  1. Preventive distribution and plans of iodine tablets stocks management

    International Nuclear Information System (INIS)

    2002-01-01

    This official note includes two parts: one concerns the new preventive distribution of iodine tablets on the areas defined by the Particular Intervention Plans (P.P.I.) around nuclear facilities and the other one the setting up of iodine tablets stocks beyond the P.P.I. areas. In annexe is a guide for the elaboration of stocks management plans for steady iodine tablets. (N.C.)

  2. Knowledge management: an application to wildfire prevention planning

    Science.gov (United States)

    Daniel L Schmoldt

    1989-01-01

    Residential encroachment into wildland areas places an additional burden on fire management activities. Prevention programs, fuel management efforts, and suppression strategies, previously employed in wildland areas, require modification for protection of increased values at risk in this interface area. Knowledge-based computer systems are being investigated as...

  3. Modality planning for preventing tunnel vision in crisis management

    NARCIS (Netherlands)

    Cao, Y.; Nijholt, Antinus; Theune, Mariët; van der Sluis, Ielka; Bachvarova, Yulia; Andre, Elisabeth

    2008-01-01

    Crisis management is a time-critical task with high uncertainty and high risk. Stress and cognitive overload often result in a set of bias in crisis manager’s situation understanding and information confirming processes, known as 'tunnel vision'. Aiming at preventing tunnel vision, we propose an

  4. Preventive distribution and plans of iodine tablets stocks management; Distribution preventive et plans de gestion des stocks de comprimes d'iode

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This official note includes two parts: one concerns the new preventive distribution of iodine tablets on the areas defined by the Particular Intervention Plans (P.P.I.) around nuclear facilities and the other one the setting up of iodine tablets stocks beyond the P.P.I. areas. In annexe is a guide for the elaboration of stocks management plans for steady iodine tablets. (N.C.)

  5. Incorporating economic valuation into fire prevention planning and management in Southern European countries

    Directory of Open Access Journals (Sweden)

    Elsa Varela

    2015-08-01

    Full Text Available Aim of study: This article describes and analyzes the links between the fire-based scientific knowledge, the social perception of fire prevention and forest fires and the economic valuation requirements to assess social preferences for fire prevention measures. Area of study: Southern European countries. Material and Methods: For that purpose, we develop a critical revision of the existing literature on economic valuation of social preferences for fire risk reduction and fire prevention in terms of its links with fire science and social perceptions and the applicability of these results in fire management policies. Research highlights: The assessment of social preferences for fire related issues is challenging due to the difficulty of setting sound valuation scenarios that can simultaneously be relevant for the respondents and derive conclusions useful for fire management. Most of the revised studies set up valuation scenarios focused on the final management outcome e.g. number of burnt hectares, what is easier for the respondents to evaluate but weakens the scientific relationship with fire management, making difficult reaching conclusions for sound management advice. A more recent set of valuation studies has been developed where risk perception of homeowners is further assessed as a key variable determining their preferences in valuation scenarios. These studies are relevant for mangers setting fire prevention programs in wildland urban interface areas as understanding the factors that may promote or hinder the enrolment of these homeowners in fire prevention activities may have direct implication in addressing communication programs to promote fire prevention management.

  6. Storm Water Management for Industrial Activities: Developing Pollution Prevention Plans and Best Management Practices

    Science.gov (United States)

    1992-09-01

    out over a wide area. So, small oil and grease spills at hundreds of different facilities within a single city can collectively represent a major...adsorption and absorption. Sorbents adsorb (an attraction to the outer surface of a material) or absorb (taken in by the material like a sponge ) only when... Stormwater Management, Special Report No. 49," American Public Works Association Research Foundation. 1981. Arapahoe County, "Erosion Control

  7. Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS's program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives

  8. Public health program planning logic model for community engaged type 2 diabetes management and prevention.

    Science.gov (United States)

    West, Joseph F

    2014-02-01

    Diabetes remains a growing epidemic with widening health inequity gaps in disease management, self-management knowledge, access to care and outcomes. Yet there is a paucity of evaluation tools for community engaged interventions aimed at closing the gaps and improving health. The Guide to Community Preventive Services (the Community Guide) developed by the Task Force on Community Preventive Services (the Task Force) at the Centers for Disease Control and Prevention (CDC) recommends two healthcare system level interventions, case management interventions and disease management programs, to improve glycemic control. However, as a public health resource guide for diabetes interventions a model for community engagement is a glaringly absent component of the Community Guide recommendations. In large part there are few evidence-based interventions featuring community engagement as a practice and system-level focus of chronic disease and Type 2 diabetes management. The central argument presented in this paper is that the absence of these types of interventions is due to the lack of tools for modeling and evaluating such interventions, especially among disparate and poor populations. A conceptual model emphasizing action-oriented micro-level community engagement is needed to complement the Community Guide and serve as the basis for testing and evaluation of these kinds of interventions. A unique logic model advancing the Community Guide diabetes recommendations toward measureable and sustainable community engagement for improved Type 2 diabetes outcomes is presented. Copyright © 2013 Elsevier Ltd. All rights reserved.

  9. Pollution prevention program plan 1996

    International Nuclear Information System (INIS)

    1996-01-01

    This plan serves as the principal crosscutting guidance to Department of Energy (DOE) Headquarters, Operations Office, laboratory, and contractor management to fully implement pollution prevention programs within the DOE complex between now and 2000. To firmly demonstrate DOE's commitment to pollution prevention, the Secretary of Energy has established goals, to be achieved by December 31, 1999, that will aggressively reduce DOE's routine generation of radioactive, mixed, and hazardous wastes, and total releases and offsite transfers of toxic chemicals. The Secretary also has established sanitary waste reduction, recycling, and affirmative procurement goals. Site progress in meeting these goals will be reported annually to the Secretary in the Annual Report on Waste Generation and Waste Minimization Progress, using 1993 as the baseline year. Implementation of this plan will represent a major step toward reducing the environmental risks and costs associated with DOE operations

  10. Economic perspective on strategic human capital management and planning for the Centers for Disease Control and Prevention.

    Science.gov (United States)

    Roy, Kakoli; Chen, Zhuo Adam; Crawford, Carol A Gotway

    2009-11-01

    An organization's workforce--or human capital--is its most valuable asset. The 2002 President's Management Agenda emphasizes the importance of strategic human capital management by requiring all federal agencies to improve performance by enhancing personnel and compensation systems. In response to these directives, the Centers for Disease Control and Prevention (CDC) drafted its strategic human capital management plan to ensure that it is aligned strategically to support the agency's mission and its health protection goals. In this article, we explore the personnel economics literature to draw lessons from research studies that can help CDC enhance its human capital management and planning. To do so, we focus on topics that are of practical importance and empirical relevance to CDC's internal workforce and personnel needs with an emphasis on identifying promising research issues or methodological approaches. The personnel economics literature is rich with theoretically sound and empirically rigorous approaches for shaping an evidence-based approach to human capital management that can enhance incentives to attract, retain, and motivate a talented federal public health workforce, thereby promoting the culture of high-performance government.

  11. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  12. Fact Sheet: Clean Air Act Section 112(r): Accidental Release Prevention / Risk Management Plan Rule

    Science.gov (United States)

    EPA is required to publish regulations and guidance for chemical accident prevention at facilities that pose the greatest risk of harm from accidental releases of regulated flammable and toxic substances above threshold quantities.

  13. Work hazard prevention plans

    International Nuclear Information System (INIS)

    Albertos Campos, F.

    2009-01-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  14. Waste minimization and pollution prevention awareness plan

    International Nuclear Information System (INIS)

    1991-01-01

    The purpose of this plan is to document the Lawrence Livermore National Laboratory (LLNL) Waste Minimization and Pollution Prevention Awareness Program. The plan specifies those activities and methods that are or will be employed to reduce the quantity and toxicity of wastes generated at the site. The intent of this plan is to respond to and comply with (DOE's) policy and guidelines concerning the need for pollution prevention. The Plan is composed of a LLNL Waste Minimization and Pollution Prevention Awareness Program Plan and, as attachments, Program- and Department-specific waste minimization plans. This format reflects the fact that waste minimization is considered a line management responsibility and is to be addressed by each of the Programs and Departments. 14 refs

  15. Waste minimization and pollution prevention awareness plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-05-31

    The purpose of this plan is to document the Lawrence Livermore National Laboratory (LLNL) Waste Minimization and Pollution Prevention Awareness Program. The plan specifies those activities and methods that are or will be employed to reduce the quantity and toxicity of wastes generated at the site. The intent of this plan is to respond to and comply with (DOE's) policy and guidelines concerning the need for pollution prevention. The Plan is composed of a LLNL Waste Minimization and Pollution Prevention Awareness Program Plan and, as attachments, Program- and Department-specific waste minimization plans. This format reflects the fact that waste minimization is considered a line management responsibility and is to be addressed by each of the Programs and Departments. 14 refs.

  16. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  17. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  18. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  19. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  20. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  1. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  2. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  3. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  4. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  5. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  6. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  7. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  8. Idaho National Laboratory Site Pollution Prevention Plan

    Energy Technology Data Exchange (ETDEWEB)

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively

  9. Idaho National Laboratory Site Pollution Prevention Plan

    International Nuclear Information System (INIS)

    E. D. Sellers

    2007-01-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively

  10. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  11. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  12. Improving Prevention, Early Recognition and Management of Acute Kidney Injury after Major Surgery: Results of a Planning Meeting with Multidisciplinary Stakeholders

    Directory of Open Access Journals (Sweden)

    Matthew T James

    2014-08-01

    Full Text Available Purpose of review: Acute kidney injury (AKI is common after major surgery, and is associated with morbidity, mortality, increased length of hospital stay, and high health care costs. Although recent guidelines for AKI provide recommendations for identification of patients at risk, monitoring, diagnosis, and management of AKI, there is lack of understanding to guide successful implementation of these recommendations into clinical practice. Sources of information: We held a planning meeting with multidisciplinary stakeholders to identify barriers, facilitators, and strategies to implement recommendations for prevention, early identification, and management of AKI after major surgery. Barriers and facilitators to knowledge use for peri-operative AKI prevention and care were discussed. Findings: Stakeholders identified barriers in knowledge (how to identify high-risk patients, what criteria to use for diagnosis of AKI, attitudes (self-efficacy in preventive care and management of AKI, and behaviors (common use of diuretics, non-steroidal anti-inflammatory drugs, withholding of intravenous fluids, and competing time demands in peri-operative care. Educational, informatics, and organizational interventions were identified by stakeholders as potentially useful elements for future interventions for peri-operative AKI. Limitation: Meeting participants were from a single centre. Implications: The information and recommendations obtained from this stakeholder's meeting will be useful to design interventions to improve prevention and early care for AKI after major surgery.

  13. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  14. Management self assessment plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1998-01-01

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations

  15. Preventing readmissions through comprehensive discharge planning.

    Science.gov (United States)

    Hunter, Tabitha; Nelson, James Rex; Birmingham, Jackie

    2013-01-01

    Case managers, including nurses and social workers, provide essential services to hospitalized patients, including mandated discharge planning that has been shown to impact patient safety and patient outcomes. The heightened attention to readmission is evident in both reimbursement and accreditation initiatives. The Centers for Medicare & Medicaid Services, Office of Clinical Standards & Quality/Survey & Certification Group, is revising worksheets to be used by surveyors to review how hospitals are complying with the Medicare Conditions of Participation with a focus on discharge planning as it relates to patient safety. This is an opportunity for case managers to apply the principles of case management to the targeted problem of readmissions. Now case managers must identify the reasons for readmission on a patient-by-patient basis, collect data, analyze processes, and then change practice in the hospital and work more closely with community-based providers. The purpose of this article is to recommend improvement in a consistent case management practice that will positively influence patient readmissions. Hospital-based case managers who are responsible for discharge planning functions. Hospital administrators will also find this information valuable as a tool to assess strategies to control preventable readmissions and to comply with the Medicare Conditions of Participation for discharge planning. Hospital-based case managers, responsible for discharge planning, have a unique opportunity to interact face-to-face with patients who are readmitted to determine factors that lead to the readmission. Case managers need to change their practice to include assessing patients on the basis of their prior level of care. Pharmacists need to play a bigger role in discharge planning, especially for patients who have experienced a potentially avoidable readmission. Working closely with community-based providers is essential to target reasons for readmission. The Medicare

  16. City planning as preventive medicine.

    Science.gov (United States)

    Corburn, Jason

    2015-08-01

    The health and well-being of rapidly growing urban populations is a global health issue. Cities in the global north and south are faced with rising health inequities - or avoidable differences in health determinants and outcomes based on place, social status and ethnicity. This commentary suggests that focusing only on treatment interventions in cities is likely to fail because populations will be forced to go back into the urban living and working conditions that likely made them sick in the first place. City planning as preventive medicine includes taking a relational and systems approach to urban health, requiring health assessments for all urban policy making, promoting neighborhood health centers as engines of community economic development and gathering place-based health indicator data to track progress and adapt interventions over time as conditions change. Copyright © 2015 Elsevier Inc. All rights reserved.

  17. Comprehensive Environmental Management Plan

    International Nuclear Information System (INIS)

    Hjeresen, D.L.

    1994-01-01

    The Environmental Management Program at Los Alamos National Laboratory is in the process of initiating and then implementing a Comprehensive Environmental Management Plan (CEMP). There are several environmental impact and compliance drivers for this initiative. The Los Alamos CEMP is intended to be a flexible, long-range process that predicts, minimizes, treats, and disposes of any waste generated in execution of the Los Alamos mission - even if that mission changes. The CEMP is also intended to improve stakeholder and private sector involvement and access to environmental information. The total quality environmental management (TQEM) process will benchmark Los Alamos to private sector and DOE operations, identify opportunities for improvement, prioritize among opportunities, implement projects, measure progress, and spur continuous improvement in Environmental Management operations

  18. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  19. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  20. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  1. Cholera - management and prevention.

    Science.gov (United States)

    Davies, Hannah G; Bowman, Conor; Luby, Stephen P

    2017-06-01

    Cholera is an acute secretory diarrhoeal infection caused by the bacterium Vibrio cholerae. It is likely to have originated in the Indian sub-continent; however, it spread to cause six worldwide pandemics between 1817-1923. The ongoing seventh worldwide pandemic of cholera began in 1961. The intensity, duration and severity of cholera epidemics have been increasing, signaling the need for more effective control and prevention measures. The response to the cholera pandemics of the 19th century led to the development of safe and effective sanitation and water systems which have effectively removed the risk of cholera in many settings. However, such systems are not in place to protect billions of people worldwide. Although some progress has been made in expanding access to water in recent years, achieving optimal infrastructure will, in the most optimistic scenario, take decades. Climate change, extreme weather events and rapid urbanisation suggests that alternatives to the current paradigm of providing large centralised water and sanitation systems should be considered, including smaller decentralised systems. The aim of this review paper is to provide an overview of current knowledge regarding management of cholera with a focus on prevention measures including vaccination and water and sanitation interventions. © 2017 The British Infection Association. Published by Elsevier Ltd. All rights reserved.

  2. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  3. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  4. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  5. B Plant Complex pollution prevention plan. Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    The US Department of Energy (DOE) has directed Westinghouse Hanford Company (WHC) to develop an effective strategy to minimize the generation of hazardous, radioactive, and mixed wastes at Hanford in compliance with state and federal regulations. WHC has formalized a pollution prevention program composed of management policies, management requirements and procedures. This plan addresses pollution prevention for B Plant Complex. A pollution prevention team is in place and has been assigned responsibility for implementing the plan. This plan includes actions and goals for reducing volume and toxicity of waste generated, as well as a basis for evaluation of progress. Descriptions of waste streams, current specific goals, general pollution prevention methods, and specific accomplishments are in the appendices of this plan

  6. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  7. Waste Minimization and Pollution Prevention Awareness Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The purpose of this plan is to document Lawrence Livermore National Laboratory (LLNL) projections for present and future waste minimization and pollution prevention. The plan specifies those activities and methods that are or will be used to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) requirements. This Plan provides an overview of projected activities from FY 1994 through FY 1999. The plans are broken into site-wide and problem-specific activities. All directorates at LLNL have had an opportunity to contribute input, to estimate budget, and to review the plan. In addition to the above, this plan records LLNL`s goals for pollution prevention, regulatory drivers for those activities, assumptions on which the cost estimates are based, analyses of the strengths of the projects, and the barriers to increasing pollution prevention activities.

  8. Waste Minimization and Pollution Prevention Awareness Plan

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of this plan is to document Lawrence Livermore National Laboratory (LLNL) projections for present and future waste minimization and pollution prevention. The plan specifies those activities and methods that are or will be used to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) requirements. This Plan provides an overview of projected activities from FY 1994 through FY 1999. The plans are broken into site-wide and problem-specific activities. All directorates at LLNL have had an opportunity to contribute input, to estimate budget, and to review the plan. In addition to the above, this plan records LLNL's goals for pollution prevention, regulatory drivers for those activities, assumptions on which the cost estimates are based, analyses of the strengths of the projects, and the barriers to increasing pollution prevention activities

  9. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  10. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  11. [Dementia: management and prevention].

    Science.gov (United States)

    Daher, Oscar; Nguyen, Sylvain; Smith, Cindi; Büla, Christophe; Démonet, Jean-François

    2016-04-20

    Dementia represents a great challenge for health care providers. Detection of cognitive impairment is critical for early diagnosis of dementia. Early diagnosis allows to initiate individualized management that focuses on maintaining patient's autonomy and supporting their caregivers. Proposed multimodal interventions include physical activity, cognitive training, mediterranean diet, and management of cardiovascular risk factors. Before the initiation of pro-cognitive therapy, medication review is essential to evaluate current treament and determine specific therapeutic objectives, based on patient's overall health and preferences. Overall risk reduction for dementia revolves around similar measures that target physical activity, cognition, diet and management of cardiovascular risk factors.

  12. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  13. Developing formal asset management plans

    Science.gov (United States)

    2014-06-01

    This report highlights key recommendations and best practices identified at the peer exchange on Transportation Asset Management Plans (TAMP), held on February 5 and 6, 2014, in Columbia, South Carolina. This event was sponsored by the Transportation...

  14. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  15. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  16. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  17. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  18. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  19. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  20. Underground storage tank management plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  1. Business Continuity Management Plan

    Science.gov (United States)

    2014-12-01

    and management style . The four main elements are (Protiviti, 2013): 1. Scoping—This includes IT and/or business functions which may be internally...based on the results of the BIA. In order to develop a solid recovery strategy, the capability leadership team must have a thorough understanding of...action would be needed if capacity at the second site is inadequate. Telecommuting is a strategy employed when staff can work from home through remote

  2. A reservoir management plan

    Energy Technology Data Exchange (ETDEWEB)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  3. Pressure ulcer prevention and management.

    Science.gov (United States)

    Lyder, Courtney H

    2002-01-01

    This chapter reviews 218 published and unpublished research reports of pressure ulcer prevention and management by nurse researchers and researchers from other disciplines. The electronic databases MEDLINE (1966-July 2001), CINAHL (1982-June 2001), AMED (1985-July 2001), and EI Compedex Plus (1980-June 2001) were selected for the searches because of their focus on health and applied research. Moreover, evaluations of previous review articles and seminal studies that were published before 1966 are also included. Research conducted worldwide and published in English between 1930 and 2001 was included for review. Studies using descriptive, correlational, longitudinal, and randomized control trials were included. This review found that numerous gaps remain in our understanding of effective pressure ulcer prevention and management. Moreover, the majority of pressure ulcer care is derived from expert opinion rather than empirical evidence. Thus, additional research is needed to investigate pressure ulcer risk factors of ethnic minorities. Further studies are needed that examine the impact of specific preventive interventions (e.g., turning intervals based on risk stratification) and the cost-effectiveness of comprehensive prevention programs to prevent pressure ulcers. Finally, an evaluation is needed of various aspects of pressure ulcer management (e.g., use of support surfaces, use of adjunctive therapies) and healing of pressure ulcers.

  4. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  5. Waste Minimization/Pollution Prevention Crosscut Plan, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This plan establishes a Department-wide goal to reduce total releases of toxic chemicals to the environment and off-site transfers of such toxic chemicals by 50 percent by December 31, 1999, in compliance with Executive Order 12856. Each site that meets the threshold quantities of toxic chemicals established in the Emergency Planning and Community Right-to-Know Act (EPCRA) will participate in this goal. In addition, each DOE site will establish site-specific goals to reduce generation of hazardous, radioactive, radioactive mixed, and sanitary wastes and pollutants, as applicable. Implementation of this plan will represent a major step toward the environmental risks and costs associated with DOE operations and increasing the Department's use of preventive environmental management practices. Investing in Waste Minimization Pollution Prevention (WMin/PP) steadily reduce hazardous and radioactive waste generation and will reduce the need for waste management and unnecessary expenditures for waste treatment, storage, and disposal. A preventive approach to waste management will help solve current environmental and regulatory issues and reduce the need for costly future corrective actions. The purpose of this plan is to establish the strategic framework for integrating WMin/PP into all DOE internal activities. This program includes setting DOE policy and goals for reducing the generation of wastes and pollutants, increasing recycling activities, and establishing an infrastructure to achieve and measure the goals throughout the DOE complex. Waste Minimization and Pollution Prevention Awareness Plans, submitted to Headquarters by DOE field sites, will incorporate the WMin/PP activities and goals outlined in this plan. Success of the DOE WMin/PP program is dependent upon each field operation becoming accountable for resources used, wastes and pollutants generated, and wastes recycled

  6. Preventive management plans recorded by Dental Therapists and Oral Health Therapists using clinical vignettes for adolescents accessing Public Oral Health Services, NSW Australia.

    Science.gov (United States)

    Masoe, Angela V; Blinkhorn, Anthony S; Taylor, Jane; Blinkhorn, Fiona A

    2015-04-25

    To investigate factors that influence Dental Therapists and Oral Health Therapists (Therapists) plan preventive oral health care for adolescents attending New South Wales (NSW) Public Oral Health Services. A cross-sectional postal survey using two clinical vignettes were used to record the preventive care treatment plans offered by Therapists working across sixteen NSW Local Health Districts (LHDs). Data were tabulated and Chi square statistics were used in the analysis. One hundred and seventeen Therapists returned questionnaires giving a 64.6% response rate. The participants highlighted the importance of offering oral hygiene instruction (97.0%); dietary advice (95.0%) and topical fluoride applications (74.0%). Recommended home use products included fluoride toothpaste 5000ppmF (59.0%) and casein phosphopeptide amorphous phosphates plus fluoride (CPP-ACPF) paste (57.7%). Over 50% used fissure sealants. More respondents (88%) would utilise Motivational Interviewing strategies for a patient with dental caries concerns, however, only 63% would use this technique for a patient in pain (pdental disease, suggesting a need for Clinical Directors to consider providing more advice to Therapists on the scientific basis of preventing dental caries. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  7. Research Data Management - Data Management Plans

    OpenAIRE

    Collins, Anna

    2012-01-01

    This presentation covers what a Data Management Plan (DMP) is, why they are important, how to write a DMP, key considerations for a DMP, understanding your data and documenting it as you go (and backing up), cloud based storage, selecting data to save into the future and where to get help

  8. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  9. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  10. Design an effective storm water pollution prevention plan

    International Nuclear Information System (INIS)

    Vivona, M.A.

    1995-01-01

    A case history shows ''how'' to plan and organize a storm water pollution prevention program (SWPPP). Using easy-to-use worksheets and guidelines, hydrocarbon processing industry (HPI) operators can build upon existing best management practices (i.e., housekeeping procedures, visual inspections, spill prevention programs, etc.) to meet tighter restrictions set by National Pollutant Discharge Elimination system (NPDES) permits. Especially in high rainfall areas, storm water poses an intermittent, but large volume problem. The facility's site size is another factor that impacts the scope and cost for SWPPP. The five steps to implementing a SWPPP are: Planning and organization; Assessment; Best management practice (BMP) identification; Implementation; Evaluation and monitoring. Initially, HPI operators must identify all potential contamination sources and past spills and leak areas. Following the SWPP guidelines, operators can map out a cost-effective storm water program that meets all NPDES requirements

  11. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  12. Health professional's role in disaster planning: a strategic management approach.

    Science.gov (United States)

    Meyer, M U; Graeter, C J

    1995-05-01

    1. The Strategic Management for Total Quality in Health Care model incorporates strategic management methods and total quality principles to enhance management of complex, interdisciplinary projects. 2. The purpose of disaster planning is to provide an effective and efficient plan to prevent personal injury and limit property damage and capital losses, as well as return to full production after a disaster. 3. Participation in disaster response planning provides health professionals with an opportunity to demonstrate the benefits they can provide for meeting their company's business needs. 4. Disaster planning is a complex, interdisciplinary project that requires a strategic management framework to facilitate development of high quality, cost effective programs.

  13. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  14. Strategic Management or Strategic Planning for Defense?

    Science.gov (United States)

    1989-02-01

    strategic management within DoD. Authors offer a series of suggested reforms to enhance mono-level planning and management within DoD, primarily by closer ties with industry planning groups, education, organizational structure, management information systems, and better integration. Additional sponsors are: OSD competitive Strategies Office, OSD Strategic Planning Branch, and the National Security Council Staff. Strategic management , Military organization, Education, Long range planning, Competitive strategies, DoD, Strategic planning, Curriculum

  15. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  16. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    1994-05-01

    The Hanford Site WMin/P2 program is an organized, comprehensive, and continual effort to systematically reduce the quantity and toxicity of hazardous, radioactive, mixed, and sanitary wastes; conserve resources; and prevent or minimize pollutant releases to all environmental media from all Site activities. The Hanford Site WMin/P2 program plan reflects national and DOE waste minimization and pollution prevention goals and policies, and represents an ongoing effort to make WMin/P2 part of the Site operating philosophy. In accordance with these policies, a hierarchical approach to environmental management has been adopted and is applied to all types of polluting and waste generating activities. Pollution prevention and waste minimization through source reduction are first priority in the Hanford WMin/P2 program, followed by environmentally safe recycling. Treatment to reduce the quantity, toxicity, and/or mobility will be considered only when prevention or recycling are not possible or practical. Environmentally safe disposal is the last option

  17. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  18. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  19. Strategy and Management Guideline on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    An action-oriented and practical guideline for the planning, organisation and management of preventive school maintenance in Eritrea. The manual is the result of a participatory planning process which has involved actors at the school and community level, district levels and the national policy...

  20. Managed care, consumerism, preventive medicine: does a causal connection exist?

    Science.gov (United States)

    Rizzo, John A; Xie, Yang

    2006-07-01

    Managed care plans, and HMOs in particular, have long touted that their emphasis is on preventive care, to avoid expensive illness later in life. However, few articles in the contemporary literature adequately address this claim. The available evidence seems to support that HMOs do, in fact, provide greater access to preventive services, but the limitations of this research are substantial. This article discusses the scientific evidence on the relationships between managed care arrangements and the implications for preventive care in the current era, emphasizing consumer choices and less-restrictive plan structures.

  1. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  2. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  3. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  4. Waste minimization and pollution prevention awareness plan

    International Nuclear Information System (INIS)

    1994-08-01

    The primary mission of DOE/NV is to manage and operate the Nevada Test Site (NTS) and other designated test locations, within and outside the United States; provide facilities and services to DOE and non-DOE NTS users; and plan. coordinate, and execute nuclear weapons tests and related test activities. DOE/NV also: (a) Supports operations under interagency agreements pertaining to tests, emergencies, and related functions/activities, (b) Plans, coordinates, and executes environmental restoration, (c) Provides support to the Yucca Mountain Site Characterization Project Office in conjunction with DOE/HQ oversight, (d) Manages the Radioactive Waste Management Sites (RWMS) for disposal of low-level and mixed wastes received from the NTS and off-site generators, and (e) Implements waste minimization programs to reduce the amount of hazardous, mixed, radioactive, and nonhazardous solid waste that is generated and disposed The NTS, which is the primary facility controlled by DOE/NV, occupies 1,350 square miles of restricted-access, federally-owned land located in Nye County in Southern Nevada. The NTS is located in a sparsely populated area, approximately 65 miles northwest of Las Vegas, Nevada

  5. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  6. Necedah National Wildlife Refuge furbearer management plan

    Data.gov (United States)

    Department of the Interior — This Furbearer Management Plan for the Necedah National Wildlife Refuge is one of several step-down plans identified in the Refuge’s Comprehensive Conservation Plan...

  7. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    .... As a result, DoD has prepared the Financial Management Improvement Plan (the Plan), which is a strategic framework that includes the Departments financial management concept of operations for the future...

  8. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  9. AEGIS: a wildfire prevention and management information system

    Science.gov (United States)

    Kostas Kalabokidis; Alan Ager; Mark Finney; Nikos Athanasis; Palaiologos Palaiologou; Christos Vasilakos

    2016-01-01

    We describe a Web-GIS wildfire prevention and management platform (AEGIS) developed as an integrated and easy-to-use decision support tool to manage wildland fire hazards in Greece (http://aegis.aegean.gr). The AEGIS platform assists with early fire warning, fire planning, fire control and coordination of firefighting forces by providing online access to...

  10. Evaluating spatially explicit burn probabilities for strategic fire management planning

    Science.gov (United States)

    C. Miller; M.-A. Parisien; A. A. Ager; M. A. Finney

    2008-01-01

    Spatially explicit information on the probability of burning is necessary for virtually all strategic fire and fuels management planning activities, including conducting wildland fire risk assessments, optimizing fuel treatments, and prevention planning. Predictive models providing a reliable estimate of the annual likelihood of fire at each point on the landscape have...

  11. Planning and Nuclear Knowledge Management

    International Nuclear Information System (INIS)

    Grance Torales, V.L.; Lira, L.

    2016-01-01

    Full text: The present case aims to share the experience of the Intellectual Capital Section (ICS), part of Planning, Coordination and Control Department of the Argentine Atomic Energy Commission (CNEA) in its search for a sustainable knowledge management. Among the strategic objectives included in CNEA’s Strategic Plan (SP), is the development, preservation and transference of knowledge and experience. Under this framework, the role initially assumed by the ICS, consisted on the observation and diagnosis of the situation of the Institutional Human Capital (HC), through the study of the main characteristics of the staff of CNEA. The second stage of SP (2015–2025), which consisted of updating the HC data, the incorporation of the concept of “knowledge management” was approved by the authorities of the Institution. Based on this background, in 2016 the objectives of the ICS are aimed at organizing and coordinating a network of knowledge management that involves the entire organization. This new phase implies, among other things, the proposal of a knowledge management policy, interaction with other sectors of CNEA for implementation, analysis of the tools to be used, in order to determine a way and work style that suits the culture and structure of the organization. (author

  12. Liquidity management through financial planning

    Directory of Open Access Journals (Sweden)

    Kameníková Katarína

    2001-12-01

    Full Text Available One of the basic goals of financial management is to provide financial property and capital for running of the firm, as well as for its development, that means provide optimal firm´s liquidity.To improve liquidity is possible provide through various ways. In present time there is increasing importance of financial planning., where planning of liquidity presents one of its integral part. Therefore I deal in presented paper with possible liquidity improvement through calculation of financial planning in chosen slovac magnesite firm, exploitating and elaborating magnesite raw material.For creating of financial plann of liquidity I chosed to use one of the practical methods - method of financial indexes. Such method presents process of planning optimal liquidity with providing of required rentability. Such plann must provide balance between income and outcome, as well as secure achievment of expected profit.I used tools of financial planning for calculation of possible liquidity improvement in mentioned firm, where present financial situation is characterised by law liquidity, but high rentability. Such position presents transitive crisis situation, therefore firm must create new financial property or decrease liabilities, in order to overcome negative state of liquidity.Performed calculation showed, that change in balance sheet due to the growth of financial property will improve liquidity, rentability will be maintained, therefore firm will be able to transit from crisis situation.Providing of liquidity will present one of possible way how to care for financial health of firm. But such process is not simple, it must be done with connection to the changes of internal and external conditions of the firm.

  13. Crisis management and crisis prevention

    International Nuclear Information System (INIS)

    Wallensteen, P.

    1988-01-01

    This paper reports that many proposals have come forth to ease the tension between East and West. Some focus on arms developments, others take up diplomatic issues. In addition, some have raised the question of crisis management and crisis prevention. Can crises be prevented even before they have taken place? The Palme Commission on Disarmament and Security suggested, in its 1982 report, ways of restraining superpower involvement in Third World conflicts. Such conflicts, it was argued, could escalate and ultimately result in nuclear confrontation between the United States and the Soviet Union. Certainly, the commission also paid attention to conflicts over issues in Europe and to problems in Eastern or in Western Europe. However, the commission raised a question that lately has received increasing attention: the dangers of superpower confrontation over Third World issues. In his statement to the United Nations on 24 October 1985, President Regan pointed to the need for settling regional conflicts as they play a large role in building suspicions and tensions. Regan's initiative explicitly concerned Afghanistan, Cambodia, Ethiopia, Angola and Nicaragua. It included negotiations with the Soviet Union over Afghanistan, and, at a later stage, also over other issues. The goal, he the, was not to force a settlement on the parties. The initiative concerned issues that have for the American public, justified armaments and reduced Soviet credibility

  14. Prevention and management of gastroesophageal varices.

    Science.gov (United States)

    Seo, Yeon Seok

    2018-03-01

    Bleeding from gastroesophageal varices is a serious complication in patients with liver cirrhosis and portal hypertension. Although there has been significance improvement in the prognosis of variceal bleeding with advancement in diagnostic and therapeutic modalities for its management, mortality rate still remains high. Therefore, appropriate prevention and rapid, effective management of bleeding from gastroesophageal varices is very important. Recently, various studies about management of gastoesophageal varices, including prevention of development and aggravation of varices, prevention of first variceal bleeding, management of acute variceal bleeding, and prevention of variceal rebleeding, have been published. The present article reviews published articles and practice guidelines to present the most optimal management of patients with gastroesophageal varices.

  15. Severe accident management. Prevention and Mitigation

    International Nuclear Information System (INIS)

    1992-01-01

    Effective planning for the management of severe accidents at nuclear power plants can produce both a reduction in the frequency of such accidents as well as the ability to mitigate their consequences if and when they should occur. This report provides an overview of accident management activities in OECD countries. It also presents the conclusions of a group of international experts regarding the development of accident management methods, the integration of accident management planning into reactor operations, and the benefits of accident management

  16. Overview of the Hanford risk management plan

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  17. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  18. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  19. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  20. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden concerning the plans for the final disposal of the radioactive waste products of the nuclear power. Part 2 describes the waste facilities in details. The layouts and estimated costs are presented. The decomissioning of nuclear power plants and the postponement of it is discussed. (G.B.)

  1. Improved product planning by problem-oriented use of preventive quality management methods; Verbesserte Produktplanung durch den problemorientierten Einsatz praeventiver Qualitaetsmanagementmethoden

    Energy Technology Data Exchange (ETDEWEB)

    Lesmeister, F.

    2001-07-01

    The development of innovative products meeting the customer's needs is getting increasingly complex. The production cost and the time to market must be reduced constantly. Modern methods of preventive quality management like QFD, FMEA and Target Costing offer help but they tend to be complex and costly. The author attempted a modularisation of the methods, with the possibility of linking modules as desired using a commercially available software. [German] Die Entwicklung innovativer, den Kundenbeduerfnissen entsprechender Produkte wird zunehmend komplexer. Die Unternehmen sind gezwungen, die Kosten der Produkterstellung stetig zu reduzieren und den Time-to-Market zu verkuerzen. Moderne Methoden des praeventiven Qualitaetsmanagements wie das QFD, die FMEA und das Target Costing bieten Unterstuetzungsmoeglichkeiten zur Loesung der damit zusammenhaengenden Probleme. Doch ist der Einsatz der oft komplizierten Methoden sehr aufwendig. Gruende hierfuer sind die oft starren Anwendungsschemata, die einem situationsspezifischen Einsatz der Methoden entgegenstehen, und die fehlende Verknuepfung der Methoden. Ergebnis der Arbeit ist eine Modularisierung der Methoden und eine Verknuepfung der einzelnen Methodenmodule. Hierdurch koennen die Methoden an die jeweilige Problemsituation angepasst eingesetzt und dadurch der gesamte Produktentwicklungsprozess durchgaengig unterstuetzt werden. Die Anwendung der Methoden wird mittels einer auf dem Markt erhaeltlichen Software unterstuetzt. (orig.)

  2. Hoshin Planning Applies Total Quality Management to the Planning Process.

    Science.gov (United States)

    Heverly, Mary Ann; Parker, Jerome S.

    1993-01-01

    Hoshin, or breakthrough, planning is the Total Quality Management method of integrating strategic planning into the daily work of organizational units. Delaware County (Pennsylvania) Community College's adaptation of the process and its use in daily management are described and presented in the form of a flow chart. (MSE)

  3. Hanford site ground water protection management plan

    International Nuclear Information System (INIS)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities

  4. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  5. Complications of Blepharoplasty: Prevention and Management

    Directory of Open Access Journals (Sweden)

    James Oestreicher

    2012-01-01

    Full Text Available Blepharoplasty is an operation to modify the contour and configuration of the eyelids in order to restore a more youthful appearance. The surgery involves removing redundant skin, fat, and muscle. In addition, supporting structures such as canthal tendons are tightened. Other conditions such as ptosis, brow ptosis, entropion, ectropion, or eyelid retraction may also need to be corrected at the time a blepharoplasty is performed to ensure the best functional and aesthetic result. Due to the complexity and intricate nature of eyelid anatomy, complications do exist. In addition to a thorough pre operative assessment and meticulous surgical planning, understanding the etiology of complications is key to prevention. Finally, management of complications is just as important as surgical technique.

  6. Complications of blepharoplasty: prevention and management.

    Science.gov (United States)

    Oestreicher, James; Mehta, Sonul

    2012-01-01

    Blepharoplasty is an operation to modify the contour and configuration of the eyelids in order to restore a more youthful appearance. The surgery involves removing redundant skin, fat, and muscle. In addition, supporting structures such as canthal tendons are tightened. Other conditions such as ptosis, brow ptosis, entropion, ectropion, or eyelid retraction may also need to be corrected at the time a blepharoplasty is performed to ensure the best functional and aesthetic result. Due to the complexity and intricate nature of eyelid anatomy, complications do exist. In addition to a thorough pre operative assessment and meticulous surgical planning, understanding the etiology of complications is key to prevention. Finally, management of complications is just as important as surgical technique.

  7. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  8. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  9. Oak Ridge Reservation Waste Management Plan

    International Nuclear Information System (INIS)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year

  10. Waste management plan for the APT

    International Nuclear Information System (INIS)

    England, J.L.

    1997-01-01

    This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required

  11. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  12. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  13. Oak Ridge National Laboratory Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  14. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  15. Medicare Managed Care plan Performance, A Comparison...

    Data.gov (United States)

    U.S. Department of Health & Human Services — The study evaluates the performance of Medicare managed care, Medicare Advantage, Plans in comparison to Medicare fee-for-service Plans in three states with...

  16. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  17. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  18. Report on the behalf of the Finance, General Economy and Budgetary Control Commission on the Finance bill for 2011 (n. 2824), appendix N. 13: ecology, sustainable development and land planning, hazard prevention, management and steering of ecology, energy, sustainable development, land planning and sea policies

    International Nuclear Information System (INIS)

    2010-01-01

    This report comments the grants awarded to two programmes, the first one concerning the prevention of hazards, and the second concerning the management and steering of ecology, energy, sustainable development, land planning and sea policies. These two programmes are emblematic of the French government's action and ambition in the field of sustainable development and ecology. For the first one, the report comments the evolution of grants, their objectives and performance indicators. Then it addresses its various aspects: prevention of technological hazards and pollutions, prevention of natural and hydraulic hazards, nuclear safety, after-mine management. For the second programme, the report gives an assessment of the ministry reorganization, and comments the means requested for 2011

  19. Regional Management Plan: Summary report

    International Nuclear Information System (INIS)

    Drobny, N.L.

    1986-01-01

    This summary report describes the results of a 16-month project to develop a Regional Management Plan for low-level radioactive waste management in a seven-state area. The seven states are Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio, and Wisconsin. These states have formed the Midwest Interstate Low-Level Radioactive Waste Commission in accord with Congressional requirements established in 1980. What is low-level radioactive waste? Low-level radioactive waste results from the use of radioactive materials in the treatment of disease, the production of consumer goods and industrial products, and from the generation of electricity at nuclear power plants. Low-level wastes, which are a responsibility of the states, are grouped into three classes, A, B, and C; this classification scheme is prescribed by Federal Regulations and represents different degrees of hazard associated with different concentrations of radioactive materials. Class A wastes are the least hazardous. Classes B and C represent higher hazard classes. 14 refs., 13 figs., 9 tabs

  20. Nurse manager succession planning: a concept analysis.

    Science.gov (United States)

    Titzer, Jennifer L; Shirey, Maria R

    2013-01-01

    The current nursing leadership pipeline is inadequate and demands strategic succession planning methods. This article provides concept clarification regarding nurse manager succession planning. Attributes common to succession planning include organizational commitment and resource allocation, proactive and visionary leadership approach, and a mentoring and coaching environment. Strategic planning, current and future leadership analysis, high-potential identification, and leadership development are succession planning antecedents. Consequences of succession planning are improved leadership and organizational culture continuity, and increased leadership bench strength. Health care has failed to strategically plan for future leadership. Developing a strong nursing leadership pipeline requires deliberate and strategic succession planning. © 2013 Wiley Periodicals, Inc.

  1. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  2. Lucas Heights buffer zone: plan of management

    International Nuclear Information System (INIS)

    1986-01-01

    This plan is being used by the Commission as a guide for its management of the Lucas Heights buffer zone, which is essentially a circular area having a 1-6 km radius around the HIFAR reactor. Aspects covered by this plan include past uses, current use, objectives for buffer zone land management, emergency evacuation, resource conservation, archaeology, fire, access, rehabilitation of disturbed areas, resource management and plan implementation

  3. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  4. To manage is human, to prevent is divine

    International Nuclear Information System (INIS)

    Nye, J.S. Jr.

    1985-01-01

    There is no simple solution to the political problem of proliferation. But political wisdom begins with efforts to maintain the existing regime and the presumption against proliferation. In this regard, the Reagan administration has hewed to the previous main lines of American policy. Some critics find it fashionable to talk about ''managing proliferation.'' But proliferation management requires a strategy for prevention - a plan for dealing with the steps before, not just after, a nuclear explosion. Without some prevention, the task of management may become untenable. An effective nonproliferation policy is not easy to design or implement, but one must exist

  5. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  6. Plan of environmental management, Metro (railway)

    International Nuclear Information System (INIS)

    Jaramillo Perez, Jorge A.

    1996-01-01

    The present article, tries to rescue and to put to the readers' consideration some of the most excellent aspects in the Plan of Environmental management of the Metro - PMAM. This study was carried out by a multidisciplinary group, in its majority professors of the Antioquia university, and summoned by the Center of Environmental Investigations of the Ability of Engineering. It is convenient to remember that in a Plan of Environmental management - PMA settles down the actions that are required to prevent, to mitigate, to control, to compensate and to correct the possible negative environmental impacts and potential the positive ones caused by the execution or operation of a project, it works or activity. A PMA also includes the pursuit plans, evaluation, monitored and contingency, and it is the result of the Study of Environmental Impact - EIA. It is of scoring that the EIA that possesses the METRO, on which it is supposed this PMA would consolidate, one carries out responding to conditions that, 10 years later, they were surpassed by the expectations of the time, and in some cases its considerations don't satisfy the current demands; however neither it is exactly to evaluate now, when there is a perception different from the reality, those conclusions that it tried to predict derived future events of the construction and the operation of the Metropolitan Train in their moment. Therefore, this studies it tries to rescue those recommendations that still have validity and it tries to contribute, starting from an interdisciplinary encounter some recommendations, translated to programs, projects and actions that guide the Management for the taking of decisions in the terminal phase and the Commercial Operation of the METRO, toward the future

  7. Use of quality management methods in the transition from efficacious prevention programs to effective prevention services.

    Science.gov (United States)

    Daniels, Vicki-Smith; Sandler, Irwin; Wolchik, Sharlene

    2008-06-01

    This paper applies concepts and methods developed in management to translate efficacious prevention programs into effective prevention services. The paper describes Quality Function Deployment (QFD) as a method for structured planning and development that connects the needs and wants of the consumer with the design of the product or service. The paper describes basic tools used in quality management, and discusses how they might be applied to prepare a prevention program for implementation by community agencies. Prevention programs are conceptualized as having multiple consumers (i.e., stakeholders), including the participants who receive the service, the service providers, the organizations that deliver the program, and the researchers who evaluate the programs. As an illustration of one step in the application of QFD to translate efficacious prevention programs into effective prevention services, analysis of the needs and preferences of Family Courts for the implementation of an the New Beginnings Program is presented.

  8. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  9. Impact of the Prevention Plan on Employee Health Risk Reduction

    OpenAIRE

    Loeppke, Ronald; Edington, Dee W.; Bég, Sami

    2010-01-01

    This study evaluated the impact of The Prevention Plan™ on employee health risks after 1 year of integrated primary prevention (wellness and health promotion) and secondary prevention (biometric and lab screening as well as early detection) interventions. The Prevention Plan is an innovative prevention benefit that provides members with the high-tech/high-touch support and encouragement they need to adopt healthy behaviors. Support services include 24/7 nurse hotlines, one-on-one health coach...

  10. Waste minimization and pollution prevention awareness plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The purpose of this plan is to document Lawrence Livermore National Laboratory (LLNL) projections for present and future waste minimization and pollution prevention. The plan specifies those activities and methods that are or will be used to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) requirements. This Waste Minimization and Pollution Prevention Awareness Plan provides an overview of projected activities from FY 1994 through FY 1999. The plans are broken into site-wide and problem-specific activities. All directorates at LLNL have had an opportunity to contribute input, estimate budgets, and review the plan. In addition to the above, this plan records LLNL`s goals for pollution prevention, regulatory drivers for those activities, assumptions on which the cost estimates are based, analyses of the strengths of the projects, and the barriers to increasing pollution prevention activities.

  11. Waste minimization and pollution prevention awareness plan. Revision 1

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to document Lawrence Livermore National Laboratory (LLNL) projections for present and future waste minimization and pollution prevention. The plan specifies those activities and methods that are or will be used to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) requirements. This Waste Minimization and Pollution Prevention Awareness Plan provides an overview of projected activities from FY 1994 through FY 1999. The plans are broken into site-wide and problem-specific activities. All directorates at LLNL have had an opportunity to contribute input, estimate budgets, and review the plan. In addition to the above, this plan records LLNL's goals for pollution prevention, regulatory drivers for those activities, assumptions on which the cost estimates are based, analyses of the strengths of the projects, and the barriers to increasing pollution prevention activities

  12. Adverse Drug Event Prevention: 2014 Action Plan Conference.

    Science.gov (United States)

    Ducoffe, Aaron R; Baehr, Avi; Peña, Juliet C; Rider, Briana B; Yang, Sandra; Hu, Dale J

    2016-09-01

    Adverse drug events (ADEs) have been highlighted as a national patient safety and public health challenge by the National Action Plan for Adverse Drug Event Prevention (ADE Action Plan), which was released by the Office of Disease Prevention and Health Promotion in August 2014. The following October, the ADE Prevention: 2014 Action Plan Conference provided an opportunity for federal agencies, national experts, and stakeholders to coordinate and collaborate in the initiative to reduce preventable ADEs. The single-day conference included morning plenary sessions focused on the surveillance, evidence-based prevention, incentives and oversights, and additional research needs of the drug classes highlighted in the ADE Action Plan: anticoagulants, diabetes agents, and opioids. Afternoon breakout sessions allowed for facilitated discussions on measures for tracking national progress in ADE prevention and the identification of opportunities to ensure safe and high-quality health care and medication use. © The Author(s) 2015.

  13. Work hazard prevention plans; Plan de prevencion de riesgos laborales

    Energy Technology Data Exchange (ETDEWEB)

    Albertos Campos, F.

    2009-07-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  14. Nr 251 - Report on the behalf of the Commission of finances, general economy and budget control on the finance bill project for 2013. Appendix Nr 13: ecology, sustainable development and planning, risk prevention, management and steering of policies of ecology, energy, sustainable development and sea

    International Nuclear Information System (INIS)

    Eckert, Christian; Mariton, Herve

    2012-01-01

    After having indicated some key figures (public finances and budgets awarded to different involved institutions and agencies), this report comments and discusses the various challenges and financial aspects regarding risk prevention: evolution of endowments in 2013, action in the field of prevention of technological risks and pollutions, issue of nuclear safety after the Fukushima accident (actions undertaken by the ASN, IRSN and ANDRA), assessment of the implementation of the PPRN (plan of prevention of natural risks) and management of flood risks, management of the after-mine period. The second part discusses the management and steering of policies of ecology, energy, sustainable development and sea in a context of decreased endowments

  15. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  16. The United Kingdom's School Asset Management Plans.

    Science.gov (United States)

    Jones, Alan

    1999-01-01

    Examines the U.K.'s Asset Management Plans (AMPs) designed to help Local Education Authorities (LEAs) identify and address the most important priorities in their school capital programs, and to help in their longer term planning and management of the school estate. Discusses AMP objectives, the stages of developing an AMP, and how the Department…

  17. Managing Dualities in Planned Change Initiatives

    Science.gov (United States)

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  18. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  19. MANAGING BUILDING CHECKIST PLANS USING BUSCLIS

    Directory of Open Access Journals (Sweden)

    M. Zulfahmi Toh

    2016-02-01

    Full Text Available This paper presents the software namely Building Submission Checklist System (BUSCLIS. It has been developed to manage the submission of building checklist plans process in the construction industry. BUSCLIS helps to simplify the management for acquiescence data of building plan approval for the Local Authority (LA and Country Planning in Malaysia through the web based system. BUSCLIS facilitates user through the computerization forms, which provides fast, efficient and effective service to the engineer, architect and contractor. Relevant and timely information manage by sophisticated BUSCLIS with the database management system MySQL

  20. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of

  1. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    or jurisdiction. The paper then identifies the different means of planning control such as a centralized versus a decentralized approach and planning led versus a market marked led approach. This is presented in a European context through a short overview of the various planning systems that reflect...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...... it shortly: “Planning is politics”....

  2. Evaluation plan and recommendations - ‘Can’t Wait to be Healthy’: A briefing paper on evaluation for Leeds Childhood Obesity Prevention and Weight Management Strategy.

    OpenAIRE

    South, J; Kime, NH

    2008-01-01

    The rise in childhood obesity is a major public health challenge and a national priority for health action. Obesity is associated with many illnesses and is directly related to increased mortality and lower life expectancy. The Children’s Plan recognises child obesity as one of the most serious challenges for children and links it to a number of poor outcomes, physical, social and psychological (Department for Children, Schools and Families 2007). ‘Can’t wait to be healthy’- Leeds Childhood O...

  3. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  4. Developing the strategic plan for pollution prevention in defense programs

    International Nuclear Information System (INIS)

    Marchetti, John A.; Betschart, James F.; Suffern, J. Samuel

    1992-01-01

    In order to provide effective leadership and to ensure a consistent pollution prevention effort in all of its production facilities and laboratories, Defense Programs (DP) Headquarters, in close cooperation with the Field, has developed a strategic plan for its Pollution Prevention Program. The strategic plan is built upon the history of waste minimization, waste reduction, and pollution prevention activity to date, and articulates both long- and short-term strategies to ensure program initiation, growth, and stability. The organization of the program, including Headquarters staffing and linkages to the Geld, is described. Life-cycle analysis of program barriers and bottlenecks, along with associated initiatives and action plans are discussed. (author)

  5. [Evaluation model for municipal health planning management].

    Science.gov (United States)

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  6. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  7. Pressure ulcers: prevention and management.

    Science.gov (United States)

    Dib, Mansour

    2008-01-01

    Pressure ulcers are a significant medical problem that greatly affects the geriatric population. We reviewed pertinent published data in the literature concerning the prevention and treatment of pressure ulcers. The development of pressure ulcers is associated with well known risk factors including unrelieved pressure, skin maceration, shear forces, malnutrition and immobility. Risk factor modification is an important aspect in prevention and treatment. When a pressure ulcer develops, various specialized support surfaces and wound care products exist to accelerate wound healing. Alternative therapeutic modalities such as ultrasonic mist and wound vacuum therapy are increasingly being used with success for such ulcers. Pressure ulcers are typically the consequence of underlying medical conditions that should be treated appropriately in order for the wound to heal.

  8. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  9. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  10. Lake Superior Aquatic Invasive Species Complete Prevention Plan

    Science.gov (United States)

    The Lake Superior Aquatic Invasive Species Complete Prevention Plan is an expression of the best professional judgment of the members of the Lake Superior Task Force as to what is necessary to protect Lake Superior from new aquatic invasive species.

  11. LLNL Site 200 Risk Management Plan

    International Nuclear Information System (INIS)

    Pinkston, D.; Johnson, M.

    2008-01-01

    It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES and H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES and H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March

  12. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  13. Waste Isolation Pilot Plant, Land Management Plan

    International Nuclear Information System (INIS)

    1993-01-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives

  14. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  15. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  16. Prevention and management of outpatient pediatric burns.

    Science.gov (United States)

    O'Brien, Shannon P; Billmire, David A

    2008-07-01

    Burns are common injuries in the pediatric population, with an estimated 250,000 pediatric burn patients seeking medical care annually. A relative few require inpatient management. This article discusses suggestions for burn prevention, as well as acute burn care and long-term management of small burns.

  17. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  18. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  19. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  20. Kentucky's highway incident management strategic plan.

    Science.gov (United States)

    2005-06-01

    Kentucky s Highway Incident Management Strategic Plan consists of a mission statement, 4 goals, 16 objectives, and 49 action strategies. The action strategies are arranged by priority and recommended time frame for implementation. When implemented...

  1. Managing infrastructure and underpinning the planned environment

    CSIR Research Space (South Africa)

    Wall, K

    2008-04-01

    Full Text Available Planning the built environment is, or should be, also about providing and managing (i.e. operating and maintaining) this environment, viz. the engineering infrastructure (much of which is underground), structures and public amenities. However, never...

  2. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  3. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    Energy Technology Data Exchange (ETDEWEB)

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  4. Introduction to Soil Fumigant Management Plans

    Science.gov (United States)

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  5. MDOT Materials Laboratories : Environmental Management Plan

    Science.gov (United States)

    2012-06-01

    The goal of this EMP was to develop and implement a comprehensive Environmental : Management Plan for MDOT Materials Laboratories. This goal was achieved through : perfonnance of environmental audits to identify potential environmental impacts, and b...

  6. Special event planning for the emergency manager.

    Science.gov (United States)

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan.

  7. Livermore Site Spill Prevention, Control, and Countermeasures Plan, May 2017

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mertesdorf, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-05-01

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil.

  8. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  9. Time-Management Planning for Educational Facilities.

    Science.gov (United States)

    McIsaac, Donald N.; And Others

    Three conference papers concerned with systems analysis and time management planning. One paper is concerned with techniques, especially the application of the "critical path method" or PERT (Program Evaluation Review Technique) in planning construction activities. A second paper concerns problems associated with collecting and communicating…

  10. Draft of the PHENIX Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants

  11. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  12. HealthMap: a cluster randomised trial of interactive health plans and self-management support to prevent coronary heart disease in people with HIV.

    Science.gov (United States)

    Dodson, Sarity; Klassen, Karen M; McDonald, Karalyn; Millard, Tanya; Osborne, Richard H; Battersby, Malcolm W; Fairley, Christopher K; Simpson, Julie A; Lorgelly, Paula; Tonkin, Andrew; Roney, Janine; Slavin, Sean; Sterjovski, Jasminka; Brereton, Margot; Lewin, Sharon R; Crooks, Levinia; Watson, Jo; Kidd, Michael R; Williams, Irith; Elliott, Julian H

    2016-03-05

    The leading causes of morbidity and mortality for people in high-income countries living with HIV are now non-AIDS malignancies, cardiovascular disease and other non-communicable diseases associated with ageing. This protocol describes the trial of HealthMap, a model of care for people with HIV (PWHIV) that includes use of an interactive shared health record and self-management support. The aims of the HealthMap trial are to evaluate engagement of PWHIV and healthcare providers with the model, and its effectiveness for reducing coronary heart disease risk, enhancing self-management, and improving mental health and quality of life of PWHIV. The study is a two-arm cluster randomised trial involving HIV clinical sites in several states in Australia. Doctors will be randomised to the HealthMap model (immediate arm) or to proceed with usual care (deferred arm). People with HIV whose doctors are randomised to the immediate arm receive 1) new opportunities to discuss their health status and goals with their HIV doctor using a HealthMap shared health record; 2) access to their own health record from home; 3) access to health coaching delivered by telephone and online; and 4) access to a peer moderated online group chat programme. Data will be collected from participating PWHIV (n = 710) at baseline, 6 months, and 12 months and from participating doctors (n = 60) at baseline and 12 months. The control arm will be offered the HealthMap intervention at the end of the trial. The primary study outcomes, measured at 12 months, are 1) 10-year risk of non-fatal acute myocardial infarction or coronary heart disease death as estimated by a Framingham Heart Study risk equation; and 2) Positive and Active Engagement in Life Scale from the Health Education Impact Questionnaire (heiQ). The study will determine the viability and utility of a novel technology-supported model of care for maintaining the health and wellbeing of people with HIV. If shown to be effective, the HealthMap model

  13. Information management in process planning

    NARCIS (Netherlands)

    Lutters, Diederick; Wijnker, T.C.; Kals, H.J.J.

    1999-01-01

    A recently proposed reference model indicates the use of structured information as the basis for the control of design and manufacturing processes. The model is used as a basis to describe the integration of design and process planning. A differentiation is made between macro- and micro process

  14. Louisiana Marsh Management Plan 1995

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We sampled experimental research areas in the Barataria Basin of Louisiana during March and May, 1995, to examine the effects of structural marsh management on...

  15. Site 300 Spill Prevention, Control, and Countermeasures (SPCC) Plan

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mertesdorf, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-12-01

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).

  16. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  17. New plan to prevent female infanticide mooted.

    Science.gov (United States)

    1999-06-05

    The Campaign Against Female Infanticide in Tamil Nadu (CAFIT), sponsored by the Union Ministry of Human Resource Development, has brought to light a quadrangular model for the prevention of the social evil of female infanticide. The existence of female infanticide, according to the CAFIT, exposed the deplorable condition of women in society and reflected the perpetuation of customary and traditional practices in the sociocultural life of the people. The practice was associated with militant communities and other weaker segments living in less developed regions and with backward pockets marked by illiteracy, superstition, poverty, indebtedness, fear of liability, and emotional attachments to the soil and to cults. This paper also indicates the following preventive measures against female infanticide that are aimed at empowering women: establishing self-help groups and the sanction of micro credit for women in order to facilitate economic development, establishing rural and agriculture-based small-scale industries in order to generate local self-employment, and synchronization of crop insurance and marketing facilities in order to facilitate the provision of appropriate compensation in the event of crop failure caused by natural disasters.

  18. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  19. Teacher Plan Book. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    Project MET (Management for Effective Teaching) is a pilot project that provides effective, practical ways of managing the Fairfax County (Virginia) Public School system's instructional Program of Studies (POS) for elementary school students. This planning booklet is a part of the support kit that is used by teachers as an aid to implementing…

  20. Planning, Designing and Managing Higher Education Institutions

    Science.gov (United States)

    Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig

    2005-01-01

    The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…

  1. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  2. Environmental Release Prevention and Control Plan

    International Nuclear Information System (INIS)

    Mamatey, A.; Arnett, M.

    1997-01-01

    During the history of SRS, continual improvements in facilities, process, and operations, and changes in the site''s mission have reduced the amount of radioactive liquid releases. In the early years of SRS (1958 to 1965), the amount of tritium discharged to the Savannah River averaged approximately 61,000 curies a year. During the mid-1980''s (1983 to 1988), liquid releases of tritium averaged 27,000 curies a year. By 1996, liquid releases of tritium are projected to be just 3000 curies for the year. This large projected decrease is the result of the planned shut-down of all reactors and the anticipated significant decline in the amount of tritium migrating from the site seepage basins and the Solid Waste Disposal Facility

  3. Hanford site pollution prevention plan progress report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Kirkendall, J.R.

    1996-08-26

    This report tracks progress made during 1995 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307,`Plans,` for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, `Waste Reduction,` an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in- process reuse or reclamation of valuable spent material.

  4. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  5. Management plan for the Nuclear Standards Program

    Energy Technology Data Exchange (ETDEWEB)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy.

  6. Conservation Management Plan as a cultural heritage protection methodology

    OpenAIRE

    Rafał, Trzaska

    2018-01-01

    In this paper author describe how important is conservation management plan. Conservation management plan do not have support in law articles, therefore authors which create documents (documents in meaning conservation management plans) have not defined what they should put in to it. In this case, wrong written conservation management plan often is harmful than helpful for conservation management process.

  7. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and

  8. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the

  9. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1994-11-01

    The purpose of this plan is to establish the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program and outline the activities and schedules that will be employed to reduce the quantity and toxicity of wastes generated as a result of restoration and remediation activities. It is intended to satisfy the US Department of Energy (DOE) and other legal requirements. As such, the Pollution Prevention Awareness program required by DOE Order 5400.1 is included with the Pollution Prevention Program. This plan is also intended to aid projects in meeting and documenting compliance with the various requirements for WMin/P2, and contains the policy, objectives, strategy, and support activities of the WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Various pollution prevention techniques will be implemented with the support of employee training and awareness programs to reduce waste and still meet applicable requirements. Information about the Hanford Site is in the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan

  10. Hanford cultural resources management plan

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  11. Parking management : strategies, evaluation and planning

    International Nuclear Information System (INIS)

    Litman, T.A.

    2006-01-01

    Parking facilities are a major cost to society. Current planning practices are based on the assumption that parking should be abundant and provided free, with costs borne indirectly. This report examined parking management strategies related to integrated parking plans. Problems with current parking planning practices were reviewed. The costs of parking facilities were examined, as well as the savings that can accrue from improved management techniques. Strategies included shared parking; remote parking and shuttle services; walking and cycling improvements; improved enforcement and control; and increasing the capacity of existing parking facilities. Parking pricing methods, financial incentives and parking tax reforms were reviewed. Issues concerning user information and marketing were examined. Overflow parking plans were evaluated. Three illustrative examples of parking management programs were outlined, along with details of implementation, planning and evaluation procedures. It was concluded that cost-effective parking management programs can often reduce parking requirements by 20 to 40 per cent compared with conventional planning requirements, in addition to providing economic, social and environmental benefits. 32 refs., 7 tabs., 3 figs

  12. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  13. Construction contractors involvement in disaster management planning

    Directory of Open Access Journals (Sweden)

    Peter Stringfellow

    2014-06-01

    Full Text Available Disasters, both natural and man-made, cause major damage and loss of life. Because of this, governments around the world are looking at building resilience to ensure communities can recover quickly and have minimal impact from a disaster. Part of building resilience is to plan for disaster management and recovery. Literature reveals that construction contractors can play a critical role within this process as they have control of resource supply chains and key knowledge and skills they are well suited to assist in disaster planning. However, as literature also reveals there is currently little involvement of construction contractors in the disaster planning process. This gap between what should be done and what is currently done is investigated. Representatives from industry bodies are interviewed to determine their understanding of the industry’s involvement in disaster planning and what capacity the industry might have to be involved. The interviewee’s responses agree with current literature that there is currently little or no involvement with disaster planning however there is interest in being involved with disaster management planning if there was a forum for this to occur. Based on the responses the researcher has proposed a model to engage construction contractors within state government disaster management planning.

  14. Diagnosing, managing, and preventing cracked tooth syndrome.

    Science.gov (United States)

    Wright, Edward F; Bartoloni, Joseph A

    2012-01-01

    Cracked tooth syndrome (CTS) can be a perplexing disorder to diagnose and manage. Many practitioners wonder whether the latest dental materials and adhesives can or should be used when restoring these teeth. The authors reviewed the literature and developed recommendations for how to diagnose and manage CTS and prevent it in susceptible teeth. As the population continues to age and people retain their teeth longer, it is anticipated that patients will present even more frequently with symptoms of CTS.

  15. National Ignition Facility Configuration Management Plan

    International Nuclear Information System (INIS)

    Cabral, S G; Moore, T L

    2002-01-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  16. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  17. Implementing post-trial access plans for HIV prevention research.

    Science.gov (United States)

    Paul, Amy; Merritt, Maria W; Sugarman, Jeremy

    2018-02-27

    Ethics guidance increasingly recognises that researchers and sponsors have obligations to consider provisions for post-trial access (PTA) to interventions that are found to be beneficial in research. Yet, there is little information regarding whether and how such plans can actually be implemented. Understanding practical experiences of developing and implementing these plans is critical to both optimising their implementation and informing conceptual work related to PTA. This viewpoint is informed by experiences with developing and implementing PTA plans for six large-scale multicentre HIV prevention trials supported by the HIV Prevention Trials Network. These experiences suggest that planning and implementing PTA often involve challenges of planning under uncertainty and confronting practical barriers to accessing healthcare systems. Even in relatively favourable circumstances where a tested intervention medication is approved and available in the local healthcare system, system-level barriers can threaten the viability of PTA plans. The aggregate experience across these HIV prevention trials suggests that simply referring participants to local healthcare systems for PTA will not necessarily result in continued access to beneficial interventions for trial participants. Serious commitments to PTA will require additional efforts to learn from future approaches, measuring the success of PTA plans with dedicated follow-up and further developing normative guidance to help research stakeholders navigate the complex practical challenges of realising PTA. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  18. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  19. 34 CFR Appendix A to Subpart N of... - Sample Default Prevention Plan

    Science.gov (United States)

    2010-07-01

    ... implement when developing a default prevention plan. I. Core Default Reduction Strategies 1. Establish your.... Establish a process to ensure the accuracy of your rate. II. Additional Default Reduction Strategies 1... debt management activities. 2. Enhance the enrollment retention and academic persistence of borrowers...

  20. Coping planning: a patient-centred and strengths-focused approach to suicide prevention training.

    Science.gov (United States)

    Stallman, Helen M

    2018-04-01

    Suicide is a leading cause of premature death and, despite significant investment, the prevalence rate has remained relatively stable for more than a decade. Theoretically, the use of 'safety planning' as a response to suicidality likely maintains suicide as a potential solution for vulnerable people. This paper describes a theoretically-supported paradigm shift from safety planning to 'coping planning' to improve patient outcomes and improve the confidence and competence of clinicians working with people with suicidality. Coping planning is a strategy used to support people with acute distress. Its components of 'caring', 'collaborating' and 'connecting' reinforce existing strengths, promote self-efficacy and link people with more intensive supports, as needed. Coping planning overcomes the limitations of existing approaches. It reframes suicide prevention from managing patients disclosing suicidality to ensuring patients have minimally sufficient temporary support to help them cope. This approach has the potential to promote coping self-efficacy and prevent deterioration that leads to suicide.

  1. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  2. SAGES Guidelines: Prevention and management of gastro ...

    African Journals Online (AJOL)

    SAGES Guidelines: Prevention and management of gastro-oesophageal varices and variceal haemorrhage in cirrhosis. J F Botha. Abstract. No Abstract South African Gastroenterology Review Vol. 6 (1) 2008: pp. 23-25. Full Text: EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT.

  3. Diagnosis, Prevention and Management of Postoperative ...

    African Journals Online (AJOL)

    Diagnosis, Prevention and Management of Postoperative Pulmonary Edema. ... period or it can be negative pressure pulmonary edema (NPPE). NPPE is an important clinical entity in immediate post.extubation period and occurs due to acute upper airway obstruction and creation of acute negative intrathoracic pressure.

  4. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  5. Energy management, planning, and program development

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    The Ohio ERDA is statutorily required to maintain an energy-planning capability and to manage a programmatic effort to bring Ohio energy supply and demand into balance consistent with the state's growth and development needs. The Ohio Energy Information System is the major planning tool and it encompasses the Ohio Energy Data Base, the Energy Short-Term Emergency Evalution Model, and a capability to assess alternative-policy-action impacts. A discussion of the program is presented. (MCW)

  6. PFP Interface identification and management planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required

  7. Livermore Site Spill Prevention, Control, and Countermeasures (SPCC) Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bellah, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mertesdorf, E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-21

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations (40 CFR), Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at the Livermore Site.

  8. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  9. Planning and management for reactor decommissioning

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko

    2001-01-01

    This report describes decommissioning strategy, planning process, regulation, management and organization, radiological characterization and safety. Planning is used to identify, define and organize the requirements for decommissioning including decommissioning options, items to be accomplished (objective, scope), to solve problems of how it is to be accomplished (methods, means and procedures), questions of who will execute it (resources, organization and responsibilities, interfacing), and time when it will be executed (schedule for meeting the objectives). A plan is highly dependent on the quality of the management team assembled to carry it out. Radiological characterization involves a survey of existing data, calculation, in situ measurements and/or sampling and analyses. Using this databases decommissioning planner may assess options, considering: decontamination processes, dismantling procedures, tools required, radiological protection of workers and public/environment, waste classification, and resulting costs. Comparison and optimization of these factors will lead to selection of a decommissioning strategy, i.e. typically, immediate or deferred dismantling. The planning and implementation of decommissioning for nuclear reactors should be referred both recent dismantling techniques and many decommissioning experiences. The technical lessons learned from many projects will help in the planning for future decommissioning projects. And systematic planning and management are essential to successful completion of a decommissioning project. (author)

  10. Form planning Control to growth management

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    -right government decided to transfer national planning functions from the Ministry of the Environment (Miljøministeriet) to the Danish Business Authority (Erhvervsstyrelsen). This was done in the midst of an on-going political debate over ‘simplifying’ the Planning Act to facilitate more economic growth....... In this light, Danish spatial planning continues to align with prevailing neo-liberal minded government agendas and thereby ends up reflecting the ideologies and interests of the government in place. In contrast with the social welfarist objectives of the 1970s, these governmental preferences have indirectly...... caused that spatial planning be regarded more as a cost than an asset. Accordingly, it is evident that the Danish planning domain has progressively lost political clout and the focus is changed towards facilitation and management of economic growth....

  11. BUSINESS PLAN AS A MANAGEMENT TOOL

    Directory of Open Access Journals (Sweden)

    BRAG Ă FILOFTEIA VIORICA

    2013-02-01

    Full Text Available Most business people think of the business plans when they starting a new business or submitting documentation for accessing the funding source. The business plan involves a thinking perspective on the business, beginning from the set objectives, includes all the stages and resources they need to achieve them over a period of time. Therefore, in this article, we emphasize that they are equally useful for the daily management of a business, even if a business needs or not the new investment. Businesses need plans to optimize the growth and the development in accordance with the priorities.

  12. Solid waste management complex site development plan

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-01-01

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated

  13. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  14. Planning and Management - the Most Neglected Activities in ...

    African Journals Online (AJOL)

    Lexicography has a long history of ineffective planning and inefficient management. This article applies the methods of general planning and management to the planning and management of a lexicographic unit. Keywords: Planning, management, mission statement, strategic focus Areas, performance areas, situational ...

  15. Site management plan: Douglas Point Ecological Laboratory

    International Nuclear Information System (INIS)

    Jensen, B.L.; Miles, K.J.; Strass, P.K.; McDonald, B.

    1979-01-01

    A portion of the Douglas Point Site has been set aside for use as an ecological monitoring facility (DPEL). Plans call for it to provide for long-term scientific study and analysis of specific terrestrial and aquatic ecological systems representative of the coastal plain region of the mid-Atlantic United States. Discussion of the program is presented under the following section headings: goals and objectives; management and organization of DPEL; laboratory director; site manager; monitoring manager; research manager; and, organizational chart. The seven appendixes are entitled: detailed site description; supplemental land use plan; contract between Potomac Electric Power Company and Charles County Community Collge (CCCC); research and monitoring projects initiated at the Douglas Point Power Plant site; advisory committees; facilities and equipment; and CCCC personnel resumes

  16. Wildland Fire Management Plan for Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Schwager, K.; Green, T. M.

    2014-01-01

    The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.

  17. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K.; Green, T. M.

    2014-10-01

    The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.

  18. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  19. 2010-2014 Pollution Prevention Program Strategic Plan

    Science.gov (United States)

    This Strategic Plan identifies a number of opportunities for EPA's Pollution Prevention (P2) Program to help reduce: the emission of greenhouse gasses; the use of hazardous materials; and the use of natural resources, while contributing to a greener and more sustainable economy.

  20. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    2002-05-01

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  1. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  2. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  3. A Course in Environmental Planning and Management.

    Science.gov (United States)

    Conacher, Arthur; And Others

    1993-01-01

    Describes a 13-week, third-year course in Environmental Planning and Management consisting of a mixture of lectures, seminars, workshop/laboratory sessions and field-based projects. Student objectives include awareness of the need for and complexities of environmental concerns; critiques of work done by environmental agencies and consultants; and…

  4. Hanford emergency management plan - release 15

    International Nuclear Information System (INIS)

    CARPENTER, G.A.

    1999-01-01

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety

  5. Outcomes Oriented Planning, Management, and Evaluation.

    Science.gov (United States)

    Kinnison, Charles J.

    An outcomes orientation is examined as the dominant focus for formulating improvements in a college's planning, management, and evaluation (PME) system. Outcomes are seen as individual (produced by college personnel or students), program related, or institutional. An outcomes orientation to PME has the advantages of relating to the quality of…

  6. Energy conservation: its planning and management

    International Nuclear Information System (INIS)

    Nanda, K.S.; Patra, K.C.

    1995-01-01

    Energy conservation, its planning and management and the development of renewable energy systems of proven design are very worthy challenges for all. Energy education at various levels is most important particularly in the development of renewable energy technology. 2 refs., 3 tabs

  7. Planning for and managing environmental restoration waste

    International Nuclear Information System (INIS)

    Miller, J.Q.

    1993-01-01

    This paper describes the approach used to support the management of environmental restoration (ER) waste. A general description is provided of the tools and techniques that have been developed and applied to produce waste generation forecast data and treatment, storage, and disposal capacity needs. The ER Program can now consistently manage ER waste streams from initial generation through ultimate disposal. Utilizing the valuable information that results from application of strategically planned systems and techniques demonstrates the ability to provide the necessary waste management support for the ER cleanup process

  8. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  9. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  10. Preventing and managing awareness during general anesthesia

    Directory of Open Access Journals (Sweden)

    Jelena Berger

    2014-03-01

    Full Text Available Background: General anesthesia is a reversible state of a temporary loss of consciousness, analgesia, muscle paralysis, blunted autonomic responses and amnesia. To achieve this, an adequate depth of anesthesia should be maintained throughout the surgery. Awareness is a serious complication of general anesthesia, which occurs when the depth of anesthesia is not appropriate due to various causes.In this paper the underlying neurobiology of intraoperative awareness is presented, as well as risk factors for awareness and methods for assessing the depth of anesthesia. Possible psychological consequences of awareness and their management are also discussed. At the end, the recommendations for preventing intraoperative awareness are given.Conclusions: Awareness during general anesthesia may have adverse psychological sequelae in individual patients, therefore guidelines for preventing and managing of intraoperative awareness need to be adopted. In case of a possible awareness, the recommendations for offering a psychological support should also be followed.

  11. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  12. Hanford Site Pollution Prevention Plan Progress report, 1993

    International Nuclear Information System (INIS)

    1994-08-01

    This report tracks progress against the goals stated in the Hanford Site 5-year Pollution Prevention Plan. The executive summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, executive summary, and the progress reports are elements of a pollution prevention planning program that is required by Washington Administrative Code (WAC) 173-307 for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement Chapter 70.95C, Revised Code of Washington, an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the inprocess reuse or reclamation of valuable spent material. Although the Hanford Site is exempt, it is voluntarily complying with this state regulatory-mandated program. This is the first year the Hanford Site is submitting a progress report. It covers calendar year 1993 plus the last quarter of 1992. What is reported, in accordance with WAC 173-307, are reductions in hazardous substance use and hazardous waste generated. A system of Process Waste Assessments (PWA) was chosen to meet the requirements of the program. The PWAs were organized by a physical facility or company organization. Each waste-generating facility/organization performed PWAs to identify, screen, and analyze their own reduction options. Each completed PWA identified any number of reduction opportunities, that are listed individually in the plan and summarized by category in the executive summary. These opportunities were to be implemented or evaluated further over the duration of the 5-year plan. The basis of this progress report is to track action taken on these PWA reduction opportunities in relationship to achieving the goals stated in the Pollution Prevention Plan

  13. Hanford Site Pollution Prevention Plan Progress report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report tracks progress against the goals stated in the Hanford Site 5-year Pollution Prevention Plan. The executive summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, executive summary, and the progress reports are elements of a pollution prevention planning program that is required by Washington Administrative Code (WAC) 173-307 for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement Chapter 70.95C, Revised Code of Washington, an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the inprocess reuse or reclamation of valuable spent material. Although the Hanford Site is exempt, it is voluntarily complying with this state regulatory-mandated program. This is the first year the Hanford Site is submitting a progress report. It covers calendar year 1993 plus the last quarter of 1992. What is reported, in accordance with WAC 173-307, are reductions in hazardous substance use and hazardous waste generated. A system of Process Waste Assessments (PWA) was chosen to meet the requirements of the program. The PWAs were organized by a physical facility or company organization. Each waste-generating facility/organization performed PWAs to identify, screen, and analyze their own reduction options. Each completed PWA identified any number of reduction opportunities, that are listed individually in the plan and summarized by category in the executive summary. These opportunities were to be implemented or evaluated further over the duration of the 5-year plan. The basis of this progress report is to track action taken on these PWA reduction opportunities in relationship to achieving the goals stated in the Pollution Prevention Plan.

  14. NIF Operations Management Plan, August 2011

    Energy Technology Data Exchange (ETDEWEB)

    Van Wonterghem, Bruno M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States). National Ignition Facility (NIF)

    2014-01-30

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the

  15. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  16. Strategic planning manager and management education in elementary education institutions

    Directory of Open Access Journals (Sweden)

    Kleeder José Bracho Pérez

    2013-10-01

    Full Text Available The purpose of this study was to determine the relationship between strategic planning and management of educational managers in primary schools of the parish municipality of Ricaurte Mara. The research was based on the theoretical bases of authors: Serna (2003, Chiavenato (2001, and Weihrich Koantz (2004, Pacheco, chestnut and Caicedo (2002 among others. The research was descriptive correlational design under a nonexperimental transactional field, the population consisted of 115 subjects between administrators and teachers, which the sample was taken and Tamayo Tamayo criterion; census. Data collection was conducted through two questionnaires (Brad for managers and (Brad for teachers each consisting of 42 items in Likert-type scale with four answer choices, which was validated by five experts and the reliability was calculated through Cronbach alpha coefficient was the result of which (0.95 for the questionnaire (Brad applied to directors and (0.90 for the questionnaire (Brad applied to teachers. The statistic used was descriptive using percentage tables. The results determined that the application of strategic planning by educational managers is low so there are weaknesses in management, we can say that there is a very high correlation (r = 0.89 between strategic planning and management of the educational manager in primary schools of the parish municipality of Ricaurte Mara. 

  17. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  18. A resource-efficient planning for pressure ulcer prevention.

    Science.gov (United States)

    Ostadabbas, Sarah; Yousefi, Rasoul; Nourani, Mehrdad; Faezipour, Miad; Tamil, Lakshman; Pompeo, Matthew Q

    2012-11-01

    Pressure ulcer is a critical problem for bed-ridden and wheelchair-bound patients, diabetics, and the elderly. Patients need to be regularly repositioned to prevent excessive pressure on a single area of body, which can lead to ulcers. Pressure ulcers are extremely costly to treat and may lead to several other health problems, including death. The current standard for prevention is to reposition at-risk patients every two hours. Even if it is done properly, a fixed schedule is not sufficient to prevent all ulcers. Moreover, it may result in nurses being overworked by turning some patients too frequently. In this paper, we present an algorithm for finding a nurse-effort optimal repositioning schedule that prevents pressure ulcer formation for a finite planning horizon. Our proposed algorithm uses data from a commercial pressure mat assembled on the beds surface and provides a sequence of next positions and the time of repositioning for each patient.

  19. Household waste compositional analysis variation from insular communities in the framework of waste prevention strategy plans.

    Science.gov (United States)

    Zorpas, Antonis A; Lasaridi, Katia; Voukkali, Irene; Loizia, Pantelitsa; Chroni, Christina

    2015-04-01

    Waste management planning requires reliable data regarding waste generation, affecting factors on waste generation and forecasts of waste quantities based on facts. In order to decrease the environmental impacts of waste management the choice of prevention plan as well as the treatment method must be based on the features of the waste that are produced in a specific area. Factors such as culture, economic development, climate, and energy sources have an impact on waste composition; composition influences the need of collecting waste more or less frequently of waste collection and disposition. The research question was to discover the main barriers concerning the compositional analysis in Insular Communities under warm climate conditions and the findings from this study enabled the main contents of a waste management plan to be established. These included advice to residents on waste minimisation, liaison with stakeholders and the expansion of kerbside recycling schemes. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ``Plans,`` for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ``Waste Reduction,`` an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD.

  1. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ''Plans,'' for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ''Waste Reduction,'' an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD

  2. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  3. Chemical Spill Prevention, Control, and Countermeasures Plan: 100 Areas

    International Nuclear Information System (INIS)

    Chien, Y.M.

    1989-06-01

    The purpose of this Chemical Spill Prevention, Control, and Countermeasures (SPCC) Plan is to identify the chemical spill control practices, procedures, and containment devices Westinghouse Hanford Company (Westinghouse Hanford) employs to prevent a reportable quantity (RQ) of a hazardous substance (as defined in 40 CFR Part 302) from being released to the environment. The chemical systems and chemical storage facilities in the 100 Areas are described. This document traces the ultimate fate of accidental chemical spills at the 100 Areas. Also included in the document destinations, spill containment devices, and systems surveillance frequencies. 2 tabs

  4. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  5. Strategic plan for Hanford site information management

    International Nuclear Information System (INIS)

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site's decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE

  6. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  7. Action Plan to Improve Customer Relationship Management

    OpenAIRE

    Laine, Antti

    2014-01-01

    This thesis concentrates on improving product recognisability and most critical Customer Relationship Management issues in the case company. The case company seeks to clarify the product recognizability and the customers’ knowledge of their product range in its whole diagnostic sector, and wanted to develop an action plan to improve them. To suggest improvements in these areas, this thesis investigates the current state of the product knowledge, and the customers’ opinions as for how ...

  8. Environmental development plan. LWR commercial waste management

    International Nuclear Information System (INIS)

    1980-08-01

    This Environmental Development Plan (EDP) identifies the planning and managerial requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Commercial Waste Management Program (CWM). Environment is defined in its broadest sense to include environmental, health (occupational and public), safety, socioeconomic, legal and institutional aspects. This plan addresses certain present and potential Federal responsibilities for the storage, treatment, transfer and disposal of radioactive waste materials produced by the nuclear power industry. The handling and disposal of LWR spent fuel and processed high-level waste (in the event reprocessing occurs) are included in this plan. Defense waste management activities, which are addressed in detail in a separate EDP, are considered only to the extent that such activities are common to the commercial waste management program. This EDP addresses three principal elements associated with the disposal of radioactive waste materials from the commercial nuclear power industry, namely Terminal Isolation Research and Development, Spent Fuel Storage and Waste Treatment Technology. The major specific concerns and requirements addressed are assurance that (1) radioactivity will be contained during waste transport, interim storage or while the waste is considered as retrievable from a repository facility, (2) the interim storage facilities will adequately isolate the radioactive material from the biosphere, (3) the terminal isolation facility will isolate the wastes from the biosphere over a time period allowing the radioactivity to decay to innocuous levels, (4) the terminal isolation mode for the waste will abbreviate the need for surveillance and institutional control by future generations, and (5) the public will accept the basic waste management strategy and geographical sites when needed

  9. ATTENDING: Critiquing a Physician's Management Plan.

    Science.gov (United States)

    Miller, P L

    1983-05-01

    The ATTENDING system is designed to critique a physician's preoperative plan for anesthetic management. In undertaking to critique a physician's plan, ATTENDING differs from other medical decision making systems, which in effect attempt to tell a physician what to do. ATTENDING's approach may prove more acceptable clinically, and may avoid certain social, medical, and medicolegal drawbacks. To cri-tique a physician's plan, ATTENDING must confront three basic problems. 1) It must be able to explore flexibly all possible approaches for a patient's management. The formalism of an ``augmented decision network'' allows this. 2) It must be able to assess the relative risks and benefits of alternative approaches intelligently. A heuristic approach to risk analysis is outlined, based on three basic principles which are de-scribed in detail. 3) It must produce a potentially complex analysis which critiques the plan in focused, readable prose. This is facilitated by PROSENET, an approach which allows clean separation between the organization of the content of an analysis and its expression in English prose.

  10. River Protection Project (RPP) Project Management Plan

    International Nuclear Information System (INIS)

    NAVARRO, J.E.

    2001-01-01

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation

  11. Household waste compositional analysis variation from insular communities in the framework of waste prevention strategy plans

    Energy Technology Data Exchange (ETDEWEB)

    Zorpas, Antonis A., E-mail: antonis.zorpas@ouc.ac.cy [Cyprus Open University, Faculty of Pure and Applied Science, Environmental Conservation and Management, P.O. Box 12794, 2252 Latsia, Nicosia (Cyprus); Lasaridi, Katia, E-mail: klasaridi@hua.gr [Harokopio University, Department of Geography, 70 El. Venizelou, 176 71 Athens, Kallithea (Greece); Voukkali, Irene [Institute of Environmental Technology and Sustainable Development, ENVITECH LTD, Department of Research and Development, P.O. Box 34073, 5309 (Cyprus); Loizia, Pantelitsa, E-mail: irenevoukkali@envitech.org [Institute of Environmental Technology and Sustainable Development, ENVITECH LTD, Department of Research and Development, P.O. Box 34073, 5309 (Cyprus); Chroni, Christina [Harokopio University, Department of Geography, 70 El. Venizelou, 176 71 Athens, Kallithea (Greece)

    2015-04-15

    Highlights: • Waste framework directive has set clear waste prevention procedures. • Household Compositional analysis. • Waste management plans. • Zero waste approach. • Waste generation. - Abstract: Waste management planning requires reliable data regarding waste generation, affecting factors on waste generation and forecasts of waste quantities based on facts. In order to decrease the environmental impacts of waste management the choice of prevention plan as well as the treatment method must be based on the features of the waste that are produced in a specific area. Factors such as culture, economic development, climate, and energy sources have an impact on waste composition; composition influences the need of collecting waste more or less frequently of waste collection and disposition. The research question was to discover the main barriers concerning the compositional analysis in Insular Communities under warm climate conditions and the findings from this study enabled the main contents of a waste management plan to be established. These included advice to residents on waste minimisation, liaison with stakeholders and the expansion of kerbside recycling schemes.

  12. Household waste compositional analysis variation from insular communities in the framework of waste prevention strategy plans

    International Nuclear Information System (INIS)

    Zorpas, Antonis A.; Lasaridi, Katia; Voukkali, Irene; Loizia, Pantelitsa; Chroni, Christina

    2015-01-01

    Highlights: • Waste framework directive has set clear waste prevention procedures. • Household Compositional analysis. • Waste management plans. • Zero waste approach. • Waste generation. - Abstract: Waste management planning requires reliable data regarding waste generation, affecting factors on waste generation and forecasts of waste quantities based on facts. In order to decrease the environmental impacts of waste management the choice of prevention plan as well as the treatment method must be based on the features of the waste that are produced in a specific area. Factors such as culture, economic development, climate, and energy sources have an impact on waste composition; composition influences the need of collecting waste more or less frequently of waste collection and disposition. The research question was to discover the main barriers concerning the compositional analysis in Insular Communities under warm climate conditions and the findings from this study enabled the main contents of a waste management plan to be established. These included advice to residents on waste minimisation, liaison with stakeholders and the expansion of kerbside recycling schemes

  13. Data management plans: the missing perspective.

    Science.gov (United States)

    Williams, Mary; Bagwell, Jacqueline; Nahm Zozus, Meredith

    2017-07-01

    The National Institutes of Health requires data sharing plans for projects with over five hundred thousand dollars in direct costs in a single year and has recently released a new guidance on rigor and reproducibility in grant applications. The National Science Foundation outright requires Data Management Plans (DMPs) as part of applications for funding. However, there is no general and definitive list of topics that should be covered in a DMP for a research project. We identified and reviewed DMP requirements from research funders. Forty-three DMP topics were identified. The review uncovered inconsistent requirements for written DMPs as well as high variability in required or suggested DMP topics among funder requirements. DMP requirements were found to emphasize post-publication data sharing rather than upstream activities that impact data quality, provide traceability or support reproducibility. With the emphasis equalized, the forty-three identified topics can aid Data Managers in systematically generating comprehensive DMPs that support research project planning and funding application evaluation as well as data management conduct and post-publication data sharing. Copyright © 2017. Published by Elsevier Inc.

  14. Management strategies in hospitals: scenario planning.

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  15. Management strategies in hospitals: scenario planning

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management. PMID:26504735

  16. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  17. Prospective study establishing a management plan for impacted third molar in patients undergoing hematopoietic stem cell transplantation

    OpenAIRE

    Yamagata, Kenji; Onizawa, Kojiro; Yanagawa, Toru; Takeuchi, Yasutoshi; Hasegawa, Yuichi; Chiba, Shigeru; Bukawa, Hiroki

    2011-01-01

    ObjectiveAlthough dental treatment before hematopoietic stem cell transplantation (HSCT) is essential to prevent serious infections from oral sources, the best management plan for impacted third molar (ITM) is unclear.Study designThis study was planned to establish a management plan for ITM. Eighty-four candidates for HSCT therapy were consecutively enrolled in the prospective trial. The management plan, which was evidence based and prospectively decided, was to extract the symptomatic ITMs a...

  18. Role of strategic planning in engineering management

    Science.gov (United States)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  19. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  20. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  1. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  2. NYC CV Pilot Deployment : Safety Management Plan : New York City.

    Science.gov (United States)

    2016-04-22

    This safety management plan identifies preliminary safety hazards associated with the New York City Connected Vehicle Pilot Deployment project. Each of the hazards is rated, and a plan for managing the risks through detailed design and deployment is ...

  3. National Ignition Facility Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, V.

    1997-09-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1{degree}C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  4. National Ignition Facility Site Management Plan

    International Nuclear Information System (INIS)

    Roberts, V.

    1997-01-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1 degree C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  5. Integrated Resource Planning for Urban Waste Management

    Directory of Open Access Journals (Sweden)

    Damien Giurco

    2015-01-01

    Full Text Available The waste hierarchy currently dominates waste management planning in Australia. It is effective in helping planners consider options from waste avoidance or “reduction” through to providing infrastructure for landfill or other “disposal”. However, it is inadequate for guiding context-specific decisions regarding sustainable waste management and resource recovery, including the ability for stakeholders to compare a range of options on an equal footing whilst considering their various sustainability impacts and trade-offs. This paper outlines the potential use of Integrated Resource Planning (IRP as a decision-making approach for the urban waste sector, illustrated using an Australian case study. IRP is well established in both the water and energy sectors in Australia and internationally. It has been used in long-term planning enabling decision-makers to consider the potential to reduce resource use through efficiency alongside options for new infrastructure. Its use in the waste sector could address a number of the current limitations experienced by providing a broader context-sensitive, adaptive, and stakeholder focused approach to planning not present in the waste hierarchy and commonly used cost benefit analysis. For both efficiency and new infrastructure options IRP could be useful in assisting governments to make decisions that are consistent with agreed objectives while addressing costs of alternative options and uncertainty regarding their environmental and social impacts. This paper highlights various international waste planning approaches, differences between the sectors where IRP has been used and gives a worked example of how IRP could be applied in the Australian urban waste sector.

  6. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  7. Prevention and Management of Childhood Obesity.

    Science.gov (United States)

    Dabas, Aashima; Seth, Anju

    2018-02-19

    Childhood obesity has been recognized as a global pandemic. Preventive strategies have proven to be the most effective public health intervention in curbing this pandemic. A multi-component approach involving dietary modification and advocacy for a healthy lifestyle comprising of regular physical activity, minimizing screen time and behavioral interventions have been found beneficial in preventing obesity. A life-cycle approach has been recommended where preventive interventions go as far back as affecting maternal, fetal and early childhood nutrition and lifestyle. Family, school and community involvement is important for long term results, so is the involvement of government in developing policies that help create an environment and opportunities for healthy diet and physical activity. Management of childhood obesity is challenging. It involves following a structured weight reduction programme individualized for every child, along with adoption of a healthy diet and life style. Anti-obesity drugs have a limited role in childhood years and are not recommended in younger children. Bariatric surgery is reserved for morbidly obese older adolescents but its long term safety data is limited in this age group.

  8. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  9. 40 CFR 60.55c - Waste management plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Waste management plan. 60.55c Section... Waste Incinerators for Which Construction is Commenced After June 20, 1996 § 60.55c Waste management plan. The owner or operator of an affected facility shall prepare a waste management plan. The waste...

  10. 33 CFR 151.57 - Waste management plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Waste management plans. 151.57... Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.57 Waste management... follows the plan. (c) Each waste management plan under paragraph (b) of this section must be in writing...

  11. Adaptive Management Planning Projects as Conflict Resolution Processes

    OpenAIRE

    Greg Walkerden

    2006-01-01

    Adaptive management planning projects use multiparty, multidisciplinary workshops and simulation modeling to facilitate dialogue, negotiation, and planning. However, they have been criticized as a poor medium for conflict resolution. Alternative processes from the conflict resolution tradition, e.g., principled negotiation and sequenced negotiation, address uncertainty and biophysical constraints much less skillfully than does adaptive management. When we evaluate adaptive management planning...

  12. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  13. Terrestrial forest management plan for Palmyra Atoll

    Science.gov (United States)

    Hathaway, Stacie A.; McEachern, Kathryn; Fisher, Robert N.

    2011-01-01

    This 'Terrestrial Forest Management Plan for Palmyra Atoll' was developed by the U.S. Geological Survey (USGS) for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. It is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The 'Terrestrial Forest Management Plan for Palmyra Atoll' focuses on ecosystem integrity and specifically identifies and addresses issues related to assessing the status and distribution of resources, as well as the pressures acting upon them, most specifically nonnative and potentially invasive species. The plan, which presents strategies for increasing ecosystem integrity, provides a framework to implement and track the progress of conservation and restoration goals related to terrestrial resources on Palmyra Atoll. The report in its present form is intended to be an overview of what is known about historical and current forest resources; it is not an exhaustive review of all available literature relevant to forest management but an attempt to assemble as much information specific to Palmyra Atoll as possible. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. The terrestrial ecosystem consists of three primary native vegetation types: Pisonia grandis forest, coastal strand forest, and grassland. Among these vegetation types, the health and extent of Pisonia grandis forest is of particular concern. Overall, the three vegetation types support 25 native plant species (two of which may be extirpated), 14 species of sea birds, six shore birds, at least one native reptile, at least seven native insects, and six native land crabs. Green and hawksbill turtles forage at Palmyra Atoll

  14. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans) are...

  15. The prevention and management of pressure ulcers.

    Science.gov (United States)

    Goode, P S; Allman, R M

    1989-11-01

    Pressure ulcers are a common problem for older persons. Complications associated with pressure ulcers include infection and even death for some patients. Pressure is the primary pathogenic factor, but shearing forces, friction, and moisture are also important. Immobility, nutritional status, and age-related factors seem to be significant risk factors. Preventive care includes use of assessment tools to identify high risk patients, frequent repositioning, air or foam mattresses that reduce pressure over bony prominences, as well as careful attention to optimizing the overall patient condition. When pressure ulcers do develop, the treatment plan should include adequate nutrition including protein, vitamin C, and zinc supplements as indicated; systemic antibiotics for sepsis, cellulitis, osteomyelitis, or the prevention of bacterial endocarditis; and local wound care that eliminates necrotic tissue, decreases bacterial load, and provides a physiologic, pressure-free environment allowing the wound to heal. Specialized beds may be considered in some patients, particularly those with larger ulcers. Surgery is an option in older persons who are operative candidates. For some patients with pressure ulcers, appropriate treatment goals may focus on providing comfort rather than curing the ulcer.

  16. Report on the behalf of the Finance, General Economy and Budgetary Control Commission on the Finance bill for 2011 (n. 2824), appendix N. 13: ecology, sustainable development and land planning, hazard prevention, management and steering of ecology, energy, sustainable development, land planning and sea policies; Rapport fait au nom de la Commission des Finances, de L'economie Generale et du Controle Budgetaire sur le projet de loi de finances pour 2011 (n. 2824), annexe N. 13 ecologie, developpement et amenagement durables prevention des risques conduite et pilotage des politiques de l'ecologie, de l'energie, du developpement durable et de la mer

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This report comments the grants awarded to two programmes, the first one concerning the prevention of hazards, and the second concerning the management and steering of ecology, energy, sustainable development, land planning and sea policies. These two programmes are emblematic of the French government's action and ambition in the field of sustainable development and ecology. For the first one, the report comments the evolution of grants, their objectives and performance indicators. Then it addresses its various aspects: prevention of technological hazards and pollutions, prevention of natural and hydraulic hazards, nuclear safety, after-mine management. For the second programme, the report gives an assessment of the ministry reorganization, and comments the means requested for 2011

  17. Prevention, Recognition, and Management of Urologic Injuries During Gynecologic Surgery.

    Science.gov (United States)

    Sharp, Howard T; Adelman, Marisa R

    2016-06-01

    The urethra, bladder, and ureters are particularly susceptible to injury during gynecologic surgery. When preventive measures fail, prompt recognition and management of injury can avoid long-term sequelae such as fistula formation and loss of renal function. Intraoperative identification should be the primary goal when an injury occurs, although this is not always possible. Postoperative injury recognition requires a high level of suspicion and vigilance. In addition to history and physical examination, appropriate radiologic studies can be useful in localizing injury and planning management strategies. Some injuries may require Foley catheter drainage or ureteral stenting alone, whereas others will require operative intervention with ureteral resection and reanastomosis or reimplantation. Prompt restoration of urinary drainage or diversion will avoid further renal compromise.

  18. Strategic and tactiocal planning for managing national park resources

    Science.gov (United States)

    Daniel L. Schmoldt; David L. Peterson

    2001-01-01

    Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...

  19. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...... assessment (SEA). An important environmental factor for the water sector is climate change, especially the changes it causes to the water environment. However, based on an argument of an inadequate knowledge base regarding climate change impacts, the prospect of Danish authorities including climate change...

  20. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  1. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    Downey, H. D.

    1999-01-01

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  2. Primary prevention of periodontitis: managing gingivitis.

    Science.gov (United States)

    Chapple, Iain L C; Van der Weijden, Fridus; Doerfer, Christof; Herrera, David; Shapira, Lior; Polak, David; Madianos, Phoebus; Louropoulou, Anna; Machtei, Eli; Donos, Nikos; Greenwell, Henry; Van Winkelhoff, Ari J; Eren Kuru, Bahar; Arweiler, Nicole; Teughels, Wim; Aimetti, Mario; Molina, Ana; Montero, Eduardo; Graziani, Filippo

    2015-04-01

    Periodontitis is a ubiquitous and irreversible inflammatory condition and represents a significant public health burden. Severe periodontitis affects over 11% of adults, is a major cause of tooth loss impacting negatively upon speech, nutrition, quality of life and self-esteem, and has systemic inflammatory consequences. Periodontitis is preventable and treatment leads to reduced rates of tooth loss and improved quality of life. However, successful treatment necessitates behaviour change in patients to address lifestyle risk factors (e.g. smoking) and, most importantly, to attain and sustain high standards of daily plaque removal, lifelong. While mechanical plaque removal remains the bedrock of successful periodontal disease management, in high-risk patients it appears that the critical threshold for plaque accumulation to trigger periodontitis is low, and such patients may benefit from adjunctive agents for primary prevention of periodontitis. The aims of this working group were to systematically review the evidence for primary prevention of periodontitis by preventing gingivitis via four approaches: 1) the efficacy of mechanical self-administered plaque control regimes; 2) the efficacy of self-administered inter-dental mechanical plaque control; 3) the efficacy of adjunctive chemical plaque control; and 4) anti-inflammatory (sole or adjunctive) approaches. Two meta-reviews (mechanical plaque removal) and two traditional systematic reviews (chemical plaque control/anti-inflammatory agents) formed the basis of this consensus. Data support the belief that professionally administered plaque control significantly improves gingival inflammation and lowers plaque scores, with some evidence that reinforcement of oral hygiene provides further benefit. Re-chargeable power toothbrushes provide small but statistically significant additional reductions in gingival inflammation and plaque levels. Flossing cannot be recommended other than for sites of gingival and periodontal

  3. A Quantitative Index to Support Recurrence Prevention Plans of Human-Related Events

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yochan; Park, Jinkyun; Jung, Wondea [KAERI, Daejeon (Korea, Republic of); Kim, Do Sam; Lee, Durk Hun [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2015-05-15

    In Korea, HuRAM+ (Human related event Root cause Analysis Method plus) was developed to scrutinize the causes of the human-related events. The information of the human-related events investigated by the HuRAM+ method has been also managed by a database management system, R-tracer. It is obvious that accumulating data of human error causes aims to support plans that reduce recurrences of similar events. However, in spite of the efforts for the development of the human error database, it was indicated that the database does not provide useful empirical basis for establishment of the recurrence prevention plans, because the framework to interpret the collected data and apply the insights from the data into the prevention plants has not been developed yet. In this paper, in order to support establishment of the recurrence prevention plans, a quantitative index, Human Error Repeat Interval (HERI), was proposed and its applications to human error prevention were introduced. In this paper, a quantitative index, the HERI was proposed and the statistics of HERIs were introduced. These estimations can be employed to evaluate effects of recurrence prevention plans to human errors. If a mean HERI score is low and the linear trend is not positive, it can be suspected that the recurrence prevention plans applied every human-related event has not been effectively propagated. For reducing repetitive error causes, the system design or operational culture can be reviewed. If there is a strong and negative trend, systematic investigation of the root causes behind these trends is required. Likewise, we expect that the HERI index will provide significant basis for establishing or adjusting prevention plans of human errors. The accurate estimation and application of HERI scores is expected to be done after accumulating more data. When a scatter plot of HERIs is fitted by two or more models, a statistical model selection method can be employed. Some criteria have been introduced by

  4. A Quantitative Index to Support Recurrence Prevention Plans of Human-Related Events

    International Nuclear Information System (INIS)

    Kim, Yochan; Park, Jinkyun; Jung, Wondea; Kim, Do Sam; Lee, Durk Hun

    2015-01-01

    In Korea, HuRAM+ (Human related event Root cause Analysis Method plus) was developed to scrutinize the causes of the human-related events. The information of the human-related events investigated by the HuRAM+ method has been also managed by a database management system, R-tracer. It is obvious that accumulating data of human error causes aims to support plans that reduce recurrences of similar events. However, in spite of the efforts for the development of the human error database, it was indicated that the database does not provide useful empirical basis for establishment of the recurrence prevention plans, because the framework to interpret the collected data and apply the insights from the data into the prevention plants has not been developed yet. In this paper, in order to support establishment of the recurrence prevention plans, a quantitative index, Human Error Repeat Interval (HERI), was proposed and its applications to human error prevention were introduced. In this paper, a quantitative index, the HERI was proposed and the statistics of HERIs were introduced. These estimations can be employed to evaluate effects of recurrence prevention plans to human errors. If a mean HERI score is low and the linear trend is not positive, it can be suspected that the recurrence prevention plans applied every human-related event has not been effectively propagated. For reducing repetitive error causes, the system design or operational culture can be reviewed. If there is a strong and negative trend, systematic investigation of the root causes behind these trends is required. Likewise, we expect that the HERI index will provide significant basis for establishing or adjusting prevention plans of human errors. The accurate estimation and application of HERI scores is expected to be done after accumulating more data. When a scatter plot of HERIs is fitted by two or more models, a statistical model selection method can be employed. Some criteria have been introduced by

  5. Planning against crime: preventing crime with people not barriers

    CSIR Research Space (South Africa)

    Landman, K

    2005-03-01

    Full Text Available committees to work closely with the police, and in some instances involving local employees (such as domestic workers) to act as the ‘eyes on the street’ and report suspicious behaviour.7 The question that arises is, therefore, how to plan against crime... AND LIEBERMANN six policing areas in the Northern Cape and is also being used in KwaZulu-Natal as part of a broader local crime prevention strategy. So far, the evidence suggests that the model has significant potential to enhance local safety. The model...

  6. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to: (i...

  7. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Science.gov (United States)

    2010-04-01

    ... Secretary will be applied, with a definite plan of silvicultural management, analysis of the short term and... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and...

  8. Economics of vector-borne diseases prevention: The case of the Tiger Mosquito control and Chikungunya and Dengue prevention plan in the Emilia-Romagna region (Northern Italy)

    OpenAIRE

    Rivas Morales, Stefano

    2016-01-01

    Aedes albopictus is considered one of the most invasive mosquito species in the world. It has proved capacity for local transmission of Chikungunya and Dengue within Europe. This research evaluated public costs related to the implementation of the plan for Ae. albopictus control and Chikungunya and Dengue prevention set up in Emilia-Romagna region (Northern Italy), where a Chikungunya epidemic outbreak occurred in 2007, with 217 confirmed cases. The management plan started in 2008 by involvin...

  9. Ciguatera Fish Poisoning: Treatment, Prevention and Management

    Directory of Open Access Journals (Sweden)

    Andrew Reich

    2008-08-01

    Full Text Available Ciguatera Fish Poisoning (CFP is the most frequently reported seafood-toxin illness in the world, and it causes substantial physical and functional impact. It produces a myriad of gastrointestinal, neurologic and/or cardiovascular symptoms which last days to weeks, or even months. Although there are reports of symptom amelioration with some interventions (e.g. IV mannitol, the appropriate treatment for CFP remains unclear to many physicians. We review the literature on the treatments for CFP, including randomized controlled studies and anecdotal reports. The article is intended to clarify treatment options, and provide information about management and prevention of CFP, for emergency room physicians, poison control information providers, other health care providers, and patients.

  10. Ciguatera Fish Poisoning: Treatment, Prevention and Management

    Science.gov (United States)

    Friedman, Melissa A.; Fleming, Lora E.; Fernandez, Mercedes; Bienfang, Paul; Schrank, Kathleen; Dickey, Robert; Bottein, Marie-Yasmine; Backer, Lorraine; Ayyar, Ram; Weisman, Richard; Watkins, Sharon; Granade, Ray; Reich, Andrew

    2008-01-01

    Ciguatera Fish Poisoning (CFP) is the most frequently reported seafood-toxin illness in the world, and it causes substantial physical and functional impact. It produces a myriad of gastrointestinal, neurologic and/or cardiovascular symptoms which last days to weeks, or even months. Although there are reports of symptom amelioration with some interventions (e.g. IV mannitol), the appropriate treatment for CFP remains unclear to many physicians. We review the literature on the treatments for CFP, including randomized controlled studies and anecdotal reports. The article is intended to clarify treatment options, and provide information about management and prevention of CFP, for emergency room physicians, poison control information providers, other health care providers, and patients. PMID:19005579

  11. How to Manage and Plan Terminology: Creating Management TDBs

    Directory of Open Access Journals (Sweden)

    Gordana Jakić

    2016-09-01

    Full Text Available Scientific and technical terminology represents a very topical issue in economically and technologically dependent countries with small languages such as Serbian. The current terminological problems in the Serbian language, especially in specialized areas that are experiencing dynamic development, are: Anglicization of the language for special purposes, underdeveloped and unstable terminology, and lack of adequate and modern terminological and lexical resources. On the one hand, the terminological problems listed above are of concern to subject-field specialists, since inadequate and non-existent terminology significantly affects the representation, transfer and management of specialized knowledge and information. On the other hand, terminology and language planners point to the growing need for immediate and systematic intervention aimed at terminology harmonization, consolidation and standardization. In spite of the awareness, there is no systematic approach to the solving of terminological problems in Serbian. In addition, practical activities regarding the collection and organization of terminology are few and reduced to individual initiatives. Under the paradigm of language planning (LP-oriented terminology management (2, this paper is going to address a practical activity of terminology management: the creation of a Serbian management terminology database (TDB with equivalent terms in English. The paper will discuss the methodology of terminology work, potential obstacles in termbase creation, as well as potential benefits that such a resource would have on all its potential users: management specialists and practitioners, professional translators, and language and terminology planners. A particular focus will be placed on the potential significance that this kind of a database would have for terminology policy and planning in the Serbian language, on the one hand, and knowledge transfer and management, on the other hand.

  12. [Prediction, prevention and management of shoulder dystocia].

    Science.gov (United States)

    Csorba, Roland

    2012-05-20

    Shoulder dystocia is one of the most tragic, fatal and unexpected obstetrical events, which is mostly unpredictable and unpreventable. This clinical picture is defined as a delivery that requires additional obstetric maneuvers to release the shoulders after gentle downward traction has failed. Shoulder dystocia occurs when the fetal shoulder impacts on the maternal symphysis or sacral promontory. The incidence of shoulder dystocia is 0.2-0.6%. High perinatal mortality and morbidity is associated with the condition, even when it is managed appropriately. Obstetricians should be aware of the existing risk factors, but should always be alert to the possibility of shoulder dystocia in all labors. Maternal morbidity is also increased, particularly postpartum hemorrhage, rupture of the uterus, injury of the bladder, urethra and the bowels and fourth-degree perineal tears. Complications of the newborn include asphyxia, perinatal mortality, fracture of the clavicula and the humerus. Brachial plexus injuries are one of the most important fetal complications of shoulder dystocia, complicating 4-16% of such deliveries. The purpose of this article is to review the current evidence regarding the possible prediction, prevention and management of shoulder dystocia.

  13. Tenneessee Valley Authority office of nuclear power management development plan

    International Nuclear Information System (INIS)

    Clements, L.L.

    1985-01-01

    The Tennessee Valley Authority's Management Development Plan is discussed and consists of an analysis of each managerial position, an analysis of each individual manager's and potential manager's qualifications and training and a comparison of the two. From this comparison two products are derived: a management replacement plan and an individual development plan for each nuclear employee. The process of the program is described in detail

  14. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  15. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  16. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  17. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  18. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  19. Fresno/Clovis water management plan

    International Nuclear Information System (INIS)

    Burmeister, W.E.; Peterson, D.

    1993-01-01

    The Fresno/Clovis Metropolitan Area (FCMA) has historically relied solely on untreated undisinfected groundwater as a source of potable water to serve its 500,000 people. Contamination was discovered in some wells in the late 1970s, and cones of depression in areas of heavy pumping have caused contaminants to spread within the basin. Recent data indicate that at least 44 of the 352 public water agency wells in the FCMA have already been deactivated because of groundwater quality degradation. Major plumes of groundwater contamination occur throughout the study area. Most of the agricultural contaminants in the FCMA groundwater are the consequence of routine pesticide application over thousands of acres of surrounding farmland. Commercial and industrial contaminants are primarily due to poor storage and handling practices, careless or improper disposal, and leaking underground tanks. Recent and anticipated water quality regulations will probably require some form of wellhead treatment at every public water agency well in the FCMA. Such treatment may consist of disinfection, corrosion control, and the removal of radionuclides and organic chemicals. Many of the well sites are not sized, located, or configured to accommodate wellhead treatment. Potable water distribution systems in the FCMA were constructed based on dispersed wells and a local distribution network of relatively small water mains. A technical advisory committee (TAC) was formed in 1984 to promote a cooperative water planning effort. The TAC is composed of the five major water agencies in the metropolitan area: the Cities of Fresno and Clovis, Fresno County, the Fresno Metropolitan Flood Control District (FMFCD), and the Fresno Irrigation District (FID). The TAC prepared the work plan and, in August of 1991, selected CH2M HILL to develop the Fresno/Clovis Water Resources Management Plan

  20. 77 FR 38267 - Information Collection; Request for Comment; Objections to New Land Management Plans, Plan...

    Science.gov (United States)

    2012-06-27

    ... DEPARTMENT OF AGRICULTURE Forest Service Information Collection; Request for Comment; Objections to New Land Management Plans, Plan Amendments, and Plan Revisions AGENCY: Forest Service, USDA..., Ecosystem Management Coordination, at 202-205-0895 or email to: [email protected] . Individuals who use...

  1. The flood risk management plan: towards spatial water governance

    NARCIS (Netherlands)

    Hartmann, T.; Driessen, P.

    2017-01-01

    The flood risk management plan challenges both water engineers and spatial planners. It calls for a new mode of governance for flood risk management. This contribution analyses how this mode of governance distinguishes from prevalent approaches. Spatial planning and water management in Europe are

  2. Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan

    Science.gov (United States)

    2017-10-17

    This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...

  3. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  4. FY 2014 - Stockpile and Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  5. [Prevention and management of postresectional bronchopleural fistula].

    Science.gov (United States)

    Ishikawa, Shigemi

    2008-07-01

    Bronchopleural fistula (BPF) is still a life-threatening complication after pulmonary resection. Several factors were identified to contribute BPF. Meticulous surgical technique and the liberal use of prophylactic, pedicled flaps are important for prevention. Although these patients often present compromised and moribund, evaluation and management should proceed in a logical, stepwise fashion. In high-risk surgical patients, bronchoscopic procedures using different glues and sealants may serve as a temporary bridge until the patient's recovery or as a permanent resolution. However persistent conservative therapy may deteriorate patient's condition. Immediate creation of open window thoracotomy has been shown to be a significant predictor of wound closure afterwards. Pedicled muscle or omental flaps are useful to close bronchial stump and to fill the residual space in the thorax after pulmonary resection. Once fistula closed, the pleural space is filled with an antibiotic solution and then the open window thoracotomy closed in layers as Clagett procedure. The transternal transpericardial approach to recalcitrant postpneumonectomy BPF can be considered when patients have failed prior closure attempt. To conclude, survival and excellent result of BPF depends on early diagnosis, and aggressive surgical intervention.

  6. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  7. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  8. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-01-01

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user's guide to the Data Quality Objective process, and a self-assessment checklist

  9. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  10. LAND MANAGEMENT REGULATION AS AN INSTRUMENT FOR PLANNING IN UKRAINE

    OpenAIRE

    O. Dorosh; R. Buriak; I. Kupriyanchyk

    2017-01-01

    The presence of problems in the territorial management of land indicates that the system of state and municipal management does not meet the modern requirements of sustainable (balanced) development. The explanation is simple - if the planning of the development of territories of settlements takes place on the basis of approved urban planning documentation (master plans), then the territory of land tenure and land use outside their borders is notfully covered by development of land management...

  11. Planning and management of logistic cycle

    Directory of Open Access Journals (Sweden)

    V. N. Kudashkin

    2017-01-01

    Full Text Available We are considering planning and managing of logistic cycle, its impact on the content of the main processes that comprise the cycle to implement the order for the supply of material resources for industrial consumption, as well as its practical use, effectiveness, and prospects.This research paper is made on the basis of the information, received from textbooks and scientific literature of domestic and foreign authors, as well as from other sources. The main methods, used in this work are as follows: method of system analysis, method of the theory of operations’ research, prognostics. Application of these methods allows forecasting material flows, creating the integrated management systems and controlling their movements, developing systems of logistic service, to optimize supply stock and solve a number of other tasks.A logistic approach to form a modern system of logistics will save time, reduce costs for the purchase of material resources, their delivery and storage.In modern conditions of the market economy, the considered time parameters of the logistic chain are essential for manufacturing enterprises because their records significantly increase the efficiency of the logistical system.Logistics is equipped with a special complex of economic and mathematical models, the main feature of which is the adaptability, i.e. ability to solve complex optimization problems in the operational mode and in the process of the management of material flows. The primary role of these models in a market economy is to identify quickly points of compromise.Dynamics to functional cycles gives the necessity to align resource needs «input» and «output». «Input» functional cycle is an order that specifies requirements for a product or service. Logistical system, which is able to complete fully the order of any size, as a rule, needs in the «combined» functional cycles, including different transactions and operations at different stages. The «output» of

  12. Report realized in the name of the finances, economy and the plan commission on the project of financing law for 2009 (n. 1127), annex n. 13 ecology, sustainable development and management risks prevention planing of the ecology, the energy, the sustainable development and the territory management policies

    International Nuclear Information System (INIS)

    2008-01-01

    This document presents the law project n. 1127 for 2009, concerning the risks prevention in the framework of the ecology and the sustainable development and management. The first part details the program of risks prevention (technological, pollutions, natural and hydraulic risks, nuclear safety and radioprotection, the mine site rehabilitation). The second part develops the ecology, energy sustainable development and territory management, policies. (A.L.B.)

  13. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  14. Tank waste remediation system programmatic risk management plan

    International Nuclear Information System (INIS)

    Seaver, D.A.

    1995-01-01

    This risk management plan defines the approach to be taken to managing risks in the Tank Waste Remediation System (TWRS) program. It defines the actions to be taken at the overall program level, and the risk management requirements for lower-level projects and other activities. The primary focus of this plan is on ''programmatic'' risks, i.e., risks with respect to the cost, schedule, and technical performance of the program. The plan defines an approach providing managers with the flexibility to manage risks according to their specific needs, yet creates. The consistency needed for effectiveness across the program. The basic risk management approach uses a risk management list for the program, each project, and additional lower-level activities. The risk management list will be regularly reviewed and updated by appropriate level of management. Each list defines key risks, their likelihood and consequences, risk management actions to be taken, responsible individuals, and other management information

  15. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  16. Revisiting a programmatic planning approach: managing linkages between transport and land use planning

    NARCIS (Netherlands)

    Busscher, Tim; Tillema, Taede; Arts, Eric

    2013-01-01

    The body of knowledge on transport and land use planning shows considerable overlap with management theories and practices. Notable examples can be found in project management and strategic management. Recently, in the field of management theory, the idea of programme management has gained

  17. Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014.

    Science.gov (United States)

    Ndumele, Chima D; Schpero, William L; Schlesinger, Mark J; Trivedi, Amal N

    2017-06-27

    State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Plan exit, defined as the withdrawal of a managed care plan from a state's Medicaid program. Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10-point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state's Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95% CI, 1.7% to 6.0%]), and patient experience (73.5% vs 74.8%; difference, 1.3% [95% CI, 0.6% to 1

  18. Tribal Decisions-Makers Guide to Solid Waste Management: Chapter 2 - Developing Solid Waste Management Plans

    Science.gov (United States)

    Solid waste management plans offer a host of benefits for tribes and Alaskan Native villages. Through the preparation of these plans, you can assess your cur-rent and future waste management needs, set priorities, and allocate resources accordingly.

  19. Vodno načrtovanje in načrti upravljanja voda = Water planning and river basin management plans

    Directory of Open Access Journals (Sweden)

    Aleš Bizjak

    2008-01-01

    Full Text Available Directive 2000/60/EC – Water framework directive – is a milestone in history of waterpolicies in Europe. The Directive establishes a common framework for sustainable andintegrated management of all European surface and groundwaters, taking into accountall anthropogenic impact factors as well as economic implications of the preventive andsanitation measures. The ultimate objective of the Directive is to achieve good status of allwaters in the EU member states by the year 2015, with exemptions by 2021 or latest by 2027.The cornerstone of the Directive is the demand for integration and application of integratedwater management approach through the river basin management plans as well as publicparticipation and involvement.

  20. River Basin Management Plans - Institutional framework and planning process

    DEFF Research Database (Denmark)

    Frederiksen, Pia; Nielsen, Helle Ørsted; Pedersen, Anders Branth

    2011-01-01

    The report it a deliverable to the Waterpraxis project, based on research carried out in WP3. It is based on country reports from analyses of water planning in one river basin district in each of the countries Sweden, Finland, Latvia, Lithuania, Poland, Germany and Denmark, and it compares...... the institutional set-up, the public participation and the potentials and barriers for implementing the water plans....

  1. Guidelines for developing transportation management plans in Virginia.

    Science.gov (United States)

    2005-01-01

    A transportation management plan (TMP) is a comprehensive program of traffic control, communication, operation, and demand management strategies designed to maintain acceptable levels of traffic flow in work zones. A systematic procedure and/or check...

  2. Development of Kentucky's highway incident management strategic plan.

    Science.gov (United States)

    2005-05-01

    ven though Kentucky has undertaken many initiatives to improve specific aspects of incident management, there has never been a plan that establishes an overall framework for a systematic, statewide, multi-agency effort to improve the management of hi...

  3. AMADEUS Project Deliverable 1.2: Data Management Plan

    OpenAIRE

    Ana Belén Cristobal

    2018-01-01

    This document describes the initial Data Management Plan (DMP) for AMADEUS project. It addresses Project administration data collected as part of the execution and management of a disruptive research that could be in the market in the incoming years.

  4. Planned special events : cost management and cost recovery

    Science.gov (United States)

    2009-05-01

    This purpose of this primer is to aid jurisdictions and agencies, especially Departments of Transportation, with identifying and managing the costs of planned special events (PSEs) and forming policy for cost recovery. Cost management the effectiv...

  5. Cost accounting, management control, and planning in health care.

    Science.gov (United States)

    Siegrist, R B; Blish, C S

    1988-02-01

    Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)

  6. Link between traditional planning and energy management

    Energy Technology Data Exchange (ETDEWEB)

    Schweitzer, M.

    1981-01-01

    In simple terms, community energy planning is the process of envisioning a desired future state of energy supply and consumption for a local area and designing the appropriate measures to implement that future. While energy planning can be distinguished from other specialized concerns, such as housng or transportation planning, there are also major similarities which bind all these elements together. These similarities and differences are discussed. Community-level energy planning represents a natural extension of the comprehensive planning process. As the comprehensive plan has grown in the past to reflect new subjects of public concern such as environmental quality and economic development, so it can evolve further to address society's growing interest in energy use. Because the general purpose, process, and implementation devices associated with energy planning tie it closely with the comprehensive planning process as currently practiced, incorporating energy issues into the comprehensive plan should be a relatively simple matter.

  7. Wilderness management through voluntary behavior change: an evaluation of the Pemigewasset Wilderness Management Plan

    Science.gov (United States)

    John M. Halstead; Cindy M. Brown; Albert E. Luloff; Bruce E. Lindsay

    1992-01-01

    The management plan for the Pemigewasset Wilderness Area of New Hampshire represents a departure from traditional plans. Results of this study indicate limited evidence of the Pemigewasset Wilderness Management Plan (PWMP), as currently implemented, having a large direct impact on diverting hikers from their planned destinations and promoting dispersed usage and low...

  8. Preventing Stress in Organizations How to Develop Positive Managers

    CERN Document Server

    Donaldson-Feilder, Emma; Yarker, Joanna

    2011-01-01

    Preventing Stress in Organizations:How to Develop Positive Managersoffers an innovative, evidence-based approach to help managers prevent and reduce workplace stress in their staff.Provides information on the critical skills managers must develop in order to prevent stress in their staff, and the key ongoing behaviours that promote a healthy work environmentShows practitioners in occupational psychology, HR, Health and Safety and related professions how positive management can be integrated into an organization???s existing practices and processesServes as an essential guide for managers thems

  9. Chloropicrin Fumigant Management Plan Phase 2 Templates

    Science.gov (United States)

    These forms provide a framework for detailing the FMP elements of pesticide products containing the active ingredient chloropicrin, including application block, buffer zones, emergency response plan, tarp plan, soil conditions, and air monitoring.

  10. Dazomet Fumigant Management Plan Phase 2 Templates

    Science.gov (United States)

    These templates provide a framework for reporting application block information, buffer zones, emergency response plan, tarp plan, soil conditions, air monitoring, and more for pesticide products containing the active ingredient dazomet, such as Basamid G.

  11. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  12. Program Planning Concepts in Solid Waste Management

    Science.gov (United States)

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  13. Stroke Prevention: Managing Modifiable Risk Factors

    Directory of Open Access Journals (Sweden)

    Silvia Di Legge

    2012-01-01

    Full Text Available Prevention plays a crucial role in counteracting morbidity and mortality related to ischemic stroke. It has been estimated that 50% of stroke are preventable through control of modifiable risk factors and lifestyle changes. Antihypertensive treatment is recommended for both prevention of recurrent stroke and other vascular events. The use of antiplatelets and statins has been shown to reduce the risk of recurrent stroke and other vascular events. Angiotensin-converting enzyme inhibitors (ACEIs and angiotensin II receptor blockers (ARBs are indicated in stroke prevention because they also promote vascular health. Effective secondary-prevention strategies for selected patients include carotid revascularization for high-grade carotid stenosis and vitamin K antagonist treatment for atrial fibrillation. The results of recent clinical trials investigating new anticoagulants (factor Xa inhibitors and direct thrombin inhibitors clearly indicate alternative strategies in stroke prevention for patients with atrial fibrillation. This paper describes the current landscape and developments in stroke prevention with special reference to medical treatment in secondary prevention of ischemic stroke.

  14. Kaloko-Honokohau National Historical Park Air Tour Management Plan planning and NEPA scoping document

    Science.gov (United States)

    2004-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Kaloko-Honokohau Historic Park pursuant to the National Parks Air Tour Management ...

  15. Kalaupapa National Historic Park Air Tour Management Plan planning and NEPA scoping study

    Science.gov (United States)

    2005-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Kalaupapa Historic Park pursuant to the National Parks Air Tour Management Act of ...

  16. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Science.gov (United States)

    2011-09-22

    ... Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY... the Criteria for Developing Refuge Water Management Plans (Refuge Criteria). Several entities have each developed a Refuge Water Management Plan (Refuge Plan), which Reclamation has evaluated and...

  17. Risk management plans as a tool for proactive pharmacovigilance

    DEFF Research Database (Denmark)

    Vermeer, N S; Duijnhoven, R G; Straus, S M J M

    2014-01-01

    Risk Management Plans (RMPs) have become a cornerstone in the pharmacovigilance of new drugs in Europe. The RMP was introduced in 2005 to support a proactive approach in gaining knowledge on safety concerns through early planning of pharmacovigilance activities. However, the rate at which...... of uncertainties, suggests that opportunities for optimization exist while ensuring feasible and risk-proportionate pharmacovigilance planning....

  18. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    Science.gov (United States)

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  19. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  20. Managing Plan Implementation in the Asante Akyem South District ...

    African Journals Online (AJOL)

    Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges. ... This paper uses a case study approach to appraise the capacity of the Asante Akyem South District Assembly (AASDA) in managing the implementation of its development plans. Using questionnaires and ...

  1. 14 CFR 136.39 - Air tour management plans (ATMP).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Air tour management plans (ATMP). 136.39... management plans (ATMP). (a) Establishment. The Administrator, in cooperation with the Director, shall... of decision. (d) Procedure. In establishing an ATMP for a national park or tribal lands, the...

  2. 77 FR 60907 - Approval and Promulgation of Implementation Plans; Vermont: Prevention of Significant...

    Science.gov (United States)

    2012-10-05

    ... Promulgation of Implementation Plans; Vermont: Prevention of Significant Deterioration; Greenhouse Gas... February 14, 2011. The SIP revision modifies Vermont's Prevention of Significant Deterioration (PSD... at the U.S. Environmental Protection Agency, EPA New England Regional Office, Office of Ecosystem...

  3. 77 FR 5700 - Approval and Promulgation of Implementation Plans; New Hampshire: Prevention of Significant...

    Science.gov (United States)

    2012-02-06

    ... Promulgation of Implementation Plans; New Hampshire: Prevention of Significant Deterioration; Greenhouse Gas... revision modifies New Hampshire's Prevention of Significant Deterioration (PSD) program to establish... of Ecosystem Protection, Air Permits, Toxics, and Indoor Programs Unit, 5 Post Office Square--Suite...

  4. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    The Federal Financial Management Improvement Act of 1996 requires DoD financial management systems to comply substantially with Federal financial management system requirements, Federal accounting standards, and the U.S...

  5. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  6. Stormwater Pollution Prevention Plan - TA-60 Asphalt Batch Plant

    Energy Technology Data Exchange (ETDEWEB)

    Sandoval, Leonard Frank [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-31

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-01 Asphalt Batch Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Asphalt Batch Plant and associated areas. The current permit expires at midnight on June 4, 2020.

  7. Stormwater Pollution Prevention Plan - TA-60 Material Recycling Facility

    Energy Technology Data Exchange (ETDEWEB)

    Sandoval, Leonard Frank [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-31

    This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current permit expires at midnight on June 4, 2020.

  8. The experience of a nationwide Community of Practice to set up Regional Prevention Plans in Italy.

    Science.gov (United States)

    Giusti, Angela; Perra, Alberto; Lombardo, Flavia

    2017-07-27

    In 2010, the Italian Ministry of Health decided to start the planning process to elaborate the National Plan of Prevention 2010-2012 jointly with the 21 Regions. The National Institute of Health was responsible for supporting regional planners (RPs) by an original participatory approach of a web-based Community of Practice (CoP) to set up their own Regional Plans of Prevention. In this paper, we summarise the theoretical framework adopted, the main phases characterising the lifecycle of the nationwide CoP, the evaluation approach adopted and its findings. Following the CoP theoretical framework from Wenger, an initial group of RPs were trained on Project Cycle Management as a planning method and thereafter they started interacting on a web-based Moodle platform for 8 months. The CoP evaluation mainly took into account aspects of 'immediate value', such as members interactions within the website, and several quantitative and qualitative tools were used to monitor changes over time. Data were retrieved from Moodle statistics or directly from the RPs by the means of a Knowledge, Attitude and Practice survey, a reaction survey, SWOT analysis and focus groups. The level of individual RPs knowledge increased after the initial course from 55.7% to 75%, attitudes and competence perception about the planning process method also showed an overall favourable change. During the CoP life span, the number of members increased from the original 98 RPs to include up to 600 new members on the basis of spontaneous demand. From April 2010 to January 2011, the 'vital signs' of the CoP were monitored, including RP logins (13,450 total logins and 3744 unique logins), views (27,522) and posts (1606) distributed in 326 forum discussion threads. Data and information retrieved from quantitative and qualitative evaluation approaches proved to be useful for the management and follow-up of the CoP. The CoP experience was successful as 19 out of 20 Regions submitted their Regional Preventive

  9. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  10. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  11. Planning and management of cloud computing networks

    Science.gov (United States)

    Larumbe, Federico

    The evolution of the Internet has a great impact on a big part of the population. People use it to communicate, query information, receive news, work, and as entertainment. Its extraordinary usefulness as a communication media made the number of applications and technological resources explode. However, that network expansion comes at the cost of an important power consumption. If the power consumption of telecommunication networks and data centers is considered as the power consumption of a country, it would rank at the 5 th place in the world. Furthermore, the number of servers in the world is expected to grow by a factor of 10 between 2013 and 2020. This context motivates us to study techniques and methods to allocate cloud computing resources in an optimal way with respect to cost, quality of service (QoS), power consumption, and environmental impact. The results we obtained from our test cases show that besides minimizing capital expenditures (CAPEX) and operational expenditures (OPEX), the response time can be reduced up to 6 times, power consumption by 30%, and CO2 emissions by a factor of 60. Cloud computing provides dynamic access to IT resources as a service. In this paradigm, programs are executed in servers connected to the Internet that users access from their computers and mobile devices. The first advantage of this architecture is to reduce the time of application deployment and interoperability, because a new user only needs a web browser and does not need to install software on local computers with specific operating systems. Second, applications and information are available from everywhere and with any device with an Internet access. Also, servers and IT resources can be dynamically allocated depending on the number of users and workload, a feature called elasticity. This thesis studies the resource management of cloud computing networks and is divided in three main stages. We start by analyzing the planning of cloud computing networks to get a

  12. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    Science.gov (United States)

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  13. Advanced Hybrid Particulate Collector Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  14. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan. Revision 1

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-03-01

    This plan contains the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program. The plan outlines the activities and schedules developed by the ERC to reduce the quantity and toxicity of waste dispositioned as a result of restoration and remediation activities. This plan satisfies US Department of Energy (DOE) requirements including the Pollution Prevention Awareness program required by DOE Order 5400.1 (DOE 1988). This plan is consistent with Executive Order 12856 and Secretary O'Leary's pollution prevention Policy Statement of December 27, 1994, which set US and DOE pollution prevention policies, respectively. It is also consistent with the DOE Pollution Prevention Crosscut Plan, 1994, which provides guidance in meeting the DOE goals in pollution prevention. The purpose of this plan is to aid ERC projects in meeting and documenting compliance with requirements for WMin/P2. This plan contains the objectives, strategy, and support activities of the ERC Team WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Wherever appropriate, the ERC will integrate the pollution prevention activities in this plan into regular program activities rather than establishing separate WMin/P2 activities. Moreover, wherever possible, existing documents, procedures, and activities will be used to meet WMin/P2 requirements

  15. Adaptive Management Planning Projects as Conflict Resolution Processes

    Directory of Open Access Journals (Sweden)

    Greg Walkerden

    2006-06-01

    Full Text Available Adaptive management planning projects use multiparty, multidisciplinary workshops and simulation modeling to facilitate dialogue, negotiation, and planning. However, they have been criticized as a poor medium for conflict resolution. Alternative processes from the conflict resolution tradition, e.g., principled negotiation and sequenced negotiation, address uncertainty and biophysical constraints much less skillfully than does adaptive management. When we evaluate adaptive management planning using conflict resolution practice as a benchmark, we can design better planning procedures. Adaptive management planning procedures emerge that explore system structure, dynamics, and uncertainty, and that also provide a strong negotiation process, grounded in principled exploration of stakeholders' interests and needs. "Crossing" procedures in this manner is a fertile way of developing new forms of professional practice.

  16. Nurse manager succession planning: A cost-benefit analysis.

    Science.gov (United States)

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  17. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  18. Developing Tribal Integrated Waste Management Plans

    Science.gov (United States)

    An IWMP outlines how the tribe will reduce, manage, and dispose of its waste. It identifies existing waste systems, assesses needs, and sets forth the ways to design, implement, and monitor a more effective and sustainable waste management program.

  19. Spontaneous preterm birth : prevention, management and outcome

    NARCIS (Netherlands)

    Vermeulen, Gustaaf Michiel

    1999-01-01

    Preterm birth (birth before 37 completed weeks of pregnancy) is a major cause of perinatal morbidity and mortality. Strategies to prevent and adequately treat preterm labour, in order to postpone birth and to identify risk factors for neonatal damage due to preterm birth, have to be developed by

  20. Attitudes to malaria, prevention, treatment and management ...

    African Journals Online (AJOL)

    SERVER

    2007-11-05

    Nov 5, 2007 ... to clean environment, and most of times have no means of acquiring better mosquito-bite preventive measures and no access to modern treatment. Some of these conditions may greatly influence their knowledge and attitudes towards handling of malaria episode. Hence, it is the cardinal objective of this ...

  1. Tank waste remediation system tank waste retrieval risk management plan

    International Nuclear Information System (INIS)

    Klimper, S.C.

    1997-01-01

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure

  2. AEGIS: a wildfire prevention and management information system

    Science.gov (United States)

    Kalabokidis, Kostas; Ager, Alan; Finney, Mark; Athanasis, Nikos; Palaiologou, Palaiologos; Vasilakos, Christos

    2016-03-01

    We describe a Web-GIS wildfire prevention and management platform (AEGIS) developed as an integrated and easy-to-use decision support tool to manage wildland fire hazards in Greece (http://aegis.aegean.gr). The AEGIS platform assists with early fire warning, fire planning, fire control and coordination of firefighting forces by providing online access to information that is essential for wildfire management. The system uses a number of spatial and non-spatial data sources to support key system functionalities. Land use/land cover maps were produced by combining field inventory data with high-resolution multispectral satellite images (RapidEye). These data support wildfire simulation tools that allow the users to examine potential fire behavior and hazard with the Minimum Travel Time fire spread algorithm. End-users provide a minimum number of inputs such as fire duration, ignition point and weather information to conduct a fire simulation. AEGIS offers three types of simulations, i.e., single-fire propagation, point-scale calculation of potential fire behavior, and burn probability analysis, similar to the FlamMap fire behavior modeling software. Artificial neural networks (ANNs) were utilized for wildfire ignition risk assessment based on various parameters, training methods, activation functions, pre-processing methods and network structures. The combination of ANNs and expected burned area maps are used to generate integrated output map of fire hazard prediction. The system also incorporates weather information obtained from remote automatic weather stations and weather forecast maps. The system and associated computation algorithms leverage parallel processing techniques (i.e., High Performance Computing and Cloud Computing) that ensure computational power required for real-time application. All AEGIS functionalities are accessible to authorized end-users through a web-based graphical user interface. An innovative smartphone application, AEGIS App, also

  3. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  4. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  5. Los Alamos National Laboratory emergency management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  6. Ground data system resource allocation planning to support mission management

    Science.gov (United States)

    Durham, Ralph; Reilly, Norman B.; Springer, Joe B.; Taylor, Thomas M.

    1990-10-01

    Mission planning and manangement optimization using unique planning methodologies is described. The ground data system resource allocation process provides mission planners and managers with both short and long range visibility of resource loading. Launch dates, mission designs, and spacecraft sequencing can be planned to optimize science return despite limited resources. Periods of resource contention are identified for managers of flying missions in time for them to plan and implement alternatives rather than be forced to react hastily to unforeseen conflicts. Conflict resolution is by consensus, and a simple route of appeal is provided.

  7. 77 FR 74662 - Federal Acquisition Regulation; Submission for OMB Review; Accident Prevention Plans and...

    Science.gov (United States)

    2012-12-17

    ... contractors to keep records of accidents incident to work performed under the contract that result in death... Regulation; Submission for OMB Review; Accident Prevention Plans and Recordkeeping AGENCIES: Department of... extension of a previously approved ] information collection requirement concerning Accident Prevention Plans...

  8. Risk Prevention Strategies and the SWOT Analysis for the Implementation of the SMEs’ Business Plan

    Directory of Open Access Journals (Sweden)

    Ionica Oncioiu

    2014-10-01

    Full Text Available This theme is targeting the importance of implementing the business plan of a small and medium company that has as aim the creation of the added value through research and innovation in the management of human resources performance based on information technology domain. The objective is to increase the economic competitiveness and development of knowledge-based economy whereas by the implementation of the project, it increases the company‟s profitability, creating a competitive advantage resulting in innovative products, as well as the effectiveness of companies that use human resources evaluation platform. The need identified on the market to which the SMEs wish to answer by implementing the plan is represented by the nationwide lack of a complex solution covering both the evaluation and the management of human resources performances. The used methodology can be found in the analysis, developing a strategy for preventing financial, human, market, marketing - image risks and also the physical ones. With the SWOT analysis it was observed one of the strengths i.e. the existence of a single management system of employee performance that includes assessment specific features. In conclusion, there are no software solutions at national level, which would assess the human resources of an organization, following specific indicators of that organization, which could combine the assessment methods in order to achieve more a more efficient and versatile assessment.

  9. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  10. Report realized in the name of the finances, economy and the plan commission on the project of financing law for 2009 (n. 1127), annex n. 13 ecology, sustainable development and management risks prevention planing of the ecology, the energy, the sustainable development and the territory management policies; Rapport fait au nom de la commission des finances, de l'economie generale et du plan sur le projet de loi de finances pour 2009 (n. 1127), annexe n. 13 ecologie, developpement et amenagement durables prevention des risques conduite et pilotage des politiques de l'ecologie, de l'energie, du developpement durable et de l'amenagement du territoire

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This document presents the law project n. 1127 for 2009, concerning the risks prevention in the framework of the ecology and the sustainable development and management. The first part details the program of risks prevention (technological, pollutions, natural and hydraulic risks, nuclear safety and radioprotection, the mine site rehabilitation). The second part develops the ecology, energy sustainable development and territory management, policies. (A.L.B.)

  11. Obesity Prevention and Management Strategies in Canada: Shifting Paradigms and Putting People First.

    Science.gov (United States)

    Sharma, Arya M; Ramos Salas, Ximena

    2018-04-17

    The purpose of this study was to review public and private sector obesity policies in Canada and to make recommendations for future evidence-based obesity prevention and management strategies. Synthesis of obesity prevention and management policies and research studies are presented in three primary themes: (1) Increased awareness about the impact of weight bias and obesity stigma in Canada; (2) Inadequate government obesity prevention and management policies and strategies; and (3) Lack of comprehensive private sector obesity prevention and management policies. Findings suggest that in Canada, obesity continues to be treated as a self-inflicted risk factor, which affects the type of interventions and approaches that are implemented by governments or covered by private health plans. The lack of recognition of obesity as a chronic disease by Canadian public and private payers, health systems, employers, and the public, has a trickle-down effect on access to evidence-based prevention and treatment. Although there is increasing recognition and awareness about the impact of weight bias and obesity stigma on the health and social well-being of Canadians, interventions are urgently needed in education, healthcare, and public policy sectors. We conclude by making recommendations for the advancement of evidence-based obesity prevention and management policies that can improve the lives of Canadians affected by obesity.

  12. ACTDs: Management Plans as Predictors of Transition

    National Research Council Canada - National Science Library

    Phelps, Matthew; Wideman, Jeffrey S

    2007-01-01

    .... The methodology included case analysis of thirty-eight ACTD program business plans. Nineteen of the programs transitioned while the other nineteen were terminated either prior to the Military Unit Assessment (MUA...

  13. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  14. Towards sustainable energy planning and management

    DEFF Research Database (Denmark)

    Østergaard, Poul Alberg; Sperling, Karl

    2014-01-01

    Rising energy costs, anthropogenic climate change, and fossil fuel depletion calls for a concerted effort within energy planning to ensure a sustainable energy future. This article presents an overview of global energy trends focusing on energy costs, energy use and carbon dioxide emissions....... Secondly, a review of contemporary work is presented focusing on national energy pathways with cases from Ireland, Denmark and Jordan, spatial issues within sustainable energy planning and policy means to advance a sustainable energy future....

  15. [Interdisciplinary quality management in preventive medicine institutions].

    Science.gov (United States)

    Fischer, Robert

    2004-12-01

    Like all health care institutions, preventive medicine institutions, too, need a quality assurance structure. An integrated system consisting of "balanced score card", "finite-elements-model" and "interdisciplinary quality circles" is presented. This organisational structure allows the implementation of quality assurance in complex institutions as well, such as health care organisations. In addition, this concept guarantees broad acceptance by all team members, not least due to complexity reduction.

  16. Risk Management Plan (RMP) Rule Overview

    Science.gov (United States)

    As required by Section 112(r) of the Clean Air Act Amendments, this rule contains regulations and guidance for chemical accident prevention at facilities that use extremely hazardous substances, and aids in emergency preparedness and response.

  17. Soedra's ecological forest management plans. Effects on production and economy

    International Nuclear Information System (INIS)

    Viklund, E.

    1998-01-01

    In 1995 SOEDRA Skog, Sweden's largest forest owners association, started making ecological forest management plans, Groena skogsbruksplaner. The ecological forest management plans are divided into different compartments in which the management is adapted to the present ecological conditions. The stands are divided into four different categories depending on the different values of nature conservation. The object of this study was to find an easy method to quantify and describe the effects of nature conservation on economy and forest production in SOEDRA:s ecological forest management plans. The developed and purposed method, called PLAN-metoden, does not consider the interests, measures beyond the period of the plan, or losses due to snow or wind. It calculates the difference between the purposed measures in the ecological management plan and an alternative with management according to the requirements of the present Forestry Act. The economic effects of nature conservation varies between a net profit of 0,3% and a cost of 9,1% when calculated with the cash-flow method. The average decrease of possible cutting of merchantable timber was 11,3% and varies between 3,1 and 32,9%. The average decrease of cutting possibilities was 12,9% and varies between a decrease of 0,7% and a decrease of 28,3% when calculated with a present value method. Mainly mature, well-stocked compartments, which are considered not to be managed in the future, give rise to high costs. Properties with unprofitable thinnings and costly scarification, regeneration and cleaning seem to be favoured by the nature conservation in the plans. The Ecological management plans are expected to be of great importance to the members of SOEDRA. The interest in nature conservation is larger than that of economical issues. In order to avoid unsatisfactory results the planning should be accomplished in close personal contact with the forest owner Examination paper 1998-1. 21 refs, 2 figs, 39 tabs

  18. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  19. Management of Diverticulitis and Prevention of Recurrence

    Directory of Open Access Journals (Sweden)

    Paolo Andreozzi

    2015-12-01

    Full Text Available Acute diverticulitis is an acute inflammation of colonic diverticulae that is associated with an episode of severe, prolonged, lower abdominal pain (usually on the left side, changes in bowel movements, low-grade fever, and leukocytosis. Acute diverticulitis is a significant burden in industrialised societies, accounting for 313,000 hospitalisations in the USA alone, and a trend of rising incidence has been observed. Despite the high prevalence, the management of diverticulitis and post-diverticulitis is largely based on consensus more than evidence derived from randomised clinical trials. In this review we will focus on the diagnosis and management strategies for diverticulitis and post-diverticulitis.

  20. Best management practices plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-02-01

    This Best Management Practices (BMP) Plan has been developed as part of the environmental monitoring program at Waste Area Grouping (WAG) 6. The BMP Plan describes the requirements for personnel training, spill prevention and control, environmental compliance, and sediment/erosion control as they relate to environmental monitoring activities and installation of Monitoring Station 4 at WAG 6

  1. Social Impact Management Plans: Innovation in corporate and public policy

    International Nuclear Information System (INIS)

    Franks, Daniel M.; Vanclay, Frank

    2013-01-01

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  2. EPA Region 3 Quality Management Plans

    Science.gov (United States)

    Has links to resources that describe the Region's Quality Assurance Program, which is a collection of the Region's ongoing quality assurance (QA) policies, procedures, responsibilities and management systems.

  3. An Ounce of Prevention: Child Management.

    Science.gov (United States)

    Merrill, Barbara, Ed.

    This training manual on child management consists of eight workshops for day care center staff. Workshops focus on (1) communications skills useful in working with children; (2) the nature of discipline; (3) positive approaches to guiding children's behavior; (4) natural and logical consequences; (5) ways of dealing with problem behavior; (6) the…

  4. Prevention and management of cesarean wound infection.

    Science.gov (United States)

    Fitzwater, Joseph L; Tita, Alan T N

    2014-12-01

    Cesarean wound infections represent a significant health and economic burden. Several modifiable risk factors have been identified for their development. Understanding these risks and techniques to manage cesarean wounds is essential for providers. In this article, these factors and prophylactic and therapeutic interventions are reviewed. Copyright © 2014 Elsevier Inc. All rights reserved.

  5. Uses of data to plan cancer prevention and control programs.

    OpenAIRE

    Boss, L P; Suarez, L

    1990-01-01

    Seven State health departments, those in Illinois, Nebraska, New Jersey, New York, North Carolina, Texas, and Wisconsin, have participated in an effort to utilize a variety of State-specific cancer-related data to describe the cancer burden in their State's population. The data were then used to develop a statewide cancer plan or supplement an existing plan to address the defined problems. Cancer data have not been well utilized in the planning of intervention programs in the past, and the ef...

  6. Nurse manager residency program: an innovative leadership succession plan.

    Science.gov (United States)

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  7. Development of preventative streamside landslide buffers on managed timberlands

    Science.gov (United States)

    Jason S. Woodward; Matthew R. House; David W. Lamphear

    2017-01-01

    Shallow streamside landslides are a principle source of sediment on managed timberlands in northern California. Using an adaptive management process, LiDAR, and a detailed field-based landslide inventory, Green Diamond Resource Company (GDRCo) has redefined the interim preventative landslide tree-retention buffers it applies to steep streamside slopes along...

  8. Preventive maintenance - An important element in the `risk management` philosophy

    Energy Technology Data Exchange (ETDEWEB)

    Gullev, Lars [VEKS (Denmark)

    1996-11-01

    The contents of the paper is a presentation of the company VEKS with particular focus on the connection between preventive maintenance and the `Risk Management` philosophy. Implementation of Risk Management was preferred instead of an ISO-9000 certification of the company. The experience is that the responsibility in the organisation has been increased. (au)

  9. Software Configuration Management Plan for the Sodium Removal System

    Energy Technology Data Exchange (ETDEWEB)

    HILL, L.F.

    2000-03-06

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.

  10. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    International Nuclear Information System (INIS)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan

  11. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    International Nuclear Information System (INIS)

    Fritz, R.L.

    1995-01-01

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities

  12. Towards Data Management Planning Support for Research Data

    NARCIS (Netherlands)

    Görzig, Heike; Engel, Felix; Brocks, Holger; Vogel, Tobias; Hemmje, Matthias

    2015-01-01

    Görzig, H., Engel, F., Brocks, H., Vogel, T. & Hemmje, M. (2015, August). Towards Data Management Planning Support for Research Data. Paper presented at the ASE International Conference on Data Science, Stanford, United States of America.

  13. Comparison of the NCRA and NAACCR Strategic Management Plans.

    Science.gov (United States)

    Menck, Herman R

    2012-01-01

    The Strategic Management Plans of the National Cancer Registrars Association (NCRA) and the North American Association of Central Cancer Registries (NAACCR) were compared, and differences noted. No uncovered subject areas were found.

  14. Grout Treatment Facility Land Disposal Restriction Management Plan

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1991-01-01

    This document establishes management plans directed to result in the land disposal of grouted wastes at the Hanford Grout Facilities in compliance with Federal, State of Washington, and Department of Energy land disposal restrictions. 9 refs., 1 fig

  15. Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans

    Science.gov (United States)

    The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.

  16. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  17. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  18. Software Configuration Management Plan for the Sodium Removal System

    International Nuclear Information System (INIS)

    HILL, L.F.

    2000-01-01

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test

  19. Incident Management Organization succession planning stakeholder feedback

    Science.gov (United States)

    Anne E. Black

    2013-01-01

    This report presents complete results of a 2011 stakeholder feedback effort conducted for the National Wildfire Coordination Group (NWCG) Executive Board concerning how best to organize and manage national wildland fire Incident Management Teams in the future to meet the needs of the public, agencies, fire service and Team members. Feedback was collected from 858...

  20. Smallholder integrated crop management (ICM) research planning ...

    African Journals Online (AJOL)

    Mo

    farmers about their smallholder farm management practices. The results of the workshop would guide us in our effort to work with farmers to improve and sustain the land and crop management strategies used in Kayunga and Mukono districts. Approaches and Methods. Project core team. Scientists of Mukono ARDC and a ...

  1. Spent Nuclear Fuel Project Configuration Management Plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This document is a rewrite of the draft ''C'' that was agreed to ''in principle'' by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project

  2. Residuals Management and Water Pollution Control Planning.

    Science.gov (United States)

    Environmental Protection Agency, Washington, DC. Office of Public Affairs.

    This pamphlet addresses the problems associated with residuals and water quality especially as it relates to the National Water Pollution Control Program. The types of residuals and appropriate management systems are discussed. Additionally, one section is devoted to the role of citizen participation in developing management programs. (CS)

  3. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  4. Leadership and management curriculum planning for Iranian general practitioners

    OpenAIRE

    KHOSRAVAN, SHAHLA; KARIMI MOONAGHI, HOSSEIN; YAZDANI, SHAHRAM; AHMADI, SOLEIMAN; MANSOORIAN, MOHAMMAD REZA

    2015-01-01

    Introduction: Leadership and management are two expected features and competencies for general practitioners (GPs). The purpose of this study was leadership and management curriculum planning for GPs which was performed based on Kern’s curriculum planning cycle. Methods: This study was conducted in 2011-2012 in Iran using an explanatory mixed-methods approach. It was conducted through an initial qualitative phase using two focus group discussions and 28 semi-structured in...

  5. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  6. QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY

    Science.gov (United States)

    EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...

  7. Strategic planning features of subsurface management in Kemerovo Oblast

    Science.gov (United States)

    Romanyuk, V.; Grinkevich, A.; Akhmadeev, K.; Pozdeeva, G.

    2016-09-01

    The article discusses the strategic planning features of regional development based on the production and subsurface management in Kemerovo Oblast. The modern approach - SWOT analysis was applied to assess the regional development strategy. The estimation of regional development plan implementation was given for the foreseeable future.

  8. Information security management system planning for CBRN facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lenaeu, Joseph D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); O' Neil, Lori Ross [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leitch, Rosalyn M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Glantz, Clifford S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Landine, Guy P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bryant, Janet L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lewis, John [National Nuclear Lab., Workington (United Kingdom); Mathers, Gemma [National Nuclear Lab., Workington (United Kingdom); Rodger, Robert [National Nuclear Lab., Workington (United Kingdom); Johnson, Christopher [National Nuclear Lab., Workington (United Kingdom)

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  9. Forest management planning for timber production: a sequential approach

    Science.gov (United States)

    Krishna P. Rustagi

    1978-01-01

    Explicit forest management planning for timber production beyond the first few years at any time necessitates use of information which can best be described as suspect. The two-step approach outlined here concentrates on the planning strategy over the next few years without losing sight of the long-run productivity. Frequent updating of the long-range and short-range...

  10. Land management planning: a method of evaluating alternatives

    Science.gov (United States)

    Andres Weintraub; Richard Adams; Linda Yellin

    1982-01-01

    A method is described for developing and evaluating alternatives in land management planning. A structured set of 15 steps provides a framework for such an evaluation. when multiple objectives and uncertainty must be considered in the planning process. The method is consistent with other processes used in organizational evaluation, and allows for the interaction of...

  11. Management of Diverticulitis and Prevention of Recurrence

    OpenAIRE

    Paolo Andreozzi; Francesco Paolo Zito; Giovanni Sarnelli; Rosario Cuomo

    2015-01-01

    Acute diverticulitis is an acute inflammation of colonic diverticulae that is associated with an episode of severe, prolonged, lower abdominal pain (usually on the left side), changes in bowel movements, low-grade fever, and leukocytosis. Acute diverticulitis is a significant burden in industrialised societies, accounting for 313,000 hospitalisations in the USA alone, and a trend of rising incidence has been observed. Despite the high prevalence, the management of diverticulitis and post-dive...

  12. Workplace managed care: collaboration for substance abuse prevention.

    Science.gov (United States)

    Galvin, D M

    2000-05-01

    This article describes the history, purpose, and overall methodology of the Workplace Managed Care (WMC) study sponsored by the Substance Abuse and Mental Health Services Administration, Center for Substance Abuse Prevention (CSAP). This study was initiated to discern best practices for workplaces and managed care organizations integrating their substance abuse prevention and early intervention programs, strategies, and activities for employees and their families. CSAP funded nine WMC grants to study their retrospective and prospective data. Results of the WMC study suggested the addition of substance abuse prevention material to existing workplace health promotion offerings that resulted in improved substance abuse attitudes without jeopardizing existing health promotion programs. Stress management programming was successful at improving substance abuse attitudes indirectly. This study provides a platform for multidisciplinary research in workplace and managed care settings.

  13. The prevention research centers' managing epilepsy well network.

    Science.gov (United States)

    DiIorio, Colleen K; Bamps, Yvan A; Edwards, Ariele L; Escoffery, Cam; Thompson, Nancy J; Begley, Charles E; Shegog, Ross; Clark, Noreen M; Selwa, Linda; Stoll, Shelley C; Fraser, Robert T; Ciechanowski, Paul; Johnson, Erica K; Kobau, Rosemarie; Price, Patricia H

    2010-11-01

    The Managing Epilepsy Well (MEW) Network was created in 2007 by the Centers for Disease Control and Prevention's (CDC) Prevention Research Centers and Epilepsy Program to promote epilepsy self-management research and to improve the quality of life for people with epilepsy. MEW Network membership comprises four collaborating centers (Emory University, University of Texas Health Science Center at Houston, University of Michigan, and University of Washington), representatives from CDC, affiliate members, and community stakeholders. This article describes the MEW Network's background, mission statement, research agenda, and structure. Exploratory and intervention studies conducted by individual collaborating centers are described, as are Network collaborative projects, including a multisite depression prevention intervention and the development of a standard measure of epilepsy self-management. Communication strategies and examples of research translation programs are discussed. The conclusion outlines the Network's role in the future development and dissemination of evidence-based epilepsy self-management programs. Copyright © 2010 Elsevier Inc. All rights reserved.

  14. Planning, Management, and Economics of Airport Operation

    Science.gov (United States)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  15. Integrating Risk Management and Strategic Planning

    Science.gov (United States)

    Achampong, Francis K.

    2010-01-01

    Strategic planning is critical to ensuring that institutions of higher education thoughtfully and systematically position themselves to accomplish their mission, vision, and strategic goals, particularly when these institutions face a myriad of risks that can negatively impact their continued financial viability and compromise their ability to…

  16. BUSINESS PLAN - MANAGEMENT TOOL OF THE ENTREPRENEUR

    Directory of Open Access Journals (Sweden)

    Nicoleta Ciucescu

    2016-06-01

    Full Text Available This paper proposes to highlight the importance of developing of a business plan, which is an indispensable tool for any entrepreneur, aims to reduce the degree of uncertainty in entrepreneurial activity, to reduce the company's environmental vulnerability. Thus the objectives of the paper consist on presentation of the concept define, the role, the functions of the business plan, also the typology, the stages concerning the preparation and the content. of it. The research method was to use a comparative study of the specialty literature. The business plan represents a logical flowchart of action, which involves perspective on thinking on a business, starting from certain objectives, helping to create an overall picture of the whole business. Basically it covers all stages and resources which will be necessary to an entrepreneur to achieve the proposed objectives in a predetermined time period. The business plan offers the possibility to assess the chances of success of businesses, representing a means to control for the entrepreneur on profitability and business viability through a systemic analysis of a comprehensive set of rigorously structured informations, providing thereby the knowing of all aspects involved in business and the effective and in depth preparing.

  17. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  18. Quality Management Plan for EPA Region 1

    Science.gov (United States)

    The QMP describes policies, procedures & management systems within EPA NE that govern quality assurance & quality control activities supporting the transparency & scientific defensibility of environmental data collected, used & disseminated by the Region.

  19. REGINALT - a tool for management planning

    International Nuclear Information System (INIS)

    Loughead, J.S.C.

    1987-01-01

    REGINALT is a computer-based decision support system that can be used by non-programmers to evaluate a comprehensive approach to commercial low-level radioactive waste (LLRW) management. REGINALT allows a waste management person to consider technical, financial, and scheduling differences between possible scenarios. This paper explains the type of data which are needed, how these data are processed, and the type of reports available from the REGINALT system. 2 figures, 3 tables

  20. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... used to keep the public informed and involved throughout the planning process for the Addition. The...--the continuation of current management practices and trends. The enabling legislation would be the...

  1. Oak Ridge National Laboratory Environmenal, Safety, and Health Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The 1990 Tiger Team Appraisal of Oak Ridge National Laboratory (ORNL) revealed that neither Martin Marietta Energy Systems, Inc. (Energy Systems) nor ORNL had a strategic plan for Environmental, Safety, and Health (ES ampersand H) activities. There were no detailed plans describing ORNL's mission, objectives, and strategies for ES ampersand H activities. A number of plans do exist that cover various aspects of ES ampersand H. Their scope ranges from multiyear program plans to annual audit schedules to compliance plans to action plans from specific audits. However, there is not a single document that identifies the plans and the objectives they are to address. This document describes the strategic plan for ORNL and provides the linkage among existing plans. It gives a brief description of the organization and management of ES ampersand H activities at ORNL. The plan identifies the general strategies to be taken by ORNL, using the overall guidance from Energy Systems in its corporate ES ampersand H Strategic Plan. It also identifies more detailed plans for implementation of these strategies, where appropriate

  2. Financial performance of health plans in Medicaid managed care.

    Science.gov (United States)

    McCue, Mike

    2012-01-01

    This study assesses the financial performance of health plans that enroll Medicaid members across the key plan traits, specifically Medicaid dominant, publicly traded, and provider-sponsored. National Association of Insurance Commissioners (NAIC) financial data, coupled with selected state financial data, were analyzed for 170 Medicaid health plans for 2009. A mean test compared the mean values for medical loss, administrative cost, and operating margin ratios across these plan traits. Medicaid dominant plans are plans with 75 percent of their total enrollment in the Medicaid line of business. Plans that are Medicaid dominant and publicly traded incurred a lower medical loss ratio and higher administrative cost ratio than multi-product and non-publicly traded plans. Medicaid dominant plans also earned a higher operating profit margin. Plans offering commercial and Medicare products are operating at a loss for their Medicaid line of business. Health plans that do not specialize in Medicaid are losing money. Higher medical cost rather than administrative cost is the underlying reason for this financial loss. Since Medicaid enrollees do not account for their primary book of business, these plans may not have invested in the medical management programs to reduce inappropriate emergency room use and avoid costly hospitalization.

  3. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  4. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  5. 40 CFR 60.2899 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  6. 40 CFR 60.2055 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  7. 40 CFR 62.14580 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  8. 76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management

    Science.gov (United States)

    2011-07-01

    ... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...

  9. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-06-05

    ... Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Contra Costa Water District. City of Santa... Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans...

  10. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-11-16

    ... Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The following Water Management Plans are available for review: Orland-Artois Water District Kern Tulare Water... Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans...

  11. Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993

    International Nuclear Information System (INIS)

    Jannik, G.T.; Mamatey, A.; Arnett, M.

    1993-01-01

    In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue to analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments

  12. Implementation and planning of preventive and multi-layered contaminated water treatment

    International Nuclear Information System (INIS)

    Takahashi, Takeshi; Arai, Tomoyuki

    2014-01-01

    In Fukushima Daiichi D and D activities, one of the most challenging issues is contaminated water management. In order to control ground water inflow into the buildings so that amount of contaminated water does not increase and prevent contaminated water spread out to the environment including into the ocean, TEPCO are taking various measures: In order to remove contamination sources, the removal of the highly contaminated water in the seaside trenches are being implemented. And also, the acceleration of water purification is planned by contaminated water clean-up facility. For the purpose of Isolating water from contaminated sources, construction of the frozen-soil land-side wall started in order to prevent the groundwater from flowing in the area and contaminated water from flowing out from the area. In order to prevent leakage of contaminated water into the ocean, soil improvement with sodium silicate (liquid glass) and Installation of the sea-side impermeable walls are implemented. Furthermore, replacement of the flange-type tanks with welded-joint tanks to mitigate leakage risks is underway. (author)

  13. Your Game Plan to Prevent Type 2 Diabetes

    Science.gov (United States)

    ... plans this week, I’ll watch a movie. Pick one step to try this week. Add one ... FAQs About NIDDK Meet the Director Offices & Divisions Staff Directory Budget & Legislative Information Advisory & Coordinating Committees Strategic ...

  14. "Hepatitis" - Prevention and management in dental practice.

    Science.gov (United States)

    Dahiya, Parveen; Kamal, Reet; Sharma, Varun; Kaur, Saravpreet

    2015-01-01

    Today, viral hepatitis has become a silent epidemic worldwide. It is the major cause of liver cirrhosis and liver carcinoma. In a dental office, infections can be expedited through several routes, including direct or indirect contact with blood, oral fluids, droplet splatter, aerosols, etc. The aim of the present review is to increase the awareness among dental practitioners, so as to reduce the burden of hepatitis in their community. Electronic databases like PubMed, Medline, ProQuest, etc. were searched using the keywords hepatitis, dentist, liver disease, and infection control. Manual search of various journals and books was also carried out. Only highly relevant articles from English literature were considered for the present review. The results revealed that the dentists were among the high-risk groups for hepatitis, and they have little information on the factors associated with adherence to hepatitis B vaccination. A dentist can play a major role in the prevention of hepatitis by considering each and every patient as a potential carrier of hepatitis. Proper infection control, sterilization, and prophylactic vaccination protocols should be followed in order to reduce the risk of hepatitis.

  15. Hypoparathyroidism after thyroidectomy: prevention, assessment and management.

    Science.gov (United States)

    Dedivitis, Rogerio A; Aires, Felipe T; Cernea, Claudio R

    2017-04-01

    Permanent hypoparathyroidism is the most common long-term complication after total thyroidectomy and it can cause significant morbidity and increased costs. Its incidence varies from 30% to 60%. The surgical technique and the extent of thyroidectomy are related to parathyroid injury and hypoparathyroidism. The glands should be identified in situ, carefully manipulated and preserved, as well as their vascularization. In case of incidental removal, routine autotransplantation is advocated. Low calcium levels, identification of fewer than two parathyroid glands at surgery, reoperation for bleeding, Graves disease and heavier thyroid specimens were considered independent predictors of permanent hypocalcemia. Intraoperative parathyroid hormone (PTH) measurements allows the early detection of hypocalcemia. Treatment is recommended for patients with symptoms of hypocalcemia or corrected serum calcium Hypoparathyroidism is the most common long-term complication after total thyroidectomy. Adequate recognition and management decrease its morbidity and costs.

  16. Planning and Management Guidelines for Inland Lake Property Owners.

    Science.gov (United States)

    Van Dusen, Peter; Marsh, William M.

    This booklet is designed to assist prospective and established property owners in the selection, planning, and management of lake lands. It is organized into three parts: (1) selection and preparation of a building site; (2) property management; and (3) community development. These sections outline some basic guidelines for land development and…

  17. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... harvest levels based on intensified management practices, such as reforestation, thinning, and tree... have any substantive legal effect but it simply makes clear that the planning rule complies with the... consider the effects of an explicit intensified-management-practices provision among alternatives, because...

  18. Department of Defense Strategic Management Plan FY 2012 - FY 2013

    Science.gov (United States)

    2011-09-20

    contingencies; preserve and enhance the All-Volunteer Force; and reform the business and support functions of the Defense enterprise. This Strategic ... Management Plan (SMP) establishes management goals for business operations linked to the DoD’s overarching strategic goals and objectives. Amplifying the

  19. Perception of scale in forest management planning: Challenges and implications

    Science.gov (United States)

    Swee May Tang; Eric J. Gustafson

    1997-01-01

    Forest management practices imposed at one spatial scale may affect the patterns and processes of ecosystems at other scales. These impacts and feedbacks on the functioning of ecosystems across spatial scales are not well understood. We examined the effects of silvicultural manipulations simulated at two spatial scales of management planning on landscape pattern and...

  20. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    The provision of environment management plan and formulating the environmental strategies of coastal regions are the most essential measures required for the integrated management of coastal regions. For this purpose, this research has been conducted using two goal-oriented and problem-oriented approaches in ...

  1. A Model for Understanding Management Manpower: Forecasting and Planning

    Science.gov (United States)

    Deckard, Noble S.; Lessey, Kenneth W.

    1975-01-01

    The authors, realizing the importance of continuous organizational reappraisal of manpower needs and strengths, have developed a model based on supply of management manpower and demand for management manpower. Without a manpower forecasting/planning program, the future needs of the organization are reduced to guesswork. (EA)

  2. Best management practices for creating a community wildfire protection plan

    Science.gov (United States)

    Pamela J. Jakes; Christine Esposito; Sam Burns; Antony S. Cheng; Kristen C. Nelson; Victoria E. Sturtevant; Daniel R. Williams

    2012-01-01

    A community wildfire protection plan (CWPP) is a means of bringing local solutions to wildland fire management. In developing and implementing CWPPs, communities assume a leadership role in reducing wildfi re risk on federal and nonfederal land. In this publication, we identify best management practices for CWPP development and implementation based on the experiences...

  3. Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994

    International Nuclear Information System (INIS)

    Turner, J.W.

    1993-12-01

    US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, open-quotes Waste Management Plan Outline.close quotes These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES ampersand H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are

  4. Crisis management: Planning for the inevitable

    Directory of Open Access Journals (Sweden)

    Niyaz Aboudzadeh

    2014-06-01

    Full Text Available The aim of this study is to identify important factors influencing organizational readiness to deal with the crisis in business organizations. The study designs a questionnaire in Likert scale and distributes it among some experts who work for Mapna company in Iran. The study uses the method developed by Mitroff (2005 [Mitroff, I. I. (2005. Why some companies emerge stronger and better from a crisis: 7 essential lessons for surviving disaster. AMACOM Div American Mgmt Assn.], which investigates the effects of four factors including job satisfaction, increase in income, cost reduction and change in strategies on crisis management. Using Pearson correlation ratio, the study has confirmed a positive and meaningful relationship between crisis management and three factors including increase in income, cost reduction and change in strategies. However, the study did not find any evidence to support the relationship between job satisfaction and crisis management.

  5. TERMAL BALANCE MANAGEMENT FOR INTRADIALYSIS HYPOTENSION PREVENTION

    Directory of Open Access Journals (Sweden)

    A. G. Strokov

    2012-01-01

    Full Text Available Intradialytic hypotension (IDH remains an important cause of morbidity and mortality in chronic hemodialysis (HD patients and can be ameliorated by low temperature HD. Biofeed-back temperature-control device BTM® (Fresenius Medical Care, Germany was used for precision temperature measurement and to deliver isothermic (ITD or thermoneutral (TND dialysis. At stage one 24 stable dialysis patients were studied in terms of inlet blood temperature (IBT variation during sessions with normal (36,5 °С-ND and cold dialysate (35 °С-CD. IBT was increasing in both cases however the increase was significantly lower in CD. At stage two, 18 patients underwent programmed cooling during two ITD and two TND sessions. In TND high correlation (r = 0.66; р < 0.05 was observed between IBT increase and ultrafiltration rate. Keeping IBT stable during ITD required cons- tant decrease of dialysate temperature to 34.9 ± 0.2 °С at the end of session. At stage three, 19 IDH-prone patients were displaced from regular dialysis program to ITD. As a result,the decrease overall rate of IDH from 36.2 ± 1.1% to 11.3 ± 4,6% was observed. Conclusions: 1. The main mechanism of body temperature raise during HD is heat retention secondary to the compensatory response to loss of plasma volume, resulting in increase of the total peripheral resistance. 2. CD is effective for IDH prevention. 3. ITD is the optimal version of CD. 

  6. Danish risk management plans of the EU Floods Directive

    DEFF Research Database (Denmark)

    Jebens, Martin; Sørensen, Carlo Sass; Piontkowitz, Thorsten

    2016-01-01

    We evaluate the impact and effect of the EU Flood’s Directive (2007/60/EC) in Denmark and the flood risk management plans that are the result of the national implementation. In a qualitative research approach, the flood risk management plans published by 22 Danish municipalities are reviewed...... and analyzed regarding main objectives and structural and non-structural mitigation measures. From the analyses conclusions are drawn on the non-structural risk management measures still to be improved to obtain the full benefits from the Directive. Conclusions point to the need of introducing better decision...

  7. Strategy plan for management of Hanford tank wastes

    International Nuclear Information System (INIS)

    Humphreys, L.L.; Morgan, S.R.

    1993-01-01

    The Secretary of Energy in 1992 directed Hanford to plan for the retrieval and processing of all stored high level waste at Hanford for disposal at an offsite repository. This substantial change in the tank disposal program's assignment has resulted in a reevaluation of the entire Tank Waste Remediation System (TWRS) strategy. This strategic plan covers that portion of the TWRS strategy related to management of stored tank waste until it is retrieved, processed, and disposed by the disposal program and covers the responsibilities assigned to the ''manage tank waste'' function. The ''manage tank waste'' function is one of the level 2 functions as set forth in the Tank Waste Remediation System Mission Analysis Report (Baynes et al. 1993) and depicted in Figure 1. The following level 3 functions have been developed below the level 2, ''manage tank waste'' function: (1) Store waste; (2) Transfer waste; (3) Characterize, surveil and monitor waste; (4) Restore and upgrade systems; (5) Manage tank waste management system

  8. 49 CFR 633.25 - Contents of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  9. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  10. The disaster prevention awareness of foreign residents and disaster management of organizations for foreign employees

    Science.gov (United States)

    Xin, Tan Yen; Sugiki, Nao; Matsuo, Kojiro

    2017-10-01

    Japan is known to have many natural disasters occurrences, especially in recent years, the seismic hazard named "Nankai-trough Disastrous Earthquake" of magnitude 9(M) was predicted and will have caused huge damages. Therefore, disaster management should be well planned and executed to ensure minimal amount of victims and damages from disaster. However, foreign residents are mostly vulnerable and ill-equipped to face such consequences compared to Japanese residents, especially when there is limited information available for foreigners presently. As the influx of foreigner migration has been steadily increasing annually, it is vital for disaster management to be compulsively planned to cope up with the great variety of foreigners' needs from diverse backgrounds accordingly. The purpose of this study is to comprehend foreign residents' disaster prevention awareness, in order to provide a more effective information provision on disaster management, so as to help improve their disaster prevention awareness. Thus, this study is set in Toyohashi city, and the methodology used is by conducting two questionnaires. Firstly, to have an accurate understanding on the awareness of foreign residents towards disasters prevention, the questionnaire is conducted towards foreign university students, on pertinent issues such as on the degree of preparedness and their matters of concern of which is related to natural disasters. Secondly, to comprehend disaster management of organizations, the other focuses on preventive measures adopted by manufacturing industry organizations, such as types of preventive measures as a whole and on the issues and challenges encountered during foreign employee-related enforcement of disaster management. Finally, based both results of the questionnaire, the key factors on effective information provision of disaster management is considered.

  11. Management Planning Requirements for Implementing Office Automation.

    Science.gov (United States)

    McDole, Thomas L.

    To be successful in implementing office automation, office managers must consider more than the obvious question of which system to purchase. They must consider whether automation of their particular office and operations will yield benefits of a significant magnitude to warrant the expense of money, time, and energy needed to install and operate…

  12. An integrative methodological framework for sustainable environmental planning and management

    Science.gov (United States)

    Armitage, Derek

    1995-07-01

    Sustainable environmental planning and management require effective integration of ecological, socioeconomic, and institutional elements. This paper presents an integrative methodological framework for sustainable environmental planning and management. The development of this integrative framework is accomplished by combining two complementary analytical approaches—Hufschmidt's conceptual framework for watershed planning and management and the ABC resource survey method. The combined methodological framework seeks to delineate and synthesize essential ecological information utilizing an integrative resource survey method. This method generates classifications of environmental significance and constraint. Areas of environmental significance and constraint are then linked to appropriate and acceptable resource management actions, implementation tools (e.g., education, technical assistance), and institutional and organizational arrangements. The integrative methodological framework was developed for application in the Rio Fortuna watershed in Costa Rica's Arenal Conservation Area. The watershed is characterized by a variety of land and resource uses, including biologically diverse and ecologically fragile protected areas, small-parcel agriculture, cattle ranching, and tourism.

  13. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  14. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  15. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective

    OpenAIRE

    T?rkay, Metin; Sara?o?lu, ?zt?rk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor us...

  16. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  17. Preventing Medication Error Based on Knowledge Management Against Adverse Event

    OpenAIRE

    Hastuti, Apriyani Puji; Nursalam, Nursalam; Triharini, Mira

    2017-01-01

    Introductions: Medication error is one of many types of errors that could decrease the quality and safety of healthcare. Increasing number of adverse events (AE) reflects the number of medication errors. This study aimed to develop a model of medication error prevention based on knowledge management. This model is expected to improve knowledge and skill of nurses to prevent medication error which is characterized by the decrease of adverse events (AE). Methods: This study consisted of two sta...

  18. 78 FR 19523 - General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation...

    Science.gov (United States)

    2013-04-01

    ... Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation Area and Alibates... Management Plan, Lake Meredith National Recreation Area and Alibates Flint Quarries National Monument, Texas... management alternatives for Lake Meredith National Recreation Area and three management alternatives for...

  19. The Preventive Signaling Maintenance Crew Scheduling Problem for European Railway Traffic Management system (ERTMS)

    DEFF Research Database (Denmark)

    M. Pour, Shahrzad; Stidsen, Thomas Jacob Riis; Rasmussen, Kourosh Marjani

    , the western part of Denmark. This case is particularly interesting, since the entire railway signalling system is currently being upgraded to the new European Railway Traffic Management System (ERTMS) standard. The new signals need continuous maintenance and in this article we plan the distribution of crew......A railway system is a large and complex infrastructure, which requires continuous maintenance in order to function correctly. Proper maintenance is critical but can also be costly. In this paper we consider the practical case of planning the preventive maintenance of railway signals in Jutland...

  20. National Waste Terminal Storage Program: configuration management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Purpose of the Configuration Management Plan is to provide the management discipline through which the integrity and continuity of program cost and schedule trade-off decisions which are made concerning the site selections and facilities performance, producibility, operability and supportability are recorded, communicated, and controlled by the Office of Waste Isolation

  1. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  2. Double Shell Tanks (DST) and Waste Feed Delivery Project Management Quality Affecting Procedures Management Plan

    International Nuclear Information System (INIS)

    LUND, D.P.

    2000-01-01

    The purpose of the Double Shell Tanks (DST) and Waste Feed Delivery (WFD) Management Assessment Plan is to define how management assessments within DST h WFD will be conducted. The plan as written currently includes only WFD Project assessment topics. Other DST and WFD group assessment topics will be added in future revisions

  3. CONFLICT MANAGEMENT VIA SYSTEMICALLY PLANNED PEER MEDIATION

    OpenAIRE

    Evangelos C. Papakitsos; Konstantinos Karakiozis

    2016-01-01

    Conflicts and confrontations between students are a key-feature of school life. Especially in recent years, both the scientific and the educational community are particularly sensitive to bullying issues in the school context. Peer mediation (or school mediation) is an alternative way to manage conflicts at school. A critical evaluation of this practice is attempted, as well as its contribution to the formation of a positive attitude in school and to the decreasing of school-bullying incident...

  4. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control

  5. State planning council on radioactive waste management

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This report contains the findings and policy resolutions resulting from the Council's meeting. The texts of policy resolutions on radioactive waste transport, spent fuel storage, and high-level radioactive waste disposal test facilities are included. A draft legislation statement is presented in support of the establishment of a clear national policy for high-level radioactive waste disposal and management. A status report containing a summary of regional activities in the field of low-level radioactive wastes is presented

  6. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  7. Pandemic planning as risk management: how fared the Australian federation?

    Science.gov (United States)

    Carney, Terry; Bailey, Richard; Bennett, Belinda

    2012-03-01

    The role of law in managing public health challenges such as influenza pandemics poses special challenges. This article reviews Australian plans in the context of the H1N1 09 experience to assess whether risk management was facilitated or inhibited by the "number" of levels or phases of management, the degree of prescriptive detail for particular phases, the number of plans, the clarity of the relationship between them, and the role of the media. Despite differences in the content and form of the plans at the time of the H1N1 09 emerging pandemic, the article argues that in practice, the plans proved to be responsive and robust bases for managing pandemic risks. It is suggested that this was because the plans proved to be frameworks for coordination rather than prescriptive straitjackets, to be only one component of the regulatory response, and to offer the varied tool box of possible responses, as called for by the theory of responsive regulation. Consistent with the principle of subsidiarity, it is argued that the plans did not inhibit localised responses such as selective school closures or rapid responses to selected populations such as cruise ship passengers.

  8. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  9. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning...-oriented planning related to properties with known or suspected environmental contamination. However, costs...

  10. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...

  11. TECHNIQUE OF OPTIMAL AUDIT PLANNING FOR INFORMATION SECURITY MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    F. N. Shago

    2014-03-01

    Full Text Available Complication of information security management systems leads to the necessity of improving the scientific and methodological apparatus for these systems auditing. Planning is an important and determining part of information security management systems auditing. Efficiency of audit will be defined by the relation of the reached quality indicators to the spent resources. Thus, there is an important and urgent task of developing methods and techniques for optimization of the audit planning, making it possible to increase its effectiveness. The proposed technique gives the possibility to implement optimal distribution for planning time and material resources on audit stages on the basis of dynamics model for the ISMS quality. Special feature of the proposed approach is the usage of a priori data as well as a posteriori data for the initial audit planning, and also the plan adjustment after each audit event. This gives the possibility to optimize the usage of audit resources in accordance with the selected criteria. Application examples of the technique are given while planning audit information security management system of the organization. The result of computational experiment based on the proposed technique showed that the time (cost audit costs can be reduced by 10-15% and, consequently, quality assessments obtained through audit resources allocation can be improved with respect to well-known methods of audit planning.

  12. Achieving multiple compliance objectives through a storm water pollution prevention plan

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, K.J.; Cataldo, R. [ENSR, Acton, MA (United States)

    1997-09-01

    All across the US, facility managers and environmental staff are trying to keep up with proliferating regulations and associated filing and reporting requirements. Added to the already full plate of regulations is the National Pollutant Discharge Elimination System (NPDES) program for storm water management. The NPDES program requires a permit for the discharge of runoff from facilities based on Standard Industrial Classification (SIC) code. Some businesses do not yet need to comply with NPDES, as not all types of facilities were included in the Phase 1 list of regulated activities (September 1992). However, most businesses will be included as part of Phase 2 by 2002. Furthermore, states adopting administration of the NPDES program have the option of accelerating the process. In addition to filing for a permit, the NPDES storm water program requires the preparation and implementation of a Storm Water Pollution Prevention Plan (SWPPP). A properly prepared SWPPP can help facilities more easily comply with regulatory requirements and serve as an overall facility management tool.

  13. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable

  14. Stormwater Pollution Prevention Plan TA-60 Roads and Grounds Facility and Associated Sigma Mesa Staging Area

    Energy Technology Data Exchange (ETDEWEB)

    Sandoval, Leonard Frank [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-02-01

    This Stormwater Pollution Prevention Plan (SWPPP) is applicable to operations at the Technical Area -60 (TA-60) Roads and Grounds Facility and Associated Sigma Mesa Staging Area off Eniwetok Drive, in Los Alamos County, New Mexico.

  15. 76 FR 34630 - Approval and Promulgation of Implementation Plans; New Hampshire: Prevention of Significant...

    Science.gov (United States)

    2011-06-14

    ... Promulgation of Implementation Plans; New Hampshire: Prevention of Significant Deterioration; Greenhouse Gas... Deterioration (PSD) program to establish appropriate emission thresholds for determining which new stationary... Protection Agency, EPA New England Regional Office, Office of Ecosystem Protection, 5 Post Office Square...

  16. Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations

  17. Health Promotion Interventions for Low-Income Californians Through Medi-Cal Managed Care Plans, 2012.

    Science.gov (United States)

    Backman, Desiree R; Kohatsu, Neal D; Paciotti, Brian M; Byrne, Jennifer V; Kizer, Kenneth W

    2015-11-12

    Prevention is the most cost-effective approach to promote population health, yet little is known about the delivery of health promotion interventions in the nation's largest Medicaid program, Medi-Cal. The purpose of this study was to inventory health promotion interventions delivered through Medi-Cal Managed Care Plans; identify attributes of the interventions that plans judged to have the greatest impact on their members; and determine the extent to which the plans refer members to community assistance programs and sponsor health-promoting community activities. The lead health educator from each managed care plan was asked to complete a 190-item online survey in January 2013; 20 of 21 managed care plans responded. Survey data on the health promotion interventions with the greatest impact were grouped according to intervention attributes and measures of effectiveness; quantitative data were analyzed using descriptive statistics. Health promotion interventions judged to have the greatest impact on Medi-Cal members were delivered in various ways; educational materials, one-on-one education, and group classes were delivered most frequently. Behavior change, knowledge gain, and improved disease management were cited most often as measures of effectiveness. Across all interventions, median educational hours were limited (2.4 h), and median Medi-Cal member participation was low (265 members per intervention). Most interventions with greatest impact (120 of 137 [88%]) focused on tertiary prevention. There were mixed results in referring members to community assistance programs and investing in community activities. Managed care plans have many opportunities to more effectively deliver health promotion interventions. Establishing measurable, evidence-based, consensus standards for such programs could facilitate improved delivery of these services.

  18. Application of preventive maintenance planning in a parquet ...

    African Journals Online (AJOL)

    STORAGESEVER

    2009-04-20

    Apr 20, 2009 ... extend the equipment life are lubrication, cleaning, ad- justing, and minor component replacement (Tomlingson,. 1993). This is realized based on a plan drawn up so as to decrease breakdown frequency (Karaoglan et al., 2007). In which maintenance times the machines will be maintained by pausing them ...

  19. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  20. Application of preventive maintenance planning in a parquet ...

    African Journals Online (AJOL)

    In this study, the process of a parquet enterprise's transition to preventive maintenance which has been implementing maintenance technique in case of breakdown was investigated. During that transition process, follow up forms for maintenance–repair, breakdown and spare parts were prepared and the implementation ...

  1. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  2. Quality assurance management plan special analytical support

    Energy Technology Data Exchange (ETDEWEB)

    Myers, M.L.

    1997-01-30

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy (DOE), WDOE or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

  3. Savannah River Waste Management Program Plan - FY 1982

    International Nuclear Information System (INIS)

    1981-12-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1982. In addition, the document projects activities for several years beyond 1982 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of October 1, 1981

  4. Danish risk management plans of the EU floods directive

    DEFF Research Database (Denmark)

    Sørensen, Carlo Sass; Jebens, Martin; Piontkowitz, Thorsten

    2017-01-01

    The paper evaluates the impact and effect of the EU Flood's Directive (2007/60/EC) in Denmark and the flood risk management plans that are the result of the national implementation in the first plan period (2010-2015). Twenty flood risk management plans have been elaborated and published by the 22...... Danish municipalities included in 10 risk areas appointed due to a risk of floods from rivers, the sea, or both. For the municipal work, the national government has provided hazard, vulnerability, and risk assessments and maps as well as guidelines to fulfil the legal binding of the Directive. The plans...... are reviewed and analysed regarding main objectives and structural and non-structural mitigation measures. Conclusions point to the need of introducing better decision support systems, a need to define acceptable risks, and a need to enhance coordination between municipal and cross-sectorial actors as well...

  5. Energy management information systems - planning manual and tool

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    An Energy Management Information System (EMIS) provides relevant information that makes energy, performance visible to various levels of an organization, enabling individuals and departments to plan, make decisions and take effective action to manage energy. This manual has two objectives: 1. To enable companies to conduct EMIS audits and prepare EMIS implementation plans; 2. To provide companies with the tools to prepare a financial business case for EMIS implementation. This manual consists of four parts: 1. EMIS Audit is theoretical and provides the methodology to be used by outside or in-house engineers and consultants to do a thorough EMIS Audit. 2. Implementation Plan is to help industry do the work themselves. 3. Appendices is to help the user develop an EMIS Audit, gather data and score their company, prepare a conceptual and detailed design, as well as a business and financial plan for implementation.

  6. Data management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.

  7. Oak Ridge National Laboratory Waste Management Plan. Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  8. On Planning and Managing the Preservation of Historical Buildings

    Directory of Open Access Journals (Sweden)

    Č. Jarský

    2003-01-01

    Full Text Available The process of preserving and reconstructing historical buildings poses several specific questions and raises problems which must be solved in the planning and management stage of the building process - from questions of architectural and art-historical significance, via the future purpose of use of the building, links to the surrounding buildings, environmental questions, questions of cost, time analysis, and quality assurance problems. Many of these problems can be solved with the help of a computer model of the course of the rehabilitation and reconstruction of the building created by a construction technology network diagram. The CONTEC integrated project planning, management and quality control system based on these diagrams has been used for bidding, planning and managing the reconstruction process of several significant historical buildings in Prague and other cities.

  9. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-10-22

    ... Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Orange Vale Water District City of Folsom Santa... Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans) are considered...

  10. LAND MANAGEMENT REGULATION AS AN INSTRUMENT FOR PLANNING IN UKRAINE

    Directory of Open Access Journals (Sweden)

    O. Dorosh

    2017-05-01

    Full Text Available The presence of problems in the territorial management of land indicates that the system of state and municipal management does not meet the modern requirements of sustainable (balanced development. The explanation is simple - if the planning of the development of territories of settlements takes place on the basis of approved urban planning documentation (master plans, then the territory of land tenure and land use outside their borders is notfully covered by development of land management documentation. In this regard, the importance of the development and implementation of land management regulations at the practical level as an important land-use planning tool is substantiated. Essential and meaningful signs of the concepts of "urban planning regulations", "land management regulations" for conducting researchesare found. The National Standard defines the concept of urban planning regulations, such as the use of land plots, established within the respective territorial zones and defines the types of preferential and related use of land, the limits of permitted construction, reconstruction of construction objects and is used in the design, construction and subsequent operation of Objects. The draft law of Ukraine "On zoning of land" proposed the definition of land management regulations as approved in accordance with the established procedure text materials, that determine the parameters of the permitted use of land (land use regime and acceptable changes in these parameters. However, this draft law is not harmonized during the 10-year period at the state level, therefore the proposed terms and definitions do not fully comply with modern requirements. Therefore, it is proposed to supplement them with other terms and definitions. Based on the research carried out, the author's definition of land management regulations should be understood as the procedure for land use, which is established within the respective territorial zones, with the

  11. Optical Networks Solutions planning - performances - management

    DEFF Research Database (Denmark)

    Fenger, Christian

    2002-01-01

    are kept optical and not converted into the optical domain. The focus is on the scientific results achieved throughout the Ph.D. period. Five subjects – all increasing the understanding of optical networks – are studied. Static wavelength routed optical networks are studied. Management on terms...... of lightpath allocation and design is considered. By using statistical models (simultaneous analysis of many networks) the correspondence between parameters determining the network topology and the performance of the optical network is found. These dependencies are important knowledge in the process...... of designing a network. It is also seen (statistically) found that the effect of wavelength converters on the performance of static wavelength routed optical networks is negligible. Dynamic wavelength routed optical networks are simulated and analyzed. Manangement of dynamic networks is a more complex task...

  12. Planning and Management of Technology Deployment Center

    International Nuclear Information System (INIS)

    Park, Jae Won; Joo, Po Kook; Kim, Jun Yeon and others

    2005-08-01

    The R and D contents are summarized as follows ; Models were set-up for transferring the developed technologies to the industry and managing technology deployment center to vitalize the commercialization and then the set-up model was tried to apply for transferring technologies for commercialization and to define interfaces between the R and D and industrial applications In this project, new products and processes were developed for promoting the commercialization. Infra-structures were firmly set-up for the venture company promotion and technology deployment developed during executing the proton Engineering frontier Project. Commercialization methodology connection with industrial companies were studied by outside specializing institute. Development of gem-stone coloring and new photo catalyst producing techniques are very high value-adding technologies, therefore, experimental and theoretical R and D were transacted simultaneously to obtain the originality of the technology. The theoretical R and D was committed to a specialist outside

  13. PFP Interface identification and management planning guide; TOPICAL

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required

  14. Knowledge Management Platform in Advanced Product Quality Planning

    Science.gov (United States)

    Chiliban, Bogdan; Baral, Lal Mohan; Kifor, Claudiu

    2014-12-01

    Knowledge is an essential part of organizational competitiveness. This vital resource must be managed correctly within organizations in order to achieve desired performance levels within all undertakings. The process of managing knowledge is a very difficult one due to the illusive nature of the resource itself. Knowledge is stored within every aspect of an organization starting from people and ending with documents and processes. The Knowledge Management Platform is designed as a facilitator for managers and employees in all endeavours knowledge related within the Advanced Product Quality Planning Procedure

  15. When science meets culture: the prevention and management of ...

    African Journals Online (AJOL)

    2013-05-13

    May 13, 2013 ... Review Article: When science meets culture: the prevention and management of erectile dysfunction in the 21st century. 2014;27(1). S Afr J Clin Nutr. Introduction. It is now well recognised ..... Traditional Asian folklore medicines in sexual health. Indian J Urol. 2006;22(3):241-245. 3. Lim PH, Moorthy P, Tan ...

  16. Pattern Of Occurrence, Management And Prevention Of Trauma In ...

    African Journals Online (AJOL)

    OBJECTIVE: The purpose of this paper is to review the occurrence, management and prevention of trauma in industry in Nigeria with particular reference to the oil industry. The type of injuries, their causes and relative frequency in the Nigerian oil industry has been discussed. First aid facilities, evacuation procedures and ...

  17. Risk assessment and management to prevent preterm birth

    NARCIS (Netherlands)

    Koullali, B.; Oudijk, M. A.; Nijman, T. A. J.; Mol, B. W. J.; Pajkrt, E.

    2016-01-01

    Preterm birth is the most important cause of neonatal mortality and morbidity worldwide. In this review, we review potential risk factors associated with preterm birth and the subsequent management to prevent preterm birth in low and high risk women with a singleton or multiple pregnancy. A history

  18. Prevention and management of ventilator-associated pneumonia ...

    African Journals Online (AJOL)

    The Care Bundle approach offers an interventional tool to implement strategies specifically directed to the prevention of VAP and the facilitation of a team approach to improving its clinical management. The evidence available presents a strong argument to consider a team approach to reducing the incidence of VAP in our ...

  19. 76 FR 752 - Approval and Promulgation of Implementation Plans; Connecticut: Prevention of Significant...

    Science.gov (United States)

    2011-01-06

    ... Promulgation of Implementation Plans; Connecticut: Prevention of Significant Deterioration; Greenhouse Gas... changes impacting Connecticut's New Source Review (NSR) Prevention of Significant Deterioration (PSD... Regional Office, Office of Ecosystem Protection, 5 Post Office Square-- Suite 100 (Mail code OEP05-2...

  20. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449 ampersand D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit