WorldWideScience

Sample records for previously installed rogowski

  1. Rogowski Loop design for NSTX

    International Nuclear Information System (INIS)

    McCormack, B.; Kaita, R.; Kugel, H.; Hatcher, R.

    2000-01-01

    The Rogowski Loop is one of the most basic diagnostics for tokamak operations. On the National Spherical Torus Experiment (NSTX), the plasma current Rogowski Loop had the constraints of the very limited space available on the center stack, 5,000 volt isolation, flexibility requirements as it remained a part of the Center Stack assembly after the first phase of operation, and a +120 C temperature requirement. For the second phase of operation, four Halo Current Rogowski Loops under the Center Stack tiles will be installed having +600 C and limited space requirements. Also as part of the second operational phase, up to ten Rogowski Loops will installed to measure eddy currents in the Passive Plate support structures with +350 C, restricted space, and flexibility requirements. This presentation will provide the details of the material selection, fabrication techniques, testing, and installation results of the Rogowski Loops that were fabricated for the high temperature operational and bakeout requirements, high voltage isolation requirements, and the space and flexibility requirements imposed upon the Rogowski Loops. In the future operational phases of NSTX, additional Rogowski Loops could be anticipated that will measure toroidal plasma currents in the vacuum vessel and in the Passive Plate assemblies

  2. Development of the ITER Continuous External Rogowski: From conceptual design to final design

    Energy Technology Data Exchange (ETDEWEB)

    Moreau, Philippe, E-mail: philippe.jacques.moreau@cea.fr [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Spuig, Pascal; Le-luyer, Alain; Malard, Philippe; Cantone, Bruno; Pastor, Patrick; Saint-Laurent, François [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Vayakis, George; Delhom, Dominique [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Arshad, Shakeib [Fusion for Energy, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Lister, Jonathan; Toussaint, Matthieu; Marmillod, Philippe; Testa, Duccio; Schlatter, Christian [Ecole polytechnique fédérale de Lausanne, Centre de Recherches en Physique des Plasmas, 1015 Lausanne (Switzerland); Peruzzo, Simone [Consorzio RFX, C.so Stati Uniti 4, 35127 Padova (Italy)

    2015-10-15

    Highlights: • ITER Continuous External Rogowskis are designed for plasma current measurement. • CER are located in the casing of Toroidal Field Coils and will operate at 4.5 K. • The design of the sensors has been completed and validated through prototypes. • Detailed assembly procedure inside the toroidal field coil casing has been defined. • The CER has passed all the ITER and F4E design review procedures. - Abstract: In ITER, an accurate measurement of plasma current, with high reliability, is mandatory as this parameter is used to demonstrate licensing compliance with regulatory limits. For that purpose, several independent measurements based on magnetic diagnostics have been proposed. Rogowski coils are standard inductive sensors for current measurement in many applications. In ITER, three continuous external Rogowski coils are to be installed in the casing of the toroidal field coils. These sensors are remarkable from several points of view: overall length is about 40 m, high sensitivity needed, located in the toroidal field coil casing at 4.5 K and complex 3D routing with tight bending radius of 50 mm. Since 2005 an extensive work has been carried out to develop and analyze several design options complying with ITER specifications. Prototypes of a selected continuous external Rogowski design were built and tested successfully in terms of electrical, thermal, mechanical and vacuum characteristics. Finally a detailed assembly procedure inside the toroidal field coil casing has been defined according to the coil manufacturing and assembly constraints.

  3. Zero current measurements using the Rogowski coil

    International Nuclear Information System (INIS)

    Gregor, J.; Jakubova, I.; Kadlec, P.; Senk, J.; Vavra, Z.

    1997-01-01

    The zero current measurements using the Rogowski coil carried out on the model of the extinguishing chamber of hv SF 6 circuit breaker with self-flow generation are presented in the paper. The time course of the post-arc current obtained by numerical integration of the measured induced voltage of the Rogowski coil gives information not only about the value of the residual current after the successful interruption but also about the current changes connected with the dynamic behaviour of the arc during its quenching. (author)

  4. Research on Harmonic Characteristic of Electronic Current Transformer Based on the Rogowski Coil

    Science.gov (United States)

    Shen, Diqiu; Hu, Bei; Wang, Xufeng; Zhu, Mingdong; Wang, Liang; Lu, Wenxing

    2017-05-01

    The nonlinear load present in the power system will cause the distortion of AC sine wave and generate the harmonic, which havea severe impact on the accuracy of energy metering and reliability of relay protection. Tosatisfy the requirements of energy metering and relay protection for the new generation of intelligent substation, based on the working principle of Rogowski coil current transformer, mathematical model and transfer characteristics of Rogowski coil sensors were studied in this paper, and frequency response characteristics of Rogowski coil current transformer system were analysed. Finally, the frequency response characteristics of the Rogowski coil current transformer at 2 to 13 harmonics was simulated and experimented. Simulation and experiments show that Rogowski coil current transformer couldmeet 0.2 accuracy requirements of harmonic power measurement of power system, and measure the harmonic components of the grid reliably.

  5. Magnetostatic calculation of fringing field for the Rogowski pole boundary with floating snake

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yan; Ming-Wu, Fan [Institute of Atomic Energy, Peking (China)

    1984-01-01

    A boundary integral method has been used to calculate the fringing field distribution of Rogowski pole boundary with floating snake for QMG2 type of QDDD magnetic spectrograph and the experimental EFB is nearly reproduced from BIM calculation. As a further criteria, a calculation for clamped Rogowski pole but without snake is also performed and the calculated EFB shows perfect identity with the experiment. For evaluating the effect of snake quantitatively, this work also predicts the EFB values for two different positions of snake.

  6. A magnetostatic calculation of fringing field for the Rogowski pole boundary with floating snake

    International Nuclear Information System (INIS)

    Yan Chen; Fan Ming-Wu

    1984-01-01

    A boundary integral method has been used to calculate the fringing field distribution of Rogowski pole boundary with floating snake for QMG2 type of QDDD magnetic spectrograph and the experimental EFB is nearly reproduced from BIM calculation. As a further criteria, a calculation for clamped Rogowski pole but without snake is also performed and the calculated EFB shows perfect identity with the experiment. For evaluating the effect of snake quantitatively, this work also predicts the EFB values for two different positions of snake

  7. Two high accuracy digital integrators for Rogowski current transducers

    Science.gov (United States)

    Luo, Pan-dian; Li, Hong-bin; Li, Zhen-hua

    2014-01-01

    The Rogowski current transducers have been widely used in AC current measurement, but their accuracy is mainly subject to the analog integrators, which have typical problems such as poor long-term stability and being susceptible to environmental conditions. The digital integrators can be another choice, but they cannot obtain a stable and accurate output for the reason that the DC component in original signal can be accumulated, which will lead to output DC drift. Unknown initial conditions can also result in integral output DC offset. This paper proposes two improved digital integrators used in Rogowski current transducers instead of traditional analog integrators for high measuring accuracy. A proportional-integral-derivative (PID) feedback controller and an attenuation coefficient have been applied in improving the Al-Alaoui integrator to change its DC response and get an ideal frequency response. For the special design in the field of digital signal processing, the improved digital integrators have better performance than analog integrators. Simulation models are built for the purpose of verification and comparison. The experiments prove that the designed integrators can achieve higher accuracy than analog integrators in steady-state response, transient-state response, and temperature changing condition.

  8. Diseño y construcción de bobinas de Rogowski modificadas de bajo costo y alto desempeño

    Directory of Open Access Journals (Sweden)

    Diego Seuret Jiménez

    2014-01-01

    Full Text Available Las bobinas Rogowski son dispositivos sencillos, confiables y versátiles para hacer mediciones de corriente en una amplia gama de aplicaciones que van, desde dispositivos microelectrónicos hasta sistemas de alta potencia en instalaciones industriales. Se construyó una bobina de Rogowski y el circuito de acondicionamiento de la señal para poder hacer mediciones de su respuesta ante estímulos eléctricos y llevar a cabo un análisis cualitativo. Adicionalmente, a partir del modelo matemático de la bobina, se hizo una modificación en la estructura interna de la misma para obtener voltajes de mayor magnitud y facilitar la lectura en instrumentos de medición eléctrica. Estos resultados se compararon con una bobina comercial estándar y las mediciones del voltaje de salida de la bobina Rogowski modificada muestran una señal con menos ruido y de mayor magnitud. Al haber aumentado la relación señal ruido en el sistema, el circuito de integración y amplificación arrojan resultados esperados.

  9. Research of Measurement Circuits for High Voltage Current Transformer Based on Rogowski Coils

    Directory of Open Access Journals (Sweden)

    Yan Bing

    2014-02-01

    Full Text Available The electronic current transformer plays an irreplaceable position in the field of relay protection and current measurement of the power system. Rogowski coils are used as sensor parts, and in order to improve the measurement accuracy and reliability, the circuits at the high voltage system are introduced and improved in this paper, including the analog integral element, the filtering circuit and the phase shift circuit. Simulations results proved the reliability and accuracy of the improved circuits.

  10. Prototyping and testing of the Continuous External Rogowski ITER magnetic sensor

    Energy Technology Data Exchange (ETDEWEB)

    Moreau, Ph., E-mail: philippe.jacques.moreau@cea.fr [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Le-Luyer, A.; Malard, P.; Pastor, P.; Saint-Laurent, F.; Spuig, P. [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Lister, J.; Toussaint, M.; Marmillod, P.; Testa, D. [Centre de Recherches en Physique des Plasmas, EPFL (Switzerland); Peruzzo, S. [Consorzio RFX, Association EURATOM-ENEA, C.so Stati Uniti 4, 35127 Padova (Italy); Knaster, J. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); IFMIF EVEDA, Rokkasho (Japan); Vayakis, G.; Hughes, S.; Patel, K.M. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: ► ITER Continuous External Rogowski (CER) are designed for plasma and vacuum vessel current measurement. ► CER are located in the casing of Toroidal Field Coils and thus will operate at 4 K. ► The design of the sensors has been completed. ► CER prototypes have been manufactured by 2 suppliers. ► The R and D campaign on CER prototypes consisted in the measurement of about 100 parameters to characterize the CER. -- Abstract: The measurement of the plasma current in ITER plays an outstanding role as it is part of the machine protection and is a safety-relevant measurement: it will be used in relation with regulatory limits to show that the operation remains within the safe envelope defined in the ITER license. The Continuous External Rogowski (CER) is an inductive sensor designed for current measurements and located in the casing of 3 Toroidal Field Coils (TFCs). After the completion of the design of the CER, 4 prototypes of the sensor were manufactured and R and D activities were performed under a Grant with the European Domestic Agency (F4E-GRT-012). The work was carried out between 2010 and 2011 by the ITERMAG consortium comprising 3 laboratories: CRPP (Switzerland) as leader, CEA (France) and RFX (Italy). The R and D campaign on CER prototypes consisted in the measurement of about 100 parameters to characterize the CER in terms of electrical, thermal, mechanical and also of vacuum compatibility. From these results, electromagnetic modeling of the CER response was performed. It is demonstrated that the CER fulfills ITER requirements. However, the vacuum compatibility of the prototype has to be improved and solutions to cope with this issue are proposed.

  11. Prototyping and testing of the Continuous External Rogowski ITER magnetic sensor

    International Nuclear Information System (INIS)

    Moreau, Ph.; Le-Luyer, A.; Malard, P.; Pastor, P.; Saint-Laurent, F.; Spuig, P.; Lister, J.; Toussaint, M.; Marmillod, P.; Testa, D.; Peruzzo, S.; Knaster, J.; Vayakis, G.; Hughes, S.; Patel, K.M.

    2013-01-01

    Highlights: ► ITER Continuous External Rogowski (CER) are designed for plasma and vacuum vessel current measurement. ► CER are located in the casing of Toroidal Field Coils and thus will operate at 4 K. ► The design of the sensors has been completed. ► CER prototypes have been manufactured by 2 suppliers. ► The R and D campaign on CER prototypes consisted in the measurement of about 100 parameters to characterize the CER. -- Abstract: The measurement of the plasma current in ITER plays an outstanding role as it is part of the machine protection and is a safety-relevant measurement: it will be used in relation with regulatory limits to show that the operation remains within the safe envelope defined in the ITER license. The Continuous External Rogowski (CER) is an inductive sensor designed for current measurements and located in the casing of 3 Toroidal Field Coils (TFCs). After the completion of the design of the CER, 4 prototypes of the sensor were manufactured and R and D activities were performed under a Grant with the European Domestic Agency (F4E-GRT-012). The work was carried out between 2010 and 2011 by the ITERMAG consortium comprising 3 laboratories: CRPP (Switzerland) as leader, CEA (France) and RFX (Italy). The R and D campaign on CER prototypes consisted in the measurement of about 100 parameters to characterize the CER in terms of electrical, thermal, mechanical and also of vacuum compatibility. From these results, electromagnetic modeling of the CER response was performed. It is demonstrated that the CER fulfills ITER requirements. However, the vacuum compatibility of the prototype has to be improved and solutions to cope with this issue are proposed

  12. Assembly, installation and commissioning of the new halo current sensors system for JET

    International Nuclear Information System (INIS)

    Peruzzo, S.; Fullard, K.; Grando, L.; Huntley, S.; Lam, N.; Pomaro, N.; Riccardo, V.; Sonato, P.

    2007-01-01

    This paper presents the status of the halo current sensors (HCS) diagnostic enhancement project for JET. The HCS system includes four sets of probes located in four octants equally spaced along the toroidal coordinate, with a total of 24 Rogowski coils and 5 toroidal field pick-up coils. These sensors are meant to provide a measurement of the current flowing through each single tile of the upper dump plate and an estimate of the total poloidal halo current flowing through the first wall structures. The HCS system was installed in the JET vacuum vessel in March 2005 during the 2004/2005 shutdown and the acquisition of signals started during the restart phase of the machine in autumn 2005. This paper firstly summarises the critical aspects encountered during the final phase of the procurement of the system and the in-vessel installation, which was accomplished using the remote handling system. The paper then focuses on the analysis and interpretation of the data collected during the functional commissioning of the new system, carried out during the restart phase of the machine preceding the experimental campaigns

  13. Plasma column displacement measurements by modified Rogowski sine-coil and Biot-Savart/magnetic flux equation solution on IR-T1 tokamak

    International Nuclear Information System (INIS)

    Razavi, M.; Mollai, M.; Khorshid, P.; Nedzelskiy, I.; Ghoranneviss, M.

    2010-01-01

    The modified Rogowski sine-coil (MRSC) has been designed and implemented for the plasma column horizontal displacement measurements on small IR-T1 tokamak. MRSC operation has been examined on test assembly and tokamak. Obtained results show high sensitivity to the plasma column horizontal displacement and negligible sensitivity to the vertical displacement; linearity in wide, ±0.1 m, range of the displacements; and excellent, 1.5%, agreement with the results of numerical solution of Biot-Savart and magnetic flux equations.

  14. Assembly, installation and commissioning of the JET-EP Halo Current Sensors system

    International Nuclear Information System (INIS)

    Peruzzo, S.; Grando, L.; Pomaro, N.; Sonato, P.; Fullard, K.; Huntley, S.; Lam, N.; Riccardo, V.

    2006-01-01

    The Halo Current Sensors (HCS) system has been developed under the JET-EP enhancement programme, to allow a more detailed study of the Halo Currents flowing in the upper part of the JET vessel. A better understanding of the origin, distribution and scaling of Halo Currents in tokamaks is one of the critical issues for any next step device, like the ITER project, in particular for the design of the plasma facing components and for a reliable plasma operation at high performances. The HCS system includes four sets of probes located in four octants equally spaced along the toroidal coordinate, each containing up to eight Rogowski coils and two toroidal field pick-up coils. The Rogowski coils are designed to directly measure the current flowing through the tiles of the upper dump plate, whereas the toroidal field pick-up coils are conceived to give an estimate the total poloidal Halo Current flowing through the first wall structures. The HCS system was installed in the JET vacuum vessel in March 2005 during the 2004/05 Shutdown and started the acquisition of signals during the restart phase of the machine in autumn 2005. This paper will highlight and discuss the critical aspects and the lessons learned during the final phase of the procurement of the system; the in-vessel installation, accomplished by means of remote handling system, and the pre-commissioning tests executed on the system will be described in detail. The paper will then focus on the analysis and interpretation of the data collected during the functional commissioning of the new system, carried out during the restart phase of the machine preceding the experimental campaigns. Since the beginning of operation the HCS signals showed the effects of several noise sources, increased by the low sensitivity of the probes, due to design geometrical constraints. The expected pick-up of stray magnetic fields was quite easily compensated through a correlation with other existing magnetic diagnostics. Moreover the

  15. Research on the Factors Influencing the Measurement Errors of the Discrete Rogowski Coil.

    Science.gov (United States)

    Xu, Mengyuan; Yan, Jing; Geng, Yingsan; Zhang, Kun; Sun, Chao

    2018-03-13

    An innovative array of magnetic coils (the discrete Rogowski coil-RC) with the advantages of flexible structure, miniaturization and mass producibility is investigated. First, the mutual inductance between the discrete RC and circular and rectangular conductors are calculated using the magnetic vector potential (MVP) method. The results are found to be consistent with those calculated using the finite element method, but the MVP method is simpler and more practical. Then, the influence of conductor section parameters, inclination, and eccentricity on the accuracy of the discrete RC is calculated to provide a reference. Studying the influence of an external current on the discrete RC's interference error reveals optimal values for length, winding density, and position arrangement of the solenoids. It has also found that eccentricity and interference errors decreasing with increasing number of solenoids. Finally, a discrete RC prototype is devised and manufactured. The experimental results show consistent output characteristics, with the calculated sensitivity and mutual inductance of the discrete RC being very close to the experimental results. The influence of an external conductor on the measurement of the discrete RC is analyzed experimentally, and the results show that interference from an external current decreases with increasing distance between the external and measured conductors.

  16. Research on the Factors Influencing the Measurement Errors of the Discrete Rogowski Coil

    Directory of Open Access Journals (Sweden)

    Mengyuan Xu

    2018-03-01

    Full Text Available An innovative array of magnetic coils (the discrete Rogowski coil—RC with the advantages of flexible structure, miniaturization and mass producibility is investigated. First, the mutual inductance between the discrete RC and circular and rectangular conductors are calculated using the magnetic vector potential (MVP method. The results are found to be consistent with those calculated using the finite element method, but the MVP method is simpler and more practical. Then, the influence of conductor section parameters, inclination, and eccentricity on the accuracy of the discrete RC is calculated to provide a reference. Studying the influence of an external current on the discrete RC’s interference error reveals optimal values for length, winding density, and position arrangement of the solenoids. It has also found that eccentricity and interference errors decreasing with increasing number of solenoids. Finally, a discrete RC prototype is devised and manufactured. The experimental results show consistent output characteristics, with the calculated sensitivity and mutual inductance of the discrete RC being very close to the experimental results. The influence of an external conductor on the measurement of the discrete RC is analyzed experimentally, and the results show that interference from an external current decreases with increasing distance between the external and measured conductors.

  17. Research on the Factors Influencing the Measurement Errors of the Discrete Rogowski Coil †

    Science.gov (United States)

    Xu, Mengyuan; Yan, Jing; Geng, Yingsan; Zhang, Kun; Sun, Chao

    2018-01-01

    An innovative array of magnetic coils (the discrete Rogowski coil—RC) with the advantages of flexible structure, miniaturization and mass producibility is investigated. First, the mutual inductance between the discrete RC and circular and rectangular conductors are calculated using the magnetic vector potential (MVP) method. The results are found to be consistent with those calculated using the finite element method, but the MVP method is simpler and more practical. Then, the influence of conductor section parameters, inclination, and eccentricity on the accuracy of the discrete RC is calculated to provide a reference. Studying the influence of an external current on the discrete RC’s interference error reveals optimal values for length, winding density, and position arrangement of the solenoids. It has also found that eccentricity and interference errors decreasing with increasing number of solenoids. Finally, a discrete RC prototype is devised and manufactured. The experimental results show consistent output characteristics, with the calculated sensitivity and mutual inductance of the discrete RC being very close to the experimental results. The influence of an external conductor on the measurement of the discrete RC is analyzed experimentally, and the results show that interference from an external current decreases with increasing distance between the external and measured conductors. PMID:29534006

  18. Current distribution between petals in PF-FSJS sample

    International Nuclear Information System (INIS)

    Zani, L.

    2003-01-01

    6 Rogowski coils have been installed on each leg of each of the 12 petals in the PF-FSJS sample (poloidal field - full size joint sample) in order to diagnostic current. It appears that Rogowski signal seem reliable for current distribution analysis (Ampere's law is checked and reproducibility is assured) but there is some limitations for qualitative diagnostics. In the series of transparencies results are detailed for the PU1 position, for both leg and right legs and for various unique-angle shift (Δθ) configurations but only results for 0 < Δθ < -5 are consistent

  19. Determination of plasma spot current and arc discharge plasma current on the system of plasma cathode electron sources using Rogowski coil technique

    International Nuclear Information System (INIS)

    Wirjoadi; Bambang Siswanto; Lely Susita RM; Agus Purwadi; Sudjatmoko

    2015-01-01

    It has been done the function test experiments of ignitor electrode system and the plasma generator electrode system to determine the current spot plasma and arc discharge plasma current with Rogowski coil technique. Ignitor electrode system that gets power supply from IDPS system can generate the plasma spot current of 11.68 ampere to the pulse width of about 33 μs, this value is greater than the design probably because of electronic components used in the IDPS system was not as planned. For the plasma generator electrode system that gets power from ADPS system capable of producing an arc discharge plasma current around 103.15 amperes with a pulse width of about 96 μs, and this value as planned. Based on the value of the arc discharge plasma current can be determined plasma electron density, which is about 10.12 10"1"9 electrons/m"3, and with this electron density value, an ignitor electrode system and a plasma generator system is quite good if used as a plasma cathode electron source system. (author)

  20. Automatic electromagnetic valve for previous vacuum

    International Nuclear Information System (INIS)

    Granados, C. E.; Martin, F.

    1959-01-01

    A valve which permits the maintenance of an installation vacuum when electric current fails is described. It also lets the air in the previous vacuum bomb to prevent the oil ascending in the vacuum tubes. (Author)

  1. Characterization of light ion beams generated by a plasma focus device

    International Nuclear Information System (INIS)

    Koo, Bon Cheul

    1999-02-01

    Plasma focus device has been studied as neutron and X-ray sources generated from the high pressure fusion reaction during Z-pinch. Recently, the scope of the device is focused on efficient neutron generation, X-ray lithography, preliminary fusion experiment, and ion/electron beam generation devices. A Hexagonal Beam Generator with six parallel capacitors has been developed and generated ion beams from 30kJ(C=6 μ F, V= 100kV) maximum energy. To find the optimum condition of ion beam generation, the correlation among charging voltage(20∼30kV), operation pressure of chamber(0.1∼5 torr), and length of electrode has been studied. To measure ion beam, a Faraday Cup and 3 Rogowski coils were installed. Energy of ion beam was obtained by adopting time-of -flight method between Rogowski coils

  2. Magnetic diagnostics at Wendelstein 7-X

    Energy Technology Data Exchange (ETDEWEB)

    Rahbarnia, K.; Andreeva, T.; Endler, M.; Hathiramani, D.; Grulke, O.; Neuner, U.; Svensson, J.; Thomsen, H.; Geiger, J.; Werner, A. [Max Planck Institute for Plasma Physics, Greifswald (Germany); Cardella, A. [JT-60SA project, F4E c/o IPP, Garching (Germany); Carvalho, B. [Instituto de Plasmas e Fusao Nuclear Instituto Superior Tecnico, Lisbon (Portugal)

    2016-07-01

    An arrangement of magnetic sensors has been installed at the stellarator Wendelstein 7-X (W7-X) including over 300 individual 3D shaped sensors like diamagnetic loops, Rogowski, Saddle and Mirnov coils. Future long pulse operation of up to 1800 s demands an optimization of materials, thermal shielding and signal integration accuracy. The main objectives are the reconstruction of magnetic equilibria and monitoring the diamagnetic plasma energy. Generally, in stellarators a toroidal current drive is not necessary to maintain confinement. Minimization of toroidal currents is in fact one of the major optimization criteria of W7-X. It will be investigated by continuous and segmented Rogowski coils and Saddle coils measuring e.g. bootstrap and Pfirsch-Schlueter currents and their spatial distributions. A set of 125 toroidally and poloidally arranged Mirnov coils will give information on MHD and Alfven mode activity and edge localized modes (ELMs). A detailed overview of the magnetic diagnostic system is outlined, and initial results obtained during the first operation phase of W7-X are presented.

  3. Installing the ALICE detector

    CERN Multimedia

    Maximilien Brice

    2006-01-01

    The huge iron yoke in the cavern at Point 2 in the LHC tunnel is prepared for the installation of the ALICE experiment. The yoke is being reused from the previous L3 experiment that was located at the same point during the LEP project from 1989 to 2000. ALICE will be inserted piece by piece into the cradle where it will be used to study collisions between two beams of lead ions.

  4. Safety of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    In accordance with the Nuclear Energy Act, a Licence may only be issued if the precautions required by the state of the art have been taken to prevent damage resulting from the construction and operation of the installation. The maximum admissible body doses in the area around the installation which must be observed in planning constructional and other technical protective measures to counter accidents in or at a nuclear power station (accident planning values, are established). According to the Radiological Protection Ordinance the Licensing Authority can consider these precautions to have been taken if, in designing the installation against accidents, the applicant has assumed the accidents which, according to the Safety Criteria and Guidelines for Nuclear Power Stations published in the Federal Register by the Federal Minister of the Interior after hearing the competent senior state authorities, must determine the design of a nuclear power station. On the basis of previous experience from safety analysis, assessment and operation of nuclear power stations, the accident guidelines published here define which accidents are determinative for the safety-related design of PWR power stations and what verification -particularly with regard to compliance with the accident planning values of the Radiological Protection Ordinance -must be provided by the applicant. (author)

  5. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  6. SNRIU nuclear installation modifications

    International Nuclear Information System (INIS)

    Goroshanskyi, Andrii

    2013-01-01

    Design stages of Nuclear Instalations (NI): NI design is performed in three stages: • Feasibility study: - Feasibility study is developed on the basis of the customer task for production facilities and linear facilities engineering and transport infrastructure that require detailed study of relevant decisions and identify options for and feasibility of construction. • Design: - The design is developed on the basis of design task, initial data and approved the previous stage under three-stage design. • Detailed documentation

  7. Installation of the LHC transfer lines begins

    CERN Multimedia

    2003-01-01

    On 19 February, the very first magnet was installed in one of the two tunnels that will house the transfer lines leading to the LHC. This magnet, recycled from a previous facility, was transported and positioned using a novel system designed for conveying large objects through narrow tunnels.

  8. A dynamic system for ATLAS software installation on OSG grid sites

    International Nuclear Information System (INIS)

    Zhao, X; Maeno, T; Wenaus, T; Leuhring, F; Youssef, S; Brunelle, J; De Salvo, A; Thompson, A S

    2010-01-01

    A dynamic and reliable system for installing the ATLAS software releases on Grid sites is crucial to guarantee the timely and smooth start of ATLAS production and reduce its failure rate. In this paper, we discuss the issues encountered in the previous software installation system, and introduce the new approach, which is built upon the new development in the areas of the ATLAS workload management system (PanDA), and software package management system (pacman). It is also designed to integrate with the EGEE ATLAS software installation framework. In the new system, ATLAS software releases are packaged as pacball, a uniquely identifiable and reproducible self-installing data file. The distribution of pacballs to remote sites is managed by ATLAS data management system (DQ2) and PanDA server. The installation on remote sites is automatically triggered by the PanDA pilot jobs. The installation job payload connects to a central ATLAS software installation portal, making the information of installation status easily accessible across OSG and EGEE Grids. The issues encountered in running the new system in production, and our future plan for improvement, will also be discussed.

  9. Development of magnetic sensors for JT-60SA

    Energy Technology Data Exchange (ETDEWEB)

    Takechi, M., E-mail: takechi.manabu@jaea.go.jp [Japan Atomic Energy Agency, Naka, Ibaraki 311-0193 (Japan); Matsunaga, G.; Sakurai, S.; Sasajima, T.; Yagyu, J.; Hoshi, R.; Kawamata, Y.; Kurihara, K. [Japan Atomic Energy Agency, Naka, Ibaraki 311-0193 (Japan); Nishikawa, T.; Ryo, T.; Kagamihara, S. [Okazaki Manufacturing Company, Kobe, Hyogo 651-0087 (Japan); Nakamura, K. [RIAM, Kyushu Univ., Kasuga, Fukuoka 816-8580,Japan (Japan)

    2015-10-15

    JT-60SA has been designed and is being constructed to demonstrate and develop steady-state high-beta operation. Resistive wall mode (RWM) control, error field correction, and edge-localized mode (ELM) control will be performed using in-vessel coils. For these controls, we have developed a biaxial magnetic sensor to determine 3D magnetic configuration of the plasma. Moreover, for obtaining basic information about JT-60SA plasma, magnetic sensors, in particular, one-turn loops, Rogowski coils, diamagnetic loops, and saddle coils have been developed. Because the length of the vacuum vessel in the poloidal direction of JT-60SA is 16 m and almost twice as long as that of JT-60U, the length of the Rogowski coil and the diamagnetic loop of JT-60SA are also twice as long as those on JT-60U. We have devised new types of sensors and a connector for the mineral-insulated cable because construction and installation of these sensors are much more difficult in JT-60SA. We will report the design and specification of the magnetic sensors for JT-60SA from the physics and engineering aspects.

  10. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  11. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  12. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  13. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  14. Summary of QRL 7-8 Repair and Re-installation Leak Test Results

    CERN Document Server

    Kos, N; CERN. Geneva. TE Department

    2009-01-01

    This note describes the leak tests that have been performed during the repair and re-installation of QRL sector 7-8 during 2005 and 2006. The leak tests were performed in UX65, where the pipe elements were refurbished before re-installation, and in the tunnel. A variety of leaks have been detected, localised and repaired in the tunnel, including weld defects, accidentally drilled holes and imported leaks in previously tested components.

  15. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  16. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  17. Second update of the database of photovoltaic installations in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D; Bruhns, H

    2001-07-01

    This update of the database of photovoltaic (PV) installations in the UK developed by Altechnica for the Department of Trade and Industry has double the number of records of the previous edition, and focuses on the use of photovoltaic (PV) installations for buildings, for example using some form of a PV array, building integrated PV module, and building attached PV array. The growth in building related PV installations is examined along with the use of PV in telecommunication equipment, navigation buoys and light vessels, buildings, pumps for solar water heating systems, schools, lighthouses, and petrol stations. Details are given of the electronic data entry form for the database and the increase in the number of fields to allow additional information such as tilt angle and orientation area of the array to be added.

  18. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  19. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  20. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  1. A precision analogue integrator system for heavy current measurement in MFDC resistance spot welding

    International Nuclear Information System (INIS)

    Xia, Yu-Jun; Zhang, Zhong-Dian; Xia, Zhen-Xin; Zhu, Shi-Liang; Zhang, Rui

    2016-01-01

    In order to control and monitor the quality of middle frequency direct current (MFDC) resistance spot welding (RSW), precision measurement of the welding current up to 100 kA is required, for which Rogowski coils are the only viable current transducers at present. Thus, a highly accurate analogue integrator is the key to restoring the converted signals collected from the Rogowski coils. Previous studies emphasised that the integration drift is a major factor that influences the performance of analogue integrators, but capacitive leakage error also has a significant impact on the result, especially in long-time pulse integration. In this article, new methods of measuring and compensating capacitive leakage error are proposed to fabricate a precision analogue integrator system for MFDC RSW. A voltage holding test is carried out to measure the integration error caused by capacitive leakage, and an original integrator with a feedback adder is designed to compensate capacitive leakage error in real time. The experimental results and statistical analysis show that the new analogue integrator system could constrain both drift and capacitive leakage error, of which the effect is robust to different voltage levels of output signals. The total integration error is limited within  ±0.09 mV s −1 0.005% s −1 or full scale at a 95% confidence level, which makes it possible to achieve the precision measurement of the welding current of MFDC RSW with Rogowski coils of 0.1% accuracy class. (paper)

  2. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  3. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  4. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  5. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  6. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  7. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  8. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  9. Seismic Hazards in Site Evaluation for Nuclear Installations. Specific Safety Guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-08-15

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear installations. It supplements the Safety Requirements publication on Site Evaluation for Nuclear Installations. The present publication provides guidance and recommends procedures for the evaluation of seismic hazards for nuclear power plants and other nuclear installations. It supersedes Evaluation of Seismic Hazards for Nuclear Power Plants, IAEA Safety Standards Series No. NS-G-3.3 (2002). In this publication, the following was taken into account: the need for seismic hazard curves and ground motion spectra for the probabilistic safety assessment of external events for new and existing nuclear installations; feedback of information from IAEA reviews of seismic safety studies for nuclear installations performed over the previous decade; collective knowledge gained from recent significant earthquakes; and new approaches in methods of analysis, particularly in the areas of probabilistic seismic hazard analysis and strong motion simulation. In the evaluation of a site for a nuclear installation, engineering solutions will generally be available to mitigate, by means of certain design features, the potential vibratory effects of earthquakes. However, such solutions cannot always be demonstrated to be adequate for mitigating the effects of phenomena of significant permanent ground displacement such as surface faulting, subsidence, ground collapse or fault creep. The objective of this Safety Guide is to provide recommendations and guidance on evaluating seismic hazards at a nuclear installation site and, in particular, on how to determine: (a) the vibratory ground motion hazards, in order to establish the design basis ground motions and other relevant parameters for both new and existing nuclear installations; and (b) the potential for fault displacement and the rate of fault displacement that could affect the feasibility of the site or the safe operation of the installation at

  10. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  11. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  12. Equilibrium and stability of the Los Alamos spheromak

    International Nuclear Information System (INIS)

    Marklin, G.

    1984-01-01

    The open mesh flux conserver (MFC) on the Los Alamos spheromak (CTX) has been equipped with a large number of Rogowski loops measuring the current in the individual segments of the MFC, providing a complete picture of the surface current pattern induced by the equilibrium and oscillations of the confined plasma. An analysis was made of the data from these Rogowski loops

  13. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Hayoun, C [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  14. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  15. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  16. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  17. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  18. Velocity diagnostics of electron beams within a 140 GHz gyrotron

    International Nuclear Information System (INIS)

    Polevoy, J.T.

    1989-06-01

    Experimental measurements of the average axial velocity v parallel of the electron beam within the M.I.T. 140 GHz MW gyrotron have been performed. The method involves the simultaneous measurement of the radial electrostatic potential of the electron beam V p and the beam current I b . V p is measured through the use of a capacitive probe installed near or within the gyrotron cavity, while I b is measured with a previously installed Rogowski coil. Three capacitive probes have been designed and built, and two have operated within the gyrotron. The probe results are repeatable and consistent with theory. The measurements of v parallel and calculations of the corresponding transverse to longitudinal beam velocity ratio α = v perpendicular /v parallel at the cavity have been made at various gyrotron operation parameters. These measurements will provide insight into the causes of discrepancies between theoretical rf interaction efficiencies and experimental efficiencies obtained in experiments with the M.I.T. 140 GHz MW gyrotron. The expected values of v parallel and α are determined through the use of a computer code entitled EGUN. EGUN is used to model the cathode and anode regions of the gyrotron and it computes the trajectories and velocities of the electrons within the gyrotron. There is good correlation between the expected and measured values of α at low α, with the expected values from EGUN often falling within the standard errors of the measured values. 10 refs., 29 figs., 2 tabs

  19. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  20. Design of electron detection system for pulse electron irradiator

    International Nuclear Information System (INIS)

    Anjar Anggraini H; Agus Purwadi; Lely Susita RM; Bambang Siswanto; Agus Wijayanto

    2016-01-01

    Design of electron detection system for pulse electron irradiator has been conducted on the Plasma Cathode Electron Source by Rogowski coil technique. Rogowski coil has ability to capture the induced magnetic field of the electric current, subsequent induced magnetic field will provide voltage after passing integrator. This diagnostic used combination of copper wire, ferrite and RC integrator. The design depends on the pulse width and the value of plasma current that passes through the coil, thus the number of windings, coil area and integrator can be designed. For plasma spots current of IDPS expected to be 10 A and pulse width 10 μs the Rogowski coil using MnZn ferrite with inductance L = 0.275 mH and permeability μr = 200 H/m. For the current of plasma arc ADPS expected to be 100 A and pulse width 100 μs by using inductance L=1.9634 mH and permeability μr = 6256 H/m. Electron current in extraction system expected to be 30 A and pulse width 100 μs the Rogowski coil using inductance L=51.749 mH and permeability μr= 4987 H/m. Design integrator used is the type of RC integrator. (author)

  1. Installation, testing and first results of TEXTOR's new ICRH system

    International Nuclear Information System (INIS)

    Durodie, F.; Delvigne, T.; Descamps, P.; Koch, R.; Ongena, J.; Vandenplas, P.E.; Van Nieuwenhove, R.; Van Oost, G.; Weynants, R.R.; Shen, X.M.; Ecole Royale Militaire, Brussels; Messiaen, A.M.; Ecole Royale Militaire, Brussels; Huetteman, P.; Kohlhaas, W.; Stickelman, C.; Cosler, A.

    1989-01-01

    The new ICRH system for TEXTOR, presented at the previous SOFT conference, has been tested and installed during spring and summer of 1987. Pulses of up to 2.8 MW have been achieved representing a power density at the antenna of about 3.1 MW/m 2 and over 90% of the installed RF power. Taking into account the already achieved volttages in the system one could extrapolate that a power density of 10 MW/m 2 with an transmission efficiency well over 90% would be technically feasible. First results, such as the interesting property that, in contrast with other experiments, the two antennae in each pair operate with zero and with π phase difference with nearly the same coupling efficiency, are discussed. The testing and conditioning procedures are described. RF-leak problems encounterd at the behinning of the experimental phase are discussed. Antenna and transmission line diagnostics as well as related tuning procedures are also described. During the installation of the neutral beam injectors, from beginning of April to about end of August 1988, several modifications to the whole of the ICRH system are being implemented. (author). 5 refs.; 6 figs.; 1 tab

  2. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  3. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  4. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  5. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  6. Act no 76-663 of 19 July 1976 on installations classified for the purposes of environmental protection

    International Nuclear Information System (INIS)

    1976-01-01

    This Act repeals the Act of 19 December 1917 on dangerous, noxious or insanitary establishments. Installations of all kinds, operated or owned by any person, whether natural or legal, public or private, are from now onwards governed by the provisions of the Act of 19 July 1976 if they may involve dangers or disadvantages for the amenities of the neighbour-hood, for public health, safety or hygiene, for agriculture, for the protection of nature and the environment, or for the preservation of sites and monuments. As was the case with the previous system, it is foreseen that large nuclear installations which have their own regulations and are defined in the Decree of 11 December 1963 will not appear in the nomenclature and will remain outside application of the legislation on classified installations. However, some nuclear installations are not large nuclear installations and a number of these were listed in the nomenclature of classified establishments drawn up under the 1917 Act. (NEA) [fr

  7. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  8. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  9. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  10. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  11. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  12. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  13. HTS Transmission Cable System for installation in the Long Island Power Grid

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Frank [American Superconductor Corporation, Devens, MA (United States); Durand, Fabien [American Superconductor Corporation, Devens, MA (United States); Maguire, James [American Superconductor Corporation, Devens, MA (United States)

    2015-10-05

    Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2 and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.

  14. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  15. 46 CFR 111.60-5 - Cable installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  16. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  17. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  18. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  19. A General Purpose High Performance Linux Installation Infrastructure

    International Nuclear Information System (INIS)

    Wachsmann, Alf

    2002-01-01

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation

  20. Development of an improved installation procedure and schedule of RVI modularization for APR1400

    International Nuclear Information System (INIS)

    Ko, Do Young

    2011-01-01

    The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule

  1. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    There is a great politically will to expand the green energy market in these times. A proven green technology is wind turbines. Wind turbines have been installed in great numbers on land over the last decades. However, the current development in wind turbine design leads to larger turbine sizes...... in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...

  2. CHARGED PARTICLE MOTION IN AN EXPLOSIVELY GENERATED IONIZING SHOCK

    International Nuclear Information System (INIS)

    Boswell, Christopher J.; O'Connor, Patrick D.

    2009-01-01

    Different aspects of the plasma generated in a gas contained in a tube due to detonation of a small explosive charge located at one end of the tube are presented. The motion of the charged particles within the plasma is monitored using Rogowski coils. Using time-resolved emission spectroscopy the temperature and species in the detonation products and compressed gas behind the shock wave are recorded. From the spectral lines of the emission profiles the temperatures and electron density were evaluated to be in the vicinity of 7,000 K and 5x10 22 m -3 . An ultra fast wave traveling down the guide tube ahead of the hydrodynamic shock and causing any charged particles there to move fast enough to be detected by the Rogowski coils was recorded. From the measurements the phase velocity of the wave was calculated at 525 km/s when krypton filled the tube, and 1300 km/s in the case of argon. The temperature and density measurements are consistent with the data reported in the literature for similar tests. The electrostatic pulse measurements are a new phenomena not previously observed.

  3. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  4. Does drywall installers' innovative idea reduce the ergonomic exposures of ceiling installation: A field case study.

    Science.gov (United States)

    Dasgupta, Priyadarshini Sengupta; Punnett, Laura; Moir, Susan; Kuhn, Sarah; Buchholz, Bryan

    2016-07-01

    The study was conducted to assess an intervention suggested by the workers to reduce the physical or ergonomic exposures of the drywall installation task. The drywall installers were asked to brainstorm on innovative ideas that could reduce their ergonomic exposures during the drywall installation work. The workers proposed the idea of using a 'deadman' (narrow panel piece) to hold the panels to the ceiling while installing them. The researcher collected quantitative exposure data (PATH, 3DSSPP) at the baseline and intervention phases and compared the phases to find out any change in the exposure while using the 'deadman'. Results showed that ergonomic exposures (such as overhead arm and awkward trunk postures and heavy load handling) were reduced at the intervention phase while using the 'deadman' with an electrically operated lift. The concept of the 'deadman', which was shown to help reduce musculoskeletal exposures during ceiling installation, can be used to fabricate a permanent ergonomic tool to support the ceiling drywall panel. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  5. Installations solaires photovoltaïques

    CERN Document Server

    2014-01-01

    Cet ouvrage présente les règles de conception et de mise en œuvre des installations photovoltaïques raccordées au réseau public de distribution à basse tension. Il s’applique aux bâtiments neufs et existants et concerne non seulement les petites installations résidentielles, d’une puissance de l’ordre de quelques kWc, mais aussi celles des bâtiments collectifs, tertiaires ou agricoles. Il traite successivement : - des fondamentaux de l'énergie solaire photovoltaïque (gisement solaire, principe de la conversion, composants d'une installation...) ; - du dimensionnement de l'installation (choix des matériels, règles de conception, estimation de l'énergie récupérable...) ; - de sa mise en oeuvre (travail en hauteur, habilitation électrique, mise en service, maintenance...) ; - des démarches administratives nécessaires (aides financières, accès au réseau de distribution, vente de l'électricité produite...).

  6. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  7. Topics on Japanese aseismic design for nuclear installations

    International Nuclear Information System (INIS)

    Nakamura, Masahiko

    2002-01-01

    Major items of of Japanese anti-seismic design for nuclear installations involve three topics: earthquakes and ground motion; seismic design and safety evaluation. The first topic deal with: improvement of geological survey technology, evaluation of ground motion from active faults, and characterisation of earthquake from individual faults. Seismic design involves: evaluation of design ground motion (spectra), classification of structures, systems and components (SSCs) based on the seismic importance, and seismic design criteria and critical loads. Safety evaluation of seismic PSA is dependent on the consistency of the the two previous items. Seismic hazard evaluation methodology, database and examples of analysis are described. Analysis method using fault model is included

  8. Wideband Precision Current Transformer for the Magnet Current of the Beam Extraction Kicker Magnet of the Large Hadron Collider

    CERN Document Server

    Gräwer, G

    2004-01-01

    The LHC beam extraction system is composed of 15 fast kicker magnets per beam to extract the particles in one turn of the collider and to safely dispose them on external absorbers. Each magnet is powered by a separate pulse generator. The generator produces a magnet current pulse with 3 us rise time, 20 kA amplitude and 1.8 ms fall time, of which 90 us are needed to dump the beam. The beam extraction system requires a high level of reliability. To detect any change in the magnet current characteristics, which might indicate a slow degradation of the pulse generator, a high precision wideband current transformer will be installed. For redundancy reasons, the results obtained with this device will be cross-checked with a Rogowski coil, installed adjacent to the transformer. A prototype transformer has been successfully tested at nominal current levels and showed satisfactory results compared with the output of a high frequency resistive coaxial shunt. The annular core of the ring type transformer is composed of...

  9. 46 CFR 58.10-5 - Gasoline engine installations.

    Science.gov (United States)

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... of such protection. (d) Exhaust pipe. (1) Exhaust pipe installations must conform to the requirements...

  10. Installation for analytic chemistry under irradiation; Installation de chimie analytique sous rayonnement

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Azoeuf, P; Guillon, A [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1966-07-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [French] L'installation a ete realisee pour effectuer des manipulations et des analyses chimiques sur des produits radioactifs. Elle est totalement telecommandee et se presente sous une forme lineaire de 15 metres de longueur et comporte trois zones: - une zone active d'appareillage, - une zone arriere d'intervention, - une zone avant independante des deux premieres et totalement protegee, ou s'operent les telecommandes de l'appareillage. L'ensemble a ete concu de facon a ce que chaque appareillage correspondant a une technique d'analyse soit implante dans une enceinte etanche. Les enceintes etanches sont reliees entre elles par un convoyeur. Apres trois annees de fonctionnement nous faisons le bilan et les critiques de l'installation. (auteurs)

  11. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  12. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  13. Velocity diagnostics of electron beams within a 140 GHz gyrotron

    Science.gov (United States)

    Polevoy, Jeffrey Todd

    1989-06-01

    Experimental measurements of the average axial velocity v(sub parallel) of the electron beam within the M.I.T. 140 GHz MW gyrotron have been performed. The method involves the simultaneous measurement of the radial electrostatic potential of the electron beam V(sub p) and the beam current I(sub b). The V(sub p) is measured through the use of a capacitive probe installed near or within the gyrotron cavity, while I(sub b) is measured with a previously installed Rogowski coil. Three capacitive probes have been designed and built, and two have operated within the gyrotron. The probe results are repeatable and consistent with theory. The measurements of v(sub parallel) and calculations of the corresponding transverse to longitudinal beam velocity ratio (alpha) = v(sub perpendicular)/v(sub parallel) at the cavity have been made at various gyrotron operation parameters. These measurements will provide insight into the causes of discrepancies between theoretical RF interaction efficiencies and experimental efficiencies obtained in experiments with the M.I.T. 140 GHz MW gyrotron. The expected values of v(sub parallel) and (alpha) are determined through the use of a computer code (EGUN) which is used to model the cathode and anode regions of the gyrotron. It also computes the trajectories and velocities of the electrons within the gyrotron. There is good correlation between the expected and measured values of (alpha) at low (alpha), with the expected values from EGUN often falling within the standard errors of the measured values.

  14. Competent person for radiation protection. Practical radiation protection for base nuclear installations and installations classified for the environment protection

    International Nuclear Information System (INIS)

    Pin, A.; Perez, S.; Videcoq, J.; Ammerich, M.

    2008-01-01

    This book corresponds to the practical module devoted to the base nuclear installations and to the installations classified for the environment protection, that is to say the permanent nuclear installations susceptible to present risks for the public, environment or workers. Complied with the legislation that stipulates this module must allow to apply the acquired theoretical training to practical situations of work, it includes seven chapters as follow: generalities on access conditions in regulated areas of nuclear installation,s or installations classified for environment protection and clothing against contamination; use of control devices and management of damaged situations; methodology of working place studies, completed by the application to a real case of a study on an intervention on a containment wall; a part entitled 'take stock of the situation' ends every chapter and proposes to the reader to check its understanding and acquisition of treated knowledge. (N.C.)

  15. 24 CFR 3280.709 - Installation of appliances.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Installation of appliances. 3280... Fuel Burning Systems § 3280.709 Installation of appliances. (a) The installation of each appliance... the manufacturer's instructions attached to the appliance. Every appliance shall be secured in place...

  16. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  17. The Dismantling of Nuclear Installations in France

    International Nuclear Information System (INIS)

    Bonnaure, P.

    2011-01-01

    As we saw in the previous article by Pierre Bonnaure, though it has long been decried for the dangers inherent in its production structures and the very long-lived waste that it generates, nuclear power may yet recover its credibility, particularly in France. However, on close examination, we see that the nuclear industry is beset by a number of unresolved questions, beginning with the dismantling of installations that have become obsolete or are set to become so. Nuclear power took off after the Second World War, but several generations of technology have been developed since then, and most currently functioning power-stations - mainly second-generation installations - are theoretically nearing the end of their useful lives, at least in terms of what was said when they were being built. The problem therefore arises of their dismantling and the clean-up of the sites on which they were built, a thorny question on which Pierre Bonnaure casts light in this article (prospects, strategies, financing, management of waste etc.). Unfortunately, it emerges that in France nothing has really been resolved, that public debate on the matter is decidedly limited and that investment (both financial investment and research) is not commensurate with the needs of a sector which is, after all, the source of three quarters of national electricity production. (author)

  18. Successful pipeline installation for Parque das Conchas development; Subsea installation

    Energy Technology Data Exchange (ETDEWEB)

    Bartz, Cesar

    2010-07-01

    Subsea 7 has successfully delivered again in Brazilian deep-waters. The subsea engineering and construction company has recently completed pipeline installation activities for the Parque das Conchas (BC-10) development, offshore Brazil. (AG)

  19. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  20. 46 CFR 181.520 - Installation and location.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer in...

  1. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  2. Location of Swedish wind power—Random or not? A quantitative analysis of differences in installed wind power capacity across Swedish municipalities

    International Nuclear Information System (INIS)

    Ek, Kristina; Persson, Lars; Johansson, Maria; Waldo, Åsa

    2013-01-01

    The amount of installed wind power varies significantly across municipalities although the financial support for wind power production and the technology available is identical in all Swedish municipalities. This study analyses how local differences between municipalities, such as local wind prerequisites and socioeconomic conditions, might explain the establishment of wind power. The analysis is carried out for a cross section of Swedish municipalities. The time periods before and after 2006 are analyzed separately; and results reveal that the factors affecting wind power establishments are different between the two periods. In the later time period we found a statistically significant positive relationship between good wind resources and the presence of wind power as well as with the amount of wind energy installed. This result is consistent with the idea that the first wind power investments in Sweden were highly affected by individual wind energy enthusiasts, while in the more recent large-scale investments market-based judgments about future profitability may have become increasingly important. In addition, previous experience seems to be a factor that in itself facilitates additional future wind power establishments, thereby pointing to the role of accumulated institutional capacity. - Highlights: ► Local differences in installed wind power capacity in Sweden is analysed. ► The amount of installed wind power capacity varies significantly in time and space. ► Results reveal different determinants of installed capacity before/after 2006. ► Good wind resources have become increasingly important over time. ► Previous experience of wind power has a positive impact on installed capacity

  3. 46 CFR 58.10-10 - Diesel engine installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  4. 32 CFR 634.25 - Installation traffic codes.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activit...

  5. Modern electrical installation for craft students

    CERN Document Server

    Scaddan, Brian

    2013-01-01

    Modern Electrical Installation for Craft Students, Volume 2, Third Edition discusses several topics concerning electrical installations. The book is comprised of eight chapters that deal with craft theory, associated subjects, and electrical industries. Chapter 1 covers inductors and inductance, while Chapter 2 tackles capacitors and capacitance. Chapter 3 deals with inductance and capacitance in installation work. The book also discusses cells, batteries, and transformers. The electrical industries, control and earthing, and testing are also dealt with. The last chapter discusses the basic el

  6. A novel method for coiled tubing installation

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Peter J. [2H Offshore, Houston, TX (United States); Tibbetts, David [Aquactic Engineering and Construction Ltd., Aberdeen (United Kingdom)

    2009-12-19

    Installation of flexible pipe for offshore developments is costly due to the physical cost of the flexible pipe, expensive day rates and the availability of suitable installation vessels. Considering the scarcity of flexible pipe in today's increasingly demanding and busy market, operators are seeking a cost effective solution for installing piping in a range of water depths using vessels which are readily on hand. This paper describes a novel approach to installing reeled coiled tubing, from 1 inch to 5 inch diameter, from the back of a small vessel in water depths from 40 m up to around 1000 m. The uniqueness of the system is the fact that the equipment design is modular and compact. This means that when disassembled, it fits into standard 40 ft shipping containers, and the size allows it to be installed on even relatively small vessels of opportunity, such as anchor handling or installation vessels, from smaller, and cheaper quay side locations. Such an approach is the ideal solution to the problem faced by operators, in that it allows the installation of cheaper, readily available coiled tubing, from cost-effective vessels, which do not need to transit to a pick up the system. (author)

  7. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects......; Transforming materiality; Adding virtual objects; 3D effects; Complex content on simple objects or simple content on complex; Strong versus loose connections between the physical object and the digital content. This paper is based on four cases, two of which concern cultural heritage installations, the others...

  8. Python Introduction and Installation

    OpenAIRE

    William J. Turkel; Adam Crymble

    2012-01-01

    This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo ...

  9. Lietojumprogrammu instalāciju izveides risinājumi

    OpenAIRE

    Zālītis, Mārtiņš

    2010-01-01

    Bakalaura darbā „Lietojumprogrammu instalāciju izveides risinājumi” mērķis ir izanalizēt lietotājam draudzīgas un nedraudzīgas instalācijas, kā arī salīdzināt instalāciju veidošanas rīkus, norādot uz to stiprajām un vājajām pusēm. Lai izpētītu instalāciju izveides iespējas tiek izmantota tīmeklī pieejamā informācija, autora darbs ar instalāciju rīkiem un to novērtējums. Parādīta sarežģītas instalācijas uzbūve, kas izveidota ar NSIS instalāciju rīku, kuru arī autors atzīst par labāko risinājum...

  10. Lessons learned from installation of an environmental horizontal well

    International Nuclear Information System (INIS)

    Oakley, D.B.; Nickelson, M.D.

    1994-01-01

    At Williams Air Force Base near Phoenix, Arizona, a Pilot Study/Demonstration Study is being performed to evaluate the effectiveness of horizontal vs vertical wells in remediating and containing a jet fuel contaminant plume. An early stage of this project included successful installation of the world's longest, deepest environmental horizontal well. The horizontal well was installed using river crossing technology developed for drilling boreholes and installing utility conduits under rivers. Boreholes more than 5,000 ft. long have been successfully installed using river crossing technology. However, these boreholes are typically shallower than 100 ft. below land surface. Installation of the environment horizontal well proved to be extremely challenging because of the depth, the length of the borehole, and the requirements dictated by well installation criteria. Two installation attempts failed before the successful installation. The first installation attempt failed during well material installation. The second attempt resulted in the drill string becoming permanently stuck and abandoned downhole. The history of the two failed and one successful installation attempts demonstrates several lessons learned, including (1) streamline the well materials installation process as much as possible; (2) guar-gum-based drilling muds do not have the gel strength to remove sufficient cuttings from deep boreholes; (3) if sandpack around the well screen is required, a prepack screen should be installed--avoid using tremie pipes for installing a sandpack; (4) drill string location information provided by surface magnetic systems is unreliable at 150 ft. or more bls; and (5) for difficult drilling conditions, 24 hr./day drilling is recommended

  11. Importance of human factors on nuclear installations safety

    International Nuclear Information System (INIS)

    Caruso, G.J.

    1990-01-01

    Actually, installations safety and, in particular the nuclear installations infer a strong incidence in human factors related to the design and operation of such installations. In general, the experience aims to that the most important accidents have happened as result of the components' failures combination and human failures in the operation of safety systems. Human factors in the nuclear installations may be divided into two areas: economy and human reliability. Human factors treatments for the safety evaluation of the nuclear installations allow to diagnose the weak points of man-machine interaction. (Author) [es

  12. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  13. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  14. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  15. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  16. Current Monitoring System for ITER Like ICRH Antenna

    International Nuclear Information System (INIS)

    Argouarch, A.

    2006-01-01

    On TS antennas, the power transfer optimization from ICRH antenna to Plasma load is performed using feedback internal matching system. Experimental handling is required to mach the reactive impedance accordingly to the fluctuant plasma loading. As part of the development of the new ICRH prototype antenna, an additional measurement system based on Rogowski coils was developed to monitor the current distribution in antenna straps. The objective is to control module and phase of the antenna current straps with measurement provided by the coil system. Matching capacitors values, generators power and phase can also be controlled using the output of the devices, improving the real time matching control of the array. This paper details the new measurement layout, the Rogowski coil, and the whole system connected on each strap design for RF currents measurement between 40 MHz - 60 MHz for maximum amplitude of 1 kA. On the new ICRH prototype antenna, the measurement coils are coupled to the point where the strap currents are short circuited to the frame. The module and phase measurements are performed with the coils by direct magnetic induction in a vacuum and high temperature environment. Also, the Rogowski coils were characterized at low level power with vector network analyzer and the design adapted in order to obtain a controlled and reproducible gain in the desire bandwidth. The transconductive function is established with an experimental gain near -80 dB between primary circuit and inductive signal generated by the Rogowski coil. In a second step, the system with its associated electronic was qualified under high RF power. First results with high RF current (closed to 500 A at 57 MHz) match the desire Rogowski coil response. Compromises with electrical response at low power level and the coil under thermal/RF stresses were the most challenging part of the development. The overall response of the system and the current module/phase measurements are promising. A proper

  17. Fuel followed control rod installation at AFRRI

    International Nuclear Information System (INIS)

    Moore, Mark; Owens, Chris; Forsbacka, Matt

    1992-01-01

    Fuel Followed Control Rods (FFCRs) were installed at the Armed Forces Radiobiology Research Institute's 1 MW TRIGA Reactor. The procedures for obtaining, shipping, and installing the FFCRs is described. As part of the FFCR installation, the transient rod drive was relocated. Core performance due to the addition of the fuel followed control rods is discussed. (author)

  18. The insurance of nuclear installations

    International Nuclear Information System (INIS)

    Francis, H.W.

    1977-01-01

    A brief account is given of the development of nuclear insurance. The subject is dealt with under the following headings: the need for nuclear insurance, nuclear insurance pools, international co-operation, nuclear installations which may be insured, international conventions relating to the liability of operators of nuclear installations, classes of nuclear insurance, nuclear reactor hazards and their assessment, future developments. (U.K.)

  19. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  20. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  1. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  2. Seismic studies for nuclear installations sites

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Faure, J.

    1988-01-01

    The french experience in seismic risks assessment for french nuclear installations permits to set out the objectives, the phases the geographic extensions of workings to be realized for the installation safety. The data to be collected for the safety analysis are specified, they concern the regional seismotectonics, the essential seismic data for determining the seism level to be taken into account and defining the soil movement spectra adapted to the site. It is necessary to follow up the seismic surveillance during the installation construction and life. 7 refs. (F.M.)

  3. Installation for producing sealed radioactive sources

    International Nuclear Information System (INIS)

    Fradin, J.; Hayoun, C.

    1969-01-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [fr

  4. Installing a HDPE vertical containment and collection system in one pass utilizing a deep trencher

    International Nuclear Information System (INIS)

    Bocchino, W.M.; Burson, B.

    1997-01-01

    A unique method has been developed to install high density polyethylene (HDPE) vertical containment panels and a horizontal collection system for the containment and collection of contaminated groundwater. Unlike other means of creating this type of system, this barrier wall and collection system is installed in one step and in one narrow trench, utilizing a one-pass deep trencher. Originally HDPE vertical barriers were installed using conventional slurry trenching techniques. Use of this method raised questions of trench stability and disposal costs for the trench spoils. In addition, if a collection system was desired, a separate trench or vertical wells were required. In response to these concerns, a trenchless vibratory installation method was developed. Although this method addressed the concerns of trench stability and disposal costs, it raised a whole new set of concerns dealing with drivable soil conditions, buried debris and obstructions. Again, if a collection system was desired, a separate trench or vertical wells had to be installed. The latest development, the one-pass, deep trencher, has eliminated or significantly reduced the previously discussed construction concerns. The trencher methods reduce the amount of spoils generated because a trench width of 61 cm (24 inches) is constantly maintained by the machine. Additionally, soil classification and density are not as critical as with a vibratory installation. This is due to the trencher's ability to trench in all but the hardest of materials (blow counts exceeding 35 blows/ft). Finally, the cost to add a collection system adjacent to the cutoff wall is substantially reduced and is limited only to the cost of the additional hydraulic fill and 4 inches HDPE collection piping. The trench itself is already constructed with the installation of the wall

  5. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  6. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  7. 49 CFR 393.30 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY...

  8. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  9. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  10. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  11. Nuclear installations and their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October 15, 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (authors)

  12. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  13. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  14. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  15. Development regulation regarding with licensing of nuclear installation

    International Nuclear Information System (INIS)

    Bambang Riyono; Yudi Pramono; Dahlia Cakrawati Sinaga

    2011-01-01

    Provisions of Article 17 paragraph (3) of Law Number 10 Year 1997 on Nuclear cleary mandates for the establishment of government regulations (GR) on Nuclear licensing containing the requirements and procedure, both from the standpoint of their utilization and installation. To use has been rising GR No.29 Year 2008 on the Use of Ionizing Radiation Sources and Nuclear Materials, while for the installation has been published PP No.43 Year 2006 on Nuclear Reactor Licensing, and BAPETEN Chairman Decree No.3 Year 2006 on Non-reactor Nuclear Installation Licensing. Based on the background of the preparation of both the aforementioned are just regulate the reactor and utilization, not yet fully meet the mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear, including other nuclear installations. For these reasons, it initiated the need for a separate regulation containing provisions concerning licensing of non-reactor nuclear installations. On the other side from the understanding the legal aspects and interpretations of the Law No.10 of 2004 on the Establishment Regulation Legislation, should be in single mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear would only produce one of the requirements and procedure for the use or installation, or a maximum of two (2) GR related licensing the use and installation. This is encourages conducted the assessing or studies related to how possible it is according to the legal aspect is justified to combine in one Nuclear licensing regulations regarding both the use and installation, by looking at the complexity of installation and wide scope of utilization of nuclear energy in Indonesia. The results of this paper is expected to provide input in the preparation of GR on licensing of nuclear installations. (author)

  16. Decommissioning and dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Pelzer, N.

    1993-01-01

    The German law governing decommissioning and dismantling of nuclear installations can be called to be embryonic as compared to other areas of the nuclear regulatory system, and this is why the AIDN/INLA regional meeting organised by the German national committee in July 1992 in Schwerin has been intended to elaborate an assessment of the current legal situation and on this basis establish proposals for enhancement and development, taking into account the experience reported by experts from abroad. The proceedings comprise the paper of the opening session, 'Engineering and safety aspects of the decommissioning of nuclear installations', and the papers and discussions of the technical sessions entitled: - Comparative assessment of the regulatory regimes. - Legislation governing the decommissioning of nuclear installations in Germany. - Analysis of the purpose and law making substance of existing regulatory provisions for the decommissioning of nuclear installations. All seventeen papers of the meeting have been prepared for separate retrieval from the database. (orig./HSCH) [de

  17. Culture safety in the nuclear installation

    International Nuclear Information System (INIS)

    Benar Bukit

    2008-01-01

    Culture safety is aimed to empower all the personnel to contribute and responsible to the installation safety where they work in. Culture safety is important as there were so many accidents happened due to the little attention given to the safety, take as examples of what happened in Three Mille Island installation (1979) and Chernobyl (1986). These remind us that human factor gives a significant contribution to the failure of operational system which influences the safety. Therefore, as one of institutions which has nuclear installation. National Nuclear Energy Agency must apply the culture safety to guarantee the safety operation of nuclear installation to protect the personnel, community and environment from the hazard of radioactive radiation. Culture safety has two main components. The first component under the management responsibility is a framework needed in an organisation. The second component is the personnel attitude in al/ levels to respond and optimize those framework. (author)

  18. Notes on LED Installations in Street Illumination

    Directory of Open Access Journals (Sweden)

    Elisabeta Spunei

    2014-09-01

    Full Text Available The paper presents a study made on choosing LED street lighting installations, such that the quality requirements for exterior artificial lighting are fulfilled. We analyze two types of LED street lighting installations from a technical point of view, together with lighting level and brightness values obtained during the measurements. Following on the field measurements, the lighting quality parameters are calculated, and, for the lighting installation with the best performance, optimal mounting suggestions are made. The optimal quality parameters are calculated by simulations using the Dialux software. The same software and the same light sources we also compute an optimal street lighting by determining the size of the installation that provides the best lighting parameter values.

  19. Civilian protection and Britain's commercial nuclear installations

    International Nuclear Information System (INIS)

    1981-01-01

    The subject is treated as follows: initial conclusions (major nuclear attack on military installations; nuclear attack including civil nuclear targets; conventional attack on civil nuclear installations); nature of nuclear weapons explosions and power reactor releases (general; dose effects and biologically significant isotopes; nuclear weapon effects; effect of reactors and other fuel-cycle installations in a thermonuclear area; implications of reactor releases due to conventional attack, sabotage, civil disorder or major accident). (U.K.)

  20. 14 CFR 25.1703 - Function and installation: EWIS.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...

  1. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  2. Risk assessment techniques for industrial installations

    International Nuclear Information System (INIS)

    Croitoru, C.; Dumitrescu, M.; Preda, I.; Stefanescu, I.; Titescu, G.

    1995-01-01

    This paper presents a risk analysis which concerns the following stages: identification of the initiation events, evaluation of the occurrence frequency of different accident sequences, assessment of human, economical, and environmental consequences, risk assessment and management. The study of the accident sequences subsequent to an initiation event was achieved by the event tree method. Also, there were developed methods based on mathematical models of installations which take into account reliability data, data concerning the exploitation history, and data referring to the human factor effects in the installation operation. These methods were used for the determination of occurrence frequencies of hydrogen sulfide emission accidents in the heavy water production installations

  3. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P. [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines

  4. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines comprennent la seismicite

  5. Installation of beam screens in LHC arc cryomagnets

    CERN Document Server

    Cruikshank, P; Schneider, G; Veness, R J M

    1999-01-01

    Beam screens will be installed in the cold bores of the LHC arc cryodipoles and Short Straight Sections (SSS). This note describes the constraints on the beam screen installation imposed by the beam vacuum interconnects and Beam Position Monitors (BPM), and explains the installation scenario which has been adopted.

  6. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site

  7. Installation Service - Changes in opening hours

    CERN Multimedia

    GS Department

    2010-01-01

    For organizational matters, please note that, as from 15 March 2010, the Installation Service will have wen opening hours. The new schedule will be from 14:00 to 17:00 (Monday to Friday). Contact persons are: Martine Briant, Karine Robert and Claudia Bruggmann. The office address remains 73-3-014. Installation Service

  8. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photo 01: Pictured with the newly installed magnet and transport system in the transfer line tunnel are (left to right) Volker Mertens, responsible for the LHC injection and transfer lines; personnel involved in tr...

  9. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photos 01, 02: Pictured with the newly installed magnet and transport system in the transfer line tunnel are LHC project leader Lyn Evans (second left, white helmet); Volker Mertens, responsible for the LHC injecti...

  10. Update of the database of photovoltaic installations in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.; Bruhns, H.

    1999-07-01

    The article describes an updated database of photovoltaic (PV) installations in the UK. The database contains more than 300 records representing over 40,000 photovoltaic installations with more than 100 buildings that use photovoltaic arrays. Figures show: (i) a chart of cumulative PV applications to date; (ii) a chart of cumulative installations in the database; (iii) the growth of Building Integrated PV installed to date; (iv) the cumulative growth of peak power of PV for buildings installed every year since 1985; (v) the distribution by application of all PV installations in the database and (vi) the various applications of PV installations.

  11. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  12. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    Science.gov (United States)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  13. Report by the national commission of assessment of financing of costs of decommissioning base nuclear installations and installations of management used fuels and radioactive wastes (CNEF) - July 2012

    International Nuclear Information System (INIS)

    Lepine, J.L.

    2012-07-01

    This report is a first assessment of the control which must be performed by the administrative authority to ensure the compliance with long term financial obligations for operators of base nuclear installations. After a presentation of the administrative authority, this document reports the assessment of liabilities and of dedicated assets, and the remarks made by the commission regarding the administrative authority organisation and function, the previous assessments, uncertainties concerning the cost of the deep geological storage project, and the future activity of the Commission

  14. Multi-scale sensitivity analysis of pile installation using DEM

    Science.gov (United States)

    Esposito, Ricardo Gurevitz; Velloso, Raquel Quadros; , Eurípedes do Amaral Vargas, Jr.; Danziger, Bernadete Ragoni

    2017-12-01

    The disturbances experienced by the soil due to the pile installation and dynamic soil-structure interaction still present major challenges to foundation engineers. These phenomena exhibit complex behaviors, difficult to measure in physical tests and to reproduce in numerical models. Due to the simplified approach used by the discrete element method (DEM) to simulate large deformations and nonlinear stress-dilatancy behavior of granular soils, the DEM consists of an excellent tool to investigate these processes. This study presents a sensitivity analysis of the effects of introducing a single pile using the PFC2D software developed by Itasca Co. The different scales investigated in these simulations include point and shaft resistance, alterations in porosity and stress fields and particles displacement. Several simulations were conducted in order to investigate the effects of different numerical approaches showing indications that the method of installation and particle rotation could influence greatly in the conditions around the numerical pile. Minor effects were also noted due to change in penetration velocity and pile-soil friction. The difference in behavior of a moving and a stationary pile shows good qualitative agreement with previous experimental results indicating the necessity of realizing a force equilibrium process prior to any load-test to be simulated.

  15. 46 CFR 119.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... an exhaust pipe. (b) Exhaust gas must not leak from the piping or any connections. The piping must be...

  16. 30 CFR 57.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or... wiring. ...

  17. Installations of SNCR on bark-fired boilers

    International Nuclear Information System (INIS)

    Hjalmarsson, A.K.; Hedin, K.; Andersson, Lars

    1997-01-01

    Experience has been collected from the twelve bark-fired boilers in Sweden with selective non catalytic reduction (SNCR) installations to reduce emissions of nitrogen oxides. Most of the boilers have slope grates, but there are also two boilers with cyclone ovens and two fluidized bed boilers. In addition to oil there are also possibilities to burn other fuel types in most boilers, such as sludge from different parts of the pulp and paper mills, saw dust and wood chips. The SNCR installations seems in general to be of simple design. In most installations the injection nozzles are located in existing holes in the boiler walls. The availability is reported to be good from several of the SNCR installations. There has been tube leakage in several boilers. The urea system has resulted in corrosion and in clogging of one oil burner. This incident has resulted in a decision not to use SNCR system with the present design of the system. The fuel has also caused operational problems with the SNCR system in several of the installations due to variations in the moisture content and often high moisture content in bark and sludge, causing temperature variations. The availability is presented to be high for the SNCR system at several of the plants, in two of them about 90 %. The results in NO x reduction vary between the installations depending on boiler, fuel and operation. The emissions are between 45 and 100 mg NO 2 /MJ fuel input and the NO x reduction rates are in most installations between 30 and 40 %, the lowest 20 and the highest 70 %. 13 figs, 3 tabs

  18. The Swiss nuclear installations annual report 1992

    International Nuclear Information System (INIS)

    1993-06-01

    This report concerns the safety of the Swiss nuclear installations in the period of 1992. Surveillance of these installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). In Switzerland five nuclear power plants are operational: Beznau I and II, Muehleberg, Goesgen and Leibstadt. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basle. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut down experimental reactor of Lucens, the exploration in Switzerland of final disposal facilities for radwaste and the interim radwaste storage facilities. The present report first deals with the nuclear power plants and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK (chapters 1-4). In chapter 5, the corresponding information is given for the research installations. Chapter 6 on radwaste disposal is dedicated to the waste treatment, waste from reprocessing, interim storage and exploration by the NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' vicinity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into some general questions relating to the safety of nuclear installations, and in particular covers important events in nuclear installations abroad. In all, the operation of the Swiss nuclear installations in the period of 1992 is rated safe by HSK. (author) 7 figs., 13 tabs

  19. 562,3 MWP installed in european union

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    In the end, the growth problems that were announced for the European photovoltaic market did not happen. With 170 MWp of additional capacity installed in the European Union 2003 has marked a new record high in installations bringing European installed capacity up to the neighbourhood of 562 MWp. While this sector's expansion has been remarkable (+ 43.4 % with respect to 2002), a lot of questions still remain with respect to the true will of certain countries to develop this form of energy. (author)

  20. 49 CFR 192.321 - Installation of plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  1. Evaluation of Installation Time for SMASHmount by SMASHsolar

    Energy Technology Data Exchange (ETDEWEB)

    2017-04-05

    The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewable Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.

  2. Canberra Alpha Sentry Installation Functional Design Criteria (FDC)

    International Nuclear Information System (INIS)

    WHITE, W.F.

    1999-01-01

    This document provides the functional design criteria for the installation of the Canberra Alpha Sentry System at selected locations within the Plutonium Finishing Plant (PFP). The equipment being installed is identified by part number in Section 3 and the locations are given in Section 5. The design, procurement and installation are assigned to Fluor Federal Services

  3. An earth anchor system: installation and design guide.

    Science.gov (United States)

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  4. Evaluating the Effect of a Mechanical Adjunct to Improve the Installation of Child Restraint Systems to Vehicles.

    Science.gov (United States)

    Mirman, Jessica H; Seifert, Sara J; Zonfrillo, Mark R; Metzger, Kristi; Durbin, Dennis R; Arbogast, Kristy B

    2015-01-01

    We explored if an alternative CRS design that utilized a mechanical adjunct to amplify the force applied to the adult seat belt (intervention CRS) results in more accurate and secure attachment between the CRS and the vehicle compared to similar CRS models that use LATCH or the existing adult seat belt. We conducted three separate studies to address this question and additionally explored: (1) the contribution of prior CRS installation experience (Study 1), (2) the value-added of CRS labeling (Study 2), and (3) paper-based vs. video instructions (Study 3). In Studies 1 and 2 we assessed a forward facing combination CRS design (intervention CRS) compared to a commercially available LATCH equipped model (control CRS) and in Study 3 we conducted a similar study using a convertible model of both the intervention and control CRS. Participants installed both CRS in a contemporary minivan and could choose which type of attachment to use for the control CRS (LATCH or seat belt); order of installation was counter-balanced. Evaluators systematically examined installations for accuracy and security. Study 1: A greater proportion of participants in both the experienced and inexperienced groups was able to securely install the intervention CRS compared to the control CRS: (45% vs. 16%, p =.0001 for experienced) and (37% vs. 6%, p =.003 for inexperienced). No differences between the CRS were observed for accuracy of installation in either user group. Study 2: A greater proportion of participants were able to securely install the enhanced intervention CRS compared to the control CRS: (62% vs. 9%, p =.001). The intervention CRS demonstrated reduced installation accuracy: (30% vs. 61%, p =.001). Study 3: A greater proportion of participants was able to securely install the intervention CRS compared to the control CRS: 79% vs. 66% p =.03, but this effect was smaller than in the previous studies. Participants were less likely to achieve an accurate installation with the intervention

  5. New technique for landfill leachate well installation

    International Nuclear Information System (INIS)

    Hornsby, R.G.; Miller, M.S.

    1991-01-01

    The installation method fulfilled our expectations. The entire well installation took eight writing days to complete, for an average of two wells per day. It met our Health and Safety, waste volume, environmental risk and uniform sandpack expectations. Health and Safety concerns were minimal. We found that virtually all work could be completed using Level D protection. The volume of waste produced by the well installation was extremely low. The core samples and casing scrapings were the only well installation wastes directly produced. The waste containers which required sampling prior to disposal were: Decontaminated water (330 gallons), Personnel protective equipment and water (715 gallons), Soil cores (25 gallons), Land leachate (440 gallons). Each waste type was sampled and submitted to a laboratory for analyses of full Appendix 3 plus U.S. EPA toxicity parameters. The results verified that all of the wastes could be disposed of on-site. Since the only drilling wastes were the clay core samples and the very small amount of material adhering to the casing, contamination of the new clay cap did not occur. A uniform sandpack was guaranteed through the use of a presanded well screen. The loose sand added when the casing was removed served to fill any voids. All the leachate wells have water in them, and it appears that they will function adequately. We are in the process of constructing a treatment and storage facility to manage the liquids to be extracted for off-site disposal. The long-term effectiveness of the wells will be quantified. This well installation method should be considered in situations requiring the following: expedited installation; reduced Health and Safety concerns; reduced disposal costs; reduced potential for adverse environmental impact; and comparable installation costs. The choice of this method must include considerations of the subsurface geology and the nature of any manmade materials

  6. Department of the Army Installation Restoration Program

    International Nuclear Information System (INIS)

    Anderson, A.W.

    1988-01-01

    The Army's Installation Restoration Program (IRP) was established in 1975 in response to regulatory action at several installations where past disposal practices had caused contamination of streams and groundwater. The need to decontaminate excess Army-owned real estate also was considered in early IRP activities. A variety of site types have been discovered on Army installations. The major site types evaluated to date include: contaminated soil areas, landfills, lagoons, buildings, burning grounds, sumps, pits, storage tanks, sewage treatment plants, storage pads, industrial wastewater treatment plants, and salvage yards. Twenty Army installations have been proposed for or listed on the National Priorities List (NPL). The need for taking action at hazardous waste sites, however, is based on threats they pose to human health, welfare or the environment. Sites do not have to be on the SPL in order to be cleaned up through IRP activities. All of the sites that caused Army installations to be proposed for the NPL are being evaluated and cleaned up. In addition, all Army properties have been or will be assessed and where needed they will be addressed by the IRP

  7. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  8. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  9. Performance of cooling installation for cyclotron Decy-13

    International Nuclear Information System (INIS)

    Edi Trijono Budisantoso; Suprapto; Sutadi

    2015-01-01

    Has been calculated the cooling installation performance of Decy-13 cyclotron. The cooling installation is analysed based on the technical specifications of each cooling component to proof the results of the design and implementation of installations meet the cooling requirement. Analysis of loss of pressure and flow rate in the piping installation is done empirically using Hazen-Williams equation while the analysis of heat transfer processes in the cooling tower is done using the help of psychometric charts that available. Cooling component consists of a condenser and associated piping systems with cooling towers and equipped with a pump to push the circulation of cooling. The calculations show that the installation of the condenser cooler uses the cooling tower LiangChi LBC-30 with a booster pump Grundfos 4 kW NF30-36T powered 47kW able to transfer heat with the coolant flow rate 136 lpm, input to output coolant pressure difference 2.1atm and the cooling temperature difference 5 °C. Conclusion of the calculation is the technical specifications of cooling components and installation already meets the needs of the cooling expected. (author)

  10. Installing Ubuntu Enterprise Cloud in a Physical Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to “Guidelines for Building a Private Cloud Infrastructure.” This supplemental material provides guidance on how to install Ubuntu Enterprise Cloud in a physical environment. The purpose of this document is to provide a practical, step......-by-step, detailed guide on how to pre-configure and install the machines and network. For more detailed description of the steps, a reader is advised to refer to another supplemental book named “Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment.” There are a few more details, accompanied...... with screenshots. The material included in this supplemental document is based on the installation that was performed in a physical environment based on HP ProLiant DL380 G4 servers, 100 Mbit/s witches, and a firewall/router that isolated the whole solution. The cloud installation was performed using the (for...

  11. Installation of an accelerator from theory to practice

    CERN Document Server

    Foraz, K; Weisz, S; CERN. Geneva. TS Department

    2004-01-01

    The size and complexity of the LHC project at CERN calls for a strong co-ordination of all installation activities. The detailed installation planning has to take into account many constraints such as the component production rates, the installation contracts or the transport and handling requirements in a narrow tunnel with limited access points. The planning also needs to be flexible enough to cope with aleas that are unavoidable in such a large project that spans over many years. This paper describes the follow-up methodology, both in the field and in the office, adopted by the IC team to assist the groups involved in the installation of the LHC machine.

  12. Challenges and solutions for installing an intelligent completion in offshore deepwater Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Reyes, Alfonso R. [WellDynamics, Spring, TX (United States); Arias, Jose Luiz [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    This paper describes an atypical and challenging Intelligent Well Completion (IWC) installed in ultra deep water (1500-2000 m), offshore Brazil. The well is a water injector designed to selectively control the injection flow rate in to two stacked gravel pack zones. The field is Roncador, approximately 150 kilometers offshore the North-Eastern coast of the state of Rio de Janeiro, Brazil. This application is an atypical IWC due to the long distance ({approx}15 Km) from the production platform to the well. Intelligent wells have been installed at such distances previously but never with a direct control umbilical. Previous completions used a Subsea Control Module (SCM) or pod located in the wellhead. Reduced intervention costs are the typical driver for IWC in deep water applications, but water management is becoming an increasingly common application. The Roncador field development team has taken a novel approach by using IWC to manage water injection in an ultra deep water development. The challenge for the project team was to design an IWC system, which would accommodate the field infrastructure constraint, require minimal modification to the existing subsea hardware and ensure the necessary flexibility to locate surface equipment without the need for modification to the production facilities. The solution adopted for Roncador 35 is mainly based on an emerging ISO standard for the integration of IWC into Subsea Production Systems. The modular and expandable approach will enable extension of this solution to other wells in the Roncador field. (author)

  13. Entropy and Digital Installation

    Directory of Open Access Journals (Sweden)

    Susan Ballard

    2005-01-01

    Full Text Available This paper examines entropy as a process which introduces ideas of distributed materiality to digital installation. Beginning from an analysis of entropy as both force and probability measure within information theory and it’s extension in Ruldof Arnheim’s text ‘Entropy and Art” it develops an argument for the positive rather thannegative forces of entropy. The paper centres on a discussion of two recent works by New Zealand artists Ronnie van Hout (“On the Run”, Wellington City Gallery, NZ, 2004 and Alex Monteith (“Invisible Cities”, Physics Room Contemporary Art Space, Christchurch, NZ, 2004. Ballard suggests that entropy, rather than being a hindrance to understanding or a random chaotic force, discloses a necessary and material politics of noise present in digital installation.

  14. Offshore wind transport and installation vessel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The initial objective of the project was to complete a feasibility study to determine the viability of an innovative transportation vessel to be deployed in the installation of offshore wind farms. This included the feasibility of providing a stable-working platform that can be used in harsh offshore environments. A study of current installation contractors and their installation equipment was used to provide a preliminary specification for the installation vessel. A typical barge was selected and a number of hydrodynamic analyses were carried out in order to establish it's on course and operational stability. The analysis proved the stability of the vessel during operation was critical and that in order to utilise the crane's full potential a stabilisation system must be employed. The main aim of the work to date was to establish whether it was feasible to use a stabilisation system on the installation vessel. The spud leg FEED study established that it was feasible to use spud legs to stabilise the vessel. In order to achieve the degree of stability required it is necessary to lift the vessel completely out of the water. This was not the original aim of the study but due to the external loads on the hull it was the only viable option. Lifting the vessel out of the water results in the legs and leg casings becoming very large. This has a number of consequences for the final design. Due to large loads on the legs spud cans must be used to avoid bottom penetration, the spud cans increase the draft of the vessel by 2m. The large loads require larger winches and more reeving to be used, this results in larger pumps and motors, all of which have to be housed. The stabilisation system has been proved to be feasible for a large installation vessel, the cost and physical size are however more excessive than first anticipated. (Author)

  15. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  16. 14 CFR 27.967 - Fuel tank installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 27.967 Section 27.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a...

  17. 14 CFR 29.967 - Fuel tank installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 29.967 Section 29.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.967 Fuel tank installation...

  18. 14 CFR 25.967 - Fuel tank installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installations. 25.967 Section 25.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations...

  19. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  20. Evaluation Of RSG-GAS Power Installed After 12 Years

    International Nuclear Information System (INIS)

    Mrsahala, Yan Bony

    2001-01-01

    The total power installed in RSG-GAS electric system less then 3 x 2500 KVA. Some of powers installed included are the never used loads, so the operationally total load installed that regularly operational and incidental are amount about 3700 KVA. In this condition, the capacity of power transformer installed 3 x 2500 KVA becomes larger. The influences of the numinous power are electric bill payment by RSG-GAS. The reduces power installed may be done as well as remember that some of the load not be operation so that the power consume for that facility could be cut off. The evaluation and calculation result gives some alternatively can be selected to minimize the electric bill payment

  1. An application of residual current protective device at electrical installation

    International Nuclear Information System (INIS)

    Firman Silitonga

    2008-01-01

    In an electrical installation, a protection for overload and short circuit are always to be installed. In addition to the installation, it is necessary to be installed a protection device for residual current because both the short circuit and the overload device protection will not work for the residual current. The quantity of the residual current must be defined first at any electrical installation to define an appropriate residual current protection so that not every residual current will break the circuit down. This paper will explain a method how to install a residual protection device for 3500 VA or more at TN and TT of earthing system. (author)

  2. 30 CFR 77.212 - Draw-off tunnel ventilation fans; installation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Draw-off tunnel ventilation fans; installation... UNDERGROUND COAL MINES Surface Installations § 77.212 Draw-off tunnel ventilation fans; installation. When fans are used to ventilate draw-off tunnels the fans shall be: (a) Installed on the surface; (b...

  3. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  4. The ATLAS software installation system for LCG/EGEE

    Energy Technology Data Exchange (ETDEWEB)

    Salvo, A D [Istituto Nazionale di Fisica Nucleare, sez. Roma 1 (Italy); Barchiesi, A [Universita di Roma I ' La Sapienza' (Italy); Gnanvo, K [Queen Mary and Westfield College (United Kingdom); Gwilliam, C [University of Liverpool (United Kingdom); Kennedy, J; Krobath, G [Ludwig-Maximilians-Universitaet Muenchen (Germany); Olszewski, A [Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences (Poland); Rybkine, G [Royal Holloway College (United Kingdom)

    2008-07-15

    The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within a few hours, have driven the need for an automatic installation system for the LHC experiments. In this work we describe the ATLAS system for the experiment software installation in LCG/EGEE, based on the Light Job Submission Framework for Installation (LJSFi), an independent job submission framework for generic submission and job tracking in EGEE. LJSFi is able to automatically discover, check, install, test and tag the full set of resources made available in LCG/EGEE to the ATLAS Virtual Organization in a few hours, depending on the site availability.

  5. 16 CFR 460.17 - What installers must tell their customers.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false What installers must tell their customers... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all...

  6. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Science.gov (United States)

    2010-07-01

    ...) Cranes and hoists. This paragraph applies to the installation of electric equipment and wiring used in..., and similar events. This paragraph covers the installation of portable wiring and equipment, including... 29 Labor 5 2010-07-01 2010-07-01 false Specific purpose equipment and installations. 1910.306...

  7. Using game engines in mixed reality installations

    NARCIS (Netherlands)

    Nakevska, M.; Vos, E.C.; Juarez, Alex; Hu, J.; Langereis, G.R.; Rauterberg, G.W.M.; Anacleto, J.; Fels, S.; Graham, N.; et al., xx

    2011-01-01

    In a mixed reality installation, a variety of technologies is integrated such as virtual reality, augmented reality, and animated virtual agents and robotic agents. One of the main challenges is how to design and implement a mixed reality installation that integrates a heterogeneous array of sensors

  8. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system. Here we see the transport vehicle alongside the magnet supports. Visible in the background is the first magnet in place.

  9. Design, fabrication and installation of irradiation facilities

    International Nuclear Information System (INIS)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C.

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs

  10. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C. [and others

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs.

  11. Use and regulatory control of dental X-ray installations

    International Nuclear Information System (INIS)

    1999-01-01

    In the guide the safety requirements concerning dental X-ray installations and their use, prerequisities for exemption from a safety licence, and regulatory control are presented. The guide applies to conventional dental X-ray installations, by which an image is created on an X-ray film or other image receptor placed inside the mouth, and panorama tomography installations for dentition and the cephalostats associated with these. The guide does not apply to multitechnique tomography installations intended for the special imaging of the skull or jaws

  12. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  13. Taking into account chemical safety for French basic nuclear installations

    International Nuclear Information System (INIS)

    Tabard, Laurence; Conte, Dorothee

    2013-01-01

    Among nuclear installations, some fuel cycle facilities present a high level of chemical hazards. In France, the TSN law of the 13 June 2006 requires taking into account all the risks generated by a basic nuclear installation (BNI). But, as most of the implementing regulatory texts are under development at this time, part of the previous regulation settled down in the 1990's is still applying: the order of the 31 December 1999 concerning technical regulation in order to prevent and to limit hazards generated by nuclear facilities; the decree of the 4 May 1995 and the order of the 26 November 1999 that deal with BNI discharges. Moreover, some parts of BNI or of nuclear sites can be submitted to the general regulation concerning chemical hazards, which is part of the environment code. As a result, even if the TSN law and its implementing decree Nr 2007-1557 of the 2 November 2007 settle clearly that safety of BNI is not only radiological, but must take into account chemical hazards, the latter aspects are still under development. Moreover the application of the existing regulation, even if complex, has helped to assess chemical risks inside BNI and nuclear sites. (authors)

  14. 49 CFR 192.193 - Valve installation in plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  15. The Management System for Nuclear Installations (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  16. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  17. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  18. Solar Panel Installations on Existing Structures

    OpenAIRE

    Tim D. Sass; Pe; Leed

    2013-01-01

    The rising price of fossil fuels, government incentives and growing public aware-ness for the need to implement sustainable energy supplies has resulted in a large in-crease in solar panel installations across the country. For many sites the most eco-nomical solar panel installation uses existing, southerly facing rooftops. Adding solar panels to an existing roof typically means increased loads that must be borne by the building-s structural elements. The structural desig...

  19. 30 CFR 56.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at... at least 6 feet high and at least 3 feet from any energized parts, casings, or wiring. ...

  20. Installation package for the Solaron solar subsystem

    Science.gov (United States)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  1. 46 CFR 176.702 - Installation tests and inspections.

    Science.gov (United States)

    2010-10-01

    ..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...

  2. Visiting the SPS installation

    CERN Multimedia

    1975-01-01

    ...., Guenther Loehr, Hans Horisberger walk along the SPS tunnel: here, on the right, an absorber block of 22 tons for beam dumping in the external beam lines. The chariot serves for the installation of the block.

  3. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  4. Only one previous owner .

    International Nuclear Information System (INIS)

    Snieckus, Darius

    1999-01-01

    In the light of the large number of offshore platforms earmarked for decommissioning in the next 30 years, a case for re-use is advanced. Henk Vreeswijk of the Netherlands believes that governments should encourage re-use; it makes sense from both an economical and an environmental perspective. Indeed, in the Netherlands, platforms are now being produced with re-use in mind. Elf has recently taken the unprecedented step of advertising a used platform and a subsea installation on the internet. (UK)

  5. Proper Installation of New Windows | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  6. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  7. Installing fonts in LaTeX a user's experience

    NARCIS (Netherlands)

    Hanssen, F.T.Y.

    2003-01-01

    This paper presents a user's experience with installing fonts for use in LaTeX. It will be shown that it is not hard to make a standard Type 1 font work, if you use modern font installation software for LaTeX. All the steps necessary to install the example fonts will be shown. The example fonts used

  8. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  9. First detector installed inside the ALICE solenoid...

    CERN Multimedia

    2006-01-01

    ALICE's emblematic red magnet welcomed its first detector on 23 September, when the array of seven Cherenkov detectors, named HMPID, was successfully installed. ALICE team members standing in front of the completed HMPID detector.The red magnet, viewed from its front opening. The HMPID unit, seen from the back (top right corner of photo) is placed on a frame and lifted onto a platform during the installation. After the installation of the ACORDE scintillator array and the muon trigger and tracking chambers, the ALICE collaboration fitted the first detector inside the solenoid. The HMPID, for High Momentum Particle Identification, was installed at the 2 o'clock position in the central and most external region of the space frame, just below the solenoid yoke. It will be used to extend the hadron identification capability of the ALICE experiment up to 5 GeV/c, thus complementing the reach of the other particle identification systems (ITS, TPC and TOF). The HMPID is a Ring Imaging Cherenkov (RICH) detector in a...

  10. Piezometer installation and monitoring procedure: Revision 1

    International Nuclear Information System (INIS)

    1987-04-01

    The Deaf Smith County (Texas) site has been selected by the US Department of Energy as one of three candidate sites for characterization to determine its suitability as a geologic repository for high-level nuclear waste. The installation and monitoring of piezometers has been identified as one of the tasks required during the development of an underground Exploratory Shaft Facility to satisfy specific information needs through a program of in situ testing, instrumentation and monitoring. The scope of piezometer installation and monitoring encompasses the installation of fluid pressure measuring equipment and the subsequent collection, presentation and interpretation of piezometric data from strata surrounding the Exploratory Shaft Facility (ESF) prior to, during and following construction of the ESF, and as part of geohydrologic testing within the ESF. This procedure describes the required instrumentation, equipment, and sequence of activities for piezometer installation in the ESF. The procedure also includes details on the data recording and presentation requirements, personnel responsibilities, test management and quality assurance. 16 refs., 12 figs., 2 tabs

  11. Industrial installation surveillance acoustic device

    International Nuclear Information System (INIS)

    Marini, Jean; Audenard, Bernard.

    1981-01-01

    The purpose of this invention is the detection of possible impacts of bodies migrating inside the installation, using acoustic sensors of the waves emitted at the time of impact of the migrating bodies. This device makes it possible to take into account only those acoustic signals relating to the impacts of bodies migrating in the area under surveillance, to the exclusion of any other acoustic or electric perturbing phenomenon. The invention has a preferential use in the case of a linear shape installation in which a fluid flows at high rate, such as a section of the primary system of a pressurized water nuclear reactor [fr

  12. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Eoliennes en Suisse. Liste de controle pour investisseurs de grandes installations

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  13. You're a What? Solar Photovoltaic Installer

    Science.gov (United States)

    Torpey, Elka Maria

    2009-01-01

    This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…

  14. Physical installation of Pelletron and electron cooling system

    International Nuclear Information System (INIS)

    Hurh, P.

    1997-01-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here

  15. Installation Test of Cold Neutron Soruce In-pool Assembly

    International Nuclear Information System (INIS)

    Lee, Kye Hong; Choi, J.; Wu, S. I.; Kim, Y. K.; Cho, Y. G.; Lee, C. H.; Kim, K. R.

    2006-04-01

    Before installation of the final cold neutron source in-pool assembly (IPA) in the vertical CN hole at the HANARO, the research reactor, the installation test of IPA has been conducted in the CN hole of the reactor using a full-scaled mock-up in-pool assembly. The well-known cold neutron sources, being safely operated or being now constructed, had been constructed together with each research reactor; therefore, there was little limitation to obtain the optimal cold neutron source since a cold neutron source had been decided to be installed in the reactor from the beginning of the design for the reactor construction. Unlikely, the HANARO has been operated for 10 years so that we have got lots of design limitation in terms of the decisions in the optimal shape, size, minimal light-water gap, and adhesion degree to the CN beam tube, IPA installation tools, etc. for the construction of the CNS. Accordingly, the main objective of this test is to understand any potential problem or interference happened inside the reactor by installing the mock-up IPA and installation bracket. The outcomes from this test is reflected on the finalizing process of the IPA detail design

  16. Rules and regulations on ionizing radiations sources installations

    International Nuclear Information System (INIS)

    1980-01-01

    The finality of this legislative text is to establish the standards and procedures for site, design, building, operation and decommissioning of nuclear installations, radioactive installations and ionizing radiations sources. This text include the commercialization of radioactive substances and equipment fabrication

  17. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  18. Classified installations for environmental protection subject to declaration. Tome 2

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Legislation concerning classified installations govern most of industries or dangerous or pollutant activities. This legislation aims to prevent risks and harmful effects coming from an installation, air pollution, water pollution, noise, wastes produced by installations, even aesthetic bad effects. Pollutant or dangerous activities are defined in a list called nomenclature which obliged installations to a rule of declaration or authorization. Technical regulations ordered by the secretary of state for the environment are listed in tome 2

  19. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  20. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  1. 46 CFR 11.470 - Officer endorsements as offshore installation manager.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Officer endorsements as offshore installation manager... Officer endorsements as offshore installation manager. (a) Officer endorsements as offshore installation manager (OIM) include: (1) OIM Unrestricted; (2) OIM Surface Units on Location; (3) OIM Surface Units...

  2. Offshore Wind Energy Cost Modeling Installation and Decommissioning

    CERN Document Server

    Kaiser, Mark J

    2012-01-01

    Offshore wind energy is one of the most promising and fastest growing alternative energy sources in the world. Offshore Wind Energy Cost Modeling provides a methodological framework to assess installation and decommissioning costs, and using examples from the European experience, provides a broad review of existing processes and systems used in the offshore wind industry. Offshore Wind Energy Cost Modeling provides a step-by-step guide to modeling costs over four sections. These sections cover: ·Background and introductory material, ·Installation processes and vessel requirements, ·Installation cost estimation, and ·Decommissioning methods and cost estimation.  This self-contained and detailed treatment of the key principles in offshore wind development is supported throughout by visual aids and data tables. Offshore Wind Energy Cost Modeling is a key resource for anyone interested in the offshore wind industry, particularly those interested in the technical and economic aspects of installation and decom...

  3. Installed capacity in New York

    International Nuclear Information System (INIS)

    Charlton, J.

    2006-01-01

    This presentation discussed capacity issues related to the New York Independent System Operator (NYISO). The NYISO's market volume was approximately $11 billion in 2005, and it was responsible for providing 32,075 MW of electricity at peak load to its users. Regulatory uncertainty is currently discouraging investment in new generating resources. All load serving entities are required to contract for sufficient capacity in order to meet their capacity obligations. Market participants currently determine capacity and energy revenues. The NYISO market allows suppliers to recover variable costs for providing ancillary services, and the economic value of the revenue source governs decisions made in the wholesale electricity market. The installed capacity market was designed as a spot auction deficiency auction. Phased-in demand curves are used to modify the installed capacity market's design. A sloped demand curve mechanism is used to value capacity above the minimum requirement for both reliability and competition. Participation in the day-ahead market enhances competition and exerts downward pressure on energy and ancillary service market prices. It was concluded that the market structures and design features of the installed capacity markets recognize the need for system reliability in addition to encouraging robust competition and recognizing energy price caps and regulatory oversights. tabs., figs

  4. Installation of foundation fieldbus to KUR

    International Nuclear Information System (INIS)

    Ishihara, Shinji; Fujita, Yoshiaki

    1999-11-01

    The instrumentation and control system for the research reactor in Research Reactor Institute, Kyoto University has been used for the safe and steady operation since the initial critical attainment in 1964. It has been modified and added many devices in the chance of increasing the reactor power from 1 MW to 5 MW, installing new experimental facilities or fitting to modified nuclear regulations. In order to avoid the unscheduled shutdown of the research reactor by cause the failure of the devices, most of instrumentation system was renewed in 1999. Operating the research reactor more safely and reliably, Supervisory Control Automation and Data Acquisition System which employed personal computers with the Windows NT operating system was added to the conventional instrumentation system, and the fieldbus system called Foundation Fieldbus was installed. Compared with conventional instrumentation system, each fieldbus system has some advantages. Many kinds of fieldbus systems have been developed and sold on the markets in some countries. Foundation Fieldbus standardizing international, which was able to use the devices made by multi-vendor was tentatively installed to study particular techniques about Foundation Fieldbus. The primary coolant flow rate, the temperature difference between the reactor tank inlet and outlet temperatures, the calorimetric power and the reactor power in nuclear instrumentation are monitored on human-machine interface devices on the fieldbus. The programmable logic controller is employed to control the information system for the reactor. This paper introduces Foundation Fieldbus installed. (author)

  5. Decommissioning and abandonment of offshore installations

    International Nuclear Information System (INIS)

    Side, J.C.

    1992-01-01

    To the onlooker surprising little thought was given at the project planning stage to the fate of offshore facilities once their production lifetimes had come to an end. Throughout the 1970s at least, international law required the complete removal of all structures and installations one disused or abandoned. Fishermen's organisations were led to believe that such installations would be entirely removed yet many of the designs of these show that removal was not much in the minds of the engineers or project management during the design stages. Changes in the text of the United Nations' Convention on the Law of the Sea and (by their widespread legal adoption) in customary international law may now permit partial removal of installations subject to important safeguards for navigation, the environment and other users of the sea. Of the North Sea states at least one has adopted policies that will minimise the cost associated with offshore decommissioning and abandonment and both the UK and Norway are adopting legislation which will provide for a case by case approach to the decommissioning and abandonment of offshore facilities and allow partial removal options. There has thus been a recent and significant change in approach to the abandonment of offshore oil and gas installations. This chapter reviews the development of abandonment laws and policies, outlines the available removal options, and provides a consideration of the environmental and fishery implications of these for the North Sea. (Author)

  6. Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Kolpa, R.; Smith, K.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard property located on Hunter Army Airfield (HAA) near Savannah, Georgia, known as Army Aviation Support Facility (AASF) No. 3. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, types and quantities of hazardous substances utilized, the nature and amounts of wastes generated or stored at the facility, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the AASF No. 3 property, requirements of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities and past activities contained within the area now occupied by AASF No. 3. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of HAA completed in 1992 (USATHAMA 1992) and to provide comprehensive information on AASF No. 3 for incorporation with information contained in that previous assessment for the entirety of HAA.

  7. Y2K bug and nuclear installations; Le passage a l'an 2000 sur les installations nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    1999-10-01

    Most nuclear installations except power plants, will be shut down on the eve of new year. By september 1999, EDF will have realized all the corrective and preventive actions that are necessary to pass Y2K. CEA has committed to present to safety authorities a complete report concerning preventive actions in its own basic nuclear installations. Safety authorities plan to organize a crisis center in order to face any problem. (A.C.)

  8. The installation and dismantling of electrolytic cells

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to construction of aluminium electrolytic cells, their installation and dismantling. Therefore, the general characteristic and classification of aluminium electrolytic cells was considered. The anode and cathode structure was studied. The lining of cathode casing, the process of collection of anode gases, electrolytic cell cover, and electrical insulation was studied as well. The installation and dismantling of aluminium electrolytic cells was described.

  9. 30 CFR 77.509 - Transformers; installation and guarding.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a... feet from any energized parts, casings, or wiring. (b) Transformer stations shall be enclosed to...

  10. 47 CFR 80.903 - Inspection of radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... ship passes the inspection, the technician will issue a Communications Act Safety Radiotelephony... 47 Telecommunication 5 2010-10-01 2010-10-01 false Inspection of radiotelephone installation. 80... Passenger Boats § 80.903 Inspection of radiotelephone installation. Every vessel subject to Part III of...

  11. Construction of a differential thermal analysis installation; Realisation d'une installation d'analyse thermique differentielle

    Energy Technology Data Exchange (ETDEWEB)

    Branche, G; Chantret, F [Commissariat a l' Energie Atomique, Saclay (France).Centre d' Etudes Nucleaires

    1959-07-01

    The authors are indicating the characteristics of a D.T.A. installation they built. Experimental rooms, ovens, thermal regulation, recording methods are thoroughly described, with outlining of the requirements to obtain a high sensitivity. Numerous D.T.A. curves relating to argillaceous substances, bituminous shales, and uraniferous compounds are given. (author) [French] Les auteurs donnent les caracteristiques de l'installation d'Analyse Thermique Differentielle qu'ils ont construits. Ils decrivent en detail les chambres d'experiences, les fours, la regulation thermique, l'enregistrement, en insistant sur les conditions necessaires pour obtenir une sensibilite elevee. Ils donnent de nombreuses courbes differentielles relatives des produits argileux, des schistes bitumineux et des composes uraniferes. (auteur)

  12. 30 CFR 57.4131 - Surface fan installations and mine openings.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface fan installations and mine openings. 57... Fire Prevention and Control Prohibitions/precautions/housekeeping § 57.4131 Surface fan installations... stored within 100 feet of mine openings or within 100 feet of fan installations used for underground...

  13. RADAR 2020. Outline of important future developments for installation businesses

    International Nuclear Information System (INIS)

    Pleijster, F.; Braaksma, R.; Van Hoorik, P.; Pikaart, A.; Zwinkels, A.; Muizer, A.

    2010-11-01

    This RADAR focuses on future trends in the broad field of the installation industry with the aim of developing supporting policy for the installation businesses based on the objectives of UNETO-NVO and OTIB. Trends that can be earmarked as relevant for the installation industry are: Social development, Economic development, Technological development, Organizational development, Economic development, and Political development. In this framework, attention is mainly paid to the developments in the following working areas of the installation industry: Climate Engineering, Electrical Engineering, Sanitary engineering, and ICT. [nl

  14. Installation Strategy for the LHC Main Dipoles

    CERN Multimedia

    Fartoukh, Stephane David

    2004-01-01

    All positions in the LHC machine are not equivalent in terms of beam requirements on the geometry and the field quality of the main dipoles. In the presence of slightly or strongly out-of tolerance magnets, a well-defined installation strategy will therefore contribute to preserve or even optimize the performance of the machine. Based on the present status of the production, we have anticipated a list of potential issues (geometry, transfer function, field direction and random b3) which, combined by order of priority, have been taken into account to define a simple but efficient installation algorithm for the LHC main dipoles. Its output is a prescription for installing the available dipoles in sequence while reducing to an absolute minimum the number of holes required by geometry or FQ issues.

  15. IPPC installations in France and limit values of emission

    International Nuclear Information System (INIS)

    Soleille, S.

    2004-05-01

    The IPPC directive of the 24 September 1996 asked for the main european industrial installations an authorization. This authorization fixes limit values for pollutant emissions. In France, the main industrial installations are controlled since many years in the framework of the regulation on classified installations for the environment protection (ICPE). This report compares the limit values of emissions for the national and prefectorial orders and for the IPPC directive. (A.L.B.)

  16. The dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Lacoste, A.C.; Duthe, M.; Mignon, H.; Lambert, F.; Pradel, Ph.; Hillewaere, J.P.; Dupre la Tour, St.; Mandil, C.; Weil, L.; Eickelpasch, N.; Finsterwalder, L.

    1997-01-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of 'Controle'to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  17. The nuclear installations face to their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October fifteenth 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (author)

  18. DOD low energy model installation program

    International Nuclear Information System (INIS)

    Fournier, D.F. Jr.

    1993-01-01

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DoD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DoD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies. A military installation is in reality a small to medium sized city. It generally has a complete utilities infrastructure including water supply and distribution, sewage collection and treatment, electrical supply and distribution, central heating and cooling plants with thermal distribution, and a natural gas distribution system. These utilities are quite extensive and actually consume about 10-15% of the energy on the facility not counting the energy going into the central plants

  19. Some suggestions based on the instrumentation installation experience at RAPP

    International Nuclear Information System (INIS)

    Raghunath, M.R.; Singh, S.; Jain, V.K.

    1977-01-01

    Suggestions regarding installation of reactor instrumentation have been made based on the instrumentation installation experience at the Rajasthan Atomic Power Plant. It has been mentioned that the instrumentation installation work has to proceed simultaneously with that of the heavy equipment and piping errection work, to meet the commissioning target dates. (S.K.K.)

  20. Advanced Measuring (Instrumentation Methods for Nuclear Installations: A Review

    Directory of Open Access Journals (Sweden)

    Wang Qiu-kuan

    2012-01-01

    Full Text Available The nuclear technology has been widely used in the world. The research of measurement in nuclear installations involves many aspects, such as nuclear reactors, nuclear fuel cycle, safety and security, nuclear accident, after action, analysis, and environmental applications. In last decades, many advanced measuring devices and techniques have been widely applied in nuclear installations. This paper mainly introduces the development of the measuring (instrumentation methods for nuclear installations and the applications of these instruments and methods.

  1. Technique for Determination of Rational Boundaries in Combining Construction and Installation Processes Based on Quantitative Estimation of Technological Connections

    Science.gov (United States)

    Gusev, E. V.; Mukhametzyanov, Z. R.; Razyapov, R. V.

    2017-11-01

    The problems of the existing methods for the determination of combining and technologically interlinked construction processes and activities are considered under the modern construction conditions of various facilities. The necessity to identify common parameters that characterize the interaction nature of all the technology-related construction and installation processes and activities is shown. The research of the technologies of construction and installation processes for buildings and structures with the goal of determining a common parameter for evaluating the relationship between technologically interconnected processes and construction works are conducted. The result of this research was to identify the quantitative evaluation of interaction construction and installation processes and activities in a minimum technologically necessary volume of the previous process allowing one to plan and organize the execution of a subsequent technologically interconnected process. The quantitative evaluation is used as the basis for the calculation of the optimum range of the combination of processes and activities. The calculation method is based on the use of the graph theory. The authors applied a generic characterization parameter to reveal the technological links between construction and installation processes, and the proposed technique has adaptive properties which are key for wide use in organizational decisions forming. The article provides a written practical significance of the developed technique.

  2. Optimal installation program for reprocessing plants

    International Nuclear Information System (INIS)

    Kubokawa, Toshihiko; Kiyose, Ryohei

    1976-01-01

    Optimization of the program of installation of reprocessing plants is mathematically formulated as problem of mixed integer programming, which is numerically solved by the branch-and-bound method. A new concept of quasi-penalty is used to obviate the difficulties associated with dual degeneracy. The finiteness of the useful life of the plant is also taken into consideration. It is shown that an analogous formulation is possible for the cases in which the demand forecasts and expected plant lives cannot be predicted with certainty. The scale of the problem is found to have kN binary variables, (k+2)N continuous variables, and (k+3)N constraint conditions, where k is the number of intervals used in the piece-wise linear approximation of a nonlinear objective function, and N the overall duration of the period covered by the installation program. Calculations are made for N=24 yr and k=3, with the assumption that the plant life is 15 yr, the plant scale factor 0.5, and the maximum plant capacity 900 (t/yr). The results are calculated and discussed for four different demand forecasts. The difference of net profit between optimal and non-optimal installation programs is found to be in the range of 50 -- 100 M$. The pay-off matrix is calculated, and the optimal choice of action when the demand cannot be forecast with certainty is determined by applying Bayes' theory. The optimal installation program under such conditions of uncertainty is obtained also with a stochastic mixed integer programming model. (auth.)

  3. The dismantling of CEA nuclear installations

    International Nuclear Information System (INIS)

    Piketty, Laurence

    2016-03-01

    After having indicated locations of French nuclear installations which are currently being dismantled (about 30 installations), and recalled the different categories of radioactive wastes with respect to their activity level and the associated storage options, this article gives an overview of various aspects of dismantling, more precisely in the case of installations owned and managed by the CEA. These operations comprise the dismantling itself, the recovery and packaging of wastes, old effluents and spent fuels. The organisation and responsible departments within the CEA are presented, and the author outlines some operational problematic issues met due to the age of installations (traceability of activities, regulation evolutions). The issue of financing is then discussed, and its uncertainties are outlined. The dismantling strategy within the CEA-DEN is described, with reference to legal and regulatory frameworks. The next parts of the article address the organisation and the economic impact of these decontamination and dismantling activities within the CEA-DEN, highlight how R and D and advanced technology are a support to this activities as R and D actions address all scientific and technical fields of nuclear decontamination and dismantling. An overview of three important dismantling works is proposed: Fontenay-aux-Roses, the Marcoule CEA centre (a reference centre in the field of nuclear dismantling and decontamination) and the Grenoble CEA centre (reconversion in R and D activities in the fields of technologies of information, of communication, technologies, for health, and in renewable energies). The last part addresses the participation to the Strategic Committee of the Nuclear Sector (CSFN)

  4. Design and installation package for a solar powered pump

    Science.gov (United States)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  5. 46 CFR 76.27-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  6. Listed installations for environmental protection in hospitals

    International Nuclear Information System (INIS)

    Mullot, J.U.; Chaulet, J.F.; Thual, A.; Lafon, M.

    1999-01-01

    This work deals with the implications of different French rules and regulations concerning the environmental protection in hospitals. A special place is given to listed installations for environmental protection, because of their importance. A summary of important regulatory texts is presented concerning these installations, and also an inventory of installations or activities concerned, and the definition of the necessary procedures. Some ideas are also given about the much needed creation of an 'environmental network' inside hospitals, in order to cope with these concerns. Then, we briefly deal with more recent developments concerning the environmental protection, which will, no doubt, extend to hospitals, such as the French water law, air law, and procedures for the management of medical waste. Finally, the stakes of environmental decisions in hospitals and the chemist's place in these decisions are debated. (authors)

  7. Leukaemia near british nuclear installations

    International Nuclear Information System (INIS)

    Hubert, D.

    1991-01-01

    An excess of childhood leukaemia has been seen near some British nuclear installations, especially near the Sellafield reprocessing plant. The same result was found in a more general study including a large number of nuclear sites. Similar studies made in USA, Canada and France have been negative. Moreover, epidemiological studies made in England have discovered other childhood leukaemia clusters in areas far from nuclear facilities, and especially near potential sites of nuclear installations. Several explanations are suggested but no definite conclusion is yet possible. Doses from radioactive releases seem to be too low to account for the additional deaths from leukaemia by environmental contamination. A virus activation, which might be associated with population influx into rural isolated areas, has been considered. The hypothesis of genetic mutation induced by ionising radiation in the fathers of children with leukaemia has been made because a higher risk of leukaemia was observed for children of fathers employed at Sellafield. No firm conclusion is possible considering the small number of observed cases and the lack of excess leukaemias in the offspring of Hiroshima and Nagasaki survivors. The possibility of internal contamination, chemicals or even radon is discussed as other causes. Studies in progress might allow to find an answer to the problem of leukaemia in the vicinity of British nuclear installations [fr

  8. Nuclear Installations Act 1969

    International Nuclear Information System (INIS)

    1969-01-01

    The purpose of this Act is to amend the Nuclear Installations Act 1965 to bring it into full compliance with the international conventions on nuclear third party liability to which the United Kingdom is a Signatory, namely, the Paris Convention, the Brussels Supplementary Convention and the Vienna Convention. (NEA) [fr

  9. Questions for the nuclear installations inspectorate

    International Nuclear Information System (INIS)

    Conroy, C.; Flood, M.; MacRory, R.; Patterson, W.C.

    1976-01-01

    The responsibilities of the Nuclear Installations Inspectorate are considered, and the responsibilities of other bodies for (a) reprocessing and enrichment, and (b) security. Questions for the Nuclear Installations Inspectorate are then set out under the following heads: general (on such topics as vandalism, sabotage, threats, security, reactor incidents); magnox reactors; corrosion; advanced gas-cooled reactor; steam generating heavy water reactor; fast breeder reactor; reproces-sing and waste. Most of the questions are concerned with technical problems that have been reported or might possibly arise during construction or operation, affecting the safety of the reactor or process. (U.K.)

  10. First DT+RPC chambers installation round in the UX5 cavern

    CERN Multimedia

    Jesus Puerta-Pelayo

    2007-01-01

    DT+RPC packages corresponding to sectors 1 and 7 of the barrel region cannot be installed on surface, since the lowering gantry from SX5 to UX5 uses their gaps to hold the wheels. Therefore this installation has to be carried out in the cavern. These pictures illustrate the first installation round on YB+2 right after the lowering. A total of 8 chambers were successfully installed in 2 days.

  11. Professional installation of overvoltage protection devices. The most common installation errors; Fachgerechte Installation von Ueberspannungsschutzgeraeten. Die haeufigsten Installationsfehler

    Energy Technology Data Exchange (ETDEWEB)

    Gmelch, L. [Dehn und Soehne GmbH und Co. KG, Neumarkt (Germany)

    2007-07-01

    Increasingly sensitive electronic equipment and high demands on plant and system availability necesstate effective protection against lightning and overvoltage. Apart from the measures that must be taken already in the projecting phase in order to minimize the risk of interferences, disturbances and destruction of plants and systems, there are also some basic principles that must be observed when installing overvoltage protection equipment. If these are neglected, the protective function of overvoltage protection systems may be seriously impaired. (orig.)

  12. 46 CFR 76.35-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.35-15 Section 76.35-15... EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  13. 46 CFR 76.25-35 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.25-35 Section 76.25-35... EQUIPMENT Automatic Sprinkling System, Details § 76.25-35 Operation and installation. (a) The system shall... all its components shall be used for no other purpose. (h) All wiring and electrical circuits and...

  14. 46 CFR 76.30-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.30-15 Section 76.30-15... EQUIPMENT Pneumatic Fire Detecting System, Details § 76.30-15 Operation and installation. (a) The system... that it may be incorporated with the manual alarm system. (e) All wiring and electrical circuits and...

  15. 46 CFR 182.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust pipe... equipment might come in contact with an exhaust pipe. (b) Exhaust gas must not leak from the piping or any...

  16. Installation of a second superconducting wiggler at SAGA-LS

    Energy Technology Data Exchange (ETDEWEB)

    Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.; Koda, S. [SAGA Light Source, 8-7 Yayoigaoka, Tosu 841-0005 (Japan)

    2016-07-27

    The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of the vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.

  17. Impact of size and distribution of installed PV power in E-W direction on the level in which selected consumers’ energy needs were met

    OpenAIRE

    Necka Krzysztof; Latala Hubert; Kurpaska Sławomir; Knaga Jarosław; Karbowniczakʼ Anna

    2018-01-01

    The aim of the study was to analyse the energy needs of selected consumers and to select the PV installed capacity in the east and west panels orientation (E-W). The analysis was carried out for two variants. The first concerned the impact of the installation power of a PV source on the contracted power in its symmetric east and west position. The second variant was the result of previous observations and studies of the authors of this paper. Thus, in this variant, the unbalanced power of PV ...

  18. Physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Toepfer, K.

    1989-01-01

    This contribution investigates the possible danger and the legal basis of physical protection and explains the current, integrated system provided for, as well as the underlying possible scenarios of an assault: (1) by a violent crowd of aggressors outside the installation, (2) by a small group of aggressors outside the installation, (3) by a person allowed to enter (internal assault). The physical protection system supplements the internal safety measures to enhance protection against hypothetical and possible acts of terrorism or other criminal assault. The system covers external and internal controlled areas, access monitoring, physical protection control room and service, security checks of the personnel, and activities to disclose sabotage. Some reflections on the problem field between security controls and the constitutional state conclude this contribution. (orig./HSCH) [de

  19. Installation package for a sunspot cascade solar water heating system

    Science.gov (United States)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  20. Keeping the Future Bright: Department of Defense (DOD) Sustainable Energy Strategy for Installations

    Science.gov (United States)

    2016-04-04

    still slightly more expensive to install than utility-scale PV, distributed solar installation costs decreased in half since 2008, and this power source...has been privately purchased and installed . However, utility companies are beginning to purchase and install solar panel systems on homes and...front installation and hardware costs. This new initiative accounted for more than 72 % of U.S. residential solar installations in 2Ol4. Over the past

  1. Laser ionization installation for measurement of atomic beam parameters

    CERN Document Server

    Tukhlibaev, O; Khalilov, E E; Alimov, U Z

    2002-01-01

    The design of the laser ionization installation for determination of the atomic beam intensity, density and spatial structure is described. The method of the atoms laser resonance staged photoionization is applied in the installation. The above installation consists of two lasers on the dyestuffs, the atomizer, the ionization system and the ion signals registration system. The results of studies on the spatial structure of the In atoms beam are presented. The proposed method provides for the spatial resolution at the level of 10-100 mu m

  2. Volcanic Hazards in Site Evaluation for Nuclear Installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-10-15

    This publication provides comprehensive and updated guidance for site evaluation in relation to volcanic hazards. It includes recommendations on assessing the volcanic hazards at a nuclear installation site, in order to identify and characterize, in a comprehensive manner, all potentially hazardous phenomena that may be associated with future volcanic events. It describes how some of these volcanic phenomena may affect the acceptability of the selected site, resulting in exclusion of a site or determining the corresponding design basis parameters for the installation. This Safety Guide is applicable to both existing and new sites, and a graded approach is recommended to cater for all types of nuclear installations. Contents: 1. Introduction; 2. Overview of volcanic hazard assessment; 3. General recommendations; 4. Necessary information and investigations (database); 5. Screening of volcanic hazards; 6. Site specific volcanic hazard assessment; 7. Nuclear installations other than nuclear power plants; 8. Monitoring and preparation for response; 9. Management system for volcanic hazard assessment; Annex I: Volcanic hazard scenarios; Annex II: Worldwide sources of information.

  3. Safety requirements and radiological protection for ore installations

    International Nuclear Information System (INIS)

    2003-06-01

    This norm establishes the safety and radiological protection requirements for mining installations which manipulates, process and storing ores, raw materials, steriles, slags and wastes containing radionuclides of the uranium and thorium natural series, simultaneously or separated, and which can cause undue exposures to the public and workers, at anytime of the functioning or pos operational stage. This norm applies to the mining installations activities, suspended or which have ceased their activities before the issue date of this norm, destined to the mining, physical, chemical and metallurgical processing, and the industrialization of raw materials and residues containing associated radionuclides from the natural series of uranium and thorium, including the stages of implantation, operation and decommissioning of the installation

  4. A method of installing a reactor container

    International Nuclear Information System (INIS)

    Hayashi, Kenji; Murakawa, Hisao.

    1975-01-01

    Object: To achieve exact installation of a reactor container at a site. Structure: A pole is set upright at the center of a cylindrical base portion, a plurality of beams are disposed around the pole in a radial fashion to form a cone, a plurality of steel plates are mounted successively around the cone through a ring, and the steel plates are welded to each other to assemble and install a reactor container at the same time. (Kamimura, M.)

  5. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  6. Study on installation of the submersible mixer

    International Nuclear Information System (INIS)

    Tian, F; Shi, W D; He, X H; Xu, Y H; Jiang, H

    2013-01-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice

  7. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  8. The Swiss nuclear installations. Annual report 1993

    International Nuclear Information System (INIS)

    1994-08-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration of final disposal facilities for radwaste and the interim radwaste storage facilities in Switzerland. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1993, is judged as good by HSK. (author) 10 figs., 11 tabs

  9. The Swiss nuclear installations. Annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs.

  10. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    Science.gov (United States)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  11. Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to the book “Guidelines for Building a Private Cloud Infrastructure”. This document provides guidance on how to install Ubuntu Enterprise Cloud in virtual environment, and afterwards how to scale out when needed. The purpose of this supplemental book...... is to provide a practical, step-by-step, detailed guide on how to dimension and install the machines and network. Some initial steps of configuring the cloud are also covered. The installation is performed in a virtual environment based on Windows 7 and VMware Workstation 7. The cloud installation is performed...... cloud, both using the command line tools, and GUI based tool HybridFox....

  12. Improved gas installations and services. Phase 1: Analysis project. Part report

    International Nuclear Information System (INIS)

    Nielsen, K.J.

    1996-05-01

    As Danish gas companies receive a large number of complaints related to the installation and operation of gas installations it was suggested that a course for personnel should be established in order to raise the standard of services and installation requirements. The first phase of the described project was to evaluate the quality of the gas installers' services so as to determine which aspects of installation and services should be emphasized during such a course. Interviews were carried out and questionnaires (illustrated within the document) sent out to installaters etc. Recommendations include that the level of information given to customers should be raised, also in relation to maintenance, and that installation should be improved. Analyses of the degree of customers' satisfaction, of the nature of the quality of services etc. expected, subjects for further training in this area and details of the training system are dealt with

  13. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    CERN Document Server

    De Salvo, Alessandro; The ATLAS collaboration; Sanchez, Arturo; Smirnov, Yuri

    2015-01-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  14. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  15. Using the Spatial Distribution of Installers to Define Solar Photovoltaic Markets

    Energy Technology Data Exchange (ETDEWEB)

    O' Shaughnessy, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Nemet, Gregory F. [Univ. of Wisconsin, Madison, WI (United States); Darghouth, Naim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-09-01

    Solar PV market research to date has largely relied on arbitrary jurisdictional boundaries, such as counties, to study solar PV market dynamics. This paper seeks to improve solar PV market research by developing a methodology to define solar PV markets. The methodology is based on the spatial distribution of solar PV installers. An algorithm is developed and applied to a rich dataset of solar PV installations to study the outcomes of the installer-based market definitions. The installer-based approach exhibits several desirable properties. Specifically, the higher market granularity of the installer-based approach will allow future PV market research to study the relationship between market dynamics and pricing with more precision.

  16. Managing for safety at nuclear installations

    International Nuclear Information System (INIS)

    1996-01-01

    This publication, by the Health and Safety Executive's (HSE's) Nuclear Safety Division (NSD), provides a statement of the criteria the Nuclear Installations Inspectorate (NII) uses to judge the adequacy of any proposed or existing system for managing a nuclear installation in so far as it affects safety. These criteria have been developed from the basic HSE model, described in the publication Successful health and safety management that applies to industry generally, in order to meet the additional needs for managing nuclear safety. In addition, the publication identifies earlier studies upon which this work was based together with the key management activities and outputs. (Author)

  17. Natural gas fuelling stations installation code

    Energy Technology Data Exchange (ETDEWEB)

    Barrigar, C; Burford, G; Adragna, M; Hawryn, S

    2004-07-01

    This Canadian Standard applies to natural gas fuelling stations that can be used for fleet and public dispensing operations. This document is divided into 11 sections that address the scope of the Standard; definitions and reference publications; general requirements; compressors; storage; dispensing; flow control devices; storage vessel dispatch and receiving; design, installation and testing of piping, tubing and fittings; and installation of vehicle refuelling appliances (VRAs) connected to storage piping. The most recent revision to the Standard includes requirements for indoor fuelling of natural gas vehicles. This Standard, like all Canadian Standards, was subject to periodic review and was most recently reaffirmed in 2004. tabs., figs.

  18. Poultry farming buildings. Natural gas heating. Guidebook of installation rules; Batiments d`elevage avicole. Chauffage au gaz. Guide des regles d`installation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The technical and economical performances of a poultry farm are greatly influenced by the mastery of ambient temperature during the first days of husbandry. The natural gas space heating installation must answer these requirements and also respect all safety rules concerning the personnel and the animals. In order to answer the questions of poultry farming professionals, the technical association of the natural gas industry (ATG) in France and the Groupama insurance company have redefined the new version of this brochure which integrates the recent technological advances and defines the minimum quality and safety rules required to achieve a natural gas heating installation. The different topics presented are: the gas supply (aerial fixed reservoirs), the general distribution panel (location, command systems, regulation systems for LPG installations, electrical equipments), the distribution pipes (general supply, indoor pipes, flexible pipes, pipe fittings), the heating systems (power, choice, power supply, fastening, air renewal), the check and sign and the start-up of the installation, the periodical control and maintenance operations. (J.S.)

  19. Nuclear installations abroad the accident risks and their potential consequences

    Energy Technology Data Exchange (ETDEWEB)

    Turvey, F J [Radiological Protection Inst. of Ireland (Ireland)

    1996-10-01

    This paper endeavors to assess the threat to Ireland from severe accidents at civil nuclear installations. Among the various types of nuclear installations worldwide, reactors and reprocessing plants are considered to be the most threatening and so the paper focuses on these. The threat is assumed to be a function of the risk of severe accidents at the above types of installations and the probability of unfavourable weather conditions carrying the radioactive releases to Ireland. Although nuclear installations designed in eastern Europe and Asia are less safe than others, the greatest threat to Ireland arises from nearby installations in the UK. The difficulty of measuring the probabilities and consequences of severe nuclear accidents at nuclear installations in general is explained. In the case of the UK installations, this difficulty is overcome to some degree by using values of `tolerable` risk adopted by the national nuclear regulator to define the radiotoxic releases from nuclear accidents. These are used as input to atmospheric dispersion models in which unfavourable weather conditions for Ireland are assumed and radiation doses are calculated to members of the Irish public. No countermeasures, such as sheltering, are assumed. In the worst cast scenario no deaths would be expected in Ireland in the immediate aftermath of the accident however, an increase in cancers over a period of 25 years or so would be expected assuming present-day models for the effect of low level radiation are valid.

  20. Nuclear installations abroad the accident risks and their potential consequences

    International Nuclear Information System (INIS)

    Turvey, F.J.

    1996-01-01

    This paper endeavors to assess the threat to Ireland from severe accidents at civil nuclear installations. Among the various types of nuclear installations worldwide, reactors and reprocessing plants are considered to be the most threatening and so the paper focuses on these. The threat is assumed to be a function of the risk of severe accidents at the above types of installations and the probability of unfavourable weather conditions carrying the radioactive releases to Ireland. Although nuclear installations designed in eastern Europe and Asia are less safe than others, the greatest threat to Ireland arises from nearby installations in the UK. The difficulty of measuring the probabilities and consequences of severe nuclear accidents at nuclear installations in general is explained. In the case of the UK installations, this difficulty is overcome to some degree by using values of 'tolerable' risk adopted by the national nuclear regulator to define the radiotoxic releases from nuclear accidents. These are used as input to atmospheric dispersion models in which unfavourable weather conditions for Ireland are assumed and radiation doses are calculated to members of the Irish public. No countermeasures, such as sheltering, are assumed. In the worst cast scenario no deaths would be expected in Ireland in the immediate aftermath of the accident however, an increase in cancers over a period of 25 years or so would be expected assuming present-day models for the effect of low level radiation are valid

  1. Installation and experimental uses of RTNS-I at the University of California, Berkeley

    International Nuclear Information System (INIS)

    Belian, A.P.; Morse, E.C.; Tobin, M.

    1996-01-01

    The National Ignition Facility (NIF) features optical components with line-of-sight access to the 14 MeV neutrons generated by fusion reactions in the target. Two of these components are a final focusing lens, made of fused silica, and a frequency conversion crystal comprised of two potassium dihydrogen phosphate (KDP) crystals. The Rotating Target Neutron Source (RTNS-I), which was previously operated at Lawrence Livermore National Laboratory (LLNL), has now been re-installed at UC Berkeley and is being used for the studies of neutron irradiation of fused silica and KDP. The machine has been installed so as to re-utilize the concrete structure that once housed the Berkeley Research Reactor, now decommissioned. The RTNS uses a 2 - 5 mA beam of deuterons impinging upon a spinning internally cooled tritiated copper target with a 110 Ci tritium inventory. Maximum beam energy is 399 KeV. The 14 MeV neutron production rate is 1.0x10 12 n/sec. Some new features of the machine include fiber-optic coupled microprocessor control of accelerator parameters, a cryogenic tritium collection system, and a scrubber system for exhaust tritium management. 15 refs., 4 figs

  2. Installation of the Gbar LINAC

    CERN Multimedia

    Maximilien, Brice

    2017-01-01

    Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

  3. Environmental assessment [of nuclear installations

    International Nuclear Information System (INIS)

    Townsley, M.

    1989-01-01

    The European Community has introduced a directive which instructs that for all projects likely to have a significant effect on the environment consent should only be given after a rigorous assessment of such effects has been carried out and presented as an environmental statement. Projects requiring environmental assessment include nuclear power stations, any thermal power station over 300MW, any radioactive waste storage or disposal facility, any installation which produces electricity, power lines, installations for fuel production, fuel reprocessing, radioactive waste processing and fuel enrichment. The statement must include a description of the likely effects, direct and indirect, on the environment of the development, with reference to human beings, flora, fauna, soil, water, air, climate, landscape, interactions of two or more of these, material assets and cultural heritage. Measures to avoid or remedy the impact must be included. (U.K.)

  4. Bridging interpersonal installation art with tangible business modeling

    DEFF Research Database (Denmark)

    Mitchell, Robb

    2012-01-01

    This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction.......This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction....

  5. Childhood cancer and nuclear installations: a review

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1998-01-01

    Many epidemiological studies of childhood cancer around nuclear installations have been conducted in recent years. This article reviews results from Great Britain and elsewhere. Geographical studies have indicated raised risks of childhood leukaemia around some British nuclear installations. However, environmental assessments suggest that the findings are unlikely to be due to radioactive releases from the sites. Case-control studies have allowed more detailed investigation of putative risk factors than is possible from geographical studies. In particular, a recent national study in Britain does not support the hypothesis raised by an earlier study in West Cumbria that paternal radiation exposure prior to conception may increase the risk of leukaemia and non-Hodgkin's lymphoma in offspring. Other studies suggest that childhood leukaemia may have an infective basis, although there is still uncertainty about whether this would explain the findings around nuclear installations. The UK Childhood Cancer Study may provide more information on the causes of these diseases. (author)

  6. Update on Geothermal Direct-Use Installations in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Beckers, Koenraad J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Snyder, Diana M. [Georgia State University

    2017-02-15

    Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.

  7. 49 CFR 192.359 - Customer meter installations: Operating pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meter installations: Operating pressure... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure...

  8. Rapid installation of numerical models in multiple parent codes

    Energy Technology Data Exchange (ETDEWEB)

    Brannon, R.M.; Wong, M.K.

    1996-10-01

    A set of``model interface guidelines``, called MIG, is offered as a means to more rapidly install numerical models (such as stress-strain laws) into any parent code (hydrocode, finite element code, etc.) without having to modify the model subroutines. The model developer (who creates the model package in compliance with the guidelines) specifies the model`s input and storage requirements in a standardized way. For portability, database management (such as saving user inputs and field variables) is handled by the parent code. To date, NUG has proved viable in beta installations of several diverse models in vectorized and parallel codes written in different computer languages. A NUG-compliant model can be installed in different codes without modifying the model`s subroutines. By maintaining one model for many codes, MIG facilitates code-to-code comparisons and reduces duplication of effort potentially reducing the cost of installing and sharing models.

  9. Decommissioning nuclear installations

    International Nuclear Information System (INIS)

    Dadoumont, J.

    2010-01-01

    When a nuclear installation is permanently shut down, it is crucial to completely dismantle and decontaminate it on account of radiological safety. The expertise that SCK-CEN has built up in the decommissioning operation of its own BR3 reactor is now available nationally and internationally. Last year SCK-CEN played an important role in the newly started dismantling and decontamination of the MOX plant (Mixed Oxide) of Belgonucleaire in Dessel, and the decommissioning of the university research reactor Thetis in Ghent.

  10. Order of 27 October 1971 on exemptions from classification as radioactive installations

    International Nuclear Information System (INIS)

    1971-01-01

    This Order was made in implementation of Section 2 of the 1964 Act on nuclear activities which provides that installations where the level of radiation produced entails no significant hazard shall be excluded from the classification of radioactive installations. Consequently, the Order specifies the activity thresholds for radionuclides below which installations containing them are not considered as radioactive installations. (NEA) [fr

  11. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  12. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2002-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2002 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2002. There are two installations mentioned in the statement: Dungeness B and Heysham 1. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  13. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meters and regulators: Installation. 192... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a...

  14. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  15. Installation for fatigue testing of materials at cryogenic temperatures

    International Nuclear Information System (INIS)

    Abushenkov, I.D.; Chernetskij, V.K.; Il'ichev, V.Ya.

    1986-01-01

    A new installation for mechanical fatigue tests of structural material samples is described, in which the possibility to conduct tests in the range of lower temperatures (4.2-300 K) is ensured. The installation permits to carry out fatigue tests using the method of axial loading of annular (up to 6 mm in diameter) and plane (up to 12 mm wide) samples during symmetric, asymmetric and pulsing loading cycles. It is shown that the installation suggested has quite extended operation possibilities and, coincidentally, it is characterized by design simplicity, compactness, comparatively low metal consumption and maintenance convenience

  16. Universal smoking installation of rotary type

    Directory of Open Access Journals (Sweden)

    Aminov V. A.

    2017-11-01

    Full Text Available According to the research carried out by the authors the most technological installations for producing meat and fish products are oriented only on one type of raw material (meat or fish, as well as the kind of smoking (cold or hot. Limitations are related to the maximum temperature of the drying agent that affects the product; presence of the system for maintaining the relative humidity of the air mixture; presence of the smoke cooling system coming from the smoke generator and a number of other factors. Enterprises expanding the range of products are forced to purchase new equipment. With a limited production area especially for small businesses this is not convenient. In the paper, a universal smoking installation of the rotor type (USIRT is considered for the production of both meat and fish products using cold or hot smoking. The installation is oriented to a wide range of products. The presence of the smoke cooling system will allow the production of cold smoking products, the presence of the dehumidification and humidification system for the smoke-air mixture will ensure the maintenance of the required technological regime for producing fish and meat products. Based on the example of cold smoking studies have shown that the duration of the process should be reduced while maintaining the quality of the product. For this purpose, ultrasonic (US vibrations have been applied to the smoke-air mixture in USIRT. The studies have been carried out to identify the best type of ultrasound radiators capable of transmitting vibrations of the installation metal surface and from it to pass into the smoke-air mixture in order to intensify the process of cold smoking. The necessary power of ultrasonic generators has been determined. Comparative results of technological processes with the application of ultrasound in the production of fish products have been presented.

  17. Parametric Design and Rapid Prototyping of Installation Box for Vehicle Terminal PCB

    Directory of Open Access Journals (Sweden)

    Wang Xingxing

    2016-01-01

    Full Text Available Installation box for vehicle terminal PCB (Printed Circuit Board was took as research object, which is encountered in the process of project developing. Vehicle terminal PCB in actual development process was set as an example, point cloud data were acquired by three coordinate measuring method; Imageware software was used to reconstruct the vehicle terminal PCB model, basic size parameters of vehicle terminal PCB can be got and then design parameters of installation box for vehicle terminal PCB can be determined. Design of the installation box for vehicle terminal PCB was completed based on Solidworks software, then 3D modeling and 2D drawing of installation box for vehicle terminal PCB was gained. Up Plus 2 rapid prototype machine was used to manufacture installation box for vehicle terminal PCB rapidly based on 3D printing technology, then prototype of installation box for vehicle terminal PCB was obtained. It is of certain engineering significant for single (small amount manufacturing of installation box for general PCB.

  18. Toroid field coil shear key installation study, DOE task No. 22

    International Nuclear Information System (INIS)

    Jones, C.E.; Meier, R.W.; Yuen, J.L.

    1995-01-01

    Concepts for fitting and installation of the scissor keys, triangular keys, and truss keys in the ITER Toroidal Field (TF) Coil Assembly were developed and evaluated. In addition, the process of remote removal and replacement of a failed TF coil was considered. Two concepts were addressed: central solenoid installed last (Naka Option 1) and central solenoid installed first (Naka Option 2). In addition, a third concept was developed which utilized the favorable features of both concepts. A time line for installation was estimated for the Naka Option 1 concept

  19. A recovery installation for sodium sulfates, thiosulfates and sulfides from waste water resulting from hydrogen sulfide fabrication

    International Nuclear Information System (INIS)

    Mazilu, Mihai; Costescu, Sanda

    2002-01-01

    An installation for recovery of sodium sulfate and sulfur suspensions from waste water was conceived. It consists from a preheater, vacuum evaporator and a refrigerating system with drum and scraper. This equipment concentration the solution by eliminating in the first stage the water in the vacuum evaporator. The water resulting at this stage is chemically pure and can be discharged in the sewage sludge system. The concentrated solution is then directed to the refrigerating system with drum and scrapper. Here the sodium sulfates, thiosulfates and sulfides get crystallized onto the drum surface. The resulting aqueous solution to be discharged in the sewage sludge system is previously analyzed as in case of the absent of the recovery installation, but the amount of pollutants will be much lower because sulfates, thiosulfates and sulfides were already recovered as scales from the drum. These solid scales can be used in detergent industry

  20. Installation for analytic chemistry under irradiation

    International Nuclear Information System (INIS)

    Fradin, J.; Azoeuf, P.; Guillon, A.

    1966-01-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [fr

  1. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  2. 32 CFR 643.121 - Private organizations on DA installations.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Private organizations on DA installations. 643.121 Section 643.121 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY... DA installations. (a) AR 210-1 defines and classifies private organizations, such as thrift shops and...

  3. Completion of installation of DT and RPC chambers before Cosmic Challenge

    CERN Multimedia

    Mimmo Dattola

    2006-01-01

    All the drift tube ("DT") and resistive plate chambers ("RPC") packages foreseen to be installed in the central barrel ring ("YB0") before the magnet test have been installed (some are missing in the photograph but have since been installed). These silver-coloured rectangular boxes in the gaps between the steel of the rings (red in the image) detect muons. Chambers for Sectors 4 and 5 (sector 1 is at the 9 o'clock position and the counting is clockwise) as well as a couple of chambers in the support "feet" (sectors 9 and 11) will be installed after the magnet test. Chambers for sectors 1 and 7 will be installed in the underground cavern ("UXC") - the latter will be in the places used for the lifting and lowering of the ring.

  4. Accuracy of computer-assisted cervicle pedicle screw installation

    International Nuclear Information System (INIS)

    Zhang Honglei; Zhou Dongsheng; Jang Zhensong

    2009-01-01

    Objective: To investigate the accuracy of computer-assisted cervical pedicle screw installation and the reason of screw malposition. Methods: A total of 172 cervical pedicle screws were installed by computer-assisted navigation for 30 patients with lower cervical spinal diseases. All the patients were examined by X-ray and CT after operation. Screw's position and direction were measured on the sagittal and transectional images of intraoperative navigation and post-operative CT. Then linear regression analysis was taken between navigational and post-operative CT's images. Results: Two screws perforated the upper pedicle wall, 3 perforated the lateral pedicle wall.There was a positive linear correlation between navigational and post-operative CT's images. Conclusion: Computer-assisted navigation can provide the high accuracy of cervical pedicle screw installation and excursion phenomenon is reason of screw malposition. (authors)

  5. The Management System for Nuclear Installations. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a) To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b) As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c) To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a) Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b) Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c) Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d) Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e) Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear

  6. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  7. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  8. Tolley's industrial and commercial gas installation practice

    CERN Document Server

    Hazlehurst, John

    2010-01-01

    This is the third of three essential reference volumes for those concerned with the installation and servicing of domestic and industrial gas equipment. This volume explains the basic principles underlying the practical and theoretical aspects of installing and servicing gas appliances and associated equipment, from the basics of combustion, to burners, pressure and flow, transfer of heat, controls, as well as materials and processes, electrical aspects, and metering and measuring devices. Covering both Natural Gas and Liquefied Petroleum Gas, the many illustrations and worked examples include

  9. Seal of quality for planners of geothermal energy installations, prize for geothermal installations; Guetesiegel fuer Planer von Geothermieanlagen, Geothermiepreis Phase I (2002)

    Energy Technology Data Exchange (ETDEWEB)

    Eugster, W. J. [Polydynamics Engineering Zuerich, Zuerich (Switzerland); Eberhard, M. [Eberhard and Partner AG, Aarau (Switzerland); Koschenz, M. [EMPA, Duebendorf (Switzerland); Morath, M. [Lippuner and Partner AG, Grabs (Switzerland); Rohner, E. [Engeo AG, Arnegg (Switzerland)

    2003-07-01

    This final report for the Swiss Federal Office for Energy describes a project that aimed to improve the awareness of planners and installers involved in geothermal energy projects for the problems encountered when dimensioning both large and small geothermal installations, and to provide the basic knowledge necessary for a correct sizing of such plants. The report's main emphasis is placed on three types of geothermal plant, bore-hole heat exchangers, groundwater use and energy pile installations. The concept of the training programme involved is described, which is to issue certificates and labels for the attainment of three levels of ability. These three levels (Labels A, B and C) cover simple, small plants for heating operation, medium sized plants within a heating capacity range of 30 to approximately 100 kW and large plants for heating and cooling operation with heat capacities greater than 100 kW, respectively. The report also includes details of the time-line aimed for and costs. Also, the idea of an annual prize for geothermal installations is briefly discussed.

  10. 40 CFR 1042.130 - Installation instructions for vessel manufacturers.

    Science.gov (United States)

    2010-07-01

    ...) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW AND IN-USE MARINE COMPRESSION-IGNITION ENGINES...-speed operation, tell vessel manufacturers not to install the engines in variable-speed applications or... vessel manufacturers. (a) If you sell an engine for someone else to install in a vessel, give the engine...

  11. 7 CFR 58.214 - General construction, repair and installation.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false General construction, repair and installation. 58.214... Service 1 Equipment and Utensils § 58.214 General construction, repair and installation. All equipment and utensils necessary to the manufacture of dry milk products, including pasteurizer, timing-pump or device...

  12. 14 CFR 171.9 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric... a power distribution system or locally generated, with a supplemental standby system, if needed. (c...

  13. Decommissioning of nuclear installations - regulations - financing - responsibility - insurance

    International Nuclear Information System (INIS)

    Hubert, E.H.; Andersson, C.; Deprimoz, J.; Mayoux, J.C.; Richard, M.; Sartorelli, C.; Nocera, F.

    1983-01-01

    This paper highlights three aspects of decommissioning of nuclear installations which relate, more or less directly, to legal options already applied or advocated. It reviews the regulatory conditions for decommissioning a nuclear installation and indicates legal provisions for financing decommissioning expenditures. It also describes the legal provisions to determine liabilities in case of nuclear damage and the assistance which insurers may provide to cover the consequences of such liabilities. (NEA) [fr

  14. Designing Software-Based Interactive Installations

    DEFF Research Database (Denmark)

    Andreasen, Troels; Juul, Niels Christian; Rosendahl, Mads

    2014-01-01

    of the installation using tools like sketching or storyboarding. The design involves a clarification of available and appropriate building blocks, as well as the linking of these blocks to provide an architectural framework comprising the intended external behavior. The construction phase takes a component...

  15. Development of a quality management system for Brazilian nuclear installations

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Zouain, Desiree Moraes

    2005-01-01

    The present work is a proposal for developing a quality management system for Brazilian nuclear installations, based on applicable standards. The standard ISO 9001:2000 [4] establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard IAEA 50-C/SG-Q [1] establishes general requirements for the implementation of a quality assurance system in nuclear installations. The standard CNEN-NN- 1.16 [5] establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The revision of standard IAEA 50-C/SG-Q [1], to be replaced by IAEA DS 338 [2] and IAEA DPP 349 [3], introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concept of 'Quality Assurance'. This approach is incorporated with the current tendency, because it guides the system to manage, in an integrated way, the requirements of quality, safety, health, environment, security and economics of the installation. The results of the characterization of the quality management systems established in the applicable standards are presented, with the determination of the common and conflicting points among them. Referring data to quality assurance program/quality management system in some nuclear installations of IAEA Member States are also presented. (author)

  16. Plutonium: resuspension of aerosols in nuclear installations: bibliographic survey; Le plutonium: mise en suspension d'aerosols dans les installations nucleaires: synthese bibliographique

    Energy Technology Data Exchange (ETDEWEB)

    Guetat, Ph; Monfort, M; Armand, P [CEA Bruyeres-le-Chatel, Dept. Analyse Surveillance Environnement, Service Radioanalyse Chimie Environnement, 91 (France); Alloul-Marmor, L [Societe APTUS, 78 - Versailles (France)

    2006-07-01

    This document presents an analysis and a bibliographical synthesis of the studies on resuspension factors for plutonium. It aims at helping the engineers of safety to specify the scenarios of accidents which relate to their activities and to bring elements justified for the definition of their term-source 'installation' in the safety reports of the installations. (authors)

  17. Nuclear installations safety in France. Compilation of regulatory guides

    International Nuclear Information System (INIS)

    1988-01-01

    General plan: 1. General organization of public officials. Procedures 1.1. Texts defining the general organization and the procedures 1.2. Interventing organisms; 2. Texts presenting a technical aspect other than basic safety rules and associated organization texts; 2.1. Dispositions relating to safety of nuclear installations 2.2. Dispositions relating to pressure vessels 2.3. Dispositions relating to quality 2.4. Dispositions relating to radioactive wastes release 2.5. Dispositions relating to activities depending of classified installations; 3. Basic Safety Rules (BSR) 3.1. BSR relating to PWR 3.2. BSR relating to nuclear installations other than PWR 3.3. Other BSR [fr

  18. Zero air emission and zero drilling waste landfill leachate collection well installation method

    International Nuclear Information System (INIS)

    Miller, M.S.; Hornsby, R.G.

    1992-01-01

    Landfilling of industrial wastes is an extensively used means of disposal throughout the US. Prior to RCRA, many landfills were little more than excavated trenches. During the construction and filling of such trenches, the long-term environmental impact was seldom considered. Water (leachate) management for these early landfills was not part of engineering or operating considerations. Today, waste management facilities succeed or fail on the quality of their leachate management efforts, as judged by groundwater quality around the landfill. The CECOS International Inc. facility near Livingston, Louisiana has three pre-RCRA disposal units (landfills) that were designed, constructed, and closed by a previous owner. These disposal units were constructed without any type of leachate removal system. During 1984-1985, samples from two nearby monitor wells revealed evidence of groundwater contamination in the area, principally in the shallow (30-foot) zone. A one-year, state-approved groundwater assessment revealed the nature and extent of groundwater contamination. Later, the Louisiana Department of Environmental Quality (LDEQ) approved a remedial action plan (RAP) for this area that included: Installation of an engineered slurry wall surrounding the disposal units to isolate the shallow groundwater regime. Placement of an engineered cap over the units to prevent rainwater infiltration. Installation of several recovery wells inside the units to facilitate removal of leachate. While efforts are now underway to provide for removal of impacted groundwater in the vicinity of these old wells, the long-term solution is to reduce or, to the greatest extent possible, eliminate the liquid volume inside the cells. This paper deals with the installation of 16 leachate recovery wells inside the pre-RCRA disposal units

  19. 30 CFR 77.1605 - Loading and haulage equipment; installations.

    Science.gov (United States)

    2010-07-01

    ... UNDERGROUND COAL MINES Loading and Haulage § 77.1605 Loading and haulage equipment; installations. (a) Cab... railroads shall be designed, installed, and maintained in a safe manner consistent with the speed and type... projection of moving railroad equipment shall be provided on at least one side of the tracks; all places...

  20. Authorization for the functioning of installations for food irradiation

    International Nuclear Information System (INIS)

    1980-09-01

    The conditions for the functioning of nuclear installations destinated to food irradiation are established according to the decree n 0 72718 of August, 29, 1973. These conditions are applied to any nuclear installations that uses food irradiation aiming to research or production of food in industrial scale. (E.G.) [pt

  1. Annual report 1 January - 31 December 1978 computer installation

    International Nuclear Information System (INIS)

    1979-05-01

    The computer installation of Risoe National Laboratory functions as an internal service bureau. The staff is concentrated around operating the computer and providing expertise in the fields of numerical mathematics, statistics, operation research, systems software, and software engineering. Selected parts of the activities at the Computer Installation are described. (B.P.)

  2. 26 CFR 1.381(c)(8)-1 - Installment method.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 4 2010-04-01 2010-04-01 false Installment method. 1.381(c)(8)-1 Section 1.381(c)(8)-1 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Insolvency Reorganizations § 1.381(c)(8)-1 Installment method. (a) Carryover...

  3. Installation Strategic Planning Guidebook

    Science.gov (United States)

    2012-05-01

    Installation natural resource concerns (for example, wetlands , number of endangered species, water use restrictions, encroachment on training lands...Koehler Publishing, 1994 7. Strategy Safari – A Guided Tour Through the Wilds of Strategic Management by Henry Mintzberg, Bruce Ahlstrand, and...T. (1987). NY: Knopf 36. Shaping Strategic Planning: Frogs, Dragons, Bees and Turkey Tails. Pfeiffer, J. W., Goodstein, L. D. & Nolan, T. M. (1989

  4. Design of the Los Alamos generator installation

    International Nuclear Information System (INIS)

    Boenig, H.J.; Schillig, J.B.; Rogers, J.D.; Huddleston, S.W.; Konkel, H.E.; Rosev, B.J.

    1989-01-01

    A 1430 MVA synchronous generator from a cancelled nuclear power plant is being installed at Los Alamos to be used as the pulsed power generator for the Confinement Physics Research Facility. The generator is mounted on a spring foundation to avoid dynamic forces from being transmitted to the substructure and the ground. A 6 MW load-commutated inverter drive will accelerate the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method is being changed from hydrogen to air cooling. A current limiting fuse, with a fuse clearing current of 80 kA, will protect the generator output against short circuit currents. Changes in the excitation system are described. A status report of the installation and an approximate schedule for completing the installation are presented. The paper also addresses results of special studies and tests undertaken to evaluate the condition of the generator and to predict the behavior of some critical mechanical generator components under pulsed loading conditions. 1 ref., 4 figs., 2 tabs

  5. Instalation of two emergency diesel groups in Angra-1

    International Nuclear Information System (INIS)

    Spitalnik, J.; Doria, L.

    1990-01-01

    As any technology that evolves, nuclear technology is no exception, mainly when new safety conditions of operation, more limited and restricted than previous ones, are introduced to assure increased protection to the public and the environment. NUCLEN has been actively involved in this type of activity in relation with the Angra-1 nuclear power plant. An important example is the Emergency Diesel Project to install in the power plant, two Diesel sets in addition to the existing ones. Experience gathered in this Project has also shown the way local firms, respectively in the fields of design engineering and power plant operation, were able to structure their teams to fulfill successfully a nuclear project both complex and pioneering. This report shows relevant aspects of the Diesel sets project design and erection, with special emphasis on the solution of problems related to the construction of a nuclear facility of the class-1 type, built under both German and US standards. (author) [pt

  6. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  7. Wireless installation standard

    International Nuclear Information System (INIS)

    Lim, Hwang Bin

    2007-12-01

    This is divided six parts which are radio regulation law on securing of radio resource, use of radio resource, protection of radio resource, radio regulation enforcement ordinance with securing, distribution and assignment of radio regulation, radio regulation enforcement regulation on utility of radio resource and technical qualification examination, a wireless installation regulation of technique standard and safety facility standard, radio regulation such as certification regulation of information communicative machines and regulation of radio station on compliance of signal security, radio equipment in radio station, standard frequency station and emergency communication.

  8. Installation package - home solar heater

    Science.gov (United States)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  9. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations

    International Nuclear Information System (INIS)

    Lacour, J.

    1964-01-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [fr

  10. Philosophy and safety requirements for land-based nuclear installations

    International Nuclear Information System (INIS)

    Kellermann, Otto

    1978-01-01

    The main ideas of safety philosophy for land-based nuclear installations are presented together with their background of protection goals. Today's requirements for design and quality assurance are deductively shown. Finally a proposition is made for a new balancing of safety philosophy according to the high safety level that nuclear installations have reached

  11. ATLAS Software Installation on Supercomputers

    CERN Document Server

    Undrus, Alexander; The ATLAS collaboration

    2018-01-01

    PowerPC and high performance computers (HPC) are important resources for computing in the ATLAS experiment. The future LHC data processing will require more resources than Grid computing, currently using approximately 100,000 cores at well over 100 sites, can provide. Supercomputers are extremely powerful as they use resources of hundreds of thousands CPUs joined together. However their architectures have different instruction sets. ATLAS binary software distributions for x86 chipsets do not fit these architectures, as emulation of these chipsets results in huge performance loss. This presentation describes the methodology of ATLAS software installation from source code on supercomputers. The installation procedure includes downloading the ATLAS code base as well as the source of about 50 external packages, such as ROOT and Geant4, followed by compilation, and rigorous unit and integration testing. The presentation reports the application of this procedure at Titan HPC and Summit PowerPC at Oak Ridge Computin...

  12. Improvement of an installation to generate shock waves

    Energy Technology Data Exchange (ETDEWEB)

    1974-04-29

    An installation to generate a shock wave in a fluid layer is described. A water projectile is moved at a high velocity. It leaves behind an underpressure in which the adjacent water implodes, therby generating the desired shock wave. The installation is characterized by a tube-shaped hull in which a piston can move freely. One side of the hull is connected to the pressure-generator chamber of the piston. (6 claims)

  13. Facebook Applications' Installation and Removal: A Temporal Analysis

    OpenAIRE

    Kagan, Dima; Fire, Michael; Elyashar, Aviad; Elovici, Yuval

    2013-01-01

    Facebook applications are one of the reasons for Facebook attractiveness. Unfortunately, numerous users are not aware of the fact that many malicious Facebook applications exist. To educate users, to raise users' awareness and to improve Facebook users' security and privacy, we developed a Firefox add-on that alerts users to the number of installed applications on their Facebook profiles. In this study, we present the temporal analysis of the Facebook applications' installation and removal da...

  14. Radiation protection systems on the TESLA Accelerator Installation

    International Nuclear Information System (INIS)

    Pavlovic, R.

    1996-01-01

    In the Institute of Nuclear sciences VINCA, the Accelerator Installation TESLA which is an medium energy ion accelerator facility consisting of an isochronous cyclotron VINCY, a heavy ion source, a D/H ion source, three low energy and five high energy experimental channels is now under construction. Some problems in defining radiation protection and safety programme, particularly problems in construction appropriate shielding barriers at the Accelerator Installation TESLA are discussed in this paper. (author

  15. Chapter 4. Assessment and inspection of nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    Supervisory activity of Nuclear Regulatory Authority of the Slovak Republic (UJD) upon the safety of nuclear installations in compliance with the 'Atomic Act' and other legal regulations includes also inspection and assessment activities of UJD. Assessment activity of UJD in relation to nuclear installations lies in assessment of safety documentation for constructions realised as nuclear installations, or constructions through which changes are realised on nuclear installations. The scope of safety documentation required for the assessment is stipulated in the Atomic Act. In 2000 the assessment activity focused first of all on Unit 1 of NPP Bohunice after completing its Gradual Reconstruction Programme, on National Repository of Radioactive waste in Mochovce and on radioactive waste conditioning and treatment technology in Jaslovske Bohunice. Activities of UJD in assessment focused mainly on control of compliance with requirements for nuclear safety, assessment of commissioning programmes, operating procedures, limits and conditions, etc. The assessment of changes, which influence nuclear safety of nuclear installations in operation, realisation of which is conditioned by the approval from UJD, is a significant part of the assessment activity of UJD. Mainly it is the assessment of design changes, changes in limits and conditions, operating procedures, changes in programmes of periodical testing of equipment important in terms of nuclear safety, changes in physical protection of nuclear equipment, etc. The assessment of nuclear installations operational safety, based on assessment of operational events, on maintaining limits and conditions of safe operation, on operational safety performance indicators and on inspection results is a separate category in the assessment activity of UJD. Inspection activity specified in the 'Atomic Act' is governed by an internal guideline, an important part of which is an annual inspection plan that considers the following types of

  16. Monitoring and evaluation of Blyth Offshore Wind Farm. Installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, L.

    2001-07-01

    The principle aim of this report is to appraise the practical aspects of installation and commissioning of the offshore wind farm. The construction and installation activities of the project were monitored and reviewed by the project team to enable recommendations for future larger projects to be made. This report particularly looks at how the project progressed against the construction and installation schedule with regard to weather conditions and operational procedures. The document not only describes the methods of installation, assembly and cable laying, but also reviews the effectiveness of those methods including any difficulties that were encountered and the solutions that were found. (author)

  17. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  18. Plutonium: resuspension of aerosols in nuclear installations: bibliographic survey

    International Nuclear Information System (INIS)

    Guetat, Ph.; Monfort, M.; Armand, P.; Alloul-Marmor, L.

    2006-01-01

    This document presents an analysis and a bibliographical synthesis of the studies on resuspension factors for plutonium. It aims at helping the engineers of safety to specify the scenarios of accidents which relate to their activities and to bring elements justified for the definition of their term-source 'installation' in the safety reports of the installations. (authors)

  19. 30 CFR 75.310 - Installation of main mine fans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of main mine fans. 75.310 Section... mine fans. (a) Each main mine fan shall be— (1) Installed on the surface in an incombustible housing... that gives a signal at the mine when the fan either slows or stops. A responsible person designated by...

  20. The inspection of (collective) tapwater installations in 2009. Progress report; De controle van collectieve leidingwaterinstallaties in 2009. Voortgang controletaak

    Energy Technology Data Exchange (ETDEWEB)

    Dik, H.H.J.

    2011-02-15

    For the first time since 2004, less newly build collective tap water installations show shortcomings. This is true for both the first inspection and the follow-up inspections preformed by the water companies. This seems to indicate a break in the trend of previous years where less newly build installations pass inspection without shortcomings. Still, one-third of the inspected installations do not comply with legionella regulations when first inspected. These non-compliances can be the cause of high to very high risk of contamination of the installation or the public mains system. These conclusions are drawn from the inspections preformed in 2009 by the drinking water companies in newly build and existing installations. By order of the Dutch Ministry of Infrastructure and the Environment and the VROM Inspectorate, the Institute for Public Health and the Environment of the Netherlands (RIVM) compile a yearly report since 2004 on the inspection of tap water installations. In 2009 more than 47.000 newly build and existing installations were inspected. The inspections have found and resolved more than 8000 situations of high to very high risk for public health. In existing installations, the number of non-compliance found at first inspections has decreased over the years. At the second inspection of installations that do not comply, the number of non-complying installations increases. The cause of this trend is unknown, and should be investigated. Only a quarter of the installations that must comply with special regulations for the prevention of Legionella (high-priority installations like hospitals, swimming pools, etc.) comply at first inspection. Starting from 2009, these installations are inspected according to a special intervention strategy. It is still too early to see results from this strategy. [Dutch] Voor het eerst sinds 2004 vertonen minder collectieve leidingwaterinstallaties in nieuwbouw gebreken. Dit geldt voor zowel de eerste (basis)controle als de

  1. Practical methods for radiation survey in nuclear installations

    International Nuclear Information System (INIS)

    Shweikani, R.

    2001-12-01

    This study is placed to those who are responsible to perform radiation survey in the nuclear installations, especially the beginners. Therefore, it gives a comprehensive view to all-important aspects related to their work starting from the structure of atoms to the practical steps for radiation survey works. So, it clarify how to perform personal monitoring, methods for monitoring surface contamination, methods for measuring radioactivity of gases and radioactive aerosols in air, monitoring radiation doses, measuring radiation influences in workplaces and finally measuring internal exposure of radiation workers in nuclear installations. Finally, The study shows some cases of breaches of radiation protection rules in some American nuclear installations and describes the final results of these breaches. The aim of this is to assure that any breach or ignore to radiation protection principles may produce bad results, and there is no leniency in implementing environmental radiation protection principles. (author)

  2. 16 CFR 460.15 - How installers must handle fact sheets.

    Science.gov (United States)

    2010-01-01

    ... ADVERTISING OF HOME INSULATION § 460.15 How installers must handle fact sheets. If you are an installer, you... from you, you must show them the fact sheet(s) for the type(s) of insulation they want. You can decide...

  3. LHC: installation du plus grand trajectographe au silicium du monde

    CERN Multimedia

    2008-01-01

    The installation of the largest silicon trajectograph of the world was concluded at CERN. Thursday December 13 at dawn, the silicon trajectograph with ribbons of CMS (*) began its trip from the principal site of CERN to its installation of experimentation.

  4. The Origin and Role of Trust in Local Policy Elites' Perceptions of High-Voltage Power Line Installations in the State of Arkansas.

    Science.gov (United States)

    Tumlison, Creed; Moyer, Rachael M; Song, Geoboo

    2017-05-01

    The debate over an installation of high-voltage power lines (HVPLs) has been intense, particularly in northwest Arkansas. Detractors claim that the installation will negatively affect both the natural environment and the local economy, which contains a large tourism component. By contrast, those in favor of installing HVPLs claim that the installation is necessary in order to reliably support the increasing demand for electric power. Using original data collected from a recent statewide Internet survey of 420 local policy elites in Arkansas, this article focuses on two key aspects. First, we examine how local policy elites' perceptions of risks versus benefits of HVPL installation in their communities are influenced by their levels of trust toward information provided by various sources (e.g., energy industry, environmental groups, and government). Second, we utilize cultural theory to explain how the cultural worldviews of policy elites--specifically, egalitarianism, individualism, hierarchism, and fatalism--shape these levels of trust and HVPL benefit-risk perceptions, while controlling for other factors claimed by previous literature, including levels of knowledge on energy-related issues and demographic characteristics. In general, our analysis indicates that policy elites' value-oriented formation of HVPL benefit-risk perceptions is partially due to the influence cultural values have on trust in information sources. We conclude this article by discussing broader implications for the origin and role of trust in policy elites' decisions throughout the policy-making process. © 2016 Society for Risk Analysis.

  5. Approach and organisation of radiation sources safety and security of installations

    International Nuclear Information System (INIS)

    Al-Hilali, S.

    1998-01-01

    Development of application of techniques using radiation sources was fact in all public domains. Although all these techniques were meant for so called peaceful uses they should respect safety regulations in order to ensure safety of personnel, public and the environment. Security system for installations adopted by CNESTEN is based on establishing administrative and technical protection of the installation against external or internal aggression on one hand and protection of the environment by confining radioactivity, on the other hand. Application of Methode Organisee et Systematique d'analyse de risque (MOSAR) at the installations of CNESTEN showed weak points in order to define barriers for prevention and means necessary for management and dealing with accidental situations. At the first stage this attitude was limited to qualitative considerations adopting macroscopic analysis of each installation. Experience obtained from operation of these installation, which have started operation hardly a few months ago, would establish a real database indispensable for complete risk analysis including quantification of possible risks

  6. Completed installations and the individual commissioning of the KSTAR MG system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang-Hwan, E-mail: kch2004@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Eom, Dae-young; Lee, Woo-Jin; Kong, Jong-Dea; Joung, Nam-Young; Kim, Yang-Soo; Kwon, Myeun [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Jang, Eun; Han, Chul-Woo; Lee, Sel-Ki; Kim, Gwang-Seon; Maeng, Jae-Hoon [Vitzrotech Co., Ltd, 605-2 Seonggok-dong, Danwon-gu, Ansan, Gyeonggi-do 425-833 (Korea, Republic of)

    2014-04-15

    Highlights: • All components of the MG system were made from each professional supplier and installed completely in the NFRI site. • The building and the overhead crane which need to install the MG system, were built in two sections. One is for the bearing, rotor and stator and the other section is for the VVVF and excitation system. • The dummy coil testing will commence in July 2013 and the comprehensive performance test of MG will be tested from August when the MPS commissioning is processing with superconducting coil. - Abstract: Peak power of 200 MVA is required in order to achieve the goal within a long pulse scenario for the final operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The available grid power is only 100 MVA at the National Fusion Research Institute (NFRI) site. Motor generator (MG) was considered as a method of resolving such problems. The design of the KSTAR MG system was completed in July 2010 and individual devices were produced by relevant manufacturers. The installation of individual devices was completed in December 2012. Specifically, the stator and rotor were assembled at the site due to their large size and weight. The bearings, variable voltage variable frequency (VVVF) and excitation systems were transported and installed on site after being manufactured externally. The building used for MG installation was built in 2011. With the building designed for ease of installation, an overhead crane was designed to allow access to the loading bay. In this paper, we discuss the installation of the MG system and the construction of the building suitable for installation of individual devices. In addition, performance on the test results of individual devices is also discussed.

  7. Classified installations for environmental protection: Tome 3. Departmental orders, memorandum, technical instructions

    International Nuclear Information System (INIS)

    Anon.

    1993-06-01

    Legislation about classified installations or plants govern most of industries or dangerous or pollutant activities. This legislation aims to prevent risks and harmful effects coming from an installation or equipments : air pollution, water pollution, noise, wastes produced by installation, even aesthetic bad effects are taken in account. Pollutant or dangerous activities are defined in a list called nomenclature which obliged installations to a rule of declaration or authorization. Technical regulations ordered by the prefect (administrator of a french department) are listed in tome 3

  8. Funding Site Cleanup at Closing Army Installations: A Stochastic Optimization Approach

    National Research Council Canada - National Science Library

    Ardic, Sureyya

    2001-01-01

    ...) to help determine how to allocate limited yearly funding to installations for environmental cleanup, Considering environmental policies and yearly installation funding requests from 2002 to 2015...

  9. Plutonium: resuspension of aerosols in nuclear installations: bibliographic survey; Le plutonium: mise en suspension d'aerosols dans les installations nucleaires: synthese bibliographique

    Energy Technology Data Exchange (ETDEWEB)

    Guetat, Ph.; Monfort, M.; Armand, P. [CEA Bruyeres-le-Chatel, Dept. Analyse Surveillance Environnement, Service Radioanalyse Chimie Environnement, 91 (France); Alloul-Marmor, L. [Societe APTUS, 78 - Versailles (France)

    2006-07-01

    This document presents an analysis and a bibliographical synthesis of the studies on resuspension factors for plutonium. It aims at helping the engineers of safety to specify the scenarios of accidents which relate to their activities and to bring elements justified for the definition of their term-source 'installation' in the safety reports of the installations. (authors)

  10. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  11. TFTR Inner Support Structure final assembly and installation

    International Nuclear Information System (INIS)

    Rocco, R.E.; Brown, G.; Carglia, G.; Heitzenroeder, P.; Koenig, F.; Mookerjee, S.; Raugh, J.

    1983-01-01

    The Inner Support Structure (ISS) of the TFTR provides a specific level of restraint to the net centering force and overturning moment produced by the Toroidal Field (TF) coils and to the vertical forces produced by the Inner Poloidal Field (PF) coils. This is accomplished consistent with the need for four radial dielectric breaks running the entire length of the ISS to prevent eddy current loops. A brief description of the major components, method of manufacture and material selection of the ISS and PF coils is presented. Particular attention is given to the integration of the PF coils and the ISS components into the total assembly and the installation of strain gauges and crack monitors on the ISS. The requirements of no gaps at the interfaces of the ISS teeth at all three horizontal planes is discussed. The problem encountered with achieving the no gap requirement and the successful resolution of this problem, including its impact on installation of the ISS, is also discussed. The installation of the ISS, including setting in position, preloading with TF coil clips, and final tensioning of the tension bars is discussed. A brief description of the lower and upper lead stem splicing operation is presented. Subsequent to the final assembly, electrical tests were performed prior to and after installation on the TFTR machine. An overview of the tests and their results is presented

  12. Installation of wireless LAN system into the SuperKEKB accelerator tunnel

    International Nuclear Information System (INIS)

    Iwasaki, Masako; Satoh, Masanori

    2014-01-01

    We have installed a wireless LAN system of the accelerator control network into the accelerator tunnel for SuperKEKB, which is the upgrade plan of the KEKB B-factory project. The wireless LAN system is used for the construction and maintenance of the accelerator components. The leaky coaxial cable (LCX) antennas are installed into the arc sections of SuperKEKB tunnel, and the collinear antennas are installed into the straight sections and the injector Linac. We have selected the LCX and collinear antennas with good radiation hardness of more than 1 MGy. After the installation, we evaluated the wireless LAN system and obtained the good network speed performance in the whole tunnel area. (author)

  13. Inventory of chemical releases of nuclear installations in the North-Cotentin; Inventaire des rejets chimiques des installations nucleaires du Nord-Cotentin

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-15

    The nuclear installations concerned by this study are Cogema La Hague, the Flamanville nuclear power plant, the Manche plant and the National Navy of Cherbourg.The objective followed by the ' source term ' work group has consisted in counting and examining the whole of existing measures relative to the releases of chemical substances in the liquid and gaseous effluents. Then because of the lack of measures for the operation first years of installations, the work group has estimated the order of magnitude of these chemical releases (essentially for Cogema La Hague). This report presents a review of the literature looking at the background levels of chemicals in different environmental compartments: air, soil, plants and animals products. these values have been summarized here to be available for comparisons with concentrations input by the North Cotentin nuclear installations, calculated by the G.R.N.C. (radioecology group of Nord Cotentin)

  14. 75 FR 8001 - Airworthiness Directives; Hawker Beechcraft Corporation (Type Certificate No. A00010WI Previously...

    Science.gov (United States)

    2010-02-23

    ... protection for proper installation of MOV and spark gap wiring. The service information also describes... strike protection for proper installation of MOV and spark gap wiring. This proposed AD would also... issuing this AD to detect and correct improper installation of the MOV and spark gap wiring, which could...

  15. 46 CFR 169.680 - Installation of wiring for power and lighting circuits.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.680 Installation of wiring for power...

  16. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...

  17. Treasure Transformers: Novel Interpretative Installations for the National Palace Museum

    Science.gov (United States)

    Hsieh, Chun-Ko; Liu, I.-Ling; Lin, Quo-Ping; Chan, Li-Wen; Hsiao, Chuan-Heng; Hung, Yi-Ping

    Museums have missions to increase accessibility and share cultural assets to the public. The National Palace Museum intends to be a pioneer of utilizing novel interpretative installations to reach more diverse and potential audiences, and Human-Computer Interaction (HCI) technology has been selected as the new interpretative approach. The pilot project in partnership with the National Taiwan University has successfully completed four interactive installations. To consider the different nature of collections, the four systems designed against different interpretation strategies are uPoster, i-m-Top, Magic Crystal Ball and Virtual Panel. To assess the feasibility of the project, the interactive installations were exhibited at the Taipei World Trade Center in 2008. The purpose of this paper is to present the development of the "Treasure Transformers" exhibition, design principles, and effectiveness of installations from the evaluation. It is our ambition that the contributions will propose innovative media approaches in museum settings.

  18. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Keller, W.

    1976-01-01

    A nuclear reactor installation includes a pressurized-water coolant reactor vessel and a concrete biological shield surrounding this vessel. The shield forms a space between it and the vessel large enough to permit rapid escape of the pressurized-water coolant therefrom in the event the vessel ruptures. Struts extend radially between the vessel and shield for a distance permitting normal radial thermal movement of the vessel, while containing the vessel in the event it ruptures, the struts being interspaced from each other to permit rapid escape of the pressurized-water coolant from the space between the shield and the vessel

  19. Règle d'installation vidéosurveillance

    CERN Document Server

    2011-01-01

    Ce référentiel définit les exigences techniques minimales applicables aux systèmes de vidéosurveillance, avec des caméras implantées à l’intérieur ou l’extérieur. Il donne des recommandations pour concevoir, installer et maintenir des systèmes de vidéosurveillance dans des applications de sécurité. Pour une vidéosurveillance efficace, on pourra appliquer la méthodologie proposée : comment réaliser l’analyse de risque ? Quel rôle attribuer au système de vidéosurveillance ? quel système mettre en place, avec quelles fonctions et quelles caractéristiques techniques ? comment réaliser l’installation ? comment assurer la maintenance du système ? Cette nouvelle édition a notamment pour objectifs de : compléter les rôles de la vidéosurveillance (gestion d'activité) ; clarifier la définition des objectifs de prise de vue ; inclure l'utilisation d'une cible normalisée pour la réception de l'installation ; mettre à disposition un outil d'aide pour les petits systèmes ;...

  20. Solution for Improve the Efficiency of Solar Photovoltaic Installation

    OpenAIRE

    Petru Chioncel; Cristian Paul Chioncel; Nicoleta Gillich

    2013-01-01

    This paper present a solution for improving efficiency of solar photovoltaic installation, realized with fixed solar photovoltaic modules, placed in solar parks or individual installations. The proposed solution to increase the radiation on the solar photovoltaic panels is to use some thin plates covered with a reflective blanket, mounted in front of the solar photovoltaic modules, with the possibility of their adjustment.

  1. Measurements of image characteristics of DSA installations

    International Nuclear Information System (INIS)

    Busch, H.P.; Strauss, L.G.; Freimarck, R.D.

    1984-01-01

    Measurements for quantifying the image characteristics were carried out on three DSA installations (DVI 1 - Philips, Angiotron - Siemens and DF 3000 - General Eletric). Contrast resolution was measured with a vessel phantom (General Electric) and spatial resolution with a lead grid. A further parameter was the dose entering the image intensifier. The Angiotron was used with an intensifier with 53 cm. diameter and the DF 3000 with temporal subtraction of the video images and the subtraction of dual energy images (hybrid technique). These measurements can be carried out quickly and easily and are a step towards standardisation of measurements of image characteristics of DSA installations. (orig.) [de

  2. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sim, Bong Shick; Kim, Y. S.; Lee, C. Y. and others

    1999-03-01

    The principal contents of this project are to design, fabricate and install the steady-state fuel test loop in HANARO for nuclear technology development. Procurement and fabrication of main equipment, licensing and technical review for fuel test loop have been performed during 2 years(1997, 1998) for this project. Following contents are described in the report. - Procurement and fabrication of the equipment, piping for OPS - IPS manufacture - License - Technical review and evaluation of the FTL facility. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and review ofHANARO interface have been performed respectively. (author)

  3. 75 FR 27422 - Airworthiness Directives; Hawker Beechcraft Corporation (Type Certificate No. A00010WI Previously...

    Science.gov (United States)

    2010-05-17

    ... lightning strike protection for proper installation of metal oxide varistor (MOV) and spark gap wiring. This... issuing this AD to detect and correct improper installation of the MOV and spark gap wiring, which could.... September 2009. wiring installation for the MOV and spark gap. Alternative Methods of Compliance (AMOCs) (g...

  4. Electro magnetic compatibility of cabling and wiring in buildings and installations

    OpenAIRE

    Steenstra, H.T.

    2008-01-01

    The thesis deals with the behaviour, with respect to EMC (Electro Magnetic Compatibility), of cabling and wiring in buildings and installations. Measurement and calculation methods are developed and applied to cabling in a large scale installation as well as to individual cables. Besides, the location and interconnection of conductors, especially concrete reinforcement, in a building is investigated. Finally a procedure is developed that is used to deal with EMC issues in a large installation...

  5. Mineral insulated thermocouples - installation in steam generating plant

    International Nuclear Information System (INIS)

    Bridges, W.J.; Brown, J.F.

    1980-01-01

    The main areas of interest considered are Central Station Fossil Fuel fired boilers of around 500 MW capacity, AGR Boilers, and Industrial and Research Development projects. While the requirement for temperature measurement in each of these areas may vary the techniques adopted to overcome installation and protection problems created by thermal, chemical and mechanical hazards remain basically the same. The reasons for temperature measurement are described together with methods of attachment development and procedures for protection of the thermocouple along its route length until its exit from the hazardous environment. These relative accuracies of the different attachments are discussed along with factors influencing the life of the thermocouple. In many instances thermocouple installation is either a once only opportunity and/or an expensive exercise. It is therefore essential to develop and apply an effective quality control system during the installation phase. An effective system is described. Finally, a brief outline of possible future trends is given. (author)

  6. Reduction of Dynamic Loads in Mine Lifting Installations

    Science.gov (United States)

    Kuznetsov, N. K.; Eliseev, S. V.; Perelygina, A. Yu

    2018-01-01

    Article is devoted to a problem of decrease in the dynamic loadings arising in transitional operating modes of the mine lifting installations leading to heavy oscillating motions of lifting vessels and decrease in efficiency and reliability of work. The known methods and means of decrease in dynamic loadings and oscillating motions of the similar equipment are analysed. It is shown that an approach based on the concept of the inverse problems of dynamics can be effective method of the solution of this problem. The article describes the design model of a one-ended lifting installation in the form of a two-mass oscillation system, in which the inertial elements are the mass of the lifting vessel and the reduced mass of the engine, reducer, drum and pulley. The simplified mathematical model of this system and results of an efficiency research of an active way of reduction of dynamic loadings of lifting installation on the basis of the concept of the inverse problems of dynamics are given.

  7. Nuclear medicine installations supervisors interactive course (CD-ROM)

    International Nuclear Information System (INIS)

    Williart, A.; Shaw, M.; Tellez, M.

    2000-01-01

    The professionals who work as Nuclear Medicine Installations Supervisors need a suitable training. This training must be based on the guidelines of the C.S.N. (the Spanish Agency for Nuclear Safety). The traditional training courses must comply with a set of requirements, that not always is possible to get: They are given in a settled place. They are developed during a time, more or less lengthy. This time is pre-established. However, the persons willing to follow these courses have some difficulties with the place and the time. Many of them do not live near the places where the courses are given, in general in big cities, while there are Nuclear Medicine Installations scattered through all Spain. Moreover in some occasions they have not available time to attend the courses. Many times, faced with so many obstacles, the option is not to do the suitable training course. In order to solve this kind of problems we offer an Interactive Training Course (supported by CD-ROM). The course contents are based on Spanish Regulations and on the Safety Guide, established by C.S.N., for approval Radioactive Installations Supervisors Training Courses. This guide includes General Topics for Radioactive Installations and Specific Subjects for Nuclear Medicine. (General topics) Basic knowledge on the fundamental concepts on the action and nature of Ionizing Radiations, their risks and preventions. The ionizing radiations. Biological effects of ionizing radiations. Radiological protection. Legislation on radioactive installations. (Specific Subjects) Knowledge on the radiological risks associated to the proper techniques in the specific field of application. In our case the specific field is Nuclear Medicine Installations, where the radioactive sources are used for diagnostic or for therapy. Specific legal and administrative aspects. Non-encapsulated radioactive sources. Associated radiological risks to the use of non-encapsulated sources. Installations design. Operative procedures

  8. Remote installation of risers on underground nuclear waste storage tanks

    International Nuclear Information System (INIS)

    Jackson, J.P.; Gessner, R.F.

    1988-03-01

    The West Valley Demonstration Project was established to solidify 2120 m 3 (560,000) gallons of high-level nuclear waste generated during six years of commercial nuclear fuel reprocessing. This liquid will be processed to remove radioactive elements which, with the remaining sludge, will be combined with glass formers and be converted into borosilicate glass. Risers were installed on the high-level tank for installation of pumps which will be used to remove the liquid and sludge. The extensive use of remote technology was required to install the risers and to minimize operator exposure to high levels of radiation and contamination. The riser installation required remotely: drilling through two feet of concrete shielding; installing pump access pipes which are welded to the tank top; and cutting holes in tanks located 3658 mm (12) feet below ground. These operations were successfully completed 13 times without exposing personnel to high-level radiation or contamination. Specially designed remote equipment was developed for each step of this operation. Extensive operator training in the use of this equipment was performed on a tank with low radiation prior to work on the high-level tank. This paper discusses the application of remote technology that assured a quality job was safely accomplished. 3 refs., 18 figs., 2 tabs

  9. Remote handling installation of diagnostics in the JET Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Allan, P., E-mail: Peter.Allan@ccfe.ac.uk [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Loving, A.B. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Omran, H. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom); Collins, S.; Thomas, J. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Parsloe, A.; Merrigan, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); British Nuclear Services, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Hassall, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom)

    2011-10-15

    The requirement for an upgrade of the diagnostics for the JET ITER Like Wall (ILW) while maintaining personnel exposure to contamination as low as reasonably practicable or ALARP, has necessitated the development of a bespoke set of diagnostic components. These components, by virtue of their design and location, require a versatile yet comprehensive suite of remote handling tools to undertake their in-vessel installation. The installation of the various diagnostic components is covered in multiple tasks. Each task requires careful assessment and design of tools that can successfully interface with the components and comply with the handling and installation requirements. With remote maintenance a requirement, the looms/conduits were designed to be modular with connections which are electrically connected when the module is fitted or conversely disconnected when removed. The shape of each complex and often bulky component is verified during the design phase, to ensure that it can be delivered and installed to its specified location in the torus. This is done by matching the kinematic capabilities of the remote handling system and the path of the component through the torus by using a state of the art virtual reality system.

  10. A statistical evaluation of formation disturbance produced by well- casing installation methods

    Science.gov (United States)

    Morin, R.H.; LeBlanc, D.R.; Teasdale, W.E.

    1988-01-01

    Water-resources investigations concerned with contaminant transport through aquifers comprised of very loose, unconsolidated sediments have shown that small-scale variations in aquifer characteristics can significantly affect solute transport and dispersion. Commonly, measurement accuracy and resolution have been limited by a borehole environment consisting of an annulus of disturbed sediments produced by the casing-installation method. In an attempt to quantify this disturbance and recognize its impact on the characterization of unconsolidated deposits, three installation methods were examined and compared in a sand-and-gravel outwash at a test site on Cape Cod, Massachusetts. These installation methods were: 1) casing installed in a mud-rotary hole; 2) casing installed in an augered hole; and 3) flush-joint steel casing hammer-driven from land surface. Fifteen wells were logged with epithermal neutron and natural gamma tools. Concludes that augering is the most disruptive of the three casing-installation methods and that driving casing directly, though typically a more time-consuming operation, transmits the least amount of disturbance into the surrounding formation. -from Authors

  11. Nuclear installations and childhood cancer in the U.K

    International Nuclear Information System (INIS)

    Goldsmith, J.R.

    1990-01-01

    The report in November 1983 of a cluster of childhood leukemia cases in the vicinity of the Sellafield (Windscale) nuclear facility on the west coast of England has led to a substantial effort to study possible excess cancer in the vicinity of British nuclear installations. Although some additional excesses were found, the causal relationship with radionuclides was thought unlikely because the estimated doses were below those established as causal of increase in human leukemia. Since 1956, we have known that diagnostic x-rays during pregnancy are associated with increased risks from childhood cancer, especially leukemia. Gardner et al. showed that excess cases near Sellafield were in children born there, and no excess occurred among in-migrants. Roman et al. showed that significant elevations in leukemia among children living near three nuclear installations in the Midlands were only at 0-5 y, suggesting that the relevant exposure was prenatal. We identify and discuss a set of epidemiological, dosage estimation, and modeling problems relevant to interpretation of such data. We conclude that: (1) a red bone marrow-based model for brief, high-level exposures of adults associated with myelogenous leukemia is inappropriate for evaluating the impact of internal emitters, relatively continuous exposures in perinatal periods in association with acute lymphatic leukemia; (2) incidence of mortality rates of childhood leukemia should be evaluated in the vicinity of nuclear installations in many countries; and (3) in contrast to nuclear reprocessing and nuclear weapons installations, there is little evidence of excess childhood leukemia among residents in areas adjacent to nuclear power installations in the U.K

  12. Installation of concrete expansion anchors at the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Clark, G.L.

    1980-01-01

    Installation criteria utilized at the Fast Flux Test Facility for concrete expansion anchors are presented. Static and dynamic load capabilities of various anchor types are discussed in relation to design loads, with particular emphasis placed on the yield load (the proportional limit). Effects of several variables (i.e., installation torque, hole diameter) are also investigated. Resolution and documentation of field problems (e.g., improper spacing, embedment, angularity) are also described. Recommendations for improving and controlling future installations are given

  13. Development of cryogenic installations for large liquid argon neutrino detectors

    CERN Document Server

    Adamowski, M; Geynisman, M; Hentschel, S; Montanari, D; Nessi, M; Norris, B

    2015-01-01

    A proposal for a very large liquid argon (68,000 kg) based neutrino detector is being studied. To validate the design principles and the detector technology, and to gain experience in the development of the cryostats and the cryogenic systems needed for such large experiments, several smaller scale installations will be developed and implemented, at Fermilab and CERN. The cryogenic systems for these installations will be developed, constructed, installed and commissioned by an international engineering team. These installations shall bring the required cooling power under specific conditions to the experiments for the initial cool-down and the long term operation, and shall also guarantee the correct distribution of the cooling power within the cryostats to ensure a homogeneous temperature distribution within the cryostat itself. The cryogenic systems shall also include gaseous and liquid phase argon purification devices to be used to reach and maintain the very stringent purity requirements needed for these...

  14. Solution for Improve the Efficiency of Solar Photovoltaic Installation

    Directory of Open Access Journals (Sweden)

    Petru Chioncel

    2013-01-01

    Full Text Available This paper present a solution for improving efficiency of solar photovoltaic installation, realized with fixed solar photovoltaic modules, placed in solar parks or individual installations. The proposed solution to increase the radiation on the solar photovoltaic panels is to use some thin plates covered with a reflective blanket, mounted in front of the solar photovoltaic modules, with the possibility of their adjustment.

  15. Drones and safety of nuclear installations

    International Nuclear Information System (INIS)

    Tourneur, Jean-Claude

    2015-01-01

    Recent flyovers of French nuclear power plants by drones or UAVs (the owners of these drones could not be identified) has made the safety of these nuclear installations a matter of concern. These events also raised the question of balance between secret and information about these installations. The French Parliamentary Office for the Assessment of Scientific and Technological Choices (OPECST) organised two sets of hearings, a confidential one with people in charge of information related to national defence and security, and a public one opened to all stakeholders. This article briefly reports and discusses the results of these hearings. It appeared that these flyovers are not really a threat, are more a communication action than anything else. Suggestions have been made for the development of researches in the field of drone detection, and also for evolutions of French legislation on drones

  16. Integrated installation for offshore wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Way, J.; Bowerman, H.

    2003-07-01

    A project to investigate the feasibility of integrating the offshore installation of foundation, turbine and tower for offshore wind turbines into one operation is described. Three separate objectives are listed. They are: (1) Telescopic tower study - reversible process incorporating lift and lock mechanisms; (2) Transportation study - technical and economic feasibility of transporting and installing a wind turbine unit via a standard barge with minimal conversion and (3) Self-burial system study - to demonstrate the feasibility of self burial of a slab foundation via controlled jetting beneath the slab. The background to the study and the proposed concepts are discussed. The work carried out to date and the costs are reported together with the findings. Recommendations for future work are listed. The work was carried out by Corus UK Ltd and is managed by Future Energy Solutions for the DTI.

  17. Influence of matrix attachment installation load on movement and resultant forces in implant overdentures.

    Science.gov (United States)

    Goto, Takaharu; Nagao, Kan; Ishida, Yuichi; Tomotake, Yoritoki; Ichikawa, Tetsuo

    2015-02-01

    This in vitro study investigated the effect of attachment installation conditions on the load transfer and denture movements of implant overdentures, and aims to clarify the differences among the three types of attachments, namely ball, Locator, and magnet attachments. Three types of attachments, namely ball, Locator, and magnetic attachments were used. An acrylic resin mandibular edentulous model with two implants placed in the bilateral canine regions and removable overdenture were prepared. The two implants and bilateral molar ridges were connected to three-axis load-cell transducers, and a universal testing machine was used to apply a 50 N vertical force to each site of the occlusal table in the first molar region. The denture movement was measured using a G(2) motion sensor. Three installation conditions, namely, the application of 0, 50, and 100 N loads were used to install each attachment on the denture base. The load transfer and denture movement were then evaluated. The resultant force decreased with increasing installation load for all attachments. In particular, the resultant force on implants on the loading side of the Locator attachment significantly decreased when the installation load was increased from 0 to 50 N, and that for magnetic attachment significantly decreased when the installation load was increased from 50 to 100 N. For the residual ridges on the loading side, the direction of the forces for all attachments changed to downward with increasing installation load. Furthermore, the yaw Euler angle increased with increasing installation load for the magnetic attachment. Subject to the limitations of this study, the use of any installation load greater than 0 N is recommended for the installation of ball and Locator attachments on a denture base. Regarding magnetic attachments, our results also recommend installation on a denture base using any installation load greater than 0 N, and suggest that the resultant force acting on the implant can be

  18. Megagauss Magnetic Field Sensors Based on Ag2Te

    International Nuclear Information System (INIS)

    Stephen Mitchen; Allen L. Johnson; John W. Farley

    2006-01-01

    Pulsed power machines capable of producing tremendous energy face various diagnostic and characterizing challenges. Such devices, which may produce 10 - 100MAs, have traditionally relied on Faraday rotation and Rogowski coil technology for time-varying current measurements. Faraday rotation requires a host of costly optical components, including fibers, polarizers, retarders, lasers, and detectors, as well as setup, alignment, and time-consuming post-processing to unwrap the time-dependent current signal. Rogowski coils face potential problems such as physical distortion to the sensor itself due to the tremendous strain caused by magnetically induced pressures, which is proportional to the magnetic field squared (B2). Electrical breakdown in the intense field region is also a major concern. Other related challenges include, but are not limited to, bandwidth and inductance limitations and susceptibility issues related to electrical magnetic interference (EMI)

  19. ELABORATION OF NOT LARGE MOBILE MODULAR INSTALLATION ''AQUA - EXPRESS'' (300 L/H) FOR LRW CLEANING

    International Nuclear Information System (INIS)

    Karlin, Yurii; Dmitriev, Sergey; Iljin, Vadim; Ojovan, Mihail; Burcl, Rudolf

    2003-01-01

    Mobile modular installation ''Aqua-Express'' is a liquid low level and intermediate level radioactive waste (LL and ILRW) treatment facility, intended for not large research centers and other organizations, which activity causes the formation of a few quantity (up to 500 m3/year) of low and intermediate level radioactive waste water. Mobile modular installation ''Aqua-Express'' has the following features: (1) filtration, sorption and ultrafiltration units are used for LL and ILRW purification; (2) installation ''Aqua-Express'' consists of a cascade of three autonomous aqueous liquid waste-purifying installations; (3) installation ''Aqua-Express'' is a mobile installation; the installation can be transported by car, train, ship, or plane, as well as placed in a standard transport (sea or railway) container; (4) installation ''Aqua-Express'' does not includes any technological equipment for conditioning the secondary radioactive waste. Productivity of the installation ''Aqua-Express'' by purified water depends on composition of the initial liquid waste and makes up to 300 l/h. In present report is described the design of installation ''Aqua-Express'', theory of LRW purification in the installation ''Aqua-Express'' and some results of its use at cleaning real radioactive waters at State unitary enterprise - MosNPO ''Radon''

  20. Design basis and requirements for 241-SY modular exhauster mechanical installation

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1994-01-01

    A new ventilation system is being installed to serve as the K-1 primary exhauster. The existing K-1 primary exhauster will then become the backup. This ventilation system services waste tanks 241-SY-101, 102 and 103. The nominal flow rate through the ventilation system is 1,000 cfm. The new ventilation system will contain a moisture eliminator, a heater, a prefilter, two stages of HEPA filtration, an exhaust fan, a stack and stack sampling system. The purpose of this document is to serve as the design and functional requirements for the mechanical installation of the new 241-SY modular exhauster. The mechanical installation will include modifying the existing ductwork (i.e., installing a ''T'' to connect the new exhauster to the existing system), modifying the existing condensate drain lines to accommodate the new lines associated with the new exhauster, a maintenance platform near the stack of the new exhauster, guy wires and guy wire footings to support the stack of the new exhauster, as well as other miscellaneous tasks associated with the mechanical installation design effort

  1. Programmable DSP-based multi-bunch feedback--operational experience from six installations

    International Nuclear Information System (INIS)

    Fox, J.; Prabhakar, S.; Teytelman, D.; Young, A.; Stover, G.; Drago, A.; Serio, M.; Khan, S.; Knuth, T.; Kim, Y.; Park, M.

    2000-01-01

    A longitudinal instability control system, originally developed for the PEP-II, DAΦNE and ALS machines has in the last two years been commissioned for use at the PLS and BESSY-II light sources. All of the installations are running identical hardware and use a common software distribution package. This common structure is beneficial in sharing expertise among the labs, and allows rapid commissioning of each new installation based on well-understood diagnostic and operational techniques. While the installations share the common instability control system, there are significant differences in machine dynamics between the various colliders and light sources. These differences require careful specification of the feedback algorithm and system configuration at each installation to achieve good instability control and useful operational margins. This paper highlights some of the operational experience at each installation, using measurements from each facility to illustrate the challenges unique to each machine. Our experience on the opportunities and headaches of sharing development and operational expertise among labs on three continents is also offered

  2. Design, Fabrication and Installation of the Charcoal Filter Housing in RIPF

    International Nuclear Information System (INIS)

    Kim, Min Jin; Lim, I. C.; Bang, H. S.

    2008-05-01

    In the Hot Cell Bank 3 of the Radioisotope Production Facility, production and dispense of I-131 solution and capsule that are used for the diagnosis and treatment of thyroid cancer are made. The original charcoal filter housings installed in 1994 and were utilized until the leakage of a very small amount of radio-iodine was found due to the erroneous installation of the charcoal filter in the filter housing. Thus the production of I-131 was discontinued until the repair and performance testing of the filter housing and the inspection by the regulatory body were finished. Although the production of I-131 was resumed, there was a desire for installing the brand-new charcoal filter housing which has an intrinsically safe design and no possibility of leakage. This report describes the design, fabrication and installation of brand-new charcoal filter housing. And also were described the dismantlement of the old housings, the assessment of the structural integrity of the shielding concrete wall and the installation of the shielding doors

  3. Memorandum of Understanding on cooperation and consultation on nuclear installations near borders

    International Nuclear Information System (INIS)

    1977-01-01

    This Agreement signed on 27 September 1977 lays down that the Contracting Parties will inform each other about all nuclear installations constructed along the common border. Nuclear installations within the meaning of the Agreement are installations for the production, processing, reprocessing, manufacture or fission of nuclear fuels and radioactive waste storage. The information to be communicated includes plans and decisions on siting, construction and operation of such installations and relevant documents. The Agreement provides for consultation between the Parties on safety aspects and lays down in detail all the conditions for communication of information. (NEA) [fr

  4. Compact activation detectors for measuring of neutron emission on plasma focus installations

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Peregudova, E.V.; Volobuev, I.V.

    2005-01-01

    The paper presents the two compact simple systems for the measurement of the absolute neutron yield in the range 10 6 - 10 12 neutrons/pulse and higher and spatial anisotropy of neutron radiation. The systems are destined for the registration of the short duration neutron radiation of the pulsed plasma installations, such as Plasma Focus (PF), z-pinches and others plasma installations. This paper also includes the results of the neutron emission measurements on different PF installations: 'Tulip' (P.N. Lebedev Physical Institute, Moscow Russia), the PF-1000 and PF-150 installations (Institute of Plasma Physics and Laser Microfusion, Warsaw, Poland)

  5. Horn installed in CNGS tunnel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The horn is installed for the CERN Neutrinos to Gran Sasso (CNGS) project. Protons collide with a graphite target producing charged particles that are focussed by the magnetic field in the horn. These particles will then pass into a decay tube where they decay into neutrinos, which travel towards a detector at Gran Sasso 732 km away in Italy.

  6. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  7. Installation, care, and maintenance of wood shake and shingle siding

    Science.gov (United States)

    Jack Dwyer; Tony Bonura; Arnie Nebelsick; Sam Williams; Christopher G. Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shakes and shingles. The authors gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle siding, and interviews with experts having...

  8. Training and certification of PV installers in Europe

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Tournaki, Stavroula; Gkouskos, Zacharias; Masson, Gaetan; Holden, John; Huidobro, Ana; Stoykova, Evelina; Rata, Camelia; Bacan, Andro; Maxoulis, Christos; Charalambous, Anthi

    2013-01-01

    The European strategy for the coming decades sets specific targets for a sustainable growth, including reaching a 20% share of renewables in final energy consumption till 2020. To achieve this target, a number of initiatives and measures have been in force. Europe, is currently the largest market for PV systems with more than 75% of the annual worldwide installations in 2011. The favourable European policies as well as the Member States’ supporting legislations have resulted in high market growth for photovoltaics. Applying PV technologies however, requires high qualified technicians to install, repair and maintain them. Until today, national markets have been growing faster than the skilled PV installers force can satisfy. The PVTRIN, an Intelligent Energy Europe action, addresses these issues by developing a training and certification scheme for technicians active in the installation and maintenance of small scale PV systems. During the implementation of the action, a market research was conducted in the six participating countries in order to record the stakeholders’ attitudes, perceptions and considerations and to adapt the training methods, tools and materials to the national PV industry requirements and markets’ needs. Indicative results of this analysis as well as the current situation regarding relevant training and certification schemes are presented in this paper. - Highlights: ► Market research in six EU countries on PV professional Training and Certification needs. ► PVTRIN scheme integrates the national legislations and the market's needs. ► The different aspects (technical, institutional, financial) are presented

  9. Nuclear installations and childhood cancer in the UK

    International Nuclear Information System (INIS)

    Goldsmith, J.R.

    1992-01-01

    Data on cancer incidence and mortality near nuclear installations in England and Wales have been published, covering the period 1959-1980. Several age classes and a number of cancer sites have been included. Systematic analysis has so far been limited to cancer mortality. This suggests that childhood leukemia is unusually frequent near some types of installations and the excess is greater for years 0-9 than for later ages. In the earlier decade, 1959-1969, there was questionable consistency of incidence reporting. This report uses the incidence and mortality data only for the period 1971-1980; leukemia and non-leukemia cancer data for those 0-9 years are analyzed, and consistency of incidence reporting is evaluated by comparing incidence and mortality. For comparison with reported data for grouped local authority areas (LAAs) near to 21 different installations, 2 sources of expected incidence are used. The first is based on regional data, and the second is based on a group of LAAs similar in location, urban/rural character and population size. The results of this study confirm Cook-Mozaffari et al.'s findings by mortality analysis for the group of installations involved in non-power producing nuclear technology. This study sheds no light on the possible basis for the association, which remains to be clarified. Initial steps have been taken by Gardner et al. using case-referent methods. (author). 15 refs., 3 figs., 7 tabs

  10. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  11. 30 CFR 817.180 - Utility installations.

    Science.gov (United States)

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  12. Protection of civilian nuclear installations in time of armed conflict

    International Nuclear Information System (INIS)

    Lamm, V.

    2003-01-01

    The inclusion of article 56 in Protocol 1 of the Geneva convention of 12 August 1949 represents a significant achievement in the development of international humanitarian law. Article 56 of protocol 1 reads as follow: firstly, works or installations containing dangerous forces, namely dams, dykes and nuclear electrical generating stations, shall not not be made the object of attack, even where these objects are military objectives, if such attack may cause the release of dangerous forces and consequent severe losses among the civilian population. Other military objectives located at or in the vicinity of these works or installations shall not be made the object of attack if such attack may cause the release of dangerous forces from the works or installations and consequent severe losses among the civilian population. Secondly, the special protection against attack provided by paragraph 1 shall cease: for a dam or a dyke only if it is used for other than its normal function and in regular, significant and direct support of military operations and if such attack is the only feasible way to terminate such support; for a nuclear electrical generating station only if it provides electric power in regular, significant and direct support of military operations and if such attack is the only feasible way to terminate such support;for other military objectives located at or in the vicinity of these works or installations only if they are used in regular, significant and direct support of military operations and if such attack is the only feasible way to terminate such support. Thirdly, in all cases, the civilian population and individual civilians shall remain entitled to all the protection accorded them by international law, including the protection of the precautionary measures provided for in article 57. If the protection ceases and any of the works, installations or military objectives mentioned in paragraph 1 is attacked, all practical precautions shall be taken to

  13. Transport and installation of the LHC cryo-magnets

    CERN Document Server

    Artoos, K; Capatina, O; Chevalley, JM; Foraz, K; Guinchard, M; Hauviller, Claude; Kershaw, K; Prodon, S; Rühl, Ingo; Trinquart, G; Weisz, S; Ponsot, P

    2007-01-01

    Eleven years have passed between the beginning of transport and handling studies in 1996 and the completion of the LHC cryo-magnets installation in 2007. More than 1700 heavy, long and fragile cryo-magnets had to be transported and installed in the 27 km long LHC tunnel with very restricted available space. The size and complexity of the project involved challenges in the field of equipment design and manufacturing, maintenance, training and follow-up of operators and logistics. The paper presents the milestones, problems to be overcome and lessons learned during this project.

  14. Thermal solar energy. Collective domestic hot water installations

    International Nuclear Information System (INIS)

    Garnier, Cedric; Chauvet, Chrystele; Fourrier, Pascal

    2016-01-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic outlook on the way to complete the installation of a collective domestic water solar heating system. After some recall of what is solar energy, the thermal solar technology and the energy savings it may induce, this document presents the main hydraulic configurations of a solar heating system with water storage, the dimensioning of a solar water heating system and its cost estimation, the installation and the commissioning of the system, the monitoring and maintenance operations

  15. Basis of conception for emergency plans of fuel cycle installations; Bases de conception des plans particuliers d`intervention des installations du cycle du combustible

    Energy Technology Data Exchange (ETDEWEB)

    Charles, T.; Mercier, J.P. [CEA Centre d`Etudes de Fontenay-aux-Roses, 92 (France). Dept. d`Evaluation de Surete; Rzepka, J.P.; Dubiau, P.; Jouve, A.C. [CEA Centre d`Etudes de Fontenay-aux-Roses, 92 (France). Dept. de Protection de l`Environnement et des Installations

    1994-12-31

    In this text we give the principles on which the fuel cycle installations emergency plans are based. The bases are the inventory of toxic and radioactive materials contained in the installation, the credible accident and the source term, the atmospheric diffusion. On these terms the risk for population is evaluated and relocation or confinement of population is taken.

  16. Defense Infrastructure: DOD Efforts to Prevent and Mitigate Encroachment at Its Installations

    Science.gov (United States)

    2016-11-01

    installation size and projected population growth . What GAO Recommends GAO is not making recommendations in this report. DOD provided technical...Projected Population Growth at 33 Selected Installations (2015 to 2020) 32 Table 4: Summary of Benefits Reported by Readiness and Environmental...installation of interest because of the existence of or potential for future incompatible land use, and (4) projected population growth in adjacent

  17. Installation and validation of MCNP-4A

    International Nuclear Information System (INIS)

    Marks, N.A.

    1997-01-01

    MCNP-4A is a multi-purpose Monte Carlo program suitable for the modelling of neutron, photon, and electron transport problems. It is a particularly useful technique when studying systems containing irregular shapes. MCNP has been developed over the last 25 years by Los Alamos, and is distributed internationally via RSIC at Oak Ridge. This document describes the installation of MCNP-4A (henceforth referred to as MCNP) on the Silicon Graphics workstation (bluey.ansto.gov.au). A limited number of benchmarks pertaining to fast and thermal systems were performed to check the installation and validate the code. The results are compared to deterministic calculations performed using the AUS neutronics code system developed at ANSTO. (author)

  18. Idaho National Engineering Laboratory installation roadmap document

    International Nuclear Information System (INIS)

    1993-01-01

    The roadmapping process was initiated by the US Department of Energy's office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included

  19. Installation, care, and maintenance of wood shake and shingle roofs

    Science.gov (United States)

    Tony Bonura; Jack Dwyer; Arnie Nebelsick; Brent Stuart; R. Sam Williams; Christopher Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shake and shingle roofs. The authors have gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle roofs, and interviews with experts having...

  20. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  1. VG-400 atomic power and technological installation. Possible core design

    International Nuclear Information System (INIS)

    Komarov, E.V.; Laptev, F.V.; Lyubivyj, A.G.; Mitenkov, F.M.; Samojlov, O.B.; Sukhachevskij, Yu.B.

    1979-01-01

    The main characteristics, basic circuit and configuration of equipment of the VG-400 atomic power and technological installation are considered. This installation is intended for supplying with highly-potential heat of thermal electrochemical hydrogen production and for power generation in the steam-turbine cycle. The main installation characteristics: HTGR reactor heat power 1100 MW, electric power 300 MW, helium coolant pressure 50 atm, output temperature 950 deg C, steam pressure in the second contour 175 atm, temperature 535 deg C, core diameter and height 6.4 m and 4 m, respectively, number of spherical fuel elements 8.5x10 5 . The installation can ensure hydrogen production of 10 5 Nxm 3 /h. For the VG-400 reactor block the integral arrangement of the first circuit equipment in the reinforced concrete is chosen. Two versions of the reactor core with prismatic and spherical fuel elements are compared. It is shown that taking into account great potentialities of the spherical zone in a case of further temperature increase and its positive qualities with respect to construction and processing of fuel elements and graphite blocks, the utilization of simplier units and mechanisms in the overloading system and in the process of profiling of energy distribution the choice of the spherical configuration for the VG-400 pilot plant installation seems to be valid

  2. Installation method for the steel container and vessel of the nuclear heating reactor

    International Nuclear Information System (INIS)

    Chen Liying; Guo Jilin; Liu Wei

    2000-01-01

    The Nuclear Heating Reactor (NHR) has the advantages of inherent safety and better economics, integrated arrangement, full power natural circulation and dual vessel structure. However, the large thin container presents a new and difficult problem. The characteristics of the dual vessel installation method are analyzed with system engineering theory. Since there is no foreign or domestic experience, a new method was developed for the dual vessel installation for the 5 MW NHR. The result shows that the installation method is safe and reliable. The research on the dual vessel installation method has important significance for the design, manufacture and installation of the NHR dual vessel, as well as the industrialization and standardization of the NHR

  3. 32 CFR 700.325 - The Assistant Secretary of the Navy (Installations and Environment).

    Science.gov (United States)

    2010-07-01

    ... (Installations and Environment). 700.325 Section 700.325 National Defense Department of Defense (Continued... Assistants § 700.325 The Assistant Secretary of the Navy (Installations and Environment). The Assistant Secretary of the Navy (Installations and Environment) is responsible for: (a) Policy relating to Navy...

  4. Aviation Environmental Design Tool (AEDT) : Version 2c service Pack 1 : installation guide.

    Science.gov (United States)

    2016-12-01

    This document provides detailed instructions on how to install and run AEDT 2c Service Pack 1 (SP1). It is important to follow the installation instructions in the order listed below, as Microsoft SQL Server 2008 R2 is a prerequisite for AEDT. Instal...

  5. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Door design, operation, installation, and testing. 170..., operation, installation, and testing. (a) Each Class 1 door must have a quick action closing device... the welding process so that the door frame is not distorted. (e) For each watertight door which is in...

  6. Calibration of power systems and measurements of discharge currents generated for different coils in the EGYPTOR tokamak

    Czech Academy of Sciences Publication Activity Database

    Hegazy, H.; Žáček, František

    2006-01-01

    Roč. 25, 1-2 (2006), s. 73-86 ISSN 0164-0313 Institutional research plan: CEZ:AV0Z20430508 Keywords : small tokamaks * EGYPTOR tokamak * Rogowski coil Subject RIV: BL - Plasma and Gas Discharge Physics Impact factor: 1.381, year: 2006

  7. Renewable Energy Production from DoD Installation Solid Wastes by Anaerobic Digestion

    Science.gov (United States)

    2016-06-01

    ENGINEERING GUIDANCE REPORT Renewable Energy Production from DoD Installation Solid Wastes by Anaerobic Digestion ESTCP Project ER-200933 JUNE...Defense. Page Intentionally Left Blank Renewable Energy Production From DoD Installation Solid Wastes by Anaerobic Digestion ii June 2016 REPORT...3. DATES COVERED (2009 – 2016) 4. TITLE AND SUBTITLE Renewable Energy Production from DoD Installation Solid Wastes by Anaerobic Digestion 5a

  8. YB0 SERVICES INSTALLATION COMPLETED

    CERN Document Server

    The beauty of the completed YB0 was briefly visible at P5 as preparations continue for Tracker installation. A tremendous effort, lasting 7 months and involving more than 100 workers on the busiest days, resulted in 5700 electrical cables, 780 optical cables with 65k fibre channels, and 550 pipes laid on YB0 for HB, EB and Tracker.

  9. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    International Nuclear Information System (INIS)

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact

  10. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

  11. FFTF report: FFTF piping installation and welding techniques

    International Nuclear Information System (INIS)

    Gilles, J.

    1975-01-01

    The main sodium piping with a diameter of 16'' or 28 '' is being installed at the FFTF construction site starting in December 1974. The supplier and authority demarcations are: Combustion Engineering supplies the reactor vessel, guard vessel and adjoining pipes and uses the machine welding equipment ''Dimetrics''; for the piping system of the primary and secondary loops the pipes manufactured by Rollmet at HUICO, Pasco, were delivered and prefabricated there, as far as compatible with the installation. ''Astroarc'' welding machines are used by Bechtel for the piping prefabrication in the weld laboratory as well as on site at the construction site. Technical welding problems occurring during the course of the installation at the construction site and several during this time are described. At present 6 weld seams in the reactor and 14 weld seams in the secondary loop are accepted. The requirement exists to carry out as many welds as possible automatically, in order to produce sodium pipe welds of high technical quality and which are reproducible. The welding equipment is described

  12. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    International Nuclear Information System (INIS)

    Robinson, Sharon M.; Jubin, Robert Thomas; Patton, Bradley D.; Sullivan, Nicholas M.; Bugbee, Kathy P.

    2009-01-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D and D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in

  13. Relevant aspects in licensing of radioactive installations at petroleum and gas well logging

    International Nuclear Information System (INIS)

    Miranda, Marcia Valeria da E. Sa

    2002-01-01

    The importance of the various factors considered during the process of licensing of radioactive installation for petroleum and gas well logging. This process involves the issuing of some public power acts, the co called Administrative Acts. For the radioactive installations the Administrative Acts are related to the Norm CNEN-NE-6.02 'Licensing of Radioactive Installation'. In the conduction of the licensing of radioactive installation of mobile nuclear measurement devices the safety evaluation of radioactive installation and equipment containing incorporated radiation source are included; certification of radioprotection supervisors; programing and evaluation of the radioprotection inspections; and the conduction of conformal inspection according to the project, safety analysis and audits. An evaluation of the impact of the importance grade attributed to each factor in the optimization of licensing process is related. Finally, the prediction of implantation of a control system for the displacement of radioactive sources in the installation is approached comprehending the up-to-date localization of each source at different work front of the Basis

  14. The air quality in ventilation installations. Practical guidelines; Qualite de l'air dans les installations aerauliques. Guide pratique

    Energy Technology Data Exchange (ETDEWEB)

    Angeli, L. [France Air, 91 - Chilly Mazarin (France); Bianchina, M. [Unelvent, 93 - Le Bourget (France); Blazy, M. [Anjos, 01 - Torcieu (France); Boulanger, X. [Aldes, 21 - Chenove (France); Chiesa, M. [Atlantic (France); Duclos, M. [Groupe Titanair, 69 - Lyon (France); Hubert, D.; Kridorian, O. [Groupe Astato, Blanc Mesnil (France); Josserand, O. [Carrier (Belgium); Lancieux, C. [Camfil, 60 - Saint Martin Longueau (France); Lemaire, J.C. [Agence de l' Environnement et de la Maitrise de l' Energie, ADEME, 75 - Paris (France); Petit, Ph. [Compagnie Industrielle d' Applications Thermiques ( CIAT ), 75 - Paris (France); Ribot, B. [Electricite de France (EDF), 75 - Paris (France); Tokarek, S. [Gaz de France (GDF), 75 - Paris (France); Bernard, A.M.; Tissot, A. [Centre Technique des Industries Aerauliques et Thermiques (CETIAT), 69 - Villeurbanne (France)

    2004-07-01

    The present guide aims to provide design departments, maintenance companies and builders with practical guidelines and recommendations for the installation of ventilation and air-conditioning systems. The objective is to ensure good Indoor Air Quality (IAQ) and to safeguard the health and well-being of the occupants. The guide deals with aspects of design, dimensioning, installation and servicing, all of which play a major role in guaranteeing IAQ and duct-work hygiene. These steps are reviewed for the principal ventilation systems met in both residential and commercial premises. The first part presents the system and draws the attention of the user to specific points which require particular care in term of IAQ. The second part details recommended practice component by component, in respect of design, installation and servicing. Application of these simple guidelines during the various project stages is essential, in order to ensure a good IAQ in ventilation systems. Content: introduction; good ventilation; systems: exhaust ventilation, balanced ventilation, air handling unit, terminal ventilation units, impact of systems on indoor air quality, components: air inlet, air filter, heat recovery unit, heating or cooling coil, humidifier, mechanical fan unit, cowl and hybrid ventilation fan, mixing box, ventilation duct-work, air outlet and air terminal device; references.

  15. 46 CFR 56.97-40 - Installation tests.

    Science.gov (United States)

    2010-10-01

    ... attached to boilers by welding without practical means of blanking off for testing, the piping shall be...) Fixed oxygen-acetylene system piping. (b) Installation testing requirements for refrigeration, fluid...

  16. Bacterial community structures in air conditioners installed in Japanese residential buildings.

    Science.gov (United States)

    Hatayama, Kouta; Oikawa, Yurika; Ito, Hiroyuki

    2018-01-01

    The bacterial community structures in four Japanese split-type air conditioners were analyzed using a next-generation sequencer. A variety of bacteria were detected in the air filter of an air conditioner installed on the first floor. In the evaporator of this air conditioner, bacteria belonging to the genus Methylobacterium, or the family of Sphingomonadaceae, were predominantly detected. On the other hand, the majority of bacteria detected in the air filters and evaporators of air conditioners installed on the fifth and twelfth floors belonged to the family Enterobacteriaceae. The source of bacteria belonging to the family Enterobacteriaceae may have been aerosols generated by toilet flushing in the buildings. Our results suggested the possibility that the bacterial contamination in the air conditioners was affected by the floor level on which they were installed. The air conditioner installed on the lower floor, near the ground, may have been contaminated by a variety of outdoor bacteria, whereas the air conditioners installed on floors more distant from the ground may have been less contaminated by outdoor bacteria. However, these suppositions may apply only to the specific split-type air conditioners that we analyzed, because our sample size was small.

  17. Spallation Neutron Source High Power RF Installation and Commissioning Progress

    CERN Document Server

    McCarthy, Michael P; Bradley, Joseph T; Fuja, Ray E; Gurd, Pamela; Hardek, Thomas; Kang, Yoon W; Rees, Daniel; Roybal, William; Young, Karen A

    2005-01-01

    The Spallation Neutron Source (SNS) linac will provide a 1 GeV proton beam for injection into the accumulator ring. In the normal conducting (NC) section of this linac, the Radio Frequency Quadupole (RFQ) and six drift tube linac (DTL) tanks are powered by seven 2.5 MW, 402.5 MHz klystrons and the four coupled cavity linac (CCL) cavities are powered by four 5.0 MW, 805 MHz klystrons. Eighty-one 550 kW, 805 MHz klystrons each drive a single cavity in the superconducting (SC) section of the linac. The high power radio frequency (HPRF) equipment was specified and procured by LANL and tested before delivery to ensure a smooth transition from installation to commissioning. Installation of RF equipment to support klystron operation in the 350-meter long klystron gallery started in June 2002. The final klystron was set in place in September 2004. Presently, all RF stations have been installed and high power testing has been completed. This paper reviews the progression of the installation and testing of the HPRF Sys...

  18. 40 CFR 1039.130 - What installation instructions must I give to equipment manufacturers?

    Science.gov (United States)

    2010-07-01

    ... COMPRESSION-IGNITION ENGINES Emission Standards and Related Requirements § 1039.130 What installation instructions must I give to equipment manufacturers? (a) If you sell an engine for someone else to install in a... manufacturers not to install the engines in variable-speed applications. (6) Describe any other instructions to...

  19. Chapter 7: Renewable Energy Options and Considerations for Net Zero Installations

    Energy Technology Data Exchange (ETDEWEB)

    Booth, Samuel

    2017-03-15

    This chapter focuses on renewable energy options for military installations. It discusses typical renewable technologies, project development, and gives examples. Renewable energy can be combined with conventional energy sources to provide part or all of the energy demand at an installation. The appropriate technology mix for an installation will depend on site-specific factors such as renewable resources, energy costs, local energy policies and incentives, available land, mission compatibility, and other factors. The objective of this chapter is to provide basic background information and resources on renewable energy options for NATO leaders and energy personnel.

  20. Solar installations as an object for investors - Expansion in Europe

    International Nuclear Information System (INIS)

    Niederhaeusern, A.

    2007-01-01

    This article takes a look at Edisun Power, a Swiss solar contracting company. Although only ten years old, the company has founded branch offices in Germany, Spain and France. The history of the company is examined and its various photovoltaic installations are described. These include installations in the Megawatt class in Spain. The financing of such large installations and the risks involved are discussed, as are the strongly varying political frameworks for solar power and its advancement in various European countries. The situation in Switzerland with the introduction of cost-covering remuneration for solar-generated electricity is discussed. Financial aspects of the company's operations and the recent issue of additional shares in the company are discussed.

  1. Automated Installation Verification of COMSOL via LiveLink for MATLAB

    International Nuclear Information System (INIS)

    Crowell, Michael W

    2015-01-01

    Verifying that a local software installation performs as the developer intends is a potentially time-consuming but necessary step for nuclear safety-related codes. Automating this process not only saves time, but can increase reliability and scope of verification compared to ''hand'' comparisons. While COMSOL does not include automatic installation verification as many commercial codes do, it does provide tools such as LiveLink"T"M for MATLAB® and the COMSOL API for use with Java® through which the user can automate the process. Here we present a successful automated verification example of a local COMSOL 5.0 installation for nuclear safety-related calculations at the Oak Ridge National Laboratory's High Flux Isotope Reactor (HFIR).

  2. Automated Installation Verification of COMSOL via LiveLink for MATLAB

    Energy Technology Data Exchange (ETDEWEB)

    Crowell, Michael W [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-01-01

    Verifying that a local software installation performs as the developer intends is a potentially time-consuming but necessary step for nuclear safety-related codes. Automating this process not only saves time, but can increase reliability and scope of verification compared to ‘hand’ comparisons. While COMSOL does not include automatic installation verification as many commercial codes do, it does provide tools such as LiveLink™ for MATLAB® and the COMSOL API for use with Java® through which the user can automate the process. Here we present a successful automated verification example of a local COMSOL 5.0 installation for nuclear safety-related calculations at the Oak Ridge National Laboratory’s High Flux Isotope Reactor (HFIR).

  3. Seismic risk and safety of nuclear installations. A look at the Cadarache Centre

    International Nuclear Information System (INIS)

    Verrhiest-Leblanc, G.; Chevallier, A.

    2010-01-01

    After a brief recall of some important seismic events which occurred in the past in the south-eastern part of France, the authors indicate the nuclear installations present in this region. They outline the difference between requirements for a usual building and for basic nuclear installations. They indicate laws and regulations which are to be applied to these installations like to any hazardous industrial installation. They describe the seismic risk as it has been determined for the Cadarache area, and evoke the para-seismic design of new nuclear installations which are to be built in Cadarache and actions for a para-seismic reinforcement of existing constructions. Finally, they evoke organisational aspects (emergency plans) and the approach for a better information and transparency about the seismic risk

  4. Regulatory requirements and administrative practice in safety of nuclear installations

    International Nuclear Information System (INIS)

    Servant, J.

    1977-01-01

    This paper reviews the current situation of the France regulatory rules and procedures dealing with the safety of the main nuclear facilities and, more broadly, the nuclear security. First, the author outlines the policy of the French administration which requires that the licensee responsible for an installation has to demonstrate that all possible measures are taken to ensure a sufficient level of safety, from the early stage of the project to the end of the operation of the plant. Thus, the administration performs the assessment on a case-by-case basis, of the safety of each installation before granting a nuclear license. On the other hand, the administration settles overall safety requirements for specific categories of installations or components, which determine the ultimate safety performances, but avoid, as far as possible, to detail the technical specifications to be applied in order to comply with these goals. This approach, which allows the designers and the licensees to rely upon sound codes and standards, gains the advantage of a great flexibility without imparing the nuclear safety. The author outlines the licensing progress for the main categories of installations: nuclear power plants of the PWR type, fast breeders, uranium isotope separation plants, and irradiated fuel processing plants. Emphasis is placed on the most noteworthy points: standardization of projects, specific risks of each site, problems of advanced type reactors, etc... The development of the technical regulations is presented with emphasis on the importance of an internationally concerned action within the nuclear international community. The second part of this paper describes the France operating experience of nuclear installations from the safety point of view. Especially, the author examines the technical and administrative utilization of data from safety significant incidents in reactors and plants, and the results of the control performed by the nuclear installations

  5. Economic viability of present-day biomass energy installations; Wirtschaftlichkeit von heutigen Biomasse-Energieanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Markus Sommerhalder, M; Schelske, O [Ernst Basler und Partner AG, Zuerich (Switzerland); Nussbaumer, T [Verenum, Zuerich (Switzerland); Engeli, H [Engeli Engineering, Neerach (Switzerland); Membrez, Y; Ndoh, M; Tacchini, C [EREP SA, Aclens (Switzerland)

    2007-03-15

    This illustrated, comprehensive report for the Swiss Federal Office of Energy (SFOE) takes a look at the economic viability of biomass energy installations. The installations examined included wood-fired installations, biogas installations and those using bio-diesel and bio-ethanol. The system boundaries involved are defined and various factors that influence cost calculations are examined. The resulting heat and electricity prices for various energy sources and systems are presented and discussed. Examples of small and large-scale installations are presented. For wood-energy, combined heat and power system producing electricity at powers of 1 to 5 MWe are looked at and the various factors influencing their viability are discussed. Biogas installations of various sizes are discussed and the differing investment costs involved are commented on. Here, large industrial installations using communal green wastes are also examined and the influence of communal waste-collection charges on the price for the electricity generated is discussed, as is the influence of the market for the residual compost produced. The production and use of biogas in public wastewater treatment plants is also looked at, including the use of co-substrates. As far as biogenic liquid fuels such as bio-diesel and bio-ethanol are concerned, the report takes a brief look at the situation concerning installations in Switzerland and reviews the production costs involved. Various conclusions are drawn for the various energy sources reviewed as well as for the prices for heat and electrical energy obtained.

  6. Climate Change Planning for Military Installations: Findings and Implications

    Science.gov (United States)

    2010-10-01

    climate change as an emerging issue with potential national security implications. As a result of these concerns, the DoD Strategic Environmental Research and Development Program (SERDP) is establishing a research and development program to address climate change effects on DoD installations and associated missions. To help establish the program, SERDP tasked Noblis to identify potential climate change effects on military installations and their missions and operations. This report presents the findings portion of this study and

  7. Offshore windfarm proposal to reduce costs of foundations and installations.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-09-04

    The principle aim of this project is to develop innovative pile insertion, installation vessel pile handling and pile transfer systems that reduce the installed cost per kW of offshore wind turbine foundation installation. The project was to accomplish this by first developing a novel method of handling foundation piles without the use of craneage thereby allowing long piles of 5-6m diameter to be lifted safely in shallow water. This would extend the operating envelope by allowing work to continue without the weather constraints associated with lifting heavy loads by crane. The method would eventually reduce the size of the pile installation barge resulting in reduced installation costs. This part of the project has been satisfactorily completed, resulting in an innovative pile handling technique. Secondly a nonpercussive pile insertion method would be developed suitable for large diameter piles. The targeted aims of this method are as follows: To reduce or negate the need to handle and dispose of large amounts of spoil. To eliminate the need for piling hammers large enough to drive 6m diameter piles. These would be too heavy for the present generation of offshore cranes to lift, and the rental costs exorbitant. The advantages of these aims are: A reduction in the noise pollution produced by all percussive methods of pile driving and in particular large hammers. These noise levels are unacceptable to present and future environmental constraints. Because of the reduced drill spoil being handled compared to an industry standard full face drill, the energy consumption and therefore cost, is also reduced. Owing to the high cost and risk associated with mobilising and operating the equipment necessary for field trials in a marine environment (the cost for mobilising and operating a construction jack-up barge, all backup marine support craft, pile driving hammers and test piles can be several times the available grant funding), it was decided and agreed at an early stage

  8. Participatory ergonomics applied in installation work

    NARCIS (Netherlands)

    Jong, A.M. de; Vink, P.

    2002-01-01

    This paper evaluates a step-by-step participatory approach to better work, applied in reducing the musculoskeletal workload in installation work. To arrive at a reduction in workload, a steering group led the project through the following steps: Introduction: defining the goal and informing all 7000

  9. Impact of size and distribution of installed PV power in E-W direction on the level in which selected consumers’ energy needs were met

    Directory of Open Access Journals (Sweden)

    Necka Krzysztof

    2018-01-01

    Full Text Available The aim of the study was to analyse the energy needs of selected consumers and to select the PV installed capacity in the east and west panels orientation (E-W. The analysis was carried out for two variants. The first concerned the impact of the installation power of a PV source on the contracted power in its symmetric east and west position. The second variant was the result of previous observations and studies of the authors of this paper. Thus, in this variant, the unbalanced power of PV E-W in relation to the S azimuth has been analyzed, taking into account the characteristics of the recipients' needs and the variation of the PV power installed. The analyses show that an increase in meeting the energy demand for two of the tested plants at symmetrical power distribution to the east and west occurred only when the installed power was increased to the level of approx. 1.4-1.6 of the contracted power. However, the power distribution in the E-W direction has a very strong effect on the energy amount that is generated in the power plant and cannot be used due to the lack of demand in the plant.

  10. Ground mounted photovoltaic installations. Guide for an impact study

    International Nuclear Information System (INIS)

    2011-01-01

    Legally, an impact study must be performed for ground mounted photovoltaic installations with a power greater than 250 kW. This guide is aimed at helping the actors of the photovoltaic sector to perform impact studies. After the description of the characteristics of a photovoltaic installation (principles, technical characteristics of a ground mounted installation, impact of photovoltaic systems on climate) and a presentation of the legal framework (European commitments, Grenelle de l'Environnement, applicable procedures), this report present the objectives and approach of an impact study, describes how the environment is taken into account from the early stages of a project, how the impact study is to be prepared. The last part describes the different components of the impact study: legal content, project description, analysis of the site initial status and environment, analysis of the project effects, rationale for the choice of the project

  11. Mechanical construction and installation of the ATLAS tile calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Abdallah, J [IFIC, Centro Mixto Universidad de Valencia-CSIC, E46100 Burjassot, Valencia (Spain); Adragna, P; Bosi, F [Pisa University and INFN, Pisa (Italy); Alexa, C; Boldea, V [Institute of Atomic Physics, Bucharest (Romania); Alves, R [LIP and FCTUC University of Coimbra (Portugal); Amaral, P; Andresen, X; Behrens, A; Blocki, J [CERN, Geneva (Switzerland); Ananiev, A [LIP and IDMEC-IST, Lisbon (Portugal); Anderson, K [University of Chicago, Chicago, Illinois (United States); Antonaki, A [University of Athens, Athens (Greece); Batusov, V [JINR, Dubna (Russian Federation); Bednar, P [Comenius University, Bratislava (Slovakia); Bergeaas, E; Bohm, C [Stockholm University, Stockholm (Sweden); Biscarat, C [LPC Clermont-Ferrand, Université Blaise Pascal, Clermont-Ferrand (France); Blanch, O; Blanchot, G [Institut de Fisica d' Altes Energies, Universitat Autònoma de Barcelona, Barcelona (Spain); others, and

    2013-11-01

    This paper summarises the mechanical construction and installation of the Tile Calorimeter for the ATLAS experiment at the Large Hadron Collider in CERN, Switzerland. The Tile Calorimeter is a sampling calorimeter using scintillator as the sensitive detector and steel as the absorber and covers the central region of the ATLAS experiment up to pseudorapidities ±1.7. The mechanical construction of the Tile Calorimeter occurred over a period of about 10 years beginning in 1995 with the completion of the Technical Design Report and ending in 2006 with the installation of the final module in the ATLAS cavern. During this period approximately 2600 metric tons of steel were transformed into a laminated structure to form the absorber of the sampling calorimeter. Following instrumentation and testing, which is described elsewhere, the modules were installed in the ATLAS cavern with a remarkable accuracy for a structure of this size and weight.

  12. Mechanical construction and installation of the ATLAS tile calorimeter

    International Nuclear Information System (INIS)

    Abdallah, J; Adragna, P; Bosi, F; Alexa, C; Boldea, V; Alves, R; Amaral, P; Andresen, X; Behrens, A; Blocki, J; Ananiev, A; Anderson, K; Antonaki, A; Batusov, V; Bednar, P; Bergeaas, E; Bohm, C; Biscarat, C; Blanch, O; Blanchot, G

    2013-01-01

    This paper summarises the mechanical construction and installation of the Tile Calorimeter for the ATLAS experiment at the Large Hadron Collider in CERN, Switzerland. The Tile Calorimeter is a sampling calorimeter using scintillator as the sensitive detector and steel as the absorber and covers the central region of the ATLAS experiment up to pseudorapidities ±1.7. The mechanical construction of the Tile Calorimeter occurred over a period of about 10 years beginning in 1995 with the completion of the Technical Design Report and ending in 2006 with the installation of the final module in the ATLAS cavern. During this period approximately 2600 metric tons of steel were transformed into a laminated structure to form the absorber of the sampling calorimeter. Following instrumentation and testing, which is described elsewhere, the modules were installed in the ATLAS cavern with a remarkable accuracy for a structure of this size and weight

  13. 40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...

  14. Adaptation of fast responding power supply for radial position control in SST-1

    International Nuclear Information System (INIS)

    Sharma, Dinesh Kumar; Patel, Kiritkumar B.; Singh, Akhilesh Kumar; Dhongde, Jasraj

    2013-01-01

    A high current, fast responding power supply was installed in 2005 for vertical stabilization of elongated plasmas in SST-1 tokamak. Presently, during initial experiments of SST-1 tokamak the need for radial control during current build-up was envisaged. For this purpose the existing power supply was suitable and the same was re-commissioned and control adaptations were carried as per experimental requirements. This paper highlights the capabilities of the power supply and details the modifications in the control interfaces and test programs for the radial control purpose. Details of the operation of the power supply along with control interfaces with performance measurements are provided. The re-commissioning provided an opportunity in the trouble shooting methods and sequential operation of the system. With the operational use on the actual coil the mutual effects are understood better and appropriate test programs are prepared. The power supply provided satisfactory performance for the intended use. In additional the system is suitable to simulate a plasma current loop to enable the testing and calibration of Rogowski coil used for plasma current measurement. (author)

  15. A new linear plasma device for the study of plasma waves in the electron magnetohydrodynamics regime

    Science.gov (United States)

    Joshi, Garima; Ravi, G.; Mukherjee, S.

    2018-06-01

    A new, user-friendly, linear plasma device has been developed in our laboratory where a quiescent (Δ n/n ≈ 1%), low temperature (1-10 eV), pulsed (3-10 ms) plasma can be produced over a large uniform region of 30-40 cm diameter and 40 cm length. Salient features of the device include the flexibility of tuning the plasma density in the range of 10^{10} to 10^{12} cm^{-3} and capability of scanning the plasma and field parameters in two dimensions with a precision of electromagnetic field parameters by miniature magnetic probes and Rogowski coils. The plasma produced is uniform and essentially unbounded for performing experiments on waves and turbulence. The whole device can be operated single-handedly by undergraduate or graduate students. The device can be opened, serviced, new antennas/probes installed and ready for operation in a matter of hours. Some results on the excitation of electromagnetic structures in the context of electron magnetohydrodynamics (EMHD) are also presented to demonstrate the suitability of the device for carrying out such experiments.

  16. NSTX High Temperature Sensor Systems

    International Nuclear Information System (INIS)

    McCormack, B.; Kugel, H.W.; Goranson, P.; Kaita, R.

    1999-01-01

    The design of the more than 300 in-vessel sensor systems for the National Spherical Torus Experiment (NSTX) has encountered several challenging fusion reactor diagnostic issues involving high temperatures and space constraints. This has resulted in unique miniature, high temperature in-vessel sensor systems mounted in small spaces behind plasma facing armor tiles, and they are prototypical of possible high power reactor first-wall applications. In the Center Stack, Divertor, Passive Plate, and vessel wall regions, the small magnetic sensors, large magnetic sensors, flux loops, Rogowski Coils, thermocouples, and Langmuir Probes are qualified for 600 degrees C operation. This rating will accommodate both peak rear-face graphite tile temperatures during operations and the 350 degrees C bake-out conditions. Similar sensor systems including flux loops, on other vacuum vessel regions are qualified for 350 degrees C operation. Cabling from the sensors embedded in the graphite tiles follows narrow routes to exit the vessel. The detailed sensor design and installation methods of these diagnostic systems developed for high-powered ST operation are discussed

  17. Installation of an innovative remedial technology

    International Nuclear Information System (INIS)

    Hines, B.

    1995-01-01

    The major goal of the Lasagna trademark project was to design, construct, install, and operate an in situ remediation system in low-permeability soil. A new technology--the Lasagna process--uses electro-osmosis to move contaminated groundwater through treatment zones. The treatment zones are installed in contaminated soils, thereby forming an integrated in situ remedial process. Electro-osmosis, well known for its effectiveness and extremely low power consumption, uses a direct current to cause Groundwater to travel through low-permeability soil. When a bench-scale version of the technology was 98 percent effective in removing contamination, an actual field test was the next step. The site chosen for this first field effort was the DOE-owned Paducah Gaseous Diffusion Plant located in Paducah, Kentucky. The target contaminant for this project was trichloroethylene (TCE) because it is found at many sites across the country and is present at approximately 60 percent of DOE's sites

  18. Installation tests for BERSAFE 88

    International Nuclear Information System (INIS)

    Bamfield, R.D.; Haigh, R.

    1989-02-01

    A set of ten test problems for each of the four BERSAFE stress analysis programs is provided. These problems along with this report, which forms part of the BERSAFE 88 documentation, constitute a test of the customers' BERSAFE installation. On running the problems and attaining results identical to those presented here, the customer should have some confidence that his system is operating correctly. (author)

  19. ETSON views on R and D priorities for implementation of the 2014 Euratom Directive on safety of nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Van Dorsselaere, Jean-Pierre [IRSN/PSN, Saint-Paul-lez-Durance (France); Mustoe, Jeremy; Power, Steve [Amec Foster Wheeler RSD, Birchwood Park, Warrington (United Kingdom); Adorni, Martina [Bel V, Brussels (Belgium); Schaffrath, Andreas [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Garching (Germany); Nieminen, Anna [VTT Technical Research Centre of Finland Ltd. (Finland)

    2016-11-15

    Following the Fukushima-Daiichi accident in 2011, the Council Directive 2014/87/Euratom has reinforced the previous 2009 Directive that had established a Community framework for the safety of nuclear installations. In particular, one new article introduces a high-level EU-wide safety objective of preventing accidents through defence- in-depth and avoiding radioactive releases outside a nuclear installation. For achieving this objective, the research necessary outcomes are mainly a better knowledge of the involved physical phenomena and its capitalization in methodologies and tools such as simulation codes. ETSON, the European Technical Safety Organisation Network, had already identified in its Position Paper in 2011 the main R and D priorities. The present paper underlines that most of these priorities, with a few updates due to progress of knowledge, remain consistent with the objectives of this new Directive. And it illustrates the ETSON involvement through examples of on-going or planned R and D national and international projects.

  20. Cross-hole fracture connectivity assessed using hydraulic responses during liner installations in crystalline bedrock boreholes

    Science.gov (United States)

    Persaud, Elisha; Levison, Jana; Pehme, Peeter; Novakowski, Kentner; Parker, Beth

    2018-01-01

    In order to continually improve the current understanding of flow and transport in crystalline bedrock environments, developing and improving fracture system characterization techniques is an important area of study. The presented research examines the installation of flexible, impermeable FLUTe™ liners as a means for assessing cross-hole fracture connectivity. FLUTe™ liners are used to generate a new style of hydraulic pulse, with pressure response monitored in a nearby network of open boreholes drilled in gneissic rock of the Canadian Shield in eastern Ontario, Canada. Borehole liners were installed in six existing 10-15 cm diameter boreholes located 10-35 m apart and drilled to depths ranging between 25-45 m. Liner installation tests were completed consecutively with the number of observation wells available for each test ranging between one and six. The collected pressure response data have been analyzed to identify significant groundwater flow paths between source and observation boreholes as well as to estimate inter-well transmissivity and storativity using a conventional type-curve analysis. While the applied solution relies on a number of general assumptions, it has been found that reasonable comparison can be made to previously completed pulse interference and pumping tests. Results of this research indicate areas where method refinement is necessary, but, nonetheless, highlight the potential for use in crystalline bedrock environments. This method may provide value to future site characterization efforts given that it is complementary to, and can be used in conjunction with, other currently employed borehole liner applications, such as the removal of cross-connection at contaminated sites and the assessment of discrete fracture distributions when boreholes are sealed, recreating natural hydraulic gradient conditions.

  1. Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed

    Science.gov (United States)

    2015-09-01

    compliant GIS, usually obtained from the installation itself. NZP also includes an appropriate weather file for the location selected, using the closest...such as solar photovoltaics, solar-thermal, wind energy, biomass (wood chips, etc.), biogas , or synthetic gas need to be considered as part of the mix...have better information. In some cases, such as photovoltaics, users can obtain data from an online system and enter it into NZP. In this case, users

  2. Numerical simulation of installation of skirt foundations

    Energy Technology Data Exchange (ETDEWEB)

    Vangelsten, Bjoern Vidar

    1997-12-31

    Skirt foundation has been increasingly used for permanent offshore oil installations and anchors for drilling ships. Suction is commonly used in skirt foundation installing. If a large amount of suction is applied, the soil around the foundation may fail and the foundation become useless. This thesis studies failure due to high seepage gradients, aiming to provide a basis for reducing the risk of such failures. Skirt penetration model testing has shown that to solve the problem one must understand what is going on at the skirt tip during suction installation. A numerical model based on micro mechanics was developed as continuum hypothesis was seen to be unsuitable to describe the processes in the critical phases of the failure. The numerical model combines two-dimensional elliptical particles with the finite difference method for flow to model water flow in a granular material. The key idea is to formulate the permeability as a function of the porosity of the grain assembly and so obtain an interaction between the finite difference method on flow and the particle movement. A computer program, DYNELL, was developed and used to simulate: (1) weight penetration of a skirt wall, (2) combined suction and weight penetration of a skirt wall, and (3) critical gradient tests around a skirt wall to study failure mechanisms. The model calculations agree well with laboratory experiments. 16 refs., 124 figs., 21 tabs.

  3. An Installation of IPS Bypass Line at the Fuel Test Loop

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Ho Young; Ahn, G. H.; Lee, M.; Kim, M. S.; Cho, S. H.; Han, J. S.; Hur, S. O. [KAERI, Daejeon (Korea, Republic of)

    2010-12-15

    The Fuel Test Loop(FTL) was installed for the national goal of self-supporting technology in the field of design and construction of nuclear power plant. The FTL with the fuel irradiation equipment is essential in developing, improving and inspecting the fuel of CANDU type or PWR type nuclear power plant. The FTL should be operated at the same conditions of commercial nuclear power plant such as temperature, pressure, flow rate, neutron flux and so on. Starting designing in December 2001, the FTL was installed from March 2007 to August 2008. Especially the In Pile Section(IPS) was installed at IR1 hole in August 2008. Until September 2009 after loading the test fuel, a series of power escalation tests (LSD, CSB1, CSB2, HSB, HOP) were conducted. And it was operated at the condition of CSB2 for the 8 cycles from October 2009 to July 2010. But it could not be normally operated in early 2010, because the high radiation released from irradiated materials due to the worn down bearing of main cooling pump. So, we removed the IPS and installed a newly designed IPS bypass line to prevent increasing high radiation. In this report we will present preliminary works, main works processes, devices of making work environments, a designing and manufacturing of IPS bypass line and a rack of IPS, installing know-hows, problems and solutions broke out during the work etc. We believe that our efforts to complete successful installing and operating of the FTL system will contribute for the efficient utilization of HANARO

  4. Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Oteri, F.; Sinclair, K.

    2012-03-01

    Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

  5. Set-up and Test Procedure for Suction Installation and Uninstallation of Bucket Foundation

    DEFF Research Database (Denmark)

    Koteras, Aleksandra Katarzyna

    This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use of......) and loading frame used for those tests have been already used for axially static and cyclic loading of piles (Thomassen, 2015a) and for axially static and cyclic loading of bucket foundation (Vaitkunaite et al., 2015).......This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use...... of suction under the bucket lid or by applying additional force through the hydraulic piston, forcing the bucket to penetrate into the soil. Tests for uninstallation are performed also with the use of water pressure, as a reverse process to the suction installation. Both installation and uninstallation tests...

  6. Installation package for a solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  7. Assessment of safety of the nuclear installations of the world

    International Nuclear Information System (INIS)

    Thomas, B.A.; Pozniakov, N.; Banga, U.

    1992-01-01

    Incidents and accidents periodically remind us that preventive measures at nuclear installations are not fully reliable. Although sound design is widely recognized to be prerequisite for safe operation, it is not sufficient. An active management that compensates for the weak aspects of the installations design by redundant operational provisions, is the key factor to ensure safe operation. Safety of nuclear installations cannot be assessed on an emotional basis. Since 1986, accurate safety assessment techniques based on an integrated approach to operational safety have been made available by the ASSET services and are applicable to any industrial process dealing with nuclear materials. The ASSET methodology enables to eliminate in advance the Root Causes of the future accidents by introducing practical safety culture principles in the current managerial practices

  8. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Science.gov (United States)

    2010-07-01

    ... Operations § 250.1628 Design, installation, and operation of production systems. (a) General. All production... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Design, installation, and operation of production systems. 250.1628 Section 250.1628 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF...

  9. Electro magnetic compatibility of cabling and wiring in buildings and installations

    NARCIS (Netherlands)

    Steenstra, H.T.

    2008-01-01

    The thesis deals with the behaviour, with respect to EMC (Electro Magnetic Compatibility), of cabling and wiring in buildings and installations. Measurement and calculation methods are developed and applied to cabling in a large scale installation as well as to individual cables. Besides, the

  10. Radiation safety and radiation protection problems on the TESLA Accelerator Installation

    International Nuclear Information System (INIS)

    Pavlovic, R.; Pavlovic, S.; Orlic, M.

    1997-01-01

    As we can see from the examples of many accelerator facilities installed throughout the world with ion beam energy, mass and charge characteristics and design similar to the TESLA Accelerator Installation, there is a great diversity among them, and each radiation protection and safety programme must be designed to facilitate the safe and effective operation of the accelerator according to the needs of the operating installation. Although there is no standard radiation protection and safety organization suitable for all institutions, experience suggests some general principles that should be integrated with all the disciplines involved in a comprehensive safety programme. (author)

  11. Case histories portraying different methods of installing liners for verticle barriers

    International Nuclear Information System (INIS)

    Burke, G.K.; Crockford, R.M.; Achhorner, F.N.

    1997-01-01

    The installation of liners for vertical barriers is difficult and has been a learning experience for every contractor making the attempt. Soil stratigraphy and hydrogeologic conditions can vary over short distances, creating a variety of problems. This is particularly so when working near landfills and documentation of the as-built condition is poor. Successful installation requires detailed planning and knowledge of what to expect, as well as alternate plans for potential problems. Several successful methods of panel connection will be presented as well as a variety of installation techniques. Project case histories will be reviewed, highlighting the challenges associated with specific construction techniques

  12. Planned reliability in the transport and installation of large nuclear components

    International Nuclear Information System (INIS)

    Bieler, L.

    1988-01-01

    The transport and installation of heavy and bulky large components require detailed planning of all jobs and activities, trained and experienced personnel and corresponding technical equipment for reliable and quality-assured implementation. The correct approach to the planning and implementation of such transports and installations has been confirmed by years of successful performance of these jobs e.g. in reactor pressure vessels and steam generators for nuclear power plants. Large components for nuclear power plants are truly extreme examples but will be all the better suited for demonstrating the problems inherent in transport and installation. (orig.) [de

  13. Worldwide installed geothermal power

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    Worldwide electric energy production data are easy to compile, according to the informations given by individual countries. On the contrary, thermal applications of geothermics are difficult to quantify due to the variety of applications and the number of countries concerned. Exhaustive informations sometimes cannot be obtained from huge countries (China, Russia..) because of data centralization problems or not exploitable data transmission. Therefore, installed power data for geothermal heat production are given for 26 countries over the 57 that have answered the International Geothermal Association questionnaire. (J.S.). 1 fig., 2 tabs., 1 photo

  14. Fires of sodium installations

    International Nuclear Information System (INIS)

    Hajek, L.; Tlalka, R.

    1984-01-01

    A survey is presented of the literature dealing with fires of sodium installations between 1974 and 1981. Also described are three experimental fires of ca 50 kg of sodium in an open area, monitored by UJV Rez. The experimental conditions of the experiments are described and a phenomenological description is presented of the course of the fires. The experiments showed a relationship between wind velocity in the area surrounding the fire and surface temperature of the sodium flame. Systems analysis methods were applied to sodium area, spray and tube fires. (author)

  15. Responsible management: the Dutch licensing policy for nuclear installations

    International Nuclear Information System (INIS)

    Slange, R.

    1994-01-01

    The governmental policy, to tolerate operation of existing nuclear installations not backed by the required operating permits, certainly is applied only in exceptional cases, and this all the more when the plant is a nuclear installation. Any decision to tolerate further operation must be justified by compliance with a number of rigid criteria, there may be a debate in Parliament about the case, third parties have the right participate in the decision-finding procedure, and there is the right of appeal. (orig.) [de

  16. Installations for water desalination by reverse osmosis. P. 2

    International Nuclear Information System (INIS)

    Bauermann, H.D.; Ermert, U.

    1974-01-01

    Starting with the explanation of an installation scheme of a reverse osmosis (RO) plant for water desalination, the various parts of such a plant are firstly discussed briefly. After a chapter dealing with the feed pre-treatment required, the operation of RO-plants is dealt with. The usual variations of arrangement are shown, as well as some information given on maintenance and costs of such methods of desalination. The last part contains some examples of plants installed so far. (orig.) [de

  17. Impact of PID on industrial rooftop PV-installations

    Science.gov (United States)

    Buerhop, Claudia; Fecher, Frank W.; Pickel, Tobias; Patel, Tirth; Zetzmann, Cornelia; Camus, Christian; Hauch, Jens; Brabec, Christoph J.

    2017-08-01

    Potential induced degradation (PID) causes severe damage and financial losses even in modern PV-installations. In Germany, approximately 19% of PV-installations suffer from PID and resulting power loss. This paper focuses on the impact of PID in real installations and how different evaluated time intervals influence the performance ratio (PR) and the determined degradation rate. The analysis focuses exemplarily on a 314 kWp PV-system in the Atlantic coastal climate. IR-imaging is used for identifying PID without operation interruption. Historic electric performance data are available from a monitoring system for several years on system level, string level as well as punctually measured module string IV- curves. The data sets are combined for understanding the PID behavior of this PV plant. The number of PID affected cells within a string varies strongly between 1 to 22% with the string position on the building complex. With increasing number of PID-affected cells the performance ratio decreases down to 60% for daily and monthly periods. Local differences in PID evolution rates are identified. An average PR-reduction of -3.65% per year is found for the PV-plant. On the string level the degradation rate varied up to 8.8% per year depending on the string position and the time period. The analysis reveals that PID generation and evolution in roof-top installations on industrial buildings with locally varying operation conditions can be fairly complex. The results yield that local operating conditions, e.g. ambient weather conditions as well as surrounding conditions on an industrial building, seem to have a dominating impact on the PID evolution rate.

  18. Installation and commissioning of Scandiflash-450 flash X-ray generator at BARC, Visakhapatnam

    International Nuclear Information System (INIS)

    Banerjee, P.; Verma, R.; Shukla, R.; Sharma, S.K.; Das, B.; Prabaharan, T.; Deb, P.; Das, R.; Adhikary, B.; Meena, M.; Sagar, K.; Shyam, A.

    2014-08-01

    Energetics and Electromagnetics Division, BARC, Visakhapatnam has possessed a Flash X-ray radiography (FXR) system, make: Scandiflash, Sweden. This installation and commissioning of the system has been done by ourselves. Few problems have been detected during installation and commissioning. The troubleshooting of the system has been done. Somewhere we needed to replace the original components by indigenously made one. The complete installation and commissioning has been reportedly as far as detailed possible. Presently the system is working with satisfaction. The installed facility is being used as one of the primary means of diagnostics in many of the ongoing experiments. (author)

  19. Fiscal year 1996 well installation program summary, Y-12 Plant Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-04-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1996 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two groundwater monitoring wells were installed during the FY 1996 drilling program. One of the groundwater monitoring wells was installed in the Lake Reality area and was of polyvinyl chloride screened construction. The other well, installed near the Ash Disposal Basin, was of stainless steel construction

  20. 48 CFR 5152.245-9001 - Government property for installation support services (cost-reimbursement contracts).

    Science.gov (United States)

    2010-10-01

    ... installation support services (cost-reimbursement contracts). 5152.245-9001 Section 5152.245-9001 Federal... CONTRACT CLAUSES 5152.245-9001 Government property for installation support services (cost-reimbursement... Installation Support Services (Cost-Reimbursement Contracts) (OCT 1989) (DEV) (a) Government-furnished property...

  1. 41 CFR 101-39.304 - Modification or installation of accessory equipment.

    Science.gov (United States)

    2010-07-01

    ..., TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.3-Use and Care of GSA Interagency Fleet Management System Vehicles § 101-39.304 Modification or installation of accessory equipment. The modification of a GSA Interagency Fleet Management System (IFMS) vehicle or the permanent installation of...

  2. How Soldiers Perceive the Drinking Environment in Communities near Military Installations

    Science.gov (United States)

    Besse, Kelsey; Toomey, Traci L.; Hunt, Shanda; Lenk, Kathleen M.; Widome, Rachel; Nelson, Toben F.

    2018-01-01

    Excessive alcohol use among military personnel is a significant concern. A potential contributor to this problem may be alcohol-serving environments around military installations; however, limited information is available about these environments. We conducted focus groups and interviews with Army personnel from two installations regarding soldier…

  3. Last End Cap Toroid installation : The Pharaonic enterprise

    CERN Multimedia

    Arnaud Foussat

    After the successful and impressive transport feat from Building 191 to Point 1 was carried out by the Friderici crew on 28th June, the second and last Toroid End Cap, ECT-C, was transferred into the surface building, SX1, on 2nd July. The ECT-C was installed in the ATLAS cavern on the C-side on 12th July. As the person responsible for the project, in my opinion, one of the crucial points of this project was to design all the tooling and installation sequences taking into account the building infrastructure dimensional constraints. View of the ECT installation tooling and preparation for the ECT-C descent into the ATLAS 80m-shaft by the ATLAS magnet group and DBS teams. The movement of the 240-ton magnet and 12-m diameter toroid end-cap was achieved in collaboration with SCALES, a subcontractor company, using a hydraulic gantry able to lower the ECT inside the shaft by 5m below the floor level . This allowed the DBS team to attach the end-cap with the 2 x 140 tons overhead crane and lower it onto the c...

  4. Design and installation manual for thermal energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M [eds.

    1979-02-01

    The purpose for this manual is to provide information on the design and installation of thermal energy storage in solar heating systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating system, and stand-alone domestic hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  5. Installation of a tandem-type accelerator mass spectrometer

    International Nuclear Information System (INIS)

    Mizushima, Toshihiko; Togawa, Orihiko; Mizutani, Yoshihiko; Yamamoto, Tadatoshi

    2000-02-01

    Tandem-type accelerator mass spectrometer (hereinafter referred to as Tandetron) was installed at the Ominato Facility of Mutsu Establishment, JAERI in April, 1997. The objective of its installation is to investigate the mechanism of the mixing and circulation of seawater in the ocean, by collecting seawater samples around Japan and analyzing the horizontal and vertical distributions of 14 C contained in the samples. The Tandetron consists of two lines to measure isotopic ratios of carbon and those of heavier iodine. The adjustment for the carbon line was finished and the measurements of seawater samples were started. The iodine line, on the other hand, is on the final step of its adjustment and performance tests are being carried out with a TOF (Time of Flight) detector. The iodine line will be used to analyze 129 I released from a spent nuclear fuel reprocessing plant and other nuclear facilities. In this report, we summarize the status of installation of the carbon and iodine lines for the Tandetron. The report describes the situations of their adjustments until now, the outline of the Tandetron, tests of measurement performance, evaluation and inspection of shielding performance, problems and their solutions, and so on. (author)

  6. Volcanic Hazard Assessments for Nuclear Installations: Methods and Examples in Site Evaluation

    International Nuclear Information System (INIS)

    2016-07-01

    To provide guidance on the protection of nuclear installations against the effects of volcanoes, the IAEA published in 2012 IAEA Safety Standards Series No. SSG-21, Volcanic Hazards in Site Evaluation for Nuclear Installations. SSG-21 addresses hazards relating to volcanic phenomena, and provides recommendations and general guidance for evaluation of these hazards. Unlike seismic hazard assessments, models for volcanic hazard assessment have not undergone decades of review, evaluation and testing for suitability in evaluating hazards at proposed nuclear installations. Currently in volcanology, scientific developments and detailed methodologies to model volcanic phenomena are evolving rapidly.This publication provides information on detailed methodologies and examples in the application of volcanic hazard assessment to site evaluation for nuclear installations, thereby addressing the recommendations in SSG-21. Although SSG-21 develops a logical framework for conducting a volcanic hazard assessment, this publication demonstrates the practicability of evaluating the recommendations in SSG-21 through a systematic volcanic hazard assessment and examples from Member States. The results of this hazard assessment can be used to derive the appropriate design bases and operational considerations for specific nuclear installations

  7. First Linac4 DTL & CCDTL cavities installed in tunnel

    CERN Multimedia

    Katarina Anthony

    2014-01-01

    On 5 June, the first Drift Tube Linac (DTL) was successfully transported to its forever home in the Linac4 tunnel. Similarly, the first Cell-Coupled Drift Tube Linac (CCDTL) was installed on 6 June. These moves marked the end of years of design and manufacturing by Linac4 teams.   Although it may seem like a relatively routine transport operation, the DTL's move was a landmark event for the entire Linac4 collaboration. "Along with the first four Cell-Coupled DTL modules, which were installed on the following two working days, these are the first accelerating structures after front-end commissioning to be installed in the tunnel," says Frank Gerigk, who is responsible for all Linac4 accelerating structures. "It is a major milestone, because work on all these structures started well over a decade ago." The transport operation was also quite a victory for the Linac4 DTL team, whose journey to a complete DTL structure has been a bit of a wild ride. &qu...

  8. The suitability and installation of technological equipment when upgrading existing facilities

    Directory of Open Access Journals (Sweden)

    Ladnushkin A. A.

    2016-03-01

    Full Text Available to date, a large number of Russian companies in diverse and various industries, has old equipment and requires modernization of the technological process due to the growth of scientific and technological progress. In order to achieve goals when upgrading is considered such an important aspect as the readiness of the new equipment installation. Mounting hardware suitability describes the suitability and readiness of equipment for efficient Assembly at the user. Replacement of technological equipment requires large volumes of works on installation and dismantling, in the absence of the building has its own lifting mechanisms require large financial and labor costs. One of possible methods for replacement of process equipment is the technology of without crane installation allows us to carry out work in existing space planning. Today is the question of the necessity of development and introduction of new technological production methods and fixtures tooling in which it is possible to conduct installation and dismantling of technological equipment in the operating production process.

  9. Attention and Distraction: On the Aesthetic Experience of Video Installation Art

    Directory of Open Access Journals (Sweden)

    Petersen, Anne Ring

    2010-10-01

    Full Text Available This article aims to examine the interrelationship between attention and distraction in the reception of video installation art, a genre which is commonly associated with "immersion" and an intensified feeling of presence in the discourses on new media art and installation art. This tends to veil the fact that the behaviour of many visitors is characterised by a certain restlessness and distraction. The article suggests that, in contradistinction to traditional disciplines of art like painting and sculpture, video installations seem to stimulate a "reception in distraction" (Walter Benjamin that is at odds with the ideal of a reception in concentration that governs the institutions of fine art as well as aesthetic theory. It intends to demonstrate how the experience of video installation art can only be understood by recognising that the close connections between, on the one hand, video art and, on the other hand, the cultural formations of television, film and computers have fundamentally re-configured "aesthetic experience."

  10. Decreasing the cost of ground grid installations under difficult environmental conditions

    International Nuclear Information System (INIS)

    Miranda, E.P.

    1992-01-01

    The purpose of a ground grid is to provide a means to carry and dissipate electrical currents into ground under normal and fault conditions. In some cases, especially in dry rock terrain, the soil resistivity can be very high, making it difficult and very expensive to install an acceptable ground grid. Usually a soil resistivity above 200 ohm-meter is considered high. This paper discusses and provides design calculations for a successful ground grid installation in a distribution substation located in one of the worst soil conditions encountered in the industry; a very rocky terrain where the resistivity is 1800 ohm-m. It is a practical application of the theories presented in ANSI/IEEE Std. 80-1986. The design application consists of bare copper combined with conventional and a new type of ground rod. The installation cost for this application was much less than the cost associated with that of a conventional installation

  11. Door Hardware and Installations; Carpentry: 901894.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in the selection, preparation, and installation of hardware for door assemblies. The course is divided into five blocks of instruction (introduction to doors and hardware, door hardware, exterior doors and jambs, interior doors and jambs, and a quinmester post-test) totaling…

  12. Seismic evaluation of nuclear installations

    International Nuclear Information System (INIS)

    Mattar Neto, Miguel

    1997-01-01

    Some considerations regarding extreme external events, natural or man-induce, such as earthquakes, floods, air crashes, etc, shall be done for nuclear facilities to minimizing the potential impact of the installation on the public and the environment. In this paper the main aspects of the seismic evaluation of nuclear facilities (except the nuclear power reactors) will be presented based on different codes and standards. (author). 7 refs., 2 tabs

  13. Mounting clips for panel installation

    Science.gov (United States)

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  14. Installing Git under MacOS

    OpenAIRE

    Fitzpatrick, Benjamin

    2015-01-01

    Step by step guide to installing the version control software Git under the Macintosh Operating System MacOS X (and later). Includes a seqeunce of screenshots with hand drawn arrows ;-) These slides are part of the materials for an Introductory course on the R language and environment for statistial computing. Free and Open Source materials for this course hosted on GitHub: https://github.com/brfitzpatrick/Intro_to_R

  15. Solar system installation at Louisville, Kentucky (final report)

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-07

    A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

  16. Two passive groundwater treatment installations at DOE facilities

    International Nuclear Information System (INIS)

    Barton, W.D.; Craig, P.M.; Stone, W.C.

    1997-01-01

    Groundwater is being successfully treated by reactive media at two DOE sites. Passive treatment utilizing containerized treatment media has been installed on a radioactive groundwater seep at Oak Ridge National Lab, Oak Ridge, Tennessee, and on a TCE plume at the Portsmouth Gaseous Diffusion Plant in Piketon, Ohio. In both applications, flow is conducted by gravity through canisters of reactive treatment media. The canister-based treatment installation at ORNL utilizes a natural sodium-chabazite zeolite to remove radiological cations (Sr, Cs) from contaminated groundwater at greater than 99.9% efficiency. Portsmouth is currently conducting tests on three different types of treatment media for reductive dehalogenation of TCE

  17. Caregivers’ Use of Child Passenger Safety Resources and Quality of Future Child Restraint System Installations

    Directory of Open Access Journals (Sweden)

    Jessica H. Mirman

    2017-10-01

    Full Text Available Objectives: Child Restraint System (CRS misuse is common. We characterized caregivers’ use of child passenger safety informational and instructional resources and determined whether there were differences in the quality of CRS installations associated with prior exposure to specific resources as evaluated in a standardized CRS installation environment. Methods: Caregivers completed self-report surveys and installed a forward-facing CRS in a controlled environment. Installations were evaluated for security (tightness and accuracy (no errors by a child passenger safety technician (CPST. Results: CRS manuals were the most common way caregivers learned to install a CRS. Primary care providers (PCPs were the most frequently endorsed source of CRS safety information. There was no strong pattern of associations between prior exposure to resources and installation quality (security or accuracy, although some evidence supports protective effects of learning from CPSTs; 13% (19 out of 151 installations were secure and 57% (86 out of 151 installations were accurate. Conclusions: A focus on developing effective and lasting behavioral interventions is needed.

  18. Post-installation geotechnical issues associated with large-scale HDD crossings

    Energy Technology Data Exchange (ETDEWEB)

    Baumgard, A.; Savigny, K.W. [BGC Engineering, Calgary, AB (Canada); Cocciolo, P. [Terasen Pipelines Inc., Calgary, AB (Canada)

    2004-07-01

    Horizontal directional drilling (HDD) is often used to install pipeline crossings beneath rivers, through mountains, or beneath urban infrastructure. HDD processes can often lead to the development of localized sinkholes and settlement above installed pipelines. This paper provided several examples of the unfavorable ground conditions and HDD installation procedures responsible for the development of sinkholes and settlement. Various mitigation measures designed to prevent both sinkhole and settlement from occurring after HDD installation were also presented. Case studies from 2 large HDD crossings were presented in order to illustrate the potential magnitude of post-HDD sinkholes and settlements at a crossing of the Fraser River located near Vancouver, British Columbia; and at major river crossing in north-central Argentina. Both case studies showed that large sinkholes formed behind HDD exit points, which resulted in property damage and eventually threatened the stability of neighbouring utilities. Triggering factors relating to unfavourable ground conditions included loose soils; compressible ground; fluctuating water tables; and high conductivity soils. Triggering factors relating to HDD installation methods included excessive annulus size; differences in entry/exit point elevation; excessive washing; and excessive circulating pressure. Several remediation options used in the case studies were also discussed, as well as site investigation and design techniques implemented to minimize the potential for sinkhole development. It was concluded that potential sinkhole and settlement triggering factors must be identified as early as possible during the construction and design phases of a project in order to allow for the implementation of mitigation measures. 6 refs., 8 figs.

  19. The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016

    Energy Technology Data Exchange (ETDEWEB)

    OShaughnessy, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-22

    Market structure refers to the number of firms and the distribution of market shares among firms within an industry. In The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016, we examine market structure in the context of residential solar PV. We find that over 8,000 companies have installed at least one residential PV system, with about 2,900 companies active in 2016. The majority of residential PV installers are relatively small companies, with about half of installers installing fewer than five systems. At the same time, a subset of high-volume installers accumulated market share, especially beginning around 2010 with the emergence of alternative customer financing options.

  20. The effect of cleanliness control during installation work on the amount of accumulated dust in ducts of new HVAC installations.

    Science.gov (United States)

    Holopainen, R; Tuomainen, M; Asikainen, V; Pasanen, P; Säteri, J; Seppänen, O

    2002-09-01

    The aim of this study was to evaluate the amount of dust in supply air ducts in recently installed ventilation systems. The samples for the determination of dust accumulation were collected from supply air ducts in 18 new buildings that have been constructed according to two different cleanliness control levels classified as category P1 (low oil residues and protected against contaminations) and category P2, as defined in the Classification of Indoor Climate, Construction and Building Materials. In the ducts installed according to the requirements of cleanliness category P1 the mean amount of accumulated dust was 0.9 g/m2 (0.4-2.9 g/m2), and in the ducts installed according to the cleanliness category P2 it was 2.3 g/m2 (1.2-4.9 g/m2). A significant difference was found in the mean amounts of dust between ducts of categories P1 and P2 (P < 0.008). The cleanliness control procedure in category P1 proved to be a useful and effective tool for preventing dust accumulation in new air ducts during the construction process. Additionally, the ducts without residual oil had lower amounts of accumulated dust indicating that the demand for oil free components in the cleanliness classification is reasonable.

  1. The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016

    Energy Technology Data Exchange (ETDEWEB)

    OShaughnessy, Eric J. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-16

    This study uses data on over 900,000 solar PV installations to summarize the evolving market structure of the U.S. residential solar PV installation industry. Over 8,000 companies have installed residential PV systems in the United States. The vast majority of these installers are small local companies. At the same time, a subset of national-scale high-volume PV installation companies hold high market shares. This study examines the factors behind these trends in market concentration, including the role of customer financing options.

  2. Installed in good engineering practice; Installez dans les regles de l'art

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    This guidelines, presented by the ADEME (Agency for the energy and the environment mastership), proposed recommendations to install a wood burning appliance in the houses. It concerns the choice of an appropriate appliance and its capacity, the installation of an independent appliance, the installation of a wood boiler, the works on existing duct, the regulation and the wood fuel. (A.L.B.)

  3. Investigation And Mitigation Techniques Of Power Quality Problems In Nuclear Installations

    International Nuclear Information System (INIS)

    Ayad, N.; Elsherbiny, E.; Eleissawi, H.; Zaher, M.; AbdelSalam, G.

    2013-01-01

    The electrical power systems are exposed to different types of power quality disturbances problems. Investigation and monitoring of power quality is necessary to maintain accurate operation of sensitive equipment especially for nuclear installations. The present research discusses investigation and monitoring of power quality problems for the electrical sources of nuclear installations. Field power quality data is collected by power analyzer and analyzed with reference to power quality standards. There were several disturbances exceeded the thresholds, they were voltage harmonics and voltage flicker. Mitigation techniques were suggested to install a passive filter at low voltage side and all sensitive and critical loads should be isolated and fed through uninterruptible power supply (UPS)

  4. RF accelerating unit installed in the PSB

    CERN Multimedia

    CERN PhotoLab

    1972-01-01

    RF accelerating unit installed in the PSB ring between two bending magnets. Cool air from a heat exchanger is injected into the four cavities from the central feeder and the hot air recirculated via the lateral ducts.

  5. 30 CFR 77.516 - Electric wiring and equipment; installation and maintenance.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric wiring and equipment; installation and... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.516 Electric wiring and equipment; installation and maintenance. In addition to the requirements of §§ 77.503 and 77.506, all wiring and...

  6. Safety aspects of spent nuclear fuel interim storage installations

    Energy Technology Data Exchange (ETDEWEB)

    Romanato, Luiz Sergio [Centro Tecnologico da Marinha em Sao Paulo (CTMSP), Sao Paulo, SP (Brazil). Dept. da Qualidade. Div. de Sistemas da Qualidade]. E-mail: romanato@ctmsp.mar.mil.br; Rzyski, Barbara Maria [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil). Div. de Ensino]. E-mail: bmrzyski@ipen.br

    2007-07-01

    Nowadays safety and security of spent nuclear fuel (SNF) interim storage installations are very important, due to a great concentration of fission products, actinides and activation products. In this kind of storage it is necessary to consider the physical security. Nuclear installations have become more vulnerable. New types of accidents must be considered in the design of these installations, which in the early days were not considered like: fissile material stolen, terrorists' acts and war conflicts, and traditional accidents concerning the transport of the spent fuel from the reactor to the storage location, earthquakes occurrence, airplanes crash, etc. Studies related to airplane falling had showed that a collision of big commercials airplanes at velocity of 800 km/h against SNF storage and specially designed concrete casks, do not result in serious structural injury to the casks, and not even radionuclides liberation to the environment. However, it was demonstrated that attacks with modern military ammunitions, against metallic casks, are calamitous. The casks could not support a direct impact of this ammo and the released radioactive materials can expose the workers and public as well the local environment to harmful radiation. This paper deals about the main basic aspects of a dry SNF storage installation, that must be physically well protected, getting barriers that difficult the access of unauthorized persons or vehicles, as well as, must structurally resist to incidents or accidents caused by unauthorized intrusion. (author)

  7. Safety aspects of spent nuclear fuel interim storage installations

    International Nuclear Information System (INIS)

    Romanato, Luiz Sergio

    2007-01-01

    Nowadays safety and security of spent nuclear fuel (SNF) interim storage installations are very important, due to a great concentration of fission products, actinides and activation products. In this kind of storage it is necessary to consider the physical security. Nuclear installations have become more vulnerable. New types of accidents must be considered in the design of these installations, which in the early days were not considered like: fissile material stolen, terrorists' acts and war conflicts, and traditional accidents concerning the transport of the spent fuel from the reactor to the storage location, earthquakes occurrence, airplanes crash, etc. Studies related to airplane falling had showed that a collision of big commercials airplanes at velocity of 800 km/h against SNF storage and specially designed concrete casks, do not result in serious structural injury to the casks, and not even radionuclides liberation to the environment. However, it was demonstrated that attacks with modern military ammunitions, against metallic casks, are calamitous. The casks could not support a direct impact of this ammo and the released radioactive materials can expose the workers and public as well the local environment to harmful radiation. This paper deals about the main basic aspects of a dry SNF storage installation, that must be physically well protected, getting barriers that difficult the access of unauthorized persons or vehicles, as well as, must structurally resist to incidents or accidents caused by unauthorized intrusion. (author)

  8. Metrology and quality assurance for European XFEL long flat mirrors installation

    Science.gov (United States)

    Freijo Martín, Idoia; Vannoni, Maurizio; Sinn, Harald

    2017-06-01

    The European XFEL is a large-scale user facility under construction in Hamburg, Germany. It will provide a transversally fully coherent X-ray radiation with outstanding characteristics: high repetition rate (up to 2700 pulses with a 0.6 milliseconds long pulse train at 10Hz), short wavelength (down to 0.05 nm), short pulses (in the femtoseconds scale) and high average brilliance (1.6x1025 photons / s / mm2 / mrad2/ 0.1% bandwidth)1. Due to the short wavelength and high pulse energies, mirrors need to have a high-quality surface, have to be very long (1 m), and at the same time an effective cooling system has to be implemented. Matching these tight specifications and assessing them with high precision optical measurements is very challenging. The mirrors go through a complicated and long process, starting from classical polishing to deterministic polishing, ending with a special coating and a final metrology assessment inside their mechanical mounts just before the installation. The installation itself is also difficult for such big mirrors and needs special care. In this contribution we will explain how we implemented the installation process, how we used the metrology information to optimize the installation procedure and we will show some preliminary results with the first mirrors installed in the European XFEL beam transport.

  9. Code on the safety of civilian nuclear fuel cycle installations

    International Nuclear Information System (INIS)

    1996-01-01

    The 'Code' was promulgated by the National Nuclear Safety Administration (NSSA) on June 17, 1993, which is applicable to civilian nuclear fuel fabrication, processing, storage and reprocessing installations, not including the safety requirements for the use of nuclear fuel in reactors. The contents of the 'Code' involve siting, design, construction, commissioning, operation and decommissioning of fuel cycle installation. The NNSA shall be responsible for the interpretation of this 'Code'

  10. Using Residential Solar PV Quote Data to Analyze the Relationship Between Installer Pricing and Firm Size

    Energy Technology Data Exchange (ETDEWEB)

    O' Shaughnessy, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-05-19

    We use residential solar photovoltaic (PV) quote data to study the role of firm size in PV installer pricing. We find that large installers (those that installed more than 1,000 PV systems in any year from 2013 to 2015) quote higher prices for customer-owned systems, on average, than do other installers. The results suggest that low prices are not the primary value proposition of large installers.

  11. Software safety analysis practice in installation phase

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H. W.; Chen, M. H.; Shyu, S. S., E-mail: hwhwang@iner.gov.t [Institute of Nuclear Energy Research, No. 1000 Wenhua Road, Chiaan Village, Longtan Township, 32546 Taoyuan County, Taiwan (China)

    2010-10-15

    This work performed a software safety analysis in the installation phase of the Lung men nuclear power plant in Taiwan, under the cooperation of Institute of Nuclear Energy Research and Tpc. The US Nuclear Regulatory Commission requests licensee to perform software safety analysis and software verification and validation in each phase of software development life cycle with Branch Technical Position 7-14. In this work, 37 safety grade digital instrumentation and control systems were analyzed by failure mode and effects analysis, which is suggested by IEEE standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The failure mode and effects analysis showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (Author)

  12. Software safety analysis practice in installation phase

    International Nuclear Information System (INIS)

    Huang, H. W.; Chen, M. H.; Shyu, S. S.

    2010-10-01

    This work performed a software safety analysis in the installation phase of the Lung men nuclear power plant in Taiwan, under the cooperation of Institute of Nuclear Energy Research and Tpc. The US Nuclear Regulatory Commission requests licensee to perform software safety analysis and software verification and validation in each phase of software development life cycle with Branch Technical Position 7-14. In this work, 37 safety grade digital instrumentation and control systems were analyzed by failure mode and effects analysis, which is suggested by IEEE standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The failure mode and effects analysis showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (Author)

  13. Managing a major security system installation: Practical lessons learned

    International Nuclear Information System (INIS)

    Roehrig, S.C.

    1986-01-01

    Sandia National Laboratories has been heavily involved for over a decade in aiding a number of DOE facilities in defining and implementing upgraded security safeguards systems. Because security system definition, design, and installation is still a relatively new field to the commercial world, effective project management must pay special attention to first understanding and then interpreting the unique aspects of a security system for all concerned parties. Experiences from an actual security system installation are used to illustrate some project management approaches which have been found to be effective

  14. Licensing procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1976-08-01

    For Belgium and Luxembourg, the authorization procedure varies according to the Class in which the installation concerned falls (assigned according to the degree of hazard involved: Classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of Class I and II installations. With respect to Germany also, two such separate authorization are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the 'basic' nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of 'classified' installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of 'classified' installations exist in the United Kingdom. Moreover, there is only one single authorization (the 'site licence'), which is succesively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  15. Authorization procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1974-12-01

    For Belgium and Luxembourg, the authorization procedure varies according to the class in which the installation concerned falls (assigned according to the degree of hazard involved classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of class I and II installations. With respect to Germany also, two such separate authorizations are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the basic nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of classified installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of classified installations exist in the United Kingdom. Moreover, there is only one single authorization (the site licence), which is successively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  16. Dome load control and crane land path evaluation for Tank 241-SY-101 during hydrogen mitigation pump removal and installation

    Energy Technology Data Exchange (ETDEWEB)

    Weis, M.P.; Lawler, D.M.

    1994-08-01

    This report revisits and consolidates two analyses previously performed for the installation of the Hydrogen Mitigation Pump (HMT) pump. The first report determines, as a function of the crane-imposed dome load, the point to which the crane can encroach into the exclusion zone without exceeding the 50-ton limit. The second performs a load evaluation for the crane and the components in the load path (crane lift accessories and pump). In doing so, it determines the weakest component in the load path and the effect of this component on the allowable encroachment distance. Furthermore, the second report sets operational limits on the allowable load decrease (unload) during installation in the event the pump sticks in the riser. The analysis presented here expands on the latter subject by setting an operational limit on the amount of allowable load increase (overload) during pump removal in the event the pump sticks in the riser.

  17. 78 FR 57253 - Airworthiness Directives; Honeywell ASCa Inc. Emergency Locator Transmitters Installed on Various...

    Science.gov (United States)

    2013-09-18

    ... detect and correct discrepancies of the battery wiring installation inside the TU, which could result in... TUs revealed battery wiring installation discrepancies inside the TU that may result in an electrical... fire due to wiring installation discrepancies of either the ELT TU or the ELT Battery. Depending on the...

  18. Investigation on Prefabricated Building System Skilled Component Installers

    Directory of Open Access Journals (Sweden)

    Nurul Rezuana Buyung

    2013-09-01

    Full Text Available In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precision and needs a higher skill level of workers. Compared to the conventional construction method, the skill level of IBS workers is more demanding. Although there are a lot benefits in implementing IBS, the construction industry still not rapidly implementing IBS. The IBS method still considered new and even though there are a lot of benefits it still faces barriers. In an IBS construction, the role of the contractor is shifted from a builder to an assembler on the site. Therefore, this requires the contractor to be prepared technologically with IBS knowledge and skills. It is generally perceived that the number of skilled IBS installers in Malaysia is still low even though the system has been implemented for a long time. This research is carried out to find out whether the existing number of IBS installer is sufficient. Primary data was collected by carrying out interviews with the contractors at the IBS construction site in Penang Island in order to get the contractor’s feedback regarding this issue. Meanwhile, the secondary data was collected from government agencies to get the number of existing IBS installer and the number of IBS projects done in government projects. The results from this study indicated that not all categories of skill workers are in shortage. However, the number of precast concrete installer is in a critical shortage.

  19. Planning and acceptance testing of MV therapy installations

    International Nuclear Information System (INIS)

    Almond, Peter R.; Horton, John L.

    1995-01-01

    Purpose: This course is designed for practitioners and beginners in brachytherapy. The aim is to review biological principles equipment are aware of all aspects involved. The object is to cover in a broad overview the considerations that go into selecting, installing, testing and accepting megavoltage therapy equipment and to provide a resource for more detailed information. Planning and acceptance testing of a megavoltage therapy installation is a major undertaking for any size group, institution or department. It can take approximately two years from the time a decision is made to get a machine to where the first patient is treated. Because the equipment and site preparation are expensive, and most of the machines are complex and can be supplied by several different manufacturers, it is imperative that a great deal of thought and care go into the decision: the aim being that the specifications of the machine that is installed meet the immediate need of the department and the needs for the projected lifetime of the equipment. A general survey of the types of equipment available will be presented. This will concentrate on general purpose linear accelerators, although Cobalt 60 machines, microtrons and special purpose machines (intra-operative equipment) will also be covered. General descriptions of the machines along with typical specifications will be given. Selecting the best machine to meet specific needs can be quite complex and criteria for making the selection are presented in a series of twelve steps. site selection and room design, including the console area, are also critical. The general principles for shielding calculations will be provided. Critical to any installation is the acceptance testing of the equipment including material and radiation oncology performance tests. These tests will be outlined. A reading list of suitable references describing in detail many of the aspects of this course will be provided

  20. Installation of the ALICE dipole magnet

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The large dipole magnet is installed on the ALICE detector at CERN. This magnet, which is cooled by demineralised water, will bend the path of muons that leave the huge rectangular solenoid (in the background). These muons are heavy electrons that interact less with matter, allowing them to traverse the main section of the detector.