WorldWideScience

Sample records for previously approved closure

  1. 75 FR 54215 - Agency Request for Approval of a Previously Approved Information Collection(s): Uniform...

    Science.gov (United States)

    2010-09-03

    ... about our intention to request Office of Management and Budget (OMB) approval to renew a previously... because of management and oversight responsibilities of the agency imposed by OMB Circular 2 CFR 215 (A... Department has terminated Financial Status Report (SF-269 and SF-269A) and Federal Cash Transactions Report...

  2. 77 FR 22384 - Petition To Modify an Exemption of a Previously Approved Antitheft Device; Porsche

    Science.gov (United States)

    2012-04-13

    ... vehicle with the driver. The key contains a radio signal transponder which signals the control unit to... DEPARTMENT OF TRANSPORTATION National Highway Traffic Safety Administration Petition To Modify an Exemption of a Previously Approved Antitheft Device; Porsche AGENCY: National Highway Traffic Safety...

  3. 75 FR 70067 - Notice of Request for Reinstatement of Previously Approved Information Collection

    Science.gov (United States)

    2010-11-16

    ... address for which the public should request further information related to the relevant Information... Request for Reinstatement of Previously Approved Information Collection ACTION: Notice; Correction SUMMARY... INFORMATION CONTACT: Robert C. Ashby, Office of the Secretary, Office of Assistant General Counsel for...

  4. FDA Approval: Ibrutinib for Patients with Previously Treated Mantle Cell Lymphoma and Previously Treated Chronic Lymphocytic Leukemia.

    Science.gov (United States)

    de Claro, R Angelo; McGinn, Karen M; Verdun, Nicole; Lee, Shwu-Luan; Chiu, Haw-Jyh; Saber, Haleh; Brower, Margaret E; Chang, C J George; Pfuma, Elimika; Habtemariam, Bahru; Bullock, Julie; Wang, Yun; Nie, Lei; Chen, Xiao-Hong; Lu, Donghao Robert; Al-Hakim, Ali; Kane, Robert C; Kaminskas, Edvardas; Justice, Robert; Farrell, Ann T; Pazdur, Richard

    2015-08-15

    On November 13, 2013, the FDA granted accelerated approval to ibrutinib (IMBRUVICA capsules; Pharmacyclics, Inc.) for the treatment of patients with mantle cell lymphoma (MCL) who have received at least one prior therapy. On February 12, 2014, the FDA granted accelerated approval for the treatment of patients with chronic lymphocytic leukemia (CLL) who have received at least one prior therapy. Ibrutinib is a first-in-class Bruton's tyrosine kinase (BTK) inhibitor that received all four expedited programs of the FDA: Fast-Track designation, Breakthrough Therapy designation, Priority Review, and Accelerated Approval. Both approvals were based on overall response rate (ORR) and duration of response (DOR) in single-arm clinical trials in patients with prior treatment. In MCL (N = 111), the complete and partial response rates were 17.1% and 48.6%, respectively, for an ORR of 65.8% [95% confidence interval (CI), 56.2%-74.5%]. The median DOR was 17.5 months (95% CI, 15.8-not reached). In CLL (N = 48), the ORR was 58.3% (95% CI, 43.2%-72.4%), and the DOR ranged from 5.6 to 24.2 months. The most common adverse reactions (≥ 30% in either trial) were thrombocytopenia, diarrhea, neutropenia, bruising, upper respiratory tract infection, anemia, fatigue, musculoskeletal pain, peripheral edema, and nausea. ©2015 American Association for Cancer Research.

  5. 78 FR 77203 - Agency Requests for Renewal of a Previously Approved Information Collection(s): War Risk...

    Science.gov (United States)

    2013-12-20

    ... Previously Approved Information Collection(s): War Risk Insurance, Applications and Related Information... determine the eligibility of the applicant and the vessel(s) for participation in the war risk insurance... Control Number: 2133-0011. Title: War Risk Insurance, Applications and Related Information. Form Numbers...

  6. 75 FR 50036 - Petition To Modify an Exemption of a Previously Approved Antitheft Device; Ford Motor Company

    Science.gov (United States)

    2010-08-16

    ... Exemption of a Previously Approved Antitheft Device; Ford Motor Company AGENCY: National Highway Traffic..., the National Highway Traffic Safety Administration (NHTSA) granted in full Ford Motor Company's (Ford... Prevention Standard for the Ford Focus vehicle line beginning with model year (MY 2006). On June 18, 2010...

  7. 77 FR 35112 - Petition To Modify an Exemption of a Previously Approved Antitheft Device; Ford Motor Company

    Science.gov (United States)

    2012-06-12

    ... Exemption of a Previously Approved Antitheft Device; Ford Motor Company AGENCY: National Highway Traffic... Traffic Safety Administration (NHTSA) granted in full Ford Motor Company's (Ford) petition for an... Standard for the Ford Fusion vehicle line beginning with its model year (MY) 2012 vehicles. On February 16...

  8. 77 FR 59242 - Extension of a Previously Approved Collection; Public Charters

    Science.gov (United States)

    2012-09-26

    ... previous notice. DATES: Comments on this notice should be received by October 26, 2012: attention OMB/OST... operator's advertising, selling or operating the charter. If the prospectus information were not collected...

  9. Delayed flap coverage of open extremity fractures after previous vacuum-assisted closure (VAC) therapy - worse or worth?

    Science.gov (United States)

    Steiert, Andreas E; Gohritz, Andreas; Schreiber, Thomas C; Krettek, Christian; Vogt, Peter M

    2009-05-01

    Controversy remains regarding timing in the management of complex traumatic lower extremity defects. Many authors recommend a definitive bony and soft tissue reconstruction within a critical period of 72 h, yet in many patients this may be impossible due to concomitant injuries or delayed referral. However, little data are available on the results of delayed flap reconstruction of complex traumatic extremity defects, especially using new technologies of wound coverage such as vacuum-assisted closure (VAC((R))) therapy which may reduce the disadvantages of conventional open wound therapy prior to a subsequent flap reconstruction. We retrospectively analysed the soft tissue reconstructions in 43 open extremity fractures during a 4-year period with special regard to complications, overall flap loss and wound infection. A total of 29 male and 13 female patients with 33 open fractures of the lower and 10 of the upper extremity were included. All patients had been referred from a trauma centre at a mean interval of 19 days (range 1-96 days) after the trauma event with temporary VAC((R)) of their wounds after initial fracture fixation and initial debridement of necrotic tissue. Flap reconstruction was thus only possible later than 72 h and definitive wound closure was achieved at a mean time of 28 days (range 3-106 days). Overall, three pedicled flaps were lost and one of 38 microsurgical free flaps (2.6%) underwent necrosis, the cause of which was unrelated to treatment delay. According to this study, the flap reconstructions performed beyond the frequently quoted critical interval yielded similar results to those of immediate reconstruction within the first 3 days, as reported in the literature. This strategy is in accordance with the principles of 'Damage Control Orthopaedics (DCO)' and may reduce the importance of emergency reconstructions, especially in poly-traumatised patients.

  10. Full closure strategic analysis.

    Science.gov (United States)

    2014-07-01

    The full closure strategic analysis was conducted to create a decision process whereby full roadway : closures for construction and maintenance activities can be evaluated and approved or denied by CDOT : Traffic personnel. The study reviewed current...

  11. Spontaneous, late, in-the-bag intraocular lens subluxation in a patient with a previous acute angle-closure glaucoma attack.

    Science.gov (United States)

    Su, Wei-Wen; Chang, Shirley H L

    2004-08-01

    Cataract surgery was performed in a 49-year-old woman 16 months after an acute angle-closure glaucoma attack. Zonular dialysis was observed during surgery, but the intraocular lens (IOL) was implanted in the capsular bag uneventfully. At 4 1/2 months, 1 IOL loop wrapped in the bag herniated into the anterior chamber. The patient had no history of trauma. The IOL loop remained in the anterior chamber for 9 months, until the subluxated IOL spontaneously returned to its original position. Six months later, the IOL again dislocated into the anterior chamber.

  12. Road Closures

    Data.gov (United States)

    Montgomery County of Maryland — This is an up to date map of current road closures in Montgomery County.This dataset is updated every few minutes from the Department of Transportation road closure...

  13. Closure requirements

    International Nuclear Information System (INIS)

    Hutchinson, I.P.G.; Ellison, R.D.

    1992-01-01

    Closure of a waste management unit can be either permanent or temporary. Permanent closure may be due to: economic factors which make it uneconomical to mine the remaining minerals; depletion of mineral resources; physical site constraints that preclude further mining and beneficiation; environmental, regulatory or other requirements that make it uneconomical to continue to develop the resources. Temporary closure can occur for a period of several months to several years, and may be caused by factors such as: periods of high rainfall or snowfall which prevent mining and waste disposal; economic circumstances which temporarily make it uneconomical to mine the target mineral; labor problems requiring a cessation of operations for a period of time; construction activities that are required to upgrade project components such as the process facilities and waste management units; and mine or process plant failures that require extensive repairs. Permanent closure of a mine waste management unit involves the provision of durable surface containment features to protect the waters of the State in the long-term. Temporary closure may involve activities that range from ongoing maintenance of the existing facilities to the installation of several permanent closure features in order to reduce ongoing maintenance. This paper deals with the permanent closure features

  14. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA

    2006-09-01

    This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  15. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): (sm b ullet) CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536 Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure

  16. Restaurant closures

    CERN Document Server

    Novae Restauration

    2012-01-01

    Christmas Restaurant closures Please note that the Restaurant 1 and Restaurant 3 will be closed from Friday, 21 December at 5 p.m. to Sunday, 6 January, inclusive. They will reopen on Monday, 7 January 2013.   Restaurant 2 closure for renovation To meet greater demand and to modernize its infrastructure, Restaurant 2 will be closed from Monday, 17 December. On Monday, 14 January 2013, Sophie Vuetaz’s team will welcome you to a renovated self-service area on the 1st floor. The selections on the ground floor will also be expanded to include pasta and pizza, as well as snacks to eat in or take away. To ensure a continuity of service, we suggest you take your break at Restaurant 1 or Restaurant 3 (Prévessin).

  17. Closure certification report: TA-35 TSL-125 surface impoundment

    International Nuclear Information System (INIS)

    1991-01-01

    This closure report documents closure activities for the TA-35 TSL-125 surface impoundment and associated structures at Los Alamos National Laboratory (the Laboratory). Prior to formal approval of the closure plan, the decision was made to proceed with closure activities to prevent any further releases from the site following informal discussions with New Mexico Environment Department (NMED) personnel. The closure plan is a revision of the previously submitted draft dated July 1988. Clean closure of the TSL-125 site was accomplished through: Removal and proper disposal of all wastes contained within the surface impoundment system; Decontamination and/or removal and proper disposal of the surface impoundment, its associated structures, and contaminated soil underlying the impoundment area; Sampling and analysis of soil to determine the presence and concentrations of any hazardous constituents remaining in the soil at the TSL-125 site; and Demonstration through a risk assessment that any constituents remaining in the soil at the TSL-125 site pose no threat to human health and the environment. All remaining soil concentrations of hazardous constituents were below health-based action levels. Analytical results indicated that benzidine, n-nitrosodimethylamine, and n-nitrosodi-n-propylamine were not detected at or above their limits of quantitation and beryllium was not present at or above its laboratory detection limit. However, the limits of quantitation and detection for these constituents were greater than their calculated health-based action levels. To demonstrate that these constituents were not present, historical data was researched and it was determined that the constituents were not utilized at the Building 125 site. 4 refs., 8 figs., 1 tab

  18. Oral Paracetamol for Patent Ductus Arteriosus Rescue Closure.

    Science.gov (United States)

    Pharande, Pramod; Watson, Hadley; Tan, Kenneth; Sehgal, Arvind

    2018-01-01

    The objective of this study was to ascertain the efficacy of oral paracetamol in closing a symptomatic patent ductus arteriosus (PDA) when used as 'rescue' option. After obtaining ethics approval, a retrospective appraisal of the data from April 2014 to July 2015 was performed. Infants who were administered oral paracetamol either after unsuccessful therapy with ibuprofen or where it was considered contraindicated were included. A previously published echocardiographic scoring schema to stratify for ductal disease severity was used. Using univariate analysis, characteristics of infants with successful closure were compared with partial (a priori reduction in composite score by ≥ 50% of pretreatment) or no closure. Twenty infants with gestation age and birthweight of 25.7 ± 1.5 weeks and 724.1 ± 143 g, respectively, were studied. Complete closure was noted in 10 (50%) infants with additional four infants showing a significant reduction in haemodynamic shunting. Gestational age at birth and at therapy, chronological age at therapy, birthweight and total fluid intake were comparable between the two groups. The pre-therapy composite score had a significant association with successful closure (the higher the echocardiographic score, the lesser the closure). Concomitant furosemide therapy and late-onset sepsis had a high likelihood ratio of unsuccessful closure (11.01 [2-tailed, p = 0.005] and 5.3 [2-tailed, p = 0.07]), respectively. Oral paracetamol may be a possible therapeutic option in premature infants where therapy with first-line agents is unsuccessful or contraindicated. Concomitant sepsis and furosemide administration may affect successful therapy.

  19. RELAP-7 Closure Correlations

    Energy Technology Data Exchange (ETDEWEB)

    Zou, Ling [Idaho National Lab. (INL), Idaho Falls, ID (United States); Berry, R. A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Martineau, R. C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Andrs, D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Zhang, H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hansel, J. E. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Sharpe, J. P. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Johns, Russell C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-04-01

    The RELAP-7 code is the next generation nuclear reactor system safety analysis code being developed at the Idaho National Laboratory (INL). The code is based on the INL’s modern scientific software development framework, MOOSE (Multi-Physics Object Oriented Simulation Environment). The overall design goal of RELAP-7 is to take advantage of the previous thirty years of advancements in computer architecture, software design, numerical integration methods, and physical models. The end result will be a reactor systems analysis capability that retains and improves upon RELAP5’s and TRACE’s capabilities and extends their analysis capabilities for all reactor system simulation scenarios. The RELAP-7 code utilizes the well-posed 7-equation two-phase flow model for compressible two-phase flow. Closure models used in the TRACE code has been reviewed and selected to reflect the progress made during the past decades and provide a basis for the colure correlations implemented in the RELAP-7 code. This document provides a summary on the closure correlations that are currently implemented in the RELAP-7 code. The closure correlations include sub-grid models that describe interactions between the fluids and the flow channel, and interactions between the two phases.

  20. Sternal exploration or closure

    Science.gov (United States)

    VAC - vacuum-assisted closure - sternal wound; Sternal dehiscence; Sternal infection ... in the wound to look for signs of infection Remove dead or infected ... use a VAC (vacuum-assisted closure) dressing. It is a negative ...

  1. Closure The Definitive Guide

    CERN Document Server

    Bolin, Michael

    2010-01-01

    If you're ready to use Closure to build rich web applications with JavaScript, this hands-on guide has precisely what you need to learn this suite of tools in depth. Closure makes it easy for experienced JavaScript developers to write and maintain large and complex codebases -- as Google has demonstrated by using Closure with Gmail, Google Docs, and Google Maps. Author and Closure contributor Michael Bolin has included numerous code examples and best practices, as well as valuable information not available publicly until now. You'll learn all about Closure's Library, Compiler, Templates, tes

  2. A RCRA clean closure of a unique site - Kerr Hollow quarry at the Y-12 Plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Yemington, C.

    1991-01-01

    An abandoned rock quarry, Kerr Hollow Quarry (KHQ), near the DOE Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, was used from 1951-1988 as a site to treat RCRA wastes which were reactive, corrosive, or ignitable and which posed major concerns for personnel safety. The wastes were generated from operations at the Y-12 Plant and Oak Ridge National Laboratory and were previously treated by allowing the wastes to react with the water in KHQ. When closure of the site was required by the RCRA regulations, a closure method was selected to allow for clean closure of the quarry without treatment or removal of the water in KHQ. The method proposed to and approved by the Tennessee Department of Health and Environment (TDHE) was one of surveying the containers in the quarry by a submersible Remotely Operated Vehicle (ROV) using sonar and visually inspecting the containers by camera to confirm that all containers are breached and empty. Any container found intact would be breached to allow the contents to react with water and form non-hazardous residue. The progress of this unique type of closure is presented along with a summary of the problems encountered, planning activities, equipment utilized and other information about the closure. All work was done with remotely operated equipment. This work is being performed by Sonsub, Inc. This closure project showed the practicality and cost benefits of telerobotic systems for work on hazardous waste sites. In addition to the intangible benefit of reduced exposure of workers, insurance costs are much lower and efficiency is higher. Daily start-up time is reduced since there is no need to don protective suits or other gear. Productivity is higher since personnel work only in clean areas where they are not hampered by protective gear. Cleanup time at shift end is minimized since the remote equipment does not leave the hazardous area and personnel need not go through decontamination

  3. Resource Conservation and Recovery Act (RCRA) closure sumamry for the Uranium Treatment Unit

    International Nuclear Information System (INIS)

    1996-05-01

    This closure summary has been prepared for the Uranium Treatment Unit (UTU) located at the Y-12 Plant in Oak Ridge, Tennessee. The actions required to achieve closure of the UTU area are outlined in the Closure Plan, submitted to and approved by the Tennessee Department of Environmental and Conservation staff, respectively. The UTU was used to store and treat waste materials that are regulated by the Resource Conservation and Recovery Act. This closure summary details all steps that were performed to close the UTU in accordance with the approved plan

  4. The collision of healthcare and corporate law in a hospital closure case.

    Science.gov (United States)

    Himes, S M

    2001-01-01

    This Article analyzes potential conflicts that arise from both the judicial and administrative approval processes that govern the closure of charitable hospitals through a sale of all or substantially all of their assets. Examining the recent closure attempt by the Manhattan Eye, Ear & Throat Hospital as an example, the Article highlights the various public health and corporate law issues that are raised when a not-for-profit hospital seeks closure. The Article thoroughly discusses both the statutorily and judicially required approval schemes applicable to the closure of charitable hospitals. The Article also suggests ways in which these conflicts might be avoided or remedied, as well as gives advice regarding hospital board decisionmaking.

  5. Tubular closure device

    International Nuclear Information System (INIS)

    Klahn, F.C.; Nolan, J.H.; Wills, C.

    1982-01-01

    This invention relates to a closure mechanism for closing openings such as the bore of a conduit and for releasably securing members within the bore. More particularly, this invention relates to a closure mechanism for tubular irradiation surveillance specimen assembly holders used in nuclear reactors

  6. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as

  7. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2008-01-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as

  8. Eyelid closure at death

    Directory of Open Access Journals (Sweden)

    A D Macleod

    2009-01-01

    Full Text Available Aim: To observe the incidence of full or partial eyelid closure at death. Materials and Methods: The presence of ptosis was recorded in 100 consecutive hospice patient deaths. Results: Majority (63% of the patients died with their eyes fully closed, however, 37% had bilateral ptosis at death, with incomplete eye closure. In this study, central nervous system tumor involvement and/or acute hepatic encephalopathy appeared to be pre-mortem risk factors of bilateral ptosis at death. Conclusion: Organicity and not psychogenicity is, therefore, the likely etiology of failure of full eyelid closure at death.

  9. Special closures for steel drum shipping containers

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Otts, J.V.

    1976-01-01

    The objective of this program was to develop special lid closures for typical, steel drum, radioactive material shipping containers. Previous experience and testing had shown that the existing container was adequate to withstand the required environmental tests for certification, but that the lid and closure were just marginally effective. Specifically, the lid closure failed to consistently maintain a tight seal between the container and the lid after drop tests, thus causing the package contents to be vulnerable in the subsequent fire test. Recognizing the deficiency, the United States Energy Research and Development Administration requested the development of new closure(s) which would: (1) be as strong and resistant to a drop as the bottom of the container; (2) have minimal economic impact on the overall container cost; (3) maximize the use of existing container designs; (4) consider crush loads; and (5) result in less dependence on personnel and loading procedures. Several techniques were evaluated and found to be more effective than the standard closure mechanism. Of these, three new closure techniques were designed, fabricated, and proven to be structurally adequate to provide containment when a 454-kg drum was drop tested from 9.14-m onto an unyielding surface. The three designs were: (1) a 152-mm long lid extension or skirt welded to the standard drum lid, (2) a separate inner lid, with 152-mm long skirt and (3) C-clamps used at the container-lid interface. Based upon structural integrity, economic impact, and minimal design change, the lid extension is the recommended special closure

  10. RCRA corrective action and closure

    International Nuclear Information System (INIS)

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators' interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE's permitted facilities and interim status facilities

  11. Scope and closures

    CERN Document Server

    Simpson, Kyle

    2014-01-01

    No matter how much experience you have with JavaScript, odds are you don’t fully understand the language. This concise yet in-depth guide takes you inside scope and closures, two core concepts you need to know to become a more efficient and effective JavaScript programmer. You’ll learn how and why they work, and how an understanding of closures can be a powerful part of your development skillset.

  12. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... mail. In addition, for facilities without approved post-closure plans, it must also be provided during... requirements. At the end of the specified period of suspension, the Regional Ad-min-is-tra-tor would then...

  13. 78 FR 59731 - License Amendment Request for Closure of Calcium Fluoride Ponds at Honeywell Metropolis Works...

    Science.gov (United States)

    2013-09-27

    ... Closure of Calcium Fluoride Ponds at Honeywell Metropolis Works, Honeywell International, Inc. AGENCY... Federal Regulations (10 CFR) to approve the closure of the calcium fluoride ponds in-place, by... areas: Land use; transportation; geology, soils and seismology; hydrology; ecological resources; air...

  14. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal

  15. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal

  16. Tubular closure mechanism

    International Nuclear Information System (INIS)

    Kalen, D.D.; Mitchem, J.W.

    1982-01-01

    This invention relates to a closure mechanism for tubular irradiation surveillance specimen assembly holder used in nuclear reactors. The closure mechanism is composed of a latching member which includes a generally circular chamber with a plurality of elongated latches depending therefrom. The latching member circumscribes part of an actuator member which is disposed within the latching member so as to be axially movable. The axial movement of the actuator actuates positioning of the latches between positions in which the latches are locked and secured within the actuator member. Means, capable of being remotely manipulated, are provided to move the actuator in order to position the latches and load the articles within the tube

  17. Tank closure reducing grout

    International Nuclear Information System (INIS)

    Caldwell, T.B.

    1997-01-01

    A reducing grout has been developed for closing high level waste tanks at the Savannah River Site in Aiken, South Carolina. The grout has a low redox potential, which minimizes the mobility of Sr 90 , the radionuclide with the highest dose potential after closure. The grout also has a high pH which reduces the solubility of the plutonium isotopes. The grout has a high compressive strength and low permeability, which enhances its ability to limit the migration of contaminants after closure. The grout was designed and tested by Construction Technology Laboratories, Inc. Placement methods were developed by the Savannah River Site personnel

  18. Stomal Closure: Strategies to Prevent Incisional Hernia

    Science.gov (United States)

    Harries, Rhiannon L.; Torkington, Jared

    2018-01-01

    Incisional hernias following ostomy reversal occur frequently. Incisional hernias at the site of a previous stoma closure can cause significant morbidity, impaired quality of life, lead to life-threatening hernia incarceration or strangulation and result in a significant financial burden on health care systems Despite this, the evidence base on the subject is limited. Many recognised risk factors for the development of incisional hernia following ostomy reversal are related to patient factors such as age, malignancy, diabetes, COPD, hypertension and obesity, and are not easily correctable. There is a limited amount of evidence to suggest that prophylactic mesh reinforcement may be of benefit to reduce the post stoma closure incisional hernia rate but a further large scale randomised controlled trial is due to report in the near future. There appears to be weak evidence to suggest that surgeons should favour circular, or “purse-string” closure of the skin following stoma closure in order to reduce the risk of SSI, which in turn may reduce incisional hernia formation. There remains the need for further evidence in relation to suture technique, skin closure techniques, mechanical bowel preparation and oral antibiotic prescription focusing on incisional hernia development as an outcome measure. Within this review, we discuss in detail the evidence base for the risk factors for the development of, and the strategies to prevent ostomy reversal site incisional hernias. PMID:29670882

  19. Stomal Closure: Strategies to Prevent Incisional Hernia

    Directory of Open Access Journals (Sweden)

    Rhiannon L. Harries

    2018-04-01

    Full Text Available Incisional hernias following ostomy reversal occur frequently. Incisional hernias at the site of a previous stoma closure can cause significant morbidity, impaired quality of life, lead to life-threatening hernia incarceration or strangulation and result in a significant financial burden on health care systems Despite this, the evidence base on the subject is limited. Many recognised risk factors for the development of incisional hernia following ostomy reversal are related to patient factors such as age, malignancy, diabetes, COPD, hypertension and obesity, and are not easily correctable. There is a limited amount of evidence to suggest that prophylactic mesh reinforcement may be of benefit to reduce the post stoma closure incisional hernia rate but a further large scale randomised controlled trial is due to report in the near future. There appears to be weak evidence to suggest that surgeons should favour circular, or “purse-string” closure of the skin following stoma closure in order to reduce the risk of SSI, which in turn may reduce incisional hernia formation. There remains the need for further evidence in relation to suture technique, skin closure techniques, mechanical bowel preparation and oral antibiotic prescription focusing on incisional hernia development as an outcome measure. Within this review, we discuss in detail the evidence base for the risk factors for the development of, and the strategies to prevent ostomy reversal site incisional hernias.

  20. Closure report for CAU 93: Area 6 steam cleaning effluent ponds, Nevada Test Site. Volume 1

    International Nuclear Information System (INIS)

    1997-12-01

    The Steam Cleaning Effluent Ponds (SCEP) waste unit is located in Area 6 at the Nevada Test Site. The SCEPs are evaporation basins formerly used for the disposal of untreated liquid effluent discharged from steam cleaning activities associated with Buildings 6-623 and 6-800. This closure report documents the strategy and analytical results that support the clean closure or closure in place of each of the components within CAU 93. In addition, the report documents all deviations from the approved closure plan and provides rationale for all deviations

  1. Professional Closure Beyond State Authorization

    Directory of Open Access Journals (Sweden)

    Gitte Sommer Harrits

    2014-03-01

    Full Text Available For decades, the Weberian approach to the study of professions has been strong, emphasizing state authorization and market monopolies as constituting what is considered a profession. Originally, however, the Weberian conception of closure, or the ways in which a profession is constituted and made separate, was broader. This article suggests a revision of the closure concept, integrating insights from Pierre Bourdieu, and conceptualizing professional closure as the intersection of social, symbolic and legal closure. Based on this revision, this article demonstrates how to apply such a concept in empirical studies. This is done by exploring social, symbolic and legal closure across sixteen professional degree programs. The analyses show a tendency for some overlap between different forms of closure, with a somewhat divergent pattern for legal closure. Results support the argument that we need to study these processes as an intersection of different sources of closure, including capital, lifestyles and discourse

  2. MNC Subsidiary Closures

    DEFF Research Database (Denmark)

    Sofka, Wolfgang; Torres Preto, Miguel; de Faria, Pedro

    2014-01-01

    We investigate the consequences of MNC subsidiary closures for employees who lose their jobs. In particular, we examine the extent to which the human capital that these employees acquired while employed by the MNC influences the wages they receive in their new jobs. We propose an employee...

  3. Friction or Closure

    DEFF Research Database (Denmark)

    Lundahl, Mikela

    2014-01-01

    Heritage is a discourse that aims at closure. It fixates the narrative of the past through the celebration of specific material (or sometimes immaterial non-) ob-jects. It organizes temporality and construct events and freezes time. How does this unfold in the case of the UNESCO World Heritage si...

  4. Mail Office annual closure

    CERN Multimedia

    2013-01-01

    On the occasion of the annual closure of CERN, there will be no mail distributed on Friday 20 December 2013 but mail will be collected in the morning. Nevertheless, you will still be able to bring your outgoing mail to Building 555-R-002 until 12 noon.  

  5. Ring closure in actin polymers

    Energy Technology Data Exchange (ETDEWEB)

    Sinha, Supurna, E-mail: supurna@rri.res.in [Raman Research Institute, Bangalore 560080 (India); Chattopadhyay, Sebanti [Doon University, Dehradun 248001 (India)

    2017-03-18

    We present an analysis for the ring closure probability of semiflexible polymers within the pure bend Worm Like Chain (WLC) model. The ring closure probability predicted from our analysis can be tested against fluorescent actin cyclization experiments. We also discuss the effect of ring closure on bend angle fluctuations in actin polymers. - Highlights: • Ring closure of biopolymers. • Worm like chain model. • Predictions for experiments.

  6. CIRSE Vascular Closure Device Registry

    NARCIS (Netherlands)

    Reekers, Jim A.; Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2011-01-01

    Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. The CIRSE registry of closure devices

  7. Crack closure, a literature study

    Science.gov (United States)

    Holmgren, M.

    1993-08-01

    In this report crack closure is treated. The state of the art is reviewed. Different empirical formulas for determining the crack closure are compared with each other, and their benefits are discussed. Experimental techniques for determining the crack closure stress are discussed, and some results from fatigue tests are also reported. Experimental data from the literature are reported.

  8. Post-Closure Inspection Report for Corrective Action Unit 424: Area 3 Landfill Complexes Tonopah Test Range, Nevada Calendar Year 2001; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2002-01-01

    Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of eight Corrective Action Sites (CASs), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the general location of the landfill cells. Figure 2 shows in more detail the location of the eight landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan, contained in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complexes, Tonopah Test Range, Nevada, report number DOE/NV-283, July 1999. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 424 consists of the following: (1) Site inspections conducted twice a year to evaluate the condition of the unit. (2) Verification that landfill markers and warning signs are in-place, intact, and readable. (3) Notice of any subsidence, erosion, unauthorized use, or deficiencies that may compromise the integrity of the landfill covers. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 16, 2001, and November 6, 2001. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in

  9. Hamiltonian closures in fluid models for plasmas

    Science.gov (United States)

    Tassi, Emanuele

    2017-11-01

    This article reviews recent activity on the Hamiltonian formulation of fluid models for plasmas in the non-dissipative limit, with emphasis on the relations between the fluid closures adopted for the different models and the Hamiltonian structures. The review focuses on results obtained during the last decade, but a few classical results are also described, in order to illustrate connections with the most recent developments. With the hope of making the review accessible not only to specialists in the field, an introduction to the mathematical tools applied in the Hamiltonian formalism for continuum models is provided. Subsequently, we review the Hamiltonian formulation of models based on the magnetohydrodynamics description, including those based on the adiabatic and double adiabatic closure. It is shown how Dirac's theory of constrained Hamiltonian systems can be applied to impose the incompressibility closure on a magnetohydrodynamic model and how an extended version of barotropic magnetohydrodynamics, accounting for two-fluid effects, is amenable to a Hamiltonian formulation. Hamiltonian reduced fluid models, valid in the presence of a strong magnetic field, are also reviewed. In particular, reduced magnetohydrodynamics and models assuming cold ions and different closures for the electron fluid are discussed. Hamiltonian models relaxing the cold-ion assumption are then introduced. These include models where finite Larmor radius effects are added by means of the gyromap technique, and gyrofluid models. Numerical simulations of Hamiltonian reduced fluid models investigating the phenomenon of magnetic reconnection are illustrated. The last part of the review concerns recent results based on the derivation of closures preserving a Hamiltonian structure, based on the Hamiltonian structure of parent kinetic models. Identification of such closures for fluid models derived from kinetic systems based on the Vlasov and drift-kinetic equations are presented, and

  10. A kinematic view of loop closure.

    Science.gov (United States)

    Coutsias, Evangelos A; Seok, Chaok; Jacobson, Matthew P; Dill, Ken A

    2004-03-01

    We consider the problem of loop closure, i.e., of finding the ensemble of possible backbone structures of a chain segment of a protein molecule that is geometrically consistent with preceding and following parts of the chain whose structures are given. We reduce this problem of determining the loop conformations of six torsions to finding the real roots of a 16th degree polynomial in one variable, based on the robotics literature on the kinematics of the equivalent rotator linkage in the most general case of oblique rotators. We provide a simple intuitive view and derivation of the polynomial for the case in which each of the three pair of torsional axes has a common point. Our method generalizes previous work on analytical loop closure in that the torsion angles need not be consecutive, and any rigid intervening segments are allowed between the free torsions. Our approach also allows for a small degree of flexibility in the bond angles and the peptide torsion angles; this substantially enlarges the space of solvable configurations as is demonstrated by an application of the method to the modeling of cyclic pentapeptides. We give further applications to two important problems. First, we show that this analytical loop closure algorithm can be efficiently combined with an existing loop-construction algorithm to sample loops longer than three residues. Second, we show that Monte Carlo minimization is made severalfold more efficient by employing the local moves generated by the loop closure algorithm, when applied to the global minimization of an eight-residue loop. Our loop closure algorithm is freely available at http://dillgroup. ucsf.edu/loop_closure/. Copyright 2004 Wiley Periodicals, Inc. J Comput Chem 25: 510-528, 2004

  11. 77 FR 70176 - Previous Participation Certification

    Science.gov (United States)

    2012-11-23

    ... participants' previous participation in government programs and ensure that the past record is acceptable prior... information is designed to be 100 percent automated and digital submission of all data and certifications is... government programs and ensure that the past record is acceptable prior to granting approval to participate...

  12. Summer season | Cafeteria closures

    CERN Multimedia

    2013-01-01

    Please note the following cafeteria closures over the summer season: Bldg. 54 closed from 29/07/2013 to 06/09/2013. Bldg. 13: closed from 13/07/2013 to 06/09/2013. Restaurant No. 2, table service (brasserie and restaurant): closed from 01/08/2013 to 06/09/2013. Bldg. 864: closed from 29/07/2013 to 06/09/2013. Bldg. 865: closed from 29/07/2013 to 06/09/2013.

  13. Urethrovaginal fistula closure.

    Science.gov (United States)

    Clifton, Marisa M; Goldman, Howard B

    2017-01-01

    In the developed world, urethrovaginal fistulas are most the likely the result of iatrogenic injury. These fistulas are quite rare. Proper surgical repair requires careful dissection and tension-free closure. The objective of this video is to demonstrate the identification and surgical correction of an urethrovaginal fistula. The case presented is of a 59-year-old woman with a history of pelvic organ prolapse and symptomatic stress urinary incontinence who underwent vaginal hysterectomy, anterior colporrhaphy, posterior colporrhaphy, and synthetic sling placement. Postoperatively, she developed a mesh extrusion and underwent sling excision. After removal of her synthetic sling, she began to experience continuous urinary incontinence. Physical examination and cystourethroscopy demonstrated an urethrovaginal fistula at the midurethra. Options were discussed and the patient wished to undergo transvaginal fistula repair. The urethrovaginal fistula was intubated with a Foley catheter. The fistula tract was isolated and removed. The urethra was then closed with multiple tension-free layers. This video demonstrates several techniques for identifying and subsequently repairing an urethrovaginal fistula. Additionally, it demonstrates the importance of tension-free closure. Urethrovaginal fistulas are rare. They should be repaired with careful dissection and tension-free closure.

  14. Acceptable results of early closure of loop ileostomy to protect low rectal anastomosis

    DEFF Research Database (Denmark)

    Perdawid, Sharafaden Karim; Andersen, Ole Bjørn; Perdawood, Sharaf

    2011-01-01

    INTRODUCTION: This was a pilot project performed prior to full implementation of early loop ileostomy closure (within two weeks) following low anterior resection of the rectum in a group of patients selected according to previously recommended criteria for safe, early ileostomy closure. MATERIAL......, closure operation, the postoperative closure period and follow-up. RESULTS: Eleven patients were included (men, n = 4) with a median age of 58 years (range 47-79 years). Ileostomy closure was performed at a median of ten days (range 8-13 days) following rectum resection. The median hospital stay was 16...

  15. Laparoscopy After Previous Laparotomy

    Directory of Open Access Journals (Sweden)

    Zulfo Godinjak

    2006-11-01

    Full Text Available Following the abdominal surgery, extensive adhesions often occur and they can cause difficulties during laparoscopic operations. However, previous laparotomy is not considered to be a contraindication for laparoscopy. The aim of this study is to present that an insertion of Veres needle in the region of umbilicus is a safe method for creating a pneumoperitoneum for laparoscopic operations after previous laparotomy. In the last three years, we have performed 144 laparoscopic operations in patients that previously underwent one or two laparotomies. Pathology of digestive system, genital organs, Cesarean Section or abdominal war injuries were the most common causes of previouslaparotomy. During those operations or during entering into abdominal cavity we have not experienced any complications, while in 7 patients we performed conversion to laparotomy following the diagnostic laparoscopy. In all patients an insertion of Veres needle and trocar insertion in the umbilical region was performed, namely a technique of closed laparoscopy. Not even in one patient adhesions in the region of umbilicus were found, and no abdominal organs were injured.

  16. Nevada Test Site closure program

    International Nuclear Information System (INIS)

    Shenk, D.P.

    1994-08-01

    This report is a summary of the history, design and development, procurement, fabrication, installation and operation of the closures used as containment devices on underground nuclear tests at the Nevada Test Site. It also addresses the closure program mothball and start-up procedures. The Closure Program Document Index and equipment inventories, included as appendices, serve as location directories for future document reference and equipment use

  17. MNC Subsidiary Closure

    DEFF Research Database (Denmark)

    de Faria, Pedro; Sofka, Wolfgang; Torres Preto, Miguel

    2013-01-01

    We investigate the consequences of MNC subsidiary closures for employees who lose their jobs. We ask to what degree the foreign knowledge that they were exposed to is valued in their new job. We argue theoretically that this foreign knowledge is both valuable and not readily available in the host...... country but is also distant and therefore difficult to absorb. We predict an inverse u-shaped relationship between the exposure to foreign knowledge and the salary in the new job. We empirically support our predictions for a sample of almost 140,000 affected employees in Portugal from 2002 to 2009....

  18. Colostomy closure: how to avoid complications.

    Science.gov (United States)

    Bischoff, Andrea; Levitt, Marc A; Lawal, Taiwo A; Peña, Alberto

    2010-11-01

    Colostomy is an operation frequently performed in pediatric surgery. Despite its benefits, it can produce significant morbidity. In a previous publication we presented our experience with the errors and complications that occurred during cases of colostomy creation. We now have focused in the morbidity related to the colostomy closure. The technical details that might have contributed to the minimal morbidity we experienced are described. The medical records of 649 patients who underwent colostomy closure over a 28-year period were retrospectively reviewed looking for complications following these procedures. Our perioperative protocol for colostomy closure consisted in: clear fluids by mouth and repeated proximal stoma irrigations 24 h prior to the operation. Administration of IV antibiotics during anesthesia induction and continued for 48 h. Meticulous surgical technique that included: packing of the proximal stoma, plastic drape to immobilize the surgical field, careful hemostasis, emphasis in avoiding contamination, cleaning the edge of the stomas to allow a good 2-layer, end-to-end anastomosis with separated long-term absorbable sutures, generous irrigation of the peritoneal cavity and subsequent layers with saline solution, closure by layers to avoid dead space, and avoidance of hematomas. No drains and no nasogastric tubes were used. Oral fluids were started the day after surgery and patients were discharged 48-72 h after the operation. The original diagnoses of the patients were: anorectal malformation (583), Hirschsprung's disease (53), and others (13). 10 patients (1.5%) had complications: 6 had intestinal obstruction (5 due to small bowel adhesions, 1 had temporary delay of the function of the anastomosis due to a severe size discrepancy between proximal and distal stoma with a distal microcolon) and 4 incisional hernias. There were no anastomotic dehiscences or wound infection. There was no bleeding, no anastomotic stricture and no mortality. Based on

  19. Chernobyl: closure by 2000

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Discussions on the future of the Chernobyl nuclear plant between the Ukrainian government, the Group of Seven Industrial nations (GT) and the European Union (EU) are summarized. At the G7 meeting, a timetable for the closure of the entire station by 2000 was presented by Ukrainian officials. The timetable depends on financial commitments from Western governments. Without these, the project would take 10 to 15 years. Following this meeting, which took place on 16-17th May 1995. EU finance ministers authorized release of a ECU 85 million loan. On 23 May, the European Parliament's Committee on Research, Technology and Energy held a public hearing on the Chernobyl station. The primary topic was a feasibility study on the clean-up of Chernobyl 4 and plans for the sarcophagus. Other matters discussed included the effect of the delays and indecision in settling the plants's future. Safety improvements being made to other RBMKs were not being carried out at Chernobyl because of the expected closure. The replacement of the power now supplied to the Ukraine by the Chernobyl reactors is also an issue. The solution favoured by the Ukraine is to being on-line three VVER-1000s that are currently close to completion. Western governments find this solution difficult to accept, however. (UK)

  20. Tight closure and vanishing theorems

    International Nuclear Information System (INIS)

    Smith, K.E.

    2001-01-01

    Tight closure has become a thriving branch of commutative algebra since it was first introduced by Mel Hochster and Craig Huneke in 1986. Over the past few years, it has become increasingly clear that tight closure has deep connections with complex algebraic geometry as well, especially with those areas of algebraic geometry where vanishing theorems play a starring role. The purpose of these lectures is to introduce tight closure and to explain some of these connections with algebraic geometry. Tight closure is basically a technique for harnessing the power of the Frobenius map. The use of the Frobenius map to prove theorems about complex algebraic varieties is a familiar technique in algebraic geometry, so it should perhaps come as no surprise that tight closure is applicable to algebraic geometry. On the other hand, it seems that so far we are only seeing the tip of a large and very beautiful iceberg in terms of tight closure's interpretation and applications to algebraic geometry. Interestingly, although tight closure is a 'characteristic p' tool, many of the problems where tight closure has proved useful have also yielded to analytic (L2) techniques. Despite some striking parallels, there had been no specific result directly linking tight closure and L∼ techniques. Recently, however, the equivalence of an ideal central to the theory of tight closure was shown to be equivalent to a certain 'multiplier ideal' first defined using L2 methods. Presumably, deeper connections will continue to emerge. There are two main types of problems for which tight closure has been helpful: in identifying nice structure and in establishing uniform behavior. The original algebraic applications of tight closure include, for example, a quick proof of the Hochster-Roberts theorem on the Cohen-Macaulayness of rings of invariants, and also a refined version of the Brianqon-Skoda theorem on the uniform behaviour of integral closures of powers of ideals. More recent, geometric

  1. Construction quality assurance closure report, Lawrence Livermore National Laboratory Site 300, Pits 1 and 7

    International Nuclear Information System (INIS)

    1993-02-01

    This document presents the Final Construction Quality Assurance (CQA) report for the closure cover system of two mixed, low-level radioactive and hazardous waste landfills (pits) at Site 300. Site 300, operated by the Lawrence Livermore National Laboratory (LLNL), is located in the Altamont Hills, approximately 15 miles southeast of Livermore, California. The purpose of this report is to document the CQA program established to assure that construction is completed in accordance with the design intent and the approved Closure and Post Closure Plans dated May 1989 and revised January 1990 (EPA ID Number: CA 2890090002). Inclusive within the Closure and Post Closure Plan were the CQA Plan and the Technical Specifications for the final cover system. This report contains a complete narrative with photographic documentation of the construction activities and progress, problems encountered and solutions utilized, and third party testing and monitoring results, thus establishing the verification of compliance with the Quality Assurance Plan for the project

  2. Tubular closure mechanism

    International Nuclear Information System (INIS)

    Kalen, D.D.; Mitchem, J.W.

    1981-01-01

    An apparatus is provided for closing the bore of a tube and releasably securing articles within the tube under longitudinal load. A latching member has a cylindrical section and several circumferentially-spaced elongated latches hanging down from one end of the cylinder. An elongated actuator has integral cam and spline and is partly located within the latch with the cam radially contacting the latches and the spline projecting into the circumferential spaces between the latches. The actuator is axially movable between a position in which the latches are locked to the tube walls and a position in which the latches are secured from contact with the tube walls. Means are provided for axially moving the actuator such that the cam positions the latches; and means are also provided for engaging the articles within the tube. The closure is particularly applicable to tubular irradiation surveillance specimen assembly holders used in reactors

  3. Airport Movement Area Closure Planner, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR research develops an automation tool improving temporary and permanent runway closure management. The Movement Area Closure Planner (MACP) provides airport...

  4. Analysis of the components of a pipeline closure as a unilateral confact problem

    International Nuclear Information System (INIS)

    Barbosa, H.J.C.; Feijoo, R.A.

    1987-03-01

    In many situations in the stress analysis of piping systems and pressure vessels the need to deal with (non-linear) unilateral contact problems arises. A typical case is the analysis of the components of pipe closure. In this work, numerical algorithms developed in previous publications are apllied in an example where the system composed by the closure neck, the blanking plug and the locking ring of a pipe closure is analysed. (Author) [pt

  5. 40 CFR 52.1772 - Approval status.

    Science.gov (United States)

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) North Carolina § 52.1772 Approval status. (a) With the exceptions set forth in this subpart, the Administrator approves North Carolina's plans for... CTGs issued by the previous January. (b) New Source review permits issued pursuant to section 173 of...

  6. 40 CFR 52.2122 - Approval status.

    Science.gov (United States)

    2010-07-01

    ... sources covered by CTGs issued by the previous January. (b) EPA disapproved South Carolina's generic...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) South Carolina § 52.2122 Approval status. (a) With the exceptions set forth in this subpart, the Administrator approves South Carolina's plans for...

  7. Closure report for N Reactor

    International Nuclear Information System (INIS)

    1994-01-01

    This report has been prepared to satisfy Section 3156(b) of Public Law 101-189 (Reports in Connection with Permanent Closures of Department of Energy Defense Nuclear Facilities), which requires submittal of a Closure Report to Congress by the Secretary of Energy upon the permanent cessation of production operations at a US Department of Energy (DOE) defense nuclear facility (Watkins 1991). This closure report provides: (1) A complete survey of the environmental problems at the facility; (2) Budget quality data indicating the cost of environmental restoration and other remediation and cleanup efforts at the facility; (3) A proposed cleanup schedule

  8. Closure report for N Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This report has been prepared to satisfy Section 3156(b) of Public Law 101-189 (Reports in Connection with Permanent Closures of Department of Energy Defense Nuclear Facilities), which requires submittal of a Closure Report to Congress by the Secretary of Energy upon the permanent cessation of production operations at a US Department of Energy (DOE) defense nuclear facility (Watkins 1991). This closure report provides: (1) A complete survey of the environmental problems at the facility; (2) Budget quality data indicating the cost of environmental restoration and other remediation and cleanup efforts at the facility; (3) A proposed cleanup schedule.

  9. Interferometric Imaging Directly with Closure Phases and Closure Amplitudes

    Science.gov (United States)

    Chael, Andrew A.; Johnson, Michael D.; Bouman, Katherine L.; Blackburn, Lindy L.; Akiyama, Kazunori; Narayan, Ramesh

    2018-04-01

    Interferometric imaging now achieves angular resolutions as fine as ∼10 μas, probing scales that are inaccessible to single telescopes. Traditional synthesis imaging methods require calibrated visibilities; however, interferometric calibration is challenging, especially at high frequencies. Nevertheless, most studies present only a single image of their data after a process of “self-calibration,” an iterative procedure where the initial image and calibration assumptions can significantly influence the final image. We present a method for efficient interferometric imaging directly using only closure amplitudes and closure phases, which are immune to station-based calibration errors. Closure-only imaging provides results that are as noncommittal as possible and allows for reconstructing an image independently from separate amplitude and phase self-calibration. While closure-only imaging eliminates some image information (e.g., the total image flux density and the image centroid), this information can be recovered through a small number of additional constraints. We demonstrate that closure-only imaging can produce high-fidelity results, even for sparse arrays such as the Event Horizon Telescope, and that the resulting images are independent of the level of systematic amplitude error. We apply closure imaging to VLBA and ALMA data and show that it is capable of matching or exceeding the performance of traditional self-calibration and CLEAN for these data sets.

  10. Multicentre study on capsular closure versus non-capsular closure during hip arthroscopy in Danish patients with femoroacetabular impingement (FAI)

    DEFF Research Database (Denmark)

    Dippmann, Christian; Kraemer, Otto; Lund, Bent

    2018-01-01

    in patients without additional risk factors for instability such as hypermobility or dysplasia of the hip. We hypothesised that capsular closure will lead to a superior outcome in hip arthroscopy for femoroacetabular impingement syndrome (FAIS) compared with non-capsular closure. METHODS AND ANALYSIS...... years and FAIS according to the Warwick agreement. Exclusion criteria are: previous hip surgery in either hip, previous conditions of Legg-Calvé-Perthes or slipped capital femoral epiphysis, malignant disease, recent hip or pelvic fractures, arthritis, Ehlers-Danlos or Marfan disease, recent (within 6...

  11. Borehole closure in salt

    International Nuclear Information System (INIS)

    Fuenkajorn, K.; Daemen, J.J.K.

    1988-12-01

    Constitutive law parameters are determined from salt behavior characterization experiments. The results are applied to predict creep (time-dependent) closure of boreholes in salt specimens subjected to various loading configurations. Rheological models (linear and nonlinear viscoelastic and viscoplastic models), empirical models, and physical theory models have been formulated from the results of uniaxial creep tests, strain and stress rate controlled uniaxial tests, constant strain rate triaxial tests, cyclic loading tests, and seismic velocity measurements. Analytical solutions for a thick-walled cylinder subjected to internal and external pressures and for a circular hole in an infinite plate subjected to a biaxial or uniaxial stressfield have been derived from each of the linear viscoelastic models and from one of the empirical laws. The experimental results indicate that the salt samples behave as an elastic-viscoplastic material. The elastic behavior tends to be linear and time-independent. The plastic deformation is time-dependent. The stress increment to strain rate increment ratio gradually decreases as the stress level increases. The transient potential creep law seems to give the simplest satisfactory governing equation describing the viscoplastic behavior of salt during the transient phase. 204 refs., 27 figs., 29 tabs

  12. Closure and Sealing Design Calculation

    International Nuclear Information System (INIS)

    T. Lahnalampi; J. Case

    2005-01-01

    The purpose of the ''Closure and Sealing Design Calculation'' is to illustrate closure and sealing methods for sealing shafts, ramps, and identify boreholes that require sealing in order to limit the potential of water infiltration. In addition, this calculation will provide a description of the magma that can reduce the consequences of an igneous event intersecting the repository. This calculation will also include a listing of the project requirements related to closure and sealing. The scope of this calculation is to: summarize applicable project requirements and codes relating to backfilling nonemplacement openings, removal of uncommitted materials from the subsurface, installation of drip shields, and erecting monuments; compile an inventory of boreholes that are found in the area of the subsurface repository; describe the magma bulkhead feature and location; and include figures for the proposed shaft and ramp seals. The objective of this calculation is to: categorize the boreholes for sealing by depth and proximity to the subsurface repository; develop drawing figures which show the location and geometry for the magma bulkhead; include the shaft seal figures and a proposed construction sequence; and include the ramp seal figure and a proposed construction sequence. The intent of this closure and sealing calculation is to support the License Application by providing a description of the closure and sealing methods for the Safety Analysis Report. The closure and sealing calculation will also provide input for Post Closure Activities by describing the location of the magma bulkhead. This calculation is limited to describing the final configuration of the sealing and backfill systems for the underground area. The methods and procedures used to place the backfill and remove uncommitted materials (such as concrete) from the repository and detailed design of the magma bulkhead will be the subject of separate analyses or calculations. Post-closure monitoring will not

  13. Amnioserosa cell constriction but not epidermal actin cable tension autonomously drives dorsal closure.

    Science.gov (United States)

    Pasakarnis, Laurynas; Frei, Erich; Caussinus, Emmanuel; Affolter, Markus; Brunner, Damian

    2016-11-01

    Tissue morphogenesis requires coordination of multiple force-producing components. During dorsal closure in fly embryogenesis, an epidermis opening closes. A tensioned epidermal actin/MyosinII cable, which surrounds the opening, produces a force that is thought to combine with another MyosinII force mediating apical constriction of the amnioserosa cells that fill the opening. A model proposing that each force could autonomously drive dorsal closure was recently challenged by a model in which the two forces combine in a ratchet mechanism. Acute force elimination via selective MyosinII depletion in one or the other tissue shows that the amnioserosa tissue autonomously drives dorsal closure while the actin/MyosinII cable cannot. These findings exclude both previous models, although a contribution of the ratchet mechanism at dorsal closure onset remains likely. This shifts the current view of dorsal closure being a combinatorial force-component system to a single tissue-driven closure event.

  14. Colostomy closure: how to avoid complications

    Science.gov (United States)

    Levitt, Marc A.; Lawal, Taiwo A.; Peña, Alberto

    2010-01-01

    Purpose Colostomy is an operation frequently performed in pediatric surgery. Despite its benefits, it can produce significant morbidity. In a previous publication we presented our experience with the errors and complications that occurred during cases of colostomy creation. We now have focused in the morbidity related to the colostomy closure. The technical details that might have contributed to the minimal morbidity we experienced are described. Methods The medical records of 649 patients who underwent colostomy closure over a 28-year period were retrospectively reviewed looking for complications following these procedures. Our perioperative protocol for colostomy closure consisted in: clear fluids by mouth and repeated proximal stoma irrigations 24 h prior to the operation. Administration of IV antibiotics during anesthesia induction and continued for 48 h. Meticulous surgical technique that included: packing of the proximal stoma, plastic drape to immobilize the surgical field, careful hemostasis, emphasis in avoiding contamination, cleaning the edge of the stomas to allow a good 2-layer, end-to-end anastomosis with separated long-term absorbable sutures, generous irrigation of the peritoneal cavity and subsequent layers with saline solution, closure by layers to avoid dead space, and avoidance of hematomas. No drains and no nasogastric tubes were used. Oral fluids were started the day after surgery and patients were discharged 48–72 h after the operation. Results The original diagnoses of the patients were: anorectal malformation (583), Hirschsprung’s disease (53), and others (13). 10 patients (1.5%) had complications: 6 had intestinal obstruction (5 due to small bowel adhesions, 1 had temporary delay of the function of the anastomosis due to a severe size discrepancy between proximal and distal stoma with a distal microcolon) and 4 incisional hernias. There were no anastomotic dehiscences or wound infection. There was no bleeding, no anastomotic

  15. Closure plan for the M-Area settling basin and vicinity at the Savannah River Plant

    International Nuclear Information System (INIS)

    Colven, W.P.; Pickett, J.B.; Muska, C.F.; Boone, L.F.

    1988-03-01

    The closure plan for the M-Area settling basin and vicinity was originally submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) Bureau of Solid and Hazardous Waste Management in September 1984. The plan was revised in July and November 1985 in response to SCDHEC comments. After public comment in April through July 1986, the closure plan was conditionally approved by SCDHEC in March 1987. The conditions included (1) providing a temporary wastewater treatment facility to process the water remaining in the basin, (2) using a burn box to limit ash emissions from burning in the basin, (3) obtaining SCDHEC approval prior to operating the leach field, and (4) completing all closure activities within three years of the startup date

  16. Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): (sm b ullet) CAS 03-59-01, Bldg 3C-36 Septic System (sm b ullet) CAS 03-59-02, Bldg 3C-45 Septic System (sm b ullet) CAS 06-51-01, Sump and Piping (sm b ullet) CAS 06-51-02, Clay Pipe and Debris (sm b ullet) CAS 06-51-03, Clean Out Box and Piping (sm b ullet) CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work

  17. Association of iris crypts with acute primary angle closure.

    Science.gov (United States)

    Koh, Victor; Chua, Jacqueline; Shi, Yuan; Thakku, Sri Gowtham; Lee, Ryan; Nongpiur, Monisha E; Baskaran, Mani; Kumar, Rajesh S; Perera, Shamira; Aung, Tin; Cheng, Ching-Yu

    2017-10-01

    To determine the relationship between iris surface features and acute primary angle closure (APAC) in eyes with angle closure. Case-control study involving Asian patients diagnosed with previous APAC, primary angle closure suspect (PACS), primary angle closure (PAC) and primary angle closure glaucoma (PACG) at an eye centre in Singapore between August 2012 and January 2015. Participants underwent ophthalmic examination and digital slit-lamp iris photography. Iris surface features were graded based on crypts, furrows and colour. Fellow eyes of APAC were compared with PACS and PAC/PACG eyes with regard to their iris surface features. Occurrence of APAC. A total of 309 patients (71 APAC, 139 PACS, 47 PAC and 52 PACG) were included (mean age: 67.7±7.2 years and 36.6% male). Compared with PACS, higher crypt grade was significantly associated with lower odds of APAC (OR=0.58 for one grade higher in crypt grade; p=0.027, adjusted for age, gender, ethnicity and pupil diameter). The results remained similar when compared with PAC/PACG group (OR=0.58 for one grade higher in crypt grade; p=0.043). We did not observe any significant associations between iris furrows or colour with presence of APAC. Our study comprising Asian eyes with angle closure suggests that the presence of a higher crypt grading may be protective for APAC. As such, assessing iris surface architecture for crypts could be a new measure for risk stratification of developing APAC in eyes with angle closure. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  18. Neratinib: First Global Approval.

    Science.gov (United States)

    Deeks, Emma D

    2017-10-01

    Neratinib (Nerlynx™) is an oral, irreversible inhibitor of the human epidermal growth factor receptors HER1 (EGFR), HER2 and HER4. The drug originally arose from research by Wyeth (now Pfizer) and is now being developed by Puma Biotechnology primarily for the treatment of HER2-positive (HER+) breast cancer. Neratinib is approved in the USA for the extended adjuvant treatment of patients with HER2+ early-stage breast cancer who have been previously treated with a trastuzumab-based adjuvant regimen, and is in the preregistration phase for this indication in the EU. Neratinib, as monotherapy and/or combination therapy, is also in phase 3 development for metastatic breast cancer and in phase 1/2 development for advanced breast cancer and other solid tumours, including non-small cell lung cancer, colorectal cancer and glioblastoma. This article summarizes the milestones in the development of neratinib leading to this first approval for breast cancer.

  19. Fuel channel closure and adapter

    International Nuclear Information System (INIS)

    Cashen, W.S.

    1985-01-01

    This invention provides a mechanical closure/actuating ram combination particularly suited for use in sealing the ends of the pressure tubes when a CANDU-type reactor is refueled. It provides a cluster that may be inserted into a fuel channel end fitting to provide at least partial closing off of a pressure tube while permitting the disengagement of the fueling machine and its withdrawal from the closure for other purposes. The invention also provides a ram/closure combination wherein the application of loading force to a deformable sealing disk is regulated by a massive load bar component forming part of the fueling machine and being therefore accessible for maintenance or replacement

  20. An Elongated Leading Edge Facilitates Rotation Flap Closure: In Vivo Demonstration.

    Science.gov (United States)

    Lichon, Vanessa; Barbosa, Naiara; Gomez, Doug; Goldman, Glenn

    2016-01-01

    Variation in the design of a rotation flap may affect wound closure tension. Lengthening the leading edge of a rotation flap has been a method of reducing the tension of closure in the primary motion. An in vitro study negating this tenant has been published. The authors set out to design an in vivo experiment to determine if lengthening the leading edge of a rotation flap has the effect of reducing closure tension in the primary motion of the repair. An animal study approved by Institutional Animal Care and Use Committee was undertaken in a pig model. A tension-measuring apparatus was designed using Teflon-coated wires and digital tensiometers. Rotation flaps of a standard design and with elongated leading edges were incised on the flanks of pigs under general anesthesia. Flap closure tensions were measured at points along the leading edge of the flap and in the secondary motion. Elongating the leading edge of a flap led to a statistically significant reduction in closure tension in the primary motion of the flap and at the flap tip. The secondary motion closure tensions were essentially unaffected. The authors confirm that elongating the leading edge of a standard rotation flap will reduce closure tension in the primary flap motion.

  1. Stationary neutrino radiation transport by maximum entropy closure

    International Nuclear Information System (INIS)

    Bludman, S.A.

    1994-11-01

    The authors obtain the angular distributions that maximize the entropy functional for Maxwell-Boltzmann (classical), Bose-Einstein, and Fermi-Dirac radiation. In the low and high occupancy limits, the maximum entropy closure is bounded by previously known variable Eddington factors that depend only on the flux. For intermediate occupancy, the maximum entropy closure depends on both the occupation density and the flux. The Fermi-Dirac maximum entropy variable Eddington factor shows a scale invariance, which leads to a simple, exact analytic closure for fermions. This two-dimensional variable Eddington factor gives results that agree well with exact (Monte Carlo) neutrino transport calculations out of a collapse residue during early phases of hydrostatic neutron star formation

  2. 40 CFR 265.280 - Closure and post-closure.

    Science.gov (United States)

    2010-07-01

    ... contaminants caused by wind erosion; and (4) Compliance with § 265.276 concerning the growth of food-chain... and post-closure care objectives of paragraph (a) of this section: (1) Type and amount of hazardous..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and...

  3. Closure certification report for the Bear Creek burial grounds B area and walk-in pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-06-01

    On July 5, 1993, the revised RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, DOE/OR/01-1100 ampersand D3 and Y/ER-53 ampersand D3, was approved by the Tennessee Department of Environment and Conservation (TDEC). The closure activities described in that closure plan have been performed. The purpose of this document is to summarize the closure activities for B Area and Walk-In Pits (WIPs), including placement of the Kerr Hollow Quarry debris at the WIPs

  4. 50 CFR 648.161 - Closures.

    Science.gov (United States)

    2010-10-01

    ... Bluefish Fishery § 648.161 Closures. (a) EEZ closure. NMFS shall close the EEZ to fishing for bluefish by... dealer permit holders that no commercial quota is available for landing bluefish in that state. ...

  5. Moment Closure for the Stochastic Logistic Model

    National Research Council Canada - National Science Library

    Singh, Abhyudai; Hespanha, Joao P

    2006-01-01

    ..., which we refer to as the moment closure function. In this paper, a systematic procedure for constructing moment closure functions of arbitrary order is presented for the stochastic logistic model...

  6. CIRSE Vascular Closure Device Registry

    International Nuclear Information System (INIS)

    Reekers, Jim A.; Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2011-01-01

    Purpose: Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods: The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results: Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0–14.5] for antegrade access and 1.8% (95% CI 1.1–2.9) for retrograde access (P = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only 5.9 cm, and two vessel occlusions. Conclusion: The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters.

  7. 304 Concretion facility closure plan

    International Nuclear Information System (INIS)

    1990-04-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium Zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/Zircaloy-2 alloy, and Zircaloy-2 chips and fines were secured in concrete billets in the 304 Concretion Facility, located in the 300 Area. The beryllium/Zircaloy-2 alloy and Zircaloy-2 chips and fines are designated as low-level radioactive mixed waste (LLRMW) with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Concretion Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act of 1976 (RCRA). This closure plan presents a description of the facility, the history of materials and wastes managed, and the procedures that will be followed to close the 304 Concretion Facility (304 Facility). Clean closure of the 304 Facility is the proposed method for closure of the facility. Justification for this proposal is presented. 15 refs., 22 figs., 4 tabs

  8. Telephone switchboard closure | 19 December

    CERN Multimedia

    2014-01-01

    Exceptionally, the telephone switchboard will close at 4 p.m. on Friday, 19 December, instead of the usual time of 6 p.m., to allow time for closing all systems properly before the annual closure. Therefore, switchboard operator assistance to transfer calls from/to external lines will stop. All other phone services will run as usual.

  9. CIRSE Vascular Closure Device Registry

    Science.gov (United States)

    Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2010-01-01

    Purpose Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0–14.5] for antegrade access and 1.8% (95% CI 1.1–2.9) for retrograde access (P = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only 5.9 cm, and two vessel occlusions. Conclusion The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters. PMID:20981425

  10. ACB Service Final Closure

    CERN Multimedia

    IT Department

    2004-01-01

    As previously announced in CERN weekly Bulletin 18/2004 of 26 April 2004, and following a discussion at the Desktop Forum on 28 October, the Automatic Call Back (ACB) service will be definitely closed on Friday 10 December 2004. If the ACB phone number is dialed after that date over plain telephone or ISDN, the call will remain unanswered. Therefore, the remaining ACB users are encouraged to switch as soon as possible to ISPs (Internet Service Providers) which provide equivalent or better service. Some suggestions on how to make alternative arrangements have been made available on the Remote Access web site. IT Department

  11. ACB Service Final Closure

    CERN Multimedia

    IT Department

    2004-01-01

    As previously announced in CERN weekly Bulletin 18/2004 of 26th April 2004, and following a discussion at the Desktop Forum on 28th October, the Automatic Call Back (ACB) service will be definitely closed on Friday 10th December 2004. If the ACB phone number is dialed after that date over plain telephone or ISDN, the call will remain unanswered. Therefore, the remaining ACB users are encouraged to switch as soon as possible to ISPs (Internet Service Providers) which provide equivalent or better service. Some suggestions on how to make alternative arrangements have been made available on the Remote Access web site: http://www.cern.ch/ras IT Department

  12. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 115: AREA 25 TEST CELL A FACILITY, NEVADA TEST SITE, NEVADA

    International Nuclear Information System (INIS)

    2006-01-01

    This Closure Report (CR) describes the activities performed to close CAU 115, Area 25 Test Cell A Facility, as presented in the NDEP-approved SAFER Plan (NNSA/NSO, 2004). The SAFER Plan includes a summary of the site history, process knowledge, and closure standards. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical and radiological data to confirm that the remediation goals were met and to document final site conditions. The approved closure alternative as presented in the SAFER Plan for CAU 115 (NNSA/NSO, 2004) was clean closure; however, closure in place was implemented under a Record of Technical Change (ROTC) to the SAFER Plan when radiological surveys indicated that the concrete reactor pad was radiologically activated and could not be decontaminated to meet free release levels. The ROTC is included as Appendix G of this report. The objectives of closure were to remove any trapped residual liquids and gases, dispose regulated and hazardous waste, decontaminate removable radiological contamination, demolish and dispose aboveground structures, remove the dewar as a best management practice (BMP), and characterize and restrict access to all remaining radiological contamination. Radiological contaminants of concern (COCs) included cobalt-60, cesium-137, strontium-90, uranium-234/235/236/238, and plutonium-239/240. Additional COCs included Resource Conservation and Recovery Act (RCRA) metals, polychlorinated biphenyls (PCBs), and asbestos

  13. Accelerating cleanup. Paths to closure Hanford Site

    International Nuclear Information System (INIS)

    Edwards, C.

    1998-01-01

    This document was previously referred to as the Draft 2006 Plan. As part of the DOE's national strategy, the Richland Operations Office's Paths to Closure summarizes an integrated path forward for environmental cleanup at the Hanford Site. The Hanford Site underwent a concerted effort between 1994 and 1996 to accelerate the cleanup of the Site. These efforts are reflected in the current Site Baseline. This document describes the current Site Baseline and suggests strategies for further improvements in scope, schedule and cost. The Environmental Management program decided to change the name of the draft strategy and the document describing it in response to a series of stakeholder concerns, including the practicality of achieving widespread cleanup by 2006. Also, EM was concerned that calling the document a plan could be misconstrued to be a proposal by DOE or a decision-making document. The change in name, however, does not diminish the 2006 vision. To that end, Paths to Closure retains a focus on 2006, which serves as a point in time around which objectives and goals are established

  14. 75 FR 29322 - Base Closure and Realignment

    Science.gov (United States)

    2010-05-25

    ... DEPARTMENT OF DEFENSE Office of the Secretary Base Closure and Realignment AGENCY: Office of...)(ii) of the Defense Base Closure and Realignment Act of 1990. It provides a partial list of military installations closing or realigning pursuant to the 2005 Base Closure and Realignment (BRAC) Report. It also...

  15. Clone of EPA Approved Regulations in the Texas SIP

    Science.gov (United States)

    changed name to EPA Approved Regulations in the Texas SIP, Add links to:Texas Read Me; Texas SIP History;Current/Previous SIP-Approved Regulations; Delete regulations--now in /node/191099, removed tables

  16. Influence of Closure & Non-Closure of the Visceral and Parietal Peritoneum on Post Cesarean Morbidity

    Directory of Open Access Journals (Sweden)

    Tabasi Z.

    2010-01-01

    Full Text Available AbstractBackground and Objectives: One of the most important issues in promoting mother and child health is reducing the morbidity rate after cesarean section. The aim of this study was to investigate the influence of closure and non-closure of the visceral and parietal peritoneum on post cesarean morbidity in women attending Shabihkhani Maternity Hospital in Kashan, Iran.Methods: This study was conducted with a single blind randomized clinical trial method on 100 parturient women that underwent emergency or elective cesarean section. Patients with previous cesarean section and or abdominal surgery, diseases such as hypertension, diabetes mellitus and premature rupture of membrane and pre operative bleeding, were excluded from this study. Then, the participants were randomly divided into two groups: in one group both peritoneal layers were closed while in the other group, they were not closed. Post operative morbidity including fever, bleeding, post operative pain, analgesic consumption and time of operation were assessed. Data were analyzed with t-tests, and χ2 and a P<0.05 were considered significant.Results: In this study, there were no significant differences between the two groups with respect to age, gestational age, the reason for caesarean section and gravidity, nor were there any differences with respect to the incidence of fever or bleeding and was similar between the two groups, but there was a significant difference between the two groups regarding to feeling of severe pain (P=0.0003, analgesic consumption (P=0.0003 and time of operation (P=0.004. In the non-closure group, dose of analgesic drugs, pain severity and time of operation were less than those of the other group.Conclusion: The Findings showed that non-closure of peritoneal layers as a shorter and simpler procedure has no influence on increasing post cesarean morbidity. Therefore, due to maternal health promotion and early neonatal breastfeeding, non closure of peritoneal

  17. Influence of Closure & Non-Closure of the Visceral and Parietal Peritoneum on Post Cesarean Morbidity

    Directory of Open Access Journals (Sweden)

    Z Tabasi

    2012-05-01

    Full Text Available

    Background and Objectives: One of the most important issues in promoting mother and child health is reducing the morbidity rate after cesarean section. The aim of this study was to investigate the influence of closure and non-closure of the visceral and parietal peritoneum on post cesarean morbidity in women attending Shabihkhani Maternity Hospital in Kashan, Iran.

    Methods: This study was conducted with a single blind randomized clinical trial method on 100 parturient women that underwent emergency or elective cesarean section. Patients with previous cesarean section and or abdominal surgery, diseases such as hypertension, diabetes mellitus and premature rupture of membrane and pre operative bleeding, were excluded from this study. Then, the participants were randomly divided into two groups: in one group both peritoneal layers were closed while in the other group, they were not closed. Post operative morbidity including fever, bleeding, post operative pain, analgesic consumption and time of operation were assessed. Data were analyzed with t-tests, and χ2 and a P<0.05 were considered significant.

    Results: In this study, there were no significant differences between the two groups with respect to age, gestational age, the reason for caesarean section and gravidity, nor were there any differences with respect to the incidence of fever or bleeding and was similar between the two groups, but there was a significant difference between the two groups regarding to feeling of severe pain (P=0.0003, analgesic consumption (P=0.0003 and time of operation (P=0.004. In the non-closure group, dose of analgesic drugs, pain severity and time of operation were less than those of the other group.

    Conclusion: The
  18. Economic Evaluation of Individual School Closure Strategies: The Hong Kong 2009 H1N1 Pandemic.

    Directory of Open Access Journals (Sweden)

    Zoie Shui-Yee Wong

    Full Text Available School closures as a means of containing the spread of disease have received considerable attention from the public health community. Although they have been implemented during previous pandemics, the epidemiological and economic effects of the closure of individual schools remain unclear.This study used data from the 2009 H1N1 pandemic in Hong Kong to develop a simulation model of an influenza pandemic with a localised population structure to provide scientific justifications for and economic evaluations of individual-level school closure strategies.The estimated cost of the study's baseline scenario was USD330 million. We found that the individual school closure strategies that involved all types of schools and those that used a lower threshold to trigger school closures had the best performance. The best scenario resulted in an 80% decrease in the number of cases (i.e., prevention of about 830,000 cases, and the cost per case prevented by this intervention was USD1,145; thus, the total cost was USD1.28 billion.This study predicts the effects of individual school closure strategies on the 2009 H1N1 pandemic in Hong Kong. Further research could determine optimal strategies that combine various system-wide and district-wide school closures with individual school triggers across types of schools. The effects of different closure triggers at different phases of a pandemic should also be examined.

  19. Revisiting the Landau fluid closure.

    Science.gov (United States)

    Hunana, P.; Zank, G. P.; Webb, G. M.; Adhikari, L.

    2017-12-01

    Advanced fluid models that are much closer to the full kinetic description than the usual magnetohydrodynamic description are a very useful tool for studying astrophysical plasmas and for interpreting solar wind observational data. The development of advanced fluid models that contain certain kinetic effects is complicated and has attracted much attention over the past years. Here we focus on fluid models that incorporate the simplest possible forms of Landau damping, derived from linear kinetic theory expanded about a leading-order (gyrotropic) bi-Maxwellian distribution function f_0, under the approximation that the perturbed distribution function f_1 is gyrotropic as well. Specifically, we focus on various Pade approximants to the usual plasma response function (and to the plasma dispersion function) and examine possibilities that lead to a closure of the linear kinetic hierarchy of fluid moments. We present re-examination of the simplest Landau fluid closures.

  20. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Lippitt, J.M.; Kolthoff, K.

    1995-01-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP's commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out

  1. Delayed primary closure of bladder exstrophy: immediate postoperative management leading to successful outcomes.

    Science.gov (United States)

    Baradaran, Nima; Stec, Andrew A; Schaeffer, Anthony J; Gearhart, John P; Mathews, Ranjiv I

    2012-02-01

    To present the critical features of our postoperative plan for children undergoing delayed primary bladder closure because appropriate postoperative management is crucial to successful exstrophy repair. Using an institutionally approved database, patients with bladder exstrophy whose primary bladder closure was performed at least 1 month after birth were identified. All aspects of the postoperative management were reviewed. A total of 20 patients (18 boys) were identified: 19 with classic bladder extrosphy and 1 with an exstrophy variant. The patients underwent closure at a mean age of 9.9 months. All patients underwent pelvic osteotomy and immobilization for an average of 34.8 days. Analgesia was administered by way of a tunneled epidural catheter in 90% of patients for an average of 18.8 days, and 12 patients (60%) required adjunct intravenous analgesia. Bilateral ureteral catheters and suprapubic tubes were used in all patients. Total parenteral nutrition was administered to 10 (83%) of 12 patients who underwent closure after 2000. All patients received preoperative antibiotics and 2 weeks of postoperative intravenous antibiotics that was followed by oral prophylaxis. The mean hospital stay was 6.3 weeks. With an average follow-up of 7.4 years, delayed closure was 100% successful. Successful delayed primary closure of bladder exstrophy requires a multidisciplinary approach. The keys to success include osteotomy, pelvic immobilization, analgesia, nutritional support, maximal bladder drainage, and infection prophylaxis. Copyright © 2012. Published by Elsevier Inc.

  2. Observations on early and delayed colostomy closure.

    Science.gov (United States)

    Tade, A O; Salami, B A; Ayoade, B A

    2011-06-01

    Traditional treatment of a variety of colorectal pathologies had included a diverting colostomy that was closed eight or more weeks later during a readmission. The aim of this retrospective study was to determine the outcomes of early colostomy closure and delayed colostomy closure in patients with temporary colostomies following traumatic and non-traumatic colorectal pathologies. In this study early colostomy closure was the closure of a colostomy within three weeks of its construction, while delayed colostomy closure referred to closure after 3 weeks. Complete records of the 37 adult patients who had temporary colostomy constructed and closed between Jan. 1997 December 2003 for various colorectal pathologies were studied. Fourteen patients had early colostomy closure while 23 had delayed closure. In the early colostomy closure group there were 10 men and 4 women. The mean age of the patients was 28yr with a range of 18-65yr. Colostomies were closed 9-18 days after initial colostomy construction. There was no mortality. Morbidity rate 28.6% (4 out of 14). There were two faecal fistulas (14.3%). Twenty-three patients had delayed colostomy closure 8 weeks to 18 months after initial colostomy construction. These were patients unfit for early surgery after initial colostomy construction because of carcinoma, significant weight loss, or sepsis. There was no mortality. Morbidity rate was 26.1%. There were 3 faecal fistulas (13.2%). Outcomes following early colostomy closure and delayed closure were comparable. Patients fit for surgery should have early closure whilst patients who may have compromised health should have delayed closure.

  3. 304 Concretion Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with Zircaloy-2 and copper silicon allo , uranium-titanium alloy, beryllium/Zircaloy-2 alloy, and Zircaloy-2 chips and fines were secured in concrete billets (7.5-gal containers) in the 304 Concretion Facility (304 Facility), located in the 300 Area. The beryllium/Zircaloy-2 alloy and Zircaloy-2 chips and fines are designated as low-level radioactive mixed waste (LLRMW) with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Concretion Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act of 1976 (RCRA) and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040 (Ecology 1991). This closure plan presents a description of the facility, the history of materials and wastes managed, and the procedures that will be followed to close the 304 Facility. The strategy for closure of the 304 Facility is presented in Section 6.0

  4. Repository Closure and Sealing Approach

    International Nuclear Information System (INIS)

    A.T. Watkins

    2000-01-01

    The scope of this analysis will be to develop the conceptual design of the closure seals and their locations in the Subsurface Facilities. The design will be based on the recently established program requirements for transitioning to the Site Recommendation (SR) design as outlined by ''Approach to Implementing the Site Recommendation Baseline'' (Stroupe 2000) and the ''Monitored Geologic Repository Project Description Document'' (CRWMS M andO 1999b). The objective of this analysis will be to assist in providing a description for the Subsurface Facilities System Description Document, Section 2 and finally to document any conclusions reached in order to contribute and provide support to the SR. This analysis is at a conceptual level and is considered adequate to support the SR design. The final closure barriers and seals for the ventilation shafts, and the north and south ramps will require these openings to be permanently sealed to limit excessive air and water inflows and prevent human intrusion. The major tasks identified with closure in this analysis are: (1) Developing the overall subsurface seal layout and identifying design and operational interfaces for the Subsurface Facilities. (2) Summarizing the general site conditions and general rock characteristic with respect to seal location and describing the seal selected. (3) Identify seal construction materials, methodology of construction and strategic locations including design of the seal and plugs. (4) Discussing methods to prevent human intrusion

  5. Post-Closure Inspection Report for Corrective Action Unit 427: Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit[CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427. Area 3 Septic Waste Systems 2 and 6. Tonopah Test Range, Nevada, report number DOE/NV-561. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. The annual post-closure inspection at CAU 427 consists of the following: Verification of the presence of all leachfield and septic tank below-grade markers; Verification that the warning signs are in-place, intact, and readable; and Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on June 20, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C

  6. Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit[CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV-284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C

  7. Superresolving Black Hole Images with Full-Closure Sparse Modeling

    Science.gov (United States)

    Crowley, Chelsea; Akiyama, Kazunori; Fish, Vincent

    2018-01-01

    It is believed that almost all galaxies have black holes at their centers. Imaging a black hole is a primary objective to answer scientific questions relating to relativistic accretion and jet formation. The Event Horizon Telescope (EHT) is set to capture images of two nearby black holes, Sagittarius A* at the center of the Milky Way galaxy roughly 26,000 light years away and the other M87 which is in Virgo A, a large elliptical galaxy that is 50 million light years away. Sparse imaging techniques have shown great promise for reconstructing high-fidelity superresolved images of black holes from simulated data. Previous work has included the effects of atmospheric phase errors and thermal noise, but not systematic amplitude errors that arise due to miscalibration. We explore a full-closure imaging technique with sparse modeling that uses closure amplitudes and closure phases to improve the imaging process. This new technique can successfully handle data with systematic amplitude errors. Applying our technique to synthetic EHT data of M87, we find that full-closure sparse modeling can reconstruct images better than traditional methods and recover key structural information on the source, such as the shape and size of the predicted photon ring. These results suggest that our new approach will provide superior imaging performance for data from the EHT and other interferometric arrays.

  8. Multivariate moment closure techniques for stochastic kinetic models

    International Nuclear Information System (INIS)

    Lakatos, Eszter; Ale, Angelique; Kirk, Paul D. W.; Stumpf, Michael P. H.

    2015-01-01

    Stochastic effects dominate many chemical and biochemical processes. Their analysis, however, can be computationally prohibitively expensive and a range of approximation schemes have been proposed to lighten the computational burden. These, notably the increasingly popular linear noise approximation and the more general moment expansion methods, perform well for many dynamical regimes, especially linear systems. At higher levels of nonlinearity, it comes to an interplay between the nonlinearities and the stochastic dynamics, which is much harder to capture correctly by such approximations to the true stochastic processes. Moment-closure approaches promise to address this problem by capturing higher-order terms of the temporally evolving probability distribution. Here, we develop a set of multivariate moment-closures that allows us to describe the stochastic dynamics of nonlinear systems. Multivariate closure captures the way that correlations between different molecular species, induced by the reaction dynamics, interact with stochastic effects. We use multivariate Gaussian, gamma, and lognormal closure and illustrate their use in the context of two models that have proved challenging to the previous attempts at approximating stochastic dynamics: oscillations in p53 and Hes1. In addition, we consider a larger system, Erk-mediated mitogen-activated protein kinases signalling, where conventional stochastic simulation approaches incur unacceptably high computational costs

  9. Multivariate moment closure techniques for stochastic kinetic models

    Energy Technology Data Exchange (ETDEWEB)

    Lakatos, Eszter, E-mail: e.lakatos13@imperial.ac.uk; Ale, Angelique; Kirk, Paul D. W.; Stumpf, Michael P. H., E-mail: m.stumpf@imperial.ac.uk [Department of Life Sciences, Centre for Integrative Systems Biology and Bioinformatics, Imperial College London, London SW7 2AZ (United Kingdom)

    2015-09-07

    Stochastic effects dominate many chemical and biochemical processes. Their analysis, however, can be computationally prohibitively expensive and a range of approximation schemes have been proposed to lighten the computational burden. These, notably the increasingly popular linear noise approximation and the more general moment expansion methods, perform well for many dynamical regimes, especially linear systems. At higher levels of nonlinearity, it comes to an interplay between the nonlinearities and the stochastic dynamics, which is much harder to capture correctly by such approximations to the true stochastic processes. Moment-closure approaches promise to address this problem by capturing higher-order terms of the temporally evolving probability distribution. Here, we develop a set of multivariate moment-closures that allows us to describe the stochastic dynamics of nonlinear systems. Multivariate closure captures the way that correlations between different molecular species, induced by the reaction dynamics, interact with stochastic effects. We use multivariate Gaussian, gamma, and lognormal closure and illustrate their use in the context of two models that have proved challenging to the previous attempts at approximating stochastic dynamics: oscillations in p53 and Hes1. In addition, we consider a larger system, Erk-mediated mitogen-activated protein kinases signalling, where conventional stochastic simulation approaches incur unacceptably high computational costs.

  10. Storage shaft definitive closure plug and method

    International Nuclear Information System (INIS)

    Dardaine, M.

    1992-01-01

    A definitive closure plug system for radioactive waste storage at any deepness, is presented. The inherent weight of the closure materials is used to set in the plug: these materials display an inclined sliding surface in such a way that when the closure material rests on a stable surface of the shaft storage materials, the relative sliding of the different materials tends to spread them towards the shaft internal wall so as to completely occlude the shaft

  11. 100-D Ponds closure plan. Revision 1

    International Nuclear Information System (INIS)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit is clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure

  12. Closure Welding of Plutonium Bearing Storage Containers

    International Nuclear Information System (INIS)

    Cannell, G.R.

    2002-01-01

    A key element in the Department of Energy (DOE) strategy for the stabilization, packaging and storage of plutonium-bearing materials involves closure welding of DOE-STD-3013 Outer Containers (3013 container). The 3013 container provides the primary barrier and pressure boundary preventing release of plutonium-bearing materials to the environment. The final closure (closure weld) of the 3013 container must be leaktight, structurally sound and meet DOE STD 3013 specified criteria. This paper focuses on the development, qualification and demonstration of the welding process for the closure welding of Hanford PFP 3013 outer containers

  13. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-05-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination.

  14. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination

  15. Closure for spent-fuel transport and storage containers

    International Nuclear Information System (INIS)

    Ahner, S.; Knackstedt, H.G.; Srostlik, P.

    1980-01-01

    The container has a transport closure and a shielding closure. This shielding closure consists of two pieces (double closure system), which can be fartened to one another like a bayonet fixing. A central motion of rotation is enough to open the closure. It can be done remote-controlled as well as manually. (DG) [de

  16. Closure Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    International Nuclear Information System (INIS)

    Campbell, K.B.

    2001-11-01

    This Closure Report provides the documentation for closure of the Central Nevada Test Area (CNTA) surface Corrective Action Unit (CAU) 417. The CNTA is located in Hot Creek Valley in Nye County, Nevada, approximately 22.5 kilometers (14 miles) west of U.S. State Highway 6 near the Moores Station historical site, and approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. A nuclear device for Project Faultless was detonated approximately 975 meters (3,200 feet) below ground surface on January 19, 1968, in emplacement boring UC-1 (Department of Energy, Nevada Operation Office [DOE/NV], 1997). CAU 417 consists of 34 Corrective Action Sites (CASs). Site closure was completed using a Nevada Department of Environmental Protection (NDEP) approved Corrective Action Plan (CAP) (DOE/NV, 2000) which was based on the recommendations presented in the NDEP-approved Corrective Action Decision Document (DOE/NV, 1999). Closure of CAU 417 was completed in two phases. Phase I field activities were completed with NDEP concurrence during 1999 as outlined in the Phase I Work Plan, Appendix A of the CAP (DOE/NV, 2000), and as summarized in Section 2.1.2 of this document

  17. Closure Report for Corrective Action Unit 426: Cactus Spring Waste Trenches, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Dave Madsen

    1998-08-01

    This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices. The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.

  18. Transitional nuclei near shell closures

    Energy Technology Data Exchange (ETDEWEB)

    Mukherjee, G. [Variable Energy Cyclotron Centre, 1/AF Bidhan Nagar, Kolkata 700064 (India); Pai, H. [Variable Energy Cyclotron Centre, 1/AF Bidhan Nagar, Kolkata 700064, India and Present Address: Institut für Kernphysik, Technische Universität Darmstadt, Schlossgartenstrasse 9, 64289 Darmstadt (Germany)

    2014-08-14

    High spin states in Bismuth and Thallium nuclei near the Z = 82 shell closure and Cesium nuclei near the N = 82 shell closure in A = 190 and A = 130 regions, respectively, have been experimentally investigated using heavy-ion fusion evaporation reaction and by detecting the gamma rays using the Indian National Gamma Array (INGA). Interesting shape properties in these transitional nuclei have been observed. The results were compared with the neighboring nuclei in these two regions. The total Routhian surface (TRS) calculations have been performed for a better understanding of the observed properties. In mass region A = 190, a change in shape from spherical to deformed has been observd around neutron number N = 112 for the Bi (Z = 83) isotopes with proton number above the magic gap Z = 82, whereas, the shape of Tl (Z = 81) isotopes with proton number below the magic gap Z = 82 remains stable as a function of neutron number. An important transition from aplanar to planar configuration of angular momentum vectors leading to the occurance of nuclar chirality and magnetic rotation, respectively, has been proposed for the unique parity πh{sub 11/2}⊗νh{sub 11/2} configuration in Cs isotopes in the mass region A ∼ 130 around neutron number N = 79. These results are in commensurate with the TRS calculations.

  19. Criticality assessment of LLRWDF closure

    International Nuclear Information System (INIS)

    Sarrack, A.G.; Weber, J.H.; Woody, N.D.

    1992-01-01

    During the operation of the Low Level Radioactive Waste Disposal Facility (LLRWDF), large amounts (greater than 100 kg) of enriched uranium (EU) were buried. This EU came primarily from the closing and decontamination of the Naval Fuels Facility in the time period from 1987--1989. Waste Management Operations (WMO) procedures were used to keep the EU boxes separated to prevent possible criticality during normal operation. Closure of the LLRWDF is currently being planned, and waste stabilization by Dynamic Compaction (DC) is proposed. Dynamic compaction will crush the containers in the LLRWDF and result in changes in their geometry. Research of the LLRWDF operations and record keeping practices have shown that the EU contents of trenches are known, but details of the arrangement of the contents cannot be proven. Reviews of the trench contents, combined with analysis of potential critical configurations, revealed that some portions of the LLRWDF can be expected to be free of criticality concerns while other sections have credible probabilities for the assembly of a critical mass, even in the uncompacted configuration. This will have an impact on the closure options and which trenches can be compacted

  20. Need for Closure, Gender and Social Self-Esteem of youngsters

    OpenAIRE

    I. VERMEIR; M. GEUENS

    2004-01-01

    High and low Need for Closure youngsters were compared on values and self-images related to social self-esteem. In addition, gender differences were researched. Results show that NFCL and gender significantly influence social self-esteem values like eagerness for approval and tranquility, achievement pressure and orientation, individualism, independency and appearance mindedness. NFCL and gender also affect youngster’s social esteem related self-images. In addition, interesting interaction ef...

  1. Determination of H2 Diffusion Rates through Various Closures on TRU Waste Bag-Out Bags

    International Nuclear Information System (INIS)

    Noll, Phillip D. Jr.; Callis, E. Larry; Norman, Kirsten M.

    1999-01-01

    The amount of H 2 diffusion through twist and tape (horse-tail), wire tie, plastic tie, and heat sealed closures on transuranic (TRU) waste bag-out bags has been determined. H 2 diffusion through wire and plastic tie closures on TRU waste bag-out bags has not been previously characterized and, as such, TRU waste drums containing bags with these closures cannot be certified and/or shipped to the Waste Isolation Pilot Plant (WIPP). Since wire ties have been used at Los Alamos National Laboratory (LANL) from 1980 to 1991 and the plastic ties from 1991 to the present, there are currently thousands of waste drums that cannot be shipped to the WIPP site. Repackaging the waste would be prohibitively expensive. Diffusion experiments performed on the above mentioned closures show that the diffusion rates of plastic tie and horse-tail closures are greater than the accepted value presented in the TRU-PACT 11 Safety Analysis Report (SAR). Diffusion rates for wire tie closures are not statistically different from the SAR value. Thus, drums containing bags with these closures can now potentially be certified which would allow for their consequent shipment to WIPP

  2. Redfield Energy Approval

    Science.gov (United States)

    This September 19, 2016 letter from EPA approves the petition from Poet Biorefining-Lake Crystal, regarding non-This October 27, 2016 letter from EPA approves the petition from Redfield Energy, LLC, regarding non-grandfathered ethanol produced

  3. How the Lean Management System is Working on a Closure Project - 13242

    Energy Technology Data Exchange (ETDEWEB)

    Mowery, Carol [Washington Closure Hanford, 2620 Fermi, Richland, Washington, 99354 (United States)

    2013-07-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  4. How the Lean Management System is Working on a Closure Project - 13242

    International Nuclear Information System (INIS)

    Mowery, Carol

    2013-01-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi 2 of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  5. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Silvas, A. J. [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site; Lantow, Tiffany A. [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site

    2015-03-25

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

  6. Wound complications after chemo-port placement in children: Does closure technique matter?

    Science.gov (United States)

    Muncie, Colin; Herman, Richard; Collier, Anderson; Berch, Barry; Blewett, Christopher; Sawaya, David

    2018-03-01

    Wound dehiscence after chemo-port placement is a rare but potentially significant complication. We hypothesize that by using a simple running skin closure technique during chemo-port placement the rate of wound dehiscence and overall wound complications can be significantly decreased. IRB approval was obtained and patients port from June 2012 to April 2016 were analyzed. Data collected on patients included patient demographics, skin closure type, and wound complications within 30days. Chi-square was performed to examine the univariate association with skin closure technique and wound dehiscence. Logistic regression was performed to examine the multivariable association between skin closure type and wound dehiscence and to compute odds ratios. There were 259 ports placed in this cohort: 125 used simple running skin closure technique, and 134 used the subcuticular skin closure. Patients were found to not have any difference in rate of dehiscence or overall wound complications based on gender, age, location of port, or use of steroids or chemotherapy within 1week of port placement. When compared, only 1 case (0.80%) in the simple running group vs 10 cases (7.46%) in the subcuticular group experienced a wound dehiscence [unadjusted OR=14.07 (1.69, 116.99) p=0.0144]. When comparing overall wound complications the simple running group had 3 (2.4%) versus 12 (8.96%) in the subcuticular group [unadjusted OR=4.78 (1.27, 17.94) p=0.0203]. When adjusting for port-number both dehiscence and overall wound complications remained statistically significant. We conclude that the simple running skin closure for chemo-port placement in children has superior outcomes in regards to prevention of dehiscence and overall wound related complications when compared to the subcuticular technique. Copyright © 2017 Elsevier Inc. All rights reserved.

  7. Hospital closure: Phoenix, Hydra or Titanic?

    Science.gov (United States)

    Dunne, T; Davis, S

    1996-01-01

    Very little has been published about the effects of hospital closure in terms of the service, financial or management issues of the process. Attempts through a case-study format to redress the balance and as such represents the reflections of practitioners who have recently undergone the experience of hospital closure and the often neglected issues arising both during and after the process.

  8. Key financial ratios can foretell hospital closures.

    Science.gov (United States)

    Lynn, M L; Wertheim, P

    1993-11-01

    An analysis of various financial ratios sampled from open and closed hospitals shows that certain leverage, liquidity, capital efficiency, and resource availability ratios can predict hospital closure up to two years in advance of the closure with an accuracy of nearly 75 percent.

  9. 40 CFR 264.178 - Closure.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Use and Management of Containers § 264.178 Closure. At closure, all hazardous waste and hazardous waste residues must be removed...

  10. Hanford Patrol Academy Demolition Sites Closure Plan

    International Nuclear Information System (INIS)

    1992-11-01

    From 1975 to 1991 the Hanford Patrol Academy Demolition Sites (HPADS) were used for demolition events. These demolition events were a form of thermal treatment for spent or abandoned chemical waste. Because the HPADS will no longer be used for this thermal activity, the sites will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and 40 CFR 270.1. Closure also will satisfy closure requirements of WAC 173-303-680 and for the thermal treatment closure requirements of 40 CFR 265.381. This closure plan presents a description of the HPADS, the history of the waste treated, and the approach that will be followed to close the HPADS. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. Only dangerous constituents derived from HPADS operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i). The HPADS are actually two distinct soil closure areas within the Hanford Patrol Academy training area

  11. Addendum to the post-closure permit application for the Bear Creek hydrogeologic regime at the Y-12 plant: Walk-in pits

    International Nuclear Information System (INIS)

    1995-04-01

    In June 1987, the Resource Conservation and Recovery Act (RCRA) Closure/Post-Closure Plan for the Bear Creek Burial Grounds (BCBG) located at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval.The Closure Plan has been modified and revised several times. This document is an addendum to the Post-Closure Permit Application submitted to TDEC in June, 1994. This addendum contains information on the Walk-In Pits of the BCBG which is meant to supplement the information provided in the Post-Closure Permit Application submitted for the BCBG. This document is not intended to be a stand-alone document.

  12. Some Recent Developments in Turbulence Closure Modeling

    Science.gov (United States)

    Durbin, Paul A.

    2018-01-01

    Turbulence closure models are central to a good deal of applied computational fluid dynamical analysis. Closure modeling endures as a productive area of research. This review covers recent developments in elliptic relaxation and elliptic blending models, unified rotation and curvature corrections, transition prediction, hybrid simulation, and data-driven methods. The focus is on closure models in which transport equations are solved for scalar variables, such as the turbulent kinetic energy, a timescale, or a measure of anisotropy. Algebraic constitutive representations are reviewed for their role in relating scalar closures to the Reynolds stress tensor. Seamless and nonzonal methods, which invoke a single closure model, are reviewed, especially detached eddy simulation (DES) and adaptive DES. Other topics surveyed include data-driven modeling and intermittency and laminar fluctuation models for transition prediction. The review concludes with an outlook.

  13. The clinical effects of closure of the hernia gap after laparoscopic ventral hernia repair:

    DEFF Research Database (Denmark)

    Christoffersen, Mette W; Westen, Mikkel; Assadzadeh, Sami

    2014-01-01

    randomised controlled trials. The primary purpose of this paper is to compare early post-operative activity-related pain in patients undergoing laparoscopic ventral hernia repair with closure of the gap with patients undergoing standard laparoscopic ventral hernia repair (non-closure of the gap). Secondary...... outcomes are patient-rated cosmesis and hernia-specific quality of life. METHODS: A randomised, controlled, double-blinded study is planned. Based on power calculation, we will include 40 patients in each arm. Patients undergoing elective laparoscopic umbilical, epigastric or umbilical trocar-site hernia...... repair at Hvidovre Hospital and Herlev Hospital, Denmark, are invited to participate. CONCLUSION: The gap closure technique may induce more post-operative pain than the non-closure repair, but it may also be superior with regard to other important surgical outcomes. No studies have previously...

  14. The urethral closure function in continent and stress urinary incontinent women assessed by urethral pressure reflectometry

    DEFF Research Database (Denmark)

    Saaby, Marie-Louise

    2014-01-01

    , the parameters showed highly significant negative correlation with ICIQ-SF, pad test and the number of incontinence episodes per week and are therefore valid as urodynamic severity measures. UPR in SUI women before and after TVT demonstrated a more efficient urethral closure function after the operation. The Po......-rest was unchanged suggesting that the sphincteric unit was virtually unaltered and hence the permanent closure forces unchanged. However, the resting opening elastance increased by 18% indicating that at the resting state the TVT somewhat improves the closure function by providing increased resistance against...... the dilation of the urethra, which probably explains the decreased maximum urine flow rate found after TVT in this and previous studies. The APIR increased in all patients after TVT suggesting that the support system was re-established and thus the adjunctive closure forces improved, regardless of the type...

  15. [Right patent ductus arteriosus with an ipsilateral aortic arch: percutaneous closure with amplatzer devices].

    Science.gov (United States)

    Santiago, Justo; Acuña, Manuel; Arispe, Elizabeth; Camargo, Ronaldo; Neves, Juliana; Arnoni, Daniel; Fontes, Valmir F; Pedra, Carlos A

    2007-03-01

    The association of a right aortic arch with an ipsilateral patent ductus arteriosus is rare, especially when there are no other intracardiac anomalies. We report three female patients aged 26, 35 and 9 years with this combination in whom previous attempts at surgical closure by thoracotomy and sternotomy were unsuccessful and who subsequently underwent successful percutaneous closure of the defects using Amplatzer devices. In two patients, although angiography demonstrated the presence of type-A patent ductus arteriosus, it was not possible to determine the minimum diameter accurately and it was necessary to measure it using a sizing balloon. An Amplatzer duct occluder was used in two patients and an Amplatzer muscular ventricular septal defect occluder, in the other. In all patients, full closure was confirmed in the catheterization laboratory and the patients were discharged on the same day with no complications. Percutaneous closure of a right patent ductus arteriosus associated with a right aortic arch is feasible, safe and effective.

  16. Closure Report for Corrective Action Unit 300: Surface Release Areas Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 300 is located in Areas 23, 25, and 26 of the Nevada Test Site, which is located approximately 65 miles northwest of Las Vegas, Nevada. CAU 300 is listed in the Federal Facility Agreement and Consent Order of 1996 as Surface Release Areas and is comprised of the following seven Corrective Action Sites (CASs), which are associated with the identified Building (Bldg): (sm b ullet) CAS 23-21-03, Bldg 750 Surface Discharge (sm b ullet) CAS 23-25-02, Bldg 750 Outfall (sm b ullet) CAS 23-25-03, Bldg 751 Outfall (sm b ullet) CAS 25-60-01, Bldg 3113A Outfall (sm b ullet) CAS 25-60-02, Bldg 3901 Outfall (sm b ullet) CAS 25-62-01, Bldg 3124 Contaminated Soil (sm b ullet) CAS 26-60-01, Bldg 2105 Outfall and Decon Pad The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 23-21-03, 23-25-02, and 23-25-03 is no further action. As a best management practice, approximately 48 feet of metal piping was removed from CAS 23-25-02 and disposed of as sanitary waste. The NDEP-approved corrective action alternative for CASs 25-60-01, 25-60-02, 25-62-01, and 26-60-01, is clean closure. Closure activities for these CASs included removing and disposing of soil impacted with total petroleum hydrocarbons-diesel range organics (TPH-DRO), polychlorinated biphenyls (PCBs), semivolatile organic compounds (SVOCs), and cesium (Cs)-137, concrete impacted with TPH-DRO, and associated piping impacted with TPH-DRO. CAU 300 was closed in accordance with the NDEP-approved CAU 300 Corrective Action Plan (CAP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006). The closure activities specified in the CAP were based on the recommendations presented in the CAU 300 Corrective Action Decision Document (NNSA/NSO, 2005). This Closure Report documents CAU 300 closure activities. During closure activities, approximately 40 cubic yards (yd3) of low-level waste consisting of TPH

  17. Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CAS 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd 3 of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd 3 of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd 3 of universal waste in the form of

  18. Closure Report for Corrective Action Unit 300: Surface Release Areas Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 300 is located in Areas 23, 25, and 26 of the Nevada Test Site, which is located approximately 65 miles northwest of Las Vegas, Nevada. CAU 300 is listed in the Federal Facility Agreement and Consent Order of 1996 as Surface Release Areas and is comprised of the following seven Corrective Action Sites (CASs), which are associated with the identified Building (Bldg): {sm_bullet} CAS 23-21-03, Bldg 750 Surface Discharge {sm_bullet} CAS 23-25-02, Bldg 750 Outfall {sm_bullet} CAS 23-25-03, Bldg 751 Outfall {sm_bullet} CAS 25-60-01, Bldg 3113A Outfall {sm_bullet} CAS 25-60-02, Bldg 3901 Outfall {sm_bullet} CAS 25-62-01, Bldg 3124 Contaminated Soil {sm_bullet} CAS 26-60-01, Bldg 2105 Outfall and Decon Pad The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 23-21-03, 23-25-02, and 23-25-03 is no further action. As a best management practice, approximately 48 feet of metal piping was removed from CAS 23-25-02 and disposed of as sanitary waste. The NDEP-approved corrective action alternative for CASs 25-60-01, 25-60-02, 25-62-01, and 26-60-01, is clean closure. Closure activities for these CASs included removing and disposing of soil impacted with total petroleum hydrocarbons-diesel range organics (TPH-DRO), polychlorinated biphenyls (PCBs), semivolatile organic compounds (SVOCs), and cesium (Cs)-137, concrete impacted with TPH-DRO, and associated piping impacted with TPH-DRO. CAU 300 was closed in accordance with the NDEP-approved CAU 300 Corrective Action Plan (CAP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006). The closure activities specified in the CAP were based on the recommendations presented in the CAU 300 Corrective Action Decision Document (NNSA/NSO, 2005). This Closure Report documents CAU 300 closure activities. During closure activities, approximately 40 cubic yards (yd3) of low-level waste consisting of TPH-DRO-, PCB

  19. Pit closures - effects and alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Stott, A G

    1987-02-01

    During the last decade, British Coal has closed around 100 mines. This article illustrates the effect of pit closures on the colliery's workforce, and the local community and its economy. Working conditions at Newmarket Colliery and the Selby coalfield are compared within the context of British Coal's national transfer market. British Coal's transfer benefits include resettlement payments and mortgage subsidies. The job creation venture of British Coal Enterprise Ltd. has helped to create over 3700 new jobs in 264 projects, involving a total investment of 38 M pounds sterling. The article also discusses deputies' qualifications and prospects for recently qualified management staff, and gives a comparison of losses suffered by the different mining unions.

  20. Closure for milliliter scale bioreactor

    Science.gov (United States)

    Klein, David L.; Laidlaw, Robert D.; Andronaco, Gregory; Boyer, Stephen G.

    2010-12-14

    A closure for a microreactor includes a cap that is configured to be inserted into a well of the microreactor. The cap, or at least a portion of the cap, is compliant so as to form a seal with the well when the cap is inserted. The cap includes an aperture that provides an airway between the inside of the well to the external environment when the cap is inserted into the well. A porous plug is inserted in the aperture, e.g., either directly or in tube that extends through the aperture. The porous plug permits gas within the well to pass through the aperture while preventing liquids from passing through to reduce evaporation and preventing microbes from passing through to provide a sterile environment. A one-way valve may also be used to help control the environment in the well.

  1. Closure of Microcosm for refurbishment

    CERN Multimedia

    2014-01-01

    Since 1994, the Microcosm exhibition has given the opportunity to visitors of all ages and backgrounds to have a first glimpse into the secrets of physics.   To ensure that Microcosm can continue fulfilling its educational aims at the same level of quality for many years to come, it is closing for renovation work on 8 December 2014 and is expected to reopen during Summer 2015. During the closure, the “Fun with Physics” workshop will not take place, but the Universe of Particles exhibition in the Globe and the Passport to the Big Bang circuit will remain accessible to the public, free of charge and with no need to book in advance.  Guided tours of CERN are also available (advance booking required via this page).

  2. Previously unknown species of Aspergillus.

    Science.gov (United States)

    Gautier, M; Normand, A-C; Ranque, S

    2016-08-01

    The use of multi-locus DNA sequence analysis has led to the description of previously unknown 'cryptic' Aspergillus species, whereas classical morphology-based identification of Aspergillus remains limited to the section or species-complex level. The current literature highlights two main features concerning these 'cryptic' Aspergillus species. First, the prevalence of such species in clinical samples is relatively high compared with emergent filamentous fungal taxa such as Mucorales, Scedosporium or Fusarium. Second, it is clearly important to identify these species in the clinical laboratory because of the high frequency of antifungal drug-resistant isolates of such Aspergillus species. Matrix-assisted laser desorption/ionization-time of flight mass spectrometry (MALDI-TOF MS) has recently been shown to enable the identification of filamentous fungi with an accuracy similar to that of DNA sequence-based methods. As MALDI-TOF MS is well suited to the routine clinical laboratory workflow, it facilitates the identification of these 'cryptic' Aspergillus species at the routine mycology bench. The rapid establishment of enhanced filamentous fungi identification facilities will lead to a better understanding of the epidemiology and clinical importance of these emerging Aspergillus species. Based on routine MALDI-TOF MS-based identification results, we provide original insights into the key interpretation issues of a positive Aspergillus culture from a clinical sample. Which ubiquitous species that are frequently isolated from air samples are rarely involved in human invasive disease? Can both the species and the type of biological sample indicate Aspergillus carriage, colonization or infection in a patient? Highly accurate routine filamentous fungi identification is central to enhance the understanding of these previously unknown Aspergillus species, with a vital impact on further improved patient care. Copyright © 2016 European Society of Clinical Microbiology and

  3. Evaluation of proposed panel closure modifications at WIPP

    Energy Technology Data Exchange (ETDEWEB)

    Allen, Lawrence E.; Silva, Matthew K.; Channell, James K.; Abel, John F.; Morgan, Dudley R.

    2001-12-31

    A key component in the design of the WIPP repository is the installation of concrete structures as panel seals in the intake and exhaust drifts after a panel has been filled with waste containers. As noted in the EPA final rule, the panel seal closure system is intended to block brine flow between the waste panels at the WIPP. On April 17, 2001, the DOE proposed seven modifications to the EPA concerning the design of the panel closure system. EPA approval of these modifications is necessary since the details of the panel design are specified in EPA’s final rule as a condition for WIPP certification. However, the EPA has not determined whether a rulemaking would be required for these proposed design modifications. On September 4, 2001, the DOE withdrew the request, noting that it would be resubmitted on a future date. The Environmental Evaluation Group (EEG) contracted with two engineers, Dr. John Abel and Dr. Rusty Morgan, to evaluate the proposed modifications. The EEG has accepted the conclusions and recommendations from these two experts: 1) replacement of Salado Mass Concrete with a generic salt-based concrete; 2) replacement of the explosion wall with a construction wall; 3) replacement of freshwater grouting with salt-based grouting; 4) option to allow surface or underground mixing; and 5) option to allow up to one year for completion of closure. The proposed modification to allow local carbonate river rock as aggregate is acceptable pending demonstration that no problems will exist in the resulting concrete. The proposed modification to give the contractor discretion in removal of steel forms is not supported. Instead, several recommendations are made to specifically reduce the number of forms left, thereby reducing potential migration pathways.

  4. Incorporating Sustainability into Site Closure - A Field Example

    Science.gov (United States)

    Austrins, L. M.; West, J.

    2013-12-01

    Long term management of former chemical production facilities can be a costly and time consuming element of site closure, however, implementation of creative measures to introduce sustainability and reduce the need for onsite presence can be successfully incorporated into the site closure process. A case study demonstrating this involves a facility located in Sarnia, Ontario, which was an active multi chemical production facility from the 1940s, until it was decommissioned and sold between 2005 and 2010. The facility consisted of 322 acres of production areas. Several elements which allowed for reduced onsite presence and lower management costs were incorporated into the site decommissioning plan, including; phased remediation planning, and selection of sustainable components as part of remediation, surface water management, and groundwater management. The sustainability and management modifications were successfully negotiated and approved by the local regulatory agency. Due to the size and complexity of the site, a holistic approach for the facility was needed and included the development of a comprehensive decision matrix. Each remediation alternative incorporated sustainable practices. Ex-situ remediation consisted of excavation of contaminated subsurface medium and consolidation at a 4.7 acre onsite soil treatment area designed specifically for the site closure process. In-situ remediation consisted of injection of amendment into the native soils using hydraulic fracture and injection. When the plant was an active operating facility, groundwater management required active pumping and groundwater treatment through a series of carbon treatment units. Active pumping has been replaced by passive hydraulic control through the use of tree plantations.

  5. Nickel elution properties of contemporary interatrial shunt closure devices.

    Science.gov (United States)

    Verma, Divya Ratan; Khan, Muhammad F; Tandar, Anwar; Rajasekaran, Namakkal S; Neuharth, Renée; Patel, Amit N; Muhlestein, Joseph B; Badger, Rodney S

    2015-02-01

    We sought to compare nickel elution properties of contemporary interatrial shunt closure devices in vitro. There are two United States Food and Drug Administration (FDA)-approved devices for percutaneous closure of secundum atrial septal defect: the Amplatzer septal occluder (ASO; St Jude Medical Corporation) and Gore Helex septal occluder (HSO; W.L. Gore & Associates). The new Gore septal occluder (GSO) device is in clinical trials. These are also used off-label for patent foramen ovale closure in highly selected patients. These devices have high nickel content. Nickel allergy is the most common reason for surgical device explantation. Nickel elution properties of contemporary devices remain unknown. We compared nickel elution properties of 4 devices - ASO, GSO, HSO, and sternal wire (SW) - while Dulbecco's phosphate-buffered saline (DPBS) served as control. Three samples of each device were submerged in DPBS. Nickel content was measured at 14 intervals over 90 days. Nickel elution at 24 hours, compared to control (0.005 ± 0.0 mg/L), was significantly higher for ASO (2.98 ± 1.65 mg/L; P=.04) and SW (0.03 ± 0.014 mg/L; P=.03). Nickel levels at 90 days, compared to control (0.005 ± 0.0 mg/L) and adjusting for multiple comparisons, were significantly higher for ASO (19.80 ± 2.30 mg/L; P=.01) and similar for HSO (P=.34), GSO (P=.34), and SW (P=.34). ASO had significantly higher nickel elution compared to HSO, GSO, and SW (P=.01). There is substantial variability in nickel elution; devices with less exposed nickel (HSO and GSO) have minimal elution. The safety of low nickel elution devices in patients with nickel allergy needs to be evaluated in prospective trials.

  6. A COMPARATIVE STUDY OF SINGLE VERSUS DOUBLE LAYER CLOSURE ON LOWER SEGMENT CAESAREAN SCAR

    Directory of Open Access Journals (Sweden)

    Kirtirekha Mohapatra

    2016-10-01

    Full Text Available BACKGROUND There are few issues in modern obstetrics that have been as controversial as management of a woman with a prior caesarean delivery. Hence, it is required to have evidence based correct practice of this surgical procedure. Healing of the uterine incision and the strength of the scar should be the most important consideration. The aim of the study is to compare the effect of technique of uterine closure (Single Layer vs. Double Layer on subsequent pregnancies and to find out, which technique has a better maternal and neonatal outcome by strengthening the scar. MATERIALS AND METHODS 500 cases of previous caesarean section pregnancies were taken, 250 from single layer closure group and 250 from double layer closure group. The mode of delivery during present pregnancy was noted. Integrity of scar, thickness of scar, presence of adhesion were documented. The neonates were observed. Results were compared so as to draw an inference about the better method. RESULTS Mean age between the two groups were similar. Majority did not have history of premature rupture of membrane during previous pregnancy. Postoperative complications were more when double layer closure of uterine scar was done in index surgery. Interpregnancy gap of <3 years was more commonly present in double layer closure group (52.8% in double layer versus 34.8% in single layer. Single layer had more scar tenderness (21.2%, thinned out scars (34.6%, incomplete ruptures (7.1% and complete ruptures (2.8% than double layer closure group. Neonatal outcomes were not statistically different in both the groups. CONCLUSION Double layer uterine closure seems to have better impact on scar integrity as compared to single layer uterine closure.

  7. Gravitational closure of matter field equations

    Science.gov (United States)

    Düll, Maximilian; Schuller, Frederic P.; Stritzelberger, Nadine; Wolz, Florian

    2018-04-01

    The requirement that both the matter and the geometry of a spacetime canonically evolve together, starting and ending on shared Cauchy surfaces and independently of the intermediate foliation, leaves one with little choice for diffeomorphism-invariant gravitational dynamics that can equip the coefficients of a given system of matter field equations with causally compatible canonical dynamics. Concretely, we show how starting from any linear local matter field equations whose principal polynomial satisfies three physicality conditions, one may calculate coefficient functions which then enter an otherwise immutable set of countably many linear homogeneous partial differential equations. Any solution of these so-called gravitational closure equations then provides a Lagrangian density for any type of tensorial geometry that features ultralocally in the initially specified matter Lagrangian density. Thus the given system of matter field equations is indeed closed by the so obtained gravitational equations. In contrast to previous work, we build the theory on a suitable associated bundle encoding the canonical configuration degrees of freedom, which allows one to include necessary constraints on the geometry in practically tractable fashion. By virtue of the presented mechanism, one thus can practically calculate, rather than having to postulate, the gravitational theory that is required by specific matter field dynamics. For the special case of standard model matter one obtains general relativity.

  8. IDENTIFICATION OF DOE'S POST-CLOSURE MONITORING NEEDS AND REQUIREMENTS

    Energy Technology Data Exchange (ETDEWEB)

    M.A. Ebadian, Ph.D.

    1999-01-01

    The 2006 plan sets an ambitious agenda for the U.S. Department of Energy (DOE), Office of Environmental Management (EM) and the remediation of sites contaminated by decades of nuclear weapons production activities. The plan's primary objective is to reduce overall clean up costs by first eliminating the environmental problems that are most expensive to control and safely maintain. In the context of the 2006 Plan, closure refers to the completion of area or facility specific cleanup projects. The cleanup levels are determined by the planned future use of the site or facility. Use restrictions are still undecided for most sites but are highly probable to exclude residential or agricultural activities. Most of the land will be remediated to ''industrial use'' levels with access restrictions and some areas will be closed-off through containment. Portions of the site will be reserved for waste disposal, either as a waste repository or the in-situ immobilization of contaminated soil and groundwater, and land use will be restricted to waste disposal only. The land used for waste disposal will require monitoring and maintenance activities after closure. Most of the land used for industrial use may also require such postclosure activities. The required postclosure monitoring and maintenance activities will be imposed by regulators and stakeholders. Regulators will not approve closure plans without clearly defined monitoring methods using approved technologies. Therefore, among all other more costly and labor-intensive closure-related activities, inadequate planning for monitoring and lack of appropriate monitoring technologies can prevent closure. The purpose of this project is to determine, document, and track the current and evolving postclosure monitoring requirements at DOE-EM sites. This information will aid CMST-CP in guiding its postclosure technology development and deployment efforts.

  9. Social and macro economic impact of closure

    International Nuclear Information System (INIS)

    Medeliene, D.

    1999-01-01

    The social consequences of closure of Ignalina NPP will largely depend on the actions the Government takes. If it puts in place the conditions which enable the International Financial Institutions to assist Lithuania, both in providing loans and grants for decommissioning and (in the case of the EU) providing Structural Adjustment Funds for the regional economic development of the Visaginas area, then solutions to the problems of closure can be found. But if the Government delays putting into place the necessary conditions, then Lithuania will be left to solve the problems of - inter alia necessary - closure of Ignalina NPP on its own. (author)

  10. Sternocleidomastoid flap augmentation of the pharyngeal closure after total laryngectomy.

    Science.gov (United States)

    Ibrahim, Sherif Gabr; Wahba, Basim Metwally; Elbatawi, Ahmed Mahmoud; Eltelety, Ahmad Mohamed

    2017-08-01

    The objective of the study was to evaluate the effect of sternocleidomastoid (SCM) flap augmentation of the pharyngeal closure after total laryngectomy on the incidence of pharyngocutaneous fistula (PCF). Thirty patients with T4a laryngeal carcinoma and none of them receiving primary radiotherapy previously were divided into two equal groups. Group A patients had SCM flap augmentation of the pharyngeal closure after total laryngectomy. Group B patients had the standard pharyngeal closure without augmentation. Both groups were followed up for 30 days postoperatively for the development of PCF. The use of the SCM added about extra 15 min to the surgical procedure in all patients (p laryngectomy. Three patients in each group developed PCF either early (10 days or less postoperatively) or late (more than 10 days but less than 30 days postoperatively). There was no statistically significant difference in the length of hospital stay between the two groups. The use of SCM flap did not reduce the incidence of PCF after total laryngectomy.

  11. Economic evaluation of closure CAP barrier materials Volume I and Volume II

    International Nuclear Information System (INIS)

    Serrato, M.G.; Bhutani, J.S.; Mead, S.M.

    1993-09-01

    This study prepared by the Site Geotechnical Services (SGS) and Environmental Restoration (ER) departments of the WSRC evaluates a generic closure cover system for a hazardous waste site, using 10 different surface areas, ranging from 0.1 acre to 80 acres, and 12 barrier materials. This study presents a revision to the previous study (Rev. 0) published in June 1993, under the same title. The objective of this study was to revise the previous study by incorporating four additional site sizes into the evaluation process and identifying the most cost-effective barrier material for a given closure cover system at the SRS

  12. Treatment of sternal wound infection with vacuum-assisted closure.

    Science.gov (United States)

    Dezfuli, Bobby; Li, Chin-Shang; Young, J Nilas; Wong, Michael S

    2013-02-01

    Previous work has demonstrated the efficacy of vacuum-assisted closure (VAC) in the treatment of poststernotomy local wound infections, compared to historical treatment protocol. The negative pressure has been found to protect wounds against contamination, prevent wound fluid retention, increase blood flow, and increase rates of granulation tissue formation. For this study, a retrospective analysis compared patients receiving VAC as definitive treatment versus bridging to delayed flap closure. Sixteen patients developed sternal wound infections after cardiac surgeries at the authors' institution from 2006 to 2008. Data was gathered regarding patient comorbidities, treatment method, and outcome. Study objectives included assessment of risk factors that warranted secondary surgicalclosure and examination of long-term followup where VAC was thedefinitive treatment modality. Group A (n = 12) had VAC as the final treatment modality. Group B (n = 4) required myocutaneous flap closure. One patient in Group B passed away prior to flap surgery. Both groups had similar risk factors, except Group B had a higher risk of body mass index (BMI) > 35 that was near statistically significant (P = 0.085; odds ratio = 0.0, 95% CI = [0.0 - 1.21]). Group A required a shorter hospital stay on average. Long-term follow-up showed the majority of Group A had completely healed sternal wounds 2-3 years from initial cardiac surgery. Vacuum-assisted closure as definitive treatment modality is a successful, first line therapy for local superficial sternal wound infections. When deep infections occur, however, VAC as bridge-to-flap coverage is recommended over attempted secondary healing with VAC. .

  13. 75 FR 15645 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Emission...

    Science.gov (United States)

    2010-03-30

    ... clarify EPA's role in the approval of emission quantification protocols. While the previous SIP- approved... approve severable portions of two revisions to the Texas State Implementation Plan (SIP) submitted by the... to further clarify procedures for using emission protocols and to update the approved list of...

  14. Post-Closure Inspection Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench Tonopah Test Range, Nevada, Calendar Year 2000

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2001-06-01

    Post-closure monitoring requirements for the Roller Coaster Sewage Lagoons and North Disposal Trench (Corrective Action Unit [CAW 404]) (Figure 1) are described in Closure Report for Corrective Action Unit 404, Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada, report number DOE/NV--187. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. Post-closure monitoring at CAU 404 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

  15. Post-Closure Inspection Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench Tonopah Test Range, Nevada, Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure monitoring requirements for the Roller Coaster Sewage Lagoons and North Disposal Trench (Corrective Action Unit[CAW 404]) (Figure 1) are described in Closure Report for Corrective Action Unit 404, Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada, report number DOE/NV-187. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. Post-closure monitoring at CAU 404 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C

  16. Fenestrated Transcatheter ASD Closure in Adults with Diastolic Dysfunction and/or Pulmonary Hypertension: Case Series and Review of the Literature.

    Science.gov (United States)

    Abdelkarim, Ayman; Levi, Daniel S; Tran, Bao; Ghobrial, Joanna; Aboulhosn, Jamil

    2016-12-01

    This study aims to evaluate the safety and efficacy of transcatheter fenestrated ASD closure and to summarize the literature regarding the published techniques and outcomes of transcatheter partial ASD closure. Patients with left ventricular diastolic dysfunction (LVDD) or right ventricular (RV) dysfunction and/or pulmonary hypertension (PHT) may suffer untoward consequences of complete closure of an ostium secundum atrial septal defect (ASD). Therefore, for patients that fall under these categories we suggest partial occlusion of the defect, which may be better tolerated than complete defect closure. After obtaining IRB approval, a search for patients that have undergone percutaneous ASD closure was performed in the Ahmanson/UCLA Adult Congenital Heart Disease Center database to identify which patients received a fenestrated ASD closure device. Eight consecutive patients ranging between 22 and 83 years of age (mean 48 years) with PHT and/or LVDD or RV dysfunction who underwent fenestrated transcatheter ASD closure at UCLA were identified. None of the subjects experienced complications related to the procedure. Postprocedure clinical evaluation showed improvement in symptoms and exercise capacity. Available follow-up transthoracic echocardiography data (mean 4 months, range 0-20 months) demonstrated patent fenestrations in four of eight patients. None of the patients had thromboembolic or infectious complications and there were no device migrations, erosions or embolizations. Partial ASD occlusion in patients with diastolic dysfunction or RV dysfunction and/or PHT is safe and may be better tolerated than complete ASD closure in selected patients. © 2016 Wiley Periodicals, Inc.

  17. 2101-M pond closure plan

    International Nuclear Information System (INIS)

    1993-06-01

    This document describes activities for the closure of a surface impoundment (2101-M Pond) at the Hanford Site. The 2101-H Pond was initially constructed in 1953 to serve as a drainage collection area for the 2101-H Building. (Until the Basalt Waste Isolation Project (BWIP) Laboratory was constructed in the 2101-M Building in 1979--1981, the only source contributing discharge to the pond was condensate water from the 2101-H Building heating, ventilation, and air conditioning (HVAC) system. The drains for the BWIP Laboratory rooms were plumbed into a 4-in., cast-iron, low-pressure drain pipe that carries waste water from the HVAC system to the pond. During the active life of the BWIP Laboratory, solutions of dissolved barium in groundwater samples were discharged to the 2101-M Pond via the laboratory drains. As a result of the discharges, a Part A permit application was initially submitted to the Washington State Department of Ecology (Ecology) in August 1986 which designates the 2101-M Pond as a surface impoundment

  18. Cyanoacrylate for Intraoral Wound Closure: A Possibility?

    Directory of Open Access Journals (Sweden)

    Parimala Sagar

    2015-01-01

    Full Text Available Wound closure is a part of any surgical procedure and the objective of laceration repair or incision closure is to approximate the edges of a wound so that natural healing process may occur. Over the years new biomaterials have been discovered as an alternate to conventional suture materials. Cyanoacrylate bioadhesives are one among them. They carry the advantages of rapid application, patient comfort, resistance to infection, hemostatic properties, and no suture removal anxiety. Hence this study was undertaken to study the effect of long chain cyanoacrylate as an adhesive for intraoral wound closure and also to explore its hemostatic and antibacterial effects. Isoamyl-2-cyanoacrylate (AMCRYLATE was used as the adhesive in the study. In conclusion isoamyl cyanoacrylate can be used for intraoral wound closure, as an alternative to sutures for gluing the mucoperiosteum to bone, for example, after impaction removal, periapical surgeries, and cleft repair. Its hemostatic and antibacterial activity has to be further evaluated.

  19. Reliability assessment of underground shaft closure

    International Nuclear Information System (INIS)

    Fossum, A.F.; Munson, D.E.

    1994-01-01

    The intent of the WIPP, being constructed in the bedded geologic salt deposits of Southeastern New Mexico, is to provide the technological basis for the safe disposal of radioactive Transuranic (TRU) wastes generated by the defense programs of the United States. In determining this technological basis, advanced reliability and structural analysis techniques are used to determine the probability of time-to-closure of a hypothetical underground shaft located in an argillaceous salt formation and filled with compacted crushed salt. Before being filled with crushed salt for sealing, the shaft provides access to an underground facility. Reliable closure of the shaft depends upon the sealing of the shaft through creep closure and recompaction of crushed backfill. Appropriate methods are demonstrated to calculate cumulative distribution functions of the closure based on laboratory determined random variable uncertainty in salt creep properties

  20. Natural orifice transluminal endoscopic surgery gastrotomy closure with an over-the-endoscope clip: a randomized, controlled porcine study (with videos).

    Science.gov (United States)

    von Renteln, Daniel; Schmidt, Arthur; Vassiliou, Melina C; Gieselmann, Maria; Caca, Karel

    2009-10-01

    Secure endoscopic closure of transgastric natural orifice transluminal endoscopic surgery (NOTES) access is of paramount importance. The over-the-scope clip (OTSC) system has previously been shown to be effective for NOTES gastrotomy closure. To compare OTSC gastrotomy closure with surgical closure. Randomized, controlled animal study. Animal facility laboratory. Thirty-six female domestic pigs. Gastrotomies were created by using a needle-knife and an 18-mm balloon. The animals were subsequently randomized to either open surgical repair with interrupted sutures or endoscopic repair with 12-mm OTSCs. In addition, pressurized leak tests were performed in ex vivo specimens of 18-mm scalpel incisions closed with suture (n = 14) and of intact stomachs (n = 10). The mean time for endoscopic closure was 9.8 minutes (range 3-22, SD 5.5). No complications occurred during either type of gastrotomy closure. At necropsy, examination of all OTSC and surgical closures demonstrated complete sealing of gastrotomy sites without evidence of injury to adjacent organs. Pressurized leak tests showed a mean burst pressure of 83 mm Hg (range 30-140, SD 27) for OTSC closures and 67 mm Hg (range 30-130, SD 27.7) for surgical sutures. Ex vivo hand-sewn sutures of 18-mm gastrotomies (n = 14) exhibited a mean burst pressure of 65 mm Hg (range 20-140, SD 31) and intact ex vivo stomachs (n = 10) had a mean burst pressure of 126 mm Hg (range 90-170, SD 28). The burst pressure of ex vivo intact stomachs was significantly higher compared with OTSC closures (P < .01), in vivo surgical closures (P < .01), and ex vivo hand-sewn closures (P < .01). There was a trend toward higher burst pressures in the OTSC closures compared with surgical closures (P = .063) and ex vivo hand-sewn closures (P = .094). In vivo surgical closures demonstrated similar burst pressures compared with ex vivo hand-sewn closures (P = .848). Nonsurvival setting. Endoscopic closure by using the OTSC system is comparable to

  1. 32 CFR 989.25 - Base closure and realignment.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Base closure and realignment. 989.25 Section 989... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure...

  2. Transcatheter closure of ventricular septal defect with Occlutech Duct Occluder.

    Science.gov (United States)

    Atik-Ugan, Sezen; Saltik, Irfan Levent

    2018-04-01

    Patent ductus arteriosus occluders are used for transcatheter closure of ventricular septal defects, as well as for closure of patent ductus arteriosus. The Occlutech Duct Occluder is a newly introduced device for transcatheter closure of patent ductus arteriosus. Here, we present a case in which the Occlutech Duct Occluder was successfully used on a patient for the closure of a perimembraneous ventricular septal defect.

  3. Occupancy estimation and the closure assumption

    Science.gov (United States)

    Rota, Christopher T.; Fletcher, Robert J.; Dorazio, Robert M.; Betts, Matthew G.

    2009-01-01

    1. Recent advances in occupancy estimation that adjust for imperfect detection have provided substantial improvements over traditional approaches and are receiving considerable use in applied ecology. To estimate and adjust for detectability, occupancy modelling requires multiple surveys at a site and requires the assumption of 'closure' between surveys, i.e. no changes in occupancy between surveys. Violations of this assumption could bias parameter estimates; however, little work has assessed model sensitivity to violations of this assumption or how commonly such violations occur in nature. 2. We apply a modelling procedure that can test for closure to two avian point-count data sets in Montana and New Hampshire, USA, that exemplify time-scales at which closure is often assumed. These data sets illustrate different sampling designs that allow testing for closure but are currently rarely employed in field investigations. Using a simulation study, we then evaluate the sensitivity of parameter estimates to changes in site occupancy and evaluate a power analysis developed for sampling designs that is aimed at limiting the likelihood of closure. 3. Application of our approach to point-count data indicates that habitats may frequently be open to changes in site occupancy at time-scales typical of many occupancy investigations, with 71% and 100% of species investigated in Montana and New Hampshire respectively, showing violation of closure across time periods of 3 weeks and 8 days respectively. 4. Simulations suggest that models assuming closure are sensitive to changes in occupancy. Power analyses further suggest that the modelling procedure we apply can effectively test for closure. 5. Synthesis and applications. Our demonstration that sites may be open to changes in site occupancy over time-scales typical of many occupancy investigations, combined with the sensitivity of models to violations of the closure assumption, highlights the importance of properly addressing

  4. Factors affecting closure of a temporary stoma.

    Science.gov (United States)

    Taylor, Claire; Varma, Sarah

    2012-01-01

    The purpose of the study was to examine time to reversal of a temporary ostomy, reasons for delayed closure, and patient satisfaction with the scheduling of their closure and related hospital care. Cross-sectional, descriptive study. The target population comprised patients who underwent creation of a temporary ostomy and reversal surgery within one National Health System Hospital Trust in the United Kingdom. The population served by this Trust are ethnically and socioeconomically diverse, predominantly living in urban areas around Greater London. Sixty-one persons who met inclusion criteria were identified. A two-step analytical process was undertaken. First, a literature review examining incidence and causes of delayed stoma closure was undertaken. Second, a postal survey of all patients who had had their stoma closed in 2009 was conducted. Respondents were allowed 2 weeks to complete and return the questionnaire. The survey instrument was developed locally and subjected to content validation using ostomy patients, surgical and nursing colleagues. It consisted of 9 questions querying time from original surgery to closure, reasons for delaying closure surgery beyond 12 weeks, and satisfaction with care. Twenty-seven patients returned their questionnaires, indicating they consented to participate; a response rate of 44%. Half of the respondents (n = 14 [52%]) underwent closure surgery within 6 months of stoma formation; the remaining 48% waited more than 6 months (median: 6.5 months, range: 1.5-26 months). Thirteen patients (48%) reported a delay in receiving their stoma closure; the main reason cited was the need for a course of adjuvant postoperative chemotherapy. Three quarters of respondents (22 [74%]) were satisfied with the overall care they received. Findings from this study suggest that stoma closure may be associated with fewest complications if performed before 12 weeks.

  5. Exceptional closure of UNIQA office at CERN

    CERN Multimedia

    HR Department

    2009-01-01

    The UNIQA office at CERN will be closed from Wednesday 18 February to Friday 20 February due to painting work. During this closure, the Headquarters of UNIQA in Geneva will remain at the disposal of the members. See details https://cern.ch/chis/UNIQA_Offices.asp The CERN office will re-open on Monday 23 February according to the normal schedule. We apologise for any inconvenience caused by this closure.

  6. ASD Closure in Structural Heart Disease.

    Science.gov (United States)

    Wiktor, Dominik M; Carroll, John D

    2018-04-17

    While the safety and efficacy of percutaneous ASD closure has been established, new data have recently emerged regarding the negative impact of residual iatrogenic ASD (iASD) following left heart structural interventions. Additionally, new devices with potential advantages have recently been studied. We will review here the potential indications for closure of iASD along with new generation closure devices and potential late complications requiring long-term follow-up. With the expansion of left-heart structural interventions and large-bore transseptal access, there has been growing experience gained with management of residual iASD. Some recently published reports have implicated residual iASD after these procedures as a potential source of diminished clinical outcomes and mortality. Additionally, recent trials investigating new generation closure devices as well as expanding knowledge regarding late complications of percutaneous ASD closure have been published. While percutaneous ASD closure is no longer a novel approach to managing septal defects, there are several contemporary issues related to residual iASD following large-bore transseptal access and new generation devices which serve as an impetus for this review. Ongoing attention to potential late complications and decreasing their incidence with ongoing study is clearly needed.

  7. Percutaneous Transcatheter PDA Device Closure in Infancy

    International Nuclear Information System (INIS)

    Ullah, M.; Sultan, M.; Akhtar, K.; Sadiq, N.; Akbar, H.

    2014-01-01

    Objective: To evaluate the results and complications associated with transcatheter closure of patent ductus arteriosus (PDA) in infants. Study Design: Quasi-experimental study. Place and Duration of Study: Paediatric Cardiology Department of Armed Forces Institute of Cardiology / National Institute of Heart Diseases (AFIC/NIHD), Rawalpindi, from December 2010 to June 2012. Methodology: Infants undergoing transcatheter device closure of PDA were included. All patients were evaluated by experienced Paediatric Cardiologists with 2-D echocardiography and Doppler before the procedure. Success of closure and complications were recorded. Results: The age of patients varied from 05 - 12 months and 31 (56.4%) were females. Out of the 55 infants, 3 (5.4%) were not offered device closure after aortogram (two large tubular type ducts and one tiny duct, considered unsuitable for device closure); while in 50 (96.1%) patients out of remaining 52, the duct was successfully closed with transcatheter PDA device or coil. In one infant, device deployment resulted in acquired coarctation, necessitating device retrieval by Snare followed by surgical duct interruption and another patient had non-fatal cardiac arrest during device deployment leading to abandonment of procedure and subsequent successful surgical interruption. Local vascular complications occurred in 12 (21.8%) of cases and all were satisfactorily treated. Conclusion: Transcatheter device closure of PDA in infants was an effective procedure in the majority of cases; however, here were considerable number of local access site vascular complications. (author)

  8. 105-DR Large Sodium Fire Facility closure activities evaluation report

    International Nuclear Information System (INIS)

    Adler, J.G.

    1996-01-01

    This report evaluates the closure activities at the 105-DR Large Sodium Fire Facility. The closure activities discussed include: the closure activities for the structures, equipment, soil, and gravel scrubber; decontamination methods; materials made available for recycling or reuse; and waste management. The evaluation compares these activities to the regulatory requirements and closure plan requirements. The report concludes that the areas identified in the closure plan can be clean closed

  9. Closure Letter Report for Corrective Action Unit 496: Buried Rocket Site - Antelope Lake (TTR)

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    A Streamlined Approach for Environmental Restoration (SAFER) Plan for investigation and closure of CAU 496, Corrective Action Site (CAS) TA-55-008-TAAL (Buried Rocket), at the Tonopah Test Range (TTR), was approved by the Nevada Department of Environmental Protection (NDEP) on July 21,2004. Approval to transfer CAS TA-55-008-TAAL from CAU 496 to CAU 4000 (No Further Action Sites) was approved by NDEP on December 21, 2005, based on the assumption that the rocket did not present any environmental concern. The approval letter included the following condition: ''NDEP understands, from the NNSA/NSO letter dated November 30,2005, that a search will be conducted for the rocket during the planned characterization of other sites at the Tonopah Test Range and, if found, the rocket will be removed as a housekeeping measure''. NDEP and U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office personnel located the rocket on Mid Lake during a site visit to TTR, and a request to transfer CAS TA-55-008-TAAL from CAU 4000 back to CAU 496 was approved by NDEP on September 11,2006. CAS TA-55-008-TAAL was added to the ''Federal Facility Agreement and Consent Order'' of 1996, based on an interview with a retired TTR worker in 1993. The original interview documented that a rocket was launched from Area 9 to Antelope Lake and was never recovered due to the high frequency of rocket tests being conducted during this timeframe. The interviewee recalled the rocket being an M-55 or N-55 (the M-50 ''Honest John'' rocket was used extensively at TTR from the 1960s to early 1980s). A review of previously conducted interviews with former TTR personnel indicated that the interviewees confused information from several sites. The location of the CAU 496 rocket on Mid Lake is directly south of the TTR rocket launch facility in Area 9 and is consistent with information gathered on the lost rocket during recent interviews. Most pertinently, an interview in 2005 with a

  10. Primary closure in colon trauma.

    Science.gov (United States)

    Salinas-Aragón, Luis Enrique; Guevara-Torres, Lorenzo; Vaca-Pérez, Enrique; Belmares-Taboada, Jaime Arístides; Ortiz-Castillo, Fátima de Guadalupe; Sánchez-Aguilar, Martín

    2009-01-01

    Primary repair of colon injuries is an accepted therapeutic option; however, controversy persists regarding its safety. Our objective was to report the evolution and presence of complications in patients with colon injury who underwent primary closure and to determine if the time interval (>6 h), degree of injury, contamination, anatomic site injured, PATI (Penetrating Abdominal Trauma Index) >25, and the presence of other injuries in colon trauma are associated with increased morbidity and mortality. This was a prospective, observational, longitudinal and descriptive study conducted at the Central Hospital "Dr. Ignacio Morones Prieto," San Luis Potosí, Mexico, from January 1, 2003 to December 31, 2007. We included patients with abdominal trauma with colon injury subjected to surgical treatment. chi(2) was used for basic statistical analysis. There were 481 patients with abdominal trauma who underwent surgery; 77(16.1%) had colon injury. Ninety percent (n = 69) were treated in the first 6 h; 91% (n = 70) were due to penetrating injuries, and gunshot wound accounted for 48% (n = 37). Transverse colon was the most frequently injured (38%) (n = 29). Grade I and II injuries accounted for 75.3% (n = 58). Procedures included primary repair (76.66 %) (n = 46); resection with anastomosis (8.3%) (n = 5); and colostomy (15%) (n = 9). Associated injuries were present in 76.6% (n = 59). There was some degree of contamination in 85.7% (n = 66); 82.8% (58) had PATI colon injury. Primary repair is a safe procedure for treatment of colon injuries. Patients with primary repair had lower morbidity (p <0.009). Surgery during the first 6 h (p <0.006) and in hemodynamically stable patients (p <0.014) had a lower risk of complications.

  11. Accelerating cleanup: Paths to closure

    International Nuclear Information System (INIS)

    1998-06-01

    This report describes the status of Environmental Management's (EM's) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE's 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM's accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document

  12. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents of concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern

  13. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents of concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.

  14. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA

    International Nuclear Information System (INIS)

    BECHTEL NEVADA

    2005-01-01

    This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CAS 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls

  15. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA

    2005-12-01

    This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CAS 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.

  16. 40 CFR 264.228 - Closure and post-closure care.

    Science.gov (United States)

    2010-07-01

    ... remaining wastes to a bearing capacity sufficient to support final cover; and (iii) Cover the surface....112 must include both a plan for complying with paragraph (a)(1) of this section and a contingent plan... practicably removed at closure; and (ii) The owner or operator must prepare a contingent post-closure plan...

  17. Post-operative analgesic requirement in non-closure and closure of peritoneum during open appendectomy

    International Nuclear Information System (INIS)

    Khan, A.W.; Maqsood, R.; Saleem, M.M.

    2017-01-01

    To compare the mean post-operative analgesic requirement in non-closure and closure of peritoneum during open appendectomy. Study Design: Randomized controlled trial. Place and Duration of Study: Department of General Surgery Combined Military Hospital Quetta, from 1st August 2014 to 30th April 2015. Material and Methods: A total of 60 patients were included in this study and were divided into two groups of 30 each. Patients in group A underwent open appendectomy with closure of peritoneum while patients in group B had non-closure of peritoneum during the same procedure. Post-operatively, pain severity was assessed on visual analogue scale (VAS) numeric pain distress scale. On presence of VAS numeric pain distress scale between 5 to 7, intramuscular (IM) diclofenac sodium was given and on score >7, intravascular (IV) tramadol was given. The final outcome was measured at day 0 and day 1. Results: Pain score and analgesic requirements were significantly less in non-closure group than closure group on day 0 and day 1, showing statistically significant difference between the two groups. Conclusion: Mean post-operative analgesic requirement is significantly less in non-closure group as compared to closure group during open appendectomy. (author)

  18. Closure Report for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Mark Burmeister

    2007-01-01

    This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met as specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs)

  19. Scalp Wound Closure with K wires: An alternative easier method to scalp wound closure.

    Science.gov (United States)

    Ramesh, S; Ajik, S

    2012-12-01

    Scalp defects and lacerations present a reconstructive challenge to plastic surgeons. Many methods have been described from the use of skin grafting to rotation flaps. Here we present a method of closure of a contaminated scalp wound with the use of Kirschner wires. In our case, closure of scalp laceration was made possible with the use of 1.4 Kirschner wires and cable tie/ zip tie fasteners. The duration to closure of wound was 10 days. In reconstructing the scalp defect, this method was found to adhere to principles of scalp reconstruction. There were no post operative complications found from the procedure. On initial application on the edge of the wound, tension applied caused the K wires to cut through the wound edge. On replacement of K wires 1cm away from wound edge the procedure was not plagued by any further complication. In conclusion we find scalp closure with Kirschner wires are a simple and effective method for scalp wound closure.

  20. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 426: Cactus Spring Waste Trenches (TTR); (5) CAU 453: Area 9 UXO Landfill (TTR); (6) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR); and (7) CAU 487: Thunderwell Site (TTR). The annual post-closure inspections were conducted May 5-6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections

  1. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-05-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR) The annual post-closure inspections were conducted May 5–6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections required. Vegetation

  2. Risk and Performance Analyses Supporting Closure of WMA C at the Hanford Site in Southeast Washington

    International Nuclear Information System (INIS)

    Eberlein, Susan J.; Bergeron, Marcel P.; Kemp, Christopher J.; Hildebrand, R. Douglas; Aly, Alaa; Kozak, Matthew; Mehta, Sunil; Connelly, Michael

    2013-01-01

    The Office of River Protection under the U.S. Department of Energy (DOE) is pursuing closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C as stipulated by the Hanford Federal Facility Agreement and Consent Order (HFFACO) under federal requirements and work tasks will be done under the State-approved closure plans and permits. An initial step in meeting the regulatory requirements is to develop a baseline risk assessment representing current conditions based on available characterization data and information collected at the WMA C location. The baseline risk assessment will be supporting a Resource Conservation and Recovery Act of 1976 (RCRA) Field Investigation (RFI)/Corrective Measures Study (CMS) for WMA closure and RCRA corrective action. Complying with the HFFACO conditions also involves developing a long-term closure Performance Assessment (PA) that evaluates human health and environmental impacts resulting from radionuclide inventories in residual wastes remaining in WMA C tanks and ancillary equipment. This PA is being developed to meet the requirements necessary for closure authorization under DOE Order 435.1 and Washington State Hazardous Waste Management Act. To meet the HFFACO conditions, the long-term closure risk analysis will include an evaluation of human health and environmental impacts from hazardous chemical inventories along with other performance Comprehensive Environmental Response, Compensation, and Liability Act Appropriate and Applicable Requirements (CERCLA ARARs) in residual wastes left in WMA C facilities after retrieval and removal. This closure risk analysis is needed to needed to comply with the requirements for permitted closure. Progress to date in developing a baseline risk assessment of WMA C has involved aspects of an evaluation of soil characterization and groundwater monitoring data collected as a part of the RFI/CMS and RCRA monitoring. Developing the long-term performance assessment aspects has involved the

  3. Risk and Performance Analyses Supporting Closure of WMA C at the Hanford Site in Southeast Washington

    Energy Technology Data Exchange (ETDEWEB)

    Eberlein, Susan J.; Bergeron, Marcel P.; Kemp, Christopher J.

    2013-11-11

    The Office of River Protection under the U.S. Department of Energy (DOE) is pursuing closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C as stipulated by the Hanford Federal Facility Agreement and Consent Order (HFFACO) under federal requirements and work tasks will be done under the State-approved closure plans and permits. An initial step in meeting the regulatory requirements is to develop a baseline risk assessment representing current conditions based on available characterization data and information collected at the WMA C location. The baseline risk assessment will be supporting a Resource Conservation and Recovery Act of 1976 (RCRA) Field Investigation (RFI)/Corrective Measures Study (CMS) for WMA closure and RCRA corrective action. Complying with the HFFACO conditions also involves developing a long-term closure Performance Assessment (PA) that evaluates human health and environmental impacts resulting from radionuclide inventories in residual wastes remaining in WMA C tanks and ancillary equipment. This PA is being developed to meet the requirements necessary for closure authorization under DOE Order 435.1 and Washington State Hazardous Waste Management Act. To meet the HFFACO conditions, the long-term closure risk analysis will include an evaluation of human health and environmental impacts from hazardous chemical inventories along with other performance Comprehensive Environmental Response, Compensation, and Liability Act Appropriate and Applicable Requirements (CERCLA ARARs) in residual wastes left in WMA C facilities after retrieval and removal. This closure risk analysis is needed to needed to comply with the requirements for permitted closure. Progress to date in developing a baseline risk assessment of WMA C has involved aspects of an evaluation of soil characterization and groundwater monitoring data collected as a part of the RFI/CMS and RCRA monitoring. Developing the long-term performance assessment aspects has involved the

  4. Drugs Approved for Thyroid Cancer

    Science.gov (United States)

    ... Ask about Your Treatment Research Drugs Approved for Thyroid Cancer This page lists cancer drugs approved by the ... that are not listed here. Drugs Approved for Thyroid Cancer Cabozantinib-S-Malate Caprelsa (Vandetanib) Cometriq (Cabozantinib-S-Malate) Doxorubicin ...

  5. Drugs Approved for Breast Cancer

    Science.gov (United States)

    ... Ask about Your Treatment Research Drugs Approved for Breast Cancer This page lists cancer drugs approved by the ... are not listed here. Drugs Approved to Prevent Breast Cancer Evista (Raloxifene Hydrochloride) Raloxifene Hydrochloride Tamoxifen Citrate Drugs ...

  6. Angle closure glaucoma in congenital ectropion uvea

    Directory of Open Access Journals (Sweden)

    Grace M. Wang

    2018-06-01

    Full Text Available Purpose: Congenital ectropion uvea is a rare anomaly, which is associated with open, but dysplastic iridocorneal angles that cause childhood glaucoma. Herein, we present 3 cases of angle-closure glaucoma in children with congenital ectropion uvea. Observations: Three children were initially diagnosed with unilateral glaucoma secondary to congenital ectropion uvea at 7, 8 and 13 years of age. The three cases showed 360° of ectropion uvea and iris stromal atrophy in the affected eye. In one case, we have photographic documentation of progression to complete angle closure, which necessitated placement of a glaucoma drainage device 3 years after combined trabeculotomy and trabeculectomy. The 2 other cases, which presented as complete angle closure, also underwent glaucoma drainage device implantation. All three cases had early glaucoma drainage device encapsulation (within 4 months and required additional surgery (cycloablation or trabeculectomy. Conclusions and importance: Congenital ectropion uvea can be associated with angle-closure glaucoma, and placement of glaucoma drainage devices in all 3 of our cases showed early failure due to plate encapsulation. Glaucoma in congenital ectropion uvea requires attention to angle configuration and often requires multiple surgeries to obtain intraocular pressure control. Keywords: Congenital ectropion uvea, Juvenile glaucoma, Angle-closure glaucoma, Glaucoma drainage device

  7. Closure of shallow underground injection wells

    International Nuclear Information System (INIS)

    Veil, J.A.; Grunewald, B.

    1993-01-01

    Shallow injection wells have long been used for disposing liquid wastes. Some of these wells have received hazardous or radioactive wastes. According to US Environmental Protection Agency (EPA) regulations, Class IV wells are those injection wells through which hazardous or radioactive wastes are injected into or above an underground source of drinking water (USDW). These wells must be closed. Generally Class V wells are injection wells through which fluids that do not contain hazardous or radioactive wastes are injected into or above a USDW. Class V wells that are responsible for violations of drinking water regulations or that pose a threat to human health must also be closed. Although EPA regulations require closure of certain types of shallow injection wells, they do not provide specific details on the closure process. This paper describes the regulatory background, DOE requirements, and the steps in a shallow injection well closure process: Identification of wells needing closure; monitoring and disposal of accumulated substances; filling and sealing of wells; and remediation. In addition, the paper describes a major national EPA shallow injection well enforcement initiative, including closure plan guidance for wells used to dispose of wastes from service station operations

  8. Strategic Planning for Hot Cell Closure

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2001-01-01

    The United States Department of Energy (DOE) and its contractor were remediating a large hot cell complex to mitigate the radiological hazard. A Resource Conservation and Recovery Act (RCRA) closure unit was determined to be located within the complex. The regulator established a challenge to develop an acceptable closure plan on a short schedule (four months). The scope of the plan was to remove all excess equipment and mixed waste from the closure unit, establish the requirements of the legally binding Closure Plan and develop an acceptable schedule. The complex has several highly radioactive tanks, tank vaults, piping, and large hot cells containing complex chemical processing equipment. Driven by a strong need to develop an effective strategy to meet cleanup commitments, three principles were followed to develop an acceptable plan: (1) Use a team approach, (2) Establish a buffer zone to support closure, and (3) Use good practice when planning the work sequence. The team was composed of DOE, contractor, and Washington State Department of Ecology (Regulator) staff. The team approach utilized member expertise and fostered member involvement and communication. The buffer zone established an area between the unregulated parts of the building and the areas that were allegedly not in compliance with environmental standards. Introduction of the buffer zone provided simplicity, clarity, and flexibility into the process. Using good practice means using the DOE Integrated Safety Management Core Functions for planning and implementing work safely. Paying adequate attention to detail when the situation required contributed to the process credibility and a successful plan

  9. Closure Report for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5 Tonopah Test Range, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    D. H. Cox

    2001-01-01

    The following site closure activities were performed at the CAU 428 site located at the TTR and are documented in this report: Preplanning and site preparation; Excavating and removing impacted soil; Removing septic tank contents; Closing septic tanks by filling them with clean soil; Collecting verification samples to verify that COCs have been removed to approved levels; Backfilling the excavations to surface grade with clean soil; Disposal of excavated materials following applicable federal, state, and DOE/NV regulations in accordance with Section 2.3 of the CAP (DOE/NV, 2000); and Decontamination of equipment as necessary. Closure was accomplished following the approved CAP (DOE/NV, 2000). Verification sample data demonstrate that all COCs were removed to the remediation standards. Therefore, the site is clean-closed

  10. Closure Report for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Gustafason, D.L.

    2001-01-01

    The Area 25 Vehicle Washdown, Corrective Action Unit (CAU) 240, was clean-closed following the approved Corrective Action Decision Document closure alternative and in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996). The CAU consists of thee Corrective Action Sites (CASs): 25-07-01 - Vehicle Washdown Area (Propellant Pad); 25-07-02 - Vehicle Washdown Area (F and J Roads Pad); and 25-07-03 - Vehicle Washdown Station (RADSAFE Pad). Characterization activities indicated that only CAS 25-07-02 (F and J Roads Pad) contained constituents of concern (COCs) above action levels and required remediation. The COCs detected were Total Petroleum Hydrocarbons (TPH) as diesel, cesium-137, and strontium-90. The F and J Roads Pad may have been used for the decontamination of vehicles and possibly disassembled engine and reactor parts from Test Cell C. Activities occurred there during the 1960s through early 1970s. The F and J Roads Pad consisted of a 9- by 5-meter (m) (30- by 15-foot [ft]) concrete pad and a 14- by 13-m (46-by 43-ft) gravel sump. The clean-closure corrective action consisted of excavation, disposal, verification sampling, backfilling, and regrading. Closure activities began on August 21, 2000, and ended on September 19, 2000. Waste disposal activities were completed on December 12, 2000. A total of 172 cubic meters (223 cubic yards) of impacted soil was excavated and disposed. The concrete pad was also removed and disposed. Verification samples were collected from the bottom and sidewalls of the excavation and analyzed for TPH diesel and 20-minute gamma spectroscopy. The sample results indicated that all impacted soil above remediation standards was removed. The closure was completed following the approved Corrective Action Plan. All impacted waste was disposed in the Area 6 Hydrocarbon Landfill. All non-impacted debris was disposed in the Area 9 Construction Landfill and the Area 23 Sanitary Landfill

  11. Detection of primary angle closure using anterior segment optical coherence tomography in Asian eyes.

    Science.gov (United States)

    Nolan, Winifred P; See, Jovina L; Chew, Paul T K; Friedman, David S; Smith, Scott D; Radhakrishnan, Sunita; Zheng, Ce; Foster, Paul J; Aung, Tin

    2007-01-01

    To evaluate noncontact anterior segment optical coherence technology (AS-OCT) as a qualitative method of imaging the anterior chamber angle and to determine its ability to detect primary angle closure when compared with gonioscopy in Asian subjects. Prospective observational case series. Two hundred three subjects were recruited from glaucoma clinics in Singapore with diagnoses of primary angle closure, primary open-angle glaucoma, ocular hypertension, or cataract. Both eyes (if eligible) of each patient were included in the study. Exclusion criteria were pseudophakia or previous glaucoma surgery. Images of the nasal, temporal, and inferior angles were obtained with AS-OCT in dark and then light conditions. Gonioscopic angle width was graded using the Spaeth classification for each quadrant in low lighting conditions. Angle closure was defined by AS-OCT as contact between the peripheral iris and angle wall anterior to the scleral spur and by gonioscopy as a Spaeth grade of 0 degree (posterior trabecular meshwork not visible). Comparison of the 2 methods in detecting angle closure was done by eye and by individual. Sensitivities and specificities of AS-OCT were calculated using gonioscopy as the reference standard. Complete data were available for 342 eyes of 200 patients. Of the patients, 70.9% had a clinical diagnosis of treated or untreated primary angle closure. Angle closure in > or =1 quadrants was detected by AS-OCT in 142 (71%) patients (228 [66.7%] eyes) and by gonioscopy in 99 (49.5%) patients (152 [44.4%] eyes). The inferior angle was closed more frequently than the nasal or temporal quadrants using both AS-OCT and gonioscopy. When performed under dark conditions, AS-OCT identified 98% of those subjects found to have angle closure on gonioscopy (95% confidence interval [CI], 92.2-99.6) and led to the characterization of 44.6% of those found to have open angles on gonioscopy to have angle closure as well. With gonioscopy as the reference standard

  12. Multidisciplinary Assessment in Optimising Results of Percutaneous Patent Foramen Ovale Closure.

    Science.gov (United States)

    Davies, Allan; Ekmejian, Avedis; Collins, Nicholas; Bhagwandeen, Rohan

    2017-03-01

    Percutaneous patent foramen ovale (PFO) closure is a therapeutic option to prevent recurrent cerebral ischaemia in patients with cryptogenic stroke and transient cerebral ischaemia (TIA). The apparent lack of benefit seen in previous randomised trials has, in part, reflected inclusion of patients with alternate mechanisms of stroke. The role of formal neurology involvement in accurately delineating the likely aetiology of stroke or TIA is crucial in appropriate identification of patients for device closure. Furthermore, as the benefits of device closure may accrue over time, long-term follow-up is essential to define the role of device closure in management of presumed cryptogenic stroke. We retrospectively reviewed our experience with percutaneous PFO device closure since 2005. All subjects who underwent PFO closure at John Hunter and Lake Macquarie Private Hospitals were included in the study. All patients referred for device closure following cryptogenic stroke or TIA had first undergone formal neurology review with appropriate imaging and exclusion of paroxysmal atrial arrhythmia. Patients with a history of transient ischaemic attack (TIA) are frequently referred to a specialised clinic, aimed to identify patients with conditions not referable to cerebral ischaemia, with investigations initiated by the specialist clinic to elucidate an underlying aetiology. Outcome data was derived from the Hunter New England Area Local Health District Cardiac and Stroke Outcomes Unit, in addition to review of the medical record. The Cardiac and Stroke Outcomes Unit prospectively identified all patients presenting with stroke, TIA and atrial fibrillation. One hundred and twelve consecutive patients undergoing percutaneous patent foramen ovale closure between 2005 and 2015 were identified. The average age was 42.7 years and 57 (50.9%) patients were male. Cryptogenic stroke (68.8%) and transient cerebral ischaemia (23.2%) were the most common indications for PFO closure, with the

  13. Closure of a unique mixed waste storage canal at the Dept. of Energy's Oak Ridge National Laboratory (ORNL)

    International Nuclear Information System (INIS)

    Greer, J.K. Jr.; Etheridge, J.T.; Thompson, W.T.

    1994-01-01

    At the Department of Energy's (DOE's) Oak Ridge National Laboratory (ORNL) a unique closure was accomplished for a storage canal that contained both hazardous chemical contaminants controlled by the Resource Conservation and Recovery Act (RCRA), and radioactive contaminants controlled by the Atomic Energy Act (AEA). During 1991 and 1992, after approvals were received from the DOE and the Tennessee Department of Environment and Conservation (TDEC), subcontractors to DOE's Construction Manager were mobilized and remote controlled equipment was operated on site to remove the RCRA and radioactive contamination (referred to hereafter as mixed wastes) from the 3001 Storage Canal at ORNL. After numerous open-quotes surprisesclose quotes during the removal activities, each requiring problem resolution and approvals from DOE and TDEC, the canal closure was completed in September 1992 and final closure certification was submitted to TDEC in October 1992. The following discussion describes the learning experiences that ORNL and DOE acquired from a RCRA closure project for a mixed waste storage canal containing high radiation levels. The project was successful, especially since worker exposures were minimized, but was lengthy, requiring 30 months from notification of a leak in the canal until final demobilization of the subcontractor, and expensive to complete (total overall cost of $3 million)

  14. 78 FR 38095 - Request for Comments of a Previously Approved Information Collection

    Science.gov (United States)

    2013-06-25

    ... vehicle dealers, repair business. Abstract: If a private individual or lessee wants to install an air bag... completed forms to NHTSA within seven days. The submission of the completed forms by the dealers and repair.... The completed forms will enable the agency to determine whether the dealers and repair business are...

  15. 78 FR 71712 - Request for Comments of a Previously Approved Information Collection

    Science.gov (United States)

    2013-11-29

    ... during the operations by the Armed forces of the United States in World War II, Korea, Vietnam, and... of information on respondents, including the use of automated collection techniques or other forms of information technology. Authority: The Paperwork Reduction Act of 1995; 44 U.S.C. Chapter 35, as amended; and...

  16. 76 FR 57795 - Agency Request for Renewal of a Previously Approved Collection; Disclosure of Code Sharing...

    Science.gov (United States)

    2011-09-16

    ... significant economic benefits. Although codesharing and wet-lease arrangements can offer significant consumer benefits, they can also be misleading unless consumers know that the transportation they are considering... price and service options for consumers or enable the use of equipment sized appropriately for the...

  17. 77 FR 11187 - Request for Comments of a Previously Approved Information Collection

    Science.gov (United States)

    2012-02-24

    ... codesharing, as well as long-term wet leases, can offer significant economic benefits. Although codesharing and wet-lease arrangements can offer significant consumer benefits, they can also be misleading unless... markets, this efficiency can lead to increased price and service options for consumers or enable the use...

  18. 75 FR 72840 - Agency Information Collection Activities: Reinstatement, With Change of a Previously Approved...

    Science.gov (United States)

    2010-11-26

    ... 2009 will focus on the organizational structure of state courts throughout the country. Emphasis will... electronic submission of responses. Overview of This Information (1) Type of information collection...

  19. 75 FR 59293 - Agency Information Collection Activities: Reinstatement, With Change, of a Previously Approved...

    Science.gov (United States)

    2010-09-27

    ... 2009 will focus on the organizational structure of state courts throughout the country. Emphasis will... submission of responses. Overview of This Information (1) Type of information collection: Reinstatement, with...

  20. 77 FR 32169 - Agency Requests for Renewal of a Previously Approved Information Collection: Small Business...

    Science.gov (United States)

    2012-05-31

    ... businesses and those certified under CFR 49 parts 23 and or 26 as Disadvantaged Business Enterprises (DBE... Disadvantaged Business Enterprise (DBE), Women-Owned Small Business (WOB), Small Disadvantaged Business (SDB), 8... Field Offices include business analysis, general management and technical assistance and training...

  1. 78 FR 59335 - Notice of Request for Extension of a Previously Approved Information Collection (Industry...

    Science.gov (United States)

    2013-09-26

    ... Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, gender, religion, age, disability, political beliefs, sexual orientation, and marital or... discrimination, write USDA, Office of the Assistant Secretary for Civil Rights, 1400 Independence Avenue SW...

  2. 77 FR 55898 - Request for Comments on a Renewal of a Previously Approved Information Collection: Automotive...

    Science.gov (United States)

    2012-09-11

    ...: Kenneth R. Katz, Fuel Economy Division, Office of International Policy, Fuel Economy and Consumer Programs... Fuel Economy Reports ACTION: Notice and request for comments. SUMMARY: In compliance with the Paperwork... Part 537, Automotive Fuel Economy Reports. OMB Control Number: 2127-0019. Type of Request: Renewal of a...

  3. 77 FR 32170 - Notice of Request for Renewal of Previously Approved Collection; Short Term Lending Program...

    Science.gov (United States)

    2012-05-31

    ..., Manager Financial Assistance Division, Office of Small and Disadvantaged Business Utilization, Office of... (8a, women-owned, small disadvantaged, HUBZone, veteran owned, and service disabled veteran [[Page... Businesses (8a, women-owned, small disadvantaged, HUBZone, veteran owned, and service disabled veteran owned...

  4. 78 FR 69456 - Notice To Reinstate a Previously Approved Information Collection; Comment Request

    Science.gov (United States)

    2013-11-19

    ... pilot accrued the flight time, airplane single- and multi-engine, night, instrument, rotorcraft, glider... NTSB accepts paper copies of Form 6120.1 sent via postal mail or facsimile, as well as electronic...

  5. 77 FR 69924 - Request for Comments on a Renewal of a Previously Approved Information Collection: Production...

    Science.gov (United States)

    2012-11-21

    ... manufacturers' estimates of the future vehicle population, and fuel economy improvements and incremental costs...: Kenneth R. Katz, Fuel Economy Division, Office of International Policy, Fuel Economy and Consumer Programs... Parts 531 and 533 Passenger Car Average Fuel Economy Standards--Model Years 2016-2025; Light Truck...

  6. 76 FR 31675 - Agency Information Collection Activities: Notice of Request for Renewal of a Previously Approved...

    Science.gov (United States)

    2011-06-01

    ... Program. Inspections of fracture critical bridges and underwater inspections are also required at... basis for setting initial priorities for the replacement or rehabilitation of bridges under the Highway... rehabilitation. In order to apportion funds for the HBP, the law requires that a cost to replace or rehabilitate...

  7. 78 FR 57351 - A Reinstatement of a Previously Approved Information Collection

    Science.gov (United States)

    2013-09-18

    ..., Extension, and Teaching Policy Act of 1977, as amended (7 U.S.C. 3101 et seq.); the Smith-Lever Act (7 U.S.C... research information. This mission supports one of NIFA's primary functions, as stated in the agency... users keep abreast of the latest developments in agriculture, food science, human nutrition, and...

  8. 78 FR 77202 - Request for Comments of a Previously Approved Information Collection

    Science.gov (United States)

    2013-12-20

    ... below is being forwarded to the Office of Management and Budget (OMB) for review and comments. A Federal... FURTHER INFORMATION CONTACT: Lauren Brand, Director, Office of Marine Highways and Passenger Services, MAR... 20590. Telephone: 202-366-7057; or email lauren.brand@dot.gov . Copies of this collection also can be...

  9. 76 FR 4862 - Notice of Intent To Reinstate a Previously Approved Information Collection

    Science.gov (United States)

    2011-01-27

    ... countries. Marketing of the increasing volume of distillers by-products to more livestock producers would... quantities of distillers grains, product qualities, volume of sales, pricing, storage facilities, marketing channels, plant services, transportation requirements, species fed, and feed ratios. In its summary report...

  10. 77 FR 65586 - Agency Information Collection Activities; Emergency Reinstatement of Previously Approved Collection

    Science.gov (United States)

    2012-10-29

    ... misleading character (the right to a hearing is conditional on a finding of jurisdiction). The appellant's... information about non-retirement actions in this part and then subsequently cites to affirmative defenses to... addressing your retirement rights or benefits. Certain actions that might not otherwise be appealable to the...

  11. 78 FR 64262 - Agency Information Collection Activities: Request for Comments of a Previously Approved...

    Science.gov (United States)

    2013-10-28

    ... represented a collection site that performs DOT urine collections and pre-employment medical exams. Our... Workplace Drug and Alcohol Testing Programs. This request for a renewal of the information collection for... workplace. The MIS form includes employer specific drug and alcohol testing information such as the reason...

  12. 77 FR 4862 - Agency Requests for Renewal of a Previously Approved Information Collection: SBTRC Regional Field...

    Science.gov (United States)

    2012-01-31

    ..., marketing, meetings/ conferences, and services to businesses as completed during the quarter. The Quarterly... include business analysis, general management & technical assistance and training, business counseling...) AGENCY: Office of Small and Disadvantaged Business Utilization (OSDBU), Office of the Secretary of...

  13. 75 FR 22174 - Petition To Modify an Exemption of a Previously Approved Antitheft Device; Porsche

    Science.gov (United States)

    2010-04-27

    ... unit, optional keyless entry system and electronic parking brake. Porsche stated that the central... functioning of the engine management system, an activated parking brake system, central locking and an alarm... Administration (NHTSA) granted in full Porsche Cars North America's (Porsche) petition for an exemption in...

  14. 77 FR 14459 - Notice of Request for Renewal of a Previously Approved Collection

    Science.gov (United States)

    2012-03-09

    ... guarantee applicants. The revised STLP application is a single, consolidated document that is easier to read... other certified Small Businesses (8a, women-owned, small disadvantaged, HUBZone, veteran owned, and service disabled veteran owned) the opportunity to obtain short term working capital at variable interest...

  15. 76 FR 69321 - Petition to Modify an Exemption of a Previously Approved Antitheft Device; Porsche

    Science.gov (United States)

    2011-11-08

    ... diagnostic capabilities to accept inputs such as motion sensors and an alarm control unit that monitored the... interference tests, vibration tests and endurance tests. Porsche stated that its antitheft device also features a built- in self-diagnostic that constantly checks for system failures. If a failure is detected...

  16. 76 FR 23538 - Notice of Intent To Reinstate a Previously Approved Information Collection.

    Science.gov (United States)

    2011-04-27

    ... target, sampling design, and/ or questionnaire length. DATES: Comments on this notice must be received by... questionnaire is modeled after the 2003-2006 CEAP surveys and will be administered through personal interviews...

  17. 78 FR 9035 - Renewal and Revision of a Previously Approved Information Collection; Comment Request; State...

    Science.gov (United States)

    2013-02-07

    ..., via Application Programming Interfaces (APIs) and in various file formats. Numerous public and private... connections, incumbent and competitive local exchange carriers, facilities-based mobile telephony service...

  18. In-Situ Testing and Performance Assessment of a Redesigned WIPP Panel Closure - 13192

    Energy Technology Data Exchange (ETDEWEB)

    Klein, Thomas [URS-Professional Solutions, 4021 National Parks Highway Carlsbad, NM 88220 (United States); Patterson, Russell [Department of Energy-Carlsbad Field Office, 4021 National Parks Highway Carlsbad, NM 88220 (United States); Camphouse, Chris; Herrick, Courtney; Kirchner, Thomas; Malama, Bwalya; Zeitler, Todd [Sandia National Laboratories-Carlsbad, 4100 National Parks Highway Carlsbad, NM 88220 (United States); Kicker, Dwayne [SM Stoller Corporation-Carlsbad, 4100 National Parks Highway Carlsbad, NM (United States)

    2013-07-01

    There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotated Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling

  19. A new technique for the closure of the lens capsule by laser welding.

    Science.gov (United States)

    Pini, Roberto; Rossi, Francesca; Menabuoni, Luca; Lenzetti, Ivo; Yoo, Sonia; Parel, Jean-Marie

    2008-01-01

    A new method is presented for the closure of the lens capsule based on laser welding of suitably prepared patches of anterior capsular tissue. Experiments were performed in freshly enucleated porcine eyes. The patches were previously stained with a solution of indocyanine green in sterile water and then welded on the recipient capsule by means of diode laser radiation at 810 nm. The welded tissue revealed mechanical properties comparable to those of healthy tissue. This technique is proposed to repair capsular breaks and to provide the closure of the capsulorhexis in lens refilling procedures.

  20. Biological constraints do not entail cognitive closure.

    Science.gov (United States)

    Vlerick, Michael

    2014-12-01

    From the premise that our biology imposes cognitive constraints on our epistemic activities, a series of prominent authors--most notably Fodor, Chomsky and McGinn--have argued that we are cognitively closed to certain aspects and properties of the world. Cognitive constraints, they argue, entail cognitive closure. I argue that this is not the case. More precisely, I detect two unwarranted conflations at the core of arguments deriving closure from constraints. The first is a conflation of what I will refer to as 'representation' and 'object of representation'. The second confuses the cognitive scope of the assisted mind for that of the unassisted mind. Cognitive closure, I conclude, cannot be established from pointing out the (uncontroversial) existence of cognitive constraints. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. Hanford Patrol Academy demolition sites closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

  2. Development of an arid site closure plan

    International Nuclear Information System (INIS)

    Nyhan, J.W.; Barnes, F.J.

    1987-01-01

    This document describes the development of a prototype plan for the effective closure and stabilization of an arid low-level waste disposal site. This plan will provide demonstrated closure techniques for a trench in a disposal site at Los Alamos. The accuracy of modeling soil water storage by two hydrologic models, CREAMS and HELP, was tested by comparing simulation results with field measurements of soil moisture in eight experimental landfill cover systems having a range of well-defined soil profiles and vegetative covers. Regression analysis showed that CREAMS generally represented soil moisture more accurately than HELP simulations. Precautions for determining parameter values for model input and for interpreting simulation results are discussed. A specific example is presented showing how the field-validated hydrologic models can be used to develop a final prototype closure plan. 15 refs., 13 figs., 3 tabs

  3. Primary closure of equine laryngotomy incisions

    DEFF Research Database (Denmark)

    Lindegaard, C.; Karlsson, L.; Ekstrøm, Claus Thorn

    2016-01-01

    incision between January 1995 and June 2012 were reviewed. Horses with a laryngotomy incision closed in three layers for primary healing were included. Descriptive data on healing characteristics and complications of laryngotomy wounds were collected from the medical records and via follow......The objective was to report healing characteristics and complications after primary closure of equine laryngotomies and analyse factors potentially associated with complications. This retrospective case series of the medical records of horses (n = 180) undergoing laryngoplasty and laryngotomy...... after primary closure of equine laryngotomy incisions are infrequent and considered of minimal severity and can be performed safely when paying careful attention to the closure of the cricothyroid membrane....

  4. Poet Marion Approval

    Science.gov (United States)

    This update August 9, 2016 letter from EPA approves, with modifications, the petition from Poet Biorefining-North Manchester, LLC, regarding non-grandfathered ethanol produced through a dry mill process, qualifying under the Clean Air Act for renewable

  5. Poet Portland Approval

    Science.gov (United States)

    This update August 9, 2016 letter from EPA approves the petition, with modifications, from Poet Biorefining-Portland, LLC, regarding non-grandfathered ethanol produced through a dry mill process, qualifying under the Clean Air Act for renewable fuel

  6. Poet North Manchester Approval

    Science.gov (United States)

    This update August 9, 2016 letter from EPA approves, with modifications, the petition from Poet Biorefining-North Manchester, LLC, regarding non-grandfathered ethanol produced through a dry mill process, qualifying under the Clean Air Act for renewable

  7. Poet Alexandria Approval

    Science.gov (United States)

    This update August 9, 2016 letter from EPA approves, with modifications, the petition from Poet Biorefining-Alexandria, LLC, regarding non-grandfathered ethanol produced through a dry mill process, qualifying under the Clean Air Act for renewable fuel

  8. Poet Laddonia Approval

    Science.gov (United States)

    This update Auugust 9, 2016 letter from EPA approves with modifications, the petition from Poet Biorefining Laddonia, Poet Laddonia Facility, regarding non-grandfathered ethanol produced through a dry mill process, qualifying under the Clean Air Act f

  9. Drugs Approved for Neuroblastoma

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for neuroblastoma. The list includes generic names and brand names. The drug names link to NCI's Cancer Drug Information summaries.

  10. Drugs Approved for Leukemia

    Science.gov (United States)

    This page lists cancer drugs approved by the FDA for use in leukemia. The drug names link to NCI's Cancer Drug Information summaries. The list includes generic names, brand names, and common drug combinations, which are shown in capital letters.

  11. Drugs Approved for Retinoblastoma

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for retinoblastoma. The list includes generic names and brand names. The drug names link to NCI’s Cancer Drug Information summaries.

  12. Premarket Approvals (PMA)

    Data.gov (United States)

    U.S. Department of Health & Human Services — Premarket approval by FDA is the required process of scientific review to ensure the safety and effectiveness of all devices classified as Class III devices. An...

  13. Transcatheter closure, mini-invasive closure and open-heart surgical repair for treatment of perimembranous ventricular septal defects in children: a protocol for a network meta-analysis.

    Science.gov (United States)

    You, Tao; Yi, Kang; Ding, Zhao-Hong; Hou, Xiao-Dong; Liu, Xing-Guang; Wang, Xin-Kuan; Ge, Long; Tian, Jin-Hui

    2017-06-21

    Both transcatheter device closure and surgical repair are effective treatments with excellent midterm outcomes for perimembranous ventricular septal defects (pmVSDs) in children. The mini-invasive periventricular device occlusion technique has become prevalent in research and application, but evidence is limited for the assessment of transcatheter closure, mini-invasive closure and open-heart surgical repair. This study comprehensively compares the efficacy, safety and costs of transcatheter closure, mini-invasive closure and open-heart surgical repair for treatment of pmVSDs in children using Bayesian network meta-analysis. A systematic search will be performed using Chinese Biomedical Literature Database, China National Knowledge Infrastructure, PubMed, EMBASE.com and the Cochrane Central Register of Controlled Trials to include random controlled trials, prospective or retrospective cohort studies comparing the efficacy, safety and costs of transcatheter closure, mini-invasive closure and open-heart surgical repair. The risk of bias for the included prospective or retrospective cohort studies will be evaluated according to the risk of bias in non-randomised studies of interventions (ROBINS-I). For random controlled trials, we will use risk of bias tool from Cochrane Handbook version 5.1.0. A Bayesian network meta-analysis will be conducted using R-3.3.2 software. Ethical approval and patient consent are not required since this study is a network meta-analysis based on published trials. The results of this network meta-analysis will be submitted to a peer-reviewed journal for publication. CRD42016053352. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  14. Reactor vessel closure head replacements in 1997

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Framatome-Jeumont Industrie consortium have completed in 1997 28 reactor vessel (RV) closure head replacements, including five on 1300 MWe class PWR units. Framatome manages the operations and handles removal and reinstallation of equipment (not including the control rod drive mechanisms (CRDM)) and the requalification tests, while JI, which manufactures the CRDMs, is involved in the CRDM cutting, re-machining and welding operations, using tools of original design, in order to optimize the RV closure head operation in terms of costs, schedule and dosage

  15. Closure properties of Watson-Crick grammars

    Science.gov (United States)

    Zulkufli, Nurul Liyana binti Mohamad; Turaev, Sherzod; Tamrin, Mohd Izzuddin Mohd; Azeddine, Messikh

    2015-12-01

    In this paper, we define Watson-Crick context-free grammars, as an extension of Watson-Crick regular grammars and Watson-Crick linear grammars with context-free grammar rules. We show the relation of Watson-Crick (regular and linear) grammars to the sticker systems, and study some of the important closure properties of the Watson-Crick grammars. We establish that the Watson-Crick regular grammars are closed under almost all of the main closure operations, while the differences between other Watson-Crick grammars with their corresponding Chomsky grammars depend on the computational power of the Watson-Crick grammars which still need to be studied.

  16. Straight line closure of congenital macrostomia

    Directory of Open Access Journals (Sweden)

    Schwarz Richard

    2004-01-01

    Full Text Available The results of patients operated on by Nepal Cleft Lip and Palate Association (NECLAPA surgeons for congenital macrostomia were prospectively studied between January 2000 and December 2002. There were four males and three females with a median age of 10 years. Three had an associated branchial arch syndrome. In all patients an overlapping repair of orbicularis oris was done. Six patients had a straight line closure with excellent cosmetic results and one a Z-plasty with a more obvious scar. All had a normal appearing commissure. Overlapping orbicularis repair with straight line skin closure for this rare congenital anomaly is recommended.

  17. Environmental considerations in mine closure planning

    International Nuclear Information System (INIS)

    Ricks, G.

    1997-01-01

    Mine closure planning considers the best ways to plan and manage the environmental changes and socio-economic effects associated with the closing of mines. While the criteria for judging successful closures may vary, it is particularly important for physical, chemical and biological stability to be achieved and for final land use to be appropriate. Trust funds are increasingly favoured as a practical means of fulfilling the requirement for a financial surety and of ensuring that financial provision is available at the end of the mine's life. (author)

  18. Uncertainty Quantification of Multi-Phase Closures

    Energy Technology Data Exchange (ETDEWEB)

    Nadiga, Balasubramanya T. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2017-10-27

    In the ensemble-averaged dispersed phase formulation used for CFD of multiphase ows in nuclear reactor thermohydraulics, closures of interphase transfer of mass, momentum, and energy constitute, by far, the biggest source of error and uncertainty. Reliable estimators of this source of error and uncertainty are currently non-existent. Here, we report on how modern Validation and Uncertainty Quanti cation (VUQ) techniques can be leveraged to not only quantify such errors and uncertainties, but also to uncover (unintended) interactions between closures of di erent phenomena. As such this approach serves as a valuable aide in the research and development of multiphase closures. The joint modeling of lift, drag, wall lubrication, and turbulent dispersion|forces that lead to tranfer of momentum between the liquid and gas phases|is examined in the frame- work of validation of the adiabatic but turbulent experiments of Liu and Banko , 1993. An extensive calibration study is undertaken with a popular combination of closure relations and the popular k-ϵ turbulence model in a Bayesian framework. When a wide range of super cial liquid and gas velocities and void fractions is considered, it is found that this set of closures can be validated against the experimental data only by allowing large variations in the coe cients associated with the closures. We argue that such an extent of variation is a measure of uncertainty induced by the chosen set of closures. We also nd that while mean uid velocity and void fraction pro les are properly t, uctuating uid velocity may or may not be properly t. This aspect needs to be investigated further. The popular set of closures considered contains ad-hoc components and are undesirable from a predictive modeling point of view. Consequently, we next consider improvements that are being developed by the MIT group under CASL and which remove the ad-hoc elements. We use non-intrusive methodologies for sensitivity analysis and calibration (using

  19. Laser peripheral iridoplasty for angle-closure.

    Science.gov (United States)

    Ng, Wai Siene; Ang, Ghee Soon; Azuara-Blanco, Augusto

    2012-02-15

    Angle-closure glaucoma is a leading cause of irreversible blindness in the world. Treatment is aimed at opening the anterior chamber angle and lowering the IOP with medical and/or surgical treatment (e.g. trabeculectomy, lens extraction). Laser iridotomy works by eliminating pupillary block and widens the anterior chamber angle in the majority of patients. When laser iridotomy fails to open the anterior chamber angle, laser iridoplasty may be recommended as one of the options in current standard treatment for angle-closure. Laser peripheral iridoplasty works by shrinking and pulling the peripheral iris tissue away from the trabecular meshwork. Laser peripheral iridoplasty can be used for crisis of acute angle-closure and also in non-acute situations.   To assess the effectiveness of laser peripheral iridoplasty in the treatment of narrow angles (i.e. primary angle-closure suspect), primary angle-closure (PAC) or primary angle-closure glaucoma (PACG) in non-acute situations when compared with any other intervention. In this review, angle-closure will refer to patients with narrow angles (PACs), PAC and PACG. We searched CENTRAL (which contains the Cochrane Eyes and Vision Group Trials Register) (The Cochrane Library 2011, Issue 12), MEDLINE (January 1950 to January 2012), EMBASE (January 1980 to January 2012), Latin American and Caribbean Literature on Health Sciences (LILACS) (January 1982 to January 2012), the metaRegister of Controlled Trials (mRCT) (www.controlled-trials.com), ClinicalTrials.gov (www.clinicaltrials.gov) and the WHO International Clinical Trials Registry Platform (ICTRP) (www.who.int/ictrp/search/en). There were no date or language restrictions in the electronic searches for trials. The electronic databases were last searched on 5 January 2012. We included only randomised controlled trials (RCTs) in this review. Patients with narrow angles, PAC or PACG were eligible. We excluded studies that included only patients with acute presentations

  20. Special closure for radioactive shipping container

    International Nuclear Information System (INIS)

    Otts, J.V.

    1976-03-01

    The objective of this program was to develop a special lid closure for radioactive material shipping containers, typically steel drums. Three closure techniques were designed, fabricated, and proven to be structurally adequate to protect 1000 lb when dropped 30 ft. The three designs were (1) a 6-in. lid extension (skirt), (2) a 6-in. inner lid, and (3) c-clamps used at the container/lid interface. Based upon structural integrity, economic impact, and minimal design change, the 6-in. lid extension is recommended

  1. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    International Nuclear Information System (INIS)

    2012-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

  2. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2008-01-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activities were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C

  3. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-21

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

  4. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

  5. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-04-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activities were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.

  6. Drosophila heart cell movement to the midline occurs through both cell autonomous migration and dorsal closure.

    Science.gov (United States)

    Haack, Timm; Schneider, Matthias; Schwendele, Bernd; Renault, Andrew D

    2014-12-15

    The Drosophila heart is a linear organ formed by the movement of bilaterally specified progenitor cells to the midline and adherence of contralateral heart cells. This movement occurs through the attachment of heart cells to the overlying ectoderm which is undergoing dorsal closure. Therefore heart cells are thought to move to the midline passively. Through live imaging experiments and analysis of mutants that affect the speed of dorsal closure we show that heart cells in Drosophila are autonomously migratory and part of their movement to the midline is independent of the ectoderm. This means that heart formation in flies is more similar to that in vertebrates than previously thought. We also show that defects in dorsal closure can result in failure of the amnioserosa to properly degenerate, which can physically hinder joining of contralateral heart cells leading to a broken heart phenotype. Copyright © 2014 Elsevier Inc. All rights reserved.

  7. A mapping closure for turbulent scalar mixing using a time-evolving reference field

    Science.gov (United States)

    Girimaji, Sharath S.

    1992-01-01

    A general mapping-closure approach for modeling scalar mixing in homogeneous turbulence is developed. This approach is different from the previous methods in that the reference field also evolves according to the same equations as the physical scalar field. The use of a time-evolving Gaussian reference field results in a model that is similar to the mapping closure model of Pope (1991), which is based on the methodology of Chen et al. (1989). Both models yield identical relationships between the scalar variance and higher-order moments, which are in good agreement with heat conduction simulation data and can be consistent with any type of epsilon(phi) evolution. The present methodology can be extended to any reference field whose behavior is known. The possibility of a beta-pdf reference field is explored. The shortcomings of the mapping closure methods are discussed, and the limit at which the mapping becomes invalid is identified.

  8. Ultrasound evaluation of the cesarean scar: comparison between one- and two layer uterotomy closure

    DEFF Research Database (Denmark)

    Glavind, Julie; Madsen, Lene Duch; Uldbjerg, Niels

    Objectives: To compare the residual myometrial thickness and the size of the cesarean scar defect after one- and two layer uterotomy closure. Methods: From July 2010 a continuous two-layer uterotomy closure technique replaced a continuous one-layer technique after cesarean delivery...... at the Department of Obstetrics and Gynecology at Aarhus University Hospital. A total of 149 consecutively invited women (68 women with one-layer and 81 women with two-layer closure) had their cesarean scar examined with 2D transvaginal sonography (TVS) 6-16 months post partum. Inclusion criteria were non......-pregnant women with one previous elective cesarean, no post-partum uterine infection or uterine re-operation, and no type 1 diabetes. Scar defect width, depth, and residual myometrial thickness were measured on the sagittal plane, and scar defect length was measured on the transverse plane. Results: The median...

  9. Neural tube closure depends on expression of Grainyhead-like 3 in multiple tissues.

    Science.gov (United States)

    De Castro, Sandra C P; Hirst, Caroline S; Savery, Dawn; Rolo, Ana; Lickert, Heiko; Andersen, Bogi; Copp, Andrew J; Greene, Nicholas D E

    2018-03-15

    Failure of neural tube closure leads to neural tube defects (NTDs), common congenital abnormalities in humans. Among the genes whose loss of function causes NTDs in mice, Grainyhead-like3 (Grhl3) is essential for spinal neural tube closure, with null mutants exhibiting fully penetrant spina bifida. During spinal neurulation Grhl3 is initially expressed in the surface (non-neural) ectoderm, subsequently in the neuroepithelial component of the neural folds and at the node-streak border, and finally in the hindgut endoderm. Here, we show that endoderm-specific knockout of Grhl3 causes late-arising spinal NTDs, preceded by increased ventral curvature of the caudal region which was shown previously to suppress closure of the spinal neural folds. This finding supports the hypothesis that diminished Grhl3 expression in the hindgut is the cause of spinal NTDs in the curly tail, carrying a hypomorphic Grhl3 allele. Complete loss of Grhl3 function produces a more severe phenotype in which closure fails earlier in neurulation, before the stage of onset of expression in the hindgut of wild-type embryos. This implicates additional tissues and NTD mechanisms in Grhl3 null embryos. Conditional knockout of Grhl3 in the neural plate and node-streak border has minimal effect on closure, suggesting that abnormal function of surface ectoderm, where Grhl3 transcripts are first detected, is primarily responsible for early failure of spinal neurulation in Grhl3 null embryos. Copyright © 2018 The Authors. Published by Elsevier Inc. All rights reserved.

  10. STATUS OF MECHANICAL SLUDGE REMOVAL AND COOLING COILS CLOSURE AT THE SAVANNAH RIVER SITE - F TANK FARM CLOSURE PORJECT -9225

    International Nuclear Information System (INIS)

    Jolly, R.

    2009-01-01

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal using the Waste on Wheels (WOW) system within two of its storage tanks. The Waste on Wheels (WOW) system is designed to be relatively mobile with the ability for many components to be redeployed to multiple tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2839 cubic meters (750,000 gallons) each. In addition, Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. DOE intends to remove from service and operationally close Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. After obtaining regulatory approval, the tanks and cooling coils will be isolated and filled with grout for long term stabilization. Mechanical Sludge Removal of the remaining sludge waste within Tank 6 removed ∼ 75% of the original 25,000 gallons in August 2007. Utilizing lessons learned from Tank 6, Tank 5 Mechanical Sludge Removal completed removal of ∼ 90% of the original 125 cubic meters (33,000 gallons) of sludge material in May 2008. The successful removal of sludge material meets the requirement of approximately 19 to 28 cubic meters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. The Chemical Cleaning Process will utilize 8 wt% oxalic acid to dissolve the remaining sludge heel. The flow sheet for Chemical Cleaning planned a 20:1 volume ratio of acid to sludge for the first strike with mixing provided by the submersible mixer pumps. The subsequent strikes will utilize a 13:1 volume ratio of acid to sludge with no mixing. The results of the Chemical Cleaning Process are detailed in the 'Status of Chemical

  11. STATUS OF MECHANICAL SLUDGE REMOVAL AND COOLING COILS CLOSURE AT THE SAVANNAH RIVER SITE - F TANK FARM CLOSURE PROJECT - 9225

    Energy Technology Data Exchange (ETDEWEB)

    Jolly, R

    2009-01-06

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal using the Waste on Wheels (WOW) system within two of its storage tanks. The Waste on Wheels (WOW) system is designed to be relatively mobile with the ability for many components to be redeployed to multiple tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2839 cubic meters (750,000 gallons) each. In addition, Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. DOE intends to remove from service and operationally close Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. After obtaining regulatory approval, the tanks and cooling coils will be isolated and filled with grout for long term stabilization. Mechanical Sludge Removal of the remaining sludge waste within Tank 6 removed {approx} 75% of the original 25,000 gallons in August 2007. Utilizing lessons learned from Tank 6, Tank 5 Mechanical Sludge Removal completed removal of {approx} 90% of the original 125 cubic meters (33,000 gallons) of sludge material in May 2008. The successful removal of sludge material meets the requirement of approximately 19 to 28 cubic meters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. The Chemical Cleaning Process will utilize 8 wt% oxalic acid to dissolve the remaining sludge heel. The flow sheet for Chemical Cleaning planned a 20:1 volume ratio of acid to sludge for the first strike with mixing provided by the submersible mixer pumps. The subsequent strikes will utilize a 13:1 volume ratio of acid to sludge with no mixing. The results of the Chemical Cleaning Process are detailed in the &apos

  12. The urethral closure function in continent and stress urinary incontinent women assessed by urethral pressure reflectometry.

    Science.gov (United States)

    Saaby, Marie-Louise

    2014-02-01

    a more detailed description of the efficiency of the closure function and the extent and nature of a possible dysfunction in the individual woman. The urethral closure equation (UCE) and urethral opening pressure at an abdominal pressure of 50 cm H2O (Po-Abd 50), respectively, which combine the permanent and the adjunctive closure forces, could separate continent and SUI women and thus appear to be excellent diagnostic tests. Moreover, the parameters showed highly significant negative correlation with ICIQ-SF, pad test and the number of incontinence episodes per week and are therefore valid as urodynamic severity measures. UPR in SUI women before and after TVT demonstrated a more efficient urethral closure function after the operation. The Po-rest was unchanged suggesting that the sphincteric unit was virtually unaltered and hence the permanent closure forces unchanged. However, the resting opening elastance increased by 18% indicating that at the resting state the TVT somewhat improves the closure function by providing increased resistance against the dilation of the urethra, which probably explains the decreased maximum urine flow rate found after TVT in this and previous studies. The APIR increased in all patients after TVT suggesting that the support system was re-established and thus the adjunctive closure forces improved, regardless of the type of pre-operative dysfunction. The new UPR parameters may be used as outcome measures after treatment.

  13. A clinical study of space closure with nickel-titanium closed coil springs and an elastic module.

    Science.gov (United States)

    Samuels, R H; Rudge, S J; Mair, L H

    1998-07-01

    A previous study has shown that a 150-gram nickel-titanium closed coil spring (Sentalloy, GAC International Inc.) closed spaces more quickly and more consistently than an elastic module (Alastik, Unitec/3M). This study used the same friction sensitive sliding mechanics of pitting the six anterior teeth against the second bicuspid and first molars, to examine the rate of space closure of 100-gram and 200-gram nickel-titanium closed coil springs. The results for the three springs and elastic module were compared. The nickel-titanium closed coil springs produced a more consistent space closure than the elastic module. The 150- and 200-gram springs produced a faster rate of space closure than the elastic module or the 100-gram spring. No significant difference was noted between the rates of closure for the 150- and the 200-gram springs.

  14. Parents' Attitudes to the Closure of Small Rural Primary Schools

    Science.gov (United States)

    Archbold, A.; Nisbet, J.

    1977-01-01

    Attitudes of 134 parents of children from 10 rural schools threatened with closure, and 56 parents of children from seven schools recently closed, were assessed by interview. Most parents opposed closure, and most gave educational reasons for their attitudes. (Author)

  15. 300 Area Process Trenches Closure Plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1994-01-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ''co-operator.'' The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit

  16. Downstreamness: A concept to analyse basin closure

    NARCIS (Netherlands)

    van Oel, P.R.; Krol, Martinus S.; Hoekstra, Arjen Ysbert

    2011-01-01

    In many places in the world, increasing water demands have led to the development of infrastructure for freshwater storage and irrigation. Especially in water-scarce regions, this development has led to a growing number of concerns about basin closure. These concerns ask for a structured approach

  17. Scale separation closure and Alfven wave turbulence

    International Nuclear Information System (INIS)

    Chen, C.Y.; Mahajan, S.M.

    1985-04-01

    Based on the concept of scale separation between coherent response function and incoherent source for renormalized turbulence theories, a closure scheme is proposed. A model problem dealing with shear-Alfven wave turbulence is numerically solved; the solution explicitly shows expected turbulence features such as frequency shift from linear modes, band-broadening, and a power law dependence for the turbulence spectrum

  18. VACUUM ASSISTED CLOSURE IN DIABETIC FOOT MANAGEMENT

    OpenAIRE

    Moganakannan; `Prema; Arun Sundara Rajan

    2014-01-01

    Comparision of vacuum assisted closure vs conventional dressing in management of diabetic foot patients. 30 patients were taken in that 15 underwent vacuum therapy and remaining 15 underwent conventional dressing.They were analysed by the development of granulation tissue and wound healing.The study showed Vac therapy is the best modality for management of diabetic foot patients.

  19. Opening up closure. Semiotics across scales

    Science.gov (United States)

    Lemke

    2000-01-01

    The dynamic emergence of new levels of organization in complex systems is related to the semiotic reorganization of discrete/continuous variety at the level below as continuous/discrete meaning for the level above. In this view both the semiotic and the dynamic closure of system levels is reopened to allow the development and evolution of greater complexity.

  20. Individual Consequences of Plant Closures and Cutbacks

    DEFF Research Database (Denmark)

    Andersen, Steen

    1991-01-01

    This thesis describes the segment of unemployment which has its origin in major closures and cutbacks. The argument for this is to make it possible to describe and to analyse a flow into and a flow out of a population of unemployed. Given a major dismissal the following questions are to be answer...

  1. Hexone Storage and Treatment Facility closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The HSTF is a storage and treatment unit subject to the requirements for the storage and treatment of dangerous waste. Closure is being conducted under interim status and will be completed pursuant to the requirements of Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and WAC 173-303-640. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. The known hazardous/dangerous waste remaining at the site before commencing other closure activities consists of the still vessels, a tarry sludge in the storage tanks, and residual contamination in equipment, piping, filters, etc. The treatment and removal of waste at the HSTF are closure activities as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and WAC 173-303

  2. Synthesis of azaphenanthridines via anionic ring closure

    DEFF Research Database (Denmark)

    Hansen, Henriette Møller; Lysén, M.; Begtrup, M.

    2005-01-01

    A new and convergent synthesis of azaphenanthridines via an anionic ring closure is reported. Ortho-lithiation/in situ borylation of cyanopyridines produces the corresponding cyanopyridylboronic esters, which undergo a Suzuki-Miyaura cross-coupling to give the key intermediates. Addition of lithium...

  3. Spontaneous closure of traumatic CSF otorrhoea following ...

    African Journals Online (AJOL)

    We present a 40 year-old male who sustained a head injury with left cerebrospinal fluid otorrhoea following a road traffic accident. Plain radiograph revealed a defect in the temporal bone extending in to the tympanomastoid area. Patient was managed conservatively with closure of the fistula and resolution of the leakage ...

  4. A Quick Guide to Paravalvular Leak Closure

    Science.gov (United States)

    Gafoor, Sameer; Franke, Jennifer; Bertog, Stefan; Lam, Simon; Vaskelyte, Laura; Hofmann, Ilona; Matic, Predrag

    2015-01-01

    Paravalvular leak (PVL) is a seldomly covered aspect of structural heart disease. However, this is a condition that frequently presents after valvular replacement. This article will cover the diagnosising and treating PVL (i.e. imaging, access, and device selection). In addition, specific aspects of aortic and mitral PVL closure will be covered in this review. PMID:29588686

  5. Flower opening and closure: a review

    NARCIS (Netherlands)

    Doorn, van W.G.; Meeteren, van U.

    2003-01-01

    Flower opening and closure are traits of a reproductive syndrome, as it allows pollen removal and/or pollination. Various types of opening can be distinguished such as nocturnal and diurnal and single or repetitive. Opening is generally due to cell expansion. Osmotic solute levels increase by the

  6. Angle closure glaucoma in congenital ectropion uvea.

    Science.gov (United States)

    Wang, Grace M; Thuente, Daniel; Bohnsack, Brenda L

    2018-06-01

    Congenital ectropion uvea is a rare anomaly, which is associated with open, but dysplastic iridocorneal angles that cause childhood glaucoma. Herein, we present 3 cases of angle-closure glaucoma in children with congenital ectropion uvea. Three children were initially diagnosed with unilateral glaucoma secondary to congenital ectropion uvea at 7, 8 and 13 years of age. The three cases showed 360° of ectropion uvea and iris stromal atrophy in the affected eye. In one case, we have photographic documentation of progression to complete angle closure, which necessitated placement of a glaucoma drainage device 3 years after combined trabeculotomy and trabeculectomy. The 2 other cases, which presented as complete angle closure, also underwent glaucoma drainage device implantation. All three cases had early glaucoma drainage device encapsulation (within 4 months) and required additional surgery (cycloablation or trabeculectomy). Congenital ectropion uvea can be associated with angle-closure glaucoma, and placement of glaucoma drainage devices in all 3 of our cases showed early failure due to plate encapsulation. Glaucoma in congenital ectropion uvea requires attention to angle configuration and often requires multiple surgeries to obtain intraocular pressure control.

  7. Automatically closing swing gate closure assembly

    Science.gov (United States)

    Chang, Shih-Chih; Schuck, William J.; Gilmore, Richard F.

    1988-01-01

    A swing gate closure assembly for nuclear reactor tipoff assembly wherein the swing gate is cammed open by a fuel element or spacer but is reliably closed at a desired closing rate primarily by hydraulic forces in the absence of a fuel charge.

  8. Transcatheter Device Closure of Patent Ductus Arteriosus

    International Nuclear Information System (INIS)

    Sultan, M.; Ullah, M.; Sadiq, N.; Akhtar, K.; Akbar, H.

    2014-01-01

    Objective: To determine the efficacy, safety and immediate complications encountered during percutaneous device closure of patent ductus arteriosus (PDA). Study Design: Case series. Place and Duration of Study: Department of Paediatric Cardiology, AFIC/NIHD, Rawalpindi, from January 2005 to December 2010. Methodology: Consecutive 500 patients who underwent attempted transcatheter PDA device closure were included in the study. Device type position, success of closure and complications were described as frequency percentage. Results: In 491 cases (98.2%), PDA was successfully occluded including 4 cases (0.8%) where devices were dislodged but retrieved and redeployed in Cath laboratory. PDA occluder devices used in 448 cases (91%) while coils (single or multiple) were used in 42 cases (8.5%) and in one case (0.2%) ASD occluder device was used to occlude the PDA. There were 09 (1.8%) unsuccessful cases, 06 (1.2%) were abandoned as ducts were considered unsuitable for device closure, 02 (0.4%) devices dislodged and needed surgical retrieval and one case (0.2%) was abandoned due to faulty equipment. The narrowest PDA diameter ranged from 0.5 - 14 mm with mean of 4.5 +- 2.4 mm. There was a single (0.2%) mortality. Conclusion: Transcatheter occlusion of PDA by coil or occluder device is an effective therapeutic option with high success rate. Complication rate is low in the hands of skilled operators yet paediatric cardiac surgical back-up cover is mandatory. (author)

  9. Aluminum hydroxide issue closure package

    International Nuclear Information System (INIS)

    Bergman, T.B.

    1998-01-01

    Aluminum hydroxide coatings on fuel elements stored in aluminum canisters in K West Basin were measured in July and August 1998. Good quality data was produced that enabled statistical analysis to determine a bounding value for aluminum hydroxide at a 99% confidence level. The updated bounding value is 10.6 kg per Multi-Canister Overpack (MCO), compared to the previously estimated bounding value of 8 kg/MCO. Thermal analysis using the updated bounding value, shows that the MCO generates oxygen concentrate that are below the lower flammability limits during the 40-year interim storage period and are, therefore, acceptable

  10. Single versus double-layer uterine closure at cesarean: impact on lower uterine segment thickness at next pregnancy.

    Science.gov (United States)

    Vachon-Marceau, Chantale; Demers, Suzanne; Bujold, Emmanuel; Roberge, Stephanie; Gauthier, Robert J; Pasquier, Jean-Charles; Girard, Mario; Chaillet, Nils; Boulvain, Michel; Jastrow, Nicole

    2017-07-01

    Uterine rupture is a potential life-threatening complication during a trial of labor after cesarean delivery. Single-layer closure of the uterus at cesarean delivery has been associated with an increased risk of uterine rupture compared with double-layer closure. Lower uterine segment thickness measurement by ultrasound has been used to evaluate the quality of the uterine scar after cesarean delivery and is associated with the risk of uterine rupture. To estimate the impact of previous uterine closure on lower uterine segment thickness. Women with a previous single low-transverse cesarean delivery were recruited at 34-38 weeks' gestation. Transabdominal and transvaginal ultrasound evaluation of the lower uterine segment thickness was performed by a sonographer blinded to clinical data. Previous operative reports were reviewed to obtain the type of previous uterine closure. Third-trimester lower uterine segment thickness at the next pregnancy was compared according to the number of layers sutured and according to the type of thread for uterine closure, using weighted mean differences and multivariate logistic regression analyses. Of 1613 women recruited, with operative reports available, 495 (31%) had a single-layer and 1118 (69%) had a double-layer closure. The mean third-trimester lower uterine segment thickness was 3.3 ± 1.3 mm and the proportion with lower uterine segment thickness cesarean delivery is associated with a thicker third-trimester lower uterine segment and a reduced risk of lower uterine segment thickness <2.0 mm in the next pregnancy. The type of thread for uterine closure has no significant impact on lower uterine segment thickness. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. Primary closure after carotid endarterectomy is not inferior to other closure techniques.

    Science.gov (United States)

    Avgerinos, Efthymios D; Chaer, Rabih A; Naddaf, Abdallah; El-Shazly, Omar M; Marone, Luke; Makaroun, Michel S

    2016-09-01

    Primary closure after carotid endarterectomy (CEA) has been much maligned as an inferior technique with worse outcomes than in patch closure. Our purpose was to compare perioperative and long-term results of different CEA closure techniques in a large institutional experience. A consecutive cohort of CEAs between January 1, 2000, and December 31, 2010, was retrospectively analyzed. Closure technique was used to divide patients into three groups: primary longitudinal arteriotomy closure (PRC), patch closure (PAC), and eversion closure (EVC). End points were perioperative events, long-term strokes, and restenosis ≥70%. Multivariate regression models were used to assess the effect of baseline predictors. There were 1737 CEA cases (bilateral, 143; mean age, 71.4 ± 9.3 years; 56.2% men; 35.3% symptomatic) performed during the study period with a mean clinical follow-up of 49.8 ± 36.4 months (range, 0-155 months). More men had primary closure, but other demographic and baseline symptoms were similar between groups. Half the patients had PAC, with the rest evenly distributed between PRC and EVC. The rate of nerve injury was 2.7%, the rate of reintervention for hematoma was 1.5%, and the length of hospital stay was 2.4 ± 3.0 days, with no significant differences among groups. The combined stroke and death rate was 2.5% overall and 3.9% and 1.7% in the symptomatic and asymptomatic cohort, respectively. Stroke and death rates were similar between groups: PRC, 11 (2.7%); PAC, 19 (2.2%); EVC, 13 (2.9%). Multivariate analysis showed baseline symptomatic disease (odds ratio, 2.4; P = .007) and heart failure (odds ratio, 3.1; P = .003) as predictors of perioperative stroke and death, but not the type of closure. Cox regression analysis demonstrated, among other risk factors, no statin use (hazard ratio, 2.1; P = .008) as a predictor of ipsilateral stroke and severe (glomerular filtration rate <30 mL/min/1.73 m(2)) renal insufficiency (hazard ratio, 2.6; P

  12. Long-Term Outcomes of Patent Foramen Ovale Closure or Medical Therapy after Stroke.

    Science.gov (United States)

    Saver, Jeffrey L; Carroll, John D; Thaler, David E; Smalling, Richard W; MacDonald, Lee A; Marks, David S; Tirschwell, David L

    2017-09-14

    Whether closure of a patent foramen ovale reduces the risk of recurrence of ischemic stroke in patients who have had a cryptogenic ischemic stroke is unknown. In a multicenter, randomized, open-label trial, with blinded adjudication of end-point events, we randomly assigned patients 18 to 60 years of age who had a patent foramen ovale (PFO) and had had a cryptogenic ischemic stroke to undergo closure of the PFO (PFO closure group) or to receive medical therapy alone (aspirin, warfarin, clopidogrel, or aspirin combined with extended-release dipyridamole; medical-therapy group). The primary efficacy end point was a composite of recurrent nonfatal ischemic stroke, fatal ischemic stroke, or early death after randomization. The results of the analysis of the primary outcome from the original trial period have been reported previously; the current analysis of data from the extended follow-up period was considered to be exploratory. We enrolled 980 patients (mean age, 45.9 years) at 69 sites. Patients were followed for a median of 5.9 years. Treatment exposure in the two groups was unequal (3141 patient-years in the PFO closure group vs. 2669 patient-years in the medical-therapy group), owing to a higher dropout rate in the medical-therapy group. In the intention-to-treat population, recurrent ischemic stroke occurred in 18 patients in the PFO closure group and in 28 patients in the medical-therapy group, resulting in rates of 0.58 events per 100 patient-years and 1.07 events per 100 patient-years, respectively (hazard ratio with PFO closure vs. medical therapy, 0.55; 95% confidence interval [CI], 0.31 to 0.999; P=0.046 by the log-rank test). Recurrent ischemic stroke of undetermined cause occurred in 10 patients in the PFO closure group and in 23 patients in the medical-therapy group (hazard ratio, 0.38; 95% CI, 0.18 to 0.79; P=0.007). Venous thromboembolism (which comprised events of pulmonary embolism and deep-vein thrombosis) was more common in the PFO closure group

  13. Comparison of fasciotomy wound closures using traditional dressing changes and the vacuum-assisted closure device.

    Science.gov (United States)

    Zannis, John; Angobaldo, Jeff; Marks, Malcolm; DeFranzo, Anthony; David, Lisa; Molnar, Joseph; Argenta, Louis

    2009-04-01

    Fasciotomy wounds can be a major contributor to length of stay for patients as well as a difficult reconstructive challenge. Once the compartment pressure has been relieved and stabilized, the wound should be closed as quickly and early as possible to avoid later complications. Skin grafting can lead to morbidity and scarring at both the donor and fasciotomy site. Primary closure results in a more functional and esthetic outcome with less morbidity for the patient, but can often be difficult to achieve secondary to edema, skin retraction, and skin edge necrosis. Our objective was to examine fasciotomy wound outcomes, including time to definitive closure, comparing traditional wet-to-dry dressings, and the vacuum-assisted closure (VAC) device. This retrospective chart review included a consecutive series of patients over a 10-year period. This series included 458 patients who underwent 804 fasciotomies. Of these fasciotomy wounds, 438 received exclusively VAC. dressings, 270 received only normal saline wet-to-dry dressings, and 96 were treated with a combination of both. Of the sample, 408 patients were treated with exclusively VAC therapy or wet-to-dry dressings and 50 patients were treated with a combination of both. In comparing all wounds, there was a statistically significant higher rate of primary closure using the VAC versus traditional wet-to-dry dressings (P lower extremities and P extremities). The time to primary closure of wounds was shorter in the VAC. group in comparison with the non-VAC group. This study has shown that the use of the VAC for fasciotomy wound closure results in a higher rate of primary closure versus traditional wet-to-dry dressings. In addition, the time to primary closure of wounds or time to skin grafting is shorter when the VAC was employed. The VAC used in the described settings decreases hospitalization time, allows for earlier rehabilitation, and ultimately leads to increased patient satisfaction.

  14. The Rising Rate of Rural Hospital Closures.

    Science.gov (United States)

    Kaufman, Brystana G; Thomas, Sharita R; Randolph, Randy K; Perry, Julie R; Thompson, Kristie W; Holmes, George M; Pink, George H

    2016-01-01

    Since 2010, the rate of rural hospital closures has increased significantly. This study is a preliminary look at recent closures and a formative step in research to understand the causes and the impact on rural communities. The 2009 financial performance and market characteristics of rural hospitals that closed from 2010 through 2014 were compared to rural hospitals that remained open during the same period, stratified by critical access hospitals (CAHs) and other rural hospitals (ORHs). Differences were tested using Pearson's chi-square (categorical variables) and Wilcoxon rank test of medians. The relationships between negative operating margin and (1) market factors and (2) utilization/staffing factors were explored using logistic regression. In 2009, CAHs that subsequently closed from 2010 through 2014 had, in general, lower levels of profitability, liquidity, equity, patient volume, and staffing. In addition, ORHs that closed had smaller market shares and operated in markets with smaller populations compared to ORHs that remained open. Odds of unprofitability were associated with both market and utilization factors. Although half of the closed hospitals ceased providing health services altogether, the remainder have since converted to an alternative health care delivery model. Financial and market characteristics appear to be associated with closure of rural hospitals from 2010 through 2014, suggesting that it is possible to identify hospitals at risk of closure. As closure rates show no sign of abating, it is important to study the drivers of distress in rural hospitals, as well as the potential for alternative health care delivery models. © 2015 National Rural Health Association.

  15. 9 CFR 318.301 - Containers and closures.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Containers and closures. 318.301... Canning and Canned Products § 318.301 Containers and closures. (a) Examination and cleaning of empty containers. (1) Empty containers, closures, and flexible pouch roll stock shall be evaluated by the...

  16. Crack closure and sequential effects in fatigue: A literature survey

    Science.gov (United States)

    Holmgren, M.

    A literature survey of the phenomenon of crack closure is reported here. The state of the art is reviewed and several empirical formulas for determining the crack closure are compared with each other. Their properties, advantages and disadvantages are briefly discussed. Experimental techniques for determining the crack closure stress are presented and experimental data from the literature are reported.

  17. 40 CFR 267.143 - Financial assurance for closure.

    Science.gov (United States)

    2010-07-01

    ...), utilizing the certificate of insurance for closure specified at 40 CFR 264.151(e). (f) Corporate financial... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Financial assurance for closure. 267... PERMIT Financial Requirements § 267.143 Financial assurance for closure. The owner or operator must...

  18. Permanent Closure of the TAN-664 Underground Storage Tank

    Energy Technology Data Exchange (ETDEWEB)

    Bradley K. Griffith

    2011-12-01

    This closure package documents the site assessment and permanent closure of the TAN-664 gasoline underground storage tank in accordance with the regulatory requirements established in 40 CFR 280.71, 'Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.'

  19. Numerical approximation of the Boltzmann equation : moment closure

    NARCIS (Netherlands)

    Abdel Malik, M.R.A.; Brummelen, van E.H.

    2012-01-01

    This work applies the moment method onto a generic form of kinetic equations to simplify kinetic models of particle systems. This leads to the moment closure problem which is addressed using entropy-based moment closure techniques utilizing entropy minimization. The resulting moment closure system

  20. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  1. RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-04-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. In January 1993, the Closure Plan was revised to include inspection and maintenance criteria and to reflect that future monitoring and remediation would be conducted as part of the ongoing Comprehensive Environmental Response, Compensation, and Liability Act activities at the Oak Ridge Y-12 Plant. This Closure Plan revision is intended to reflect the placement of the Kerr Hollow Quarry debris at the Walk-In Pits, revise the closure dates, and acknowledge that the disposition of a monitoring well within the closure site cannot be verified

  2. Vedolizumab: first global approval.

    Science.gov (United States)

    Poole, Raewyn M

    2014-07-01

    Vedolizumab [Entyvio(®) (US, Europe)], a humanized monoclonal antibody α4β7 integrin receptor antagonist, has been developed by Millennium Pharmaceuticals (d/b/a Takeda Pharmaceuticals International) for the treatment of ulcerative colitis and Crohn's disease. Vedolizumab has received its first global approval for the treatment of ulcerative colitis and Crohn's disease in the US, for use in adult patients with moderate-to-severe disease who have had an inadequate response, loss of response or intolerance to one or more standard therapies (corticosteroids, immunomodulators or tumour necrosis factor-α inhibitor) or demonstrated dependence on corticosteroids. Vedolizumab has since been approved for ulcerative colitis and Crohn's disease in the EU, Norway, Iceland and Liechtenstein. This article summarizes the milestones in the development of vedolizumab leading to its first approval for the treatment of ulcerative colitis and Crohn's disease.

  3. Revisit to Grad's Closure and Development of Physically Motivated Closure for Phenomenological High-Order Moment Model

    International Nuclear Information System (INIS)

    Myong, R. S.; Nagdewe, S. P.

    2011-01-01

    The Grad's closure for the high-order moment equation is revisited and, by extending his theory, a physically motivated closure is developed for the one-dimensional velocity shear gas flow. The closure is based on the physical argument of the relative importance of various terms appearing in the moment equation. Also, the closure is derived such that the resulting theory may be inclusive of the well established linear theory (Navier-Stokes-Fourier) as limiting case near local thermal equilibrium.

  4. Temporary Closure of the Open Abdomen: A Systematic Review on Delayed Primary Fascial Closure in Patients with an Open Abdomen

    NARCIS (Netherlands)

    Boele van Hensbroek, Pieter; Wind, Jan; Dijkgraaf, Marcel G. W.; Busch, Olivier R. C.; Goslings, J. Carel

    2009-01-01

    Background This study was designed to systematically review the literature to assess which temporary abdominal closure (TAC) technique is associated with the highest delayed primary fascial closure (FC) rate. In some cases of abdominal trauma or infection, edema or packing precludes fascial closure

  5. Transient severe left ventricular dysfunction following percutaneous patent ductus arteriosus closure in an adult with bicuspid aortic valve: A case report.

    Science.gov (United States)

    Hwang, Hui-Jeong; Yoon, Kyung Lim; Sohn, Il Suk

    2016-03-01

    The present study reported the case of a 60-year-old female with patent ductus arteriosus (PDA) and a bicuspid aortic valve, who presented with transient severe left ventricular (LV) dysfunction following percutaneous closure of PDA, as identified by speckle tracking analysis. Transient LV dysfunction following PDA closure has previously been reported; however, severe LV dysfunction is rare. In the present case, the combination of a large PDA size, large amount of shunting, LV remodeling and bicuspid aortic valve may have induced serious deterioration of LV function following PDA closure. Furthermore, speckle-tracking echocardiography may be useful in the estimation of functional alterations in the myocardium of the LV following PDA closure. The observations detailed in the present study may improve the understanding of the pathophysiology and myocardial patterns of transient left ventricular dysfunction following PDA closure in adult humans.

  6. Assessment of consistent two-equation closure for forest flows

    DEFF Research Database (Denmark)

    Sogachev, Andrey; Cavar, Dalibor; Bechmann, Andreas

    of grid turbulence and wall-bounded flow, the closure suggested is also valid for homogeneous shear flows commonly observed inside tall vegetative canopies. The present work assess the plant drag closure by comparing results of two different CFD models against observations derived over the forested area...... and can be applied for any twoequation closure. Results derived by different CFD models with k-epsilon and k-omega closure are similar and in good comparison with observations. Overall, numerical results show that the closure performs well, opening new possibilities for application to tasks related...... to the atmospheric boundary layer—where it is important to adequately account for the influences of vegetation....

  7. Trastuzumab emtansine: first global approval.

    Science.gov (United States)

    Ballantyne, Anita; Dhillon, Sohita

    2013-05-01

    Genentech and ImmunoGen are collaborating on the development of trastuzumab emtansine, a HER2 antibody-drug conjugate that comprises Genentech's trastuzumab antibody linked to ImmunoGen's anti-mitotic agent, mertansine (a maytansine derivative; also known as DM1). The conjugate combines two strategies: the anti-HER2 activity of trastuzumab, and the targeted intracellular delivery of mertansine, a tubulin polymerisation inhibitor which interferes with mitosis and promotes apoptosis. The linker in trastuzumab emtansine is a non-reducible thioether linker, N-succinimidyl-4-(N-maleimidomethyl) cyclohexane-1-carboxylate (SMCC, designated MCC after conjugation). Trastuzumab emtansine (Kadcyla™) has been launched in the USA as second-line monotherapy for HER2-positive metastatic breast cancer, and has been filed for approval in the EU and Japan in this indication. Trastuzumab emtansine is in phase III development as first-line combination therapy or monotherapy for metastatic HER2-positive breast cancer, and as third-line monotherapy for metastatic HER2-positive breast cancer. Phase II development is underway for early-stage breast cancer and phase II/III development is underway in patients with HER2-positive gastric cancer. This article summarizes the milestones in the development of trastuzumab emtansine leading to this first approval for the treatment of patients with HER2-positive, metastatic breast cancer who previously received trastuzumab and a taxane, separately or in combination.

  8. Information collection regarding geoscientific monitoring techniques during closure of underground facility in crystalline rock

    International Nuclear Information System (INIS)

    Hosoya, Shinichi; Yamashita, Tadashi; Iwatsuki, Teruki; Saegusa, Hiromitsu; Onoe, Hironori; Ishibashi, Masayuki

    2016-01-01

    The Mizunami Underground Research Laboratory (MIU) project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of geological disposal technologies through investigations of the deep geological environment in the crystalline host rock (granite) at Mizunami City in Gifu Prefecture, central Japan. On the occasion of the reform of the entire JAEA organization in 2014, JAEA identified the critical issues on the geoscientific research program: “Development of modelling technologies for mass transport”, “Development of drift backfilling technologies” and “Development of technologies for reducing groundwater inflow”, based on the latest results of the synthesizing R and D. The purposes of the “Development of drift backfilling technologies” are to develop closure methodology and technology, and long-term monitoring technology, and to evaluate resilience of geological environment. In order to achieve the purposes, previous information from the case example of underground facility constructed in crystalline rock in Europe has been collected in this study. In particular, the boundary conditions for the closure, geological characteristics, technical specifications, and method of monitoring have been focused. The information on the international project regarding drift closure test and development of monitoring technologies has also been collected. In addition, interviews were conducted to Finnish and Swedish specialists who have experiences involving planning, construction management, monitoring, and safety assessment for the closure to obtain the technical knowledge. Based on the collected information, concept and point of attention, which are regarding drift closure testing, and planning, execution management and monitoring on the closure of MIU, have been specified. (author)

  9. Resource Conservation and Recovery Act Closure Plan for the Y-12 9409-5 Tank Storage Facility

    International Nuclear Information System (INIS)

    1995-02-01

    This document presents information on the closure of the Y-12 9409-5 Tank Storage Facility. Topics discussed include: facility description; closure history; closure performance standard; partial closure; maximum waste inventory; closure activities; schedule; and postclosure care

  10. CORN, LP Goldfield Approval

    Science.gov (United States)

    This November 19, 2015 letter from EPA approves the petition from CORN, LP, Goldfield facility, regarding non-grandfathered ethanol produced through a dry mill process, qualifying under the Clean Air Act for renewable fuel (D-code 6) RINs under the RFS pro

  11. Poet Fostoria Approval

    Science.gov (United States)

    This August 9, 2016 letter from EPA approves, with modifications, the petition from Poet Biorefining-Fostoria, LLC, regarding non-grandfathered ethanol produced through a dry mill process, qualifying under the Clean Air Act for renewable fuel (D-code 6)

  12. Poet Lake Crystal Approval

    Science.gov (United States)

    This September 19, 2016 letter from EPA approves the petition from Poet Biorefining-Lake Crystal, regarding non-grandfathered ethanol produced through a dry mill process, qualifying under the Clean Air Act for renewable fuel (D-code 6) RINs under the RFS

  13. Poet Leipsic Approval

    Science.gov (United States)

    This August 9, 2016 letter from EPA approves,wtih modifications, the petition from Poet Biorefining-Leipsic, LLC, regarding non-grandfathered ethanol produced through a dry mill process, qualifying under the Clean Air Act for renewable fuel (D-code 6) RINs

  14. Drugs Approved for Rhabdomyosarcoma

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for rhabdomyosarcoma. The list includes generic names and brand names. The drug names link to NCI's Cancer Drug Information summaries. There may be drugs used in rhabdomyosarcoma that are not listed here.

  15. A Good Year: FDA Approved Nine New Cancer Drugs in 2014

    Science.gov (United States)

    In 2014, the Food and Drug Administration (FDA) approved 41 drugs that had not been approved previously for any indication, the most in nearly 20 years. Of these 41 novel drugs, 9 were approved for the treatment of cancer or cancer-related conditions.

  16. Echocardiographic predictors of coil vs device closure in patients undergoing percutaneous patent ductus arteriosus closure.

    Science.gov (United States)

    Roushdy, Alaa; Abd El Razek, Yasmeen; Mamdouh Tawfik, Ahmed

    2018-01-01

    To determine anatomic and hemodynamic echocardiographic predictors for patent ductus arteriosus (PDA) device vs coil closure. Seventy-six patients who were referred for elective transcatheter PDA closure were enrolled in the study. All patients underwent full echocardiogram including measurement of the PDA pulmonary end diameter, color flow width and extent, peak and end-diastolic Doppler gradients across the duct, diastolic flow reversal, left atrial dimensions and volume, left ventricular sphericity index, and volumes. The study group was subdivided into 2 subgroups based on the mode of PDA closure whether by coil (n = 42) or device (n = 34). Using univariate analysis there was a highly significant difference between the 2 groups as regard the pulmonary end diameter measured in both the suprasternal and parasternal short-axis views as well as the color flow width and color flow extent (P closure group had statistically significant higher end-systolic and end-diastolic volumes indexed, left atrial volume, and diastolic flow reversal. Receiver operating characteristic curve analysis showed a pulmonary end diameter cutoff point from the suprasternal view > 2.5 mm and from parasternal short-axis view > 2.61 mm to have the highest balanced sensitivity and specificity to predict the likelihood for device closure (AUC 0.971 and 0.979 respectively). The pulmonary end diameter measured from the suprasternal view was the most independent predictor of device closure. The selection between PDA coil or device closure can be done on the basis of multiple anatomic and hemodynamic echocardiographic variables. © 2017 Wiley Periodicals, Inc.

  17. Preliminary creep and pillar closure data for shales

    International Nuclear Information System (INIS)

    Lomenick, T.F.; Russell, J.E.

    1987-10-01

    The results of fourteen laboratory creep tests on model pillars of four different shales are reported. Initial pillar stresses range from 6.9 MPa (1000 psi) to 69 MPa (10,000 psi) and temperatures range from ambient to 100 0 C. Laboratory response data are used to evaluate the parameters in the transient power-law pillar closure equation similar to that previously used for model pillars of rock salt. The response of the model pillars of shale shows many of the same characteristics as for rock salt. Deformation is enhanced by higher stresses and temperatures, although the shale pillars are not as sensitive to either stress or temperature as are pillars of rock salt. These test results must be considered very preliminary since they represent the initial, or scoping, phase of a comprehensive model pillar test program that will lead to the development and validation of creep laws for clay-rich rocks. 11 refs., 9 figs., 7 tabs

  18. Availability of services during CERN's Annual Closure 2012/2013

    CERN Multimedia

    2012-01-01

    General Services As every year, all the services provided by the GS Department requiring human presence (like the CERN hotel, car sharing service, shuttle service, etc.) will ceased during the annual closure. Services that do not depend on continuous human presence will remain available.  Support levels are reduced during this period. In general, the target reaction time for problems will be half a day (no guaranteed). In case of failure, the reaction time for restoration of services depends on the arrangements that have been made on a service-by-service basis. Service outages will be documented on the status board. For more detailed information please consult the service portal. Please also note that this year, unlike previous years, the heating will not be cut but idle. This reduced level is equal to weekend operation and should be relatively comfortable. Computing Services Most of the services provided by the IT Department - including WLCG production services - will rem...

  19. AREA COMPLETION STRATEGIES AT SAVANNAH RIVER SITE: CHARACTERIZATION FOR CLOSURE AND BEYOND

    International Nuclear Information System (INIS)

    Bagwell, L; Mark Amidon, M; Sadika Baladi, S

    2007-01-01

    During the first four decades of its 56 year existence, the Savannah River Site (SRS) was a key supplier of nuclear material for national defense. During the 1990s, the site's primary missions became waste site closure, environmental restoration, and deactivation and decommissioning (D and D) of remnant cold war apparatus. Since 1989, with the approval of State and Federal regulatory agencies and with the participation of interested stakeholders, SRS has implemented a final remedy for a majority of the more than 500 individual waste sites at the former nuclear materials complex. These waste sites range from small, inert rubble pits to large, heavy industrial areas and radioactive waste disposal grounds. The closure and final remediation of these waste sites mark significant progress toward achieving SRS's overarching goal of reducing or eliminating future environmental damage and human health threats. However, larger challenges remain. For example, what are appropriate and achievable end-states for decommissioned nuclear facilities? What environmental and human health risks are associated with these end-states? To answer these questions within the strictures of smaller budgets and accelerated schedules, SRS is implementing an ''area completion'' strategy that: (1) unites several discrete waste units into one conceptual model, (2) integrates historically disparate environmental characterization and D and D activities, (3) reduces the number of required regulatory documents, and (4) in some cases, compresses schedules for achieving a stakeholder-approved end-state

  20. AREA COMPLETION STRATEGIES AT SAVANNAH RIVER SITE: CHARACTERIZATION FOR CLOSURE AND BEYOND

    Energy Technology Data Exchange (ETDEWEB)

    Bagwell, L; Mark Amidon, M; Sadika Baladi, S

    2007-06-11

    During the first four decades of its 56 year existence, the Savannah River Site (SRS) was a key supplier of nuclear material for national defense. During the 1990s, the site's primary missions became waste site closure, environmental restoration, and deactivation and decommissioning (D&D) of remnant cold war apparatus. Since 1989, with the approval of State and Federal regulatory agencies and with the participation of interested stakeholders, SRS has implemented a final remedy for a majority of the more than 500 individual waste sites at the former nuclear materials complex. These waste sites range from small, inert rubble pits to large, heavy industrial areas and radioactive waste disposal grounds. The closure and final remediation of these waste sites mark significant progress toward achieving SRS's overarching goal of reducing or eliminating future environmental damage and human health threats. However, larger challenges remain. For example, what are appropriate and achievable end-states for decommissioned nuclear facilities? What environmental and human health risks are associated with these end-states? To answer these questions within the strictures of smaller budgets and accelerated schedules, SRS is implementing an ''area completion'' strategy that: (1) unites several discrete waste units into one conceptual model, (2) integrates historically disparate environmental characterization and D&D activities, (3) reduces the number of required regulatory documents, and (4) in some cases, compresses schedules for achieving a stakeholder-approved end-state.

  1. A regenerative approach towards mucosal fenestration closure

    Science.gov (United States)

    Gandi, Padma; Anumala, Naveen; Reddy, Amarender; Viswa Chandra, Rampalli

    2013-01-01

    Mucosal fenestration is an opening or an interstice through the oral mucosa. A lesion which occurs with greater frequency than generally realised, its occurrence is attributed to a myriad of causes. Mucogingival procedures including connective tissue grafts, free gingival grafts and lateral pedicle grafts are generally considered to be the treatment of choice in the closure of a mucosal fenestration. More often, these procedures are performed in conjunction with other procedures such as periradicular surgery and with bone grafts. However, the concomitant use of gingival grafts and bone grafts in mucosal fenestrations secondary to infections in sites exhibiting severe bone loss is highly debatable. In this article, we report two cases of mucosal fenestrations secondary to trauma and their management by regenerative periodontal surgery with the placement of guided tissue regeneration membrane and bone graft. The final outcome was a complete closure of the fenestration in both the cases. PMID:23749826

  2. Improving environmental performance through mine closure planning

    International Nuclear Information System (INIS)

    McKee, W.; McKenna, G.

    1998-01-01

    Syncrude has been investigating landscape redevelopment concepts since 1995 after a two-year tailings technology selection study resulted in a major shift in their long-term tailings disposal strategy. The change from fluid disposal to solid disposal of tailings leads to a different landscape, incorporating a new water material type, new landforms and a new schedule of reclamation activity. A multidisciplinary approach was needed to assess, design and develop the final landscape. Planning approach in progress at Syncrude Canada was described, and the basic concepts and tools of closure planning discovered to date were outlined. The economic impacts of closure planning on mining and tailings operations in general, were discussed. 14 refs

  3. Theater gateway closure: a strategic level barricade

    Science.gov (United States)

    logistical planners at the strategic level can anticipate or mitigate the effects of a theater gateway closure on military operations. Through two...that at the strategic level the effects are based on the economic and diplomatic elements of the national power, affecting proportionally sustainment...Finally, logistical planners at the strategic level need to have a vast and ample knowledge and understanding of the operational environment to

  4. Calcined solids storage facility closure study

    International Nuclear Information System (INIS)

    Dahlmeir, M.M.; Tuott, L.C.; Spaulding, B.C.

    1998-02-01

    The disposal of radioactive wastes now stored at the Idaho National Engineering and Environmental Laboratory is currently mandated under a open-quotes Settlement Agreementclose quotes (or open-quotes Batt Agreementclose quotes) between the Department of Energy and the State of Idaho. Under this agreement, all high-level waste must be treated as necessary to meet the disposal criteria and disposed of or made road ready to ship from the INEEL by 2035. In order to comply with this agreement, all calcined waste produced in the New Waste Calcining Facility and stored in the Calcined Solids Facility must be treated and disposed of by 2035. Several treatment options for the calcined waste have been studied in support of the High-Level Waste Environmental Impact Statement. Two treatment methods studied, referred to as the TRU Waste Separations Options, involve the separation of the high-level waste (calcine) into TRU waste and low-level waste (Class A or Class C). Following treatment, the TRU waste would be sent to the Waste Isolation Pilot Plant (WIPP) for final storage. It has been proposed that the low-level waste be disposed of in the Tank Farm Facility and/or the Calcined Solids Storage Facility following Resource Conservation and Recovery Act closure. In order to use the seven Bin Sets making up the Calcined Solids Storage Facility as a low-level waste landfill, the facility must first be closed to Resource Conservation and Recovery Act (RCRA) standards. This study identifies and discusses two basic methods available to close the Calcined Solids Storage Facility under the RCRA - Risk-Based Clean Closure and Closure to Landfill Standards. In addition to the closure methods, the regulatory requirements and issues associated with turning the Calcined Solids Storage Facility into an NRC low-level waste landfill or filling the bin voids with clean grout are discussed

  5. Base Closure: A Road Map for Completion

    Science.gov (United States)

    1991-03-22

    leadership . At the same time, he should issue written press releases. Selected senior leaders from the base should be briefed separately from key community...they will hold with other agencies on base. These matters should be the commander’s call; they will reflect his style of leadership and preference for...base closure. He alone must foresee what can most likely go wrong as well as what should go right in this arduous process. DCNSIZING AN ORGANIZATIN The

  6. The Galois closure of Drinfeld modular towers

    DEFF Research Database (Denmark)

    Bassa, Alp; Beelen, Peter

    2011-01-01

    In this article we study Drinfeld modular curves X0(pn) associated to congruence subgroups Γ0(pn) of GL(2,Fq[T]) where p is a prime of Fq[T]. For n>r>0 we compute the extension degrees and investigate the structure of the Galois closures of the covers X0(pn)→X0(pr) and some of their variations...

  7. Calcined solids storage facility closure study

    Energy Technology Data Exchange (ETDEWEB)

    Dahlmeir, M.M.; Tuott, L.C.; Spaulding, B.C. [and others

    1998-02-01

    The disposal of radioactive wastes now stored at the Idaho National Engineering and Environmental Laboratory is currently mandated under a {open_quotes}Settlement Agreement{close_quotes} (or {open_quotes}Batt Agreement{close_quotes}) between the Department of Energy and the State of Idaho. Under this agreement, all high-level waste must be treated as necessary to meet the disposal criteria and disposed of or made road ready to ship from the INEEL by 2035. In order to comply with this agreement, all calcined waste produced in the New Waste Calcining Facility and stored in the Calcined Solids Facility must be treated and disposed of by 2035. Several treatment options for the calcined waste have been studied in support of the High-Level Waste Environmental Impact Statement. Two treatment methods studied, referred to as the TRU Waste Separations Options, involve the separation of the high-level waste (calcine) into TRU waste and low-level waste (Class A or Class C). Following treatment, the TRU waste would be sent to the Waste Isolation Pilot Plant (WIPP) for final storage. It has been proposed that the low-level waste be disposed of in the Tank Farm Facility and/or the Calcined Solids Storage Facility following Resource Conservation and Recovery Act closure. In order to use the seven Bin Sets making up the Calcined Solids Storage Facility as a low-level waste landfill, the facility must first be closed to Resource Conservation and Recovery Act (RCRA) standards. This study identifies and discusses two basic methods available to close the Calcined Solids Storage Facility under the RCRA - Risk-Based Clean Closure and Closure to Landfill Standards. In addition to the closure methods, the regulatory requirements and issues associated with turning the Calcined Solids Storage Facility into an NRC low-level waste landfill or filling the bin voids with clean grout are discussed.

  8. Evaluation of Two Energy Balance Closure Parametrizations

    Science.gov (United States)

    Eder, Fabian; De Roo, Frederik; Kohnert, Katrin; Desjardins, Raymond L.; Schmid, Hans Peter; Mauder, Matthias

    2014-05-01

    A general lack of energy balance closure indicates that tower-based eddy-covariance (EC) measurements underestimate turbulent heat fluxes, which calls for robust correction schemes. Two parametrization approaches that can be found in the literature were tested using data from the Canadian Twin Otter research aircraft and from tower-based measurements of the German Terrestrial Environmental Observatories (TERENO) programme. Our analysis shows that the approach of Huang et al. (Boundary-Layer Meteorol 127:273-292, 2008), based on large-eddy simulation, is not applicable to typical near-surface flux measurements because it was developed for heights above the surface layer and over homogeneous terrain. The biggest shortcoming of this parametrization is that the grid resolution of the model was too coarse so that the surface layer, where EC measurements are usually made, is not properly resolved. The empirical approach of Panin and Bernhofer (Izvestiya Atmos Oceanic Phys 44:701-716, 2008) considers landscape-level roughness heterogeneities that induce secondary circulations and at least gives a qualitative estimate of the energy balance closure. However, it does not consider any feature of landscape-scale heterogeneity other than surface roughness, such as surface temperature, surface moisture or topography. The failures of both approaches might indicate that the influence of mesoscale structures is not a sufficient explanation for the energy balance closure problem. However, our analysis of different wind-direction sectors shows that the upwind landscape-scale heterogeneity indeed influences the energy balance closure determined from tower flux data. We also analyzed the aircraft measurements with respect to the partitioning of the "missing energy" between sensible and latent heat fluxes and we could confirm the assumption of scalar similarity only for Bowen ratios 1.

  9. Phenomenology of convection-parameterization closure

    Directory of Open Access Journals (Sweden)

    J.-I. Yano

    2013-04-01

    Full Text Available Closure is a problem of defining the convective intensity in a given parameterization. In spite of many years of efforts and progress, it is still considered an overall unresolved problem. The present article reviews this problem from phenomenological perspectives. The physical variables that may contribute in defining the convective intensity are listed, and their statistical significances identified by observational data analyses are reviewed. A possibility is discussed for identifying a correct closure hypothesis by performing a linear stability analysis of tropical convectively coupled waves with various different closure hypotheses. Various individual theoretical issues are considered from various different perspectives. The review also emphasizes that the dominant physical factors controlling convection differ between the tropics and extra-tropics, as well as between oceanic and land areas. Both observational as well as theoretical analyses, often focused on the tropics, do not necessarily lead to conclusions consistent with our operational experiences focused on midlatitudes. Though we emphasize the importance of the interplays between these observational, theoretical and operational perspectives, we also face challenges for establishing a solid research framework that is universally applicable. An energy cycle framework is suggested as such a candidate.

  10. Stochastic particle acceleration and statistical closures

    International Nuclear Information System (INIS)

    Dimits, A.M.; Krommes, J.A.

    1985-10-01

    In a recent paper, Maasjost and Elsasser (ME) concluded, from the results of numerical experiments and heuristic arguments, that the Bourret and the direct-interaction approximation (DIA) are ''of no use in connection with the stochastic acceleration problem'' because (1) their predictions were equivalent to that of the simpler Fokker-Planck (FP) theory, and (2) either all or none of the closures were in good agreement with the data. Here some analytically tractable cases are studied and used to test the accuracy of these closures. The cause of the discrepancy (2) is found to be the highly non-Gaussian nature of the force used by ME, a point not stressed by them. For the case where the force is a position-independent Ornstein-Uhlenbeck (i.e., Gaussian) process, an effective Kubo number K can be defined. For K << 1 an FP description is adequate, and conclusion (1) of ME follows; however, for K greater than or equal to 1 the DIA behaves much better qualitatively than the other two closures. For the non-Gaussian stochastic force used by ME, all common approximations fail, in agreement with (2)

  11. Closure Report for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    Fitzmaurice, T. M.

    2001-01-01

    This closure report (CR) provides documentation for the closure of the Roller Coaster RADSAFE Area (RCRSA) Corrective Action Unit (CAU) 407 identified in the Federal Facility Agreement and Consent Order (FFACO) (Nevada Division of Environmental Protection [NDEP] et al., 1996). CAU 407 is located at the Tonopah Test Range (TTR), Nevada. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The RCRSA is located on the northeast comer of the intersection of Main Road and Browne's Lake Road, which is approximately 8 km (5 mi) south of Area 3 (Figure 1). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Double Tracks and Clean Slate tests. Investigation of the RCRSA was conducted from June through November of 1998. A Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOEN], 1999) was approved in October of 1999. The purpose of this CR is to: Document the closure activities as proposed in the Corrective Action Plan (CAP) (DOEM, 2000). Obtain a Notice of Completion from the NDEP. Recommend the movement of CAU 407 from Appendix III to Appendix IV of the FFACO. The following is the scope of the closure actions implemented for CAU 407: Removal and disposal of surface soils which were over three times background for the area. Soils identified for removal were disposed of at the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS). Excavated areas were backfilled with clean borrow soil located near the site. A soil cover was constructed over the waste disposal pit area, where subsurface constituents of concern remain. The site was fenced and posted as an ''Underground Radioactive Material'' area

  12. Sustained long-term benefit of patent foramen ovale closure on migraine.

    Science.gov (United States)

    Trabattoni, Daniela; Fabbiocchi, Franco; Montorsi, Piero; Galli, Stefano; Teruzzi, Giovanni; Grancini, Luca; Gatto, Pamela; Bartorelli, Antonio L

    2011-03-01

    This single-center, observational, prospective study evaluated the impact of patent foramen ovale (PFO) closure on migraine attacks over time. PFO closure may reduce the frequency and severity of migraine headaches in patients with significant right-to-left shunts. Between May 2000 and September 2009, 305 consecutive patients (mean age, 43 ± 12 years; 54.5% women) with a prior embolic cerebrovascular event underwent PFO closure with the Amplatzer PFO occluder for recurrence prevention. All patients had right-to-left shunts; the shunts were associated with migraine symptoms in 77 (25%), either alone (n = 64, 83%) or with aura (n = 13, 17%). Septal aneurysm was present in 15 (19.5%) migraine patients, and 43 (56%) had a previous transient brain ischemic attack. All migraine patients had a computed tomography scan or magnetic resonance imaging, indicating a previous brain ischemic lesion. All 305 patients underwent transthoracic echocardiography with clinical follow-up at 24 hr, at 3, 6, and 12 months, and then yearly. An acute migraine attack occurred 24-48 hr after PFO closure in 28 (36.4%) of 77 patients. There was a significant reduction (>50%) in the number and intensity of attacks in 46 (60.5%) of 77 patients at the 3-month follow-up. At the 12-month follow-up, migraine had ceased in 23 (46%) patients, and 20 (40%) had a reduction in the migraine recurrence rate and disabling symptoms. These results were maintained at follow-up (mean, 28 ± 27 months). There was overall improvement in migraine in 89% of the treated patients. Percutaneous PFO closure in migraineurs may provide beneficial mid-term and long-term results, with significant reduction in the intensity and frequency of headache symptoms. Copyright © 2010 Wiley-Liss, Inc.

  13. Percutaneous closure of patent foramen ovale in patients with presumed paradoxical embolism: periprocedural results and midterm risk of recurrent neurologic events.

    Science.gov (United States)

    Balbi, Manrico; Casalino, Laura; Gnecco, Giovanni; Bezante, Gian Paolo; Pongiglione, Giacomo; Marasini, Maurizio; Del Sette, Massimo; Barsotti, Antonio

    2008-08-01

    To report our data on selected patients with previous paradoxical embolism who underwent transcatheter patent foramen ovale (PFO) closure. Between July 2001 and July 2007, percutaneous PFO closure was performed on 128 patients (65 women, mean age: 46 +/- 12.8 years). Patent foramen ovale closure was recommended for secondary prevention in patients with previous transient ischemic attacks (52.5%), stroke (46%), or peripheral embolism (1.5%). Implantation was successful in all patients, and at the end of intervention, complete PFO closure was achieved in 70.3% of them. There were no "major" complications (ie, deaths, device embolization or thrombosis, need for cardiac surgery). The overall incidence of complications (mostly hemorrhagic) was 7%. The mean follow-up period was 32 months. Complete closure had been achieved in 78.4% and in 82.5% of patients at the third month of transesophageal echocardiography examination and at the sixth month of transcranial Doppler examination, respectively. There were no recurrent thromboembolic events during the follow-up period. Percutaneous closure of PFO is a feasible procedure, but it is not a risk-free technique. However, in correctly selected patients (ie, large PFO and those at risk for neurologic relapse), nearly complete PFO closure seems to provide protection from future neurologic ischaemic events at midterm follow-up.

  14. Linaclotide: first global approval.

    Science.gov (United States)

    McWilliams, Vanessa; Whiteside, Glenn; McKeage, Kate

    2012-11-12

    Linaclotide is a once-daily, orally administered, first-in-class agonist of guanylate cyclase-C that is minimally absorbed. It is being developed to treat gastrointestinal disorders by Ironwood Pharmaceuticals and its partners, Forest Laboratories (North America), Almirall (Europe) and Astellas Pharma (Asia-Pacific). Linaclotide has received its first global approval in the US for the treatment of constipation-predominant irritable bowel syndrome (IBS-C) and chronic idiopathic constipation (CIC), and a marketing submission has been filed in the EU for IBS-C. This article summarizes the milestones in the development of linaclotide leading to this first approval for IBS-C and CIC. This profile has been extracted and modified from the Adis R&D Insight drug pipeline database. Adis R&D Insight tracks drug development worldwide through the entire development process, from discovery, through pre-clinical and clinical studies to market launch.

  15. Avelumab: First Global Approval.

    Science.gov (United States)

    Kim, Esther S

    2017-05-01

    Avelumab (Bavencio ® ) is an intravenously administered programmed cell death ligand-1-blocking human antibody initially developed by EMD Serono Inc. (the biopharmaceutical division of Merck KGaA, Darmstadt, Germany) [now jointly developed and commercialized by EMD Serono Inc. and Pfizer] for the treatment of various tumours. It has received accelerated approval in the USA for the treatment of metastatic Merkel cell carcinoma (mMCC) in adults and paediatric patients aged ≥12 years. The marketing authorization application for avelumab in the treatment of mMCC is undergoing regulatory review in the EU, the biologics license application for avelumab in the treatment of urothelial carcinoma is undergoing priority review by the FDA, and avelumab is in various stages of development internationally for a variety of cancers. This article summarizes the milestones in the development of avelumab leading to this first approval for mMCC.

  16. Evaluation of the Momentum Closure Schemes in MPAS-Ocean

    Science.gov (United States)

    Zhao, Shimei; Liu, Yudi; Liu, Wei

    2018-04-01

    In order to compare and evaluate the performances of the Laplacian viscosity closure, the biharmonic viscosity closure, and the Leith closure momentum schemes in the MPAS-Ocean model, a variety of physical quantities, such as the relative reference potential energy (RPE) change, the RPE time change rate (RPETCR), the grid Reynolds number, the root mean square (RMS) of kinetic energy, and the spectra of kinetic energy and enstrophy, are calculated on the basis of results of a 3D baroclinic periodic channel. Results indicate that: 1) The RPETCR demonstrates a saturation phenomenon in baroclinic eddy tests. The critical grid Reynolds number corresponding to RPETCR saturation differs between the three closures: the largest value is in the biharmonic viscosity closure, followed by that in the Laplacian viscosity closure, and that in the Leith closure is the smallest. 2) All three closures can effectively suppress spurious dianeutral mixing by reducing the grid Reynolds number under sub-saturation conditions of the RPETCR, but they can also damage certain physical processes. Generally, the damage to the rotation process is greater than that to the advection process. 3) The dissipation in the biharmonic viscosity closure is strongly dependent on scales. Most dissipation concentrates on small scales, and the energy of small-scale eddies is often transferred to large-scale kinetic energy. The viscous dissipation in the Laplacian viscosity closure is the strongest on various scales, followed by that in the Leith closure. Note that part of the small-scale kinetic energy is also transferred to large-scale kinetic energy in the Leith closure. 4) The characteristic length scale L and the dimensionless parameter D in the Leith closure are inherently coupled. The RPETCR is inversely proportional to the product of D and L. When the product of D and L is constant, both the simulated RPETCR and the inhibition of spurious dianeutral mixing are the same in all tests using the Leith

  17. A virtual crack-closure technique for calculating stress intensity factors for cracked three dimensional bodies

    Science.gov (United States)

    Shivakumar, K. N.; Tan, P. W.; Newman, J. C., Jr.

    1988-01-01

    A three-dimensional virtual crack-closure technique is presented which calculates the strain energy release rates and the stress intensity factors using only nodal forces and displacements from a standard finite element analysis. The technique is an extension of the Rybicki-Kanninen (1977) method, and it assumes that any continuous function can be approximated by a finite number of straight line segments. Results obtained by the method for surface cracked plates with and without notches agree favorably with previous results.

  18. PROTOCOL FOR EXAMINATION OF THE INNER CAN CLOSURE WELD REGION FOR 3013 DE CONTAINERS

    Energy Technology Data Exchange (ETDEWEB)

    Mickalonis, J.

    2014-09-16

    The protocol for the examination of the inner can closure weld region (ICCWR) for 3013 DE containers is presented within this report. The protocol includes sectioning of the inner can lid section, documenting the surface condition, measuring corrosion parameters, and storing of samples. This protocol may change as the investigation develops since findings may necessitate additional steps be taken. Details of the previous analyses, which formed the basis for this protocol, are also presented.

  19. Femoral Artery Stenosis Following Percutaneous Closure Using a Starclose Closure Device

    International Nuclear Information System (INIS)

    Bent, Clare Louise; Kyriakides, Constantinos; Matson, Matthew

    2008-01-01

    Starclose (Abbott Vascular Devices, Redwood City, CA) is a new arterial closure device that seals a femoral puncture site with an extravascular star-shaped nitinol clip. The clip projects small tines into the arterial wall which fold inward, causing the arterial wall to pucker, producing a purse-string-like seal closing the puncture site. The case history is that of a 76-year-old female patient who underwent day-case percutaneous diagnostic coronary angiography. A Starclose femoral artery closure device was used to achieve hemostasis with subsequent femoral artery stenosis.

  20. Preoperative screening: value of previous tests.

    Science.gov (United States)

    Macpherson, D S; Snow, R; Lofgren, R P

    1990-12-15

    To determine the frequency of tests done in the year before elective surgery that might substitute for preoperative screening tests and to determine the frequency of test results that change from a normal value to a value likely to alter perioperative management. Retrospective cohort analysis of computerized laboratory data (complete blood count, sodium, potassium, and creatinine levels, prothrombin time, and partial thromboplastin time). Urban tertiary care Veterans Affairs Hospital. Consecutive sample of 1109 patients who had elective surgery in 1988. At admission, 7549 preoperative tests were done, 47% of which duplicated tests performed in the previous year. Of 3096 previous results that were normal as defined by hospital reference range and done closest to the time of but before admission (median interval, 2 months), 13 (0.4%; 95% CI, 0.2% to 0.7%), repeat values were outside a range considered acceptable for surgery. Most of the abnormalities were predictable from the patient's history, and most were not noted in the medical record. Of 461 previous tests that were abnormal, 78 (17%; CI, 13% to 20%) repeat values at admission were outside a range considered acceptable for surgery (P less than 0.001, frequency of clinically important abnormalities of patients with normal previous results with those with abnormal previous results). Physicians evaluating patients preoperatively could safely substitute the previous test results analyzed in this study for preoperative screening tests if the previous tests are normal and no obvious indication for retesting is present.

  1. Comments to Middle Miocene closure of the Central American Seaway

    Science.gov (United States)

    Coates, A.G.; Stallard, Robert F.

    2016-01-01

    In a recent paper proposing an early (mid-Miocene) closure of the Central American Seaway (CAS), Montes et al. 2015 (1) disregard existing paleogeographic data that invalidate Panama as a source for zircons, and inappropriately ignore the evidence for trans-isthmian marine connections until 4-3 Ma. They also fail to cite previous work (2, 3), that had reconstructed the Central American arc already docked with South America by 12 Ma. Montes et al. 2015 (1) (Fig. 1) disregard the Atrato-San Juan sedimentary basin (3), a shallowing Oligocene to Pliocene, Pacific to Caribbean seaway (3, 4, 5). This deep graben (6) is filled with thousands of meters of Pre-Pliocene marine sediments (3, 5, 6) that now occupy a lowland between the Baudo uplift to the west and the Western Cordillera to the east. The Mande Batholith and numerous Eocene and younger volcanic rocks (4), the most proximal source of the zircons, are situated to the east of this seaway and would have shed zircons eastward towards the Cordillera Central. There is no evidence for any rivers crossing the seaway (3, 5), and thus no Panamanian source of zircons. Instead this seaway is evidence of a significant marine connection between the Pacific and Atlantic oceans into the Pliocene. The authors assume that the middle Miocene closure of the CAS effectively creates a continuous land bridge connecting North and South America and separating the Atlantic from the Pacific. They acknowledge, but then discount, marine connections across the Isthmus until 4-3 Ma even though these satisfactorily explain (Coates and Stallard, 2014 (6)) the oceanographic, molecular and Great American Biological Interchange events ignore unexplained by Montes et al. 2015. Only by conspicuously ignoring these events can they imply that the Isthmus was formed at 15-13 Ma. References 1. C. Montes et al., Middle Miocene closure of the Central American Seaway. Science 348, 226-229 (2015). 2. A. G. Coates, R. F. Stallard, How old is the Isthmus of

  2. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references

  3. Magnetisable container closure and means for its removal

    International Nuclear Information System (INIS)

    Barrett, W.I.

    1984-01-01

    A container has a closed lower end and an open upper end, is made of a non-magnetic material such as aluminium, and has a peripheral groove spaced from the open end. A disc-like closure is of magnetic material such as ferritic steel, has a pair of spring jaws joined to the disc by a joining member such that when the disc of the closure is in position closing the open end of the container, the jaws engage in groove and hold the closure in position. To remove the closure, it is engaged by magnetic means mounted for example on a wall and having a step such that when the container is moved laterally away the closure is retained by the magnetic means aided by the step and thereby the closure becomes removed from the container. (author)

  4. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.

  5. Transient severe left ventricular dysfunction following percutaneous patent ductus arteriosus closure in an adult with bicuspid aortic valve: A case report

    OpenAIRE

    HWANG, HUI-JEONG; YOON, KYUNG LIM; SOHN, IL SUK

    2016-01-01

    The present study reported the case of a 60-year-old female with patent ductus arteriosus (PDA) and a bicuspid aortic valve, who presented with transient severe left ventricular (LV) dysfunction following percutaneous closure of PDA, as identified by speckle tracking analysis. Transient LV dysfunction following PDA closure has previously been reported; however, severe LV dysfunction is rare. In the present case, the combination of a large PDA size, large amount of shunting, LV remodeling and ...

  6. HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

    International Nuclear Information System (INIS)

    Jolly, R; Bruce Martin, B

    2008-01-01

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intraarea

  7. HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jolly, R; Bruce Martin, B

    2008-01-15

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple

  8. Automatic electromagnetic valve for previous vacuum

    International Nuclear Information System (INIS)

    Granados, C. E.; Martin, F.

    1959-01-01

    A valve which permits the maintenance of an installation vacuum when electric current fails is described. It also lets the air in the previous vacuum bomb to prevent the oil ascending in the vacuum tubes. (Author)

  9. Post-closure performance assessment treatment of the biosphere

    Energy Technology Data Exchange (ETDEWEB)

    Broderick, M A [UK Nirex Ltd., Harwell, Oxfordshire (United Kingdom); Egan, M J [AEA Technology, Risley, Cheshire (United Kingdom); Thorne, M C [Electrowatt, Horsham, Sussex (United Kingdom); Williams, J A [AEA Technology, Risley, Cheshire (United Kingdom)

    1996-07-01

    The Nirex strategy for radioactive waste disposal is based on a system of engineered and natural barriers, providing long-term isolation of the waste from those parts of the environment that are in contact with or readily available for use by humans (i.e. the biosphere). Even so, there remains the possibility that, on a timescale of thousands to tens of thousands of years, small quantities of poorly-sorbed, long-lived radionuclides may be released from the engineered disposal system, ultimately to emerge into the biosphere. Biosphere models are used in post-closure performance assessments to quantify the competing effects of dilution and accumulation processes on radionuclide concentrations in the accessible environment. Understanding biosphere processes and their time dependence is necessary not only to determine the radiological impact of possible future releases, but also to characterise the dynamics of transport in groundwater and the location, duration and extent of any such releases. Nirex is developing a new biosphere model for use in post-closure radiological assessments for the proposed Sellafield repository. A compartment modelling approach has been adopted, as in studies performed previously, but the system will be dynamic, allowing changes with time in both the properties of compartments and the transfers between compartments. The transport model considers both mass transport within the biosphere and the migration of radionuclides, thereby ensuring that a self-consistent description of the biosphere, in a spatially-extensive domain is maintained. The above approach is designed to link the assessment models used by the Nirex assessment team more closely into the Nirex biosphere research programme than has hitherto been possible with time-invariant assessment models. (author)

  10. Post-closure performance assessment treatment of the biosphere

    International Nuclear Information System (INIS)

    Broderick, M.A.; Egan, M.J.; Thorne, M.C.; Williams, J.A.

    1996-01-01

    The Nirex strategy for radioactive waste disposal is based on a system of engineered and natural barriers, providing long-term isolation of the waste from those parts of the environment that are in contact with or readily available for use by humans (i.e. the biosphere). Even so, there remains the possibility that, on a timescale of thousands to tens of thousands of years, small quantities of poorly-sorbed, long-lived radionuclides may be released from the engineered disposal system, ultimately to emerge into the biosphere. Biosphere models are used in post-closure performance assessments to quantify the competing effects of dilution and accumulation processes on radionuclide concentrations in the accessible environment. Understanding biosphere processes and their time dependence is necessary not only to determine the radiological impact of possible future releases, but also to characterise the dynamics of transport in groundwater and the location, duration and extent of any such releases. Nirex is developing a new biosphere model for use in post-closure radiological assessments for the proposed Sellafield repository. A compartment modelling approach has been adopted, as in studies performed previously, but the system will be dynamic, allowing changes with time in both the properties of compartments and the transfers between compartments. The transport model considers both mass transport within the biosphere and the migration of radionuclides, thereby ensuring that a self-consistent description of the biosphere, in a spatially-extensive domain is maintained. The above approach is designed to link the assessment models used by the Nirex assessment team more closely into the Nirex biosphere research programme than has hitherto been possible with time-invariant assessment models. (author)

  11. Vacuum assisted closure in vascular surgery.

    Science.gov (United States)

    Beno, M; Martin, J; Sager, P

    2011-01-01

    Vacuum assisted closure (VAC-therapy) is a well established method in nearly all surgical disciplines. The aim is to present the efficiency of vacuum assisted closure in the treatment of acute and chronic wounds in patients admitted in the department of vascular surgery. Within the year 2008 there were 59 patients (44 men, 15 women) treated with VAC therapy in our Department of Vascular surgery (Landshut, Germany). VAC was used 22x (37.28 %) in therapy of ulcus cruris (venous, arterial, mixed genesis), 15x (25.42%) in patients with diabetic foot syndrome, 12x (20.33%) in secondary healing wounds and infected wounds, 5x (8.47%) in wounds after several injuries and soft skin tissue infections and 5x (8.47%) in wound infections connected with vascular graft infections after vascular revascularization. VAC therapy seems to be very effective in the management of patients with venous ulcers, especially after a proper surgical treatment (100%), patients with soft skin tissue infections (100%) and secondary healing wounds (100%) especially in combination with MESH-Grafting. In patients with diabetic foot syndrome (80%) and peripheral arterial occlusive disease (72.7%), an evaluation of peripheral blood perfusion and revascularization prior to VAC therapy is often necessary. Although VAC was used 5x in the therapy of infected vascular grafts, successful preservation of infected graft material was observed in only one case (infection of PTFE femoro-popliteal bypass graft). Vacuum assisted closure in vascular surgery proved to be simple and efficient method in therapy of acute and chronic wounds. The efficiency of VAC systems in therapy of infected graft material after revascularization needs further studies (Tab. 3, Ref. 10).

  12. Economic and financial aspects of mine closure

    International Nuclear Information System (INIS)

    Kahn, James R.; Franceschi, Dina; Curi, Adilson; Vale, Eduardo

    2001-01-01

    Today, mine reclamation is a key component to a successful mine plan. Most of the industrialized nations have recognized the need to make mining activities relatively environmentally friendly, if they want to continue to benefit from the economic gains from mineral resource development. Countries such as the United States, Canada, Australia and South Africa are leaders in the field and have implemented relatively sophisticated legislation to ensure environmentally correct mine closure. These countries rely on a combination of strict control strategies and economic penalties to ensure compliance. Yet, from the firm's perspective, reclamation activities are counterproductive as they cut into properties. In order to attract economic development and earn much needed economic capital, most of the rest of the world, particularly the developing countries, lack effective mine closure legislation. The traditional command and control type of legislation that is sometimes used is either vague and therefore avoided, or not enforced appropriately, resulting in an undesirable level of environmental degradation. With the use of case studies from Brazil, this article shows that direct controls are effective in some instances and not in others. It proposes that economic and financial tools may be more effective than the traditional direct controls in getting firms to comply with environmental standards, particularly in developing countries where environmental compliance is more difficult to achieve. It explains the use of performance bonding as one type of economic incentive that has proven to be an effective environmental policy in mine planning and closure. The authors additionally push beyond the typical style of performance bonds to introduce a flexible bonding and insurance system that allows governments to maintain strict environmental standards but limits firms financial exposure during the mining process. Such a system learns from the successes of the industrialized

  13. Derivation of a thermodynamic closure relation in the isothermal-isobaric ensemble using quasi-Gaussian entropy theory

    NARCIS (Netherlands)

    Apol, M.E F; Amadei, A; Berendsen, H.J.C.

    1996-01-01

    In an analogous way as was done previously in the canonical ensemble, we derived for dilute gases an approximated thermodynamic closure relation in the isothermal-isobaric ensemble using quasi-Gaussian entropy theory. For the Gamma state, we formulated equations for the temperature dependence of

  14. Premature closure of the Trojan Nuclear Plant

    International Nuclear Information System (INIS)

    Kononetz, B.P.

    1995-01-01

    The premature closure of the Trojan Nuclear Plant is discussed in outline form. The topics discussed include: an overview of Trojan; events leading to shutdown decision; Trojan's lifetime O ampersand M performance; Trojan's Regulatory performance; historical Trojan regulatory versus economic performance; applicable Oregon law; least-cost planning process; 1992 least cost plan; 1993 LCP update; LCP limitations; comparative performance analysis; management assessments; Trojan O ampersand M analysis; steam generator issues; quantification of deficiencies; quantification of impact of steam generator degradation; 'net benefits' test; conclusions from net benefits analysis; total disallowances; and conclusions and ramifications

  15. 100-N Area underground storage tank closures

    Energy Technology Data Exchange (ETDEWEB)

    Rowley, C.A.

    1993-08-01

    This report describes the removal/characterization actions concerning underground storage tanks (UST) at the 100-N Area. Included are 105-N-LFT, 182-N-1-DT, 182-N-2-DT, 182-N-3-DT, 100-N-SS-27, and 100-N-SS-28. The text of this report gives a summary of remedial activities. In addition, correspondence relating to UST closures can be found in Appendix B. Appendix C contains copies of Unusual Occurrence Reports, and validated sampling data results comprise Appendix D.

  16. Discursive Closure and Discursive Openings in Sustainability

    DEFF Research Database (Denmark)

    Christensen, Lars Thøger; Morsing, Mette; Thyssen, Ole

    2015-01-01

    and explore new ideas and practices. Accepting conceptual ambiguity, in other words, is not necessarily to evade responsibility or critique. Whereas discursive closure may bind the concept to the past and make an organization blind to new and unexpected issues of sustainability problems, an open......Sustainability is an ambiguous and open-ended concept with many different meanings. Researchers as well as practitioners often express frustration with this fact and frequently call for more consistent, measurable, and univocal definitions of sustainability to ensure agreement, mutual understanding...

  17. Multiple coil closure of isolated aortopulmonary collateral

    Directory of Open Access Journals (Sweden)

    Padhi Sumanta

    2010-01-01

    Full Text Available A 7-month-old girl was diagnosed to have large aortopulmonary collateral during evaluation for congestive heart failure. There was no other evidence of cardiopulmonary disease. The collateral was successfully closed with multiple coils delivered sequentially. We describe the issues associated during closure of the aortopulmonary collateral in this case. To the best of our knowledge, this is the first reported case of large aortopulmonary collateral presenting with heart failure in an otherwise structurally normal heart that was closed successfully with multiple coils delivered sequentially.

  18. 100-N Area underground storage tank closures

    International Nuclear Information System (INIS)

    Rowley, C.A.

    1993-01-01

    This report describes the removal/characterization actions concerning underground storage tanks (UST) at the 100-N Area. Included are 105-N-LFT, 182-N-1-DT, 182-N-2-DT, 182-N-3-DT, 100-N-SS-27, and 100-N-SS-28. The text of this report gives a summary of remedial activities. In addition, correspondence relating to UST closures can be found in Appendix B. Appendix C contains copies of Unusual Occurrence Reports, and validated sampling data results comprise Appendix D

  19. Mixed Waste Management Facility closure at the Savannah River Site

    International Nuclear Information System (INIS)

    Bittner, M.F.

    1991-08-01

    The Mixed Waste Management Facility of the Savannah River Plant received hazardous and solid low level radioactive wastes from 1972 until 1986. Because this facility did not have a permit to receive hazardous wastes, a Resource Conservation and Recovery Act closure was performed between 1987 and 1990. This closure consisted of dynamic compaction of the waste trenches and placement of a 3-foot clay cap, a 2-foot soil cover, and a vegetative layer. Operations of the waste disposal facility, tests performed to complete the closure design, and the construction of the closure cap are discussed herein

  20. Top closure for control rod drive for nuclear reactor

    International Nuclear Information System (INIS)

    Raas, J.H.; Schwartz, J.I.

    1978-01-01

    A removable top closure and venting assembly for the tubular housing of a control rod drive includes a mounting ring threadably inserted in the upper end of the housing, a fluid-sealing closure member beneath the mounting ring and which is mounted in and coupled to the mounting ring by means of a ball and socket joint, a gas vent defined by interconnecting passages extending through the closure and through the ball and socket joint, and a vent valve accessible from the top of the closure assembly. 3 claims, 2 figures

  1. Design and analysis of PCRV core cavity closure

    International Nuclear Information System (INIS)

    Lee, T.T.; Schwartz, A.A.; Koopman, D.C.A.

    1980-05-01

    Design requirements and considerations for a core cavity closure which led to the choice of a concrete closure with a toggle hold-down as the design for the Gas-Cooled Fast Breeder Reactor (GCFR) plant are discussed. A procedure for preliminary stress analysis of the closure by means of a three-dimensional finite element method is described. A limited parametric study using this procedure indicates the adequacy of the present closure design and the significance of radial compression developed as a result of inclined support reaction

  2. Transcatheter Closure of Patent Foramen Ovale: Devices and Technique.

    Science.gov (United States)

    Price, Matthew J

    2017-10-01

    Transcatheter closure of a patent foramen ovale (PFO) reduces the risk of recurrent cryptogenic stroke compared with medical therapy. PFO closure is a prophylactic procedure, and will not provide the patient with symptomatic improvement, except in cases of hypoxemia due to right-to-left shunt or possibly migraine headaches. Therefore, appropriate patient selection is critical, and procedural safety is paramount. Herein, we review key characteristics of the devices currently available for transcatheter PFO closure within the United States, and highlight key technical aspects of the PFO closure procedure that will maximize procedural success. Copyright © 2017 Elsevier Inc. All rights reserved.

  3. Simulating school closure policies for cost effective pandemic decision making

    Directory of Open Access Journals (Sweden)

    Araz Ozgur M

    2012-06-01

    Full Text Available Abstract Background Around the globe, school closures were used sporadically to mitigate the 2009 H1N1 influenza pandemic. However, such closures can detrimentally impact economic and social life. Methods Here, we couple a decision analytic approach with a mathematical model of influenza transmission to estimate the impact of school closures in terms of epidemiological and cost effectiveness. Our method assumes that the transmissibility and the severity of the disease are uncertain, and evaluates several closure and reopening strategies that cover a range of thresholds in school-aged prevalence (SAP and closure durations. Results Assuming a willingness to pay per quality adjusted life-year (QALY threshold equal to the US per capita GDP ($46,000, we found that the cost effectiveness of these strategies is highly dependent on the severity and on a willingness to pay per QALY. For severe pandemics, the preferred strategy couples the earliest closure trigger (0.5% SAP with the longest duration closure (24 weeks considered. For milder pandemics, the preferred strategies also involve the earliest closure trigger, but are shorter duration (12 weeks for low transmission rates and variable length for high transmission rates. Conclusions These findings highlight the importance of obtaining early estimates of pandemic severity and provide guidance to public health decision-makers for effectively tailoring school closures strategies in response to a newly emergent influenza pandemic.

  4. The potential migration effect of rural hospital closures

    DEFF Research Database (Denmark)

    Sørensen, Jens Fyhn Lykke

    2008-01-01

    to out-migration, although the hypothetical way of questioning leaves uncertainty about the actual scale of out-migration. Child families appear to be the most likely out-migrants. Elderly people may be hardest hit by a hospital closure, being most reliant on health care and least inclined to move away.......Rural hospital closures are high on the current health care agenda in Denmark. One raised concern is that rural hospital closures may further decrease population numbers in rural areas, as closures may induce some residents to move away from affected areas, i.e. closer to health care services...

  5. U.S. Small Business HUBZone Base Closure Areas

    Data.gov (United States)

    Small Business Administration — HUBZone Qualitified Base Closure Areas - the lands within the boundaries of a military installation that was closed through a privatization process under the Federal...

  6. Digital signal processing of data from borehole creep closure

    International Nuclear Information System (INIS)

    Chakrabarti, S.; Patrick, W.C.; Duplancic, N.

    1987-01-01

    Digital signal processing, a technique commonly used in the fields of electrical engineering and communication technology, has been successfully used to analyze creep closure data obtained from a 0.91 m diameter by 5.13 deep borehole in bedded salt. By filtering the ''noise'' component of the closure data from a test borehole, important data trends were made more evident and average creep closure rates were able to be calculated. This process provided accurate estimates of closure rates that are used in the design of lined boreholes in which heat-generating transuranic nuclear wastes are emplaced at the Waste Isolation Pilot Plant

  7. Transcatheter closure of patent ductus arteriosus: past, present and future.

    Science.gov (United States)

    Baruteau, Alban-Elouen; Hascoët, Sébastien; Baruteau, Julien; Boudjemline, Younes; Lambert, Virginie; Angel, Claude-Yves; Belli, Emre; Petit, Jérôme; Pass, Robert

    2014-02-01

    This review aims to describe the past history, present techniques and future directions in transcatheter treatment of patent ductus arteriosus (PDA). Transcatheter PDA closure is the standard of care in most cases and PDA closure is indicated in any patient with signs of left ventricular volume overload due to a ductus. In cases of left-to-right PDA with severe pulmonary arterial hypertension, closure may be performed under specific conditions. The management of clinically silent or very tiny PDAs remains highly controversial. Techniques have evolved and the transcatheter approach to PDA closure is now feasible and safe with current devices. Coils and the Amplatzer Duct Occluder are used most frequently for PDA closure worldwide, with a high occlusion rate and few complications. Transcatheter PDA closure in preterm or low-bodyweight infants remains a highly challenging procedure and further device and catheter design development is indicated before transcatheter closure is the treatment of choice in this delicate patient population. The evolution of transcatheter PDA closure from just 40 years ago with 18F sheaths to device delivery via a 3F sheath is remarkable and it is anticipated that further improvements will result in better safety and efficacy of transcatheter PDA closure techniques. Copyright © 2014 Elsevier Masson SAS. All rights reserved.

  8. Interim status of closure/post-closure plan for 183-H solar evaporation basins

    International Nuclear Information System (INIS)

    1988-03-01

    This report describes a plan for decommissioning several solar evaporation basins on the Hanford reservation. The document describes procedures for sampling during decommissioning and a plan for certification of the resulting completed landfill. Additional plans deal with the training, security of the site, and post-closure monitoring

  9. Military Base Closures: Updated Status of Prior Base Realignments and Closures

    Science.gov (United States)

    As the Department of Defense (DOD) prepares for the 2005 base realignment and closure (BRAC) round, questions continue to be raised about the transfer and environmental cleanup of unneeded property arising from the prior four BRAC rounds and their impact on cost and savings and on local economies.

  10. Closure Report for Corrective Action Unit 271: Areas 25, 26, and 27 Septic Systems, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2004-08-01

    The purpose of this CR is to document that closure activities have met the approved closure standards detailed in the NDEP-approved CAP for CAU 271. The purpose of the Errata Sheet is as follows: In Appendix G, Use Restriction (UR) Documentation, the UR form and drawing of the UR area do not reflect the correct coordinates. Since the original UR was put into place, the UR Form has been updated to include additional information that was not on the original form. This Errata Sheet replaces the original UR Form and drawing. In place of the drawing of the UR area, an aerial photograph is included which reflects the UR area and the correct coordinates for the UR area.

  11. Closure Report for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2003-03-01

    Corrective Action Unit (CAU) 425 is located on the Tonopah Test Range, approximately 386 kilometers (240 miles) northwest of Las Vegas, Nevada. CAU 425 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and is comprised of one Corrective Action Site (CAS). CAS 09-08-001-TA09 consisted of a large pile of concrete rubble from the original Hard Target and construction debris associated with the Tornado Rocket Sled Tests. CAU 425 was closed in accordance with the FFACO and the Nevada Division of Environmental Protection-approved Streamlined Approach for Environmental Restoration Plan for CAU 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada (U.S. Department of Energy, Nevada Operations Office, 2002). CAU 425 was closed by implementing the following corrective actions: The approved corrective action for this unit was clean closure. Closure activities included: (1) Removal of all the debris from the site. (2) Weighing each load of debris leaving the job site. (3) Transporting the debris to the U.S. Air Force Construction Landfill for disposal. (4) Placing the radioactive material in a U.S. Department of Transportation approved container for proper transport and disposal. (5) Transporting the radioactive material to the Nevada Test Site for disposal. (6) Regrading the job site to its approximate original contours/elevation.

  12. Role of vision in aperture closure control during reach-to-grasp movements.

    Science.gov (United States)

    Rand, Miya K; Lemay, Martin; Squire, Linda M; Shimansky, Yury P; Stelmach, George E

    2007-08-01

    We have previously shown that the distance from the hand to the target at which finger closure is initiated during the reach (aperture closure distance) depends on the amplitude of peak aperture, as well as hand velocity and acceleration. This dependence suggests the existence of a control law according to which a decision to initiate finger closure during the reach is made when the hand distance to target crosses a threshold that is a function of the above movement-related parameters. The present study examined whether the control law is affected by manipulating the visibility of the hand and the target. Young adults made reach-to-grasp movements to a dowel under conditions in which the target or the hand or both were either visible or not visible. Reaching for and grasping a target when the hand and/or target were not visible significantly increased transport time and widened peak aperture. Aperture closure distance was significantly lengthened and wrist peak velocity was decreased only when the target was not visible. Further analysis showed that the control law was significantly different between the visibility-related conditions. When either the hand or target was not visible, the aperture closure distance systematically increased compared to its value for the same amplitude of peak aperture, hand velocity, and acceleration under full visibility. This implies an increase in the distance-related safety margin for grasping when the hand or target is not visible. It has been also found that the same control law can be applied to all conditions, if variables describing hand and target visibility were included in the control law model, as the parameters of the task-related environmental context, in addition to the above movement-related parameters. This suggests that that the CNS utilizes those variables for controlling grasp initiation based on a general control law.

  13. Retrospective analysis of a VACM (vacuum-assisted closure and mesh-mediated fascial traction treatment manual for temporary abdominal wall closure – results of 58 consecutive patients

    Directory of Open Access Journals (Sweden)

    Beltzer, Christian

    2016-07-01

    Full Text Available Introduction: The optimal treatment concept for temporary abdominal closure (TAC in critically ill visceral surgery patients with open abdomen (OA continues to be unclear. The VACM (vacuum-assisted closure and mesh-mediated fascial traction therapy seems to permit higher delayed primary fascial closure rates (FCR than other TAC procedures. Material and methods: Patients of our clinic (n=58 who were treated by application of a VAC/VACM treatment manual in the period from 2005 to 2008 were retrospectively analysed. Results: The overall FCR of all patients was 48.3% (95% confidence interval: 34.95–61.78. An FCR of 61.3% was achieved in patients who had a vicryl mesh implanted at the fascial level (VACM therapy in the course of treatment. Mortality among patients treated with VACM therapy was 45.2% (95% CI: 27.32–63.97.Conclusions: The results of our own study confirm the results of previous studies which showed an acceptable FCR among non-trauma patients who were treated with VACM therapy. VACM therapy currently appears to be the treatment regime of choice for patients with OA requiring TAC.

  14. Deployment of an Alternative Closure Cover and Monitoring System at the Mixed Waste Disposal Unit U-3ax/bl at the Nevada Test Site

    International Nuclear Information System (INIS)

    Levitt, D.G.; Fitzmaurice, T.M.

    2001-01-01

    In October 2000, final closure was initiated of U-3ax/bl, a mixed waste disposal unit at the Nevada Test Site (NTS). The application of approximately 30 cm of topsoil, composed of compacted native alluvium onto an operational cover, seeding of the topsoil, installation of soil water content sensors within the cover, and deployment of a drainage lysimeter facility immediately adjacent to the disposal unit initiated closure. This closure is unique in that it required the involvement of several U.S. Department of Energy (DOE) Environmental Management (EM) groups: Waste Management (WM), Environmental Restoration (ER), and Technology Development (TD). Initial site characterization of the disposal unit was conducted by WM. Regulatory approval for closure of the disposal unit was obtained by ER, closure of the disposal unit was conducted by ER, and deployment of the drainage lysimeter facility was conducted by WM and ER, with funding provided by the Accelerated Site Technology Deployment ( ASTD) program, administered under TD. In addition, this closure is unique in that a monolayer closure cover, also known as an evapotranspiration (ET) cover, consisting of native alluvium, received regulatory approval instead of a traditional Resource Conservation and Recovery Act (RCRA) multi-layered cover. Recent studies indicate that in the arid southwestern United States, monolayer covers may be more effective at isolating waste than layered covers because of the tendency of clay layers to desiccate and crack, and subsequently develop preferential pathways. The lysimeter facility deployed immediately adjacent to the closure cover consists of eight drainage lysimeters with three surface treatments: two were left bare; two were revegetated with native species; two were allowed to revegetate with invader species; and two are reserved for future studies. The lysimeters are constructed such that any drainage through the bottoms of the lysimeters can be measured. Sensors installed in the

  15. Supercollider: Footprint approved

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    With the 'footprint' - the precise location of the 87-kilometre US Superconducting Supercollider, SSC, and its ancillary buildings - now approved, teams of specialists commissioned by the State of Texas swing into action to procure the 17,000 acres (69 million square metres) of land covered by the project. With the SSC Laboratory in Ellis County and the US Department of Energy (DoE, the overseeing government agency) both hiring manpower for this project to collide 20 TeV (20,000 GeV) proton beams before the end of the century, the host State of Texas is providing a helping hand

  16. 77 FR 41278 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Reasonably Available...

    Science.gov (United States)

    2012-07-13

    ... control technology (RACT) for oxides of nitrogen (NO X ) and volatile organic compounds (VOCs) for the... certification that previously adopted RACT controls in Maryland's SIP, which were approved by EPA under the 1... through (1) certification that previously adopted RACT controls in Maryland's SIP that were approved by...

  17. Patent ductus arteriosus closure using an Amplatzer™ ventricular septal defect closure device

    Science.gov (United States)

    Fernando, Rajeev; Koranne, Ketan; Loyalka, Pranav; Kar, Biswajit; Gregoric, Igor

    2013-01-01

    The ductus arteriosus originates from the persistence of the distal portion of the left sixth aortic arch. It connects the descending aorta (immediately distal to the left subclavian artery) to the roof of the main pulmonary artery, near the origin of the left pulmonary artery. Persistence of the duct beyond 48 h after birth is abnormal and results in patent ductus arteriosus (PDA). PDA is rare in adults because it is usually discovered and treated in childhood. Mechanical closure remains the definitive therapy because the patency of ductus arteriosus may lead to multiple complications, depending on the size and flow through the ductus. PDA closure is indicated in patients with symptoms and evidence of left heart enlargement, and in patients with elevated pulmonary pressures when reversal is possible. Transcatheter closure is the preferred technique in adults because it avoids sternotomy, reduces the length of hospital stay and is associated with fewer complications compared with surgery. First demonstrated in 1967, both the technique and the occluder devices used have since evolved. However, designing an ideal PDA occluder has been a challenge due to the variability in size, shape and orientation of PDAs. The present article describes a case involving a 35-year-old woman who presented to the Center for Advanced Heart Failure (Houston, USA) with congestive heart failure due to a large PDA, which was successfully occluded using an Amplatzer (St Jude Medical, USA) muscular ventricular septal defect closure device. The wider waist and dual-retention discs of these ventricular septal defect closure devices may be important factors to consider in the future development of devices for the occlusion of large PDAs. PMID:24294051

  18. Patent ductus arteriosus closure using an Amplatzer(™) ventricular septal defect closure device.

    Science.gov (United States)

    Fernando, Rajeev; Koranne, Ketan; Loyalka, Pranav; Kar, Biswajit; Gregoric, Igor

    2013-01-01

    The ductus arteriosus originates from the persistence of the distal portion of the left sixth aortic arch. It connects the descending aorta (immediately distal to the left subclavian artery) to the roof of the main pulmonary artery, near the origin of the left pulmonary artery. Persistence of the duct beyond 48 h after birth is abnormal and results in patent ductus arteriosus (PDA). PDA is rare in adults because it is usually discovered and treated in childhood. Mechanical closure remains the definitive therapy because the patency of ductus arteriosus may lead to multiple complications, depending on the size and flow through the ductus. PDA closure is indicated in patients with symptoms and evidence of left heart enlargement, and in patients with elevated pulmonary pressures when reversal is possible. Transcatheter closure is the preferred technique in adults because it avoids sternotomy, reduces the length of hospital stay and is associated with fewer complications compared with surgery. First demonstrated in 1967, both the technique and the occluder devices used have since evolved. However, designing an ideal PDA occluder has been a challenge due to the variability in size, shape and orientation of PDAs. The present article describes a case involving a 35-year-old woman who presented to the Center for Advanced Heart Failure (Houston, USA) with congestive heart failure due to a large PDA, which was successfully occluded using an Amplatzer (St Jude Medical, USA) muscular ventricular septal defect closure device. The wider waist and dual-retention discs of these ventricular septal defect closure devices may be important factors to consider in the future development of devices for the occlusion of large PDAs.

  19. A clinical investigation of force delivery systems for orthodontic space closure.

    Science.gov (United States)

    Nightingale, C; Jones, S P

    2003-09-01

    To investigate the force retention, and rates of space closure achieved by elastomeric chain and nickel titanium coil springs. Randomized clinical trial. Eastman Dental Hospital, London and Queen Mary's University Hospital, Roehampton, 1998-2000. Twenty-two orthodontic patients, wearing the pre-adjusted edgewise appliance undergoing space closure in opposing quadrants, using sliding mechanics on 0.019 x 0.025-inch posted stainless steel archwires. Medium-spaced elastomeric chain [Durachain, OrthoCare (UK) Ltd., Bradford, UK] and 9-mm nickel titanium coil springs [OrthoCare (UK) Ltd.] were placed in opposing quadrants for 15 patients. Elastomeric chain only was used in a further seven patients. The initial forces on placement and residual forces at the subsequent visit were measured with a dial push-pull gauge [Orthocare (UK) Ltd]. Study models of eight patients were taken before and after space closure, from which measurements were made to establish mean space closure. The forces were measured in grammes and space closure in millimetres. Fifty-nine per cent (31/53) of the elastomeric sample maintained at least 50 per cent of the initial force over a time period of 1-15 weeks. No sample lost all its force, and the mean loss was 47 per cent (range: 0-76 per cent). Nickel titanium coil springs lost force rapidly over 6 weeks, following that force levels plateaued. Forty-six per cent (12/26) maintained at least 50 per cent of their initial force over a time period of 1-22 weeks, and mean force loss was 48 per cent (range: 12-68 per cent). The rate of mean weekly space closure for elastomeric chain was 0.21 mm and for nickel titanium coil springs 0.26 mm. There was no relationship between the initial force applied and rate of space closure. None of the sample failed during the study period giving a 100 per cent response rate. In clinical use, the force retention of elastomeric chain was better than previously concluded. High initial forces resulted in high force decay

  20. Secondary Myelitis in Dermal Sinus Causing Paraplegia in a Child with Previously Normal Neurological Function

    Directory of Open Access Journals (Sweden)

    Sakina Rashid

    2016-01-01

    Full Text Available Neural tube defects result from failure of neural tube fusion during early embryogenesis, the fourth week after conception. The spectrum of severity is not uniform across the various forms of this congenital anomaly as certain presentations are not compatible with extrauterine life (anencephaly while, on the other hand, other defects may remain undiagnosed as they are entirely asymptomatic (occult spina bifida. We report a child with previously normal neurological development, a devastating clinical course following superinfection of a subtle spina bifida defect which resulted in a flaccid paralysis below the level of the lesion and permanent neurological deficits following resolution of the acute infection and a back closure surgery.

  1. SRS tank closure. Innovative technology summary report

    International Nuclear Information System (INIS)

    1999-08-01

    High-level waste (HLW) tank closure technology is designed to stabilize any remaining radionuclides and hazardous constituents left in a tank after bulk waste removal. Two Savannah River Site (SRS) HLW tanks were closed after cleansing and then filling each tank with three layers of grout. The first layer consists of a chemically reducing grout. The fill material has chemical properties that retard the movement of some radionuclides and chemical constituents. A layer of controlled low-strength material (CLSM), a self-leveling fill material, is placed on top of the reducing grout. CLSM provides sufficient strength to support the overbearing weight. The final layer is a free-flowing, strong grout similar to normal concrete. After the main tank cavity is filled, risers are filled with grout, and all waste transfer piping connected to the tank is isolated. The tank ventilation system is dismantled, and the remaining systems are isolated. Equipment that remains with the tank is filled with grout. The tank and ancillary systems are left in a state requiring only limited surveillance. Administrative procedures are in place to control land use and access. DOE eventually plans to remove all of its HLW storage tanks from service. These tanks are located at SRS, Hanford, and Idaho National Engineering and Environmental Laboratory. Low-activity waste storage tanks at Oak Ridge Reservation are also scheduled for closure

  2. Distributed Programming via Safe Closure Passing

    Directory of Open Access Journals (Sweden)

    Philipp Haller

    2016-02-01

    Full Text Available Programming systems incorporating aspects of functional programming, e.g., higher-order functions, are becoming increasingly popular for large-scale distributed programming. New frameworks such as Apache Spark leverage functional techniques to provide high-level, declarative APIs for in-memory data analytics, often outperforming traditional "big data" frameworks like Hadoop MapReduce. However, widely-used programming models remain rather ad-hoc; aspects such as implementation trade-offs, static typing, and semantics are not yet well-understood. We present a new asynchronous programming model that has at its core several principles facilitating functional processing of distributed data. The emphasis of our model is on simplicity, performance, and expressiveness. The primary means of communication is by passing functions (closures to distributed, immutable data. To ensure safe and efficient distribution of closures, our model leverages both syntactic and type-based restrictions. We report on a prototype implementation in Scala. Finally, we present preliminary experimental results evaluating the performance impact of a static, type-based optimization of serialization.

  3. Targeted transtracheal stimulation for vocal fold closure.

    Science.gov (United States)

    Hadley, Aaron J; Thompson, Paul; Kolb, Ilya; Hahn, Elizabeth C; Tyler, Dustin J

    2014-06-01

    Paralysis of the structures in the head and neck due to stroke or other neurological disorder often causes dysphagia (difficulty in swallowing). Patients with dysphagia have a significantly higher incidence of aspiration pneumonia and death. The recurrent laryngeal nerve (RLN), which innervates the intrinsic laryngeal muscles that control the vocal folds, travels superiorly in parallel to the trachea in the tracheoesophageal groove. This study tests the hypothesis that functional electrical stimulation (FES) applied via transtracheal electrodes can produce controlled vocal fold adduction. Bipolar electrodes were placed at 15° intervals around the interior mucosal surface of the canine trachea, and current was applied to the tissue while electromyography (EMG) from the intrinsic laryngeal muscles and vocal fold movement visualization via laryngoscopy were recorded. The lowest EMG thresholds were found at an average location of 100° to the left of the ventral midsagittal line and 128° to the right. A rotatable pair of bipolar electrodes spaced 230° apart were able to stimulate bilaterally both RLNs in every subject. Laryngoscopy showed complete glottal closure with transtracheal stimulation in six of the eight subjects, and this closure was maintained under simultaneous FES-induced laryngeal elevation. Transtracheal stimulation is an effective tool for minimally invasive application of FES to induce vocal fold adduction, providing an alternative mechanism to study airway protection.

  4. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  5. Vascular Closure Devices in Interventional Radiology Practice

    Energy Technology Data Exchange (ETDEWEB)

    Patel, Rafiuddin, E-mail: rafiuddin.patel@ouh.nhs.uk [John Radcliffe Hospital, Department of Radiology (United Kingdom); Muller-Hulsbeck, Stefan, E-mail: muehue@diako.de [Diakonissen Hospital, Diagnostic and Interventional Radiology/Neuroradiology (Germany); Morgan, Robert, E-mail: robert.morgan@stgeorges.nhs.uk [St George’s Hospital, Department of Radiology (United Kingdom); Uberoi, Raman, E-mail: raman.uberoi@orh.nhs.uk [John Radcliffe Hospital, Department of Radiology (United Kingdom)

    2015-08-15

    Manual compression (MC) is a well-established technique for haemostasis following percutaneous arterial intervention. However, MC is labour and time intensive with potential limitations, particularly for patients who are coagulopathic, unable to comply with bed rest or obese and when large sheaths or anti-coagulants are used. There are a variety of vascular closure devices (VCDs) available to overcome these limitations. This review gives an overview of current VCDs, their mechanism of action, individual strengths and weaknesses, evidence base and utility in interventional radiology (IR) practice. The majority of the published evidence on VCDs is derived from patients undergoing cardiac interventions, which should be borne in mind when considering the applicability and transfer of this data for general IR practice. Overall, the evidence suggests that most VCDs are effective in achieving haemostasis with a similar rate of complications to MC although the complication profile associated with VCDs is distinct to that of MC. There is insufficient evidence to comparatively analyse the different types of VCDs currently available or reliably judge their cost-effectiveness. The interventional radiologist should have a thorough understanding of the available techniques for haemostasis and be able to identify and utilise the most appropriate strategy and closure technique for the individual patient.

  6. Container Closure Integrity Testing of Prefilled Syringes.

    Science.gov (United States)

    Peláez, Sarah S; Mahler, Hanns-Christian; Matter, Anja; Koulov, Atanas; Singh, Satish K; Germershaus, Oliver; Mathaes, Roman

    2018-04-04

    Prefilled syringes (PFSs) are increasingly preferred over vials as container closure systems (CCSs) for injectable drug products when facilitated or self-administration is required. However, PFSs are more complex compared to CCSs consisting of vial, rubber stopper and crimp cap. Container closure integrity (CCI) assurance and verification has been a specific challenge for PFSs as they feature several sealing areas. A comprehensive understanding of the CCS is necessary for an appropriate CCI assessment as well as for packaging development and qualification. A comprehensive CCI assessment of six different PFSs from three different manufacturers (including one polymeric PFS) was conducted using helium leak testing. PFS components were manipulated to systematically assess the contribution of the different sealing areas to CCI, namely rigid needle shield (RNS)/needle, RNS/tip cone and the individual ribs of a syringe plunger. The polymeric PFS required an equilibrium measurement for accurate CCIT. The different sealing areas and a single plunger rib were shown to provide adequate CCI. Acceptable tip cap movement until the point of CCI failure was estimated. The assessment of acceptable tip cap movement demonstrated the importance of considering the RNS/tip cone seal design to ensure CCI of the PFS upon post assembly possesses and shipment. Copyright © 2018. Published by Elsevier Inc.

  7. IT SERVICES AVAILABILITY DURING CERN ANNUAL CLOSURE

    CERN Multimedia

    2002-01-01

    Mail, NICE 2000, Web, EDMS (in collaboration with EST Division), General purpose databases, lxbatch, lxplus, Automated tape devices, Castor, Backups, Campus Network, Remedy, Security and VPN services will be available during the CERN annual closure. Problems developing on these services should be addressed within about half a day except on Christmas and New Year evenings, December 25, 2002 and January 1st, 2003. All other services will be left running mostly unattended. No interruptions are scheduled but restoration of the service in case of failure cannot be guaranteed. It should be noted that the Helpdesk will be closed, that no file restores from backups will be possible and damaged tapes will not be processed. An operator service will be maintained and can be reached at extension 75011 or by email to computer.operations@cern.ch. Please remember to shutdown and power off any equipment in your office which is not foreseen to be used during the annual closure before you leave for the holiday.

  8. Site Closure Strategy Model for Creosote Site

    International Nuclear Information System (INIS)

    Coll, F.R.; Gray, D.R.

    2009-01-01

    In conjunction with RCRA site corrective action at an active wood preserving facility, a risk-based site closure strategy was developed and incorporated the performance of a dense non-aqueous phase liquid (DNAPL) source recovery remedy, a monitored natural attenuation (MNA) remedy for dissolved phase groundwater, and institutional controls. Innovative creosote DNAPL source recovery has been undertaken at the Site since 1998. Pooled creosote DNAPL is present 90 feet below ground within a transmissive sand and gravel aquifer with a saturated thickness of approximately 80 feet. The creosote DNAPL source is situated on the property boundary of the site and has generated a 1/2 mile off-site dissolved phase plume, creating significant NAPL management and remedial technology verification issues. To date, over 120,000 gallons of creosote DNAPL have been recovered from the subsurface utilizing a modified circulation well technology. A mass discharge flux protocol was developed to serve as a major performance metrics for the continuation of source removal efforts and to support the application of monitored natural attenuation as an associated remedial technology for groundwater. The mass removal success has supported the MNA remedy for dissolved phase groundwater and the associated development of institutional controls. The enacted site management strategy outlines the current and future risk management activities for the Site and represents an appropriate site closure strategy for the Site. (authors)

  9. Impact of Different Standard Type A7A Drum Closure-Ring Practices on Gasket Contraction and Bolt Closure Distance– 15621

    Energy Technology Data Exchange (ETDEWEB)

    Ketusky, Edward [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Blanton, Paul [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bobbitt, John H. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-03-11

    The Department of Energy, the Savannah River National Laboratory, several manufacturers of specification drums, and the United States Department of Transportation (DOT) are collaborating in the development of a guidance document for DOE contractors and vendors who wish to qualify containers to DOT 7A Type A requirements. Currently, the effort is focused on DOT 7A Type A 208-liter (55-gallons) drums with a standard 12-gauge bolted closure ring. The U.S. requirements, contained in Title 49, Part 178.350 “Specification 7A; general packaging, Type A specifies a competent authority review of the packaging is not required for the transport of (Class 7) radioactive material containing less than Type A quantities of radioactive material. For Type AF drums, a 4 ft. regulatory free drop must be performed, such that the drum “suffers maximum damage.” Although the actual orientation is not defined by the specification, recent studies suggest that maximum damage would result from a shallow angle top impact, where kinetic energy is transferred to the lid, ultimately causing heavy damage to the lid, or even worse, causing the lid to come off. Since each vendor develops closure recommendations/procedures for the drums they manufacture, key parameters applied to drums during closing vary based on vendor. As part of the initial phase of the collaboration, the impact of the closure variants on the ability of the drum to suffer maximum damage is investigated. Specifically, closure testing is performed varying: 1) the amount of torque applied to the closure ring bolt; and, 2) stress relief protocol, including: a) weight of hammer; and, b) orientation that the hammer hits the closure ring. After closure, the amount of drum lid gasket contraction and the distance that the closure bolt moves through the closure ring is measured.

  10. On the Tengiz petroleum deposit previous study

    International Nuclear Information System (INIS)

    Nysangaliev, A.N.; Kuspangaliev, T.K.

    1997-01-01

    Tengiz petroleum deposit previous study is described. Some consideration about structure of productive formation, specific characteristic properties of petroleum-bearing collectors are presented. Recommendation on their detail study and using of experience on exploration and development of petroleum deposit which have analogy on most important geological and industrial parameters are given. (author)

  11. Subsequent pregnancy outcome after previous foetal death

    NARCIS (Netherlands)

    Nijkamp, J. W.; Korteweg, F. J.; Holm, J. P.; Timmer, A.; Erwich, J. J. H. M.; van Pampus, M. G.

    Objective: A history of foetal death is a risk factor for complications and foetal death in subsequent pregnancies as most previous risk factors remain present and an underlying cause of death may recur. The purpose of this study was to evaluate subsequent pregnancy outcome after foetal death and to

  12. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick; Petrello, Jaclyn

    2016-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  13. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States); Petrello, Jaclyn [Navarro, Las Vegas, NV (United States)

    2016-03-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  14. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk- In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Subsequently, this plan was modified again and approved as Y/TS-395, Revised RCRA Closure Plan for the Bear Creek Burial Grounds (February 29, 1988). Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. The plan was presented to the state of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. This amended closure plan goes further to include inspection and maintenance criteria along with other details

  15. The safety and efficacy of hemostasis with Clo-Sur P.A.D. after transcatheter arterial chemoembolization

    International Nuclear Information System (INIS)

    Jung, Seung Chai; Jae, Hwan Jun; Kim, Sang Youn; Lee, Whal; Chung, Jin Wook; Park, Jae Hyung

    2007-01-01

    We wanted to evaluate the safety and efficacy of a new hemostatic device, Clo-Sur P.A.D., at an arterial access site after performing femoral arterial catheterization to achieve transcatheter arterial chemoembolization (TACE). From August 2002 to March 2005, 113 patients who underwent TACE and agreed on using the Clo-Sur P.A.D. were enrolled in this study. We evaluated the mean time interval from compression to the first movement and also to the first walk. We also evaluated such complications as rebleeding, pseudoaneurysm, vascular occlusion, hematoma, infection and pain. For 92 patients who had previous experiences with manual compression, we evaluated their preference of hemostatic method by asking them. Successful hemostasis was achieved with the Clo-Sur P.A.D. in 105 subjects (92%). The mean time interval from compression to the first movement was 201 minutes, and that to the first walk was 267 minutes. There was no statistical difference between the complicated and the uncomplicated groups for the mean time, prothrombin time, Child-Pugh class and platelet count (ρ > 0.05). Rebleeding occurred in 3 patients (2.7%) and mild hematoma around puncture site was noted in 5 patients (5.4%). Eighty-seven patients (95%) preferred Clo-Sur P.A.D. to the manual compression method. The Clo-Sur P.A.D. is a safe and effective hemostatic device and it provides early ambulation after TACE

  16. Primary closure of lawn mower injuries to the foot: a case series.

    Science.gov (United States)

    Goldsmith, Jon R; Massa, Eric G

    2007-01-01

    The standard initial treatment of lawn mower injuries to the foot consists of prompt administration of parenteral antibiotics, debridement of devitalized tissue, irrigation, repair of traumatized vascular structures, and stabilization of osseous fractures. The primary closure of these wounds at the initial operation is a controversial concept. The authors performed a retrospective study of 9 lawn mower injuries in which primary closure was performed. Medical records were evaluated, and 7 patients were reached for follow-up interviews. The hospital courses for this patient population were remarkably lower than those previously reported in the literature. No patient required further admission to the hospital or surgical intervention. The postinjury functional evaluation mean score was 97.6%. The results demonstrate that this treatment method can be an effective means for treating this mutilating injury in the foot.

  17. Radioactive material package closures with the use of shape memory alloys

    International Nuclear Information System (INIS)

    Koski, J.A.; Bronowski, D.R.

    1997-11-01

    When heated from room temperature to 165 C, some shape memory metal alloys such as titanium-nickel alloys have the ability to return to a previously defined shape or size with dimensional changes up to 7%. In contrast, the thermal expansion of most metals over this temperature range is about 0.1 to 0.2%. The dimension change of shape memory alloys, which occurs during a martensite to austenite phase transition, can generate stresses as high as 700 MPa (100 kspi). These properties can be used to create a closure for radioactive materials packages that provides for easy robotic or manual operations and results in reproducible, tamper-proof seals. This paper describes some proposed closure methods with shape memory alloys for radioactive material packages. Properties of the shape memory alloys are first summarized, then some possible alternative sealing methods discussed, and, finally, results from an initial proof-of-concept experiment described

  18. Mass extraction container closure integrity physical testing method development for parenteral container closure systems.

    Science.gov (United States)

    Yoon, Seung-Yil; Sagi, Hemi; Goldhammer, Craig; Li, Lei

    2012-01-01

    Container closure integrity (CCI) is a critical factor to ensure that product sterility is maintained over its entire shelf life. Assuring the CCI during container closure (C/C) system qualification, routine manufacturing and stability is important. FDA guidance also encourages industry to develop a CCI physical testing method in lieu of sterility testing in a stability program. A mass extraction system has been developed to check CCI for a variety of container closure systems such as vials, syringes, and cartridges. Various types of defects (e.g., glass micropipette, laser drill, wire) were created and used to demonstrate a detection limit. Leakage, detected as mass flow in this study, changes as a function of defect length and diameter. Therefore, the morphology of defects has been examined in detail with fluid theories. This study demonstrated that a mass extraction system was able to distinguish between intact samples and samples with 2 μm defects reliably when the defect was exposed to air, water, placebo, or drug product (3 mg/mL concentration) solution. Also, it has been verified that the method was robust, and capable of determining the acceptance limit using 3σ for syringes and 6σ for vials. Sterile products must maintain their sterility over their entire shelf life. Container closure systems such as those found in syringes and vials provide a seal between rubber and glass containers. This seal must be ensured to maintain product sterility. A mass extraction system has been developed to check container closure integrity for a variety of container closure systems such as vials, syringes, and cartridges. In order to demonstrate the method's capability, various types of defects (e.g., glass micropipette, laser drill, wire) were created in syringes and vials and were tested. This study demonstrated that a mass extraction system was able to distinguish between intact samples and samples with 2 μm defects reliably when the defect was exposed to air, water

  19. Surgical Experience with Closure of an Isolated PDA at Muhimbili ...

    African Journals Online (AJOL)

    Results: A total of 52 patients with clinical diagnosis of PDA, 26 patients in each treatment group of either standard closure or new closure technique. ... string on the ampulla of the PDA followed by a silk ligature has proved to be efficient and reliable technique that leaves no residual lesion with no long term complications.

  20. Decontamination Study for Mixed Waste Storage Tanks RCRA Closure

    International Nuclear Information System (INIS)

    Leaphart, D.M.; Reed, S.R.; Rankin, W.N.

    1995-01-01

    The Savannah River Site (SRS) plans to close six underground tanks storing mixed waste under RCRA regulations. In support of this closure effort, a study was performed to determine the optimal method of decontaminating these tanks to meet the closure requirements. Items consaidered in the evaluation of the decontamination methods included effectiveness, compatibility with existing waste residues, possible cleaning solution disposal methods, and cost

  1. Cracked Vases and Untidy Seams: Narrative Structure and Closure ...

    African Journals Online (AJOL)

    The TRC reveals a tension between a desire to open up the story of the past and to “close the chapter on our past”. I explore this tension by considering both the TRC's relation to closure and those of selected fictional narratives that explicitly respond to the TRC. I argue that the tidy closure of reconciliation both excludes the ...

  2. The effectiveness of eye-closure in repeated interviews

    NARCIS (Netherlands)

    Vredeveldt, A.; Baddeley, A.D.; Hitch, G.J.

    2014-01-01

    Purpose Closing the eyes during recall can help witnesses remember more about a witnessed event. This study examined the effectiveness of eye-closure in a repeated recall paradigm with immediate free recall followed 1 week later by both free and cued recall. We examined whether eye-closure was more

  3. Structural analysis of closure bolts for shipping casks

    International Nuclear Information System (INIS)

    Mok, G.C.; Fischer, L.E.

    1993-04-01

    This paper identifies the active forces and moments in a closure bolt of a shipping cask. It examines the interactions of these forces/moments and suggest simplified methods for their analysis. The paper also evaluates the role that the forces and moments play in the structure integrity of the closure bolt and recommends stress limits and desirable practices to ensure its integrity

  4. The Finishing Touch: Anatomy of Expert Lesson Closures

    Science.gov (United States)

    Webster, Collin A.; Connolly, Graeme; Schempp, Paul G.

    2009-01-01

    Background: Based on the idea that students remember best what is presented last, the lesson closure is commonly identified as an important component of effective teaching and has recently surfaced as a routine practice of expert teachers in sport. Despite its link to both effective and expert instruction, the lesson closure has seen scarce…

  5. 40 CFR 264.119 - Post-closure notices.

    Science.gov (United States)

    2010-07-01

    ...) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Closure... closure of each hazardous waste disposal unit, the owner or operator must submit to the local zoning... disposal unit of the facility. For hazardous wastes disposed of before January 12, 1981, the owner or...

  6. WASTE PACKAGE OPERATIONS FY99 CLOSURE METHODS REPORT

    Energy Technology Data Exchange (ETDEWEB)

    M. C. Knapp

    1999-09-23

    The waste package (WP) closure weld development task is part of a larger engineering development program to develop waste package designs. The purpose of the larger waste package engineering development program is to develop nuclear waste package fabrication and closure methods that the Nuclear Regulatory Commission will find acceptable and will license for disposal of spent nuclear fuel (SNF), non-fuel components, and vitrified high-level waste within a Monitored Geologic Repository (MGR). Within the WP closure development program are several major development tasks, which, in turn, are divided into subtasks. The major tasks include: WP fabrication development, WP closure weld development, nondestructive examination (NDE) development, and remote in-service inspection development. The purpose of this report is to present the objectives, technical information, and work scope relating to the WP closure weld development.and NDE tasks and subtasks and to report results of the closure weld and NDE development programs for fiscal year 1999 (FY-99). The objective of the FY-99 WP closure weld development task was to develop requirements for closure weld surface and volumetric NDE performance demonstrations, investigate alternative NDE inspection techniques, and develop specifications for welding, NDE, and handling system integration. In addition, objectives included fabricating several flat plate mock-ups that could be used for NDE development, stress relief peening, corrosion testing, and residual stress testing.

  7. Biomechanics Strategies for Space Closure in Deep Overbite

    Directory of Open Access Journals (Sweden)

    Harryanto Wijaya

    2013-07-01

    Full Text Available Space closure is an interesting aspect of orthodontic treatment related to principles of biomechanics. It should be tailored individually based on patient’s diagnosis and treatment plan. Understanding the space closure biomechanics basis leads to achieve the desired treatment objective. Overbite deepening and losing posterior anchorage are the two most common unwanted side effects in space closure. Conventionally, correction of overbite must be done before space closure resulted in longer treatment. Application of proper space closure biomechanics strategies is necessary to achieve the desired treatment outcome. This cases report aimed to show the space closure biomechanics strategies that effectively control the overbite as well as posterior anchorage in deep overbite patients without increasing treatment time. Two patients who presented with class II division 1 malocclusion were treated with fixed orthodontic appliance. The primary strategies included extraction space closure on segmented arch that employed two-step space closure, namely single canine retraction simultaneously with incisors intrusion followed by enmasse retraction of four incisors by using differential moment concept. These strategies successfully closed the space, corrected deep overbite and controlled posterior anchorage simultaneously so that the treatment time was shortened. Biomechanics strategies that utilized were effective to achieve the desired treatment outcome.

  8. Guinea pig ductus arteriosus. II - Irreversible closure after birth.

    Science.gov (United States)

    Fay, F. S.; Cooke, P. H.

    1972-01-01

    To investigate the mechanism underlying irreversibility of ductal closure after birth, studies were undertaken to determine the exact time course for the onset of irreversible closure of the guinea pig ductus arteriosus. Parallel studies of the reactivity of ductal smooth muscle to oxygen and studies of the postpartum cellular changes within the vessel were also carried out.

  9. WASTE PACKAGE OPERATIONS FY-99 CLOSURE METHODS REPORT

    International Nuclear Information System (INIS)

    M. C. Knapp

    1999-01-01

    The waste package (WP) closure weld development task is part of a larger engineering development program to develop waste package designs. The purpose of the larger waste package engineering development program is to develop nuclear waste package fabrication and closure methods that the Nuclear Regulatory Commission will find acceptable and will license for disposal of spent nuclear fuel (SNF), non-fuel components, and vitrified high-level waste within a Monitored Geologic Repository (MGR). Within the WP closure development program are several major development tasks, which, in turn, are divided into subtasks. The major tasks include: WP fabrication development, WP closure weld development, nondestructive examination (NDE) development, and remote in-service inspection development. The purpose of this report is to present the objectives, technical information, and work scope relating to the WP closure weld development.and NDE tasks and subtasks and to report results of the closure weld and NDE development programs for fiscal year 1999 (FY-99). The objective of the FY-99 WP closure weld development task was to develop requirements for closure weld surface and volumetric NDE performance demonstrations, investigate alternative NDE inspection techniques, and develop specifications for welding, NDE, and handling system integration. In addition, objectives included fabricating several flat plate mock-ups that could be used for NDE development, stress relief peening, corrosion testing, and residual stress testing

  10. T-tube vs Primary Common Bile Duct Closure

    Directory of Open Access Journals (Sweden)

    M R Joshi

    2010-09-01

    Full Text Available INTRODUCTION: Closure of the common bile duct over T-tube after exploration is a widely practiced traditional method. However, its use may give rise to many complications. We do primary closure of common bile duct after exploration. Aim of the study is to see the efficacy and safety of the primary closure. METHODS: Study was carried out to compare the results of both the techniques from 2006 to 2009 in the cases proven to have common bile duct stone with or without the features of obstructive jaundice. Post operative hospital stay and morbidities related to both the groups were recorded and analyzed. RESULTS: There were total 71 cases included in the study. Thirty one in T-tube group and 40 in primary closure group. T-tube was removed in most of the cases after three weeks where as average time of drain removal in primary closure group is 5.79 +/-1.79 days. Incidence of retained stone was equal in each group. Major complication in T-tube group is biliary peritonitis in four patients at the time of T-tube removal whereas none of the patient from primary closure group suffered from such major complication. CONCLUSIONS: Primary closure after the common bile duct exploration is safe and it helps to avoid the morbidities related to T-tube. Keywords: Choledocholithiasis, Primary closure, retained stone, T-tube, Ureterorenoscope.

  11. Radiographic study of distal radial physeal closure in thoroughbred horses

    International Nuclear Information System (INIS)

    Vulcano, L.C.; Mamprim, M.J.; Muniz, L.M.R.; Moreira, A.F.; Luna, S.P.L.

    1997-01-01

    Monthly radiography was performed to study distal radial physeal closure in ten male and ten female Throughbred horses. The height, thoracic circumference and metacarpus circumference were also measured, Distal radial physeal closure time was sooner in females than males, and took 701 +/- 37 and 748 +/- 55 days respectively

  12. Vascularized fibular graft combined with vacuum assisted closure in ...

    African Journals Online (AJOL)

    The flowthrough fibular graft combined with Vacuum Assisted Closure (VAC) controlled the infection, shortened the course of treatment, and effectively restored limb function when applied to the treatment of tibial defects. Keywords: Tibial defect, Flow-through fibular graft, Vacuum Assisted Closure, Chronic Osteomyelitis ...

  13. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  14. Bidirectional Barbed Sutures for Wound Closure: Evolution and Applications

    Science.gov (United States)

    Paul, Malcolm D.

    2009-01-01

    Traditionally, wound closure sutures have in common the need to tie knots with the inherent risk of extrusion, palpability, microinfarcts, breakage, and slippage. Bidirectional barbed sutures have barbs arrayed in a helical fashion in opposing directions on either side of an unbarbed midsegment. This suture is inserted at the midpoint of a wound and pulled through till resistance is encountered from the opposing barbs; each half of the suture is then advanced to the lateral ends of the wound. This design provides a method of evenly distributing tension along the incision line, a faster suture placement and closure time with no need to tie knots, and the possibility of improved cosmesis. Bidirectional barbed sutures, which are available in both absorbable and nonabsorbable forms, can be used for simple closures, multilayered closures, and closure of high-tension wounds in a variety of surgical settings. PMID:24527114

  15. Reliability in maintenance and design of elastomer sealed closures

    International Nuclear Information System (INIS)

    Lake, W.H.

    1978-01-01

    The methods of reliability are considered for maintenance and design of elastomer sealed containment closures. Component reliability is used to establish a replacement schedule for system maintenance. Reliability data on elastomer seals is used to evaluate the common practice of annual replacement, and to calculate component reliability values for several typical shipment time periods. System reliability methods are used to examine the relative merits of typical closure designs. These include single component and redundant seal closure, with and without closure verification testing. The paper presents a general method of quantifying the merits of closure designs through the use of reliability analysis, which is a probabilistic technique. The reference list offers a general source of information in the field of reliability, and should offer the opportunity to extend the procedures discussed in this paper to other design safety applications

  16. Socket sclerosis--an obstacle for orthodontic space closure?

    Science.gov (United States)

    Baumgaertel, Sebastian

    2009-07-01

    Socket sclerosis is a rare reaction to tooth extraction resulting in high-density bone in the center of the alveolar process, where, under normal circumstances, cancellous bone is to be expected. In an adult orthodontic patient, routine extractions of the mandibular first permanent bicuspids were performed, resulting in socket sclerosis and unsuccessful orthodontic space closure. Orthodontic mini-implants were inserted to augment anchorage and aid in space closure. In the presence of socket sclerosis, conventional orthodontic mechanics failed to close the extraction spaces. However, with absolute anchorage in place, space closure occurred at a nearly normal rate. After treatment, no signs of socket sclerosis were discernible on the periapical radiographs. Socket sclerosis can be an obstacle for orthodontic space closure if traditional mechanics are employed. However, mini-implant-reinforced anchorage can lead to successful space closure, resulting in complete resolution of the sclerotic sites.

  17. Predictors of successful closure of patent ductus arteriosus with indomethacin.

    Science.gov (United States)

    Ahamed, M F; Verma, P; Lee, S; Vega, M; Wang, D; Kim, M; Fuloria, M

    2015-09-01

    To determine whether platelet counts can predict the likelihood of successful closure of patent ductus arteriosus (PDA) with indomethacin. This was a retrospective cohort study of infants closure with indomethacin and those who failed were compared. Multivariable logistic regression was used to identify predictors of successful ductal closure. In infants with hemodynamically significant PDA, older GA (odds ratio=1.54; 95% confidence interval: 1.12 to 2.13), male gender (odds ratio=3.02; 95% confidence interval: 1.08 to 8.49) and higher platelet count (odds ratio=1.5; 95% confidence interval: 1.04 to 2.17) prior to indomethacin treatment were associated with successful ductal closure with indomethacin. Older GA, male gender and higher platelet count at time of treatment of hemodynamically significant PDA are predictors of successful ductal closure with indomethacin.

  18. Subsequent childbirth after a previous traumatic birth.

    Science.gov (United States)

    Beck, Cheryl Tatano; Watson, Sue

    2010-01-01

    Nine percent of new mothers in the United States who participated in the Listening to Mothers II Postpartum Survey screened positive for meeting the Diagnostic and Statistical Manual of Mental Disorders, Fourth Edition criteria for posttraumatic stress disorder after childbirth. Women who have had a traumatic birth experience report fewer subsequent children and a longer length of time before their second baby. Childbirth-related posttraumatic stress disorder impacts couples' physical relationship, communication, conflict, emotions, and bonding with their children. The purpose of this study was to describe the meaning of women's experiences of a subsequent childbirth after a previous traumatic birth. Phenomenology was the research design used. An international sample of 35 women participated in this Internet study. Women were asked, "Please describe in as much detail as you can remember your subsequent pregnancy, labor, and delivery following your previous traumatic birth." Colaizzi's phenomenological data analysis approach was used to analyze the stories of the 35 women. Data analysis yielded four themes: (a) riding the turbulent wave of panic during pregnancy; (b) strategizing: attempts to reclaim their body and complete the journey to motherhood; (c) bringing reverence to the birthing process and empowering women; and (d) still elusive: the longed-for healing birth experience. Subsequent childbirth after a previous birth trauma has the potential to either heal or retraumatize women. During pregnancy, women need permission and encouragement to grieve their prior traumatic births to help remove the burden of their invisible pain.

  19. Experience with the vacuum assisted closure negative pressure technique in the treatment of non-healing diabetic and dysvascular wounds.

    Science.gov (United States)

    Clare, Michael P; Fitzgibbons, Timothy C; McMullen, Scott T; Stice, R Colleen; Hayes, Dennis F; Henkel, Loree

    2002-10-01

    The purpose of this study is to report our experience with the Vacuum Assisted Closure (VAC) negative pressure technique in patients with non-healing wounds of the foot, ankle, and lower limb. We retrospectively reviewed 17 patients with non-healing wounds of the lower extremity who underwent treatment using the Vacuum Assisted Closure (VAC) device. Thirteen of 17 (76%) had diabetes mellitus, nine of whom were insulin-dependent, and 10 of whom had associated peripheral neuropathy. Eight of 17 (47%) had severe peripheral vascular disease. All had failed previous management with serial wound debridements and dressing changes; 15 of 17 (88%) had previously completed at least one course of oral antibiotics. Thirteen of 17 (76%) had previously undergone operative irrigation and debridement of the wounds; six of 17 (35%) had previously undergone revascularization procedures of the involved extremity. Five of 17 (29%) had wounds necessitating an amputation procedure prior to the present treatment; seven of 17 (41%) had failed treatment with local growth factors prior to the present treatment. Average length of treatment with the VAC device was 8.2 weeks. Fourteen of 17 (82%) wounds successfully healed; four underwent split-thickness skin grafting for wound closure; four were briefly treated with local growth factors; six were treated with only dressing changes following VAC treatment. Three of 17 (18%) wounds failed VAC treatment; all three patients had diabetes and had wounds located in the midfoot or forefoot; two of three had severe peripheral vascular disease. Our results indicate that the Vacuum Assisted Closure negative pressure technique is emerging as an acceptable option for wound care of the lower extremity. Not all patients are candidates for such treatment; those patients with severe peripheral vascular disease or smaller forefoot wounds may be best treated by other modalities. Larger wounds seem to be better suited for skin grafting or two-stage primary

  20. Single-site neural tube closure in human embryos revisited.

    Science.gov (United States)

    de Bakker, Bernadette S; Driessen, Stan; Boukens, Bastiaan J D; van den Hoff, Maurice J B; Oostra, Roelof-Jan

    2017-10-01

    Since the multi-site closure theory was first proposed in 1991 as explanation for the preferential localizations of neural tube defects, the closure of the neural tube has been debated. Although the multi-site closure theory is much cited in clinical literature, single-site closure is most apparent in literature concerning embryology. Inspired by Victor Hamburgers (1900-2001) statement that "our real teacher has been and still is the embryo, who is, incidentally, the only teacher who is always right", we decided to critically review both theories of neural tube closure. To verify the theories of closure, we studied serial histological sections of 10 mouse embryos between 8.5 and 9.5 days of gestation and 18 human embryos of the Carnegie collection between Carnegie stage 9 (19-21 days) and 13 (28-32 days). Neural tube closure was histologically defined by the neuroepithelial remodeling of the two adjoining neural fold tips in the midline. We did not observe multiple fusion sites in neither mouse nor human embryos. A meta-analysis of case reports on neural tube defects showed that defects can occur at any level of the neural axis. Our data indicate that the human neural tube fuses at a single site and, therefore, we propose to reinstate the single-site closure theory for neural tube closure. We showed that neural tube defects are not restricted to a specific location, thereby refuting the reasoning underlying the multi-site closure theory. Clin. Anat. 30:988-999, 2017. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  1. Occupational closure in nursing work reconsidered

    DEFF Research Database (Denmark)

    Traynor, Michael; Nissen, Nina; Lincoln, Carol

    2015-01-01

    In healthcare, occupational groups have adopted tactics to maintain autonomy and control over their areas of work. Witz described a credentialist approach to occupational closure adopted by nursing in the United Kingdom during the 19th and early 20th centuries. However, the recent advancement...... boundaries and a usurpatory stance towards these boundaries. Participants had usually been handpicked by managers and some were ambitious and confident in their abilities. Many aspired to train to be nurses claiming that they will gain recognition that they do not currently get but which they deserve....... Their scope of practice is based upon their managers' or supervisors' perception of their individual aptitude rather than on a credentialist claim. They 'usurp' nurses claim to be the healthcare worker with privileged access to patients, saying they have taken over what nursing has considered its core work...

  2. Gonioscopy in primary angle closure glaucoma.

    Science.gov (United States)

    Bruno, Christina A; Alward, Wallace L M

    2002-06-01

    Primary angle closure is a condition characterized by obstruction to aqueous humor outflow by the peripheral iris, and results in changes in the iridocorneal angle that are visible through gonioscopic examination. Gonioscopy in these eyes, however, can be difficult. This chapter discusses techniques that might help in the examination. These include beginning the examination with the inferior angle, methods to help in looking over the iris, cycloplegia, locating the corneal wedge, indentation, van Herick estimation, examining the other eye, and topical glycerin. Finally, there is a discussion about the pathology associated with the closed angle, with emphasis on the appearance of iris bombé, plateau iris, and the distinction between iris processes and peripheral anterior synechiae.

  3. Closure head for a nuclear reactor

    International Nuclear Information System (INIS)

    Wade, E.E.

    1980-01-01

    A closure head for a nuclear reactor includes a stationary outer ring integral with the reactor vessel with a first rotatable plug disposed within the stationary outer ring and supported from the stationary outer ring by a bearing assembly. A sealing system is associated with the bearing assembly to seal the annulus defined between the first rotatable plug and the stationary outer ring. The sealing system comprises tubular seal elements disposed in the annulus with load springs contacting the tubular seal elements so as to force the tubular seal elements against the annulus in a manner to seal the annulus. The sealing system also comprises a sealing fluid which is pumped through the annulus and over the tubular seal elements causing the load springs to compress thereby reducing the friction between the tubular seal elements and the rotatable components while maintaining a gas-tight seal therebetween

  4. Automated Fuel Element Closure Welding System

    International Nuclear Information System (INIS)

    Wahlquist, D.R.

    1993-01-01

    The Automated Fuel Element Closure Welding System is a robotic device that will load and weld top end plugs onto nuclear fuel elements in a highly radioactive and inert gas environment. The system was developed at Argonne National Laboratory-West as part of the Fuel Cycle Demonstration. The welding system performs four main functions, it (1) injects a small amount of a xenon/krypton gas mixture into specific fuel elements, and (2) loads tiny end plugs into the tops of fuel element jackets, and (3) welds the end plugs to the element jackets, and (4) performs a dimensional inspection of the pre- and post-welded fuel elements. The system components are modular to facilitate remote replacement of failed parts. The entire system can be operated remotely in manual, semi-automatic, or fully automatic modes using a computer control system. The welding system is currently undergoing software testing and functional checkout

  5. Closure for casks containing radioactive materials

    International Nuclear Information System (INIS)

    Hall, G.V.B.; Mallory, C.W.

    1990-01-01

    This patent describes an improved closure for covering and sealing an opening in a single cask for containing radioactive material, wherein the opening is characterized by a ledge. It comprises: an inner lid receivable within the opening and having a gasket means that is seatable over the ledge; an outer lid which is likewise receivable into the opening and securable therearound when the outer lid is rotated relative to the opening. The inner lid remaining stationary relative to the cask opening when the outer lid is rotated and having no torque applied thereto by the outer lid when the outer lid is rotated, and bolt means threadedly mounted through the outer lid for applying a compressive force between the inner and outer lids after the outer lid has been secured to the opening in order to depress the gasket means of the inner lid into sealing engagement with the ledge while avoiding the application of torsion between the gasket means and the ledge

  6. Frictionless segmented mechanics for controlled space closure.

    Science.gov (United States)

    Andrade, Ildeu

    2017-02-01

    Extraction spaces may be needed to achieve specific orthodontic goals of positioning the dentition in harmony with the craniofacial complex. However, the fundamental reality that determines the occlusion final position is the control exerted by the orthodontist while closing the extraction spaces. A specific treatment objective may require the posterior teeth to remain in a constant position anteroposteriorly as well as vertically, while the anterior teeth occupy the entire extraction site. Another treatment objective may require the opposite, or any number of intentional alternatives of extraction site closure. The present case report describes a simple controlled segmented mechanic system that permitted definable and predictable force systems to be applied and allowed to predict the treatment outcome with confidence. This case was presented to the Brazilian Board of Orthodontics and Dentofacial Orthopedics (BBO) in partial fulfillment of the requirements for Diplomate certification.

  7. Frictionless segmented mechanics for controlled space closure

    Directory of Open Access Journals (Sweden)

    Ildeu Andrade Jr

    Full Text Available ABSTRACT Extraction spaces may be needed to achieve specific orthodontic goals of positioning the dentition in harmony with the craniofacial complex. However, the fundamental reality that determines the occlusion final position is the control exerted by the orthodontist while closing the extraction spaces. A specific treatment objective may require the posterior teeth to remain in a constant position anteroposteriorly as well as vertically, while the anterior teeth occupy the entire extraction site. Another treatment objective may require the opposite, or any number of intentional alternatives of extraction site closure. The present case report describes a simple controlled segmented mechanic system that permitted definable and predictable force systems to be applied and allowed to predict the treatment outcome with confidence. This case was presented to the Brazilian Board of Orthodontics and Dentofacial Orthopedics (BBO in partial fulfillment of the requirements for Diplomate certification.

  8. Spontaneous closure of midline diastema following frenectomy

    Directory of Open Access Journals (Sweden)

    Koora Kiran

    2007-03-01

    Full Text Available Maxillary midline diastema is a common aesthetic problem in mixed and early permanent dentitions. The space can occur either as a transient malocclusion or created by developmental, pathological or iatrogenical factors. Many innovative therapies varying from restorative procedures such as composite build-up to surgery (frenectomies and orthodontics are available. Although literature says every frenectomy procedure should be preceded by orthodontic treatment, we opted for frenectomy technique without any orthodontic intervention. Presented herewith is a case report of a 9-year-old girl with a high frenal attachment that had caused spacing of the maxillary central incisors. A spontaneous closure of the midline diastema was noted within 2 months following frenectomy. The patient was followed up for 4 months after which the space remained closed and there was no necessity for an orthodontic treatment at a later stage.

  9. Closures for underground nuclear power plants

    International Nuclear Information System (INIS)

    1981-10-01

    This study demonstrates that, with the appropriate selection of an access concept on the underground nuclear power plant, it is possible to design a gate complying with the increased requirements of the construction of an underground nuclear power plant. The investigations revealed that a comparison leakage of 42 mm in diameter for the failure of seals is too conservative. When selecting suitable seals a leakage being more extensive than the above mentioned one can be prevented even in case of disturbance lasting several months. The closure structures of the personnel and material accesses do not represent any weak point within the concept of the construction method for underground nuclear power plants. (orig./HP)

  10. Comparing over-the-scope clip versus endoloop and clips (KING closure) for access site closure: a randomized experimental study

    Czech Academy of Sciences Publication Activity Database

    Martínek, J.; Ryska, O.; Tučková, I.; Filípková, T.; Doležel, R.; Juhás, Štefan; Motlík, Jan; Zavoral, M.; Ryska, M.

    2013-01-01

    Roč. 27, č. 4 (2013), s. 1203-1210 ISSN 0930-2794 R&D Projects: GA MZd NS9994 Institutional research plan: CEZ:AV0Z50450515 Keywords : NOTES * gastrotomy closure * rectotomy closure Subject RIV: FJ - Surgery incl. Transplants Impact factor: 3.313, year: 2013

  11. 303-K Storage Facility closure plan

    International Nuclear Information System (INIS)

    1993-01-01

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5

  12. ICPP tank farm closure study. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Spaulding, B.C.; Gavalya, R.A.; Dahlmeir, M.M. [and others

    1998-02-01

    The disposition of INEEL radioactive wastes is now under a Settlement Agreement between the DOE and the State of Idaho. The Settlement Agreement requires that existing liquid sodium bearing waste (SBW), and other liquid waste inventories be treated by December 31, 2012. This agreement also requires that all HLW, including calcined waste, be disposed or made road ready to ship from the INEEL by 2035. Sodium bearing waste (SBW) is produced from decontamination operations and HLW from reprocessing of SNF. SBW and HLW are radioactive and hazardous mixed waste; the radioactive constituents are regulated by DOE and the hazardous constituents are regulated by the Resource Conservation and Recovery Act (RCRA). Calcined waste, a dry granular material, is produced in the New Waste Calcining Facility (NWCF). Two primary waste tank storage locations exist at the ICPP: Tank Farm Facility (TFF) and the Calcined Solids Storage Facility (CSSF). The TFF has the following underground storage tanks: four 18,400-gallon tanks (WM 100-102, WL 101); four 30,000-gallon tanks (WM 103-106); and eleven 300,000+ gallon tanks. This includes nine 300,000-gallon tanks (WM 182-190) and two 318,000 gallon tanks (WM 180-181). This study analyzes the closure and subsequent use of the eleven 300,000+ gallon tanks. The 18,400 and 30,000-gallon tanks were not included in the work scope and will be closed as a separate activity. This study was conducted to support the HLW Environmental Impact Statement (EIS) waste separations options and addresses closure of the 300,000-gallon liquid waste storage tanks and subsequent tank void uses. A figure provides a diagram estimating how the TFF could be used as part of the separations options. Other possible TFF uses are also discussed in this study.

  13. Laboratory testing of closure cap repair techniques

    International Nuclear Information System (INIS)

    Persoff, P.; Moridis, G.; Tuck, D.M.

    1996-10-01

    Landfill design requires a low permeability closure cap as well as a low permeability liner. The Savannah River Site, in South Carolina, has approximately 85 acres of mixed waste landfills covered with compacted kaolin clay. Maintaining low permeability of the clay cap requires both that the permeability of the compacted clay itself remain low and that the integrity of the barrier be maintained. Barrier breaches typically result from penetration by roots or animals, and especially cracks caused by uneven settling or desiccation. In this study, clay layers, 0.81 m in diameter and 7.6 cm thick, were compacted in 7 lysimeters to simulate closure caps. The hydraulic conductivity of each layer was measured, and the compacted clay layers (CCL's) were cracked by drying. Then various repair techniques were applied and the effectiveness of each repair was assessed by remeasuring the hydraulic conductivity. Finally the repaired CCL was again dried and measured to determine how the repair responded to the conditions that caused the original failure. For a full report of this investigation see Persoff et al. Six repair techniques have been tested, four of which involve the use of injectable barrier liquids colloidal silica (CS) and polysiloxane (PSX) described below: (I) covering the crack with a bentonite geosynthetic clay liner (GCL), (ii) recompaction of new kaolinite at STD+3 moisture content joined to existing kaolinite that had dried and shrunk, (iii) direct injection of colloidal silica to a crack, (iv) injection of colloidal silica (CS) to wells in an overlying sand layer, (v) direct injection of polysiloxane to a crack, and (vi), injection of polysiloxane (PSX) to wells in an overlying soil layer

  14. ICPP tank farm closure study. Volume 1

    International Nuclear Information System (INIS)

    Spaulding, B.C.; Gavalya, R.A.; Dahlmeir, M.M.

    1998-02-01

    The disposition of INEEL radioactive wastes is now under a Settlement Agreement between the DOE and the State of Idaho. The Settlement Agreement requires that existing liquid sodium bearing waste (SBW), and other liquid waste inventories be treated by December 31, 2012. This agreement also requires that all HLW, including calcined waste, be disposed or made road ready to ship from the INEEL by 2035. Sodium bearing waste (SBW) is produced from decontamination operations and HLW from reprocessing of SNF. SBW and HLW are radioactive and hazardous mixed waste; the radioactive constituents are regulated by DOE and the hazardous constituents are regulated by the Resource Conservation and Recovery Act (RCRA). Calcined waste, a dry granular material, is produced in the New Waste Calcining Facility (NWCF). Two primary waste tank storage locations exist at the ICPP: Tank Farm Facility (TFF) and the Calcined Solids Storage Facility (CSSF). The TFF has the following underground storage tanks: four 18,400-gallon tanks (WM 100-102, WL 101); four 30,000-gallon tanks (WM 103-106); and eleven 300,000+ gallon tanks. This includes nine 300,000-gallon tanks (WM 182-190) and two 318,000 gallon tanks (WM 180-181). This study analyzes the closure and subsequent use of the eleven 300,000+ gallon tanks. The 18,400 and 30,000-gallon tanks were not included in the work scope and will be closed as a separate activity. This study was conducted to support the HLW Environmental Impact Statement (EIS) waste separations options and addresses closure of the 300,000-gallon liquid waste storage tanks and subsequent tank void uses. A figure provides a diagram estimating how the TFF could be used as part of the separations options. Other possible TFF uses are also discussed in this study

  15. Management of low anal fistula: fistulectomy alone versus fistulectomy with primary closure

    International Nuclear Information System (INIS)

    Shahid, M.; Malik, S.; Ahmed, Z.

    2017-01-01

    To compare fistulectomy with primary closure of the wound and fistulectomy alone in the treatment of low anal fistula in terms of healing time. Study Design: Randomized control trial. Place and Duration of Study: Department of General Surgery Combined Military Hospital (CMH) Rawalpindi, from Nov 2006 to May 2007. Material and Methods: Total 60 patients of low anal fistula were enrolled in this study after informed consent and ethical approval. Patients were divided in two groups (A and B) each containing 30 patients. Patient of group A underwent fistulectomy alone whereas patients of group B underwent fistulectomy with primary closure of wound. All the patients were followed two weekly for 06 weeks. On each visit, healing was assessed by naked eye examination of epithelialization and noted on a Proforma. SPSS 17 was used to analyze the results. A p-value of <0.005 was considered statistically significant. Results: At 02 weeks after surgery, none of the patient in group A and 6.6% of group B patients showed wound healing, p-value was not significant i.e. 0.492. At 04 weeks after surgery, 23.3% of group A and 86.6% of group B patients showed wound healing p-value <0.001. At 06 weeks after surgery, 93.3% of group A and 100% of group B patients showed wound healing, p-value was not significant i.e. 0.492. Healing of wound was found more rapid in group B patients who underwent fistulectomy with primary closure of wound. Conclusion: Fistulectomy with primary repair was a better treatment as compared to fistulectomy alone in terms of healing time of wound. (author)

  16. Patent ductus arteriosus closure using an Amplatzer™ ventricular septal defect closure device

    OpenAIRE

    Fernando, Rajeev; Koranne, Ketan; Loyalka, Pranav; Kar, Biswajit; Gregoric, Igor

    2013-01-01

    The ductus arteriosus originates from the persistence of the distal portion of the left sixth aortic arch. It connects the descending aorta (immediately distal to the left subclavian artery) to the roof of the main pulmonary artery, near the origin of the left pulmonary artery. Persistence of the duct beyond 48 h after birth is abnormal and results in patent ductus arteriosus (PDA). PDA is rare in adults because it is usually discovered and treated in childhood. Mechanical closure remains the...

  17. Speckle-Tracking Echocardiography in Dogs With Patent Ductus Arteriosus: Effect of Percutaneous Closure on Cardiac Mechanics.

    Science.gov (United States)

    Spalla, I; Locatelli, C; Zanaboni, A M; Brambilla, P; Bussadori, C

    2016-05-01

    Patent ductus arteriosus (PDA) is 1 of the most common congenital heart defects in dogs and percutaneous closure is effective in achieving ductal closure; PDA closure is associated with abrupt hemodynamic changes. A marked decrease in standard parameters of systolic function as assessed by M- or B-mode echocardiography after PDA closure was identified in previous studies. Speckle tracking echocardiography can provide further insight into the effect of PDA closure on cardiac mechanics in dogs affected by PDA. Twenty-five client-owned dogs with PDA. Prospective study. Dogs were recruited over a 2-year period. Complete echocardiographic evaluation was performed before and 24 hours after PDA closure, including standard (end-diastolic volumes indexed to body surface area in B- and M-mode [EDVIB /M ], end-systolic volumes indexed to body surface area in B- and M-mode [ESVIB /M ], allometric scaling in diastole [AlloD] and systole [AlloS], pulmonary flow to systemic flow [Qs/Qp], ejection fraction [EF], and fractional shortening [FS]), and advanced speckle-tracking echocardiography (STE): global longitudinal, radial, circumferential and transverse strain (S), and strain rate (SR). Patent ductus arteriosus closure was associated with statistically significant decreases in EDVIM /B and ESVIM /B , AlloD and AlloS, SI, EF, and FS. A statistically significant decrease in the absolute values of radial, transverse, and circumferential S and SR was observed, whereas longitudinal S and SR did not change significantly. Patent ductus arteriosus closure by percutaneous approach is associated with marked decreases of conventional echocardiographic parameters as a result of the changes in loading conditions, but no evidence of systolic dysfunction was identified by means of STE, as none of the S and SR values were below reference ranges. In the short term, contractility is enhanced in the long axis (long S/SR values were not statistically different before and after closure) and

  18. A refined safety analysis approach for closure of the Hanford Site flammable gas unreviewed safety question

    International Nuclear Information System (INIS)

    Bratzel, D.R.

    1997-01-01

    Following a 1990 investigation into flammable gas generation, retention, and release mechanisms within the Hanford Site high-level waste tanks, personnel concluded that the existing Authorization Basis documentation did not adequately evaluate flammable gas hazards. This declaration was based primarily on the fact that personnel did not adequately consider hydrogen and nitrous oxide evolution within the material in certain waste tanks and subsequent hypothetical ignition in the development of safety documentation for the waste tanks. The US Department of Energy-Headquarters subsequently declared an Unreviewed Safety Question (USQ). Although work scope has been focused on closure of the USQ since 1990, the DOE has yet to close the USQ because of considerable uncertainty regarding essential technical parameters and associated risk. The DOE recently approved a Basis for Interim Operation to revise the Authorization Basis for managing the tank farms, however, the USQ remains open. The two fundamental requirements for closure of the flammable gas USQ are as follows: development of a defensible technical basis for existing controls; development of a process to assess the adequacy of controls as the waste tank mission progresses

  19. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973 to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.

  20. The Evolution of Approval Services.

    Science.gov (United States)

    Warzala, Martin

    1994-01-01

    Describes major developments in book approval plans used by academic libraries for acquisition and for information dissemination and document distribution services based on approval-like concepts. Topics addressed include publishers; marketing; the impact of library automation; value-added services; the economic climate; the influence of…

  1. Electronic Approval of Invoices (AEF)

    CERN Document Server

    2004-01-01

    With a view to the simplification of administrative procedures, AS and FI Departments have completed the second phase of the new procedure for the electronic approval of invoices via the EDH application. The aim of this new procedure is to rationalise the invoice approval process, notably by eliminating paper copies from the approval circuit. This will simplify the processing of invoices and facilitate their timely settlement, while at the same time maintaining a high level of security. Phase II includes handling the electronic approval process of invoices whose amounts do not correspond exactly to those of the associated orders. In such cases, budgetary approval is required for the entire invoiced amount. Further information can be obtained at : http://ais.cern.ch/projs/AEF/help/F_help.htm Phase II of the procedure will be introduced gradually with effect from April 2004. Finance Department, Accounts Payable Section Tel: 72295 Organisation and Procedures Tel: 75885 Information Technologies Department,...

  2. Online Work Force Analyzes Social Media to Identify Consequences of an Unplanned School Closure – Using Technology to Prepare for the Next Pandemic

    Science.gov (United States)

    Rainey, Jeanette J.; Kenney, Jasmine; Wilburn, Ben; Putman, Ami; Zheteyeva, Yenlik; O’Sullivan, Megan

    2016-01-01

    Background During an influenza pandemic, the United States Centers for Disease Control and Prevention (CDC) may recommend school closures. These closures could have unintended consequences for students and their families. Publicly available social media could be analyzed to identify the consequences of an unplanned school closure. Methods As a proxy for an unplanned, pandemic-related school closure, we used the district-wide school closure due to the September 10–18, 2012 teachers’ strike in Chicago, Illinois. We captured social media posts about the school closure using the Radian6 social media-monitoring platform. An online workforce from Amazon Mechanical Turk categorized each post into one of two groups. The first group included relevant posts that described the impact of the closure on students and their families. The second group included irrelevant posts that described the political aspects of the strike or topics unrelated to the school closure. All relevant posts were further categorized as expressing a positive, negative, or neutral sentiment. We analyzed patterns of relevant posts and sentiment over time and compared our findings to household surveys conducted after other unplanned school closures. Results We captured 4,546 social media posts about the district-wide school closure using our search criteria. Of these, 930 (20%) were categorized as relevant by the online workforce. Of the relevant posts, 619 (67%) expressed a negative sentiment, 51 (5%) expressed a positive sentiment, and 260 (28%) were neutral. The number of relevant posts, and especially those with a negative sentiment, peaked on day 1 of the strike. Negative sentiment expressed concerns about childcare, missed school lunches, and the lack of class time for students. This was consistent with findings from previously conducted household surveys. Conclusion Social media are publicly available and can readily provide information on the impact of an unplanned school closure on students

  3. Online Work Force Analyzes Social Media to Identify Consequences of an Unplanned School Closure - Using Technology to Prepare for the Next Pandemic.

    Science.gov (United States)

    Rainey, Jeanette J; Kenney, Jasmine; Wilburn, Ben; Putman, Ami; Zheteyeva, Yenlik; O'Sullivan, Megan

    During an influenza pandemic, the United States Centers for Disease Control and Prevention (CDC) may recommend school closures. These closures could have unintended consequences for students and their families. Publicly available social media could be analyzed to identify the consequences of an unplanned school closure. As a proxy for an unplanned, pandemic-related school closure, we used the district-wide school closure due to the September 10-18, 2012 teachers' strike in Chicago, Illinois. We captured social media posts about the school closure using the Radian6 social media-monitoring platform. An online workforce from Amazon Mechanical Turk categorized each post into one of two groups. The first group included relevant posts that described the impact of the closure on students and their families. The second group included irrelevant posts that described the political aspects of the strike or topics unrelated to the school closure. All relevant posts were further categorized as expressing a positive, negative, or neutral sentiment. We analyzed patterns of relevant posts and sentiment over time and compared our findings to household surveys conducted after other unplanned school closures. We captured 4,546 social media posts about the district-wide school closure using our search criteria. Of these, 930 (20%) were categorized as relevant by the online workforce. Of the relevant posts, 619 (67%) expressed a negative sentiment, 51 (5%) expressed a positive sentiment, and 260 (28%) were neutral. The number of relevant posts, and especially those with a negative sentiment, peaked on day 1 of the strike. Negative sentiment expressed concerns about childcare, missed school lunches, and the lack of class time for students. This was consistent with findings from previously conducted household surveys. Social media are publicly available and can readily provide information on the impact of an unplanned school closure on students and their families. Using social media to

  4. Analysis of Mining-induced Valley Closure Movements

    Science.gov (United States)

    Zhang, C.; Mitra, R.; Oh, J.; Hebblewhite, B.

    2016-05-01

    Valley closure movements have been observed for decades in Australia and overseas when underground mining occurred beneath or in close proximity to valleys and other forms of irregular topographies. Valley closure is defined as the inward movements of the valley sides towards the valley centreline. Due to the complexity of the local geology and the interplay between several geological, topographical and mining factors, the underlying mechanisms that actually cause this behaviour are not completely understood. A comprehensive programme of numerical modelling investigations has been carried out to further evaluate and quantify the influence of a number of these mining and geological factors and their inter-relationships. The factors investigated in this paper include longwall positional factors, horizontal stress, panel width, depth of cover and geological structures around the valley. It is found that mining in a series passing beneath the valley dramatically increases valley closure, and mining parallel to valley induces much more closure than other mining orientations. The redistribution of horizontal stress and influence of mining activity have also been recognised as important factors promoting valley closure, and the effect of geological structure around the valley is found to be relatively small. This paper provides further insight into both the valley closure mechanisms and how these mechanisms should be considered in valley closure prediction models.

  5. Monsoon and primary acute angle closure in malaysia.

    Science.gov (United States)

    Ch'ng, T W; Mosavi, S A A; Noor Azimah, A A; Azlan, N Z; Azhany, Y; Liza-Sharmini, A T

    2013-10-01

    Acute angle closure (AAC) without prompt treatment may lead to optic neuropathy. Environmental factor such as climate change may precipitate pupillary block, the possible mechanism of AAC. To determine the association of northeast monsoon and incidence of AAC in Malaysia. A retrospective study was conducted on AAC patients admitted to two main tertiary hospitals in Kelantan, Malaysia between January 2001 and December 2011. The cumulative number of rainy day, amount of rain, mean cloud cover and 24 hours mean humidity at the estimated day of attack were obtained from the Department of Meteorology, Malaysia. A total 73 cases of AAC were admitted with mean duration of 4.1SD 2.0 days. More than half have previous history of possibility of AAC. There was higher incidence of AAC during the northeast monsoon (October to March). There was also significant correlation of number of rainy day (r=0.718, pclimate as the potential risk factor. Prompt treatment to arrest pupillary block and reduction of the intraocular pressure is important to prevent potential glaucomatous damage. Public awareness of AAC and accessibility to treatment should be part of preparation to face the effect of northeast monsoon.

  6. Books average previous decade of economic misery.

    Science.gov (United States)

    Bentley, R Alexander; Acerbi, Alberto; Ormerod, Paul; Lampos, Vasileios

    2014-01-01

    For the 20(th) century since the Depression, we find a strong correlation between a 'literary misery index' derived from English language books and a moving average of the previous decade of the annual U.S. economic misery index, which is the sum of inflation and unemployment rates. We find a peak in the goodness of fit at 11 years for the moving average. The fit between the two misery indices holds when using different techniques to measure the literary misery index, and this fit is significantly better than other possible correlations with different emotion indices. To check the robustness of the results, we also analysed books written in German language and obtained very similar correlations with the German economic misery index. The results suggest that millions of books published every year average the authors' shared economic experiences over the past decade.

  7. Books Average Previous Decade of Economic Misery

    Science.gov (United States)

    Bentley, R. Alexander; Acerbi, Alberto; Ormerod, Paul; Lampos, Vasileios

    2014-01-01

    For the 20th century since the Depression, we find a strong correlation between a ‘literary misery index’ derived from English language books and a moving average of the previous decade of the annual U.S. economic misery index, which is the sum of inflation and unemployment rates. We find a peak in the goodness of fit at 11 years for the moving average. The fit between the two misery indices holds when using different techniques to measure the literary misery index, and this fit is significantly better than other possible correlations with different emotion indices. To check the robustness of the results, we also analysed books written in German language and obtained very similar correlations with the German economic misery index. The results suggest that millions of books published every year average the authors' shared economic experiences over the past decade. PMID:24416159

  8. ASSESSMENT OF LENS THICKNESS IN ANGLE CLOSURE DISEASE

    Directory of Open Access Journals (Sweden)

    Nishat Sultana Khayoom

    2016-08-01

    Full Text Available BACKGROUND Anterior chamber depth and lens thickness have been considered as important biometric determinants in primary angle-closure glaucoma. Patients with primary narrow angle may be classified as a primary angle closure suspect (PACS, or as having primary angle closure (PAC or primary angle closure glaucoma (PACG. 23.9% of patients with primary angle closure disease are in India, which highlights the importance of understanding the disease, its natural history, and its underlying pathophysiology, so that we may try to establish effective methods of treatment and preventative measures to delay, or even arrest, disease progression, thereby reducing visual morbidity. AIM To determine the lens thickness using A-scan biometry and its significance in various stages of angle closure disease. MATERIALS AND METHODS Patients attending outpatient department at Minto Ophthalmic Hospital between October 2013 to May 2015 were screened for angle closure disease and subsequently evaluated at glaucoma department. In our study, lens thickness showed a direct correlation with shallowing of the anterior chamber by determining the LT/ ACD ratio. A decrease in anterior chamber depth is proportional to the narrowing of the angle which contributes to the progression of the angle closure disease from just apposition to occlusion enhancing the risk for optic nerve damage and visual field loss. Hence, if the lens thickness values are assessed earlier in the disease process, appropriate intervention can be planned. CONCLUSION Determination of lens changes along with anterior chamber depth and axial length morphometrically can aid in early detection of angle closure. The role of lens extraction for PACG is a subject of increased interest. Lens extraction promotes the benefits of anatomical opening of the angle, IOP reduction and improved vision. This potential intervention may be one among the armamentarium of approaches for PACG. Among the current treatment modalities

  9. Biosimilars approval process.

    Science.gov (United States)

    Zuñiga, Leyre; Calvo, Begoña

    2010-04-01

    For similar biological medicinal products, the so-called biosimilars, clinical trials are required rather than just the bioequivalence studies required to support the registration of a generic small molecule drug product. The EU Directive 2001/83/EC, as amended, stated that where a biological medicinal product which is similar to a reference biological product, does not meet the conditions in the definition of generic medicinal products the results of appropriate pre-clinical tests or clinical trials relating to these conditions must be provided. The challenge is to determine the exact nature of the non-clinical and clinical programme required to gain regulatory approval. The applicant is encouraged to provide a detailed description of the strategy used to demonstrate the biosimilar and the reference product have similar profiles in terms of quality, safety and efficacy. The extent to which comparability can be proven will have quite an impact on how many non-clinical and clinical studies the biosimilar applicant will be required to conduct. The dossier submitted by the applicant to the EMEA should cover all aspects of the comparability assessment and must include data on possible unwanted immune reactions to the therapeutic protein. Post-marketing pharmacovigilance plans are also expected to be included in the biosimilar dossier. Copyright 2009 Elsevier Inc. All rights reserved.

  10. Geochemical perspectives from a new aerosol chemical mass closure

    Directory of Open Access Journals (Sweden)

    B. Guinot

    2007-01-01

    Full Text Available The aerosol chemical mass closure is revisited and a simple and inexpensive methodology is proposed. This methodology relies on data obtained for aerosol mass, and concentration of the major ions and the two main carbon components, the organic carbon (OC and the black carbon (BC. Atmospheric particles are separated into coarse (AD>2 μm and fine (AD<2 μm fractions and are treated separately. For the coarse fraction the carbonaceous component is minor and assumption is made for the conversion factor k of OC-to-POM (Particulate Organic Matter which is fixed to the value of 1.8 accounting for secondary species. The coarse soluble calcium is shown to display a correlation (regression coefficient f, y axis intercept b with the missing mass. Conversely, the fine fraction is dominated by organic species and assumption is made for dust which is assumed to have the same f factor as the coarse mode dust. The fine mode mass obtained from chemical analyses is then adjusted to the actual weighed mass by tuning the k conversion factor. The k coefficient is kept different in the two modes due to the expected different origins of the organic particles. Using the f and k coefficient obtained from the data set, the mass closure is reached for each individual sample with an undetermined fraction less than 10%. The procedure has been applied to different urban and peri-urban environments in Europe and in Beijing and its efficiency and uncertainties on f and k values are discussed. The f and k coefficients are shown to offer consistent geochemical indications on aerosol origin and transformations. f allows to retrieve dust mass and its value accounting for Ca abundance in dust at the site of investigation may serve as an indicator of dust origin and aerosol interactions with anthropogenic acids. f values were found to vary in the 0.08–0.12 range in European urban areas, and a broader range in Beijing (0.01–0.16. As expected, k appears to be a relevant proxy for

  11. Tracheocutaneous Fistula Closure with Turnover Flap and Polydioxanone Plate

    Directory of Open Access Journals (Sweden)

    Justin R. Bryant, DO, MBA

    2017-10-01

    Full Text Available Summary:. An alternative surgical treatment is proposed for closure of tracheocutaneous fistulas. The authors present a new technique for reconstruction of persistent tracheocutaneous fistula resultant from temporary tracheostomy. The single-stage closure under local anesthesia involves a fistulous tract turnover flap with a perforated 0.15 mm polydioxanone plate between the flap and the subcutaneous closure. This article presents 3 cases of persistent tracheocutaneous fistula treated by this method. At follow-up examination after follow-up, no recurrent fistula formation had occurred, and no respiratory deformity was present.

  12. Closure of a mixed waste landfill: Lessons learned

    International Nuclear Information System (INIS)

    Phifer, M.A.

    1990-01-01

    Much experience has been gained during the closure of the Mixed Waste Management Facility (MWMF) at the Savannah River Site (SRS) and many lessons were learned. This knowledge was applied to other closures at SRS yielding decreased costs, schedule enhancement, and increased overall project efficiency. The next major area of experience to be gained at SRS in the field of waste site closures will be in the upkeep, maintenance, and monitoring of clay caps. Further test programs will be required to address these requirements

  13. Anterior Segment Imaging Predicts Incident Gonioscopic Angle Closure.

    Science.gov (United States)

    Baskaran, Mani; Iyer, Jayant V; Narayanaswamy, Arun K; He, Yingke; Sakata, Lisandro M; Wu, Renyi; Liu, Dianna; Nongpiur, Monisha E; Friedman, David S; Aung, Tin

    2015-12-01

    To investigate the incidence of gonioscopic angle closure after 4 years in subjects with gonioscopically open angles but varying degrees of angle closure detected on anterior segment optical coherence tomography (AS OCT; Visante; Carl Zeiss Meditec, Dublin, CA) at baseline. Prospective, observational study. Three hundred forty-two subjects, mostly Chinese, 50 years of age or older, were recruited, of whom 65 were controls with open angles on gonioscopy and AS OCT at baseline, and 277 were cases with baseline open angles on gonioscopy but closed angles (1-4 quadrants) on AS OCT scans. All subjects underwent gonioscopy and AS OCT at baseline (horizontal and vertical single scans) and after 4 years. The examiner performing gonioscopy was masked to the baseline and AS OCT data. Angle closure in a quadrant was defined as nonvisibility of the posterior trabecular meshwork by gonioscopy and visible iridotrabecular contact beyond the scleral spur in AS OCT scans. Gonioscopic angle closure in 2 or 3 quadrants after 4 years. There were no statistically significant differences in age, ethnicity, or gender between cases and controls. None of the control subjects demonstrated gonioscopic angle closure after 4 years. Forty-eight of the 277 subjects (17.3%; 95% confidence interval [CI], 12.8-23; P < 0.0001) with at least 1 quadrant of angle closure on AS OCT at baseline demonstrated gonioscopic angle closure in 2 or more quadrants, whereas 28 subjects (10.1%; 95% CI, 6.7-14.6; P < 0.004) demonstrated gonioscopic angle closure in 3 or more quadrants after 4 years. Individuals with more quadrants of angle closure on baseline AS OCT scans had a greater likelihood of gonioscopic angle closure developing after 4 years (P < 0.0001, chi-square test for trend for both definitions of angle closure). Anterior segment OCT imaging at baseline predicts incident gonioscopic angle closure after 4 years among subjects who have gonioscopically open angles and iridotrabecular contact on AS OCT at

  14. Primary angle closure glaucoma in a myopic kinship.

    Science.gov (United States)

    Hagan, J C; Lederer, C M

    1985-03-01

    Three related myopic individuals with primary angle closure glaucoma are reported. They had true myopia and not pseudomyopia secondary to increased lenticular index of refraction. We believe one of these individuals (-8.62 spherical equivalent) to have the most myopic case of primary angle closure glaucoma reported in the literature. Although myopia is associated with anatomical factors that offer considerable protection from primary angle closure glaucoma, its presence does not eliminate the possibility of this disease. Laser iridectomy was effective in the treatment of these patients.

  15. The effectiveness of eye-closure in repeated interviews

    OpenAIRE

    Vredeveldt, A.; Baddeley, A.D.; Hitch, G.J.

    2014-01-01

    Purpose Closing the eyes during recall can help witnesses remember more about a witnessed event. This study examined the effectiveness of eye-closure in a repeated recall paradigm with immediate free recall followed 1 week later by both free and cued recall. We examined whether eye-closure was more or less effective during the second free-recall attempt compared with the first, whether eye-closure during the first recall attempt had an impact on subsequent free- and cued-recall performance, a...

  16. Clad vent set cup closure-weld-zone grinding evaluation

    International Nuclear Information System (INIS)

    Ulrich, G.B.; Woods, A.T.; Ohriner, E.K.

    1996-04-01

    Clad vent set (CVS) cups were ground in the closure-weld zone to reduce the wall-thickness variation created by the cup deep-drawing process. A significantly more uniform wall thickness would be beneficial for the CVS closure-weld operation. The goal was to reduce the average within-cup wall-thickness variation (defined as the range of wall thicknesses in the closure-weld zone) approximately 50% from the Cassini production value of 42 microm. This goal was shown to be achievable but, unfortunately, not with the existing blank and formed cup thicknesses

  17. Cleft Palate Fistula Closure Utilizing Acellular Dermal Matrix.

    Science.gov (United States)

    Emodi, Omri; Ginini, Jiriys George; van Aalst, John A; Shilo, Dekel; Naddaf, Raja; Aizenbud, Dror; Rachmiel, Adi

    2018-03-01

    Fistulas represent failure of cleft palate repair. Secondary and tertiary fistula repair is challenging, with high recurrence rates. In the present retrospective study, we review the efficacy of using acellular dermal matrix as an interposition layer for cleft palate fistula closure in 20 consecutive patients between 2013 and 2016. Complete fistula closure was obtained in 16 patients; 1 patient had asymptomatic recurrent fistula; 2 patients had partial closure with reduction of fistula size and minimal nasal regurgitation; 1 patient developed a recurrent fistula without changes in symptoms (success rate of 85%). We conclude that utilizing acellular dermal matrix for cleft palate fistula repair is safe and simple with a high success rate.

  18. Comparison of Outcomes between Early Fascial Closure and Delayed Abdominal Closure in Patients with Open Abdomen: A Systematic Review and Meta-Analysis

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2014-01-01

    Full Text Available Up to the present, the optimal time to close an open abdomen remains controversial. This study was designed to evaluate whether early fascial abdominal closure had advantages over delayed approach for open abdomen populations. Medline, Embase, and Cochrane Library were searched until April 2013. Search terms included “open abdomen,” “abdominal compartment syndrome,” “laparostomy,” “celiotomy,” “abdominal closure,” “primary,” “delayed,” “permanent,” “fascial closure,” and “definitive closure.” Open abdomen was defined as “fail to close abdominal fascia after a laparotomy.” Mortality, complications, and length of stay were compared between early and delayed fascial closure. In total, 3125 patients were included for final analysis, and 1942 (62% patients successfully achieved early fascial closure. Vacuum assisted fascial closure had no impact on pooled fascial closure rate. Compared with delayed abdominal closure, early fascial closure significantly reduced mortality (12.3% versus 24.8%, RR, 0.53, P<0.0001 and complication incidence (RR, 0.68, P<0.0001. The mean interval from open abdomen to definitive closure ranged from 2.2 to 14.6 days in early fascial closure groups, but from 32.5 to 300 days in delayed closure groups. This study confirmed clinical advantages of early fascial closure over delayed approach in treatment of patients with open abdomen.

  19. Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Reedlunn, Benjamin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-01

    Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

  20. An approach to handling timescales in post-closure safety assessment

    International Nuclear Information System (INIS)

    Bailey, L.; Littleboy, A.

    2002-01-01

    Previous Nirex post-closure assessments of deep geological disposal have been based on the use of probabilistic safety analysis covering many millions of years. However, Nirex has also published an assessment methodology in which the assessment timescale is divided into a number of discrete periods of time (time frames). Nirex is currently at the stage of planning the next update to its generic post-closure performance assessment and is considering the merits of using an assessment methodology based on time frames, in order to improve links with operational assessments and the provision of advice on the packaging of wastes, and to encourage stakeholder dialogue. This paper has been prepared as part of Nirex's aim, wherever possible, to 'preview', or seek input from others on, its ideas for new work to generate discussion and feedback. It describes an evolution of Nirex's published assessment methodology and outlines how it could be applied in an updated post-closure performance assessment of the Nirex generic phased disposal concept. (authors)

  1. Optimization and large scale computation of an entropy-based moment closure

    Science.gov (United States)

    Kristopher Garrett, C.; Hauck, Cory; Hill, Judith

    2015-12-01

    We present computational advances and results in the implementation of an entropy-based moment closure, MN, in the context of linear kinetic equations, with an emphasis on heterogeneous and large-scale computing platforms. Entropy-based closures are known in several cases to yield more accurate results than closures based on standard spectral approximations, such as PN, but the computational cost is generally much higher and often prohibitive. Several optimizations are introduced to improve the performance of entropy-based algorithms over previous implementations. These optimizations include the use of GPU acceleration and the exploitation of the mathematical properties of spherical harmonics, which are used as test functions in the moment formulation. To test the emerging high-performance computing paradigm of communication bound simulations, we present timing results at the largest computational scales currently available. These results show, in particular, load balancing issues in scaling the MN algorithm that do not appear for the PN algorithm. We also observe that in weak scaling tests, the ratio in time to solution of MN to PN decreases.

  2. Machine Learning-based discovery of closures for reduced models of dynamical systems

    Science.gov (United States)

    Pan, Shaowu; Duraisamy, Karthik

    2017-11-01

    Despite the successful application of machine learning (ML) in fields such as image processing and speech recognition, only a few attempts has been made toward employing ML to represent the dynamics of complex physical systems. Previous attempts mostly focus on parameter calibration or data-driven augmentation of existing models. In this work we present a ML framework to discover closure terms in reduced models of dynamical systems and provide insights into potential problems associated with data-driven modeling. Based on exact closure models for linear system, we propose a general linear closure framework from viewpoint of optimization. The framework is based on trapezoidal approximation of convolution term. Hyperparameters that need to be determined include temporal length of memory effect, number of sampling points, and dimensions of hidden states. To circumvent the explicit specification of memory effect, a general framework inspired from neural networks is also proposed. We conduct both a priori and posteriori evaluations of the resulting model on a number of non-linear dynamical systems. This work was supported in part by AFOSR under the project ``LES Modeling of Non-local effects using Statistical Coarse-graining'' with Dr. Jean-Luc Cambier as the technical monitor.

  3. Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Reedlunn, Benjamin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-09-27

    Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under-predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under-predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

  4. Long-term follow-up for keystone design perforator island flap for closure of myelomeningocele.

    Science.gov (United States)

    Donaldson, Christopher; Murday, Hamsaveni K M; Gutman, Matthew J; Maher, Rory; Goldschlager, Tony; Xenos, Chris; Danks, R Andrew

    2018-04-01

    We have previously reported a small series on the closure of large myelomeningocele (MMC) defects with a keystone design perforator island flap (KDPIF) in a paediatric neurosurgical centre in Australia. We are now presenting an updated longer term follow-up of an expanded series demonstrating longer term durability of this vascularized flap for large myelomeningocele defects. The prospective data from the Monash Neurosurgical Database were used to select all cases of MMC between December 2008 and September 2016. Retrospective analysis of the neurosurgical database revealed an additional three patients who underwent KDPIF closure at the Monash Medical Centre for MMC repair at birth. Wound healing was satisfactory in all six cases. With delayed follow-up, there was no associated skin flap separation, skin flap dehiscence, skin flap necrosis, cerebro-spinal fluid leak, however two infections were encountered, both resolved with conservative management including antibiotics and simple washout. In this expanded case series with increased longevity of follow-up, the keystone design perforator island flap remains a robust alternative for closure of large myelomeningocele defects.

  5. A variational approach to moment-closure approximations for the kinetics of biomolecular reaction networks

    Science.gov (United States)

    Bronstein, Leo; Koeppl, Heinz

    2018-01-01

    Approximate solutions of the chemical master equation and the chemical Fokker-Planck equation are an important tool in the analysis of biomolecular reaction networks. Previous studies have highlighted a number of problems with the moment-closure approach used to obtain such approximations, calling it an ad hoc method. In this article, we give a new variational derivation of moment-closure equations which provides us with an intuitive understanding of their properties and failure modes and allows us to correct some of these problems. We use mixtures of product-Poisson distributions to obtain a flexible parametric family which solves the commonly observed problem of divergences at low system sizes. We also extend the recently introduced entropic matching approach to arbitrary ansatz distributions and Markov processes, demonstrating that it is a special case of variational moment closure. This provides us with a particularly principled approximation method. Finally, we extend the above approaches to cover the approximation of multi-time joint distributions, resulting in a viable alternative to process-level approximations which are often intractable.

  6. Notch signal reception is required in vascular smooth muscle cells for ductus arteriosus closure

    Science.gov (United States)

    Krebs, Luke T.; Norton, Christine R.; Gridley, Thomas

    2017-01-01

    Summary The ductus arteriosus is an arterial vessel that shunts blood flow away from the lungs during fetal life, but normally occludes after birth to establish the adult circulation pattern. Failure of the ductus arteriosus to close after birth is termed patent ductus arteriosus, and is one of the most common congenital heart defects. Our previous work demonstrated that vascular smooth muscle cell expression of the Jag1 gene, which encodes a ligand for Notch family receptors, is essential for postnatal closure of the ductus arteriosus in mice. However, it was not known what cell population was responsible for receiving the Jag1-mediated signal. Here we show, using smooth muscle cell-specific deletion of the Rbpj gene, which encodes a transcription factor that mediates all canonical Notch signaling, that Notch signal reception in the vascular smooth muscle cell compartment is required for ductus arteriosus closure. These data indicate that homotypic vascular smooth muscle cell interactions are required for proper contractile smooth muscle cell differentiation and postnatal closure of the ductus arteriosus in mice. PMID:26742650

  7. A randomized clinical trial of knotless barbed suture vs conventional suture for closure of the uterine incision at cesarean delivery.

    Science.gov (United States)

    Peleg, David; Ahmad, Ronan Said; Warsof, Steven L; Marcus-Braun, Naama; Sciaky-Tamir, Yael; Ben Shachar, Inbar

    2018-03-01

    Knotless barbed sutures are monofilament sutures with barbs cut into them. These sutures self-anchor, maintaining tissue approximation without the need for surgical knots. The hypothesis of this study was that knotless barbed suture could be used on the myometrium to close the hysterotomy at cesarean delivery. The objective was to compare uterine closure time, need for additional sutures, and blood loss between this and a conventional suture. This was a prospective, unblinded, randomized controlled trial conducted at the Ziv Medical Center, Zefat, Israel. The primary outcome was the length of time needed to close the uterine incision, which was measured from the start of the first suture on the uterus until obtaining uterine hemostasis. To minimize provider bias, women were randomized by sealed envelopes that were opened in the operating room just prior to uterine closure with either a bidirectional knotless barbed suture or conventional suture. Secondary outcomes included the number of additional hemostatic sutures needed and blood loss during incision closure. Patients were enrolled from August 2016 until March 2017. One hundred two women were randomized. Fifty-one had uterine closure with knotless barbed suture and 51 with conventional suture. The groups were similar for demographics as well as number of previous cesarean deliveries. Uterine closure time using the knotless barbed suture was significantly shorter than the conventional suture by a mean of 1 minute 43 seconds (P barbed sutures were associated with a lower need for hemostatic sutures (median 0 vs 1, P barbed suture is a reasonable alternative to conventional sutures because it reduced the closure time of the uterine incision. There was also less need for additional hemostatic sutures and slightly reduced estimated blood loss. Copyright © 2018 Elsevier Inc. All rights reserved.

  8. Patent foramen ovale closure versus medical therapy after cryptogenic stroke: An updated meta-analysis of all randomized clinical trials.

    Science.gov (United States)

    Kheiri, Babikir; Abdalla, Ahmed; Osman, Mohammed; Ahmed, Sahar; Hassan, Mustafa; Bachuwa, Ghassan

    2018-03-07

    Cryptogenic strokes can be attributed to paradoxical emboli through patent foramen ovale (PFO). However, the effectiveness of PFO closure in preventing recurrent stroke is uncertain and the results of previous randomized clinical trials (RCTs) have been inconclusive. Hence, this study provides an updated meta-analysis of all RCTs comparing PFO closure with medical therapy for secondary prevention of cryptogenic stroke. All RCTs were identified by a comprehensive literature search of PubMed, Embase, the Cochrane Collaboration Central Register of Controlled Trials, Scopus, and Clinicaltrials.gov. The primary outcome was recurrent ischemic stroke and secondary outcomes were transient ischemic attack (TIA), all-cause mortality, new-onset atrial fibrillation (AF), serious adverse events, and major bleeding. 5 RCTs with 3440 participants were included in the present study (1829 patients underwent PFO closure and 1611 were treated medically). Pooled analysis showed a statistically significant reduction in the rate of recurrent stroke with PFO closure in comparison to medical therapy (OR 0.41; 95% CI 0.19-0.90; p = 0.03). However, there were no statistically significant reductions of recurrent TIAs (OR 0.77; 95% CI 0.51-1.14; p = 0.19) or all-cause mortality (OR 0.76; 95% CI 0.35-1.65; p = 0.48). The risk of developing new-onset AF was increased significantly with PFO closure (OR 4.74; 95% CI 2.33-9.61; p Patent foramen ovale closure in adults with recent cryptogenic stroke was associated with a lower rate of recurrent strokes in comparison with medical therapy alone.

  9. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick

    2016-01-01

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage-transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. The purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is

  10. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2016-08-22

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. The purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is

  11. Drugs Approved for Kidney (Renal Cell) Cancer

    Science.gov (United States)

    ... Your Treatment Research Drugs Approved for Kidney (Renal Cell) Cancer This page lists cancer drugs approved by the ... not listed here. Drugs Approved for Kidney (Renal Cell) Cancer Afinitor (Everolimus) Aldesleukin Avastin (Bevacizumab) Axitinib Bevacizumab Cabometyx ( ...

  12. Left ventricular remodeling and change of systolic function after closure of patent ductus arteriosus in adults: device and surgical closure.

    Science.gov (United States)

    Jeong, Young-Hoon; Yun, Tae-Jin; Song, Jong-Min; Park, Jung-Jun; Seo, Dong-Man; Koh, Jae-Kon; Lee, Se-Whan; Kim, Mi-Jeong; Kang, Duk-Hyun; Song, Jae-Kwan

    2007-09-01

    Left ventricular (LV) remodeling and predictors of LV systolic function late after closure of patent ductus arteriosus (PDA) in adults remain to be clearly demonstrated. In 45 patients with PDA, including 28 patients who received successful occlusion using the Amplatzer device (AD group) (AGA, Golden Valley, MN) and 17 patients who received surgical closure (OP group), echocardiography studies were performed before closure and 1 day (AD group) or within 7 days (OP group) after closure, and then were repeated at > or = 6 months (17 +/- 13 months). In both groups, LV ejection fraction (EF) and end-diastolic volume index were significantly decreased immediately after closure, whereas end-systolic volume index did not change. During the long-term follow-up period, end-systolic as well as end-diastolic volume indices decreased significantly in both groups and LV EF recovered compared to the immediate postclosure state. However, LV EF remained low compared to the preclosure state. Five patients (11.1%) including 3 patients in the AD group and 2 patients in the OP group showed persistent late LV systolic dysfunction (EF or = 62% had a sensitivity of 72% and a specificity of 83% for predicting late normal LV EF after closure. Left ventricular EF remains low late after PDA closure compared with preclosure state in adults. Preclosure LV EF is the best index to predict late postclosure LV EF.

  13. Underestimation of Severity of Previous Whiplash Injuries

    Science.gov (United States)

    Naqui, SZH; Lovell, SJ; Lovell, ME

    2008-01-01

    INTRODUCTION We noted a report that more significant symptoms may be expressed after second whiplash injuries by a suggested cumulative effect, including degeneration. We wondered if patients were underestimating the severity of their earlier injury. PATIENTS AND METHODS We studied recent medicolegal reports, to assess subjects with a second whiplash injury. They had been asked whether their earlier injury was worse, the same or lesser in severity. RESULTS From the study cohort, 101 patients (87%) felt that they had fully recovered from their first injury and 15 (13%) had not. Seventy-six subjects considered their first injury of lesser severity, 24 worse and 16 the same. Of the 24 that felt the violence of their first accident was worse, only 8 had worse symptoms, and 16 felt their symptoms were mainly the same or less than their symptoms from their second injury. Statistical analysis of the data revealed that the proportion of those claiming a difference who said the previous injury was lesser was 76% (95% CI 66–84%). The observed proportion with a lesser injury was considerably higher than the 50% anticipated. CONCLUSIONS We feel that subjects may underestimate the severity of an earlier injury and associated symptoms. Reasons for this may include secondary gain rather than any proposed cumulative effect. PMID:18201501

  14. [Electronic cigarettes - effects on health. Previous reports].

    Science.gov (United States)

    Napierała, Marta; Kulza, Maksymilian; Wachowiak, Anna; Jabłecka, Katarzyna; Florek, Ewa

    2014-01-01

    Currently very popular in the market of tobacco products have gained electronic cigarettes (ang. E-cigarettes). These products are considered to be potentially less harmful in compared to traditional tobacco products. However, current reports indicate that the statements of the producers regarding to the composition of the e- liquids not always are sufficient, and consumers often do not have reliable information on the quality of the product used by them. This paper contain a review of previous reports on the composition of e-cigarettes and their impact on health. Most of the observed health effects was related to symptoms of the respiratory tract, mouth, throat, neurological complications and sensory organs. Particularly hazardous effects of the e-cigarettes were: pneumonia, congestive heart failure, confusion, convulsions, hypotension, aspiration pneumonia, face second-degree burns, blindness, chest pain and rapid heartbeat. In the literature there is no information relating to passive exposure by the aerosols released during e-cigarette smoking. Furthermore, the information regarding to the use of these products in the long term are not also available.

  15. Environmental analysis of closure options for waste sites at the Savannah River Plant

    International Nuclear Information System (INIS)

    Gordon, D.E.; King, C.M.; Looney, B.B.; Stephenson, D.E.; Johnson, W.F.

    1987-01-01

    Previously acceptable waste management practices (e.g., the use of unlined seepage basins) for discarding of wastes from nuclear materials production has resulted in occasional cases of groundwater contamination beneath some disposal sites, mainly in water-table aquifers. Groundwater contaminants include volatile organic compounds, heavy metals, radionuclides, and other chemicals. The closure of active and inactive waste sites that have received hazardous and/or low-level radioactive materials at the Savannah River Plant (SRP) is planned as part of an overall program to protect groundwater quality. DOE developed and submitted to Congress a groundwater protection plan for SRP. This initial plan and subsequent revisions provide the basis for closure of SRP waste sites to comply with applicable groundwater protection requirements. An environmental analysis of the closure options for the criteria waste sites that have received hazardous and/or low-level radioactive wastes was conducted to provide technical support. The several parts of this environmental analysis include description of geohydrologic conditions; determination of waste inventories; definition of closure options; modeling of environmental pathways; assessment of risk; and analysis of project costs. Each of these components of the overall analysis is described in turn in the following paragraphs. Production operations at SRP have generated a variety of solid, hazardous, and low-level radioactive waste materials. Several locations onplant have been used as waste disposal sites for solid and liquid wastes. Seventy-six individual waste sites at 45 distinct geographical locations on SRP have received hazardous, low-level radioactive, or mixed wastes. These waste sites can be categorized into 26 groupings according to the function of the waste disposed. 15 refs., 6 figs., 5 tabs

  16. West Valley Demonstration Project, Waste Management Area #3 -- Closure Alternative I

    Energy Technology Data Exchange (ETDEWEB)

    Marschke, Stephen F. [Environmental Measurements Laboratory (EML), New York, NY (United States)

    2000-06-30

    The Draft Environmental Impact Statement for the completion of the West Valley Demonstration Project and closure and/or long-term management of facilities at the Western New York Nuclear Service Center divided the site into Waste Management Areas (WMAs), and for each WMA, presented the impacts associated with five potential closure alternatives. This report focuses on WMA 3 (the High-Level Waste (HLW) Storage Area (Tanks 8D-1 and 8D-2), the Vitrification Facility and other facilities) and closure Alternative I (the complete removal of all structures, systems and components and the release of the area for unrestricted use), and reestimates the impacts associated with the complete removal of the HLW tanks, and surrounding facilities. A 32-step approach was developed for the complete removal of Tanks 8D-1 and 8D-2, the Supernatant Treatment System Support Building, and the Transfer Trench. First, a shielded Confinement Structure would be constructed to reduce the shine dose rate and to control radioactivity releases. Similarly, the tank heels would be stabilized to reduce potential radiation exposures. Next, the tank removal methodology would include: 1) excavation of the vault cover soil, 2) removal of the vault roof, 3) cutting off the tank’s top, 4) removal of the stabilized heel remaining inside the tank, 5) cutting up the tank’s walls and floor, 6) removal of the vault’s walls, the perlite blocks, and vault floor, and 7) radiation surveying and backfilling the resulting hole. After the tanks are removed, the Confinement Structure would be decontaminated and dismantled, and the site backfilled and landscaped. The impacts (including waste disposal quantities, emissions, work-effort, radiation exposures, injuries and fatalities, consumable materials used, and costs) were estimated based on this 32 step removal methodology, and added to the previously estimated impacts for closure of the other facilities within WMA 3 to obtain the total impacts from

  17. Lower first permanent molars: developing better predictors of spontaneous space closure.

    Science.gov (United States)

    Teo, Terry Kuo-Yih; Ashley, Paul Francis; Derrick, Donald

    2016-02-01

    First, first permanent molars (FPMs) of poor prognosis are often planned for extraction at an 'ideal time' so that second permanent molars (SPMs) erupt favourably to replace them. However for lower FPM extractions, timing is not an accurate predictor of success. The aim of this study was to identify additional radiographic factors that could better predict the degree of spontaneous space closure of the lower SPM following FPM extraction. Data from a previous study of 127 lower SPMs from 66 patients was re-analysed by incorporating additional radiographic factors. These included calcification stage of the bifurcation of the SPM, position of the second premolar, mesial angulation of SPM in relation to the FPM, and presence of the third permanent molar. Results were analysed using ordered logistic regression. Only 58 per cent of FPMs extracted at the 'ideal time' (SPM development at Demirjian stage E) had complete space closure. The best outcomes resulted from a combination of SPMs not at Demirjian development stage G, together with the presence of mesial angulation of the SPM and presence of the third permanent molar, where 85 per cent of those cases had complete space closure. Apart from extraction timing of the FPM, consideration must also be given to the presence of the third permanent molar and angulation of the SPM in order to ensure a reliable degree of spontaneous space closure of the lower SPM. © The Author 2015. Published by Oxford University Press on behalf of the European Orthodontic Society. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  18. Evaluation of a novel trocar-site closure and comparison with a standard Carter-Thomason closure device.

    Science.gov (United States)

    del Junco, Michael; Okhunov, Zhamshid; Juncal, Samuel; Yoon, Renai; Landman, Jaime

    2014-07-01

    The aim of this study was to evaluate and compare a novel trocars-site closure device, the WECK EFx™ Endo Fascial Closure System (EFx) with the Carter-Thomason CloseSure System® (CT) for the closure of laparoscopic trocar site defects created by a 12-mm dilating trocar. We created standardized laparoscopic trocars-site abdominal wall defects in cadaver models using a standard 12-mm laparoscopic dilating trocar. Trocar defects were closed in a randomized fashion using one of the two closure systems. We recorded time and number of attempts needed for complete defect closure. In addition, we recorded the ability to maintain pneumoperitoneum, endoscopic visualization, safety, security, and facility based on the surgeon's subjective evaluations. We compared outcomes for the EFx and CT closure systems. We created 72 standardized laparoscopic trocars-site abdominal wall defects. The mean time needed for complete defect closure was 98.53 seconds (±28.9) for the EFx compared with 133.61 seconds (±54.61) for the CT (Psafety were 2.92 for EFx vs 2.19 for CT (Pvs 1.83 for EFx and CT, respectively (Pvs 2.33 for CT (P=0.022). No significant difference was observed between the EFx and the CT systems for endoscopic visualization (2.28 vs 2.50, P=0.080). In this in vitro cadaver trial, the EFx was superior in terms of time needed to complete defect closure, safety, and facility. CT was superior in terms of maintenance of pneumoperitoneum. Both systems were equal in the number of attempts needed to complete the defect closure and endoscopic visualization.

  19. Approval plans issues and innovations

    CERN Document Server

    Katz, Linda S

    2013-01-01

    How can you, as an acquisition librarians, keep current on the output of hundreds of publishers? The answer, of course, is that you cannot. For over 30 years, approval plans have been used by librarians to acquire current titles, save staff time, and build core collections. Even today, these reasons seem appropriate, as libraries try to maintain up-to-date collections and control personnel and operating budgets. However, as shown in Approval Plans: Issues and Innovations, the use of approval plans is not so simple and straightforward; their use is subject to complex procedures and policies--an

  20. Case Report: Rapid staged abdominal closure using Gore-Tex® mesh as a bridge to primary omphalocele sac closure

    Directory of Open Access Journals (Sweden)

    William C. Kethman

    2016-06-01

    Full Text Available Omphaloceles present an ongoing challenge due to significant variations in presentation and associated co-morbidities. Diverse management strategies have been described to tackle many of the fundamental challenges of closure and reconstruction of the abdominal wall – this fact demonstrates a need for increasingly individualized management options for this complex disease. We describe a novel method of rapid staged abdominal wall closure using Gore-Tex® mesh as a bridge to primary omphalocele closure in an infant with partial Pentalogy of Cantrell and giant ruptured omphalocele. This strategy can be used in management of some of the most complex abdominal wall defects.

  1. A successful environmental remediation program closure and post-closure activities (CAPCA) Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Bowers, M.H.

    1991-01-01

    The Resource Conservation and Recovery Act (RCRA) closure of eleven waste management units at the Department of Energy's (DOE's) Oak Ridge Y-12 Plant is nearing completion. The Oak Ridge Y-12 Plant is managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy under Contract DE-AC05-84OR21400. The Closure and Post Closure Program (CAPCA) has been accomplished on an accelerated schedule through the efforts of a dedicated team from several organizations. This paper relates experience gained from the program that can be of benefit on other DOE environmental remediation projects. Technical design and construction aspects, as well as project management considerations, are discussed

  2. 48 CFR 750.7105 - Approving authorities.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Extraordinary Contractual Actions To Protect Foreign Policy Interests of the United States 750.7105 Approving authorities. All authority to approve actions...

  3. Turbulence closure for mixing length theories

    Science.gov (United States)

    Jermyn, Adam S.; Lesaffre, Pierre; Tout, Christopher A.; Chitre, Shashikumar M.

    2018-05-01

    We present an approach to turbulence closure based on mixing length theory with three-dimensional fluctuations against a two-dimensional background. This model is intended to be rapidly computable for implementation in stellar evolution software and to capture a wide range of relevant phenomena with just a single free parameter, namely the mixing length. We incorporate magnetic, rotational, baroclinic, and buoyancy effects exactly within the formalism of linear growth theories with non-linear decay. We treat differential rotation effects perturbatively in the corotating frame using a novel controlled approximation, which matches the time evolution of the reference frame to arbitrary order. We then implement this model in an efficient open source code and discuss the resulting turbulent stresses and transport coefficients. We demonstrate that this model exhibits convective, baroclinic, and shear instabilities as well as the magnetorotational instability. It also exhibits non-linear saturation behaviour, and we use this to extract the asymptotic scaling of various transport coefficients in physically interesting limits.

  4. Don’t call it a closure!

    CERN Document Server

    Rosaria Marraffino

    2015-01-01

    During the Laboratory’s annual closure, some members of the personnel joined their families, others seized the chance to travel the world. The Restaurants were closed, the corridors were dark and the heating was turned off in most of the buildings. However, a lot of people spent the Christmas break working on site and the Bulletin would like to dedicate this first article of the new year to them all!   In the CERN Control Centre (CCC), each shift had two people in position to guarantee regular 24/7 service and to intervene in case of need. Gildas Langlois and Rodolphe Maillet, CCC operators from the Beams Department, spent Christmas Eve there and celebrated it with a cake. “I volunteered to work during the holidays in order to allow colleagues to stay with their families,” says Maillet. On New Year’s Eve, it was Julien Pache and Jean-Michel Nonglaton’s turn to spend the night at work. They had a nice dinner with a CCC-made fondue and some desse...

  5. Early closure of postinfarction ventricular septal defects.

    Science.gov (United States)

    Martinelli, Luigi; Dottori, Vincenzo; Caputo, Enrico; Graffigna, Angelo; Pederzolli, Carlo

    2003-05-01

    According to the guidelines of the American College of Cardiology/American Heart Association early closure of postinfarction septal defects is now a class I indication although it still carries a relevant morbidity and mortality. The operative risk is related both to the critical hemodynamic conditions of the patient and to the technical difficulties posed by the friable tissue of the infarcted area. The most recent techniques involving the use of pericardial patches reinforced by acrylic glue have significantly reduced the hospital mortality. The aim of this study was to discuss the reliability of an aggressive, tissue-sparing surgical approach to this complication. We present a consecutive series of 12 patients operated upon between January 1998 and October 2001 within 12 hours of the onset of clinical evidence of postinfarction septal rupture. Repair was achieved with minimal septal debridement and the use of a large pericardial patch reinforced by a biological glue. Three cases of dehiscence required early reoperation with no hospital mortality. This procedure is technically feasible and allows early aggressive treatment of postinfarction septal rupture with satisfactory results.

  6. IT Services availability during CERN annual closure

    CERN Multimedia

    2003-01-01

    Mail, Cern Windows (NICE ),  Web services,  LXPLUS, LXBATCH, Automated tape devices, Castor, Backups, software license servers, Sundev, CVS and Print Servers, CDS and Agenda-Maker, EDMS (in collaboration with EST Division), CMS disc servers, Campus Network,  Remedy, Security and VPN services will be available during the CERN annual closure. The physics database cluster, replication location service as well as accdb, cerndb and admsdb are the only databases available, CCDB will be closed for public access. Problems developing on scheduled services should be addressed within about half a day except around  Christmas Eve and Christmas Day ( 24 and 25th December ) and New Year's Eve and New Years Day (31st December and 1st Janauary. All other services will be left running mostly unattended. No interruptions are scheduled but restoration of the service in case of failure cannot be guaranteed. Please note that the Helpdesk will be closed, that no file restores from backups will be possible and damaged tapes wi...

  7. Transcatheter Closure of Patent Foramen Ovale: A Single Center Experience

    Directory of Open Access Journals (Sweden)

    Ivan Milev

    2016-10-01

    CONCLUSIONS: Percutaneous transcatheter closure of PFO is a safe and effective procedure showing mid-term relief of neurological symptoms in patients as well as significant reduction of migraine symptoms.

  8. 300 Area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999

  9. 300 Area waste acid treatment system closure plan. Revision 1

    International Nuclear Information System (INIS)

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan

  10. IDP camp closure and gender inequality in Timor-Leste

    Directory of Open Access Journals (Sweden)

    Phyllis Ferguson

    2010-02-01

    Full Text Available The goal of humanitarian assistance in Timor-Leste during a seriesof crises from 2006 to 2008 became increasingly focused on IDPcamp closure, with the assisted return of IDPs to their communitiesor to alternative living situations.

  11. 40 CFR 265.112 - Closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination necessary to satisfy the closure performance standard; and (5) A detailed...

  12. 40 CFR 264.112 - Closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standard; and (5) A detailed...

  13. Economic evaluation of closure cap barrier materials study

    Energy Technology Data Exchange (ETDEWEB)

    Serrato, M.G.; Bhutani, J.S.; Mead, S.M.

    1993-09-01

    Volume II of the Economic Evaluation of the Closure Cap Barrier Materials, Revision I contains detailed cost estimates for closure cap barrier materials. The cost estimates incorporate the life cycle costs for a generic hazardous waste seepage basin closure cap under the RCRA Post Closure Period of thirty years. The economic evaluation assessed six barrier material categories. Each of these categories consists of several composite cover system configurations, which were used to develop individual cost estimates. The information contained in this report is not intended to be used as a cost estimating manual. This information provides the decision makers with the ability to screen barrier materials, cover system configurations, and identify cost-effective materials for further consideration.

  14. Economic evaluation of closure cap barrier materials study

    International Nuclear Information System (INIS)

    Serrato, M.G.; Bhutani, J.S.; Mead, S.M.

    1993-09-01

    Volume II of the Economic Evaluation of the Closure Cap Barrier Materials, Revision I contains detailed cost estimates for closure cap barrier materials. The cost estimates incorporate the life cycle costs for a generic hazardous waste seepage basin closure cap under the RCRA Post Closure Period of thirty years. The economic evaluation assessed six barrier material categories. Each of these categories consists of several composite cover system configurations, which were used to develop individual cost estimates. The information contained in this report is not intended to be used as a cost estimating manual. This information provides the decision makers with the ability to screen barrier materials, cover system configurations, and identify cost-effective materials for further consideration

  15. Limited utility of preoperative studies in preparation for colostomy closure.

    Science.gov (United States)

    Pokorny, R M; Heniford, T; Allen, J W; Tuckson, W B; Galandiuk, S

    1999-04-01

    Numerous diagnostic and therapeutic practices are used in an attempt to reduce the morbidity of colostomy closures. Our principal aim was to evaluate the role of preoperative studies, specifically barium enemas and endoscopic examinations, performed before colostomy closures. Additionally, we wished to identify other practices involved in the perioperative management of patients undergoing colostomy closure that influenced morbidity. The records of 100 consecutive patients who underwent elective colostomy closure at University of Louisville Hospital between January 1989 and July 1995 were reviewed. Wound infection was the most common complication (12%). Various bowel preparations were equivalent in efficacy and did not influence the complication rate. Intermittent wound irrigation with antibiotics for 3 days postoperatively, via subcutaneous drains, was associated with a low incidence of incision infection. Preoperative barium enema or sigmoidoscopy were often performed but rarely useful. Performing these examinations merely increased hospital cost without a corresponding decline in morbidity.

  16. Guidance for closure of existing DOE LLW disposal sites

    International Nuclear Information System (INIS)

    Blanchfield, L.

    1987-01-01

    During FY 1986, a closure guidance document was developed. The purpose of this document is to provide guidance in support of DOE Order 5820.2 to site operating contractors for the stabilization and closure of existing low-level waste (LLW) shallow land disposal sites at US Department of Energy (DOE) facilities. Guidance is provided to aid operators in placing existing LLW sites in a closed conditions, i.e., a condition in which a nonoperational site meets postclosure performance requirements and can be shown, within a high degree of confidence, to perform as anticipated in the future, under the most cost-effective maintenance approach. Guidance is based on the philosophy that closure should be planned and performed using a systems approach. Plans for FY 1987 call for revision of the document to incorporate more information on closure of LLW sites also containing radioactive mixed waste and/or transuranic waste. 4 references, 3 figures, 2 tables

  17. LLNL/YMP Waste Container Fabrication and Closure Project

    International Nuclear Information System (INIS)

    1990-10-01

    The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) Program is studying Yucca Mountain, Nevada as a suitable site for the first US high-level nuclear waste repository. Lawrence Livermore National Laboratory (LLNL) has the responsibility for designing and developing the waste package for the permanent storage of high-level nuclear waste. This report is a summary of the technical activities for the LLNL/YMP Nuclear Waste Disposal Container Fabrication and Closure Development Project. Candidate welding closure processes were identified in the Phase 1 report. This report discusses Phase 2. Phase 2 of this effort involved laboratory studies to determine the optimum fabrication and closure processes. Because of budget limitations, LLNL narrowed the materials for evaluation in Phase 2 from the original six to four: Alloy 825, CDA 715, CDA 102 (or CDA 122) and CDA 952. Phase 2 studies focused on evaluation of candidate material in conjunction with fabrication and closure processes

  18. Autocracy bias in informal groups under need for closure.

    Science.gov (United States)

    Pierro, Antonio; Mannetti, Lucia; De Grada, Eraldo; Livi, Stefano; Kruglanski, Arie W

    2003-03-01

    Two experiments investigated the tendency of groups with members under high (vs. low) need for cognitive closure to develop an autocratic leadership structure in which some members dominate the discussion, constitute the "hubs" of communication, and influence the group more than other members. The first experiment found that high (vs. low) need for closure groups, as assessed via dispositional measure of the need for closure, manifested greater asymmetry of conversational floor control, such that members with autocratic interactional style were more conversationally dominant and influential than less autocratic members. The second experiment manipulated the need for closure via time pressure and utilized a social network analysis. Consistent with expectation, groups under time pressure (vs. no pressure) showed a greater asymmetry of participation, of centrality, and of prestige among the group members, such that the more focal members were perceived to exert the greater influence over the groups' decisions.

  19. Procedures adopted by orthodontists for space closure and anchorage control

    Directory of Open Access Journals (Sweden)

    André da Costa Monini

    2013-12-01

    Full Text Available OBJECTIVE: The aim of this study was to identify the procedures adopted by Brazilian orthodontists in the following situations: extraction space closure, anchorage control in case of necessary anchorage for group A and frequency of skeletal anchorage use, especially in the upper jaw. METHOD: A questionnaire was sent to the e-mail address of all dentists registered in the Brazilian Federal Council of Dentistry. RESULTS: The results showed that most Brazilian orthodontists usually perform extraction space closure by means of sliding mechanics. The use of palatal bar, inclusion of second molars in the archwire and space closure performed in two phases are the most used techniques for anchorage control in the upper jaw. The skeletal anchorage is referenced by 36.5% of specialists as a routine practice for the upper jaw anchorage. CONCLUSIONS: There is a wide variety of procedures adopted by Brazilian orthodontists for orthodontic space closure and anchorage control.

  20. Procedures adopted by orthodontists for space closure and anchorage control.

    Science.gov (United States)

    Monini, André da Costa; Gandini Júnior, Luiz Gonzaga; dos Santos-Pinto, Ary; Maia, Luiz Guilherme Martins; Rodrigues, Willian Caetano

    2013-01-01

    The aim of this study was to identify the procedures adopted by Brazilian orthodontists in the following situations: extraction space closure, anchorage control in case of necessary anchorage for group A and frequency of skeletal anchorage use, especially in the upper jaw. A questionnaire was sent to the e-mail address of all dentists registered in the Brazilian Federal Council of Dentistry. The results showed that most Brazilian orthodontists usually perform extraction space closure by means of sliding mechanics. The use of palatal bar, inclusion of second molars in the archwire and space closure performed in two phases are the most used techniques for anchorage control in the upper jaw. The skeletal anchorage is referenced by 36.5% of specialists as a routine practice for the upper arch anchorage. There is a wide variety of procedures adopted by Brazilian orthodontists for orthodontic space closure and anchorage control.

  1. Patent Foramen Ovale Closure or Antiplatelet Therapy for Cryptogenic Stroke

    DEFF Research Database (Denmark)

    Søndergaard, Lars; Kasner, Scott E; Rhodes, John F

    2017-01-01

    BACKGROUND: The efficacy of closure of a patent foramen ovale (PFO) in the prevention of recurrent stroke after cryptogenic stroke is uncertain. We investigated the effect of PFO closure combined with antiplatelet therapy versus antiplatelet therapy alone on the risks of recurrent stroke and new...... brain infarctions. METHODS: In this multinational trial involving patients with a PFO who had had a cryptogenic stroke, we randomly assigned patients, in a 2:1 ratio, to undergo PFO closure plus antiplatelet therapy (PFO closure group) or to receive antiplatelet therapy alone (antiplatelet-only group......). Imaging of the brain was performed at the baseline screening and at 24 months. The coprimary end points were freedom from clinical evidence of ischemic stroke (reported here as the percentage of patients who had a recurrence of stroke) through at least 24 months after randomization and the 24-month...

  2. Stress analysis of closure bolts for shipping casks

    International Nuclear Information System (INIS)

    Mok, G.C.; Fischer, L.E.; Hsu, S.T.

    1993-01-01

    This report specifies the requirements and criteria for stress analysis of closure bolts for shipping casks containing nuclear spent fuels or high level radioactive materials. The specification is based on existing information conceming the structural behavior, analysis, and design of bolted joints. The approach taken was to extend the ASME Boiler and Pressure Vessel Code requirements and criteria for bolting analysis of nuclear piping and pressure vessels to include the appropriate design and load characteristics of the shipping cask. The characteristics considered are large, flat, closure lids with metal-to-metal contact within the bolted joint; significant temperature and impact loads; and possible prying and bending effects. Specific formulas and procedures developed apply to the bolt stress analysis of a circular, flat, bolted closure. The report also includes critical load cases and desirable design practices for the bolted closure, an in-depth review of the structural behavior of bolted joints, and a comprehensive bibliography of current information on bolted joints

  3. 300 Area waste acid treatment system closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  4. Suction Cup Induced Palatal Fistula: Surgical Closure by Palatal ...

    African Journals Online (AJOL)

    1Department of Pediatrics, Pragna Children's Hospital, Hyderabad, ... Eluru, 4Department of Conservative Dentistry and Endodontics, KIMS Dental College and ... The surgical closure of palatal fistula planned under general anesthesia.

  5. Review on improved seismic imaging with closure phase

    KAUST Repository

    Schuster, Gerard T.; Huang, Yunsong; Hanafy, Sherif M.; Zhou, Min; Yu, Jianhua; Alhagan, Ola; Dai, Wei

    2014-01-01

    remedy this problem, we comprehensively reviewed inverting differential traveltimes that satisfied the closure-phase condition. The result is that the source and receiver statics are completely eliminated in the data and velocities far from the target do

  6. 300 Area waste acid treatment system closure plan

    Energy Technology Data Exchange (ETDEWEB)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.

  7. Closure Report for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2008-01-01

    The purpose of this Closure Report is to provide a summary of the completed closure activities, to document waste disposal, and to present information confirming that the remediation goals were met. The closure alternatives consisted of closure in place with administrative controls for one CAS, and no further action with implementation of best management practices (BMPs) for the remaining five CASs

  8. Drugs Approved for Esophageal Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for esophageal cancer. The list includes generic names and brand names. The drug names link to NCI's Cancer Drug Information summaries.

  9. Drugs Approved for Liver Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for liver cancer. The list includes generic names and brand names. The drug names link to NCI’s Cancer Drug Information summaries.

  10. Drugs Approved for Kaposi Sarcoma

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for Kaposi sarcoma. The list includes generic names and brand names. The drug names link to NCI's Cancer Drug Information summaries.

  11. Drugs Approved for Pancreatic Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for pancreatic cancer. The list includes generic names, brand names, and common drug combinations, which are shown in capital letters.

  12. Drugs Approved for Vaginal Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) to prevent vaginal cancer. The list includes generic names and brand names. The drug names link to NCI’s Cancer Drug Information summaries.

  13. Drugs Approved for Skin Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for skin cancer. The list includes generic names and brand names. The drug names link to NCI's Cancer Drug Information summaries.

  14. Drugs Approved for Vulvar Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for vulvar cancer. The list includes generic names and brand names. The drug names link to NCI's Cancer Drug Information summaries.

  15. Drugs Approved for Wilms Tumor

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for Wilms tumor and other childhood kidney cancers. The list includes generic names and brand names. The drug names link to NCI's Cancer Drug Information summaries.

  16. Drugs Approved for Lung Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for lung cancer. The list includes generic names, brand names, and common drug combinations, which are shown in capital letters.

  17. Drugs Approved for Bone Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for bone cancer. The list includes generic names and brand names. The drug names link to NCI's Cancer Drug Information summaries.

  18. Drugs Approved for Malignant Mesothelioma

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for malignant mesothelioma. The list includes generic names and brand names. The drug names link to NCI's Cancer Drug Information summaries.

  19. Drugs Approved for Penile Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for penile cancer. The list includes generic names and brand names. The drug names link to NCI’s Cancer Drug Information summaries.

  20. Drugs Approved for Bladder Cancer

    Science.gov (United States)

    This page lists cancer drugs approved by the Food and Drug Administration (FDA) for bladder cancer. The list includes generic names, brand names, and common drug combinations, which are shown in capital letters.