WorldWideScience

Sample records for previous activity maintenance

  1. Maintenance of Physical Activity among Faculty and Staff in University Settings

    Science.gov (United States)

    Whipple, Kerry; Kinney, Judy; Kattenbraker, Mark

    2008-01-01

    Previous studies have placed little emphasis on maintenance of healthy behaviors longer than six months. This study examined factors that contribute to maintenance of physical activity among faculty and staff in university settings. A 55-item survey on physical activity maintenance was used to assess attitudes towards exercise, exercise…

  2. Physical activity maintenance in patients with rheumatoid arthritis

    DEFF Research Database (Denmark)

    Loeppenthin, K; Esbensen, Bente Appel; Østergaard, Mikkel

    2014-01-01

    OBJECTIVE: To describe the experience of physical activity maintenance in patients with rheumatoid arthritis. DESIGN: A qualitative salutogenic-oriented interview study. SETTING: A rheumatology outpatient clinic. SUBJECTS: A purposive sample of 16 physically active patients (mean age 50, range 37...... with non-arthritis populations. CONCLUSION: This study demonstrates that physical activity in patients with rheumatoid arthritis may be understood as a resource to resist disability and to feel and stay healthy while creating and sustaining meaningfulness in life.......-67) diagnosed with rheumatoid arthritis on average 21 years previously (range 4-46 years). METHODS: In-depth interviews were conducted using a semi-structured interview guide to illuminate how the phenomenon 'physical activity maintenance' was experienced by patients with rheumatoid arthritis. The interviews...

  3. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  4. Summary of typical routine maintenance activities at Tokai Reprocessing Plant. Supplement (March, 2002)

    International Nuclear Information System (INIS)

    2002-03-01

    Typical maintenance activities, such as replacement of worn out parts and cleaning of filter elements, routinely performed during steady operation are summarized. [The Summary of Typical Routine Maintenance Activities at Tokai Reprocessing Plant] (JNC TN 8450 2001-006) was already prepared in September, 2001. The purpose of this summary is to give elementary understanding on these activities to people who are responsible for explanation them to the public. At this time, the same kind of summary is prepared as a supplement of the previous one. (author)

  5. Novel Biomarkers of Physical Activity Maintenance in Midlife Women: Preliminary Investigation

    Directory of Open Access Journals (Sweden)

    Kelly A. Bosak

    2018-04-01

    Full Text Available The precision health initiative is leading the discovery of novel biomarkers as important indicators of biological processes or responses to behavior, such as physical activity. Neural biomarkers identified by magnetic resonance imaging (MRI hold promise to inform future research, and ultimately, for transfer to the clinical setting to optimize health outcomes. This study investigated resting-state and functional brain biomarkers between midlife women who were maintaining physical activity in accordance with the current national guidelines and previously acquired age-matched sedentary controls. Approval was obtained from the Human Subjects Committee. Participants included nondiabetic, healthy weight to overweight (body mass index 19–29.9 kg/m2 women (n = 12 aged 40–64 years. Control group data were used from participants enrolled in our previous functional MRI study and baseline resting-state MRI data from a subset of sedentary (<500 kcal of physical activity per week midlife women who were enrolled in a 9-month exercise intervention conducted in our imaging center. Differential activation of the inferior frontal gyrus (IFG and greater connectivity with the dorsolateral prefrontal cortex (dlPFC was identified between physically active women and sedentary controls. After correcting for multiple comparisons, these differences in biomarkers of physical activity maintenance did not reach statistical significance. Preliminary evidence in this small sample suggests that neural biomarkers of physical activity maintenance involve activations in the brain region associated with areas involved in implementing goal-directed behavior. Specifically, activation of the IFG and connectivity with the dlPFC is identified as a neural biomarker to explain and predict long-term physical activity maintenance for healthy aging. Future studies should evaluate these biomarker links with relevant clinical correlations.

  6. A Dynamic Policy for Grouping Maintenance Activities

    NARCIS (Netherlands)

    R.E. Wildeman (Ralph); R. Dekker (Rommert); A.C.J.M. Smit

    1995-01-01

    textabstractA maintenance activity carried out on a technical system often involves a system-dependent set-up cost that is the same for all maintenance activities carried out on that system. Grouping activities thus saves costs since execution of a group of activities requires only one set-up. Many

  7. Performing maintenance activities on-line a risk perspective

    International Nuclear Information System (INIS)

    Darling, S.S.; Mairs, T.P.

    1993-01-01

    The US nuclear power industry is attempting to deal with the issue of optimizing the performance of maintenance activities with the advent of the maintenance rule. The impact of any maintenance activity on the safe operation of a nuclear power facility can be quantified on the basis of risk. Therefore, it is incumbent upon the industry to accommodate the regulator and present a maintenance optimization program in terms that explicitly address the potential risk inherent in its concept and implementation. The motivation for utilities to perform maintenance while the plant is operating (i.e., on-line) is readily perceived to offer the following advantages: 1. greater system availability; 2. higher plant capacity factor; 3. more evenly distributed workload for the maintenance department; and 4. overall safer plant operation. However, risks inherent in undertaking maintenance activities during power operation could amount to the realization that reapportionment of these tasks is not cost-beneficial. Therefore, it is important that any utility considering implementing such a paradigm in maintenance philosophy establish a rigorous process to select, perform, and monitor maintenance tasks performed while operating

  8. Activities of maintenance and outage

    International Nuclear Information System (INIS)

    Gracia-Orellan, J. M.; Gonzalez, P. L.; Verdu, M. F.; Fernandez, J. A.

    2004-01-01

    Iberinco Nuclear Generation Department have wanted to promote service activities in nuclear power plants for years besides its dedication to engineering activities. for it, in 1997 Nuclear Services Management was created to complement engineering activities and to be able to make an offer for products and turn key services. People involved in this Management have an extensive experience in Services Area, so that all type of maintenance works are promoted, as well other services like dismantling, fallout management and new equipment's for nuclear power plants services. Iberinco's experience in Support Services in Nuclear Power Plants allows to answer effectively to special workers during operation cycle and outages periods. These activities have been made in spanish nuclear power plants and Angra I and II plants, both of them in Brazil. In this area we provide Technical Consulting Management and Supervision to develop the following activities: - Improvement Maintenance Programs based in PSA: Implantation of Maintenance Rule in the plants. - Supervision and Assembly of design modifications in structures, systems and components. - Fulfilment of efficiency tests, inspection and turbo-group modification. - Noise and vibrations analysis. - Valves and rotative equipment calculations and diagnosis tests. Iberinco develop these outage activities itself or as contractors coordinator under its management. A lot of them have been working with Iberinco for many years and have a great experience in the Service Area they are developing. In this article, the main outage activities developed for Iberinco are detailed. (Author)

  9. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  10. Environmental favourable foundries through maintenance activities

    Directory of Open Access Journals (Sweden)

    A. Saniuk

    2015-10-01

    Full Text Available Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help to reduce losses and thereby improve the efficiency of the processes used in the production of resources (e.g. raw materials, energy, etc., especially in areas such as: the choice of an appropriate strategy for the maintenance of machinery and equipment (e.g. reactive, preventive, proactive; inventory management of spare parts; lubrication management and management of technology media.

  11. Overview of maintenance principles and regulatory supervision of maintenance activities at nuclear power plants in Slovakia

    International Nuclear Information System (INIS)

    Rohar, S.; Cepcek, S.

    1997-01-01

    The maintenance represents one of the most important tools to ensure safe and reliable operation of nuclear power plants. The emphasis of Nuclear Regulatory Authority of the Slovak Republic to the maintenance issue is expressed by requirements in the regulations. The current practice of maintenance management in operated nuclear power plants in Slovak Republic is presented. Main aspects of maintenance, as maintenance programme, organization of maintenance, responsibilities for maintenance are described. Activities of nuclear regulatory authority in maintenance process are presented too. (author)

  12. New activities in nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Mico, F.; Specht, J.

    2006-01-01

    This article addresses the consequences of the progressive deregulation of the electricity market of several key countries on the maintenance practices and techniques face to the growing pressures on O and M costs. The responses of the nuclear maintenance industry to make maintenance activities more efficient maintaining if not enhancing the safety of NPP's are briefly described. The article also analyses the potential impact of shortage of experience maintenance personnel to serve the NPP's in the future as some countries are already experiencing. (Author)

  13. Perceived benefits and barriers to leisure-time physical activity during pregnancy in previously inactive and active women.

    Science.gov (United States)

    Da Costa, Deborah; Ireland, Kierla

    2013-01-01

    This study compared perceived benefits and barriers to leisure-time physical activity during pregnancy among women who were insufficiently active or inactive before pregnancy. Eighty-two pregnant women completed questionnaires assessing leisure-time physical activity benefits/barriers, exercise self-efficacy, social support, depressed mood, pre-pregnancy and current physical activity and fatigue. Multivariable regression analyses identified factors associated with exercise benefits/barriers for the two pre-pregnancy leisure-time physical activity groups. Both pre-pregnancy leisure-time physical activity groups reported more benefits than barriers to exercise during pregnancy. Previously inactive women reported fewer perceived benefits and greater perceived barriers to leisure-time physical activity during pregnancy. Higher self-efficacy for exercise during pregnancy was significantly associated with greater benefits of leisure-time physical activity during pregnancy for both groups. Less family support for exercise and lower self-efficacy for exercise were significantly related to greater leisure-time physical activity barriers during pregnancy for previously inactive women. Lower self-efficacy for exercise, higher depressed mood scores, and younger age were associated with greater leisure-time physical activity barriers for active women. Findings suggest that the intensities of perceived leisure-time physical activity benefits and barriers during pregnancy differ for women, depending on their pre-pregnancy leisure-time physical activity status. Consideration of pre-pregnancy leisure-time physical activity status may thus be important when tailoring strategies to overcome barriers to promote initiation and maintenance of physical activity during pregnancy.

  14. Regulatory oversight of maintenance activities at nuclear power plants

    International Nuclear Information System (INIS)

    Pape, M.

    1997-01-01

    Regulation of nuclear safety in the UK is based on monitoring of compliance with licence conditions. This paper discusses legislation aspects, license conditions, license requirements for maintenance and maintenance activities in the UK. It also addresses the regulator utility interaction, the regulatory inspection of maintenance and the trends in maintenance. (author)

  15. Human area MT+ shows load-dependent activation during working memory maintenance with continuously morphing stimulation.

    Science.gov (United States)

    Galashan, Daniela; Fehr, Thorsten; Kreiter, Andreas K; Herrmann, Manfred

    2014-07-11

    Initially, human area MT+ was considered a visual area solely processing motion information but further research has shown that it is also involved in various different cognitive operations, such as working memory tasks requiring motion-related information to be maintained or cognitive tasks with implied or expected motion.In the present fMRI study in humans, we focused on MT+ modulation during working memory maintenance using a dynamic shape-tracking working memory task with no motion-related working memory content. Working memory load was systematically varied using complex and simple stimulus material and parametrically increasing retention periods. Activation patterns for the difference between retention of complex and simple memorized stimuli were examined in order to preclude that the reported effects are caused by differences in retrieval. Conjunction analysis over all delay durations for the maintenance of complex versus simple stimuli demonstrated a wide-spread activation pattern. Percent signal change (PSC) in area MT+ revealed a pattern with higher values for the maintenance of complex shapes compared to the retention of a simple circle and with higher values for increasing delay durations. The present data extend previous knowledge by demonstrating that visual area MT+ presents a brain activity pattern usually found in brain regions that are actively involved in working memory maintenance.

  16. Regulatory control of maintenance activities in Argentine nuclear power plants

    International Nuclear Information System (INIS)

    Calvo, J.C.; Caruso, G.

    2000-01-01

    The main maintenance objective is to assure that the safety features of structures, components and systems of nuclear power plants are kept as designed. Therefore, there is a direct relationship between safety and maintenance. Owing to the above mentioned, maintenance activities are considered a relevant regulatory issue for the Argentine Nuclear Regulatory Authority (ARN). This paper describes the regulatory control to maintenance activities of Argentine nuclear power plants. It also addresses essential elements for maintenance control, routine inspections, special inspections during planned outages, audits and license conditions and requirements. (author)

  17. Forecasts of the Maintenance Activity

    Directory of Open Access Journals (Sweden)

    Marius Romocea

    2017-11-01

    Full Text Available Enhancing the machines’ technical and technological performance through constructive improvements that allow for the automation of orders, contributes to the increasing of the production capacity of the system and for maintaining an optimal level of product costs. In order to achieve these goals, it is necessary to organize the maintenance work well, in order to quickly diagnose the malfunctions and to shorten the repair time. Given the scale of the phenomena, this paper seeks to answer two questions, namely: how will be the maintenance in future and also how to prepare this activity.

  18. Basic Characteristics of Human Erroneous Actions during Test and Maintenance Activities Leading to Unplanned Reactor Trips

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Park, Jin Kyun

    2010-01-01

    Test and maintenance (T and M) activities of nuclear power plants are essential for sustaining the safety of a power plant and maintaining the reliability of plant systems and components. However, the potential of human errors during T and M activities has also the potential to induce unplanned reactor trips or power derate or making safety-related systems unavailable. According to the major incident/accident reports of nuclear power plants in Korea, contribution of human errors takes up about 20% of the total events. The previous study presents that most of human-related unplanned reactor trip events during normal power operation are associated with T and M activities (63%), which are comprised of plant maintenance activities such as a 'periodic preventive maintenance (PPM)', a 'planned maintenance (PM)' and a 'corrective maintenance (CM)'. This means that T and M activities should be a major subject for reducing the frequency of human-related unplanned reactor trips. This paper aims to introduce basic characteristics of human erroneous actions involved in the test and maintenance-induced unplanned reactor trip events that have occurred between 1986 and 2006 in Korean nuclear power plants. The basic characteristics are described by dividing human erroneous actions into planning-based errors and execution-based errors. For the events associated with planning failures, they are, firstly, classified according to existence of the work procedure and then described for what aspects of the procedure or work plan have deficiency or problem. On the other hand, for the events associated with execution failures, they are described from the aspect of external error modes

  19. Use of probabilistic risk assessment in maintenance activities at Palo Verde

    International Nuclear Information System (INIS)

    Lindquist, R.C.; Pobst, D.S.

    1993-01-01

    Probabilistic risk assessment (PRA) is an important tool in addressing various maintenance activities. At the Palo Verde nuclear generating station (PVNGS), the PRA has been used in a variety of ways to support a wide and diverse selection of maintenance-related activities. For on-line or at-power maintenance, the PRA was used to evaluate combinations of maintenance activities possible with the 12-week or floating maintenance schedule. The maintenance schedule was evaluated to identify any higher risk, undesirable combinations of equipment outages, such as the sole steam-driven auxiliary feedwater pump and the same train emergency diesel generator. Table I is a sampling of the results from the maintenance schedule evaluation in terms of increase in conditional core damage frequency (CDF) above the base- line value due to maintenance on some important key safety systems and combinations thereof. The baseline CDF is 7.4 x 10 -7 per 72 h

  20. Building Maintenance. Math Learning Activity Packet.

    Science.gov (United States)

    Grant, Shelia I.

    This collection of learning activities is intended for use in reinforcing mathematics instruction as it relates to building maintenance. Fifty activity sheets are provided. These are organized into units on the following topics: numeration, adding whole numbers, subtracting whole numbers, multiplying whole numbers, dividing whole numbers,…

  1. Brain Activation during Associative Short-Term Memory Maintenance is Not Predictive for Subsequent Retrieval

    Directory of Open Access Journals (Sweden)

    Heiko eBergmann

    2015-09-01

    Full Text Available Performance on working memory (WM tasks may partially be supported by long-term memory (LTM processing. Hence, brain activation recently being implicated in WM may actually have been driven by (incidental LTM formation. We examined which brain regions actually support successful WM processing, rather than being confounded by LTM processes, during the maintenance and probe phase of a WM task. We administered a four-pair (faces and houses associative delayed-match-to-sample (WM task using event-related fMRI and a subsequent associative recognition LTM task, using the same stimuli. This enabled us to analyze subsequent memory effects for both the WM and the LTM test by contrasting correctly recognized pairs with incorrect pairs for either task. Critically, with respect to the subsequent WM effect, we computed this analysis exclusively for trials that were forgotten in the subsequent LTM recognition task. Hence, brain activity associated with successful WM processing was less likely to be confounded by incidental LTM formation. The subsequent LTM effect, in contrast, was analyzed exclusively for pairs that previously had been correctly recognized in the WM task, disclosing brain regions involved in successful LTM formation after successful WM processing. Results for the subsequent WM effect showed no significantly activated brain areas for WM maintenance, possibly due to an insensitivity of fMRI to mechanisms underlying active WM maintenance. In contrast, a correct decision at WM probe was linked to activation in the retrieval success network (anterior and posterior midline brain structures. The subsequent LTM analyses revealed greater activation in left dorsolateral prefrontal cortex and posterior parietal cortex in the early phase of the maintenance stage. No supra-threshold activation was found during the WM probe. Together, we obtained clearer insights in which brain regions support successful WM and LTM without the potential confound of the

  2. Brain activation during associative short-term memory maintenance is not predictive for subsequent retrieval.

    Science.gov (United States)

    Bergmann, Heiko C; Daselaar, Sander M; Beul, Sarah F; Rijpkema, Mark; Fernández, Guillén; Kessels, Roy P C

    2015-01-01

    Performance on working memory (WM) tasks may partially be supported by long-term memory (LTM) processing. Hence, brain activation recently being implicated in WM may actually have been driven by (incidental) LTM formation. We examined which brain regions actually support successful WM processing, rather than being confounded by LTM processes, during the maintenance and probe phase of a WM task. We administered a four-pair (faces and houses) associative delayed-match-to-sample (WM) task using event-related functional MRI (fMRI) and a subsequent associative recognition LTM task, using the same stimuli. This enabled us to analyze subsequent memory effects for both the WM and the LTM test by contrasting correctly recognized pairs with incorrect pairs for either task. Critically, with respect to the subsequent WM effect, we computed this analysis exclusively for trials that were forgotten in the subsequent LTM recognition task. Hence, brain activity associated with successful WM processing was less likely to be confounded by incidental LTM formation. The subsequent LTM effect, in contrast, was analyzed exclusively for pairs that previously had been correctly recognized in the WM task, disclosing brain regions involved in successful LTM formation after successful WM processing. Results for the subsequent WM effect showed no significantly activated brain areas for WM maintenance, possibly due to an insensitivity of fMRI to mechanisms underlying active WM maintenance. In contrast, a correct decision at WM probe was linked to activation in the "retrieval success network" (anterior and posterior midline brain structures). The subsequent LTM analyses revealed greater activation in left dorsolateral prefrontal cortex and posterior parietal cortex in the early phase of the maintenance stage. No supra-threshold activation was found during the WM probe. Together, we obtained clearer insights in which brain regions support successful WM and LTM without the potential confound of

  3. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  4. Autonomous and professional maintenance in metallurgical enterprise as activities within total productive maintenance

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2014-04-01

    Full Text Available The content of this publication consists of notions connected with Total Productive Maintenance (TPM in metallurgical enterprise. The basic areas of devices condition management through Autonomous and Professional Maintenance are described here. Mentioned areas of activities are performed in metallurgical enterprise ArcelorMittal Poland within pillars of World Class Manufacturing (WCM. The aims of UR programs are to maintain the basic functionality of the devices and decrease the number of failures in order to reach improvement of production efficiency.

  5. Study on application of safety checklist in preventive maintenance activities

    International Nuclear Information System (INIS)

    Shi Jin; Chen Song; Liu Jingquan

    2013-01-01

    The paper describes the principles and the characteristics of safety checklist as a risk evaluation method. Examples of application of safety checklists to preventive maintenance activities such as criteria comparison and checkup items in place in nuclear power plants are illustrated in details with issues appeared in the checklist establishment. Checklist has a good application in the RCM analysis or in the actual preventive maintenance program for Chashma Nuclear Power Plant indicated by concrete instances. In the light of safety checklist which is used to sustain preventive maintenance as a simple and applicable risk analysis approach, we can get deep knowledge of risks of nuclear power plant to perfect preventive maintenance activities. (authors)

  6. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  7. Initiating statistical maintenance optimization

    International Nuclear Information System (INIS)

    Doyle, E. Kevin; Tuomi, Vesa; Rowley, Ian

    2007-01-01

    Since the 1980 s maintenance optimization has been centered around various formulations of Reliability Centered Maintenance (RCM). Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy includes evaluation of statistical optimization techniques. A review of successful pilot efforts in this direction is provided as well as initial work with graphical analysis. The present situation reguarding data sourcing, the principle impediment to use of stochastic methods in previous years, is discussed. The use of Crowe/AMSAA (Army Materials Systems Analysis Activity) plots is demonstrated from the point of view of justifying expenditures in optimization efforts. (author)

  8. Anticipated affective consequences of physical activity adoption and maintenance.

    Science.gov (United States)

    Dunton, Genevieve Fridlund; Vaughan, Elaine

    2008-11-01

    The expected emotional consequences of future actions are thought to play an important role in health behavior change. This research examined whether anticipated affective consequences of success and failure vary across stages of physical activity change and differentially predict physical activity adoption as compared to maintenance. Using a prospective design over a 3-month period, a community sample of 329 healthy, middle-aged adults were assessed at 2 time points. Anticipated positive and negative emotions, stage of behavior change (precontemplation [PC], contemplation [C], preparation [P], action [A], maintenance [M]), and level of physical activity. At baseline, anticipated positive emotions were greater in C versus PC, whereas anticipated negative emotions were greater in M versus A and in M versus P. Higher anticipated positive but not negative emotions predicted physical activity adoption and maintenance after 3 months. Although the expected affective consequences of future success and failure differentiated among individuals in the early and later stages of physical activity change, respectively; only the anticipated affective consequences of success predicted future behavior.

  9. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  10. State of technology, system and solution supporting on-line maintenance - company's activities and products

    International Nuclear Information System (INIS)

    Nishitani, Junichi; Shimizu, Shunichi; Higasa, Hisakazu

    2010-01-01

    The new inspection system based on operator's maintenance and monitoring program of nuclear power plants was introduced in Japan more than one year ago and recommended on-line maintenance (maintenance during operation) will be carried out to increase capacity factor with safe and reliable operation of the plant. In this feature article, nine experts described the state of technology, system and solution supporting on-line maintenance - company's activities and products. These were titled as 'MHI's technology supporting on-line maintenance'. 'Technology supporting on-line maintenance - Toshiba's activities to upgrade monitoring and diagnostic service and maintenance management', 'AsahiKASEI's activities of on-line maintenance', 'Importance of information sharing of on-line maintenance and its ideal method-function of impact plan of IBM Maximo Asset Management for Nuclear', 'US's on-line maintenance and information systems', 'SmartProcedures realizing safe operation of nuclear power plant - proposal of computerized procedures', 'Ultrasonic leak detection system SDT170', 'Application of infrared thermography for equipment maintenance in nuclear power plant' and 'On-line condition monitoring system - condition eye'. (T. Tanaka)

  11. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  12. Study on how to evaluate the effectiveness of maintenance activities for giant complex plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki

    2010-01-01

    If we try to check the effectiveness of maintenance activities in nuclear power plant, it is necessary to evaluate plant performance from the viewpoint of nuclear safety and economy. So, in this paper, after the relation among maintenance optimization, maintenance performance targets, maintenance effectiveness indicator and maintenance key parameters important to nuclear safety and economy was made clear, a method to evaluate the effectiveness of maintenance activities was discussed. As a result of consideration, it was concluded that the maintenance effectiveness indicator proposed in this paper can evaluate maintenance effectiveness and can show the direction of improving existing maintenance program because the relation with maintenance performance target and maintenance key parameters is clear. (author)

  13. Program plan for future regulatory activity in nuclear-power-plant maintenance

    International Nuclear Information System (INIS)

    Badalamente, R.V.

    1982-10-01

    The intent of this paper is to describe the results of a study of nuclear power plant (NPP) maintenance conducted by Battelle's Pacific Northwest Laboratories (PNL) for the Nuclear Regulatory Commission (NRC). The purpose of the study for the NRC was to determine problems affecting human performance in NPP maintenance, pinpoint those which adversely affect public health and safety, review strategies for overcoming the problems, and suggest the direction that regulatory activities should take. Results of the study were presented to the NRC (Division of Human Factors Safety) in the form of a recommended program plan for future regulatory activity in NPP maintenance

  14. 76 FR 50489 - Agency Information Collection Activities: Harbor Maintenance Fee

    Science.gov (United States)

    2011-08-15

    ... Activities: Harbor Maintenance Fee AGENCY: U.S. Customs and Border Protection, Department of Homeland... Fee (CBP Forms 349 and 350). This is a proposed extension of an information collection that was... Fee. OMB Number: 1651-0055. Form Number: CBP Forms 349 and 350. Abstract: The Harbor Maintenance Fee...

  15. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  16. Risk mitigation strategies for operations and maintenance activities.

    Science.gov (United States)

    2012-04-01

    The objective of this research was to investigate the application of integrated risk modeling to operations and maintenance activities, specifically moving operations, such as pavement testing, pavement marking, painting, snow removal, shoulder work,...

  17. Human Error Probability Assessment During Maintenance Activities of Marine Systems

    OpenAIRE

    Rabiul Islam; Faisal Khan; Rouzbeh Abbassi; Vikram Garaniya

    2018-01-01

    Background: Maintenance operations on-board ships are highly demanding. Maintenance operations are intensive activities requiring high man–machine interactions in challenging and evolving conditions. The evolving conditions are weather conditions, workplace temperature, ship motion, noise and vibration, and workload and stress. For example, extreme weather condition affects seafarers' performance, increasing the chances of error, and, consequently, can cause injuries or fatalities to personne...

  18. Dietary and physical activity behaviors among adults successful at weight loss maintenance

    Directory of Open Access Journals (Sweden)

    Gillespie Cathleen

    2006-07-01

    Full Text Available Abstract Background There is limited population-based data on behavioral factors found to be important for successful weight loss maintenance among adults. Methods Data from the 2004 Styles surveys, mailed to U.S. adults aged ≥18 years were used to examine the difference in selected weight loss strategies and attitudes among persons who reported successful weight loss attempts (lost weight and able to keep it off and persons who were not successful (previous attempts to lose weight were unsuccessful or they could not keep the lost weight off. Behaviors examined included modification of diet, leisure-time and sports activities, and self-monitoring, and barriers to weight management. Results Among adults who reported losing weight or trying to lose weight, 31.0% had been successful at both losing weight and maintenance after weight loss. Successful weight loss status differed by sex, age, and current weight status. Assessment of reported weight loss strategies, found that exercising ≥30 minutes/day and adding physical activity to daily life were significantly higher among successful versus unsuccessful weight losers. Individuals who were successful at weight loss and maintenance were less likely to use over-the-counter diet products than those who were unsuccessful at weight loss. Significantly more successful versus unsuccessful weight losers reported that on most days of the week they planned meals (35.9% vs. 24.9%, tracked calories (17.7% vs. 8.8%, tracked fat (16.4% vs. 6.6%, and measured food on plate (15.9% vs. 6.7%. Successful losers were also more likely to weigh themselves daily (20.3% vs. 11.0%. There were a significantly higher proportion of successful losers who reported lifting weights (19.0% versus unsuccessful (10.9%. The odds of being a successful weight loser were 48%–76% lower for those reporting exercise weight control barriers were influencing factors (e.g., no time, too tired to exercise, no one to exercise with, too

  19. Human Error Probability Assessment During Maintenance Activities of Marine Systems

    Directory of Open Access Journals (Sweden)

    Rabiul Islam

    2018-03-01

    Full Text Available Background: Maintenance operations on-board ships are highly demanding. Maintenance operations are intensive activities requiring high man–machine interactions in challenging and evolving conditions. The evolving conditions are weather conditions, workplace temperature, ship motion, noise and vibration, and workload and stress. For example, extreme weather condition affects seafarers' performance, increasing the chances of error, and, consequently, can cause injuries or fatalities to personnel. An effective human error probability model is required to better manage maintenance on-board ships. The developed model would assist in developing and maintaining effective risk management protocols. Thus, the objective of this study is to develop a human error probability model considering various internal and external factors affecting seafarers' performance. Methods: The human error probability model is developed using probability theory applied to Bayesian network. The model is tested using the data received through the developed questionnaire survey of >200 experienced seafarers with >5 years of experience. The model developed in this study is used to find out the reliability of human performance on particular maintenance activities. Results: The developed methodology is tested on the maintenance of marine engine's cooling water pump for engine department and anchor windlass for deck department. In the considered case studies, human error probabilities are estimated in various scenarios and the results are compared between the scenarios and the different seafarer categories. The results of the case studies for both departments are also compared. Conclusion: The developed model is effective in assessing human error probabilities. These probabilities would get dynamically updated as and when new information is available on changes in either internal (i.e., training, experience, and fatigue or external (i.e., environmental and operational conditions

  20. The impact of self-efficacy on physical activity maintenance in patients with hip osteoarthritis

    DEFF Research Database (Denmark)

    Hammer, Nanna Maria; Bieler, Theresa; Beyer, Nina Ann-Marie

    2016-01-01

    Purpose: Understanding motivational factors related to physical activity (PA) maintenance is essential in promoting long-term exercise benefits. This study explored the impact of self-efficacy (SE) on post-intervention PA maintenance in patients with hip osteoarthritis. Method: An SE-theory based...... mixed-methods sub-study of a trial investigating the effects of 4 months supervised exercise in patients with hip osteoarthritis. Questionnaire data (n = 52; baseline and 12 months) on PA and SE (Arthritis Self-Efficacy Scale, ASES, score-range 10–100) were analysed (Mann–Whitney test) for differences...... from incorporating the self-efficacy theory in the planning and execution of exercise interventions to promote post-intervention physical activity maintenance and long term health benefits. •Post-intervention physical activity maintenance may be increased by focussing on the patients’ exercise self-efficacy...

  1. Perencanaan Kegiatan Maintenance Dengan Metode Reability Centered Maintenance (Rcm) II

    OpenAIRE

    Rachmad Hidayat; Nachnul Ansori; Ali Imron

    2010-01-01

    Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn...

  2. Maintenance of the JET active gas handling system

    International Nuclear Information System (INIS)

    Brennan, P.D.; Bell, A.C.; Brown, K.; Cole, C.; Cooper, B.; Gibbons, C.; Harris, M.; Jones, G.; Knipe, S.; Lewis, J.; Manning, C.; Miller, A.; Perevezentsev, A.; Skinner, N.; Stagg, R.; Stead, M.; Thomas, R.; Yorkshades, J.

    2003-01-01

    The JET active gas handling system (AGHS) has been in operation in conjunction with the JET machine since Spring 1997. The tritium levels within the vessel have remained sufficiently high, 6.2 g at the end of the DTE1 experiment and currently 1.5 g, such that the AGHS has been required to operate continuously to detritiate gases liberated during D-D operations and to maintain discharges to the environment to ALARP. Maintaining the system to ensure continued operation has been a key factor in guaranteeing the continued availability of the essential sub-systems. The operational history of the JET AGHS has been previously documented in a number of papers [R. Laesser, et al. Proc. of the 19th SOFT Conf. 1 (1996) 227; R. Laesser, et al., Fusion Eng. Des. 46 (1999) 307; P.D. Brennan, et al., 18th Symp. on Fusion Eng., 1999]. Operational downtime is minimised through well-engineered sub-systems that use high integrity components. Outage, contamination and operator dosage are minimised through pre-planned and prepared maintenance operations. The reliability of sub-system critical condition fault detection is demonstrated through routine testing of hard-wired alarms and interlocks

  3. Public Tourism Infrastructure: Challenges in the Development and Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Abdullah Shardy

    2014-01-01

    Full Text Available In Malaysia, the tourism sector is a major contributor to the nation’s development and is spearheaded by the government’s efforts in investing heavily towards providing sufficient and well-functioning public tourism infrastructure. This infrastructure should be ideally developed with a clear and systematic maintenance plan in hand. The challenge herein is not merely providing the necessary infrastructure to sustain tourism activities but rather a pro-active approach towards establishing and subsequently maintaining this infrastructure at its optimal level. The aim of this paper therefore is to identify critical aspects that need to be in place to further enhance the Malaysian tourism industry. The paper discusses the issues and challenges that need to be addressed as a precursor towards an effectively developed and maintained tourism infrastructure system. Development issues that have been identified revolve around the dimensions of quality, quantity and ability of the public agencies involved, particularly issues of inadequate infrastructure, quality of infrastructure and the capability of the agencies in undertaking efficient maintenance activities. These issues were found to lead towards challenges of working with resource constraints, lack of an effective maintenance culture and system as well as the need for clear and effective policies and strategies.

  4. Designing Interventions that Last: A Classification of Environmental Behaviors in Relation to the Activities, Costs, and Effort Involved for Adoption and Maintenance

    Science.gov (United States)

    Moore, Harriet E.; Boldero, Jennifer

    2017-01-01

    Policy makers draw on behavioral research to design interventions that promote the voluntary adoption of environmental behavior in societies. Many environmental behaviors will only be effective if they are maintained over the long-term. In the context of climate change and concerns about future water security, behaviors that involve reducing energy consumption and improving water quality must be continued indefinitely to mitigate global warming and preserve scarce resources. Previous reviews of environmental behavior have focused exclusively on factors related to adoption. This review investigates the factors that influence both adoption and maintenance, and presents a classification of environmental behaviors in terms of the activities, costs, and effort required for both adoption and maintenance. Three categories of behavior are suggested. One-off behaviors involve performing an activity once, such as purchasing an energy efficient washing machine, or signing a petition. Continuous behaviors involve the performance of the same set of behaviors for adoption and for maintenance, such as curbside recycling. Dynamic behaviors involve the performance of different behaviors for adoption and maintenance, such as revegetation. Behaviors can also be classified into four categories related to cost and effort: those that involve little cost and effort for adoption and maintenance, those that involve moderate cost and effort for adoption and maintenance, those that involve a high cost or effort for adoption and less for maintenance, and those that involve less cost or effort for adoption and a higher amount for maintenance. In order to design interventions that last, policy makers should consider the factors that influence the maintenance as well as the adoption of environmental behaviors. PMID:29163265

  5. Priority ranking for maintenance activities on embankment dams

    International Nuclear Information System (INIS)

    Chouinard, L.E.; Andersen, G.R.; Robichaud, J.G.; Blanchette, G.; Gervais, R.

    1998-01-01

    Operators of dams in Canada and the U.S. are steadily shifting from construction of new facilities to the maintenance and repairs of existing ones. This paper emphasized the importance of prioritizing maintenance activities on embankment dams whose maintenance needs vary from structure to structure. Two parallel procedures were developed, one for monitoring devices and the other for defense groups. Both procedures are intended to be used together to rate the condition of the embankment dams. The term 'defense groups' is used to refer to the collection of physical components on dams to prevent adverse conditions from occurring that would result in an uncontrolled release of the reservoir. The priority rankings and condition indices developed by means of this procedure reflects the judgment of a panel of engineers and geologists who implement them. They are not to be interpreted as an index of dam safety. While the process is sufficiently well developed to warrant wide-spread distribution, it is considered to be still in the developmental stage. Therefore, it should be used in conjunction with other parallel processes evaluating structural, mechanical and electrical features of the structure under consideration. 6 refs., 7 tabs

  6. Improved inflammatory activity with peginterferon alfa-2b maintenance therapy in non-cirrhotic prior non-responders: a randomized study.

    Science.gov (United States)

    Poynard, Thierry; Bruix, Jordi; Schiff, Eugene R; Diago, Moises; Berg, Thomas; Moreno-Otero, Ricardo; Lyra, Andre C; Carrilho, Flair; Griffel, Louis H; Boparai, Navdeep; Jiang, Ruiyun; Burroughs, Margaret; Brass, Clifford A; Albrecht, Janice K

    2013-03-01

    Therapeutic options for patients failing hepatitis C retreatment are limited. EPIC(3) included a prospective trial assessing long-term peginterferon alfa-2b (PegIFNα-2b) maintenance therapy in patients with METAVIR fibrosis scores (MFS) of F2 or F3 who previously failed hepatitis C retreatment. Patients with F2/F3 MFS who failed retreatment were randomized to PegIFNα-2b (0.5 μg/kg/week, n=270) or observation (n=270) for 36 months. Blinded liver biopsies obtained before retreatment and after maintenance therapy were evaluated using MFS and activity scores, and confirmatory testing was performed using FibroTest and ActiTest. In total, 348 patients had paired biopsies: 192 patients had missing post-treatment biopsies and were considered as having no change in fibrosis/activity scores. In total, 16% of patients receiving PegIFNα-2b and 11% of observation patients had improvement in MFS (p=0.32). More PegIFNα-2b than observation patients had improvement in activity score (20% vs. 9%; p 2.5 years, improvement in MFS or activity score was more common with PegIFNα-2b than observation (21% vs. 14%, p=0.08 and 26% vs. 10%, p 2.5 years. Both FibroTest and ActiTest were significantly improved during maintenance therapy. Copyright © 2012 European Association for the Study of the Liver. Published by Elsevier B.V. All rights reserved.

  7. Financial Motivation Undermines Maintenance in an Intensive Diet and Activity Intervention

    Directory of Open Access Journals (Sweden)

    Arlen C. Moller

    2012-01-01

    Full Text Available Financial incentives are widely used in health behavior interventions. However, self-determination theory posits that emphasizing financial incentives can have negative consequences if experienced as controlling. Feeling controlled into performing a behavior tends to reduce enjoyment and undermine maintenance after financial contingencies are removed (the undermining effect. We assessed participants’ context-specific financial motivation to participate in the Make Better Choices trial—a trial testing four different strategies for improving four health risk behaviors: low fruit and vegetable intake, high saturated fat intake, low physical activity, and high sedentary screen time. The primary outcome was overall healthy lifestyle change; weight loss was a secondary outcome. Financial incentives were contingent upon meeting behavior goals for 3 weeks and became contingent upon merely providing data during the 4.5-month maintenance period. Financial motivation for participation was assessed at baseline using a 7-item scale (=.97. Across conditions, a main effect of financial motivation predicted a steeper rate of weight regained during the maintenance period, (165=2.15, =.04. Furthermore, financial motivation and gender interacted significantly in predicting maintenance of healthy diet and activity changes, (160=2.42, =.016, such that financial motivation had a more deleterious influence among men. Implications for practice and future research on incentivized lifestyle and weight interventions are discussed.

  8. Quality Control Activities Related to Mechanical Maintenance of Safety Related Components at Krsko NPP

    International Nuclear Information System (INIS)

    Djakovic, D.

    2016-01-01

    For successful, safe and reliable operation of nuclear power plant, maintenance processes have to be systematically controlled and procedures for quality control of maintenance activities shall be established. This is requested by the quality assurance program, which shall provide control over activities affecting the quality of structures, systems, and components, considering their importance to safety. As a part of Quality and Nuclear Oversight Division (QNOD; SKV), the Quality Control Department (QC) provides quality control activities, which are deeply involved in maintenance processes at Krsko NPP, both on safety related and non-safety related (non-nuclear safety) components. QC activities on safety related components have to fulfil all requirements, which will enable the components to perform their intended safety functions. This paper describes quality control activities related to mechanical maintenance of safety related components at Krsko NPP and significant role of the Krsko plant QC Department in three particular maintenance cases connected with safety related components. In these three specific cases, the QC has confirmed its importance in compliance with quality assurance program and presented its significant added value in providing safe and reliable operation of the plant. The first maintenance activity was installation of nozzle check valves in the scope of a modification for improving regulation of spent fuel pit pumps. The QC Department performed receipt inspection of the valves. Using non-destructive examination methods and X-ray spectrometry, it was found out that the valve diffuser was made of improper material, which could cause progressive corrosion of the valve diffuser in borated water and consequently a loss of safety function of the valves followed by long-term consequences. The second one was the receipt inspection of containment ventilation fan coolers. The coolers were claimed and sent back to the supplier because the QC Department

  9. Present activity in ASME Section XI regarding risk-informed maintenance

    International Nuclear Information System (INIS)

    Hedden, Owen; Chockie, Alan

    2005-01-01

    Since 1996 Section XI of the ASME Boiler and Pressure Vessel Code has actively incorporated risk-informed concepts. The risk-informed process provides a framework for allocating inspection resources in a cost-effective manner and helps focus inspections where most critical for plant safety. Based on the success of the risk-informed ISI piping applications at US and non-US plants, Section XI has refined existing Code Cases and expanded the use of the risk-informed process to a variety of high-risk components and systems. The risk informed approach started in the area of inspection and is now being expanded to other plant maintenance activities. This article summarizes the Section XI actions and the continued development of the risk-informed process to improve nuclear plant maintenance. (author)

  10. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  11. Lessons Learned from Outsourcing the Pearl Harbor MK-48 Intermediate Maintenance Activity

    National Research Council Canada - National Science Library

    Gansler, Jacques S; Lucyshyn, William; Alarcon-Deza, Benigno

    2008-01-01

    During the 1990s, active duty sailor resources were in large demand. In an effort to return sailors to the fleet, the operation of the Navy's Heavyweight Torpedo Intermediate Maintenance Activities (IMA...

  12. Relationship Maintenance on Facebook: Development of a Measure, Relationship to General Maintenance, and Relationship Satisfaction

    Science.gov (United States)

    Dainton, Marianne

    2013-01-01

    Previous research indicates that the primary reason college students use Facebook is for relationship maintenance. The present study sought to determine the relationship between Facebook maintenance and general maintenance efforts in college student romantic relationships, as well as the impacts of such behaviors on the relationship. Survey data…

  13. Financial Motivation Undermines Maintenance in an Intensive Diet and Activity Intervention

    Science.gov (United States)

    Moller, Arlen C.; McFadden, H. Gene; Hedeker, Donald; Spring, Bonnie

    2012-01-01

    Financial incentives are widely used in health behavior interventions. However, self-determination theory posits that emphasizing financial incentives can have negative consequences if experienced as controlling. Feeling controlled into performing a behavior tends to reduce enjoyment and undermine maintenance after financial contingencies are removed (the undermining effect). We assessed participants' context-specific financial motivation to participate in the Make Better Choices trial—a trial testing four different strategies for improving four health risk behaviors: low fruit and vegetable intake, high saturated fat intake, low physical activity, and high sedentary screen time. The primary outcome was overall healthy lifestyle change; weight loss was a secondary outcome. Financial incentives were contingent upon meeting behavior goals for 3 weeks and became contingent upon merely providing data during the 4.5-month maintenance period. Financial motivation for participation was assessed at baseline using a 7-item scale (α = .97). Across conditions, a main effect of financial motivation predicted a steeper rate of weight regained during the maintenance period, t(165) = 2.15, P = .04. Furthermore, financial motivation and gender interacted significantly in predicting maintenance of healthy diet and activity changes, t(160) = 2.42, P = .016, such that financial motivation had a more deleterious influence among men. Implications for practice and future research on incentivized lifestyle and weight interventions are discussed. PMID:22548152

  14. Homogenization of independent inspection criteria of Quality Assurance in the maintenance activities

    International Nuclear Information System (INIS)

    Gomez Cardinanos, R.

    2012-01-01

    Among the official documents governing the operation of Spanish nuclear power plants is the Quality Manual and Quality Assurance. This manual gives a formal answer to the requirements of the regulations and the Nuclear Safety Council. To monitor the compliance of its requirements, the plants are controlled by independent organizations. Since 2007, in nuclear Sta. Maria de Garona is developed a project to improve the performance of the QA inspectors during maintenance activities. Results of the project have been edited data sheets on specific activities of maintenance. The project aims to incorporate sheets that help QA inspectors in their daily inspection.

  15. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  16. Maintenance and decline of physical activity during adolescence: insights from a qualitative study

    Directory of Open Access Journals (Sweden)

    Filion Annie

    2011-10-01

    Full Text Available Abstract Purpose Better knowledge on why some individuals succeed in maintaining participation in physical activity throughout adolescence is needed to guide the development of effective interventions to increase and then maintain physical activity levels. Despite allowing an in-depth understanding, qualitative designs have infrequently been used to study physical activity maintenance. We explored factors contributing to the maintenance and the decline of physical activity during adolescence. Methods Questionnaires were administered to 515 grade 10-12 students. The Physical Activity Questionnaire for Adolescents was used to determine physical activity level at the end of adolescence. An adapted version of this questionnaire was used to estimate physical activity in early adolescence. Among both genders, we identified participants who maintained a high level of physical activity since grade 7 and some whose activity level declined. For each category, groups of 10 students were randomly selected to take part in focus group discussions. Results Seven focus groups with 5 to 8 participants in each were held. Both maintainers and decliners associated physical activity with positive health outcomes. Maintenance of physical activity was associated with supportive social environments and heightened feelings of competence and attractiveness. A decline in physical activity was associated with negative social validation, poor social support and barriers related to access. Conclusions Although maintainers and decliners associate physical activity with similar themes, the experiences of both groups differ substantially with regards to those themes. Taking both perspectives in consideration could help improve interventions to increase and maintain physical activity levels of adolescents.

  17. Remote maintenance design activities and research and development accomplishments for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1988-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (rf) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance activities internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For activities external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radiation-waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. 5 figs

  18. Opportunities and supporting activities to promote preventive maintenance of NPPs in Japan

    International Nuclear Information System (INIS)

    Sanada, A.; Shinkawa, T.; Sakurada, M.

    1998-01-01

    With increase of the number of NPPs and operation history, enhancement of the safety regulation is becoming important for such long-operated NPPs. Centering on the comprehensive preventive maintenance, periodic safety reviews by utilities and its review and evaluation by MITI are in progress. The first reviews have not revealed essential and critical indications to be newly implemented. This means that the most of activities to secure reliability and safety have been done steadily. The present paper addresses the mechanism of on-going preventive maintenance and its essential elements: opportunities to identify issues and problems, and supporting activities to promote decision-makings on feedback, upgrading and modernization of NPPs. (author)

  19. Plant Maintenance. The Licensee's Viewpoint

    Energy Technology Data Exchange (ETDEWEB)

    Ungi, T. [Heysham 2 Power Station, Nuclear Electric LTD (United Kingdom)

    1997-07-01

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)

  20. Relationship challenges and relationship maintenance activities following disclosure of transsexualism.

    Science.gov (United States)

    Alegría, C Aramburu

    2010-12-01

    • Transsexual persons are increasing their visibility in society, and health care providers and others (such as social workers) will be called upon to help with issues that transsexual persons face. Challenges that face transsexual persons often include issues involving relationships. Psychiatric and mental health nurses and other caregivers can increase their therapeutic skills in working with couples that include transsexual persons by becoming aware of these challenges and subsequent activities that can help with them. • This research study looks at couple relationships in which one partner reveals male-to-female transsexual identity. These are relationships that were established as man-woman and now will transition into relationships that include a male-to-female person and a female partner. • Common challenges for these couples include issues related to: (1) sexual identity and relationship uncertainty; (2) male-to-female transition decision making; and (3) presenting in public. • Relationship maintenance activities that helped the couples in the study maintain and strengthen their relationships through these challenges include: (1) communication; (2) self-talk (for example, putting the situation in perspective); (3) social networks; (4) positive interactions; (5) impression management (for example, managing displays of affection in public); and (6) social activism. This qualitative study describes the relational dynamics that help sustain relationships of couples that include male-to-female transsexual persons (MTF) and their natal female partners (NF) following disclosure of transsexualism. Relationship challenges and relationship maintenance activities are identified. Each partner in 17 MTF-NF couples participated in individual surveys and interviews. The data were coded for themes related to relationship challenges and activities. MTF-NF couples experience challenges within the contexts of their relationships and of society. These challenges

  1. Human temporal cortical single neuron activity during working memory maintenance.

    Science.gov (United States)

    Zamora, Leona; Corina, David; Ojemann, George

    2016-06-01

    The Working Memory model of human memory, first introduced by Baddeley and Hitch (1974), has been one of the most influential psychological constructs in cognitive psychology and human neuroscience. However the neuronal correlates of core components of this model have yet to be fully elucidated. Here we present data from two studies where human temporal cortical single neuron activity was recorded during tasks differentially affecting the maintenance component of verbal working memory. In Study One we vary the presence or absence of distracting items for the entire period of memory storage. In Study Two we vary the duration of storage so that distractors filled all, or only one-third of the time the memory was stored. Extracellular single neuron recordings were obtained from 36 subjects undergoing awake temporal lobe resections for epilepsy, 25 in Study one, 11 in Study two. Recordings were obtained from a total of 166 lateral temporal cortex neurons during performance of one of these two tasks, 86 study one, 80 study two. Significant changes in activity with distractor manipulation were present in 74 of these neurons (45%), 38 Study one, 36 Study two. In 48 (65%) of those there was increased activity during the period when distracting items were absent, 26 Study One, 22 Study Two. The magnitude of this increase was greater for Study One, 47.6%, than Study Two, 8.1%, paralleling the reduction in memory errors in the absence of distracters, for Study One of 70.3%, Study Two 26.3% These findings establish that human lateral temporal cortex is part of the neural system for working memory, with activity during maintenance of that memory that parallels performance, suggesting it represents active rehearsal. In 31 of these neurons (65%) this activity was an extension of that during working memory encoding that differed significantly from the neural processes recorded during overt and silent language tasks without a recent memory component, 17 Study one, 14 Study two

  2. Human Temporal Cortical Single Neuron Activity During Working Memory Maintenance

    Science.gov (United States)

    Zamora, Leona; Corina, David; Ojemann, George

    2016-01-01

    The Working Memory model of human memory, first introduced by Baddeley and Hitch (1974), has been one of the most influential psychological constructs in cognitive psychology and human neuroscience. However the neuronal correlates of core components of this model have yet to be fully elucidated. Here we present data from two studies where human temporal cortical single neuron activity was recorded during tasks differentially affecting the maintenance component of verbal working memory. In Study One we vary the presence or absence of distracting items for the entire period of memory storage. In Study Two we vary the duration of storage so that distractors filled all, or only one-third of the time the memory was stored. Extracellular single neuron recordings were obtained from 36 subjects undergoing awake temporal lobe resections for epilepsy, 25 in Study one, 11 in Study two. Recordings were obtained from a total of 166 lateral temporal cortex neurons during performance of one of these two tasks, 86 study one, 80 study two. Significant changes in activity with distractor manipulation were present in 74 of these neurons (45%), 38 Study one, 36 Study two. In 48 (65%) of those there was increased activity during the period when distracting items were absent, 26 Study One, 22 Study Two. The magnitude of this increase was greater for Study One, 47.6%, than Study Two, 8.1%, paralleling the reduction in memory errors in the absence of distracters, for Study One of 70.3%, Study Two 26.3% These findings establish that human lateral temporal cortex is part of the neural system for working memory, with activity during maintenance of that memory that parallels performance, suggesting it represents active rehearsal. In 31 of these neurons (65%) this activity was an extension of that during working memory encoding that differed significantly from the neural processes recorded during overt and silent language tasks without a recent memory component, 17 Study one, 14 Study two

  3. Automatic electromagnetic valve for previous vacuum

    International Nuclear Information System (INIS)

    Granados, C. E.; Martin, F.

    1959-01-01

    A valve which permits the maintenance of an installation vacuum when electric current fails is described. It also lets the air in the previous vacuum bomb to prevent the oil ascending in the vacuum tubes. (Author)

  4. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  5. Physical activity and healthy weight maintenance from childhood to adulthood.

    Science.gov (United States)

    Cleland, Verity J; Dwyer, Terence; Venn, Alison J

    2008-06-01

    The objective of this study was to determine whether change in physical activity was associated with maintaining a healthy weight from childhood to adulthood. This prospective cohort study examined 1,594 young Australian adults (48.9% female) aged 27-36 years who were first examined at age 9-15 years as part of a national health and fitness survey. BMI was calculated from measured height and weight, and physical activity was self-reported at both time points; pedometers were also used at follow-up. Change in physical activity was characterized by calculating the difference between baseline and follow-up z-scores. Change scores were categorized as decreasing (large, moderate), stable, or increasing (large, moderate). Healthy weight was defined in childhood as a BMI less than international overweight cutoff points, and in adulthood as BMIdecreases in physical activity, females in all other groups were 25-37% more likely to be healthy weight maintainers, although associations differed according to the physical activity measure used at follow-up and few reached statistical significance. Although younger males whose relative physical activity moderately or largely increased were 27-34% more likely to be healthy weight maintainers than those whose relative physical activity largely decreased, differences were not statistically significant. In conclusion, relatively increasing and stable physical activity from childhood to adulthood was only weakly associated with healthy weight maintenance. Examining personal, social, and environmental factors associated with healthy weight maintenance will be an important next step in understanding why some groups avoid becoming overweight.

  6. Adolescents' physical activity is associated with previous and current physical activity practice by their parents.

    Science.gov (United States)

    Christofaro, Diego Giulliano Destro; Andersen, Lars Bo; Andrade, Selma Maffei de; Barros, Mauro Virgílio Gomes de; Saraiva, Bruna Thamyres Ciccotti; Fernandes, Rômulo Araújo; Ritti-Dias, Raphael Mendes

    The purpose of this study was to determine whether parents' current and previous physical activity practice is associated with adolescents' physical activity. The sample was composed of 1231 adolescents (14-17 years), and 1202 mothers and 871 fathers were interviewed. Weight and height of the adolescents were measured. Self-reported parents' weight and height were obtained. The current and previous physical activity levels (Baecke's questionnaire) of parents (during childhood and adolescence) and adolescents' physical activity levels were obtained using a questionnaire. The magnitude of the associations between parent and adolescent physical activity levels was determined by binary logistic regression (adjusted by sex, age, and socioeconomic level of adolescents and education level of parents). The current physical activity practice by parents was associated with adolescents' physical activity (p<0.001). The physical activities reported by parents in their childhood and adolescence were also associated with higher physical activity levels among adolescents. Adolescents whose parents were both physically active in the past and present were six times (OR=6.67 [CI=1.94-22.79]) more likely to be physically active compared to adolescents with no parents who were physically active in the past. The current and previous physical activities of parents were associated with higher levels of physical activity in adolescents, even after controlling for confounding factors. Copyright © 2017 Sociedade Brasileira de Pediatria. Published by Elsevier Editora Ltda. All rights reserved.

  7. Adolescents' physical activity is associated with previous and current physical activity practice by their parents

    Directory of Open Access Journals (Sweden)

    Diego Giulliano Destro Christofaro

    Full Text Available Abstract Objective: The purpose of this study was to determine whether parents' current and previous physical activity practice is associated with adolescents' physical activity. Methods: The sample was composed of 1231 adolescents (14-17 years, and 1202 mothers and 871 fathers were interviewed. Weight and height of the adolescents were measured. Self-reported parents' weight and height were obtained. The current and previous physical activity levels (Baecke's questionnaire of parents (during childhood and adolescence and adolescents' physical activity levels were obtained using a questionnaire. The magnitude of the associations between parent and adolescent physical activity levels was determined by binary logistic regression (adjusted by sex, age, and socioeconomic level of adolescents and education level of parents. Results: The current physical activity practice by parents was associated with adolescents' physical activity (p < 0.001. The physical activities reported by parents in their childhood and adolescence were also associated with higher physical activity levels among adolescents. Adolescents whose parents were both physically active in the past and present were six times (OR = 6.67 [CI = 1.94-22.79] more likely to be physically active compared to adolescents with no parents who were physically active in the past. Conclusions: The current and previous physical activities of parents were associated with higher levels of physical activity in adolescents, even after controlling for confounding factors.

  8. Sustained activation of STAT5 is essential for chromatin remodeling and maintenance of mammary-specific function

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Ren; Nelson, Celeste M.; Muschler, John L.; Veiseh, Mandana; Vonderhaar, Barbara K.; Bissell, Mina J.

    2009-06-03

    Epithelial cells, once dissociated and placed in two-dimensional (2D) cultures, rapidly lose tissue-specific functions. We showed previously that in addition to prolactin, signaling by laminin-111 was necessary to restore functional differentiation of mammary epithelia. Here, we elucidate two additional aspects of laminin-111 action. We show that in 2D cultures, the prolactin receptor is basolaterally localized and physically segregated from its apically placed ligand. Detachment of the cells exposes the receptor to ligation by prolactin leading to signal transducers and activators of transcription protein 5 (STAT5) activation, but only transiently and not sufficiently for induction of milk protein expression. We show that laminin-111 reorganizes mammary cells into polarized acini, allowing both the exposure of the prolactin receptor and sustained activation of STAT5. The use of constitutively active STAT5 constructs showed that the latter is necessary and sufficient for chromatin reorganization and {beta}-casein transcription. These results underscore the crucial role of continuous laminin signaling and polarized tissue architecture in maintenance of transcription factor activation, chromatin organization, and tissue-specific gene expression.

  9. Dynamic contracting : An asset management tool in controlling infrastructure maintenance activities

    NARCIS (Netherlands)

    Demirel, H.C.; de Ridder, H.A.J.; Hertogh, M.J.C.M.

    2013-01-01

    Infrastructure road network is a complex system in a fast changing complicated environment and therefore subject to change. The changes refer to demands, requirements, regulations and financial possibilities as well as advanced technologies. Therefore outsourcing maintenance activities are rather

  10. Integrated fuzzy analytic hierarchy process and VIKOR method in the prioritization of pavement maintenance activities

    Directory of Open Access Journals (Sweden)

    Peyman Babashamsi

    2016-03-01

    Full Text Available Maintenance activities and pavement rehabilitation require the allocation of massive finances. Yet due to budget shortfalls, stakeholders and decision-makers must prioritize projects in maintenance and rehabilitation. This article addresses the prioritization of pavement maintenance alternatives by integrating the fuzzy analytic hierarchy process (AHP with the VIKOR method (which stands for ‘VlseKriterijumska Optimizacija I Kompromisno Resenje,’ meaning multi-criteria optimization and compromise solution for the process of multi-criteria decision analysis (MCDA by considering various pavement network indices. The indices selected include the pavement condition index (PCI, traffic congestion, pavement width, improvement and maintenance costs, and the time required to operate. In order to determine the weights of the indices, the fuzzy AHP is used. Subsequently, the alternatives’ priorities are ranked according to the indices weighted with the VIKOR model. The choice of these two independent methods was motivated by the fact that integrating fuzzy AHP with the VIKOR model can assist decision makers with solving MCDA problems. The case study was conducted on a pavement network within the same particular region in Tehran; three main streets were chosen that have an empirically higher maintenance demand. The most significant factors were evaluated and the project with the highest priority was selected for urgent maintenance. By comparing the index values of the alternative priorities, Delavaran Blvd. was revealed to have higher priority over the other streets in terms of maintenance and rehabilitation activities. Keywords: Maintenance and rehabilitation prioritization, Fuzzy analysis hierarchy process, VIKOR model, Pavement condition index, Multi-criteria decision analysis

  11. Process cells dismantling of EUREX pant: previous activities

    International Nuclear Information System (INIS)

    Gili, M.

    1998-01-01

    In the '98-'99 period some process cells of the EUREX pant will be dismantled, in order to place there the liquid wastes conditioning plant 'CORA'. This report resumes the previous activities (plant rinsing campaigns and inactive Cell 014 dismantling), run in the past three years and the drawn experience [it

  12. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    OpenAIRE

    Orlando Duran; Andrea Capaldo; Paulo Andrés Duran Acevedo

    2017-01-01

    Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despi...

  13. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  14. Organizational-economic maintenance of innovation activity in the region: comparative assessment

    Directory of Open Access Journals (Sweden)

    Nadezhda Igorevna Antipina

    2014-05-01

    Full Text Available The article proposes the approach to evaluate the organizational-economic maintenance of innovation activity in the regions in quantitative and qualitative indicators, as well as the method to calculate the assessment of regulatory support of this activity. It justifies the author’s approach of comparative efficiency evaluation of innovation legislation and regions’ innovation development level. The article gives the qualitative estimation of regulatory support of innovation development in the regions that are innovation leaders. It singles out key directions to develop regulatory support of innovation activity, which encourage RF subjects’ innovation activity

  15. The impact of self-efficacy on physical activity maintenance in patients with hip osteoarthritis - a mixed methods study.

    Science.gov (United States)

    Hammer, Nanna Maria; Bieler, Theresa; Beyer, Nina; Midtgaard, Julie

    2016-08-01

    Understanding motivational factors related to physical activity (PA) maintenance is essential in promoting long-term exercise benefits. This study explored the impact of self-efficacy (SE) on post-intervention PA maintenance in patients with hip osteoarthritis. An SE-theory based mixed-methods sub-study of a trial investigating the effects of 4 months supervised exercise in patients with hip osteoarthritis. Questionnaire data (n = 52; baseline and 12 months) on PA and SE (Arthritis Self-Efficacy Scale, ASES, score-range 10-100) were analysed (Mann-Whitney test) for differences in characteristics of maintainers and non-maintainers. Semi-structured individual interviews (n = 15; at 12-months follow-up) were analysed using directed content analysis. Compared to non-maintainers (n = 9; 17%) maintainers (n = 31; 60%) had improved (p exercise outcome expectations and obligation towards the study influenced maintenance. SE contributes to understanding of post-intervention PA maintenance in patients with hip osteoarthritis. However, disease-related factors and clinical trial participation appears significant too. Implications for Rehabilitation Patients' perceived self-efficacy for physical activity contributes to the understanding of post-intervention physical activity maintenance in patients with hip osteoarthritis. Practitioners may benefit from incorporating the self-efficacy theory in the planning and execution of exercise interventions to promote post-intervention physical activity maintenance and long term health benefits. Post-intervention physical activity maintenance may be increased by focussing on the patients' exercise self-efficacy through verbal persuasion and support, disease-specific information and information on normal physiological responses to exercise combined with an individualised training progression to support experiences of success and achievement of desired outcomes.

  16. The role of affects and emotions in physical activity maintenance

    Directory of Open Access Journals (Sweden)

    Benjamin Wienke

    2016-08-01

    Full Text Available Although previous research has shown that affective variables are consistently associated with physical activity behavior, the working mechanisms are not understood to the extent of creating an intervention. The aim of this study is to identify situations and aspects of physical activity, which lead to positive affective reactions in people taking part in regular and long-term exercise. In this study 24 adults (12 female, 12 male distributed over three age groups (young, middle, and late adulthood that took part in sport programs (individual or team sport for at least five years. Semi-structured in depth interviews with questions about physical activity, long term participation and affective response in a sporting environment were conducted in order to ascertain those situations and aspects of the exercise program triggering positive affective states. Interviews were transcribed verbatim and followed Grounded Theory principles. Emerging concepts were grouped and merged into different categories representing the key aspects of exercise. Four factors were identified which are associated with emergence of positive emotions in sport and exercise. Firstly, perceived competence is one of the major factors influencing affective states during physical activity representing individual and collective success and progress, competition and challenge. Secondly, perceived social interaction is another factor comprising of all sorts of peer-related aspects such as communication with others, being part of a group and creating close relationships or friendships. Thirdly, novelty experience in contrast to other none-sporting activities such as work, family or other leisure activities was another factor. The last factor found was the perceived physical exertion comprising the degree of exhaustion, a possibly delayed turnaround in the affective response and the aspect of sport being a physical compensation for everyday sedentary life. The results of this study

  17. A Study on the Maintenance Effectiveness Assessment for Active Components

    International Nuclear Information System (INIS)

    Lim, Woo Sang; Oh, Seung Jong

    2006-01-01

    One of the key tasks in the periodic safety review (PSR) of nuclear power plant is to assess the aging management of structures, systems and components (SSC). The evaluation can be categorized by two parts, passive and active components. Unlike the passive components, active components are periodically maintained and replaced with new components, so the evaluation of aging mechanism of the passive components such as erosion, corrosion is not applicable to the evaluation of active components of nuclear power plant. For active components, they will maintain capability to fulfill its design function if preventive maintenance effectiveness is proper. In this paper, the assessment based on the reliability and availability of the active components of the domestic nuclear power plants is examined

  18. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  19. Relationship between volition, physical activity and weight loss maintenance: Study rationale, design, methods and baseline characteristics.

    Science.gov (United States)

    Dandanell, Sune; Elbe, Anne-Marie; Pfister, Gertrud; Elsborg, Peter; W Helge, Jørn

    2017-05-01

    To investigate the relationship between volition, physical activity and weight loss maintenance. We recruited 84 sedentary (maximal oxygen uptake: 25 ± 5 ml/min), overweight and obese (Body mass index (BMI) 38 ± 7 m/h 2 , fat 44 ± 7 %) women ( n = 55) and men ( n = 29) for an interdisciplinary prospective study with follow-up. The change in lifestyle and weight loss is promoted via a 3-month intensive lifestyle intervention at a private health school. The intervention consists of supervised training (1-3 hours/day), a healthy hypo-caloric diet (-500 to -700 kCal/day) and education in healthy lifestyle in classes/groups. The participants' body weight and composition (Dual Energy X-ray absorptiometry), volitional skills (questionnaire), physical activity level (heart rate accelerometer/questionnaire) and maximal oxygen uptake (indirect calorimetry) are to be monitored before, after, and 3 and 12 months after the intervention. At the 12-month follow-up, three different groups will be established: Clinical weight loss maintenance (> 10% weight loss from baseline), moderate weight loss maintenance (1-10% weight loss) and no weight loss (or weight regain). A linear mixed model analysis will be used to compare levels of volitional skills, physical activity and maximal oxygen uptake over time, between the three groups. Correlational analyses will be used to investigate possible associations between volition, maximal oxygen uptake, physical activity level and weight loss maintenance. If specific volitional skills are identified as predictors of adherence to physical activity and success in clinical weight loss maintenance, these can be trained in future intensive lifestyle interventions in order to optimize the success rate.

  20. Flexibility within working memory and the focus of attention for sequential verbal information does not depend on active maintenance.

    Science.gov (United States)

    Sandry, Joshua; Schwark, Jeremy D; MacDonald, Justin

    2014-10-01

    The focus of attention seems to be a static element within working memory when verbal information is serially presented, unless additional time is available for processing or active maintenance. Experiment 1 manipulated the reward associated with early and medial list positions in a probe recognition paradigm and found evidence that these nonterminal list positions could be retrieved faster and more accurately if participants were appropriately motivated-without additional time for processing or active maintenance. Experiment 2 used articulatory suppression and demonstrated that the underlying maintenance mechanism cannot be attributed to rehearsal, leaving attentional refreshing as the more likely mechanism. These findings suggest that the focus of attention within working memory can flexibly maintain nonterminal early and medial list representations at the expense of other list representations even when there is not additional time for processing or active maintenance. Maintenance seems to be accomplished through an attentional refreshing mechanism.

  1. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  2. On-line maintenance at Cofrentes NPP

    International Nuclear Information System (INIS)

    Roldan Vilches, J.; Moreno Matarranz, M. A.; Hermana Mendioroz, I.

    1998-01-01

    Cofrentes NPP has begun in 1997 activities related to At Power Preventive Maintenance over trains or systems which lead to a voluntary entry in a Limitative Condition of Operation (LCO) of the Technical Specifications. From others benefits, this program ha improved the risk management and the staff's knowledge over the functions and safety implications of the different systems, the better exploit of the resources, the co-ordination of the different organisations involved (Maintenance an Operation) and the reductions of works during shutdowns. Previous to each work, a feasibility study analyzes qualitative and quantitative (PSA), using the Risk Monitor, the implications on safety of all the tasks, assuring that the global safety of the Plant is always maintained. Tech. Spec. are analyzed in detail and also are analyzed situations of simultaneous unavailabilities of systems which could lead to a high risk situation. Two different risk controls are defined (punctual and accumulated) to assure that high risk situations will not be given. Finally, historical risk profile is analyzed to assure that the accumulated risk increase is not significant. Risk Monitor helps staff in the schedule and follow-up of the activities of On-Line Maintenance. Each one of the tasks are deeply planned and harshly analyzed and are carried out by high qualified workers. By the moment, this program is running with fully satisfaction on the Plant. (Author)

  3. Proposal for monitoring concrete painting as a preventive maintenance tool (Abutments and pier caps).

    Science.gov (United States)

    2017-07-01

    One of the growing number of preventive bridge maintenance activities conducted by the Kentucky Transportation Cabinet (KYTC) is washing and applying thin film protective coatings to bridge abutments and piers. Previous work conducted by Kentucky Tra...

  4. Predicting maintenance of attendance at walking groups: testing constructs from three leading maintenance theories.

    Science.gov (United States)

    Kassavou, Aikaterini; Turner, Andrew; Hamborg, Thomas; French, David P

    2014-07-01

    Little is known about the processes and factors that account for maintenance, with several theories existing that have not been subject to many empirical tests. The aim of this study was to test how well theoretical constructs derived from the Health Action Process Approach, Rothman's theory of maintenance, and Verplanken's approach to habitual behavior predicted maintenance of attendance at walking groups. 114 participants, who had already attended walking groups in the community for at least 3 months, completed a questionnaire assessing theoretical constructs regarding maintenance. An objective assessment of attendance over the subsequent 3 months was gained. Multilevel modeling was used to predict maintenance, controlling for clustering within walking groups. Recovery self-efficacy predicted maintenance, even after accounting for clustering. Satisfaction with social outcomes, satisfaction with health outcomes, and overall satisfaction predicted maintenance, but only satisfaction with health outcomes significantly predicted maintenance after accounting for clustering. Self-reported habitual behavior did not predict maintenance despite mean previous attendance being 20.7 months. Recovery self-efficacy, and satisfaction with health outcomes of walking group attendance appeared to be important for objectively measured maintenance, whereas self-reported habit appeared not to be important for maintenance at walking groups. The findings suggest that there is a need for intervention studies to boost recovery self-efficacy and satisfaction with outcomes of walking group attendance, to assess impact on maintenance.

  5. Plant Maintenance. The Licensee's Viewpoint

    International Nuclear Information System (INIS)

    Ungi, T.

    1997-01-01

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)

  6. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  7. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  8. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  9. Optimum policies for a system with general imperfect maintenance

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Lin, Y.-B.; Liao, G.-L.

    2006-01-01

    This study considers periodic preventive maintenance policies, which maximizes the availability of a repairable system with major repair at failure. Three types of preventive maintenance are performed, namely: imperfect preventive maintenance (IPM), perfect preventive maintenance (PPM) and failed preventive maintenance (FPM). The probability that preventive maintenance is perfect depends on the number of imperfect maintenances conducted since the previous renewal cycle, and the probability that preventive maintenance remains imperfect is not increasing. The optimum preventive maintenance time that maximizes availability is derived. Various special cases are considered. A numerical example is given

  10. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Science.gov (United States)

    2010-04-01

    ... Transportation Facility Maintenance Program A Appendix A to Subpart G Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... Transportation Facility Maintenance Program The following activities are eligible for BIA Transportation Facility...

  11. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  12. 77 FR 70846 - Regulatory Guide 1.182, “Assessing and Managing Risk Before Maintenance Activities at Nuclear...

    Science.gov (United States)

    2012-11-27

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0285] Regulatory Guide 1.182, ``Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants'' AGENCY: Nuclear Regulatory Commission... withdrawing Regulatory Guide (RG)1.182, Revision (Rev.) 0, ``Assessing and Managing Risk Before Maintenance...

  13. An effective manpower planning approach for maintenance ...

    African Journals Online (AJOL)

    The level of maintenance activities of a cocoa processing factory in Nigeria was studied. Data on critical machine parts involved in the maintenance work were collected and the different jobs carried out according to sections and nature of the activities were classified. The workloads for each type of maintenance activities ...

  14. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  15. Design and evaluation of augmented reality for nuclear power plant maintenance based on Cognitive activity analysis

    International Nuclear Information System (INIS)

    Koo, Jwa Jin

    2008-02-01

    The goals of maintenance in nuclear power plants (NPPs) are to reduce the number of plant shutdowns, to decrease the shutdown time, to minimize the maintenance costs, and to improve nuclear safety. Furthermore, it is difficult for maintenance personnel to conduct work in NPPs due to the complexity of NPPs, safety issues and time constraints. Human errors should be prevented to achieve maintenance goals in NPPs. Therefore, it is necessary to improve working conditions by introducing support systems. Augmented Reality (AR) has the potential to assist with maintenance tasks and make maintenance personnel concentrate on the tasks, which will then the reduced human error and improve human performance. The working procedure for AR systems was designed based on the characteristics of cognitive activity, and an experiment was conducted to estimate the effectiveness of AR. The results indicated that a well-designed working procedure for AR systems was more effective than a conventional paper-based working procedure. In addition, participants made fewer errors using the designed working procedure. AR systems as maintenance support systems are beneficial technology that can improve maintenance performance by reducing cognitive loads and unnecessary movements. An AR application can be attractive and effective at supporting maintenance task

  16. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  17. The long-term effects of switching from active intravenous bisphosphonate treatment to low-dose maintenance therapy in children with osteogenesis imperfecta.

    Science.gov (United States)

    Biggin, Andrew; Zheng, Linda; Briody, Julie N; Coorey, Craig P; Munns, Craig F

    2015-01-01

    Intravenous bisphosphonate therapy is the first-line treatment in moderate-to-severe osteogenesis imperfecta (OI), but there are varied treatment protocols with little data on long-term efficacy. This study evaluates the clinical outcomes when transitioning from active bisphosphonate treatment to maintenance therapy. A retrospective review was conducted on 17 patients before treatment, following active treatment (zoledronate 0.05 mg/kg 6-monthly or pamidronate 6-9 mg/kg/year) and after establishment on maintenance treatment for more than 2 years (zoledronate 0.025 mg/kg 6-monthly or pamidronate lean tissue mass increased during active treatment. These improvements were maintained during the period of maintenance treatment. Vertebral height improved in fractured thoracic vertebrae from pre-treatment to active therapy and improved further during maintenance treatment. Metacarpal cortical thickness and relative cortical area also increased over the treatment periods. Maintenance intravenous bisphosphonate therapy preserved the beneficial effects of active treatment at the doses stated above. Further studies are required to determine the optimal bisphosphonate treatment regimen in the management of children with OI. © 2015 S. Karger AG, Basel.

  18. In-vessel remote maintenance of the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Tabor, M.A.; Hager, E.R.; Creedon, R.L.; Fisher, M.V.; Atkin, S.D.

    1987-01-01

    The Compact Ignition Tokamak (CIT) is the first deuterium-tritium (D-T) fusion device that will study the physics of an ignited plasma. The ability of the tokamak vacuum vessel to be maintained remotely while under vacuum has not been fully demonstrated on previous machines, and this ability will be critical to the efficient and safe operation of ignition devices. Although manned entry into the CIT vacuum vessel will be possible during the nonactivated stages of operation, remotely automated equipment will be used to assist in initial assembly of the vessel as well as to maintain all in-vessel components once the D-T burn is achieved. Remote maintenance and operation will be routinely required for replacement of thermal protection tiles, inspection of components, leak detection, and repair welding activities. Conceptual design to support these remote maintenance activities has been integrated with the conceptual design of the in-vessel components to provide a complete and practical remote maintenance system for CIT. The primary remote assembly and maintenance operations on CIT will be accomplished through two dedicated 37- x 100-cm ports on the main toroidal vessel. Each port contains a single articulated boom manipulator (ABM), which is capable of accessing half of the torus. The proposed ABM consists of a movable carriage assembly, telescoping two-part mast, and articulated link sections. 1 ref

  19. Analysis of maintenance strategies

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.

    1998-01-01

    The main topics of the presentation include: (1) an analysis model and methods to evaluate maintenance action programs and the support decision to make changes in them and (2) to understand the maintenance strategies in a systems perspective as a basis for future developments. The subproject showed how systematic models for maintenance analysis and decision support, utilising computerised and statistical tool packages, can be taken into use for evaluation and optimisation of maintenance of active systems from the safety and economic point of view

  20. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  1. Maintenance in sustainable manufacturing

    Directory of Open Access Journals (Sweden)

    Vladimir Stuchly

    2014-09-01

    Full Text Available Background: Sustainable development is about reaching a balance between economic, social, and environmental goals, as well as people's participation in the planning process in order to gain their input and support. For a company, sustainable development means adoption of such business strategy and actions that contribute to satisfying present needs of company and stakeholders, as well as simultaneous protection, maintenance and strengthening of human and environmental potential which will be needed in the future. This new approach forces manufacturing companies to change their previous management paradigms. New management paradigm should include new issues and develop innovative methods, practices and technologies striving for solving problem of shortages of resources, softening environment overload and enabling development of environment-friendly lifecycle of products. Hence, its realization requires updating existing production models as they are based on previously accepted paradigm of unlimited resources and unlimited regeneration capabilities. Maintenance plays a crucial role because of its impact on availability, reliability, quality and life cycle cost, thus it should be one of the main pillars of new business running model.  Material and methods: The following paper is a result of research on the literature and observation of practices undertaken by a company within maintenance area. Results and conclusions: The main message is that considering sustainable manufacturing requires considerable expanding range of analysis and focusing on supporting processes. Maintenance offers numerous opportunities of decreasing influence of business processes on natural environment and more efficient resources utilization. The goal of maintenance processes realizing sustainable development strategy is increased profitability of exploitation and optimization of total lifecycle cost without disturbing safety and environmental issues. 

  2. N-of-1 study of weight loss maintenance assessing predictors of physical activity, adherence to weight loss plan and weight change.

    Science.gov (United States)

    Kwasnicka, Dominika; Dombrowski, Stephan U; White, Martin; Sniehotta, Falko F

    2017-06-01

    Behaviour change interventions are effective in supporting individuals to achieve clinically significant weight loss, but weight loss maintenance (WLM) is less often attained. This study examined predictive variables associated with WLM. N-of-1 study with daily ecological momentary assessment combined with objective measurement of weight and physical activity, collected with wireless devices (Fitbit™) for six months. Eight previously obese adults who had lost over 5% of their body weight in the past year took part. Data were analysed using time series methods. Predictor variables were based on five theoretical themes: maintenance motives, self-regulation, personal resources, habits, and environmental influences. Dependent variables were: objectively estimated step count and weight, and self-reported WLM plan adherence. For all participants, daily fluctuations in self-reported adherence to their WLM plan were significantly associated with most of the explanatory variables, including maintenance motivation and satisfaction with outcomes, self-regulation, habit, and stable environment. Personal resources were not a consistent predictor of plan adherence. This is the first study to assess theoretical predictions of WLM within individuals. WLM is a dynamic process including the interplay of motivation, self-regulation, habit, resources, and perceptions of environmental context. Individuals maintaining their weight have unique psychological profiles which could be accounted for in interventions.

  3. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  4. CAMKII activation is not required for maintenance of learning-induced enhancement of neuronal excitability.

    Directory of Open Access Journals (Sweden)

    Ori Liraz

    Full Text Available Pyramidal neurons in the piriform cortex from olfactory-discrimination trained rats show enhanced intrinsic neuronal excitability that lasts for several days after learning. Such enhanced intrinsic excitability is mediated by long-term reduction in the post-burst after-hyperpolarization (AHP which is generated by repetitive spike firing. AHP reduction is due to decreased conductance of a calcium-dependent potassium current, the sI(AHP. We have previously shown that learning-induced AHP reduction is maintained by persistent protein kinase C (PKC and extracellular regulated kinase (ERK activation. However, the molecular machinery underlying this long-lasting modulation of intrinsic excitability is yet to be fully described. Here we examine whether the CaMKII, which is known to be crucial in learning, memory and synaptic plasticity processes, is instrumental for the maintenance of learning-induced AHP reduction. KN93, that selectively blocks CaMKII autophosphorylation at Thr286, reduced the AHP in neurons from trained and control rat to the same extent. Consequently, the differences in AHP amplitude and neuronal adaptation between neurons from trained rats and controls remained. Accordingly, the level of activated CaMKII was similar in pirifrom cortex samples taken form trained and control rats. Our data show that although CaMKII modulates the amplitude of AHP of pyramidal neurons in the piriform cortex, its activation is not required for maintaining learning-induced enhancement of neuronal excitability.

  5. Comprehensive low-cost reliability centered maintenance. Final report

    International Nuclear Information System (INIS)

    Rotton, S.J.; Dozier, I.J.; Thow, R.

    1995-09-01

    Reliability Centered Maintenance (RCM) is a maintenance optimization approach that all electric utilities can apply to power plant systems. The Electric Power Research Institute and PECO Energy Company jointly sponsored this Comprehensive Low-Cost Reliability Centered Maintenance project to demonstrate that the standard RCM methodology could be streamlined to reduce the cost of analysis while maintaining a high quality product. EPRI's previous investigation of streamlined RCM methods being pioneered in the nuclear industry indicated that PECO Energy could expect to optimize its maintenance program at reduced cost by carefully controlling the scope without sacrificing documentation or technical quality. Using the insights obtained from these previous studies, three methods were defined in this project and were demonstrated in a large scale application to 60 systems at both the Limerick Generating Station and the Peach Bottom Atomic Power Station

  6. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  7. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  8. Basic study of the plant maintenance model considering plant improvement/modification

    International Nuclear Information System (INIS)

    Tsumaya, Akira; Inoue, Kazuya; Mochizuki, Masahito; Wakamatsu, Hidefumi; Arai, Eiji

    2007-01-01

    This paper proposes a maintenance activity model that considers not only routine maintenance activity but also functional maintenance including improvement/modification. Required maintenance types are categorized, and limitation of Activity Domain Integration Diagram (ADID) proposed by ISO18435 are discussed based on framework for life cycle maintenance management of manufacturing assets. Then, we proposed extension ADID model for plant maintenance activity model considering functional improvement/modification. (author)

  9. Creating Value by Integrating Logistic Trains Services and Maintenance Activities

    NARCIS (Netherlands)

    Busstra, Marten; van Dongen, Leonardus Adriana Maria

    2015-01-01

    NedTrain is the Netherlands Railway's subsidiary responsible for rolling stock maintenance. Train sets are brought in for short-term routine maintenance after set intervals of some 75 to 120 days. When a major defect occurs, train sets are allocated to one of the three maintenance depots and are

  10. Safe interruption of maintenance therapy against previous infection with four common HIV-associated opportunistic pathogens during potent antiretroviral therapy

    DEFF Research Database (Denmark)

    Kirk, Ole; Reiss, Peter; Uberti-Foppa, Caterina

    2002-01-01

    maintenance therapy for cytomegalovirus (CMV) end-organ disease, disseminated Mycobacterium avium complex (MAC) infection, cerebral toxoplasmosis, and extrapulmonary cryptococcosis in patients receiving antiretroviral therapy. DESIGN: Observational study. SETTING: Seven European HIV cohorts. PATIENTS: 358...... identified: 162 for CMV disease, 103 for MAC infection, 75 for toxoplasmosis, and 39 for cryptococcosis. During 781 person-years of follow-up, five patients had relapse. Two relapses (one of CMV disease and one of MAC infection) were diagnosed after maintenance therapy was interrupted when the CD4 lymphocyte....... One relapse (toxoplasmosis) was diagnosed after maintenance therapy interruption at a CD4 lymphocyte count greater than 200 x 10(6) cells/L for 15 months. The overall incidences of recurrent CMV disease, MAC infection, toxoplasmosis, and cryptococcosis were 0.54 per 100 person-years (95% CI, 0.07 to 1...

  11. The C-terminal domain of the bacterial SSB protein acts as a DNA maintenance hub at active chromosome replication forks.

    Directory of Open Access Journals (Sweden)

    Audrey Costes

    2010-12-01

    Full Text Available We have investigated in vivo the role of the carboxy-terminal domain of the Bacillus subtilis Single-Stranded DNA Binding protein (SSB(Cter as a recruitment platform at active chromosomal forks for many proteins of the genome maintenance machineries. We probed this SSB(Cter interactome using GFP fusions and by Tap-tag and biochemical analysis. It includes at least 12 proteins. The interactome was previously shown to include PriA, RecG, and RecQ and extended in this study by addition of DnaE, SbcC, RarA, RecJ, RecO, XseA, Ung, YpbB, and YrrC. Targeting of YpbB to active forks appears to depend on RecS, a RecQ paralogue, with which it forms a stable complex. Most of these SSB partners are conserved in bacteria, while others, such as the essential DNA polymerase DnaE, YrrC, and the YpbB/RecS complex, appear to be specific to B. subtilis. SSB(Cter deletion has a moderate impact on B. subtilis cell growth. However, it markedly affects the efficiency of repair of damaged genomic DNA and arrested replication forks. ssbΔCter mutant cells appear deficient in RecA loading on ssDNA, explaining their inefficiency in triggering the SOS response upon exposure to genotoxic agents. Together, our findings show that the bacterial SSB(Cter acts as a DNA maintenance hub at active chromosomal forks that secures their propagation along the genome.

  12. Remote maintenance design activities and research and development accomplishments for the compact ignition tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology in order to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (RF) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance operations internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For operations external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radioactive waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. (orig.)

  13. Building Maintenance Management System for Heritage Museum

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2012-09-01

    Full Text Available An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, category, location, and ownership. This study focuses on Building Maintenance Management System for Heritage Museum, which consists of two case studies in Penang State Museum and Art Gallery, Malaysia and Museum of Perak, Malaysia. The aim of this study is to propose methods to improve the maintenance management system for heritage museum. From the results, the common problem occurs during the implementation for the maintenance of each building is the budget for the maintenance and worker’s skill. The department of each museum must have their own maintenance unit to keep an eye on the maintenance activities for their buildings in order to improve the maintenance management system in their building.

  14. Criteria and model for assessing and improving information technology maturity within maintenance

    International Nuclear Information System (INIS)

    Kans, M; Ehsanifard, K; Moniri, A

    2012-01-01

    Maintenance optimization and decision-making processes have been both influenced considerably by Information Technology (IT) developments mainly by increasing data availability. The decision-making process in its turn has affected systems trustworthiness positively. Therefore, theoretically speaking it could be said that Maintenance Management Information technology (MMIT) has the potential to provide applicable solutions for many of the maintenance management problems. Nevertheless, this potential has been hardly experienced in practice because of the mismatch between the level of IT maturity in the organizations and their selected MMIT solutions. To fill this gap this paper suggests a number of criteria which are crucial in decision making for selecting a MMIT application. The criteria are formed based on previous findings utilising an extensive literature review. A model is further developed for this purpose which is also tested on a case company active in power generation in Sweden. The model proved to be helpful when taking further improvement steps for reaching high utilization of IT in maintenance.

  15. Alternative cask maintenance facility concepts

    International Nuclear Information System (INIS)

    Attaway, C.R.; Pope, R.B.; Wiliamson, A.C.; Medley, L.G.; Shappert, L.B.

    1992-01-01

    In this paper, the results of three trade-off studies of alternative concepts for performing cask maintenance for Civilian Radioactive Waste Management System casks are presented. An earlier study resulted in a recommendation that a submerged pool concept for cask internal component removal be used in the design of a Cask Maintenance Facility. The first trade-off study resulted in confirming the previous recommendation that a submerged pool concept be used rather than an isolation cell; the basis for this continued recommendation is discussed. The second study provides an evaluation of the previously proposed facility for the capability of handling an increased quantity of OCRWM casks. The third study provides a preliminary concept for adding the capability to repaint the exterior cylindrical portions of casks

  16. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  17. Machine Maintenance Scheduling with Reliability Engineering Method and Maintenance Value Stream Mapping

    Science.gov (United States)

    Sembiring, N.; Nasution, A. H.

    2018-02-01

    Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.

  18. Lifetime oriented maintenance planning in the Netherlands

    NARCIS (Netherlands)

    Straub, A.

    2003-01-01

    In this paper we set up a framework for lifetime oriented maintenance planning as an outcome and input for strategic housing stock management. The maintenance planning holds maintenance activities and costs in the longer term. We consider the maintenance planning as a tool to calculate and implement

  19. Manpower development for safe operation of nuclear power plant. China. Advice on maintenance planning. Activity: 3.1.2-Task-06. Technical report

    International Nuclear Information System (INIS)

    Chihara, Y.; Imai, K.

    1996-01-01

    Regarding the matter of quality assurance related to maintenance activities, we provided appropriate advice on the details of maintenance technologies and on quality control for the nuclear power plant. The advice was provided based on our experience in Japan, with explanations made from specialists' points of view in the form of a lecture. This also included an exchange of questions and answers regarding our experiences with quality control and maintenance activities in Japan

  20. Physical activity maintenance among Spanish-speaking Latinas in a randomized controlled trial of an Internet-based intervention.

    Science.gov (United States)

    Hartman, Sheri J; Dunsiger, Shira I; Bock, Beth C; Larsen, Britta A; Linke, Sarah; Pekmezi, Dori; Marquez, Becky; Gans, Kim M; Mendoza-Vasconez, Andrea S; Marcus, Bess H

    2017-06-01

    Spanish-speaking Latinas have some of the lowest rates of meeting physical activity guidelines in the U.S. and are at high risk for many related chronic diseases. The purpose of the current study was to examine the maintenance of a culturally and individually-tailored Internet-based physical activity intervention for Spanish-speaking Latinas. Inactive Latinas (N  =  205) were randomly assigned to a 6-month Tailored Physical Activity Internet Intervention or a Wellness Contact Control Internet Group, with a 6-month follow-up. Maintenance was measured by assessing group differences in minutes per week of self-reported and accelerometer measured moderate to vigorous physical activity (MVPA) at 12 months after baseline and changes in MVPA between the end of the active intervention (month 6) and the end of the study (month 12). Potential moderators of the intervention were also examined. Data were collected between 2011 and 2014, and were analyzed in 2015 at the University of California, San Diego. The Intervention Group engaged in significantly more minutes of MVPA per week than the Control Group at the end of the maintenance period for both self-reported (mean diff. = 30.68, SE = 11.27, p = .007) and accelerometer measured (mean diff. = 11.47, SE = 3.19, p = .01) MVPA. There were no significant between- or within-group changes in MVPA from month 6 to 12. Greater intervention effects were seen for those with lower BMI (BMI × intervention = -6.67, SE = 2.88, p = .02) and lower perceived places to walk to in their neighborhood (access × intervention = -43.25, SE = 19.07, p = .02), with a trend for less family support (social support × intervention = -3.49, SE = 2.05, p = .08). Acculturation, health literacy, and physical activity related psychosocial variables were not significant moderators of the intervention effect during the maintenance period. Findings from the current study support the efficacy of an Internet

  1. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  2. Review on Japanese activities in the field of maintenance and repair of LMFBR steam generators

    International Nuclear Information System (INIS)

    Tsuchiya, T.; Fukuda, T.; Sato, M.; Okabayashi, K.; Takahashi, T.

    2002-01-01

    Summary of Japanese activities on maintenance and repair of LMFBR steam generators (SG) is described in this paper. The concept (adoption of helical coil tube etc.) of MONJU SG was established in conceptional design started from 1968, and research and development (R and D) program was prepared. Parallel with basic studies such as material, welding, sodium water reaction and etc., overall verification tests using mock up SGs were conducted. As the first step, 1 Mw SG with two active helical tubes (and eight dummy tubes) was fabricated and operated, and many maintenance and repair experiences were accumulated through two small water leak troubles. Two 50Mw SGs, 1/5 scale of MONJU SG, were constructed and operated for long time. Post test examinations were carried out for No.1 50 Mw SG and feasibility of this type of SG was confirmed. In regard to maintenance and repair techniques, explosive and welding method for tube plugging and UT and ECT techniques for inspection of tube integrity are under development. Overall verification test for on-site and in-factory maintenance and repair techniques was conducted using No.2 50Mw SG evaporator and applicability of those techniques to real plant was evaluated. Many experiences were accumulated for removal and cleaning of sodium water reaction products after sodium water reaction in the cooling system and pressure relief system, using the Large Sodium Water Reaction Test Facility (SWAT-1 and 3). (author)

  3. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  4. Maintenance implementation plan for the B Plant/WESF. Revision 4

    International Nuclear Information System (INIS)

    Tritt, S.E.; Lueck, B.H.

    1996-01-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing

  5. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  6. Determinants and benefits of physical activity maintenance in hospital employees.

    Science.gov (United States)

    Lavoie-Tremblay, Mélanie; Sounan, Charles; Martin, Kara; Trudel, Julie G; Lavigne, Genevieve L; Grover, Steven A; Lowensteyn, Ilka

    2014-01-01

    This study investigated whether the positive behavioral and anthropometric outcomes of a pedometer-based physical activity 8-week challenge were maintained 6 months after the end of the program. It further investigated the motivational profile of those who maintained their physical activity levels in the months following the end of the program and of those who did not. Hospital employees from a university-affiliated multisite health care center in Canada participated using a questionnaire. Of the 235 participants who completed the 8-week challenge, 157 questionnaires were returned 6 months later. Paired-samples t tests were conducted between the baseline and follow-up scores as well as between the postprogram and follow-up scores to detect significant differences between the measurement points. This study shows that the pedometer-based physical activity helped hospital employees maintain a high level of physical activity as well as maintain a healthy body mass index after 6 months. The results demonstrated that during maintenance the high physical activity group obtained higher scores for identified regulation and intrinsic regulation compared with the other groups. The results of the study revealed that identified and intrinsic regulations are important contributors to maintaining physical activity among hospital employees.

  7. Susquehanna SES maintenance supervisor training and certification

    International Nuclear Information System (INIS)

    Deckman, M.

    1991-01-01

    Susquehanna's program targets all Supervisors, Supervisor Candidates, and Temporary Supervisors that are responsible for in-plant maintenance or maintenance support activities, including: mechanical maintenance; electrical maintenance; maintenance support (labor support, radwaste, etc.); mobile construction support (mechanical and electrical); chemistry; health physics; maintenance planning; and instrument and controls. The program integrates the three major areas of direct Supervisory responsibilities: (1) Leadership and Management - Skills that require interpersonal activities that are typically humanistic and subjective; such as coaching, motivating, communications, etc. (2) Technical and Administrative - Knowledge that is directly related to the job of Supervising from the production, regulatory, accountability perspective. These topics are very objective and include training on topics such as workpackages, plant chemistry parameters, radiological concerns, etc. (3) Technical Skills - Ensure each Supervisor is technically competent in the plant systems, components, or equipment he/she is tasked with maintaining or overseeing. Typical skills found in this area are, circuit breaker maintenance, primary system sampling, or overhauling pumps

  8. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  9. Nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Nuclear power plants maintenance now appears as an important factor contributing to the competitivity of nuclea energy. The articles published in this issue describe the way maintenance has been organized in France and how it led to an actual industrial activity developing and providing products and services. An information note about Georges Besse uranium enrichment plant (Eurodif) recalls that maintenance has become a main data not only for power plants but for all nuclear industry installations. (The second part of this dossier will be published in the next issue: vol. 1 January-February 1989) [fr

  10. Thermoeconomic studies applied to maintenance of power plants

    International Nuclear Information System (INIS)

    Carvalho, F.R.; Horta Nogueira, L.A.

    1996-01-01

    The thermoeconomic method is an important tool aiming to improve maintenance activities in steam power plants, becoming possible to share the irreversibilities costs to each equipment, as boilers, turbines and heat exchangers. Furthermore, the effects related to changes in operational and design parameters can be studied in a detailed way, evaluating the local and distributed effects. In this work, after a brief review of power plant maintenance costs concepts and values, one address a methodology for maintenance costs estimation and develops a case study of thermoeconomics of a hypothetical plant, presenting the exergy flows, exergy losses and maintenance costs distribution. Also is presented an evaluation of exergoeconomic maintenance cost, evaluating their significance, at equipment level, related to overall maintenance cost, aiming to help the maintenance activities planning. 10 refs, 3 figs, 12 tabs

  11. Preventive and Predictive Maintenance, Warehousing of Spares, Periodic Testing and In-Service Inspection Activities at the Nigerian Research Reactor-1 Facility

    Energy Technology Data Exchange (ETDEWEB)

    Yusuf, I.; Mati, A. A.; Dewu, B. B.M., [Centre for Energy Research and Training, Ahmadu Bello University, Zaria (Nigeria)

    2014-08-15

    The Nigerian Research Reactor–1, or NIRR-1, is sited at Centre for Energy Research and Training, Ahmadu Bello University, Zaria, Nigeria. Activities on preventive or routine maintenance have been institutionalized since the commissioning of the reactor in February 2004. This has grossly reduced the rates of corrective maintenance activities and helped the reactor management a great deal in predicting failure rates of reactor components and other auxiliary units. Routine maintenance of systems and components are being carried out on a weekly, quarterly and annual basis based on manufacturer’s recommendations, which have been reviewed and improved over the years. The paper presents the implementation of maintenance activities in NIRR-1 from its initial criticality in 2004 till today and the new scheme for periodic testing and in-service-inspection developed after an IAEA Integrated Safety Assessment of Research Reactors mission. The measures put in place are envisaged to reduce the negative impact of ageing on NIRR-1 and its auxiliary systems. (author)

  12. Building Maintenance. Reading and Language Activities.

    Science.gov (United States)

    Kessman, William A.

    The student manual has been designed primarily for beginning students in a high school level vocational program in building maintenance. A workbook for special needs students, the document does not cover all areas of custodial training but has been written for the purpose of refining the basic skills of reading comprehension, vocabulary building,…

  13. Building Maintenance Management System for Heritage Museum

    OpenAIRE

    Md Azree Othuman Mydin; Siti Hajar Ismail; Norhidayah Md Ulang

    2012-01-01

    An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, ...

  14. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  15. A Human Error Analysis Procedure for Identifying Potential Error Modes and Influencing Factors for Test and Maintenance Activities

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Park, Jin Kyun

    2010-01-01

    Periodic or non-periodic test and maintenance (T and M) activities in large, complex systems such as nuclear power plants (NPPs) are essential for sustaining stable and safe operation of the systems. On the other hand, it also has been raised that human erroneous actions that might occur during T and M activities has the possibility of incurring unplanned reactor trips (RTs) or power derate, making safety-related systems unavailable, or making the reliability of components degraded. Contribution of human errors during normal and abnormal activities of NPPs to the unplanned RTs is known to be about 20% of the total events. This paper introduces a procedure for predictively analyzing human error potentials when maintenance personnel perform T and M tasks based on a work procedure or their work plan. This procedure helps plant maintenance team prepare for plausible human errors. The procedure to be introduced is focusing on the recurrent error forms (or modes) in execution-based errors such as wrong object, omission, too little, and wrong action

  16. On-line maintenance PSA support at NPP Krsko

    International Nuclear Information System (INIS)

    Prosen, R.; Vrbanic, I.; Kastelan, M.

    2000-01-01

    In 1997 Krsko NPP initiated the on-line maintenance (OLM) practice. On-line maintenance constitutes of corrective activities, preventive activities, surveillance activities, tests and inspections, as well as calibrations and modifications, taking place during the normal power operations. The on-line maintenance is a multidisciplinary process consisting of activity specification, planning, and preparation and performing of the OLM activity of interest. The primary role of the PSA group is to assess from the r isk perspective , using the plant-specific NEK PSA model, system unavailability and the impact to the plant operational risk. The intent is to support planning of the on-line maintenance activities from the risk perspective. The risk evaluation of the OLM activities is based on the probability of core damage evaluation for the defined discrete plant configuration states, determined by the OLM activities. Within this application, the optimized, plant-specific PSA model is used on Risk Spectrum platform. To perform the risk assessment of the on-line maintenance activities, first the systems to be affected are defined based on the planned OLM activities. The next important step is the assessment of the planned work schedule. To define the final schedule, the co-ordination and optimizing the planned OLM activities needs activation of all participating departments, supported also from PSA group. The P3 (i.e. Primavera) planning tool system windows are defined for different systems and groups of systems, and the activities are sorted in particular weeks according to these windows. (author)

  17. Annual summary report on the surveillance and maintenance activities for the Oak Rige National Laboratory Environmental Restoration Program for fiscal year 1995

    International Nuclear Information System (INIS)

    1995-11-01

    This Annual Summary Report on the Surveillance and Maintenance Activities for the Oak Ridge National Laboratory Environmental Restoration Program for Fiscal Year 1995 was prepared to communicate the accomplishments of the Program during fiscal year 1995. This work was performed under work breakdown structure element 1.4.12.6.1.14.20 (activity data sheet 3314, ''Remedial Action Surveillance and Maintenance''). Publication of this document meets the Life Cycle Baseline milestone date of November 30, 1995. This document provides the accomplishments for both the Remedial Action and Decontamination and Decommissioning Surveillance and Maintenance programs

  18. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  19. A joint spare part and maintenance inspection optimisation model using the Delay-Time concept

    International Nuclear Information System (INIS)

    Wang Wenbin

    2011-01-01

    Spare parts and maintenance are closely related logistics activities where maintenance generates the need for spare parts. When preventive maintenance is present, it may need more spare parts at one time because of the planned preventive maintenance activities. This paper considers the joint optimisation of three decision variables, e.g., the ordering quantity, ordering interval and inspection interval. The model is constructed using the well-known Delay-Time concept where the failure process is divided into a two-stage process. The objective function is the long run expected cost per unit time in terms of the three decision variables to be optimised. Here we use a block-based inspection policy where all components are inspected at the same time regardless of the ages of the components. This creates a situation that the time to failure since the immediate previous inspection is random and has to be modelled by a distribution. This time is called the forward time and a limiting but closed form of such distribution is obtained. We develop an algorithm for the optimal solution of the decision process using a combination of analytical and enumeration approaches. The model is demonstrated by a numerical example. - Highlights: → Joint optimisation of maintenance and spare part inventory. → The use of the Delay-Time concept. → Block-based inspection. → Fixed order interval but variable order quantity.

  20. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Doyle, E.K.; Lee, C.-G.; Cho, D.

    2005-01-01

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  1. Maintenance of physical activity in patients with rheumaoid arthritis

    DEFF Research Database (Denmark)

    Løppenthin, Katrine; Esbensen, Bente Appel; Østergaard, Mikkel

    2012-01-01

    , described experiences of bodily well-being and liberation from illness provided and secured through PA maintenance. The understanding of regular PA as a resistance resource is essential to development future health promoting interventions aimed to encourage PA maintenance in patients with RA........ The analysis was discussed within a multidisciplinary team of qualitative researchers. Results: The analysis revealed tree dimensions of PA maintenance: (1) A bodily dimension: physical sensations of vitality, sparkling energy and liberation in movement; (2) a mental component: referring to experiences of self...... the participants to adjust to the uncertainty of the illness and preserving hope for a future dominated as little as possible by illness. Conclusions: While RA usually forces a negative attention to joint pain, fatigue and limited mobility in parts of the body, the participants in this study, despite illness...

  2. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  3. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  4. Remote maintenance for fusion experimental reactor

    International Nuclear Information System (INIS)

    Koizumi, Koichi; Takeda, Nobukazu

    2000-01-01

    Here was introduced on maintenance of reactor core portion operated by remote control among maintenance of the International Thermonuclear Experimental Reactor (ITER) begun on its design since 1988 under international cooperation of U.S.A., Europe, Russia and Japan. Every appliances constructing the reactor core portion is necessary to carry out all of their inspection and maintenance by using remote controlled apparatus because of their radiation due to neutron generated by DT combustion of plasma. For engineering design activity (EDA) in ITER, not only design and development of the remote control appliances but also design under consideration of remote maintenance for from structural design of maintained objective appliances to access method to appliances, transportation and preservation method of radiated matters, and out-reactor maintenance in a hot cell, is now under progress. Here were also reported on basic concept on maintenance and conservation of ITER, maintenance design of diverter and blanket with high maintenance frequency and present state on development of maintenance appliances. (G.K.)

  5. Safety related maintenance in the framework of the reliability centered maintenance concept

    International Nuclear Information System (INIS)

    1992-07-01

    Elevated safety requirements and ever increasing costs of maintenance of nuclear power plants stimulate the interest in different methods and approaches to optimize maintenance activities. Among different concepts, the Reliability Centered Maintenance (RCM) as an approach to improve Preventive Maintenance (PM) programmes is being widely discussed an applied in several IAEA Member States. In order to summarize basic principles and current implementation of the RCM, the IAEA organized a Consultants Meeting in November 1990. The report prepared during that meeting was discussed during the Technical Committee Meeting (TCM) held in May 1991. Numerous technical presentations as well as panel and plenary discussions took place at the TCM. This document contains the report of the Consultants Meeting (modified to include comments of the TCM), a summary of the most important discussions as well as all 14 papers presented at the TCM

  6. A process for risk-focused maintenance

    International Nuclear Information System (INIS)

    Lofgren, E.V.; Cooper, S.E.; Kurth, R.E.; Phillips, L.B.

    1991-03-01

    This report presents a process for focusing maintenance resources on components that enable nuclear plant systems to perform their essential functions and on components whose failure may initiate challenges to safety systems, so as to have the greatest impact in decreasing risk. The process provides criteria, based on risk, for deciding which components are critical to risk and determining what maintenance activities are required to ensure reliable operation of those risk-critical components. Two approaches are provided for selection of risk-critical components. One approach uses the results of a Probabilistic Risk Assessment (PRA); the other is based on the methodology developed for this report, which has a basis in PRA although it does not use the results of a PRA study. Following identification of risk-critical components, both approaches use a single methodology for determining what maintenance activities are required to ensure reliable operation of the identified components. The report also provides demonstrations of application of the two approaches to selection of risk-critical components and demonstrations of application of the methodology for determining what maintenance activities are required to an active standby safety system, a normally operating system, and passive components. 5 refs., 11 figs., 1 tab

  7. A process for risk-focused maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lofgren, E.V.; Cooper, S.E.; Kurth, R.E.; Phillips, L.B. (Science Applications International Corp., McLean, VA (USA))

    1991-03-01

    This report presents a process for focusing maintenance resources on components that enable nuclear plant systems to perform their essential functions and on components whose failure may initiate challenges to safety systems, so as to have the greatest impact in decreasing risk. The process provides criteria, based on risk, for deciding which components are critical to risk and determining what maintenance activities are required to ensure reliable operation of those risk-critical components. Two approaches are provided for selection of risk-critical components. One approach uses the results of a Probabilistic Risk Assessment (PRA); the other is based on the methodology developed for this report, which has a basis in PRA although it does not use the results of a PRA study. Following identification of risk-critical components, both approaches use a single methodology for determining what maintenance activities are required to ensure reliable operation of the identified components. The report also provides demonstrations of application of the two approaches to selection of risk-critical components and demonstrations of application of the methodology for determining what maintenance activities are required to an active standby safety system, a normally operating system, and passive components. 5 refs., 11 figs., 1 tab.

  8. Food activities and identity maintenance in old age: a systematic review and meta-synthesis.

    Science.gov (United States)

    Plastow, Nicola Ann; Atwal, Anita; Gilhooly, Mary

    2015-01-01

    Services provided to older people should be developed based on active ageing policies. Nutrition is one aspect of active ageing, but little is known about how food activities contribute to psychological well-being in later life. This is a systematic review of qualitative and quantitative research that answers the question 'What is known about the relationship between food activities and the maintenance of identities in old age?'. We followed the preferred reporting items for systematic reviews and meta-analyses guidelines and used quality assessment parameters to complete a systematic review and narrative synthesis. Academic Search Premier, MEDLINE, CINAHL Plus, and PsycINFO databases were searched. We initially identified 8016 articles, of which 167 full-text articles were screened for inclusion. Twenty-two articles were included in the review. There was moderate evidence from nine qualitative and two quantitative studies, of variable quality, that food activities contribute to the maintenance of women's gendered identities, the ethnic identities of men and women, and community identities. There was moderate evidence from 10 qualitative studies, of variable quality, that a change in food choice and deteriorating health changed food activity participation. These changes threatened identities. Most studies included both younger adults and older adults. In later life, there are many life experiences leading to change. Further research is needed to develop understanding of how identity and mental well-being are maintained, despite changes in everyday activities like cooking and eating. This may enable health care professionals to meet psychological needs alongside biological needs during nutritional interventions.

  9. On-Line Maintenance Methodology Development

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyo Won; Kim, Jae Ho; Jae, Moo Sung [Hanyang University, Seoul (Korea, Republic of)

    2012-05-15

    Most of domestic maintenance activities for nuclear power plants are performed while overhaul. Therefore, On-Line Maintenance (OLM) is one of the proper risks informed application techniques for diffusing maintenance burden during overhaul with safety of the plant is secured. The NUMARC 93-01 (Rev.3) presents the OLM state of the art and it provides methodology. This study adopts NUMARC 93-01 (Rev.3) and present OLM. The reference component is Emergency Diesel Generator (EDG) of Ulchin 3, 4

  10. Randomized Phase II trial of paclitaxel and carboplatin followed by gemcitabine switch-maintenance therapy versus gemcitabine and carboplatin followed by gemcitabine continuation-maintenance therapy in previously untreated advanced non-small cell lung cancer

    Directory of Open Access Journals (Sweden)

    Minami Seigo

    2013-01-01

    Full Text Available Abstract Background In recent years, maintenance chemotherapy is increasingly being recognized as a new treatment strategy to improve the outcome of advanced non-small cell lung cancer (NSCLC. However, the optimal maintenance strategy is still controversial. Gemcitabine is a promising candidate for single-agent maintenance therapy because of little toxicity and good tolerability. We have conducted a randomized phase II study to evaluate the validity of single-agent maintenance chemotherapy of gemcitabine and to compare continuation- and switch-maintenance. Methods Chemonaïve patients with stage IIIB/IV NSCLC were randomly assigned 1:1 to either arm A or B. Patients received paclitaxel (200 mg/m2, day 1 plus carboplatin (AUC 6 mg/mL/min, day 1 every 3 weeks in arm A, or gemcitabine (1000 mg/m2, days 1 and 8 plus carboplatin (AUC 5 mg/mL/min, day1 every 3 weeks in arm B. Non-progressive patients following 3 cycles of induction chemotherapy received maintenance gemcitabine (1000 mg/m2, days 1 and 8 every 3 weeks. (Trial registration: UMIN000008252 Results The study was stopped because of delayed accrual at interim analysis. Of the randomly assigned 50 patients, 49 except for one in arm B were evaluable. Median progression-free survival (PFS was 4.6 months for arm A vs. 3.5 months for arm B (HR = 1.03; 95% CI, 0.45–2.27; p = 0.95 and median overall survival (OS was 15.0 months for arm A vs. 14.8 months for arm B (HR = 0.79; 95% CI, 0.40–1.51; p = 0.60, showing no difference between the two arms. The response rate, disease control rate, and the transit rate to maintenance phase were 36.0% (9/25, 64.0% (16/25, and 48% (12/25 for arm A vs. 16.7% (4/24, 50.0% (12/24, and 33% (8/24 for arm B, which were also statistically similar between the two arms (p = 0.13, p = 0.32, and p = 0.30, respectively. Both induction regimens were tolerable, except that more patients experienced peripheral neuropathy in arm A. Toxicities during

  11. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun

    2009-01-01

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors

  12. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2009-05-15

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors.

  13. Prediction of attendance at fitness center: a comparison between the theory of planned behavior, the social cognitive theory, and the physical activity maintenance theory

    OpenAIRE

    Jekauc, Darko; Völkle, Manuel; Wagner, Matthias O.; Mess, Filip; Reiner, Miriam; Renner, Britta

    2015-01-01

    In the processes of physical activity (PA) maintenance specific predictors are effective, which differ from other stages of PA development. Recently, Physical Activity Maintenance Theory (PAMT) was specifically developed for prediction of PA maintenance. The aim of the present study was to evaluate the predictability of the future behavior by the PAMT and compare it with the Theory of Planned Behavior (TPB) and Social Cognitive Theory (SCT). Participation rate in a fitness center was observed...

  14. Nuclear power plant maintenance optimisation SENUF network activity

    International Nuclear Information System (INIS)

    Ahlstrand, R.; Bieth, M.; Pla, P.; Rieg, C.; Trampus, P.

    2004-01-01

    During providing scientific and technical support to TACIS and PHARE nuclear safety programs a large amount of knowledge related to Russian design reactor systems has accumulated and led to creation of a new Network concerning Nuclear Safety in Central and Eastern Europe called ''Safety of Eastern European type Nuclear Facilities'' (SENUF). SENUF contributes to bring together all stakeholders of TACIS and PHARE: beneficiaries, end users, Eastern und Western nuclear industries, and thus, to favour fruitful technical exchanges and feedback of experience. At present the main focus of SENUF is the nuclear power plant maintenance as substantial element of plant operational safety as well as life management. A Working Group has been established on plant maintenance. One of its major tasks in 2004 is to prepare a status report on advanced strategies to optimise maintenance. Optimisation projects have an interface with the plant's overall life management program. Today, almost all plants involved in SENUF network have an explicit policy to extend their service life, thus, component ageing management, modernization and refurbishment actions became much more important. A database is also under development, which intends to help sharing the available knowledge and specific equipment and tools. (orig.)

  15. Optimal Medical Equipment Maintenance Service Proposal Decision Support System combining Activity Based Costing (ABC) and the Analytic Hierarchy Process (AHP).

    Science.gov (United States)

    da Rocha, Leticia; Sloane, Elliot; M Bassani, Jose

    2005-01-01

    This study describes a framework to support the choice of the maintenance service (in-house or third party contract) for each category of medical equipment based on: a) the real medical equipment maintenance management system currently used by the biomedical engineering group of the public health system of the Universidade Estadual de Campinas located in Brazil to control the medical equipment maintenance service, b) the Activity Based Costing (ABC) method, and c) the Analytic Hierarchy Process (AHP) method. Results show the cost and performance related to each type of maintenance service. Decision-makers can use these results to evaluate possible strategies for the categories of equipment.

  16. A study on autonomous maintenance robot, 7

    International Nuclear Information System (INIS)

    Fukuda, Toshio; Hosokai, Hidemi; Shimasaka, Naoki; Kaneshige, Masanori; Iwasaki, Shinnosuke.

    1990-01-01

    This paper deals with the new mechanism of a new maintenance robot, Mark IV, following the previous reports on pipeline inspection and maintenance robots of Mark I, II, and III. The Mark IV has a mechanism capable of inspecting surfaces of storage tanks as well as pipeline outer surfaces, which is another capability of the maintenance robots, different from the previous ones. The main features of Mark IV are as follows, (i) The robot has a multijoint structure, so that it has better adaptability to the curvartures of pipelines and storage tanks. (ii) The joint of the robot has SMA actuators to make the robot lighter in weight. Some actuator shape characteristics are also examined for the robot structure and control. (iii) The robot has suckers at both ends so that the robot can climb up along the wall from the ground. (iv) A robot with the inch worm mechanisms has many functional motions, such that it can pass over flanges and T-joints, and transfer to adjacent pipelines with a wider range of pipe diameters. (v) A control method is given for the mobile motion control. Thus, the functional level of the maintenance robot has been greatly improved by the introduction of the Mark IV robot. (author)

  17. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  18. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  19. Laboratory simulation of maintenance activity

    International Nuclear Information System (INIS)

    Kantowitz, B.H.

    1988-01-01

    Laboratory research in highly controlled settings can augment, but not replace, studies in plant or training center locations. A laboratory simulation involves abstraction of the human information processing and social interactions required in prototypical maintenance tasks. A variety of independent variables can be studied quickly, efficiently, and at relatively low cost. Sources of human error can be identified in terms of models of human perception, cognition, action, attention, and social/organizational processes. This paper discusses research in progress at the Battelle Human Performance Laboratory. Both theoretical aspects and practical implications are considered. Directions for future human factors research are indicated

  20. Retendering of ST-CV maintenance contract

    CERN Document Server

    Battistin, M

    2003-01-01

    During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the...

  1. Guide for generic application of Reliability Centered Maintenance (RCM) recommendations

    International Nuclear Information System (INIS)

    Schwan, C.A.; Toomey, G.E.; Morgan, T.A.; Darling, S.S.

    1991-02-01

    Previously completed reliability centered maintenance (RCM) studies form the basis for developing or refining a preventive maintenance program. This report describes a generic methodology that will help utilities optimize nuclear plant maintenance programs using RCM techniques. This guide addresses the following areas: history of the generic methodology development process, and use of the generic methodology for conducting system-to-system and component-to-component evaluations. 2 refs., 2 figs., 5 tabs

  2. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  3. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1997-01-01

    This paper both describes the overall design concept of the ITER remote maintenance system, which has been developed mainly for use with in-vessel components such as divertor and blanket, and outlines of the ITER R and D program, which has been established to develop remote handling equipment/tools and radiation hard components. In ITER, the reactor structures inside cryostat have to be maintained remotely because of activation due to DT operation. Therefore, remote-handling technology is fundamental, and the reactor-structure design must be made consistent with remote maintainability. The overall maintenance scenario and design concepts of the required remote handling equipment/tools have been developed according to their maintenance classification. Technologies are also being developed to verify the feasibility of the maintenance design and include fabrication and testing of a fullscale remote-handling equipment/tools for in-vessel maintenance. (author)

  4. Probabilistic approach to rationalization of plants maintenance

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Uchimoto, Tetsuya; Miya, Kenzo

    2001-01-01

    Since there are a lot of equipments in large plants, their safety and reliability cannot be kept as high level as designed without maintenance activities. Then preventive maintenance is intensively executed in some large plants. However, it will be inefficient to perform the preventive maintenance blindly. To make maintenance activities effective, it is essential to identify the critical equipments influencing plant safety and/or reliability and carry out the maintenance by focusing attentions on these equipments. It needs quantitative analyses to identify the critical equipments based on the data of failure rates. However, complete data set of failure rates cannot necessarily be available for some plants such as nuclear power plants. In this study, we carry out the reliability analysis for generic LNG plant and calculate various quantitative risk importance measures for each equipment. We propose rather qualitative representations for some quantitative measures, considering the situation without complete data set and conclude that it is possible to rationalize maintenance procedure by using these rather qualitative measures, though the level of rationalization is of course limited. (author)

  5. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  6. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  7. Valves maintenance management in nuclear power plants

    International Nuclear Information System (INIS)

    Trost, J.

    2001-01-01

    The deregulation of Europe's power market will force nuclear power plant operators to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing expenditure on maintenance. Framatome ANP GmbH, in cooperation with plant operators is currently developing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. (Author)

  8. Augmented reality application utility for aviation maintenance work instruction

    Science.gov (United States)

    Pourcho, John Bryan

    Current aviation maintenance work instructions do not display information effectively enough to prevent costly errors and safety concerns. Aircraft are complex assemblies of highly interrelated components that confound troubleshooting and can make the maintenance procedure difficult (Drury & Gramopadhye, 2001). The sophisticated nature of aircraft maintenance necessitates a revolutionized training intervention for aviation maintenance technicians (United States General Accounting Office, 2003). Quite simply, the paper based job task cards fall short of offering rapid access to technical data and the system or component visualization necessary for working on complex integrated aircraft systems. Possible solutions to this problem include upgraded standards for paper based task cards and the use of integrated 3D product definition used on various mobile platforms (Ropp, Thomas, Lee, Broyles, Lewin, Andreychek, & Nicol, 2013). Previous studies have shown that incorporation of 3D graphics in work instructions allow the user to more efficiently and accurately interpret maintenance information (Jackson & Batstone, 2008). For aircraft maintenance workers, the use of mobile 3D model-based task cards could make current paper task card standards obsolete with their ability to deliver relevant, synchronized information to and from the hangar. Unlike previous versions of 3D model-based definition task cards and paper task cards, which are currently used in the maintenance industry, 3D model based definition task cards have the potential to be more mobile and accessible. Utilizing augmented reality applications on mobile devices to seamlessly deliver 3D product definition on mobile devices could increase the efficiency, accuracy, and reduce the mental workload for technicians when performing maintenance tasks (Macchiarella, 2004). This proposal will serve as a literary review of the aviation maintenance industry, the spatial ability of maintenance technicians, and benefits of

  9. PWSCC Preventive Maintenance Activities for Alloy 600 in Japanese PWR Plants

    International Nuclear Information System (INIS)

    Yamamoto, K.; Sugimoto, N.; Onishi, K.; Okimura, K.

    2012-01-01

    Because many nuclear plants have been in operation for ages, the importance of preventive maintenance technologies is getting higher. One conspicuous problem found in pressurized water reactor (PWR) plants is the primary water stress corrosion cracking (PWSCC) observed in Alloy 600 (a kind of high nickel based alloy) parts. Alloy 600 was used for butt welds between low alloy steel and stainless steel of nozzles of Reactor Vessel (RV), Steam Generator (SG), and Pressurizer (Pz). As PWSCC occurred at these parts may cause Loss of Coolant Accident (LOCA), preventive maintenance is necessary. PWSCC is considered to be caused by a mixture of three elements: high residual tensile stress on surface, material (Alloy 600) and environment. PWSCC can be prevented by improving one of the elements. MHI has been developing stress improvement methods, for example, Water Jet Peening (WJP), Shot Peening by Ultrasonic vibration (USP), and Laser Stress Improvement Process (L-SIP). According to the situation, appropriate method is applied for each part. WJP has been applied for RV nozzles of a lot of plants in Japan. However PWSCC was observed in RV nozzles during the inspection before WJP in recent years, MHI developed the Advanced INLAY system to improve the material from Alloy 600 to Alloy 690. Alloy 600 on the inner surface of the nozzles is removed and welding with Alloy 690 is performed. In addition, heat treatments for the nozzles are difficult for its structural situation, so ambient temperature temper bead welding technique for RV nozzles was developed to make the heat treatments unnecessary. This paper describes countermeasures against PWSCC and introduces the maintenance activities performed in Japan. (author)

  10. Digital maintenance field technology for the maintenance of nuclear power plant

    International Nuclear Information System (INIS)

    Sato, Tomomasa; Asama, Hajime; Kita, Nobuyuki; Numano, Masayoshi

    2002-01-01

    This paper proposes a concept of 'Digital Maintenance Field Technology', which enables human beings and working robots making fully use of the necessary information for maintenance activity not only in any location of the maintenance field (seamless in location) but also in any moment from the past to the future (seamless in time) and in any format in presenting to human (seamless in semantics). The paper points out the following three essential components of the technology: 1) 'Digital Field Construction Technology', 2) 'Digital Field Archival Technology' and 3) 'Digital Field Presentation Technology'. The necessary capabilities are extracted and our approaches and state of the art of realizing these capabilities are introduced in addition to present the state of the art of home application example. The future extension is also illustrated. (author)

  11. Deep brain stimulation of the subthalamic nucleus alters frontal activity during spatial working memory maintenance of patients with Parkinson's disease.

    Science.gov (United States)

    Mayer, Jutta S; Neimat, Joseph; Folley, Bradley S; Bourne, Sarah K; Konrad, Peter E; Charles, David; Park, Sohee

    2016-08-01

    Deep brain stimulation (DBS) of the subthalamic nucleus (STN) improves the motor symptoms of Parkinson's disease (PD). The STN may represent an important relay station not only in the motor but also the associative cortico-striato-thalamocortical pathway. Therefore, STN stimulation may alter cognitive functions, such as working memory (WM). We examined cortical effects of STN-DBS on WM in early PD patients using functional near-infrared spectroscopy. The effects of dopaminergic medication on WM were also examined. Lateral frontal activity during WM maintenance was greater when patients were taking dopaminergic medication. STN-DBS led to a trend-level worsening of WM performance, accompanied by increased lateral frontal activity during WM maintenance. These findings suggest that STN-DBS in PD might lead to functional modifications of the basal ganglia-thalamocortical pathway during WM maintenance.

  12. Conversion of a mainframe simulation for maintenance performance to a PC environment

    International Nuclear Information System (INIS)

    Gertman, D.I.

    1991-01-01

    A computer-based simulation capable of generating human error probabilities (HEPs) for maintenance activities is presented. The HEPs are suitable for use in probabilistic risk assessments (PRAs) and are an important source of information for data management systems such as NUCLARR- the Nuclear Computerized Library for Assessing Reactor Reliability. (1) The basic computer model MAPPS--the maintenance personnel performance simulation has been developed and validated by the US NRC in order to improve maintenance practices and procedures at nuclear power plants. This model validated previously, has now been implemented and improved, in a PC environment, and renamed MicroMAPPS. The model is stochastically based, able to simulate the performance of 2 to 15 person crews for a variety of maintenance conditions. These conditions include aspects of crew actions as potentially influenced by the task, the environment, or characteristics of the personnel involved. The nature of the software code makes it particularly appropriate for determining changes in HEP rates due to fluctuations in important task, environment,. or personnel parameters. The presentation presents a brief review of the mainframe version of the code and presents a summarization of the enhancements which dramatically change the nature of the human computer interaction

  13. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    Haange, R.

    1999-01-01

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large-scale test stands, to demonstrate the principle feasibility of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities (EDA) phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  14. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  15. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  16. Nuclear power plant maintenance optimisation SENUF network activity

    Energy Technology Data Exchange (ETDEWEB)

    Ahlstrand, R.; Bieth, M.; Pla, P.; Rieg, C.; Trampus, P. [Inst. for Energy, EC DG Joint Research Centre, Petten (Netherlands)

    2004-07-01

    During providing scientific and technical support to TACIS and PHARE nuclear safety programs a large amount of knowledge related to Russian design reactor systems has accumulated and led to creation of a new Network concerning Nuclear Safety in Central and Eastern Europe called ''Safety of Eastern European type Nuclear Facilities'' (SENUF). SENUF contributes to bring together all stakeholders of TACIS and PHARE: beneficiaries, end users, Eastern und Western nuclear industries, and thus, to favour fruitful technical exchanges and feedback of experience. At present the main focus of SENUF is the nuclear power plant maintenance as substantial element of plant operational safety as well as life management. A Working Group has been established on plant maintenance. One of its major tasks in 2004 is to prepare a status report on advanced strategies to optimise maintenance. Optimisation projects have an interface with the plant's overall life management program. Today, almost all plants involved in SENUF network have an explicit policy to extend their service life, thus, component ageing management, modernization and refurbishment actions became much more important. A database is also under development, which intends to help sharing the available knowledge and specific equipment and tools. (orig.)

  17. Business process modeling of industrial maintenance at TRANSPETRO: integrating oil pipeline and marine terminals activities

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio), Rio de Janeiro, RJ (Brazil). Programa de Pos-Graduacao em Metrologia para Qualidade e Inovacao

    2009-07-01

    This paper describes the experience of TRANSPETRO in remodeling industrial maintenance activities focusing on: preparing for business process modeling (BPM); mapping and analyzing 'As-Is' process; designing 'To-Be' process; implementing remodeled process; improving process continuously. The conceptual model and results achieved will contribute to several areas within the company as: reliability engineering; human resources, including employees' selective processes, training and development, and certifications; standardization process encompassing standard and operational procedures adoption according to up-dating external normative references and legal requirements; health, safety and environment (HSE) performance improvement. These are some of potential benefits from BPM focusing on TRANSPETRO's industrial maintenance area in the search of operational excellence. (author)

  18. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  19. An fMRI study of neuronal activation in schizophrenia patients with and without previous cannabis use

    Directory of Open Access Journals (Sweden)

    Else-Marie eLøberg

    2012-10-01

    Full Text Available Previous studies have mostly shown positive effects of cannabis use on cognition in patients with schizophrenia, which could reflect lower neurocognitive vulnerability. There are however no studies comparing whether such cognitive differences have neuronal correlates. Thus, the aim of the present study was to compare whether patients with previous cannabis use differ in brain activation from patients who has never used cannabis. The patients groups were compared on the ability to up-regulate an effort mode network during a cognitive task and down-regulate activation in the same network during a task-absent condition. Task-present and task-absent brain activation was measured by functional magnetic resonance neuroimaging (fMRI. Twenty-six patients with a DSM-IV and ICD-10 diagnosis of schizophrenia were grouped into a previous cannabis user group and a no-cannabis group. An auditory dichotic listening task with instructions of attention focus on either the right or left ear stimulus was used to tap verbal processing, attention and cognitive control, calculated as an aggregate score. When comparing the two groups, there were remaining activations in the task-present condition for the cannabis group, not seen in the no-cannabis group, while there was remaining activation in the task-absent condition for the no-cannabis group, not seen in the cannabis group. Thus, the patients with previous cannabis use showed increased activation in an effort mode network and decreased activation in the default mode network as compared to the no-cannabis group. It is concluded that the present study show some differences in brain activation to a cognitively challenging task between previous cannabis and no-cannabis schizophrenia patients.

  20. Lean thinking for a maintenance process

    Directory of Open Access Journals (Sweden)

    Sherif Mostafa

    2015-01-01

    Full Text Available The maintenance process shares significant operating costs in an organisation. Lean thinking can be incorporated into maintenance activities through applying its principles and practices/tools. Lean maintenance (LM is a prerequisite for lean manufacturing systems. This research proposes a new structure for LM process based on a systematic literature review of a significant number of related articles that were published on LM. The process structure is designed based on the five lean principles to guide and support organisations to pursue maintenance excellence. This study establishes a scheme for LM tools that are structured into 2 level 4 bundles and 26 lean practices/tools and develops a House of Waste (HoW to demonstrate the association between maintenance wastes and the LM tools. With a successful accomplishment of the proposed scheme, the performance of a maintenance department can create more improvement opportunities over time to reach the maintenance excellence status.

  1. Using heuristic search for optimizing maintenance plans

    International Nuclear Information System (INIS)

    Mutanen, Teemu

    2012-01-01

    This work addresses the maintenance action selection process. Maintenance personnel need to evaluate maintenance actions and costs to keep the machines in working condition. Group of actions are evaluated together as maintenance plans. The maintenance plans as output provide information to the user about which actions to take if any and what future actions should be prepared for. The heuristic search method is implemented as part of general use toolbox for analysis of measurements from movable work machines. Impacts from machine's usage restrictions and maintenance activities are analysed. The results show that once put on a temporal perspective, the prioritized order of the actions is different and provide additional information to the user.

  2. Good practices for cost effective maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1997-02-01

    This publication is organized around five areas that were identified by the utilities and government organizations who contributed to this report as most important to them. They are: Increasing production through maintenance activities related to improved plant material condition, reduced duration of planned outages, use of on-line maintenance and reduced frequency of forced outages; reducing workload through avoiding unnecessary regulatory burden and using reliability centered maintenance and condition monitoring; improving maintenance processes through better planning and scheduling, use of information management systems, graduated work controls, and appropriate post-maintenance testing; improving productivity through better teamwork, greater sharing of resources, and better radiation management associated with maintenance; measuring performance of maintenance activities through such tools as performance measures and benchmarking. Figs, tabs

  3. Differential effects of cognitive load on emotion: Emotion maintenance versus passive experience.

    Science.gov (United States)

    DeFraine, William C

    2016-06-01

    Two separate lines of research have examined the effects of cognitive load on emotional processing with similar tasks but seemingly contradictory results. Some research has shown that the emotions elicited by passive viewing of emotional images are reduced by subsequent cognitive load. Other research has shown that such emotions are not reduced by cognitive load if the emotions are actively maintained. The present study sought to compare and resolve these 2 lines of research. Participants either passively viewed negative emotional images or maintained the emotions elicited by the images, and after a delay rated the intensity of the emotion they were feeling. Half of trials included a math task during the delay to induce cognitive load, and the other half did not. Results showed that cognitive load reduced the intensity of negative emotions during passive-viewing of emotional images but not during emotion maintenance. The present study replicates the findings of both lines of research, and shows that the key factor is whether or not emotions are actively maintained. Also, in the context of previous emotion maintenance research, the present results support the theoretical idea of a separable emotion maintenance process. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  4. PMS2 endonuclease activity has distinct biological functions and is essential for genome maintenance.

    Science.gov (United States)

    van Oers, Johanna M M; Roa, Sergio; Werling, Uwe; Liu, Yiyong; Genschel, Jochen; Hou, Harry; Sellers, Rani S; Modrich, Paul; Scharff, Matthew D; Edelmann, Winfried

    2010-07-27

    The DNA mismatch repair protein PMS2 was recently found to encode a novel endonuclease activity. To determine the biological functions of this activity in mammals, we generated endonuclease-deficient Pms2E702K knock-in mice. Pms2EK/EK mice displayed increased genomic mutation rates and a strong cancer predisposition. In addition, class switch recombination, but not somatic hypermutation, was impaired in Pms2EK/EK B cells, indicating a specific role in Ig diversity. In contrast to Pms2-/- mice, Pms2EK/EK male mice were fertile, indicating that this activity is dispensable in spermatogenesis. Therefore, the PMS2 endonuclease activity has distinct biological functions and is essential for genome maintenance and tumor suppression.

  5. Few Considerations on the Maintenance Obligation in the Romanian Civil Law

    Directory of Open Access Journals (Sweden)

    Mirela Costache

    2017-08-01

    Full Text Available Objectives: Recently entered into force, the Romanian Civil Code, systematized on the stable and steady values of the former civil law, reforms the matter of the maintenance obligation, regardless of the source and the legal nature of this obligation. Prior Work: This is the reason why we have chosen this topic and the analysis of the typology to which such an obligation adapts and, of course, the correlative right to which it gives birth. Approach: In our current system of law there are provided different forms of exercising this obligation, preserving, improving, but also innovating, in some aspects, the previous regulation. Specifically, we will relate in this study to a brief analysis of all types of maintenance obligations, generated by two distinct sources: the law and the will of the parties (contract, in this case we are speaking of an obligation based on the law or a contractual obligation. The angle from which we are analyzing this type of obligational relationship between the maintenance creditor and the maintenance debtor also allows us to recall both the passive or active patrimonial side, and also the analysis of the legal characters that it presupposes each of the two above-mentioned generic types of maintenance obligations. Value: Starting from the conceptualization of the maintenance obligation, the present study will be oriented towards the analysis in the current legal context of the doctrinal points of view expressed in the specialized literature, using as a method the documentary research, the interpretative method and the comparative method.

  6. Which Socio-Ecological Factors Associate with a Switch to or Maintenance of Active and Passive Transport during the Transition from Primary to Secondary School?

    Science.gov (United States)

    Vanwolleghem, Griet; Van Dyck, Delfien; De Meester, Femke; De Bourdeaudhuij, Ilse; Cardon, Greet; Gheysen, Freja

    2016-01-01

    The aim was to investigate which individual, psychosocial and physical neighborhood environmental factors associate with children's switch to or maintenance of active/passive transport to school and to leisure time destinations during the transition from primary to secondary school. Children (n = 313) filled out a questionnaire in the last year of primary school and 2 years later to assess socio-demographic characteristics and self-reported transport. One of their parents completed a questionnaire to assess parental perceptions of psychosocial and physical neighborhood environmental factors. The increase of the home-school distance was significantly associated with children's switch to or maintenance of passive transport to school compared to a switch to (OR = 0.81; p = 0.03) and maintenance (OR = 0.87; p = 0.03) of active transport to school. Low SES was associated with children's switch to active transport to school compared to maintenance of active transport (OR = 3.67; p = 0.07). For transport to leisure time destinations, other factors such as parental perceived neighborhood safety from traffic and crime (OR = 2.78; p = 0.004), a positive social norm (OR = 1.49; p = 0.08), positive attitudes (OR = 1.39; p = 0.08) (i.e. more benefits, less barriers) towards their children's physical activity and poor walking/cycling facilities in the neighborhood (OR = 0.70; p = 0.06) were associated with children's maintenance of active transport to leisure time destinations compared to a switch to or maintenance of passive transport. This longitudinal study can give directions for interventions promoting children's active transport during the transition to secondary school. It is necessary to promote different possibilities at primary school for children to use active transport when going to secondary school. Walking/cycling a part of the home-school trip can be a possible solution for children who will be living at non-feasible distances from secondary school. Providing safe

  7. Pre-conceptual design assessment of DEMO remote maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Loving, A., E-mail: antony.loving@ccfe.ac.uk [EURATOM/Culham Center Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Crofts, O.; Sykes, N.; Iglesias, D.; Coleman, M.; Thomas, J. [EURATOM/Culham Center Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Harman, J. [EFDA Close Support Unit Garching, Boltzmannstaße 2, D-85748 Garching Bei München (Germany); Fischer, U. [Karlsruhe Institute of Technology, Institute for Neutron Physics and Reactor Technology, Hermann-von-Helmholtz-Platz 1, D-76344 Eggenstein-Leopoldshafen (Germany); Sanz, J. [Instituto de Fusión Nuclear/UPM, Madrid (Spain); Siuko, M. [VTT Technical Research Centre of Finland, P.O. Box 1000, FI-02044 VTT (Finland); Mittwollen, M. [Karlsruhe Institute of Technology, Institut für Fördertechnik und Logistiksysteme, Gotthard-Franz-Straße 8, Geb.50.38, 76131 Karlsruhe (Germany)

    2014-10-15

    EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/2013, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally valuable in communicating the complexity and scale of the required operations. Through these simulations, estimates of the maintenance task durations have been possible demonstrating that a full replacement of the blankets within 6 months could be achieved. The design of the first wall, including the need to use sacrificial limiters must still be investigated. In support of the maintenance operations, a first indication of the requirements of an Active Maintenance Facility (AMF) has been elaborated.

  8. Pavement maintenance scheduling using genetic algorithms

    OpenAIRE

    Yang, Chao; Remenyte-Prescott, Rasa; Andrews, John D.

    2015-01-01

    This paper presents a new pavement management system (PMS) to achieve the optimal pavement maintenance and rehabilitation (M&R) strategy for a highway network using genetic algorithms (GAs). Optimal M&R strategy is a set of pavement activities that both minimise the maintenance cost of a highway network and maximise the pavement condition of the road sections on the network during a certain planning period. NSGA-II, a multi-objective GA, is employed to perform pavement maintenance optimisatio...

  9. Operation and maintenance results from ISFOC CPV plants

    Science.gov (United States)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  10. Exploring end user adoption and maintenance of a telephone-based physical activity counseling service for individuals with physical disabilities using the Theoretical Domains Framework.

    Science.gov (United States)

    Tomasone, Jennifer R; Arbour-Nicitopoulos, Kelly P; Pila, Eva; Lamontagne, Marie-Eve; Cummings, Isabelle; Latimer-Cheung, Amy E; Routhier, François

    2017-06-01

    In Canada, two counseling services are offered to facilitate physical activity participation among persons with physical disabilities, yet both have encountered concerns related to the recruitment and retainment of clients. The purpose of this paper is to explore factors related to service adoption among nonusers, and the barriers and facilitators to maintaining service participation among adopters. Individuals who had never enrolled in the services (nonusers, n = 13) as well as current/previous service clients (adopters, n = 26) participated in interviews based on the Theoretical Domains Framework. Transcripts were subjected to deductive thematic analysis according to participant group. Fifteen themes relating to service adoption within 10 of the 12 theoretical domains were identified for nonusers, while 23 themes relating to maintenence of service participation were identified across all 12 theoretical domains for adopters. The findings provide strategies to improve recruitment, adoption, and retention of clients in counseling services and to enhance the experiences of targeted service users. Implications for Rehabiliation Peer support and education for equipment use should be built into physical activity programs to encourage participation among persons with physical disabilities. Programs that encourage physical activity among individuals with disabilities should be designed by practitioners to be responsive to a variety of needs, which are addressed in the program's advertisements and offerings. The Theoretical Domains Framework is a useful framework for providing valuable insight about clients' experiences of adoption and maintenance of a behavior change service, suggesting merit in other rehabilitation settings.

  11. Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling - abstract

    Science.gov (United States)

    As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...

  12. Maintenance and Safety Practices of Escalator in Commercial Buildings

    Science.gov (United States)

    Afida Isnaini Janipha, Nurul; Nur Aina Syed Alwee, Sharifah; Ariff, Raihan Mohd; Ismail, Faridah

    2018-02-01

    The escalator is very crucial to transport a person from one place to another. Nevertheless, there are many cases recorded the accidents in relation to escalator. These may occur due to lack of maintenance which leads to systems breakdown, poor safety practices, wear and tear, users’ negligence and others. Thus, proper maintenance systems need to be improvised to prevent and reduce escalator accident in future. This research was aimed to determine the escalator maintenance activities and safety practices in a commercial building. Three case studies were selected within Selangor area. Semi-structured interviews were conducted for collecting data from these three case studies. To achieve the aim of this research, the study was carried out on the maintenance activities, safety practices and cost related to escalator maintenance. As one of the important means of access in building, it is very crucial to increase effectiveness of escalator particularly in commercial building. It is expected that readers will get clear information on the maintenance activities and safety practices of escalator in commercial building.

  13. Cytosolic calcium ions exert a major influence on the firing rate and maintenance of pacemaker activity in guinea-pig sinus node.

    Directory of Open Access Journals (Sweden)

    Rebecca Anne Capel

    2015-02-01

    Full Text Available The sino-atrial node (SAN provides the electrical stimulus to initiate every heart beat. Cellular processes underlying this activity have been debated extensively, especially with regards to the role of intracellular calcium. We have used whole-cell application of 1,2-bis(o-aminophenoxyethane-N,N,N',N'-tetraacetic acid (BAPTA, a rapid calcium chelator, to guinea pig isolated SAN myocytes to assess the effect of rapid reduction of intracellular calcium on SAN cell electrical activity. High-dose (10 mM BAPTA induced rapid and complete cessation of rhythmic action potential (AP firing (time to cessation 5.5±1.7 s. Over a range of concentrations, BAPTA induced slowing of action potential firing and disruption of rhythmic activity, which was dose-dependent in its time of onset. Exposure to BAPTA was associated with stereotyped action potential changes similar to those previously reported in the presence of ryanodine, namely depolarisation of the most negative diastolic potential, prolongation of action potentials and a reduction in action potential amplitude. These experiments are consistent with the view that cytosolic calcium is essential to the maintenance of rhythmic pacemaker activity.

  14. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  15. Dynamic contracting mechanism for pavement maintenance management

    NARCIS (Netherlands)

    Demirel, H.C.; De Ridder, H.A.J.

    2013-01-01

    Technological advances, financial possibilities and changes of demands have increasingly affected the pavement maintenance environment for outsourcing in recent years. This induces complexity in the contracting methods of pavement maintenance activities. Despite the fact that current contracting

  16. A Field Study of Scale Economies in Software Maintenance

    OpenAIRE

    Rajiv D. Banker; Sandra A. Slaughter

    1997-01-01

    Software maintenance is a major concern for organizations. Productivity gains in software maintenance can enable redeployment of Information Systems resources to other activities. Thus, it is important to understand how software maintenance productivity can be improved. In this study, we investigate the relationship between project size and software maintenance productivity. We explore scale economies in software maintenance by examining a number of software enhancement projects at a large fi...

  17. Neutron induced activation in the EVEDA accelerator materials: Implications for the accelerator maintenance

    International Nuclear Information System (INIS)

    Sanz, J.; Garcia, M.; Sauvan, P.; Lopez, D.; Moreno, C.; Ibarra, A.; Sedano, L.

    2009-01-01

    The Engineering Validation and Engineering Design Activities (EVEDA) phase of the International Fusion Materials Irradiation Facility project should result in an accelerator prototype for which the analysis of the dose rates evolution during the beam-off phase is a necessary task for radioprotection and maintenance feasibility purposes. Important aspects of the computational methodology to address this problem are discussed, and dose rates for workers inside the accelerator vault are assessed and found to be not negligible.

  18. Neutron induced activation in the EVEDA accelerator materials: Implications for the accelerator maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sanz, J. [Department of Power Engineering, Universidad Nacional de Educacion a Distancia (UNED), C/Juan del Rosal 12, 28040 Madrid (Spain); Institute of Nuclear Fusion, UPM, 28006 Madrid (Spain)], E-mail: jsanz@ind.uned.es; Garcia, M.; Sauvan, P.; Lopez, D. [Department of Power Engineering, Universidad Nacional de Educacion a Distancia (UNED), C/Juan del Rosal 12, 28040 Madrid (Spain); Institute of Nuclear Fusion, UPM, 28006 Madrid (Spain); Moreno, C.; Ibarra, A.; Sedano, L. [CIEMAT, 28040 Madrid (Spain)

    2009-04-30

    The Engineering Validation and Engineering Design Activities (EVEDA) phase of the International Fusion Materials Irradiation Facility project should result in an accelerator prototype for which the analysis of the dose rates evolution during the beam-off phase is a necessary task for radioprotection and maintenance feasibility purposes. Important aspects of the computational methodology to address this problem are discussed, and dose rates for workers inside the accelerator vault are assessed and found to be not negligible.

  19. Recent Changes to ABR Maintenance of Certification Part 4 (PQI): Acknowledgment of Radiologists' Activities to Improve Quality and Safety.

    Science.gov (United States)

    Donnelly, Lane F; Mathews, Vincent P; Laszakovits, David J; Jackson, Valerie P; Guiberteau, Milton J

    2016-02-01

    The ABR has recently reviewed and revised its policy establishing how ABR diplomates may comply with requirements for Maintenance of Certification Part 4: Practice Quality Improvement (PQI). The changes were deemed necessary by the Board of Trustees to acknowledge and credit the numerous ways in which radiology professionals contribute to improving patient care through existing and evolving activities available to them within the radiology community. In addition to meeting requirements by completing a traditional PQI project, the policy revision now allows diplomates to meet criteria by completing one of a number of activities in an expanded spectrum of PQI options recognized by the ABR. The new policy also acknowledges the maturing state of quality improvement science by permitting PQI projects to use "any standard quality improvement methodology," such as Six Sigma, Lean, the Institute for Healthcare Improvement's Model for Improvement, and others in addition to the previously prescribed three-phase plan-do-study-act format. Copyright © 2016 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  20. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  1. Decreasing inventory of a cement factory roller mill parts using reliability centered maintenance method

    Science.gov (United States)

    Witantyo; Rindiyah, Anita

    2018-03-01

    According to data from maintenance planning and control, it was obtained that highest inventory value is non-routine components. Maintenance components are components which procured based on maintenance activities. The problem happens because there is no synchronization between maintenance activities and the components required. Reliability Centered Maintenance method is used to overcome the problem by reevaluating maintenance activities required components. The case chosen is roller mill system because it has the highest unscheduled downtime record. Components required for each maintenance activities will be determined by its failure distribution, so the number of components needed could be predicted. Moreover, those components will be reclassified from routine component to be non-routine component, so the procurement could be carried out regularly. Based on the conducted analysis, failure happens in almost every maintenance task are classified to become scheduled on condition task, scheduled discard task, schedule restoration task and no schedule maintenance. From 87 used components for maintenance activities are evaluated and there 19 components that experience reclassification from non-routine components to routine components. Then the reliability and need of those components were calculated for one-year operation period. Based on this invention, it is suggested to change all of the components in overhaul activity to increase the reliability of roller mill system. Besides, the inventory system should follow maintenance schedule and the number of required components in maintenance activity so the value of procurement will be decreased and the reliability system will increase.

  2. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  3. TPX remote maintenance and shielding

    International Nuclear Information System (INIS)

    Rennich, M.J.; Nelson, B.E.

    1994-01-01

    The Tokamak Physics Experiment machine design incorporates comprehensive planning for efficient and safe component maintenance. Three programmatic decisions have been made to insure the successful implementation of this objective. First, the tokamak incorporates radiation shielding to reduce activation of components and limit the dose rate to personnel working on the outside of the machine. This allows most of the ex-vessel equipment to be maintained through conventional ''hands-on'' procedures. Second, to the maximum extent possible, low activation materials will be used inside the shielding volume. This resulted in the selection of Titanium (Ti-6Al-4V) for the vacuum vessel and PFC structures. The third decision stipulated that the primary in-vessel components will be replaced or repaired via remote maintenance tools specifically provided for the task. The component designers have been given the responsibility of incorporating maintenance design and for proving the maintainability of the design concepts in full-scale mockup tests prior to the initiation of final fabrication. Remote maintenance of the TPX machine is facilitated by general purpose tools provided by a special purpose design team. Major tools will include an in-vessel transporter, a vessel transfer system and a large component transfer container. In addition, tools such as manipulators and remotely operable impact wrenches will be made available to the component designers by this group. Maintenance systems will also provide the necessary controls for this equipment

  4. Determination of Pareto frontier in multi-objective maintenance optimization

    International Nuclear Information System (INIS)

    Certa, Antonella; Galante, Giacomo; Lupo, Toni; Passannanti, Gianfranco

    2011-01-01

    The objective of a maintenance policy generally is the global maintenance cost minimization that involves not only the direct costs for both the maintenance actions and the spare parts, but also those ones due to the system stop for preventive maintenance and the downtime for failure. For some operating systems, the failure event can be dangerous so that they are asked to operate assuring a very high reliability level between two consecutive fixed stops. The present paper attempts to individuate the set of elements on which performing maintenance actions so that the system can assure the required reliability level until the next fixed stop for maintenance, minimizing both the global maintenance cost and the total maintenance time. In order to solve the previous constrained multi-objective optimization problem, an effective approach is proposed to obtain the best solutions (that is the Pareto optimal frontier) among which the decision maker will choose the more suitable one. As well known, describing the whole Pareto optimal frontier generally is a troublesome task. The paper proposes an algorithm able to rapidly overcome this problem and its effectiveness is shown by an application to a case study regarding a complex series-parallel system.

  5. Introducing artificial depth cues to improve task performance in ITER maintenance actions

    NARCIS (Netherlands)

    Heemskerk, C.J.M.; Eendebak, P.T.; Schropp, G.Y.R.; Hermes, H.V.; Elzendoorn, B.S.Q.; Magielsen, A.J.

    2013-01-01

    Maintenance operations on ITER tokamak components will be largely performed by remote handling. In previous work it was shown that representative maintenance tasks could be performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators

  6. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  7. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  8. Nuclear instrument maintenance and technical training in Nuclear Energy Unit

    International Nuclear Information System (INIS)

    Mohamad Nasir Abdul Wahid

    1987-01-01

    Instrument maintenance service is a necessity in a Nuclear Research Institute, such as the Nuclear Energy Unit (NEU) to ensure the smooth running of our research activities. However, realising that maintenance back-up service for either nuclear or other scientific equipment is a major problem in developing countries such as Malaysia, NEU has set up an Instrumentation and Control Department to assist in rectifying the maintenance problem. Beside supporting in house activities in NEU, the Instrumentation and Control Department (I and C) is also geared into providing services to other organisations in Malaysia. This paper will briefly outline the activities of NEU in nuclear instrument maintenance as well as in technical training. (author)

  9. The Modern Approach to Industrial Maintenance Management

    Directory of Open Access Journals (Sweden)

    Vasile DEAC

    2010-01-01

    Full Text Available The maintenance activity isn’t a purpose in itself, it’s a necessity of which "the production suffers" and the financial agent “considers too expensive”. It often exists a conflict between the production units and the maintenance department, not only for a short term, but, sometimes, for a long term, imposing a rigorous definition of each person’s responsibilities. Considering the mutations in the industrial equipments’ technical complexity and the accidental failures’ catastrophic consequences from the economic and/or social point of view, it should be assigned a new dimension to the maintenance activity. One of the imperatives imposed to this action is represented by modern means of informing through the maintenance’s operational computerization.

  10. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  11. Remote maintenance concepts for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Davis, F.C.; Hager, E.R.

    1988-01-01

    Because deuterium-tritium fuel will be used in the Compact Ignition Tokamak (CIT), remote handling technology is needed to carry out some maintenance operations on the machine. In keeping with the compact, low-cost nature of CIT, remote maintenance is provided only for systems with the highest probability of failure. Remote operations include removing, repairing (if feasible), and replacing such components as thermal protection tiles on the first wall, radio-frequency (rf) heating modules, and diagnostic modules. For maintenance inside the vacuum vessel, major pieces of equipment under development include an articulated boom manipulator with servomanipulators, an inspection manipulator, and special tooling. For maintenance outside the cryostat, remote equipment includes a bridge-mounted manipulator system, equipment for decontamination and hot cell activities, and for handling and packaging solid radioactive waste. The conceptual design phase of the CIT project is nearing completion; research and development activities in support of the project include demonstrations of remote maintenance operations on full-size partial mock-ups. 9 figs

  12. Trend analysis in the nuclear maintenance industry

    International Nuclear Information System (INIS)

    Ruemeli, W.A.

    1986-01-01

    The maintenance of nuclear facilities is a demanding, ongoing activity which requires the same level of quality as new construction. Heretofore, many owners and contractors have relied on ''gut feel'' to determine whether maintenance quality was improving or not. However, trend analysis now is becoming a key factor in monitoring plant activities to ensure quality. Literature abounds with descriptions of computerized systems for collecting and sorting data. Even the Nuclear Regulatory Commission (NRC) has concurred, with its endorsement of trend analysis of construction indicators in NUREG 1055 (Ford Amendment Study). Stearns Catalytic has developed a unique system of tend analyses for nuclear plant activities. Aside from its intended purpose of determining the quality trends in maintenance activities, the program also supplies substantial quantitative data for control and management of the quality activities. Trend analysis is a time series analysis of a set of observations arranged in chronological order. The important aspect is the time basis, specifically the analysis of quality indicators over successive periods of time. Many program elements, including surveillances, nonconformances, inspections, and audits, are designed to look at quality indications

  13. Maintenance, a global approach

    International Nuclear Information System (INIS)

    Calmejane, P.

    2001-01-01

    Maintenance is an important economic activity, it can represent up to 40% of operating costs in some fabrication units. The opening of energy markets to competition has led main operators to center their activities on their basis business and to sub-contract subsidiary activities. Subcontracting with strong engagements from the sub-contractor about results, time allowed and costs is now currently applied in nuclear industry. (A.C.)

  14. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  15. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  16. Solving complex maintenance planning optimization problems using stochastic simulation and multi-criteria fuzzy decision making

    International Nuclear Information System (INIS)

    Tahvili, Sahar; Österberg, Jonas; Silvestrov, Sergei; Biteus, Jonas

    2014-01-01

    One of the most important factors in the operations of many cooperations today is to maximize profit and one important tool to that effect is the optimization of maintenance activities. Maintenance activities is at the largest level divided into two major areas, corrective maintenance (CM) and preventive maintenance (PM). When optimizing maintenance activities, by a maintenance plan or policy, we seek to find the best activities to perform at each point in time, be it PM or CM. We explore the use of stochastic simulation, genetic algorithms and other tools for solving complex maintenance planning optimization problems in terms of a suggested framework model based on discrete event simulation

  17. Solving complex maintenance planning optimization problems using stochastic simulation and multi-criteria fuzzy decision making

    Energy Technology Data Exchange (ETDEWEB)

    Tahvili, Sahar [Mälardalen University (Sweden); Österberg, Jonas; Silvestrov, Sergei [Division of Applied Mathematics, Mälardalen University (Sweden); Biteus, Jonas [Scania CV (Sweden)

    2014-12-10

    One of the most important factors in the operations of many cooperations today is to maximize profit and one important tool to that effect is the optimization of maintenance activities. Maintenance activities is at the largest level divided into two major areas, corrective maintenance (CM) and preventive maintenance (PM). When optimizing maintenance activities, by a maintenance plan or policy, we seek to find the best activities to perform at each point in time, be it PM or CM. We explore the use of stochastic simulation, genetic algorithms and other tools for solving complex maintenance planning optimization problems in terms of a suggested framework model based on discrete event simulation.

  18. Optimisation of distributed maintenance: Modelling and application to the multi-factory production

    Energy Technology Data Exchange (ETDEWEB)

    Simeu-Abazi, Zineb, E-mail: Zineb.Simeu-Abazi@g-scop.inpg.fr [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France); Ahmad, Alali Alhouaij [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France)

    2011-11-15

    This paper concerns the modelling and the cost evaluation of maintenance activities in a distributed context. In this work we study the particular case where the maintenance activities are executed by two workshops: a central maintenance workshop (CMW) and a mobile maintenance workshop (MMW). The CMW concerns the repairing process for the corrective maintenance and the MMW executes all preventive maintenance in several factories according to a defined scheduling. The aim is to take into account the resources (spare parts in the MMW) and maintenance actions for a given operating budget. A modular approach for modelling a multi-site structure is proposed to achieve the aim of improving the availability of facilities on production sites while minimising the cost of maintenance.

  19. Increasing the competitiveness of maintenance contract rates by using an alternative methodology for the calculation of average vehicle maintenance costs

    Directory of Open Access Journals (Sweden)

    Stephen Carstens

    2008-11-01

    Full Text Available Companies tend to outsource transport to fleet management companies to increase efficiencies if transport is a non-core activity. The provision of fleet management services on contract introduces a certain amount of financial risk to the fleet management company, specifically fixed rate maintenance contracts. The quoted rate needs to be sufficient and also competitive in the market. Currently the quoted maintenance rates are based on the maintenance specifications of the manufacturer and the risk management approach of the fleet management company. This is usually reflected in a contingency that is included in the quoted maintenance rate. An alternative methodology for calculating the average maintenance cost for a vehicle fleet is proposed based on the actual maintenance expenditures of the vehicles and accepted statistical techniques. The proposed methodology results in accurate estimates (and associated confidence limits of the true average maintenance cost and can beused as a basis for the maintenance quote.

  20. Early implementation of the Maintenance Rule

    International Nuclear Information System (INIS)

    Green, J.R.

    1995-01-01

    On July 10, 1991, the U.S. Nuclear Regulatory Commission (NRC) published the Maintenance Rule as Section 50.65 of 10 CFR 50. The purpose of the Maintenance Rule is to ensure that the effectiveness of maintenance activities is assessed on an ongoing basis in a manner that ensures key structures, systems, and components are capable of performing their intended function. Full implementation of the rule is required by July 10, 1996. On May 31, 1994, the NRC published Generic Letter 94-01, which allowed removal of technical specification accelerated testing and special reporting requirements for emergency diesel generators provided a program is implemented for monitoring and maintaining emergency diesel generator performance consistent with the provisions of the Maintenance Rule

  1. Safety of nuclear operation and maintenance

    International Nuclear Information System (INIS)

    Mori, M.; Nitta, T.; Sakai, K.

    1994-01-01

    The Kansai Electric Power Co. Inc.(Kansai EPC) aims to pursue a high quality and highly reliable operation in nuclear power generation in order to ensure safety by reducing the risk of accidents and win the confidence from the society and the public. It is emphasised that in order to realize this aim manufacturers and contractors cooperate with each other in performing high quality maintenance through plant lifetime maintenance system. TQC (Total Quality Control) activity enhances the motivation for each individual to have a quality-oriented mind and cultivate the safety culture. Under the lifetime employment practice, Kansai EPC and maintenance contractors can conduct systematic education and training, and the Maintenance Training Center helps to make it effective. 6 figs

  2. Generalized Maintenance Trainer Simulator: Development of Hardware and Software. Final Report.

    Science.gov (United States)

    Towne, Douglas M.; Munro, Allen

    A general purpose maintenance trainer, which has the potential to simulate a wide variety of electronic equipments without hardware changes or new computer programs, has been developed and field tested by the Navy. Based on a previous laboratory model, the Generalized Maintenance Trainer Simulator (GMTS) is a relatively low cost trainer that…

  3. Regulatory oversight of maintenance activities at nuclear power plants in France

    International Nuclear Information System (INIS)

    Bouton, J.P.; Lallement, J.

    1997-01-01

    In France the nuclear safety authority sets out the main safety objectives but the operator remains the first responsible for the NPP safety. During the operation, operators have to demonstrate that the safety level remains the same as defined in the design studies. Maintenance contributes to meet this objective. The French regulation insists on the quality of the safety related components maintenance, especially in the 1984 order. All gap between results and requirements have to be analyzed by operator who provide feedback measures to avoid similar failure to occur. This gap have to be mentioned to regulators. The use of probabilistic safety analysis (PSA) and reliability centered maintenance (RCM) methods is not well developed in France to optimize maintenance. For the French regulatory, the major difficulties in the use of PSA are: The impossibility to detect unanticipated failure mode; the validity of the input data; the validity of model use, based on ''engineering judgement''. For the specific case of passive components inspection, such as the vessel of the primary circuit, the French regulator has already indicated to the operator that the optimization of maintenance by use of PSA cannot be used, for the following reasons: The safety analysis does not take into account the failure of the vessel; unanticipated failure modes have already damaged part of the primary circuit; the use of defense in depth concept requires a systematic detection of any defect on the vessel. (author)

  4. Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem

    Science.gov (United States)

    Vahdani, Behnam; Jolai, Fariborz; Tavakkoli-Moghaddam, Reza; Meysam Mousavi, S.

    2012-07-01

    Maintenance outsourcing can be regarded as a strategic weapon to increase productivity and customer satisfaction in many companies, and this critical activity can be performed in a more efficient and effective way. This article presents two novel fuzzy possibilistic bi-objective zero-one programming (FPBOZOP) models for outsourcing of the equipment maintenance. In these models, cost parameters, including outsourcing cost, risk cost, time operations for performing the equipment maintenance and reliability level, as well as other influential parameters are considered through the outsourcing process. Moreover, the presented models can measure the capability of the company in doing different activities, unlike previous studies, in order to see the possibility of maintenance in-house, and can lead to make a best decision on the basis of the models' results. Both models are developed under uncertainty, which bring top managers the possibility of assigning more than one equipment or project to the supplier so that the profit is maximized, and the cost is minimized by considering bi-objectives concurrently. Then, a new fuzzy mathematical programming based possibilistic approach is introduced as a solution methodology from the recent literature to solve the proposed bi-objective zero-one programming (BOZOP) models and to reach a preferred compromise solution. Furthermore, a real-case study is utilized to demonstrate and to validate the effectiveness of the presented models. The computational results revealed that the models can be implemented in variety of problems in the domain of the equipment maintenance outsourcing and project outsourcing either from theory or application perspectives.

  5. Proficiency evaluation of maintenance personnel: Training equivalency determination

    International Nuclear Information System (INIS)

    Price, W.J.

    1991-01-01

    The nuclear industry has recognized the importance of safe, quality, productive maintenance practices and has taken a number of initiatives that have generally improved maintenance programs. Because proficient maintenance practices are critical to plant safety and reliability, most plants have also recognized the need for reliable, valid testing techniques that demonstrate and assure the competence of their maintenance personnel. Until now, resource demands were too great to develop in-plant testing programs. In the past, maintenance supervisors have exempted personnel from training, using informal judgment of the employees' previous training and experience and informal observation of the employee on the job. While this procedure may have some degree of validity, it fails to provide the documentation for training equivalency that is required to satisfy the US Nuclear Regulatory Commission (NRC) regulations and Institute of Nuclear Power Operations (INPO) guidelines. To assess and demonstrate the proficiency levels of personnel, Calvert Cliffs needed to establish an objective, reliable, time-saving, and valid system to evaluate the competency levels of personnel. This was done in a joint effort with the Electric Power Research Institute

  6. A framework for the design of a voice-activated, intelligent, and hypermedia-based aircraft maintenance manual

    Science.gov (United States)

    Patankar, Manoj Shashikant

    Federal Aviation Regulations require Aviation Maintenance Technicians (AMTs) to refer to approved maintenance manuals when performing maintenance on airworthy aircraft. Because these manuals are paper-based, larger the size of the aircraft, more cumbersome are the manuals. Federal Aviation Administration (FAA) recognized the difficulties associated with the use of large manuals and conducted studies on the use of electronic media as an alternative to the traditional paper format. However, these techniques do not employ any artificial intelligence technologies and the user interface is limited to either a keyboard or a stylus pen. The primary emphasis of this research was to design a generic framework that would allow future development of voice-activated, intelligent, and hypermedia-based aircraft maintenance manuals. A prototype (VIHAMS-Voice-activated, Intelligent, and Hypermedia-based Aircraft Maintenance System) was developed, as a secondary emphasis, using the design and development techniques that evolved from this research. An evolutionary software design approach was used to design the proposed framework and the structured rapid prototyping technique was used to produce the VIHAMS prototype. VoiceAssist by Creative Labs was used to provide the voice interface so that the users (AMTs) could keep their hands free to work on the aircraft while maintaining complete control over the computer through discrete voice commands. KnowledgePro for Windows sp{TM}, an expert system shell, provided "intelligence" to the prototype. As a result of this intelligence, the system provided expert guidance to the user. The core information contained in conventional manuals was available in a hypermedia format. The prototype's operating hardware included a notebook computer with a fully functional audio system. An external microphone and the built-in speaker served as the input and output devices (along with the color monitor), respectively. Federal Aviation Administration

  7. Integrated services and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    Roos, Georg

    2001-01-01

    The general situation concerning services and nuclear power maintenance is reviewed following liberalization of Europa's power market. Issues relating to outsourcing maintenance services, effectiveness and reducing cost structure of maintenance are addressed on the cases of power markets in northern countries, Spain, Switzerland, Germany and Hungary. A special attention is paid on range of maintenance activity offered and performanced by Framatome. Ways of reducing costs in the field of maintenance as well as of reducing outage time are indicated. In conclusion, the following items are emphasized: - liberalization of Europe's power market in eastern Europe at its beginning; - in-house service in eastern Europe with numerous personnel; - Framatome ANP covers the entire range of maintenance competence; - consultance can be the first approach for a common co-operation

  8. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    International Nuclear Information System (INIS)

    Heinemann, J.L.; Millard, G.E.

    1997-08-01

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP

  9. MYC activation is a hallmark of cancer initiation and maintenance.

    Science.gov (United States)

    Gabay, Meital; Li, Yulin; Felsher, Dean W

    2014-06-02

    The MYC proto-oncogene has been implicated in the pathogenesis of most types of human tumors. MYC activation alone in many normal cells is restrained from causing tumorigenesis through multiple genetic and epigenetically controlled checkpoint mechanisms, including proliferative arrest, apoptosis, and cellular senescence. When pathologically activated in a permissive epigenetic and/or genetic context, MYC bypasses these mechanisms, enforcing many of the "hallmark" features of cancer, including relentless tumor growth associated with DNA replication and transcription, cellular proliferation and growth, protein synthesis, and altered cellular metabolism. MYC mandates tumor cell fate, by inducing stemness and blocking cellular senescence and differentiation. Additionally, MYC orchestrates changes in the tumor microenvironment, including the activation of angiogenesis and suppression of the host immune response. Provocatively, brief or even partial suppression of MYC back to its physiological levels of activation can result in the restoration of intrinsic checkpoint mechanisms, resulting in acute and sustained tumor regression, associated with tumor cells undergoing proliferative arrest, differentiation, senescence, and apoptosis, as well as remodeling of the tumor microenvironment, recruitment of an immune response, and shutdown of angiogenesis. Hence, tumors appear to be "addicted" to MYC because of both tumor cell-intrinsic, cell-autonomous and host-dependent, immune cell-dependent mechanisms. Both the trajectory and persistence of many human cancers require sustained MYC activation. Multiscale mathematical modeling may be useful to predict when tumors will be addicted to MYC. MYC is a hallmark molecular feature of both the initiation and maintenance of tumorigenesis. Copyright © 2014 Cold Spring Harbor Laboratory Press; all rights reserved.

  10. Motivational indictors predicting the engagement, frequency and adequacy of rainwater tank maintenance

    Science.gov (United States)

    Mankad, Aditi; Greenhill, Murni

    2014-01-01

    Rainwater tank maintenance is a key social behavior in our changing environment, as tanks are being adopted worldwide to augment household water supplies and reduce urban water stress. The maintenance of rainwater tanks in urban areas is an important pro-environmental behavior that prevents public health issues arising from unhygienic tank use. This study examined motivational differences in maintenance behavior between householders with retrofitted and mandated (compulsory) rainwater tanks on their property (N = 1988). Results showed that retrofitted tank owners were more self-determined in their motivation than mandated owners. Amotivation and integrated regulation were both dominant predictors of engagement in tank maintenance, frequency and adequacy of tank maintenance activities. Those involved in more maintenance activity were likely driven to do so because of feelings of adherence to personal goals and values (e.g., as "sustainable" citizens), whereas individuals who experienced a lack of control and alienation from the activity were likely to view maintenance as meaningless. Thus, people with higher integrated regulation engaged in more tank maintenance activities, whereas more amotivated individuals engaged in less maintenance. As cities begin relying more on citizen self-sufficiency with respect to water and energy resources, issues relating to infrastructure maintenance and operation become paramount. Results show that motivation is important in the impetus to engage in a pro-environmental behavior as well as the frequency and accuracy with which that behavior is undertaken. Policy implications are further discussed.

  11. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  12. Operations and maintenance - Safety challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Liv [Oljedirektoratet, Stavanger (Norway)

    1999-07-01

    With the unsteady oil prices and the possible consequences of the deregulation of the European energy markets one may expect further optimization of operating and maintenance costs. One may also expect extended use of various risk-based optimization techniques such as RCM (Reliability Centered Maintenance) and RBI (Risk Based Inspection). This presentation addresses the need for further research and development in this area. Maintenance work is necessary, but it can also create risk. The accident statistics show many examples of this. The Norwegian petroleum industry's ability to learn from previous incidents is questioned. Maintenance staff must be well trained and possess the necessary routines. Technical documentation must be updated. Uncertainties with respect to future oil and gas prices combined with the effect of the deregulation of the European energy markets will lead to even more focus on cost-effective operations and maintenance. The need for long-term research and development is stressed. Risk based techniques such as RCM and RBI are extensively used in the defence industry and the nuclear industry, but applying them to the petroleum industry requires improved risk models. Ageing effects such as corrosion, erosion, fatigue etc. can be expected, but the capability to predict, monitor and control them should be improved. At present, not even the most sophisticated risk analysis can model ageing effects. The importance of efficient use of information technology (IT) is stressed. Improving the product quality and safety often requires new technology and so research and development is important. Close cooperation with the industry is required.

  13. RA reactor operation and maintenance in 1992, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktoro RA u 1992. Godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Tanaskovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-12-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems. [Serbo-Croat] U toku 1992 godine poslovi u okviru projekta 'Istrazivacki nuklearni reaktor RA' obavljani su u skladu sa programom i planom rada. Osnovne aktivnosti na kojima je radjeno odnosile su se na revitalizaciju reaktora RA, kao i na odrzavanje opreme. U ovom periodu reaktor nije bio u pogonu. Svo osoblje je bilo angazovano na poslovima rekonstrukcije i modernizacije postojecih i dogradnje novih reaktorskih sistema, na odrzavanju opreme a deo tehnickog osoblja je bio obucavan za vrsenje odgovarajucih poslova u pogonu i odrzavanju opreme.

  14. Implementation of the maintenance rule in Spain the PSA role

    International Nuclear Information System (INIS)

    Gerez, L.; Coello, A.

    2000-01-01

    The 10CFR50, 65 (Maintenance Rule) requires commercial nuclear power plant licensees to monitor the effectiveness of maintenance activities for safety important plant equipment in order to minimise the likelihood of failures and events caused by the lack of effective maintenance. (Author)

  15. Optimization of maintenance policy using the proportional hazard model

    Energy Technology Data Exchange (ETDEWEB)

    Samrout, M. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: mohamad.el_samrout@utt.fr; Chatelet, E. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: chatelt@utt.fr; Kouta, R. [M3M Laboratory, University of Technology of Belfort Montbeliard (France); Chebbo, N. [Industrial Systems Laboratory, IUT, Lebanese University (Lebanon)

    2009-01-15

    The evolution of system reliability depends on its structure as well as on the evolution of its components reliability. The latter is a function of component age during a system's operating life. Component aging is strongly affected by maintenance activities performed on the system. In this work, we consider two categories of maintenance activities: corrective maintenance (CM) and preventive maintenance (PM). Maintenance actions are characterized by their ability to reduce this age. PM consists of actions applied on components while they are operating, whereas CM actions occur when the component breaks down. In this paper, we expound a new method to integrate the effect of CM while planning for the PM policy. The proportional hazard function was used as a modeling tool for that purpose. Interesting results were obtained when comparison between policies that take into consideration the CM effect and those that do not is established.

  16. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  17. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  18. Optimum Maintenance Strategies for Highway Bridges

    DEFF Research Database (Denmark)

    Frangopol, Dan M.; Thoft-Christensen, Palle; Das, Parag C.

    As bridges become older and maintenance costs become higher, transportation agencies are facing challenges related to implementation of optimal bridge management programs based on life cycle cost considerations. A reliability-based approach is necessary to find optimal solutions based on minimum...... expected life-cycle costs or maximum life-cycle benefits. This is because many maintenance activities can be associated with significant costs, but their effects on bridge safety can be minor. In this paper, the program of an investigation on optimum maintenance strategies for different bridge types...... is described. The end result of this investigation will be a general reliability-based framework to be used by the UK Highways Agency in order to plan optimal strategies for the maintenance of its bridge network so as to optimize whole-life costs....

  19. Optimization of the preventive maintenance plan of a series components system

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Jose A. Caldeira [Mathematical Department, Instituto Politecnico de Setubal/Escola Superior de Tecnologia de Setubal, Campus do IPS, Estefanilha, 2914-508 Setubal (Portugal)]. E-mail: jduarte@est.ips.pt; Craveiro, Joao C. Taborda A. [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal); Trigo, Tomas Pedro [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal)

    2006-04-15

    One of the most critical problems in preventive maintenance is the determination of the optimum frequency to perform preventive maintenance in equipment, in order to ensure its availability. In this paper, we propose an algorithm to solve the previous problem for equipment that exhibit linearly increasing hazard rate and constant repair rate. Based on this algorithm, we have developed another one to solve the problem of maintenance management of a series system based on preventive maintenance over the different system components. We assume that all components of the system still exhibit linearly increasing hazard rate and constant repair rate and that preventive maintenance would bring the system to the as good as new condition. We define a cost function for maintenance tasks (preventive and corrective) for the system. The algorithm calculates the interval of time between preventive maintenance actions for each component, minimizing the costs, and in such a way that the total downtime, in a certain period of time, does not exceed a predetermined value.

  20. A quantitative comparison of corrective and perfective maintenance

    Science.gov (United States)

    Henry, Joel; Cain, James

    1994-01-01

    This paper presents a quantitative comparison of corrective and perfective software maintenance activities. The comparison utilizes basic data collected throughout the maintenance process. The data collected are extensive and allow the impact of both types of maintenance to be quantitatively evaluated and compared. Basic statistical techniques test relationships between and among process and product data. The results show interesting similarities and important differences in both process and product characteristics.

  1. PLC based control system and maintenance activities at NCAR, Bilaspur

    International Nuclear Information System (INIS)

    Dewangan, Jaidev; Trivedi, T.; Patel, Shiv P.; Malik, C.; Kumar, Rakesh; Gupta, Santosh Kumar; Bajpai, P.K.

    2015-01-01

    A 3.0 MV high current low energy Pelletron Accelerator facility (Model 9SDH-4, NEC, USA) with TORUIS (ion source for H + and He 2+ beam current H + ion ∼ 50μA @ 6 MeV, He 2+ at ∼ 10μA) and SNICS-II ion source for heavy ions has been commissioned as 'National Centre for Accelerator Based Research' in the Department of Pure and Applied Physics, Guru Ghasidas Vishwavidyalaya. In this paper, we detail out the control system developed and implemented at NCAR. The basic idea of controlling the machine is by providing the output signal through PLC to ACPC of accelerator using user interface points provided by the manufacturer. The PLC based system generates output signal once it receives the feedback signals from search and secure switches, door lock switches and scram switches interlocked with PLC. The output is controlled by ladder logic and is activated only when all the radiation monitors are in healthy state and outside radiations monitor having low radiation level. The details of control system and maintenance activities will be discussed in the paper

  2. Initial integration of accident safety, waste management, recycling, effluent, and maintenance considerations for low-activation materials

    International Nuclear Information System (INIS)

    Piet, S.J.; Herring, J.S.; Cheng, E.T.; Fetter, S.

    1991-01-01

    A true low-activation material should ideally achieve all of the following objectives: 1. The possible prompt dose at the site boundary from 100% release of the inventory should be <2 Sv (200 rem); hence, the design would be inherently safe in that no possible accident could result in prompt radiation fatalities. 2. The possible cancers from realistic releases should be limited such that the accident risk is <0.1%/yr of the existing background cancer risk to local residents. This includes consideration of elemental volatility. 3. The decay heat should be limited so that active mitigative measures are not needed to protect the investment from cooling transients; hence, the design would be passively safe with respect to decay heat. 4. Used materials could be either recycled or disposed of as near- surface waste. 5. Hands-on maintenance should be possible around coolant system piping and components such as the heat exchanger. 6. Effluent of activation products should be minor compared to the major challenge of limiting tritium effluents. The most recent studies in these areas are used to determine which individual elements and engineering materials are low activation. Grades from A (best) to G (worst) are given to each element in the areas of accident safety, recycling, and waste management. Structure/fluid combinations are examined for low-activation effluents and out-of-blanket maintenance. The lowest activation structural materials are silicon carbide, vanadium alloys, and ferritic steels. Impurities and minor alloying constituents must be carefully considered. The lowest activation coolants are helium, water, FLiBe, and lithium. The lowest activation breeders are lithium, lithium oxide, lithium silicate, and FLiBe. Designs focusing on these truly low-activation materials will help achieve the excellent safety and environmental potential of fusion energy

  3. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  4. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  5. Working memory maintenance is sufficient to reduce state anxiety.

    Science.gov (United States)

    Balderston, Nicholas L; Quispe-Escudero, David; Hale, Elizabeth; Davis, Andrew; O'Connell, Katherine; Ernst, Monique; Grillon, Christian

    2016-11-01

    According to the attentional control theory (ACT) proposed by Eysenck and colleagues, anxiety interferes with cognitive processing by prioritizing bottom-up attentional processes over top-down attentional processes, leading to competition for access to limited resources in working memory, particularly the central executive (Eysenck, Derakshan, Santos, & Calvo, ). However, previous research using the n-back working memory task suggests that working memory load also reduces state anxiety. Assuming that similar mechanisms underlie the effect of anxiety on cognition, and the effect of cognition on anxiety, one possible implication of the ACT would suggest that the reduction of state anxiety with increasing working memory load is driven by activation of central executive attentional control processes. We tested this hypothesis using the Sternberg working memory paradigm, where maintenance processes can be isolated from central executive processes (Altamura et al., ; Sternberg, ). Consistent with the n-back results, subjects showed decreased state anxiety during the maintenance period of high-load trials relative to low-load trials, suggesting that maintenance processes alone are sufficient to achieve this state anxiety reduction. Given that the Sternberg task does not require central executive engagement, these results are not consistent with an implication of the ACT where the cognition/anxiety relationship and anxiety/cognition relationship are mediated by similar central executive mechanisms. Instead, we propose an extension of the ACT such that engaging working memory maintenance suppresses state anxiety in a load-dependent manner. Furthermore, we hypothesize that the efficacy of this effect may moderate the effect of trait anxiety on cognition. Published 2016. This article is a U.S. Government work and is in the public domain in the USA.

  6. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Migaud, D.; Hutin, J.P.; Jouette, I.; Eymond, P.; Devie, P.; Cudelou, C.; Magnier, S.; Frydman, M.

    2016-01-01

    This document gathers different articles concerning the maintenance of the French nuclear power plants. The first article analyses the impact of the recent law on the energetic transition that sets the share of nuclear power at 50% of the electricity produced by 2025. A consequence may be the decommissioning of 17 to 20 reactors by 2025 and the huge maintenance program called 'Grand Carenage' whose aim is to extend operating life over 40 years will have to be re-considered in order to avoid useless expenses. The second article shows that in 2015 the French nuclear reactor fleet got very good results in terms of availability and safety. There were 49 scheduled outages and among them some ended ahead of time. The third article describes the specificities of the maintenance of a nuclear power plant, for instance the redundancy of some systems implies that maintenance has to deal with systems that have never functioned but must be ready to operate at any moment. Another specificity is the complexity of a nuclear power plant that implies an essential phase of preparation for maintenance operations. Because of safety requirements any maintenance operation has to be controlled, checked and may provide feedback. The fourth article presents the 'Grand Carenage' maintenance program that involves the following operations: the replacement of steam generators, the re-tubing of condensers, the replacement of the filtering drums used for cooling water, the testing of the reactor building, the hydraulic test of the primary circuit and the inspection of the reactor vessel. The fifth article focuses on the organization of the work-site for maintenance operations and the example of the Belleville-sur-Loire is described in the sixth article. Important maintenance operations like 'Grand Carenage' requires a strong collaboration with a network of specialized enterprises and as no reactor (except Flamanville EPR) is being built in France, maintenance

  7. Maintenance facilities, stores and records

    International Nuclear Information System (INIS)

    Fischer, K.

    1986-01-01

    The topics of this report are: on-site or off-site facilities. On-site facilities: workshops and special facilities. KWU's Service Center, a typical off-site supporting facility in Germany, capabilities and activities. A pool for special tools and equipment: devices for plugging of nozzles, for handling of RPU-studs and RPU internals etc. Devices for and management of radiological protection on-site for typical outage work. Spare parts and spare part management on site, typical examples. KWU's centralized spare part pools for components, generators and turbines etc. A computerized system for spare parts storage and maintenance planning. A system for mutual exchange of operational experience with respect to maintenance and repair activities. Systematic evaluation of failures and statistical results. (orig./GL)

  8. Mining Surveillance and Maintenance Dollars

    International Nuclear Information System (INIS)

    MARTINEZ, R.

    2000-01-01

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S and M) activities. However, ongoing S and M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations

  9. Dr. Mainte. Integrated simulator of maintenance optimization of LWRs

    International Nuclear Information System (INIS)

    Isobe, Yoshihiro; Sagisaka, Mitsuyuki; Etoh, Junji; Matsunaga, Takashi; Kosaka, Toru; Matsumoto, Satoshi; Yoshimura, Shinobu

    2014-01-01

    Dr. Mainte, an integrated simulator for maintenance optimization of LWRs (Light Water Reactors) has been developed based on PFM (Probabilistic Fracture Mechanics) analyses. The concept of the simulator is to provide a decision-making system to optimize maintenance activities for representative components and piping systems in nuclear power plants totally and quantitatively in terms of safety, availability and economic efficiency, environmental impact and social acceptance. For the further improvement of the safety and availability, the effect of human error and its reduction on the optimization of plant maintenance activities and approaches of reducing it have been studied. (author)

  10. Maintenance policy of the nuclear park

    International Nuclear Information System (INIS)

    Teisset, J.M.

    1995-01-01

    The nuclear installations maintenance policy of Electricite de France (EDF) follows three axes: first, controlling the aging of the production tool to warrant the safety and the functional reliability during the 40 years of installations service life. Second: optimizing the maintenance activities taking into account the safety goals, costs, security, dosimetry, duration of outages, and intervention conditions in the decisions. Third: developing a real partnership with contractors. EDF has decided to decentralize its maintenance operations towards each unit which is in charge of the organization of its own project. A better management of the contractor personnel has allowed to increase the performances of maintenance operations. The development of long-term agreements with contractors has permitted to reinforce the qualification, the responsibility and the efficiency of the personnel and to improve their means and tools. (J.S.). 1 photo

  11. 25 CFR 170.801 - What is the BIA Road Maintenance Program?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the BIA Road Maintenance Program? 170.801 Section... ROADS PROGRAM BIA Road Maintenance § 170.801 What is the BIA Road Maintenance Program? The BIA Road... subpart contains a list of activities that are eligible for funding under the BIA road maintenance program. ...

  12. Sound recordings of road maintenance equipment on the Lincoln National Forest, New Mexico

    Science.gov (United States)

    D. K. Delaney; T. G. Grubb

    2004-01-01

    The purpose of this pilot study was to record, characterize, and quantify road maintenance activity in Mexican spotted owl (Strix occidentalis lucida) habitat to gauge potential sound level exposure for owls during road maintenance activities. We measured sound levels from three different types of road maintenance equipment (rock crusherlloader,...

  13. Selective maintenance of multi-state systems with structural dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.

    2017-01-01

    This paper studies the selective maintenance problem for multi-state systems with structural dependence. Each component can be in one of multiple working levels and several maintenance actions are possible to a component in a maintenance break. The components structurally form multiple hierarchical levels and dependence groups. A directed graph is used to represent the precedence relations of components in the system. A selective maintenance optimization model is developed to maximize the system reliability in the next mission under time and cost constraints. A backward search algorithm is used to determine the assembly sequence for a selective maintenance scenario. The maintenance model helps maintenance managers in determining the best combination of maintenance activities to maximize the probability of successfully completing the next mission. Examples showing the use of the proposed method are presented. - Highlights: • A selective maintenance model for multi-state systems is proposed considering both economic and structural dependence. • Structural dependence is modeled as precedence relationship when disassembling components for maintenance. • Resources for disassembly and maintenance are evaluated using a backward search algorithm. • Maintenance strategies with and without structural dependence are analyzed. • Ignoring structural dependence may lead to over-estimation of system reliability.

  14. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  15. Loss of maintenance DNA methylation results in abnormal DNA origin firing during DNA replication

    Energy Technology Data Exchange (ETDEWEB)

    Haruta, Mayumi [Department of Cell Biology, Graduate School of Medical Sciences, Nagoya City University, 1 Kawasumi, Mizuho-cho, Mizuho-ku, Nagoya 467-8601 (Japan); Shimada, Midori, E-mail: midorism@med.nagoya-cu.ac.jp [Department of Cell Biology, Graduate School of Medical Sciences, Nagoya City University, 1 Kawasumi, Mizuho-cho, Mizuho-ku, Nagoya 467-8601 (Japan); Nishiyama, Atsuya; Johmura, Yoshikazu [Department of Cell Biology, Graduate School of Medical Sciences, Nagoya City University, 1 Kawasumi, Mizuho-cho, Mizuho-ku, Nagoya 467-8601 (Japan); Le Tallec, Benoît; Debatisse, Michelle [Institut Curie, Centre de Recherche, 26 rue d’Ulm, CNRS UMR 3244, 75248 ParisCedex 05 (France); Nakanishi, Makoto, E-mail: mkt-naka@med.nagoya-cu.ac.jp [Department of Cell Biology, Graduate School of Medical Sciences, Nagoya City University, 1 Kawasumi, Mizuho-cho, Mizuho-ku, Nagoya 467-8601 (Japan)

    2016-01-22

    The mammalian maintenance methyltransferase DNMT1 [DNA (cytosine-5-)-methyltransferase 1] mediates the inheritance of the DNA methylation pattern during replication. Previous studies have shown that depletion of DNMT1 causes a severe growth defect and apoptosis in differentiated cells. However, the detailed mechanisms behind this phenomenon remain poorly understood. Here we show that conditional ablation of Dnmt1 in murine embryonic fibroblasts (MEFs) resulted in an aberrant DNA replication program showing an accumulation of late-S phase replication and causing severely defective growth. Furthermore, we found that the catalytic activity and replication focus targeting sequence of DNMT1 are required for a proper DNA replication program. Taken together, our findings suggest that the maintenance of DNA methylation by DNMT1 plays a critical role in proper regulation of DNA replication in mammalian cells. - Highlights: • DNMT1 depletion results in an abnormal DNA replication program. • Aberrant DNA replication is independent of the DNA damage checkpoint in DNMT1cKO. • DNMT1 catalytic activity and RFT domain are required for proper DNA replication. • DNMT1 catalytic activity and RFT domain are required for cell proliferation.

  16. Loss of maintenance DNA methylation results in abnormal DNA origin firing during DNA replication

    International Nuclear Information System (INIS)

    Haruta, Mayumi; Shimada, Midori; Nishiyama, Atsuya; Johmura, Yoshikazu; Le Tallec, Benoît; Debatisse, Michelle; Nakanishi, Makoto

    2016-01-01

    The mammalian maintenance methyltransferase DNMT1 [DNA (cytosine-5-)-methyltransferase 1] mediates the inheritance of the DNA methylation pattern during replication. Previous studies have shown that depletion of DNMT1 causes a severe growth defect and apoptosis in differentiated cells. However, the detailed mechanisms behind this phenomenon remain poorly understood. Here we show that conditional ablation of Dnmt1 in murine embryonic fibroblasts (MEFs) resulted in an aberrant DNA replication program showing an accumulation of late-S phase replication and causing severely defective growth. Furthermore, we found that the catalytic activity and replication focus targeting sequence of DNMT1 are required for a proper DNA replication program. Taken together, our findings suggest that the maintenance of DNA methylation by DNMT1 plays a critical role in proper regulation of DNA replication in mammalian cells. - Highlights: • DNMT1 depletion results in an abnormal DNA replication program. • Aberrant DNA replication is independent of the DNA damage checkpoint in DNMT1cKO. • DNMT1 catalytic activity and RFT domain are required for proper DNA replication. • DNMT1 catalytic activity and RFT domain are required for cell proliferation.

  17. Leisure-time activity is an important determinant of long-term weight maintenance after weight loss in the Sibutramine Trial on Obesity Reduction and Maintenance (STORM trial)

    DEFF Research Database (Denmark)

    van Baak, M. A.; van Mil, E.; Astrup, A.

    2003-01-01

    The success rate of long-term maintenance of weight loss in obese patients is usually low. To improve the success rate, determinants of long-term weight maintenance must be identified.......The success rate of long-term maintenance of weight loss in obese patients is usually low. To improve the success rate, determinants of long-term weight maintenance must be identified....

  18. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  19. Modularity Design Approach for Preventive Machine Maintenance

    Science.gov (United States)

    Ernawati, D.; Pudji, E.; Ngatilah, Y.; Handoyo, R.

    2018-01-01

    In a company, machine maintenance system will be very influential in production process activity. The company should have a scheduled engine maintenance system that does not require high costs when repairing and replacing machine parts. Modularity Design method is able to provide solutions to the engine maintenance scheduling system and can prevent fatal damage to the engine components. It can minimize the cost of repair and replacement of these machine components.The paper provides a solution to machine maintenance problems. The paper is also completed with case study of milling machines. That case studies can give us a real description about impact implementation of modularity design to prevent fatal damage to components and minimize the cost of repair and replacement of components of the machine.

  20. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  1. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Malmqvist, Stefan; Leboeuf-Yde, Charlotte

    2009-01-01

    of maintenance care. Previous studies have identified chiropractors' choices of case management strategies in response to different case scenarios. However, the rationale for these management strategies is not known. In other words, when presented with both the case, and different management strategies......Maintenance care is a well known concept among chiropractors, although there is little knowledge about its exact definition, its indications and usefulness. As an initial step in a research program on this phenomenon, it was necessary to identify chiropractors' rationale for their use......, there was consensus on how to match these, but if only the management strategies were provided, would chiropractors be able to define the cases to fit these strategies? The objective with this study was to investigate if there is a common pattern in Finnish chiropractors' case management of patients with low back...

  2. The relationship between physical activity, volitional skills and weight loss maintenance in Danish obese individuals

    DEFF Research Database (Denmark)

    Elsborg, Peter; Pfister, Gertrud Ursula; Helge, Jørn Wulff

    . However, the relationship between weight loss maintenance and volitional skills has not been investigated yet. This study investigates if volitional skills are related to the amount of physical activity in obese individuals, and their relationship with actual successful weight loss. Methods: Participants...... to exercise. Results: Success was determined by the difference between an individual’s highest ever and current BMI. Analyses indicated that the successful weight maintainers’ possessed significantly higher values in the volitional skills initiative, general self-confidence, volitional self......-confidence and coping with failure and lower values in lack of energy, postponing training, and avoiding effort than unsuccessful weight maintainers. Furthermore, the successful were significantly more physically active. Higher physical activity was related to higher positive lower negative values in a total of 9...

  3. Operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ackermann, G.

    1987-01-01

    This textbook gives a systematic introduction into the operational and maintenance activities in nuclear power plants with pressurized water reactors. Subjects: (1) Setup and operational behaviour of power reactors, (2) setup of nuclear power plants, (3) radiation protection and nuclear safety, (4) nuclear fuel, (5) constructional layout of nuclear power plants, (6) management, and (7) maintenance. 158 figs., 56 tabs

  4. Exposure control during high maintenance jobs

    International Nuclear Information System (INIS)

    Hinson, C.S.; Wigginton, J.E.

    1991-01-01

    Occupational radiation doses at US light-water-cooled reactors (LWRs) have been decreasing every year since 1983. In 1989, the LWR average dose per reactor reached its lowest point since 1973. Historically, maintenance-related activities have accounted for between 70 and 75% of the total occupational doses at US LWRs, and most of this maintenance-related dose is accrued during plant outages. This paper will focus on high dose maintenance jobs such as steam generator replacement, recirculation pipe replacement/crack repair, induction heating stress improvement, and steam generator tube plugging/sleeving and will discuss how the doses associated with these jobs have declined over the past several years through the implementation of various ALARA techniques

  5. Stochastic maintenance optimization at Candu power plants

    International Nuclear Information System (INIS)

    Doyle, E.K.; Duchesne, T.; Lee, C.G.; Cho, D.I.

    2004-01-01

    The use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems as previously reported at ICONE 6 in New Orleans (1996). Further refinement of the station maintenance strategy was evaluated via the applicability of statistical analysis of historical failure data. The viability of stochastic methods in Candu maintenance was illustrated at ICONE 10 in Washington DC (2002). The next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principal impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. The current reality of global competition necessitates the pursuit of all financial optimizers. The next construction phase in the power generation industry will soon begin on a worldwide basis. With the relatively high initial capital cost of new nuclear generation all possible avenues of financial optimization must be evaluated and implemented. (authors)

  6. Development of advanced human-machine system for plant operation and maintenance

    International Nuclear Information System (INIS)

    Wu, Wei; Ohi, Tadashi; Yoshikawa, Hidekazu; Sawaragi, Tetsuo; Kitamura, Masaharu; Furuta, Kazuo; Gofuku, Akio; Ito, Koji

    2004-01-01

    With the worldwide deregulation of the power industry, and the aging of the nuclear power plants (NPPs), concerns are growing over the reliability and safety of the NPPs, because the regulation of man power may lower the current high level of reliability and safety. In this paper, a concept of overall integrated plant management mechanism is proposed, in order to meet the requirements of cutting costs of NPPs and the requirements of maintaining or increasing safety and reliability. The concept is called as satellite operation maintenance center (SOMC). SOMC integrates the operation and maintenance activities of several NPP units by utilizing advanced information technologies to support cooperation activities between workers allocated at SOMC and the field workers. As for the operation activities, a framework called as Advanced Operation System (AOS) is proposed in this paper. AOS consists of three support sub-systems: dynamic operation permission system(DyOPS), supervisor information presentation system using interface agent, and crew performance evaluation system. As for the maintenance activities, a framework called as Ubiquitous-Computing-based Maintenance support System (UCMS) is proposed next. Two case studies are described, in order to show the way of how UCMS support field workers to do maintenance tasks efficiently, safely, and infallibly as well. Finally, a prospect of SOMC is shown in order to explain the way of how the technology elements developed in this project could be integrated as a whole one system to support maintenance activities of NPPs in the future. (author)

  7. A new approach to physical activity maintenance: Rationale, design, and baseline data from the Keep Active Minnesota trial

    Directory of Open Access Journals (Sweden)

    Crain A Lauren

    2008-07-01

    Full Text Available Abstract Background Since many individuals who initiate physical activity programs are highly likely to return to a sedentary lifestyle, innovative strategies to efforts to increase the number of physically active older adults who successfully maintain beneficial levels of PA for a substantial length of time are needed. Methods/Design The Keep Active Minnesota Trial is a randomized controlled trial of an interactive phone- and mail-based intervention to help 50–70 year old adults who have recently increased their physical activity level, maintain that activity level over a 24-month period in comparison to usual care. Baseline, 6, 12, and 24 month measurement occurred via phone surveys with kilocalories expended per week in total and moderate-to-vigorous physical activity (CHAMPS Questionnaire as the primary outcome measures. Secondary outcomes include hypothesized mediators of physical activity change (e.g., physical activity enjoyment, self-efficacy, physical activity self-concept, body mass index, and depression. Seven day accelerometry data were collected on a sub-sample of participants at baseline and 24-month follow-up. Discussion The Keep Active Minnesota study offers an innovative approach to the perennial problem of physical activity relapse; by focusing explicitly on physical activity maintenance, the intervention holds considerable promise for modifying the typical relapse curve. Moreover, if shown to be efficacious, the use of phone- and mail-based intervention delivery offers potential for widespread dissemination. Trial registration ClinicalTrials.gov Identifier: NCT00283452.

  8. Loss of maintenance DNA methylation results in abnormal DNA origin firing during DNA replication.

    Science.gov (United States)

    Haruta, Mayumi; Shimada, Midori; Nishiyama, Atsuya; Johmura, Yoshikazu; Le Tallec, Benoît; Debatisse, Michelle; Nakanishi, Makoto

    2016-01-22

    The mammalian maintenance methyltransferase DNMT1 [DNA (cytosine-5-)-methyltransferase 1] mediates the inheritance of the DNA methylation pattern during replication. Previous studies have shown that depletion of DNMT1 causes a severe growth defect and apoptosis in differentiated cells. However, the detailed mechanisms behind this phenomenon remain poorly understood. Here we show that conditional ablation of Dnmt1 in murine embryonic fibroblasts (MEFs) resulted in an aberrant DNA replication program showing an accumulation of late-S phase replication and causing severely defective growth. Furthermore, we found that the catalytic activity and replication focus targeting sequence of DNMT1 are required for a proper DNA replication program. Taken together, our findings suggest that the maintenance of DNA methylation by DNMT1 plays a critical role in proper regulation of DNA replication in mammalian cells. Copyright © 2015 Elsevier Inc. All rights reserved.

  9. Maintenance of a physically active lifestyle after pulmonary rehabilitation in patients with COPD: a qualitative study toward motivational factors.

    Science.gov (United States)

    Stewart, Kelly F J; Meis, Jessie J M; van de Bool, Coby; Janssen, Daisy J A; Kremers, Stef P J; Schols, Annemie M W J

    2014-09-01

    To explore determinants of behavior change maintenance of a physically active lifestyle in patients with chronic obstructive pulmonary disease (COPD) 8-11 months after completion of a 4-month outpatient pulmonary rehabilitation program. A qualitative descriptive study of semistructured interviews. Pulmonary rehabilitation assessment center. Patients with COPD. Semistructured interviews until data saturation, coded by 2 independent researchers. Patients were classified as responder (maintenance or improvement) or nonresponder (relapse or decrease), based on 3 quantitative variables reflecting exercise capacity (Constant Work Rate Test), health-related quality of life (Short-Form health survey [SF-36]), and self-management abilities (Self-Management Ability Scale [SMAS-30/Version 2]). Mean (SD) forced expiratory volume in the first second (FEV1) among interviewees was 52.5% (14.4%) predicted and the mean age was 63.5 years (range: 45-78). The group consisted of 15 responders and 7 nonresponders. Physical limitations reduced competence to engage in an active lifestyle and responders appeared to experience higher levels of perceived competence. Social support was found important and the experienced understanding from fellow patients made exercising together enjoyable. Particularly, responders expressed autonomous motivation and said they exercised because of the benefits they gain from it. Unexpectedly, only responders also experienced controlled motivation. Perceived competence and autonomous motivation are important determinants for maintenance of an active lifestyle in patients with COPD. In contrast to common theoretical assumptions, a certain threshold level of controlled motivation may remain important in maintaining a physically active lifestyle after a pulmonary rehabilitation program. Copyright © 2014 AMDA – The Society for Post-Acute and Long-Term Care Medicine. Published by Elsevier Inc. All rights reserved.

  10. Experience in the application of S.A.T. for maintenance training at Cernavoda N.P.P. - U1

    International Nuclear Information System (INIS)

    Erdinici, Abdula

    1999-01-01

    A short history of Maintenance Training at Cernavoda NPP Unit 1 will be presented highlighting the fact that: - Cernavoda NPP Unit 1 is the first nuclear power plant in Romania; - Construction/Commissioning and initial operation was done under the direct supervision of expert specialists (from Canada, Italy and US). In addition, the application of Systematic Approach to Training (S.A.T.) principles at Cernavoda NPP for all training activities will be addressed. A short history of how maintenance training activity developed over time will be detailed to address the following issues: - how the S.A.T. stages were applied; - how maintenance experience was gained during Unit 1 Construction/Commissioning initial operation and how this experience has been evaluated, credited and transferred; - how maintenance training was documented; - how the maintenance training activity is organized; - on-the-job training for maintenance personnel. Concerning other training activities at Cernavoda NPP the maintenance begins with a training needs analysis for each maintenance position. These needs are documented through Job Related Training requirements (JRTR's) produced for each maintenance position. During commissioning/initial operation, only necessary maintenance training has been delivered, such as: pump alignments, use of maintenance procedure, application of maintenance documentation. The 'hands-on' activities under expatriates specialists supervision was the main training activity. Training coordinators for each maintenance activity (Mechanical, EI. I-and-C, and Services maintenance) have been appointed to administer maintenance training. Following the declaration of the unit in commercial operation, a new approach has been taken related to maintenance Bucharest A Task Force to evaluate maintenance training status and experience has been established. This group was initiated at the Training Department initiative and it was initially co-ordinated by a Canadian maintenance

  11. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)

  12. Excess thyroid hormone inhibits embryonic neural stem/progenitor cells proliferation and maintenance through STAT3 signalling pathway.

    Science.gov (United States)

    Chen, Chunhai; Zhou, Zhou; Zhong, Min; Li, Maoquan; Yang, Xuesen; Zhang, Yanwen; Wang, Yuan; Wei, Aimin; Qu, Mingyue; Zhang, Lei; Xu, Shangcheng; Chen, Shude; Yu, Zhengping

    2011-07-01

    Hyperthyroidism is prevalent during pregnancy, but little is known about the effects of excess thyroid hormone on the development of embryonic neural stem/progenitor cells (NSCs), and the mechanisms underlying these effects. Previous studies indicate that STAT3 plays a crucial role in determining NSC fate during neurodevelopment. In this study, we investigated the effects of a supraphysiological dose of 3,5,3'-L-triiodothyronine (T3) on the proliferation and maintenance of NSCs derived from embryonic day 13.5 mouse neocortex, and the involvement of STAT3 in this process. Our results suggest that excess T3 treatment inhibits NSC proliferation and maintenance. T3 decreased tyrosine phosphorylation of JAK1, JAK2 and STAT3, and subsequently inhibited STAT3-DNA binding activity. Furthermore, proliferation and maintenance of NSCs were decreased by inhibitors of JAKs and STAT3, indicating that the STAT3 signalling pathway is involved in the process of NSC proliferation and maintenance. Taken together, these results suggest that the STAT3 signalling pathway is involved in the process of T3-induced inhibition of embryonic NSC proliferation and maintenance. These findings provide data for understanding the effects of hyperthyroidism during pregnancy on fetal brain development, and the mechanisms underlying these effects.

  13. Maintenance and management of refills NPP Cofrentes

    International Nuclear Information System (INIS)

    Salar, J.; Blanquer, N.

    2014-01-01

    Maintenance in a nuclear power plant is a discipline that requires considering multiple criteria. Many risks can be involved during the jobs execution, and the preparation of activities needs an important knowledge and experience. During outages, many pieces of equipment are reviewed and inspected, and there is a huge increase of the number of risks and variables needed to perform and adequate preparation, coordination and execution of the maintenance activities. Cofrentes Nuclear Power Plant has improved the Outage preparation organization, in order to get more people involved, and make sure that all the critical parameters have been considered for each outage work. (Author)

  14. Improving the development, use and control of maintenance procedures

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; Radford, L.R.; Wheeler, W.A.; Badalamente, R.V.

    1985-12-01

    This paper describes the results of a project conducted for the US Nuclear Regulatory Commission (NRC) to assess and document the need for guidance or regulatory involvement by the NRC in the development, upgrading, use and control of maintenance procedures in US nuclear power plants. Presented are the findings of the following activities: (1) a survey of current maintenance procedure practices in seven US nuclear power plants; (2) a review and analysis of plant administrative and maintenance procedures; (3) a survey of maintenance procedure practices in industries that share some characteristics with the nuclear industry; and (4) a review of the research pertaining to job performance aids and a brief analysis of their applicability to maintenance in nuclear power plants. Based on these findings, several recommendations to upgrade maintenance procedures are offered

  15. Towards Signalling Maintenance Scheduling for European Railway Traffic Management System

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad

    signalling system. Therefore, the entire maintenance system needs to change from the previous system to the newest system, and hence, new optimisation techniques need to be established so as to facilitate managers in creating ideal maintenance strategies. The aim of this thesis is to develop new maintenance......The European Railway Traffic Management System (ERTMS) is the newest signalling standard that has been introduced in the railway industry. The aim of ERTMS is to ensure better signalling communication amongst various train systems, and hence, to help in attaining improved connectivity and commuting...... between European countries. In various countries across the world, there is a gradual shift from the current signalling systems to ERTMS. Amongst the European countries, Denmark was the first country to commence a full upgrading of its signalling system to ERTMS. A variety of maintenance requirements...

  16. Proactive maintenance initiatives at Argonne National Laboratory-West

    International Nuclear Information System (INIS)

    Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

    1995-01-01

    In the late 1980's, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ''mentor'' roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I ampersand C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned

  17. New remote maintenance approach for TPX

    International Nuclear Information System (INIS)

    Davis, F.C.; Walker, M.S.; Brown, T.G.

    1993-01-01

    The Tokamak Physics Experiment (TPX), to be located at Princeton Plasma Physics Laboratory, will be a steady-state, high-performance fusion machine. It will use hydrogen fuel during its original operation, deuterium-deuterium (D-D) fuel for an extended intermediate period of time and then a limited number of runs using deuterium-tritium (D-T) fuel. The D-D operations wig generate neutron fluxes that will activate materials of the vacuum vessel. From that point on, the resulting ionizing radiation, which will continue to increase, particularly during D-T operation, will prevent personnel access into the vessel to perform either scheduled or unscheduled maintenance activities. All activities performed within the vacuum vessel must be accomplished using remote means. TPX has taken a new approach for remote maintenance of the components within the vacuum vessel. This document describes the system that is being developed

  18. An evaluation of the Browns Ferry Nuclear Plant preventive maintenance program based on reliability centered maintenance analysis

    International Nuclear Information System (INIS)

    McCullough, C.L.; McCullough, C.A.

    1989-01-01

    Reliability centered maintenance (RCM) techniques were used to support a preventative maintenance (PM) upgrade program (PMUP) performed at TVA Browns Ferry Nuclear Plant (BFNP). The purpose of the RCM analysis was to identify critical equipment based on risk and economic importance and to evaluate the PM activities applicable to that equipment. The analysis may be conveniently divided into three steps, which will be outlined in the Approach section of this paper. The net benefit of the RCM approach was a prioritization of the focus of the PM upgrade program so that plant components receive attention proportional to their importance, and assurance that PM activities properly address the most likely component failure causes

  19. PSO Based Optimization of Testing and Maintenance Cost in NPPs

    Directory of Open Access Journals (Sweden)

    Qiang Chou

    2014-01-01

    Full Text Available Testing and maintenance activities of safety equipment have drawn much attention in Nuclear Power Plant (NPP to risk and cost control. The testing and maintenance activities are often implemented in compliance with the technical specification and maintenance requirements. Technical specification and maintenance-related parameters, that is, allowed outage time (AOT, maintenance period and duration, and so forth, in NPP are associated with controlling risk level and operating cost which need to be minimized. The above problems can be formulated by a constrained multiobjective optimization model, which is widely used in many other engineering problems. Particle swarm optimizations (PSOs have proved their capability to solve these kinds of problems. In this paper, we adopt PSO as an optimizer to optimize the multiobjective optimization problem by iteratively trying to improve a candidate solution with regard to a given measure of quality. Numerical results have demonstrated the efficiency of our proposed algorithm.

  20. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  1. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  2. Predictive Maintenance (PdM) Centralization for Significant Energy Savings

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Dale

    2010-09-15

    Cost effective predictive maintenance (PdM) technologies and basic energy calculations can mine energy savings form processes or maintenance activities. Centralizing and packaging this information correctly empowers facility maintenance and reliability professionals to build financial justification and support for strategies and personnel to weather global economic downturns and competition. Attendees will learn how to: Systematically build a 'pilot project' for applying PdM and tracking systems; Break down a typical electrical bill to calculate energy savings; Use return on investment (ROI) calculations to identify the best and highest value options, strategies and tips for substantiating your energy reduction maintenance strategies.

  3. Annual summary report on surveillance and maintenance activities of the surplus contaminated facilities program at Oak Ridge National Laboratory for period ending September 30, 1991

    International Nuclear Information System (INIS)

    Cannon, T.R.; Ford, M.K.; Holder, L. Jr.

    1991-09-01

    The Surplus Contaminated Facilities Program (SCFP) was established at the Oak Ridge National Laboratory (ORNL) in 1985 to provide support for inactive contaminated facilities that were largely abandoned by the programs which they formerly served. This support provides for routine surveillance and maintenance (S ampersand M) and special projects beyond a routine nature when such actions are needed to ensure adequate protection of personnel or the environment. The facilities included in the program had been used for research, technology development, isotope production and processing, and waste management. Support for facilities in the SCFP has previously been provided by the Department of Energy's (DOE's) Office of Energy Research: Multiprogram Energy Laboratories -- Facilities Support (ERKG) because of multiprogram use of the facilities or because of the landlord responsibility of Energy Research. Recently, an integrated Decontamination and Decommissioning (D ampersand D) program within the DOE Office of Environmental Restoration and Waste Management has been established to collectively manage the former Surplus Facilities Management Program, Defense D ampersand D Program, and the KG-funded, ORNL-originated SCFP. This report gives an overview of the S ampersand M planning, routine S ampersand M, and special maintenance project activities which have occurred at the SCFP facilities during the 1991 Fiscal Year

  4. Formation of activation mechanism for investment maintenance management of gas industry enterprises

    Directory of Open Access Journals (Sweden)

    Вікторія Валеріївна Чорній

    2016-11-01

    Full Text Available The problematic aspects of the existing management mechanism of investment management of gas industry enterprises are analyzed in the article. The ways of their elimination are suggested in accordance with the Energy Strategy of Ukraine – 2035 at different levels of its operation. The ways of improving the investment management mechanism of the enterprises in this industry on three levels are proved. Activation mechanism for investment maintenance management of gas industry enterprises is developed as result of research. Its implementation will allow enterprises of the industry to increase its investment attractiveness and effectively carry out the procedure for enterprises’ entry to the market of initial public offering to raise the required amount of investment resources for the modernization of investigated industry.

  5. Oak Ridge Research Reactor shutdown maintenance and surveillance

    International Nuclear Information System (INIS)

    Coleman, G.H.; Laughlin, D.L.

    1990-10-01

    The Department of Energy ordered the Oak Ridge Research Center Reactor to be placed in permanent shutdown on July 14, 1987. Maintenance activities, both mechanical and instrument, were essentially routine in nature. The performance of the instrumentation for the facility was satisfactory, and maintenance required is provided. The performance of the process system was satisfactory, and maintenance required is indicated. The results of efficiency tests of the various gaseous-waste filters have been summarized and preparations for transfer of the facility to the remedial action program is also indicated

  6. The Bayesian statistical decision theory applied to the optimization of generating set maintenance

    International Nuclear Information System (INIS)

    Procaccia, H.; Cordier, R.; Muller, S.

    1994-11-01

    The difficulty in RCM methodology is the allocation of a new periodicity of preventive maintenance on one equipment when a critical failure has been identified: until now this new allocation has been based on the engineer's judgment, and one must wait for a full cycle of feedback experience before to validate it. Statistical decision theory could be a more rational alternative for the optimization of preventive maintenance periodicity. This methodology has been applied to inspection and maintenance optimization of cylinders of diesel generator engines of 900 MW nuclear plants, and has shown that previous preventive maintenance periodicity can be extended. (authors). 8 refs., 5 figs

  7. Reducing maintenance costs

    International Nuclear Information System (INIS)

    Zaiss, W.; Reuschle, K.; Baier, B.

    2002-01-01

    The increasingly more expensive maintenance measures, cuts in the cost budget, and the loss of know-how on the part of vendors all require a change of policy with respect to maintenance concepts of the part of operators. This also applies to the existing valve concepts, the drives included. Under these aspects, the current drive, which is self-actuated and actuated by outside media, for a parallel-plate valve of a nomial width of 700 was reconsidered. The effort served to reduce maintenance costs and, at the same time, simplify the drive concept as well as cut back on the number of in-service inspections. Moreover, the number of active components were to be minimized and installation conditions in the plant were to be improved. When the boundary conditions to be observed with respect to process technology had been laid down, the competent technical department developed a concept of modification of the drive. A major constituent part was the demonstration of the functioning capability of the new drive under accident conditions. It was achieved mainly by an analytical approach. In the resultant drive concept, the same control valves are employed to actuate a driving cylinder by means of self-actuation or by an outside medium as a function of pressure. (orig.) [de

  8. Preventive maintenance prioritization index of medical equipment using quality function deployment.

    Science.gov (United States)

    Saleh, Neven; Sharawi, Amr A; Elwahed, Manal Abd; Petti, Alberto; Puppato, Daniele; Balestra, Gabriella

    2015-05-01

    Preventive maintenance is a core function of clinical engineering, and it is essential to guarantee the correct functioning of the equipment. The management and control of maintenance activities are equally important to perform maintenance. As the variety of medical equipment increases, accordingly the size of maintenance activities increases, the need for better management and control become essential. This paper aims to develop a new model for preventive maintenance priority of medical equipment using quality function deployment as a new concept in maintenance of medical equipment. We developed a three-domain framework model consisting of requirement, function, and concept. The requirement domain is the house of quality matrix. The second domain is the design matrix. Finally, the concept domain generates a prioritization index for preventive maintenance considering the weights of critical criteria. According to the final scores of those criteria, the prioritization action of medical equipment is carried out. Our model proposes five levels of priority for preventive maintenance. The model was tested on 200 pieces of medical equipment belonging to 17 different departments of two hospitals in Piedmont province, Italy. The dataset includes 70 different types of equipment. The results show a high correlation between risk-based criteria and the prioritization list.

  9. Maintenance of relational information in working memory leads to suppression of the sensory cortex.

    Science.gov (United States)

    Ikkai, Akiko; Blacker, Kara J; Lakshmanan, Balaji M; Ewen, Joshua B; Courtney, Susan M

    2014-10-15

    Working memory (WM) for sensory-based information about individual objects and their locations appears to involve interactions between lateral prefrontal and sensory cortexes. The mechanisms and representations for maintenance of more abstract, nonsensory information in WM are unknown, particularly whether such actively maintained information can become independent of the sensory information from which it was derived. Previous studies of WM for individual visual items found increased electroencephalogram (EEG) alpha (8-13 Hz) power over posterior electrode sites, which appears to correspond to the suppression of cortical areas that represent irrelevant sensory information. Here, we recorded EEG while participants performed a visual WM task that involved maintaining either concrete spatial coordinates or abstract relational information. Maintenance of relational information resulted in higher alpha power in posterior electrodes. Furthermore, lateralization of alpha power due to a covert shift of attention to one visual hemifield was marginally weaker during storage of relational information than during storage of concrete information. These results suggest that abstract relational information is maintained in WM differently from concrete, sensory representations and that during maintenance of abstract information, posterior sensory regions become task irrelevant and are thus suppressed. Copyright © 2014 the American Physiological Society.

  10. Management Tools for Bus Maintenance: Current Practices and New Methods. Final Report.

    Science.gov (United States)

    Foerster, James; And Others

    Management of bus fleet maintenance requires systematic recordkeeping, management reporting, and work scheduling procedures. Tools for controlling and monitoring routine maintenance activities are in common use. These include defect and fluid consumption reports, work order systems, historical maintenance records, and performance and cost…

  11. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  12. Maintenance rule: a system to guarantee maintenance effectiveness

    International Nuclear Information System (INIS)

    Torralbo, J.R.

    1995-01-01

    In the last few years, maintenance activities in nuclear plants have been given prime attention in view of their repercussion on the performance of such plants. One of the results of that attention is a new rule published in the U.S. known as M aintenance Rule . The paper describes the philosophy and main guidelines of the new regulation, and presents the procedure brought into action by the nuclear industry in Spain so to make their application contribute to a real improvement of safety and performance in nuclear plants. (Author)

  13. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  14. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  15. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  16. Attention modulates maintenance of representations in visual short-term memory.

    Science.gov (United States)

    Kuo, Bo-Cheng; Stokes, Mark G; Nobre, Anna Christina

    2012-01-01

    Recent studies have shown that selective attention is of considerable importance for encoding task-relevant items into visual short-term memory (VSTM) according to our behavioral goals. However, it is not known whether top-down attentional biases can continue to operate during the maintenance period of VSTM. We used ERPs to investigate this question across two experiments. Specifically, we tested whether orienting attention to a given spatial location within a VSTM representation resulted in modulation of the contralateral delay activity (CDA), a lateralized ERP marker of VSTM maintenance generated when participants selectively encode memory items from one hemifield. In both experiments, retrospective cues during the maintenance period could predict a specific item (spatial retrocue) or multiple items (neutral retrocue) that would be probed at the end of the memory delay. Our results revealed that VSTM performance is significantly improved by orienting attention to the location of a task-relevant item. The behavioral benefit was accompanied by modulation of neural activity involved in VSTM maintenance. Spatial retrocues reduced the magnitude of the CDA, consistent with a reduction in memory load. Our results provide direct evidence that top-down control modulates neural activity associated with maintenance in VSTM, biasing competition in favor of the task-relevant information.

  17. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  18. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  19. Task control signals in pediatric Tourette syndrome show evidence of immature and anomalous functional activity

    Directory of Open Access Journals (Sweden)

    Jessica A Church

    2009-11-01

    Full Text Available Tourette Syndrome (TS is a pediatric movement disorder that may affect control signaling in the brain. Previous work has proposed a dual-networks architecture of control processing involving a task-maintenance network and an adaptive control network (Dosenbach et al., 2008. A prior resting-state functional connectivity MRI (rs-fcMRI analysis in TS has revealed functional immaturity in both putative control networks, with “anomalous” correlations (i.e. correlations outside the typical developmental range limited to the adaptive control network (Church et al., 2009. The present study used functional MRI (fMRI to study brain activity related to adaptive control (by studying start-cues signals, and to task-maintenance (by studying signals sustained across a task set. Two hypotheses from the previous rs-fcMRI results were tested. First, adaptive control (i.e., start-cue activity will be altered in TS, including activity inconsistent with typical development (“anomalous”. Second, group differences found in task maintenance (i.e., sustained activity will be consistent with functional immaturity in TS. We examined regions found through a direct comparison of adolescents with and without TS, as well as regions derived from a previous investigation that showed differences between unaffected children and adults. The TS group showed decreased start-cue signal magnitude in regions where start-cue activity is unchanged over typical development, consistent with anomalous adaptive control. The TS group also had higher magnitude sustained signals in frontal cortex regions that overlapped with regions showing differences over typical development, consistent with immature task maintenance in TS. The results demonstrate task-related fMRI signal differences anticipated by the atypical functional connectivity found previously in adolescents with TS, strengthening the evidence for functional immaturity and anomalous signaling in control networks in adolescents

  20. A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem

    DEFF Research Database (Denmark)

    Rahmati, Seyed Habib A.; Ahmadi, Abbas; Govindan, Kannan

    2018-01-01

    the level of the system optimization. By means of this equipment, managers can benefit from a condition-based maintenance (CBM) for monitoring and managing their system. The chief aim of the paper is to develop a stochastic maintenance problem based on CBM activities engaged with a complex applied......Integrated consideration of production planning and maintenance processes is a real world assumption. Specifically, by improving the monitoring equipment such as various sensors or product-embedded information devices in recent years, joint assessment of these processes is inevitable for enhancing...... production problem called flexible job shop scheduling problem (FJSP). This integrated problem considers two maintenance scenarios in terms of corrective maintenance (CM) and preventive maintenance (PM). The activation of scenario is done by monitoring the degradation condition of the system and comparing...

  1. Towards total productive maintenance in the Eastern European mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Buck, J.D. [Kepner-Tregoe (United Kingdom) Ltd., Windsor

    1999-08-01

    An European Union consultancy project was undertaken to install a `best-in-class` maintenance system for the lignite mines of Romania. The project, funded by PHARE, started with a critical analysis of the maintenance and repair systems of equipment in both the open-pit and underground mines operated by RALO (Regia Autonoma a Lignitului Octenia). This study paved the way for the introduction of a computerised maintenance system and the inception of a planned preventative maintenance scheme. A development strategy leading by a structural methodology towards predictive maintenance and total productive maintenance was drawn up and attention was given to multi-skilling, training and further facilitating activities to enable the success of the total productive maintenance strategy. An abridged version of the paper was presented at MAINTE 97, held in Birmingham, UK in 1997. 5 refs., 5 figs., 1 tab.

  2. Jointly Production and Correlated Maintenance Optimization for Parallel Leased Machines

    Directory of Open Access Journals (Sweden)

    Tarek ASKRI

    2017-04-01

    Full Text Available This paper deals with a preventive maintenance strategy optimization correlated to production for a manufacturing system made by several parallel machines under lease contract. In order to minimize the total cost of production and maintenance by reducing the production system interruptions due to maintenance activities, a correlated group preventive maintenance policy is developed using the gravity center approach (GCA. The aim of this study is to determine an economical production plan and an optimal group preventive maintenance interval Tn at which all machines are maintained simultaneously. An analytical correlation between failure rate of machines and production level is considered and the impact of the preventive maintenance policy on the production plan is studied. Finally, the proposed maintenance policy GPM is compared with an individual simple strategy approach IPM in order to illustrate its efficiency.

  3. Maintenance - a design perspective

    International Nuclear Information System (INIS)

    Hedges, K.R.

    1992-01-01

    The paper describes how the CANDU-3 has incorporated, at the design stage, maintenance requirements such as component accessibility, standardization, ease of replacement, reduction in the number of components, and simplified component design. AECL is also active in the planned rehabilitation of the four units at Ontario Hydro's Bruce A nuclear generating station. In addition to conceptual design and development, detailed design and analysis, procurement and site assistance, AECL's Sheridan Park Laboratory will provide important development and mockup facilities. An AECL research and development program on reactor maintenance includes the identification and characterization of aging and degrading mechanisms, the tailoring of developed products to plant requirements, and the identification of areas of international cooperation and information exchange. 3 tabs., 1 fig

  4. Regulatory surveillance of safety related maintenance at nuclear power plants. Report of a technical committee meeting

    International Nuclear Information System (INIS)

    1997-08-01

    The operational safety and reliability of a nuclear power plant as well as its availability for electricity generation depend on, among other things, its maintenance programme. Regulatory bodies therefore have considerable interest in maintenance activities. There are several approaches to maintenance, i.e. reliability centered maintenance or risk focused maintenance, aimed at optimizing maintenance by focusing on important components or systems. These approaches may result in significant changes to maintenance activities and therefore have to be considered for regulatory acceptance. In order to review and discuss the status of maintenance regulation in participating countries, the IAEA convened a Technical Committee Meeting on Regulatory Oversight of Maintenance Activities at Nuclear Power Plants in Vienna from 9 to 13 October 1995. The meeting was attended by 16 experts from 11 countries. In addition to the consideration of papers that were presented and which are reproduced here, extensive group and panel discussions took place during the meeting. These covered three main topics: general features and basic characteristics of maintenance regulation, regulatory acceptance of maintenance optimization and use of PSA for maintenance optimization. The discussion are summarized in Section 2. Section 3 discusses the following three additional topics: regulatory involvement in the maintenance programme, modifications to the maintenance programme and personnel related aspects of maintenance. The conclusions are presented in Section 4. Figs, tabs

  5. Long-Term Body Weight Maintenance among StrongWomen–Healthy Hearts Program Participants

    Directory of Open Access Journals (Sweden)

    Rebecca A. Seguin

    2017-01-01

    Full Text Available Background. The repeated loss and regain of body weight, referred to as weight cycling, may be associated with negative health complications. Given today’s obesity epidemic and related interventions to address obesity, it is increasingly important to understand contexts and factors associated with weight loss maintenance. This study examined BMI among individuals who had previously participated in a 12-week, evidence-based, nationally disseminated nutrition and physical activity program designed for overweight and obese middle-aged and older women. Methods. Data were collected using follow-up surveys. Complete height and weight data were available for baseline, 12-week program completion (post-program and follow-up (approximately 3 years later for 154 women (response rate = 27.5%; BMI characteristics did not differ between responders and nonresponders. Results. Mean BMI decreased significantly from baseline to post-program (−0.5, P<0.001 and post-program to follow-up (−0.7, P<0.001. Seventy-five percent of survey respondents maintained or decreased BMI post-program to follow-up. Self-efficacy and social support for healthy eating behaviors (but not physical activity were associated with BMI maintenance or additional weight loss. Conclusions. These findings support the durability of weight loss following participation in a relatively short-term intervention.

  6. Remote maintenance challenges presented in the ITER engineering design

    International Nuclear Information System (INIS)

    Burgess, T.W.; Herndon, J.N.; Schrock, S.L.; Lousteau, D.C.

    1995-01-01

    Leading fusion energy research institutions are currently engaged in the Engineering Design Activity for the International Thermonuclear Experimental Reactor (ITER). A tokamak reactor design is evolving which emphasizes high system performance in a minimum overall reactor and building size. The resulting high component density dictates careful attention to ITER remote maintenance considerations in the development of the configuration. The complexity and scale of ITER remote maintenance tasks are well beyond the scope of today's experience and technology. This paper discusses the remote maintenance philosophy, describes the basic configuration as it relates to maintenance, and describes the basic procedures and equipment required. Key enabling technology research and development needs are also addressed

  7. CaMKII Requirement for in Vivo Insular Cortex LTP Maintenance and CTA Memory Persistence

    Directory of Open Access Journals (Sweden)

    Yectivani Juárez-Muñoz

    2017-11-01

    Full Text Available Calcium-calmodulin/dependent protein kinase II (CaMKII plays an essential role in LTP induction, but since it has the capacity to remain persistently activated even after the decay of external stimuli it has been proposed that it can also be necessary for LTP maintenance and therefore for memory persistence. It has been shown that basolateral amygdaloid nucleus (Bla stimulation induces long-term potentiation (LTP in the insular cortex (IC, a neocortical region implicated in the acquisition and retention of conditioned taste aversion (CTA. Our previous studies have demonstrated that induction of LTP in the Bla-IC pathway before CTA training increased the retention of this task. Although it is known that IC-LTP induction and CTA consolidation share similar molecular mechanisms, little is known about the molecular actors that underlie their maintenance. The purpose of the present study was to evaluate the role of CaMKII in the maintenance of in vivo Bla-IC LTP as well as in the persistence of CTA long-term memory (LTM. Our results show that acute microinfusion of myr-CaMKIINtide, a selective inhibitor of CaMKII, in the IC of adult rats during the late-phase of in vivo Bla-IC LTP blocked its maintenance. Moreover, the intracortical inhibition of CaMKII 24 h after CTA acquisition impairs CTA-LTM persistence. Together these results indicate that CaMKII is a central key component for the maintenance of neocortical synaptic plasticity as well as for persistence of CTA-LTM.

  8. Semi-pervasive interface on a virtual reality based training system for live line maintenance activities on energy distribution networks; Interface semi-pervasiva em um sistema de treinamento baseado em realidade virtual para atividades de manutencao em linha viva em redes de distribuicao de energia

    Energy Technology Data Exchange (ETDEWEB)

    Geus, Klaus de; Otto Filho, Eduardo; Goulart, Jomar Centeno [Companhia Paranaense de Energia (COPEL), Curitiba, PR (Brazil)], Emails: klaus@copel.com, eduardo.otto@copel.com, jomarcg@copel.com; Scheer, Sergio; Buriol, Tiago Martinuzzi; Rosendo, Matheus [Universidade Federal do Parana (UFPR), Curitiba, PR (Brazil)], Emails: scheer@ufpr.br, tiagoburiol@gmail.com, matheusrosendo@gmail.com; Felsky Filho, Carlos Eduardo [Instituto de Tecnologia para o Desenvolvimento (LACTEC), Curitiba, PR (Brazil)], Email: felsky@latec.org.br

    2010-04-15

    Techniques for live-line maintenance are those performed on power distribution networks without interrupting the flow of energy. This practice net avoids costs, but it is considered high-risk. Thus the effectiveness of previous training is very important and, therefore, constant efforts are made to find resources in order to improve the knowledge retention and quality of information provided. This paper discusses the development of a semi-immersive VR system for training of live-line maintenance activities. Aspects of the development software, its characteristics and functional model, in addition to the interactive devices are presented and the choices justified. The goal is to describe an unprecedented platform which uses devices the Nintendo Wii to provide a novel model of interaction and navigation in professional activities. This model is focused on some principles of ubiquitous computing and tangible interaction. (author)

  9. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Binrong

    2017-01-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  10. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xuejuan; Wang, Binrong

    2017-07-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  11. Initiating stochastic maintenance optimization at Candu Power Plants

    International Nuclear Information System (INIS)

    Doyle, E.K.

    2003-01-01

    As previously reported at ICONE 6 in New Orleans (1996), the use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Further cost refinement of the station maintenance strategy is being evaluated via the applicability of statistical analysis of historical failure data. Since the statistical evaluation was initiated in 1999 significant progress has been made in demonstrating the viability of stochastic methods in Candu maintenance. Some of the relevant results were presented at ICONE 10 in Washington DC (2002). Success with the graphical displays and the relatively easy to implement stochastic computer programs was sufficient to move the program along to the next significant phase. This next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principle impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. (author)

  12. Developing a CANDU industry maintenance guide. A 'community of practice' compendium

    International Nuclear Information System (INIS)

    Von Hatten, P.; Hoye, D.S.

    2011-01-01

    The CANDU Owners Group (COG) has initiated a joint utility project to create an Industry Maintenance Guide. The primary goal of the guide is to provide a structured template of activities to implement the maintenance program, based on industry best practices, and with consideration for new regulatory requirements identified in the Canadian Nuclear Safety Commission document S210. The guide will be prepared with a macro view of the maintenance program, which includes core maintenance activities as well as supporting activities and programs in Engineering, Supply Chain and Work Management. Currently there is no such document that solidly links all the requirements to develop, support and execute a maintenance program. Some elements are captured in various industry documents such as INPO documents AP928, Work Management, AP913, Equipment Reliability and AP908, Materials and Services. The guide will not replicate these good practices, but will focus on how they are linked and interrelate to create an optimum program. It is expected that utilities will be able to utilize the guide to take the next incremental step in performance based on cross functional alignment and efficiency.

  13. Analysis of the Determinant Factors Development of Maintenance Culture in Malaysian Local Authorities

    Directory of Open Access Journals (Sweden)

    Sani S.I.A.

    2014-01-01

    Full Text Available Malaysia is a fast growing developing country and its vision is becoming a developed country with a first class infrastructure. Towards this vision, the assets and facilities were developed, owned or leased by public sector especially buildings, constructions and infrastructures to fulfill administrative and social needs as well as economic responsibilities to general public. In Malaysia, public asset and facilities is owned by three major levels of government, which are the federal government, state government and the local government also known as local authority. Between these three forms of government, Local Authorities hold a large number of facilities that place demands on resources. They have a responsibility to use and maintain a wide range of property assets including classified and heritage buildings, single purpose facilities and state of the art multipurpose facilities. Over the years, the local authorities in Malaysia currently have been soundly criticized by public caused poor maintenance culture. The assets especially public buildings and infrastructures are not maintained properly. Thus, developing the maintenance culture is essential to increase the awareness about maintenance activity on public facilities and assets in Malaysian Local Authorities. Regarding this scenario, the purpose of this study is to determine the determinant factors affecting development of maintenance culture identified based on the review of previous research. As a guide to achieve the research objective, a questionnaire survey was conducted to investigate the significance of ten determinant factors identified in the research study and their related affecting to development of maintenance culture in local authority as a respondent in this research. The collected data was then analyzed using quantitative approaches such as mean analysis, relative important index as well as others.

  14. LHC Report: The machine under maintenance

    CERN Multimedia

    Katy Foraz for the LHC Team

    2012-01-01

    The LHC Christmas break started on 12 December. Since then, teams have been working hard to complete all the maintenance work planned to ensure the reliable operation of the LHC in 2012.   Installation of shielding at Point 1. The maintenance work is being carried out on key infrastructure such as the cooling, ventilation, electricity and safety systems. Maintenance work is being carried out not just in the LHC but also across the whole accelerator complex, which makes planning the work even more complicated. At the time of going to print, 50% of the cryogenics system maintenance has been finished, which, according to the schedule, will allow the LHC teams to start cooling down the first sectors next week to have the entire machine cold by the end of February. A lot of activity is going on in order to mitigate the effects of radiation on equipment installed in the LHC tunnel and underground areas during 2012 operation. To this end, teams have installed additional shielding at Point 1 (see ph...

  15. The spacing between adjacent binding sites in the family of repeats affects the functions of Epstein-Barr nuclear antigen 1 in transcription activation and stable plasmid maintenance.

    Science.gov (United States)

    Hebner, Christy; Lasanen, Julie; Battle, Scott; Aiyar, Ashok

    2003-07-05

    Epstein-Barr virus (EBV) and the closely related Herpesvirus papio (HVP) are stably replicated as episomes in proliferating latently infected cells. Maintenance and partitioning of these viral plasmids requires a viral sequence in cis, termed the family of repeats (FR), that is bound by a viral protein, Epstein-Barr nuclear antigen 1 (EBNA1). Upon binding FR, EBNA1 maintains viral genomes in proliferating cells and activates transcription from viral promoters required for immortalization. FR from either virus encodes multiple binding sites for the viral maintenance protein, EBNA1, with the FR from the prototypic B95-8 strain of EBV containing 20 binding sites, and FR from HVP containing 8 binding sites. In addition to differences in the number of EBNA1-binding sites, adjacent binding sites in the EBV FR are typically separated by 14 base pairs (bp), but are separated by 10 bp in HVP. We tested whether the number of binding sites, as well as the distance between adjacent binding sites, affects the function of EBNA1 in transcription activation or plasmid maintenance. Our results indicate that EBNA1 activates transcription more efficiently when adjacent binding sites are separated by 10 bp, the spacing observed in HVP. In contrast, using two separate assays, we demonstrate that plasmid maintenance is greatly augmented when adjacent EBNA1-binding sites are separated by 14 bp, and therefore, presumably lie on the same face of the DNA double helix. These results provide indication that the functions of EBNA1 in transcription activation and plasmid maintenance are separable.

  16. The spacing between adjacent binding sites in the family of repeats affects the functions of Epstein-Barr nuclear antigen 1 in transcription activation and stable plasmid maintenance

    International Nuclear Information System (INIS)

    Hebner, Christy; Lasanen, Julie; Battle, Scott; Aiyar, Ashok

    2003-01-01

    Epstein-Barr virus (EBV) and the closely related Herpesvirus papio (HVP) are stably replicated as episomes in proliferating latently infected cells. Maintenance and partitioning of these viral plasmids requires a viral sequence in cis, termed the family of repeats (FR), that is bound by a viral protein, Epstein-Barr nuclear antigen 1 (EBNA1). Upon binding FR, EBNA1 maintains viral genomes in proliferating cells and activates transcription from viral promoters required for immortalization. FR from either virus encodes multiple binding sites for the viral maintenance protein, EBNA1, with the FR from the prototypic B95-8 strain of EBV containing 20 binding sites, and FR from HVP containing 8 binding sites. In addition to differences in the number of EBNA1-binding sites, adjacent binding sites in the EBV FR are typically separated by 14 base pairs (bp), but are separated by 10 bp in HVP. We tested whether the number of binding sites, as well as the distance between adjacent binding sites, affects the function of EBNA1 in transcription activation or plasmid maintenance. Our results indicate that EBNA1 activates transcription more efficiently when adjacent binding sites are separated by 10 bp, the spacing observed in HVP. In contrast, using two separate assays, we demonstrate that plasmid maintenance is greatly augmented when adjacent EBNA1-binding sites are separated by 14 bp, and therefore, presumably lie on the same face of the DNA double helix. These results provide indication that the functions of EBNA1 in transcription activation and plasmid maintenance are separable

  17. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    Science.gov (United States)

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm. PMID:24883414

  18. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Jun-qing Li

    2014-01-01

    Full Text Available A hybrid algorithm which combines particle swarm optimization (PSO and iterated local search (ILS is proposed for solving the hybrid flowshop scheduling (HFS problem with preventive maintenance (PM activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron’s benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm.

  19. Hybrid particle swarm optimization for hybrid flowshop scheduling problem with maintenance activities.

    Science.gov (United States)

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm.

  20. Reliability and risk treatment centered maintenance

    International Nuclear Information System (INIS)

    Pexa, Martin; Hladik, Tomas; Ales, Zdenek; Legat, Vaclav; Muller, Miroslav; Valasek, Petr; Havlu, Vit

    2014-01-01

    We propose a new methodology for application of well-known tools - RCM, RBI and SIF pro - with the aim to treat risks by means of suitable maintenance. The basis of the new methodology is the complex application of all three methods at the same time and not separately as is typical today. The proposed methodology suggests having just one managing team for reliability and risk treatment centred maintenance (RRTCM), employing existing RCM, RBI, and SIFpro tools concurrently. This approach allows for significant reduction of engineering activities' duration. In the proposed methodology these activities are staged into five phases and structured to eliminate all duplication resulting from separate application of the three tools. The newly proposed methodology saves 45% to 50% of the engineering workload and dequate significant financial savings.

  1. Reliability and risk treatment centered maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Pexa, Martin; Hladik, Tomas; Ales, Zdenek; Legat, Vaclav; Muller, Miroslav; Valasek, Petr [Czech University of Life Sciences Prague, Kamycka (Czech Republic); Havlu, Vit [Unipetrol A. S, Prague (Czech Republic)

    2014-10-15

    We propose a new methodology for application of well-known tools - RCM, RBI and SIF pro - with the aim to treat risks by means of suitable maintenance. The basis of the new methodology is the complex application of all three methods at the same time and not separately as is typical today. The proposed methodology suggests having just one managing team for reliability and risk treatment centred maintenance (RRTCM), employing existing RCM, RBI, and SIFpro tools concurrently. This approach allows for significant reduction of engineering activities' duration. In the proposed methodology these activities are staged into five phases and structured to eliminate all duplication resulting from separate application of the three tools. The newly proposed methodology saves 45% to 50% of the engineering workload and dequate significant financial savings.

  2. Technology Trend in the Maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yoon, Kyungsup; Lee, Unjang

    2014-01-01

    In this paper, overall technology evolution is reviewed and the improvements in the plant safety, reliability and productivity are described. And the issue and some recommendation for better maintenance of Korean nuclear power plants are presented as the interim study results on the 'Management and Regulatory Policy for the Nuclear Power Plant Maintenance and Equipment Reliability' under the agreement with the Nuclear Safety and Security Commission. The future trend in the maintenance technologies is also covered. Maintenance is the essential element for the enhancement of plant safety, reliability and economics and also for public safety. Therefore the regulator's involvements and the utility's active participation is inevitable for the better maintenance. For the better sustainability of our nuclear power plants the followings are recommended. ·Establishment of the good maintenance program and continuous improvement. ·Application of OLM on the safety related and non-safety related components by step-by-step approach. ·Improvement PRA technology for the accurate and reliable risk analysis. ·Continuous training and cultivation for the qualified maintenance personnel

  3. Technology Trend in the Maintenance of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Kyungsup; Lee, Unjang [CTO and CEO, Seoul (Korea, Republic of)

    2014-05-15

    In this paper, overall technology evolution is reviewed and the improvements in the plant safety, reliability and productivity are described. And the issue and some recommendation for better maintenance of Korean nuclear power plants are presented as the interim study results on the 'Management and Regulatory Policy for the Nuclear Power Plant Maintenance and Equipment Reliability' under the agreement with the Nuclear Safety and Security Commission. The future trend in the maintenance technologies is also covered. Maintenance is the essential element for the enhancement of plant safety, reliability and economics and also for public safety. Therefore the regulator's involvements and the utility's active participation is inevitable for the better maintenance. For the better sustainability of our nuclear power plants the followings are recommended. ·Establishment of the good maintenance program and continuous improvement. ·Application of OLM on the safety related and non-safety related components by step-by-step approach. ·Improvement PRA technology for the accurate and reliable risk analysis. ·Continuous training and cultivation for the qualified maintenance personnel.

  4. RCM optimization of a system under both preventive and corrective maintenance

    International Nuclear Information System (INIS)

    Bris, R.; Cepin, M.

    2005-01-01

    Testing and maintenance activities of power electrical equipment are an important potential for both risk and cost reduction. A multi-objective maintenance optimization method is presented based on the Genetic Algorithms (GA) technique. The method determines the optimal schedule of preventive maintenance actions based on minimization both selected risk measure and cost. Applied cost model takes into account both preventive and corrective maintenance. This paper also presents application of the methodology to optimize maintenance of a real distribution network 22 kV. Conclusions and recommendations for practice are made on the basis of obtained results. (author)

  5. A multi-criteria model for maintenance job scheduling

    Directory of Open Access Journals (Sweden)

    Sunday A. Oke

    2007-12-01

    Full Text Available This paper presents a multi-criteria maintenance job scheduling model, which is formulated using a weighted multi-criteria integer linear programming maintenance scheduling framework. Three criteria, which have direct relationship with the primary objectives of a typical production setting, were used. These criteria are namely minimization of equipment idle time, manpower idle time and lateness of job with unit parity. The mathematical model constrained by available equipment, manpower and job available time within planning horizon was tested with a 10-job, 8-hour time horizon problem with declared equipment and manpower available as against the required. The results, analysis and illustrations justify multi-criteria consideration. Thus, maintenance managers are equipped with a tool for adequate decision making that guides against error in the accumulated data which may lead to wrong decision making. The idea presented is new since it provides an approach that has not been documented previously in the literature.

  6. Application of Dr. Mainte, integrated simulator of maintenance optimization, to LWRs

    International Nuclear Information System (INIS)

    Isobe, Yoshihiro; Sagisaka, Mitsuyuki; Etoh, Junji; Matsunaga, Takashi; Kosaka, Toru; Matsumoto, Satoshi; Yoshimura, Shinobu

    2015-01-01

    Dr. Mainte, an integrated simulator for maintenance optimization of LWRs (Light Water Reactors) is based on PFM (Probabilistic Fracture Mechanics) analyses. The concept of the simulator is to provide a decision-making system to optimize maintenance activities for typical components and piping systems in nuclear power plants totally and quantitatively in terms of safety, availability, economic rationality, environmental impact and social acceptance. For the further improvement of the safety and availability of nuclear power plants, the effect of human error and its reduction on the optimization of maintenance activities have been studied. In addition, an approach of reducing human error is proposed. (author)

  7. Preventive and corrective maintenance for MINT EPS 3000 electron beam machine

    International Nuclear Information System (INIS)

    Siti Aiasah Hashim; Shaari Jahar

    2005-01-01

    Preventive and corrective maintenance of a high energy electron is to ensure that the machine would not fail during operation. MINT's EPS 3000 electron beam machine has been in operation for almost 12 years. Throughout those years, events relating to scheduled overhauls and unscheduled corrective maintenance had provided invaluable experience in the form of informal maintenance training to the operators. With the implementation of ISO 9001:2000 Quality Management System at the facility, the preventive and corrective maintenance program is becoming more structured and orderly. Collected maintenance data shall be used to initiate continual improvement activities in the facility.This paper describes MINT-ALURTRON's 12 years experience in providing maintenance work for the EPS 3000. (Author)

  8. Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization

    International Nuclear Information System (INIS)

    Sanchez, Ana; Carlos, Sofia; Martorell, Sebastian; Villanueva, Jose F.

    2009-01-01

    Optimization of testing and maintenance activities performed in the different systems of a complex industrial plant is of great interest as the plant availability and economy strongly depend on the maintenance activities planned. Traditionally, two types of models, i.e. deterministic and probabilistic, have been considered to simulate the impact of testing and maintenance activities on equipment unavailability and the cost involved. Both models present uncertainties that are often categorized as either aleatory or epistemic uncertainties. The second group applies when there is limited knowledge on the proper model to represent a problem, and/or the values associated to the model parameters, so the results of the calculation performed with them incorporate uncertainty. This paper addresses the problem of testing and maintenance optimization based on unavailability and cost criteria and considering epistemic uncertainty in the imperfect maintenance modelling. It is framed as a multiple criteria decision making problem where unavailability and cost act as uncertain and conflicting decision criteria. A tolerance interval based approach is used to address uncertainty with regard to effectiveness parameter and imperfect maintenance model embedded within a multiple-objective genetic algorithm. A case of application for a stand-by safety related system of a nuclear power plant is presented. The results obtained in this application show the importance of considering uncertainties in the modelling of imperfect maintenance, as the optimal solutions found are associated with a large uncertainty that influences the final decision making depending on, for example, if the decision maker is risk averse or risk neutral

  9. Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, Ana [Department of Statistics and Operational Research, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain); Carlos, Sofia [Department of Chemical and Nuclear Engineering, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain); Martorell, Sebastian [Department of Chemical and Nuclear Engineering, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain)], E-mail: smartore@iqn.upv.es; Villanueva, Jose F. [Department of Chemical and Nuclear Engineering, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain)

    2009-01-15

    Optimization of testing and maintenance activities performed in the different systems of a complex industrial plant is of great interest as the plant availability and economy strongly depend on the maintenance activities planned. Traditionally, two types of models, i.e. deterministic and probabilistic, have been considered to simulate the impact of testing and maintenance activities on equipment unavailability and the cost involved. Both models present uncertainties that are often categorized as either aleatory or epistemic uncertainties. The second group applies when there is limited knowledge on the proper model to represent a problem, and/or the values associated to the model parameters, so the results of the calculation performed with them incorporate uncertainty. This paper addresses the problem of testing and maintenance optimization based on unavailability and cost criteria and considering epistemic uncertainty in the imperfect maintenance modelling. It is framed as a multiple criteria decision making problem where unavailability and cost act as uncertain and conflicting decision criteria. A tolerance interval based approach is used to address uncertainty with regard to effectiveness parameter and imperfect maintenance model embedded within a multiple-objective genetic algorithm. A case of application for a stand-by safety related system of a nuclear power plant is presented. The results obtained in this application show the importance of considering uncertainties in the modelling of imperfect maintenance, as the optimal solutions found are associated with a large uncertainty that influences the final decision making depending on, for example, if the decision maker is risk averse or risk neutral.

  10. Knowledge representation for integrated plant operation and maintenance

    DEFF Research Database (Denmark)

    Lind, Morten

    2010-01-01

    Integrated operation and maintenance of process plants has many advantages. One advantage is the improved economy obtained by reducing the number of plant shutdowns. Another is to increase reliability of operation by monitoring of risk levels during on-line maintenance. Integrated plant operation...... and maintenance require knowledge bases which can capture the interactions between the two plant activities. As an example, taking out a component or a subsystem for maintenance during operation will require a knowledge base representing the interactions between plant structure, functions, operating states...... and goals and incorporate knowledge about redundancy and reliability data. Multilevel Flow Modeling can be used build knowledge bases representing plant goals and functions and has been applied for fault diagnosis and supervisory control but currently it does not take into account structural information...

  11. Annual report of the maintenance division for 1965

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-12-01

    The personnel of the Division is organized in groups, each responsible for a number of tasks related to maintenance of reactor mechanical structures, electric equipment, electronic equipment. According to the action plan for 1965 the division for RA reactor maintenance the main activities were: planned maintenance of the reactor components, planned repair of the main components, indispensable repairs during reactor operation, repair during planned shutdown periods and tasks related to improvement of operation components and systems. Quite a significant number of failures was related to electronic equipment resulting from failures of thermometers in the heavy water system due to vibrations of the pumps. A number of spare parts and tools were produced needed for maintenance of reactor components, as well as instruments for control and calibration of reactor measuring devices [sr

  12. New Models for Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.

    component that was causing a large amount of downtime were identified. Further analysis with the Reliability-Centred Maintenance concept helped determine the most appropriate maintenance strategy. In the final perspective, long-term strategic decisions were the focus. Asset Management and especially Asset...... Life-Cycle Management were studied using a case study. The case study analysis was used to generate strategies to help managers perform maintenance more proactively and to prepare the management of the offshore wind farm turbines for the future. Existing literature on Asset Life-Cycle Management has......Operations and maintenance (O&M) processes are important for keeping offshore wind turbines in operation. Costs related to such activities constitute approximately 30% of the lifetime cost of an offshore wind farm project. Currently, the offshore wind energy industry has shown a rapid increase...

  13. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    International Nuclear Information System (INIS)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully

  14. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully.

  15. Electrophysiological signatures of phonological and semantic maintenance in sentence repetition.

    Science.gov (United States)

    Meltzer, Jed A; Kielar, Aneta; Panamsky, Lilia; Links, Kira A; Deschamps, Tiffany; Leigh, Rosie C

    2017-08-01

    Verbal short-term memory comprises resources for phonological rehearsal, which have been characterized anatomically, and for maintenance of semantic information, which are less understood. Sentence repetition tasks tap both processes interactively. To distinguish brain activity involved in phonological vs. semantic maintenance, we recorded magnetoencephalography during a sentence repetition task, incorporating three manipulations emphasizing one mechanism over the other. Participants heard sentences or word lists and attempted to repeat them verbatim after a 5-second delay. After MEG, participants completed a cued recall task testing how much they remembered of each sentence. Greater semantic engagement relative to phonological rehearsal was hypothesized for 1) sentences vs. word lists, 2) concrete vs. abstract sentences, and 3) well recalled vs. poorly recalled sentences. During auditory perception and the memory delay period, we found highly left-lateralized activation in the form of 8-30 Hz event-related desynchronization. Compared to abstract sentences, concrete sentences recruited posterior temporal cortex bilaterally, demonstrating a neural signature for the engagement of visual imagery in sentence maintenance. Maintenance of arbitrary word lists recruited right hemisphere dorsal regions, reflecting increased demands on phonological rehearsal. Sentences that were ultimately poorly recalled in the post-test also elicited extra right hemisphere activation when they were held in short-term memory, suggesting increased demands on phonological resources. Frontal midline theta oscillations also reflected phonological rather than semantic demand, being increased for word lists and poorly recalled sentences. These findings highlight distinct neural resources for phonological and semantic maintenance, with phonological maintenance associated with stronger oscillatory modulations. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. Evolutionarily conserved mechanisms for the selection and maintenance of behavioural activity.

    Science.gov (United States)

    Fiore, Vincenzo G; Dolan, Raymond J; Strausfeld, Nicholas J; Hirth, Frank

    2015-12-19

    Survival and reproduction entail the selection of adaptive behavioural repertoires. This selection manifests as phylogenetically acquired activities that depend on evolved nervous system circuitries. Lorenz and Tinbergen already postulated that heritable behaviours and their reliable performance are specified by genetically determined programs. Here we compare the functional anatomy of the insect central complex and vertebrate basal ganglia to illustrate their role in mediating selection and maintenance of adaptive behaviours. Comparative analyses reveal that central complex and basal ganglia circuitries share comparable lineage relationships within clusters of functionally integrated neurons. These clusters are specified by genetic mechanisms that link birth time and order to their neuronal identities and functions. Their subsequent connections and associated functions are characterized by similar mechanisms that implement dimensionality reduction and transition through attractor states, whereby spatially organized parallel-projecting loops integrate and convey sensorimotor representations that select and maintain behavioural activity. In both taxa, these neural systems are modulated by dopamine signalling that also mediates memory-like processes. The multiplicity of similarities between central complex and basal ganglia suggests evolutionarily conserved computational mechanisms for action selection. We speculate that these may have originated from ancestral ground pattern circuitries present in the brain of the last common ancestor of insects and vertebrates. © 2015 The Authors.

  17. Optimizing Maintenance Planning in the Production Industry Using the Markovian Approach

    Directory of Open Access Journals (Sweden)

    B Kareem

    2012-12-01

    Full Text Available Maintenance is an essential activity in every manufacturing establishment, as manufacturing effectiveness counts on the functionality of production equipment and machinery in terms of their productivity and operational life. Maintenance cost minimization can be achieved by adopting an appropriate maintenance planning policy. This paper applies the Markovian approach to maintenance planning decision, thereby generating optimal maintenance policy from the identified alternatives over a specified period of time. Markov chains, transition matrices, decision processes, and dynamic programming models were formulated for the decision problem related to maintenance operations of a cable production company. Preventive and corrective maintenance data based on workloads and costs, were collected from the company and utilized in this study. The result showed variability in the choice of optimal maintenance policy that was adopted in the case study. Post optimality analysis of the process buttressed the claim. The proposed approach is promising for solving the maintenance scheduling decision problems of the company.

  18. Reliability-based performance simulation for optimized pavement maintenance

    International Nuclear Information System (INIS)

    Chou, Jui-Sheng; Le, Thanh-Son

    2011-01-01

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: →A novel algorithm using multi-objective particle swarm optimization technique. → Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. → A probabilistic model for regression parameters is employed to assess reliability-based performance. → The proposed approach can help decision makers to optimize roadway maintenance plans.

  19. Reliability-based performance simulation for optimized pavement maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Jui-Sheng, E-mail: jschou@mail.ntust.edu.tw [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China); Le, Thanh-Son [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China)

    2011-10-15

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: > A novel algorithm using multi-objective particle swarm optimization technique. > Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. > A probabilistic model for regression parameters is employed to assess reliability-based performance. > The proposed approach can help decision makers to optimize roadway maintenance plans.

  20. Coordinating technician allocation and maintenance routing for offshore wind farms

    NARCIS (Netherlands)

    Schrotenboer, Albert H.; uit het Broek, Michiel A. J.; Jargalsaikhan, Bolor; Roodbergen, Kees Jan

    2018-01-01

    A maintenance activity at offshore wind farms requires a combination of technicians with different skills. At an operational level, it is important to fully utilize and coordinate technicians in order to increase efficiency of the short-term maintenance planning. In this paper, we investigate

  1. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  2. The ITER Remote Maintenance Management System

    International Nuclear Information System (INIS)

    Tesini, Alessandro; Rolfe, A.C.

    2009-01-01

    A major challenge for the ITER project is to develop and implement a Remote Maintenance System, which can deliver high Tokamak availability within the constraints of the overall ITER programme objectives. Much of the maintenance of ITER will be performed using remote handling methods and some with combined manual and remote activities working together. The organization and management of the ITER remote handling facilities will be of a scale unlike any other remote handling application in the world. The ITER remote handling design and procurement activities will require co-ordination and management across many different sites throughout the world. It will be a major challenge for the ITER project to ensure a consistent quality and technical approach in all of the contributing parties. To address this issue the IO remote handling team are implementing the ITER Maintenance Management Plan (IMMP) comprising an overarching document defining the policies and methodologies (ITER Remote Maintenance Management System or IMMS) and an associated ITER remote handling code of practise (IRHCOP). The IMMS will be in document form available as a pdf file or similar. The IRHCOP will be implemented as a web based application and will provide access to the central resource of the entire code of practise from any location in the world. The IRHCOP data library will be centrally controlled in order that users can be assured of the data relevance and authenticity. This paper will describe the overall approach being taken to deal with this challenge and go on to detail the structure and content of both the IMMS and the IRHCOP.

  3. Improving human performance in maintenance personnel

    International Nuclear Information System (INIS)

    Gonzalez Anez, Francisco; Agueero Agueero, Jorge

    2010-01-01

    The continuous evolution and improvement of safety-related processes has included the analysis, design and development of training plans for the qualification of maintenance nuclear power plant personnel. In this respect, the international references in this area recommend the establishment of systematic qualification programmes for personnel performing functions or carrying out safety related tasks. Maintenance personnel qualification processes have improved significantly, and training plans have been designed and developed based on Systematic Approach to Training methodology to each job position. These improvements have been clearly reflected in recent training programmes with new training material and training facilities focused not only on developing technical knowledge and skills but also on improving attitudes and safety culture. The objectives of maintenance training facilities such as laboratories, mock-ups real an virtual, hydraulic loops, field simulators and other training material to be used in the maintenance training centre are to cover training necessities for initial and continuous qualification. Evidently, all these improvements made in the qualification of plant personnel should be extended to include supplemental personnel (external or contracted) performing safety-related tasks. The supplemental personnel constitute a very spread group, covering the performance of multiple activities entailing different levels of responsibility. Some of these activities are performed permanently at the plant, while others are occasional or sporadic. In order to establish qualification requirements for these supplemental workers, it is recommended to establish a rigorous analysis of job positions and tasks. The objective will be to identify the qualification requirements to assure competence and safety. (authors)

  4. Control maintenance training program for special safety systems at Bruce B

    International Nuclear Information System (INIS)

    Reinwald, G.

    1997-01-01

    It was recognized from the early days of commissioning of Bruce B that Control Maintenance staff would require a level of expertise to be able to maintain Special Safety Systems in proper running order. In the early 80's this was achieved through hands on experience during the original commissioning, troubleshooting and placing of the various systems in service. Control maintenance procedures were developed and implemented as the new systems came available for commissioning, as were operating manuals,training manuals etc. Under the development of the Maintenance Manager, a Conduct of Maintenance section was organized. One of the responsibilities of this section was to develop a series of Maintenance Administrative Procedures (MAPs) that set the standards for maintenance activities including training

  5. Development of the tool infrastructure for implementation of the maintenance rule

    International Nuclear Information System (INIS)

    Lo, Chung-Kung; Hsu, Pi-Lin

    2009-01-01

    INER PSA Group helps the three operating plants in Taiwan to decide the importance of their scoped-in equipment in terms of risk significance and develop the application database software (MEMOS) to implement the maintenance effectiveness monitoring process. NER also develops a software tool (MIRU) used in the on-line maintenance scheduling and risk assessment process. It serves as a platform for the plants to plan their daily maintenance activities and perform the risk assessment in the future rolling on-line maintenance. The implementation of routine on-line maintenance will be a critical step towards improving the capacity factors and thus further enhancement of the performance of nuclear power in Taiwan

  6. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  7. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  8. A Naval Aviation Maintenance Organizational Activity Strategic Information System (OASIS)

    Science.gov (United States)

    1990-03-01

    Management Plan ( CIMP ) [Ref. 49] lists all information systems currently being planned or developed to support NAVAIR missions. The four "functional...in the CIMP . They include local area networks (LANs) for specific commands, systems dedicated to supporting one level of maintenance, systems designed

  9. The study of the maintenance for a cryogenics pilot plant in nuclear regime

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2002-01-01

    The Cryogenic Pilot Plant, CPP, has as goal the extraction of tritium from heavy water at the CANDU Reactors in Cernavoda. Its operation allows a continuos nuclear regime. CPP consists in several modules, each of them implying static and dynamical complex equipment in which fluids circulate at cryogenic temperatures. From these reasons it results that the CPP maintenance is essential. The relational structure regarding the integrated maintenance systems in the whole ICSI's activity is presented in the frame of management decision system and contains a procedural program of maintenance (PPM). PPM includes adoption strategy for maintenance activity in the conditions required by the Manuals worked out in compliance with QA of ICSI and specific regulations of operation in nuclear regime. An explanation based on a thorough analysis is given for the strategy of maintenance, the structure of modules and the use of informatics subsystems. The structure of PPM strategy has a flowchart implying: - Reorganization, Scientific background, and Operative Maintenance strategy (inside/outside strategy) as well as PPM stage realization and specifications for maintenance assurance (manuals, cards and subsystems). Also, provided in the maintenance strategy are the PPM preparatory and proper stage conceptions

  10. Maintenance concept development for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Macdonald, D.

    1988-01-01

    The Compact Ignition Tokamak (CIT), located at the Princeton Plasma Physics Laboratory, will be the next major experimental machine in the US Fusion Program. Its use of deuterium-tritium (D-T) fuel requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist of removing and repairing such components as diagnostic equipment modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the vacuum vessel includes both bridge-mounted and floor-mounted manipulator systems. Additionally, decontamination (decon) equipment, hot cell repair facilities, and equipment for handling and packaging solid radioactive waste (rad-waste) are being developed. Recent design activities have focused on establishing maintenance system interfaces with the facility design, developing manipulator system requirements, and using mock-ups to support the tokamak configuration design. 3 refs., 8 figs

  11. [STRATEGY OF USE AND MAINTENANCE OF CLINICAL HOSPITAL CENTER RIJEKA IN ACCORDANCE WITH KEY PERFORMANCE INDICATORS FOR STRATEGIC HEALTHCARE FACILITIES MAINTENANCE].

    Science.gov (United States)

    Sjekavica, Mariela; Haller, Herman; Cerić, Anita

    2015-01-01

    Building usage is the phase in the building life cycle that is most time-consuming, most functional, most significant due to building purpose and often systematically ignored. Maintenance is the set of activities that ensure the planned duration of facility exploitation phase in accordance with the requirements for quality maintenance of a large number of important building features as well as other elements immanent to the nature of facilities' life. The aim of the study is to show the analysis of the current state of organized, planned and comprehensive managerial approach in hospital utilization and maintenance in the Republic of Croatia, given on the case study of Clinical hospital center in Rijeka. The methodology used consists of relevant literature section of theory of facility utilization, maintenance and management in general, hospital buildings especially, display of practice on case study, and comparison of key performance indicators values obtained through interview with those that author Igal M. Shohet defined in his study by field surveys and statistical analyses. Despite many positive indicators of Clinical hospital center Rijeka maintenance, an additional research is needed in order to define a more complete national hospital maintenance strategy.

  12. Phosphorylation of Minichromosome Maintenance 3 (MCM3) by Checkpoint Kinase 1 (Chk1) Negatively Regulates DNA Replication and Checkpoint Activation.

    Science.gov (United States)

    Han, Xiangzi; Mayca Pozo, Franklin; Wisotsky, Jacob N; Wang, Benlian; Jacobberger, James W; Zhang, Youwei

    2015-05-08

    Mechanisms controlling DNA replication and replication checkpoint are critical for the maintenance of genome stability and the prevention or treatment of human cancers. Checkpoint kinase 1 (Chk1) is a key effector protein kinase that regulates the DNA damage response and replication checkpoint. The heterohexameric minichromosome maintenance (MCM) complex is the core component of mammalian DNA helicase and has been implicated in replication checkpoint activation. Here we report that Chk1 phosphorylates the MCM3 subunit of the MCM complex at Ser-205 under normal growth conditions. Mutating the Ser-205 of MCM3 to Ala increased the length of DNA replication track and shortened the S phase duration, indicating that Ser-205 phosphorylation negatively controls normal DNA replication. Upon replicative stress treatment, the inhibitory phosphorylation of MCM3 at Ser-205 was reduced, and this reduction was accompanied with the generation of single strand DNA, the key platform for ataxia telangiectasia mutated and Rad3-related (ATR) activation. As a result, the replication checkpoint is activated. Together, these data provide significant insights into the regulation of both normal DNA replication and replication checkpoint activation through the novel phosphorylation of MCM3 by Chk1. © 2015 by The American Society for Biochemistry and Molecular Biology, Inc.

  13. With a re-engineering of maintenance to a profitably oriented maintenance

    International Nuclear Information System (INIS)

    Angelevska, Silvana; Jolevski, Tome

    2000-01-01

    This paper presents an overview of effectiveness of the profit centered maintenance as a contemporary way of the maintenance management concept. Such redesign of a maintenance procedure results in significant gains in cost reduction and increase of the profitability and competitiveness of energy. The business process re engineering - a modern management control theory that is important aspect of the profit centered maintenance is summarized

  14. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  15. Annual report on surveillance and maintenance activities at Oak Ridge National Laboratory, Oak Ridge, Tennessee, fiscal year 1996

    International Nuclear Information System (INIS)

    1996-11-01

    In fiscal year (FY) 1995, the sites and facilities from both the Remedial Action (RA) and Decontamination and Decommissioning (D and D) programs were combined to form the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program. Surveillance and Maintenance activities were conducted throughout FY 1996 at the RA facilities. Overall, the RA S and M Program consists of approximately 650 acres that include 14 waste area groupings with approximately 200 sites. These sites include 46 major facilities, several leak and contaminated soil sites, 38 inactive tanks, approximately 50 environmental study areas and approximately 2,973 wells and boreholes. Site inspections were conducted at established frequencies on appropriate sites in the RA S and M Program in accordance with the established S and M FY 1996 Incentive Task Order (ITO)

  16. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  17. AIRCRAFT MAINTENANCE HANGAR

    Directory of Open Access Journals (Sweden)

    GEAMBASU Gabriel George

    2017-05-01

    Full Text Available The paper presents the maintenance process that is done on an airplane, at a certain period of time, or after a number of flight hours or cycles and describes the checks performed behind each inspection. The first part of research describes the aircraft maintenance process that has to be done after an updated maintenance manual according with aircraft type, followed by a short introduction about maintenance hangar. The second part of the paper presents a hangar design with a foldable roof and walls, which can be folded or extended, over an airplane when a maintenance process is done, or depending on weather condition.

  18. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  19. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  20. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  1. Building Maintenance. Student Learning Guide.

    Science.gov (United States)

    Palm Beach County Board of Public Instruction, West Palm Beach, FL.

    This student learning guide contains one module for completing a course in building maintenance. It is designed especially for use in secondary schools in Palm Beach County, Florida. The module covers one task, and consists of a purpose, performance objective, enabling objectives, learning activities keyed to resources, information sheets, student…

  2. Reliability centered Maintenance (RCM) program for Chashma NPP (CHASNUPP)

    International Nuclear Information System (INIS)

    Khalid, S.; Khan, S.A.

    2000-01-01

    This paper describes the proposed Reliability Centered Maintenance (RCM) program for Chashma Nuclear Power Plant (CHASNUPP). Major steps are the identification of risk critical components and the implementation of RCM procedures. Identification of risk critical components is based upon the CHASNUPP level 1 PSA results (performed under IAEA TC Project PAK/9/019) which is near completion. The other requirements for implementation of RCM program is the qualitative analysis to be performed for identifying the dominant potential failure modes of each risk critical component and determination of the necessary maintenance activities, required to ensure reliable operation of the identified risk critical components. Implementation of RCM program for these components will lead to improvement in plant availability and safety together with reduction in the maintenance cost. Development - implementation of RCM program at this stage will help the CHASNUPP Maintenance department who is now developing the maintenance program - procedures for CHASNUPP. (author)

  3. Maintenance features of the Compact Ignition Tokamak fusion reactor

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Hager, E.R.

    1987-01-01

    The Compact Ignition Tokamak (CIT) is envisaged to be the next experimental machine in the US Fusion Program. Its use of deuterium/tritium fuel requires the implementation of remote handling technology for maintenance and disassembly operations. The reactor is surrounded by a close-proximity nuclear shield which is designed to permit personnel access within the test cell, one day after shutdown. With the shield in place, certain maintenance activities in the cell may be done hands-on. Maintenance on the reactor is accomplished remotely using a boom-mounted manipulator after disassembling the shield. Maintenance within the plasma chamber is accomplished with two articulated boom manipulators that are capable of operating in a vacuum environment. They are stored in a vacuum enclosure behind movable shield plugs

  4. Maintenance of BWR control rod drive mechanisms

    International Nuclear Information System (INIS)

    Greene, R.H.

    1991-01-01

    Control rod drive mechanism (CRDM) replacement and rebuilding is one of the highest dose, most physically demanding, and complicated maintenance activities routinely accomplished by BWR utilities. A recent industry workshop sponsored by the Oak Ridge National Laboratory, which dealt with the effects of CRDM aging, revealed enhancements in maintenance techniques and tooling which have reduced ALARA, improved worker comfort and productivity, and have provided revised guidelines for CRDM changeout selection. Highlights of this workshop and ongoing research on CRDM aging are presented in this paper

  5. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  6. 78 FR 26383 - Environmental Assessment of the Proposed Increase in Operation, Maintenance and Replacement...

    Science.gov (United States)

    2013-05-06

    ... Proposed Increase in Operation, Maintenance and Replacement Activities Associated With the Wasatch County... of potential impacts associated with a proposed change in Operation, Maintenance and Replacement..., Maintenance, and Replacement Proposed Action includes: stabilizing canal banks; lining, piping, or enclosing...

  7. Fatty acid oxidation is required for active and quiescent brown adipose tissue maintenance and thermogenic programing.

    Science.gov (United States)

    Gonzalez-Hurtado, Elsie; Lee, Jieun; Choi, Joseph; Wolfgang, Michael J

    2018-01-01

    To determine the role of fatty acid oxidation on the cellular, molecular, and physiologic response of brown adipose tissue to disparate paradigms of chronic thermogenic stimulation. Mice with an adipose-specific loss of Carnitine Palmitoyltransferase 2 (Cpt2 A-/- ), that lack mitochondrial long chain fatty acid β-oxidation, were subjected to environmental and pharmacologic interventions known to promote thermogenic programming in adipose tissue. Chronic administration of β3-adrenergic (CL-316243) or thyroid hormone (GC-1) agonists induced a loss of BAT morphology and UCP1 expression in Cpt2 A-/- mice. Fatty acid oxidation was also required for the browning of white adipose tissue (WAT) and the induction of UCP1 in WAT. In contrast, chronic cold (15 °C) stimulation induced UCP1 and thermogenic programming in both control and Cpt2 A-/- adipose tissue albeit to a lesser extent in Cpt2 A-/- mice. However, thermoneutral housing also induced the loss of UCP1 and BAT morphology in Cpt2 A-/- mice. Therefore, adipose fatty acid oxidation is required for both the acute agonist-induced activation of BAT and the maintenance of quiescent BAT. Consistent with this data, Cpt2 A-/- BAT exhibited increased macrophage infiltration, inflammation and fibrosis irrespective of BAT activation. Finally, obese Cpt2 A-/- mice housed at thermoneutrality exhibited a loss of interscapular BAT and were refractory to β3-adrenergic-induced energy expenditure and weight loss. Mitochondrial long chain fatty acid β-oxidation is critical for the maintenance of the brown adipocyte phenotype both during times of activation and quiescence. Copyright © 2017 The Authors. Published by Elsevier GmbH.. All rights reserved.

  8. Effects of dairy intake on weight maintenance

    Directory of Open Access Journals (Sweden)

    Sun Xiaocun

    2008-10-01

    Full Text Available Abstract Background To compare the effects of low versus recommended levels of dairy intake on weight maintenance and body composition subsequent to weight loss. Design and Methods Two site (University of Kansas-KU; University of Tennessee-UT, 9 month, randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d diets for the maintenance phase. Three hundred thirty eight men and women, age: 40.3 ± 7.0 years and BMI: 34.5 ± 3.1, were randomized; Change in weight and body composition (total fat, trunk fat from 4 to 9 months were the primary outcomes. Blood chemistry, blood pressure, resting metabolism, and respiratory quotient were secondary outcomes. Energy intake, calcium intake, dairy intake, and physical activity were measured as process evaluation. Results During weight maintenance, there were no overall significant differences for weight or body composition between the low and recommended dairy groups. A significant site interaction occurred with the low dairy group at KU maintaining weight and body composition and the low dairy group at UT increasing weight and body fat. The recommended dairy group exhibited reductions in plasma 1,25-(OH2-D while no change was observed in the low dairy group. No other differences were found for blood chemistry, blood pressure or physical activity between low and recommended dairy groups. The recommended dairy group showed significantly greater energy intake and lower respiratory quotient compared to the low dairy group. Conclusion Weight maintenance was similar for low and recommended dairy groups. The recommended dairy group exhibited evidence of greater fat oxidation and was able to consume greater energy without greater weight gain compared to the low dairy group. Recommended levels of dairy products may be used during weight maintenance without contributing to weight gain compared to diets low

  9. Competence within Maintenance

    OpenAIRE

    Nerland, Annette Smørholm

    2010-01-01

    Maintenance can be a contributing factor to unwanted events, as well as desired events and states. Human competence can be defined as the ability to perform a specific task, action or function successfully, and is therefore a key factor to proper execution of maintenance tasks. Hence,maintenance will have negative consequences if done wrong, and give positive results when done right. The purpose of this report is to study the many aspects of maintenance competence. Endeavoring to improve ...

  10. Application of data mining in a maintenance system for failure prediction

    OpenAIRE

    Bastos, Pedro; Lopes, Isabel; Pires, L.C.M.

    2014-01-01

    In industrial environment, data generated during equipment maintenance and monitoring activities has become increasingly overwhelming. Data mining presents an opportunity to increase significantly the rate at which the volume of data can be turned into useful information. This paper presents an architecture designed to gather data generated in industrial units on their maintenance activities, and to forecast future failures based on data analysis. Rapid Miner is used to apply diff...

  11. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  12. Cernavoda NPP risk - Based test and maintenance planning - Methodology development

    International Nuclear Information System (INIS)

    Georgescu, G.; Popa, P.; Petrescu, A.; Naum, M.; Gutu, M.

    1997-01-01

    The Cernavoda Power Plant starts the commercial operation in November 1996. During operation of the nuclear power plant, several mandatory tests and maintenance are performed on stand-by safety system components to ensure their availability in case of accident. The basic purpose of such activities is the early detection of any failure and degradation, and timely correction of deteriorations. Because of the large number of such activities, emphasis on plant safety and allocation of resources becomes difficult. The probabilistic model and methodology can be effectively used to obtain the risk significance of these activities so that the resources are directed to the most important areas. The proposed Research Contract activity is strongly connected with other safety related areas under development. Since, the Cernavoda Probabilistic Safety Evaluation Level 1 PSA Study (CPSE) was performed and now the study is revised taking into account the as-built information, it is recommended to implement into the model the necessary modeling features to support further PSA application, especially related to Test and Maintenance optimization. Methods need to be developed in order to apply the PSA model including risk information together with other needed information for Test and Maintenance optimization. Also, in parallel with the CPSE study updating, the software interface for the PSA model is under development (Risk Monitor Software class), methods and models needing to be developed for the purpose of using it for qualified monitoring of Test and Maintenance Strategy efficiency. Similar, the Data Collection System need to be appropriate for the purpose of an ongoing implementation of a risk - based Test and Maintenance Strategy. (author). 4 refs, 1 fig

  13. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  14. Contextual assessment of maintenance culture at Olkiluoto and Forsmark

    Energy Technology Data Exchange (ETDEWEB)

    Reiman, T.; Oedewald, P. [VTT Industrial Systems (Finland); Rollenhagen, C.; Eriksson, I. [Maelardalen University (Sweden)

    2004-04-01

    The study aims to characterise, assess and develop the organisational cultures of participating nuclear power companies' maintenance units. The assessment is made by the means of maintenance core task modelling that has already been started in previous studies. The theoretical core task model is used in evaluating the characteristics of the organisational culture. We aim to identify what are the strengths and weaknesses of the case organisation's culture in relation to its core task. The study also aims to validate the methodology for contextual assessment of organisational culture. In addition to case specific results, the study acts as a benchmark between the participating companies and gives a chance to compare the different culture profiles between the companies. Similarities and differences between the organisational cultures at the maintenance units were identified. The purpose is not however to evaluate which organisation is better, but to raise issues that require attention at the organisations. When evaluative statements are made, the criteria are formed on the basis of the core task model: Even though the practices differ, from the perspective of the maintenance core task they might both be as effective. (au)

  15. Contextual assessment of maintenance culture at Olkiluoto and Forsmark

    International Nuclear Information System (INIS)

    Reiman, T.; Oedewald, P.; Rollenhagen, C.; Eriksson, I.

    2004-04-01

    The study aims to characterise, assess and develop the organisational cultures of participating nuclear power companies' maintenance units. The assessment is made by the means of maintenance core task modelling that has already been started in previous studies. The theoretical core task model is used in evaluating the characteristics of the organisational culture. We aim to identify what are the strengths and weaknesses of the case organisation's culture in relation to its core task. The study also aims to validate the methodology for contextual assessment of organisational culture. In addition to case specific results, the study acts as a benchmark between the participating companies and gives a chance to compare the different culture profiles between the companies. Similarities and differences between the organisational cultures at the maintenance units were identified. The purpose is not however to evaluate which organisation is better, but to raise issues that require attention at the organisations. When evaluative statements are made, the criteria are formed on the basis of the core task model: Even though the practices differ, from the perspective of the maintenance core task they might both be as effective. (au)

  16. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  17. Monitoring plan and maintenance NPP the Vandellos I and future prospects

    International Nuclear Information System (INIS)

    Margalef Escoda, S.

    2013-01-01

    This paper intends to give to know the singularities of an installation phase of latency and your monitoring and maintenance plan. the horizons that has the installation medium-term to guide the future dismantling level 3 monitoring and maintenance activities are also described.

  18. Scheduling a maintenance activity under skills constraints to minimize total weighted tardiness and late tasks

    Directory of Open Access Journals (Sweden)

    Djalal Hedjazi

    2015-04-01

    Full Text Available Skill management is a key factor in improving effectiveness of industrial companies, notably their maintenance services. The problem considered in this paper concerns scheduling of maintenance tasks under resource (maintenance teams constraints. This problem is generally known as unrelated parallel machine scheduling. We consider the problem with a both objectives of minimizing total weighted tardiness (TWT and number of tardiness tasks. Our interest is focused particularly on solving this problem under skill constraints, which each resource has a skill level. So, we propose a new efficient heuristic to obtain an approximate solution for this NP-hard problem and demonstrate his effectiveness through computational experiments. This heuristic is designed for implementation in a static maintenance scheduling problem (with unequal release dates, processing times and resource skills, while minimizing objective functions aforementioned.

  19. Proposal of challenges in sociology of maintenance. The role of mass media in the society dependent on technologies

    International Nuclear Information System (INIS)

    Hattori, Shigeo

    2009-01-01

    'Sociology of Maintenance' is a very unique field of activity in the JSM compared to the other academic organizations. Since the JSM is dealing with maintenance activities of people on large scale infra-systems, it is necessary to study and to systematically clarify the interface/interaction between the maintenance activities and related society. In this session, the recent discussions in the Sociology of Maintenance Workshop in JSM on the nature of special atmosphere surrounding nuclear power maintenance and influence of mass media on the atmosphere are discussed by showing actual examples of the course of accident/affair. (author)

  20. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  1. Some problems of maintenance regulation at Ukrainian nuclear power plants

    International Nuclear Information System (INIS)

    Koltakov, V.

    1997-01-01

    Among all the possible problems arising in a connection with provision of NPP power units safe operation, the maintenance and repair at the Ukrainian NPPs possess an important place. System of maintenance and repair at the Ukrainian NPPs is presently still traditional one, based on the former USSR' document ''Rules of the NPPs Equipment Maintenance and Repair Arrangement'' (RD.53.025.002-088). For to provide technical systems reliability and safety in an accordance with ''General Provisions on NPP Safety'' (OPB-82) (presently OPB-95 is in underway in Ukraine) nuclear operators are implementing their maintenance and repair. These procedures are obligatory conditions for NPP operation during all the life term. To implement an equipment maintenance and repair there are appropriate divisions in NPP structure envisaged such as departments, laboratories, sections, shops, etc. composing an NPP maintenance and repair service. There are also another specific enterprises engaged in such activities. (author). 2 tabs, 4 diagrams

  2. Effectiveness of physical activity interventions in achieving behaviour change maintenance in young and middle aged adults: A systematic review and meta-analysis.

    Science.gov (United States)

    Murray, Jennifer M; Brennan, Sarah F; French, David P; Patterson, Christopher C; Kee, Frank; Hunter, Ruth F

    2017-11-01

    Physical activity (PA) interventions are generally effective in supporting short-term behaviour change, but increases are not always maintained. This review examined the effectiveness of PA interventions for behaviour change maintenance in young and middle-aged adults, and investigated which Behaviour Change Techniques (BCTs) and other intervention features were associated with maintenance. Six databases (Medline, EMBASE, PsycINFO, Cochrane Database of Systematic Reviews, CINAHL, Web of Science) were systematically searched. Eligibility criteria were controlled trials investigating the effectiveness of PA interventions with adult (mean age 18-64 years) non-clinical populations using validated measures of PA behaviour at baseline and ≥six months' post-baseline. Results were pooled in meta-analyses using standardised mean differences (SMD) at five time intervals (6-9, 9-15, 15-21, 21-24, >24 months). Moderator analyses investigated the influence of sample and intervention characteristics on PA maintenance at 6-9 months. Sixty-two studies were included. PA interventions had a significant effect on behaviour maintenance 6-15 months post-baseline relative to controls. Interventions had a larger effect on maintenance at 6-9 months (SMD = 0.28; 95% CI: 0.20, 0.35; I 2  = 73%) compared to 9-15 months (SMD = 0.20; 95% CI: 0.13, 0.26; I 2  = 70%). Beyond 15 months, PA measurements were infrequent with little evidence supporting maintenance. Moderator analyses showed some BCTs and intervention settings moderated PA outcomes at 6-9 months. A multivariable meta-regression model showed interventions using the BCTs 'Prompt self-monitoring of behavioural outcome' (b = 1.46, p behaviour to 15 months. Greater consideration must be given to how future interventions encourage and measure maintenance of changes, and investigate broader psychological, social and environmental influences of PA behaviour. PROSPERO 2015:CRD42015025462. Copyright © 2017 Elsevier Ltd. All

  3. Olfactory short-term memory encoding and maintenance - an event-related potential study.

    Science.gov (United States)

    Lenk, Steffen; Bluschke, Annet; Beste, Christian; Iannilli, Emilia; Rößner, Veit; Hummel, Thomas; Bender, Stephan

    2014-09-01

    This study examined whether the memory encoding and short term maintenance of olfactory stimuli is associated with neurophysiological activation patterns which parallel those described for sensory modalities such as vision and auditory. We examined olfactory event-related potentials in an olfactory change detection task in twenty-four healthy adults and compared the measured activation to that found during passive olfactory stimulation. During the early olfactory post-processing phase, we found a sustained negativity over bilateral frontotemporal areas in the passive perception condition which was enhanced in the active memory task. There was no significant lateralization in either experimental condition. During the maintenance interval at the end of the delay period, we still found sustained activation over bilateral frontotemporal areas which was more negative in trials with correct - as compared to incorrect - behavioural responses. This was complemented by a general significantly stronger frontocentral activation. Summarizing, we were able to show that olfactory short term memory involves a parallel sequence of activation as found in other sensory modalities. In addition to olfactory-specific frontotemporal activations in the memory encoding phase, we found slow cortical potentials over frontocentral areas during the memory maintenance phase indicating the activation of a supramodal memory maintenance system. These findings could represent the neurophysiological underpinning of the 'olfactory flacon', the olfactory counter-part to the visual sketchpad and phonological loop embedded in Baddeley's working memory model. Copyright © 2014 Elsevier Inc. All rights reserved.

  4. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  5. Transfer of technology in maintenance tools

    International Nuclear Information System (INIS)

    Delorme, H.; Cartry, J.P.

    1985-10-01

    For maximum reliability of maintenance operations, FRAMATOME has aimed to improve the accessibility of highly irradiated and contaminated reactor coolant system equipment by the active promotion of an automation and robotization strategy. A number of robot designs have been developed providing replacement of operators inside the steam generator channel head, smooth handling of heavy or cumbersome objects in this zone, easy marking of steam generator tubes and increased speed of repetitive channel head operations: maintenance spider, theta-theta prime robotic service arm, R-theta robotic service arm, remote manipulator arm. Two operations are described: channel head folding cover plate and, operation of the torquing machine for head cover plate

  6. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  7. A genetic algorithm solution for a nuclear power plant risk-cost maintenance model

    International Nuclear Information System (INIS)

    Tong Jiejuan; Mao Dingyuan; Xue Dazhi

    2004-01-01

    Reliability Centered Maintenance (RCM) is one of the popular maintenance optimization methods according to certain kinds of priorities. Traditional RCM usually analyzes and optimizes the maintenance strategy from the viewpoint of component instead of the whole maintenance program impact. Research presented in this paper is a pilot study using PSA techniques in RCM. How to reflect the effect on component unavailability by the maintenance activities such as surveillance testing and preventive maintenance in PSA model is discussed firstly. Based on the discussion, a maintenance risk-cost model is established for global maintenance optimization in a nuclear power plant, and a genetic algorithm (GA) is applied to solve such a model to get the global optimized maintenance strategy. Finally, the result got from a simple test case based on a risk-cost model consisting of 10 components is presented

  8. Maintenance Production Demand and Capacity Analysis of Third Maintenance Battalion

    Science.gov (United States)

    2017-12-01

    Delivery T/E Table of Equipment TFSMS Total Force Structure Management System TFSP Total Force Structure Process TM Technical Manual T/O Table of...exercises each year, both on Okinawa and throughout the Pacific theater. When equipment requires maintenance beyond the organizational -level...demand was analyzed based on customer cycle time (i.e., time that equipment was in Third Maintenance Battalion custody), maintenance cycle time during

  9. A Novel Short-Term Maintenance Strategy for Power Transmission and Transformation Equipment Based on Risk-Cost-Analysis

    Directory of Open Access Journals (Sweden)

    Hang Yang

    2017-11-01

    Full Text Available Current studies on preventive condition-based maintenance of power transmission and transformation equipment mainly focus on mid-term or long-term maintenance, and cannot meet the requirements of short-term especially temporary maintenance. In order to solve the defects of the present preventive maintenance strategies, according to the engineering application and based on risk-cost analysis, a short-term maintenance strategy is proposed in this manuscript. For the equipment working in bad health condition, its active maintenance costs and operation risk costs are evaluated, respectively. Then the latest maintenance time is calculated in accordance with the principle that its operation risk costs are no higher than active maintenance costs. Utilizing the latest maintenance time, the best maintenance time is calculated by setting the maximum relative earnings of postponing maintenance as the target, which provides the operation staffs with comprehensive maintenance-decision support. In the end, different cases on the IEEE 24-bus system are simulated. The effectiveness and advantages of the proposed strategy are demonstrated by the simulation results.

  10. A Situational Maintenance Model

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance.......An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance....

  11. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    Science.gov (United States)

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  12. Maintenance-Ready Web Application Development

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the subject of developing maintenance-ready web applications. Maintenance is presented as a core stage in a web application’s lifecycle. The concept of maintenance-ready is defined in the context of web application development. Web application maintenance tasks types are enunciated and suitable task types are identified for further analysis. The research hypothesis is formulated based on a direct link between tackling maintenance in the development stage and reducing overall maintenance costs. A live maintenance-ready web application is presented and maintenance related aspects are highlighted. The web application’s features, that render it maintenance-ready, are emphasize. The cost of designing and building the web-application to be maintenance-ready are disclosed. The savings in maintenance development effort facilitated by maintenance ready features are also disclosed. Maintenance data is collected from 40 projects implemented by a web development company. Homogeneity and diversity of collected data is evaluated. A data sample is presented and the size and comprehensive nature of the entire dataset is depicted. Research hypothesis are validated and conclusions are formulated on the topic of developing maintenance-ready web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  13. Marginal costs for road maintenance and operation - a cost function approach

    OpenAIRE

    Haraldsson, Mattias

    2007-01-01

    Using observational data covering the whole Swedish national road network for the period 1998-2002, this paper estimates a set of maintenance and operation cost functions. It is found that costs for all operation and maintenance measures increase with traffic intensity, with two exceptions; total operation and winter operation measures are fixed cost activities. All other operation and maintenance measures have short run elasticities in the range 0.25-0.60. The impact of an additional vehicle...

  14. Cocaine users with comorbid Cluster B personality disorders show dysfunctional brain activation and connectivity in the emotional regulation networks during negative emotion maintenance and reappraisal.

    Science.gov (United States)

    Albein-Urios, Natalia; Verdejo-Román, Juan; Soriano-Mas, Carles; Asensio, Samuel; Martínez-González, José Miguel; Verdejo-García, Antonio

    2013-12-01

    Cocaine dependence often co-occurs with Cluster B personality disorders. Since both disorders are characterized by emotion regulation deficits, we predicted that cocaine comorbid patients would exhibit dysfunctional patterns of brain activation and connectivity during reappraisal of negative emotions. We recruited 18 cocaine users with comorbid Cluster B personality disorders, 17 cocaine users without comorbidities and 21 controls to be scanned using functional magnetic resonance imaging (fMRI) during performance on a reappraisal task in which they had to maintain or suppress the emotions induced by negative affective stimuli. We followed region of interest (ROI) and whole-brain approaches to investigate brain activations and connectivity associated with negative emotion experience and reappraisal. Results showed that cocaine users with comorbid personality disorders had reduced activation of the subgenual anterior cingulate cortex during negative emotion maintenance and increased activation of the lateral orbitofrontal cortex and the amygdala during reappraisal. Amygdala activation correlated with impulsivity and antisocial beliefs in the comorbid group. Connectivity analyses showed that in the cocaine comorbid group the subgenual cingulate was less efficiently connected with the amygdala and the fusiform gyri and more efficiently connected with the anterior insula during maintenance, whereas during reappraisal the left orbitofrontal cortex was more efficiently connected with the amygdala and the right orbitofrontal cortex was less efficiently connected with the dorsal striatum. We conclude that cocaine users with comorbid Cluster B personality disorders have distinctive patterns of brain activation and connectivity during maintenance and reappraisal of negative emotions, which correlate with impulsivity and dysfunctional beliefs. Copyright © 2013 Elsevier B.V. and ECNP. All rights reserved.

  15. The Nordic Maintenance Care Program – An interview study on the use of maintenance care in a selected group of Danish chiropractors

    Directory of Open Access Journals (Sweden)

    Leboeuf-Yde Charlotte

    2009-06-01

    Full Text Available Abstract Background Although maintenance care appears to be relatively commonly used among chiropractors, the indications for its use are incompletely understood. A questionnaire survey was recently carried out among Swedish chiropractors in order to identify their choice of various management strategies, including maintenance care. That study revealed a common pattern of choice of strategies. However, it would be necessary to verify these findings in another study population and to obtain some additional information best collected through an interview. Objectives The main aim of the present study was to attempt to reproduce the findings in the Swedish study and to obtain more information on the use of maintenance care. Method A group of 11 chiropractors were selected because they used maintenance care. They were interviewed using the questionnaire from the previous Swedish survey. The questionnaire consisted of a simple description of a hypothetical patient with low back pain and nine possible ways in which the case could develop ("scenarios". They could choose between six different management strategies for each scenario. In addition, the chiropractors were encouraged to provide their own definition of maintenance care in an open-ended question. Interviews were taped, transcribed and analyzed. For the open-ended question, statements were identified relating to six pre hoc defined topics on the inclusion criteria/rationale for maintenance care, the frequency of treatments, and the duration of the maintenance care program. Results The open-ended question revealed that in patients with low back pain, maintenance care appears to be offered to prevent new events. The rationale was to obtain optimal spinal function. There appears to be no common convention on the frequency of treatments and duration of the treatment program was not mentioned by any of the interviewees. Conclusion The results from the questionnaire in the Danish survey showed that

  16. People's response to the promotion of the effective use of nuclear power plants. From the viewpoint of favoring providing information about maintenance activities

    International Nuclear Information System (INIS)

    Sakai, Yukimi; Ueda, Yoshitaka; Goto, Manabu

    2010-01-01

    In order to elucidate people's response to the promotion of the effective use of nuclear power plants by high-reliability maintenance, we conducted a questionnaire survey targeting 306 respondents living in the cities of Kyoto, Osaka and Kobe. The questionnaire comprises information about maintenance contents and regulatory system concerning extension of plant operation cycle, long life operation, and plant power-up, not as a measure for safety but a measure for promoting effective use of power plants. It was found that a high number of respondents held a positive attitude towards the promotion of the effective use of plants, even if they tend to be anxious about safety problems. Moreover, the study suggests that no enhance the feeling of safety, information about maintenance activities and regulatory system was more effective than information about actual technical possibility. (author)

  17. Fatty acid oxidation is required for active and quiescent brown adipose tissue maintenance and thermogenic programing

    Directory of Open Access Journals (Sweden)

    Elsie Gonzalez-Hurtado

    2018-01-01

    Full Text Available Objective: To determine the role of fatty acid oxidation on the cellular, molecular, and physiologic response of brown adipose tissue to disparate paradigms of chronic thermogenic stimulation. Methods: Mice with an adipose-specific loss of Carnitine Palmitoyltransferase 2 (Cpt2A−/−, that lack mitochondrial long chain fatty acid β-oxidation, were subjected to environmental and pharmacologic interventions known to promote thermogenic programming in adipose tissue. Results: Chronic administration of β3-adrenergic (CL-316243 or thyroid hormone (GC-1 agonists induced a loss of BAT morphology and UCP1 expression in Cpt2A−/− mice. Fatty acid oxidation was also required for the browning of white adipose tissue (WAT and the induction of UCP1 in WAT. In contrast, chronic cold (15 °C stimulation induced UCP1 and thermogenic programming in both control and Cpt2A−/− adipose tissue albeit to a lesser extent in Cpt2A−/− mice. However, thermoneutral housing also induced the loss of UCP1 and BAT morphology in Cpt2A−/− mice. Therefore, adipose fatty acid oxidation is required for both the acute agonist-induced activation of BAT and the maintenance of quiescent BAT. Consistent with this data, Cpt2A−/− BAT exhibited increased macrophage infiltration, inflammation and fibrosis irrespective of BAT activation. Finally, obese Cpt2A−/− mice housed at thermoneutrality exhibited a loss of interscapular BAT and were refractory to β3-adrenergic-induced energy expenditure and weight loss. Conclusion: Mitochondrial long chain fatty acid β-oxidation is critical for the maintenance of the brown adipocyte phenotype both during times of activation and quiescence. Keywords: Fatty acid oxidation, Brown adipose tissue, Cold induced thermogenesis, Adrenergic signaling, Adipose macrophage

  18. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  19. Telomeres and viruses: common themes of genome maintenance

    Science.gov (United States)

    Deng, Zhong; Wang, Zhuo; Lieberman, Paul M.

    2012-01-01

    Genome maintenance mechanisms actively suppress genetic instability associated with cancer and aging. Some viruses provoke genetic instability by subverting the host’s control of genome maintenance. Viruses have their own specialized strategies for genome maintenance, which can mimic and modify host cell processes. Here, we review some of the common features of genome maintenance utilized by viruses and host chromosomes, with a particular focus on terminal repeat (TR) elements. The TRs of cellular chromosomes, better known as telomeres, have well-established roles in cellular chromosome stability. Cellular telomeres are themselves maintained by viral-like mechanisms, including self-propagation by reverse transcription, recombination, and retrotransposition. Viral TR elements, like cellular telomeres, are essential for viral genome stability and propagation. We review the structure and function of viral repeat elements and discuss how they may share telomere-like structures and genome protection functions. We consider how viral infections modulate telomere regulatory factors for viral repurposing and can alter normal host telomere structure and chromosome stability. Understanding the common strategies of viral and cellular genome maintenance may provide new insights into viral–host interactions and the mechanisms driving genetic instability in cancer. PMID:23293769

  20. Transport package maintenance requirements and operations

    International Nuclear Information System (INIS)

    Tyacke, M.J.; Ball, L.J.; Ayers, A.L. Jr.; Hayes, G.R.; Anselmo, A.A.

    1988-01-01

    The NuPac 125-B rail cask, which transports the damaged core debris from Three Mile Island Unit 2 (TMI-2) to the Idaho National Engineering Laboratory (INEL), is the only new spent-fuel rail shipping cask to be licensed in the United States within the last decade. EG ampersand G Idaho, Inc. (EG ampersand G), acting on behalf of the US Department of Energy, is responsible for ensuring that those new casks and rail cars are properly maintained per regulatory requirements. Both the casks and rail cars have comprehensive in-service inspection and preventive maintenance programs, which are more involved than implied by the requirements. The TMI-2 shipping campaign is the most ambitious spent-fuel transport activity being conducted in the nuclear industry. The experience gained in this campaign, as it relates to maintenance of a transport system, should be of interest and have direct applicability to similar shipping activities planned in the years ahead

  1. Maintenance improvement program

    International Nuclear Information System (INIS)

    Derbonne, D.R.; Plunkett, T.F.; Simpson, J.R.

    1989-01-01

    During fuel cycle 1 at River Bend station, considerable effort was expended to reduce corrective maintenance work orders (MWOs) to <1,000. This was done by complementing the plant staff with costly contract personnel. Coming out of the first refueling outage, most contract personnel were released. The change in MWO backlog started a steady rise. It became readily apparent that to avoid costly contract staff time, a maintenance improvement program (MIP) was necessary. The MIP Was primarily directed at two areas: crew efficiency improvements and improved preplanned MWO packages. The overall effect of the MIP was to achieve significant productivity improvements with reduced operation and maintenance cost by providing frequent accountability to all levels of maintenance supervision. The MIP also produced a feeling of pride among the maintenance department employees that had not really existed before. This was the best benefit of all

  2. Incarcerated intravenous heroin users: predictors of post-release utilization of methadone maintenance treatment.

    Science.gov (United States)

    Lin, Huang-Chi; Wang, Peng-Wei; Yang, Yi-Hsin; Tsai, Jih-Jin; Yen, Cheng-Fang

    2016-01-01

    Incarcerated intravenous heroin users have more problematic patterns of heroin use, but are less likely to access methadone maintenance treatment by their own initiative than heroin users in the community. The present study examined predictors for receiving methadone maintenance treatment post-release among incarcerated intravenous heroin users within a 24-month period. This cohort study recruited 315 incarcerated intravenous heroin users detained in 4 prisons in southern Taiwan and followed up within the 24-month period post-release. Cox proportional hazards regression analysis was applied to determine the predictive effects of sociodemographic and drug-use characteristics, attitude toward methadone maintenance treatment, human immunodeficiency virus serostatus, perceived family support, and depression for access to methadone maintenance treatment after release. There were 295 (93.7%) incarcerated intravenous heroin users released that entered the follow-up phase of the study. During the 24-month follow-up period, 50.8% of them received methadone maintenance treatment. After controlling for the effects of the detainment period before and after recruitment by Cox proportional hazards regression analysis, incarcerated intravenous heroin users who had positive human immunodeficiency virus serostatus (HR = 2.85, 95% CI = 1.80-4.52, p maintenance treatment before committal (HR = 1.94, 95% CI = 1.23-3.05, p maintenance treatment within the 24-month follow-up period. Positive human immunodeficiency virus serostatus with fully subsidized treatment and previous methadone maintenance treatment experiences predicted access of methadone maintenance treatment post-release. Strategies for getting familiar with methadone maintenance treatment during detainment, including providing methadone maintenance treatment prior to release and lowering the economic burden of receiving treatment, may facilitate entry of methadone maintenance treatment for incarcerated intravenous heroin

  3. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  4. Development of preventive maintenance technology and advanced service equipment for operating nuclear power plants

    International Nuclear Information System (INIS)

    Abe, Kazuhiro; Sumikawa, Masaharu; Hirakawa, Hiromasa; Arakawa, Tadao; Hasegawa, Kunio; Kato, Kanji.

    1990-01-01

    Hitachi Ltd. as a manufacturer of nuclear power plants has carried out the consistent general preventive maintenance activities from the planning of the plants and the design of maintainability in the construction phase to the planning and working of preventive maintenance in the operation and maintenance phase, and exerted efforts to heighten the capacity ratio and reliability of the plants. For the purpose, the steady activities of reliability improvement have been carried out throughout the whole company, and the rationalization of the planning and management of the preventive maintenance with a computer and the development of the robots to which Al is applied have been promoted. As the technology of upgrading the facilities, boron racks, the control rods having long life and so on were developed, and their practical use is advanced. Moreover for the future, the development of the diagnostic technology on material deterioration using superconductive quantum interference devices (SQUID) is in progress. The preventive maintenance activities in Hitachi Ltd., the technical development for the purpose and the upgrading of the plant facilities are reported. (K.I.)

  5. Reliability Centered Maintenance as a tool for plant life extension

    International Nuclear Information System (INIS)

    Elliott, J.O.; Mulay, J.N.; Nakahara, Y.

    1991-01-01

    Currently in the nuclear industry there is a growing interest in lowering the cost and complexity of maintenance activities while at the same time improving plant reliability and safety in an effort to prepare for the technical and regulatory challenges of life extension. This seemingly difficult task is being aided by the introduction of a maintenance philosophy developed originally by the airline industry and subsequently applied with great success both in that industry and the U.S. military services. Reliability Centered Maintenance (RCM), in its basic form, may be described as a consideration of reliability and maintenance problems from a systems level approach, allowing a focus on preservation of system function as the aim of a maintenance program optimized for both safety and economics. It is this systematic view of plant maintenance, with the emphasis on overall functions rather than individual parts and components which sets RCM apart from past nuclear plant maintenance philosophies. It is also the factor which makes application of RCM an ideal first step in development of strategies for life extension, both for aging plants, and for plants just beginning their first license term. (J.P.N.)

  6. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  7. Remote handling design for moderator-reflector maintenance in JSNS

    International Nuclear Information System (INIS)

    Teshigawara, Makoto; Aizawa, Hideyuki; Harada, Masahide; Kinoshita, Hidetaka; Meigo, Shinichiro; Maekawa, Fujio; Kaminaga, Masanori; Kato, Takashi; Ikeda, Yujiro

    2005-05-01

    This report introduces the present design status of remote-handling devices for activated and used components such as moderator and reflector in a spallation neutron source of the Material and Life Science Facility (MLF) at J-PARC (Japan Proton Accelerator Research Complex). The design concept and maintenance scenario are also mentioned. A key maintenance scenario adopts that the used components should be taken out from the MLF to the other storage facility after the volume reduction of them. Almost full remote handling is available to the maintenance work except for the connection/disconnection pipes of the cooling water. Remote handling for the cooling water system is under designing and it will be prepared before being significant radiation dose by accumulation of beryllium ( 7 Be) in future. Total six remote handling devices are used for moderator-reflector maintenance. They are also available to the proton beam window and muon target maintenance. Maintenance scenario is separated into two works. One is to replace used components to new ones during beam-stop and the other is dispose used components during beam operation. Required period of replacement work is estimated to be ∼15 days, on the other hand, the disposal work is ∼26 days after dry up work (∼30 days), respectively. Study of the maintenance scenario and the remote handling design brings about the reasonable procedures and period of the maintenance work. (author)

  8. Joint optimization of production scheduling and machine group preventive maintenance

    International Nuclear Information System (INIS)

    Xiao, Lei; Song, Sanling; Chen, Xiaohui; Coit, David W.

    2016-01-01

    Joint optimization models were developed combining group preventive maintenance of a series system and production scheduling. In this paper, we propose a joint optimization model to minimize the total cost including production cost, preventive maintenance cost, minimal repair cost for unexpected failures and tardiness cost. The total cost depends on both the production process and the machine maintenance plan associated with reliability. For the problems addressed in this research, any machine unavailability leads to system downtime. Therefore, it is important to optimize the preventive maintenance of machines because their performance impacts the collective production processing associated with all machines. Too lengthy preventive maintenance intervals may be associated with low scheduled machine maintenance cost, but may incur expensive costs for unplanned failure due to low machine reliability. Alternatively, too frequent preventive maintenance activities may achieve the desired high reliability machines, but unacceptably high scheduled maintenance cost. Additionally, product scheduling plans affect tardiness and maintenance cost. Two results are obtained when solving the problem; the optimal group preventive maintenance interval for machines, and the assignment of each job, including the corresponding start time and completion time. To solve this non-deterministic polynomial-time problem, random keys genetic algorithms are used, and a numerical example is solved to illustrate the proposed model. - Highlights: • Group preventive maintenance (PM) planning and production scheduling are jointed. • Maintenance interval and assignment of jobs are decided by minimizing total cost. • Relationships among system age, PM, job processing time are quantified. • Random keys genetic algorithms (GA) are used to solve the NP-hard problem. • Random keys GA and Particle Swarm Optimization (PSO) are compared.

  9. EPR design for maintenance

    International Nuclear Information System (INIS)

    Krugmann, U.

    1998-01-01

    Preventive maintenance is very important in achieving high plant availability. For the European Pressurized Reactor (EPR) preventive maintenance has been carefully addressed in the design stage. This is particularly necessary because of the traditionally different maintenance strategies employed in France and Germany. This paper emphasizes the following features introduced in the ERP design to minimize the duration of the refueling outage: (1) containment accessibility during power operation; (2) overall plant layout to facilitate inspections and maintenances within the containment; and (3) safety system design for enabling preventive maintenance during power operation. (author)

  10. The TFTR maintenance manipulator

    International Nuclear Information System (INIS)

    Kungl, D.; Loesser, D.; Heitzenroeder, P.; Cerdan, G.

    1989-01-01

    TFTR plans to begin D-T experiments in mid 1990. The D-T experimental program will produce approximately one hundred shots, with a neutron generation rate of 10 19 neutrons per shot. This will result in high levels of activation in TFTR, especially in the vacuum vessel. The primary purpose of the Maintenance Manipulator is to provide a means of remotely performing certain defined maintenance and inspection tasks inside the vacuum torus so as to minimize personnel exposure to radiation. The manipulator consists of a six-link folding boom connected to a fixed boom on a movable carriage. The entire manipulator is housed in a vacuum antechamber connected to the vacuum torus, through a port formerly used for a vacuum pumping duct. The configuration extends 180 0 in either direction to provide complete coverage of the torus. The four 3500 l/s turbopumps which were formerly used in the pumping duct will be mounted on the antechamber. The manipulator will utilize two end effectors. The first, called a General Inspection Arm (GIA) provides a movable platform to an inspection camera and an in-vacuum leak detector. The second is a bilateral, force-reflecting pair of slave arms which utilize specially developed tools to perform several maintenance functions. All components except the slave arms are capable of operating in TFTR's vacuum environment and during 150 0 C bakeout of the torus. (orig.)

  11. Advances in safety related maintenance

    International Nuclear Information System (INIS)

    2000-03-01

    The maintenance of systems, structures and components in nuclear power plants (NPPs) plays an important role in assuring their safe and reliable operation. Worldwide, NPP maintenance managers are seeking to reduce overall maintenance costs while maintaining or improving the levels of safety and reliability. Thus, the issue of NPP maintenance is one of the most challenging aspects of nuclear power generation. There is a direct relation between safety and maintenance. While maintenance alone (apart from modifications) will not make a plant safer than its original design, deficient maintenance may result in either an increased number of transients and challenges to safety systems or reduced reliability and availability of safety systems. The confidence that NPP structures, systems and components will function as designed is ultimately based on programmes which monitor both their reliability and availability to perform their intended safety function. Because of this, approaches to monitor the effectiveness of maintenance are also necessary. An effective maintenance programme ensures that there is a balance between the improvement in component reliability to be achieved and the loss of component function due to maintenance downtime. This implies that the safety level of an NPP should not be adversely affected by maintenance performed during operation. The nuclear industry widely acknowledges the importance of maintenance in NPP safety and operation and therefore devotes great efforts to develop techniques, methods and tools to aid in maintenance planning, follow-up and optimization, and in assuring the effectiveness of maintenance

  12. The method for assurance to operational safety of cryogenics equipment through definite maintenance

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2004-01-01

    The present paper reports about a method of ensuring operational safety of cryogenics equipment through specific maintenance measures which imply a definite concept of maintainability and operational reliability, methods of maintenance, necessary logistic and necessary personnel. The stages of the concept should succeed in a logical order and must be based on detailed analyses of the process of maintenance. The method starts from the operation conditions of cryogenic equipment in nuclear regime. Thus maintenance policy must be well defined within the boundaries of the nuclear plant through definition of coherent objectives and responsibility delegation for the personnel implied in maintenance activity. This method ensures performance in maintenance and an efficient feedback from equipment analysis. (author)

  13. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs

  14. CLEAN-ROADS project: air quality considerations after the application of a novel MDSS on winter road maintenance activities

    Science.gov (United States)

    Pretto, Ilaria; Malloci, Elisa; Tonidandel, Gabriele; Benedetti, Guido; Di Napoli, Claudia; Piazza, Andrea; Apolloni, Roberto; Cavaliere, Roberto

    2016-04-01

    With this poster we present the environmental benefit on air quality derived by the application of the CLEAN-ROADS pilot project. The CLEAN-ROADS project addresses the problem of the environmental pollution caused by de-icing salts during winter road maintenance activities in the Province of Trento (Italy). A demonstrative Maintenance Decision Support System (MDSS) has been developed in order to improve the intervention procedures of the road management service. Specifically it aims to optimize the efficiency of how available resources (e.g., salt consumption) are currently used while guaranteeing the current level of road safety. The CLEAN-ROADS project has been tested and validated on a test area located in a valley bottom (Adige Valley), where the highest optimization margins are to be expected. The project supports current road maintenance practices, which has proved to be reliable and accurate, with a new scalable and energy-efficient road monitoring system. This system is based on a network of road weather stations (road weather information system, RWIS) installed on the test route. It is capable to collect real-time data about the road conditions and to perform short-term and now-cast road weather forecasts, which actively integrate weather data and bulletins covering the target area [1]. This poster presents the results obtained from a three-year monitoring activity with the aim to (1) determine the impact of de-icing salts on air quality and (2) quantify the improvements obtained by the application of the CLEAN-ROADS project on air quality. The Ambient Air Quality and Cleaner Air for Europe Directive (2008/50/EC) states that contributions to exceedances of particulate matter PM10 limit values that are attributable to road winter salting may be subtracted when assessing compliance with air quality limit values, once provided that reasonable measures have been taken to lower concentrations [2]. As the de-icing salts used in road maintenance are mainly based

  15. Behavioral Parent Training in Child Welfare: Maintenance and Booster Training

    Science.gov (United States)

    Van Camp, Carole M.; Montgomery, Jan L.; Vollmer, Timothy R.; Kosarek, Judith A.; Happe, Shawn; Burgos, Vanessa; Manzolillo, Anthony

    2008-01-01

    Previous research has demonstrated the efficacy of a 30-hr behavioral parent training program at increasing skill accuracy. However, it remains unknown whether skills acquisitions are maintained on a long-term basis. Few studies have evaluated the maintenance of skills learned during behavioral parent training for foster parents. The purpose of…

  16. Analysis and forecast of maintenance in power plants; Instandhaltungsanalyse und -prognose fuer Grosskraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Kittan, Thomas [Vattenfall Europe Generation AG, Spremberg (Germany). Standort Technischer Service; Herold, Matthias [TUEV SUED Industrie Service GmbH, Chemnitz (Germany); Baumann, Carsten [TUEV SUED Industrie Service GmbH, Dresden (Germany)

    2011-07-01

    A comprehensive assessment of the 'Schwarze Pumpe' power station has given insights into the effectiveness of maintenance measures and facilitated the budgeting of future maintenance for four additional power station units. Vattenfall commissioned experts from TUeV SUeD Industrie Service to carry out third-party analysis of its maintenance measures and forecast future maintenance budgets. The aim was to obtain a valid data set enabling the detailed assessment of past and future activities and pointing out potentials for improvement. (orig.)

  17. Tofacitinib as Induction and Maintenance Therapy for Ulcerative Colitis.

    Science.gov (United States)

    Sandborn, William J; Su, Chinyu; Sands, Bruce E; D'Haens, Geert R; Vermeire, Séverine; Schreiber, Stefan; Danese, Silvio; Feagan, Brian G; Reinisch, Walter; Niezychowski, Wojciech; Friedman, Gary; Lawendy, Nervin; Yu, Dahong; Woodworth, Deborah; Mukherjee, Arnab; Zhang, Haiying; Healey, Paul; Panés, Julian

    2017-05-04

    Tofacitinib, an oral, small-molecule Janus kinase inhibitor, was shown to have potential efficacy as induction therapy for ulcerative colitis in a phase 2 trial. We further evaluated the efficacy of tofacitinib as induction and maintenance therapy. We conducted three phase 3, randomized, double-blind, placebo-controlled trials of tofacitinib therapy in adults with ulcerative colitis. In the OCTAVE Induction 1 and 2 trials, 598 and 541 patients, respectively, who had moderately to severely active ulcerative colitis despite previous conventional therapy or therapy with a tumor necrosis factor antagonist were randomly assigned to receive induction therapy with tofacitinib (10 mg twice daily) or placebo for 8 weeks. The primary end point was remission at 8 weeks. In the OCTAVE Sustain trial, 593 patients who had a clinical response to induction therapy were randomly assigned to receive maintenance therapy with tofacitinib (either 5 mg or 10 mg twice daily) or placebo for 52 weeks. The primary end point was remission at 52 weeks. In the OCTAVE Induction 1 trial, remission at 8 weeks occurred in 18.5% of the patients in the tofacitinib group versus 8.2% in the placebo group (P=0.007); in the OCTAVE Induction 2 trial, remission occurred in 16.6% versus 3.6% (Ptofacitinib group and 40.6% in the 10-mg tofacitinib group versus 11.1% in the placebo group (Ptofacitinib than with placebo. In the OCTAVE Sustain trial, the rate of serious infection was similar across the three treatment groups, and the rates of overall infection and herpes zoster infection were higher with tofacitinib than with placebo. Across all three trials, adjudicated nonmelanoma skin cancer occurred in five patients who received tofacitinib and in one who received placebo, and adjudicated cardiovascular events occurred in five who received tofacitinib and in none who received placebo; as compared with placebo, tofacitinib was associated with increased lipid levels. In patients with moderately to severely

  18. Parameters affecting tooth loss during periodontal maintenance in a Greek population.

    Science.gov (United States)

    Tsami, Alexandra; Pepelassi, Eudoxie; Kodovazenitis, George; Komboli, Mado

    2009-09-01

    Investigators have evaluated predictive parameters of tooth loss during the maintenance phase (MP). The authors conducted a retrospective study to evaluate the rate of tooth loss and to explore the parameters that affect tooth loss during MP in a Greek population. A periodontist administered periodontal treatment and maintenance care to 280 participants with severe periodontitis for a mean period +/- standard deviation of 10.84 +/- 2.13 years. The periodontist recorded the following parameters for each participant: oral hygiene index level, simplified gingival index level, clinical attachment level, probing depth measurements, initial tooth prognosis, smoking status, tooth loss during active periodontal treatment and MP, and compliance with suggested maintenance visits. The authors found that total tooth loss during active treatment (n = 1,427) was greater than during MP (n = 918) and was associated with the initial tooth prognosis, tooth type group, participants' compliance with suggested maintenance visits, smoking status and acceptability of the quality of tooth restorations. Most of the teeth extracted during maintenance had an initial guarded prognosis (n = 612). Participants whose compliance was erratic had a greater risk of undergoing tooth extraction than did participants whose compliance was complete. Participants' initial tooth prognosis, tooth type, compliance with suggested maintenance visits and smoking status affected tooth loss during MP. Initial guarded prognosis and erratic compliance increased the risk of undergoing tooth extraction during maintenance. Determining predictive parameters for disease progression and tooth loss provides critical information to clinicians so that they can develop and implement rational treatment planning.

  19. Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-04-01

    Full Text Available This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.

  20. IAEA programme on maintenance of nuclear instruments

    International Nuclear Information System (INIS)

    Vuister, P.H.

    1986-01-01

    The Medical Applications Section in the Division of Life Sciences of the International Atomic Energy Agency has been engaged since 1975 in activities aimed at the more effective use of nuclear instruments. Activities and achievements are described concerning the conditioning of laboratories, preventive maintenance and repair of instruments, the management thereof, space parts and the promotion of local training in these subjects. (author)

  1. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  2. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  3. Prediction of attendance at fitness center: a comparison between the theory of planned behavior, the social cognitive theory, and the physical activity maintenance theory.

    Science.gov (United States)

    Jekauc, Darko; Völkle, Manuel; Wagner, Matthias O; Mess, Filip; Reiner, Miriam; Renner, Britta

    2015-01-01

    In the processes of physical activity (PA) maintenance specific predictors are effective, which differ from other stages of PA development. Recently, Physical Activity Maintenance Theory (PAMT) was specifically developed for prediction of PA maintenance. The aim of the present study was to evaluate the predictability of the future behavior by the PAMT and compare it with the Theory of Planned Behavior (TPB) and Social Cognitive Theory (SCT). Participation rate in a fitness center was observed for 101 college students (53 female) aged between 19 and 32 years (M = 23.6; SD = 2.9) over 20 weeks using a magnetic card. In order to predict the pattern of participation TPB, SCT and PAMT were used. A latent class zero-inflated Poisson growth curve analysis identified two participation patterns: regular attenders and intermittent exercisers. SCT showed the highest predictive power followed by PAMT and TPB. Impeding aspects as life stress and barriers were the strongest predictors suggesting that overcoming barriers might be an important aspect for working out on a regular basis. Self-efficacy, perceived behavioral control, and social support could also significantly differentiate between the participation patterns.

  4. Location-specific effects of attention during visual short-term memory maintenance.

    Science.gov (United States)

    Matsukura, Michi; Cosman, Joshua D; Roper, Zachary J J; Vatterott, Daniel B; Vecera, Shaun P

    2014-06-01

    Recent neuroimaging studies suggest that early sensory areas such as area V1 are recruited to actively maintain a selected feature of the item held in visual short-term memory (VSTM). These findings raise the possibility that visual attention operates in similar manners across perceptual and memory representations to a certain extent, despite memory-level and perception-level selections are functionally dissociable. If VSTM operates by retaining "reasonable copies" of scenes constructed during sensory processing (Serences et al., 2009, p. 207, the sensory recruitment hypothesis), then it is possible that selective attention can be guided by both exogenous (peripheral) and endogenous (central) cues during VSTM maintenance. Yet, the results from the previous studies that examined this issue are inconsistent. In the present study, we investigated whether attention can be directed to a specific item's location represented in VSTM with the exogenous cue in a well-controlled setting. The results from the four experiments suggest that, as observed with the endogenous cue, the exogenous cue can efficiently guide selective attention during VSTM maintenance. The finding is not only consistent with the sensory recruitment hypothesis but also validates the legitimacy of the exogenous cue use in past and future studies. PsycINFO Database Record (c) 2014 APA, all rights reserved.

  5. In-school physical activity patterns of primary school learners from ...

    African Journals Online (AJOL)

    Guidelines for the maintenance of health and wellbeing in children recommend at least 60 minutes of moderate-to-vigorous physical activity (MVPA) daily. In South Africa, community sport and recreation facilities and opportunities are meagre in areas previously disadvantaged by apartheid, so schools should be primary ...

  6. Integrity Checking and Maintenance with Active Rules in XML Databases

    DEFF Research Database (Denmark)

    Christiansen, Henning; Rekouts, Maria

    2007-01-01

    While specification languages for integrity constraints for XML data have been considered in the literature, actual technologies and methodologies for checking and maintaining integrity are still in their infancy. Triggers, or active rules, which are widely used in previous technologies for the p...... updates, the method indicates trigger conditions and correctness criteria to be met by the trigger code supplied by a developer or possibly automatic methods. We show examples developed in the Sedna XML database system which provides a running implementation of XML triggers....

  7. A condition-based maintenance policy for multi-component systems with Lévy copulas dependence

    International Nuclear Information System (INIS)

    Li, Heping; Deloux, Estelle; Dieulle, Laurence

    2016-01-01

    In this paper, we propose a new condition-based maintenance policy for multi-component systems taking into account stochastic and economic dependences. The stochastic dependence between components due to common environment is modelled by Lévy copulas. Its influence on the maintenance optimization is investigated with different dependence degrees. On the issue of economic dependence providing opportunities to group maintenance activities, a new maintenance decision rule is proposed which permits maintenance grouping. In order to evaluate the performance of the proposed maintenance policy, we compare it to the classical maintenance policies. - Highlights: • A new adaptive maintenance policy for grouping maintenance actions is proposed. • The impacts of both economic and stochastic dependences are investigated. • The performance of the proposed maintenance policy is evaluated under different system configurations. • The stochastic dependence is modelled by Lévy copulas. • The proposed maintenance decision rule can take full advantage of economic and stochastic dependences.

  8. Factor analysis for imperfect maintenance planning at nuclear power plants by cognitive task analysis

    International Nuclear Information System (INIS)

    Takagawa, Kenichi; Iida, Hiroyasu

    2011-01-01

    Imperfect maintenance planning was frequently identified in domestic nuclear power plants. To prevent such an event, we analyzed causal factors in maintenance planning stages and showed the directionality of countermeasures in this study. There is a pragmatic limit in finding the causal factors from the items based on report descriptions. Therefore, the idea of the systemic accident model, which is used to monitor the performance variability in normal circumstances, is taken as a new concept instead of investigating negative factors. As an actual method for analyzing usual activities, cognitive task analysis (CTA) was applied. Persons who experienced various maintenance activities at one electric power company were interviewed about sources related to decision making during maintenance planning, and then usual factors affecting planning were extracted as performance variability factors. The tendency of domestic events was analyzed using the classification item of those factors, and the directionality of countermeasures was shown. The following are critical for preventing imperfect maintenance planning: the persons in charge should fully understand the situation of the equipment for which they are responsible in the work planning and maintenance evaluation stages, and they should definitely understand, for example, the maintenance bases of that equipment. (author)

  9. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  10. Framework for implementation of maintenance management in distribution network service providers

    International Nuclear Information System (INIS)

    Gomez Fernandez, Juan Francisco; Crespo Marquez, Adolfo

    2009-01-01

    Distribution network service providers (DNSP) are companies dealing with network infrastructure, such as distribution of gas, water, electricity or telecommunications, and they require the development of special maintenance management (MM) capabilities in order to satisfy the needs of their customers. In this sector, maintenance management information systems are essential to ensure control, gain knowledge and improve decision making. The aim of this paper is the study of specific characteristics of maintenance in these types of companies. We will investigate existing standards and best management practices with the scope of defining a suitable ad-hoc framework for implementation of maintenance management. The conclusion of the work supports the proposition of a framework consisting on a processes framework based on a structure of systems, integrated for continuous improvement of maintenance activities. The paper offers a very practical approach to the problem, as a result of more of 10 years of professional experience within this sector, and specially focused to network maintenance.

  11. Paper number: ID 576... Monitoring and maintenance of pumps in LWR

    International Nuclear Information System (INIS)

    Heller, M.; Einzmann, K.

    2001-01-01

    Due to the liberalization of the European Market for electrical power nuclear power plants are progressively subjected to high pressure in respect of reducing the overall costs including for maintenance actions. This concerns also the maintenance of active components as pumps or valves. Siemens Nuclear Power (SNP) has developed a concept for the transition to an integrated condition based maintenance especially for pumps which shall be presented below. It is proposed to make up future decisions on maintenance of pumps only depending on condition data of the component. The concept must be supported by modern monitoring systems, which shall be installed at pumps which are relevant for the safety and availability of the plants. The main technical features of the SNP monitoring system DIROM are presented in detail as an example. First results of acquiring condition related data of a nuclear feed water pump are reported too. The new maintenance concept promises attractive cost benefits in comparison to a former preventive maintenance concept. (author)

  12. Visual short-term memory: activity supporting encoding and maintenance in retinotopic visual cortex.

    Science.gov (United States)

    Sneve, Markus H; Alnæs, Dag; Endestad, Tor; Greenlee, Mark W; Magnussen, Svein

    2012-10-15

    Recent studies have demonstrated that retinotopic cortex maintains information about visual stimuli during retention intervals. However, the process by which transient stimulus-evoked sensory responses are transformed into enduring memory representations is unknown. Here, using fMRI and short-term visual memory tasks optimized for univariate and multivariate analysis approaches, we report differential involvement of human retinotopic areas during memory encoding of the low-level visual feature orientation. All visual areas show weaker responses when memory encoding processes are interrupted, possibly due to effects in orientation-sensitive primary visual cortex (V1) propagating across extrastriate areas. Furthermore, intermediate areas in both dorsal (V3a/b) and ventral (LO1/2) streams are significantly more active during memory encoding compared with non-memory (active and passive) processing of the same stimulus material. These effects in intermediate visual cortex are also observed during memory encoding of a different stimulus feature (spatial frequency), suggesting that these areas are involved in encoding processes on a higher level of representation. Using pattern-classification techniques to probe the representational content in visual cortex during delay periods, we further demonstrate that simply initiating memory encoding is not sufficient to produce long-lasting memory traces. Rather, active maintenance appears to underlie the observed memory-specific patterns of information in retinotopic cortex. Copyright © 2012 Elsevier Inc. All rights reserved.

  13. Maintenance Management Systems in the Czech Enterprises of Chemical and Food Industries

    Directory of Open Access Journals (Sweden)

    Lenka Branska

    2016-12-01

    Full Text Available Purpose of the article: The aim of this article is to use the results of the qualitative research to describe the current form of maintenance systems used in enterprises of chemical and food industries, and then to discuss and generalize the results. Methodology/methods: The primary qualitative research was conducted in five companies, which can be regarded as typical representatives of the industries. The main objective of the primary research in individual companies was to determine how they perform the strategic and tactical operational planning of maintenance, implementation of these plans and their control. Individual interviews with respondents were used as the research method. The results of the research were processed using the content analysis method. Subsequently, comparison of the findings from individual businesses and subsequent synthesis thereof was performed, which allowed making generalizations. Scientific aim: The scientific aim of the article is to develop knowledge in the field of maintenance management by specifying the form of the maintenance systems utilized in Czech enterprises of the chemical and food industries and identifying the main opportunities for their improvement. Findings: Czech enterprises of the chemical and food industries utilize maintenance management systems. These systems are aimed at prevention, emphasizing the planning of maintenance activities in fixed periodic intervals. Also, they often utilize diagnostic maintenance. However, the maintenance systems currently used cannot be considered fully operational, with regard to the relatively large volume of after-failure repairs. Conclusions: Production equipment maintenance systems are irreplaceable in chemical and food industry enterprises, but there is great potential for improvement. Improvement should be focused on the area of strategic as well as tactical and operational planning of production equipment maintenance. In terms of strategy, the biggest

  14. Agricultural Technical Maintenance in the Republic of Belarus

    Directory of Open Access Journals (Sweden)

    V. V. Pavlova

    2004-01-01

    Full Text Available In the process of market reforms introduction of maintenance system as a body of interrelated means, normative documents and executor of services and works with the purpose to ensure efficient designated machinery application and its serviceable condition within the whole service life period takes rather important significance. In order to provide commodity producers with the required types of service it is necessary to create competitive market of service executors. It is recognized that the dealer′s system is the most efficient one out of a great variety of existing and new structures, forms and methods of technical maintenance organization. The system of technical maintenance in the agroindustrial complex of Belarus should ensure profitable conditions of the production activity to all its participants: machinery manufacturers, their users and commercial agents.

  15. Mechanical Intervention for Maintenance of Cartilage and Bone

    Directory of Open Access Journals (Sweden)

    Hui B. Sun

    2011-01-01

    Full Text Available Mechanical loading provides indispensible stimuli for growth and development of the articular cartilage and bone. Interestingly, depending on loading conditions loads applied to the joint can be beneficial as well as harmful to skeletal maintenance and remodeling. Moderate loads to the synovial joint, for instance, suppress the expression levels of matrix metallproteinases (MMPs, while loads above a threshold tend to increase their destructive activities. This report focuses on two recently developed loading modalities from animal studies, joint motion and joint loading. Their unique characteristics and potential usages for maintenance of the articular cartilage and stimulation of bone remodeling are reviewed. Also described are biophysical and molecular mechanisms which likely are responsible for the load-driven maintenance of cartilage and bone, and a possibility of developing load-mediated treatments of osteoporosis and osteoarthritis.

  16. Nuclear power plant maintenance scheduling dilemma: a genetic algorithm approach

    International Nuclear Information System (INIS)

    Mahdavi, M.H.; Modarres, M.

    2004-01-01

    There are huge numbers of components scheduled for maintenance when a nuclear power plant is shut down. Among these components, a number of them are safety related which their operability as well as reliability when plant becomes up is main concerns. Not performing proper maintenance on this class of components/system would impose substantial risk on operating the NPP. In this paper a new approach based on genetic algorithms is presented to optimize the NPP maintenance schedule during shutdown. following this approach the cost incurred by maintenance activities for each schedule is balanced with the risk imposed by the maintenance scheduling plan to the plant operation status when it is up. The risk model implemented in the GA scheduler as its evaluation function is developed on the basis of the probabilistic risk assessment methodology. the Ga optimizers itself is shown to be superior compared to other optimization methods such as the monte carlo technique

  17. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    International Nuclear Information System (INIS)

    Graeber, U.

    2003-01-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  18. Ageing model considering effects of maintenance and working conditions

    International Nuclear Information System (INIS)

    Martorell, S.; Sanchez, A.; Serradell, V.

    1998-01-01

    Nowadays, there is some doubt about building new Nuclear Power Plants (NPPs). Instead, there is a growing interest in analyzing the possibility to extend current NPP operation where life management programs play an important role. The evolution of the NPP safety depends on the evolution of the reliability of its safety components as a function of their age along the NPP operational life. In this paper, a new age-dependent reliability model is presented, which includes parameters related to surveillance and maintenance effectiveness and working conditions, both environmental and operational, of the equipment. This model may be used to support NPP life management and life extension programs by improving or optimizing surveillance and maintenance tasks using risk and cost models based on such an age-dependent reliability model. The results of the sensitivity study in the application show that the selection of the most appropriate maintenance strategy would directly depend on the previous parameters and very important differences are expected to appear under certain circumstance. (Author) 7 refs

  19. The use of condition monitoring information for maintenance planning and decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Rosqvist, T. [VTT Industrial Systems (Finland); Paulsen, J.L. [Risoe National Lab., Roskilde (Denmark)

    2002-12-01

    A survey is presented outlining the use of condition monitoring information in three Nordic nuclear power plants. The questions of the survey relate to the role of condition monitoring in strategic, as well as operative, maintenance planning and decision-making. The survey indicates that condition monitoring is increasingly implemented at nuclear power plants, but very selectively and in a rather slow pace for predictive maintenance. A combined strategy of condition based maintenance and predetermined preventive maintenance is applied for important equipment such as main circulation pumps and steam turbines. A realistic aim is to reduce the number of costly or error prone maintenance and disassembling inspection activities by condition monitoring given that the approach enables a good diagnosis and prediction. Systematic follow-up and analysis of such condition monitoring information followed by a case-specific planning and decision making of timely and rightly directed maintenance actions can justify an extension of the intervals of a number of predetermined inspection, maintenance or periodic testing tasks. (au)

  20. Aging based maintenance and reinvestment scheduling of electric distribution

    Energy Technology Data Exchange (ETDEWEB)

    Korpijarvi, J.

    2012-07-01

    The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented (orig.)

  1. Protein interactions in genome maintenance as novel antibacterial targets.

    Directory of Open Access Journals (Sweden)

    Aimee H Marceau

    Full Text Available Antibacterial compounds typically act by directly inhibiting essential bacterial enzyme activities. Although this general mechanism of action has fueled traditional antibiotic discovery efforts for decades, new antibiotic development has not kept pace with the emergence of drug resistant bacterial strains. These limitations have severely restricted the therapeutic tools available for treating bacterial infections. Here we test an alternative antibacterial lead-compound identification strategy in which essential protein-protein interactions are targeted rather than enzymatic activities. Bacterial single-stranded DNA-binding proteins (SSBs form conserved protein interaction "hubs" that are essential for recruiting many DNA replication, recombination, and repair proteins to SSB/DNA nucleoprotein substrates. Three small molecules that block SSB/protein interactions are shown to have antibacterial activity against diverse bacterial species. Consistent with a model in which the compounds target multiple SSB/protein interactions, treatment of Bacillus subtilis cultures with the compounds leads to rapid inhibition of DNA replication and recombination, and ultimately to cell death. The compounds also have unanticipated effects on protein synthesis that could be due to a previously unknown role for SSB/protein interactions in translation or to off-target effects. Our results highlight the potential of targeting protein-protein interactions, particularly those that mediate genome maintenance, as a powerful approach for identifying new antibacterial compounds.

  2. Experiences on implementation of on-the-job training programmes for maintenance personnel in Asco and Vandellos II NPP

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    2002-01-01

    This paper presents a process and methodology for definition and implementation of On-Job-Training Programmes (OJTP) for new maintenance personnel in Asco and Vandellos II. The content of these OJTP has been defined for each maintenance job position. A simplified task analysis was carried out to specify common and specific training. Generally, the specific maintenance training programs includes training modules in classroom and workshop environment on (1) maintenance of components and (2) maintenance fundamentals of mechanical, electrical and instrumentation. This specific training has been finally completed with a OJT programme based on the execution, observation or/and discussion about the main maintenance activities under entitled worker supervision. Each lesson, task or activity is defined in a format where the training objective, milestones and deliverables are specified. The list of activities makes up the OJTP. It is based on applicable plant procedures and maintenance instruction to each job position. Several participants or actors have been defined to implement the OJTP: co-ordinator of the process, tutors for each OJT task, line maintenance manager and trainee. Co-ordinator is the link among all actors. He knows the OJTP scope and plans the training activities according to the line maintenance manager. Co-ordinator carries out a tracking process, informs to training and maintenance managers about the progress in the programme, elaborates the progress and final reports and keeps training records. Tutors, usually entitled workers in the job position, transfer the knowledge to the trainee and discuss, review and assess the trainee's performance. Trainee carries out the scheduled tasks, keeps records of work done, prepares deliverables and informs about his activities to the Co-ordinator. The OJT programme for each new maintenance worker starts with a launching meeting with all involved actors. The goals of this meeting are to explain the OJTP scope and

  3. Data management in maintenance outsourcing

    International Nuclear Information System (INIS)

    Murthy, D.N.P.; Karim, M.R.; Ahmadi, A.

    2015-01-01

    Most businesses view maintenance as tasks carried out by technicians and the data collected is mostly cost related. There is a growing trend towards outsourcing of maintenance and the data collection issues are not addressed properly in most maintenance service contracts. Effective maintenance management requires proper data management - data collection and analysis for decision-making. This requires a proper framework and when maintenance is outsourced it raises several issues and challenges. The paper develops a framework for data management when maintenance is outsourced and looks at a real case study that highlights the need for proper data management. - Highlights: • Framework for data management in maintenance outsourcing. • Black-box to grey-box approaches for modelling. • Improvements to maintenance decision-making. • Case study to illustrate the approaches and the shortcomings in data collection

  4. Flight Crew Health Maintenance

    Science.gov (United States)

    Gullett, C. C.

    1970-01-01

    The health maintenance program for commercial flight crew personnel includes diet, weight control, and exercise to prevent heart disease development and disability grounding. The very high correlation between hypertension and overweight in cardiovascular diseases significantly influences the prognosis for a coronary prone individual and results in a high rejection rate of active military pilots applying for civilian jobs. In addition to physical fitness the major items stressed in pilot selection are: emotional maturity, glucose tolerance, and family health history.

  5. Design of the randomized, Phase III, QUAZAR AML Maintenance trial of CC-486 (oral azacitidine) maintenance therapy in acute myeloid leukemia.

    Science.gov (United States)

    Roboz, Gail J; Montesinos, Pau; Selleslag, Dominik; Wei, Andrew; Jang, Jun-Ho; Falantes, Jose; Voso, Maria T; Sayar, Hamid; Porkka, Kimmo; Marlton, Paula; Almeida, Antonio; Mohan, Sanjay; Ravandi, Farhad; Garcia-Manero, Guillermo; Skikne, Barry; Kantarjian, Hagop

    2016-02-01

    Older patients with acute myeloid leukemia (AML) have worse rates of complete remission and shorter overall survival than younger patients. The epigenetic modifier CC-486 is an oral formulation of azacitidine with promising clinical activity in patients with AML in Phase I studies. The Phase III, randomized, double-blind, placebo-controlled QUAZAR AML Maintenance trial (CC-486-AML-001) examines CC-486 maintenance therapy (300 mg/day for 14 days of 28-day treatment cycles) for patients aged ≥55 years with AML in first complete remission. The primary end point is overall survival. Secondary end points include relapse-free survival, safety, health-related quality of life and healthcare resource utilization. This trial will investigate whether CC-486 maintenance can prolong remission and improve survival for older patients with AML.

  6. Procedures for maintenance and repairs

    International Nuclear Information System (INIS)

    Pickel, E.

    1981-01-01

    After a general review of the operation experience in the history of more than 12 operating years, the organization in the plant will be shown with special aspect to quality assurance, capacity of the workshops and connected groups as radiation protection, chemical laboratories etc. The number, time intervals and manpower effort for the repeating tests will be discussed. Reasons and examples for back-fitting activities in the plant are given. Besides special repair and maintenance procedures as repair of the steam generators, in-service inspection of the reactor pressure vessel, repair of a feed-water pipe and repair of the core structure in the pressure vessel, the general system to handle maintenance and repair-work in the KWO-plant will be shown. This includes also the detailed planning of the annual refueling and revision of the plant. (orig./RW)

  7. Activities for turbine maintenance: planning, implementation and evaluation of inspection results

    International Nuclear Information System (INIS)

    Azcue, J.; Sanchez, M. A.; Alvaro, M.

    2014-01-01

    The article will cover the most significant aspects of how Tecnatom carry out the turbine maintenance work, both from the point of view of the inspection itself as the pre-and post tasks associated. Thus, the issues that will be part of the article are the Manual Inspection Service (MISI) and the inspection database, ISI WEB. These tools are essential for planning field work and serve as a guide to run later turbine inspections in different plants. Following this introduction the inspection teams and the techniques used by Tecnatom will be described. finally, the article will contain a small mention about management studies of life and integrity analysis of the turbine that can be performed, as well as involvement in its safe operation that is derived from them. Ultimately, the intention is to provide a comprehensive approach to the issue in question, the turbine maintenance work, so that the reader can get an ideal of the whole process. (Author)

  8. Present status of the Nuclear Maintenance Training Center

    International Nuclear Information System (INIS)

    Kotani, Fumio

    1995-01-01

    The education and training to keep and improve the knowledge and skills of the maintenance personnel and to hand down the skills undoubtedly play important roles in safe operation and increased reliability to a nuclear power station. The Nuclear Maintenance Training Center (hereafter called the Center) provides a variety of education and training curriculums based on the levels and abilities of the trainees. The Center aims to enhance the personnel's maintenance technique by offering the curriculums on maintenance basic education for operators and supporting education and training for the personnel of contractors. The Center has two main features: first, it has the actual components or the equipment similar to the actual components which will enable the practical training; second, we regard the past troubles as valuable experiences and, therefore, focuses on the education to prevent recurrence of troubles by teaching the trainees the meaning and necessity of the training they take. For eleven years since the establishment of the Center, it has been utilized by the total number of about 60,000 people. As for the tasks in the future, the Center is expected to vitalize itself to give attractive education and training and become more actively involved in development of the maintenance personnel with the adequate knowledge and skills. (author)

  9. Development of an intellectual maintenance management system. Development of trouble detection and troubleshooting evaluation system

    International Nuclear Information System (INIS)

    Suda, Kazunori; Yoshikawa, Shinji; Tani, Satoshi

    1998-03-01

    Many research activities are conducted to enhance cost performance and safety of nuclear power plants operation and maintenance. Concept of autonomous operating system to equal the role of operators and of maintenance personnel with artificial intelligence and autonomous robots has been developed. An intellectual maintenance management system has been developed to be equipped with decision making functions of maintenance personnel. The intellectual maintenance management system is in charge of maintenance function of an autonomous plant, which consists of plant-wide monitoring, evaluation of component integrity, and scheduling of maintenance activities. In other words, this system should be equipped with preventive maintenance and corrective maintenance functions those are currently loaded on personnel. In this report, we discussed condition monitoring maintenance in the preventive maintenance. We also reported a sensor validation system development for machinery condition monitoring and diagnosis. We adopted distributed and cooperative system construction technique, which is expected recently in applications to large-scale plants. This system has inter-agent communication function for signal transmission and reception among distributed physics models of machineries. The system has been constructed for water/steam system of the LMFBR power plant. The system has been validated to be capable of cooperative sensor validation by the distributed set of agents, with quantitative indication of sensor deviation based on a newly developed fuzzy algorithm with inter-agent cooperation. The derived reference parameter value from the inter-agent evaluations also stands for the alternative measurement to the malfunctioned sensor. (author)

  10. Proactive materials aging management and multi-layered maintenance

    International Nuclear Information System (INIS)

    Shoji, Tetsuo

    2009-01-01

    Long term operation of NPP has been receiving a great concern based upon the plant operation experiences and progressive improvement in countermeasures and mitigations. At the same time of this LTO movement, proactive materials aging management is also receiving a great concern to realize the LTO in NPP. Recent PMDM activities in Japan as well as some international one are reviewed and a necessity of an international cooperation is emphasized in relation to reliable maintenance performance connected from the top of the organization to operators and maintenance engineers at plant sites. (author)

  11. Teaching Guide for Building Maintenance Occupations.

    Science.gov (United States)

    Kempton, Robert F.

    This teaching guide for building maintenance is one of a series of five performance- and employer-based secondary level vocational education guides. Part 1 provides tools, resources, and a process to be used at the local level to develop a training curriculum and supporting instructional activities. It includes a comprehensive overview of the…

  12. The European contribution to the ITER Remote Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Damiani, C., E-mail: carlo.damiani@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Annino, C.; Balagué, S.; Bates, P.; Ceccanti, F.; Di Mascio, T.; Dubus, G.; Esqué, S.; Gonzalez, C.; Lewczanin, M.; Locke, D.; Mont, L.; Olajos, K.; Ranz, R.; Shuff, R.; Puiu, A.; Van Hille, C.; Van Uffelen, M. [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Choi, C.H.; Friconneau, J.P. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); and others

    2014-10-15

    Highlights: •The article introduces the needs for remote maintenance in ITER. •It also discusses some of the issues related to the cultural transition from tokamaks as plasma physics to nuclear reactors. •It highlights the related cultural change and the implications on plant topology and maintenance. •Then, it presents those remote handling systems that will be procured by Europe. •The article emphasises the need of a major involvement of industries from now on. -- Abstract: For a first-of-a-kind nuclear fusion reactor like ITER, remote maintainability of neutron-activated components is one of the key aspects of plant design and operations, and a fundamental ingredient for the demonstration of long-term viability of fusion as energy source. The European Domestic Agency (EU DA, i.e. Fusion for Energy, F4E) is providing important support to the ITER Organisation (IO) in specifying the functional requirements of the Remote Handling (RH) Procurement Packages (i.e. the subsystems allocated to EU DA belonging to the overall ITER Remote Maintenance Systems IRMS), and in performing design and R and D activities – with the support of national laboratories and industries – in order to define a sound concept for these packages. Furthermore, domestic industries are being involved in the subsequent detailed design, validation, manufacturing and installation activities, in order to actually fulfil our procurement-in-kind obligations. After an introduction to ITER Remote Maintenance, this paper will present status and next stages for the RH systems allocated to EU DA, and will also illustrate complementary aspects related to cross cutting technologies like radiation tolerant components and RH control systems. Finally, the way all these efforts are coordinated will be presented together with the overall implementation scenario and key milestones.

  13. Homogenization of independent inspection criteria of Quality Assurance in the maintenance activities; Homogeneizacion de criterios en la inspeccion independiente de Garantia de Calidad a las actividades de mantenimiento

    Energy Technology Data Exchange (ETDEWEB)

    Gomez Cardinanos, R.

    2012-07-01

    Among the official documents governing the operation of Spanish nuclear power plants is the Quality Manual and Quality Assurance. This manual gives a formal answer to the requirements of the regulations and the Nuclear Safety Council. To monitor the compliance of its requirements, the plants are controlled by independent organizations. Since 2007, in nuclear Sta. Maria de Garona is developed a project to improve the performance of the QA inspectors during maintenance activities. Results of the project have been edited data sheets on specific activities of maintenance. The project aims to incorporate sheets that help QA inspectors in their daily inspection.

  14. A company-wide activity to grow safety culture in a maintenance department of nuclear power plant

    International Nuclear Information System (INIS)

    Fukui, Hirokazu; Sugiman, Toshio

    2008-01-01

    This study aims to conduct a field survey to collect specific instances of 'learning activity' that would help develop a safety culture in a maintenance department of nuclear power plant, with 'activity theory' as a theoretical base, and to derive a conceptual model that portrays these instances as part of comprehensive organizational activities. First, the field survey found instances where an accident that occurred a few years ago provided momentum; a company-wide activity is being implemented in order to fulfill the requests of field workers so that their requests for improvements are positively honored and budgets are allocated to measures designed to accommodate these requests. This paper calls this company-wide activity 'an activity to materialize the requests for improvements in the workplace' and considers it to be a typical instance of learning activity. Second, the field survey found that, in the workplace under discussion, a daily meeting was held in a unique way and a study session was conducted frequently and regularly. Last, we came up with a conceptual model for the entire aspect of organizational activities in which we could position the above instances as well as the results of our past field surveys. This model conceptualizes organizational activities from the two aspects of 'learning activity (primary learning activity)' and 'management activity) and characterizes an activity that would transform the existing organizational activities into ones that could not be even predicted as 'secondary learning activity'. 'An activity to materialize the requests for improvement in the workplace' was taken as falling under the category of secondary learning activity. (author)

  15. Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Seyyed Mohammad Hassan Hosseini

    2016-05-01

    Full Text Available Scheduling problem for the hybrid flow shop scheduling problem (HFSP followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All machines can process all kinds of parts in this stage but each machine can process only one part at the same time. The second stage is a single assembly machine or a single assembly team of workers. The aim is to schedule the parts on the machines and assembly sequence and also determine when the preventive maintenance activities get done in order to minimize the completion time of all products (makespan. A mathematical modeling is presented and its validation is shown by solving an example in small scale. Since this problem has been proved strongly NP-hard, in order to solve the problem in medium and large scale, four heuristic algorithms is proposed based on the Johnson’s algorithm. The numerical experiments are used to run the mathematical model and evaluate the performance of the proposed algorithms.

  16. FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-11-01

    The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments

  17. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  18. Flexible Software Solution for Information System of Maintenance and Repair in Armenian NPP Medzamor

    International Nuclear Information System (INIS)

    Stoilova Yordanova, V.; Manchev, B.

    2016-01-01

    Achieving high performance in maintenance and repair activities in nuclear facilities and good results in this area is not possible without proper planning. This includes long-term, medium-term and annual planning. A computerized information maintenance management system is a tool widely used by nuclear operators to achieve safe, reliable, stable and predictable plant operation. Development and implementation of such a system in the Armenian NPP Medzamor (ANPP) was initiated by the European Commission (EC) in August 2013 based on the decision of ANPP management to improve practice in terms of planning and carrying out maintenance and repair of plant structures, systems and components (SSCs). The main purpose for the development and deployment of information maintenance management system in ANPP is creation of a systematic approach to the distribution of tasks between the maintenance personnel as well as the timing and methods of their implementation - on which systems, structures and components, maintenance frequency, while the ultimate goal is to optimize the use of resources for maintenance and to ensure plant safe operation and reliability. In November 2013 a contract between European Commission and consortium Risk Engineering -David Holding was signed, including the following supplies: Hardware for the information system of ANPP (called us Archimed MRO); Specification, design and development of the software of Archimed MRO, installation of the system, data migration, training of ANPP staff operating the system, and 9 months trial operation. In the process of specifying the functionality of the system the main purpose was to provide modern information tools to help improve the work of ANPP personnel in the following areas: Optimization of ANPP maintenance program; Planning of maintenance, repair and overhaul (MRO) activities; Effective management of the processes of MRO; Analysis of the MRO results (trend analysis, recurrence of repairs, quality of the repairs

  19. Integrated preventive maintenance and production decisions for imperfect processes

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Nahas, Nabil; Ben-Daya, Mohamed

    2016-01-01

    This paper integrates production, maintenance, and quality for an imperfect process in a multi-period multi-product capacitated lot-sizing context. The production system is modeled as an imperfect machine, whose the status is considered to be either in-control or out-of-control. When the machine is out of control, it produces a fraction of nonconforming items. During each period, this machine is inspected and imperfect preventive maintenance activities are simultaneously performed to reduce its age, proportional to the preventive maintenance level. The objective is to minimize the total cost, while satisfying the demand for all products. Our optimization model allows for a joint selection of the optimal values of production plan, and the maintenance policy, while taking into account quality related costs. A solution algorithm is developed and illustrative numerical examples are presented. It is found that the increase in PM level leads to reductions in quality control costs. Furthermore, if the cost of performing PM is high to the point where it is not compensated for by reductions in the quality related costs, then performing PM is not justifiable. Finally, using non-periodic preventive maintenance with the possibility of different preventive maintenance levels may result in an improvement of the total cost. - Highlights: • We integrate production, maintenance, and quality. • We evaluate all the expected costs. • Our model allows for a joint selection of the optimal values. • A solution algorithm is developed. • Increasing PM level will decrease quality control costs.

  20. Status of maintenance in the US nuclear power industry 1985. Volume 1. Findings and conclusions

    International Nuclear Information System (INIS)

    1986-06-01

    This report presents the findings, conclusions and recommendations derived from activities performed under Phase I of the NRC Maintenance and Surveillance Program (MSP). Findings are based on trends and patterns derived from operational data compiled by the NRC for the period 1980 through 1985, site surveys conducted at eight plants, and questionnaires administered to NRC Resident Inspectors to characterize nuclear power plant maintenance programs and practices. These activities have shown that plant maintenance programs and practices are highly variable from plant-to-plant and are currently undergoing major changes. While measured plant performance has improved overall since 1980, the maintenance-related contribution to reportable events and challenges to safety systems remains high and is increasing by some measures. The findings of Phase I of the MSP confirmed a number of problems in nuclear power plant maintenance which warrant further NRC and industry attention

  1. Remote maintenance of Compact Ignition Tokamak ex-vessel systems

    International Nuclear Information System (INIS)

    DePew, R.E.; Macdonald, D.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel in the Compact Ignition Tokamak (CIT) will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion device's auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. Throughout the CIT remote maintenance (RM) studies conducted to date, computer modeling has been used extensively to investigate manipulator access in these complex, tightly packed, and cluttered surroundings. A recent refinement of computer modeling involves the use of an intelligent engineering work station for realtime interactive display of task simulations. This paper discusses the use of three-dimensional (3-D) kinematic computer models of the CIT machines that are proving to be powerful tools in our efforts to evaluate RM requirements. This presentation includes a video-taped simulation of remote replacement of a plasma viewing assembly. The simulation illustrates some of the constraints associated with typical RM activities and the ways in which computer modeling enhances the design process. 1 ref., 3 figs

  2. New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization

    International Nuclear Information System (INIS)

    Samrout, M.; Yalaoui, F.; Cha-hat telet, E.; Chebbo, N.

    2005-01-01

    This article is based on a previous study made by Bris, Chatelet and Yalaoui [Bris R, Chatelet E, Yalaoui F. New method to minimise the preventive maintenance cost of series-parallel systems. Reliab Eng Syst Saf 2003;82:247-55]. They use genetic algorithm to minimize preventive maintenance cost problem for the series-parallel systems. We propose to improve their results developing a new method based on another technique, the Ant Colony Optimization (ACO). The resolution consists in determining the solution vector of system component inspection periods, T P . Those calculations were applied within the programming tool Matlab. Thus, highly interesting results and improvements of previous studies were obtained

  3. Heat sink considerations during SLAR defuelling activities of the 1995 maintenance outage at the Point Lepreau G.S

    International Nuclear Information System (INIS)

    Richard, R.A.; Edgar, D.J.; Gibb, R.A.

    1996-01-01

    In order to conduct the Spacer Locate and Reposition (SLAR) activities, individual fuel channels were de-fuelled using the SLAR tool itself. The presence of the tool in the channel containing fuel caused concerns over channel flow interruption. A methodology was devised to assess the limited fuel heat up during de-fuelling and during possible prolonged periods of complete flow interruption. Once established, the approach could be used to assess the effect of varying parameters which could effect channel heat-up. Costly delays in SLAR maintenance activities were avoided by ensuring the sequence of channel visits was such that the individual channel powers decayed sufficiently to prevent channel heat up beyond acceptable temperature limits. (author)

  4. Electrical predictive maintenance at Trillo I Nuclear Power Plant

    International Nuclear Information System (INIS)

    Vicente, L. R.; Fernandez de la Mata, R.; Cano Gonzalez, J. C.

    1998-01-01

    An electrical predictive maintenance plan is currently being put into effect at Trillo I Nuclear Power Plant which is initially being applied to three types of equipment: motors, transformers and motor-driven valves. This paper describes the different phases considered in the implementation of the Predictive Maintenance Plan: study of existing techniques for such equipment (tangoδ, spectral analysis of stator current, chromatographic analysis of gases, spectral analysis of the axial stray magnetic flux, etc), study of the special characteristics of the electrical equipment at Trillo NPP, analysis of applicable techniques (characteristic parameters, alert-alarm values, experience with such techniques, etc), analysis of machine history records, study of the optimum preventive-predictive case, study of applicable frequencies and definition of the computerised predictive maintenance management tool. With the exception of the computerised predictive maintenance management applications which are presently being implemented, all the activities described above have been carried out on the three types of equipment mentioned. (Author)

  5. Radiological implications of contact maintenance: Impacts on facility design

    International Nuclear Information System (INIS)

    Brown, R.C.

    1994-01-01

    The purpose of this document is to provide an initial, rough order of magnitude, evaluation of the relationship between the concentrations of selected radionuclides in process streams of a chemical process plant and the required degree of protective features for plant operations personnel. The evaluation provided in this document specifies ''trigger level'' concentrations of 90 Sr, 137 Cs, and transuranics (TRU) for ''contact maintenance'' activities. Concentrations above the ''trigger levels'' can be accommodated provided offsetting design features are incorporated (e.g., improved shielding partial to total confinement, etc.). This information will assist in defining the degree of reduction of concentrations of radionuclides required for the feed used in a low-level liquid waste processing plant to utilize a contact maintenance design concept. Offsetting design features that influence maintenance personnel exposures in a contact maintenance situation are identified. All concentrations are expressed in terms of actual process fluids before any flushing and decontamination steps

  6. Proceedings of the workshop on better nuclear plant maintenance: improving human and organisational performance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-05

    A significant proportion of nuclear plant events is attributable to failures that take place during maintenance and periodic testing. Human and organisational factors are frequently identified as making a major contribution to these events. Despite this recognition, licensee and regulatory oversight in the human and organisational area has tended to focus more on operational matters than maintenance. Owing to the importance of human and organisational performance on nuclear plant maintenance, the CSNI Special Experts' Group on Human and Organisational Factors (SEGHOF) hosted a workshop entitled 'Better nuclear plant maintenance: improving human and organisational performance'. The workshop provided an international forum for staff from nuclear plants, research bodies, and regulators to discuss human and organisational challenges to maintenance, and initiatives to support effective performance. Over 60 participants from about 20 countries participated. The workshop was divided into five sessions: 1) International guidance to improve maintenance performance; 2) Lessons learned through maintenance operating experience; 3) Licensee initiatives to support reliable maintenance; 4) Regulatory approaches to assuring effective licensee maintenance; and 5) Recent trends and their impact on maintenance. Sessions commenced with oral presentations of papers followed by break-out and plenary discussions. Session 4 on regulatory approaches included short presentations from ten regulatory bodies and was followed by discussion comparing these approaches. The main findings of the workshop concern: the retirements of experienced staff; the increasing use of contractors to perform maintenance activities; the use of skill-broadening in maintenance; the role of supervisors at the plant level; the organisational changes that are used to optimise the use of plant staff resources; the effective planning of maintenance tasks; the time allowed to complete maintenance tasks; the development

  7. Selective maintenance for multi-state series–parallel systems under economic dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.; Pandey, Mayank

    2014-01-01

    This paper presents a study on selective maintenance for multi-state series–parallel systems with economically dependent components. In the selective maintenance problem, the maintenance manager has to decide which components should receive maintenance activities within a finite break between missions. All the system reliabilities in the next operating mission, the available budget and the maintenance time for each component from its current state to a higher state are taken into account in the optimization models. In addition, the components in series–parallel systems are considered to be economically dependent. Time and cost savings will be achieved when several components are simultaneously repaired in a selective maintenance strategy. As the number of repaired components increases, the saved time and cost will also increase due to the share of setting up between components and another additional reduction amount resulting from the repair of multiple identical components. Different optimization models are derived to find the best maintenance strategy for multi-state series–parallel systems. A genetic algorithm is used to solve the optimization models. The decision makers may select different components to be repaired to different working states based on the maintenance objective, resource availabilities and how dependent the repair time and cost of each component are

  8. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  9. Design criteria document, Maintenance Shop/Support Facility, K-Basin Essential Systems Recovery, Project W-405

    International Nuclear Information System (INIS)

    Strehlow, M.W.B.

    1994-01-01

    During the next 10 years a substantial amount of work is scheduled in the K-Basin Area related to the storage and eventual removal of irradiated N-Reactor fuel. Currently, maintenance support activities are housed in existing structures that were constructed in the early 1950's. These forty-year-old facilities and their supporting services are substandard, leading to inefficiencies. Because of numerous identified deficiencies and the planned increase in the numbers of K-Basin maintenance personnel, adequate maintenance support facilities that allow efficient operations are needed. The objective of this sub-project of Project W-405 is to provide a maintenance and storage facility which meets the K-Basin Maintenance Organization requirements as defined in Attachment 1. In Reference A, existing guidelines and requirements were used to allocate space for the maintenance activities and to provide a layout concept (See Attachment 2). The design solution includes modifying the existing 190 K-E building to provide space for shops, storage, and administration support functions. The primary reason for the modification is to simplify siting/permitting and make use of existing infrastructure. In addition, benefits relative to design loads will be realized by having the structure inside 190K-E. The new facility will meet the Maintenance Organization approved requirements in Attachment 1 relating to maintenance activities, storage areas, and personnel support services. This sub-project will also resolve outstanding findings and/or deficiencies relating to building fire protection, HVAC requirements, lighting replacement/upgrades, and personnel facilities. Compliance with building codes, local labor agreements and safety standards will result

  10. Manual on maintenance of systems and components important to safety

    International Nuclear Information System (INIS)

    1986-01-01

    The Manual should serve as guidance at the plant management level for the maintenance of systems and components important to safety. It includes a detailed description of management systems, administrative controls and procedures. The Annexes contain examples of documents and practices adopted by Operating Organizations of some Member States. It is not the intention of this Manual to address the technical problem of how to maintain a particular component but rather to cover the programmatic aspects of maintenance. It also contains some aspects of surveillance and verification activities. The Manual makes only general statements about radiation protection provisions in connection with maintenance; detailed guidance can be found in other IAEA documents

  11. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  12. Maintenance grouping strategy for multi-component systems with dynamic contexts

    International Nuclear Information System (INIS)

    Vu, Hai Canh; Do, Phuc; Barros, Anne; Bérenguer, Christophe

    2014-01-01

    This paper presents a dynamic maintenance grouping strategy for multi-component systems with both “positive” and “negative” economic dependencies. Positive dependencies are commonly due to setup cost whereas negative dependencies are related to shutdown cost. Actually, grouping maintenance activities can save part of the setup cost, but can also in the same time increase the shutdown cost. Until now, both types of dependencies have been jointly taken into account only for simple system structures as pure series. The first aim of this paper is to investigate the case of systems with any combination of basic structures (series, parallel or k-out-of n structures). A cost model and a heuristic optimization scheme are proposed since the optimization of maintenance grouping strategy for such multi-component systems leads to a NP-complete problem. Then the second objective is to propose a finite horizon (dynamic) model in order to optimize online the maintenance strategy in the presence of dynamic contexts (change of the environment, the working condition, the production process, etc). A numerical example of a 16-component system is finally introduced to illustrate the use and the advantages of the proposed approach in the maintenance optimization framework. - Highlights: • A dynamic grouping maintenance strategy for complex structure systems is proposed. • Impacts of the system structure on grouping maintenance are investigated. • A grouping approach based on the rolling horizon and GA algorithm is proposed. • Different dynamic contexts and their impacts on grouping maintenance are studied. • The proposed approach can help to update the maintenance planning in dynamic contexts

  13. What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?

    CERN Document Server

    Baird, S

    2014-01-01

    Assuming that Linac4 is connected to the PSB in LS2, we will outline the maintenance and basic consolidation works that will be needed to maintain design performance of the LHC and its Injector chain until 2035, with an overall reliability as good as that achieved in the first LHC operation period 2009 to 2013. Using these data we will estimate the shutdown schedule needed throughout this period to complete these maintenance and consolidation works. These estimates will also include the required radiation cool-down periods, time for system re-commissioning and testing as well as the time needed to restart the accelerator chain for LHC colliding beam operation. As some of the consolidation activities needed for the PS and SPS machines are related to the radia tion dose taken by the machine equipment (e.g., irradiated cable replacement and magnet renovation) the variation of these time estimates as a function of beam losses in the Injector chain will also be covered.

  14. Maintenance of electromechanical equipment in quality organization under operating conditions

    International Nuclear Information System (INIS)

    Mercier, J.P.

    1984-01-01

    The paper outlines the principles adopted by the Thermal Production Service of Electricite de France on the basis of the experience of the first years of operation of its 900 MW(e)PWR units for the purpose of improving quality organization in operating conditions in respect of the maintenance of electromechanical safety equipment. This organization is based on application of the usual principles for quality assurance, adapted in accordance with current French regulations. The paper first recalls the now traditional methods of applying the principles of quality organization in the area of equipment maintenance. It then defines particular so-called ''delicate'' activities which, in accordance with the above regulations, are subjected to additional quality organizational procedures; this applies in particular to the area of pre-maintenance preparation and studies and to the control exercised by the French safety authorities over the execution of those activities. The paper explains how the application of the regulations improves maintenance practices compared with standard quality organization. It describes how the attempt to establish a frontier between these two types of activity (current and ''delicate'') has led to the definition of a classification criterion which is technically correct and simple to use and is based on the professional skills of those performing each activity. The paper then describes in greater detail the principal rules for the performance of those tasks which come under the standard organization and those to which more stringent criteria apply. Lastly, it explains the thinking behind equipment surveillance programmes and the analysis of anomalies discovered through surveillance measures or brought to light by operating incidents, the aim of these being to benefit from the experience gained

  15. Regulatory issues in the maintenance of Argentine nuclear power plants

    International Nuclear Information System (INIS)

    Castro, E.; Caruso, G.

    1997-01-01

    The influence of maintenance activities upon nuclear safety and their relevance as means to detect and prevent aging make them play an outstanding role among the fields of interest of the Argentine nuclear regulatory body (ENREN). Such interest is reinforced by the fact that the data obtained during maintenance are used - among other - as inputs in the Probabilistic Safety Analyses required for those nuclear power plants. This paper provides a brief description of the original requirements by the regulatory body concerning maintenance, of the factors that led to review the criteria involved in such requirements and of the key items identified during the reviewing process. The latter shall be taken into account in the maintenance regulatory policy, for the consequent issue of new requirements from the utilities and for the eventual publication of a specific regulatory standard. (author)

  16. Computerization of operation and maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs

  17. Computerization of operation and maintenance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report provides a resource for computerization of activities in plant operation and maintenance. Experience gained from design and implementation of various computer systems around the world is described. The material may be useful as a guide to modification and upgrading of existing plants as well as design and engineering of new plants. It should be particularly of interest to managers and engineers who are engaged in planning, bidding, specifying or designing computer systems for operation and maintenance applications. Refs, figs and tabs.

  18. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  19. Maintenance performance improvement with System Dynamics : A Corrective Maintenance showcase

    NARCIS (Netherlands)

    Deenen, R.E.M.; Van Daalen, C.E.; Koene, E.G.C.

    2008-01-01

    This paper presents a case study of an analysis of a Corrective Maintenance process to realize performance improvement. The Corrective Maintenance process is supported by SAP, which has indicated the performance realisation problem. System Dynamics is used in a Group Model Building process to

  20. Long-term development of nuclear maintenance service provider in Slovenia

    International Nuclear Information System (INIS)

    Androjna, A.; Racic, Z.; Balazic, D.

    2004-01-01

    In recent years, most utilities have been facing a challenge of optimizing maintenance costs, while maintaining or improving equipment reliability. As the equipment ages and maintenance skills within the plant staff may decline due to a generation exchange, the challenge becomes even stronger. Consequently, many plants are looking for possible solutions through partnering with maintenance service providers. The fact that there is only one nuclear power plant in Slovenia hinders the development of local maintenance contractors to some extent. Additionally, they have to face everincreasing technical and organizational requirements while a longer fuel cycle and shorter outage durations result in a narrower annual scope of outage activities. In such circumstances, it may be very difficult for local maintenance service providers to retain and improve skills and qualifications in the long run. Even more so, since they also face the need to rejuvenate their staff and the interest of subcontractors to participate diminishes. The paper presents a case on long-term development issues as experienced by NUMIP, the leading Slovenian nuclear maintenance service provider. Above all, we would like to contribute to a better understanding of efficient local maintenance support. NUMIP's future strategic options are explored in light of possible partnering relationship with the nuclear power plant, based on trust, win-win attitude and continuous improvement. Long-term benefits of the proposed partnering are indicated for both parties, the nuclear power plant and the local maintenance service provider. (author)

  1. Application of the reliability theory on the analysis of the effects of sbwr' main control console maintenance

    International Nuclear Information System (INIS)

    Widagdo, S.

    1997-01-01

    Maintenance activities on the main control console, which is a primary element of the man-machine interface system, are a source of concern. this concern has been arisen since the main control function is the central part to observe and control the reactor operation. the paper will discuss a study of the effects of main control console maintenance activity upon the operability of SBWR. the first step is learning the SBWR main control room design in order to know its monitoring and controlling capability and then makes an assumption of maintenance requirement followed by an evaluation of the effects of the maintenance activity. it is assumed that 2 years or equivalent to 17.520 hours are the reference time for one cycle operation of SBWR. the aim is to identify any adverse effects and eliminate or minimize them through design improvements. the evaluation method used here is the reability theory R(t) = e sup-λt. Based on the result of the evaluation can be concluded that there are no negative effects of maintenance activity upon the operability of the SBWR

  2. 23 CFR 633.208 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... responsibility of the State. The State may arrange for maintenance of such roads or portions thereof, by... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance. 633.208 Section 633.208 Highways FEDERAL... PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.208 Maintenance. Maintenance of all highway...

  3. Report of the Service for maintenance of mechanical structures - Annex 2

    International Nuclear Information System (INIS)

    Radivojevic, J.

    1976-01-01

    This Annex 2 describes the organizational structure and activities of the Service for maintenance of the mechanical structures of the RA reactor, inspection and maintenance of of reactor components, workshop and storage of spare parts at the reactor. Mechanical structures of the RA reactor included are: heavy water system, gas systems, technical water system, reactor core, and transportation equipment [sr

  4. Recent progress in the field of automated welding applied to maintenance activities

    International Nuclear Information System (INIS)

    Cullafroz, M.

    2004-01-01

    Automated and robot welding has 5 advantages compared to manual welding: -) under some conditions the automated circular welding does not require requalification testing as manual welding does, -) welding heads in robots have a reduced size compared to manual gears so they can enter and treat complex piping, -) by using an adequate viewing system the operator can be more than 10 meters away from the welding site which means that the radiation doses he receives is cut by a factor 1.5 to 2, -) whatever the configuration is, the deposition rate in automated welding stays high, the quality standard is steady and the risk of repairing is low, -) a gain in productivity if adequate equipment is used. In general, automated welding requires a TIG welding process and is applied in maintenance activities to: -) the main primary system and other circuits in stainless austenitic steels, -) the main secondary system and other circuits in low-percentage carbon steels, and -) the closure of spent fuel canisters. An application to the repairing of BWR's pipes is shown. (A.C.)

  5. An approach to integrating surveillance and maintenance tasks to prevent the dominant failure causes of critical components

    International Nuclear Information System (INIS)

    Martorell, S.; Munoz, A.; Serradell, V.

    1995-01-01

    Surveillance requirements and maintenance activities in a nuclear power plant aim to preserve components' inherent reliability. Up to now, predictive and preventive maintenance mainly concerned plant staff, but the US Nuclear Regulatory Commission Maintenance Rule released in July 1991 will have significant impact on how nuclear power plants perform and document this maintenance. Reliability Centered Maintenance (RCM) is a systematic methodology to establish maintenance tasks for critical components in plant with a high degree of compliance with the goals of the Rule. RCM pursues the identification of applicable and efficient tasks to prevent these components from developing their dominant failure causes, and, in turn, towards achieving proper levels of components availability with low cost. In this paper, we present an approach for identifying the most suitable set of tasks to achieve this goal, which involves the integration of maintenance activities and surveillance requirements for each critical component based on the unavailability and cost associated with each individual task which is performed on it

  6. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  7. Age-dependent reliability model considering effects of maintenance and working conditions

    International Nuclear Information System (INIS)

    Martorell, Sebastian; Sanchez, Ana; Serradell, Vicente

    1999-01-01

    Nowadays, there is some doubt about building new nuclear power plants (NPPs). Instead, there is a growing interest in analyzing the possibility to extend current NPP operation, where life management programs play an important role. The evolution of the NPP safety depends on the evolution of the reliability of its safety components, which, in turn, is a function of their age along the NPP operational life. In this paper, a new age-dependent reliability model is presented, which includes parameters related to surveillance and maintenance effectiveness and working conditions of the equipment, both environmental and operational. This model may be used to support NPP life management and life extension programs, by improving or optimizing surveillance and maintenance tasks using risk and cost models based on such an age-dependent reliability model. The results of the sensitivity study in the example application show that the selection of the most appropriate maintenance strategy would directly depend on the previous parameters. Then, very important differences are expected to appear under certain circumstances, particularly, in comparison with other models that do not consider maintenance effectiveness and working conditions simultaneously

  8. Distinct electrophysiological indices of maintenance in auditory and visual short-term memory.

    Science.gov (United States)

    Lefebvre, Christine; Vachon, François; Grimault, Stephan; Thibault, Jennifer; Guimond, Synthia; Peretz, Isabelle; Zatorre, Robert J; Jolicœur, Pierre

    2013-11-01

    We compared the electrophysiological correlates for the maintenance of non-musical tones sequences in auditory short-term memory (ASTM) to those for the short-term maintenance of sequences of coloured disks held in visual short-term memory (VSTM). The visual stimuli yielded a sustained posterior contralateral negativity (SPCN), suggesting that the maintenance of sequences of coloured stimuli engaged structures similar to those involved in the maintenance of simultaneous visual displays. On the other hand, maintenance of acoustic sequences produced a sustained negativity at fronto-central sites. This component is named the Sustained Anterior Negativity (SAN). The amplitude of the SAN increased with increasing load in ASTM and predicted individual differences in the performance. There was no SAN in a control condition with the same auditory stimuli but no memory task, nor one associated with visual memory. These results suggest that the SAN is an index of brain activity related to the maintenance of representations in ASTM that is distinct from the maintenance of representations in VSTM. © 2013 Elsevier Ltd. All rights reserved.

  9. Maintenance cost savings - snubber elimination with limit stops

    International Nuclear Information System (INIS)

    Cloud, R.L.; Taylor, W.H.

    1993-01-01

    'Active' snubbers can be replaced with 'passive' Limit Stops using two separate strategies. One is a straightforward piping re-analysis to optimize the number of dynamic supports and replace remaining snubbers with Limit Stops. A second approach is to take implicit advantage of the margins afforded by the ASME Code Case N-411 reduced damping ratios and simply replace snubbers one-for-one with no re-analysis. Both methods result in major maintenance cost savings and both have been discussed with the NRC. Approaches to maintenance cost reduction using these strategies are discussed in this paper

  10. Maintenance of Structures, Systems and Components of the RSG-GAS Reactor as an Implementation of BAPETEN Regulation No. 5 Year 2011

    International Nuclear Information System (INIS)

    Aep Saepudin Catur; Dede Solehudin Fauzi; Djunaidi

    2012-01-01

    Maintenance activities for structures, systems and components of the reactor, consider prerequisites for the operation of the non power reactor. This activity is intended to ensure that the structures, systems and components function properly. Implementation of reactor maintenance carried out starting from programs establishment, scheduling, maintenance accomplishment and maintenance report. This paper will describe the implementation of reactor maintenance non power as required by BAPETEN regulation no.5, year 2011. By understanding correctly of this regulation, it is expected that maintenance activity of structures, systems and components of the reactor can be successfully performed. The RSG-GAS reactor has implemented various types of reactor maintenance based on BAPETEN regulation no.5 year 2011 properly. As a result failure of the structures, systems and components of the reactor can be minimized then they can be kept reliable. (author)

  11. Asphalt in Pavement Maintenance.

    Science.gov (United States)

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  12. [2,3-diphosphoglycerate level during the active and maintenance treatment of iron-deficiency anemia patients].

    Science.gov (United States)

    Iordanova, E; Dosheva, I; Lulcheva, F; Tsvetkova, N; Dobrev, K

    1985-01-01

    The objective of the present study was to obtain information about the duration of tissue hypoxia in patients with iron deficiency anemia. That fact is of importance for the determination of the duration of maintenance iron therapy. The level of 2,3-diphosphoglycerate was studied during the treatment, after the correction of anemic syndrome and after 60-day out-patient department treatment. The data obtained revealed that the level of 2,3-diphosphoglycerate was considerably elevated, as compared with the norm, before the treatment. After the active treatment and correction of anemic syndrome it was decreased, but remaining above the norm. By the 60th day of the out-patient department treatment the decrease continued and the level of 2,3-diphosphoglycerate approached the norm.

  13. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  14. An analysis of human maintenance failures of a nuclear power plant

    International Nuclear Information System (INIS)

    Pyy, P.

    2000-01-01

    In the report, a study of faults caused by maintenance activities is presented. The objective of the study was to draw conclusions on the unplanned effects of maintenance on nuclear power plant safety and system availability. More than 4400 maintenance history reports from the years 1992-1994 of Olkiluoto BWR nuclear power plant (NPP) were analysed together with the maintenance personnel. The human action induced faults were classified, e.g., according to their multiplicity and effects. This paper presents and discusses the results of a statistical analysis of the data. Instrumentation and electrical components appeared to be especially prone to human failures. Many human failures were found in safety related systems. Several failures also remained latent from outages to power operation. However, the safety significance of failures was generally small. Modifications were an important source of multiple human failures. Plant maintenance data is a good source of human reliability data and it should be used more in the future. (orig.)

  15. Statistical analysis of human maintenance failures of a nuclear power plant

    International Nuclear Information System (INIS)

    Pyy, P.

    2000-01-01

    In this paper, a statistical study of faults caused by maintenance activities is presented. The objective of the study was to draw conclusions on the unplanned effects of maintenance on nuclear power plant safety and system availability. More than 4400 maintenance history reports from the years 1992-1994 of Olkiluoto BWR nuclear power plant (NPP) were analysed together with the maintenance personnel. The human action induced faults were classified, e.g., according to their multiplicity and effects. This paper presents and discusses the results of a statistical analysis of the data. Instrumentation and electrical components are especially prone to human failures. Many human failures were found in safety related systems. Similarly, several failures remained latent from outages to power operation. The safety significance was generally small. Modifications are an important source of multiple human failures. Plant maintenance data is a good source of human reliability data and it should be used more, in future. (orig.)

  16. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  17. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  18. Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance

    International Nuclear Information System (INIS)

    Doyle, E. Kevin

    2002-01-01

    As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at

  19. The maintenance and the data bank of Spanish NNPP (DACNE SYSTEM)

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    1995-01-01

    New projects and activities appear at Nuclear Industry with the purpose of improving availability and safety of the plants, i.e. Probabilistic Safety Assessment (PSA), maintenance optimization programs or life extension programs. A common characteristic of these projects is that they need collect data from different sources. A multipurpose information system, as Spanish DACNE System, can be useful. Some applicabilities are presented in maintenance area. (Author)

  20. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    Energy Technology Data Exchange (ETDEWEB)

    Graeber, U.

    2003-07-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)