WorldWideScience

Sample records for prevent database outages

  1. ALARA database value in future outage work planning and dose management

    International Nuclear Information System (INIS)

    Miller, D.W.; Green, W.H.

    1995-01-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system's ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed

  2. ALARA database value in future outage work planning and dose management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D.W.; Green, W.H. [Clinton Power Station Illinois Power Co., IL (United States)

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.

  3. Outages planning

    International Nuclear Information System (INIS)

    Blanquer, N.

    2010-01-01

    The reason of a nuclear power plant outage seems easy. Replace 1/3 of the total core fuel inside reactor for a new, store the old one in a pool and shuffle the rest 2/3 in other positions in the core to optimize fuel burn up. Also is needed to make the preventive, corrective and conservative maintenance, the selected design changes and the regulatory and technical requirements for equipment and systems. To make the plant outage strategy for all the above pack with nuclear safety not challenged is the objective of this article for the Spanish Nuclear Society magazine. (Author)

  4. Refueling outage data collection and analysis

    International Nuclear Information System (INIS)

    Harshaw, K.; Quilliam, J.; Brinsfield, W.; Jeffries, J.

    1993-07-01

    This report summarizes the results of an EPRI project to compile an industry generic refueling outage database applicable to alternate (non-full-power) modes of shutdown conditions at nuclear power plants. The project team evaluated five outages at two BWR plants. They obtained data primarily from control room logs, outage schedules, incident reports, and licensee event reports. The team organized the data by outage segment and time line. Due to its small sample size, this study produced no conclusive results related to initiating event frequencies, equipment failure rates, or human reliability estimates during shutdown conditions. However, it pointed out the problems of brief or inconsistent recordkeeping. A too brief record results in difficulty determining if the root cause of an event was mechanical or the result of human performance. Retrieval of data can be difficult and labor-intensive. There is a clear need for better, more comprehensive documentation

  5. Outage preparation milestones - A tool to improve planned outage performance

    International Nuclear Information System (INIS)

    Laplatney, Jere; Hwang, Euiyoub

    2006-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depend heavily on the performance of planned outages. Nuclear Power Plants who have successfully undertaken outage optimization projects have demonstrated than an effective Outage Preparation Milestone program is a key component of their improvement programs. This paper will provide background into the field of 'Outage Optimization' including the philosophy, general approach, and results obtained in the U. S. industry. The significant safety improvements afforded by properly implementing outage improvement programs will be explained. Some specific examples of outage improvements will be given including the adoption of a strong Outage Preparation Milestone Program. The paper will then describe the attributes of an effective Outage Preparation Milestone Program and list a set of specific key milestones. The key milestones are defined and the reasons for each are explained. Suggested due dates for each key milestone relative to the outage start date are provided. Successful implementation of an Outage Preparation Milestone program depends heavily upon the management tools and methods used to assure that the organization meets the milestones on time and in a quality fashion. These include methods to handle cases where milestones are not met - either partially or fully. KHNP is investigating implementing an improved Outage Preparation Milestone program for its fleet of reactors as part of its overall program to improve its performance of planned outages

  6. Development and demonstration of techniques for reducing occupational radiation doses during refueling outages. Tasks 7A/7B. Advanced outage management and radiation exposure control

    International Nuclear Information System (INIS)

    1985-03-01

    Objectives of Tasks 7A and 7B were to develop and demonstrate computer based systems to assist plant management and staff in utilizing information more effectively to reduce occupational exposures received as a result of refueling outages, and to shorten the duration of the outage. The Advanced Outage Management (AOM) Tool (Task 7A) is an automated outage planning system specifically designed to meet the needs of nuclear plant outage management. The primary objective of the AOM tool is to provide a computerized system that can manipulate the information typically associated with outage planning and scheduling to furnish reports and schedules that more accurately project the future course of the outage. The Radiation Exposure Control (REC) Tool (Task 7B) is a computerized personnel radiation exposure accounting and management system designed to enable nuclear plant management to project and monitor total personnel radiation exposure on a real-time basis. The two systems were designed to operate on the same computer system and interface through a common database that enables information sharing between plant organizations not typically interfaced. This interfacing provides outage planners with a means of incorporating occupational radiation exposure as a factor for making decisions on the course of an outage

  7. Power Outages

    Science.gov (United States)

    ... Publications Emergency Alerts Preparedness Portal Preparedness Messaging Calendar Social Media Preparedness Toolkits Preparedness News Languages About Us Build a Kit Close Search Enter Search Term(s): Main Content Home Be Informed Power Outages Power Outages Extended power outages may impact ...

  8. Outages planning; Planificacion de recargas

    Energy Technology Data Exchange (ETDEWEB)

    Blanquer, N.

    2010-07-01

    The reason of a nuclear power plant outage seems easy. Replace 1/3 of the total core fuel inside reactor for a new, store the old one in a pool and shuffle the rest 2/3 in other positions in the core to optimize fuel burn up. Also is needed to make the preventive, corrective and conservative maintenance, the selected design changes and the regulatory and technical requirements for equipment and systems. To make the plant outage strategy for all the above pack with nuclear safety not challenged is the objective of this article for the Spanish Nuclear Society magazine. (Author)

  9. Driving for shorter outages

    International Nuclear Information System (INIS)

    Tritch, S.

    1996-01-01

    Nuclear plant outages are necessary to complete activities that cannot be completed during the operating cycle, such as steam generator inspection and testing, refueling, installing modifications, and performing maintenance tests. The time devoted to performing outages is normally the largest contributor to plant unavailability. Similarly, outage costs are a sizable portion of the total plant budget. The scope and quality of work done during outages directly affects operating reliability and the number of unplanned outages. Improved management and planning of outages enhances the margin of safety during the outage and results in increased plant reliability. The detailed planning and in-depth preparation that has become a necessity for driving shorter outage durations has also produced safer outages and improved post-outage reliability. Short outages require both plant and vendor management to focus on all aspects of the outage. Short outage durations, such as 26 days at South Texas or 29 days at North Anna, require power plant inter-department and intra-department teamwork and communication and vendor participation. In this paper shorter and safer outage at the 3-loop plants in the United States are explained. (J.P.N.)

  10. 35/30 outage improvement project

    International Nuclear Information System (INIS)

    Clewett, L.

    2011-01-01

    Outage performance is a significant contributor to the business plan at Bruce Power. A process improvement initiative commenced in 2010-11 to improve outage efficiency and predictability. 12 teams (over 200 people) participated in improvement identification in four areas: Organizational Engagement; Outage Scope; Resources; and, Critical Outage Execution. Out of over 550 initiatives identified, 200 are being incorporated into the Outage Improvement Initiative. Key deliverables include: Development of a long-range 'fleet-level' business strategy to integrate outage duration, outage improvements and unit refurbishments; Development of a 35 day outage schedule template; Determining optimal outage organization to perform outages on an 8-unit site; Improved schedule adherence and productivity; Process to integrate scope needs to support life-cycle and long-range outage needs improvement while meeting near term and regulatory requirements; Consistent methodology in planning of outages to front-end load the high risk work into the outage schedule; Consistent baseline by senior leaders for the expectations of milestone ownership and completion; Consistent framework for milestone compliance and preparation; Communication strategy to educate personnel on the importance of the outage program and nuclear safety, business goals, and budget; and, Suite of metrics based upon industry benchmarks. The Outage Improvement Initiative has a goal of 35 day outages every 30 months. This potentially represents considerable savings to the Bruce Power business plan, both direct revenue savings attributed to reduced outage duration, as well as incremental outage cost savings. Other improvements from the initiative will include personnel radiation exposure and equipment reliability due to decreased outage duration and adherence to scoping, assessing and long lead part milestones. This presentation will describe the outage improvement initiatives to achieve a goal of consistent 35 day outages

  11. 35/30 outage improvement project

    Energy Technology Data Exchange (ETDEWEB)

    Clewett, L. [Bruce Power, Tiverton, Ontario (Canada)

    2011-07-01

    Outage performance is a significant contributor to the business plan at Bruce Power. A process improvement initiative commenced in 2010-11 to improve outage efficiency and predictability. 12 teams (over 200 people) participated in improvement identification in four areas: Organizational Engagement; Outage Scope; Resources; and, Critical Outage Execution. Out of over 550 initiatives identified, 200 are being incorporated into the Outage Improvement Initiative. Key deliverables include: Development of a long-range 'fleet-level' business strategy to integrate outage duration, outage improvements and unit refurbishments; Development of a 35 day outage schedule template; Determining optimal outage organization to perform outages on an 8-unit site; Improved schedule adherence and productivity; Process to integrate scope needs to support life-cycle and long-range outage needs improvement while meeting near term and regulatory requirements; Consistent methodology in planning of outages to front-end load the high risk work into the outage schedule; Consistent baseline by senior leaders for the expectations of milestone ownership and completion; Consistent framework for milestone compliance and preparation; Communication strategy to educate personnel on the importance of the outage program and nuclear safety, business goals, and budget; and, Suite of metrics based upon industry benchmarks. The Outage Improvement Initiative has a goal of 35 day outages every 30 months. This potentially represents considerable savings to the Bruce Power business plan, both direct revenue savings attributed to reduced outage duration, as well as incremental outage cost savings. Other improvements from the initiative will include personnel radiation exposure and equipment reliability due to decreased outage duration and adherence to scoping, assessing and long lead part milestones. This presentation will describe the outage improvement initiatives to achieve a goal of consistent 35 day

  12. A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys

    Energy Technology Data Exchange (ETDEWEB)

    Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

    2003-11-01

    A clear understanding of the monetary value that customers place on reliability and the factors that give rise to higher and lower values is an essential tool in determining investment in the grid. The recent National Transmission Grid Study recognizes the need for this information as one of growing importance for both public and private decision makers. In response, the U.S. Department of Energy has undertaken this study, as a first step toward addressing the current absence of consistent data needed to support better estimates of the economic value of electricity reliability. Twenty-four studies, conducted by eight electric utilities between 1989 and 2002 representing residential and commercial/industrial (small, medium and large) customer groups, were chosen for analysis. The studies cover virtually all of the Southeast, most of the western United States, including California, rural Washington and Oregon, and the Midwest south and east of Chicago. All variables were standardized to a consistent metric and dollar amounts were adjusted to the 2002 CPI. The data were then incorporated into a meta-database in which each outage scenario (e.g., the lost of electric service for one hour on a weekday summer afternoon) is treated as an independent case or record both to permit comparisons between outage characteristics and to increase the statistical power of analysis results. Unadjusted average outage costs and Tobit models that estimate customer damage functions are presented. The customer damage functions express customer outage costs for a given outage scenario and customer class as a function of location, time of day, consumption, and business type. One can use the damage functions to calculate outage costs for specific customer types. For example, using the customer damage functions, the cost experienced by an ''average'' customer resulting from a 1 hour summer afternoon outage is estimated to be approximately $3 for a residential customer, $1

  13. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  14. Outage information system

    International Nuclear Information System (INIS)

    Svengren, Haakan; Meyer, Brita Diskerud

    2005-09-01

    Today's control room systems are designed to operate during power operation, and there is clearly a need for a system to support control room personnel in automatically supervising the status of the plant during the outage period. In order to improve the supervision of Nuclear Power Plants during outages, three prototypes of the Outage Information system have been designed by the Halden Project, one for PWR and two for BWR. The Outage Information System is presented on a large screen, centrally placed in the control room. There will be a PC connected to manage the system. By using signals from the process as input to logic diagrams reflecting the plant's Safety Technical Specifications, the system automatically is supervising that requirements in Safety Technical Specifications are fulfilled during all plant states of the outage period. The system also automatically gives an overview of the status of safety systems and electrical bus bars. Alarm will occur if a requirement in the Safety Technical Specifications is not fulfilled or if a component planned to be ready for operation, is inoperable. In addition, selected measurements being important during the outage period are presented on the large screen. Which measurements and in which way the values will be presented, depends on the plant's control room design and work practice. (Author)

  15. Cycle 7 outage experience

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The scheduled 58-day refueling outage in preparation for the seventh operating cycle of the Fast Flux Test Facility (FFTF) was successfully completed three days ahead of schedule. The planning and execution of the outage was greatly aided by Project/2 automated scheduling capabilities. For example, the use of ''maintenance windows'' and resource loading capabilities was particularly effective. The value of the planning process was demonstrated by the smooth transition into the outage phase after an early shutdown and set the stage for our best outage to date

  16. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  17. Outage planning in Japan

    International Nuclear Information System (INIS)

    Nedderman, John.

    1997-01-01

    Nuclear plant operators in Japan are constrained to keep refuelling and maintenance outages to a minimum by the regulation limiting operating cycles to no longer than 13 months. Outage planning by two contrasting operators is described. Hokkaido Electric, which operates only one plant, Tomari, with two PWRs, plans to reduce outage time from the present 65 days in two stages. Detailed review of previous outage schedules has shown that a reduction to 59 days should be achievable by careful planning without any fundamental changes. The second reduction to 49 days will require such measures as relaxing water purity standards, rescheduling fuel unloading and loading shifts and speeding up eddy current testing of primary equipment by using steam generator nozzle dams. Kansai Electric, operating 11 PWRs at three plants, has scope for reducing outages at all of its units using a range of measures. Steam generator replacement in the seven oldest reactors, completed in July 1997, is by far the most significant of these and is expected to save 64 days repair time in a previous average outage time of 131 days. (UK)

  18. Benchmark Report on Key Outage Attributes: An Analysis of Outage Improvement Opportunities and Priorities

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Laboratory (INL), Idaho Falls, ID (United States)

    2014-09-01

    Advanced Outage Control Center (AOCC), is a multi-year pilot project targeted at Nuclear Power Plant (NPP) outage improvement. The purpose of this pilot project is to improve management of NPP outages through the development of an AOCC that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report documents the results of a benchmarking effort to evaluate the transferability of technologies demonstrated at Idaho National Laboratory and the primary pilot project partner, Palo Verde Nuclear Generating Station. The initial assumption for this pilot project was that NPPs generally do not take advantage of advanced technology to support outage management activities. Several researchers involved in this pilot project have commercial NPP experience and believed that very little technology has been applied towards outage communication and collaboration. To verify that the technology options researched and demonstrated through this pilot project would in fact have broad application for the US commercial nuclear fleet, and to look for additional outage management best practices, LWRS program researchers visited several additional nuclear facilities.

  19. Diablo Canyon refueling outage program

    International Nuclear Information System (INIS)

    McLane, W.B.; Irving, T.L.

    1991-01-01

    Management of outages has become one of the most talked about subjects in the nuclear power industry in the past several years. Many utilities do not perform refueling outages very well or in the past have had some outages that they would not like to repeat and in some cases do not even like to think about. With the growing cost of energy and the demands placed on utilities to improve capacity factors, it is very easy for management to focus on shortening refueling outage durations as a prime objective in improving overall corporate performance. So it is with Pacific Gas and Electric Company and the Diablo Canyon power plant. A review of their refueling outage performance reflects a utility that is responding to the nuclear industry's call for improved outage performance

  20. Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    Shawn St. Germain; Ronald Farris; Heather Medeman

    2013-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near

  1. Nuclear power plant outage optimisation strategy

    International Nuclear Information System (INIS)

    2002-10-01

    Competitive environment for electricity generation has significant implications for nuclear power plant operations, including among others the need of efficient use of resources, effective management of plant activities such as on-line maintenance and outages. Nuclear power plant outage management is a key factor for good, safe and economic nuclear power plant performance which involves many aspects: plant policy, co-ordination of available resources, nuclear safety, regulatory and technical requirements and, all activities and work hazards, before and during the outage. This technical publication aims to communicate these practices in a way they can be used by operators and utilities in the Member States of the IAEA. It intends to give guidance to outage managers, operating staff and to the local industry on planning aspects, as well as examples and strategies experienced from current plants in operation on the optimization of outage period. This report discusses the plant outage strategy and how this strategy is actually implemented. The main areas identified as most important for outage optimization by the utilities and government organizations participating in this report are: organization and management; outage planning and preparation, outage execution, safety outage review, and counter measures to avoid extension of outages and to easier the work in forced outages. This report was based on discussions and findings by the authors of the annexes and the participants of an Advisory Group Meeting on Determinant Causes for Reducing Outage Duration held in June 1999 in Vienna. The report presents the consensus of these experts regarding best common or individual good practices that can be used at nuclear power plants with the aim to optimize

  2. Reliabilty worth: Development of a relationship with outage magnitude, duration and frequency

    International Nuclear Information System (INIS)

    Turner, F.P.P.; Katrichak, A.M.; Dwyer, A.; Edwards, D.; Ibrahim, A.

    1994-01-01

    British Columbia Hydro's Worth Project Team was founded to determine values for reliability for reference in evaluation of investment and operating decisions. Work to date has produced key preliminary values for specific outages and concepts for the shape of the relationship between value and these determinates of reliability worth, frequency, magnitude and duration. These values and concepts are described. The values are developed through an iterative, trial and refinement approach. The approach incorporates direct input from customers, common sense and judgement, and micro- and macro-economic concepts. Reliability worth values for reduced or prevented outages are presented for residential, commercial, small industrial and mixed sectors and various outage durations. Reliability worth values were obtained through customer surveys. Limitations of the reliability worth value are numerous and are listed. Study of cost vs magnitude of interruption using microeconomic models has shown that costly system improvements to reduce the possibility of widespread outages may not be justified. The case of exceptionally large area outages (blackouts) is examined. The cost vs frequency relationship was examined in terms of the economic concept of utility or satisfaction. Different loss/frequency characteristics are demonstrated for different customer classes. Customer value for reduced outage duration is expressed in a curve with flatter slope than that for eliminated outages. 2 refs., 6 figs

  3. Outage reduction of Hamaoka NPS

    International Nuclear Information System (INIS)

    Hida, Shigeru; Anma, Minoru

    1999-01-01

    In the Hamaoka nuclear power plant, we have worked on the outage reduction since 1993. In those days, the outage length in Hamaoka was 80 days or more, and was largely far apart from excellent results of European and American plants about the 30days. A concrete strategy to achieve the reduction process is the extension of working hours, the changing work schedule control unit for every hour, the equipment improvements, and the improvements of work environments, etc. We executed them one by one reflecting results. As a result, we achieved the outage for 57 days in 1995. Starting from this, we acquired the further outage reduction one by one and achieved the outage for 38 days in 1997 while maintaining safety and reliability of the plant. We advance these strategies further and we will aim at the achievement of the 30·35 days outage in the future. (author)

  4. Outage optimization - the US experience and approach

    International Nuclear Information System (INIS)

    LaPlatney, J.

    2007-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depends heavily on the performance of planned outages. Some reactor fleets, for example Finland and Germany, have demonstrated sustained good outage performance from their start of commercial operation. Others, such as the US, have improved performance over time. The principles behind a successful outage optimization process are: -) duration is not sole measure of outage success, -) outage work must be performed safely, -) scope selection must focus on improving plant material condition to improve reliability, -) all approved outage work must be completed, -) work must be done cost effectively, -) post-outage plant reliability is a key measure of outage success, and -) outage lessons learned must be effectively implemented to achieve continuous improvement. This approach has proven its superiority over simple outage shortening, and has yielded good results in the US fleet over the past 15 years

  5. Nuclear Plant Integrated Outage Management

    International Nuclear Information System (INIS)

    Gerstberger, C. R.; Coulehan, R. J.; Tench, W. A.

    1992-01-01

    This paper is a discussion of an emerging concept for improving nuclear plant outage performance - integrated outage management. The paper begins with an explanation of what the concept encompasses, including a scope definition of the service and descriptions of the organization structure, various team functions, and vendor/customer relationships. The evolvement of traditional base scope services to the integrated outage concept is addressed and includes discussions on changing customer needs, shared risks, and a partnership approach to outages. Experiences with concept implementation from a single service in 1984 to the current volume of integrated outage management presented in this paper. We at Westinghouse believe that the operators of nuclear power plants will continue to be aggressively challenged in the next decade to improve the operating and financial performance of their units. More and more customers in the U. S. are looking towards integrated outage as the way to meet these challenges of the 1990s, an arrangement that is best implemented through a long-term partnering with a single-source supplier of high quality nuclear and turbine generator outage services. This availability, and other important parameters

  6. Outage management philosophies at Oconee nuclear station

    International Nuclear Information System (INIS)

    Bond, R.T.

    1991-01-01

    At Oconee the biggest single factor in improving availability and cutting cost per kilowatt-hour is reducing outage lengths. This must be accomplished without compromising the quality of the work that must be performed during these outages. Oconee has completed 35 refueling outages and has gained considerable experience in outage management. Since 1984, outage costs and durations have consistently been reduced while continuing to improve capacity factors. The last 6 refueling outages were 43, 42, 45, 42, 41, and 44 days, respectively. The capacity factors for these units between refueling outages are 98, 94, 96, 98, and 98%, respectively. The average cost of outages has been less than $12 million. It is believed that success cannot be attributed to any one factor by itself but is a compilation of many factors, all complementing each other. It is also believed, however, that there are four key areas that represent philosophies and can be given most of the credit for successful outages: planning, experience, teamwork, and outage management

  7. Management techniques that keep outages on schedule

    International Nuclear Information System (INIS)

    Taylor, R.B.

    1987-01-01

    During the immature operation of the Pickering Units 5 through 8, significant numbers of outages have been required to deal with warranty inspections and equipment problems. Techniques have been developed to ensure that outages are properly planned and managed so that outage time is minimized, overtime is minimized, and capacity factor is maximized, while ensuring that personnel safety is not compromised. Successful outage planning and execution requires the commitment of many on-station and off-station resources groups. Coordination of all of these groups is required both before and during the outage to ensure outage time is not lost due to unavailability of men or equipment at the time they are required. This paper details the control processes that must be used prior to, during, and after an outage to ensure that time is not lost unnecessarily during outages. Successful outage management at Pickering Nuclear Generating Station can be subdivided into three stages; preoutage planning, outage execution, and postoutage review

  8. Integrated outage management: Leveraging utility system assets including GIS and AMR for optimum outage response

    Energy Technology Data Exchange (ETDEWEB)

    Finamore, E. P.

    2004-02-01

    The control of electrical system outages is discussed. The principal argument advanced is that traditional stand-alone methods of outage response will no longer get the job done without utility companies integrating their outage management systems with other system assets such as GIS (geographic information system) and AMR (advanced metering systems). Many meter reading systems, while primarily supporting customer billing, can also provide outage alarm and some are also capable of service restoration notification, which is an invaluable benefit to service operators since it obviates the need for verifying system restoration by labour-intensive on-site visits or customer call-backs. If successfully leveraged, optimization of all utility assets and improvements in labour productivity can results in improved outage management performance gains without affecting performance in other areas.

  9. Nuclear power plant outages

    International Nuclear Information System (INIS)

    1998-01-01

    The Finnish Radiation and Nuclear Safety Authority (STUK) controls nuclear power plant safety in Finland. In addition to controlling the design, construction and operation of nuclear power plants, STUK also controls refuelling and repair outages at the plants. According to section 9 of the Nuclear Energy Act (990/87), it shall be the licence-holder's obligation to ensure the safety of the use of nuclear energy. Requirements applicable to the licence-holder as regards the assurance of outage safety are presented in this guide. STUK's regulatory control activities pertaining to outages are also described

  10. Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

    Energy Technology Data Exchange (ETDEWEB)

    Gregory Weatherby

    2012-05-01

    The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage

  11. Nuclear Power Plant Outage Optimization Strategy. 2016 Edition

    International Nuclear Information System (INIS)

    2016-10-01

    This publication is an update of IAEA-TECDOC-1315, Nuclear Power Plant Outage Optimisation Strategy, which was published in 2002, and aims to communicate good outage management practices in a manner that can be used by operators and utilities in Member States. Nuclear power plant outage management is a key factor for safe and economic nuclear power plant performance. This publication discusses plant outage strategy and how this strategy is actually implemented. The main areas that are important for outage optimization that were identified by the utilities and government organizations participating in this report are: 1) organization and management; 2) outage planning and preparation; 3) outage execution; 4) safety outage review; and 5) counter measures to avoid the extension of outages and to facilitate the work in forced outages. Good outage management practices cover many different areas of work and this publication aims to communicate these good practices in a way that they can be used effectively by operators and utilities

  12. Distributed power-line outage detection based on wide area measurement system.

    Science.gov (United States)

    Zhao, Liang; Song, Wen-Zhan

    2014-07-21

    In modern power grids, the fast and reliable detection of power-line outages is an important functionality, which prevents cascading failures and facilitates an accurate state estimation to monitor the real-time conditions of the grids. However, most of the existing approaches for outage detection suffer from two drawbacks, namely: (i) high computational complexity; and (ii) relying on a centralized means of implementation. The high computational complexity limits the practical usage of outage detection only for the case of single-line or double-line outages. Meanwhile, the centralized means of implementation raises security and privacy issues. Considering these drawbacks, the present paper proposes a distributed framework, which carries out in-network information processing and only shares estimates on boundaries with the neighboring control areas. This novel framework relies on a convex-relaxed formulation of the line outage detection problem and leverages the alternating direction method of multipliers (ADMM) for its distributed solution. The proposed framework invokes a low computational complexity, requiring only linear and simple matrix-vector operations. We also extend this framework to incorporate the sparse property of the measurement matrix and employ the LSQRalgorithm to enable a warm start, which further accelerates the algorithm. Analysis and simulation tests validate the correctness and effectiveness of the proposed approaches.

  13. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    Energy Technology Data Exchange (ETDEWEB)

    St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald Keith [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications

  14. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    International Nuclear Information System (INIS)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    2015-01-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications

  15. Review of Paks outage results 1990

    International Nuclear Information System (INIS)

    Lukacs, P.; Zsoldos, F.; Kiss, Z.

    1991-01-01

    The year 1990 was not the most successful from an outage point of view at the Paks Nuclear Power Plant in Hungary -there were one or two long delays. Work at unit 4 had a delay of 10 days because of an error made during assembling the reactor vessel. While the outage of unit 3 was running, a feedwater pipe hanger problem was discovered - several hangers were found displaced from the right position. A general inspection of the affected system was required and this took about 11 days. Information about each outage is presented on diagrams, making comparison easier. These diagrams give information about deviations from the outage plan, about work hours performed during outages, and about collective exposure. (author)

  16. Cost of Lightning Strike Related Outages of Visual Navigational Aids at Airports in the United States

    Science.gov (United States)

    Rakas, J.; Nikolic, M.; Bauranov, A.

    2017-12-01

    Lightning storms are a serious hazard that can cause damage to vital human infrastructure. In aviation, lightning strikes cause outages to air traffic control equipment and facilities that result in major disruptions in the network, causing delays and financial costs measured in the millions of dollars. Failure of critical systems, such as Visual Navigational Aids (Visual NAVAIDS), are particularly dangerous since NAVAIDS are an essential part of landing procedures. Precision instrument approach, an operation utilized during the poor visibility conditions, utilizes several of these systems, and their failure leads to holding patterns and ultimately diversions to other airports. These disruptions lead to both ground and airborne delay. Accurate prediction of these outages and their costs is a key prerequisite for successful investment planning. The air traffic management and control sector need accurate information to successfully plan maintenance and develop a more robust system under the threat of increasing lightning rates. To analyze the issue, we couple the Remote Monitoring and Logging System (RMLS) database and the Aviation System Performance Metrics (ASPM) databases to identify lightning-induced outages, and connect them with weather conditions, demand and landing runway to calculate the total delays induced by the outages, as well as the number of cancellations and diversions. The costs are then determined by calculating direct costs to aircraft operators and costs of passengers' time for delays, cancellations and diversions. The results indicate that 1) not all NAVAIDS are created equal, and 2) outside conditions matter. The cost of an outage depends on the importance of the failed system and the conditions that prevailed before, during and after the failure. The outage that occurs during high demand and poor weather conditions is more likely to result in more delays and higher costs.

  17. Outages 1999 and 2000, investments in safety and long-term operation of NE Krsko

    International Nuclear Information System (INIS)

    Sirola, P.; Krajnc, J.; Androjna, F.

    1999-01-01

    Plant outage is an important part of nuclear power plant operation. During that time the conditions are established for the performance of specific activities, such as refueling, tests, inspections, preventive and corrective maintenance and modifications, that are intended to confirm proper condition and availability of safety and other important components and improve overall plant safety and reliability. It is well know that in Nuclear Power Plant Krsko (Nuklearna elektrarna Krsko NEK) during Outage 2000 new Steam Generators (SGs) will be placed in service, while Outage '99 was used for preparatory works. But the importance of those two outages is even greater, because they are implementing a broad number of improvements and establishing a basis for long-term plant operation. Outage '99 required very detailed planning to assure a good control over the outage activities and operational plant systems necessary for safe shutdown. Numerous activities took place in a relatively narrow space in the Reactor Building. Some of these activities will have a big significance for the future. The article treats the status update and summarizes the specifics and importance of the mentioned activities to long-term plant safe and reliable operation.(author)

  18. Guidelines for Implementation of an Advanced Outage Control Center to Improve Outage Coordination, Problem Resolution, and Outage Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    St. Germain, Shawn W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald K. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whaley, April M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Medema, Heather D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gertman, David I. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear power plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

  19. Framatome ANP outage optimization support solutions

    International Nuclear Information System (INIS)

    Bombail, Jean Paul

    2003-01-01

    Over the last several years, leading plant operators have demonstrated that availability factors can be improved while safety and reliability can be enhanced on a long-term basis and operating costs reduced. Outage optimization is the new term being used to describe these long-term initiatives through which a variety of measures aimed at shortening scheduled plant outages have been developed and successfully implemented by these leaders working with their service providers who were introducing new technologies and process improvements. Following the leaders, all operators now have ambitious outage optimization plans and the median and average outage duration are decreasing world-wide. Future objectives are even more stringent and must include plant upgrades and component replacements being performed for life extension of plant operation. Outage optimization covers a broad range of activities from modifications of plant systems to faster cool down rates to human behavior improvements. It has been proven to reduce costs, avoid unplanned outages and thus support plant availability and help to ensure the utility's competitive position in the marketplace

  20. Management strategies for nuclear power plant outages

    International Nuclear Information System (INIS)

    2006-01-01

    More competitive energy markets have significant implications for nuclear power plant operations, including, among others, the need for more efficient use of resources and effective management of plant activities such as on-line maintenance and outages. Outage management is a key factor for safe, reliable and economic plant performance and involves many aspects: plant policy, coordination of available resources, nuclear safety, regulatory and technical requirements, and all activities and work hazards, before and during the outage. The IAEA has produced this report on nuclear power plant outage management strategies to provide both a summary and an update of a follow-up to a series of technical documents related to practices regarding outage management and cost effective maintenance. The aim of this publication is to identify good practices in outage management: outage planning and preparation, outage execution and post-outage review. As in in the related technical documents, this report aims to communicate these practices in such a way that they can be used by operating organizations and regulatory bodies in Member States. The report was prepared as part of an IAEA project on continuous process improvement. The objective of this project is to increase Member State capabilities in improving plant performance and competitiveness through the utilization of proven engineering and management practices developed and transferred by the IAEA

  1. Study of Arkansas Nuclear One-1 13th refueling outage

    International Nuclear Information System (INIS)

    Hashiba, Takashi

    1997-01-01

    Recently performance of nuclear power plants in the USA has improved remarkably. Their average automatic shutdown rate has been sharply dropping, although it is still higher than that in Japan, and their average capacity factor has become higher than that in Japan in recent years. One of the main contributors is an extension of the operational period, and another is a shortening of refueling-outage time. It is considerably difficult to have accomplished both the improvement of plant reliability and shortening of refueling-outage time because their refueling outage corresponds to our periodical inspection which is central to maintenance activities in Japanese plants. In order to learn how they have been achieved, a visit to Arkansas Nuclear One-1 (ANO-1) which obtained the top-class result of SALP (Systematic Assessment of Licensee Performance) performed by the Nuclear Regulatory Commission was planned and study of their 13th refueling outage was carried out. Their achievements result from performance-base maintenance and on-line maintenance, based on a proper preventive maintenance program, and untiring efforts of efficiency improvement, represented by the introduction of several on-line systems. And the reason behind this is severe competition concerning power generation cost reduction. (author)

  2. Study of Arkansas Nuclear One-1 13th refueling outage

    Energy Technology Data Exchange (ETDEWEB)

    Hashiba, Takashi [Institute of Nuclear Safety System Inc., Seika, Kyoto (Japan)

    1997-09-01

    Recently performance of nuclear power plants in the USA has improved remarkably. Their average automatic shutdown rate has been sharply dropping, although it is still higher than that in Japan, and their average capacity factor has become higher than that in Japan in recent years. One of the main contributors is an extension of the operational period, and another is a shortening of refueling-outage time. It is considerably difficult to have accomplished both the improvement of plant reliability and shortening of refueling-outage time because their refueling outage corresponds to our periodical inspection which is central to maintenance activities in Japanese plants. In order to learn how they have been achieved, a visit to Arkansas Nuclear One-1 (ANO-1) which obtained the top-class result of SALP (Systematic Assessment of Licensee Performance) performed by the Nuclear Regulatory Commission was planned and study of their 13th refueling outage was carried out. Their achievements result from performance-base maintenance and on-line maintenance, based on a proper preventive maintenance program, and untiring efforts of efficiency improvement, represented by the introduction of several on-line systems. And the reason behind this is severe competition concerning power generation cost reduction. (author)

  3. Outage risk reduction at Diablo Canyon

    International Nuclear Information System (INIS)

    Burnett, Tobias W.T.; Eugene Newman, C.

    2004-01-01

    A formal risk reduction program was conducted at the Diablo Canyon Nuclear Generating plant as part of EPRI's Outage Risk Assessment and Management Program. The program began with a probabilistic and deterministic assessment of the frequency of core coolant boiling and core uncovery during shutdown operations. This step identified important contributors to risk, periods of high vulnerability, and potential mechanisms for reducing risk. Next, recovery strategies were evaluated and procedures, training, and outage schedules modified. Twelve risk reduction enhancements were developed and implemented. These enhancements and their impact are described in this paper. These enhancements reduced the calculated risk of core uncovery by about a factor of four for a refueling outage without lengthening the outage schedule; increased the outage efficiency, contributing to completing 11 days ahead of schedule; and helped to earn the highest achievable SALP rating from the NRC. (author)

  4. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  5. Qinshan CANDU NPP outage performance improvement through benchmarking

    International Nuclear Information System (INIS)

    Jiang Fuming

    2005-01-01

    With the increasingly fierce competition in the deregulated Energy Market, the optimization of outage duration has become one of the focal points for the Nuclear Power Plant owners around the world. People are seeking various ways to shorten the outage duration of NPP. Great efforts have been made in the Light Water Reactor (LWR) family with the concept of benchmarking and evaluation, which great reduced the outage duration and improved outage performance. The average capacity factor of LWRs has been greatly improved over the last three decades, which now is close to 90%. CANDU (Pressurized Heavy Water Reactor) stations, with its unique feature of on power refueling, of nuclear fuel remaining in the reactor all through the planned outage, have given raise to more stringent safety requirements during planned outage. In addition, the above feature gives more variations to the critical path of planned outage in different station. In order to benchmarking again the best practices in the CANDU stations, Third Qinshan Nuclear Power Company (TQNPC) have initiated the benchmarking program among the CANDU stations aiming to standardize the outage maintenance windows and optimize the outage duration. The initial benchmarking has resulted the optimization of outage duration in Qinshan CANDU NPP and the formulation of its first long-term outage plan. This paper describes the benchmarking works that have been proven to be useful for optimizing outage duration in Qinshan CANDU NPP, and the vision of further optimize the duration with joint effort from the CANDU community. (authors)

  6. Optimization of safety equipment outages improves safety

    International Nuclear Information System (INIS)

    Cepin, Marko

    2002-01-01

    Testing and maintenance activities of safety equipment in nuclear power plants are an important potential for risk and cost reduction. An optimization method is presented based on the simulated annealing algorithm. The method determines the optimal schedule of safety equipment outages due to testing and maintenance based on minimization of selected risk measure. The mean value of the selected time dependent risk measure represents the objective function of the optimization. The time dependent function of the selected risk measure is obtained from probabilistic safety assessment, i.e. the fault tree analysis at the system level and the fault tree/event tree analysis at the plant level, both extended with inclusion of time requirements. Results of several examples showed that it is possible to reduce risk by application of the proposed method. Because of large uncertainties in the probabilistic safety assessment, the most important result of the method may not be a selection of the most suitable schedule of safety equipment outages among those, which results in similarly low risk. But, it may be a prevention of such schedules of safety equipment outages, which result in high risk. Such finding increases the importance of evaluation speed versus the requirement of getting always the global optimum no matter if it is only slightly better that certain local one

  7. How individual traces and interactive timelines could support outage execution - Toward an outage historian concept

    International Nuclear Information System (INIS)

    Parfouru, S.; De-Beler, N.

    2012-01-01

    In the context of a project that is designing innovative ICT-based solutions for the organizational concept of outage management, we focus on the informational process of the OCR (Outage Control Room) underlying the execution of the outages. Informational process are based on structured and unstructured documents that have a key role in the collaborative processes and management of the outage. We especially track the structured and unstructured documents, electronically or not, from creation to sharing. Our analysis allows us to consider that the individual traces produced by an individual participant with a specific role could be multi-purpose and support sharing between participants without creating duplication of work. The ultimate goal is to be able to generate an outage historian, that is not just focused on highly structured information, which could be useful to improve the continuity of information between participants. We study the implementation of this approach through web technologies and social media tools to address this issue. We also investigate the issue of data access through interactive visualization timelines coupled with other modality's to assist users in the navigation and exploration of the proposed historian. (authors)

  8. Major outage trends in light water reactors. Interim report

    International Nuclear Information System (INIS)

    Burns, E.T.

    1978-04-01

    The report is a summary of the major outages which occurred in light water reactor plants during the period January 1971 through June 1977. Only those outages greater than 100 hours duration (exclusive of refueling outages) are included in the report. The trends in outages related to various reactor systems and components are presented as a function of plant age, and alternatively, calendar year. The principal contributors to major outages are ranked by their effect on the overall outage time for PWRs and BWRs. In addition, the outage history of each operating nuclear plant greater than 150 MWe is presented, along with a brief summary of those outages greater than two months duration

  9. Advanced Test Reactor outage risk assessment

    International Nuclear Information System (INIS)

    Thatcher, T.A.; Atkinson, S.A.

    1997-01-01

    Beginning in 1997, risk assessment was performed for each Advanced Test Reactor (ATR) outage aiding the coordination of plant configuration and work activities (maintenance, construction projects, etc.) to minimize the risk of reactor fuel damage and to improve defense-in-depth. The risk assessment activities move beyond simply meeting Technical Safety Requirements to increase the awareness of risk sensitive configurations, to focus increased attention on the higher risk activities, and to seek cost-effective design or operational changes that reduce risk. A detailed probabilistic risk assessment (PRA) had been performed to assess the risk of fuel damage during shutdown operations including heavy load handling. This resulted in several design changes to improve safety; however, evaluation of individual outages had not been performed previously and many risk insights were not being utilized in outage planning. The shutdown PRA provided the necessary framework for assessing relative and absolute risk levels and assessing defense-in-depth. Guidelines were written identifying combinations of equipment outages to avoid. Screening criteria were developed for the selection of work activities to receive review. Tabulation of inherent and work-related initiating events and their relative risk level versus plant mode has aided identification of the risk level the scheduled work involves. Preoutage reviews are conducted and post-outage risk assessment is documented to summarize the positive and negative aspects of the outage with regard to risk. The risk for the outage is compared to the risk level that would result from optimal scheduling of the work to be performed and to baseline or average past performance

  10. World-class outage performance of the Olkiluoto nuclear power plant

    International Nuclear Information System (INIS)

    Paavola, M.

    1998-01-01

    The production of the Olkiluoto power plant units covered 17% of the electricity consumption in Finland in 1997; the total share of nuclear energy was 27% of the electricity consumed in the country. Based on Finnish experience, nuclear energy is a safe, environmentally friendly and economic way to produce electricity provided that the plants and their personnel are well taken care of. TVO's policy is to keep the plant units in good condition and technically modern. This requires continuous investments in the plant. In maintenance, attention is paid to monitoring the condition of the plant and to preventive maintenance aiming at avoiding disturbances in production. TVO has chosen continuous development as the operational line develops the plant by annual investments and performs the necessary modifications during planned annual outages trying to avoid long production interruptions. The load factors of the Olkiluoto nuclear power plant have been high. The average load factor during the last decade was over 93%. The most significant single factor in the production deficits is the amount or electricity, which has not been produced because of the annual outages. Due to this, special attention has been paid to the performance of the annual outages. TVO aims at continuous development of the annual outage procedure. A centralized task management system makes it possible to perform simultaneously more tasks than before. The company has also invested in equipment and systems, which ease and speed up servicing. Normal outage length varies between 10 and 16 days. By keeping the plant units as modern as possible and in good condition we facilitate reaching TVO's target, which is also stated in TVO's slogan 'always 40 years lifetime'. (author)

  11. Nuclear outages: an approach to project controls

    International Nuclear Information System (INIS)

    Bryson, R.

    1985-01-01

    The annual budget for maintaining and operating a nuclear power plant has risen dramatically over the past 5 years. NRC-mandated plant improvements and outage related expenses are often cited to be the main contributors to these escalating budgets. Nuclear utilities have responded by developing programs to improve plant availability and outage costs through improved outage performance. Utilities recognize that for capital improvements the program to control costs does no begin with outage planning, but rather more appropriately up front during the engineering phase. To support their management objectives, utilities have been developing comprehensive project control systems for concurrently reducing capital expenditures, outage-related costs, and time. This paper provides an approach to project controls that, rather than using one all inclusive comprehensive system, requires five separate monitoring systems - one for each phase of an activity's life cycle. Through the integration of these discrete but interrelated systems, utility management acquires the necessary tools for comprehensive planning and control of their modification program and effective detailed monitoring for all outage-related activities

  12. Outage Risk Assessment and Management (ORAM) technology to improve outage safety and economics

    International Nuclear Information System (INIS)

    Kalra, S.P.

    2004-01-01

    The Electric Power Research Institute (EPRI) has undertaken an aggressive program, called ORAM (Outage Risk Assessment and Management), to provide utilities with tools and technology to assist in managing risk during the planning and conduct of outages. The ORAM program consists of the following 6 steps: i) Perform utility surveys and visits on shutdown risk management needs, ii) Perform probabilistic shutdown safety assessments (PSSAs) to identify generic insights that can be incorporated into risk management guidelines and identify selected areas for the development of contingency actions, iii) Develop risk management guidelines (RMG's) that provide a systematic approach to the planning and conduct of outages from a safety perspective. Incorporate insights from the shutdown safety assessments and other operating experience into the RMG's. iv) Develop selected contingency actions including a thermalhydraulic tool kit to address higher risk time periods and activities identified in the shutdown safety assessments, v) Develop computer software that integrates all of the above capability into an easy to use tool for effective shutdown operation management for utilities, vi) Provide assistance in the transfer of this technology and the application of these tools. This paper briefly describes the technical approach and tools developed under EPRI's ORAM program and its applications for improving outage safety and economics. (author)

  13. Standard plants, standard outages: the EdF approach

    International Nuclear Information System (INIS)

    Miron, J.L.

    1991-01-01

    At the end of 1990 Electricite de France had carried out a total of 350 PWR refuelling outages. Although the French units are standardized the routine of the outages are not all the same. The major influences on outages were: setting up new organizations to apply quality assurance regulations; improving systematic experience feedback; incorporating modifications in the outage schedules; assumilation of computerized maintenance management by the sites. (author)

  14. Primary Water Chemistry Control during a Planned Outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, Guoping; Nashiem, Rod; Matheson, Shane; Yabar, Berman; Harper, Bill; Roberts, John G.

    2012-09-01

    Bruce Power has developed a comprehensive outage water chemistry program, which includes both primary and secondary chemistry requirements during planned outages. The purpose of the program is to emphasize the chemistry requirements during outages and subsequent start-ups in order to maintain the integrity of the systems, minimise activity transport and radiation fields, reduce the Carbon-14 release, and to ensure that the requirements are integrated with the outage management program. Prior to a planned outage, Station Chemical Technical Sections identify outage chemistry requirements to Operations and Outage Planning and ensure that work necessary to correct system chemistry issues is within outage work scope. The outage water chemistry program provides direction for establishing alternative sampling locations as demanded by the system configuration during the outage and identifies outage prerequisites for nuclear system purification capabilities. These requirements are contained in an outage checklist. The paper mainly highlights the primary water chemistry issues and chemistry control strategies during planned outages and discusses challenges and successes. (authors)

  15. Integrated outages increase Surry's availability

    International Nuclear Information System (INIS)

    Harms, S.R.; Downs, J.L.

    1995-01-01

    This article describes how, through Virginia Power's and Westinghouse's goal-oriented planning philosophy, teamwork and commitment, average outage duration has decreased significantly. During the past 10 years Virginia Power and its nuclear steam supply system (NSSS) services vendor, Westinghouse Electric Corp., have developed a working partnership with one goal in mind: increasing the availability and capacity factors of the North Anna and Surry nuclear power stations while driving down the operating costs of the plants. The outage integration program, steam generator maintenance agreement (SGMA), and integrated radiological services program form the core of this relationship and helped Virginia Power complete one of the most successful outages in Surry Power Station's operating history

  16. Reactor refurbishment in an outage environment

    International Nuclear Information System (INIS)

    Gowthorpe, P.; Hoare, R.

    2012-01-01

    Reactor life extension has typically been performed during specific refurbishment outages. These outages are long and costly due to the sheer complexity of the scope, not to mention the ever present discovery work. A scope of this size requires a huge labour force to execute, which poses significant challenges. The work is difficult to staff with qualified people able to execute the work smoothly and managing the required labour pool problematic. Cost and time overruns are inevitable in that environment. Reducing the cost and schedule is critical to the long term viability of reactor refurbishment projects. With planning, the total cost of the refurbishment can be reduced by managing the inspection and repairs during normal outages. Identifying what activities need to be done each outage for the life of the reactor and bringing the latest technology can make this viable. Tightly planned outages with a small well trained labour force will go a long way to reducing costs. The suite of services and tooling available to the utilities to manage their reactor integrity has improved significantly in recent years and continues to evolve. New feeder inspection technologies can provide improved inspection results for the complex feeder geometry. These improvements lead to more accurate wear rates and better predictions of component life. Feeders that need replacement based on improved inspection techniques can be replaced systematically during regular outages rather than specific refurbishment outages. Targeting areas rather than entire feeders reduces time, dose and cost. In cases where feeder replacement isn't feasible or where unpredicted wear is found, a feeder weld overlay process can be used. To manage the reactor work, new data systems are under development that allow for effective tracking of each activity performed and outcomes in a single package. (author)

  17. Improving nuclear utility generation capacity, understanding the sources of forced outage and learning how to prevent them

    International Nuclear Information System (INIS)

    Brodeur, D.L.; Todreas, N.E.; Angus, V.T.

    1998-01-01

    MIT and PECO Energy have completed a detailed examination of the sources of forced outages at the Limerick Generating Station (LGS) Boiling Water Reactor Class IV (BWR IV) site over a five year period and contrasted that information to similar BWR IV utilities in the United States over the same period. Each forced outage was attributed to one system and assigned causal codes of equipment versus human factors and failure attributes such as weak design, poor craftsmanship, and worn parts. It was found that fifty four percent of the lost power at LGS was the result of Balance of Plant failures. Industry wide data identifies fifty nine percent of the lost power as attributed to Balance of Plant failures. Balance of Plant systems are those systems not included in the primary and safety related system category. Considering failure causal factors, forty six percent of the lost power at the utility under study was the result of equipment factors such as weak design or worn parts. Significantly, the study showed a high variance between those systems which caused significant forced outage at the two sister LGS units. This demonstrated the infrequent nature of plant forced outages within a given system. This was supported by the observation that dominant systems attributing to forced outage at LGS were not equally represented in industry data. It is suggested that for individual utilities to dramatically improve unit capability factors with regard to Balance of Plant systems, they must learn from industry wide experiences and develop cooperative means of exchanging lessons learned among similarly designed plants and systems. With the broad knowledge base of system failures, current designs must be frequently assessed and altered until each system poses an acceptable level of risk to generation capacity. (author)

  18. Outage Probability Analysis of FSO Links over Foggy Channel

    KAUST Repository

    Esmail, Maged Abdullah

    2017-02-22

    Outdoor Free space optic (FSO) communication systems are sensitive to atmospheric impairments such as turbulence and fog, in addition to being subject to pointing errors. Fog is particularly severe because it induces an attenuation that may vary from few dBs up to few hundreds of dBs per kilometer. Pointing errors also distort the link alignment and cause signal fading. In this paper, we investigate and analyze the FSO systems performance under fog conditions and pointing errors in terms of outage probability. We then study the impact of several effective communication mitigation techniques that can improve the system performance including multi-hop, transmit laser selection (TLS) and hybrid RF/FSO transmission. Closed-form expressions for the outage probability are derived and practical and comprehensive numerical examples are suggested to assess the obtained results. We found that the FSO system has limited performance that prevents applying FSO in wireless microcells that have a 500 m minimum cell radius. The performance degrades more when pointing errors appear. Increasing the transmitted power can improve the performance under light to moderate fog. However, under thick and dense fog the improvement is negligible. Using mitigation techniques can play a major role in improving the range and outage probability.

  19. Outage Probability Analysis of FSO Links over Foggy Channel

    KAUST Repository

    Esmail, Maged Abdullah; Fathallah, Habib; Alouini, Mohamed-Slim

    2017-01-01

    Outdoor Free space optic (FSO) communication systems are sensitive to atmospheric impairments such as turbulence and fog, in addition to being subject to pointing errors. Fog is particularly severe because it induces an attenuation that may vary from few dBs up to few hundreds of dBs per kilometer. Pointing errors also distort the link alignment and cause signal fading. In this paper, we investigate and analyze the FSO systems performance under fog conditions and pointing errors in terms of outage probability. We then study the impact of several effective communication mitigation techniques that can improve the system performance including multi-hop, transmit laser selection (TLS) and hybrid RF/FSO transmission. Closed-form expressions for the outage probability are derived and practical and comprehensive numerical examples are suggested to assess the obtained results. We found that the FSO system has limited performance that prevents applying FSO in wireless microcells that have a 500 m minimum cell radius. The performance degrades more when pointing errors appear. Increasing the transmitted power can improve the performance under light to moderate fog. However, under thick and dense fog the improvement is negligible. Using mitigation techniques can play a major role in improving the range and outage probability.

  20. Indicators for management of planned outages in nuclear power plants

    International Nuclear Information System (INIS)

    2006-04-01

    The outages considered within the scope of this publication are planned refuelling outages (PWR and BWR nuclear power plants) and planned outages associated with major maintenance, tests and inspections (PHWR and LWGR nuclear power plants). The IAEA has published some valuable reports providing guidance and assistance to operating organizations on outage management. This TECDOC outlines main issues to be considered in outage performance monitoring and provides guidance to operating organizations for the development and implementation of outage programmes which could enhance plant safety, reliability and economics. It also complements the series of reports published by the IAEA on outage management and on previous work related to performance indicators developed for monitoring different areas of plant operation, such as safety, production, reliability and economics. This publication is based upon the information presented at a technical meeting to develop a standardized set of outage indicators for outage optimization, which was organised in Vienna, 6-9 October 2003. At this meeting, case studies and good practices relating to performance indicator utilization in the process of planned outage management were presented and discussed

  1. Outage costs: who should pay?

    International Nuclear Information System (INIS)

    Stivison, D.V.

    1986-01-01

    Decisions affecting the Three Mile Island-1 and -2 reactors illustrate new an stricter standards which apply to how regulator will allocate the costs of outages. The rule allows outages for normal refueling and other normal shutdowns if return to the power grid is assured. TMI-1 was removed from the rate base one year after the accident, and was readmitted only after achieving full power in 1986. A reasonableness standard based on an analysis of the outage and utility responses is the basis for deciding for or against removal. The author cites cases in which unreasonable actions caused the Nuclear Regulatory Commission to charge utility management with imprudence. New safety standards will force utilities to reduce employee error, equipment failure, and management weakness. 19 references

  2. The control of reactor outages

    International Nuclear Information System (INIS)

    Bouget, Y.H.; Berteloot, J.M.

    1995-01-01

    The 1985-1992 period was marked by a continuous decay in French reactors operation. This situation has led the Committee for Outages Mastery to take steps for the improvement of nuclear power plants availability. The control of reactor outages requires an integrated vision of the safety, duration, dosimetry, costs and security aspects and a perfect management of contractors. The paper describes the methodology used for the management and the maintenance of the French PWR reactors stock. A detailed schedule of maintenance tasks with dose estimations is now required from each site to anticipate and optimize the duration of outages. Thanks to this action, a significant reduction of the maintenance costs is observed for the 1992-1995 period. (J.S.). 2 figs

  3. WNP-2 outage safety review methodology

    International Nuclear Information System (INIS)

    Chiang, Albert; Fu, James

    2004-01-01

    A practical and versatile method was developed in the flow chart and checklist forms to show the defense-in-depth for various key safety functions of a nuclear power plant during shutdown. Using four different colors (green, yellow, orange, and red) for indication of levels of defense-in-depth is visually impressive, easy to understand, and was adopted by the outage management personnel as a convenient reference tool for maintenance activity planning before the outage, and schedule changes during the outage. This paper describes the method and its application at Washington Public Power Supply System's Nuclear Project 2 (WNP-2). (author)

  4. Unit availability not affected by extending outage cycles

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D.J.

    2003-03-01

    To improve their economic dispatch position, more and more plant owners are extending the intervals between major outages for boilers from one year to 18-24 months and for steam turbine up to 12 years. In many instances, extended outage cycles have resulted in no loss in availability or increases in forced outages. The article discusses outage scheduling at Tucson Electric Power's Springville coal-fired plant, the Panther Creek Energy Facility in Pennsylvania, and at Tennessee Valley Authority's coal-fired power plants. 1 fig.

  5. Technology Integration Initiative In Support of Outage Management

    Energy Technology Data Exchange (ETDEWEB)

    Gregory Weatherby; David Gertman

    2012-07-01

    Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Often, command and control during outages is maintained in the outage control center where many of the underlying technologies supporting outage control are the same as those used in the 1980’s. This research reports on the use of advanced integrating software technologies and hand held mobile devices as a means by which to reduce cycle time, improve accuracy, and enhance transparency among outage team members. This paper reports on the first phase of research supported by the DOE Light Water Reactor Sustainability (LWRS) Program that is performed in close collaboration with industry to examine the introduction of newly available technology allowing for safe and efficient outage performance. It is thought that this research will result in: improved resource management among various plant stakeholder groups, reduced paper work, and enhanced overall situation awareness for the outage control center management team. A description of field data collection methods, including personnel interview data, success factors, end-user evaluation and integration of hand held devices in achieving an integrated design are also evaluated. Finally, the necessity of obtaining operations cooperation support in field studies and technology evaluation is acknowledged.

  6. Contingency Analysis of Cascading Line Outage Events

    Energy Technology Data Exchange (ETDEWEB)

    Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

    2011-03-01

    As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

  7. Predicting Power Outages Using Multi-Model Ensemble Forecasts

    Science.gov (United States)

    Cerrai, D.; Anagnostou, E. N.; Yang, J.; Astitha, M.

    2017-12-01

    Power outages affect every year millions of people in the United States, affecting the economy and conditioning the everyday life. An Outage Prediction Model (OPM) has been developed at the University of Connecticut for helping utilities to quickly restore outages and to limit their adverse consequences on the population. The OPM, operational since 2015, combines several non-parametric machine learning (ML) models that use historical weather storm simulations and high-resolution weather forecasts, satellite remote sensing data, and infrastructure and land cover data to predict the number and spatial distribution of power outages. A new methodology, developed for improving the outage model performances by combining weather- and soil-related variables using three different weather models (WRF 3.7, WRF 3.8 and RAMS/ICLAMS), will be presented in this study. First, we will present a performance evaluation of each model variable, by comparing historical weather analyses with station data or reanalysis over the entire storm data set. Hence, each variable of the new outage model version is extracted from the best performing weather model for that variable, and sensitivity tests are performed for investigating the most efficient variable combination for outage prediction purposes. Despite that the final variables combination is extracted from different weather models, this ensemble based on multi-weather forcing and multi-statistical model power outage prediction outperforms the currently operational OPM version that is based on a single weather forcing variable (WRF 3.7), because each model component is the closest to the actual atmospheric state.

  8. Analysis of T101 outage radiation dose

    International Nuclear Information System (INIS)

    Li, Zhonghua

    2008-01-01

    Full text: Collective radiation dose during outage is about 80% of annual collective radiation dose at nuclear power plants (NPPs). T 101 Outage is the first four-year outage of Unit 1 at Tianwan Nuclear Power Station (TNPS) and thorough overhaul was undergone for the 105-day's duration. Therefore, T 101 Outage has significant reference meaning to reducing collective radiation dose at TNPS. This paper collects the radiation dose statistics during T 101 Outage and analyses the radiation dose distribution according to tasks, work kinds and varying trend of the collective radiation dose etc., comparing with other similar PWRs in the world. Based on the analysis this paper attempts to find out the major factors in collective radiation dose during T 101 Outage. The major positive factor is low radiation level at workplace, which profits from low content of Co in reactor construction materials, optimised high-temperature p H value of the primary circuit coolant within the tight range and reactor operation without trips within the first fuel cycle. One of the most negative factors is long outage duration and many person-hours spent in the radiological controlled zone, caused by too many tasks and inefficient work. So besides keeping good performance of reducing radioactive sources, it should be focused on how to improve implementation of work management including work selection, planning and scheduling, work preparation, work implementation, work assessment and feedback, which can lead to reduced numbers of workers needed to perform a task, of person-hours spent in the radiological controlled zone. Moreover, this leads to reduce occupational exposures in an ALARA fashion. (author)

  9. Pricing power outages in the Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Baarsma, Barbara E.; Hop, J. Peter [SEO Economic Research/University of Amsterdam, Amsterdam (Netherlands)

    2009-09-15

    In most Western countries, the power grid provides electricity more than 99% of the time. To maintain reliability at such high levels, energy companies have to continually invest in electric transmission- and distribution systems. Since customers of electricity cannot switch from one distribution network to another, no economic incentive exists that matches the supplied reliability to customer preferences. Either under- or over-investment in reliability may thus result. In order to introduce market-like incentives, the Dutch Energy Regulator introduced a regulatory system based on the (perceived) costs of power outages. An essential ingredient of the regulation is the cost of a power outage of a particular duration (i.e., 1 minute). This paper measures these outage cost by using conjoint analysis. We find that the social cost of the present Dutch level of reliability - that is, one outage of two hours every four years - is EUR2.80 on average for every household, and EUR33.10 on average for every SME firm. The total costs to Dutch society are almost EUR50 million. (author)

  10. Residential outage cost estimation: Hong Kong

    International Nuclear Information System (INIS)

    Woo, C.K.; Ho, T.; Shiu, A.; Cheng, Y.S.; Horowitz, I.; Wang, J.

    2014-01-01

    Hong Kong has almost perfect electricity reliability, the result of substantial investments ultimately financed by electricity consumers who may be willing to accept lower reliability in exchange for lower bills. But consumers with high outage costs are likely to reject the reliability reduction. Our ordered-logit regression analysis of the responses by 1876 households to a telephone survey conducted in June 2013 indicates that Hong Kong residents exhibit a statistically-significant preference for their existing service reliability and rate. Moreover, the average residential cost estimate for a 1-h outage is US$45 (HK$350), topping the estimates reported in 10 of the 11 studies published in the last 10 years. The policy implication is that absent additional compelling evidence, Hong Kong should not reduce its service reliability. - Highlights: • Use a contingent valuation survey to obtain residential preferences for reliability. • Use an ordered logit analysis to estimate Hong Kong's residential outage costs. • Find high outage cost estimates that imply high reliability requirements. • Conclude that sans new evidence, Hong Kong should not reduce its reliability

  11. Outage management: A case study

    International Nuclear Information System (INIS)

    Haber, S.B.; Barriere, M.T.; Roberts, K.H.

    1992-01-01

    Outage management issues identified from a field study conducted at a two-unit commercial pressurized water reactor (PWR), when one unit was in a refueling outage and the other unit was at full power operation, are the focus of this paper. The study was conduced as part of the US Nuclear Regulatory Commission's (NRC) organizational factors research program, and therefore the issues to be addressed are from an organizational perspective. Topics discussed refer to areas identified by the NRC as critical for safety during shutdown operations, including outage planning and control, personnel stress, and improvements in training and procedures. Specifically, issues in communication, management attention, involvement and oversight, administrative processes, organizational culture, and human resources relevant to each of the areas are highlighted by example from field data collection. Insights regarding future guidance in these areas are presented based upon additional data collection subsequent to the original study

  12. The process of NPP refuelling outage analysis and follow-up

    International Nuclear Information System (INIS)

    Nemec, T.; Savli, S.; Cernilogar Radez, M.; Persic, A.; Pecek, V.; Stritar, A.

    2007-01-01

    Following the outages in 2004 and 2006, the Slovenian Nuclear Safety Administration (SNSA) has started with the practice of independent outage analysis in a form of an internal report. It includes a comparison of performed activities against the planned time schedule of activities, evaluation of design modifications implementation and analysis of significant events. The main result of the outage analysis is a list of recommendations and some open issues that have been identified. These findings are the basis for development of an action plan for SNSA activities until the next outage, aimed at eliminating deficiencies found out during the outage and further improving outage activities. The established system of outage supervision together with the final analysis and long term action plan represents an effective continuous safety supervision process, by which the regulatory body independently contributes to the higher level of safety culture both at the licensee and among its own staff. (author)

  13. Extended layup of steam generators during a refurbishment outage

    International Nuclear Information System (INIS)

    Marks, C.R.; Little, M.D.; Slade, J.; Gendron, T.

    2009-01-01

    In May 2008, Point Lepreau Generating Station (PLGS), owned and operated by New Brunswick Power Nuclear (NBPN), entered an extended refurbishment outage initially expected to last approximately 18 months. NBPN had the two inter-related goals with respect to layup of the steam generators during this period: equipment preservation and inspection interval modification. The steam generators were to be preserved such that there was no loss of operating life due to corrosion of either the tubing (Alloy 800NG) or other internal components (with carbon steel being the limiting material with respect to corrosion). Additionally, NBPN desired that the time in layup not count as operating time in setting the schedule for future inspections. That is, a key goal of the steam generator layup is that the future inspection interval be based on operating time, not calendar time. The NBPN approach consists of the following four steps: A review of industry operating experience with long outages (including both PWRs and PHWRs); The development of technically based layup strategies and procedures; A mid-outage review of the implementation of the layup strategies and procedures; and A post-outage review to determine if the actual conditions in the steam generators will support modification of the inspection interval. This paper discusses the results of the first three of these steps. At this time, the plant is still in the refurbishment outage. Throughout the outage evaluation process, the following issues have been the main focus of the reviews: The potential for degradation (pitting and cracking) of steam generator tubes; The potential for general corrosion of carbon and low alloy steel internals; Oxidation of deposits (which could subsequently lead to oxidizing conditions during operation, possibly leading to tube degradation). This paper discusses the industry operating experience reviewed, the pre-outage assessments, and the mid-outage assessments. Current outage planning places the

  14. Partnership - its contribution to outage success

    International Nuclear Information System (INIS)

    Gill, K.S.; Kirton-Darling, F.; Robinson, F.T.

    1996-01-01

    An innovative approach to developing the teamwork between the power station and the outage contractor has been pioneered over the past three years at the Bradwell nuclear power station in the UK, which houses two Magnox reactors. Magnox Electric and Rolls-Royce Nuclear Engineering Services are now undertaking their third outage under a partnership contract which has provided significant benefits to both parties. (Author)

  15. San Onofre - the evolution of outage management

    International Nuclear Information System (INIS)

    Slagle, K.A.

    1993-01-01

    With the addition of units 2 and 3 to San Onofre nuclear station in 1983 and 1984, it became evident that a separate group was needed to manage outages. Despite early establishment of a division to handle outages, it was a difficult journey to make the changes to achieve short outages. Early organizational emphasis was on developing an error-free operating environment and work culture. This is difficult for a relatively large organization at a three-unit site. The work processes and decision styles were designed to be very deliberate with many checks and balances. The organization leadership and accountability were focused in the traditional operations, maintenance, and engineering divisions. Later, our organization emphasis shifted to achieving engineering excellence. With a sound foundation of operating and engineering excellence, our organizational focus has turned to achieving quality outages. This means accomplishing the right work in a shorter duration and having the units run until the next refueling

  16. Pollution Prevention Successes Database (P2SDb) user guide

    International Nuclear Information System (INIS)

    1995-07-01

    When Pollution Prevention Opportunity Assessments (P2OAs) were launched at the Hanford Site during the summer of 1994, the first comment received from those using them expressed the desire for a method to report assessments electronically. As a temporary measure, macros were developed for use on word processing systems, but a more formal database was obviously needed. Additionally, increased DOE and Washington state reporting requirements for pollution prevention suggested that a database system would streamline the reporting process. The Pollution Prevention Group of Westinghouse Hanford Company (WHC) contracted with the Data Automation Engineering Department from ICF Kaiser Hanford Company (ICFKH) to develop the system. The scope was to develop a database that will track P2OAs conducted by the facilities and contractors at the Hanford Site. It will also track pollution prevention accomplishments that are not the result of P2OAs and document a portion of the Process Waste Assessments conducted in the past. To accommodate the above criteria, yet complete the system in a timely manner, the Pollution Prevention Successes Database (P2SDb) is being implemented in three phases. The first phase will automate the worksheets to provide both input and output of the data associated with the worksheets. The second phase will automate standard summary reports and ad hoc reports. The third phase will provide automated searching of the database to facilitate the sharing of pollution prevention experiences among various users. This User's Guide addresses only the Phase 1 system

  17. The status of the Hanaro class 4 power outage

    International Nuclear Information System (INIS)

    Hyungkyoo, K.; Hoansung, J.; Jongsup, W.

    2004-01-01

    Electric power is essential for all industrial plant. All who use electric power desire a perfect frequency, voltage stability, and reliability all the time. But this cannot be realized in practice because of the many causes of a power supply disturbance that are beyond the control of the utility. Since the first criticality of the Hanaro research reactor, the major reasons for reactor trips were system malfunctions and inexperienced operators in the initial stage of its operation. As Hanaro is stabilizing, the power supply outage becomes the major reason for a reactor trip. This paper describes the status of power supply outages. This paper deals with not only the outages which have an effect on Hanaro operation but also the reasons for the Hanaro class-4 power outages. The class-4 power is a commercial power which supplies the load centers and the large motors such as primary cooling pumps and secondary cooling pumps. Even if a class-4 power outage occurs, Hanaro is safe because of the reactor cooling by natural convection and the flywheel effect of the primary cooling pumps. The analysis of the characteristics and the trends of the outages can provide clues to how the outages can be minimized and what the impact of the outages are on the operation. For the site-wide class-4 power, the latest failure rate has been 2.36 per year and the mean time to repair is 23,78 minutes for the exponentially weighted mowing average. The unavailability of the Class-4 power is 1.5 10 -4

  18. Nuclear safety risk control in the outage of CANDU unit

    International Nuclear Information System (INIS)

    Wu Mingliang; Zheng Jianhua

    2014-01-01

    Nuclear fuel remains in the core during the outage of CANDU unit, but there are still nuclear safety risks such as reactor accidental criticality, fuel element failure due to inability to properly remove residual heat. Furthermore, these risks are aggravated by the weakening plant system configuration and multiple cross operations during the outage. This paper analyzes the phases where there are potential nuclear safety risks on the basis of the typical critical path arrangement of the outage of Qinshan NPP 3 and introduces a series of CANDU-specific risk control measures taken during the past plant outages to ensure nuclear safety during the unit outage. (authors)

  19. Outage time reduction in GKN II without loss of safety

    International Nuclear Information System (INIS)

    Sturm, J.

    1999-01-01

    GKN II is a 1340 MWE 4-loop pressurised water reactor from Siemens KONVOI type, located in the south of Germany. It was originally connected to the grid at the end of 1988. Commercial operation under utility responsibility started at the second half of 1989. The first outage was performed in 1990. Beginning from this date, the outage duration was contiguously reduced from 33 days to 15 days in 1996. In 1998, two refueling and maintenance outages were performed, each with a duration of 7 days. Key planning factors to achieve these results are: A well adapted planning organisation with an outage manager and an outage planning team. An effective long term planning. This means the combination of work with a long duration every 4 or 8 years. No longlasting work in the years in between. Main work only on one safety train per year. Optimisation and standardisation of the shutdown and the startup sequence. The real change of reactor states have been modified, compared to the vendor recommendations. An tests are assigned to plant conditions, where they are most effective and are less time critical. Small modifications in the plant, mainly on the auxiliary systems, to speedup some sequences. Extreme detailed planning of maintenance and periodic tests. Each work/test can be found in a detailed schedule with a dedicated time widow. Optimized tools to perform the detailed planning and to implement the feedback of experience from former outages. Optimized tools for maintenance and handlings of heavy equipment on the critical path. Optimized tools to perform periodic tests. Key factors during outage are: Permanent control of the schedules with an updated 3-day program. Best and permanent information with this 3-day program of all people that are involved. Fast reaction on delays. Outage managers permanent on site. Gain in safety during shutdown states, with reduced outage duration: It has to be proven, that short outages don't lead to faster and less accurate work. It can be

  20. Partnership - the heart of integrated outage management

    International Nuclear Information System (INIS)

    Robinson, F.T.

    1995-01-01

    Changes in the power generating industry continue apace. The effects of privatisation are widely visible: nowhere more so than in the growing national and international competition facing the generators around the world. A successful, long-term marriage between generator and contractor on power station outage management offers significant scope for cost reduction, shortening annual plant downtime and generating more megawatts, all within a safety environment of continuous improvement. Working in close partnership, Nuclear Electric and Rolls-Royce Nuclear Engineering Services have remodelled the whole contractor/client strategy. The new discipline, known as integrated outage management and partnering, is already producing shorter outage periods at Bradwell, a Magnox Station in Essex. (author)

  1. Evolution of an outage management organization in a small utility

    International Nuclear Information System (INIS)

    Oubre, R.P.; Shetler, J.

    1985-01-01

    Six refueling outages with a number of major equipment failure outages have taught Rancho Seco management three main items. One is that a dedicated management organization must be formed for the purpose of controlling work functions at Rancho Seco. This dedicated organization must have the experience of the plant and not have the responsibility for the actual maintenance. Second, upper management within a power plant must get directly involved in the outage. Upper management must show their presence, give input, and be available when needed. The third item learned is that the scheduling organization must be adequately staffed. Although Rancho Seco completed a refueling outage in 1978 within only 36 days, additional inspection requirements due to regulatory changes and/or previous equipment failures requiring follow-up actions would place the shortest possible outage today at approx.70 days. The only way an organization can keep this outage time down is with the proper scheduling of the resources and the timely coordination of activities to reduce conflicts

  2. Cell outage compensation in LTE networks: Algorithms and performance assessment

    NARCIS (Netherlands)

    Amirijoo, M.; Jorguseski, L.; Litjens, R.; Schmelz, L.C.

    2011-01-01

    Cell outage compensation is a self-healing function and as such part of the Self-Organising Networks concept for mobile wireless networks. It aims at mitigating the degradation of coverage, capacity and service quality caused by a cell or site level outage. Upon detection of such an outage, cell

  3. Analysis of scrams and forced outages at boiling water reactors

    International Nuclear Information System (INIS)

    Earle, R.T.; Sullivan, W.P.; Miller, K.R.; Schwegman, W.J.

    1980-07-01

    This report documents the results of a study of scrams and forced outages at General Electric Boiling Water Reactors (BWRs) operating in the United States. This study was conducted for Sandia Laboratories under a Light Water Reactor Safety Program which it manages for the United States Department of Energy. Operating plant data were used to identify the causes of scrams and forced outages. Causes of scrams and forced outages have been summarized as a function of operating plant and plant age and also ranked according to the number of events per year, outage time per year, and outage time per event. From this ranking, identified potential improvement opportunities were evaluated to determine the associated benefits and impact on plant availability

  4. Maintenance, outages and chemistry really can be compatible

    International Nuclear Information System (INIS)

    Roberts, J.G.; Deaconescu, R.

    2006-01-01

    'Full text:' In their address to the Canadian Nuclear Society, Bruce Power's Chemistry Design staff will describe how maintenance and outages can impact negatively on chemistry control and asset protection. Considerations of material impacts and material condition have significant influences on the approach to, and control of, chemistry. This applies equally to operation as it does during unit and/or system outages. Ideas will be presented as to how to facilitate making maintenance, outages and chemistry compatible. It will be shown how the lack of such an approach can lead to disastrous results. (author)

  5. Evaluation of the Planned Outage Durations in EU-APR

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Byung Joon; Lee, Keun Sung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    EU-APR has been designed to comply with European Utility Requirements (EUR) and nuclear design requirements of the European countries. And it is modified and improved from its original design of APR1400. The whole duration varies depending on items for additional process. Refueling and regular maintenance outage is comprised of basic processes and Main turbine-generator outage includes dismantling inspection of main generator and high pressure turbine as a critical path in addition to basic processes. In-Service Inspection Outage includes Automatic ultrasonic inspection on the upper side/lower side of a nuclear reactor as a critical path in addition to basic processes. The planned outage durations of EU-APR are optimized according to the above results. And they are complied with EUR Requirement (EUR 2.2.7.2.2 B), respectively. In addition, outage duration can be reduced with improved operating technology and more maintenance friendly environment including betterment of filling, drain and ventilation.

  6. Evaluation of the Planned Outage Durations in EU-APR

    International Nuclear Information System (INIS)

    Jung, Byung Joon; Lee, Keun Sung

    2016-01-01

    EU-APR has been designed to comply with European Utility Requirements (EUR) and nuclear design requirements of the European countries. And it is modified and improved from its original design of APR1400. The whole duration varies depending on items for additional process. Refueling and regular maintenance outage is comprised of basic processes and Main turbine-generator outage includes dismantling inspection of main generator and high pressure turbine as a critical path in addition to basic processes. In-Service Inspection Outage includes Automatic ultrasonic inspection on the upper side/lower side of a nuclear reactor as a critical path in addition to basic processes. The planned outage durations of EU-APR are optimized according to the above results. And they are complied with EUR Requirement (EUR 2.2.7.2.2 B), respectively. In addition, outage duration can be reduced with improved operating technology and more maintenance friendly environment including betterment of filling, drain and ventilation

  7. Design Concepts for an Outage Control Center Information Dashboard

    International Nuclear Information System (INIS)

    Hugo, Jacques Victor; St Germain, Shawn Walter; Thompson, Cheradan Jo; Whitesides, McKenzie Jo; Farris, Ronald Keith

    2015-01-01

    The nuclear industry, and the business world in general, is facing a rapidly increasing amount of data to be dealt with on a daily basis. In the last two decades, the steady improvement of data storage devices and means to create and collect data along the way influenced the manner in which we deal with information. Most data is still stored without filtering and refinement for later use. Many functions at a nuclear power plant generate vast amounts of data, with scheduled and unscheduled outages being a prime example of a source of some of the most complex data sets at the plant. To make matters worse, modern information and communications technology is making it possible to collect and store data faster than our ability to use it for making decisions. However, in most applications, especially outages, raw data has no value in itself; instead, managers, engineers and other specialists want to extract the information contained in it. The complexity and sheer volume of data could lead to information overload, resulting in getting lost in data that may be irrelevant to the task at hand, processed in an inappropriate way, or presented in an ineffective way. To prevent information overload, many data sources are ignored so production opportunities are lost because utilities lack the ability to deal with the enormous data volumes properly. Decision-makers are often confronted with large amounts of disparate, conflicting and dynamic information, which are available from multiple heterogeneous sources. Information and communication technologies alone will not solve this problem. Utilities need effective methods to exploit and use the hidden opportunities and knowledge residing in unexplored data resources. Superior performance before, during and after outages depends upon the right information being available at the right time to the right people. Acquisition of raw data is the easy part; instead, it is the ability to use advanced analytical, data processing and data

  8. Design Concepts for an Outage Control Center Information Dashboard

    Energy Technology Data Exchange (ETDEWEB)

    Hugo, Jacques Victor [Idaho National Lab. (INL), Idaho Falls, ID (United States); St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thompson, Cheradan Jo [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whitesides, McKenzie Jo [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald Keith [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-12-01

    The nuclear industry, and the business world in general, is facing a rapidly increasing amount of data to be dealt with on a daily basis. In the last two decades, the steady improvement of data storage devices and means to create and collect data along the way influenced the manner in which we deal with information. Most data is still stored without filtering and refinement for later use. Many functions at a nuclear power plant generate vast amounts of data, with scheduled and unscheduled outages being a prime example of a source of some of the most complex data sets at the plant. To make matters worse, modern information and communications technology is making it possible to collect and store data faster than our ability to use it for making decisions. However, in most applications, especially outages, raw data has no value in itself; instead, managers, engineers and other specialists want to extract the information contained in it. The complexity and sheer volume of data could lead to information overload, resulting in getting lost in data that may be irrelevant to the task at hand, processed in an inappropriate way, or presented in an ineffective way. To prevent information overload, many data sources are ignored so production opportunities are lost because utilities lack the ability to deal with the enormous data volumes properly. Decision-makers are often confronted with large amounts of disparate, conflicting and dynamic information, which are available from multiple heterogeneous sources. Information and communication technologies alone will not solve this problem. Utilities need effective methods to exploit and use the hidden opportunities and knowledge residing in unexplored data resources. Superior performance before, during and after outages depends upon the right information being available at the right time to the right people. Acquisition of raw data is the easy part; instead, it is the ability to use advanced analytical, data processing and data

  9. Improving refueling outages through partnership

    International Nuclear Information System (INIS)

    Mercado, Angelo L.

    2004-01-01

    This paper describes an approach to reduce nuclear plant outage duration and cost through partnership. Partnership is defined as a long-term commitment between the utility and the vendor with the objective of achieving shared business goals by maximizing the effectiveness of each party's resources. The elements of an effective partnership are described. Specific examples are given as to how partnership has worked in the effective performance of refueling outages. To gain the full benefits of a partnership, both parties must agree to share information, define the scope early, communicate goals and expectations, and identify boundaries for technical ownership. (author)

  10. Outage management

    International Nuclear Information System (INIS)

    Anonymous

    2006-01-01

    Since constructing Japan's first PWR plant, Mihama Unit 1, MHI has been working to upgrade its technologies. The ongoing goal is to provide PWR nuclear power plants with levels of reliability, safety, economy operation and maintainability unparalleled in the world market. To fulfill its obligations and responsibility as an integrated plant manufacturer in the nuclear industry, MHI keeps a close eye on every facility, component, device and sub-component from the viewpoint of its customers. Backed by its rich experience and advanced technology, MHI continues to enhance the safety, reliability and economy of nuclear plants introducing improvements at every level. MHI continues to develop and improve diagnostic and inspection technologies based on its more than 30 years of experience in inspection and servicing the major and auxiliary facilities within nuclear power plants. MHI secures the integrity of components by developing and deploying technologies to minimize the wear of components and to repair and replace parts either degraded by age or unduly susceptible to wear. MHI backs its development of these technologies with its comprehensive technical capabilities in the design of remote operation equipment and electro mechanics as well as its expertise in basic technologies such as welding and machining. Mitsubishi Heavy Industries, Ltd. is not only a PWR plant constructor, but also offers complete outage support and component services. In partnership with our customers, MHI is helping to reduce outage duration, radiation exposure and costs, by providing its state of the art engineering knowledge, advanced non-destructive examination, inspection, maintenance and repair technologies mentioned above. MHI is performing large equipment refurbishment such as Steam Generator Replacement, Reactor Vessel Head Replacement, LP/HP turbine replacement, and recently completed the first Core Internal Replacement in the world. The following activities are part of the outage

  11. Maintenance, outages and chemistry really can be compatible

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J.G.; Deaconescu, R. [Bruce Power, Tiverton, Ontario (Canada)

    2006-07-01

    'Full text:' In their address to the Canadian Nuclear Society, Bruce Power's Chemistry Design staff will describe how maintenance and outages can impact negatively on chemistry control and asset protection. Considerations of material impacts and material condition have significant influences on the approach to, and control of, chemistry. This applies equally to operation as it does during unit and/or system outages. Ideas will be presented as to how to facilitate making maintenance, outages and chemistry compatible. It will be shown how the lack of such an approach can lead to disastrous results. (author)

  12. Approach to shortening duration of nuclear plant refueling outage

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Yoshiharu; Nakanishi, Tooru [Mitsubishi Heavy Industries Ltd., Kobe (Japan). Kobe Shipyard and Machinery Works; Yoshihara, Seiichi; Kanbara, Masayuki; Yamanaka, Misao; Shimizu, Takeshi

    1998-07-01

    This paper summarizes the mission role of the MHI in-house project team for a shorter outage duration for PWR plants operating in Japan and its results. The major tasks of project team are benchmarking to develop outage performance goals, and develop recommendation packages for outage enhancement covering field procedures and tooling betterment. An optimization study for maintenance tasks was also carried out. This paper highlights the results of efforts the activities of the project team. (author)

  13. Elimination of maintenance outage and cost reduction by development of outage-free maintenance techniques

    International Nuclear Information System (INIS)

    Jakabe, Hideo; Maruyama, Yoshinaga

    1996-01-01

    The development program of KEPCO on outage-free maintenance techniques for distribution line work since 1984 is overviewed. It has succeeded in eliminating maintenance outages since 1989. The original aim was to improve customer satisfaction. However, in all, four benefits were realised through the development. These are cost reduction, securing of worker safety, improvement of customer service, and advancement of distribution techniques and morale in KEPCO. The introduction of robotic techniques for maintenance work and manipulator techniques for repair work is planned for further modernization. These new techniques are helping in both work safety and work efficiency improvement. Cost reduction and advancement of distribution line work techniques is also considered. (R.P.)

  14. On Outage Performance of Spectrum-Sharing Communication over M-Block Fading

    KAUST Repository

    Alabbasi, AbdulRahman

    2015-12-06

    In this paper, we consider a cognitive radio system in which a block-fading channel is assumed. Each transmission frame consists of M blocks and each block undergoes a different channel gain. Instantaneous channel state information about the interference links remains unknown to the primary and secondary users. We minimize the secondary user\\'s targeted outage probability over the block-fading channels. To protect the primary user, a statistical constraint on its targeted outage probability is enforced. The secondary user\\'s targeted outage region and the corresponding optimal power are derived. We also propose two sub-optimal power strategies and derive compact expressions for the corresponding outage probabilities. These probabilities are shown to be asymptotic lower and upper bounds on the outage probability. Utilizing these bounds, we derive the exact diversity order of the secondary user outage probability. Selected numerical results are presented to characterize the system\\'s behavior.

  15. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  16. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  17. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  18. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  19. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  20. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  1. Integrated use of Primavera and ORAM codes in outage 1999 at NPP Krsko

    International Nuclear Information System (INIS)

    Krajnc, J.; Skaler, F.; Basic, I.; Kocnar, R.

    1999-01-01

    The paper deals with the following postulated main goals of outage scheduling with Primavera tool at Krsko NPP: planning and controlling of resources (people, equipment, locations, sources), controlling the safety aspects of an outage and assuring defense-in-depth philosophy (through integrated safety assessment by ORAM code), diversity use of the plan during preparations period and outage progress (MCB, work leaders, management, planning Dept., subcontractors, support, etc.), allowing for optimization of outage duration. A snapshot in Primavera of what actually happened in outage 1999, lessons learned and a new work template is the scope of the next year outage.(author)

  2. Line outage contingency analysis including the system islanding scenario

    Energy Technology Data Exchange (ETDEWEB)

    Hazarika, D.; Bhuyan, S. [Assam Engineering College, Jalukbari, Guwahati 781013 (India); Chowdhury, S.P. [Jadavpur University, Jadavpur, Kolkata 700 032 (India)

    2006-05-15

    The paper describes an algorithm for determining the line outage contingency of a line taking into account of line over load effect in remaining lines and subsequent tripping of over loaded line(s) leading to possible system split or islanding of a power system. The optimally ordered sparse [B'], [B'] matrices for the integrated system are used for load flow analysis to determine modified values of voltage phase angles [{delta}] and bus voltages [V] to determine the over loading effect on the remaining lines due to outage of a selected line outage contingency. In case of over loading in remaining line(s), the over loaded lines are removed from the system and a topology processor is used to find the islands. A fast decoupled load flow (FDLF) analysis is carried out for finding out the system variables for the islanded (or single island) system by incorporating appropriate modification in the [B'] and [B'] matrices of the integrated system. Line outage indices based on line overload, loss of load, loss of generation and static voltage stability are computed to indicate severity of a line outage of a selected line. (author)

  3. Good practices for outage management in nuclear power plants

    International Nuclear Information System (INIS)

    1991-09-01

    As a follow-up to an earlier Technical Document on Good Practices for Improved Nuclear Power Plant Performance (IAEA-TECDOC-498), the Agency has produced a more focused technical report on good practices associated with nuclear power plant outage planning and execution. As with the earlier document, the overall aim is that by identifying good practices in the key aspects of outage management, overall world nuclear performance will improve and the gap between excellent performers and operators with developing programmes will be narrowed. This document has been produced through the contribution of numerous operators and government agencies. It aims at minimizing text and focusing on actual good practices in use which can be found in the annexes. While the specific methods used to achieve excellence in maintenance/refuelling outages may differ, the fundamental requirements of outage management are discussed

  4. Saving doses by outage planning strategy and architectural arrangements

    International Nuclear Information System (INIS)

    Wahlstroem, B.

    1993-01-01

    All radiation doses come out as a result of dose rate and exposure time, and the main part of the occupational exposure is caused during outages. While every reasonable attempt should be made to lower the dose rates, the other factor, the exposure time, may not be forgotten. The paper presents possible ways of saving man-hours in the controlled zone by outage planning strategy. And every saved man-hour means a saved radiation dose. At Loviisa NPS also some special architectural arrangements contribute to shortening the outage time, thus saving doses

  5. Outage performance of cognitive radio systems with Improper Gaussian signaling

    KAUST Repository

    Amin, Osama

    2015-06-14

    Improper Gaussian signaling has proved its ability to improve the achievable rate of the systems that suffer from interference compared with proper Gaussian signaling. In this paper, we first study impact of improper Gaussian signaling on the performance of the cognitive radio system by analyzing the outage probability of both the primary user (PU) and the secondary user (SU). We derive exact expression of the SU outage probability and upper and lower bounds for the PU outage probability. Then, we design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the proposed bounds and adaptive algorithms by numerical results.

  6. Long-term optimization of outage performance

    International Nuclear Information System (INIS)

    Huemmeler, Alexander; Jakobs, Norbert; Seifert, Siegfried

    2003-01-01

    Deregulation of the power markets and the accompanying pressure on electricity prices have forced all electric utilities to reduce their power generating costs in order to be able to hold their own in the new market environment. This has also particularly affected the operators of nuclear power plants since they have to compete against the lower power generating costs of fossil-fired combined-cycle power plants and, in Germany are faced with a difficult political climate. The areas identified as having the greatest cost-cutting potential were fuel costs, operating costs and measures to increase plant availability. The main objective behind increasing plant availability was not only to improve the already high standard of operational reliability and plant safety even further, but also to significantly shorten the downtime needed for annual refueling outages. A variety of measures aimed at shortening scheduled plant outages have thus been developed and successfully implemented by nuclear plant operators. At the same time, process improvements and new technologies have been introduced by the service providers. Both initiatives together have contributed towards substantially reducing outage time and cost. (author)

  7. Line outage contingency analysis including the system islanding ...

    African Journals Online (AJOL)

    The optimally ordered sparse [Bʹ], [Bʺ] matrices for the integrated system are used for load flow analysis to determine modified values of voltage phase angles [d] and bus voltages [V] to determine the over loading effect on the remaining lines due to outage of a selected line outage contingency. In case of over loading in ...

  8. Use of collaboration software to improve nuclear power plant outage management

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn

    2015-02-01

    Nuclear Power Plant (NPP) refueling outages create some of the most challenging activities the utilities face in both tracking and coordinating thousands of activities in a short period of time. Other challenges, including nuclear safety concerns arising from atypical system configurations and resource allocation issues, can create delays and schedule overruns, driving up outage costs. Today the majority of the outage communication is done using processes that do not take advantage of advances in modern technologies that enable enhanced communication, collaboration and information sharing. Some of the common practices include: runners that deliver paper-based requests for approval, radios, telephones, desktop computers, daily schedule printouts, and static whiteboards that are used to display information. Many gains have been made to reduce the challenges facing outage coordinators; however; new opportunities can be realized by utilizing modern technological advancements in communication and information tools that can enhance the collective situational awareness of plant personnel leading to improved decision-making. Ongoing research as part of the Light Water Reactor Sustainability Program (LWRS) has been targeting NPP outage improvement. As part of this research, various applications of collaborative software have been demonstrated through pilot project utility partnerships. Collaboration software can be utilized as part of the larger concept of Computer-Supported Cooperative Work (CSCW). Collaborative software can be used for emergent issue resolution, Outage Control Center (OCC) displays, and schedule monitoring. Use of collaboration software enables outage staff and subject matter experts (SMEs) to view and update critical outage information from any location on site or off.

  9. Assessing energy supply security: Outage costs in private households

    International Nuclear Information System (INIS)

    Praktiknjo, Aaron J.; Hähnel, Alexander; Erdmann, Georg

    2011-01-01

    The objective of this paper is to contribute to the topic of energy supply security by proposing a Monte Carlo-based and a survey based model to analyze the costs of power interruptions. Outage cost estimations are particularly important when deciding on investments to improve supply security (e.g. additional transmission lines) in order to compare costs to benefits. But also other policy decisions on measures that have direct or indirect consequences for the supply security (e.g. a phasing out of nuclear energy) need to be based on results from outage cost estimations. The main focus of this paper lies with residential consumers, but the model is applied to commercial, industrial and governmental consumers as well. There are limited studies that have approached the problem of evaluating outage cost. When comparing the results of these studies, they often display a high degree of diversification. As consumers have different needs and dependencies towards the supply of electricity because of varying circumstances and preferences, a great diversity in outage cost is a logical consequence. To take the high degree of uncertainties into account, a Monte Carlo simulation was conducted in this study for the case of private households in Germany. - Highlights: ► A macroeconomic model to assess outage cost is proposed. ► Possibilities for substitution are considered by analyzing individual preferences for the time-use. ► Uncertainties are taken into account by using a Monte Carlo simulation. ► This study reveals the distribution of outage costs to different electricity consumers. ► Implications for energy policy decisions are discussed.

  10. Balance-of-plant outage availability study. Phase I. Extension report

    International Nuclear Information System (INIS)

    Thomasson, F.R.

    1978-09-01

    After completion of the Phase 1 Refueling Outage Availability Study, Babcock and Wilcox and the U.S. Department of Energy entered into a supplemental agreement to perform a balance-of-plant maintenance, inspection, and test study with the cooperation of Duke Power Company and Arkansas Power and Light Company. The objectives were (1) to expand the Phase 1 data base, including balance-of-plant activities, to reduce outage time and increase plant availability and (2) to conduct an onsite review of plant maintenance, practices to complement the utility efforts in reducing outage time and increasing on-line operational time. Data were obtained from (1) observations during the 1977 refueling outage at Oconee 3, (2) review of maintenance practices during the Arkansas Nuclear One, Unit 1, operational cycle in 1977, and (3) selected observations of the 1978 refueling outage at ANO-1. Accumulated data were then reviewed and analyzed to produce a list of improvement recommendations for Oconee 3 and ANO-1 that can be generically applied to plants of similar design and construction

  11. Underlay Cognitive Radio Systems with Improper Gaussian Signaling: Outage Performance Analysis

    KAUST Repository

    Amin, Osama

    2016-03-29

    Improper Gaussian signaling has the ability over proper (conventional) Gaussian signaling to improve the achievable rate of systems that suffer from interference. In this paper, we study the impact of using improper Gaussian signaling on the performance limits of the underlay cognitive radio system by analyzing the achievable outage probability of both the primary user (PU) and secondary user (SU). We derive the exact outage probability expression of the SU and construct upper and lower bounds of the PU outage probability which results in formulating an approximate expression of the PU outage probability. This allows us to design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the derived expressions for both the SU and the PU and the corresponding adaptive algorithms by numerical results.

  12. Underlay Cognitive Radio Systems with Improper Gaussian Signaling: Outage Performance Analysis

    KAUST Repository

    Amin, Osama; Abediseid, Walid; Alouini, Mohamed-Slim

    2016-01-01

    Improper Gaussian signaling has the ability over proper (conventional) Gaussian signaling to improve the achievable rate of systems that suffer from interference. In this paper, we study the impact of using improper Gaussian signaling on the performance limits of the underlay cognitive radio system by analyzing the achievable outage probability of both the primary user (PU) and secondary user (SU). We derive the exact outage probability expression of the SU and construct upper and lower bounds of the PU outage probability which results in formulating an approximate expression of the PU outage probability. This allows us to design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the derived expressions for both the SU and the PU and the corresponding adaptive algorithms by numerical results.

  13. Planning and management of outages in nuclear power plants

    International Nuclear Information System (INIS)

    Sica, G.F.; Fusari, W.; Reginelli, A.

    1984-01-01

    At present the Ente Nazionale per l'Energia Elettrica (ENEL) operates three nuclear power plants, only one of which belongs to the new generation, i.e. the Caorso Nuclear Power Plant which has been in commercial operation since December 1981. Outage planning, implementation and analysis are very important in order to minimize the shutdown time and thus improve plant availability, which is of particular importance for a large nuclear power plant. Such activities are very complicated because of the large number of jobs that have to be performed in accordance with detailed written procedures and which have to be properly documented and controlled. Large off-site resources are required which have to be accurately interfaced with on-site staff. The ENEL is making a great effort to define both the administrative and technical aspects of refuelling outages. As outage planning requires the availability and handling of a large amount of data and information, a maintenance information system that has been widely used in conventional plants was applied, with some modifications made especially for the Caorso Nuclear Power Plant. After two years the following results have been achieved: a large number of raw and processed data are now available, the first refuelling outage was carried out with few problems and according to schedule, and the second refuelling outage, based on the experience of the first, required somewhat less preparation and is developing well even though many special activities have had to be scheduled. The ENEL believes that the efforts made in the planning and management areas will pay off in terms of the short duration, smoothness and economy of further outages, both for Caorso and for future plants. (author)

  14. Estimating Power Outage Cost based on a Survey for Industrial Customers

    Science.gov (United States)

    Yoshida, Yoshikuni; Matsuhashi, Ryuji

    A survey was conducted on power outage cost for industrial customers. 5139 factories, which are designated energy management factories in Japan, answered their power consumption and the loss of production value due to the power outage in an hour in summer weekday. The median of unit cost of power outage of whole sectors is estimated as 672 yen/kWh. The sector of services for amusement and hobbies and the sector of manufacture of information and communication electronics equipment relatively have higher unit cost of power outage. Direct damage cost from power outage in whole sectors reaches 77 billion yen. Then utilizing input-output analysis, we estimated indirect damage cost that is caused by the repercussion of production halt. Indirect damage cost in whole sectors reaches 91 billion yen. The sector of wholesale and retail trade has the largest direct damage cost. The sector of manufacture of transportation equipment has the largest indirect damage cost.

  15. The Role of Occupational Health and Safety in Complex Outage Services to NPPs

    International Nuclear Information System (INIS)

    Rozman, A.; Androjna, A.

    2010-01-01

    Meeting outage schedules in NPPs which are increasingly demanding, apart from all other aspects, introduces a new perspective on occupational health and safety (OHS). Not only is the OHS a constituent part of a plant's overall outage management, it above all dictates paramount objectives to outage service providers. The paper reviews the impacts of reductions of outage durations on OHS and presents related experience of the leading Slovenian outage services provider, NUMIP d.o.o. over the last ten years. The company is now getting prepared for its 12th outage at Krsko NPP in 2010, and has not have recorded a major injury so far, even though these projects engaged over 450 people at a time on-site. To achieve such results, a lot of emphasis is being put onto OHS management prior to and during outages. A certified OHSAS 18001 system has been established and implemented to further support preparation and execution of NUMIP's outage activities at Krsko NPP, and also for other projects. An effective continuous improvement system is built into the project, providing for implementation of lessons learned from domestic and foreign plants. To illustrate the topic in more detail, a case on a Seismic protection of polar crane project is presented. It took place in the 2009 Outage and has certainly been one of the most demanding projects from the OHS point of view for NUMIP so far. The paper aims at contributing to a better understanding of the role of effective management of OHS on the side of a service provider, and, consequently, in the overall outage success of a plant.(author).

  16. Outage Risk Assessment and Management (ORAM) thermal-hydraulics toolkit

    International Nuclear Information System (INIS)

    Denny, V.E.; Wassel, A.T.; Issacci, F.; Pal Kalra, S.

    2004-01-01

    A PC-based thermal-hydraulic toolkit for use in support of outage optimization, management and risk assessment has been developed. This mechanistic toolkit incorporates simple models of key thermal-hydraulic processes which occur during an outage, such as recovery from or mitigation of outage upsets; this includes heat-up of water pools following loss of shutdown cooling, inadvertent drain down of the RCS, boiloff of coolant inventory, heatup of the uncovered core, and reflux cooling. This paper provides a list of key toolkit elements, briefly describes the technical basis and presents illustrative results for RCS transient behavior during reflux cooling, peak clad temperatures for an uncovered core and RCS response to loss of shutdown cooling. (author)

  17. Activities of maintenance and outage

    International Nuclear Information System (INIS)

    Gracia-Orellan, J. M.; Gonzalez, P. L.; Verdu, M. F.; Fernandez, J. A.

    2004-01-01

    Iberinco Nuclear Generation Department have wanted to promote service activities in nuclear power plants for years besides its dedication to engineering activities. for it, in 1997 Nuclear Services Management was created to complement engineering activities and to be able to make an offer for products and turn key services. People involved in this Management have an extensive experience in Services Area, so that all type of maintenance works are promoted, as well other services like dismantling, fallout management and new equipment's for nuclear power plants services. Iberinco's experience in Support Services in Nuclear Power Plants allows to answer effectively to special workers during operation cycle and outages periods. These activities have been made in spanish nuclear power plants and Angra I and II plants, both of them in Brazil. In this area we provide Technical Consulting Management and Supervision to develop the following activities: - Improvement Maintenance Programs based in PSA: Implantation of Maintenance Rule in the plants. - Supervision and Assembly of design modifications in structures, systems and components. - Fulfilment of efficiency tests, inspection and turbo-group modification. - Noise and vibrations analysis. - Valves and rotative equipment calculations and diagnosis tests. Iberinco develop these outage activities itself or as contractors coordinator under its management. A lot of them have been working with Iberinco for many years and have a great experience in the Service Area they are developing. In this article, the main outage activities developed for Iberinco are detailed. (Author)

  18. Balance-of-plant outage availability study. Phase I. Extension report. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    Thomasson, F.R.

    1978-09-01

    After completion of the Phase 1 Refueling Outage Availability Study, Babcock and Wilcox and the U.S. Department of Energy entered into a supplemental agreement to perform a balance-of-plant maintenance, inspection, and test study with the cooperation of Duke Power Company and Arkansas Power and Light Company. The objectives were (1) to expand the Phase 1 data base, including balance-of-plant activities, to reduce outage time and increase plant availability and (2) to conduct an onsite review of plant maintenance, practices to complement the utility efforts in reducing outage time and increasing on-line operational time. Data were obtained from (1) observations during the 1977 refueling outage at Oconee 3, (2) review of maintenance practices during the Arkansas Nuclear One, Unit 1, operational cycle in 1977, and (3) selected observations of the 1978 refueling outage at ANO-1. Accumulated data were then reviewed and analyzed to produce a list of improvement recommendations for Oconee 3 and ANO-1 that can be generically applied to plants of similar design and construction.

  19. Seasonal and Local Characteristics of Lightning Outages of Power Distribution Lines in Hokuriku Area

    Science.gov (United States)

    Sugimoto, Hitoshi; Shimasaki, Katsuhiko

    The proportion of the lightning outages in all outages on Japanese 6.6kV distribution lines is high with approximately 20 percent, and then lightning protections are very important for supply reliability of 6.6kV lines. It is effective for the lightning performance to apply countermeasures in order of the area where a large number of the lightning outages occur. Winter lightning occurs in Hokuriku area, therefore it is also important to understand the seasonal characteristics of the lightning outages. In summer 70 percent of the lightning outages on distribution lines in Hokuriku area were due to sparkover, such as power wire breakings and failures of pole-mounted transformers. However, in winter almost half of lightning-damaged equipments were surge arrester failures. The number of the lightning outages per lightning strokes detected by the lightning location system (LLS) in winter was 4.4 times larger than that in summer. The authors have presumed the occurrence of lightning outages from lightning stroke density, 50% value of lightning current and installation rate of lightning protection equipments and overhead ground wire by multiple regression analysis. The presumed results suggest the local difference in the lightning outages.

  20. Estimating the Propagation of Interdependent Cascading Outages with Multi-Type Branching Processes

    Energy Technology Data Exchange (ETDEWEB)

    Qi, Junjian; Ju, Wenyun; Sun, Kai

    2016-01-01

    In this paper, the multi-type branching process is applied to describe the statistics and interdependencies of line outages, the load shed, and isolated buses. The offspring mean matrix of the multi-type branching process is estimated by the Expectation Maximization (EM) algorithm and can quantify the extent of outage propagation. The joint distribution of two types of outages is estimated by the multi-type branching process via the Lagrange-Good inversion. The proposed model is tested with data generated by the AC OPA cascading simulations on the IEEE 118-bus system. The largest eigenvalues of the offspring mean matrix indicate that the system is closer to criticality when considering the interdependence of different types of outages. Compared with empirically estimating the joint distribution of the total outages, good estimate is obtained by using the multitype branching process with a much smaller number of cascades, thus greatly improving the efficiency. It is shown that the multitype branching process can effectively predict the distribution of the load shed and isolated buses and their conditional largest possible total outages even when there are no data of them.

  1. Questions and perceptions about nuclear power plant outages

    International Nuclear Information System (INIS)

    Mc Donald, R.P.

    1985-01-01

    The most commonly used measure of nuclear power plant productivity is ''availability'' which is usually construed to be the percentage of time in a given period that a nuclear unit is actually tied to a grid supplying electrical power. When a unit is not tied to a grid, it is in an ''outage'' condition, possibly being shutdown, refueled, repaired, or in some stage of startup. There are some very positive by-products of well performed outages in addition to cost and availability enhancements: almost all supervisory and engineering personnel participate in planning and preparations. This approach promotes the professional and leadership development of each person, the supervisors and engineers participate in a competitive venture as a team and enjoy and benefit from comparative interactions with other utilities, perhaps the greatest benefit reaped from the development of outage management expertise is the improved ability to handle unexpected plant problems

  2. World class performance: the outage/operating cycle continuum

    Energy Technology Data Exchange (ETDEWEB)

    Remphal, M. [Ontario Power Generation, Darlington, Ontario (Canada)

    2011-07-01

    It's all about Performance! Predictable and sustainable high performance is the key to public and stakeholder confidence in the nuclear industry. Why? Because nuclear is unique and safe, reliable operation each and every day is required to keep public trust. What better way to demonstrate this predictability than in breaker to breaker operating runs? Delivering on what was promised is the essence of our OPG accountability model: 'Say it, Do it'. This presentation is drawn from practical experience gained during the most recent planned maintenance outages at Darlington Nuclear. Key elements for outage success that will be discussed include; Human Performance: Ensuring each action is deliberate and executed right the first time; Continuous Learning: Recent examples demonstrating how drawing from lessons learned and operating experience worldwide can dramatically improve outage performance; Teamwork and Partnership: Recognizing our industry is too complex for a single; individual or organization to run on its own; Scope Selection: Darlington currently has an industry leading 0.5% Forced Loss Rate (FLR). If right work is selected and executed at the right time then ultimately the plant speaks and it shows up in low FLR and high Nuclear Performance Index; Planning: Ask and anticipate what can go wrong, what options exist and then pre-decide what path you would take. Some practical tools will be provided which have been recently used to plan out surprises; Oversight: An outage left to run its own course will have a surprise outcome. Strong management oversight is required to meet the goals of outage execution. Tips on how to improve communication and accountability will be discussed. Trust is built on confidence and confidence is built on sustainable performance. World class sustainable performance requires using all the tools available. This discussion will provide insight on these very tools. (author)

  3. World class performance: the outage/operating cycle continuum

    International Nuclear Information System (INIS)

    Remphal, M.

    2011-01-01

    It's all about Performance! Predictable and sustainable high performance is the key to public and stakeholder confidence in the nuclear industry. Why? Because nuclear is unique and safe, reliable operation each and every day is required to keep public trust. What better way to demonstrate this predictability than in breaker to breaker operating runs? Delivering on what was promised is the essence of our OPG accountability model: 'Say it, Do it'. This presentation is drawn from practical experience gained during the most recent planned maintenance outages at Darlington Nuclear. Key elements for outage success that will be discussed include; Human Performance: Ensuring each action is deliberate and executed right the first time; Continuous Learning: Recent examples demonstrating how drawing from lessons learned and operating experience worldwide can dramatically improve outage performance; Teamwork and Partnership: Recognizing our industry is too complex for a single; individual or organization to run on its own; Scope Selection: Darlington currently has an industry leading 0.5% Forced Loss Rate (FLR). If right work is selected and executed at the right time then ultimately the plant speaks and it shows up in low FLR and high Nuclear Performance Index; Planning: Ask and anticipate what can go wrong, what options exist and then pre-decide what path you would take. Some practical tools will be provided which have been recently used to plan out surprises; Oversight: An outage left to run its own course will have a surprise outcome. Strong management oversight is required to meet the goals of outage execution. Tips on how to improve communication and accountability will be discussed. Trust is built on confidence and confidence is built on sustainable performance. World class sustainable performance requires using all the tools available. This discussion will provide insight on these very tools. (author)

  4. Excellence through outage planning and scheduling

    International Nuclear Information System (INIS)

    Ferriole, G.

    1987-01-01

    The Nuclear and Fossil Generation Division of Electricite de France (EdF) has been the largest nuclear plant operating utility in France since 1984. The size of the units, their standardization, and extensive operating experience were favorable parameters leading to the development of a very complete maintenance organization. Electricite de France believes in the importance of well-defined maintenance concepts. These maintenance concepts contribute to outage performance by requiring a careful consideration of work to be done and by defining the techniques and means of accomplishing this work. In addition to maintenance concepts and careful planning and scheduling, good outage management is achieved through the motivation and dedication of the people involved. It is the key to good operational results

  5. The four ''Ps'' of outage management

    International Nuclear Information System (INIS)

    Kuehn, S.E.

    1996-01-01

    This article describes how planning, partnering, preparation and people prevent poor outage performance. Boasting the best production costs in a decade, the US fleet of nuclear reactors is performing better than ever. Industry wide, production costs fell 7% to $20.02 per net megawatt hour (MWh) and output climbed 3% to 634million MWh. It doesn't take a nuclear physicists to realize that when base-loaded nuclear units are operated for long periods of time, near their technical potential, costs will fall and relative performance improves. Statistics for 1994 compiled by the Institute of Nuclear Operations (INPO) and the World Association of Nuclear Operators (WANO) showed the industry has steadily improved in most of the 10 industry-recognized categories. In 1994, Unit Capability Factor (the percentage of maximum energy generation a plant can supply to the grid) reached just under 82%, beating the 1995 goal and proving just how far the industry has come (62.7% in 1980) when improving plant operations

  6. Verification and Enhancement of VIIRS Day-Night Band Power Outage Detection Product

    Science.gov (United States)

    Burke, A.; Schultz, L. A.; Omitaomu, O.; Molthan, A.; Cole, T.; Griffin, R.

    2017-12-01

    The NASA SPoRT (Short-term Prediction Research and Transition) Center has collaborated with scientists at NASA Goddard Space Flight Center to create a power outage detection product from radiance data obtained by the VIIRS (Visible Infrared Imaging Radiometer Suite) sensor aboard the Suomi-NPP satellite. This product uses a composite of pre-event radiance values from the VIIRS Day-Night Band to establish a baseline of "normal" nighttime lights for a study area. Then, after a severe weather event or other disaster, post-event images are compared to the composite to generate a percent-of-normal radiance product to identify areas that are experiencing outages and to aid in disaster response and monitor recovery. This project will use ground-truth county-level outage data provided by Oak Ridge National Laboratory (ORNL) in order validate the product and to establish a percent-of-normal threshold for identifying power outages. Once a threshold is found, ORNL's LandScan Global population data will be combined with the product to estimate how many electrical customers are being affected by power outages after a disaster. Two case studies will be explored to examine power outage recovery after severe weather events, including Hurricane Matthew from 2016 and the Washington D.C. Derecho event of 2012.

  7. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  8. Options for shortening nuclear power plant refueling outages

    International Nuclear Information System (INIS)

    Kastl, H.

    2001-01-01

    Deregulation of the European electricity market on 01.01.1999 forced a large number of electric utilities- especially nuclear power plant operators - to find ways of drastically cutting down their costs in order to be able to compete successfully within the new market environment. Nuclear power plants currently in operation mainly have three potential ways of reducing their power generating costs: by increasing plant availability, reducing fuel costs and cutting down operating costs. The optimization of plant refueling outages offers considerable potential for enhancing plant availability, but also helps bring down operating costs by reducing expenditure on maintenance. In order to optimize an outage in terms of its duration and costs, a variety of approaches are possible - all of which, however, involve certain key factors such as good organization, planning, logistics and control, improvement of equipment and tools, as well as motivation of personnel. Another aspect is the introduction of innovative technologies. In the last few years, such technologies have frequently enabled maintenance effort to be reduced, thus saving considerable time, and have also resulted in a need for fewer personnel to carry out the work, thus reducing radiation exposure. In many instances they have also improved the quality of work and outage performance as a whole. The paper uses recent examples to show how innovative technologies can contribute to-wards reducing nuclear plant maintenance costs and shorten the duration of refueling out-ages. (author)

  9. Does Your Domestic Photovoltaic Energy System Survive Grid Outages?

    Directory of Open Access Journals (Sweden)

    Marijn R. Jongerden

    2016-09-01

    Full Text Available Domestic renewable energy systems, including photovoltaic energy generation, as well as local storage, are becoming increasingly popular and economically feasible, but do come with a wide range of options. Hence, it can be difficult to match their specification to specific customer’s needs. Next to the usage-specific demand profiles and location-specific production profiles, local energy storage through the use of batteries is becoming increasingly important, since it allows one to balance variations in production and demand, either locally or via the grid. Moreover, local storage can also help to ensure a continuous energy supply in the presence of grid outages, at least for a while. Hybrid Petri net (HPN models allow one to analyze the effect of different battery management strategies on the continuity of such energy systems in the case of grid outages. The current paper focuses on one of these strategies, the so-called smart strategy, that reserves a certain percentage of the battery capacity to be only used in case of grid outages. Additionally, we introduce a new strategy that makes better use of the reserved backup capacity, by reducing the demand in the presence of a grid outage through a prioritization mechanism. This new strategy, called power-save, only allows the essential (high-priority demand to draw from the battery during power outages. We show that this new strategy outperforms previously-proposed strategies through a careful analysis of a number of scenarios and for a selection of survivability measures, such as minimum survivability per day, number of survivable hours per day, minimum survivability per year and various survivability quantiles.

  10. Practice of fuel management and outage strategy at Paks NPP

    International Nuclear Information System (INIS)

    Farago, P.; Hamvas, I.; Szecsenyi, Zs.; Nemes, I.; Javor, E.

    2000-01-01

    The Paks Nuclear Power Plant generates almost 40% of Hungarian electricity production at lowest price. In spite of this fact the reduction of operational and maintenance costs is one of the most important goal of the plant management. The proper fuel management and outage strategy can give a considerable influence for this cost reduction. The aim of loading pattern planning is to get the required cycle length with available fuel cassettes and to keep all key parameters of safety analysis under safety limits. Another important point is production at profit, where both the fuel and spent fuel cost are determining. Earlier the conditions given by our only fuel supplier restricted our possibilities, so at the beginning the fuel arrangement changing was the only way to improve efficiency of fuel using. As first step we introduced the low leakage core design. The next step was the 4 years cycle using of some cassettes. By this way nearly half of 3 years cycle old cassettes remained in the core for fourth cycle. In the immediate future we want to use profiled cassettes developed by Russian supplier. Simultaneously we will load new type of WWER cassettes with burnable poison developed by BNFL Company. Hereby we can apply more BNFL cassettes for four years cycle even more. Both cost of fuel and number of spent fuel can be reduced besides keeping parameters under safety limits. The Hungarian in service inspection rules determine that every four year we have to make a complete inspection of reactor vessel. Therefore earlier we had two types of outages. Every 4 years we planned a long outage with 55-65 days duration and normal ones with about 30-35 days duration between the long ones. During the normal outages this way did not give us enough room to utilise the shortest possible critical path determined by works on reactor. Some years ago we changed our outage strategy. Now we plan every 4 years a long outage, and between them one normal and two short ones. As a result the

  11. Impacts of organization and management on outage performance

    International Nuclear Information System (INIS)

    Huang Yuhao; Cheng, S.-K.

    2004-01-01

    From probabilistic safety assessments and root cause analyses for incidents/accidents, the risk at refueling outage has recently been recognized to be comparable to (or even more significant than) the commonly evaluated risk at power in a Nuclear Power Plant (NPP). This paper summarizes the major findings in the aspect of 'organization and management', which is identified to have significant impacts on outage performance in the qualitative assessment of a PWR plant. In order to reduce the potential risk arisen from those identified imperfections, the corresponding suggestions are also proposed. (author)

  12. Development of an Overview Display to Allow Advanced Outage Control Center Management to Quickly Evaluate Outage Status

    Energy Technology Data Exchange (ETDEWEB)

    St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hugo, Jacques Victor [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-09-01

    This report describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations.

  13. Final Remediation Report for the K-Area Bingham Pump Outage Pit (643-1G); FINAL

    International Nuclear Information System (INIS)

    Morganstern, M.

    2002-01-01

    The K-Area Bingham Pump Outage Pit (K BPOP) Building Number 643-1G, is situated immediately south and outside the K-Reactor fence line and is approximately 400 feet in length and 60 feet in width. For the K BPOP operable unit, the Land Use Control (LUC) objectives are to prevent contact, removal, or excavation of buried waste in the area and to preclude residential use of the area

  14. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    Kashiwazaki-Kariwa Nuclear Power Station Units Nos. 6 and 7, the world's first ABWRs (Advanced Boiling Water Reactor), started commercial operation on November 7, 1996 and July 2, 1997, respectively, and continued their commercial operation with a high capacity factor, low occupational radiation exposure and radioactive waste. Units 6 and 7 were in their 3rd cycle operation until 25th April 1999 and 1st November 1999, respectively. Thermal efficiency was 35.4-35.8% (design thermal efficiency: 34.5%) during these period, demonstrating better performance than that of BWR-5 (design thermal efficiency: 33.4%). Nos. 6 and 7 have experienced 2 annual outages. The first outage of unit No. 6 started on November 20, 1997 and was completed within 61 days (including 6 New Year holidays), and the second outage started on March 13, 1999 and was completed within 44 days. The first annual outage of unit No. 7 started on May 27, 1998, earlier than it would normally have been, to avoid an annual outage during the summer, and was completed within 55 days, and the second outage started on September 18th, 1999 and was completed within 45 days, All annual outages were carried out within a very short time period without any severe malfunctions, including newly designed ABWR systems and equipment. As the first outage in Japan, 55 days is a very short period, despite the fact that the Nos. 6 and 7 are the first ABWRs in the world and the largest capacity units in Japan. The total occupational radiation exposure of No. 6 was 300 man-mSv (1st outage) and 331 man-mSv (2nd outage). That of Unit 7 was 153 man-mSv (1st outage) Those of unit No. 6 were at the same level as those of unit No. 3, which is the latest design 1100MW(e) BWR-5. That of unit No. 7 was the lowest ever at Kashiwazaki-Kariwa nuclear power station. The drums of radioactive waste discharged during the annual outage numbered 54 (1st outage) for No. 6 and 62 (1st outage) for No. 7, which was less than the design target of 100

  15. Hybrid Cascading Outage Analysis of Extreme Events with Optimized Corrective Actions

    Energy Technology Data Exchange (ETDEWEB)

    Vallem, Mallikarjuna R.; Vyakaranam, Bharat GNVSR; Holzer, Jesse T.; Samaan, Nader A.; Makarov, Yuri V.; Diao, Ruisheng; Huang, Qiuhua; Ke, Xinda

    2017-10-19

    Power system are vulnerable to extreme contingencies (like an outage of a major generating substation) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Some cascading outages are seen within minutes following a major contingency, which may not be captured exclusively using the dynamic simulation of the power system. The utilities plan for contingencies either based on dynamic or steady state analysis separately which may not accurately capture the impact of one process on the other. We address this gap in cascading outage analysis by developing Dynamic Contingency Analysis Tool (DCAT) that can analyze hybrid dynamic and steady state behavior of the power system, including protection system models in dynamic simulations, and simulating corrective actions in post-transient steady state conditions. One of the important implemented steady state processes is to mimic operator corrective actions to mitigate aggravated states caused by dynamic cascading. This paper presents an Optimal Power Flow (OPF) based formulation for selecting corrective actions that utility operators can take during major contingency and thus automate the hybrid dynamic-steady state cascading outage process. The improved DCAT framework with OPF based corrective actions is demonstrated on IEEE 300 bus test system.

  16. Outage performance of reactive cooperation in Nakagami-m fading channels

    KAUST Repository

    Benjillali, Mustapha

    2010-06-01

    In this paper, we investigate the outage performance of Decode-and-Forward with reactive relaying in dual-hop cooperetive Nakagaml-m fading links. The destination, based on the umque knowledge of local second hop channel state information, selects the best relay to increase the chances of cooperation when the direct link is also available. After deriving the exact distribution of the variables of interest, the outage probability of the system - with and without the direct link - is obtained in closed-form, and the ε-outage capacity is derived in the particular c.se wh.ere the channel model is reduced to a Rayleigh fading. Simulation results confirm the accuracy of our analysis for a large selection of system and fading parameters.

  17. Understanding the Benefits of Dispersed Grid-Connected Photovoltaics: From Avoiding the Next Major Outage to Taming Wholesale Power Markets

    International Nuclear Information System (INIS)

    Letendre, Steven E.; Perez, Richard

    2006-01-01

    Thanks to new solar resource assessment techniques using cloud cover data available from geostationary satellites, it is apparent that grid-connected PV installations can serve to enhance electric grid reliability, preventing or hastening recovery from major power outages and serving to mitigate extreme price spikes in wholesale energy markets. (author)

  18. Wolsong Unit 1 restart chemistry procedures during retubing outage

    International Nuclear Information System (INIS)

    Yun, Hyunran; Lee, Sarang; Moon, Yunyong; Kim, Seoyul

    2015-01-01

    Lay-up is aimed at protecting systems from degradation during outage, mainly by minimizing corrosion and particularly, when the outage is longer than 16 weeks. Due to the intrinsic design of CANDU reactors, their horizontal fuel channels should be replaced for another service life time. This poster presents the lay-up guidelines and methods recommended for re-tubing outage based on the first re-tubing operation made in Korea (at the Wolsung Unit 1). It is shown that dry lay-up with specific gas blanket was the sole choice for the primary heat transfer system, the moderator system and the steam cycle system while wet lay-up under circulation was recommended for the end shield cooling system and the liquid zone control system. The water filled part of steam generators, of the liquid zone control system and of the end shield cooling system was maintained normal

  19. Outage Analysis of Spectrum-Sharing over M-Block Fading with Sensing Information

    KAUST Repository

    Alabbasi, Abdulrahman

    2016-07-13

    Future wireless technologies, such as, 5G, are expected to support real-time applications with high data throughput, e.g., holographic meetings. From a bandwidth perspective, cognitive radio is a promising technology to enhance the system’s throughput via sharing the licensed spectrum. From a delay perspective, it is well known that increasing the number of decoding blocks will improve the system robustness against errors, while increasing the delay. Therefore, optimally allocating the resources to determine the tradeoff of tuning the length of decoding blocks while sharing the spectrum is a critical challenge for future wireless systems. In this work, we minimize the targeted outage probability over the block-fading channels while utilizing the spectrum-sharing concept. The secondary user’s outage region and the corresponding optimal power are derived, over twoblocks and M-blocks fading channels. We propose two suboptimal power strategies and derive the associated asymptotic lower and upper bounds on the outage probability with tractable expressions. These bounds allow us to derive the exact diversity order of the secondary user’s outage probability. To further enhance the system’s performance, we also investigate the impact of including the sensing information on the outage problem. The outage problem is then solved via proposing an alternating optimization algorithm, which utilizes the verified strict quasiconvex structure of the problem. Selected numerical results are presented to characterize the system’s behavior and show the improvements of several sharing concepts.

  20. Outage Analysis of Spectrum-Sharing over M-Block Fading with Sensing Information

    KAUST Repository

    Alabbasi, Abdulrahman; Rezki, Zouheir; Shihada, Basem

    2016-01-01

    on the outage probability with tractable expressions. These bounds allow us to derive the exact diversity order of the secondary user’s outage probability. To further enhance the system’s performance, we also investigate the impact of including the sensing

  1. Spatial generalized linear mixed models of electric power outages due to hurricanes and ice storms

    International Nuclear Information System (INIS)

    Liu Haibin; Davidson, Rachel A.; Apanasovich, Tatiyana V.

    2008-01-01

    This paper presents new statistical models that predict the number of hurricane- and ice storm-related electric power outages likely to occur in each 3 kmx3 km grid cell in a region. The models are based on a large database of recent outages experienced by three major East Coast power companies in six hurricanes and eight ice storms. A spatial generalized linear mixed modeling (GLMM) approach was used in which spatial correlation is incorporated through random effects. Models were fitted using a composite likelihood approach and the covariance matrix was estimated empirically. A simulation study was conducted to test the model estimation procedure, and model training, validation, and testing were done to select the best models and assess their predictive power. The final hurricane model includes number of protective devices, maximum gust wind speed, hurricane indicator, and company indicator covariates. The final ice storm model includes number of protective devices, ice thickness, and ice storm indicator covariates. The models should be useful for power companies as they plan for future storms. The statistical modeling approach offers a new way to assess the reliability of electric power and other infrastructure systems in extreme events

  2. Estimating the spatial distribution of power outages during hurricanes in the Gulf coast region

    International Nuclear Information System (INIS)

    Han, S.-R.; Guikema, Seth D.; Quiring, Steven M.; Lee, Kyung-Ho; Rosowsky, David; Davidson, Rachel A.

    2009-01-01

    Hurricanes have caused severe damage to the electric power system throughout the Gulf coast region of the US, and electric power is critical to post-hurricane disaster response as well as to long-term recovery for impacted areas. Managing power outage risk and preparing for post-storm recovery efforts requires accurate methods for estimating the number and location of power outages. This paper builds on past work on statistical power outage estimation models to develop, test, and demonstrate a statistical power outage risk estimation model for the Gulf Coast region of the US. Previous work used binary hurricane-indicator variables representing particular hurricanes in order to achieve a good fit to the past data. To use these models for predicting power outages during future hurricanes, one must implicitly assume that an approaching hurricane is similar to the average of the past hurricanes. The model developed in this paper replaces these indicator variables with physically measurable variables, enabling future predictions to be based on only well-understood characteristics of hurricanes. The models were developed using data about power outages during nine hurricanes in three states served by a large, investor-owned utility company in the Gulf Coast region

  3. Outage Performance of Flexible OFDM Schemes in Packet-Switched Transmissions

    Directory of Open Access Journals (Sweden)

    Romain Couillet

    2009-01-01

    Full Text Available α-OFDM, a generalization of the OFDM modulation, is proposed. This new modulation enhances the outage capacity performance of bursty communications. The α-OFDM scheme is easily implementable as it only requires an additional time symbol rotation after the IDFT stage and a subsequent phase rotation of the cyclic prefix. The physical effect of the induced rotation is to slide the DFT window over the frequency spectrum. When successively used with different angles α at the symbol rate, α-OFDM provides frequency diversity in block fading channels. Interestingly, simulation results show a substantial gain in terms of outage capacity and outage BER in comparison with classical OFDM modulation schemes. The framework is extended to multiantenna and multicellular OFDM-based standards. Practical simulations, in the context of 3GPP-LTE, called hereafter α-LTE, sustain our theoretical claims.

  4. On test and maintenance: Optimization of allowed outage time

    International Nuclear Information System (INIS)

    Mavko, B.; Cepin, M.T.

    2000-01-01

    Probabilistic Safety Assessment is widely becoming standard method for assessing, maintaining, assuring and improving the nuclear power plant safety. To achieve one of its many potential benefits, the optimization of allowed outage time specified in technical specifications is investigated. Proposed is the risk comparison approach for evaluation of allowed outage time. The risk of shutting the plant down due to failure of certain equipment is compared to the risk of continued plant operation with the specified equipment down. The core damage frequency serves as a risk measure. (author)

  5. Outage capacity of multicarrier systems

    KAUST Repository

    Yilmaz, Ferkan; Alouini, Mohamed-Slim

    2010-01-01

    The probability density function and the cumulative distribution function of the product of shifted Gamma variates are obtained in terms of the generalized Fox's H function. Using these new results, the exact outage capacity of multi carrier transmission through a slow Nakagami-m fading channel is presented. Moreover, it is shown that analytical and simulation results are in perfect agreement. © 2009 IEEE.

  6. Allowable outage analysis for the LOFT CIS and reflood assist bypass valves

    International Nuclear Information System (INIS)

    Trainer, J.E.; Matthews, S.D.

    1977-06-01

    To determine the outage time allowable for a typical 1 of 2 redundant valve configuration, a Markov model was created to analyze the various operating states for the valves. Since no performance criteria have been specified, an availability model was constructed with regard to the valve outage

  7. Upgrading BWR training simulators for annual outage operation training

    International Nuclear Information System (INIS)

    Yamakabe, K.; Nakajima, A.; Shiyama, H.; Noji, K.; Okabe, N.; Murata, F.

    2006-01-01

    Based upon the recently developed quality assurance program by the Japanese electric companies, BWR Operator Training Center (BTC) identified the needs to enhance operators' knowledge and skills for operations tasks during annual outage, and started to develop a dedicated operator training course specialized for them. In this paper, we present the total framework of the training course for annual outage operations and the associated typical three functions of our full-scope simulators specially developed and upgraded to conduct the training; namely, (1) Simulation model upgrade for the flow and temperature behavior concerning residual heat removal (RHR) system with shutdown cooling mode, (2) Addition of malfunctions for DC power supply equipment, (3) Simulation model upgrade for water filling operation for reactor pressurization (future development). We have implemented a trial of the training course by using the upgraded 800MW full-scope training simulator with functions (1) and (2) above. As the result of this trial, we are confident that the developed training course is effective for enhancing operators' knowledge and skills for operations tasks during annual outage. (author)

  8. Health and maintenance outages in nuclear power plants: an epidemiological survey

    International Nuclear Information System (INIS)

    Telle, M.A.; Huez, D.; Niedbala, J.M.; Auclair, J.; Canales, J.P.; Duverge, C.; Forest, H.; Gerondal, M.; Paris, P.M.; Renault, J.C.; Bossevain, L.; Blaise, P.; Blanc, M.C.; Goldberg, M.; Charpak, Y.

    1995-01-01

    An epidemiological survey, started in 1989, was carried out at the nuclear power plants in the Loire river valley and at Le Blayais (France). Working conditions, work organisation and their impact on health during annual maintenance outages were studied. The main areas covered in this cross-sectional study were: anxiety and symptoms of depression using the Spielberger and CES-D scales. Comparisons were made during both a scheduled outage and in normal operation on four distinct groups of workers, each individual being his own control. A chi-square test was used for the quantitative variables and a test on differences for the quantitative variables. During a unit outage, more frequent overtime and atypical working hours were reported (p<0.01); working rhythms and safety rules were felt as more restrictive and exposure to radiation higher (p<0.01). Detrimental modifications of anxiety and symptoms of depression were observed on controllers whereas expected on maintenance agents. Similar results were observed when considering the rates of outages. Possible readings are given with reference to qualitative studies carried out on this topic, which implies extending our research with both the quantitative and qualitative approaches. (authors). 10 refs., 6 tabs

  9. Outage capacity of multicarrier systems

    KAUST Repository

    Yilmaz, Ferkan

    2010-01-01

    The probability density function and the cumulative distribution function of the product of shifted Gamma variates are obtained in terms of the generalized Fox\\'s H function. Using these new results, the exact outage capacity of multi carrier transmission through a slow Nakagami-m fading channel is presented. Moreover, it is shown that analytical and simulation results are in perfect agreement. © 2009 IEEE.

  10. Outage Analysis of Asymmetric RF-FSO Systems

    KAUST Repository

    Ansari, Imran Shafique; Abdallah, Mohamed M.; Alouini, Mohamed-Slim; Qaraqe, Khalid A.

    2017-01-01

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channels cascaded with free-space optical (FSO) links is presented. The RF links are modeled by the Rayleigh fading

  11. Enhanced outage prediction modeling for strong extratropical storms and hurricanes in the Northeastern United States

    Science.gov (United States)

    Cerrai, D.; Anagnostou, E. N.; Wanik, D. W.; Bhuiyan, M. A. E.; Zhang, X.; Yang, J.; Astitha, M.; Frediani, M. E.; Schwartz, C. S.; Pardakhti, M.

    2016-12-01

    The overwhelming majority of human activities need reliable electric power. Severe weather events can cause power outages, resulting in substantial economic losses and a temporary worsening of living conditions. Accurate prediction of these events and the communication of forecasted impacts to the affected utilities is necessary for efficient emergency preparedness and mitigation. The University of Connecticut Outage Prediction Model (OPM) uses regression tree models, high-resolution weather reanalysis and real-time weather forecasts (WRF and NCAR ensemble), airport station data, vegetation and electric grid characteristics and historical outage data to forecast the number and spatial distribution of outages in the power distribution grid located within dense vegetation. Recent OPM improvements consist of improved storm classification and addition of new predictive weather-related variables and are demonstrated using a leave-one-storm-out cross-validation based on 130 severe extratropical storms and two hurricanes (Sandy and Irene) in the Northeast US. We show that it is possible to predict the number of trouble spots causing outages in the electric grid with a median absolute percentage error as low as 27% for some storm types, and at most around 40%, in a scale that varies between four orders of magnitude, from few outages to tens of thousands. This outage information can be communicated to the electric utility to manage allocation of crews and equipment and minimize the recovery time for an upcoming storm hazard.

  12. Use of a Computerized Tool (ORAM) to Help Manage Outage Safety and Risk at NPP Krsko

    International Nuclear Information System (INIS)

    Spiler, J.; Basic, I.; Vrbanic, I.; Fifnja, I.; Kastelan, M.; Dagan, W. J.; Shanley, L. B.; Naum, T. J.

    1998-01-01

    Outage Risk Assessment and Management (ORAM) is a computerized methodology developed by the U.S. Electric Power Research Institute (EPRI) to help Nuclear Power Plant personnel manage the risk and safety associated with refueling and forced plant outages. Today, over 60 plants including NPP Krsko are using ORAM during the preparation and performance of plant outages. In fact, many plants are attributing much of the reductions in the duration of refueling outages to the use of ORAM. The success of the ORAM methodology is the capability to provide plant and management personnel with understandable results from both deterministic evaluations of plant safety and quantitative risk assessments. The Nuklearna Elektrarna Krsko (NEK) use of ORAM involves both of these approaches. The deterministic portion of ORAM is used to model the NPP Krsko Shutdown Technical Specifications and administrative considerations. The probabilistic portion of ORAM uses industry and NEK specific initiating events and other risk elements pertaining to shutdown to derive a quantitative risk assessment for various end states, including core damage and RCS boiling. This paper expands on the value of each approach and demonstrates the benefits of combining these elements in the decision-making process. Another key advantage of ORAM is the ability to apply the methodology to specific outages. Since no outage is identical, this provides tremendous benefits to plant personnel for managing the safety and risk of a particular outage. ORAM does this ba organizing all of the various plant configurations and equipment unavailability windows into numerous plant states. Furthermore, ORAM evaluations can be a utomated b y interfacing with outage scheduling software programs such as Primavera. For each plant state, the deterministic and the probabilistic logic evaluations are applied. This paper will demonstrate the ORAM evaluation for an actual NPP Krsko outage. (author)

  13. Outage analysis of opportunistic decode-and-forward relaying

    KAUST Repository

    Tourki, Kamel

    2010-09-01

    In this paper, we investigate a dual-hop opportunistic decode-and-forward relaying scheme where the source may or not be able to communicate directly with the destination. We first derive statistics based on exact probability density function (PDF) of each hop. Then, the PDFs are used to determine closed-form outage probability expression for a transmission rate R. Furthermore, we evaluate the asymptotic outage performance and the diversity order is deduced. Unlike existing works where the analysis focused on high signal-to-noise ratio (SNR) regime, such results are important to enable the designers to take decisions regarding practical systems that operate at low SNR regime. We show that performance simulation results coincide with our analytical results under practical assumption of unbalanced hops. © 2010 IEEE.

  14. Outage analysis of blind cooperative diversity

    KAUST Repository

    Tourki, Kamel; Alouini, Mohamed-Slim

    2011-01-01

    Mobile users with single antennas can still take advantage of spatial diversity through cooperative space-time-encoded transmission. In this paper, we considered a scheme in which a relay chooses to cooperate only if its source-relay channel is of an acceptable quality, and we evaluate the usefulness of relaying when the source acts blindly and ignores the decision of the relays whether they may cooperate or not. In our study, we consider the regenerative relays in which the decisions to cooperate are based on a targeted end-to-end data rate R. We derived the end-to-end outage probability for a transmission rate R and a code rate ρ and look at a power allocation strategy between the source and the relays in order to minimize the end-to-end outage probability at the destination for high signal-to-noise ratio, by using the golden section search method. Performance results show that the computer simulations-based results coincide with our analytical results. Copyright © 2011 John Wiley & Sons, Ltd.

  15. Outage analysis of blind cooperative diversity

    KAUST Repository

    Tourki, Kamel

    2011-06-06

    Mobile users with single antennas can still take advantage of spatial diversity through cooperative space-time-encoded transmission. In this paper, we considered a scheme in which a relay chooses to cooperate only if its source-relay channel is of an acceptable quality, and we evaluate the usefulness of relaying when the source acts blindly and ignores the decision of the relays whether they may cooperate or not. In our study, we consider the regenerative relays in which the decisions to cooperate are based on a targeted end-to-end data rate R. We derived the end-to-end outage probability for a transmission rate R and a code rate ρ and look at a power allocation strategy between the source and the relays in order to minimize the end-to-end outage probability at the destination for high signal-to-noise ratio, by using the golden section search method. Performance results show that the computer simulations-based results coincide with our analytical results. Copyright © 2011 John Wiley & Sons, Ltd.

  16. Ontario-U.S. power outages : impacts on critical infrastructure

    International Nuclear Information System (INIS)

    2006-01-01

    This paper described the power outage and resulting blackout that occurred on August 14, 2003 and identified how critical infrastructure was directly and interdependently impacted in Canada. The aim of the paper was to assist critical infrastructure protection and emergency management professionals in assessing the potential impacts of large-scale critical infrastructure disruptions. Information for the study was acquired from Canadian and American media reports and cross-sectoral information sharing with provincial and federal governments and the private sector. The blackout impacted most of the sources and means of generating, transmitting and distributing power within the area, which in turn impacted all critical infrastructure sectors. Landline and cellular companies experienced operational difficulties, which meant that emergency responders were impacted. Newspapers and the electronic media struggled to release information to the public. The banking and finance industry experienced an immediate degradation of services. The power outage caused shipping and storage difficulties for commercial retailers and dairy producers. A number of incidents were reported where only partially treated waste water was released into neighbouring waterways. The timing of the blackout coincided with the closures of workplaces and created additional difficulties on transportation networks. Many gas station pumps were inoperable. Police, fire departments and ambulance services experienced a dramatic increase in the volume of calls received, and all branches of the emergency services sector encountered transportation delays and difficulties with communications equipment. Nuclear reactors were also impacted. An estimated 150,000 Government of Canada employees were unable to report to work. Estimates have indicated that the power outage cost Ontario's economy between $1 and $2 billion. The outage negatively impacted 82 per cent of small businesses in Ontario. 170 refs., 3 figs

  17. Protective Controller against Cascade Outages with Selective Harmonic Compensation Function

    Science.gov (United States)

    Abramovich, B. N.; Kuznetsov, P. A.; Sychev, Yu A.

    2018-05-01

    The paper presents data on the power quality and development of protective devices for the power networks with distributed generation (DG).The research has shown that power quality requirements for DG networks differ from conventional ones. That is why main tendencies, protective equipment and filters should be modified. There isa developed algorithm for detection and prevention of cascade outages that can lead to the blackoutin DG networks and there was a proposed structural scheme for a new active power filter for selective harmonics compensation. Analysis of these theories and equipment led to the development of protective device that could monitor power balance and cut off non-important consumers. The last part of the article describes a microcontroller prototype developed for connection to the existing power station control center.

  18. Bingham Pump Outage Pits: Environmental information document

    International Nuclear Information System (INIS)

    Pekkala, R.O.; Jewell, C.E.; Holmes, W.G.; Marine, I.W.

    1987-03-01

    Seven waste sites known as the Bingham Pump Outage Pits located in areas of the Savannah River Plant (SRP) received solid waste containing an estimated 4 Ci of low-level radioactivity in 1957-1958. These sites were subsequently backfilled and have been inactive since that time. Most of the radioactivity at the Bingham Pump Outage Pits has been eliminated by radioactive decay. A total of approximately 1 Ci of activity (primarily 137 Cs and 90 Sr) is estimated to remain at the seven sites. The closure options considered for the Bingham Pump Outage Pits are waste removal and closure, no waste removal and closure, and no action. The predominant pathways for human exposure to chemical and/or radioactive constituents are through surface, subsurface, and atmospheric transport. Modeling calculations were made to determine the risks to human population via these general pathways for the three postulated closure options. An ecological assessment was conducted to predict the environmental impacts on aquatic and terrestrial biota. The relative costs for each of the closure options were estimated. Evaluation indicates that the relative human health risks for all closure options are small. The greatest public risk would occur after the waste site was released to unrestricted public use (assumed to occur in Year 2085) via the groundwater pathway to a well. The cost estimates show that the waste removal and closure option is the most expensive (89.6 million dollars). The cost of the no waste removal and the no action options is $800,000. 35 refs., 26 figs., 47 tabs

  19. Environmental determinants of unscheduled residential outages in the electrical power distribution of Phoenix, Arizona

    International Nuclear Information System (INIS)

    Maliszewski, Paul J.; Larson, Elisabeth K.; Perrings, Charles

    2012-01-01

    The sustainability of power infrastructures depends on their reliability. One test of the reliability of an infrastructure is its ability to function reliably in extreme environmental conditions. Effective planning for reliable electrical systems requires knowledge of unscheduled outage sources, including environmental and social factors. Despite many studies on the vulnerability of infrastructure systems, the effect of interacting environmental and infrastructural conditions on the reliability of urban residential power distribution remains an understudied problem. We model electric interruptions using outage data between the years of 2002 and 2005 across Phoenix, Arizona. Consistent with perceptions of increased exposure, overhead power lines positively correlate with unscheduled outages indicating underground cables are more resistant to failure. In the presence of overhead lines, the interaction between birds and vegetation as well as proximity to nearest desert areas and lakes are positive driving factors explaining much of the variation in unscheduled outages. Closeness to the nearest arterial road and the interaction between housing square footage and temperature are also significantly positive. A spatial error model was found to provide the best fit to the data. Resultant findings are useful for understanding and improving electrical infrastructure reliability. - Highlights: ► Unscheduled outages were related to interacting environmental and infrastructural conditions. ► Underground feeders are more resistant to failure. ► In the presence of overhead lines, birds, vegetation, and proximity to desert areas are positive driving factors. ► Proximity to arterial roads and a proxy for energy demand were significantly positive. ► Outages were most spatially dependent up to around 350 m.

  20. Consequences of long-term power outages and high electricity prices lasting for months

    International Nuclear Information System (INIS)

    2005-01-01

    Several areas in the world have experienced electricity outages for longer periods of time, but the consequences of these are sparsely documented. There is a need for further analysis of the socioeconomic consequences of the outages. In addition to KILE (Quality adjusted revenue framework for un supplied energy) costs one has to take into account that the costs often increase proportionally with the durance of the outage, and that KILE tariffs do not reflect lost consumer's surplus for products that are not produced during an outage. A good example is the public underground transport, where the company's economical loss can be significantly smaller than the loss of utility value for the travellers. If the authorities act with reasonability it is difficult to see that periods with very high prices represent a big problem. The most important problems are related to diffused effects, especially for households with a weak economy. These problems can be solved with improved contractual forms (price guarantees) or by transfers to the households, without weakening the incentives for electricity economising (ml)

  1. Performance Shaping Factors Assessments and Application to PHWR Outages

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Seung Woo

    2007-02-15

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10{sup -4} more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted

  2. Performance Shaping Factors Assessments and Application to PHWR Outages

    International Nuclear Information System (INIS)

    Lee, Seung Woo

    2007-02-01

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10 -4 more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted in changes of core damage

  3. Comparison and validation of statistical methods for predicting power outage durations in the event of hurricanes.

    Science.gov (United States)

    Nateghi, Roshanak; Guikema, Seth D; Quiring, Steven M

    2011-12-01

    This article compares statistical methods for modeling power outage durations during hurricanes and examines the predictive accuracy of these methods. Being able to make accurate predictions of power outage durations is valuable because the information can be used by utility companies to plan their restoration efforts more efficiently. This information can also help inform customers and public agencies of the expected outage times, enabling better collective response planning, and coordination of restoration efforts for other critical infrastructures that depend on electricity. In the long run, outage duration estimates for future storm scenarios may help utilities and public agencies better allocate risk management resources to balance the disruption from hurricanes with the cost of hardening power systems. We compare the out-of-sample predictive accuracy of five distinct statistical models for estimating power outage duration times caused by Hurricane Ivan in 2004. The methods compared include both regression models (accelerated failure time (AFT) and Cox proportional hazard models (Cox PH)) and data mining techniques (regression trees, Bayesian additive regression trees (BART), and multivariate additive regression splines). We then validate our models against two other hurricanes. Our results indicate that BART yields the best prediction accuracy and that it is possible to predict outage durations with reasonable accuracy. © 2011 Society for Risk Analysis.

  4. Programming and organisation of unit outages

    International Nuclear Information System (INIS)

    Hadjidakis, Y.; Cezard, C.; Audierne, J.

    1997-01-01

    The unit outages are scheduled every 12 to 18 months for fuel reloading. The success of these shutdowns, with the whole of objectives (duration, dosimetry, costs), with maintaining the safety level, is an important stake for the competitiveness of the enterprise. In this article are described the planning, the experience return and the organisation of scheduled shutdowns which have contribute to the improvement of availability. (N.C.)

  5. Exact Outage Probability of Dual-Hop CSI-Assisted AF Relaying Over Nakagami-m Fading Channels

    KAUST Repository

    Xia, Minghua; Aissa, Sonia; Wu, Yik-Chung

    2012-01-01

    to evaluate the outage performance of the system under study. The analytical results of outage probability coincide exactly with Monte-Carlo simulation results and outperform the previously reported upper bounds in the low and medium SNR regions.

  6. Synergistic Use of Nighttime Satellite Data, Electric Utility Infrastructure, and Ambient Population to Improve Power Outage Detections in Urban Areas

    Directory of Open Access Journals (Sweden)

    Tony A. Cole

    2017-03-01

    Full Text Available Natural and anthropogenic hazards are frequently responsible for disaster events, leading to damaged physical infrastructure, which can result in loss of electrical power for affected locations. Remotely-sensed, nighttime satellite imagery from the Suomi National Polar-orbiting Partnership (Suomi-NPP Visible Infrared Imaging Radiometer Suite (VIIRS Day/Night Band (DNB can monitor power outages in disaster-affected areas through the identification of missing city lights. When combined with locally-relevant geospatial information, these observations can be used to estimate power outages, defined as geographic locations requiring manual intervention to restore power. In this study, we produced a power outage product based on Suomi-NPP VIIRS DNB observations to estimate power outages following Hurricane Sandy in 2012. This product, combined with known power outage data and ambient population estimates, was then used to predict power outages in a layered, feedforward neural network model. We believe this is the first attempt to synergistically combine such data sources to quantitatively estimate power outages. The VIIRS DNB power outage product was able to identify initial loss of light following Hurricane Sandy, as well as the gradual restoration of electrical power. The neural network model predicted power outages with reasonable spatial accuracy, achieving Pearson coefficients (r between 0.48 and 0.58 across all folds. Our results show promise for producing a continental United States (CONUS- or global-scale power outage monitoring network using satellite imagery and locally-relevant geospatial data.

  7. Knowledge to Action - Understanding Natural Hazards-Induced Power Outage Scenarios for Actionable Disaster Responses

    Science.gov (United States)

    Kar, B.; Robinson, C.; Koch, D. B.; Omitaomu, O.

    2017-12-01

    The Sendai Framework for Disaster Risk Reduction 2015-2030 identified the following four priorities to prevent and reduce disaster risks: i) understanding disaster risk; ii) strengthening governance to manage disaster risk; iii) investing in disaster risk reduction for resilience and; iv) enhancing disaster preparedness for effective response, and to "Build Back Better" in recovery, rehabilitation and reconstruction. While forecasting and decision making tools are in place to predict and understand future impacts of natural hazards, the knowledge to action approach that currently exists fails to provide updated information needed by decision makers to undertake response and recovery efforts following a hazard event. For instance, during a tropical storm event advisories are released every two to three hours, but manual analysis of geospatial data to determine potential impacts of the event tends to be time-consuming and a post-event process. Researchers at Oak Ridge National Laboratory have developed a Spatial Decision Support System that enables real-time analysis of storm impact based on updated advisory. A prototype of the tool that focuses on determining projected power outage areas and projected duration of outages demonstrates the feasibility of integrating science with decision making for emergency management personnel to act in real time to protect communities and reduce risk.

  8. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  9. Ratepayers should not fund IP-2 outage, NY Attorney General says

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The New York Attorney General is trying to block Consolidated Edison's effort to pay for an Indian Point nuclear plant outage through the fuel-adjustment clause on the grounds that the utility had repeated system warnings and should have taken action to prevent the leakage of water into the containment building. The utility rejects the assessment of personnel negligence and, blaming equipment failure, plans to replace its heat exchangers. The New York Public Service Commission approved Con Ed's use of the fuel-adjustment clause to pay for replacement power, but agrees that ratepayers should not pay the costs of negligence if the charges are proved. The Attorney General feels that Con Ed could legally challenge a later request for refunds. Other funding possibilities include nuclear-insurance policies or legal action against the equipment manufacturer

  10. Kozloduy NPP units 5 and 6 modernization program. Measures implementation in outages

    International Nuclear Information System (INIS)

    Naydenov, N.; Mignone, O.

    2004-01-01

    The units 5 and 6 modernization program is a highly demanding program composed by many plant modifications and studies about plant conditions. The program measures implementation during the units outages represents a challenge by the need to compromise shut down duration with the workload related to measures installation. The units shutdown duration should be kept to the planned duration. In parallel, contractors work has to be organized, planned and performed to allow successful measures completion. In accordance with the contract requirements, contractors prepare installation documents which comprise all activities to be performed during the installation and testing of the measures. The subcontractors complement these installation documents with the project organization and execution documents, which include the manpower skills, qualifications, work orders, and other important installation instructions and information. Contractors prepared detailed installation schedules, and these were integrated by Parsons E and C in the Integrated installation schedule. The integrated schedule proved to be useful to identify possible area usage conflicts and manpower overlapping, with appropriate results for electrical, instrumentation and control work, and for the utilization of the polar crane in the containment building. Contractors installation schedules were updated on a weekly basis, showing variances versus the target, and manpower histograms for the resource loading. Organization of contractors work was supported by KNPP plant outage meetings, in which status and problems were addressed, and solution and/or corrective actions defined for further implementation. KNPP meetings were planned on a daily basis for most relevant or critical measures, or on a weekly basis for less intensive measures. KNPP meetings proved to be an excellent communication tool for keeping the measures under control and monitoring KNPP defined personnel responsible for authorizing changes, in

  11. The course of a true outage never ran so smooth

    International Nuclear Information System (INIS)

    Harberts, Craig

    1994-01-01

    In order to improve the performance of outages at San Onofre Nuclear Generating Station in California, the working structure of the entire organisation has had to be radically altered, in order to bring San Onofre up to standard with other nuclear plants known to be performing well. Working systems were simplified and efficiency improved. Personnel needed to be remotivated to work cooperatively and the outage budget process was revised to include input from all relevant organizations, historical costs and benchmark information from other plants that performed well. Finally, the decision making and teamwork culture has altered radically at San Onofre over the last decade. (UK)

  12. Outage Analysis of Asymmetric RF-FSO Systems

    KAUST Repository

    Ansari, Imran Shafique

    2017-03-20

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channels cascaded with free-space optical (FSO) links is presented. The RF links are modeled by the Rayleigh fading distribution and the FSO links are modeled by Malaga (M) turbulence distribution. The FSO links account for pointing errors and both types of detection techniques (i.e. heterodyne detection as well as intensity modulation/direct detection (IM/DD)). Transmit diversity is applied at the source, selection combining is applied at the destination, and the relay is equipped with single RF receive antenna and single aperture for relaying the information over FSO links. With this model, a new exact closed-form expression is derived for the outage probability of the end-to- end signal-to-noise ratio of such communication systems in terms of the Meijer\\'s G function under fixed amplify-and-forward relay scheme. All new analytical results are verified via computer-based Monte-Carlo simulations and are illustrated by some selected numerical results.

  13. Verification and Enhancement of VIIRS Day-Night Band (DNB) Power Outage Detection Product

    Science.gov (United States)

    Burke, Angela; Schultz, Lori A.; Omitaomu, Olufemi; Molthan, Andrew L.; Cole, Tony; Griffin, Robert

    2017-01-01

    This case study of Hurricane Matthew (October 2016) uses the NASA Short-Term Prediction Research and Transition (SPoRT) Center DNB power outage product (using GSFC VIIRS DNB preliminary Black Marble product, Roman et al.. 2017) and 2013 LandScan Global population data to look for correlations between the post-event %-of-normal radiance and the utility company-reported outage numbers (obtained from EAGLE-1).

  14. Economic costs of electrical system instability and power outages caused by snakes on the Island of Guam

    Science.gov (United States)

    Fritts, T.H.

    2002-01-01

    The Brown Tree Snake, Boiga irregularis, is an introduced species on Guam where it causes frequent electrical power outages. The snake's high abundance, its propensity for climbing, and use of disturbed habitats all contribute to interruption of Guam's electrical service and the activities that depend on electrical power. Snakes have caused more than 1600 power outages in the 20-yr period of 1978–1997 and most recently nearly 200 outages per year. Single outages spanning the entire island and lasting 8 or more hours are estimated to cost in excess of $3,000,000 in lost productivity, but the costs of outages that involve only parts of the island or those of shorter durations are more difficult to quantify. Costs to the island's economy have exceeded $4.5 M $4.5M"> per year over a 7-yr period without considering repair costs, damage to electrical equipment, and lost revenues. Snakes pose the greatest problem on high voltage transmission lines, on transformers, and inside electrical substations.

  15. Psychosocial work strain of maintenance personnel during annual outage and normal operation in a nuclear power plant

    International Nuclear Information System (INIS)

    Jacobsson, L.; Svensson, O.

    1991-01-01

    This paper reports on a study which evaluates psychosocial work demands during the annual outage for a maintenance work group in a nuclear power plant. The study is based on a stress paradigm and it has been asserted that increased work strain would have a negative effect on performance. Nineteen workers, aged 20-55 years, participated in the study. The subjects filled out a questionnaire comparing work strain during annual outage and normal operation. During the outage period a 3-shift 24-hour work schedule, including nightwork, was used (working hours during normal operation was 7-16). Increased demands on concentration and vigilance, increased time pressure and strain on social relations within the group were found to characterize work during annual outage. Interestingly, for specific work tasks an association was found between the risk of making errors and high psychological workload. Increased work strain, shiftwork including nightwork and reduced social support are important psychosocial risk factors that might contribute to human error during the outage period

  16. Proceedings of a joint OECD/NEA-IAEA symposium on human factors and organisation in NPP maintenance outages: impact on safety

    International Nuclear Information System (INIS)

    1995-01-01

    The sessions of this conference dealt with outage strategy and methods (in Sweden, France and United States), the organisation and management of outages (organisation during refuelling shutdowns in France, safety approaches in France, in the USA, in Canada, in the United Kingdom and in Sweden), case studies and lessons learned (in France, Korea, Sweden, UK, USA), regulatory aspects of outages (UK, Germany, Mexico, France), the development of outage techniques

  17. Methodology if inspections to carry out the nuclear outages model

    International Nuclear Information System (INIS)

    Aycart, J.; Mortenson, S.; Fourquet, J. M.

    2005-01-01

    Before the nuclear generation industry was deregulated in the United States, refueling and maintenance outages in nuclear power plants usually lasted orotund 100 days. After deregulation took effect, improved capability factors and performances became more important. As a result, it became essential to reduce the critical path time during the outage, which meant that activities that had typically been done in series had to be executed in parallel. The new outage model required the development of new tools and new processes, The 360-degree platform developed by GE Energy has made it possible to execute multiple activities in parallel. Various in-vessel visual inspection (IVVI) equipments can now simultaneously perform inspections on the pressurized reactor vessel (RPV) components. The larger number of inspection equipments in turn results in a larger volume of data, with the risk of increasing the time needed for examining them and postponing the end of the analysis phase, which is critical for the outage. To decrease data analysis times, the IVVI Digitalisation process has been development. With this process, the IVVI data are sent via a high-speed transmission line to a site outside the Plant called Center of Excellence (COE), where a team of Level III experts is in charge of analyzing them. The tools for the different product lines are being developed to interfere with each other as little as possible, thus minimizing the impact of the critical path on plant refueling activities. Methods are also being developed to increase the intervals between inspection. In accordance with the guidelines of the Boiling Water Reactor Vessel and Internals project (BWRVIP), the intervals between inspections are typically longer if ultrasound volumetric inspections are performed than if the scope is limited to IVVI. (Author)

  18. Impact of Co-Channel Interference on the Outage Performance Under Multiple Type II Relay Environments

    KAUST Repository

    Choi, Seyeong; Alouini, Mohamed-Slim; Nam, Sung Sik

    2017-01-01

    In this paper, through an exact analysis of the outage probability, we investigate the impact of co-channel interference (CCI) on the outage performance of type II (or user equipment) relay under multiple-relay environments considering the selection combining-based relay selection scheme with the decode-and-forward protocol. We consider the signal to interference plus noise ratio (SINR) over both independent and identically distributed and independent but non-identically distributed fading channels. To fully take into account the effect of CCI, we adopt a more practical parameter such as the CCI coefficient. The major difficulty in the analysis resides in the determination of the statistics of the output SINR. To settle this problem, we first present the general but relatively simplified expressions for the statistics and then the related outage probability in closed-form. Furthermore, to consider more practical scenario, based on the fact that the number of participating relays can be random, we investigate the average outage probability by averaging the number of participating relays.

  19. Impact of Co-Channel Interference on the Outage Performance Under Multiple Type II Relay Environments

    KAUST Repository

    Choi, Seyeong

    2017-11-15

    In this paper, through an exact analysis of the outage probability, we investigate the impact of co-channel interference (CCI) on the outage performance of type II (or user equipment) relay under multiple-relay environments considering the selection combining-based relay selection scheme with the decode-and-forward protocol. We consider the signal to interference plus noise ratio (SINR) over both independent and identically distributed and independent but non-identically distributed fading channels. To fully take into account the effect of CCI, we adopt a more practical parameter such as the CCI coefficient. The major difficulty in the analysis resides in the determination of the statistics of the output SINR. To settle this problem, we first present the general but relatively simplified expressions for the statistics and then the related outage probability in closed-form. Furthermore, to consider more practical scenario, based on the fact that the number of participating relays can be random, we investigate the average outage probability by averaging the number of participating relays.

  20. Partner cooperation with decode-and-forward: Closed-form outage analysis and comparison

    KAUST Repository

    Benjillali, Mustapha

    2013-01-01

    In this paper, we investigate the outage performance of "partner cooperation" based on opportunistic Decodeand- Forward with constrained partial selection and reactive relaying strategies in dual-hop cooperative Nakagami-m fading links. The source/destination, which is based on the unique knowledge of local channel state information, selects the best relay to increase the chances of cooperation in both uplink and downlink communications when the direct link is also available. After deriving new expressions for the cumulative distribution functions of the variables of interest, the outage probability of the system is obtained in closed-form. We also derive the ε-outage capacity in different particular cases, and the obtained results - when the channel model is reduced to a Rayleigh fading - either are new or correspond to those previously obtained in other works. Simulation results confirm the accuracy of our analysis for a large selection of system and fading parameters and provide a new insight into the design and optimization of cooperative configurations. © 2012 IEEE.

  1. Improvement of availability of PWR nuclear plants through the reduction of the time required for refueling/maintenance outages

    International Nuclear Information System (INIS)

    Mayers, J.B.; Soth, L.G.

    1978-04-01

    The objective of the project, conducted by Commonwealth Research Corporation and Westinghouse Electric Corporation, is to identify improvements in procedures and equipment which will reduce the time required for refueling/maintenance outages at PWR nuclear power plants. The outage of Commonwealth Edison Zion Station Unit 1 in March through May of 1976 was evaluated to identify those items which caused delays and those work activities that offer the potential for significant improvements that could reduce the overall duration of the outage and achieve an improvement in the plant's availability for power production. Modifications in procedures have been developed and were evaluated during one or more outages in 1977. Conceptual designs have been developed for equipment modifications to the refueling system that could reduce the time required for the refueling portion of the outage. The purpose of the interim report is to describe those conceptual designs and to assess their impact upon future outages. Recommendations are included for the implementation of these equipment improvements in a continuation of this program as a demonstration of plant availability benefits that can be realized in PWR nuclear plants already in operation or under construction

  2. Outage Analysis and Optimization of SWIPT in Network-Coded Two-Way Relay Networks

    Directory of Open Access Journals (Sweden)

    Ruihong Jiang

    2017-01-01

    Full Text Available This paper investigates the outage performance of simultaneous wireless information and power transfer (SWIPT in network-coded two-way relay systems, where a relay first harvests energy from the signals transmitted by two sources and then uses the harvested energy to forward the received information to the two sources. We consider two transmission protocols, power splitting two-way relay (PS-TWR and time switching two-way relay (TS-TWR protocols. We present two explicit expressions for the system outage probability of the two protocols and further derive approximate expressions for them in high and low SNR cases. To explore the system performance limits, two optimization problems are formulated to minimize the system outage probability. Since the problems are nonconvex and have no known solution methods, a genetic algorithm- (GA- based algorithm is designed. Numerical and simulation results validate our theoretical analysis. It is shown that, by jointly optimizing the time assignment and SWIPT receiver parameters, a great performance gain can be achieved for both PS-TWR and TS-TWR. Moreover, the optimized PS-TWR always outperforms the optimized TS-TWR in terms of outage performance. Additionally, the effects of parameters including relay location and transmit powers are also discussed, which provide some insights for the SWIPT-enabled two-way relay networks.

  3. Outage Performance of Decode-and-Forward in Two-Way Relaying with Outdated CSI

    KAUST Repository

    Hyadi, Amal

    2015-01-07

    In this paper, we analyze the outage behavior of decode-and-forward relaying in the context of selective two-way cooperative systems. First, a new relay selection metric is proposed to take into consideration both transmission rates and instantaneous link conditions between cooperating nodes. Afterwards, the outage probability of the proposed system is derived for Nakagami-m fading channels in the case when perfect channel state information is available and then extended to the more realistic scenario where the available channel state information (CSI) is outdated due to fast fading. New expressions for the outage probability are obtained, and the impact of imperfect CSI on the performance is evaluated. Illustrative numerical results, Monte Carlo simulations, and comparisons with similar approaches are presented to assess the accuracy of our analytical derivations and confirm the performance gain of the proposed scheme.

  4. International outage coding system for nuclear power plants. Results of a co-ordinated research project

    International Nuclear Information System (INIS)

    2004-05-01

    The experience obtained in each individual plant constitutes the most relevant source of information for improving its performance. However, experience of the level of the utility, country and worldwide is also extremely valuable, because there are limitations to what can be learned from in-house experience. But learning from the experience of others is admittedly difficult, if the information is not harmonized. Therefore, such systems should be standardized and applicable to all types of reactors satisfying the needs of the broad set of nuclear power plant operators worldwide and allowing experience to be shared internationally. To cope with the considerable amount of information gathered from nuclear power plants worldwide, it is necessary to codify the information facilitating the identification of causes of outages, systems or component failures. Therefore, the IAEA established a sponsored Co-ordinated Research Project (CRP) on the International Outage Coding System to develop a general, internationally applicable system of coding nuclear power plant outages, providing worldwide nuclear utilities with a standardized tool for reporting outage information. This TECDOC summarizes the results of this CRP and provides information for transformation of the historical outage data into the new coding system, taking into consideration the existing systems for coding nuclear power plant events (WANO, IAEA-IRS and IAEA PRIS) but avoiding duplication of efforts to the maximum possible extent

  5. Management of planned unit outages

    International Nuclear Information System (INIS)

    Brune, W.

    1984-01-01

    Management of planned unit outages at the Bruno Leuschner Nuclear Power Plant is based on the experience gained with Soviet PWR units of the WWER type over a period of more than 50 reactor-years. For PWR units, planned outages concentrate almost exclusively on annual refuellings and major maintenance of the power plant facilities involved. Planning of such major maintenance work is based on a standardized basic network plan and a catalogue of standardized maintenance and inspection measures. From these, an overall maintenance schedule of the unit and partial process plans of the individual main components are derived (manually or by computer) and, in the temporal integration of major maintenance at every unit, fixed starting times and durations are determined. More than 75% of the maintenance work at the Bruno Leuschner Nuclear Power Plant is carried out by the plant's own maintenance personnel. Large-scale maintenance of every unit is controlled by a special project head. He is assisted by commissioners, each of whom is responsible for his own respective item. A daily control report is made. The organizational centre is a central office which works in shifts around the clock. All maintenance orders and reports of completion pass through this office; thus, the overall maintenance schedule can be corrected daily. To enforce the proposed operational strategy, suitable accompanying technical measures are required with respect to effective facility monitoring and technical diagnosis, purposeful improvement of particularly sensitive components and an increase in the effectiveness of maintenance work by special technologies and devices. (author)

  6. Control Room Tasks During Refueling in Ringhals 1 Nuclear Power Plant - Operator performance during refuelling outages

    International Nuclear Information System (INIS)

    Stroebeck, Einar; Olausson, Jesper; Van Gemst, Paul

    1998-01-01

    This paper discusses the performance and tasks of the operators in the control room during refuelling outages. Analyses of such events have, during the last years, shown that the risk for nuclear accidents is not negligible compared with the risk at higher reactor power levels. Some experts have the opinion that, due to mistakes during an outage, the risk for such accidents during the outage and other accidents later on during power operation is higher than in other plant situations. The high risk level is mainly a result of errors at maintenance actions and supervision of lining up of safety systems. Most of the control rooms in existing NPPs were designed more than 10 years ago. At that time the activities and the tasks for the operators were not very well understood. Procedures for refuelling and other activities during the outages were not described very well. Often the utility organisation for refuelling outages was not established at the start of the control room design. Experience from operation during many years has shown that the performance of operators can be improved in existing plant, and thus risks be reduced, by upgrading the control room. These issues have been studied as a part of the modernisation project for Ringhals 1, an ABB Atom BWR owned by Vattenfall AB in Sweden. The paper will describe the working model for upgrading the control room and important issues to take care of with respect to refuelling outages. The identified issues will be used as the input for improving control room philosophy and the individual technical systems. (authors)

  7. Integrated head area design of KNGR to reduce refueling outage duration

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo Tae; Park, Chi Yong; Kim, In Hwan; Kim, Dae Woong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1998-12-31

    In the design of KNGR (Korea Next Generation Reactor), we believe that economy is one of the most important factors to be considered. Thus, we reviewed and evaluated the consequences of designing the head area into an integrated package from an economical point of view. The refueling outage durations of the nuclear power plants currently in operation in Korea, some having and others not having integrated head package, are compared. This paper discusses the characteristics of head area design and the critical design issues of KNGR head area to evaluate the effect of the head area characteristics on the outage duration. 8 refs., 4 figs. (Author)

  8. Integrated head area design of KNGR to reduce refueling outage duration

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo Tae; Park, Chi Yong; Kim, In Hwan; Kim, Dae Woong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    In the design of KNGR (Korea Next Generation Reactor), we believe that economy is one of the most important factors to be considered. Thus, we reviewed and evaluated the consequences of designing the head area into an integrated package from an economical point of view. The refueling outage durations of the nuclear power plants currently in operation in Korea, some having and others not having integrated head package, are compared. This paper discusses the characteristics of head area design and the critical design issues of KNGR head area to evaluate the effect of the head area characteristics on the outage duration. 8 refs., 4 figs. (Author)

  9. Operational readiness verification, phase 1: A study on safety during outage and restart of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, E. [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science; Gauthereau, V. [Linkoeping Univ. (Sweden). Dept. of Industrial Engineering

    2001-06-01

    This report contains the findings from the first phase of a study on safety during outage and restart of nuclear power plants. Operational Readiness Verification (ORV) - in Swedish called Driftklarhetsverifiering (DKV) - refers to the test and verification activities that are necessary to ensure that plant systems are able to provide their required functions when needed - more concretely that all plant systems are in their correct functional state when the plant is restarted after an outage period. The concrete background for this work is that nine ORV related incidents were reported in Sweden between July 1995 and October 1998. The work reported here comprised a literature survey of research relevant for ORV issues, and an assessment of the present situation at Swedish NPPs with respect to ORV. The literature survey was primarily aimed at research related to NPPs, but also looked at domains where similar problems have occurred, such as maintenance in commercial aviation. The survey looked specifically for organisational and MTO aspects relevant to the present situation in Swedish NPPs. One finding was that ORV should be seen as an integral part of maintenance, rather than as a separate activity. Another, that there is a characteristic distribution of error modes for maintenance and ORV, with many sequence errors and omissions, rather than a set of unique error modes. An international study further showed that there are important differences in how procedures are used, and in the balance between decentralisation and centralisation. Several studies also suggested that ORV could usefully be described as a barrier system in relation to the flow of work, for instance using the following five stages: (1) preventive actions during maintenance/outage, (2) post-test after completion of work, (3) pre-test before start-up, (4) the start-up sequence itself, and (5) preventive actions during power operation - possibly including automatic safety systems. In the field survey

  10. Operational readiness verification, phase 1: A study on safety during outage and restart of nuclear power plants

    International Nuclear Information System (INIS)

    Hollnagel, E.; Gauthereau, V.

    2001-06-01

    This report contains the findings from the first phase of a study on safety during outage and restart of nuclear power plants. Operational Readiness Verification (ORV) - in Swedish called Driftklarhetsverifiering (DKV) - refers to the test and verification activities that are necessary to ensure that plant systems are able to provide their required functions when needed - more concretely that all plant systems are in their correct functional state when the plant is restarted after an outage period. The concrete background for this work is that nine ORV related incidents were reported in Sweden between July 1995 and October 1998. The work reported here comprised a literature survey of research relevant for ORV issues, and an assessment of the present situation at Swedish NPPs with respect to ORV. The literature survey was primarily aimed at research related to NPPs, but also looked at domains where similar problems have occurred, such as maintenance in commercial aviation. The survey looked specifically for organisational and MTO aspects relevant to the present situation in Swedish NPPs. One finding was that ORV should be seen as an integral part of maintenance, rather than as a separate activity. Another, that there is a characteristic distribution of error modes for maintenance and ORV, with many sequence errors and omissions, rather than a set of unique error modes. An international study further showed that there are important differences in how procedures are used, and in the balance between decentralisation and centralisation. Several studies also suggested that ORV could usefully be described as a barrier system in relation to the flow of work, for instance using the following five stages: (1) preventive actions during maintenance/outage, (2) post-test after completion of work, (3) pre-test before start-up, (4) the start-up sequence itself, and (5) preventive actions during power operation - possibly including automatic safety systems. In the field survey

  11. Operational readiness verification, phase 1: A study on safety during outage and restart of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, E [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science; Gauthereau, V [Linkoeping Univ. (Sweden). Dept. of Industrial Engineering

    2001-06-01

    This report contains the findings from the first phase of a study on safety during outage and restart of nuclear power plants. Operational Readiness Verification (ORV) - in Swedish called Driftklarhetsverifiering (DKV) - refers to the test and verification activities that are necessary to ensure that plant systems are able to provide their required functions when needed - more concretely that all plant systems are in their correct functional state when the plant is restarted after an outage period. The concrete background for this work is that nine ORV related incidents were reported in Sweden between July 1995 and October 1998. The work reported here comprised a literature survey of research relevant for ORV issues, and an assessment of the present situation at Swedish NPPs with respect to ORV. The literature survey was primarily aimed at research related to NPPs, but also looked at domains where similar problems have occurred, such as maintenance in commercial aviation. The survey looked specifically for organisational and MTO aspects relevant to the present situation in Swedish NPPs. One finding was that ORV should be seen as an integral part of maintenance, rather than as a separate activity. Another, that there is a characteristic distribution of error modes for maintenance and ORV, with many sequence errors and omissions, rather than a set of unique error modes. An international study further showed that there are important differences in how procedures are used, and in the balance between decentralisation and centralisation. Several studies also suggested that ORV could usefully be described as a barrier system in relation to the flow of work, for instance using the following five stages: (1) preventive actions during maintenance/outage, (2) post-test after completion of work, (3) pre-test before start-up, (4) the start-up sequence itself, and (5) preventive actions during power operation - possibly including automatic safety systems. In the field survey

  12. A novel fusion methodology to bridge GPS outages for land vehicle positioning

    International Nuclear Information System (INIS)

    Chen, Wei; Li, Xu; Song, Xiang; Xu, Qimin; Li, Bin; Song, Xianghui

    2015-01-01

    Many intelligent transportation system applications require accurate, reliable, and continuous vehicle position information whether in open-sky environments or in Global Positioning System (GPS) denied environments. However, there remains a challenging task for land vehicles to achieve such positioning performance using low-cost sensors, especially microelectromechanical system (MEMS) sensors. In this paper, a novel and cost-effective fusion methodology to bridge GPS outages is proposed and applied in the Inertial Navigation System (INS)/GPS/ compass integrated positioning system. In the implementation of the proposed methodology, a key data preprocessing algorithm is first developed to eliminate the noise in inertial sensors in order to provide more accurate information for subsequent modeling. Then, a novel hybrid strategy incorporating the designed autoregressive model (AR model)-based forward estimator (ARFE) with Kalman filter (KF) is presented to predict the INS position errors during GPS outages. To verify the feasibility and effectiveness of the proposed methodology, real road tests with various scenarios were performed. The proposed methodology illustrates significant improvement in positioning accuracy during GPS outages. (paper)

  13. Refueling outage services in Spanish Nuclear Power Plants

    International Nuclear Information System (INIS)

    Landete, J. L.; Soto, M.; Nunuez, A.

    2007-01-01

    DOMINGUIS Group, through its 75 years of business development, has positioned as the Spanish leader Group in Services for the Nuclear Energy and Petrochemical Sectors. In this article, we present the most significant services summary that, through the companies that constitute DOMINGUIS Group, we have developed in Refueling Outage in Spanish Nuclear Power Plants. (Author)

  14. Outage performance of Decode-and-Forward partial selection in Nakagami-m fading channels

    KAUST Repository

    Benjillali, Mustapha

    2010-01-01

    In this paper, we investigate the outage performance of Decode-and-Forward with partial selection relaying in dualhop cooperative Nakagami-m fading links. The source, based on the unique knowledge of local first hop channel state information, selects the best relay to increase the chances of successful decoding and hence the possibility of cooperation when the direct link is also available. After deriving the exact distribution of the sum of two gamma variates with the same shape parameter, the outage probability of the system-with and without the direct link-is obtained in closed-form. We also derive the ε-outage capacity in different particular cases, and the obtained results- when the channel model is reduced to a Rayleigh fading-are either new or correspond to those previously obtained in other works. Simulation results confirm the accuracy of our analysis for a large selection of system and fading parameters. © 2009 IEEE.

  15. Shortened outage duration and increased safety with head assembly upgrade packages

    International Nuclear Information System (INIS)

    Leanne, M.; Lisien, P.E.; Plute, K.; Duran, J.

    2007-01-01

    To significantly reduce outage critical path duration and personnel radiation exposure, and to increase personnel safety, Westinghouse Electric Co., LLC has designed and installed upgrades to the existing head assemblies of operating pressurized water reactors. These upgrades are known as Head Assembly Upgrade Packages (HAUPs) or Simplified Head Assemblies (SHAs). Custom configurations are created from a set of standard elements to optimize the design for each unique containment, head assembly configuration, and licensing basis. Two primary options are available for implementation: a full HAUP or targeted component and system upgrades. Plants may achieve much of the outage savings, dose reduction, and safety improvements even with a more limited hardware scope. A range of improvements can be offered from integral missile shields, to redesigned duct work, radiation shields, and cable layout and connection optimization. The hardware changes are customized to target the scope that adds the most value for a given plant. While combining upgrades with a reactor vessel head (RVH) replacement adds some flexibility, it is not necessary. Some plants have chosen to implement targeted upgrades prior to a replacement RVH outage and then complete the remainder of the full HAUP during the replacement RVH outage. Three-dimensional computer aided design tools are used in the conceptual and detailed design phases to identify and avoid interferences between existing and replacement plant components. State-of-the-art computational fluid dynamics models for control drive mechanism (CDM) cooling systems are used to demonstrate the ability to maintain or improve the original design performance while greatly simplifying the disassembly/re-assembly activities. Likewise, state-of-the-art finite element analysis methods allow optimization of structural components while meeting code limits for design basis accident conditions. (authors)

  16. Power Allocation and Outage Probability Analysis for SDN-based Radio Access Networks

    Science.gov (United States)

    Zhao, Yongxu; Chen, Yueyun; Mai, Zhiyuan

    2018-01-01

    In this paper, performance of Access network Architecture based SDN (Software Defined Network) is analyzed with respect to the power allocation issue. A power allocation scheme PSO-PA (Particle Swarm Optimization-power allocation) algorithm is proposed, the proposed scheme is subjected to constant total power with the objective of minimizing system outage probability. The entire access network resource configuration is controlled by the SDN controller, then it sends the optimized power distribution factor to the base station source node (SN) and the relay node (RN). Simulation results show that the proposed scheme reduces the system outage probability at a low complexity.

  17. Architecture of Automated Database Tuning Using SGA Parameters

    Directory of Open Access Journals (Sweden)

    Hitesh KUMAR SHARMA

    2012-05-01

    Full Text Available Business Data always growth from kilo byte, mega byte, giga byte, tera byte, peta byte, and so far. There is no way to avoid this increasing rate of data till business still running. Because of this issue, database tuning be critical part of a information system. Tuning a database in a cost-effective manner is a growing challenge. The total cost of ownership (TCO of information technology needs to be significantly reduced by minimizing people costs. In fact, mistakes in operations and administration of information systems are the single most reasons for system outage and unacceptable performance [3]. One way of addressing the challenge of total cost of ownership is by making information systems more self-managing. A particularly difficult piece of the ambitious vision of making database systems self-managing is the automation of database performance tuning. In this paper, we will explain the progress made thus far on this important problem. Specifically, we will propose the architecture and Algorithm for this problem.

  18. Thermal Hydraulic Assessment for Loss of SDCS Event During the Outage of CANDU Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jonghyun [Gnest, Inc. Taejon (Korea, Republic of); Lee, Kwangho; Oh, Haechol; Jun, Hwangyong [KEPRI, Taejon (Korea, Republic of)

    2006-07-01

    During the outage(overhaul) of the nuclear power plant, there are several operating states other than the full power state, that is 'Hot-Zero Power', 'Depressurized-Cooldown', and 'Partially Drained'. Until now safety assessment has not been done much for this operating state of CANDU type reactor worldwide. For the accuracy and confidence of PSA for the CANDU outage, the safety analysis is necessary. At the first stage, we analyzed the thermal hydraulic characteristics and safety of the postulated event of loss of shutdown cooling system (SDCS) during the partially drained state which is the longest one in the middle of outage period. As an analysis tool, this study uses the best estimate thermal hydraulic code, RELAP5/CANDU which was modified according to the CANDU specific characteristics and based on RELAP5.Mod3.

  19. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  20. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  1. Outage performance of opportunistic two-way amplify-and-forward relaying with outdated channel state information

    KAUST Repository

    Hwang, Kyusung

    2013-09-01

    In this paper, we study the outage performance of an amplify-and-forward (AF)-based two-way relaying (TWR) system with multiple relays where a single relay selection is performed based on outdated channel state information (CSI). Specifically, we propose a single relay selection scheme in AF-based TWR system under outdated CSI conditions. With this policy, we offer a statistical analysis of the signal-to-noise ratio per hop and analyze the outage probability with asymmetric outage thresholds based on CSI-assisted AF protocol. Additionally, we provide the exact and asymptotic expressions based on the provided statistical/joint statistical analyses of a dual-hop AF transmission. Finally, we verify our analytical results with some selected computer-based simulation results. © 1972-2012 IEEE.

  2. Outage performance of reactive cooperation in Nakagami-m fading channels

    KAUST Repository

    Benjillali, Mustapha; Alouini, Mohamed-Slim

    2010-01-01

    In this paper, we investigate the outage performance of Decode-and-Forward with reactive relaying in dual-hop cooperetive Nakagaml-m fading links. The destination, based on the umque knowledge of local second hop channel state information, selects

  3. Outage performance of cognitive radio systems with Improper Gaussian signaling

    KAUST Repository

    Amin, Osama; Abediseid, Walid; Alouini, Mohamed-Slim

    2015-01-01

    design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the proposed bounds and adaptive algorithms by numerical

  4. A Study on the Frequency of Initiating Event of OPR-1000 during Outage Periods

    Energy Technology Data Exchange (ETDEWEB)

    Hong Jae Beol; Jae, Moo Sung [Hanyang Univ., Seoul (Korea, Republic of)

    2013-10-15

    These sources of data did not reflect the latest event data which have occurred during the PWR outage to the frequencies of initiating event Electric Power Research Institute(EPRI) in USA collected the data of loss of decay heat removal during outage from 1989 to 2009 and published technical report. Domestic operating experiences for LOOP is gathered in Operational Performance Information System for Nuclear Power Plant(OPIS). To reduce conservatism and obtain completeness for LPSD PSA, those data should be collected and used to update the frequencies. The frequencies of LOSDC and LOOP are reevaluated using the data of EPRI and OPIS in this paper. Quantification is conducted to recalculate core damage frequency(CDF), since the rate is changed. The results are discussed below. To make an accurate estimate of the initiating events of LPSD PSA, the event data were collected and the frequencies of initiating events were updated using Bayesian approach. CDF was evaluated through quantification. Δ CDF is -40% and the dominant contributor is pressurizer PSV stuck open event. The most of the event data in EPRI TR were collected from US nuclear power plant industry. Those data are not enough to evaluate outage risk precisely. Therefore, to reduce conservatism and obtain completeness for LPSD PSA, the licensee event report and domestic data should be collected and reflected to the frequencies of the initiating events during outage.

  5. 10 CFR 501.191 - Use of natural gas or petroleum for certain unanticipated equipment outages and emergencies...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Use of natural gas or petroleum for certain unanticipated... Natural Gas or Petroleum for Emergency and Unanticipated Equipment Outage Purposes § 501.191 Use of natural gas or petroleum for certain unanticipated equipment outages and emergencies defined in section...

  6. Outage Probability Analysis in Power-Beacon Assisted Energy Harvesting Cognitive Relay Wireless Networks

    Directory of Open Access Journals (Sweden)

    Ngoc Phuc Le

    2017-01-01

    Full Text Available We study the performance of the secondary relay system in a power-beacon (PB assisted energy harvesting cognitive relay wireless network. In our system model, a secondary source node and a relay node first harvest energy from distributed PBs. Then, the source node transmits its data to the destination node with the help of the relay node. Also, fading coefficients of the links from the PBs to the source node and relay node are assumed independent but not necessarily identically distributed (i.n.i.d Nakagami-m random variables. We derive exact expressions for the power outage probability and the channel outage probability. Based on that, we analyze the total outage probability of the secondary relay system. Asymptotic analysis is also performed, which provides insights into the system behavior. Moreover, we evaluate impacts of the primary network on the performance of the secondary network with respect to the tolerant interference threshold at the primary receiver as well as the interference introduced by the primary transmitter at the secondary source and relay nodes. Simulation results are provided to validate the analysis.

  7. A heuristic model for risk and cost impacts of plant outage maintenance schedule

    International Nuclear Information System (INIS)

    Mohammad Hadi Hadavi, S.

    2009-01-01

    Cost and risk are two major competing criteria in maintenance optimization problems. If a plant is forced to shutdown because of accident or fear of accident happening, beside loss of revenue, it causes damage to the credibility and reputation of the business operation. In this paper a heuristic model for incorporating three compelling optimization criteria (i.e., risk, cost, and loss) into a single evaluation function is proposed. Such a model could be used in any evaluation engine of outage maintenance schedule optimizer. It is attempted to make the model realistic and to address the ongoing challenges facing a schedule planner in a simple and commonly understandable fashion. Two simple competing schedules for the NPP feedwater system are examined against the model. The results show that while the model successfully addresses the current challenges for outage maintenance optimization, it properly demonstrates the dynamics of schedule in regards to risk, cost, and losses endured by maintenance schedule, particularly when prolonged outage and lack of maintenance for equipments in need of urgent care are of concern.

  8. Evaluation of allowed outage time using PRA results

    International Nuclear Information System (INIS)

    Johanson, G.

    1985-01-01

    In a probabilistic risk assessment (PRA) different measures of risk importance can be established. These measures can be used as a basis for further evaluation and determination of allowed outage time for specific components, within safety systems of a nuclear power plant. In order to optimize the allowed outage time (AOT) stipulated in the plant's Technical Specification it is necessary to create a methodology which could incorporate existing PRA data into a quantitative extrapolation. In order to evaluate the plant risk status due to AOT in a quantitative manner, the risk achievement worth is utilized. Risk achievement worth is defined as follows: to measure the worth of a feature, in achieving the present risk, one approach is to remove the feature and then determine how much the risk has increased. Thus, the risk achievement worth is formally defined to be the increase in risk if the feature were assumed not be there or to be failed. Another parameter of interest for this analysis is the shutdown risk increase. The shutdown risk achievement worth must be incorporated into the accident sequence risk achievement worth to arrive at an optimal set of plant specific AOTs

  9. INSTORE: a PC-based database program for occupational radiation exposure of a nuclear power plant

    International Nuclear Information System (INIS)

    Cho, Yeong Ho; Kang, Chang Sun; Mun, Ju Hyun; Kim, Hak Su

    1998-01-01

    Ensuring occupational radiation exposure (ORE) as low as is reasonably achievable (ALARA) has been one of very important requirements in a nuclear power plant. It is well known that about 70 percent of occupational dose has incurred from maintenance jobs in the outage period. To reduce occupational dose effectively, the high-dose jobs in the outage period should be identified with their dose reduction potentials and methods. In this study, a PC-based ORE database program, INSTORE, is developed to evaluate ORE doses in individual jobs, and the ORE data of Kori units 3 and 4 are assembled to the database. Based on customary job classification, radiation work is classified into 26 main jobs which comprise 61 detailed jobs, and occupational dose are assessed according to each detailed job. As a result, high-dose jobs are identified with dose reduction priority in terms of collective ORE dose. It is recommended that adequate dose reduction methods for these jobs should be prepared to improve their working conditions and procedures. (author)

  10. Lessons learned in planning ALARA/health physics support for major nuclear power plant outages

    International Nuclear Information System (INIS)

    Gilman, T.R.; Lesinski, M.L.

    1987-01-01

    Although as low as reasonably achievable (ALARA)/health physics is viewed as necessary support for nuclear power plant outage work, it can be the last area to which attention is given in preparing for a large-scope outage. Inadequate lead times cause last-minute preparations resulting in delays in planned work. The Dresden Unit 3 Recirculation Piping Replacement Project is examined from a planning viewpoint. The attention that was given the various areas of a comprehensive ALARA/health physics program is examined, and approximate recommended lead times are discussed. The discussion will follow a chronological path from project inception to the beginning stages of outage work. Initially, the scope of work needs to be assessed by individuals familiar with similar projects of equivalent magnitude. Those individuals need to be health physics professionals who understand the particular utility and/or the site's way of doing business. They should also possess a good understanding of preferred industry practices

  11. Study on European Nuclear Safety Practices during Planned Outages at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2001-12-01

    The present project was aimed at providing: a description of the current status of nuclear safety practices during planned outages at nuclear power plants followed in Europe; the criteria for the safety analysis of future reactors at the design stage; proposing a set of recommendations on good practices and criteria leading to the improvement of nuclear safety during those conditions. The work was organised in 3 phases: Collecting data on current practices; Analysis of questionnaire answers and drawing up of safety good practices references and recommendations; Collecting relevant ideas related to the future reactors at design stage (European Pressurised Water Reactor, European Passive Plant project, European Utilities Requirements and Utilities Requirement Document project). The key element of the performed work was the detailed questionnaire, based on bibliographical review, expert experience and outage practices available in the working team. Different safety areas and activities were covered: outage context; nuclear safety; outage strategy, organisation and control; operating feedback; use of Probabilistic Safety Assessment. The questionnaire was answered by 12 European nuclear power plants, representing 9 different European countries and three different types of reactors (Pressurised Water Reactor, Boiling Water Reactor and Water Water Energy Reactor). Conclusions were drawn under the following headers: Organisational survey and generalities Organisational effectiveness Quality of maintenance Quality of operation Engineering support, management of modification Specific aspects Each analysed subject includes the following topics: Questions background with a summary and the aim of the questions. Current status, that describes common practices, as derived from the answers to the questionnaire, and some examples of good specific practices. Identified good practices. (author)

  12. Outage probability of dual-hop partial relay selection with feedback delay in the presence of interference

    KAUST Repository

    Al-Qahtani, Fawaz S.

    2011-09-01

    In this paper, we investigate the outage performance of a dual-hop relaying systems with partial relay selection and feedback delay. The analysis considers the case of Rayleigh fading channels when the relaying station as well as the destination undergo mutually independent interfering signals. Particularly, we derive the cumulative distribution function (c.d.f.) of a new type of random variable involving sum of multiple independent exponential random variables, based on which, we present closed-form expressions for the exact outage probability of a fixed amplify-and-forward (AF) and decode-and-forward (DF) relaying protocols. Numerical results are provided to illustrate the joint effect of the delayed feedback and co-channel interference on the outage probability. © 2011 IEEE.

  13. Siemens capabilities to perform detailed fuel inspections during short outages

    International Nuclear Information System (INIS)

    Knecht, K.; Reparaz, A.

    1999-01-01

    Fuel inspection data are used to support development activities such as corrosion resistant cladding and advanced fuel assembly designs that will reach higher burnups. Increased inspection efforts are necessary to optimize fuel management and performance strategies. Additionally, there is an increasing trend to reduce outage time in Germany and abroad. Siemens has recently developed several timesaving systems for rapid inspection of fuel assemblies and core components. Siemens' focus in developing these systems has been to obtain data in reduced reactor outage time while increasing both the volume and the quality of the measured data. Mast sipping for PWRs is used for identifying leaking fuel assemblies and allows early detection of leaks during downloading of the fuel assemblies from the reactor. An In-Core sipping system for BWRs based on a hood technique to allow testing a full core within 16 hours is under development. (authors)

  14. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GIS) mbH, Weinheim (Germany)

    2014-07-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  15. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  16. Outage probability analysis of a secondary user in an underlay dual hop cognitive amplify and forward relay network

    Directory of Open Access Journals (Sweden)

    Kiran Chandra

    2016-09-01

    Full Text Available This paper presents the performance evaluation of a secondary user (SU in an underlay cognitive dual-hop relaying system considering instantaneous as well as average channel information of the interfering links (from the secondary source and relay to the primary receiver and the data link from the secondary source to relay, to calculate transmit power and amplifying gain of secondary system. Comparison of above mentioned cases is done for two different scenarios – with direct path and without direct path. We evaluate the performance considering two different diversity techniques namely as selection combining (SC and maximum ratio combining (MRC. The effect of different fading channels (Rayleigh and Nakagami on the outage performance of the SU for the two diversity techniques is also shown. The outage probability of the SU is reduced when the diversity techniques are used (with direct path as compared to the outage probability of SU without direct path. We find that the outage performance is better for instantaneous channel information as compared to average channel information for the links. We observe that MRC provides better performance than SC. Furthermore, this work shows that the outage performance of the SU has been improved when the Nakagami fading channel (m = 2 is considered instead of Rayleigh fading channel.

  17. Efficient Simulation of the Outage Probability of Multihop Systems

    KAUST Repository

    Ben Issaid, Chaouki; Alouini, Mohamed-Slim; Tempone, Raul

    2017-01-01

    In this paper, we present an efficient importance sampling estimator for the evaluation of the outage probability of multihop systems with amplify-and-forward channel state-information-assisted. The proposed estimator is endowed with the bounded relative error property. Simulation results show a significant reduction in terms of number of simulation runs compared to naive Monte Carlo.

  18. Efficient Simulation of the Outage Probability of Multihop Systems

    KAUST Repository

    Ben Issaid, Chaouki

    2017-10-23

    In this paper, we present an efficient importance sampling estimator for the evaluation of the outage probability of multihop systems with amplify-and-forward channel state-information-assisted. The proposed estimator is endowed with the bounded relative error property. Simulation results show a significant reduction in terms of number of simulation runs compared to naive Monte Carlo.

  19. Outages of electric power supply resulting from cable failures Boston Edison Company system

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  20. Replacement power costs due to nuclear-plant outages: a higher standard of care

    International Nuclear Information System (INIS)

    Gransee, M.F.

    1982-01-01

    This article examines recent state public utility commission cases that deal with the high costs of replacement power that utilities must purchase after a nuclear power plant outage. Although most commissions have approved such expenses, it may be that there is a trend toward splitting the costs of such expenses between ratepayer and stockholder. Commissions are demanding a management prudence test to determine the cause of the outage and whether it meets the reasonable man standard before allowing these costs to be passed along to ratepayers. Unless the standard is applied with flexibility, however, utility companies could invoke the defenses covering traditional common law negligence

  1. Outage performance analysis of underlay cognitive RF and FSO wireless channels

    KAUST Repository

    Ansari, Imran Shafique; Abdallah, Mohamed M.; Alouini, Mohamed-Slim; Qaraqe, Khalid A.

    2014-01-01

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channel cascaded with a free-space optical (FSO) link is presented. For the RF link, an underlay cognitive network

  2. Investigation on cause of outage of Wide Range Monitor (WRM) in High Temperature engineering Test Reactor (HTTR). Transport operation toward investigation for cause of outage

    International Nuclear Information System (INIS)

    Shinohara, Masanori; Sawahata, Hiroaki; Kawamoto, Taiki; Saito, Kenji; Takada, Shoji; Yoshida, Naoaki; Isozaki, Ryosuke; Katsuyama, Kozo; Motegi, Toshihiro

    2012-08-01

    An event, in which one of WRMs were disabled to detect the neutron flux in the reactor core, occurred during the period of reactor shut down of HTTR in March, 2010. The actual life time of WRM was unexpectedly shorter than the past developed life time. Investigation of the cause of the outage of WRM toward the recovery of the life time up to the developed life is one of the issues to develop the technology basis of High Temperature Gas cooled Reactor (HTGR). Then, a post irradiation examination was planned to specify the damaged part causing the event in the WRM was also planned. For the investigation, the X-ray computed tomography scanner in Fuels Monitoring Facility (FMF). This report describes the preliminary investigation on the cause of outage of the WRM. The results of study for transportation method of the irradiated WRM from HTTR to FMF is also reported with the record to complete the transport operation. (author)

  3. A RLS-SVM Aided Fusion Methodology for INS during GPS Outages.

    Science.gov (United States)

    Yao, Yiqing; Xu, Xiaosu

    2017-02-24

    In order to maintain a relatively high accuracy of navigation performance during global positioning system (GPS) outages, a novel robust least squares support vector machine (LS-SVM)-aided fusion methodology is explored to provide the pseudo-GPS position information for the inertial navigation system (INS). The relationship between the yaw, specific force, velocity, and the position increment is modeled. Rather than share the same weight in the traditional LS-SVM, the proposed algorithm allocates various weights for different data, which makes the system immune to the outliers. Field test data was collected to evaluate the proposed algorithm. The comparison results indicate that the proposed algorithm can effectively provide position corrections for standalone INS during the 300 s GPS outage, which outperforms the traditional LS-SVM method. Historical information is also involved to better represent the vehicle dynamics.

  4. A RLS-SVM Aided Fusion Methodology for INS during GPS Outages

    Directory of Open Access Journals (Sweden)

    Yiqing Yao

    2017-02-01

    Full Text Available In order to maintain a relatively high accuracy of navigation performance during global positioning system (GPS outages, a novel robust least squares support vector machine (LS-SVM-aided fusion methodology is explored to provide the pseudo-GPS position information for the inertial navigation system (INS. The relationship between the yaw, specific force, velocity, and the position increment is modeled. Rather than share the same weight in the traditional LS-SVM, the proposed algorithm allocates various weights for different data, which makes the system immune to the outliers. Field test data was collected to evaluate the proposed algorithm. The comparison results indicate that the proposed algorithm can effectively provide position corrections for standalone INS during the 300 s GPS outage, which outperforms the traditional LS-SVM method. Historical information is also involved to better represent the vehicle dynamics.

  5. On the Outage Performance of Full-Duplex Selective Decode-and-Forward Relaying

    KAUST Repository

    Khafagy, Mohammad Galal

    2013-02-25

    We evaluate the outage performance in a three-terminal full-duplex relay channel that adopts a selective decode-and-forward protocol, taking relay self-interference into account. Previous work focused on coverage extension scenarios where direct source-destination transmissions are neglected or considered as interference. In this work, we account for the relay self-interference, and exploit the cooperative diversity offered by the independently fading source/relay message replicas that arrive at the destination. We present an approximate, yet accurate, closed-form expression for the end-to-end outage probability that captures their joint effect. With the derived expression in hand, we propose a relay transmit power optimization scheme that only requires the relay knowledge of channel statistics. Finally, we corroborate our analysis with simulations.

  6. Outage Performance of Hybrid FSO/RF System with Low-Complexity Power Adaptation

    KAUST Repository

    Rakia, Tamer

    2016-02-26

    Hybrid free-space optical (FSO) / radio-frequency (RF) systems have emerged as a promising solution for high data- rate wireless communication systems. We consider truncated channel inversion based power adaptation strategy for coherent and non- coherent hybrid FSO/RF systems, employing an adaptive combining scheme. Specifically, we activate the RF link along with the FSO link when FSO link quality is unacceptable, and adaptively set RF transmission power to ensure constant combined signal-to-noise ratio at receiver terminal. Analytical expressions for the outage probability of the hybrid system with and without power adaptation are derived. Numerical examples show that, the hybrid FSO/RF systems with power adaptation achieve considerable outage performance improvement over conventional hybrid FSO/RF systems without power adaptation. © 2015 IEEE.

  7. Radio resource management scheme and outage analysis for network-assisted multi-hop D2D communications

    Directory of Open Access Journals (Sweden)

    Leila Melki

    2016-11-01

    Full Text Available In a cellular network it's very difficult to make spectrum resource more efficiently. Device-to-Device (D2D technology enables new service opportunities, and provides high throughput and reliable communication while reducing the base station load. For better total performance, short-range D2D links and cellular links share the same radio resource and the management of interference becomes a crucial task. Here we argue that single-hop D2D technology can be used to further improve cellular networks performance if the key D2D radio resource management algorithms are suitably extended to support multi-hop D2D communications. Aiming to establish a new paradigm for the analysis and design of multi-hop D2D communications, We propose a radio resource allocation for multi-hop D2D routes based on interference avoidance approach in LTE-A networks. On top of that, we investigate the outage probability of D2D communication. We first introduce a new definition of outage probability by considering the maximum distance to be allowable for single-hop transmission. Then we study and analyze the outage performance of a multi-hop D2D route. We derive the general closed form expression of outage probability of the multi-hop D2D routes. The results demonstrate that the D2D radio, sharing the same resources as the cellular network, provide higher capacity compared to pure cellular communication where all the data is transmitted through the base station. They also demonstrate that the new method of calculation of D2D multi hop outage probability has better performance than classical method defined in the literature.

  8. Power plant and utility performance: how world-record outages are being achieved in the USA

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Two record-breaking refuelling outages at power reactors in the USA are described. The first, at Browns Ferry 3 BWR, was accomplished in 19 days 39 minutes - a shorter time than for an General Electric BWR anywhere in the world hitherto. The management attribute this success to planning, personnel and performance. As well as refuelling, inspections and maintenance, major modifications were carried out. These included the completion of the installation of digital feedwater reactor level control and digital feedwater heater level control. The second outage, at South Texas Project 2 BWR, at 17 days 14 hours and 10 minutes was the fastest yet recorded for any US nuclear unit. This achievement is ascribed to excellent outage preparation and scheduling, the superior condition of the plant equipment and teamwork and safety consciousness on behalf of the plant personnel. Finally, brief consideration is given to the nuclear performance recovery programme of Commonwealth Edison and Ontario Hydro Nuclear. (UK)

  9. Performance Analysis of Secrecy Outage Probability for AF-Based Partial Relay Selection with Outdated Channel Estimates

    Directory of Open Access Journals (Sweden)

    Kyu-Sung Hwang

    2017-01-01

    Full Text Available We study the secrecy outage probability of the amplify-and-forward (AF relaying protocol, which consists of one source, one destination, multiple relays, and multiple eavesdroppers. In this system, the aim is to transmit the confidential messages from a source to a destination via the selected relay in presence of eavesdroppers. Moreover, partial relay selection scheme is utilized for relay selection based on outdated channel state information where only neighboring channel information (source-relays is available and passive eavesdroppers are considered where a transmitter does not have any knowledge of eavesdroppers’ channels. Specifically, we offer the exact secrecy outage probability of the proposed system in a one-integral form as well as providing the asymptotic secrecy outage probability in a closed-form. Numerical examples are given to verify our provided analytical results for different system conditions.

  10. Resolving piping analysis issues to minimize impact on installation activities during refueling outage at nuclear power plants

    International Nuclear Information System (INIS)

    Bhavnani, D.

    1996-01-01

    While it is required to maintain piping code compliance for all phases of installation activities during outages at a nuclear plant, it is equally essential to reduce challenges to the installation personnel on how plant modification work should be performed. Plant betterment activities that incorporate proposed design changes are continually implemented during the outages. Supporting analysis are performed to back these activities for operable systems. The goal is to reduce engineering and craft man-hours and minimize outage time. This paper outlines how plant modification process can be streamlined to facilitate construction teams to do their tasks that involve safety related piping. In this manner, installation can proceed by minimizing on the spot analytical effort and reduce downtime to support the proposed modifications. Examples are provided that permit performance of installation work in any sequence. Piping and hangers including the branch lines are prequalified and determined operable. The system is up front analyzed for all possible scenarios. The modification instructions in the work packages is flexible enough to permit any possible installation sequence. The benefit to this approach is large enough in the sense that valuable outage time is not extended and on site analytical work is not required

  11. Areva: experiences in outage services

    International Nuclear Information System (INIS)

    Wiemeier, R.; Mueller, N.; Blanco, I. J.

    2010-01-01

    As the world leader in the nuclear industry, Areva is firmly committed to the safe and reliable operation of the Spanish nuclear power plants. Following this commitment, Areva has established the subsidiary Areva NP Services Spain as a local platform to provide nuclear services for the Spanish nuclear power plants. being integrated and supported by the global Areva Group, Areva NP Services Spain is able to offer services solutions to all customers demands while maintaining close and sustainable relationships with them. This integration also allows the Spanish personnel of Areva to employ their skills by working in multinational teams in international projects. This article will present the capacities, and the most important recent national and international project performed by Areva NP Services Spain in the field of outage services. (Author)

  12. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  13. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    International Nuclear Information System (INIS)

    Kosonen, M.; Hakola, M.

    2012-01-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  14. Outage analysis for underlay cognitive networks using incremental regenerative relaying

    KAUST Repository

    Tourki, Kamel

    2013-02-01

    Cooperative relay technology has recently been introduced into cognitive radio (CR) networks to enhance the network capacity, scalability, and reliability of end-to-end communication. In this paper, we investigate an underlay cognitive network where the quality of service (QoS) of the secondary link is maintained by triggering an opportunistic regenerative relaying once it falls under an unacceptable level. Analysis is conducted for two schemes, referred to as the channel-state information (CSI)-based and fault-tolerant schemes, respectively, where different amounts of CSI were considered. We first provide the exact cumulative distribution function (cdf) of the received signal-to-noise ratio (SNR) over each hop with colocated relays. Then, the cdf\\'s are used to determine a very accurate closed-form expression for the outage probability for a transmission rate $R$. In a high-SNR region, a floor of the secondary outage probability occurs, and we derive its corresponding expression. We validate our analysis by showing that the simulation results coincide with our analytical results in Rayleigh fading channels. © 1967-2012 IEEE.

  15. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    International Nuclear Information System (INIS)

    Gotcheva, N.; Macchi, L.; Oedewald, P.; Eitrheim, M.H.R.; Axelsson, C.; Reiman, T.; Pietikaeinen, E.

    2013-04-01

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  16. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    Energy Technology Data Exchange (ETDEWEB)

    Gotcheva, N.; Macchi, L.; Oedewald, P. [Technical Research Centre of Finland (VTT), Espoo (Finland); Eitrheim, M.H.R. [Institute for Energy Technology (IFE) (Norway); Axelsson, C.; Reiman, T.; Pietikaeinen, E. [Ringhals AB (NPP), Vattenfall AB (Sweden)

    2013-04-15

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  17. Outage Analysis of Practical FSO/RF Hybrid System With Adaptive Combining

    KAUST Repository

    Rakia, Tamer

    2015-08-01

    Hybrid free-space optical (FSO)/radio-frequency (RF) systems have emerged as a promising solution for high-data-rate wireless transmission. We present and analyze a transmission scheme for the hybrid FSO/RF communication system based on adaptive combining. Specifically, only FSO link is active as long as the instantaneous signal-to-noise ratio (SNR) at the FSO receiver is above a certain threshold level. When it falls below this threshold level, the RF link is activated along with the FSO link and the signals from the two links are combined at the receiver using a dual-branch maximal ratio combiner. Novel analytical expression for the cumulative distribution function (CDF) of the received SNR for the proposed hybrid system is obtained. This CDF expression is used to study the system outage performance. Numerical examples are presented to compare the outage performance of the proposed hybrid FSO/RF system with that of the FSO-only and RF-only systems. © 1997-2012 IEEE.

  18. Zero-Outage Cellular Downlink with Fixed-Rate D2D Underlay

    DEFF Research Database (Denmark)

    Kiilerich Pratas, Nuno; Popovski, Petar

    2015-01-01

    . D2D connections can be instrumental in localized aggregation of uplink M2M traffic to a more capable cellular device, before being finally delivered to the Base Station (BS). In this paper we show that a fixed M2M rate is an enabler of efficient Machine-Type D2D underlay operation taking place......, but not the interfering channels from the MTDs to U, we prove that there is a positive downlink rate that can always be decoded by U, leading to zero-outage of the downlink signal. This is a rather surprising consequence of the features of the multiple access channel and the fixed rate RM. We also consider the case...... of a simpler, single-user decoder at U with successive interference cancellation. However, with single-user decoder, a positive zero-outage rate exists only when NM = 1 and is zero when NM > 1. This implies that joint decoding is instrumental in enabling fixed-rate underlay operation....

  19. Outage probability of distributed beamforming with co-channel interference

    KAUST Repository

    Yang, Liang

    2012-03-01

    In this letter, we consider a distributed beamforming scheme (DBF) in the presence of equal-power co-channel interferers for both amplify-and-forward and decode-and-forward relaying protocols over Rayleigh fading channels. We first derive outage probability expressions for the DBF systems. We then present a performance analysis for a scheme relying on source selection. Numerical results are finally presented to verify our analysis. © 2011 IEEE.

  20. On the outage capacity of the block fading channel at low-power regime

    KAUST Repository

    Rezki, Zouheir

    2014-06-01

    Outage performance of the M-block fading with additive white Gaussian noise (BF-AWGN) is investigated at low-power regime. We consider delay-constrained constant-rate communications with perfect channel state information (CSI) at both the transmitter and the receiver (CSI-TR), under a short-term power constraint. We show that selection diversity that allocates all the power to the strongest block is asymptotically optimal. Then, we provide a simple characterization of the outage probability in the regime of interest. We quantify the reward due to CSI-TR over the constant-rate constant-power scheme and show that this reward increases with the delay constraint. For instance, for Rayleigh fading, we find that a power gain up to 4.3 dB is achievable. © 2014 IEEE.

  1. Prediction of power system frequency response after generator outages using neural nets

    Energy Technology Data Exchange (ETDEWEB)

    Djukanovic, M B; Popovic, D P [Electrotechnicki Inst. ' Nikola Tesla' , Belgrade (Yugoslavia); Sobajic, D J; Pao, Y -H [Case Western Reserve Univ., Cleveland, OH (United States)

    1993-09-01

    A new methodology is presented for estimating the frequency behaviour of power systems necessary for an indication of under-frequency load shedding in steady-state security assessment. It is well known that large structural disturbances such as generator tripping or load outages can initiate cascading outages, system separation into islands, and even the complete breakup. The approach provides a fairly accurate method of estimating the system average frequency response without making simplifications or neglecting non-linearities and small time constants in the equations of generating units, voltage regulators and turbines. The efficiency of the new procedure is demonstrated using the New England power system model for a series of characteristic perturbations. The validity of the proposed approach is verified by comparison with the simulation of short-term dynamics including effects of control and automatic devices. (author)

  2. Outage probability analysis of wireless sensor networks in the presence of channel fading and spatial correlation

    KAUST Repository

    Al-Murad, Tamim M.

    2011-07-01

    Evaluating the reliability of wireless sensor networks is becoming more important as theses networks are being used in crucial applications. The outage probability defined as the probability that the error in the system exceeds a maximum acceptable threshold has recently been used as a measure of the reliability of such systems. In this work we find the outage probability of wireless sensor network in different scenarios of distributed sensing where sensors\\' readings are affected by spatial correlation and in the presence of channel fading. © 2011 IEEE.

  3. Economic and Environmental Impacts of the Columbia-Snake River Extended Lock Outage

    Science.gov (United States)

    2012-03-01

    This reports main objective is to analyze the change in rates and modal costs for shippers, commodity industries and ports prior to, during and after the fifteen week lock outage and to determine the impacts on the environment in the form of energ...

  4. On the Outage Performance of Full-Duplex Selective Decode-and-Forward Relaying

    KAUST Repository

    Khafagy, Mohammad Galal; Ismail, Amr; Alouini, Mohamed-Slim; Aissa, Sonia

    2013-01-01

    expression for the end-to-end outage probability that captures their joint effect. With the derived expression in hand, we propose a relay transmit power optimization scheme that only requires the relay knowledge of channel statistics. Finally, we corroborate our analysis with simulations.

  5. Outage Analysis of Mixed Underlay Cognitive RF MIMO and FSO Relaying with Interference Reduction

    KAUST Repository

    Al-Qahtani, Fawaz S.; El-Malek, Ahmed H. Abd; Ansari, Imran S.; Radaydeh, Redha Mahmoud Mesleh; Zummo, Salam A.

    2017-01-01

    In this paper, we study the outage performance of multiuser mixed underlay radio frequency (RF)/multidestinations free-space optical (FSO) links. For RF links, we consider a secondary network with multiple users that can communicate with multiple destinations through a relaying node. The relay is equipped with an antenna array at the RF side, and it uses the amplify-and-forward (AF) protocol. The primary users (PUs) are equipped with multiple antennas at transmit and receive nodes. The RF link is subjected to the aggregate PUs interference effect on the secondary network. To reduce the effect of PUs interference on secondary network at the relay node, two interference cancellation (IC) schemes are adopted, which vary in terms of complexity and achieved performance. On the other hand, the multidestination FSO links can be exploited to further enhance the quality of the second hop, and their associated channel models account for pointing errors, intensity modulation/direct detection, and heterodyne detection. For the aforementioned system model, we obtain exact and asymptotic closed-form expressions for the end-to-end outage probability. To further enhance system performance, optimal power allocation between the two hops is obtained based on the derived asymptotic outage probability expressions.

  6. Outage Analysis of Cooperative Transmission with Energy Harvesting Relay: Time Switching versus Power Splitting

    Directory of Open Access Journals (Sweden)

    Guanyao Du

    2015-01-01

    Full Text Available This paper investigates the multiuser transmission network with an energy harvesting (EH cooperative relay, where a source transmits independent information to multiple destinations with the help of an energy constrained relay. The relay can harvest energy from the radio frequency (RF signals transmitted from the source, and it helps the multiuser transmission only by consuming the harvested energy. By adopting the time switching and the power splitting relay receiver architectures, we firstly propose two protocols, the time switching cooperative multiuser transmission (TSCMT protocol and the power splitting cooperative multiuser transmission (PSCMT protocol, to enable the simultaneous information processing and EH at the relay for the system. To evaluate the system performance, we theoretically analyze the system outage probability for the two proposed protocols and then derive explicit expressions for each of them, respectively. Numerical results are provided to demonstrate the accuracy of our analytical results and reveal that compared with traditional noncooperative scheme our proposed protocols are green solutions to offer reliable communication and lower system outage probability without consuming additional energy. In particular, for the same transmit power at the source, the PSCMT protocol is superior to the TSCMT protocol to obtain lower system outage probability.

  7. Outage Analysis of Mixed Underlay Cognitive RF MIMO and FSO Relaying with Interference Reduction

    KAUST Repository

    Al-Qahtani, Fawaz S.

    2017-03-22

    In this paper, we study the outage performance of multiuser mixed underlay radio frequency (RF)/multidestinations free-space optical (FSO) links. For RF links, we consider a secondary network with multiple users that can communicate with multiple destinations through a relaying node. The relay is equipped with an antenna array at the RF side, and it uses the amplify-and-forward (AF) protocol. The primary users (PUs) are equipped with multiple antennas at transmit and receive nodes. The RF link is subjected to the aggregate PUs interference effect on the secondary network. To reduce the effect of PUs interference on secondary network at the relay node, two interference cancellation (IC) schemes are adopted, which vary in terms of complexity and achieved performance. On the other hand, the multidestination FSO links can be exploited to further enhance the quality of the second hop, and their associated channel models account for pointing errors, intensity modulation/direct detection, and heterodyne detection. For the aforementioned system model, we obtain exact and asymptotic closed-form expressions for the end-to-end outage probability. To further enhance system performance, optimal power allocation between the two hops is obtained based on the derived asymptotic outage probability expressions.

  8. Method for estimating power outages and restoration during natural and man-made events

    Science.gov (United States)

    Omitaomu, Olufemi A.; Fernandez, Steven J.

    2016-01-05

    A method of modeling electric supply and demand with a data processor in combination with a recordable medium, and for estimating spatial distribution of electric power outages and affected populations. A geographic area is divided into cells to form a matrix. Within the matrix, supply cells are identified as containing electric substations and demand cells are identified as including electricity customers. Demand cells of the matrix are associated with the supply cells as a function of the capacity of each of the supply cells and the proximity and/or electricity demand of each of the demand cells. The method includes estimating a power outage by applying disaster event prediction information to the matrix, and estimating power restoration using the supply and demand cell information of the matrix and standardized and historical restoration information.

  9. Monitoring Disaster-Related Power Outages Using NASA Black Marble Nighttime Light Product

    Science.gov (United States)

    Wang, Z.; Román, M. O.; Sun, Q.; Molthan, A. L.; Schultz, L. A.; Kalb, V. L.

    2018-04-01

    Timely and accurate monitoring of disruptions to the electricity grid, including the magnitude, spatial extent, timing, and duration of net power losses, is needed to improve situational awareness of disaster response and long-term recovery efforts. Satellite-derived Nighttime Lights (NTL) provide an indication of human activity patterns and have been successfully used to monitor disaster-related power outages. The global 500 m spatial resolution National Aeronautics and Space Administration (NASA) Black Marble NTL daily standard product suite (VNP46) is generated from Visible Infrared Imaging Radiometer Suite (VIIRS) Day/Night Band (DNB) onboard the NASA/National Oceanic and Atmospheric Administration (NOAA) Suomi National Polar-orbiting Partnership (Suomi- NPP) satellite, which began operations on 19 January 2012. With its improvements in product accuracy (including critical atmospheric and BRDF correction routines), the VIIRS daily Black Mable product enables systematic monitoring of outage conditions across all stages of the disaster management cycle.

  10. Recent Performance of and Plasma Outage Studies with the SNS H- Source

    Energy Technology Data Exchange (ETDEWEB)

    Stockli, Martin P [ORNL; Han, Baoxi [ORNL; Murray Jr, S N [ORNL; Pennisi, Terry R [ORNL; Piller, Chip [ORNL; Santana, Manuel [ORNL; Welton, Robert F [ORNL

    2016-01-01

    SNS ramps to higher power levels that can be sustained with high availability. The goal is 1.4 MW despite a compromised RFQ, which requires higher RF power than design levels to approach the nominal beam transmission. Unfortunately at higher power the RFQ often loses its thermal stability, a problem apparently enhanced by beam losses and high influxes of hydrogen. Delivering as much H- beam as possible with the least amount of hydrogen led to plasma outages. The root cause is the dense 1-ms long ~55-kW 2-MHz plasma pulses reflecting ~90% of the continuous ~300W, 13-MHz power, which was mitigated with a 4-ms filter for the reflected power signal and an outage resistant, slightly-detuned 13-MHz match. Lowering the H2 also increased the H- beam current to ~55 mA, and increased the transmission by ~7%.

  11. Radiological protection for the ANGRA 1 steam generator replacement outage

    International Nuclear Information System (INIS)

    Oliveira, Magno Jose de; Amaral, Marcos Antonio do; Minelli, Edson; Ferreira, William Alves

    2009-01-01

    The Angra 1 Nuclear Power Plant (NPP) is a Westinghouse two-loop plant with net output before its 1P16 Outage of 632 MWe, with the Old Steam Generators (OSG) type model D3, which were replaced by two new Steam Generators with feed water-ring system. Localized in Angra dos Reis, Rio de Janeiro - Brazil, Angra 1 started in commercial operation in 1985 and, from the beginning problems related to corrosion have appeared in the Inconel 600 alloy of the tubes. The corrosion problems indicated the necessity for a strong control of the tubes thicknesses and, after a time, the ELETRONUCLEAR decided to replace the OSG. In 2009, ELETRONUCLEAR initiated in January 24, the actions for the Steam Generators Replacement - SGR. During the SGR process, several controls were applied in field, which made possible to have no radiological accidents, no dose limits exceeded, and permitted to achieve a very good result in terms of Collective Dose. This paper describes the radiological controls applied for the Angra 1 Steam Generator Replacement Outage, the radiological protection team sizing and distribution and the obtained results. (author)

  12. APPROACH TO ASSESSING THE PREPAREDNESS OF HOSPITALS TO POWER OUTAGES

    Directory of Open Access Journals (Sweden)

    Lenka BREHOVSKÁ

    2017-06-01

    Full Text Available Within the secondary impacts of electricity blackouts, it is necessary to pay attention to facilities providing medical care for the population, namely the hospitals. Hospitals represent a key position in the provision of health care also in times of crisis. These facilities must provide constant care; it is therefore essential that the preparedness of such facilities is kept at a high level. The basic aim of this article is to analyse the preparedness of hospitals to power outages (power failures, blackouts within a pilot study. On that basis, a SWOT analysis is used to determine strengths and weaknesses of the system of preparedness of hospitals to power outages and solutions for better security of hospitals are defined. The sample investigated consists of four hospitals founded by the Regional Authority (hospitals Nos. 1-4 and one hospital founded by the Ministry of Health of the Czech Republic (hospital No. 5. The results of the study shows that most weaknesses of the preparedness of hospitals are represented by inadequately addressed reserves of fuel for the main backup power supply, poor knowledge of employees who are insufficiently retrained, and old backup power supplies (even 35 years in some cases.

  13. Outage Analysis of Train-to-Train Communication Model over Nakagami-m Channel in High-Speed Railway

    Directory of Open Access Journals (Sweden)

    Pengyu Liu

    2013-01-01

    Full Text Available This paper analyzes the end-to-end outage performance of high-speed-railway train-to-train communication model in high-speed railway over independent identical and nonidentical Nakagami-m channels. The train-to-train communication is inter-train communication without an aid of infrastructure (for base station. Source train uses trains on other rail tracks as relays to transmit signals to destination train on the same track. The mechanism of such communication among trains can be divided into three cases based on occurrence of possible-occurrence relay trains. We first present a new closed form for the sum of squared independent Nakagami-m variates and then derive an expression for the outage probability of the identical and non-identical Nakagami-m channels in three cases. In particular, the problem is improved by the proposed formulation that statistic for sum of squared Nakagami-m variates with identical m tends to be infinite. Numerical analysis indicates that the derived analytic results are reasonable and the outage performance is better over Nakagami-m channel in high-speed railway scenarios.

  14. MONITORING DISASTER-RELATED POWER OUTAGES USING NASA BLACK MARBLE NIGHTTIME LIGHT PRODUCT

    Directory of Open Access Journals (Sweden)

    Z. Wang

    2018-04-01

    Full Text Available Timely and accurate monitoring of disruptions to the electricity grid, including the magnitude, spatial extent, timing, and duration of net power losses, is needed to improve situational awareness of disaster response and long-term recovery efforts. Satellite-derived Nighttime Lights (NTL provide an indication of human activity patterns and have been successfully used to monitor disaster-related power outages. The global 500 m spatial resolution National Aeronautics and Space Administration (NASA Black Marble NTL daily standard product suite (VNP46 is generated from Visible Infrared Imaging Radiometer Suite (VIIRS Day/Night Band (DNB onboard the NASA/National Oceanic and Atmospheric Administration (NOAA Suomi National Polar-orbiting Partnership (Suomi- NPP satellite, which began operations on 19 January 2012. With its improvements in product accuracy (including critical atmospheric and BRDF correction routines, the VIIRS daily Black Mable product enables systematic monitoring of outage conditions across all stages of the disaster management cycle.

  15. A user friendly database for use in ALARA job dose assessment

    Energy Technology Data Exchange (ETDEWEB)

    Zodiates, A.M.; Willcock, A. [Cheshire, England (United Kingdom)

    1995-03-01

    The pressurized water reactor (PWR) design chosen for adoption by Nuclear Electric plc was based on the Westinghouse Standard Nuclear Unit Power Plant (SNUPPS). This design was developed to meet the United Kingdom requirements and these improvements are embodied in the Sizewell B plant which will start commercial operation in 1994. A user-friendly database was developed to assist the station in the dose and ALARP assessments of the work expected to be carried out during station operation and outage. The database stores the information in an easily accessible form and enables updating, editing, retrieval, and searches of the information. The database contains job-related information such as job locations, number of workers required, job times, and the expected plant doserates. It also contains the means to flag job requirements such as requirements for temporary shielding, flushing, scaffolding, etc. Typical uses of the database are envisaged to be in the prediction of occupational doses, the identification of high collective and individual dose jobs, use in ALARP assessments, setting of dose targets, monitoring of dose control performance, and others.

  16. Outage and BER analysis for ultrawideband-based WPAN in Nakagami-m fading channels

    KAUST Repository

    Mehbodniya, Abolfazl; Aissa, Sonia

    2011-01-01

    layer. Approximate expressions for the outage probability and average bit error rate (BER) are derived in closed form for the MB-OFDM target receiver, taking into account multi-user interference (MUI), as well as external interference in the form of time

  17. On the outage capacity of the block fading channel at low-power regime

    KAUST Repository

    Rezki, Zouheir; Alouini, Mohamed-Slim

    2014-01-01

    the transmitter and the receiver (CSI-TR), under a short-term power constraint. We show that selection diversity that allocates all the power to the strongest block is asymptotically optimal. Then, we provide a simple characterization of the outage probability

  18. Exact Outage Probability of Dual-Hop CSI-Assisted AF Relaying Over Nakagami-m Fading Channels

    KAUST Repository

    Xia, Minghua

    2012-10-01

    In this correspondence, considering dual-hop channel state information (CSI)-assisted amplify-and-forward (AF) relaying over Nakagami- m fading channels, the cumulative distribution function (CDF) of the end-to-end signal-to-noise ratio (SNR) is derived. In particular, when the fading shape factors m1 and m2 at consecutive hops take non-integer values, the bivariate H-function and G -function are exploited to obtain an exact analytical expression for the CDF. The obtained CDF is then applied to evaluate the outage performance of the system under study. The analytical results of outage probability coincide exactly with Monte-Carlo simulation results and outperform the previously reported upper bounds in the low and medium SNR regions.

  19. On Secrecy Outage of Relay Selection in Underlay Cognitive Radio Networks over Nakagami-m Fading Channels

    KAUST Repository

    Lei, Hongjiang; Zhang, Huan; Ansari, Imran Shafique; Ren, Zhi; Pan, Gaofeng; Qaraqe, Khalid A.; Alouini, Mohamed-Slim

    2017-01-01

    In this paper, the secrecy outage performance of an underlay cognitive decode-and-forward relay network over independent but not necessarily identical distributed (i.n.i.d) Nakagami-m fading channels is investigated, in which the secondary user transmitter communicates with the secondary destination via relays, and an eavesdropper attempts to overhear the information. Based on whether the channel state information (CSI) of the wiretap links is available or not, we analyze the secrecy outage performance with optimal relay selection (ORS) and suboptimal relay selection (SRS) schemes, and multiple relays combining scheme (MRC) scheme is considered for comparison purpose. The exact and asymptotic closed-form expressions for the secrecy outage probability with three different relay selection schemes are derived and verified by Monte-Carlo simulations. The numerical results illustrate that ORS scheme always outperforms SRS and MRC schemes, and SRS scheme is better than MRC scheme in the lower fading parameters scenario. Furthermore, through asymptotic analysis, we find that these three different schemes achieve the same secrecy diversity order, which is determined by the number of the relays, and the fading parameters of the links among the relays and the destination.

  20. On Secrecy Outage of Relay Selection in Underlay Cognitive Radio Networks over Nakagami-m Fading Channels

    KAUST Repository

    Lei, Hongjiang

    2017-10-02

    In this paper, the secrecy outage performance of an underlay cognitive decode-and-forward relay network over independent but not necessarily identical distributed (i.n.i.d) Nakagami-m fading channels is investigated, in which the secondary user transmitter communicates with the secondary destination via relays, and an eavesdropper attempts to overhear the information. Based on whether the channel state information (CSI) of the wiretap links is available or not, we analyze the secrecy outage performance with optimal relay selection (ORS) and suboptimal relay selection (SRS) schemes, and multiple relays combining scheme (MRC) scheme is considered for comparison purpose. The exact and asymptotic closed-form expressions for the secrecy outage probability with three different relay selection schemes are derived and verified by Monte-Carlo simulations. The numerical results illustrate that ORS scheme always outperforms SRS and MRC schemes, and SRS scheme is better than MRC scheme in the lower fading parameters scenario. Furthermore, through asymptotic analysis, we find that these three different schemes achieve the same secrecy diversity order, which is determined by the number of the relays, and the fading parameters of the links among the relays and the destination.

  1. Outage Probability versus Fairness Trade-off in Opportunistic Relay Selection with Outdated CSI

    Directory of Open Access Journals (Sweden)

    Vicario JoseLopez

    2009-01-01

    Full Text Available We analyze the existing trade-offs in terms of system performance versus fairness of a cooperative system based on opportunistic relay selection (ORS and with outdated channel state information (CSI. In particular, system performance is analytically evaluated in terms of outage probability, and the fairness behavior is assessed based on the power consumption at the different relays. In order to improve the fairness behavior of ORS while keeping the selection diversity gain, we propose a relay selection mechanism where the relay with the highest normalized signal-to-noise ratio (SNR is selected for relaying the source's information. The proposed strategy is compared with existing relay selection strategies by adopting a novel graphical representation inspired by expected profit versus risk plots used in modern portfolio theory. As shown in the paper, this strategy allows operating the system in more favorable points of the outage versus fairness region.

  2. Slovenian National Landslide DataBase – A promising approach to slope mass movement prevention plan

    Directory of Open Access Journals (Sweden)

    Mihael Ribičič

    2007-12-01

    Full Text Available The Slovenian territory is, geologically speaking, very diverse and mainly composed of sediments or sedimentary rocks. Slope mass movements occur almost in all parts of the country. In the Alpine carbonate areas of the northern part of Slovenia rock falls, rock slides and even debris flows can be triggered.In the mountainous regions of central Slovenia composed from different clastic rocks, large soil landslides are quite usual, and in the young soil sediments of eastern part of Slovenia there is a large density of small soil landslides.The damage caused by slope mass movements is high, but still no common strategy and regulations to tackle this unwanted event, especially from the aspect of prevention, have been developed. One of the first steps towards an effective strategy of struggling against landslides and other slope mass movements is a central landslide database, where (ideally all known landslide occurrences would be reported, and described in as much detail as possible. At the end of the project of National Landslide Database construction which ended in May 2005 there were more than 6600 registered landslides, of which almost half occurred at a known location and were accompanied with the main characteristic descriptions.The erected database is a chance for Slovenia to once and for all start a solid slope mass movement prevention plan. The only part which is missing and which is the most important one is adopting a legal act that will legalise the obligation of reporting slope mass movement events to the database.

  3. A Unified Simulation Approach for the Fast Outage Capacity Evaluation over Generalized Fading Channels

    KAUST Repository

    Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2016-01-01

    The outage capacity (OC) is among the most important performance metrics of communication systems over fading channels. The evaluation of the OC, when equal gain combining (EGC) or maximum ratio combining (MRC) diversity techniques are employed

  4. Outage and Capacity Performance Evaluation of Distributed MIMO Systems over a Composite Fading Channel

    Directory of Open Access Journals (Sweden)

    Wenjie Peng

    2014-01-01

    Full Text Available The exact closed-form expressions regarding the outage probability and capacity of distributed MIMO (DMIMO systems over a composite fading channel are derived. This is achieved firstly by using a lognormal approximation to a gamma-lognormal distribution when a mobile station (MS in the cell is in a fixed position, and the so-called maximum ratio transmission/selected combining (MRT-SC and selected transmission/maximum ratio combining (ST-MRC schemes are adopted in uplink and downlink, respectively. Then, based on a newly proposed nonuniform MS cell distribution model, which is more consistent with the MS cell hotspot distribution in an actual communication environment, the average outage probability and capacity formulas are further derived. Finally, the accuracy of the approximation method and the rationality of the corresponding theoretical analysis regarding the system performance are proven and illustrated by computer simulations.

  5. Quantification of risk considering external events on the change of allowed outage time and the preventive maintenance during power operation

    Energy Technology Data Exchange (ETDEWEB)

    Kang, D. J.; Kim, K. Y.; Yang, J. E

    2001-03-01

    In this study, for the major safety systems of Ulchin Units 3/4, we quantify the risk on the change of AOT and the PM during power operation to identify the effects on the results of external events PSA when nuclear power plant changes such as allowed outage time are requested. The systems for which the risks on the change of allowed outage time are quantified are High Pressure Safety Injection System (HPSIS), Containment Spray System (CSS), and Emergency Diesel Generator (EDG). The systems for which the risks on the PM during power operation are Low Pressure Safety Injection System (LPSIS), CSS, EDG, Essential Service Water System (ESWS). Following conclusions can be obtained through this study: 1)The increase of core damage frequency ({delta}CDF) on the change of AOT and the conditional core damage probability (CCDP) on the on-line PM of each system are differently quantified according to the cases of considering only internal events or only external events. . 2)It is expected that the quantification of risk including internal and external events is advantageous for the licensee of NPP if the regulatory acceptance criteria for the technical specification changes are relatively set up. However, it is expected to be disadvantageous for the licensee if the acceptance criteria are absolutely set up. 3)It is expected that the conduction on the quantification of only a fire event is sufficient when the quantification of external events PSA model is required for the plant changes of Korea Standard NPPs. 4)It is expected that the quantification of the increase of core damage frequency and the incremental conditional core damage probability on technical specification changes are not needed if the quantification results of those considering only internal events are below regulatory acceptance criteria and the external events PSA results are not greatly affected by the system availability. However, it is expected that the quantification of risk considering external events

  6. Quantification of risk considering external events on the change of allowed outage time and the preventive maintenance during power operation

    International Nuclear Information System (INIS)

    Kang, D. J.; Kim, K. Y.; Yang, J. E.

    2001-03-01

    In this study, for the major safety systems of Ulchin Units 3/4, we quantify the risk on the change of AOT and the PM during power operation to identify the effects on the results of external events PSA when nuclear power plant changes such as allowed outage time are requested. The systems for which the risks on the change of allowed outage time are quantified are High Pressure Safety Injection System (HPSIS), Containment Spray System (CSS), and Emergency Diesel Generator (EDG). The systems for which the risks on the PM during power operation are Low Pressure Safety Injection System (LPSIS), CSS, EDG, Essential Service Water System (ESWS). Following conclusions can be obtained through this study: 1)The increase of core damage frequency (ΔCDF) on the change of AOT and the conditional core damage probability (CCDP) on the on-line PM of each system are differently quantified according to the cases of considering only internal events or only external events. . 2)It is expected that the quantification of risk including internal and external events is advantageous for the licensee of NPP if the regulatory acceptance criteria for the technical specification changes are relatively set up. However, it is expected to be disadvantageous for the licensee if the acceptance criteria are absolutely set up. 3)It is expected that the conduction on the quantification of only a fire event is sufficient when the quantification of external events PSA model is required for the plant changes of Korea Standard NPPs. 4)It is expected that the quantification of the increase of core damage frequency and the incremental conditional core damage probability on technical specification changes are not needed if the quantification results of those considering only internal events are below regulatory acceptance criteria and the external events PSA results are not greatly affected by the system availability. However, it is expected that the quantification of risk considering external events on

  7. Sampled-data-based vibration control for structural systems with finite-time state constraint and sensor outage.

    Science.gov (United States)

    Weng, Falu; Liu, Mingxin; Mao, Weijie; Ding, Yuanchun; Liu, Feifei

    2018-05-10

    The problem of sampled-data-based vibration control for structural systems with finite-time state constraint and sensor outage is investigated in this paper. The objective of designing controllers is to guarantee the stability and anti-disturbance performance of the closed-loop systems while some sensor outages happen. Firstly, based on matrix transformation, the state-space model of structural systems with sensor outages and uncertainties appearing in the mass, damping and stiffness matrices is established. Secondly, by considering most of those earthquakes or strong winds happen in a very short time, and it is often the peak values make the structures damaged, the finite-time stability analysis method is introduced to constrain the state responses in a given time interval, and the H-infinity stability is adopted in the controller design to make sure that the closed-loop system has a prescribed level of disturbance attenuation performance during the whole control process. Furthermore, all stabilization conditions are expressed in the forms of linear matrix inequalities (LMIs), whose feasibility can be easily checked by using the LMI Toolbox. Finally, numerical examples are given to demonstrate the effectiveness of the proposed theorems. Copyright © 2018 ISA. Published by Elsevier Ltd. All rights reserved.

  8. The costs of power outages: A case study from Cyprus

    International Nuclear Information System (INIS)

    Zachariadis, Theodoros; Poullikkas, Andreas

    2012-01-01

    We study the costs of electricity disruptions in Cyprus, which suffered severe power shortages in summer 2011 after an explosion that destroyed 60% of its power generating capacity. We employ both economic and engineering approaches to assess these costs. Among other calculations, we provide estimates of the value of lost load by economic sector and the hourly value of electricity by season and type of day. The results of two economic methods employed to assess welfare losses differ largely, indicating that the assessment of outage costs is associated with many uncertainties. Our calculations show that the emergency actions taken by national energy authorities in response to that accident, though not necessarily optimal, have generally been appropriate and in line with international best practices: the additional costs incurred due to these measures are lower than the economic losses avoided thanks to these actions. Preferential treatment of specific consumer types in the case of repeated power outages remains an open policy question. - Highlights: ► We evaluate the response of energy authorities to a sudden electricity crisis. ► We combine two top-down economic methods and a bottom-up engineering approach. ► We estimate the value of lost electricity by hour, day type and season. ► The response of energy authorities turned out to be effective. ► Costs of emergency actions were lower than the economic losses avoided.

  9. Consequences of long-term power outages and high electricity prices lasting for months; Konsekvenser av langvarige stroemutfall og hoeye kraftpriser i flere maaneder

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    Several areas in the world have experienced electricity outages for longer periods of time, but the consequences of these are sparsely documented. There is a need for further analysis of the socioeconomic consequences of the outages. In addition to KILE (Quality adjusted revenue framework for un supplied energy) costs one has to take into account that the costs often increase proportionally with the durance of the outage, and that KILE tariffs do not reflect lost consumer's surplus for products that are not produced during an outage. A good example is the public underground transport, where the company's economical loss can be significantly smaller than the loss of utility value for the travellers. If the authorities act with reasonability it is difficult to see that periods with very high prices represent a big problem. The most important problems are related to diffused effects, especially for households with a weak economy. These problems can be solved with improved contractual forms (price guarantees) or by transfers to the households, without weakening the incentives for electricity economising (ml)

  10. Placement of Synchronized Measurements for Power System Observability during Cascaded Outages

    Science.gov (United States)

    Thirugnanasambandam, Venkatesh; Jain, Trapti

    2017-11-01

    Cascaded outages often result in power system islanding followed by a blackout and therefore considered as a severe disturbance. Maintaining the observability of each island may help in taking proper control actions to preserve the stability of individual islands thus, averting system collapse. With this intent, a strategy for placement of synchronized measurements, which can be obtained from phasor measurement units (PMU), has been proposed in this paper to keep the system observable during cascaded outages also. Since, all the cascaded failures may not lead to islanding situations, therefore, failures leading to islanding as well as non-islanding situations have been considered. A topology based algorithm has been developed to identify the islanding/non-islanding condition created by a particular cascaded event. Additional contingencies such as single line loss and single PMU failure have also been considered after the occurrence of cascaded events. The proposed method is further extended to incorporate the measurement redundancy, which is desirable for a reliable state estimation. The proposed scheme is tested on IEEE 14-bus, IEEE 30-bus and a practical Indian 246-bus networks. The numerical results ensure the observability of the power system under system intact as well as during cascaded islanding and non-islanding disturbances.

  11. Outage performance analysis of underlay cognitive RF and FSO wireless channels

    KAUST Repository

    Ansari, Imran Shafique

    2014-09-01

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channel cascaded with a free-space optical (FSO) link is presented. For the RF link, an underlay cognitive network is considered where the secondary users share the spectrum with licensed primary users. Indoor femtocells act as a practical example for such networks. More specifically, it is assumed that the RF link applies power control to maintain the interference at the primary network below a predetermined threshold. While the RF channel is modeled by the Rayleigh fading distribution, the FSO link is modeled by a unified Gamma-Gamma turbulence distribution. The FSO link accounts for pointing errors and both types of detection techniques (i.e. heterodyne detection as well as intensity modulation/direct detection (IM/DD)). With this model, a new exact closed-form expression is derived for the outage probability of the end-To-end signal-To-noise ratio of these systems in terms of the Meijer\\'s G function and the Fox\\'s H functions under fixed amplify-and-forward relay scheme. All new analytical results are verified via computer-based Monte-Carlo simulations and are illustrated by some selected numerical results.

  12. Data-based fault-tolerant control for affine nonlinear systems with actuator faults.

    Science.gov (United States)

    Xie, Chun-Hua; Yang, Guang-Hong

    2016-09-01

    This paper investigates the fault-tolerant control (FTC) problem for unknown nonlinear systems with actuator faults including stuck, outage, bias and loss of effectiveness. The upper bounds of stuck faults, bias faults and loss of effectiveness faults are unknown. A new data-based FTC scheme is proposed. It consists of the online estimations of the bounds and a state-dependent function. The estimations are adjusted online to compensate automatically the actuator faults. The state-dependent function solved by using real system data helps to stabilize the system. Furthermore, all signals in the resulting closed-loop system are uniformly bounded and the states converge asymptotically to zero. Compared with the existing results, the proposed approach is data-based. Finally, two simulation examples are provided to show the effectiveness of the proposed approach. Copyright © 2016 ISA. Published by Elsevier Ltd. All rights reserved.

  13. Improvement of availability of PWR nuclear plants through the reduction of the time required for refueling/maintenance outages, Phase 1. Final report

    International Nuclear Information System (INIS)

    Thompson, C.A.

    1978-08-01

    The objective of this project is to identify improvements in procedures and equipment which will reduce the time required for refueling/maintenance outages at PWR nuclear power plants. The outage of Commonwealth Edison Zion Station Unit 1 in March through May of 1976 was evaluated to identify those items which caused delays and those work activities that offer the potential for significant improvements toward reducing its overall duration. Thus, the plant's availability for power production would be increased. Revisions in procedures and some equipment modifications were implemented and evaluated during the Zion Unit 2 refueling/maintenance outage beginning in January 1977. Analysis of the observed data has identified benefits available through improved refueling equipment and also areas where additional new, innovative refueling, or refueling-related equipment should be beneficial. A number of specific design concepts are recommended as a result of Phase 1. In addition, a new master planning mechanism is described for implementation during subsequent planned outages at Zion Station. This final report describes the recommended conceptual designs and planning mechanism and assesses their impact upon future outages. Their effect on savings in refueling time, labor, and radiation exposure is discussed. The estimated economic payoff for these concepts was found to be of such significance that an additional phase of the program is warranted. During this extended phase, a more detailed engineering study should be undertaken to determine the cost of implementation along with more specific estimates of the benefits for PWR plants already in operation or under construction

  14. Assessment and Application of the ROSE Code for Reactor Outage Thermal-Hydraulic and Safety Analysis

    International Nuclear Information System (INIS)

    Liang, Thomas K.S.; Ko, F.-K.; Dai, L.-C.

    2001-01-01

    The currently available tools, such as RELAP5, RETRAN, and others, cannot easily and correctly perform the task of analyzing the system behavior during plant outages. Therefore, a medium-sized program aiming at reactor outage simulation and evaluation, such as midloop operation (MLO) with loss of residual heat removal (RHR), has been developed. Important thermal-hydraulic processes involved during MLO with loss of RHR can be properly simulated by the newly developed reactor outage simulation and evaluation (ROSE) code. The two-region approach with a modified two-fluid model has been adopted to be the theoretical basis of the ROSE code.To verify the analytical model in the first step, posttest calculations against the integral midloop experiments with loss of RHR have been performed. The excellent simulation capacity of the ROSE code against the Institute of Nuclear Energy Research Integral System Test Facility test data is demonstrated. To further mature the ROSE code in simulating a full-sized pressurized water reactor, assessment against the WGOTHIC code and the Maanshan momentary-loss-of-RHR event has been undertaken. The successfully assessed ROSE code is then applied to evaluate the abnormal operation procedure (AOP) with loss of RHR during MLO (AOP 537.4) for the Maanshan plant. The ROSE code also has been successfully transplanted into the Maanshan training simulator to support operator training. How the simulator was upgraded by the ROSE code for MLO will be presented in the future

  15. An Efficient Simulation Scheme of the Outage Probability with Co-Channel Interference

    KAUST Repository

    Rached, Nadhir B.

    2016-03-28

    © 2015 IEEE. The outage probability (OP) of the signal-to-interference-plus-noise ratio (SINR) is an important metric used to evaluate the performance of wireless communication systems operating over fading channels. One major difficulty toward assessing the OP is that, in most of the realistic scenarios, closed-form expressions cannot be derived. This is for instance the case of Log-normal fading environments, in which evaluating the OP of the SINR amounts to computing the probability that a sum of correlated Log-normal variates exceeds a given threshold. Since such a probability is not known to admit a closed-form expression, it has thus far been evaluated by several approximation techniques, the accuracies of which are unfortunately not guaranteed in the interesting region of small outage probabilities. For these regions, simulation techniques based on variance reduction algorithms can represent a good alternative, being well-recognized to be quick and highly accurate for estimating rare event probabilities. This constitutes the major motivation behind our work. More specifically, we propose an efficient importance sampling approach which is based on a covariance matrix scaling technique and illustrate its computational gain over naive Monte Carlo simulations through some selected simulation results.

  16. What is lost when searching only one literature database for articles relevant to injury prevention and safety promotion?

    Science.gov (United States)

    Lawrence, D W

    2008-12-01

    To assess what is lost if only one literature database is searched for articles relevant to injury prevention and safety promotion (IPSP) topics. Serial textword (keyword, free-text) searches using multiple synonym terms for five key IPSP topics (bicycle-related brain injuries, ethanol-impaired driving, house fires, road rage, and suicidal behaviors among adolescents) were conducted in four of the bibliographic databases that are most used by IPSP professionals: EMBASE, MEDLINE, PsycINFO, and Web of Science. Through a systematic procedure, an inventory of articles on each topic in each database was conducted to identify the total unduplicated count of all articles on each topic, the number of articles unique to each database, and the articles available if only one database is searched. No single database included all of the relevant articles on any topic, and the database with the broadest coverage differed by topic. A search of only one literature database will return 16.7-81.5% (median 43.4%) of the available articles on any of five key IPSP topics. Each database contributed unique articles to the total bibliography for each topic. A literature search performed in only one database will, on average, lead to a loss of more than half of the available literature on a topic.

  17. Nonparametric Tree-Based Predictive Modeling of Storm Outages on an Electric Distribution Network.

    Science.gov (United States)

    He, Jichao; Wanik, David W; Hartman, Brian M; Anagnostou, Emmanouil N; Astitha, Marina; Frediani, Maria E B

    2017-03-01

    This article compares two nonparametric tree-based models, quantile regression forests (QRF) and Bayesian additive regression trees (BART), for predicting storm outages on an electric distribution network in Connecticut, USA. We evaluated point estimates and prediction intervals of outage predictions for both models using high-resolution weather, infrastructure, and land use data for 89 storm events (including hurricanes, blizzards, and thunderstorms). We found that spatially BART predicted more accurate point estimates than QRF. However, QRF produced better prediction intervals for high spatial resolutions (2-km grid cells and towns), while BART predictions aggregated to coarser resolutions (divisions and service territory) more effectively. We also found that the predictive accuracy was dependent on the season (e.g., tree-leaf condition, storm characteristics), and that the predictions were most accurate for winter storms. Given the merits of each individual model, we suggest that BART and QRF be implemented together to show the complete picture of a storm's potential impact on the electric distribution network, which would allow for a utility to make better decisions about allocating prestorm resources. © 2016 Society for Risk Analysis.

  18. Fast Outage Probability Simulation for FSO Links with a Generalized Pointing Error Model

    KAUST Repository

    Ben Issaid, Chaouki

    2017-02-07

    Over the past few years, free-space optical (FSO) communication has gained significant attention. In fact, FSO can provide cost-effective and unlicensed links, with high-bandwidth capacity and low error rate, making it an exciting alternative to traditional wireless radio-frequency communication systems. However, the system performance is affected not only by the presence of atmospheric turbulences, which occur due to random fluctuations in the air refractive index but also by the existence of pointing errors. Metrics, such as the outage probability which quantifies the probability that the instantaneous signal-to-noise ratio is smaller than a given threshold, can be used to analyze the performance of this system. In this work, we consider weak and strong turbulence regimes, and we study the outage probability of an FSO communication system under a generalized pointing error model with both a nonzero boresight component and different horizontal and vertical jitter effects. More specifically, we use an importance sampling approach which is based on the exponential twisting technique to offer fast and accurate results.

  19. Outage performance of opportunistic two-way amplify-and-forward relaying with outdated channel state information

    KAUST Repository

    Hwang, Kyusung; Ju, Minchul; Alouini, Mohamed-Slim

    2013-01-01

    In this paper, we study the outage performance of an amplify-and-forward (AF)-based two-way relaying (TWR) system with multiple relays where a single relay selection is performed based on outdated channel state information (CSI). Specifically, we

  20. Development of an Agent Based Model to Estimate and Reduce Time to Restoration of Storm Induced Power Outages

    Science.gov (United States)

    Walsh, T.; Layton, T.; Mellor, J. E.

    2017-12-01

    Storm damage to the electric grid impacts 23 million electric utility customers and costs US consumers $119 billion annually. Current restoration techniques rely on the past experiences of emergency managers. There are few analytical simulation and prediction tools available for utility managers to optimize storm recovery and decrease consumer cost, lost revenue and restoration time. We developed an agent based model (ABM) for storm recovery in Connecticut. An ABM is a computer modeling technique comprised of agents who are given certain behavioral rules and operate in a given environment. It allows the user to simulate complex systems by varying user-defined parameters to study emergent, unpredicted behavior. The ABM incorporates the road network and electric utility grid for the state, is validated using actual storm event recoveries and utilizes the Dijkstra routing algorithm to determine the best path for repair crews to travel between outages. The ABM has benefits for both researchers and utility managers. It can simulate complex system dynamics, rank variable importance, find tipping points that could significantly reduce restoration time or costs and test a broad range of scenarios. It is a modular, scalable and adaptable technique that can simulate scenarios in silico to inform emergency managers before and during storm events to optimize restoration strategies and better manage expectations of when power will be restored. Results indicate that total restoration time is strongly dependent on the number of crews. However, there is a threshold whereby more crews will not decrease the restoration time, which depends on the total number of outages. The addition of outside crews is more beneficial for storms with a higher number of outages. The time to restoration increases linearly with increasing repair time, while the travel speed has little overall effect on total restoration time. Crews traveling to the nearest outage reduces the total restoration time

  1. ISOE: an international occupational exposure database and communications network for dose optimisation

    International Nuclear Information System (INIS)

    Robinson, I.F.; Lazo, E.

    1995-01-01

    The Information System on Occupational Exposure (ISOE) was launched by the Nuclear Energy Agency (NEA) of the Organisation for Economic Co-operation and Development (OECD) on 1 January 1992 to facilitate the communication of dosimetry and ALARA implementation data among nuclear facilities around the world. Members of ISOE include 51 utilities from 17 countries and regulators from 11 countries, with four regional technical centres administering the system and a Steering Group which manages the work. ISOE includes three databases and a communications network at several levels. The three databases NEA1, NEA2 and NEA3 include varying levels of details, with NEA3 being the most detailed giving task and site specific ALARA practices and experiences. Utility membership of ISOE gives full access to the databases whereas regulators have more limited access. This paper reviews the current status of participation, describes the three databases and the communications network. Some dose data showing trends in particular countries are presented as well as dose data relating to operation cycle length and outage length. The advantages of membership are described, and it is concluded that ISOE holds the potential for both dose and cost savings. (author)

  2. Outage Performance Analysis of Relay Selection Schemes in Wireless Energy Harvesting Cooperative Networks over Non-Identical Rayleigh Fading Channels.

    Science.gov (United States)

    Do, Nhu Tri; Bao, Vo Nguyen Quoc; An, Beongku

    2016-02-26

    In this paper, we study relay selection in decode-and-forward wireless energy harvesting cooperative networks. In contrast to conventional cooperative networks, the relays harvest energy from the source's radio-frequency radiation and then use that energy to forward the source information. Considering power splitting receiver architecture used at relays to harvest energy, we are concerned with the performance of two popular relay selection schemes, namely, partial relay selection (PRS) scheme and optimal relay selection (ORS) scheme. In particular, we analyze the system performance in terms of outage probability (OP) over independent and non-identical (i.n.i.d.) Rayleigh fading channels. We derive the closed-form approximations for the system outage probabilities of both schemes and validate the analysis by the Monte-Carlo simulation. The numerical results provide comprehensive performance comparison between the PRS and ORS schemes and reveal the effect of wireless energy harvesting on the outage performances of both schemes. Additionally, we also show the advantages and drawbacks of the wireless energy harvesting cooperative networks and compare to the conventional cooperative networks.

  3. 77 FR 63757 - Extension of the Commission's Rules Regarding Outage Reporting to Interconnected Voice Over...

    Science.gov (United States)

    2012-10-17

    ... telephone subscriptions in the United States were users of interconnected VoIP providers--an increase of 21... Commission's Rules Regarding Outage Reporting to Interconnected Voice Over Internet Protocol Service Providers and Broadband Internet Service Providers AGENCY: Federal Communications Commission. ACTION: Final...

  4. Outage performance improvement by state of the art reactor stud tensioning

    International Nuclear Information System (INIS)

    Oehler, Horst Werner; Vervliet, Herman

    2006-01-01

    Actual methods of reactor closing, i.e. cover to vessel sealing, is based on the creation of an equal load to the sealing circumference by tensioning all reactor studs with an equal force. This method ensures leak tightness through equal compression of the reactor seal in normal circumstances and is largely applied for all types of reactors throughout many generations and designs of nuclear power stations. The tension generated in each reactor stud is controlled indirectly by measuring the reactor stud elongation while under stress. Most studs are designed to measure this elongation easily by conventional or more advanced systems (from individual clock gauge to integrated digital transmission to a computer screen). It is this elongation value, prescribed by the reactor vessel/cover manufacturer which must be respected and demonstrated during all reactor closing operations, weather they take place for initial hydro testing, refuelling operations or periodical hydraulic tests of the primary circuit. Closing (and re-opening) of reactor vessels has become a routine operation as it is required for fuel reloading of the reactor core. This operation is performed on all PWR and BWR type of reactors with a large variety of tooling. As most of the utilities have implemented maintenance optimisation programs, the refuelling outage is reduced to a sequence of activities that allow quick and efficient refuelling of the core. The performance and efficiency of instrumentation and tooling deployed during these essential activities are of the utmost importance to minimise the critical path of the refuelling outage. Today, in support of outage performance, many utilities have invested in new and refurbished tooling to allow quick and efficient opening and closing of the reactor vessel. The features and properties of the most performing multi stud tensioning machines currently in service in nuclear power stations world wide (Africa, Europe, Asia and USA) are presented in the paper

  5. Exact outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel; Yang, Hongchuan; Alouini, Mohamed-Slim

    2010-01-01

    In this paper, we investigate a dual-hop decode-andforward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. In our study, we derive exact closed-form expression for the outage probability based on the exact statistics of each hop. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2010 IEEE.

  6. Exact outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel

    2010-11-01

    In this paper, we investigate a dual-hop decode-andforward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. In our study, we derive exact closed-form expression for the outage probability based on the exact statistics of each hop. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2010 IEEE.

  7. Outage analysis for underlay relay-assisted cognitive networks

    KAUST Repository

    Tourki, Kamel; Qaraqe, Khalid A.; Alouini, Mohamed-Slim

    2012-01-01

    Cooperative relay technology was recently introduced into cognitive radio networks in order to enhance network capacity, scalability, and reliability of end-to-end communication. In this paper, we investigate an underlay cognitive network where the quality of service of the secondary link is maintained by triggering an opportunistic regenerative relaying once it falls under an unacceptable level. We first provide the exact cumulative density function (CDF) of received signal-to-noise (SNR) over each hop with co-located relays. Then, the CDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. We validate our analysis by showing that simulation results coincide with our analytical results in Rayleigh fading channels. © 2012 IEEE.

  8. Outage analysis for underlay relay-assisted cognitive networks

    KAUST Repository

    Tourki, Kamel

    2012-12-01

    Cooperative relay technology was recently introduced into cognitive radio networks in order to enhance network capacity, scalability, and reliability of end-to-end communication. In this paper, we investigate an underlay cognitive network where the quality of service of the secondary link is maintained by triggering an opportunistic regenerative relaying once it falls under an unacceptable level. We first provide the exact cumulative density function (CDF) of received signal-to-noise (SNR) over each hop with co-located relays. Then, the CDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. We validate our analysis by showing that simulation results coincide with our analytical results in Rayleigh fading channels. © 2012 IEEE.

  9. SiC: An Agent Based Architecture for Preventing and Detecting Attacks to Ubiquitous Databases

    OpenAIRE

    Pinzón, Cristian; de Paz Santana, Yanira; Bajo Pérez, Javier; Abraham, Ajith P.; Corchado Rodríguez, Juan M.

    2009-01-01

    One of the main attacks to ubiquitous databases is the structure query language (SQL) injection attack, which causes severe damages both in the commercial aspect and in the user’s confidence. This chapter proposes the SiC architecture as a solution to the SQL injection attack problem. This is a hierarchical distributed multiagent architecture, which involves an entirely new approach with respect to existing architectures for the prevention and detection of SQL injections. SiC incorporates a k...

  10. A Short-Term Outage Model of Wind Turbines with Doubly Fed Induction Generators Based on Supervisory Control and Data Acquisition Data

    Directory of Open Access Journals (Sweden)

    Peng Sun

    2016-10-01

    Full Text Available This paper presents a short-term wind turbine (WT outage model based on the data collected from a wind farm supervisory control and data acquisition (SCADA system. Neural networks (NNs are used to establish prediction models of the WT condition parameters that are dependent on environmental conditions such as ambient temperature and wind speed. The prediction error distributions are discussed and used to calculate probabilities of the operation of protection relays (POPRs that were caused by the threshold exceedance of the environmentally sensitive parameters. The POPRs for other condition parameters are based on the setting time of the operation of protection relays. The union probability method is used to integrate the probabilities of operation of each protection relay to predict the WT short term outage probability. The proposed method has been used for real 1.5 MW WTs with doubly fed induction generators (DFIGs. The results show that the proposed method is more effective in WT outage probability prediction than traditional methods.

  11. Worldwide OMEGA and Very Low Frequency (VLF) Transmitter Outages, January to December 1980.

    Science.gov (United States)

    1981-05-01

    WORLDWIDE OMEGA AND VERY LOW FREQUENCY IVLF) TRANSMITTER OUTAGE--ETC, MAY 81 L RZONCA ,’,L.ASSI LED FAA-CT-81-26 FAA-RD- B1 -29 UL7 A-I’ l15FDRL AIO...computer for the time period GBR - Rugby , England (16.00 kHz) January to December 1980. (For the purposes of this report, any downtime NA - Cutler, Maine

  12. Fundamental Limits of Parallel Optical Wireless Channels: Capacity Results and Outage Formulation

    KAUST Repository

    Chaaban, Anas; Rezki, Zouheir; Alouini, Mohamed-Slim

    2016-01-01

    Multi-channel (MC) optical wireless communication (OWC) systems employing wave-division multiplexing for outdoors free-space optical communications, or multi-user timedivision multiple access for indoors visible-light communications, e.g., can be modeled as parallel channels. Multi-input multioutput OWC systems can also be transformed, possibly with some performance loss, to parallel channels using pre-/postcoding. Studying the performance of such MC-OWC systems requires characterizing the capacity of the underlying parallel channels. In this paper, upper and lower bounds on the capacity of constant parallel OWC channels with a total average intensity constraint are derived. Then, the paper focuses on finding intensity allocations that maximize the lower bounds given channel-state information at the transmitter (CSIT). Due to its nonconvexity, the KKT conditions are used to describe a list of candidate allocations. Instead searching exhaustively for the best solution, low-complexity near-optimal algorithms are proposed. The resulting optimized lower bound nearly coincides with capacity at high signal-to-noise ratio (SNR). Under a quasi-static channel model and in the absence of CSIT, outage probability upper and lower bounds are derived. Those bounds also meet at high SNR, thus characterizing the outage capacity in this regime. Finally, the results are extended to a system with both average and peak intensity constraints.

  13. Fundamental Limits of Parallel Optical Wireless Channels: Capacity Results and Outage Formulation

    KAUST Repository

    Chaaban, Anas

    2016-10-26

    Multi-channel (MC) optical wireless communication (OWC) systems employing wave-division multiplexing for outdoors free-space optical communications, or multi-user timedivision multiple access for indoors visible-light communications, e.g., can be modeled as parallel channels. Multi-input multioutput OWC systems can also be transformed, possibly with some performance loss, to parallel channels using pre-/postcoding. Studying the performance of such MC-OWC systems requires characterizing the capacity of the underlying parallel channels. In this paper, upper and lower bounds on the capacity of constant parallel OWC channels with a total average intensity constraint are derived. Then, the paper focuses on finding intensity allocations that maximize the lower bounds given channel-state information at the transmitter (CSIT). Due to its nonconvexity, the KKT conditions are used to describe a list of candidate allocations. Instead searching exhaustively for the best solution, low-complexity near-optimal algorithms are proposed. The resulting optimized lower bound nearly coincides with capacity at high signal-to-noise ratio (SNR). Under a quasi-static channel model and in the absence of CSIT, outage probability upper and lower bounds are derived. Those bounds also meet at high SNR, thus characterizing the outage capacity in this regime. Finally, the results are extended to a system with both average and peak intensity constraints.

  14. Outage Performance Analysis of Relay Selection Schemes in Wireless Energy Harvesting Cooperative Networks over Non-Identical Rayleigh Fading Channels †

    Science.gov (United States)

    Do, Nhu Tri; Bao, Vo Nguyen Quoc; An, Beongku

    2016-01-01

    In this paper, we study relay selection in decode-and-forward wireless energy harvesting cooperative networks. In contrast to conventional cooperative networks, the relays harvest energy from the source’s radio-frequency radiation and then use that energy to forward the source information. Considering power splitting receiver architecture used at relays to harvest energy, we are concerned with the performance of two popular relay selection schemes, namely, partial relay selection (PRS) scheme and optimal relay selection (ORS) scheme. In particular, we analyze the system performance in terms of outage probability (OP) over independent and non-identical (i.n.i.d.) Rayleigh fading channels. We derive the closed-form approximations for the system outage probabilities of both schemes and validate the analysis by the Monte-Carlo simulation. The numerical results provide comprehensive performance comparison between the PRS and ORS schemes and reveal the effect of wireless energy harvesting on the outage performances of both schemes. Additionally, we also show the advantages and drawbacks of the wireless energy harvesting cooperative networks and compare to the conventional cooperative networks. PMID:26927119

  15. On the sum of Gamma-Gamma variates with application to the fast outage probability evaluation over fading channels

    KAUST Repository

    Ben Issaid, Chaouki

    2017-04-01

    The Gamma-Gamma distribution has recently emerged in a number of applications ranging from modeling scattering and reverbation in sonar and radar systems to modeling atmospheric turbulence in wireless optical channels. In this respect, assessing the outage probability achieved by some diversity techniques over this kind of channels is of major practical importance. In many circumstances, this is intimately related to the difficult question of analyzing the statistics of a sum of Gamma-Gamma random variables. Answering this question is not a simple matter. This is essentially because outage probabilities encountered in practice are often very small, and hence the use of classical Monte Carlo methods is not a reasonable choice. This lies behind the main motivation of the present work. In particular, this paper proposes a new approach to estimate the left tail of the sum of independent and identically distributed Gamma-Gamma variates. More specifically, we propose a mean-shift importance sampling scheme that efficiently evaluates the outage probability of L-branch maximum ratio combining diversity receivers over Gamma-Gamma fading channels. The proposed estimator satisfies the well-known bounded relative error criterion. We show the accuracy and the efficiency of our approach compared to naive Monte Carlo via some selected numerical simulations.

  16. On the sum of Gamma-Gamma variates with application to the fast outage probability evaluation over fading channels

    KAUST Repository

    Ben Issaid, Chaouki; Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2017-01-01

    The Gamma-Gamma distribution has recently emerged in a number of applications ranging from modeling scattering and reverbation in sonar and radar systems to modeling atmospheric turbulence in wireless optical channels. In this respect, assessing the outage probability achieved by some diversity techniques over this kind of channels is of major practical importance. In many circumstances, this is intimately related to the difficult question of analyzing the statistics of a sum of Gamma-Gamma random variables. Answering this question is not a simple matter. This is essentially because outage probabilities encountered in practice are often very small, and hence the use of classical Monte Carlo methods is not a reasonable choice. This lies behind the main motivation of the present work. In particular, this paper proposes a new approach to estimate the left tail of the sum of independent and identically distributed Gamma-Gamma variates. More specifically, we propose a mean-shift importance sampling scheme that efficiently evaluates the outage probability of L-branch maximum ratio combining diversity receivers over Gamma-Gamma fading channels. The proposed estimator satisfies the well-known bounded relative error criterion. We show the accuracy and the efficiency of our approach compared to naive Monte Carlo via some selected numerical simulations.

  17. Inducement of IGA/SCC in Inconel 600 steam generator tubing during unit outages

    Energy Technology Data Exchange (ETDEWEB)

    Durance, D.; Sedman, K. [Bruce Power, Tiverton, Ontario (Canada); Roberts, J. [CANTECH Associates Ltd., Burlington, Ontario (Canada); King, P. [Babcock and Wilcox Canada, Cambridge, Ontario (Canada); Gorman, J. [Dominion Engineering, Reston, VA (United States); Allen, R. [Kinectrics, Inc., Toronto, Ontario (Canada)

    2008-07-01

    The degradation of Unit 4 SG tubing by IGA/SCC has limited both the operating period and end of life predictions for Unit 4 since restart in late 2003. The circumferential IGA/SCC has been most significant in SG4 with substantial increases in both initiation and growth rates from 2005 through the spring of 2007. A detailed review of the occurrence of circumferential OD IGA/SCC at the RTZ in the HL TTS region of Bruce 4 steam generator tubes has led a conclusion that it is probable that the IGA/SCC has been the result of attack by partially reduced sulfur species such as tetrathionates and thiosulfates during periods of low temperature exposure. It is believed that attack of this type has mostly likely occurred during startup evolutions following outages as the result the development of aggressive reduced sulfur species in the TTS region during periods when the boilers were fully drained for maintenance activities. The modification of outage practices to limit secondary side oxygen ingress in the spring of 2007 has apparently arrested the degradation and has had significant affects on the allowable operating interval and end of life predictions for the entire unit. (author)

  18. Inducement of IGA/SCC in Inconel 600 steam generator tubing during unit outages

    International Nuclear Information System (INIS)

    Durance, D.; Sedman, K.; Roberts, J.; King, P.; Gorman, J.; Allen, R.

    2008-01-01

    The degradation of Unit 4 SG tubing by IGA/SCC has limited both the operating period and end of life predictions for Unit 4 since restart in late 2003. The circumferential IGA/SCC has been most significant in SG4 with substantial increases in both initiation and growth rates from 2005 through the spring of 2007. A detailed review of the occurrence of circumferential OD IGA/SCC at the RTZ in the HL TTS region of Bruce 4 steam generator tubes has led a conclusion that it is probable that the IGA/SCC has been the result of attack by partially reduced sulfur species such as tetrathionates and thiosulfates during periods of low temperature exposure. It is believed that attack of this type has mostly likely occurred during startup evolutions following outages as the result the development of aggressive reduced sulfur species in the TTS region during periods when the boilers were fully drained for maintenance activities. The modification of outage practices to limit secondary side oxygen ingress in the spring of 2007 has apparently arrested the degradation and has had significant affects on the allowable operating interval and end of life predictions for the entire unit. (author)

  19. Use of workstations in the ANAV outage tasks course access

    International Nuclear Information System (INIS)

    Gómez Rodriguez, Carlos A.

    2016-01-01

    The access course for the Asco and Vandellos II Nuclear Power Plants contains all of the training that is considered necessary in compliance with the stipulations of current legislation for the pupils to carry out their activity at the plants. Given the heterogeneity of the special characteristics of those workers who take part in the outage tasks at our plants we have sought to improve the learning values of their access course with the inclusion of Work Stations since 2013. Several changes have been made in the training action since that date to make it more interactive.

  20. 76 FR 36892 - Proposed Extension of Part 4 of the Commission's Rules Regarding Outage Reporting to...

    Science.gov (United States)

    2011-06-23

    ...: None. Title: Communications Outage Reporting for Interconnected Voice over Internet Protocol Service.... Type of Review: New collection. Respondents: Businesses (Interconnected Voice over Internet Protocol... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 4 [PS Docket No. 11-82; FCC 11-74] Proposed...

  1. Efficient Outage Probability Evaluation of Diversity Receivers Over Generalized Gamma Channels

    KAUST Repository

    Ben Issaid, Chaouki

    2016-10-01

    In this paper, we are interested in determining the cumulative distribution function of the sum of generalized Gamma in the setting of rare event simulations. To this end, we present an efficient importance sampling estimator. The main result of this work is the bounded relative property of the proposed estimator. This result is used to accurately estimate the outage probability of multibranch maximum ratio combining and equal gain combining diversity receivers over generalized Gamma fading channels. Selected numerical simulations are discussed to show the robustness of our estimator compared to naive Monte Carlo.

  2. Efficient Outage Probability Evaluation of Diversity Receivers Over Generalized Gamma Channels

    KAUST Repository

    Ben Issaid, Chaouki; Alouini, Mohamed-Slim; Tempone, Raul

    2016-01-01

    In this paper, we are interested in determining the cumulative distribution function of the sum of generalized Gamma in the setting of rare event simulations. To this end, we present an efficient importance sampling estimator. The main result of this work is the bounded relative property of the proposed estimator. This result is used to accurately estimate the outage probability of multibranch maximum ratio combining and equal gain combining diversity receivers over generalized Gamma fading channels. Selected numerical simulations are discussed to show the robustness of our estimator compared to naive Monte Carlo.

  3. SiC: An Agent Based Architecture for Preventing and Detecting Attacks to Ubiquitous Databases

    Science.gov (United States)

    Pinzón, Cristian; de Paz, Yanira; Bajo, Javier; Abraham, Ajith; Corchado, Juan M.

    One of the main attacks to ubiquitous databases is the structure query language (SQL) injection attack, which causes severe damages both in the commercial aspect and in the user’s confidence. This chapter proposes the SiC architecture as a solution to the SQL injection attack problem. This is a hierarchical distributed multiagent architecture, which involves an entirely new approach with respect to existing architectures for the prevention and detection of SQL injections. SiC incorporates a kind of intelligent agent, which integrates a case-based reasoning system. This agent, which is the core of the architecture, allows the application of detection techniques based on anomalies as well as those based on patterns, providing a great degree of autonomy, flexibility, robustness and dynamic scalability. The characteristics of the multiagent system allow an architecture to detect attacks from different types of devices, regardless of the physical location. The architecture has been tested on a medical database, guaranteeing safe access from various devices such as PDAs and notebook computers.

  4. An Internet of Things Approach to Electrical Power Monitoring and Outage Reporting

    Energy Technology Data Exchange (ETDEWEB)

    Koch, Daniel B [ORNL

    2017-01-01

    The so-called Internet of Things concept has captured much attention recently as ordinary devices are connected to the Internet for monitoring and control purposes. One enabling technology is the proliferation of low-cost, single board computers with built-in network interfaces. Some of these are capable of hosting full-fledged operating systems that provide rich programming environments. Taken together, these features enable inexpensive solutions for even traditional tasks such as the one presented here for electrical power monitoring and outage reporting.

  5. Optimal utilization of outages. The tasks of the OEM and/or service provider

    International Nuclear Information System (INIS)

    Jakobs, Norbert; Grauf, Eberhard

    1998-01-01

    The deregulation of Europe's power market on January 1, 1999 will force many electric utilities and especially nuclear power plant operators to introduce extensive cost-cutting measures in order that they can hold their own in the new competitive environment. Existing plants basically have three potential ways of reducing their power generating costs: by increasing availability, reducing fuel costs and cutting back operating costs. Optimizing plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing expenditure on maintenance. In order to optimize an outage in terms of performance time and cost, there are a number of starting points based on certain key factors: organization, planning, logistics, performance monitoring, plant and equipment enhancements as well as personnel motivation. To reach this goal it is necessary for the original equipment manufacturer (OEM) and/or service provider to be involved in these activities to a much greater extent than before and for a closer form of partnership to be established with the consumer. For it is only within a team having a common set of goals that the successes of the past have been able to be achieved and new tasks can be efficiently handled in the future. (author)

  6. Key issues for the control of refueling outage duration and costs in PWR nuclear power plants

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    2000-01-01

    For several years, EDF, within the framework of the CIDEM project and in collaboration with some German Utilities, has undertaken a detailed review of the operating experience both of its own NPP and of foreign units, in order to improve the performances of future units under design, particularly the French-German European Pressurized Reactor (EPR) project. This review made it possible to identify the key issues allowing to decrease the duration of refueling and maintenance outages. These key issues can be classified in 3 categories: Design; Maintenance and Logistic Support; Outage Management. Most key issues in the design field and some in the logistic support field have been studied and could be integrated into the design of any future PWR unit, as for the EPR project. Some of them could also be adapted to current plants, provided they are feasible and profitable. The organization must be tailored to each country, utility or period: it widely depends on the power production environment, particularly in a deregulation context. (author)

  7. LIDAR AND INS FUSION IN PERIODS OF GPS OUTAGES FOR MOBILE LASER SCANNING MAPPING SYSTEMS

    Directory of Open Access Journals (Sweden)

    I. Klein

    2012-09-01

    Full Text Available Mobile laser scanning systems are becoming an increasingly popular means to obtain 3D coverage on a large scale. To perform the mapping, the exact position of the vehicle must be known throughout the trajectory. Exact position is achieved via integration of Global Positioning Systems (GPS and Inertial Navigation Systems (INS. Yet, in urban environments, cases of complete or even partial GPS outages may occur leaving the navigation solution to rely only on the INS. The INS navigation solution degrades with time as the Inertial Measurement Unit (IMU measurements contains noise, which permeates into the navigation equations. Degradation of the position determination leads to loss of data in such segments. To circumvent such drift and its effects, we propose fusing INS with lidar data by using building edges. This detection of edges is then translated into position data, which is used as an aiding to the INS. It thereby enables the determination of the vehicle position with a satisfactory level accuracy, sufficient to perform the laser-scanning based mapping in those outage periods.

  8. Methodology if inspections to carry out the nuclear outages model; Metodologia de inspeccciones para cumplir el modelo de paradas nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Aycart, J.; Mortenson, S.; Fourquet, J. M.

    2005-07-01

    Before the nuclear generation industry was deregulated in the United States, refueling and maintenance outages in nuclear power plants usually lasted orotund 100 days. After deregulation took effect, improved capability factors and performances became more important. As a result, it became essential to reduce the critical path time during the outage, which meant that activities that had typically been done in series had to be executed in parallel. The new outage model required the development of new tools and new processes, The 360-degree platform developed by GE Energy has made it possible to execute multiple activities in parallel. Various in-vessel visual inspection (IVVI) equipments can now simultaneously perform inspections on the pressurized reactor vessel (RPV) components. The larger number of inspection equipments in turn results in a larger volume of data, with the risk of increasing the time needed for examining them and postponing the end of the analysis phase, which is critical for the outage. To decrease data analysis times, the IVVI Digitalisation process has been development. With this process, the IVVI data are sent via a high-speed transmission line to a site outside the Plant called Center of Excellence (COE), where a team of Level III experts is in charge of analyzing them. The tools for the different product lines are being developed to interfere with each other as little as possible, thus minimizing the impact of the critical path on plant refueling activities. Methods are also being developed to increase the intervals between inspection. In accordance with the guidelines of the Boiling Water Reactor Vessel and Internals project (BWRVIP), the intervals between inspections are typically longer if ultrasound volumetric inspections are performed than if the scope is limited to IVVI. (Author)

  9. Detection and Prevention of Insider Threats in Database Driven Web Services

    Science.gov (United States)

    Chumash, Tzvi; Yao, Danfeng

    In this paper, we take the first step to address the gap between the security needs in outsourced hosting services and the protection provided in the current practice. We consider both insider and outsider attacks in the third-party web hosting scenarios. We present SafeWS, a modular solution that is inserted between server side scripts and databases in order to prevent and detect website hijacking and unauthorized access to stored data. To achieve the required security, SafeWS utilizes a combination of lightweight cryptographic integrity and encryption tools, software engineering techniques, and security data management principles. We also describe our implementation of SafeWS and its evaluation. The performance analysis of our prototype shows the overhead introduced by security verification is small. SafeWS will allow business owners to significantly reduce the security risks and vulnerabilities of outsourcing their sensitive customer data to third-party providers.

  10. Exact closed form expressions for outage probability of GSC receivers over Rayleigh fading channel subject to self-interference

    KAUST Repository

    Nam, Sungsik; Hasna, Mazen Omar; Alouini, Mohamed-Slim

    2010-01-01

    in mind, we capitalize in this paper on some new order statistics results to derive exact closed-form expressions for outage probability of GSC RAKE receivers subject to self-interference over independent and identically distributed Rayleigh fading

  11. 47 CFR 4.11 - Notification and initial and final communications outage reports that must be filed by...

    Science.gov (United States)

    2010-10-01

    ... Notification shall provide: The name of the reporting entity; the date and time of onset of the outage; a brief... FEDERAL COMMUNICATIONS COMMISSION GENERAL DISRUPTIONS TO COMMUNICATIONS Reporting Requirements for... and contact telephone number by which the Commission's technical staff may contact the reporting...

  12. Accurate outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel; Yang, Hongchuan; Alouini, Mohamed-Slim

    2011-01-01

    In this paper, we investigate a dual-hop decode-and-forward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. We first derive the exact statistics of received signal-to-noise (SNR) over each hop with co-located relays, in terms of probability density function (PDF). Then, the PDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2011 IEEE.

  13. Accurate outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel

    2011-04-01

    In this paper, we investigate a dual-hop decode-and-forward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. We first derive the exact statistics of received signal-to-noise (SNR) over each hop with co-located relays, in terms of probability density function (PDF). Then, the PDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2011 IEEE.

  14. Air traffic control : good progress on interim replacement for outage-plagued system, but risks can be further reduced

    Science.gov (United States)

    1996-10-01

    Certain air traffic control(ATC) centers experienced a series of major outages, : some of which were caused by the Display Channel Complex or DCC-a mainframe : computer system that processes radar and other data into displayable images on : controlle...

  15. Outage and ser performance of an opportunistic multi-user underlay cognitive network

    KAUST Repository

    Khan, Fahd Ahmed

    2012-10-01

    Consider a multi-user underlay cognitive network where multiple cognitive users concurrently share the spectrum with a primary network and a single secondary user is selected for transmission. The channel is assumed to have independent but not identical Nakagami-m fading. Closed form expressions for the outage performance and the symbol-error-rate performance of the opportunistic multi-user secondary network are derived when a peak interference power constraint is imposed on the secondary network in addition to the limited peak transmit power of each secondary user. © 2012 IEEE.

  16. Integrated services as the key to the optimisation of refueling outages

    International Nuclear Information System (INIS)

    Ortega, Juan; Gonzalez, Roberto; Gutierrez, Jose E.

    2010-01-01

    Refueling outages at nuclear power plants are subject to demanding improvement criteria in each and every one of the activities scheduled. The management of activities on the refueling floor, including the phases of opening and closing of the reactor vessel and associated tasks relating to the reactor internals, the unloading, loading and management of the irradiated fuel and activities requested for the in-service inspection of essential primary circuit components, are interventions that have an impact on the refueling critical path and whose overall integration allows for significant optimization of the entire management of this fundamental refueling activity. For several years now, ENUSA, as the company specializing in irradiated fuel services, TECNATOM as the company responsible for the in-service inspection of critical primary side components and Westinghouse as the technology provider and specialist in the supply of plant support services, have together formed a solid working team offering this integrated refueling service to the Spanish plants. Today, the new and heightened demands regarding the training and specialization of the personnel participating in refueling outages, the need to consider contingencies in the activities scheduled and the objectives relating to the ALARA concept and safe operations require that this service include new activities providing synergies and leading to higher levels of commitment to excellence. This paper will present the service model developed, the most significant activities integrated in the service and the advantages and milestones achieved and reached during this period, compared to the conventional distributed functions model. Likewise, an analysis will be made of the new challenges that are being addressed, with a view to bringing about a more global integration. (authors)

  17. Exploiting Outage and Error Probability of Cooperative Incremental Relaying in Underwater Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Hina Nasir

    2016-07-01

    Full Text Available This paper embeds a bi-fold contribution for Underwater Wireless Sensor Networks (UWSNs; performance analysis of incremental relaying in terms of outage and error probability, and based on the analysis proposition of two new cooperative routing protocols. Subject to the first contribution, a three step procedure is carried out; a system model is presented, the number of available relays are determined, and based on cooperative incremental retransmission methodology, closed-form expressions for outage and error probability are derived. Subject to the second contribution, Adaptive Cooperation in Energy (ACE efficient depth based routing and Enhanced-ACE (E-ACE are presented. In the proposed model, feedback mechanism indicates success or failure of data transmission. If direct transmission is successful, there is no need for relaying by cooperative relay nodes. In case of failure, all the available relays retransmit the data one by one till the desired signal quality is achieved at destination. Simulation results show that the ACE and E-ACE significantly improves network performance, i.e., throughput, when compared with other incremental relaying protocols like Cooperative Automatic Repeat reQuest (CARQ. E-ACE and ACE achieve 69% and 63% more throughput respectively as compared to CARQ in hard underwater environment.

  18. Key Issues for the control of refueling outage duration and costs in PWR Nuclear Power Plants

    International Nuclear Information System (INIS)

    Degrave, Claude

    2002-01-01

    For several years, EDF, within the framework of the CIDEM1 project and in collaboration with some German Utilities, has undertaken a detailed review of the operating experience both of its own NPP and of foreign units, in order to improve the performances of future units under design, particularly the French-German European Pressurized Reactor (EPR) project. This review made it possible to identify the key issues allowing to decrease the duration of refueling and maintenance outages. These key issues can be classified in 3 categories Design, Maintenance and Logistic Support, Outage Management. Most of the key issues in the design field and some in the logistic support field have been studied and could be integrated into the design of any future PWR unit, as for the EPR project. Some of them could also be adapted to current plants, provided they are feasible and profitable. The organization must be tailored to each country, utility or period: it widely depends on the power production environment, particularly in a deregulation context. (author)

  19. Energy markets : refinery outages can have varying gasoline price impacts, but gaps in federal data limit understanding of impacts.

    Science.gov (United States)

    2009-07-01

    In 2008, GAO reported that, with : the exception of the period : following Hurricanes Katrina and : Rita, refinery outages in the United : States did not show discernible : trends in reduced production : capacity, frequency, and location : from 2002 ...

  20. Outage and BER analysis for ultrawideband-based WPAN in Nakagami-m fading channels

    KAUST Repository

    Mehbodniya, Abolfazl

    2011-09-01

    This paper presents a performance analysis of multiband orthogonal frequency-division multiplexing (MB-OFDM) in ultra wideband (UWB)-based personal area networks (UPANs). A UPAN consists of devices with different UWB technologies at the physical layer. Approximate expressions for the outage probability and average bit error rate (BER) are derived in closed form for the MB-OFDM target receiver, taking into account multi-user interference (MUI), as well as external interference in the form of time-hopping (TH) and direct-sequence (DS) UWB signals. © 2010 IEEE.

  1. Exact closed form expressions for outage probability of GSC receivers over Rayleigh fading channel subject to self-interference

    KAUST Repository

    Nam, Sungsik

    2010-11-01

    Previous work on performance analyses of generalized selection combining (GSC) RAKE receivers based on the signal to noise ratio focused on the development of methodologies to derive exact closed-form expressions for various performance measures. However, some open problems related to the performance evaluation of GSC RAKE receivers still remain to be solved such that an assessment of the impact of self-interference on the performance of GSC RAKE receivers. To have a full and exact understanding of the performance of GSC RAKE receivers, the outage probability of GSC RAKE receivers needs to be analyzed as closed-form expressions. The major difficulty in this problem is to derive some joint statistics of ordered exponential variates. With this motivation in mind, we capitalize in this paper on some new order statistics results to derive exact closed-form expressions for outage probability of GSC RAKE receivers subject to self-interference over independent and identically distributed Rayleigh fading channels. © 2010 IEEE.

  2. Using Rapid Improvement Events for Disaster After-Action Reviews: Experience in a Hospital Information Technology Outage and Response.

    Science.gov (United States)

    Little, Charles M; McStay, Christopher; Oeth, Justin; Koehler, April; Bookman, Kelly

    2018-02-01

    The use of after-action reviews (AARs) following major emergency events, such as a disaster, is common and mandated for hospitals and similar organizations. There is a recurrent challenge of identified problems not being resolved and repeated in subsequent events. A process improvement technique called a rapid improvement event (RIE) was used to conduct an AAR following a complete information technology (IT) outage at a large urban hospital. Using RIE methodology to conduct the AAR allowed for the rapid development and implementation of major process improvements to prepare for future IT downtime events. Thus, process improvement methodology, particularly the RIE, is suited for conducting AARs following disasters and holds promise for improving outcomes in emergency management. Little CM , McStay C , Oeth J , Koehler A , Bookman K . Using rapid improvement events for disaster after-action reviews: experience in a hospital information technology outage and response. Prehosp Disaster Med. 2018;33(1):98-100.

  3. Proposed plan for the K-Area Bingham Pump Outage Pit (643-1G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1997-06-01

    This Proposed Plan is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this Proposed Plan is to describe the preferred remedial alternative for addressing the K-Area Bingham Pump Outage Pit (643-1G) (K BPOP) located at the Savannah River Site (SRS) in Aiken, South Carolina and to solicit public comments on the preferred alternative

  4. [Good practices and techniques for prevention of accidents at work and occupational diseases. New database of Inail].

    Science.gov (United States)

    Bindi, L; Ossicini, A

    2007-01-01

    The project "The publication of good practices and good techniques for prevention" is one the priorities of nail. This computerized system for the collection of good practices and standards of Good Technology is aimed to health and safety of workers. The basic objective of the database is to provide a valuable tool, usable, dynamic and implemented, in order to facilitate and direct the access to BP and BT it by people responsible for SSL. At the same time constitutes a tool strategically important for enterprises (especially SMEs) in terms of technological innovation and competitiveness, related to the prevention, safety and health of workers. The realization of this project has involved many of the professionals (chemists, engineers, doctors, biologists, geologists, etc.), and everyone gives his intake of qualified professional competence.

  5. Braess's paradox in oscillator networks, desynchronization and power outage

    International Nuclear Information System (INIS)

    Witthaut, Dirk; Timme, Marc

    2012-01-01

    Robust synchronization is essential to ensure the stable operation of many complex networked systems such as electric power grids. Increasing energy demands and more strongly distributing power sources raise the question of where to add new connection lines to the already existing grid. Here we study how the addition of individual links impacts the emergence of synchrony in oscillator networks that model power grids on coarse scales. We reveal that adding new links may not only promote but also destroy synchrony and link this counter-intuitive phenomenon to Braess's paradox known for traffic networks. We analytically uncover its underlying mechanism in an elementary grid example, trace its origin to geometric frustration in phase oscillators, and show that it generically occurs across a wide range of systems. As an important consequence, upgrading the grid requires particular care when adding new connections because some may destabilize the synchronization of the grid—and thus induce power outages. (paper)

  6. On the Required Number of Antennas in a Point-to-Point Large-but-Finite MIMO System: Outage-Limited Scenario

    KAUST Repository

    Makki, Behrooz

    2016-03-22

    This paper investigates the performance of the point-To-point multiple-input-multiple-output (MIMO) systems in the presence of a large but finite numbers of antennas at the transmitters and/or receivers. Considering the cases with and without hybrid automatic repeat request (HARQ) feedback, we determine the minimum numbers of the transmit/receive antennas, which are required to satisfy different outage probability constraints. Our results are obtained for different fading conditions and the effect of the power amplifiers efficiency/feedback error probability on the performance of the MIMO-HARQ systems is analyzed. Then, we use some recent results on the achievable rates of finite block-length codes, to analyze the effect of the codewords lengths on the system performance. Moreover, we derive closed-form expressions for the asymptotic performance of the MIMO-HARQ systems when the number of antennas increases. Our analytical and numerical results show that different outage requirements can be satisfied with relatively few transmit/receive antennas. © 1972-2012 IEEE.

  7. Scale models: A proven cost-effective tool for outage planning

    Energy Technology Data Exchange (ETDEWEB)

    Lee, R. [Commonwealth Edison Co., Morris, IL (United States); Segroves, R. [Sargent & Lundy, Chicago, IL (United States)

    1995-03-01

    As generation costs for operating nuclear stations have risen, more nuclear utilities have initiated efforts to improve cost effectiveness. Nuclear plant owners are also being challenged with lower radiation exposure limits and new revised radiation protection related regulations (10 CFR 20), which places further stress on their budgets. As source term reduction activities continue to lower radiation fields, reducing the amount of time spent in radiation fields becomes one of the most cost-effective ways of reducing radiation exposure. An effective approach for minimizing time spent in radiation areas is to use a physical scale model for worker orientation planning and monitoring maintenance, modifications, and outage activities. To meet the challenge of continued reduction in the annual cumulative radiation exposures, new cost-effective tools are required. One field-tested and proven tool is the physical scale model.

  8. Vaccine-preventable, hospitalizations among American Indian/Alaska Native children using the 2012 Kid's Inpatient Database.

    Science.gov (United States)

    Nickel, Amanda J; Puumala, Susan E; Kharbanda, Anupam B

    2018-02-08

    Our aim was to assess the odds of hospitalization for a vaccine-preventable, infectious disease (VP-ID) in American Indian/Alaska Native (AI/AN) children compared to other racial and ethnic groups using the 2012 Kid's Inpatient Database (KID) The KID is a nationally representative sample, which allows for evaluation of VP-ID in a non-federal, non-Indian Health Service setting. In a cross-sectional analysis, we evaluated the association of race/ethnicity and a composite outcome of hospitalization due to vaccine-preventable infection using multivariate logistic regression. AI/AN children were more likely (OR=1.81, 95% CI=1.34, 2.45) to be admitted to the hospital in 2012 for a VP-ID compared to Non-Hispanic white children after adjusting for age, sex, chronic disease status, metropolitan location, and median household income. This disparity highlights the necessity for a more comprehensive understanding of immunization and infectious disease exposure among American Indian children, especially those not covered or evaluated by Indian Health Service. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Network and Database Security: Regulatory Compliance, Network, and Database Security - A Unified Process and Goal

    Directory of Open Access Journals (Sweden)

    Errol A. Blake

    2007-12-01

    Full Text Available Database security has evolved; data security professionals have developed numerous techniques and approaches to assure data confidentiality, integrity, and availability. This paper will show that the Traditional Database Security, which has focused primarily on creating user accounts and managing user privileges to database objects are not enough to protect data confidentiality, integrity, and availability. This paper is a compilation of different journals, articles and classroom discussions will focus on unifying the process of securing data or information whether it is in use, in storage or being transmitted. Promoting a change in Database Curriculum Development trends may also play a role in helping secure databases. This paper will take the approach that if one make a conscientious effort to unifying the Database Security process, which includes Database Management System (DBMS selection process, following regulatory compliances, analyzing and learning from the mistakes of others, Implementing Networking Security Technologies, and Securing the Database, may prevent database breach.

  10. Outage performance of two-way DF relaying systems with a new relay selection metric

    KAUST Repository

    Hyadi, Amal

    2012-04-01

    This paper investigates a new constrained relay selection scheme for two-way relaying systems where two end terminals communicate simultaneously via a relay. The introduced technique is based on the maximization of the weighted sum rate of both users. To evaluate the performance of the proposed system, the outage probability is derived in a general case (where an arbitrary channel is considered), and then over independently but not necessarily identically distributed (i.n.i.d.) Rayleigh fading channels. The analytical results are verified through simulations. © 2012 IEEE.

  11. Sample Results from MCU Solids Outage

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T.; Washington, A.; Oji, L.; Coleman, C.; Poirier, M.

    2014-09-22

    Savannah River National Laboratory (SRNL) has received several solid and liquid samples from MCU in an effort to understand and recover from the system outage starting on April 6, 2014. SRNL concludes that the presence of solids in the Salt Solution Feed Tank (SSFT) is the likely root cause for the outage, based upon the following discoveries: A solids sample from the extraction contactor #1 proved to be mostly sodium oxalate; A solids sample from the scrub contactor#1 proved to be mostly sodium oxalate; A solids sample from the Salt Solution Feed Tank (SSFT) proved to be mostly sodium oxalate; An archived sample from Tank 49H taken last year was shown to contain a fine precipitate of sodium oxalate; A solids sample from ; A liquid sample from the SSFT was shown to have elevated levels of oxalate anion compared to the expected concentration in the feed. Visual inspection of the SSFT indicated the presence of precipitated or transferred solids, which were likely also in the Salt Solution Receipt Tank (SSRT). The presence of the solids coupled with agitation performed to maintain feed temperature resulted in oxalate solids migration through the MCU system and caused hydraulic issues that resulted in unplanned phase carryover from the extraction into the scrub, and ultimately the strip contactors. Not only did this carryover result in the Strip Effluent (SE) being pushed out of waste acceptance specification, but it resulted in the deposition of solids into several of the contactors. At the same time, extensive deposits of aluminosilicates were found in the drain tube in the extraction contactor #1. However it is not known at this time how the aluminosilicate solids are related to the oxalate solids. The solids were successfully cleaned out of the MCU system. However, future consideration must be given to the exclusion of oxalate solids into the MCU system. There were 53 recommendations for improving operations recently identified. Some additional considerations or

  12. Outage probability of dual-hop FSO fixed gain relay transmission systems

    KAUST Repository

    Zedini, Emna

    2016-12-24

    In this paper, we analyze the end-to-end performance of dual-hop free-space optical (FSO) fixed gain relaying systems in the presence of atmospheric turbulence as well as pointing errors. More specifically, an exact closed-form expression for the outage probability is presented in terms of the bivariate Fox\\'s H function that accounts for both heterodyne detection as well as intensity modulation with direct detection. At high signal-to-noise ratio (SNR) regime, we provide very tight asymptotic result for this performance metric in terms of simple elementary functions. By using dual-hop FSO relaying, we demonstrate a better system performance as compared to the single FSO link. Numerical and Monte-Carlo simulation results are provided to verify the accuracy of the newly proposed results, and a perfect agreement is observed.

  13. Signal Quality Outage Analysis for Ultra-Reliable Communications in Cellular Networks

    DEFF Research Database (Denmark)

    Gerardino, Guillermo Andrés Pocovi; Alvarez, Beatriz Soret; Lauridsen, Mads

    2015-01-01

    Ultra-reliable communications over wireless will open the possibility for a wide range of novel use cases and applications. In cellular networks, achieving reliable communication is challenging due to many factors, particularly the fading of the desired signal and the interference. In this regard......, we investigate the potential of several techniques to combat these main threats. The analysis shows that traditional microscopic multiple-input multiple-output schemes with 2x2 or 4x4 antenna configurations are not enough to fulfil stringent reliability requirements. It is revealed how such antenna...... schemes must be complemented with macroscopic diversity as well as interference management techniques in order to ensure the necessary SINR outage performance. Based on the obtained performance results, it is discussed which of the feasible options fulfilling the ultra-reliable criteria are most promising...

  14. On the Efficient Simulation of the Distribution of the Sum of Gamma-Gamma Variates with Application to the Outage Probability Evaluation Over Fading Channels

    KAUST Repository

    Ben Issaid, Chaouki

    2017-01-26

    The Gamma-Gamma distribution has recently emerged in a number of applications ranging from modeling scattering and reverberation in sonar and radar systems to modeling atmospheric turbulence in wireless optical channels. In this respect, assessing the outage probability achieved by some diversity techniques over this kind of channels is of major practical importance. In many circumstances, this is related to the difficult question of analyzing the statistics of a sum of Gamma- Gamma random variables. Answering this question is not a simple matter. This is essentially because outage probabilities encountered in practice are often very small, and hence the use of classical Monte Carlo methods is not a reasonable choice. This lies behind the main motivation of the present work. In particular, this paper proposes a new approach to estimate the left tail of the sum of Gamma-Gamma variates. More specifically, we propose robust importance sampling schemes that efficiently evaluates the outage probability of diversity receivers over Gamma-Gamma fading channels. The proposed estimators satisfy the well-known bounded relative error criterion for both maximum ratio combining and equal gain combining cases. We show the accuracy and the efficiency of our approach compared to naive Monte Carlo via some selected numerical simulations.

  15. Insights from the analyses of risk-informed extension of diesel generator allowed outage time

    International Nuclear Information System (INIS)

    Lin, J.C.; He Wei

    2005-01-01

    In recent years, many U.S. nuclear plants have applied and received approval for the risk-informed extension of the Allowed Outage Time (AOT) for Emergency Diesel Generators (EDGs). These risk-informed applications need to meet the regulatory guidance on the risk criteria. This paper discusses in detail insights derived from the risk-informed analyses performed to support these applications. The risk criteria on ΔCDF/ΔLERF evaluate the increase in average risk by extending the AOT for EDGs, induced primarily by an increase in EDG maintenance unavailability due to the introduction of additional EDG preventive maintenance. By performing this preventive maintenance work on-line, the outage duration can be shortened. With proper refinement of the risk model, most plants can meet the ΔCDF/ΔLERF criteria for extending the EDGAOT from, for example, 3 days to 14 days. The key areas for model enhancements to meet these criteria include offsite/onsite power recovery, LERF modeling, etc. The most important LERF model enhancements consist of refinement of the penetrations included in the containment isolation model for the consideration of a large release, and taking credit for operator vessel depressurization during the time period between core damage and vessel failure. A recent study showed that although the frequency of loss of offsite power (LOSP) has decreased, the duration of offsite power recovery has actually increased. However, many of the events used to derive this conclusion may not be applicable to PRAs. One approach develops the offsite power non-recovery factor by first screening the LOSP events for applicability to the plant being analyzed, power operation, and LOSP initiating event, then using the remaining events data for the derivation based on the fraction of events with recovery duration longer than the time window allowed. The risk criteria on ICCDP/ICLERP examine the increase in risk from the average CDF/LERF, based on the increased maintenance

  16. A study on assessment methodology of surveillance test interval and allowed outage time

    International Nuclear Information System (INIS)

    Che, Moo Seong; Cheong, Chang Hyeon; Lee, Byeong Cheol

    1996-07-01

    The objectives of this study is the development of methodology by which assessing the optimizes Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korea nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches is performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method

  17. A study on assessment methodology of surveillance test interval and allowed outage time

    Energy Technology Data Exchange (ETDEWEB)

    Che, Moo Seong; Cheong, Chang Hyeon; Lee, Byeong Cheol [Seoul Nationl Univ., Seoul (Korea, Republic of)] (and others)

    1996-07-15

    The objectives of this study is the development of methodology by which assessing the optimizes Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korea nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches is performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method.

  18. Improving burn care and preventing burns by establishing a burn database in Ukraine.

    Science.gov (United States)

    Fuzaylov, Gennadiy; Murthy, Sushila; Dunaev, Alexander; Savchyn, Vasyl; Knittel, Justin; Zabolotina, Olga; Dylewski, Maggie L; Driscoll, Daniel N

    2014-08-01

    Burns are a challenge for trauma care and a contribution to the surgical burden. The former Soviet republic of Ukraine has a foundation for burn care; however data concerning burns in Ukraine has historically been scant. The objective of this paper was to compare a new burn database to identify problems and implement improvements in burn care and prevention in this country. Retrospective analyses of demographic and clinical data of burn patients including Tukey's post hoc test, analysis of variance, and chi square analyses, and Fisher's exact test were used. Data were compared to the American Burn Association (ABA) burn repository. This study included 1752 thermally injured patients treated in 20 hospitals including Specialized Burn Unit in Municipal Hospital #8 Lviv, Lviv province in Ukraine. Scald burns were the primary etiology of burns injuries (70%) and burns were more common among children less than five years of age (34%). Length of stay, mechanical ventilation use, infection rates, and morbidity increased with greater burn size. Mortality was significantly related to burn size, inhalation injury, age, and length of stay. Wound infections were associated with burn size and older age. Compared to ABA data, Ukrainian patients had double the length of stay and a higher rate of wound infections (16% vs. 2.4%). We created one of the first burn databases from a region of the former Soviet Union in an effort to bring attention to burn injury and improve burn care. Copyright © 2013 Elsevier Ltd and ISBI. All rights reserved.

  19. R and D proposals to improve outages operation. Methods, practices and tools

    International Nuclear Information System (INIS)

    Dionis, Francois

    2014-01-01

    This paper deals with outage operation improvement. It offers a number of tracks on the interactions between the operation activities and maintenance, with a methodological perspective and proposals concerning the Information System. On the methodological point of view, a clever plant systems modeling may allow representing the needed characteristics in order to optimize tagouts, alignment procedures and the schedule. Tools must be taken n into account for new tagout practices such as tags sharing. It is possible to take advantage of 2D drawings integrated into the information system in order to improve the data controls and to visualize operation activities. An integrated set of mobile applications should allow field operators to join the information system for a better and safer performance. (author)

  20. Asymmetric Hardware Distortions in Receive Diversity Systems: Outage Performance Analysis

    KAUST Repository

    Javed, Sidrah; Amin, Osama; Ikki, Salama S.; Alouini, Mohamed-Slim

    2017-01-01

    This paper studies the impact of asymmetric hardware distortion (HWD) on the performance of receive diversity systems using linear and switched combining receivers. The asymmetric attribute of the proposed model motivates the employment of improper Gaussian signaling (IGS) scheme rather than the traditional proper Gaussian signaling (PGS) scheme. The achievable rate performance is analyzed for the ideal and non-ideal hardware scenarios using PGS and IGS transmission schemes for different combining receivers. In addition, the IGS statistical characteristics are optimized to maximize the achievable rate performance. Moreover, the outage probability performance of the receive diversity systems is analyzed yielding closed form expressions for both PGS and IGS based transmission schemes. HWD systems that employ IGS is proven to efficiently combat the self interference caused by the HWD. Furthermore, the obtained analytic expressions are validated through Monte-Carlo simulations. Eventually, non-ideal hardware transceivers degradation and IGS scheme acquired compensation are quantified through suitable numerical results.

  1. Asymmetric Hardware Distortions in Receive Diversity Systems: Outage Performance Analysis

    KAUST Repository

    Javed, Sidrah

    2017-02-22

    This paper studies the impact of asymmetric hardware distortion (HWD) on the performance of receive diversity systems using linear and switched combining receivers. The asymmetric attribute of the proposed model motivates the employment of improper Gaussian signaling (IGS) scheme rather than the traditional proper Gaussian signaling (PGS) scheme. The achievable rate performance is analyzed for the ideal and non-ideal hardware scenarios using PGS and IGS transmission schemes for different combining receivers. In addition, the IGS statistical characteristics are optimized to maximize the achievable rate performance. Moreover, the outage probability performance of the receive diversity systems is analyzed yielding closed form expressions for both PGS and IGS based transmission schemes. HWD systems that employ IGS is proven to efficiently combat the self interference caused by the HWD. Furthermore, the obtained analytic expressions are validated through Monte-Carlo simulations. Eventually, non-ideal hardware transceivers degradation and IGS scheme acquired compensation are quantified through suitable numerical results.

  2. Limiting the impact of recent outage experience in a midsize university reactor environment

    International Nuclear Information System (INIS)

    Vernetson, W.G.

    1996-01-01

    The University of Florida Training Reactor (UFTR) is a light-water-cooled, graphite- and light-water-moderated, modified Argonaut-type reactor licensed to operate at steady-state power levels up to 100 kW. The UFTR continues to utilize high-enriched materials test reactor-type fuel in a piping circuit type of system versus the more familiar pool reactor design. Though somewhat limited for research and service, the UFTR is a valuable educational facility. Despite its relatively low power level, the two-slab core configuration provides a peak thermal flux near 2 x 10 12 n/cm 2 · s; in addition, other modifications and experimental adaptations have been implemented in the 36-yr history of the facility to enhance the potential of the facility for diverse types of unique educational usage. Its small physical size in a loop configuration makes it a good teaching tool, but it can also be associated with unique maintenance problems, as in this case. The mission of the UFTR is to serve regional needs for access to quality reactor usage in a variety of areas to support educational and training needs as well as research and service, including public information about nuclear energy. As the only nonpower reactor in the state of Florida in affiliation with an established and diverse nuclear and radiological engineering department, it has a strong role to play in education, training, research, and service, especially the former. As a result of its unique position, the facility has been quite successful in its mission. With so much educational usage scheduled, sometimes for classes arriving from 100 miles away, it is important to avoid unexpected outages as well as unexpectedly lengthy outages. Such planning usually is successful and has allowed the RFTR to build a clientele of more than four dozen regular educational users, although events in 1995 could have undetermined this effort

  3. On the Efficient Simulation of the Distribution of the Sum of Gamma-Gamma Variates with Application to the Outage Probability Evaluation Over Fading Channels

    KAUST Repository

    Ben Issaid, Chaouki

    2016-06-01

    The Gamma-Gamma distribution has recently emerged in a number of applications ranging from modeling scattering and reverbation in sonar and radar systems to modeling atmospheric turbulence in wireless optical channels. In this respect, assessing the outage probability achieved by some diversity techniques over this kind of channels is of major practical importance. In many circumstances, this is intimately related to the difficult question of analyzing the statistics of a sum of Gamma-Gamma random variables. Answering this question is not a simple matter. This is essentially because outage probabilities encountered in practice are often very small, and hence the use of classical Monte Carlo methods is not a reasonable choice. This lies behind the main motivation of the present work. In particular, this paper proposes a new approach to estimate the left tail of the sum of Gamma-Gamma variates. More specifically, we propose a mean-shift importance sampling scheme that efficiently evaluates the outage probability of L-branch maximum ratio combining diversity receivers over Gamma-Gamma fading channels. The proposed estimator satisfies the well-known bounded relative error criterion, a well-desired property characterizing the robustness of importance sampling schemes, for both identically and non-identically independent distributed cases. We show the accuracy and the efficiency of our approach compared to naive Monte Carlo via some selected numerical simulations.

  4. On the Efficient Simulation of the Distribution of the Sum of Gamma-Gamma Variates with Application to the Outage Probability Evaluation Over Fading Channels

    KAUST Repository

    Ben Issaid, Chaouki; Ben Rached, Nadhir; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2016-01-01

    The Gamma-Gamma distribution has recently emerged in a number of applications ranging from modeling scattering and reverbation in sonar and radar systems to modeling atmospheric turbulence in wireless optical channels. In this respect, assessing the outage probability achieved by some diversity techniques over this kind of channels is of major practical importance. In many circumstances, this is intimately related to the difficult question of analyzing the statistics of a sum of Gamma-Gamma random variables. Answering this question is not a simple matter. This is essentially because outage probabilities encountered in practice are often very small, and hence the use of classical Monte Carlo methods is not a reasonable choice. This lies behind the main motivation of the present work. In particular, this paper proposes a new approach to estimate the left tail of the sum of Gamma-Gamma variates. More specifically, we propose a mean-shift importance sampling scheme that efficiently evaluates the outage probability of L-branch maximum ratio combining diversity receivers over Gamma-Gamma fading channels. The proposed estimator satisfies the well-known bounded relative error criterion, a well-desired property characterizing the robustness of importance sampling schemes, for both identically and non-identically independent distributed cases. We show the accuracy and the efficiency of our approach compared to naive Monte Carlo via some selected numerical simulations.

  5. A Generic Simulation Approach for the Fast and Accurate Estimation of the Outage Probability of Single Hop and Multihop FSO Links Subject to Generalized Pointing Errors

    KAUST Repository

    Ben Issaid, Chaouki; Park, Kihong; Alouini, Mohamed-Slim

    2017-01-01

    When assessing the performance of the free space optical (FSO) communication systems, the outage probability encountered is generally very small, and thereby the use of nave Monte Carlo simulations becomes prohibitively expensive. To estimate these rare event probabilities, we propose in this work an importance sampling approach which is based on the exponential twisting technique to offer fast and accurate results. In fact, we consider a variety of turbulence regimes, and we investigate the outage probability of FSO communication systems, under a generalized pointing error model based on the Beckmann distribution, for both single and multihop scenarios. Selected numerical simulations are presented to show the accuracy and the efficiency of our approach compared to naive Monte Carlo.

  6. A Generic Simulation Approach for the Fast and Accurate Estimation of the Outage Probability of Single Hop and Multihop FSO Links Subject to Generalized Pointing Errors

    KAUST Repository

    Ben Issaid, Chaouki

    2017-07-28

    When assessing the performance of the free space optical (FSO) communication systems, the outage probability encountered is generally very small, and thereby the use of nave Monte Carlo simulations becomes prohibitively expensive. To estimate these rare event probabilities, we propose in this work an importance sampling approach which is based on the exponential twisting technique to offer fast and accurate results. In fact, we consider a variety of turbulence regimes, and we investigate the outage probability of FSO communication systems, under a generalized pointing error model based on the Beckmann distribution, for both single and multihop scenarios. Selected numerical simulations are presented to show the accuracy and the efficiency of our approach compared to naive Monte Carlo.

  7. Unified Importance Sampling Schemes for Efficient Simulation of Outage Capacity over Generalized Fading Channels

    KAUST Repository

    Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2015-01-01

    The outage capacity (OC) is among the most important performance metrics of communication systems operating over fading channels. Of interest in the present paper is the evaluation of the OC at the output of the Equal Gain Combining (EGC) and the Maximum Ratio Combining (MRC) receivers. In this case, it can be seen that this problem turns out to be that of computing the Cumulative Distribution Function (CDF) for the sum of independent random variables. Since finding a closedform expression for the CDF of the sum distribution is out of reach for a wide class of commonly used distributions, methods based on Monte Carlo (MC) simulations take pride of price. In order to allow for the estimation of the operating range of small outage probabilities, it is of paramount importance to develop fast and efficient estimation methods as naive Monte Carlo (MC) simulations would require high computational complexity. In this line, we propose in this work two unified, yet efficient, hazard rate twisting Importance Sampling (IS) based approaches that efficiently estimate the OC of MRC or EGC diversity techniques over generalized independent fading channels. The first estimator is shown to possess the asymptotic optimality criterion and applies for arbitrary fading models, whereas the second one achieves the well-desired bounded relative error property for the majority of the well-known fading variates. Moreover, the second estimator is shown to achieve the asymptotic optimality property under the particular Log-normal environment. Some selected simulation results are finally provided in order to illustrate the substantial computational gain achieved by the proposed IS schemes over naive MC simulations.

  8. Unified Importance Sampling Schemes for Efficient Simulation of Outage Capacity over Generalized Fading Channels

    KAUST Repository

    Rached, Nadhir B.

    2015-11-13

    The outage capacity (OC) is among the most important performance metrics of communication systems operating over fading channels. Of interest in the present paper is the evaluation of the OC at the output of the Equal Gain Combining (EGC) and the Maximum Ratio Combining (MRC) receivers. In this case, it can be seen that this problem turns out to be that of computing the Cumulative Distribution Function (CDF) for the sum of independent random variables. Since finding a closedform expression for the CDF of the sum distribution is out of reach for a wide class of commonly used distributions, methods based on Monte Carlo (MC) simulations take pride of price. In order to allow for the estimation of the operating range of small outage probabilities, it is of paramount importance to develop fast and efficient estimation methods as naive Monte Carlo (MC) simulations would require high computational complexity. In this line, we propose in this work two unified, yet efficient, hazard rate twisting Importance Sampling (IS) based approaches that efficiently estimate the OC of MRC or EGC diversity techniques over generalized independent fading channels. The first estimator is shown to possess the asymptotic optimality criterion and applies for arbitrary fading models, whereas the second one achieves the well-desired bounded relative error property for the majority of the well-known fading variates. Moreover, the second estimator is shown to achieve the asymptotic optimality property under the particular Log-normal environment. Some selected simulation results are finally provided in order to illustrate the substantial computational gain achieved by the proposed IS schemes over naive MC simulations.

  9. IAEA Coordinated Research Project on the Establishment of a Material Properties Database for Irradiated Core Structural Components for Continued Safe Operation and Lifetime Extension of Ageing Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Borio Di Tigliole, A.; Schaaf, Van Der; Barnea, Y.; Bradley, E.; Morris, C.; Rao, D. V. H. [Research Reactor Section, Vianna (Australia); Shokr, A. [Research Reactor Safety Section, Vienna (Australia); Zeman, A. [International Atomic Energy Agency, Vienna (Australia)

    2013-07-01

    Today more than 50% of operating Research Reactors (RRs) are over 45 years old. Thus, ageing management is one of the most important issues to face in order to ensure availability (including life extension), reliability and safe operation of these facilities for the future. Management of the ageing process requires, amongst others, the predictions for the behavior of structural materials of primary components subjected to irradiation such as reactor vessel and core support structures, many of which are extremely difficult or impossible to replace. In fact, age-related material degradation mechanisms resulted in high profile, unplanned and lengthy shutdowns and unique regulatory processes of relicensing the facilities in recent years. These could likely have been prevented by utilizing available data for the implementation of appropriate maintenance and surveillance programmes. This IAEA Coordinated Research Project (CRP) will provide an international forum to establish a material properties Database for irradiated core structural materials and components. It is expected that this Database will be used by research reactor operators and regulators to help predict ageing related degradation. This would be useful to minimize unpredicted outages due to ageing processes of primary components and to mitigate lengthy and costly shutdowns. The Database will be a compilation of data from RRs operators' inputs, comprehensive literature reviews and experimental data from RRs. Moreover, the CRP will specify further activities needed to be addressed in order to bridge the gaps in the new created Database, for potential follow-on activities. As per today, 13 Member States (MS) confirmed their agreement to contribute to the development of the Database, covering a wide number of materials and properties. The present publication incorporates two parts: the first part includes details on the pre-CRP Questionnaire, including the conclusions drawn from the answers received from

  10. IAEA Coordinated Research Project on the Establishment of a Material Properties Database for Irradiated Core Structural Components for Continued Safe Operation and Lifetime Extension of Ageing Research Reactors

    International Nuclear Information System (INIS)

    Borio Di Tigliole, A.; Schaaf, Van Der; Barnea, Y.; Bradley, E.; Morris, C.; Rao, D. V. H.; Shokr, A.; Zeman, A.

    2013-01-01

    Today more than 50% of operating Research Reactors (RRs) are over 45 years old. Thus, ageing management is one of the most important issues to face in order to ensure availability (including life extension), reliability and safe operation of these facilities for the future. Management of the ageing process requires, amongst others, the predictions for the behavior of structural materials of primary components subjected to irradiation such as reactor vessel and core support structures, many of which are extremely difficult or impossible to replace. In fact, age-related material degradation mechanisms resulted in high profile, unplanned and lengthy shutdowns and unique regulatory processes of relicensing the facilities in recent years. These could likely have been prevented by utilizing available data for the implementation of appropriate maintenance and surveillance programmes. This IAEA Coordinated Research Project (CRP) will provide an international forum to establish a material properties Database for irradiated core structural materials and components. It is expected that this Database will be used by research reactor operators and regulators to help predict ageing related degradation. This would be useful to minimize unpredicted outages due to ageing processes of primary components and to mitigate lengthy and costly shutdowns. The Database will be a compilation of data from RRs operators' inputs, comprehensive literature reviews and experimental data from RRs. Moreover, the CRP will specify further activities needed to be addressed in order to bridge the gaps in the new created Database, for potential follow-on activities. As per today, 13 Member States (MS) confirmed their agreement to contribute to the development of the Database, covering a wide number of materials and properties. The present publication incorporates two parts: the first part includes details on the pre-CRP Questionnaire, including the conclusions drawn from the answers received from the MS

  11. Investigation on cause of outage of Wide Range Monitor (WRM) in High Temperature engineering Test Reactor (HTTR). Post Irradiation Examination (PIE) toward investigation of the cause

    International Nuclear Information System (INIS)

    Shinohara, Masanori; Saito, Kenji; Takada, Shoji; Ishimi, Akihiro; Katsuyama, Kozo; Motegi, Toshihiro

    2012-08-01

    An event, in which one of WRMs were disabled to detect the neutron flux in the reactor core, occurred during the period of reactor shut down of HTTR in March, 2010. The actual life time of WRM was unexpectedly shorter than the past developed life time. Investigation of the cause of the outage of WRM toward the recovery of the life time up to the past developed life is one of the issues to develop the technology basis of High Temperature Gas cooled Reactor (HTGR). Then, two experimental investigations were carried out to reveal the cause of the outage by specifying the damaged part causing the event in the WRM. The one is a post irradiation examination using the X-ray computed tomography scanner in Fuels Monitoring Facility (FMF) to specify the damaged part in the WRM. The other is an experiment using a mock-up simulating the WRM fabricated by the fabricator. The characteristic impedance of the damaged WRM was measured by Time Domain Reflectometry, which was compared with that of the mock-up, which could narrow down the damaged part in the WRM. This report summarized the results of the PIE and the experimental investigation using the mock-up to reveal the cause of outage of WRM. (author)

  12. Global NDE Best Practice for Technology Improvement, Outage Management, Foreign Material Exclusion and Dose Control

    International Nuclear Information System (INIS)

    Glass, S. W.; Mohr, F.

    2010-01-01

    Non Destructive Examination (NDE) is a critical element of both Boiling Water and Pressurized Water Reactor outages. Frequently this includes critical path activity so both the utility and the inspection vendor are under intense pressure to perform the work quickly. Concurrent with AREVA's new global organization of NDE resources, AREVA NDE SOLUTIONS, efforts have intensified for global application of lessons learned and best practices. These best practices include new developments as well as continuous improvements to well established tools and NDE techniques. Advancements range from steam generator robots, advanced steam generator deposit characterization sensors and method, new phased array approaches for PWR and BWR reactor vessel examination, new sensors and approaches for RPV head examinations, plus advanced internals examination robots and methods. In addition to specialized tools and techniques, best practice includes numerous management innovations. AREVA's multi-disciplined integrated nuclear worker strategy helps to minimize the total number of personnel deployed to multi-task outages. Specific design and on-site practice has been implemented to minimize or eliminate foreign material from the reactor system and vigorous pursuit of dose management practices keeps our nuclear worker dose as low as reasonably achievable. The industry is moving to much more conservative nuclear worker dose limits. While this is proving to be an issue with many vendors, AREVA has had an internal policy of <2R since 2006. Globalizing the organization also helps AREVA manage peaks and unplanned emergency inspections from an enlarged pool of globally qualified inspection personnel and tools. (Author)

  13. An advanced maintenance advisory and surveillance system for boiler tubes - AMASS

    Energy Technology Data Exchange (ETDEWEB)

    Tomkins, A B [ERA Technology Ltd, Leatherhead (United Kingdom)

    1999-12-31

    In a recently completed European collaborative project, the aim was to address the issue of boiler tube failures and thereby plant availability. The reduction of forced outages due to component failures and the reduction of planned outages for preventative maintenance can both contribute in this respect. It has been possible to assess tube degradation due to erosion, corrosion and overheating through the use of on-line techniques (thin layer activation, corrosion probes and novel temperature sensors) and off-line techniques (cold air velocity measurements, laser shearography and measurements of steam side oxide) which have been developed in the project. These techniques have been demonstrated on an oil fired boiler in Portugal and a coal fired unit in Spain. The output from the monitoring techniques has been integrated in the AMASS maintenance advisory and surveillance system. This is a computerised system comprising a spatial database with add-on tools designed to assess data from individual monitors and to provide the user with information on tube life utilisation rates and the probability of tube failure occurring. A description of the monitoring techniques will be described along with some of the results of demonstrating them in the field. Also an overview of the computerized system and the way in which it works will be given along with examples of how it can be used to assist with preventative maintenance and to help avoid unplanned outages. (orig.) 10 refs.

  14. An advanced maintenance advisory and surveillance system for boiler tubes - AMASS

    Energy Technology Data Exchange (ETDEWEB)

    Tomkins, A.B. [ERA Technology Ltd, Leatherhead (United Kingdom)

    1998-12-31

    In a recently completed European collaborative project, the aim was to address the issue of boiler tube failures and thereby plant availability. The reduction of forced outages due to component failures and the reduction of planned outages for preventative maintenance can both contribute in this respect. It has been possible to assess tube degradation due to erosion, corrosion and overheating through the use of on-line techniques (thin layer activation, corrosion probes and novel temperature sensors) and off-line techniques (cold air velocity measurements, laser shearography and measurements of steam side oxide) which have been developed in the project. These techniques have been demonstrated on an oil fired boiler in Portugal and a coal fired unit in Spain. The output from the monitoring techniques has been integrated in the AMASS maintenance advisory and surveillance system. This is a computerised system comprising a spatial database with add-on tools designed to assess data from individual monitors and to provide the user with information on tube life utilisation rates and the probability of tube failure occurring. A description of the monitoring techniques will be described along with some of the results of demonstrating them in the field. Also an overview of the computerized system and the way in which it works will be given along with examples of how it can be used to assist with preventative maintenance and to help avoid unplanned outages. (orig.) 10 refs.

  15. High-Rate Communications Outage Recorder Operations for Optimal Payload and Science Telemetry Management Onboard the International Space Station

    Science.gov (United States)

    Shell, Michael T.; McElyea, Richard M. (Technical Monitor)

    2002-01-01

    All International Space Station (ISS) Ku-band telemetry transmits through the High-Rate Communications Outage Recorder (HCOR). The HCOR provides the recording and playback capability for all payload, science, and International Partner data streams transmitting through NASA's Ku-band antenna system. The HCOR is a solid-state memory recorder that provides recording capability to record all eight ISS high-rate data during ISS Loss-of-Signal periods. NASA payloads in the Destiny module are prime users of the HCOR; however, NASDA and ESA will also utilize the HCOR for data capture and playback of their high data rate links from the Kibo and Columbus modules. Marshall Space Flight Center's Payload Operations Integration Center manages the HCOR for nominal functions, including system configurations and playback operations. The purpose of this paper is to present the nominal operations plan for the HCOR and the plans for handling contingency operations affecting payload operations. In addition, the paper will address HCOR operation limitations and the expected effects on payload operations. The HCOR is manifested for ISS delivery on flight 9A with the HCOR backup manifested on flight 11A. The HCOR replaces the Medium-Rate Communications Outage Recorder (MCOR), which has supported payloads since flight 5A.1.

  16. Cooperative AF Relaying in Spectrum-Sharing Systems: Outage Probability Analysis under Co-Channel Interferences and Relay Selection

    KAUST Repository

    Xia, Minghua

    2012-11-01

    For cooperative amplify-and-forward (AF) relaying in spectrum-sharing wireless systems, secondary users share spectrum resources originally licensed to primary users to communicate with each other and, thus, the transmit power of secondary transmitters is strictly limited by the tolerable interference powers at primary receivers. Furthermore, the received signals at a relay and at a secondary receiver are inevitably interfered by the signals from primary transmitters. These co-channel interferences (CCIs) from concurrent primary transmission can significantly degrade the performance of secondary transmission. This paper studies the effect of CCIs on outage probability of the secondary link in a spectrum-sharing environment. In particular, in order to compensate the performance loss due to CCIs, the transmit powers of a secondary transmitter and its relaying node are respectively optimized with respect to both the tolerable interference powers at the primary receivers and the CCIs from the primary transmitters. Moreover, when multiple relays are available, the technique of opportunistic relay selection is exploited to further improve system performance with low implementation complexity. By analyzing lower and upper bounds on the outage probability of the secondary system, this study reveals that it is the tolerable interference powers at primary receivers that dominate the system performance, rather than the CCIs from primary transmitters. System designers will benefit from this result in planning and designing next-generation broadband spectrum-sharing systems.

  17. Prevention of Cold Injuries (Prevention des accidents dus au froid) (CD-ROM)

    National Research Council Canada - National Science Library

    2005-01-01

    ...; ii) To develop strategies for optimal prevention; and iii) To initiate an international database on cold induced vasodilatation and cold injury occurrence to monitor the effects of preventative measures. Objective i) and ii...

  18. OPG's approach of crediting natural circulation in outage heat sinks

    International Nuclear Information System (INIS)

    Fung, K.K.; Mackinnon, J.C.

    2001-01-01

    A review of crediting natural circulation as a backup means of removing the reactor core decay heat during an outage in Ontario Power Generation's nuclear stations was completed in 2000. The objective was to define the configurations and conditions under which natural circulation can be confidently credited as an effective heat transport mechanism for use in shutdown heat sink management. The project was an interdisciplinary program, and involved analyses in the areas of heat transport system thermalhydaulics, fuel and fuel channel thermal and mechanical behaviour, radiation physics, and probabilistic risks. The assessment shows that it is economically acceptable to credit natural circulation as a backup means of removing the core decay heat whenever the no fuel failure criteria are met. The economic risks associated with such a potential use decrease with time after shutdown. The waiting times after shutdown when there would be various levels of risks of damaging the pressure tubes and fuel bundles were derived for use in planning maintenance activities so as to minimize the economic risks. (author)

  19. The Danish Cardiac Rehabilitation Database

    Directory of Open Access Journals (Sweden)

    Zwisler AD

    2016-10-01

    The Regional Research Unit, Region Zealand, Roskilde, 19Department of Medicine, Cardiovascular Research Unit, Regional Hospital Herning, Herning, Denmark Aim of database: The Danish Cardiac Rehabilitation Database (DHRD aims to improve the quality of cardiac rehabilitation (CR to the benefit of patients with coronary heart disease (CHD.Study population: Hospitalized patients with CHD with stenosis on coronary angiography treated with percutaneous coronary intervention, coronary artery bypass grafting, or medication alone. Reporting is mandatory for all hospitals in Denmark delivering CR. The database was initially implemented in 2013 and was fully running from August 14, 2015, thus comprising data at a patient level from the latter date onward.Main variables: Patient-level data are registered by clinicians at the time of entry to CR directly into an online system with simultaneous linkage to other central patient registers. Follow-up data are entered after 6 months. The main variables collected are related to key outcome and performance indicators of CR: referral and adherence, lifestyle, patient-related outcome measures, risk factor control, and medication. Program-level online data are collected every third year.Descriptive data: Based on administrative data, approximately 14,000 patients with CHD are hospitalized at 35 hospitals annually, with 75% receiving one or more outpatient rehabilitation services by 2015. The database has not yet been running for a full year, which explains the use of approximations.Conclusion: The DHRD is an online, national quality improvement database on CR, aimed at patients with CHD. Mandatory registration of data at both patient level as well as program level is done on the database. DHRD aims to systematically monitor the quality of CR over time, in order to improve the quality of CR throughout Denmark to benefit patients. Keywords: secondary prevention, coronary heart disease, cardiovascular prevention, clinical quality registry

  20. BINARY PARTICLE SWARM OPTIMIZATION APPROACH FOR RANDOM GENERATION OUTAGE MAINTENANCE SCHEDULING

    Directory of Open Access Journals (Sweden)

    K. Suresh

    2013-01-01

    Full Text Available This paper presents a methodology for maintenance scheduling (MS of generators using binary particle swarm optimization (BPSO based probabilistic approach. The objective of this paper is to reduce the loss of load probability (LOLP for a power system. The capacity outage probability table (COPT is the initial step in creating maintenance schedule using the probabilistic levelized risk method. This paper proposes BPSO method which is used to construct the COPT. In order to mitigate the effects of probabilistic levelized risk method, BPSO based probabilistic levelized risk method is embarked on a MS problem. In order to validate the effectiveness of the proposed algorithm, case study results for simple five unit system can accomplish a significant levelization in the reliability indices that make possible to evaluate system generation system adequacy in the MS horizon of the power system. The proposed method shows better performance compared with other optimization methods and conventional method with improved search performance.

  1. On the Efficient Simulation of the Distribution of the Sum of Gamma-Gamma Variates with Application to the Outage Probability Evaluation Over Fading Channels

    KAUST Repository

    Ben Issaid, Chaouki; Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2017-01-01

    the outage probability achieved by some diversity techniques over this kind of channels is of major practical importance. In many circumstances, this is related to the difficult question of analyzing the statistics of a sum of Gamma- Gamma random variables

  2. Cluster randomized trial in the general practice research database: 2. Secondary prevention after first stroke (eCRT study: study protocol for a randomized controlled trial

    Directory of Open Access Journals (Sweden)

    Dregan Alex

    2012-10-01

    Full Text Available Abstract Background The purpose of this research is to develop and evaluate methods for conducting pragmatic cluster randomized trials in a primary care electronic database. The proposal describes one application, in a less frequent chronic condition of public health importance, secondary prevention of stroke. A related protocol in antibiotic prescribing was reported previously. Methods/Design The study aims to implement a cluster randomized trial (CRT using the electronic patient records of the General Practice Research Database (GPRD as a sampling frame and data source. The specific objective of the trial is to evaluate the effectiveness of a computer-delivered intervention at enhancing the delivery of stroke secondary prevention in primary care. GPRD family practices will be allocated to the intervention or usual care. The intervention promotes the use of electronic prompts to support adherence with the recommendations of the UK Intercollegiate Stroke Working Party and NICE guidelines for the secondary prevention of stroke in primary care. Primary outcome measure will be the difference in systolic blood pressure between intervention and control trial arms at 12-month follow-up. Secondary outcomes will be differences in serum cholesterol, prescribing of antihypertensive drugs, statins, and antiplatelet therapy. The intervention will continue for 12 months. Information on the utilization of the decision-support tools will also be analyzed. Discussion The CRT will investigate the effectiveness of using a computer-delivered intervention to reduce the risk of stroke recurrence following a first stroke event. The study will provide methodological guidance on the implementation of CRTs in electronic databases in primary care. Trial registration Current Controlled Trials ISRCTN35701810

  3. Power allocation and achievable data rate in spectrum-sharing channels under adaptive primary service outage constraints

    KAUST Repository

    Yang, Yuli

    2012-09-01

    In this paper, we focus on a cognitive radio network where adaptive modulation is adopted in primary links. The gap between the primary user (PU)\\'s received signal-to-noise ratio (SNR) and the lower SNR boundary of the modulation mode that is being used, provides an interference-tolerable zone. Based on this gap, a secondary user (SU) has an increased opportunity to access the licensed spectrum and to determine the transmit power it should use to keep the PU\\'s quality-of-service (QoS) unaffected. However, since the SU cannot obtain perfect information on the PU\\'s received SNR, it has to choose an SNR point between the lower and upper boundaries of the PU\\'s current modulation mode as if this point were the real SNR received by the PU. Considering this issue, in order to quantify the effect of the SU\\'s transmissions on the PU\\'s QoS, we define the PU\\'s service outage probability and obtain its closed-form expressions by taking into account whether the peak transmit power constraint is imposed on the secondary\\'s transmission or not. Subsequently, we derive the SU\\'s achievable data rate in closed form for counterpart scenarios. Numerical results provided here quantify the relation between the PU\\'s service outage probability and the SU\\'s achievable data rate, which further demonstrate that the higher the peak transmit power a secondary transmitter can support, the better performance the cognitive radio network can achieve. © 2012 IEEE.

  4. [Responding to patients with home mechanical ventilation after the Great East Japan Earthquake and during the planned power outages. How should we be prepared for a future disaster ?].

    Science.gov (United States)

    Takechi, Yukako

    2011-12-01

    The unprecedented earthquake(magnitude-9 in the Japanese seismic intensity scale)hit off the east coast of Japan on March 11, 2011. Consequently, there were planned power outages in the area nearby Tokyo to avoid massive blackouts caused by a stoppage of Fukushima nuclear plants.Our clinic located in Kawasaki city was also hit by the earthquake(magnitude- 5).During the period of two months(March and April 2011), we had a total of 52 patients with home respiratory care (5-TPPV, 11-NPPV and 36-HOT)at that time.Two out of three 24 hour-TPPV users had no external battery.After the earthquake, there was a 7-hour electricity failure in some areas, and a patient with ASV(adaptive servo ventilator)was living there.Moreover, 3-hour/day power outages were carried out from March 14 to March 28, affecting people's everyday lives. However, the patient had no harmful influences from the power failure because a ventilation company lent us an external battery(4-9 hour life capacity)for the patients, and we were able to avoid an emergency situation caused by the power failure.In conclusion, we ought to be prepared for patients with home mechanical ventilation in the future toward unforeseen large scale power outages.

  5. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  6. A trending database for human performance events

    International Nuclear Information System (INIS)

    Harrison, D.

    1993-01-01

    An effective Operations Experience program includes a standardized methodology for the investigation of unplanned events and a tool capable of retaining investigation data for the purpose of trending analysis. A database used in conjunction with a formalized investigation procedure for the purpose of trending unplanning event data is described. The database follows the structure of INPO's Human Performance Enhancement System for investigations. The database screens duplicate on-line the HPES evaluation Forms. All information pertaining to investigations is collected, retained and entered into the database using these forms. The database will be used for trending analysis to determine if any significant patterns exist, for tracking progress over time both within AECL and against industry standards, and for evaluating the success of corrective actions. Trending information will be used to help prevent similar occurrences

  7. Qualification of FFA treatment for the water-steam cycle as an innovative lay-up strategy for the long term outage of a CANDU-6 reactor

    International Nuclear Information System (INIS)

    Ramminger, Ute; Fandrich, Jörg; Sainz, Ricardo; Ovando, Luis; Herrera, Cecilia; Mendizabal, Maribel; Dumon, Adriana; Chocron, Mauricio

    2014-01-01

    The majority of worldwide operating Nuclear Power Plants is older than 25 years, which is accompanied with extended outage duration due to large refurbishment and upgrade programs, e.g. Steam Generator Replacement and other large component replacement. For these long term outages adequate and cost effective preservation methods are required. Normally during outages, systems and components are drained and opened to atmosphere whereas wet surfaces and moisture condensation can result in uniform corrosion of carbon steel and eventually other materials; superimposed localized corrosion is possible in presence of impurities. For those systems there are in general two different lay-up methods possible. Dry lay-up by removing all water and humidity from the components or wet lay-up with demineralized and oxygen free water and additional corrosion inhibitors. Disadvantages of these lay-up methods are: High man power and hardware efforts for performing dry lay-up. Usage of hazardous chemicals like Hydrazine. Insufficient results of both lay-up methods in case of switching between dry and wet lay-up. To improve the lay-up concept for long term outages, AREVA GmbH developed an innovative concept using FFA (Film-Forming Amines) for secondary side system lay-up. The entire water-steam cycle including the Steam Generators is treated in one step without any negative impact on the treated structural materials. This technology has been applied for the first time at NPP Embalse. Embalse Nuclear Power Station consists of a CANDU-6 reactor of 648 MWe electrical output. It is in commercial operation since 1984. The shutdown for refurbishment and preparation for the second cycle of operation that includes among other tasks the replacement of the existing steam generators and power uprating has been scheduled for 2014, which causes the necessity of a lay-up optimization in the plant. This paper deals in detail with the qualification process of the FFA treatment considering the specifics

  8. Current trends in copper theft prevention

    Energy Technology Data Exchange (ETDEWEB)

    Mastrofrancesco, A. [Electrical Safety Authority, ON (Canada)

    2009-07-01

    Copper is used in electrical wiring, water and gas piping, currency, and in household items. An increase in the price and demand for copper has made copper theft a profitable venture for some thieves. Copper consumed in North America is typically supplied by recycling. Scrap dealers may pay near-market prices for pure copper wires. However, copper theft poses a serious threat to the safety of utility workers and the public. Power outages caused by copper theft are now affecting grid reliability. This paper examined technologies and techniques used to prevent copper theft as part of a security strategy for utilities. Attempts to steal copper can leave utility substations unsecured and accessible to children. The theft of neutral grounds will cause the local distribution company (LDC) to malfunction and may cause power surges in homes as well as appliance fires. Utilities are now looking at using a hybrid steel and copper alternative to prevent copper theft. Asset identification techniques are also being used to identify the original owners of the copper and more easily prosecute thieves. Automated monitoring techniques are also being used to increase substation security. Utilities are also partnering with law enforcement agencies and pressuring governments to require scrap dealers to record who they buy from. It was concluded that strategies to prevent copper theft should be considered as part of an overall security strategy for utilities. tabs., figs.

  9. Improvement of database on glass dissolution

    International Nuclear Information System (INIS)

    Hayashi, Maki; Sasamoto, Hiroshi; Yoshikawa, Hideki

    2008-03-01

    In geological disposal system, high-level radioactive waste (HLW) glass is expected to retain radionuclide for the long term as the first barrier to prevent radionuclide release. The advancement of its performance assessment technology leads to the reliability improvement of the safety assessment of entire geological disposal system. For this purpose, phenomenological studies for improvement of scientific understanding of dissolution/alteration mechanisms, and development of robust dissolution/alteration model based on the study outcomes are indispensable. The database on glass dissolution has been developed for supporting these studies. This report describes improvement of the prototype glass database. Also, this report gives an example of the application of the database for reliability assessment of glass dissolution model. (author)

  10. Secrecy Outage of Max-Min TAS Scheme in MIMO-NOMA Systems

    KAUST Repository

    Lei, Hongjiang

    2018-04-09

    This paper considers a secure non-orthogonal multiple access system, where confidential messages are transmitted from a base station to multiple legitimate destinations and wiretapped by multiple illegitimate receivers. It is assumed that all the channels experience Nakagami-m fading model and all the nodes are equipped with multiple antennas, respectively. Both non-colluding and colluding eavesdroppers are respectively considered. Max-min (MM) transmit antenna selection (TAS) strategy is adopted to improve the secrecy performance of the target system, in which both users in user paring are considered simultaneously. In particular, closed-form expressions for the cumulative distribution function of the signal-to-interference-noise ratio at the legitimate user are derived firstly. Then we obtain the exact and asymptotic analytical results in a closed form for the secrecy outage probability of MM TAS scheme. Monte-Carlo simulation results are presented to corroborate the correctness of the analysis. The results show that the secrecy diversity order is zero and non-zero for fixed and dynamic power allocations, respectively.

  11. Secrecy Outage of Max-Min TAS Scheme in MIMO-NOMA Systems

    KAUST Repository

    Lei, Hongjiang; Zhang, Jianming; Park, Kihong; Xu, Peng; Zhang, Zufan; Pan, Gaofeng; Alouini, Mohamed-Slim

    2018-01-01

    This paper considers a secure non-orthogonal multiple access system, where confidential messages are transmitted from a base station to multiple legitimate destinations and wiretapped by multiple illegitimate receivers. It is assumed that all the channels experience Nakagami-m fading model and all the nodes are equipped with multiple antennas, respectively. Both non-colluding and colluding eavesdroppers are respectively considered. Max-min (MM) transmit antenna selection (TAS) strategy is adopted to improve the secrecy performance of the target system, in which both users in user paring are considered simultaneously. In particular, closed-form expressions for the cumulative distribution function of the signal-to-interference-noise ratio at the legitimate user are derived firstly. Then we obtain the exact and asymptotic analytical results in a closed form for the secrecy outage probability of MM TAS scheme. Monte-Carlo simulation results are presented to corroborate the correctness of the analysis. The results show that the secrecy diversity order is zero and non-zero for fixed and dynamic power allocations, respectively.

  12. Study of electrical power facilities and measures for planned outages in Japanese hemodialysis clinics after the Great East Japan Earthquake.

    Science.gov (United States)

    Ishida, Kai; Sawa, Manami; Fujiwara, Kousaku; Hirose, Minoru; Tsuruta, Harukazu; Takeuchi, Akihiro; Ikeda, Noriaki

    2013-02-01

    The Great East Japan Earthquake on 11 March 2011 caused major damage in northeastern Japan. The Kanto region experienced a massive electrical power shortage in the summer of 2011. A questionnaire was submitted to 354 hemodialysis clinics in Kanagawa prefecture and the Tokyo metropolitan area, excluding isolated islands, and 176 responses were analyzed (49.7%). The questions included evaluation of the availability of a private electricity generator, countermeasures in case of a planned outage, awareness of saving electricity, and improvement of safety of medical devices or electrical facilities after the earthquake. Only 12% of the clinics had private electricity generators and many clinics had no plans to introduce this facility. However, 96% of the clinics had established countermeasures to deal with a planned outage. Many clinics planned to provide dialysis on a different day or at a different time. All clinics had tried hard to establish procedures to save electricity in the summer of 2011, and 84% of the clinics had reconsidered and improved the safety of medical devices or electricity facilities after the earthquake. These results show that the awareness of crisis management was greatly improved in the wake of the earthquake. © 2012 The Authors. Therapeutic Apheresis and Dialysis © 2012 International Society for Apheresis.

  13. Estimation of Outage Capacity for Free Space Optical Links Over I-K and K Turbulent Channels

    Directory of Open Access Journals (Sweden)

    D. Marinos

    2011-06-01

    Full Text Available The free space optical communication systems are attracting great research and commercial interest due to their capability of transferring data, over short distances, with high rate and security, low cost demands and without licensing fees. However, their performance depends strongly on the atmospheric conditions in the link’s area. In this work, we investigate the influence of the turbulence on the outage capacity of such a system for weak to strong turbulence channels modeled by the I-K and the K-distribution and we derive closed-form expressions for its estimation. Finally, using these expressions we present numerical results for various link cases with different turbulence conditions.

  14. Failed fuel rod detection system and computerized manipulator during outages

    International Nuclear Information System (INIS)

    Boehm, H.H.; Foerch, H.

    1984-01-01

    During regular outages spent fuel assemblies need to be replaced and relocated within the core. Defective fuel rods in particular fuel assemblies have to be removed from further service and before delivery of such faulty fuel assemblies to a reprocessing plant. The system which Brown Boveri Reaktor GmbH and Krautkraemer have developed in the Federal Republic of Germany is capable of directly locating the defective rods in a proper fuel assembly. Inspection times are comparable to those of standard sipping methods, with the advantages of immediately available results and direct identification of the defective fuel rods. During the repair of fuel assemblies this system allows withdrawal of individual defective rods. With the sipping method all the fuel rods of a defective fuel assembly need to be removed and inspected by eddy current testing. During steam generator inspection and repair personnel are exposed to ample radiation. A remotely controlled, computerized manipulator was used to significantly reduce the radiation dose by automating steps in the procedures; at the same time inspection and repair times were reduced. The main features of the manipulator are a rigid component construction of the leg and two arms, and a resolver control for horizontal and vertical motion that enables rapid and accurate access to a desired tube (author)

  15. Standardisation of an European end-user nutrient database for nutritional epidemiology: what can we learn from the EPIC Nutrient Database (ENDB) project?

    DEFF Research Database (Denmark)

    Slimani, N.; Deharveng, G.; Unwin, I.

    2007-01-01

    the absence of a reference European nutrient database for international nutritional epidemiology studies, the EPIC Nutrient Database (ENDB) project has been set up to standardise nutrient databases (NDBs) across 10 European countries participating in the EPIC study. This paper reports the main...... problems in harmonising NDBs experienced by end-user in the ENDB project and the solutions adopted to prevent and minimize them, which are also relevant for other large European nutritional studies. Furthermore, it provides end-user recommendations for improving the comparability of European and other NDBs...

  16. Calculation of the Incremental Conditional Core Damage Probability on the Extension of Allowed Outage Time

    International Nuclear Information System (INIS)

    Kang, Dae Il; Han, Sang Hoon

    2006-01-01

    RG 1.177 requires that the conditional risk (incremental conditional core damage probability and incremental conditional large early release probability: ICCDP and ICLERP), given that a specific component is out of service (OOS), be quantified for a permanent change of the allowed outage time (AOT) of a safety system. An AOT is the length of time that a particular component or system is permitted to be OOS while the plant is operating. The ICCDP is defined as: ICCDP = [(conditional CDF with the subject equipment OOS)- (baseline CDF with nominal expected equipment unavailabilities)] [duration of the single AOT under consideration]. Any event enabling the component OOS can initiate the time clock for the limiting condition of operation for a nuclear power plant. Thus, the largest ICCDP among the ICCDPs estimated from any occurrence of the basic events for the component fault tree should be selected for determining whether the AOT can be extended or not. If the component is under a preventive maintenance, the conditional risk can be straightforwardly calculated without changing the CCF probability. The main concern is the estimations of the CCF probability because there are the possibilities of the failures of other similar components due to the same root causes. The quantifications of the risk, given that a subject equipment is in a failed state, are performed by setting the identified event of subject equipment to TRUE. The CCF probabilities are also changed according to the identified failure cause. In the previous studies, however, the ICCDP was quantified with the consideration of the possibility of a simultaneous occurrence of two CCF events. Based on the above, we derived the formulas of the CCF probabilities for the cases where a specific component is in a failed state and we presented sample calculation results of the ICCDP for the low pressure safety injection system (LPSIS) of Ulchin Unit 3

  17. Risk-based assessment of the allowable outage times for the unit 1 leningrad nuclear power plant ECCS components

    International Nuclear Information System (INIS)

    Koukhar, Sergey; Vinnikov, Bronislav

    2009-01-01

    Present paper describes a method for risk - informed assessment of the Allowable Outage Times (AOTs). The AOT is the time, when components of a safety system allowed to be out of service during power operation or during shutdown operation off a plant. If the components are not restored during the time, the plant in operation must be shut down or the plant in a given shutdown mode has to go to safer shutdown mode. Application of the method is also provided for the equipment of the Unit 1 Leningrad NPP ECCS components. For solution of the problem it is necessary to carry out two series of computations using a Living PSA model, level 1. In the first series of the computations the core damage frequency (CDFb) for the base configuration of the plant is determined (there is no equipment out of service). Here the symbol 'b' means the base configuration of a plant. In the second series of the computations the core damage frequency (CDFi) for the configuration of the plant with the component (which is out of service) is calculated. That is here CDFi is determined for the failure probability of the component equal to 1.0 (component 'i' is unavailable). Then it is necessary to determine so called Risk Increase Factor (RIF) using the following ratio: RIFi = CDFi / CDFb. At last the AOT is calculated with the help of the ratio: AOTi = Tppr / RIFi, where Tppr is a period of time between two Planned Preventive Repairs (PPRs). 1. Using the risk based approach the AOTs were calculated for a set of the components of the Unit 1 Leningrad NPP ECCS components. 2. The main conclusion from the analysis is that the current deterministic AOTs for the ECCS components are conservative and should be extended. 3. The risk based extension of the AOTs for the ECCS components can prevent the Unit 1 Leningrad NPP to enter into the operating modes with increased risk. (author)

  18. Pressure Ulcer Risk and Prevention Practices in Pediatric Patients: A Secondary Analysis of Data from the National Database of Nursing Quality Indicators®.

    Science.gov (United States)

    Razmus, Ivy; Bergquist-Beringer, Sandra

    2017-01-01

    Little is known about pressure ulcer prevention practice among pediatric patients. To describe the frequency of pressure ulcer risk assessment in pediatric patients and pressure ulcer prevention intervention use overall and by hospital unit type, a descriptive secondary analysis was performed of data submitted to the National Database for Nursing Quality Indicators® (NDNQI®) for at least 3 of the 4 quarters in 2012. Relevant data on pressure ulcer risk from 271 hospitals across the United States extracted from the NDNQI database included patient skin and pressure ulcer risk assessment on admission, time since the last pressure ulcer risk assessment, method used to assess pressure ulcer risk, and risk status. Extracted data on pressure ulcer prevention included skin assessment, pressure-redistribution surface use, routine repositioning, nutritional support, and moisture management. These data were organized by unit type and merged with data on hospital characteristics for the analysis. The sample included 39 984 patients ages 1 day to 18 years on 678 pediatric acute care units (general pediatrics, pediatric critical care units, neonatal intensive care units, pediatric step-down units, and pediatric rehabilitation units). Descriptive statistics were used to analyze study data. Most of the pediatric patients (33 644; 89.2%) were assessed for pressure ulcer risk within 24 hours of admission. The Braden Q Scale was frequently used to assess risk on general pediatrics units (75.4%), pediatric step-down units (85.5%), pediatric critical care units (81.3%), and pediatric rehabilitation units (56.1%). In the neonatal intensive care units, another scale or method was used more often (55% to 60%) to assess pressure ulcer risk. Of the 11 203 pediatric patients (39%) determined to be at risk for pressure ulcers, the majority (10 741, 95.8%) received some kind of pressure ulcer prevention intervention during the 24 hours preceding the NDNQI pressure ulcer survey. The frequency

  19. The Brainomics/Localizer database.

    Science.gov (United States)

    Papadopoulos Orfanos, Dimitri; Michel, Vincent; Schwartz, Yannick; Pinel, Philippe; Moreno, Antonio; Le Bihan, Denis; Frouin, Vincent

    2017-01-01

    The Brainomics/Localizer database exposes part of the data collected by the in-house Localizer project, which planned to acquire four types of data from volunteer research subjects: anatomical MRI scans, functional MRI data, behavioral and demographic data, and DNA sampling. Over the years, this local project has been collecting such data from hundreds of subjects. We had selected 94 of these subjects for their complete datasets, including all four types of data, as the basis for a prior publication; the Brainomics/Localizer database publishes the data associated with these 94 subjects. Since regulatory rules prevent us from making genetic data available for download, the database serves only anatomical MRI scans, functional MRI data, behavioral and demographic data. To publish this set of heterogeneous data, we use dedicated software based on the open-source CubicWeb semantic web framework. Through genericity in the data model and flexibility in the display of data (web pages, CSV, JSON, XML), CubicWeb helps us expose these complex datasets in original and efficient ways. Copyright © 2015 Elsevier Inc. All rights reserved.

  20. Precise outage analysis of mixed RF/unified-FSO DF relaying with HD and 2 IM-DD channel models

    KAUST Repository

    Al-Ebraheemy, Omer Mahmoud S.

    2017-07-20

    This paper derives and analyzes the outage probability of mixed radio frequency (RF)/unified free space optical (FSO) dual-hop decode-and-forward (DF) relaying scheme, where heterodyne detection (HD) and intensity modulation-direct detection (IM-DD) are considered for FSO detection. In doing that, we correctly utilize, for the first time to the best of our knowledge, a precise channel capacity result for the IM-DD channel. Moreover, this is the first time that not only the (IM-DD input-independent) but also the (IM-DD cost-dependent) AWGN channel is considered in such system analysis. This work assumes that the first hop (RF link) follows Naka-gami-m fading, while the second hop (FSO link) follows Málaga (M) turbulence with pointing error. These fading and turbulence models include other ones (such as Rayleigh fading and Gamma-Gamma turbulence) as special cases, so our analysis can be considered as a generalized one from both RF and FSO fading models point of view. Additionally, the system outage probability is investigated asymptotically in high signal-to-noise ratio (SNR) regime, where a new non-reported diversity order and coding gain analysis are shown. Interestingly, we find that in the FSO hop, based on SNR, the HD or IM-DD cost-dependent results in a same diversity order which is twice the one of IM-DD input-independent. However, based on transmitted power all these FSO detectors result in a same diversity order. Furthermore, we offer simulation results which confirm the derived exact and asymptotic expressions.

  1. Precise outage analysis of mixed RF/unified-FSO DF relaying with HD and 2 IM-DD channel models

    KAUST Repository

    Al-Ebraheemy, Omer Mahmoud S.; Salhab, Anas M.; Chaaban, Anas; Zummo, Salam A.; Alouini, Mohamed-Slim

    2017-01-01

    This paper derives and analyzes the outage probability of mixed radio frequency (RF)/unified free space optical (FSO) dual-hop decode-and-forward (DF) relaying scheme, where heterodyne detection (HD) and intensity modulation-direct detection (IM-DD) are considered for FSO detection. In doing that, we correctly utilize, for the first time to the best of our knowledge, a precise channel capacity result for the IM-DD channel. Moreover, this is the first time that not only the (IM-DD input-independent) but also the (IM-DD cost-dependent) AWGN channel is considered in such system analysis. This work assumes that the first hop (RF link) follows Naka-gami-m fading, while the second hop (FSO link) follows Málaga (M) turbulence with pointing error. These fading and turbulence models include other ones (such as Rayleigh fading and Gamma-Gamma turbulence) as special cases, so our analysis can be considered as a generalized one from both RF and FSO fading models point of view. Additionally, the system outage probability is investigated asymptotically in high signal-to-noise ratio (SNR) regime, where a new non-reported diversity order and coding gain analysis are shown. Interestingly, we find that in the FSO hop, based on SNR, the HD or IM-DD cost-dependent results in a same diversity order which is twice the one of IM-DD input-independent. However, based on transmitted power all these FSO detectors result in a same diversity order. Furthermore, we offer simulation results which confirm the derived exact and asymptotic expressions.

  2. Outage Performance Analysis of Cooperative Diversity with MRC and SC in Correlated Lognormal Channels

    Directory of Open Access Journals (Sweden)

    Skraparlis D

    2009-01-01

    Full Text Available Abstract The study of relaying systems has found renewed interest in the context of cooperative diversity for communication channels suffering from fading. This paper provides analytical expressions for the end-to-end SNR and outage probability of cooperative diversity in correlated lognormal channels, typically found in indoor and specific outdoor environments. The system under consideration utilizes decode-and-forward relaying and Selection Combining or Maximum Ratio Combining at the destination node. The provided expressions are used to evaluate the gains of cooperative diversity compared to noncooperation in correlated lognormal channels, taking into account the spectral and energy efficiency of the protocols and the half-duplex or full-duplex capability of the relay. Our analysis demonstrates that correlation and lognormal variances play a significant role on the performance gain of cooperative diversity against noncooperation.

  3. Outage and ser performance of spectrum sharing system with TAS/MRC

    KAUST Repository

    Khan, Fahd Ahmed

    2013-06-01

    Capacity of the secondary network degrades due to the interference constraint from the primary network. The secondary network capacity can be enhanced by means of spatial diversity, that can be achieved by adding multiple antennas on the terminals. In this paper, the performance of a multiple-input multiple-output (MIMO) secondary link with transmit antenna selection (TAS) at the transmitter and maximum ratio combining (MRC) at the receiver is analysed. A peak transmit power constraint is considered in addition to the interference power constraint. For a Rayleigh faded channel, closed-form expression for the outage probability of a MIMO cognitive system (MIMO-CS) with TAS/MRC is derived. In addition, closed-form expressions of the moment generating function and the symbol error rate are also obtained. The performance of this system is analyzed for asymptotic regimes and it is shown that TAS/MRC in a MIMO-CS achieves a generalized diversity order of nTnR, where nT and nR are the number of transmit and receive antennas, respectively. Numerical results are also presented to corroborate the derived analytical results. © 2013 IEEE.

  4. Development of the Bayesian method for unavailability inference. The new inferential theory and the examples of inference using BWR outage data in Japan

    International Nuclear Information System (INIS)

    Nakamura, Makoto

    2009-01-01

    It is important for Level 1 PSA to quantify input reliability parameters and their uncertainty. Bayesian methods for inference of system/component unavailability, however, are not well studied. At present practitioners allocate the uncertainty (i.e. error factor) of the unavailability based on engineering judgment. Systematic methods based on Bayesian statistics are needed for quantification of such uncertainty. In this study we have developed a new method for Bayesian inference of unavailability, where the posterior of system/component unavailability is described by the inverted gamma distribution. We show that the average of the posterior comes close to the point estimate of the unavailability as the number of outages goes to infinity. That indicates validity of the new method. Using plant data recorded in NUCIA, we have applied the new method to inference of system unavailability under unplanned outages due to violations of LCO at BWRs in Japan. According to the inference results, the unavailability is populated in the order of 10 -5 -10 -4 and the error factor is within 1-2. Thus, the new Bayesian method allows one to quantify magnitudes and widths (i.e. error factor) of uncertainty distributions of unavailability. (author)

  5. A study on assessment methodology of surveillance test interval and Allowed Outage Time

    Energy Technology Data Exchange (ETDEWEB)

    Che, Moo Seong; Cheong, Chang Hyeon; Ryu, Yeong Woo; Cho, Jae Seon; Heo, Chang Wook; Kim, Do Hyeong; Kim, Joo Yeol; Kim, Yun Ik; Yang, Hei Chang [Seoul National Univ., Seoul (Korea, Republic of)

    1997-07-15

    Objectives of this study is the development of methodology by which assesses the optimization of Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korean nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches are performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method. In the second year of this study, the sensitivity analyses about the failure factors of the components are performed in the bases of the assessment methodologies of the first study, the interaction modeling of the STI and AOT is quantified. And the reliability assessment methodology about the diesel generator is reviewed and applied to the PSA code.

  6. Start-up of Cirus after refurbishment outage and observations during approach to criticality

    International Nuclear Information System (INIS)

    Singh, Tej; Singh, Kanchhi; Sengupta, S.N.

    2004-10-01

    The report presents various physics related aspects of the startup of Cirus reactor after the prolonged refurbishment outage. The special nuclear instrumentation scheme adopted to ensure safe startup of the reactor is described. Salient observations made and physics measurements carried out during various approaches to criticality are covered. One of the significant observations concerned a major reactivity anomaly during the approach to criticality. After due investigations the cause of the anomaly was attributed to the inadvertent wetting of the graphite reflector which houses the reactor regulating and protection system ion chambers. The report also includes salient observations during raising of reactor power to high levels. The wet reflector also resulted in a significant difference measured between the thermal and neutronic power of the reactor. In view of the reactivity anomaly, the core reactivity variation with time was closely followed and compared with computations. As expected the reactivity anomaly reduced gradually with time. (author)

  7. A study on assessment methodology of surveillance test interval and Allowed Outage Time

    International Nuclear Information System (INIS)

    Che, Moo Seong; Cheong, Chang Hyeon; Ryu, Yeong Woo; Cho, Jae Seon; Heo, Chang Wook; Kim, Do Hyeong; Kim, Joo Yeol; Kim, Yun Ik; Yang, Hei Chang

    1997-07-01

    Objectives of this study is the development of methodology by which assesses the optimization of Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korean nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches are performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method. In the second year of this study, the sensitivity analyses about the failure factors of the components are performed in the bases of the assessment methodologies of the first study, the interaction modeling of the STI and AOT is quantified. And the reliability assessment methodology about the diesel generator is reviewed and applied to the PSA code

  8. A study on assessment methodology of surveillance test interval and allowed outage time

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Chang Hyun; You, Young Woo; Cho, Jae Seon; Huh, Chang Wook; Kim, Do Hyoung; Kim, Ju Youl; Kim, Yoon Ik; Yang, Hui Chang; Park, Kang Min [Seoul National Univ., Seoul (Korea, Republic of)

    1998-03-15

    The objectives of this study is the development of methodology by which assesses the optimization of Surveillance Test Internal(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korean nuclear power plant safety. In this study, the survey about the assessment methodologies, modelings and results performed by domestic and international researches are performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method. The sensitivity analyses about the failure factors of the components are performed in the bases of the and AOT is quantified. And the reliability assessment methodology about the diesel generator is reviewed and applied to the PSA code. The qualitative assessment for the STI/AOR of RPS/ESFAS assured safety the most important system in the nuclear power plant are performed.

  9. Database Description - Trypanosomes Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Trypanosomes Database Database Description General information of database Database name Trypanosomes Database...stitute of Genetics Research Organization of Information and Systems Yata 1111, Mishima, Shizuoka 411-8540, JAPAN E mail: Database...y Name: Trypanosoma Taxonomy ID: 5690 Taxonomy Name: Homo sapiens Taxonomy ID: 9606 Database description The... Article title: Author name(s): Journal: External Links: Original website information Database maintenance s...DB (Protein Data Bank) KEGG PATHWAY Database DrugPort Entry list Available Query search Available Web servic

  10. Dynamic preventive control of electric power systems through load shedding; Controle preventivo dinamico de sistemas de energia eletrica: formulacao atraves do corte de carga

    Energy Technology Data Exchange (ETDEWEB)

    Righeto, Luzia F.P.; Minussi, Carlos R. [UNESP, Ilha Solteira, SP (Brazil). Dept. de Engenharia Eletrica

    1997-12-31

    This work presents a model to be used in Electric Power System preventive control, taking into account the dynamic network aspects, the effects caused by great oscillations in the synchronous machines angles (transient stability), electric equipment outages, short-circuit, etc. The energy function will be used as a form of measure the system stability degree using a criterion defined as security margin. The used control action will be the load shedding. (author) 16 refs.; e-mail: minussi at dee.feis.unesp.br

  11. Database Description - SKIP Stemcell Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us SKIP Stemcell Database Database Description General information of database Database name SKIP Stemcell Database...rsity Journal Search: Contact address http://www.skip.med.keio.ac.jp/en/contact/ Database classification Human Genes and Diseases Dat...abase classification Stemcell Article Organism Taxonomy Name: Homo sapiens Taxonomy ID: 9606 Database...ks: Original website information Database maintenance site Center for Medical Genetics, School of medicine, ...lable Web services Not available URL of Web services - Need for user registration Not available About This Database Database

  12. A Unified Simulation Approach for the Fast Outage Capacity Evaluation over Generalized Fading Channels

    KAUST Repository

    Rached, Nadhir B.

    2016-01-06

    The outage capacity (OC) is among the most important performance metrics of communication systems over fading channels. The evaluation of the OC, when equal gain combining (EGC) or maximum ratio combining (MRC) diversity techniques are employed, boils down to computing the cumulative distribution function (CDF) of the sum of channel envelopes (equivalently amplitudes) for EGC or channel gains (equivalently squared enveloped/ amplitudes) for MRC. Closed-form expressions of the CDF of the sum of many generalized fading variates are generally unknown and constitute open problems. We develop a unified hazard rate twisting Importance Sampling (IS) based approach to efficiently estimate the CDF of the sum of independent arbitrary variates. The proposed IS estimator is shown to achieve an asymptotic optimality criterion, which clearly guarantees its efficiency. Some selected simulation results are also shown to illustrate the substantial computational gain achieved by the proposed IS scheme over crude Monte Carlo simulations.

  13. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  14. Database Description - Arabidopsis Phenome Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Arabidopsis Phenome Database Database Description General information of database Database n... BioResource Center Hiroshi Masuya Database classification Plant databases - Arabidopsis thaliana Organism T...axonomy Name: Arabidopsis thaliana Taxonomy ID: 3702 Database description The Arabidopsis thaliana phenome i...heir effective application. We developed the new Arabidopsis Phenome Database integrating two novel database...seful materials for their experimental research. The other, the “Database of Curated Plant Phenome” focusing

  15. The Danish Fetal Medicine Database

    Directory of Open Access Journals (Sweden)

    Ekelund CK

    2016-10-01

    Full Text Available Charlotte Kvist Ekelund,1 Tine Iskov Kopp,2 Ann Tabor,1 Olav Bjørn Petersen3 1Department of Obstetrics, Center of Fetal Medicine, Rigshospitalet, University of Copenhagen, Copenhagen, Denmark; 2Registry Support Centre (East – Epidemiology and Biostatistics, Research Centre for Prevention and Health, Glostrup, Denmark; 3Fetal Medicine Unit, Aarhus University Hospital, Aarhus Nord, Denmark Aim: The aim of this study is to set up a database in order to monitor the detection rates and false-positive rates of first-trimester screening for chromosomal abnormalities and prenatal detection rates of fetal malformations in Denmark. Study population: Pregnant women with a first or second trimester ultrasound scan performed at all public hospitals in Denmark are registered in the database. Main variables/descriptive data: Data on maternal characteristics, ultrasonic, and biochemical variables are continuously sent from the fetal medicine units' Astraia databases to the central database via web service. Information about outcome of pregnancy (miscarriage, termination, live birth, or stillbirth is received from the National Patient Register and National Birth Register and linked via the Danish unique personal registration number. Furthermore, results of all pre- and postnatal chromosome analyses are sent to the database. Conclusion: It has been possible to establish a fetal medicine database, which monitors first-trimester screening for chromosomal abnormalities and second-trimester screening for major fetal malformations with the input from already collected data. The database is valuable to assess the performance at a regional level and to compare Danish performance with international results at a national level. Keywords: prenatal screening, nuchal translucency, fetal malformations, chromosomal abnormalities

  16. Open Geoscience Database

    Science.gov (United States)

    Bashev, A.

    2012-04-01

    Currently there is an enormous amount of various geoscience databases. Unfortunately the only users of the majority of the databases are their elaborators. There are several reasons for that: incompaitability, specificity of tasks and objects and so on. However the main obstacles for wide usage of geoscience databases are complexity for elaborators and complication for users. The complexity of architecture leads to high costs that block the public access. The complication prevents users from understanding when and how to use the database. Only databases, associated with GoogleMaps don't have these drawbacks, but they could be hardly named "geoscience" Nevertheless, open and simple geoscience database is necessary at least for educational purposes (see our abstract for ESSI20/EOS12). We developed a database and web interface to work with them and now it is accessible at maps.sch192.ru. In this database a result is a value of a parameter (no matter which) in a station with a certain position, associated with metadata: the date when the result was obtained; the type of a station (lake, soil etc); the contributor that sent the result. Each contributor has its own profile, that allows to estimate the reliability of the data. The results can be represented on GoogleMaps space image as a point in a certain position, coloured according to the value of the parameter. There are default colour scales and each registered user can create the own scale. The results can be also extracted in *.csv file. For both types of representation one could select the data by date, object type, parameter type, area and contributor. The data are uploaded in *.csv format: Name of the station; Lattitude(dd.dddddd); Longitude(ddd.dddddd); Station type; Parameter type; Parameter value; Date(yyyy-mm-dd). The contributor is recognised while entering. This is the minimal set of features that is required to connect a value of a parameter with a position and see the results. All the complicated data

  17. Carbon Monoxide (CO) Poisoning Prevention

    Science.gov (United States)

    ... family by acting wisely in case of a power outage and learning the symptoms of CO poisoning. How to Recognize CO Poisoning The most common symptoms of CO poisoning are headache, dizziness, weakness, nausea, vomiting, chest pain, and confusion. People who are sleeping or who ...

  18. Human Factors and Modeling Methods in the Development of Control Room Modernization Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Hugo, Jacques V.; Slay III, Lorenzo

    2017-06-01

    nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical tool currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While these tools are useful, there is still considerable uncertainty during a typical outage that bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy’s Advanced Outage Control Center project. This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance

  19. Intermediate report of MoReMo. Modelling resilience for maintenance and outage

    Energy Technology Data Exchange (ETDEWEB)

    Oedewald, P.; Macchi, L. (VTT Technical Research Centre of Finland (Finland)); Axelsson, C. (Ringhals AB, Vattenfall AB (Sweden)); Eitrheim, M.H.R. (Institute for Energy Technology (Norway))

    2012-02-15

    Resilience Engineering (RE) is a new approach to safety that helps organisations and individuals adapt to unforeseen events and long-term changes. Such an approach is needed by nuclear power plants (NPPs) as they face demanding modification projects, high staff turnover and increased pressures to maintain and improve safety. The goal of the Modelling Resilience for Maintenance and Outage (MoReMO) project is to develop and test models and methods to identify and analyse resilience in safety-critical activities in natural everyday settings. In 2011, we have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. The project has collected data through observations, interviews and document reviews at two NPPs. Together, the four approaches have provided valuable insights for understanding the rationale behind work practices, their effects on safety, and the support of flexibility and adaptability. In 2012, the MoReMO project will complete the data collection and integrate results on how resilience can be operationalized in practical safety management tools for the companies. (Author)

  20. Risk-based evaluation of Allowed Outage Times (AOTs) considering risk of shutdown

    International Nuclear Information System (INIS)

    Mankamo, T.; Kim, I.S.; Samanta, P.K.

    1992-01-01

    When safety systems fail during power operation, Technical Specifications (TS) usually limit the repair within Allowed Outage Time (AOT). If the repair cannot be completed within the AOT, or no AOT is allowed, the plant is required to be shut down for the repair. However, if the capability to remove decay heat is degraded, shutting down the plant with the need to operate the affected decay-heat removal systems may impose a substantial risk compared to continued power operation over a usual repair time. Thus, defining a proper AOT in such situations can be considered as a risk-comparison between the repair in frill power state with a temporarily increased level of risk, and the altemative of shutting down the plant for the repair in zero power state with a specific associated risk. The methodology of the risk-comparison approach, with a due consideration of the shutdown risk, has been further developed and applied to the AOT considerations of residual heat removal and standby service water systems of a boiling water reactor (BWR) plant. Based on the completed work, several improvements to the TS requirements for the systems studied can be suggested

  1. Intermediate report of MoReMo. Modelling resilience for maintenance and outage

    International Nuclear Information System (INIS)

    Oedewald, P.; Macchi, L.; Axelsson, C.; Eitrheim, M.H.R.

    2012-02-01

    Resilience Engineering (RE) is a new approach to safety that helps organisations and individuals adapt to unforeseen events and long-term changes. Such an approach is needed by nuclear power plants (NPPs) as they face demanding modification projects, high staff turnover and increased pressures to maintain and improve safety. The goal of the Modelling Resilience for Maintenance and Outage (MoReMO) project is to develop and test models and methods to identify and analyse resilience in safety-critical activities in natural everyday settings. In 2011, we have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. The project has collected data through observations, interviews and document reviews at two NPPs. Together, the four approaches have provided valuable insights for understanding the rationale behind work practices, their effects on safety, and the support of flexibility and adaptability. In 2012, the MoReMO project will complete the data collection and integrate results on how resilience can be operationalized in practical safety management tools for the companies. (Author)

  2. Experience of oil in CANDU moderator during A831 planned outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, G.; Nashiem, R.; Matheson, S.; Stuart, C.; Roberts, J.G.

    2011-01-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  3. Experience of oil in CANDU® moderator during A831 planned outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, G.; Nashiem, R.; Matheson, S.; Stuart, C.; Roberts, J.G.

    2010-01-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU® reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  4. Experience of oil in CANDU® moderator during A831 planned outage at Bruce Power

    Energy Technology Data Exchange (ETDEWEB)

    Ma, G.; Nashiem, R.; Matheson, S. [Bruce Power, Tiverton, Ontario (Canada); Stuart, C. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Roberts, J.G. [CANTECH Associates Ltd., Burlington, Ontario (Canada)

    2010-07-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU® reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  5. Experience of oil in CANDU moderator during A831 planned outage at Bruce Power

    Energy Technology Data Exchange (ETDEWEB)

    Ma, G.; Nashiem, R.; Matheson, S. [Bruce Power, Tiverton, Ontario (Canada); Stuart, C. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Roberts, J.G. [CANTECH Associates Ltd., Burlington, Ontario (Canada)

    2011-03-15

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  6. A unified simulation approach for the fast outage capacity evaluation over generalized fading channels

    KAUST Repository

    Rached, Nadhir B.

    2015-06-14

    The outage capacity (OC) is among the most important performance metrics of communication systems over fading channels. The evaluation of the OC, when Equal Gain Combining (EGC) or Maximum Ratio Combining (MRC) diversity techniques are employed, boils down to computing the Cumulative Distribution Function (CDF) of the sum of channel envelopes (equivalently amplitudes) for EGC or channel gain (equivalently squared enveloped/amplitudes) for MRC. Closed-form expressions of the CDF of the sum of many generalized fading variates are generally unknown and constitute open problems. In this paper, we develop a unified hazard rate twisting Importance Sampling (IS) based approach to efficiently estimate the CDF of the sum of independent arbitrary variates. The proposed IS estimator is shown to achieve an asymptotic optimality criterion, which clearly guarantees its efficiency. Some selected simulation results are also shown to illustrate the substantial computational gain achieved by the proposed IS scheme over crude Monte-Carlo simulations.

  7. Loss of benefits resulting from nuclear-power-plant outages. Volume 1. Approach and analysis

    International Nuclear Information System (INIS)

    Buehring, W.A.; Peerenboom, J.P.

    1982-03-01

    This report discusses and analyzes some of the important consequences of nuclear-power-plant unavailability, and quantifies a number of technical measures of loss of benefits that may help the Nuclear Regulatory Commission make decisions involving nuclear-power-plant licensing and operation. The consequences include increased costs of system generation, increased demand for nonnuclear and often scarce fuels, and reduced system reliability. Argonne National Laboratory (ANL) developed case studies to investigate the effects of hypothetical nuclear-plant shutdowns. The studies developed quantitative measures of both short- and long-term economic, fuel use, and reliability effects that could result from the unavailability of nuclear generating units. Results showed that production costs (fuel costs plus operation and maintenance costs) increase significantly whenever an operating reactor is shut down. Production-cost increases ranged from less than 10% to over 60%; the normalized increases for the first year of reactor outage ranged from $0.125 million per MWe-year to $0.33 million per MWe-year

  8. Investigation report from the commission for energy regulation about the outage of Saturday November 4, 2006

    International Nuclear Information System (INIS)

    2007-01-01

    On November 4, 2006, a large-scale incident occurred on the European high-voltage interconnected power network which left 15 million people without electricity in Western Europe during about 2 hours. Considering the European dimension of the outage, the European Regulators Group for Electricity and Gas (ERGEG) conducted an investigation, the final report of which being made publically available on February 6, 2007. Considering the impact of this incident on the French territory, the French commission for energy regulation (CRE) decided as soon as November 5, 2006 to carry out its own investigation in order to inform the French consumers about the chronology of facts and the precise causes of this incident. This document summarises the CRE's report and presents its conclusions and recommendations as well as the technical report of the incident

  9. Database Description - Yeast Interacting Proteins Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Yeast Interacting Proteins Database Database Description General information of database Database... name Yeast Interacting Proteins Database Alternative name - DOI 10.18908/lsdba.nbdc00742-000 Creator C...-ken 277-8561 Tel: +81-4-7136-3989 FAX: +81-4-7136-3979 E-mail : Database classif...s cerevisiae Taxonomy ID: 4932 Database description Information on interactions and related information obta...l Acad Sci U S A. 2001 Apr 10;98(8):4569-74. Epub 2001 Mar 13. External Links: Original website information Database

  10. Reliability parameters of distribution networks components

    Energy Technology Data Exchange (ETDEWEB)

    Gono, R.; Kratky, M.; Rusek, S.; Kral, V. [Technical Univ. of Ostrava (Czech Republic)

    2009-03-11

    This paper presented a framework for the retrieval of parameters from various heterogenous power system databases. The framework was designed to transform the heterogenous outage data in a common relational scheme. The framework was used to retrieve outage data parameters from the Czech and Slovak republics in order to demonstrate the scalability of the framework. A reliability computation of the system was computed in 2 phases representing the retrieval of component reliability parameters and the reliability computation. Reliability rates were determined using component reliability and global reliability indices. Input data for the reliability was retrieved from data on equipment operating under similar conditions, while the probability of failure-free operations was evaluated by determining component status. Anomalies in distribution outage data were described as scheme, attribute, and term differences. Input types consisted of input relations; transformation programs; codebooks; and translation tables. The system was used to successfully retrieve data from 7 distributors in the Czech Republic and Slovak Republic between 2000-2007. The database included 301,555 records. Data were queried using SQL language. 29 refs., 2 tabs., 2 figs.

  11. Update History of This Database - Trypanosomes Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Trypanosomes Database Update History of This Database Date Update contents 2014/05/07 The co...ntact information is corrected. The features and manner of utilization of the database are corrected. 2014/02/04 Trypanosomes Databas...e English archive site is opened. 2011/04/04 Trypanosomes Database ( http://www.tan...paku.org/tdb/ ) is opened. About This Database Database Description Download Lice...nse Update History of This Database Site Policy | Contact Us Update History of This Database - Trypanosomes Database | LSDB Archive ...

  12. Evaluation of mean time between forced outage for reactor protection system using RBD and failure rate

    International Nuclear Information System (INIS)

    Lee, D. Y.; Park, J. H.; Hwang, I. K.; Cha, K. H.; Choi, J. K.; Lee, K. Y.; Park, J. K.

    2001-01-01

    The design life of nuclear power plants (NPPs) under recent construction is about fifty to sixty years. However, the duration that equipments of control systems operate without failures is at most five to ten years. Design for diversity and adequate maintenance strategy are required for NPP protection system in order to use the control equipment which has shorter life time than the design life of NPP. Fault Tree Analysis (FTA) technique, which has been applied to Probabilistics Safety Analysis (PSA), has been introduced to quantitatively evaluate the reliability of NPP I and C systems. The FTA, however, cannot properly consider the effect of maintenance. In this work, we have reviewed quantitative reliability evaluation techniques using the reliability block diagram and failure rates and applied it to the evaluation of mean time between forced outage for reactor protection system

  13. An Autonomic Framework for Integrating Security and Quality of Service Support in Databases

    Science.gov (United States)

    Alomari, Firas

    2013-01-01

    The back-end databases of multi-tiered applications are a major data security concern for enterprises. The abundance of these systems and the emergence of new and different threats require multiple and overlapping security mechanisms. Therefore, providing multiple and diverse database intrusion detection and prevention systems (IDPS) is a critical…

  14. An Analysis of Database Replication Technologies with Regard to Deep Space Network Application Requirements

    Science.gov (United States)

    Connell, Andrea M.

    2011-01-01

    The Deep Space Network (DSN) has three communication facilities which handle telemetry, commands, and other data relating to spacecraft missions. The network requires these three sites to share data with each other and with the Jet Propulsion Laboratory for processing and distribution. Many database management systems have replication capabilities built in, which means that data updates made at one location will be automatically propagated to other locations. This project examines multiple replication solutions, looking for stability, automation, flexibility, performance, and cost. After comparing these features, Oracle Streams is chosen for closer analysis. Two Streams environments are configured - one with a Master/Slave architecture, in which a single server is the source for all data updates, and the second with a Multi-Master architecture, in which updates originating from any of the servers will be propagated to all of the others. These environments are tested for data type support, conflict resolution, performance, changes to the data structure, and behavior during and after network or server outages. Through this experimentation, it is determined which requirements of the DSN can be met by Oracle Streams and which cannot.

  15. The power outage of November 4, 2006: a plea for a genuine European energy policy

    International Nuclear Information System (INIS)

    Merlin, Andre

    2006-01-01

    As a power outage affected several millions European people in November 2006, this article identifies and discusses actions to be implemented at the European level to avoid such a situation and thus strengthen energy security for all European citizen. It proposes a detailed analysis of the situation of electricity transport grids before the incident, of what happened in terms of overloads for some very high voltage lines: the de-energizing of a line over the Ems River resulted in a domino triggering off of very high voltage lines connected to different areas of Europe; a decrease of current frequency resulted in the disconnection of power plants and grid managers had to reduce consumption in emergency. The article draws some early lessons of the incident before the UCTE (Power Transport Coordination Union) inquiry, and recommends some actions regarding grid coordination, harmonisation of abilities and decisions, and performance of provisional assessments of the electricity supply/demand balance

  16. Outage Probability Minimization for Energy Harvesting Cognitive Radio Sensor Networks

    Directory of Open Access Journals (Sweden)

    Fan Zhang

    2017-01-01

    Full Text Available The incorporation of cognitive radio (CR capability in wireless sensor networks yields a promising network paradigm known as CR sensor networks (CRSNs, which is able to provide spectrum efficient data communication. However, due to the high energy consumption results from spectrum sensing, as well as subsequent data transmission, the energy supply for the conventional sensor nodes powered by batteries is regarded as a severe bottleneck for sustainable operation. The energy harvesting technique, which gathers energy from the ambient environment, is regarded as a promising solution to perpetually power-up energy-limited devices with a continual source of energy. Therefore, applying the energy harvesting (EH technique in CRSNs is able to facilitate the self-sustainability of the energy-limited sensors. The primary concern of this study is to design sensing-transmission policies to minimize the long-term outage probability of EH-powered CR sensor nodes. We formulate this problem as an infinite-horizon discounted Markov decision process and propose an ϵ-optimal sensing-transmission (ST policy through using the value iteration algorithm. ϵ is the error bound between the ST policy and the optimal policy, which can be pre-defined according to the actual need. Moreover, for a special case that the signal-to-noise (SNR power ratio is sufficiently high, we present an efficient transmission (ET policy and prove that the ET policy achieves the same performance with the ST policy. Finally, extensive simulations are conducted to evaluate the performance of the proposed policies and the impaction of various network parameters.

  17. Plant Outage Time Savings Provided by Subcritical Physics Testing at Vogtle Unit 2

    International Nuclear Information System (INIS)

    Cupp, Philip; Heibel, M.D.

    2006-01-01

    The most recent core reload design verification physics testing done at Southern Nuclear Company's (SNC) Vogtle Unit 2, performed prior to initial power operations in operating cycle 12, was successfully completed while the reactor was at least 1% ΔK/K subcritical. The testing program used was the first application of the Subcritical Physics Testing (SPT) program developed by the Westinghouse Electric Company LLC. The SPT program centers on the application of the Westinghouse Subcritical Rod Worth Measurement (SRWM) methodology that was developed in cooperation with the Vogtle Reactor Engineering staff. The SRWM methodology received U. S. Nuclear Regulatory Commission (NRC) approval in August of 2005. The first application of the SPT program occurred at Vogtle Unit 2 in October of 2005. The results of the core design verification measurements obtained during the SPT program demonstrated excellent agreement with prediction, demonstrating that the predicted core characteristics were in excellent agreement with the actual operating characteristics of the core. This paper presents an overview of the SPT Program used at Vogtle Unit 2 during operating cycle 12, and a discussion of the critical path outage time savings the SPT program is capable of providing. (authors)

  18. Update History of This Database - Arabidopsis Phenome Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Arabidopsis Phenome Database Update History of This Database Date Update contents 2017/02/27 Arabidopsis Phenome Data...base English archive site is opened. - Arabidopsis Phenome Database (http://jphenom...e.info/?page_id=95) is opened. About This Database Database Description Download License Update History of This Database... Site Policy | Contact Us Update History of This Database - Arabidopsis Phenome Database | LSDB Archive ...

  19. Lightning-generated whistler waves observed by probes on the Communication/Navigation Outage Forecast System satellite at low latitudes

    Science.gov (United States)

    Holzworth, R. H.; McCarthy, M. P.; Pfaff, R. F.; Jacobson, A. R.; Willcockson, W. L.; Rowland, D. E.

    2011-06-01

    Direct evidence is presented for a causal relationship between lightning and strong electric field transients inside equatorial ionospheric density depletions. In fact, these whistler mode plasma waves may be the dominant electric field signal within such depletions. Optical lightning data from the Communication/Navigation Outage Forecast System (C/NOFS) satellite and global lightning location information from the World Wide Lightning Location Network are presented as independent verification that these electric field transients are caused by lightning. The electric field instrument on C/NOFS routinely measures lightning-related electric field wave packets or sferics, associated with simultaneous measurements of optical flashes at all altitudes encountered by the satellite (401-867 km). Lightning-generated whistler waves have abundant access to the topside ionosphere, even close to the magnetic equator.

  20. Refactoring databases evolutionary database design

    CERN Document Server

    Ambler, Scott W

    2006-01-01

    Refactoring has proven its value in a wide range of development projects–helping software professionals improve system designs, maintainability, extensibility, and performance. Now, for the first time, leading agile methodologist Scott Ambler and renowned consultant Pramodkumar Sadalage introduce powerful refactoring techniques specifically designed for database systems. Ambler and Sadalage demonstrate how small changes to table structures, data, stored procedures, and triggers can significantly enhance virtually any database design–without changing semantics. You’ll learn how to evolve database schemas in step with source code–and become far more effective in projects relying on iterative, agile methodologies. This comprehensive guide and reference helps you overcome the practical obstacles to refactoring real-world databases by covering every fundamental concept underlying database refactoring. Using start-to-finish examples, the authors walk you through refactoring simple standalone databas...

  1. Update History of This Database - SKIP Stemcell Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us SKIP Stemcell Database Update History of This Database Date Update contents 2017/03/13 SKIP Stemcell Database... English archive site is opened. 2013/03/29 SKIP Stemcell Database ( https://www.skip.med.k...eio.ac.jp/SKIPSearch/top?lang=en ) is opened. About This Database Database Description Download License Update History of This Databa...se Site Policy | Contact Us Update History of This Database - SKIP Stemcell Database | LSDB Archive ...

  2. Integrating heterogeneous databases in clustered medic care environments using object-oriented technology

    Science.gov (United States)

    Thakore, Arun K.; Sauer, Frank

    1994-05-01

    The organization of modern medical care environments into disease-related clusters, such as a cancer center, a diabetes clinic, etc., has the side-effect of introducing multiple heterogeneous databases, often containing similar information, within the same organization. This heterogeneity fosters incompatibility and prevents the effective sharing of data amongst applications at different sites. Although integration of heterogeneous databases is now feasible, in the medical arena this is often an ad hoc process, not founded on proven database technology or formal methods. In this paper we illustrate the use of a high-level object- oriented semantic association method to model information found in different databases into an integrated conceptual global model that integrates the databases. We provide examples from the medical domain to illustrate an integration approach resulting in a consistent global view, without attacking the autonomy of the underlying databases.

  3. Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems

    International Nuclear Information System (INIS)

    Geetha, T.; Swarup, K. Shanti

    2009-01-01

    Preventive maintenance of generating units and lines, in a competitive electric energy environment is proposed. Inclusion of transmission constraints and forced outage rates, over a specified operational period is considered. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period, for which Bender's decomposition technique is used. The objective of the GENCO is to maximize profit or to minimize loss in profit, for which transmission constrained price based unit commitment (TCPBUC), based on Lagrangian relaxation method is used. Bender's decomposition technique is used for line maintenance, with adequate level of reliability. A coordinating technique using penalty factors is incorporated to obtain convergence of the conflicting objectives. The transmission constraints are modeled using dc sensitivity factors. Detailed case studies of six-bus systems and IEEE RTS system are presented and discussed. (author)

  4. Database design and database administration for a kindergarten

    OpenAIRE

    Vítek, Daniel

    2009-01-01

    The bachelor thesis deals with creation of database design for a standard kindergarten, installation of the designed database into the database system Oracle Database 10g Express Edition and demonstration of the administration tasks in this database system. The verification of the database was proved by a developed access application.

  5. Database Description - Open TG-GATEs Pathological Image Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Open TG-GATEs Pathological Image Database Database Description General information of database Database... name Open TG-GATEs Pathological Image Database Alternative name - DOI 10.18908/lsdba.nbdc00954-0...iomedical Innovation 7-6-8, Saito-asagi, Ibaraki-city, Osaka 567-0085, Japan TEL:81-72-641-9826 Email: Database... classification Toxicogenomics Database Organism Taxonomy Name: Rattus norvegi... Article title: Author name(s): Journal: External Links: Original website information Database

  6. Inter-Rater Agreement of Pressure Ulcer Risk and Prevention Measures in the National Database of Nursing Quality Indicators(®) (NDNQI).

    Science.gov (United States)

    Waugh, Shirley Moore; Bergquist-Beringer, Sandra

    2016-06-01

    In this descriptive multi-site study, we examined inter-rater agreement on 11 National Database of Nursing Quality Indicators(®) (NDNQI(®) ) pressure ulcer (PrU) risk and prevention measures. One hundred twenty raters at 36 hospitals captured data from 1,637 patient records. At each hospital, agreement between the most experienced rater and each other team rater was calculated for each measure. In the ratings studied, 528 patients were rated as "at risk" for PrU and, therefore, were included in calculations of agreement for the prevention measures. Prevalence-adjusted kappa (PAK) was used to interpret inter-rater agreement because prevalence of single responses was high. The PAK values for eight measures indicated "substantial" to "near perfect" agreement between most experienced and other team raters: Skin assessment on admission (.977, 95% CI [.966-.989]), PrU risk assessment on admission (.978, 95% CI [.964-.993]), Time since last risk assessment (.790, 95% CI [.729-.852]), Risk assessment method (.997, 95% CI [.991-1.0]), Risk status (.877, 95% CI [.838-.917]), Any prevention (.856, 95% CI [.76-.943]), Skin assessment (.956, 95% CI [.904-1.0]), and Pressure-redistribution surface use (.839, 95% CI [.763-.916]). For three intervention measures, PAK values fell below the recommended value of ≥.610: Routine repositioning (.577, 95% CI [.494-.661]), Nutritional support (.500, 95% CI [.418-.581]), and Moisture management (.556, 95% CI [.469-.643]). Areas of disagreement were identified. Findings provide support for the reliability of 8 of the 11 measures. Further clarification of data collection procedures is needed to improve reliability for the less reliable measures. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  7. Proposed Plan for the R-Area Bingham Pump Outage Pits (643-8G, -9G, -10G) and R-Area Unknown Pits No.1, No.2, No.3 (RUNK-1, -2, -3); FINAL

    International Nuclear Information System (INIS)

    Mundy, S.

    2002-01-01

    The purpose of this proposed plan is to describe the preferred remedial alternative for the R-Area Bingham Pump Outage Pits (R BPOPs) and the R-Area Unknowns (RUNKs) operable unit (OU) and to provide for public involvement in the decision-making process

  8. Update History of This Database - Yeast Interacting Proteins Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Yeast Interacting Proteins Database Update History of This Database Date Update contents 201...0/03/29 Yeast Interacting Proteins Database English archive site is opened. 2000/12/4 Yeast Interacting Proteins Database...( http://itolab.cb.k.u-tokyo.ac.jp/Y2H/ ) is released. About This Database Database Description... Download License Update History of This Database Site Policy | Contact Us Update History of This Database... - Yeast Interacting Proteins Database | LSDB Archive ...

  9. Evaluation of allowed outage times (AOTS) from a risk and reliability standpoint

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1989-08-01

    This report describes the basic risks associated with allowed outage times (AOTS), defines strategies for selecting the risks to be quantified, and describes how the risks can be quantified. This report provides a basis for risk-based approaches for regulatory and plant implementation. The AOT risk evaluations can be applied to proposed one-time AOT changes, or to permanent changes. The evaluations can also be used to quantify risks associated with present AOTs, and in establishing AOTs from a risk perspective. The report shows that the standard way of calculating AOT risks in probabilistic risk analyses (PRAs) generally is not sufficient when evaluating all the risks associated with an AOT in order to assess its acceptability. The PRA calculates an average AOT risk which includes the frequency at which the AOT is expected to occur. Other risks associated with an AOT include the single downtime risk, which is the risk incurred when (given) the AOT has occurred. The single downtime risk is generally the most applicable risk in determining the acceptability of the AOT. The single downtime risks are generally much larger than the PRA-averaged risk. For more comprehensive evaluations, both risks should be calculated. The report also describes other risks which can be considered, including personnel and economic risks. Finally, the report discusses the detailed evaluations which are involved in calculating AOT risks, including considerations of uncertainty. (author)

  10. Database Description - RMOS | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name RMOS Alternative nam...arch Unit Shoshi Kikuchi E-mail : Database classification Plant databases - Rice Microarray Data and other Gene Expression Database...s Organism Taxonomy Name: Oryza sativa Taxonomy ID: 4530 Database description The Ric...19&lang=en Whole data download - Referenced database Rice Expression Database (RED) Rice full-length cDNA Database... (KOME) Rice Genome Integrated Map Database (INE) Rice Mutant Panel Database (Tos17) Rice Genome Annotation Database

  11. Scanning an individual monitoring database for multiple occurrences using bi-gram analysis

    International Nuclear Information System (INIS)

    Van Dijk, J. W. E.

    2007-01-01

    Maintaining the integrity of the databases is one of the important aspects of quality assurance at individual monitoring services and national dose registers. This paper presents a method for finding and preventing the occurrence of duplicate entries in the databases that can occur, e.g. because of a variable spelling or misspelling of the name. The method is based on bi-gram text analysis techniques. The methods can also be used for retrieving dose data in historical databases in the framework of dose reconstruction efforts of persons of whom the spelling of the name as originally entered, possibly decades ago, is uncertain. (authors)

  12. KALIMER database development (database configuration and design methodology)

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Kwon, Young Min; Lee, Young Bum; Chang, Won Pyo; Hahn, Do Hee

    2001-10-01

    KALIMER Database is an advanced database to utilize the integration management for Liquid Metal Reactor Design Technology Development using Web Applicatins. KALIMER Design database consists of Results Database, Inter-Office Communication (IOC), and 3D CAD database, Team Cooperation system, and Reserved Documents, Results Database is a research results database during phase II for Liquid Metal Reactor Design Technology Develpment of mid-term and long-term nuclear R and D. IOC is a linkage control system inter sub project to share and integrate the research results for KALIMER. 3D CAD Database is s schematic design overview for KALIMER. Team Cooperation System is to inform team member of research cooperation and meetings. Finally, KALIMER Reserved Documents is developed to manage collected data and several documents since project accomplishment. This report describes the features of Hardware and Software and the Database Design Methodology for KALIMER

  13. ZAGRADA - A New Radiocarbon Database

    International Nuclear Information System (INIS)

    Portner, A.; Obelic, B.; Krajcar Bornic, I.

    2008-01-01

    In the Radiocarbon and Tritium Laboratory at the Rudjer Boskovic Institute three different techniques for 14C dating have been used: Gas Proportional Counting (GPC), Liquid Scintillation Counting (LSC) and preparation of milligram-sized samples for AMS dating (Accelerator Mass Spectrometry). The use of several measurement techniques has initiated a need for development of a new relational database ZAGRADA (Zagreb Radiocarbon Database) since the existing software package CARBO could not satisfy the requirements for parallel processing/using of several techniques. Using the SQL procedures, and constraints defined by primary and foreign keys, ZAGRADA enforces high data integrity and provides better performances in data filtering and sorting. Additionally, the new database for 14C samples is a multi-user oriented application that can be accessed from remote computers in the work group providing thus better efficiency of laboratory activities. In order to facilitate data handling and processing in ZAGRADA, the graphical user interface is designed to be user-friendly and to perform various actions on data like input, corrections, searching, sorting and output to printer. All invalid actions performed in user interface are registered with short textual description of an error occurred and appearing on screen in message boxes. Unauthorized access is also prevented by login control and each application window has implemented support to track last changes made by the user. The implementation of a new database for 14C samples has significant contribution to scientific research performed in the Radiocarbon and Tritium Laboratory and will provide better and easier communication with customers.(author)

  14. On the Efficient Simulation of Outage Probability in a Log-normal Fading Environment

    KAUST Repository

    Rached, Nadhir B.

    2017-02-15

    The outage probability (OP) of the signal-to-interference-plus-noise ratio (SINR) is an important metric that is used to evaluate the performance of wireless systems. One difficulty toward assessing the OP is that, in realistic scenarios, closed-form expressions cannot be derived. This is for instance the case of the Log-normal environment, in which evaluating the OP of the SINR amounts to computing the probability that a sum of correlated Log-normal variates exceeds a given threshold. Since such a probability does not admit a closed-form expression, it has thus far been evaluated by several approximation techniques, the accuracies of which are not guaranteed in the region of small OPs. For these regions, simulation techniques based on variance reduction algorithms is a good alternative, being quick and highly accurate for estimating rare event probabilities. This constitutes the major motivation behind our work. More specifically, we propose a generalized hybrid importance sampling scheme, based on a combination of a mean shifting and a covariance matrix scaling, to evaluate the OP of the SINR in a Log-normal environment. We further our analysis by providing a detailed study of two particular cases. Finally, the performance of these techniques is performed both theoretically and through various simulation results.

  15. On the Efficient Simulation of Outage Probability in a Log-normal Fading Environment

    KAUST Repository

    Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2017-01-01

    The outage probability (OP) of the signal-to-interference-plus-noise ratio (SINR) is an important metric that is used to evaluate the performance of wireless systems. One difficulty toward assessing the OP is that, in realistic scenarios, closed-form expressions cannot be derived. This is for instance the case of the Log-normal environment, in which evaluating the OP of the SINR amounts to computing the probability that a sum of correlated Log-normal variates exceeds a given threshold. Since such a probability does not admit a closed-form expression, it has thus far been evaluated by several approximation techniques, the accuracies of which are not guaranteed in the region of small OPs. For these regions, simulation techniques based on variance reduction algorithms is a good alternative, being quick and highly accurate for estimating rare event probabilities. This constitutes the major motivation behind our work. More specifically, we propose a generalized hybrid importance sampling scheme, based on a combination of a mean shifting and a covariance matrix scaling, to evaluate the OP of the SINR in a Log-normal environment. We further our analysis by providing a detailed study of two particular cases. Finally, the performance of these techniques is performed both theoretically and through various simulation results.

  16. EPA Definition of Pollution Prevention

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. Gentilly 2 steam generators Spring 2000 outage: tubesheet waterlance cleaning and inspection; upper bundle inspection

    International Nuclear Information System (INIS)

    Akeroyd, J.K.; Plante, S.

    2000-01-01

    A review of the secondary side maintenance activities recently completed during the Gentilly 2 Annual Spring 2000 Maintenance Outage. Activities included: 1) Tubesheet intertube waterlance cleaning and visual inspection, 2) First tube support plate, in-bundle visual inspection of the hot leg, and 3) Upper bundle tube support plate visual inspection. A description of the waterlancing and inspection equipment and setup in the RB at Gentilly 2 is provided. Several innovative techniques were successfully employed and yielded savings in critical path duration, labour and personnel radiation dose. These included accessing the SG tubesheet region through one handhole only and sludge removal utilizing the SG blowdown system. Plant personnel judged tubesheet sludge removal successful. Before and after results of the cleaning process along with samples of the visual inspection results are provided. Inspection of the first support plate, which was a repeat of an inspection done in 1997, was conducted along with an in-bundle inspection of the upper tube supports. Results are presented along with a discussion of the implications for future steam generator maintenance. (author)

  18. Improving Surveillance of the Impact of Influenza and Its Prevention in Canada

    Directory of Open Access Journals (Sweden)

    David S Fedson

    1993-01-01

    Full Text Available The organization of Canada’s provincial health care systems and the administrative databases that sustain them provide physicians, epidemiologists and public health officials with unique opportunities to improve surveillance of influenza and its prevention. These databases can be used to measure the impact of influenza on excess mortality, hospitalization and costs to the health care system. They can also be used to study the epidemiology of influenza vaccination practices. Studies using the administrative database for the province of Manitoba have established the epidemiological rationale for hospital-based vaccination and have evaluated the clinical effectiveness of influenza vaccination. As pneumococcal vaccination becomes widespread in Canada, provincial databases should also prove useful in assessing the impact of the pneumococcal infections and their prevention with pneumococcal vaccine.

  19. Database Description - SAHG | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name SAHG Alternative nam...h: Contact address Chie Motono Tel : +81-3-3599-8067 E-mail : Database classification Structure Databases - ...e databases - Protein properties Organism Taxonomy Name: Homo sapiens Taxonomy ID: 9606 Database description... Links: Original website information Database maintenance site The Molecular Profiling Research Center for D...stration Not available About This Database Database Description Download License Update History of This Database Site Policy | Contact Us Database Description - SAHG | LSDB Archive ...

  20. Method for Evaluation of Outage Probability on Random Access Channel in Mobile Communication Systems

    Science.gov (United States)

    Kollár, Martin

    2012-05-01

    In order to access the cell in all mobile communication technologies a so called random-access procedure is used. For example in GSM this is represented by sending the CHANNEL REQUEST message from Mobile Station (MS) to Base Transceiver Station (BTS) which is consequently forwarded as an CHANNEL REQUIRED message to the Base Station Controller (BSC). If the BTS decodes some noise on the Random Access Channel (RACH) as random access by mistake (so- called ‘phantom RACH') then it is a question of pure coincidence which èstablishment cause’ the BTS thinks to have recognized. A typical invalid channel access request or phantom RACH is characterized by an IMMEDIATE ASSIGNMENT procedure (assignment of an SDCCH or TCH) which is not followed by sending an ESTABLISH INDICATION from MS to BTS. In this paper a mathematical model for evaluation of the Power RACH Busy Threshold (RACHBT) in order to guaranty in advance determined outage probability on RACH is described and discussed as well. It focuses on Global System for Mobile Communications (GSM) however the obtained results can be generalized on remaining mobile technologies (ie WCDMA and LTE).

  1. Application of 4-Face Fuel Visual Inspection System during Outage in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Shin, J. C.; Kim, J. I.; Choi, C. B.; Kim, Y. C.; Kang, C. B.

    2008-01-01

    Recently, as a measure to reduce an outage duration in nuclear power plants (NPPs), a four-face fuel visual inspection system (4-FFVIS) built in 4 cameras was introduced by Ahlberg Electronics, Sweden. The 4- FFVIS is used to inspect the external appearance of irradiated fuel assemblies in order to confirm their integrity against mechanical defects and foreign materials. Until now, however, a typical one-face fuel inspection system(1-FFVIS) has been world-widely utilized in NPPs. The 1-FFVIS requires four turns with 90 degree to inspect every face of the fuel assembly, causing a relatively long inspecting time. But the 4- FFVIS allow us to inspect every face of the fuel assembly at the same time. The inspection time with the 4-FFVIS may be less than two minutes per fuel assembly, whereas that with the 1-FFVIS is about six minutes per fuel assembly. In viewpoint of this merit, the 4-FFVIS is expected to be world-widely used in the near future. In this paper, the technical requirements necessary to develop the 4-FFVIS as well as some improvements to complement the current 4-FFVIS are described

  2. Guidelines for prevention in psychology.

    Science.gov (United States)

    2014-04-01

    The effectiveness of prevention to enhance human functioning and reduce psychological distress has been demonstrated. From infancy through adulthood, access to preventive services and interventions is important to improve the quality of life and human functioning and reduce illness and premature death. The importance of prevention is consistent with the Patient Protection and Affordable Care Act of 2010. Even with the increased focus on prevention, psychology training programs rarely require specific courses on prevention. In particular, conceptualizations about best practices in prevention, particularly at the environmental level, are lacking. Therefore, psychologists engaged in prevention can benefit from a set of guidelines that address and inform prevention practices. Accordingly, the Guidelines for Prevention in Psychology are intended to "inform psychologists, the public, and other interested parties regarding desirable professional practices" in prevention. The Prevention Guidelines are recommended based on their potential benefits to the public and the professional practice of psychology. They support prevention as an important area of practice, research, and training for psychologists. The Guidelines give increased attention to prevention within APA, encouraging psychologists to become involved with preventive activities relevant to their area of practice. (PsycINFO Database Record (c) 2014 APA, all rights reserved).

  3. Database Description - PSCDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available abase Description General information of database Database name PSCDB Alternative n...rial Science and Technology (AIST) Takayuki Amemiya E-mail: Database classification Structure Databases - Protein structure Database...554-D558. External Links: Original website information Database maintenance site Graduate School of Informat...available URL of Web services - Need for user registration Not available About This Database Database Descri...ption Download License Update History of This Database Site Policy | Contact Us Database Description - PSCDB | LSDB Archive ...

  4. Database Description - ASTRA | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available abase Description General information of database Database name ASTRA Alternative n...tics Journal Search: Contact address Database classification Nucleotide Sequence Databases - Gene structure,...3702 Taxonomy Name: Oryza sativa Taxonomy ID: 4530 Database description The database represents classified p...(10):1211-6. External Links: Original website information Database maintenance site National Institute of Ad... for user registration Not available About This Database Database Description Dow

  5. Detecting medication errors in the New Zealand pharmacovigilance database: a retrospective analysis.

    Science.gov (United States)

    Kunac, Desireé L; Tatley, Michael V

    2011-01-01

    Despite the traditional focus being adverse drug reactions (ADRs), pharmacovigilance centres have recently been identified as a potentially rich and important source of medication error data. To identify medication errors in the New Zealand Pharmacovigilance database (Centre for Adverse Reactions Monitoring [CARM]), and to describe the frequency and characteristics of these events. A retrospective analysis of the CARM pharmacovigilance database operated by the New Zealand Pharmacovigilance Centre was undertaken for the year 1 January-31 December 2007. All reports, excluding those relating to vaccines, clinical trials and pharmaceutical company reports, underwent a preventability assessment using predetermined criteria. Those events deemed preventable were subsequently classified to identify the degree of patient harm, type of error, stage of medication use process where the error occurred and origin of the error. A total of 1412 reports met the inclusion criteria and were reviewed, of which 4.3% (61/1412) were deemed preventable. Not all errors resulted in patient harm: 29.5% (18/61) were 'no harm' errors but 65.5% (40/61) of errors were deemed to have been associated with some degree of patient harm (preventable adverse drug events [ADEs]). For 5.0% (3/61) of events, the degree of patient harm was unable to be determined as the patient outcome was unknown. The majority of preventable ADEs (62.5% [25/40]) occurred in adults aged 65 years and older. The medication classes most involved in preventable ADEs were antibacterials for systemic use and anti-inflammatory agents, with gastrointestinal and respiratory system disorders the most common adverse events reported. For both preventable ADEs and 'no harm' events, most errors were incorrect dose and drug therapy monitoring problems consisting of failures in detection of significant drug interactions, past allergies or lack of necessary clinical monitoring. Preventable events were mostly related to the prescribing and

  6. Database Description - RPD | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available ase Description General information of database Database name RPD Alternative name Rice Proteome Database...titute of Crop Science, National Agriculture and Food Research Organization Setsuko Komatsu E-mail: Database... classification Proteomics Resources Plant databases - Rice Organism Taxonomy Name: Oryza sativa Taxonomy ID: 4530 Database... description Rice Proteome Database contains information on protei...and entered in the Rice Proteome Database. The database is searchable by keyword,

  7. Database Description - PLACE | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available abase Description General information of database Database name PLACE Alternative name A Database...Kannondai, Tsukuba, Ibaraki 305-8602, Japan National Institute of Agrobiological Sciences E-mail : Databas...e classification Plant databases Organism Taxonomy Name: Tracheophyta Taxonomy ID: 58023 Database...99, Vol.27, No.1 :297-300 External Links: Original website information Database maintenance site National In...- Need for user registration Not available About This Database Database Descripti

  8. Session summaries for workshop meeting on virtual reality applications in process industry maintenance training, outage planning, control room retrofits and design, 17th - 18th September 1998

    International Nuclear Information System (INIS)

    Louka, Michael N.

    1998-09-01

    A well-attended workshop was held in Halden 17th - 18th September 1998 to discuss VR applications in the process industry. In particular, maintenance training, outage planning, decommissioning, control room retrofits, and design were discussed. It is clear that there is a great deal of interest in both current and potential use of VR technology. The workshop participants represented a diverse range of research disciplines, as well as utilities, vendors and regulators (author) (ml)

  9. Database Description - JSNP | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name JSNP Alternative nam...n Science and Technology Agency Creator Affiliation: Contact address E-mail : Database...sapiens Taxonomy ID: 9606 Database description A database of about 197,000 polymorphisms in Japanese populat...1):605-610 External Links: Original website information Database maintenance site Institute of Medical Scien...er registration Not available About This Database Database Description Download License Update History of This Database

  10. Database Description - RED | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available ase Description General information of database Database name RED Alternative name Rice Expression Database...enome Research Unit Shoshi Kikuchi E-mail : Database classification Plant databases - Rice Database classifi...cation Microarray, Gene Expression Organism Taxonomy Name: Oryza sativa Taxonomy ID: 4530 Database descripti... Article title: Rice Expression Database: the gateway to rice functional genomics...nt Science (2002) Dec 7 (12):563-564 External Links: Original website information Database maintenance site

  11. Database Description - ConfC | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available abase Description General information of database Database name ConfC Alternative name Database...amotsu Noguchi Tel: 042-495-8736 E-mail: Database classification Structure Database...s - Protein structure Structure Databases - Small molecules Structure Databases - Nucleic acid structure Database... services - Need for user registration - About This Database Database Description Download License Update History of This Database... Site Policy | Contact Us Database Description - ConfC | LSDB Archive ...

  12. Failure Rate Prediction of Active Component Using PM Basis Database

    International Nuclear Information System (INIS)

    Kim, J. S.; Kim, H. W.; Park, J. S.; Jung, S. G.

    2011-01-01

    The safety security and efficient management of NPPs (Nuclear Power Plants) have been increased after the accident of TEPCO's Fukushima nuclear power stations. The needs for the safety and efficiency are becoming more important because about 90 percent of the NPPs all over the world are more than 20 operation years old. The preventive maintenance criteria need to be flexible, considering long-term development of the equipment performance and preventive maintenance. The PMBD (Preventive Maintenance Basis Database) program was widely used for optimization of the preventive maintenance criteria. PMBD program contains all kinds of failure mechanisms for each equipment that may occur in the power plant based on RCM(Reliability-Centered Maintenance) and numerically calculate the variation of reliability and failure rate based on PM interval changes. In this study, propriety evaluation of preventive maintenance task, cycle, technical basis for cost effective preventive maintenance strategy and an appropriate evaluation were suggested by the case application of PMBD for major components in the NPPs

  13. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 5: Analysis of core damage frequency from seismic events for plant operational state 5 during a refueling outage

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Davis, P.R.; Ravindra, M.K.; Tong, W.H.

    1994-08-01

    In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Sandia National Laboratories studying a boiling water reactor (Grand Gulf), and the other at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1). Both the Sandia and Brookhaven projects have examined only accidents initiated by internal plant faults---so-called ''internal initiators.'' This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling outage conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Grand Gulf. All of the many systems modeling assumptions, component non-seismic failure rates, and human effort rates that were used in the internal-initiator study at Grand Gulf have been adopted here, so that the results of the study can be as comparable as possible. Both the Sandia study and this study examine only one shutdown plant operating state (POS) at Grand Gulf, namely POS 5 representing cold shutdown during a refueling outage. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POS 5. The results of the analysis are that the core-damage frequency for earthquake-initiated accidents during refueling outages in POS 5 is found to be quite low in absolute terms, less than 10 -7 /year

  14. Database management systems understanding and applying database technology

    CERN Document Server

    Gorman, Michael M

    1991-01-01

    Database Management Systems: Understanding and Applying Database Technology focuses on the processes, methodologies, techniques, and approaches involved in database management systems (DBMSs).The book first takes a look at ANSI database standards and DBMS applications and components. Discussion focus on application components and DBMS components, implementing the dynamic relationship application, problems and benefits of dynamic relationship DBMSs, nature of a dynamic relationship application, ANSI/NDL, and DBMS standards. The manuscript then ponders on logical database, interrogation, and phy

  15. Development of Krsko Severe Accident Management Database (SAMD)

    International Nuclear Information System (INIS)

    Basic, I.; Kocnar, R.

    1996-01-01

    Severe Accident Management is a framework to identify and implement the Emergency Response Capabilities that can be used to prevent or mitigate severe accidents and their consequences. Krsko Severe Accident Management Database documents the severe accident management activities which are developed in the NPP Krsko, based on the Krsko IPE (Individual Plant Examination) insights and Generic WOG SAMGs (Westinghouse Owners Group Severe Accident Management Guidance). (author)

  16. Database Description - RMG | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available ase Description General information of database Database name RMG Alternative name ...raki 305-8602, Japan National Institute of Agrobiological Sciences E-mail : Database... classification Nucleotide Sequence Databases Organism Taxonomy Name: Oryza sativa Japonica Group Taxonomy ID: 39947 Database...rnal: Mol Genet Genomics (2002) 268: 434–445 External Links: Original website information Database...available URL of Web services - Need for user registration Not available About This Database Database Descri

  17. Relational databases

    CERN Document Server

    Bell, D A

    1986-01-01

    Relational Databases explores the major advances in relational databases and provides a balanced analysis of the state of the art in relational databases. Topics covered include capture and analysis of data placement requirements; distributed relational database systems; data dependency manipulation in database schemata; and relational database support for computer graphics and computer aided design. This book is divided into three sections and begins with an overview of the theory and practice of distributed systems, using the example of INGRES from Relational Technology as illustration. The

  18. Database Description - DGBY | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name DGBY Alternative name Database...EL: +81-29-838-8066 E-mail: Database classification Microarray Data and other Gene Expression Databases Orga...nism Taxonomy Name: Saccharomyces cerevisiae Taxonomy ID: 4932 Database descripti...-called phenomics). We uploaded these data on this website which is designated DGBY(Database for Gene expres...ma J, Ando A, Takagi H. Journal: Yeast. 2008 Mar;25(3):179-90. External Links: Original website information Database

  19. Database Description - KOME | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name KOME Alternative nam... Sciences Plant Genome Research Unit Shoshi Kikuchi E-mail : Database classification Plant databases - Rice ...Organism Taxonomy Name: Oryza sativa Taxonomy ID: 4530 Database description Information about approximately ...Hayashizaki Y, Kikuchi S. Journal: PLoS One. 2007 Nov 28; 2(11):e1235. External Links: Original website information Database...OS) Rice mutant panel database (Tos17) A Database of Plant Cis-acting Regulatory

  20. Databases

    Directory of Open Access Journals (Sweden)

    Nick Ryan

    2004-01-01

    Full Text Available Databases are deeply embedded in archaeology, underpinning and supporting many aspects of the subject. However, as well as providing a means for storing, retrieving and modifying data, databases themselves must be a result of a detailed analysis and design process. This article looks at this process, and shows how the characteristics of data models affect the process of database design and implementation. The impact of the Internet on the development of databases is examined, and the article concludes with a discussion of a range of issues associated with the recording and management of archaeological data.

  1. Database Description - SSBD | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name SSBD Alternative nam...ss 2-2-3 Minatojima-minamimachi, Chuo-ku, Kobe 650-0047, Japan, RIKEN Quantitative Biology Center Shuichi Onami E-mail: Database... classification Other Molecular Biology Databases Database classification Dynamic databa...elegans Taxonomy ID: 6239 Taxonomy Name: Escherichia coli Taxonomy ID: 562 Database description Systems Scie...i Onami Journal: Bioinformatics/April, 2015/Volume 31, Issue 7 External Links: Original website information Database

  2. Database Description - GETDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available abase Description General information of database Database name GETDB Alternative n...ame Gal4 Enhancer Trap Insertion Database DOI 10.18908/lsdba.nbdc00236-000 Creator Creator Name: Shigeo Haya... Chuo-ku, Kobe 650-0047 Tel: +81-78-306-3185 FAX: +81-78-306-3183 E-mail: Database classification Expression... Invertebrate genome database Organism Taxonomy Name: Drosophila melanogaster Taxonomy ID: 7227 Database des...riginal website information Database maintenance site Drosophila Genetic Resource

  3. JICST Factual DatabaseJICST Chemical Substance Safety Regulation Database

    Science.gov (United States)

    Abe, Atsushi; Sohma, Tohru

    JICST Chemical Substance Safety Regulation Database is based on the Database of Safety Laws for Chemical Compounds constructed by Japan Chemical Industry Ecology-Toxicology & Information Center (JETOC) sponsored by the Sience and Technology Agency in 1987. JICST has modified JETOC database system, added data and started the online service through JOlS-F (JICST Online Information Service-Factual database) in January 1990. JICST database comprises eighty-three laws and fourteen hundred compounds. The authors outline the database, data items, files and search commands. An example of online session is presented.

  4. Risk-based evaluation of allowed outage time and surveillance test interval extensions for nuclear power plants

    International Nuclear Information System (INIS)

    Gibelli, Sonia Maria Orlando

    2008-03-01

    The main goal of this work is, through the use of Probabilistic Safety Analysis (PSA), to evaluate Technical Specification (TS) Allowed Outage Times (AOT) and Surveillance Test Intervals (STI) extensions for Angra 1 nuclear power plant. PSA has been incorporated as an additional tool, required as part of NPP licensing process. The risk measure used in this work is the Core Damage Frequency (CDF), obtained from the Angra 1 PSA Level 1. AOT and STI extensions are calculated for the Safety Injection System (SIS), Service water System (SAS) and Auxiliary Feedwater System (AFS) through the use of SAPHIRE code. In order to compensate for the risk increase caused by the extensions, compensatory measures as test of redundant train prior to entering maintenance and staggered test strategy are proposed. Results have shown that the proposed AOT extensions are acceptable for the SIS and SAS with the implementation of compensatory measures. The proposed AOT extension is not acceptable for the AFS. The STI extensions are acceptable for all three systems. (author)

  5. Development and Field Application Experience of the Reactor Internal Preventive Maintenance Technology

    International Nuclear Information System (INIS)

    Kanno, A.; Yoshikubo, F.; Morinaka, R.; Tanaka, M.; Hasegawa, K.; Hatou, H.

    2012-01-01

    A reactor internal preventive maintenance technology, Water Jet Peening (WJP), has been developed as a stress corrosion cracking (SCC) mitigation technology that has been successfully implemented during refuelling outages at 15 Boiling Water Reactors (BWR) and three (3) Advanced BWRs (during the site construction and in the shop fabrication) in Japan. WJP is one of the most successful underwater peening methods, which utilizes the energy generated from the collapsing of bubbles produced by the cavitating water jet nozzle. The energy produced from the cavitations introduces compressive residual stress on the metal surface and subsurface up to a depth of several hundred micrometers. Most recently, we have successfully applied WJP to the bottom head components and to some cracked areas on the shroud support in the Tokai-2 plant. In the case of the bottom head components, we produced inspection and repair tooling as a contingency in the event SCC was identified and would be required to be repaired prior to the implementation of WJP. (author)

  6. Database Description - KAIKOcDNA | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us KAIKOcDNA Database Description General information of database Database name KAIKOcDNA Alter...National Institute of Agrobiological Sciences Akiya Jouraku E-mail : Database cla...ssification Nucleotide Sequence Databases Organism Taxonomy Name: Bombyx mori Taxonomy ID: 7091 Database des...rnal: G3 (Bethesda) / 2013, Sep / vol.9 External Links: Original website information Database maintenance si...available URL of Web services - Need for user registration Not available About This Database Database

  7. Download - Trypanosomes Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Trypanosomes Database Download First of all, please read the license of this database. Data ...1.4 KB) Simple search and download Downlaod via FTP FTP server is sometimes jammed. If it is, access [here]. About This Database Data...base Description Download License Update History of This Database Site Policy | Contact Us Download - Trypanosomes Database | LSDB Archive ...

  8. License - Arabidopsis Phenome Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Arabidopsis Phenome Database License License to Use This Database Last updated : 2017/02/27 You may use this database...cense specifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative ...Commons Attribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...ative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, you ar

  9. Data Linkage Graph: computation, querying and knowledge discovery of life science database networks

    Directory of Open Access Journals (Sweden)

    Lange Matthias

    2007-12-01

    Full Text Available To support the interpretation of measured molecular facts, like gene expression experiments or EST sequencing, the functional or the system biological context has to be considered. Doing so, the relationship to existing biological knowledge has to be discovered. In general, biological knowledge is worldwide represented in a network of databases. In this paper we present a method for knowledge extraction in life science databases, which prevents the scientists from screen scraping and web clicking approaches.

  10. Database Description - AcEST | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available abase Description General information of database Database name AcEST Alternative n...hi, Tokyo-to 192-0397 Tel: +81-42-677-1111(ext.3654) E-mail: Database classificat...eneris Taxonomy ID: 13818 Database description This is a database of EST sequences of Adiantum capillus-vene...(3): 223-227. External Links: Original website information Database maintenance site Plant Environmental Res...base Database Description Download License Update History of This Database Site Policy | Contact Us Database Description - AcEST | LSDB Archive ...

  11. License - SKIP Stemcell Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us SKIP Stemcell Database License License to Use This Database Last updated : 2017/03/13 You may use this database...specifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Common...s Attribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...al ... . The summary of the Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  12. KALIMER database development

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwan Seong; Lee, Yong Bum; Jeong, Hae Yong; Ha, Kwi Seok

    2003-03-01

    KALIMER database is an advanced database to utilize the integration management for liquid metal reactor design technology development using Web applications. KALIMER design database is composed of results database, Inter-Office Communication (IOC), 3D CAD database, and reserved documents database. Results database is a research results database during all phase for liquid metal reactor design technology development of mid-term and long-term nuclear R and D. IOC is a linkage control system inter sub project to share and integrate the research results for KALIMER. 3D CAD database is a schematic overview for KALIMER design structure. And reserved documents database is developed to manage several documents and reports since project accomplishment.

  13. KALIMER database development

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Lee, Yong Bum; Jeong, Hae Yong; Ha, Kwi Seok

    2003-03-01

    KALIMER database is an advanced database to utilize the integration management for liquid metal reactor design technology development using Web applications. KALIMER design database is composed of results database, Inter-Office Communication (IOC), 3D CAD database, and reserved documents database. Results database is a research results database during all phase for liquid metal reactor design technology development of mid-term and long-term nuclear R and D. IOC is a linkage control system inter sub project to share and integrate the research results for KALIMER. 3D CAD database is a schematic overview for KALIMER design structure. And reserved documents database is developed to manage several documents and reports since project accomplishment

  14. A New Reversible Database Watermarking Approach with Firefly Optimization Algorithm

    Directory of Open Access Journals (Sweden)

    Mustafa Bilgehan Imamoglu

    2017-01-01

    Full Text Available Up-to-date information is crucial in many fields such as medicine, science, and stock market, where data should be distributed to clients from a centralized database. Shared databases are usually stored in data centers where they are distributed over insecure public access network, the Internet. Sharing may result in a number of problems such as unauthorized copies, alteration of data, and distribution to unauthorized people for reuse. Researchers proposed using watermarking to prevent problems and claim digital rights. Many methods are proposed recently to watermark databases to protect digital rights of owners. Particularly, optimization based watermarking techniques draw attention, which results in lower distortion and improved watermark capacity. Difference expansion watermarking (DEW with Firefly Algorithm (FFA, a bioinspired optimization technique, is proposed to embed watermark into relational databases in this work. Best attribute values to yield lower distortion and increased watermark capacity are selected efficiently by the FFA. Experimental results indicate that FFA has reduced complexity and results in less distortion and improved watermark capacity compared to similar works reported in the literature.

  15. Database Description - RPSD | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name RPSD Alternative nam...e Rice Protein Structure Database DOI 10.18908/lsdba.nbdc00749-000 Creator Creator Name: Toshimasa Yamazaki ... Ibaraki 305-8602, Japan National Institute of Agrobiological Sciences Toshimasa Yamazaki E-mail : Databas...e classification Structure Databases - Protein structure Organism Taxonomy Name: Or...or name(s): Journal: External Links: Original website information Database maintenance site National Institu

  16. Database Description - FANTOM5 | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us FANTOM5 Database Description General information of database Database name FANTOM5 Alternati...me: Rattus norvegicus Taxonomy ID: 10116 Taxonomy Name: Macaca mulatta Taxonomy ID: 9544 Database descriptio...l Links: Original website information Database maintenance site RIKEN Center for Life Science Technologies, ...ilable Web services Not available URL of Web services - Need for user registration Not available About This Database Database... Description Download License Update History of This Database Site Policy | Contact Us Database Description - FANTOM5 | LSDB Archive ...

  17. An evaluation of high-dose jobs for ALARA improvement

    International Nuclear Information System (INIS)

    Mun, J. H.; Kim, H. S.

    1997-01-01

    It is well known that about 70 percent of occupational dose have incurred from maintenance jobs at outage period. To reduce occupational dose, first, the high-dose jobs at the outage period should be identified and evaluated. For this, the database program is used, which contains the ORE data of reference plants, Kori Units 3 and 4. As a result, it is found that the jobs related to steam generator are the highest dose jobs in terms of collective ORE dose. From the analysis of the job procedures of those jobs, the ALARA improvements are also derived

  18. NoSQL databases

    OpenAIRE

    Mrozek, Jakub

    2012-01-01

    This thesis deals with database systems referred to as NoSQL databases. In the second chapter, I explain basic terms and the theory of database systems. A short explanation is dedicated to database systems based on the relational data model and the SQL standardized query language. Chapter Three explains the concept and history of the NoSQL databases, and also presents database models, major features and the use of NoSQL databases in comparison with traditional database systems. In the fourth ...

  19. Water-hammer prevention, mitigation, and accommodation: a perspective

    International Nuclear Information System (INIS)

    Kim, J.H.

    1987-01-01

    The purpose of this paper is to present an industry perspective on water hammer, revisit the issues, and renew interest in this area with aim to prevent, mitigate, and accommodate water hammer. Water hammer keeps recurring in nuclear power plants and damages plant components and impacts on plant operations and availability through forced outages of plants. The implication is that water hammer in nuclear power plants still needs attention and is a problem that has not been fundamentally resolved. The paper displays statistics of the reported water hammer events between 1969 and 1985. The consequences of these water hammer events were: pipe support damage (hangers, anchors, and snubbers), 60%; component damage (piping, pumps, and valves), 17%; reactor trip, 10%; and plant shutdown, 7%. Reactor trips and plant shutdowns account for 17% of the event consequences. At the request of the nuclear utility industry, a workshop on water hammer was sponsored by the Electric Power Research Institute (EPRI), with cosponsorship from Northeast Utility Service Company, Yankee Atomic Electric Company, and Boston Edison Company, which drew some 90 specialists representing 28 utility companies as well as other nuclear industry, academia, and the NRC. The workshop recommendations are summarized

  20. Federated or cached searches: providing expected performance from multiple invasive species databases

    Science.gov (United States)

    Graham, Jim; Jarnevich, Catherine S.; Simpson, Annie; Newman, Gregory J.; Stohlgren, Thomas J.

    2011-01-01

    Invasive species are a universal global problem, but the information to identify them, manage them, and prevent invasions is stored around the globe in a variety of formats. The Global Invasive Species Information Network is a consortium of organizations working toward providing seamless access to these disparate databases via the Internet. A distributed network of databases can be created using the Internet and a standard web service protocol. There are two options to provide this integration. First, federated searches are being proposed to allow users to search “deep” web documents such as databases for invasive species. A second method is to create a cache of data from the databases for searching. We compare these two methods, and show that federated searches will not provide the performance and flexibility required from users and a central cache of the datum are required to improve performance.

  1. Database Description - DMPD | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name DMPD Alternative nam...e Dynamic Macrophage Pathway CSML Database DOI 10.18908/lsdba.nbdc00558-000 Creator Creator Name: Masao Naga...ty of Tokyo 4-6-1 Shirokanedai, Minato-ku, Tokyo 108-8639 Tel: +81-3-5449-5615 FAX: +83-3-5449-5442 E-mail: Database...606 Taxonomy Name: Mammalia Taxonomy ID: 40674 Database description DMPD collects...e(s) Article title: Author name(s): Journal: External Links: Original website information Database maintenan

  2. Database Dump - fRNAdb | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us fRNAdb Database Dump Data detail Data name Database Dump DOI 10.18908/lsdba.nbdc00452-002 De... data (tab separeted text) Data file File name: Database_Dump File URL: ftp://ftp....biosciencedbc.jp/archive/frnadb/LATEST/Database_Dump File size: 673 MB Simple search URL - Data acquisition...s. Data analysis method - Number of data entries 4 files - About This Database Database Description Download... License Update History of This Database Site Policy | Contact Us Database Dump - fRNAdb | LSDB Archive ...

  3. [Scientific Evidence on Preventive Interventions in Childhood Obesity].

    Science.gov (United States)

    Alba-Martín, Raquel

    The increasing prevalence of obesity or overweight at all ages, their associated morbidity and mortality associated, and the increased perception of the problem by the society have generated several hypotheses in response to the scientific and the international community. Investigate the preventive interventions in childhood obesity so far. Integrative review during the study period from April 2013 to November 2014. The MEDLINE international database was used, including PubMed, the Cochrane Library (Issue 4 2002), the national database Isooc (CSIC) national database, as well as the Internet. The review included health articles published in Spanish and English between 1990 and 2014 that focused on or included education, prevention, diagnostic, and treatment of obesity interventions. Of the 726 articles identified, 34 of most relevant (peer reviewed) were selected. It was noted that there is limited generisable evidence on interventions that could be implemented in Primary Care or referral services available, although numerous studies suggest that improvements in the overweight are possible. Despite the abundant literature and that many institutions place childhood obesity as one of the priorities of Public Health, we face the paradox that the evidence on cost-effectiveness of prevention interventions is sparse. Knowing these gaps in knowledge should lead to filling them with rigorous and well-designed studies. Copyright © 2016 Asociación Colombiana de Psiquiatría. Publicado por Elsevier España. All rights reserved.

  4. DOT Online Database

    Science.gov (United States)

    Page Home Table of Contents Contents Search Database Search Login Login Databases Advisory Circulars accessed by clicking below: Full-Text WebSearch Databases Database Records Date Advisory Circulars 2092 5 data collection and distribution policies. Document Database Website provided by MicroSearch

  5. A methodology based in particle swarm optimization algorithm for preventive maintenance focused in reliability and cost

    International Nuclear Information System (INIS)

    Luz, Andre Ferreira da

    2009-01-01

    In this work, a Particle Swarm Optimization Algorithm (PSO) is developed for preventive maintenance optimization. The proposed methodology, which allows the use flexible intervals between maintenance interventions, instead of considering fixed periods (as usual), allows a better adaptation of scheduling in order to deal with the failure rates of components under aging. Moreover, because of this flexibility, the planning of preventive maintenance becomes a difficult task. Motivated by the fact that the PSO has proved to be very competitive compared to other optimization tools, this work investigates the use of PSO as an alternative tool of optimization. Considering that PSO works in a real and continuous space, it is a challenge to use it for discrete optimization, in which scheduling may comprise variable number of maintenance interventions. The PSO model developed in this work overcome such difficulty. The proposed PSO searches for the best policy for maintaining and considers several aspects, such as: probability of needing repair (corrective maintenance), the cost of such repairs, typical outage times, costs of preventive maintenance, the impact of maintaining the reliability of systems as a whole, and the probability of imperfect maintenance. To evaluate the proposed methodology, we investigate an electro-mechanical system consisting of three pumps and four valves, High Pressure Injection System (HPIS) of a PWR. Results show that PSO is quite efficient in finding the optimum preventive maintenance policies for the HPIS. (author)

  6. Databases

    Digital Repository Service at National Institute of Oceanography (India)

    Kunte, P.D.

    Information on bibliographic as well as numeric/textual databases relevant to coastal geomorphology has been included in a tabular form. Databases cover a broad spectrum of related subjects like coastal environment and population aspects, coastline...

  7. Database Description - eSOL | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name eSOL Alternative nam...eator Affiliation: The Research and Development of Biological Databases Project, National Institute of Genet...nology 4259 Nagatsuta-cho, Midori-ku, Yokohama, Kanagawa 226-8501 Japan Email: Tel.: +81-45-924-5785 Database... classification Protein sequence databases - Protein properties Organism Taxonomy Name: Escherichia coli Taxonomy ID: 562 Database...i U S A. 2009 Mar 17;106(11):4201-6. External Links: Original website information Database maintenance site

  8. "Mr. Database" : Jim Gray and the History of Database Technologies.

    Science.gov (United States)

    Hanwahr, Nils C

    2017-12-01

    Although the widespread use of the term "Big Data" is comparatively recent, it invokes a phenomenon in the developments of database technology with distinct historical contexts. The database engineer Jim Gray, known as "Mr. Database" in Silicon Valley before his disappearance at sea in 2007, was involved in many of the crucial developments since the 1970s that constitute the foundation of exceedingly large and distributed databases. Jim Gray was involved in the development of relational database systems based on the concepts of Edgar F. Codd at IBM in the 1970s before he went on to develop principles of Transaction Processing that enable the parallel and highly distributed performance of databases today. He was also involved in creating forums for discourse between academia and industry, which influenced industry performance standards as well as database research agendas. As a co-founder of the San Francisco branch of Microsoft Research, Gray increasingly turned toward scientific applications of database technologies, e. g. leading the TerraServer project, an online database of satellite images. Inspired by Vannevar Bush's idea of the memex, Gray laid out his vision of a Personal Memex as well as a World Memex, eventually postulating a new era of data-based scientific discovery termed "Fourth Paradigm Science". This article gives an overview of Gray's contributions to the development of database technology as well as his research agendas and shows that central notions of Big Data have been occupying database engineers for much longer than the actual term has been in use.

  9. Mathematics for Databases

    NARCIS (Netherlands)

    ir. Sander van Laar

    2007-01-01

    A formal description of a database consists of the description of the relations (tables) of the database together with the constraints that must hold on the database. Furthermore the contents of a database can be retrieved using queries. These constraints and queries for databases can very well be

  10. Cooperative jamming power control to enhance secrecy communications of AF Relaying systems for Rayleigh fading channel

    KAUST Repository

    Park, Kihong

    2012-09-01

    In this paper, we investigate secrecy communications in two-hop wireless relaying networks which consist of one source, one amplify-and-forward (AF) relay, one legitimate destination, and one eavesdropper. To prevent the eavesdropper from intercepting the source message, we make the destination send the intended noise to the AF relay during the first phase. This is referred to as cooperative jamming. According to the channel information at the destination, we address two types of jamming power allocation; (i) rate-optimal power allocation and (ii) outage-optimal power allocation. More specifically, without the instantaneous channel knowledge for the eavesdropper side, the outage probability of the secrecy rate is minimized with respect to the intended noise power level. We show that the outage-optimal allocation gives almost the same outage probability as the rateoptimal one. In addition, the jamming power consumption can be significantly reduced compared to the fixed and rate-optimal power allocation methods. © 2012 IEEE.

  11. An exact power series formula of the outage probability with noise and interference over generalized fading channels

    KAUST Repository

    Rached, Nadhir B.

    2016-12-24

    In this paper, we develop a generalized momentbased approach for the evaluation of the outage probability (OP) in the presence of co-channel interference and additive white Gaussian noise. The proposed method allows the evaluation of the OP of the signal-to-interference-plus-noise ratio by a power series expansion in the threshold value. Its main advantage is that it does not require a particular distribution for the interference channels. The only necessary ingredients are a power series expansion for the cumulative distribution function of the desired user power and the cross-moments of the interferers\\' powers. These requirements are easily met in many practical fading models, for which the OP might not be obtained in closed-form expression. For a sake of illustration, we consider the application of our method to the Rician fading environment. Under this setting, we carry out a convergence study of the proposed power series and corroborate the validity of our method for different values of fading parameters and various numbers of co-channel interferers.

  12. Tracking Traffickers. The IAEA Incident and Trafficking Database

    International Nuclear Information System (INIS)

    Webb, Greg

    2013-01-01

    Radioactive material is missing from a hospital. Contaminated metal is found in a scrap yard. Smugglers try to peddle nuclear- weapon-usable material. These different scenarios illustrate the risks that these materials can pose to human safety and security. To assess those risks and to develop strategies to reduce them, States must understand the implications and the scope of such incidents that are occurring around the world. To better understand and respond to these events, the IAEA maintains an Incident and Trafficking Database (ITDB) which collects information from 122 participating States and some select international organizations. They are asked to share data on a voluntary basis about incidents in which nuclear and other radioactive material has fallen ''out of regulatory control.'' This could mean reporting cases of material that has gone missing, or discoveries of material where none was expected. The cases range from the innocent misplacement of industrial radioactive sources to criminal smuggling efforts which could aid terrorist acts. This information is shared among ITDB participants, and IAEA analysts try to identify trends and characteristics that could help prevent the misuse of these potentially dangerous materials. ''The ITDB has become an internationally recognized tool for States to study the extent and nature of these incidents,'' said John Hilliard, head of the Information Management and Coordination Section that administers the database. ''We've learned a lot by studying them, and we hope the information helps us prevent accidents or crimes in the future.'' The IAEA established the database in 1995 after States became alarmed by a growing number of trafficking incidents in the early 1990s. The service was originally operated by the Department of Safeguards, but later moved to the Department of Nuclear Safety and Security, where the Office of Nuclear Security now administers all the data collection and analysis

  13. Database security - how can developers and DBAs do it together and what can other Service Managers learn from it

    CERN Multimedia

    CERN. Geneva

    2014-01-01

    This talk gives an overview of security threats affecting databases, preventive measures that we are taking at CERN and best practices in the industry. The presentation will describe how generic the threats are and how can other service managers profit from the database experience to protect other systems.

  14. BAPA Database: Linking landslide occurrence with rainfall in Asturias (Spain)

    Science.gov (United States)

    Valenzuela, Pablo; José Domínguez-Cuesta, María; Jiménez-Sánchez, Montserrat

    2015-04-01

    Asturias is a region in northern Spain with a temperate and humid climate. In this region, slope instability processes are very common and often cause economic losses and, sometimes, human victims. To prevent the geological risk involved, it is of great interest to predict landslide spatial and temporal occurrence. Some previous investigations have shown the importance of rainfall as a trigger factor. Despite the high incidence of these phenomena in Asturias, there are no databases of recent and actual landslides. The BAPA Project (Base de Datos de Argayos del Principado de Asturias - Principality of Asturias Landslide Database) aims to create an inventory of slope instabilities which have occurred between 1980 and 2015. The final goal is to study in detail the relationship between rainfall and slope instabilities in Asturias, establishing precipitation thresholds and soil moisture conditions necessary to instability triggering. This work presents the database progress showing its structure divided into various fields that essentially contain information related to spatial, temporal, geomorphological and damage data.

  15. Database development and management

    CERN Document Server

    Chao, Lee

    2006-01-01

    Introduction to Database Systems Functions of a DatabaseDatabase Management SystemDatabase ComponentsDatabase Development ProcessConceptual Design and Data Modeling Introduction to Database Design Process Understanding Business ProcessEntity-Relationship Data Model Representing Business Process with Entity-RelationshipModelTable Structure and NormalizationIntroduction to TablesTable NormalizationTransforming Data Models to Relational Databases .DBMS Selection Transforming Data Models to Relational DatabasesEnforcing ConstraintsCreating Database for Business ProcessPhysical Design and Database

  16. Database reliability engineering designing and operating resilient database systems

    CERN Document Server

    Campbell, Laine

    2018-01-01

    The infrastructure-as-code revolution in IT is also affecting database administration. With this practical book, developers, system administrators, and junior to mid-level DBAs will learn how the modern practice of site reliability engineering applies to the craft of database architecture and operations. Authors Laine Campbell and Charity Majors provide a framework for professionals looking to join the ranks of today’s database reliability engineers (DBRE). You’ll begin by exploring core operational concepts that DBREs need to master. Then you’ll examine a wide range of database persistence options, including how to implement key technologies to provide resilient, scalable, and performant data storage and retrieval. With a firm foundation in database reliability engineering, you’ll be ready to dive into the architecture and operations of any modern database. This book covers: Service-level requirements and risk management Building and evolving an architecture for operational visibility ...

  17. Solving Relational Database Problems with ORDBMS in an Advanced Database Course

    Science.gov (United States)

    Wang, Ming

    2011-01-01

    This paper introduces how to use the object-relational database management system (ORDBMS) to solve relational database (RDB) problems in an advanced database course. The purpose of the paper is to provide a guideline for database instructors who desire to incorporate the ORDB technology in their traditional database courses. The paper presents…

  18. Generalized Database Management System Support for Numeric Database Environments.

    Science.gov (United States)

    Dominick, Wayne D.; Weathers, Peggy G.

    1982-01-01

    This overview of potential for utilizing database management systems (DBMS) within numeric database environments highlights: (1) major features, functions, and characteristics of DBMS; (2) applicability to numeric database environment needs and user needs; (3) current applications of DBMS technology; and (4) research-oriented and…

  19. License - Trypanosomes Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data List Contact us Trypanoso... Attribution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as follows: Trypanoso...nse Update History of This Database Site Policy | Contact Us License - Trypanosomes Database | LSDB Archive ...

  20. The OAuth 2.0 Web Authorization Protocol for the Internet Addiction Bioinformatics (IABio) Database.

    Science.gov (United States)

    Choi, Jeongseok; Kim, Jaekwon; Lee, Dong Kyun; Jang, Kwang Soo; Kim, Dai-Jin; Choi, In Young

    2016-03-01

    Internet addiction (IA) has become a widespread and problematic phenomenon as smart devices pervade society. Moreover, internet gaming disorder leads to increases in social expenditures for both individuals and nations alike. Although the prevention and treatment of IA are getting more important, the diagnosis of IA remains problematic. Understanding the neurobiological mechanism of behavioral addictions is essential for the development of specific and effective treatments. Although there are many databases related to other addictions, a database for IA has not been developed yet. In addition, bioinformatics databases, especially genetic databases, require a high level of security and should be designed based on medical information standards. In this respect, our study proposes the OAuth standard protocol for database access authorization. The proposed IA Bioinformatics (IABio) database system is based on internet user authentication, which is a guideline for medical information standards, and uses OAuth 2.0 for access control technology. This study designed and developed the system requirements and configuration. The OAuth 2.0 protocol is expected to establish the security of personal medical information and be applied to genomic research on IA.