WorldWideScience

Sample records for prepare contingency plans

  1. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  2. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  3. National Contingency Plan Subpart J

    Science.gov (United States)

    Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.

  4. Licensee safeguards contingency plans

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Nuclear Regulatory Commission is amending its regulations to require that licensees authorized to operate a nuclear reactor (other than certain research and test reactors), and those authorized to possess strategic quantities of plutonium, uranium-233, or uranium-235 develop and implement acceptable plans for responding to threats, thefts, and industrial sabotage of licensed nuclear materials and facilities. The plans will provide a structured, orderly, and timely response to safeguards contingencies and will be an important segment of NRC's contingency planning programs. Licensee safeguards contingency plans will result in organizing licensee's safeguards resources in such a way that, in the unlikely event of a safeguards contingency, the responding participants will be identified, their several responsibilities specified, and their responses coordinated

  5. Appendix F - Sample Contingency Plan

    Science.gov (United States)

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  6. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  7. Yampa River Valley sub-area contingency plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Yampa River Valley sub-area contingency plan (Contingency Plan) has been prepared for two counties in northwestern Colorado: Moffat County and Routt County. The Contingency Plan is provided in two parts, the Contingency Plan and the Emergency Response Action Plan (ERAP). The Contingency Plan provides information that should be helpful in planning to minimize the impact of an oil spill or hazardous material incident. It contains discussions of planning and response role, hazards identification, vulnerability analysis, risk analysis, cleanup, cost recovery, training, and health and safety. It includes information on the incident command system, notifications, response capabilities, emergency response organizations, evacuation and shelter-in-place, and immediate actions.

  8. 30 CFR 282.26 - Contingency Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral... § 282.26 Contingency Plan. (a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...

  9. 49 CFR 1544.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1544.301 Section 1544.301... COMMERCIAL OPERATORS Threat and Threat Response § 1544.301 Contingency plan. Each aircraft operator must adopt a contingency plan and must: (a) Implement its contingency plan when directed by TSA. (b) Ensure...

  10. 49 CFR 1542.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1542.301 Section 1542.301..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...

  11. Network location theory and contingency planning

    Energy Technology Data Exchange (ETDEWEB)

    Hakimi, S L

    1983-08-01

    A brief survey of results in network location theory is first presented. Then, a systems view of contingency planning is described. Finally, some results in location theory are re-examined and it is shown that they are motivated by contingency planning considerations. Some new issues and problems in location theory are described, which, if properly tackled, will have a substantial impact on contingency planning in transportation.

  12. 40 CFR 264.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan... called upon to provide emergency services. [Comment: The contingency plan must be submitted to the...

  13. 40 CFR 265.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  14. 40 CFR 265.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 265.54... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) Applicable regulations...

  15. 40 CFR 264.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 264.54 Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be...

  16. Year 2000 Contingency Planning and Cost Reporting at the Defense Finance and Accounting Service

    National Research Council Canada - National Science Library

    1998-01-01

    ...: complied with the requirements of the DoD Year 2000 Management Plan, prepared adequate Year 2000 system-level contingency plans, and reported complete and reliable Year 2000 system cost estimates...

  17. 40 CFR 264.227 - Emergency repairs; contingency plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Emergency repairs; contingency plans... FACILITIES Surface Impoundments § 264.227 Emergency repairs; contingency plans. (a) A surface impoundment... days after detecting the problem. (c) As part of the contingency plan required in subpart D of this...

  18. 10 CFR 72.184 - Safeguards contingency plan.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Safeguards contingency plan. 72.184 Section 72.184 Energy... Protection § 72.184 Safeguards contingency plan. (a) The requirements of the licensee's safeguards contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part...

  19. Radiological Contingency Planning for the Mars Science Laboratory Launch

    Energy Technology Data Exchange (ETDEWEB)

    Paul P. Guss

    2008-04-01

    This paper describes the contingency planning for the launch of the Mars Science Laboratory scheduled for the 21-day window beginning on September 15, 2009. National Security Technologies, LLC (NSTec), based in Las Vegas, Nevada, will support the U.S. Department of Energy (DOE) in its role for managing the overall radiological contingency planning support effort. This paper will focus on new technologies that NSTec’s Remote Sensing Laboratory (RSL) is developing to enhance the overall response capability that would be required for a highly unlikely anomaly. This paper presents recent advances in collecting and collating data transmitted from deployed teams and sensors. RSL is responsible to prepare the contingency planning for a range of areas from monitoring and assessment, sample collection and control, contaminated material release criteria, data management, reporting, recording, and even communications. The tools RSL has available to support these efforts will be reported. The data platform RSL will provide shall also be compatible with integration of assets and field data acquired with other DOE, National Space and Aeronautics and Space Administration (NASA), state, and local resources, personnel, and equipment. This paper also outlines the organizational structure for response elements in radiological contingency planning.

  20. Standard format and content for radiological contingency plans for fuel cycle and materials facilities. Regulatory report

    International Nuclear Information System (INIS)

    1981-07-01

    This report is issued as guidance to those fuel cycle and major materials licensees who are required by the NRC to prepare and submit a radiological contingency plan. This Standard Format has been prepared to help assure uniformity and completeness in the preparation of those plans

  1. Contingency planning in southern Africa: Events rather than processes?

    OpenAIRE

    Elias Mabaso; Siambabala B. Manyena

    2013-01-01

    With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork ...

  2. 40 CFR 300.210 - Federal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...

  3. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  4. Contingency planning in southern Africa: Events rather than processes?

    Directory of Open Access Journals (Sweden)

    Elias Mabaso

    2013-09-01

    Full Text Available With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork was used. The findings show that (1 there was a wide gap between theory and practice in contingency planning, (2 response activities rarely reflected projected scenarios and (3 resources were inadequate for effective contingency planning. We conclude that unless these issues are addressed, contingency planning is likely to remain a theoretical rather than a practical tool for building disaster-resilient communities in southern African countries. Although a generalisation cannot be made on the status of contingency planning and practice in southern Africa without a wider analysis of more examples, the findings may apply beyond the examined contexts and also offer insights into research gaps.

  5. 40 CFR 51.152 - Contingency plans.

    Science.gov (United States)

    2010-07-01

    ... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Prevention of Air Pollution Emergency... emission control actions to be taken at each episode stage. (Examples of emission control actions are set...: (1) Prompt acquisition of forecasts of atmospheric stagnation conditions and of updates of such...

  6. National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet

    Science.gov (United States)

    This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.

  7. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  8. Volcanic Eruption: Students Develop a Contingency Plan

    Science.gov (United States)

    Meisinger, Philipp; Wittlich, Christian

    2013-04-01

    , causing a blockage and afflux of the Rhine, which, due to the given conditions of a very narrow valley, would lead to excessive flooding affecting even the greater Rhine-Main-region. Not to mention the consequences of a pyroclastic flow, dropping volcanic bombs and further hazardous/disastrous consequences. In comparison to other "potentially active" or "active volcanoes", e.g. the Vesuvius, the Laacher See is scarcely monitored and according to recent publications poorly analyzed in terms of contingency and evacuation plans. This offers space for critical analysis and creative solutions to an existing problem. Short: We need geographers and their knowledge to provide help. Given these facts, the Laacher See could be the layout for a very interesting geography project bringing together previously gained knowledge and understanding of volcanic activities, their destructive powers, consequences and risks in case of an eruption in combination with their topographical characteristics. Your students thereby act the role of a geoscientist developing contingency plans and evacuation zones for the greater Laacher See area. This involves a detailed analysis of the topographical characteristics based on (classic) topographic maps or online via the use of a GIS (e.g. Google maps). In a second step students enlist the possible consequences they already know according to their range and copy them onto a transparency layer on the topographic map. Using such a layer technique students add population density, important topographic features and maybe even anticipated wind directions to their map. The information density and the specific layout of this map are thereby only determined by the student's previous knowledge, their personal abilities and skills and the amount of time provided. This offers the opportunities to even differentiate the task within your group and provide support adjusted to the individual students level. On the basis of their own thematic map your students should be

  9. 40 CFR 267.54 - When must I amend the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When must I amend the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.54 When must I amend the contingency plan? You must review, and immediately amend the contingency plan, if necessary, whenever: (a) The facility...

  10. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  11. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  12. Dengue Contingency Planning: From Research to Policy and Practice

    Science.gov (United States)

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini

    2016-01-01

    Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak

  13. Public education programme for nuclear contingency planning in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.; Li, S. W.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. Cooperation by the public is vital to the effective implementation of any contingency plan. Understanding of the basics of radiation protection as well as the contingency plan will help the public to appreciate the situation and react in a rational manner. A public education program to promote awareness of the contingency plan has been implemented in Hong Kong. In particular, a Virtual Exhibition Hall on radiation has been developed and launched in February 2002 for access by the public via Internet. A video and a set of web pages will be launched in the later part of 2002 to inform and educate the public on matters related to nuclear accident response in Hong Kong. This paper describes the public education programme in Hong Kong to promote public awareness and understanding of the nuclear contingency plan

  14. Implications of Contingency Planning Support for Weather and Icing Information

    Science.gov (United States)

    Vigeant-Langlois, Laurence; Hansman, R. John, Jr.

    2003-01-01

    A human-centered systems analysis was applied to the adverse aircraft weather encounter problem in order to identify desirable functions of weather and icing information. The importance of contingency planning was identified as emerging from a system safety design methodology as well as from results of other aviation decision-making studies. The relationship between contingency planning support and information on regions clear of adverse weather was investigated in a scenario- based analysis. A rapid prototype example of the key elements in the depiction of icing conditions was developed in a case study, and the implications for the components of the icing information system were articulated.

  15. 40 CFR 267.53 - Who must have copies of the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...

  16. 77 FR 76815 - Handling of Animals; Contingency Plans

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 9 CFR Parts 2 and 3 [Docket No. APHIS-2006-0159] RIN 0579-AC69 Handling of Animals; Contingency Plans AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Final rule. SUMMARY: We are amending the Animal Welfare Act...

  17. The Chalk River Nuclear Laboratories contingency plan -a brief description

    International Nuclear Information System (INIS)

    White, J.M.

    1982-01-01

    A brief description of the contingency plan which deals with both the on-site and off-site consequences of a serious nuclear accident is given. The off-site consequences of different size releases and the subsequent action taken by employees, radiation protection experts, municipal, Provincial and Federal authorities is described and the interaction of the various groups is discussed. (author)

  18. Environmental aspects of contingency planning and spill response

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1993-01-01

    Alyeska Pipeline Service Company has implemented an incident command system (ICS) for crisis management within the company for response to spills at all company facilities including the Valdez Marine Terminal. The system is also used by Alyeska acting as the initial response contractor for TAPS laden tankers within Prince William Sound. During the past three years, Alyeska has undertaken a complete review of the spill prevention and response plans for these areas. This poster session focuses on the environmental aspects of the response planning efforts. Information is available on contingency planning updates in the areas of dispersant use, burning as a response tool, bioremediation of marine oil spills, waste management, permitting, coastal resource and sensitive habitat data base, and wildlife protection and management. All of these subjects are addressed in the resource documents (RD) supplementing the contingency plans. The RD revisions have been a coordinated effort, involving operators, agencies, and the public through the citizen advisory group

  19. Proposed energy conservation contingency plan: emergency restrictions on advertising lighting. Authorities, need, rationale, and operation

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.

  20. Robustness via Run-Time Adaptation of Contingent Plans

    Science.gov (United States)

    Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)

    2000-01-01

    In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

  1. Defense plan of Hydro-Quebec for extreme contingencies

    International Nuclear Information System (INIS)

    Trudel, Guilles; Bernard, Serge; Portales, Esteban

    2000-01-01

    In the last years, Hydro-Quebec it undertook an important program to improve the dependability of their net of energy transport. They concentrated the efforts on increasing the capacity of the net resist in the event of carries to an extreme contingency caused in general by multiple incidents or for successive disconnection of the lines of energy transport. To neutralize these contingencies, Hydro-Quebec it adopted a series of special measures that are contained under the general title of Plan of Defense for Extreme Contingencies. The objective of this plan is to detect the incidents that surpass the capacity of the net. It is completely automatic and it is based mainly in: A system of automatic disconnection of generation and tele-shot of loads; A system of automatic maneuver (opening and closing) of inductances shunt of 735 kw; A system of disconnection of loads for low voltage; A system of disconnection of loads for low frequency. The present document summarizes the orientations that there is taking Hydro-Quebec to protect its net in the event of extreme contingencies and it describes the different automatism that they are adopts, in particular the system automatic disconnection of generation and tele-shot of loads (RPTC) that is one of the main components of the defense plan. The system RPTC detects the simultaneous loss of several lines directly in 15 substations of 735 kw. It understands four places of automatic disconnection of generation and a centralized system of tele-shot of loads

  2. Contingency planning for nuclear emergencies in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. This plan not only aims to ensure a quick and timely response to mitigate the health impact of any accidental release but also targets to re-assure the public that the territory is not contaminated when appropriate. This paper describes the principal elements of the nuclear contingency plan in Hong Kong, namely, an extensive environmental radiation monitoring programme and a proactive public communication programme

  3. Contingency planning for rapid reduction of greenhouse gas emissions

    Directory of Open Access Journals (Sweden)

    Larsson, Nils K.

    2010-03-01

    Full Text Available The current and predicted levels of greenhouse gas (GHG emissions are, according to the best international scientific estimates, leading the world towards climate change that will have serious consequences for all countries. The problem is aggravated by the tendency of people and institutions not to take action until catastrophic consequences emerge. The history of crises in other sectors show us that reactions are likely to focus on ad-hoc reactions or using plans that are readily available, with negative results. However, the alternative of developing public plans for drastic and rapid reductions is not likely to gain support because of their radical nature. The author therefore proposes that large organizations with direct or indirect control over substantial GHG emissions should prepare private contingency plans for very rapid reductions in emissions, so that more rational and less destructive plans will be available when the appropriate moment comes for last-minute action. Examples of the type of specific plans that may be appropriate are suggested.

    Según las estimaciones científicas internacionales más optimistas, los niveles actuales y previstos de emisiones de gases de efecto invernadero (GEI están llevando al mundo hacia un cambio climático que tendrá graves consecuencias para todos los países. El problema se ve agravado por la tendencia de personas e instituciones a no tomar medidas hasta que no se perciben las catastróficas consecuencias. El historial de crisis ocurridas en otros sectores nos demuestra que las reacciones probablemente se centren en medidas ad hoc o en emplear planes que ya existían, pero sin resultados. Sin embargo, es poco probable que la alternativa al desarrollo de planes públicos para las reducciones drásticas y rápidas consiga el apoyo necesario, debido precisamente a su radicalidad. El autor recomienda por tanto que las grandes organizaciones que tengan control directo o indirecto sobre un

  4. 10 CFR 72.186 - Change to physical security and safeguards contingency plans.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Change to physical security and safeguards contingency... contingency plans. (a) The licensee shall make no change that would decrease the safeguards effectiveness of... licensee safeguards contingency plan without prior approval of the Commission. A licensee desiring to make...

  5. 78 FR 53113 - Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency...

    Science.gov (United States)

    2013-08-28

    ...] Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency Measures for... California to address Clean Air Act nonattainment area contingency measure requirements for the 1997 annual... Air Act Requirements for Contingency Measures III. Review of the Submitted San Joaquin Valley PM 2.5...

  6. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  7. 75 FR 33747 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-06-15

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Notice of Intent to Delete the soils of Operable Unit 1 and the underlying ground water of the... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Texas...

  8. 78 FR 16612 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2013-03-18

    ... Hazardous Substances Pollution Contingency Plan (NCP) to broaden the technology, to include computer... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-2012-0738; FRL-9791-4] National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public Availability of the...

  9. 78 FR 73449 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-12-06

    ... Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the soil of 1,154 residential...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Omaha Lead Superfund Site AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...

  10. 76 FR 70105 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial Deletion of the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State... property PINs listed above. The deletion of these two parcels from the Site affects all surface soils...

  11. 76 FR 45483 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Contingency Plan (NCP). The EPA and the State of Texas, through the Texas Commission on Environmental Quality... Notice of Deletion for SMPA Superfund Site without prior Notice of Intent for Deletion because EPA views...

  12. 78 FR 11620 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2013-02-19

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List: Deletion of the Kerr... Substances Pollution Contingency Plan (NCP). EPA and the State of Illinois, through the Illinois... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  13. 78 FR 45905 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-30

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Craig... Substances Pollution Contingency Plan (NCP). The EPA and the Commonwealth of Pennsylvania, through the... Craig Farm Drum Superfund Site without prior Notice of Intent to Delete because we view this as a...

  14. 76 FR 45484 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... PBL Superfund Site without prior Notice of Intent for Deletion because EPA views this as a...

  15. 77 FR 43567 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-07-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Fort... Contingency Plan (NCP). The EPA and the State of New Jersey, through the NJ Department of Environmental... Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse comment...

  16. 78 FR 69360 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-19

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial... and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of California... Corp Air Station Superfund Site without prior Notice of Intent for Partial Deletion because EPA views...

  17. 76 FR 18136 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-04-01

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Norwood... amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... we view this as a noncontroversial revision and anticipate no adverse comment. We have explained our...

  18. 76 FR 50441 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-15

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of New Jersey, through the New Jersey... Deletion of the Sayreville Landfill Superfund Site without prior Notice of Intent to Delete because we view...

  19. 78 FR 48844 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-12

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Mosley... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Oklahoma... Deletion of the MRSL Superfund Site without prior Notice of Intent to Delete because we view this as a...

  20. 76 FR 20605 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2011-04-13

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the Michigan Department... Delete because we view this as a noncontroversial revision and anticipate no adverse comment. We have...

  1. 76 FR 70057 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Partial Deletion of the...). Refer to Figures 1 to 3 in the deletion docket to view the location of the two parcels being proposed... Substances Pollution Contingency Plan (NCP). This direct final partial deletion is being published by EPA...

  2. 75 FR 43115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-23

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent to Partially..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... Intent for Partial Deletion because EPA views this as a noncontroversial revision and anticipates no...

  3. 75 FR 47521 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent...

    Science.gov (United States)

    2010-08-06

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent To Delete the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the... Corporation (Markhams) Superfund Site without prior notice of intent to delete because we view this as a...

  4. 78 FR 47267 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-05

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the State of Oklahoma, through the Oklahoma Department of Environmental... without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  5. 78 FR 66325 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-05

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of South Carolina, through the South... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  6. 78 FR 60809 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of New York, through the New York State... Deletion of the Site without prior Notice of Intent to Delete because EPA views this as a noncontroversial...

  7. 76 FR 51316 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-18

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the Commonwealth of Puerto Rico, through the Puerto Rico Environmental... Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  8. 78 FR 44512 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-24

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Sola... Pollution Contingency Plan (NCP). The EPA and the State of California, through the Regional Water Quality...., Inc. Superfund Site without prior Notice of Intent to Delete because we view this as a...

  9. 76 FR 32115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-06-03

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent To Delete the... Substances Pollution Contingency Plan (NCP). The EPA and the State of Delaware, through the Delaware... Delete because EPA views this as a noncontroversial revision and anticipates no adverse comment. We have...

  10. 76 FR 81904 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-12-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Hipps..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... of Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse...

  11. 75 FR 54821 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent...

    Science.gov (United States)

    2010-09-09

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent for Partial... amended, is an Appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... Superfund Site without prior Notice of Intent for Partial Deletion because EPA views this as a...

  12. 78 FR 45167 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-26

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Cannon... Substances Pollution Contingency Plan (NCP). The EPA and the State of Massachusetts, through the...), Superfund Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision...

  13. 77 FR 67783 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2012-11-14

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the Waste... and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the...-Holland Lagoons Superfund Site without prior Notice of Intent to Delete because we view this as a...

  14. 78 FR 60721 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... final Notice of Deletion of the Ludlow Sand & Gravel Superfund Site (Site), located in the Town of Paris..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...

  15. Genesis Contingency Planning and Mishap Recovery: The Sample Curation View

    Science.gov (United States)

    Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.

    2007-01-01

    Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range

  16. Oil spill contingency planning in the Ivory coast

    International Nuclear Information System (INIS)

    Bender, K.; Jensen, S.K.; Ostergaerd, J.; Nogbou, P.

    1993-01-01

    The administrative center in charge of handling oil spill pollution situations on the Ivory Coast, West Africa, is named Centre Ivoirien Antipollution (CIAPOL). Its organizational structure has been reshuffled recently. CIAPOL now has three divisions: a laboratory division, a division for cleaning up oil and chemical pollution at sea, and an administrative division. The risk for oil pollution is known: within the past ten years five spills have been reported. All of these have been connected to operations relating to the refinery in Abidjan. More than 2,000 ships call at the port of Abidjan every year. Minor oil slicks are found almost permanently in the harbor and the lagoons around the harbor. Lumps of tar are rather common on the beaches all along the country's coast. This paper focuses on the background investigation in sensitive areas and risk analysis that led to a revision of the oil spill contingency plan, Plan Pollumar, and the recent purchase of oil spill cleanup equipment. The creation of a regional oil pollution response center at CIAPOL for all of the countries in West Africa, is proposed

  17. Getting help quickly: older people and community worker perspectives of contingency planning for falls management.

    Science.gov (United States)

    Charlton, Kimberly; Murray, Carolyn M; Kumar, Saravana

    2018-01-01

    Older people living in the community need to plan for getting help quickly if they have a fall. In this paper planning for falls is referred to as contingency planning and is not a falls prevention strategy but rather a falls management strategy. This research explored the perspectives of older people and community workers (CWs) about contingency planning for a fall. Using a qualitative descriptive approach, participants were recruited through a community agency that supports older people. In-depth interviews were conducted with seven older people (67-89 years of age) and a focus group was held with seven workers of mixed disciplines from the same agency. Older people who hadn't fallen were included but were assumed to be at risk of falls because they were in receipt of services. Thematic analysis and concept mapping combined the data from the two participant groups. Four themes including preconceptions about planning ahead for falling, a fall changes perception, giving, and receiving advice about contingency plans and what to do about falling. Both CWs and older people agree contingency planning requires understanding of individual identity and circumstances. CWs have limited knowledge about contingency planning and may be directive, informative, or conservative. Implications for Rehabilitation Falls can result in serious consequences for older people. There is an evidence-practice gap as availability of and access to contingency planning does not necessarily mean older people will use it in a falls emergency. Older people prefer community workers to be directive or informative about contingency planning options but they do want choice and control. Increased community workers knowledge of, and collaborative decision-making about, contingency planning may promote patient-centered services and assist in closing the evidence-practice gap.

  18. Power plant construction lead times: The value of contingency planning

    International Nuclear Information System (INIS)

    Rubin, L.J.

    1985-01-01

    In this paper an analysis of two different approaches to the construction of a major power plant (nuclear) is presented. The analysis compares an accelerated, ''go-for-broke'' strategy-which has some risk of being delayed-with a more deliberate contingency construction schedule in terms of revenue requirements and costs of electricity. It is demonstrated that under a wide variety of circumstances there are important advantages to the contingency strategy, but that the magnitude of those advantages is sensitive to the character of the power system being examined and to the flexibility of the contingency approach

  19. Contingency planning at the flotilla level in the United States Coast Guard Auxiliary: flotilla 81-a case study.

    Science.gov (United States)

    Schooley, Shawn Erik

    2013-01-01

    This article presents a case study of United States Coast Guard Auxiliary Flotilla 81. Flotilla 81 created its first formal, single agency contingency plan. The research question addressed is "How can a flotilla successfully develop a contingency plan?" Five emergent themes are identified. They are offered as suggested promising practices for other flotillas in need of creating a contingency plan. Findings suggest successful contingency planning is a result of effective collaboration with community partners. Network management theory is a key to an effective contingency planning process.

  20. Criteria for selection of fuel cycle and major materials licenses needing radiological contingency plans. Regulatory report

    International Nuclear Information System (INIS)

    Fisher, F.D.

    1981-07-01

    Quantities of NRC-licensed radioisotopes requiring the licensee to develop and submit radiological contingency planning information to the NRC for review and approval are developed and presented as limiting possession limits and conditions of possession

  1. 76 FR 56294 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental relations, Penalties... error in processing the direct- final rule. The online Federal Document Management System (FDMS) did not...

  2. 76 FR 56362 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... protection, Air pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental... processing the deletion notice. The online Federal Document Management System (FDMS) did not include required...

  3. 75 FR 44920 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-30

    ... State Registry of Inactive Hazardous Waste Disposal Sites as a ``Class 2 Inactive Hazardous Waste Site..., Chemicals, Hazardous waste, Hazardous substances, Intergovernmental relations, Natural resources, Oil... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the SMS...

  4. 76 FR 510 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-01-05

    ..., Intergovernmental relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Site is located in Albuquerque, Bernalillo County, New Mexico. After this deletion, this 62 acres will...

  5. 120-D-1 (100-D) Ponds supplemental information to the Hanford Facility Contingency Plan. Revision 2

    International Nuclear Information System (INIS)

    Petersen, S.W.; Zoric, J.P.

    1997-06-01

    This document is a supplement to the Hanford Facility Contingency Plan and provides the unit-specific information needed to fully comply with the Washington Administrative Code 173-303 for contingency plans. The 100-D ponds are unlined surface impoundments that were mainly used to dispose of nondangerous wastewater, The ponds are designated as a single treatment, storage, and/or disposal unit because of potential corrosive characteristics of the wastewater. No waste is currently present at the 100-D Ponds

  6. Reactor operation plan preparing device

    International Nuclear Information System (INIS)

    Sano, Hiroki; Maruyama, Hiromi; Kinoshita, Mitsuo; Fukuzaki, Koji; Banto, Masaru; Fukazawa, Yukihisa.

    1993-01-01

    The device comprises a means for retrieving a control rod pattern capable of satisfying a thermal limit upon aimed power/minimum flow rate and providing minimum xenon and a control rod pattern maximum xenon. It further comprises a means for selecting a control rod pattern corresponding to a xenon equilibrium condition, and selecting a control rod which provides a greater thermal margin to provide a control rod operation sequence for each of the patterns. Further, the device comprises an outline plan preparing means and a correction means therefor, a simplified sequence table reference means operated along with sequence change, an operation limit region input means, a control rod operation preferential region changing means, a thermal margin evaluation region and an input means. This can automatically prepare the operation plan, decrease the times for preparation of detailed plans by using the outline plan preparing function, thereby enabling to remarkably shorten the time for preparing of an operation plan. (N.H.)

  7. 202-S Hexone Facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the 202-S Hexone Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. The 202-S Hexone Facility is not used to process radioactive or nonradioactive hazardous material. Radioactive, dangerous waste material is contained in two underground storage tanks, 276-S-141 and 276-S-142. These tanks do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 202-S Hexone Facility

  8. Unit-specific contingency plan for the 183-H solar evaporation basins. Revision 1

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1996-03-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H solar evaporation basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  9. Unit-specific contingency plan for the 183-H Solar Evaporation Basins. Revision 2

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1997-01-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  10. Unit-Specific Contingency Plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-04-01

    This document is a supplement to DOE/RL-93-75, 'Hanford Contingency Plan.' It provides the unit-specific information needed to fully comply with the Washington Administrative Code. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins were four concrete internal surfaces, which contained radiologically and hazardous contaminated waste. The 183-H Basin area is a final status treatment, storage, and disposal unit undergoing Resource Conservation and Recovery Act modified post- closure care

  11. [Scientific basis of environmental health contingency planning for a coastal oil spill].

    Science.gov (United States)

    Kim, Young Min; Cheong, Hae Kwan; Kim, Jong Ho; Kim, Jong Hun; Ko, Kumsook; Ha, Mina

    2009-03-01

    This study presents a scientific basis for the establishment of an environmental health contingency plan for dealing with accidental coastal oil spills and suggests some strategies for use in an environmental health emergency. We reviewed the existing literature, and analyzed the various fundamental factors involved in response strategies for oil spill. Our analysis included data derived from Hebei Spirit oil spill and used air dispersion modeling. Spill amounts of more than 1,000 kl can affect the health of residents along the coast, especially those who belong to vulnerable groups. Almost 30% of South Korean population lives in the vicinity of the coast. The area that is at the highest risk for a spill and that has the greatest number of people at risk is the stretch of coastline from Busan to Tongyeong. The most prevalent types of oil spilt in Korean waters have been crude oil and bunker-C oil, both of which have relatively high specific gravity and contain volatile organic compounds, polycyclic aromatic hydrocarbons, and metals. In the case of a spill of more than 1,000 kl, it may be necessary to evacuate vulnerable and sensitive groups. The government should establish environmental health planning that considers the spill amount, the types of oil, and the distance between the spot of the accident and the coast, and should assemble a response team that includes environmental health specialists to prepare for the future oil spill.

  12. A guide to contingency planning for oil spills on water. V. 2

    International Nuclear Information System (INIS)

    1997-01-01

    The movement of oil from the dominant production centres of the world to the world-wide market is primarily achieved by the use of tankers and pipelines. The global pattern of marine transport is well established as shown in Figure 1, below. While the environmental priority for all tanker operations is the prevention of spills, it is recognized that marine spills are a factor for which management must plan. This report, which is prepared for those managements in industry and government, describes the elements of the contingency planning process. It stresses the importance of cooperative activity between industry and government. It presents a consensus view of the IPIECA membership which is representative of the international oil industry. It reflects current informed thinking in the light of the extensive individual company and industry organization reviews that have taken place since the Exxon Valdez and other major incidents in 1989/90. This report has drawn freely on many of these reviews, some of which have been published. (UK)

  13. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...

  14. Application of Planned Behavior Theory to Account for College Students' Occupational Intentions in Contingent Employment

    Science.gov (United States)

    Huang, Jie-Tsuen

    2011-01-01

    The purpose of this study was to apply Ajzen's (1991) theory of planned behavior to examine college students' intentions to engage in contingent employment. Data were collected from 845 students in 8 colleges and universities in Taiwan. The results of structural equation modeling analyses indicated that both attitude and subjective norms were…

  15. 76 FR 11350 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-03-02

    ..., Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Dated: February... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Mexico, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the...

  16. 75 FR 55479 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-09-13

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... . SUPPLEMENTARY INFORMATION: The portion of the site to be deleted from the NPL is the surface media (soil... further actions. List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control...

  17. 77 FR 31215 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-05-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... the surface soil, unsaturated subsurface soil, surface water and sediments of Operable Unit (OU) 1...: The Environmental Protection Agency (EPA) Region 8 announces the deletion of Operable Unit (OU) 1--the...

  18. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    Science.gov (United States)

    2012-05-22

    common PREREQ 1 Walkable Streets yes Planning, Desi gn, Construction, OaM Medium use areas. Plan careft,j!y to accommodate simftar functions in the...apjly the specific LEED·ND criteria. Pay special attention to roads that connect LSA ~ife support areas) to common Walkable Streets yes Planning... Walkable Streets  Intent: ►To promote transportation efficiency. ►To promote walking by providing: • Safe •Appealing •Comfortable street

  19. Real-time laboratory exercises to test contingency plans for classical swine fever: experiences from two national laboratories.

    Science.gov (United States)

    Koenen, F; Uttenthal, A; Meindl-Böhmer, A

    2007-12-01

    In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning contingency plans. These plans should ensure that in the event of an outbreak access to facilities, equipment, resources, trained personnel, and all other facilities needed for the rapid and efficient eradication of the outbreak is guaranteed, and that the procedures to follow are well rehearsed. It is essential that these plans are established during 'peace-time' and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance of a well-documented laboratory contingency plan. The major pitfalls encountered were shortage of space, difficulties in guaranteeing biosecurity and sufficient supplies of sterile equipment and consumables. The need for a standardised laboratory information management system, that is used by all those involved in order to reduce the administrative load, is also discussed.

  20. 40 CFR 264.52 - Content of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... to air, soil, or surface water at the facility. (b) If the owner or operator has already prepared a... control equipment, communications and alarm systems (internal and external), and decontamination equipment...

  1. Thinking ahead about reproductive health: contingency planning and emergency preparedness in crisis situations (Iraq and West Africa).

    Science.gov (United States)

    DeLargy, Pamela; Alakbarov, Ramiz

    2004-09-01

    The United Nations Population Fund (UNFPA) coordinated efforts to integrate RH into contingency planning for the 2003 Iraq crisis and the 2003 regional response for displaced populations in West Africa. Using UNFPA's network of country offices in the Middle East, staff developed logistics plans, conducted workshops and pre-positioned RH supplies. Though refugee movements did not occur, the contingency planning enhanced the response capacity of UNFPA offices and made it possible to rapidly provide assistance inside Iraq. In West Africa, multi-country workshops and follow-up resulted in country-level and regional action plans useful during the renewed crises of 2003; scarce funding, however, limited their full implementation. UNFPA's experiences show that contingency planning requires committing resources for crises, some of which will not occur; new staff skills; and follow-up. Moreover, RH is considered by some to be additional to the core elements of contingency planning. RH's political sensitivity, particularly with certain donors, further complicated integrated planning.

  2. The management of acute risks. Oil spill contingency planning and response

    International Nuclear Information System (INIS)

    Monk, D.C.; Cormack, D.

    1992-01-01

    It is clear that the risks of environmental damage can be best minimized by preventing oil spills from occurring at all. Since absolute prevention is unrealistic, however, early detection is essential and aerial surveillance techniques are of great value in this connection. If spills do occur, proper contingency planning and clean-up techniques can minimize impacts, but will rarely avoid them completely if the spilled oil reaches the coastline. It is evident that a main priority should be to prevent spilled oil reaching the coastline. The way in which oil spill response strategy is implemented is discussed in detail. It is based on four key elements: the allocation of responsibilities; contingency planning; training and exercises; regular audit of plans and response mechanisms. A case study of the oil spill strategy employed at the Sullom Voe oil terminal in Shetland is used as an illustration. (UK)

  3. Contingency plan for the Oak Ridge National Laboratory liquid low-level waste system

    International Nuclear Information System (INIS)

    DePaoli, S.M.; Ferrada, J.J.; Abraham, T.J.; Brown, C.H.; Lin, K.H.

    1989-12-01

    Oak Ridge National Laboratory (ORNL) is one of the major Department of Energy (DOE) facilities that performs various research and development (R ampersand D) activities. Liquid low-level waste (LLLW) is generated in the course of this work. The primary objective of this task is to develop specific plans of action to be implemented, in the event that the storage space for the LLLW concentrate should approach the minimum value in the operational flexibility range or a problem should develop concerning storage space available for dilute LLLW. This report considers contingency plans/options in the light of six different scenarios, including ''normal operation'' and five others. Evaluation and prioritization of the options were carried out separately for each case. Brief discussions of these scenarios and contingency plans/options are presented. 20 refs., 14 figs., 14 tabs

  4. Disaster and Contingency Planning for Scientific Shared Resource Cores.

    Science.gov (United States)

    Mische, Sheenah; Wilkerson, Amy

    2016-04-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy.

  5. Disaster and Contingency Planning for Scientific Shared Resource Cores

    Science.gov (United States)

    Wilkerson, Amy

    2016-01-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  6. A methodology to assist in contingency planning for protection of nuclear power plants against land vehicle bombs

    International Nuclear Information System (INIS)

    James, J.W.; Goldman, L.A.; Lobner, P.R.; Finn, S.P.; Koch, T.H.; Veatch, J.D.

    1989-04-01

    This report provides a methodology which could be used by operators of licensed nuclear power reactors to address issues related to contingency planning for a land vehicle bomb, should such a threat arise. The methodology presented in this report provides a structured framework for understanding factors to be considered in contingency planning for a land vehicle bomb including: (1) system options available to maintain a safe condition, (2) associated components and equipment, (3) preferred system options for establishing and maintaining a safe shutdown condition, and (4) contingency measures to preserve the preferred system options. Example applications of the methodology for a Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) are provided along with an example of contingency plan changes necessary for implementation of this methodology, a discussion of some contingency measures that can be used to limit land vehicle access, and a bibliography. 2 refs., 11 figs., 6 tabs

  7. Y2K compliance readiness and contingency planning.

    Science.gov (United States)

    Stahl, S; Cohan, D

    1999-09-01

    As the millennium approaches, discussion of "Y2K compliance" will shift to discussion of "Y2K readiness." While "compliance" focuses on the technological functioning of one's own computers, "readiness" focuses on the operational planning required in a world of interdependence, in which the functionality of one's own computers is only part of the story. "Readiness" includes the ability to cope with potential Y2K failures of vendors, suppliers, staff, banks, utility companies, and others. Administrators must apply their traditional skills of analysis, inquiry and diligence to the manifold imaginable challenges which Y2K will thrust upon their facilities. The SPICE template can be used as a systematic tool to guide planning for this historic event.

  8. Contingency plans for the ISEE-3 libration-point mission

    Science.gov (United States)

    Dunham, D. W.

    1979-01-01

    During the planning stage of the International Sun-Earth Explorer-3 (ISEE-3) mission, a recovery strategy was developed in case the Delta rocket underperformed during the launch phase. If a large underburn had occurred, the ISEE-3 spacecraft would have been allowed to complete one revolution of its highly elliptical earth orbit. The recovery plan called for a maneuver near perigee to increase the energy of the off-nominal orbit; a relatively small second maneuver would then insert the spacecraft into a new transfer trajectory toward the desired halo orbit target, and a third maneuver would place the spacecraft in the halo orbit. Results of the study showed that a large range of underburns could be corrected for a total nominal velocity deviation cost within the ISEE-3 fuel budget.

  9. The Peoples Liberation Army and Contingency Planning in China

    Science.gov (United States)

    2015-01-01

    protests; blocking traffic; or large-scale gatherings involving sporting events, commercial activities, or entertainment . During such events, the...holding large-scale exhibi- tions and cultural, sports , or other events. Recent examples where such plans appear to have been in place include the...pollution, and damage to the environment • public health incidents, which include epidemics, food safety and occu- pational hazards, animal diseases, and

  10. Standby Gasoline Rationing Plan. Contingency gasoline rationing regulations

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The Economic Regulatory Administration issues final rules with respect to standby gasoline rationing. The plan is designed for and would be used only in the event of a severe gasoline shortage. The plan provides that eligibility for ration allotments will be primarily on the basis of motor vehicle registrations. DOE will mail government ration checks to the parties named in a national vehicle registration file to be maintained by DOE. Ration recipients may cash these checks for ration coupons at various designated coupon issuance points. Retail outlets and other suppliers will be required to redeem the ration coupons received in exchange for gasoline sold. Supplemental gas will be given to high-priority activities. A ration banking system will be established with two separate and distinct of ration accounts: retail outlets and other suppliers will open redemption accounts for the deposit of redeemed ration rights; and individuals or firms may open ration rights accounts, which will operate in much the same manner as monetary checking accounts. A white market will be permitted for the sale of transfer of ration rights. A percentage of the total ration rights to be issued will be reserved for distribution to the states as a State Ration Reserve, to be used by the states primarily for the relief of hardship. A National Ration Reserave will also be established. All sections of the Standby Gasoline Rationing Regulations are analyzed. (MCW)

  11. Sweden; Financial Sector Assessment Program Update: Technical Note on Contingency Planning, Crisis Management and Bank Resolution

    OpenAIRE

    International Monetary Fund

    2011-01-01

    This abstract reviews the recommendations made in the FSAP Update for Sweden in the areas of contingency planning, crisis management, and bank resolution. Although Sweden crisis management fared well during the global financial crisis, its authorities are reviewing the framework for managing financial crises to incorporate crisis lessons. They recommend a domestic institutional framework, an effective cross-border cooperation, an emergency liquidity assistance (ELA), a deposit guarantee schem...

  12. Oil spill contingency planning for offshore oil fields - a new concept established for the Norwegian continental shelf

    International Nuclear Information System (INIS)

    Singsaas, I.; Reed, M.; Nygaard, T.; Sundnes, G.Jr.

    1998-01-01

    The development of a new concept for oil spill contingency planning to be used for offshore oil fields on the Norwegian continental shelf was discussed. The factors which are important in developing a good oil spill contingency plan include a good understanding of: (1) the fate, behaviour and weathering of the specific oil, (2) relevant oil spill scenarios, (3) drift and spreading of the oil, and (4) specific requirements for the effectiveness of the chosen response options. The oil spill contingency and response (OSCAR) model was used for quantitative comparison of alternative response options. 21 refs., 2 tabs., 7 figs

  13. 190-C Facility <90 Day Storage Pad supplemental information to the Hanford facility contingency plan

    International Nuclear Information System (INIS)

    Little, N.C.

    1996-12-01

    The 190-C Facility <90 Day Storage Pad stores waste oils primarily contaminated with lead generated while draining equipment within the building of residual lubricating oils. Waste oils are packaged and stored in fifty-five gallon drums, or other containers permitted by the Site Specific Waste Management Instruction. Bechtel Hanford, Inc. (BHI) manual BHI-EE-02, Environmental Requirements Procedures, references this document. This document is to be used to demonstrate compliance with the contingency plan requirements in Washington Administrative Code, Chapter 173-303, Dangerous Waste Regulations, for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units (units). Refer to BHI-EE-02, for additional information

  14. Proposed energy conservation contingency plan: emergency restrictions on illuminated advertising and certain gas lighting. Economic impact analysis. Environmental impact assessment. Contingency plan No. 5

    Energy Technology Data Exchange (ETDEWEB)

    1976-09-01

    In the event of a severe energy supply disruption or in order to fulfill obligations of the U.S. under the International Energy Program, the President may implement one or more energy conservation contingency plans provided for in the Energy Policy and Conservation Act (EPCA) of 1975. This report describes the economic impact of restrictions on the use of illuminated advertising and certain gas lighting. The proposed plan would reduce demand for electricity and natural gas. The reduced demand for electricity would result in reduced demand for oil, natural gas, and other fuels used to generate electricity. Since oil and natural gas would be in short supply, the reduced use of these fuels in the generation of electricity could make supplies available to other industries. By contrast, the coal supply would not be affected by these conditions. However, the substitutability of coal for fuels in short supply (especially oil for electric generation) would tend to offset the impact of reduced demand for coal to generate electricity. Advertising expenditures would shift. Expenditures for illuminated outdoor signs would fall and expenditures for advertising in other media (e.g., radio, newspapers) would rise. No significant effect upon aggregate retail sales is anticipated. In summary, microeconomic effects of the measure are negligible and all effects are minor and/or beneficial. These effects are almost lost in the projected economic effects that would result from any severe supply interruption.

  15. Australian contingency plans for emergency animal disease control: the role of antigen/vaccine banks.

    Science.gov (United States)

    Tweddle, N E

    2004-01-01

    Vaccination is an important element of contingency plans for many animal diseases. The decision whether or not to use vaccine is complex, and must consider epidemiological, economic and social issues. Vaccines are rarely available in a country for emergency animal diseases unless a low pathogenicity strain of the agent is present or it is localised in carrier hosts. High quality commercial vaccine from overseas is often the preferred source of vaccine in an emergency, although less reliable sources may be used with additional safeguards. Alternatively, master seeds may be imported or developed for production within the country For contingency planning, diseases may be ranked according to the expected role of vaccine in the disease eradication strategy, with diseases for which vaccine is part of the initial response strategy receiving highest priority for action. A range of preparedness options is available, ranging from identifying producers of vaccine, obtaining permits for import and use from regulatory authorities, to establishing vaccine or antigen banks. Countries need to consider their individual situations and develop strategies to address the diseases of significance to them.

  16. 77 FR 30266 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford...

    Science.gov (United States)

    2012-05-22

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2012. Under the William D. Ford Federal Direct Loan...

  17. 77 FR 20796 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford...

    Science.gov (United States)

    2012-04-06

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2011. Under the William D. Ford Federal Direct Loan...

  18. A High Performance System With Explicit Incorporation of ATC Regulations to Generate Contingency Plans for UAVs with Lost Communication, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose a comprehensive and systematic contingency plan generation framework to deal with lost communication in UAVs. ATC regulations are explicitly incorporated...

  19. Contingency planning for oil spill response: A program of joint IMO/oil industry regional seminars

    International Nuclear Information System (INIS)

    Bavister, R.; Wonham, J.

    1993-01-01

    Cooperative efforts between the oil industry and governments at the national and local levels have resulted in a series of reports for both technical and general audiences on subjects relating to oil spills, as well as an ongoing series of government/industry regional seminars for senior executives. The seminars emphasize the crucial importance of joint government/industry attention to contingency planning. These activities, which are continuing, are organized under the auspices of an International Petroleum Industry Environmental Conservation Association working group, and the International Maritime Organization. Feedback is solicited from seminar participants for use in planning further seminars and to give the IMO a clear picture of follow up activities that have resulted from the seminars

  20. Contingency plan for the Lawrence Livermore National Laboratory, Site 300, hazardous waste operations

    International Nuclear Information System (INIS)

    Gonzalez, M.A.

    1983-01-01

    This contingency plan for hazardous waste release provides guidance for coordinating response efforts. With a goal to minimize hazards to human health and life; and protect livestock, wildlife, the environment, and property in the event of a fire, explosion, or any unplanned release of hazardous substances or mixtures to the air, water, or soil. In this document, hazardous waste includes all waste substances or mixtures that: contain any of the hazardous substances listed in the Resource Conservation and Recovery Act; have the characteristic of being toxic, flammable, reactive, corrosive, an irritant, and/or a strong sensitizer; are radioactive and are used in experiments at Site 300; or could have a significant effect on the environment. This Plan includes an overview of emergency response capabilities; and responsibilities assigned to both LLNL and non-LLNL emergency response personel

  1. Contingency plan for deployment of the void fraction instrument in Tank 241-AY-102

    International Nuclear Information System (INIS)

    CONNER, J.M.

    1999-01-01

    High-heat producing sludge from tank 241-C-106 will be sluiced and transferred to tank 241-AY-102 beginning in October 1998. Safety analyses have postulated that after retrieval, the waste in 241-AY-102 may generate and retain unsafe levels of flammable gases (Noorani 1998, Pasamebmetoglu etal. 1997). Unsafe levels of retained gas are not expected, but cannot be ruled out because of the large uncertainty in the gas generation and retention rates. The Tank Waste Remediation System Basis for Interim Operation (Noorani 1998) identifies the need for a contingency plan to add void fraction monitoring to tank 241-AY-102 within 2 weeks of the identification of flammable gas buildup that would warrant monitoring. The Tank 241-C-106 Waste Retrieval Sluicing System Process Control Plan (Carothers et al. 1998) committed to providing a contingency plan for deployment of the void fraction instrument (VFI) in tank 241-AY-102. The VFI determines the local void fraction of the waste by compressing a waste sample captured in a gas-tight test chamber. The sample chamber is mounted on the end of a 76-cm (2.5-ft) arm that can be rotated from vertical to horizontal when the instrument is deployed. Once in the waste, the arm can be positioned horizontally and rotated to sample in different areas below the riser. The VFI is deployed using a crane. The VFI has been deployed previously in 241-AW, 241-AN, and 241-SY tank farms, most recently in tank 241-SY-101 in June and July 1998. An additional test in tank 241-SY-101 is planned in September 1998. Operating instructions for the VFI are included in the Void Fraction Instrument Operation and Maintenance Manual (Pearce 1994)

  2. State-of-the-art risk-based approach to spill contingency planning and risk management

    International Nuclear Information System (INIS)

    Schmidt Etkin, Dagmar; Reilly, Timothy; French McCay, Deborah

    2011-01-01

    The paper proposes incorporating a comprehensive examination of spill risk into risk management and contingency planning, and applying state-of-the-art modeling tools to evaluate various alternatives for appropriate spill response measures and optimize protective responses. The approach allows spill contingency planners and decision-makers to determine the types of spill scenarios that may occur in a particular location or from a particular source and calculate the probability distribution of the various scenarios. The spill probability information is useful in assessing and putting into perspective the various costs options for spill control systems that will be recommended ultimately. Using advanced modeling tools helps in estimating the potential environmental and socioeconomic consequences of each spill scenario based on location-specific factors over a range of stochastic possibilities, simulating spill scenarios and determining optimal responses and protection strategies. The benefits and costs of various response alternatives and variations in response time can be calculated and modeling tools for training and risk allocation/transfer purposes used.

  3. 76 FR 51266 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-18

    ... which was selected in the ROD. The SDs hired M&S Ingenieria y Ciencia Asociados who prepared remedial... approved the Remedial Action Work Plan and M&S Ingenieria y Ciencia Asociados as the Settling Defendants...

  4. Effective communications system for a national oil spill contingency plan in Nigeria

    International Nuclear Information System (INIS)

    Adeyemi-Wilson, O.A.

    1991-01-01

    This paper describes what constitute an Effective Communications System for a National Oil Spill Contingency Plan. It discusses the system available in Nigeria for the oil exploration and producing companies, the Nigerian National Petroleum Corporation (NNPC) and the only oil spill response cooperative, the Clean Nigeria Associates (CNA). The Emergency Communications System which the companies had in place for some time, but is no longer functioning because of bureaucratic problems, is mentioned. The paper also mentioned the need to integrate the various separate systems already in use to provide effective communication for proper oil spill response. It recognizes the need for support from the Ministry of Communications and the two government agencies, NITEL and NET which provide telephone services in Nigeria. A proposed Effective Communications System for Nigeria is described

  5. 78 FR 33395 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013-William D. Ford...

    Science.gov (United States)

    2013-06-04

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013--William D. Ford Federal Direct Loan Program Catalog of Federal Domestic Assistance (CFDA) Number... free, at 1- 800-877-8339. SUPPLEMENTARY INFORMATION: Under the William D. Ford Federal Direct Loan...

  6. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Paulo Roberto Werneck de, E-mail: paulo@pwerneck.com [Universidade Federal Fluminense (UFF), Angra dos Reis, RJ (Brazil); Hora, Antonio Ferreira da, E-mail: dahora@vm.uff.br [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2015-07-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  7. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    International Nuclear Information System (INIS)

    Carvalho, Paulo Roberto Werneck de; Hora, Antonio Ferreira da

    2015-01-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  8. Analysis of the Contingency Contracting Support Plan within the Joint Planning Process Framework

    National Research Council Canada - National Science Library

    Anderson, Michael

    2003-01-01

    ...) flexibility and responsiveness. Current OPLANS at the Joint-level generally discuss how forces will be contractually supported in-theater, but are not specific enough within the framework of the Joint Planning Process (JPP...

  9. Contingency plan improvement for managing oil spills in the coastal waters of Thailand.

    Science.gov (United States)

    Singkran, Nuanchan

    2014-12-15

    The estimated risks of being impacted by oil spills in the coastal waters were used to improve the oil spill contingency plan of Thailand. Functional roles of local agencies are integrated into the plan. Intensive measures are suggested for the coastal provinces located in high-very high risk zones, whereas light and moderate measures are suggested for the coastal provinces located in low and moderate risk zones, respectively. The estimated percentage risks due to simulated oil slicks hitting the coast and/or important resources (PRoilspill) were used to guide the year-round water activities that should be carefully handled at a certain radius with a low-moderate PRoilspill, whereas they should be avoided at a certain radius with a high-very high PRoilspill. Important measures before, during, and post periods of an oil spill incident are suggested to prevent and monitor oil spill incidents and mitigate their impacts on the environment. Copyright © 2014 Elsevier Ltd. All rights reserved.

  10. Contingency planning for electronic health record-based care continuity: a survey of recommended practices.

    Science.gov (United States)

    Sittig, Dean F; Gonzalez, Daniel; Singh, Hardeep

    2014-11-01

    Reliable health information technology (HIT) in general, and electronic health record systems (EHRs) in particular are essential to a high-performing healthcare system. When the availability of EHRs are disrupted, alternative methods must be used to maintain the continuity of healthcare. We developed a survey to assess institutional practices to handle situations when EHRs were unavailable for use (downtime preparedness). We used literature reviews and expert opinion to develop items that assessed the implementation of potentially useful practices. We administered the survey to U.S.-based healthcare institutions that were members of a professional organization that focused on collaboration and sharing of HIT-related best practices among its members. All members were large integrated health systems. We received responses from 50 of the 59 (84%) member institutions. Nearly all (96%) institutions reported at least one unplanned downtime (of any length) in the last 3 years and 70% had at least one unplanned downtime greater than 8h in the last 3 years. Three institutions reported that one or more patients were injured as a result of either a planned or unplanned downtime. The majority of institutions (70-85%) had implemented a portion of the useful practices we identified, but very few practices were followed by all organizations. Unexpected downtimes related to EHRs appear to be fairly common among institutions in our survey. Most institutions had only partially implemented comprehensive contingency plans to maintain safe and effective healthcare during unexpected EHRs downtimes. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  11. ANALISIS SENSITIVITAS LINGKUNGAN OSCP (OIL SPILL CONTINGENCY PLAN DI PESISIR SELATAN DELTA MAHAKAM, PROVINSI KALIMANTAN TIMUR

    Directory of Open Access Journals (Sweden)

    Mursalin Mursalin

    2014-07-01

    Full Text Available The research was one part of oil spill contingency plan (OSCP developed for Delta Mahakam area, where oil & gas exploration and exploitation linked with rich biodiversity supporting coastal community livelihood. Environmental sensitivity  analysis for OSCP only do two early stages of OSCP scope, which integrated with the dangers of coastal vulnerability. This analysis mapped environmental component from oil pollution become sensitivity rangking as an effort to support response development strategies and priorities for the coastal resources protection. The aims of this research were (1 to establish environment sensitivity rank and (2 to identify primary factor supporting the environmental sensitivity for OSCP in south Delta Mahakam area. The result of analysis showed environmenal sensitivity was 62.37% (517.52 km, its mean very high sensitivity. Then the high sensitivity criteria was 11.31% (94 km. The criteria of medium sensitivity was 11.92% (99 km. While for low sensitivity and very low sensitivity respectively were 1.78% (15 km and 12.64% (105 km. Based on Principal Component Analysis (PCA, 36.01%  variability was explained by axis of factor 1. The others variability 18.53% and 13.93% were explained by axis of the factor 2 and factor 3. Axis of factor 1 for coastal exposure (EK, oil residence index (OR, coastal type (TP, and biological resources (SH had a quite large linear combinations coefficient, amounted to 0.94 (EK&OR, 0.83 (TP and 0.75 (SH. This indicated a very high contribution for environmental sensitivity OSCP level drafting. On axis of factor 2, the linear coeffisien combinations for the resource utilization of port (PL was 0.83 and settlement (PM was 0.85. Axis of factor 3 contributed 0.75 and 0.66 on migas platform (PO and placement of passive fishing gear/catchment area (AT. However, the utilization of coastal resources for PL, PM, PO and AT were on axis of factor 2 and factor 3 had a considerable distance with its SI variable

  12. Neither snow nor rain: contingency planning by a clinical reference laboratory courier service for weather related emergencies.

    Science.gov (United States)

    Bankson, Daniel D; Heim, Joseph A

    2014-01-01

    To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).

  13. 216-A-29 Ditch supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-29 Ditch and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-29 Ditch is a surface impoundment that received nonregulated process and cooling water and other dangerous wastes primarily from operations of the Plutonium/Uranium Extraction Plant. Active between 1955 and 1991, the ditch has been physically isolated and will be closed. Because it is no longer receiving discharges, waste management activities are no longer required at the unit. The ditch does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-A-29 Ditch

  14. 216-U-12 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-U-12 Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-U-12 Crib is a landfill that received waste from the 291-U-1 Stack, 244-WR Vault, 244-U via tank C-5, and the UO 3 Plant. The crib pipeline was cut and permanently capped in 1988, and the crib has been backfilled. The unit will be closed under final facility standards. Waste management activities are no longer required at the unit. The crib does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-U-12 Crib

  15. 216-A-36B Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-36B Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-36B Crib is a landfill that received ammonia scrubber waste from the 202-A Building (Plutonium/Uranium Extraction Plant) between 1966 and 1972. In 1982, the unit was reactivated to receive additional waste from Plutonium/Uranium Extraction operations. Discharges ceased in 1987, and the crib will be closed under final facility standards. Because the crib is not receiving discharges, waste management activities are no longer required. The crib does not present a significant hazard to adjacent units, personnel, or the environment. There is little likelihood that any incidents presenting hazards to public health or the environment would occur at the 216-A-36B Crib

  16. Nonradioactive Dangerous Waste Landfill supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the Nonradioactive Dangerous Waste Landfill and is intended to be used as a supplement to DOE/RL-93-75, 'Hanford Facility Contingency Plan.' This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173-303 for certain Resource, Conservation and Recovery Act of 1976 waste management units. The Nonradioactive Dangerous Waste Landfill (located approximately 3.5 miles southeast of the 200 East Area at the Hanford Site) was used for disposal of nonradioactive dangerous waste from January 1975 to May 1985. Currently, there are no dangerous waste streams disposed in the Nonradioactive Dangerous Waste Landfill. Dangerous waste management activities are no longer required at the landfill. The landfill does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that incidents presenting hazards to public health or the environment would occur at the Nonradioactive Dangerous Waste Landfill

  17. 105-DR Large Sodium Fire Facility Supplemental Information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-05-01

    This document is a unit-specific contingency plan for the 105-DR Large Sodium Fire Facility and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of Washington Administrative Code (WAC) 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units.The LSFF occupied the former ventilation supply fan room and was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires. The unit was used to conduct experiments for studying the behavior of molten alkali metals and alkali metal fires. This unit had also been used for the storage and treatment of alkali metal dangerous waste. Additionally, the Fusion Safety Support Studies programs sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium-lead compounds. The LSFF, which is a RCRA site, was partially clean closed in 1995 and is documented in 'Transfer of the 105-DR Large Sodium Fire Facility to Bechtel Hanford, Inc.' (BHI 1998). In summary, the 105-DR supply fan room (1720-DR) has been demolished, and a majority of the surrounding soils were clean-closed. The 117-DR Filter Building, 116-DR Exhaust Stack, 119- DR Sampling Building, and associated ducting/tunnels were not covered under this closure

  18. Contingency plans and successful response strategies for oil spills into rivers

    Energy Technology Data Exchange (ETDEWEB)

    Owens, Edward H. [Polaris Applied Sciences Inc., Bainbridge Island, WA (United States)]. E-mail: ehowens@polarisappliedsciences.com

    2003-07-01

    Oil spilled into a river enters a dynamic environment. An effective response can only succeed if the dynamics of the river system are understood and if the strategies and tactics are designed to match these conditions. Oil is transported downstream at the speed of the current, therefore, an estimate of the rate of movement is essential to identify effective intercept locations. Boom performance is affected by local surface water velocities as entrainment of oil typically begins when velocities exceed 0.4 m/s. However, boom configurations can be effective in current velocities as great as 2.5 m/s. Response operations can be successful if staging or control locations have been identified as part of contingency planning and if booms are deployed to take into account local surface current characteristics. Tracking and control of submerged or sunken oil is difficult and may not be practical. Recovery operations for sunken oil depend on the channel depth, current velocities, and on the distribution and concentration of the oil. (author)

  19. Using contingent choice methods to assess consumer preferences about health plan design.

    Science.gov (United States)

    Marquis, M Susan; Buntin, Melinda Beeuwkes; Kapur, Kanika; Yegian, Jill M

    2005-01-01

    American insurers are designing products to contain health care costs by making consumers financially responsible for their choices. Little is known about how consumers will view these new designs. Our objective is to examine consumer preferences for selected benefit designs. We used the contingent choice method to assess willingness to pay for six health plan attributes. Our sample included subscribers to individual health insurance products in California, US. We used fitted logistic regression models to explore how preferences for the more generous attributes varied with the additional premium and with the characteristics of the subscriber. High quality was the most highly valued attribute based on the amounts consumers report they are willing to pay. They were also willing to pay substantial monthly premiums to reduce their overall financial risk. Individuals in lower health were willing to pay more to reduce their financial risk than individuals in better health. Consumers may prefer tiered-benefit designs to those that involve overall increases in cost sharing. More consumer information is needed to help consumers better evaluate the costs and benefits of their insurance choices.

  20. A new wave-current online information system for oil spill contingency planning (WAVCIS)

    International Nuclear Information System (INIS)

    Stone, G.W.

    2001-01-01

    A Wave Current Information System (WAVCIS) for coastal Louisiana was presented. WAVCIS is an online oceanographic and meteorological observing system that provides many benefits to oil spill contingency planning. The system provides wave information such as wave height, period, direction of propagation, water level, surge, water column velocity profiles and meteorological conditions on a near real time basis. The information is gathered from several stations along Louisiana's coast in the Gulf of Mexico and is transmitted via cellular satellite telephone to a base station at Louisiana State University where it is then made available on the Internet. The database provides information regarding emergency response decision tools for agencies faced with decision making during storm threats or during coordination of an oil spill response operation. It also provides information needed for assisting operations support for offshore industries, commerce and trade. In addition, it can be used to obtain input boundary conditions for numerical modelling of surface and underwater oil and gas or mixtures of oil and gas. It was concluded that WAVCIS provides several benefits, including better cursory assessment of oil spill migration, precision numerical modeling of casts for oil spill trajectories, an important archived data set to assess trajectory modeling, and real-time environmental conditions for vessel operators using dispersants and in situ burning methods. 3 refs., 17 figs

  1. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  2. Resource Estimations in Contingency Planning for Foot-and-Mouth Disease

    Directory of Open Access Journals (Sweden)

    Anette Boklund

    2017-05-01

    Full Text Available Preparedness planning for a veterinary crisis is important to be fast and effective in the eradication of disease. For countries with a large export of animals and animal products, each extra day in an epidemic will cost millions of Euros due to the closure of export markets. This is important for the Danish husbandry industry, especially the swine industry, which had an export of €4.4 billion in 2012. The purposes of this project were to (1 develop an iterative tool with the aim of estimating the resources needed during an outbreak of foot-and-mouth disease (FMD in Denmark, (2 identify areas, which can delay the control of the disease. The tool developed should easily be updated, when knowledge is gained from other veterinary crises or during an outbreak of FMD. The stochastic simulation model DTU-DADS was used to simulate spread of FMD in Denmark. For each task occurring during an epidemic of FMD, the time and personnel needed per herd was estimated by a working group with expertise in contingency and crisis management. By combining this information, an iterative model was created to calculate the needed personnel on a daily basis during the epidemic. The needed personnel was predicted to peak within the first week with a requirement of approximately 123 (65–175 veterinarians, 33 (23–64 technicians, and 36 (26–49 administrative staff on day 2, while the personnel needed in the Danish Emergency Management Agency (responsible for the hygiene barrier and initial cleaning and disinfection of the farm was predicted to be 174 (58–464, mostly recruits. The time needed for surveillance visits was predicted to be the most influential factor in the calculations. Based on results from a stochastic simulation model, it was possible to create an iterative model to estimate the requirements for personnel during an FMD outbreak in Denmark. The model can easily be adjusted, when new information on resources appears from management of other crisis or

  3. 14 CFR 259.4 - Contingency plan for lengthy tarmac delays.

    Science.gov (United States)

    2010-01-01

    ... (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS ENHANCED PROTECTIONS FOR AIRLINE PASSENGERS § 259.4 Contingency..., assurance that the air carrier will provide adequate food and potable water no later than two hours after... flights covered in paragraph (b)(2) of this section, and for the trigger point for food and water covered...

  4. Development of a unified federal/state coastal/inland oil and hazardous substance contingency plan for the state of Alaska

    International Nuclear Information System (INIS)

    Lautenberger, C.; Pearson, L.

    1993-01-01

    Passage of the US Oil Pollution Act (OPA) of 1990 expanded the existing federal planning and response framework in several ways. The OPA created a new requirement for facility and tank vessel response plans and creates an area-level planning and coordination structure to help supplement federal, regional, and local planning efforts. The OPA amended the existing Clean Water Act's section 311(j)(4), which establishes area committees and area contingency plans as primary components of this structure. In 1980, the Alaska legislature enacted legislation which defines the state's policies regarding oil spills. Following the 1989 Exxon Valdez spill, additional legislation was passed to expand and strengthen the state's oil spill program. Specifically, in 1989 the Senate Bill 261 required the Alaska Department of Environmental Conservation to develop, annually review, and revise the State Oil and Hazardous Substance Contingency Plans (State Master and Regional Plans). State regional plans serve as annexes to the State Master Plan. The coordinated and cooperative efforts by government agencies and local entities toward creating a unified federal/state, coastal/inland Oil and Hazardous Substance Contingency Plan are presented, along with the development and progress of unified area/regional contingency plans for Alaska. 3 figs

  5. 216-A-10 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-10 Crib. The Crib is a landfill that received process condensate from the 202-A building Plutonium/Uranium Extraction Plant from 1956 to 1987. The crib has not received waste since March 1987 and will be closed under final facility standards. Waste management activities are no longer required at the crib, and it does not present significant hazard to adjacent units, personnel or the environment. It is unlikely that any incidents presenting hazards to the public health or the environment would occur at the 216-A-10 Crib

  6. 9 CFR 108.3 - Preparation of plot plans.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Preparation of plot plans. 108.3... LICENSED ESTABLISHMENTS § 108.3 Preparation of plot plans. Plot plans shall show all of the buildings on a... on the plot plan the use of immediate adjacent properties such as, residential area, pasture, box...

  7. Contingency planning and risk analysis for water and tailings management at Ranger Uranium Mines

    International Nuclear Information System (INIS)

    McNally, P.E.

    1986-01-01

    This paper describes some of the more likely risks and contingency procedures associated with the extremely variable monsoonal climate of the Alligator Rivers region in the Northern Territory in relation to the Ranger Uranium Mine. The tailings management system is basically a large storage impoundment and a reticulation system that delivers tailings sludge and recycles supernatant water. It is a closed circuit within the water management system and is dealt with as an integral part of that system

  8. The economic value of transportation energy contingency planning: An objective model for analyzing the economics of domestic renewable energy for supply augmentation

    Science.gov (United States)

    Shaten, Richard Jay

    1998-12-01

    Petroleum provides 90% of transportation energy needs. Domestic production is decreasing and global demand is increasing. Risk of escalating prices and supply interruptions are compounded by environmental and military externalities and lost opportunities from the failure to develop alternative domestic resources. Within the context of "energy contingency planning" municipalities should evaluate crisis mitigation strategies. Supply augmentation using domestic renewable fuels is proposed to avert future financial liabilities. A method for calculating the economic value of this strategy is demonstrated. An objective function and associated constraints represent the cost of preparing for each of three possible scenarios: status quo, inflationary and crisis. Constraints ensure that municipal fuel needs are met. Environmental costs may be included. Optimal solutions determine the fuel supply mix for each scenario. A 3 x 3 matrix presents the range of actual costs resulting from preparing for each scenario and subsequent three possible outcomes. The distribution of probabilities of the outcomes is applied to the cost matrix and an "expected value" of preparing for each scenario is calculated. An unanticipated crisis outcome results in. The expected value of the cost of preparing for a crisis is cast as an insurance premium against potential economic liability. Policy makers accept the crisis preparation fuel mix if: (a) they agree with the calculated penalty cost, or (b) they accept the burden of the insurance premium. Green Bay Wisconsin was chosen as a sample municipality. Results show that a perceived 10% chance of crisis requires an annual tax of 4.00 per household to avert economic impacts of 50 million. At a perceived 50% chance of crisis preparing for the crisis would begin to save the municipality money.

  9. Engineering Task Plan for Tank 241-C-106 contingency chiller definitive design

    International Nuclear Information System (INIS)

    Rensink, G.E.; Kriskovich, J.R.

    1995-01-01

    This document identifies the scope, cost, schedule and responsible organizations for completing a design of a contingency ventilation inlet air cooling system for Tank 241-C-106. The air cooling system, described in Rensink (1995), consists of a chiller, cooling coils, and supporting equipment that, when installed will be capable of assuring that the waste temperatures in Tank 241-C-106 are maintained within acceptable limits for safe storage. The effort described herein is scheduled for completion by May 31, 1995 to support Performance Based Incentive (PBI) Milestone SI-2x

  10. Contingency plan for the Old Hydrofracture Facility tanks sluicing project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-10-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), plans to begin a sluicing (flushing) and pumping project to remove the contents from five inactive, underground storage tanks at the Old Hydrofracture Facility (OHF) at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The tank contents will be transferred to the Melton Valley Storage Tanks, which are part of the active waste treatment system at ORNL. The purpose of the project is to minimize the risk of leaking the highly radioactive material to the environment. The five OHF tanks each contain a layer of sludge and a layer of supernatant. Based on a sampling project undertaken in 1995, the sludge in the tanks has been characterized as transuranic and mixed waste and the supernatants have been characterized as mixed waste. The combined radioactivity of the contents of the five tanks is approximately 29,500 Ci. This contingency plan is based on the preliminary design for the project and describes a series of potential accident/release scenarios for the project. It outlines Energy Systems' preliminary plans for prevention, detection, and mitigation. Prevention/detection methods range from using doubly contained pipelines to alarmed sensors and automatic pump cutoff systems. Plans for mitigation range from pumping leaked fluids from the built-in tank drainage systems and cleaning up spilled liquids to personnel evacuation

  11. Visits to Australia by nuclear powered or armed vessels: contingency planning for the accidental release of ionizing radiation

    International Nuclear Information System (INIS)

    1989-01-01

    The report refers to the adequacy of current contingency planning by the Australian Federal and Senate authorities to deal with the accidental release of ionizating radiation from visiting nuclear powered or armed vessels in Australian waters and ports. Much of the material was obtained in response to questions put in writing by the Senate Standing Committee to the Department of Defence, ANSTO and others. In addition, the report contains relevant information from Commonwealth documents as well as the Committee findings and recommendations. Issues considered include: types of visiting nuclear powered vessels, accident likelihood and consequences, differences between naval and land-based reactors, safety records. The persons or organizations who made submissions or appeared in all public hearings are listed in the appendixes, along with all visits to Australian ports by nuclear powered warships from 1976 to 1988

  12. 300 Area Process Trenches Supplemental Information to the Hanford Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    R.A. Carlson

    1997-01-01

    The 300 Area Process Trenches are surface impoundments which were used to receive routine discharges of nonregulated process cooling water from operations in the 300 Area and dangerous waste from several research and development laboratories and the 300 Area Fuels Fabrication process. Discharges to the trenches ceased in 1994, and they were physically isolated in 1995. Remediation of the trenches is scheduled to begin during July 1997. Currently, there are no waste management activities required at the 300 Area Process Trenches and the unit does not present any significant hazards to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 300 Area Process Trenches, however, during remediation, exposure, spill, fire, and industrial hazards will exist. This contingency plan addresses the emergency organization, equipment and evacuation routes pertinent to the process trenches during remediation

  13. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  14. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  15. 78 FR 37741 - Approval and Promulgation of Implementation Plans; California; South Coast; Contingency Measures...

    Science.gov (United States)

    2013-06-24

    ... deliver: Marty Robin, Office of Air Planning (AIR- 2), U.S. Environmental Protection Agency Region 9, 75... INFORMATION CONTACT: Doris Lo, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region 9... statute precludes a State from implementing such measures before they are triggered. See, e.g., LEAN v...

  16. Contingency Contracting within the Department of Defense: A Comparative Analysis

    National Research Council Canada - National Science Library

    McMillion, Chester

    2000-01-01

    .... The thesis compares and contrasts the regulations governing the contingency contracting operations, the organization structure, contingency contracting support plans, and the training requirements...

  17. Hydrologic modeling as a tool for land management and contingency planning in the Calcasieu Sabine Basin. Volume 1

    International Nuclear Information System (INIS)

    Myers, J.; Meselhe, E.; Kheiashy, K.; Miller, R.; Douglas, C.

    2007-01-01

    The Calcasieu-Sabine Basin in southwest Louisiana contains approximately 126,518 hectares of wetlands, consisting of fresh marsh, intermediate marsh, brackish marsh and saline marsh. The hydrodynamics of the basin involves a combination of estuarine processes such as saltwater intrusion, response to water level fluctuations at an open boundary and lake dynamics. The basin is also affected by deep ship channels. As such, a robust, flexible and efficient numerical model is needed to incorporate all of these processes in an operational program. This study developed a hydrodynamic and salinity model for a portion of the basin that includes the lakes and marshes for the purpose of land management and contingency planning. The newly developed finite-difference hydrodynamic and salinity model is a combination of 1 and 2 dimensional computations and is intended for land, wildlife and habitat management. It can be used as a coastal restoration tool to evaluate the effectiveness of future and ongoing coastal restoration projects. The model was calibrated and validated against field measurements. It was shown to produce accurate simulations of the complex flow patterns of the Calcasieu-Sabine Basin along with information on salinity, water level fluctuations, velocities and discharges throughout the main channels and open water bodies within the area. It was concluded that the model provides a very useful planning and adaptive management tool to improve the understanding of the complex hydrology and salinity circulation pattern within the system. 5 refs., 4 tabs., 9 figs

  18. Contingency plan for the Old Hydrofracture Facility Tanks Sluicing Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-06-01

    This revised contingency plan addresses potential scenarios involving the release of radioactively contaminated waste from the Old Hydrofracture Facility Tanks Contents Removal project to the environment. The tanks are located at the Oak Ridge National Laboratory. The project involves sluicing the contents of the five underground tanks to mix the sludge and supernatant layers, and pumping the mixture to the Melton Valley Storage Tanks (MVST) for future processing. The sluicing system to be used for the project consists of a spray nozzle designated the open-quotes Borehole Miner,close quotes with an associated pump; in-tank submersible pumps to transfer tank contents from the sluice tanks to the recycle tank; high-pressure pumps providing slurry circulation and slurry transport to the MVST; piping; a ventilation system; a process water system; an instrumentation and control system centered around a programmable logic controller; a video monitoring system; and auxiliary equipment. The earlier version of this plan, which was developed during the preliminary design phase of the project, identified eight scenarios in which waste from the tanks might be released to the environment as a result of unanticipated equipment failure or an accident (e.g., vehicular accident). One of those scenarios, nuclear criticality, is no longer addressed by this plan because the tank waste will be isotopically diluted before sluicing begins. The other seven scenarios have been combined into three, and a fourth, Borehole Miner Failure, has been added as follows: (1) underground release from the tanks; (2) aboveground release or spill from the sluicing system, a tank riser, or the transfer pipeline; (3) release of unfiltered air through the ventilation system; and (4) Borehole Miner arm retraction failure. Methods for preventing, detecting, and responding to each release scenario are set out in the plan

  19. Temporal contingency

    Science.gov (United States)

    Gallistel, C.R.; Craig, Andrew R.; Shahan, Timothy A.

    2015-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. PMID:23994260

  20. Temporal contingency.

    Science.gov (United States)

    Gallistel, C R; Craig, Andrew R; Shahan, Timothy A

    2014-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. Copyright © 2013 Elsevier B.V. All rights reserved.

  1. Pandemic Planning: Are Universities Really Prepared?

    Science.gov (United States)

    Pokrywka, Francis J.

    2016-01-01

    Planning for a pandemic influenza outbreak at a college or university cannot be done in a vacuum. Like any emergency plan, it needs to be a coordinated effort by a dedicated and unselfish group of individuals at the university pulling together a multitude of people and resources focused on a common goal. There is an ongoing struggle among…

  2. Planning and management for health in periods of economic stringency and instability: a contingency approach.

    Science.gov (United States)

    van der Werff, A

    1986-01-01

    The mid-1970s marked the end of the longest period of uninterrupted economic growth in history, and initiated in Europe--and other parts of the world--a period of economic stagnation and instability. Along with the prosperity explosion of the past, the pattern of health problems has changed and is still changing. Moreover, the demand for health care has kept on rising, without much improvement of health status in general. Thus, there is a critical need to rethink policies, and to ensure that future changes occur within the limits of shrinking resources and the allotted time-span. In particular, the change in priorities envisaged by the Health for All 2000 (HFA 2000) strategies will need to take place against the background of an ageing population, social instability, and continuing development of new lifestyles and persistent economic scarcity. It is by analysing that background that this article seeks to make recommendations as to how health planning and management might successfully cope with the policy reorientation of the HFA 2000 strategy. The structure of this article is as follows. Firstly, the changes taking place in planning conditions will be reviewed, and form the basis of a framework for subsequent analysis of the planning environment. Following this framework, some of the conflicts likely to be faced in planning and management will be discussed, many of which are the consequence of economic stringency and instability. Also the requirements for an improvement of the effectiveness and efficiency of planning will be identified. Finally, a limited number of approaches to planning will be considered, for their appropriateness to the present-day economic circumstances. The point of view elucidated throughout is that there is no single solution which is 'best' under all circumstances. The conclusion, rather, is that the selection of particular theory or method of planning and management should depend both on the objectives of the decision maker and on the

  3. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...accountability and performance, the authors contend that international military organizations will benefit by incorporating Phase Zero Contracting Operations...analytical areas, such as OPLAN analysis , logistics assessments, contracting, and similar professional disciplines. Of note, most organizations do

  4. 75 FR 27464 - Special Reporting, Analysis and Contingent Resolution Plans at Certain Large Insured Depository...

    Science.gov (United States)

    2010-05-17

    ... FDIC is responsible for administering or enforcing. The FDIC also has authority to adopt regulations... strategies, strategies to mitigate systemic risks and overall planning for an orderly resolution in the..., describing means of preserving franchise value, maximizing recovery to creditors, and minimizing systemic...

  5. 241-CX-70, 241-CX-71, and 241-CX-72 underground storage tanks at the strontium semiworks facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the underground storage tanks at the Strontium Semiworks Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. Radioactive material is contained in three underground storage tanks: 241-CX-70, 241-CX-71, and 241-CX-72. Tank 241-CX-70 has been emptied, except for residual quantities of waste, and has been classified as an elementary neutralization tank under the RCRA. Tanks 241-CX-71 and 241-CX-72 contain radioactive and Washington State-only dangerous waste material, but do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the Strontium Semiworks Facility

  6. Risk management and contingency planning for year 2000 - key business decisions for the success of an organization

    International Nuclear Information System (INIS)

    McNeil, J.L.

    1998-01-01

    Factors that transformed Y2K, initially considered as primarily a computer problem, into a business problem are outlined. For example, many organizations have prioritized their inventory of information technology (IT) systems, but few have prioritized their suppliers or customers, or have even thought of what will happen if they cannot get products, or cannot get paid by their customers. Estimates at this time reveal that approximately 30 per cent of businesses will not be operational. This presents a significant risk to any organisation's bottom line. Add to this the status of the world as a whole, where other than about 12 major countries, the majority has not even began to remediate their Y2K problems, and we begin to get a true picture of the potential of major communications problems with subsidiaries, partners or suppliers. Consideration of these factors make it easy to see how Y2K is potentially a major business problem. Because of these risks, it is strongly urged that organizations perform risk management and contingency planning. An example of a risk management approach is presented

  7. Resource Estimations in Contingency Planning for Foot-And-Mouth Disease

    DEFF Research Database (Denmark)

    Boklund, Anette; Sten, Mortensen; Holm Johansen, Maren

    Preparedness planning for a veterinary crisis is important to be fast and effective in the eradication of disease. For countries with a large export of animals and animal products, each extra day in an epidemic will cost millions of euros due to the closure of export markets. This is important....... It was estimated that the need for personnel would peak on day 7 with a requirement of approximately 170 veterinarians, 70 technicians and 45 administrative staff. However, the need for personnel in the Danish Emergency Management Agency (responsible for the hygiene barrier and initial cleaning and disinfection...

  8. Retirement Plan Lawsuits: Preparing for the Storm

    Science.gov (United States)

    Morahan, John; Turner, Aaron

    2017-01-01

    Currently, higher education is being roiled by class-action lawsuits filed against high-profile institutions, including MIT, Yale and New York University, over management of their retirement plans. As the lawyers are deployed and the billable hours accrue, it is timely to examine how those who have responsibility for retirement plan…

  9. Contingency planning and emergency response in construction activities: Training the construction worker

    International Nuclear Information System (INIS)

    Jones, E.

    1987-01-01

    Construction activities have the potential for environmental and/or health impacts at Oak Ridge National Laboratory (ORNL) particularly as site cleanup and restoration plans are initiated. ORNL has instituted special training for all construction workers and related contractors. Individuals learn how construction activities at ORNL can potentially have adverse effects on the environment and their health, and to learn how to respond to potential chemical and radiation hazards. Workers are given a review of basic information on radiation and chemicals in a framework that emphasizes the situations in which workers or the environment may be exposed to potential risk. Specific instructions are presented on what to do when contamination is suspected, with identification of emergency procedures and response personnel. 5 refs., 1 fig

  10. Collective proposal of Contingency Plan as an alternative for management risks to socioenvironmental disasters within Network Management Risk of Córrego Dantas (REGER-CD), Nova Friburgo, State of Rio de Janeiro, Brazil

    Science.gov (United States)

    Freitas, Leonardo; Luiza Coelho Netto, Ana

    2017-04-01

    An extreme rainfall event took place in the Mountainous Region of the state of Rio de Janeiro in January 2011, causing a catastrophic landslide that resulted in more than 900 deaths and 350 people disappearances. Precipitation events associated with landslides are common in this region and climate change tends to increase the frequency of intense rains and, consequently, landslides. At the same time, the vulnerability of communities has increased as a result of disorderly urban growth. Despite that, before 2011 communities and public power were not prepared to disaster management..After the 2011 event, public authorities try to established policies to reduce these vulnerabilities. One of the communities where the government acted was Córrego Dantas. However, the actions in this place were carried out in a top-down model, without discussion with population. As a consequence, the performance of public power has amplified social vulnerabilities. Highlight for the truculent removal of residents; resettlement in geographically isolated housing complexes; and the establishment of urbanization policies that go against the interests of the residents. The construction of the Córrego d'Aantas Disaster Risk Management Network (REGER-CD), including residents of affected communities, researchers, NGO members and representatives of the public power, is one way to respond these questions. Within this network, the construction of a proposal for a collective contingency plan, articulated with the municipal contingency plan, is generating residents' empowerment, greater adaptation to risks and reducing the vulnerability of Disasters and mass movements

  11. NASA deep space network operations planning and preparation

    Science.gov (United States)

    Jensen, W. N.

    1982-01-01

    The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.

  12. PREPARE: guidelines for planning animal research and testing.

    Science.gov (United States)

    Smith, Adrian J; Clutton, R Eddie; Lilley, Elliot; Hansen, Kristine E Aa; Brattelid, Trond

    2018-04-01

    There is widespread concern about the quality, reproducibility and translatability of studies involving research animals. Although there are a number of reporting guidelines available, there is very little overarching guidance on how to plan animal experiments, despite the fact that this is the logical place to start ensuring quality. In this paper we present the PREPARE guidelines: Planning Research and Experimental Procedures on Animals: Recommendations for Excellence. PREPARE covers the three broad areas which determine the quality of the preparation for animal studies: formulation, dialogue between scientists and the animal facility, and quality control of the various components in the study. Some topics overlap and the PREPARE checklist should be adapted to suit specific needs, for example in field research. Advice on use of the checklist is available on the Norecopa website, with links to guidelines for animal research and testing, at https://norecopa.no/PREPARE .

  13. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  14. Early and unintentional release of planned motor actions during motor cortical preparation.

    Directory of Open Access Journals (Sweden)

    Colum D MacKinnon

    Full Text Available Voluntary movements are often preceded by a movement-related potential beginning as much as two seconds prior to the onset of movement. In light of evidence that motor actions can be prepared and initiated in less than 200 ms, the function of this early activity has remained enigmatic. We hypothesized that the movement-related potential reflects the state of preparation of the planned movement. This was tested by delivering a startling acoustic stimulus during the preparation phase of a load-release task. The cue to release the load was presented either 3.5 seconds after a warning cue (PREDICT condition or randomly between 4-12 seconds (REACT condition. Electroencephalographic, electromyographic and limb and load kinematic signals were recorded. In a subset of trials, a startle stimulus was delivered at -1500, -1000, -500, -250, -100 or 0 ms before the release cue. A contingent-negative variation (CNV waveform, with a late phase of slow-rising negativity beginning an average of 1459 ms prior to movement, was observed for the PREDICT condition but not the REACT condition. For both conditions, the startle stimulus frequently evoked the early and unintentional release of the load-release sequence. The incidence of release was significantly (p<0.001 correlated with the late phase of the CNV for the PREDICT condition but not the REACT condition. For the REACT condition, the incidence of movement release was subject-specific, constant across the preparation interval, and uncorrelated with cortical activity. The onset of movement release by the startle stimulus was significantly shorter (p<0.001 for the PREDICT compared to the REACT condition. These findings provide evidence that the late phase of the CNV reflects cortical activity mediating the progressive preparation and storage of the forthcoming movement and that during this phase an intense sensory stimulus can evoke early and unintentional release of the planned action.

  15. Planning urban megaprojects in the Gulf: The international consultancy firms in urban planning between global and contingent

    Directory of Open Access Journals (Sweden)

    Oula Aoun

    2016-06-01

    Full Text Available Driven by globalization and market openings, many architecture and engineering firms have become global. By focusing on the urban megaprojects in the Gulf, a particular cultural and political context, this paper argues that such firms have a major role in the rapid urban transformation of Gulf countries and act as transfer agents of an international knowledge in the urban planning domain. However, the transfer is adapted by several context-related characteristics, such as local governance, urban knowledge, and regulatory framework. This paper explores the procedural adaptation of these firms to the Gulf Cooperation Council (GCC in terms of internal structure, methodology, adopted tools, and interaction with the context. The level of learning that results from this transfer is also investigated.

  16. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  17. Real-time laboratory exercises to test contingency plans for classical swine fever: experiences from two national laboratories

    DEFF Research Database (Denmark)

    Koenen, K.; Uttenthal, Åse; Meindl-Böhmer, A.

    2007-01-01

    In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning....... It is essential that these plans are established during ‘peace-time’ and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance...

  18. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2015-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  19. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2011-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  20. Detailed oil spill contingency analysis in establishment of preparedness plans for exploration drilling in environmentally sensitive areas: an integrated management process

    Energy Technology Data Exchange (ETDEWEB)

    Spikkerud, Cathrine S.; Skeie, Geir Morten; Brude, Odd Willy; Gravir, Gjermund [DNV Managing Risk, Oslo (Norway)

    2008-07-01

    This paper describes the integrated management process leading up to a dynamic oil spill preparedness plan based on detailed analysis of oil spill contingency requirements and environmental risk in environmentally sensitive areas. Starting with a detailed environmental risk and oil spill contingency analysis, oil spill preparedness plans are developed. These plans are generic for the area possibly affected by an oil spill, and are developed in detail for environmental 'hot spots' that are highly challenging in terms of oil spill response. The detailed plans make use of detailed data sets on shoreline substrate sensitivities and cleanup methodology, photographic inventory, logistical issues and access to real-time incident data for important areas. This detailed approach ensures sufficient knowledge about the sensitive area in advance to provide fast and correct strategic and tactical operational recovery decisions. A final element of the integrated process is a web based GIS, providing all parties involved with one common situation overview, ensuring that the facts remain in focus throughout the operation and that those responsible for informing stake-holders have access to correct and timely updated information. (author)

  1. Standard format and content of a licensee physical protection plan for strategic special nuclear material in transit - April 1980

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    A predetermined plan to respond to safeguards contingency events is required to be prepared, based on personnel and other physical protection resources described in the Physical Protection Plan for strategic special nuclear material (SSNM) in transit. Specific requirements for the contingency plan are provided in Appendix C. Licensee Safeguards Contingency Plans, to 10 CFR Part 73. Regulatory Guide 5.56, Standard Format and Content of Safeguards Contingency Plans for Transportation, provides guidance for the preparation of transportation contingency plans. Licensee is reminded that all three submissions - the Physical Protection Plan, the Physical Protection Arrangements for Specific Shipments, and the Safeguards Contingency Plan - together describe the system for physical protection of each particular shipment. They should be developed and maintained to be completely consistent with each other for each shipment

  2. Mental fatigue and task control : Planning and preparation

    NARCIS (Netherlands)

    Lorist, MM; Klein, Martin; Nieuwenhuis, S; De Jong, R; Mulder, G; Meijman, TF

    The effects of mental fatigue on planning and preparation for future actions were examined, using a task switching paradigm. Fatigue was induced by "time on task," with subjects performing a switch task continuously for 2 hr. Subjects had to alternate between tasks on every second trial, so that a

  3. Engaging Students in Career Planning and Preparation through Ementoring

    Science.gov (United States)

    Kinkel, Doreen H.

    2011-01-01

    Following a developmental model of career planning and preparation, an ementoring program was devised for first semester freshmen to (1) heighten career awareness and stimulate career exploration in food and agricultural sciences; (2) expand interest and willingness to follow career opportunities beyond the regional geographic area; and (3)…

  4. Study of the Model of Activating Contingency Plans within Disruptive Incidents by Stages%突发事件下分阶段启动应急预案模型研究

    Institute of Scientific and Technical Information of China (English)

    于辉; 江智慧

    2011-01-01

    经前期处置下,研究管理者面对突发事件应该何时启动前期处置方案和应急预案的问题.在完全没有突发事件持续时阎信息的条件下,利用局内决策理论与方法构建了企业何时启动前期处置方案和应急预案的分阶段启动模型,并利用"竞争比"说明该方案的有效性.在此基础上,进一步通过数值分析表明分阶段启动应急预案的重要意义.%The increased number of natural disasters has disrupted social and economic progress. Minimizing the impact of these disasters can bring stability to society. Emergency response systems have played an important role in achieving this goal. Since the "SARS" crisis in the year 2003, China has begun to focus on building emergency response systems. A national contingency plan system was established in 2004 according to the "Classification" rule. China initially formed a main emergency plan system,constituted by national overall emergency response plans, specific contingency plans, department emergency plans, local emergency plans, and contingency plans for enterprises with large-scale activities.Existing literature has focused on the importance of contingency plans, the assessment of contingency plans, and approaches to improving emergency preparedness. Few studies have addressed problems associated with the activation of contingency plans when the public administration is disrupted by natural disasters. This paper investigates how managers activate contingency plans at the predisposal stage and potential problems that may arise from disruption by natural disasters at this stage. Case studies are conducted and our analysis results show that activating contingency plans at the pre-disposition stage is effective at dealing with public crises caused by natural disasters. A mathematical model is constructed to provide information on when to activate contingency plans in different phases.Decision theories and methods are used to help propose an

  5. Standard Practice for Preparation of Aerospace Contamination Control Plans

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This practice is intended to assist in the preparation of formal plans for contamination control, especially of aerospace critical surfaces. Requirements may be established at the systems level, either by the customer or the systems integrator, or at the subsystem level. Subsystem requirements may be imposed by the responsible subsystem supplier or they may be flowed down from the systems organization (4.7). The extent of detail and level of cleanliness required can vary with the particular application and type of hardware being built, but all aspects of contamination control must be included in a final plan. Therefore, each of the following elements must be considered for inclusion in a contamination control plan (CCP): 1.1.1 Cleanliness requirements for deliverable hardware addressing particulate, molecular, or biological contaminants or combination thereof. Specify contamination limits and any budget allocations. 1.1.2 Implementation plans to achieve, verify, and maintain the specified cleanliness re...

  6. Outage preparation milestones - A tool to improve planned outage performance

    International Nuclear Information System (INIS)

    Laplatney, Jere; Hwang, Euiyoub

    2006-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depend heavily on the performance of planned outages. Nuclear Power Plants who have successfully undertaken outage optimization projects have demonstrated than an effective Outage Preparation Milestone program is a key component of their improvement programs. This paper will provide background into the field of 'Outage Optimization' including the philosophy, general approach, and results obtained in the U. S. industry. The significant safety improvements afforded by properly implementing outage improvement programs will be explained. Some specific examples of outage improvements will be given including the adoption of a strong Outage Preparation Milestone Program. The paper will then describe the attributes of an effective Outage Preparation Milestone Program and list a set of specific key milestones. The key milestones are defined and the reasons for each are explained. Suggested due dates for each key milestone relative to the outage start date are provided. Successful implementation of an Outage Preparation Milestone program depends heavily upon the management tools and methods used to assure that the organization meets the milestones on time and in a quality fashion. These include methods to handle cases where milestones are not met - either partially or fully. KHNP is investigating implementing an improved Outage Preparation Milestone program for its fleet of reactors as part of its overall program to improve its performance of planned outages

  7. Preparation of site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This safety guidelines is issued as a lead document to facilitate preparation of specific site manuals by the responsible organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publications on the subject: Safety manual on site emergency plan on nuclear installations. AERB/SM/NISD-1, 1986 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come about in a significant manner after the accidents at Chernobyl and Bhopal

  8. Province of Ontario nuclear emergency plan. Pt. 1

    International Nuclear Information System (INIS)

    1986-06-01

    The Province of Ontario Nuclear Emergency Plan has been developed pursuant to Section 8 of the Emergency Plans Act, 1983. This plan replaces the Province of Ontario Nuclear Contingency Off-Site Plan (June 1980) which is no longer applicable. The wastes plan includes planning, preparation, emergency organization and operational responsibilities and policy

  9. Workshop on the preparation of climate change action plans. Workshop summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  10. Contingency proportion systematically influences contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2018-01-01

    In the color-word contingency learning paradigm, each word appears more often in one color (high contingency) than in the other colors (low contingency). Shortly after beginning the task, color identification responses become faster on the high-contingency trials than on the low-contingency trials-the contingency learning effect. Across five groups, we varied the high-contingency proportion in 10% steps, from 80% to 40%. The size of the contingency learning effect was positively related to high-contingency proportion, with the effect disappearing when high contingency was reduced to 40%. At the two highest contingency proportions, the magnitude of the effect increased over trials, the pattern suggesting that there was an increasing cost for the low-contingency trials rather than an increasing benefit for the high-contingency trials. Overall, the results fit a modified version of Schmidt's (2013, Acta Psychologica, 142, 119-126) parallel episodic processing account in which prior trial instances are routinely retrieved from memory and influence current trial performance.

  11. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    National Research Council Canada - National Science Library

    Baldwin, Laura H; Ausink, John A; Campbell, Nancy F; Drew, John G; Roll, Jr, Charles R

    2008-01-01

    ...) in an effort to determine the size and extent of contractor support, and how plans for and the organization and execution of contingency contracting activities might be improved so that Contingency...

  12. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  13. The management plan preparation activities nuclear power plant in Indonesia

    International Nuclear Information System (INIS)

    Utomo

    2011-01-01

    A feasibility Study that has been updated show that two nuclear power units with each unit of power up to 1000 MWe can represent decently an economical alternative energy supply. It added that the available time schedule was quite tight so that the preparation for the development must be starting first. This paper will discuss the preparation of plans of the first nuclear power plant which includes program activities, the structure of contracts, schedules of activities and funding. From the information obtained to date that in addition to a candidate site that is ready to be built in Muria peninsula is still required another potential alternative site besides to search other complete data information. This site investigation activities completed within the time schedule was passed ''critical path'', so that these activities should be carried out intensively and obey the time. This paper describes the steps that need to be prepared to welcome the first nuclear power plant, after reviewing the various input above and apply the reality in Indonesia as the initial conditions. (author)

  14. [Planning by service organisation priorities. The process of preparing strategic service-organisation plans].

    Science.gov (United States)

    Sampietro-Colom, Laura; Costa, Dolors; Busqué, Anna; Lacasa, Carme

    2008-12-01

    Strategic planning designs the general setting and the strategic principles of a healthcare system, as well as the general guidelines that govern the development of a health system. Strategic service-organisation plans deal with translating healthcare policies into service policies and respond, principally, to the need for services; these give rise to problems that require a solution. They are developed in line with advances in scientific knowledge, the implementation and current characteristics of the healthcare services and the evolution in the competences of professional teams. There are five stages for their development: identification of health/service requirements; prioritisation of needs in health/services; definition of and agreement on service organisation models (care model and service portfolio); the preparation of and agreement on territorial action plans; introduction and evaluation. A conceptual framework is presented along with practical applications carried out in Catalonia.

  15. Model for negotiation on contingency plans for distribution of natural gas; Modelo de negociacao para planos de contingencia energetica na area de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Sobral, Marcos Felipe Falcao; Morais, Danielle Costa [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil)

    2008-07-01

    The high consumption of Natural Gas (NG), the environmental and economic turbulences that occurred in recent years raises questions about the supply of the product in critical situations. Characteristic factors of natural gas, like the high cost of storage, show the need for the establishment of contingency plans that define what procedures should be adopted in the distribution of Natural Gas or redistribute among consumers in times of restriction of supply, substantial increase on demand or reduction in the ability of supply. These plans aim to define in advance the actions that will be adopted, providing business and consumer segments clear rules indicate the time to search for alternative sources in case of crisis. The current models can not yet address the problem of negotiation for the division of the product following the concepts proposed by the science of trading, making things like proportionality and envy-free are not observed. The aim of this study is to propose a model for distribution of quotas for supply of NG between different consumer segments. The proposed algorithm combines the procedures of Knaster, Steinhaus and Divide the Dollar, seeking an allocation that minimize the feeling of jealousy and provide an equitable distribution. (author)

  16. Contingency Teaching during Close Reading

    Science.gov (United States)

    Fisher, Douglas; Frey, Nancy

    2015-01-01

    12 teachers were interviewed and observed as they engaged students in close reading. We analyzed their responses and instruction to determine the scaffolds that were used as well as the contingency teaching plans they implemented when students were unable to understand the text.

  17. Dynamic Contingency Analysis Tool

    Energy Technology Data Exchange (ETDEWEB)

    2016-01-14

    The Dynamic Contingency Analysis Tool (DCAT) is an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power system planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. Outputs from the DCAT will help find mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. The current prototype DCAT implementation has been developed as a Python code that accesses the simulation functions of the Siemens PSS/E planning tool (PSS/E). It has the following features: It uses a hybrid dynamic and steady-state approach to simulating the cascading outage sequences that includes fast dynamic and slower steady-state events. It integrates dynamic models with protection scheme models for generation, transmission, and load. It models special protection systems (SPSs)/remedial action schemes (RASs) and automatic and manual corrective actions. Overall, the DCAT attempts to bridge multiple gaps in cascading-outage analysis in a single, unique prototype tool capable of automatically simulating and analyzing cascading sequences in real systems using multiprocessor computers.While the DCAT has been implemented using PSS/E in Phase I of the study, other commercial software packages with similar capabilities can be used within the DCAT framework.

  18. Tethered Satellite System Contingency Investigation Board

    Science.gov (United States)

    1992-11-01

    The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether

  19. PETROBRAS Transportes (TRANSPETRO) contingency plan system; Metodologia SIE (Sistema Informatizado de Emergencia) aplicada no gerenciamento das contingencias

    Energy Technology Data Exchange (ETDEWEB)

    Berardinelli, Ricardo; Mendonca, Daniela [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil). Coordenacao de Seguranca, Saude e Meio Ambiente de Dutos e Terminais; Morais, Lucia B.; Carvalho, Marcelo Tilio M. de [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Informatica. Grupo de Tecnologia em Computacao Grafica (TECGRAF)

    2005-07-01

    This paper describes the PETROBRAS Transportes Emergency Response System, which was designed to improve the response to emergency situations. The plans are defined based on an evaluation of the organization of the emergency teams, the communication procedures, characterization of the installations, definition of accidental scenarios, environmental sensitivity maps; simulation of oil spill trajectories and dispersion behavior; geographical data of the area surrounding the installations; other conventional data related to the installations, including equipment available and the InfoPAE system. Plans include several scenarios as oil spills, gas, fire, explosion, hazardous materials which can be applied to terminals and pipelines. (author)

  20. 77 FR 12644 - Submission of U.S. Carrier and Airport Tarmac Delay Contingency Plans to Department of...

    Science.gov (United States)

    2012-03-01

    ... (Enforcement Office) will be establishing an electronic submission system to enable covered airlines and... also contain a description of how the carrier will: (1) Provide adequate food, potable water, restroom... complaint reporting system, where covered airlines and airports will submit their required plans. The...

  1. 77 FR 27267 - Submission of U.S. Carrier and Airport Tarmac Delay Contingency Plans to Department of...

    Science.gov (United States)

    2012-05-09

    ... also contain a description of how the carrier will: (1) Provide adequate food, potable water, restroom... , similar to the Department's current disability complaint reporting system, to enable covered U.S. airlines... to use the tarmac delay plan filing system, covered U.S. airlines and airports will need to register...

  2. 78 FR 35957 - Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska...

    Science.gov (United States)

    2013-06-14

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAKF030.16100000.DO0000.LXSILCYK0000] Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska and... management. 8. The RMP will be consistent with the Bureau's H-1601-1 Land Use Planning Handbook, Appendix C...

  3. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  4. Evaluation and analysis of emergency maintenance due by third party action's, formulation and execution of contingency plans

    Energy Technology Data Exchange (ETDEWEB)

    Torres Vega, Raul; Nunez Ribera, Gary [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2009-07-01

    In September 2008, in the Yacuiba - Rio Grande Gas Pipeline (GASYRG) located in the south of Bolivia, atypical situations took place. Due to the political events and the social mobilizations in which the country was, a series of third party actions developed putting in risk the facilities of the gas pipeline. These actions resulted in the rupture of a 1 inch instrumentation pipe, causing a leak witch some time caught fire and caused an interruption of the transportation service in that section of the pipeline, later on, another action derived in safety valve shut down causing a total pipeline shut down. In addition to these events we experience a fuel shortage, road blocks and a telephone communication system failure. In spite of these obstacles the maintenance activities were realized and emergency repairs put back in operating conditions the gas pipeline, task that was accomplished in a very short time, taking in account the situation. Later analysis, including all the adverse elements of the situation, result in the adoption of a series of measures and plans directed to mitigate the risk associated to this type of events, such as Mutual Aid Plans with fellow companies and institutions, fortification of the patrimonial security, stock material handling for emergency repairs, etc. (author)

  5. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    Energy Technology Data Exchange (ETDEWEB)

    Munger, M.; Bryant, T. [Cook Inlet Regional Citizen' s Advisory Council, Kenai, AK (United States); Haugstad, E.; Kwietniak, J. [Tesora Alaska Petroleum, Kenai, AK (United States); DeCola, E.; Robertson, T. [Nuka Research and Planning Group, Seldovia, AK (United States)

    2006-07-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs.

  6. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    International Nuclear Information System (INIS)

    Munger, M.; Bryant, T.; Haugstad, E.; Kwietniak, J.; DeCola, E.; Robertson, T.

    2006-01-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs

  7. Contingency Operations of Americas Next Moon Rocket, Ares V

    Science.gov (United States)

    Jaap, John; Richardson, Lea

    2010-01-01

    and cause of a partially separated payload shroud. Other mitigations are really alternate missions; example, an engine out on during ascent resulted in insufficient propellant for the lunar mission, but the on-orbit vehicle stack is otherwise perfect and can pursue an alternate mission, such as a high ballistic trajectory to test the high-speed atmospheric reentry of Orion. Evaluation and presentation of contingency operations at this early stage of the development of the Ares V rocket will improve the design of the vehicle and lay the groundwork for the exhaustive contingency planning which must be done after the vehicle is built as preparations for operations.

  8. 25 CFR 39.501 - What is an emergency or unforeseen contingency?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is an emergency or unforeseen contingency? 39.501... EQUALIZATION PROGRAM Contingency Fund § 39.501 What is an emergency or unforeseen contingency? An emergency or unforeseen contingency is an event that meets all of the following criteria: (a) It could not be planned for...

  9. Exercise ASKARI SERPENT: enabling clinical data collection during exercises and operations to support future contingency planning and assurance of category-based reporting systems.

    Science.gov (United States)

    Parsons, Iain T; Wheatley, R J; Carter, P

    2016-02-01

    Exercise ASKARI SERPENT (Ex AS) is a British Army exercise that provides primary healthcare (PHC) to Kenyan civilians in support of local health authorities. It is conducted in partnership with the Kenya Defence Force Medical Services (KDFMS). Accurate epidemiological data is critical in planning the exercise and for any future short-notice contingency operations in similar environments. This paper reports epidemiological data for Ex AS using a novel data collection system. PHC on Ex AS was delivered by trained and validated combat medical technicians (CMTs) using a set of Read-coded protocols. The CMTs were also directly supported and supervised by medical officers and nurses. A total of 3093 consultations were conducted over a 16-day period. Of these, 2707 (87.5%) consultations fell within the remit of the CMT protocols, with only 386 consultations (12.5%) being conducted exclusively by the medical officers or nurses. A Read-coded matrix built on CMT protocols is a simple and useful tool, particularly in civilian populations, for collecting morbidity data with the vast majority of conditions accounted for in the protocols. It is anticipated that such a system can better inform training, manning, medical material and pharmaceutical procurement than current category-based morbidity surveillance systems such as EPINATO (NATO epidemiological data). There is clear advantage to directly linking data capture to treatment algorithms. Accuracy, both in terms of numbers and condition, is likely improved. Data is also captured contemporaneously rather than after indeterminate time. Read coding has the added benefit of being an established electronic standard. In addition, the system would support traditional reporting methods such as EPINATO by providing increased assurance. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  10. Business Continuity Planning for Nursing Schools: Preparation for Potential Disasters.

    Science.gov (United States)

    Zerwic, Julie J; Rosen, Denise

    2016-01-01

    Nursing schools are vulnerable to disasters, ranging from pandemics to weather emergencies, fires, and acts of terrorism. To ensure minimal disruptions to teaching, provision of care, research, and other critical missions, nursing faculty and administrative leaders should develop a business continuity plan. The business continuity plan can help faculty, students, and administration identify critical functions and alternative plans if an emergency occurs. We offer our experience as a guide for other nursing schools.

  11. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORE00000 L63500000.DO0000.LXSS021H0000.HAG11-0203] Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  12. A guide for preparing Hanford Site facility effluent monitoring plans

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1992-06-01

    This document provides guidance on the format and content of effluent monitoring plans for facilities at the Hanford Site. The guidance provided in this document is designed to ensure compliance with US Department of Energy (DOE) Orders 5400.1 (DOE 1988a), 5400.3 (DOE 1989a), 5400.4 (DOE 1989b), 5400.5 (DOE 1990a), 5480.1 (DOE 1982), 5480.11 (DOE 1988b), and 5484.1 (DOE 1981). These require environmental monitoring plans for each site, facility, or process that uses, generates, releases, or manages significant pollutants of radioactive or hazardous materials. In support of DOE Orders 5400.5 (Radiation Protection of the Public and the Environment) and 5400.1 (General Environmental Protection Program), the DOE Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE 1991) should be used to establish elements of a radiological effluent monitoring program in the Facility Effluent Monitoring Plan. Evaluation of facilities for compliance with the US Environmental Protection Agency Clean Air Act of 1977 requirements also is included in the airborne emissions section of the Facility Effluent Monitoring Plans. Sampling Analysis Plans for Liquid Effluents, as required by the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), also are included in the Facility Effluent Monitoring Plans. The Facility Effluent Monitoring Plans shall include complete documentation of gaseous and liquid effluent sampling and monitoring systems

  13. Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This standard guide applies to developing nuclear facility characterization plans to define the type, magnitude, location, and extent of radiological and chemical contamination within the facility to allow decommissioning planning. This guide amplifies guidance regarding facility characterization indicated in ASTM Standard E 1281 on Nuclear Facility Decommissioning Plans. This guide does not address the methodology necessary to release a facility or site for unconditional use. This guide specifically addresses: 1.1.1 the data quality objective for characterization as an initial step in decommissioning planning. 1.1.2 sampling methods, 1.1.3 the logic involved (statistical design) to ensure adequate characterization for decommissioning purposes; and 1.1.4 essential documentation of the characterization information. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate saf...

  14. Universities prepare as physicists plan to pop protons

    CERN Multimedia

    2007-01-01

    "The world's largest science experiment, a physics experiment designed to determine the nature of matter, will produce a mountain of data. And because the world's physicists cannot move to the mountain, an army of computer research scientists is preparing to move the mountain to the physicists." (3 pages)

  15. Preparing US community greenhouse gas inventories for climate action plans

    International Nuclear Information System (INIS)

    Blackhurst, Michael; Scott Matthews, H; Hendrickson, Chris T; Sharrard, Aurora L; Azevedo, Ines Lima

    2011-01-01

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  16. Preparing US community greenhouse gas inventories for climate action plans

    Energy Technology Data Exchange (ETDEWEB)

    Blackhurst, Michael [Department of Civil, Architectural and Environmental Engineering, The University of Texas at Austin, 1 University Station C1752, Austin, TX 78712-0276 (United States); Scott Matthews, H; Hendrickson, Chris T [Department of Civil and Environmental Engineering, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States); Sharrard, Aurora L [Green Building Alliance, 333 East Carson Street, Suite 331, Pittsburgh, PA 15219 (United States); Azevedo, Ines Lima, E-mail: mblackhurst@gmail.com, E-mail: hsm@cmu.edu, E-mail: auroras@gbapgh.org, E-mail: cth@andrew.cmu.edu, E-mail: iazevedo@cmu.edu [Department of Engineering and Public Policy, Carnegie Mellon University, 119 Porter Hall, Pittsburgh, PA 15213 (United States)

    2011-07-15

    This study illustrates how alternative and supplemental community-level greenhouse gas (GHG) inventory techniques could improve climate action planning. Eighteen US community GHG inventories are reviewed for current practice. Inventory techniques could be improved by disaggregating the sectors reported, reporting inventory uncertainty and variability, and aligning inventories with local organizations that could facilitate emissions reductions. The potential advantages and challenges of supplementing inventories with comparative benchmarks are also discussed. While GHG inventorying and climate action planning are nascent fields, these techniques can improve CAP design, help communities set more meaningful emission reduction targets, and facilitate CAP implementation and progress monitoring.

  17. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    Science.gov (United States)

    2016-09-01

    supporting documentation for reviews that the U.S. Forces-Afghanistan conducted beginning in November 2011 of planned or ongoing contingency ...12 Contingency basing includes the planning , designing, constructing, operating, managing, and transitioning or closing of a non-enduring location...2016). Background Definition of “ Contingency Construction” Project Page 7 GAO-16-406 Defense Infrastructure statutory authority

  18. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  19. Preparing for change: the plan, the promise, and the parachute.

    Science.gov (United States)

    Nation, Cathryn L; Gerstenberger, Andrea; Bullard, Dena

    2007-12-01

    The University of California's (UC's) medical education programs are on the brink of change. In January 2007, the UC system completed a multiyear health sciences planning effort that is the most comprehensive undertaken in decades. For medical student education, the plan calls for an approximately one-third increase in enrollment across the system -- from approximately 650 current medical school graduates per year to a projected 920 graduates annually by the year 2020. During the same period, California's population is expected to increase in size and diversity in ways unmatched by any other state in the nation. The plan calls for development of new programs that will increase enrollment in unique and unprecedented ways. The first phase of this growth is under way and is planned to continue through a series of programs that seek to address the needs of California's medically underserved communities. Areas of focus include rural health and telemedicine (Davis); the Spanish-speaking Latino community (Irvine); diverse, disadvantaged communities (Los Angeles); health disparities and health equity (San Diego); and the urban underserved (San Francisco and Berkeley). In November 2006, UC medical schools received $200 million in bond funding to support this growth and to create new telemedicine programs to increase access to services provided by faculty physicians. In the coming years, UC medical schools will face demographic and budgetary challenges that will require perseverance, creativity, and certain leaps of faith. Public expectations are high.

  20. University Strategic Planning: A Process for Change in a Principal Preparation Program

    Science.gov (United States)

    Guerra, Federico R.; Zamora, Roberto; Hernandez, Rosalinda; Menchaca, Velma

    2017-01-01

    This study describes a strategic planning process used for developing an educational leadership program that prepares principals for leading 21st century schools. The plan is based on recommendations received from the External reviewers representing Southern Association of Colleges and Schools, the Texas Education Agency, survey responses received…

  1. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Science.gov (United States)

    2010-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  2. TECHNICAL DOCUMENT PREPARATION PLAN FOR THE RETRIEVABILITY STRATEGY REPORT

    International Nuclear Information System (INIS)

    P.D. Gehner

    1997-01-01

    The objective of this systems study is to produce a waste removability strategy document that contains sufficient details, recommended design alternatives, and the technical rationale (a) to support Licensing in the development of the License Application Plan, and (b) to provide input in the form of design requirements, for the FY 97 Retrieval Design & Operation activity in support of viability assessment. The intent of this systems study is to support a decision on how to proceed with design with respect to retrievability, regarding the extent to which the repository/waste package designs should accommodate the retrieval option

  3. Rapid Automated Mission Planning System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  4. Thomas Aquinas on Contingency of Nature

    Czech Academy of Sciences Publication Activity Database

    Dvořák, Petr

    2008-01-01

    Roč. 5, č. 2 (2008), s. 185-196 ISSN 1214-8407 R&D Projects: GA AV ČR(CZ) IAA900090602 Institutional research plan: CEZ:AV0Z90090514 Keywords : Thomas Aquinas * determinism * contingency Subject RIV: AA - Philosophy ; Religion

  5. 77 FR 71824 - Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an...

    Science.gov (United States)

    2012-12-04

    ... a plan amendment is required to process a direct sale. The purpose of the public scoping process is...] Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an Associated..., Redding, California, intends to prepare an amendment to the 1993 Redding Resource Management Plan (RMP...

  6. Lone Actor Terrorist Attack Planning and Preparation : A Data-Driven Analysis

    NARCIS (Netherlands)

    Schuurman, B.W.; Bakker, E.; Gill, P.; Bouhana, N.

    2017-01-01

    This article provides an in-depth assessment of lone actor terrorists’ attack planning and preparation. A codebook of 198 variables related to different aspects of pre-attack behavior is applied to a sample of 55 lone actor terrorists. Data were drawn from open-source materials and complemented

  7. Effects of Teacher Preparation Courses: Do Graduates Use What They Learned to Plan Mathematics Lessons?

    Science.gov (United States)

    Morris, Anne K.; Hiebert, James

    2017-01-01

    We investigated whether the content pre-service teachers studied in elementary teacher preparation mathematics courses was related to their performance on a mathematics lesson planning task 2 and 3 years after graduation. The relevant mathematics knowledge was studied when the teachers were freshmen, 5 to 6 years earlier. Results showed that when…

  8. Contingencies of Value

    DEFF Research Database (Denmark)

    Strandvad, Sara Malou

    2014-01-01

    Based on a study of the admission test at a design school, this paper investigates the contingencies of aesthetic values as these become visible in assessment practices. Theoretically, the paper takes its starting point in Herrnstein Smith’s notion of ‘contingencies of values’ and outlines...... a pragmatist ground where cultural sociology and economic sociology meet. Informed by the literature on cultural intermediaries, the paper discusses the role of evaluators and the devices which accompany them. Whereas studies of cultural intermediaries traditionally apply a Bourdieusian perspective, recent......, the paper does not accept this storyline. As an alternative, the paper outlines the contingencies of values which are at play at the admission test, composed of official assessment criteria and scoring devices together with conventions within the world of design, and set in motion by interactions...

  9. Issues and dilemmas in preparation and implementation of the spatial plan of the municipality

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2012-01-01

    Full Text Available Disadvantages of the Serbian planning system and dilemmas about the role of spatial planning in Serbia mainly is reflected at the local level of spatial planning. The focus of the spatial plan of the municipality from the strategic to regulatory role has been shifted by the changes of legal basis. In this paper the key issues and dilemmas in the practice of preparation and implementation of the spatial plan of the municipality in Serbia are pointed out. The review of the three key issues of importance for the direct implementation of planning solutions and concepts: identification of the construction zone, the establishment of rules for the protection, arrangement and construction of physical (natural, landscape and functional entities and settlements, and elaboration of arrangement scheme for the settlement are presented. It has still not made clear what the arrangement scheme for the settlement should represent, so that in practice there is wide variety of schemes, usually completely unenforceable. Good examples of arrangement schemes elaboration within spatial plan of the municipality have been presented and analyzed. Suggestions for improving the content of the strategic and regulatory elements of the spatial plan of the municipality, as well as recommendations to the basic content of the arrangement scheme for settlement as a part of this spatial plan are proposed.

  10. 78 FR 4868 - Notice of Intent To Amend the California Desert Conservation Area Plan and Prepare an Associated...

    Science.gov (United States)

    2013-01-23

    ... specifically identified for sale in the CDCA Plan, as amended, and a plan amendment is therefore required to.... The BLM anticipates that the EA will consider both a plan amendment and the subsequent sale of the...] Notice of Intent To Amend the California Desert Conservation Area Plan and Prepare an Associated...

  11. 77 FR 60718 - Notice of Intent To Prepare an Amendment to the California Desert Conservation Area Plan and...

    Science.gov (United States)

    2012-10-04

    ... above is currently not available for sale under the 1980 CDCA Plan as amended, and a plan amendment is required to process a direct sale. This plan amendment will be limited to an analysis of whether the public...; CACA-53705] Notice of Intent To Prepare an Amendment to the California Desert Conservation Area Plan...

  12. Do older adults with Alzheimer's disease engage in estate planning and advance care planning preparation?

    Science.gov (United States)

    Choi, Shinae; Kim, Minjung; McDonough, Ian M

    2018-04-18

    This study investigated the estate planning and advance care planning (ACP) of older adults diagnosed with Alzheimer's disease (AD) for the presence of (1) a valid will, (2) a durable power of attorney for health care, and (3) a living will. We analyzed 10,273 adults aged 65 and older from the 2012 Health and Retirement Study (HRS) using multilevel logistic regression. We found that a diagnosis of AD was significantly associated with the ACP variables. Older adults with AD were more likely to assign a durable power of attorney for health care and have a written living will than older adults without an AD diagnosis. However, we found no significant association between a diagnosis of AD and having a valid will. These findings were robust when adjusting for demographic and socioeconomic variables. Other factors decreased engagement in estate planning and ACP, including lower socioeconomic status, being male, and being a minority. Our findings suggest that a diagnosis of AD is associated with more engagement in ACP for individuals and their families, but important barriers exist for people with fewer resources.

  13. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods

  14. Contingent valuation and incentives

    Science.gov (United States)

    Patricia A. Champ; Nicholas E. Flores; Thomas C. Brown; James Chivers

    2002-01-01

    We empirically investigate the effect of the payment mechanism on contingent values by asking a willingness-to-pay question with one of three different payment mechanisms: individual contribution, contribution with provision point, and referendum. We find statistical evidence of more affirmative responses in the referendum treatment relative to the individual...

  15. [Attitudes and habits of Canadians in relation to planning and preparing meals at home].

    Science.gov (United States)

    Aubé, Julie; Marquis, Marie

    2011-01-01

    To describe the attitudes and habits of Canadians in relation to planning and preparing meals at home, in order to identify motivations that can be used to promote home cooking. An electronic survey consisting of 39 multiple-choice questions was posted on the Dietitians of Canada website between November 16 and December 22, 2006. The statements analyzed have to do with perceived benefits associated with home cooking, obstacles preventing people from cooking, preparation time and meal planning, learning to cook, and sources of recipe ideas. A total of 4,080 people filled out the questionnaire. Although they believe that home cooking can improve diet quality and eating behaviours, respondents experience several obstacles relating to day-to-day food preparation. Among these are lack of time, energy, ideas, and planning. This study underlines the relevance of creating strategies not only for educating consumers about the benefits of home cooking, but also for providing practical information to help them overcome obstacles limiting the day-to-day preparation of food.

  16. Planning and Preparing for Emergency Response to Transport Accidents Involving Radioactive Material. Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide provides guidance on various aspects of emergency planning and preparedness for dealing effectively and safely with transport accidents involving radioactive material, including the assignment of responsibilities. It reflects the requirements specified in Safety Standards Series No. TS-R-1, Regulations for the Safe Transport of Radioactive Material, and those of Safety Series No. 115, International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. Contents: 1. Introduction; 2. Framework for planning and preparing for response to accidents in the transport of radioactive material; 3. Responsibilities for planning and preparing for response to accidents in the transport of radioactive material; 4. Planning for response to accidents in the transport of radioactive material; 5. Preparing for response to accidents in the transport of radioactive material; Appendix I: Features of the transport regulations influencing emergency response to transport accidents; Appendix II: Preliminary emergency response reference matrix; Appendix III: Guide to suitable instrumentation; Appendix IV: Overview of emergency management for a transport accident involving radioactive material; Appendix V: Examples of response to transport accidents; Appendix VI: Example equipment kit for a radiation protection team; Annex I: Example of guidance on emergency response to carriers; Annex II: Emergency response guide.

  17. Supervisory Styles: A Contingency Framework

    Science.gov (United States)

    Boehe, Dirk Michael

    2016-01-01

    While the contingent nature of doctoral supervision has been acknowledged, the literature on supervisory styles has yet to deliver a theory-based contingency framework. A contingency framework can assist supervisors and research students in identifying appropriate supervisory styles under varying circumstances. The conceptual study reported here…

  18. Contingency diagrams as teaching tools

    OpenAIRE

    Mattaini, Mark A.

    1995-01-01

    Contingency diagrams are particularly effective teaching tools, because they provide a means for students to view the complexities of contingency networks present in natural and laboratory settings while displaying the elementary processes that constitute those networks. This paper sketches recent developments in this visualization technology and illustrates approaches for using contingency diagrams in teaching.

  19. Planning "discrete" movements using a continuous system: insights from a dynamic field theory of movement preparation.

    Science.gov (United States)

    Schutte, Anne R; Spencer, John P

    2007-04-01

    The timed-initiation paradigm developed by Ghez and colleagues (1997) has revealed two modes of motor planning: continuous and discrete. Continuous responding occurs when targets are separated by less than 60 degrees of spatial angle, and discrete responding occurs when targets are separated by greater than 60 degrees . Although these two modes are thought to reflect the operation of separable strategic planning systems, a new theory of movement preparation, the Dynamic Field Theory, suggests that two modes emerge flexibly from the same system. Experiment 1 replicated continuous and discrete performance using a task modified to allow for a critical test of the single system view. In Experiment 2, participants were allowed to correct their movements following movement initiation (the standard task does not allow corrections). Results showed continuous planning performance at large and small target separations. These results are consistent with the proposal that the two modes reflect the time-dependent "preshaping" of a single planning system.

  20. 75 FR 25876 - Notice of Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs...

    Science.gov (United States)

    2010-05-10

    ... Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs National Conservation... Environmental Impact Statement, Utah AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent..., intends to prepare Resource Management Plans (RMP) for the Beaver Dam Wash and the Red Cliffs National...

  1. Concept and Planning of Site Preparation for Radioactive Waste Disposal in Jawa and Surrounding Area

    International Nuclear Information System (INIS)

    Heru Sriwahyuni; Sastrowardoyo, Pratomo B.; Teddy Sumantri; Dewi Susilowati; Hendra Adhi Pratama; Syarmufni, A.

    2008-01-01

    Concept and planning for radioactive waste disposal in Jawa and surrounding area have been done. These activities were part of the investigation for preparation of repository location in Jawa. In this report, the summary of previous sitting activities, the waste inventory in Radioactive Waste Technology Centre, and list of important factors for sitting on radioactive waste disposal location. Several potential areas such as Karawang, Subang, Majalengka, Rembang, Tuban, Madura will be the focus for next activities. The result will be part of activities report regarding the preparation of repository location in Jawa and surrounding area, that will be used as recommendation prior to radioactive waste management policy. (author)

  2. Guidance document for preparing water sampling and analysis plans for UMTRA Project sites. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    A water sampling and analysis plan (WSAP) is prepared for each Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide the rationale for routine ground water sampling at disposal sites and former processing sites. The WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine ground water monitoring stations at each site. This guidance document has been prepared by the Technical Assistance Contractor (TAC) for the US Department of Energy (DOE). Its purpose is to provide a consistent technical approach for sampling and monitoring activities performed under the WSAP and to provide a consistent format for the WSAP documents. It is designed for use by the TAC in preparing WSAPs and by the DOE, US Nuclear Regulatory Commission, state and tribal agencies, other regulatory agencies, and the public in evaluating the content of WSAPS

  3. 76 FR 70162 - Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use Plan Amendment To...

    Science.gov (United States)

    2011-11-10

    ... whether the Sun Valley Management Framework Plan should be amended to address the sale. To the extent... sale. This notice initiates the public scoping process for the plan amendment and associated EA. The...] Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use Plan Amendment To Provide...

  4. 75 FR 39916 - Endangered and Threatened Species; Notice of Intent to Prepare a Recovery Plan for the Sei Whale

    Science.gov (United States)

    2010-07-13

    ... Fisheries Service (NMFS) is announcing its intent to prepare a recovery plan for the Sei Whale (Balaenoptera... the fax comments as ``Sei Whale Recovery Plan Information'' 3. Mail: National Marine Fisheries Service... under the ESA. The recovery planning process is guided by the statutory language of Section 4(f) of the...

  5. 78 FR 42970 - Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior...

    Science.gov (United States)

    2013-07-18

    ... integrated into the entire planning process, from preparing the pre-plan to implementation and monitoring; 17... allocations for these lands. Considering wilderness characteristics in the land use planning process may... impacts on Indian trust assets and potential impacts to cultural resources, will be given due...

  6. Social Sensorimotor Contingencies

    OpenAIRE

    Bütepage, Judith

    2016-01-01

    As the field of robotics advances, more robots are employed in our everyday environment. Thus, the implementation of robots that can actively engage in physical collaboration and naturally interact with humans is of high importance. In order to achieve this goal, it is necessary to study human interaction and social cognition and how these aspects can be implemented in robotic agents. The theory of social sensorimotor contingencies hypothesises that many aspects of human-human interaction de...

  7. Preparation of off-site emergency preparedness plans for nuclear installations

    International Nuclear Information System (INIS)

    1999-10-01

    Safety of public, occupational workers and the protection of environment should be assured while activities for economic and social progress are pursued. These activities include the establishment and utilisation of nuclear facilities and use of radioactive sources. This document is issued as a lead document to facilitate preparation of specific site manuals by the Responsible Organisation for emergency response plans at each site to ensure their preparedness to meet any eventuality due to site emergency in order to mitigate its consequences on the health and safety of site personnel. It takes cognizance of an earlier AERB publication on the subject: Safety Manual on Off-Site Emergency Plan for Nuclear Installations, AERB/SM/NISD-2, 1988 and also takes into consideration the urgent need for promoting public awareness and drawing up revised emergency response plans, which has come out in a significant manner after the accidents at Chernobyl and Bhopal

  8. Guidance Manual for preparing Nuclear and Radiological Emergency Preparedness and Response Plan

    Energy Technology Data Exchange (ETDEWEB)

    Muhammed, Kabiru [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Jeong, Seung-Young [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-10-15

    The Nuclear and Radiological Emergency Preparedness and Response Plan(NREPRP) describes the capabilities, responsibilities and authorities of government agencies and a conceptual basis for integrating the activities of these agencies to protect public health and safety. The NREPRP addresses issues related to actual or perceived radiation hazard requiring a national response in order to: i. Provide co-ordination of a response involving multi-jurisdictions or significant national responsibilities; or ii. Provide national support to state and local governments. The objective of this research is to establish Guidance Manual for preparing a timely, organized and coordinated emergency response plan for Authorities/agencies to promptly and adequately determine and take actions to protect members of the public and emergency workers. The manual will not provide sufficient details for an adequate response. This level of details is contained in standard operating procedures that are being developed based on the plan developed. Base on the data obtain from integrated planning levels and responsibility sharing, the legal document of major government agencies participating in NREPRP form the legal basis for the response plan. Also the following documents should be some international legal binding documents. Base on the international safety requirement and some countries well developed NREPRP, we have drafted a guidance manual for new comer countries for easy development of their countries NREPRP. Also we have taken in to consideration lessons learn from most accident especially Fukushima accident.

  9. Guidance Manual for preparing Nuclear and Radiological Emergency Preparedness and Response Plan

    International Nuclear Information System (INIS)

    Muhammed, Kabiru; Jeong, Seung-Young

    2014-01-01

    The Nuclear and Radiological Emergency Preparedness and Response Plan(NREPRP) describes the capabilities, responsibilities and authorities of government agencies and a conceptual basis for integrating the activities of these agencies to protect public health and safety. The NREPRP addresses issues related to actual or perceived radiation hazard requiring a national response in order to: i. Provide co-ordination of a response involving multi-jurisdictions or significant national responsibilities; or ii. Provide national support to state and local governments. The objective of this research is to establish Guidance Manual for preparing a timely, organized and coordinated emergency response plan for Authorities/agencies to promptly and adequately determine and take actions to protect members of the public and emergency workers. The manual will not provide sufficient details for an adequate response. This level of details is contained in standard operating procedures that are being developed based on the plan developed. Base on the data obtain from integrated planning levels and responsibility sharing, the legal document of major government agencies participating in NREPRP form the legal basis for the response plan. Also the following documents should be some international legal binding documents. Base on the international safety requirement and some countries well developed NREPRP, we have drafted a guidance manual for new comer countries for easy development of their countries NREPRP. Also we have taken in to consideration lessons learn from most accident especially Fukushima accident

  10. Consolidation of Contingency Data and Its Use in Computer Graphics to Plan Bare Base Facility Construction at a Forward Operating Location.

    Science.gov (United States)

    1983-09-01

    a number of Harvest Eagle kits positioned in Europe and the Pacific theaters (12). Harvest Bare, a prepackaged kit of prefabricated expandable...Environmental Studies. San Diego University. Ecological Assessment of Vandenberg Air Force Base, California. Volume III. Environ- mental Planning System

  11. Contingency Management of Health Care Organizations: It Depends.

    Science.gov (United States)

    Olden, Peter C

    Managers in health care organizations (HCOs) must perform many processes and activities, such as planning goals, designing organization structure, leading people, motivating employees, making decisions, and resolving conflict. How they do all this strongly affects the performance and outcomes of their organizations and themselves. Some managers develop a usual way of performing their jobs and achieve some success with a preferred method of leading or a favorite approach to motivating. However, their success will be limited if they always rely on a standard "1-size-fits-all" approach. This is because contingency factors influence the effectiveness of a given approach to managing. The "best" approach depends on contingency factors, including the situation and the people involved. Managers should choose an approach to fit with the changing contingency factors. This article explains why and how managers should develop a contingency approach to managing HCOs. The development of contingency theory is briefly described. Practical application of contingency management is explained for leading, motivating, decision making, and resolving conflict. By using a contingency approach, managers can be more effective when managing their HCOs.

  12. Present status and future plans of the study for preparation of Pu reference materials

    International Nuclear Information System (INIS)

    Sumi, Mika; Kageyama, Tomio; Suzuki, Toru

    2007-01-01

    All accountancy analysis at the Plutonium Fuel Development Center of JAEA is performed by isotope dilution mass spectrometry with well-characterized standard materials. Though Pu reference materials has been supplied from foreign country, importing those Pu materials is gradually becoming more difficult and may be almost impossible to import them in future. Thus, in order to establish the capability and expertise for the preparation of Pu reference materials, JAEA has started collaborative work with NBL who has high skills for preparing and supplying nuclear reference materials for long periods. One of the targets of this collaboration is preparation of standard material for IDMS (LSD spike). MOX powder which has been stored in JAEA was dissolved and Purified to obtain Pu solution. A small portion of the Purified solution was transported to NBL for analysis. LSD spike will be prepared from this Pu solution and then validation analysis and performance test including stability test will be performed with NBL and JAEA. This report presents status and future plans for the collaboration work. (author)

  13. EEG signatures of arm isometric exertions in preparation, planning and execution.

    Science.gov (United States)

    Nasseroleslami, Bahman; Lakany, Heba; Conway, Bernard A

    2014-04-15

    The electroencephalographic (EEG) activity patterns in humans during motor behaviour provide insight into normal motor control processes and for diagnostic and rehabilitation applications. While the patterns preceding brisk voluntary movements, and especially movement execution, are well described, there are few EEG studies that address the cortical activation patterns seen in isometric exertions and their planning. In this paper, we report on time and time-frequency EEG signatures in experiments in normal subjects (n=8), using multichannel EEG during motor preparation, planning and execution of directional centre-out arm isometric exertions performed at the wrist in the horizontal plane, in response to instruction-delay visual cues. Our observations suggest that isometric force exertions are accompanied by transient and sustained event-related potentials (ERP) and event-related (de-)synchronisations (ERD/ERS), comparable to those of a movement task. Furthermore, the ERPs and ERD/ERS are also observed during preparation and planning of the isometric task. Comparison of ear-lobe-referenced and surface Laplacian ERPs indicates the contribution of superficial sources in supplementary and pre-motor (FC(z)), parietal (CP(z)) and primary motor cortical areas (C₁ and FC₁) to ERPs (primarily negative peaks in frontal and positive peaks in parietal areas), but contribution of deep sources to sustained time-domain potentials (negativity in planning and positivity in execution). Transient and sustained ERD patterns in μ and β frequency bands of ear-lobe-referenced and surface Laplacian EEG indicate the contribution of both superficial and deep sources to ERD/ERS. As no physical displacement happens during the task, we can infer that the underlying mechanisms of motor-related ERPs and ERD/ERS patterns do not only depend on change in limb coordinate or muscle-length-dependent ascending sensory information and are primary generated by motor preparation, direction

  14. Alternative Forms of Fit in Contingency Theory.

    Science.gov (United States)

    Drazin, Robert; Van de Ven, Andrew H.

    1985-01-01

    This paper examines the selection, interaction, and systems approaches to fit in structural contingency theory. The concepts of fit evaluated may be applied not only to structural contingency theory but to contingency theories in general. (MD)

  15. 75 FR 22836 - Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan...

    Science.gov (United States)

    2010-04-30

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORW00000 L16100000.DO0000; HAG10-0117] Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  16. 40 CFR 112.3 - Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan.

    Science.gov (United States)

    2010-07-01

    ... § 112.1(b), you must prepare and implement a Plan within six months after you begin operations. (c) If... per day, or at the nearest field office if the facility is not so attended, and (2) Have the Plan... discharges as described in § 112.1(b) that are the result of natural disasters, acts of war, or terrorism...

  17. 78 FR 76852 - Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and...

    Science.gov (United States)

    2013-12-19

    ... Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In... Management Plan (RMP) and Draft Environmental Impact Statement (EIS), and by this notice is announcing the...

  18. Contingent Conspiracies: Art, Philosophy, Science

    DEFF Research Database (Denmark)

    Wilson, Alexander

    2013-01-01

    The question of whether creativity comes from being “open” or “closed” to contingent processes, deeply intersects art-historical discourse on authorship, style, technique and practice: from the Greek notion of the Daimon, through commedia dell'arte’s improvised styles and romanticism’s investment......, Hegel) contain a deeper tension between contingency and necessity, often revealed in correlate discussions of the sublime. But as artists find themselves returning again to a concern or care for contingency (a thread running through Heidegger, Levinas and Derrida) or the question how to conspire...... with contingency (Negarestani), they do so today with a new paradigm of scientific knowledge at their disposal. For science too has increasingly been forced to respond to the notion of contingency. Progressively discovering the ubiquity of non-linear dynamics, deterministic chaos and emergent complexity...

  19. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  20. Measuring parent time scarcity and fatigue as barriers to meal planning and preparation: quantitative scale development.

    Science.gov (United States)

    Storfer-Isser, Amy; Musher-Eizenman, Dara

    2013-03-01

    To examine the psychometric properties of 9 quantitative items that assess time scarcity and fatigue as parent barriers to planning and preparing meals for their children. A convenience sample of 342 parents of children aged 2-6 years completed a 20-minute online survey. Exploratory factor analysis was used to examine the factor structure and create summary scales. Internal consistency reliability and measures of construct and concurrent validity were assessed. Two scales were created based on the factor analysis: time and energy for meals and meal planning. Preliminary evidence suggests that both scales are reliable and valid. The time and energy for meals and meal planning scales can be completed quickly by busy and tired parents. As many children do not eat nutritious diets, a better understanding of the barriers that parents face is critical and may help inform interventions tailored to the needs of tired, busy parents. Copyright © 2013 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

  1. Contingent post-closure plan, hazardous waste management units at selected maintenance facilities, US Army National Training Center, Fort Irwin, California

    International Nuclear Information System (INIS)

    1992-01-01

    The National Training Center (NTC) at Fort Irwin, California, is a US Army training installation that provides tactical experience for battalion/task forces and squadrons in a mid- to high-intensity combat scenario. Through joint exercises with US Air Force and other services, the NTC also provides a data source for improvements of training doctrines, organization, and equipment. To meet the training and operational needs of the NTC, several maintenance facilities provide general and direct support for mechanical devices, equipment, and vehicles. Maintenance products used at these facilities include fuels, petroleum-based oils, lubricating grease, various degreasing solvents, antifreeze (ethylene glycol), transmission fluid, brake fluid, and hydraulic oil. Used or spent petroleum-based products generated at the maintenance facilities are temporarily accumulated in underground storage tanks (USTs), collected by the NTC hazardous waste management contractor (HAZCO), and stored at the Petroleum, Oil, and Lubricant (POL) Storage Facility, Building 630, until shipped off site to be recovered, reused, and/or reclaimed. Spent degreasing solvents and other hazardous wastes are containerized and stored on-base for up to 90 days at the NTC's Hazardous Waste Storage Facility, Building 703. The US Environmental Protection Agency (EPA) performed an inspection and reviewed the hazardous waste management operations of the NTC. Inspections indicated that the NTC had violated one or more requirements of Subtitle C of the Resource Conservation and Recovery Act (RCRA) and as a result of these violations was issued a Notice of Noncompliance, Notice of Necessity for Conference, and Proposed Compliance Schedule (NON) dated October 13, 1989. The following post-closure plan is the compliance-based approach for the NTC to respond to the regulatory violations cited in the NON

  2. Test plan for preparing the Rapid Transuranic Monitoring Laboratory for field deployment

    International Nuclear Information System (INIS)

    McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

    1994-04-01

    This plan describes experimental work that will be performed during fiscal year 1994 to prepare the Rapid Transuranic Monitoring Laboratory (RTML) for routine field use by US Department of Energy (DOE) Environmental Restoration and Waste Management programs. The RTML is a mobile, field-deployable laboratory developed at the Idaho National Engineering Laboratory (INEL) that provides a rapid, cost-effective means of characterizing and monitoring radioactive waste remediation sites for low-level radioactive contaminants. Analytical instruments currently installed in the RTML include an extended-range, germanium photon analysis spectrometer with an automatic sample changer; two, large-area, ionization chamber alpha spectrometers; and four alpha continuous air monitors. The RTML was field tested at the INEL during June 1993 in conjunction with the Buried Waste Integrated Demonstration's remote retrieval demonstration. The major tasks described in this test plan are to (a) evaluate the beta detectors for use in screening soil samples for 90 Sr, (b) upgrade the alpha spectral analysis software programs, and (c) upgrade the photon spectral analysis software programs

  3. Regulation Plans on Severe Accidents developed by KINS Severe Accident Regulation Preparation TFT

    International Nuclear Information System (INIS)

    Kim, Kyun Tae; Chung, Ku Young; Na, Han Bee

    2016-01-01

    Some nuclear power plants in Fukushima Daiichi site had lost their emergency reactor cooling function for long-time so the fuels inside the reactors were molten, and the integrity of containment was damaged. Therefore, large amount of radioactive material was released to environment. Because the social and economic effects of severe accidents are enormous, Korean Government already issued 'Severe Accident Policy' in 2001 which requires nuclear power plant operators to set up 'Quantitative Safety Goal', to do 'Probabilistic Safety Analysis', to install 'Severe Accident Countermeasures' and to make 'Severe Accident Management Plan'. After the Fukushima disaster, a Special Safety Inspection was performed for all operating nuclear power plants of Korea. The inspection team from industry, academia, and research institutes assessed Korean NPPs capabilities to cope with or respond to severe accidents and emergency situation caused by natural disasters such as a large earthquake or tsunami. As a result of the special inspection, about 50 action items were identified to increase the capability to cope with natural disaster and severe accidents. Nuclear Safety Act has been amended to require NPP operators to submit Accident Management Plant as part of operating license application. The KINS Severe Accident Regulation Preparation TFT had first investigated oversea severe accident regulation trend before and after the Fukushima accident. Then, the TFT has developed regulation draft for severe accidents such as Severe accident Management Plans, the required design features for new NPPs to prevent severe accident against multiple failures and beyond-design external events, countermeasures to mitigate severe accident and to keep the integrity of containment, and assessment methodology on safety assessment plan and probabilistic safety assessment

  4. Regulation Plans on Severe Accidents developed by KINS Severe Accident Regulation Preparation TFT

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kyun Tae; Chung, Ku Young; Na, Han Bee [KINS, Daejeon (Korea, Republic of)

    2016-05-15

    Some nuclear power plants in Fukushima Daiichi site had lost their emergency reactor cooling function for long-time so the fuels inside the reactors were molten, and the integrity of containment was damaged. Therefore, large amount of radioactive material was released to environment. Because the social and economic effects of severe accidents are enormous, Korean Government already issued 'Severe Accident Policy' in 2001 which requires nuclear power plant operators to set up 'Quantitative Safety Goal', to do 'Probabilistic Safety Analysis', to install 'Severe Accident Countermeasures' and to make 'Severe Accident Management Plan'. After the Fukushima disaster, a Special Safety Inspection was performed for all operating nuclear power plants of Korea. The inspection team from industry, academia, and research institutes assessed Korean NPPs capabilities to cope with or respond to severe accidents and emergency situation caused by natural disasters such as a large earthquake or tsunami. As a result of the special inspection, about 50 action items were identified to increase the capability to cope with natural disaster and severe accidents. Nuclear Safety Act has been amended to require NPP operators to submit Accident Management Plant as part of operating license application. The KINS Severe Accident Regulation Preparation TFT had first investigated oversea severe accident regulation trend before and after the Fukushima accident. Then, the TFT has developed regulation draft for severe accidents such as Severe accident Management Plans, the required design features for new NPPs to prevent severe accident against multiple failures and beyond-design external events, countermeasures to mitigate severe accident and to keep the integrity of containment, and assessment methodology on safety assessment plan and probabilistic safety assessment.

  5. Mobile contingency unit

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Sergio O. da; Magalhaes, Milton P. de [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Junqueira, Rodrigo A.; Torres, Carlos A.R. [PETROBRAS Transporte S/A (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper is aimed at presenting what is already a reality in TRANSPETRO in the area covered by OSBRA, a pipeline that carries by-products to the Mid-West region of Brazil. In order to meet the needs of covering occasional accidents, TRANSPETRO counts on a standardized system of emergency management. It is a great challenge to secure an efficient communication along the 964 km of extension, considering that there are shadow zones where it is not possible to use conventional means of communication such as mobile telephony and internet. It was in this context that the Mobile Contingency Unit Via Satellite - MCU was developed, to extend the communication facilities existing in fixed installations to remote places, mainly the pipeline right of ways. In case of emergency, simulation and work in the pipeline right of way, MCU is fully able to provide the same data, voice, closed-circuit TV and satellite video conference facilities that are available in any internal area of the PETROBRAS system. (author)

  6. Contingency Analysis Post-Processing With Advanced Computing and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Glaesemann, Kurt; Fitzhenry, Erin

    2017-07-01

    Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

  7. Resource estimations in contingency planning for FMD

    DEFF Research Database (Denmark)

    Boklund, Anette; Sten, Mortensen; Holm Johansen, Maren

    Based on results from a stochastic simulation model, it was possible to create a simple model in excel to estimate the requirements for personnel and materiel during an FMD outbreak in Denmark. The model can easily be adjusted, when new information on resources appears from management of other cr...

  8. Continuity and Contingency in USAF Posture Planning

    Science.gov (United States)

    2016-01-01

    2007, and Daniel Gardner, Future Babble: Why Pundits Are Hedgehogs and Foxes Know Best, New York: Plume, 2012. 32 or demands considered most...New York: Harper Collins, 1997; and Gabriel Kolko, Anatomy of a War: Vietnam, the United States and the Modern Historical Experience, New York: The...Getler, “ Anatomy of a Failed Mission,” Washington Post, April 27, 1980. 202 Bacevich, 2005, p. 105. 203 Bacevich, 2005, pp. 106–17. Reagan also used

  9. Comparative analysis of the contingent of students of the correspondence form of teaching

    Directory of Open Access Journals (Sweden)

    О В Калмыкова

    2015-12-01

    Full Text Available The article examines the contingent of students of classical distance learning and online learning are the same, which prepares specialists in MESI, identifies features and conclusions are formulated for the development of online learning.

  10. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  11. 77 FR 13141 - Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource Management Plans...

    Science.gov (United States)

    2012-03-05

    ... Northrup, Project Manager, BLM Moab Field Office, 82 East Dogwood, Moab, UT 84532, telephone (435) 259-2151... Instruction Memorandum No. 2010-117. The MLP process will provide additional planning and analysis for areas... with varying mitigation levels for leasing. The planning area covers about 783,000 acres in east...

  12. Guide to oil spill exercise planning

    International Nuclear Information System (INIS)

    1996-01-01

    The International Convention on Oil Pollution Preparedness, Response and Cooperation (OPRC Convention) foresees a future in which all at risk states have national oil spill preparedness and response plans. The Convention also encourages the idea that national plans be developed in cooperation with oil and shipping industries. The ultimate test of any contingency plan is measured by performance in a real emergency. It is vital, therefore, that any programme for developing a national contingency plan must include an ongoing programme to test the plan through realistic exercises. An exercise programme must progressively prepare the Oil Spill Energy Response Team to perform effectively in realistic representations of the risks that the contingency plan has been designed to meet. This report has been designed to guide all those in government or industry who are faced with the responsibility of developing and managing oil spill response exercises at all levels. It carries with it the authority that derives from peer review by many centres of oil spill response excellence around the world. It is well-illustrated with brief case histories of exercises that have been carried out by many IPIECA member companies. Each of those companies has indicated its preparedness to share more information by providing contact name and address details within this report. (author)

  13. Lone Actor Terrorist Attack Planning and Preparation: A Data-Driven Analysis.

    Science.gov (United States)

    Schuurman, Bart; Bakker, Edwin; Gill, Paul; Bouhana, Noémie

    2017-10-23

    This article provides an in-depth assessment of lone actor terrorists' attack planning and preparation. A codebook of 198 variables related to different aspects of pre-attack behavior is applied to a sample of 55 lone actor terrorists. Data were drawn from open-source materials and complemented where possible with primary sources. Most lone actors are not highly lethal or surreptitious attackers. They are generally poor at maintaining operational security, leak their motivations and capabilities in numerous ways, and generally do so months and even years before an attack. Moreover, the "loneness" thought to define this type of terrorism is generally absent; most lone actors uphold social ties that are crucial to their adoption and maintenance of the motivation and capability to commit terrorist violence. The results offer concrete input for those working to detect and prevent this form of terrorism and argue for a re-evaluation of the "lone actor" concept. © 2017 The Authors. Journal of Forensic Sciences published by Wiley Periodicals, Inc. on behalf of American Academy of Forensic Sciences.

  14. A Plan-Do-Study-Act Approach to Improving Bowel Preparation Quality.

    Science.gov (United States)

    Calderwood, Audrey H; Mahoney, Elaine M; Jacobson, Brian C

    Up to 20% of patients presenting for colonoscopy have inadequate bowel cleanliness. In this study, the Plan-Do-Study-Act quality improvement process was used to improve bowel cleanliness among outpatients undergoing screening colonoscopy at Boston Medical Center. Rates of inadequate bowel cleanliness were assessed at baseline (April 2010 to September 2012), during several rapid-cycle experiments (October 2012 to September 2013), and through an observation phase (October 2013 to September 2015). The baseline rate of inadequate cleanliness was 9% with a target of 5%. Gap analysis identified 3 areas amenable to specific interventions: contacting patients, commitment to the procedure, and complexity and variation in instructions. Rates of inadequate cleanliness decreased to 4% at the end of the last intervention, but began rising for new reasons. Standardizing instructions and the use of navigators improved preparation quality. Bowel cleanliness is the end result of a multistep process with areas for improvement at many levels. Long-term monitoring is required to ensure ongoing success.

  15. 76 FR 62055 - Wabash Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2011-10-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-6-000] Wabash Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Wabash Gas Storage Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...

  16. 78 FR 79688 - Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2013-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF14-4-000] Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned 2015 Elko Area Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory...

  17. 76 FR 54758 - Alliance Pipeline L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-7-000] Alliance Pipeline L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Tioga Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission (FERC or...

  18. 75 FR 26220 - Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage...

    Science.gov (United States)

    2010-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Leader One Energy, LLC] Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage Project, Request for Comments on Environmental Issues, and Notice of a Site Visit April 30, 2010. The staff of the Federal Energy Regulatory Commission (FERC or...

  19. 75 FR 56089 - Equitrans, L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Sunrise...

    Science.gov (United States)

    2010-09-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-19-000] Equitrans, L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Sunrise Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting September 3, 2010. The staff of the Federal Energy Regulatory...

  20. 77 FR 37032 - Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2012-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-14-000] Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned JL 47 Loop Project, Request for Comments on Environmental Issues, and Notice of Onsite Review The staff of the Federal Energy Regulatory Commission (FERC or Commissio...

  1. 75 FR 19641 - Empire Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2010-04-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-5-000] Empire Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned Tioga County Extension Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting April 7, 2010. The staff of the Federal Energy...

  2. 76 FR 9327 - Gulf Spill Restoration Planning; Notice of Intent To Begin Restoration Scoping and Prepare a...

    Science.gov (United States)

    2011-02-17

    ... to compensate the public and the environment for loss of natural resources and services from the... Florida, as well as human uses of these resources. Natural Resource Damage Assessment (NRDA) is the... Restoration Planning; Notice of Intent To Begin Restoration Scoping and Prepare a Programmatic Environmental...

  3. A Strategic Plan of Academic Management System as Preparation for EAC Accreditation Visit--From UKM Perspective

    Science.gov (United States)

    Ab-Rahman, Mohammad Syuhaimi; Yusoff, Abdul Rahman Mohd; Abdul, Nasrul Amir; Hipni, Afiq

    2015-01-01

    Development of a robust platform is important to ensure that the engineering accreditation process can run smoothly, completely and the most important is to fulfill the criteria requirements. In case of Malaysia, the preparation for EAC (Engineering Accreditation Committee) assessment required a good strategic plan of academic management system…

  4. 75 FR 32962 - Notice of Intent To Prepare a Resource Management Plan for the Carlsbad Field Office, New Mexico...

    Science.gov (United States)

    2010-06-10

    ... To Prepare a Resource Management Plan for the Carlsbad Field Office, New Mexico and Associated Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY... associated Environmental Impact Statement (EIS) for the Carlsbad Field Office and by this notice is...

  5. 78 FR 35641 - Notice of Intent To Prepare an Amendment to the Mimbres Resource Management Plan and Associated...

    Science.gov (United States)

    2013-06-13

    ... Assessment for Possible Disposal of Public Land in Do[ntilde]a Ana County, Las Cruces, New Mexico AGENCY... Cruces District Office, New Mexico, intends to prepare a Resource Management Plan (RMP) Amendment with an associated Environmental Assessment (EA) to analyze the possible disposal by direct sale at fair market value...

  6. 77 FR 64824 - Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land Use Plan Amendment...

    Science.gov (United States)

    2012-10-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 049584, L51010000.FX0000.LVRWB09B3130] Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land Use Plan Amendment, and a Public Lands Segregation for the Proposed Soda Mountain Solar Project, CA AGENCY: Bureau of Land...

  7. Planning and Preparation for CD-ROM Implementation: The Citadel Library.

    Science.gov (United States)

    Maynard, J. Edmund

    Management guidelines for library planning and a strategic planning program profile based on the literature were used in the planning process for implementing access to databases on CD-ROM at the Daniel Library of the Citadel, Military College of South Carolina. According to this model, the planning process would consist of five stages: (1)…

  8. Speech Timing Deficit of Stuttering: Evidence from Contingent Negative Variations.

    Directory of Open Access Journals (Sweden)

    Ning Ning

    Full Text Available The aim of the present study was to investigate the speech preparation processes of adults who stutter (AWS. Fifteen AWS and fifteen adults with fluent speech (AFS participated in the experiment. The event-related potentials (ERPs were recorded in a foreperiod paradigm. The warning signal (S1 was a color square, and the following imperative stimulus (S2 was either a white square (the Go signal that required participants to name the color of S1 or a white dot (the NoGo signal that prevents participants from speaking. Three differences were found between AWS and AFS. First, the mean amplitude of the ERP component parietal positivity elicited by S1 (S1-P3 was smaller in AWS than in AFS, which implies that AWS may have deficits in investing working memory on phonological programming. Second, the topographic shift from the early phase to the late phase of contingent negative variation occurred earlier for AWS than for AFS, thus suggesting that the motor preparation process is promoted in AWS. Third, the NoGo effect in the ERP component parietal positivity elicited by S2 (S2-P3 was larger for AFS than for AWS, indicating that AWS have difficulties in inhibiting a planned speech response. These results provide a full picture of the speech preparation and response inhibition processes of AWS. The relationship among these three findings is discussed. However, as stuttering was not manipulated in this study, it is still unclear whether the effects are the causes or the results of stuttering. Further studies are suggested to explore the relationship between stuttering and the effects found in the present study.

  9. Contingency interim measure for the public water supply at Barnes, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2009-07-09

    This document presents a conceptual design for a contingency interim measure (IM) for treatment of the public water supply system at Barnes, Kansas, should this become necessary. The aquifer that serves the public water supply system at Barnes has been affected by trace to low concentrations of carbon tetrachloride and its degradation product, chloroform. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory (Argonne 2008a) have demonstrated that groundwater at the Barnes site is contaminated with carbon tetrachloride at concentrations exceeding the Kansas Tier 2 risk-based screening level (RBSL) and the EPA maximum contaminant level (MCL) of 5.0 {micro}g/L for this compound. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) formerly operated a grain storage facility in Barnes, approximately 800 ft east-southeast of the public water supply wells. Carbon tetrachloride was used in the treatment of grain. Another potential source identified in an investigation conducted for the KDHE (PRC 1996) is the site of a former agriculture building owned by the local school district (USD 223). This building is located immediately east of well PWS3. The potential contingency IM options evaluated in this report include the treatment of groundwater at the public water supply wellheads and the provision of an alternate water supply via Washington County Rural Water District No.2 (RWD 2). This document was developed in accordance with KDHE Bureau of Environmental Remediation (BER) Policy No.BER-RS-029 (Revised) (KDHE 2006a), supplemented by guidance from the KDHE project manager. Upon the approval of this contingency IM conceptual design by the KDHE, the CCC/USDA will prepare a treatment system design document that will contain the following elements: (1) Description of the approved contingency IM treatment method; (2) Drawings and/or schematics provided by the contractor and/or manufacturer of the approved technology; (3) A

  10. Inevitability, contingency, and epistemic humility.

    Science.gov (United States)

    Kidd, Ian James

    2016-02-01

    This paper offers an epistemological framework for the debate about whether the results of scientific enquiry are inevitable or contingent. I argue in Sections 2 and 3 that inevitabilist stances are doubly guilty of epistemic hubris--a lack of epistemic humility--and that the real question concerns the scope and strength of our contingentism. The latter stages of the paper-Sections 4 and 5-address some epistemological and historiographical worries and sketch some examples of deep contingencies to guide further debate. I conclude by affirming that the concept of epistemic humility can usefully inform critical reflection on the contingency of the sciences and the practice of history of science. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Contingent Employment in the Netherlands

    OpenAIRE

    Pot, F.; Koene, Bas; Paauwe, Jaap

    2001-01-01

    textabstractIn the last decade the Dutch labour market has demonstrated an admirable capacity to generate jobs. Consequently, the unemployment rate has significantly decreased. However, the newly generated jobs are a-typical in the sense that they are not full-time jobs based on open-ended contracts. Instead, the job growth has relied on the growth of part-time and contingent jobs. While the creation of part-time jobs seems to be employee-driven, contingent employment, in contrast, seems to b...

  12. Preparation of waste analysis plans under the Resource Conservation and Recovery Act (Interim guidance)

    International Nuclear Information System (INIS)

    1993-03-01

    This document is organized to coincide with the suggested structure of the actual Waste Analysis Plans (WAP) discussed in the previous section. The contents of the remaining eleven chapters and appendices that comprise this document are described below: Chapter 2 addresses waste streams, test parameters, and rationale for sampling and analytical method selection; test methods for analyzing parameters; proceduresfor collecting representative samples; and frequency of sample collection and analyses. These are the core WAP requirements. Chapter 3 addresses analysis requirements for waste received from off site. Chapter 4addresses additional requirements for ignitable, reactive, or incompatible wastes. Chapter 5 addresses unit-specific requirements. Chapter 6 addresses special procedures for radioactive mixed waste. Chapter 7 addresses wastes subject to the land disposal restrictions. Chapter 8 addresses QA/QC procedures. Chapter 9 compares the waste analysis requirements of an interim status facility with those of a permitted facility. Chapter 10 describes the petition process required for sampling and analytical procedures to deviate from accepted methods, such as those identified in promulgated regulations. Chapter 11 reviews the process for modification of WAPs as waste type or handling practices change at a RCRA permitted TSDF. Chapter 12 is the list of references that were used in the preparation of this guidance. Appendix A is a sample WAP addressing physical/chemical treatment and container storage. Appendix B is a sample WAP addressing an incinerator and tank systems. Appendix C discusses the relationship of the WAP to other permitting requirements and includes specific examples of how waste analysis is used to comply with certain parts of a RCRA permit. Appendix D contains the exact wording for the notification/certification requirements under theland disposal restrictions

  13. Telemedicine consulting in the patient preparation and planning of prosthetic tooth replacement

    Directory of Open Access Journals (Sweden)

    Mladenović Dragan

    2013-01-01

    Full Text Available Introduction. In the management of edentulous spaces, there is a permanent need of a dentist-prosthetician in charge to consult other specialists. Modern telemedicine, based on powerful computer and telecomunication systems, offers an adequate answer to these challenges, being able to transfer and obtain clinical data and consultation information over large distances. Using smartphone or a computer, the teleconsultant acces the system, downloads and review the data and photographs and gave suggestions. The system then enables direct, real time contact with the consultant, chat, or directs them to contact each other by phone. Case report. We presented telemedicine consulting in the patient preparation and planning of prosthetic tooth replacement in 3 cases with different teleconsultation requirements: the first case for prosthetic rehabilitation of his upper teeth, the second one for prosthetic management of his partial edentulousness and “a growth on his gums” in the vestibular region of the frontal teeth and the third one for prosthetic management of total edentulousness of her upper jaw. We used the system of telemedicine in dentistry, established at the Faculty of Medicine in Kosovska Mitrovica. The operation was based on the computer application system XPA3 Online, computer networking and mobile smartphone network. All consultations were succefull with no need for further procedures in regional center. Conclusion. The use of a mobile smartphone has brought about the mobility and availability of teleconsultant specialists in an extent never seen before. Prostheticians are thus able to offer better service to their patients and improve the quality of management of partially or totally edentulous patients, especially in rural areas.

  14. Telemedicine consulting in the patient preparation and planning of prosthetic tooth replacement.

    Science.gov (United States)

    Mladenović, Dragan; Tosić, Goran; Zivković, Dusan; Djindjić, Natasa; Mladenović, Lidija; Mladenović, Sanja; Marković, Ivana

    2013-09-01

    In the management of edentulous spaces, there is a permanent need of a dentist-prosthetician in charge to consult other specialists. Modern telemedicine, based on powerful computer and telecomunication systems, offers an adequate answer to these challenges, being able to transfer and obtain clinical data and consultation information over large distances. Using smartphone or a computer, the teleconsultant acces the system, downloads and review the data and photographs and gave suggestions. The system then enables direct, real time contact with the consultant, chat, or directs them to contact each other by phone. We presented telemedicine consulting in the patient preparation and planning of prosthetic tooth replacement in 3 cases with different teleconsultation requirements: the first case for prosthetic rehabilitation of his upper teeth, the second one for prosthetic management of his partial edentulousness and "a growth on his gums" in the vestibular region of the frontal teeth and the third one for prosthetic management of total edentulousness of her upper jaw. We used the system of telemedicine in dentistry, established at the Faculty of Medicine in Kosovska Mitrovica. The operation was based on the computer application system XPA3 Online, computer networking and mobile smartphone network. All consultations were succefull with no need for further procedures in regional center. The use of a mobile smartphone has brought about the mobility and availability of teleconsultant specialists in an extent never seen before. Prostheticians are thus able to offer better service to their patients and improve the quality of management of partially or totally edentulous patients, especially in rural areas.

  15. The Flexible Solar Utility. Preparing for Solar's Impacts to Utility Planning and Operations

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, John [Solar Electric Power Association (SEPA), Washington, DC (United States); Davidovich, Ted [Solar Electric Power Association (SEPA), Washington, DC (United States); Cory, Karlynn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Aznar, Alexandra [National Renewable Energy Lab. (NREL), Golden, CO (United States); McLaren, Joyce [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This paper seeks to provide a flexible utility roadmap for identifying the steps that need to be taken to place the utility in the best position for addressing solar in the future. Solar growth and the emergence of new technologies will change the electric utility of tomorrow. Although not every utility, region, or market will change in the same way or magnitude, developing a path forward will be needed to reach the Electric System of the Future in the coming decades. In this report, a series of potential future states are identified that could result in drastically different energy mixes and profiles: 1) Business as Usual, 2) Low Carbon, Centralized Generation, 3) Rapid Distributed Energy Resource Growth, 4) Interactivity of Both the Grid and Demand, and 5) Grid or Load Defection. Complicating this process are a series of emerging disruptions; decisions or events that will cause the electric sector to change. Understanding and preparing for these items is critical for the transformation to any of the future states to be successful. Predicting which future state will predominate 15 years from now is not possible; however, utilities still will need to look ahead and try to anticipate how factors will impact their planning, operations, and business models. In order to dig into the potential transformations facing the utility industry, the authors conducted a series of utility interviews, held a working session at a major industry solar conference, and conducted a quantitative survey. To focus conversations, the authors leveraged the Rapid Distributed Energy Resource (DER) Growth future to draw out how utilities would have to adapt from current processes and procedures in order to manage and thrive in that new environment. Distributed solar was investigated specifically, and could serve as a proxy resource for all distributed generation (DG). It can also provide the foundation for all DERs.

  16. Being Prepared for Climate Change: A Workbook for Developing Risk-Based Adaptation Plans

    Science.gov (United States)

    This workbook is a guide for environmental professionals to construct a climate change adaptation plan based on identifying risks and their consequences. It incorporates watershed management, vulnerability assessments and action planning.

  17. Contingency Theories of Leadership: A Study.

    Science.gov (United States)

    Saha, Sunhir K.

    1979-01-01

    Some of the major contingency theories of leadership are reviewed; some results from the author's study of Fiedler's contingency model are reported; and some thoughts for the future of leadership research are provided. (Author/MLF)

  18. Breakdown concepts for contingency tables

    NARCIS (Netherlands)

    Kuhnt, S.

    2010-01-01

    Loglinear Poisson models are commonly used to analyse contingency tables. So far, robustness of parameter estimators as well as outlier detection have rarely been treated in this context. We start with finite-sample breakdown points. We yield that the breakdown point of mean value estimators

  19. Lessons in Contingent, Recursive Humility

    Science.gov (United States)

    Vagle, Mark D.

    2011-01-01

    In this article, the author argues that critical work in teacher education should begin with teacher educators turning a critical eye on their own practices. The author uses Lesko's conception of contingent, recursive growth and change to analyze a lesson he observed as part of a phenomenological study aimed at understanding more about what it is…

  20. Job satisfaction and contingent employment

    NARCIS (Netherlands)

    de Graaf-Zijl, M.

    2012-01-01

    This paper analyses job satisfaction as an aggregate of satisfaction with several job aspects, with special focus on the influence of contingent-employment contracts. Fixed-effect analysis is applied on a longitudinal sample of Dutch employees in four work arrangements: regular, fixed-term, on-call

  1. A Profile of Contingent Workers.

    Science.gov (United States)

    Polivka, Anne E.

    1996-01-01

    Based on data from the supplement to the February 1995 Current Population Survey, contingent workers were more likely to be female, black, young, enrolled in school, and employed in services and construction industries than were noncontingent workers. More than 10% were teachers. (Author)

  2. How Precarious Is Contingent Work?

    DEFF Research Database (Denmark)

    Scheuer, Steen

    2015-01-01

    agree. This study focuses on a number of non-pay conditions for contingent employees, compared to permanent staff, under the assumption that these conditions are cumulatively negative. The article is based on utilizes a survey of app.4,900 employees (response rate 57%), asking questions concerning...

  3. Some guidance on preparing validation plans for the DART Full System Models.

    Energy Technology Data Exchange (ETDEWEB)

    Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy (Sandia National Laboratories, Albuquerque, NM)

    2009-03-01

    Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.

  4. 48 CFR 18.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contingency operation. 18... METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 18.201 Contingency operation. (a) Contingency operation is defined in 2.101. (b) Micro-purchase threshold. The threshold...

  5. 48 CFR 218.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contingency operation. 218... Flexibilities 218.201 Contingency operation. (1) Selection, appointment, and termination of appointment... in a contingency contracting force. See 201.603-2(2). (2) Policy for unique item identification...

  6. Fuzzy-set based contingency ranking

    International Nuclear Information System (INIS)

    Hsu, Y.Y.; Kuo, H.C.

    1992-01-01

    In this paper, a new approach based on fuzzy set theory is developed for contingency ranking of Taiwan power system. To examine whether a power system can remain in a secure and reliable operating state under contingency conditions, those contingency cases that will result in loss-of-load, loss-of generation, or islanding are first identified. Then 1P-1Q iteration of fast decoupled load flow is preformed to estimate post-contingent quantities (line flows, bus voltages) for other contingency cases. Based on system operators' past experience, each post-contingent quantity is assigned a degree of severity according to the potential damage that could be imposed on the power system by the quantity, should the contingency occurs. An approach based on fuzzy set theory is developed to deal with the imprecision of linguistic terms

  7. Guide for prepare the plan for radiological emergency by the users of ionizing radiation sources

    International Nuclear Information System (INIS)

    1992-01-01

    The Radiological Emergency Plan foresees all the possible radiological accidents with the ionizing sources the entity is using. The measures should be adopted by every factor is supped to take part in the emergencies created. The effectiveness of the guaranteed. THis guide establishes the model for elaborating the radiological Emergency Plans

  8. Effective operational oil spill response planning

    International Nuclear Information System (INIS)

    Meyers, R.J.

    1991-01-01

    An operational Contingency Plan is one of the single most important aspects of effective oil spill response operations. It is a spill control game plan. A thorough contingency plan provides a set of guidelines that can be used to help direct all phases of spill response activities. More than simple a compilation of lists and rosters, the contingency plan reflects strategic and philosophical elements of spill response that help to ensure a viable response to any spill incident. Facilities and oil carrying vessels should have well maintained contingency plans with these features. This paper describes the requirement for effective oil spill response pans and the training required to exercise them

  9. Counterfactual reasoning for regretted situations involving controllable versus uncontrollable events: the modulating role of contingent self-esteem.

    Science.gov (United States)

    Wilkinson, Meredith R; Ball, Linden J; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person's sense of self-worth is based on self and others' expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future.

  10. Counterfactual Reasoning for Regretted Situations Involving Controllable Versus Uncontrollable Events: The Modulating Role of Contingent Self-Esteem

    Science.gov (United States)

    Wilkinson, Meredith R.; Ball, Linden J.; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person’s sense of self-worth is based on self and others’ expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future. PMID:25883697

  11. Contingent factors affecting network learning

    OpenAIRE

    Peters, Linda D.; Pressey, Andrew D.; Johnston, Wesley J.

    2016-01-01

    To increase understanding of the impact of individuals on organizational learning processes, this paper explores the impact of individual cognition and action on the absorptive capacity process of the wider network. In particular this study shows how contingent factors such as social integration mechanisms and power relationships influence how network members engage in, and benefit from, learning. The use of cognitive consistency and sensemaking theory enables examination of how these conting...

  12. Technical basis for the preparation of emergency plans relating to pressurized water reactors

    International Nuclear Information System (INIS)

    L'Homme, A.; Manesse, D.; Gauvain, J.; Crabol, B.

    1989-01-01

    The paper begins by summarizing the standard French approach to management of severe accidents at PWR plants. It goes on to define the source term used as a general basis for emergency plans for protection of the civil population. The paper describes the impact this source term has on both the site and the environment, which is subsequently used as a technical basis for determining the response of the utility and the public authorities concerned. The discussion concludes with a brief outline of the current status of various emergency plans and a description of additional work currently in progress and aimed at improving these plans [fr

  13. Suited Contingency Ops Food - 2

    Science.gov (United States)

    Glass, J. W.; Leong, M. L.; Douglas, G. L.

    2014-01-01

    The contingency scenario for an emergency cabin depressurization event may require crewmembers to subsist in a pressurized suit for up to 144 hours. This scenario requires the capability for safe nutrition delivery through a helmet feed port against a 4 psi pressure differential to enable crewmembers to maintain strength and cognition to perform critical tasks. Two nutritional delivery prototypes were developed and analyzed for compatibility with the helmet feed port interface and for operational effectiveness against the pressure differential. The bag-in-bag (BiB) prototype, designed to equalize the suit pressure with the beverage pouch and enable a crewmember to drink normally, delivered water successfully to three different subjects in suits pressurized to 4 psi. The Boa restrainer pouch, designed to provide mechanical leverage to overcome the pressure differential, did not operate sufficiently. Guidelines were developed and compiled for contingency beverages that provide macro-nutritional requirements, a minimum one-year shelf life, and compatibility with the delivery hardware. Evaluation results and food product parameters have the potential to be used to improve future prototype designs and develop complete nutritional beverages for contingency events. These feeding capabilities would have additional use on extended surface mission EVAs, where the current in-suit drinking device may be insufficient.

  14. Improving the effectiveness of planning EIA (PEIA) in China: Integrating planning and assessment during the preparation of Shenzhen's Master Urban Plan

    International Nuclear Information System (INIS)

    Che Xiuzhen; English, Alex; Lu Jia; Chen, Yongqin David

    2011-01-01

    The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully and rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: ·as a tool and process for achieving more sustainable and strategic planning; ·to determine the level of integration of SEA within the planning system; and, ·its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.

  15. Some Tests for Evaluation of Contingency Tables (for Biomedical Applications)

    Czech Academy of Sciences Publication Activity Database

    Kalina, Jan

    2011-01-01

    Roč. 7, č. 1 (2011), s. 37-50 ISSN 1336-9180 R&D Projects: GA MŠk(CZ) 1M06014 Institutional research plan: CEZ:AV0Z10300504 Keywords : contingency tables * hypothesis testing Subject RIV: BB - Applied Statistics , Operational Research http://jamsi.fpv.ucm.sk/docs/v07n01_05_2011/v07_n01_03_KALINA.pdf

  16. Text Linguistics in Research Papers Prepared by University Students: Teaching through Lesson Plans and Textbooks

    Directory of Open Access Journals (Sweden)

    Manuel Albarrán-Santiago

    2015-01-01

    Full Text Available This research project revolves around the properties of text linguistics under a qualitative approach.  The author analyzed drafts of a research paper by two university students as well as lesson plans and textbooks of high school Spanish Language and Literature courses and lesson plans of courses from the Licentiate degree in Education.  According to the information from the drafts, students struggle with coherence and cohesion in writing; however, they succeed in choosing the correct language for the type of writing.  Difficulties are most likely due to fact that this topic is not included in secondary education plans and is not commonly addressed in textbooks or university classes.  In conclusion, teachers should include the properties of text linguistics in their lesson plans in order to help students overcome these difficulties.

  17. 76 FR 37145 - Notice of Intent To Prepare a Resource Management Plan Amendment (RMPA) and Associated...

    Science.gov (United States)

    2011-06-24

    ... provided in BLM Land Use Planning Handbook (H-1601-1). The Lease Application Areas total approximately 2..., and tribal governments; develop reasonable and sound alternatives; use current scientific data to...

  18. Retirement Planning: Important Factors Influencing a Service Member’s Decision to Prepare for Retirement

    Science.gov (United States)

    2017-12-01

    sector had a defined benefit pension plan. However, in the 1980s, due to the high cost of funding defined benefit plans, corporations began to favor a...rate in February 2017 was 5.6%. Dave Ramsey (n.d.), a personal finance expert, recommends individuals save at least 15% of their income for retirement...is explicitly clear that “service members are responsible for their personal finances ” (DOD, 2012, p. 15). The FRS offers personal financial

  19. Welfare and evacuation sub-plan: APTCARE - Lucas Heights

    International Nuclear Information System (INIS)

    1985-11-01

    This Sub-plan has been prepared as a contingency plan to the APTCARE document - A plan to cope with an accident at the Australian Atomic Energy Commission's Research Establishment at Lucas Heights. It details procedures to be followed for the evacuation and welfare of citizens residing in areas outside the Commission's establishment in the event that their health or safety is threatened by reason of an accident at the nuclear reactor facility which could have off-site implications. Additionally, it lists roles and tasking assignments of various counter-disaster response and support agencies in such an occurrence

  20. Preparation of a program for the independent verification of the brachytherapy planning systems calculations

    International Nuclear Information System (INIS)

    V Carmona, V.; Perez-Calatayud, J.; Lliso, F.; Richart Sancho, J.; Ballester, F.; Pujades-Claumarchirant, M.C.; Munoz, M.

    2010-01-01

    In this work a program is presented that independently checks for each patient the treatment planning system calculations in low dose rate, high dose rate and pulsed dose rate brachytherapy. The treatment planning system output text files are automatically loaded in this program in order to get the source coordinates, the desired calculation point coordinates and the dwell times when it is the case. The source strength and the reference dates are introduced by the user. The program allows implementing the recommendations about independent verification of the clinical brachytherapy dosimetry in a simple and accurate way, in few minutes. (Author).

  1. Planning and preparing for emergency response to transport accidents involving radioactive material. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    The objective of this Safety Guide is to provide guidance to the public authorities and others (including consignors, carriers and emergency response authorities) who are responsible for developing and establishing emergency arrangements for dealing effectively and safely with transport accidents involving radioactive material. It may assist those concerned with establishing the capability to respond to such transport emergencies. It provides guidance for those Member States whose involvement with radioactive material is just beginning. It also provides guidance for those Member States that have already developed their radioactive material industries and the attendant emergency plans but that may need to review and improve these plans

  2. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY I QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  3. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY IV QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  4. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY III QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  5. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY II QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  6. Master Plan for Tennessee Schools: Preparing for the 21st Century.

    Science.gov (United States)

    Tennessee State Board of Education, Nashville.

    The Education Improvement Act (EIA) was passed in Tennessee in 1992. It established the Basic Education Program (BEP) as the funding formula used to provide adequate, equitable, and sustainable school funding. The 1997 master plan is consistent with the national Goals 2000 legislation and addresses each of the eight national goals. The plan…

  7. Master Plan for Tennessee Schools, 1995: Preparing for the 21st Century.

    Science.gov (United States)

    Tennessee State Board of Education, Nashville.

    The Tennessee State Legislature passed the Education Improvement Act (EIA) in 1992, which established the Basic Education Program (BEP) as the funding formula for providing adequate, equitable, and sustainable school funding. This document presents the 1995 Master Plan for Tennessee Schools, which focuses on the priority issues that must be…

  8. National technology needs assessment for the preparation and implementation of climate change action plans

    Energy Technology Data Exchange (ETDEWEB)

    Berkel, C.W.M. van; Blonk, T.J.; Westra, C.A.

    1996-12-31

    In the United National Framework Convention on Climate Change (FCCC) it is recognised that developed countries have a responsibility in assisting developing countries and countries in economic transition in building a national capacity for the development, acquisition and transfer of Climate-related Technologies (CTs). Such assistance is most likely to be successful once it is tailored to the results of a sound assessment of the country`s development needs and once the results of this assessment have been endorsed by the most important stakeholders in the country. Recent insight in the opportunities and constraints for National (technology) Needs Assessments (NNAs) as planning tool for both capacity building and technology transfer regarding Environmentally Sound Technologies (ESTs) is applied here to propose a participatory Climate Change Action Planning (CCAP) process. This participatory planning process is thought to serve the dual objective of defining a national Climate Change Action Plan (CCAP) while at the same time contributing to the creation of a broad supportive basis for its acceptance and implementation among stakeholders in the developing country.

  9. Pavlovian contingencies and temporal information.

    Science.gov (United States)

    Balsam, Peter D; Fairhurst, Stephen; Gallistel, Charles R

    2006-07-01

    The effects of altering the contingency between the conditioned stimulus (CS) and the unconditioned stimulus (US) on the acquisition of autoshaped responding was investigated by changing the frequency of unsignaled USs during the intertrial interval. The addition of the unsignaled USs had an effect on acquisition speed comparable with that of massing trials. The effects of these manipulations can be understood in terms of their effect on the amount of information (number of bits) that the average CS conveys to the subject about the timing of the next US. The number of reinforced CSs prior to acquisition is inversely related to the information content of the CS.

  10. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  11. Standard Guide for Preparing Waste Management Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide addresses the development of waste management plans for potential waste streams resulting from decommissioning activities at nuclear facilities, including identifying, categorizing, and handling the waste from generation to final disposal. 1.2 This guide is applicable to potential waste streams anticipated from decommissioning activities of nuclear facilities whose operations were governed by the Nuclear Regulatory Commission (NRC) or Agreement State license, under Department of Energy (DOE) Orders, or Department of Defense (DoD) regulations. 1.3 This guide provides a description of the key elements of waste management plans that if followed will successfully allow for the characterization, packaging, transportation, and off-site treatment or disposal, or both, of conventional, hazardous, and radioactive waste streams. 1.4 This guide does not address the on-site treatment, long term storage, or on-site disposal of these potential waste streams. 1.5 This standard does not purport to address ...

  12. Assessment of Understanding: Student Teachers' Preparation, Implementation and Reflection of a Lesson Plan for Science

    Science.gov (United States)

    Juhler, Martin Vogt

    2017-05-01

    Research finds that student teachers often fail to make observable instructional goals, without which a secure bridge between instruction and assessment is precluded. This is one reason that recent reports state that teacher education needs to become better at helping student teachers to develop their thinking about and skills in assessing pupils' learning. Currently in Europe, the Lesson Study method and the Content Representation tool, which both have a specific focus on assessment, have started to address this problem. This article describes and discusses an intervention in which Lesson Study was used in combination with Content Representation in student teachers' field practice. Empirical materials from one group of student teachers were analyzed to illustrate how the student teachers worked with assessment during the planning of a lesson, how they implemented it in a research lesson, and how they used the gathered observations to make claims about assessment aims. The findings suggest that the student teachers placed greater emphasis on assessment through the intervention. However, it is also found that more attention should have been dedicated to the planning phase and that the group did not manage to keep a research focus throughout the Lesson Study process. This suggests that it properly would be beneficial with several planning sessions prior to the research lesson, as well as having an expert teacher leading the Lesson Study.

  13. Improving advance care planning for English-speaking and Spanish-speaking older adults: study protocol for the PREPARE randomised controlled trial

    OpenAIRE

    Sudore, RL; Barnes, DE; Le, GM; Ramos, R; Osua, SJ; Richardson, SA; Boscardin, J; Schillinger, D

    2016-01-01

    Introduction Advance care planning (ACP) is a process that allows patients to identify their goals for medical care. Traditionally, ACP has focused on completing advance directives; however, we have expanded the ACP paradigm to also prepare patients to communicate their wishes and make informed decisions. To this end, we created an ACP website called PREPARE (http://www.prepareforyourcare.org) to prepare diverse English-speaking and Spanish-speaking older adults for medical decision-making. H...

  14. Contingent Diversity on Anthropic Landscapes

    Directory of Open Access Journals (Sweden)

    William Balée

    2010-02-01

    Full Text Available Behaviorally modern human beings have lived in Amazonia for thousands of years. Significant dynamics in species turnovers due to human-mediated disturbance were associated with the ultimate emergence and expansion of agrarian technologies in prehistory. Such disturbances initiated primary and secondary landscape transformations in various locales of the Amazon region. Diversity in these locales can be understood by accepting the initial premise of contingency, expressed as unprecedented human agency and human history. These effects can be accessed through the archaeological record and in the study of living languages. In addition, landscape transformation can be demonstrated in the study of traditional knowledge (TK. One way of elucidating TK distinctions between anthropic and nonanthropic landscapes concerns elicitation of differential labeling of these landscapes and more significantly, elicitation of the specific contents, such as trees, occurring in these landscapes. Freelisting is a method which can be used to distinguish the differential species compositions of landscapes resulting from human-mediated disturbance vs. those which do not evince records of human agency and history. The TK of the Ka’apor Indians of Amazonian Brazil as revealed in freelisting exercises shows differentiation of anthropogenic from high forests as well as a recognition of diversity in the anthropogenic forests. This suggests that the agents of human-mediated disturbance and landscape transformation in traditional Amazonia encode diversity and contingency into their TK, which encoding reflects past cultural influence on landscape and society over time.

  15. Preparing diagnostic 3D images for image registration with planning CT images

    International Nuclear Information System (INIS)

    Tracton, Gregg S.; Miller, Elizabeth P.; Rosenman, Julian; Chang, Sha X.; Sailer, Scott; Boxwala, Azaz; Chaney, Edward L.

    1997-01-01

    Purpose: Pre-radiotherapy (pre-RT) tomographic images acquired for diagnostic purposes often contain important tumor and/or normal tissue information which is poorly defined or absent in planning CT images. Our two years of clinical experience has shown that computer-assisted 3D registration of pre-RT images with planning CT images often plays an indispensable role in accurate treatment volume definition. Often the only available format of the diagnostic images is film from which the original 3D digital data must be reconstructed. In addition, any digital data, whether reconstructed or not, must be put into a form suitable for incorporation into the treatment planning system. The purpose of this investigation was to identify all problems that must be overcome before this data is suitable for clinical use. Materials and Methods: In the past two years we have 3D-reconstructed 300 diagnostic images from film and digital sources. As a problem was discovered we built a software tool to correct it. In time we collected a large set of such tools and found that they must be applied in a specific order to achieve the correct reconstruction. Finally, a toolkit (ediScan) was built that made all these tools available in the proper manner via a pleasant yet efficient mouse-based user interface. Results: Problems we discovered included different magnifications, shifted display centers, non-parallel image planes, image planes not perpendicular to the long axis of the table-top (shearing), irregularly spaced scans, non contiguous scan volumes, multiple slices per film, different orientations for slice axes (e.g. left-right reversal), slices printed at window settings corresponding to tissues of interest for diagnostic purposes, and printing artifacts. We have learned that the specific steps to correct these problems, in order of application, are: Also, we found that fast feedback and large image capacity (at least 2000 x 2000 12-bit pixels) are essential for practical application

  16. 48 CFR 1318.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contingency operation. 1318.201 Section 1318.201 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 1318.201 Contingency...

  17. 7 CFR 457.9 - Appropriation contingency.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Appropriation contingency. 457.9 Section 457.9 Agriculture Regulations of the Department of Agriculture (Continued) FEDERAL CROP INSURANCE CORPORATION, DEPARTMENT OF AGRICULTURE COMMON CROP INSURANCE REGULATIONS § 457.9 Appropriation contingency...

  18. Reporting, Recording, and Transferring Contingency Demand Data

    National Research Council Canada - National Science Library

    Smith, Bernard

    2000-01-01

    .... In this report, we develop a standard set of procedures for reporting and recording demand data at the contingency location and transferring contingency demand data to the home base - ensuring proper level allocation and valid worldwide peacetime operating stock (POS) and readiness spares package (RSP) requirements.

  19. Contingent and Alternative Work Arrangements, Defined.

    Science.gov (United States)

    Polivka, Anne E.

    1996-01-01

    Discusses the definitions of contingent workers and alternative work arrangements used by the Bureau of Labor Statistics to analyze data, and presents aggregate estimates of the number of workers in each group. Discusses the overlap between contingent workers and workers in alternative arrangements. (Author/JOW)

  20. Contingency management: perspectives of Australian service providers.

    Science.gov (United States)

    Cameron, Jacqui; Ritter, Alison

    2007-03-01

    Given the very positive and extensive research evidence demonstrating efficacy and effectiveness of contingency management, it is important that Australia explore whether contingency management has a role to play in our own treatment context. Qualitative interviews were conducted with 30 experienced alcohol and drug practitioners, service managers and policy-makers in Victoria. Interviewees were selected to represent the range of drug treatment services types and included rural representation. A semi-structured interview schedule, covering their perceptions and practices of contingency management was used. All interviews were transcribed verbatim and analysed using N2 qualitative data analysis program. The majority of key informants were positively inclined toward contingency management, notwithstanding some concerns about the philosophical underpinnings. Concerns were raised in relation to the use of monetary rewards. Examples of the use of contingency management provided by key informants demonstrated an over-inclusive definition: all the examples did not adhere to the key principles of contingency management. This may create problems if a structured contingency management were to be introduced in Australia. Contingency management is an important adjunctive treatment intervention and its use in Australia has the potential to enhance treatment outcomes. No unmanageable barriers were identified in this study.

  1. Contingent Attentional Capture by Conceptually Relevant Images

    Science.gov (United States)

    Wyble, Brad; Folk, Charles; Potter, Mary C.

    2013-01-01

    Attentional capture is an unintentional shift of visuospatial attention to the location of a distractor that is either highly salient, or relevant to the current task set. The latter situation is referred to as contingent capture, in that the effect is contingent on a match between characteristics of the stimuli and the task-defined…

  2. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  3. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A. [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  4. Thevenin Equivalent Method for Dynamic Contingency Assessment

    DEFF Research Database (Denmark)

    Møller, Jakob Glarbo; Jóhannsson, Hjörtur; Østergaard, Jacob

    2015-01-01

    A method that exploits Thevenin equivalent representation for obtaining post-contingency steady-state nodal voltages is integrated with a method of detecting post-contingency aperiodic small-signal instability. The task of integrating stability assessment with contingency assessment is challenged...... by the cases of unstable post-contingency conditions. For unstable postcontingency conditions there exists no credible steady-state which can be used for basis of a stability assessment. This paper demonstrates how Thevenin Equivalent methods can be applied in algebraic representation of such bifurcation...... points which may be used in assessment of post-contingency aperiodic small-signal stability. The assessment method is introduced with a numeric example....

  5. Historical Contingency in Controlled Evolution

    Science.gov (United States)

    Schuster, Peter

    2014-12-01

    A basic question in evolution is dealing with the nature of an evolutionary memory. At thermodynamic equilibrium, at stable stationary states or other stable attractors the memory on the path leading to the long-time solution is erased, at least in part. Similar arguments hold for unique optima. Optimality in biology is discussed on the basis of microbial metabolism. Biology, on the other hand, is characterized by historical contingency, which has recently become accessible to experimental test in bacterial populations evolving under controlled conditions. Computer simulations give additional insight into the nature of the evolutionary memory, which is ultimately caused by the enormous space of possibilities that is so large that it escapes all attempts of visualization. In essence, this contribution is dealing with two questions of current evolutionary theory: (i) Are organisms operating at optimal performance? and (ii) How is the evolutionary memory built up in populations?

  6. A 20-year perspective on preparation strategies and career planning of pharmacy deans.

    Science.gov (United States)

    Draugalis, JoLaine Reierson; Plaza, Cecilia M

    2010-11-10

    To provide a longitudinal description of the variety of career paths and preparation strategies of pharmacy deans. A descriptive cross-sectional study design using survey research methodology was used. Chief executive officer (CEO) deans at every full and associate member institution of the American Association of Colleges of Pharmacy (AACP) in the United States as of May 1, 2009, were potential subjects. The database housed 90.3% (N = 93) of all current (excluding interim/acting) CEO deans. Of the 4 cohorts across time (1991, 1996, 2002, and 2009 snapshots), the 2009 cohort had the highest percentage of deans following either the hierarchical or nontraditional career paths. Deans named since 2002 have spent less time collectively in the professoriate than cohorts before them. One reason for this is the increase in the number of deans that followed nontraditional career paths and who spent little or no time in the professoriate prior to their first deanship. This also could be due to the increased demand for individuals to serve as dean due to retirements and the creation of new institutions.

  7. 33 CFR 154.1030 - General response plan contents.

    Science.gov (United States)

    2010-07-01

    ... and health plan. (vi) List of acronyms and definitions. (vii) A geographic-specific appendix for each... the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (40 CFR part 300) and the Area Contingency Plan(s) (ACP) covering the area in which the facility operates. Facility owners or...

  8. Petroleum taxation under uncertainty - contingent claims

    International Nuclear Information System (INIS)

    Lund, D.

    1990-01-01

    A workable method for the analysis of incentive effects of petroleum taxes under uncertainty is presented. The main advantage of the method is that it concludes with a single number for the after-tax value of any development plan, and thus allows for a quantification of incentive effects for any given description of production possibilities. It is, however, not possible to describe tax effects under uncertainty by simple magnitudes independent of production possibilities, such as wedges in rates of return. The theoretical basis is the contingent claims analysis from finance theory, which is applicable in particular to companies that are owned by well-diversified shareholders. It is not obvious that the tax authorities of poorly diversified countries should value uncertain income streams by the same method. The Norwegian petroleum taxation is shown to have strongly distortionary effects compared to a no-tax situation or a cash flow tax. These distortions were reduced by the tax changes that followed the 1986 decreases in crude oil prices. A weakness of the model of the Norwegian system is that an exactly optimal financial policy for the company has not been found. 30 refs., 2 figs., 3 tabs

  9. Equilibria of perceptrons for simple contingency problems.

    Science.gov (United States)

    Dawson, Michael R W; Dupuis, Brian

    2012-08-01

    The contingency between cues and outcomes is fundamentally important to theories of causal reasoning and to theories of associative learning. Researchers have computed the equilibria of Rescorla-Wagner models for a variety of contingency problems, and have used these equilibria to identify situations in which the Rescorla-Wagner model is consistent, or inconsistent, with normative models of contingency. Mathematical analyses that directly compare artificial neural networks to contingency theory have not been performed, because of the assumed equivalence between the Rescorla-Wagner learning rule and the delta rule training of artificial neural networks. However, recent results indicate that this equivalence is not as straightforward as typically assumed, suggesting a strong need for mathematical accounts of how networks deal with contingency problems. One such analysis is presented here, where it is proven that the structure of the equilibrium for a simple network trained on a basic contingency problem is quite different from the structure of the equilibrium for a Rescorla-Wagner model faced with the same problem. However, these structural differences lead to functionally equivalent behavior. The implications of this result for the relationships between associative learning, contingency theory, and connectionism are discussed.

  10. ACCOUNTING FOR CONTINGENT CONSIDERATIONS IN BUSINESS COMBINATIONS

    Directory of Open Access Journals (Sweden)

    Gurgen KALASHYAN

    2017-07-01

    Full Text Available According to IFRS 3 Business Combinations contingent considerations must be included in the total consideration given for the acquired entity along with cash, other assets, ordinary or preference equity instruments, options, warrants. The contingent consideration is the determined amount which acquiring entity has to pay to acquired entity provided, that certain conditions will be fulfilled in the future. In case the provisions are not satisfied, we will get the situation when the amount of contingent consideration has been included in the total consideration given in the business combination, but in fact, the acquirer has not paid that amount. In its turn, the acquired entity will recognize the contingent consideration as a financial asset according to IFRS 9 Financial Instruments. In that case, it would be appropriately to recognize the contingent consideration as a contingent asset applying IAS 37. In the Article the author will explore the challenges of contingent consideration accounting and suggest the ways of solving the above mentioned problems.

  11. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  12. Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

    Science.gov (United States)

    Van Cise, E. A.; Kelly, B. J.; Radigan, J. P.; Cranmer, C. W.

    2016-01-01

    The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency

  13. The Corps Engineer Battalion in Contingency Operations

    National Research Council Canada - National Science Library

    Raymer, James

    2001-01-01

    .... The central research question asks: Is the proposed echelons above division engineer battalion design a better one for active and reserve component corps engineer forces to respond in a contingency...

  14. Strategy as Mutually Contingent Choice

    Directory of Open Access Journals (Sweden)

    Neil Martin

    2016-05-01

    Full Text Available Thomas Schelling’s The Strategy of Conflict carries significant behavioral implications which have been overlooked by economic readers. I argue that these implications are central to Schelling’s vision of game theory, that they fit well with recent advances in experimental psychology and behavioral economics, and provide a comprehensive framework that can inform research on strategy. In my view, Schelling develops a non-mathematical approach to strategy which anticipates on Gigerenzer and Selten’s “ecological rationality” program. This approach maps the processes involved in strategic reasoning and highlights their reliance on the particular information structure of interactive social environments. Building on this approach, I model strategy as a heuristic form of reasoning that governs the way in which individuals search for and provide cues in situations of mutually contingent choice. I conclude by examining how the reference to ecological rationality can help clarify Schelling’s contribution to game theory and outline potential avenues of research into strategic reasoning and interaction.

  15. Probabilistic real-time contingency ranking method

    International Nuclear Information System (INIS)

    Mijuskovic, N.A.; Stojnic, D.

    2000-01-01

    This paper describes a real-time contingency method based on a probabilistic index-expected energy not supplied. This way it is possible to take into account the stochastic nature of the electric power system equipment outages. This approach enables more comprehensive ranking of contingencies and it is possible to form reliability cost values that can form the basis for hourly spot price calculations. The electric power system of Serbia is used as an example for the method proposed. (author)

  16. ACCOUNTING FOR CONTINGENT CONSIDERATIONS IN BUSINESS COMBINATIONS

    OpenAIRE

    Gurgen KALASHYAN

    2017-01-01

    According to IFRS 3 Business Combinations contingent considerations must be included in the total consideration given for the acquired entity along with cash, other assets, ordinary or preference equity instruments, options, warrants. The contingent consideration is the determined amount which acquiring entity has to pay to acquired entity provided, that certain conditions will be fulfilled in the future. In case the provisions are not satisfied, we will get the situation when the amount of c...

  17. The Contingent Value of Organizational Integration

    Directory of Open Access Journals (Sweden)

    Virpi Turkulainen

    2013-08-01

    Full Text Available We elaborate the link between organizational design and effectiveness by examining organizational integration and performance in the context of modern manufacturing. Through careful contextualization and empirical analysis of 266 manufacturing organizations in three industries and nine countries, we uncover a joint effect of integration and complexity on organizational effectiveness. The results extend structural contingency theory, in particular the mechanisms that link organizational integration to organizational effectiveness. We conclude by discussing the continuing relevance of structural contingency theory.

  18. Pension regulation and the market value of pension liabilities - A contingent claims analysis using Parisian options

    NARCIS (Netherlands)

    Broeders, D.; Chen, A.

    2008-01-01

    We analyze the market-consistent valuation of pension liabilities in a contingent claim framework whereby a knock-out barrier feature is applied to capture early regulatory closure of a pension plan. We investigate two cases which we call "immediate closure procedure" and "delayed closure

  19. A Contingent Analysis of the Relationship between IS Implementation Strategies and IS Success.

    Science.gov (United States)

    Kim, Sang-Hoon; Lee, Jinjoo

    1991-01-01

    Considers approaches to dealing with user attitudes toward newly implemented information systems (IS), and suggests that behavioral management strategies relevant to IS fall into three categories: (1) empirical/rational; (2) normative/reeducative; and (3) power/coercive, based on "planned change" theories. An integrative contingent model…

  20. Explaining the discrepancy between intentions and actions: the case of hypothetical bias in contingent valuation

    Science.gov (United States)

    Icek Ajzen; Thomas C. Brown; Franklin Carvajal

    2004-01-01

    An experiment was designed to account for intention-behavior discrepancies by applying the theory of planned behavior to contingent valuation. College students (N = 160) voted in hypothetical and real payment referenda to contribute $8 to a scholarship fund. Overestimates of willingness to pay in the hypothetical referendum could not be attributed to moderately...

  1. 75 FR 54773 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Science.gov (United States)

    2010-09-09

    .... Monitoring Network and Verification of Continued Attainment 4. Contingency Plan 5. Conformity Determination... maintenance plan to EPA on June 16, 2010. B. Limited Maintenance Plan The definition, general requirements... Continued Attainment, Contingency Plan, and Conformity Determinations Under Limited Maintenance Plans. These...

  2. The state of art of contingency and emergency plans for oil spill in the Brazilian ports and terminals; O estado da arte dos planos de emergencia e contingencia para derramamento de oleo nos portos e terminais brasileiros

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Sergio R.; Wasserman, Julio C.; Lima, Gilson B.A. [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    Brazilian legislation establishes that the potentially polluting activities, as is the case of the ports and terminals, possess plans of emergency for spilling in order to prevent impacts to the physical, socio cultural and of the work environment. The Federal Law n. 9966, of April 2000, known as the 'Law of the Oil' established the basic principles, to be obeyed for the companies, for harmful or dangerous oil movement and other substances in ports, terminals, platforms and ships in waters under national jurisdiction. The Law defines that the emergency plans are a set of measures that determine the responsibilities and the actions to be unchained after an incident immediately, as well as define the human resources, material and adequate equipment to the prevention, has controlled and combat to the pollution of waters. The CONAMA n. 398, of June of 2008, create a standardization of those procedures, so that there is an integration among the several emergency plans in a certain area. This article has for objective to accomplish a diagnosis in the several institutional programs of emergency to identify the current situation in the organized and terminal ports specialized in liquid barns, evaluating, when possible, it rationality of support logistic, the organization of operational administration and integration. (author)

  3. The state of art of contingency and emergency plans for oil spill in the Brazilian ports and terminals; O estado da arte dos planos de emergencia e contingencia para derramamento de oleo nos portos e terminais brasileiros

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Sergio R; Wasserman, Julio C; Lima, Gilson B.A. [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    Brazilian legislation establishes that the potentially polluting activities, as is the case of the ports and terminals, possess plans of emergency for spilling in order to prevent impacts to the physical, socio cultural and of the work environment. The Federal Law n. 9966, of April 2000, known as the 'Law of the Oil' established the basic principles, to be obeyed for the companies, for harmful or dangerous oil movement and other substances in ports, terminals, platforms and ships in waters under national jurisdiction. The Law defines that the emergency plans are a set of measures that determine the responsibilities and the actions to be unchained after an incident immediately, as well as define the human resources, material and adequate equipment to the prevention, has controlled and combat to the pollution of waters. The CONAMA n. 398, of June of 2008, create a standardization of those procedures, so that there is an integration among the several emergency plans in a certain area. This article has for objective to accomplish a diagnosis in the several institutional programs of emergency to identify the current situation in the organized and terminal ports specialized in liquid barns, evaluating, when possible, it rationality of support logistic, the organization of operational administration and integration. (author)

  4. Domestic food practices: A study of food management behaviors and the role of food preparation planning in reducing waste.

    Science.gov (United States)

    Romani, Simona; Grappi, Silvia; Bagozzi, Richard P; Barone, Ada Maria

    2018-02-01

    Recent research has started to show the key role of daily food provision practices in affecting household food waste. Building on and extending these previous contributions, the objective of this paper is to investigate how individuals' everyday practices regarding food (e.g., shopping, cooking, eating, etc.) lead to food waste, and how policy makers and the food industry can implement effective strategies to influence such practices and ultimately help consumers reduce food waste. The research performs three Studies; a critical incident qualitative study (Study 1; N = 514) and a quantitative, survey-based study (Study 2; N = 456) to identify and examine relevant food management behaviors associated with domestic waste. Lastly, findings from a field experiment (Study 3; N = 210) suggest that a specific educational intervention, directed at increasing consumers' perceived skills related to food preparation planning behaviors, reduces domestic food waste. Implications of the research for policy makers and the food industry are discussed. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. Stimulus Evaluation, Event Preparation, and Motor Action Planning in Young Patients With Mild Spastic Cerebral Palsy : An Event-Related Brain Potential Study

    NARCIS (Netherlands)

    Hakkarainen, Elina; Pirila, Silja; Kaartinen, Jukka; van der Meere, Jaap J.

    The study investigated stimulus evaluation time, event preparation, and motor action planning of patients with mild spastic cerebral palsy and a peer control group in the age range of 9 to 18 years. To this end, participants were carrying out a stimulus recognition task. Findings indicated an

  6. Problems with Contingency Theory: Testing Assumptions Hidden within the Language of Contingency "Theory".

    Science.gov (United States)

    Schoonhoven, Clausia Bird

    1981-01-01

    Discusses problems in contingency theory, which relates organizational structure to the tasks performed and the information needed. Analysis of data from 17 hospitals suggests that traditional contingency theory underrepresents the complexity of relations among technological uncertainty, structure, and organizational effectiveness. (Author/RW)

  7. Optimal self-esteem is contingent: Intrinsic versus extrinsic and upward versus downward contingencies

    NARCIS (Netherlands)

    Vonk, R.; Smit, H.M.M.

    2012-01-01

    We argue that noncontingent, unconditional self-esteem is not optimal but defensive. We introduce the concept of intrinsic contingency, where self-esteem is affected by whether one's actions are self-congruent and conducive to personal growth. Whereas external contingencies, especially social and

  8. Going for gold: blood planning for the London 2012 Olympic Games.

    Science.gov (United States)

    Glasgow, S M; Allard, S; Rackham, R; Doughty, H

    2014-06-01

    The Olympics is one of the largest sporting events in the world. Major events may be complicated by disruption of normal activity and major incidents. Health care and transfusion planners should be prepared for both. Previously, transfusion contingency planning has focused on seasonal blood shortages and pandemic influenzas. This article is the first published account of transfusion contingency planning for a major event. We describe the issues encountered and the lessons identified during transfusion planning for the London 2012 Olympics. Planning was started 18 months in advance and was led by a project team reporting to the Executive. Planning was based on three periods of Gamestime. The requirements were planned with key stakeholders using normal processes enhanced by service developments. Demand planning was based on literature review together with computer modelling. The aim was blood-stock sufficiency complimented by a high readiness donor panel to minimise waste. Plans were widely communicated and table-top exercised. Full transfusion services were maintained during both Games with all demands met. The new service improvements and high readiness donors worked well. Emergency command and control have been upgraded. Red cell concentrate (RCC) stock aged but wastage was not significantly increased. The key to success was: early planning, stakeholder engagement, service developments, integration of transfusion service planning within the wider health care community and conduct within an assurance framework. © 2014 The Authors. Transfusion Medicine © 2014 British Blood Transfusion Society.

  9. Searching for Plausible N-k Contingencies Endangering Voltage Stability

    DEFF Research Database (Denmark)

    Weckesser, Johannes Tilman Gabriel; Van Cutsem, Thierry

    2017-01-01

    This paper presents a novel search algorithm using time-domain simulations to identify plausible N − k contingencies endangering voltage stability. Starting from an initial list of disturbances, progressively more severe contingencies are investigated. After simulation of a N − k contingency......, the simulation results are assessed. If the system response is unstable, a plausible harmful contingency sequence has been found. Otherwise, components affected by the contingencies are considered as candidate next event leading to N − (k + 1) contingencies. This implicitly takes into account hidden failures...

  10. Opinions of forest administration chief officers in Artvin Regional Directorate of Forestry about preparation and application phases of forest management plans

    Directory of Open Access Journals (Sweden)

    Rahmi Yılma

    2016-10-01

    Full Text Available In this study, based on the example of Artvin Regional Directorate of Forestry, it is aimed to display the viewpoints of forest administration chief officers as regards planning who are the basic elements of interest groups and who implement plans, determine their opinions about the problems they encounter during preparation and application phases of plans, and develop solution proposals. Within this study a survey was performed with 31 forest administration chief officers in Artvin Regional Directorate of Forestry. According to the survey results, at planning phase it has been seen that participatory processes are put into force, certain criteria and indicators are adopted in differentiating between forest functions at inventory stage, which were also taken into consideration during planning, and in particularly stand parameters were determined accurately. Also during planning phase, it is believed that, endemic, rare and endangered targeted plant and wild animal species are evaluated, whereas non-wood forest types suffer from a lack of evaluation. In addition, it was concluded that lack or insufficiency of silviculture plans, the size of forest administration chiefdom and relations problems between forest administration and local people were being experienced. By integrating other interest groups to planning process, widening the scope of the sudty and realizing similar studies in different regional directorates of forestry, we can determine common points and differences and by this way new strategies can be developed.

  11. Color and Contingency in Robert Boyle's Works.

    Science.gov (United States)

    Baker, Tawrin

    2015-01-01

    This essay investigates the relationship between color and contingency in Robert Boyle's Experiments and Considerations Touching Colours (1664) and his essays on the unsuccessfulness of experiments in Certain Physiological Essays (1661). In these two works Boyle wrestles with a difficult practical and philosophical problem with experiments, which he calls the problem of contingency. In Touching Colours, the problem of contingency is magnified by the much-debated issue of whether color had any deep epistemic importance. His limited theoretical principle guiding him in Touching Colours, that color is but modified light, further exacerbated the problem. Rather than theory, Boyle often relied on craftsmen, whose mastery of color phenomena was, Boyle mentions, brought about by economic forces, to determine when colors were indicators of important 'inward' properties of substances, and thus to secure a solid foundation for his experimental history of color.

  12. Equivalence relations and the reinforcement contingency.

    Science.gov (United States)

    Sidman, M

    2000-07-01

    Where do equivalence relations come from? One possible answer is that they arise directly from the reinforcement contingency. That is to say, a reinforcement contingency produces two types of outcome: (a) 2-, 3-, 4-, 5-, or n-term units of analysis that are known, respectively, as operant reinforcement, simple discrimination, conditional discrimination, second-order conditional discrimination, and so on; and (b) equivalence relations that consist of ordered pairs of all positive elements that participate in the contingency. This conception of the origin of equivalence relations leads to a number of new and verifiable ways of conceptualizing equivalence relations and, more generally, the stimulus control of operant behavior. The theory is also capable of experimental disproof.

  13. Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Adair, Kristin Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Turgeon, Jennifer [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). High Confidence System Environments

    2016-04-01

    The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

  14. Contingency learning in human fear conditioning involves the ventral striatum.

    Science.gov (United States)

    Klucken, Tim; Tabbert, Katharina; Schweckendiek, Jan; Merz, Christian Josef; Kagerer, Sabine; Vaitl, Dieter; Stark, Rudolf

    2009-11-01

    The ability to detect and learn contingencies between fearful stimuli and their predictive cues is an important capacity to cope with the environment. Contingency awareness refers to the ability to verbalize the relationships between conditioned and unconditioned stimuli. Although there is a heated debate about the influence of contingency awareness on conditioned fear responses, neural correlates behind the formation process of contingency awareness have gained only little attention in human fear conditioning. Recent animal studies indicate that the ventral striatum (VS) could be involved in this process, but in human studies the VS is mostly associated with positive emotions. To examine this question, we reanalyzed four recently published classical fear conditioning studies (n = 117) with respect to the VS at three distinct levels of contingency awareness: subjects, who did not learn the contingencies (unaware), subjects, who learned the contingencies during the experiment (learned aware) and subjects, who were informed about the contingencies in advance (instructed aware). The results showed significantly increased activations in the left and right VS in learned aware compared to unaware subjects. Interestingly, this activation pattern was only found in learned but not in instructed aware subjects. We assume that the VS is not involved when contingency awareness does not develop during conditioning or when contingency awareness is unambiguously induced already prior to conditioning. VS involvement seems to be important for the transition from a contingency unaware to a contingency aware state. Implications for fear conditioning models as well as for the contingency awareness debate are discussed.

  15. A contingency table approach to nonparametric testing

    CERN Document Server

    Rayner, JCW

    2000-01-01

    Most texts on nonparametric techniques concentrate on location and linear-linear (correlation) tests, with less emphasis on dispersion effects and linear-quadratic tests. Tests for higher moment effects are virtually ignored. Using a fresh approach, A Contingency Table Approach to Nonparametric Testing unifies and extends the popular, standard tests by linking them to tests based on models for data that can be presented in contingency tables.This approach unifies popular nonparametric statistical inference and makes the traditional, most commonly performed nonparametric analyses much more comp

  16. Estimating state-contingent production functions

    DEFF Research Database (Denmark)

    Rasmussen, Svend; Karantininis, Kostas

    The paper reviews the empirical problem of estimating state-contingent production functions. The major problem is that states of nature may not be registered and/or that the number of observation per state is low. Monte Carlo simulation is used to generate an artificial, uncertain production...... environment based on Cobb Douglas production functions with state-contingent parameters. The pa-rameters are subsequently estimated based on different sizes of samples using Generalized Least Squares and Generalized Maximum Entropy and the results are compared. It is concluded that Maximum Entropy may...

  17. The contingent valuation method: a review

    International Nuclear Information System (INIS)

    Venkatachalam, L.

    2004-01-01

    The contingent valuation method (CVM) is a simple, flexible nonmarket valuation method that is widely used in cost-benefit analysis and environmental impact assessment. However, this method is subject to severe criticism. The criticism revolves mainly around two aspects, namely, the validity and the reliability of the results, and the effects of various biases and errors. The major objective of this paper is to review the recent developments on measures to address the validity and reliability issues arising out of different kinds of biases/errors and other related empirical and methodological issues concerning contingent valuation method

  18. 76 FR 56790 - Notice of Intent To Prepare an Amendment to the Caliente Resource Management Plan and Associated...

    Science.gov (United States)

    2011-09-14

    ... the EA will consider both a plan amendment and the subsequent sale of the land and has identified the... Plan and Associated Environmental Assessment AGENCY: Bureau of Land Management, Interior. ACTION... amendment to the 1997 Caliente Resource Management Plan (RMP) and an Environmental Assessment (EA) to...

  19. 78 FR 56730 - Notice of Intent To Amend the Resource Management Plan for the Gunnison Field Office and Prepare...

    Science.gov (United States)

    2013-09-13

    ... submit comments on issues and planning criteria related to Hartman Rocks Special Recreation Area... the scoping process; and seeks public input on issues and preliminary planning criteria. The planning... manner that maintains or improves the condition and health of the unique landscape and natural resources...

  20. 75 FR 7517 - Notice of Intent To Prepare an Amendment to the Ring of Fire Resource Management Plan for the...

    Science.gov (United States)

    2010-02-19

    ... Municipality of Anchorage. This planning activity encompasses approximately 730 acres of public land in the Ring of Fire planning area. The BLM released the Ring of Fire RMP Record of Decision (ROD) in March... be addressed by this planning effort are increased annual visitation, commercial use, on- going trail...

  1. Effectiveness evaluation of contingency sum as a risk management ...

    African Journals Online (AJOL)

    Ethiopian Journal of Environmental Studies and Management ... manage risks prone projects have adopted several methods, one of which is contingency sum. ... initial project cost, cost overrun and percentage allowed for contingency.

  2. 48 CFR 1632.770 - Contingency reserve payments.

    Science.gov (United States)

    2010-10-01

    ... FINANCING Contract Funding 1632.770 Contingency reserve payments. (a) Payments from the contingency reserve... advise the carrier of its decision. However, OPM shall not unreasonably withhold approval for amounts...

  3. The Royal Naval Medical Services: delivering medical operational capability. the 'black art' of Medical Operational Planning.

    Science.gov (United States)

    Faye, M

    2013-01-01

    This article looks to dispel the mysteries of the 'black art' of Medical Operational Planning whilst giving an overview of activity within the Medical Operational Capability area of Medical Division (Med Div) within Navy Command Headquarters (NCHQ) during a period when the Royal Naval Medical Services (RNMS) have been preparing and reconfiguring medical capability for the future contingent battle spaces. The rolling exercise program has been used to illustrate the ongoing preparations taken by the Medical Operational Capability (Med Op Cap) and the Medical Force Elements to deliver medical capability in the littoral and maritime environments.

  4. Contingency Management with Human Autonomy Teaming

    Science.gov (United States)

    Shively, Robert J.; Lachter, Joel B.

    2018-01-01

    Automation is playing an increasingly important role in many operations. It is often cheaper faster and more precise than human operators. However, automation is not perfect. There are many situations in which a human operator must step in. We refer to these instances as contingencies and the act of stepping in contingency management. Here we propose coupling Human Autonomy Teaming (HAT) with contingency management. We describe two aspects to HAT, bi-directional communication, and working agreements (or plays). Bi-directional communication like Crew Resource Management in traditional aviation, allows all parties to contribute to a decision. Working agreements specify roles and responsibilities. Importantly working agreements allow for the possibility of roles and responsibilities changing depending on environmental factors (e.g., situations the automation was not designed for, workload, risk, or trust). This allows for the automation to "automatically" become more autonomous as it becomes more trusted and/or it is updated to deal with a more complete set of possible situations. We present a concrete example using a prototype contingency management station one might find in a future airline operations center. Automation proposes reroutes for aircraft that encounter bad weather or are forced to divert for environmental or systems reasons. If specific conditions are met, these recommendations may be autonomously datalinked to the affected aircraft.

  5. Two psychologies: Cognitive versus contingency-oriented

    NARCIS (Netherlands)

    Mey, H.R.A. De

    2003-01-01

    Cognitive psychology and contingency-based behavior analysis are contrasted to each other with respect to their philosophical and theoretical underpinnings as well as to theirpractical goals. Whereas the former focuses on intra-organismic structure and function in explaining minds, the latter

  6. The dependency and contingency of politics

    DEFF Research Database (Denmark)

    Triantafillou, Peter

    2016-01-01

    differences which make any analytical synthesis both a difficult and a questionable endeavour. In particular, whereas historical institutionalism seeks to explain the present in terms of its dependence on past events, genealogy seeks to provoke the present by demonstrating its historical contingency. In spite...

  7. Management issues regarding the contingent workforce

    Energy Technology Data Exchange (ETDEWEB)

    Bowen-Smed, S. [Bowen Workforce Solutions, Calgary, AB (Canada)

    2004-07-01

    Fifty per cent of corporate leaders in Calgary today will be eligible for retirement over the next 5 years. In addition, 53 per cent of the entire Calgary workforce is 45 years or older. This paper suggests that only companies that seek aggressive programs to engage immigrants and contractors will weather the skills shortages anticipated in the future. It was noted that contractors care about aligning values to organizations, regardless of the project length, and that professional development is a key consideration when it comes to selecting their next project. Contingent workforce issues include: effectiveness; classification; risk; and cost. It was stated that effectiveness of the contingent workforce is an employer's responsibility. Factors that would strengthen the relationship between corporations and contractors include: proper orientation to manage expectations; training to improve productivity; tracking to enhance the quality of the workforce; and a management process to ensure adherence to protocol. It was concluded that the contingent workforce is an essential component to human capital management strategy, but that key issues must be managed to avoid unnecessary costs. In addition, effectiveness improves when processes are implemented. It was also suggested that technology is an essential component of the solution. Outsourcing is an effective approach to managing the contingent workforce. tabs., figs.

  8. Responsibility modelling for civil emergency planning

    OpenAIRE

    Sommerville, Ian; Storer, Timothy; Lock, Russell

    2009-01-01

    This paper presents a new approach to analysing and understanding civil emergency planning based on the notion of responsibility modelling combined with HAZOPS-style analysis of information requirements. Our goal is to represent complex contingency plans so that they can be more readily understood, so that inconsistencies can be highlighted and vulnerabilities discovered. In this paper, we outline the framework for contingency planning in the United Kingdom and introduce the notion of respons...

  9. Contingency learning in alcohol dependence and pathological gambling: learning and unlearning reward contingencies

    NARCIS (Netherlands)

    Vanes, Lucy D.; van Holst, Ruth J.; Jansen, Jochem M.; van den Brink, Wim; Oosterlaan, Jaap; Goudriaan, Anna E.

    2014-01-01

    Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex mix of

  10. Contingency learning in alcohol dependence and pathological gambling: learning and unlearning reward contingencies

    NARCIS (Netherlands)

    Vanes, L.D.; Holst, R.J. van; Jansen, J.M.; Brink, W. van den; Oosterlaan, J.; Goudriaan, A.E.

    2014-01-01

    BACKGROUND: Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex

  11. Contingency Learning in Alcohol Dependence and Pathological Gambling: Learning and Unlearning Reward Contingencies

    NARCIS (Netherlands)

    Vanes, L.D.; Holst, R.; Jansen, J.D.; van den Brink, W.A.; Oosterlaan, J.; Goudriaan, A.E.

    2014-01-01

    Background: Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex

  12. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  13. Effect of the PREPARE Website vs an Easy-to-Read Advance Directive on Advance Care Planning Documentation and Engagement Among Veterans: A Randomized Clinical Trial.

    Science.gov (United States)

    Sudore, Rebecca L; Boscardin, John; Feuz, Mariko A; McMahan, Ryan D; Katen, Mary T; Barnes, Deborah E

    2017-08-01

    Documentation rates of patients' medical wishes are often low. It is unknown whether easy-to-use, patient-facing advance care planning (ACP) interventions can overcome barriers to planning in busy primary care settings. To compare the efficacy of an interactive, patient-centered ACP website (PREPARE) with an easy-to-read advance directive (AD) to increase planning documentation. This was a comparative effectiveness randomized clinical trial from April 2013 to July 2016 conducted at multiple primary care clinics at the San Francisco VA Medical Center. Inclusion criteria were age of a least 60 years; at least 2 chronic and/or serious conditions; and 2 or more primary care visits; and 2 or more additional clinic, hospital, or emergency room visits in the last year. Participants were randomized to review PREPARE plus an easy-to-read AD or the AD alone. There were no clinician and/or system-level interventions or education. Research staff were blinded for all follow-up measurements. The primary outcome was new ACP documentation (ie, legal forms and/or discussions) at 9 months. Secondary outcomes included patient-reported ACP engagement at 1 week, 3 months, and 6 months using validated surveys of behavior change process measures (ie, 5-point knowledge, self-efficacy, readiness scales) and action measures (eg, surrogate designation, using a 0-25 scale). We used intention-to-treat, mixed-effects logistic and linear regression, controlling for time, health literacy, race/ethnicity, baseline ACP, and clustering by physician. The mean (SD) age of 414 participants was 71 (8) years, 38 (9%) were women, 83 (20%) had limited literacy, and 179 (43%) were nonwhite. No participant characteristic differed significantly among study arms at baseline. Retention at 6 months was 90%. Advance care planning documentation 6 months after enrollment was higher in the PREPARE arm vs the AD-alone arm (adjusted 35% vs 25%; odds ratio, 1.61 [95% CI, 1.03-2.51]; P = .04). PREPARE also resulted

  14. 40 CFR 51.1012 - Requirement for contingency measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Requirement for contingency measures... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1012 Requirement for contingency measures... contingency measures to be undertaken if the area fails to make reasonable further progress, or fails to...

  15. 78 FR 46781 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-08-01

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... the Federal Acquisition Regulation (FAR) to revise the definition of ``contingency operation'' to... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  16. 30 CFR 218.152 - Fishermen's Contingency Fund.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Fishermen's Contingency Fund. 218.152 Section 218.152 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR MINERALS REVENUE..., Offshore § 218.152 Fishermen's Contingency Fund. Upon the establishment of the Fishermen's Contingency Fund...

  17. 78 FR 13765 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-02-28

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... Regulation (FAR) to revise the definition of ``contingency operation'' to address the statutory change to the... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  18. 50 CFR 296.3 - Fishermen's contingency fund.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Fishermen's contingency fund. 296.3... ADMINISTRATION, DEPARTMENT OF COMMERCE CONTINENTAL SHELF FISHERMEN'S CONTINGENCY FUND § 296.3 Fishermen's contingency fund. (a) General. There is established in the Treasury of the United States the Fishermen's...

  19. Psychophysics of associative learning: Quantitative properties of subjective contingency.

    Science.gov (United States)

    Maia, Susana; Lefèvre, Françoise; Jozefowiez, Jérémie

    2018-01-01

    Allan and collaborators (Allan, Hannah, Crump, & Siegel, 2008; Allan, Siegel, & Tangen, 2005; Siegel, Allan, Hannah, & Crump, 2009) recently proposed to apply signal detection theory to the analysis of contingency judgment tasks. When exposed to a flow of stimuli, participants are asked to judge whether there is a contingent relation between a cue and an outcome, that is, whether the subjective cue-outcome contingency exceeds a decision threshold. In this context, we tested the following hypotheses regarding the relation between objective and subjective cue-outcome contingency: (a) The underlying distributions of subjective cue-outcome contingency are Gaussian; (b) The mean distribution of subjective contingency is a linear function of objective cue-outcome contingency; and (c) The variance in the distribution of subjective contingency is constant. The hypotheses were tested by combining a streamed-trial contingency assessment task with a confidence rating procedure. Participants were exposed to rapid flows of stimuli at the end of which they had to judge whether an outcome was more (Experiment 1) or less (Experiment 2) likely to appear following a cue and how sure they were of their judgment. We found that although Hypothesis A seems reasonable, Hypotheses B and C were not. Regarding Hypothesis B, participants were more sensitive to positive than to negative contingencies. Regarding Hypothesis C, the perceived cue-outcome contingency became more variable when the contingency became more positive or negative, but only to a slight extent. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  20. 48 CFR 225.7303-4 - Contingent fees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contingent fees. 225.7303....7303-4 Contingent fees. (a) Except as provided in paragraph (b) of this subsection, contingent fees are generally allowable under DoD contracts, provided— (1) The fees are paid to a bona fide employee or a bona...

  1. Sartre's Contingency of Being and Asouzu's Principle of Causality ...

    African Journals Online (AJOL)

    The position of this work is that all contingent beings have a causal agent. This position is taken as a result of trying to delve into the issue of contingency and causality of being which has been discussed by many philosophers of diverse epochs of philosophy. This work tries to participate in the debate of whether contingent ...

  2. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D ampersand D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities

  3. 42 CFR 137.360 - Does the Secretary approve project planning and design documents prepared by the Self-Governance...

    Science.gov (United States)

    2010-10-01

    ... design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and... documents prepared by the Self-Governance Tribe? The Secretary shall have at least one opportunity to...

  4. 78 FR 25134 - Termination of the Preparation of an Air Tour Management Plan and Environmental Assessment for...

    Science.gov (United States)

    2013-04-29

    ... Forest National Park in Arizona. The FAA and NPS have stopped work on preparation of the ATMP and EA... Lusk, Program Manager, AWP-1SP, Federal Aviation Administration, Western-Pacific Region, P.O. Box 92007... developed. The FAA and NPS began preparing an EA to comply with the National Environmental Policy Act (Pub...

  5. Contingent capture effects in temporal order judgments.

    Science.gov (United States)

    Born, Sabine; Kerzel, Dirk; Pratt, Jay

    2015-08-01

    The contingent attentional capture hypothesis proposes that visual stimuli that do not possess characteristics relevant for the current task will not capture attention, irrespective of their bottom-up saliency. Typically, contingent capture is tested in a spatial cuing paradigm, comparing manual reaction times (RTs) across different conditions. However, attention may act through several mechanisms and RTs may not be ideal to disentangle those different components. In 3 experiments, we examined whether color singleton cues provoke cuing effects in temporal order judgments (TOJs) and whether they would be contingent on attentional control sets. Experiment 1 showed that color singleton cues indeed produce cuing effects in TOJs, even in a cluttered and dynamic target display containing multiple heterogeneous distractors. In Experiment 2, consistent with contingent capture, we observed reliable cuing effects only when the singleton cue matched participants' current attentional control set. Experiment 3 suggests that a sensory interaction account of the differences found in Experiment 2 is unlikely. Our results help to discern the attentional components that may play a role in contingent capture. Further, we discuss a number of other effects (e.g., reversed cuing effects) that are found in RTs, but so far have not been reported in TOJs. Those differences suggest that RTs are influenced by a multitude of mechanisms; however, not all of these mechanisms may affect TOJs. We conclude by highlighting how the study of attentional capture in TOJs provides valuable insights for the attention literature, but also for studies concerned with the perceived timing between stimuli. (c) 2015 APA, all rights reserved).

  6. 78 FR 66064 - Notice of Intent To Prepare a Livestock Grazing Monument Management Plan Amendment and Associated...

    Science.gov (United States)

    2013-11-04

    ...-level decisions associated with livestock grazing, thereby amending the GSENM Management Plan. DATES..., archaeology, paleontology, wildlife and fisheries, hydrology, soils, sociology and economics, and public...

  7. 75 FR 41881 - Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-07-19

    ... lakeshore; and improved water quality. DATES: Any comments on the scope of issues to be addressed in the EIS... Restoration and Management Plan/Environmental Impact Statement (EIS) for Indiana Dunes National Lakeshore... impact statement (EIS) for a Shoreline Restoration and Management Plan (SRMP) for Indiana Dunes National...

  8. 76 FR 34249 - Notice of Intent To Prepare a Resource Management Plan Amendment/Environmental Assessment for the...

    Science.gov (United States)

    2011-06-13

    ... modification. The associated management objectives dictate the level of protection, which range from... and realty, hydrology, soils, sociology, economics, and wilderness. At present, the BLM has identified... land use planning level, the process will follow the BLM's policies in the Land Use Planning Handbook...

  9. 76 FR 31359 - Notice of Intent To Prepare an Environmental Impact Statement on a General Management Plan...

    Science.gov (United States)

    2011-05-31

    ... management activities, visitor activities, and developments that would be appropriate in the park in the future. In addition, the plan will generally address visitor-use related issues and provide management... Environmental Impact Statement on a General Management Plan Amendment/Wilderness Study for Lake Clark National...

  10. Criteria for preparation and evaluation of radiological emergency response plans and preparedness in support of nuclear power plants: Criteria for utility offsite planning and preparedness: Final report

    International Nuclear Information System (INIS)

    Podolak, E.M. Jr.; Sanders, M.E.; Wingert, V.L.; Donovan, R.W.

    1988-09-01

    The Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) have added a supplement to NUREG-0654/FEMA-REP-1, Rev. 1 that provides guidance for the development, review, and evaluation of utility offsite radiological emergency response planning and preparedness for those situations in which state and/or local governments decline to participate in emergency planning. While this guidance primarily applies to plants that do not have full-power operating licenses, it does have relevance to operating nuclear power plants

  11. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  12. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  13. Financial Preparation for Retirement in Brazil: a Cross-Cultural Test of the Interdisciplinary Financial Planning Model.

    Science.gov (United States)

    França, Lucia H F; Hershey, Douglas A

    2018-03-01

    In this investigation, we attempt to replicate the Interdisciplinary Financial Planning Model advanced by Hershey et al. (International Journal of Aging and Human Development, 70, 1-38, 2010) using a sample of Brazilian adults. This model, which was originally tested on individuals from The Netherlands and the United States, posits that psychological, social, and economic forces are key determinants of retirement planning practices and perceptions of saving adequacy. Taken together, fifteen hypotheses were subject to evaluation. Participants were 167 Brazilian working adults, 21-69 years of age, who were married or cohabitating at the time of testing. A path analysis model showed substantial support for the theoretical framework, with all variables found to contribute directly or indirectly to the prediction of financial planning and saving adequacy. Furthermore, two new paths were found to emerge in the Brazilian model that were not observed in the original investigation. This cross-national replication of the Interdisciplinary Financial Planning Model extends research on the topic to a developing country in which relatively few empirical studies of retirement planning have been carried out. Other analyses in the article focus on direct comparisons between the Brazilian model and the models developed based on American and Dutch respondents, with an eye toward better understanding how cultural forces shape the retirement planning process. The discussion focuses on how models of financial planning, such as the Hershey et al. (2010) model, can inform the development of savings-oriented education and intervention programs.

  14. Early Phase Contingency Trajectory Design for the Failure of the First Lunar Orbit Insertion Maneuver: Direct Recovery Options

    Science.gov (United States)

    Song, Young-Joo; Bae, Jonghee; Kim, Young-Rok; Kim, Bang-Yeop

    2017-12-01

    To ensure the successful launch of the Korea pathfinder lunar orbiter (KPLO) mission, the Korea Aerospace Research Institute (KARI) is now performing extensive trajectory design and analysis studies. From the trajectory design perspective, it is crucial to prepare contingency trajectory options for the failure of the first lunar brake or the failure of the first lunar orbit insertion (LOI) maneuver. As part of the early phase trajectory design and analysis activities, the required time of flight (TOF) and associated delta-V magnitudes for each recovery maneuver (RM) to recover the KPLO mission trajectory are analyzed. There are two typical trajectory recovery options, direct recovery and low energy recovery. The current work is focused on the direct recovery option. Results indicate that a quicker execution of the first RM after the failure of the first LOI plays a significant role in saving the magnitudes of the RMs. Under the conditions of the extremely tight delta-V budget that is currently allocated for the KPLO mission, it is found that the recovery of the KPLO without altering the originally planned mission orbit (a 100 km circular orbit) cannot be achieved via direct recovery options. However, feasible recovery options are suggested within the boundaries of the currently planned delta-V budget. By changing the shape and orientation of the recovered final mission orbit, it is expected that the KPLO mission may partially pursue its scientific mission after successful recovery, though it will be limited.

  15. 75 FR 77652 - Notice of Intent to Prepare a Resource Management Plan for the Battle Mountain District and...

    Science.gov (United States)

    2010-12-13

    ... agencies where appropriate. (7) The planning process will use and observe principles of multiple use and..., sociology and economics, and Geographic Information Systems. Authority: 40 CFR 1501.7, 43 CFR 1610.2. Ron...

  16. Steps in preparing and biodiversity section of climate change action plan. Development and evolution of forestry and biodiversity mitigation measures

    International Nuclear Information System (INIS)

    DiNicola, A.

    1997-01-01

    Methodic for drawing up of national action plans on prevention of unfavorable consequences of climate change in forestry is described. Approaches to development and measures evolution in these fields on greenhouse effect reduce are considered. (author)

  17. 78 FR 25299 - Notice of Intent To Prepare a Resource Management Plan for the San Pedro Riparian National...

    Science.gov (United States)

    2013-04-30

    ... level. The process will follow the BLM's policies in Appendix C of the Land Use Planning Handbook, H..., sociology, and economics. Authority: 40 CFR 1501.7, 43 CFR 1610.2 Raymond Suazo, State Director. [FR Doc...

  18. 76 FR 17801 - Approval and Promulgation of Implementation Plans; New York Reasonable Further Progress Plans...

    Science.gov (United States)

    2011-03-31

    ..., Contingency Measures and Motor Vehicle Emissions Budgets AGENCY: Environmental Protection Agency (EPA). ACTION... plan, and the contingency measures as they relate to the New York portion of the New York- Northern New... individual listed in the FOR FURTHER INFORMATION CONTACT section to view the hard copy of the docket. You may...

  19. Criteria for preparation and evaluation of radiological emergency response plans and preparedness in support of nuclear power plants. Interim report

    International Nuclear Information System (INIS)

    1980-01-01

    The purpose of this document is to provide a common reference and interim guidance source for: state and local governments and nuclear facility operators in the development of radiological emergency response plans and preparedness in support of nuclear power plants; and Nuclear Regulatory Commission (NRC), Federal Emergency Management Agency (FEMA) and other Federal agency personnel engaged in the review of state, local government, and licensee plans and preparedness

  20. [Contingency management in opioid substitution treatment].

    Science.gov (United States)

    Specka, M; Böning, A; Scherbaum, N

    2011-07-01

    The majority of opiate-dependent patients in substitution treatment show additional substance-related disorders. Concomitant use of heroin, alcohol, benzodiazepines or cocaine compromises treatment success. Concomitant drug use may be treated by using contingency management (CM) which is based on learning theory. In CM, abstinence from drugs, as verified by drug screenings, is reinforced directly and contingently. Reinforcers used in CM studies with substituted patients were, amongst others, vouchers and take-home privileges. Studies in the USA show a medium average effect of CM on drug consumption rates and abstinence. The effects decrease markedly after the end of the intervention. We discuss whether CM is applicable within the German substitution treatment system and how it can be combined with other interventions such as selective detoxification treatments or cognitive-behavioural programmes. © Georg Thieme Verlag KG Stuttgart · New York.

  1. Contingency and similarity in response selection.

    Science.gov (United States)

    Prinz, Wolfgang

    2018-05-09

    This paper explores issues of task representation in choice reaction time tasks. How is it possible, and what does it take, to represent such a task in a way that enables a performer to do the task in line with the prescriptions entailed in the instructions? First, a framework for task representation is outlined which combines the implementation of task sets and their use for performance with different kinds of representational operations (pertaining to feature compounds for event codes and code assemblies for task sets, respectively). Then, in a second step, the framework is itself embedded in the bigger picture of the classical debate on the roles of contingency and similarity for the formation of associations. The final conclusion is that both principles are needed and that the operation of similarity at the level of task sets requires and presupposes the operation of contingency at the level of event codes. Copyright © 2018 The Author. Published by Elsevier Inc. All rights reserved.

  2. Pasca Gempa Kerinci Tahun 1995 dan Rencana Kontigensi (Contingency Planning)

    OpenAIRE

    Naryanto, Heru Sri; Santoso, Eko Widi

    1997-01-01

    Gempa Kerinci tahun 1995 menimbulkan banyak korban baik jiwa maupun harta. Gempa ini juga telah melumpuhkan gerak nadi perekonomian di Kabupaten Dati Il Kerinci. Pembangunan kembali (recovery) telah dilakukan bersama-sama balk oleh pemerintah daerah, pemerintah pusat dari semua instansi terkait maupun swadaya masyarakat setempat. Berdasarkan asumsi bahwa daerah yang pernah terjadi gempa, dimungkinkan terjadi lagi gempa ditempat tersebut. Sehingga Pasca Gempa Kerinci tahun 1995 perlu ditindakl...

  3. 40 CFR 265.52 - Content of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... hazardous waste constituents to air, soil, or surface water at the facility. (b) If the owner or operator... alarm systems (internal and external), and decontamination equipment), where this equipment is required...

  4. 78 FR 64879 - Liquidity and Contingency Funding Plans

    Science.gov (United States)

    2013-10-30

    ... FICUs to have multiple sources of liquidity. Twenty-five commenters objected to the CLF's structure... sources, of funding, such as a corporate credit union or correspondent bank. C. How does the final rule... sources. However, while government sponsored, FHLBs are not federal facilities and are not obligated to...

  5. Contingency plans for chromium utilization. Publication NMAB-335

    International Nuclear Information System (INIS)

    1978-01-01

    The United States depends entirely on foreign sources for the critical material, chromium, making it very vulnerable to supply disruptions. This vulnerability results because chromium is essential for the fabrication of corrosion-resisting steels and high-temperature, oxidation-resisting alloys in applications that are vital to the nation's technological well-being; because no substitutes are known for these materials in those applications; and because the known, substantial deposits of chromite ore are only in a few geographical locations that could become inaccessible to the United States as a result of political actions. The effectiveness of programs such as stockpiling, conservation, and research and development for substitutes to reduce the impact of disruption of imports of chromite and ferrochromium are discussed. Alternatives for decreasing chromium consumption also are identified for chromium-containing materials in the areas of design, processing, and substitution

  6. Food Marketing Technology and Contingency Market Valuation

    OpenAIRE

    Garth J. Holloway; Anthony C. Zwart

    1993-01-01

    Marketing activities are introduced into a rational expectations model of the food marketing system. The model is used to evaluate effects of alternative marketing technologies on the distribution of the benefits of contingency markets in agriculture. Benefits depend on two parameters: the cost share of farm inputs and the elasticity of substitution between farm and nonfarm inputs in food marketing. Over a broad spectrum of technologies, consumers are likely to be the net beneficiaries and fa...

  7. Capacity Adjustment through Contingent Staffing Outsourcing

    OpenAIRE

    Neubert , Gilles; Adjadj , Philippe

    2009-01-01

    International audience; For a long time, contingent staffing was considered as the responsability of the Human Resource department. The high needs of workforce flexibility combined with disseminated agencies have led some companies to a great number of labor suppliers. This situation has produced important cost variation, poor quality of service, and important risk due to the mistunderstanding by local managers of legal considerations. To face this situation, companies have started to move fr...

  8. Contingency Cost estimation for Research reactor Decommissioning

    International Nuclear Information System (INIS)

    Jin, Hyung Gon; Hong, Yun Jeong

    2016-01-01

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors

  9. Contingency Cost estimation for Research reactor Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Hong, Yun Jeong [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors.

  10. Sound-contingent visual motion aftereffect

    Directory of Open Access Journals (Sweden)

    Kobayashi Maori

    2011-05-01

    Full Text Available Abstract Background After a prolonged exposure to a paired presentation of different types of signals (e.g., color and motion, one of the signals (color becomes a driver for the other signal (motion. This phenomenon, which is known as contingent motion aftereffect, indicates that the brain can establish new neural representations even in the adult's brain. However, contingent motion aftereffect has been reported only in visual or auditory domain. Here, we demonstrate that a visual motion aftereffect can be contingent on a specific sound. Results Dynamic random dots moving in an alternating right or left direction were presented to the participants. Each direction of motion was accompanied by an auditory tone of a unique and specific frequency. After a 3-minutes exposure, the tones began to exert marked influence on the visual motion perception, and the percentage of dots required to trigger motion perception systematically changed depending on the tones. Furthermore, this effect lasted for at least 2 days. Conclusions These results indicate that a new neural representation can be rapidly established between auditory and visual modalities.

  11. Contingency Valuation of Croatian Arboretum Opeka

    Directory of Open Access Journals (Sweden)

    Stjepan Posavec

    2012-12-01

    Full Text Available Background and Purpose: Social aspects of forestry have always been an important factor of forest usage and management, and therefore have significant influence on its sustainability. Non-wood forest functions such as recreation, tourism, aesthetic and educational factors influence development of rural areas. Contingent valuation method has rarely been used for evaluation of protected forest areas. The aim of the article is to estimate the amount of money visitors are willing to pay for nature’s resources preservation in the arboretum Opeka in the North-West Croatia. Material and Methods: Opeka Arboretum is situated in the Vinica municipality in northern Croatia. Located in a large park surrounding a manor, Opeka arboretum, with its 65 hectares is the largest of the three arboretums existing in Croatia today. The arboretum was founded in 1860 by the Count Marko Bombelles. Contingent valuation is a survey-based economic technique for the non-market valuation of resources, such as environmental preservation or the impact of contamination. It is also the approach that can generally be used to include what is usually referred to as the passive use component of the economic value of environmental goods. Results and Conclusion: Willingness to pay for visitor’s use of the arboretum has been investigated using the survey and contingency valuation method on a sample of 53 respondents. Research results present high preference for arboretum benefits such as beauty of landscape, cultural and historical significance, recreation and health but low willingness to pay.

  12. Decision support tools for urban contingency policy: a scenario approach to risk management of the Vesuvio area in Naples, Italy

    NARCIS (Netherlands)

    Concilio, Grazia; Torrieri, Francesca

    2001-01-01

    Contingency management, in particular the management of unanticipated events outside the control of an ordinary planning system, has in the last 50years become an important andfrequently debated issue in the scientific literature on complex systems management underrisk conditions. The urban system

  13. Force of habit: shrubs, trees and contingent evolution of wood anatomical diversity using Croton (Euphorbiaceae) as a model system

    Science.gov (United States)

    Rafael Arévalo; Benjamin W. van Ee; Ricarda Riina; Paul E. Berry; Alex C. Wiedenhoeft

    2017-01-01

    Background and Aims Wood is a major innovation of land plants, and is usually a central component of the body plan for two major plant habits: shrubs and trees. Wood anatomical syndromes vary between shrubs and trees, but no prior work has explicitly evaluated the contingent evolution of wood anatomical diversity in the context...

  14. 75 FR 10811 - Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource...

    Science.gov (United States)

    2010-03-09

    ... adaptive management principles; and 18. The Economic Profile System will be used as one source of demographic and economic data for the planning process, which will provide baseline data and contribute to... economic return or economic output; 15. The BLM will consider the quantity and quality of non-commodity...

  15. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Science.gov (United States)

    2010-01-01

    ... financial ratings, and participation in reliability council, power pool, regional transmission group, power... analysis and modeling of the borrower's electric system loads as provided for in the load forecast work plan. (5) A narrative discussing the borrower's past, existing, and forecast of future electric system...

  16. 75 FR 55344 - Notice of Intent To Prepare a Resource Management Plan for the Cedar City Field Office, Utah, and...

    Science.gov (United States)

    2010-09-10

    ... Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY... Environmental Impact Statement (EIS) for the Cedar City Field Office. This notice announces the beginning of the...-Beaver-Garfield-Antimony RMP (1986) and Pinyon Management Framework Plan (1983). DATES: This notice...

  17. 78 FR 39311 - Notice of Intent To Prepare a Resource Management Plan Amendment and an Associated Environmental...

    Science.gov (United States)

    2013-07-01

    ... to analyze the plan-level decision to change the Visual Resource Management (VRM) classification of... concurrently analyze the implementation-level decision of whether to deny, approve, or approve with..., botany, lands and realty, hydrology, soils, sociology, and economics. Authority: 40 CFR 1501.7 and 43 CFR...

  18. 76 FR 5607 - Notice of Intent To Prepare a Resource Management Plan for the Rock Springs Field Office, Wyoming...

    Science.gov (United States)

    2011-02-01

    .../programs/Planning/rmps/RockSprings.html ; E-mail: [email protected] ; Fax: (307) 352- 0218; or Mail... the project mailing list, contact Vera-Lynn Harrison, Project Manager, at (307) 352-0259 or Vera... address, phone number, e-mail address, or other personal identifying information in your comment, you...

  19. 75 FR 4413 - Notice of Intent to Prepare an Environmental Impact Statement for a General Management Plan...

    Science.gov (United States)

    2010-01-27

    ... also will outline the kinds of resource management activities, visitor activities, and developments... visitor-use related issues and provide management direction for the six designated wild rivers within the... Impact Statement for a General Management Plan Amendment/Wilderness Study, for Gates of the Arctic...

  20. 30 CFR 254.6 - Definitions.

    Science.gov (United States)

    2010-07-01

    ... dangerous or impossible to respond to a spill. Area Contingency Plan means an Area Contingency Plan prepared... Contingency Plan means the National Oil and Hazardous Substances Pollution Contingency Plan prepared and... Comprehensive Environmental Response Compensation and Liability Act (42 U.S.C. 9605). National Contingency Plan...

  1. The Preparation for and Execution of Engineering Operations for the Mars Curiosity Rover Mission

    Science.gov (United States)

    Samuels, Jessica A.

    2013-01-01

    The Mars Science Laboratory Curiosity Rover mission is the most complex and scientifically packed rover that has ever been operated on the surface of Mars. The preparation leading up to the surface mission involved various tests, contingency planning and integration of plans between various teams and scientists for determining how operation of the spacecraft (s/c) would be facilitated. In addition, a focused set of initial set of health checks needed to be defined and created in order to ensure successful operation of rover subsystems before embarking on a two year science journey. This paper will define the role and responsibilities of the Engineering Operations team, the process involved in preparing the team for rover surface operations, the predefined engineering activities performed during the early portion of the mission, and the evaluation process used for initial and day to day spacecraft operational assessment.

  2. NASA Contingency Shuttle Crew Support (CSCS) Medical Operations

    Science.gov (United States)

    Adams, Adrien

    2010-01-01

    The genesis of the space shuttle began in the 1930's when Eugene Sanger came up with the idea of a recyclable rocket plane that could carry a crew of people. The very first Shuttle to enter space was the Shuttle "Columbia" which launched on April 12 of 1981. Not only was "Columbia" the first Shuttle to be launched, but was also the first to utilize solid fuel rockets for U.S. manned flight. The primary objectives given to "Columbia" were to check out the overall Shuttle system, accomplish a safe ascent into orbit, and to return back to earth for a safe landing. Subsequent to its first flight Columbia flew 27 more missions but on February 1st, 2003 after a highly successful 16 day mission, the Columbia, STS-107 mission, ended in tragedy. With all Shuttle flight successes come failures such as the fatal in-flight accident of STS 107. As a result of the STS 107 accident, and other close-calls, the NASA Space Shuttle Program developed contingency procedures for a rescue mission by another Shuttle if an on-orbit repair was not possible. A rescue mission would be considered for a situation where a Shuttle and the crew were not in immediate danger, but, was unable to return to Earth or land safely. For Shuttle missions to the International Space Station (ISS), plans were developed so the Shuttle crew would remain on board ISS for an extended period of time until rescued by a "rescue" Shuttle. The damaged Shuttle would subsequently be de-orbited unmanned. During the period when the ISS Crew and Shuttle crew are on board simultaneously multiple issues would need to be worked including, but not limited to: crew diet, exercise, psychological support, workload, and ground contingency support

  3. Skype me! Socially Contingent Interactions Help Toddlers Learn Language

    OpenAIRE

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta Michnick

    2013-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This paper focuses on whether social contingency might support word learning. Toddlers aged 24- to 30-months (N=36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and non-contingent video training (yoked video). Results sugges...

  4. Recent experience in planning, packaging and preparing non-commercial spent fuel for shipment within the United States

    International Nuclear Information System (INIS)

    Johnson, P.E.; Shappert, L.B.; Turner, D.W.

    1996-01-01

    US DOE orders dictate that the aluminium clad fuels now stored at ORNL will be shipped to the Savannah River Site. A number of activities had to be carried out in order to ready the fuel for shipping, including choosing a cask capable of transporting the fuel, repackaging the fuel, developing a transportation plan, identifying the appropriate routes, and carrying out a readiness self assessment. These tasks have been successfully completed and are discussed herein

  5. Establishment of the international collaboration and licensing preparation planning for the specific design of a prototype SFR

    International Nuclear Information System (INIS)

    Kim, Y. G.; Joo, H. K.; Cho, C. H.; Yoo, J. W.; Lee, D. U.; Ahn, K. S.; Hwang, Y. S.

    2013-05-01

    The conceptual design of prototype of Gen IV SFR (PGSFR) will be early determined through the review of the international experts. After this, the technology demonstration plan and validation of fuel design will be determined in more detail. The project will be accomplished efficiently by introducing the proven technology already validated from the international collaboration. The conceptual design and its requirements of PGSFR will be reviewed by ANL, who has a lot of design experiences in the metal fueled SFR development. The collaboration with ANL has been done through Work For Others (WFO) contract, and the MOU was signed between SFRA and Terra Power(USA), and SFRA and IGCAR. The licensing issues raised during PFBR and FBTR licensing in India will be discussed and reflected into the PGSFR design by inviting the high level expert from India, for example Dr. Chetal in IGCAR. The specific design, technology validation plan and fuel development plan will be established in more detail through the annual International Technical Review Meeting (ITRM) and experimental facilities available from the international institute and companies, which will be the basis for shortening the project period and to reduce the development cost

  6. The Impact of the Contingency of Robot Feedback for HRI

    DEFF Research Database (Denmark)

    Fischer, Kerstin; Lohan, Katrin Solveig; Saunders, Joe

    2013-01-01

    robot iCub on a set of shapes and on a stacking task in two conditions, once with socially contingent, nonverbal feedback implemented in response to different gaze and looming behaviors of the human tutor, and once with non-contingent, saliency-based feedback. The results of the analysis of participants......’ linguistic behaviors in the two conditions show that contingency has an impact on the complexity and the pre-structuring of the task for the robot, i.e. on the participants’ tutoring behaviors. Contingency thus plays a considerable role for learning by demonstration....

  7. Motor contingency learning and infants with Spina Bifida.

    Science.gov (United States)

    Taylor, Heather B; Barnes, Marcia A; Landry, Susan H; Swank, Paul; Fletcher, Jack M; Huang, Furong

    2013-02-01

    Infants with Spina Bifida (SB) were compared to typically developing infants (TD) using a conjugate reinforcement paradigm at 6 months-of-age (n = 98) to evaluate learning, and retention of a sensory-motor contingency. Analyses evaluated infant arm-waving rates at baseline (wrist not tethered to mobile), during acquisition of the sensory-motor contingency (wrist tethered), and immediately after the acquisition phase and then after a delay (wrist not tethered), controlling for arm reaching ability, gestational age, and socioeconomic status. Although both groups responded to the contingency with increased arm-waving from baseline to acquisition, 15% to 29% fewer infants with SB than TD were found to learn the contingency depending on the criterion used to determine contingency learning. In addition, infants with SB who had learned the contingency had more difficulty retaining the contingency over time when sensory feedback was absent. The findings suggest that infants with SB do not learn motor contingencies as easily or at the same rate as TD infants, and are more likely to decrease motor responses when sensory feedback is absent. Results are discussed with reference to research on contingency learning in infants with and without neurodevelopmental disorders, and with reference to motor learning in school-age children with SB.

  8. Resiliency Evaluation, Assessment and Contingency Tools, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Resiliency Evaluation, Assessment and Contingency Tools (REACT) Achieving resiliency in any system requires capabilities that are beyond the boundaries of currently...

  9. The Need for a Strategic Approach to Contingency Contracting

    National Research Council Canada - National Science Library

    D'Angelo, Anthony F; Houglan, Danny H; Ruckwardt, Edwin

    2007-01-01

    ...; however, the contingency arena is often overlooked. Corporations are finding a strategic enterprise orientation to procurement can create or enhance their own competitive position within a market...

  10. Practical application of double-contingency protection

    International Nuclear Information System (INIS)

    Kent, N.A.; Sanders, C.F.

    1995-01-01

    The Westinghouse Commercial Fuel Fabrication Facility in Columbia, South Carolina, manufactures fuel assemblies and core components for the commercial nuclear power industry. The ammonium diurinate conversion process converts low-enriched ( 235 U) uranium hexafluoride (UF 6 ) or uranyl nitrate into ceramic-grade uranium dioxide (UO 2 ) powder. The UO 2 powder is then tumble blended in 1700-kg containers to ensure powder homogeneity and obtain necessary enrichments. The double-contingency principle is applied to all systems, processes, and components in which special nuclear material is processed, handled, or stored to ensure that an acceptable nuclear criticality margin of safety is maintained. The Nuclear Criticality Safety (NCS) Program at the Columbia plant is divided into three primary functions: analysis and evaluation, implementation, and compliance. The primary task in analysis and evaluation is to develop comprehensive criticality safety evaluations for all proposed new installations and system modifications. These evaluations involve identifying which of the nine physical process parameters directly affect neutron multiplication and establishing bounding assumptions and criticality safety limits (CSLs). The implementation function primarily consists of translating the open-quotes NCS-speakclose quotes (parameters, k eff , contingencies, barriers, controls, etc.) into operator language (procedural requirements, valve positions, flow rates, pressures, temperatures, etc.) and communicating this information clearly to the manufacturing function through procedures and training. The compliance function deals primarily with conducting criticality safety inspections, audits, and process upset investigations. This paper presents two examples of the challenges associated with the practical implementation of the double-contingency principle to the chemical manufacturing process at the Columbia plant

  11. Rethinking Reinforcement: Allocation, Induction, and Contingency

    Science.gov (United States)

    Baum, William M

    2012-01-01

    The concept of reinforcement is at least incomplete and almost certainly incorrect. An alternative way of organizing our understanding of behavior may be built around three concepts: allocation, induction, and correlation. Allocation is the measure of behavior and captures the centrality of choice: All behavior entails choice and consists of choice. Allocation changes as a result of induction and correlation. The term induction covers phenomena such as adjunctive, interim, and terminal behavior—behavior induced in a situation by occurrence of food or another Phylogenetically Important Event (PIE) in that situation. Induction resembles stimulus control in that no one-to-one relation exists between induced behavior and the inducing event. If one allowed that some stimulus control were the result of phylogeny, then induction and stimulus control would be identical, and a PIE would resemble a discriminative stimulus. Much evidence supports the idea that a PIE induces all PIE-related activities. Research also supports the idea that stimuli correlated with PIEs become PIE-related conditional inducers. Contingencies create correlations between “operant” activity (e.g., lever pressing) and PIEs (e.g., food). Once an activity has become PIE-related, the PIE induces it along with other PIE-related activities. Contingencies also constrain possible performances. These constraints specify feedback functions, which explain phenomena such as the higher response rates on ratio schedules in comparison with interval schedules. Allocations that include a lot of operant activity are “selected” only in the sense that they generate more frequent occurrence of the PIE within the constraints of the situation; contingency and induction do the “selecting.” PMID:22287807

  12. Investigating the Changes of Sulphate in Potabale Water of Yasuj City and preparing it's Qualitative Plan by Means of GIS Tools

    International Nuclear Information System (INIS)

    Pasereh, F.; Hasani, A.; Hoseini, N.; Javid, A.

    2016-01-01

    Water has always some soluble salts, such as sulphate. Sulphate enters the water through different resources such as, dissolved gypsum, waste water of industrial factories and automobiles smoke, dissolved in rain. Presence of sulphate in potable water has an enormous role in creating constant hardness.On the other hand Presence of sulphate with high density in drinking water, causes changes in taste and it's combination with Calcium and Magnesium anions has laxative effect. The goal of this study is to assess the amount of existing sulphate in Yasuj city potable ground water, and determining the procedure of changes in chemical parameters of sulphate and recognizing effective factors on these parameters and preparing qualitative plan for water resources for sulphate parameter by means of GIS tools. Method: In the study described above, 42 specimens in the 7 early months of the year 1387 were acquired and tested. Sulphate tests were done based on the measuring method of the instrument of Filter photometer (Model: 7000). For analysing the results, Excel software and for preparing qualitative plan, GIS software was used. Findings: This study showed that sulfate levels in water resources by reducing water level in summer and autumn and with a water level of under ground water resources increases. Discussion and Conclusion: Decrease of ground water resources of Yasuj city, causes the sulphate density to increase.

  13. Sustainability between Necessity, Contingency and Impossibility

    Directory of Open Access Journals (Sweden)

    Karl Bruckmeier

    2009-12-01

    Full Text Available Sustainable use of natural resources seems necessary to maintain functions and services of eco- and social systems in the long run. Efforts in policy and science for sustainable development have shown the splintering of local, national and global strategies. Sustainability becomes contingent and insecure with the actors´ conflicting knowledge, interests and aims, and seems even impossible through the “rebound”-effect. To make short and long term requirements of sustainability coherent requires critical, comparative and theoretical analysis of the problems met. For this purpose important concepts and theories are discussed in this review of recent interdisciplinary literature about resource management.

  14. Resource Contingency Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  15. Dissociating Contingency Awareness and Conditioned Attitudes: Evidence of Contingency-Unaware Evaluative Conditioning

    Science.gov (United States)

    Hutter, Mandy; Sweldens, Steven; Stahl, Christoph; Unkelbach, Christian; Klauer, Karl Christoph

    2012-01-01

    Whether human evaluative conditioning can occur without contingency awareness has been the subject of an intense and ongoing debate for decades, troubled by a wide array of methodological difficulties. Following recent methodological innovations, the available evidence currently points to the conclusion that evaluative conditioning effects do not…

  16. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  17. The Necessity of Contingency or Contingent Necessity: Meillassoux, Hegel, and the Subject

    Directory of Open Access Journals (Sweden)

    John Van Houdt

    2011-06-01

    Full Text Available This article addresses the relationship of contingency to necessity as developed by Quentin Meillassoux and G.W.F. Hegel. Meillassoux criticizes the restriction of possibility by modern philosophy to the conditions of the transcendental subject, which he calls ‘correlationism’, and opposes to this correlationism, mathematics as an absolute form of thought. The arch-figure of a metaphysical version of correlationism for Meillassoux is Hegel. This article argues that, while Meillassoux is right to criticize a version of correlationism for restricting the range of contingency, he overlooks Hegel’s unique contribution to this issue. Hegel provides us a version of necessity modeled on the mathematical proof which answers Meillassoux’s concerns about correlationist versions of necessity but does not altogether jettison the concept of the subject. Instead, the subject in Hegel is a contingent interruption which emerges from the breaks in the kinds of necessity we posit about the world. Hegel offers us a way of tying these two concepts together in what I call ‘contingent necessity’.

  18. Contingency in the Cosmos and the Contingency of the Cosmos : Two Theological Approaches

    NARCIS (Netherlands)

    Drees, W.B.

    Contingency in reality may be epistemic, due to incomplete knowledge or the intersection of unrelated causal trajectories. In quantum physics, it appears to be ontological. More fundamental and interesting is the limit-question ‘why is there something rather than nothing,’ pointing out the

  19. Improving advance care planning for English-speaking and Spanish-speaking older adults: study protocol for the PREPARE randomised controlled trial

    Science.gov (United States)

    Sudore, Rebecca L; Barnes, Deborah E; Le, Gem M; Ramos, Roberto; Osua, Stacy J; Richardson, Sarah A; Boscardin, John; Schillinger, Dean

    2016-01-01

    Introduction Advance care planning (ACP) is a process that allows patients to identify their goals for medical care. Traditionally, ACP has focused on completing advance directives; however, we have expanded the ACP paradigm to also prepare patients to communicate their wishes and make informed decisions. To this end, we created an ACP website called PREPARE (http://www.prepareforyourcare.org) to prepare diverse English-speaking and Spanish-speaking older adults for medical decision-making. Here, we describe the study protocol for a randomised controlled efficacy trial of PREPARE in a safety-net setting. The goal is to determine the efficacy of PREPARE to engage diverse English-speaking and Spanish-speaking older adults in a full spectrum of ACP behaviours. Methods and analysis We include English-speaking and Spanish-speaking adults from an urban public hospital who are ≥55 years old, have ≥2 chronic medical conditions and have seen a primary care physician ≥2 times in the last year. Participants are randomised to the PREPARE intervention (review PREPARE and an easy-to-read advance directive) or the control arm (only the easy-to-read advance directive). The primary outcome is documentation of an advance directive and/or ACP discussion. Secondary outcomes include ACP behaviour change processes measured with validated surveys (eg, self-efficacy, readiness) and a broad range of ACP actions (eg, choosing a surrogate, identifying goals for care, discussing ACP with clinicians and/or surrogates). Using blinded outcome ascertainment, outcomes will be measured at 1 week and at 3, 6 and 12 months, and compared between study arms using mixed-effects logistic regression and mixed-effects linear, Poisson or negative binomial regression. Ethics and dissemination This study has been approved by the appropriate Institutional Review Boards and is guided by input from patient and clinical advisory boards and a data safety monitoring board. The results of this study will

  20. Conditional Epistemic Planning

    DEFF Research Database (Denmark)

    Andersen, Mikkel Birkegaard; Bolander, Thomas; Jensen, Martin Holm

    2012-01-01

    Recent work has shown that Dynamic Epistemic Logic (DEL) offers a solid foundation for automated planning under partial observability and non-determinism. Under such circumstances, a plan must branch if it is to guarantee achieving the goal under all contingencies (strong planning). Without...... branching, plans can offer only the possibility of achieving the goal (weak planning). We show how to formulate planning in uncertain domains using DEL and give a language of conditional plans. Translating this language to standard DEL gives verification of both strong and weak plans via model checking....... In addition to plan verification, we provide a tableau-inspired algorithm for synthesising plans, and show this algorithm to be terminating, sound and complete....

  1. Frit Development Efforts for Sludge Batch 4 (SB4): Operating Window Assessments of Scenarios Leading Up to the Selected Preparation Plan for SB4

    International Nuclear Information System (INIS)

    Peeler, D

    2006-01-01

    The objective of this report is to document technical information that has been provided to Defense Waste Processing Facility (DWPF) and Closure Business Unit (CBU) personnel as part of the frit development support for Sludge Batch 4 (SB4). The information presented in this report includes projected operating windows (expressed in terms of waste loading) for various sludge blending and/or washing options coupled with candidate frits of interest. Although the Nominal Stage assessment serves as the primary tool for these evaluations, select systems were also evaluated using a Variation Stage assessment in which compositional variations were introduced. In addition, assessments of the impacts of nepheline formation potential and the SO 4 - solubility limit on the projected operating windows are also provided. Although this information was used as part of the technical basis leading to CBU's development of the preferred SB4 preparation plan, none of the options presented in this report was selected as the preferred plan. Therefore, the information is presented without significant interpretation of the resulting operating windows, but the projected windows are provided so additional insight can be explored if desired. Detailed assessments of the projected operating windows (using both Nominal and Variation Stage assessments) of the preferred sludge preparation plan with candidate frits are to be documented elsewhere. The information provided in this report is focused solely on model-based projections of the operating windows for various SB4 blending strategies of interest. Although nepheline formation potential is monitored via model predictions as a part of this assessment, experimental work investigating the impact of nepheline on glass quality is also being addressed in a parallel study. The results of this paper study and the experimental assessments of melt rate, SO 4 solubility, and/or nepheline formation potential are all critical components of the inputs into

  2. Learning, awareness, and instruction: subjective contingency awareness does matter in the colour-word contingency learning paradigm.

    Science.gov (United States)

    Schmidt, James R; De Houwer, Jan

    2012-12-01

    In three experiments, each of a set colour-unrelated distracting words was presented most often in a particular target print colour (e.g., "month" most often in red). In Experiment 1, half of the participants were told the word-colour contingencies in advance (instructed) and half were not (control). The instructed group showed a larger learning effect. This instruction effect was fully explained by increases in subjective awareness with instruction. In Experiment 2, contingency instructions were again given, but no contingencies were actually present. Although many participants claimed to be aware of these (non-existent) contingencies, they did not produce an instructed contingency effect. In Experiment 3, half of the participants were given contingency instructions that did not correspond to the correct contingencies. Participants with these false instructions learned the actual contingencies worse than controls. Collectively, our results suggest that conscious contingency knowledge might play a moderating role in the strength of implicit learning. Copyright © 2012 Elsevier Inc. All rights reserved.

  3. Significant others and contingencies of self-worth: activation and consequences of relationship-specific contingencies of self-worth.

    Science.gov (United States)

    Horberg, E J; Chen, Serena

    2010-01-01

    Three studies tested the activation and consequences of contingencies of self-worth associated with specific significant others, that is, relationship-specific contingencies of self-worth. The results showed that activating the mental representation of a significant other with whom one strongly desires closeness led participants to stake their self-esteem in domains in which the significant other wanted them to excel. This was shown in terms of self-reported contingencies of self-worth (Study 1), in terms of self-worth after receiving feedback on a successful or unsatisfactory performance in a relationship-specific contingency domain (Study 2), and in terms of feelings of reduced self-worth after thinking about a failure in a relationship-specific contingency domain (Study 3). Across studies, a variety of contingency domains were examined. Furthermore, Study 3 showed that failing in an activated relationship-specific contingency domain had negative implications for current feelings of closeness and acceptance in the significant-other relationship. Overall, the findings suggest that people's contingencies of self-worth depend on the social situation and that performance in relationship-specific contingency domains can influence people's perceptions of their relationships.

  4. Natural recharge to sustainable yield from the barind aquifer: a tool in preparing effective management plan of groundwater resources.

    Science.gov (United States)

    Monirul Islam, Md; Kanungoe, P

    2005-01-01

    This paper presents the results of water balance study and aquifer simulation modeling for preliminary estimation of the recharge rate and sustainable yield for the semi arid Barind Tract region of Bangladesh. The outcomes of the study are likely to be useful for planning purposes. It is found from detailed water balance study for the area that natural recharge rates in the Barind Tract vary widely year to year. It may have resulted from the method used for the calculation. If the considered time interval had been smaller than the monthly rainfall, the results could have been different. Aquifer Simulation Modeling (ASM) for the Barind aquifer is used to estimate long-term sustainable yield of the groundwater considering limiting drawdown from the standpoint of economic pumping cost. In managing a groundwater basin efficiently and effectively, evaluation of the maximum annual groundwater yield of the basin that can be withdrawn and used without producing any undesirable effect is one of the most important issues. In investigating such recharge rate, introduction of certain terms such as sustainable yield and safe yield has been accompanied. Development of this area involves proper utilization of this vast land, which is possible only through ensured irrigation for agriculture. The Government of Bangladesh has a plan to develop irrigation facilities by optimum utilization of available ground and surface water. It is believed that the groundwater table is lowering rapidly and the whole region is in an acute state of deforestation. Indiscriminate groundwater development may accelerate deforestation trend. In this context estimation of actual natural recharge rate to the aquifer and determination of sustainable yield will assist in proper management and planning of environmentally viable abstraction schemes. It is revealed from the study that the sustainable yield of ground water (204 mm/y) is somewhat higher than the long-term annual average recharge (152.7 mm) to the

  5. 76 FR 36857 - Federal Employees Health Benefits Program: New Premium Rating Method for Most Community Rated Plans

    Science.gov (United States)

    2011-06-23

    ... contingency reserve accounts or factored into reduced premiums for enrollees in the following plan year. Under...-TCR community rated plans' contingency reserves. Issuers failing to meet the FEHB-specific MLR... definition of medical loss ratio by HHS in December 2010, upon which this rule relies. Further, plans have...

  6. INVESTIGATION OF CONTINGENCY PATTERNS OF TEACHERS’ SCAFFOLDING IN TEACHING AND LEARNING MATHEMATICS

    Directory of Open Access Journals (Sweden)

    Anwar Anwar

    2016-12-01

    Full Text Available The purpose of this study is to investigate the patterns of scaffolding contingency in teaching and learning mathematics carried out by three teachers. Contingency patterns are obtained by examining the transcription from video recording of conversation fragments between teachers and students during the provision of scaffolding. The contingency patterns are drawn in three strategies: diagnostic strategy, intervention strategy, and checking diagnosis. The result shows that the three teachers expressed different interaction contingencies in their scaffolding activities: contingent dominant, non-contingent dominant, and pseudo-contingent. It is also found that the learning interaction performed by experienced teachers tends to be contingent dominant compared to novice teachers. Keywords: Contingency, Contingent Dominant, Non-Contingent Dominant, Pseudo Contingent, Scaffolding DOI: http://dx.doi.org/10.22342/jme.8.1.3410.65-76

  7. SU-E-T-633: Preparation and Planning of a VMAT Multi - Arc Radiation Therapy Technique for Full Scalp Treatment

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, C; Bardock, A; Berkelaar, S; Gillund, D; McGee, K; Mohamed, I; Lapointe, C [British Columbia Cancer Agency, Kelowna, BC (Canada)

    2015-06-15

    Purpose: The target volume for angiosarcoma of the scalp encompasses the entire scalp. Full scalp radiotherapy (FSRT) requires careful design of required bolus, immobilization and marking of the field before the patient CT is acquired. A VMAT multi-arc technique was designed to deliver FSRT for a patient with angiosarcoma of the scalp to a dose of 6000cGy in 25 fractions. Methods: A custom bolus helmet was fabricated from a 0.5 cm thick sheet of aquaplast material, which was molded to the patient’s head. With the bolus helmet in place the patient was then positioned supine on a H&N immobilization board. A custom vaclock bag positioned on a standard headrest and a thermoplastic mask were used to immobilize the patient. Additional bolus to cover the remaining treatment area was attached to the mask. We acquired two CT scans of the patient’s head, one in treatment position and an additional scan without the immobilization mask with wires marking the treatment area that the oncologist had delineated on the patient’s skin. The second scan was registered to the first and used to define the treatment CTV. A four-arc VMAT treatment planned using Varian-Eclipse was optimized to cover the skin with a PTV margin while sparing the brain and limiting the dose to the optic apparatus and lacrimal glands. Daily treatment setup was verified using anterior and lateral kV on-board-imaging. To verify the treated dose, TLDs were positioned on the patient’s scalp during one fraction. Results: With full dose coverage to the PTV, the mean dose to the brain was less than 24 Gy. The dose measured by the TLDs (mean difference 1%, standard deviation 4%)showed excellent agreement with the treatment planning calculation. Conclusion: FSRT delivered with a bolus helmet and a VMAT multi-arc technique can be accurately delivered with high dose uniformity and conformality.

  8. SU-E-T-633: Preparation and Planning of a VMAT Multi - Arc Radiation Therapy Technique for Full Scalp Treatment

    International Nuclear Information System (INIS)

    Araujo, C; Bardock, A; Berkelaar, S; Gillund, D; McGee, K; Mohamed, I; Lapointe, C

    2015-01-01

    Purpose: The target volume for angiosarcoma of the scalp encompasses the entire scalp. Full scalp radiotherapy (FSRT) requires careful design of required bolus, immobilization and marking of the field before the patient CT is acquired. A VMAT multi-arc technique was designed to deliver FSRT for a patient with angiosarcoma of the scalp to a dose of 6000cGy in 25 fractions. Methods: A custom bolus helmet was fabricated from a 0.5 cm thick sheet of aquaplast material, which was molded to the patient’s head. With the bolus helmet in place the patient was then positioned supine on a H&N immobilization board. A custom vaclock bag positioned on a standard headrest and a thermoplastic mask were used to immobilize the patient. Additional bolus to cover the remaining treatment area was attached to the mask. We acquired two CT scans of the patient’s head, one in treatment position and an additional scan without the immobilization mask with wires marking the treatment area that the oncologist had delineated on the patient’s skin. The second scan was registered to the first and used to define the treatment CTV. A four-arc VMAT treatment planned using Varian-Eclipse was optimized to cover the skin with a PTV margin while sparing the brain and limiting the dose to the optic apparatus and lacrimal glands. Daily treatment setup was verified using anterior and lateral kV on-board-imaging. To verify the treated dose, TLDs were positioned on the patient’s scalp during one fraction. Results: With full dose coverage to the PTV, the mean dose to the brain was less than 24 Gy. The dose measured by the TLDs (mean difference 1%, standard deviation 4%)showed excellent agreement with the treatment planning calculation. Conclusion: FSRT delivered with a bolus helmet and a VMAT multi-arc technique can be accurately delivered with high dose uniformity and conformality

  9. Application of the double-contingency principle within BNFL

    International Nuclear Information System (INIS)

    Strafford, P.I.D.

    1995-01-01

    Historically, the double-contingency principle has been used for criticality assessment within British Nuclear Fuels plc (BNFL). This paper outlines what is understood by the double-contingency principle to illustrate how it is applied in criticality safety assessments and to highlight various problem areas that are encountered and, where possible, how they might be solved

  10. The Role of Feedback Contingency in Perceptual Category Learning

    Science.gov (United States)

    Ashby, F. Gregory; Vucovich, Lauren E.

    2016-01-01

    Feedback is highly contingent on behavior if it eventually becomes easy to predict, and weakly contingent on behavior if it remains difficult or impossible to predict even after learning is complete. Many studies have demonstrated that humans and nonhuman animals are highly sensitive to feedback contingency, but no known studies have examined how feedback contingency affects category learning, and current theories assign little or no importance to this variable. Two experiments examined the effects of contingency degradation on rule-based and information-integration category learning. In rule-based tasks, optimal accuracy is possible with a simple explicit rule, whereas optimal accuracy in information-integration tasks requires integrating information from two or more incommensurable perceptual dimensions. In both experiments, participants each learned rule-based or information-integration categories under either high or low levels of feedback contingency. The exact same stimuli were used in all four conditions and optimal accuracy was identical in every condition. Learning was good in both high-contingency conditions, but most participants showed little or no evidence of learning in either low-contingency condition. Possible causes of these effects are discussed, as well as their theoretical implications. PMID:27149393

  11. Baseline Response Levels Are a Nuisance in Infant Contingency Learning

    Science.gov (United States)

    Millar, W. S.; Weir, Catherine

    2015-01-01

    The impact of differences in level of baseline responding on contingency learning in the first year was examined by considering the response acquisition of infants classified into baseline response quartiles. Whereas the three lower baseline groups showed the predicted increment in responding to a contingency, the highest baseline responders did…

  12. CW-FIT: Group Contingency Effects across the Day

    Science.gov (United States)

    Wills, Howard P.; Iwaszuk, Wendy M.; Kamps, Debra; Shumate, Emily

    2014-01-01

    This study explored the effects of a group-contingency intervention on student behavior across academic instructional periods. Research suggests group contingencies are evidence-based practices, yet calls for investigation to determine the best conditions and groups suited for this type of intervention. CW-FIT (Class-Wide Function-related…

  13. Roentgenologic characteristic of 7 group contingent of dispensary registration

    International Nuclear Information System (INIS)

    Derzhavin, V.I.; Nalivajko, N.N.; Kozlova, L.N.; Petrik, R.N.

    1984-01-01

    9694 persons of 7 group contingent of dispensary registration were examined. Roentgenologic study of posttuberculous changes of 7 group contingent of dispensary registration showed that in people of 7-A subgroup prevail processes of secondary genesis (79.4%) and in people of 7-B subgroup - of primary genesis (55.8%). Consequences of secondary tuberculosis are most recurring

  14. Relative speed of processing determines color-word contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2017-10-01

    In three experiments, we tested a relative-speed-of-processing account of color-word contingency learning, a phenomenon in which color identification responses to high-contingency stimuli (words that appear most often in particular colors) are faster than those to low-contingency stimuli. Experiment 1 showed equally large contingency-learning effects whether responding was to the colors or to the words, likely due to slow responding to both dimensions because of the unfamiliar mapping required by the key press responses. For Experiment 2, participants switched to vocal responding, in which reading words is considerably faster than naming colors, and we obtained a contingency-learning effect only for color naming, the slower dimension. In Experiment 3, previewing the color information resulted in a reduced contingency-learning effect for color naming, but it enhanced the contingency-learning effect for word reading. These results are all consistent with contingency learning influencing performance only when the nominally irrelevant feature is faster to process than the relevant feature, and therefore are entirely in accord with a relative-speed-of-processing explanation.

  15. The double-contingency principle: An historical perspective

    International Nuclear Information System (INIS)

    Knief, R.A.

    1995-01-01

    Standard ANSI/ANS-8.1 states the double contingency principle as: Process designs should, in general, incorporate sufficient factors of safety to require at least two unlikely, independent, and concurrent changes in process conditions before a criticality accident is possible. This paper presents a perspective on the double contingency principle

  16. Appraisal of the Performance of Contingency Cost Provision for ...

    African Journals Online (AJOL)

    The paper appraised performance of contingency allowance in addressing projects' cost risk. To achieve this aim, impact of contingency provision in some selected building projects were evaluated. Data for the study was collected by means of checklist from 40 completed projects' files. Furthermore, 100 questionnaires on ...

  17. Analisa Kemampuan Saluran Berdasarkan Metode Contingency N-1 Analysis

    OpenAIRE

    Syukriyadin,; Susanti, Rahmi

    2010-01-01

    Sistem transmisi memegang peranan yang sangatpenting dalam proses penyaluran daya. Oleh karena itupengamanan pada saluran transmisi perlu mendapatperhatian yang serius dalam perencanaannya. Analisakemampuan saluran merupakan aplikasi untuk mempelajarikestabilan sistem. Analisa kemampuan saluran dalampenelitian ini menggunakan metode contingency N-1 analysis.Contingency N-1 analysis merupakan sebuah program untukmemperhitungkan berbagi kondisi yang mungkin terjadidalam sistem dimasa yang akan ...

  18. The Role of Relational Information in Contingent Capture

    Science.gov (United States)

    Becker, Stefanie I.; Folk, Charles L.; Remington, Roger W.

    2010-01-01

    On the contingent capture account, top-down attentional control settings restrict involuntary attentional capture to items that match the features of the search target. Attention capture is involuntary, but contingent on goals and intentions. The observation that only target-similar items can capture attention has usually been taken to show that…

  19. EM Health and Safety Plan Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document contains information about the Health and Safety Plan Guidelines. Topics discussed include: Regulatory framework; key personnel; hazard assessment; training requirements; personal protective equipment; extreme temperature disorders or conditions; medical surveillance; exposure monitoring/air sampling; site control; decontamination; emergency response/contingency plan; emergency action plan; confined space entry; and spill containment.

  20. Preparing Canada's power systems for transition to the year 2000: the Y2K programs of Canada's electric utility companies: province-by-province report

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-09-01

    The province-by-province report covers BC Hydro; TransAlta, ATCO Ltd., EPCOR, and Enmax, SaskPower, Manitoba Hydro, Winnipeg Hydro, Ontario Power Generation, Ontario Hydro Services Company, Toronto Hydro, Hydro-Quebec and Energie Maclaren, Newfoundland and Labrador Hydro, Newfoundland Power, Nova Scotia Power, Maritime Electric,Yukon and Northwest Territories,Yukon Electrical Company Ltd., Northland Utilities (Yellowknife) Ltd. and Northland Utilities (NWT) Ltd. A report typically deals with inventory, testing and remediation of business systems, inventory, testing and remediation of operational control devices, business partner reviews, and preparation and exercising of contingency plans, as well as Y2K status and readiness reports, and dateline preparations.

  1. Skype me! Socially Contingent Interactions Help Toddlers Learn Language

    Science.gov (United States)

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta Michnick

    2013-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This paper focuses on whether social contingency might support word learning. Toddlers aged 24- to 30-months (N=36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and non-contingent video training (yoked video). Results suggest that children only learned novel verbs in socially contingent interactions (live interactions and video chat). The current study highlights the importance of social contingency in interactions for language learning and informs the literature on learning through screen media as the first study to examine word learning through video chat technology. PMID:24112079

  2. QV modal distance displacement - a criterion for contingency ranking

    Energy Technology Data Exchange (ETDEWEB)

    Rios, M.A.; Sanchez, J.L.; Zapata, C.J. [Universidad de Los Andes (Colombia). Dept. of Electrical Engineering], Emails: mrios@uniandes.edu.co, josesan@uniandes.edu.co, cjzapata@utp.edu.co

    2009-07-01

    This paper proposes a new methodology using concepts of fast decoupled load flow, modal analysis and ranking of contingencies, where the impact of each contingency is measured hourly taking into account the influence of each contingency over the mathematical model of the system, i.e. the Jacobian Matrix. This method computes the displacement of the reduced Jacobian Matrix eigenvalues used in voltage stability analysis, as a criterion of contingency ranking, considering the fact that the lowest eigenvalue in the normal operation condition is not the same lowest eigenvalue in N-1 contingency condition. It is made using all branches in the system and specific branches according to the IBPF index. The test system used is the IEEE 118 nodes. (author)

  3. Breaking the Myth of Flexible Work: Contingent Work in Toronto. A Study Conducted by the Contingent Workers Project.

    Science.gov (United States)

    de Wolff, Alice

    A survey of 205 people, 4 group interviews with approximately 30 people, and 6 design and analysis meetings involving approximately 40 people were conducted in a 1999 participatory study of contingent workers in Toronto. (Contingent work was defined to be lower-waged forms of non-permanent work arrangements that include contracting, employment…

  4. Contingent negative variation of mood disorder patients

    Institute of Scientific and Technical Information of China (English)

    Yingzhi Lu; Wenbin Zong; Qingtao Ren; Jinyu Pu; Jun Chen; Juan Li; Xingshi Chen; Yong Wang

    2011-01-01

    Studies on brain-evoked potential and contingent negative variation (CNV) in mood disorder remain controversial. To date, no CNV difference between unipolar and bipolar depression has been reported. Brain-evoked potentials were measured in the present study to analyze CNV in three subtypes of mood disorder (mania, unipolar depression, and bipolar depression), and these results were compared with normal controls. In the mania group, CNV amplitude B was greater than in controls, and the depression group exhibited lower CNV amplitude B and smaller A-S'2 area, and prolonged post-imperative negative variation latency. The CNV comparison between unipolar and bipolar depression found that the prolonged post-imperative negative variation latency was only in unipolar depression. These results suggest that prolonged post-imperative negative variation latency is a characteristic of unipolar depression, and CNV amplitude change is a state characteristic of mood disorder patients.

  5. Social contingencies, the aged, and public policy.

    Science.gov (United States)

    Hudson, R B

    1993-01-01

    Today's older population is notably different than it was a few decades ago, both in well-being and in diversity, a shift that must be acknowledged in public policy. The U.S. social insurance system overprotects against highly likely, predictable, and nonvolatile events at the expense of more unlikely, potentially catastrophic, and less volatile events. The public sector, therefore, should move toward proportionally emphasizing health-related, functionally impairing events rather than income maintenance; the private sector is better suited to insuring against predictable and nonvolatile old-age events. A contingent event scheme would: (a) encourage the growth of long-term-care insurance; (b) help bridge the gap between those arguing for greater "efficiencies" in social welfare spending and those pressing for new universal benefits; and (c) bring a new perspective to the "generational equity" debate.

  6. Historical contingency in fluviokarst landscape evolution

    Science.gov (United States)

    Phillips, Jonathan D.

    2018-02-01

    Lateral and vertical erosion at meander bends in the Kentucky River gorge area has created a series of strath terraces on the interior of incised meander bends. These represent a chronosequence of fluviokarst landscape evolution from the youngest valley side transition zone near the valley bottom to the oldest upland surface. This five-part chronosequence (not including the active river channel and floodplain) was analyzed in terms of the landforms that occur at each stage or surface. These include dolines, uvalas, karst valleys, pocket valleys, unincised channels, incised channels, and cliffs (smaller features such as swallets and shafts also occur). Landform coincidence analysis shows higher coincidence indices (CI) than would be expected based on an idealized chronosequence. CI values indicate genetic relationships (common causality) among some landforms and unexpected persistence of some features on older surfaces. The idealized and two observed chronosequences were also represented as graphs and analyzed using algebraic graph theory. The two field sites yielded graphs more complex and with less historical contingency than the idealized sequence. Indeed, some of the spectral graph measures for the field sites more closely approximate a purely hypothetical no-historical-contingency benchmark graph. The deviations of observations from the idealized expectations, and the high levels of graph complexity both point to potential transitions among landform types as being the dominant phenomenon, rather than canalization along a particular evolutionary pathway. As the base level of both the fluvial and karst landforms is lowered as the meanders expand, both fluvial and karst denudation are rejuvenated, and landform transitions remain active.

  7. Comparison of accuracy in predicting emotional instability from MMPI data: fisherian versus contingent probability statistics

    Energy Technology Data Exchange (ETDEWEB)

    Berghausen, P.E. Jr.; Mathews, T.W.

    1987-01-01

    The security plans of nuclear power plants generally require that all personnel who are to have access to protected areas or vital islands be screened for emotional stability. In virtually all instances, the screening involves the administration of one or more psychological tests, usually including the Minnesota Multiphasic Personality Inventory (MMPI). At some plants, all employees receive a structured clinical interview after they have taken the MMPI and results have been obtained. At other plants, only those employees with dirty MMPI are interviewed. This latter protocol is referred to as interviews by exception. Behaviordyne Psychological Corp. has succeeded in removing some of the uncertainty associated with interview-by-exception protocols by developing an empirically based, predictive equation. This equation permits utility companies to make informed choices regarding the risks they are assuming. A conceptual problem exists with the predictive equation, however. Like most predictive equations currently in use, it is based on Fisherian statistics, involving least-squares analyses. Consequently, Behaviordyne Psychological Corp., in conjunction with T.W. Mathews and Associates, has just developed a second predictive equation, one based on contingent probability statistics. The particular technique used in the multi-contingent analysis of probability systems (MAPS) approach. The present paper presents a comparison of predictive accuracy of the two equations: the one derived using Fisherian techniques versus the one thing contingent probability techniques.

  8. Comparison of accuracy in predicting emotional instability from MMPI data: fisherian versus contingent probability statistics

    International Nuclear Information System (INIS)

    Berghausen, P.E. Jr.; Mathews, T.W.

    1987-01-01

    The security plans of nuclear power plants generally require that all personnel who are to have access to protected areas or vital islands be screened for emotional stability. In virtually all instances, the screening involves the administration of one or more psychological tests, usually including the Minnesota Multiphasic Personality Inventory (MMPI). At some plants, all employees receive a structured clinical interview after they have taken the MMPI and results have been obtained. At other plants, only those employees with dirty MMPI are interviewed. This latter protocol is referred to as interviews by exception. Behaviordyne Psychological Corp. has succeeded in removing some of the uncertainty associated with interview-by-exception protocols by developing an empirically based, predictive equation. This equation permits utility companies to make informed choices regarding the risks they are assuming. A conceptual problem exists with the predictive equation, however. Like most predictive equations currently in use, it is based on Fisherian statistics, involving least-squares analyses. Consequently, Behaviordyne Psychological Corp., in conjunction with T.W. Mathews and Associates, has just developed a second predictive equation, one based on contingent probability statistics. The particular technique used in the multi-contingent analysis of probability systems (MAPS) approach. The present paper presents a comparison of predictive accuracy of the two equations: the one derived using Fisherian techniques versus the one thing contingent probability techniques

  9. 11. Strategic planning.

    Science.gov (United States)

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  10. Resurgence of instrumental behavior after an abstinence contingency.

    Science.gov (United States)

    Bouton, Mark E; Schepers, Scott T

    2014-06-01

    In resurgence, an extinguished instrumental behavior (R1) recovers when a behavior that has replaced it (R2) is also extinguished. The phenomenon may be relevant to understanding relapse that can occur after the termination of "contingency management" treatments, in which an unwanted behavior (e.g., substance abuse) is reduced by reinforcing an alternative behavior. When reinforcement is discontinued, the unwanted behavior might resurge. However, unlike most resurgence experiments, contingency management treatments also introduce a negative contingency, in which reinforcers are not delivered unless the client has abstained from the unwanted behavior. In two experiments with rats, we therefore examined the effects of adding a negative "abstinence" contingency to the resurgence design. During response elimination, R2 was not reinforced unless R1 had not been emitted for a minimum period of time (45, 90, or 135 s). In both experiments, adding such a contingency to simple R1 extinction reduced, but did not eliminate, resurgence. In Experiment 2, we found the same effect in a yoked group that could earn reinforcers for R2 at the same points in time as the negative-contingency group, but without the requirement to abstain from R1. Thus, the negative contingency per se did not contribute to the reduction in resurgence. These results suggest that the contingency reduced resurgence by making reinforcers more difficult to earn and more widely spaced in time. This could have allowed the animal to learn that R1 was extinguished in the "context" of infrequent reinforcement-a context more like that of resurgence testing. The results are thus consistent with a contextual (renewal) account of resurgence. The method might provide a better model of relapse after termination of a contingency management treatment.

  11. Application of the IPEBS method to dynamic contingency analysis

    Energy Technology Data Exchange (ETDEWEB)

    Martins, A C.B. [FURNAS, Rio de Janeiro, RJ (Brazil); Pedroso, A S [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    1994-12-31

    Dynamic contingency analysis is certainly a demanding task in the context of dynamic performance evaluation. This paper presents the results of a test for checking the contingency screening capability of the IPEBS method. A brazilian 1100-bus, 112-gen system was used in the test; the ranking of the contingencies based on critical clearing times obtained with IPEBS, was compared with the ranking derived from detailed time-domain simulation. The results of this comparison encourages us to recommended the use of the method in industry applications, in a complementary basis to the current method of time domain simulation. (author) 5 refs., 1 fig., 2 tabs.

  12. Waste feed delivery planning at Hanford-13232

    International Nuclear Information System (INIS)

    Certa, Paul J.; West, Elizha B.; Rodriguez, Juissepp S.; Hohl, Ted M.; Larsen, Douglas C.; Ritari, Jaakob S.; Kelly, James W.

    2013-01-01

    The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades

  13. Waste Feed Delivery Planning at Hanford - 13232

    International Nuclear Information System (INIS)

    Certa, Paul J.; Hohl, Ted M.; Kelly, James W.; Larsen, Douglas C.; West, Elizha B.; Ritari, Jaakob S.; Rodriguez, Juissepp S.

    2013-01-01

    The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades. (authors)

  14. Waste Feed Delivery Planning at Hanford - 13232

    Energy Technology Data Exchange (ETDEWEB)

    Certa, Paul J.; Hohl, Ted M.; Kelly, James W.; Larsen, Douglas C.; West, Elizha B.; Ritari, Jaakob S.; Rodriguez, Juissepp S. [Washington River Protection Solutions, LLC, P.O. 850, Richland, WA 99352 (United States)

    2013-07-01

    The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades. (authors)

  15. 40 CFR 300.205 - Planning and coordination structure.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Planning and coordination structure. 300.205 Section 300.205 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.205 Planning and coordination structure. (a...

  16. 25 CFR 39.502 - How does a school apply for contingency funds?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How does a school apply for contingency funds? 39.502... EQUALIZATION PROGRAM Contingency Fund § 39.502 How does a school apply for contingency funds? To apply for contingency funds, a school must send a request to the ELO. The ELO must send the request to the Director for...

  17. 25 CFR 39.503 - How can a school use contingency funds?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How can a school use contingency funds? 39.503 Section 39.503 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contingency Fund § 39.503 How can a school use contingency funds? Contingency funds can be...

  18. 48 CFR 403.405 - Misrepresentations or violations of the Covenant Against Contingent Fees.

    Science.gov (United States)

    2010-10-01

    ... violations of the Covenant Against Contingent Fees. 403.405 Section 403.405 Federal Acquisition Regulations... Contingent Fees 403.405 Misrepresentations or violations of the Covenant Against Contingent Fees. (a) A suspected misrepresentation or violation of the Covenant Against Contingent Fees shall be documented in...

  19. An analysis of contingencies for making casks available for use during the early years of Federal Waste Management System operations

    International Nuclear Information System (INIS)

    Johnson, P.E.; Joy, D.S.; Pope, R.B.; Shappert, L.B.; Wankerl, M.W.; Best, R.E.; Schmid, S.; Danese, F.L.

    1992-01-01

    A study has been performed to examine the contingencies that could be pursued by the Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) for shipping spent fuel beginning in 1998. OCRWM's current plan is to initiate operations using early production units of Initiative I truck and rail/barge casks that are presently being designed. Contingencies to this plan were considered in case some unforeseen event occurs that precludes the Initiative I casks from entering into service early in 1998 in sufficient quantities (both numbers and types) to satisfy DOE's shipping needs. Specifically, the study addressed the potential availability of cask systems, selected several cask usage scenarios, determined the requirements for casks under these scenarios, generically assessed different strategies for acquiring casks or the use of casks, and generically assessed cask fabrication capabilities. Issues concerning both domestic and foreign resources were addressed with a focus on the first five years of Federal Waste Management System (FWMS) operation

  20. Contingency Management and deliberative decision-making processes

    Directory of Open Access Journals (Sweden)

    Paul S. Regier

    2015-06-01

    Full Text Available Contingency Management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of Contingency Management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that Contingency Management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by Contingency Management, and suggests improvements in its implementation.