WorldWideScience

Sample records for preventive maintenance pm

  1. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  2. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  3. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  4. Preventive maintenance basis: Volume 31 -- Relays -- timing. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to timing relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  5. Preventive maintenance basis: Volume 30 -- Relays -- control. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to control relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  6. After reliability centred maintenance. Preventive maintenance living program implementation at Bruce Power

    International Nuclear Information System (INIS)

    Harazim, Michael L.; Ferguson, Brian J.

    2003-01-01

    Industrial preventive maintenance (PM) programs represent a large part of plant O and M costs. PM Optimization (PMO) projects represent an effective mechanism for identifying unnecessary PM, extending PM intervals and infusing predictive maintenance (PdM) methods. However, once optimized, what process prevents the PM program from returning to a state of disarray? This is the function of a PM living program (PMLP). In 1997, an independent performance assessment identified concerns with the applicability and effectiveness of all Ontario Power Generation, Inc. (OPGI) PM programs. In response, OPGI instituted an Integrated Maintenance Program (IMP) including Reliability Centred Maintenance (RCM) and a PMLP. It should be noted that the PMLP was developed for the 3 OPGI nuclear Sites (i.e. Bruce, Pickering, and Darlington). Effective 1 May 2001, the Bruce Site has been leased to a group of investors lead by British Energy. This paper is written in historical context and therefore refers to the Bruce Site as part of OPGI. The PMLP is made up of five elements: 1) process control, 2) change control, 3) worker feedback, 4) program performance metrics, and 5) deferral module. A PMLP software tool, originally applied to Duke Energy nuclear plants, was enhanced and customized specifically for the OPGI PMLP, and then implemented at all three of OPGI's nuclear sites. The objective of the OPGI PMLP was to: Provide processes/procedures for continual optimization of all site PM tasks, Ensure effective and timely revision of PM tasks in the work management system, Ensure PM tasks remain applicable/effective at all times, Maintain and enhance PM consistency on a component, system and Site basis, Ensure that new predictive maintenance techniques are applied and integrated with the PM program, Ensure that mandated PM tasks are identified and executed, Provide a mechanism for craft feedback, Meet regulatory requirements for PM program effectiveness, and Provide PM task deferral

  7. Control-limit preventive maintenance policies for components subject to imperfect preventive maintenance and variable operational conditions

    International Nuclear Information System (INIS)

    You Mingyi; Li Hongguang; Meng Guang

    2011-01-01

    This paper develops two component-level control-limit preventive maintenance (PM) policies for systems subject to the joint effect of partial recovery PM acts (imperfect PM acts) and variable operational conditions, and investigates the properties of the proposed policies. The extended proportional hazards model (EPHM) is used to model the system failure likelihood influenced by both factors. Several numerical experiments are conducted for policy property analysis, using real lifetime and operational condition data and typical characterization of imperfect PM acts and maintenance durations. The experimental results demonstrate the necessity of considering both factors when they do exist, characterize the joint effect of the two factors on the performance of an optimized PM policy, and explore the influence of the loading sequence of time-varying operational conditions on the performance of an optimized PM policy. The proposed policies extend the applicability of PM optimization techniques.

  8. Preventive maintenance basis: Volume 19 -- HVAC -- chillers and compressors. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to HVAC -- Chillers and Compressors. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  9. Integrated preventive maintenance and production decisions for imperfect processes

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Nahas, Nabil; Ben-Daya, Mohamed

    2016-01-01

    This paper integrates production, maintenance, and quality for an imperfect process in a multi-period multi-product capacitated lot-sizing context. The production system is modeled as an imperfect machine, whose the status is considered to be either in-control or out-of-control. When the machine is out of control, it produces a fraction of nonconforming items. During each period, this machine is inspected and imperfect preventive maintenance activities are simultaneously performed to reduce its age, proportional to the preventive maintenance level. The objective is to minimize the total cost, while satisfying the demand for all products. Our optimization model allows for a joint selection of the optimal values of production plan, and the maintenance policy, while taking into account quality related costs. A solution algorithm is developed and illustrative numerical examples are presented. It is found that the increase in PM level leads to reductions in quality control costs. Furthermore, if the cost of performing PM is high to the point where it is not compensated for by reductions in the quality related costs, then performing PM is not justifiable. Finally, using non-periodic preventive maintenance with the possibility of different preventive maintenance levels may result in an improvement of the total cost. - Highlights: • We integrate production, maintenance, and quality. • We evaluate all the expected costs. • Our model allows for a joint selection of the optimal values. • A solution algorithm is developed. • Increasing PM level will decrease quality control costs.

  10. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  11. Preventive maintenance basis: Volume 37 -- Main turbine EHC hydraulics. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-11-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to the main turbine EHC hydraulic fluid and associated components. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  12. Preventive maintenance basis: Volume 1 -- Air-operated valves. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. This document provides a program of PM tasks suitable for application to Air Operated Valves (AOV's) in nuclear power plants. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  13. Preventive maintenance basis: Volume 21 -- HVAC, air handling equipment. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 21 of the report provides a program of PM tasks suitable for application to HVAC-Air Handling Equipment. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  14. Preventive maintenance basis: Volume 15 -- Rotary screw air compressors. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 15 of the report provides a program of PM tasks suitable for application to rotary screw air compressors in nuclear power plants. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  15. An optimal dynamic interval preventive maintenance scheduling for series systems

    International Nuclear Information System (INIS)

    Gao, Yicong; Feng, Yixiong; Zhang, Zixian; Tan, Jianrong

    2015-01-01

    This paper studies preventive maintenance (PM) with dynamic interval for a multi-component system. Instead of equal interval, the time of PM period in the proposed dynamic interval model is not a fixed constant, which varies from interval-down to interval-up. It is helpful to reduce the outage loss on frequent repair parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency, when compared to a periodic PM scheme. According to the definition of dynamic interval, the reliability of system is analyzed from the failure mechanisms of its components and the different effects of non-periodic PM actions on the reliability of the components. Following the proposed model of reliability, a novel framework for solving the non-periodical PM schedule with dynamic interval based on the multi-objective genetic algorithm is proposed. The framework denotes the strategies include updating strategy, deleting strategy, inserting strategy and moving strategy, which is set to correct the invalid population individuals of the algorithm. The values of the dynamic interval and the selections of PM action for the components on every PM stage are determined by achieving a certain level of system availability with the minimum total PM-related cost. Finally, a typical rotary table system of NC machine tool is used as an example to describe the proposed method. - Highlights: • A non-periodic preventive maintenance scheduling model is proposed. • A framework for solving the non-periodical PM schedule problem is developed. • The interval of non-periodic PM is flexible and schedule can be better adjusted. • Dynamic interval leads to more efficient solutions than fixed interval does

  16. Joint optimization of production scheduling and machine group preventive maintenance

    International Nuclear Information System (INIS)

    Xiao, Lei; Song, Sanling; Chen, Xiaohui; Coit, David W.

    2016-01-01

    Joint optimization models were developed combining group preventive maintenance of a series system and production scheduling. In this paper, we propose a joint optimization model to minimize the total cost including production cost, preventive maintenance cost, minimal repair cost for unexpected failures and tardiness cost. The total cost depends on both the production process and the machine maintenance plan associated with reliability. For the problems addressed in this research, any machine unavailability leads to system downtime. Therefore, it is important to optimize the preventive maintenance of machines because their performance impacts the collective production processing associated with all machines. Too lengthy preventive maintenance intervals may be associated with low scheduled machine maintenance cost, but may incur expensive costs for unplanned failure due to low machine reliability. Alternatively, too frequent preventive maintenance activities may achieve the desired high reliability machines, but unacceptably high scheduled maintenance cost. Additionally, product scheduling plans affect tardiness and maintenance cost. Two results are obtained when solving the problem; the optimal group preventive maintenance interval for machines, and the assignment of each job, including the corresponding start time and completion time. To solve this non-deterministic polynomial-time problem, random keys genetic algorithms are used, and a numerical example is solved to illustrate the proposed model. - Highlights: • Group preventive maintenance (PM) planning and production scheduling are jointed. • Maintenance interval and assignment of jobs are decided by minimizing total cost. • Relationships among system age, PM, job processing time are quantified. • Random keys genetic algorithms (GA) are used to solve the NP-hard problem. • Random keys GA and Particle Swarm Optimization (PSO) are compared.

  17. Preventive maintenance basis: Volume 24 -- Battery -- flooded lead-acid (lead-calcium, lead antimony, plante). Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. This document provides a program of preventive maintenance (PM) tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, system engineers, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  18. Stress-reducing preventive maintenance model for a unit under stressful environment

    International Nuclear Information System (INIS)

    Park, J.H.; Chang, Woojin; Lie, C.H.

    2012-01-01

    We develop a preventive maintenance (PM) model for a unit operated under stressful environment. The PM model in this paper consists of a failure rate model and two cost models to determine the optimal PM scheduling which minimizes a cost rate. The assumption for the proposed model is that stressful environment accelerates the failure of the unit and periodic maintenances reduce stress from outside. The failure rate model handles the maintenance effect of PM using improvement and stress factors. The cost models are categorized into two failure recognition cases: immediate failure recognition and periodic failure detection. The optimal PM scheduling is obtained by considering the trade-off between the related cost and the lifetime of a unit in our model setting. The practical usage of our proposed model is tested through a numerical example.

  19. A comprehensive approach to RCM-based preventive maintenance program development

    International Nuclear Information System (INIS)

    Hall, B.E.; Davis, T.; Pennington, A.J.

    1988-01-01

    In late 1986, Public Service Electric and Gas Company (PSE ampersand G) concluded that to support its vision and strategic planning it would be necessary to develop a consistent approach to maintenance for all nuclear units at the artificial island. General Physics Corporation was selected to lead a consultant team to support full-scale development of a preventive maintenance (PM) program for Salem and Hope Creek generating stations based on a reliability-centered maintenance (RCM) approach. RCM was selected because it represents a systematic approach to developing a PM program that provides a logical, consistent, and traceable methodology and produces a well-documented engineering basis for the program. Early in 1987, primary objectives for the PM program were defined. The Phase I tasks addressed key programmatic areas such as maintenance philosophy, procedures, condition monitoring, performance trending, equipment failure data base, ogranization, PM program effectiveness evaluation, RCM process, reliability/availability modeling, information management, training, spare parts, software/hardware, and commitments. Phase I of the PM program development project was completed in January 1988. Highlights of the Phase I work and the PM program manual are described

  20. An evaluation of the Browns Ferry Nuclear Plant preventive maintenance program based on reliability centered maintenance analysis

    International Nuclear Information System (INIS)

    McCullough, C.L.; McCullough, C.A.

    1989-01-01

    Reliability centered maintenance (RCM) techniques were used to support a preventative maintenance (PM) upgrade program (PMUP) performed at TVA Browns Ferry Nuclear Plant (BFNP). The purpose of the RCM analysis was to identify critical equipment based on risk and economic importance and to evaluate the PM activities applicable to that equipment. The analysis may be conveniently divided into three steps, which will be outlined in the Approach section of this paper. The net benefit of the RCM approach was a prioritization of the focus of the PM upgrade program so that plant components receive attention proportional to their importance, and assurance that PM activities properly address the most likely component failure causes

  1. Preventive maintenance at the Forsmark Nuclear Power Plant

    International Nuclear Information System (INIS)

    Danielsson, H.

    1985-01-01

    The maintenance system at the Forsmark Nuclear Power Plant began in 1975, and was drawn up in co-operation with other power stations within the control of the Swedish State Power Board. Preventive maintenance (PM) is part of the system and has been in operation since 1978. Great efforts have been made to build up the system and to gather input data. Since 1981, the system has been in continuous use; follow-ups and system and quality improvements in database contents have been carried out. Great effort has also been devoted to maintaining a high quality of database contents and to the interplay between the different PM measures. We believe that PM plays an important role in the safety and economic operation of the power station and that it is essential that interest in PM should exist at all levels of the power company. (author)

  2. Preventive maintenance basis: Volume 16 -- Power operated relief valves, solenoid actuated. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. This volume 16 of the report provides a program of PM tasks suitable for application to power operated relief valves (PORV's) that are solenoid actuated. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  3. A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty

    International Nuclear Information System (INIS)

    Su, Chun; Wang, Xiaolin

    2016-01-01

    In practice, customers can decide whether to buy an extended warranty or not, at the time of item sale or at the end of the basic warranty. In this paper, by taking into account the moments of customers purchasing two-dimensional extended warranty, the optimization of imperfect preventive maintenance for repairable items is investigated from the manufacturer's perspective. A two-dimensional preventive maintenance strategy is proposed, under which the item is preventively maintained according to a specified age interval or usage interval, whichever occurs first. It is highlighted that when the extended warranty is purchased upon the expiration of the basic warranty, the manufacturer faces a two-stage preventive maintenance optimization problem. Moreover, in the second stage, the possibility of reducing the servicing cost over the extended warranty period is explored by classifying customers on the basis of their usage rates and then providing them with customized preventive maintenance programs. Numerical examples show that offering customized preventive maintenance programs can reduce the manufacturer's warranty cost, while a larger saving in warranty cost comes from encouraging customers to buy the extended warranty at the time of item sale. - Highlights: • A two-dimensional PM strategy is investigated. • Imperfect PM strategy is optimized by considering both two-dimensional BW and EW. • Customers are categorized based on their usage rates throughout the BW period. • Servicing cost of the EW is reduced by offering customized PM programs. • Customers buying the EW at the time of sale is preferred for the manufacturer.

  4. Preventative maintenance of straddle carriers

    Directory of Open Access Journals (Sweden)

    Si Li

    2015-04-01

    Objectives: The purpose of this industry-driven study is to model preventative maintenance (PM influences on the operational effectiveness of straddle carriers. Method: The study employs historical data consisting of 21 273 work orders covering a 27-month period. Two models are developed, both of which forecast influences of PM regimes for different types of carrier. Results: The findings of the study suggest that the reliability of the straddle fleet decreases with increased intervals of PM services. The study also finds that three factors – namely resources, number of new straddles, and the number of new lifting work centres – influence the performances of straddles. Conclusion: The authors argue that this collaborative research exercise makes a significant contribution to existing supply chain management literature, particularly in the area of operations efficiency. The study also serves as an avenue to enhance relevant management practice.

  5. Optimal preventive maintenance and repair policies for multi-state systems

    International Nuclear Information System (INIS)

    Sheu, Shey-Huei; Chang, Chin-Chih; Chen, Yen-Luan; George Zhang, Zhe

    2015-01-01

    This paper studies the optimal preventive maintenance (PM) policies for multi-state systems. The scheduled PMs can be either imperfect or perfect type. The improved effective age is utilized to model the effect of an imperfect PM. The system is considered as in a failure state (unacceptable state) once its performance level falls below a given customer demand level. If the system fails before a scheduled PM, it is repaired and becomes operational again. We consider three types of major, minimal, and imperfect repair actions, respectively. The deterioration of the system is assumed to follow a non-homogeneous continuous time Markov process (NHCTMP) with finite state space. A recursive approach is proposed to efficiently compute the time-dependent distribution of the multi-state system. For each repair type, we find the optimal PM schedule that minimizes the average cost rate. The main implication of our results is that in determining the optimal scheduled PM, choosing the right repair type will significantly improve the efficiency of the system maintenance. Thus PM and repair decisions must be made jointly to achieve the best performance

  6. Where does “whichever occurs first” hold for preventive maintenance modelings?

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Liu, Hu-Chen; Nakagawa, Toshio

    2015-01-01

    The purpose of this paper is to observe where the classical assumption “whichever occurs first” holds for preventive maintenance (PM) modelings. We firstly take up a bivariate maintenance policy where “whichever occurs first” and the newly proposed “whichever occurs last” are respectively used. Modification of PM performance is introduced into modelings to avoid interruptions of job executions, that is, PMs are done only at the end of working cycles. From the points of performability and maintenance cost, we secondly compare the optimized “first” and “last” policies in detail and find two critical points of comparisons analytically. Further, by comparing the “first” and “last” policies with the standard maintenance, modified PM costs are obtained to observe whether it is easy to save PM cost for “whichever occurs first”. For a trivariate maintenance policy, we thirdly propose an entirely new assumption “whichever occurs middle” and give another one model that considers both assumptions of “first” and “last”. We analyze maintenance probabilities for each model and then obtain directly their expected maintenance cost rates for further studies. - Highlights: • A bivariate maintenance policy based on “whichever occurs first” is improved. • Two comparisons of “whichever occurs first and last” are made. • Modified maintenance costs are obtained to observe which policy could save more costs. • New assumption “whichever occurs middle” for the trivariate maintenances is proposed. • One policy is modeled by considering both assumptions of “first” and “last”

  7. Reusable rocket engine preventive maintenance scheduling using genetic algorithm

    International Nuclear Information System (INIS)

    Chen, Tao; Li, Jiawen; Jin, Ping; Cai, Guobiao

    2013-01-01

    This paper deals with the preventive maintenance (PM) scheduling problem of reusable rocket engine (RRE), which is different from the ordinary repairable systems, by genetic algorithm. Three types of PM activities for RRE are considered and modeled by introducing the concept of effective age. The impacts of PM on all subsystems' aging processes are evaluated based on improvement factor model. Then the reliability of engine is formulated by considering the accumulated time effect. After that, optimization model subjected to reliability constraint is developed for RRE PM scheduling at fixed interval. The optimal PM combination is obtained by minimizing the total cost in the whole life cycle for a supposed engine. Numerical investigations indicate that the subsystem's intrinsic reliability characteristic and the improvement factor of maintain operations are the most important parameters in RRE's PM scheduling management

  8. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  9. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Binrong

    2017-01-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  10. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xuejuan; Wang, Binrong

    2017-07-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  11. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  12. Preventive maintenance basis: Volume 10 -- High voltage electric motors (5 kV and greater). Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 10 of the report provides a program of PM tasks suitable for application to high voltage (5kV and greater) electric motors in nuclear power plants. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs. Reactor Coolant Pumps motors (RCP's) are not excluded from this report in so far as good PM practices for motors of the appropriate class are concerned. However, the special auxiliary equipment normally associated with RCP's has not been included. Consequently, this report does not provide a complete PM program for RCP's. Industry and vendor programs for RCP's should be consulted for complete definition of RCP motor PM programs

  13. The impact of preventive maintenance practices on manufacturing performance: A proposed model for SMEs in Malaysia

    Science.gov (United States)

    Lazim, Halim Mad; Taib, Che Azlan; Lamsali, Hendrik; Saleh, Mohamed Najib; Subramaniam, Chandrakantan

    2016-08-01

    Preventive maintenance (PM) plays important role to avoid or mitigate potential stoppages and disruptions of equipment or machinery from occurring in daily operations. PM emphasized total employee involvement and it is important for companies as well as Small and Medium Sized Enterprises (SMEs). SME sectors contribution to the Malaysian economy makes up 95% of the total manufacturers, however PM remain relatively lacking. The ability, reliability and effective maintenance management is highly important in order to achieve desired manufacturing performance. Therefore, organizational capability in planning, controlling, implementing and monitoring PM activities is important. Furthermore, empirical evidence on the potential impact of PM practices towards manufacturing performance with organizational capability as a moderating effect is still limited and indecisive. Henceforth, this paper aims to explore and investigate potential relationships between PM practices and manufacturing performance moderated by organizational capability in the contact of Malaysian SMEs in the manufacturing sector. Correspondently, the study intends to propose a new research framework and hypotheses to examine the abovementioned relationships. The proposed framework includes PM team, PM strategy and planned maintenance as the determinants, while organizational capability serves as the moderating variable. Manufacturing performance will be viewed in terms of innovation and financial factors. Proposed research direction and conclusion are discussed at the end of the study.

  14. Determining optimal preventive maintenance interval for component of Well Barrier Element in an Oil & Gas Company

    Science.gov (United States)

    Siswanto, A.; Kurniati, N.

    2018-04-01

    An oil and gas company has 2,268 oil and gas wells. Well Barrier Element (WBE) is installed in a well to protect human, prevent asset damage and minimize harm to the environment. The primary WBE component is Surface Controlled Subsurface Safety Valve (SCSSV). The secondary WBE component is Christmas Tree Valves that consist of four valves i.e. Lower Master Valve (LMV), Upper Master Valve (UMV), Swab Valve (SV) and Wing Valve (WV). Current practice on WBE Preventive Maintenance (PM) program is conducted by considering the suggested schedule as stated on manual. Corrective Maintenance (CM) program is conducted when the component fails unexpectedly. Both PM and CM need cost and may cause production loss. This paper attempts to analyze the failure data and reliability based on historical data. Optimal PM interval is determined in order to minimize the total cost of maintenance per unit time. The optimal PM interval for SCSSV is 730 days, LMV is 985 days, UMV is 910 days, SV is 900 days and WV is 780 days. In average of all components, the cost reduction by implementing the suggested interval is 52%, while the reliability is improved by 4% and the availability is increased by 5%.

  15. Integrating the sequence dependent setup time open shop problem and preventive maintenance policies

    Directory of Open Access Journals (Sweden)

    K. Naboureh

    2016-09-01

    Full Text Available In most industrial environments, it is usually considered that machines are accessible throughout the planning horizon, but in real situation, machines may be unavailable due to a scheduled preventive maintenance where the periods of unavailability are known in advance. The main idea of this paper is to consider different preventive maintenance policies on machines regarding open shop scheduling problem (OSSP with sequence dependent setup times (SDST using immune algorithm. The preventive maintenance (PM policies are planned for maximizing availability of machines or keeping minimum level of reliability through the production horizon. The objective function of the paper is to minimize makespan. In total, the proposed algorithm extensively is compared with six adaptations of existing heuristic and meta-heuristic methods for the problem through data sets from benchmarks based on Taillard’s instances with some adjustments. The results show that the proposed algorithm outperforms other algorithms for this problem.

  16. Are green building features safe for preventive maintenance workers? Examining the evidence.

    Science.gov (United States)

    Omar, Mohamed Shamun; Quinn, Margaret M; Buchholz, Bryan; Geiser, Ken

    2013-04-01

    Many newly constructed green buildings (GB) are certified using the United States Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) rating system for new construction and major renovation which focuses on architectural and mechanical design to conserve energy, reduce environmental harm, and enhance indoor quality for occupants. This study evaluated the preventive maintenance (PM) worker occupational safety and health (OSH) risks related to the design of GB. PM job hazard analyses (JHA) were performed on the tasks required to operate and maintain five GB features selected from 13 LEED certified GB. A 22-item JHA and OSH risk scoring system were developed. Potentially serious OSH hazards included: green roofs made of slippery material without fall protection; energy recovery wheels and storm water harvesting systems in confined spaces; skylights without guard rails; and tight geothermal well mechanical rooms constraining safe preventive practices. GB can present PM OSH risks and these should be eliminated in the building design phase. Copyright © 2013 Wiley Periodicals, Inc.

  17. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  18. Non-periodic preventive maintenance with reliability thresholds for complex repairable systems

    International Nuclear Information System (INIS)

    Lin, Zu-Liang; Huang, Yeu-Shiang; Fang, Chih-Chiang

    2015-01-01

    In general, a non-periodic condition-based PM policy with different condition variables is often more effective than a periodic age-based policy for deteriorating complex repairable systems. In this study, system reliability is estimated and used as the condition variable, and three reliability-based PM models are then developed with consideration of different scenarios which can assist in evaluating the maintenance cost for each scenario. The proposed approach provides the optimal reliability thresholds and PM schedules in advance by which the system availability and quality can be ensured and the organizational resources can be well prepared and managed. The results of the sensitivity anlysis indicate that PM activities performed at a high reliability threshold can not only significantly improve the system availability but also efficiently extend the system lifetime, although such a PM strategy is more costly than that for a low reliabiltiy threshold. The optimal reliability threshold increases along with the number of PM activities to prevent future breakdowns caused by severe deterioration, and thus substantially reduces repair costs. - Highlights: • The PM problems for repairable deteriorating systems are formulated. • The structural properties of the proposed PM models are investigated. • The corresponding algorithms to find the optimal PM strategies are provided. • Imperfect PM activities are allowed to reduce the occurences of breakdowns. • Provide managers with insights about the critical factors in the planning stage

  19. EPRI spearheads generic PM recommendations for infrastructure equipment

    International Nuclear Information System (INIS)

    Worledge, David H.; Hinchcliffe, Glenn R.; Benak, Mark S.; Bridges, Martin

    2007-01-01

    All companies have at their core a vast amount of similar equipment that would benefit from solid preventive maintenance (PM) recommendations that are generic and easily adapted to meet operational conditions. The re-emergence of PM optimization methods like Reliability Centered Maintenance, further illustrates that companies in all industries recognize the positive influence that a well-focused maintenance program has on the corporate bottom line. The Electric Power Research Institute (EPRI) has long been a leader in providing universally adaptable maintenance solutions to meet the evolving needs of its membership. Nearly ten years ago, EPRI began developing the PM Basis Database, a one-of-a-kind repository of PM recommendations for basic infrastructure components (such as pumps, motors, valves, compressors), derived from equipment experts. EPRI has now made available this comprehensive body of knowledge to all industries. This paper will explore the origins and structure of the database, how these generic PM recommendations benefit every industry, and how they may be obtained. (author)

  20. A preventive maintenance model for leased equipment subject to internal degradation and external shock damage

    International Nuclear Information System (INIS)

    Zhou, Xiaojun; Wu, Changjie; Li, Yanting; Xi, Lifeng

    2016-01-01

    A periodic preventive maintenance modeling method is proposed for leased equipment with continuous internal degradation and stochastic external shock damage considered simultaneously, which can facilitate the equipment lessor to optimize the maintenance schedule for the same kind of equipment rented by different lessees. A novel interactive mechanism between the continuous internal degradation and the stochastic external shock damage is established on the hazard rate of the equipment with integrating the imperfect effect of maintenance. Two improvement factors are defined for the modeling of imperfect maintenance. The number of failures resulting from internal degradation and from external shocks are both mathematically deduced based on this interactive mechanism. The optimal preventive maintenance scheme is obtained by minimizing the cumulative maintenance cost throughout the lease period. Numerical example shows that the proposed preventive maintenance model not only can reflect the reliability status of the equipment but also can clearly distinguish between the impact from internal degradation and that from external shocks. - Highlights: • We propose an imperfect periodic preventive maintenance model for leased equipment. • It can distinguish between the impact from internal degradation and that from external shocks. • An internal–external interactive mechanism is proposed. • Two improvement factors are introduced into the modeling of imperfect maintenance. • The model is helpful for the PM scheduling of the same equipment rented by different lessees.

  1. Joint Optimization of Economic Production Quantity and Preventive Maintenance with Considering Multi-Products and Reserve Time

    OpenAIRE

    Liu, Xuejuan; Wang, Binrong

    2017-01-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cy...

  2. Analytical method for optimization of maintenance policy based on available system failure data

    International Nuclear Information System (INIS)

    Coria, V.H.; Maximov, S.; Rivas-Dávalos, F.; Melchor, C.L.; Guardado, J.L.

    2015-01-01

    An analytical optimization method for preventive maintenance (PM) policy with minimal repair at failure, periodic maintenance, and replacement is proposed for systems with historical failure time data influenced by a current PM policy. The method includes a new imperfect PM model based on Weibull distribution and incorporates the current maintenance interval T 0 and the optimal maintenance interval T to be found. The Weibull parameters are analytically estimated using maximum likelihood estimation. Based on this model, the optimal number of PM and the optimal maintenance interval for minimizing the expected cost over an infinite time horizon are also analytically determined. A number of examples are presented involving different failure time data and current maintenance intervals to analyze how the proposed analytical optimization method for periodic PM policy performances in response to changes in the distribution of the failure data and the current maintenance interval. - Highlights: • An analytical optimization method for preventive maintenance (PM) policy is proposed. • A new imperfect PM model is developed. • The Weibull parameters are analytically estimated using maximum likelihood. • The optimal maintenance interval and number of PM are also analytically determined. • The model is validated by several numerical examples

  3. PREVENTIVE MAINTENANCE. HONEYWELL PLANNING GUIDE.

    Science.gov (United States)

    Honeywell, Inc., Minneapolis, Minn.

    THIS HONEYWELL PAMPHLET DISCUSSES SOME ASPECTS OF PREVENTIVE MAINTENANCE OF AUTOMATIC CONTROLS, HEATING, VENTILATING, AND AIR CONDITIONING, AND COMPARES IN-PLANT WITH CONTRACT SERVICE, CONCLUDING THAT CONTRACT SERVICE IS PREFERABLE AND DESCRIBING A NUMBER OF MAINTENANCE PLANS WHICH THEY FURNISH. PREVENTIVE MAINTENANCE PROVIDES--(1) MORE EFFICIENT…

  4. Status of the reliability centered maintenance program at Ontario Hydro's Bruce 'A' Nuclear Division

    International Nuclear Information System (INIS)

    Khan, I.

    1995-01-01

    Bruce A started a preventive maintenance (PM) quality improvement program in August of 1991. This initiative was taken to address the concerns expressed by the AECB and the Peer Audits finding. The concerns were on the quality of the Bruce A PM Program and its execution in the field. Reliability Centered Maintenance (RCM) analysis was selected as the PM program quality improvement and optimization technique. Therefore, RCM became a key component of Bruce A's Integrated PM program and maintenance strategy. As a result of RCM implementation, and improvements in the work planning and scheduling process, Bruce A is seeing downward trends in the corrective maintenance work load, maintenance preventable forced outages, overdue/missed PM tasks and corrective maintenance backlog. Control Room Operators have reported observing an improvement in systems and equipment response to transients. Other benefits include a documented, controlled and traceable PM program. In addition, the team approach required by RCM has started to improve staff confidence in the PM program which, in turn, is improving the compliance with the PM program. (author)

  5. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  6. A preventive maintenance model with a two-level inspection policy based on a three-stage failure process

    International Nuclear Information System (INIS)

    Wang, Wenbin; Zhao, Fei; Peng, Rui

    2014-01-01

    Inspection is always an important preventive maintenance (PM) activity and can have different depths and cover all or part of plant systems. This paper introduces a two-level inspection policy model for a single component plant system based on a three-stage failure process. Such a failure process divides the system′s life into three stages: good, minor defective and severe defective stages. The first level of inspection, the minor inspection, can only identify the minor defective stage with a certain probability, but can always reveal the severe defective stage. The major inspection can however identify both defective stages perfectly. Once the system is found to be in the minor defective stage, a shortened inspection interval is adopted. If however the system is found to be in the severe defective stage, we may delay the maintenance action if the time to the next planned PM window is less than a threshold level, but otherwise, replace immediately. This corresponds to the well adopted maintenance policy in practice such as periodic inspections with planned PMs. A numerical example is presented to demonstrate the proposed model by comparing with other models. - Highlights: • The system′s deterioration goes through a three-stage process, namely, normal, minor defective and severe defective. • Two levels of inspections are proposed, e.g., minor and major inspections. • Once the minor defective stage is found, instead of taking a maintenance action, a shortened inspection interval is recommended. • When the severe defective stage is found, we delay the maintenance according to the threshold to the next PM. • The decision variables are the inspection intervals and the threshold to PM

  7. Optimal maintenance policy for a system subject to damage in a discrete time process

    International Nuclear Information System (INIS)

    Chien, Yu-Hung; Sheu, Shey-Huei; Zhang, Zhe George

    2012-01-01

    Consider a system operating over n discrete time periods (n=1, 2, …). Each operation period causes a random amount of damage to the system which accumulates over time periods. The system fails when the cumulative damage exceeds a failure level ζ and a corrective maintenance (CM) action is immediately taken. To prevent such a failure, a preventive maintenance (PM) may be performed. In an operation period without a CM or PM, a regular maintenance (RM) is conducted at the end of that period to maintain the operation of the system. We propose a maintenance policy which prescribes a PM when the accumulated damage exceeds a pre-specified level δ ( ⁎ and N ⁎ and discuss some useful properties about them. It has been shown that a δ-based PM outperforms a N-based PM in terms of cost minimization. Numerical examples are presented to demonstrate the optimization of this class of maintenance policies.

  8. Failure Rate Prediction of Active Component Using PM Basis Database

    International Nuclear Information System (INIS)

    Kim, J. S.; Kim, H. W.; Park, J. S.; Jung, S. G.

    2011-01-01

    The safety security and efficient management of NPPs (Nuclear Power Plants) have been increased after the accident of TEPCO's Fukushima nuclear power stations. The needs for the safety and efficiency are becoming more important because about 90 percent of the NPPs all over the world are more than 20 operation years old. The preventive maintenance criteria need to be flexible, considering long-term development of the equipment performance and preventive maintenance. The PMBD (Preventive Maintenance Basis Database) program was widely used for optimization of the preventive maintenance criteria. PMBD program contains all kinds of failure mechanisms for each equipment that may occur in the power plant based on RCM(Reliability-Centered Maintenance) and numerically calculate the variation of reliability and failure rate based on PM interval changes. In this study, propriety evaluation of preventive maintenance task, cycle, technical basis for cost effective preventive maintenance strategy and an appropriate evaluation were suggested by the case application of PMBD for major components in the NPPs

  9. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  10. Complete guide to preventive and predictive maintenance

    CERN Document Server

    Levitt, Joel

    2011-01-01

    This book shares the best practices, mistakes, victories, and essential steps for success which the author has gleaned from working with countless organizations. Unlike other books that only focus on the engineering issues (task lists) or management issues (CMMS), this in-depth resource is the first to give true emphasize to the four aspects of success in preventive maintenance systems - engineering, management, economic, and psychological - thereby enabling readers to have a balanced view and understanding of what is happening in their organizations. Additionally, it blends concrete actionable steps and structures with the theory behind the steps. It includes check sheets, history of PM, stories, photographs, and case histories. It contains a glossary of terms. It provides sample task lists for a variety of equipment with some of the logic behind each task. It offers templates for developing your own tasking. It includes protocols for detailed economic analysis with examples.

  11. Maintenance Management Support Systems for component aging estimation at nuclear power plants

    International Nuclear Information System (INIS)

    Shimizu, Shunichi; Ando, Yasumasa; Morioka, Toshihiko; Okuzumi, Naoaki

    1991-01-01

    Maintenance Management Support Systems (MMSSs) for nuclear power plants have been developed using component aging estimation methods and decision tree analysis for maintenance planning. The former evaluates actual component reliability through statistical analysis on field maintenance data. The latter provides preventive maintenance (PM) planning guidance using heuristic expert knowledge and estimated reliability parameters. The following aspects have been investigated: (1) A systematic and effective method of managing components/parts design information and field maintenance data (2) A method for estimating component aging based on a statistical analysis of field maintenance data (3) A method for providing PM planning guidance using estimated component reliability/performance parameters and decision tree analysis. Based on these investigations, two MMSSs were developed. One deals with 'general maintenance data', which are common to all component types and are amenable to common data handling. The other system deals with 'specific maintenance data', which are specific to an individual component type. Both systems provide PM planning guidance for PM cycles propriety and the PM work priority. The function of these systems were verified using simulated maintenance data. (author)

  12. On preventive maintenance policy of a critical reliability level for system subject to degradation

    International Nuclear Information System (INIS)

    Zhao, Y.X.

    2003-01-01

    Conventional preventive maintenance (PM) policies generally hold same time interval for PM actions and are often applied with known failure modes. The same time interval will give unavoidably decreasing reliabilities at the PM actions for degradation system with imperfect PM effect and the known failure modes may be inaccurate in practice. Therefore, field managers would prefer policy with an acceptable reliability level to keep system often at a good state. A PM policy with the critical reliability level is presented to address the preference of field managers. Through assuming that system after a PM action starts a new failure process, a parameter so-called degradation ratio is introduced to represent the imperfect effect. The policy holds a law that there is same number of failures in the time intervals of various PM cycles, and same degradation ratio for the system reliability or benefit parameters such as the optimal time intervals and the hazard rates between the neighboring PM cycles. This law is valid to any of the failure modes that could be appropriately referred as a 'general isodegrading model', and the degradation ratio as a 'general isodegrading ratio'. In addition, life cycle availability and cost functions are derived for system with the policy. An analysis of the field data of a loading and unloading machine indicates that the reliability, availability and cost in life cycle might be well modeled by the present theory and approach

  13. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  14. Optimization of maintenance policy using the proportional hazard model

    Energy Technology Data Exchange (ETDEWEB)

    Samrout, M. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: mohamad.el_samrout@utt.fr; Chatelet, E. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: chatelt@utt.fr; Kouta, R. [M3M Laboratory, University of Technology of Belfort Montbeliard (France); Chebbo, N. [Industrial Systems Laboratory, IUT, Lebanese University (Lebanon)

    2009-01-15

    The evolution of system reliability depends on its structure as well as on the evolution of its components reliability. The latter is a function of component age during a system's operating life. Component aging is strongly affected by maintenance activities performed on the system. In this work, we consider two categories of maintenance activities: corrective maintenance (CM) and preventive maintenance (PM). Maintenance actions are characterized by their ability to reduce this age. PM consists of actions applied on components while they are operating, whereas CM actions occur when the component breaks down. In this paper, we expound a new method to integrate the effect of CM while planning for the PM policy. The proportional hazard function was used as a modeling tool for that purpose. Interesting results were obtained when comparison between policies that take into consideration the CM effect and those that do not is established.

  15. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  16. Using a developed PM in order to optimize the production ...

    African Journals Online (AJOL)

    Michael Horsfall

    production productivity is preventive maintenance (PM). It helps to protect assets, increase the useful life of equipment ... Production planning models seek typically to balance the costs of .... clinker. In this work the effect of reactions contained.

  17. Optimal policies for cumulative damage models with maintenance last and first

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Qian, Cunhua; Nakagawa, Toshio

    2013-01-01

    From the economical viewpoint of several combined PM policies in reliability theory, this paper takes up a standard cumulative damage model in which the notion of maintenance last is applied, i.e., the unit undergoes preventive maintenances before failure at a planned time T, at a damage level Z, or at a shock number N, whichever occurs last. Expected cost rates are detailedly formulated, and optimal problems of two alternative policies which combine time-based with condition-based preventive maintenances are discussed, i.e., optimal T L ⁎ for N, Z L ⁎ for T, and N L ⁎ for T are rigorously obtained. Comparison methods between such maintenance last and conventional maintenance first are explored. It is determined theoretically and numerically which policy should be adopted, according to the different methods in different cases when the time-based or the condition-based PM policy is optimized.

  18. Practical considerations in developing an instrument-maintenance plan--

    International Nuclear Information System (INIS)

    Guth, M.A.S.

    1989-01-01

    The author develops a general set of considerations to explain how a consistent, well-organized, prioritized, and adequate time-allowance program plan for routine maintenance can be constructed. The analysis is supplemented with experience from the high flux isotope reactor (HFIR) at US Oak Ridge National Laboratory (ORNL). After the preventive maintenance (PM) problem was defined, the instruments on the schedule were selected based on the manufacturer's design specifications, quality-assurance requirements, prior classifications, experiences with the incidence of breakdowns or calibration, and dependencies among instruments. The effects of repair error in PM should be also studied. The HFIR requires three full-time technicians to perform both PM and unscheduled maintenance. A review is presented of concepts from queuing theory to determine anticipated breakdown patterns. In practice, the pneumatic instruments have a much longer lifetime than the electric/electronic instruments on various reactors at ORNL. Some special considerations and risk aversion in choosing a maintenance schedule

  19. A maintenance optimization model for mission-oriented systems based on Wiener degradation

    International Nuclear Information System (INIS)

    Guo, Chiming; Wang, Wenbin; Guo, Bo; Si, Xiaosheng

    2013-01-01

    Over the past few decades, condition-based maintenance (CBM) has attracted many researchers because of its effectiveness and practical significance. This paper deals with mission-oriented systems subject to gradual degradation modeled by a Wiener stochastic process within the context of CBM. For a mission-oriented system, the mission usually has constraints on availability/reliability, the opportunity for maintenance actions, and the monitoring type (continuous or discrete). Furthermore, in practice, a mission-oriented system may undertake some preventive maintenance (PM) and after such PM, the system may return to an intermediate state between an as-good-as new state and an as-bad-as old state, i.e., the PM is not perfect and only partially restores the system. However, very few CBM models integrated these mission constraints together with an imperfect nature of the PM into the course of optimizing the PM policy. This paper develops a model to optimize the PM policy in terms of the maintenance related cost jointly considering the mission constraints and the imperfect PM nature. A numerical example is presented to demonstrate the proposed model. The comparison with the simulated results and the sensitivity analysis show the usefulness of the optimization model for mission-oriented system maintenance presented in this paper.

  20. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  1. Comprehensive framework for preventive maintenance priority of medical equipment.

    Science.gov (United States)

    Saleh, Neven; Balestra, Gabriella

    2015-08-01

    Throughout the medical equipment life cycle, preventive maintenance is considered one of the most important stages that should be managed properly. However, the need for better management and control by giving a reasonable prioritization for preventive maintenance becomes essential. The purpose of this study is to develop a comprehensive framework for preventive maintenance priority of medical equipment using Quality Function Deployment (QFD) and Fuzzy Logic (FL). The quality function deployment is proposed in order to identify the most important criteria that could impact preventive maintenance priority decision; meanwhile the role of the fuzzy logic is to generate a priority index of the list of equipment considering those criteria. The model validation was carried out on 140 pieces of medical equipment belonging to two hospitals. In application, we propose to classify the priority index into five classes. The results indicate that the strong correlation existence between risk-based criteria and preventive maintenance priority decision.

  2. Application of preventive maintenance planning in a parquet ...

    African Journals Online (AJOL)

    STORAGESEVER

    2009-04-20

    Apr 20, 2009 ... Key words: Maintenance, preventive maintenance, enterprise, planning. INTRODUCTION .... There is machine introduction form on each machine. Moreover, ..... loy using total productive maintenance (TPM) approach. M.Sc.

  3. Proposing New Heuristic Approaches for Preventive Maintenance Scheduling

    Directory of Open Access Journals (Sweden)

    majid Esmailian

    2013-08-01

    Full Text Available The purpose of preventive maintenance management is to perform a series of tasks that prevent or minimize production breakdowns and improve reliability of production facilities. An important objective of preventive maintenance management is to minimize downtime of production facilities. In order to accomplish this objective, personnel should efficiently allocate resources and determine an effective maintenance schedule. Gopalakrishnan (1997 developed a mathematical model and four heuristic approaches to solve the preventive maintenance scheduling problem of assigning skilled personnel to work with tasks that require a set of corresponding skills. However, there are several limitations in the prior work in this area of research. The craft combination problem has not been solved because the craft combination is assumed as given. The craft combination problem concerns the computation of all combinations of assigning multi skilled workers to accomplishment of a particular task. In fact, determining craft combinations is difficult because of the exponential number of craft combinations that are possible. This research provides a heuristic approach for determining the craft combination and four new heuristic approach solution for the preventive maintenance scheduling problem with multi skilled workforce constraints. In order to examine the new heuristic approach and to compare the new heuristic approach with heuristic approach of Gopalakrishnan (1997, 81 standard problems have been generated based on the criterion suggested by from Gopalakrishnan (1997. The average solution quality (SQ of the new heuristic approaches is 1.86% and in old heuristic approaches is 8.32%. The solution time of new heuristic approaches are shorter than old heuristic approaches. The solution time of new heuristic approaches is 0.78 second and old heuristic approaches is 6.43 second, but the solution time of mathematical model provided by Gopalakrishnan (1997 is 152 second.

  4. Modularity Design Approach for Preventive Machine Maintenance

    Science.gov (United States)

    Ernawati, D.; Pudji, E.; Ngatilah, Y.; Handoyo, R.

    2018-01-01

    In a company, machine maintenance system will be very influential in production process activity. The company should have a scheduled engine maintenance system that does not require high costs when repairing and replacing machine parts. Modularity Design method is able to provide solutions to the engine maintenance scheduling system and can prevent fatal damage to the engine components. It can minimize the cost of repair and replacement of these machine components.The paper provides a solution to machine maintenance problems. The paper is also completed with case study of milling machines. That case studies can give us a real description about impact implementation of modularity design to prevent fatal damage to components and minimize the cost of repair and replacement of components of the machine.

  5. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  6. Solving complex maintenance planning optimization problems using stochastic simulation and multi-criteria fuzzy decision making

    International Nuclear Information System (INIS)

    Tahvili, Sahar; Österberg, Jonas; Silvestrov, Sergei; Biteus, Jonas

    2014-01-01

    One of the most important factors in the operations of many cooperations today is to maximize profit and one important tool to that effect is the optimization of maintenance activities. Maintenance activities is at the largest level divided into two major areas, corrective maintenance (CM) and preventive maintenance (PM). When optimizing maintenance activities, by a maintenance plan or policy, we seek to find the best activities to perform at each point in time, be it PM or CM. We explore the use of stochastic simulation, genetic algorithms and other tools for solving complex maintenance planning optimization problems in terms of a suggested framework model based on discrete event simulation

  7. Solving complex maintenance planning optimization problems using stochastic simulation and multi-criteria fuzzy decision making

    Energy Technology Data Exchange (ETDEWEB)

    Tahvili, Sahar [Mälardalen University (Sweden); Österberg, Jonas; Silvestrov, Sergei [Division of Applied Mathematics, Mälardalen University (Sweden); Biteus, Jonas [Scania CV (Sweden)

    2014-12-10

    One of the most important factors in the operations of many cooperations today is to maximize profit and one important tool to that effect is the optimization of maintenance activities. Maintenance activities is at the largest level divided into two major areas, corrective maintenance (CM) and preventive maintenance (PM). When optimizing maintenance activities, by a maintenance plan or policy, we seek to find the best activities to perform at each point in time, be it PM or CM. We explore the use of stochastic simulation, genetic algorithms and other tools for solving complex maintenance planning optimization problems in terms of a suggested framework model based on discrete event simulation.

  8. Optimization of the preventive maintenance plan of a series components system

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Jose A. Caldeira [Mathematical Department, Instituto Politecnico de Setubal/Escola Superior de Tecnologia de Setubal, Campus do IPS, Estefanilha, 2914-508 Setubal (Portugal)]. E-mail: jduarte@est.ips.pt; Craveiro, Joao C. Taborda A. [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal); Trigo, Tomas Pedro [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal)

    2006-04-15

    One of the most critical problems in preventive maintenance is the determination of the optimum frequency to perform preventive maintenance in equipment, in order to ensure its availability. In this paper, we propose an algorithm to solve the previous problem for equipment that exhibit linearly increasing hazard rate and constant repair rate. Based on this algorithm, we have developed another one to solve the problem of maintenance management of a series system based on preventive maintenance over the different system components. We assume that all components of the system still exhibit linearly increasing hazard rate and constant repair rate and that preventive maintenance would bring the system to the as good as new condition. We define a cost function for maintenance tasks (preventive and corrective) for the system. The algorithm calculates the interval of time between preventive maintenance actions for each component, minimizing the costs, and in such a way that the total downtime, in a certain period of time, does not exceed a predetermined value.

  9. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  10. Dynamic decision-making for reliability and maintenance analysis of manufacturing systems based on failure effects

    Science.gov (United States)

    Zhang, Ding; Zhang, Yingjie

    2017-09-01

    A framework for reliability and maintenance analysis of job shop manufacturing systems is proposed in this paper. An efficient preventive maintenance (PM) policy in terms of failure effects analysis (FEA) is proposed. Subsequently, reliability evaluation and component importance measure based on FEA are performed under the PM policy. A job shop manufacturing system is applied to validate the reliability evaluation and dynamic maintenance policy. Obtained results are compared with existed methods and the effectiveness is validated. Some vague understandings for issues such as network modelling, vulnerabilities identification, the evaluation criteria of repairable systems, as well as PM policy during manufacturing system reliability analysis are elaborated. This framework can help for reliability optimisation and rational maintenance resources allocation of job shop manufacturing systems.

  11. Study on application of safety checklist in preventive maintenance activities

    International Nuclear Information System (INIS)

    Shi Jin; Chen Song; Liu Jingquan

    2013-01-01

    The paper describes the principles and the characteristics of safety checklist as a risk evaluation method. Examples of application of safety checklists to preventive maintenance activities such as criteria comparison and checkup items in place in nuclear power plants are illustrated in details with issues appeared in the checklist establishment. Checklist has a good application in the RCM analysis or in the actual preventive maintenance program for Chashma Nuclear Power Plant indicated by concrete instances. In the light of safety checklist which is used to sustain preventive maintenance as a simple and applicable risk analysis approach, we can get deep knowledge of risks of nuclear power plant to perfect preventive maintenance activities. (authors)

  12. Imperfect Preventive Maintenance Model Study Based On Reliability Limitation

    Directory of Open Access Journals (Sweden)

    Zhou Qian

    2016-01-01

    Full Text Available Effective maintenance is crucial for equipment performance in industry. Imperfect maintenance conform to actual failure process. Taking the dynamic preventive maintenance cost into account, the preventive maintenance model was constructed by using age reduction factor. The model regards the minimization of repair cost rate as final target. It use allowed smallest reliability as the replacement condition. Equipment life was assumed to follow two parameters Weibull distribution since it was one of the most commonly adopted distributions to fit cumulative failure problems. Eventually the example verifies the rationality and benefits of the model.

  13. Preventive Maintenance. FMO: Fundamentals of Machine Operation. Third Edition.

    Science.gov (United States)

    Hathaway, Louis

    This text is intended to provide students with basic information on conducting preventive maintenance on agricultural machinery. The following topics are covered in the individual chapters: the importance of preventive maintenance and recommended service intervals; engine intake and exhaust systems (air cleaners, turbochargers, intake and exhaust…

  14. MINIMASI BIAYA PERAWATAN DENGAN MENGGUNAKAN METODE PREVENTIVE MAINTENANCE POLICY

    Directory of Open Access Journals (Sweden)

    Much Djunaidi

    2012-12-01

    Full Text Available PT. Primatexco Indonesia merupakan perusahaan tekstil dengan produk benang tenun, kain, printing, dan waste. Di PT. Primatexco Indonesia terdapat bagian blowing yang bertugas menyuplai bahan baku untuk proses produksi. Artikel ini membahas mengenai alternatif jadwal perbaikan maupun perawatan dengan biaya terkecil untuk komponen mesin blowing. Dengan menghitung biaya perawatan untuk repair policy dan dibandingkan dengan biaya preventive maintenance policy, maka akan didapatkan jadwal perbaikan maupun perawatan yang optimal. Dari hasil perhitungan, diusulkan jadwal perawatan mengikuti kebijakan repair untuk kerusakan komponen klasifikasi A. Untuk kerusakan komponen klasifikasi B diterapkan kebijakan preventive maintenance setiap 5 bulan. Dan untuk kerusakan komponen klasifikasi C diterapkan kebijakan preventive maintenance setiap 7 bulan.

  15. Preventive maintenance technology for nuclear power stations

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo

    1992-01-01

    With the increase of the number of nuclear power plants in operation and the number of years of operation, the improvement of reliability and the continuation of safe operation have become more important, and the expectation for preventive maintenance technology has also heightened. The maintenance of Japanese nuclear power plants is based on the time schedule maintenance mainly by the regular inspection carried out every year, but the monitoring of the conditions of various machinery and equipment in operation has been performed widely. In this report, the present state of checkup and inspection technologies and the monitoring and diagnostic technologies for operational condition, which are the key technologies of preventive maintenance, are described. As the checkup and inspection technologies, ultrasonic flow detection technology, phased array technology, Amplituden und Laufzeit Orts Kurven method and X-ray CT, and as the monitoring and diagnostic technologies for operational condition, the diagnosis support system for BWR plants 'PLADIS', those for rotary machines, those for turbogenerators, those for solenoid valves, the mechanization of patrol works and the systematizing technology are reported. (K.I.)

  16. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  17. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    Directory of Open Access Journals (Sweden)

    Paolo Renna

    2017-03-01

    Full Text Available Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performance measures are compared with a system without any flexibility and no preventive maintenance actions. Different levels of flexibility and preventive maintenance actions are examined under a simulation environment. The simulation results highlight more important factors for the performance measures and the best combination of the factors to improve the performance.

  18. Safety related maintenance in the framework of the reliability centered maintenance concept

    International Nuclear Information System (INIS)

    1992-07-01

    Elevated safety requirements and ever increasing costs of maintenance of nuclear power plants stimulate the interest in different methods and approaches to optimize maintenance activities. Among different concepts, the Reliability Centered Maintenance (RCM) as an approach to improve Preventive Maintenance (PM) programmes is being widely discussed an applied in several IAEA Member States. In order to summarize basic principles and current implementation of the RCM, the IAEA organized a Consultants Meeting in November 1990. The report prepared during that meeting was discussed during the Technical Committee Meeting (TCM) held in May 1991. Numerous technical presentations as well as panel and plenary discussions took place at the TCM. This document contains the report of the Consultants Meeting (modified to include comments of the TCM), a summary of the most important discussions as well as all 14 papers presented at the TCM

  19. Cost effectiveness of the MDOT preventive maintenance program.

    Science.gov (United States)

    2013-04-01

    The Michigan Department of Transportations (MDOT) pavement preservation program dates back to 1992. MDOTs pavement preservation strategy is primarily implemented through its capital preventive maintenance (CPM) program, in which preventive main...

  20. Preventive maintenance optimization for a multi-component system under changing job shop schedule

    International Nuclear Information System (INIS)

    Zhou Xiaojun; Lu Zhiqiang; Xi Lifeng

    2012-01-01

    Variability and small lot size is a common feature for many discrete manufacturing processes designed to meet a wide array of customer needs. Because of this, job shop schedule often has to be continuously updated in reaction to changes in production plan. Generally, the aim of preventive maintenance is to ensure production effectiveness and therefore the preventive maintenance models must have the ability to be adaptive to changes in job shop schedule. In this paper, a dynamic opportunistic preventive maintenance model is developed for a multi-component system with considering changes in job shop schedule. Whenever a job is completed, preventive maintenance opportunities arise for all the components in the system. An optimal maintenance practice is dynamically determined by maximizing the short-term cumulative opportunistic maintenance cost savings for the system. The numerical example shows that the scheme obtained by the proposed model can effectively address the preventive maintenance scheduling problem caused by the changes in job shop schedule and is more efficient than the ones based on two other commonly used preventive maintenance models.

  1. Preventive maintenance prioritization index of medical equipment using quality function deployment.

    Science.gov (United States)

    Saleh, Neven; Sharawi, Amr A; Elwahed, Manal Abd; Petti, Alberto; Puppato, Daniele; Balestra, Gabriella

    2015-05-01

    Preventive maintenance is a core function of clinical engineering, and it is essential to guarantee the correct functioning of the equipment. The management and control of maintenance activities are equally important to perform maintenance. As the variety of medical equipment increases, accordingly the size of maintenance activities increases, the need for better management and control become essential. This paper aims to develop a new model for preventive maintenance priority of medical equipment using quality function deployment as a new concept in maintenance of medical equipment. We developed a three-domain framework model consisting of requirement, function, and concept. The requirement domain is the house of quality matrix. The second domain is the design matrix. Finally, the concept domain generates a prioritization index for preventive maintenance considering the weights of critical criteria. According to the final scores of those criteria, the prioritization action of medical equipment is carried out. Our model proposes five levels of priority for preventive maintenance. The model was tested on 200 pieces of medical equipment belonging to 17 different departments of two hospitals in Piedmont province, Italy. The dataset includes 70 different types of equipment. The results show a high correlation between risk-based criteria and the prioritization list.

  2. Application of preventive maintenance planning in a parquet ...

    African Journals Online (AJOL)

    In this study, the process of a parquet enterprise's transition to preventive maintenance which has been implementing maintenance technique in case of breakdown was investigated. During that transition process, follow up forms for maintenance–repair, breakdown and spare parts were prepared and the implementation ...

  3. Optimisation oriented lean six sigma development for maintenance management in service sector

    OpenAIRE

    Alsubaie, Barrak Hamdan

    2016-01-01

    This thesis was submitted for the award of Doctor of Philosophy and was awarded by Brunel University London This research deals with the optimization of preventive maintenance (PM) and process improvement for maintenance management in service sector. To stay competitive and sustain long-term profitability, process improvement methodologies have become strategically important for maintenance management in recent years. These include well-known approaches such as Total Quality Management (TQ...

  4. 40 CFR 93.116 - Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots).

    Science.gov (United States)

    2010-07-01

    ..., PM10, and PM2.5 violations (hot-spots). 93.116 Section 93.116 Protection of Environment ENVIRONMENTAL....116 Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots). (a) This paragraph... hot-spot analysis in PM10 and PM2.5 nonattainment and maintenance areas for FHWA/FTA projects that are...

  5. Preventive maintenance-A countermeasure to plant aging

    International Nuclear Information System (INIS)

    Hlubek, W.

    1985-01-01

    The aging of power plants is caused by manifold and different influences. For instance, mechanical and thermal stress, radiation exposure, denting or wastage can considerably affect the aging of plant components and thus cause premature failures of components. In this presentation, the term 'Plant Aging' in nuclear power plants is to be understood more comprehensively than wear on components and material fatigue. In addition, nuclear power plants are to be adjusted to the advancing state of the science and technology (state-of-the-art) in order to guarantee safe operation at all times. The preventive maintenance - as a countermeasure to plant aging - comprises the systematic checks and servicing of the plant systems in operation and follows aging by inspection and tests. Experience with Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) preventive maintenance program at the Biblis NNP (1300 MW, PWR) is discussed. The concept of an 'Integrated Maintenance System' as a means to avoid 'Plant Aging' is presented

  6. Periodic imperfect preventive maintenance with two categories of competing failure modes

    Energy Technology Data Exchange (ETDEWEB)

    Zequeira, R.I. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: romulo.zequeira@utt.fr; Berenguer, C. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: christophe.berenguer@utt.fr

    2006-04-15

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists.

  7. Periodic imperfect preventive maintenance with two categories of competing failure modes

    International Nuclear Information System (INIS)

    Zequeira, R.I.; Berenguer, C.

    2006-01-01

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists

  8. RCM optimization of a system under both preventive and corrective maintenance

    International Nuclear Information System (INIS)

    Bris, R.; Cepin, M.

    2005-01-01

    Testing and maintenance activities of power electrical equipment are an important potential for both risk and cost reduction. A multi-objective maintenance optimization method is presented based on the Genetic Algorithms (GA) technique. The method determines the optimal schedule of preventive maintenance actions based on minimization both selected risk measure and cost. Applied cost model takes into account both preventive and corrective maintenance. This paper also presents application of the methodology to optimize maintenance of a real distribution network 22 kV. Conclusions and recommendations for practice are made on the basis of obtained results. (author)

  9. An integrated production, inventory and preventive maintenance model for a multi-product production system

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Wenbin; Peng, Rui

    2015-01-01

    This paper considers a production system that can produce multiple products alternately. Products go through the system in a sequence and a complete run of all products forms a production cycle. An integrated production, inventory and preventive maintenance model is constructed, which is characterized by the delay-time concept. Two different situations are studied based on whether the unqualified products and downtime caused by the failures of the system, set-up and preventive maintenance can be ignored or not. Three cases are considered for each situation, depending on the position of the preventive maintenance epochs: the first case, where preventive maintenance is carried out at the end of each production cycle; the second case, where preventive maintenance is carried out at each set-up time of the products; and the third case, where preventive maintenance is carried out at some set-up times only, since it may not always be optimal to carry out preventive maintenance at the end of the production cycle or at each set-up time. The modeling objectives are to find the optimal number of production cycles per year and the optimal position of preventive maintenance that will maximize the expected profit per unit time. Numerical examples, using real data, are presented to illustrate the model. - Highlights: • We propose an integrated economic production quantity and preventive maintenance model. • The situation that multiple products are produced on the same system alternately is studied. • Two situations are studied based on whether the downtime and the product quality can be ignored or not. • We use enumeration method and analytical method to select the optimal preventive maintenance policy, respectively. • We use the delay-time concept to model the preventive maintenance policy

  10. Preventive and corrective maintenance for MINT EPS 3000 electron beam machine

    International Nuclear Information System (INIS)

    Siti Aiasah Hashim; Shaari Jahar

    2005-01-01

    Preventive and corrective maintenance of a high energy electron is to ensure that the machine would not fail during operation. MINT's EPS 3000 electron beam machine has been in operation for almost 12 years. Throughout those years, events relating to scheduled overhauls and unscheduled corrective maintenance had provided invaluable experience in the form of informal maintenance training to the operators. With the implementation of ISO 9001:2000 Quality Management System at the facility, the preventive and corrective maintenance program is becoming more structured and orderly. Collected maintenance data shall be used to initiate continual improvement activities in the facility.This paper describes MINT-ALURTRON's 12 years experience in providing maintenance work for the EPS 3000. (Author)

  11. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    Directory of Open Access Journals (Sweden)

    Xuejuan Liu

    2017-07-01

    Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  12. Design of Polymeric Nanofiber Gauze Mask to Prevent Inhaling PM2.5 Particles from Haze Pollution

    Directory of Open Access Journals (Sweden)

    Xingzhou Li

    2015-01-01

    Full Text Available Recently, PM2.5 (particulate matter with diameter of 2.5 micron or less has become a major health hazard from the polluted air in many cities in China. The regular gauze masks are used to prevent inhaling the PM2.5 fine particles; however, those masks are not able to filter out the PM2.5 because of the large porosity of the mask materials. Some well-prevented masks usually have poor breathability, which increases other health risks. In this study, a polysulfone based nanofiber for mask filtration material was synthesized by electrospinning. That nanofiber mask material was characterized by SEM, air permeability test, and PM2.5 trapping experiment. The results indicate that nanofiber mask material can efficiently filter out the PM2.5 particles and simultaneously preserve a good breathability. We attribute such improvement to the nanoscaled fibers, having the same porosity as that of regular gauze mask but with extremely reduced local interfiber space.

  13. RCM [reliability-centered maintenance] at Ginna: Preventive maintenance program optimization at year 20

    International Nuclear Information System (INIS)

    Edgar, E.C.

    1989-01-01

    The reliability-centered maintenance (RCM) program at Rochester Gas ampersand Electric Company's Ginna station is entering its second year. Of the 20 systems originally selected for evaluation, 10 are in various stages of completion, and recommendations resulting from the earliest systems studied are now being implemented. As expected, few major discoveries have been made in terms of preventive maintenance program failings or excesses. The performance of the now 20-yr-old plant has been excellent in recent years, and objectives focus more on ensuring continued high standards of safety, reliability, and economy than on maintenance program cost reduction

  14. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  15. Potential Harmful Effects of PM2.5 on Occurrence and Progression of Acute Coronary Syndrome: Epidemiology, Mechanisms, and Prevention Measures

    Directory of Open Access Journals (Sweden)

    Xu Meng

    2016-07-01

    Full Text Available The harmful effects of particulate matter with an aerodynamic diameter of <2.5 µm (PM2.5 and its association with acute coronary syndrome (ACS has gained increased attention in recent years. Significant associations between PM2.5 and ACS have been found in most studies, although sometimes only observed in specific subgroups. PM2.5-induced detrimental effects and ACS arise through multiple mechanisms, including endothelial injury, an enhanced inflammatory response, oxidative stress, autonomic dysfunction, and mitochondria damage as well as genotoxic effects. These effects can lead to a series of physiopathological changes including coronary artery atherosclerosis, hypertension, an imbalance between energy supply and demand to heart tissue, and a systemic hypercoagulable state. Effective strategies to prevent the harmful effects of PM2.5 include reducing pollution sources of PM2.5 and population exposure to PM2.5, and governments and organizations publicizing the harmful effects of PM2.5 and establishing air quality standards for PM2.5. PM2.5 exposure is a significant risk factor for ACS, and effective strategies with which to prevent both susceptible and healthy populations from an increased risk for ACS have important clinical significance in the prevention and treatment of ACS.

  16. Optimizing preventive maintenance policy: A data-driven application for a light rail braking system.

    Science.gov (United States)

    Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel

    2017-10-01

    This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions.

  17. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    OpenAIRE

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older tec...

  18. Modelling maintenance practice of production plant using the delay-time concept

    NARCIS (Netherlands)

    Christer, A.H.; Wang, Wenbin; Baker, R.D.; Sharp, J.

    1995-01-01

    In this paper we present a study carried out for a copper products manufacturing company, developing and applying the delay-time modelling technique to model and thus optimize preventive maintenance (PM) of the plant. A key machine in the plant is used to illustrate the modelling process and

  19. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  20. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  1. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    OpenAIRE

    Paolo Renna

    2017-01-01

    Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performa...

  2. Repair and preventive maintenance technology for BWR reactor internals and piping

    International Nuclear Information System (INIS)

    Ootsubo, Tooru; Itou, Takashi; Sakashita, Akihiro

    2009-01-01

    Stress corrosion cracking of welding portion has found in many domestic and foreign BWR reactor internals and Primary Loop Recirculation piping. Also, repair and preventive maintenance technologies for SCC has been developed and/or adopted to BWRs in recent years. This paper introduces the sample of these technologies, such as seal-welding for SCC on BWR reactor internals, preventive maintenance technology for PLR piping such as Corrosion Resistant Cladding, Internal Polishing and Induction Heating Stress Improvement. These technologies are introduced on 'E-Journal of Advanced Maintenance', which is an international journal on a exclusive website of Japan Society of Maintenology. (author)

  3. Preventive Maintenance Optimization in Healthcare Domain: Status of Research and Perspective

    OpenAIRE

    Mahfoud, H.; El Barkany, A.; El Biyaali, A.

    2016-01-01

    Although medical equipment maintenance has been carefully managed for years, very few in-depth studies have been conducted to evaluate the effectiveness and efficiency of these implemented preventive maintenance strategies, especially after the debate about the credibility of manufacturer’s recommendations has increased in the clinical engineering community. Facing the dilemma of merely following manufactures maintenance manual or establishing an evidence-based maintenance, medical equipment ...

  4. Using risk-informed asset management for feedwater system preventative maintenance optimization

    International Nuclear Information System (INIS)

    Kee, Ernest; Sun, Alice; Richards, Andrew; Grantom, Rick; Liming, James; Salter, James

    2004-01-01

    The initial development of a South Texas Project Nuclear Operating Company process for supporting preventative maintenance optimization by applying the Balance-Of-Plant model and Risk-Informed Asset Management alpha-level software applications is presented. Preventative maintenance activities are evaluated in the South Texas Project Risk-Informed Asset Management software while the plant maintains or improves upon high levels of nuclear safety. In the Balance-Of-Plant availability application, the level of detail in the feedwater system is enhanced to support plant decision-making at the component failure mode and human error mode level of indenture by elaborating on the current model at the super-component level of indenture. The enhanced model and modeling techniques are presented. Results of case studies in feedwater system preventative maintenance optimization sing plant-specific data are also presented. (author)

  5. Design of preventive maintenance system using the reliability engineering and maintenance value stream mapping methods in PT. XYZ

    Science.gov (United States)

    Sembiring, N.; Panjaitan, N.; Angelita, S.

    2018-02-01

    PT. XYZ is a company owned by non-governmental organizations engaged in the field of production of rubber processing becoming crumb rubber. Part of the production is supported by some of machines and interacting equipment to achieve optimal productivity. Types of the machine that are used in the production process are Conveyor Breaker, Breaker, Rolling Pin, Hammer Mill, Mill Roll, Conveyor, Shredder Crumb, and Dryer. Maintenance system in PT. XYZ is corrective maintenance i.e. repairing or replacing the engine components after the crash on the machine. Replacement of engine components on corrective maintenance causes the machine to stop operating during the production process is in progress. The result is in the loss of production time due to the operator must replace the damaged engine components. The loss of production time can impact on the production targets which were not reached and lead to high loss costs. The cost for all components is Rp. 4.088.514.505. This cost is really high just for maintaining a Mill Roll Machine. Therefore PT. XYZ is needed to do preventive maintenance i.e. scheduling engine components and improving maintenance efficiency. The used methods are Reliability Engineering and Maintenance Value Stream Mapping (MVSM). The needed data in this research are the interval of time damage to engine components, opportunity cost, labor cost, component cost, corrective repair time, preventive repair time, Mean Time To Opportunity (MTTO), Mean Time To Repair (MTTR), and Mean Time To Yield (MTTY). In this research, the critical components of Mill Roll machine are Spier, Bushing, Bearing, Coupling and Roll. Determination of damage distribution, reliability, MTTF, cost of failure, cost of preventive, current state map, and future state map are done so that the replacement time for each critical component with the lowest maintenance cost and preparation of Standard Operation Procedure (SOP) are developed. For the critical component that has been

  6. Condition monitoring a key component in the preventive maintenance

    International Nuclear Information System (INIS)

    Isar, C.

    2006-01-01

    The preventive maintenance programs are necessary to ensure that nuclear safety significant equipment will function when it is supposed to. Diesel generator, pumps, motor operated valves and air operated control valves are typically operated every three months. When you drive a car, you depend on lot of sounds, the feel of the steering wheel and gauges to determine if the car is running correctly. Similarly with operating equipment for a power plant - sounds or vibration of the equipment or the gauges and test equipment indicate a problem or degradation, actions are taken to correct the deficiency. Due to safety and economical reason diagnostic and monitoring systems are of growing interest in all complex industrial production. Diagnostic systems are requested to detect, diagnose and localize faulty operating conditions at an early stage in order to prevent severe failures and to enable predictive and condition oriented maintenance. In this context it is a need for using various on-line and off-line condition monitoring and diagnostics, non-destructive inspection techniques and surveillance. The condition monitoring technique used in nuclear power plant Cernavoda are presented in this paper. The selection of components and parameters to be monitored, monitoring and diagnostics techniques used are incorporated into a preventive maintenance program. Modern measurement technique in combination with advanced computerized data processing and acquisition show new ways in the field of machine surveillance. The diagnostic capabilities of predictive maintenance technologies have increased recently year with advances made in sensor technologies. The paper will focus on the following condition monitoring technique: - oil analysis - acoustic leakage monitoring - thermography - valve diagnostics: motor operated valve, air operated valve and check valve - motor current signature - vibration monitoring and rotating machine monitoring and diagnostics For each condition monitoring

  7. Preventive Maintenance Scheduling for Multicogeneration Plants with Production Constraints Using Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Khaled Alhamad

    2015-01-01

    Full Text Available This paper describes a method developed to schedule the preventive maintenance tasks of the generation and desalination units in separate and linked cogeneration plants provided that all the necessary maintenance and production constraints are satisfied. The proposed methodology is used to generate two preventing maintenance schedules, one for electricity and the other for distiller. Two types of crossover operators were adopted, 2-point and 4-point. The objective function of the model is to maximize the available number of operational units in each plant. The results obtained were satisfying the problem parameters. However, 4-point slightly produce better solution than 2-point ones for both electricity and water distiller. The performance as well as the effectiveness of the genetic algorithm in solving preventive maintenance scheduling is applied and tested on a real system of 21 units for electricity and 21 units for water. The results presented here show a great potential for utility applications for effective energy management over a time horizon of 52 weeks. The model presented is an effective decision tool that optimizes the solution of the maintenance scheduling problem for cogeneration plants under maintenance and production constraints.

  8. A Simulation Model for Machine Efficiency Improvement Using Reliability Centered Maintenance: Case Study of Semiconductor Factory

    Directory of Open Access Journals (Sweden)

    Srisawat Supsomboon

    2014-01-01

    Full Text Available The purpose of this study was to increase the quality of product by focusing on the machine efficiency improvement. The principle of the reliability centered maintenance (RCM was applied to increase the machine reliability. The objective was to create preventive maintenance plan under reliability centered maintenance method and to reduce defects. The study target was set to reduce the Lead PPM for a test machine by simulating the proposed preventive maintenance plan. The simulation optimization approach based on evolutionary algorithms was employed for the preventive maintenance technique selection process to select the PM interval that gave the best total cost and Lead PPM values. The research methodology includes procedures such as following the priority of critical components in test machine, analyzing the damage and risk level by using Failure Mode and Effects Analysis (FMEA, calculating the suitable replacement period through reliability estimation, and optimizing the preventive maintenance plan. From the result of the study it is shown that the Lead PPM of test machine can be reduced. The cost of preventive maintenance, cost of good product, and cost of lost product were decreased.

  9. Preventive maintenance and the interval availability distribution of an unreliable production system

    International Nuclear Information System (INIS)

    Dijkhuizen, G. van; Heijden, M. van der

    1999-01-01

    Traditionally, the optimal preventive maintenance interval for an unreliable production system has been determined by maximizing its limiting availability. Nowadays, it is widely recognized that this performance measure does not always provide relevant information for practical purposes. This is particularly true for order-driven manufacturing systems, in which due date performance has become a more important, and even a competitive factor. Under these circumstances, the so-called interval availability distribution is often seen as a more appropriate performance measure. Surprisingly enough, the relation between preventive maintenance and interval availability has received little attention in the existing literature. In this article, a series of mathematical models and optimization techniques is presented, with which the optimal preventive maintenance interval can be determined from an interval availability point of view, rather than from a limiting availability perspective. Computational results for a class of representative test problems indicate that significant improvements of up to 30% in the guaranteed interval availability can be obtained, by increasing preventive maintenance frequencies somewhere between 10 and 70%

  10. A PSO approach for preventive maintenance scheduling optimization

    International Nuclear Information System (INIS)

    Pereira, C.M.N.A.; Lapa, C.M.F.; Mol, A.C.A.; Luz, A.F. da

    2009-01-01

    This work presents a Particle Swarm Optimization (PSO) approach for preventive maintenance policy optimization, focused in reliability and cost. The probabilistic model for reliability and cost evaluation is developed in such a way that flexible intervals between maintenance are allowed. As PSO is skilled for realcoded continuous spaces, a non-conventional codification has been developed in order to allow PSO to solve scheduling problems (which is discrete) with variable number of maintenance interventions. In order to evaluate the proposed methodology, the High Pressure Injection System (HPIS) of a typical 4-loop PWR has been considered. Results demonstrate ability in finding optimal solutions, for which expert knowledge had to be automatically discovered by PSO. (author)

  11. A preventive maintenance lubricant

    Energy Technology Data Exchange (ETDEWEB)

    Chapaykina, S A; Ol' kov, P L; Pertsev, A N; Rodzevillo, I T; Rogacheva, O I; Zinov' yev, A P

    1980-02-15

    A method is disclosed to lower the adherence of materials by reducing the viscosity of a preventive maintenance lubricant against adhesion of moist, freeflowing materials, containing extract of selective cleaning of oil fractions and asphalt. Gas oil of catalytic cracking is added having a boiling point of 190-300 degrees, with the following ratio of components (%): selective cleaning extract, 43-50; asphalt, 14-16; and gas oil of catalytic cracking, the remainder, Treating a surface with the proposed lubricant lowers the specific resistance to shift of rock compared with the prototype (g/cm/sup 2/): sand (moisture content, 18%) from 3.82 to 1.55; and clay (moisture content 16%), from 5.41 to 3.51.

  12. Preventive maintenance measures and repeat tests on actuators

    International Nuclear Information System (INIS)

    Hueren, H.

    1990-01-01

    At Biblis Nuclear Power Station, about 1500 electrical actuators and variable speed drives of various model ranges and with various driving end speeds and actuating times are installed and about 600 of these are located in important safety engineering systems. In order to optimize the preventive maintenance measures on the drives, a data bank has been established into which are stored, in addition to the fixed type data of each drive, inter alia, statements about location of application, valve type, inspection cycle, calendar year of next maintenance, findings during inspection measures and causes of faults. Before each unit inspection, in addition to the inspection lists, the maintenance and installation records and also the associated job instructions are produced from this data processing equipment. (orig.) [de

  13. Reliability theory with applications to preventive maintenance

    CERN Document Server

    Gertsbakh, Ilya

    2000-01-01

    The material in this book was first presented as a one-semester course in Relia­ bility Theory and Preventive Maintenance for M.Sc. students of the Industrial Engineering Department of Ben Gurion University in the 1997/98 and 1998/99 academic years. Engineering students are mainly interested in the applied part of this theory. The value of preventive maintenance theory lies in the possibility of its imple­ mentation, which crucially depends on how we handle statistical reliability data. The very nature of the object of reliability theory - system lifetime - makes it extremely difficult to collect large amounts of data. The data available are usu­ ally incomplete, e.g. heavily censored. Thus, the desire to make the course material more applicable led me to include in the course topics such as mod­ eling system lifetime distributions (Chaps. 1,2) and the maximum likelihood techniques for lifetime data processing (Chap. 3). A course in the theory of statistics is aprerequisite for these lectures. Stan­ dard...

  14. The PM/S module and the BIO/TSR requirements comparison report summary

    International Nuclear Information System (INIS)

    PEERY, B.Q.

    1999-01-01

    This report summarizes the comparison between the Preventive Maintenance/Surveillance System (PM/S) database and the requirements identified in the Tank Waste Remediation Systems Basis for Interim Operation (BIO) (HNF-SD-WM-BIO-001); the Technical Safety Requirements (TSR's) (HNF-SD-WM-TSR-006); The Tank Farms Administrative Controls Manual, (HNF-IP-1266); and The TWRS Facility Safety Equipment List, (HNF-SD-WM-SEL-0404). Corrective actions identified are completed or in process

  15. design of preventive maintenance scheduling model for ...

    African Journals Online (AJOL)

    connected in parallel, Rj(ti) is the reliability of the jth unit at ith time interval, n is the to- tal number of systems (components or units) connected in parallel. Equations (3) and (4) enable us to deter- mine the reliability of all components, units or sub-systems in an industry. 5. System Reliability with Preventive. Maintenance. Fig.

  16. Preventive maintenance for computer systems - concepts & issues ...

    African Journals Online (AJOL)

    Performing preventive maintenance activities for the computer is not optional. The computer is a sensitive and delicate device that needs adequate time and attention to make it work properly. In this paper, the concept and issues on how to prolong the life span of the system, that is, the way to make the system last long and ...

  17. Probabilistic methods for maintenance program optimization

    International Nuclear Information System (INIS)

    Liming, J.K.; Smith, M.J.; Gekler, W.C.

    1989-01-01

    In today's regulatory and economic environments, it is more important than ever that managers, engineers, and plant staff join together in developing and implementing effective management plans for safety and economic risk. This need applied to both power generating stations and other process facilities. One of the most critical parts of these management plans is the development and continuous enhancement of a maintenance program that optimizes plant or facility safety and profitability. The ultimate objective is to maximize the potential for station or facility success, usually measured in terms of projected financial profitability, while meeting or exceeding meaningful and reasonable safety goals, usually measured in terms of projected damage or consequence frequencies. This paper describes the use of the latest concepts in developing and evaluating maintenance programs to achieve maintenance program optimization (MPO). These concepts are based on significant field experience gained through the integration and application of fundamentals developed for industry and Electric Power Research Institute (EPRI)-sponsored projects on preventive maintenance (PM) program development and reliability-centered maintenance (RCM)

  18. Condition-Based Maintenance Strategy for Production Systems Generating Environmental Damage

    Directory of Open Access Journals (Sweden)

    L. Tlili

    2015-01-01

    Full Text Available We consider production systems which generate damage to environment as they get older and degrade. The system is submitted to inspections to assess the generated environmental damage. The inspections can be periodic or nonperiodic. In case an inspection reveals that the environmental degradation level has exceeded the critical level U, the system is considered in an advanced deterioration state and will have generated significant environmental damage. A corrective maintenance action is then performed to renew the system and clean the environment and a penalty has to be paid. In order to prevent such an undesirable situation, a lower threshold level L is considered to trigger a preventive maintenance action to bring back the system to a state as good as new at a lower cost and without paying the penalty. Two inspection policies are considered (periodic and nonperiodic. For each one of them, a mathematical model and a numerical procedure are developed to determine simultaneously the preventive maintenance (PM threshold L∗ and the inspection sequence which minimize the average long-run cost per time unit. Numerical calculations are performed to illustrate the proposed maintenance policies and highlight their main characteristics with respect to relevant input parameters.

  19. Multi-objective group scheduling optimization integrated with preventive maintenance

    Science.gov (United States)

    Liao, Wenzhu; Zhang, Xiufang; Jiang, Min

    2017-11-01

    This article proposes a single-machine-based integration model to meet the requirements of production scheduling and preventive maintenance in group production. To describe the production for identical/similar and different jobs, this integrated model considers the learning and forgetting effects. Based on machine degradation, the deterioration effect is also considered. Moreover, perfect maintenance and minimal repair are adopted in this integrated model. The multi-objective of minimizing total completion time and maintenance cost is taken to meet the dual requirements of delivery date and cost. Finally, a genetic algorithm is developed to solve this optimization model, and the computation results demonstrate that this integrated model is effective and reliable.

  20. Development of preventive maintenance technology and advanced service equipment for operating nuclear power plants

    International Nuclear Information System (INIS)

    Abe, Kazuhiro; Sumikawa, Masaharu; Hirakawa, Hiromasa; Arakawa, Tadao; Hasegawa, Kunio; Kato, Kanji.

    1990-01-01

    Hitachi Ltd. as a manufacturer of nuclear power plants has carried out the consistent general preventive maintenance activities from the planning of the plants and the design of maintainability in the construction phase to the planning and working of preventive maintenance in the operation and maintenance phase, and exerted efforts to heighten the capacity ratio and reliability of the plants. For the purpose, the steady activities of reliability improvement have been carried out throughout the whole company, and the rationalization of the planning and management of the preventive maintenance with a computer and the development of the robots to which Al is applied have been promoted. As the technology of upgrading the facilities, boron racks, the control rods having long life and so on were developed, and their practical use is advanced. Moreover for the future, the development of the diagnostic technology on material deterioration using superconductive quantum interference devices (SQUID) is in progress. The preventive maintenance activities in Hitachi Ltd., the technical development for the purpose and the upgrading of the plant facilities are reported. (K.I.)

  1. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  2. Probabilistic sensitivity analysis of optimised preventive maintenance strategies for deteriorating infrastructure assets

    International Nuclear Information System (INIS)

    Daneshkhah, A.; Stocks, N.G.; Jeffrey, P.

    2017-01-01

    Efficient life-cycle management of civil infrastructure systems under continuous deterioration can be improved by studying the sensitivity of optimised preventive maintenance decisions with respect to changes in model parameters. Sensitivity analysis in maintenance optimisation problems is important because if the calculation of the cost of preventive maintenance strategies is not sufficiently robust, the use of the maintenance model can generate optimised maintenances strategies that are not cost-effective. Probabilistic sensitivity analysis methods (particularly variance based ones), only partially respond to this issue and their use is limited to evaluating the extent to which uncertainty in each input contributes to the overall output's variance. These methods do not take account of the decision-making problem in a straightforward manner. To address this issue, we use the concept of the Expected Value of Perfect Information (EVPI) to perform decision-informed sensitivity analysis: to identify the key parameters of the problem and quantify the value of learning about certain aspects of the life-cycle management of civil infrastructure system. This approach allows us to quantify the benefits of the maintenance strategies in terms of expected costs and in the light of accumulated information about the model parameters and aspects of the system, such as the ageing process. We use a Gamma process model to represent the uncertainty associated with asset deterioration, illustrating the use of EVPI to perform sensitivity analysis on the optimisation problem for age-based and condition-based preventive maintenance strategies. The evaluation of EVPI indices is computationally demanding and Markov Chain Monte Carlo techniques would not be helpful. To overcome this computational difficulty, we approximate the EVPI indices using Gaussian process emulators. The implications of the worked numerical examples discussed in the context of analytical efficiency and organisational

  3. A reliability-based preventive maintenance methodology for the projection spot welding machine

    Directory of Open Access Journals (Sweden)

    Fayzimatov Ulugbek

    2018-06-01

    Full Text Available An effective operations of a projection spot welding (PSW machine is closely related to the effec-tiveness of the maintenance. Timely maintenance can prevent failures and improve reliability and maintainability of the machine. Therefore, establishing the maintenance frequency for the welding machine is one of the most important tasks for plant engineers. In this regard, reliability analysis of the welding machine can be used to establish preventive maintenance intervals (PMI and to identify the critical parts of the system. In this reliability and maintainability study, analysis of the PSW machine was carried out. The failure and repair data for analysis were obtained from automobile manufacturing company located in Uzbekistan. The machine was divided into three main sub-systems: electrical, pneumatic and hydraulic. Different distributions functions for all sub-systems was tested and their parameters tabulated. Based on estimated parameters of the analyzed distribu-tions, PMI for the PSW machines sub-systems at different reliability levels was calculated. Finally, preventive measures for enhancing the reliability of the PSW machine sub-systems are suggested.

  4. Preventive Maintenance Interval Prediction: a Spare Parts Inventory Cost and Lost Earning Based Model

    Directory of Open Access Journals (Sweden)

    O. A. Adebimpe

    2015-06-01

    Full Text Available In this paper, some preventive maintenance parameters in manufacturing firms were identified and used to develop cost based functions in terms of machine preventive maintenance. The proposed cost based model considers system’s reliability, cost of keeping spare parts inventory and lost earnings in deriving optimal maintenance interval. A case of a manufacturing firm in Nigeria was observed and the data was used to evaluate the model.

  5. Single-stage Kanban system with deterioration failures and condition-based preventive maintenance

    International Nuclear Information System (INIS)

    Xanthopoulos, A.S.; Koulouriotis, D.E.; Botsaris, P.N.

    2015-01-01

    Despite the fact that the fields of pull type production control policies and condition-based preventive maintenance have much in common contextually, they have evolved independently up to now. In this investigation, an attempt is made to bridge the gap between these two branches of knowledge by introducing the single-stage Kanban system with deterioration failures and condition-based preventive maintenance. The formalism of continuous time Markov chains is used to model the system and expressions for eight performance metrics are derived. Two important, from a managerial perspective, constrained optimization problems for the proposed model are defined where the objective is the simultaneous optimization of the Kanban policy, the preventive maintenance policy and the inspection schedule under conflicting performance criteria. Multiple instances of each optimization problem are solved by means of the augmented Lagrangian genetic algorithm. The results from the optimization trials coupled by the results from extensive numerical examples facilitate the thorough investigation of the system’s behaviour. - Highlights: • Kanban system with deterioration failures and preventive maintenance is introduced. • The system is modeled as a continuous time Markov chain. • Expressions for eight performance metrics are derived. • The behavior of the system is studied through numerical examples. • Optimization results for selected performance metrics are presented

  6. A maintenance policy for a system with multi-state components: an approximate solution

    International Nuclear Information System (INIS)

    Guerler, Uelkue; Kaya, Alev

    2002-01-01

    For maintenance and quality assessment purposes, various performance levels for both systems and components are identified, usually as a function of the deterioration. In this study, we consider a multicomponent system where the lifetime of each component is described by several stages, (0,...,S), which are further classified as good, doubtful, preventive maintenance due (PM due) and down. A control policy is suggested where the system is replaced when a component enters a PM due or a down state and the number of components in the doubtful states (K,...,S-2) is at least N. All maintenance activities are assumed to take negligible time. The exact description of the underlying stochastic model under the policy is very complicated. We therefore propose some approximations, which allow an explicit expression for the long run average cost function, which is minimized w.r.t. (K,N) by numerical methods. Sensitivity of the model to system parameters and the performance of the approximation are investigated through several examples

  7. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  8. PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR

    Directory of Open Access Journals (Sweden)

    Yugowati Praharsi

    2015-06-01

    Full Text Available PT. Artha Prima Sukses Makmur memiliki lima mesin dalam menjalankan kegiatan produksi sol sepatu yang berlangsung 24 jam setiap hari, sehingga kegiatan perawatan dan pemeliharaan perlu dilakukan dengan baik dan dijadwalkan agar tidak mengganggu kegiatan produksi yang sedang berlangsung. Kerusakan mesin saat ini masih terhitung tinggi dan memerlukan waktu perbaikan yang cukup lama. Perancangan penjadwalan maintenancediperlukan untuk mengurangi downtime pada mesin, sehingga tidak menghambat dan mengganggu jadwal produksi. Penjadwalan yang diusulkan adalah preventive maintenance dengan metode age replacement. Berdasarkan prinsip Pareto terdapat dua mesin kritis dari lima mesin yang ada.Hasil perhitungan dari data kerusakan mesin sebelumnya diketahui, jika dilakukan preventive maintenance downtime akan berkurang sebanyak 2.85%, dan terjadi penghematan sebesar 38%.

  9. PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR

    Directory of Open Access Journals (Sweden)

    Yugowati Praharsi

    2015-06-01

    Full Text Available PT. Artha Prima Sukses Makmur memiliki lima mesin dalam menjalankan kegiatan produksi sol sepatu yang berlangsung 24 jam setiap hari, sehingga kegiatan perawatan dan pemeliharaan perlu dilakukan dengan baik dan dijadwalkan agar tidak mengganggu kegiatan produksi yang sedang berlangsung. Kerusakan mesin saat ini masih terhitung tinggi dan memerlukan waktu perbaikan yang cukup lama. Perancangan penjadwalan  maintenancediperlukan untuk mengurangi downtime pada mesin, sehingga tidak menghambat dan mengganggu jadwal produksi. Penjadwalan yang diusulkan adalah preventive maintenance dengan metode age replacement. Berdasarkan prinsip Pareto terdapat dua mesin kritis dari lima mesin yang ada.Hasil perhitungan dari data kerusakan mesin sebelumnya diketahui, jika dilakukan preventive maintenance downtime akan berkurang sebanyak 2.85%, dan terjadi penghematan sebesar 38%.

  10. Fleet equipment performance measurement preventive maintenance model : final report.

    Science.gov (United States)

    2014-04-01

    The concept of preventive maintenance is very important in the effective management and deployment of : vehicle fleets. The Texas Department of Transportation (TxDOT) operates a large fleet of on-road and offroad : equipment. Newer engines and vehicl...

  11. A preventive maintenance policy based on dependent two-stage deterioration and external shocks

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Peng, Rui; Zhai, Qingqing; Zhao, Yu

    2017-01-01

    This paper proposes a preventive maintenance policy for a single-unit system whose failure has two competing and dependent causes, i.e., internal deterioration and sudden shocks. The internal failure process is divided into two stages, i.e. normal and defective. Shocks arrive according to a non-homogeneous Poisson process (NHPP), leading to the failure of the system immediately. The occurrence rate of a shock is affected by the state of the system. Both an age-based replacement and finite number of periodic inspections are schemed simultaneously to deal with the competing failures. The objective of this study is to determine the optimal preventive replacement interval, inspection interval and number of inspections such that the expected cost per unit time is minimized. A case study on oil pipeline maintenance is presented to illustrate the maintenance policy. - Highlights: • A maintenance model based on two-stage deterioration and sudden shocks is developed. • The impact of internal system state on external shock process is studied. • A new preventive maintenance strategy combining age-based replacements and periodic inspections is proposed. • Postponed replacement of a defective system is provided by restricting the number of inspections.

  12. A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem

    DEFF Research Database (Denmark)

    Rahmati, Seyed Habib A.; Ahmadi, Abbas; Govindan, Kannan

    2018-01-01

    the level of the system optimization. By means of this equipment, managers can benefit from a condition-based maintenance (CBM) for monitoring and managing their system. The chief aim of the paper is to develop a stochastic maintenance problem based on CBM activities engaged with a complex applied......Integrated consideration of production planning and maintenance processes is a real world assumption. Specifically, by improving the monitoring equipment such as various sensors or product-embedded information devices in recent years, joint assessment of these processes is inevitable for enhancing...... production problem called flexible job shop scheduling problem (FJSP). This integrated problem considers two maintenance scenarios in terms of corrective maintenance (CM) and preventive maintenance (PM). The activation of scenario is done by monitoring the degradation condition of the system and comparing...

  13. Extended great deluge algorithm for the imperfect preventive maintenance optimization of multi-state systems

    International Nuclear Information System (INIS)

    Nahas, Nabil; Khatab, Abdelhakim; Ait-Kadi, Daoud; Nourelfath, Mustapha

    2008-01-01

    This paper deals with preventive maintenance optimization problem for multi-state systems (MSS). This problem was initially addressed and solved by Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203]. It consists on finding an optimal sequence of maintenance actions which minimizes maintenance cost while providing the desired system reliability level. This paper proposes an approach which improves the results obtained by genetic algorithm (GENITOR) in Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203]. The considered MSS have a range of performance levels and their reliability is defined to be the ability to meet a given demand. This reliability is evaluated by using the universal generating function technique. An optimization method based on the extended great deluge algorithm is proposed. This method has the advantage over other methods to be simple and requires less effort for its implementation. The developed algorithm is compared to than in Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203] by using a reference example and two newly generated examples. This comparison shows that the extended great deluge gives the best solutions (i.e. those with minimal costs) for 8 instances among 10

  14. Model Integrasi Penjadwalan Batch dan Penjadwalan Preventive Maintenance dengan Kriteria Minimisasi Biaya Simpan, Biaya Setup, Biaya Pm, serta Biaya Rework pada Mesin Stabil

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2014-06-01

    Full Text Available This study developed a model of batch scheduling involving the unavailability machine to minimize setup costs, cost of preventive maintenance and the cost of rework in a stable machine. This model is considered necessary in order to understand the effect of the unavailability machine for production runs and to understand the effect on the batch production schedule. The results of this study indicate that the first and last run will not give single batch. Given a hypothetical example of how the model and algorithm developed solve the problem instance. 

  15. Application of reliability-centered maintenance to boiling water reactor emergency core cooling systems fault-tree analysis

    International Nuclear Information System (INIS)

    Choi, Y.A.; Feltus, M.A.

    1995-01-01

    Reliability-centered maintenance (RCM) methods are applied to boiling water reactor plant-specific emergency core cooling system probabilistic risk assessment (PRA) fault trees. The RCM is a technique that is system function-based, for improving a preventive maintenance (PM) program, which is applied on a component basis. Many PM programs are based on time-directed maintenance tasks, while RCM methods focus on component condition-directed maintenance tasks. Stroke time test data for motor-operated valves (MOVs) are used to address three aspects concerning RCM: (a) to determine if MOV stroke time testing was useful as a condition-directed PM task; (b) to determine and compare the plant-specific MOV failure data from a broad RCM philosophy time period compared with a PM period and, also, compared with generic industry MOV failure data; and (c) to determine the effects and impact of the plant-specific MOV failure data on core damage frequency (CDF) and system unavailabilities for these emergency systems. The MOV stroke time test data from four emergency core cooling systems [i.e., high-pressure coolant injection (HPCI), reactor core isolation cooling (RCIC), low-pressure core spray (LPCS), and residual heat removal/low-pressure coolant injection (RHR/LPCI)] were gathered from Philadelphia Electric Company's Peach Bottom Atomic Power Station Units 2 and 3 between 1980 and 1992. The analyses showed that MOV stroke time testing was not a predictor for eminent failure and should be considered as a go/no-go test. The failure data from the broad RCM philosophy showed an improvement compared with the PM-period failure rates in the emergency core cooling system MOVs. Also, the plant-specific MOV failure rates for both maintenance philosophies were shown to be lower than the generic industry estimates

  16. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  17. The cost function for the preventive - maintenance replacement problem

    OpenAIRE

    Vilaplana, Jose Perez

    1994-01-01

    Let a discounted continuous review preventive-maintenance replacement model be such that its total discounted cost is given by means of two functional equations. We assume that downtime is caused by equipment breakdowns, and the length of a given downtime is the time necessary to repair the equipment and set it back in operation. The periodic preventive replacement policy is to replace the equipment by a new identical equipment when service age X is reached, or when the equipment ...

  18. Introduction of leadership training based on PM theory at a nuclear power plant. An analysis of leadership, morale and self-efficacy

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, Michio [Kumamoto Univ. (Japan). Dept. of Physics; Yoshiyama, Naohiro; Misumi, Emiko; Matsuda, Ryosuke; Misumi, Jyuji; Hiraki, Tadao; Sakurai, Yukihiro

    1997-09-01

    PM leadership training(PMT) course was introduced into three nuclear power plants for the purpose of accident prevention. PMT is a six-month training course consisting of three parts, i.e., lecture, PM survey, and participants` practice at their workplace. The major aim of PMT is to change participants` leadership behavior into PM-type that is the most desirable for group effectiveness. In this study, we examined the effects of PMT on participants` leadership, subordinates` morale and participants` self-efficacy. Participants were fifty-six supervisors working in operation or maintenance in each nuclear power plant. The supervisors have eight hundred forty five subordinates in all. The major results were as follows: (1) Not only participants` leadership Performance(P) and Maintenance(M) behavior was strengthened, but also their subordinates` morale increased during PMT`s 6-month course. (2) Strengthening both P and M behavior was the most effective in building up subordinates` morale, especially in teamwork, meeting satisfaction, and communication. (3) Participants` self-efficacy was related with the strength of their P behavior and subordinates` group morale. These results show that PMT course is effective in accident prevention in nuclear power plants. Finally, we discuss some future problems of the development of PMT in nuclear power plants. (author)

  19. Introduction of leadership training based on PM theory at a nuclear power plant. An analysis of leadership, morale and self-efficacy

    International Nuclear Information System (INIS)

    Yoshida, Michio; Yoshiyama, Naohiro; Misumi, Emiko; Matsuda, Ryosuke; Misumi, Jyuji; Hiraki, Tadao; Sakurai, Yukihiro.

    1997-01-01

    PM leadership training(PMT) course was introduced into three nuclear power plants for the purpose of accident prevention. PMT is a six-month training course consisting of three parts, i.e., lecture, PM survey, and participants' practice at their workplace. The major aim of PMT is to change participants' leadership behavior into PM-type that is the most desirable for group effectiveness. In this study, we examined the effects of PMT on participants' leadership, subordinates' morale and participants' self-efficacy. Participants were fifty-six supervisors working in operation or maintenance in each nuclear power plant. The supervisors have eight hundred forty five subordinates in all. The major results were as follows: (1) Not only participants' leadership Performance(P) and Maintenance(M) behavior was strengthened, but also their subordinates' morale increased during PMT's 6-month course. (2) Strengthening both P and M behavior was the most effective in building up subordinates' morale, especially in teamwork, meeting satisfaction, and communication. (3) Participants' self-efficacy was related with the strength of their P behavior and subordinates' group morale. These results show that PMT course is effective in accident prevention in nuclear power plants. Finally, we discuss some future problems of the development of PMT in nuclear power plants. (author)

  20. The economy of preventive maintenance of concrete bridges : final report.

    Science.gov (United States)

    2016-03-01

    The most economical approach to maintain existing concrete bridges is by adopting an active preventive maintenance : approach. An in-depth investigation of the combined deterioration effects of various deterioration mechanisms is needed : to establis...

  1. Demonstration of reliability centered maintenance

    International Nuclear Information System (INIS)

    Schwan, C.A.; Morgan, T.A.

    1991-04-01

    Reliability centered maintenance (RCM) is an approach to preventive maintenance planning and evaluation that has been used successfully by other industries, most notably the airlines and military. Now EPRI is demonstrating RCM in the commercial nuclear power industry. Just completed are large-scale, two-year demonstrations at Rochester Gas ampersand Electric (Ginna Nuclear Power Station) and Southern California Edison (San Onofre Nuclear Generating Station). Both demonstrations were begun in the spring of 1988. At each plant, RCM was performed on 12 to 21 major systems. Both demonstrations determined that RCM is an appropriate means to optimize a PM program and improve nuclear plant preventive maintenance on a large scale. Such favorable results had been suggested by three earlier EPRI pilot studies at Florida Power ampersand Light, Duke Power, and Southern California Edison. EPRI selected the Ginna and San Onofre sites because, together, they represent a broad range of utility and plant size, plant organization, plant age, and histories of availability and reliability. Significant steps in each demonstration included: selecting and prioritizing plant systems for RCM evaluation; performing the RCM evaluation steps on selected systems; evaluating the RCM recommendations by a multi-disciplinary task force; implementing the RCM recommendations; establishing a system to track and verify the RCM benefits; and establishing procedures to update the RCM bases and recommendations with time (a living program). 7 refs., 1 tab

  2. Optimal maintenance policy incorporating system level and unit level for mechanical systems

    Science.gov (United States)

    Duan, Chaoqun; Deng, Chao; Wang, Bingran

    2018-04-01

    The study works on a multi-level maintenance policy combining system level and unit level under soft and hard failure modes. The system experiences system-level preventive maintenance (SLPM) when the conditional reliability of entire system exceeds SLPM threshold, and also undergoes a two-level maintenance for each single unit, which is initiated when a single unit exceeds its preventive maintenance (PM) threshold, and the other is performed simultaneously the moment when any unit is going for maintenance. The units experience both periodic inspections and aperiodic inspections provided by failures of hard-type units. To model the practical situations, two types of economic dependence have been taken into account, which are set-up cost dependence and maintenance expertise dependence due to the same technology and tool/equipment can be utilised. The optimisation problem is formulated and solved in a semi-Markov decision process framework. The objective is to find the optimal system-level threshold and unit-level thresholds by minimising the long-run expected average cost per unit time. A formula for the mean residual life is derived for the proposed multi-level maintenance policy. The method is illustrated by a real case study of feed subsystem from a boring machine, and a comparison with other policies demonstrates the effectiveness of our approach.

  3. RoVi: Continuous transport infrastructure monitoring framework for preventive maintenance

    NARCIS (Netherlands)

    Seraj, Fatjon; Meratnia, Nirvana; Havinga, Paul J.M.

    2017-01-01

    Ground transport infrastructures require in-situ monitoring to evaluate their condition and deterioration and to design appropriate preventive maintenance strategies. Current monitoring practices provide accurate and detailed spatial measurements but often lack the required temporal resolution. This

  4. University of Tennessee - Industry collaborative research and development in preventive maintenance technology

    International Nuclear Information System (INIS)

    Upadhyaya, B.R.

    1992-01-01

    The Preventive Maintenance Engineering Laboratory (PMEL) was inaugurated at the University of Tennessee Nuclear Engineering Department in September 1989. The startup funding was provided by Gilbert/Commonwealth, Inc. The purpose of PMEL is to identify maintenance-related problems in the power and process industries and to find their solutions through the development and application of emerging technologies. These include advanced digital signal processing, applied artificial intelligence (AI), artificial neural networks, and reliability based methods. The Laboratory activities are being expanded by the formation of an industrial consortium within the Measurement and Control Engineering Center at the University of Tennessee. Several research and development projects in preventive maintenance are being carried out. These include condition monitoring of air operated valves, automated diagnostics of motor operated valves, instrument calibration, verification, and estimation of expected residual life of electric motors using applied AI technology and reliability-based methods. The new methodology will be applied to other industrial subsystems. A long-term research and development project is being sponsored by the T.V.A. Nuclear Maintenance Department. The overall objective of the research program is to develop and apply advanced artificial intelligence and information processing methods to the problems of plant performance monitoring and preventive maintenance. The program includes the development of a workstation/PC-based, networking of plant information for easy access to operational and management personnel, implementation of a sensor verification system, monitoring of feedwater flow venturi fouling and heat rate balance, and integration of signal validation, command validation, and fault-tolerant control strategies

  5. A methodology based in particle swarm optimization algorithm for preventive maintenance focused in reliability and cost

    International Nuclear Information System (INIS)

    Luz, Andre Ferreira da

    2009-01-01

    In this work, a Particle Swarm Optimization Algorithm (PSO) is developed for preventive maintenance optimization. The proposed methodology, which allows the use flexible intervals between maintenance interventions, instead of considering fixed periods (as usual), allows a better adaptation of scheduling in order to deal with the failure rates of components under aging. Moreover, because of this flexibility, the planning of preventive maintenance becomes a difficult task. Motivated by the fact that the PSO has proved to be very competitive compared to other optimization tools, this work investigates the use of PSO as an alternative tool of optimization. Considering that PSO works in a real and continuous space, it is a challenge to use it for discrete optimization, in which scheduling may comprise variable number of maintenance interventions. The PSO model developed in this work overcome such difficulty. The proposed PSO searches for the best policy for maintaining and considers several aspects, such as: probability of needing repair (corrective maintenance), the cost of such repairs, typical outage times, costs of preventive maintenance, the impact of maintaining the reliability of systems as a whole, and the probability of imperfect maintenance. To evaluate the proposed methodology, we investigate an electro-mechanical system consisting of three pumps and four valves, High Pressure Injection System (HPIS) of a PWR. Results show that PSO is quite efficient in finding the optimum preventive maintenance policies for the HPIS. (author)

  6. Preventive maintenance scheduling by variable dimension evolutionary algorithms

    International Nuclear Information System (INIS)

    Limbourg, Philipp; Kochs, Hans-Dieter

    2006-01-01

    Black box optimization strategies have been proven to be useful tools for solving complex maintenance optimization problems. There has been a considerable amount of research on the right choice of optimization strategies for finding optimal preventive maintenance schedules. Much less attention is turned to the representation of the schedule to the algorithm. Either the search space is represented as a binary string leading to highly complex combinatorial problem or maintenance operations are defined by regular intervals which may restrict the search space to suboptimal solutions. An adequate representation however is vitally important for result quality. This work presents several nonstandard input representations and compares them to the standard binary representation. An evolutionary algorithm with extensions to handle variable length genomes is used for the comparison. The results demonstrate that two new representations perform better than the binary representation scheme. A second analysis shows that the performance may be even more increased using modified genetic operators. Thus, the choice of alternative representations leads to better results in the same amount of time and without any loss of accuracy

  7. Preventative and predictive maintenance as a function of spare part management

    International Nuclear Information System (INIS)

    LaRose, R.; Sloski, P.

    2006-01-01

    Preventive and predictive maintenance has many aspects, such as vibration monitoring, lubricating oil analysis, thermography etc. This presentation focuses on the material and design application of sealing devices. (author)

  8. Development of digital I&C system in HTR-PM

    International Nuclear Information System (INIS)

    Shi Guilian

    2014-01-01

    Conclusions: HTR-PM DCS has been under execution for 5 years( 2009-2014) . It has taken CTEC 150 man/year so far. With close cooperation with INET, Chinergyand Shanghai Electric, CTEC overcame difficulties, like iterative design, voluminous customization work, new technology, and lacking of drawings. However, the accomplishment of the planned milestones prepared CTEC for the following work in HTR-PM DCS. 1. The 1ST integrated DCS, including safety DCS, non-safety DCS, DEH supplied by Chinese supplier. Rod control system and DEH are integrated in non-safety DCS. Simplified interface, integrated platform, and easy to use and maintenance. 2. CTEC obtained knowledge of 4th generation HTR-PM digital I&C, key design technology, and riched its DCS products by participation in HTRPM. HTR-PM Safety DCS project provided valuable experience for CTEC’s development and application of FIRMSYS, a safety protection control system platform. 3. The qualification solution by customized HTR-PM safety DCS prototype helps simply safety DCS design, V&V, qualification and safety review of the actual system, but results in some problems in system upgrade and maintenance. With the satisfactory application of FIRMSYS in 1000mw PWR and platform qualification , the future HTR-PM safety DCS could be provided based on a qualified safety DCS platform.

  9. Opportunities and supporting activities to promote preventive maintenance of NPPs in Japan

    International Nuclear Information System (INIS)

    Sanada, A.; Shinkawa, T.; Sakurada, M.

    1998-01-01

    With increase of the number of NPPs and operation history, enhancement of the safety regulation is becoming important for such long-operated NPPs. Centering on the comprehensive preventive maintenance, periodic safety reviews by utilities and its review and evaluation by MITI are in progress. The first reviews have not revealed essential and critical indications to be newly implemented. This means that the most of activities to secure reliability and safety have been done steadily. The present paper addresses the mechanism of on-going preventive maintenance and its essential elements: opportunities to identify issues and problems, and supporting activities to promote decision-makings on feedback, upgrading and modernization of NPPs. (author)

  10. Cost analysis of two-dimensional warranty for products with periodic preventive maintenance

    International Nuclear Information System (INIS)

    Huang, Yeu-Shiang; Gau, Wei-Yo; Ho, Jyh-Wen

    2015-01-01

    This study uses a bivariate approach, which simultaneously considers the time and usage of a repairable product, and takes into account periodic preventive maintenance to develop a two-dimensional warranty policy for the repairable product. The proposed model is based on the bivariate Weibull process to analyze the breakdown process of a repairable product simultaneously in terms of time and usage. A repairable product may be differently utilized by various customers. We consider two types of customers: (1) customers whose product warranty is terminated because the warranty time limit has reached first; (2) customers whose product warranty is terminated because the warranty usage limit has reached first, to perform cost analyses for determining an appropriate warranty policy. However, since it is often the case that the repairable product may be equally likely purchased by the two types of customers who are equivalently important to the product manufacturer; the optimal warranty policy would thus be the equilibrium solution of the cost analyses which pay the same attention to both types of customers in order to maximize the total profit of the manufacturer. - Highlights: • We use a bivariate method to model the breakdown process. • We consider a periodic PM schedule. • We obtain an optimal two-dimensional warranty policy considering various customers. • The optimal 2D warranty is an equilibrium which satisfies both seller and buyer

  11. Optimizing production and imperfect preventive maintenance planning's integration in failure-prone manufacturing systems

    International Nuclear Information System (INIS)

    Aghezzaf, El-Houssaine; Khatab, Abdelhakim; Tam, Phuoc Le

    2016-01-01

    This paper investigates the issue of integrating production and maintenance planning in a failure-prone manufacturing system. It is assumed that the system's operating state is stochastically predictable, in terms of its operating age, and that it can accordingly be preventively maintained during preplanned periods. Preventive maintenance is assumed to be imperfect, that is when performed, it brings the manufacturing system to an operating state that lies between ‘as bad as old’ and ‘as good as new’. Only an overhauling of the system brings it to a ‘as good as new’ operating state again. A practical integrated production and preventive maintenance planning model, that takes into account the system's manufacturing capacity and its operational reliability state, is developed. The model is naturally formulated as a mixed-integer non-linear optimization problem, for which an extended mixed-integer linear reformulation is proposed. This reformulation, while it solves the proposed integrated planning problem to optimality, remains quite demanding in terms of computational time. A fix-and-optimize procedure, that takes advantage of some properties of the original model, is then proposed. The reformulation and the fix-and-optimize procedure are tested on some test instances adapted from those available in the literature. The results show that the proposed fix-and-optimize procedure performs quite well and opens new research direction for future improvements. - Highlights: • Integration of production planning and imperfect preventive maintenance is explored. • Imperfect maintenance is modeled using a fitting age reduction hybrid hazard rate. • A practical approximate optimization model for this integration is proposed. • The resulting naturally MINL optimization model is reformulated and solved as a MILP. • An effective fix-and-optimize procedure is proposed for large instances of this MILP.

  12. Strategy and Management Guideline on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    An action-oriented and practical guideline for the planning, organisation and management of preventive school maintenance in Eritrea. The manual is the result of a participatory planning process which has involved actors at the school and community level, district levels and the national policy...

  13. DEVELOPMENT OF MATHEMATICAL MODELS FOR OPTIMAL PREVENTIVE MAINTENANCE POLICY IN A STEEL INDUSTRY : SIX SIGMA APPROACH

    Directory of Open Access Journals (Sweden)

    N. V. R. Naidu

    2011-09-01

    Full Text Available This paper deals with a critical evaluation of the Preventive Maintenance system in steel industry. This study helps in implementing Six Sigma solutions to reduce the down time of two critical machines i.e., Electric Arc Furnace (EAF and Billet Casting Machine (BCM. It is clear from the analysis of EAF and BCM respectively that, variations in output are quite possible because the machines output not only depend on maintenance time but also on several other variables. Further, the objective is to design a preventive maintenance programme on the same equipment situated in the plant using Six Sigma. The breakdown of these equipments could very well affect the production rate. For this, the mathematical models have been developed and these models are used to obtain the optimum preventive maintenance frequency for minimizing the down time and maximizing the profits.

  14. Maintenance of CERN telephone exchanges

    CERN Multimedia

    2005-01-01

    A maintenance of CERN telephone exchanges will be performed on 21st, 22nd, 23rd, 24th of September from 7 p.m. to 9 p.m. Disturbances or even interruptions of telephony services may occur during this lapse of time. We apology in advance for any inconveniences that this may cause.

  15. Development of a Preventive Maintenance Program for Tooling Used in Powder Slush Molding

    Energy Technology Data Exchange (ETDEWEB)

    Lara-Curzio, Edgar [ORNL; Rios, Orlando [ORNL; Marquez Rossy, Andres E [ORNL

    2016-07-19

    ORNL collaborated with Faurecia Interior Systems to investigate the feasibility of developing a thermomagnetic preventive maintenance program for nickel tooling used in powder slush molding. It was found that thermal treatments at temperatures greater than 500°C can anneal strain hardening in nickel tooling and a range of temperatures and times for effective thermal annealing were identified. It was also observed that magnetic fields applied during thermal annealing do not alter the kinetics of strain hardening annealing. The results obtained in this investigation provide a foundation for establishing a preventive maintenance program for nickel tooling.

  16. SAP R/3 plant maintenance making it work for your business

    CERN Document Server

    Stengl, Britta

    2001-01-01

    SAP R/3 Plant Maintenance offers a clear introduction to this small but sophisticated component and provides a highly practical guide to implementing PM. Beginning with a examination of the key business processes underlying PM functionality, the book goes on to cover all the crucial aspects of maintenance planning and execution in R/3. Particular attention is given to integrating plant maintenance with a company's natural process flow.

  17. An Enhanced Preventive Maintenance Optimization Model Based on a Three-Stage Failure Process

    Directory of Open Access Journals (Sweden)

    Ruifeng Yang

    2015-01-01

    Full Text Available Nuclear power plants are highly complex systems and the issues related to their safety are of primary importance. Probabilistic safety assessment is regarded as the most widespread methodology for studying the safety of nuclear power plants. As maintenance is one of the most important factors for affecting the reliability and safety, an enhanced preventive maintenance optimization model based on a three-stage failure process is proposed. Preventive maintenance is still a dominant maintenance policy due to its easy implementation. In order to correspond to the three-color scheme commonly used in practice, the lifetime of system before failure is divided into three stages, namely, normal, minor defective, and severe defective stages. When the minor defective stage is identified, two measures are considered for comparison: one is that halving the inspection interval only when the minor defective stage is identified at the first time; the other one is that if only identifying the minor defective stage, the subsequent inspection interval is halved. Maintenance is implemented immediately once the severe defective stage is identified. Minimizing the expected cost per unit time is our objective function to optimize the inspection interval. Finally, a numerical example is presented to illustrate the effectiveness of the proposed models.

  18. Aging management and preventive maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    Bessho, Toichi; Sagawa, Wataru; Oyamada, Osamu; Uchida, Shunsuke

    1995-01-01

    It is expected that nuclear power generation will bear main electric power supply for long term. For this purpose, by applying proper preventive maintenance to the nuclear power plants in operation, the maintenance of high reliability and the rate of plant operation is extremely important. Especially it has been strongly demanded to execute efficiently the periodic inspection which is carried out every year to shorten its period and increase the rate of operation, and to maintain the reliability by the proper maintenance for the aged plants with long operation years. As to efficient and short periodic inspection, the preparation is advanced by the guidance of electric power companies aiming at realizing it in nearest fiscal year, and further, effort is exerted for the development of technology in long term to optimize periodic inspection. For securing the reliability of aged plants, it is important to do proper inspection and diagnosis and to take the countermeasures by repair and replacement, based on the grasp of secular change mechanism and the evaluation of life of machinery, equipment and materials. In particular, effort is exerted for the development of maintenance technology for reactor pressure vessels and in-core equipment which are hard to access. The confirmation of the function of remote operation equipment and the establishment of execution condition are carried out by uisng the full scale mock-up of BWR plant. The problems in maintenance service and the activities and results of reliability improvement are reported. (K.I.)

  19. The Preventive Signaling Maintenance Crew Scheduling Problem for European Railway Traffic Management system (ERTMS)

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad; Stidsen, Thomas Jacob Riis; Rasmussen, Kourosh Marjani

    , the western part of Denmark. This case is particularly interesting, since the entire railway signalling system is currently being upgraded to the new European Railway Traffic Management System (ERTMS) standard. The new signals need continuous maintenance and in this article we plan the distribution of crew......A railway system is a large and complex infrastructure, which requires continuous maintenance in order to function correctly. Proper maintenance is critical but can also be costly. In this paper we consider the practical case of planning the preventive maintenance of railway signals in Jutland...

  20. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)

  1. Performance deterioration modeling and optimal preventive maintenance strategy under scheduled servicing subject to mission time

    Directory of Open Access Journals (Sweden)

    Li Dawei

    2014-08-01

    Full Text Available Servicing is applied periodically in practice with the aim of restoring the system state and prolonging the lifetime. It is generally seen as an imperfect maintenance action which has a chief influence on the maintenance strategy. In order to model the maintenance effect of servicing, this study analyzes the deterioration characteristics of system under scheduled servicing. And then the deterioration model is established from the failure mechanism by compound Poisson process. On the basis of the system damage value and failure mechanism, the failure rate refresh factor is proposed to describe the maintenance effect of servicing. A maintenance strategy is developed which combines the benefits of scheduled servicing and preventive maintenance. Then the optimization model is given to determine the optimal servicing period and preventive maintenance time, with an objective to minimize the system expected life-cycle cost per unit time and a constraint on system survival probability for the duration of mission time. Subject to mission time, it can control the ability of accomplishing the mission at any time so as to ensure the high dependability. An example of water pump rotor relating to scheduled servicing is introduced to illustrate the failure rate refresh factor and the proposed maintenance strategy. Compared with traditional methods, the numerical results show that the failure rate refresh factor can describe the maintenance effect of servicing more intuitively and objectively. It also demonstrates that this maintenance strategy can prolong the lifetime, reduce the total lifetime maintenance cost and guarantee the dependability of system.

  2. Hybrid Optimization Algorithm of Particle Swarm Optimization and Cuckoo Search for Preventive Maintenance Period Optimization

    Directory of Open Access Journals (Sweden)

    Jianwen Guo

    2016-01-01

    Full Text Available All equipment must be maintained during its lifetime to ensure normal operation. Maintenance is one of the critical roles in the success of manufacturing enterprises. This paper proposed a preventive maintenance period optimization model (PMPOM to find an optimal preventive maintenance period. By making use of the advantages of particle swarm optimization (PSO and cuckoo search (CS algorithm, a hybrid optimization algorithm of PSO and CS is proposed to solve the PMPOM problem. The test functions show that the proposed algorithm exhibits more outstanding performance than particle swarm optimization and cuckoo search. Experiment results show that the proposed algorithm has advantages of strong optimization ability and fast convergence speed to solve the PMPOM problem.

  3. Preventive maintenance - An important element in the `risk management` philosophy

    Energy Technology Data Exchange (ETDEWEB)

    Gullev, Lars [VEKS (Denmark)

    1996-11-01

    The contents of the paper is a presentation of the company VEKS with particular focus on the connection between preventive maintenance and the `Risk Management` philosophy. Implementation of Risk Management was preferred instead of an ISO-9000 certification of the company. The experience is that the responsibility in the organisation has been increased. (au)

  4. An approach to integrating surveillance and maintenance tasks to prevent the dominant failure causes of critical components

    International Nuclear Information System (INIS)

    Martorell, S.; Munoz, A.; Serradell, V.

    1995-01-01

    Surveillance requirements and maintenance activities in a nuclear power plant aim to preserve components' inherent reliability. Up to now, predictive and preventive maintenance mainly concerned plant staff, but the US Nuclear Regulatory Commission Maintenance Rule released in July 1991 will have significant impact on how nuclear power plants perform and document this maintenance. Reliability Centered Maintenance (RCM) is a systematic methodology to establish maintenance tasks for critical components in plant with a high degree of compliance with the goals of the Rule. RCM pursues the identification of applicable and efficient tasks to prevent these components from developing their dominant failure causes, and, in turn, towards achieving proper levels of components availability with low cost. In this paper, we present an approach for identifying the most suitable set of tasks to achieve this goal, which involves the integration of maintenance activities and surveillance requirements for each critical component based on the unavailability and cost associated with each individual task which is performed on it

  5. Maintenance of CERN telephone exchanges - erratum

    CERN Document Server

    2005-01-01

    The next maintenance of CERN telephone exchanges will be performed on 19th, 20th, 21st, and 22nd of September from 7 p.m. to 9 p.m. Disturbances or even interruptions of telephony services may occur during this lapse of time. We apology in advance for any inconveniences that this may cause.

  6. 75 FR 29537 - Draft Transportation Conformity Guidance for Quantitative Hot-spot Analyses in PM2.5

    Science.gov (United States)

    2010-05-26

    ... Quantitative Hot- spot Analyses in PM 2.5 and PM 10 Nonattainment and Maintenance Areas AGENCY: Environmental... finalized, this guidance would help state and local agencies complete quantitative PM 2.5 and PM 10 hot-spot... projects. A hot-spot analysis includes an estimation of project-level emissions, air quality modeling, and...

  7. Modeling of preventive maintenance changes influence upon flight safety indexes

    Directory of Open Access Journals (Sweden)

    А.В. Гончаренко

    2004-03-01

    Full Text Available  It is considered a simplified model of connection between the catastrophic events flow frequency and both preventive maintenance changes periodicity and diagnosis depth of aviation equipment. It is deduced specific formulas for computing the changes and diagnostics parameters influence upon the values of both the catastrophic events flow frequency and technical-economical control factor criterion of flight safety levels.

  8. PWSCC Preventive Maintenance Activities for Alloy 600 in Japanese PWR Plants

    International Nuclear Information System (INIS)

    Yamamoto, K.; Sugimoto, N.; Onishi, K.; Okimura, K.

    2012-01-01

    Because many nuclear plants have been in operation for ages, the importance of preventive maintenance technologies is getting higher. One conspicuous problem found in pressurized water reactor (PWR) plants is the primary water stress corrosion cracking (PWSCC) observed in Alloy 600 (a kind of high nickel based alloy) parts. Alloy 600 was used for butt welds between low alloy steel and stainless steel of nozzles of Reactor Vessel (RV), Steam Generator (SG), and Pressurizer (Pz). As PWSCC occurred at these parts may cause Loss of Coolant Accident (LOCA), preventive maintenance is necessary. PWSCC is considered to be caused by a mixture of three elements: high residual tensile stress on surface, material (Alloy 600) and environment. PWSCC can be prevented by improving one of the elements. MHI has been developing stress improvement methods, for example, Water Jet Peening (WJP), Shot Peening by Ultrasonic vibration (USP), and Laser Stress Improvement Process (L-SIP). According to the situation, appropriate method is applied for each part. WJP has been applied for RV nozzles of a lot of plants in Japan. However PWSCC was observed in RV nozzles during the inspection before WJP in recent years, MHI developed the Advanced INLAY system to improve the material from Alloy 600 to Alloy 690. Alloy 600 on the inner surface of the nozzles is removed and welding with Alloy 690 is performed. In addition, heat treatments for the nozzles are difficult for its structural situation, so ambient temperature temper bead welding technique for RV nozzles was developed to make the heat treatments unnecessary. This paper describes countermeasures against PWSCC and introduces the maintenance activities performed in Japan. (author)

  9. Preventive maintenance instrumentation results in Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Curiel, M.; Palomo, M. J.; Verdu, G.; Arnaldos, A.

    2010-10-01

    This paper is a recompilation of the most significance results in relation to the researching in preventive and predictive maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and the Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the power plants control and instrumentation department's technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the object to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish nuclear power plants each of them shall give a significant contribution to problem resolution and power plant performance. (Author)

  10. Preventive maintenance and load testing of fixed position cranes in support of major operations

    International Nuclear Information System (INIS)

    Detrick, C.K.

    1980-01-01

    This paper will address load testing and preventive maintenance of fixed in-place cranes in general, and maintenance and load testing of the 200 ton Polar Gantry Crane at the FFTF in particular. This paper also covers the installation of a 100-ton bridge crane in the FFTF's Reactor Service Building, as well as use of these cranes in making important lifts of FFTF equipment

  11. EPR design for maintenance

    International Nuclear Information System (INIS)

    Krugmann, U.

    1998-01-01

    Preventive maintenance is very important in achieving high plant availability. For the European Pressurized Reactor (EPR) preventive maintenance has been carefully addressed in the design stage. This is particularly necessary because of the traditionally different maintenance strategies employed in France and Germany. This paper emphasizes the following features introduced in the ERP design to minimize the duration of the refueling outage: (1) containment accessibility during power operation; (2) overall plant layout to facilitate inspections and maintenances within the containment; and (3) safety system design for enabling preventive maintenance during power operation. (author)

  12. Joint Optimization of Preventive Maintenance and Spare Parts Inventory with Appointment Policy

    Directory of Open Access Journals (Sweden)

    Jing Cai

    2017-01-01

    Full Text Available Under the background of the wide application of condition-based maintenance (CBM in maintenance practice, the joint optimization of maintenance and spare parts inventory is becoming a hot research to take full advantage of CBM and reduce the operational cost. In order to avoid both the high inventory level and the shortage of spare parts, an appointment policy of spare parts is first proposed based on the prediction of remaining useful lifetime, and then a corresponding joint optimization model of preventive maintenance and spare parts inventory is established. Due to the complexity of the model, the combination method of genetic algorithm and Monte Carlo is presented to get the optimal maximum inventory level, safety inventory level, potential failure threshold, and appointment threshold to minimize the cost rate. Finally, the proposed model is studied through a case study and compared with both the separate optimization and the joint optimization without appointment policy, and the results show that the proposed model is more effective. In addition, the sensitivity analysis shows that the proposed model is consistent with the actual situation of maintenance practices and inventory management.

  13. Penerapan Preventive Maintenance Untuk Meningkatkan Reliability Pada Boiler Feed Pump PLTU Tarahan Unit 3 & 4

    OpenAIRE

    Saputra, Melki

    2015-01-01

    Pemeliharaan dan perawatan merupakan kegiatan untuk menjamin mesin dapat bekerja sebagaimana mestinya. Pemeliharaan dan perawatan menyeluruh untuk meningkatkan produktivitas perusahaan dikenal dengan Preventive Maintenance. pemeliharaan keterlibatan operator melalui kegiatan autonomous maintenance. PT. PLN (Persero) Pembangkitan Sumatera Bagian Selatan Sektor Tarahan merupakan salah satu perusahaan penghasil listrik dan semua mesinnya beroperasi selama 24 jam. Beroperasinya mesin secara c...

  14. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  15. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    IT/CS

    2014-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and 2 a.m. on 26 August.   Fixed-line telephone and audio-conference services may be disrupted during this intervention. Nevertheless, the CCC and the Fire Brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work.

  16. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 20 November. Fixed-line telephone and audioconference services may be disrupted while the work is being carried out. However, the CCC and the fire brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. For further details about the maintenance work, please contact the telephone switchboard on 76111 or by email. Telecom Section - IT/CS

  17. Preventive maintenance instrumentation results in Spanish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Curiel, M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Palomo, M. J.; Verdu, G. [ISIRYM, Universidad Politecnica de Valencia, Camino de Vera s/n, Valencia (Spain); Arnaldos, A., E-mail: m.curiel@lainsa.co [TITANIA Servicios Tecnologicos SL, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain)

    2010-10-15

    This paper is a recompilation of the most significance results in relation to the researching in preventive and predictive maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and the Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the power plants control and instrumentation department's technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the object to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish nuclear power plants each of them shall give a significant contribution to problem resolution and power plant performance. (Author)

  18. Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems

    International Nuclear Information System (INIS)

    Geetha, T.; Swarup, K. Shanti

    2009-01-01

    Preventive maintenance of generating units and lines, in a competitive electric energy environment is proposed. Inclusion of transmission constraints and forced outage rates, over a specified operational period is considered. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period, for which Bender's decomposition technique is used. The objective of the GENCO is to maximize profit or to minimize loss in profit, for which transmission constrained price based unit commitment (TCPBUC), based on Lagrangian relaxation method is used. Bender's decomposition technique is used for line maintenance, with adequate level of reliability. A coordinating technique using penalty factors is incorporated to obtain convergence of the conflicting objectives. The transmission constraints are modeled using dc sensitivity factors. Detailed case studies of six-bus systems and IEEE RTS system are presented and discussed. (author)

  19. Leadership PM: Theory and practice

    International Nuclear Information System (INIS)

    Misumi, J.

    1997-01-01

    A leadership concept which is designed to overcome the limitations of the commonly used behavioral classification scheme is presented. In this PM concept, P stands for performance and M for maintenance. Measuring each characteristic on an axis between ''high'' and ''low'', four distinct types of leadership could be identified. The model was tested in laboratory studies and field surveys of different organizations. (author). 8 refs, 1 fig., 2 tabs

  20. Mobile network maintenance (GSM)

    CERN Multimedia

    IT Department

    2009-01-01

    Maintenance work will be carried out on the CERN mobile network infrastructure (GSM) on the 23 and 24 July from 6 p.m. to 6 a.m. in order to replace discontinued equipment and to increase the bandwidth capacity of the GSM mobile network. All CERN GSM emitters (40 units) will be moved one by one to the new infrastructure during the maintenance. The call of a user connected to an emitter at the time of its maintenance will be cut off. However, the general overlapping of the GSM radio coverage should mean that users are able immediately to call again should their call be interrupted. IT/CS/CS

  1. Constrained non-linear multi-objective optimisation of preventive maintenance scheduling for offshore wind farms

    Science.gov (United States)

    Zhong, Shuya; Pantelous, Athanasios A.; Beer, Michael; Zhou, Jian

    2018-05-01

    Offshore wind farm is an emerging source of renewable energy, which has been shown to have tremendous potential in recent years. In this blooming area, a key challenge is that the preventive maintenance of offshore turbines should be scheduled reasonably to satisfy the power supply without failure. In this direction, two significant goals should be considered simultaneously as a trade-off. One is to maximise the system reliability and the other is to minimise the maintenance related cost. Thus, a non-linear multi-objective programming model is proposed including two newly defined objectives with thirteen families of constraints suitable for the preventive maintenance of offshore wind farms. In order to solve our model effectively, the nondominated sorting genetic algorithm II, especially for the multi-objective optimisation is utilised and Pareto-optimal solutions of schedules can be obtained to offer adequate support to decision-makers. Finally, an example is given to illustrate the performances of the devised model and algorithm, and explore the relationships of the two targets with the help of a contrast model.

  2. Optimum policies for a system with general imperfect maintenance

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Lin, Y.-B.; Liao, G.-L.

    2006-01-01

    This study considers periodic preventive maintenance policies, which maximizes the availability of a repairable system with major repair at failure. Three types of preventive maintenance are performed, namely: imperfect preventive maintenance (IPM), perfect preventive maintenance (PPM) and failed preventive maintenance (FPM). The probability that preventive maintenance is perfect depends on the number of imperfect maintenances conducted since the previous renewal cycle, and the probability that preventive maintenance remains imperfect is not increasing. The optimum preventive maintenance time that maximizes availability is derived. Various special cases are considered. A numerical example is given

  3. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  4. Air Pollution Quality Index (AQI and Density of PM1, PM2.5 and PM10 in the Air of Qom

    Directory of Open Access Journals (Sweden)

    Safdari M

    2011-06-01

    Full Text Available Background and Objectives: Air pollution has broad social, economical, political and technical aspects. one of the major issues in this regard is taking measures to prevent its increase. Since suspended particles are among the standard pollutants, the present study was carried out with the aim of measuring the amounts of these particles.Methods: In the present study, the suspended particles ( PM1, PM2.5 and PM10 were measured at two sites in Qom city. For each of them, 60 samples were selected with the Enviro Check during five consecutive months during summer (2 months and fall.Results: During sampling, PM10 in the period between October 22'th to November 22nd 2007 had the maximum amount with the mean of 117µg/m3 and in the period between September 22'th to October 22nd 2007 it had the minimum amount with the mean of 83µg/m3. PM2.5 in the period between November 22nd to December 22nd 2007 with the mean of 33µg/m3 had the maximum amount and in the period between July 22nd to October 22nd 2007 it had the minimum amount with the mean of 8µg/m3. Conclusion: Based on the findings of this study, the densities of suspended particles PM1, PM2.5 and PM10 were below the standard levels on most occasions. The amounts of AQI for them were normal and acceptable.

  5. LHCb: Evidence of CP violation in charmless three-body decays $B^\\pm\\rightarrow K^\\pm\\pi^+\\pi^-$, $B^\\pm\\rightarrow K^\\pm K^+K^-$, $B^\\pm\\rightarrow K^+ K^-\\pi^\\pm$ and $B^\\pm\\rightarrow \\pi^\\pm\\pi^+\\pi^-$

    CERN Multimedia

    Lopes, J H

    2013-01-01

    Evidence of CP violation in charmless three-body decays $B^\\pm\\rightarrow K^\\pm\\pi^+\\pi^-$, $B^\\pm\\rightarrow K^\\pm K^+K^-$, $B^\\pm\\rightarrow K^+ K^-\\pi^\\pm$ and $B^\\pm\\rightarrow \\pi^\\pm\\pi^+\\pi^-$

  6. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 20 November. Fixed-line telephone and audioconference services may be disrupted while the work is being carried out. However, the CCC and the fire brigade will be contactable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. For further details about the maintenance work, please contact the telephone switchboard on 76111 or by email to standard.telephone@cern.ch. Telecom Section IT/CS

  7. Presenting a model of repair and preventing maintenance of Bushehr nuclear power plants analyzing the data of similar nuclear power plants

    International Nuclear Information System (INIS)

    Parikhan, Hammidreza

    1997-01-01

    Due to the increase application of nuclear energy for producing electricity, special attention must be paid to their maintenance activities in general and preventive maintenance in particular. It has been shown that a well established preventive maintenance programme will enhance the reliability and availability of nuclear power plants. A model of preventive maintenance for Buhehr nuclear power plant which is due to be completed by 2001 is developed. The prescribed model is based on past experiences of VVER nuclear power plants around the world. The utilized data is provided by International Atomic Energy Agency (IAEA) in Vienna, Austria. The data and past experiences reveal such important information as availability, energy loss, types of failures, duration of failure, etc. A strategy for designing a database is established. These data are then analyzed by statistical methods such as Pareto analysis, t-test, K-S test, analysis of variance, etc. The results of our analysis reveal important information in regard to establishment of a well-defined preventive maintenance programme in Buhshehr nuclear power plant. The results show that certain equipment such turbo-generator and control-rods play an important role in the maintenance of a VVER nuclear power plant. Other findings are discussed in great detail

  8. Proposal for monitoring concrete painting as a preventive maintenance tool (Abutments and pier caps).

    Science.gov (United States)

    2017-07-01

    One of the growing number of preventive bridge maintenance activities conducted by the Kentucky Transportation Cabinet (KYTC) is washing and applying thin film protective coatings to bridge abutments and piers. Previous work conducted by Kentucky Tra...

  9. Preventive maintenance program for a research and production reactor

    International Nuclear Information System (INIS)

    Rico, N.A.

    1990-01-01

    This program proposes a simple, rapid and efficient methodology for the task of developing a really preventive maintenance discipline. Moreover, the lower cost of its application -since it must satisfy the plant's budget-. To this purpose, an extremely economical and easily obtainable infrastructure is proposed. The following stage is referred to the commissioning system, subsequent supervision and follow-up. The experience gained from the two reactors as RA-6 (Bariloche Atomic Center) and NUR (RAE) of Argelia. Finally, the interacting characteristic of this program, since it may be rapidly adapted to different dimensions of plants, laboratories, etc., must be pointed out. (Author) [es

  10. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  11. New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization

    International Nuclear Information System (INIS)

    Samrout, M.; Yalaoui, F.; Cha-hat telet, E.; Chebbo, N.

    2005-01-01

    This article is based on a previous study made by Bris, Chatelet and Yalaoui [Bris R, Chatelet E, Yalaoui F. New method to minimise the preventive maintenance cost of series-parallel systems. Reliab Eng Syst Saf 2003;82:247-55]. They use genetic algorithm to minimize preventive maintenance cost problem for the series-parallel systems. We propose to improve their results developing a new method based on another technique, the Ant Colony Optimization (ACO). The resolution consists in determining the solution vector of system component inspection periods, T P . Those calculations were applied within the programming tool Matlab. Thus, highly interesting results and improvements of previous studies were obtained

  12. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  13. Condition-based maintenance effectiveness for series–parallel power generation system—A combined Markovian simulation model

    International Nuclear Information System (INIS)

    Azadeh, A.; Asadzadeh, S.M.; Salehi, N.; Firoozi, M.

    2015-01-01

    Condition-based maintenance (CBM) is an increasingly applicable policy in the competitive marketplace as a means of improving equipment reliability and efficiency. Not only has maintenance a close relationship with safety but its costs also make it even more attractive issue for researchers. This study proposes a model to evaluate the effectiveness of CBM policy compared to two other maintenance policies: Corrective Maintenance (CM) and Preventive Maintenance (PM). Maintenance policies are compared through two system performance indicators: reliability and cost. To estimate the reliability and costs of the system, the proposed Markovian discrete-event simulation model is developed under each of these policies. The applicability and usefulness of the proposed Markovian simulation model is illustrated for a series–parallel power generation system. The simulated characteristics of CBM system include its prognostics efficiency to estimate remaining useful life of the equipment. Results show that with an efficient prognostics, CBM policy is an effective strategy compared to other maintenance strategies. - Highlights: • A model is developed to evaluate the effectiveness of CBM policy. • Maintenance policies are compared through reliability and cost. • A Markovian simulation model is developed. • A series–parallel power generation system is considered. • CBM is an effective strategy compared to others

  14. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work on the CERN telephone exchanges will be performed on 10 July from 8 p.m. to midnight. During this intervention, the fixed telephone services, audioconference services and GSM calls made via the 333 prefix may be disrupted. However, the CCC and the fire brigade will be reachable at all times. For more details about this maintenance work, please call the telephone switchboard on 76111 or send an e-mail. Telecom SectionIT/CS

  15. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    A maintenance of the CERN telephone exchanges will be performed on the 10th of July from 8 p.m. to midnight. During this intervention, the fixed telephone services, audioconference services, and GSM calls made via the 333 prefix may be disrupted. However, the CCC and the fire brigade will be reachable at any time. For more details about this maintenance, please contact the telephone switchboard at 76111 or by email. Telecom Section IT/CS

  16. Opportunistic maintenance considering non-homogenous opportunity arrivals and stochastic opportunity durations

    International Nuclear Information System (INIS)

    Truong Ba, H.; Cholette, M.E.; Borghesani, P.; Zhou, Y.; Ma, L.

    2017-01-01

    Many systems and manufacturing processes undergo intermittent operation due to external factors (e.g. weather, low market prices), offering opportunities to conduct maintenance with reduced production losses. Making use of appropriate opportunities can thus lead to significant reduction in the total cost of maintenance and improvement in productivity. In this paper, an opportunistic maintenance (OM) model is developed considering two critical properties of real world opportunities: (i) non-homogeneous opportunity arrivals and (ii) stochastic opportunity duration. The model enables exploiting downtime cost savings from “partial” opportunities (stops shorter than the required maintenance time) thus extending the potential benefit of OM. The criteria for accepting maintenance opportunities are found by minimizing the single-cycle total cost. A closed form expression of the single-cycle total cost is derived for a given PM/OM policy and then a Genetic Algorithm is used to solve the optimization problem. Numerical results are presented to assess the benefit of opportunistic maintenance and the marginal benefit of considering partial opportunities. Results indicate that significant savings can be achieved by considering OM. Moreover, it is shown that the novel consideration of partial opportunities significantly increase the benefit of OM. - Highlights: • Opportunistic and time-based preventive maintenance jointly optimized. • Non-homogeneous opportunity arrivals and stochastic durations considered. • “Partial” opportunities considered for the first time. • Opportunity duration thresholds used as a decision criterion. • Numerical study conducted to evaluate benefit of optimized policy.

  17. Development of a knowledge-based information management system for plant maintenance

    International Nuclear Information System (INIS)

    Yim, Hyung Sang; Park, Young Jae; Lee, Sang Min; Choi, Jae Boong; Kim, Young Jin; Roh, Eun Chul; Lee, Byung Ine

    2003-01-01

    Recently, the importance of Plant Maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as Risk-Based Inspection(RBI), Fitness For Service guidelines(FFS), Plant Lifecycle Management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance

  18. Development of a knowledge-based information management system for plant maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Hyung Sang; Park, Young Jae; Lee, Sang Min; Choi, Jae Boong; Kim, Young Jin [Sungkyunkwan Univ., Seoul (Korea, Republic of); Roh, Eun Chul; Lee, Byung Ine [Pohang Iron and Steel Company, Pohang (Korea, Republic of)

    2003-07-01

    Recently, the importance of Plant Maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as Risk-Based Inspection(RBI), Fitness For Service guidelines(FFS), Plant Lifecycle Management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance.

  19. Preventive maintenance instrumentation results in Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Palomo Anaya, M. Jose; Verdu Martin, Gumersindo; Arnaldos Gonzalvez, Adoracion; Nieva, Marcelino Curiel

    2011-01-01

    This paper is a recompilation of the most significant results in relation to the researching in Preventive and Predictive Maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and The Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the Power Plants Control and Instrumentation Department technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the aim to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish Nuclear Power Plants each of them shall give a significant contribution to problem resolution and power plant performance: Fluctuations in sensor lines (case 1), Air presence in feed water lines (case 2), Root valve partially closed (case 3), Sensor malfunctions (case 4), Electrical source malfunctions (case 5), RTD malfunctions (case 6) and LPRM malfunctions (case 7). (author)

  20. Preventive maintenance instrumentation results in Spanish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Palomo Anaya, M. Jose; Verdu Martin, Gumersindo, E-mail: mpalomo@iqn.upv.es, E-mail: gverdu@iqn.upv.es [ISIRYM Universidad Politecnica de Valencia, Valencia (Spain); Arnaldos Gonzalvez, Adoracion, E-mail: a.arnaldos@titaniast.com [TITANIA Servicios Tecnologicos SL, Valencia (Spain); Nieva, Marcelino Curiel, E-mail: m.curiel@lainsa.com [Logistica y Acondicionamientos Industriales SAU (LAINSA), Valencia (Spain)

    2011-07-01

    This paper is a recompilation of the most significant results in relation to the researching in Preventive and Predictive Maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and The Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the Power Plants Control and Instrumentation Department technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the aim to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish Nuclear Power Plants each of them shall give a significant contribution to problem resolution and power plant performance: Fluctuations in sensor lines (case 1), Air presence in feed water lines (case 2), Root valve partially closed (case 3), Sensor malfunctions (case 4), Electrical source malfunctions (case 5), RTD malfunctions (case 6) and LPRM malfunctions (case 7). (author)

  1. Webinar: Making the Connection: Linking IAQ, Energy Efficiency and Preventive Maintenance Together for Healthy Schools

    Science.gov (United States)

    A page to register to view the February 22, 2018, Energy Savings Plus Health for Schools Webinar Series Webinar: Making the Connection: Linking IAQ, Energy Efficiency and Preventive Maintenance Together for Healthy Schools

  2. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  3. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  4. The ovarian DNA damage repair response is induced prior to phosphoramide mustard-induced follicle depletion, and ataxia telangiectasia mutated inhibition prevents PM-induced follicle depletion

    Energy Technology Data Exchange (ETDEWEB)

    Ganesan, Shanthi, E-mail: shanthig@iastate.edu; Keating, Aileen F., E-mail: akeating@iastate.edu

    2016-02-01

    Phosphoramide mustard (PM) is an ovotoxic metabolite of cyclophosphamide and destroys primordial and primary follicles potentially by DNA damage induction. The temporal pattern by which PM induces DNA damage and initiation of the ovarian response to DNA damage has not yet been well characterized. This study investigated DNA damage initiation, the DNA repair response, as well as induction of follicular demise using a neonatal rat ovarian culture system. Additionally, to delineate specific mechanisms involved in the ovarian response to PM exposure, utility was made of PKC delta (PKCδ) deficient mice as well as an ATM inhibitor (KU 55933; AI). Fisher 344 PND4 rat ovaries were cultured for 12, 24, 48 or 96 h in medium containing DMSO ± 60 μM PM or KU 55933 (48 h; 10 nM). PM-induced activation of DNA damage repair genes was observed as early as 12 h post-exposure. ATM, PARP1, E2F7, P73 and CASP3 abundance were increased but RAD51 and BCL2 protein decreased after 96 h of PM exposure. PKCδ deficiency reduced numbers of all follicular stages, but did not have an additive impact on PM-induced ovotoxicity. ATM inhibition protected all follicle stages from PM-induced depletion. In conclusion, the ovarian DNA damage repair response is active post-PM exposure, supporting that DNA damage contributes to PM-induced ovotoxicity. - Highlights: • PM exposure induces DNA damage repair gene expression. • Inhibition of ATM prevented PM-induced follicle depletion. • PKCδ deficiency did not impact PM-induced ovotoxicity.

  5. Observation of the suppressed ADS modes $B^\\pm \\to [\\pi^\\pm K^\\mp \\pi^+\\pi^-]_D K^\\pm$ and $B^\\pm \\to [\\pi^\\pm K^\\mp \\pi^+\\pi^-]_D \\pi^\\pm$

    CERN Document Server

    INSPIRE-00258707; Abellan Beteta, C; Adeva, B; Adinolfi, M; Adrover, C; Affolder, A; Ajaltouni, Z; Albrecht, J; Alessio, F; Alexander, M; Ali, S; Alkhazov, G; Alvarez Cartelle, P; Alves Jr, A A; Amato, S; Amerio, S; Amhis, Y; Anderlini, L; Anderson, J; Andreassen, R; Appleby, R B; Aquines Gutierrez, O; Archilli, F; Artamonov, A; Artuso, M; Aslanides, E; Auriemma, G; Bachmann, S; Back, J J; Baesso, C; Balagura, V; Baldini, W; Barlow, R J; Barschel, C; Barsuk, S; Barter, W; Bauer, Th; Bay, A; Beddow, J; Bedeschi, F; Bediaga, I; Belogurov, S; Belous, K; Belyaev, I; Ben-Haim, E; Benayoun, M; Bencivenni, G; Benson, S; Benton, J; Berezhnoy, A; Bernet, R; Bettler, M -O; van Beuzekom, M; Bien, A; Bifani, S; Bird, T; Bizzeti, A; Bjørnstad, P M; Blake, T; Blanc, F; Blouw, J; Blusk, S; Bocci, V; Bondar, A; Bondar, N; Bonivento, W; Borghi, S; Borgia, A; Bowcock, T J V; Bowen, E; Bozzi, C; Brambach, T; van den Brand, J; Bressieux, J; Brett, D; Britsch, M; Britton, T; Brook, N H; Brown, H; Burducea, I; Bursche, A; Busetto, G; Buytaert, J; Cadeddu, S; Callot, O; Calvi, M; Calvo Gomez, M; Camboni, A; Campana, P; Carbone, A; Carboni, G; Cardinale, R; Cardini, A; Carranza-Mejia, H; Carson, L; Carvalho Akiba, K; Casse, G; Cattaneo, M; Cauet, Ch; Charles, M; Charpentier, Ph; Chen, P; Chiapolini, N; Chrzaszcz, M; Ciba, K; Cid Vidal, X; Ciezarek, G; Clarke, P E L; Clemencic, M; Cliff, H V; Closier, J; Coca, C; Coco, V; Cogan, J; Cogneras, E; Collins, P; Comerma-Montells, A; Contu, A; Cook, A; Coombes, M; Coquereau, S; Corti, G; Couturier, B; Cowan, G A; Craik, D; Cunliffe, S; Currie, R; D'Ambrosio, C; David, P; David, P N Y; De Bonis, I; De Bruyn, K; De Capua, S; De Cian, M; De Miranda, J M; De Oyanguren Campos, M; De Paula, L; De Silva, W; De Simone, P; Decamp, D; Deckenhoff, M; Del Buono, L; Derkach, D; Deschamps, O; Dettori, F; Di Canto, A; Dijkstra, H; Dogaru, M; Donleavy, S; Dordei, F; Dosil Suárez, A; Dossett, D; Dovbnya, A; Dupertuis, F; Dzhelyadin, R; Dziurda, A; Dzyuba, A; Easo, S; Egede, U; Egorychev, V; Eidelman, S; van Eijk, D; Eisenhardt, S; Eitschberger, U; Ekelhof, R; Eklund, L; El Rifai, I; Elsasser, Ch; Elsby, D; Falabella, A; Färber, C; Fardell, G; Farinelli, C; Farry, S; Fave, V; Ferguson, D; Fernandez Albor, V; Ferreira Rodrigues, F; Ferro-Luzzi, M; Filippov, S; Fitzpatrick, C; Fontana, M; Fontanelli, F; Forty, R; Francisco, O; Frank, M; Frei, C; Frosini, M; Furcas, S; Furfaro, E; Gallas Torreira, A; Galli, D; Gandelman, M; Gandini, P; Gao, Y; Garofoli, J; Garosi, P; Garra Tico, J; Garrido, L; Gaspar, C; Gauld, R; Gersabeck, E; Gersabeck, M; Gershon, T; Ghez, Ph; Gibson, V; Gligorov, V V; Göbel, C; Golubkov, D; Golutvin, A; Gomes, A; Gordon, H; Grabalosa Gándara, M; Graciani Diaz, R; Granado Cardoso, L A; Graugés, E; Graziani, G; Grecu, A; Greening, E; Gregson, S; Grünberg, O; Gui, B; Gushchin, E; Guz, Yu; Gys, T; Hadjivasiliou, C; Haefeli, G; Haen, C; Haines, S C; Hall, S; Hampson, T; Hansmann-Menzemer, S; Harnew, N; Harnew, S T; Harrison, J; Hartmann, T; He, J; Heijne, V; Hennessy, K; Henrard, P; Hernando Morata, J A; van Herwijnen, E; Hicks, E; Hill, D; Hoballah, M; Hombach, C; Hopchev, P; Hulsbergen, W; Hunt, P; Huse, T; Hussain, N; Hutchcroft, D; Hynds, D; Iakovenko, V; Idzik, M; Ilten, P; Jacobsson, R; Jaeger, A; Jans, E; Jaton, P; Jing, F; John, M; Johnson, D; Jones, C R; Jost, B; Kaballo, M; Kandybei, S; Karacson, M; Karbach, T M; Kenyon, I R; Kerzel, U; Ketel, T; Keune, A; Khanji, B; Kochebina, O; Komarov, I; Koopman, R F; Koppenburg, P; Korolev, M; Kozlinskiy, A; Kravchuk, L; Kreplin, K; Kreps, M; Krocker, G; Krokovny, P; Kruse, F; Kucharczyk, M; Kudryavtsev, V; Kvaratskheliya, T; La Thi, V N; Lacarrere, D; Lafferty, G; Lai, A; Lambert, D; Lambert, R W; Lanciotti, E; Lanfranchi, G; Langenbruch, C; Latham, T; Lazzeroni, C; Le Gac, R; van Leerdam, J; Lees, J -P; Lefèvre, R; Leflat, A; Lefrançois, J; Leo, S; Leroy, O; Leverington, B; Li, Y; Li Gioi, L; Liles, M; Lindner, R; Linn, C; Liu, B; Liu, G; von Loeben, J; Lohn, S; Lopes, J H; Lopez Asamar, E; Lopez-March, N; Lu, H; Lucchesi, D; Luisier, J; Luo, H; Machefert, F; Machikhiliyan, I V; Maciuc, F; Maev, O; Malde, S; Manca, G; Mancinelli, G; Marconi, U; Märki, R; Marks, J; Martellotti, G; Martens, A; Martin, L; Martín Sánchez, A; Martinelli, M; Martinez Santos, D; Martins Tostes, D; Massafferri, A; Matev, R; Mathe, Z; Matteuzzi, C; Maurice, E; Mazurov, A; McCarthy, J; McNulty, R; Mcnab, A; Meadows, B; Meier, F; Meissner, M; Merk, M; Milanes, D A; Minard, M -N; Molina Rodriguez, J; Monteil, S; Moran, D; Morawski, P; Morello, M J; Mountain, R; Mous, I; Muheim, F; Müller, K; Muresan, R; Muryn, B; Muster, B; Naik, P; Nakada, T; Nandakumar, R; Nasteva, I; Needham, M; Neufeld, N; Nguyen, A D; Nguyen, T D; Nguyen-Mau, C; Nicol, M; Niess, V; Niet, R; Nikitin, N; Nikodem, T; Nomerotski, A; Novoselov, A; Oblakowska-Mucha, A; Obraztsov, V; Oggero, S; Ogilvy, S; Okhrimenko, O; Oldeman, R; Orlandea, M; Otalora Goicochea, J M; Owen, P; Pal, B K; Palano, A; Palutan, M; Panman, J; Papanestis, A; Pappagallo, M; Parkes, C; Parkinson, C J; Passaleva, G; Patel, G D; Patel, M; Patrick, G N; Patrignani, C; Pavel-Nicorescu, C; Pazos Alvarez, A; Pellegrino, A; Penso, G; Pepe Altarelli, M; Perazzini, S; Perego, D L; Perez Trigo, E; Pérez-Calero Yzquierdo, A; Perret, P; Perrin-Terrin, M; Pessina, G; Petridis, K; Petrolini, A; Phan, A; Picatoste Olloqui, E; Pietrzyk, B; Pilař, T; Pinci, D; Playfer, S; Plo Casasus, M; Polci, F; Polok, G; Poluektov, A; Polycarpo, E; Popov, D; Popovici, B; Potterat, C; Powell, A; Prisciandaro, J; Pugatch, V; Puig Navarro, A; Punzi, G; Qian, W; Rademacker, J H; Rakotomiaramanana, B; Rangel, M S; Raniuk, I; Rauschmayr, N; Raven, G; Redford, S; Reid, M M; dos Reis, A C; Ricciardi, S; Richards, A; Rinnert, K; Rives Molina, V; Roa Romero, D A; Robbe, P; Rodrigues, E; Rodriguez Perez, P; Roiser, S; Romanovsky, V; Romero Vidal, A; Rouvinet, J; Ruf, T; Ruffini, F; Ruiz, H; Ruiz Valls, P; Sabatino, G; Saborido Silva, J J; Sagidova, N; Sail, P; Saitta, B; Salzmann, C; Sanmartin Sedes, B; Sannino, M; Santacesaria, R; Santamarina Rios, C; Santovetti, E; Sapunov, M; Sarti, A; Satriano, C; Satta, A; Savrie, M; Savrina, D; Schaack, P; Schiller, M; Schindler, H; Schlupp, M; Schmelling, M; Schmidt, B; Schneider, O; Schopper, A; Schune, M -H; Schwemmer, R; Sciascia, B; Sciubba, A; Seco, M; Semennikov, A; Senderowska, K; Sepp, I; Serra, N; Serrano, J; Seyfert, P; Shapkin, M; Shapoval, I; Shatalov, P; Shcheglov, Y; Shears, T; Shekhtman, L; Shevchenko, O; Shevchenko, V; Shires, A; Silva Coutinho, R; Skwarnicki, T; Smith, N A; Smith, E; Smith, M; Sokoloff, M D; Soler, F J P; Soomro, F; Souza, D; Souza De Paula, B; Spaan, B; Sparkes, A; Spradlin, P; Stagni, F; Stahl, S; Steinkamp, O; Stoica, S; Stone, S; Storaci, B; Straticiuc, M; Straumann, U; Subbiah, V K; Swientek, S; Syropoulos, V; Szczekowski, M; Szczypka, P; Szumlak, T; T'Jampens, S; Teklishyn, M; Teodorescu, E; Teubert, F; Thomas, C; Thomas, E; van Tilburg, J; Tisserand, V; Tobin, M; Tolk, S; Tonelli, D; Topp-Joergensen, S; Torr, N; Tournefier, E; Tourneur, S; Tran, M T; Tresch, M; Tsaregorodtsev, A; Tsopelas, P; Tuning, N; Ubeda Garcia, M; Ukleja, A; Urner, D; Uwer, U; Vagnoni, V; Valenti, G; Vazquez Gomez, R; Vazquez Regueiro, P; Vecchi, S; Velthuis, J J; Veltri, M; Veneziano, G; Vesterinen, M; Viaud, B; Vieira, D; Vilasis-Cardona, X; Vollhardt, A; Volyanskyy, D; Voong, D; Vorobyev, A; Vorobyev, V; Voß, C; Voss, H; Waldi, R; Wallace, R; Wandernoth, S; Wang, J; Ward, D R; Watson, N K; Webber, A D; Websdale, D; Whitehead, M; Wicht, J; Wiechczynski, J; Wiedner, D; Wiggers, L; Wilkinson, G; Williams, M P; Williams, M; Wilson, F F; Wishahi, J; Witek, M; Wotton, S A; Wright, S; Wu, S; Wyllie, K; Xie, Y; Xing, F; Xing, Z; Yang, Z; Young, R; Yuan, X; Yushchenko, O; Zangoli, M; Zavertyaev, M; Zhang, F; Zhang, L; Zhang, W C; Zhang, Y; Zhelezov, A; Zhokhov, A; Zhong, L; Zvyagin, A

    2013-01-01

    An analysis of $B^{\\pm}\\to DK^{\\pm}$ and $B^{\\pm}\\to D\\pi^{\\pm}$ decays is presented where the $D$ meson is reconstructed in the four-body final state $K^{\\pm}\\pi^{\\mp} \\pi^+ \\pi^-$. Using LHCb data corresponding to an integrated luminosity of $1.0{\\rm \\,fb}^{-1}$, first observations are made of the suppressed ADS modes $B^{\\pm}\\to [\\pi^{\\pm} K^{\\mp}\\pi^+\\pi^-]_D K^{\\pm}$ and $B^{\\pm}\\to [\\pi^{\\pm} K^{\\mp} \\pi^+\\pi^- ]_D\\pi^{\\pm}$ with a significance of $5.1\\sigma$ and greater than $10\\sigma$, respectively. Measurements of $CP$ asymmetries and $CP$-conserving ratios of partial widths from this family of decays are also performed. The magnitude of the ratio between the suppressed and favoured $B^{\\pm}\\to DK^{\\pm}$ amplitudes is determined to be $r^K_B = 0.097 \\pm{0.011}$.

  6. Principal scheme of preventive maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Nishiyama, Takuya; Terano, Takao; Yokoo, Takeshi; Shinohara, Yasushi

    1985-01-01

    It is of great importance to turn lessons learned from abnormal event experiences to advantage as well as taking apriori actions for prevention of abnormal events in nuclear power plants. From this point of view, a consultation system, named as Preventive Maintenance Support System (PMSS), which is to possess accumulated knowledges drawn from the past abnormal events in nuclear power plants infer occurrences, factors and developments of abnormal events and recommend preventive countermeasures on the basis of the knowledges, has been proposed. This report presents the principal scheme of PMSS. To begin with, following to the discussion of the purpose and use of PMSS, the fundamental functions PMSS should perform are specified. They are (1) event factors analyzation, (2) event prediction (event development estimation and analogous event estimation), (3) event significance evaluation and (4) preventive countermeasures presentation. In the next place, it is asserted that such a system should be constructed as a knowledge engineering one. Then, the R and D subjects and related schedule for PMSS are set up. (author)

  7. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  8. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    International Nuclear Information System (INIS)

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  9. Indoor PM1, PM2.5, PM10 and outdoor PM2.5 concentrations in primary schools in Sari, Iran.

    Science.gov (United States)

    Mohammadyan, Mahmoud; Shabankhani, Bijan

    2013-09-01

    This study was carried out to determine the distribution of particles in classrooms in primary schools located in the centre of the city of Sari, Iran and identify the relationship between indoor classroom particle levels and outdoor PM2.5 concentrations. Outdoor PM2.5 and indoor PM1, PM2.5, and PM10 were monitored using a real-time Micro Dust Pro monitor and a GRIMM monitor, respectively. Both monitors were calibrated by gravimetric method using filters. The Kolmogorov-Smirnov test showed that all indoor and outdoor data fitted normal distribution. Mean indoor PM1, PM2.5, PM10 and outdoor PM2.5 concentrations for all of the classrooms were 17.6 μg m(-3), 46.6 μg m(-3), 400.9 μg m(-3), and 36.9 μg m(-3), respectively. The highest levels of indoor and outdoor PM2.5 concentrations were measured at the Shahed Boys School (69.1 μg m(-3) and 115.8 μg m(-3), respectively). The Kazemi school had the lowest levels of indoor and outdoor PM2.5 (29.1 μg m(-3) and 15.5 μg m(-3), respectively). In schools located near both main and small roads, the association between indoor fine particle (PM2.5 and PM1) and outdoor PM2.5 levels was stronger than that between indoor PM10 and outdoor PM2.5 levels. Mean indoor PM2.5 and PM10 and outdoor PM2.5 were higher than the standards for PM2.5 and PM10, and there was a good correlation between indoor and outdoor fine particle concentrations.

  10. Associations of daily levels of PM10 and NO₂ with emergency hospital admissions and mortality in Switzerland: Trends and missed prevention potential over the last decade.

    Science.gov (United States)

    Perez, Laura; Grize, Leticia; Infanger, Denis; Künzli, Nino; Sommer, Hansjörg; Alt, Gian-Marco; Schindler, Christian

    2015-07-01

    In most regions of the world, levels and constituents of the air pollution mixture have substantially changed over the last decades. To evaluate if the effects of PM10 and NO2 on daily emergency hospital admissions and mortality have changed during a ~10 year period in Switzerland; to retrospectively estimate prevention potential of different policy choices. Thirteen Poisson-regression models across Switzerland were developed using daily PM10 and NO2 levels from central monitors and accounting for several temporal and seasonal confounders. Time trends of effects were evaluated with an interaction variable. Distributed lag models with 28 days exposure window were used to retrospectively predict missed prevention potential for each region. Overall, emergency hospitalizations and mortality from any medical cause increased by 0.2% (95% Confidence Interval [95% CI]: 0.01, 0.33) and 0.2% (95% CI: -0.1, 0.6) for a 10 µg/m(3) increment of PM10, and 0.7% (95% CI: 0.1, 1.3) for NO2 and mortality. Over the study period, the association between respiratory emergencies and PM10 changed by a factor of 1.017 (95% CI: 1.001, 1.034) and by a factor of 0.977 [95% CI: 0.956, 0.998]) for respiratory mortality among the elderly for NO2. During the study period, abatement strategies targeting a 20% lower overall mean would have prevented four times more cases than abating days exceeding daily standards. During the last decade, the short term effects of PM10 and NO2 on hospitalizations and mortality in Switzerland have almost not changed. More ambitious strategies of air pollutant reduction in Switzerland would have had non negligible public health benefits. Copyright © 2015 Elsevier Inc. All rights reserved.

  11. Air Pollution Quality Index (AQI and Density of PM1, PM2.5 and PM10 in the Air of Qom

    Directory of Open Access Journals (Sweden)

    M Azizifar

    2012-05-01

    Full Text Available

    Background and Objectives: Air pollution has broad social, economical, political and technical aspects. one of the major issues in this regard is taking measures to prevent its increase. Since suspended particles are among the standard pollutants, the present study was carried out with the aim of measuring the amounts of these particles.

     

    Methods: In the present study, the suspended particles ( PM1, PM2.5 and PM10 were measured at two sites in Qom city. For each of them, 60 samples were selected with the Enviro Check during five consecutive months during summer (2 months and fall.

     

    Results: During sampling, PM10 in the period between October 22'th to November 22nd 2007 had the maximum amount with the mean of 117µg/m3 and in the period between September 22'th to October 22nd 2007 it had the minimum amount with the mean of 83µg/m3. PM2.5 in the period between November 22nd to December 22nd 2007 with the mean of 33µg/m3 had the maximum amount and in the period  between July 22nd to October 22nd 2007 it had the minimum amount with the mean of 8µg/m3.

     

    Conclusion: Based on the findings of this study, the densities of suspended particles PM1, PM2.5 and PM10 were below the standard levels on most occasions. The amounts of AQI for them were normal and acceptable.

  12. Preserved intention maintenance and impaired execution of prospective memory responses in schizophrenia: evidence from an event-based prospective memory study

    Directory of Open Access Journals (Sweden)

    Gyula eDemeter

    2016-04-01

    Full Text Available Executive system dysfunction and impaired prospective memory (PM are widely documented in schizophrenia. However, it is not yet clarified which components of PM function are impaired in this disorder. Two plausible target components are the maintenance of delayed intentions and the execution of PM responses. Furthermore, it is debated whether the impaired performance on frequently used executive tasks is associated with deficit in PM functions. The aim of our study was twofold. First, we aimed to investigate the specific processes involved in event-based PM function, mainly focusing on difference between maintenance of intention and execution of PM responses. Second, we aimed to unfold the possible connections between executive functions, clinical symptoms, and PM performance. An event-based PM paradigm was applied with three main conditions: baseline (with no expectation of PM stimuli, and without PM stimuli, expectation condition (participants were told that PM stimuli might occur, though none actually did, and execution condition (participants were told that PM stimuli might occur, and PM stimuli did occur. This procedure allowed us to separately investigate performances associated with intention maintenance and execution of PM responses. We assessed working memory and set-shifting executive functions by memory span tasks and by the Wisconsin Card Sorting Test (WCST, respectively. Twenty patients diagnosed with schizophrenia and 20 healthy control subjects (matched according to age and education took part in the study. It was hypothesized that patients would manifest different levels of performance in the expectation and execution conditions of the PM task. Our results confirmed that the difference between baseline performance and performance in the execution condition (execution cost was significantly larger for participants diagnosed with schizophrenia in comparison with matched healthy control group. However, this difference was not

  13. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K. [VTT Industrial Systems, Espoo (Finland)

    2006-12-15

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  14. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Laakso, K.

    2006-12-01

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  15. Maintenance Staffing Standards for Zero-Based Budgeting.

    Science.gov (United States)

    Adams, Matthew C.; And Others

    1998-01-01

    Discusses school preventive maintenance and the variables associated with maintenance staffing standards that address a zero-based budgeting environment. Explores preventive-maintenance measurement for staffing requirements, defines staffing levels and job descriptions, and outlines the factors to consider when creating a maintenance program and…

  16. 浅谈医疗设备管理中的预防性维护%On advantages and disadvantages of preventive maintenance for medical equipments

    Institute of Scientific and Technical Information of China (English)

    张宜江; 焦明阳

    2012-01-01

    目的:医疗设备是医院现代化建设的物质基础,加强医疗设备管理,使医疗设备预防性维护(PM)成为医院现代化管理的一项重要措施.方法:在医院建设中,人才是基础,医疗器械是条件,管理是关键.加强医疗设备管理是医院重点工作之一,在医疗设备管理中维修与保养则是重中之重.结果:做好医疗设备的维护保养对延长仪器寿命、提高诊断准确率起到重要作用.结论:预防性维护是指周期性地对仪器进行一系列科学的维护工作,以确保仪器安全地处于最佳工作状态.%Objective: Hospital medical equipment is the material basis of hospital modernization, and also an important symbol of the modernization. Methods: In hospital construction, talent is the foundation, medical equipment is the condition, management is the key. Strengthen the management of medical equipment is a focal point of the work of the hospital. In the management of medical equipment, repair and maintenance is very important. Results: The maintenance plays an important role in extending equipment life and improving the accuracy of diagnosis. Conclusion: Preventive maintenance is a series of scientific maintenance work for equipments, to ensure that the apparatus securely in the best working condition. This series of maintenance work mainly includes the operating performance test and adjustment, electrical safety testing, cleaning, lubricating, and replacing consumable components.

  17. An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart

    International Nuclear Information System (INIS)

    Panagiotidou, Sofia; Nenes, George

    2009-01-01

    This paper proposes a model for the economic design of a variable-parameter (Vp) Shewhart control chart used to monitor the mean in a process, where, apart from quality shifts, failures may also occur. Quality shifts result in poorer quality outcome, higher operational cost and higher failure rate. Thus, removal of such quality shifts, besides improving the quality of the outcome and reducing the quality cost, is also a preventive maintenance (PM) action since it reduces the probability of a failure and improves the equipment reliability. The proposed model allows the determination of the scheme parameters that minimize the total expected quality and maintenance cost of the procedure. The monitoring mechanism of the process employs an adaptive Vp-Shewhart control chart. To evaluate the effectiveness of the proposed model, its optimal expected cost is compared against the optimum cost of a fixed-parameter (Fp) chart

  18. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    Directory of Open Access Journals (Sweden)

    Mihai Florian

    2015-09-01

    Full Text Available Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair and replacement activities as well as large revenue losses, mainly in the case of offshore wind farms. The recent development and evolution of condition monitoring techniques, as well as the fact that an increasing number of installed turbines are equipped with online monitoring systems, offers a large amount of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law approach. The model is used within a risk-based maintenance decision framework to optimize maintenance planning for the blades lifetime.

  19. Preventative maintenance of drainpipes in radioisotope facility using flexible hose

    International Nuclear Information System (INIS)

    Hiroi, Tomoko; Tatsunami, Shinobu; Kuwabara, Rie; Kouyama, Hiroshi; Matsui, Hiroaki; Yamamoto, Takio

    2009-01-01

    A flexible hose made of plasticized polyvinyl chloride was introduced into underground radioactive wastewater drainpipes as preventative maintenance. We completed a seamless connection spanning the longest interval between the last confluence point and the wastewater tank. Although the flexible hose is not a construction material but rather a consumable article, it is robust against the effects of temperature change and erosion by chemical substances. Moreover, it is placed in an underground steel pipe where it is protected from UV irradiation and friction. Therefore, increased hose durability is expected. In addition, the risk of damage from earthquakes or ground subsidence is negligible due to the flexibility of the hose. Compared with a full renovation of the plumbing, the economic cost is much cheaper and the construction period is much shorter. We propose the use of flexible hoses as one of the most convenient methods to prevent leakage accidents at radioisotope facilities with underground plumbing for wastewater. (author)

  20. Preventive maintenance plan of the air-conditioning duct using the ACM-sensor

    International Nuclear Information System (INIS)

    Fukuba, Kazushi; Ito, Takanobu; Kojima, Akiko; Tanji, Kazuhiro; Sato, Yuki

    2013-01-01

    Air-conditioning duct is difficult to predict the date to occur of corrosion such as affect the function. Therefore, the current conservation method is mostly corrective maintenance. Therefore, we used the test pieces of six types and ACM-sensor in order to solve the corrosion speed from corrosion environment and relationship of corrosion quantity of test pieces. In addition, was used the duct molded articles various in order to check the corrosion degree of when processed the duct. As a result, we were selected crust body constituting a duct and optimal combination of the flange by solve the corrosion speed of the test pieces various. Thus, it performs preventive disposal before to occur of corrosion such as affect the function by predicting the duct life from corrosion speed, and lead to stability and safe operating by appropriate maintenance of equipment. (author)

  1. Wind turbine blade life-time assessment model for preventive planning of operation and maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2014-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...... of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O......&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law...

  2. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...... of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O......&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law...

  3. Measurement of the charge asymmetry in $B^{\\pm}\\rightarrow \\phi K^{\\pm}$ and search for $B^{\\pm}\\rightarrow \\phi \\pi^{\\pm}$ decays

    CERN Document Server

    Aaij, R; Adinolfi, M; Adrover, C; Affolder, A; Ajaltouni, Z; Albrecht, J; Alessio, F; Alexander, M; Ali, S; Alkhazov, G; Alvarez Cartelle, P; Alves Jr, A A; Amato, S; Amerio, S; Amhis, Y; Anderlini, L; Anderson, J; Andreassen, R; Andrews, J E; Appleby, R B; Aquines Gutierrez, O; Archilli, F; Artamonov, A; Artuso, M; Aslanides, E; Auriemma, G; Baalouch, M; Bachmann, S; Back, J J; Badalov, A; Baesso, C; Balagura, V; Baldini, W; Barlow, R J; Barschel, C; Barsuk, S; Barter, W; Bauer, Th; Bay, A; Beddow, J; Bedeschi, F; Bediaga, I; Belogurov, S; Belous, K; Belyaev, I; Ben-Haim, E; Bencivenni, G; Benson, S; Benton, J; Berezhnoy, A; Bernet, R; Bettler, M -O; van Beuzekom, M; Bien, A; Bifani, S; Bird, T; Bizzeti, A; Bjørnstad, P M; Blake, T; Blanc, F; Blouw, J; Blusk, S; Bocci, V; Bondar, A; Bondar, N; Bonivento, W; Borghi, S; Borgia, A; Bowcock, T J V; Bowen, E; Bozzi, C; Brambach, T; van den Brand, J; Bressieux, J; Brett, D; Britsch, M; Britton, T; Brook, N H; Brown, H; Bursche, A; Busetto, G; Buytaert, J; Cadeddu, S; Callot, O; Calvi, M; Calvo Gomez, M; Camboni, A; Campana, P; Campora Perez, D; Carbone, A; Carboni, G; Cardinale, R; Cardini, A; Carranza-Mejia, H; Carson, L; Carvalho Akiba, K; Casse, G; Castillo Garcia, L; Cattaneo, M; Cauet, Ch; Cenci, R; Charles, M; Charpentier, Ph; Chen, P; Cheung, S -F; Chiapolini, N; Chrzaszcz, M; Ciba, K; Cid Vidal, X; Ciezarek, G; Clarke, P E L; Clemencic, M; Cliff, H V; Closier, J; Coca, C; Coco, V; Cogan, J; Cogneras, E; Collins, P; Comerma-Montells, A; Contu, A; Cook, A; Coombes, M; Coquereau, S; Corti, G; Couturier, B; Cowan, G A; Craik, D C; Cruz Torres, M; Cunliffe, S; Currie, R; D'Ambrosio, C; David, P; David, P N Y; Davis, A; De Bonis, I; De Bruyn, K; De Capua, S; De Cian, M; De Miranda, J M; De Paula, L; De Silva, W; De Simone, P; Decamp, D; Deckenhoff, M; Del Buono, L; Déléage, N; Derkach, D; Deschamps, O; Dettori, F; Di Canto, A; Dijkstra, H; Dogaru, M; Donleavy, S; Dordei, F; Dosil Suárez, A; Dossett, D; Dovbnya, A; Dupertuis, F; Durante, P; Dzhelyadin, R; Dziurda, A; Dzyuba, A; Easo, S; Egede, U; Egorychev, V; Eidelman, S; van Eijk, D; Eisenhardt, S; Eitschberger, U; Ekelhof, R; Eklund, L; El Rifai, I; Elsasser, Ch; Falabella, A; Färber, C; Farinelli, C; Farry, S; Ferguson, D; Fernandez Albor, V; Ferreira Rodrigues, F; Ferro-Luzzi, M; Filippov, S; Fiore, M; Fitzpatrick, C; Fontana, M; Fontanelli, F; Forty, R; Francisco, O; Frank, M; Frei, C; Frosini, M; Furfaro, E; Gallas Torreira, A; Galli, D; Gandelman, M; Gandini, P; Gao, Y; Garofoli, J; Garosi, P; Garra Tico, J; Garrido, L; Gaspar, C; Gauld, R; Gersabeck, E; Gersabeck, M; Gershon, T; Ghez, Ph; Gibson, V; Giubega, L; Gligorov, V V; Göbel, C; Golubkov, D; Golutvin, A; Gomes, A; Gorbounov, P; Gordon, H; Grabalosa Gándara, M; Graciani Diaz, R; Granado Cardoso, L A; Graugés, E; Graziani, G; Grecu, A; Greening, E; Gregson, S; Griffith, P; Grünberg, O; Gui, B; Gushchin, E; Guz, Yu; Gys, T; Hadjivasiliou, C; Haefeli, G; Haen, C; Haines, S C; Hall, S; Hamilton, B; Hampson, T; Hansmann-Menzemer, S; Harnew, N; Harnew, S T; Harrison, J; Hartmann, T; He, J; Head, T; Heijne, V; Hennessy, K; Henrard, P; Hernando Morata, J A; van Herwijnen, E; Heß, M; Hicheur, A; Hicks, E; Hill, D; Hoballah, M; Hombach, C; Hulsbergen, W; Hunt, P; Huse, T; Hussain, N; Hutchcroft, D; Hynds, D; Iakovenko, V; Idzik, M; Ilten, P; Jacobsson, R; Jaeger, A; Jans, E; Jaton, P; Jawahery, A; Jing, F; John, M; Johnson, D; Jones, C R; Joram, C; Jost, B; Kaballo, M; Kandybei, S; Kanso, W; Karacson, M; Karbach, T M; Kenyon, I R; Ketel, T; Khanji, B; Kochebina, O; Komarov, I; Koopman, R F; Koppenburg, P; Korolev, M; Kozlinskiy, A; Kravchuk, L; Kreplin, K; Kreps, M; Krocker, G; Krokovny, P; Kruse, F; Kucharczyk, M; Kudryavtsev, V; Kurek, K; Kvaratskheliya, T; La Thi, V N; Lacarrere, D; Lafferty, G; Lai, A; Lambert, D; Lambert, R W; Lanciotti, E; Lanfranchi, G; Langenbruch, C; Latham, T; Lazzeroni, C; Le Gac, R; van Leerdam, J; Lees, J -P; Lefèvre, R; Leflat, A; Lefrançois, J; Leo, S; Leroy, O; Lesiak, T; Leverington, B; Li, Y; Li Gioi, L; Liles, M; Lindner, R; Linn, C; Liu, B; Liu, G; Lohn, S; Longstaff, I; Lopes, J H; Lopez-March, N; Lu, H; Lucchesi, D; Luisier, J; Luo, H; Lupton, O; Machefert, F; Machikhiliyan, I V; Maciuc, F; Maev, O; Malde, S; Manca, G; Mancinelli, G; Maratas, J; Marconi, U; Marino, P; Märki, R; Marks, J; Martellotti, G; Martens, A; Martín Sánchez, A; Martinelli, M; Martinez Santos, D; Martins Tostes, D; Martynov, A; Massafferri, A; Matev, R; Mathe, Z; Matteuzzi, C; Maurice, E; Mazurov, A; McCarthy, J; McNab, A; McNulty, R; McSkelly, B; Meadows, B; Meier, F; Meissner, M; Merk, M; Milanes, D A; Minard, M -N; Molina Rodriguez, J; Monteil, S; Moran, D; Morawski, P; Mordà, A; Morello, M J; Mountain, R; Mous, I; Muheim, F; Müller, K; Muresan, R; Muryn, B; Muster, B; Naik, P; Nakada, T; Nandakumar, R; Nasteva, I; Needham, M; Neubert, S; Neufeld, N; Nguyen, A D; Nguyen, T D; Nguyen-Mau, C; Nicol, M; Niess, V; Niet, R; Nikitin, N; Nikodem, T; Nomerotski, A; Novoselov, A; Oblakowska-Mucha, A; Obraztsov, V; Oggero, S; Ogilvy, S; Okhrimenko, O; Oldeman, R; Orlandea, M; Otalora Goicochea, J M; Owen, P; Oyanguren, A; Pal, B K; Palano, A; Palutan, M; Panman, J; Papanestis, A; Pappagallo, M; Parkes, C; Parkinson, C J; Passaleva, G; Patel, G D; Patel, M; Patrick, G N; Patrignani, C; Pavel-Nicorescu, C; Pazos Alvarez, A; Pearce, A; Pellegrino, A; Penso, G; Pepe Altarelli, M; Perazzini, S; Perez Trigo, E; Pérez-Calero Yzquierdo, A; Perret, P; Perrin-Terrin, M; Pescatore, L; Pesen, E; Pessina, G; Petridis, K; Petrolini, A; Phan, A; Picatoste Olloqui, E; Pietrzyk, B; Pilař, T; Pinci, D; Playfer, S; Plo Casasus, M; Polci, F; Polok, G; Poluektov, A; Polycarpo, E; Popov, A; Popov, D; Popovici, B; Potterat, C; Powell, A; Prisciandaro, J; Pritchard, A; Prouve, C; Pugatch, V; Puig Navarro, A; Punzi, G; Qian, W; Rachwal, B; Rademacker, J H; Rakotomiaramanana, B; Rangel, M S; Raniuk, I; Rauschmayr, N; Raven, G; Redford, S; Reichert, S; Reid, M M; dos Reis, A C; Ricciardi, S; Richards, A; Rinnert, K; Rives Molina, V; Roa Romero, D A; Robbe, P; Roberts, D A; Rodrigues, A B; Rodrigues, E; Rodriguez Perez, P; Roiser, S; Romanovsky, V; Romero Vidal, A; Rouvinet, J; Ruf, T; Ruffini, F; Ruiz, H; Ruiz Valls, P; Sabatino, G; Saborido Silva, J J; Sagidova, N; Sail, P; Saitta, B; Salustino Guimaraes, V; Sanmartin Sedes, B; Santacesaria, R; Santamarina Rios, C; Santovetti, E; Sapunov, M; Sarti, A; Satriano, C; Satta, A; Savrie, M; Savrina, D; Schiller, M; Schindler, H; Schlupp, M; Schmelling, M; Schmidt, B; Schneider, O; Schopper, A; Schune, M -H; Schwemmer, R; Sciascia, B; Sciubba, A; Seco, M; Semennikov, A; Senderowska, K; Sepp, I; Serra, N; Serrano, J; Seyfert, P; Shapkin, M; Shapoval, I; Shcheglov, Y; Shears, T; Shekhtman, L; Shevchenko, O; Shevchenko, V; Shires, A; Silva Coutinho, R; Sirendi, M; Skidmore, N; Skwarnicki, T; Smith, N A; Smith, E; Smith, E; Smith, J; Smith, M; Sokoloff, M D; Soler, F J P; Soomro, F; Souza, D; Souza De Paula, B; Spaan, B; Sparkes, A; Spradlin, P; Stagni, F; Stahl, S; Steinkamp, O; Stevenson, S; Stoica, S; Stone, S; Storaci, B; Straticiuc, M; Straumann, U; Subbiah, V K; Sun, L; Sutcliffe, W; Swientek, S; Syropoulos, V; Szczekowski, M; Szczypka, P; Szilard, D; Szumlak, T; T'Jampens, S; Teklishyn, M; Teodorescu, E; Teubert, F; Thomas, C; Thomas, E; van Tilburg, J; Tisserand, V; Tobin, M; Tolk, S; Tonelli, D; Topp-Joergensen, S; Torr, N; Tournefier, E; Tourneur, S; Tran, M T; Tresch, M; Tsaregorodtsev, A; Tsopelas, P; Tuning, N; Ubeda Garcia, M; Ukleja, A; Ustyuzhanin, A; Uwer, U; Vagnoni, V; Valenti, G; Vallier, A; Vazquez Gomez, R; Vazquez Regueiro, P; Vázquez Sierra, C; Vecchi, S; Velthuis, J J; Veltri, M; Veneziano, G; Vesterinen, M; Viaud, B; Vieira, D; Vilasis-Cardona, X; Vollhardt, A; Volyanskyy, D; Voong, D; Vorobyev, A; Vorobyev, V; Voß, C; Voss, H; Waldi, R; Wallace, C; Wallace, R; Wandernoth, S; Wang, J; Ward, D R; Watson, N K; Webber, A D; Websdale, D; Whitehead, M; Wicht, J; Wiechczynski, J; Wiedner, D; Wiggers, L; Wilkinson, G; Williams, M P; Williams, M; Wilson, F F; Wimberley, J; Wishahi, J; Wislicki, W; Witek, M; Wormser, G; Wotton, S A; Wright, S; Wu, S; Wyllie, K; Xie, Y; Xing, Z; Yang, Z; Yuan, X; Yushchenko, O; Zangoli, M; Zavertyaev, M; Zhang, F; Zhang, L; Zhang, W C; Zhang, Y; Zhelezov, A; Zhokhov, A; Zhong, L; Zvyagin, A

    2014-01-01

    The CP-violating charge asymmetry in $B^{\\pm}\\rightarrow \\phi K^{\\pm}$ decays is measured in a sample of $pp$ collisions at 7 TeV centre-of-mass energy, corresponding to an integrated luminosity of 1.0 fb$^{-1}$ collected by the LHCb experiment. The result is $\\mathcal{A}_{CP}(B^{\\pm}\\rightarrow \\phi K^{\\pm}) = \\rm 0.022\\pm 0.021 \\pm 0.009$, where the first uncertainty is statistical and the second systematic. In addition, a search for the $B^{\\pm}\\rightarrow \\phi \\pi^{\\pm}$ decay mode is performed, using the $B^{\\pm}\\rightarrow \\phi K^{\\pm}$ decay rate for normalization. An upper limit on the branching fraction $\\mathcal{B}(B^{\\pm}\\rightarrow \\phi \\pi^{\\pm})< 1.5\\times 10^{-7}$ is set at 90% confidence level.

  4. Search for $CP$ violation in $D^{\\pm}\\rightarrow K^0_S K^{\\pm}$ and $D^{\\pm}_{s}\\rightarrow K^0_S \\pi^{\\pm}$ decays

    CERN Document Server

    Aaij, R.; Adinolfi, M.; Affolder, A.; Ajaltouni, Z.; Akar, S.; Albrecht, J.; Alessio, F.; Alexander, M.; Ali, S.; Alkhazov, G.; Alvarez Cartelle, P.; Alves Jr, A.A.; Amato, S.; Amerio, S.; Amhis, Y.; An, L.; Anderlini, L.; Anderson, J.; Andreassen, R.; Andreotti, M.; Andrews, J.E.; Appleby, R.B.; Aquines Gutierrez, O.; Archilli, F.; Artamonov, A.; Artuso, M.; Aslanides, E.; Auriemma, G.; Baalouch, M.; Bachmann, S.; Back, J.J.; Badalov, A.; Balagura, V.; Baldini, W.; Barlow, R.J.; Barschel, C.; Barsuk, S.; Barter, W.; Batozskaya, V.; Battista, V.; Bay, A.; Beaucourt, L.; Beddow, J.; Bedeschi, F.; Bediaga, I.; Belogurov, S.; Belous, K.; Belyaev, I.; Ben-Haim, E.; Bencivenni, G.; Benson, S.; Benton, J.; Berezhnoy, A.; Bernet, R.; Bettler, M.O.; van Beuzekom, M.; Bien, A.; Bifani, S.; Bird, T.; Bizzeti, A.; Bjornstad, P.M.; Blake, T.; Blanc, F.; Blouw, J.; Blusk, S.; Bocci, V.; Bondar, A.; Bondar, N.; Bonivento, W.; Borghi, S.; Borgia, A.; Borsato, M.; Bowcock, T.J.V.; Bowen, E.; Bozzi, C.; Brambach, T.; van den Brand, J.; Bressieux, J.; Brett, D.; Britsch, M.; Britton, T.; Brodzicka, J.; Brook, N.H.; Brown, H.; Bursche, A.; Busetto, G.; Buytaert, J.; Cadeddu, S.; Calabrese, R.; Calvi, M.; Calvo Gomez, M.; Camboni, A.; Campana, P.; Campora Perez, D.; Carbone, A.; Carboni, G.; Cardinale, R.; Cardini, A.; Carranza-Mejia, H.; Carson, L.; Carvalho Akiba, K.; Casse, G.; Cassina, L.; Garcia, L.Castillo; Cattaneo, M.; Cauet, Ch.; Cenci, R.; Charles, M.; Charpentier, Ph.; Chen, S.; Cheung, S.F.; Chiapolini, N.; Chrzaszcz, M.; Ciba, K.; Cid Vidal, X.; Ciezarek, G.; Clarke, P.E.L.; Clemencic, M.; Cliff, H.V.; Closier, J.; Coco, V.; Cogan, J.; Cogneras, E.; Collins, P.; Comerma-Montells, A.; Contu, A.; Cook, A.; Coombes, M.; Coquereau, S.; Corti, G.; Corvo, M.; Counts, I.; Couturier, B.; Cowan, G.A.; Craik, D.C.; Cruz Torres, M.; Cunliffe, S.; Currie, R.; D'Ambrosio, C.; Dalseno, J.; David, P.; David, P.N.Y.; Davis, A.; De Bruyn, K.; De Capua, S.; De Cian, M.; de Miranda, J.M.; De Paula, L.; De Silva, W.; De Simone, P.; Decamp, D.; Deckenhoff, M.; Del Buono, L.; Deleage, N.; Derkach, D.; Deschamps, O.; Dettori, F.; Di Canto, A.; Dijkstra, H.; Donleavy, S.; Dordei, F.; Dorigo, M.; Dosil Suarez, A.; Dossett, D.; Dovbnya, A.; Dreimanis, K.; Dujany, G.; Dupertuis, F.; Durante, P.; Dzhelyadin, R.; Dziurda, A.; Dzyuba, A.; Easo, S.; Egede, U.; Egorychev, V.; Eidelman, S.; Eisenhardt, S.; Eitschberger, U.; Ekelhof, R.; Eklund, L.; El Rifai, I.; Elsasser, Ch.; Ely, S.; Esen, S.; Evans, T.; Falabella, A.; Farber, C.; Farinelli, C.; Farley, N.; Farry, S.; Fay, RF.; Ferguson, D.; Fernandez Albor, V.; Ferreira Rodrigues, F.; Ferro-Luzzi, M.; Filippov, S.; Fiore, M.; Fiorini, M.; Firlej, M.; Fitzpatrick, C.; Fiutowski, T.; Fontana, M.; Fontanelli, F.; Forty, R.; Francisco, O.; Frank, M.; Frei, C.; Frosini, M.; Fu, J.; Furfaro, E.; Gallas Torreira, A.; Galli, D.; Gallorini, S.; Gambetta, S.; Gandelman, M.; Gandini, P.; Gao, Y.; Garofoli, J.; Garra Tico, J.; Garrido, L.; Gaspar, C.; Gauld, R.; Gavardi, L.; Gavrilov, G.; Gersabeck, E.; Gersabeck, M.; Gershon, T.; Ghez, Ph.; Gianelle, A.; Giani', S.; Gibson, V.; Giubega, L.; Gligorov, V.V.; Gobel, C.; Golubkov, D.; Golutvin, A.; Gomes, A.; Gordon, H.; Gotti, C.; Grabalosa Gandara, M.; Graciani Diaz, R.; Granado Cardoso, L.A.; Grauges, E.; Graziani, G.; Grecu, A.; Greening, E.; Gregson, S.; Griffith, P.; Grillo, L.; Grunberg, O.; Gui, B.; Gushchin, E.; Guz, Yu.; Gys, T.; Hadjivasiliou, C.; Haefeli, G.; Haen, C.; Haines, S.C.; Hall, S.; Hamilton, B.; Hampson, T.; Han, X.; Hansmann-Menzemer, S.; Harnew, N.; Harnew, S.T.; Harrison, J.; Hartmann, T.; He, J.; Head, T.; Heijne, V.; Hennessy, K.; Henrard, P.; Henry, L.; Hernando Morata, J.A.; van Herwijnen, E.; Hess, M.; Hicheur, A.; Hill, D.; Hoballah, M.; Hombach, C.; Hulsbergen, W.; Hunt, P.; Hussain, N.; Hutchcroft, D.; Hynds, D.; Idzik, M.; Ilten, P.; Jacobsson, R.; Jaeger, A.; Jalocha, J.; Jans, E.; Jaton, P.; Jawahery, A.; Jing, F.; John, M.; Johnson, D.; Jones, C.R.; Joram, C.; Jost, B.; Jurik, N.; Kaballo, M.; Kandybei, S.; Kanso, W.; Karacson, M.; Karbach, T.M.; Karodia, S.; Kelsey, M.; Kenyon, I.R.; Ketel, T.; Khanji, B.; Khurewathanakul, C.; Klaver, S.; Kochebina, O.; Kolpin, M.; Komarov, I.; Koopman, R.F.; Koppenburg, P.; Korolev, M.; Kozlinskiy, A.; Kravchuk, L.; Kreplin, K.; Kreps, M.; Krocker, G.; Krokovny, P.; Kruse, F.; Kucewicz, W.; Kucharczyk, M.; Kudryavtsev, V.; Kurek, K.; Kvaratskheliya, T.; La Thi, V.N.; Lacarrere, D.; Lafferty, G.; Lai, A.; Lambert, D.; Lambert, R.W.; Lanciotti, E.; Lanfranchi, G.; Langenbruch, C.; Langhans, B.; Latham, T.; Lazzeroni, C.; Le Gac, R.; van Leerdam, J.; Lees, J.P.; Lefevre, R.; Leflat, A.; Lefrancois, J.; Leo, S.; Leroy, O.; Lesiak, T.; Leverington, B.; Li, Y.; Liles, M.; Lindner, R.; Linn, C.; Lionetto, F.; Liu, B.; Liu, G.; Lohn, S.; Longstaff, I.; Lopes, J.H.; Lopez-March, N.; Lowdon, P.; Lu, H.; Lucchesi, D.; Luo, H.; Lupato, A.; Luppi, E.; Lupton, O.; Machefert, F.; Machikhiliyan, I.V.; Maciuc, F.; Maev, O.; Malde, S.; Manca, G.; Mancinelli, G.; Maratas, J.; Marchand, J.F.; Marconi, U.; Benito, C.Marin; Marino, P.; Marki, R.; Marks, J.; Martellotti, G.; Martens, A.; Martin Sanchez, A.; Martinelli, M.; Martinez Santos, D.; Martinez Vidal, F.; Martins Tostes, D.; Massafferri, A.; Matev, R.; Mathe, Z.; Matteuzzi, C.; Mazurov, A.; McCann, M.; McCarthy, J.; McNab, A.; McNulty, R.; McSkelly, B.; Meadows, B.; Meier, F.; Meissner, M.; Merk, M.; Milanes, D.A.; Minard, M.N.; Moggi, N.; Molina Rodriguez, J.; Monteil, S.; Morandin, M.; Morawski, P.; Morda, A.; Morello, M.J.; Moron, J.; Morris, A.B.; Mountain, R.; Muheim, F.; Muller, K.; Muresan, R.; Mussini, M.; Muster, B.; Naik, P.; Nakada, T.; Nandakumar, R.; Nasteva, I.; Needham, M.; Neri, N.; Neubert, S.; Neufeld, N.; Neuner, M.; Nguyen, A.D.; Nguyen, T.D.; Nguyen-Mau, C.; Nicol, M.; Niess, V.; Niet, R.; Nikitin, N.; Nikodem, T.; Novoselov, A.; O'Hanlon, D.P.; Oblakowska-Mucha, A.; Obraztsov, V.; Oggero, S.; Ogilvy, S.; Okhrimenko, O.; Oldeman, R.; Onderwater, G.; Orlandea, M.; Otalora Goicochea, J.M.; Owen, P.; Oyanguren, A.; Pal, B.K.; Palano, A.; Palombo, F.; Palutan, M.; Panman, J.; Papanestis, A.; Pappagallo, M.; Parkes, C.; Parkinson, C.J.; Passaleva, G.; Patel, G.D.; Patel, M.; Patrignani, C.; Pazos Alvarez, A.; Pearce, A.; Pellegrino, A.; Pepe Altarelli, M.; Perazzini, S.; Perez Trigo, E.; Perret, P.; Perrin-Terrin, M.; Pescatore, L.; Pesen, E.; Petridis, K.; Petrolini, A.; Picatoste Olloqui, E.; Pietrzyk, B.; Pilar, T.; Pinci, D.; Pistone, A.; Playfer, S.; Plo Casasus, M.; Polci, F.; Poluektov, A.; Polycarpo, E.; Popov, A.; Popov, D.; Popovici, B.; Potterat, C.; Prisciandaro, J.; Pritchard, A.; Prouve, C.; Pugatch, V.; Puig Navarro, A.; Punzi, G.; Qian, W.; Rachwal, B.; Rademacker, J.H.; Rakotomiaramanana, B.; Rama, M.; Rangel, M.S.; Raniuk, I.; Rauschmayr, N.; Raven, G.; Reichert, S.; Reid, M.M.; dos Reis, A.C.; Ricciardi, S.; Richards, A.; Rihl, M.; Rinnert, K.; Rives Molina, V.; Roa Romero, D.A.; Robbe, P.; Rodrigues, A.B.; Rodrigues, E.; Rodriguez Perez, P.; Roiser, S.; Romanovsky, V.; Vidal, A.Romero; Rotondo, M.; Rouvinet, J.; Ruf, T.; Ruffini, F.; Ruiz, H.; Valls, P.Ruiz; Sabatino, G.; Saborido Silva, J.J.; Sagidova, N.; Sail, P.; Saitta, B.; Salustino Guimaraes, V.; Sanchez Mayordomo, C.; Sanmartin Sedes, B.; Santacesaria, R.; Santamarina Rios, C.; Santovetti, E.; Sapunov, M.; Sarti, A.; Satriano, C.; Satta, A.; Savrie, M.; Savrina, D.; Schiller, M.; Schindler, H.; Schlupp, M.; Schmelling, M.; Schmidt, B.; Schneider, O.; Schopper, A.; Schune, M.H.; Schwemmer, R.; Sciascia, B.; Sciubba, A.; Seco, M.; Semennikov, A.; Sepp, I.; Serra, N.; Serrano, J.; Sestini, L.; Seyfert, P.; Shapkin, M.; Shapoval, I.; Shcheglov, Y.; Shears, T.; Shekhtman, L.; Shevchenko, V.; Shires, A.; Coutinho, R.Silva; Simi, G.; Sirendi, M.; Skidmore, N.; Skwarnicki, T.; Smith, N.A.; Smith, E.; Smith, E.; Smith, J.; Smith, M.; Snoek, H.; Sokoloff, M.D.; Soler, F.J.P.; Soomro, F.; Souza, D.; Souza De Paula, B.; Spaan, B.; Sparkes, A.; Spradlin, P.; Stagni, F.; Stahl, M.; Stahl, S.; Steinkamp, O.; Stenyakin, O.; Stevenson, S.; Stoica, S.; Stone, S.; Storaci, B.; Stracka, S.; Straticiuc, M.; Straumann, U.; Stroili, R.; Subbiah, V.K.; Sun, L.; Sutcliffe, W.; Swientek, K.; Swientek, S.; Syropoulos, V.; Szczekowski, M.; Szczypka, P.; Szilard, D.; Szumlak, T.; T'Jampens, S.; Teklishyn, M.; Tellarini, G.; Teubert, F.; Thomas, C.; Thomas, E.; van Tilburg, J.; Tisserand, V.; Tobin, M.; Tolk, S.; Tomassetti, L.; Tonelli, D.; Topp-Joergensen, S.; Torr, N.; Tournefier, E.; Tourneur, S.; Tran, M.T.; Tresch, M.; Tsaregorodtsev, A.; Tsopelas, P.; Tuning, N.; Garcia, M.Ubeda; Ukleja, A.; Ustyuzhanin, A.; Uwer, U.; Vagnoni, V.; Valenti, G.; Vallier, A.; Vazquez Gomez, R.; Vazquez Regueiro, P.; Vazquez Sierra, C.; Vecchi, S.; Velthuis, J.J.; Veltri, M.; Veneziano, G.; Vesterinen, M.; Viaud, B.; Vieira, D.; Vieites Diaz, M.; Vilasis-Cardona, X.; Vollhardt, A.; Volyanskyy, D.; Voong, D.; Vorobyev, A.; Vorobyev, V.; Voss, C.; Voss, H.; de Vries, J.A.; Waldi, R.; Wallace, C.; Wallace, R.; Walsh, J.; Wandernoth, S.; Wang, J.; Ward, D.R.; Watson, N.K.; Websdale, D.; Whitehead, M.; Wicht, J.; Wiedner, D.; Wilkinson, G.; Williams, M.P.; Williams, M.; Wilson, F.F.; Wimberley, J.; Wishahi, J.; Wislicki, W.; Witek, M.; Wormser, G.; Wotton, S.A.; Wright, S.; Wu, S.; Wyllie, K.; Xie, Y.; Xing, Z.; Xu, Z.; Yang, Z.; Yuan, X.; Yushchenko, O.; Zangoli, M.; Zavertyaev, M.; Zhang, L.; Zhang, W.C.; Zhang, Y.; Zhelezov, A.; Zhokhov, A.; Zhong, L.; Zvyagin, A.

    2014-10-03

    A search for $CP$ violation in Cabibbo-suppressed $D^{\\pm}\\rightarrow K^0_S K^{\\pm}$ and $D^{\\pm}_{s}\\rightarrow K^0_S \\pi^{\\pm}$ decays is performed using $pp$ collision data, corresponding to an integrated luminosity of 3~fb$^{-1}$, recorded by the LHCb experiment. The individual $CP$-violating asymmetries are measured to be \\begin{eqnarray*} \\mathcal{A}_{CP}^{D^{\\pm}\\rightarrow K^0_S K^{\\pm}} & = & (+0.03 \\pm 0.17 \\pm 0.14) \\% \\\\ \\mathcal{A}_{CP}^{D^{\\pm}_s\\rightarrow K^0_S \\pi^{\\pm}} & = & (+0.38 \\pm 0.46 \\pm 0.17) \\%, \\end{eqnarray*} assuming that $CP$ violation in the Cabibbo-favoured decays is negligible. A combination of the measured asymmetries for the four decay modes $D^{\\pm}_{(s)}\\rightarrow K^0_S K^{\\pm}$ and $D^{\\pm}_{(s)}\\rightarrow K^0_S \\pi^{\\pm}$ gives the sum \\[ \\mathcal{A}_{CP}^{D^{\\pm}\\rightarrow K^0_S K^{\\pm}}+ \\mathcal{A}_{CP}^{D^{\\pm}_s\\rightarrow K^0_S \\pi^{\\pm}} = (+0.41 \\pm 0.49 \\pm 0.26) \\%. \\] In all cases, the first uncertainties are statistical and the second sys...

  5. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  6. Preventative maintenance cycle of contact switches for nuclear power plants based on lifetime assessment and economic analysis

    International Nuclear Information System (INIS)

    Shi Jie

    2010-01-01

    An approach to determine the preventive maintenance cycle was proposed in consideration of the lifetime, optimal cost and economy. Two parameters Weibull distribution was used to calculate the lifetime of contact switch. The block replacement model and age replacement model were built with the objective of optimal cost, and the preventive replacement cycle was accounted. Eight proposals for preventive replacement cycle were given. Economy model was applied to assess those proposals and the optimal proposal was confirmed. (authors)

  7. Numerical study of inventory management under various maintenance policies

    NARCIS (Netherlands)

    Poppe, J.; Basten, R.J.I.; Boute, R.N.; Lambrecht, M.R.

    2017-01-01

    Capital assets, such as manufacturing equipment, require maintenance to remain functioning. Maintenance can be performed when a component breaks down and needs replacement (i.e., corrective maintenance), or the maintenance and part replacement can be performed preventively. Preventive maintenance

  8. MPGV: An expert system for the preventive maintenance of the vapor generators in a PWR type reactor

    International Nuclear Information System (INIS)

    Castelanu, L.

    1990-01-01

    The characteristics and the architecture of the expert system designed for assisting the preventive maintenance of vapor generators are described. The main objectives of the system are: to optimize the inspection plans, to assess breakdown risks, to propose solutions and to organize maintenance operations. The expert system allows the accurate evaluation of risks concerning the development of an application. However, the experience demonstrates that a cost-benefit analysis not accurate enough induces errors in the expert system applications [fr

  9. JIT single machine scheduling problem with periodic preventive maintenance

    Science.gov (United States)

    Shahriari, Mohammadreza; Shoja, Naghi; Zade, Amir Ebrahimi; Barak, Sasan; Sharifi, Mani

    2016-09-01

    This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms.

  10. Maintenance technologies for reactor internals

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Kenji [Nuclear Energy Systems and Services Div., Toshiba Corp., Tokyo (Japan); Kobayashi, Masahiro [Toshiba Corp., Yokohama (Japan). Keihin Product Operations; Sano, Yuji; Kimura, Seiichiro [Power and Industrial Systems Research and Development Center, Toshiba Corp., Tokyo(Japan)

    2000-10-01

    Toshiba places the highest priority on maintenance technologies for the reactor pressure vessel (RPV) and its internals in operating nuclear power plants. This paper summarizes the status of applied laser maintenance technologies, both preventive and repair. For laser peeing and laser desensitization treatment (LDT) technologies in particular, field applications are also described in detail. In the future, the area of field applications for preventive maintenance, repair, and inspection technologies will be further expanded. (author)

  11. Measurement of CP violation in the phase space of $B^{\\pm} \\rightarrow K^{+} K^{-} \\pi^{\\pm}$ and $B^{\\pm} \\rightarrow \\pi^{+} \\pi^{-} \\pi^{\\pm}$ decays

    CERN Document Server

    Aaij, Roel; Adinolfi, Marco; Adrover, Cosme; Affolder, Anthony; Ajaltouni, Ziad; Albrecht, Johannes; Alessio, Federico; Alexander, Michael; Ali, Suvayu; Alkhazov, Georgy; Alvarez Cartelle, Paula; Alves Jr, Antonio; Amato, Sandra; Amerio, Silvia; Amhis, Yasmine; Anderlini, Lucio; Anderson, Jonathan; Andreassen, Rolf; Andrews, Jason; Appleby, Robert; Aquines Gutierrez, Osvaldo; Archilli, Flavio; Artamonov, Alexander; Artuso, Marina; Aslanides, Elie; Auriemma, Giulio; Baalouch, Marouen; Bachmann, Sebastian; Back, John; Badalov, Alexey; Baesso, Clarissa; Balagura, Vladislav; Baldini, Wander; Barlow, Roger; Barschel, Colin; Barsuk, Sergey; Barter, William; Bauer, Thomas; Bay, Aurelio; Beddow, John; Bedeschi, Franco; Bediaga, Ignacio; Belogurov, Sergey; Belous, Konstantin; Belyaev, Ivan; Ben-Haim, Eli; Bencivenni, Giovanni; Benson, Sean; Benton, Jack; Berezhnoy, Alexander; Bernet, Roland; Bettler, Mar-Olivier; van Beuzekom, Martinus; Bien, Alexander; Bifani, Simone; Bird, Thomas; Bizzeti, Andrea; Bjørnstad, Pål Marius; Blake, Thomas; Blanc, Frédéric; Blouw, Johan; Blusk, Steven; Bocci, Valerio; Bondar, Alexander; Bondar, Nikolay; Bonivento, Walter; Borghi, Silvia; Borgia, Alessandra; Bowcock, Themistocles; Bowen, Espen Eie; Bozzi, Concezio; Brambach, Tobias; van den Brand, Johannes; Bressieux, Joël; Brett, David; Britsch, Markward; Britton, Thomas; Brook, Nicholas; Brown, Henry; Bursche, Albert; Busetto, Giovanni; Buytaert, Jan; Cadeddu, Sandro; Callot, Olivier; Calvi, Marta; Calvo Gomez, Miriam; Camboni, Alessandro; Campana, Pierluigi; Campora Perez, Daniel; Carbone, Angelo; Carboni, Giovanni; Cardinale, Roberta; Cardini, Alessandro; Carranza-Mejia, Hector; Carson, Laurence; Carvalho Akiba, Kazuyoshi; Casse, Gianluigi; Castillo Garcia, Lucia; Cattaneo, Marco; Cauet, Christophe; Cenci, Riccardo; Charles, Matthew; Charpentier, Philippe; Cheung, Shu-Faye; Chiapolini, Nicola; Chrzaszcz, Marcin; Ciba, Krzystof; Cid Vidal, Xabier; Ciezarek, Gregory; Clarke, Peter; Clemencic, Marco; Cliff, Harry; Closier, Joel; Coca, Cornelia; Coco, Victor; Cogan, Julien; Cogneras, Eric; Collins, Paula; Comerma-Montells, Albert; Contu, Andrea; Cook, Andrew; Coombes, Matthew; Coquereau, Samuel; Corti, Gloria; Couturier, Benjamin; Cowan, Greig; Craik, Daniel Charles; Cruz Torres, Melissa Maria; Cunliffe, Samuel; Currie, Robert; D'Ambrosio, Carmelo; David, Pascal; David, Pieter; Davis, Adam; De Bonis, Isabelle; De Bruyn, Kristof; De Capua, Stefano; De Cian, Michel; De Miranda, Jussara; De Paula, Leandro; De Silva, Weeraddana; De Simone, Patrizia; Decamp, Daniel; Deckenhoff, Mirko; Del Buono, Luigi; Déléage, Nicolas; Derkach, Denis; Deschamps, Olivier; Dettori, Francesco; Di Canto, Angelo; Dijkstra, Hans; Dogaru, Marius; Donleavy, Stephanie; Dordei, Francesca; Dosil Suárez, Alvaro; Dossett, David; Dovbnya, Anatoliy; Dupertuis, Frederic; Durante, Paolo; Dzhelyadin, Rustem; Dziurda, Agnieszka; Dzyuba, Alexey; Easo, Sajan; Egede, Ulrik; Egorychev, Victor; Eidelman, Semen; van Eijk, Daan; Eisenhardt, Stephan; Eitschberger, Ulrich; Ekelhof, Robert; Eklund, Lars; El Rifai, Ibrahim; Elsasser, Christian; Falabella, Antonio; Färber, Christian; Farinelli, Chiara; Farry, Stephen; Ferguson, Dianne; Fernandez Albor, Victor; Ferreira Rodrigues, Fernando; Ferro-Luzzi, Massimiliano; Filippov, Sergey; Fiore, Marco; Fitzpatrick, Conor; Fontana, Marianna; Fontanelli, Flavio; Forty, Roger; Francisco, Oscar; Frank, Markus; Frei, Christoph; Frosini, Maddalena; Furfaro, Emiliano; Gallas Torreira, Abraham; Galli, Domenico; Gandelman, Miriam; Gandini, Paolo; Gao, Yuanning; Garofoli, Justin; Garosi, Paola; Garra Tico, Jordi; Garrido, Lluis; Gaspar, Clara; Gauld, Rhorry; Gersabeck, Evelina; Gersabeck, Marco; Gershon, Timothy; Ghez, Philippe; Gibson, Valerie; Giubega, Lavinia-Helena; Gligorov, V.V.; Göbel, Carla; Golubkov, Dmitry; Golutvin, Andrey; Gomes, Alvaro; Gorbounov, Petr; Gordon, Hamish; Grabalosa Gándara, Marc; Graciani Diaz, Ricardo; Granado Cardoso, Luis Alberto; Graugés, Eugeni; Graziani, Giacomo; Grecu, Alexandru; Greening, Edward; Gregson, Sam; Griffith, Peter; Grillo, Lucia; Grünberg, Oliver; Gui, Bin; Gushchin, Evgeny; Guz, Yury; Gys, Thierry; Hadjivasiliou, Christos; Haefeli, Guido; Haen, Christophe; Haines, Susan; Hall, Samuel; Hamilton, Brian; Hampson, Thomas; Hansmann-Menzemer, Stephanie; Harnew, Neville; Harnew, Samuel; Harrison, Jonathan; Hartmann, Thomas; He, Jibo; Head, Timothy; Heijne, Veerle; Hennessy, Karol; Henrard, Pierre; Hernando Morata, Jose Angel; van Herwijnen, Eric; Heß, Miriam; Hicheur, Adlène; Hicks, Emma; Hill, Donal; Hoballah, Mostafa; Hombach, Christoph; Hulsbergen, Wouter; Hunt, Philip; Huse, Torkjell; Hussain, Nazim; Hutchcroft, David; Hynds, Daniel; Iakovenko, Viktor; Idzik, Marek; Ilten, Philip; Jacobsson, Richard; Jaeger, Andreas; Jans, Eddy; Jaton, Pierre; Jawahery, Abolhassan; Jing, Fanfan; John, Malcolm; Johnson, Daniel; Jones, Christopher; Joram, Christian; Jost, Beat; Kaballo, Michael; Kandybei, Sergii; Kanso, Wallaa; Karacson, Matthias; Karbach, Moritz; Kenyon, Ian; Ketel, Tjeerd; Khanji, Basem; Kochebina, Olga; Komarov, Ilya; Koopman, Rose; Koppenburg, Patrick; Korolev, Mikhail; Kozlinskiy, Alexandr; Kravchuk, Leonid; Kreplin, Katharina; Kreps, Michal; Krocker, Georg; Krokovny, Pavel; Kruse, Florian; Kucharczyk, Marcin; Kudryavtsev, Vasily; Kurek, Krzysztof; Kvaratskheliya, Tengiz; La Thi, Viet Nga; Lacarrere, Daniel; Lafferty, George; Lai, Adriano; Lambert, Dean; Lambert, Robert W; Lanciotti, Elisa; Lanfranchi, Gaia; Langenbruch, Christoph; Latham, Thomas; Lazzeroni, Cristina; Le Gac, Renaud; van Leerdam, Jeroen; Lees, Jean-Pierre; Lefèvre, Regis; Leflat, Alexander; Lefrançois, Jacques; Leo, Sabato; Leroy, Olivier; Lesiak, Tadeusz; Leverington, Blake; Li, Yiming; Li Gioi, Luigi; Liles, Myfanwy; Lindner, Rolf; Linn, Christian; Liu, Bo; Liu, Guoming; Lohn, Stefan; Longstaff, Ian; Lopes, Jose; Lopez-March, Neus; Lu, Haiting; Lucchesi, Donatella; Luisier, Johan; Luo, Haofei; Lupton, Oliver; Machefert, Frederic; Machikhiliyan, Irina V; Maciuc, Florin; Maev, Oleg; Malde, Sneha; Manca, Giulia; Mancinelli, Giampiero; Maratas, Jan; Marconi, Umberto; Marino, Pietro; Märki, Raphael; Marks, Jörg; Martellotti, Giuseppe; Martens, Aurelien; Martín Sánchez, Alexandra; Martinelli, Maurizio; Martinez Santos, Diego; Martins Tostes, Danielle; Martynov, Aleksandr; Massafferri, André; Matev, Rosen; Mathe, Zoltan; Matteuzzi, Clara; Maurice, Emilie; Mazurov, Alexander; McCarthy, James; McNab, Andrew; McNulty, Ronan; McSkelly, Ben; Meadows, Brian; Meier, Frank; Meissner, Marco; Merk, Marcel; Milanes, Diego Alejandro; Minard, Marie-Noelle; Molina Rodriguez, Josue; Monteil, Stephane; Moran, Dermot; Morawski, Piotr; Mordà, Alessandro; Morello, Michael Joseph; Mountain, Raymond; Mous, Ivan; Muheim, Franz; Müller, Katharina; Muresan, Raluca; Muryn, Bogdan; Muster, Bastien; Naik, Paras; Nakada, Tatsuya; Nandakumar, Raja; Nasteva, Irina; Needham, Matthew; Neubert, Sebastian; Neufeld, Niko; Nguyen, Anh Duc; Nguyen, Thi-Dung; Nguyen-Mau, Chung; Nicol, Michelle; Niess, Valentin; Niet, Ramon; Nikitin, Nikolay; Nikodem, Thomas; Nomerotski, Andrey; Novoselov, Alexey; Oblakowska-Mucha, Agnieszka; Obraztsov, Vladimir; Oggero, Serena; Ogilvy, Stephen; Okhrimenko, Oleksandr; Oldeman, Rudolf; Orlandea, Marius; Otalora Goicochea, Juan Martin; Owen, Patrick; Oyanguren, Maria Arantza; Pal, Bilas Kanti; Palano, Antimo; Palutan, Matteo; Panman, Jacob; Papanestis, Antonios; Pappagallo, Marco; Parkes, Christopher; Parkinson, Christopher John; Passaleva, Giovanni; Patel, Girish; Patel, Mitesh; Patrick, Glenn; Patrignani, Claudia; Pavel-Nicorescu, Carmen; Pazos Alvarez, Antonio; Pearce, Alex; Pellegrino, Antonio; Penso, Gianni; Pepe Altarelli, Monica; Perazzini, Stefano; Perez Trigo, Eliseo; Pérez-Calero Yzquierdo, Antonio; Perret, Pascal; Perrin-Terrin, Mathieu; Pescatore, Luca; Pesen, Erhan; Pessina, Gianluigi; Petridis, Konstantin; Petrolini, Alessandro; Phan, Anna; Picatoste Olloqui, Eduardo; Pietrzyk, Boleslaw; Pilař, Tomas; Pinci, Davide; Playfer, Stephen; Plo Casasus, Maximo; Polci, Francesco; Polok, Grzegorz; Poluektov, Anton; Polycarpo, Erica; Popov, Alexander; Popov, Dmitry; Popovici, Bogdan; Potterat, Cédric; Powell, Andrew; Prisciandaro, Jessica; Pritchard, Adrian; Prouve, Claire; Pugatch, Valery; Puig Navarro, Albert; Punzi, Giovanni; Qian, Wenbin; Rachwal, Bartolomiej; Rademacker, Jonas; Rakotomiaramanana, Barinjaka; Rangel, Murilo; Raniuk, Iurii; Rauschmayr, Nathalie; Raven, Gerhard; Redford, Sophie; Reichert, Stefanie; Reid, Matthew; dos Reis, Alberto; Ricciardi, Stefania; Richards, Alexander; Rinnert, Kurt; Rives Molina, Vincente; Roa Romero, Diego; Robbe, Patrick; Roberts, Douglas; Rodrigues, Ana Barbara; Rodrigues, Eduardo; Rodriguez Perez, Pablo; Roiser, Stefan; Romanovsky, Vladimir; Romero Vidal, Antonio; Rotondo, Marcello; Rouvinet, Julien; Ruf, Thomas; Ruffini, Fabrizio; Ruiz, Hugo; Ruiz Valls, Pablo; Sabatino, Giovanni; Saborido Silva, Juan Jose; Sagidova, Naylya; Sail, Paul; Saitta, Biagio; Salustino Guimaraes, Valdir; Sanmartin Sedes, Brais; Santacesaria, Roberta; Santamarina Rios, Cibran; Santovetti, Emanuele; Sapunov, Matvey; Sarti, Alessio; Satriano, Celestina; Satta, Alessia; Savrie, Mauro; Savrina, Darya; Schiller, Manuel; Schindler, Heinrich; Schlupp, Maximilian; Schmelling, Michael; Schmidt, Burkhard; Schneider, Olivier; Schopper, Andreas; Schune, Marie Helene; Schwemmer, Rainer; Sciascia, Barbara; Sciubba, Adalberto; Seco, Marcos; Semennikov, Alexander; Senderowska, Katarzyna; Sepp, Indrek; Serra, Nicola; Serrano, Justine; Seyfert, Paul; Shapkin, Mikhail; Shapoval, Illya; Shcheglov, Yury; Shears, Tara; Shekhtman, Lev; Shevchenko, Oksana; Shevchenko, Vladimir; Shires, Alexander; Silva Coutinho, Rafael; Sirendi, Marek; Skidmore, Nicola; Skwarnicki, Tomasz; Smith, Anthony; Smith, Edmund; Smith, Eluned; Smith, Jackson; Smith, Mark; Sokoloff, Michael; Soler, Paul; Soomro, Fatima; Souza, Daniel; Souza De Paula, Bruno; Spaan, Bernhard; Sparkes, Ailsa; Spradlin, Patrick; Stagni, Federico; Stahl, Sascha; Steinkamp, Olaf; Stevenson, Scott; Stoica, Sabin; Stone, Sheldon; Storaci, Barbara; Straticiuc, Mihai; Straumann, Ulrich; Subbiah, Vijay Kartik; Sun, Liang; Sutcliffe, William; Swientek, Stefan; Syropoulos, Vasileios; Szczekowski, Marek; Szczypka, Paul; Szilard, Daniela; Szumlak, Tomasz; T'Jampens, Stephane; Teklishyn, Maksym; Teodorescu, Eliza; Teubert, Frederic; Thomas, Christopher; Thomas, Eric; van Tilburg, Jeroen; Tisserand, Vincent; Tobin, Mark; Tolk, Siim; Tonelli, Diego; Topp-Joergensen, Stig; Torr, Nicholas; Tournefier, Edwige; Tourneur, Stephane; Tran, Minh Tâm; Tresch, Marco; Tsaregorodtsev, Andrei; Tsopelas, Panagiotis; Tuning, Niels; Ubeda Garcia, Mario; Ukleja, Artur; Ustyuzhanin, Andrey; Uwer, Ulrich; Vagnoni, Vincenzo; Valenti, Giovanni; Vallier, Alexis; Vazquez Gomez, Ricardo; Vazquez Regueiro, Pablo; Vázquez Sierra, Carlos; Vecchi, Stefania; Velthuis, Jaap; Veltri, Michele; Veneziano, Giovanni; Vesterinen, Mika; Viaud, Benoit; Vieira, Daniel; Vilasis-Cardona, Xavier; Vollhardt, Achim; Volyanskyy, Dmytro; Voong, David; Vorobyev, Alexey; Vorobyev, Vitaly; Voß, Christian; Voss, Helge; Waldi, Roland; Wallace, Charlotte; Wallace, Ronan; Wandernoth, Sebastian; Wang, Jianchun; Ward, David; Watson, Nigel; Webber, Adam Dane; Websdale, David; Whitehead, Mark; Wicht, Jean; Wiechczynski, Jaroslaw; Wiedner, Dirk; Wiggers, Leo; Wilkinson, Guy; Williams, Matthew; Williams, Mike; Wilson, Fergus; Wimberley, Jack; Wishahi, Julian; Wislicki, Wojciech; Witek, Mariusz; Wormser, Guy; Wotton, Stephen; Wright, Simon; Wu, Suzhi; Wyllie, Kenneth; Xie, Yuehong; Xing, Zhou; Yang, Zhenwei; Yuan, Xuhao; Yushchenko, Oleg; Zangoli, Maria; Zavertyaev, Mikhail; Zhang, Feng; Zhang, Liming; Zhang, Wen Chao; Zhang, Yanxi; Zhelezov, Alexey; Zhokhov, Anatoly; Zhong, Liang; Zvyagin, Alexander

    2014-01-01

    The charmless decays $B^{\\pm} \\rightarrow K^{+}K^{-}\\pi^{\\pm}$ and $B^{\\pm} \\rightarrow \\pi^{+}\\pi^{-}\\pi^{\\pm}$ are reconstructed in a data set, corresponding to an integrated luminosity of 1.0 fb$^{-1}$ of pp collisions at a center-of-mass energy of 7 TeV, collected by LHCb in 2011. The inclusive charge asymmetries of these modes are measured to be $A_{CP}(B^{\\pm} \\rightarrow K^{+}K^{-}\\pi^{\\pm}) =-0.141 \\pm 0.040 (stat) \\pm 0.018 (syst) \\pm 0.007 (J/\\psi K^{\\pm})$ and $A_{CP}(B^{\\pm} \\rightarrow \\pi^{+}\\pi^{-}\\pi^{\\pm}) = 0.117 \\pm 0.021 (stat) \\pm 0.009 (syst) \\pm 0.007 (J/\\psi K^{\\pm})$, where the third uncertainty is due to the CP asymmetry of the $B^{\\pm} \\rightarrow J/\\psi K^{\\pm}$ reference mode. In addition to the inclusive CP asymmetries, larger asymmetries are observed in localized regions of phase space.

  12. Exposure of bakery and pastry apprentices to airborne flour dust using PM2.5 and PM10 personal samplers.

    Science.gov (United States)

    Mounier-Geyssant, Estelle; Barthélemy, Jean-François; Mouchot, Lory; Paris, Christophe; Zmirou-Navier, Denis

    2007-11-01

    This study describes exposure levels of bakery and pastry apprentices to flour dust, a known risk factor of occupational asthma. Questionnaires on work activity were completed by 286 students. Among them, 34 performed a series of two personal exposure measurements using a PM2.5 and PM10 personal sampler during a complete work shift, one during a cold ("winter") period, and the other during a hot ("summer") period. Bakery apprentices experience greater average PM2.5 and PM10 exposures than pastry apprentices (p < 0.006). Exposure values for both particulate fractions are greater in winter (average PM10 values among bakers = 1.10 mg.m-3 [standard deviation: 0.83]) than in summer (0.63 mg.m-3 [0.36]). While complying with current European occupational limit values, these exposures exceed the ACGIH recommendations set to prevent sensitization to flour dust (0.5 mg.m-3). Over half the facilities had no ventilation system. Young bakery apprentices incur substantial exposure to known airways allergens, a situation that might elicit early induction of airways inflammation.

  13. Using the intervention mapping protocol to develop a maintenance programme for the SLIMMER diabetes prevention intervention.

    Science.gov (United States)

    Elsman, Ellen B M; Leerlooijer, Joanne N; Ter Beek, Josien; Duijzer, Geerke; Jansen, Sophia C; Hiddink, Gerrit J; Feskens, Edith J M; Haveman-Nies, Annemien

    2014-10-27

    Although lifestyle interventions have shown to be effective in reducing the risk for type 2 diabetes mellitus, maintenance of achieved results is difficult, as participants often experience relapse after the intervention has ended. This paper describes the systematic development of a maintenance programme for the extensive SLIMMER intervention, an existing diabetes prevention intervention for high-risk individuals, implemented in a real-life setting in the Netherlands. The maintenance programme was developed using the Intervention Mapping protocol. Programme development was informed by a literature study supplemented by various focus group discussions and feedback from implementers of the extensive SLIMMER intervention. The maintenance programme was designed to sustain a healthy diet and physical activity pattern by targeting knowledge, attitudes, subjective norms and perceived behavioural control of the SLIMMER participants. Practical applications were clustered into nine programme components, including sports clinics at local sports clubs, a concluding meeting with the physiotherapist and dietician, and a return session with the physiotherapist, dietician and physical activity group. Manuals were developed for the implementers and included a detailed time table and step-by-step instructions on how to implement the maintenance programme. The Intervention Mapping protocol provided a useful framework to systematically plan a maintenance programme for the extensive SLIMMER intervention. The study showed that planning a maintenance programme can build on existing implementation structures of the extensive programme. Future research is needed to determine to what extent the maintenance programme contributes to sustained effects in participants of lifestyle interventions.

  14. An overview of a knowledge based system for preventive maintenance support of nuclear power plants

    International Nuclear Information System (INIS)

    Terano, Takao; Nishiyama, Takuya; Yokoo, Takeshi

    1984-01-01

    In recent years, much interest has been paid to knowledge engineering techniques for new vehicles of advanced information processing. As a practical application in electric power industry, this report discusses a knowledge based system for supporting preventive maintenance of nuclear power plants. To support preventive maintenance tasks, the system must have facilities to reason failures and accidents of the plants, to evaluate their significance, to predict any possible troubles, and to indentify appropriate preventive countermeasures for them. This report describes the overview of the prototype system from a viewpoint of knowledge engineering. The results of the study are as follows: (1) The knowledge base of the prototype system consists of a data-base on plants and a rule-base derived from experts' knowledge. Using the information in the knowledge base, the system diagnoses the plant without real-time interaction with operational plants. (2) Expert's knowledge in the rule-base is represented in the non-procedural declarative forms. These rules are organized in some hierarchical structure so as to be used efficiently and used in conjunction with the corresponding set of plant information in the data-base. (3) The prototype system is incrementally developed with the rapid prototyping techniques, that is, the processes of design, implementation and evaluation are repeated several times. (author)

  15. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  16. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  17. Joint optimization of preventive maintenance and spare parts inventory for an optimal production plan with consideration of CO_2 emission

    International Nuclear Information System (INIS)

    Ba, Kader; Dellagi, Sofiene; Rezg, Nidhal; Erray, Walid

    2016-01-01

    This article presents a joint optimization of spare parts inventory and preventive maintenance. While minimizing CO_2 emissions, this approach is based on an optimal production plan achieved thanks to the HMMS model. The process which is studied in this paper only manufactures one type of product. The purpose of the paper is to determine for a random demand over a given period, a cost-effective production plan and a maintenance policy which integrates a spare parts strategy in accordance with environmental requirements and regulations. Our green spare parts management can be defined as a set of actions that are applied in order to decrease the spare parts footprint in its lifetime (Ba et al., 2015) [1]. Indeed, we take into account the spare parts characteristics (new or used) which will be used during maintenance actions (preventive or corrective) to preserve the environment. Consequently, we set up analytical models based on the effect of the production rate on the system deterioration so as to substantially cut the maintenance costs, production costs and CO_2 emissions. To evaluate the performance of our models, we give some illustrative examples. - Highlights: • Establishment of an optimal production plan for a manufacturing process. • Cost-effective maintenance strategy with a green spare parts strategy. • Possibility to choose between used and new spare parts to execute maintenance action.

  18. Joint redundancy and imperfect preventive maintenance optimization for series–parallel multi-state degraded systems

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Châtelet, Eric; Nahas, Nabil

    2012-01-01

    This paper formulates a joint redundancy and imperfect preventive maintenance planning optimization model for series–parallel multi-state degraded systems. Non identical multi-state components can be used in parallel to improve the system availability by providing redundancy in subsystems. Multiple component choices are available in the market for each subsystem. The status of each component is considered to degrade with use. The objective is to determine jointly the maximal-availability series–parallel system structure and the appropriate preventive maintenance actions, subject to a budget constraint. System availability is defined as the ability to satisfy consumer demand that is represented as a piecewise cumulative load curve. A procedure is used, based on Markov processes and universal moment generating function, to evaluate the multi-state system availability and the cost function. A heuristic approach is also proposed to solve the formulated problem. This heuristic is based on a combination of space partitioning, genetic algorithms (GA) and tabu search (TS). After dividing the search space into a set of disjoint subsets, this approach uses GA to select the subspaces, and applies TS to each selected sub-space.

  19. Measurement of $C\\!P$ violation in the phase space of $B^{\\pm} \\to K^{\\pm} \\pi^{+} \\pi^{-}$ and $B^{\\pm} \\to K^{\\pm} K^{+} K^{-}$ decays

    CERN Document Server

    INSPIRE-00258707; Adeva, B; Adinolfi, M; Adrover, C; Affolder, A; Ajaltouni, Z; Albrecht, J; Alessio, F; Alexander, M; Ali, S; Alkhazov, G; Alvarez Cartelle, P; Alves Jr, A A; Amato, S; Amerio, S; Amhis, Y; Anderlini, L; Anderson, J; Andreassen, R; Andrews, J E; Appleby, R B; Aquines Gutierrez, O; Archilli, F; Artamonov, A; Artuso, M; Aslanides, E; Auriemma, G; Baalouch, M; Bachmann, S; Back, J J; Baesso, C; Balagura, V; Baldini, W; Barlow, R J; Barschel, C; Barsuk, S; Barter, W; Bauer, Th; Bay, A; Beddow, J; Bedeschi, F; Bediaga, I; Belogurov, S; Belous, K; Belyaev, I; Ben-Haim, E; Bencivenni, G; Benson, S; Benton, J; Berezhnoy, A; Bernet, R; Bettler, M -O; van Beuzekom, M; Bien, A; Bifani, S; Bird, T; Bizzeti, A; Bjørnstad, P M; Blake, T; Blanc, F; Blouw, J; Blusk, S; Bocci, V; Bondar, A; Bondar, N; Bonivento, W; Borghi, S; Borgia, A; Bowcock, T J V; Bowen, E; Bozzi, C; Brambach, T; van den Brand, J; Bressieux, J; Brett, D; Britsch, M; Britton, T; Brook, N H; Brown, H; Burducea, I; Bursche, A; Busetto, G; Buytaert, J; Cadeddu, S; Callot, O; Calvi, M; Calvo Gomez, M; Camboni, A; Campana, P; Campora Perez, D; Carbone, A; Carboni, G; Cardinale, R; Cardini, A; Carranza-Mejia, H; Carson, L; Carvalho Akiba, K; Casse, G; Castillo Garcia, L; Cattaneo, M; Cauet, Ch; Cenci, R; Charles, M; Charpentier, Ph; Chen, P; Chiapolini, N; Chrzaszcz, M; Ciba, K; Cid Vidal, X; Ciezarek, G; Clarke, P E L; Clemencic, M; Cliff, H V; Closier, J; Coca, C; Coco, V; Cogan, J; Cogneras, E; Collins, P; Comerma-Montells, A; Contu, A; Cook, A; Coombes, M; Coquereau, S; Corti, G; Couturier, B; Cowan, G A; Craik, D C; Cunliffe, S; Currie, R; D'Ambrosio, C; David, P; David, P N Y; Davis, A; De Bonis, I; De Bruyn, K; De Capua, S; De Cian, M; De Miranda, J M; De Paula, L; De Silva, W; De Simone, P; Decamp, D; Deckenhoff, M; Del Buono, L; Déléage, N; Derkach, D; Deschamps, O; Dettori, F; Di Canto, A; Di Ruscio, F; Dijkstra, H; Dogaru, M; Donleavy, S; Dordei, F; Dosil Suárez, A; Dossett, D; Dovbnya, A; Dupertuis, F; Dzhelyadin, R; Dziurda, A; Dzyuba, A; Easo, S; Egede, U; Egorychev, V; Eidelman, S; van Eijk, D; Eisenhardt, S; Eitschberger, U; Ekelhof, R; Eklund, L; El Rifai, I; Elsasser, Ch; Elsby, D; Falabella, A; Färber, C; Fardell, G; Farinelli, C; Farry, S; Fave, V; Ferguson, D; Fernandez Albor, V; Ferreira Rodrigues, F; Ferro-Luzzi, M; Filippov, S; Fiore, M; Fitzpatrick, C; Fontana, M; Fontanelli, F; Forty, R; Francisco, O; Frank, M; Frei, C; Frosini, M; Furcas, S; Furfaro, E; Gallas Torreira, A; Galli, D; Gandelman, M; Gandini, P; Gao, Y; Garofoli, J; Garosi, P; Garra Tico, J; Garrido, L; Gaspar, C; Gauld, R; Gersabeck, E; Gersabeck, M; Gershon, T; Ghez, Ph; Gibson, V; Giubega, L; Gligorov, V V; Göbel, C; Golubkov, D; Golutvin, A; Gomes, A; Gordon, H; Grabalosa Gándara, M; Graciani Diaz, R; Granado Cardoso, L A; Graugés, E; Graziani, G; Grecu, A; Greening, E; Gregson, S; Griffith, P; Grünberg, O; Gui, B; Gushchin, E; Guz, Yu; Gys, T; Hadjivasiliou, C; Haefeli, G; Haen, C; Haines, S C; Hall, S; Hamilton, B; Hampson, T; Hansmann-Menzemer, S; Harnew, N; Harnew, S T; Harrison, J; Hartmann, T; He, J; Head, T; Heijne, V; Hennessy, K; Henrard, P; Hernando Morata, J A; van Herwijnen, E; Hicheur, A; Hicks, E; Hill, D; Hoballah, M; Holtrop, M; Hombach, C; Hopchev, P; Hulsbergen, W; Hunt, P; Huse, T; Hussain, N; Hutchcroft, D; Hynds, D; Iakovenko, V; Idzik, M; Ilten, P; Jacobsson, R; Jaeger, A; Jans, E; Jaton, P; Jawahery, A; Jing, F; John, M; Johnson, D; Jones, C R; Joram, C; Jost, B; Kaballo, M; Kandybei, S; Kanso, W; Karacson, M; Karbach, T M; Kenyon, I R; Ketel, T; Keune, A; Khanji, B; Kochebina, O; Komarov, I; Koopman, R F; Koppenburg, P; Korolev, M; Kozlinskiy, A; Kravchuk, L; Kreplin, K; Kreps, M; Krocker, G; Krokovny, P; Kruse, F; Kucharczyk, M; Kudryavtsev, V; Kvaratskheliya, T; La Thi, V N; Lacarrere, D; Lafferty, G; Lai, A; Lambert, D; Lambert, R W; Lanciotti, E; Lanfranchi, G; Langenbruch, C; Latham, T; Lazzeroni, C; Le Gac, R; van Leerdam, J; Lees, J -P; Lefèvre, R; Leflat, A; Lefrançois, J; Leo, S; Leroy, O; Lesiak, T; Leverington, B; Li, Y; Li Gioi, L; Liles, M; Lindner, R; Linn, C; Liu, B; Liu, G; Lohn, S; Longstaff, I; Lopes, J H; Lopez-March, N; Lu, H; Lucchesi, D; Luisier, J; Luo, H; Machefert, F; Machikhiliyan, I V; Maciuc, F; Maev, O; Malde, S; Manca, G; Mancinelli, G; Marconi, U; Märki, R; Marks, J; Martellotti, G; Martens, A; Martín Sánchez, A; Martinelli, M; Martinez Santos, D; Martins Tostes, D; Massafferri, A; Matev, R; Mathe, Z; Matteuzzi, C; Maurice, E; Mazurov, A; Mc Skelly, B; McCarthy, J; McNab, A; McNulty, R; Meadows, B; Meier, F; Meissner, M; Merk, M; Milanes, D A; Minard, M -N; Molina Rodriguez, J; Monteil, S; Moran, D; Morawski, P; Mordà, A; Morello, M J; Mountain, R; Mous, I; Muheim, F; Müller, K; Muresan, R; Muryn, B; Muster, B; Naik, P; Nakada, T; Nandakumar, R; Nasteva, I; Needham, M; Neubert, S; Neufeld, N; Nguyen, A D; Nguyen, T D; Nguyen-Mau, C; Nicol, M; Niess, V; Niet, R; Nikitin, N; Nikodem, T; Nomerotski, A; Novoselov, A; Oblakowska-Mucha, A; Obraztsov, V; Oggero, S; Ogilvy, S; Okhrimenko, O; Oldeman, R; Orlandea, M; Otalora Goicochea, J M; Owen, P; Oyanguren, A; Pal, B K; Palano, A; Palutan, M; Panman, J; Papanestis, A; Pappagallo, M; Parkes, C; Parkinson, C J; Passaleva, G; Patel, G D; Patel, M; Patrick, G N; Patrignani, C; Pavel-Nicorescu, C; Pazos Alvarez, A; Pellegrino, A; Penso, G; Pepe Altarelli, M; Perazzini, S; Perez Trigo, E; Pérez-Calero Yzquierdo, A; Perret, P; Perrin-Terrin, M; Pessina, G; Petridis, K; Petrolini, A; Phan, A; Picatoste Olloqui, E; Pietrzyk, B; Pilař, T; Pinci, D; Playfer, S; Plo Casasus, M; Polci, F; Polok, G; Poluektov, A; Polycarpo, E; Popov, A; Popov, D; Popovici, B; Potterat, C; Powell, A; Prisciandaro, J; Pritchard, A; Prouve, C; Pugatch, V; Puig Navarro, A; Punzi, G; Qian, W; Rademacker, J H; Rakotomiaramanana, B; Rangel, M S; Raniuk, I; Rauschmayr, N; Raven, G; Redford, S; Reid, M M; dos Reis, A C; Ricciardi, S; Richards, A; Rinnert, K; Rives Molina, V; Roa Romero, D A; Robbe, P; Roberts, D A; Rodrigues, E; Rodriguez Perez, P; Roiser, S; Romanovsky, V; Romero Vidal, A; Rouvinet, J; Ruf, T; Ruffini, F; Ruiz, H; Ruiz Valls, P; Sabatino, G; Saborido Silva, J J; Sagidova, N; Sail, P; Saitta, B; Salustino Guimaraes, V; Salzmann, C; Sanmartin Sedes, B; Sannino, M; Santacesaria, R; Santamarina Rios, C; Santovetti, E; Sapunov, M; Sarti, A; Satriano, C; Satta, A; Savrie, M; Savrina, D; Schaack, P; Schiller, M; Schindler, H; Schlupp, M; Schmelling, M; Schmidt, B; Schneider, O; Schopper, A; Schune, M -H; Schwemmer, R; Sciascia, B; Sciubba, A; Seco, M; Semennikov, A; Sepp, I; Serra, N; Serrano, J; Seyfert, P; Shapkin, M; Shapoval, I; Shatalov, P; Shcheglov, Y; Shears, T; Shekhtman, L; Shevchenko, O; Shevchenko, V; Shires, A; Silva Coutinho, R; Sirendi, M; Skwarnicki, T; Smith, N A; Smith, E; Smith, J; Smith, M; Sokoloff, M D; Soler, F J P; Soomro, F; Souza, D; Souza De Paula, B; Spaan, B; Sparkes, A; Spradlin, P; Stagni, F; Stahl, S; Steinkamp, O; Stoica, S; Stone, S; Storaci, B; Straticiuc, M; Straumann, U; Subbiah, V K; Sun, L; Swientek, S; Syropoulos, V; Szczekowski, M; Szczypka, P; Szumlak, T; T'Jampens, S; Teklishyn, M; Teodorescu, E; Teubert, F; Thomas, C; Thomas, E; van Tilburg, J; Tisserand, V; Tobin, M; Tolk, S; Tonelli, D; Topp-Joergensen, S; Torr, N; Tournefier, E; Tourneur, S; Tran, M T; Tresch, M; Tsaregorodtsev, A; Tsopelas, P; Tuning, N; Ubeda Garcia, M; Ukleja, A; Urner, D; Ustyuzhanin, A; Uwer, U; Vagnoni, V; Valenti, G; Vallier, A; Van Dijk, M; Vazquez Gomez, R; Vazquez Regueiro, P; Vázquez Sierra, C; Vecchi, S; Velthuis, J J; Veltri, M; Veneziano, G; Vesterinen, M; Viaud, B; Vieira, D; Vilasis-Cardona, X; Vollhardt, A; Volyanskyy, D; Voong, D; Vorobyev, A; Vorobyev, V; Voß, C; Voss, H; Waldi, R; Wallace, C; Wallace, R; Wandernoth, S; Wang, J; Ward, D R; Watson, N K; Webber, A D; Websdale, D; Whitehead, M; Wicht, J; Wiechczynski, J; Wiedner, D; Wiggers, L; Wilkinson, G; Williams, M P; Williams, M; Wilson, F F; Wimberley, J; Wishahi, J; Witek, M; Wotton, S A; Wright, S; Wu, S; Wyllie, K; Xie, Y; Xing, Z; Yang, Z; Young, R; Yuan, X; Yushchenko, O; Zangoli, M; Zavertyaev, M; Zhang, F; Zhang, L; Zhang, W C; Zhang, Y; Zhelezov, A; Zhokhov, A; Zhong, L; Zvyagin, A

    2013-01-01

    The charmless decays $B^{\\pm}\\to K^{\\pm}\\pi^+\\pi^-$ and $B^{\\pm}\\to K^{\\pm}K^+K^-$ are reconstructed using data, corresponding to an integrated luminosity of 1.0 fb$^{-1}$, collected by LHCb in 2011. The inclusive charge asymmetries of these modes are measured as $A_{C\\!P}(B^{\\pm}\\to K^{\\pm}\\pi^+\\pi^-) = 0.032 \\pm 0.008 {\\mathrm{\\,(stat)}} \\pm 0.004 {\\mathrm{\\,(syst)}} \\pm 0.007 (J/\\psi K^{\\pm})$ and $A_{C\\!P}(B^{\\pm}\\to K^{\\pm}K^+K^-) = -0.043 \\pm 0.009 {\\mathrm{\\,(stat)}} \\pm 0.003 {\\mathrm{\\,(syst)}} \\pm 0.007 (J/\\psi K^{\\pm})$, where the third uncertainty is due to the $C\\!P$ asymmetry of the $B^{\\pm}\\to J/\\psi K^{\\pm}$ reference mode. The significance of $A_{C\\!P}(B^{\\pm}\\to K^{\\pm}K^+K^-)$ exceeds three standard deviations and is the first evidence of an inclusive $C\\!P$ asymmetry in charmless three-body $B$ decays. In addition to the inclusive $C\\!P$ asymmetries, larger asymmetries are observed in localised regions of phase space.

  20. Maintenance of systemic immune functions prevents accelerated presbycusis.

    Science.gov (United States)

    Iwai, Hiroshi; Baba, Susumu; Omae, Mariko; Lee, Shinryu; Yamashita, Toshio; Ikehara, Susumu

    2008-05-07

    There is no effective therapy for progressive hearing loss such as presbycusis, the causes of which remain poorly understood because of the difficulty of separating genetic and environmental contributions. In the present study, we show that the age-related dysfunctions of the systemic immune system in an animal model of accelerated presbycusis (SAMP1, senescence-accelerated mouse P1) can be corrected by allogeneic bone marrow transplantation (BMT). We also demonstrate that this presbycusis can be prevented; BMT protects the recipients from age-related hearing impairment and the degeneration of spiral ganglion cells (SGCs) as well as the dysfunctions of T lymphocytes, which have a close relation to immune senescence. No donor cells are infiltrated to the spiral ganglia, confirming that this experimental system using BMT is connected to the systemic immune system and does not contribute to transdifferentiation or fusion by donor hematopoietic stem cells (HSCs), or to the direct maintenance of ganglion cells by locally infiltrated donor immunocompetent cells. Therefore, another procedure which attempts to prevent the age-related dysfunctions of the recipient immune system is the inoculation of syngeneic splenocytes from young donors. These mice show no development of hearing loss, compared with the recipient mice with inoculation of saline or splenocytes from old donors. Our studies on the relationship between age-related systemic immune dysfunctions and neurodegeneration mechanisms open up new avenues of treatment for presbycusis, for which there is no effective therapy.

  1. A probabilistic maintenance model for diesel engines

    Science.gov (United States)

    Pathirana, Shan; Abeygunawardane, Saranga Kumudu

    2018-02-01

    In this paper, a probabilistic maintenance model is developed for inspection based preventive maintenance of diesel engines based on the practical model concepts discussed in the literature. Developed model is solved using real data obtained from inspection and maintenance histories of diesel engines and experts' views. Reliability indices and costs were calculated for the present maintenance policy of diesel engines. A sensitivity analysis is conducted to observe the effect of inspection based preventive maintenance on the life cycle cost of diesel engines.

  2. An Optimal Number-Dependent Preventive Maintenance Strategy for Offshore Wind Turbine Blades Considering Logistics

    Directory of Open Access Journals (Sweden)

    Mahmood Shafiee

    2013-01-01

    Full Text Available In offshore wind turbines, the blades are among the most critical and expensive components that suffer from different types of damage due to the harsh maritime environment and high load. The blade damages can be categorized into two types: the minor damage, which only causes a loss in wind capture without resulting in any turbine stoppage, and the major (catastrophic damage, which stops the wind turbine and can only be corrected by replacement. In this paper, we propose an optimal number-dependent preventive maintenance (NDPM strategy, in which a maintenance team is transported with an ordinary or expedited lead time to the offshore platform at the occurrence of the Nth minor damage or the first major damage, whichever comes first. The long-run expected cost of the maintenance strategy is derived, and the necessary conditions for an optimal solution are obtained. Finally, the proposed model is tested on real data collected from an offshore wind farm database. Also, a sensitivity analysis is conducted in order to evaluate the effect of changes in the model parameters on the optimal solution.

  3. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  4. Component-Based Data-Driven Predictive Maintenance to Reduce Unscheduled Maintenance Events

    NARCIS (Netherlands)

    Verhagen, W.J.C.; Curran, R.; de Boer, L.W.M.; Chen, C.H.; Trappey, A.C.; Peruzzini, M.; Stjepandić, J.; Wognum, N.

    2017-01-01

    Costs associated with unscheduled and preventive maintenance can contribute significantly to an airline's expenditure. Reliability analysis can help to identify and plan for maintenance events. Reliability analysis in industry is often limited to statistically based

  5. Periodontal and periimplant maintenance: a critical factor in long-term treatment success.

    Science.gov (United States)

    Shumaker, Nicholas D; Metcalf, Brett T; Toscano, Nicholas T; Holtzclaw, Dan J

    2009-09-01

    Periodontal maintenance (PM) is a critical factor in the long-term success of both periodontal and dental implant therapy. Studies have shown both modern periodontal and dental implant therapies are effective in maintaining natural teeth and replacing lost teeth, respectively. However, without a regular program of clinical reevaluation, plaque control, oral hygiene instruction, and reassessment of biomechanical factors, the benefits of treatment often are lost and inflammatory disease in the form of recurrent periodontitis or periimplantitis may result. This article reviews the goals, types, and appropriate frequency of PM in periodontal and dental implant therapy, as well as the incidence and etiology of periimplant disease and strategies for management when recurrent disease develops during the maintenance phase of treatment.

  6. A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems

    Science.gov (United States)

    Moghaddam, Kamran S.; Usher, John S.

    2011-07-01

    In this article, a new multi-objective optimization model is developed to determine the optimal preventive maintenance and replacement schedules in a repairable and maintainable multi-component system. In this model, the planning horizon is divided into discrete and equally-sized periods in which three possible actions must be planned for each component, namely maintenance, replacement, or do nothing. The objective is to determine a plan of actions for each component in the system while minimizing the total cost and maximizing overall system reliability simultaneously over the planning horizon. Because of the complexity, combinatorial and highly nonlinear structure of the mathematical model, two metaheuristic solution methods, generational genetic algorithm, and a simulated annealing are applied to tackle the problem. The Pareto optimal solutions that provide good tradeoffs between the total cost and the overall reliability of the system can be obtained by the solution approach. Such a modeling approach should be useful for maintenance planners and engineers tasked with the problem of developing recommended maintenance plans for complex systems of components.

  7. Study on the methodology for predicting and preventing errors to improve reliability of maintenance task in nuclear power plant

    International Nuclear Information System (INIS)

    Hanafusa, Hidemitsu; Iwaki, Toshio; Embrey, D.

    2000-01-01

    The objective of this study was to develop and effective methodology for predicting and preventing errors in nuclear power plant maintenance tasks. A method was established by which chief maintenance personnel can predict and reduce errors when reviewing the maintenance procedures and while referring to maintenance supporting systems and methods in other industries including aviation and chemical plant industries. The method involves the following seven steps: 1. Identification of maintenance tasks. 2. Specification of important tasks affecting safety. 3. Assessment of human errors occurring during important tasks. 4. Identification of Performance Degrading Factors. 5. Dividing important tasks into sub-tasks. 6. Extraction of errors using Predictive Human Error Analysis (PHEA). 7. Development of strategies for reducing errors and for recovering from errors. By way of a trial, this method was applied to the pump maintenance procedure in nuclear power plants. This method is believed to be capable of identifying the expected errors in important tasks and supporting the development of error reduction measures. By applying this method, the number of accidents resulting form human errors during maintenance can be reduced. Moreover, the maintenance support base using computers was developed. (author)

  8. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  9. Effectiveness and cost-effectiveness of mindfulness-based cognitive therapy compared with maintenance antidepressant treatment in the prevention of depressive relapse or recurrence (PREVENT): a randomised controlled trial.

    Science.gov (United States)

    Kuyken, Willem; Hayes, Rachel; Barrett, Barbara; Byng, Richard; Dalgleish, Tim; Kessler, David; Lewis, Glyn; Watkins, Edward; Brejcha, Claire; Cardy, Jessica; Causley, Aaron; Cowderoy, Suzanne; Evans, Alison; Gradinger, Felix; Kaur, Surinder; Lanham, Paul; Morant, Nicola; Richards, Jonathan; Shah, Pooja; Sutton, Harry; Vicary, Rachael; Weaver, Alice; Wilks, Jenny; Williams, Matthew; Taylor, Rod S; Byford, Sarah

    2015-07-04

    Individuals with a history of recurrent depression have a high risk of repeated depressive relapse or recurrence. Maintenance antidepressants for at least 2 years is the current recommended treatment, but many individuals are interested in alternatives to medication. Mindfulness-based cognitive therapy (MBCT) has been shown to reduce risk of relapse or recurrence compared with usual care, but has not yet been compared with maintenance antidepressant treatment in a definitive trial. We aimed to see whether MBCT with support to taper or discontinue antidepressant treatment (MBCT-TS) was superior to maintenance antidepressants for prevention of depressive relapse or recurrence over 24 months. In this single-blind, parallel, group randomised controlled trial (PREVENT), we recruited adult patients with three or more previous major depressive episodes and on a therapeutic dose of maintenance antidepressants, from primary care general practices in urban and rural settings in the UK. Participants were randomly assigned to either MBCT-TS or maintenance antidepressants (in a 1:1 ratio) with a computer-generated random number sequence with stratification by centre and symptomatic status. Participants were aware of treatment allocation and research assessors were masked to treatment allocation. The primary outcome was time to relapse or recurrence of depression, with patients followed up at five separate intervals during the 24-month study period. The primary analysis was based on the principle of intention to treat. The trial is registered with Current Controlled Trials, ISRCTN26666654. Between March 23, 2010, and Oct 21, 2011, we assessed 2188 participants for eligibility and recruited 424 patients from 95 general practices. 212 patients were randomly assigned to MBCT-TS and 212 to maintenance antidepressants. The time to relapse or recurrence of depression did not differ between MBCT-TS and maintenance antidepressants over 24 months (hazard ratio 0·89, 95% CI 0·67-1·18

  10. Maintenance of radiation monitoring systems

    International Nuclear Information System (INIS)

    Aoyama, Kei

    2001-01-01

    As the safety and quality of atomic power facilities are more strongly required, the reliability improvement and preventive maintenance of radiation monitoring systems are important. This paper describes the maintenance of radiation monitoring systems delivered by Fuji Electric and the present status of preventive maintenance technology. Also it introduces the case that we developed a fault diagnosis function adopting a statistics technique and artificial intelligence (AI) and delivered a radiation monitoring system including this function. This system can output a fault analysis result and a countermeasure from the computer in real time. (author)

  11. Performance evaluation of multi-state degraded systems with minimal repairs and imperfect preventive maintenance

    International Nuclear Information System (INIS)

    Soro, Isaac W.; Nourelfath, Mustapha; Ait-Kadi, Daoud

    2010-01-01

    In this paper, we develop a model for evaluating the availability, the production rate and the reliability function of multi-state degraded systems subjected to minimal repairs and imperfect preventive maintenance. The status of the system is considered to degrade with use. These degradations may lead to decrease in the system efficiency. It is assumed that the system can consecutively degrade into several discrete states, which are characterized by different performance rates, ranging from perfect functioning to complete failure. The latter is observed when the degradation level reaches a certain critical threshold such as the system efficiency may decrease to an unacceptable limit. In addition, the system can fail randomly from any operational or acceptable state and can be repaired. This repair action brings the system to its previous operational state without affecting its failure rate (i.e., minimal repair). The used preventive maintenance policy suggests that if the system reaches the last acceptable degraded state, it is brought back to one of the states with higher efficiency. Considering customer demand as constant, the system is modeled as a continuous-time Markov process to assess its instantaneous and stationary performance measures. A numerical example is given to illustrate the proposed model.

  12. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  13. Winter mass concentrations of carbon species in PM10, PM 2.5 and PM1 in Zagreb air, Croatia.

    Science.gov (United States)

    Godec, Ranka; Čačković, Mirjana; Šega, Krešimir; Bešlić, Ivan

    2012-11-01

    The purpose of our investigation was to examine the mass concentrations of EC, OC and TC (EC + OC) in PM(10), PM(2.5) and PM(1) particle fractions. Daily PM(10), PM(2.5) and PM(1) samples were collected at an urban background monitoring site in Zagreb during winter 2009. Average OC and EC mass concentrations were 11.9 and 1.8 μg m(-3) in PM(10), 9.0 and 1.4 μg m(-3) in PM(2.5), and 5.5 and 1.1 μg m(-3) in PM(1). Average OC/EC ratios in PM(10), PM(2.5), and PM(1) were 7.4, 6.9 and 5.4, respectively.

  14. Measurements of the branching fractions and $C\\!P$ asymmetries of $B^{\\pm} \\to J\\!/\\!\\psi\\, \\pi^{\\pm}$ and $B^{\\pm} \\to \\psi(2S) \\pi^{\\pm}$ decays

    CERN Document Server

    Aaij, R; Adeva, B; Adinolfi, M; Adrover, C; Affolder, A; Ajaltouni, Z; Albrecht, J; Alessio, F; Alexander, M; Ali, S; Alkhazov, G; Alvarez Cartelle, P; Alves Jr, A A; Amato, S; Amhis, Y; Anderson, J; Appleby, R B; Aquines Gutierrez, O; Archilli, F; Artamonov, A; Artuso, M; Aslanides, E; Auriemma, G; Bachmann, S; Back, J J; Balagura, V; Baldini, W; Barlow, R J; Barschel, C; Barsuk, S; Barter, W; Bates, A; Bauer, C; Bauer, Th; Bay, A; Bediaga, I; Belogurov, S; Belous, K; Belyaev, I; Ben-Haim, E; Benayoun, M; Bencivenni, G; Benson, S; Benton, J; Bernet, R; Bettler, M-O; van Beuzekom, M; Bien, A; Bifani, S; Bird, T; Bizzeti, A; Bjørnstad, P M; Blake, T; Blanc, F; Blanks, C; Blouw, J; Blusk, S; Bobrov, A; Bocci, V; Bondar, A; Bondar, N; Bonivento, W; Borghi, S; Borgia, A; Bowcock, T J V; Bozzi, C; Brambach, T; van den Brand, J; Bressieux, J; Brett, D; Britsch, M; Britton, T; Brook, N H; Brown, H; Büchler-Germann, A; Burducea, I; Bursche, A; Buytaert, J; Cadeddu, S; Callot, O; Calvi, M; Calvo Gomez, M; Camboni, A; Campana, P; Carbone, A; Carboni, G; Cardinale, R; Cardini, A; Carson, L; Carvalho Akiba, K; Casse, G; Cattaneo, M; Cauet, Ch; Charles, M; Charpentier, Ph; Chiapolini, N; Ciba, K; Cid Vidal, X; Ciezarek, G; Clarke, P E L; Clemencic, M; Cliff, H V; Closier, J; Coca, C; Coco, V; Cogan, J; Collins, P; Comerma-Montells, A; Contu, A; Cook, A; Coombes, M; Corti, G; Couturier, B; Cowan, G A; Currie, R; D'Ambrosio, C; David, P; David, P N Y; De Bonis, I; De Bruyn, K; De Capua, S; De Cian, M; De Miranda, J M; De Paula, L; De Simone, P; Decamp, D; Deckenhoff, M; Degaudenzi, H; Del Buono, L; Deplano, C; Derkach, D; Deschamps, O; Dettori, F; Dickens, J; Dijkstra, H; Diniz Batista, P; Domingo Bonal, F; Donleavy, S; Dordei, F; Dosil Suárez, A; Dossett, D; Dovbnya, A; Dupertuis, F; Dzhelyadin, R; Dziurda, A; Easo, S; Egede, U; Egorychev, V; Eidelman, S; van Eijk, D; Eisele, F; Eisenhardt, S; Ekelhof, R; Eklund, L; Elsasser, Ch; Elsby, D; Esperante Pereira, D; Falabella, A; Färber, C; Fardell, G; Farinelli, C; Farry, S; Fave, V; Fernandez Albor, V; Ferro-Luzzi, M; Filippov, S; Fitzpatrick, C; Fontana, M; Fontanelli, F; Forty, R; Francisco, O; Frank, M; Frei, C; Frosini, M; Furcas, S; Gallas Torreira, A; Galli, D; Gandelman, M; Gandini, P; Gao, Y; Garnier, J-C; Garofoli, J; Garra Tico, J; Garrido, L; Gascon, D; Gaspar, C; Gauld, R; Gauvin, N; Gersabeck, M; Gershon, T; Ghez, Ph; Gibson, V; Gligorov, V V; Göbel, C; Golubkov, D; Golutvin, A; Gomes, A; Gordon, H; Grabalosa Gándara, M; Graciani Diaz, R; Granado Cardoso, L A; Graugés, E; Graziani, G; Grecu, A; Greening, E; Gregson, S; Gui, B; Gushchin, E; Guz, Yu; Gys, T; Hadjivasiliou, C; Haefeli, G; Haen, C; Haines, S C; Hampson, T; Hansmann-Menzemer, S; Harji, R; Harnew, N; Harrison, J; Harrison, P F; Hartmann, T; He, J; Heijne, V; Hennessy, K; Henrard, P; Hernando Morata, J A; van Herwijnen, E; Hicks, E; Holubyev, K; Hopchev, P; Hulsbergen, W; Hunt, P; Huse, T; Huston, R S; Hutchcroft, D; Hynds, D; Iakovenko, V; Ilten, P; Imong, J; Jacobsson, R; Jaeger, A; Jahjah Hussein, M; Jans, E; Jansen, F; Jaton, P; Jean-Marie, B; Jing, F; John, M; Johnson, D; Jones, C R; Jost, B; Kaballo, M; Kandybei, S; Karacson, M; Karbach, T M; Keaveney, J; Kenyon, I R; Kerzel, U; Ketel, T; Keune, A; Khanji, B; Kim, Y M; Knecht, M; Koopman, R F; Koppenburg, P; Korolev, M; Kozlinskiy, A; Kravchuk, L; Kreplin, K; Kreps, M; Krocker, G; Krokovny, P; Kruse, F; Kruzelecki, K; Kucharczyk, M; Kudryavtsev, V; Kvaratskheliya, T; La Thi, V N; Lacarrere, D; Lafferty, G; Lai, A; Lambert, D; Lambert, R W; Lanciotti, E; Lanfranchi, G; Langenbruch, C; Latham, T; Lazzeroni, C; Le Gac, R; van Leerdam, J; Lees, J-P; Lefèvre, R; Leflat, A; Lefrançois, J; Leroy, O; Lesiak, T; Li, L; Li Gioi, L; Lieng, M; Liles, M; Lindner, R; Linn, C; Liu, B; Liu, G; von Loeben, J; Lopes, J H; Lopez Asamar, E; Lopez-March, N; Lu, H; Luisier, J; Mac Raighne, A; Machefert, F; Machikhiliyan, I V; Maciuc, F; Maev, O; Magnin, J; Malde, S; Mamunur, R M D; Manca, G; Mancinelli, G; Mangiafave, N; Marconi, U; Märki, R; Marks, J; Martellotti, G; Martens, A; Martin, L; Martín Sánchez, A; Martinelli, M; Martinez Santos, D; Massafferri, A; Mathe, Z; Matteuzzi, C; Matveev, M; Maurice, E; Maynard, B; Mazurov, A; McGregor, G; McNulty, R; Meissner, M; Merk, M; Merkel, J; Miglioranzi, S; Milanes, D A; Minard, M-N; Molina Rodriguez, J; Monteil, S; Moran, D; Morawski, P; Mountain, R; Mous, I; Muheim, F; Müller, K; Muresan, R; Muryn, B; Muster, B; Mylroie-Smith, J; Naik, P; Nakada, T; Nandakumar, R; Nasteva, I; Needham, M; Neufeld, N; Nguyen, A D; Nguyen-Mau, C; Nicol, M; Niess, V; Nikitin, N; Nikodem, T; Nomerotski, A; Novoselov, A; Oblakowska-Mucha, A; Obraztsov, V; Oggero, S; Ogilvy, S; Okhrimenko, O; Oldeman, R; Orlandea, M; Otalora Goicochea, J M; Owen, P; Pal, B K; Palacios, J; Palano, A; Palutan, M; Panman, J; Papanestis, A; Pappagallo, M; Parkes, C; Parkinson, C J; Passaleva, G; Patel, G D; Patel, M; Paterson, S K; Patrick, G N; Patrignani, C; Pavel-Nicorescu, C; Pazos Alvarez, A; Pellegrino, A; Penso, G; Pepe Altarelli, M; Perazzini, S; Perego, D L; Perez Trigo, E; Pérez-Calero Yzquierdo, A; Perret, P; Perrin-Terrin, M; Pessina, G; Petrolini, A; Phan, A; Picatoste Olloqui, E; Pie Valls, B; Pietrzyk, B; Pilař, T; Pinci, D; Plackett, R; Playfer, S; Plo Casasus, M; Polok, G; Poluektov, A; Polycarpo, E; Popov, D; Popovici, B; Potterat, C; Powell, A; Prisciandaro, J; Pugatch, V; Puig Navarro, A; Qian, W; Rademacker, J H; Rakotomiaramanana, B; Rangel, M S; Raniuk, I; Raven, G; Redford, S; Reid, M M; dos Reis, A C; Ricciardi, S; Richards, A; Rinnert, K; Roa Romero, D A; Robbe, P; Rodrigues, E; Rodrigues, F; Rodriguez Perez, P; Rogers, G J; Roiser, S; Romanovsky, V; Rosello, M; Rouvinet, J; Ruf, T; Ruiz, H; Sabatino, G; Saborido Silva, J J; Sagidova, N; Sail, P; Saitta, B; Salzmann, C; Sannino, M; Santacesaria, R; Santamarina Rios, C; Santinelli, R; Santovetti, E; Sapunov, M; Sarti, A; Satriano, C; Satta, A; Savrie, M; Savrina, D; Schaack, P; Schiller, M; Schindler, H; Schleich, S; Schlupp, M; Schmelling, M; Schmidt, B; Schneider, O; Schopper, A; Schune, M-H; Schwemmer, R; Sciascia, B; Sciubba, A; Seco, M; Semennikov, A; Senderowska, K; Sepp, I; Serra, N; Serrano, J; Seyfert, P; Shapkin, M; Shapoval, I; Shatalov, P; Shcheglov, Y; Shears, T; Shekhtman, L; Shevchenko, O; Shevchenko, V; Shires, A; Silva Coutinho, R; Skwarnicki, T; Smith, N A; Smith, E; Sobczak, K; Soler, F J P; Solomin, A; Soomro, F; Souza De Paula, B; Spaan, B; Sparkes, A; Spradlin, P; Stagni, F; Stahl, S; Steinkamp, O; Stoica, S; Stone, S; Storaci, B; Straticiuc, M; Straumann, U; Subbiah, V K; Swientek, S; Szczekowski, M; Szczypka, P; Szumlak, T; T'Jampens, S; Teodorescu, E; Teubert, F; Thomas, C; Thomas, E; van Tilburg, J; Tisserand, V; Tobin, M; Tolk, S; Topp-Joergensen, S; Torr, N; Tournefier, E; Tourneur, S; Tran, M T; Tsaregorodtsev, A; Tuning, N; Ubeda Garcia, M; Ukleja, A; Uwer, U; Vagnoni, V; Valenti, G; Vazquez Gomez, R; Vazquez Regueiro, P; Vecchi, S; Velthuis, J J; Veltri, M; Viaud, B; Videau, I; Vieira, D; Vilasis-Cardona, X; Visniakov, J; Vollhardt, A; Volyanskyy, D; Voong, D; Vorobyev, A; Vorobyev, V; Voss, H; Waldi, R; Wandernoth, S; Wang, J; Ward, D R; Watson, N K; Webber, A D; Websdale, D; Whitehead, M; Wiedner, D; Wiggers, L; Wilkinson, G; Williams, M P; Williams, M; Wilson, F F; Wishahi, J; Witek, M; Witzeling, W; Wotton, S A; Wyllie, K; Xie, Y; Xing, F; Xing, Z; Yang, Z; Young, R; Yushchenko, O; Zangoli, M; Zavertyaev, M; Zhang, F; Zhang, L; Zhang, W C; Zhang, Y; Zhelezov, A; Zhong, L; Zvyagin, A

    2012-01-01

    A study of $B^{\\pm} \\to J\\!/\\!\\psi\\, \\pi^{\\pm}$ and $B^{\\pm} \\to \\psi(2S) \\pi^{\\pm}$ decays is performed with data corresponding to $0.37\\,{\\rm fb}^{-1}$ of proton-proton collisions at $\\sqrt{s}=7\\,\\mathrm{Te\\kern -0.1em V}$. Their branching fractions are found to be \\begin{eqnarray*} \\mathcal{B}(B^{\\pm} \\to J\\!/\\!\\psi\\, \\pi^{\\pm}) &=& (3.88 \\pm 0.11 \\pm 0.15) \\times 10^{-5}\\ {\\rm and}\\\\ \\mathcal{B}(B^{\\pm} \\to \\psi(2S) \\pi^{\\pm}) &=& (2.52 \\pm 0.26 \\pm 0.15) \\times 10^{-5}, \\end{eqnarray*} where the first uncertainty is related to the statistical size of the sample and the second quantifies systematic effects. The measured $C\\!P$ asymmetries in these modes are \\begin{eqnarray*} A_{CP}^{J\\!/\\!\\psi\\, \\pi} &=& 0.005 \\pm 0.027 \\pm 0.011\\ {\\rm and} \\\\ A_{CP}^{\\psi(2S) \\pi} &=& 0.048 \\pm 0.090 \\pm 0.011 \\end{eqnarray*} with no evidence of direct $C\\!P$ violation seen.

  15. 76 FR 72404 - Adequacy Status of Motor Vehicle Emissions Budgets in Submitted PM10

    Science.gov (United States)

    2011-11-23

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9495-4] Adequacy Status of Motor Vehicle Emissions Budgets in Submitted PM 10 Maintenance Plan for Sacramento County; CA AGENCY: Environmental Protection Agency (EPA... found that the motor vehicle emissions budgets (MVEBs) for particulate matter with an aerodynamic...

  16. A Biochemical Approach to Understanding the Fanconi Anemia Pathway-Regulated Nucleases in Genome Maintenance for Preventing Bone Marrow Failure and Cancer

    Science.gov (United States)

    2014-04-01

    the Fanconi Anemia Pathway- Regulated Nucleases in Genome Maintenance for Preventing Bone Marrow Failure and Cancer PRINCIPAL INVESTIGATOR...GRANT NUMBER 4. TITLE AND SUBTITLE A Biochemical Approach to Understanding the Fanconi Anemia Pathway-Regulated Nucleases in Genome Maintenance for...Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT Fanconi anemia is the most prevalent inherited BMF syndromes, caused by mutations in

  17. The impact of the "Air Pollution Prevention and Control Action Plan" on PM2.5 concentrations in Jing-Jin-Ji region during 2012-2020.

    Science.gov (United States)

    Cai, Siyi; Wang, Yangjun; Zhao, Bin; Wang, Shuxiao; Chang, Xing; Hao, Jiming

    2017-02-15

    In order to cope with heavy haze pollution in China, the Air Pollution Prevention and Control Action Plan including phased goals of the fine particulate matter (PM 2.5 ) was issued in 2013. In this study, China's emission inventories in the baseline 2012 and the future scenarios of 2017 and 2020 have been developed based on this Action Plan. Beijing-Tianjin-Hebei (Jing-Jin-Ji) region, one of the most polluted regions in China, was taken as a case to assess the impact of phased emission control measures on PM 2.5 concentration reduction using WRF-CMAQ model system. With the implementation of the Action Plan, the emissions of sulfur dioxide (SO 2 ), nitrogen oxides (NO X ) , PM 2.5 , non-methane volatile organic compound (NMVOC), and ammonia (NH 3 ) in 2017 will decrease by36%, 31%, 30%,12%, and -10% from the 2012 levels in Jing-Jin-Ji, respectively. In 2020, the emissions of SO 2 , NO X, PM 2.5 , NMVOC, and NH 3 will decrease by 40%, 44%, 40%, 22%, and -3% from the 2012 levels in Jing-Jin-Ji, respectively. Consequently, the ambient annual PM 2.5 concentration under the scenarios of 2017 and 2020 will be 28.3% and 37.8% lower than those in 2012, respectively. The Action Plan provided an effective approach to alleviate PM 2.5 pollution level in Jing-Jin-Ji region. However, emission control of NMVOC and NH 3 should be paid more attention and be strengthened in future. Meanwhile, emission control of NO x , SO 2 , NH 3 and NMVOC synergistically are highly needed in the future because multiple pollutants impact on PM 2.5 and O 3 concentrations nonlinearly. Copyright © 2016 Elsevier B.V. All rights reserved.

  18. Maintenance work on CERN mobile phone services

    CERN Multimedia

    2007-01-01

    Maintenance work on the CERN GSM services will be carried out by our mobile operator, Sunrise, from 8.00 p.m. on 25 June to 1 a.m. on 26 June. External calls from CERN mobile phones using the 333 prefix may be disrupted for 30 minutes during this time. Other type of calls, e.g. mobile to mobile or mobile to CERN fixed phones, will not be affected. Should you have any questions regarding this maintenance operation, please contact the switchboard by phone (76111) or e-mail (standard.telephone@cern.ch) Telecom Section IT/CS

  19. Exposure of bakery and pastry apprentices to airborne flour dust using PM2.5 and PM10 personal samplers

    Directory of Open Access Journals (Sweden)

    Paris Christophe

    2007-11-01

    Full Text Available Abstract Background This study describes exposure levels of bakery and pastry apprentices to flour dust, a known risk factor of occupational asthma. Methods Questionnaires on work activity were completed by 286 students. Among them, 34 performed a series of two personal exposure measurements using a PM2.5 and PM10 personal sampler during a complete work shift, one during a cold ("winter" period, and the other during a hot ("summer" period. Results Bakery apprentices experience greater average PM2.5 and PM10 exposures than pastry apprentices (p 10 values among bakers = 1.10 mg.m-3 [standard deviation: 0.83] than in summer (0.63 mg.m-3 [0.36]. While complying with current European occupational limit values, these exposures exceed the ACGIH recommendations set to prevent sensitization to flour dust (0.5 mg.m-3. Over half the facilities had no ventilation system. Conclusion Young bakery apprentices incur substantial exposure to known airways allergens, a situation that might elicit early induction of airways inflammation.

  20. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    TS Department

    2008-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 3 December. During this time, the fixed-line telephone and audio-conference services may be disrupted. However, the CCC and the Fire Brigade will be reachable at all times. Mobile telephone services (GSM) will not be affected by this work. For further details please contact mailto:Netops@cern.ch.

  1. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    TS Department

    2008-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 3 December. During this time, the fixed-line telephone and audio-conference services may be disrupted. However, the CCC and the Fire Brigade will be reachable at all times. Mobile telephone services (GSM) will not be affected by this work. For further details please contact Netops@cern.ch.

  2. Jointly Production and Correlated Maintenance Optimization for Parallel Leased Machines

    Directory of Open Access Journals (Sweden)

    Tarek ASKRI

    2017-04-01

    Full Text Available This paper deals with a preventive maintenance strategy optimization correlated to production for a manufacturing system made by several parallel machines under lease contract. In order to minimize the total cost of production and maintenance by reducing the production system interruptions due to maintenance activities, a correlated group preventive maintenance policy is developed using the gravity center approach (GCA. The aim of this study is to determine an economical production plan and an optimal group preventive maintenance interval Tn at which all machines are maintained simultaneously. An analytical correlation between failure rate of machines and production level is considered and the impact of the preventive maintenance policy on the production plan is studied. Finally, the proposed maintenance policy GPM is compared with an individual simple strategy approach IPM in order to illustrate its efficiency.

  3. Prototype road weather performance management (RW-PM) tool and Minnesota Department of Transportation (MnDOT) field evaluation.

    Science.gov (United States)

    2017-01-01

    FHWAs Road Weather Management Program developed : a Prototype Road Weather Management (RW-PM) Tool : to help DOTs maximize the effectiveness of their maintenance : resources and efficiently adjust deployments dynamically, : as road conditions and ...

  4. Search for direct CP violating charge asymmetries in $K^\\pm\\to\\pi^\\pm\\pi^+\\pi^-$ and $K^\\pm\\to\\pi^\\pm\\pi^0\\pi^0$ decays

    CERN Document Server

    Batley, J Richard; Kalmus, George Ernest; Lazzeroni, C; Munday, D J; Slater, M W; Wotton, S A; Arcidiacono, R; Bocquet, G; Cabibbo, Nicola; Ceccucci, A; Cundy, Donald C; Falaleev, V; Fidecaro, Maria; Gatignon, L; Gonidec, A; Kubischta, Werner; Norton, A; Maier, A; Patel, M; Peters, A; Balev, S; Frabetti, P L; Goudzovski, E; Khristov, P Z; Kekelidze, V D; Kozhuharov, V; Litov, L; Madigozhin, D T; Marinova, E; Molokanova, N A; Polenkevich, I; Potrebenikov, Yu K; Stoynev, S; Zinchenko, A I; Monnier, E; Swallow, E; Winston, R; Rubin, P; Walker, A; Baldini, W; Cotta-Ramusino, A; Dalpiaz, P; Damiani, C; Fiorini, M; Gianoli, A; Martini, M; Petrucci, F; Savrié, M; Scarpa, M; Wahle, H; Bizzeti, A; Calvetti, M; Celeghini, E; Iacopini, E; Lenti, M; Martelli, F; Ruggiero, G; Veltri, M; Behler, M; Eppard, K; Kleinknecht, K; Marouelli, P; Masetti, L; Moosbrugger, U; Morales-Morales, C; Renk, B; Wache, M; Wanke, R; Winhart, A; Coward, D; Dabrowski, A; Fonseca-Martin, T; Shieh, M; Szleper, M; Velasco, M; Wood, M D; Anzivino, Giuseppina; Cenci, P; Imbergamo, E; Nappi, A; Pepé, M; Petrucci, M C; Piccini, M; Raggi, M; Valdata-Nappi, M; Cerri, C; Collazuol, G; Costantini, F; Di Lella, L; Doble, N; Fantechi, R; Fiorini, L; Giudici, S; Lamanna, G; Mannelli, I; Michetti, A; Pierazzini, G M; Sozzi, M; Bloch-Devaux, B; Cheshkov, C; Chèze, J B; De Beer, M; Derré, J; Marel, Gérard; Mazzucato, E; Peyaud, B; Vallage, B; Holder, M; Ziolkowski, M; Bifani, S; Biino, C; Cartiglia, N; Clemencic, M; Goy-Lopez, S; Marchetto, F; Dibon, Heinz; Jeitler, Manfred; Markytan, Manfred; Mikulec, I; Neuhofer, G; Widhalm, L

    2007-01-01

    A measurement of the direct CP violating charge asymmetries of the Dalitz plot linear slopes $A_g=(g^+-g^-)/(g^++g^-)$ in $K^\\pm\\to\\pi^\\pm\\pi^+\\pi^-$ and $K^\\pm\\to\\pi^\\pm\\pi^0\\pi^0$ decays by the NA48/2 experiment at CERN SPS is presented. A new technique of asymmetry measurement involving simultaneous $K^+$ and $K^-$ beams and a large data sample collected allowed a result of an unprecedented precision. The charge asymmetries were measured to be $A^c_g=(-1.5\\pm2.1)\\times10^{-4}$ with $3.11\\times 10^9$ $K^{\\pm}\\to\\pi^\\pm\\pi^+\\pi^-$ decays, and $A^n_g=(1.8\\pm1.8)\\times10^{-4}$ with $9.13\\times 10^7$ $K^{\\pm}\\to\\pi^\\pm\\pi^0\\pi^0$ decays. The precision of the results is limited mainly by the size of the data sample.

  5. Laser application maintenance technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Shima, Seishi; Sato, Kenji; Kobayashi, Masahiro; Sano, Yuji; Kimura, Seiichiro

    2000-01-01

    Several plants that were the first to be constructed in Japan have been operating for more than 20 years now, and preventive maintenance is therefore a matter of great importance. This paper summarizes the status of applied laser maintenance technologies both preventive and repair. Especially for the laser peening and laser de-sensitization treatment technology, field applications were also described in detail. In future, expansion of field application area on the preventive maintenance, repair and inspection technologies will be developed. (author)

  6. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    Science.gov (United States)

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm. PMID:24883414

  7. Hybrid Particle Swarm Optimization for Hybrid Flowshop Scheduling Problem with Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Jun-qing Li

    2014-01-01

    Full Text Available A hybrid algorithm which combines particle swarm optimization (PSO and iterated local search (ILS is proposed for solving the hybrid flowshop scheduling (HFS problem with preventive maintenance (PM activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron’s benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm.

  8. Hybrid particle swarm optimization for hybrid flowshop scheduling problem with maintenance activities.

    Science.gov (United States)

    Li, Jun-qing; Pan, Quan-ke; Mao, Kun

    2014-01-01

    A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm.

  9. Collaborative learning in condition based maintenance

    NARCIS (Netherlands)

    Koochaki, J.; Ao, SI; Gelman, L; Hukins, DWL; Hunter, A; Korsunsky, AM

    2009-01-01

    In recent years, the importance of reliable and consistent production equipments has increased. As a result, companies are shifting their maintenance policy from preventive maintenance towards Condition Based Maintenance (CBM). Despite the growing trend in this area and success stories of CBM

  10. The development of training based on the PM leadership theory

    International Nuclear Information System (INIS)

    Yoshida, Michio; Misumi, Jyuji; Yamada, Akira; Misumi, Emiko; Sakurai, Yukihiro; Kinjo, Akira; Matsuda, Ryosuke; Matsuo, Hidehisa; Tokudome, Eiji.

    1995-01-01

    The PM leadership theory developed by Misumi, et al., basically identifies leadership behavior in terms of two dimensions, i.e., P(Performance) behavior and M(Maintenance) behavior, and divides it into four types, PM, M, P and pm, depending on the degree to which each of them performs its behavior. Thus, it has been verified that the differences between these types have an effect on various variables, such as subordinates' morale, productivity and reduced incidence of accidents. To be more concrete, it has been consistently found as a result of a number of studies that what brings about the most desirable results in the eyes of organizations is the PM type, followed by M, P and pm in the order mentioned. The most basic premise for the PM theory is that leadership lies not in the leader's personal traits but in his behavior. Consequently, any leadership type is not 'carved in stone', and it can change according to the leader's behavior. From this, it follows that leadership can be improved and upgraded. As the PM leadership theory has become well-established, the development research and implementation of leadership training aimed at improving and upgrading leadership was launched. In this paper, the leadership training that is now in progress will be discussed, with particular reference to its purpose, current status of its overall progress and its typical training schedule. That done, the history of development of the leadership training will be reviewed, and at the same time, its effects will be examined on the basis of some empirical data. Also some proposals will be presented concerning the relationship between organizational development and training as well as some problems to be addressed in the future. (author)

  11. The development of training based on the PM leadership theory

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, Michio [Kumamoto Univ. (Japan). Faculty of Education; Misumi, Jyuji; Yamada, Akira; Misumi, Emiko; Sakurai, Yukihiro; Kinjo, Akira; Matsuda, Ryosuke; Matsuo, Hidehisa; Tokudome, Eiji

    1995-09-01

    The PM leadership theory developed by Misumi, et al., basically identifies leadership behavior in terms of two dimensions, i.e., P(Performance) behavior and M(Maintenance) behavior, and divides it into four types, PM, M, P and pm, depending on the degree to which each of them performs its behavior. Thus, it has been verified that the differences between these types have an effect on various variables, such as subordinates` morale, productivity and reduced incidence of accidents. To be more concrete, it has been consistently found as a result of a number of studies that what brings about the most desirable results in the eyes of organizations is the PM type, followed by M, P and pm in the order mentioned. The most basic premise for the PM theory is that leadership lies not in the leader`s personal traits but in his behavior. Consequently, any leadership type is not `carved in stone`, and it can change according to the leader`s behavior. From this, it follows that leadership can be improved and upgraded. As the PM leadership theory has become well-established, the development research and implementation of leadership training aimed at improving and upgrading leadership was launched. In this paper, the leadership training that is now in progress will be discussed, with particular reference to its purpose, current status of its overall progress and its typical training schedule. That done, the history of development of the leadership training will be reviewed, and at the same time, its effects will be examined on the basis of some empirical data. Also some proposals will be presented concerning the relationship between organizational development and training as well as some problems to be addressed in the future. (author)

  12. Airline experience with reliability-centered maintenance

    International Nuclear Information System (INIS)

    Matteson, T.D.

    1985-01-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.)

  13. Airline experience with reliability-centered maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Matteson, T.D.

    1985-11-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.).

  14. Maintenance Policy in Public-Transport Involving Government Subsidy

    Science.gov (United States)

    Pasaribu, U. S.; Bayuzetra, Y.; Gunawan, L. E.; Husniah, H.

    2018-02-01

    A public transport with government subsidy is considered to encourage the sustainability of the transportation. The transportations revenue is determined by the maximum of the uptimes of the vehicle. In this paper, we study a one-dimensional maintenance policy for new vehicle which is characterized by age parameter. We consider that the degradation of the vehicle is affected by the age of the vehicle, and modelled by using a one-dimensional approach. The owner performs both preventive and corrective maintenance actions, and the preventive maintenance action will reduce the vehicle failure rate and hence it will decrease the corrective maintenance cost during the life time of the vehicle. The decision problem for the owner is to find the optimal preventive maintenance time of the vehicle of each subsidy option offered by maximizing the expected profit for each subsidy.

  15. Reliability centred maintenance of nuclear power plant facilities

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena; Hlavac, Pavol; Janicek, Frantisek

    2011-01-01

    A method for the optimization of preventive maintenance nuclear power plant equipment, i.e. reliability centred maintenance, is described. The method enables procedures and procedure schedules to be defined such as allow the maintenance cost to be minimized without compromising operational safety or reliability. Also, combinations of facilities which remain available and ensure reliable operation of the reactor unit during the maintenance of other pieces of equipment are identified. The condition-based maintenance concept is used in this process, thereby preventing unnecessary operator interventions into the equipment, which are often associated with human errors. Where probabilistic safety assessment is available, the most important structures, systems and components with the highest maintenance priority can be identified. (orig.)

  16. Observation of $C\\!P$ violation in $B^\\pm \\to D K^\\pm$ decays

    CERN Document Server

    Aaij, R; Adeva, B; Adinolfi, M; Adrover, C; Affolder, A; Ajaltouni, Z; Albrecht, J; Alessio, F; Alexander, M; Ali, S; Alkhazov, G; Alvarez Cartelle, P; Alves Jr, A A; Amato, S; Amhis, Y; Anderson, J; Appleby, R B; Aquines Gutierrez, O; Archilli, F; Artamonov, A; Artuso, M; Aslanides, E; Auriemma, G; Bachmann, S; Back, J J; Balagura, V; Baldini, W; Barlow, R J; Barschel, C; Barsuk, S; Barter, W; Bates, A; Bauer, C; Bauer, Th; Bay, A; Bediaga, I; Belogurov, S; Belous, K; Belyaev, I; Ben-Haim, E; Benayoun, M; Bencivenni, G; Benson, S; Benton, J; Bernet, R; Bettler, M-O; van Beuzekom, M; Bien, A; Bifani, S; Bird, T; Bizzeti, A; Bjørnstad, P M; Blake, T; Blanc, F; Blanks, C; Blouw, J; Blusk, S; Bobrov, A; Bocci, V; Bondar, A; Bondar, N; Bonivento, W; Borghi, S; Borgia, A; Bowcock, T J V; Bozzi, C; Brambach, T; van den Brand, J; Bressieux, J; Brett, D; Britsch, M; Britton, T; Brook, N H; Brown, H; Büchler-Germann, A; Burducea, I; Bursche, A; Buytaert, J; Cadeddu, S; Callot, O; Calvi, M; Calvo Gomez, M; Camboni, A; Campana, P; Carbone, A; Carboni, G; Cardinale, R; Cardini, A; Carson, L; Carvalho Akiba, K; Casse, G; Cattaneo, M; Cauet, Ch; Charles, M; Charpentier, Ph; Chiapolini, N; Ciba, K; Cid Vidal, X; Ciezarek, G; Clarke, P E L; Clemencic, M; Cliff, H V; Closier, J; Coca, C; Coco, V; Cogan, J; Collins, P; Comerma-Montells, A; Contu, A; Cook, A; Coombes, M; Corti, G; Couturier, B; Cowan, G A; Currie, R; D'Ambrosio, C; David, P; David, P N Y; De Bonis, I; De Bruyn, K; De Capua, S; De Cian, M; De Miranda, J M; De Paula, L; De Simone, P; Decamp, D; Deckenhoff, M; Degaudenzi, H; Del Buono, L; Deplano, C; Derkach, D; Deschamps, O; Dettori, F; Dickens, J; Dijkstra, H; Diniz Batista, P; Domingo Bonal, F; Donleavy, S; Dordei, F; Dosil Suárez, A; Dossett, D; Dovbnya, A; Dupertuis, F; Dzhelyadin, R; Dziurda, A; Easo, S; Egede, U; Egorychev, V; Eidelman, S; van Eijk, D; Eisele, F; Eisenhardt, S; Ekelhof, R; Eklund, L; Elsasser, Ch; Elsby, D; Esperante Pereira, D; Falabella, A; Färber, C; Fardell, G; Farinelli, C; Farry, S; Fave, V; Fernandez Albor, V; Ferro-Luzzi, M; Filippov, S; Fitzpatrick, C; Fontana, M; Fontanelli, F; Forty, R; Francisco, O; Frank, M; Frei, C; Frosini, M; Furcas, S; Gallas Torreira, A; Galli, D; Gandelman, M; Gandini, P; Gao, Y; Garnier, J-C; Garofoli, J; Garra Tico, J; Garrido, L; Gascon, D; Gaspar, C; Gauld, R; Gauvin, N; Gersabeck, M; Gershon, T; Ghez, Ph; Gibson, V; Gligorov, V V; Göbel, C; Golubkov, D; Golutvin, A; Gomes, A; Gordon, H; Grabalosa Gándara, M; Graciani Diaz, R; Granado Cardoso, L A; Graugés, E; Graziani, G; Grecu, A; Greening, E; Gregson, S; Gui, B; Gushchin, E; Guz, Yu; Gys, T; Hadjivasiliou, C; Haefeli, G; Haen, C; Haines, S C; Hampson, T; Hansmann-Menzemer, S; Harji, R; Harnew, N; Harrison, J; Harrison, P F; Hartmann, T; He, J; Heijne, V; Hennessy, K; Henrard, P; Hernando Morata, J A; van Herwijnen, E; Hicks, E; Holubyev, K; Hopchev, P; Hulsbergen, W; Hunt, P; Huse, T; Huston, R S; Hutchcroft, D; Hynds, D; Iakovenko, V; Ilten, P; Imong, J; Jacobsson, R; Jaeger, A; Jahjah Hussein, M; Jans, E; Jansen, F; Jaton, P; Jean-Marie, B; Jing, F; John, M; Johnson, D; Jones, C R; Jost, B; Kaballo, M; Kandybei, S; Karacson, M; Karbach, T M; Keaveney, J; Kenyon, I R; Kerzel, U; Ketel, T; Keune, A; Khanji, B; Kim, Y M; Knecht, M; Koopman, R F; Koppenburg, P; Korolev, M; Kozlinskiy, A; Kravchuk, L; Kreplin, K; Kreps, M; Krocker, G; Krokovny, P; Kruse, F; Kruzelecki, K; Kucharczyk, M; Kudryavtsev, V; Kvaratskheliya, T; La Thi, V N; Lacarrere, D; Lafferty, G; Lai, A; Lambert, D; Lambert, R W; Lanciotti, E; Lanfranchi, G; Langenbruch, C; Latham, T; Lazzeroni, C; Le Gac, R; van Leerdam, J; Lees, J-P; Lefèvre, R; Leflat, A; Lefrançois, J; Leroy, O; Lesiak, T; Li, L; Li Gioi, L; Lieng, M; Liles, M; Lindner, R; Linn, C; Liu, B; Liu, G; von Loeben, J; Lopes, J H; Lopez Asamar, E; Lopez-March, N; Lu, H; Luisier, J; Mac Raighne, A; Machefert, F; Machikhiliyan, I V; Maciuc, F; Maev, O; Magnin, J; Malde, S; Mamunur, R M D; Manca, G; Mancinelli, G; Mangiafave, N; Marconi, U; Märki, R; Marks, J; Martellotti, G; Martens, A; Martin, L; Martín Sánchez, A; Martinelli, M; Martinez Santos, D; Massafferri, A; Mathe, Z; Matteuzzi, C; Matveev, M; Maurice, E; Maynard, B; Mazurov, A; McGregor, G; McNulty, R; Meissner, M; Merk, M; Merkel, J; Miglioranzi, S; Milanes, D A; Minard, M-N; Molina Rodriguez, J; Monteil, S; Moran, D; Morawski, P; Mountain, R; Mous, I; Muheim, F; Müller, K; Muresan, R; Muryn, B; Muster, B; Mylroie-Smith, J; Naik, P; Nakada, T; Nandakumar, R; Nasteva, I; Needham, M; Neufeld, N; Nguyen, A D; Nguyen-Mau, C; Nicol, M; Niess, V; Nikitin, N; Nikodem, T; Nomerotski, A; Novoselov, A; Oblakowska-Mucha, A; Obraztsov, V; Oggero, S; Ogilvy, S; Okhrimenko, O; Oldeman, R; Orlandea, M; Otalora Goicochea, J M; Owen, P; Pal, B K; Palacios, J; Palano, A; Palutan, M; Panman, J; Papanestis, A; Pappagallo, M; Parkes, C; Parkinson, C J; Passaleva, G; Patel, G D; Patel, M; Paterson, S K; Patrick, G N; Patrignani, C; Pavel-Nicorescu, C; Pazos Alvarez, A; Pellegrino, A; Penso, G; Pepe Altarelli, M; Perazzini, S; Perego, D L; Perez Trigo, E; Pérez-Calero Yzquierdo, A; Perret, P; Perrin-Terrin, M; Pessina, G; Petrolini, A; Phan, A; Picatoste Olloqui, E; Pie Valls, B; Pietrzyk, B; Pilař, T; Pinci, D; Plackett, R; Playfer, S; Plo Casasus, M; Polok, G; Poluektov, A; Polycarpo, E; Popov, D; Popovici, B; Potterat, C; Powell, A; Prisciandaro, J; Pugatch, V; Puig Navarro, A; Qian, W; Rademacker, J H; Rakotomiaramanana, B; Rangel, M S; Raniuk, I; Raven, G; Redford, S; Reid, M M; dos Reis, A C; Ricciardi, S; Richards, A; Rinnert, K; Roa Romero, D A; Robbe, P; Rodrigues, E; Rodrigues, F; Rodriguez Perez, P; Rogers, G J; Roiser, S; Romanovsky, V; Rosello, M; Rouvinet, J; Ruf, T; Ruiz, H; Sabatino, G; Saborido Silva, J J; Sagidova, N; Sail, P; Saitta, B; Salzmann, C; Sannino, M; Santacesaria, R; Santamarina Rios, C; Santinelli, R; Santovetti, E; Sapunov, M; Sarti, A; Satriano, C; Satta, A; Savrie, M; Savrina, D; Schaack, P; Schiller, M; Schindler, H; Schleich, S; Schlupp, M; Schmelling, M; Schmidt, B; Schneider, O; Schopper, A; Schune, M-H; Schwemmer, R; Sciascia, B; Sciubba, A; Seco, M; Semennikov, A; Senderowska, K; Sepp, I; Serra, N; Serrano, J; Seyfert, P; Shapkin, M; Shapoval, I; Shatalov, P; Shcheglov, Y; Shears, T; Shekhtman, L; Shevchenko, O; Shevchenko, V; Shires, A; Silva Coutinho, R; Skwarnicki, T; Smith, N A; Smith, E; Sobczak, K; Soler, F J P; Solomin, A; Soomro, F; Souza De Paula, B; Spaan, B; Sparkes, A; Spradlin, P; Stagni, F; Stahl, S; Steinkamp, O; Stoica, S; Stone, S; Storaci, B; Straticiuc, M; Straumann, U; Subbiah, V K; Swientek, S; Szczekowski, M; Szczypka, P; Szumlak, T; T'Jampens, S; Teodorescu, E; Teubert, F; Thomas, C; Thomas, E; van Tilburg, J; Tisserand, V; Tobin, M; Tolk, S; Topp-Joergensen, S; Torr, N; Tournefier, E; Tourneur, S; Tran, M T; Tsaregorodtsev, A; Tuning, N; Ubeda Garcia, M; Ukleja, A; Uwer, U; Vagnoni, V; Valenti, G; Vazquez Gomez, R; Vazquez Regueiro, P; Vecchi, S; Velthuis, J J; Veltri, M; Viaud, B; Videau, I; Vieira, D; Vilasis-Cardona, X; Visniakov, J; Vollhardt, A; Volyanskyy, D; Voong, D; Vorobyev, A; Vorobyev, V; Voss, H; Waldi, R; Wandernoth, S; Wang, J; Ward, D R; Watson, N K; Webber, A D; Websdale, D; Whitehead, M; Wiedner, D; Wiggers, L; Wilkinson, G; Williams, M P; Williams, M; Wilson, F F; Wishahi, J; Witek, M; Witzeling, W; Wotton, S A; Wyllie, K; Xie, Y; Xing, F; Xing, Z; Yang, Z; Young, R; Yushchenko, O; Zangoli, M; Zavertyaev, M; Zhang, F; Zhang, L; Zhang, W C; Zhang, Y; Zhelezov, A; Zhong, L; Zvyagin, A

    2012-01-01

    An analysis of $B^{\\pm}\\to DK^{\\pm}$ and $B^{\\pm}\\to D\\pi^{\\pm}$ decays is presented where the $D$ meson is reconstructed in the two-body final states:$K^{\\pm}\\pi^{\\mp}$, $K^+K^-$, $\\pi^+\\pi^-$ and $\\pi^{\\pm}K^{\\mp}$. Using $1.0{\\rm \\,fb}^{-1}$ of LHCb data, measurements of several observables are made including the first observation of the suppressed mode $B^{\\pm}\\to[\\pi^{\\pm}K^{\\mp}]_DK^{\\pm}$. $C\\!P$ violation in $B^{\\pm}\\to DK^{\\pm}$ decays is observed with $5.8\\,\\sigma$ significance.

  17. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  18. Observation of photon polarization in $B^\\pm \\to K^\\pm\\pi^\\mp\\pi^\\pm\\gamma$ decays

    CERN Multimedia

    Veneziano, G

    2014-01-01

    A study of the flavor-changing neutral current radiative $B^{\\pm} \\to K^{\\pm}\\pi^{\\mp}\\pi^{\\pm}\\gamma$ decays performed using data collected in proton-proton collisions with the LHCb detector at $7$ and $8\\,$TeV center-of-mass energies is presented. In this sample, corresponding to an integrated luminosity of $3\\,\\text{fb}^{-1}$, nearly $14\\,000$ signal events are reconstructed and selected, containing all possible intermediate resonances with a $K^{\\pm}\\pi^{\\mp}\\pi^{\\pm}$ final state in the $[1.1, 1.9]$\\,GeV/$c^{2}$ mass range. The distribution of the angle of the photon direction with respect to the plane defined by the final-state hadrons in their rest frame is studied in intervals of $K^{\\pm}\\pi^{\\mp}\\pi^{\\pm}$ mass and the asymmetry between the number of signal events found on each side of the plane is obtained. The first direct observation of the photon polarization in the $b \\to s\\gamma$ transition is reported with a significance of $5.2\\,\\sigma$.

  19. Wintertime indoor air levels of PM10, PM2.5 and PM1 at public places and their contributions to TSP.

    Science.gov (United States)

    Liu, Yangsheng; Chen, Rui; Shen, Xingxing; Mao, Xiaoling

    2004-04-01

    From 26 October 2002 to 8 March 2003, particulate matter (PM) concentrations (total suspended particles [TSP], PM10, PM2.5 and PM1) were measured at 49 public places representing different environments in the urban area of Beijing. The objectives of this study were (1) to characterize the indoor PM concentrations in public places, (2) to evaluate the potential indoor sources and (3) to investigate the contribution of PM10 to TSP and the contributions of PM2.5 and PM1 to PM10. Additionally, The indoor and outdoor particle concentrations in the same type of indoor environment were employed to investigate the I/O level, and comparison was made between I/O levels in different types of indoor environment. Construction activities and traffic condition were the major outdoor sources to influence the indoor particle levels. The contribution of PM10 to TSP was even up to 68.8%, while the contributions of PM2.5 and PM1 to PM10 were not as much as that of PM10 to TSP.

  20. Basic Characteristics of Human Erroneous Actions during Test and Maintenance Activities Leading to Unplanned Reactor Trips

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Park, Jin Kyun

    2010-01-01

    Test and maintenance (T and M) activities of nuclear power plants are essential for sustaining the safety of a power plant and maintaining the reliability of plant systems and components. However, the potential of human errors during T and M activities has also the potential to induce unplanned reactor trips or power derate or making safety-related systems unavailable. According to the major incident/accident reports of nuclear power plants in Korea, contribution of human errors takes up about 20% of the total events. The previous study presents that most of human-related unplanned reactor trip events during normal power operation are associated with T and M activities (63%), which are comprised of plant maintenance activities such as a 'periodic preventive maintenance (PPM)', a 'planned maintenance (PM)' and a 'corrective maintenance (CM)'. This means that T and M activities should be a major subject for reducing the frequency of human-related unplanned reactor trips. This paper aims to introduce basic characteristics of human erroneous actions involved in the test and maintenance-induced unplanned reactor trip events that have occurred between 1986 and 2006 in Korean nuclear power plants. The basic characteristics are described by dividing human erroneous actions into planning-based errors and execution-based errors. For the events associated with planning failures, they are, firstly, classified according to existence of the work procedure and then described for what aspects of the procedure or work plan have deficiency or problem. On the other hand, for the events associated with execution failures, they are described from the aspect of external error modes

  1. Partitioning of magnetic particles in PM10, PM2.5 and PM1 aerosols in the urban atmosphere of Barcelona (Spain)

    International Nuclear Information System (INIS)

    Revuelta, María Aránzazu; McIntosh, Gregg; Pey, Jorge; Pérez, Noemi; Querol, Xavier; Alastuey, Andrés

    2014-01-01

    A combined magnetic-chemical study of 15 daily, simultaneous PM 10 –PM 2.5 –PM 1 urban background aerosol samples has been carried out. The magnetic properties are dominated by non-stoichiometric magnetite, with highest concentrations seen in PM 10 . Low temperature magnetic analyses showed that the superparamagnetic fraction is more abundant when coarse, multidomain particles are present, confirming that they may occur as an oxidized outer shell around coarser grains. A strong association of the magnetic parameters with a vehicular PM 10 source has been identified. Strong correlations found with Cu and Sb suggests that this association is related to brake abrasion emissions rather than exhaust emissions. For PM 1 the magnetic remanence parameters are more strongly associated with crustal sources. Two crustal sources are identified in PM 1 , one of which is of North African origin. The magnetic particles are related to this source and so may be used to distinguish North African dust from other sources in PM 1 . - Highlights: • Magnetic properties of PM 10 , PM 2.5 and PM 1 defined for a Mediterranean urban site. • Vehicular source of magnetic particles dominates in PM 10 . • Crustal source of magnetic particles dominates in PM 1 . • Magnetic remanence may distinguish between North African and regional dust in PM 1 . - Capsule abstract two sources of magnetic atmospheric particles have been identified in Barcelona, a vehicular source which dominates in PM 10 and a crustal source that dominates in PM 1

  2. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  3. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  4. Concepts for measuring maintenance performance and methods for analysing competing failure modes

    International Nuclear Information System (INIS)

    Cooke, Roger; Paulsen, Jette

    1997-01-01

    Measurement of maintenance performance is done on the basis of component history data in which service sojourns are distinguished according to whether they terminate in corrective or preventive maintenance. From the viewpoint of data analysis, corrective and preventive maintenance constitute competing failure nudes. This article examines ways to assess maintenance performance without introducing statistical assumptions, then introduces a plausible statistical model for describing the interaction of preventive and corrective maintenance, and finally illustrates these with examples from the Nordic TUD data system

  5. PM2006: a highly scalable urban planning management information system--Case study: Suzhou Urban Planning Bureau

    Science.gov (United States)

    Jing, Changfeng; Liang, Song; Ruan, Yong; Huang, Jie

    2008-10-01

    During the urbanization process, when facing complex requirements of city development, ever-growing urban data, rapid development of planning business and increasing planning complexity, a scalable, extensible urban planning management information system is needed urgently. PM2006 is such a system that can deal with these problems. In response to the status and problems in urban planning, the scalability and extensibility of PM2006 are introduced which can be seen as business-oriented workflow extensibility, scalability of DLL-based architecture, flexibility on platforms of GIS and database, scalability of data updating and maintenance and so on. It is verified that PM2006 system has good extensibility and scalability which can meet the requirements of all levels of administrative divisions and can adapt to ever-growing changes in urban planning business. At the end of this paper, the application of PM2006 in Urban Planning Bureau of Suzhou city is described.

  6. Status on system inspection and preventive maintenance of HANARO

    International Nuclear Information System (INIS)

    Kim, Young-Ki; Cho, Yeong-Garp; Kwag, Byung-Ho

    1999-01-01

    The HANARO is a 30 MW open pool type multi-purpose research reactor with forced light water coolant/moderator flows and heavy water annular reflector. The relatively small reactor core uses a low enriched fuel and is designed to maximize the power density, thus providing the required neutron flux for various research activities. It is mainly used for radioisotope production, nuclear material testing and neutron physics experiments. The initial criticality was achieved February 1995. Considering the importance of their functionality from the safety point of view, some components and equipment are categorized into a nuclear safety grade. There are three different inspection activities for the various reactor systems and components - a Surveillance Inspection(SI) for the safety grades and a Periodic Inspection (PI) for the non-safety grades and In-Service Inspection (ISI) for the ASME Sec.III components. All of the SIs are specified and required by the safety analysis report. The SI also differs from the PI in such a point that all kinds of activities for the SIs should be accompanied by an appropriate quality assurance, while for the PIs it is not necessarily mandatory. In addition, the inspection results for the SIs should go through an examination from regulatory body every two years and specific functions of the critical components or systems are demonstrated under the witness by the governmental inspector. The ISI is required and carried out as per international codes and standards as well as Korean atomic energy regulations. There are 54 SIs, 25 PIs and 4 ISIs for the HANARO. This paper concentrates on the managing strategy and its practices for the SIs and ISIs of the safety-related components, currently being done at HANARO. Most parts of the inspections fall into a group for the periodic performance testing and/or equipment calibration. Some mechanical inspections like a torque measurement are grouped into a preventive maintenance. Lastly the ASME Sec

  7. A production model and maintenance planning model for the process industry

    NARCIS (Netherlands)

    Ashayeri, J.; Teelen, A.; Selen, W.J.

    1995-01-01

    In this paper a model is developed to simultaneously plan preventive maintenance and production in a process industry environment, where maintenance planning is extremely important. The model schedules production jobs and preventive maintenance jobs, while minimizing costs associated with

  8. Effect of Maintenance Therapy with Isoxsuprine in the Prevention of Preterm Labor: Randomized controlled trial

    Science.gov (United States)

    Alavi, Azin; Rajaee, Minoo; Amirian, Malihe; Mahboobi, Hamidreza; Jahanshahi, Keramat Allah; Faghihi, Armaghan

    2015-01-01

    Background: Isoxsuprine (Vasodilan) is a beta-adrenergic that directly affects the vascular smooth muscle and results in peripheral vascular dilation. Isoxsuprine relaxes the uterine smooth muscles and is used for treatment of pre-term labor and dysmenorrhea. Isoxsuprine is used extensively in hospitals and private clinics in Iran; however, few studies have reported its safety and efficacy in the prevention of pre-term labor. Objective: The aim of this study was to assess the effect of maintenance therapy with oral isoxsuprine for the prevention of pre-term labor. Methods: We undertook a blinded prospective randomized trial of 70 women with singleton pregnancies who presented in pre-term labor between 26 to 34 weeks of gestation. After arresting the contractions with intravenous magnesium sulfate, the patients were randomized into two groups, with the treatment group receiving oral isoxsuprine until 34 weeks of gestation. Response to treatment was assessed by the progression of the pregnancies in both groups. The data were analyzed using SPSS software. Results: Our results showed that 14 (40%) of the patients in the case group and 12 (34.29%) of patients in the control group had pre-term births, and there was no significant difference between the two groups (P=0.621). Also four women (11.43%) in the case group and five women (14.29%) in the control group delivered before 34 weeks (P=0.721). Conclusion: Oral isoxsuprine was not effective as a maintenance treatment in preventing pre-term births or in delaying delivery until after 34 weeks. Larger studies are needed to identify the best treatment for pre-term labor. PMID:26396726

  9. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  10. A study of CP violation in $B^\\pm \\to D K^\\pm$ and $B^\\pm \\to D \\pi^\\pm$ decays with $D \\to K^0_{\\rm S} K^\\pm \\pi^\\mp$ final states

    CERN Document Server

    Aaij, Roel; Adinolfi, Marco; Affolder, Anthony; Ajaltouni, Ziad; Albrecht, Johannes; Alessio, Federico; Alexander, Michael; Ali, Suvayu; Alkhazov, Georgy; Alvarez Cartelle, Paula; Alves Jr, Antonio; Amato, Sandra; Amerio, Silvia; Amhis, Yasmine; Anderlini, Lucio; Anderson, Jonathan; Andreassen, Rolf; Andreotti, Mirco; Andrews, Jason; Appleby, Robert; Aquines Gutierrez, Osvaldo; Archilli, Flavio; Artamonov, Alexander; Artuso, Marina; Aslanides, Elie; Auriemma, Giulio; Baalouch, Marouen; Bachmann, Sebastian; Back, John; Badalov, Alexey; Balagura, Vladislav; Baldini, Wander; Barlow, Roger; Barschel, Colin; Barsuk, Sergey; Barter, William; Batozskaya, Varvara; Bauer, Thomas; Bay, Aurelio; Beddow, John; Bedeschi, Franco; Bediaga, Ignacio; Belogurov, Sergey; Belous, Konstantin; Belyaev, Ivan; Ben-Haim, Eli; Bencivenni, Giovanni; Benson, Sean; Benton, Jack; Berezhnoy, Alexander; Bernet, Roland; Bettler, Marc-Olivier; van Beuzekom, Martinus; Bien, Alexander; Bifani, Simone; Bird, Thomas; Bizzeti, Andrea; Bjørnstad, Pål Marius; Blake, Thomas; Blanc, Frédéric; Blouw, Johan; Blusk, Steven; Bocci, Valerio; Bondar, Alexander; Bondar, Nikolay; Bonivento, Walter; Borghi, Silvia; Borgia, Alessandra; Borsato, Martino; Bowcock, Themistocles; Bowen, Espen Eie; Bozzi, Concezio; Brambach, Tobias; van den Brand, Johannes; Bressieux, Joël; Brett, David; Britsch, Markward; Britton, Thomas; Brook, Nicholas; Brown, Henry; Bursche, Albert; Busetto, Giovanni; Buytaert, Jan; Cadeddu, Sandro; Calabrese, Roberto; Callot, Olivier; Calvi, Marta; Calvo Gomez, Miriam; Camboni, Alessandro; Campana, Pierluigi; Campora Perez, Daniel; Carbone, Angelo; Carboni, Giovanni; Cardinale, Roberta; Cardini, Alessandro; Carranza-Mejia, Hector; Carson, Laurence; Carvalho Akiba, Kazuyoshi; Casse, Gianluigi; Cassina, Lorenzo; Castillo Garcia, Lucia; Cattaneo, Marco; Cauet, Christophe; Cenci, Riccardo; Charles, Matthew; Charpentier, Philippe; Cheung, Shu-Faye; Chiapolini, Nicola; Chrzaszcz, Marcin; Ciba, Krzystof; Cid Vidal, Xabier; Ciezarek, Gregory; Clarke, Peter; Clemencic, Marco; Cliff, Harry; Closier, Joel; Coca, Cornelia; Coco, Victor; Cogan, Julien; Cogneras, Eric; Collins, Paula; Comerma-Montells, Albert; Contu, Andrea; Cook, Andrew; Coombes, Matthew; Coquereau, Samuel; Corti, Gloria; Counts, Ian; Couturier, Benjamin; Cowan, Greig; Craik, Daniel Charles; Cruz Torres, Melissa Maria; Cunliffe, Samuel; Currie, Robert; D'Ambrosio, Carmelo; Dalseno, Jeremy; David, Pascal; David, Pieter; Davis, Adam; De Bonis, Isabelle; De Bruyn, Kristof; De Capua, Stefano; De Cian, Michel; De Miranda, Jussara; De Paula, Leandro; De Silva, Weeraddana; De Simone, Patrizia; Decamp, Daniel; Deckenhoff, Mirko; Del Buono, Luigi; Déléage, Nicolas; Derkach, Denis; Deschamps, Olivier; Dettori, Francesco; Di Canto, Angelo; Dijkstra, Hans; Donleavy, Stephanie; Dordei, Francesca; Dorigo, Mirco; Dorosz, Piotr; Dosil Suárez, Alvaro; Dossett, David; Dovbnya, Anatoliy; Dupertuis, Frederic; Durante, Paolo; Dzhelyadin, Rustem; Dziurda, Agnieszka; Dzyuba, Alexey; Easo, Sajan; Egede, Ulrik; Egorychev, Victor; Eidelman, Semen; Eisenhardt, Stephan; Eitschberger, Ulrich; Ekelhof, Robert; Eklund, Lars; El Rifai, Ibrahim; Elsasser, Christian; Esen, Sevda; Falabella, Antonio; Färber, Christian; Farinelli, Chiara; Farry, Stephen; Ferguson, Dianne; Fernandez Albor, Victor; Ferreira Rodrigues, Fernando; Ferro-Luzzi, Massimiliano; Filippov, Sergey; Fiore, Marco; Fiorini, Massimiliano; Fitzpatrick, Conor; Fontana, Marianna; Fontanelli, Flavio; Forty, Roger; Francisco, Oscar; Frank, Markus; Frei, Christoph; Frosini, Maddalena; Fu, Jinlin; Furfaro, Emiliano; Gallas Torreira, Abraham; Galli, Domenico; Gandelman, Miriam; Gandini, Paolo; Gao, Yuanning; Garofoli, Justin; Garra Tico, Jordi; Garrido, Lluis; Gaspar, Clara; Gauld, Rhorry; Gavardi, Laura; Gersabeck, Evelina; Gersabeck, Marco; Gershon, Timothy; Ghez, Philippe; Gianelle, Alessio; Giani', Sebastiana; Gibson, Valerie; Giubega, Lavinia-Helena; Gligorov, Vladimir; Göbel, Carla; Golubkov, Dmitry; Golutvin, Andrey; Gomes, Alvaro; Gordon, Hamish; Grabalosa Gándara, Marc; Graciani Diaz, Ricardo; Granado Cardoso, Luis Alberto; Graugés, Eugeni; Graziani, Giacomo; Grecu, Alexandru; Greening, Edward; Gregson, Sam; Griffith, Peter; Grillo, Lucia; Grünberg, Oliver; Gui, Bin; Gushchin, Evgeny; Guz, Yury; Gys, Thierry; Hadjivasiliou, Christos; Haefeli, Guido; Haen, Christophe; Hafkenscheid, Tom; Haines, Susan; Hall, Samuel; Hamilton, Brian; Hampson, Thomas; Hansmann-Menzemer, Stephanie; Harnew, Neville; Harnew, Samuel; Harrison, Jonathan; Hartmann, Thomas; He, Jibo; Head, Timothy; Heijne, Veerle; Hennessy, Karol; Henrard, Pierre; Henry, Louis; Hernando Morata, Jose Angel; van Herwijnen, Eric; Heß, Miriam; Hicheur, Adlène; Hill, Donal; Hoballah, Mostafa; Hombach, Christoph; Hulsbergen, Wouter; Hunt, Philip; Hussain, Nazim; Hutchcroft, David; Hynds, Daniel; Iakovenko, Viktor; Idzik, Marek; Ilten, Philip; Jacobsson, Richard; Jaeger, Andreas; Jans, Eddy; Jaton, Pierre; Jawahery, Abolhassan; Jing, Fanfan; John, Malcolm; Johnson, Daniel; Jones, Christopher; Joram, Christian; Jost, Beat; Jurik, Nathan; Kaballo, Michael; Kandybei, Sergii; Kanso, Wallaa; Karacson, Matthias; Karbach, Moritz; Kelsey, Matthew; Kenyon, Ian; Ketel, Tjeerd; Khanji, Basem; Khurewathanakul, Chitsanu; Klaver, Suzanne; Kochebina, Olga; Komarov, Ilya; Koopman, Rose; Koppenburg, Patrick; Korolev, Mikhail; Kozlinskiy, Alexandr; Kravchuk, Leonid; Kreplin, Katharina; Kreps, Michal; Krocker, Georg; Krokovny, Pavel; Kruse, Florian; Kucharczyk, Marcin; Kudryavtsev, Vasily; Kurek, Krzysztof; Kvaratskheliya, Tengiz; La Thi, Viet Nga; Lacarrere, Daniel; Lafferty, George; Lai, Adriano; Lambert, Dean; Lambert, Robert W; Lanciotti, Elisa; Lanfranchi, Gaia; Langenbruch, Christoph; Latham, Thomas; Lazzeroni, Cristina; Le Gac, Renaud; van Leerdam, Jeroen; Lees, Jean-Pierre; Lefèvre, Regis; Leflat, Alexander; Lefrançois, Jacques; Leo, Sabato; Leroy, Olivier; Lesiak, Tadeusz; Leverington, Blake; Li, Yiming; Liles, Myfanwy; Lindner, Rolf; Linn, Christian; Lionetto, Federica; Liu, Bo; Liu, Guoming; Lohn, Stefan; Longstaff, Ian; Lopes, Jose; Lopez-March, Neus; Lowdon, Peter; Lu, Haiting; Lucchesi, Donatella; Luisier, Johan; Luo, Haofei; Luppi, Eleonora; Lupton, Oliver; Machefert, Frederic; Machikhiliyan, Irina V; Maciuc, Florin; Maev, Oleg; Malde, Sneha; Manca, Giulia; Mancinelli, Giampiero; Manzali, Matteo; Maratas, Jan; Marconi, Umberto; Marino, Pietro; Märki, Raphael; Marks, Jörg; Martellotti, Giuseppe; Martens, Aurelien; Martín Sánchez, Alexandra; Martinelli, Maurizio; Martinez Santos, Diego; Martinez Vidal, Fernando; Martins Tostes, Danielle; Massafferri, André; Matev, Rosen; Mathe, Zoltan; Matteuzzi, Clara; Mazurov, Alexander; McCann, Michael; McCarthy, James; McNab, Andrew; McNulty, Ronan; McSkelly, Ben; Meadows, Brian; Meier, Frank; Meissner, Marco; Merk, Marcel; Milanes, Diego Alejandro; Minard, Marie-Noelle; Molina Rodriguez, Josue; Monteil, Stephane; Moran, Dermot; Morandin, Mauro; Morawski, Piotr; Mordà, Alessandro; Morello, Michael Joseph; Mountain, Raymond; Muheim, Franz; Müller, Katharina; Muresan, Raluca; Muryn, Bogdan; Muster, Bastien; Naik, Paras; Nakada, Tatsuya; Nandakumar, Raja; Nasteva, Irina; Needham, Matthew; Neri, Nicola; Neubert, Sebastian; Neufeld, Niko; Nguyen, Anh Duc; Nguyen, Thi-Dung; Nguyen-Mau, Chung; Nicol, Michelle; Niess, Valentin; Niet, Ramon; Nikitin, Nikolay; Nikodem, Thomas; Novoselov, Alexey; Oblakowska-Mucha, Agnieszka; Obraztsov, Vladimir; Oggero, Serena; Ogilvy, Stephen; Okhrimenko, Oleksandr; Oldeman, Rudolf; Onderwater, Gerco; Orlandea, Marius; Otalora Goicochea, Juan Martin; Owen, Patrick; Oyanguren, Maria Arantza; Pal, Bilas Kanti; Palano, Antimo; Palombo, Fernando; Palutan, Matteo; Panman, Jacob; Papanestis, Antonios; Pappagallo, Marco; Pappalardo, Luciano; Parkes, Christopher; Parkinson, Christopher John; Passaleva, Giovanni; Patel, Girish; Patel, Mitesh; Patrignani, Claudia; Pavel-Nicorescu, Carmen; Pazos Alvarez, Antonio; Pearce, Alex; Pellegrino, Antonio; Penso, Gianni; Pepe Altarelli, Monica; Perazzini, Stefano; Perez Trigo, Eliseo; Perret, Pascal; Perrin-Terrin, Mathieu; Pescatore, Luca; Pesen, Erhan; Pessina, Gianluigi; Petridis, Konstantin; Petrolini, Alessandro; Picatoste Olloqui, Eduardo; Pietrzyk, Boleslaw; Pilař, Tomas; Pinci, Davide; Pistone, Alessandro; Playfer, Stephen; Plo Casasus, Maximo; Polci, Francesco; Polok, Grzegorz; Poluektov, Anton; Polycarpo, Erica; Popov, Alexander; Popov, Dmitry; Popovici, Bogdan; Potterat, Cédric; Powell, Andrew; Prisciandaro, Jessica; Pritchard, Adrian; Prouve, Claire; Pugatch, Valery; Puig Navarro, Albert; Punzi, Giovanni; Qian, Wenbin; Rachwal, Bartolomiej; Rademacker, Jonas; Rakotomiaramanana, Barinjaka; Rama, Matteo; Rangel, Murilo; Raniuk, Iurii; Rauschmayr, Nathalie; Raven, Gerhard; Redford, Sophie; Reichert, Stefanie; Reid, Matthew; dos Reis, Alberto; Ricciardi, Stefania; Richards, Alexander; Rinnert, Kurt; Rives Molina, Vincente; Roa Romero, Diego; Robbe, Patrick; Roberts, Douglas; Rodrigues, Ana Barbara; Rodrigues, Eduardo; Rodriguez Perez, Pablo; Roiser, Stefan; Romanovsky, Vladimir; Romero Vidal, Antonio; Rotondo, Marcello; Rouvinet, Julien; Ruf, Thomas; Ruffini, Fabrizio; Ruiz, Hugo; Ruiz Valls, Pablo; Sabatino, Giovanni; Saborido Silva, Juan Jose; Sagidova, Naylya; Sail, Paul; Saitta, Biagio; Salustino Guimaraes, Valdir; Sanmartin Sedes, Brais; Santacesaria, Roberta; Santamarina Rios, Cibran; Santovetti, Emanuele; Sapunov, Matvey; Sarti, Alessio; Satriano, Celestina; Satta, Alessia; Savrie, Mauro; Savrina, Darya; Schiller, Manuel; Schindler, Heinrich; Schlupp, Maximilian; Schmelling, Michael; Schmidt, Burkhard; Schneider, Olivier; Schopper, Andreas; Schune, Marie Helene; Schwemmer, Rainer; Sciascia, Barbara; Sciubba, Adalberto; Seco, Marcos; Semennikov, Alexander; Senderowska, Katarzyna; Sepp, Indrek; Serra, Nicola; Serrano, Justine; Seyfert, Paul; Shapkin, Mikhail; Shapoval, Illya; Shcheglov, Yury; Shears, Tara; Shekhtman, Lev; Shevchenko, Oksana; Shevchenko, Vladimir; Shires, Alexander; Silva Coutinho, Rafael; Simi, Gabriele; Sirendi, Marek; Skidmore, Nicola; Skwarnicki, Tomasz; Smith, Anthony; Smith, Edmund; Smith, Eluned; Smith, Jackson; Smith, Mark; Snoek, Hella; Sokoloff, Michael; Soler, Paul; Soomro, Fatima; Souza, Daniel; Souza De Paula, Bruno; Spaan, Bernhard; Sparkes, Ailsa; Spinella, Franco; Spradlin, Patrick; Stagni, Federico; Stahl, Sascha; Steinkamp, Olaf; Stevenson, Scott; Stoica, Sabin; Stone, Sheldon; Storaci, Barbara; Stracka, Simone; Straticiuc, Mihai; Straumann, Ulrich; Stroili, Roberto; Subbiah, Vijay Kartik; Sun, Liang; Sutcliffe, William; Swientek, Stefan; Syropoulos, Vasileios; Szczekowski, Marek; Szczypka, Paul; Szilard, Daniela; Szumlak, Tomasz; T'Jampens, Stephane; Teklishyn, Maksym; Tellarini, Giulia; Teodorescu, Eliza; Teubert, Frederic; Thomas, Christopher; Thomas, Eric; van Tilburg, Jeroen; Tisserand, Vincent; Tobin, Mark; Tolk, Siim; Tomassetti, Luca; Tonelli, Diego; Topp-Joergensen, Stig; Torr, Nicholas; Tournefier, Edwige; Tourneur, Stephane; Tran, Minh Tâm; Tresch, Marco; Tsaregorodtsev, Andrei; Tsopelas, Panagiotis; Tuning, Niels; Ubeda Garcia, Mario; Ukleja, Artur; Ustyuzhanin, Andrey; Uwer, Ulrich; Vagnoni, Vincenzo; Valenti, Giovanni; Vallier, Alexis; Vazquez Gomez, Ricardo; Vazquez Regueiro, Pablo; Vázquez Sierra, Carlos; Vecchi, Stefania; Velthuis, Jaap; Veltri, Michele; Veneziano, Giovanni; Vesterinen, Mika; Viaud, Benoit; Vieira, Daniel; Vilasis-Cardona, Xavier; Vollhardt, Achim; Volyanskyy, Dmytro; Voong, David; Vorobyev, Alexey; Vorobyev, Vitaly; Voß, Christian; Voss, Helge; de Vries, Jacco; Waldi, Roland; Wallace, Charlotte; Wallace, Ronan; Wandernoth, Sebastian; Wang, Jianchun; Ward, David; Watson, Nigel; Webber, Adam Dane; Websdale, David; Whitehead, Mark; Wicht, Jean; Wiechczynski, Jaroslaw; Wiedner, Dirk; Wiggers, Leo; Wilkinson, Guy; Williams, Matthew; Williams, Mike; Wilson, Fergus; Wimberley, Jack; Wishahi, Julian; Wislicki, Wojciech; Witek, Mariusz; Wormser, Guy; Wotton, Stephen; Wright, Simon; Wu, Suzhi; Wyllie, Kenneth; Xie, Yuehong; Xing, Zhou; Yang, Zhenwei; Yuan, Xuhao; Yushchenko, Oleg; Zangoli, Maria; Zavertyaev, Mikhail; Zhang, Feng; Zhang, Liming; Zhang, Wen Chao; Zhang, Yanxi; Zhelezov, Alexey; Zhokhov, Anatoly; Zhong, Liang; Zvyagin, Alexander

    2014-01-01

    A first study of CP violation in the decay modes $B^\\pm\\to [K^0_{\\rm S} K^\\pm \\pi^\\mp]_D h^\\pm$ and $B^\\pm\\to [K^0_{\\rm S} K^\\mp \\pi^\\pm]_D h^\\pm$, where $h$ labels a $K$ or $\\pi$ meson and $D$ labels a $D^0$ or $\\overline{D}^0$ meson, is performed. The analysis uses the LHCb data set collected in $pp$ collisions, corresponding to an integrated luminosity of 3 fb$^{-1}$. The analysis is sensitive to the CP-violating CKM phase $\\gamma$ through seven observables: one charge asymmetry in each of the four modes and three ratios of the charge-integrated yields. The results are consistent with measurements of $\\gamma$ using other decay modes.

  11. Machine Maintenance Scheduling with Reliability Engineering Method and Maintenance Value Stream Mapping

    Science.gov (United States)

    Sembiring, N.; Nasution, A. H.

    2018-02-01

    Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.

  12. Indoor pollution: PM2.5 and PM10 from cigarette smoke

    International Nuclear Information System (INIS)

    Chianese, E.; Barone, G.; Castaldo, R.M.; Riccio, A.

    2009-01-01

    This work is aimed to establishing the temporal and spatial dispersion of PM 10 and PM 2.5 particulate matter fractions generated by cigarettes smoking in an indoor ambient. To this purpose, PM 10 and PM 2.5 concentrations were collected with a mobile instrument positioned in a room accommodating a smoking machine. [it

  13. Characteristics of PM1.0, PM2.5, and PM10, and Their Relation to Black Carbon in Wuhan, Central China

    Directory of Open Access Journals (Sweden)

    Wei Gong

    2015-09-01

    Full Text Available Hourly average monitoring data for mass concentrations of PM1, PM2.5, PM10, and black carbon (BC were measured in Wuhan from December 2013 to December 2014, which has a flourishing steel industry, to analyze the characteristics of PM and their relation to BC, using statistical methods. The results indicate that variations in the monthly average mass concentrations of PM have similar concave parabolic shapes, with the highest values occurring in January and the lowest values appearing in August or September. The correlation coefficient of the linear regression model between PM1 and PM2.5 is quite high, reaching 0.99. Furthermore, the proportion of PM1 contained within PM2.5 is roughly 90%, directly proving that ultrafine particles whose diameter less than 1 μm may be a primary component of PM2.5 in Wuhan. Additionally, better seasonal correlation between PM and BC occurs only in summer and autumn, due to multiple factors such as topography, temperature, and the atmosphere in winter and spring. Finally, analysis of the diurnal variation of PM and BC demonstrates that the traffic emissions during rush hour, exogenous pollutants, and the shallow PBLH with stagnant atmosphere, all contribute to the severe pollution of Wuhan in winter.

  14. Local contribution of wood combustion to PM10 and PM2.5; Lokale bijdrage van houtverbranding aan PM10 en PM2,5

    Energy Technology Data Exchange (ETDEWEB)

    Kos, G.; Weijers, E. [ECN Biomassa, Kolen en Milieuonderzoek, Petten (Netherlands)

    2011-04-15

    In February 2009 the concentration of wood smoke in a residential area in Schoorl (Noord-Holland, Netherlands) was investigated over a period of three weeks. The aim was to assess the effect of local particulate matter (PM) emissions - caused by heating with wood stoves in this area - on local PM concentration. [Dutch] In februari 2009 zijn in Schoorl in Noord-Holland concentraties houtrook bepaald door levoglucosanmetingen (een voor houtrook kenmerkende koolwaterstofverbinding). Lokale houtrook draagt daar significant bij aan de concentratie fijn stof: tussen 9% en 27% voor PM10 en tussen 30% en 39% voor PM2,5.

  15. Failure and Maintenance Analysis Using Web-Based Reliability Database System

    International Nuclear Information System (INIS)

    Hwang, Seok Won; Kim, Myoung Su; Seong, Ki Yeoul; Na, Jang Hwan; Jerng, Dong Wook

    2007-01-01

    introduced for the categorization and statistical treatments such as Common Cause Failure analyses and Bayesian update. The web-based reliability database system would be useful not only for PSA and Risk Informed Application, but for the plant operation and maintenance optimization. Furthermore, the database system would effectively support the development and application of Preventive Maintenance (PM) template, implementation of Maintenance Rule, and Equipment Reliability (ER) improvement program as well

  16. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  17. Comparative evaluation of maintenance performance using subsurvival functions

    DEFF Research Database (Denmark)

    Paulsen, J.L.; Cooke, R.; Nyman, R.

    1997-01-01

    Subsurvival functions are applied to operational data for the control rod drive systems of Nordic nuclear reactors to evaluate maintenance performance. Competing failure modes are preventive and corrective maintenance. Maintenance indicators are defined and evaluated for 8 plants. (C) 1997 Elsevier...

  18. Human factor analysis and preventive countermeasures of maintenance in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Hu Chao

    2008-01-01

    Based on the human error analysis theory and the characteristics of maintenance in a nuclear power plant, human factors of maintenance in NPP are divided into three different areas: human, technology, and organization, in which human refers to the individual factors, mainly including psychological quality, physiological characteristic, state of health, knowledge, skill level, and interpersonal relationship. Technology includes the maintenance technology, maintenance strategy, maintenance tool, maintenance interface, maintenance regulation, and work environment. Organization includes task arrangement, information communication, training, personnel external environment, team construction, and leadership. The analysis also reveals that the organization factors, which can indirectly influence personnel performance, are the primary initiators of human error. Based on these, some countermeasures are brought forward in order to reduce human errors. (authors)

  19. New measurement of the $K^{\\pm} \\to \\pi^{\\pm}\\mu^{+}\\mu^{-}$ decay

    CERN Document Server

    Batley, J.R.; Lazzeroni, C.; Munday, D.J.; Slater, M.W.; Wotton, S.A.; Arcidiacono, R.; Bocquet, G.; Cabibbo, N.; Ceccucci, A.; Cundy, D.; Falaleev, V.; Fidecaro, M.; Gatignon, L.; Gonidec, A.; Kubischta, W.; Norton, A.; Maier, A.; Patel, M.; Peters, A.; Balev, S.; Frabetti, P.L.; Goudzovski, E.; Hristov, P.; Kekelidze, V.; Kozhuharov, V.; Litov, L.; Madigozhin, D.; Marinova, E.; Molokanova, N.; Polenkevich, I.; Potrebenikov, Yu.; Stoynev, S.; Zinchenko, A.; Monnier, E.; Swallow, E.; Winston, R.; Rubin, P.; Walker, A.; Baldini, W.; Cotta Ramusino, A.; Dalpiaz, P.; Damiani, C.; Fiorini, M.; Gianoli, A.; Martini, M.; Petrucci, F.; Savrie, M.; Scarpa, M.; Wahl, H.; Bizzeti, A.; Lenti, M.; Veltri, M.; Calvetti, M.; Celeghini, E.; Iacopini, E.; Ruggiero, G.; Behler, M.; Eppard, K.; Kleinknecht, K.; Marouelli, P.; Masetti, L.; Moosbrugger, U.; Morales Morales, C.; Renk, B.; Wache, M.; Wanke, R.; Winhart, A.; Coward, D.; Dabrowski, A.; Fonseca Martin, T.; Shieh, M.; Szleper, M.; Velasco, M.; Wood, M.D.; Cenci, P.; Pepe, M.; Petrucci, M.C.; Anzivino, G.; Imbergamo, E.; Nappi, A.; Piccini, M.; Raggi, M.; Valdata-Nappi, M.; Cerri, C.; Fantechi, R.; Collazuol, G.; Di Lella, L.; Lamanna, G.; Mannelli, I.; Michetti, A.; Costantini, F.; Doble, N.; Fiorini, L.; Giudici, S.; Pierazzini, G.; Sozzi, M.; Venditti, S.; Bloch-Devaux, B.; Cheshkov, C.; Cheze, J.B.; De Beer, M.; Derre, J.; Marel, G.; Mazzucato, E.; Peyaud, B.; Vallage, B.; Holder, M.; Ziolkowski, M.; Biino, C.; Cartiglia, N.; Marchetto, F.; Bifani, S.; Clemencic, M.; Goy Lopez, S.; Dibon, H.; Jeitler, M.; Markytan, M.; Mikulec, I.; Neuhofer, G.; Widhalm, L.

    2011-01-01

    A sample of 3120 $K^\\pm\\to\\pi^\\pm\\mu^+\\mu^-$ decay candidates with $(3.3\\pm0.7)$% background contamination has been collected by the NA48/2 experiment at the CERN SPS, allowing a detailed study of the decay properties. The branching ratio was measured to be ${\\rm BR}=(9.62\\pm0.25)\\times 10^{-8}$. The form factor $W(z)$, where $z=(M_{\\mu\\mu}/M_K)^2$, was parameterized according to several models. In particular, the slope of the linear form factor $W(z)=W_0(1+\\delta z)$ was measured to be $\\delta=3.11\\pm0.57$. Upper limits of $2.9\\times 10^{-2}$ and $2.3\\times 10^{-2}$ on possible charge asymmetry and forward-backward asymmetry were established at 90% CL. An upper limit ${\\rm BR}(K^\\pm\\to\\pi^\\mp\\mu^\\pm\\mu^\\pm)<1.1\\times 10^{-9}$ was established at 90% CL for the rate of the lepton number violating decay.

  20. Maintenance Planning for Historic Buildings

    Directory of Open Access Journals (Sweden)

    Diana Plian

    2008-01-01

    Full Text Available The key to good maintenance of historic buildings is a long-range maintenance plan. Long-range planning recognizes a responsibility to the future to prolong the useful life of a building by preserving it in its present condition and preventing or slowing deterioration and damage from natural or other causes.

  1. Measurements of PM1, PM2.5 and PM10 at Nordic background stations using low-cost equipment

    DEFF Research Database (Denmark)

    Ferm, Martin; Areskoug, Hans; Makkonen, Ulla

    Mass concentrations of PM1, PM2.5 and PM10 in air were measured at four EMEP stations in the Nordic countries during 2006. All stations used the same low-cost equipment for sampling PM1, but used different techniques for the other size fractions. The PM1 filters were analysed for inorganic ions...... for the first half of June. PM1 constituted on average more than half of the PM2.5 concentrations, but was on average less than half of the PM10 concentrations. There were two episodes of high PM1 concentrations during the year, one in May-June and another one in August-September. The highest PM1 concentrations...... on a daily basis. The PM2.5 concentration, which is the parameter that should be measured within EU, correlated fairly well with the concentration of accumulation mode particles (PM1). In June only a minor fraction of PM1 consisted of inorganic ions. Only ammonium and sulphate ions of the measured ions in PM...

  2. Management of setpoint information using SAP-PM; Gerenciamento das informacoes de setpoints usando o SAP-PM

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Robison Tirre; Pereira, Paulo Manoel Borges [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    It is always a challenge to assure that the set points of field instruments and valves (e.g., transmitters, regulator valves, shut off valves, safety valves, etc) are adjusted in conformity either to the originally designed values or the ones established by the operations team, specially when multiple teams are involved in the activity. In such circumstances, keeping these values updated on proper data sheets is also a defying task. The correct information is essential to the Control Room operators and its accuracy is a step ahead towards operational availability and safety. TBG, through CMMS (Computerized Maintenance Management System) - SAP R/3, PM Module, developed a set of automated tools to integrate data from different environments (reports, handhelds, workflows and procedures), thus allowing allow a better control over the set point adjustment process. (author)

  3. Assessment of annual air pollution levels with PM1, PM2.5, PM10 and associated heavy metals in Algiers, Algeria.

    Science.gov (United States)

    Talbi, Abdelhamid; Kerchich, Yacine; Kerbachi, Rabah; Boughedaoui, Ménouèr

    2018-01-01

    Concentrations of particulate matter less than 1  μm, 2.5  μm, 10 μm and their contents of heavy metals were investigated in two different stations, urban and roadside at Algiers (Algeria). Sampling was conducted during two years by a high volume samplers (HVS) equipped with a cascade impactor at four levels stage, for one year sampling. The characterization of the heavy metals associated to the particulate matter (PM) was carried out by X-Ray Fluorescence analysis (XRF). The annual average concentration of PM 1 , PM 2.5 and PM 10 in both stations were 18.24, 32.23 and 60.01 μg m -3 respectively. The PM 1 , PM 2.5 and PM 10 concentrations in roadside varied from 13.46 to 25.59 μg m -3 , 20.82-49.85 μg m -3 and 45.90-77.23 μg m -3 respectively. However in the urban station, the PM 1 , PM 2.5 and PM 10 concentrations varied from 10.45 to 26.24 μg m -3 , 18.53-47.58 μg m -3 and 43.8-91.62 μg m -3 . The heavy metals associated to the PM were confirmed by Scanning Electron Microscopy-Energy Dispersive X-Ray analyses (SEM-EDX). The different spots of PM 2.5 analysis by SEM-EDX shows the presence of nineteen elements with anthropogenic and natural origins, within the heavy metal detected, the lead was found with maximum of 5% (weight percent). In order to determine the source contributions of PM levels at the two sampling sites sampling, principal compound analysis (PCA) was applied to the collected data. Statistical analysis confirmed anthropogenic source with traffic being a significant source and high contribution of natural emissions. At both sites, the PM 2.5 /PM 10 ratio is lower than that usually recorded in developed countries. The study of the back-trajectories of the air masses starting from Sahara shows that desert dust influences the concentration and the composition of the PM measured in Algiers. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Implementing a least cost and risk focused maintenance process

    International Nuclear Information System (INIS)

    Darling, S.S.

    1996-01-01

    The paper will focus on the vital role maintenance, big ''M'' (spares, PM program, planning and scheduling, turning the wrench), has in preserving return of investment, and safety in operation of high risk high value facilities/platforms. The maintenance process of today and for the future must utilize risk assessment and reliability engineering techniques to prioritize plant resources. The new process must provide for high levels of safety assurance yet allow for improved generation and transmission capacity while maintaining adequate system reliability. This approach ultimately leads to continuous and sustained reduction in operating cost, improved production capacity, and a safety culture based upon a risk determent cost-beneficial decision process

  5. 40 CFR 68.56 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.56 Maintenance. (a) The owner or operator shall prepare and implement procedures to maintain the on-going mechanical integrity of the process...

  6. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  7. Probabilistic approach to rationalization of plants maintenance

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Uchimoto, Tetsuya; Miya, Kenzo

    2001-01-01

    Since there are a lot of equipments in large plants, their safety and reliability cannot be kept as high level as designed without maintenance activities. Then preventive maintenance is intensively executed in some large plants. However, it will be inefficient to perform the preventive maintenance blindly. To make maintenance activities effective, it is essential to identify the critical equipments influencing plant safety and/or reliability and carry out the maintenance by focusing attentions on these equipments. It needs quantitative analyses to identify the critical equipments based on the data of failure rates. However, complete data set of failure rates cannot necessarily be available for some plants such as nuclear power plants. In this study, we carry out the reliability analysis for generic LNG plant and calculate various quantitative risk importance measures for each equipment. We propose rather qualitative representations for some quantitative measures, considering the situation without complete data set and conclude that it is possible to rationalize maintenance procedure by using these rather qualitative measures, though the level of rationalization is of course limited. (author)

  8. Inspection, evaluation and maintenance guidelines for reactor vessel internals in JAPAN

    International Nuclear Information System (INIS)

    Sakashita, Akihiro; Goto, Tomoya; Hirano, Shinro; Dozaki, Koji

    2010-01-01

    Inspection and Evaluation Guidelines for reactor internals has been taken into the Rules on Fitness-for–Service for Nuclear Power Plants of The Japan Society of Mechanical Engineers. It is a base of the maintenance plan of each Nuclear Power Plant. A plant maintenance methodology will have more importance to maintain the plant safety and stable plant operation. This paper introduces the systematization of the maintenance such as repair, replacement, preventive maintenance in these guidelines. Maintenance methodologies are classified follows. Repair: methodology to reinforce degraded parts by some methods or prevent progress of degradation of without replacement of the existing structure when the degradation of structure is actualized. Replacement: methodology to replace the existing structure with new one when the degradation of structure is actualized. Preventive maintenance : methodology to mitigate the damaged condition. When the maintenance methodologies are implemented in the actual plant, we have to consider the feedback of the inspection program and plant life management. (author)

  9. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Doyle, E.K.; Lee, C.-G.; Cho, D.

    2005-01-01

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  10. The local contribution of wood burning to PM10 and PM2.5; De lokale bijdrage van houtverbranding aan PM10 en PM2,5

    Energy Technology Data Exchange (ETDEWEB)

    Kos, G.; Weijers, E. [ECN Biomassa, Kolen en Milieuonderzoek, Petten (Netherlands)

    2011-04-15

    In January 2009, the concentrations of wood smoke in Schoorl, the Netherlands, were established by means of levoglucosan measurements (a hydrocarbon compound that is characteristic for wood smoke). Local wood smoke contributes significantly to the concentration of particulate matter: between 9% and 27% for PM10 and between 30% and 29% for PM2.5. [Dutch] In februari 2009 zijn in Schoorl in Noord-Holland concentraties houtrook bepaald door levoglucosanmetingen (een voor houtrook kenmerkende koolwaterstofverbinding). Lokale houtrook draagt daar significant bij aan de concentratie fijn stof: tussen 9% en 27% voor PM10 en tussen 30% en 39% voor PM2,5.

  11. Diagnosis of Dust- and Pollution- Impacted PM10, PM2.5, and PM1 Aerosols Observed at Gosan Climate Observatory

    Science.gov (United States)

    Shang, X.; Lee, M.; LIM, S.; Gustafsson, O.; Lee, G.; Chang, L.

    2017-12-01

    In East Asia, dust is prevalent and used to be mixed with various pollutants during transportation, causing a large uncertainty in estimating the climate forcing of aerosol and difficulty in making environmental policy. In order to diagnose the influence of dust particles on aerosol, we conducted a long-term measurement of PM10, PM2.5 and PM1 for mass, water-soluble ions, and carbonaceous compounds at Gosan Climate Observatory, South Korea from August 2007 to February 2012. The result of principle component analysis reveals that anthropogenic, typical soil dust, and saline dust impact explain 46 %, 16 %, and 9 % of the total variance for all samples, respectively. The mode analysis of mass distributions provides the criteria to distinguish these principle factors. The anthropogenic impact was most pronounced in PM1 and diagnosed by the PM1 mass higher than mean+σ. If PM10 mass was greater than mean+σ, it was highly likely to be affected by typical soil dust. This criterion is also applicable for PM2.5 mass, which was enhanced by both haze and dust particles, though. In the present study, saline dust was recognized by relatively high concentrations of Na and Cl ions in PM1.0. However, their existence was not manifested by increased mass in any of three PM types.

  12. Preventive and Predictive Maintenance, Warehousing of Spares, Periodic Testing and In-Service Inspection Activities at the Nigerian Research Reactor-1 Facility

    Energy Technology Data Exchange (ETDEWEB)

    Yusuf, I.; Mati, A. A.; Dewu, B. B.M., [Centre for Energy Research and Training, Ahmadu Bello University, Zaria (Nigeria)

    2014-08-15

    The Nigerian Research Reactor–1, or NIRR-1, is sited at Centre for Energy Research and Training, Ahmadu Bello University, Zaria, Nigeria. Activities on preventive or routine maintenance have been institutionalized since the commissioning of the reactor in February 2004. This has grossly reduced the rates of corrective maintenance activities and helped the reactor management a great deal in predicting failure rates of reactor components and other auxiliary units. Routine maintenance of systems and components are being carried out on a weekly, quarterly and annual basis based on manufacturer’s recommendations, which have been reviewed and improved over the years. The paper presents the implementation of maintenance activities in NIRR-1 from its initial criticality in 2004 till today and the new scheme for periodic testing and in-service-inspection developed after an IAEA Integrated Safety Assessment of Research Reactors mission. The measures put in place are envisaged to reduce the negative impact of ageing on NIRR-1 and its auxiliary systems. (author)

  13. Spatiotemporal patterns of particulate matter (PM and associations between PM and mortality in Shenzhen, China

    Directory of Open Access Journals (Sweden)

    Fengying Zhang

    2016-03-01

    Full Text Available Abstract Background Most studies on air pollution exposure and its associations with human health in China have focused on the heavily polluted industrial areas and/or mega-cities, and studies on cities with comparatively low air pollutant concentrations are still rare. Only a few studies have attempted to analyse particulate matter (PM for the vibrant economic centre Shenzhen in the Pearl River Delta. So far no systematic investigation of PM spatiotemporal patterns in Shenzhen has been undertaken and the understanding of pollution exposure in urban agglomerations with comparatively low pollution is still limited. Methods We analyze daily and hourly particulate matter concentrations and all-cause mortality during 2013 in Shenzhen, China. Temporal patterns of PM (PM2.5 and PM10 with aerodynamic diameters of 2.5 (10 μm or less (or less (including particles with a diameter that equals to 2.5 (10 μm are studied, along with the ratio of PM2.5 to PM10. Spatial distributions of PM10 and PM2.5 are addressed and associations of PM10 or PM2.5 and all-cause mortality are analyzed. Results Annual average PM10 and PM2.5 concentrations were 61.3 and 39.6 μg/m3 in 2013. PM2.5 failed to meet the Class 2 annual limit of the National Ambient Air Quality Standard. PM2.5 was the primary air pollutant, with 8.8 % of days having heavy PM2.5 pollution. The daily PM2.5/PM10 ratios were high. Hourly PM2.5 concentrations in the tourist area were lower than downtown throughout the day. PM10 and PM2.5 concentrations were higher in western parts of Shenzhen than in eastern parts. Excess risks in the number of all-cause mortality with a 10 μg/m3 increase of PM were 0.61 % (95 % confidence interval [CI]: 0.50–0.72 for PM10, and 0.69 % (95 % CI: 0.55–0.83 for PM2.5, respectively. The greatest ERs of PM10 and PM2.5 were in 2-day cumulative measures for the all-cause mortality, 2-day lag for females and the young (0–65 years, and L02 for males and the elder (>65

  14. Chemical composition and sources of PM1 and PM2.5 in Beijing in autumn.

    Science.gov (United States)

    Zhang, Yanyun; Lang, Jianlei; Cheng, Shuiyuan; Li, Shengyue; Zhou, Ying; Chen, Dongsheng; Zhang, Hanyu; Wang, Haiyan

    2018-02-20

    Beijing, the capital of China, suffers from severe atmospheric aerosol pollution; nevertheless, a comprehensive study of the constituents and sources of PM 1 is still lacking, and the differences between PM 1 and PM 2.5 are still unclear. In this study, an intensive observation was conducted to reveal the pollution characteristics of PM 1 and PM 2.5 in Beijing in autumn. Positive matrix factorization (PMF), backward trajectories and a potential source contribution function (PSCF) model were used to identify the source categories and source areas of PM 1 and PM 2.5 . The results showed that the average concentrations of PM 1 and PM 2.5 reached 78.20μg/m 3 and 95.47μg/m 3 during the study period, respectively. PM 1 contributed greatly to PM 2.5 . The PM 1 /PM 2.5 value increased from 73.6% to 90.1% with PM 1 concentration growing from 150μg/m 3 . Higher secondary inorganic aerosol (SIA) proportions (31.3%-70.8%) were found in PM 1 . The higher fraction of SIA, OC, EC and typical elements in PM 1 illustrated that anthropogenic components accumulated more in smaller size particles. Three typical weather patterns causing the heavy pollution in autumn were found as follows: (1) Siberian high and uniform high pressure field, (2) cold front and low-voltage system, and (3) uniform low pressure field. A PMF analysis indicated that secondary aerosols and coal combustion, vehicle, industry, biomass burning, and dust were the important sources of PM, accounting for 53.8%, 8.0%, 13.0%, 13.2% and 12.0% of PM 1 , respectively, and for 47.5%, 9.9%, 12.4%, 8.4% and 21.8% of PM 2.5 , respectively. The HYSPLIT and chemical components analysis indicated the potential contribution from biomass burning and fertilization ammonia emissions to PM 1 in autumn. The source areas were similar for PM 1 and PM 1-2.5 under general polluted conditions, but during the heavily polluted periods, the source areas were distributed in farther regions from Beijing for PM 1 than for PM 1-2.5 . Copyright

  15. Composition and sources of particles in Mannerheimintie during exceedance days of PM{sub 10} limit value in 2009; Hiukkasten koostumus ja laehteet Mannerheimintiellae PM{sub 10}-raja-arvon ylityspaeivinae 2009

    Energy Technology Data Exchange (ETDEWEB)

    Kupiainen, K.; Stojiljkovic, A.; Ritola, R. (Nordic Envicon Oy, Helsinki (Finland))

    2011-06-15

    The purpose of the work was to determine sources of thoracic particles (PM{sub 10}) in the center of Helsinki, in Mannerheimintie, in 2009 during the days when the daily average concentration of PM{sub 10} exceeded 50 mug/m3. Work was commissioned by the Helsinki City Public Works department, the Helsinki Environment Centre and the Helsinki Region Environmental Services Authority HSY (formerly YTV). By the end of the year there were altogether 30 exceedance days. The allowed number of exceedance days per year is 35, so the limit value was not exceeded in 2009. HSY is responsible for monitoring the air quality in the Helsinki metropolitan area. The PM{sub 10} monitoring data in combination with electron microscopy based single particle compositional analysis and receptor modeling was used to evaluate dust source contributions on the exceedance days at HSY's air quality monitoring station in Mannerheimintie. Dust sources related to traction control (winter maintenance and pavement wear by studded tyres) contributed most to the PM{sub 10} concentrations in Mannerheimintie. On 12 exceeding days this group accounted for more than 50 % of PM{sub 10} particles, on 3 days the group alone was sufficient to cause the exceedance. On 3 of the exceedance days long-range transboundary air pollution or traffic exhaust emissions were on the same level with the traction control sources. On 11 days the most significant impact came from construction sites. (orig.)

  16. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1997-01-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  17. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  18. Partitioning of magnetic particles in PM10, PM2.5 and PM1 aerosols in the urban atmosphere of Barcelona (Spain).

    Science.gov (United States)

    Revuelta, María Aránzazu; McIntosh, Gregg; Pey, Jorge; Pérez, Noemi; Querol, Xavier; Alastuey, Andrés

    2014-05-01

    A combined magnetic-chemical study of 15 daily, simultaneous PM10-PM2.5-PM1 urban background aerosol samples has been carried out. The magnetic properties are dominated by non-stoichiometric magnetite, with highest concentrations seen in PM10. Low temperature magnetic analyses showed that the superparamagnetic fraction is more abundant when coarse, multidomain particles are present, confirming that they may occur as an oxidized outer shell around coarser grains. A strong association of the magnetic parameters with a vehicular PM10 source has been identified. Strong correlations found with Cu and Sb suggests that this association is related to brake abrasion emissions rather than exhaust emissions. For PM1 the magnetic remanence parameters are more strongly associated with crustal sources. Two crustal sources are identified in PM1, one of which is of North African origin. The magnetic particles are related to this source and so may be used to distinguish North African dust from other sources in PM1. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  20. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    For offshore wind turbines, maintenance costs are substantial due to a large number of component failures. In addition to the repair costs, equipment costs and lost production costs are large due to limited accessibility to the turbines. In order to reduce the costs, preventive methods can be used......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... maintenance costs, and many studies have also been published for preventive maintenance. However, an important part is the modeling of the relationship between maintenance and reliability, which is typically not modeled in a consistent way. Therefore, the methods cannot be used directly for optimal...

  1. Analysis of Particulate matter (PM 10 and PM 2.5 concentration in Khorramabad city

    Directory of Open Access Journals (Sweden)

    Seyed Hamed Mirhosseini

    2013-01-01

    Full Text Available Aims: In this study, the concentration of PM10 and PM2.5 in eight station of Khorramabad city was analyzed. Materials and Methods: For this study, the data were taken from April 2010 to March 2011. The eight sampling point were chosen in account to Khorramabad maps. During this period, 240 daily PM samples including coarse particle (PM 10 and fine particle (PM 2.5 were collected. A two-part sampler was used to collect samples of PM. According to one-way ANOVA, multiple comparisons Scheffe, the obtained data were analyzed and then compared with the Environment protection organization standard rates. Khorramabad Results: The results revealed that during measuring the maximum concentration of PM 10 and PM 2.5 was respectively 120.9 and 101.09 μ/m 3 at Shamshirabad station. There was a significant difference between the mean values of PM 10 concentration (μg/m 3 in the seasons of summer. In addition, the mean concentrations of PM 10 in warmer months exceeded to the maximum permissible concentration. Conclusions: Year comparison of PM 10 and PM 2.5 concentration with standard were revealed particle matter concentration in summer season was higher than standard. Although total mean of particle matter was less than standard concentration.

  2. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  3. Multi-level predictive maintenance for multi-component systems

    International Nuclear Information System (INIS)

    Nguyen, Kim-Anh; Do, Phuc; Grall, Antoine

    2015-01-01

    In this paper, a novel predictive maintenance policy with multi-level decision-making is proposed for multi-component system with complex structure. The main idea is to propose a decision-making process considered on two levels: system level and component one. The goal of the decision rules at the system level is to address if preventive maintenance actions are needed regarding the predictive reliability of the system. At component level the decision rules aim at identifying optimally a group of several components to be preventively maintained when preventive maintenance is trigged due to the system level decision. Selecting optimal components is based on a cost-based group improvement factor taking into account the predictive reliability of the components, the economic dependencies as well as the location of the components in the system. Moreover, a cost model is developed to find the optimal maintenance decision variables. A 14-component system is finally introduced to illustrate the use and the performance of the proposed predictive maintenance policy. Different sensitivity analysis are also investigated and discussed. Indeed, the proposed policy provides more flexibility in maintenance decision-making for complex structure systems, hence leading to significant profits in terms of maintenance cost when compared with existing policies. - Highlights: • A predictive maintenance policy for complex structure systems is proposed. • Multi-level decision process based on prognostic results is proposed. • A cost-based group importance measure is introduced for decision-making. • Both positive and negative dependencies between components are investigated. • A cost model and Monte Carlo simulation are developed for optimization process.

  4. Application of reliability centered maintenance to Embalse NPP

    International Nuclear Information System (INIS)

    Torres, Antonio; Perdomo, Manuel; Fornero, Damian; Corchera, Roberto

    2010-01-01

    One of the most recent applications of Probabilistic Safety Analysis to Embalse NPP is the Safety Oriented Maintenance Program developed through the Reliability Centered Maintenance (RCM) methodology. Such an application was carried out by a cooperated effort between the staff of nuclear safety department of NPP and experts from Instituto Superior de Tecnologias y Ciencias Aplicadas of Cuba. So far 6 technological systems have been analyzed with important results regarding the optimization of preventive and predictive maintenance program of those systems. Any tasks of RCM were automated via MOSEG code. The results of this study were focused on the elaboration and modification of the Preventive Program, prioritization of stocks, reorientation of predictive techniques and modification in the time parameters of maintenance. (author)

  5. Contributions of citrate in redox potential maintenance and ATP production: metabolic pathways and their regulation in Lactobacillus panis PM1.

    Science.gov (United States)

    Kang, Tae Sun; Korber, Darren R; Tanaka, Takuji

    2013-10-01

    Lactobacillus panis PM1 belongs to the group III heterofermentative lactobacilli and can utilize various NADH-reoxidizing routes (e.g., citrate, glycerol, and oxygen) according to environmental conditions. In this study, we investigated the ability of L. panis PM1 to produce succinate, acetate, and lactate via citrate utilization. Possible pathways, as well as regulation, for citrate metabolism were examined on the basis of the genome sequence data and metabolic profiles of L. panis PM1. The presence of citrate led to the up-regulation, at the transcriptional level, of the genes encoding for citrate lyase, malate dehydrogenase, and malic enzyme of the citrate pathways by 10- to 120-fold. The transcriptional regulator of the dha operon coding for glycerol dehydratase of L. panis PM1 repressed the expression of the citrate lyase gene (10-fold). Metabolite analyses indicated that the transcriptional enhancement by citrate stimulated succinate yield. Citrate metabolism contributed to energy production by providing a major alternate pathway for NAD(+) regeneration and allowed acetyl phosphate to yield acetate/ATP instead of ethanol/NAD(+). Additionally, a branching pathway from oxaloacetate to pyruvate increased the pool of lactate, which was then used to produce ATP during stationary phase. However, the redirection of NADH-to-citrate utilization resulted in stress caused by end-products (i.e., succinate and acetate). This stress reduced succinate production by up to 50 % but did not cause significant changes at transcriptional level. Overall, citrate utilization was beneficial for the growth of L. panis PM1 by providing a NAD(+) regeneration route and producing extra ATP.

  6. Gentilly 2 maintenance in a total quality environment

    Energy Technology Data Exchange (ETDEWEB)

    Ross, M H; Marois, H [Hydro-Quebec, Gentilly (Canada). Gentilly Generating Station

    1993-12-31

    Comprehensive preventive maintenance programs at Gentilly-2 Nuclear Generating Station are based on a policy that seeks to balance requirements against resources. A commitment to total quality aims at performance improvement and total customer satisfaction. To improve overall performance to an annual availability factor of 90%, planned outages must be limited to 21 days per year, and the preventive maintenance program must be upgraded. A quality improvement team is involved in supporting this initiative. This team will seek to bring a new balance to the program, and eventually optimize it, using reliability-centred maintenance techniques. 24 figs.

  7. The installations maintenance control using SAP R/3; O controle de manutencao de instalacoes utilizando o SAP R/3

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Robison Tirre; Pereira, Paulo Manoel Borges; Jorge, Kemal Vieira [Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    TBG (Transportadora Brasileira Gasoduto Bolivia Brasil S.A.) began their operations in 1999 and since the beginning the SAP R/3 PM module (Plant Maintenance) is used for the control of the maintenance activities and to manager the Master Maintenance and Inspection Plans. On these five years, a series of reports and SAP functionalities were developed or configured to adapt the system R/3 to the needs of TBG maintenance. Now, the whole management and control of the surface facilities maintenance (compression station, city gate, measurement station, etc) is accomplished by SAP R/3 system. (author)

  8. Game-Theoretic Models for Usage-based Maintenance Contract

    Science.gov (United States)

    Husniah, H.; Wangsaputra, R.; Cakravastia, A.; Iskandar, B. P.

    2018-03-01

    A usage-based maintenance contracts with coordination and non coordination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the owner will be charged an additional cost. In general, the agent (Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. The decision problem for the owner is to select the best option offered that fits to its requirement, and the decision problem for the agent is to find the optimal maintenance efforts for a given price of the service option offered. We first find the optimal decisions using coordination scheme and then with non coordination scheme for both parties.

  9. Investigation of Air Quality Index and PM10 and PM2.5 in Arak

    Directory of Open Access Journals (Sweden)

    Fatemeh Fazelinia

    2013-12-01

    Full Text Available Background and purpose: In this study, the air quality index and concentration of particles such as PM10 and PM2.5 were investigated in Arak. Materials and Methods: To determine the concentration of PM10 and PM2.5, 60 samples were collected by laser TSI model 8520 in summer and winter 2012. The collection site was around Arak city center. Results: during the sampling period, as a matter of PM10, the cleanest and the most polluted month were December and June with the average of 34.33 µg m-3 and 100.1 µg m-3, respectively. The concentration of PM2.5 was 12.93 and 53.17 µg m-3 for December and June, respectively. Meanwhile, in terms of air quality index (AQI, in 98.3% and 70% of cases, the concentrations of PM10 and PM2.5, respectively were less than normal (AQI100. Conclusion: The concentration of PM10 in the study period was less than Environmental Protection Agency (EPA 2006 guideline. Meanwhile, the concentrations of PM2.5 in 30% of air samples were greater than EPA guideline. The average PM2.5/PM10 ratio during the sampling period was 0.41 compared to range 0.15 to 0.25 reported by EPA.

  10. Initiating statistical maintenance optimization

    International Nuclear Information System (INIS)

    Doyle, E. Kevin; Tuomi, Vesa; Rowley, Ian

    2007-01-01

    Since the 1980 s maintenance optimization has been centered around various formulations of Reliability Centered Maintenance (RCM). Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy includes evaluation of statistical optimization techniques. A review of successful pilot efforts in this direction is provided as well as initial work with graphical analysis. The present situation reguarding data sourcing, the principle impediment to use of stochastic methods in previous years, is discussed. The use of Crowe/AMSAA (Army Materials Systems Analysis Activity) plots is demonstrated from the point of view of justifying expenditures in optimization efforts. (author)

  11. Characterization of PAHs and metals in indoor/outdoor PM10/PM2.5/PM1 in a retirement home and a school dormitory.

    Science.gov (United States)

    Hassanvand, Mohammad Sadegh; Naddafi, Kazem; Faridi, Sasan; Nabizadeh, Ramin; Sowlat, Mohammad Hossein; Momeniha, Fatemeh; Gholampour, Akbar; Arhami, Mohammad; Kashani, Homa; Zare, Ahad; Niazi, Sadegh; Rastkari, Noushin; Nazmara, Shahrokh; Ghani, Maryam; Yunesian, Masud

    2015-09-15

    In the present work, we investigated the characteristics of polycyclic aromatic hydrocarbons (PAHs) and metal(loid)s in indoor/outdoor PM10, PM2.5, and PM1 in a retirement home and a school dormitory in Tehran from May 2012 to May 2013. The results indicated that the annual levels of indoor and outdoor PM10 and PM2.5 were much higher than the guidelines issued by the World Health Organization (WHO). The most abundant detected metal(loid)s in PM were Si, Fe, Zn, Al, and Pb. We found higher percentages of metal(loid)s in smaller size fractions of PM. Additionally, the results showed that the total PAHs (ƩPAHs) bound to PM were predominantly (83-88%) found in PM2.5, which can penetrate deep into the alveolar regions of the lungs. In general, carcinogenic PAHs accounted for 40-47% of the total PAHs concentrations; furthermore, the smaller the particle size, the higher the percentage of carcinogenic PAHs. The percentages of trace metal(loid)s and carcinogenic PAHs in PM2.5 mass were almost twice as high as those in PM10. This can most likely be responsible for the fact that PM2.5 can cause more adverse health effects than PM10 can. The average BaP-equivalent carcinogenic (BaP-TEQ) levels both indoors and outdoors considerably exceeded the maximum permissible risk level of 1 ng/m(3) of BaP. The enrichment factors and diagnostic ratios indicated that combustion-related anthropogenic sources, such as gasoline- and diesel-fueled vehicles as well as natural gas combustion, were the major sources of PAHs and trace metal(loid)s bound to PM. Copyright © 2015 Elsevier B.V. All rights reserved.

  12. An expert system for spare parts inventory control

    International Nuclear Information System (INIS)

    Kim, K.Y.; Chen, P.Y.C.; Okrent, D.

    1987-01-01

    This paper describes an expert system which can handle spare part requirements not only in corrective maintenance (CM) or preventive maintenance (PM), but also when failure rates of components or parts are updated by new data or by predictive maintenance (PDM), and which can also decide optimum stocking level of each spare part. This expert system provides a maintenance (or inventory) manager with an improved basis for decision making in the maintenance related to spare parts. The definitions of PM and PDM from NUREG-1212 (USNRC 1986) are used herein. This expert system used Intellignece/Compiler (Intelligence Ware, 1986) as a language/tool in the IBM-PC

  13. The Concentrations and Reduction of Airborne Particulate Matter (PM10, PM2.5, PM1 at Shelterbelt Site in Beijing

    Directory of Open Access Journals (Sweden)

    Jungang Chen

    2015-05-01

    Full Text Available Particulate matter is a serious source of air pollution in urban areas, where it exerts adverse effects on human health. This article focuses on the study of subduction of shelterbelts for atmospheric particulates. The results suggest that (1 the PM mass concentration is higher in the morning or both morning and noon inside the shelterbelts and lower mass concentrations at other times; (2 the particle mass concentration inside shelterbelt is higher than outside; (3 the particle interception efficiency of the two forest belts over the three months in descending order was PM10 > PM1 > PM2.5; and (4 the two shelterbelts captured air pollutants at rates of 1496.285 and 909.075 kg/month and the major atmospheric pollutant in Beijing city is PM10. Future research directions are to study PM mass concentration variation of shelterbelt with different tree species and different configuration.

  14. Increases in wintertime PM2.5 sodium and chloride linked to snowfall and road salt application

    Science.gov (United States)

    Kolesar, Katheryn R.; Mattson, Claire N.; Peterson, Peter K.; May, Nathaniel W.; Prendergast, Rashad K.; Pratt, Kerri A.

    2018-03-01

    The application of salts and salty brines to roads is common practice during the winter in many urban environments. Road salts can become aerosolized, thereby injecting sodium and chloride particulate matter (PM) into the atmosphere. Here, data from the United States Environmental Protection Agency Chemical Speciation Monitoring Network were used to assess temporal trends of sodium and chloride PM2.5 (PM road salt aerosols. Sodium and chloride PM2.5 concentrations were an average of three times higher in the winter, as compared to the summer, for locations with greater than 25 cm of average annual snowfall. Winter urban chloride PM2.5 concentrations attributed to road salt can even sometimes rival those of coastal sea spray aerosol-influenced sites. In most snow-influenced cities, chloride and sodium PM2.5 concentrations were positively correlated with snowfall; however, this relationship is complicated by differences in state and local winter maintenance practices. This study highlights the ubiquity of road salt aerosols in the United States and their potential impact on wintertime urban air quality, particularly due to the potential for multiphase reactions to liberate chlorine from the particle-phase. Since road salt application is a common practice in wintertime urban environments across the world, it is imperative that road salt application emissions, currently not included in inventories, and its impacts be investigated through measurements and modeling.

  15. LHCb: Observation of CP violation in $B^{\\pm} \\to D^0 K^{\\pm}$ decays at LHCb

    CERN Multimedia

    Johnson, Daniel

    2012-01-01

    An analysis of $B^\\pm \\to DK^\\pm$ and $B^\\pm \\to D\\pi^\\pm$ decays is presented where the D meson is reconstructed in the two-body final states: $K^\\pm \\pi^\\mp$, $K^+K^−$ and $\\pi^+\\pi^-$. Using 1.0 fb$^{−1}$ of LHCb data, measurements of several observables are made including the first observation of the suppressed mode $B^\\pm \\to [\\pi^\\pm K^\\mp] DK^\\pm$. CP violation in $B^\\pm \\to DK^\\pm$ decays is observed with $5.8\\sigma$ significance. We also comment on the prospects for similar measurements using different final states.

  16. Development of a continuous monitoring system for PM10 and components of PM2.5.

    Science.gov (United States)

    Lippmann, M; Xiong, J Q; Li, W

    2000-01-01

    While particulate matter with aerodynamic diameters below 10 and 2.5 microns (PM10 and PM2.5) correlate with excess mortality and morbidity, there is evidence for still closer epidemiological associations with sulfate ion, and experimental exposure-response studies suggest that the hydrogen ion and ultrafine (PM0.15) concentrations may be important risk factors. Also, there are measurement artifacts in current methods used to measure ambient PM10 and PM2.5, including negative artifacts because of losses of sampled semivolatile components (ammonium nitrate and some organics) and positive artifacts due to particle-bound water. To study such issues, we are developing a semi-continuous monitoring system for PM10, PM2.5, semivolatiles (organic compounds and NH4NO3), particle-bound water, and other PM2.5 constituents that may be causal factors. PM10 is aerodynamically sorted into three size-fractions: (1) coarse (PM10-PM2.5); (2) accumulation mode (PM2.5-PM0.15); and (3) ultrafine (PM0.15). The mass concentration of each fraction is measured in terms of the linear relation between accumulated mass and pressure drop on polycarbonate pore filters. The PM0.15 mass, being highly correlated with the ultrafine number concentration, provides a good index of the total number concentration in ambient air. For the accumulation mode (PM2.5-PM0.15), which contains nearly all of the semivolatiles and particle-bound water by mass, aliquots of the aerosol stream flow into system components that continuously monitor sulfur (by flame photometry), ammonium and nitrate (by chemiluminescence following catalytic transformations to NO), organics (by thermal-optical analysis) and particle-bound water (by electrolytic hygrometer after vacuum evaporation of sampled particles). The concentration of H+ can be calculated (by ion balance using the monitoring data on NO3-, NH4+, and SO4=).

  17. Maintenance of the Hanford cone penetrometer platform during fiscal year 1999

    International Nuclear Information System (INIS)

    IWATATE, D.F.

    1998-01-01

    This SOW describes services requested of Applied Research and Associates, Inc. (ARA), as a commercial provider of cone penetrometer equipment and services, to provide routine inspection and minimum preventive maintenance on the Hanford CP Platform (CPP) during Fiscal Year 1999. This SOW specifically pertains to the maintenance of the CPP and associated support equipment and is limited in scope to routine preventive maintenance and identification of any deficiencies. ARA is the original manufacturer of the CPP and will conduct this work following the vendor-prepared maintenance schedule

  18. Effects of 1,25-Dihydroxyvitamin D3 on the Prevention of Chronic Obstructive Pulmonary Disease (COPD) in Rats Exposed to Air Pollutant Particles Less than 2.5 Micrometers in Diameter (PM2.5).

    Science.gov (United States)

    Chen, Lerong; Yuan, Xiaolan; Zou, Luru; Peng, Jianping; Hu, Xinchun

    2018-01-18

    BACKGROUND This study aimed to investigate the effects of 1,25-dihydroxyvitamin D3 (1,25(OH)2D3) on airway changes in chronic obstructive pulmonary disease (COPD) rats exposed to air pollutant particles less than 2.5 micrometers in diameter (PM2.5), and to evaluate the mechanisms. MATERIAL AND METHODS Three groups were included in this study: a normal group, a COPD model group, and a COPD with 1,25(OH)2D3 treatment group. In each group, the rats were divided into four subgroups: control and different doses of PM2.5 (1.6, 8 and 40 mg/kg body weight). Apoptosis in lung tissue was detected by terminal deoxynucleotidyl transferase dUTP nick end labeling (TUNEL). The expression of c-Jun N-terminal kinase 1 (JNK1) and mucin 5AC (MUC5AC) were detected by real-time polymerase chain reaction (RT-PCR), Western blotting and immunofluorescence staining. RESULTS Compared with corresponding subgroups in normal group, the apoptotic rates in COPD group were significantly increased. By contrast, 1,25(OH)2D3 treatment group significantly reduced COPD-induced apoptosis in lung tissue. Upon the dose increase of PM2.5, the apoptotic rate was also elevated in each group. Compared with the corresponding control in each group, PM2.5 increased apoptosis in a dose-dependent manner. Importantly, 1,25(OH)2D3 also prevented apoptosis in COPD rats exposed to PM2.5. Mechanically, the expression of MUC5AC and JNK1 in COPD group was significantly upregulated, compared with corresponding subgroups in the normal group. Treatment with 1,25(OH)2D3 reduced expression of MUC5AC and JNK1 in COPD rats. It was found that the expression of MUC5AC and JNK1 was elevated with the dose increase of PM2.5 in each group. Consistently, 1,25(OH)2D3 also reduced the expression of MUC5AC and JNK1 in COPD rats exposed to PM2.5. CONCLUSIONS 1,25(OH)2D3 prevented lung injury in COPD rats with or without PM2.5 exposure. Our results suggest that 1,25(OH)2D3 is useful to mitigate the injury caused by COPD.

  19. Photovoltaic power plants maintenance; El mantenimiento en plantas fotovoltaicas

    Energy Technology Data Exchange (ETDEWEB)

    Suanzes, F.; Rodelgo, I.

    2010-07-01

    It is reviewed the evolution of the maintenance contracts in solar facilities in a young environment and with a large projection. Thus, is described the preventive maintenance in this kind of facilities, and are also analyzed the most relevant cases of corrective maintenance. (Author)

  20. A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Ejlertsen, Lena Secher

    2017-01-01

    A railway signaling system is a complex and interdependent system which should ensure the safe operation of trains. We introduce and address a mixed integer optimisation model for the preventive signal maintenance crew scheduling problem in the Danish railway system. The problem contains many...... to feed as ‘warm start’ solutions to a Mixed Integer Programming (MIP) solver for further optimisation. We apply the CP/MIP framework to a section of the Danish rail network and benchmark our results against both direct application of a MIP solver and modelling the problem as a Constraint Optimisation...

  1. Predictive Maintenance--An Effective Money Saving Tool Being Applied in Industry Today.

    Science.gov (United States)

    Smyth, Tom

    2000-01-01

    Looks at preventive/predictive maintenance as it is used in industry. Discusses core preventive maintenance tools that must be understood to prepare students. Includes a list of websites related to the topic. (JOW)

  2. Variations of PM2.5, PM10 mass concentration and health assessment in Islamabad, Pakistan

    Science.gov (United States)

    Memhood, Tariq; Tianle, Z.; Ahmad, I.; Li, X.; Shen, F.; Akram, W.; Dong, L.

    2018-04-01

    Sparse information appears in lack of awareness among the people regarding the linkage between particulate matter (PM) and mortality in Pakistan. The current study is aimed to investigate the seasonal mass concentration level of PM2.5 and PM10 in ambient air of Islamabad to assess the health risk of PM pollution. The sampling was carried out with two parallel medium volume air samplers on Whatman 47 mm quartz filter at a flow rate of 100L/min. Mass concentration was obtained by gravimetric analysis. A noticeable seasonal change in PM10 and PM2.5 mass concentration was observed. In case of PM2.5, the winter was a most polluted and spring was the cleanest season of 2017 in Islamabad with 69.97 and 40.44 μgm‑3 mean concentration. Contrary, highest (152.42 μgm‑3) and lowest (74.90 μgm‑3) PM10 mass concentration was observed in autumn and summer respectively. Air Quality index level for PM2.5 and PM10 was remained moderated to unhealthy and good to sensitive respectively. Regarding health risk assessment, using national data for mortality rates, the excess mortality due to PM2.5 and PM10 exposure has been calculated and amounts to over 198 and 98 deaths annually for Islamabad. Comparatively estimated lifetime risk for PM2.5 (1.16×10-6) was observed higher than PM10 (7.32×10-8).

  3. PM1-Alpha ELISA: the assay of choice for the detection of anti-PM/Scl autoantibodies?

    Science.gov (United States)

    Mahler, Michael; Fritzler, Marvin J

    2009-03-01

    A characteristic serological feature of patients suffering from the overlap polymyositis and scleroderma (PM/Scl) syndrome are antibodies to the human counterpart of the yeast exosome referred to as the PM/Scl complex. Historically, the detection of anti-PM/Scl antibodies was laborious and relied largely on indirect immunofluorescence and immunodiffusion techniques. In 1992 the major autoantigen PM/Scl-100 was identified and cloned. Subsequently, the major epitopes were mapped and one of these, termed PM1-Alpha, became the antigen for a novel ELISA exhibiting high sensitivity and specificity for the detection of anti-PM/Scl antibodies. Comparative studies with other methods using other PM/Scl autoantigens have shown that the PM1-Alpha ELISA has higher sensitivity and specificity than assays that employed recombinant PM/Scl-75c and PM/Scl-100. Anti-PM1-Alpha antibodies were identified in 55.0% of sera from PM/Scl overlap syndrome patients, but were also seen in 7.9% of SSc and in 7.5% of PM patients. The frequency in other systemic autoimmune diseases and in infectious diseases was significant lower. In summary, the data derived from individual studies suggest that PM1-Alpha may become the "gold standard" for the detection of anti-PM/Scl antibodies.

  4. Evaluation of the adequacy of maintenance tasks using the failure consequences of railroad vehicles

    International Nuclear Information System (INIS)

    Kim, Jaehoon; Jeong, Hyun- Yong

    2013-01-01

    The purpose of this study is to improve the efficiency, reliability and safety related to railroad maintenance tasks through an evaluation of the consequences of failures. The brake system was selected based on the failure data obtained from railroad vehicles in operation as one of the safety systems in railroad vehicles. The failure causes, failure effects, and the criticality of the failure mode were drawn for 62 failure modes of the braking system through the use of an FMECA for the 30 sub-devices having primary functions. The various maintenance tasks for the braking system were categorized into the 62 failure modes and failure consequences using the FMECA and the logic of maintenance decisions. Braking systems manufactured by the same manufacturer and operated by two different operators were studied in an effort to analyze preventive maintenance and to evaluate the adequacy of preventive maintenance tasks for the 62 failure modes. Based on results of the evaluation of these preventive maintenance tasks, new maintenance tasks were proposed, and concrete cost-cutting effects were determined from the calculation of the maintenance time and expected costs, using a preventive maintenance template developed specifically for railroad vehicles

  5. Development Of An Optimal Planning And Maintenance System A Case Study Of Shell Petroleum Development Company Obigbo Node

    Directory of Open Access Journals (Sweden)

    Temple Temple Amachree

    2017-08-01

    Full Text Available Preventive and breakdown maintenance system for a gas compressor plant were analyzed and appraised using established maintenance tools. To determine this comparative cost benefit analysis of preventive and breakdown maintenance activities on Agbada gas compressor plant of the Shell Petroleum Development Company was carried out. The cost of achieving 20000 run hours overhaul preventive maintenance with some disused repaired parts was analyzed and compared with the cost of carrying out the same activity with all new parts. Comparative studies showed that carrying out preventive maintenance with repairable parts which were recovered in the as new state is more cost effective than using all new parts. A cost saving of 14.63 was achieved. The same trend was also observed when the cost benefit analysis was carried out in breakdown maintenance option. This again gave a cost savings of 7.51 when repaired disused parts were used. The results showed that the rate of return on investment if breakdown maintenance is adopted is 24 as compared to the rate of return 01 26 that was obtained when preventive maintenance system was used. An NPV of N6703491725.00 and N5371346424.00 were obtained for preventive maintenance and breakdown maintenance respectively. It is therefore observed that preventive maintenance system strategy presented a better NPV over breakdown maintenance.

  6. Validation of PM6 & PM7 semiempirical methods on polarizability calculations

    Science.gov (United States)

    Praveen, P. A.; Babu, R. Ramesh; Ramamurthi, K.

    2015-06-01

    Modern semiempirical methods such as PM6 and PM7 are often used to explore the electronic structure dependent properties of molecules. In this work we report the evaluation of PM6 and PM7 methods towards linear and nonlinear optical polarizability calculations for different molecules and solid nanoclusters. The results are compared with reported experimental results as well as theoretical results from other high level theories for the same systems. It is found that both methods produce accurate results for small molecules and the accuracy increases with the increase in asymmetry of the medium sized organic molecules and accuracy reduces for solid nanoclusters.

  7. Validation of PM6 & PM7 semiempirical methods on polarizability calculations

    Energy Technology Data Exchange (ETDEWEB)

    Praveen, P. A.; Babu, R. Ramesh, E-mail: rampap2k@yahoo.co.in [Crystal Growth and Thin film Laboratory, Department of Physics, Bharathidasan University, Tiruchirappalli-620024, Tamilnadu (India); Ramamurthi, K. [Department of Physics and Nanotechnology, Faculty of Engineering and Technology, SRM University, Kattankulathur – 603 203, Tamil Nadu (India)

    2015-06-24

    Modern semiempirical methods such as PM6 and PM7 are often used to explore the electronic structure dependent properties of molecules. In this work we report the evaluation of PM6 and PM7 methods towards linear and nonlinear optical polarizability calculations for different molecules and solid nanoclusters. The results are compared with reported experimental results as well as theoretical results from other high level theories for the same systems. It is found that both methods produce accurate results for small molecules and the accuracy increases with the increase in asymmetry of the medium sized organic molecules and accuracy reduces for solid nanoclusters.

  8. Validation of PM6 & PM7 semiempirical methods on polarizability calculations

    International Nuclear Information System (INIS)

    Praveen, P. A.; Babu, R. Ramesh; Ramamurthi, K.

    2015-01-01

    Modern semiempirical methods such as PM6 and PM7 are often used to explore the electronic structure dependent properties of molecules. In this work we report the evaluation of PM6 and PM7 methods towards linear and nonlinear optical polarizability calculations for different molecules and solid nanoclusters. The results are compared with reported experimental results as well as theoretical results from other high level theories for the same systems. It is found that both methods produce accurate results for small molecules and the accuracy increases with the increase in asymmetry of the medium sized organic molecules and accuracy reduces for solid nanoclusters

  9. A multivariate study for characterizing particulate matter (PM(10), PM(2.5), and PM(1)) in Seoul metropolitan subway stations, Korea.

    Science.gov (United States)

    Kwon, Soon-Bark; Jeong, Wootae; Park, Duckshin; Kim, Ki-Tae; Cho, Kyung Hwa

    2015-10-30

    Given that around eight million commuters use the Seoul Metropolitan Subway (SMS) each day, the indoor air quality (IAQ) of its stations has attracted much public attention. We have monitored the concentration of particulate matters (PMx) (i.e., PM10, PM2.5, and PM1) in six major transfer stations per minute for three weeks during the summer, autumn, and winter in 2014 and 2015. The data were analyzed to investigate the relationship between PMx concentration and multivariate environmental factors using statistical methods. The average PM concentration observed was approximately two or three times higher than outdoor PM10 concentration, showing similar temporal patterns at concourses and platforms. This implies that outdoor PM10 is the most significant factor in controlling indoor PM concentration. In addition, the station depth and number of trains passing through stations were found to be additional influences on PMx. Principal component analysis (PCA) and self-organizing map (SOM) were employed, through which we found that the number of trains influences PM concentration in the vicinity of platforms only, and PMx hotspots were determined. This study identifies the external and internal factors affecting PMx characteristics in six SMS stations, which can assist in the development of effective IAQ management plans to improve public health. Copyright © 2015 Elsevier B.V. All rights reserved.

  10. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    Morrison, J.F.

    1992-01-01

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  11. CARDIOVASCULAR MORTALITY IN PHOENIX: PM1 IS A BETTER INDICATOR THAN PM2.5.

    Science.gov (United States)

    EPA has obtained a 3-year database of particulate matter (PM) in Phoenix, AZ from 1995 - 1997 that includes elemental analysis by XRF of daily PM2.5. During this time period PM1 and PM2.5 TEOMs were run simultaneously for about 7 months during two periods of the year. Regressio...

  12. The practice and earnings of preventive medicine physicians.

    Science.gov (United States)

    Salive, M E

    1992-01-01

    A shortage of preventive medicine (PM) physicians exists in the United States. Researchers know little about these physicians' earnings and practice characteristics. The American College of Preventive Medicine (ACPM) mailed a survey to all self-identified PM physicians on the American Medical Association (AMA) Physician Masterfile. A total of 3,771 (54%) responded; respondents' sex and region of residence were typical for PM physicians in general, with a slight excess of older physicians and those reporting board certification. A total of 2,664 (71%) were working full time, with median earnings of $85,000 (mean $90,000). Among full-time physicians, relatively higher earnings were associated with the following characteristics: male sex; age 45 to 64 years; major source of income from clinical, business, or industrial sources, rather than governmental or academic; and PM board certification. Full-time PM physicians earned much less than office-based private practitioners in several primary care specialties in 1989. The gap in earnings between PM specialists in government positions and those in the private sector is also substantial. Both disparities may require creative solutions.

  13. Report of testing and sampling of municipal supply well PM-4

    International Nuclear Information System (INIS)

    Koch, Richard J.; Longmire, Patrick; Rogers, David B.; Mullen, Ken

    1999-01-01

    During drilling of regional aquifer characterization borehole R-25, located in the western part of Los Alamos National Laboratory (LANL) at Technical Area (TA) 16, groundwater samples were collected from perched zones of saturation and the regional aquifer that contained elevated levels of high explosive (HE) compounds. One of the nearest Los Alamos County municipal supply wells potentially located down gradient from borehole R-25 is PM-4, located on Mesita del Buey at the west end of TA-54. During the winter of 1998 and 1999 the pump in PM-4 had been removed from the well for scheduled maintenance by the Los Alamos County Public Utilities Department (PUD). Because the pump was removed from PM-4, the opportunity existed to enter the well to (1) perform tests to determine where within the regional aquifer groundwater entered the well and (2) collect groundwater samples from the producing zones for analyses to determine if HE contaminants were present in discrete zones within the regional aquifer. The report of the activities that were performed during March 1999 for the testing and sampling of municipal supply well PM-4 is provided. The report provides a description of the field activities associated with the two phases of the project, including (1) the results of the static and dynamic spinner log surveys, and (2) a description of the sampling activities and the field-measured groundwater quality parameters that were obtained during sampling activities. This report also provides the analytical results of the groundwater samples and a brief discussion of the results of the project

  14. Chemical characteristics and influence of continental outflow on PM1.0, PM2.5 and PM10 measured at Tuoji island in the Bohai Sea.

    Science.gov (United States)

    Zhang, Junmei; Yang, Lingxiao; Mellouki, Abdelwahid; Wen, Liang; Yang, Yumeng; Gao, Ying; Jiang, Pan; Li, Yanyan; Wang, Wenxing

    2016-12-15

    To investigate the chemical characteristics and sources of size-segregated particles in the background region, PM 1.0 , PM 2.5 and PM 10 samples were collected in Tuoji Island (TI) during the winter of 2014. Water-soluble inorganic ions (WSIIs) including Na + , NH 4 + , K + , Mg 2+ , Ca 2+ , Cl - , NO 3 - and SO 4 2- , organic carbon (OC) and elemental carbon (EC) and water-soluble organic carbon (WSOC) were analysed. The average mass concentrations of PM 1.0 , PM 2.5 and PM 10 were 44.5μg/m 3 , 62.0μg/m 3 and 94.4μg/m 3 , respectively, and particles were importantly enriched in PM 1.0 . Secondary WSIIs (NH 4 + , NO 3 - and SO 4 2- ) were the most abundant species, and their contribution was highest in PM 1.0 . The average values of NOR and SOR were more than 0.1 in PM 1.0 , suggesting that secondary formation of SO 4 2- and NO 3 - from the gas precursors SO 2 and NO 2 occurred in PM 1.0 . Secondary organic carbon accounted for 62.3% in PM 1.0 , 61.9% in PM 1.0-2.5 and 48.9% in PM 2.5-10 of OC, formed mainly in the fine mode. The particles concentrations were mainly affected by air mass from the North China Plain, especially the air mass from the southwest of Shandong province, which had low speed and altitude. Copyright © 2016 Elsevier B.V. All rights reserved.

  15. Hospital indoor PM10/PM2.5 and associated trace elements in Guangzhou, China

    International Nuclear Information System (INIS)

    Wang Xinhua; Bi Xinhui; Sheng Guoying; Fu Jiamo

    2006-01-01

    PM10 and PM2.5 samples were collected in the indoor environments of four hospitals and their adjacent outdoor environments in Guangzhou, China during the summertime. The concentrations of 18 target elements in particles were also quantified. The results showed that indoor PM2.5 levels with an average of 99 μg m -3 were significantly higher than outdoor PM2.5 standard of 65 μg m -3 recommended by USEPA [United States Environmental Protection Agency. Office of Air and Radiation, Office of Air Quality Planning and Standards, Fact Sheet. EPA's Revised Particulate Matter Standards, 17, July 1997] and PM2.5 constituted a large fraction of indoor respirable particles (PM10) by an average of 78% in four hospitals. High correlation between PM2.5 and PM10 (R 2 of 0.87 for indoors and 0.90 for outdoors) suggested that PM2.5 and PM10 came from similar particulate emission sources. The indoor particulate levels were correlated with the corresponding outdoors (R 2 of 0.78 for PM2.5 and 0.67 for PM10), demonstrating that outdoor infiltration could lead to direct transportation into indoors. In addition to outdoor infiltration, human activities and ventilation types could also influence indoor particulate levels in four hospitals. Total target elements accounted for 3.18-5.56% of PM2.5 and 4.38-9.20% of PM10 by mass, respectively. Na, Al, Ca, Fe, Mg, Mn and Ti were found in the coarse particles, while K, V, Cr, Ni, Cu, Zn, Cd, Sn, Pb, As and Se existed more in the fine particles. The average indoor concentrations of total elements were lower than those measured outdoors, suggesting that indoor elements originated mainly from outdoor emission sources. Enrichment factors (EF) for trace element were calculated to show that elements of anthropogenic origins (Zn, Pb, As, Se, V, Ni, Cu and Cd) were highly enriched with respect to crustal composition (Al, Fe, Ca, Ti and Mn). Factor analysis was used to identify possible pollution source-types, namely street dust, road traffic and

  16. Hospital indoor PM10/PM2.5 and associated trace elements in Guangzhou, China.

    Science.gov (United States)

    Wang, Xinhua; Bi, Xinhui; Sheng, Guoying; Fu, Jiamo

    2006-07-31

    PM10 and PM2.5 samples were collected in the indoor environments of four hospitals and their adjacent outdoor environments in Guangzhou, China during the summertime. The concentrations of 18 target elements in particles were also quantified. The results showed that indoor PM2.5 levels with an average of 99 microg m(-3) were significantly higher than outdoor PM2.5 standard of 65 microg m(-3) recommended by USEPA [United States Environmental Protection Agency. Office of Air and Radiation, Office of Air Quality Planning and Standards, Fact Sheet. EPA's Revised Particulate Matter Standards, 17, July 1997] and PM2.5 constituted a large fraction of indoor respirable particles (PM10) by an average of 78% in four hospitals. High correlation between PM2.5 and PM10 (R(2) of 0.87 for indoors and 0.90 for outdoors) suggested that PM2.5 and PM10 came from similar particulate emission sources. The indoor particulate levels were correlated with the corresponding outdoors (R(2) of 0.78 for PM2.5 and 0.67 for PM10), demonstrating that outdoor infiltration could lead to direct transportation into indoors. In addition to outdoor infiltration, human activities and ventilation types could also influence indoor particulate levels in four hospitals. Total target elements accounted for 3.18-5.56% of PM2.5 and 4.38-9.20% of PM10 by mass, respectively. Na, Al, Ca, Fe, Mg, Mn and Ti were found in the coarse particles, while K, V, Cr, Ni, Cu, Zn, Cd, Sn, Pb, As and Se existed more in the fine particles. The average indoor concentrations of total elements were lower than those measured outdoors, suggesting that indoor elements originated mainly from outdoor emission sources. Enrichment factors (EF) for trace element were calculated to show that elements of anthropogenic origins (Zn, Pb, As, Se, V, Ni, Cu and Cd) were highly enriched with respect to crustal composition (Al, Fe, Ca, Ti and Mn). Factor analysis was used to identify possible pollution source-types, namely street dust, road traffic

  17. Development and Field Application Experience of the Reactor Internal Preventive Maintenance Technology

    International Nuclear Information System (INIS)

    Kanno, A.; Yoshikubo, F.; Morinaka, R.; Tanaka, M.; Hasegawa, K.; Hatou, H.

    2012-01-01

    A reactor internal preventive maintenance technology, Water Jet Peening (WJP), has been developed as a stress corrosion cracking (SCC) mitigation technology that has been successfully implemented during refuelling outages at 15 Boiling Water Reactors (BWR) and three (3) Advanced BWRs (during the site construction and in the shop fabrication) in Japan. WJP is one of the most successful underwater peening methods, which utilizes the energy generated from the collapsing of bubbles produced by the cavitating water jet nozzle. The energy produced from the cavitations introduces compressive residual stress on the metal surface and subsurface up to a depth of several hundred micrometers. Most recently, we have successfully applied WJP to the bottom head components and to some cracked areas on the shroud support in the Tokai-2 plant. In the case of the bottom head components, we produced inspection and repair tooling as a contingency in the event SCC was identified and would be required to be repaired prior to the implementation of WJP. (author)

  18. PM 10, PM 2.5 and PM 1.0—Emissions from industrial plants—Results from measurement programmes in Germany

    Science.gov (United States)

    Ehrlich, C.; Noll, G.; Kalkoff, W.-D.; Baumbach, G.; Dreiseidler, A.

    Emission measurement programmes were carried out at industrial plants in several regions of Germany to determine the fine dust in the waste gases; the PM 10, PM 2.5 and PM 1.0 fractions were sampled using a cascade impactor technique. The installations tested included plants used for: combustion (brown coal, heavy fuel oil, wood), cement production, glass production, asphalt mixing, and processing plants for natural stones and sand, ceramics, metallurgy, chemical production, spray painting, wood processing/chip drying, poultry farming and waste treatment. In addition waste gas samples were taken from small-scale combustion units, like domestic stoves, firing lignite briquettes or wood. In total 303 individual measurement results were obtained during 106 different measurement campaigns. In the study it was found that in more than 70% of the individual emission measurement results from industrial plants and domestic stoves the PM 10 portion amounted to more than 90% and the PM 2.5 portion between 50% and 90% of the total PM (particulate matter) emission. For thermal industrial processes the PM 1.0 portion constituted between 20% and 60% of the total PM emission. Typical particle size distributions for different processes were presented as cumulative frequency distributions and as frequency distributions. The particle size distributions determined for the different plant types show interesting similarities and differences depending on whether the processes are thermal, mechanical, chemical or mixed. Consequently, for the groups of plant investigated, a major finding of this study has been that the particle size distribution is a characteristic of the industrial process. Attempts to correlate particle size distributions of different plants to different gas cleaning technologies did not lead to usable results.

  19. 40 CFR Table C-4 to Subpart C of... - Test Specifications for PM10, PM2.5 and PM10-2.5 Candidate Equivalent Methods

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test Specifications for PM10, PM2.5 and PM10-2.5 Candidate Equivalent Methods C Table C-4 to Subpart C of Part 53 Protection of Environment... Pt. 53, Subpt. C, Table C-4 Table C-4 to Subpart C of Part 53—Test Specifications for PM10, PM2.5 and...

  20. Industrial PM2.5 cause pulmonary adverse effect through RhoA/ROCK pathway.

    Science.gov (United States)

    Yan, Junyan; Lai, Chia-Hsiang; Lung, Shih-Chun Candice; Chen, Chongjun; Wang, Wen-Cheng; Huang, Pin-I; Lin, Chia-Hua

    2017-12-01

    According to the Chinese Ministry of Health, industrial pollution-induced health impacts have been the leading cause of death in China. While industrial fine particulate matter (PM 2.5 ) is associated with adverse health effects, the major action mechanisms of different compositions of PM 2.5 are currently unclear. In this study, we treated normal human lung epithelial BEAS-2B cells with industrial organic and water-soluble PM 2.5 extracts under daily alveolar deposition dose to elucidate the molecular mechanisms underlying adverse pulmonary effects induced by PM 2.5 , including oxidative damage, inflammatory response, lung epithelial barrier dysfunction, and the recruitment of macrophages. We found that water-soluble PM 2.5 extracts caused more severe cytotoxic effects on BEAS-2B cells compared with that of organic extracts. Both organic and water-soluble PM 2.5 extracts induced activation of the RhoA/ROCK pathway. Inflammatory response, epithelial barrier dysfunction, and the activation of NF-кB caused by both PM 2.5 extracts were attenuated by ROCK inhibitor Y-27632. This indicated that both PM 2.5 extracts could cause damage to epithelial cells through RhoA/ROCK-dependent NF-кB activation. Furthermore, the upregulation of macrophage adhesion induced by both PM 2.5 extracts was also attenuated by Y-27632 in a co-culture model of macrophages and the epithelial cells. Therefore, our results support that industrial PM 2.5 extracts-induced activation of the RhoA/ROCK-dependent NF-кB pathway induces pulmonary adverse effect. Thus, pharmacological inhibition of ROCK activation might have therapeutic potential in preventing lung disease associated with PM 2.5 . Copyright © 2017 Elsevier B.V. All rights reserved.

  1. Ecotoxicity of water-soluble PM1, PM2.5 and PM10 aerosols at Gosan Climate Observatory (GCO) in Jeju, Korea

    Science.gov (United States)

    Kim, J. A.; Lee, M.; Yoon, H. O.; Bae, M. S.

    2017-12-01

    The water-soluble components of aerosols are rapidly permeated to various biosurfaces through the deposition process due to their high solubility and have profound effects on ecosystem functioning as well as human health. In this context, the ecotoxicity of atmospheric aerosol was assessed, particularly for water-soluble components. For measurements of ecotoxicity of water soluble components, ambient aerosols of PM1, PM2.5, and PM10 were collected on filters at Gosan Climate Observatory (GCO), Jeju, Korea in May, August, October 2010, March and July 2011. The ecotoxicity was estimated using Vibrio fischeri based on bioluminescence inhibition bioassay. In this study, EC10 (10% effective concentration) value was used as an ecotoxicity indicator. The EC10 value was generally in good relation with major water-soluble constituents such as SO42-, NH4+, and water-soluble organic carbon (WSOC). The characteristics of ecotoxicity was different in PM1, PM2.5, and PM10 aerosols. The EC10 of PM10 was correlated well with SO42- (r=-0.53) and Mg2+(r=-0.52). The ecotoxicity was relatively high in smaller particles with either high NO3-/SO42- ratio or WSOC concentration. The high ecotoxicity was found in outflows mostly from nearby lands especially under stagnant condition.

  2. The Bayesian statistical decision theory applied to the optimization of generating set maintenance

    International Nuclear Information System (INIS)

    Procaccia, H.; Cordier, R.; Muller, S.

    1994-11-01

    The difficulty in RCM methodology is the allocation of a new periodicity of preventive maintenance on one equipment when a critical failure has been identified: until now this new allocation has been based on the engineer's judgment, and one must wait for a full cycle of feedback experience before to validate it. Statistical decision theory could be a more rational alternative for the optimization of preventive maintenance periodicity. This methodology has been applied to inspection and maintenance optimization of cylinders of diesel generator engines of 900 MW nuclear plants, and has shown that previous preventive maintenance periodicity can be extended. (authors). 8 refs., 5 figs

  3. Psychological maintenance as an integrated approach to prevention and correction of professional burning out of the medical staff

    Directory of Open Access Journals (Sweden)

    V. S. Kucher

    2014-01-01

    Full Text Available The syndrome of professional burning out is a complex of symptoms and signs evidenced in various negative psychic conditions at individual, interpersonal and organizational levels. It is formed owing to a long mismatch between the requirements of the professional environment and the resources of the expert. Analysis of the preventive and correctional programs as a psychological assistance showed insufficiency of such approach. Creation of preventive and correctional programs within psychological maintenance from the position of involution of professional resources, taking into account the theoretical - methodological basis (the concept, the purposes, tasks, system approach, criteria of efficiency and the subjective-personal resources of counteraction directed at activization to burning out at all stages of professional development is progressive.

  4. Building and integrating reliability models in a Reliability-Centered-Maintenance approach

    International Nuclear Information System (INIS)

    Verite, B.; Villain, B.; Venturini, V.; Hugonnard, S.; Bryla, P.

    1998-03-01

    Electricite de France (EDF) has recently developed its OMF-Structures method, designed to optimize preventive maintenance of passive structures such as pipes and support, based on risk. In particular, reliability performances of components need to be determined; it is a two-step process, consisting of a qualitative sort followed by a quantitative evaluation, involving two types of models. Initially, degradation models are widely used to exclude some components from the field of preventive maintenance. The reliability of the remaining components is then evaluated by means of quantitative reliability models. The results are then included in a risk indicator that is used to directly optimize preventive maintenance tasks. (author)

  5. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  6. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  7. Model independent measurement of the leptonic kaon decay $K^\\pm \\to \\mu^\\pm \

    CERN Document Server

    Bizzeti, Andrea

    2018-01-01

    Two recent results on rare kaon decays are presented, based on $\\sim 2 \\times 10^{11} K^{\\pm}$ decays recorded by the NA48/2 experiment at CERN SPS in 2003 and 2004. The branching ratio of the rare leptonic decay $K^{\\pm} \\to \\mu^{\\pm} \

  8. Model independent measurement of the leptonic kaon decay $K^\\pm \\to \\mu^\\pm \

    CERN Document Server

    Bizzeti, Andrea

    2017-01-01

    Two recent results on rare kaon decays are presented, based on $\\sim 2 \\times 10^{11} K^{\\pm}$ decays recorded by the NA48/2 experiment at CERN SPS in 2003 and 2004. The branching ratio of the rare leptonic decay $K^{\\pm} \\to \\mu^{\\pm} \

  9. Contract Service for School Maintenance

    Science.gov (United States)

    Modern Schools, 1976

    1976-01-01

    Preventive maintenance can extend useful equipment life in a school building and keep systems running more efficiently. Points to consider before selecting a comprehensive energy management package are listed. (Author/MLF)

  10. Measurement of the CKM angle $\\gamma$ from a combination of $B^{\\pm} \\to Dh^{\\pm}$ analyses

    CERN Document Server

    INSPIRE-00258707; Abellan Beteta, C; Adeva, B; Adinolfi, M; Adrover, C; Affolder, A; Ajaltouni, Z; Albrecht, J; Alessio, F; Alexander, M; Ali, S; Alkhazov, G; Alvarez Cartelle, P; Alves Jr, A A; Amato, S; Amerio, S; Amhis, Y; Anderlini, L; Anderson, J; Andreassen, R; Appleby, R B; Aquines Gutierrez, O; Archilli, F; Artamonov, A; Artuso, M; Aslanides, E; Auriemma, G; Bachmann, S; Back, J J; Baesso, C; Balagura, V; Baldini, W; Barlow, R J; Barschel, C; Barsuk, S; Barter, W; Bauer, Th; Bay, A; Beddow, J; Bedeschi, F; Bediaga, I; Belogurov, S; Belous, K; Belyaev, I; Ben-Haim, E; Bencivenni, G; Benson, S; Benton, J; Berezhnoy, A; Bernet, R; Bettler, M -O; van Beuzekom, M; Bien, A; Bifani, S; Bird, T; Bizzeti, A; Bjørnstad, P M; Blake, T; Blanc, F; Blouw, J; Blusk, S; Bocci, V; Bondar, A; Bondar, N; Bonivento, W; Borghi, S; Borgia, A; Bowcock, T J V; Bowen, E; Bozzi, C; Brambach, T; van den Brand, J; Bressieux, J; Brett, D; Britsch, M; Britton, T; Brook, N H; Brown, H; Burducea, I; Bursche, A; Busetto, G; Buytaert, J; Cadeddu, S; Callot, O; Calvi, M; Calvo Gomez, M; Camboni, A; Campana, P; Campora Perez, D; Carbone, A; Carboni, G; Cardinale, R; Cardini, A; Carranza-Mejia, H; Carson, L; Carvalho Akiba, K; Casse, G; Castillo Garcia, L; Cattaneo, M; Cauet, Ch; Charles, M; Charpentier, Ph; Chen, P; Chiapolini, N; Chrzaszcz, M; Ciba, K; Cid Vidal, X; Ciezarek, G; Clarke, P E L; Clemencic, M; Cliff, H V; Closier, J; Coca, C; Coco, V; Cogan, J; Cogneras, E; Collins, P; Comerma-Montells, A; Contu, A; Cook, A; Coombes, M; Coquereau, S; Corti, G; Couturier, B; Cowan, G A; Craik, D C; Cunliffe, S; Currie, R; D'Ambrosio, C; David, P; David, P N Y; Davis, A; De Bonis, I; De Bruyn, K; De Capua, S; De Cian, M; De Miranda, J M; De Paula, L; De Silva, W; De Simone, P; Decamp, D; Deckenhoff, M; Del Buono, L; Déléage, N; Derkach, D; Deschamps, O; Dettori, F; Di Canto, A; Dijkstra, H; Dogaru, M; Donleavy, S; Dordei, F; Dosil Suárez, A; Dossett, D; Dovbnya, A; Dupertuis, F; Dzhelyadin, R; Dziurda, A; Dzyuba, A; Easo, S; Egede, U; Egorychev, V; Eidelman, S; van Eijk, D; Eisenhardt, S; Eitschberger, U; Ekelhof, R; Eklund, L; El Rifai, I; Elsasser, Ch; Elsby, D; Falabella, A; Färber, C; Fardell, G; Farinelli, C; Farry, S; Fave, V; Ferguson, D; Fernandez Albor, V; Ferreira Rodrigues, F; Ferro-Luzzi, M; Filippov, S; Fiore, M; Fitzpatrick, C; Fontana, M; Fontanelli, F; Forty, R; Francisco, O; Frank, M; Frei, C; Frosini, M; Furcas, S; Furfaro, E; Gallas Torreira, A; Galli, D; Gandelman, M; Gandini, P; Gao, Y; Garofoli, J; Garosi, P; Garra Tico, J; Garrido, L; Gaspar, C; Gauld, R; Gersabeck, E; Gersabeck, M; Gershon, T; Ghez, Ph; Gibson, V; Gligorov, V V; Göbel, C; Golubkov, D; Golutvin, A; Gomes, A; Gordon, H; Grabalosa Gándara, M; Graciani Diaz, R; Granado Cardoso, L A; Graugés, E; Graziani, G; Grecu, A; Greening, E; Gregson, S; Griffith, P; Grünberg, O; Gui, B; Gushchin, E; Guz, Yu; Gys, T; Hadjivasiliou, C; Haefeli, G; Haen, C; Haines, S C; Hall, S; Hampson, T; Hansmann-Menzemer, S; Harnew, N; Harnew, S T; Harrison, J; Hartmann, T; He, J; Heijne, V; Hennessy, K; Henrard, P; Hernando Morata, J A; van Herwijnen, E; Hicheur, A; Hicks, E; Hill, D; Hoballah, M; Hombach, C; Hopchev, P; Hulsbergen, W; Hunt, P; Huse, T; Hussain, N; Hutchcroft, D; Hynds, D; Iakovenko, V; Idzik, M; Ilten, P; Jacobsson, R; Jaeger, A; Jans, E; Jaton, P; Jawahery, A; Jing, F; John, M; Johnson, D; Jones, C R; Joram, C; Jost, B; Kaballo, M; Kandybei, S; Karacson, M; Karbach, T M; Kenyon, I R; Kerzel, U; Ketel, T; Keune, A; Khanji, B; Kochebina, O; Komarov, I; Koopman, R F; Koppenburg, P; Korolev, M; Kozlinskiy, A; Kravchuk, L; Kreplin, K; Kreps, M; Krocker, G; Krokovny, P; Kruse, F; Kucharczyk, M; Kudryavtsev, V; Kvaratskheliya, T; La Thi, V N; Lacarrere, D; Lafferty, G; Lai, A; Lambert, D; Lambert, R W; Lanciotti, E; Lanfranchi, G; Langenbruch, C; Latham, T; Lazzeroni, C; Le Gac, R; van Leerdam, J; Lees, J -P; Lefèvre, R; Leflat, A; Lefrançois, J; Leo, S; Leroy, O; Lesiak, T; Leverington, B; Li, Y; Li Gioi, L; Liles, M; Lindner, R; Linn, C; Liu, B; Liu, G; Lohn, S; Longstaff, I; Lopes, J H; Lopez Asamar, E; Lopez-March, N; Lu, H; Lucchesi, D; Luisier, J; Luo, H; Machefert, F; Machikhiliyan, I V; Maciuc, F; Maev, O; Malde, S; Manca, G; Mancinelli, G; Marconi, U; Märki, R; Marks, J; Martellotti, G; Martens, A; Martín Sánchez, A; Martinelli, M; Martinez Santos, D; Martins Tostes, D; Massafferri, A; Matev, R; Mathe, Z; Matteuzzi, C; Maurice, E; Mazurov, A; Mc Skelly, B; McCarthy, J; McNab, A; McNulty, R; Meadows, B; Meier, F; Meissner, M; Merk, M; Milanes, D A; Minard, M -N; Molina Rodriguez, J; Monteil, S; Moran, D; Morawski, P; Morello, M J; Mountain, R; Mous, I; Muheim, F; Müller, K; Muresan, R; Muryn, B; Muster, B; Naik, P; Nakada, T; Nandakumar, R; Nasteva, I; Needham, M; Neufeld, N; Nguyen, A D; Nguyen, T D; Nguyen-Mau, C; Nicol, M; Niess, V; Niet, R; Nikitin, N; Nikodem, T; Nomerotski, A; Novoselov, A; Oblakowska-Mucha, A; Obraztsov, V; Oggero, S; Ogilvy, S; Okhrimenko, O; Oldeman, R; Orlandea, M; Otalora Goicochea, J M; Owen, P; Oyanguren, A; Pal, B K; Palano, A; Palutan, M; Panman, J; Papanestis, A; Pappagallo, M; Parkes, C; Parkinson, C J; Passaleva, G; Patel, G D; Patel, M; Patrick, G N; Patrignani, C; Pavel-Nicorescu, C; Pazos Alvarez, A; Pellegrino, A; Penso, G; Pepe Altarelli, M; Perazzini, S; Perego, D L; Perez Trigo, E; Pérez-Calero Yzquierdo, A; Perret, P; Perrin-Terrin, M; Pessina, G; Petridis, K; Petrolini, A; Phan, A; Picatoste Olloqui, E; Pietrzyk, B; Pilař, T; Pinci, D; Playfer, S; Plo Casasus, M; Polci, F; Polok, G; Poluektov, A; Polycarpo, E; Popov, A; Popov, D; Popovici, B; Potterat, C; Powell, A; Prisciandaro, J; Pritchard, A; Prouve, C; Pugatch, V; Puig Navarro, A; Punzi, G; Qian, W; Rademacker, J H; Rakotomiaramanana, B; Rama, M; Rangel, M S; Raniuk, I; Rauschmayr, N; Raven, G; Redford, S; Reid, M M; dos Reis, A C; Ricciardi, S; Richards, A; Rinnert, K; Rives Molina, V; Roa Romero, D A; Robbe, P; Rodrigues, E; Rodriguez Perez, P; Roiser, S; Romanovsky, V; Romero Vidal, A; Rouvinet, J; Ruf, T; Ruffini, F; Ruiz, H; Ruiz Valls, P; Sabatino, G; Saborido Silva, J J; Sagidova, N; Sail, P; Saitta, B; Salustino Guimaraes, V; Salzmann, C; Sanmartin Sedes, B; Sannino, M; Santacesaria, R; Santamarina Rios, C; Santovetti, E; Sapunov, M; Sarti, A; Satriano, C; Satta, A; Savrie, M; Savrina, D; Schaack, P; Schiller, M; Schindler, H; Schlupp, M; Schmelling, M; Schmidt, B; Schneider, O; Schopper, A; Schune, M -H; Schwemmer, R; Sciascia, B; Sciubba, A; Seco, M; Semennikov, A; Senderowska, K; Sepp, I; Serra, N; Serrano, J; Seyfert, P; Shapkin, M; Shapoval, I; Shatalov, P; Shcheglov, Y; Shears, T; Shekhtman, L; Shevchenko, O; Shevchenko, V; Shires, A; Silva Coutinho, R; Skwarnicki, T; Smith, N A; Smith, E; Smith, M; Sokoloff, M D; Soler, F J P; Soomro, F; Souza, D; Souza De Paula, B; Spaan, B; Sparkes, A; Spradlin, P; Stagni, F; Stahl, S; Steinkamp, O; Stoica, S; Stone, S; Storaci, B; Straticiuc, M; Straumann, U; Subbiah, V K; Sun, L; Swientek, S; Syropoulos, V; Szczekowski, M; Szczypka, P; Szumlak, T; T'Jampens, S; Teklishyn, M; Teodorescu, E; Teubert, F; Thomas, C; Thomas, E; van Tilburg, J; Tisserand, V; Tobin, M; Tolk, S; Tonelli, D; Topp-Joergensen, S; Torr, N; Tournefier, E; Tourneur, S; Tran, M T; Tresch, M; Tsaregorodtsev, A; Tsopelas, P; Tuning, N; Ubeda Garcia, M; Ukleja, A; Urner, D; Uwer, U; Vagnoni, V; Valenti, G; Vazquez Gomez, R; Vazquez Regueiro, P; Vecchi, S; Velthuis, J J; Veltri, M; Veneziano, G; Vesterinen, M; Viaud, B; Vieira, D; Vilasis-Cardona, X; Vollhardt, A; Volyanskyy, D; Voong, D; Vorobyev, A; Vorobyev, V; Voß, C; Voss, H; Waldi, R; Wallace, R; Wandernoth, S; Wang, J; Ward, D R; Watson, N K; Webber, A D; Websdale, D; Whitehead, M; Wicht, J; Wiechczynski, J; Wiedner, D; Wiggers, L; Wilkinson, G; Williams, M P; Williams, M; Wilson, F F; Wishahi, J; Witek, M; Wotton, S A; Wright, S; Wu, S; Wyllie, K; Xie, Y; Xing, Z; Yang, Z; Young, R; Yuan, X; Yushchenko, O; Zangoli, M; Zavertyaev, M; Zhang, F; Zhang, L; Zhang, W C; Zhang, Y; Zhelezov, A; Zhokhov, A; Zhong, L; Zvyagin, A

    2013-01-01

    A combination of three LHCb measurements of the CKM angle $\\gamma$ is presented. The decays $B^\\pm\\to DK^\\pm$ and $B^\\pm\\to D\\pi^\\pm$ are used, where $D$ denotes an admixture of $D^0$ and $\\overline{D^0}$ mesons, decaying into $K^+K^-$, $\\pi^+\\pi^-$, $K^\\pm \\pi^\\mp$, $K^\\pm \\pi^\\mp \\pi^\\pm \\pi^\\mp$, $K_S\\pi^+\\pi^-$, or $K_S K^+K^-$ final states. All measurements use a dataset corresponding to 1.0 fb$^{-1}$ of data. Combining results from $B^\\pm\\to DK^\\pm$ decays alone a best-fit value of $\\gamma = 72.0^\\circ$ is found, and confidence intervals are set \\begin{align*} \\gamma \\in [56.4,86.7]^\\circ \\quad &{\\rm at\\ 68\\%\\,CL}\\,,\\\\ \\gamma \\in [42.6,99.6]^\\circ \\quad &{\\rm at\\ 95\\%\\,CL}\\,. \\end{align*} The best-fit value of $\\gamma$ found from a combination of results from $B^\\pm\\to D\\pi^\\pm$ decays alone, is $\\gamma = 18.9^\\circ$, and the confidence intervals \\begin{align*} \\gamma \\in [7.4,99.2]^\\circ \\quad \\cup \\quad [167.9,176.4]^\\circ \\quad &{\\rm at\\ 68\\%\\,CL}\\, \\end{align*} are set, without constrai...

  11. A measurement of the ratio of branching fractions: $\\frac{\\mathcal{B}(B^{\\pm}\\rightarrow D K^{\\pm})}{\\mathcal{B}(B^{\\pm}\\rightarrow D\\pi^{\\pm})}$ for $D\\rightarrow K\\pi$, $KK$, $K\\pi\\pi\\pi$ and $K^0_S\\pi\\pi$

    CERN Document Server

    The LHCb Collaboration

    2011-01-01

    Using the 36.5~pb$^{-1}$ of data collected by the LHCb experiment in 2010, the ratio of two $B_u$ hadronic branching fractions: ${\\cal B}(B^{\\pm}\\rightarrow D K^{\\pm})\\ /\\ {\\cal B}(B^{\\pm}\\rightarrow D \\pi^{\\pm})$ is measured for events in which the $D$ meson is reconstructed in one of four final states. In the Cabibbo-favoured decays $D^0\\rightarrow K^{-}\\pi^{+}$ and $D^{0}\\rightarrow K^{-}\\pi^{+}\\pi^{-}\\pi^{+}$, this ratio is measured as $(6.30\\pm0.38\\pm0.40)\\%$. It is determined to be $(9.31\\pm1.89\\pm0.53)\\%$ in the $CP$ eigenstate mode $D\\rightarrow K^{+} K^{-}$ and $(12\\,^{+6}_{-5}\\pm1)\\%$ in the $D\\rightarrow K^0_{\\rm\\scriptscriptstyle S}\\pi^{+}\\pi^{-}$ channel. From this work, two observables are measured: \\begin{eqnarray*} R_{CP+} &=& 1.48 \\pm 0.31 (stat.) \\pm 0.12 (syst.)\\\\ A_{CP+} &=& 0.07 \\pm 0.18 (stat.) \\pm 0.07 (syst.) \\end{eqnarray*}

  12. Environmental favourable foundries through maintenance activities

    Directory of Open Access Journals (Sweden)

    A. Saniuk

    2015-10-01

    Full Text Available Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help to reduce losses and thereby improve the efficiency of the processes used in the production of resources (e.g. raw materials, energy, etc., especially in areas such as: the choice of an appropriate strategy for the maintenance of machinery and equipment (e.g. reactive, preventive, proactive; inventory management of spare parts; lubrication management and management of technology media.

  13. Indoor air quality modeling for PM 10, PM 2.5, and PM 1.0 in naturally ventilated classrooms of an urban Indian school building.

    Science.gov (United States)

    Goyal, Radha; Khare, Mukesh

    2011-05-01

    Assessment of indoor air quality (IAQ) in classrooms of school buildings is of prime concern due to its potential effects on student's health and performance as they spend a substantial amount of their time (6-7 h per day) in schools. A number of airborne contaminants may be present in urban school environment. However, respirable suspended particulate matter (RSPM) is of great significance as they may significantly affect occupants' health. The objectives of the present study are twofold, one, to measure the concentrations of PM(10) (building located near a heavy-traffic roadway (9,755 and 4,296 vehicles/hour during weekdays and weekends, respectively); and second, to develop single compartment mass balance-based IAQ models for PM(10) (NVIAQM(pm10)), PM(2.5) (NVIAQM(pm2.5)), and PM(1.0) (NVIAQM(pm1.0)) for predicting their indoor concentrations. Outdoor RSPM levels and classroom characteristics, such as size, occupancy level, temperature, relative humidity, and CO(2) concentrations have also been monitored during school hours. Predicted indoor PM(10) concentrations show poor correlations with observed indoor PM(10) concentrations (R (2) = 0.028 for weekdays, and 0.47 for weekends). However, a fair degree of agreement (d) has been found between observed and predicted concentrations, i.e., 0.42 for weekdays and 0.59 for weekends. Furthermore, NVIAQM(pm2.5) and NVIAQM(pm1.0) results show good correlations with observed concentrations of PM(2.5) (R(2) = 0.87 for weekdays and 0.9 for weekends) and PM(1.0) (R(2) = 0.86 for weekdays and 0.87 for weekends). NVIAQM(pm10) shows the tendency to underpredict indoor PM(10) concentrations during weekdays as it does not take into account the occupant's activities and its effects on the indoor concentrations during the class hours. Intense occupant's activities cause resuspension or delayed deposition of PM(10). The model results further suggests conductance of experimental and physical simulation studies on dispersion of

  14. Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Seyyed Mohammad Hassan Hosseini

    2016-05-01

    Full Text Available Scheduling problem for the hybrid flow shop scheduling problem (HFSP followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All machines can process all kinds of parts in this stage but each machine can process only one part at the same time. The second stage is a single assembly machine or a single assembly team of workers. The aim is to schedule the parts on the machines and assembly sequence and also determine when the preventive maintenance activities get done in order to minimize the completion time of all products (makespan. A mathematical modeling is presented and its validation is shown by solving an example in small scale. Since this problem has been proved strongly NP-hard, in order to solve the problem in medium and large scale, four heuristic algorithms is proposed based on the Johnson’s algorithm. The numerical experiments are used to run the mathematical model and evaluate the performance of the proposed algorithms.

  15. Asthma and PM10

    Directory of Open Access Journals (Sweden)

    Gilmour M Ian

    2000-07-01

    Full Text Available Abstract PM10 (the mass of particles present in the air having a 50% cutoff for particles with an aerodynamic diameter of 10 μm is the standard measure of particulate air pollution used worldwide. Epidemiological studies suggest that asthma symptoms can be worsened by increases in the levels of PM10. Epidemiological evidence at present indicates that PM10 increases do not raise the chances of initial sensitisation and induction of disease, although further research is warranted. PM10 is a complex mixture of particle types and has many components and there is no general agreement regarding which component(s could lead to exacerbations of asthma. However pro-inflammatory effects of transition metals, hydrocarbons, ultrafine particles and endotoxin, all present to varying degrees in PM10, could be important. An understanding of the role of the different components of PM10 in exacerbating asthma is essential before proper risk assessment can be undertaken leading to advice on risk management for the many asthmatics who are exposed to air pollution particles.

  16. Two-stage maintenance of a production system with exponentially distributed on and off-periods

    NARCIS (Netherlands)

    van Dijkhuizen, G.C.; van Harten, Aart

    1998-01-01

    We consider an on–off production system which is subject to failure during on-periods. In case of a failure, the production system is maintained correctively. In addition, preventive maintenance is carried out to prevent failures. The costs of both preventive and corrective maintenance are modelled

  17. Spatial distribution of particulate matter (PM10 and PM2.5) in Seoul Metropolitan Subway stations.

    Science.gov (United States)

    Kim, Ki Youn; Kim, Yoon Shin; Roh, Young Man; Lee, Cheol Min; Kim, Chi Nyon

    2008-06-15

    The aims of this study are to examine the concentrations of PM10 and PM2.5 in areas within the Seoul Metropolitan Subway network and to provide fundamental data in order to protect respiratory health of subway workers and passengers from air pollutants. A total of 22 subway stations located on lines 1-4 were selected based on subway official's guidance. At these stations both subway worker areas (station offices, rest areas, ticket offices and driver compartments) and passengers areas (station precincts, subway carriages and platforms) were the sites used for measuring the levels of PM. The mean concentrations of PM10 and PM2.5 were relatively higher on platforms, inside subway carriages and in driver compartments than in the other areas monitored. The levels of PM10 and PM2.5 for station precincts and platforms exceeded the 24-h acceptable threshold limits of 150 microg/m3 for PM10 and 35 microg/m3 for PM2.5, which are regulated by the U.S. Environmental Protection Agency (EPA). However, levels measured in station and ticket offices fell below the respective threshold. The mean PM10 and PM2.5 concentrations on platforms located underground were significantly higher than those at ground level (p<0.05).

  18. Laboratory services series: a master-slave manipulator maintenance program

    International Nuclear Information System (INIS)

    Jenness, R.G.; Hicks, R.E.; Wicker, C.D.

    1976-12-01

    The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance

  19. A predictive maintenance approach for improved nuclear plant availability

    International Nuclear Information System (INIS)

    Verma, R.M.P.; Pandya, M.B.; Kini, M.P.

    1979-01-01

    Predictive maintenance programme as against preventive maintenance programme aims at diagnosing, inspecting, monitoring, and objective condition-checking of equipment. It helps in forecasting failures, and scheduling the optimal frequencies for overhauls, replacements, lubrication etc. It also helps in establishing work load, manpower, resource planning and inventory control. Various stages of predictive maintenance programme for a nuclear power plant are outlined. A partial list of instruments for predictive maintenance is given. (M.G.B.)

  20. Diagnostics of heavy mining equipment during the scheduled preventive maintenance

    Science.gov (United States)

    Drygin, M. Yu; Kuryshkin, N. P.

    2018-01-01

    Intensification of production, economic globalization and dramatic downgrade of the workers’ professional skills lead to unacceptable technical state of heavy mining equipment. Equipment maintenance outage reaches 84 % of the total downtime, of which emergency maintenance takes up to 36 % of time, that excesses 429 hours per year fr one excavator. It is shown that yearly diagnostics using methods of non-destructive check allows to reduce emergency downtime by 47 %, and 55 % of revealed defects can be eliminated without breaking the technological cycle of the equipment.

  1. MODELS CONCERNING PREVENTIVE VERIFICATION OF TECHNICAL EQUIPMENT

    Directory of Open Access Journals (Sweden)

    CÂRLAN M.

    2016-12-01

    Full Text Available The paper presents three operative models whose purpose is to improve the practice of preventive maintenance to a wide range of technical installations. Although the calculation criteria are different, the goal is the same: to determine the optimum time between two consecutive preventive interventions. The optimum criteria of these models are: - the maximum share of technical entity operating probabilities, in the case of the Ackoff - Sasieni [1] method; -the optimum time interval for preventive verification depending on the preventive-corrective maintenance costs imposed by the deciding factor, for the AsturioBaldin [2] model; - the minimum number of renewals – preventive and/or corrective maintenance operations [3

  2. Development of a {sup 147}Pm source for beta-backscatter thickness gauge applications

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Manoj; Udhayakumar, J. [Radiopharmaceuticals Division, Bhabha Atomic Research Center, Radiological Laboratory, Trombay, Mumbai 400 085 (India); Nuwad, J.; Shukla, Rakesh; Pillai, C.G.S. [Chemistry Division, Bhabha Atomic Research Center, Trombay, Mumbai 400 085 (India); Dash, Ashutosh, E-mail: adash@barc.gov.i [Radiopharmaceuticals Division, Bhabha Atomic Research Center, Radiological Laboratory, Trombay, Mumbai 400 085 (India); Venkatesh, Meera [Radiopharmaceuticals Division, Bhabha Atomic Research Center, Radiological Laboratory, Trombay, Mumbai 400 085 (India)

    2011-03-15

    This paper describes a method for the preparation of {sup 147}Pm sources, utilized in the determination of graphite coating thickness on the inner surface of the zircaloy cladding tube of nuclear fuels. {sup 147}Pm was adsorbed on a limited surface area [1.5 mm ({phi})x2 mm (l)] of a cylindrical aluminum rod [1.5 mm ({phi})x10 mm (l)]. In brief, the selected tip area [1.5 mm ({phi})x2 mm (l)] was anodized at a current density of 15 mA/cm{sup 2} at 15 {sup o}C in 3 M.H{sub 2}SO{sub 4} for 2 h followed by immersion of this area in 10 {mu}L of {sup 147}Pm solution containing 37 MBq (1 mCi) of activity at pH 6.0 for 24 h. The radioactive area was subsequently covered with a thin layer of Polymethyl Methacrylate (PMMA) to prevent leaching of {sup 147}Pm from the source. The quantity of incorporated {sup 147}Pm activity was assayed in a calibrated ion chamber. Quality control tests were carried out to ensure nonleachability, uniform distribution of activity and stability of the sources.

  3. Using support vector regression to predict PM10 and PM2.5

    International Nuclear Information System (INIS)

    Weizhen, Hou; Zhengqiang, Li; Yuhuan, Zhang; Hua, Xu; Ying, Zhang; Kaitao, Li; Donghui, Li; Peng, Wei; Yan, Ma

    2014-01-01

    Support vector machine (SVM), as a novel and powerful machine learning tool, can be used for the prediction of PM 10 and PM 2.5 (particulate matter less or equal than 10 and 2.5 micrometer) in the atmosphere. This paper describes the development of a successive over relaxation support vector regress (SOR-SVR) model for the PM 10 and PM 2.5 prediction, based on the daily average aerosol optical depth (AOD) and meteorological parameters (atmospheric pressure, relative humidity, air temperature, wind speed), which were all measured in Beijing during the year of 2010–2012. The Gaussian kernel function, as well as the k-fold crosses validation and grid search method, are used in SVR model to obtain the optimal parameters to get a better generalization capability. The result shows that predicted values by the SOR-SVR model agree well with the actual data and have a good generalization ability to predict PM 10 and PM 2.5 . In addition, AOD plays an important role in predicting particulate matter with SVR model, which should be included in the prediction model. If only considering the meteorological parameters and eliminating AOD from the SVR model, the prediction results of predict particulate matter will be not satisfying

  4. Preliminary analysis of variability in concentration of fine particulate matter - PM1.0, PM2.5 and PM10 in area of Poznań city

    Directory of Open Access Journals (Sweden)

    Sówka Izabela

    2018-01-01

    Full Text Available It is commonly known, that suspended particulate matter pose a threat to human life and health, negatively influence the flora, climate and also materials. Especially dangerous is the presence of high concentration of particulate matter in the area of cities, where density of population is high. The research aimed at determining the variability of suspended particulate matter concentration (PM1.0, PM2.5 and PM10 in two different thermal seasons, in the area of Poznań city. As a part of carried out work we analyzed the variability of concentrations and also performed a preliminary analysis of their correlation. Measured concentrations of particulate matter were contained within following ranges: PM10 – 8.7-69.6 μg/m3, PM2.5 – 2.2-88.5 μg/m3, PM1.0 – 2.5-22.9 μg/m3 in the winter season and 1.0-42.8 μg/m3 (PM10, 1.2-40.3 μg/m3 (PM2.5 and 2.7-10.4 (PM1.0 in the summer season. Preliminary correlative analysis indicated interdependence between the temperature of air, the speed of wind and concentration of particulate matter in selected measurement points. The values of correlation coefficients between the air temperature, speed of wind and concentrations of particulate matter were respectively equal to: for PM10: -0.59 and -0.55 (Jana Pawła II Street, -0.53 and -0.53 (Szymanowskiego Street, for PM2.5: -0.60 and -0.53 (Jana Pawła II Street and for PM1.0 -0.40 and -0.59 (Jana Pawła II Street.

  5. 9 CFR 416.14 - Maintenance of Sanitation SOP's.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Maintenance of Sanitation SOP's. 416... ACT SANITATION § 416.14 Maintenance of Sanitation SOP's. Each official establishment shall routinely evaluate the effectiveness of the Sanitation SOP's and the procedures therein in preventing direct...

  6. Source Apportionment and Elemental Composition of PM2.5 and PM10 in Jeddah City, Saudi Arabia.

    Science.gov (United States)

    Khodeir, Mamdouh; Shamy, Magdy; Alghamdi, Mansour; Zhong, Mianhua; Sun, Hong; Costa, Max; Chen, Lung-Chi; Maciejczyk, Polina

    2012-07-01

    This paper presents the first comprehensive investigation of PM2.5 and PM10 composition and sources in Saudi Arabia. We conducted a multi-week multiple sites sampling campaign in Jeddah between June and September, 2011, and analyzed samples by XRF. The overall mean mass concentration was 28.4 ± 25.4 μg/m 3 for PM2.5 and 87.3 ± 47.3 μg/m 3 for PM10, with significant temporal and spatial variability. The average ratio of PM2.5/PM10 was 0.33. Chemical composition data were modeled using factor analysis with varimax orthogonal rotation to determine five and four particle source categories contributing significant amount of for PM2.5 and PM10 mass, respectively. In both PM2.5 and PM10 sources were (1) heavy oil combustion characterized by high Ni and V; (2) resuspended soil characterized by high concentrations of Ca, Fe, Al, and Si; and (3) marine aerosol. The two other sources in PM2.5 were (4) Cu/Zn source; (5) traffic source identified by presence of Pb, Br, and Se; while in PM10 it was a mixed industrial source. To estimate the mass contributions of each individual source category, the CAPs mass concentration was regressed against the factor scores. Cumulatively, resuspended soil and oil combustion contributed 77 and 82% mass of PM2.5 and PM10, respectively.

  7. Research on Application of FMECA in Missile Equipment Maintenance Decision

    Science.gov (United States)

    Kun, Wang

    2018-03-01

    Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.

  8. PM levels in urban area of Bejaia

    Science.gov (United States)

    Benaissa, Fatima; Maesano, Cara Nichole; Alkama, Rezak; Annesi-Maesano, Isabella

    2017-04-01

    Air pollution is not routinely measured in Bejaia City, Algeria, an urban area of around 200,000 inhabitants. We present first time measurements of particulate matter (PM) mass concentrations for this city (PM10, PM7, PM4, PM2.5 and PM1) over the course of one week, from July 8 to July 14, 2015. This study covered eight urban sampling sites and 169 measurements were obtained to determine mass concentration levels. Air pollution is not routinely measured in Bejaia City, Algeria, an urban area of around 200,000 inhabitants. We present first time measurements of particulate matter (PM) mass concentrations for this city (PM10, PM7, PM4, PM2.5 and PM1) over the course of one week, from July 8 to July 14, 2015. This study covered eight urban sampling sites and 169 measurements were obtained to determine mass concentration levels. The average city-wide PM10 and PM2.5 concentrations measured during this sampling were 87.8 ± 33.9 and 28.7 ± 10.6 µg/m3 respectively. These results show that particulate matter levels are high and exceed Algerian ambient air quality standards (maximum 80 µg/m3, without specifying the particle size). Further, PM10 and PM2.5 averages were well above the prescribed 24-hour average World Health Organization Air Quality Guidelines (WHO AQG) (50 µg/m3 for PM10 and 25 µg/m3 for PM2.5). The PM1, PM2,5, PM4 and PM7 fractions accounted for 15%, 32 %, 56% and 78% respectively of the PM10 measurements. Our analysis reveals that PM concentration variations in the study region were influenced primarily by traffic. In fact, lower PM10 concentrations (21.7 and 33.1 µg/m3) were recorded in residential sites while higher values (53.1, and 45.2 µg/m3) were registered in city centers. Keywords: Particulate matter, Urban area, vehicle fleet, Bejaia.

  9. On the origin and variability of suspended particulate matter (PM1, PM2.5 and PM10) concentrations in Cyprus.

    Science.gov (United States)

    Pikridas, Michael; Vrekoussis, Mihalis; Mihalopoulos, Nikolaos; Kizas, Christos; Savvides, Chrysanthos; Sciare, Jean

    2017-04-01

    The Eastern Mediterranean (EM) lies at the crossroad of three different continents (Europe, Asia, and Africa). EM is a densely populated region including several cities with 3M inhabitants or more (e.g. Athens, Istanbul, Izmir, and Cairo). It has been identified as the most polluted area in Europe with respect to particulate matter (PM) mainly due to the combination of high photochemical activity, which causes pollutants to oxidize and partitioning in the particle phase, with the elevated pollutants emissions from neighboring regions. In addition, the proximity to Africa and the Middle East allows frequent transport of dust particles. At the center of the Eastern Mediterranean lies the island of Cyprus, which has received very little attention regarding its PM levels despite being the location in Europe most frequently impacted by air masses from the Middle East. Herewith, we present a historical PM archive that spans 2 decades. It involves ongoing monitoring on a daily basis of particulate matter with diameters smaller than 10 μm (PM10), 2.5 μm (PM2.5), and 1 μm (PM1) conducted in at least one, of the 12 currently existing air quality stations in Cyprus since 1997, 2005, and 2009, respectively. The most extended PM datasets correspond a) to the Agia Marina Xyliatou (AMX) monitoring station established at a remote area at the foothills of mount Troodos and b) that of the inland capital, Nicosia. Based on this long-term dataset, the diurnal, temporal and annual variability is assessed. Prior to 2010, PM10 concentration at all sites remained relatively constant, but at different levels, violating the annual EU legislated PM10 limit of 40 μg m-3. Since 2010, coarse mode levels have decreased at all sites. The reported decrease was equal to 30% at AMX. As a result, since 2010 the observed levels comply with the EU legislation threshold. Satellite observations of Aerosol Optical Thickness (AOT) Moderate Resolution Imaging Spectroradiometer (MODIS) onboard NASA

  10. Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-04-01

    Full Text Available This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.

  11. The powdery mildew resistance gene Pm8 derived from rye is suppressed by its wheat ortholog Pm3.

    Science.gov (United States)

    Hurni, Severine; Brunner, Susanne; Stirnweis, Daniel; Herren, Gerhard; Peditto, David; McIntosh, Robert A; Keller, Beat

    2014-09-01

    The powdery mildew resistance gene Pm8 derived from rye is located on a 1BL.1RS chromosome translocation in wheat. However, some wheat lines with this translocation do not show resistance to isolates of the wheat powdery mildew pathogen avirulent to Pm8 due to an unknown genetically dominant suppression mechanism. Here we show that lines with suppressed Pm8 activity contain an intact and expressed Pm8 gene. Therefore, the absence of Pm8 function in certain 1BL.1RS-containing wheat lines is not the result of gene loss or mutation but is based on suppression. The wheat gene Pm3, an ortholog of rye Pm8, suppressed Pm8-mediated powdery mildew resistance in lines containing Pm8 in a transient single-cell expression assay. This result was further confirmed in transgenic lines with combined Pm8 and Pm3 transgenes. Expression analysis revealed that suppression is not the result of gene silencing, either in wheat 1BL.1RS translocation lines carrying Pm8 or in transgenic genotypes with both Pm8 and Pm3 alleles. In addition, a similar abundance of the PM8 and PM3 proteins in single or double homozygous transgenic lines suggested that a post-translational mechanism is involved in suppression of Pm8. Co-expression of Pm8 and Pm3 genes in Nicotiana benthamiana leaves followed by co-immunoprecipitation analysis showed that the two proteins interact. Therefore, the formation of a heteromeric protein complex might result in inefficient or absent signal transmission for the defense reaction. These data provide a molecular explanation for the suppression of resistance genes in certain genetic backgrounds and suggest ways to circumvent it in future plant breeding. © 2014 The Authors The Plant Journal © 2014 John Wiley & Sons Ltd.

  12. A novel PM motor with hybrid PM excitation and asymmetric rotor structure for high torque performance

    Directory of Open Access Journals (Sweden)

    Gaohong Xu

    2017-05-01

    Full Text Available This paper proposes a novel permanent magnet (PM motor for high torque performance, in which hybrid PM material and asymmetric rotor design are applied. The hybrid PM material is adopted to reduce the consumption of rare-earth PM because ferrite PM is assisted to enhance the torque production. Meanwhile, the rotor structure is designed to be asymmetric by shifting the surface-insert PM (SPM, which is used to improve the torque performance, including average torque and torque ripple. Moreover, the reasons for improvement of the torque performance are explained by evaluation and analysis of the performances of the proposed motor. Compared with SPM motor and V-type motor, the merit of high utilization ratio of rare-earth PM is also confirmed, showing that the proposed motor can offer higher torque density and lower torque ripple simultaneously with less consumption of rare-earth PM.

  13. Discounted cost model for condition-based maintenance optimization

    International Nuclear Information System (INIS)

    Weide, J.A.M. van der; Pandey, M.D.; Noortwijk, J.M. van

    2010-01-01

    This paper presents methods to evaluate the reliability and optimize the maintenance of engineering systems that are damaged by shocks or transients arriving randomly in time and overall degradation is modeled as a cumulative stochastic point process. The paper presents a conceptually clear and comprehensive derivation of formulas for computing the discounted cost associated with a maintenance policy combining both condition-based and age-based criteria for preventive maintenance. The proposed discounted cost model provides a more realistic basis for optimizing the maintenance policies than those based on the asymptotic, non-discounted cost rate criterion.

  14. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  15. In vitro investigations of platinum, palladium, and rhodium mobility in urban airborne particulate matter (PM10, PM2.5, and PM1) using simulated lung fluids.

    Science.gov (United States)

    Zereini, Fathi; Wiseman, Clare L S; Püttmann, Wilhelm

    2012-09-18

    Environmental concentrations of platinum group elements (PGE) have been increasing since the introduction of automotive catalytic converters to control harmful emissions. Assessments of the human health risks of exposures to these elements, especially through the inhalation of PGE-associated airborne particulate matter (PM), have been hampered by a lack of data on their bioaccessibility. The purpose of this study is to apply in vitro methods using simulated human lung fluids [artificial lysosomal fluid (ALF) and Gamble's solution] to assess the mobility of the PGE, platinum (Pt), palladium (Pd), and rhodium (Rh) in airborne PM of human health concern. Airborne PM samples (PM(10), PM(2.5), and PM(1)) were collected in Frankfurt am Main, Germany. For comparison, the same extraction experiments were conducted using the standard reference material, Used Auto Catalyst (monolith) (NIST 2557). Pt and Pd concentrations were measured using isotope dilution ICP-Q-MS, while Rh was measured directly with ICP-Q-MS (in collision mode with He), following established matrix separation and enrichment procedures, for both solid (filtered residues) and extracted sample phases. The mobilized fractions measured for PGE in PM(10), PM(2.5), and PM(1) were highly variable, which can be attributed to the heterogenic nature of airborne PM and its composition. Overall, the mobility of PGE in airborne PM samples was notable, with a mean of 51% Rh, 22% Pt, and 29% Pd present in PM(1) being mobilized by ALF after 24 h. For PM(1) exposed to Gamble's solution, a mean of 44% Rh, 18% Pt, and 17% Pd was measured in solution after 24 h. The mobility of PGE associated with airborne PM was also determined to be much higher compared to that measured for the auto catalyst standard reference material. The results suggest that PGE emitted from automotive catalytic converters are likely to undergo chemical transformations during and/or after being emitted in the environment. This study highlights the need

  16. Chemical characterization and mass closure of PM10 and PM2.5 at an urban site in Karachi - Pakistan

    Science.gov (United States)

    Shahid, Imran; Kistler, Magdalena; Mukhtar, Azam; Ghauri, Badar M.; Ramirez-Santa Cruz, Carlos; Bauer, Heidi; Puxbaum, Hans

    2016-03-01

    A mass balance method is applied to assess main source contributions to PM2.5 and PM10 levels in Karachi. Carbonaceous species (elemental carbon, organic carbon, carbonate carbon), soluble ions (Ca++, Mg++, Na+, K+, NH4+, Cl-, NO3-, SO4-), saccharides (levoglucosan, galactosan, mannosan, sucrose, fructose, glucose, arabitol and mannitol) were determined in atmospheric fine (PM2.5) and coarse (PM10) aerosol samples collected under pre-monsoon conditions (March-April 2009) at an urban site in Karachi (Pakistan). The concentrations of PM2.5 and PM10 were found to be 75 μg/m3 and 437 μg/m3 respectively. The large difference between PM10 and PM2.5 originated predominantly from mineral dust. "Calcareous dust" and "siliceous dust" were the over all dominating material in PM, with 46% contribution to PM2.5 and 78% to PM10-2.5. Combustion particles and secondary organics (EC + OM) comprised 23% of PM2.5 and 6% of PM10-2.5. EC, as well as OC ambient levels were higher (59% and 56%) in PM10-2.5 than in PM2.5. Biomass burning contributed about 3% to PM2.5, and had a share of about 13% of ;EC + OM; in PM2.5. The impact of bioaerosol (fungal spores) was minor and had a share of 1 and 2% of the OC in the PM2.5 and PM10-2.5 size fractions. In case of secondary inorganic aerosols, ammonium sulphate (NH4)2SO4 contributes 4.4% to PM2.5 and no detectable quantity were found in fraction PM10-2.5. The sea salt contribution is about 2% both to PM2.5 and PM10-2.5.

  17. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  18. The human factor in maintenance work

    International Nuclear Information System (INIS)

    Hansson, B.

    1996-01-01

    In most of the maintenance works performed at operating plants, the personnel is the warranty for both efficient performance and good quality. To reach the right quality level in performance, the personnel needs adequate tools and of course a maintenance strategy and an organisation that supports the efficient work. The human factor is mostly referred to when something went wrong and analyses are done. There is a great potential of doing preventive analysis. The presentation will focus on experience in this field and what has been done at Barsebaeck NPP to analyse and improve the maintenance work. As maintenance work can't be seen as an isolated area, the rest of the plant organisation is included in the presentation. (author) figs., tabs

  19. DATMAN: A reliability data analysis program using Bayesian updating

    International Nuclear Information System (INIS)

    Becker, M.; Feltus, M.A.

    1996-01-01

    Preventive maintenance (PM) techniques focus on the prevention of failures, in particular, system components that are important to plant functions. Reliability-centered maintenance (RCM) improves on the PM techniques by introducing a set of guidelines by which to evaluate the system functions. It also minimizes intrusive maintenance, labor, and equipment downtime without sacrificing system performance when its function is essential for plant safety. Both the PM and RCM approaches require that system reliability data be updated as more component failures and operation time are acquired. Systems reliability and the likelihood of component failures can be calculated by Bayesian statistical methods, which can update these data. The DATMAN computer code has been developed at Penn State to simplify the Bayesian analysis by performing tedious calculations needed for RCM reliability analysis. DATMAN reads data for updating, fits a distribution that best fits the data, and calculates component reliability. DATMAN provides a user-friendly interface menu that allows the user to choose from several common prior and posterior distributions, insert new failure data, and visually select the distribution that matches the data most accurately

  20. Relationships of relative humidity with PM2.5 and PM10 in the Yangtze River Delta, China.

    Science.gov (United States)

    Lou, Cairong; Liu, Hongyu; Li, Yufeng; Peng, Yan; Wang, Juan; Dai, Lingjun

    2017-10-23

    Severe particulate matter (PM, including PM 2.5 and PM 10 ) pollution frequently impacts many cities in the Yangtze River Delta (YRD) in China, which has aroused growing concern. In this study, we examined the associations between relative humidity (RH) and PM pollution using the equal step-size statistical method. Our results revealed that RH had an inverted U-shaped relationship with PM 2.5 concentrations (peaking at RH = 45-70%), and an inverted V-shaped relationship (peaking at RH = 40 ± 5%) with PM 10 , SO 2 , and NO 2 . The trends of polluted-day number significantly changed at RH = 70%. The very-dry (RH humidity (RH = 60-70%) conditions positively affected PM 2.5 and exerted an accumulation effect, while the mid-humidity (RH = 70-80%), high-humidity (RH = 80-90%), and extreme-humidity (RH = 90-100%) conditions played a significant role in reducing particle concentrations. For PM 10 , the accumulation and reduction effects of RH were split at RH = 45%. Moreover, an upward slope in the PM 2.5 /PM 10 ratio indicated that the accumulation effects from increasing RH were more intense on PM 2.5 than on PM 10 , while the opposite was noticed for the reduction effects. Secondary transformations from SO 2 and NO 2 to sulfate and nitrate were mainly responsible for PM 2.5 pollution, and thus, controlling these precursors is effective in mitigating the PM pollution in the YRD, especially during winter. The conclusions in this study will be helpful for regional air-quality management.

  1. Analysis of PM10, PM2.5, and PM2 5-10 concentrations in Santiago, Chile, from 1989 to 2001.

    Science.gov (United States)

    Koutrakis, Petros; Sax, Sonja N; Sarnat, Jeremy A; Coull, Brent; Demokritou, Phil; Oyola, Pedro; Garcia, Javier; Gramsch, Ernesto

    2005-03-01

    Daily particle samples were collected in Santiago, Chile, at four urban locations from January 1, 1989, through December 31, 2001. Both fine PM with da Ambient Air Quality Standards and the European Union concentration limits. Mean PM2.5 levels during the cold season (April through September) were more than twice as high as those observed in the warm season (October through March); whereas coarse particle levels were similar in both seasons. PM concentration trends were investigated using regression models, controlling for site, weekday, month, wind speed, temperature, and RH. Results showed that PM2.5 concentrations decreased substantially, 52% over the 12-year period (1989-2000), whereas PM2.5-10 concentrations increased by approximately 50% in the first 5 years and then decreased by a similar percentage over the following 7 years. These decreases were evident even after controlling for significant climatic effects. These results suggest that the pollution reduction programs developed and implemented by the Comisión Nacional del Medio Ambiente (CONAMA) have been effective in reducing particle levels in the Santiago Metropolitan region. However, particle levels remain high and it is thus imperative that efforts to improve air quality continue.

  2. Filling machine preventive maintenance using age replacement method in PT Lucas Djaja

    Directory of Open Access Journals (Sweden)

    Mustofa Fifi Herni

    2018-01-01

    Full Text Available PT Lucas Djaja is a company engaged in the pharmaceutical industry which produce sterile drugs and non-sterile. Filling machine has a high failure rate and expensive corrective maintenance cost. PT Lucas Djaja has a policy to perform engine maintenance by way of corrective maintenance. The study focused on the critical components, namely bearing R2, bearing 625 and bearing 626. When the replacement of the failure done by the company is currently using the formula mean time to failure with the result of bearing R2 at point 165 days, bearing 625 at a point 205 days, and bearing 626 at a point 182 days. Solutions generated by using age replacement method with minimization of total maintenance cost given on the bearing R2 at a point 60 days, bearing 625 at the point of 80 days and bearing 626 at a point 40 days.

  3. A VITAL service for predictive MOV maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Motor-operated valve (MOV) maintenance can be a major contributor to unplanned plant downtime, either because valve malfunctions cause unscheduled outages, or because unnecessary valve maintenance lengthens scheduled outages. The cause of both situations is a preventive approach to valve maintenance, where maintenance is scheduled according to a timetable instead of according to a demonstrated need. To move towards a predictive maintenance approach, inexpensive methods of collecting and diagnosing real-time data on the conditions of a valve must be made available. Such a system must be capable of detecting and diagnosing degrading mechanical and electrical behaviour at an early stage, as well as being able to predict the time of failure. Without this data, a predictive approach to maintenance is impossible. Westinghouse is addressing the requirements for a predictive approach to MOV maintenance with the introduction of a third-generation of diagnostic systems for motor-operated valves -the portable Valve Intelligent Test and Analysis System (VITALS) and the on-line Valve Monitoring System (VMS). (author)

  4. 78 FR 24751 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Science.gov (United States)

    2013-04-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting... Control and Prevention (CDC) announces the aforementioned SEP: Time and Date: 12:00 p.m.-3:30 p.m., June...

  5. The impact of long-range-transport on PM1 and PM2.5 at a Central Mediterranean site

    Science.gov (United States)

    Perrone, M. R.; Becagli, S.; Garcia Orza, J. A.; Vecchi, R.; Dinoi, A.; Udisti, R.; Cabello, M.

    2013-06-01

    Water soluble ions, methanesulfonate, organic and elemental carbon, and metals in PM2.5 and PM1 samples were analysed by Positive Matrix Factorization to identify and quantify major sources of fine particles at a Central Mediterranean site. The cluster analysis of four-day back trajectories was used to determine the dependence of PM2.5 and PM1 levels and composition on air-flows. The cluster analysis has identified six, six, and seven distinct air-flow types arriving at 500, 1500, and 3000 m above sea level (asl), respectively. Slow-west (Wslow) and north-eastern (NE) flows at 500 and 1500 m asl were the most frequent and were associated with the highest PM2.5 and PM1 concentrations. The PM concentrations from combustion sources including biomass burning were at their maximum under north-western (NW) flows. Similarly, the ammonium sulphate source was enhanced under Wslow and NE flows. South-eastern Mediterranean Sea air-flows were associated with the highest PM2.5 concentrations due to the heavy-oil-combustion source and the highest PM2.5 and PM1 concentrations due to the secondary marine source. PM2.5 concentrations due to the reacted dust and traffic source and PM1 concentrations due to the nitrate with reacted dust and mixed anthropogenic source showed no clear dependence on air-flows. This work highlights the different impact of aerosol sources on PM2.5 and PM1 fractions, being PM1 more adequate to control anthropogenic emissions from combustion sources.

  6. Maintenance Optimization of High Voltage Substation Model

    Directory of Open Access Journals (Sweden)

    Radim Bris

    2008-01-01

    Full Text Available The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized, the failure rate and mean time to repair - MTTR.

  7. Cancer Prevention in the Precision Medicine Era | Division of Cancer Prevention

    Science.gov (United States)

    Speaker | Timothy R. Rebbeck, PhD will present "Cancer Prevention in the Precision Medicine Era" on March 20, 2018, from 11:00 am - 12:00 pm at the NCI Shady Grove Campus. Learn more about this lecture.

  8. Improvement of the preventive maintenance program of an emergency diesel generator set

    International Nuclear Information System (INIS)

    Jacquot, J.P.; Meuwisse, C.; Cailleaux, J.P.

    1995-01-01

    An exhaustive Reliability Centered Maintenance (RCM) analysis was performed of the emergency diesel generator sets in Electricite de France 900-MW nuclear power plants. The first part of this paper describes the Reliability Centered Maintenance approach, including the functional breakdown, complete analysis of operation feedback and safety assessment of the risk induced by functional diesel failures. The second part shows how this kind of RCM analysis can be used to improve the efficiency of periodic tests of the machine, and more generally, the efficiency of condition-directed maintenance tasks. The underlying objective is to minimize risk and aging of the machine

  9. Optimal Maintenance of a Production System with Intermediate Buffers

    Directory of Open Access Journals (Sweden)

    Constantinos C. Karamatsoukis

    2012-01-01

    Full Text Available We consider a production-inventory system that consists of an input-generating installation, a production unit and L intermediate buffers. It is assumed that the installation transfers the raw material to buffer and the production unit pulls the raw material from buffer We consider the problem of the optimal preventive maintenance of the installation if the installation deteriorates stochastically with usage and the production unit is always in operative condition. We also consider the problem of the optimal preventive maintenance of the production unit if the production unit deteriorates stochastically with usage and the installation is always in operative condition. Under a suitable cost structure and for given contents of the buffers, it is proved that the average-cost optimal policy for the first (second problem initiates a preventive maintenance of the installation (production unit if and only if the degree of deterioration of the installation (production unit exceeds some critical level. Numerical results are presented for both problems.

  10. A bivariate process model for maintenance and inspection planning

    NARCIS (Netherlands)

    Newby, M.J.; Barker, C.T.

    2006-01-01

    The paper describes decision making about monitoring and maintenance of systems described by a general stochastic process. The system is monitored and preventive and corrective maintenance actions are carried out in response to the observed system state. The decision process is simplified by using

  11. Stochastic maintenance optimization at Candu power plants

    International Nuclear Information System (INIS)

    Doyle, E.K.; Duchesne, T.; Lee, C.G.; Cho, D.I.

    2004-01-01

    The use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems as previously reported at ICONE 6 in New Orleans (1996). Further refinement of the station maintenance strategy was evaluated via the applicability of statistical analysis of historical failure data. The viability of stochastic methods in Candu maintenance was illustrated at ICONE 10 in Washington DC (2002). The next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principal impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. The current reality of global competition necessitates the pursuit of all financial optimizers. The next construction phase in the power generation industry will soon begin on a worldwide basis. With the relatively high initial capital cost of new nuclear generation all possible avenues of financial optimization must be evaluated and implemented. (authors)

  12. Physicochemical properties, in vitro cytotoxic and genotoxic effects of PM1.0 and PM2.5 from Shanghai, China.

    Science.gov (United States)

    Zou, Yajuan; Wu, Yizhao; Wang, Yali; Li, Yinsheng; Jin, Chengyu

    2017-08-01

    Exposure to ambient particulate matter (PM) links with a variety of respiratory diseases. However, compared with coarse particles (PM 10 ) and fine particles (PM 2.5 ), submicrometer particles (PM 1.0 ) may be a more important indicator of human health risks. In this study, the cytotoxic and genotoxic effects of PM 1.0 samples from Shanghai were examined using A549 cells, and compared with the effects of PM 2.5 , to better understand the health effects of PM 1.0 in this area. The PM 1.0 and PM 2.5 samples were characterized for morphology, water-soluble inorganic ions, organic and elemental carbon, and metal elements. The cytotoxicity of PMs was measured using cell viability and cell membrane damage assays. The genotoxic effects of PMs were determined using the comet assay, and DNA damage was quantified using olive tail moment (OTM) values. The physicochemical characterization indicated that PM 1.0 was enriched in carbonaceous elements and hazardous metals (Al, Zn, Pb, Mn, Cu, and V), whereas PM 2.5 was more abundant in large, irregular mineral particles. The biological results revealed that both PM 1.0 and PM 2.5 could induce significant cytotoxicity and genotoxicity in A549 cells, and that exposure to PM 1.0 caused more extensive toxic effects than exposure to PM 2.5 . The greater cytotoxic effects of PM 1.0 can be attributed to the combined effects of size and chemical composition, whereas the genotoxic effects of PM 1.0 may be mainly associated with chemical species.

  13. MUTAGENIC AND CYTOTOXIC FACTORS IN PM10 AND PM2.5 FRACTIONS IN ATMOSPHERE IN SOSNOWIEC

    Directory of Open Access Journals (Sweden)

    Agnieszka Kozłowska

    2011-12-01

    Full Text Available Air dust pollution enters human body via respiratory system. Its cytotoxic effect is surveyed using cell lines of mononuclear or pulmonary epithelial cell origins. Mutagenic properties are assessed using short-term assay on Salmonella typhimurium bacterial strains. Mutagenic and cytotoxic properties of air dust pollution – fractions PM10 and PM2.5, which were collected in autumn and in winter, were assessed using Ames test with Salmonella typhimurium strains and MTT cytoxicity assay on mononuclear cell line RAW 264.7, respectively. Samples of dust were collected on glass fiber filters by (Harvard impactor with air flow ca. 9 l/min, splitting samples to the fraction PM10 and PM2.5. Extraction of pollution was carried out using dichlorometane. Extracted samples were dissolved in dimethylsulfoxide (DMSO before analyses. The highest value of mutagenicity ratio (MR was observed in YG1041 strain with metabolic activation by S9 extract in the PM10 sample of dust collected in winter. The lowest one was observed in TA98 strain without activation in the PM2.5 sample of dust collected in autumn. Winter dust samples, both the fractions PM10 and PM2,5, were toxic for TA98 strain in both test conditions (5S9. MTT cytotoxicity assay using mononuclear cell line RAW 264.7 showed that fractions PM10 and PM2.5 collected in winter were of highest toxic properties. The viability of cells, which were treated with samples of 0,312 m3 air, were 1,7% and 1,6%, respectively, while for autumn samples for PM2,5 the viability was 63%.

  14. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  15. Evaluation of implementation an Integrated Safety and Preventive Maintenance System for Improving of Safety Indexes

    Directory of Open Access Journals (Sweden)

    I mohammadfam

    2014-03-01

    Full Text Available Accident analysis shows that one of the main reasons for accidents is non-integration of maintenance units with safety. Merging these two processes through an integrated system can reduce and or eliminate accidents, diseases, and environmental pollution. These issues lead to improvement in organizational performance, as well. The aim of this study is to design and establish an integrated system for obtaining the aforementioned goal. Integration was carried out at Nirou Moharreke Machine Tools Company via Structured System Analysis & Design Method (SSADM. In order to measure the effectiveness of the system, selected indexes were compared using statistical methods prior and after system establishment. Results show that the accident severity index reduced from 135.46 in 2010, to 43.85 in 2012. Moreover, system effectiveness improved equipment reliability and availability (e.g. reliability of the Pfeiffer Milling machine (P (t>50 increased from 0.89 in 2010, to 0.9 in 2012. This system by forecasting various failures, and planning and designing the required operations for preventing occurrence of these failures, plays an important role in improving safety conditions of equipment, and increasing organizational performance, and is capable of presenting an excellent accident prevention program.

  16. On Different Maintenance Strategies for Casted Components of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    . This maintenance tool uses Crude Monte Carlo Simulations to estimate the expected maintenance costs. Corrective and preventive maintenance strategies with a constant inspection interval or a condition monitoring system are considered. Furthermore, transportation from shore to the wind turbines by boat...... and transportation strategy. The case study shows that the maintenance expenses of casted components correspond to roughly 5% of the overall expected maintenance costs when using a corrective maintenance strategy. This amount can be decreased to roughly 2% when using a condition monitoring system and following...

  17. Reduction of power consumption in motor-driven applications by using PM motors; PM = Permanent Magnet; Reduktion af elforbrug til motordrift ved anvendelse af PM motorer

    Energy Technology Data Exchange (ETDEWEB)

    Hvenegaard, C.M.; Hansen, Mads P.R.; Groenborg Nikolaisen, C. (Teknologisk Institut, Taastrup (Denmark)); Nielsen, Sandie B. (Teknologisk Institut, AArhus (Denmark)); Ritchie, E.; Leban, K. (Aalborg Univ., Aalborg (Denmark))

    2009-12-15

    The traditional asynchronous motor with aluminum rotor is today by far the most widespread and sold electric motor, but a new and more energy efficient type of engine - the permanent magnet motor (PM motor) - is expected in the coming years to win larger and larger market shares. Several engine manufacturers in Europe, USA and Asia are now beginning to market the PM motors, which can replace the traditional asynchronous motor. The project aims to uncover the pros and cons of replacing asynchronous motors including EFF1 engines with PM motors, including the price difference. Furthermore, it is identified how the efficiency of PM motors is affected by low load levels and at various forms of control. Finally, the energy savings potential is analysed, by replacing asynchronous motors with PM motors. The study includes laboratory tests of PM motors, made in a test stand at Danish Technological Institute. (ln)

  18. On maintenance management of wind and nuclear power plants

    International Nuclear Information System (INIS)

    Nilsson, Julia

    2009-11-01

    Electrical production in Sweden today is mainly from nuclear and hydro power. However, there is large increase in renewable energy like wind power and the installed new capacity goals are large. Several electrical production sources are important for the sustainability of the energy system. Maintenance is an approach for keeping a system sustainable. The importance of structured maintenance for reliable electrical production systems triggers the development of qualitative and quantitative maintenance management methods. Examples of these methods are Reliability-Centered Maintenance (RCM) which is a structured qualitative approach that focuses on reliability when planning maintenance, and Reliability Centered Asset Management (RCAM) which is a development of RCM into a quantitative approach with the aim to relate preventive maintenance to total maintenance cost and system reliability. This thesis presents models, as applications of RCAM, based on the methods of Life Cycle Cost (LCC) and mathematical optimization, applied to wind and nuclear power plants. Both deterministic and stochastic approaches have been used and the proposed models are based on the Total Cost model, which summarizes costs for maintenance and production loss, and the Aircraft model, which is an opportunistic maintenance optimization model. Opportunistic maintenance is preventive maintenance performed at opportunities. The wind power applications in this study show on different ways to cover costs of condition monitoring systems (CMS) and further on economic benefits of these when uncertainties of times to failure are included in the model. The nuclear power applications show on that the optimization model is dependent on the discount rate and that a high discount rate gives more motivation for opportunistic replacements. When put into a stochastic framework and compared to other maintenance strategies it is shown that an extended opportunistic maintenance optimization model has a good overall

  19. Spatiotemporal estimation of historical PM2.5 concentrations using PM10, meteorological variables, and spatial effect

    Science.gov (United States)

    Li, Lianfa; Wu, Anna H.; Cheng, Iona; Chen, Jiu-Chiuan; Wu, Jun

    2017-10-01

    Monitoring of fine particulate matter with diameter health outcomes such as cancer. In this study, we aimed to design a flexible approach to reliably estimate historical PM2.5 concentrations by incorporating spatial effect and the measurements of existing co-pollutants such as particulate matter with diameter additive non-linear model. The spatiotemporal model was evaluated, using leaving-one-site-month-out cross validation. Our final daily model had an R2 of 0.81, with PM10, meteorological variables, and spatial autocorrelation, explaining 55%, 10%, and 10% of the variance in PM2.5 concentrations, respectively. The model had a cross-validation R2 of 0.83 for monthly PM2.5 concentrations (N = 8170) and 0.79 for daily PM2.5 concentrations (N = 51,421) with few extreme values in prediction. Further, the incorporation of spatial effects reduced bias in predictions. Our approach achieved a cross validation R2 of 0.61 for the daily model when PM10 was replaced by total suspended particulate. Our model can robustly estimate historical PM2.5 concentrations in California when PM2.5 measurements were not available.

  20. Performance-based maintenance of gas turbines for reliable control of degraded power systems

    Science.gov (United States)

    Mo, Huadong; Sansavini, Giovanni; Xie, Min

    2018-03-01

    Maintenance actions are necessary for ensuring proper operations of control systems under component degradation. However, current condition-based maintenance (CBM) models based on component health indices are not suitable for degraded control systems. Indeed, failures of control systems are only determined by the controller outputs, and the feedback mechanism compensates the control performance loss caused by the component deterioration. Thus, control systems may still operate normally even if the component health indices exceed failure thresholds. This work investigates the CBM model of control systems and employs the reduced control performance as a direct degradation measure for deciding maintenance activities. The reduced control performance depends on the underlying component degradation modelled as a Wiener process and the feedback mechanism. To this aim, the controller features are quantified by developing a dynamic and stochastic control block diagram-based simulation model, consisting of the degraded components and the control mechanism. At each inspection, the system receives a maintenance action if the control performance deterioration exceeds its preventive-maintenance or failure thresholds. Inspired by realistic cases, the component degradation model considers random start time and unit-to-unit variability. The cost analysis of maintenance model is conducted via Monte Carlo simulation. Optimal maintenance strategies are investigated to minimize the expected maintenance costs, which is a direct consequence of the control performance. The proposed framework is able to design preventive maintenance actions on a gas power plant, to ensuring required load frequency control performance against a sudden load increase. The optimization results identify the trade-off between system downtime and maintenance costs as a function of preventive maintenance thresholds and inspection frequency. Finally, the control performance-based maintenance model can reduce

  1. Integration of infrared thermography into various maintenance methodologies

    Science.gov (United States)

    Morgan, William T.

    1993-04-01

    Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.

  2. Identification of Optimal Preventive Maintenance Decisions for Composite Components

    NARCIS (Netherlands)

    Laks, P.; Verhagen, W.J.C.; Gherman, B.; Porumbel, I.

    2018-01-01

    This research proposes a decision support tool which identifies cost-optimal maintenance decisions for a given planning period. Simultaneously, the reliability state of the component is kept at or below a given reliability threshold: a failure limit policy applies. The tool is developed to support

  3. THE OFFICIAL AUDIT: THE MAINTENANCE OF THE STRUCTURES AND EQUIPMENTS

    Directory of Open Access Journals (Sweden)

    Claudio Biglia

    2008-12-01

    Full Text Available The author distinguishes the ordinary maintenance in corrective, preventive and predictive maintenance and describes the importance of the verifications of the maintenance procedures of the structures and the equipmentes in the food industy. He individualizes criterions to follow for an aware detective check. This approach offers a greater guarantee of food security and a greater responsibility of OSA

  4. Source apportionment of PM10 and PM2.5 in a desert region in northern Chile

    International Nuclear Information System (INIS)

    Jorquera, Héctor; Barraza, Francisco

    2013-01-01

    Estimating contributions of anthropogenic sources to ambient particulate matter (PM) in desert regions is a challenging issue because wind erosion contributions are ubiquitous, significant and difficult to quantify by using source-oriented, dispersion models. A receptor modeling analysis has been applied to ambient PM 10 and PM 2.5 measured in an industrial zone ∼ 20 km SE of Antofagasta (23.63°S, 70.39°W), a midsize coastal city in northern Chile; the monitoring site is within a desert region that extends from northern Chile to southern Perú. Integrated 24-hour ambient samples of PM 10 and PM 2.5 were taken with Harvard Impactors; samples were analyzed by X Ray Fluorescence, ionic chromatography (NO 3 − and SO 4 = ), atomic absorption (Na + , K + ) and thermal optical transmission for elemental and organic carbon determination. Receptor modeling was carried out using Positive Matrix Factorization (US EPA Version 3.0); sources were identified by looking at specific tracers, tracer ratios, local winds and wind trajectories computed from NOAA's HYSPLIT model. For the PM 2.5 fraction, six contributions were found — cement plant, 33.7 ± 1.3%; soil dust, 22.4 ± 1.6%; sulfates, 17.8 ± 1.7%; mineral stockpiles and brine plant, 12.4 ± 1.2%; Antofagasta, 8.5 ± 1.3% and copper smelter, 5.3 ± 0.8%. For the PM 10 fraction five sources were identified — cement plant, 38.2 ± 1.5%; soil dust, 31.2 ± 2.3%; mineral stockpiles and brine plant, 12.7 ± 1.7%; copper smelter, 11.5 ± 1.6% and marine aerosol, 6.5 ± 2.4%. Therefore local sources contribute to ambient PM concentrations more than distant sources (Antofagasta, marine aerosol) do. Soil dust is enriched with deposition of marine aerosol and calcium, sulfates and heavy metals from surrounding industrial activities. The mean contribution of suspended soil dust to PM 10 is 50 μg/m 3 and the peak daily value is 104 μg/m 3 . For the PM 2.5 fraction, suspended soil dust contributes with an average of 9.3

  5. Improving industrial maintenance contract relationships

    NARCIS (Netherlands)

    De Jong, A.

    2010-01-01

    Unavailability of technical systems, such as aircraft, is expensive. Technical systems require maintenance to prevent and to remedy defects that cause unavailability. Users of technical systems usually bear the consequences of the risk of unavailability, in particular the loss of productivity. This

  6. Measurement of Ambient Air Particle (TSP, PM10, PM2,5) Around Candidate Location of PLTN Semenanjung Lemahabang

    International Nuclear Information System (INIS)

    AgusGindo S; Budi Hari H

    2008-01-01

    Measurement analysis of ambient air particle (TSP, PM 10 , PM 2,5 ) around location candidate of PLTN (Power Station of Nuclear Energy) Semenanjung Lemahabang has been carried out. The measurement was conducted in May 2007 with a purpose to providing information about concentration of ambient air particle (TSP, PM 10 , PM 2,5 ) and diameter distribution of its air particle. The measurement was conducted in three locations i.e. 1). Balong village 2). Bayuran 3). Bondo. Concentration of TSP, PM 10 , and PM 2,5 per 24 hours in all measured locations in area candidate of PLTN exceed quality standard of national ambient air is specified by government. All measurement locations for the TSP, PM 10 , and PM 2,5 was include category of ISPU (Standard Index of Air Pollution) moderate. (author)

  7. To what extent can aerosol water explain the discrepancy between model calculated and gravimetric PM10 and PM2.5?

    Directory of Open Access Journals (Sweden)

    S. G. Tsyro

    2005-01-01

    Full Text Available Inter-comparisons of European air quality models show that regional transport models, including the EMEP (Co-operative Programme for monitoring and evaluation of the long-range transmission of air pollutants in Europe aerosol model, tend to underestimate the observed concentrations of PM10 and PM2.5. Obviously, an accurate representation of the individual aerosol constituents is a prerequisite for adequate calculation of PM concentrations. On the other hand, available measurements on the chemical characterization of ambient particles reveal that full chemical PM mass closure is rarely achieved. The fraction unaccounted for by chemical analysis can comprise as much as 30-40% of gravimetric PM10 or PM2.5 mass. The unaccounted PM mass can partly be due to non-C atoms in organic aerosols and/or due to sampling and measurement artefacts. Moreover, a part of the unaccounted PM mass is likely to consist of water associated with particles. Thus, the gravimetrically measured particle mass does not necessarily represent dry PM10 and PM2.5 mass. This is thought to be one of the reasons for models under-prediction of observed PM, if calculated dry PM10 and PM2.5 concentrations are compared with measurements. The EMEP aerosol model has been used to study to what extent particle-bound water can explain the chemically unidentified PM mass in filter-based particle samples. Water content of PM2.5 and PM10 has been estimated with the model for temperature 20°C and relative humidity 50%, which are conditions required for equilibration of dust-loaded filters according to the Reference method recommended by the European Committee for Standardization (CEN. Model calculations for Europe show that, depending on particle composition, particle-bound water constitutes 20-35% of the annual mean PM10 and PM2.5 concentrations, which is consistent with existing experimental estimates. At two Austrian sites, in Vienna and Streithofen, where daily measurements of PM2.5 mass

  8. A development of maintenance educational support method by using navigation method. Pt. 1. A conceptual design of RHR pump maintenance educational support prototype system

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo; Gouda, Hidenori

    2001-01-01

    The purpose of this research is before hand prevention of the systematic error produced from the fault of command / command system on the different organization in a nuclear power plant, and the individual error of the demand level of maintenance work, and knowledge and experience level of a maintenance worker produced from it being incongruent (mismatch), and generating of the serious accident and a serious trouble. This research attains optimization with the difficulty of maintenance work, and work execution capability, such as the persons concerned (a supervision person, a construction person, work person), and proposes the new 'maintenance educational support technique' which is useful to the improvement in 'work reliability' and 'before hand prevention of a human error' in the maintenance work spot. The main results concerning this research are shown below. (1) In this research, concept design of RHR pump maintenance work educational support prototype system was performed on the basis of the examination result of a process analysis of RHR pump maintenance work, load mapping, a rule base/knowledge base and a data base/filing system. Consequently, when an educator-ed talked with a data base/filing system along with load mapping of maintenance work (Why, How, What), a possibility that it could reach exactly from work start to the sub goal or the last goal and timely was suggested. (2) As a result of classifying 'the difficulty of maintenance work', and man's work execution capability' and comparing the result using SRK (behavior of human) index which Rasmussen proposed, among both, it turns out that difference (inharmonious) arises. The exact presentation of the educational method or educational material which responded to knowledge and experience level of an educational achievement target or an educator-ed can be referred to as being connected with the improvement in work reliability, and before hand prevention of a human error as a result by then, incorporating

  9. Heuristics for the Economic Production Quantity Problem under Restrictions on Production and Maintenance Time

    Directory of Open Access Journals (Sweden)

    Qi Xu

    2016-01-01

    Full Text Available This paper proposes an economic production quantity problem with the maximal production run time and minimal preventive maintenance time over a finite planning horizon. The objective is to find the efficient production and maintenance policy to minimize the total cost composed of production, maintenance, shortages, and holding costs under the restriction on the production run time and the preventive maintenance time. The production and maintenance decisions include the production and maintenance frequencies and the production run and the maintenance time. The variability and the boundedness of the production run and maintenance time make the problem difficult to solve. Two heuristic algorithms are developed using different techniques based on the optimal properties of the relaxed problem. The performance comparison between the two algorithms is illustrated by numerical examples. The numerical results show that, for the most part, there exists a heuristic algorithm which is more effective than the other.

  10. Análisis del origen de PM10 y PM2.5 en Bogotá usando gráficos polares (Analysis of the origin of PM10 and PM2.5 in Bogota by using polar plots

    Directory of Open Access Journals (Sweden)

    Pedro Alejandro García Ávila

    2016-09-01

    Full Text Available Determinar la procedencia de los contaminantes del aire registrados por una red de monitoreo es fundamental para diseñar acciones de prevención y control de la contaminación. Con este fin, se analizaron, mediante la aplicación Openair®, los registros de material particulado (PM10 y PM2.5, velocidad y dirección de los vientos, en 10 estaciones de monitoreo de calidad del aire en Bogotá para el período 2009-2011, encontrándose la influencia de fuentes locales y regionales. Se determinaron altas concentraciones de material particulado relacionadas con velocidades de viento superiores a 5 m/s procedentes del occidente, lo cual sugiere un transporte regional de contaminantes desde los municipios vecinos del occidente de la ciudad (Soacha, Funza, Mosquera, Madrid, hacia su centro geográfico. Estos municipios concentran actividad industrial y transporte pesado de bienes desde y hacia Bogotá. Las fuentes localizadas al interior de la ciudad, en particular aquellas que emplean carbón como combustible y las fuentes móviles que transitan sobre las vías principales, contribuyen a generar altos niveles de material particulado cuando los vientos son débiles, pero en menor magnitud que las fuentes externas. (Abstract. The design of pollution prevention strategies and plans requires information about the origin of the pollutants. In this work, particulate matter (PM10 and PM2.5, wind speed and wind direction records from 10 air quality monitoring stations in Bogota between 2009 and 2011 were analyzed using Openair®. The influence of local and regional sources was established. High concentrations of particulate matter associated with wind speeds exceeding 5 m/s from the West were found, suggesting regional transport from the neighboring municipalities of Soacha, Funza, Mosquera and Madrid, towards its geographic center. These municipalities have a significant industrial activity and heavy transport of goods to and from Bogota. Sources located

  11. Characterization of short- and medium-chain chlorinated paraffins in outdoor/indoor PM10/PM2.5/PM1.0 in Beijing, China.

    Science.gov (United States)

    Huang, Huiting; Gao, Lirong; Xia, Dan; Qiao, Lin; Wang, Runhua; Su, Guijin; Liu, Wenbin; Liu, Guorui; Zheng, Minghui

    2017-06-01

    Persistent organic pollutants (POPs) were listed in the Stockholm Convention, because of their adverse health effects, persistence, bioaccumulation and ubiquitous presence in the environment. Short chain chlorinated paraffins (SCCPs), chlorinated derivatives of n-alkanes, have been listed as candidate POPs under Stockholm Convention. Inhalation uptake was an important exposure pathway for non-occupational adult human and the pollution of particle matter has caused great concern. There are some studies focused on POPs such as polychlorinated biphenyls, polychlorinated dibenzo-p-dioxins and dibenzofurans and polybrominated diphenyl ethers in different size particles. However, there were no studies that discussed CP concentrations in particulate matter (PM) with different sizes. In this study, a total of 30 PM samples were collected both outdoors and indoors at a sampling site in Beijing. These samples were used to investigate the concentrations and distributions of SCCPs and medium chain chlorinated paraffins (MCCPs) in PM fractions of different sizes, and to evaluate inhalation exposure risks. The results showed that the average SCCPs and MCCPs in the outdoor PM 10 were 23.9 and 3.6 ng m -3 , while the mean values in indoor were 61.1 and 6.9 ng m -3 , respectively. The levels of SCCPs and MCCPs in indoor and outdoor were relatively high. SCCP and MCCP concentrations in the indoor PM 10 /PM 2.5 /PM 1.0 samples were higher than the corresponding values in the outdoor, because of the using of some products containing CPs in the indoors, like paints and coatings, leather and rubber products. In both outdoor and indoor air, CPs are mainly associated with particles ≤2.5 μm in diameter. The main homolog groups for both SCCPs and MCCPs were C 10-11 Cl 7-8 . It is assumed that SCCPs in the outdoor and indoor PM samples may mainly derive from the production and use of CP-42 and CP-52. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. Performance measures for world class maintenance

    International Nuclear Information System (INIS)

    Labib, A.W.

    1998-01-01

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a 'real time' environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs

  13. Performance measures for world class maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Labib, A W [Department of Mechanical Engineering, University of Manchester, Institute of Science and Technology, Manchester (United Kingdom)

    1999-12-31

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a `real time` environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs.

  14. Performance measures for world class maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Labib, A.W. [Department of Mechanical Engineering, University of Manchester, Institute of Science and Technology, Manchester (United Kingdom)

    1998-12-31

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a `real time` environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs.

  15. On the performance of the semiempirical quantum mechanical PM6 and PM7 methods for noncovalent interactions

    Science.gov (United States)

    Hostaš, Jiří; Řezáč, Jan; Hobza, Pavel

    2013-05-01

    In this Letter, we compare the recently released semiempirical method PM7 with its predecessor, PM6 with post-SCF corrections. These corrections were introduced in order to improve the description of noncovalent interactions (dispersion, hydrogen bonds and halogen bonds) and have become an integral part of PM7. A large collection of data on noncovalent interactions, covering not only interaction energies but also conformational changes and geometries, is used as a benchmark. Among the methods tested, PM6 with the latest corrections (PM6-D3H4X) yields the best results. PM7 yields only slightly worse results but brings additional improvements in the description of other molecular properties.

  16. Maintenance program, organization and procedures

    International Nuclear Information System (INIS)

    Schegk, J.R.R.

    1986-01-01

    The Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) operates two pressurized water reactors (PWR) with 1.200 MW and 1.300 MW and two boiling water reactors (BWR) with an electrical output of 1.300 MW each. The PWR were commissioned in 1975 and 1977 respectively and have so far achieved a cumulative availability of 72%. The BWR started operating in 1984 and 1985. Since than they have been generating with a cumulative availability of 88%. The reliability of the nuclear power stations resulted in a trouble-free operation. For the last two years, the unscheduled non-availability amounted to 3,7% and 6,5% for the PWR and the BWR respectively. These favourable operating results derive inter alia from systematic preventive maintenance and consistent outage management. Apart from the personnel structure in the power stations the functional sequence of planning, control, performance as well as evaluation of maintenance results constitute a closed cycle. In order to ensure and support an effective cooperation of the above mentioned four functional sequences of a cycle, uniform and computer-assisted information and planning aids have been introduced such as task lists, job ordering, time scheduling and materials management. As a result of this preventive maintenance system the average refueling outage period is 35 to 42 days. (orig.)

  17. Planning of maintenance of electrical equipment in nuclear plants/laboratories [Paper No.: VB-3

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Bhattacharyya, A.K.

    1981-01-01

    Satisfactory operating performance of electrical systems ensures continuous availability of power to the various plants and machinery in nuclear plant and laboratories. For effective optimal functioning of the electrical equipment and to reduce their down time, scheduled planning of maintenance to the equipment is essential. Maintenance of power plant, nuclear or fossil, and industrial plant and research laboratories demands essential ingredients such as right type of trained and motivated technical personnel, adoption of standard procedures for maintenance, adequate safety and protection for equipment, safety procedures adopted in the installation to prevent hazards to the workers, provision of adequate stores and inventories, facilities for quick repairs and testing of equipment and effective planning of procedures for their maintenance. While breakdown maintenance allows equipment to operate before it is repaired or replaced, preventive maintenance makes use of scheduled inspection and periodical equipment overhaul and has little value for predicting future continuous performances of equipment. The engineered maintenance is most advantageous and offers maximum operating time to reduce down time of the equipment while adding predictive testing technique to aid in determining the frequency of overhaul of equipment. The important checks to be conducted and preventive maintenance programme to be scheduled are discussed in this paper. The safety and reliable functioning of the electrical equipment depend on proper optimal design, selection of equipment, their installation, subsequent maintenance and strict compliance with safety regulations. (author)

  18. Double-Shell Tank (DST) Maintenance and Recovery Subsystem Definition Report

    International Nuclear Information System (INIS)

    SMITH, E.A.

    2000-01-01

    The description of the Double-Shell Tank (DST) Maintenance and Recovery Subsystem presented in this document was developed to establish its boundaries. The DST Maintenance and Recovery Subsystem consists of new and existing equipment and facilities used to provide tank farm operators logistic support and problem resolution for the DST System during operations. This support will include evaluating equipment status, performing preventive and corrective maintenance, developing work packages, managing spares and consumables, supplying tooling, and training maintenance and operations personnel

  19. A Grounded Theory Study of Aircraft Maintenance Technician Decision-Making

    Science.gov (United States)

    Norcross, Robert

    Aircraft maintenance technician decision-making and actions have resulted in aircraft system errors causing aircraft incidents and accidents. Aircraft accident investigators and researchers examined the factors that influence aircraft maintenance technician errors and categorized the types of errors in an attempt to prevent similar occurrences. New aircraft technology introduced to improve aviation safety and efficiency incur failures that have no information contained in the aircraft maintenance manuals. According to the Federal Aviation Administration, aircraft maintenance technicians must use only approved aircraft maintenance documents to repair, modify, and service aircraft. This qualitative research used a grounded theory approach to explore the decision-making processes and actions taken by aircraft maintenance technicians when confronted with an aircraft problem not contained in the aircraft maintenance manuals. The target population for the research was Federal Aviation Administration licensed aircraft and power plant mechanics from across the United States. Nonprobability purposeful sampling was used to obtain aircraft maintenance technicians with the experience sought in the study problem. The sample population recruitment yielded 19 participants for eight focus group sessions to obtain opinions, perceptions, and experiences related to the study problem. All data collected was entered into the Atlas ti qualitative analysis software. The emergence of Aircraft Maintenance Technician decision-making themes regarding Aircraft Maintenance Manual content, Aircraft Maintenance Technician experience, and legal implications of not following Aircraft Maintenance Manuals surfaced. Conclusions from this study suggest Aircraft Maintenance Technician decision-making were influenced by experience, gaps in the Aircraft Maintenance Manuals, reliance on others, realizing the impact of decisions concerning aircraft airworthiness, management pressures, and legal concerns

  20. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  1. Methods and tools in development in the field of maintenance; Methodes et outils pour la maintenance en cours de developpement

    Energy Technology Data Exchange (ETDEWEB)

    Le Reverend, D.; Tortolano, M. [Electricite de France (EDF/RD), 78 - Chatou (France); Leniaud, F. [Electricite de France (EDF), Div. Production Nuleaire, 93 - Saint-Denis (France)

    2004-07-01

    This article is dedicated to the maintenance strategy followed by EDF for its nuclear power plants. This strategy is based on the American method RCM (reliability centered method) that has been extended to passive components such as structures and relies on 4 axis. The first axis can be defined as the optimization of maintenance with regard to safety, outage and costs. The aim is to set the border between preventive maintenance and remedial maintenance. The second axis is the condition based maintenance that is the maintenance action that is triggered by the real state of the equipment. This type of maintenance implies the search for reliable and accurate diagnostics. The third axis is the design of simulation and planning tools required for the management of the moving of tools, machinery and spare-parts on a maintenance work site. The fourth axis is the design of tools able to repair some important equipment, this way may be a valid alternative to the replacement of equipment in terms of cost and outage time. (A.C.)

  2. PFP up-right lift UL-20/26 manlifts

    Energy Technology Data Exchange (ETDEWEB)

    Morley, J.M.

    1994-11-09

    This Technical Evaluation of Equipment Maintenance (TEEM) is provided principally to document vendor suggested maintenance requirements and deviations from vendor suggested requirements, and provide documentation to support PM procedures. As additional maintenance activities are identified, they will be documented in later revisions. This TEEM is applicable to four single-person manlifts. The report documents preventive maintenance evaluations, semi-annual checks, safety rules before the use of the manlifts, and routine service checks.

  3. PFP up-right lift UL-20/26 manlifts

    International Nuclear Information System (INIS)

    Morley, J.M.

    1994-01-01

    This Technical Evaluation of Equipment Maintenance (TEEM) is provided principally to document vendor suggested maintenance requirements and deviations from vendor suggested requirements, and provide documentation to support PM procedures. As additional maintenance activities are identified, they will be documented in later revisions. This TEEM is applicable to four single-person manlifts. The report documents preventive maintenance evaluations, semi-annual checks, safety rules before the use of the manlifts, and routine service checks

  4. Source contributions to PM2.5 and PM10 at an urban background and a street location

    NARCIS (Netherlands)

    Keuken, M. P.; Moerman, M.; Voogt, M.; Blom, M.; Weijers, E. P.; Rockmann, T.; Dusek, U.

    The contribution of regional, urban and traffic sources to PM2.5 and PM10 in an urban area was investigated in this study. The chemical composition of PM2.5 and PM10 was measured over a year at a street location and up- and down-wind of the city of Rotterdam, the Netherlands. The C-14 content in EC

  5. Source contributions to PM2.5 and PM10 at an urban background and a street location

    NARCIS (Netherlands)

    Keuken, M.P.; Moerman, M.M.; Voogt, M.H.

    2013-01-01

    The contribution of regional, urban and traffic sources to PM2.5 and PM10 in an urban area was investigated in this study. The chemical composition of PM2.5 and PM10 was measured over a year at a street location and up- and down-wind of the city of Rotterdam, the Netherlands. The 14C content in EC

  6. 40 CFR 1065.145 - Gaseous and PM probes, transfer lines, and sampling system components.

    Science.gov (United States)

    2010-07-01

    ... Scrubber. You may use ammonia scrubbers for any or all gaseous sampling systems to prevent interference.... Follow the ammonia scrubber manufacturer's recommendations or use good engineering judgment in applying ammonia scrubbers. (f) Optional sample-conditioning components for PM sampling. You may use the following...

  7. Research on PM2.5 time series characteristics based on data mining technology

    Science.gov (United States)

    Zhao, Lifang; Jia, Jin

    2018-02-01

    With the development of data mining technology and the establishment of environmental air quality database, it is necessary to discover the potential correlations and rules by digging the massive environmental air quality information and analyzing the air pollution process. In this paper, we have presented a sequential pattern mining method based on the air quality data and pattern association technology to analyze the PM2.5 time series characteristics. Utilizing the real-time monitoring data of urban air quality in China, the time series rule and variation properties of PM2.5 under different pollution levels are extracted and analyzed. The analysis results show that the time sequence features of the PM2.5 concentration is directly affected by the alteration of the pollution degree. The longest time that PM2.5 remained stable is about 24 hours. As the pollution degree gets severer, the instability time and step ascending time gradually changes from 12-24 hours to 3 hours. The presented method is helpful for the controlling and forecasting of the air quality while saving the measuring costs, which is of great significance for the government regulation and public prevention of the air pollution.

  8. Local PM10 and PM2.5 emission inventories from agricultural tillage and harvest in northeastern China.

    Science.gov (United States)

    Chen, Weiwei; Tong, Daniel Q; Zhang, Shichun; Zhang, Xuelei; Zhao, Hongmei

    2017-07-01

    Mineral particles or particulate matters (PMs) emitted during agricultural activities are major recurring sources of atmospheric aerosol loading. However, precise PM inventory from agricultural tillage and harvest in agricultural regions is challenged by infrequent local emission factor (EF) measurements. To understand PM emissions from these practices in northeastern China, we measured EFs of PM 10 and PM 2.5 from three field operations (i.e., tilling, planting and harvesting) in major crop production (i.e., corn and soybean), using portable real-time PM analyzers and weather station data. County-level PM 10 and PM 2.5 emissions from agricultural tillage and harvest were estimated, based on local EFs, crop areas and crop calendars. The EFs averaged (107±27), (17±5) and 26mg/m 2 for field tilling, planting and harvesting under relatively dry conditions (i.e., soil moisture agricultural dust emissions to regional air quality in northeastern China. Copyright © 2016. Published by Elsevier B.V.

  9. Source contributions to PM2.5 and PM10 at an urban background and a street location

    Science.gov (United States)

    Keuken, M. P.; Moerman, M.; Voogt, M.; Blom, M.; Weijers, E. P.; Röckmann, T.; Dusek, U.

    2013-06-01

    The contribution of regional, urban and traffic sources to PM2.5 and PM10 in an urban area was investigated in this study. The chemical composition of PM2.5 and PM10 was measured over a year at a street location and up- and down-wind of the city of Rotterdam, the Netherlands. The 14C content in EC and OC concentrations was also determined, to distinguish the contribution from "modern" carbon (e.g., biogenic emissions, biomass burning and wildfires) and fossil fuel combustion. It was concluded that the urban background of PM2.5 and PM10 is dominated by the regional background, and that primary and secondary PM emission by urban sources contribute less than 15%. The 14C analysis revealed that 70% of OC originates from modern carbon and 30% from fossil fuel combustion. The corresponding percentages for EC are, respectively 17% and 83%. It is concluded that in particular the urban population living in street canyons with intense road traffic has potential health risks. This is due to exposure to elevated concentrations of a factor two for EC from exhaust emissions in PM2.5 and a factor 2-3 for heavy metals from brake and tyre wear, and re-suspended road dust in PM10. It follows that local air quality management may focus on local measures to street canyons with intense road traffic.

  10. Water soluble organic carbon in aerosols (PM1, PM2.5, PM10) and various precipitation forms (rain, snow, mixed) over the southern Baltic Sea station.

    Science.gov (United States)

    Witkowska, Agnieszka; Lewandowska, Anita U

    2016-12-15

    In the urbanized coastal zone of the Southern Baltic, complex measurements of water soluble organic carbon (WSOC) were conducted between 2012 and 2015, involving atmospheric precipitation in its various forms (rain, snow, mixed) and PM1, PM2.5 and PM10 aerosols. WSOC constituted about 60% of the organic carbon mass in aerosols of various sizes. The average concentration of WSOC was equal to 2.6μg∙m -3 in PM1, 3.6μg∙m -3 in PM2.5 and 4.4μg∙m -3 in PM10. The lowest concentration of WSOC was noted in summer as a result of effective removal of this compound with rainfall. The highest WSOC concentrations in PM2.5 and PM10 aerosols were measured in spring, which should be associated with developing vegetation on land and in the sea. On the other hand, the highest WSOC concentrations in PM1 occurred in winter at low air temperatures and greatest atmospheric stability, when there were increased carbon emissions from fuel combustion in the communal-utility sector and from transportation. WSOC concentrations in precipitation were determined by its form. Mixed precipitation turned out to be the richest in soluble organic carbon (5.1mg·dm -3 ), while snow contained the least WSOC (1.7mg·dm -3 ). Snow and rain cleaned carbon compounds from the atmosphere more effectively when precipitation lasted longer than 24h, while in the case of mixed precipitation WSOC was removed most effectively within the first 24h. Copyright © 2016 Elsevier B.V. All rights reserved.

  11. Different Transportation and Maintenance Strategies for Offshore Wind Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    as different maintenance strategies are considered. The report contains a case study where the presented approach is applied to a wind turbine farm and a sensitivity study of the different parameters like the operational range of the boat/helicopter, the electricity price, real rate of interest, inspection......Inspections as well as transportation of personnel and repair parts are a significant contributor to the levelized cost of energy for offshore wind turbines. There are different operation and maintenance (O&M) strategies for offshore wind turbines. Maintenance can be performed preventively...... of energy using different maintenance and transportation strategies....

  12. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength and stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation

  13. Levels of PM2.5/PM10 and associated metal(loid)s in rural households of Henan Province, China.

    Science.gov (United States)

    Wu, Fuyong; Wang, Wei; Man, Yu Bon; Chan, Chuen Yu; Liu, Wenxin; Tao, Shu; Wong, Ming Hung

    2015-04-15

    Although a majority of China's rural residents use solid fuels (biomass and coal) for household cooking and heating, clean energy such as electricity and liquid petroleum gas is becoming more popular in the rural area. Unfortunately, both solid fuels and clean energy could result in indoor air pollution. Daily respirable particulate matter (PM≤10 μm) and inhalable particulate matter (PM≤2.5 μm) were investigated in kitchens, sitting rooms and outdoor area in rural Henan during autumn (Sep to Oct 2012) and winter (Jan 2013). The results showed that PM (PM2.5 and PM10) and associated metal(loid)s varied among the two seasons and the four types of domestic energy used. Mean concentrations of PM2.5 and PM10 in kitchens during winter were 59.2-140.4% and 30.5-145.1% higher than those during autumn, respectively. Similar with the trends of PM2.5 and PM10, concentrations of As, Pb, Zn, Cd, Cu, Ni and Mn in household PM2.5 and PM10 were apparently higher in winter than those in autumn. The highest mean concentrations of PM2.5 and PM10 (368.5 and 588.7 μg m(-3)) were recorded in sitting rooms in Baofeng during winter, which were 5.7 and 3.9 times of corresponding health based guidelines for PM2.5 and PM10, respectively. Using coal can result in severe indoor air pollutants including PM and associated metal(loid)s compared with using crop residues, electricity and gas in rural Henan Province. Rural residents' exposure to PM2.5 and PM10 would be roughly reduced by 13.5-22.2% and 8.9-37.7% via replacing coal or crop residues with electricity. The present study suggested that increased use of electricity as domestic energy would effectively improve indoor air quality in rural China. Copyright © 2015 Elsevier B.V. All rights reserved.

  14. Influence of PM1 and PM2.5 on lung function parameters in healthy schoolchildren-a panel study.

    Science.gov (United States)

    Zwozdziak, A; Sówka, I; Willak-Janc, E; Zwozdziak, J; Kwiecińska, K; Balińska-Miśkiewicz, W

    2016-12-01

    To evaluate lung function responses to short-term indoor PM 1 and PM 2.5 concentrations, we conducted a panel study of healthy schoolchildren aged 13-14 years. The following lung function parameters FVC, FEV 1 , PEF, and mid expiratory flows MEF 25 , MEF 50 , and MEF 75 were measured in 141 schoolchildren of the secondary school in Wroclaw, Poland in years 2009-2010. On days when spirometry tests were conducted, simultaneously, PM 1 and PM 2.5 samples were collected inside the school premises. Information about differentiating factors for children including smoking parents, sex, living close to busy streets, dust, mold, and pollen allergies were collected by means of questionnaires. To account for repeated measurements, the method of generalized estimating equations (GEE) was used. The GEE models for the entire group of children revealed the adverse effects (p < 0.05) of PM 1 and PM 2.5 . Small differences in effects estimates per interquartile range (IQR) of PM 1 and PM 2.5 on MEF 25 (5.1 and 4.8 %), MEF 50 (3.7 and 3.9 %), MEF 75 (3.5 and 3.6 %) and FEV 1 (1.3 and 1.0 %) imply that PM 1 was likely the component of PM 2.5 that might have a principal health effect on these lung function parameters. However, the reduction of FVC and PEF per IQR for PM 2.5 (2.1 and 5.2 %, respectively) was higher than for PM 1 (1.0 and 4.4 %, respectively). Adjustment for potential confounders did not change the unadjusted analysis.

  15. [Characterization of water-soluble inorganic ions in PM2.5 and PM1.0 in summer in Guangzhou].

    Science.gov (United States)

    Tao, Jun; Zhang, Ren-jian; Dong, Lin; Zhang, Tao; Zhu, Li-hua; Han, Jing-lei; Xu, Zhen-cheng

    2010-07-01

    PM2.5 and PM1.0 samples were collected simultaneously during July of 2008 in Guangzhou. The concentrations of water-soluble inorganic ions (Na+, NH4+, K+, Mg2+, Ca2+, F-, Cl-, NO3-, and SO4(2-)) were determined by ion chromatography. Meteorological parameters, atmospheric scattering, visibility, and concentrations of trace gases (SO2, NO2, and O3) for this period were also recorded. The results showed the total water-soluble inorganic ions concentrations were (25.5 +/- 10.9) microg x m(-1) and (22. 7 +/- 10.5) microg x m(-3) in PM2.5 and PM1.0, which occupied (47.9 +/- 4.3)% and (49.3 +/- 4.3)% of PM mass respectively. Sulfate was the most abundant ion and contributed (25.8 +/- 4.0)% of PM2.5 mass and (27.5 +/- 4.5)% of PM1.0 mass respectively. High temperature and high ozone level favored the formation of sulfate from sulfur dioxide, while the high relative humidity favored the formation of nitrate were observed. Moreover, sulfate, nitrate, and ammonium in PM2.5 and PM1.0 had great impact on the scattering coefficient and visibility degradation.

  16. Initiating stochastic maintenance optimization at Candu Power Plants

    International Nuclear Information System (INIS)

    Doyle, E.K.

    2003-01-01

    As previously reported at ICONE 6 in New Orleans (1996), the use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Further cost refinement of the station maintenance strategy is being evaluated via the applicability of statistical analysis of historical failure data. Since the statistical evaluation was initiated in 1999 significant progress has been made in demonstrating the viability of stochastic methods in Candu maintenance. Some of the relevant results were presented at ICONE 10 in Washington DC (2002). Success with the graphical displays and the relatively easy to implement stochastic computer programs was sufficient to move the program along to the next significant phase. This next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principle impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. (author)

  17. Guide for generic application of Reliability Centered Maintenance (RCM) recommendations

    International Nuclear Information System (INIS)

    Schwan, C.A.; Toomey, G.E.; Morgan, T.A.; Darling, S.S.

    1991-02-01

    Previously completed reliability centered maintenance (RCM) studies form the basis for developing or refining a preventive maintenance program. This report describes a generic methodology that will help utilities optimize nuclear plant maintenance programs using RCM techniques. This guide addresses the following areas: history of the generic methodology development process, and use of the generic methodology for conducting system-to-system and component-to-component evaluations. 2 refs., 2 figs., 5 tabs

  18. Precise measurement of the $K^{\\pm} \\to \\pi^{\\pm}e^{+}e^{−}$ decay

    CERN Document Server

    Batley, J.R.; Kalmus, G.; Lazzeroni, C.; Munday, D.J.; Slater, M.W.; Wotton, S.A.; Arcidiacono, R.; Bocquet, G.; Cabibbo, N.; Ceccucci, A.; Cundy, D.; Falaleev, V.; Fidecaro, M.; Gatignon, L.; Gonidec, A.; Kubischta, W.; Norton, A.; Maier, A.; Patel, M.; Peters, A.; Balev, S.; Frabetti, P.L.; Goudzovski, E.; Hristov, P.; Kekelidze, V.; Kozhuharov, V.; Litov, L.; Madigozhin, D.; Marinova, E.; Molokanova, N.; Polenkevich, I.; Potrebenikov, Yu.; Stoynev, S.; Zinchenko, A.; Monnier, E.; Swallow, E.; Winston, R.; Rubin, P.; Walker, A.; Baldini, W.; Cotta Ramusino, A.; Dalpiaz, P.; Damiani, C.; Fiorini, M.; Gianoli, A.; Martini, M.; Petrucci, F.; Savrie, M.; Scarpa, M.; Wahl, H.; Bizzeti, A.; Calvetti, M.; Celeghini, E.; Iacopini, E.; Lenti, M.; Martelli, F.; Ruggiero, G.; Veltri, M.; Behler, M.; Eppard, K.; Kleinknecht, K.; Marouelli, P.; Masetti, L.; Moosbrugger, U.; Morales Morales, C.; Renk, B.; Wache, M.; Wanke, R.; Winhart, A.; Coward, D.; Dabrowski, A.; Fonseca Martin, T.; Shieh, M.; Szleper, M.; Velasco, M.; Wood, M.D.; Anzivino, G.; Cenci, P.; Imbergamo, E.; Nappi, A.; Pepe, M.; Petrucci, M.C.; Piccini, M.; Raggi, M.; Valdata-Nappi, M.; Cerri, C.; Fantechi, R.; Collazuol, G.; DiLella, L.; Lamanna, G.; Mannelli, I.; Michetti, A.; Costantini, F.; Doble, N.; Fiorini, L.; Giudici, S.; Pierazzini, G.; Sozzi, M.; Venditti, S.; Bloch-Devaux, B.; Cheshkov, C.; Cheze, J.B.; De Beer, M.; Derre, J.; Marel, G.; Mazzucato, E.; Peyaud, B.; Vallage, B.; Holder, M.; Ziolkowski, M.; Bifani, S.; Biino, C.; Cartiglia, N.; Clemencic, M.; Goy Lopez, S.; Marchetto, F.; Dibon, H.; Jeitler, M.; Markytan, M.; Mikulec, I.; Neuhofer, G.; Widhalm, L.

    2009-01-01

    A sample of 7253 $K^\\pm\\to\\pi^\\pm e^+e^-(\\gamma)$ decay candidates with 1.0% background contamination has been collected by the NA48/2 experiment at the CERN SPS, allowing a precise measurement of the decay properties. The branching ratio in the full kinematic range was measured to be ${\\rm BR}=(3.11\\pm0.12)\\times 10^{-7}$, where the uncertainty includes also the model dependence. The shape of the form factor $W(z)$, where $z=(M_{ee}/M_K)^2$, was parameterized according to several models, and, in particular, the slope $\\delta$ of the linear form factor $W(z)=W_0(1+\\delta z)$ was determined to be $\\delta=2.32\\pm0.18$. A possible CP violating asymmetry of $K^+$ and $K^-$ decay widths was investigated, and a conservative upper limit of $2.1\\times 10^{-2}$ at 90% CL was established.

  19. Human health risk due to variations in PM10-PM2.5 and associated PAHs levels

    Science.gov (United States)

    Sosa, Beatriz S.; Porta, Andrés; Colman Lerner, Jorge Esteban; Banda Noriega, Roxana; Massolo, Laura

    2017-07-01

    WHO (2012) reports that chronic exposure to air pollutants, including particulate matter (PM), causes the death of 7 million people, constituting the most important environmental risk for health in the world. IARC classifies contaminated outdoor air as carcinogenic, Group 1 category. However, in our countries there are few studies regarding air pollution levels and possible associated effects on public health. The current study determined PM and associated polycyclic aromatic hydrocarbons (PAHs) levels in outdoor air, identified their possible emission sources and analysed health risks in the city of Tandil (Argentina). PM10 and PM2.5 samples were collected using a low volume sampler (MiniVol TAS) in three areas: city centre, industrial and residential. Concentrations were determined by gravimetric methods and the content of the US EPA 16 priority PAHs was found by high performance liquid chromatography (HPLC). Description of the main emission sources and selection of monitoring sites resulted from spatial analysis and the IVE (International Vehicle Emissions) model was used in the characterisation of the traffic flow. Median values of 35.7 μgm-3 and 9.6 μgm-3 in PM10 and PM2.5 respectively and characteristic profiles were found for each area. Local values PAHs associated to PM10 and PM2.5, in general, were lower than 10ngm-3. The estimated Unit Risk for the three areas exceeds US EPA standards (9 × 10-5). The number of deaths attributable to short term exposure to outdoor PM10 was 4 cases in children under 5 years of age, and 21 cases in total population, for a relative risk of 1.037.

  20. Spatiotemporal variation of PM1 pollution in China

    Science.gov (United States)

    Chen, Gongbo; Morawska, Lidia; Zhang, Wenyi; Li, Shanshan; Cao, Wei; Ren, Hongyan; Wang, Boguang; Wang, Hao; Knibbs, Luke D.; Williams, Gail; Guo, Jianping; Guo, Yuming

    2018-04-01

    Understanding spatiotemporal variation of PM1 (mass concentrations of particles with aerodynamic diameter health, which is potentially more severe for its deeper penetrating capability into human bodies compared with larger particles. This study aimed to quantify the spatial and temporal distribution of PM1 across China as well as its ratio with PM2.5 (additive models were employed to examine the relationships between PM1 and meteorological parameters. We showed that PM1 concentrations were the lowest in summer and the highest in winter. Across China, the PM1/PM2.5 ratios ranged from 0.75-0.88, reaching higher levels in January and lower in August. For spatial distribution, higher PM1/PM2.5 ratios (>0.9) were observed in North-Eastern China, North China Plain, coastal areas of Eastern China and Sichuan Basin while lower ratios (<0.7) were present in remote areas in North-Western and Northern China (e.g., Xinjiang, Tibet and Inner Mongolia). Higher PM1/PM2.5 ratios were observed on heavily polluted days and lower ratios on clean days. The high PM1/PM2.5 ratios observed in China suggest that smaller particles, PM1 fraction, are key drivers of air pollution, and that they effectively account for the majority of PM2.5 concentrations. This emphasised the role of combustion process and secondary particle formation, the sources of PM1, and the significance of controlling them.

  1. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  2. Program strategies for maintenance management, organization and planning

    International Nuclear Information System (INIS)

    Czegeny, J.I.

    2003-01-01

    In this paper we look respectively at three specific examples showing program strategies for maintenance management, organization and planning. Starting with preventive maintenance optimization, we will look at one Bruce B Predefined task on the Reactor Regulating System to illustrate reduced maintenance requirement, a maintenance management strategy. Next discussed is the organizational strategy at Darlington to have an engineering program meet the jurisdictional requirements for maintaining certification for TSSA registered pressure vessels. The last look-see will show the earned value of the planning for the first Pickering A unit to be returned to service. Finally all the above is tied together in a compare and contrast of what works and what could be improved upon. (author)

  3. Characterization of PM-PEMS for in-use measurements conducted during validation testing for the PM-PEMS measurement allowance program

    Science.gov (United States)

    Khan, M. Yusuf; Johnson, Kent C.; Durbin, Thomas D.; Jung, Heejung; Cocker, David R.; Bishnu, Dipak; Giannelli, Robert

    2012-08-01

    This study provides an evaluation of the latest Particulate Matter-Portable Emissions Measurement Systems (PM-PEMS) under different environmental and in-use conditions. It characterizes four PM measurement systems based on different measurement principles. At least three different units were tested for each PM-PEMS to account for variability. These PM-PEMS were compared with a UC Riverside's mobile reference laboratory (MEL). PM measurements were made from a class 8 truck with a 2008 Cummins diesel engine with a diesel particulate filter (DPF). A bypass around the DPF was installed in the exhaust to achieve a brake specific PM (bsPM) emissions level of 25 mg hp-1h-1. PM was dominated by elemental carbon (EC) during non-regeneration conditions and by hydrated sulfate (H2SO4.6H2O) during regeneration. The photo-acoustic PM-PEMS performed best, with a linear regression slope of 0.90 and R2 of 0.88 during non-regenerative conditions. With the addition of a filter, the photo-acoustic PM-PEMS slightly over reported than the total PM mass (slope = 1.10, R2 = 0.87). Under these same non-regeneration conditions, a PM-PEMS equipped with a quartz crystal microbalance (QCM) technology performed the poorest, and had a slope of 0.22 and R2 of 0.13. Re-tests performed on upgraded QCM PM-PEMS showed a better slope (0.66), and a higher R2 of 0.25. In the case of DPF regeneration, all PM-PEMS performed poorly, with the best having a slope of 0.20 and R2 of 0.78. Particle size distributions (PSD) showed nucleation during regeneration, with a shift of particle size to smaller diameters (˜64 nm to ˜13 nm) with elevated number concentrations when compared to non-regeneration conditions.

  4. Preventative maintenance plan for emergency pumping trailers

    International Nuclear Information System (INIS)

    Wiggins, D.D.

    1994-09-01

    The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ''Single Shell Tank Leak Emergency Pumping Guide.''

  5. Elements of a total MOV maintenance program

    International Nuclear Information System (INIS)

    Lavallee, W.L.

    1989-01-01

    Establishing a good preventive and predictive maintenance program for motor-operated valves (MOVs) is an especially challenging task for nuclear power plants. Because of the sheer number of MOVs involved, all with somewhat different characteristics and requirements, and the extremely critical functions that some of the MOVs perform, the maintenance program quickly becomes a major exercise in coordination. This paper outlines a three-phase approach to achieving a comprehensive MOV maintenance program. It is based on experience in assisting nuclear plants with their MOV programs and encountering many of the pitfalls that can hamper these programs. The three phases include up-front engineering preparation, field diagnostic testing, and maintenance follow-up and trending. Each of these phases is discussed, and a flowchart describing the individual elements of each phase is provided

  6. Ecological Interface Design of Augmented Reality Display for Nuclear Power Plant Maintenance

    International Nuclear Information System (INIS)

    Kim, In; Seong, Poong Hyun

    2008-01-01

    The importance of maintenance in nuclear power plants (NPPs) has been emphasized through many researches. The goals of maintenance in nuclear power plants are not only to reduce the number of shutdowns which directly affects to the profit, but also to prevent accidents or incidents hence improves nuclear safety. It is known that reduction of the rate of human error in maintenance tasks can be achieved if maintenance personnel are properly supported by maintenance support systems. Among many proposed maintenance support system, the use of augmented reality (AR) has been proposed

  7. PENERAPAN MODEL PREVENTIVE MAINTENANCE SMITH DAN DEKKER DI PD. INDUSTRI UNIT INKABA

    Directory of Open Access Journals (Sweden)

    Hari Adianto

    2005-01-01

    Full Text Available The globalization era along with fast development of technology%2C industries must try to increase the quantity and quality of products that they have produced. The development of industrial products which have been increase continually need support from fluency of production process. In this case the industrial companies want a high availability system. PD Industri Unit Inkaba is one of the companies that moves in sector rubber technique industry. The company wants the production process go smoothly so that the company can keeps the existence and increases the product’s quality with cost efficiency and can competes with foreign markets. The smoothness of production process needs support from machines or production’s tools that have good condition. To keep the machines in good condition so that they will in the optimal condition when used%2C then the machines need to be maintained. M.A.J. Smith dan R. Dekker develop a model that combine availability model and preventive maintenance and consider the expected uptime and downtime of the system. This model is a 1 out of n system model%2C which has one operating machine and support by (n – 1 unit machine reserves. A 1 out of n system is also applicable to replaceable components. Smith and Dekker’s model gives the expected uptime and downtime of the system approximation that can gives good approximation of long term average operating cost. The results from decision of component preventive replacement age and optimal number of component reserve are expected to be able to keep the reliability system and be able to avoid the decease of availability system because of maintenance activity. Abstract in Bahasa Indonesia : Dalam era persaingan industri yang semakin global disertai perkembangan teknologi yang pesat%2C industri-industri terus berusaha meningkatkan kuantitas dan kualitas produk yang dihasilkannya. Perkembangan hasil industri yang semakin meningkat secara terus-menerus memerlukan dukungan

  8. Inhalable microorganisms in Beijing's PM2.5 and PM10 pollutants during a severe smog event.

    Science.gov (United States)

    Cao, Chen; Jiang, Wenjun; Wang, Buying; Fang, Jianhuo; Lang, Jidong; Tian, Geng; Jiang, Jingkun; Zhu, Ting F

    2014-01-01

    Particulate matter (PM) air pollution poses a formidable public health threat to the city of Beijing. Among the various hazards of PM pollutants, microorganisms in PM2.5 and PM10 are thought to be responsible for various allergies and for the spread of respiratory diseases. While the physical and chemical properties of PM pollutants have been extensively studied, much less is known about the inhalable microorganisms. Most existing data on airborne microbial communities using 16S or 18S rRNA gene sequencing to categorize bacteria or fungi into the family or genus levels do not provide information on their allergenic and pathogenic potentials. Here we employed metagenomic methods to analyze the microbial composition of Beijing's PM pollutants during a severe January smog event. We show that with sufficient sequencing depth, airborne microbes including bacteria, archaea, fungi, and dsDNA viruses can be identified at the species level. Our results suggested that the majority of the inhalable microorganisms were soil-associated and nonpathogenic to human. Nevertheless, the sequences of several respiratory microbial allergens and pathogens were identified and their relative abundance appeared to have increased with increased concentrations of PM pollution. Our findings may serve as an important reference for environmental scientists, health workers, and city planners.

  9. Development of maintenance engineering system

    International Nuclear Information System (INIS)

    1995-03-01

    Department of JMTR project has developed the Maintenance Engineering System which evaluates the aging tendency of the facilities. The system is used for the repair plan and the replace period of parts, components, equipments or facilities. The system has the data-base which consists of the check data, the inspection data, the trouble data and the repair data at the JMTR since the virgin criticality. The system is utilized maintenance works and concludes the maintenance procedures for the failure components, equipments and facilities. This system has the following characteristics. (1) Anybody can operate the system as easily as word processor. (2) Data are put into by man-machine-interface. (3) The data sheets are with light color and the recognizable arrangements. (4) The system is cost-efficient using commercial personal computers and applications. The research card and the layouts of the input data sheet had been formatted. Data has been begun to be put into the system and to check its functions. The result demonstrates that the system is available for preventive maintenance at the JMTR. (author)

  10. Investigation of air pollution of Shanghai subway stations in ventilation seasons in terms of PM2.5 and PM10.

    Science.gov (United States)

    Guo, Erbao; Shen, Henggen; He, Lei; Zhang, Jiawen

    2017-07-01

    In November 2015, the PM 2.5 and PM 10 particulate matter (PM) levels in platforms, station halls, and rail areas of the Shangcheng and Jiashan Road Station were monitored to investigate air pollution in the Shanghai subway system. The results revealed that in subway stations, PM 2.5 and PM 10 concentrations were significantly higher than those in outdoor environments. In addition, particle concentrations in the platforms exceeded maximum levels that domestic safety standards allowed. Particularly on clear days, PM 2.5 and PM 10 concentrations in platforms were significantly higher than maximum standards levels. Owing to the piston effect, consistent time-varying trends were exhibited by PM 2.5 concentrations in platforms, station halls, and rail areas. Platform particle concentrations were higher than the amount in station halls, and they were higher on clear days than on rainy days. The time-varying trends of PM 10 and PM 2.5 concentrations in platforms and station halls were similar to each other. Activities within the station led to most of the inhalable particles within the station area. The mass concentration ratios of PM 2.5 and PM 10 in platforms were within 0.65-0.93, and fine particles were the dominant components.

  11. Weekly cycle of magnetic characteristics of PM2.5 and PM2.5-10 in Beijing, China

    Science.gov (United States)

    SHI, M.; Wu, H.; Zhang, S.; Li, H.; Yang, T.

    2013-12-01

    In urban areas,fine particle matter with aerodynamic diameter between 2.5 um and 10 um (PM2.5-10), and 2.5 um (PM2.5), as an important source of urban particulate matter (PM) pollutants, have significant negative effects on health, atmospheric visibility and climate. PM has increasingly become a significant index of indicating the atmospheric pollution of city. In recent years, Beijing, China has been listed as one of the most serious air pollution city in the world. In order to investigate the sources of air pollutants, a total of 283 pairs of PM2.5 and PM2.5-10 samples were collected daily from July, 2010 to June, 2011 in Beijing. Mineral magnetic properties and Scanning electron microscope (SEM) observations and energy dispersive X-ray spectroscopy (EDS) analyses of PM2.5 and PM2.5-10 were measured to verify the magnetic materials. Magnetic measures for PM indicated that the major magnetic phase was coarse-grained magnetite-like material. The χlf, χarm, SIRM and χarm/SIRM series of the PM2.5 and PM2.5-10 show seasonal dependences: high values in winter and low values in summer. In additional the parameters analyzed by Time-series methods show a strong cycle about 7 days above 95% confidence level. Weekly cycle of magnetic characteristics of PM2.5 and PM2.5-10 show different pattern: the concentration of magnetic particles in PM2.5-10 show high values in mid-week, and particle sizes is steady, while the concentration of magnetic particles in PM2.5 show reverse a weekly cycle pattern, and particle sizes is smaller in the mid-week.Microscopy analyses reveal basically three morphologies of magnetic grains: aggregate, spherules and angular particles. The ultrafine carbonaceous particles which tend to form complex clusters and chain-like structures, most likely come from coal burning and motor vehicle exhaust. Spherical particles in PM2.5 are dominantly composed of Fe, O and C, grain-diameters of particles range from 0.3 to 2 um. Angular particles of Fe

  12. 78 FR 28221 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Science.gov (United States)

    2013-05-14

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting... aforementioned SEP: Time and Date: 12:30 p.m.-5:00 p.m. EDT, July 24, 2013 (Closed). Place: Teleconference...

  13. Basic statistics of PM2.5 and PM10 in the atmosphere of Mexico City.

    Science.gov (United States)

    Vega, E; Reyes, E; Sánchez, G; Ortiz, E; Ruiz, M; Chow, J; Watson, J; Edgerton, S

    2002-03-27

    The high levels of fine particulate matter in Mexico City are of concern since they may induce severe public health effects as well as the attenuation of visible light. Sequential filter samplers were used at six different sites from 23 February to 22 March 1997. The sampling campaign was carried out as part of the project 'Investigación sobre Materia Particulada y Deterioro Atmosferico-Aerosol and Visibility Evaluation Research'. This research was a cooperative project sponsored by PEMEX and by the US Department of Energy. Sampling sites represent the different land uses along the city, the northwest station, Tlalnepantla, is located in a mixed medium income residential and industrial area. The northeast station, Xalostoc, is located in a highly industrialized area, Netzahualcoyotl is located in a mixed land use area, mainly commercial and residential. Station La Merced is located in the commercial and administrative district downtown. The southwest station is located in the Pedregal de San Angel, in a high-income neighborhood, and the southeast station located in Cerro de la Estrella is a mixed medium income residential and commercial area. Samples were collected four times a day in Cerro de la Estrella (CES), La Merced (MER) and Xalostoc (XAL) with sampling periods of 6 h. In Pedregal (PED), Tlalnepantla (TLA) and Netzahualcoyot1 (NEZ) sampling periods were every 24 h. In this paper the basic statistics of PM2.5 and PM10 mass concentrations are presented. The average results showed that 49, 61, 46, 57, 51 and 44% of the PM10 consisted of PM2.5 for CES, MER, XAL, PED, TLA and NEZ, respectively. The 24-h average highest concentrations of PM25 and PM10 were registered at NEZ (184 and 267 microg/m3) and the lowest at PED (22 and 39 microg/m3). The highest PM10 correlations were between XAL-CES (0.79), PED-TLA (0.80). In contrast, the highest PM2.5 correlations were between CES-PED (0.74), MER-CES (0.73) and TLA-PED (0.72), showing a lower correlation than the PM10

  14. Ionic and carbonaceous compositions of PM10, PM2.5 and PM1.0 at Gosan ABC Superstation and their ratios as source signature

    Directory of Open Access Journals (Sweden)

    S. Kim

    2012-02-01

    Full Text Available PM1.0, PM2.5, and PM10 were sampled at Gosan ABC Superstation on Jeju Island from August 2007 to September 2008. The carbonaceous aerosols were quantified with the thermal/optical reflectance (TOR method, which produced five organic carbon (OC fractions, OC1, OC2, OC3, OC4, and pyrolyzed organic carbon (OP, and three elemental carbon (EC fractions, EC1, EC2, and EC3. The mean mass concentrations of PM1.0, PM2.5, and PM10 were 13.7 μg m−3, 17.2 μg m−3, and 28.4 μg m−3, respectively. The averaged mass fractions of OC and EC were 23.0% and 10.4% for PM1.0, 22.9% and 9.8% for PM2.5, and 16.4% and 6.0% for PM10. Among the OC and EC sub-components, OC2 and EC2+3 were enriched in the fine mode, but OC3 and OC4 in the coarse mode. The filter-based PM1.0 EC agreed well with black carbon (BC measured by an Aethalometer, and PM10 EC was higher than BC, implying less light absorption by larger particles. EC was well correlated with sulfate, resulting in good relationships of sulfate with both aerosol scattering coefficient measured by Nephelometer and BC concentration. Our measurements of EC confirmed the definition of EC1 as char-EC emitted from smoldering combustion and EC2+3 as soot-EC generated from higher-temperature combustion such as motor vehicle exhaust and coal combustion (Han et al., 2010. In particular, EC1 was strongly correlated with potassium, a traditional biomass burning indicator, except during the summer, when the ratio of EC1 to EC2+3 was the lowest. We also found the ratios of major chemical species to be a useful tool to constrain the main sources of aerosols, by which the five air masses were well distinguished: Siberia, Beijing, Shanghai, Yellow Sea, and East Sea types. Except Siberian air, the continental background of the study region, Beijing plumes showed the highest EC1 (and OP to sulfate ratio, which implies that this air mass had the highest net warming by aerosols of the four air masses. Shanghai-type air, which was

  15. Household air pollution and personal inhalation exposure to particles (TSP/PM2.5/PM1.0/PM0.25) in rural Shanxi, North China

    International Nuclear Information System (INIS)

    Huang, Ye; Du, Wei; Chen, Yuanchen; Shen, Guofeng; Su, Shu; Lin, Nan; Shen, Huizhong; Zhu, Dan; Yuan, Chenyi; Duan, Yonghong; Liu, Junfeng; Li, Bengang; Tao, Shu

    2017-01-01

    Personal exposure to size-segregated particles among rural residents in Shanxi, China in summer, 2011 were investigated using portable carried samplers (N = 84). Household air pollution was simultaneously studied using stationary samplers in nine homes. Information on household fuel types, cooking activity, smoking behavior, kitchen ventilation conditions etc., were also collected and discussed. The study found that even in the summer period, the daily average concentrations of PM 2.5 and PM 1.0 in the kitchen were as high as 376 ± 573 and 288 ± 397 μg/m 3 (N = 6), that were nearly 3 times of 114 ± 81 and 97 ± 77 μg/m 3 in the bedroom (N = 8), and significantly higher than those of 64 ± 28 and 47 ± 21 μg/m 3 in the outdoor air (N = 6). The personal daily exposure to PM 2.5 and PM 1.0 were 98 ± 52 and 77 ± 47 μg/m 3 , respectively, that were lower than the concentrations in the kitchen but higher than the outdoor levels. The mass fractions of PM 2.5 in TSP were 90%, 72%, 65% and 68% on average in the kitchen, bedroom, outdoor air and personal inhalation exposure, respectively, and moreover, a majority of particles in PM 2.5 had diameters less than 1.0 μm. Calculated time-weighted average exposure based on indoor and outdoor air concentrations and time spent indoor and outdoor were positively correlated but, was ∼33% lower than the directly measured exposure. The daily exposure among those burning traditional solid fuels could be lower by ∼41% if the kitchen was equipped with an outdoor chimney, but was still 8–14% higher than those household using cleaning energies, like electricity and gas. With a ventilator in the kitchen, the exposure among the population using clean energies could be further reduced by 10–24%. - Highlights: • High inhalation exposure of fine PM 2.5 and PM 1.0 among rural residents. • Smoking prevails on cooking in increasing exposure to finer particles. • PM exposure could be reduced by

  16. Structure of odd-A Pm nuclei (II)

    International Nuclear Information System (INIS)

    Piiparinen, M.; Kortelahti, M.; Pakkanen, A.; Komppa, T.; Komu, R.

    1977-12-01

    The level structures of 141 Pm and 145 Pm were studied by methods of in-beam γ-ray and electron spectroscopy using the reactions 142 Nd(p,2n) 141 Pm, 141 Pr( 3 He,3n) 141 Pm and 146 Nd(p,2n) 145 Pm. Nineteen new levels with spins up to (19/2) were observed in 141 Pm and twenty-two new levels with spins up to 15/2 in 145 Pm. In both nuclei, a group of positive-parity levels have been identified which can be interpreted as members of multiplets of d 5 / 2 and g 7 / 2 protons coupled to the quadrupole vibrations of the core. Transition probabilities of the decay modes of isomeric h 11 / 2 states have been determined. (author)

  17. Money-back guarantee warranty policy with preventive maintenance strategy for sensor-embedded remanufactured products

    Science.gov (United States)

    Alqahtani, Ammar Y.; Gupta, Surendra M.

    2018-01-01

    In today's global environment, technology is constantly evolving. Being able to stay up-to-date with the very latest technological advances can be extremely hard to accomplish. As a result of these changes and developments in technology, which often come unexpectedly, consumers are frequently tempted to update their devices to the very latest model. The result is that the life cycle of a product is becoming shorter and shorter than before. Manufacturers attempt to respond to consumers' concerns involving environmental issues as well as the more governmentally stringent environmental legislations by establishing facilities which include the minimization of the totality of waste relocated to landfills by recovering materials and components from returned, or End-Of-Life products and reuse them to build a remanufactured product, and/or novel components. With the rapid growth of interest in remanufactured products' market, offering warranty for remanufactured products and components is becoming a necessity for remanufacturer in order to meet customers' requirement and as a marketing mechanism. During that process, maintenance policies are of great importance in order to reduce the warranty cost on the remanufacturer. In this paper, an optimization simulation model for remanufactured items sold with one-dimensional non-renewing money-back guarantee (MBG) warranty policy is proposed from the view of remanufacturer, in which, an End-Of-Life product is subjected to upgrade action at the end of its past life and during the warranty period, preventive maintenance actions are carried out when the remaining life of the product reaches a pre-specified value so that the remanufacturer's expected profit can be maximized. Finally, a numerical example and design of experiment analysis are provided to demonstrate the proposed approach.

  18. Spare parts sharing with joint optimization of maintenance and inventory policies

    DEFF Research Database (Denmark)

    Larsen, Christian; Wong, Hartanto Wijaya; Nielsen, Lars Relund

    We consider a collaborative arrangement where a number of companies are willing to share expensive spare parts, required for both failure replacement and preventive maintenance purposes. We develop a discrete-time Markov decision model for the joint optimization of maintenance and spare parts...

  19. Operation and maintenance strategies for wave energy converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Marquis, Laurent; Kofoed, Jens Peter

    2015-01-01

    costs including costs due to lost electricity production are minimized. The risk-based approach is compared with an approach where only boats are used and another approach where the target is to minimize the downtime of the device. This article presents a dynamic approach for total operation......Inspection and maintenance costs are a significant contributor to the cost of energy for wave energy converters. There are different operation and maintenance strategies for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs....... Furthermore, a helicopter and boats can be used to transport equipment and personnel to the device, or the whole device can be towed to a harbour for operation and maintenance actions. This article describes, among others, a risk-based inspection and maintenance planning approach where the overall repair...

  20. Effectiveness of Relapse Prevention Cognitive-Behavioral Model in Opioid-Dependent Patients Participating in the Methadone Maintenance Treatment in Iran.

    Science.gov (United States)

    Pashaei, Tahereh; Shojaeizadeh, Davoud; Rahimi Foroushani, Abbas; Ghazitabatabae, Mahmoud; Moeeni, Maryam; Rajati, Fatemeh; M Razzaghi, Emran

    2013-08-01

    To evaluate the effectiveness of a relapse prevention cognitive-behavioral model, based on Marlatt treatment approach, in Opioid-dependent patients participating in the Methadone Maintenance Treatment (MMT) in Iran. The study consisted of 92 individuals treated with methadone in Iranian National Center of Addiction Studies (INCAS). Participants were randomized into two groups: educational intervention group (N=46) and control group (N=46). The intervention was comprised of 10 weekly 90 minute sessions, done during a period of 2.5 months based on the most high risk situations determined using Inventory Drug Taking Situation instrument. Relapse was defined as not showing up for MMT, drug use for at least 5 continuous days, and a positive urinary morphine test. While, only 36.4% of the intervention group relapsed into drug use, 63.6% of the control group relapsed. The result of the logistic regressions showed that the odd ratio of the variable of intervention program for the entire follow up period was 0.43 (P<0.01). Further, the odd ratio of this variable in one month, three months, and 195 days after the therapy were 0.48 (P<.03), 0.31 (P<.02), and 0.13 (P<.02) respectively that revealed that on average, the probability of relapse among individuals in the intervention group was lower than patients in control group. Relapse prevention model based on Marlatt treatment approach has an effective role in decreasing relapse rate. This model can be introduced as a complementary therapy in patients treated with methadone maintenance.

  1. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  2. The meteorological monitoring audit, preventative maintenance and quality assurance programs at a former nuclear weapons facility

    International Nuclear Information System (INIS)

    Maxwell, D.R.

    1995-01-01

    The purposes of the meteorological monitoring audit, preventative maintenance, and quality assurance programs at the Rocky Flats Environmental Technology Site (Site), are to (1) support Emergency Preparedness (EP) programs at the Site in assessing the transport, dispersion, and deposition of effluents actually or potentially released into the atmosphere by Site operations; and (2) provide information for onsite and offsite projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance activities, and remediation activities. The risk from the Site includes chemical and radioactive emissions historically related to nuclear weapons component production activities that are currently associated with storage of large quantities of radionuclides (plutonium) and radioactive waste forms. The meteorological monitoring program provides information for site-specific weather forecasting, which supports Site operations, employee safety, and Emergency Preparedness operations

  3. A third-generation dispersion and third-generation hydrogen bonding corrected PM6 method: PM6-D3H+

    Directory of Open Access Journals (Sweden)

    Jimmy C. Kromann

    2014-06-01

    Full Text Available We present new dispersion and hydrogen bond corrections to the PM6 method, PM6-D3H+, and its implementation in the GAMESS program. The method combines the DFT-D3 dispersion correction by Grimme et al. with a modified version of the H+ hydrogen bond correction by Korth. Overall, the interaction energy of PM6-D3H+ is very similar to PM6-DH2 and PM6-DH+, with RMSD and MAD values within 0.02 kcal/mol of one another. The main difference is that the geometry optimizations of 88 complexes result in 82, 6, 0, and 0 geometries with 0, 1, 2, and 3 or more imaginary frequencies using PM6-D3H+ implemented in GAMESS, while the corresponding numbers for PM6-DH+ implemented in MOPAC are 54, 17, 15, and 2. The PM6-D3H+ method as implemented in GAMESS offers an attractive alternative to PM6-DH+ in MOPAC in cases where the LBFGS optimizer must be used and a vibrational analysis is needed, e.g., when computing vibrational free energies. While the GAMESS implementation is up to 10 times slower for geometry optimizations of proteins in bulk solvent, compared to MOPAC, it is sufficiently fast to make geometry optimizations of small proteins practically feasible.

  4. Study of the $K^{\\pm} \\rightarrow \\pi^{\\pm} \\gamma \\gamma$ decay by the NA62 experiment

    CERN Document Server

    INSPIRE-00100355; Romano, A.; Ceccucci, A.; Danielsson, H.; Falaleev, V.; Gatignon, L.; Goy Lopez, S.; Hallgren, B.; Maier, A.; Peters, A.; Piccini, M.; Riedler, P.; Frabetti, P.L.; Gersabeck, E.; Kekelidze, V.; Madigozhin, D.; Misheva, M.; Molokanova, N.; Movchan, S.; Shkarovskiy, S.; Zinchenko, A.; Rubin, P.; Baldini, W.; Cotta Ramusino, A.; Dalpiaz, P.; Fiorini, M.; Gianoli, A.; Norton, A.; Petrucci, F.; Savrie, M.; Wahl, H.; Bizzeti, A.; Bucci, F.; Iacopini, E.; Lenti, M.; Veltri, M.; Antonelli, A.; Moulson, M.; Raggi, M.; Spadaro, T.; Eppard, K.; Hita-Hochgesand, M.; Kleinknecht, K.; Renk, B.; Wanke, R.; Winhart, A.; Winston, R.; Bolotov, V.; Duk, V.; Gushchin, E.; Ambrosino, F.; Di Filippo, D.; Massarotti, P.; Napolitano, M.; Palladino, V.; Saracino, G.; Anzivino, G.; Imbergamo, E.; Piandani, R.; Sergi, A.; Cenci, P.; Pepe, M.; Costantini, F.; Doble, N.; Giudici, S.; Pierazzini, G.; Sozzi, M.; Venditti, S.; Balev, S.; Collazuol, G.; Di, L.; Gallorini, S.; Goudzovski, E.; Lamanna, G.; Mannelli, I.; Ruggiero, G.; Cerri, C.; Fantechi, R.; Kholodenko, S.; Kurshetsov, V.; Obraztsov, V.; Semenov, V.; Yushchenko, O.; D'Agostini, G.; Leonardi, E.; Serra, M.; Valente, P.; Fucci, A.; Salamon, A.; Bloch-Devaux, B.; Peyaud, B.; Engelfried, J.; Coward, D.; Kozhuharov, V.; Litov, L.; Arcidiacono, R.; Bifani, S.; Biino, C.; Dellacasa, G.; Marchetto, F.; Numao, T.; Retiere, F.

    2014-05-01

    A study of the dynamics of the rare decay $K^\\pm\\to\\pi^\\pm\\gamma\\gamma$ has been performed on a sample of 232 decay candidates, with an estimated background of $17.4\\pm1.1$ events, collected by the NA62 experiment at CERN in 2007. The results are combined with those from a measurement conducted by the NA48/2 collaboration at CERN. The combined model-independent branching ratio in the kinematic range $z=(m_{\\gamma\\gamma}/m_K)^2>0.2$ is ${\\cal B}_{\\rm MI}(z>0.2) = (0.965 \\pm 0.063) \\times 10^{-6}$, and the combined branching ratio in the full kinematic range assuming a Chiral Perturbation Theory description is ${\\cal B}(K_{\\pi\\gamma\\gamma}) = (1.003 \\pm 0.056) \\times 10^{-6}$. A detailed comparison of the results with the previous measurements is performed.

  5. Growth, extracellular alkaline phosphatase activity, and kinetic characteristic responses of the bloom-forming toxic cyanobacterium, Microcystis aeruginosa, to atmospheric particulate matter (PM2.5, PM2.5-10, and PM>10).

    Science.gov (United States)

    Xu, Ziran; Wang, Shoubing; Wang, Yuanan; Zhang, Jie

    2018-03-01

    Atmospheric particulate matter (APM), commonly seen and widely excited in environment, appears great enough to influence the biochemical processes in aquatic microorganisms and phytoplankton. Understanding the response of cyanobacteria to various factors is fundamental for eutrophication control. To clarify the response of cyanobacteria to APM, the effects of PM 2.5 , PM 2.5-10 , and PM >10 on Microcystis aeruginosa were researched. Variabilities in cell density, chlorophyll a, soluble protein, malondialdehyde, extracellular activity, and kinetic parameters of alkaline phosphatase were evaluated by lab-cultured experiments. Results showed that the PM 2.5 had a slight stimulation impact on the growth and enhanced both of the 48- and 72-h extracellular alkaline phosphatase activity (APA), the affinity of alkaline phosphatase for substrate, and the 72-h maximum enzymatic reaction velocity (V max ). Moreover, the stimulations in extracellular APA and V max enhanced with the increasing exposure concentrations. We also found there were no obvious distinctions on the effects of growth and alkaline phosphatase in M. aeruginosa between PM 2.5-10 and PM >10 exposure groups. Obviously, inhibitory effects on growth existed in 4.0 and 8.0 mg/L PM 2.5-10 and 8.0 mg/L PM >10 at 120 h. Furthermore, PM 2.5-10 and PM >10 exerted inhibitory effects on the extracellular APA during the 72-h exposure. Simultaneously, the V max was notably inhibited and the affinity of alkaline phosphatase for substrate was more inseparable compared with control in PM 2.5-10 and PM >10 treatments. Nevertheless, the inhibitors in extracellular APA and kinetic parameters were unrelated to PM 2.5-10 and PM >10 exposure concentrations. Two-way ANOVA results revealed that there were significant interactions between exposure concentration and diameter of APM on the 120-h cell density, soluble protein content, APA, and 72 h APA of M. aeruginosa. These results in our study would be meaningful to further

  6. Relación entre las partículas finas (PM 2.5 y respirables PM 10 en la ciudad de Medellín Relation between fine particles (PM 2.5 and breathable particles (PM 10 in Medellin city

    Directory of Open Access Journals (Sweden)

    Carlos Alberto Echeverri Londoño

    2008-01-01

    Full Text Available En este trabajo se presenta parte de los resultados del proyecto 'Patologías respiratorias en niños preescolares y su relación con la contaminación atmosférica de Medellín', realizado por la Universidad de Medellín y la Universidad CES para la Secretaria de Salud de Medellín dentro del contrato 4700026668 de 2006. Se realizaron mediciones simultáneas de partículas finas (PM2.5 y respirables (PM10 durante el período de febrero a octubre de 2007 en varios sitios de la ciudad de Medellín, capital del departamento de Antioquia, habitada aproximadamente por 2’250.000 personas. Los resultados del análisis muestran, en la mayoría de los casos, una correlación positiva y lineal entre los dos parámetros. La relación (PM2.5/PM10 promedio para los sitios o zonas bajo consideración en este estudio fue de aproximadamente 0.67, valor bastante considerable que hace pensar que probablemente se puede cumplir con la norma anual para PM10, pero no para PM2.5. Los resultados obtenidos identifican las partículas finas como uno de los principales problemas de contaminación en la ciudad de Medellín.This article shows part of the results from the project called: 'Respiratory pathologies in pre-school children and their relation to atmospheric contamination in Medellin,' carried out by Universidad de Medellin and Universidad CES for Medellin Health Secretariat according to contract No. 4700026668, year 2006. Simultaneous measurements of fine particles (PM2.5 and breathable particles (PM10 were made from February to October, 2007 in several sites of Medellin, the capital city of Antioquia State, where about 2,250,000 inhabitants live. In almost all cases, analysis results show a positive and linear correlation between both parameters. Average ratio (PM2.5/PM10 for sites and zones tested in this study was 0.67 approximately, which is a very meaningful value, what makes us think that annual norm for PM10 can probably be accomplished, but not the one

  7. MiR-146a regulates PM1 -induced inflammation via NF-κB signaling pathway in BEAS-2B cells.

    Science.gov (United States)

    Liu, Limin; Wan, Chong; Zhang, Wei; Guan, Longfei; Tian, Guoxiong; Zhang, Fang; Ding, Wenjun

    2018-04-18

    Exposure to particulate matter (PM) leads to kinds of cardiopulmonary diseases, such as asthma, COPD, arrhythmias, lung cancer, etc., which are related to PM-induced inflammation. We have found that PM 2.5 (aerodynamics diameter <2.5 µm) exposure induces inflammatory response both in vivo and in vitro. Since the toxicity of PM is tightly associated with its size and components, PM 1 (aerodynamics diameter <1.0 µm) is supposed to be more toxic than PM 2.5 . However, the mechanism of PM 1 -induced inflammation is not clear. Recently, emerging evidences prove that microRNAs play a vital role in regulating inflammation. Therefore, we studied the regulation of miR-146a in PM 1 -induced inflammation in human lung bronchial epithelial BEAS-2B cells. The results show that PM 1 induces the increase of IL-6 and IL-8 in BEAS-2B cells and up-regulates the miR-146a expression by activating NF-κB signaling pathway. Overexpressed miR-146a prevents the nuclear translocation of p65 through inhibiting the IRAK1/TRAF6 expression, and downregulates the expression of IL-6 and IL-8. Taken together, these results demonstrate that miR-146a can negatively feedback regulate PM 1 -induced inflammation via NF-κB signaling pathway in BEAS-2B cells. © 2018 Wiley Periodicals, Inc.

  8. Composition and sources of particles in Mannerheimintie during exceedance days of PM{sub 10} limit value in 2010; Hiukkasten koostumus ja laehteet Mannerheimintiellae PM{sub 10}-raja-arvon ylityspaeivinae 2010

    Energy Technology Data Exchange (ETDEWEB)

    Kupiainen, K.; Niemi, J.; Ritola, R.; Stojiljkovic, A.

    2012-02-15

    The purpose of the work was to determine sources of respirable particles (PM{sub 10}) in the center of Helsinki, at the measurement station in Mannerheimintie traffic site, in 2010 during the days when the daily average concentration of PM{sub 10} exceeded 50 mug/m3. By the end of the year (2010) the number of this kind of days was 24. The allowed number of exceedance days per year is 35, so the limit value was not exceeded in 2010. Similar work has been carried out in 2008 and 2009 and this report also summarizes results from all three years. HSY is responsible for monitoring the air quality in the Helsinki metropolitan area. The PM{sub 10} monitoring data in combination with electron microscopy based single particle compositional analysis and receptor modeling was used to evaluate dust source contributions on the exceedance days at HSY's air quality monitoring station in Mannerheimintie. According to the study the most significant source of PM{sub 10} particles in Mannerheimintie in 2010 was the dust sources related to traction control (winter-sanding and -salting of streets, pavement wear by studded tyres). Results from 2008 and 2009 show similar tendency. Also dust from construction sites contribute to airborne particle concentrations, timing of this source varies depending on the year. In 2010 particles from construction sites contributed to the exceedances that took place in late spring and early summer. Long-range transboundary air pollution also caused high concentrations of particles and contributed to some of the exceedances in 2008-2010. In late July and early August in 2010, long-range transboundary particles from the forest fires in Russia caused high particle concentrations in Helsinki metropolitan area and elsewhere in Southern Finland. Based on the results, the most significant means to reduce the airborne concentrations and to prevent the exceedance of the limit value are those that aim at mitigating street dust. In Helsinki, the means to

  9. Costs of performance based maintenance for local roads: Case study Albania

    Science.gov (United States)

    Jokanović, Igor; Grujić, Bojana; Zeljić, Dragana; Grujić, Žarko; Svilar, Mila

    2017-12-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inadequate local roads maintenance in Albania is proposed to be solved by implementing performance based maintenance approach for which the costing exercise is presented within the paper.

  10. Failure mode and effect analysis in asset maintenance : a multiple case study in the process industry

    NARCIS (Netherlands)

    Braaksma, Jan; Klingenberg, W.; Veldman, J.

    2013-01-01

    Failure mode and effect analysis (FMEA) is an important method for designing and prioritising preventive maintenance activities and is often used as the basis for preventive maintenance planning. Although FMEA was studied extensively, most of the published work so far covers FMEA concept design.

  11. Failure mode and effect analysis in asset maintenance: a multiple case study in the process industry

    NARCIS (Netherlands)

    Braaksma, Anne Johannes Jan; Klingenberg, W.; Veldman, Jasper

    2013-01-01

    Failure mode and effect analysis (FMEA) is an important method for designing and prioritising preventive maintenance activities and is often used as the basis for preventive maintenance planning. Although FMEA was studied extensively, most of the published work so far covers FMEA concept design.

  12. Concepts for measuring maintenance performance and methods for analysing competing failure modes

    DEFF Research Database (Denmark)

    Cooke, R.; Paulsen, J.L.

    1997-01-01

    competing failure modes. This article examines ways to assess maintenance performance without introducing statistical assumptions, then introduces a plausible statistical model for describing the interaction of preventive and corrective maintenance, and finally illustrates these with examples from...

  13. Model for cost economic analysis in the maintenance of distribution networks

    International Nuclear Information System (INIS)

    Flores, N.; Leite, O.C.; Abe, R.Y.; Violante, R.A.

    1989-01-01

    A methodology for evaluating the costs from aerial distribution networks maintenance is described, aiming give a tool for the planning decisions, with the purpose to keeping the system operating in equilibrium conditions between the resources invested on the preventive and corrective maintenance. (C.G.C.)

  14. Variability of levels and composition of PM10 and PM2.5 in the Barcelona metro system

    Directory of Open Access Journals (Sweden)

    E. de Miguel

    2012-06-01

    Full Text Available From an environmental perspective, the underground metro system is one of the cleanest forms of public transportation in urban agglomerations. Current studies report contradicting results regarding air quality in the metro systems: whereas some reveal poor air quality, others report PM levels which are lower or of the same order of magnitude than those measured in traffic sites above ground level. The present work assesses summer and winter indoor air quality and passenger exposure in the Barcelona metro, focusing on PM levels and their metal contents. In addition, the impact on indoor air quality of platform screen door systems (automated systems consisting of closed rail track and platforms is evaluated, to determine whether these systems reduce passenger exposure to PM when compared with conventional systems (open tracks and platforms. In the Barcelona metro PM levels inside the trains in summer are amongst the lowest reported for worldwide metro systems (11–32 μg m−3 PM2.5. This is most likely due to the air conditioning system working in all carriages of the Barcelona metro during the whole year. Levels were considerably higher on the platforms, reaching mean levels of 46 and 125 μg m3 in the new (L9 and old (L3 lines, respectively. PM10 data are also reported in the present study, but comparison with other metro systems is difficult due to the scarcity of data compared with PM2.5. Results showed distinct PM daily cycles, with a drastic increase from 06:00 to 07:00 a.m., a diurnal maximum from 07:00 to 10:00 p.m., and marked decrease between 10:00 p.m. and 05:00 a.m. The elements with the highest enrichment were those associated with wheel or brake abrasion products (Ba, Fe, Cu, Mn, Cr, Sb, As, Mo, Co, Sr, among others. Laminar hematite (Fe2O3 was the dominant particle type, being mainly originated by mechanical abrasion of the rail track and wheels. Regarding passenger exposure to PM, the contribution of commuting by metro was

  15. Nuclear instrument maintenance - problems, solutions, and obstacles

    International Nuclear Information System (INIS)

    Vuister, P.H.

    1983-01-01

    In 200 laboratories of South-East Asia, Latin America and Africa a survey was made of the state of instrumentation for nuclear medicine. The principal cause of failures and defects was inadequate quality control and preventive maintenance. On the basis of the survey coordinated research programs were compiled for the maintenance of nuclear instruments. The four principal points of the programs are: to safeguard quality and stable electric power supplies for the instruments, to safeguard permanent temperature and humidity in the environment in which the equipment is operated, effective maintenance, and training of personnel. In the years 1981 and 1982, 14 local training courses were run in which emphasis was put on practicals and tests in mechanics and electronics

  16. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  17. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  18. Towards total productive maintenance in the Eastern European mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Buck, J.D. [Kepner-Tregoe (United Kingdom) Ltd., Windsor

    1999-08-01

    An European Union consultancy project was undertaken to install a `best-in-class` maintenance system for the lignite mines of Romania. The project, funded by PHARE, started with a critical analysis of the maintenance and repair systems of equipment in both the open-pit and underground mines operated by RALO (Regia Autonoma a Lignitului Octenia). This study paved the way for the introduction of a computerised maintenance system and the inception of a planned preventative maintenance scheme. A development strategy leading by a structural methodology towards predictive maintenance and total productive maintenance was drawn up and attention was given to multi-skilling, training and further facilitating activities to enable the success of the total productive maintenance strategy. An abridged version of the paper was presented at MAINTE 97, held in Birmingham, UK in 1997. 5 refs., 5 figs., 1 tab.

  19. Master--slave manipulators and remote maintenance at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Jenness, R.G.; Wicker, C.D.

    1975-01-01

    The volume of master-slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and the organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and the development of precise procedures for accomplishing the maintenance of 283 installed units. To provide the most economical type of preventive maintenance, a very satisfactory computer-programmed maintenance system has been established at the Laboratory. (auth)

  20. The maintenance of nuclear medicine equipments: the stakes in the liberal sector

    International Nuclear Information System (INIS)

    Fauchet, M.; Chambon, T.; Tellier, P.

    1994-01-01

    Maintenance of nuclear medicine installations is an obligation in the private sector (preventive maintenance to be sure of the detectors quality and of the associated software and hardware, corrective maintenance to be sure of the results quality and of the installations profitability). They must be negotiated at the time of the installations choice and added to the total cost of the equipment. Gamma cameras are chosen for illustrating these maintenance problems. (A.B.). 5 refs., 7 figs