (SA for the problem. Furthermore, to enhance the performance of the (SA, its parameters are optimized by the use of Taguchi method, but to setting parameters of VNS just one parameter has been used without Taguchi. The computational results show that the proposed VNS is better in mean and standard deviation for all sizes of the problem than SA, but on the contrary about CPU Time SA outperforms VNS.

  12. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  13. Benfotiamine in the treatment of diabetic polyneuropathy--a three-week randomized, controlled pilot study (BEDIP study).

    Science.gov (United States)

    Haupt, E; Ledermann, H; Köpcke, W

    2005-02-01

    The aim of the study was to evaluate the efficacy of benfotiamine administered over three weeks (allithiamine; a lipid-soluble vitamin B1 prodrug with high bioavailability) to patients with diabetic polyneuropathy in a randomized, placebo-controlled, double-blind, two-center pilot study. Forty inpatients (23 male, 18 female, age range 18 - 70 years) with a history of type 1 or 2 diabetes and polyneuropathy of not longer than two years, were included in the study. Twenty Patients received two 50 mg benfotiamine tablets four times daily and 20 patients received placebo over the three-week study period. Two clinical units were involved with 10 patients receiving placebo and 10 patients benfotiamine in each. The neuropathy score according to Katzenwadel et al. [1987] was used to evaluate symptoms of polyneuropathy, vibration perception threshold and both the physician's and the patient's own assessment were documented. A statistically significant (p = 0.0287) improvement in the neuropathy score was observed in the group given active drug when compared to the placebo-treated controls. There was no statistically significant change observed in the tuning fork test. The most pronounced effect on complaints was a decrease in pain (p = 0.0414). More patients in the benfotiamine-treated group than in the placebo group considered their clinical condition to have improved (p = 0.052). No side effects attributable to benfotiamine were observed. The differences between the groups cannot be attributed to a change in metabolic parameters since there were no significant alterations in the HbA1 levels and blood sugar profiles. The body mass index of the two groups did not differ. This pilot investigation (BEDIP Study) has confirmed the results of two earlier randomized controlled trials and has provided further evidence for the beneficial effects of benfotiamine in patients with diabetic neuropathy.

  14. Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics

    OpenAIRE

    Pérez González, Paz; Framiñán Torres, José Manuel

    2009-01-01

    In this paper, we address the problem of scheduling a set of jobs in a flowshop with makespan objective. In contrast to the usual assumption of machine availability presented in most research, we consider that machines may not be available at the beginning of the planning period, due to processing of previously scheduled jobs. We first formulate the problem, analyse the structure of solutions depending on a number of factors (such as machines, jobs, structure of the processing times, availabi...

  15. Scheduling models in farm management : a new approach

    NARCIS (Netherlands)

    Wijngaard, P.J.M.

    1988-01-01

    Three operational planning models to calculate schedules for an arable farm are examined. These models are a linear programming model, a dynamic programming model and a simulation model. They are examined at different levels of aggregation and relaxation in a retrospective way. Also a

  16. Golimumab in patients with active rheumatoid arthritis who have previous experience with tumour necrosis factor inhibitors: results of a long-term extension of the randomised, double-blind, placebo-controlled GO-AFTER study through week 160

    NARCIS (Netherlands)

    Smolen, Josef S.; Kay, Jonathan; Landewé, Robert B. M.; Matteson, Eric L.; Gaylis, Norman; Wollenhaupt, Jurgen; Murphy, Frederick T.; Zhou, Yiying; Hsia, Elizabeth C.; Doyle, Mittie K.

    2012-01-01

    The aim of this study was to assess long-term golimumab therapy in patients with rheumatoid arthritis (RA) who discontinued previous tumour necrosis factor alpha (TNFα) inhibitor(s) for any reason. Results through week 24 of this multicentre, randomised, double-blind, placebo-controlled study of

  17. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    Science.gov (United States)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  18. Ruptured Rudimentary Horn Pregnancy at 25 Weeks with Previous Vaginal Delivery: A Case Report

    Directory of Open Access Journals (Sweden)

    Deepa V. Kanagal

    2012-01-01

    Full Text Available Unicornuate uterus with rudimentary horn occurs due to failure of complete development of one of the Mullerian ducts and incomplete fusion with the contralateral side. Pregnancy in a noncommunicating rudimentary horn is extremely rare and usually terminates in rupture during first or second trimester of pregnancy. Diagnosis of rudimentary horn pregnancy and its rupture in a woman with prior vaginal delivery is difficult. It can be missed in routine ultrasound scan and in majority of cases it is detected after rupture. It requires a high index of suspicion. We report a case of G2PlL1 with rupture rudimentary horn pregnancy at 25 weeks of gestation which was misdiagnosed as intrauterine pregnancy with fetal demise by ultrasound, and termination was attempted and the case was later referred to our hospital after the patient developed hemoperitoneum and shock with a diagnosis of rupture uterus. Laparotomy revealed rupture of right rudimentary horn pregnancy with massive hemoperitoneum. Timely laparotomy, excision of the horn, and blood transfusion saved the patient.

  19. The ATLAS Glasgow Overview Week

    CERN Multimedia

    Richard Hawkings

    2007-01-01

    The ATLAS Overview Weeks always provide a good opportunity to see the status and progress throughout the experiment, and the July week at Glasgow University was no exception. The setting, amidst the traditional buildings of one of the UK's oldest universities, provided a nice counterpoint to all the cutting-edge research and technology being discussed. And despite predictions to the contrary, the weather at these northern latitudes was actually a great improvement on the previous few weeks in Geneva. The meeting sessions comprehensively covered the whole ATLAS project, from the subdetector and TDAQ systems and their commissioning, through to offline computing, analysis and physics. As a long-time ATLAS member who remembers plenary meetings in 1991 with 30 people drawing detector layouts on a whiteboard, the hardware and installation sessions were particularly impressive - to see how these dreams have been translated into 7000 tons of reality (and with attendant cabling, supports and services, which certainly...

  20. Effects on quality of life, anti-cancer responses, breast conserving surgery and survival with neoadjuvant docetaxel: a randomised study of sequential weekly versus three-weekly docetaxel following neoadjuvant doxorubicin and cyclophosphamide in women with primary breast cancer

    Directory of Open Access Journals (Sweden)

    Wiseman Janice

    2011-05-01

    Full Text Available Abstract Background Weekly docetaxel has occasionally been used in the neoadjuvant to downstage breast cancer to reduce toxicity and possibly enhance quality of life. However, no studies have compared the standard three weekly regimen to the weekly regimen in terms of quality of life. The primary aim of our study was to compare the effects on QoL of weekly versus 3-weekly sequential neoadjuvant docetaxel. Secondary aims were to determine the clinical and pathological responses, incidence of Breast Conserving Surgery (BCS, Disease Free Survival (DFS and Overall Survival (OS. Methods Eighty-nine patients receiving four cycles of doxorubicin and cyclophosphamide were randomised to receive twelve cycles of weekly docetaxel (33 mg/m2 or four cycles of 3-weekly docetaxel (100 mg/m2. The Functional Assessment of Cancer Therapy-Breast and psychosocial questionnaires were completed. Results At a median follow-up of 71.5 months, there was no difference in the Trial Outcome Index scores between treatment groups. During weekly docetaxel, patients experienced less constipation, nail problems, neuropathy, tiredness, distress, depressed mood, and unhappiness. There were no differences in overall clinical response (93% vs. 90%, pathological complete response (20% vs. 27%, and breast-conserving surgery (BCS rates (49% vs. 42%. Disease-free survival and overall survival were similar between treatment groups. Conclusions Weekly docetaxel is well-tolerated and has less distressing side-effects, without compromising therapeutic responses, Breast Conserving Surgery (BCS or survival outcomes in the neoadjuvant setting. Trial registration ISRCTN: ISRCTN09184069

  1. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  2. A randomized trial comparing hypofractionated and conventionally fractionated three-dimensional external-beam radiotherapy for localized prostate adenocarcinoma. A report on acute toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Norkus, Darius; Miller, Albert; Kurtinaitis, Juozas; Valuckas, Konstantinas Povilas [Dept. of Radiotherapy, Inst. of Oncology, Vilnius Univ. (Lithuania); Haverkamp, Uwe [Dept. of Radiology, Clemenshospital, Muenster (Germany); Popov, Sergey [Dept. of Radiotherapy, Riga Eastern Hospital, Latvian Oncology Center, Riga (Latvia); Prott, Franz-Josef [Inst. of Radiology and Radiotherapy (RNS), St. Josefs Hospital, Wiesbaden (Germany)

    2009-11-15

    Purpose: to compare acute gastrointestinal (GI) and genitourinary (GU) toxicity between patient groups with localized prostate adenocarcinoma, treated with conventionally fractionated (CFRT) and hypofractionated (HFRT) three-dimensional conformal external-beam radiotherapy (3D-CRT). Patients and methods: 91 patients were enrolled into a randomized study with a minimum follow-up of 3 months. 44 men in the CFRT arm were irradiated with 74 Gy in 37 fractions at 2 Gy per fraction for 7.5 weeks. 47 men in the HFRT arm were treated with 57 Gy in 17 fractions for 3.5 weeks, given as 13 fractions of 3 Gy plus four fractions of 4.5 Gy. The clinical target volume (CTV) included the prostate and the base of seminal vesicles. The CTV-to-PTV (planning target volume) margin was 8-10 mm. Study patients had portal imaging and/or simulation performed on the first fractions and repeated at least weekly. Results: no acute grade 3 or 4 toxicities were observed. The grade 2 GU acute toxicity proportion was significantly lower in the HFRT arm: 19.1% versus 47.7% ({chi}{sup 2}-test, p = 0.003). The grade 2 GU acute toxicity-free survival was significantly better in the HFRT arm (log-rank test, p = 0.008). The median duration of overall GI acute toxicity was shorter with HFRT: 3 compared to 6 weeks with CFRT (median test, p = 0.017). Conclusion: in this first evaluation, the HFRT schedule is feasible and induces acceptable or even lower acute toxicity compared with the toxicities in the CFRT schedule. Extended follow-up is needed to justify this fractionation schedule's safety in the long term. (orig.)

  3. Colour cues facilitate learning flower refill schedules in wild hummingbirds.

    Science.gov (United States)

    Samuels, Michael; Hurly, T Andrew; Healy, Susan D

    2014-11-01

    Free-living hummingbirds can learn the refill schedules of individual experimental flowers but little is known about what information they use to do this. Colour cues, in particular, may be important to hummingbirds when learning about rewarded flower properties. We investigated, therefore, whether colour cues facilitated the learning of flower refill schedules in wild, free-living rufous hummingbirds (Selasphorus rufus). In the Cued condition, we presented birds with an array of six flowers, three of one colour, each of which were refilled 10min after being emptied by the bird and three of a different colour, which were refilled 20min after being emptied. In the Uncued condition we presented birds with six flowers of the same colour, three of which were refilled after 10min and three of which were refilled after 20min as for the birds in the Cued condition. In the second part of the experiment, we moved the array 2m and changed the shape of the array. Across both phases, birds in the Cued condition learned to discriminate between 10 and 20-min flowers more quickly than did the birds in the Uncued condition. The Cued birds were also better at discriminating between the two distinct refill intervals. Colour cues can, therefore, facilitate learning the refill schedules of experimental flowers in these birds. This article is part of a Special Issue entitled: Cognition in the wild. Copyright © 2014 Elsevier B.V. All rights reserved.

  4. Three years of an intensive Programme

    DEFF Research Database (Denmark)

    Pedersen, Jens Myrup; Lopez, Jose Manuel Guterrez Lopez; Kirikova, Marite

    2015-01-01

    points, we can highlight the importance of clearly communicating learning goals as well as motivations for the students to work problem-based and across traditional disciplines. Also, having short time to get a group from four different universities work together it is important to actively encourage (or......-12 teachers from the 4 participating universities would meet in the location of one of the partner institutions. During the three years, the programme was each year adjusted according to the observations and evaluations from the previous year. The course was organized as a week of course modules, followed...... by a week of project work. The topics of the first week were defined to support the project work in the following week. The projects were based on real-life problems proposed by companies, and had to be solved in student groups with a mix of nationalities and educational backgrounds. Among the key learning...

  5. Blood pressure and fasting lipid changes after 24 weeks' treatment with vildagliptin: a pooled analysis in >2,000 previously drug-naïve patients with type 2 diabetes mellitus.

    Science.gov (United States)

    Evans, Marc; Schweizer, Anja; Foley, James E

    2016-01-01

    We have previously shown modest weight loss with vildagliptin treatment. Since body weight balance is associated with changes in blood pressure (BP) and fasting lipids, we have assessed these parameters following vildagliptin treatment. Data were pooled from all double-blind, randomized, controlled, vildagliptin mono-therapy trials on previously drug-naïve patients with type 2 diabetes mellitus who received vildagliptin 50 mg once daily (qd) or twice daily (bid; n=2,108) and wherein BP and fasting lipid data were obtained. Data from patients receiving vildagliptin 50 mg qd or bid showed reductions from baseline to week 24 in systolic BP (from 132.5±0.32 to 129.8±0.34 mmHg; Pvildagliptin shows a significant reduction in BP and a favorable fasting lipid profile that are associated with modest weight loss.

  6. Reusable rocket engine preventive maintenance scheduling using genetic algorithm

    International Nuclear Information System (INIS)

    Chen, Tao; Li, Jiawen; Jin, Ping; Cai, Guobiao

    2013-01-01

    This paper deals with the preventive maintenance (PM) scheduling problem of reusable rocket engine (RRE), which is different from the ordinary repairable systems, by genetic algorithm. Three types of PM activities for RRE are considered and modeled by introducing the concept of effective age. The impacts of PM on all subsystems' aging processes are evaluated based on improvement factor model. Then the reliability of engine is formulated by considering the accumulated time effect. After that, optimization model subjected to reliability constraint is developed for RRE PM scheduling at fixed interval. The optimal PM combination is obtained by minimizing the total cost in the whole life cycle for a supposed engine. Numerical investigations indicate that the subsystem's intrinsic reliability characteristic and the improvement factor of maintain operations are the most important parameters in RRE's PM scheduling management

  7. Cryptococcal meningitis in a previously healthy child | Chimowa ...

    African Journals Online (AJOL)

    An 8-year-old previously healthy female presented with a 3 weeks history of headache, neck stiffness, deafness, fever and vomiting and was diagnosed with cryptococcal meningitis. She had documented hearing loss and was referred to tertiary-level care after treatment with fluconazole did not improve her neurological ...

  8. Prophylactic treatment with a potent corticosteroid cream ameliorates radiodermatitis, independent of radiation schedule

    DEFF Research Database (Denmark)

    Ulff, Eva; Maroti, Marianne; Serup, Jörgen

    2017-01-01

    BACKGROUND AND PURPOSE: The study will test the hypothesis that preventive topical steroid treatment instituted from start of radiotherapy can ameliorate acute radiation dermatitis. Subgroups of increased risk of dermatitis are included. MATERIAL AND METHODS: A double blinded randomized trial...... of acute radiation dermatitis in breast cancer patients treated with adjuvant RT, independent of RT schedule. Preventive application of a potent corticosteroid cream should be used in the routine and instituted at the start of RT....... schedules as well as for anatomical sites, skin type, breast size and BMI. Patients treated the irradiated area during the radiation period and two weeks following cessation of radiation. RESULTS: Patients receiving hypofraction RT developed less skin reactions than those treated with conventional RT...

  9. Sleep/wake scheduling scheme for minimizing end-to-end delay in multi-hop wireless sensor networks

    OpenAIRE

    Madani Sajjad; Nazir Babar; Hasbullah Halabi

    2011-01-01

    Abstract We present a sleep/wake schedule protocol for minimizing end-to-end delay for event driven multi-hop wireless sensor networks. In contrast to generic sleep/wake scheduling schemes, our proposed algorithm performs scheduling that is dependent on traffic loads. Nodes adapt their sleep/wake schedule based on traffic loads in response to three important factors, (a) the distance of the node from the sink node, (b) the importance of the node's location from connectivity's perspective, and...

  10. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  11. An Integrated Approach to Locality-Conscious Processor Allocation and Scheduling of Mixed-Parallel Applications

    Energy Technology Data Exchange (ETDEWEB)

    Vydyanathan, Naga; Krishnamoorthy, Sriram; Sabin, Gerald M.; Catalyurek, Umit V.; Kurc, Tahsin; Sadayappan, Ponnuswamy; Saltz, Joel H.

    2009-08-01

    Complex parallel applications can often be modeled as directed acyclic graphs of coarse-grained application-tasks with dependences. These applications exhibit both task- and data-parallelism, and combining these two (also called mixedparallelism), has been shown to be an effective model for their execution. In this paper, we present an algorithm to compute the appropriate mix of task- and data-parallelism required to minimize the parallel completion time (makespan) of these applications. In other words, our algorithm determines the set of tasks that should be run concurrently and the number of processors to be allocated to each task. The processor allocation and scheduling decisions are made in an integrated manner and are based on several factors such as the structure of the taskgraph, the runtime estimates and scalability characteristics of the tasks and the inter-task data communication volumes. A locality conscious scheduling strategy is used to improve inter-task data reuse. Evaluation through simulations and actual executions of task graphs derived from real applications as well as synthetic graphs shows that our algorithm consistently generates schedules with lower makespan as compared to CPR and CPA, two previously proposed scheduling algorithms. Our algorithm also produces schedules that have lower makespan than pure taskand data-parallel schedules. For task graphs with known optimal schedules or lower bounds on the makespan, our algorithm generates schedules that are closer to the optima than other scheduling approaches.

  12. Design and implementation of two two-week Teacher Enhancement Institutes

    Science.gov (United States)

    Lambert, Lynn

    1994-01-01

    During this summer, I have been part of a four team effort that planned and executed two two-week Teacher Enhancement Institutes (TEI) for 40 K-8 teachers from this area. The TEI was designed to enhance teachers' background in aeronautics and technology so that they would be better equipped to encourage and to train students in the mathematics, science, and technology fields. The teachers were given a stipend and three graduate credits from Christopher Newport University for their participation in this program. The four ASEE fellows worked together to develop objectives and a schedule of activities for each two-week session based on the program outline given in the grants that were funding this effort. We divided the responsibilities in coordinating and implementing each part of the TEI based on the specific strengths and background of each ASEE fellow. My specific responsibilities were: (1) to develop the course syllabus and generally handle all matters involved with the graduate course; (2) coordinate the follow-up sessions; and (3) design and manage half of the technology sessions that we had scheduled (approximately 30% of the TEI was devoted to technology). Because the first two responsibilities were primarily administrative in nature, I will address only the last. The technology sessions were divided into computer-only and other technologies (e.g., television and digital technology including scanning, digital photography and CD-ROM). I had responsibility for the computer-only technology sessions. The emphasis of these sessions was on use of the Internet specifically to locate and use educational resources. To maximize learning, these sessions were hands-on with two teachers at each computer. Each teacher received instruction in, and actually used, the most popular tools available on the Internet: email (they were given temporary accounts at NASA LaRC), anonymous ftp and archie, gopher and veronica, mosaic, and telnet. Teachers participated in hands

  13. Optimizing music learning: Exploring how blocked and interleaved practice schedules affect advanced performance

    Directory of Open Access Journals (Sweden)

    Christine E Carter

    2016-08-01

    Full Text Available Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the contextual interference effect. While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (twelve minutes per piece and a second concerto exposition and technical excerpt to practice in an interleaved schedule (three minutes per piece, alternating until a total of twelve minutes of practice were completed on each piece. Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated

  14. Sustainable Sport Scheduling Approach Considering Team Equity for the Korean Professional Baseball League

    Directory of Open Access Journals (Sweden)

    Young Dae Ko

    2018-02-01

    Full Text Available Since the Korea Baseball League (KBL had nine teams, an odd number, in the 2013 season, one team was unable to compete at certain times in the rotation while the other eight teams played games. Therefore, it was necessary to consider several elements to generate an annual match schedule in terms of team equity. However, the annual match schedule created by the conventional method could not fully reflect the elements regarding team equity, and there were a great many complaints from teams and fans. As a result, applying an optimization technique was decided upon to derive an efficient annual match schedule for the 2014 season. All the required conditions for scheduling are formulated as one or more equations and several parameter values concerning team equity are calculated with the related equations. Due to the complicated scheduling conditions, a sequential solution approach is applied by dividing the overall planning horizon in three parts. The derived annual match schedule was used for the 2014 season after some modifications, and the staff of the KBL was satisfied with the performance of the proposed scheduling methodology. Currently, this sustainable scheduling methodology is still in use to generate an efficient annual match schedule for the KBL.

  15. Pregnancy Calendar: A Week-by-Week Guide

    Science.gov (United States)

    ... Fitness Diseases & Conditions Infections Drugs & Alcohol School & Jobs Sports Expert Answers (Q&A) Staying Safe Videos for Educators Search English Español A Week-by-Week Pregnancy Calendar KidsHealth / For Parents / A Week-by-Week ...

  16. A biologically competitive 21 days hypofractionation scheme with weekly concomitant boost in breast cancer radiotherapy feasibility acute sub-acute and short term late effects

    International Nuclear Information System (INIS)

    Guenzi, Marina; Vagge, Stefano; Azinwi, Ngwa Che; D'Alonzo, Alessia; Belgioia, Liliana; Garelli, Stefania; Gusinu, Marco; Corvò, Renzo

    2010-01-01

    Radiation therapy after lumpectomy is a standard part of breast conserving therapy for invasive breast carcinoma. The most frequently used schedule worldwide is 60 Gy in 30 fractions in 6 weeks, a time commitment that sporadically may dissuade some otherwise eligible women from undertaking treatment. The purpose and primary endpoint of this perspective study is to evaluate feasibility and short-term late toxicity in a hypofractionated whole breast irradiation schedule. Between February and October 2008 we treated 65 consecutive patients with operable invasive early-stage breast cancer with a hypofractionated schedule of external beam radiation therapy. All patients were assigned to 39 Gy in 13 fractions in 3 weeks to the whole breast plus a concomitant weekly boost dose to the lumpectomy cavity of 3 Gy in 3 fractions. All the patients had achieved a median follow up of 24 months (range 21-29 months). At the end of treatment 52% presented grade 0 acute toxicity 39% had grade 1 and 9% had grade 2. At 6 months with all the patients assessed there were 34% case of grade 1 subacute toxicity and 6% of grade 2. At 12 months 43% and 3% of patients presented with clinical grade 1 and grade 2 fibrosis respectively and 5% presented grade 1 hyperpigmentation. The remaining patients were free of side effects. At 24 months, with 56 assessed, just 2 patients (3%) showed grade 2 of late fibrosis. The clinical results observed showed a reasonably good feasibility of the accelerated hypofractionated schedule in terms of acute, subacute and short-term late toxicity. This useful 13 fractions with a concomitant boost schedule seems, in selected patients, a biologically acceptable alternative to the traditional 30 days regime

  17. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  18. Combinations of response-reinforcer relations in periodic and aperiodic schedules.

    Science.gov (United States)

    Kuroda, Toshikazu; Cançado, Carlos R X; Lattal, Kennon A; Elcoro, Mirari; Dickson, Chata A; Cook, James E

    2013-03-01

    Key pecking of 4 pigeons was studied under a two-component multiple schedule in which food deliveries were arranged according to a fixed and a variable interfood interval. The percentage of response-dependent food in each component was varied, first in ascending (0, 10, 30, 70 and 100%) and then in descending orders, in successive conditions. The change in response rates was positively related to the percentage of response-dependent food in each schedule component. Across conditions, positively accelerated and linear patterns of responding occurred consistently in the fixed and variable components, respectively. These results suggest that the response-food dependency determines response rates in periodic and aperiodic schedules, and that the temporal distribution of food determines response patterns independently of the response-food dependency. Running rates, but not postfood pauses, also were positively related to the percentage of dependent food in each condition, in both fixed and variable components. Thus, the relation between overall response rate and the percentage of dependent food was mediated by responding that occurred after postfood pausing. The findings together extend previous studies wherein the dependency was either always present or absent, and increase the generality of the effects of variations in the response-food dependency from aperiodic to periodic schedules. © Society for the Experimental Analysis of Behavior.

  19. Research and Applications of Shop Scheduling Based on Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Hang ZHAO

    Full Text Available ABSTRACT Shop Scheduling is an important factor affecting the efficiency of production, efficient scheduling method and a research and application for optimization technology play an important role for manufacturing enterprises to improve production efficiency, reduce production costs and many other aspects. Existing studies have shown that improved genetic algorithm has solved the limitations that existed in the genetic algorithm, the objective function is able to meet customers' needs for shop scheduling, and the future research should focus on the combination of genetic algorithm with other optimized algorithms. In this paper, in order to overcome the shortcomings of early convergence of genetic algorithm and resolve local minimization problem in search process,aiming at mixed flow shop scheduling problem, an improved cyclic search genetic algorithm is put forward, and chromosome coding method and corresponding operation are given.The operation has the nature of inheriting the optimal individual ofthe previous generation and is able to avoid the emergence of local minimum, and cyclic and crossover operation and mutation operation can enhance the diversity of the population and then quickly get the optimal individual, and the effectiveness of the algorithm is validated. Experimental results show that the improved algorithm can well avoid the emergency of local minimum and is rapid in convergence.

  20. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  1. Energy-efficient TDMA medium access control protocol scheduling

    NARCIS (Netherlands)

    Havinga, Paul J.M.; Smit, Gerard J.M.

    2000-01-01

    In this paper we study the energy efficiency and channel efficiency of TDMA MAC protocol scheduling mechanisms. Most MAC protocols are based on phase grouping that basically has three phases in a frame: uplink, downlink and reservation. We propose a new mechanism in which we have multiple uplink and

  2. Four-Week Course of Radiation for Breast Cancer Using Hypofractionated Intensity Modulated Radiation Therapy With an Incorporated Boost

    International Nuclear Information System (INIS)

    Freedman, Gary M.; Anderson, Penny R.; Goldstein, Lori J.; Ma Changming; Li Jinsheng; Swaby, Ramona F.; Litwin, Samuel; Watkins-Bruner, Deborah; Sigurdson, Elin R.; Morrow, Monica

    2007-01-01

    Purpose: Standard radiation for early breast cancer requires daily treatment for 6 to 7 weeks. This is an inconvenience to many women, and for some a barrier for breast conservation. We present the acute toxicity of a 4-week course of hypofractionated radiation. Methods and Materials: A total of 75 patients completed radiation on a Phase II trial approved by the hospital institutional review board. Eligibility criteria were broad to include any patient normally eligible for standard radiation: age ≥18 years, invasive or in situ cancer, American Joint Committee on Cancer Stage 0 to II, breast-conserving surgery, and any systemic therapy not given concurrently. The median age was 52 years (range, 31-81 years). Of the patients, 15% had ductal carcinoma in situ, 67% T1, and 19% T2; 71% were N0, 17% N1, and 12% NX. Chemotherapy was given before radiation in 44%. Using photon intensity-modulated radiation therapy and incorporated electron beam boost, the whole breast received 45 Gy and the lumpectomy bed 56 Gy in 20 treatments over 4 weeks. Results: The maximum acute skin toxicity by the end of treatment was Grade 0 in 9 patients (12%), Grade 1 in 49 (65%) and Grade 2 in 17 (23%). There was no Grade 3 or higher skin toxicity. After radiation, all Grade 2 toxicity had resolved by 6 weeks. Hematologic toxicity was Grade 0 in most patients except for Grade 1 neutropenia in 2 patients, and Grade 1 anemia in 11 patients. There were no significant differences in baseline vs. 6-week posttreatment patient-reported or physician-reported cosmetic scores. Conclusions: This 4-week course of postoperative radiation using intensity-modulated radiation therapy is feasible and is associated with acceptable acute skin toxicity and quality of life. Long-term follow-up data are needed. This radiation schedule may represent an alternative both to longer 6-week to 7-week standard whole-breast radiation and more radically shortened 1-week, partial-breast treatment schedules

  3. The Effect of a Three-Week Adaptation to a Low Carbohydrate/High Fat Diet on Metabolism and Cognitive Performance

    Science.gov (United States)

    1990-04-11

    similar to that seen in starvation (5,21), hypocaloric weight loss diets (4, 29) and carbohydrate deprivation (12, 27, 28). Our subjects exhibited a...E.A.H. Sims. Comparison of carbohydrate-containing and carbohydrate-restricted hypocaloric diets in the treatment of obesity. J Clin Invest. 68:399-404...D-A247 575 . THE EFFECT OF A THREE-WEEK ADAPTATION TO A LOW CARBOHYDRATE / HIGH FAT DIET ON METABOLISM AND COGNITIVE PERFORMANCE C. G. GRAY 0. G

  4. Spillways Scheduling for Flood Control of Three Gorges Reservoir Using Mixed Integer Linear Programming Model

    Directory of Open Access Journals (Sweden)

    Maoyuan Feng

    2014-01-01

    Full Text Available This study proposes a mixed integer linear programming (MILP model to optimize the spillways scheduling for reservoir flood control. Unlike the conventional reservoir operation model, the proposed MILP model specifies the spillways status (including the number of spillways to be open and the degree of the spillway opened instead of reservoir release, since the release is actually controlled by using the spillway. The piecewise linear approximation is used to formulate the relationship between the reservoir storage and water release for a spillway, which should be open/closed with a status depicted by a binary variable. The control order and symmetry rules of spillways are described and incorporated into the constraints for meeting the practical demand. Thus, a MILP model is set up to minimize the maximum reservoir storage. The General Algebraic Modeling System (GAMS and IBM ILOG CPLEX Optimization Studio (CPLEX software are used to find the optimal solution for the proposed MILP model. The China’s Three Gorges Reservoir, whose spillways are of five types with the total number of 80, is selected as the case study. It is shown that the proposed model decreases the flood risk compared with the conventional operation and makes the operation more practical by specifying the spillways status directly.

  5. Short term economic emission power scheduling of hydrothermal energy systems using improved water cycle algorithm

    International Nuclear Information System (INIS)

    Haroon, S.S.; Malik, T.N.

    2017-01-01

    Due to the increasing environmental concerns, the demand of clean and green energy and concern of atmospheric pollution is increasing. Hence, the power utilities are forced to limit their emissions within the prescribed limits. Therefore, the minimization of fuel cost as well as exhaust gas emissions is becoming an important and challenging task in the short-term scheduling of hydro-thermal energy systems. This paper proposes a novel algorithm known as WCA-ER (Water Cycle Algorithm with Evaporation Rate) to inspect the short term EEPSHES (Economic Emission Power Scheduling of Hydrothermal Energy Systems). WCA has its ancestries from the natural hydrologic cycle i.e. the raining process forms streams and these streams start flowing towards the rivers which finally flow towards the sea. The worth of WCA-ER has been tested on the standard economic emission power scheduling of hydrothermal energy test system consisting of four hydropower and three thermal plants. The problem has been investigated for the three case studies (i) ECS (Economic Cost Scheduling), (ii) ES (Economic Emission Scheduling) and (iii) ECES (Economic Cost and Emission Scheduling). The results obtained show that WCA-ER is superior to many other methods in the literature in bringing lower fuel cost and emissions. (author)

  6. Schedules of controlled substances: extension of temporary placement of UR-144, XLR11, and AKB48 in schedule I of the Controlled Substances Act. Final order.

    Science.gov (United States)

    2015-05-15

    The Administrator of the Drug Enforcement Administration (DEA) is issuing this final order to extend the temporary placement of (1-pentyl-1H-indol-3-yl)(2,2,3,3-tetramethylcyclopropyl)methanone (UR-144), [1-(5-fluoro-pentyl)-1H-indol-3-yl](2,2,3,3-tetramethylcyclopropyl)methanone (5-fluoro-UR-144, XLR11) and N-(1-adamantyl)-1-pentyl-1H-indazole-3-carboxamide (APINACA, AKB48), including their salts, isomers, and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, in schedule I of the Controlled Substances Act. The current final order temporarily placing UR-144, XLR11, and AKB48 in schedule I is due to expire on May 15, 2015. This final order will extend the temporary scheduling of UR-144, XLR11, and AKB48 to May 15, 2016, or until the permanent scheduling action for these three substances is completed, whichever occurs first.

  7. Individual differences in strategic flight management and scheduling

    Science.gov (United States)

    Wickens, Christopher D.; Raby, Mireille

    1991-01-01

    A group of 30 instrument-rated pilots was made to fly simulator approaches to three airports under conditions of low, medium, and high workload conditions. An analysis is presently conducted of the difference in discrete task scheduling between the group of 10 highest and 10 lowest performing pilots in the sample; this categorization was based on the mean of various flight-profile measures. The two groups were found to differ from each other only in terms of the time when specific events were conducted, and of the optimality of scheduling for certain high-priority tasks. These results are assessed in view of the relative independence of task-management skills from aircraft-control skills.

  8. Automated medical resident rotation and shift scheduling to ensure quality resident education and patient care.

    Science.gov (United States)

    Smalley, Hannah K; Keskinocak, Pinar

    2016-03-01

    At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.

  9. Data analysis considerations for pesticides determined by National Water Quality Laboratory schedule 2437

    Science.gov (United States)

    Shoda, Megan E.; Nowell, Lisa H.; Stone, Wesley W.; Sandstrom, Mark W.; Bexfield, Laura M.

    2018-04-02

    In 2013, the U.S. Geological Survey National Water Quality Laboratory (NWQL) made a new method available for the analysis of pesticides in filtered water samples: laboratory schedule 2437. Schedule 2437 is an improvement on previous analytical methods because it determines the concentrations of 225 fungicides, herbicides, insecticides, and associated degradates in one method at similar or lower concentrations than previously available methods. Additionally, the pesticides included in schedule 2437 were strategically identified in a prioritization analysis that assessed likelihood of occurrence, prevalence of use, and potential toxicity. When the NWQL reports pesticide concentrations for analytes in schedule 2437, the laboratory also provides supplemental information useful to data users for assessing method performance and understanding data quality. That supplemental information is discussed in this report, along with an initial analysis of analytical recovery of pesticides in water-quality samples analyzed by schedule 2437 during 2013–2015. A total of 523 field matrix spike samples and their paired environmental samples and 277 laboratory reagent spike samples were analyzed for this report (1,323 samples total). These samples were collected in the field as part of the U.S. Geological Survey National Water-Quality Assessment groundwater and surface-water studies and as part of the NWQL quality-control program. This report reviews how pesticide samples are processed by the NWQL, addresses how to obtain all the data necessary to interpret pesticide concentrations, explains the circumstances that result in a reporting level change or the occurrence of a raised reporting level, and describes the calculation and assessment of recovery. This report also discusses reasons why a data user might choose to exclude data in an interpretive analysis and outlines the approach used to identify the potential for decreased data quality in the assessment of method recovery. The

  10. SYSTEMATIC LITERATURE REVIEW ON RESOURCE ALLOCATION AND RESOURCE SCHEDULING IN CLOUD COMPUTING

    OpenAIRE

    B. Muni Lavanya; C. Shoba Bindu

    2016-01-01

    The objective the work is intended to highlight the key features and afford finest future directions in the research community of Resource Allocation, Resource Scheduling and Resource management from 2009 to 2016. Exemplifying how research on Resource Allocation, Resource Scheduling and Resource management has progressively increased in the past decade by inspecting articles, papers from scientific and standard publications. Survey materialized in three-fold process. Firstly, investigate on t...

  11. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  12. Scheduling Broadcasts in a Network of Timelines

    KAUST Repository

    Manzoor, Emaad A.

    2015-05-12

    Broadcasts and timelines are the primary mechanism of information exchange in online social platforms today. Services like Facebook, Twitter and Instagram have enabled ordinary people to reach large audiences spanning cultures and countries, while their massive popularity has created increasingly competitive marketplaces of attention. Timing broadcasts to capture the attention of such geographically diverse audiences has sparked interest from many startups and social marketing gurus. However, formal study is lacking on both the timing and frequency problems. In this thesis, we introduce, motivate and solve the broadcast scheduling problem of specifying the timing and frequency of publishing content to maximise the attention received. We validate and quantify three interacting behavioural phenomena to parametrise social platform users: information overload, bursty circadian rhythms and monotony aversion, which is defined here for the first time. Our analysis of the influence of monotony refutes the common assumption that posts on social network timelines are consumed piecemeal independently. Instead, we reveal that posts are consumed in chunks, which has important consequences for any future work considering human behaviour over social network timelines. Our quantification of monotony aversion is also novel, and has applications to problems in various domains such as recommender list diversification, user satiation and variety-seeking consumer behaviour. Having studied the underlying behavioural phenomena, we link schedules, timelines, attention and behaviour by formalising a timeline information exchange process. Our formulation gives rise to a natural objective function that quantifies the expected collective attention an arrangement of posts on a timeline will receive. We apply this formulation as a case-study on real-data from Twitter, where we estimate behavioural parameters, calculate the attention potential for different scheduling strategies and, using the

  13. Concurrent Chemoradiotherapy Followed by Consolidation Chemotherapy With Bi-Weekly Docetaxel and Carboplatin for Stage III Unresectable, Non-Small-Cell Lung Cancer: Clinical Application of a Protocol Used in a Previous Phase II Study

    International Nuclear Information System (INIS)

    Saitoh, Jun-Ichi; Saito, Yoshihiro; Kazumoto, Tomoko; Kudo, Shigehiro; Yoshida, Daisaku; Ichikawa, Akihiro; Sakai, Hiroshi; Kurimoto, Futoshi; Kato, Shingo; Shibuya, Kei

    2012-01-01

    Purpose: To assess the clinical applicability of a protocol evaluated in a previously reported phase II study of concurrent chemoradiotherapy followed by consolidation chemotherapy with bi-weekly docetaxel and carboplatin in patients with stage III, unresectable, non-small-cell lung cancer (NSCLC). Methods and Materials: Between January 2000 and March 2006, 116 previously untreated patients with histologically proven, stage III NSCLC were treated with concurrent chemoradiotherapy. Radiation therapy was administered in 2-Gy daily fractions to a total dose of 60 Gy in combination with docetaxel, 30 mg/m 2 , and carboplatin at an area under the curve value of 3 every 2 weeks during and after radiation therapy. Results: The median survival time for the entire group was 25.5 months. The actuarial 2-year and 5-year overall survival rates were 53% and 31%, respectively. The 3-year cause-specific survival rate was 60% in patients with stage IIIA disease, whereas it was 35% in patients with stage IIIB disease (p = 0.007). The actuarial 2-year and 5-year local control rates were 62% and 55%, respectively. Acute hematologic toxicities of Grade ≥3 severity were observed in 20.7% of patients, while radiation pneumonitis and esophagitis of Grade ≥3 severity were observed in 2.6% and 1.7% of patients, respectively. Conclusions: The feasibility of the protocol used in the previous phase II study was reconfirmed in this series, and excellent treatment results were achieved.

  14. Concurrent Chemoradiotherapy Followed by Consolidation Chemotherapy With Bi-Weekly Docetaxel and Carboplatin for Stage III Unresectable, Non-Small-Cell Lung Cancer: Clinical Application of a Protocol Used in a Previous Phase II Study

    Energy Technology Data Exchange (ETDEWEB)

    Saitoh, Jun-Ichi, E-mail: junsaito@sannet.ne.jp [Division of Radiation Oncology, Saitama Cancer Center, Saitama (Japan); Saito, Yoshihiro; Kazumoto, Tomoko; Kudo, Shigehiro; Yoshida, Daisaku; Ichikawa, Akihiro [Division of Radiation Oncology, Saitama Cancer Center, Saitama (Japan); Sakai, Hiroshi; Kurimoto, Futoshi [Division of Respiratory Disease, Saitama Cancer Center, Saitama (Japan); Kato, Shingo [Research Center Hospital for Charged Particle Therapy, National Institute of Radiological Sciences, Chiba (Japan); Shibuya, Kei [Department of Radiation Oncology, Gunma University Graduate School of Medicine, Gunma (Japan)

    2012-04-01

    Purpose: To assess the clinical applicability of a protocol evaluated in a previously reported phase II study of concurrent chemoradiotherapy followed by consolidation chemotherapy with bi-weekly docetaxel and carboplatin in patients with stage III, unresectable, non-small-cell lung cancer (NSCLC). Methods and Materials: Between January 2000 and March 2006, 116 previously untreated patients with histologically proven, stage III NSCLC were treated with concurrent chemoradiotherapy. Radiation therapy was administered in 2-Gy daily fractions to a total dose of 60 Gy in combination with docetaxel, 30 mg/m{sup 2}, and carboplatin at an area under the curve value of 3 every 2 weeks during and after radiation therapy. Results: The median survival time for the entire group was 25.5 months. The actuarial 2-year and 5-year overall survival rates were 53% and 31%, respectively. The 3-year cause-specific survival rate was 60% in patients with stage IIIA disease, whereas it was 35% in patients with stage IIIB disease (p = 0.007). The actuarial 2-year and 5-year local control rates were 62% and 55%, respectively. Acute hematologic toxicities of Grade {>=}3 severity were observed in 20.7% of patients, while radiation pneumonitis and esophagitis of Grade {>=}3 severity were observed in 2.6% and 1.7% of patients, respectively. Conclusions: The feasibility of the protocol used in the previous phase II study was reconfirmed in this series, and excellent treatment results were achieved.

  15. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  16. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  17. Work schedule influence on sleep habits in elementary and high school teachers according to chronotype

    Directory of Open Access Journals (Sweden)

    Jane Carla de Souza

    2014-09-01

    Full Text Available The influence of work schedule on sleep habits and quality, and daytime sleepiness according to individual preferences in sleep schedules was assessed in 131 elementary and high school teachers through questionnaires. Teachers who initiate classes around 7:00 hr wake up earlier and show more frequency of poor sleep quality than those who start classes in the afternoon. Between them, those who have a preference for intermediate or later hours for sleep are more irregular in their wake up schedules and increase their sleep duration on the weekend compared to those with earlier sleep preferences. On the other hand, working only in the afternoon seems to provide better sleep/awake conditions for teachers, because they keep the same sleep duration during the week and on the weekend, and they are diagnosed with less daytime sleepiness. Therefore, the discussion of school start times, originally proposed for adolescents, needs to be magnified to teachers, contributing to improvement of sleep habits and life quality in school environments.

  18. Uncertainty management by relaxation of conflicting constraints in production process scheduling

    Science.gov (United States)

    Dorn, Juergen; Slany, Wolfgang; Stary, Christian

    1992-01-01

    Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.

  19. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  20. Nonlinear observer output-feedback MPC treatment scheduling for HIV

    Directory of Open Access Journals (Sweden)

    Zurakowski Ryan

    2011-05-01

    Full Text Available Abstract Background Mathematical models of the immune response to the Human Immunodeficiency Virus demonstrate the potential for dynamic schedules of Highly Active Anti-Retroviral Therapy to enhance Cytotoxic Lymphocyte-mediated control of HIV infection. Methods In previous work we have developed a model predictive control (MPC based method for determining optimal treatment interruption schedules for this purpose. In this paper, we introduce a nonlinear observer for the HIV-immune response system and an integrated output-feedback MPC approach for implementing the treatment interruption scheduling algorithm using the easily available viral load measurements. We use Monte-Carlo approaches to test robustness of the algorithm. Results The nonlinear observer shows robust state tracking while preserving state positivity both for continuous and discrete measurements. The integrated output-feedback MPC algorithm stabilizes the desired steady-state. Monte-Carlo testing shows significant robustness to modeling error, with 90% success rates in stabilizing the desired steady-state with 15% variance from nominal on all model parameters. Conclusions The possibility of enhancing immune responsiveness to HIV through dynamic scheduling of treatment is exciting. Output-feedback Model Predictive Control is uniquely well-suited to solutions of these types of problems. The unique constraints of state positivity and very slow sampling are addressable by using a special-purpose nonlinear state estimator, as described in this paper. This shows the possibility of using output-feedback MPC-based algorithms for this purpose.

  1. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  2. Amphetamine increases schedule-induced drinking reduced by negative punishment procedures.

    Science.gov (United States)

    Pérez-Padilla, Angeles; Pellón, Ricardo

    2003-05-01

    d-Amphetamine has been reported to increase schedule-induced drinking punished by lick-dependent signalled delays in food delivery. This might reflect a drug-behaviour interaction dependent on the type of punisher, because no such effect has been found when drinking was reduced by lick-contingent electric shocks. However, the anti-punishment effect of amphetamine could be mediated by other behavioural processes, such as a loss of discriminative control or an increase in the value of delayed reinforcers. To test the effects of d-amphetamine on the acquisition and maintenance of schedule-induced drinking reduced by unsignalled delays in food delivery. Rats received 10-s unsignalled delays initiated by each lick after polydipsia was induced by a fixed-time 30-s food reinforcement schedule or from the outset of the experiment. Yoked-control rats received these same delays but independently of their own behaviour. d-Amphetamine (0.1-3.0 mg/kg) was then tested IP. d-Amphetamine dose-dependently increased and then decreased punished schedule-induced drinking. The drug led to dose-dependent reductions when the delays were not contingent or when they were applied from the outset of training. These results support the contention that d-amphetamine has an increasing effect on schedule-induced drinking that has been previously reduced by a negative punishment procedure. This effect cannot be attributed to other potentially involved processes, and therefore support the idea that drug effects on punished behaviour depend on punishment being delays in food or shock deliveries.

  3. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  4. Student Time Usage during Fall Reading Week

    Science.gov (United States)

    Cramer, Ken; Pschibul, Rebecca

    2017-01-01

    The present study investigated the time usage and levels of perceived stress, academic workload, and recreation time for 177 students at the University of Windsor before, during, and after Fall Reading Week (FRW). Over a three-week span (at various times of the day), students received a message to their smartphone to complete a 20-second survey…

  5. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  6. Microstructural evolution in dual-ion irradiated 316SS under various helium injection schedules

    International Nuclear Information System (INIS)

    Kohyama, A.; Igata, N.; Ayrault, G.; Tokyo Univ.

    1984-01-01

    Dual-ion irradiated 316 SS samples with various helium injection schedules were studied. The intent of using different schedules was to either approximate the MFR condition, mimic the mixed spectrum reactor condition or mimic the fast reactor condition. The objective of this investigation is to study the influence of these different helium injection schedules on the microstructural development under irradiation. The materials for this study was 316 SS (MFE heat) with three thermomechanical pre-irradiation treatments: solution annealed, solution annealed and aged and 20% cold worked. The cavity nucleation and growth stages were investigated using high resolution TEM. (orig.)

  7. Randomized Phase III Noninferiority Study Comparing Two Radiotherapy Fractionation Schedules in Patients With Low-Risk Prostate Cancer

    Science.gov (United States)

    Dignam, James J.; Amin, Mahul B.; Bruner, Deborah W.; Low, Daniel; Swanson, Gregory P.; Shah, Amit B.; D’Souza, David P.; Michalski, Jeff M.; Dayes, Ian S.; Seaward, Samantha A.; Hall, William A.; Nguyen, Paul L.; Pisansky, Thomas M.; Faria, Sergio L.; Chen, Yuhchyau; Koontz, Bridget F.; Paulus, Rebecca; Sandler, Howard M.

    2016-01-01

    Purpose Conventional radiotherapy (C-RT) treatment schedules for patients with prostate cancer typically require 40 to 45 treatments that take place from > 8 to 9 weeks. Preclinical and clinical research suggest that hypofractionation—fewer treatments but at a higher dose per treatment—may produce similar outcomes. This trial was designed to assess whether the efficacy of a hypofractionated radiotherapy (H-RT) treatment schedule is no worse than a C-RT schedule in men with low-risk prostate cancer. Patients and Methods A total of 1,115 men with low-risk prostate cancer were randomly assigned 1:1 to C-RT (73.8 Gy in 41 fractions over 8.2 weeks) or to H-RT (70 Gy in 28 fractions over 5.6 weeks). This trial was designed to establish (with 90% power and an α of .05) that treatment with H-RT results in 5-year disease-free survival (DFS) that is not worse than C-RT by more than 7.65% (H-RT/C-RT hazard ratio [HR] < 1.52). Results A total of 1,092 men were protocol eligible and had follow-up information; 542 patients were assigned to C-RT and 550 to H-RT. Median follow-up was 5.8 years. Baseline characteristics were not different according to treatment assignment. The estimated 5-year DFS was 85.3% (95% CI, 81.9 to 88.1) in the C-RT arm and 86.3% (95% CI, 83.1 to 89.0) in the H-RT arm. The DFS HR was 0.85 (95% CI, 0.64 to 1.14), and the predefined noninferiority criterion that required that DFS outcomes be consistent with HR < 1.52 was met (P < .001). Late grade 2 and 3 GI and genitourinary adverse events were increased (HR, 1.31 to 1.59) in patients who were treated with H-RT. Conclusion In men with low-risk prostate cancer, the efficacy of 70 Gy in 28 fractions over 5.6 weeks is not inferior to 73.8 Gy in 41 fractions over 8.2 weeks, although an increase in late GI/genitourinary adverse events was observed in patients treated with H-RT. PMID:27044935

  8. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  9. Weight loss in the first month post-gastroplasty following diet progression with introduction of solid food three weeks after surgery

    OpenAIRE

    ANDRADE, Camila Garcia da Costa; LOBO, Amanda

    2014-01-01

    BACKGROUND: Bariatric surgery is an effective tool in treating severe obesity. It provides significant weight loss in morbidly obese people accompanied by improvement in comorbidities and quality of life. AIM: To investigate the weight loss outcomes in the first month after bariatric surgery after introduction of solids three weeks postoperatively. METHODS: Thirty-two charts of patients who underwent bariatric surgery were analyzed at a private nutritional clinic in São Sebastião do Para...

  10. The influence of the operating schedule of the Greek Research Reactor on the radiological consequences of the reactor

    International Nuclear Information System (INIS)

    Kollas, J.G.

    1986-04-01

    The sensitivity of the radiological consequences of the Greek Research Reactor to the operating schedule of the reactor is assessed in this report. The consequences are due to the occurrence of a postulated accident, a 20% core melt loss of coolant accident. Three different operating schedules are considered: (a) the present 8 hrs/day, 5 days/wk schedule, (b) a 16 hrs/day, 5 days/wk schedule, and (c) a continuous operation schedule. The results of the analysis indicate that there is a direct relation between consequences and duration of operation. (author)

  11. JOB SHOP SCHEDULING BIOBJETIVO MEDIANTE ENFRIAMIENTO SIMULADO Y ENFOQUE DE PARETO JOB-SHOP SCHEDULING: BIO-OBJECTIVE THROUGH SIMULATED COOLING AND PARETO PRINCIPLE

    Directory of Open Access Journals (Sweden)

    Juan Carlos Osorio

    2012-12-01

    Full Text Available El problema del scheduling es uno de los problemas más ampliamente tratados en la literatura; sin embargo, es un problema complejo NP hard. Cuando, además, se involucra más de un objetivo, este problema se convierte en uno de los más complejos en el campo de la investigación de operaciones. Se presenta entonces un modelo biobjetivo para el job shop scheduling que incluye el makespan y el tiempo de flujo medio. Para resolver el modelo se ha utilizado una propuesta que incluye el uso del meta-heurístico Recocido Simulado (SA y el enfoque de Pareto. Este modelo es evaluado en tres problemas presentados en la literatura de tamaños 6x6, 10x5 y 10x10. Los resultados del modelo se comparan con otros meta-heurísticos y se encuentra que este modelo presenta buenos resultados en los tres problemas evaluados.The scheduling problem is one of the most widely treated problems in literature; however, it is an NP hard complex problem. Also, when more than one objective is involved, this problem becomes one of the most complex ones in the field of operations research. A bio-objective model is then emerged for the Job-Shop Scheduling, including makespan and mean flow time. For solving the model a proposal which includes the use of Simulated Annealing (SA metaheuristic and Pareto Principle. This model is evaluated in three problems described in literature with the following sizes: 6x6, 10x5 and 10x10. Results of the model are compared to other metaheuristics and it has been found that this model shows good results in the three problems evaluated.

  12. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  13. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  14. Designing a prototype of the ITER pulse scheduling system

    International Nuclear Information System (INIS)

    Yamamoto, T.; Yonekawa, I.; Ohta, K.; Hosoyama, H.; Hashimoto, Y.; Wallander, A.; Winter, A.; Sugie, T.; Kusama, Y.; Kawano, Y.; Yoshino, R.

    2012-01-01

    Highlights: ► We designed a prototype of the ITER pulse scheduling system. ► Structure of ITER pulse schedules was designed. ► Validation and automatic value assignment functions were adopted. ► A prototype will be implemented in 2011. - Abstract: A prototype of the ITER pulse scheduling system that prepares and manages parameters for ITER plasma operations has been designed. Based on the analyzed requirements on the system, structure of the parameters and necessary functions were determined. Segment and module structures were tuned to the ITER requirements. Three types of validations assure sanity of the parameters. The design limits check and the operation window check verify whether the values of the parameters do not exceed the limits. The consistency check calculates dependency among parameters in accordance with logics described in a scripting language. The ITER pulse scheduling system provides interface with a physics model and simulator. Some abstract physics parameters are converted to engineering parameters with the physics simulation. The results of simulation such as plasma characteristics of specified parameters are also shown to the researchers. The tool to specify the parameters is data-driven. Therefore, it is flexible for changes of number of the parameters. A prototype is being implemented in 2011. Using the prototype, this design will be verified and refined. The evaluation of the prototype will be a basis of the final production of the ITER pulse scheduling system.

  15. Energy-driven scheduling algorithm for nanosatellite energy harvesting maximization

    Science.gov (United States)

    Slongo, L. K.; Martínez, S. V.; Eiterer, B. V. B.; Pereira, T. G.; Bezerra, E. A.; Paiva, K. V.

    2018-06-01

    The number of tasks that a satellite may execute in orbit is strongly related to the amount of energy its Electrical Power System (EPS) is able to harvest and to store. The manner the stored energy is distributed within the satellite has also a great impact on the CubeSat's overall efficiency. Most CubeSat's EPS do not prioritize energy constraints in their formulation. Unlike that, this work proposes an innovative energy-driven scheduling algorithm based on energy harvesting maximization policy. The energy harvesting circuit is mathematically modeled and the solar panel I-V curves are presented for different temperature and irradiance levels. Considering the models and simulations, the scheduling algorithm is designed to keep solar panels working close to their maximum power point by triggering tasks in the appropriate form. Tasks execution affects battery voltage, which is coupled to the solar panels through a protection circuit. A software based Perturb and Observe strategy allows defining the tasks to be triggered. The scheduling algorithm is tested in FloripaSat, which is an 1U CubeSat. A test apparatus is proposed to emulate solar irradiance variation, considering the satellite movement around the Earth. Tests have been conducted to show that the scheduling algorithm improves the CubeSat energy harvesting capability by 4.48% in a three orbit experiment and up to 8.46% in a single orbit cycle in comparison with the CubeSat operating without the scheduling algorithm.

  16. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  17. Strategies for managing work/life interaction among women and men with variable and unpredictable work hours in retail sales in Québec, Canada.

    Science.gov (United States)

    Messing, Karen; Tissot, France; Couture, Vanessa; Bernstein, Stephanie

    2014-01-01

    Increasingly, work schedules in retail sales are generated by software that takes into account variations in predicted sales. The resulting variable and unpredictable schedules require employees to be available, unpaid, over extended periods. At the request of a union, we studied schedule preferences in a retail chain in Québec using observations, interviews, and questionnaires. Shift start times had varied on average by four hours over the previous week; 83 percent had worked at least one day the previous weekend. Difficulties with work/life balance were associated with schedules and, among women, with family responsibilities. Most workers wanted: more advance notice; early shifts; regular schedules; two days off in sequence; and weekends off. Choices varied, so software could be adapted to take preferences into account. Also, employers could give better advance notice and establish systems for shift exchanges. Governments could limit store hours and schedule variability while prolonging the minimum sequential duration of leave per week.

  18. Late-life depressive symptoms, religiousness, and mood in the last week of life.

    Science.gov (United States)

    Braam, Arjan W; Klinkenberg, Marianne; Galenkamp, Henrike; Deeg, Dorly J H

    2012-01-01

    Aim of the current study is to examine whether previous depressive symptoms modify possible effects of religiousness on mood in the last week of life. After-death interviews with proxy respondents of deceased sample members of the Longitudinal Aging Study Amsterdam provided information on depressed mood in the last week of life, as well as on the presence of a sense of peace with the approaching end of life. Other characteristics were derived from interviews with the sample members when still alive. Significant interactions were identified between measures of religiousness and previous depressive symptoms (CES-D scores) in their associations with mood in the last week of life. Among those with previous depressive symptoms, church-membership, church-attendance and salience of religion were associated with a greater likelihood of depressed mood in the last week of life. Among those without previous depressive symptoms, church-attendance and salience of religion were associated with a higher likelihood of a sense of peace. For older adults in the last phase of life, supportive effects of religiousness were more or less expected. Fore those with recent depressive symptoms, however, religiousness might involve a component of existential doubt.

  19. Multi-User Preemptive Scheduling For Critical Low Latency Communications in 5G Networks

    DEFF Research Database (Denmark)

    Abdul-Mawgood Ali Ali Esswie, Ali; Pedersen, Klaus

    2018-01-01

    5G new radio is envisioned to support three major service classes: enhanced mobile broadband (eMBB), ultrareliable low-latency communications (URLLC), and massive machine type communications. Emerging URLLC services require up to one millisecond of communication latency with 99.999% success...... probability. Though, there is a fundamental trade-off between system spectral efficiency (SE) and achievable latency. This calls for novel scheduling protocols which cross-optimize system performance on user-centric; instead of network-centric basis. In this paper, we develop a joint multi-user preemptive...... scheduling strategy to simultaneously cross-optimize system SE and URLLC latency. At each scheduling opportunity, available URLLC traffic is always given higher priority. When sporadic URLLC traffic appears during a transmission time interval (TTI), proposed scheduler seeks for fitting the URLLC-eMBB traffic...

  20. Home Health Care for California's Injured Workers: Options for Implementing a Fee Schedule.

    Science.gov (United States)

    Wynn, Barbara O; Boustead, Anne

    2015-07-15

    The California Department of Industrial Relations/Division of Worker's Compensation asked RAND to provide technical assistance in developing a fee schedule for home health services provided to injured workers. The fee schedule needs to address the full spectrum of home health services ranging from skilled nursing and therapy services to unskilled personal care or chore services that may be provided by family members. RAND researchers consulted with stakeholders in the California workers' compensation system to outline issues the fee schedule should address, reviewed home health fee schedules used by other payers, and conducted interviews with WC administrators from other jurisdictions to elicit their experiences. California stakeholders identified unskilled attendant services as most problematic in determining need and payment rates, particularly services furnished by family members. RAND researchers concentrated on fee schedule options that would result in a single fee schedule covering the full range of home health care services furnished to injured workers and made three sets of recommendations. The first set pertains to obtaining additional information that would highlight the policy issues likely to occur with the implementation of the fee schedule and alternatives for assessing an injured worker's home health care needs. Another approach conforms most closely with the Labor Code requirements. It would integrate the fee schedules used by Medicare, In-Home Health Supportive Services, and the federal Office of Workers' Compensation. The third approach would base the home health fee schedule on rules used by the federal Office of Workers' Compensation.

  1. Protocol-transparent resource sharing in hierarchically scheduled real-time systems

    NARCIS (Netherlands)

    Heuvel, van den M.M.H.P.; Bril, R.J.; Lukkien, J.J.

    2010-01-01

    Hierarchical scheduling frameworks (HSFs) provide means for composing complex real-time systems from well-defined, independently analyzed subsystems. To support resource sharing within two-level HSFs, three synchronization protocols based on the stack resource policy (SRP) have recently been

  2. Phase I trial of concurrent chemoradiotherapy for laryngeal and hypopharyngeal cancers with bi-weekly docetaxel

    International Nuclear Information System (INIS)

    Yoshida, Tomoyuki; Nakamura, Kazuhiro; Simizu, Shigetaka

    2005-01-01

    Docetaxel (DOC) has radiation-sensitizing effects because it synchronizes with the most radiation-sensitive G2/M phase of the cell cycle. From the results of concurrent radiotherapy with weekly DOC administrations in a phase I trial, dose-limiting toxicity (DLT) was mucositis and the recommended dose was 10 mg/m 2 , but the administration schedule was a problem. We planned concurrent radiation therapy in a bi-weekly DOC phase I trial to improve the larynx preservation rate and to determine which schedule and dosage of DOC would yield its inherent cytotoxic effects. We decided the maximum tolerated dose (MTD) and DLT to serve as an index of the appearance of adverse events. Patients with stage II or stage III T2N1 hypopharyngeal cancer or stage II or III laryngeal cancer were included in this study. DOC was administered on the days of initiation of bi-weekly radiation (day 1, day 15, day 29). Radiation was given (2 Gy/day: 5 days per week) for a total of 30 Fr, with a total of 60 Gy. The starting dose of DOC was 30 mg/m 2 (level 1) and the dosage was raised by 5 mg/m 2 at each level. DLT was observed due to mucositis and neutropenia at 40 mg/m 2 (level 3), the MTD was 40 mg/m 2 and the recommended dose (RD) was 35 mg/m 2 . Especially in hypopharyngeal cancer of Grade 3 or more, mucositis appeared, with swallowing difficulty in cases with a wide range of irradiation. At dosages of 35 mg/m 2 , the effectiveness was favorable and this was the suitable dosage recommended for the subsequent phase II trial. This clinical study was performed with permission of our IRB (Institutional Review Board). (author)

  3. An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT

    Science.gov (United States)

    Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan

    2016-01-01

    In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process. PMID:27827909

  4. An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT.

    Science.gov (United States)

    Pozza, Riccardo; Georgoulas, Stylianos; Moessner, Klaus; Nati, Michele; Gluhak, Alexander; Krco, Srdjan

    2016-11-04

    In this article, an Arrival and Departure Time Predictor (ADTP) for scheduling communication in opportunistic Internet of Things (IoT) is presented. The proposed algorithm learns about temporal patterns of encounters between IoT devices and predicts future arrival and departure times, therefore future contact durations. By relying on such predictions, a neighbour discovery scheduler is proposed, capable of jointly optimizing discovery latency and power consumption in order to maximize communication time when contacts are expected with high probability and, at the same time, saving power when contacts are expected with low probability. A comprehensive performance evaluation with different sets of synthetic and real world traces shows that ADTP performs favourably with respect to previous state of the art. This prediction framework opens opportunities for transmission planners and schedulers optimizing not only neighbour discovery, but the entire communication process.

  5. A Constraint Logic Programming Framework for the Synthesis of Fault-Tolerant Schedules for Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Poulsen, Kåre Harbo; Pop, Paul; Izosimov, Viacheslav

    2007-01-01

    -execution for recovering from multiple transient faults. We propose three scheduling approaches, which each present a trade-off between schedule simplicity and performance, (i) full transparency, (ii) slack sharing and (iii) conditional, and provide various degrees of transparency. We have developed a CLP framework...

  6. Preparative Protein Production from Inclusion Bodies and Crystallization: A Seven-Week Biochemistry Sequence

    Science.gov (United States)

    Peterson, Megan J.; Snyder, W. Kalani; Westerman, Shelley; McFarland, Benjamin J.

    2011-01-01

    We describe how to produce and purify proteins from E. coli inclusion bodies by adapting versatile, preparative-scale techniques to the undergraduate laboratory schedule. This seven-week sequence of experiments fits into an annual cycle of research activity in biochemistry courses. Recombinant proteins are expressed as inclusion bodies, which are collected, washed, then solubilized in urea. Stepwise dialysis to dilute urea over the course of a week produces refolded protein. Column chromatography is used to purify protein into fractions, which are then analyzed with gel electrophoresis and concentration assays. Students culminate the project by designing crystallization trials in sitting-drop trays. Student evaluation of the experience has been positive, listing 5–12 new techniques learned, which are transferrable to graduate research in academia and industry. PMID:21691428

  7. Immunization by intrabronchial administration to 1-week-old foals of an unmarked double gene disruption strain of Rhodococcus equi strain 103+.

    Science.gov (United States)

    Pei, Yanlong; Nicholson, Vivian; Woods, Katharine; Prescott, John F

    2007-11-15

    Rhodococcus equi causes fatal granulomatous pneumonia in foals and immunocompromised animals and humans. However, there is no effective vaccine against this infection. In this study, the chromosomal genes isocitrate lyase (icl) and cholesterol oxidase (choE) were chosen as targets for mutation and assessment of the double mutant as an intrabronchial vaccine in 1-week-old foals. Using a modification of a suicide plasmid previously developed in this laboratory, we developed a choE-icl unmarked deletion mutant of R. equi strain 103+. Five 1-week-old foals were infected intrabronchially with the mutant and challenged intrabronchially with the parent, virulent, strain 2 weeks later. Three of the foals were protected against pneumonia caused by the virulent strain, but the other two foals developed pneumonia caused by the mutant strain during the post-challenge period. Since infection of 3-week-old foals by an icl mutant in an earlier study had shown complete attenuation of the strain, we conclude that a proportion of foals in the 1st week or so of life are predisposed to developing R. equi pneumonia because of an inability to mount an effective immune response. This has been suspected previously but this is the first time that this has been demonstrated experimentally.

  8. A comparison of 12 weeks of pilates and aquatic training on the dynamic balance of women with mulitple sclerosis.

    Science.gov (United States)

    Marandi, Sayyed Mohammad; Nejad, Vahid Shayegan; Shanazari, Zohreh; Zolaktaf, Vahid

    2013-04-01

    Multiple Sclerosis (MS) is a disabling chronic disease of the nervous system in which the myelin system of the central nervous system is deteriorated. The objective of this study is to understand the effect of Pilates exercises and aquatic training for a 12 week period on the dynamic balance of MS patients. The research method is semi-experimental. As a result, among the female patients visiting the MS clinic of Kashani hospital in Esfahan, 57 patients with disease intensity levels between 0 and 4.5 were taken as samples. The average length of the disease was 8 ± 2 years, 20;40 years old, and they were randomly divided into three groups of Pilates exercise group, aquatic training group, and the control group. The exercise schedule for the experiment groups consisted of 12 weeks, three sessions per week, and 1 hour for each session. The dynamic balance of the patients, before and after the exercises was measured by Six Spot Step Test. The adjusted mean differences of Timed Up and Go Test (TUGT) scores of the experimental groups are significantly different (PPilates exercise interventions and aquatic training can significantly increase the dynamic balance of the examinees in the post-experiment stage. Performing the Pilate exercises and aquatic training increases dynamic balance of the MS patients. Considering the role of dynamic balance on physical fitness and enabling the person in doing is daily chores and routines, and its direct effect on the quality of life, it leads the specialists in applying these exercises as a supplementary treatment along with the medicinal treatments for MS patients.

  9. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  10. Implementation of Compressed Work Schedules: Participation and Job Redesign as Critical Factors for Employee Acceptance.

    Science.gov (United States)

    Latack, Janina C.; Foster, Lawrence W.

    1985-01-01

    Analyzes the effects of an implementation of a three-day/thirty-eight hour (3/38) work schedule among information systems personnel (N=84). Data showed that 18 months after implementation, 3/38 employees still strongly favor the compressed schedule. Data also suggest substantial organizational payoffs including reductions in sick time, overtime,…

  11. Real-time-service-based Distributed Scheduling Scheme for IEEE 802.16j Networks

    OpenAIRE

    Kuo-Feng Huang; Shih-Jung Wu

    2013-01-01

    Supporting Quality of Service (QoS) guarantees for diverse multimedia services is the primary concern for IEEE802.16j networks. A scheduling scheme that satisfies the QoS requirements has become more important for wireless communications. We proposed an adaptive nontransparent-based distributed scheduling scheme (ANDS) for IEEE 802.16j networks. ANDS comprises three major components: Priority Assignment, Resource Allocation, Preserved Bandwidth Adjustment. Different service-type connections p...

  12. Efficacy of weekly docetaxel and concomitant radiotherapy for squamous cell carcinoma of the head and neck

    International Nuclear Information System (INIS)

    Fujii, Masato; Tsukuda, Mamoru; Kubota, Akira; Kida, Akinori; Okami, Kenji

    2004-01-01

    Docetaxel (DOC) is one of the most promising drugs for head and neck cancer (HNSCC). A phase II trial of concurrent DOC and radiation for HNSCC was conducted to evaluate the therapeutic benefit based on the response and toxicity of the recommended dose schedule. We also studied the prognosis of patients. Patients with squamous cell carcinoma of the head and neck were entered. All of the patients received radiation with 2.0 Gy single daily fractions up to 60 Gy. DOC was administered weekly for six consecutive weeks during radiotherapy. The recommended dose was decided to be 10 mg/m 2 in a previously reported phase I study. Thirty-nine patients with stage II, III or IV were registered; 35 patients were eligible; 32 patients were evaluable for response, and 34 were evaluable for toxicity. The overall response rate was 96.9%. The prognoses of the complete response (CR) patients were statistically better compared with the partial response (PR) patients. Grade 3 or 4 adverse events consisted of lymphopenia in 64.7%, stomatitis, in 41.2% and anorexia in 20.6% of the patients. Thirty-two of the 35 eligible patients showed high compliance of over 90%, and their toxicities were manageable. Even low-dose DOC shows a strong effect on HNSCC in combination with radiation. The CR patients showed a high survival rate, though the prognosis of non-CR patients was poor. Further treatment for non-CR patients with advanced HNSCC will be needed. (author)

  13. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  14. Exploring a QoS Driven Scheduling Approach for Peer-to-Peer Live Streaming Systems with Network Coding

    Science.gov (United States)

    Cui, Laizhong; Lu, Nan; Chen, Fu

    2014-01-01

    Most large-scale peer-to-peer (P2P) live streaming systems use mesh to organize peers and leverage pull scheduling to transmit packets for providing robustness in dynamic environment. The pull scheduling brings large packet delay. Network coding makes the push scheduling feasible in mesh P2P live streaming and improves the efficiency. However, it may also introduce some extra delays and coding computational overhead. To improve the packet delay, streaming quality, and coding overhead, in this paper are as follows. we propose a QoS driven push scheduling approach. The main contributions of this paper are: (i) We introduce a new network coding method to increase the content diversity and reduce the complexity of scheduling; (ii) we formulate the push scheduling as an optimization problem and transform it to a min-cost flow problem for solving it in polynomial time; (iii) we propose a push scheduling algorithm to reduce the coding overhead and do extensive experiments to validate the effectiveness of our approach. Compared with previous approaches, the simulation results demonstrate that packet delay, continuity index, and coding ratio of our system can be significantly improved, especially in dynamic environments. PMID:25114968

  15. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  16. A randomized phase II study of carboplatin with weekly or every-3-week nanoparticle albumin-bound paclitaxel (abraxane) in patients with extensive-stage small cell lung cancer.

    Science.gov (United States)

    Grilley-Olson, Juneko E; Keedy, Vicki L; Sandler, Alan; Moore, Dominic T; Socinski, Mark A; Stinchcombe, Thomas E

    2015-02-01

    Platinum plus etoposide is the standard therapy for extensive-stage small cell lung cancer (ES-SCLC) and is associated with significant myelosuppression. We hypothesized that the combination of carboplatin and nanoparticle albumin-bound paclitaxel (nab-paclitaxel) would be better tolerated. We investigated carboplatin with nab-paclitaxel on every-3-week and weekly schedules. This noncomparative randomized phase II trial used a two-stage design. The primary objective was objective response rate, and secondary objectives were progression-free survival, overall survival, and toxicity. Patients with ES-SCLC and an Eastern Cooperative Oncology Group performance status ≤2 and no prior chemotherapy were randomized in a 1:1 ratio to arm A (carboplatin area under the curve [AUC] of 6 on day 1 and nab-paclitaxel of 300 mg/m(2) on day 1 every 3 weeks) or arm B (carboplatin AUC of 6 on day 1 and nab-paclitaxel 100 mg/m(2) on days 1, 8, and 15 every 21 days). Response was assessed after every two cycles. Patients required frequent dose reductions, treatment delays, and omission of the weekly therapy. The trial was closed because of slow accrual. Carboplatin and nab-paclitaxel demonstrated activity in ES-SCLC but required frequent dose adjustments. ©AlphaMed Press; the data published online to support this summary is the property of the authors.

  17. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  18. Weight loss in the first month post-gastroplasty following diet progression with introduction of solid food three weeks after surgery.

    Science.gov (United States)

    Andrade, Camila Garcia da Costa; Lobo, Amanda

    2014-01-01

    Bariatric surgery is an effective tool in treating severe obesity. It provides significant weight loss in morbidly obese people accompanied by improvement in comorbidities and quality of life. To investigate the weight loss outcomes in the first month after bariatric surgery after introduction of solids three weeks postoperatively. Thirty-two charts of patients who underwent bariatric surgery were analyzed at a private nutritional clinic in São Sebastião do Paraíso, MG, Brazil; 93,75% of the subjects underwent Roux-en-Y gastric bypass, and 6,25% vertical gastrectomy. The subjects were 16 to 60 years. A body mass index of 30 to 69 Kg/m2 was obtained. Patients were instructed to eat small amounts several times a day, eat slowly, chew foods thoroughly, substitute sugar for sweetener, stop drinking gassy beverages, set the utensils down in between meals, drink only in between meals, avoid processed condiments and fried and greasy foods. In the first month after surgery, the mean weight loss was 9,7% and the percentage of excess weight loss was 23,9%. It was found that there was significant statistical difference in relation to initial and final weight (p=0,00; pfreedom of choice in health care once one does not have to go on food intake modifications for more than three weeks; more nutritional guidelines is followed and prospective weight loss is presented.

  19. Impaired Behavior Regulation under Conditions of Concurrent Variable Schedules of Reinforcement in Children with ADHD

    Science.gov (United States)

    Taylor, David; Lincoln, Alan J.; Foster, Sharon L.

    2010-01-01

    Objective: To bridge theory of response inhibition and learning in children with ADHD. Method: Thirty ADHD and 30 non-ADHD children (ages 9-12) were compared under concurrent variable interval (VI-15 sec., VI-30 sec. and VI- 45 sec.) reinforcement schedules that required the child to switch between the three schedules under conditions of…

  20. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  1. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  2. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  3. Working Less and Enjoying It More: Alternative Work Schedules.

    Science.gov (United States)

    Shanks, Katherine

    1984-01-01

    Explores three forms of alternative work schedules that research has shown improve job performance and decrease absenteeism: flextime (starting and stopping times vary within limits); permanent part-time employment (regular employment carried out during shorter working hours); and job sharing (two or more part-time employees share one full-time…

  4. Who benefits from family support? Work schedule and family differences.

    Science.gov (United States)

    Jennings, Kristen S; Sinclair, Robert R; Mohr, Cynthia D

    2016-01-01

    Prior research has demonstrated the benefits of family-supportive organization perceptions (FSOP) for reducing stress, increasing satisfaction, and increasing worker commitment; however, less research has studied health outcomes or possible differences in the effects of FSOP based on worker characteristics. The present study examined relationships between FSOP and health outcomes, as well as how those relationships may depend on work schedule and family differences. Using a sample of 330 acute care nurses, the findings indicated that FSOP predicted several health and well-being outcomes obtained 9 months later. Further, the relationships between FSOP and the outcome variables depended on some work schedule and family differences. In terms of family differences, FSOP was most strongly related to life satisfaction for those who cared for dependent adults. The relationship between FSOP and health outcomes of depression, musculoskeletal pain, and physical health symptoms were generally significant for workers with dependent children, but not significant for workers with no children. Regarding schedule differences, the relationship between FSOP and life satisfaction was significant for those on nonstandard (evening/night) shifts but not significant for standard day shift workers; however, there were no differences in FSOP relationships by number of hours worked per week. The findings demonstrate that FSOP may benefit some employees more than others. Such differences need to be incorporated into both future work-family theory development and into efforts to document the effectiveness of family-supportive policies, programs, and practices. (c) 2016 APA, all rights reserved).

  5. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project

    Directory of Open Access Journals (Sweden)

    Fuqiang Lu

    2017-01-01

    Full Text Available IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA and genetic algorithm (GA is designed, namely, simulated annealing genetic algorithm (SAGA. The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment. Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence. Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.

  6. Memory consolidation from seconds to weeks: A three-stage neural network model with autonomous reinstatement dynamics

    Directory of Open Access Journals (Sweden)

    Florian eFiebig

    2014-07-01

    Full Text Available Declarative long-term memories are not created at an instant. Gradual stabilization and temporally shifting dependence of acquired declarative memories on different brain regions - called systems consolidation - can be tracked in time by lesion experiments. The observation of temporally graded retrograde amnesia following hippocampal lesions, points to a gradual transfer of memory from hippocampus to neocortical long-term memory. Spontaneous reactivations of hippocampal memories, as observed in place cell reactivations during slow-wave-sleep, are supposed to drive neocortical reinstatements and facilitate this process.We propose a functional neural network implementation of these ideas and furthermore suggest an extended three-stage framework that also includes the prefrontal cortex and bridges the temporal chasm between working memory percepts on the scale of seconds and consolidated long-term memory on the scale of weeks or months.We show that our three-stage model can autonomously produce the necessary stochastic reactivation dynamics for successful episodic memory consolidation. The resulting learning system is shown to exhibit classical memory effects seen in experimental studies, such as retrograde and anterograde amnesia after simulated hippocampal lesioning; furthermore the model reproduces peculiar biological findings on memory modulation, such as retrograde facilitation of memory after suppressed acquisition of new long-term memories - similar to the effects of benzodiazepines on memory.

  7. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  8. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  9. Phase I dose-finding study of cabazitaxel administered weekly in patients with advanced solid tumours

    International Nuclear Information System (INIS)

    Fumoleau, Pierre; Trigo, Jose Manuel; Isambert, Nicolas; Sémiond, Dorothée; Gupta, Sunil; Campone, Mario

    2013-01-01

    Cabazitaxel is approved in patients with metastatic hormone-refractory prostate cancer previously treated with a docetaxel-containing regimen. This study evaluated a weekly cabazitaxel dosing regimen. Primary objectives were to report dose-limiting toxicities (DLTs) and to determine the maximum tolerated dose (MTD). Efficacy, safety and pharmacokinetics were secondary objectives. Cabazitaxel was administered weekly (1-hour intravenous infusion at 1.5–12 mg/m2 doses) for the first 4 weeks of a 5-week cycle in patients with solid tumours. Monitoring of DLTs was used to determine the MTD and the recommended weekly dose. Thirty-one patients were enrolled. Two of six patients experienced DLTs at 12 mg/m 2 , which was declared the MTD. Gastrointestinal disorders were the most common adverse event. Eight patients developed neutropenia (three ≥ Grade 3); one occurrence of febrile neutropenia was reported. There were two partial responses (in breast cancer) and 13 patients had stable disease (median duration of 3.3 months). Increases in C max and AUC 0–t were dose proportional for the 6–12 mg/m 2 doses. The MTD of weekly cabazitaxel was 12 mg/m 2 and the recommended weekly dose was 10 mg/m 2 . The observed safety profile and antitumour activity of cabazitaxel were consistent with those observed with other taxanes in similar dosing regimens. The study was registered with ClinicalTrials.gov as http://www.clinicaltrials.gov/ct2/show/NCT01755390

  10. Low-Feedback Opportunistic Scheduling Schemes for Wireless Networks with Heterogenous Users

    KAUST Repository

    Rashid, Faraan

    2012-07-01

    Efficient implementation of resource sharing strategies in a multi-user wireless environment can improve the performance of a network significantly. In this thesis we study various scheduling strategies for wireless networks and handle the problem of opportunistically scheduling transmissions using channel aware schemes. First we propose a scheme that can handle users with asymmetric channel conditions and is opportunistic in the sense that it exploits the multi-user diversity of the network. The scheme requires the users to have a priori knowledge of their channel distributions. The associated overhead is limited meaning it offers reduced feedback load, that does not scale with the increasing number of users. The main technique used to shrink the feedback load is the contention based distributed implementation of a splitting algorithm that does not require explicit feedback to the scheduler from every user. The users find the best among themselves, in a distributed manner, while requiring just a ternary broadcast feedback from the scheduler at the end of each mini-slot. In addition, it can also handle fairness constraints in time and throughput to various degrees. Next we propose another opportunistic scheduler that offers most of the benefits of the previously proposed scheme but is more practical because it can also handle heterogenous users whose channel distributions are unknown. This new scheme actually reduces the complexity and is also more robust for changing traffic patterns. Finally we extend both these schemes to the scenario where there are fixed thresholds, this enables us to handle opportunistic scheduling in practical systems that can only transmit over finite number of discrete rates with the additional benefit that full feedback session, even from the selected user, is never required.

  11. A sequential erythropoietin and GM-CSF schedule offers clinical benefits in the treatment of anaemia in myelodysplastic syndromes.

    Science.gov (United States)

    Bernell, P; Stenke, L; Wallvik, J; Hippe, E; Hast, R

    1996-08-01

    In order to reduce anaemia in patients with myelodysplastic syndromes (MDS) a stepwise treatment protocol including erythropoietin (EP) and granulocyte-macrophage colony-stimulating factor (GM-CSF) was designed. Thirty-seven MDS patients (stages I-III) with symptomatic anaemia were first given EPO 10,000 U s.c. 3 times weekly for 6 weeks. Those not responding, i.e. increased their haemoglobin levels > 15 g/l, proceeded into the second phase of the study where GM-CSF (200 micrograms/d. s.c. on weeks 1-6) was combined with EPO (10,000 U s.c. 3 times weekly on weeks 5-14). Following the initial EPO treatment phase, 14 of the 37 patients (38%) responded with increased haemoglobin levels. Responders were significantly different from non-responders in that their pre-treatment values of s-EPO, s-LDH and bone marrow blast cell counts were lower, their baseline haemoglobin levels higher and their transfusion dependency less pronounced. Eighteen of the 23 non-responders proceeded into the second phase, 13 of those were evaluable having completed the entire schedule. Three of the 13 initially EPO resistant patients (23%) responded to the GM-CSF/EPO combination with increased haemoglobin levels, suggesting a positive synergy between the two cytokines. Thus, the overall response rate to the present protocol was 46% (17 of 37 cases), but only a limited subset of the patients did clearly benefit from the combined GM-CSF/EPO administration. Therefore, we believe this step-wise approach to multiple growth factor treatment in MDS, starting with EPO alone and reserving the combination for refractory cases, has considerable advantages, taking into account both medical and socio-economical aspects.

  12. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  13. Evaluating the marginal utility principle for long-term hydropower scheduling

    International Nuclear Information System (INIS)

    Zhao, Tongtiegang; Zhao, Jianshi; Liu, Pan; Lei, Xiaohui

    2015-01-01

    Highlights: • Analysis of one-, two- and multi-period hydropower scheduling. • Derivation of marginal cost and marginal return of carry-over storage. • Evaluation of the marginal utility principle in a case study of the Three Gorges Reservoir. - Abstract: The conversion of the potential energy of dammed water into hydropower depends on both reservoir storage and release, which are the major difficulties in hydropower reservoir operation. This study evaluates the marginal utility principle, which determines the optimal carry-over storage between periods, for long-term hydropower scheduling. Increasing marginal cost and decreasing marginal return are two important characteristics that determine the marginal utility principle in water supply. However, the notion of decreasing marginal return is inapplicable in hydropower scheduling. Instead, the carry-over storage from one period has an increasing marginal contribution to the power generation in the next period. Although carry-over storage incurs an increasing marginal cost to the power generation in the current period, the marginal return is higher than the marginal cost. The marginal return from the carry-over storage further increases in the multi-period case. These findings suggest saving as much carry-over storage as possible, which is bounded by the operational constraints of storage capacity, environmental flow, and installed capacity in actual hydropower scheduling. The marginal utility principle is evaluated for a case study of the Three Gorges Reservoir, and the effects of the constraints are discussed. Results confirm the theoretical findings and show that the marginal return from carry-over storage is larger than the marginal cost. The operational constraints help determine the optimal carry-over storage.

  14. Sustainable employability in shiftwork: related to types of work schedule rather than age.

    Science.gov (United States)

    Peters, Velibor; Engels, Josephine A; de Rijk, Angelique E; Nijhuis, Frans J N

    2015-10-01

    There is scarce research on age and sustainable employability of nurses working in various types of work schedules. Earlier research showed that nurses working in work schedules differ regarding age. Different operationalisations of age might explain variations in sustainable employability. Therefore, the aim of this study was to investigate how nurses working in various types of work schedule differ regarding sustainable employability, and the role that age plays in these differences. Age was defined as chronological age, organisational age, life-span age, and functional age. Questionnaires were distributed to 974 Dutch nurses in residential elder care (response rate 51 %) with questions about the type of work schedule, aspects of sustainable employability, various operationalisations of age, and registered sickness absence data were used. Nurses working in various types of work schedules differed regarding aspects of sustainable employability, also when operationalisations of age were added. The 'life-span age' was directly related to aspects of sustainable employability. Statistically, work ability and job satisfaction were only explained by varying operationalisations of age. Nurses' sustainable employability appeared to be mainly related to differences between the types of work schedule rather than age. Fixed early shifts are characterised by the most positive aspects of sustainable employability, and three rotating schedules score worst. To improve sustainable employability, organisations should implement a system in which nurses with different types of work schedule are monitored in combination with their life-span perspective.

  15. Using equilibrium passive dosing to maintain stable exposure concentrations of triclosan in a 6-week toxicity test

    DEFF Research Database (Denmark)

    Sobek, A.; Ribbenstedt, A.; Mustajärvi, L.

    2015-01-01

    toxicity tests. Yet, the European Commission’s criteria for chemicals’ risk assessments aim at protecting higher levels in the environment. To achieve protection of populations and ecosystems, reliable long-term ecotoxicologial tests are needed. In this study, we used equilibrium passive dosing to maintain...... stable exposure concentrations of triclosan (log Kow 4.8) in a 6-week multigeneration test with the benthic copepod Nitocra spinipes. The tests were performed in 10 mL vials casted with 1000 mg of silicone (DC 1-2577). Based on a previous pilot study, three triclosan concentrations were selected...... and tested (15 μg L-1; 30 μg L-1; 60 μg L-1) as well as a control (no triclosan). At test beginning, each vial contained 12 individuals consisting of 3 individuals from four different life stages. The test includes feeding with phytoplankton three times a week, which can lead to declining freely dissolved...

  16. Self-Reported Recovery from 2-Week 12-Hour Shift Work Schedules: A 14-Day Follow-Up

    Directory of Open Access Journals (Sweden)

    Suzanne L. Merkus

    2015-09-01

    Conclusion: After 2-week 12-hour night and swing shifts, only the course for sleep quality differed from that of day work. Sleep quality was poorer for night and swing shift workers on the 1st day off and remained poorer for the 14-day follow-up. This showed that while working at night had no effect on feeling rested, tiredness, and energy levels, it had a relatively long-lasting effect on sleep quality.

  17. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  18. Effects of a 16-week hydrotherapy program on three-dimensional scapular motion and pain of women with fibromyalgia: A single-arm study.

    Science.gov (United States)

    Avila, Mariana Arias; Camargo, Paula Rezende; Ribeiro, Ivana Leão; Alburquerque-Sendín, Francisco; Zamunér, Antonio Roberto; Salvini, Tania Fatima

    2017-11-01

    Although hydrotherapy is widely used to treat women with fibromyalgia, no studies have investigated the effects of this intervention on scapular kinematics in this population. This study verified the effectiveness of a hydrotherapy program on scapular kinematics, pain and quality of life in women with fibromyalgia. Twenty women completed the study and performed three evaluations before treatment (to establish a baseline), and two other evaluations (after 8 and 16weeks of hydrotherapy) at the end of treatment. Three-dimensional kinematics of the scapula was evaluated during arm elevation in two different planes with the Flock of Birds® system. Patients also answered quality of life and Fibromyalgia Impact Questionnaires and had pain assessed with a digital algometer. Treatment consisted of 2 weekly hydrotherapy sessions, lasting 45min each, for 16weeks. Data were analyzed with a two-way ANOVA (for kinematics results) and one-way ANOVA (for the other variables). Effect size was assessed with Cohen's d coefficient for all quantitative variables. Although an important improvement was achieved in terms of pain and quality of life (P0.05, effect sizes from -0.40 to 0.46 for all kinematic variables). The proposed program of hydrotherapy was effective to improve quality of life, pain intensity and fibromyalgia impact in women with fibromyalgia. However, scapular kinematics did not change after the period of treatment. Although symptoms improved after the treatment, the lack of changes in scapular kinematics may indicate these women have an adaptive movement pattern due to their chronic painful condition. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  20. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  1. Intelligent Scheduling of a Grid-Connected Heat Pump in a Danish Detached House

    DEFF Research Database (Denmark)

    Gianniou, Panagiota; Foteinaki, Kyriaki; Heller, Alfred

    This study proposes a methodology for intelligent scheduling of a heat pump installed in a refurbished grid-connected detached house in Denmark. This scheduling is conducted through the coupling of a dynamic building simulation tool with an optimization tool. The optimization of the operation of ...... thermal comfort conditions. The proposed methodology bridges dynamic building modelling with optimization of real-time operation of HVAC systems offering a detailed model for building physics, especially regarding thermal mass and a stochastic price-based control....... of the system is based on a price-signal considering a three-day period for different weather cases. The results show that the optimal scheduling of the system is successful in terms of reducing the peak load during times when electricity prices are high, thus achieving cost savings as well as maintaining good......This study proposes a methodology for intelligent scheduling of a heat pump installed in a refurbished grid-connected detached house in Denmark. This scheduling is conducted through the coupling of a dynamic building simulation tool with an optimization tool. The optimization of the operation...

  2. Water requirement and irrigation schedule for tomato in northern guinea savanna zone, Nigeria

    Directory of Open Access Journals (Sweden)

    Ibraheem Alhassan

    2015-06-01

    Full Text Available Assessment of water requirement and irrigation schedule for tomato with the support of FAO-CROPWAT simulation model was carried out for Yola, Nigeria with the aim of planning irrigation schedules for tomato and develop recommendations for improve irrigation practices. The climatic data for 2012/2013 and soil properties of the study area were input into the program. Tomato crop properties were updated by the FAO data and three irrigation intervals were tested (7 and 10 days irrigation intervals and irrigation schedule of 10 days interval during initial and development stage and 6 days interval at mid and late season stages of tomato crop. The simulated results analysis for tomato according to the irrigation schedule showed that highest yield reduction of 16.2% was recorded with 10 days irrigation interval treatment and the least of 0.4% with irrigation interval of 10 days at first two growth stages and 6 days at last two stages. FAO-CROPWAT 8.0 can be used in planning proper irrigation schedule for tomato in Yola, Nigeria.

  3. A heuristic model for risk and cost impacts of plant outage maintenance schedule

    International Nuclear Information System (INIS)

    Mohammad Hadi Hadavi, S.

    2009-01-01

    Cost and risk are two major competing criteria in maintenance optimization problems. If a plant is forced to shutdown because of accident or fear of accident happening, beside loss of revenue, it causes damage to the credibility and reputation of the business operation. In this paper a heuristic model for incorporating three compelling optimization criteria (i.e., risk, cost, and loss) into a single evaluation function is proposed. Such a model could be used in any evaluation engine of outage maintenance schedule optimizer. It is attempted to make the model realistic and to address the ongoing challenges facing a schedule planner in a simple and commonly understandable fashion. Two simple competing schedules for the NPP feedwater system are examined against the model. The results show that while the model successfully addresses the current challenges for outage maintenance optimization, it properly demonstrates the dynamics of schedule in regards to risk, cost, and losses endured by maintenance schedule, particularly when prolonged outage and lack of maintenance for equipments in need of urgent care are of concern.

  4. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  5. Performance analysis of job scheduling policies in parallel supercomputing environments

    Energy Technology Data Exchange (ETDEWEB)

    Naik, V.K.; Squillante, M.S. [IBM T.J. Watson Research Center, Yorktown Heights, NY (United States); Setia, S.K. [George Mason Univ., Fairfax, VA (United States). Dept. of Computer Science

    1993-12-31

    In this paper the authors analyze three general classes of scheduling policies under a workload typical of largescale scientific computing. These policies differ in the manner in which processors are partitioned among the jobs as well as the way in which jobs are prioritized for execution on the partitions. Their results indicate that existing static schemes do not perform well under varying workloads. Adaptive policies tend to make better scheduling decisions, but their ability to adjust to workload changes is limited. Dynamic partitioning policies, on the other hand, yield the best performance and can be tuned to provide desired performance differences among jobs with varying resource demands.

  6. Status and schedule of J-PARC 50 GeV synchrotron

    International Nuclear Information System (INIS)

    Oogoe, Takao; Yoshioka, Masakazu; Kobayashi, Hitoshi; Takeuchi, Yasunori; Shirakata, Masashi; Shirakabe, Yoshihisa; Kuniyasu, Yuu; Oki, Hiroshi; Takiyama, Youichi

    2005-01-01

    Japan Proton Accelerator Research Complex (J-PARC) is the research complex based on three high intensity proton Accelerators: a linac, a 3 GeV synchrotron (RCS), and a 50 GeV synchrotron (MR). The construction of the MR started in 2002, and its beam commissioning is scheduled in January of 2008. The accelerator tunnel of the J-PARC 50 GeV Synchrotron is still under construction, and will be completed at the end of 2006. Installation of accelerator-components is scheduled to start in July 2005 in parallel with civil and utility construction. This document describes how to install accelerator components in the tunnel and civil engineering of the tunnel. (author)

  7. Scheduling of Irrigation and Leaching Requirements

    Directory of Open Access Journals (Sweden)

    Amer Hassan Al-haddad

    2015-03-01

    Full Text Available Iraq depends mainly on Tigris and Euphrates Rivers to provide high percentage of agricultural water use for thousands years. At last years, Iraq is suffering from shortage in water resources due to global climate changes and unfair water politics of the neighboring countries, which affected the future of agriculture plans for irrigation, added to that the lack of developed systems of water management in the irrigation projects and improper allocation of irrigation water, which reduces water use efficiency and lead to losing irrigation water and decreasing in agricultural yield. This study aims at studying the usability of irrigation and leaching scheduling within the irrigating projects and putting a complete annual or seasonal irrigation program as a solution for the scarcity of irrigation water, the increase of irrigation efficiency, lessening the salinity in the projects and preparing an integral irrigation calendar through field measurements of soil physical properties and chemical for project selected and compared to the results of the irrigation scheduling and leaching with what is proposed by the designers. The process is accomplished by using a computer program which was designed by Water Resources Department at the University of Baghdad, with some modification to generalize it and made it applicable to various climatic zone and different soil types. Study area represented by large project located at the Tigris River, and this project was (Al-Amara irrigation project. Sufficient samples of project's soil were collected so as to identify soil physical and chemical properties and the salinity of soil and water as well as identifying the agrarian cycles virtually applied to this project. Finally, a comparison was conducted between the calculated water quantities and the suggested ones by the designers. The research results showed that using this kind of scheduling (previously prepared irrigation and leaching scheduling with its properties

  8. Previous exercise training has a beneficial effect on renal and cardiovascular function in a model of diabetes.

    Directory of Open Access Journals (Sweden)

    Kleiton Augusto dos Santos Silva

    Full Text Available Exercise training (ET is an important intervention for chronic diseases such as diabetes mellitus (DM. However, it is not known whether previous exercise training intervention alters the physiological and medical complications of these diseases. We investigated the effects of previous ET on the progression of renal disease and cardiovascular autonomic control in rats with streptozotocin (STZ-induced DM. Male Wistar rats were divided into five groups. All groups were followed for 15 weeks. Trained control and trained diabetic rats underwent 10 weeks of exercise training, whereas previously trained diabetic rats underwent 14 weeks of exercise training. Renal function, proteinuria, renal sympathetic nerve activity (RSNA and the echocardiographic parameters autonomic modulation and baroreflex sensitivity (BRS were evaluated. In the previously trained group, the urinary albumin/creatinine ratio was reduced compared with the sedentary diabetic and trained diabetic groups (p<0.05. Additionally, RSNA was normalized in the trained diabetic and previously trained diabetic animals (p<0.05. The ejection fraction was increased in the previously trained diabetic animals compared with the diabetic and trained diabetic groups (p<0.05, and the myocardial performance index was improved in the previously trained diabetic group compared with the diabetic and trained diabetic groups (p<0.05. In addition, the previously trained rats had improved heart rate variability and BRS in the tachycardic response and bradycardic response in relation to the diabetic group (p<0.05. This study demonstrates that previous ET improves the functional damage that affects DM. Additionally, our findings suggest that the development of renal and cardiac dysfunction can be minimized by 4 weeks of ET before the induction of DM by STZ.

  9. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  10. WE-D-BRE-04: Modeling Optimal Concurrent Chemotherapy Schedules

    International Nuclear Information System (INIS)

    Jeong, J; Deasy, J O

    2014-01-01

    Purpose: Concurrent chemo-radiation therapy (CCRT) has become a more common cancer treatment option with a better tumor control rate for several tumor sites, including head and neck and lung cancer. In this work, possible optimal chemotherapy schedules were investigated by implementing chemotherapy cell-kill into a tumor response model of RT. Methods: The chemotherapy effect has been added into a published model (Jeong et al., PMB (2013) 58:4897), in which the tumor response to RT can be simulated with the effects of hypoxia and proliferation. Based on the two-compartment pharmacokinetic model, the temporal concentration of chemotherapy agent was estimated. Log cell-kill was assumed and the cell-kill constant was estimated from the observed increase in local control due to concurrent chemotherapy. For a simplified two cycle CCRT regime, several different starting times and intervals were simulated with conventional RT regime (2Gy/fx, 5fx/wk). The effectiveness of CCRT was evaluated in terms of reduction in radiation dose required for 50% of control to find the optimal chemotherapy schedule. Results: Assuming the typical slope of dose response curve (γ50=2), the observed 10% increase in local control rate was evaluated to be equivalent to an extra RT dose of about 4 Gy, from which the cell-kill rate of chemotherapy was derived to be about 0.35. Best response was obtained when chemotherapy was started at about 3 weeks after RT began. As the interval between two cycles decreases, the efficacy of chemotherapy increases with broader range of optimal starting times. Conclusion: The effect of chemotherapy has been implemented into the resource-conservation tumor response model to investigate CCRT. The results suggest that the concurrent chemotherapy might be more effective when delayed for about 3 weeks, due to lower tumor burden and a larger fraction of proliferating cells after reoxygenation

  11. Toxicity report of once weekly radiation therapy for low-risk prostate adenocarcinoma: preliminary results of a phase I/II trial

    International Nuclear Information System (INIS)

    Menkarios, Cathy; Fortin, Bernard; Lambert, Carole; Vigneault, Éric; Brochet, Nicolas; Nguyen, David HA; Bahary, Jean-Paul; Jolicoeur, Marjory; Beauchemin, Marie-Claude; Villeneuve, Hugo; Van Nguyen, Thu

    2011-01-01

    Increasing clinical data supports a low α/β ratio for prostate adenocarcinoma, potentially lower than that of surrounding normal tissues. A hypofractionated, weekly radiation therapy (RT) schedule should result in improved tumour control, reduced acute toxicity, and similar or decreased late effects. We report the toxicity profile of such treatment. We conducted a multi-institution phase I/II trial of three-dimensional conformal radiation therapy (3D-CRT) for favourable-risk prostate cancer (T1a-T2a, Gleason ≤ 6 and PSA < 10 ng/ml). RT consisted of 45 Gy in nine 5 Gy fractions, once weekly. Primary end-points were feasibility and late gastrointestinal (GI) toxicity (RTOG scale), while secondary end-points included acute GI toxicity, acute and late genitourinary (GU) toxicity, biochemical control, and survival. Between 2006 and 2008, 80 patients were treated. No treatment interruptions occurred. The median follow-up is 33 months (range: 20-51). Maximal grade 1, 2, and 3 acute (< 3 months) GU toxicity was 29%, 31% and 5% respectively (no grade 4). Acute GI grade 1 toxicity was reported in 30% while grade 2 occurred in 14% (no grade 3 or 4). Crude late grade ≥ 3 toxicity rates at 31 months were 2% for both GU and GI toxicity. Cumulative late grade ≥ 3 GI toxicity at 3 years was 11%. Two patients had PSA failure according to the Phoenix definition. The three-year actuarial biochemical control rate is 97%. Weekly RT with 45 Gy in 9 fractions is feasible and results in comparable toxicity. Long term tumour control and survival remain to be assessed

  12. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  13. Use of mesalazine slow release suppositories 1 g three times per week to maintain remission of ulcerative proctitis: a randomised double blind placebo controlled multicentre study

    Science.gov (United States)

    Marteau, P; Crand, J; Foucault, M; Rambaud, J

    1998-01-01

    Background—Daily administration of rectal formulations of mesalazine is effective in preventing relapse of ulcerative proctitis. Maintenance of remission with lower doses would be an advantage. 
Aim—The efficacy of mesalazine suppositories (Pentasa) 1 g three times a week v placebo to maintain remission in patients with cryptogenetic proctitis was studied. 
Methods—Ninety five patients with cryptogenetic proctitis were randomised within two weeks of remission to receive for one year or until relapse three suppositories per week of either Pentasa (n=48) or placebo (n=47). In the case of a relapse, the patients received one suppository/day. 
Results—It was found that 25 of 48 subjects v 18 of 47 remained in remission in the mesalazine and placebo groups respectively. The relapse rate was lower in the mesalazine group for the following time intervals: 0-90 days (19% v 38%, p=0.035), 0-180 days (29% v 54%, p=0.017), 0-270 days (38% v 60%, p=0.031), and 0-365 days (48% v 62%, p=0.18). Treatment of relapse with one suppository/day induced remission in 11 of 18 and 2 of 26 patients in the mesalazine and placebo groups respectively (p=0.001). Overall, 61% v 28% patients remained in the protocol and were in remission at one year (p=0.001). Tolerance was good. 
Conclusion—Mesalazine suppositories 1 g three times a week are effective for preventing relapses of cryptogenetic proctitis. Increasing the dose to 1 g/day is effective in a high proportion of subjects who relapsed. 

 Keywords: inflammatory bowel disease; mesalazine; 5-aminosalicylic acid; topical treatments; proctitis PMID:9536943

  14. A review of metaheuristic scheduling techniques in cloud computing

    Directory of Open Access Journals (Sweden)

    Mala Kalra

    2015-11-01

    Full Text Available Cloud computing has become a buzzword in the area of high performance distributed computing as it provides on-demand access to shared pool of resources over Internet in a self-service, dynamically scalable and metered manner. Cloud computing is still in its infancy, so to reap its full benefits, much research is required across a broad array of topics. One of the important research issues which need to be focused for its efficient performance is scheduling. The goal of scheduling is to map tasks to appropriate resources that optimize one or more objectives. Scheduling in cloud computing belongs to a category of problems known as NP-hard problem due to large solution space and thus it takes a long time to find an optimal solution. There are no algorithms which may produce optimal solution within polynomial time to solve these problems. In cloud environment, it is preferable to find suboptimal solution, but in short period of time. Metaheuristic based techniques have been proved to achieve near optimal solutions within reasonable time for such problems. In this paper, we provide an extensive survey and comparative analysis of various scheduling algorithms for cloud and grid environments based on three popular metaheuristic techniques: Ant Colony Optimization (ACO, Genetic Algorithm (GA and Particle Swarm Optimization (PSO, and two novel techniques: League Championship Algorithm (LCA and BAT algorithm.

  15. An original accelerated radiotherapy schedule in stage III to IV head and neck cancers. Results in a multicenter setting

    International Nuclear Information System (INIS)

    Allal, A.S.

    2000-01-01

    Background: Accelerated radiotherapy delivery has recently been shown to be effective in overcoming repopulation during fractionated radiotherapy. The therapeutic ratio may be particularly favorable for 5-week regimens. This study reports the feasibility and results of a particular accelerated schedule in Stage III to IV head and neck carcinomas used in a multicenter setting. Patients and Methods: Seventy-four patients with Stage III (26 patients) or IV (48 patients) head and neck carcinomas were treated with a 5-week accelerated schedule (69.9 to 69.8 Gy in 41 to 40 fractions over a period of 35 to 36 days). Treatment began with 20 Gy in 10 daily fractions to initial involved sites, followed by bi-fractionated radiotherapy (2x1.6 Gy to 1.66 Gy/day) to a larger head and neck volume. Thirty-six (49%) patients received induction chemotherapy (median 3 cycles, range 1 to 4 cycles). Results: Grade 3 or 4 (RTOG) confluent mucositis was observed in 57 patients (77%) and Grade 3 dysphagia in 33 patients (44%). Grade 3 or 4 (RTOG-EORTC) late complications were scored in 10.5% of cases. The 5-year actuarial locoregional control rate was 56% (95% CI: 42 to 71). The 5-year overall actuarial survival was 32% (95% CI: 18 to 46). Induction chemotherapy was not associated with a more favorable outcome. Conclusions: This study demonstrates the feasibility of this schedule in a multicenter setting. The oncologic results appear similar to those obtained by other accelerated regimens, while the rate of late complications seems acceptable. Five-week accelerated regimens warrant further evaluation, particularly in conjunction with concomitant chemotherapy, in the framework of prospective trials. (orig.) [de

  16. Changing Workplaces to Reduce Work-Family Conflict: Schedule Control in a White-Collar Organization.

    Science.gov (United States)

    Kelly, Erin L; Moen, Phyllis; Tranby, Eric

    2011-04-01

    Work-family conflicts are common and consequential for employees, their families, and work organizations. Can workplaces be changed to reduce work-family conflict? Previous research has not been able to assess whether workplace policies or initiatives succeed in reducing work-family conflict or increasing work-family fit. Using longitudinal data collected from 608 employees of a white-collar organization before and after a workplace initiative was implemented, we investigate whether the initiative affects work-family conflict and fit, whether schedule control mediates these effects, and whether work demands, including long hours, moderate the initiative's effects on work-family outcomes. Analyses clearly demonstrate that the workplace initiative positively affects the work-family interface, primarily by increasing employees' schedule control. This study points to the importance of schedule control for our understanding of job quality and for management policies and practices.

  17. A multilevel variable neighborhood search heuristic for a practical vehicle routing and driver scheduling problem

    DEFF Research Database (Denmark)

    Wen, Min; Krapper, Emil; Larsen, Jesper

    2011-01-01

    in their fresh meat supply logistics system. The problem consists of a 1‐week planning horizon, heterogeneous vehicles, and drivers with predefined work regulations. These regulations include, among other things, predefined workdays, fixed starting time, maximum weekly working duration, and a break rule......The world's second largest producer of pork, Danish Crown, also provides a fresh meat supply logistics system within Denmark. This is used by the majority of supermarkets in Denmark. This article addresses an integrated vehicle routing and driver scheduling problem arising at Danish Crown....... The objective is to minimize the total delivery cost that is a weighted sum of two kinds of delivery costs. A multilevel variable neighborhood search heuristic is proposed for the problem. In a preprocessing step, the problem size is reduced through an aggregation procedure. Thereafter, the aggregated weekly...

  18. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  19. Systematic literature review comparing rapid 3-dose administration of the GSK tick-borne encephalitis vaccine with other primary immunization schedules.

    Science.gov (United States)

    Galgani, Ilaria; Bunge, Eveline M; Hendriks, Lisa; Schludermann, Christopher; Marano, Cinzia; De Moerlooze, Laurence

    2017-09-01

    Tick-borne encephalitis (TBE), which is endemic across large regions of Europe and Asia, is most effectively prevented through vaccination. Three-dose primary TBE vaccination schedules are either rapid (0,7,21-days) or conventional (0,28-84-days, 9-12-months). The second dose can also be administered at 14 days for faster priming and sero-protection). Areas covered: We used a three-step selection process to identify 21 publications comparing the immunogenicity and/or safety of different schedules. Expert commentary: Priming with two or three TBE vaccine doses was highly immunogenic. After conventional priming (0-28 days), 95% adults and ≥95% children had neutralization test (NT) titers ≥10 at 14 days post-dose-2 compared with 92% adults and 99% children at 21 days post-dose-3 (rapid schedule). Most subjects retained NT titers ≥10 at day 300. A single booster dose induced a strong immune response in all subjects irrespective of primary vaccination schedule or elapsed time since priming. GMT peaked at 42 days post-dose-1 (i.e., 21 days post-dose 3 [rapid-schedule], or 14-28 days post-dose-2 [conventional-schedule]), and declined thereafter. Adverse events were generally rare and declined with increasing doses. In the absence of data to recommend one particular schedule, the regimen choice will remain at the physician's discretion, based on patient constraints and availability.

  20. Effectiveness of Time-Based Attention Schedules on Students in Inclusive Classrooms in Turkey

    Science.gov (United States)

    Sazak Pinar, Elif

    2015-01-01

    This study examines the effectiveness of fixed-time (FT) and variable-time (VT) schedules and attention on the problem behaviors and on-task behaviors of students with and without intellectual disabilities in inclusive classrooms in Turkey. Three second-grade students with intellectual disabilities, three students without intellectual…

  1. A subjective scheduler for subjective dedicated networks

    Science.gov (United States)

    Suherman; Fakhrizal, Said Reza; Al-Akaidi, Marwan

    2017-09-01

    Multiple access technique is one of important techniques within medium access layer in TCP/IP protocol stack. Each network technology implements the selected access method. Priority can be implemented in those methods to differentiate services. Some internet networks are dedicated for specific purpose. Education browsing or tutorial video accesses are preferred in a library hotspot, while entertainment and sport contents could be subjects of limitation. Current solution may use IP address filter or access list. This paper proposes subjective properties of users or applications are used for priority determination in multiple access techniques. The NS-2 simulator is employed to evaluate the method. A video surveillance network using WiMAX is chosen as the object. Subjective priority is implemented on WiMAX scheduler based on traffic properties. Three different traffic sources from monitoring video: palace, park, and market are evaluated. The proposed subjective scheduler prioritizes palace monitoring video that results better quality, xx dB than the later monitoring spots.

  2. Comparison of Different Approaches to the Cutting Plan Scheduling

    Directory of Open Access Journals (Sweden)

    Peter Bober

    2011-10-01

    Full Text Available Allocation of specific cutting plans and their scheduling to individual cutting machines presents a combinatorial optimization problem. In this respect, various approaches and methods are used to arrive to a viable solution. The paper reports three approaches represented by three discreet optimization methods. The first one is back-tracing algorithm and serves as a reference to verify functionality of the other two ones. The second method is optimization using genetic algorithms, and the third one presents heuristic approach to optimization based on anticipated properties of an optimal solution. Research results indicate that genetic algorithms are demanding to calculate though not dependant on the selected objective function. Heuristic algorithm is fast but dependant upon anticipated properties of the optimal solution. Hence, at change of the objective function it has to be changed. When the scheduling by genetic algorithms is solvable in a sufficiently short period of time, it is more appropriate from the practical point than the heuristic algorithm. The back-tracing algorithm usually does not provide a result in a feasible period of time.

  3. Two-Stage Multi-Objective Collaborative Scheduling for Wind Farm and Battery Switch Station

    OpenAIRE

    Zhe Jiang; Xueshan Han; Zhimin Li; Wenbo Li; Mengxia Wang; Mingqiang Wang

    2016-01-01

    In order to deal with the uncertainties of wind power, wind farm and electric vehicle (EV) battery switch station (BSS) were proposed to work together as an integrated system. In this paper, the collaborative scheduling problems of such a system were studied. Considering the features of the integrated system, three indices, which include battery swapping demand curtailment of BSS, wind curtailment of wind farm, and generation schedule tracking of the integrated system are proposed. In additio...

  4. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  5. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  6. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  7. Two new prediction rules for spontaneous pregnancy leading to live birth among subfertile couples, based on the synthesis of three previous models.

    NARCIS (Netherlands)

    C.C. Hunault; J.D.F. Habbema (Dik); M.J.C. Eijkemans (René); J.A. Collins (John); J.L.H. Evers (Johannes); E.R. te Velde (Egbert)

    2004-01-01

    textabstractBACKGROUND: Several models have been published for the prediction of spontaneous pregnancy among subfertile patients. The aim of this study was to broaden the empirical basis for these predictions by making a synthesis of three previously published models. METHODS:

  8. From non-preemptive to preemptive scheduling using synchronization synthesis.

    Science.gov (United States)

    Černý, Pavol; Clarke, Edmund M; Henzinger, Thomas A; Radhakrishna, Arjun; Ryzhyk, Leonid; Samanta, Roopsha; Tarrach, Thorsten

    2017-01-01

    We present a computer-aided programming approach to concurrency. The approach allows programmers to program assuming a friendly, non-preemptive scheduler, and our synthesis procedure inserts synchronization to ensure that the final program works even with a preemptive scheduler. The correctness specification is implicit, inferred from the non-preemptive behavior. Let us consider sequences of calls that the program makes to an external interface. The specification requires that any such sequence produced under a preemptive scheduler should be included in the set of sequences produced under a non-preemptive scheduler. We guarantee that our synthesis does not introduce deadlocks and that the synchronization inserted is optimal w.r.t. a given objective function. The solution is based on a finitary abstraction, an algorithm for bounded language inclusion modulo an independence relation, and generation of a set of global constraints over synchronization placements. Each model of the global constraints set corresponds to a correctness-ensuring synchronization placement. The placement that is optimal w.r.t. the given objective function is chosen as the synchronization solution. We apply the approach to device-driver programming, where the driver threads call the software interface of the device and the API provided by the operating system. Our experiments demonstrate that our synthesis method is precise and efficient. The implicit specification helped us find one concurrency bug previously missed when model-checking using an explicit, user-provided specification. We implemented objective functions for coarse-grained and fine-grained locking and observed that different synchronization placements are produced for our experiments, favoring a minimal number of synchronization operations or maximum concurrency, respectively.

  9. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  10. Efficacy of three-week oxytetracycline or rifampin monotherapy compared with a combination regimen against the filarial nematode Onchocerca ochengi.

    Science.gov (United States)

    Bah, Germanus S; Ward, Emma L; Srivastava, Abhishek; Trees, Alexander J; Tanya, Vincent N; Makepeace, Benjamin L

    2014-01-01

    Onchocerciasis (river blindness), caused by the filarial nematode Onchocerca volvulus, is a major cause of visual impairment and dermatitis in sub-Saharan Africa. As O. volvulus contains an obligatory bacterial symbiont (Wolbachia), it is susceptible to antibiotic chemotherapy, although current regimens are considered too prolonged for community-level control programs. The aim of this study was to compare the efficacies of oxytetracycline and rifampin, administered separately or in combination, against a close relative of O. volvulus (Onchocerca ochengi) in cattle. Six animals per group were treated with continuous or intermittent oxytetracycline regimens, and effects on adult worm viability, dermal microfilarial loads, and Wolbachia density in worm tissues were assessed. Subsequently, the efficacies of 3-week regimens of oxytetracycline and rifampin alone and a combination regimen were compared, and rifampin levels in plasma and skin were quantified. A 6-month regimen of oxytetracycline with monthly dosing was strongly adulticidal, while 3-week and 6-week regimens exhibited weaker adulticidal effects. However, all three regimens achieved >2-log reductions in microfilarial load. In contrast, rifampin monotherapy and oxytetracycline-rifampin duotherapy failed to induce substantive reductions in either adult worm burden or microfilarial load, although a borderline effect on Wolbachia density was observed following duotherapy. Dermal rifampin levels were maintained above the MIC for >24 h after a single intravenous dose. We conclude that oxytetracycline-rifampin duotherapy is less efficacious against O. ochengi than oxytetracycline alone. Further studies will be required to determine whether rifampin reduces oxytetracycline bioavailability in this system, as suggested by human studies using other tetracycline-rifampin combinations.

  11. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  12. Associations between maternal weekly air pollutant exposures and low birth weight: a distributed lag non-linear model

    Science.gov (United States)

    Wu, Han; Jiang, Baofa; Zhu, Ping; Geng, Xingyi; Liu, Zhong; Cui, Liangliang; Yang, Liping

    2018-02-01

    When discussing the association between birth weight and air pollution, previous studies mainly focus on the maternal trimester-specific exposures during pregnancy, whereas the possible associations between birth weight and weekly-specific exposures have been largely neglected. We conducted a nested 1:4 matched case-control study in Jinan, China to examine the weekly-specific associations during pregnancy between maternal fine particulate matter (aerodynamic diameter gender-, gestational age-, and parity-specific standard score (BWGAP z-score) was calculated as the outcome of interest. Distributed lag non-linear models (DLNMs) were applied to estimate weekly-specific relationship between maternal air pollutant exposures and birth weight. For an increase of per inter-quartile range in maternal PM2.5 exposure concentration during pregnancy, the BWGAP z-score decreased significantly during the 27th-33th gestational weeks with the strongest association in the 30th gestational weeks (standard deviation units decrease in BWGAP z-score: -0.049, 95% CI: -0.080 -0.017, in three-pollutant model). No significant association between maternal weekly NO2 or SO2 BWGAP z-score was observed. In conclusion, this study provides evidence that maternal PM2.5 exposure during the 27th-33th gestational weeks may reduce the birth weight in the context of very high pollution level of PM2.5.

  13. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  14. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  15. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  16. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  17. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  18. Acute and Late Toxicity in a Randomized Trial of Conventional Versus Hypofractionated Three-Dimensional Conformal Radiotherapy for Prostate Cancer

    International Nuclear Information System (INIS)

    Arcangeli, Giorgio; Fowler, Jack; Gomellini, Sara; Arcangeli, Stefano; Saracino, Biancamaria; Petrongari, Maria Grazia; Benassi, Marcello; Strigari, Lidia

    2011-01-01

    Purpose: To compare the toxicity between hypofractionation vs. conventional fractionation schedules in patients with high-risk prostate cancer. Methods and Materials: Between January 2003 and December 2007, 168 patients were randomized to receive either hypofractionated (62 Gy in 20 fractions within 5 weeks, 4 fractions/wk) or conventionally fractionated (80 Gy in 40 fractions within 8 weeks) three-dimensional conformal radiotherapy to the prostate and seminal vesicles. All patients had undergone a 9-month course of total androgen deprivation, with radiotherapy starting 2 months after initiation of the total androgen deprivation. Results: The median follow-up was 32 and 35 months in the hypofractionation and conventional fractionation arms, respectively. For the patients developing acute toxicity, no difference between the two fractionation groups was found in either severity or duration of gastrointestinal or genitourinary toxicity. Also, no difference was found in the incidence and severity of late gastrointestinal and genitourinary toxicity between the two treatment schedules, with a 3-year rate of Grade 2 or greater toxicity of 17% and 16% for the hypofractionation arm and 14% and 11% for the conventional fractionation arm, respectively. A statistically significant correlation between acute and late gastrointestinal toxicity was found only in the conventional fractionation group. Conclusion: Our findings suggest that the hypofractionation regimen used in our study is safe, with only a slight, nonsignificant increase in tolerable and temporary acute toxicity compared with the conventional fractionation schedule. The severity and frequency of late complications was equivalent between the two treatment groups.

  19. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  20. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout

  1. Prevalence of α(+)-Thalassemia in the Scheduled Tribe and Scheduled Caste Populations of Damoh District in Madhya Pradesh, Central India.

    Science.gov (United States)

    Singh, Mendi P S S; Gupta, Rasik B; Yadav, Rajiv; Sharma, Ravendra K; Shanmugam, Rajasubramaniam

    2016-08-01

    This study was carried out to ascertain the allelic frequency of α(+)-thalassemia (α(+)-thal) in Scheduled caste and scheduled tribe populations of the Damoh district of Madhya Pradesh, India. Random blood samples of Scheduled tribe (267) and Scheduled caste (168), considering the family as a sampling unit, were analyzed for the presence of the -α(3.7) (rightward) (NG_000006.1: g.34164_37967del3804) and -α(4.2) (leftward) (AF221717) deletions. α(+)-Thal was significantly higher in the Scheduled tribals (77.9%) as compared to the scheduled caste population (9.0%). About 58.0% scheduled tribals carried at least one chromosome with the -α(3.7) deletion and 20.0% scheduled tribals carried the -α(4.2) deletion. Frequency for the -α(3.7) allele was 0.487 in the scheduled tribal populations in comparison to 0.021 in scheduled castes. Allelic frequency for -α(4.2) was 0.103 and 0.024, respectively, in the above communities. No Hardy-Weinberg equilibrium for α-thal gene (p population, indicating the presence of selection pressures in favor of α-thal mutation and adaptation.

  2. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  3. Transcriptome analysis of epithelial and stromal contributions to mammogenesis in three week prepartum cows.

    Directory of Open Access Journals (Sweden)

    Theresa Casey

    Full Text Available Transcriptome analysis of bovine mammary development has provided insight into regulation of mammogenesis. However, previous studies primarily examined expression of epithelial and stromal tissues combined, and consequently did not account for tissue specific contribution to mammary development. Our objective was to identify differences in gene expression in epithelial and intralobular stromal compartments. Tissue was biopsied from non-lactating dairy cows 3 weeks prepartum, cut into explants and incubated for 2 hr with insulin and hydrocortisone. Epithelial and intralobular stromal tissues were isolated with laser capture microdissection. Global gene expression was measured with Bovine Affymetrix GeneChips, and data were preprocessed using RMA method. Moderated t-tests from gene-specific linear model analysis with cell type as a fixed effect showed more than 3,000 genes were differentially expressed between tissues (P<0.05; FDR<0.17. Analysis of epithelial and stromal transcriptomes using Database for Annotation, Visualization and Integrated Discovery (DAVID and Ingenuity Pathways Analysis (IPA showed that epithelial and stromal cells contributed distinct molecular signatures. Epithelial signatures were enriched with gene sets for protein synthesis, metabolism and secretion. Stromal signatures were enriched with genes that encoded molecules important to signaling, extracellular matrix composition and remodeling. Transcriptome differences also showed evidence for paracrine interactions between tissues in stimulation of IGF1 signaling pathway, stromal reaction, angiogenesis, neurogenesis, and immune response. Molecular signatures point to the dynamic role the stroma plays in prepartum mammogenesis and highlight the importance of examining the roles of cell types within the mammary gland when targeting therapies and studying mechanisms that affect milk production.

  4. Game injuries in relation to game schedules in the National Basketball Association.

    Science.gov (United States)

    Teramoto, Masaru; Cross, Chad L; Cushman, Daniel M; Maak, Travis G; Petron, David J; Willick, Stuart E

    2017-03-01

    Injury management is critical in the National Basketball Association (NBA), as players experience a wide variety of injuries. Recently, it has been suggested that game schedules, such as back-to-back games and four games in five days, increase the risk of injuries in the NBA. The aim of this study was to examine the association between game schedules and player injuries in the NBA. Descriptive epidemiology study. The present study analyzed game injuries and game schedules in the 2012-13 through 2014-15 regular seasons. Game injuries by game schedules and players' profiles were examined using an exact binomial test, the Fisher's exact test and the Mann-Whitney-Wilcoxon test. A Poisson regression analysis was performed to predict the number of game injuries sustained by each player from game schedules and injured players' profiles. There were a total of 681 cases of game injuries sustained by 280 different players during the three years (total N=1443 players). Playing back-to-back games or playing four games in five days alone was not associated with an increased rate of game injuries, whereas a significant positive association was found between game injuries and playing away from home (pNBA. The findings could be useful for designing optimal game schedules in the NBA as well as helping NBA teams make adjustments to minimize game injuries. Copyright © 2016 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

  5. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  6. Optimal Residential Load Scheduling Under Utility and Rooftop Photovoltaic Units

    Directory of Open Access Journals (Sweden)

    Ghulam Hafeez

    2018-03-01

    Full Text Available With the rapid advancement in technology, electrical energy consumption is increasing rapidly. Especially, in the residential sector, more than 80% of electrical energy is being consumed because of consumer negligence. This brings the challenging task of maintaining the balance between the demand and supply of electric power. In this paper, we focus on the problem of load balancing via load scheduling under utility and rooftop photovoltaic (PV units to reduce electricity cost and peak to average ratio (PAR in demand-side management. For this purpose, we adopted genetic algorithm (GA, binary particle swarm optimization (BPSO, wind-driven optimization (WDO, and our proposed genetic WDO (GWDO algorithm, which is a hybrid of GA and WDO, to schedule the household load. For energy cost estimation, combined real-time pricing (RTP and inclined block rate (IBR were used. The proposed algorithm shifts load from peak consumption hours to off-peak hours based on combined pricing scheme and generation from rooftop PV units. Simulation results validate our proposed GWDO algorithm in terms of electricity cost and PAR reduction while considering all three scenarios which we have considered in this work: (1 load scheduling without renewable energy sources (RESs and energy storage system (ESS, (2 load scheduling with RESs, and (3 load scheduling with RESs and ESS. Furthermore, our proposed scheme reduced electricity cost and PAR by 22.5% and 29.1% in scenario 1, 47.7% and 30% in scenario 2, and 49.2% and 35.4% in scenario 3, respectively, as compared to unscheduled electricity consumption.

  7. Cloning and Expression of Three New Azotobacter vinelandii Genes Closely Related to a Previously Described Gene Family Encoding Mannuronan C-5-Epimerases

    OpenAIRE

    Svanem, Britt Iren Glærum; Skjåk-Bræk, Gudmund; Ertesvåg, Helga; Valla, Svein

    1999-01-01

    The cloning and expression of a family of five modular-type mannuronan C-5-epimerase genes from Azotobacter vinelandii (algE1 to -5) has previously been reported. The corresponding proteins catalyze the Ca2+-dependent polymer-level epimerization of β-d-mannuronic acid to α-l-guluronic acid (G) in the commercially important polysaccharide alginate. Here we report the identification of three additional structurally similar genes, designated algE6, algE7, and algY. All three genes were sequenced...

  8. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  9. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  10. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  11. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  12. Development of an improved installation procedure and schedule of RVI modularization for APR1400

    International Nuclear Information System (INIS)

    Ko, Do Young

    2011-01-01

    The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule

  13. An integrated modeling framework for real-time irrigation scheduling: the benefit of spectroscopy and weather forecasts

    Science.gov (United States)

    Brook, Anna; Polinova, Maria; Housh, Mashor

    2016-04-01

    and short-term weekly forecasts. In order to optimize the water resource use, the irrigation scheduling will be defined by use a simulation model of soil-plant and atmosphere system (e.g. SWAP model, Van Dam et al., 2008). The use of this tool is necessary to: i) take into account the soil spatial variability; ii) to predict the system behaviour under the forecasted climate; iii) define the optimized irrigation water volumes. Given this knowledge in the three domains of optimization under uncertainty, spectroscopy/remote sensing and climate forecasting, we will be presented as an integrated framework for deriving optimal irrigation decisions. References Nelson, Gerald C., et al. Climate change: Impact on agriculture and costs of adaptation. Vol. 21. Intl Food Policy Res Inst, 2009. Housh, Mashor, Avi Ostfeld, and Uri Shamir. "Seasonal multi-year optimal management of quantities and salinities in regional water supply systems." Environmental Modelling & Software 37 (2012): 55-67. Wang, Dingbao, and Ximing Cai. "Irrigation scheduling - Role of weather forecasting and farmers' behavior." Journal of Water Resources Planning and Management 135.5 (2009): 364-372. Van Dam, J. C., et al. SWAP version 3.2: Theory description and user manual. No. 1649. Wageningen, The Netherlands: Alterra, 2008.

  14. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  15. A consideration of distributions and treatment schedules in high dose rate intracavitary therapy of carcinoma of the uterine cervix

    International Nuclear Information System (INIS)

    Sakata, Suoh; Sato, Sigehiro; Nakano, Masao; Iida, Koyo; Yui, Nobuharu

    1979-01-01

    A remotely controlled afterloading device for high dose rate intracavitary radiation, the remote afterloader Shimadzu Ralstron MTSW-20, was installed at Chiba Cancer Center Hospital in 1973 and put into clinical use for the treatment of carcinoma of the uterine cervix. Before the clinical use, isodose distributions and treatment schedules were investigated, compared with the low dose rate intracavitary radiation by linear sources of 137 Cs used hitherto. The isodose distributions, calculated by using an electronic computer, for various combinations of the length of uterine canal and the separation of vaginal applicators, were the same as those obtained with linear sources. As for the treatment schedules, by using PT (partial tolerance) which was derived from NSD concept of Ellis, a number of fractional radiation regimes with high dose rate, equivalent to continuous low dose rate radiation, was calculated. From these, a dose of 600 rad per fraction to point A every week has been chosen as the standard radiation schedule. The number of fractions has been varied with the clinical stages. Furthermore, some changes of total dose or small modification of dose distribution have been made for individual lesions. According to the preliminary results, three-year cumulative survival rate was 68.7% and complication rate was 15.2%. Comparing these results with those of the treatment at low dose rate, the former is nearly equal, while the latter is lower. The reduction of complication rate is probably due to the improvement of therapeutic techniques such as continuous observation by fractionated intracavitary radiation, variety of isodose distributions and accuracy of source placement by a short treatment time. (author)

  16. Interruption of scheduled, automatic feeding and reduction of excess energy intake in toddlers

    Directory of Open Access Journals (Sweden)

    Ciampolini M

    2013-01-01

    Full Text Available Mario Ciampolini,1 J Thomas Brenna,2 Valerio Giannellini,3 Stefania Bini11Preventive Gastroenterology Unit, Department of Paediatrics, Università di Firenze, Florence, Italy; 2Division of Nutritional Sciences, Cornell University, Ithaca, NY, USA; 3Department of Pharmaceutical Sciences, Università di Firenze, Florence, ItalyBackground: Childhood obesity due to the consumption of excess calories is a severe problem in developed countries. In a previous investigation on toddlers, hospital laboratory measurements showed an association of food-demand behavior with constant lower blood glucose before meals than for scheduled meals. We hypothesize that maternal scheduling of meals for toddlers results in excess energy intake compared to feeding only on demand (previously “on request”.Objective: We tested the cross-sectional null hypothesis of no difference in energy intake between scheduled (automatic and demanded meals (administered after evaluation in 24 mother–toddler (21 months old at entry pairs with chronic, nonspecific diarrhea presenting at a clinic. We tested the same hypothesis in a subset of 14 toddlers by measuring the resting (sleeping metabolic rate 4 hours after lunch, as well as the total daily energy expenditure (TEE in 10 toddlers.Methods: We trained mothers to recognize meal demands (as in the previous investigation and to provide food in response, but required no blood glucose measurements before meals. Energy intake was assessed by a 10-day food diary, resting metabolic rate (RMR by respiratory analyses (indirect calorimetry in 14 toddlers, and TEE by doubly labeled water in 10 toddlers. Their blood parameters, anthropometry, and number of days with diarrhea were assessed before training and 50 days after training.Results: RMR decreased from 58.6 ± 7.8 to 49.0 ± 9.1 kcal/kg/d (P < 0.001 and TEE decreased from 80.1 ± 6.9 to 67.8 ± 10.0 kcal/kg/d (P < 0.001. Energy intake decreased from 85.7 ± 15.3 to 70.3 ± 15.8 kcal

  17. Impact of Scheduling Flexibility on Demand Profile Flatness and User Inconvenience in Residential Smart Grid System

    Directory of Open Access Journals (Sweden)

    Naveed Ul Hassan

    2013-12-01

    Full Text Available The objective of this paper is to study the impact of scheduling flexibility on both demand profile flatness and user inconvenience in residential smart grid systems. Temporal variations in energy consumption by end users result in peaks and troughs in the aggregated demand profile. In a residential smart grid, some of these peaks and troughs can be eliminated through appropriate load balancing algorithms. However, load balancing requires user participation by allowing the grid to re-schedule some of their loads. In general, more scheduling flexibility can result in more demand profile flatness, however the resulting inconvenience to users would also increase. In this paper, our objective is to help the grid determine an appropriate amount of scheduling flexibility that it should demand from users, based on which, proper incentives can be designed. We consider three different types of scheduling flexibility (delay, advance scheduling and flexible re-scheduling in flexible loads and develop both optimal and sub-optimal scheduling algorithms. We discuss their implementation in centralized and distributed manners. We also identify the existence of a saturation point. Beyond this saturation point, any increase in scheduling flexibility does not significantly affect the flatness of the demand profile while user inconvenience continues to increase. Moreover, full participation of all the households is not required since increasing user participation only marginally increases demand profile flatness.

  18. A Baseline Load Schedule for the Manual Calibration of a Force Balance

    Science.gov (United States)

    Ulbrich, N.; Gisler, R.

    2013-01-01

    A baseline load schedule for the manual calibration of a force balance is defined that takes current capabilities at the NASA Ames Balance Calibration Laboratory into account. The chosen load schedule consists of 18 load series with a total of 194 data points. It was designed to satisfy six requirements: (i) positive and negative loadings should be applied for each load component; (ii) at least three loadings should be applied between 0 % and 100 % load capacity; (iii) normal and side force loadings should be applied at the forward gage location, aft gage location, and the balance moment center; (iv) the balance should be used in "up" and "down" orientation to get positive and negative axial force loadings; (v) the constant normal and side force approaches should be used to get the rolling moment loadings; (vi) rolling moment loadings should be obtained for 0, 90, 180, and 270 degrees balance orientation. In addition, three different approaches are discussed in the paper that may be used to independently estimate the natural zeros, i.e., the gage outputs of the absolute load datum of the balance. These three approaches provide gage output differences that can be used to estimate the weight of both the metric and non-metric part of the balance. Data from the calibration of a six-component force balance will be used in the final manuscript of the paper to illustrate characteristics of the proposed baseline load schedule.

  19. Concurrent processes scheduling with scarce resources in small and medium enterprises

    Institute of Scientific and Technical Information of China (English)

    马嵩华

    2016-01-01

    Scarce resources , precedence and non-determined time-lag are three constraints commonly found in small and medium manufacturing enterprises (SMEs), which are deemed to block the ap-plication of workflow management system ( WfMS ) .To tackle this problem , a workflow scheduling approach is proposed based on timing workflow net (TWF-net) and genetic algorithm (GA).The workflow is modelled in a form of TWF-net in favour of process simulation and resource conflict checking .After simplifying and reconstructing the set of workflow instance , the conflict resolution problem is transformed into a resource-constrained project scheduling problem ( RCPSP ) , which could be efficiently solved by a heuristic method , such as GA.Finally, problems of various sizes are utilized to test the performance of the proposed algorithm and to compare it with first-come-first-served ( FCFS) strategy.The evaluation demonstrates that the proposed method is an overwhelming and effective approach for scheduling the concurrent processes with precedence and resource con -straints .

  20. A Framework for Uplink Intercell Interference Modeling with Channel-Based Scheduling

    KAUST Repository

    Tabassum, Hina

    2012-12-29

    This paper presents a novel framework for modeling the uplink intercell interference(ICI) in a multiuser cellular network. The proposed framework assists in quantifying the impact of various fading channel models and state-of-the-art scheduling schemes on the uplink ICI. Firstly, we derive a semianalytical expression for the distribution of the location of the scheduled user in a given cell considering a wide range of scheduling schemes. Based on this, we derive the distribution and moment generating function (MGF) of the uplink ICI considering a single interfering cell. Consequently, we determine the MGF of the cumulative ICI observed from all interfering cells and derive explicit MGF expressions for three typical fading models. Finally, we utilize the obtained expressions to evaluate important network performance metrics such as the outage probability, ergodic capacity, and average fairness numerically. Monte-Carlo simulation results are provided to demonstrate the efficacy of the derived analytical expressions.

  1. On the Road to Improved Scheduling: Reducing the Effects of Variation in Duration

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2013-01-01

    Scheduling in onsite construction is based on commitments. Unmet commitments result in non-completions which leads to waste. Moreover, it is important that commitments are realistic to avoid both positive and negative variation in duration. Negative variation is destructive to plans and schedules...... and results in delays, while positive variation is destructive to productivity by creating unexploited gaps between activities, thus inducing unexploited capacity. By registering non-completion at three construction sites, the magnitude of activities inducing negative variation has been mapped. In total, 5424...

  2. Dosimetric comparison of standard three-dimensional conformal radiotherapy followed by intensity-modulated radiotherapy boost schedule (sequential IMRT plan) with simultaneous integrated boost-IMRT (SIB IMRT) treatment plan in patients with localized carcinoma prostate.

    Science.gov (United States)

    Bansal, A; Kapoor, R; Singh, S K; Kumar, N; Oinam, A S; Sharma, S C

    2012-07-01

    DOSIMETERIC AND RADIOBIOLOGICAL COMPARISON OF TWO RADIATION SCHEDULES IN LOCALIZED CARCINOMA PROSTATE: Standard Three-Dimensional Conformal Radiotherapy (3DCRT) followed by Intensity Modulated Radiotherapy (IMRT) boost (sequential-IMRT) with Simultaneous Integrated Boost IMRT (SIB-IMRT). Thirty patients were enrolled. In all, the target consisted of PTV P + SV (Prostate and seminal vesicles) and PTV LN (lymph nodes) where PTV refers to planning target volume and the critical structures included: bladder, rectum and small bowel. All patients were treated with sequential-IMRT plan, but for dosimetric comparison, SIB-IMRT plan was also created. The prescription dose to PTV P + SV was 74 Gy in both strategies but with different dose per fraction, however, the dose to PTV LN was 50 Gy delivered in 25 fractions over 5 weeks for sequential-IMRT and 54 Gy delivered in 27 fractions over 5.5 weeks for SIB-IMRT. The treatment plans were compared in terms of dose-volume histograms. Also, Tumor Control Probability (TCP) and Normal Tissue Complication Probability (NTCP) obtained with the two plans were compared. The volume of rectum receiving 70 Gy or more (V > 70 Gy) was reduced to 18.23% with SIB-IMRT from 22.81% with sequential-IMRT. SIB-IMRT reduced the mean doses to both bladder and rectum by 13% and 17%, respectively, as compared to sequential-IMRT. NTCP of 0.86 ± 0.75% and 0.01 ± 0.02% for the bladder, 5.87 ± 2.58% and 4.31 ± 2.61% for the rectum and 8.83 ± 7.08% and 8.25 ± 7.98% for the bowel was seen with sequential-IMRT and SIB-IMRT plans respectively. For equal PTV coverage, SIB-IMRT markedly reduced doses to critical structures, therefore should be considered as the strategy for dose escalation. SIB-IMRT achieves lesser NTCP than sequential-IMRT.

  3. Iodine-131 induced hepatotoxicity in previously healthy patients with Grave's disease.

    Science.gov (United States)

    Jhummon, Navina Priya; Tohooloo, Bhavna; Qu, Shen

    2013-01-01

    To describe the association of the rare and serious complication of liver toxicity in previously healthy Grave's disease (GD) patients after the treatment with radioactive iodine (131)I (RAI). We report the clinical, laboratory and pathologic findings of 2 cases of severe liver toxicity associated with the treatment with RAI in previously healthy patients with GD. Clinical examination and laboratory investigations excluded viral hepatitis, autoimmune hepatitis, granulomatous disease, primary biliary disease, extrahepatic biliary obstruction, and heart failure. Case 1: A previously healthy 52-years old man reportedly having a typical GD but following RAI treatment, concomitantly developed severe liver toxicity that required 1 week of treatment in hospital. Case 2: A previously healthy 34-years old woman is reported as having a typical GD but developed jaundice following RAI treatment that required several weeks of in hospital treatment in the hepato-biliary department. In both cases, the liver dysfunction resolved after intensive treatment with hepato-protective agents. In this report the therapeutic considerations as well as the pathogenetic possibilities are reviewed. To the best of our knowledge, this is the first description of the association observed, which is rare but may be severe and should be considered in any case of thyrotoxicosis where a liver dysfunction develops after the treatment with radioactive iodine (131)I.

  4. Pilot Study of an Individualised Early Postpartum Intervention to Increase Physical Activity in Women with Previous Gestational Diabetes

    Directory of Open Access Journals (Sweden)

    Harold David McIntyre

    2012-01-01

    Full Text Available Optimal strategies to prevent progression towards overt diabetes in women with recent gestational diabetes remain ill defined. We report a pilot study of a convenient, home based exercise program with telephone support, suited to the early post-partum period. Twenty eight women with recent gestational diabetes were enrolled at six weeks post-partum into a 12 week randomised controlled trial of Usual Care (n=13 versus Supported Care (individualised exercise program with regular telephone support; n=15. Baseline characteristics (Mean ± SD were: Age  33±4  years; Weight 80 ± 20 kg and Body Mass Index (BMI 30.0±9.7 kg/m2. The primary outcome, planned physical activity {Median (Range}, increased by 60 (0–540 mins/week in the SC group versus 0 (0–580 mins/week in the UC group (P=0.234. Walking was the predominant physical activity. Body weight, BMI, waist circumference, % body fat, fasting glucose and insulin did not change significantly over time in either group. This intervention designed to increase physical activity in post-partum women with previous gestational diabetes proved feasible. However, no measurable improvement in metabolic or biometric parameters was observed over a three month period.

  5. Runway Scheduling Using Generalized Dynamic Programming

    Science.gov (United States)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  6. Ad libitum or demand/semi-demand feeding versus scheduled interval feeding for preterm infants.

    Science.gov (United States)

    McCormick, Felicia M; Tosh, Karen; McGuire, William

    2010-02-17

    Scheduled interval feeding of prescribed enteral volumes is current standard practice for preterm infants. However, feeding preterm infants in response to their hunger and satiation cues (ad libitum or demand/semi demand) rather than at scheduled intervals might help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge. To assess the effect of a policy of feeding preterm infants on an ad libitum or demand/semi-demand basis versus feeding prescribed volumes at scheduled intervals on growth rates and the time to hospital discharge. We used the standard search strategy of the Cochrane Neonatal Review Group. This included searches of the Cochrane Central Register of Controlled Trials (CENTRAL, The Cochrane Library, Issue 4, 2009), MEDLINE (1966 to Oct 2009), EMBASE (1980 to Oct 2009), CINAHL (1982 to Oct 2009), conference proceedings, and previous reviews. Randomised or quasi-randomised controlled trials (including cluster randomised trials) that compared a policy of feeding preterm infants on an ad libitum or demand/semi-demand basis versus feeding at scheduled intervals. We used the standard methods of the Cochrane Neonatal Review Group with separate evaluation of trial quality and data extraction by two review authors. We found eight randomised controlled trials that compared ad libitum or demand/semi-demand regimens with scheduled interval regimes in preterm infants in the transition phase from intragastric tube to oral feeding. The trials were generally small and of variable methodological quality. The duration of the intervention and the duration of data collection and follow-up in most of the trials was not likely to have allowed detection of measurable effects on growth. Three trials reported that feeding preterm infants using an ad libitum or demand/semi-demand feeding regimen allowed earlier discharge from hospital (by about two to four days) but other trials did not confirm this

  7. Special immunobiologicals’ schedule applied to infants at a reference service in Ceará

    Directory of Open Access Journals (Sweden)

    Joselany Áfio Caetano

    2010-06-01

    Full Text Available Objective: To analyze the vaccine schedule for preterm infants in a program of special immunobiologicals. Methods: A documental study conducted at a Reference Center of Special Immunobiologicals (CREATE situated in a general hospital of tertiary care in pediatrics. The sample consisted of 112 newborns with gestational age below 37 weeks and weighing less than 2500g, suitable for vaccination, assisted in 2006-2007. Data collection was done from registration forms, reference records and registers of control of special immunobiologicals’ administration, in year 2008. Results: The results showed that 22 (20% newborns were weighing between 1000 and 1499g. Regarding gestational age, 39 (35% were born between 30 and 34 weeks of pregnancy. Most proceeded from public institutions, 37 (69%. The vaccination schedule of most children, 68 (61%, was incomplete. The main clinical indications for special immunobiologicals were prematurity and bronchopulmonary dysplasia. It was observed that 89% (n = 100 of preterm infants received the pneumococcal vaccine (Prevenar. For preterm infants who were at risk of developing serious events related to the tetravalent vaccine, it was elected the scheme Prevenar + DTPa + Hib. Simultaneous administration of meningococcal conjugate vaccines - C (MncC with Prevenar was indicated for candidates for cochlear implants. Conclusion: The integral care to the preterm newborn involves early immunization, that is, the one that starts in the neonatal unit, and requires the inclusion of special immunobiologicals, which should be criteriously recommended.

  8. [Immunisation schedule of the Spanish Association of Paediatrics: 2018 recommendations].

    Science.gov (United States)

    Moreno-Pérez, David; Álvarez García, Francisco José; Álvarez Aldeán, Javier; Cilleruelo Ortega, María José; Garcés Sánchez, María; García Sánchez, Nuria; Hernández Merino, Ángel; Méndez Hernández, María; Merino Moína, Manuel; Montesdeoca Melián, Abián; Ruiz-Contreras, Jesús

    2018-01-01

    The Advisory Committee on Vaccines of the Spanish Association of Paediatrics annually publishes the immunisation schedule considered optimal for children resident in Spain, according to available evidence on current vaccines. Regarding funded immunisations, 2+1 strategy (2, 4, 11-12 months) with hexavalent (DTPa-IPV-Hib-HB) and 13-valent pneumococcal vaccines are recommended. Administration of the 6-year booster dose with DTPa is recommended, and a poliomyelitis dose for children who had received the 2+1 scheme, as well as Tdap vaccine for adolescents and pregnant women in every pregnancy between 27 and 32 weeks' gestation. The two-dose scheme should be used for MMR (12 months and 2-4 years) and varicella (15 months and 2-4 years). MMRV vaccine could be applied as the second dose if available. Coverage of human papillomavirus vaccination in girls aged 12 with a two dose scheme (0, 6 months) should be improved. Information and recommendation for male adolescents about potential beneficial effects of this immunisation should be provided as well. The new 9 genotypes vaccine is now available, expanding the coverage for both gender. Regarding non-funded immunisations, Committee on Vaccines of the Spanish Association of Paediatrics recommends meningococcal B vaccination, with a 3+1 schedule, and requests to be included in the National Immunisation Program. Tetravalent meningococcal vaccine (MenACWY) is recommended to adolescents (14-18 years) who are going to live in countries with systematic vaccination against ACWY serogroups, and people >6 weeks of age with risk factors or travellers to countries with very high incidence. Vaccination against rotavirus is recommended in all infants. Copyright © 2017 Asociación Española de Pediatría. Publicado por Elsevier España, S.L.U. All rights reserved.

  9. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.

  10. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  11. Schedule-Dependent Antiangiogenic and Cytotoxic Effects of Chemotherapy on Vascular Endothelial and Retinoblastoma Cells.

    Directory of Open Access Journals (Sweden)

    Ursula Winter

    Full Text Available Current treatment of retinoblastoma involves using the maximum dose of chemotherapy that induces tumor control and is tolerated by patients. The impact of dose and schedule on the cytotoxicity of chemotherapy has not been studied. Our aim was to gain insight into the cytotoxic and antiangiogenic effect of the treatment scheme of chemotherapy used in retinoblastoma by means of different in vitro models and to evaluate potential effects on multi-drug resistance proteins. Two commercial and two patient-derived retinoblastoma cell types and two human vascular endothelial cell types were exposed to increasing concentrations of melphalan or topotecan in a conventional (single exposure or metronomic (7-day continuous exposure treatment scheme. The concentration of chemotherapy causing a 50% decrease in cell proliferation (IC50 was determined by MTT and induction of apoptosis was evaluated by flow cytometry. Expression of ABCB1, ABCG2 and ABCC1 after conventional or metronomic treatments was assessed by RT-qPCR. We also evaluated the in vivo response to conventional (0.6 mg/kg once a week for 2 weeks and metronomic (5 days a week for 2 weeks topotecan in a retinoblastoma xenograft model. Melphalan and topotecan were cytotoxic to both retinoblastoma and endothelial cells after conventional and metronomic treatments. A significant decrease in the IC50 (median, 13-fold; range: 3-23 was observed following metronomic chemotherapy treatment in retinoblastoma and endothelial cell types compared to conventional treatment (p0.05. In mice, continuous topotecan lead to significantly lower tumor volumes compared to conventional treatment after 14 days of treatment (p<0.05. Continuous exposure to melphalan or topotecan increased the chemosensitivity of retinoblastoma and endothelial cells to both chemotherapy agents with lower IC50 values compared to short-term treatment. These findings were validated in an in vivo model. None of the dosing modalities induced

  12. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  13. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  14. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  15. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  16. Job shop scheduling problem with late work criterion

    Science.gov (United States)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  17. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  18. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  19. A comparison of morbidity associated with placenta previa with and without previous caesarean sections

    International Nuclear Information System (INIS)

    Baqai, S.; Siraj, A.; Noor, N.

    2018-01-01

    To compare the morbidity associated with placenta previa with and without previous caesarean sections. Study Design: Retrospective comparative study. Place and Duration of Study: From March 2014 till March 2016 in the department of Obstetrics and Gynaecology at PNS Shifa hospital Karachi. Material and Methods: After the approval from hospital ethical committee, antenatal patients with singleton pregnancy of gestational age >32 weeks, in the age group of 20-40 years diagnosed to have placenta previa included in the study. All patients with twin pregnancy less than 20 years and more than 40 years of age were excluded. The records of all patients fulfilling the inclusion criteria were reviewed. Data had been collected for demographic and maternal variables, placenta previa, history of previous lower segment caesarean section (LSCS), complications associated with placenta previa and techniques used to control blood loss were recorded. Results: During the study period, 6879 patients were delivered in PNS Shifa, out of these, 2060 (29.9%) had caesarean section out of these, 47.3% patients had previous history of LSCS. Thirty three (1.6%) patients were diagnosed to have placenta previa and frequency of placenta previa was significantly higher in patients with previous history of LSCS than previous normal delivery of LSCS i.e. 22 vs. 11 (p=0.023). It was observed that the frequency of morbidly adherent placenta (MAP) and Intensive care unit (ICU) stay were significantly higher in patients with previous history of LSCS than previous history of normal delivery. Conclusion: Frequency of placenta previa was significantly higher in patients with history of LSCS. Also placenta previa remains a major risk factor for various maternal complications. (author)

  20. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  1. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  2. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  3. Muscle damage, inflammatory, immune and performance responses to three football games in 1 week in competitive male players

    DEFF Research Database (Denmark)

    Mohr, Magni; Draganidis, Dimitrios; Chatzinikolaou, Athanasios

    2016-01-01

    PURPOSE: We examined effects of a three-game, 1-week microcycle (G1, G2, G3) on recovery of performance and inflammatory responses in professional male footballers. METHODS: Players were randomized into an experimental (EXP; N = 20) and a control group (CON; N = 20). Blood was drawn and repeated....... In EXP, game play increased muscle soreness (~sevenfold) compared to CON with G2 inducing the greatest rise, while KJRM was attenuated post-game in EXP compared to CON (5-7 %) and recovered slower post G2 and G3 than G1. CK, CRP, sVCAM-1, sP-Selectin and cortisol peaked 48 h post-games with G2 eliciting...

  4. Techniques for establishing schedules with wheel running as reinforcement in rats.

    Science.gov (United States)

    Iversen, I H

    1993-07-01

    In three experiments, access to wheel running was contingent on lever pressing. In each experiment, the duration of access to running was reduced gradually to 4, 5, or 6 s, and the schedule parameters were expanded gradually. The sessions lasted 2 hr. In Experiment 1, a fixed-ratio 20 schedule controlled a typical break-and-run pattern of lever pressing that was maintained throughout the session for 3 rats. In Experiment 2, a fixed-interval schedule of 6 min maintained lever pressing throughout the session for 3 rats, and for 1 rat, the rate of lever pressing was positively accelerated between reinforcements. In Experiment 3, a variable-ratio schedule of 20 or 35 was in effect and maintained lever pressing at a very stable pace throughout the session for 2 of 3 rats; for 1 rat, lever pressing was maintained at an irregular rate. When the session duration was extended to successive 24-hr periods, with food and water accessible in Experiment 3, lever pressing settled into a periodic pattern occurring at a high rate at approximately the same time each day. In each experiment, the rats that developed the highest local rates of running during wheel access also maintained the most stable and highest rates of lever pressing.

  5. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  6. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  7. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance.

    Science.gov (United States)

    Carter, Christine E; Grahn, Jessica A

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the "contextual interference effect." While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule

  8. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance

    Science.gov (United States)

    Carter, Christine E.; Grahn, Jessica A.

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the “contextual interference effect.” While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule

  9. Efficient Feasibility Analysis for Real-Time Systems with EDF Scheduling

    OpenAIRE

    Albers , Karsten; Slomka , Frank

    2005-01-01

    Submitted on behalf of EDAA (http://www.edaa.com/); International audience; This paper presents new fast exact feasibility tests for uniprocessor real-time systems using preemptive EDF scheduling. Task sets which are accepted by previously described sufficient tests will be evaluated in nearly the same time as with the old tests by the new algorithms. Many task sets are not accepted by the earlier tests despite them beeing feasible. These task sets will be evaluated by the new algorithms a lo...

  10. Progress Monitoring in Reading: Comparison of Weekly, Bimonthly, and Monthly Assessments for Students at Risk for Reading Difficulties in Grades 2-4

    Science.gov (United States)

    January, Stacy-Ann A.; Van Norman, Ethan R.; Christ, Theodore J.; Ardoin, Scott P.; Eckert, Tanya L.; White, Mary Jane

    2018-01-01

    The present study examined the utility of two progress monitoring assessment schedules (bimonthly and monthly) as alternatives to monitoring once weekly with curriculum-based measurement in reading (CBM-R). General education students (N = 93) in Grades 2-4 who were at risk for reading difficulties but not yet receiving special education services…

  11. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  12. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  13. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  14. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  15. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  16. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  17. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  18. Changes in morphology and strength following an eight week ...

    African Journals Online (AJOL)

    The purpose of the current investigation was to determine the impact of eight weeks of progressive resistance exercise on strength and morphology of previously sedentary, healthy, post-menopausal women. Six women were recruited from the Grahamstown community in the Eastern Cape, South Africa. Recruits were ...

  19. Pain relief and quality of life following radiotherapy for bone metastases: a randomised trial of two fractionation schedules

    International Nuclear Information System (INIS)

    Gaze, Mark N.; Kelly, Charles G.; Kerr, Gillian R.; Cull, Ann; Cowie, Valerie J.; Gregor, Anna; Howard, Grahame C.W.; Rodger, Alan

    1997-01-01

    Background: The optimum dose and fractionation schedule for the palliative irradiation of painful bone metastases is controversial. Purpose: To compare the efficacy, side-effects and effect on quality of life of two commonly used radiotherapy schedules in the management of painful bone metastases. Materials and methods: In a prospective trial, 280 patients were randomised to receive either a single 10 Gy treatment or a course of 22.5 Gy in five daily fractions for the relief of localised metastatic bone pain. Results: Response rates have been calculated from 240 assessable treated sites of pain. The overall response rates were 83.7% (single treatment) and 89.2% (five fractions). The complete response rates were 38.8% (single treatment) and 42.3% (five fractions). The median duration of pain control was 13.5 weeks (single treatment) and 14.0 weeks (five fractions). None of these differences was statistically significant. There were no differences between the groups in the effect of treatment on a variety of quality of life parameters. Conclusions: It is concluded that a single 10 Gy treatment is as effective as a course of 22.5 Gy in five fractions in the management of painful bone metastases

  20. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...