  1. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  2. Periodic imperfect preventive maintenance with two categories of competing failure modes

    Energy Technology Data Exchange (ETDEWEB)

    Zequeira, R.I. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: romulo.zequeira@utt.fr; Berenguer, C. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: christophe.berenguer@utt.fr

    2006-04-15

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists.

  3. Periodic imperfect preventive maintenance with two categories of competing failure modes

    International Nuclear Information System (INIS)

    Zequeira, R.I.; Berenguer, C.

    2006-01-01

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists

  4. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    Directory of Open Access Journals (Sweden)

    Paolo Renna

    2017-03-01

    Full Text Available Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performance measures are compared with a system without any flexibility and no preventive maintenance actions. Different levels of flexibility and preventive maintenance actions are examined under a simulation environment. The simulation results highlight more important factors for the performance measures and the best combination of the factors to improve the performance.

  5. Disaster: Prevention, Preparedness and Action.

    Science.gov (United States)

    Buchanan, Sally

    1981-01-01

    Discission of threat of disaster to library archival materials focuses on prevention (building maintenance, materials storage, fire prevention), preparedness (preplanning, procedures for handling emergencies, finances of recovery operation), and action (instructions for handling damaged materials). Current library activities in disaster planning…

  6. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  7. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  8. Optimal interval for major maintenance actions in electricity distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    Louit, Darko; Pascual, Rodrigo [Centro de Mineria, Pontificia Universidad Catolica de Chile, Av. Vicuna MacKenna, 4860 Santiago (Chile); Banjevic, Dragan [Centre for Maintenance Optimization and Reliability Engineering, University of Toronto, 5 King' s College Rd., Toronto, Ontario (Canada)

    2009-09-15

    Many systems require the periodic undertaking of major (preventive) maintenance actions (MMAs) such as overhauls in mechanical equipment, reconditioning of train lines, resurfacing of roads, etc. In the long term, these actions contribute to achieving a lower rate of occurrence of failures, though in many cases they increase the intensity of the failure process shortly after performed, resulting in a non-monotonic trend for failure intensity. Also, in the special case of distributed assets such as communications and energy networks, pipelines, etc., it is likely that the maintenance action takes place sequentially over an extended period of time, implying that different sections of the network underwent the MMAs at different periods. This forces the development of a model based on a relative time scale (i.e. time since last major maintenance event) and the combination of data from different sections of a grid, under a normalization scheme. Additionally, extended maintenance times and sequential execution of the MMAs make it difficult to identify failures occurring before and after the preventive maintenance action. This results in the loss of important information for the characterization of the failure process. A simple model is introduced to determine the optimal MMA interval considering such restrictions. Furthermore, a case study illustrates the optimal tree trimming interval around an electricity distribution network. (author)

  9. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  10. Optimization of the preventive maintenance plan of a series components system

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Jose A. Caldeira [Mathematical Department, Instituto Politecnico de Setubal/Escola Superior de Tecnologia de Setubal, Campus do IPS, Estefanilha, 2914-508 Setubal (Portugal)]. E-mail: jduarte@est.ips.pt; Craveiro, Joao C. Taborda A. [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal); Trigo, Tomas Pedro [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal)

    2006-04-15

    One of the most critical problems in preventive maintenance is the determination of the optimum frequency to perform preventive maintenance in equipment, in order to ensure its availability. In this paper, we propose an algorithm to solve the previous problem for equipment that exhibit linearly increasing hazard rate and constant repair rate. Based on this algorithm, we have developed another one to solve the problem of maintenance management of a series system based on preventive maintenance over the different system components. We assume that all components of the system still exhibit linearly increasing hazard rate and constant repair rate and that preventive maintenance would bring the system to the as good as new condition. We define a cost function for maintenance tasks (preventive and corrective) for the system. The algorithm calculates the interval of time between preventive maintenance actions for each component, minimizing the costs, and in such a way that the total downtime, in a certain period of time, does not exceed a predetermined value.

  11. Optimizing preventive maintenance policy: A data-driven application for a light rail braking system.

    Science.gov (United States)

    Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel

    2017-10-01

    This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions.

  12. RCM optimization of a system under both preventive and corrective maintenance

    International Nuclear Information System (INIS)

    Bris, R.; Cepin, M.

    2005-01-01

    Testing and maintenance activities of power electrical equipment are an important potential for both risk and cost reduction. A multi-objective maintenance optimization method is presented based on the Genetic Algorithms (GA) technique. The method determines the optimal schedule of preventive maintenance actions based on minimization both selected risk measure and cost. Applied cost model takes into account both preventive and corrective maintenance. This paper also presents application of the methodology to optimize maintenance of a real distribution network 22 kV. Conclusions and recommendations for practice are made on the basis of obtained results. (author)

  13. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    OpenAIRE

    Paolo Renna

    2017-01-01

    Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performa...

  14. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  15. Preventive maintenance prioritization index of medical equipment using quality function deployment.

    Science.gov (United States)

    Saleh, Neven; Sharawi, Amr A; Elwahed, Manal Abd; Petti, Alberto; Puppato, Daniele; Balestra, Gabriella

    2015-05-01

    Preventive maintenance is a core function of clinical engineering, and it is essential to guarantee the correct functioning of the equipment. The management and control of maintenance activities are equally important to perform maintenance. As the variety of medical equipment increases, accordingly the size of maintenance activities increases, the need for better management and control become essential. This paper aims to develop a new model for preventive maintenance priority of medical equipment using quality function deployment as a new concept in maintenance of medical equipment. We developed a three-domain framework model consisting of requirement, function, and concept. The requirement domain is the house of quality matrix. The second domain is the design matrix. Finally, the concept domain generates a prioritization index for preventive maintenance considering the weights of critical criteria. According to the final scores of those criteria, the prioritization action of medical equipment is carried out. Our model proposes five levels of priority for preventive maintenance. The model was tested on 200 pieces of medical equipment belonging to 17 different departments of two hospitals in Piedmont province, Italy. The dataset includes 70 different types of equipment. The results show a high correlation between risk-based criteria and the prioritization list.

  16. PREVENTIVE MAINTENANCE. HONEYWELL PLANNING GUIDE.

    Science.gov (United States)

    Honeywell, Inc., Minneapolis, Minn.

    THIS HONEYWELL PAMPHLET DISCUSSES SOME ASPECTS OF PREVENTIVE MAINTENANCE OF AUTOMATIC CONTROLS, HEATING, VENTILATING, AND AIR CONDITIONING, AND COMPARES IN-PLANT WITH CONTRACT SERVICE, CONCLUDING THAT CONTRACT SERVICE IS PREFERABLE AND DESCRIBING A NUMBER OF MAINTENANCE PLANS WHICH THEY FURNISH. PREVENTIVE MAINTENANCE PROVIDES--(1) MORE EFFICIENT…

  17. Strategy and Management Guideline on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    An action-oriented and practical guideline for the planning, organisation and management of preventive school maintenance in Eritrea. The manual is the result of a participatory planning process which has involved actors at the school and community level, district levels and the national policy...

  18. Revised action plan of the Maintenance division for 1965, Annex 4

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-01-01

    The action plan presented in this annex is a revised version of the plan adopted in January 1965. It includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building [sr

  19. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  20. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  1. An optimal dynamic interval preventive maintenance scheduling for series systems

    International Nuclear Information System (INIS)

    Gao, Yicong; Feng, Yixiong; Zhang, Zixian; Tan, Jianrong

    2015-01-01

    This paper studies preventive maintenance (PM) with dynamic interval for a multi-component system. Instead of equal interval, the time of PM period in the proposed dynamic interval model is not a fixed constant, which varies from interval-down to interval-up. It is helpful to reduce the outage loss on frequent repair parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency, when compared to a periodic PM scheme. According to the definition of dynamic interval, the reliability of system is analyzed from the failure mechanisms of its components and the different effects of non-periodic PM actions on the reliability of the components. Following the proposed model of reliability, a novel framework for solving the non-periodical PM schedule with dynamic interval based on the multi-objective genetic algorithm is proposed. The framework denotes the strategies include updating strategy, deleting strategy, inserting strategy and moving strategy, which is set to correct the invalid population individuals of the algorithm. The values of the dynamic interval and the selections of PM action for the components on every PM stage are determined by achieving a certain level of system availability with the minimum total PM-related cost. Finally, a typical rotary table system of NC machine tool is used as an example to describe the proposed method. - Highlights: • A non-periodic preventive maintenance scheduling model is proposed. • A framework for solving the non-periodical PM schedule problem is developed. • The interval of non-periodic PM is flexible and schedule can be better adjusted. • Dynamic interval leads to more efficient solutions than fixed interval does

  2. Condition monitoring a key component in the preventive maintenance

    International Nuclear Information System (INIS)

    Isar, C.

    2006-01-01

    The preventive maintenance programs are necessary to ensure that nuclear safety significant equipment will function when it is supposed to. Diesel generator, pumps, motor operated valves and air operated control valves are typically operated every three months. When you drive a car, you depend on lot of sounds, the feel of the steering wheel and gauges to determine if the car is running correctly. Similarly with operating equipment for a power plant - sounds or vibration of the equipment or the gauges and test equipment indicate a problem or degradation, actions are taken to correct the deficiency. Due to safety and economical reason diagnostic and monitoring systems are of growing interest in all complex industrial production. Diagnostic systems are requested to detect, diagnose and localize faulty operating conditions at an early stage in order to prevent severe failures and to enable predictive and condition oriented maintenance. In this context it is a need for using various on-line and off-line condition monitoring and diagnostics, non-destructive inspection techniques and surveillance. The condition monitoring technique used in nuclear power plant Cernavoda are presented in this paper. The selection of components and parameters to be monitored, monitoring and diagnostics techniques used are incorporated into a preventive maintenance program. Modern measurement technique in combination with advanced computerized data processing and acquisition show new ways in the field of machine surveillance. The diagnostic capabilities of predictive maintenance technologies have increased recently year with advances made in sensor technologies. The paper will focus on the following condition monitoring technique: - oil analysis - acoustic leakage monitoring - thermography - valve diagnostics: motor operated valve, air operated valve and check valve - motor current signature - vibration monitoring and rotating machine monitoring and diagnostics For each condition monitoring

  3. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  4. Extended great deluge algorithm for the imperfect preventive maintenance optimization of multi-state systems

    International Nuclear Information System (INIS)

    Nahas, Nabil; Khatab, Abdelhakim; Ait-Kadi, Daoud; Nourelfath, Mustapha

    2008-01-01

    This paper deals with preventive maintenance optimization problem for multi-state systems (MSS). This problem was initially addressed and solved by Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203]. It consists on finding an optimal sequence of maintenance actions which minimizes maintenance cost while providing the desired system reliability level. This paper proposes an approach which improves the results obtained by genetic algorithm (GENITOR) in Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203]. The considered MSS have a range of performance levels and their reliability is defined to be the ability to meet a given demand. This reliability is evaluated by using the universal generating function technique. An optimization method based on the extended great deluge algorithm is proposed. This method has the advantage over other methods to be simple and requires less effort for its implementation. The developed algorithm is compared to than in Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203] by using a reference example and two newly generated examples. This comparison shows that the extended great deluge gives the best solutions (i.e. those with minimal costs) for 8 instances among 10

  5. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  6. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)

  7. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  8. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  9. Joint optimization of production scheduling and machine group preventive maintenance

    International Nuclear Information System (INIS)

    Xiao, Lei; Song, Sanling; Chen, Xiaohui; Coit, David W.

    2016-01-01

    Joint optimization models were developed combining group preventive maintenance of a series system and production scheduling. In this paper, we propose a joint optimization model to minimize the total cost including production cost, preventive maintenance cost, minimal repair cost for unexpected failures and tardiness cost. The total cost depends on both the production process and the machine maintenance plan associated with reliability. For the problems addressed in this research, any machine unavailability leads to system downtime. Therefore, it is important to optimize the preventive maintenance of machines because their performance impacts the collective production processing associated with all machines. Too lengthy preventive maintenance intervals may be associated with low scheduled machine maintenance cost, but may incur expensive costs for unplanned failure due to low machine reliability. Alternatively, too frequent preventive maintenance activities may achieve the desired high reliability machines, but unacceptably high scheduled maintenance cost. Additionally, product scheduling plans affect tardiness and maintenance cost. Two results are obtained when solving the problem; the optimal group preventive maintenance interval for machines, and the assignment of each job, including the corresponding start time and completion time. To solve this non-deterministic polynomial-time problem, random keys genetic algorithms are used, and a numerical example is solved to illustrate the proposed model. - Highlights: • Group preventive maintenance (PM) planning and production scheduling are jointed. • Maintenance interval and assignment of jobs are decided by minimizing total cost. • Relationships among system age, PM, job processing time are quantified. • Random keys genetic algorithms (GA) are used to solve the NP-hard problem. • Random keys GA and Particle Swarm Optimization (PSO) are compared.

  10. Comprehensive framework for preventive maintenance priority of medical equipment.

    Science.gov (United States)

    Saleh, Neven; Balestra, Gabriella

    2015-08-01

    Throughout the medical equipment life cycle, preventive maintenance is considered one of the most important stages that should be managed properly. However, the need for better management and control by giving a reasonable prioritization for preventive maintenance becomes essential. The purpose of this study is to develop a comprehensive framework for preventive maintenance priority of medical equipment using Quality Function Deployment (QFD) and Fuzzy Logic (FL). The quality function deployment is proposed in order to identify the most important criteria that could impact preventive maintenance priority decision; meanwhile the role of the fuzzy logic is to generate a priority index of the list of equipment considering those criteria. The model validation was carried out on 140 pieces of medical equipment belonging to two hospitals. In application, we propose to classify the priority index into five classes. The results indicate that the strong correlation existence between risk-based criteria and preventive maintenance priority decision.

  11. Application of preventive maintenance planning in a parquet ...

    African Journals Online (AJOL)

    STORAGESEVER

    2009-04-20

    Apr 20, 2009 ... Key words: Maintenance, preventive maintenance, enterprise, planning. INTRODUCTION .... There is machine introduction form on each machine. Moreover, ..... loy using total productive maintenance (TPM) approach. M.Sc.

  12. Proposing New Heuristic Approaches for Preventive Maintenance Scheduling

    Directory of Open Access Journals (Sweden)

    majid Esmailian

    2013-08-01

    Full Text Available The purpose of preventive maintenance management is to perform a series of tasks that prevent or minimize production breakdowns and improve reliability of production facilities. An important objective of preventive maintenance management is to minimize downtime of production facilities. In order to accomplish this objective, personnel should efficiently allocate resources and determine an effective maintenance schedule. Gopalakrishnan (1997 developed a mathematical model and four heuristic approaches to solve the preventive maintenance scheduling problem of assigning skilled personnel to work with tasks that require a set of corresponding skills. However, there are several limitations in the prior work in this area of research. The craft combination problem has not been solved because the craft combination is assumed as given. The craft combination problem concerns the computation of all combinations of assigning multi skilled workers to accomplishment of a particular task. In fact, determining craft combinations is difficult because of the exponential number of craft combinations that are possible. This research provides a heuristic approach for determining the craft combination and four new heuristic approach solution for the preventive maintenance scheduling problem with multi skilled workforce constraints. In order to examine the new heuristic approach and to compare the new heuristic approach with heuristic approach of Gopalakrishnan (1997, 81 standard problems have been generated based on the criterion suggested by from Gopalakrishnan (1997. The average solution quality (SQ of the new heuristic approaches is 1.86% and in old heuristic approaches is 8.32%. The solution time of new heuristic approaches are shorter than old heuristic approaches. The solution time of new heuristic approaches is 0.78 second and old heuristic approaches is 6.43 second, but the solution time of mathematical model provided by Gopalakrishnan (1997 is 152 second.

  13. Modularity Design Approach for Preventive Machine Maintenance

    Science.gov (United States)

    Ernawati, D.; Pudji, E.; Ngatilah, Y.; Handoyo, R.

    2018-01-01

    In a company, machine maintenance system will be very influential in production process activity. The company should have a scheduled engine maintenance system that does not require high costs when repairing and replacing machine parts. Modularity Design method is able to provide solutions to the engine maintenance scheduling system and can prevent fatal damage to the engine components. It can minimize the cost of repair and replacement of these machine components.The paper provides a solution to machine maintenance problems. The paper is also completed with case study of milling machines. That case studies can give us a real description about impact implementation of modularity design to prevent fatal damage to components and minimize the cost of repair and replacement of components of the machine.

  14. Joint optimization of preventive maintenance and spare parts inventory for an optimal production plan with consideration of CO_2 emission

    International Nuclear Information System (INIS)

    Ba, Kader; Dellagi, Sofiene; Rezg, Nidhal; Erray, Walid

    2016-01-01

    This article presents a joint optimization of spare parts inventory and preventive maintenance. While minimizing CO_2 emissions, this approach is based on an optimal production plan achieved thanks to the HMMS model. The process which is studied in this paper only manufactures one type of product. The purpose of the paper is to determine for a random demand over a given period, a cost-effective production plan and a maintenance policy which integrates a spare parts strategy in accordance with environmental requirements and regulations. Our green spare parts management can be defined as a set of actions that are applied in order to decrease the spare parts footprint in its lifetime (Ba et al., 2015) [1]. Indeed, we take into account the spare parts characteristics (new or used) which will be used during maintenance actions (preventive or corrective) to preserve the environment. Consequently, we set up analytical models based on the effect of the production rate on the system deterioration so as to substantially cut the maintenance costs, production costs and CO_2 emissions. To evaluate the performance of our models, we give some illustrative examples. - Highlights: • Establishment of an optimal production plan for a manufacturing process. • Cost-effective maintenance strategy with a green spare parts strategy. • Possibility to choose between used and new spare parts to execute maintenance action.

  15. Study on application of safety checklist in preventive maintenance activities

    International Nuclear Information System (INIS)

    Shi Jin; Chen Song; Liu Jingquan

    2013-01-01

    The paper describes the principles and the characteristics of safety checklist as a risk evaluation method. Examples of application of safety checklists to preventive maintenance activities such as criteria comparison and checkup items in place in nuclear power plants are illustrated in details with issues appeared in the checklist establishment. Checklist has a good application in the RCM analysis or in the actual preventive maintenance program for Chashma Nuclear Power Plant indicated by concrete instances. In the light of safety checklist which is used to sustain preventive maintenance as a simple and applicable risk analysis approach, we can get deep knowledge of risks of nuclear power plant to perfect preventive maintenance activities. (authors)

  16. Imperfect Preventive Maintenance Model Study Based On Reliability Limitation

    Directory of Open Access Journals (Sweden)

    Zhou Qian

    2016-01-01

    Full Text Available Effective maintenance is crucial for equipment performance in industry. Imperfect maintenance conform to actual failure process. Taking the dynamic preventive maintenance cost into account, the preventive maintenance model was constructed by using age reduction factor. The model regards the minimization of repair cost rate as final target. It use allowed smallest reliability as the replacement condition. Equipment life was assumed to follow two parameters Weibull distribution since it was one of the most commonly adopted distributions to fit cumulative failure problems. Eventually the example verifies the rationality and benefits of the model.

  17. Performance deterioration modeling and optimal preventive maintenance strategy under scheduled servicing subject to mission time

    Directory of Open Access Journals (Sweden)

    Li Dawei

    2014-08-01

    Full Text Available Servicing is applied periodically in practice with the aim of restoring the system state and prolonging the lifetime. It is generally seen as an imperfect maintenance action which has a chief influence on the maintenance strategy. In order to model the maintenance effect of servicing, this study analyzes the deterioration characteristics of system under scheduled servicing. And then the deterioration model is established from the failure mechanism by compound Poisson process. On the basis of the system damage value and failure mechanism, the failure rate refresh factor is proposed to describe the maintenance effect of servicing. A maintenance strategy is developed which combines the benefits of scheduled servicing and preventive maintenance. Then the optimization model is given to determine the optimal servicing period and preventive maintenance time, with an objective to minimize the system expected life-cycle cost per unit time and a constraint on system survival probability for the duration of mission time. Subject to mission time, it can control the ability of accomplishing the mission at any time so as to ensure the high dependability. An example of water pump rotor relating to scheduled servicing is introduced to illustrate the failure rate refresh factor and the proposed maintenance strategy. Compared with traditional methods, the numerical results show that the failure rate refresh factor can describe the maintenance effect of servicing more intuitively and objectively. It also demonstrates that this maintenance strategy can prolong the lifetime, reduce the total lifetime maintenance cost and guarantee the dependability of system.

  18. Preventive Maintenance. FMO: Fundamentals of Machine Operation. Third Edition.

    Science.gov (United States)

    Hathaway, Louis

    This text is intended to provide students with basic information on conducting preventive maintenance on agricultural machinery. The following topics are covered in the individual chapters: the importance of preventive maintenance and recommended service intervals; engine intake and exhaust systems (air cleaners, turbochargers, intake and exhaust…

  19. Integrated preventive maintenance and production decisions for imperfect processes

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Nahas, Nabil; Ben-Daya, Mohamed

    2016-01-01

    This paper integrates production, maintenance, and quality for an imperfect process in a multi-period multi-product capacitated lot-sizing context. The production system is modeled as an imperfect machine, whose the status is considered to be either in-control or out-of-control. When the machine is out of control, it produces a fraction of nonconforming items. During each period, this machine is inspected and imperfect preventive maintenance activities are simultaneously performed to reduce its age, proportional to the preventive maintenance level. The objective is to minimize the total cost, while satisfying the demand for all products. Our optimization model allows for a joint selection of the optimal values of production plan, and the maintenance policy, while taking into account quality related costs. A solution algorithm is developed and illustrative numerical examples are presented. It is found that the increase in PM level leads to reductions in quality control costs. Furthermore, if the cost of performing PM is high to the point where it is not compensated for by reductions in the quality related costs, then performing PM is not justifiable. Finally, using non-periodic preventive maintenance with the possibility of different preventive maintenance levels may result in an improvement of the total cost. - Highlights: • We integrate production, maintenance, and quality. • We evaluate all the expected costs. • Our model allows for a joint selection of the optimal values. • A solution algorithm is developed. • Increasing PM level will decrease quality control costs.

  20. A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems

    Science.gov (United States)

    Moghaddam, Kamran S.; Usher, John S.

    2011-07-01

    In this article, a new multi-objective optimization model is developed to determine the optimal preventive maintenance and replacement schedules in a repairable and maintainable multi-component system. In this model, the planning horizon is divided into discrete and equally-sized periods in which three possible actions must be planned for each component, namely maintenance, replacement, or do nothing. The objective is to determine a plan of actions for each component in the system while minimizing the total cost and maximizing overall system reliability simultaneously over the planning horizon. Because of the complexity, combinatorial and highly nonlinear structure of the mathematical model, two metaheuristic solution methods, generational genetic algorithm, and a simulated annealing are applied to tackle the problem. The Pareto optimal solutions that provide good tradeoffs between the total cost and the overall reliability of the system can be obtained by the solution approach. Such a modeling approach should be useful for maintenance planners and engineers tasked with the problem of developing recommended maintenance plans for complex systems of components.

  1. MINIMASI BIAYA PERAWATAN DENGAN MENGGUNAKAN METODE PREVENTIVE MAINTENANCE POLICY

    Directory of Open Access Journals (Sweden)

    Much Djunaidi

    2012-12-01

    Full Text Available PT. Primatexco Indonesia merupakan perusahaan tekstil dengan produk benang tenun, kain, printing, dan waste. Di PT. Primatexco Indonesia terdapat bagian blowing yang bertugas menyuplai bahan baku untuk proses produksi. Artikel ini membahas mengenai alternatif jadwal perbaikan maupun perawatan dengan biaya terkecil untuk komponen mesin blowing. Dengan menghitung biaya perawatan untuk repair policy dan dibandingkan dengan biaya preventive maintenance policy, maka akan didapatkan jadwal perbaikan maupun perawatan yang optimal. Dari hasil perhitungan, diusulkan jadwal perawatan mengikuti kebijakan repair untuk kerusakan komponen klasifikasi A. Untuk kerusakan komponen klasifikasi B diterapkan kebijakan preventive maintenance setiap 5 bulan. Dan untuk kerusakan komponen klasifikasi C diterapkan kebijakan preventive maintenance setiap 7 bulan.

  2. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  3. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  4. Preventive maintenance basis: Volume 31 -- Relays -- timing. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to timing relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  5. Preventive maintenance basis: Volume 30 -- Relays -- control. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to control relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  6. Preventive maintenance technology for nuclear power stations

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo

    1992-01-01

    With the increase of the number of nuclear power plants in operation and the number of years of operation, the improvement of reliability and the continuation of safe operation have become more important, and the expectation for preventive maintenance technology has also heightened. The maintenance of Japanese nuclear power plants is based on the time schedule maintenance mainly by the regular inspection carried out every year, but the monitoring of the conditions of various machinery and equipment in operation has been performed widely. In this report, the present state of checkup and inspection technologies and the monitoring and diagnostic technologies for operational condition, which are the key technologies of preventive maintenance, are described. As the checkup and inspection technologies, ultrasonic flow detection technology, phased array technology, Amplituden und Laufzeit Orts Kurven method and X-ray CT, and as the monitoring and diagnostic technologies for operational condition, the diagnosis support system for BWR plants 'PLADIS', those for rotary machines, those for turbogenerators, those for solenoid valves, the mechanization of patrol works and the systematizing technology are reported. (K.I.)

  7. Complete guide to preventive and predictive maintenance

    CERN Document Server

    Levitt, Joel

    2011-01-01

    This book shares the best practices, mistakes, victories, and essential steps for success which the author has gleaned from working with countless organizations. Unlike other books that only focus on the engineering issues (task lists) or management issues (CMMS), this in-depth resource is the first to give true emphasize to the four aspects of success in preventive maintenance systems - engineering, management, economic, and psychological - thereby enabling readers to have a balanced view and understanding of what is happening in their organizations. Additionally, it blends concrete actionable steps and structures with the theory behind the steps. It includes check sheets, history of PM, stories, photographs, and case histories. It contains a glossary of terms. It provides sample task lists for a variety of equipment with some of the logic behind each task. It offers templates for developing your own tasking. It includes protocols for detailed economic analysis with examples.

  8. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  9. Maintenance Policy in Public-Transport Involving Government Subsidy

    Science.gov (United States)

    Pasaribu, U. S.; Bayuzetra, Y.; Gunawan, L. E.; Husniah, H.

    2018-02-01

    A public transport with government subsidy is considered to encourage the sustainability of the transportation. The transportations revenue is determined by the maximum of the uptimes of the vehicle. In this paper, we study a one-dimensional maintenance policy for new vehicle which is characterized by age parameter. We consider that the degradation of the vehicle is affected by the age of the vehicle, and modelled by using a one-dimensional approach. The owner performs both preventive and corrective maintenance actions, and the preventive maintenance action will reduce the vehicle failure rate and hence it will decrease the corrective maintenance cost during the life time of the vehicle. The decision problem for the owner is to find the optimal preventive maintenance time of the vehicle of each subsidy option offered by maximizing the expected profit for each subsidy.

  10. Cost effectiveness of the MDOT preventive maintenance program.

    Science.gov (United States)

    2013-04-01

    The Michigan Department of Transportations (MDOT) pavement preservation program dates back to 1992. MDOTs pavement preservation strategy is primarily implemented through its capital preventive maintenance (CPM) program, in which preventive main...

  11. Preventive maintenance optimization for a multi-component system under changing job shop schedule

    International Nuclear Information System (INIS)

    Zhou Xiaojun; Lu Zhiqiang; Xi Lifeng

    2012-01-01

    Variability and small lot size is a common feature for many discrete manufacturing processes designed to meet a wide array of customer needs. Because of this, job shop schedule often has to be continuously updated in reaction to changes in production plan. Generally, the aim of preventive maintenance is to ensure production effectiveness and therefore the preventive maintenance models must have the ability to be adaptive to changes in job shop schedule. In this paper, a dynamic opportunistic preventive maintenance model is developed for a multi-component system with considering changes in job shop schedule. Whenever a job is completed, preventive maintenance opportunities arise for all the components in the system. An optimal maintenance practice is dynamically determined by maximizing the short-term cumulative opportunistic maintenance cost savings for the system. The numerical example shows that the scheme obtained by the proposed model can effectively address the preventive maintenance scheduling problem caused by the changes in job shop schedule and is more efficient than the ones based on two other commonly used preventive maintenance models.

  12. Application of preventive maintenance planning in a parquet ...

    African Journals Online (AJOL)

    In this study, the process of a parquet enterprise's transition to preventive maintenance which has been implementing maintenance technique in case of breakdown was investigated. During that transition process, follow up forms for maintenance–repair, breakdown and spare parts were prepared and the implementation ...

  13. Preventive maintenance-A countermeasure to plant aging

    International Nuclear Information System (INIS)

    Hlubek, W.

    1985-01-01

    The aging of power plants is caused by manifold and different influences. For instance, mechanical and thermal stress, radiation exposure, denting or wastage can considerably affect the aging of plant components and thus cause premature failures of components. In this presentation, the term 'Plant Aging' in nuclear power plants is to be understood more comprehensively than wear on components and material fatigue. In addition, nuclear power plants are to be adjusted to the advancing state of the science and technology (state-of-the-art) in order to guarantee safe operation at all times. The preventive maintenance - as a countermeasure to plant aging - comprises the systematic checks and servicing of the plant systems in operation and follows aging by inspection and tests. Experience with Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) preventive maintenance program at the Biblis NNP (1300 MW, PWR) is discussed. The concept of an 'Integrated Maintenance System' as a means to avoid 'Plant Aging' is presented

  14. Basic Characteristics of Human Erroneous Actions during Test and Maintenance Activities Leading to Unplanned Reactor Trips

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Park, Jin Kyun

    2010-01-01

    Test and maintenance (T and M) activities of nuclear power plants are essential for sustaining the safety of a power plant and maintaining the reliability of plant systems and components. However, the potential of human errors during T and M activities has also the potential to induce unplanned reactor trips or power derate or making safety-related systems unavailable. According to the major incident/accident reports of nuclear power plants in Korea, contribution of human errors takes up about 20% of the total events. The previous study presents that most of human-related unplanned reactor trip events during normal power operation are associated with T and M activities (63%), which are comprised of plant maintenance activities such as a 'periodic preventive maintenance (PPM)', a 'planned maintenance (PM)' and a 'corrective maintenance (CM)'. This means that T and M activities should be a major subject for reducing the frequency of human-related unplanned reactor trips. This paper aims to introduce basic characteristics of human erroneous actions involved in the test and maintenance-induced unplanned reactor trip events that have occurred between 1986 and 2006 in Korean nuclear power plants. The basic characteristics are described by dividing human erroneous actions into planning-based errors and execution-based errors. For the events associated with planning failures, they are, firstly, classified according to existence of the work procedure and then described for what aspects of the procedure or work plan have deficiency or problem. On the other hand, for the events associated with execution failures, they are described from the aspect of external error modes

  15. Principal scheme of preventive maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Nishiyama, Takuya; Terano, Takao; Yokoo, Takeshi; Shinohara, Yasushi

    1985-01-01

    It is of great importance to turn lessons learned from abnormal event experiences to advantage as well as taking apriori actions for prevention of abnormal events in nuclear power plants. From this point of view, a consultation system, named as Preventive Maintenance Support System (PMSS), which is to possess accumulated knowledges drawn from the past abnormal events in nuclear power plants infer occurrences, factors and developments of abnormal events and recommend preventive countermeasures on the basis of the knowledges, has been proposed. This report presents the principal scheme of PMSS. To begin with, following to the discussion of the purpose and use of PMSS, the fundamental functions PMSS should perform are specified. They are (1) event factors analyzation, (2) event prediction (event development estimation and analogous event estimation), (3) event significance evaluation and (4) preventive countermeasures presentation. In the next place, it is asserted that such a system should be constructed as a knowledge engineering one. Then, the R and D subjects and related schedule for PMSS are set up. (author)

  16. An integrated production, inventory and preventive maintenance model for a multi-product production system

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Wenbin; Peng, Rui

    2015-01-01

    This paper considers a production system that can produce multiple products alternately. Products go through the system in a sequence and a complete run of all products forms a production cycle. An integrated production, inventory and preventive maintenance model is constructed, which is characterized by the delay-time concept. Two different situations are studied based on whether the unqualified products and downtime caused by the failures of the system, set-up and preventive maintenance can be ignored or not. Three cases are considered for each situation, depending on the position of the preventive maintenance epochs: the first case, where preventive maintenance is carried out at the end of each production cycle; the second case, where preventive maintenance is carried out at each set-up time of the products; and the third case, where preventive maintenance is carried out at some set-up times only, since it may not always be optimal to carry out preventive maintenance at the end of the production cycle or at each set-up time. The modeling objectives are to find the optimal number of production cycles per year and the optimal position of preventive maintenance that will maximize the expected profit per unit time. Numerical examples, using real data, are presented to illustrate the model. - Highlights: • We propose an integrated economic production quantity and preventive maintenance model. • The situation that multiple products are produced on the same system alternately is studied. • Two situations are studied based on whether the downtime and the product quality can be ignored or not. • We use enumeration method and analytical method to select the optimal preventive maintenance policy, respectively. • We use the delay-time concept to model the preventive maintenance policy

  17. Preventive and corrective maintenance for MINT EPS 3000 electron beam machine

    International Nuclear Information System (INIS)

    Siti Aiasah Hashim; Shaari Jahar

    2005-01-01

    Preventive and corrective maintenance of a high energy electron is to ensure that the machine would not fail during operation. MINT's EPS 3000 electron beam machine has been in operation for almost 12 years. Throughout those years, events relating to scheduled overhauls and unscheduled corrective maintenance had provided invaluable experience in the form of informal maintenance training to the operators. With the implementation of ISO 9001:2000 Quality Management System at the facility, the preventive and corrective maintenance program is becoming more structured and orderly. Collected maintenance data shall be used to initiate continual improvement activities in the facility.This paper describes MINT-ALURTRON's 12 years experience in providing maintenance work for the EPS 3000. (Author)

  18. Optimal preventive maintenance and repair policies for multi-state systems

    International Nuclear Information System (INIS)

    Sheu, Shey-Huei; Chang, Chin-Chih; Chen, Yen-Luan; George Zhang, Zhe

    2015-01-01

    This paper studies the optimal preventive maintenance (PM) policies for multi-state systems. The scheduled PMs can be either imperfect or perfect type. The improved effective age is utilized to model the effect of an imperfect PM. The system is considered as in a failure state (unacceptable state) once its performance level falls below a given customer demand level. If the system fails before a scheduled PM, it is repaired and becomes operational again. We consider three types of major, minimal, and imperfect repair actions, respectively. The deterioration of the system is assumed to follow a non-homogeneous continuous time Markov process (NHCTMP) with finite state space. A recursive approach is proposed to efficiently compute the time-dependent distribution of the multi-state system. For each repair type, we find the optimal PM schedule that minimizes the average cost rate. The main implication of our results is that in determining the optimal scheduled PM, choosing the right repair type will significantly improve the efficiency of the system maintenance. Thus PM and repair decisions must be made jointly to achieve the best performance

  19. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  20. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  1. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K. [VTT Industrial Systems, Espoo (Finland)

    2006-12-15

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  2. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Laakso, K.

    2006-12-01

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  3. RCM [reliability-centered maintenance] at Ginna: Preventive maintenance program optimization at year 20

    International Nuclear Information System (INIS)

    Edgar, E.C.

    1989-01-01

    The reliability-centered maintenance (RCM) program at Rochester Gas ampersand Electric Company's Ginna station is entering its second year. Of the 20 systems originally selected for evaluation, 10 are in various stages of completion, and recommendations resulting from the earliest systems studied are now being implemented. As expected, few major discoveries have been made in terms of preventive maintenance program failings or excesses. The performance of the now 20-yr-old plant has been excellent in recent years, and objectives focus more on ensuring continued high standards of safety, reliability, and economy than on maintenance program cost reduction

  4. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  5. Preventive maintenance basis: Volume 19 -- HVAC -- chillers and compressors. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to HVAC -- Chillers and Compressors. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  6. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    OpenAIRE

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older tec...

  7. Preventive maintenance basis: Volume 37 -- Main turbine EHC hydraulics. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-11-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to the main turbine EHC hydraulic fluid and associated components. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  8. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  9. Repair and preventive maintenance technology for BWR reactor internals and piping

    International Nuclear Information System (INIS)

    Ootsubo, Tooru; Itou, Takashi; Sakashita, Akihiro

    2009-01-01

    Stress corrosion cracking of welding portion has found in many domestic and foreign BWR reactor internals and Primary Loop Recirculation piping. Also, repair and preventive maintenance technologies for SCC has been developed and/or adopted to BWRs in recent years. This paper introduces the sample of these technologies, such as seal-welding for SCC on BWR reactor internals, preventive maintenance technology for PLR piping such as Corrosion Resistant Cladding, Internal Polishing and Induction Heating Stress Improvement. These technologies are introduced on 'E-Journal of Advanced Maintenance', which is an international journal on a exclusive website of Japan Society of Maintenology. (author)

  10. Preventive Maintenance Optimization in Healthcare Domain: Status of Research and Perspective

    OpenAIRE

    Mahfoud, H.; El Barkany, A.; El Biyaali, A.

    2016-01-01

    Although medical equipment maintenance has been carefully managed for years, very few in-depth studies have been conducted to evaluate the effectiveness and efficiency of these implemented preventive maintenance strategies, especially after the debate about the credibility of manufacturer’s recommendations has increased in the clinical engineering community. Facing the dilemma of merely following manufactures maintenance manual or establishing an evidence-based maintenance, medical equipment ...

  11. Using risk-informed asset management for feedwater system preventative maintenance optimization

    International Nuclear Information System (INIS)

    Kee, Ernest; Sun, Alice; Richards, Andrew; Grantom, Rick; Liming, James; Salter, James

    2004-01-01

    The initial development of a South Texas Project Nuclear Operating Company process for supporting preventative maintenance optimization by applying the Balance-Of-Plant model and Risk-Informed Asset Management alpha-level software applications is presented. Preventative maintenance activities are evaluated in the South Texas Project Risk-Informed Asset Management software while the plant maintains or improves upon high levels of nuclear safety. In the Balance-Of-Plant availability application, the level of detail in the feedwater system is enhanced to support plant decision-making at the component failure mode and human error mode level of indenture by elaborating on the current model at the super-component level of indenture. The enhanced model and modeling techniques are presented. Results of case studies in feedwater system preventative maintenance optimization sing plant-specific data are also presented. (author)

  12. Joint redundancy and imperfect preventive maintenance optimization for series–parallel multi-state degraded systems

    International Nuclear Information System (INIS)

    Nourelfath, Mustapha; Châtelet, Eric; Nahas, Nabil

    2012-01-01

    This paper formulates a joint redundancy and imperfect preventive maintenance planning optimization model for series–parallel multi-state degraded systems. Non identical multi-state components can be used in parallel to improve the system availability by providing redundancy in subsystems. Multiple component choices are available in the market for each subsystem. The status of each component is considered to degrade with use. The objective is to determine jointly the maximal-availability series–parallel system structure and the appropriate preventive maintenance actions, subject to a budget constraint. System availability is defined as the ability to satisfy consumer demand that is represented as a piecewise cumulative load curve. A procedure is used, based on Markov processes and universal moment generating function, to evaluate the multi-state system availability and the cost function. A heuristic approach is also proposed to solve the formulated problem. This heuristic is based on a combination of space partitioning, genetic algorithms (GA) and tabu search (TS). After dividing the search space into a set of disjoint subsets, this approach uses GA to select the subspaces, and applies TS to each selected sub-space.

  13. Design of preventive maintenance system using the reliability engineering and maintenance value stream mapping methods in PT. XYZ

    Science.gov (United States)

    Sembiring, N.; Panjaitan, N.; Angelita, S.

    2018-02-01

    PT. XYZ is a company owned by non-governmental organizations engaged in the field of production of rubber processing becoming crumb rubber. Part of the production is supported by some of machines and interacting equipment to achieve optimal productivity. Types of the machine that are used in the production process are Conveyor Breaker, Breaker, Rolling Pin, Hammer Mill, Mill Roll, Conveyor, Shredder Crumb, and Dryer. Maintenance system in PT. XYZ is corrective maintenance i.e. repairing or replacing the engine components after the crash on the machine. Replacement of engine components on corrective maintenance causes the machine to stop operating during the production process is in progress. The result is in the loss of production time due to the operator must replace the damaged engine components. The loss of production time can impact on the production targets which were not reached and lead to high loss costs. The cost for all components is Rp. 4.088.514.505. This cost is really high just for maintaining a Mill Roll Machine. Therefore PT. XYZ is needed to do preventive maintenance i.e. scheduling engine components and improving maintenance efficiency. The used methods are Reliability Engineering and Maintenance Value Stream Mapping (MVSM). The needed data in this research are the interval of time damage to engine components, opportunity cost, labor cost, component cost, corrective repair time, preventive repair time, Mean Time To Opportunity (MTTO), Mean Time To Repair (MTTR), and Mean Time To Yield (MTTY). In this research, the critical components of Mill Roll machine are Spier, Bushing, Bearing, Coupling and Roll. Determination of damage distribution, reliability, MTTF, cost of failure, cost of preventive, current state map, and future state map are done so that the replacement time for each critical component with the lowest maintenance cost and preparation of Standard Operation Procedure (SOP) are developed. For the critical component that has been

  14. Preventive Maintenance Scheduling for Multicogeneration Plants with Production Constraints Using Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Khaled Alhamad

    2015-01-01

    Full Text Available This paper describes a method developed to schedule the preventive maintenance tasks of the generation and desalination units in separate and linked cogeneration plants provided that all the necessary maintenance and production constraints are satisfied. The proposed methodology is used to generate two preventing maintenance schedules, one for electricity and the other for distiller. Two types of crossover operators were adopted, 2-point and 4-point. The objective function of the model is to maximize the available number of operational units in each plant. The results obtained were satisfying the problem parameters. However, 4-point slightly produce better solution than 2-point ones for both electricity and water distiller. The performance as well as the effectiveness of the genetic algorithm in solving preventive maintenance scheduling is applied and tested on a real system of 21 units for electricity and 21 units for water. The results presented here show a great potential for utility applications for effective energy management over a time horizon of 52 weeks. The model presented is an effective decision tool that optimizes the solution of the maintenance scheduling problem for cogeneration plants under maintenance and production constraints.

  15. When focusing on a goal interferes with action control: action versus state orientation and over-maintenance of intentions

    NARCIS (Netherlands)

    Ruigendijk, H.A.H.; Koole, S.L.

    2014-01-01

    People vary in action versus state orientation, or the ease versus difficulty by which they can form and enact goals under demanding conditions (Kuhl and Beckmann in Volition and personality: action versus state orientation, Hogrefe, Göttingen, 1994). According to the over-maintenance hypothesis,

  16. After reliability centred maintenance. Preventive maintenance living program implementation at Bruce Power

    International Nuclear Information System (INIS)

    Harazim, Michael L.; Ferguson, Brian J.

    2003-01-01

    Industrial preventive maintenance (PM) programs represent a large part of plant O and M costs. PM Optimization (PMO) projects represent an effective mechanism for identifying unnecessary PM, extending PM intervals and infusing predictive maintenance (PdM) methods. However, once optimized, what process prevents the PM program from returning to a state of disarray? This is the function of a PM living program (PMLP). In 1997, an independent performance assessment identified concerns with the applicability and effectiveness of all Ontario Power Generation, Inc. (OPGI) PM programs. In response, OPGI instituted an Integrated Maintenance Program (IMP) including Reliability Centred Maintenance (RCM) and a PMLP. It should be noted that the PMLP was developed for the 3 OPGI nuclear Sites (i.e. Bruce, Pickering, and Darlington). Effective 1 May 2001, the Bruce Site has been leased to a group of investors lead by British Energy. This paper is written in historical context and therefore refers to the Bruce Site as part of OPGI. The PMLP is made up of five elements: 1) process control, 2) change control, 3) worker feedback, 4) program performance metrics, and 5) deferral module. A PMLP software tool, originally applied to Duke Energy nuclear plants, was enhanced and customized specifically for the OPGI PMLP, and then implemented at all three of OPGI's nuclear sites. The objective of the OPGI PMLP was to: Provide processes/procedures for continual optimization of all site PM tasks, Ensure effective and timely revision of PM tasks in the work management system, Ensure PM tasks remain applicable/effective at all times, Maintain and enhance PM consistency on a component, system and Site basis, Ensure that new predictive maintenance techniques are applied and integrated with the PM program, Ensure that mandated PM tasks are identified and executed, Provide a mechanism for craft feedback, Meet regulatory requirements for PM program effectiveness, and Provide PM task deferral

  17. Preventive maintenance and the interval availability distribution of an unreliable production system

    International Nuclear Information System (INIS)

    Dijkhuizen, G. van; Heijden, M. van der

    1999-01-01

    Traditionally, the optimal preventive maintenance interval for an unreliable production system has been determined by maximizing its limiting availability. Nowadays, it is widely recognized that this performance measure does not always provide relevant information for practical purposes. This is particularly true for order-driven manufacturing systems, in which due date performance has become a more important, and even a competitive factor. Under these circumstances, the so-called interval availability distribution is often seen as a more appropriate performance measure. Surprisingly enough, the relation between preventive maintenance and interval availability has received little attention in the existing literature. In this article, a series of mathematical models and optimization techniques is presented, with which the optimal preventive maintenance interval can be determined from an interval availability point of view, rather than from a limiting availability perspective. Computational results for a class of representative test problems indicate that significant improvements of up to 30% in the guaranteed interval availability can be obtained, by increasing preventive maintenance frequencies somewhere between 10 and 70%

  18. A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty

    International Nuclear Information System (INIS)

    Su, Chun; Wang, Xiaolin

    2016-01-01

    In practice, customers can decide whether to buy an extended warranty or not, at the time of item sale or at the end of the basic warranty. In this paper, by taking into account the moments of customers purchasing two-dimensional extended warranty, the optimization of imperfect preventive maintenance for repairable items is investigated from the manufacturer's perspective. A two-dimensional preventive maintenance strategy is proposed, under which the item is preventively maintained according to a specified age interval or usage interval, whichever occurs first. It is highlighted that when the extended warranty is purchased upon the expiration of the basic warranty, the manufacturer faces a two-stage preventive maintenance optimization problem. Moreover, in the second stage, the possibility of reducing the servicing cost over the extended warranty period is explored by classifying customers on the basis of their usage rates and then providing them with customized preventive maintenance programs. Numerical examples show that offering customized preventive maintenance programs can reduce the manufacturer's warranty cost, while a larger saving in warranty cost comes from encouraging customers to buy the extended warranty at the time of item sale. - Highlights: • A two-dimensional PM strategy is investigated. • Imperfect PM strategy is optimized by considering both two-dimensional BW and EW. • Customers are categorized based on their usage rates throughout the BW period. • Servicing cost of the EW is reduced by offering customized PM programs. • Customers buying the EW at the time of sale is preferred for the manufacturer.

  19. A PSO approach for preventive maintenance scheduling optimization

    International Nuclear Information System (INIS)

    Pereira, C.M.N.A.; Lapa, C.M.F.; Mol, A.C.A.; Luz, A.F. da

    2009-01-01

    This work presents a Particle Swarm Optimization (PSO) approach for preventive maintenance policy optimization, focused in reliability and cost. The probabilistic model for reliability and cost evaluation is developed in such a way that flexible intervals between maintenance are allowed. As PSO is skilled for realcoded continuous spaces, a non-conventional codification has been developed in order to allow PSO to solve scheduling problems (which is discrete) with variable number of maintenance interventions. In order to evaluate the proposed methodology, the High Pressure Injection System (HPIS) of a typical 4-loop PWR has been considered. Results demonstrate ability in finding optimal solutions, for which expert knowledge had to be automatically discovered by PSO. (author)

  20. A preventive maintenance lubricant

    Energy Technology Data Exchange (ETDEWEB)

    Chapaykina, S A; Ol' kov, P L; Pertsev, A N; Rodzevillo, I T; Rogacheva, O I; Zinov' yev, A P

    1980-02-15

    A method is disclosed to lower the adherence of materials by reducing the viscosity of a preventive maintenance lubricant against adhesion of moist, freeflowing materials, containing extract of selective cleaning of oil fractions and asphalt. Gas oil of catalytic cracking is added having a boiling point of 190-300 degrees, with the following ratio of components (%): selective cleaning extract, 43-50; asphalt, 14-16; and gas oil of catalytic cracking, the remainder, Treating a surface with the proposed lubricant lowers the specific resistance to shift of rock compared with the prototype (g/cm/sup 2/): sand (moisture content, 18%) from 3.82 to 1.55; and clay (moisture content 16%), from 5.41 to 3.51.

  1. Preventive maintenance measures and repeat tests on actuators

    International Nuclear Information System (INIS)

    Hueren, H.

    1990-01-01

    At Biblis Nuclear Power Station, about 1500 electrical actuators and variable speed drives of various model ranges and with various driving end speeds and actuating times are installed and about 600 of these are located in important safety engineering systems. In order to optimize the preventive maintenance measures on the drives, a data bank has been established into which are stored, in addition to the fixed type data of each drive, inter alia, statements about location of application, valve type, inspection cycle, calendar year of next maintenance, findings during inspection measures and causes of faults. Before each unit inspection, in addition to the inspection lists, the maintenance and installation records and also the associated job instructions are produced from this data processing equipment. (orig.) [de

  2. Reliability theory with applications to preventive maintenance

    CERN Document Server

    Gertsbakh, Ilya

    2000-01-01

    The material in this book was first presented as a one-semester course in Relia­ bility Theory and Preventive Maintenance for M.Sc. students of the Industrial Engineering Department of Ben Gurion University in the 1997/98 and 1998/99 academic years. Engineering students are mainly interested in the applied part of this theory. The value of preventive maintenance theory lies in the possibility of its imple­ mentation, which crucially depends on how we handle statistical reliability data. The very nature of the object of reliability theory - system lifetime - makes it extremely difficult to collect large amounts of data. The data available are usu­ ally incomplete, e.g. heavily censored. Thus, the desire to make the course material more applicable led me to include in the course topics such as mod­ eling system lifetime distributions (Chaps. 1,2) and the maximum likelihood techniques for lifetime data processing (Chap. 3). A course in the theory of statistics is aprerequisite for these lectures. Stan­ dard...

  3. Control-limit preventive maintenance policies for components subject to imperfect preventive maintenance and variable operational conditions

    International Nuclear Information System (INIS)

    You Mingyi; Li Hongguang; Meng Guang

    2011-01-01

    This paper develops two component-level control-limit preventive maintenance (PM) policies for systems subject to the joint effect of partial recovery PM acts (imperfect PM acts) and variable operational conditions, and investigates the properties of the proposed policies. The extended proportional hazards model (EPHM) is used to model the system failure likelihood influenced by both factors. Several numerical experiments are conducted for policy property analysis, using real lifetime and operational condition data and typical characterization of imperfect PM acts and maintenance durations. The experimental results demonstrate the necessity of considering both factors when they do exist, characterize the joint effect of the two factors on the performance of an optimized PM policy, and explore the influence of the loading sequence of time-varying operational conditions on the performance of an optimized PM policy. The proposed policies extend the applicability of PM optimization techniques.

  4. design of preventive maintenance scheduling model for ...

    African Journals Online (AJOL)

    connected in parallel, Rj(ti) is the reliability of the jth unit at ith time interval, n is the to- tal number of systems (components or units) connected in parallel. Equations (3) and (4) enable us to deter- mine the reliability of all components, units or sub-systems in an industry. 5. System Reliability with Preventive. Maintenance. Fig.

  5. Preventive maintenance for computer systems - concepts & issues ...

    African Journals Online (AJOL)

    Performing preventive maintenance activities for the computer is not optional. The computer is a sensitive and delicate device that needs adequate time and attention to make it work properly. In this paper, the concept and issues on how to prolong the life span of the system, that is, the way to make the system last long and ...

  6. A bivariate process model for maintenance and inspection planning

    NARCIS (Netherlands)

    Newby, M.J.; Barker, C.T.

    2006-01-01

    The paper describes decision making about monitoring and maintenance of systems described by a general stochastic process. The system is monitored and preventive and corrective maintenance actions are carried out in response to the observed system state. The decision process is simplified by using

  7. Performance evaluation of multi-state degraded systems with minimal repairs and imperfect preventive maintenance

    International Nuclear Information System (INIS)

    Soro, Isaac W.; Nourelfath, Mustapha; Ait-Kadi, Daoud

    2010-01-01

    In this paper, we develop a model for evaluating the availability, the production rate and the reliability function of multi-state degraded systems subjected to minimal repairs and imperfect preventive maintenance. The status of the system is considered to degrade with use. These degradations may lead to decrease in the system efficiency. It is assumed that the system can consecutively degrade into several discrete states, which are characterized by different performance rates, ranging from perfect functioning to complete failure. The latter is observed when the degradation level reaches a certain critical threshold such as the system efficiency may decrease to an unacceptable limit. In addition, the system can fail randomly from any operational or acceptable state and can be repaired. This repair action brings the system to its previous operational state without affecting its failure rate (i.e., minimal repair). The used preventive maintenance policy suggests that if the system reaches the last acceptable degraded state, it is brought back to one of the states with higher efficiency. Considering customer demand as constant, the system is modeled as a continuous-time Markov process to assess its instantaneous and stationary performance measures. A numerical example is given to illustrate the proposed model.

  8. Multi-objective group scheduling optimization integrated with preventive maintenance

    Science.gov (United States)

    Liao, Wenzhu; Zhang, Xiufang; Jiang, Min

    2017-11-01

    This article proposes a single-machine-based integration model to meet the requirements of production scheduling and preventive maintenance in group production. To describe the production for identical/similar and different jobs, this integrated model considers the learning and forgetting effects. Based on machine degradation, the deterioration effect is also considered. Moreover, perfect maintenance and minimal repair are adopted in this integrated model. The multi-objective of minimizing total completion time and maintenance cost is taken to meet the dual requirements of delivery date and cost. Finally, a genetic algorithm is developed to solve this optimization model, and the computation results demonstrate that this integrated model is effective and reliable.

  9. Development of preventive maintenance technology and advanced service equipment for operating nuclear power plants

    International Nuclear Information System (INIS)

    Abe, Kazuhiro; Sumikawa, Masaharu; Hirakawa, Hiromasa; Arakawa, Tadao; Hasegawa, Kunio; Kato, Kanji.

    1990-01-01

    Hitachi Ltd. as a manufacturer of nuclear power plants has carried out the consistent general preventive maintenance activities from the planning of the plants and the design of maintainability in the construction phase to the planning and working of preventive maintenance in the operation and maintenance phase, and exerted efforts to heighten the capacity ratio and reliability of the plants. For the purpose, the steady activities of reliability improvement have been carried out throughout the whole company, and the rationalization of the planning and management of the preventive maintenance with a computer and the development of the robots to which Al is applied have been promoted. As the technology of upgrading the facilities, boron racks, the control rods having long life and so on were developed, and their practical use is advanced. Moreover for the future, the development of the diagnostic technology on material deterioration using superconductive quantum interference devices (SQUID) is in progress. The preventive maintenance activities in Hitachi Ltd., the technical development for the purpose and the upgrading of the plant facilities are reported. (K.I.)

  10. Probabilistic sensitivity analysis of optimised preventive maintenance strategies for deteriorating infrastructure assets

    International Nuclear Information System (INIS)

    Daneshkhah, A.; Stocks, N.G.; Jeffrey, P.

    2017-01-01

    Efficient life-cycle management of civil infrastructure systems under continuous deterioration can be improved by studying the sensitivity of optimised preventive maintenance decisions with respect to changes in model parameters. Sensitivity analysis in maintenance optimisation problems is important because if the calculation of the cost of preventive maintenance strategies is not sufficiently robust, the use of the maintenance model can generate optimised maintenances strategies that are not cost-effective. Probabilistic sensitivity analysis methods (particularly variance based ones), only partially respond to this issue and their use is limited to evaluating the extent to which uncertainty in each input contributes to the overall output's variance. These methods do not take account of the decision-making problem in a straightforward manner. To address this issue, we use the concept of the Expected Value of Perfect Information (EVPI) to perform decision-informed sensitivity analysis: to identify the key parameters of the problem and quantify the value of learning about certain aspects of the life-cycle management of civil infrastructure system. This approach allows us to quantify the benefits of the maintenance strategies in terms of expected costs and in the light of accumulated information about the model parameters and aspects of the system, such as the ageing process. We use a Gamma process model to represent the uncertainty associated with asset deterioration, illustrating the use of EVPI to perform sensitivity analysis on the optimisation problem for age-based and condition-based preventive maintenance strategies. The evaluation of EVPI indices is computationally demanding and Markov Chain Monte Carlo techniques would not be helpful. To overcome this computational difficulty, we approximate the EVPI indices using Gaussian process emulators. The implications of the worked numerical examples discussed in the context of analytical efficiency and organisational

  11. A reliability-based preventive maintenance methodology for the projection spot welding machine

    Directory of Open Access Journals (Sweden)

    Fayzimatov Ulugbek

    2018-06-01

    Full Text Available An effective operations of a projection spot welding (PSW machine is closely related to the effec-tiveness of the maintenance. Timely maintenance can prevent failures and improve reliability and maintainability of the machine. Therefore, establishing the maintenance frequency for the welding machine is one of the most important tasks for plant engineers. In this regard, reliability analysis of the welding machine can be used to establish preventive maintenance intervals (PMI and to identify the critical parts of the system. In this reliability and maintainability study, analysis of the PSW machine was carried out. The failure and repair data for analysis were obtained from automobile manufacturing company located in Uzbekistan. The machine was divided into three main sub-systems: electrical, pneumatic and hydraulic. Different distributions functions for all sub-systems was tested and their parameters tabulated. Based on estimated parameters of the analyzed distribu-tions, PMI for the PSW machines sub-systems at different reliability levels was calculated. Finally, preventive measures for enhancing the reliability of the PSW machine sub-systems are suggested.

  12. Preventive Maintenance Interval Prediction: a Spare Parts Inventory Cost and Lost Earning Based Model

    Directory of Open Access Journals (Sweden)

    O. A. Adebimpe

    2015-06-01

    Full Text Available In this paper, some preventive maintenance parameters in manufacturing firms were identified and used to develop cost based functions in terms of machine preventive maintenance. The proposed cost based model considers system’s reliability, cost of keeping spare parts inventory and lost earnings in deriving optimal maintenance interval. A case of a manufacturing firm in Nigeria was observed and the data was used to evaluate the model.

  13. A preventive maintenance model for leased equipment subject to internal degradation and external shock damage

    International Nuclear Information System (INIS)

    Zhou, Xiaojun; Wu, Changjie; Li, Yanting; Xi, Lifeng

    2016-01-01

    A periodic preventive maintenance modeling method is proposed for leased equipment with continuous internal degradation and stochastic external shock damage considered simultaneously, which can facilitate the equipment lessor to optimize the maintenance schedule for the same kind of equipment rented by different lessees. A novel interactive mechanism between the continuous internal degradation and the stochastic external shock damage is established on the hazard rate of the equipment with integrating the imperfect effect of maintenance. Two improvement factors are defined for the modeling of imperfect maintenance. The number of failures resulting from internal degradation and from external shocks are both mathematically deduced based on this interactive mechanism. The optimal preventive maintenance scheme is obtained by minimizing the cumulative maintenance cost throughout the lease period. Numerical example shows that the proposed preventive maintenance model not only can reflect the reliability status of the equipment but also can clearly distinguish between the impact from internal degradation and that from external shocks. - Highlights: • We propose an imperfect periodic preventive maintenance model for leased equipment. • It can distinguish between the impact from internal degradation and that from external shocks. • An internal–external interactive mechanism is proposed. • Two improvement factors are introduced into the modeling of imperfect maintenance. • The model is helpful for the PM scheduling of the same equipment rented by different lessees.

  14. Single-stage Kanban system with deterioration failures and condition-based preventive maintenance

    International Nuclear Information System (INIS)

    Xanthopoulos, A.S.; Koulouriotis, D.E.; Botsaris, P.N.

    2015-01-01

    Despite the fact that the fields of pull type production control policies and condition-based preventive maintenance have much in common contextually, they have evolved independently up to now. In this investigation, an attempt is made to bridge the gap between these two branches of knowledge by introducing the single-stage Kanban system with deterioration failures and condition-based preventive maintenance. The formalism of continuous time Markov chains is used to model the system and expressions for eight performance metrics are derived. Two important, from a managerial perspective, constrained optimization problems for the proposed model are defined where the objective is the simultaneous optimization of the Kanban policy, the preventive maintenance policy and the inspection schedule under conflicting performance criteria. Multiple instances of each optimization problem are solved by means of the augmented Lagrangian genetic algorithm. The results from the optimization trials coupled by the results from extensive numerical examples facilitate the thorough investigation of the system’s behaviour. - Highlights: • Kanban system with deterioration failures and preventive maintenance is introduced. • The system is modeled as a continuous time Markov chain. • Expressions for eight performance metrics are derived. • The behavior of the system is studied through numerical examples. • Optimization results for selected performance metrics are presented

  15. A preventive maintenance model with a two-level inspection policy based on a three-stage failure process

    International Nuclear Information System (INIS)

    Wang, Wenbin; Zhao, Fei; Peng, Rui

    2014-01-01

    Inspection is always an important preventive maintenance (PM) activity and can have different depths and cover all or part of plant systems. This paper introduces a two-level inspection policy model for a single component plant system based on a three-stage failure process. Such a failure process divides the system′s life into three stages: good, minor defective and severe defective stages. The first level of inspection, the minor inspection, can only identify the minor defective stage with a certain probability, but can always reveal the severe defective stage. The major inspection can however identify both defective stages perfectly. Once the system is found to be in the minor defective stage, a shortened inspection interval is adopted. If however the system is found to be in the severe defective stage, we may delay the maintenance action if the time to the next planned PM window is less than a threshold level, but otherwise, replace immediately. This corresponds to the well adopted maintenance policy in practice such as periodic inspections with planned PMs. A numerical example is presented to demonstrate the proposed model by comparing with other models. - Highlights: • The system′s deterioration goes through a three-stage process, namely, normal, minor defective and severe defective. • Two levels of inspections are proposed, e.g., minor and major inspections. • Once the minor defective stage is found, instead of taking a maintenance action, a shortened inspection interval is recommended. • When the severe defective stage is found, we delay the maintenance according to the threshold to the next PM. • The decision variables are the inspection intervals and the threshold to PM

  16. Optimization of maintenance policy using the proportional hazard model

    Energy Technology Data Exchange (ETDEWEB)

    Samrout, M. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: mohamad.el_samrout@utt.fr; Chatelet, E. [Information Sciences and Technologies Institute, University of Technology of Troyes, 10000 Troyes (France)], E-mail: chatelt@utt.fr; Kouta, R. [M3M Laboratory, University of Technology of Belfort Montbeliard (France); Chebbo, N. [Industrial Systems Laboratory, IUT, Lebanese University (Lebanon)

    2009-01-15

    The evolution of system reliability depends on its structure as well as on the evolution of its components reliability. The latter is a function of component age during a system's operating life. Component aging is strongly affected by maintenance activities performed on the system. In this work, we consider two categories of maintenance activities: corrective maintenance (CM) and preventive maintenance (PM). Maintenance actions are characterized by their ability to reduce this age. PM consists of actions applied on components while they are operating, whereas CM actions occur when the component breaks down. In this paper, we expound a new method to integrate the effect of CM while planning for the PM policy. The proportional hazard function was used as a modeling tool for that purpose. Interesting results were obtained when comparison between policies that take into consideration the CM effect and those that do not is established.

  17. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    Morrison, J.F.

    1992-01-01

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  18. Performance-based maintenance of gas turbines for reliable control of degraded power systems

    Science.gov (United States)

    Mo, Huadong; Sansavini, Giovanni; Xie, Min

    2018-03-01

    Maintenance actions are necessary for ensuring proper operations of control systems under component degradation. However, current condition-based maintenance (CBM) models based on component health indices are not suitable for degraded control systems. Indeed, failures of control systems are only determined by the controller outputs, and the feedback mechanism compensates the control performance loss caused by the component deterioration. Thus, control systems may still operate normally even if the component health indices exceed failure thresholds. This work investigates the CBM model of control systems and employs the reduced control performance as a direct degradation measure for deciding maintenance activities. The reduced control performance depends on the underlying component degradation modelled as a Wiener process and the feedback mechanism. To this aim, the controller features are quantified by developing a dynamic and stochastic control block diagram-based simulation model, consisting of the degraded components and the control mechanism. At each inspection, the system receives a maintenance action if the control performance deterioration exceeds its preventive-maintenance or failure thresholds. Inspired by realistic cases, the component degradation model considers random start time and unit-to-unit variability. The cost analysis of maintenance model is conducted via Monte Carlo simulation. Optimal maintenance strategies are investigated to minimize the expected maintenance costs, which is a direct consequence of the control performance. The proposed framework is able to design preventive maintenance actions on a gas power plant, to ensuring required load frequency control performance against a sudden load increase. The optimization results identify the trade-off between system downtime and maintenance costs as a function of preventive maintenance thresholds and inspection frequency. Finally, the control performance-based maintenance model can reduce

  19. PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR

    Directory of Open Access Journals (Sweden)

    Yugowati Praharsi

    2015-06-01

    Full Text Available PT. Artha Prima Sukses Makmur memiliki lima mesin dalam menjalankan kegiatan produksi sol sepatu yang berlangsung 24 jam setiap hari, sehingga kegiatan perawatan dan pemeliharaan perlu dilakukan dengan baik dan dijadwalkan agar tidak mengganggu kegiatan produksi yang sedang berlangsung. Kerusakan mesin saat ini masih terhitung tinggi dan memerlukan waktu perbaikan yang cukup lama. Perancangan penjadwalan maintenancediperlukan untuk mengurangi downtime pada mesin, sehingga tidak menghambat dan mengganggu jadwal produksi. Penjadwalan yang diusulkan adalah preventive maintenance dengan metode age replacement. Berdasarkan prinsip Pareto terdapat dua mesin kritis dari lima mesin yang ada.Hasil perhitungan dari data kerusakan mesin sebelumnya diketahui, jika dilakukan preventive maintenance downtime akan berkurang sebanyak 2.85%, dan terjadi penghematan sebesar 38%.

  20. PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR

    Directory of Open Access Journals (Sweden)

    Yugowati Praharsi

    2015-06-01

    Full Text Available PT. Artha Prima Sukses Makmur memiliki lima mesin dalam menjalankan kegiatan produksi sol sepatu yang berlangsung 24 jam setiap hari, sehingga kegiatan perawatan dan pemeliharaan perlu dilakukan dengan baik dan dijadwalkan agar tidak mengganggu kegiatan produksi yang sedang berlangsung. Kerusakan mesin saat ini masih terhitung tinggi dan memerlukan waktu perbaikan yang cukup lama. Perancangan penjadwalan  maintenancediperlukan untuk mengurangi downtime pada mesin, sehingga tidak menghambat dan mengganggu jadwal produksi. Penjadwalan yang diusulkan adalah preventive maintenance dengan metode age replacement. Berdasarkan prinsip Pareto terdapat dua mesin kritis dari lima mesin yang ada.Hasil perhitungan dari data kerusakan mesin sebelumnya diketahui, jika dilakukan preventive maintenance downtime akan berkurang sebanyak 2.85%, dan terjadi penghematan sebesar 38%.

  1. Fleet equipment performance measurement preventive maintenance model : final report.

    Science.gov (United States)

    2014-04-01

    The concept of preventive maintenance is very important in the effective management and deployment of : vehicle fleets. The Texas Department of Transportation (TxDOT) operates a large fleet of on-road and offroad : equipment. Newer engines and vehicl...

  2. A preventive maintenance policy based on dependent two-stage deterioration and external shocks

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Peng, Rui; Zhai, Qingqing; Zhao, Yu

    2017-01-01

    This paper proposes a preventive maintenance policy for a single-unit system whose failure has two competing and dependent causes, i.e., internal deterioration and sudden shocks. The internal failure process is divided into two stages, i.e. normal and defective. Shocks arrive according to a non-homogeneous Poisson process (NHPP), leading to the failure of the system immediately. The occurrence rate of a shock is affected by the state of the system. Both an age-based replacement and finite number of periodic inspections are schemed simultaneously to deal with the competing failures. The objective of this study is to determine the optimal preventive replacement interval, inspection interval and number of inspections such that the expected cost per unit time is minimized. A case study on oil pipeline maintenance is presented to illustrate the maintenance policy. - Highlights: • A maintenance model based on two-stage deterioration and sudden shocks is developed. • The impact of internal system state on external shock process is studied. • A new preventive maintenance strategy combining age-based replacements and periodic inspections is proposed. • Postponed replacement of a defective system is provided by restricting the number of inspections.

  3. Condition-Based Maintenance Strategy for Production Systems Generating Environmental Damage

    Directory of Open Access Journals (Sweden)

    L. Tlili

    2015-01-01

    Full Text Available We consider production systems which generate damage to environment as they get older and degrade. The system is submitted to inspections to assess the generated environmental damage. The inspections can be periodic or nonperiodic. In case an inspection reveals that the environmental degradation level has exceeded the critical level U, the system is considered in an advanced deterioration state and will have generated significant environmental damage. A corrective maintenance action is then performed to renew the system and clean the environment and a penalty has to be paid. In order to prevent such an undesirable situation, a lower threshold level L is considered to trigger a preventive maintenance action to bring back the system to a state as good as new at a lower cost and without paying the penalty. Two inspection policies are considered (periodic and nonperiodic. For each one of them, a mathematical model and a numerical procedure are developed to determine simultaneously the preventive maintenance (PM threshold L∗ and the inspection sequence which minimize the average long-run cost per time unit. Numerical calculations are performed to illustrate the proposed maintenance policies and highlight their main characteristics with respect to relevant input parameters.

  4. Bayesian based Prognostic Model for Predictive Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    The operation and maintenance costs of offshore wind farms can be significantly reduced if existing corrective actions are performed as efficient as possible and if future corrective actions are avoided by performing sufficient preventive actions. In this paper a prognostic model for degradation...... monitoring, fault prediction and predictive maintenance of offshore wind components is defined. The diagnostic model defined in this paper is based on degradation, remaining useful lifetime and hybrid inspection threshold models. The defined degradation model is based on an exponential distribution...

  5. Bayesian based Prognostic Model for Predictive Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    monitoring, fault prediction and predictive maintenance of offshore wind components is defined. The diagnostic model defined in this paper is based on degradation, remaining useful lifetime and hybrid inspection threshold models. The defined degradation model is based on an exponential distribution......The operation and maintenance costs of offshore wind farms can be significantly reduced if existing corrective actions are performed as efficient as possible and if future corrective actions are avoided by performing sufficient preventive actions. In this paper a prognostic model for degradation...

  6. Bayesian based Prognostic Model for Predictive Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud

    2017-01-01

    monitoring, fault detection and predictive maintenance of offshore wind components is defined. The diagnostic model defined in this paper is based on degradation, remaining useful lifetime and hybrid inspection threshold models. The defined degradation model is based on an exponential distribution......The operation and maintenance costs of offshore wind farms can be significantly reduced if existing corrective actions are performed as efficient as possible and if future corrective actions are avoided by performing sufficient preventive actions. In this paper a prognostic model for degradation...

  7. The cost function for the preventive - maintenance replacement problem

    OpenAIRE

    Vilaplana, Jose Perez

    1994-01-01

    Let a discounted continuous review preventive-maintenance replacement model be such that its total discounted cost is given by means of two functional equations. We assume that downtime is caused by equipment breakdowns, and the length of a given downtime is the time necessary to repair the equipment and set it back in operation. The periodic preventive replacement policy is to replace the equipment by a new identical equipment when service age X is reached, or when the equipment ...

  8. A Grounded Theory Study of Aircraft Maintenance Technician Decision-Making

    Science.gov (United States)

    Norcross, Robert

    Aircraft maintenance technician decision-making and actions have resulted in aircraft system errors causing aircraft incidents and accidents. Aircraft accident investigators and researchers examined the factors that influence aircraft maintenance technician errors and categorized the types of errors in an attempt to prevent similar occurrences. New aircraft technology introduced to improve aviation safety and efficiency incur failures that have no information contained in the aircraft maintenance manuals. According to the Federal Aviation Administration, aircraft maintenance technicians must use only approved aircraft maintenance documents to repair, modify, and service aircraft. This qualitative research used a grounded theory approach to explore the decision-making processes and actions taken by aircraft maintenance technicians when confronted with an aircraft problem not contained in the aircraft maintenance manuals. The target population for the research was Federal Aviation Administration licensed aircraft and power plant mechanics from across the United States. Nonprobability purposeful sampling was used to obtain aircraft maintenance technicians with the experience sought in the study problem. The sample population recruitment yielded 19 participants for eight focus group sessions to obtain opinions, perceptions, and experiences related to the study problem. All data collected was entered into the Atlas ti qualitative analysis software. The emergence of Aircraft Maintenance Technician decision-making themes regarding Aircraft Maintenance Manual content, Aircraft Maintenance Technician experience, and legal implications of not following Aircraft Maintenance Manuals surfaced. Conclusions from this study suggest Aircraft Maintenance Technician decision-making were influenced by experience, gaps in the Aircraft Maintenance Manuals, reliance on others, realizing the impact of decisions concerning aircraft airworthiness, management pressures, and legal concerns

  9. The economy of preventive maintenance of concrete bridges : final report.

    Science.gov (United States)

    2016-03-01

    The most economical approach to maintain existing concrete bridges is by adopting an active preventive maintenance : approach. An in-depth investigation of the combined deterioration effects of various deterioration mechanisms is needed : to establis...

  10. Integrating the sequence dependent setup time open shop problem and preventive maintenance policies

    Directory of Open Access Journals (Sweden)

    K. Naboureh

    2016-09-01

    Full Text Available In most industrial environments, it is usually considered that machines are accessible throughout the planning horizon, but in real situation, machines may be unavailable due to a scheduled preventive maintenance where the periods of unavailability are known in advance. The main idea of this paper is to consider different preventive maintenance policies on machines regarding open shop scheduling problem (OSSP with sequence dependent setup times (SDST using immune algorithm. The preventive maintenance (PM policies are planned for maximizing availability of machines or keeping minimum level of reliability through the production horizon. The objective function of the paper is to minimize makespan. In total, the proposed algorithm extensively is compared with six adaptations of existing heuristic and meta-heuristic methods for the problem through data sets from benchmarks based on Taillard’s instances with some adjustments. The results show that the proposed algorithm outperforms other algorithms for this problem.

  11. RoVi: Continuous transport infrastructure monitoring framework for preventive maintenance

    NARCIS (Netherlands)

    Seraj, Fatjon; Meratnia, Nirvana; Havinga, Paul J.M.

    2017-01-01

    Ground transport infrastructures require in-situ monitoring to evaluate their condition and deterioration and to design appropriate preventive maintenance strategies. Current monitoring practices provide accurate and detailed spatial measurements but often lack the required temporal resolution. This

  12. University of Tennessee - Industry collaborative research and development in preventive maintenance technology

    International Nuclear Information System (INIS)

    Upadhyaya, B.R.

    1992-01-01

    The Preventive Maintenance Engineering Laboratory (PMEL) was inaugurated at the University of Tennessee Nuclear Engineering Department in September 1989. The startup funding was provided by Gilbert/Commonwealth, Inc. The purpose of PMEL is to identify maintenance-related problems in the power and process industries and to find their solutions through the development and application of emerging technologies. These include advanced digital signal processing, applied artificial intelligence (AI), artificial neural networks, and reliability based methods. The Laboratory activities are being expanded by the formation of an industrial consortium within the Measurement and Control Engineering Center at the University of Tennessee. Several research and development projects in preventive maintenance are being carried out. These include condition monitoring of air operated valves, automated diagnostics of motor operated valves, instrument calibration, verification, and estimation of expected residual life of electric motors using applied AI technology and reliability-based methods. The new methodology will be applied to other industrial subsystems. A long-term research and development project is being sponsored by the T.V.A. Nuclear Maintenance Department. The overall objective of the research program is to develop and apply advanced artificial intelligence and information processing methods to the problems of plant performance monitoring and preventive maintenance. The program includes the development of a workstation/PC-based, networking of plant information for easy access to operational and management personnel, implementation of a sensor verification system, monitoring of feedwater flow venturi fouling and heat rate balance, and integration of signal validation, command validation, and fault-tolerant control strategies

  13. A methodology based in particle swarm optimization algorithm for preventive maintenance focused in reliability and cost

    International Nuclear Information System (INIS)

    Luz, Andre Ferreira da

    2009-01-01

    In this work, a Particle Swarm Optimization Algorithm (PSO) is developed for preventive maintenance optimization. The proposed methodology, which allows the use flexible intervals between maintenance interventions, instead of considering fixed periods (as usual), allows a better adaptation of scheduling in order to deal with the failure rates of components under aging. Moreover, because of this flexibility, the planning of preventive maintenance becomes a difficult task. Motivated by the fact that the PSO has proved to be very competitive compared to other optimization tools, this work investigates the use of PSO as an alternative tool of optimization. Considering that PSO works in a real and continuous space, it is a challenge to use it for discrete optimization, in which scheduling may comprise variable number of maintenance interventions. The PSO model developed in this work overcome such difficulty. The proposed PSO searches for the best policy for maintaining and considers several aspects, such as: probability of needing repair (corrective maintenance), the cost of such repairs, typical outage times, costs of preventive maintenance, the impact of maintaining the reliability of systems as a whole, and the probability of imperfect maintenance. To evaluate the proposed methodology, we investigate an electro-mechanical system consisting of three pumps and four valves, High Pressure Injection System (HPIS) of a PWR. Results show that PSO is quite efficient in finding the optimum preventive maintenance policies for the HPIS. (author)

  14. Preventive maintenance scheduling by variable dimension evolutionary algorithms

    International Nuclear Information System (INIS)

    Limbourg, Philipp; Kochs, Hans-Dieter

    2006-01-01

    Black box optimization strategies have been proven to be useful tools for solving complex maintenance optimization problems. There has been a considerable amount of research on the right choice of optimization strategies for finding optimal preventive maintenance schedules. Much less attention is turned to the representation of the schedule to the algorithm. Either the search space is represented as a binary string leading to highly complex combinatorial problem or maintenance operations are defined by regular intervals which may restrict the search space to suboptimal solutions. An adequate representation however is vitally important for result quality. This work presents several nonstandard input representations and compares them to the standard binary representation. An evolutionary algorithm with extensions to handle variable length genomes is used for the comparison. The results demonstrate that two new representations perform better than the binary representation scheme. A second analysis shows that the performance may be even more increased using modified genetic operators. Thus, the choice of alternative representations leads to better results in the same amount of time and without any loss of accuracy

  15. Preventative and predictive maintenance as a function of spare part management

    International Nuclear Information System (INIS)

    LaRose, R.; Sloski, P.

    2006-01-01

    Preventive and predictive maintenance has many aspects, such as vibration monitoring, lubricating oil analysis, thermography etc. This presentation focuses on the material and design application of sealing devices. (author)

  16. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  17. Opportunities and supporting activities to promote preventive maintenance of NPPs in Japan

    International Nuclear Information System (INIS)

    Sanada, A.; Shinkawa, T.; Sakurada, M.

    1998-01-01

    With increase of the number of NPPs and operation history, enhancement of the safety regulation is becoming important for such long-operated NPPs. Centering on the comprehensive preventive maintenance, periodic safety reviews by utilities and its review and evaluation by MITI are in progress. The first reviews have not revealed essential and critical indications to be newly implemented. This means that the most of activities to secure reliability and safety have been done steadily. The present paper addresses the mechanism of on-going preventive maintenance and its essential elements: opportunities to identify issues and problems, and supporting activities to promote decision-makings on feedback, upgrading and modernization of NPPs. (author)

  18. Optimizing production and imperfect preventive maintenance planning's integration in failure-prone manufacturing systems

    International Nuclear Information System (INIS)

    Aghezzaf, El-Houssaine; Khatab, Abdelhakim; Tam, Phuoc Le

    2016-01-01

    This paper investigates the issue of integrating production and maintenance planning in a failure-prone manufacturing system. It is assumed that the system's operating state is stochastically predictable, in terms of its operating age, and that it can accordingly be preventively maintained during preplanned periods. Preventive maintenance is assumed to be imperfect, that is when performed, it brings the manufacturing system to an operating state that lies between ‘as bad as old’ and ‘as good as new’. Only an overhauling of the system brings it to a ‘as good as new’ operating state again. A practical integrated production and preventive maintenance planning model, that takes into account the system's manufacturing capacity and its operational reliability state, is developed. The model is naturally formulated as a mixed-integer non-linear optimization problem, for which an extended mixed-integer linear reformulation is proposed. This reformulation, while it solves the proposed integrated planning problem to optimality, remains quite demanding in terms of computational time. A fix-and-optimize procedure, that takes advantage of some properties of the original model, is then proposed. The reformulation and the fix-and-optimize procedure are tested on some test instances adapted from those available in the literature. The results show that the proposed fix-and-optimize procedure performs quite well and opens new research direction for future improvements. - Highlights: • Integration of production planning and imperfect preventive maintenance is explored. • Imperfect maintenance is modeled using a fitting age reduction hybrid hazard rate. • A practical approximate optimization model for this integration is proposed. • The resulting naturally MINL optimization model is reformulated and solved as a MILP. • An effective fix-and-optimize procedure is proposed for large instances of this MILP.

  19. Action, prevention and epidemiology of paediatric obesity

    DEFF Research Database (Denmark)

    Lissau, Inge

    2005-01-01

    prevention studies, all of which are performed outside Denmark. Thus, this paper is not a classical review but rather a highlight of some aspects that the author finds important. The latest Danish national figures show a marked increase in the prevalence of obesity, especially among young men-a sevenfold...... regarding a national action plan against obesity. CONCLUSION: This paper highlights some important aspects of the epidemiology, prevention and actions in the field of paediatric obesity with special focus on Denmark.......UNLABELLED: The overall aim of this paper is to describe important issues regarding paediatric obesity as a public health problem. This paper focuses on actions taken, and on the prevalence of obesity in children, teens and adults in Denmark. In addition, the paper describes some important...

  20. DEVELOPMENT OF MATHEMATICAL MODELS FOR OPTIMAL PREVENTIVE MAINTENANCE POLICY IN A STEEL INDUSTRY : SIX SIGMA APPROACH

    Directory of Open Access Journals (Sweden)

    N. V. R. Naidu

    2011-09-01

    Full Text Available This paper deals with a critical evaluation of the Preventive Maintenance system in steel industry. This study helps in implementing Six Sigma solutions to reduce the down time of two critical machines i.e., Electric Arc Furnace (EAF and Billet Casting Machine (BCM. It is clear from the analysis of EAF and BCM respectively that, variations in output are quite possible because the machines output not only depend on maintenance time but also on several other variables. Further, the objective is to design a preventive maintenance programme on the same equipment situated in the plant using Six Sigma. The breakdown of these equipments could very well affect the production rate. For this, the mathematical models have been developed and these models are used to obtain the optimum preventive maintenance frequency for minimizing the down time and maximizing the profits.

  1. Verifying elementary ITER maintenance actions with the MS2 benchmark product

    International Nuclear Information System (INIS)

    Heemskerk, C.J.M.; Elzendoorn, B.S.Q.; Magielsen, A.J.; Schropp, G.Y.R.

    2011-01-01

    A new facility has been taken in operation to investigate the influence of visual and haptic feedback on the performance of remotely executed ITER RH maintenance tasks. A reference set of representative ITER remote handling maintenance tasks was included the master slave manipulator system (MS2) benchmark product. The benchmark product was used in task performance tests in a representative two-handed dexterous manipulation test bed at NRG. In the setup, the quality of visual feedback was varied by exchanging direct view with indirect view setups in which visual feedback is provided via video cameras. Interaction forces were measured via an integrated force sensor. The impact of feedback quality on the performance of maintenance tasks at the level of handling individual parts was measured and analysed. Remote execution of the maintenance actions took roughly 3-5 times more time than hands-on. Visual feedback was identified as the dominant factor, including aspects like (lack of) operator control over camera placement, pan, tilt and zoom, lack of 3D perception, image quality, and latency. Haptic feedback was found to be important, but only in specific contact transition and constrained motion tasks.

  2. Joint optimization of maintenance, buffers and machines in manufacturing lines

    Science.gov (United States)

    Nahas, Nabil; Nourelfath, Mustapha

    2018-01-01

    This article considers a series manufacturing line composed of several machines separated by intermediate buffers of finite capacity. The goal is to find the optimal number of preventive maintenance actions performed on each machine, the optimal selection of machines and the optimal buffer allocation plan that minimize the total system cost, while providing the desired system throughput level. The mean times between failures of all machines are assumed to increase when applying periodic preventive maintenance. To estimate the production line throughput, a decomposition method is used. The decision variables in the formulated optimal design problem are buffer levels, types of machines and times between preventive maintenance actions. Three heuristic approaches are developed to solve the formulated combinatorial optimization problem. The first heuristic consists of a genetic algorithm, the second is based on the nonlinear threshold accepting metaheuristic and the third is an ant colony system. The proposed heuristics are compared and their efficiency is shown through several numerical examples. It is found that the nonlinear threshold accepting algorithm outperforms the genetic algorithm and ant colony system, while the genetic algorithm provides better results than the ant colony system for longer manufacturing lines.

  3. 40 CFR 63.7826 - How do I demonstrate initial compliance with the operation and maintenance requirements that...

    Science.gov (United States)

    2010-07-01

    ... preventative maintenance schedule and, as applicable, detailed descriptions of the corrective action procedures... compliance with the operation and maintenance requirements that apply to me? 63.7826 Section 63.7826... Compliance Requirements § 63.7826 How do I demonstrate initial compliance with the operation and maintenance...

  4. Preventative maintenance of straddle carriers

    Directory of Open Access Journals (Sweden)

    Si Li

    2015-04-01

    Objectives: The purpose of this industry-driven study is to model preventative maintenance (PM influences on the operational effectiveness of straddle carriers. Method: The study employs historical data consisting of 21 273 work orders covering a 27-month period. Two models are developed, both of which forecast influences of PM regimes for different types of carrier. Results: The findings of the study suggest that the reliability of the straddle fleet decreases with increased intervals of PM services. The study also finds that three factors – namely resources, number of new straddles, and the number of new lifting work centres – influence the performances of straddles. Conclusion: The authors argue that this collaborative research exercise makes a significant contribution to existing supply chain management literature, particularly in the area of operations efficiency. The study also serves as an avenue to enhance relevant management practice.

  5. Preventive maintenance basis: Volume 1 -- Air-operated valves. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. This document provides a program of PM tasks suitable for application to Air Operated Valves (AOV's) in nuclear power plants. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  6. Determination of Pareto frontier in multi-objective maintenance optimization

    International Nuclear Information System (INIS)

    Certa, Antonella; Galante, Giacomo; Lupo, Toni; Passannanti, Gianfranco

    2011-01-01

    The objective of a maintenance policy generally is the global maintenance cost minimization that involves not only the direct costs for both the maintenance actions and the spare parts, but also those ones due to the system stop for preventive maintenance and the downtime for failure. For some operating systems, the failure event can be dangerous so that they are asked to operate assuring a very high reliability level between two consecutive fixed stops. The present paper attempts to individuate the set of elements on which performing maintenance actions so that the system can assure the required reliability level until the next fixed stop for maintenance, minimizing both the global maintenance cost and the total maintenance time. In order to solve the previous constrained multi-objective optimization problem, an effective approach is proposed to obtain the best solutions (that is the Pareto optimal frontier) among which the decision maker will choose the more suitable one. As well known, describing the whole Pareto optimal frontier generally is a troublesome task. The paper proposes an algorithm able to rapidly overcome this problem and its effectiveness is shown by an application to a case study regarding a complex series-parallel system.

  7. Development of a Preventive Maintenance Program for Tooling Used in Powder Slush Molding

    Energy Technology Data Exchange (ETDEWEB)

    Lara-Curzio, Edgar [ORNL; Rios, Orlando [ORNL; Marquez Rossy, Andres E [ORNL

    2016-07-19

    ORNL collaborated with Faurecia Interior Systems to investigate the feasibility of developing a thermomagnetic preventive maintenance program for nickel tooling used in powder slush molding. It was found that thermal treatments at temperatures greater than 500°C can anneal strain hardening in nickel tooling and a range of temperatures and times for effective thermal annealing were identified. It was also observed that magnetic fields applied during thermal annealing do not alter the kinetics of strain hardening annealing. The results obtained in this investigation provide a foundation for establishing a preventive maintenance program for nickel tooling.

  8. An Enhanced Preventive Maintenance Optimization Model Based on a Three-Stage Failure Process

    Directory of Open Access Journals (Sweden)

    Ruifeng Yang

    2015-01-01

    Full Text Available Nuclear power plants are highly complex systems and the issues related to their safety are of primary importance. Probabilistic safety assessment is regarded as the most widespread methodology for studying the safety of nuclear power plants. As maintenance is one of the most important factors for affecting the reliability and safety, an enhanced preventive maintenance optimization model based on a three-stage failure process is proposed. Preventive maintenance is still a dominant maintenance policy due to its easy implementation. In order to correspond to the three-color scheme commonly used in practice, the lifetime of system before failure is divided into three stages, namely, normal, minor defective, and severe defective stages. When the minor defective stage is identified, two measures are considered for comparison: one is that halving the inspection interval only when the minor defective stage is identified at the first time; the other one is that if only identifying the minor defective stage, the subsequent inspection interval is halved. Maintenance is implemented immediately once the severe defective stage is identified. Minimizing the expected cost per unit time is our objective function to optimize the inspection interval. Finally, a numerical example is presented to illustrate the effectiveness of the proposed models.

  9. Aging management and preventive maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    Bessho, Toichi; Sagawa, Wataru; Oyamada, Osamu; Uchida, Shunsuke

    1995-01-01

    It is expected that nuclear power generation will bear main electric power supply for long term. For this purpose, by applying proper preventive maintenance to the nuclear power plants in operation, the maintenance of high reliability and the rate of plant operation is extremely important. Especially it has been strongly demanded to execute efficiently the periodic inspection which is carried out every year to shorten its period and increase the rate of operation, and to maintain the reliability by the proper maintenance for the aged plants with long operation years. As to efficient and short periodic inspection, the preparation is advanced by the guidance of electric power companies aiming at realizing it in nearest fiscal year, and further, effort is exerted for the development of technology in long term to optimize periodic inspection. For securing the reliability of aged plants, it is important to do proper inspection and diagnosis and to take the countermeasures by repair and replacement, based on the grasp of secular change mechanism and the evaluation of life of machinery, equipment and materials. In particular, effort is exerted for the development of maintenance technology for reactor pressure vessels and in-core equipment which are hard to access. The confirmation of the function of remote operation equipment and the establishment of execution condition are carried out by uisng the full scale mock-up of BWR plant. The problems in maintenance service and the activities and results of reliability improvement are reported. (K.I.)

  10. Preventive maintenance at the Forsmark Nuclear Power Plant

    International Nuclear Information System (INIS)

    Danielsson, H.

    1985-01-01

    The maintenance system at the Forsmark Nuclear Power Plant began in 1975, and was drawn up in co-operation with other power stations within the control of the Swedish State Power Board. Preventive maintenance (PM) is part of the system and has been in operation since 1978. Great efforts have been made to build up the system and to gather input data. Since 1981, the system has been in continuous use; follow-ups and system and quality improvements in database contents have been carried out. Great effort has also been devoted to maintaining a high quality of database contents and to the interplay between the different PM measures. We believe that PM plays an important role in the safety and economic operation of the power station and that it is essential that interest in PM should exist at all levels of the power company. (author)

  11. Where does “whichever occurs first” hold for preventive maintenance modelings?

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Liu, Hu-Chen; Nakagawa, Toshio

    2015-01-01

    The purpose of this paper is to observe where the classical assumption “whichever occurs first” holds for preventive maintenance (PM) modelings. We firstly take up a bivariate maintenance policy where “whichever occurs first” and the newly proposed “whichever occurs last” are respectively used. Modification of PM performance is introduced into modelings to avoid interruptions of job executions, that is, PMs are done only at the end of working cycles. From the points of performability and maintenance cost, we secondly compare the optimized “first” and “last” policies in detail and find two critical points of comparisons analytically. Further, by comparing the “first” and “last” policies with the standard maintenance, modified PM costs are obtained to observe whether it is easy to save PM cost for “whichever occurs first”. For a trivariate maintenance policy, we thirdly propose an entirely new assumption “whichever occurs middle” and give another one model that considers both assumptions of “first” and “last”. We analyze maintenance probabilities for each model and then obtain directly their expected maintenance cost rates for further studies. - Highlights: • A bivariate maintenance policy based on “whichever occurs first” is improved. • Two comparisons of “whichever occurs first and last” are made. • Modified maintenance costs are obtained to observe which policy could save more costs. • New assumption “whichever occurs middle” for the trivariate maintenances is proposed. • One policy is modeled by considering both assumptions of “first” and “last”

  12. The Preventive Signaling Maintenance Crew Scheduling Problem for European Railway Traffic Management system (ERTMS)

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad; Stidsen, Thomas Jacob Riis; Rasmussen, Kourosh Marjani

    , the western part of Denmark. This case is particularly interesting, since the entire railway signalling system is currently being upgraded to the new European Railway Traffic Management System (ERTMS) standard. The new signals need continuous maintenance and in this article we plan the distribution of crew......A railway system is a large and complex infrastructure, which requires continuous maintenance in order to function correctly. Proper maintenance is critical but can also be costly. In this paper we consider the practical case of planning the preventive maintenance of railway signals in Jutland...

  13. [A Structural Equation Model of Pressure Ulcer Prevention Action in Clinical Nurses].

    Science.gov (United States)

    Lee, Sook Ja; Park, Ok Kyoung; Park, Mi Yeon

    2016-08-01

    The purpose of this study was to construct and test a structural equation model for pressure ulcer prevention action by clinical nurses. The Health Belief Model and the Theory of Planned Behavior were used as the basis for the study. A structured questionnaire was completed by 251 clinical nurses to analyze the relationships between concepts of perceived benefits, perceived barriers, attitude, subjective norm, perceived control, intention to perform action and behavior. SPSS 22.0 and AMOS 22.0 programs were used to analyze the efficiency of the hypothesized model and calculate the direct and indirect effects of factors affecting pressure ulcer prevention action among clinical nurses. The model fitness statistics of the hypothetical model fitted to the recommended levels. Attitude, subjective norm and perceived control on pressure ulcer prevention action explained 64.2% for intention to perform prevention action. The major findings of this study indicate that it is essential to recognize improvement in positive attitude for pressure ulcer prevention action and a need for systematic education programs to increase perceived control for prevention action.

  14. Money-back guarantee warranty policy with preventive maintenance strategy for sensor-embedded remanufactured products

    Science.gov (United States)

    Alqahtani, Ammar Y.; Gupta, Surendra M.

    2018-01-01

    In today's global environment, technology is constantly evolving. Being able to stay up-to-date with the very latest technological advances can be extremely hard to accomplish. As a result of these changes and developments in technology, which often come unexpectedly, consumers are frequently tempted to update their devices to the very latest model. The result is that the life cycle of a product is becoming shorter and shorter than before. Manufacturers attempt to respond to consumers' concerns involving environmental issues as well as the more governmentally stringent environmental legislations by establishing facilities which include the minimization of the totality of waste relocated to landfills by recovering materials and components from returned, or End-Of-Life products and reuse them to build a remanufactured product, and/or novel components. With the rapid growth of interest in remanufactured products' market, offering warranty for remanufactured products and components is becoming a necessity for remanufacturer in order to meet customers' requirement and as a marketing mechanism. During that process, maintenance policies are of great importance in order to reduce the warranty cost on the remanufacturer. In this paper, an optimization simulation model for remanufactured items sold with one-dimensional non-renewing money-back guarantee (MBG) warranty policy is proposed from the view of remanufacturer, in which, an End-Of-Life product is subjected to upgrade action at the end of its past life and during the warranty period, preventive maintenance actions are carried out when the remaining life of the product reaches a pre-specified value so that the remanufacturer's expected profit can be maximized. Finally, a numerical example and design of experiment analysis are provided to demonstrate the proposed approach.

  15. Hybrid Optimization Algorithm of Particle Swarm Optimization and Cuckoo Search for Preventive Maintenance Period Optimization

    Directory of Open Access Journals (Sweden)

    Jianwen Guo

    2016-01-01

    Full Text Available All equipment must be maintained during its lifetime to ensure normal operation. Maintenance is one of the critical roles in the success of manufacturing enterprises. This paper proposed a preventive maintenance period optimization model (PMPOM to find an optimal preventive maintenance period. By making use of the advantages of particle swarm optimization (PSO and cuckoo search (CS algorithm, a hybrid optimization algorithm of PSO and CS is proposed to solve the PMPOM problem. The test functions show that the proposed algorithm exhibits more outstanding performance than particle swarm optimization and cuckoo search. Experiment results show that the proposed algorithm has advantages of strong optimization ability and fast convergence speed to solve the PMPOM problem.

  16. Preventive maintenance - An important element in the `risk management` philosophy

    Energy Technology Data Exchange (ETDEWEB)

    Gullev, Lars [VEKS (Denmark)

    1996-11-01

    The contents of the paper is a presentation of the company VEKS with particular focus on the connection between preventive maintenance and the `Risk Management` philosophy. Implementation of Risk Management was preferred instead of an ISO-9000 certification of the company. The experience is that the responsibility in the organisation has been increased. (au)

  17. An approach to integrating surveillance and maintenance tasks to prevent the dominant failure causes of critical components

    International Nuclear Information System (INIS)

    Martorell, S.; Munoz, A.; Serradell, V.

    1995-01-01

    Surveillance requirements and maintenance activities in a nuclear power plant aim to preserve components' inherent reliability. Up to now, predictive and preventive maintenance mainly concerned plant staff, but the US Nuclear Regulatory Commission Maintenance Rule released in July 1991 will have significant impact on how nuclear power plants perform and document this maintenance. Reliability Centered Maintenance (RCM) is a systematic methodology to establish maintenance tasks for critical components in plant with a high degree of compliance with the goals of the Rule. RCM pursues the identification of applicable and efficient tasks to prevent these components from developing their dominant failure causes, and, in turn, towards achieving proper levels of components availability with low cost. In this paper, we present an approach for identifying the most suitable set of tasks to achieve this goal, which involves the integration of maintenance activities and surveillance requirements for each critical component based on the unavailability and cost associated with each individual task which is performed on it

  18. Multi-level predictive maintenance for multi-component systems

    International Nuclear Information System (INIS)

    Nguyen, Kim-Anh; Do, Phuc; Grall, Antoine

    2015-01-01

    In this paper, a novel predictive maintenance policy with multi-level decision-making is proposed for multi-component system with complex structure. The main idea is to propose a decision-making process considered on two levels: system level and component one. The goal of the decision rules at the system level is to address if preventive maintenance actions are needed regarding the predictive reliability of the system. At component level the decision rules aim at identifying optimally a group of several components to be preventively maintained when preventive maintenance is trigged due to the system level decision. Selecting optimal components is based on a cost-based group improvement factor taking into account the predictive reliability of the components, the economic dependencies as well as the location of the components in the system. Moreover, a cost model is developed to find the optimal maintenance decision variables. A 14-component system is finally introduced to illustrate the use and the performance of the proposed predictive maintenance policy. Different sensitivity analysis are also investigated and discussed. Indeed, the proposed policy provides more flexibility in maintenance decision-making for complex structure systems, hence leading to significant profits in terms of maintenance cost when compared with existing policies. - Highlights: • A predictive maintenance policy for complex structure systems is proposed. • Multi-level decision process based on prognostic results is proposed. • A cost-based group importance measure is introduced for decision-making. • Both positive and negative dependencies between components are investigated. • A cost model and Monte Carlo simulation are developed for optimization process.

  19. Stress-reducing preventive maintenance model for a unit under stressful environment

    International Nuclear Information System (INIS)

    Park, J.H.; Chang, Woojin; Lie, C.H.

    2012-01-01

    We develop a preventive maintenance (PM) model for a unit operated under stressful environment. The PM model in this paper consists of a failure rate model and two cost models to determine the optimal PM scheduling which minimizes a cost rate. The assumption for the proposed model is that stressful environment accelerates the failure of the unit and periodic maintenances reduce stress from outside. The failure rate model handles the maintenance effect of PM using improvement and stress factors. The cost models are categorized into two failure recognition cases: immediate failure recognition and periodic failure detection. The optimal PM scheduling is obtained by considering the trade-off between the related cost and the lifetime of a unit in our model setting. The practical usage of our proposed model is tested through a numerical example.

  20. A comprehensive approach to RCM-based preventive maintenance program development

    International Nuclear Information System (INIS)

    Hall, B.E.; Davis, T.; Pennington, A.J.

    1988-01-01

    In late 1986, Public Service Electric and Gas Company (PSE ampersand G) concluded that to support its vision and strategic planning it would be necessary to develop a consistent approach to maintenance for all nuclear units at the artificial island. General Physics Corporation was selected to lead a consultant team to support full-scale development of a preventive maintenance (PM) program for Salem and Hope Creek generating stations based on a reliability-centered maintenance (RCM) approach. RCM was selected because it represents a systematic approach to developing a PM program that provides a logical, consistent, and traceable methodology and produces a well-documented engineering basis for the program. Early in 1987, primary objectives for the PM program were defined. The Phase I tasks addressed key programmatic areas such as maintenance philosophy, procedures, condition monitoring, performance trending, equipment failure data base, ogranization, PM program effectiveness evaluation, RCM process, reliability/availability modeling, information management, training, spare parts, software/hardware, and commitments. Phase I of the PM program development project was completed in January 1988. Highlights of the Phase I work and the PM program manual are described

  1. An evaluation of the Browns Ferry Nuclear Plant preventive maintenance program based on reliability centered maintenance analysis

    International Nuclear Information System (INIS)

    McCullough, C.L.; McCullough, C.A.

    1989-01-01

    Reliability centered maintenance (RCM) techniques were used to support a preventative maintenance (PM) upgrade program (PMUP) performed at TVA Browns Ferry Nuclear Plant (BFNP). The purpose of the RCM analysis was to identify critical equipment based on risk and economic importance and to evaluate the PM activities applicable to that equipment. The analysis may be conveniently divided into three steps, which will be outlined in the Approach section of this paper. The net benefit of the RCM approach was a prioritization of the focus of the PM upgrade program so that plant components receive attention proportional to their importance, and assurance that PM activities properly address the most likely component failure causes

  2. The use of lifetime functions in the optimization of interventions on existing bridges considering maintenance and failure costs

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Seung-Ie [Department of Civil, Enviromental, and Architectural Enginnering, University of Colorado, Campus Box 428, Boulder, CO 80309-0428 (United States)]. E-mail: yangsione@dreamwiz.com; Frangopol, Dan M. [Department of Civil, Enviromental, and Architectural Enginnering, University of Colorado, Campus Box 428, Boulder, CO 80309-0428 (United States)]. E-mail: dan.frangopol@colorado.edu; Kawakami, Yoriko [Hanshin Expressway Public Corporation, Kobe Maintenance Department, 16-1 Shinko-cho Chuo-ku Kobe City, Hyogo, 650-0041 (Japan)]. E-mail: yoriko-kawakami@hepc.go.jp; Neves, Luis C. [Department of Civil, Enviromental, and Architectural Enginnering, University of Colorado, Campus Box 428, Boulder, CO 80309-0428 (United States)]. E-mail: lneves@civil.uminho.pt

    2006-06-15

    In the last decade, it became clear that life-cycle cost analysis of existing civil infrastructure must be used to optimally manage the growing number of aging and deteriorating structures. The uncertainties associated with deteriorating structures require the use of probabilistic methods to properly evaluate their lifetime performance. In this paper, the deterioration and the effect of maintenance actions are analyzed considering the performance of existing structures characterized by lifetime functions. These functions allow, in a simple manner, the consideration of the effect of aging on the decrease of the probability of survival of a structure, as well as the effect of maintenance actions. Models for the effects of proactive and reactive preventive maintenance, and essential maintenance actions are presented. Since the probability of failure is different from zero during the entire service life of a deteriorating structure and depends strongly on the maintenance strategy, the cost of failure is included in this analysis. The failure of one component in a structure does not usually lead to failure of the structure and, as a result, the safety of existing structures must be analyzed using a system reliability framework. The optimization consists of minimizing the sum of the cumulative maintenance and expected failure cost during the prescribed time horizon. Two examples of application of the proposed methodology are presented. In the first example, the sum of the maintenance and failure costs of a bridge in Colorado is minimized considering essential maintenance only and a fixed minimum acceptable probability of failure. In the second example, the expected lifetime cost, including maintenance and expected failure costs, of a multi-girder bridge is minimized considering reactive preventive maintenance actions.

  3. The use of lifetime functions in the optimization of interventions on existing bridges considering maintenance and failure costs

    International Nuclear Information System (INIS)

    Yang, Seung-Ie; Frangopol, Dan M.; Kawakami, Yoriko; Neves, Luis C.

    2006-01-01

    In the last decade, it became clear that life-cycle cost analysis of existing civil infrastructure must be used to optimally manage the growing number of aging and deteriorating structures. The uncertainties associated with deteriorating structures require the use of probabilistic methods to properly evaluate their lifetime performance. In this paper, the deterioration and the effect of maintenance actions are analyzed considering the performance of existing structures characterized by lifetime functions. These functions allow, in a simple manner, the consideration of the effect of aging on the decrease of the probability of survival of a structure, as well as the effect of maintenance actions. Models for the effects of proactive and reactive preventive maintenance, and essential maintenance actions are presented. Since the probability of failure is different from zero during the entire service life of a deteriorating structure and depends strongly on the maintenance strategy, the cost of failure is included in this analysis. The failure of one component in a structure does not usually lead to failure of the structure and, as a result, the safety of existing structures must be analyzed using a system reliability framework. The optimization consists of minimizing the sum of the cumulative maintenance and expected failure cost during the prescribed time horizon. Two examples of application of the proposed methodology are presented. In the first example, the sum of the maintenance and failure costs of a bridge in Colorado is minimized considering essential maintenance only and a fixed minimum acceptable probability of failure. In the second example, the expected lifetime cost, including maintenance and expected failure costs, of a multi-girder bridge is minimized considering reactive preventive maintenance actions

  4. Preventive maintenance basis: Volume 24 -- Battery -- flooded lead-acid (lead-calcium, lead antimony, plante). Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. This document provides a program of preventive maintenance (PM) tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, system engineers, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  5. Preventive maintenance basis: Volume 21 -- HVAC, air handling equipment. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 21 of the report provides a program of PM tasks suitable for application to HVAC-Air Handling Equipment. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  6. Preventive maintenance basis: Volume 15 -- Rotary screw air compressors. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 15 of the report provides a program of PM tasks suitable for application to rotary screw air compressors in nuclear power plants. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  7. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is well below the US Environmental Protection Agency's level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830

  8. Operations and Maintenance Manual for the Temporary Septic Holding Tank at the 100-C Remedial Action Restroom Facility

    International Nuclear Information System (INIS)

    Palmquist, C.A.

    1997-11-01

    The purpose of this document is to provide detailed information regarding the operations and maintenance of the septic holding tank system at the 100-C Remedial Action Restroom Facility. Specific information provided in this document includes the type and frequency of required maintenance and failure response procedures

  9. Operations and Maintenance Manual for the Temporary Septic Holding Tank at the 100-C Remedial Action Support Facility

    International Nuclear Information System (INIS)

    Palmquist, C.A.

    1997-12-01

    The purpose of this document is to provide detailed information regarding the operations and maintenance of the septic holding tank system at the 100-C Remedial Action Restroom Facility. Specific information provided in this document includes the type and frequency of required maintenance and failure response procedures

  10. Modeling of preventive maintenance changes influence upon flight safety indexes

    Directory of Open Access Journals (Sweden)

    А.В. Гончаренко

    2004-03-01

    Full Text Available  It is considered a simplified model of connection between the catastrophic events flow frequency and both preventive maintenance changes periodicity and diagnosis depth of aviation equipment. It is deduced specific formulas for computing the changes and diagnostics parameters influence upon the values of both the catastrophic events flow frequency and technical-economical control factor criterion of flight safety levels.

  11. PWSCC Preventive Maintenance Activities for Alloy 600 in Japanese PWR Plants

    International Nuclear Information System (INIS)

    Yamamoto, K.; Sugimoto, N.; Onishi, K.; Okimura, K.

    2012-01-01

    Because many nuclear plants have been in operation for ages, the importance of preventive maintenance technologies is getting higher. One conspicuous problem found in pressurized water reactor (PWR) plants is the primary water stress corrosion cracking (PWSCC) observed in Alloy 600 (a kind of high nickel based alloy) parts. Alloy 600 was used for butt welds between low alloy steel and stainless steel of nozzles of Reactor Vessel (RV), Steam Generator (SG), and Pressurizer (Pz). As PWSCC occurred at these parts may cause Loss of Coolant Accident (LOCA), preventive maintenance is necessary. PWSCC is considered to be caused by a mixture of three elements: high residual tensile stress on surface, material (Alloy 600) and environment. PWSCC can be prevented by improving one of the elements. MHI has been developing stress improvement methods, for example, Water Jet Peening (WJP), Shot Peening by Ultrasonic vibration (USP), and Laser Stress Improvement Process (L-SIP). According to the situation, appropriate method is applied for each part. WJP has been applied for RV nozzles of a lot of plants in Japan. However PWSCC was observed in RV nozzles during the inspection before WJP in recent years, MHI developed the Advanced INLAY system to improve the material from Alloy 600 to Alloy 690. Alloy 600 on the inner surface of the nozzles is removed and welding with Alloy 690 is performed. In addition, heat treatments for the nozzles are difficult for its structural situation, so ambient temperature temper bead welding technique for RV nozzles was developed to make the heat treatments unnecessary. This paper describes countermeasures against PWSCC and introduces the maintenance activities performed in Japan. (author)

  12. On preventive maintenance policy of a critical reliability level for system subject to degradation

    International Nuclear Information System (INIS)

    Zhao, Y.X.

    2003-01-01

    Conventional preventive maintenance (PM) policies generally hold same time interval for PM actions and are often applied with known failure modes. The same time interval will give unavoidably decreasing reliabilities at the PM actions for degradation system with imperfect PM effect and the known failure modes may be inaccurate in practice. Therefore, field managers would prefer policy with an acceptable reliability level to keep system often at a good state. A PM policy with the critical reliability level is presented to address the preference of field managers. Through assuming that system after a PM action starts a new failure process, a parameter so-called degradation ratio is introduced to represent the imperfect effect. The policy holds a law that there is same number of failures in the time intervals of various PM cycles, and same degradation ratio for the system reliability or benefit parameters such as the optimal time intervals and the hazard rates between the neighboring PM cycles. This law is valid to any of the failure modes that could be appropriately referred as a 'general isodegrading model', and the degradation ratio as a 'general isodegrading ratio'. In addition, life cycle availability and cost functions are derived for system with the policy. An analysis of the field data of a loading and unloading machine indicates that the reliability, availability and cost in life cycle might be well modeled by the present theory and approach

  13. Bayesian based Diagnostic Model for Condition based Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    Operation and maintenance costs are a major contributor to the Levelized Cost of Energy for electricity produced by offshore wind and can be significantly reduced if existing corrective actions are performed as efficiently as possible and if future corrective actions are avoided by performing...... sufficient preventive actions. This paper presents an applied and generic diagnostic model for fault detection and condition based maintenance of offshore wind components. The diagnostic model is based on two probabilistic matrices; first, a confidence matrix, representing the probability of detection using...... for a wind turbine component based on vibration, temperature, and oil particle fault detection methods. The last part of the paper will have a discussion of the case study results and present conclusions....

  14. Status on system inspection and preventive maintenance of HANARO

    International Nuclear Information System (INIS)

    Kim, Young-Ki; Cho, Yeong-Garp; Kwag, Byung-Ho

    1999-01-01

    .III component such as reactor structure, primary pump and pipe etc., is the group for the In-Service Inspection. In the main text, all the activities for each kind of inspection are summarized based on an interval of the required action. General work procedures for the inspection activities, dealing with non-conformances and any required documentation are also briefly discussed. Extensive studies on program and technology are in the process in order to prolong the lifetime of the components and to proceed detail implementation of the system inspection and preventive maintenance. (author)

  15. Operation and maintenance strategies for wave energy converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Marquis, Laurent; Kofoed, Jens Peter

    2015-01-01

    costs including costs due to lost electricity production are minimized. The risk-based approach is compared with an approach where only boats are used and another approach where the target is to minimize the downtime of the device. This article presents a dynamic approach for total operation......Inspection and maintenance costs are a significant contributor to the cost of energy for wave energy converters. There are different operation and maintenance strategies for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs....... Furthermore, a helicopter and boats can be used to transport equipment and personnel to the device, or the whole device can be towed to a harbour for operation and maintenance actions. This article describes, among others, a risk-based inspection and maintenance planning approach where the overall repair...

  16. Optimisation of distributed maintenance: Modelling and application to the multi-factory production

    Energy Technology Data Exchange (ETDEWEB)

    Simeu-Abazi, Zineb, E-mail: Zineb.Simeu-Abazi@g-scop.inpg.fr [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France); Ahmad, Alali Alhouaij [Laboratory G-SCOP, 46 Avenue Felix Viallet, 38031 Grenoble Cedex 1 (France)

    2011-11-15

    This paper concerns the modelling and the cost evaluation of maintenance activities in a distributed context. In this work we study the particular case where the maintenance activities are executed by two workshops: a central maintenance workshop (CMW) and a mobile maintenance workshop (MMW). The CMW concerns the repairing process for the corrective maintenance and the MMW executes all preventive maintenance in several factories according to a defined scheduling. The aim is to take into account the resources (spare parts in the MMW) and maintenance actions for a given operating budget. A modular approach for modelling a multi-site structure is proposed to achieve the aim of improving the availability of facilities on production sites while minimising the cost of maintenance.

  17. Using heuristic search for optimizing maintenance plans

    International Nuclear Information System (INIS)

    Mutanen, Teemu

    2012-01-01

    This work addresses the maintenance action selection process. Maintenance personnel need to evaluate maintenance actions and costs to keep the machines in working condition. Group of actions are evaluated together as maintenance plans. The maintenance plans as output provide information to the user about which actions to take if any and what future actions should be prepared for. The heuristic search method is implemented as part of general use toolbox for analysis of measurements from movable work machines. Impacts from machine's usage restrictions and maintenance activities are analysed. The results show that once put on a temporal perspective, the prioritized order of the actions is different and provide additional information to the user.

  18. Preventive maintenance instrumentation results in Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Curiel, M.; Palomo, M. J.; Verdu, G.; Arnaldos, A.

    2010-10-01

    This paper is a recompilation of the most significance results in relation to the researching in preventive and predictive maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and the Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the power plants control and instrumentation department's technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the object to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish nuclear power plants each of them shall give a significant contribution to problem resolution and power plant performance. (Author)

  19. Methods and tools in development in the field of maintenance; Methodes et outils pour la maintenance en cours de developpement

    Energy Technology Data Exchange (ETDEWEB)

    Le Reverend, D.; Tortolano, M. [Electricite de France (EDF/RD), 78 - Chatou (France); Leniaud, F. [Electricite de France (EDF), Div. Production Nuleaire, 93 - Saint-Denis (France)

    2004-07-01

    This article is dedicated to the maintenance strategy followed by EDF for its nuclear power plants. This strategy is based on the American method RCM (reliability centered method) that has been extended to passive components such as structures and relies on 4 axis. The first axis can be defined as the optimization of maintenance with regard to safety, outage and costs. The aim is to set the border between preventive maintenance and remedial maintenance. The second axis is the condition based maintenance that is the maintenance action that is triggered by the real state of the equipment. This type of maintenance implies the search for reliable and accurate diagnostics. The third axis is the design of simulation and planning tools required for the management of the moving of tools, machinery and spare-parts on a maintenance work site. The fourth axis is the design of tools able to repair some important equipment, this way may be a valid alternative to the replacement of equipment in terms of cost and outage time. (A.C.)

  20. Preventive maintenance and load testing of fixed position cranes in support of major operations

    International Nuclear Information System (INIS)

    Detrick, C.K.

    1980-01-01

    This paper will address load testing and preventive maintenance of fixed in-place cranes in general, and maintenance and load testing of the 200 ton Polar Gantry Crane at the FFTF in particular. This paper also covers the installation of a 100-ton bridge crane in the FFTF's Reactor Service Building, as well as use of these cranes in making important lifts of FFTF equipment

  1. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Gustafason, D.L.

    2001-01-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential

  2. EPR design for maintenance

    International Nuclear Information System (INIS)

    Krugmann, U.

    1998-01-01

    Preventive maintenance is very important in achieving high plant availability. For the European Pressurized Reactor (EPR) preventive maintenance has been carefully addressed in the design stage. This is particularly necessary because of the traditionally different maintenance strategies employed in France and Germany. This paper emphasizes the following features introduced in the ERP design to minimize the duration of the refueling outage: (1) containment accessibility during power operation; (2) overall plant layout to facilitate inspections and maintenances within the containment; and (3) safety system design for enabling preventive maintenance during power operation. (author)

  3. Joint Optimization of Preventive Maintenance and Spare Parts Inventory with Appointment Policy

    Directory of Open Access Journals (Sweden)

    Jing Cai

    2017-01-01

    Full Text Available Under the background of the wide application of condition-based maintenance (CBM in maintenance practice, the joint optimization of maintenance and spare parts inventory is becoming a hot research to take full advantage of CBM and reduce the operational cost. In order to avoid both the high inventory level and the shortage of spare parts, an appointment policy of spare parts is first proposed based on the prediction of remaining useful lifetime, and then a corresponding joint optimization model of preventive maintenance and spare parts inventory is established. Due to the complexity of the model, the combination method of genetic algorithm and Monte Carlo is presented to get the optimal maximum inventory level, safety inventory level, potential failure threshold, and appointment threshold to minimize the cost rate. Finally, the proposed model is studied through a case study and compared with both the separate optimization and the joint optimization without appointment policy, and the results show that the proposed model is more effective. In addition, the sensitivity analysis shows that the proposed model is consistent with the actual situation of maintenance practices and inventory management.

  4. Penerapan Preventive Maintenance Untuk Meningkatkan Reliability Pada Boiler Feed Pump PLTU Tarahan Unit 3 & 4

    OpenAIRE

    Saputra, Melki

    2015-01-01

    Pemeliharaan dan perawatan merupakan kegiatan untuk menjamin mesin dapat bekerja sebagaimana mestinya. Pemeliharaan dan perawatan menyeluruh untuk meningkatkan produktivitas perusahaan dikenal dengan Preventive Maintenance. pemeliharaan keterlibatan operator melalui kegiatan autonomous maintenance. PT. PLN (Persero) Pembangkitan Sumatera Bagian Selatan Sektor Tarahan merupakan salah satu perusahaan penghasil listrik dan semua mesinnya beroperasi selama 24 jam. Beroperasinya mesin secara c...

  5. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  6. Preventive maintenance instrumentation results in Spanish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Curiel, M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Palomo, M. J.; Verdu, G. [ISIRYM, Universidad Politecnica de Valencia, Camino de Vera s/n, Valencia (Spain); Arnaldos, A., E-mail: m.curiel@lainsa.co [TITANIA Servicios Tecnologicos SL, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain)

    2010-10-15

    This paper is a recompilation of the most significance results in relation to the researching in preventive and predictive maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and the Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the power plants control and instrumentation department's technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the object to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish nuclear power plants each of them shall give a significant contribution to problem resolution and power plant performance. (Author)

  7. Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems

    International Nuclear Information System (INIS)

    Geetha, T.; Swarup, K. Shanti

    2009-01-01

    Preventive maintenance of generating units and lines, in a competitive electric energy environment is proposed. Inclusion of transmission constraints and forced outage rates, over a specified operational period is considered. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period, for which Bender's decomposition technique is used. The objective of the GENCO is to maximize profit or to minimize loss in profit, for which transmission constrained price based unit commitment (TCPBUC), based on Lagrangian relaxation method is used. Bender's decomposition technique is used for line maintenance, with adequate level of reliability. A coordinating technique using penalty factors is incorporated to obtain convergence of the conflicting objectives. The transmission constraints are modeled using dc sensitivity factors. Detailed case studies of six-bus systems and IEEE RTS system are presented and discussed. (author)

  8. Constrained non-linear multi-objective optimisation of preventive maintenance scheduling for offshore wind farms

    Science.gov (United States)

    Zhong, Shuya; Pantelous, Athanasios A.; Beer, Michael; Zhou, Jian

    2018-05-01

    Offshore wind farm is an emerging source of renewable energy, which has been shown to have tremendous potential in recent years. In this blooming area, a key challenge is that the preventive maintenance of offshore turbines should be scheduled reasonably to satisfy the power supply without failure. In this direction, two significant goals should be considered simultaneously as a trade-off. One is to maximise the system reliability and the other is to minimise the maintenance related cost. Thus, a non-linear multi-objective programming model is proposed including two newly defined objectives with thirteen families of constraints suitable for the preventive maintenance of offshore wind farms. In order to solve our model effectively, the nondominated sorting genetic algorithm II, especially for the multi-objective optimisation is utilised and Pareto-optimal solutions of schedules can be obtained to offer adequate support to decision-makers. Finally, an example is given to illustrate the performances of the devised model and algorithm, and explore the relationships of the two targets with the help of a contrast model.

  9. Optimum policies for a system with general imperfect maintenance

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Lin, Y.-B.; Liao, G.-L.

    2006-01-01

    This study considers periodic preventive maintenance policies, which maximizes the availability of a repairable system with major repair at failure. Three types of preventive maintenance are performed, namely: imperfect preventive maintenance (IPM), perfect preventive maintenance (PPM) and failed preventive maintenance (FPM). The probability that preventive maintenance is perfect depends on the number of imperfect maintenances conducted since the previous renewal cycle, and the probability that preventive maintenance remains imperfect is not increasing. The optimum preventive maintenance time that maximizes availability is derived. Various special cases are considered. A numerical example is given

  10. Benchmarking government action for obesity prevention--an innovative advocacy strategy.

    Science.gov (United States)

    Martin, J; Peeters, A; Honisett, S; Mavoa, H; Swinburn, B; de Silva-Sanigorski, A

    2014-01-01

    Successful obesity prevention will require a leading role for governments, but internationally they have been slow to act. League tables of benchmark indicators of action can be a valuable advocacy and evaluation tool. To develop a benchmarking tool for government action on obesity prevention, implement it across Australian jurisdictions and to publicly award the best and worst performers. A framework was developed which encompassed nine domains, reflecting best practice government action on obesity prevention: whole-of-government approaches; marketing restrictions; access to affordable, healthy food; school food and physical activity; food in public facilities; urban design and transport; leisure and local environments; health services, and; social marketing. A scoring system was used by non-government key informants to rate the performance of their government. National rankings were generated and the results were communicated to all Premiers/Chief Ministers, the media and the national obesity research and practice community. Evaluation of the initial tool in 2010 showed it to be feasible to implement and able to discriminate the better and worse performing governments. Evaluation of the rubric in 2011 confirmed this to be a robust and useful method. In relation to government action, the best performing governments were those with whole-of-government approaches, had extended common initiatives and demonstrated innovation and strong political will. This new benchmarking tool, the Obesity Action Award, has enabled identification of leading government action on obesity prevention and the key characteristics associated with their success. We recommend this tool for other multi-state/country comparisons. Copyright © 2013 Asian Oceanian Association for the Study of Obesity. Published by Elsevier Ltd. All rights reserved.

  11. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  12. Preventive actions taken by workers after workers' health surveillance: a controlled trial.

    Science.gov (United States)

    Boschman, J S; Van der Molen, H F; Frings-Dresen, M H W; Sluiter, J K

    2013-12-01

    To evaluate construction workers' preventive actions and occupational physician's (OPs) recommendations after a job-specific workers' health surveillance (WHS) compared with the currently used generic WHS. After the WHS, the OPs' written recommendations were captured. At the 3-month follow-up, the workers were asked about the preventive actions they had undertaken. A generalized linear mixed model was used to compare proportions of workers. At follow-up, the proportion of workers who reported taking preventive actions was significantly higher in the intervention group (80%, 44/55) than in the control group (67%, 80 of 121), (P = 0.04). In the intervention group, the OPs provided a higher proportion of workers with written recommendations (82%, 63 of 77, vs 57%, 69 of 121; P = 0.03). The job-specific WHS aided OPs in providing workers with recommendations and workers in undertaking (job-specific) preventive actions.

  13. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  14. Presenting a model of repair and preventing maintenance of Bushehr nuclear power plants analyzing the data of similar nuclear power plants

    International Nuclear Information System (INIS)

    Parikhan, Hammidreza

    1997-01-01

    Due to the increase application of nuclear energy for producing electricity, special attention must be paid to their maintenance activities in general and preventive maintenance in particular. It has been shown that a well established preventive maintenance programme will enhance the reliability and availability of nuclear power plants. A model of preventive maintenance for Buhehr nuclear power plant which is due to be completed by 2001 is developed. The prescribed model is based on past experiences of VVER nuclear power plants around the world. The utilized data is provided by International Atomic Energy Agency (IAEA) in Vienna, Austria. The data and past experiences reveal such important information as availability, energy loss, types of failures, duration of failure, etc. A strategy for designing a database is established. These data are then analyzed by statistical methods such as Pareto analysis, t-test, K-S test, analysis of variance, etc. The results of our analysis reveal important information in regard to establishment of a well-defined preventive maintenance programme in Buhshehr nuclear power plant. The results show that certain equipment such turbo-generator and control-rods play an important role in the maintenance of a VVER nuclear power plant. Other findings are discussed in great detail

  15. Networks for prevention of violence: from utopia to action

    Directory of Open Access Journals (Sweden)

    Kathie Njaine

    2006-06-01

    Full Text Available This article aims to discuss the experience of networks for the protection of people exposed to situations of violence or prevention networks. It is based on the concept created by Castells, who defines the information age. This study is part of the investigation "Successful experiences in the prevention of violence", carried out by the Latin-American Center for Studies on Violence Jorge Careli/ENSP-IFF/Fiocruz, in cooperation with the Secretariat for Health Survey of the Ministry of Health. The article analyzes the possibilities and limitations in the construction of networks for the prevention of violence, seeking to understand the sense of actions and movements carried out in networks. The method we used is a case study of two network initiatives in the Southern region of the country. In terms of results, in face of the difficulties of working in networks, we found it to be necessary: to break with sectorial and vertical actions; to promote constant communication and interchange of information; to permanently train the professionals and persons involved in the network, incorporating them into the protective and preventive actions; and to promote the participation of wide social sectors. In conclusion, one can affirm that the construction of a protection network involves complex steps, looking to the same problem with new eyes and a new vision for planting solutions.

  16. Sensitivity of Risk-Based Maintenance Planning of Offshore Wind Turbine Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    2017-01-01

    Inspection and maintenance expenses cover a considerable part of the cost of energy from offshore wind turbines. Risk-based maintenance planning approaches are a powerful tool to optimize maintenance and inspection actions and decrease the total maintenance expenses. Risk-based planning is based...... on many input parameters, which are in reality often not completely known. This paper will assess the cost impact of this incomplete knowledge based on a case study following risk-based maintenance planning. The sensitivity study focuses on weather forecast uncertainties, incomplete knowledge about...... the needed repair time on the site as well as uncertainties about the operational range of the boat and helicopter used to access the broken wind turbine. The cost saving potential is estimated by running Crude Monte Carlo simulations. Furthermore, corrective and preventive (scheduled and condition...

  17. Proposal for monitoring concrete painting as a preventive maintenance tool (Abutments and pier caps).

    Science.gov (United States)

    2017-07-01

    One of the growing number of preventive bridge maintenance activities conducted by the Kentucky Transportation Cabinet (KYTC) is washing and applying thin film protective coatings to bridge abutments and piers. Previous work conducted by Kentucky Tra...

  18. Preventive maintenance program for a research and production reactor

    International Nuclear Information System (INIS)

    Rico, N.A.

    1990-01-01

    This program proposes a simple, rapid and efficient methodology for the task of developing a really preventive maintenance discipline. Moreover, the lower cost of its application -since it must satisfy the plant's budget-. To this purpose, an extremely economical and easily obtainable infrastructure is proposed. The following stage is referred to the commissioning system, subsequent supervision and follow-up. The experience gained from the two reactors as RA-6 (Bariloche Atomic Center) and NUR (RAE) of Argelia. Finally, the interacting characteristic of this program, since it may be rapidly adapted to different dimensions of plants, laboratories, etc., must be pointed out. (Author) [es

  19. Optimal maintenance policy for a system subject to damage in a discrete time process

    International Nuclear Information System (INIS)

    Chien, Yu-Hung; Sheu, Shey-Huei; Zhang, Zhe George

    2012-01-01

    Consider a system operating over n discrete time periods (n=1, 2, …). Each operation period causes a random amount of damage to the system which accumulates over time periods. The system fails when the cumulative damage exceeds a failure level ζ and a corrective maintenance (CM) action is immediately taken. To prevent such a failure, a preventive maintenance (PM) may be performed. In an operation period without a CM or PM, a regular maintenance (RM) is conducted at the end of that period to maintain the operation of the system. We propose a maintenance policy which prescribes a PM when the accumulated damage exceeds a pre-specified level δ ( ⁎ and N ⁎ and discuss some useful properties about them. It has been shown that a δ-based PM outperforms a N-based PM in terms of cost minimization. Numerical examples are presented to demonstrate the optimization of this class of maintenance policies.

  20. Preventive maintenance basis: Volume 16 -- Power operated relief valves, solenoid actuated. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. This volume 16 of the report provides a program of PM tasks suitable for application to power operated relief valves (PORV's) that are solenoid actuated. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  1. A modeling framework for deteriorating control system and predictive maintenance of actuators

    International Nuclear Information System (INIS)

    Langeron, Y.; Grall, A.; Barros, A.

    2015-01-01

    Actuators play a central role in industrial automation systems. They are costly, and therefore studying their dependability needs all attention. Usually, an actuator is inserted in a feedback control system, and its mission is to implement a control action delivered by a controller. In this paper, a monotonic actuator deterioration is considered and it is assumed that a relationship exists between the control action and the physical actuator's deterioration. A modeling framework is proposed including a non-decreasing stochastic degradation process driving the inability for an actuator to fully implement its role. The prognosis of the actuator's residual useful lifetime is derived and used to update the controller's setting. The controller reconfiguration completes the maintenance corrective and preventive actions. This new action is suggested as an alternative for maintenance strategy. - Highlights: • A degrading control system model is proposed focusing on actuator deterioration. • It is assumed a relationship between this degradation and its loss of efficiency. • The actuator RUL is quantified as a quantile of its conditional survival function. • RUL prognosis is used to reconfigure the control input law. • This new action is suggested as an alternative for maintenance strategy

  2. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  3. New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization

    International Nuclear Information System (INIS)

    Samrout, M.; Yalaoui, F.; Cha-hat telet, E.; Chebbo, N.

    2005-01-01

    This article is based on a previous study made by Bris, Chatelet and Yalaoui [Bris R, Chatelet E, Yalaoui F. New method to minimise the preventive maintenance cost of series-parallel systems. Reliab Eng Syst Saf 2003;82:247-55]. They use genetic algorithm to minimize preventive maintenance cost problem for the series-parallel systems. We propose to improve their results developing a new method based on another technique, the Ant Colony Optimization (ACO). The resolution consists in determining the solution vector of system component inspection periods, T P . Those calculations were applied within the programming tool Matlab. Thus, highly interesting results and improvements of previous studies were obtained

  4. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  5. Operation and maintenance manual for the temporary septic holding tank at the 100-D remedial action support facility. Revision 1

    International Nuclear Information System (INIS)

    Kelty, G.G.

    1996-09-01

    This manual provides detailed information for the operation and maintenance of the sanitary wastewater holding system at the 100-D Remedial Action Support Facility located in the 100-DR-1 Operable Unit of the Hanford Site. This document describes operations, including the type and frequency of required maintenance, and system failure response procedures

  6. Advancing complex explanatory conceptualizations of daily negative and positive affect: trigger and maintenance coping action patterns.

    Science.gov (United States)

    Dunkley, David M; Ma, Denise; Lee, Ihno A; Preacher, Kristopher J; Zuroff, David C

    2014-01-01

    The present study addressed a fundamental gap between research and clinical work by advancing complex explanatory conceptualizations of coping action patterns that trigger and maintain daily negative affect and (low) positive affect. One hundred ninety-six community adults completed measures of perfectionism, and then 6 months later completed questionnaires at the end of the day for 14 consecutive days to provide simultaneous assessments of appraisals, coping, and affect across different stressful situations in everyday life. Multilevel structural equation modeling (MSEM) supported complex explanatory conceptualizations that demonstrated (a) disengagement trigger patterns consisting of several distinct appraisals (e.g., event stress) and coping strategies (e.g., avoidant coping) that commonly operate together across many different stressors when the typical individual experiences daily increases in negative affect and drops in positive affect; and (b) disengagement maintenance patterns composed of different appraisal and coping maintenance factors that, in combination, can explain why individuals with higher levels of self-critical perfectionism have persistent daily negative affect and low positive mood 6 months later. In parallel, engagement patterns (triggers and maintenance) composed of distinct appraisals (e.g., perceived social support) and coping strategies (e.g., problem-focused coping) were linked to compensatory experiences of daily positive affect. These findings demonstrate the promise of using daily diary methodologies and MSEM to promote a shared understanding between therapists and clients of trigger and maintenance coping action patterns that explain what precipitates and perpetuates clients' difficulties, which, in turn, can help achieve the 2 overarching therapy goals of reducing clients' distress and bolstering resilience. (c) 2014 APA, all rights reserved.

  7. Preventive maintenance instrumentation results in Spanish nuclear power plants

    International Nuclear Information System (INIS)

    Palomo Anaya, M. Jose; Verdu Martin, Gumersindo; Arnaldos Gonzalvez, Adoracion; Nieva, Marcelino Curiel

    2011-01-01

    This paper is a recompilation of the most significant results in relation to the researching in Preventive and Predictive Maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and The Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the Power Plants Control and Instrumentation Department technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the aim to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish Nuclear Power Plants each of them shall give a significant contribution to problem resolution and power plant performance: Fluctuations in sensor lines (case 1), Air presence in feed water lines (case 2), Root valve partially closed (case 3), Sensor malfunctions (case 4), Electrical source malfunctions (case 5), RTD malfunctions (case 6) and LPRM malfunctions (case 7). (author)

  8. Preventive maintenance instrumentation results in Spanish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Palomo Anaya, M. Jose; Verdu Martin, Gumersindo, E-mail: mpalomo@iqn.upv.es, E-mail: gverdu@iqn.upv.es [ISIRYM Universidad Politecnica de Valencia, Valencia (Spain); Arnaldos Gonzalvez, Adoracion, E-mail: a.arnaldos@titaniast.com [TITANIA Servicios Tecnologicos SL, Valencia (Spain); Nieva, Marcelino Curiel, E-mail: m.curiel@lainsa.com [Logistica y Acondicionamientos Industriales SAU (LAINSA), Valencia (Spain)

    2011-07-01

    This paper is a recompilation of the most significant results in relation to the researching in Preventive and Predictive Maintenance in critical nuclear instrumentation for power plant operation, which it is being developed by Logistica y Acondicionamientos Industriales and The Isirym Institute of the Polytechnic University of Valencia. Instrumentation verification and test, it is a priority of the Power Plants Control and Instrumentation Department technicians. These procedures are necessary information for the daily power plant work. It is performed according to different procedures and in different moments of the fuel cycle depending on the instrumentation critical state and the monitoring process. Normally, this study is developed taking into account the instantaneous values of the instrumentation measures and, after their conversion to physical magnitude, they are analyzed according to the power plant operation point. Moreover, redundant sensors measurements are taken into consideration to the equipment and/or power plant monitoring. This work goes forward and it is in advanced to the instrument analysis as it is, independently of the operation point, using specific signal analysis techniques for preventive and predictive maintenance, with the aim to obtain not only information about possible malfunctions, but the degradation scale presented in the instrument or in the system measured. We present seven real case studies of Spanish Nuclear Power Plants each of them shall give a significant contribution to problem resolution and power plant performance: Fluctuations in sensor lines (case 1), Air presence in feed water lines (case 2), Root valve partially closed (case 3), Sensor malfunctions (case 4), Electrical source malfunctions (case 5), RTD malfunctions (case 6) and LPRM malfunctions (case 7). (author)

  9. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  10. Webinar: Making the Connection: Linking IAQ, Energy Efficiency and Preventive Maintenance Together for Healthy Schools

    Science.gov (United States)

    A page to register to view the February 22, 2018, Energy Savings Plus Health for Schools Webinar Series Webinar: Making the Connection: Linking IAQ, Energy Efficiency and Preventive Maintenance Together for Healthy Schools

  11. A model for determining condition-based maintenance policies for deteriorating multi-component systems

    NARCIS (Netherlands)

    Hontelez, J.A.M.; Wijnmalen, D.J.D.

    1993-01-01

    We discuss a method to determine strategies for preventive maintenance of systems consisting of gradually deteriorating components. A model has been developed to compute not only the range of conditions inducing a repair action, but also inspection moments based on the last known condition value so

  12. Operation and maintenance manual for the temporary septic holding tank at the 100-D remedial action support facility. Revision 2

    International Nuclear Information System (INIS)

    Kelty, G.G.

    1996-10-01

    This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system at the 100-D Remedial Action Support Facility located in the 100-DR-1 Operable Unit at the Hanford Site. This document describes operations, including the type and frequency of required maintenance, and system failure response procedures

  13. A Study of the Unsafe Actions of Staff in the Maintenance and Overhaul Unit at a Petrochemical Complex and the Presentation of Control Strategies

    Directory of Open Access Journals (Sweden)

    Mousavipour

    2016-02-01

    Full Text Available Background Today, oil, gas, and petrochemical industries are of strategic significance in the macro-development of oil-rich countries. These industries, given the nature of the work and the technical complexity of the various processes, are hazardous and susceptible to occupational accidents. More than 90% of the accidents are related to the faults and unsafe actions of personnel, either directly or indirectly. Objectives The aim of this study is to investigate the unsafe actions of staff working in the maintenance unit of a petrochemical complex. Materials and Methods This is a descriptive and analytical study conducted on 167 morning-shift workers at the Mahshahr petrochemical complex. The data were collected based on a checklist of unsafe actions prepared through a direct observation of their activities and an analysis of work instructions, documents, and incident reports. SPSS statistical software was also used for data analysis and relevant testing. Results According to the results of this study, the mean number of unsafe actions performed by the employees was 42%. The highest number of unsafe actions achieved in the maintenance mechanical unit was 52.8%, 47.1% in repair services, and 43.8% in machinery. The highest frequency of unsafe actions were caused by indiscretion and negligence, a failure to use a face shield and goggles, and non-compliance with safety principles. Conclusions According to the findings, there has been a rise in the number of unsafe actions in machinery and maintenance service units compared to other maintenance units. As such, training courses based on the behavior-based safety principles at the beginning of employment, close monitoring of health safety environment (HSE officials on the implementation of regulations, and provision of appropriate scheduling based on weather conditions and the nature of maintenance services are recommended. In addition, a refrainment from hastiness in performing duties, enhanced

  14. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  15. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  16. Modeling of the maintenance policy of an offshore wind farm

    International Nuclear Information System (INIS)

    Maddens, L.; Labeau, P.E.

    2004-01-01

    Wind energy has a key position in the market of renewable electricity production means. Offshore wind farms offer additional surfaces to exploit this form of energy, together with more favourable wind conditions. Yet offshore windmills ask for higher investment and maintenance costs. Optimising the latter costs should therefore turn out to be particularly beneficial for this technology. The present paper summarizes the main modelling aspects of the maintenance of a typical offshore wind farm, such as the accessibility of the wind turbines and the impact of weather conditions, the cost of the different transport resources, the number of maintenance teams, a tolerated unavailability of part of the windmills, the opportunity to combine corrective and preventive maintenance actions on one or several windmills. All these features were embedded in a Petri net model of the maintenance policy of the farm, allowing to estimate the maintenance costs entailed by several strategies. Advantages and drawbacks of using Petri nets for the modelling of such a maintenance strategy are finally discussed. (authors)

  17. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  18. Paper number: ID 576... Monitoring and maintenance of pumps in LWR

    International Nuclear Information System (INIS)

    Heller, M.; Einzmann, K.

    2001-01-01

    Due to the liberalization of the European Market for electrical power nuclear power plants are progressively subjected to high pressure in respect of reducing the overall costs including for maintenance actions. This concerns also the maintenance of active components as pumps or valves. Siemens Nuclear Power (SNP) has developed a concept for the transition to an integrated condition based maintenance especially for pumps which shall be presented below. It is proposed to make up future decisions on maintenance of pumps only depending on condition data of the component. The concept must be supported by modern monitoring systems, which shall be installed at pumps which are relevant for the safety and availability of the plants. The main technical features of the SNP monitoring system DIROM are presented in detail as an example. First results of acquiring condition related data of a nuclear feed water pump are reported too. The new maintenance concept promises attractive cost benefits in comparison to a former preventive maintenance concept. (author)

  19. The use of condition monitoring information for maintenance planning and decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Rosqvist, T. [VTT Industrial Systems (Finland); Paulsen, J.L. [Risoe National Lab., Roskilde (Denmark)

    2002-12-01

    A survey is presented outlining the use of condition monitoring information in three Nordic nuclear power plants. The questions of the survey relate to the role of condition monitoring in strategic, as well as operative, maintenance planning and decision-making. The survey indicates that condition monitoring is increasingly implemented at nuclear power plants, but very selectively and in a rather slow pace for predictive maintenance. A combined strategy of condition based maintenance and predetermined preventive maintenance is applied for important equipment such as main circulation pumps and steam turbines. A realistic aim is to reduce the number of costly or error prone maintenance and disassembling inspection activities by condition monitoring given that the approach enables a good diagnosis and prediction. Systematic follow-up and analysis of such condition monitoring information followed by a case-specific planning and decision making of timely and rightly directed maintenance actions can justify an extension of the intervals of a number of predetermined inspection, maintenance or periodic testing tasks. (au)

  20. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    International Nuclear Information System (INIS)

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  1. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  2. Forming a cohesive steam generator maintenance strategy

    International Nuclear Information System (INIS)

    Poudroux, G.

    1991-01-01

    In older nuclear plants, steam generator tube bundles are the most fragile part of the reactor coolant system. Steam generator tubes are subject to numerous types of loading, which can lead to severe degradation (corrosion and wear phenomena). Preventive actions, such as reactor coolant temperature reduction or increasing the plugging limit and their associated analyses, can increase steam generator service life. Beyond these preventive actions, the number of affected tubes and the different locations of the degradations that occur often make repair campaigns necessary. Framatome has developed and qualified a wide range of treatment and repair processes. They enable careful management of the repair campaigns, to avoid reaching the maximum steam generator tube plugging limit, while optimizing the costs. Most of the available repair techniques allow a large number of affected tubes to be treated. Here we look only at those techniques that should be taken into account when defining a maintenance strategy. (author)

  3. Attitudes and actions of asthma patients on regular maintenance therapy: the INSPIRE study

    Directory of Open Access Journals (Sweden)

    Myrseth Sven-Erik

    2006-06-01

    Full Text Available Abstract Background This study examined the attitudes and actions of 3415 physician-recruited adults aged ≥ 16 years with asthma in eleven countries who were prescribed regular maintenance therapy with inhaled corticosteroids or inhaled corticosteroids plus long-acting β2-agonists. Methods Structured interviews were conducted to assess medication use, asthma control, and patients' ability to recognise and self-manage worsening asthma. Results Despite being prescribed regular maintenance therapy, 74% of patients used short-acting β2-agonists daily and 51% were classified by the Asthma Control Questionnaire as having uncontrolled asthma. Even patients with well-controlled asthma reported an average of 6 worsenings/year. The mean period from the onset to the peak symptoms of a worsening was 5.1 days. Although most patients recognised the early signs of worsenings, the most common response was to increase short-acting β2-agonist use; inhaled corticosteroids were increased to a lesser extent at the peak of a worsening. Conclusion Previous studies of this nature have also reported considerable patient morbidity, but in those studies approximately three-quarters of patients were not receiving regular maintenance therapy and not all had a physician-confirmed diagnosis of asthma. This study shows that patients with asthma receiving regular maintenance therapy still have high levels of inadequately controlled asthma. The study also shows that patients recognise deteriorating asthma control and adjust their medication during episodes of worsening. However, they often adjust treatment in an inappropriate manner, which represents a window of missed opportunity.

  4. Competence within Maintenance

    OpenAIRE

    Nerland, Annette Smørholm

    2010-01-01

    Maintenance can be a contributing factor to unwanted events, as well as desired events and states. Human competence can be defined as the ability to perform a specific task, action or function successfully, and is therefore a key factor to proper execution of maintenance tasks. Hence,maintenance will have negative consequences if done wrong, and give positive results when done right. The purpose of this report is to study the many aspects of maintenance competence. Endeavoring to improve ...

  5. Maintenance Staffing Standards for Zero-Based Budgeting.

    Science.gov (United States)

    Adams, Matthew C.; And Others

    1998-01-01

    Discusses school preventive maintenance and the variables associated with maintenance staffing standards that address a zero-based budgeting environment. Explores preventive-maintenance measurement for staffing requirements, defines staffing levels and job descriptions, and outlines the factors to consider when creating a maintenance program and…

  6. Improved quality of input data for maintenance optimization using expert judgment

    International Nuclear Information System (INIS)

    Oien, Knut

    1998-01-01

    Most maintenance optimization models need an estimate of the so-called 'naked' failure rate function as input. In practice it is very difficult to estimate the 'naked' failure rate, because overhauls and other preventive maintenance actions tend to 'corrupt' the recorded lifelengths. The purpose of this paper is to stress the importance of utilizing the knowledge of maintenance engineers, i.e., expert judgment, in addition to recorded equipment lifelengths, in order to get credible input data. We have shown that without utilizing expert judgment, the estimated mean time to failure may be strongly biased, often by a factor of 2-3, depending on the life distribution that is assumed. We recommend including a simple question about the mean remaining lifelength on the work-order forms. By this approach the knowledge of maintenance engineers may be incorporated in a simple and cost-effective way

  7. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    Directory of Open Access Journals (Sweden)

    Mihai Florian

    2015-09-01

    Full Text Available Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair and replacement activities as well as large revenue losses, mainly in the case of offshore wind farms. The recent development and evolution of condition monitoring techniques, as well as the fact that an increasing number of installed turbines are equipped with online monitoring systems, offers a large amount of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law approach. The model is used within a risk-based maintenance decision framework to optimize maintenance planning for the blades lifetime.

  8. Preventative maintenance of drainpipes in radioisotope facility using flexible hose

    International Nuclear Information System (INIS)

    Hiroi, Tomoko; Tatsunami, Shinobu; Kuwabara, Rie; Kouyama, Hiroshi; Matsui, Hiroaki; Yamamoto, Takio

    2009-01-01

    A flexible hose made of plasticized polyvinyl chloride was introduced into underground radioactive wastewater drainpipes as preventative maintenance. We completed a seamless connection spanning the longest interval between the last confluence point and the wastewater tank. Although the flexible hose is not a construction material but rather a consumable article, it is robust against the effects of temperature change and erosion by chemical substances. Moreover, it is placed in an underground steel pipe where it is protected from UV irradiation and friction. Therefore, increased hose durability is expected. In addition, the risk of damage from earthquakes or ground subsidence is negligible due to the flexibility of the hose. Compared with a full renovation of the plumbing, the economic cost is much cheaper and the construction period is much shorter. We propose the use of flexible hoses as one of the most convenient methods to prevent leakage accidents at radioisotope facilities with underground plumbing for wastewater. (author)

  9. Preventive maintenance plan of the air-conditioning duct using the ACM-sensor

    International Nuclear Information System (INIS)

    Fukuba, Kazushi; Ito, Takanobu; Kojima, Akiko; Tanji, Kazuhiro; Sato, Yuki

    2013-01-01

    Air-conditioning duct is difficult to predict the date to occur of corrosion such as affect the function. Therefore, the current conservation method is mostly corrective maintenance. Therefore, we used the test pieces of six types and ACM-sensor in order to solve the corrosion speed from corrosion environment and relationship of corrosion quantity of test pieces. In addition, was used the duct molded articles various in order to check the corrosion degree of when processed the duct. As a result, we were selected crust body constituting a duct and optimal combination of the flange by solve the corrosion speed of the test pieces various. Thus, it performs preventive disposal before to occur of corrosion such as affect the function by predicting the duct life from corrosion speed, and lead to stability and safe operating by appropriate maintenance of equipment. (author)

  10. Wind turbine blade life-time assessment model for preventive planning of operation and maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2014-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...... of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O......&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law...

  11. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...... of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O......&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law...

  12. Putting program evaluation to work: a framework for creating actionable knowledge for suicide prevention practice.

    Science.gov (United States)

    Wilkins, Natalie; Thigpen, Sally; Lockman, Jennifer; Mackin, Juliette; Madden, Mary; Perkins, Tamara; Schut, James; Van Regenmorter, Christina; Williams, Lygia; Donovan, John

    2013-06-01

    The economic and human cost of suicidal behavior to individuals, families, communities, and society makes suicide a serious public health concern, both in the US and around the world. As research and evaluation continue to identify strategies that have the potential to reduce or ultimately prevent suicidal behavior, the need for translating these findings into practice grows. The development of actionable knowledge is an emerging process for translating important research and evaluation findings into action to benefit practice settings. In an effort to apply evaluation findings to strengthen suicide prevention practice, the Centers for Disease Control and Prevention (CDC) and the Substance Abuse and Mental Health Services Administration (SAMHSA) supported the development of three actionable knowledge products that make key findings and lessons learned from youth suicide prevention program evaluations accessible and useable for action. This paper describes the actionable knowledge framework (adapted from the knowledge transfer literature), the three products that resulted, and recommendations for further research into this emerging method for translating research and evaluation findings and bridging the knowledge-action gap.

  13. Setting strategy for system change: using concept mapping to prioritise national action for chronic disease prevention.

    Science.gov (United States)

    Wutzke, Sonia; Roberts, Nick; Willis, Cameron; Best, Allan; Wilson, Andrew; Trochim, William

    2017-08-08

    Chronic diseases are a serious and urgent problem, requiring at-scale, multi-component, multi-stakeholder action and cooperation. Despite numerous national frameworks and agenda-setting documents to coordinate prevention efforts, Australia, like many countries internationally, is yet to substantively impact the burden from chronic disease. Improved evidence on effective strategies for the prevention of chronic disease is required. This research sought to articulate a priority set of important and feasible action domains to inform future discussion and debate regarding priority areas for chronic disease prevention policy and strategy. Using concept mapping, a mixed-methods approach to making use of the best available tacit knowledge of recognised, diverse and well-experienced actors, and national actions to improve the prevention of chronic disease in Australia were identified and then mapped. Participants (ranging from 58 to 78 in the various stages of the research) included a national sample of academics, policymakers and practitioners. Data collection involved the generation and sorting of statements by participants. A series of visual representations of the data were then developed. A total of 95 statements were distilled into 12 clusters for action, namely Inter-Sectoral Partnerships; Systems Perspective/Action; Governance; Roles and Responsibilities; Evidence, Feedback and Learning; Funding and Incentive; Creating Demand; Primary Prevention; Social Determinants and Equity; Healthy Environments; Food and Nutrition; and Regulation and Policy. Specific areas for more immediate national action included refocusing the health system to prevention over cure, raising the profile of public health with health decision-makers, funding policy- and practice-relevant research, improving communication about prevention, learning from both global best-practice and domestic successes and failures, increasing the focus on primary prevention, and developing a long-term prevention

  14. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  15. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  16. Preventative maintenance cycle of contact switches for nuclear power plants based on lifetime assessment and economic analysis

    International Nuclear Information System (INIS)

    Shi Jie

    2010-01-01

    An approach to determine the preventive maintenance cycle was proposed in consideration of the lifetime, optimal cost and economy. Two parameters Weibull distribution was used to calculate the lifetime of contact switch. The block replacement model and age replacement model were built with the objective of optimal cost, and the preventive replacement cycle was accounted. Eight proposals for preventive replacement cycle were given. Economy model was applied to assess those proposals and the optimal proposal was confirmed. (authors)

  17. On line system monitoring and analysis for efficient maintenance management [Paper No.: I-10

    International Nuclear Information System (INIS)

    Verma, R.M.P.

    1981-01-01

    Continuously operating chemical plants and nuclear reactors with huge investments cannot afford unscheduled shut down, costly down time, undesired exposure of people to radiation and high cost of inventory. To obtain cost effectiveness in terms of increased plant availability with increased quality, safety and reliability of plant operations a good maintenance system is required. A preventive maintenance programme, though successful to a greater extent, has got the limitations of being based upon elapsed time, subjective approach or statistical data. Hence, maintenance action is mistimed. Preventive maintenance can become very effective if rational and scientific data on equipment under working conditions are available. It can be achieved through on-line predictive instruments like sound level and vibration analyzers, probologs, corrosmeters, strain gages, thermographic infrared sensors, on-line ferrographs, chromatographs, acoustic emission, eddy current ultrasonic and wireless sensors etc. Instruments help maintenance engineer to diagnose, inspect, monitor, and help in forecasting failures and scheduling the frequencies optimally for overhauls, replacements, lubrication etc. They are also helpful in establishing work load, manpower, resource planning and inventory control. This paper discusses real time computer based system as well as conventional instruments and techniques. (author)

  18. Numerical study of inventory management under various maintenance policies

    NARCIS (Netherlands)

    Poppe, J.; Basten, R.J.I.; Boute, R.N.; Lambrecht, M.R.

    2017-01-01

    Capital assets, such as manufacturing equipment, require maintenance to remain functioning. Maintenance can be performed when a component breaks down and needs replacement (i.e., corrective maintenance), or the maintenance and part replacement can be performed preventively. Preventive maintenance

  19. A computerized event and maintenance data system at Loviisa nuclear power plant

    International Nuclear Information System (INIS)

    Jankala, K.E.; Saarelainen, P.; Vaurio, J.K.

    1993-01-01

    An on-line failure and maintenance event data system (which is a part of the Loviisa power plant information system) is described as developed and implemented at the Loviisa power plant. The system has been in operation since 1989, and the data base now covers more than 10 years of operation. The system contains a complete unavailability history, i.e. failures, repairs, replacements, scheduled or unscheduled preventive maintenance and periodic testing or service actions for any component that is relevant to plant safety, risk or economic production. The data base provides useful feedback from operating experience and can support e.g. studies on optimal maintenance and testing, planning of spare parts inventory and repair resources, updating of reliability parameters for risk studies, etc. (Z.S.) 4 refs

  20. MPGV: An expert system for the preventive maintenance of the vapor generators in a PWR type reactor

    International Nuclear Information System (INIS)

    Castelanu, L.

    1990-01-01

    The characteristics and the architecture of the expert system designed for assisting the preventive maintenance of vapor generators are described. The main objectives of the system are: to optimize the inspection plans, to assess breakdown risks, to propose solutions and to organize maintenance operations. The expert system allows the accurate evaluation of risks concerning the development of an application. However, the experience demonstrates that a cost-benefit analysis not accurate enough induces errors in the expert system applications [fr

  1. JIT single machine scheduling problem with periodic preventive maintenance

    Science.gov (United States)

    Shahriari, Mohammadreza; Shoja, Naghi; Zade, Amir Ebrahimi; Barak, Sasan; Sharifi, Mani

    2016-09-01

    This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms.

  2. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  3. Maintenance technologies for reactor internals

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Kenji [Nuclear Energy Systems and Services Div., Toshiba Corp., Tokyo (Japan); Kobayashi, Masahiro [Toshiba Corp., Yokohama (Japan). Keihin Product Operations; Sano, Yuji; Kimura, Seiichiro [Power and Industrial Systems Research and Development Center, Toshiba Corp., Tokyo(Japan)

    2000-10-01

    Toshiba places the highest priority on maintenance technologies for the reactor pressure vessel (RPV) and its internals in operating nuclear power plants. This paper summarizes the status of applied laser maintenance technologies, both preventive and repair. For laser peeing and laser desensitization treatment (LDT) technologies in particular, field applications are also described in detail. In the future, the area of field applications for preventive maintenance, repair, and inspection technologies will be further expanded. (author)

  4. Using the intervention mapping protocol to develop a maintenance programme for the SLIMMER diabetes prevention intervention.

    Science.gov (United States)

    Elsman, Ellen B M; Leerlooijer, Joanne N; Ter Beek, Josien; Duijzer, Geerke; Jansen, Sophia C; Hiddink, Gerrit J; Feskens, Edith J M; Haveman-Nies, Annemien

    2014-10-27

    Although lifestyle interventions have shown to be effective in reducing the risk for type 2 diabetes mellitus, maintenance of achieved results is difficult, as participants often experience relapse after the intervention has ended. This paper describes the systematic development of a maintenance programme for the extensive SLIMMER intervention, an existing diabetes prevention intervention for high-risk individuals, implemented in a real-life setting in the Netherlands. The maintenance programme was developed using the Intervention Mapping protocol. Programme development was informed by a literature study supplemented by various focus group discussions and feedback from implementers of the extensive SLIMMER intervention. The maintenance programme was designed to sustain a healthy diet and physical activity pattern by targeting knowledge, attitudes, subjective norms and perceived behavioural control of the SLIMMER participants. Practical applications were clustered into nine programme components, including sports clinics at local sports clubs, a concluding meeting with the physiotherapist and dietician, and a return session with the physiotherapist, dietician and physical activity group. Manuals were developed for the implementers and included a detailed time table and step-by-step instructions on how to implement the maintenance programme. The Intervention Mapping protocol provided a useful framework to systematically plan a maintenance programme for the extensive SLIMMER intervention. The study showed that planning a maintenance programme can build on existing implementation structures of the extensive programme. Future research is needed to determine to what extent the maintenance programme contributes to sustained effects in participants of lifestyle interventions.

  5. Predictive maintenance strategy in the graphics departament of a tobacco company

    Directory of Open Access Journals (Sweden)

    Guilherme Francez Toazza

    2015-09-01

    Full Text Available The purpose of this article was to describe the implementation of a strategy for Predictive Maintenance in the graphics department of the company Souza Cruz SA after the techniques of Vibration Analysis, Thermography, Ferrography and Inspection Sensitive. The research method was the action-research. The proposed study is the application of a management Predictive Maintenance acting strategically within the context in which it is embedded. The article reviews the theoretical concepts and Predictive Maintenance techniques mentioned above. In the survey, were raised in the information system of the company, the rate of breakdown of equipment (downtime, waste energy costs, maintenance costs and availability of H / h (man / hour and availability of equipment for the production the period prior to the implementation of a predictive maintenance management and consistent compared with results after this deployment. From the results obtained, it was evident that only preventive maintenance, combined with a model predictive maintenance is not poor enough to maintain the desired reliability in a department of great importance to your company. So, it is possible to say that the implementation of a predictive maintenance strategy can make the Maintenance sector to work strategically with common goals to the company as a whole.

  6. An overview of a knowledge based system for preventive maintenance support of nuclear power plants

    International Nuclear Information System (INIS)

    Terano, Takao; Nishiyama, Takuya; Yokoo, Takeshi

    1984-01-01

    In recent years, much interest has been paid to knowledge engineering techniques for new vehicles of advanced information processing. As a practical application in electric power industry, this report discusses a knowledge based system for supporting preventive maintenance of nuclear power plants. To support preventive maintenance tasks, the system must have facilities to reason failures and accidents of the plants, to evaluate their significance, to predict any possible troubles, and to indentify appropriate preventive countermeasures for them. This report describes the overview of the prototype system from a viewpoint of knowledge engineering. The results of the study are as follows: (1) The knowledge base of the prototype system consists of a data-base on plants and a rule-base derived from experts' knowledge. Using the information in the knowledge base, the system diagnoses the plant without real-time interaction with operational plants. (2) Expert's knowledge in the rule-base is represented in the non-procedural declarative forms. These rules are organized in some hierarchical structure so as to be used efficiently and used in conjunction with the corresponding set of plant information in the data-base. (3) The prototype system is incrementally developed with the rapid prototyping techniques, that is, the processes of design, implementation and evaluation are repeated several times. (author)

  7. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  8. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  9. Determining optimal preventive maintenance interval for component of Well Barrier Element in an Oil & Gas Company

    Science.gov (United States)

    Siswanto, A.; Kurniati, N.

    2018-04-01

    An oil and gas company has 2,268 oil and gas wells. Well Barrier Element (WBE) is installed in a well to protect human, prevent asset damage and minimize harm to the environment. The primary WBE component is Surface Controlled Subsurface Safety Valve (SCSSV). The secondary WBE component is Christmas Tree Valves that consist of four valves i.e. Lower Master Valve (LMV), Upper Master Valve (UMV), Swab Valve (SV) and Wing Valve (WV). Current practice on WBE Preventive Maintenance (PM) program is conducted by considering the suggested schedule as stated on manual. Corrective Maintenance (CM) program is conducted when the component fails unexpectedly. Both PM and CM need cost and may cause production loss. This paper attempts to analyze the failure data and reliability based on historical data. Optimal PM interval is determined in order to minimize the total cost of maintenance per unit time. The optimal PM interval for SCSSV is 730 days, LMV is 985 days, UMV is 910 days, SV is 900 days and WV is 780 days. In average of all components, the cost reduction by implementing the suggested interval is 52%, while the reliability is improved by 4% and the availability is increased by 5%.

  10. School Administrator Perceptions of Cyberbullying Facilitators and Barriers to Preventive Action: A Qualitative Study.

    Science.gov (United States)

    Young, Rachel; Tully, Melissa; Ramirez, Marizen

    2017-06-01

    Schools are often held responsible for preventing or addressing cyberbullying, yet little is known about school administrator perceptions of cyberbullying and the challenges they face in addressing this public health issue. The goal of this study is to examine school administrators' perceptions of the facilitators of cyberbullying and barriers to primary and secondary prevention strategies. Public school administrators ( N = 36) participated in in-depth interviews about bullying and discussed their experiences with cyberbullying and their perceptions of cyberbullying facilitators and barriers to prevention. Three main themes arose from the analysis: (1) cyberbullying as a major challenge; (2) facilitators of cyberbullying and barriers to preventive action, including parents and technology; and (3) prevention efforts, including unclear jurisdiction for action, primary versus secondary prevention efforts, and technology attributes that facilitate school response to bullying. Although administrators perceive cyberbullying as a major challenge facing their schools, they are often unsure about appropriate primary and secondary prevention efforts. Relationships with parents and police complicate response and prevention as schools attempt to navigate unclear jurisdiction. Additionally, technology presents a challenge to schools because it is seen as an enabler of cyberbullying, a facilitator of prevention, and a necessary part of education efforts. Lack of research on prevention strategies, parents' knowledge and attitudes, and confusion about responsibility for addressing cyberbullying are barriers to action. Findings suggest administrators could benefit from additional clarity on which strategies are most effective for primary prevention of cyberbullying, and that prevention strategies should proactively involve parents to promote effective collaboration with schools.

  11. Institutional Diversity in Collective Action: Investigating Successful Village Level Maintenance of Hand Pumps in Malawi

    Science.gov (United States)

    Joubert, Brian Anthony

    Providing clean water to rural communities in sub-Saharan Africa remains a challenge. Unsanitary and distant water sources cause a host of health and humanitarian problems. A common means of remedying this situation has been the donation of improved water sources, fitted with low-cost hand pumps. Due donor capacity and/ or policy most hand pumps are donated under the guise of Village Level Operation and Maintenance (VLOM). This premises the notion that recipient communities will take ownership of the new pump and as such will ensure its maintenance. To assist with this many donors carry out programs of technical repair training and the structuring of in-village leadership and management groups. The reality is that a high proportion of these pumps break down after donation and cease to work thereafter. Measures to redress technical elements of these failures through increased training or adequate distribution of spares has seen some success but failure rates remains high. This has led to a call for more attention to demand side issues, focusing on the communal aspects that may influence a village to act collectively in the maintenance of its hand pump. This thesis researched five Malawian villages where the community had maintained their hand pumps for a period of 10 or more years. These hand pumps were treated as shared resources and the literature on common-pool resources and social institutions was used as a theoretical framework. Applying these theories proved to be appropriate for analyzing the norms, conventions and forms of cooperative conduct. This allowed the research to gain insights into institutional diversity and the relationship between 'formal institutions', most often exogenous in nature, and informal' or customary collective action institutions embedded within the communities. Findings showed the emergence of three predominant themes within these successful case studies: 1) the role of leadership at varying levels and how it is embodied

  12. Maintenance of systemic immune functions prevents accelerated presbycusis.

    Science.gov (United States)

    Iwai, Hiroshi; Baba, Susumu; Omae, Mariko; Lee, Shinryu; Yamashita, Toshio; Ikehara, Susumu

    2008-05-07

    There is no effective therapy for progressive hearing loss such as presbycusis, the causes of which remain poorly understood because of the difficulty of separating genetic and environmental contributions. In the present study, we show that the age-related dysfunctions of the systemic immune system in an animal model of accelerated presbycusis (SAMP1, senescence-accelerated mouse P1) can be corrected by allogeneic bone marrow transplantation (BMT). We also demonstrate that this presbycusis can be prevented; BMT protects the recipients from age-related hearing impairment and the degeneration of spiral ganglion cells (SGCs) as well as the dysfunctions of T lymphocytes, which have a close relation to immune senescence. No donor cells are infiltrated to the spiral ganglia, confirming that this experimental system using BMT is connected to the systemic immune system and does not contribute to transdifferentiation or fusion by donor hematopoietic stem cells (HSCs), or to the direct maintenance of ganglion cells by locally infiltrated donor immunocompetent cells. Therefore, another procedure which attempts to prevent the age-related dysfunctions of the recipient immune system is the inoculation of syngeneic splenocytes from young donors. These mice show no development of hearing loss, compared with the recipient mice with inoculation of saline or splenocytes from old donors. Our studies on the relationship between age-related systemic immune dysfunctions and neurodegeneration mechanisms open up new avenues of treatment for presbycusis, for which there is no effective therapy.

  13. A probabilistic maintenance model for diesel engines

    Science.gov (United States)

    Pathirana, Shan; Abeygunawardane, Saranga Kumudu

    2018-02-01

    In this paper, a probabilistic maintenance model is developed for inspection based preventive maintenance of diesel engines based on the practical model concepts discussed in the literature. Developed model is solved using real data obtained from inspection and maintenance histories of diesel engines and experts' views. Reliability indices and costs were calculated for the present maintenance policy of diesel engines. A sensitivity analysis is conducted to observe the effect of inspection based preventive maintenance on the life cycle cost of diesel engines.

  14. Reusable rocket engine preventive maintenance scheduling using genetic algorithm

    International Nuclear Information System (INIS)

    Chen, Tao; Li, Jiawen; Jin, Ping; Cai, Guobiao

    2013-01-01

    This paper deals with the preventive maintenance (PM) scheduling problem of reusable rocket engine (RRE), which is different from the ordinary repairable systems, by genetic algorithm. Three types of PM activities for RRE are considered and modeled by introducing the concept of effective age. The impacts of PM on all subsystems' aging processes are evaluated based on improvement factor model. Then the reliability of engine is formulated by considering the accumulated time effect. After that, optimization model subjected to reliability constraint is developed for RRE PM scheduling at fixed interval. The optimal PM combination is obtained by minimizing the total cost in the whole life cycle for a supposed engine. Numerical investigations indicate that the subsystem's intrinsic reliability characteristic and the improvement factor of maintain operations are the most important parameters in RRE's PM scheduling management

  15. An Optimal Number-Dependent Preventive Maintenance Strategy for Offshore Wind Turbine Blades Considering Logistics

    Directory of Open Access Journals (Sweden)

    Mahmood Shafiee

    2013-01-01

    Full Text Available In offshore wind turbines, the blades are among the most critical and expensive components that suffer from different types of damage due to the harsh maritime environment and high load. The blade damages can be categorized into two types: the minor damage, which only causes a loss in wind capture without resulting in any turbine stoppage, and the major (catastrophic damage, which stops the wind turbine and can only be corrected by replacement. In this paper, we propose an optimal number-dependent preventive maintenance (NDPM strategy, in which a maintenance team is transported with an ordinary or expedited lead time to the offshore platform at the occurrence of the Nth minor damage or the first major damage, whichever comes first. The long-run expected cost of the maintenance strategy is derived, and the necessary conditions for an optimal solution are obtained. Finally, the proposed model is tested on real data collected from an offshore wind farm database. Also, a sensitivity analysis is conducted in order to evaluate the effect of changes in the model parameters on the optimal solution.

  16. Investigating the causes of human error-induced incidents in the maintenance operations of petrochemical industry by using HFACS

    Directory of Open Access Journals (Sweden)

    Mohammadreza Azhdari

    2017-03-01

    Full Text Available Background & Objectives: Maintenance is an important tool for the petrochemical industries to prevent of accidents and increase operational and process safety success. The purpose of this study was to identify the possible causes of incidents caused by human error in the petrochemical maintenance activities by using Human Factors Analysis and Classification System (HFACS. Methods: This study is a cross-sectional analysis that was conducted in Zagros Petrochemical Company, Asaluyeh-Iran. A checklist of human error-induced incidents was developed based on four HFACS main levels and nineteen sub-groups. Hierarchical task analysis (HTA technique was used to identify maintenance activities and tasks. The main causes of possible incidents were identified by checklist and recorded. Corrective and preventive actions were defined depending on priority.   Results: The content analysis of worksheets of 444 activities showed 37.6% of the causes at the level of unsafe actions, 27.5% at the level of unsafe supervision, 20.9% at the level of preconditions for unsafe acts and 14% of the causes at the level of organizational effects. The HFACS sub-groups showed errors (24.36% inadequate supervision (14.89% and violations (13.26% with the most frequency. Conclusion: In order to prevent and reduce the occurrence of the identified errors, reducing the rate of the detected errors is crucial. Findings of this study showed that appropriate controlling measures such as periodical training of work procedures and supervision improvement decrease the human error-induced incidents in petrochemical industry maintenance.

  17. Analysis of maintenance strategies

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.

    1998-01-01

    The main topics of the presentation include: (1) an analysis model and methods to evaluate maintenance action programs and the support decision to make changes in them and (2) to understand the maintenance strategies in a systems perspective as a basis for future developments. The subproject showed how systematic models for maintenance analysis and decision support, utilising computerised and statistical tool packages, can be taken into use for evaluation and optimisation of maintenance of active systems from the safety and economic point of view

  18. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  19. Component-Based Data-Driven Predictive Maintenance to Reduce Unscheduled Maintenance Events

    NARCIS (Netherlands)

    Verhagen, W.J.C.; Curran, R.; de Boer, L.W.M.; Chen, C.H.; Trappey, A.C.; Peruzzini, M.; Stjepandić, J.; Wognum, N.

    2017-01-01

    Costs associated with unscheduled and preventive maintenance can contribute significantly to an airline's expenditure. Reliability analysis can help to identify and plan for maintenance events. Reliability analysis in industry is often limited to statistically based

  20. Incidence of falls and preventive actions in a University Hospital.

    Science.gov (United States)

    Luzia, Melissa de Freitas; Cassola, Talita Portela; Suzuki, Lyliam Midori; Dias, Vera Lucia Mendes; Pinho, Leandro Barbosa de; Lucena, Amália de Fátima

    2018-01-01

    Objective Describing the incidence of falls and its relation with preventive actions developed in a Brazilian university hospital. Method A retrospective longitudinal study. Hospitalized adult patients in the clinical, surgical, psychiatric and emergency units who suffered a fall in the institution, and who had the event notified in the period from January 2011 to December 2015 were included in the study. The data were collected from the institution's management information system and analyzed in the SPSS statistical program. Results There were 2,296 falls, with a mean incidence of 1.70 falls/1,000 patients per day. An increase in the incidence of falls was observed in the period from 2011 (1.61) to 2012 (2.03). In the following years, the incidence of falls decreased from 1.83 falls/1,000 patients per day in 2013 to 1.42 falls/1,000 patients per day in 2015. The incidence of falls accompanied an implementation of preventive actions, suggesting the impact of such interventions in reducing the event occurrence. Conclusion The findings demonstrate the importance of implementing preventive interventions in reducing the incidence of falls in hospitalized patients.

  1. NCI Statement on the U.S. Surgeon General's "Call to Action to Prevent Skin Cancer"

    Science.gov (United States)

    As the Federal Government's principal agency for cancer research and training, the National Cancer Institute (NCI) endorses the U.S. Surgeon General’s “Call to Action to Prevent Skin Cancer,” which provides a comprehensive evaluation of the current state of skin cancer prevention efforts in the United States and recommends actions for improvement in the future.

  2. 14 CFR 125.407 - Maintenance log: Airplanes.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance log: Airplanes. 125.407 Section... OPERATIONS: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE PASSENGERS OR A MAXIMUM PAYLOAD CAPACITY OF 6... Maintenance log: Airplanes. (a) Each person who takes corrective action or defers action concerning a reported...

  3. Study on the methodology for predicting and preventing errors to improve reliability of maintenance task in nuclear power plant

    International Nuclear Information System (INIS)

    Hanafusa, Hidemitsu; Iwaki, Toshio; Embrey, D.

    2000-01-01

    The objective of this study was to develop and effective methodology for predicting and preventing errors in nuclear power plant maintenance tasks. A method was established by which chief maintenance personnel can predict and reduce errors when reviewing the maintenance procedures and while referring to maintenance supporting systems and methods in other industries including aviation and chemical plant industries. The method involves the following seven steps: 1. Identification of maintenance tasks. 2. Specification of important tasks affecting safety. 3. Assessment of human errors occurring during important tasks. 4. Identification of Performance Degrading Factors. 5. Dividing important tasks into sub-tasks. 6. Extraction of errors using Predictive Human Error Analysis (PHEA). 7. Development of strategies for reducing errors and for recovering from errors. By way of a trial, this method was applied to the pump maintenance procedure in nuclear power plants. This method is believed to be capable of identifying the expected errors in important tasks and supporting the development of error reduction measures. By applying this method, the number of accidents resulting form human errors during maintenance can be reduced. Moreover, the maintenance support base using computers was developed. (author)

  4. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  5. Effectiveness and cost-effectiveness of mindfulness-based cognitive therapy compared with maintenance antidepressant treatment in the prevention of depressive relapse or recurrence (PREVENT): a randomised controlled trial.

    Science.gov (United States)

    Kuyken, Willem; Hayes, Rachel; Barrett, Barbara; Byng, Richard; Dalgleish, Tim; Kessler, David; Lewis, Glyn; Watkins, Edward; Brejcha, Claire; Cardy, Jessica; Causley, Aaron; Cowderoy, Suzanne; Evans, Alison; Gradinger, Felix; Kaur, Surinder; Lanham, Paul; Morant, Nicola; Richards, Jonathan; Shah, Pooja; Sutton, Harry; Vicary, Rachael; Weaver, Alice; Wilks, Jenny; Williams, Matthew; Taylor, Rod S; Byford, Sarah

    2015-07-04

    Individuals with a history of recurrent depression have a high risk of repeated depressive relapse or recurrence. Maintenance antidepressants for at least 2 years is the current recommended treatment, but many individuals are interested in alternatives to medication. Mindfulness-based cognitive therapy (MBCT) has been shown to reduce risk of relapse or recurrence compared with usual care, but has not yet been compared with maintenance antidepressant treatment in a definitive trial. We aimed to see whether MBCT with support to taper or discontinue antidepressant treatment (MBCT-TS) was superior to maintenance antidepressants for prevention of depressive relapse or recurrence over 24 months. In this single-blind, parallel, group randomised controlled trial (PREVENT), we recruited adult patients with three or more previous major depressive episodes and on a therapeutic dose of maintenance antidepressants, from primary care general practices in urban and rural settings in the UK. Participants were randomly assigned to either MBCT-TS or maintenance antidepressants (in a 1:1 ratio) with a computer-generated random number sequence with stratification by centre and symptomatic status. Participants were aware of treatment allocation and research assessors were masked to treatment allocation. The primary outcome was time to relapse or recurrence of depression, with patients followed up at five separate intervals during the 24-month study period. The primary analysis was based on the principle of intention to treat. The trial is registered with Current Controlled Trials, ISRCTN26666654. Between March 23, 2010, and Oct 21, 2011, we assessed 2188 participants for eligibility and recruited 424 patients from 95 general practices. 212 patients were randomly assigned to MBCT-TS and 212 to maintenance antidepressants. The time to relapse or recurrence of depression did not differ between MBCT-TS and maintenance antidepressants over 24 months (hazard ratio 0·89, 95% CI 0·67-1·18

  6. Maintenance of radiation monitoring systems

    International Nuclear Information System (INIS)

    Aoyama, Kei

    2001-01-01

    As the safety and quality of atomic power facilities are more strongly required, the reliability improvement and preventive maintenance of radiation monitoring systems are important. This paper describes the maintenance of radiation monitoring systems delivered by Fuji Electric and the present status of preventive maintenance technology. Also it introduces the case that we developed a fault diagnosis function adopting a statistics technique and artificial intelligence (AI) and delivered a radiation monitoring system including this function. This system can output a fault analysis result and a countermeasure from the computer in real time. (author)

  7. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  8. Shareholder‘s derivate action: "ex lege" measures to prevent shareholder’s abuse

    OpenAIRE

    Mikalonienė, Lina

    2015-01-01

    This article is the second article on the topic related to the shareholder‘s derivate action. After evaluating the key general aspects of the shareholder’s derivate action (e.g. concept, rationale and goals) with respect to the Lithuanian Corporate Law, this article analyzes some ex lege protective measures to prevent shareholder’s abuse in bringing shareholder‘s derivate action as well as evaluates need to revise the related Lithuanian legislation. The focus of the article is, first, on spec...

  9. Dutch monitor on stress and physical load: risk factors, consequences, and preventive action.

    Science.gov (United States)

    Houtman, I L; Goudswaard, A; Dhondt, S; van der Grinten, M P; Hildebrandt, V H; van der Poel, E G

    1998-02-01

    Due to recent changes in legislation on occupational health and safety, a national monitor on stress and physical load was developed in The Netherlands to monitor (a) risks and consequences of stress and physical load at work, (b) preventive actions in companies to reduce these risks, and (c) organisational and environmental variables that facilitate preventive actions. Information was gathered from employers, employees, and employees' representatives. The monitor was used with a nationally representative sample of companies in industry, wholesale trade, and banking and finance, 782 companies in total. The information from the employees, aggregated at the company level, was not found to be correlated with that from the employer from the same companies. Although many employers do recognise risk factors for both physical load and stress as a problem they often seem to underestimate the problem when compared with employees or their representatives. This is particularly the case for psychosocial risk factors. Also, the perception of outcome measures, especially employers who consider emotional exhaustion to be work related, were fewer than the employees' representatives of the same organisation. Preventive measures on physical load are much more popular than measures against stress. It is the responsibility of the employer to take more preventive action of all kinds. They need to recognise risk factors as problems and health outcomes to be related to work. Employees of larger companies should participate with employers to consider effective measures, and more use should be made of support at branch level. For specific preventive measures, specific predictors emerged. Except for measures to prevent work stress, information from employees did not sufficiently contribute to the initiation of preventive measures in the workplace.

  10. A Biochemical Approach to Understanding the Fanconi Anemia Pathway-Regulated Nucleases in Genome Maintenance for Preventing Bone Marrow Failure and Cancer

    Science.gov (United States)

    2014-04-01

    the Fanconi Anemia Pathway- Regulated Nucleases in Genome Maintenance for Preventing Bone Marrow Failure and Cancer PRINCIPAL INVESTIGATOR...GRANT NUMBER 4. TITLE AND SUBTITLE A Biochemical Approach to Understanding the Fanconi Anemia Pathway-Regulated Nucleases in Genome Maintenance for...Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT Fanconi anemia is the most prevalent inherited BMF syndromes, caused by mutations in

  11. Jointly Production and Correlated Maintenance Optimization for Parallel Leased Machines

    Directory of Open Access Journals (Sweden)

    Tarek ASKRI

    2017-04-01

    Full Text Available This paper deals with a preventive maintenance strategy optimization correlated to production for a manufacturing system made by several parallel machines under lease contract. In order to minimize the total cost of production and maintenance by reducing the production system interruptions due to maintenance activities, a correlated group preventive maintenance policy is developed using the gravity center approach (GCA. The aim of this study is to determine an economical production plan and an optimal group preventive maintenance interval Tn at which all machines are maintained simultaneously. An analytical correlation between failure rate of machines and production level is considered and the impact of the preventive maintenance policy on the production plan is studied. Finally, the proposed maintenance policy GPM is compared with an individual simple strategy approach IPM in order to illustrate its efficiency.

  12. Waste minimization, recycling and reuse in operations support services fleet maintenance

    International Nuclear Information System (INIS)

    Trego, A.L.

    1994-01-01

    Government regulations and smart business practices demand that organizations dramatically reduce both the type and volume of waste generated by their operations. This article describes successful waste minimization and recycling programs created by the Fleet Maintenance, Operations Support Services Division, Westinghouse Hanford Company. These comprehensive programs have greatly reduced waste formerly produced in maintaining 3,528 government-owned vehicles and nearly 200 emergency power generators at the Hanford Site. The actions are integral to preventing future contamination of the Site as well as to cleaning up the complexity of wastes from almost 50 years of defense production. The results of the Fleet Maintenance programs are impressive, recording cost savings of $290,000 in fiscal year 1993 and $965,000 since 1988

  13. Are green building features safe for preventive maintenance workers? Examining the evidence.

    Science.gov (United States)

    Omar, Mohamed Shamun; Quinn, Margaret M; Buchholz, Bryan; Geiser, Ken

    2013-04-01

    Many newly constructed green buildings (GB) are certified using the United States Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) rating system for new construction and major renovation which focuses on architectural and mechanical design to conserve energy, reduce environmental harm, and enhance indoor quality for occupants. This study evaluated the preventive maintenance (PM) worker occupational safety and health (OSH) risks related to the design of GB. PM job hazard analyses (JHA) were performed on the tasks required to operate and maintain five GB features selected from 13 LEED certified GB. A 22-item JHA and OSH risk scoring system were developed. Potentially serious OSH hazards included: green roofs made of slippery material without fall protection; energy recovery wheels and storm water harvesting systems in confined spaces; skylights without guard rails; and tight geothermal well mechanical rooms constraining safe preventive practices. GB can present PM OSH risks and these should be eliminated in the building design phase. Copyright © 2013 Wiley Periodicals, Inc.

  14. 30 CFR 49.6 - Equipment and maintenance requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Equipment and maintenance requirements. 49.6... TRAINING MINE RESCUE TEAMS § 49.6 Equipment and maintenance requirements. (a) Each mine rescue station... indicates that a corrective action is necessary, the corrective action shall be made and the person shall...

  15. Six Sigma methodology as a road to intelligent maintenance

    Directory of Open Access Journals (Sweden)

    Michał Zasadzień

    2017-06-01

    Full Text Available An enterprise which is managed in a modern way should be based on the concept of knowledge management. It is particularly important in the case of processes related to facility maintenance, where the efficiency and effectiveness of work is directly connected with the employees’ knowledge. Improvement of processes involved in facility maintenance has a real influence on the productivity of a manufacturing enterprise. High accessibility of technical equipment and its correct functioning influence not only production efficiency but also the quality of products and the safety of operators. The article is a description of an attempt to implement one of quality engineering methods for improving the facility maintenance process. The author decided to use the 8D method to shorten the duration of downtimes caused by breakdowns. Owing to the conducted analysis and the implementation of the improvement and preventive actions, we were able to shorten the duration of a downtime of a machine having a crucial importance for the company. Investigations and implementation were conducted in one of Silesian production plants.

  16. Laser application maintenance technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Shima, Seishi; Sato, Kenji; Kobayashi, Masahiro; Sano, Yuji; Kimura, Seiichiro

    2000-01-01

    Several plants that were the first to be constructed in Japan have been operating for more than 20 years now, and preventive maintenance is therefore a matter of great importance. This paper summarizes the status of applied laser maintenance technologies both preventive and repair. Especially for the laser peening and laser de-sensitization treatment technology, field applications were also described in detail. In future, expansion of field application area on the preventive maintenance, repair and inspection technologies will be developed. (author)

  17. Maintenance optimization for subsea oil pipelines

    International Nuclear Information System (INIS)

    Castanier, Bruno; Rausand, Marvin

    2006-01-01

    In this paper, the classical PF interval model, proposed for reliability centered maintenance, is used to optimize the preventive replacement policy of a subsea oil pipeline. The pipeline is subject to failure modes that may lead to oil release and pollution of the sea. The proposed replacement policy is based on regular condition measurements of the quality of an internal pipeline coating (lining). Holes in the coating will expose the pipe material (steel) to a corrosive environment. It is, therefore, important to identify holes in the coating and take action before the corrosion penetrates the pipe wall. The model proposed in the paper can be used to determine the inspection interval that minimizes the average maintenance cost per time unit. The model formulation is outlined and illustrative examples are solved. The mathematical evaluation of the replacement policy requires numerous assumptions. These assumptions have to be tailored to the specific application. The assumptions and the data provided are included for illustrative purposes to exemplify potential results that may be obtained by using the replacement policy

  18. Using participatory action research for injury prevention in child development centers, Suratthani province

    Directory of Open Access Journals (Sweden)

    Naturthai Suwantip

    2018-01-01

    Full Text Available This study investigated the effects of using participatory action research (PAR in the prevention of injury to children in 14 child development centers (CDCs under local administrative organizations in one district in Suratthani province, Thailand. In total, 98 stakeholder representatives participated in the study, consisting of 7 managers or representatives of the CDCs, 14 caregivers, 7 local health officials and 70 children's parents. They participated in all stages of the study—problem identification, setting the objectives and goals of the study, planning the study, development of research tools, data collection, risk analysis, risk management, monitoring, evaluation, and revision. The physical environments that were in non-compliance with safety standards were identified after a walk-through survey with the participants using an approved checklist. The number of injuries to children was collected before and after the risk management. The participants' knowledge and awareness of child injury prevention were collected using questionnaires. Optimal solutions for injury prevention were obtained through several focus group discussions between the participants within each CDC and among the CDCs. Active participation of the stakeholders resulted in significantly more knowledge and awareness relating to child injury prevention. The environments of CDCs in compliance with safety standards were significantly increased. The number of injuries to the children decreased. The participatory action model in this research was developed through collaboration between the 14 CDCs. The executives of local administrative organizations and local health officials can take the model used in this study and apply it to injury prevention in other CDCs which have a similar environment across the province. Keywords: child development center, injury prevention, participatory action research

  19. Operations and maintenance manual for the temporary septic holding tank at the 300-FF-1 Remedial Action Support Facility

    International Nuclear Information System (INIS)

    Gilkeson, D.E.; Jackson, G.J.

    1997-02-01

    This document provides detailed information regarding the operations and maintenance of the septic holding tank system at the 300-FF-1 Remedial Action Support Facility, located in the 300 Area. This document includes the type and frequency of requirement maintenance, failure response procedures, and reporting requirements. Sanitary wastewater and raw sewage will enter the holding tank via a sloped 102 mm polyvinyl chloride (PVC) line from the office trailers. The septic holding tank will be emptied, as required, by system demands. During normal usage, it is estimated that the tank will require pumping every 3 working days. Approximately 834 gallons of sanitary wastewater and raw sewage will be disposed of into the septic system during this time

  20. Collaborative learning in condition based maintenance

    NARCIS (Netherlands)

    Koochaki, J.; Ao, SI; Gelman, L; Hukins, DWL; Hunter, A; Korsunsky, AM

    2009-01-01

    In recent years, the importance of reliable and consistent production equipments has increased. As a result, companies are shifting their maintenance policy from preventive maintenance towards Condition Based Maintenance (CBM). Despite the growing trend in this area and success stories of CBM

  1. A condition-based maintenance policy with non-periodic inspections for a two-unit series system

    International Nuclear Information System (INIS)

    Castanier, B.; Grall, A.; Berenguer, C.

    2005-01-01

    This paper considers a condition-based maintenance policy for a two-unit deteriorating system. Each unit is subject to gradual deterioration and is monitored by sequential non-periodic inspections. It can be maintained by good as new preventive or corrective replacements. Every inspection or replacement entails a set-up cost and a component-specific unit cost but if actions on the two components are combined, the set-up cost is charged only once. A parametric maintenance decision framework is proposed to coordinate inspection/replacement of the two components and minimize the long-run maintenance cost of the system. A stochastic model is developed on the basis of the semi-regenerative properties of the maintained system state and the associated cost model is used to assess and optimize the performance of the maintenance model. Numerical experiments emphasize the interest of a control of the operation groupings

  2. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    Marais, Karen B.

    2013-01-01

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  3. Airline experience with reliability-centered maintenance

    International Nuclear Information System (INIS)

    Matteson, T.D.

    1985-01-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.)

  4. Airline experience with reliability-centered maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Matteson, T.D.

    1985-11-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.).

  5. Youth Excel: towards a pan-Canadian platform linking evidence and action for prevention.

    Science.gov (United States)

    Riley, Barbara L; Manske, Steve; Cameron, Roy

    2011-05-15

    Population-level intervention is required to prevent cancer and other chronic diseases. It also promotes health for those living with established risk factors and illness. In this article, the authors describe a vision and approach for continuously improving population-level programs and policies within and beyond the health sector. The vision and approach are anchored in contemporary thinking about what is required to link evidence and action in the field of population and public health. The authors believe that, as a cancer prevention and control community, organizations and practitioners must be able to use the best available evidence to inform action and continually generate evidence that improves prevention policies and programs on an ongoing basis. These imperatives require leaders in policy, practice, and research fields to work together to jointly plan, conduct, and act on relevant evidence. The Propel Center and colleagues are implementing this approach in Youth Excel-a pan-Canadian initiative that brings together national and provincial organizations from health and education sectors and capitalizes on a history of collaboration. The objective of Youth Excel is to build sustainable capacity for knowledge development and exchange that can guide and redirect prevention efforts in a rapidly evolving social environment. This goal is to contribute to creating health-promoting environments and to accelerate progress in preventing cancer and other diseases among youth and young adults and in the wider population. Although prevention is the aim, health-promoting environments also can support health gains for individuals of all ages and with established illness. In addition, the approach Youth Excel is taking to link evidence and action may be applicable to early intervention and treatment components of cancer control. © 2011 American Cancer Society

  6. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Binrong

    2017-01-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  7. Joint optimization of economic production quantity and preventive maintenance with considering multi-products and reserve time

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xuejuan; Wang, Binrong

    2017-07-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cycle. In each cycle, beyond production time we also consider some reserve time for maintenance and setup, shortage and overproduction may occur. We study the integrated problem based on two PM policies, and explain the situation with the other PM policies. The delay – time concept is used to model PM decisions. Findings: Using the integrated EPQ and PM model, we can calculate the optimal production planning and PM schedule simultaneously, especially we consider multiple products in each production cycle, which is more practical and economic than previous works. Originality/value: In modern companies, the production planning and maintenance schedule share the same system, and traditional research about two activities is separated, that always generate conflicts, such as inadequate or excessive maintenance, and shortages, etc., so we develop the integrated EPQ and PM model to avoid these undesirable effects.

  8. Reliability centred maintenance of nuclear power plant facilities

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena; Hlavac, Pavol; Janicek, Frantisek

    2011-01-01

    A method for the optimization of preventive maintenance nuclear power plant equipment, i.e. reliability centred maintenance, is described. The method enables procedures and procedure schedules to be defined such as allow the maintenance cost to be minimized without compromising operational safety or reliability. Also, combinations of facilities which remain available and ensure reliable operation of the reactor unit during the maintenance of other pieces of equipment are identified. The condition-based maintenance concept is used in this process, thereby preventing unnecessary operator interventions into the equipment, which are often associated with human errors. Where probabilistic safety assessment is available, the most important structures, systems and components with the highest maintenance priority can be identified. (orig.)

  9. Integrated Assessment of Prevention and Restoration Actions to Combat Desertification

    Science.gov (United States)

    Bautista, S.; Orr, B. J.; Vallejo, R.

    2009-12-01

    Recent advances in desertification and land degradation research have provided valuable conceptual and analytical frameworks, degradation indicators, assessment tools and surveillance systems with respect to desertification drivers, processes, and impacts. These findings, together with stakeholders’ perceptions and local/regional knowledge, have helped to define and propose measures and strategies to combat land degradation. However, integrated and comprehensive assessment and evaluation of prevention and restoration strategies and techniques to combat desertification is still lacking, and knowledge on the feasibility and cost-effectiveness of the proposed strategies over a wide range of environmental and socio-economic conditions is very scarce. To address this challenge, we have launched a multinational project (PRACTICE - Prevention and Restoration Actions to Combat Desertification. An Integrated Assessment), funded by the European Commission, in order to link S & T advances and traditional knowledge on prevention and restoration practices to combat desertification with sound implementation, learning and adaptive management, knowledge sharing, and dissemination of best practices. The key activities for pursuing this goal are (1) to establish a platform and information system of long-term monitoring sites for assessing sustainable management and actions to combat desertification, (2) to define an integrated protocol for the assessment of these actions, and (3) to link project assessment and evaluation with training and education, adaptive management, and knowledge sharing and dissemination through a participatory approach involving scientists, managers, technicians, financial officers, and members of the public who are/were impacted by the desertification control projects. Monitoring sites are distributed in the Mediterranean Europe (Greece, Italy, Spain, and Portugal), Africa (Morocco, Namibia, South Africa), Middle East (Israel), China, and South and North

  10. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  11. Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-07-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the maintenance action consisting of remediation of four inactive liquid low-level radioactive tanks in Waste Area Grouping 1 at Oak Ridge National Laboratory. The four tanks to be remediated are Tanks 3001-B, 3004-B, T-30, and 3013. Tanks 3001-B, 3004-B, and T-30 will be removed from the ground. Because of logistical issues associated with excavation and site access, Tank 3013 will be grouted in place and permanently closed. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act, because the risk to human health and environment is well below the US Environmental Protection Agency's level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. A Readiness Assessment Team has been assembled to review the criteria deemed necessary to conduct the remediation tasks. These criteria include approval of all plans, acquisition of needed equipment, completion of personnel training, and coordination with plant health and safety personnel. Once the criteria have been met and documented, the task will begin. The readiness assessment is expected to be completed by late July 1995, and the task will begin thereafter

  12. Arbitral action and preventive methods against predatory journal practice

    Directory of Open Access Journals (Sweden)

    Sung Pil Park

    2018-02-01

    Full Text Available As open access model of journal publication increases, predatory journals, which deceive scholars to publish journals in fake database websites and exploit them for publishing fee, is also increasing. There are two types of predatory journals. First, journal hijacking and cybersquatting generally create fake database website by mimicking authentic database website, thereby defrauding scholars for publication fee. Second, journal phishing use scam emails to steal scholars’ personal information. If scholars suffered damage from predatory journals, scholars can take either arbitral or judicial actions. Arbitral action follows arbitrational resolution process termed Uniform Domain-Name Dispute-Resolution Policy. Scholars can join Uniform Domain-Name Dispute-Resolution Policy proceeding with legal entity that has right to authentic database website, which will result in cancellation or transfer of fake database website. In contrast, scholars can take judicial action under Anticybersquatting Consumer Protection Act, which may help scholars to recover an actual monetary damage from predatory journals. Nonetheless, taking precaution to avoid predatory journals is the best course of action, rather than going through arduous cure procedures. Scholars may prevent predatory journals by carefully examining fake database website names or email addresses, or observing unreasonable number of published article issues in predatory journal websites.

  13. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  14. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  15. Maintenance strategy for tilting table of rolling mill based on reliability considerations

    International Nuclear Information System (INIS)

    Deshpande, V.S.; Modak, J.P.

    2003-01-01

    tilting tables are 14 scheduled on-condition tasks, 10 scheduled on-restoration tasks, seven scheduled discard task. Whereas for 14 failure modes no scheduled maintenance has been proposed. Existing maintenance schedule for tilting tables indicates the maintenance action as and when required. Hence RCM based schedule specifies that additional preventive maintenance tasks need to be executed as compared to none initially. Cost incurred for this can be offset from the savings accrued from reduction in loss of production due to repetitive breakdowns. The methodology of RCM adopted in western industries cannot be applied as it is to Indian industries because of labour oriented nature, partially computerised information systems, non-availability of the information about cost of loss of production due to breakdown and age-reliability pattern of equipment, insufficient maintenance database. These problems can be overcome by development of sound MMIS, formulation of RCM review group and imparting suitable training to acquire the relevant skills in RCM. Thus RCM methodology can be applied to Indian industry for reduction of breakdowns as well as optimisation of preventive maintenance cost. This can further boost up the prospects of Indian industry to offer the products at globally competitive prices

  16. Concepts for measuring maintenance performance and methods for analysing competing failure modes

    International Nuclear Information System (INIS)

    Cooke, Roger; Paulsen, Jette

    1997-01-01

    Measurement of maintenance performance is done on the basis of component history data in which service sojourns are distinguished according to whether they terminate in corrective or preventive maintenance. From the viewpoint of data analysis, corrective and preventive maintenance constitute competing failure nudes. This article examines ways to assess maintenance performance without introducing statistical assumptions, then introduces a plausible statistical model for describing the interaction of preventive and corrective maintenance, and finally illustrates these with examples from the Nordic TUD data system

  17. Bayesian Based Diagnostic Model for Condition Based Maintenance of Offshore Wind Farms

    Directory of Open Access Journals (Sweden)

    Masoud Asgarpour

    2018-01-01

    Full Text Available Operation and maintenance costs are a major contributor to the Levelized Cost of Energy for electricity produced by offshore wind and can be significantly reduced if existing corrective actions are performed as efficiently as possible and if future corrective actions are avoided by performing sufficient preventive actions. This paper presents an applied and generic diagnostic model for fault detection and condition based maintenance of offshore wind components. The diagnostic model is based on two probabilistic matrices; first, a confidence matrix, representing the probability of detection using each fault detection method, and second, a diagnosis matrix, representing the individual outcome of each fault detection method. Once the confidence and diagnosis matrices of a component are defined, the individual diagnoses of each fault detection method are combined into a final verdict on the fault state of that component. Furthermore, this paper introduces a Bayesian updating model based on observations collected by inspections to decrease the uncertainty of initial confidence matrix. The framework and implementation of the presented diagnostic model are further explained within a case study for a wind turbine component based on vibration, temperature, and oil particle fault detection methods. The last part of the paper will have a discussion of the case study results and present conclusions.

  18. From science to action and from action to science: the Nunavik Trichinellosis Prevention Program

    Directory of Open Access Journals (Sweden)

    Sylvain Larrat

    2012-07-01

    Full Text Available Objectives. During the 1980s, walrus-meat consumption caused infections with the parasite Trichinella nativa in Nunavik inhabitants. In response to these events, stakeholders set up the community-based Nunavik Trichinellosis Prevention Program (NTPP. The objectives of the present communication are to review the NTPP, describe how science and action were interwoven in its development and identify its assets and limitations. Study design. Descriptive study. Methods. The NTPP relies on a pooled digestion assay of tongue samples taken from each harvested walrus. The public health recommendations depend on the results of the analyses: infected walrus meat should be destroyed; parasite-free meat may be eaten raw or cooked. Results. All communities involved in the walrus hunt participate in the NTPP and a high percentage of harvested walruses are included in the NTPP. Infected animals account for 2.9% of the walruses tested (20/694 since 1992. The NTPP permitted the early management of a trichinellosis event in 1997. Since then, it prevented the new occurrence of outbreaks related to walruses hunted by Nunavimmiut. Conclusions. The absence of recent major outbreaks of trichinellosis in Nunavik may reasonably be attributed to the NTPP. The success of the program stands on many facilitating factors such as the nature of the disease and its source, the existence of an efficient analytic method, the strong involvement of the different partners including direct resource users, as well as the comprehensive bidirectional science-to-action approach that has been followed.

  19. A production model and maintenance planning model for the process industry

    NARCIS (Netherlands)

    Ashayeri, J.; Teelen, A.; Selen, W.J.

    1995-01-01

    In this paper a model is developed to simultaneously plan preventive maintenance and production in a process industry environment, where maintenance planning is extremely important. The model schedules production jobs and preventive maintenance jobs, while minimizing costs associated with

  20. Effect of Maintenance Therapy with Isoxsuprine in the Prevention of Preterm Labor: Randomized controlled trial

    Science.gov (United States)

    Alavi, Azin; Rajaee, Minoo; Amirian, Malihe; Mahboobi, Hamidreza; Jahanshahi, Keramat Allah; Faghihi, Armaghan

    2015-01-01

    Background: Isoxsuprine (Vasodilan) is a beta-adrenergic that directly affects the vascular smooth muscle and results in peripheral vascular dilation. Isoxsuprine relaxes the uterine smooth muscles and is used for treatment of pre-term labor and dysmenorrhea. Isoxsuprine is used extensively in hospitals and private clinics in Iran; however, few studies have reported its safety and efficacy in the prevention of pre-term labor. Objective: The aim of this study was to assess the effect of maintenance therapy with oral isoxsuprine for the prevention of pre-term labor. Methods: We undertook a blinded prospective randomized trial of 70 women with singleton pregnancies who presented in pre-term labor between 26 to 34 weeks of gestation. After arresting the contractions with intravenous magnesium sulfate, the patients were randomized into two groups, with the treatment group receiving oral isoxsuprine until 34 weeks of gestation. Response to treatment was assessed by the progression of the pregnancies in both groups. The data were analyzed using SPSS software. Results: Our results showed that 14 (40%) of the patients in the case group and 12 (34.29%) of patients in the control group had pre-term births, and there was no significant difference between the two groups (P=0.621). Also four women (11.43%) in the case group and five women (14.29%) in the control group delivered before 34 weeks (P=0.721). Conclusion: Oral isoxsuprine was not effective as a maintenance treatment in preventing pre-term births or in delaying delivery until after 34 weeks. Larger studies are needed to identify the best treatment for pre-term labor. PMID:26396726

  1. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  2. Machine Maintenance Scheduling with Reliability Engineering Method and Maintenance Value Stream Mapping

    Science.gov (United States)

    Sembiring, N.; Nasution, A. H.

    2018-02-01

    Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.

  3. Preventive actions taken by workers after workers' health surveillance: a controlled trial

    NARCIS (Netherlands)

    Boschman, J. S.; van der Molen, H. F.; Frings-Dresen, M. H. W.; Sluiter, J. K.

    2013-01-01

    To evaluate construction workers' preventive actions and occupational physician's (OPs) recommendations after a job-specific workers' health surveillance (WHS) compared with the currently used generic WHS. After the WHS, the OPs' written recommendations were captured. At the 3-month follow-up, the

  4. Perceptions of students and teachers about institutional actions to prevent school violence in public schools in Cúcuta

    Directory of Open Access Journals (Sweden)

    María de los Santos Rincón-Ramírez

    2017-07-01

    Full Text Available Violence in schools is a problem that has worried broad sectors of society, not only because of its immediate effects but also due to the repercussions it may have in the future. In many institutions the violence is not acknowledged, and no actions are taken to prevent it. In contrast other institutions confront the violence head on through preventive and corrective actions that uncomplicated daily coexistence. It is in this context that this paper relays the results of a study on student and teacher attitudes to violence manifestations in the schools of Cucuta, Colombia; and on institutional prevention strategies. The quantitative-type research, executed with a descriptive and exploratory approach, used a sample of 348 students from sixth to eleventh grade, their ranging in age from 10 to 16 years old; and 87 high school teachers. The results highlight the frequently occurring forms of aggression, as well as the preventive strategies and actions schools emplace to handle cases of violence.

  5. Joint Optimization of Economic Production Quantity and Preventive Maintenance with Considering Multi-Products and Reserve Time

    OpenAIRE

    Liu, Xuejuan; Wang, Binrong

    2017-01-01

    Purpose: We deal with the problem of the joint determination of optimal economic production quantity (EPQ) and optimal preventive maintenance (PM) for a system that can produce multiple products alternately. The objective is to find the optimal number of production cycles and the PM policy simultaneously by minimizing the cost model. Design/methodology/approach: Considering the products go through the system in a sequence and a complete run of all products forms a production cy...

  6. A maintenance optimization model for mission-oriented systems based on Wiener degradation

    International Nuclear Information System (INIS)

    Guo, Chiming; Wang, Wenbin; Guo, Bo; Si, Xiaosheng

    2013-01-01

    Over the past few decades, condition-based maintenance (CBM) has attracted many researchers because of its effectiveness and practical significance. This paper deals with mission-oriented systems subject to gradual degradation modeled by a Wiener stochastic process within the context of CBM. For a mission-oriented system, the mission usually has constraints on availability/reliability, the opportunity for maintenance actions, and the monitoring type (continuous or discrete). Furthermore, in practice, a mission-oriented system may undertake some preventive maintenance (PM) and after such PM, the system may return to an intermediate state between an as-good-as new state and an as-bad-as old state, i.e., the PM is not perfect and only partially restores the system. However, very few CBM models integrated these mission constraints together with an imperfect nature of the PM into the course of optimizing the PM policy. This paper develops a model to optimize the PM policy in terms of the maintenance related cost jointly considering the mission constraints and the imperfect PM nature. A numerical example is presented to demonstrate the proposed model. The comparison with the simulated results and the sensitivity analysis show the usefulness of the optimization model for mission-oriented system maintenance presented in this paper.

  7. 7 CFR 1730.25 - Corrective action.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Corrective action. 1730.25 Section 1730.25... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.25 Corrective action. (a) For any items on the RUS Form 300 rated unsatisfactory (i.e., 0 or 1) by the borrower...

  8. Management of remanent lifetime. Short-term benefits of the maintenance evaluation and improvement programme

    International Nuclear Information System (INIS)

    Sainero Garcia, J.

    1993-01-01

    Remanent Lifetime Management, which is scientifically based on knowing the degradatory phenomena associated with aging, today allows us to optimize plant life through a long-term maintenance strategy combining preventive maintenance and condition monitoring programmes. Within a project for Remanent Lifetime Management (RLM), the determination of methods of control and mitigation of degradations due to aging depends on the programme of Maintenance Evaluation and Improvement (MEI). This programme, underpinned by the analysis of degradatory phenomena to which plant components are subjected, evaluates current maintenance practices and defines the complementary actions which would facilitate establishment of a long-term strategy to control aging. Together with this main objective of the RLM project, the MEI programme achieves short-term benefits since, right from the beginning, it offers solutions to mitigate and guard against degradations in crucial plant components, and generally sets out a programme to control aging. The MEI programme further serves as a tool to reach the final objectives of the new 10CFR50.65 rule, 'Requirements for Maintenance Programs for NPPs'. The MEI always offers the option should the Utility Owner decide to extend plant life. (author)

  9. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  10. Comparative evaluation of maintenance performance using subsurvival functions

    DEFF Research Database (Denmark)

    Paulsen, J.L.; Cooke, R.; Nyman, R.

    1997-01-01

    Subsurvival functions are applied to operational data for the control rod drive systems of Nordic nuclear reactors to evaluate maintenance performance. Competing failure modes are preventive and corrective maintenance. Maintenance indicators are defined and evaluated for 8 plants. (C) 1997 Elsevier...

  11. Maintenance Personnel Performance Simulation (MAPPS) model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Knee, H.E.; Haas, P.M.

    1984-01-01

    A stochastic computer model for simulating the actions and behavior of nuclear power plant maintenance personnel is described. The model considers personnel, environmental, and motivational variables to yield predictions of maintenance performance quality and time to perform. The mode has been fully developed and sensitivity tested. Additional evaluation of the model is now taking place

  12. Human factor analysis and preventive countermeasures of maintenance in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Hu Chao

    2008-01-01

    Based on the human error analysis theory and the characteristics of maintenance in a nuclear power plant, human factors of maintenance in NPP are divided into three different areas: human, technology, and organization, in which human refers to the individual factors, mainly including psychological quality, physiological characteristic, state of health, knowledge, skill level, and interpersonal relationship. Technology includes the maintenance technology, maintenance strategy, maintenance tool, maintenance interface, maintenance regulation, and work environment. Organization includes task arrangement, information communication, training, personnel external environment, team construction, and leadership. The analysis also reveals that the organization factors, which can indirectly influence personnel performance, are the primary initiators of human error. Based on these, some countermeasures are brought forward in order to reduce human errors. (authors)

  13. Maintenance Planning for Historic Buildings

    Directory of Open Access Journals (Sweden)

    Diana Plian

    2008-01-01

    Full Text Available The key to good maintenance of historic buildings is a long-range maintenance plan. Long-range planning recognizes a responsibility to the future to prolong the useful life of a building by preserving it in its present condition and preventing or slowing deterioration and damage from natural or other causes.

  14. Verifying elementary ITER maintenance actions with the MS2 benchmark product

    NARCIS (Netherlands)

    Heemskerk, C. J. M.; Elzendoorn, B. S. Q.; Magielsen, A. J.; Schropp, G. Y. R.

    2011-01-01

    A new facility has been taken in operation to investigate the influence of visual and haptic feedback on the performance of remotely executed ITER RH maintenance tasks. A reference set of representative ITER remote handling maintenance tasks was included the master slave manipulator system (MS2)

  15. Predicting maintenance of attendance at walking groups: testing constructs from three leading maintenance theories.

    Science.gov (United States)

    Kassavou, Aikaterini; Turner, Andrew; Hamborg, Thomas; French, David P

    2014-07-01

    Little is known about the processes and factors that account for maintenance, with several theories existing that have not been subject to many empirical tests. The aim of this study was to test how well theoretical constructs derived from the Health Action Process Approach, Rothman's theory of maintenance, and Verplanken's approach to habitual behavior predicted maintenance of attendance at walking groups. 114 participants, who had already attended walking groups in the community for at least 3 months, completed a questionnaire assessing theoretical constructs regarding maintenance. An objective assessment of attendance over the subsequent 3 months was gained. Multilevel modeling was used to predict maintenance, controlling for clustering within walking groups. Recovery self-efficacy predicted maintenance, even after accounting for clustering. Satisfaction with social outcomes, satisfaction with health outcomes, and overall satisfaction predicted maintenance, but only satisfaction with health outcomes significantly predicted maintenance after accounting for clustering. Self-reported habitual behavior did not predict maintenance despite mean previous attendance being 20.7 months. Recovery self-efficacy, and satisfaction with health outcomes of walking group attendance appeared to be important for objectively measured maintenance, whereas self-reported habit appeared not to be important for maintenance at walking groups. The findings suggest that there is a need for intervention studies to boost recovery self-efficacy and satisfaction with outcomes of walking group attendance, to assess impact on maintenance.

  16. 40 CFR 63.1160 - Compliance dates and maintenance requirements.

    Science.gov (United States)

    2010-07-01

    ... corrective action within 1 working day of detection; and (iii) Maintenance of a daily record, signed by a... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Compliance dates and maintenance... Facilities and Hydrochloric Acid Regeneration Plants § 63.1160 Compliance dates and maintenance requirements...

  17. Analysis of the possibility of applying a condition-based maintenance model on an example of tank weapons

    Directory of Open Access Journals (Sweden)

    Igor J. Epler

    2013-12-01

    the safety degree on the observed sections. Comparing the actual level of safety with the projected level, we can decide on the action of maintenance to be implemented in order to prevent failure. The data from Table 1 and the methodology for the selection of maintenance strategies (Figure 1, in the case of a weakened or damaged magnets for electric firing on the tank 7.62 mm machine gun indicate the possibilities of the condition-based maintenance model with the control of reliability levels. Conclusion The introduction of the condition-based maintenance model would minimize overall costs because the “reliability reserve” of components or representative tank weapons would be used to the maximum. On the other hand, the current maintenance system of tank weapons would experience some changes. The intensity of preventive maintenance actions could be reduced and particular maintenance levels might be omitted  as well as specific types of maintenance (easy maintenance, medium maintenance

  18. 40 CFR 68.56 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.56 Maintenance. (a) The owner or operator shall prepare and implement procedures to maintain the on-going mechanical integrity of the process...

  19. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  20. Probabilistic approach to rationalization of plants maintenance

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Uchimoto, Tetsuya; Miya, Kenzo

    2001-01-01

    Since there are a lot of equipments in large plants, their safety and reliability cannot be kept as high level as designed without maintenance activities. Then preventive maintenance is intensively executed in some large plants. However, it will be inefficient to perform the preventive maintenance blindly. To make maintenance activities effective, it is essential to identify the critical equipments influencing plant safety and/or reliability and carry out the maintenance by focusing attentions on these equipments. It needs quantitative analyses to identify the critical equipments based on the data of failure rates. However, complete data set of failure rates cannot necessarily be available for some plants such as nuclear power plants. In this study, we carry out the reliability analysis for generic LNG plant and calculate various quantitative risk importance measures for each equipment. We propose rather qualitative representations for some quantitative measures, considering the situation without complete data set and conclude that it is possible to rationalize maintenance procedure by using these rather qualitative measures, though the level of rationalization is of course limited. (author)

  1. Perspective of the Westinghouse steam generator secondary side maintenance approach

    Energy Technology Data Exchange (ETDEWEB)

    Ramaley, D. [Westinghouse Electric Company LLC, Cranberry Township, Pennsylvania (United States)

    2012-07-01

    Historically, Westinghouse had developed a set of steam generator secondary maintenance guidelines focused around performing recurring activities each outage without direct regards to the age, deposit loading, operational status, or corrosion status of the steam generator. Through the evolution of steam generator design and steam generator condition data, Westinghouse now uses a proactive assessment and planning approach for utilities. Westinghouse works with utilities to develop steam generator secondary maintenance plans for long term steam generator viability. Westinghouse has developed a portfolio of products to allow utilities to optimize steam generator operability and develop programs aimed at maintaining the steam generator secondary side in a favorable condition for successful long term operation. Judicious use of the means available for program development should allow for corrosion free operation, long term full power operation at optimum thermal efficiency, and leveling of outage expenditures over a long period of time. This paper will review the following required elements for an effective steam generator secondary side strategy: • Assessment: In order to develop an appropriate maintenance strategy, actions must be taken to obtain an accurate picture of the SG secondary side condition. • Forecasting: Using available data predictions are developed for future steam generator conditions and required maintenance actions. • Action: Cost effective engineering and maintenance actions must be completed at the appropriate time as designated by the plan. • Evaluation of Results: Following execution of maintenance tactics, it is necessary to revise strategy and develop technology enhancements as appropriate. (author)

  2. Inspection, evaluation and maintenance guidelines for reactor vessel internals in JAPAN

    International Nuclear Information System (INIS)

    Sakashita, Akihiro; Goto, Tomoya; Hirano, Shinro; Dozaki, Koji

    2010-01-01

    Inspection and Evaluation Guidelines for reactor internals has been taken into the Rules on Fitness-for–Service for Nuclear Power Plants of The Japan Society of Mechanical Engineers. It is a base of the maintenance plan of each Nuclear Power Plant. A plant maintenance methodology will have more importance to maintain the plant safety and stable plant operation. This paper introduces the systematization of the maintenance such as repair, replacement, preventive maintenance in these guidelines. Maintenance methodologies are classified follows. Repair: methodology to reinforce degraded parts by some methods or prevent progress of degradation of without replacement of the existing structure when the degradation of structure is actualized. Replacement: methodology to replace the existing structure with new one when the degradation of structure is actualized. Preventive maintenance : methodology to mitigate the damaged condition. When the maintenance methodologies are implemented in the actual plant, we have to consider the feedback of the inspection program and plant life management. (author)

  3. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Doyle, E.K.; Lee, C.-G.; Cho, D.

    2005-01-01

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  4. Preventive maintenance. 'Problem recognition style' can be used to segment the market and promote healthier lifestyles.

    Science.gov (United States)

    Jayanti, R K

    1997-01-01

    Problem recognition styles--desired state types (DSTs) and actual state types (ASTs)--have an effect on preventive health care decision making. Segmenting the market along these lines can help marketers position products and services to educate and attract people who will not see a doctor unless there is something wrong with them. Both groups expect the same benefits from preventive health care actions, but ASTs fail to act on those expectations. Therefore, marketing strategy touting the benefits of preventive health care might be futile. Educational promotional campaigns aimed at both DSTs and ASTs also are wasteful because DSTs already possess much health knowledge, lead wellness-oriented lifestyles, and practice preventive health behaviors.

  5. Research within the coordinated programme on investigation of maintenance of nuclear instrumentation in developing countries. Latin America

    International Nuclear Information System (INIS)

    Guzman-Acevedo, C.

    1980-06-01

    The situation in Peru with regard to the maintenance and repair of instruments used in nuclear medicine is presented. On the basis of responses to questionnaires it appears that 56 instruments for nuclear medicine are in use in the country, almost exclusively in the capital Lima. The average age of the instruments is 9.5 years. They are in use about 16.4% of the possible time. The development of nuclear medicine in Peru is in its initial stages and difficulties encountered arise both from the lack of training and experience in nuclear medicine on the part of the medical personnel as well as lack of experience of the technicians responsible for instrument maintenance. Practically no preventive maintenance ever takes place; action is only taken when an instrument breaks down. Various suggestions are made in order to attempt an improvement of the situation

  6. The impact of preventive maintenance practices on manufacturing performance: A proposed model for SMEs in Malaysia

    Science.gov (United States)

    Lazim, Halim Mad; Taib, Che Azlan; Lamsali, Hendrik; Saleh, Mohamed Najib; Subramaniam, Chandrakantan

    2016-08-01

    Preventive maintenance (PM) plays important role to avoid or mitigate potential stoppages and disruptions of equipment or machinery from occurring in daily operations. PM emphasized total employee involvement and it is important for companies as well as Small and Medium Sized Enterprises (SMEs). SME sectors contribution to the Malaysian economy makes up 95% of the total manufacturers, however PM remain relatively lacking. The ability, reliability and effective maintenance management is highly important in order to achieve desired manufacturing performance. Therefore, organizational capability in planning, controlling, implementing and monitoring PM activities is important. Furthermore, empirical evidence on the potential impact of PM practices towards manufacturing performance with organizational capability as a moderating effect is still limited and indecisive. Henceforth, this paper aims to explore and investigate potential relationships between PM practices and manufacturing performance moderated by organizational capability in the contact of Malaysian SMEs in the manufacturing sector. Correspondently, the study intends to propose a new research framework and hypotheses to examine the abovementioned relationships. The proposed framework includes PM team, PM strategy and planned maintenance as the determinants, while organizational capability serves as the moderating variable. Manufacturing performance will be viewed in terms of innovation and financial factors. Proposed research direction and conclusion are discussed at the end of the study.

  7. Preventive and Predictive Maintenance, Warehousing of Spares, Periodic Testing and In-Service Inspection Activities at the Nigerian Research Reactor-1 Facility

    Energy Technology Data Exchange (ETDEWEB)

    Yusuf, I.; Mati, A. A.; Dewu, B. B.M., [Centre for Energy Research and Training, Ahmadu Bello University, Zaria (Nigeria)

    2014-08-15

    The Nigerian Research Reactor–1, or NIRR-1, is sited at Centre for Energy Research and Training, Ahmadu Bello University, Zaria, Nigeria. Activities on preventive or routine maintenance have been institutionalized since the commissioning of the reactor in February 2004. This has grossly reduced the rates of corrective maintenance activities and helped the reactor management a great deal in predicting failure rates of reactor components and other auxiliary units. Routine maintenance of systems and components are being carried out on a weekly, quarterly and annual basis based on manufacturer’s recommendations, which have been reviewed and improved over the years. The paper presents the implementation of maintenance activities in NIRR-1 from its initial criticality in 2004 till today and the new scheme for periodic testing and in-service-inspection developed after an IAEA Integrated Safety Assessment of Research Reactors mission. The measures put in place are envisaged to reduce the negative impact of ageing on NIRR-1 and its auxiliary systems. (author)

  8. A study of the effect of maintenance on the safety of a mechanical system subject to aging and its application to steam generator tube degradation

    International Nuclear Information System (INIS)

    Dussarte, D.

    1991-11-01

    The different degradation mechanisms to which pressurized water reactor steam generator tubes are observed to be subject may result in the risk of their rupture being greater than anticipated. Prevention of tube rupture essentially consists of inspections during outages of the units and applying appropriate criteria for the withdrawal of defective tubes from service. Planning such measures implies being able to gauge the effectiveness of the action taken. This document describes a proposed technique for quantifying the effects of the preventive maintenance we have had to develop to address this problem and, hence, to obtain material for assessing the action taken by the utility. (author)

  9. Towards peer education prevention of school dropout: An exploratory analysis of an action-research study

    Directory of Open Access Journals (Sweden)

    Colucci Gabriella

    2017-01-01

    Full Text Available This paper presents the exploratory analysis of an action-research into dropout prevention in an Italian secondary school. By taking into account the representations of teachers, students and parents, different activities of peer education have been implemented during the school year in a city of Sardinia in order to promote school success. The study is based on a mixed-methods design, including focus groups with teachers, students and parents, as well as classroom observations. The action-research consists of different interventions: firstly, the participants’ representations of school dropout have been collected; then, a specific program of peer education has been proposed through activities of role-playing, simulations, brainstorming, and improvement of life skills (during training meetings with the participants. Thereafter, the action-research has been qualitatively analysed, with the findings indicating possible directions of re-creating school practices that could have potential benefits in preventing dropout.

  10. Insider Threat: Preventing Direct Action Attacks Within the United States Army

    Science.gov (United States)

    2017-06-09

    Intelligence Agency, 2012. Joint Chiefs of Staff. Joint Publication (JP) 3-07.2, Antiterrorism. Washington, DC: Government Printing Office, 2010. 81...Federal Bureau of Investigation GEN General (Army rank, O-10) HIPAA Health Insurance Portability and Accountability Act of 1996 INSCOM Intelligence and...commanders, and the intelligence community to prevent insider threats from developing into direct action attacks, this study sought to answer the

  11. Analysis of trends in aviation maintenance risk: An empirical approach

    International Nuclear Information System (INIS)

    Marais, Karen B.; Robichaud, Matthew R.

    2012-01-01

    Safety is paramount in the airline industry. A significant amount of effort has been devoted to reducing mechanical failures and pilot errors. Recently, more attention has been devoted to the contribution of maintenance to accidents and incidents. This study investigates and quantifies the contribution of maintenance, both in terms of frequency and severity, to passenger airline risk by analyzing three different sources of data from 1999 to 2008: 769 NTSB accident reports, 3242 FAA incident reports, and 7478 FAA records of fines and other legal actions taken against airlines and associated organizations. We analyze several safety related metrics and develop an aviation maintenance risk scorecard that collects these metrics to synthesize a comprehensive track record of maintenance contribution to airline accidents and incidents. We found for example that maintenance-related accidents are approximately 6.5 times more likely to be fatal than accidents in general, and that when fatalities do occur, maintenance accidents result in approximately 3.6 times more fatalities on average. Our analysis of accident trends indicates that this contribution to accident risk has remained fairly constant over the past decade. Our analysis of incidents and FAA fines and legal actions also revealed similar trends. We found that at least 10% of incidents involving mechanical failures such as ruptured hydraulic lines can be attributed to maintenance, suggesting that there may be issues surrounding both the design of and compliance with maintenance plans. Similarly 36% of FAA fines and legal actions involve inadequate maintenance, with recent years showing a decline to about 20%, which may be a reflection of improved maintenance practices. Our results can aid industry and government in focusing resources to continue improving aviation safety.

  12. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1997-01-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  13. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  14. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  15. 40 CFR 63.9600 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... instructions for routine and long-term maintenance. (2) Corrective action procedures for bag leak detection... 40 Protection of Environment 14 2010-07-01 2010-07-01 false What are my operation and maintenance... and Maintenance Requirements § 63.9600 What are my operation and maintenance requirements? (a) As...

  16. 40 CFR 63.7300 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ...-term maintenance. (3) Corrective action for all baghouses applied to pushing emissions. In the event a... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my operation and maintenance... Battery Stacks Operation and Maintenance Requirements § 63.7300 What are my operation and maintenance...

  17. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  18. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    For offshore wind turbines, maintenance costs are substantial due to a large number of component failures. In addition to the repair costs, equipment costs and lost production costs are large due to limited accessibility to the turbines. In order to reduce the costs, preventive methods can be used......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... maintenance costs, and many studies have also been published for preventive maintenance. However, an important part is the modeling of the relationship between maintenance and reliability, which is typically not modeled in a consistent way. Therefore, the methods cannot be used directly for optimal...

  19. Application of reliability centered maintenance to Embalse NPP

    International Nuclear Information System (INIS)

    Torres, Antonio; Perdomo, Manuel; Fornero, Damian; Corchera, Roberto

    2010-01-01

    One of the most recent applications of Probabilistic Safety Analysis to Embalse NPP is the Safety Oriented Maintenance Program developed through the Reliability Centered Maintenance (RCM) methodology. Such an application was carried out by a cooperated effort between the staff of nuclear safety department of NPP and experts from Instituto Superior de Tecnologias y Ciencias Aplicadas of Cuba. So far 6 technological systems have been analyzed with important results regarding the optimization of preventive and predictive maintenance program of those systems. Any tasks of RCM were automated via MOSEG code. The results of this study were focused on the elaboration and modification of the Preventive Program, prioritization of stocks, reorientation of predictive techniques and modification in the time parameters of maintenance. (author)

  20. 40 CFR 63.1447 - What are my operation and maintenance requirements?

    Science.gov (United States)

    2010-07-01

    ... corrective action according to written procedures specified in your operation and maintenance plan to... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my operation and maintenance... Maintenance Requirements § 63.1447 What are my operation and maintenance requirements? (a) As required by § 63...

  1. Gentilly 2 maintenance in a total quality environment

    Energy Technology Data Exchange (ETDEWEB)

    Ross, M H; Marois, H [Hydro-Quebec, Gentilly (Canada). Gentilly Generating Station

    1993-12-31

    Comprehensive preventive maintenance programs at Gentilly-2 Nuclear Generating Station are based on a policy that seeks to balance requirements against resources. A commitment to total quality aims at performance improvement and total customer satisfaction. To improve overall performance to an annual availability factor of 90%, planned outages must be limited to 21 days per year, and the preventive maintenance program must be upgraded. A quality improvement team is involved in supporting this initiative. This team will seek to bring a new balance to the program, and eventually optimize it, using reliability-centred maintenance techniques. 24 figs.

  2. Scheduling the maintenance of gaseous diffusion and electric power distribution plants

    International Nuclear Information System (INIS)

    Chauvet, D.

    1990-01-01

    A computer aided scheduling applied to the maintenance of a uranium enrichment plant is presented. The plant exploits gaseous diffusion and electric power distribution plants, for which the operating conditions must be satisfied. The management and the execution of the maintenance actions are computer aided. Concerning the techniques, the cost, the safety and the scheduling actions were optimized [fr

  3. Initiating statistical maintenance optimization

    International Nuclear Information System (INIS)

    Doyle, E. Kevin; Tuomi, Vesa; Rowley, Ian

    2007-01-01

    Since the 1980 s maintenance optimization has been centered around various formulations of Reliability Centered Maintenance (RCM). Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy includes evaluation of statistical optimization techniques. A review of successful pilot efforts in this direction is provided as well as initial work with graphical analysis. The present situation reguarding data sourcing, the principle impediment to use of stochastic methods in previous years, is discussed. The use of Crowe/AMSAA (Army Materials Systems Analysis Activity) plots is demonstrated from the point of view of justifying expenditures in optimization efforts. (author)

  4. Safety related maintenance in the framework of the reliability centered maintenance concept

    International Nuclear Information System (INIS)

    1992-07-01

    Elevated safety requirements and ever increasing costs of maintenance of nuclear power plants stimulate the interest in different methods and approaches to optimize maintenance activities. Among different concepts, the Reliability Centered Maintenance (RCM) as an approach to improve Preventive Maintenance (PM) programmes is being widely discussed an applied in several IAEA Member States. In order to summarize basic principles and current implementation of the RCM, the IAEA organized a Consultants Meeting in November 1990. The report prepared during that meeting was discussed during the Technical Committee Meeting (TCM) held in May 1991. Numerous technical presentations as well as panel and plenary discussions took place at the TCM. This document contains the report of the Consultants Meeting (modified to include comments of the TCM), a summary of the most important discussions as well as all 14 papers presented at the TCM

  5. Preventive maintenance basis: Volume 10 -- High voltage electric motors (5 kV and greater). Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. Volume 10 of the report provides a program of PM tasks suitable for application to high voltage (5kV and greater) electric motors in nuclear power plants. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs. Reactor Coolant Pumps motors (RCP's) are not excluded from this report in so far as good PM practices for motors of the appropriate class are concerned. However, the special auxiliary equipment normally associated with RCP's has not been included. Consequently, this report does not provide a complete PM program for RCP's. Industry and vendor programs for RCP's should be consulted for complete definition of RCP motor PM programs

  6. Possibilities for teacher’s preventive actions in regard bullying behavior of students

    Directory of Open Access Journals (Sweden)

    Marković Marija R.

    2015-01-01

    Full Text Available Prevention of school bullying is an important task of modern educational process, given the seriousness of its consequences for students who behave violently and for those who are exposed to bullying, as well as for other classmates. A teacher, who in comparison with other school staff is in daily contact with students, has an extremely important role in prevention of bullying and in creating encouraging school climate. Through systematized and critical reflection on the views of numerous authors, this article aims at pointing out importance of certain aspects of teachers‘ role in prevention of bullying, and importance of creating a positive school climate as an important prerequisite for preventive activity of teachers, as well as at emphasizing possible obstacles to adequate preventive actions of teachers. In the last section, changes made in recent years in Serbia in regard to prevention of bullying behavior of students in the education system are considered. [Projekat Ministarstva nauke Republike Srbije, br. 179013: Održivost identiteta Srba i nacionalnih manjina u pograničnim opštinama istočne i jugoistočne Srbije

  7. Dutch monitor on stress and physical load : risk factors, consequences, and preventive action

    NARCIS (Netherlands)

    Houtman, I.L.D.; Goudswaard, A.; Dhondt, S.; Grinten, M.P. van der; Hildebrandt, V.H.; Poel, E.G.T. van der

    1998-01-01

    Objectives - Due to recent changes in legislation on occupational health and safety, a national monitor on stress and physical load was developed in The Netherlands to monitor (a) risks and consequences of stress and physical load at work, (b) preventive actions in companies to reduce these risks,

  8. Maintenance of the Hanford cone penetrometer platform during fiscal year 1999

    International Nuclear Information System (INIS)

    IWATATE, D.F.

    1998-01-01

    This SOW describes services requested of Applied Research and Associates, Inc. (ARA), as a commercial provider of cone penetrometer equipment and services, to provide routine inspection and minimum preventive maintenance on the Hanford CP Platform (CPP) during Fiscal Year 1999. This SOW specifically pertains to the maintenance of the CPP and associated support equipment and is limited in scope to routine preventive maintenance and identification of any deficiencies. ARA is the original manufacturer of the CPP and will conduct this work following the vendor-prepared maintenance schedule

  9. Introducing artificial depth cues to improve task performance in ITER maintenance actions

    NARCIS (Netherlands)

    Heemskerk, C.J.M.; Eendebak, P.T.; Schropp, G.Y.R.; Hermes, H.V.; Elzendoorn, B.S.Q.; Magielsen, A.J.

    2013-01-01

    Maintenance operations on ITER tokamak components will be largely performed by remote handling. In previous work it was shown that representative maintenance tasks could be performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators

  10. Let us prevent occupational cancers - Paris, 18-20 November 2009

    International Nuclear Information System (INIS)

    Delepine, A.; Falcy, M.; Hery, M.

    2010-01-01

    This document first presents and comments the proposals for action made by the colloquium scientific committee: improvement of the policy of information on risks, identification, suppression and substitution of carcinogenic products, improved action towards very small and medium-sized enterprises, and a better consideration of activities related to production (maintenance, cleaning and so on). The next part proposes large abstracts of contributions on various themes: current status (changes of institutions and practices of prevention, the CMR national plan, experience and action of a CHSCT of the oil industry sector), present issues (occupational cancers, detection of emerging pathologies in occupational environment), assessment of the number of occupational cancers, exposure characterization and assessment, mobilization and substitution, exposure tracing, information, training and awareness raising

  11. Photovoltaic power plants maintenance; El mantenimiento en plantas fotovoltaicas

    Energy Technology Data Exchange (ETDEWEB)

    Suanzes, F.; Rodelgo, I.

    2010-07-01

    It is reviewed the evolution of the maintenance contracts in solar facilities in a young environment and with a large projection. Thus, is described the preventive maintenance in this kind of facilities, and are also analyzed the most relevant cases of corrective maintenance. (Author)

  12. A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Ejlertsen, Lena Secher

    2017-01-01

    A railway signaling system is a complex and interdependent system which should ensure the safe operation of trains. We introduce and address a mixed integer optimisation model for the preventive signal maintenance crew scheduling problem in the Danish railway system. The problem contains many...... to feed as ‘warm start’ solutions to a Mixed Integer Programming (MIP) solver for further optimisation. We apply the CP/MIP framework to a section of the Danish rail network and benchmark our results against both direct application of a MIP solver and modelling the problem as a Constraint Optimisation...

  13. Predictive Maintenance--An Effective Money Saving Tool Being Applied in Industry Today.

    Science.gov (United States)

    Smyth, Tom

    2000-01-01

    Looks at preventive/predictive maintenance as it is used in industry. Discusses core preventive maintenance tools that must be understood to prepare students. Includes a list of websites related to the topic. (JOW)

  14. Evaluation of the adequacy of maintenance tasks using the failure consequences of railroad vehicles

    International Nuclear Information System (INIS)

    Kim, Jaehoon; Jeong, Hyun- Yong

    2013-01-01

    The purpose of this study is to improve the efficiency, reliability and safety related to railroad maintenance tasks through an evaluation of the consequences of failures. The brake system was selected based on the failure data obtained from railroad vehicles in operation as one of the safety systems in railroad vehicles. The failure causes, failure effects, and the criticality of the failure mode were drawn for 62 failure modes of the braking system through the use of an FMECA for the 30 sub-devices having primary functions. The various maintenance tasks for the braking system were categorized into the 62 failure modes and failure consequences using the FMECA and the logic of maintenance decisions. Braking systems manufactured by the same manufacturer and operated by two different operators were studied in an effort to analyze preventive maintenance and to evaluate the adequacy of preventive maintenance tasks for the 62 failure modes. Based on results of the evaluation of these preventive maintenance tasks, new maintenance tasks were proposed, and concrete cost-cutting effects were determined from the calculation of the maintenance time and expected costs, using a preventive maintenance template developed specifically for railroad vehicles

  15. Design, operations, and maintenance of the soil vapor extraction systems for the 200 West Area Carbon Tetrachloride Expedited Response Action

    International Nuclear Information System (INIS)

    Tranbarger, R.K.

    1996-05-01

    This report provides the design, operating, and maintenance guidelines for the soil vapor extraction (SVE) systems implemented as part of the 200 West Area Carbon Tetrachloride ERA. Additionally, this document provides general information regarding the ERA, the SVE system design, and the general approach towards soil vapor extraction. The remaining content of this document includes the following: regulatory compliance; summary of vadose zone physical and containment characteristics; past and present SVE system designs and potential design upgrades; general design and monitoring considerations for the SVE systems; descriptions of the SVE system components and their respective functions; safety requirements; operation of the SVE systems including startup, surveillances, shutdown, GAC canister changeouts, and wellfield characterization; monitoring requirements; SVE optimization; and instrument calibrations, preventive maintenance, and spare parts and site inventory requirements

  16. Development Of An Optimal Planning And Maintenance System A Case Study Of Shell Petroleum Development Company Obigbo Node

    Directory of Open Access Journals (Sweden)

    Temple Temple Amachree

    2017-08-01

    Full Text Available Preventive and breakdown maintenance system for a gas compressor plant were analyzed and appraised using established maintenance tools. To determine this comparative cost benefit analysis of preventive and breakdown maintenance activities on Agbada gas compressor plant of the Shell Petroleum Development Company was carried out. The cost of achieving 20000 run hours overhaul preventive maintenance with some disused repaired parts was analyzed and compared with the cost of carrying out the same activity with all new parts. Comparative studies showed that carrying out preventive maintenance with repairable parts which were recovered in the as new state is more cost effective than using all new parts. A cost saving of 14.63 was achieved. The same trend was also observed when the cost benefit analysis was carried out in breakdown maintenance option. This again gave a cost savings of 7.51 when repaired disused parts were used. The results showed that the rate of return on investment if breakdown maintenance is adopted is 24 as compared to the rate of return 01 26 that was obtained when preventive maintenance system was used. An NPV of N6703491725.00 and N5371346424.00 were obtained for preventive maintenance and breakdown maintenance respectively. It is therefore observed that preventive maintenance system strategy presented a better NPV over breakdown maintenance.

  17. Risk assessment of maintenance operations: the analysis of performing task and accident mechanism.

    Science.gov (United States)

    Carrillo-Castrillo, Jesús A; Rubio-Romero, Juan Carlos; Guadix, Jose; Onieva, Luis

    2015-01-01

    Maintenance operations cover a great number of occupations. Most small and medium-sized enterprises lack the appropriate information to conduct risk assessments of maintenance operations. The objective of this research is to provide a method based on the concepts of task and accident mechanisms for an initial risk assessment by taking into consideration the prevalence and severity of the maintenance accidents reported. Data were gathered from 11,190 reported accidents in maintenance operations in the manufacturing sector of Andalusia from 2003 to 2012. By using a semi-quantitative methodology, likelihood and severity were evaluated based on the actual distribution of accident mechanisms in each of the tasks. Accident mechanisms and tasks were identified by using those variables included in the European Statistics of Accidents at Work methodology. As main results, the estimated risk of the most frequent accident mechanisms identified for each of the analysed tasks is low and the only accident mechanisms with medium risk are accidents when lifting or pushing with physical stress on the musculoskeletal system in tasks involving carrying, and impacts against objects after slipping or stumbling for tasks involving movements. The prioritisation of public preventive actions for the accident mechanisms with a higher estimated risk is highly recommended.

  18. An Improved Distribution Policy with a Maintenance Aspect for an Urban Logistic Problem

    Directory of Open Access Journals (Sweden)

    Nadia Ndhaief

    2017-07-01

    Full Text Available In this paper, we present an improved distribution plan supporting an urban distribution center (UDC to solve the last mile problem of urban freight. This is motivated by the need of UDCs to satisfy daily demand in time under a high service level in allocated urban areas. Moreover, these demands could not be satisfied in individual cases because the delivery rate can be less than daily demand and/or affected by random failure or maintenance actions of vehicles. The scope of our work is to focus on a UDC, which needs to satisfy demands in a finite horizon. To that end, we consider a distribution policy on two sequential plans, a distribution plan correlated to a maintenance plan using a subcontracting strategy with several potential urban distribution centers (UDCs and performing preventive maintenance to ensure deliveries for their allocated urban area. The choice of subcontractor will depend on distance, environmental and availability criteria. In doing so, we define a mathematical model for searching the best distribution and maintenance plans using a subcontracting strategy. Moreover, we consider delay for the next periods with an expensive penalty. Finally, we present a numerical example illustrating the benefits of our approach.

  19. An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart

    International Nuclear Information System (INIS)

    Panagiotidou, Sofia; Nenes, George

    2009-01-01

    This paper proposes a model for the economic design of a variable-parameter (Vp) Shewhart control chart used to monitor the mean in a process, where, apart from quality shifts, failures may also occur. Quality shifts result in poorer quality outcome, higher operational cost and higher failure rate. Thus, removal of such quality shifts, besides improving the quality of the outcome and reducing the quality cost, is also a preventive maintenance (PM) action since it reduces the probability of a failure and improves the equipment reliability. The proposed model allows the determination of the scheme parameters that minimize the total expected quality and maintenance cost of the procedure. The monitoring mechanism of the process employs an adaptive Vp-Shewhart control chart. To evaluate the effectiveness of the proposed model, its optimal expected cost is compared against the optimum cost of a fixed-parameter (Fp) chart

  20. Pavement condition assessment to forecast maintenance program on JKR state roads in Petaling district

    Science.gov (United States)

    Hamsan, R.; Hafiz, H.; Azlan, A.; Keprawi, M. F.; Malik, A. K. A.; Adamuddin, A.; Abdullah, A. H.; Shafie, A. M.

    2018-02-01

    This research allows local authorities to project road maintenance in term of activities and financial expenditure through pavement condition assessment and then Highway Development and Management (HDM-4) analysis. Current form of road maintenance carried out by local authority is on reactive manner where corrective actions were taken based on reports recorded. Some went unrecorded hence causing prolonged damages. This causes the local authority unable to project the required cost to maintain the roads. This affects the socio-economy of the surrounding routes. Hence, it is seen, as preventive maintenance of the roads will provide more feasible option in term of work force and finance to the local authority. To overcome this issue, a preventive model was introduced. This was done through pavement condition assessment (PCA) where analysis was done through HDM-4. Nondestructive test and destructive test were conducted in order to provide an indicator to the road's health. This were then analyzed in HDM-4 where the result was benchmarked with maintenance standard. The scope of this research is set to PCA where DT and NDT were performed on the routes of Petaling and the output is analyzed in HDM-4. The result of this research provides a 10 years forecast maintenance budget in maintaining the roads in Petaling. This allows the local authority to perform good practice in term of maintaining the roads while at the same time helps them in forecasting their budget for the upcoming years. This research will have a strong impact on the local socio-economy as well as local road user confidence towards the authority over good practices. This research can be further expanded to other type of roads as well as highway bridges.

  1. An expert system for steam generator maintenance

    International Nuclear Information System (INIS)

    Remond, A.

    1988-01-01

    The tube bundles in PWR steam generators are, by far, the major source of problems whether they are due to primary and secondary side corrosion mechanisms or to tube vibration-induced wear at tube support locations. Because of differences in SG operating, materials, and fabrication processes, the damage may differ from steam generator to steam generator. MPGV, an expert system for steam generator maintenance uses all steam generator data containing data on materials, fabrication processes, inservice inspection, and water chemistry. It has access to operational data for individual steam generators and contains models of possible degradation mechanisms. The objectives of the system are: · Diagnosing the most probable degradation mechanism or mechanisms by reviewing the entire steam generator history. · Identifying the tubes most exposed to future damage and evaluating the urgency of repair by simulating the probable development of the problem in time. · Establishing the appropriate preventive actions such as repair, inspection or other measures and establishing an action schedule. The system is intended for utilities either for individual plants before each inspection outage or any time an incident occurs or for a set of plants through a central MPGV center. (author)

  2. Application of the Theory of Reason Action for Preventing of Ecstasy Abuse among College Students

    Directory of Open Access Journals (Sweden)

    Majid Barati

    2009-08-01

    Full Text Available Introduction: The aim of the present study was assessed the effect of educational program for preventing of ecstasy abuse among college students in Hamadan based on Theory of Reason Action (TRA. Method: A quasi-experimental study carried out in college students. A total number of 140 students were selected through randomized cluster sampling and randomly assigned to the intervention (n=70 and the control (n=70 groups. Data-gathering tools consisted of a two-part questionnaire: Knowledge of ecstasy abuse consequences and one scale for measuring TRA variables. Respondents in the control and experimental groups completed questionnaires at before and two months after intervention. Results: The results showed that among constructs of the theory of reason action, subjective norms were better predictor of ecstasy abuse. There were significant differences between the scores of reason action constructs namely: attitude against drug abuse, subjective norms and intention of ecstasy abuse with consideration of group (witness and experimental. Conclusion: With regard to the results of the current study, special education based on Theory of Reasoned Action is effective in improving of attitude, subjective norm and behavioral intention of students. Therefore it is highly recommended that TRA education can be use for preventing of drug abuse education programs.

  3. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  4. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Smith, J. L.

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS)

  5. Development and Field Application Experience of the Reactor Internal Preventive Maintenance Technology

    International Nuclear Information System (INIS)

    Kanno, A.; Yoshikubo, F.; Morinaka, R.; Tanaka, M.; Hasegawa, K.; Hatou, H.

    2012-01-01

    A reactor internal preventive maintenance technology, Water Jet Peening (WJP), has been developed as a stress corrosion cracking (SCC) mitigation technology that has been successfully implemented during refuelling outages at 15 Boiling Water Reactors (BWR) and three (3) Advanced BWRs (during the site construction and in the shop fabrication) in Japan. WJP is one of the most successful underwater peening methods, which utilizes the energy generated from the collapsing of bubbles produced by the cavitating water jet nozzle. The energy produced from the cavitations introduces compressive residual stress on the metal surface and subsurface up to a depth of several hundred micrometers. Most recently, we have successfully applied WJP to the bottom head components and to some cracked areas on the shroud support in the Tokai-2 plant. In the case of the bottom head components, we produced inspection and repair tooling as a contingency in the event SCC was identified and would be required to be repaired prior to the implementation of WJP. (author)

  6. The Bayesian statistical decision theory applied to the optimization of generating set maintenance

    International Nuclear Information System (INIS)

    Procaccia, H.; Cordier, R.; Muller, S.

    1994-11-01

    The difficulty in RCM methodology is the allocation of a new periodicity of preventive maintenance on one equipment when a critical failure has been identified: until now this new allocation has been based on the engineer's judgment, and one must wait for a full cycle of feedback experience before to validate it. Statistical decision theory could be a more rational alternative for the optimization of preventive maintenance periodicity. This methodology has been applied to inspection and maintenance optimization of cylinders of diesel generator engines of 900 MW nuclear plants, and has shown that previous preventive maintenance periodicity can be extended. (authors). 8 refs., 5 figs

  7. The Surgeon General's Call to Action to Prevent and Reduce Underage Drinking, 2007

    Science.gov (United States)

    Powell, Patricia A., Ed.; Faden, Vivian B., Ed.; Wing, Stephen, Ed.

    2007-01-01

    This "Call to Action" serves as a reminder that underage drinking has serious social costs and tragic consequences, demonstrating the importance of prevention. Underage alcohol use is not inevitable, and schools, parents, and other adults are not powerless to stop it. The latest research demonstrates a compelling need to address alcohol use early,…

  8. Improvement of pressure ulcer prevention care in private for-profit residential care homes: an action research study.

    Science.gov (United States)

    Kwong, Enid Wy; Hung, Maria Sy; Woo, Kevin

    2016-11-25

    A need exits to develop a protocol for preventing pressure ulcers (PUs) in private for-profit nursing homes in Hong Kong, where the incidence of PUs is relatively high and which have high proportion of non-professional care staff. The implementation of such protocol would involve changes in the practice of care, likely evoking feelings of fear and uncertainty that may become a barrier to staff adherence. We thus adopted the Systems Model of Action Research in this study to manage the process of change for improving PU prevention care and to develop a pressure ulcer prevention protocol for private for-profit nursing homes. A total of 474 residents and care staff who were health workers, personal care workers, and/or nurses from four private, for-profit nursing homes in Hong Kong participated in this study. Three cyclic stages and steps, namely, unfreezing (planning), changing (action), and refreezing (results) were carried out. During each cycle, focus group interviews, field observations of the care staff's practices and inspections of the skin of the residents for pressure ulcers were conducted to evaluate the implementation of the protocol. Qualitative content analysis was adopted to analyse the data. The data and methodological triangulation used in this study increased the credibility and validity of the results. The following nine themes emerged from this study: prevention practices after the occurrence of PUs, the improper use of pressure ulcer prevention materials, non-compliance with several prevention practices, improper prevention practices, the perception that the preventive care was being performed correctly, inadequate readiness to use the risk assessment tool, an undesirable environment, the supplying of unfavorable resources, and various management styles in the homes with or without nurses. At the end of the third cycle, the changes that were identified included improved compliance with the revised risk assessment method, the timely and appropriate

  9. Psychological maintenance as an integrated approach to prevention and correction of professional burning out of the medical staff

    Directory of Open Access Journals (Sweden)

    V. S. Kucher

    2014-01-01

    Full Text Available The syndrome of professional burning out is a complex of symptoms and signs evidenced in various negative psychic conditions at individual, interpersonal and organizational levels. It is formed owing to a long mismatch between the requirements of the professional environment and the resources of the expert. Analysis of the preventive and correctional programs as a psychological assistance showed insufficiency of such approach. Creation of preventive and correctional programs within psychological maintenance from the position of involution of professional resources, taking into account the theoretical - methodological basis (the concept, the purposes, tasks, system approach, criteria of efficiency and the subjective-personal resources of counteraction directed at activization to burning out at all stages of professional development is progressive.

  10. [Parents' actions for prevention of arterial hypertension educational technology for health].

    Science.gov (United States)

    Santos, Zélia Maria de Sousa Araújo; Caetano, Joselany Afio; Moreira, Francisco Getúlio Alves

    2011-11-01

    This participatory research aimed to evaluate behavioral changes in fifteen parents of pre-school children to prevent the risk factors of arterial hypertension, by applying education technology for health that is based on the Health Beliefs Model at a private school in Fortaleza, State of Ceará, Brazil. The field research was carried out through educational workshops and data collection through questionnaires and interviews. After organizing the data into categories, analysis was based on the premises of health education. Through the application of education technology for health, significant changes were observed in the parents' habits, besides the roles they assumed as agents of change and multipliers of educational actions in the family. Although difficulties arose in the process of change, the parents were motivated to prevent the risk factors of arterial hypertension in themselves and their children. Thus, education technology for health based on the Health Beliefs Model proved to be efficient, as significant behavioral changes occurred and the parents were motivated to prevent arterial hypertension by means of a healthy lifestyle.

  11. Building and integrating reliability models in a Reliability-Centered-Maintenance approach

    International Nuclear Information System (INIS)

    Verite, B.; Villain, B.; Venturini, V.; Hugonnard, S.; Bryla, P.

    1998-03-01

    Electricite de France (EDF) has recently developed its OMF-Structures method, designed to optimize preventive maintenance of passive structures such as pipes and support, based on risk. In particular, reliability performances of components need to be determined; it is a two-step process, consisting of a qualitative sort followed by a quantitative evaluation, involving two types of models. Initially, degradation models are widely used to exclude some components from the field of preventive maintenance. The reliability of the remaining components is then evaluated by means of quantitative reliability models. The results are then included in a risk indicator that is used to directly optimize preventive maintenance tasks. (author)

  12. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  13. A knowledge-based assistant for valve maintenance planning

    International Nuclear Information System (INIS)

    Winter, M.J.; Danofsky, R.A.; Spinrad, B.I.; Howard, K.

    1987-01-01

    A knowledge-based program is being developed to assist engineers in maintenance planning for safety related, motor-operated valves at a boiling water reactor. The purpose of this project is to develop the general framework for a prototype system that demonstrates the capabilities for diagnosing valve symptoms and prescribing corrective maintenance, completing a portion of the Corrective Maintenance Action Request (CMAR) form which must be prepared for each job, and managing an interactive valve data base. Minimizing user input and providing output in a form that is familiar to the maintenance planning engineer are important goals for the program. This paper describes the present features of the valve maintenance advisory system which is currently being tested

  14. Action plan for 1965, Annex 2; Prilog br. 2 - Plan zadataka u 1965. godini

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-12-15

    Action plan presented in this annex includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building. [Serbo-Croat] Plan zadataka obuhvata aktivnosti masinske i elektro grupe na preventivnom odrzavanju i planskom remontu sistema teske vode, sistema tehnicke vode, sistema helijuma, centralnog tela reaktora, sistema grejanja i ventilacije, sistema za snabdevanje elektricnom energijom, i ostalih pomocnih sistema u zgradi reaktora RA.

  15. Virtual maintenance technology for reactor system based on PPR technology

    International Nuclear Information System (INIS)

    Wu Yaxiang; Ma Baiyong

    2009-01-01

    Based on the Product, Process and Resources (PPR) technology, the establishing technology of virtual maintenance environment for the reactor system and the process structure tree for virtual maintenance is studied, and the flow for the maintainability design and simulation for reactor system is put forward. Based on the subsection simulation of maintenance process and layered design of maintenance actions, the leveled structure of the reactor system virtual maintenance task is studied. The relation for the data of product, process and resource is described by Plan Evaluation and Review Technology (PERT) diagram to define the maintenance operation. (authors)

  16. Contract Service for School Maintenance

    Science.gov (United States)

    Modern Schools, 1976

    1976-01-01

    Preventive maintenance can extend useful equipment life in a school building and keep systems running more efficiently. Points to consider before selecting a comprehensive energy management package are listed. (Author/MLF)

  17. RXP-E: a connexin43-binding peptide that prevents action potential propagation block

    DEFF Research Database (Denmark)

    Lewandowski, Rebecca; Procida, Kristina; Vaidyanathan, Ravi

    2008-01-01

    . Separately, RXP-E was concatenated to a cytoplasmic transduction peptide (CTP) for cytoplasmic translocation (CTP-RXP-E). The effect of RXP-E on action potential propagation was assessed by high-resolution optical mapping in monolayers of neonatal rat ventricular myocytes, containing approximately 20......% of randomly distributed myofibroblasts. In contrast to control experiments, when heptanol (2 mmol/L) was added to the superfusate of monolayers loaded with CTP-RXP-E, action potential propagation was maintained, albeit at a slower velocity. Similarly, intracellular acidification (pH(i) 6.2) caused a loss...... of action potential propagation in control monolayers; however, propagation was maintained in CTP-RXP-E-treated cells, although at a slower rate. Patch-clamp experiments revealed that RXP-E did not prevent heptanol-induced block of sodium currents, nor did it alter voltage dependence or amplitude of Kir2...

  18. EDUCATIONAL ACTIONS TO PREVENT DENGUE: EXPERIENCES AND STRATEGIES WITH ELDERLY

    Directory of Open Access Journals (Sweden)

    Rosamaria Rodrigues Garcia

    2015-04-01

    Full Text Available Objective: Describe the activities performed on apublic specialized ambulatory care for dengue prevention among elderly. Case report: the epidemiological outlook of dengue is scaring being characterized as a public health problem. The elderly are most at risk for hospitalization and severe forms of the disease, thus health education activities are essential to improve awareness of the need to fight and prevent the disease. A Health Education project was created, evolving communication strategies to raise awareness on the issue. They were performed by a post graduate Gerontology group in activities such as interactive puppet show, myths and truths dynamic, informative folder, parody, posters, training seniors, caregivers and family members, internal and external health professionals, staff and residents of nearby long term care facilities. The materials were available in print and digital version. 2,500 elderly and 350 professionals were trained and encouraged to multiply the information and inspire adoption of preventive measures. The actions provided intergenerational interaction and empowerment of the elderly, whom trained, had the opportunity to exercise social participation and disseminate recommendations for other users. Conclusion: the project enabled the construction of knowledge through interactive educational activities that contributed to strengthen the individual and collective awareness, awareopinion leaderstothe importance of communication/education in the fight against dengue, which emphasized social responsibility in rescuing citizenship in a perspective thateach citizen is responsible for himself and for community. DESCRIPTORS: Dengue. Aged. Disease prevention. Health education.

  19. On the Use of Time-Limited Information for Maintenance Decision Support: A Predictive Approach under Maintenance Constraints

    Directory of Open Access Journals (Sweden)

    E. Khoury

    2013-01-01

    Full Text Available This paper deals with a gradually deteriorating system operating under an uncertain environment whose state is only known on a finite rolling horizon. As such, the system is subject to constraints. Maintenance actions can only be planned at imposed times called maintenance opportunities that are available on a limited visibility horizon. This system can, for example, be a commercial vehicle with a monitored critical component that can be maintained only in some specific workshops. Based on the considered system, we aim to use the monitoring data and the time-limited information for maintenance decision support in order to reduce its costs. We propose two predictive maintenance policies based, respectively, on cost and reliability criteria. Classical age-based and condition-based policies are considered as benchmarks. The performance assessment shows the value of the different types of information and the best way to use them in maintenance decision making.

  20. Environmental favourable foundries through maintenance activities

    Directory of Open Access Journals (Sweden)

    A. Saniuk

    2015-10-01

    Full Text Available Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help to reduce losses and thereby improve the efficiency of the processes used in the production of resources (e.g. raw materials, energy, etc., especially in areas such as: the choice of an appropriate strategy for the maintenance of machinery and equipment (e.g. reactive, preventive, proactive; inventory management of spare parts; lubrication management and management of technology media.

  1. Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Seyyed Mohammad Hassan Hosseini

    2016-05-01

    Full Text Available Scheduling problem for the hybrid flow shop scheduling problem (HFSP followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All machines can process all kinds of parts in this stage but each machine can process only one part at the same time. The second stage is a single assembly machine or a single assembly team of workers. The aim is to schedule the parts on the machines and assembly sequence and also determine when the preventive maintenance activities get done in order to minimize the completion time of all products (makespan. A mathematical modeling is presented and its validation is shown by solving an example in small scale. Since this problem has been proved strongly NP-hard, in order to solve the problem in medium and large scale, four heuristic algorithms is proposed based on the Johnson’s algorithm. The numerical experiments are used to run the mathematical model and evaluate the performance of the proposed algorithms.

  2. Efficiency of preventive actions for landslides and flooding - evaluation of Scandinavian practices

    Science.gov (United States)

    Bergman, R.; Andersson-sköld, Y. B.; Nyberg, L.; Johansson, M.; Persson, E.

    2011-12-01

    Author: Ramona Bergman, Yvonne Andersson-Sköld, Lars Nyberg, Magnus Johansson, Erik Persson Preventive actions can be, and are frequently, taken to reduce accidents and their consequences in different ways. The MSB funded research programme "Effects of Society's Security actions" (ESS, 2009-2013) aims to study the relationship between such actions and their effects. The program is divided into three subgroups: Frequent accidents Natural hazards (such as flooding, erosion and landslide) Chemical and landfill accidents The results presented here covers natural hazards with focus on land slides and flooding. The results are based on Swedish/Scandinavian contexts. Natural events such as erosion, flooding and land slides are common, but the number of accidents (events causing severe negative impact) is rare. Therefore, in such analysis there is limited data and other information available which can be used for example in statistical analysis of actions and their effects. Instead, the analysis must be based on other information. Therefore, the analysis may have to include aspects that only can be assessed by scenario and "what-if" analyses. In this project the main method has been interviews with officials in Swedish municipalities and national agencies in Sweden and Norway. The two levels are chosen since policies are taken on national (or international) level, while the key actions and actors are on the municipal level. The interviews cover experiences and potential scenarios. In all municipalities, one politician and officials working with planning and rescue service have been interviewed. The study covers hazard and risk mapping, follow up of such maps, physical planning and lessons learned from previous events and activities. The final outcome of the research will be a review of what is found to be well functioning, identification of weak points and recommendations for the management of landslides, erosion and flooding. The present results indicate that hazard

  3. Two-stage maintenance of a production system with exponentially distributed on and off-periods

    NARCIS (Netherlands)

    van Dijkhuizen, G.C.; van Harten, Aart

    1998-01-01

    We consider an on–off production system which is subject to failure during on-periods. In case of a failure, the production system is maintained correctively. In addition, preventive maintenance is carried out to prevent failures. The costs of both preventive and corrective maintenance are modelled

  4. Laboratory services series: a master-slave manipulator maintenance program

    International Nuclear Information System (INIS)

    Jenness, R.G.; Hicks, R.E.; Wicker, C.D.

    1976-12-01

    The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance

  5. A predictive maintenance approach for improved nuclear plant availability

    International Nuclear Information System (INIS)

    Verma, R.M.P.; Pandya, M.B.; Kini, M.P.

    1979-01-01

    Predictive maintenance programme as against preventive maintenance programme aims at diagnosing, inspecting, monitoring, and objective condition-checking of equipment. It helps in forecasting failures, and scheduling the optimal frequencies for overhauls, replacements, lubrication etc. It also helps in establishing work load, manpower, resource planning and inventory control. Various stages of predictive maintenance programme for a nuclear power plant are outlined. A partial list of instruments for predictive maintenance is given. (M.G.B.)

  6. Exploring maintenance policy selection using the Analytic Hierarchy Process : an application for naval ships

    NARCIS (Netherlands)

    Goossens, A.J.M.; Basten, R.J.I.

    2015-01-01

    In this paper we investigate maintenance policy selection (MPS) through the use of the Analytic Hierarchy Process (AHP). A maintenance policy is a policy that dictates which parameter triggers a maintenance action. In practice, selecting the right maintenance policy appears to be a difficult

  7. Diagnostics of heavy mining equipment during the scheduled preventive maintenance

    Science.gov (United States)

    Drygin, M. Yu; Kuryshkin, N. P.

    2018-01-01

    Intensification of production, economic globalization and dramatic downgrade of the workers’ professional skills lead to unacceptable technical state of heavy mining equipment. Equipment maintenance outage reaches 84 % of the total downtime, of which emergency maintenance takes up to 36 % of time, that excesses 429 hours per year fr one excavator. It is shown that yearly diagnostics using methods of non-destructive check allows to reduce emergency downtime by 47 %, and 55 % of revealed defects can be eliminated without breaking the technological cycle of the equipment.

  8. Road maintenance optimization through a discrete-time semi-Markov decision process

    International Nuclear Information System (INIS)

    Zhang Xueqing; Gao Hui

    2012-01-01

    Optimization models are necessary for efficient and cost-effective maintenance of a road network. In this regard, road deterioration is commonly modeled as a discrete-time Markov process such that an optimal maintenance policy can be obtained based on the Markov decision process, or as a renewal process such that an optimal maintenance policy can be obtained based on the renewal theory. However, the discrete-time Markov process cannot capture the real time at which the state transits while the renewal process considers only one state and one maintenance action. In this paper, road deterioration is modeled as a semi-Markov process in which the state transition has the Markov property and the holding time in each state is assumed to follow a discrete Weibull distribution. Based on this semi-Markov process, linear programming models are formulated for both infinite and finite planning horizons in order to derive optimal maintenance policies to minimize the life-cycle cost of a road network. A hypothetical road network is used to illustrate the application of the proposed optimization models. The results indicate that these linear programming models are practical for the maintenance of a road network having a large number of road segments and that they are convenient to incorporate various constraints on the decision process, for example, performance requirements and available budgets. Although the optimal maintenance policies obtained for the road network are randomized stationary policies, the extent of this randomness in decision making is limited. The maintenance actions are deterministic for most states and the randomness in selecting actions occurs only for a few states.

  9. The Effect of Health Education based on Health Belief Model on Preventive Actions of Synthetic Drugs Dependence in Male Students of Kerman, Iran

    Directory of Open Access Journals (Sweden)

    Seyed Saeed Mazloomy Mahmoodabad

    2017-06-01

    Conclusion: Findings indicated that by increase of HBM components' average scores, the average score of synthetic drug dependence preventive actions increased too. Therefore, results of the research confirm the effect and efficiency of HBM in making preventive actions of drug dependence. 

  10. MODELS CONCERNING PREVENTIVE VERIFICATION OF TECHNICAL EQUIPMENT

    Directory of Open Access Journals (Sweden)

    CÂRLAN M.

    2016-12-01

    Full Text Available The paper presents three operative models whose purpose is to improve the practice of preventive maintenance to a wide range of technical installations. Although the calculation criteria are different, the goal is the same: to determine the optimum time between two consecutive preventive interventions. The optimum criteria of these models are: - the maximum share of technical entity operating probabilities, in the case of the Ackoff - Sasieni [1] method; -the optimum time interval for preventive verification depending on the preventive-corrective maintenance costs imposed by the deciding factor, for the AsturioBaldin [2] model; - the minimum number of renewals – preventive and/or corrective maintenance operations [3

  11. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  12. 9 CFR 416.14 - Maintenance of Sanitation SOP's.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Maintenance of Sanitation SOP's. 416... ACT SANITATION § 416.14 Maintenance of Sanitation SOP's. Each official establishment shall routinely evaluate the effectiveness of the Sanitation SOP's and the procedures therein in preventing direct...

  13. Research on Application of FMECA in Missile Equipment Maintenance Decision

    Science.gov (United States)

    Kun, Wang

    2018-03-01

    Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.

  14. Strategies for the Management of Built Heritage Linked to Maintenance and Monitoring. Case Study of the San Roque Neighborhood, Cuenca, Ecuador

    Science.gov (United States)

    Achig-Balarezo, M. C.; Vázquez, L.; Barsallo, M. G.; Briones, J. C.; Amaya, J.

    2017-10-01

    The rehabilitation of heritage sites, as well as the implementation of monitoring and control strategies is fundamental for its conservation. In the case of Cuenca, a World Heritage City, a maintenance campaign in the traditional neighborhood of San Roque was carried out in 2014. The objective was to undertake maintenance actions on roofs and façades as well as on elements at risk. The campaign process was developed keeping in mind the cycle or phases of preventive conservation: anamnesis, diagnosis, therapy and control (ICOMOS, 2003). At the end of the maintenance campaign an impact assessment was undertaken and monitoring tools were handed out to the community in order to strengthen the citizen participation in the preservation of built heritage. The experience of the maintenance campaign unveiled a series of lessons that have been evaluated in the present investigation, being the main objective the strengthening of the processes of governance and documentation through the formulation of strategies inherent to the maintenance of heritage buildings. In this process it is shown that the participation of citizens is a strategic factor for the sustainable development of maintenance campaigns, which allow for the preservation of historical sites for future generations.

  15. A Simulation Model for Machine Efficiency Improvement Using Reliability Centered Maintenance: Case Study of Semiconductor Factory

    Directory of Open Access Journals (Sweden)

    Srisawat Supsomboon

    2014-01-01

    Full Text Available The purpose of this study was to increase the quality of product by focusing on the machine efficiency improvement. The principle of the reliability centered maintenance (RCM was applied to increase the machine reliability. The objective was to create preventive maintenance plan under reliability centered maintenance method and to reduce defects. The study target was set to reduce the Lead PPM for a test machine by simulating the proposed preventive maintenance plan. The simulation optimization approach based on evolutionary algorithms was employed for the preventive maintenance technique selection process to select the PM interval that gave the best total cost and Lead PPM values. The research methodology includes procedures such as following the priority of critical components in test machine, analyzing the damage and risk level by using Failure Mode and Effects Analysis (FMEA, calculating the suitable replacement period through reliability estimation, and optimizing the preventive maintenance plan. From the result of the study it is shown that the Lead PPM of test machine can be reduced. The cost of preventive maintenance, cost of good product, and cost of lost product were decreased.

  16. Navy Ship Maintenance: Action Needed to Maximize New Contracting Strategys Potential Benefits

    Science.gov (United States)

    2016-11-01

    implementation of the new strategy, the Navy conducted market research and pilot-tested attributes of the strategy with pilot maintenance periods for a...readiness strategy and, in 2015, introduction of a new contracting strategy for ship repair, referred to as MAC-MO. House Report 114-102 accompanying the...Maintenance Letter 1 Background 3 Market Research and Piloting Helped Inform Roll-out of MAC-MO Strategy, Which Offers Potential Benefits

  17. Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-04-01

    Full Text Available This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maintenance cost as the increase of production run length. The production run length is a time bucket between two consecutive preventive maintenance activities. The objective function of the model is to minimize total cost consisting of in process and completed part inventory costs, setup cost, preventive and corrective maintenance costs and rework cost. The problem is to determine the optimal production run length and to schedule the batches obtained from determining the production run length in order to minimize total cost.

  18. Discounted cost model for condition-based maintenance optimization

    International Nuclear Information System (INIS)

    Weide, J.A.M. van der; Pandey, M.D.; Noortwijk, J.M. van

    2010-01-01

    This paper presents methods to evaluate the reliability and optimize the maintenance of engineering systems that are damaged by shocks or transients arriving randomly in time and overall degradation is modeled as a cumulative stochastic point process. The paper presents a conceptually clear and comprehensive derivation of formulas for computing the discounted cost associated with a maintenance policy combining both condition-based and age-based criteria for preventive maintenance. The proposed discounted cost model provides a more realistic basis for optimizing the maintenance policies than those based on the asymptotic, non-discounted cost rate criterion.

  19. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  20. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  1. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  2. Improvement of pressure ulcer prevention care in private for-profit residential care homes: an action research study

    Directory of Open Access Journals (Sweden)

    Enid WY Kwong

    2016-11-01

    Full Text Available Abstract Background A need exits to develop a protocol for preventing pressure ulcers (PUs in private for-profit nursing homes in Hong Kong, where the incidence of PUs is relatively high and which have high proportion of non-professional care staff. The implementation of such protocol would involve changes in the practice of care, likely evoking feelings of fear and uncertainty that may become a barrier to staff adherence. We thus adopted the Systems Model of Action Research in this study to manage the process of change for improving PU prevention care and to develop a pressure ulcer prevention protocol for private for-profit nursing homes. Methods A total of 474 residents and care staff who were health workers, personal care workers, and/or nurses from four private, for-profit nursing homes in Hong Kong participated in this study. Three cyclic stages and steps, namely, unfreezing (planning, changing (action, and refreezing (results were carried out. During each cycle, focus group interviews, field observations of the care staff’s practices and inspections of the skin of the residents for pressure ulcers were conducted to evaluate the implementation of the protocol. Qualitative content analysis was adopted to analyse the data. The data and methodological triangulation used in this study increased the credibility and validity of the results. Results The following nine themes emerged from this study: prevention practices after the occurrence of PUs, the improper use of pressure ulcer prevention materials, non-compliance with several prevention practices, improper prevention practices, the perception that the preventive care was being performed correctly, inadequate readiness to use the risk assessment tool, an undesirable environment, the supplying of unfavorable resources, and various management styles in the homes with or without nurses. At the end of the third cycle, the changes that were identified included improved compliance with the

  3. A development of maintenance educational support method by using navigation method Pt. 4. A development of a paper prototype system for the RHR pump maintenance educational support

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo; Tsumura, Joji

    2004-01-01

    This research establishes the new maintenance educational support prototype system for aiming at organization as Trinity (a supervision person, a construction person in charge, a work person in charge, and group length), and improvement in human reliability for the purpose of aiming at before hand prevention of a systematic error, human error, and the accident and a trouble. (1) This maintenance educational support: system made educational start to the educational end the structure navigated exactly, carrying out the exchange with a data base along with the road map which divided action (act) of the work process and worker concerning RHR pump maintenance work for a participant etc. by class. (2) First, according to a participant's attribute, this educational support system performs educational support (a question and reply) concerning an organization and organization, and judges knowledge and a nature type based on the result. Furthermore, educational support (a question and reply) concerning maintenance work is performed, and a knowledge level is judged based on the result. And it considered as the structure which performs the comprehensive judgment about an organization, organization, and the educational effect concerning maintenance work at the last. (3) The judgment pattern of the knowledge and nature after the educational support end concerning a participant's organization and organization was made into four kinds which consist of (1) organization priority and duty A type, (2) organization priority and an adaptable type, (3) individual priority and an adaptable type, and (4) individual priority and a duty priority type. (4) The judgment pattern of the knowledge level after the educational support end concerning maintenance work of a participant was used as three kinds of evaluation axes, schedule management, apparatus reliability capability, and human-being reliability. (author)

  4. Effect of gender on awareness of cardiovascular risk factors, preventive action taken, and barriers to cardiovascular health in a group of Austrian subjects.

    Science.gov (United States)

    Haidinger, Teresa; Zweimüller, Martin; Stütz, Lena; Demir, Dondue; Kaider, Alexandra; Strametz-Juranek, Jeanette

    2012-04-01

    The incidence of cardiovascular disease (CVD) is increasing in industrialized countries. Preventive action is an important factor in minimizing CVD-associated morbidity and mortality. However, it is not known whether gender differences affect CVD or risk factor awareness influencing self-assessment of personal risk and preventive action. This study was performed to assess individual CVD and risk factor awareness, preventive action taken, and barriers to cardiovascular health. The study included 573 women and 336 men, randomly chosen to complete an anonymous questionnaire to assess individual CVD and risk factor awareness, preventive action taken, and barriers to cardiovascular health. The data were analyzed using SAS software. Cardiovascular disease was identified in 75% of patients, in both sexes, as the leading cause of death; however, both groups showed significant lack of knowledge about CVD risk factors. Type 2 diabetes was identified correctly in only 27.5%. Preventive action was linked more often to family members in 66.5% of women and 62.8% of men. The primary barrier to cardiovascular health in adults was incorrect assessment of personal CVD risk. More than half of female respondents (56.4%) and male respondents (52.7%) underestimated their risk of CVD. Knowledge about risk factors for CVD needs to be improved in members of both sexes. Because women, in particular, have difficulty in correctly assessing their personal CVD risk, future education programs are warranted to inform both women and men about CVD and its risk factors, thereby helping them to correctly assess their individual risk. However, greater effort is needed to inform men, compared with women, about the various ways in which to prevent CVD and to motivate them to take preventive action. Copyright © 2012 Elsevier HS Journals, Inc. All rights reserved.

  5. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  6. The human factor in maintenance work

    International Nuclear Information System (INIS)

    Hansson, B.

    1996-01-01

    In most of the maintenance works performed at operating plants, the personnel is the warranty for both efficient performance and good quality. To reach the right quality level in performance, the personnel needs adequate tools and of course a maintenance strategy and an organisation that supports the efficient work. The human factor is mostly referred to when something went wrong and analyses are done. There is a great potential of doing preventive analysis. The presentation will focus on experience in this field and what has been done at Barsebaeck NPP to analyse and improve the maintenance work. As maintenance work can't be seen as an isolated area, the rest of the plant organisation is included in the presentation. (author) figs., tabs

  7. Maintenance Implementation Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Stark, T.E.

    1992-10-01

    This Maintenance Implementation Plan (MIP) has been developed for the 222-S Laboratory at Hanford. It is based on assessments of the existing maintenance program to the requirements specified by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II, Change 3. The results of these assessments were evaluated to determine corrective actions required. The 222-S Laboratory is currently supporting the waste management, chemical processing, and environmental monitoring programs presently under Westinghouse Hanford Company (Westinghouse Hanford) responsibility. This is done through quality analytical and process chemistry services

  8. Oak Ridge Research Reactor shutdown maintenance and surveillance

    International Nuclear Information System (INIS)

    Coleman, G.H.; Laughlin, D.L.

    1990-10-01

    The Department of Energy ordered the Oak Ridge Research Center Reactor to be placed in permanent shutdown on July 14, 1987. Maintenance activities, both mechanical and instrument, were essentially routine in nature. The performance of the instrumentation for the facility was satisfactory, and maintenance required is provided. The performance of the process system was satisfactory, and maintenance required is indicated. The results of efficiency tests of the various gaseous-waste filters have been summarized and preparations for transfer of the facility to the remedial action program is also indicated

  9. The review of online maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    Yamamoto, Tetsuya

    2009-01-01

    The Nuclear and Industrial Safety Agency (NISA) has begun the review of online maintenance in nuclear power plants in its advisory committee. The experts in the committee study the necessary actions in the regulation and safe and secure measure to implement the online maintenance. This paper explains the current progress of the review. (author)

  10. Evaluation and analysis of emergency maintenance due by third party action's, formulation and execution of contingency plans

    Energy Technology Data Exchange (ETDEWEB)

    Torres Vega, Raul; Nunez Ribera, Gary [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2009-07-01

    In September 2008, in the Yacuiba - Rio Grande Gas Pipeline (GASYRG) located in the south of Bolivia, atypical situations took place. Due to the political events and the social mobilizations in which the country was, a series of third party actions developed putting in risk the facilities of the gas pipeline. These actions resulted in the rupture of a 1 inch instrumentation pipe, causing a leak witch some time caught fire and caused an interruption of the transportation service in that section of the pipeline, later on, another action derived in safety valve shut down causing a total pipeline shut down. In addition to these events we experience a fuel shortage, road blocks and a telephone communication system failure. In spite of these obstacles the maintenance activities were realized and emergency repairs put back in operating conditions the gas pipeline, task that was accomplished in a very short time, taking in account the situation. Later analysis, including all the adverse elements of the situation, result in the adoption of a series of measures and plans directed to mitigate the risk associated to this type of events, such as Mutual Aid Plans with fellow companies and institutions, fortification of the patrimonial security, stock material handling for emergency repairs, etc. (author)

  11. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  12. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  13. Maintenance rule: a system to guarantee maintenance effectiveness

    International Nuclear Information System (INIS)

    Torralbo, J.R.

    1995-01-01

    In the last few years, maintenance activities in nuclear plants have been given prime attention in view of their repercussion on the performance of such plants. One of the results of that attention is a new rule published in the U.S. known as M aintenance Rule . The paper describes the philosophy and main guidelines of the new regulation, and presents the procedure brought into action by the nuclear industry in Spain so to make their application contribute to a real improvement of safety and performance in nuclear plants. (Author)

  14. 78 FR 26383 - Environmental Assessment of the Proposed Increase in Operation, Maintenance and Replacement...

    Science.gov (United States)

    2013-05-06

    ... Proposed Increase in Operation, Maintenance and Replacement Activities Associated With the Wasatch County... of potential impacts associated with a proposed change in Operation, Maintenance and Replacement..., Maintenance, and Replacement Proposed Action includes: stabilizing canal banks; lining, piping, or enclosing...

  15. Evaluation and comparison of alternative fleet-level selective maintenance models

    International Nuclear Information System (INIS)

    Schneider, Kellie; Richard Cassady, C.

    2015-01-01

    Fleet-level selective maintenance refers to the process of identifying the subset of maintenance actions to perform on a fleet of repairable systems when the maintenance resources allocated to the fleet are insufficient for performing all desirable maintenance actions. The original fleet-level selective maintenance model is designed to maximize the probability that all missions in a future set are completed successfully. We extend this model in several ways. First, we consider a cost-based optimization model and show that a special case of this model maximizes the expected value of the number of successful missions in the future set. We also consider the situation in which one or more of the future missions may be canceled. These models and the original fleet-level selective maintenance optimization models are nonlinear. Therefore, we also consider an alternative model in which the objective function can be linearized. We show that the alternative model is a good approximation to the other models. - Highlights: • Investigate nonlinear fleet-level selective maintenance optimization models. • A cost based model is used to maximize the expected number of successful missions. • Another model is allowed to cancel missions if reliability is sufficiently low. • An alternative model has an objective function that can be linearized. • We show that the alternative model is a good approximation to the other models

  16. Filling machine preventive maintenance using age replacement method in PT Lucas Djaja

    Directory of Open Access Journals (Sweden)

    Mustofa Fifi Herni

    2018-01-01

    Full Text Available PT Lucas Djaja is a company engaged in the pharmaceutical industry which produce sterile drugs and non-sterile. Filling machine has a high failure rate and expensive corrective maintenance cost. PT Lucas Djaja has a policy to perform engine maintenance by way of corrective maintenance. The study focused on the critical components, namely bearing R2, bearing 625 and bearing 626. When the replacement of the failure done by the company is currently using the formula mean time to failure with the result of bearing R2 at point 165 days, bearing 625 at a point 205 days, and bearing 626 at a point 182 days. Solutions generated by using age replacement method with minimization of total maintenance cost given on the bearing R2 at a point 60 days, bearing 625 at the point of 80 days and bearing 626 at a point 40 days.

  17. A VITAL service for predictive MOV maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Motor-operated valve (MOV) maintenance can be a major contributor to unplanned plant downtime, either because valve malfunctions cause unscheduled outages, or because unnecessary valve maintenance lengthens scheduled outages. The cause of both situations is a preventive approach to valve maintenance, where maintenance is scheduled according to a timetable instead of according to a demonstrated need. To move towards a predictive maintenance approach, inexpensive methods of collecting and diagnosing real-time data on the conditions of a valve must be made available. Such a system must be capable of detecting and diagnosing degrading mechanical and electrical behaviour at an early stage, as well as being able to predict the time of failure. Without this data, a predictive approach to maintenance is impossible. Westinghouse is addressing the requirements for a predictive approach to MOV maintenance with the introduction of a third-generation of diagnostic systems for motor-operated valves -the portable Valve Intelligent Test and Analysis System (VITALS) and the on-line Valve Monitoring System (VMS). (author)

  18. Maintenance Optimization of High Voltage Substation Model

    Directory of Open Access Journals (Sweden)

    Radim Bris

    2008-01-01

    Full Text Available The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized, the failure rate and mean time to repair - MTTR.

  19. Improvement of the preventive maintenance program of an emergency diesel generator set

    International Nuclear Information System (INIS)

    Jacquot, J.P.; Meuwisse, C.; Cailleaux, J.P.

    1995-01-01

    An exhaustive Reliability Centered Maintenance (RCM) analysis was performed of the emergency diesel generator sets in Electricite de France 900-MW nuclear power plants. The first part of this paper describes the Reliability Centered Maintenance approach, including the functional breakdown, complete analysis of operation feedback and safety assessment of the risk induced by functional diesel failures. The second part shows how this kind of RCM analysis can be used to improve the efficiency of periodic tests of the machine, and more generally, the efficiency of condition-directed maintenance tasks. The underlying objective is to minimize risk and aging of the machine

  20. A development of maintenance educational support method by using navigation method. Pt. 3. A detal design of RHR pump maintenance educational support prototype system

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo; Tsumura, Joji

    2003-01-01

    This research establishes the new maintenance educational support prototype system for aiming at organization as Trinity (a supervision person, a construction person in charge, a work person in charge, and group length), and improvement in human reliability for the purpose of aiming at before hand prevention of a systematic error, human error, and the accident and a trouble. Main results: (1) This paper prototype system acquired a participant data by the input of 'position and rank' etc. of a participant, and was taken as the structure which navigates the participant exactly from the start of RHR pump maintenance work to the end on the basis of the data (question etc.) while performing reeducation based on the reply of an organization, organization, and the participant to the structure-ized question in connection with on-site work, judging, and the judgment result etc. by the system. (2) RHR pump maintenance work has the complicated hierarchy. Then, in order to raise the study effect of the participant about maintenance education, it considered as the structure as which that a participant does what study, further to which process a participant next progresses in which protion of the whole maintenance process a participant is and etc. A participant can always keep regarding the whole study in connection with maintenance education (Fig. 2). (3) This paper prototype system was taken as the structure which shows clearly a participant special feature, weak point, etc., by plotting an organization, organization, and the reply result of the subject of the question completion before in connection with on-site work, and after completion on the same screen. (4) This paper prototype system Judge how changed a participant action pattern's completion front, and after completion. For example, from the organization neglect/duty neglect type before completion, after completion specifies having changed to the organization/duty serious-consideration type, further, is adding the

  1. Optimal Maintenance of a Production System with Intermediate Buffers

    Directory of Open Access Journals (Sweden)

    Constantinos C. Karamatsoukis

    2012-01-01

    Full Text Available We consider a production-inventory system that consists of an input-generating installation, a production unit and L intermediate buffers. It is assumed that the installation transfers the raw material to buffer and the production unit pulls the raw material from buffer We consider the problem of the optimal preventive maintenance of the installation if the installation deteriorates stochastically with usage and the production unit is always in operative condition. We also consider the problem of the optimal preventive maintenance of the production unit if the production unit deteriorates stochastically with usage and the installation is always in operative condition. Under a suitable cost structure and for given contents of the buffers, it is proved that the average-cost optimal policy for the first (second problem initiates a preventive maintenance of the installation (production unit if and only if the degree of deterioration of the installation (production unit exceeds some critical level. Numerical results are presented for both problems.

  2. Mathematical thinking of maintenance. Problem setting and solving bases

    International Nuclear Information System (INIS)

    2007-01-01

    Plant or mechanical facility for maintenance became more complicated than before and consisted of many subsystems made of various equipments or facilities with parts, which were a system having complicated and hierarchical structure. Maintenance was required to be properly implemented to assure reliability of a system for a long period so as for each equipment to play a specified role for a stable operation of plant. Mathematical thinking using probability theory was rational to optimize maintenance action with failure rate function of system or part of equipment. Reliability function, maintainability function and availability of plant and equipment were defined. Unreliability function was called failure time distribution function (F(t)) and failure rate function (λ(t)) was defined as the ratio of failure time density distribution function (dF(t)/dt) to reliability function (1-F(t)). λ(t) could be expressed as a simple equation with Weibull parameter. Availability at steady state was attributed to ratio of average operating time to sum of operating time and maintenance time, i.e. MTBF/(MTBF+MTTR) where MTBF was mean time between failures and MTTR was mean time to repair. Optimization of system risk and maintenance action was encouraged using computational science simulating material degradation. (T. Tanaka)

  3. Stochastic maintenance optimization at Candu power plants

    International Nuclear Information System (INIS)

    Doyle, E.K.; Duchesne, T.; Lee, C.G.; Cho, D.I.

    2004-01-01

    The use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems as previously reported at ICONE 6 in New Orleans (1996). Further refinement of the station maintenance strategy was evaluated via the applicability of statistical analysis of historical failure data. The viability of stochastic methods in Candu maintenance was illustrated at ICONE 10 in Washington DC (2002). The next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principal impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. The current reality of global competition necessitates the pursuit of all financial optimizers. The next construction phase in the power generation industry will soon begin on a worldwide basis. With the relatively high initial capital cost of new nuclear generation all possible avenues of financial optimization must be evaluated and implemented. (authors)

  4. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  5. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  6. Evaluation of implementation an Integrated Safety and Preventive Maintenance System for Improving of Safety Indexes

    Directory of Open Access Journals (Sweden)

    I mohammadfam

    2014-03-01

    Full Text Available Accident analysis shows that one of the main reasons for accidents is non-integration of maintenance units with safety. Merging these two processes through an integrated system can reduce and or eliminate accidents, diseases, and environmental pollution. These issues lead to improvement in organizational performance, as well. The aim of this study is to design and establish an integrated system for obtaining the aforementioned goal. Integration was carried out at Nirou Moharreke Machine Tools Company via Structured System Analysis & Design Method (SSADM. In order to measure the effectiveness of the system, selected indexes were compared using statistical methods prior and after system establishment. Results show that the accident severity index reduced from 135.46 in 2010, to 43.85 in 2012. Moreover, system effectiveness improved equipment reliability and availability (e.g. reliability of the Pfeiffer Milling machine (P (t>50 increased from 0.89 in 2010, to 0.9 in 2012. This system by forecasting various failures, and planning and designing the required operations for preventing occurrence of these failures, plays an important role in improving safety conditions of equipment, and increasing organizational performance, and is capable of presenting an excellent accident prevention program.

  7. Applying principles of Design For Assembly to ITER maintenance operations

    International Nuclear Information System (INIS)

    Heemskerk, Cock; de Baar, Marco; Elzendoorn, Ben; Koning, Jarich; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    In ITER, maintenance operations in the vessel and in the Hot Cell will be largely done by Remote Handling (RH). Remotely performed maintenance actions tend to be more time-costly than actions performed by direct human access. With a human operator in the control loop and adequate situational feedback, a two-armed master slave manipulator system can mimic direct access with dexterous manipulation, tactile feedback and vision. But even then, turnaround times are still very high. Adapting the design for simplified maintenance operations can yield significant time savings. One of the methods known to produce a simpler, more robust design, which is also better suited for handling with robots, is Design For Assembly (DFA). This paper discusses whether and how the principles of DFA can be applied to simplify maintenance operations for ITER. While DFA is normally used with series-production and ITER is a unique product, it is possible to apply the principles of DFA to ITER maintenance operations. Furthermore, DFA's principles can be applied at different abstraction levels. Combining principles of DFA with Virtual Reality leads to new insights and provides additional value.

  8. On Different Maintenance Strategies for Casted Components of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    . This maintenance tool uses Crude Monte Carlo Simulations to estimate the expected maintenance costs. Corrective and preventive maintenance strategies with a constant inspection interval or a condition monitoring system are considered. Furthermore, transportation from shore to the wind turbines by boat...... and transportation strategy. The case study shows that the maintenance expenses of casted components correspond to roughly 5% of the overall expected maintenance costs when using a corrective maintenance strategy. This amount can be decreased to roughly 2% when using a condition monitoring system and following...

  9. On maintenance management of wind and nuclear power plants

    International Nuclear Information System (INIS)

    Nilsson, Julia

    2009-11-01

    Electrical production in Sweden today is mainly from nuclear and hydro power. However, there is large increase in renewable energy like wind power and the installed new capacity goals are large. Several electrical production sources are important for the sustainability of the energy system. Maintenance is an approach for keeping a system sustainable. The importance of structured maintenance for reliable electrical production systems triggers the development of qualitative and quantitative maintenance management methods. Examples of these methods are Reliability-Centered Maintenance (RCM) which is a structured qualitative approach that focuses on reliability when planning maintenance, and Reliability Centered Asset Management (RCAM) which is a development of RCM into a quantitative approach with the aim to relate preventive maintenance to total maintenance cost and system reliability. This thesis presents models, as applications of RCAM, based on the methods of Life Cycle Cost (LCC) and mathematical optimization, applied to wind and nuclear power plants. Both deterministic and stochastic approaches have been used and the proposed models are based on the Total Cost model, which summarizes costs for maintenance and production loss, and the Aircraft model, which is an opportunistic maintenance optimization model. Opportunistic maintenance is preventive maintenance performed at opportunities. The wind power applications in this study show on different ways to cover costs of condition monitoring systems (CMS) and further on economic benefits of these when uncertainties of times to failure are included in the model. The nuclear power applications show on that the optimization model is dependent on the discount rate and that a high discount rate gives more motivation for opportunistic replacements. When put into a stochastic framework and compared to other maintenance strategies it is shown that an extended opportunistic maintenance optimization model has a good overall

  10. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  11. Selective maintenance of multi-state systems with structural dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.

    2017-01-01

    This paper studies the selective maintenance problem for multi-state systems with structural dependence. Each component can be in one of multiple working levels and several maintenance actions are possible to a component in a maintenance break. The components structurally form multiple hierarchical levels and dependence groups. A directed graph is used to represent the precedence relations of components in the system. A selective maintenance optimization model is developed to maximize the system reliability in the next mission under time and cost constraints. A backward search algorithm is used to determine the assembly sequence for a selective maintenance scenario. The maintenance model helps maintenance managers in determining the best combination of maintenance activities to maximize the probability of successfully completing the next mission. Examples showing the use of the proposed method are presented. - Highlights: • A selective maintenance model for multi-state systems is proposed considering both economic and structural dependence. • Structural dependence is modeled as precedence relationship when disassembling components for maintenance. • Resources for disassembly and maintenance are evaluated using a backward search algorithm. • Maintenance strategies with and without structural dependence are analyzed. • Ignoring structural dependence may lead to over-estimation of system reliability.

  12. Using Action Research to prevent work-related illness among rubber farmers in Northeastern Thailand.

    Science.gov (United States)

    Sena, Wijitra; Nilvarangkul, Kessarawan; Saranrittichai, Kesinee; Smith, John F; Phajan, Teerasak; Seetangkham, Sansanee

    2018-06-10

    This research aimed to enhance self-care among rubber farmers for preventing work-related illness. The project used Action Research's four phase iterative process: fact-finding to understand the problems, action planning, action plan implementation, and evaluation and reflection on action plan impacts. Sixty-six participants (46 rubber farmers and 20 community stakeholders) were purposively recruited from two villages in the top 10 rubber producing provinces in Northeastern Thailand. Demographic and work-related illness data were collected in face-to-face structured interviews, Focus group interviews and participant observations were used to collect data in each project phase. Night group meetings were held throughout the research phases. The intervention included training workshops and establishing a community health education team for ongoing farmer support. Results showed improved farmer self-care behaviors and establishment of a community health education team to encourage farmers to care for themselves properly. Community nurses, other health personnel, and the Thai government can build on initiatives like this to strengthen occupational health and safety practices and services policy for rubber farmers. © 2018 Wiley Periodicals, Inc.

  13. Integration of infrared thermography into various maintenance methodologies

    Science.gov (United States)

    Morgan, William T.

    1993-04-01

    Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.

  14. Identification of Optimal Preventive Maintenance Decisions for Composite Components

    NARCIS (Netherlands)

    Laks, P.; Verhagen, W.J.C.; Gherman, B.; Porumbel, I.

    2018-01-01

    This research proposes a decision support tool which identifies cost-optimal maintenance decisions for a given planning period. Simultaneously, the reliability state of the component is kept at or below a given reliability threshold: a failure limit policy applies. The tool is developed to support

  15. THE OFFICIAL AUDIT: THE MAINTENANCE OF THE STRUCTURES AND EQUIPMENTS

    Directory of Open Access Journals (Sweden)

    Claudio Biglia

    2008-12-01

    Full Text Available The author distinguishes the ordinary maintenance in corrective, preventive and predictive maintenance and describes the importance of the verifications of the maintenance procedures of the structures and the equipmentes in the food industy. He individualizes criterions to follow for an aware detective check. This approach offers a greater guarantee of food security and a greater responsibility of OSA

  16. Optimal policies for cumulative damage models with maintenance last and first

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Qian, Cunhua; Nakagawa, Toshio

    2013-01-01

    From the economical viewpoint of several combined PM policies in reliability theory, this paper takes up a standard cumulative damage model in which the notion of maintenance last is applied, i.e., the unit undergoes preventive maintenances before failure at a planned time T, at a damage level Z, or at a shock number N, whichever occurs last. Expected cost rates are detailedly formulated, and optimal problems of two alternative policies which combine time-based with condition-based preventive maintenances are discussed, i.e., optimal T L ⁎ for N, Z L ⁎ for T, and N L ⁎ for T are rigorously obtained. Comparison methods between such maintenance last and conventional maintenance first are explored. It is determined theoretically and numerically which policy should be adopted, according to the different methods in different cases when the time-based or the condition-based PM policy is optimized.

  17. Heel pressure ulcer, prevention and predictors during the care delivery chain - when and where to take action? A descriptive and explorative study.

    Science.gov (United States)

    Muntlin Athlin, Åsa; Engström, Maria; Gunningberg, Lena; Bååth, Carina

    2016-11-14

    Hazardous healthcare settings, for example acute care, need to focus more on preventing adverse events and preventive actions across the care delivery chain (i.e pre-hospital and emergency care, and further at the hospital ward) should be more studied. Pressure ulcer prevalence is still at unreasonably high levels, causing increased healthcare costs and suffering for patients. Recent biomedical research reveals that the first signs of cell damage could arise within minutes. However, few studies have investigated optimal pressure ulcer prevention in the initial stage of the care process, e.g. in the ambulance care or at the emergency department. The aim of the study was to describe heel pressure ulcer prevalence and nursing actions in relation to pressure ulcer prevention during the care delivery chain, for older patients with neurological symptoms or reduced general condition. Another aim was to investigate early predictors for the development of heel pressure ulcer during the care delivery chain. Existing data collected from a multi-centre randomized controlled trial investigating the effect of using a heel prevention boot to reduce the incidence of heel pressure ulcer across the care delivery chain was used. Totally 183 patients participated. The settings for the study were five ambulance stations, two emergency departments and 16 wards at two hospitals in Sweden. A total of 39 individual patients (21 %) developed heel pressure ulcer at different stages across the care delivery chain. Findings revealed that 47-64 % of the patients were assessed as being at risk for developing heel pressure ulcer. Preventive action was taken. However, all patients who developed pressure ulcer during the care delivery chain did not receive adequate pressure ulcer prevention actions during their hospital stay. In the ambulance and at the emergency department, skin inspection seems to be appropriate for preventing pressure ulcer. However, carrying out risk assessment with a validated

  18. Improving industrial maintenance contract relationships

    NARCIS (Netherlands)

    De Jong, A.

    2010-01-01

    Unavailability of technical systems, such as aircraft, is expensive. Technical systems require maintenance to prevent and to remedy defects that cause unavailability. Users of technical systems usually bear the consequences of the risk of unavailability, in particular the loss of productivity. This

  19. A development of maintenance educational support method by using navigation method. Pt. 1. A conceptual design of RHR pump maintenance educational support prototype system

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo; Gouda, Hidenori

    2001-01-01

    The purpose of this research is before hand prevention of the systematic error produced from the fault of command / command system on the different organization in a nuclear power plant, and the individual error of the demand level of maintenance work, and knowledge and experience level of a maintenance worker produced from it being incongruent (mismatch), and generating of the serious accident and a serious trouble. This research attains optimization with the difficulty of maintenance work, and work execution capability, such as the persons concerned (a supervision person, a construction person, work person), and proposes the new 'maintenance educational support technique' which is useful to the improvement in 'work reliability' and 'before hand prevention of a human error' in the maintenance work spot. The main results concerning this research are shown below. (1) In this research, concept design of RHR pump maintenance work educational support prototype system was performed on the basis of the examination result of a process analysis of RHR pump maintenance work, load mapping, a rule base/knowledge base and a data base/filing system. Consequently, when an educator-ed talked with a data base/filing system along with load mapping of maintenance work (Why, How, What), a possibility that it could reach exactly from work start to the sub goal or the last goal and timely was suggested. (2) As a result of classifying 'the difficulty of maintenance work', and man's work execution capability' and comparing the result using SRK (behavior of human) index which Rasmussen proposed, among both, it turns out that difference (inharmonious) arises. The exact presentation of the educational method or educational material which responded to knowledge and experience level of an educational achievement target or an educator-ed can be referred to as being connected with the improvement in work reliability, and before hand prevention of a human error as a result by then, incorporating

  20. Failure: A Source of Progress in Maintenance and Design

    Science.gov (United States)

    Chaïb, R.; Taleb, M.; Benidir, M.; Verzea, I.; Bellaouar, A.

    This approach, allows using the failure as a source of progress in maintenance and design to detect the most critical components in equipment, to determine the priority order maintenance actions to lead and direct the exploitation procedure towards the most penalizing links in this equipment, even define the necessary changes and recommendations for future improvement. Thus, appreciate the pathological behaviour of the material and increase its availability, even increase its lifespan and improve its future design. In this context and in the light of these points, the failures are important in managing the maintenance function. Indeed, it has become important to understand the phenomena of failure and degradation of equipments in order to establish an appropriate maintenance policy for the rational use of mechanical components and move to the practice of proactive maintenance [1], do maintenance at the design [2].

  1. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  2. Heuristics for the Economic Production Quantity Problem under Restrictions on Production and Maintenance Time

    Directory of Open Access Journals (Sweden)

    Qi Xu

    2016-01-01

    Full Text Available This paper proposes an economic production quantity problem with the maximal production run time and minimal preventive maintenance time over a finite planning horizon. The objective is to find the efficient production and maintenance policy to minimize the total cost composed of production, maintenance, shortages, and holding costs under the restriction on the production run time and the preventive maintenance time. The production and maintenance decisions include the production and maintenance frequencies and the production run and the maintenance time. The variability and the boundedness of the production run and maintenance time make the problem difficult to solve. Two heuristic algorithms are developed using different techniques based on the optimal properties of the relaxed problem. The performance comparison between the two algorithms is illustrated by numerical examples. The numerical results show that, for the most part, there exists a heuristic algorithm which is more effective than the other.

  3. STRATEGIES FOR THE MANAGEMENT OF BUILT HERITAGE LINKED TO MAINTENANCE AND MONITORING. CASE STUDY OF THE SAN ROQUE NEIGHBORHOOD, CUENCA, ECUADOR

    Directory of Open Access Journals (Sweden)

    M. C. Achig-Balarezo

    2017-10-01

    Full Text Available The rehabilitation of heritage sites, as well as the implementation of monitoring and control strategies is fundamental for its conservation. In the case of Cuenca, a World Heritage City, a maintenance campaign in the traditional neighborhood of San Roque was carried out in 2014. The objective was to undertake maintenance actions on roofs and façades as well as on elements at risk. The campaign process was developed keeping in mind the cycle or phases of preventive conservation: anamnesis, diagnosis, therapy and control (ICOMOS, 2003. At the end of the maintenance campaign an impact assessment was undertaken and monitoring tools were handed out to the community in order to strengthen the citizen participation in the preservation of built heritage. The experience of the maintenance campaign unveiled a series of lessons that have been evaluated in the present investigation, being the main objective the strengthening of the processes of governance and documentation through the formulation of strategies inherent to the maintenance of heritage buildings. In this process it is shown that the participation of citizens is a strategic factor for the sustainable development of maintenance campaigns, which allow for the preservation of historical sites for future generations.

  4. 77 FR 30030 - Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

    Science.gov (United States)

    2012-05-21

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory guide; issuance. SUMMARY... (RG) 1.160, ``Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.'' This guide... Monitoring the Effectiveness of Maintenance at Nuclear Power Plants,'' which provides methods that are...

  5. The Modern Approach to Industrial Maintenance Management

    Directory of Open Access Journals (Sweden)

    Vasile DEAC

    2010-01-01

    Full Text Available The maintenance activity isn’t a purpose in itself, it’s a necessity of which "the production suffers" and the financial agent “considers too expensive”. It often exists a conflict between the production units and the maintenance department, not only for a short term, but, sometimes, for a long term, imposing a rigorous definition of each person’s responsibilities. Considering the mutations in the industrial equipments’ technical complexity and the accidental failures’ catastrophic consequences from the economic and/or social point of view, it should be assigned a new dimension to the maintenance activity. One of the imperatives imposed to this action is represented by modern means of informing through the maintenance’s operational computerization.

  6. Performance measures for world class maintenance

    International Nuclear Information System (INIS)

    Labib, A.W.

    1998-01-01

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a 'real time' environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs

  7. Performance measures for world class maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Labib, A W [Department of Mechanical Engineering, University of Manchester, Institute of Science and Technology, Manchester (United Kingdom)

    1999-12-31

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a `real time` environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs.

  8. Performance measures for world class maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Labib, A.W. [Department of Mechanical Engineering, University of Manchester, Institute of Science and Technology, Manchester (United Kingdom)

    1998-12-31

    A main problem in maintenance in general, and in power plants and related equipment in particular, is the lack of a practical, consistent, and adaptive performance measure that provides a focused feedback and integrates preventive and corrective modes of maintenance. The presentation defines concepts of world class and benchmarking. Desirable features in an appropriate performance measure are identified. It then, demonstrates current practices in maintenance and criticises their shortcomings. An alternative model is presented through a case study. The model monitors performance from a general view, and then offers a focused analysis. The main conclusion is that the proposed model offers an adaptive and a dynamic framework, and hence production and maintenance are integrated in a `real time` environment. The system is also flexible in working with any other criteria whether they are of a quantitative or a qualitative nature. (orig.) 16 refs.

  9. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  10. The American Board of Internal Medicine Maintenance of Certification Examination and State Medical Board Disciplinary Actions: a Population Cohort Study.

    Science.gov (United States)

    McDonald, Furman S; Duhigg, Lauren M; Arnold, Gerald K; Hafer, Ruth M; Lipner, Rebecca S

    2018-03-07

    Some have questioned whether successful performance in the American Board of Internal Medicine (ABIM) Maintenance of Certification (MOC) program is meaningful. The association of the ABIM Internal Medicine (IM) MOC examination with state medical board disciplinary actions is unknown. To assess risk of disciplinary actions among general internists who did and did not pass the MOC examination within 10 years of initial certification. Historical population cohort study. The population of internists certified in internal medicine, but not a subspecialty, from 1990 through 2003 (n = 47,971). ABIM IM MOC examination. General internal medicine in the USA. The primary outcome measure was time to disciplinary action assessed in association with whether the physician passed the ABIM IM MOC examination within 10 years of initial certification, adjusted for training, certification, demographic, and regulatory variables including state medical board Continuing Medical Education (CME) requirements. The risk for discipline among physicians who did not pass the IM MOC examination within the 10 year requirement window was more than double than that of those who did pass the examination (adjusted HR 2.09; 95% CI, 1.83 to 2.39). Disciplinary actions did not vary by state CME requirements (adjusted HR 1.02; 95% CI, 0.94 to 1.16), but declined with increasing MOC examination scores (Kendall's tau-b coefficient = - 0.98 for trend, p actions were less severe among those passing the IM MOC examination within the 10-year requirement window than among those who did not pass the examination. Passing a periodic assessment of medical knowledge is associated with decreased state medical board disciplinary actions, an important quality outcome of relevance to patients and the profession.

  11. Maintenance program, organization and procedures

    International Nuclear Information System (INIS)

    Schegk, J.R.R.

    1986-01-01

    The Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) operates two pressurized water reactors (PWR) with 1.200 MW and 1.300 MW and two boiling water reactors (BWR) with an electrical output of 1.300 MW each. The PWR were commissioned in 1975 and 1977 respectively and have so far achieved a cumulative availability of 72%. The BWR started operating in 1984 and 1985. Since than they have been generating with a cumulative availability of 88%. The reliability of the nuclear power stations resulted in a trouble-free operation. For the last two years, the unscheduled non-availability amounted to 3,7% and 6,5% for the PWR and the BWR respectively. These favourable operating results derive inter alia from systematic preventive maintenance and consistent outage management. Apart from the personnel structure in the power stations the functional sequence of planning, control, performance as well as evaluation of maintenance results constitute a closed cycle. In order to ensure and support an effective cooperation of the above mentioned four functional sequences of a cycle, uniform and computer-assisted information and planning aids have been introduced such as task lists, job ordering, time scheduling and materials management. As a result of this preventive maintenance system the average refueling outage period is 35 to 42 days. (orig.)

  12. Planning of maintenance of electrical equipment in nuclear plants/laboratories [Paper No.: VB-3

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Bhattacharyya, A.K.

    1981-01-01

    Satisfactory operating performance of electrical systems ensures continuous availability of power to the various plants and machinery in nuclear plant and laboratories. For effective optimal functioning of the electrical equipment and to reduce their down time, scheduled planning of maintenance to the equipment is essential. Maintenance of power plant, nuclear or fossil, and industrial plant and research laboratories demands essential ingredients such as right type of trained and motivated technical personnel, adoption of standard procedures for maintenance, adequate safety and protection for equipment, safety procedures adopted in the installation to prevent hazards to the workers, provision of adequate stores and inventories, facilities for quick repairs and testing of equipment and effective planning of procedures for their maintenance. While breakdown maintenance allows equipment to operate before it is repaired or replaced, preventive maintenance makes use of scheduled inspection and periodical equipment overhaul and has little value for predicting future continuous performances of equipment. The engineered maintenance is most advantageous and offers maximum operating time to reduce down time of the equipment while adding predictive testing technique to aid in determining the frequency of overhaul of equipment. The important checks to be conducted and preventive maintenance programme to be scheduled are discussed in this paper. The safety and reliable functioning of the electrical equipment depend on proper optimal design, selection of equipment, their installation, subsequent maintenance and strict compliance with safety regulations. (author)

  13. Double-Shell Tank (DST) Maintenance and Recovery Subsystem Definition Report

    International Nuclear Information System (INIS)

    SMITH, E.A.

    2000-01-01

    The description of the Double-Shell Tank (DST) Maintenance and Recovery Subsystem presented in this document was developed to establish its boundaries. The DST Maintenance and Recovery Subsystem consists of new and existing equipment and facilities used to provide tank farm operators logistic support and problem resolution for the DST System during operations. This support will include evaluating equipment status, performing preventive and corrective maintenance, developing work packages, managing spares and consumables, supplying tooling, and training maintenance and operations personnel

  14. Analysis of the ITER ECH Upper Port Launcher remote maintenance using virtual reality

    International Nuclear Information System (INIS)

    Elzendoorn, Ben; de Baar, Marco; Chavan, Rene; Goodman, Timothy; Heemskerk, Cock; Heidinger, Roland; Kleefeldt, Klaus; Koning, Jarich; Sanders, Stephen; Spaeh, Peter; Strauss, Dirk; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    All ITER sub-systems of remote handling (RH) classes 1 and 2 have to be remotely maintainable. The maintenance strategy for these components has to ensure system availability after failure or scheduled maintenance. This paper shows how virtual reality (VR) simulation can be used as a tool to analyze the maintenance process, to predict the mean time to repair and to ensure the RH compatibility of one ITER sub-system, the Upper Port Launcher (UPL) . Special emphasis is put on the development of RH procedures and the identification of tooling requirements. The possibility to simulate RH logistics and repair actions in an early stage of the design process allows for the identification of those maintenance actions that require dedicated tests in the Launcher Handling Test Facility at Karlsruhe. The VR analysis, together with dedicated mock-up tests will demonstrate the RH compatibility of the UPL plug, provide input to the design of the Port Plug maintenance area in the ITER Hot Cell, and support the development of RH maintenance tooling.

  15. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  16. National Infrastructure Maintenance Strategy and its implementation

    CSIR Research Space (South Africa)

    Wall, K

    2008-10-01

    Full Text Available The National Infrastructure Maintenance Strategy (NIMS) was approved by Cabinet in 2006. This Strategy sets overarching policy for sector-based initiatives and describes the framework for a coordinated programme of actions. It is an essential part...

  17. 76 FR 65753 - Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

    Science.gov (United States)

    2011-10-24

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; extension of... the Effectiveness of Maintenance at Nuclear Power Plants,'' which provides methods that are acceptable... the Effectiveness of Maintenance at Nuclear Power Plants,'' of Title 10 of the Code of Federal...

  18. 9 CFR 416.15 - Corrective Actions.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Corrective Actions. 416.15 Section 416... SANITATION § 416.15 Corrective Actions. (a) Each official establishment shall take appropriate corrective... the procedures specified therein, or the implementation or maintenance of the Sanitation SOP's, may...

  19. Anticipation of maintenance of EDF nuclear power plants: the studying of the feasibility of big components repair or replacement

    International Nuclear Information System (INIS)

    Dubreuil Chambardel, A.

    2001-01-01

    Maintaining the technical-economic performance of nuclear power stations is in the first place provided by standard preventive maintenance. These are operations of test, monitoring or maintenance performed periodically on the components, providing the guarantee of a level of safety and availability of the NPPs at the lowest possible cost. To this standard maintenance is added exceptional maintenance which covers important operations of maintenance to be performed (generally only once) on a large number of units, the achievement of which may have a strong impact in terms of resources and availability. As an example can be quoted replacement of steam generators. The second level of anticipation of maintenance consists of having a prospective vision of major degradations which could affect components, of identifying exceptional operations of maintenance which should ''probably'' be performed some day, and of making certain that measures are taken in order that, if needed, their implementation affects as little as possible the performance of the EDF nuclear power stations. EDF has developed these two levels of anticipation since the onset of running its NPPs. However it has turned out to be necessary to intensify the preceding actions in particular with regard to the possibilities to repair or replace components, by identifying as completely as possible the equipment which could create problems and by assessing the interest to implement solutions with a view of making the best use of allocated resources. (author)

  20. Anticipation of maintenance of EDF nuclear power plants: the studying of the feasibility of big components repair or replacement

    Energy Technology Data Exchange (ETDEWEB)

    Dubreuil Chambardel, A. [Electricite de France (EDF), Div. Production Nucleaire, 93 - Saint-Denis (France)

    2001-07-01

    Maintaining the technical-economic performance of nuclear power stations is in the first place provided by standard preventive maintenance. These are operations of test, monitoring or maintenance performed periodically on the components, providing the guarantee of a level of safety and availability of the NPPs at the lowest possible cost. To this standard maintenance is added exceptional maintenance which covers important operations of maintenance to be performed (generally only once) on a large number of units, the achievement of which may have a strong impact in terms of resources and availability. As an example can be quoted replacement of steam generators. The second level of anticipation of maintenance consists of having a prospective vision of major degradations which could affect components, of identifying exceptional operations of maintenance which should ''probably'' be performed some day, and of making certain that measures are taken in order that, if needed, their implementation affects as little as possible the performance of the EDF nuclear power stations. EDF has developed these two levels of anticipation since the onset of running its NPPs. However it has turned out to be necessary to intensify the preceding actions in particular with regard to the possibilities to repair or replace components, by identifying as completely as possible the equipment which could create problems and by assessing the interest to implement solutions with a view of making the best use of allocated resources. (author)

  1. Optimising agile development practices for the maintenance operation: nine heuristics

    DEFF Research Database (Denmark)

    Heeager, Lise Tordrup; Rose, Jeremy

    2014-01-01

    Agile methods are widely used and successful in many development situations and beginning to attract attention amongst the software maintenance community – both researchers and practitioners. However, it should not be assumed that implementing a well-known agile method for a maintenance department...... is therefore a trivial endeavour - the maintenance operation differs in some important respects from development work. Classical accounts of software maintenance emphasise more traditional software engineering processes, whereas recent research accounts of agile maintenance efforts uncritically focus...... on benefits. In an action research project at Aveva in Denmark we assisted with the optimisation of SCRUM, tailoring the standard process to the immediate needs of the developers. We draw on both theoretical and empirical learning to formulate nine heuristics for maintenance practitioners wishing to go agile....

  2. 21 CFR 1271.160 - Establishment and maintenance of a quality program.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Establishment and maintenance of a quality program... Establishment and maintenance of a quality program. (a) General. If you are an establishment that performs any... corrective actions relating to core CGTP requirements, including reaudits of deficiencies, are taken and...

  3. Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases

  4. Different Transportation and Maintenance Strategies for Offshore Wind Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    as different maintenance strategies are considered. The report contains a case study where the presented approach is applied to a wind turbine farm and a sensitivity study of the different parameters like the operational range of the boat/helicopter, the electricity price, real rate of interest, inspection......Inspections as well as transportation of personnel and repair parts are a significant contributor to the levelized cost of energy for offshore wind turbines. There are different operation and maintenance (O&M) strategies for offshore wind turbines. Maintenance can be performed preventively...... of energy using different maintenance and transportation strategies....

  5. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength and stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation

  6. Functional Requirements and the Theory of Action.

    Science.gov (United States)

    Hills, R. Jean

    1982-01-01

    Responding to Willower's earlier questioning of the concept of systems' functional requirements, the author outlines the Parsonian theory of action, discussing action systems' components (values, norms, organizations, and facilities) and their functional imperatives or requirements (pattern maintenance, integration, goal attainment, and…

  7. Annual report of the maintenance division for 1965

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-12-01

    The personnel of the Division is organized in groups, each responsible for a number of tasks related to maintenance of reactor mechanical structures, electric equipment, electronic equipment. According to the action plan for 1965 the division for RA reactor maintenance the main activities were: planned maintenance of the reactor components, planned repair of the main components, indispensable repairs during reactor operation, repair during planned shutdown periods and tasks related to improvement of operation components and systems. Quite a significant number of failures was related to electronic equipment resulting from failures of thermometers in the heavy water system due to vibrations of the pumps. A number of spare parts and tools were produced needed for maintenance of reactor components, as well as instruments for control and calibration of reactor measuring devices [sr

  8. Enhancing pressure ulcer prevention using wound dressings: what are the modes of action?

    Science.gov (United States)

    Call, Evan; Pedersen, Justin; Bill, Brian; Black, Joyce; Alves, Paulo; Brindle, C Tod; Dealey, Carol; Santamaria, Nick; Clark, Michael

    2015-08-01

    Recent clinical research has generated interest in the use of sacral wound dressings as preventive devices for patients at risk of ulceration. This study was conducted to identify the modes of action through which dressings can add to pressure ulcer prevention, for example, shear and friction force redistribution and pressure distribution. Bench testing was performed using nine commercially available dressings. The use of dressings can reduce the amplitude of shear stress and friction reaching the skin of patients at risk. They can also effectively redirect these forces to wider areas which minimises the mechanical loads upon skeletal prominences. Dressings can redistribute pressure based upon their effective Poisson ratio and larger deflection areas, providing greater load redistribution. © 2013 The Authors. International Wound Journal © 2013 Medicalhelplines.com Inc and John Wiley & Sons Ltd.

  9. A maintenance time prediction method considering ergonomics through virtual reality simulation.

    Science.gov (United States)

    Zhou, Dong; Zhou, Xin-Xin; Guo, Zi-Yue; Lv, Chuan

    2016-01-01

    Maintenance time is a critical quantitative index in maintainability prediction. An efficient maintenance time measurement methodology plays an important role in early stage of the maintainability design. While traditional way to measure the maintenance time ignores the differences between line production and maintenance action. This paper proposes a corrective MOD method considering several important ergonomics factors to predict the maintenance time. With the help of the DELMIA analysis tools, the influence coefficient of several factors are discussed to correct the MOD value and the designers can measure maintenance time by calculating the sum of the corrective MOD time of each maintenance therbligs. Finally a case study is introduced, by maintaining the virtual prototype of APU motor starter in DELMIA, designer obtains the actual maintenance time by the proposed method, and the result verifies the effectiveness and accuracy of the proposed method.

  10. Initiating stochastic maintenance optimization at Candu Power Plants

    International Nuclear Information System (INIS)

    Doyle, E.K.

    2003-01-01

    As previously reported at ICONE 6 in New Orleans (1996), the use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Further cost refinement of the station maintenance strategy is being evaluated via the applicability of statistical analysis of historical failure data. Since the statistical evaluation was initiated in 1999 significant progress has been made in demonstrating the viability of stochastic methods in Candu maintenance. Some of the relevant results were presented at ICONE 10 in Washington DC (2002). Success with the graphical displays and the relatively easy to implement stochastic computer programs was sufficient to move the program along to the next significant phase. This next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principle impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. (author)

  11. Guide for generic application of Reliability Centered Maintenance (RCM) recommendations

    International Nuclear Information System (INIS)

    Schwan, C.A.; Toomey, G.E.; Morgan, T.A.; Darling, S.S.

    1991-02-01

    Previously completed reliability centered maintenance (RCM) studies form the basis for developing or refining a preventive maintenance program. This report describes a generic methodology that will help utilities optimize nuclear plant maintenance programs using RCM techniques. This guide addresses the following areas: history of the generic methodology development process, and use of the generic methodology for conducting system-to-system and component-to-component evaluations. 2 refs., 2 figs., 5 tabs

  12. Analytical method for optimization of maintenance policy based on available system failure data

    International Nuclear Information System (INIS)

    Coria, V.H.; Maximov, S.; Rivas-Dávalos, F.; Melchor, C.L.; Guardado, J.L.

    2015-01-01

    An analytical optimization method for preventive maintenance (PM) policy with minimal repair at failure, periodic maintenance, and replacement is proposed for systems with historical failure time data influenced by a current PM policy. The method includes a new imperfect PM model based on Weibull distribution and incorporates the current maintenance interval T 0 and the optimal maintenance interval T to be found. The Weibull parameters are analytically estimated using maximum likelihood estimation. Based on this model, the optimal number of PM and the optimal maintenance interval for minimizing the expected cost over an infinite time horizon are also analytically determined. A number of examples are presented involving different failure time data and current maintenance intervals to analyze how the proposed analytical optimization method for periodic PM policy performances in response to changes in the distribution of the failure data and the current maintenance interval. - Highlights: • An analytical optimization method for preventive maintenance (PM) policy is proposed. • A new imperfect PM model is developed. • The Weibull parameters are analytically estimated using maximum likelihood. • The optimal maintenance interval and number of PM are also analytically determined. • The model is validated by several numerical examples

  13. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  14. On condition based maintenance policy

    Directory of Open Access Journals (Sweden)

    Jong-Ho Shin

    2015-04-01

    Full Text Available In the case of a high-valuable asset, the Operation and Maintenance (O&M phase requires heavy charges and more efforts than the installation (construction phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs, we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

  15. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  16. Program strategies for maintenance management, organization and planning

    International Nuclear Information System (INIS)

    Czegeny, J.I.

    2003-01-01

    In this paper we look respectively at three specific examples showing program strategies for maintenance management, organization and planning. Starting with preventive maintenance optimization, we will look at one Bruce B Predefined task on the Reactor Regulating System to illustrate reduced maintenance requirement, a maintenance management strategy. Next discussed is the organizational strategy at Darlington to have an engineering program meet the jurisdictional requirements for maintaining certification for TSSA registered pressure vessels. The last look-see will show the earned value of the planning for the first Pickering A unit to be returned to service. Finally all the above is tied together in a compare and contrast of what works and what could be improved upon. (author)

  17. Preventative maintenance plan for emergency pumping trailers

    International Nuclear Information System (INIS)

    Wiggins, D.D.

    1994-09-01

    The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ''Single Shell Tank Leak Emergency Pumping Guide.''

  18. Probabilistic methods for maintenance program optimization

    International Nuclear Information System (INIS)

    Liming, J.K.; Smith, M.J.; Gekler, W.C.

    1989-01-01

    In today's regulatory and economic environments, it is more important than ever that managers, engineers, and plant staff join together in developing and implementing effective management plans for safety and economic risk. This need applied to both power generating stations and other process facilities. One of the most critical parts of these management plans is the development and continuous enhancement of a maintenance program that optimizes plant or facility safety and profitability. The ultimate objective is to maximize the potential for station or facility success, usually measured in terms of projected financial profitability, while meeting or exceeding meaningful and reasonable safety goals, usually measured in terms of projected damage or consequence frequencies. This paper describes the use of the latest concepts in developing and evaluating maintenance programs to achieve maintenance program optimization (MPO). These concepts are based on significant field experience gained through the integration and application of fundamentals developed for industry and Electric Power Research Institute (EPRI)-sponsored projects on preventive maintenance (PM) program development and reliability-centered maintenance (RCM)

  19. Ending preventable child deaths from pneumonia and diarrhoea by 2025. Development of the integrated Global Action Plan for the Prevention and Control of Pneumonia and Diarrhoea.

    Science.gov (United States)

    Qazi, Shamim; Aboubaker, Samira; MacLean, Rachel; Fontaine, Olivier; Mantel, Carsten; Goodman, Tracey; Young, Mark; Henderson, Peggy; Cherian, Thomas

    2015-02-01

    Despite the existence of low-cost and effective interventions for childhood pneumonia and diarrhoea, these conditions remain two of the leading killers of young children. Based on feedback from health professionals in countries with high child mortality, in 2009, WHO and Unicef began conceptualising an integrated approach for pneumonia and diarrhoea control. As part of this initiative, WHO and Unicef, with support from other partners, conducted a series of five workshops to facilitate the inclusion of coordinated actions for pneumonia and diarrhoea into the national health plans of 36 countries with high child mortality. This paper presents the findings from workshop and post-workshop follow-up activities and discusses the contribution of these findings to the development of the integrated Global Action Plan for the Prevention and Control of Pneumonia and Diarrhoea, which outlines the necessary actions for elimination of preventable child deaths from pneumonia and diarrhoea by 2025. Though this goal is ambitious, it is attainable through concerted efforts. By applying the lessons learned thus far and continuing to build upon them, and by leveraging existing political will and momentum for child survival, national governments and their supporting partners can ensure that preventable child deaths from pneumonia and diarrhoea are eventually eliminated. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  20. Elements of a total MOV maintenance program

    International Nuclear Information System (INIS)

    Lavallee, W.L.

    1989-01-01

    Establishing a good preventive and predictive maintenance program for motor-operated valves (MOVs) is an especially challenging task for nuclear power plants. Because of the sheer number of MOVs involved, all with somewhat different characteristics and requirements, and the extremely critical functions that some of the MOVs perform, the maintenance program quickly becomes a major exercise in coordination. This paper outlines a three-phase approach to achieving a comprehensive MOV maintenance program. It is based on experience in assisting nuclear plants with their MOV programs and encountering many of the pitfalls that can hamper these programs. The three phases include up-front engineering preparation, field diagnostic testing, and maintenance follow-up and trending. Each of these phases is discussed, and a flowchart describing the individual elements of each phase is provided

  1. Actions to reduce radioactive emissions: prevention of containment failure by flooding Containment and Reactor Cavity

    International Nuclear Information System (INIS)

    Fornos Herrando, J.

    2013-01-01

    The reactor cavity of Asco and Vandellos II is dry type, thus a severe accident leading to vessel failure might potentially end up resulting in the loss of containment integrity, depending on the viability to cool the molten core. Therefore, significant radioactive emissions could be released to outside. In the framework of Fukushima Stress Tests, ANAV has analyzed the convenience of carrying out different actions to prevent failure of the containment integrity in order to reduce radioactive emissions. The aim of this paper is to present and describe the main phenomenological aspects associated with two of these actions: containment flooding and reactor cavity flooding.

  2. 2003 Long-Term Surveillance and Maintenance Program Report

    International Nuclear Information System (INIS)

    2004-01-01

    Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future

  3. 2003 Long-Term Surveillance and Maintenance Program Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-07-01

    Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future

  4. Ecological Interface Design of Augmented Reality Display for Nuclear Power Plant Maintenance

    International Nuclear Information System (INIS)

    Kim, In; Seong, Poong Hyun

    2008-01-01

    The importance of maintenance in nuclear power plants (NPPs) has been emphasized through many researches. The goals of maintenance in nuclear power plants are not only to reduce the number of shutdowns which directly affects to the profit, but also to prevent accidents or incidents hence improves nuclear safety. It is known that reduction of the rate of human error in maintenance tasks can be achieved if maintenance personnel are properly supported by maintenance support systems. Among many proposed maintenance support system, the use of augmented reality (AR) has been proposed

  5. PENERAPAN MODEL PREVENTIVE MAINTENANCE SMITH DAN DEKKER DI PD. INDUSTRI UNIT INKABA

    Directory of Open Access Journals (Sweden)

    Hari Adianto

    2005-01-01

    Full Text Available The globalization era along with fast development of technology%2C industries must try to increase the quantity and quality of products that they have produced. The development of industrial products which have been increase continually need support from fluency of production process. In this case the industrial companies want a high availability system. PD Industri Unit Inkaba is one of the companies that moves in sector rubber technique industry. The company wants the production process go smoothly so that the company can keeps the existence and increases the product’s quality with cost efficiency and can competes with foreign markets. The smoothness of production process needs support from machines or production’s tools that have good condition. To keep the machines in good condition so that they will in the optimal condition when used%2C then the machines need to be maintained. M.A.J. Smith dan R. Dekker develop a model that combine availability model and preventive maintenance and consider the expected uptime and downtime of the system. This model is a 1 out of n system model%2C which has one operating machine and support by (n – 1 unit machine reserves. A 1 out of n system is also applicable to replaceable components. Smith and Dekker’s model gives the expected uptime and downtime of the system approximation that can gives good approximation of long term average operating cost. The results from decision of component preventive replacement age and optimal number of component reserve are expected to be able to keep the reliability system and be able to avoid the decease of availability system because of maintenance activity. Abstract in Bahasa Indonesia : Dalam era persaingan industri yang semakin global disertai perkembangan teknologi yang pesat%2C industri-industri terus berusaha meningkatkan kuantitas dan kualitas produk yang dihasilkannya. Perkembangan hasil industri yang semakin meningkat secara terus-menerus memerlukan dukungan

  6. Non-periodic preventive maintenance with reliability thresholds for complex repairable systems

    International Nuclear Information System (INIS)

    Lin, Zu-Liang; Huang, Yeu-Shiang; Fang, Chih-Chiang

    2015-01-01

    In general, a non-periodic condition-based PM policy with different condition variables is often more effective than a periodic age-based policy for deteriorating complex repairable systems. In this study, system reliability is estimated and used as the condition variable, and three reliability-based PM models are then developed with consideration of different scenarios which can assist in evaluating the maintenance cost for each scenario. The proposed approach provides the optimal reliability thresholds and PM schedules in advance by which the system availability and quality can be ensured and the organizational resources can be well prepared and managed. The results of the sensitivity anlysis indicate that PM activities performed at a high reliability threshold can not only significantly improve the system availability but also efficiently extend the system lifetime, although such a PM strategy is more costly than that for a low reliabiltiy threshold. The optimal reliability threshold increases along with the number of PM activities to prevent future breakdowns caused by severe deterioration, and thus substantially reduces repair costs. - Highlights: • The PM problems for repairable deteriorating systems are formulated. • The structural properties of the proposed PM models are investigated. • The corresponding algorithms to find the optimal PM strategies are provided. • Imperfect PM activities are allowed to reduce the occurences of breakdowns. • Provide managers with insights about the critical factors in the planning stage

  7. Development of maintenance engineering system

    International Nuclear Information System (INIS)

    1995-03-01

    Department of JMTR project has developed the Maintenance Engineering System which evaluates the aging tendency of the facilities. The system is used for the repair plan and the replace period of parts, components, equipments or facilities. The system has the data-base which consists of the check data, the inspection data, the trouble data and the repair data at the JMTR since the virgin criticality. The system is utilized maintenance works and concludes the maintenance procedures for the failure components, equipments and facilities. This system has the following characteristics. (1) Anybody can operate the system as easily as word processor. (2) Data are put into by man-machine-interface. (3) The data sheets are with light color and the recognizable arrangements. (4) The system is cost-efficient using commercial personal computers and applications. The research card and the layouts of the input data sheet had been formatted. Data has been begun to be put into the system and to check its functions. The result demonstrates that the system is available for preventive maintenance at the JMTR. (author)

  8. Prevention and control of mental illnesses and mental health: National Action Plan for NCD Prevention, Control and Health Promotion in Pakistan.

    Science.gov (United States)

    Nishtar, Sania; Minhas, Fareed A; Ahmed, Ashfaq; Badar, Asma; Mohamud, Khalif Bile

    2004-12-01

    As part of the National Action Plan for Non-communicable Disease Prevention, Control and Health Promotion in Pakistan (NAP-NCD), mental illnesses have been grouped alongside non-communicable diseases (NCD) within a combined strategic framework in order to synchronize public health actions. The systematic approach for mental illnesses is centred on safeguarding the rights of the mentally ill, reducing stigma and discrimination, and de-institutionalisation and rehabilitation of the mentally ill in the community outlining roles of healthcare providers, the community, legislators and policy makers. The approach has implications for support functions in a number of areas including policy building, manpower and material development and research. Priority action areas for mental health as part of NAP-NCD include the integration of surveillance of mental illnesses in a comprehensive population-based NCD surveillance system; creating awareness about mental health as part of an integrated NCD behavioural change communication strategy; integration of mental health with primary healthcare; the development of sustainable public health infrastructure to support community mental health initiatives; building capacity of the health system in support of prevention and control activities; effective implementation of existing legislation and harmonizing working relationships with law enforcing agencies. NAP-NCD also stresses on the need to integrate mental health into health services as part of a sustainable and integrated medical education programme for all categories of healthcare providers and the availability of essential psychotropic drugs at all healthcare levels. It lays emphasis on protecting the interests of special groups such as prisoners, refugees and displaced persons, women, children and individuals with disabilities. Furthermore, it promotes need-based research for contemporary mental health issues.

  9. Demonstration of reliability centered maintenance

    International Nuclear Information System (INIS)

    Schwan, C.A.; Morgan, T.A.

    1991-04-01

    Reliability centered maintenance (RCM) is an approach to preventive maintenance planning and evaluation that has been used successfully by other industries, most notably the airlines and military. Now EPRI is demonstrating RCM in the commercial nuclear power industry. Just completed are large-scale, two-year demonstrations at Rochester Gas ampersand Electric (Ginna Nuclear Power Station) and Southern California Edison (San Onofre Nuclear Generating Station). Both demonstrations were begun in the spring of 1988. At each plant, RCM was performed on 12 to 21 major systems. Both demonstrations determined that RCM is an appropriate means to optimize a PM program and improve nuclear plant preventive maintenance on a large scale. Such favorable results had been suggested by three earlier EPRI pilot studies at Florida Power ampersand Light, Duke Power, and Southern California Edison. EPRI selected the Ginna and San Onofre sites because, together, they represent a broad range of utility and plant size, plant organization, plant age, and histories of availability and reliability. Significant steps in each demonstration included: selecting and prioritizing plant systems for RCM evaluation; performing the RCM evaluation steps on selected systems; evaluating the RCM recommendations by a multi-disciplinary task force; implementing the RCM recommendations; establishing a system to track and verify the RCM benefits; and establishing procedures to update the RCM bases and recommendations with time (a living program). 7 refs., 1 tab

  10. Analysis of Task Types and Error Types of the Human Actions Involved in the Human-related Unplanned Reactor Trip Events

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Park, Jin Kyun; Jung, Won Dea

    2008-02-01

    This report provides the task types and error types involved in the unplanned reactor trip events that have occurred during 1986 - 2006. The events that were caused by the secondary system of the nuclear power plants amount to 67 %, and the remaining 33 % was by the primary system. The contribution of the activities of the plant personnel was identified as the following order: corrective maintenance (25.7 %), planned maintenance (22.8 %), planned operation (19.8 %), periodic preventive maintenance (14.9 %), response to a transient (9.9 %), and design/manufacturing/installation (9.9%). According to the analysis of error modes, the error modes such as control failure (22.2 %), wrong object (18.5 %), omission (14.8 %), wrong action (11.1 %), and inadequate (8.3 %) take up about 75 % of all the unplanned trip events. The analysis of the cognitive functions involved showed that the planning function makes the highest contribution to the human actions leading to unplanned reactor trips, and it is followed by the observation function (23.4%), the execution function (17.8 %), and the interpretation function (10.3 %). The results of this report are to be used as important bases for development of the error reduction measures or development of the error mode prediction system for the test and maintenance tasks in nuclear power plants

  11. Analysis of Task Types and Error Types of the Human Actions Involved in the Human-related Unplanned Reactor Trip Events

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Whan; Park, Jin Kyun; Jung, Won Dea

    2008-02-15

    This report provides the task types and error types involved in the unplanned reactor trip events that have occurred during 1986 - 2006. The events that were caused by the secondary system of the nuclear power plants amount to 67 %, and the remaining 33 % was by the primary system. The contribution of the activities of the plant personnel was identified as the following order: corrective maintenance (25.7 %), planned maintenance (22.8 %), planned operation (19.8 %), periodic preventive maintenance (14.9 %), response to a transient (9.9 %), and design/manufacturing/installation (9.9%). According to the analysis of error modes, the error modes such as control failure (22.2 %), wrong object (18.5 %), omission (14.8 %), wrong action (11.1 %), and inadequate (8.3 %) take up about 75 % of all the unplanned trip events. The analysis of the cognitive functions involved showed that the planning function makes the highest contribution to the human actions leading to unplanned reactor trips, and it is followed by the observation function (23.4%), the execution function (17.8 %), and the interpretation function (10.3 %). The results of this report are to be used as important bases for development of the error reduction measures or development of the error mode prediction system for the test and maintenance tasks in nuclear power plants.

  12. Spare parts sharing with joint optimization of maintenance and inventory policies

    DEFF Research Database (Denmark)

    Larsen, Christian; Wong, Hartanto Wijaya; Nielsen, Lars Relund

    We consider a collaborative arrangement where a number of companies are willing to share expensive spare parts, required for both failure replacement and preventive maintenance purposes. We develop a discrete-time Markov decision model for the joint optimization of maintenance and spare parts...

  13. Effectiveness of Relapse Prevention Cognitive-Behavioral Model in Opioid-Dependent Patients Participating in the Methadone Maintenance Treatment in Iran.

    Science.gov (United States)

    Pashaei, Tahereh; Shojaeizadeh, Davoud; Rahimi Foroushani, Abbas; Ghazitabatabae, Mahmoud; Moeeni, Maryam; Rajati, Fatemeh; M Razzaghi, Emran

    2013-08-01

    To evaluate the effectiveness of a relapse prevention cognitive-behavioral model, based on Marlatt treatment approach, in Opioid-dependent patients participating in the Methadone Maintenance Treatment (MMT) in Iran. The study consisted of 92 individuals treated with methadone in Iranian National Center of Addiction Studies (INCAS). Participants were randomized into two groups: educational intervention group (N=46) and control group (N=46). The intervention was comprised of 10 weekly 90 minute sessions, done during a period of 2.5 months based on the most high risk situations determined using Inventory Drug Taking Situation instrument. Relapse was defined as not showing up for MMT, drug use for at least 5 continuous days, and a positive urinary morphine test. While, only 36.4% of the intervention group relapsed into drug use, 63.6% of the control group relapsed. The result of the logistic regressions showed that the odd ratio of the variable of intervention program for the entire follow up period was 0.43 (P<0.01). Further, the odd ratio of this variable in one month, three months, and 195 days after the therapy were 0.48 (P<.03), 0.31 (P<.02), and 0.13 (P<.02) respectively that revealed that on average, the probability of relapse among individuals in the intervention group was lower than patients in control group. Relapse prevention model based on Marlatt treatment approach has an effective role in decreasing relapse rate. This model can be introduced as a complementary therapy in patients treated with methadone maintenance.

  14. ATLAS Maintenance and Operation management system

    CERN Document Server

    Copy, B

    2007-01-01

    The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

  15. The meteorological monitoring audit, preventative maintenance and quality assurance programs at a former nuclear weapons facility

    International Nuclear Information System (INIS)

    Maxwell, D.R.

    1995-01-01

    The purposes of the meteorological monitoring audit, preventative maintenance, and quality assurance programs at the Rocky Flats Environmental Technology Site (Site), are to (1) support Emergency Preparedness (EP) programs at the Site in assessing the transport, dispersion, and deposition of effluents actually or potentially released into the atmosphere by Site operations; and (2) provide information for onsite and offsite projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance activities, and remediation activities. The risk from the Site includes chemical and radioactive emissions historically related to nuclear weapons component production activities that are currently associated with storage of large quantities of radionuclides (plutonium) and radioactive waste forms. The meteorological monitoring program provides information for site-specific weather forecasting, which supports Site operations, employee safety, and Emergency Preparedness operations

  16. Anticipated affective consequences of physical activity adoption and maintenance.

    Science.gov (United States)

    Dunton, Genevieve Fridlund; Vaughan, Elaine

    2008-11-01

    The expected emotional consequences of future actions are thought to play an important role in health behavior change. This research examined whether anticipated affective consequences of success and failure vary across stages of physical activity change and differentially predict physical activity adoption as compared to maintenance. Using a prospective design over a 3-month period, a community sample of 329 healthy, middle-aged adults were assessed at 2 time points. Anticipated positive and negative emotions, stage of behavior change (precontemplation [PC], contemplation [C], preparation [P], action [A], maintenance [M]), and level of physical activity. At baseline, anticipated positive emotions were greater in C versus PC, whereas anticipated negative emotions were greater in M versus A and in M versus P. Higher anticipated positive but not negative emotions predicted physical activity adoption and maintenance after 3 months. Although the expected affective consequences of future success and failure differentiated among individuals in the early and later stages of physical activity change, respectively; only the anticipated affective consequences of success predicted future behavior.

  17. Costs of performance based maintenance for local roads: Case study Albania

    Science.gov (United States)

    Jokanović, Igor; Grujić, Bojana; Zeljić, Dragana; Grujić, Žarko; Svilar, Mila

    2017-12-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inadequate local roads maintenance in Albania is proposed to be solved by implementing performance based maintenance approach for which the costing exercise is presented within the paper.

  18. Analiza efekata uvođenja savremenih strategija održavanja / Effects of introducing modern maintenance strategies and their analysis

    Directory of Open Access Journals (Sweden)

    Petar Stanojević

    2003-07-01

    of failures, preventive maintenance time and frequency of preventive actions gives an average rise of about 5% to the overall profit of a business. Improvements in the field of knowledge and quality of work bring further 5% rise in profit.

  19. Failure mode and effect analysis in asset maintenance : a multiple case study in the process industry

    NARCIS (Netherlands)

    Braaksma, Jan; Klingenberg, W.; Veldman, J.

    2013-01-01

    Failure mode and effect analysis (FMEA) is an important method for designing and prioritising preventive maintenance activities and is often used as the basis for preventive maintenance planning. Although FMEA was studied extensively, most of the published work so far covers FMEA concept design.

  20. Failure mode and effect analysis in asset maintenance: a multiple case study in the process industry

    NARCIS (Netherlands)

    Braaksma, Anne Johannes Jan; Klingenberg, W.; Veldman, Jasper

    2013-01-01

    Failure mode and effect analysis (FMEA) is an important method for designing and prioritising preventive maintenance activities and is often used as the basis for preventive maintenance planning. Although FMEA was studied extensively, most of the published work so far covers FMEA concept design.

  1. Concepts for measuring maintenance performance and methods for analysing competing failure modes

    DEFF Research Database (Denmark)

    Cooke, R.; Paulsen, J.L.

    1997-01-01

    competing failure modes. This article examines ways to assess maintenance performance without introducing statistical assumptions, then introduces a plausible statistical model for describing the interaction of preventive and corrective maintenance, and finally illustrates these with examples from...

  2. Model for cost economic analysis in the maintenance of distribution networks

    International Nuclear Information System (INIS)

    Flores, N.; Leite, O.C.; Abe, R.Y.; Violante, R.A.

    1989-01-01

    A methodology for evaluating the costs from aerial distribution networks maintenance is described, aiming give a tool for the planning decisions, with the purpose to keeping the system operating in equilibrium conditions between the resources invested on the preventive and corrective maintenance. (C.G.C.)

  3. Nuclear instrument maintenance - problems, solutions, and obstacles

    International Nuclear Information System (INIS)

    Vuister, P.H.

    1983-01-01

    In 200 laboratories of South-East Asia, Latin America and Africa a survey was made of the state of instrumentation for nuclear medicine. The principal cause of failures and defects was inadequate quality control and preventive maintenance. On the basis of the survey coordinated research programs were compiled for the maintenance of nuclear instruments. The four principal points of the programs are: to safeguard quality and stable electric power supplies for the instruments, to safeguard permanent temperature and humidity in the environment in which the equipment is operated, effective maintenance, and training of personnel. In the years 1981 and 1982, 14 local training courses were run in which emphasis was put on practicals and tests in mechanics and electronics

  4. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  5. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  6. Towards total productive maintenance in the Eastern European mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Buck, J.D. [Kepner-Tregoe (United Kingdom) Ltd., Windsor

    1999-08-01

    An European Union consultancy project was undertaken to install a `best-in-class` maintenance system for the lignite mines of Romania. The project, funded by PHARE, started with a critical analysis of the maintenance and repair systems of equipment in both the open-pit and underground mines operated by RALO (Regia Autonoma a Lignitului Octenia). This study paved the way for the introduction of a computerised maintenance system and the inception of a planned preventative maintenance scheme. A development strategy leading by a structural methodology towards predictive maintenance and total productive maintenance was drawn up and attention was given to multi-skilling, training and further facilitating activities to enable the success of the total productive maintenance strategy. An abridged version of the paper was presented at MAINTE 97, held in Birmingham, UK in 1997. 5 refs., 5 figs., 1 tab.

  7. Initial training and technology transfer during the generational transition in the personnel of maintenance

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    2006-01-01

    A significant progress in training capabilities of nuclear power plants maintenance personnel has taken place since mid of nineties. In the past, maintenance personnel acquired their competence throughout the years on their job positions. A greater flexibility and new polyvalence requirements demand efficient training actions. In addition, the new personnel incomes associated to the generational change require clear qualification processes. The objective is to develop didactic means and to have competent instructors to preserve and to transfer the knowledge acquires during all these past years to the new incorporations. This article describes a summary of actions and methods followed for the design, development and implantation of training plans for maintenance personnel. (Author)

  8. Master--slave manipulators and remote maintenance at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Jenness, R.G.; Wicker, C.D.

    1975-01-01

    The volume of master-slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and the organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and the development of precise procedures for accomplishing the maintenance of 283 installed units. To provide the most economical type of preventive maintenance, a very satisfactory computer-programmed maintenance system has been established at the Laboratory. (auth)

  9. The maintenance of nuclear medicine equipments: the stakes in the liberal sector

    International Nuclear Information System (INIS)

    Fauchet, M.; Chambon, T.; Tellier, P.

    1994-01-01

    Maintenance of nuclear medicine installations is an obligation in the private sector (preventive maintenance to be sure of the detectors quality and of the associated software and hardware, corrective maintenance to be sure of the results quality and of the installations profitability). They must be negotiated at the time of the installations choice and added to the total cost of the equipment. Gamma cameras are chosen for illustrating these maintenance problems. (A.B.). 5 refs., 7 figs

  10. Management of remanent lifetime. Short-term benefits of the maintenance evaluation and improvement programme; Gestion de la vida remanente de instalaciones industriales. Extension de vida

    Energy Technology Data Exchange (ETDEWEB)

    Sainero Garcia, J [Empresarios Agrupados, Madrid (Spain)

    1993-12-15

    Remanent Lifetime Management, which is scientifically based on knowing the degradatory phenomena associated with aging, today allows us to optimize plant life through a long-term maintenance strategy combining preventive maintenance and condition monitoring programmes. Within a project for Remanent Lifetime Management (RLM), the determination of methods of control and mitigation of degradations due to aging depends on the programme of Maintenance Evaluation and Improvement (MEI). This programme, underpinned by the analysis of degradatory phenomena to which plant components are subjected, evaluates current maintenance practices and defines the complementary actions which would facilitate establishment of a long-term strategy to control aging. Together with this main objective of the RLM project, the MEI programme achieves short-term benefits since, right from the beginning, it offers solutions to mitigate and guard against degradations in crucial plant components, and generally sets out a programme to control aging. The MEI programme further serves as a tool to reach the final objectives of the new 10CFR50.65 rule, 'Requirements for Maintenance Programs for NPPs'. The MEI always offers the option should the Utility Owner decide to extend plant life. (author)

  11. Improving Suicide Prevention in Dutch Regions by Creating Local Suicide Prevention Action Networks (SUPRANET): A Study Protocol.

    Science.gov (United States)

    Gilissen, Renske; De Beurs, Derek; Mokkenstorm, Jan; Mérelle, Saskia; Donker, Gé; Terpstra, Sanne; Derijck, Carla; Franx, Gerdien

    2017-03-28

    The European Alliance against Depression (EAAD) program is to be introduced in The Netherlands from 2017 onwards. This program to combat suicide consists of interventions on four levels: (1) increasing the awareness of suicide by local media campaigns; (2) training local gatekeepers, such as teachers or police officers; (3) targeting high-risk persons in the community; and (4) training and support of professionals in primary care settings. The implementation starts in seven Dutch pilot regions. Each region is designated as a Suicide Prevention Action NETwork (SUPRANET). This paper describes the SUPRANET program components and the evaluation of its feasibility and impact. The findings will be used to facilitate the national implementation of EAAD in The Netherlands and to add new findings to the existing literature on EAAD.

  12. A probabilistic computational framework for bridge network optimal maintenance scheduling

    International Nuclear Information System (INIS)

    Bocchini, Paolo; Frangopol, Dan M.

    2011-01-01

    This paper presents a probabilistic computational framework for the Pareto optimization of the preventive maintenance applications to bridges of a highway transportation network. The bridge characteristics are represented by their uncertain reliability index profiles. The in/out of service states of the bridges are simulated taking into account their correlation structure. Multi-objective Genetic Algorithms have been chosen as numerical tool for the solution of the optimization problem. The design variables of the optimization are the preventive maintenance schedules of all the bridges of the network. The two conflicting objectives are the minimization of the total present maintenance cost and the maximization of the network performance indicator. The final result is the Pareto front of optimal solutions among which the managers should chose, depending on engineering and economical factors. A numerical example illustrates the application of the proposed approach.

  13. A Novel Short-Term Maintenance Strategy for Power Transmission and Transformation Equipment Based on Risk-Cost-Analysis

    Directory of Open Access Journals (Sweden)

    Hang Yang

    2017-11-01

    Full Text Available Current studies on preventive condition-based maintenance of power transmission and transformation equipment mainly focus on mid-term or long-term maintenance, and cannot meet the requirements of short-term especially temporary maintenance. In order to solve the defects of the present preventive maintenance strategies, according to the engineering application and based on risk-cost analysis, a short-term maintenance strategy is proposed in this manuscript. For the equipment working in bad health condition, its active maintenance costs and operation risk costs are evaluated, respectively. Then the latest maintenance time is calculated in accordance with the principle that its operation risk costs are no higher than active maintenance costs. Utilizing the latest maintenance time, the best maintenance time is calculated by setting the maximum relative earnings of postponing maintenance as the target, which provides the operation staffs with comprehensive maintenance-decision support. In the end, different cases on the IEEE 24-bus system are simulated. The effectiveness and advantages of the proposed strategy are demonstrated by the simulation results.

  14. Maintenance Cycle Extension in the IRIS Advanced Light Water Reactor Plant Design

    International Nuclear Information System (INIS)

    Galvin, Mark R.; Todreas, Neil E.; Conway, Larry E.

    2003-01-01

    New nuclear power generation in the United States will be realized only if the economic performance can be made competitive with other methods of electrical power generation. The economic performance of a nuclear power plant can be significantly improved by increasing the time spent on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Maintenance includes planned actions (surveillances) and unplanned actions (corrective maintenance) to respond to component degradation or failure. A methodology is described that can be used to resolve, in the design phase, maintenance-related operating cycle length barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the International Reactor, Innovative and Secure (IRIS) design. IRIS is an advanced light water nuclear power plant that is being designed to maximize this on-line generating time by increasing the operating cycle length. This is consequently a maintenance strategy paper using the IRIS plant as the example.Potential IRIS operating cycle length maintenance-related barriers, determined by modification of an earlier operating pressurized water reactor (PWR) plant cycle length analysis to account for differences between the design of IRIS and this operating PWR, are presented. The proposed methodology to resolve these maintenance-related barriers by the design process is described. The results of applying the methodology to two potential IRIS cycle length barriers, relief valve testing and emergency heat removal system testing, are presented

  15. A summary of maintenance policies for a finite interval

    International Nuclear Information System (INIS)

    Nakagawa, T.; Mizutani, S.

    2009-01-01

    It would be an important problem to consider practically some maintenance policies for a finite time span, because the working times of most units are finite in actual fields. This paper converts the usual maintenance models to finite maintenance models. It is more difficult to study theoretically optimal policies for a finite time span than those for an infinite time span. Three usual models of periodic replacement with minimal repair, block replacement and simple replacement are transformed to finite replacement models. Further, optimal periodic and sequential policies for an imperfect preventive maintenance and an inspection model for a finite time span are considered. Optimal policies for each model are analytically derived and are numerically computed

  16. Analysis on the gamma dose distribution by major corrosion products during preventive maintenance period in nuclear power plant

    International Nuclear Information System (INIS)

    Ha, Wi Ho

    2006-02-01

    The information on dose distribution inside the containment building is an essential requirement to make a reduction of radiation exposure as well as effective operation and design of nuclear power plant. After reactor shutdown, radiation exposure to workers mainly occurs during preventive maintenance period due to inspection or repair works of major components. During that period, gamma doses are induced by major corrosion products in the primary coolant system. The radiation exposure to workers has been assessed by using the measurements. The measurements are, of course, a basic and reliable assessment. But the measurement has defect such as limitation of detecting area. In order to improve the defect of the measurements, system for assessment of gamma dose distribution during preventive maintenance period by using computational code was suggested in this study. First, activity of major corrosion products was calculated by using modified CRUDSIM code. Original CRUDSIM code was modified to add evaluation of other major corrosion products besides cobalt isotopes. Modeling of containment building for YGN Unit 3 was then performed. Gamma dose distribution by major corrosion products inside the containment building was calculated by using MCNPX code. Finally, the calculations were mapped for whole space inside the containment building and were compared with the measurements. As a result of this study, the defect of the measurement are supplemented by using computational calculation system, and it is expected that workers can make an effective work plan through providing dose distribution inside the containment building in advance. In addition, this study can be applied to technology development to make an effective containment shielding design of the next generation reactor as well as an improvement of the safety for workers in nuclear power plant

  17. Optimal maintenance policy incorporating system level and unit level for mechanical systems

    Science.gov (United States)

    Duan, Chaoqun; Deng, Chao; Wang, Bingran

    2018-04-01

    The study works on a multi-level maintenance policy combining system level and unit level under soft and hard failure modes. The system experiences system-level preventive maintenance (SLPM) when the conditional reliability of entire system exceeds SLPM threshold, and also undergoes a two-level maintenance for each single unit, which is initiated when a single unit exceeds its preventive maintenance (PM) threshold, and the other is performed simultaneously the moment when any unit is going for maintenance. The units experience both periodic inspections and aperiodic inspections provided by failures of hard-type units. To model the practical situations, two types of economic dependence have been taken into account, which are set-up cost dependence and maintenance expertise dependence due to the same technology and tool/equipment can be utilised. The optimisation problem is formulated and solved in a semi-Markov decision process framework. The objective is to find the optimal system-level threshold and unit-level thresholds by minimising the long-run expected average cost per unit time. A formula for the mean residual life is derived for the proposed multi-level maintenance policy. The method is illustrated by a real case study of feed subsystem from a boring machine, and a comparison with other policies demonstrates the effectiveness of our approach.

  18. Protocol of source shielding maintenance in a level measurement systems

    International Nuclear Information System (INIS)

    Gonzales, E.; Figueroa, J.

    1996-01-01

    Maintenance labor of the source shielding and locking system is not performed in many Venezuelan enterprises that employ radioactive level gauge in large container. The lack of maintenance and the ambient long lasting action have produced impairment of many devices and their given parts rise to economical and radiological protection problems. In order to help to solve the mentioned problems, principally to reduce the unjustified dose to workers, the IVIC Health Physics Service worked out a protocol to perform, in a safety way, the maintenance of source shielding and its locking system. This protocol is presented in this paper. (authors)

  19. [Potentiation of anti-ischemic and anti-anginal action of nitrates by hydrogen sulfide balneotherapy in patients with angina of effort].

    Science.gov (United States)

    Zunnunov, Z R

    2010-01-01

    The objective of this comparative study was to evaluate effects of nitrosorbid (NS) and hydrogen sulfide-based balneotherapy (HSB) applied alone or in combination for the treatment of patients presenting with angina of effort. It was shown that long-term HSB therapy enhances the anti-anginal and anti-ischemic action of NS in such patients. The authors argue that prolonged HSB-based maintenance therapy in combination with nitrates prevents habituation to these preparations and potentiates their beneficial therapeutic effect.

  20. Policy for equipment’s leasing period extension with minimum cost of maintenance

    Science.gov (United States)

    Lestari, C.; Kurniati, N.

    2018-04-01

    The cost structure for equipment investment including purchase cost and maintenance cost is getting more expensive. The company considers to lease the equipment instead of purchase it under a contractual agreement. Offering to extend the lease period, following to the base lease period, will provide more benefits for both the lessor (owner) and the lessee (user). Whenever the lease period extension offered at the beginning of the contract, there are some risks in finance e.g. uncertainty of the equipment performance and lessor responsibility. Therefore, this research attempts to model the optimal maintenance policy for lease period extension offered at the end of the contract. Minimal repair is performed to rectify a failed equipment, while imperfect preventive maintenance is conducted to improve the operational state of the equipment when reaches a certain control limit to avoid failures. The mathematical model is constructed to determine the optimal control limit, the number and degree of preventive maintenance, and the multiplication number of the lease period extension. Finally, numerical examples are given to illustrate the influences of the optimal length of the extended lease and the maintenance policy to minimize the maintenance cost.