WorldWideScience

Sample records for preparatory commission prepcom

  1. NPT: the issues facing the Geneva PrepCom

    International Nuclear Information System (INIS)

    Hautecouverture, Benjamin

    2013-04-01

    The second session of the Preparatory Committee (PrepCom) for the 2015 Review Conference of the Parties to the Treaty on the Non- Proliferation of Nuclear Weapons (NPT) will meet from 22 April-3 May 2013 in Geneva, and will be chaired by Ambassador Cornel Feruta of Romania. Three years on from the adoption by consensus at the end of the 8. NPT Review Conference in New York of an Action Plan on non-proliferation, disarmament, and peaceful uses of nuclear energy - the three pillars of the NPT - as well as the Middle East, this session provides the opportunity both to take stock of the commitments undertaken in 2010 and to prepare the ground for the 2015 meeting. It is first worth noting that the beginning of the 9. five-year NPT review cycle in Vienna last year was marked by tangible optimism and revealed a constructive mindset on the part of the 110 delegations present. This was largely to be expected as a result of the success of the 2010 Review Conference. The two final PrepComs of 2010 cycle (Geneva in 2008 and New York in 2009) were also deemed a success by the delegations present, characterised by the rich and constructive nature of the discussion. Overall, the tension that marred the 2005 cycle has eased over the last few years. Yet, this positive development is sadly insufficient to ensure that the Treaty remains topical. Regarding the commitments undertaken in 2010 under the Action Plan, it is well known that it was impossible for the States concerned to come together in 2012 at a conference on establishment of a weapon-of-mass-destruction-free zone (WMDFZ) in the Middle East (chapter 4, 'The Middle East, particularly implementation of the 1995 Resolution on the Middle East'). Nevertheless, in accordance with the Action Plan, H.E. Mr Jaakko Laajava was appointed as the facilitator, Finland was named as the host country, and a rigorous consultative process is underway. Moreover, the EU has maintained its commitment to support this process by

  2. Resolution establishing the Preparatory Commission for the Comprehensive Nuclear Test-Ban Treaty Organization. Adopted on 19 November 1996

    International Nuclear Information System (INIS)

    1996-11-01

    The document reproduces the text of the Resolution on the Establishment of a Preparatory Commission for the Comprehensive Nuclear Test-Ban Treaty Organization which was adopted on 19 November 1996 at a meeting of the States Signatories of the Comprehensive Nuclear Test-Ban Treaty

  3. Objectives and Activities. Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization

    International Nuclear Information System (INIS)

    2007-04-01

    The Treaty provides for a comprehensive global verification regime, which consists of an International Monitoring System (IMS), consultation and clarification procedures, provisions for requesting on-site inspections, and confidence-building measures. The present verification regime is the result of many years of negotiations led by an international Group of Scientific Experts (GSE) at the Conference on Disarmament in Geneva to ensure that non-compliance with the provisions of the Treaty can be detected in a timely manner. The 337 IMS monitoring facilities (170 seismic, 11 hydroacoustic, 60 infrasound, 80 radionuclide stations and 16 radionuclide laboratories) are located all over the world including in some of the most remote regions such as the Arctic and Antarctica. The seismic, hydroacoustic, infrasound and radionuclide monitoring technologies are designed to register sound and energy vibrations underground, in the sea and in the air, and to detect radionuclides released into the atmosphere. IMS data is collected and transmitted via the state-of-the-art, satellite-based Global Communications Infrastructure (GCI) to the International Data Centre (IDC) at the Commission's headquarters in Vienna. Here the data are processed and, together with IDC products such as Reviewed Event Bulletins and other event screening services, released to Member States for final analysis.

  4. Consensus builds on population policy as ICPD PrepCom meetings conclude. Vatican objections firm and vocal.

    Science.gov (United States)

    1994-04-29

    In April, 1994, at UN headquarters in New York, delegates from almost 200 countries and nongovernmental organizations (NGOs) negotiated a Programme of Action to be ratified following more debate at the International Conference on Population and Development in Cairo in September. A sizable consensus emerged for this Preparatory Committee III (PrepCom) meeting. It has an expanded view of population policy that centers more on meeting individual needs and less on achieving strict demographic goals. Thus, it focuses on the unmet need for reproductive health services (family planning, basic women's health care, and services linked to sexually transmitted diseases). It considers women's status and female education as being important themselves as well as key determinants of fertility rates. Disagreement over access to abortion services and reproductive health services for adolescents remain. Unlike earlier world conferences, most of the world is working towards a consensus, while the Vatican and just a few small countries (Benin, Malta, Honduras, and Nicaragua) object to these services. Some topics that US National Conference of Catholic Bishops did not want in the Programme of Action were references to reducing the incidence of unsafe abortion, promoting condom use to prevent HIV/AIDS, and even safe motherhood. The US and Japan have committed sizable increases in population assistance. Some European countries are concerned about how their contributions would be allocated. US Undersecretary for Global Affairs and a mostly female 23-member US delegation attended PrepCom III. Most of the US delegates were from NGOs. Many country delegates were women. Many countries accepted recommendations of the women's caucus. The US's priorities are promotion of universal access to the full range of high quality family planning and reproductive health services; increasing women's status; child survival promotion; serving adolescent needs; augmenting the role and responsibility of men in

  5. "PrepCom" ends with U.S. vow to expand pop programs; House panels act on UNFPA.

    Science.gov (United States)

    1993-05-28

    Delegates to Prepcom II have just completed the new World Population Plan of Action (WPP), which provides goals and a structural outline for action. The WPP will be presented at the International Conference on Population and Development in Cairo in September, 1994. Prepcom will meet again in April, 1994 in New York. The Conference chair, Dr. Fred Sai of Ghana, remarked that there was unprecedented agreement, even on abortion. Debate on the new plan centered on the US delegation's objection to the inclusion of a new chapter on "The Family" which might be construed to imply that there is one notion of family type. US concern was also directed to the omission of "environment" from many chapter headings. The stalemate was broken when the chairman agreed to present the entire outline to the plenary as the "chairman's summary." Substantive chapters were to be devoted to the following: the interrelationships between population, sustained economic growth, and sustainable development; gender equality and empowerment of women; population growth and structure; the family, its role and composition; reproductive rights, reproductive health, and family planning, health and mortality; and population distribution, urbanization, and internal migration. The US delegation representative remarked that there was an expressed appreciation for the complex links among population, environment, consumption, migration, and development. These issues need to be considered from the standpoint of people, especially women, who are affected the most. There was a promise to increase the effort to broaden US support for reproductive health, family planning, and population programs in its foreign assistance budget. In the deliberations about the State Department authorization bill to restore funding for the UN Family Planning Association (UNFPA), a motion carried to withhold $13.8 million from the $50 million authorized for UNFPA in each of fiscal years 1994 and 1995, unless President Clinton

  6. Achievements

    Digital Repository Service at National Institute of Oceanography (India)

    Banakar, V.K.

    A historic decision was taken by the Preparatory Commission of the International Seabed Authority (PRE-PCOM) on 17 th August 1987 It was decided to allocate to India exclusive rights for the exploration of polymetallic nodules in an area of about...

  7. Preparatory attention in visual cortex.

    Science.gov (United States)

    Battistoni, Elisa; Stein, Timo; Peelen, Marius V

    2017-05-01

    Top-down attention is the mechanism that allows us to selectively process goal-relevant aspects of a scene while ignoring irrelevant aspects. A large body of research has characterized the effects of attention on neural activity evoked by a visual stimulus. However, attention also includes a preparatory phase before stimulus onset in which the attended dimension is internally represented. Here, we review neurophysiological, functional magnetic resonance imaging, magnetoencephalography, electroencephalography, and transcranial magnetic stimulation (TMS) studies investigating the neural basis of preparatory attention, both when attention is directed to a location in space and when it is directed to nonspatial stimulus attributes (content-based attention) ranging from low-level features to object categories. Results show that both spatial and content-based attention lead to increased baseline activity in neural populations that selectively code for the attended attribute. TMS studies provide evidence that this preparatory activity is causally related to subsequent attentional selection and behavioral performance. Attention thus acts by preactivating selective neurons in the visual cortex before stimulus onset. This appears to be a general mechanism that can operate on multiple levels of representation. We discuss the functional relevance of this mechanism, its limitations, and its relation to working memory, imagery, and expectation. We conclude by outlining open questions and future directions. © 2017 New York Academy of Sciences.

  8. Improving the training process of highly skilled bodybuilders in the preparatory period, general preparatory phase

    Directory of Open Access Journals (Sweden)

    Olexandr Tyhorskyy

    2015-08-01

    Full Text Available Purpose: to improve the method of training highly skilled bodybuilders during the general preparatory phase. Material and Methods: the study involved eight highly skilled athletes, members of the team of Ukraine on bodybuilding. Results: comparative characteristics of the most commonly used methods of training process in bodybuilding. Developed and substantiated the optimal method of training highly skilled bodybuilders during the general preparatory phase of the preparatory period, which can increase body weight through muscle athletes component. Conclusions: based on studies, recommended the optimum method of training highly skilled bodybuilders depending on mezotsykles and microcycles general preparatory phase

  9. Neural systems for preparatory control of imitation.

    Science.gov (United States)

    Cross, Katy A; Iacoboni, Marco

    2014-01-01

    Humans have an automatic tendency to imitate others. Previous studies on how we control these tendencies have focused on reactive mechanisms, where inhibition of imitation is implemented after seeing an action. This work suggests that reactive control of imitation draws on at least partially specialized mechanisms. Here, we examine preparatory imitation control, where advance information allows control processes to be employed before an action is observed. Drawing on dual route models from the spatial compatibility literature, we compare control processes using biological and non-biological stimuli to determine whether preparatory imitation control recruits specialized neural systems that are similar to those observed in reactive imitation control. Results indicate that preparatory control involves anterior prefrontal, dorsolateral prefrontal, posterior parietal and early visual cortices regardless of whether automatic responses are evoked by biological (imitative) or non-biological stimuli. These results indicate both that preparatory control of imitation uses general mechanisms, and that preparatory control of imitation draws on different neural systems from reactive imitation control. Based on the regions involved, we hypothesize that preparatory control is implemented through top-down attentional biasing of visual processing.

  10. The Commission as a party before the Court – Reflections on the ...

    African Journals Online (AJOL)

    The African Commission on Human and Peoples' Rights has worked as the ... of the African Commission's mandate to refer communications to the African Court. ... the understanding of the principle of complementarity in the preparatory works.

  11. Second meeting of the ITER Preparatory Committee

    International Nuclear Information System (INIS)

    Drew, M.

    2003-01-01

    The committee charged to oversee the ITER ITA (ITER transitional arrangements) the ITER preparatory committee, held its second meeting on 24 September at the JET facilities at Culham, UK. Dr. Umberto Finzi of the European Commission was chairman. This meeting was also the first since the succession by Dr. Yasuo Shimomura to Dr. Robert Aymar as Interim Project Leader (IPL). Welcoming Dr. Shimomura in his new capacity, the Committee paid tribute to the outstanding contributions of his predecessor to the definition, design and promotion of ITER, and expressed the gratitude of all Participants to Dr. Aymar and its best wishes for future success in his new appointment.The technical activities of the ITA were the main focus of the Committee's discussions. The Committee took note of the IPL's Status Report on ITA Technical Activities and endorsed the IPL's proposals for the top level structure of the International Team, including the designation of Dr. Pietro Barabaschi as Deputy to the IPL. The Committee took note of the IPL's proposals on Participants' contributions to the ITA and of the Participants' stated intentions and expectations in this regard. Several Delegations pointed out that access to necessary resources would depend strongly on progress made towards the Agreement. All Participants were invited, in the shared interests of the project, to respond constructively to the specific technical areas where the IPL reported a lack of resources. Following a presentation from the IT on Project Management Tools, the Committee expressed support, in general, for the proposed strategy designed to provide the current team with the CAD and Data Management elements necessary to prepare for an efficient start of ITER construction, and asked the IT Leader to report on an estimate and time profile of expenditure during the period to mid-2004. The Committee supported the proposals to re-establish the ITER Test Blanket Working. The Committee agreed that the phasing of planned

  12. Improving the training process of skilled bodybuilders in specially-preparatory phase of the preparatory period

    Directory of Open Access Journals (Sweden)

    Viktor Dzhym

    2014-12-01

    Full Text Available Purpose: to study methods of improving the training process of skilled bodybuilders in a specially-preparatory phase of the preparatory period. Materials and Methods: the study involved 18 skilled bodybuilders are included in the team of the Kharkiv region of bodybuilding. Results: a comparative characteristic of the most commonly used methods of training process in bodybuilding. Developed and justified the optimal technique for skilled bodybuilders, depending on the initial form of the athlete at the beginning of a specially-preparatory phase of training. Shows the dependence of changes in body weight bodybuilder from the training process. Conclusions: on the basis of the research the author proposes an optimal method of training depending on the training microcycle in the run specially-preparatory stage.

  13. European Strategy Preparatory Group - CALL FOR SUBMISSIONS

    CERN Multimedia

    2012-01-01

    As part of the Update of the European Strategy for Particle Physics, the European Strategy Preparatory Group (ESPG) welcomes submissions on issues related to the strategy from individual physicists, from groups of scientists representing a community (an experiment, a topic of theoretical research, etc.) as well as from Institutions and Organizations (funding agencies, ministries, etc).   These contributions will be discussed at the meetings of the Preparatory Group and during the Open Symposium to be held on 10-12 September 2012 in Cracow, and will be made available to the Strategy Group for drafting the Update of the Strategy. How to submit a contribution? Send your contribution on the scientific issues below using the form under http://indico.cern.ch/event/espg_input (preferably as an attached PDF file): - Accelerator Physics - Astroparticle Physics, Gravitation and Cosmology - Flavour Physics and Symmetries - Physics at High Energy Frontier - Physics of Neutrinos - Strong Interaction Physics...

  14. Improving the training process of highly skilled bodybuilders in the preparatory period, general preparatory phase

    Directory of Open Access Journals (Sweden)

    Olexandr Tyhorskyy

    2015-10-01

    Full Text Available Purpose: to improve the method of training highly skilled bodybuilders. Material and Methods: the study involved eight highly skilled athletes, members of the team of Ukraine on bodybuilding. Results: comparative characteristics of the most commonly used methods of training process in bodybuilding. Developed and substantiated the optimal method of training highly skilled bodybuilders during the general preparatory phase of the preparatory period, which can increase body weight through muscle athletes component. Conclusions: dynamic load factor to raise the intensity of training loads allows orientation help to increase volumes shoulder muscles

  15. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  16. Effects of a Preparatory Singing Pattern on Melodic Dictation Success

    Science.gov (United States)

    Buonviri, Nathan O.

    2015-01-01

    The purpose of this study was to investigate effects of a preparatory contextual singing pattern on melodic dictation test scores. Forty-nine undergraduate music education majors took melodic dictations under three conditions. After hearing an orienting chord sequence, they (1) sang a preparatory solfége pattern in the key, meter, and tempo of the…

  17. Vanguard Preparatory School Observations of the Double Star STF 1692

    Science.gov (United States)

    Anderson, Serenity; Buccola, Breck; Garcia, Karen; Gosney, Matthew; Housatchenko, Jonathan; Martinez, Lilian; Myskow, Wyatt; Renteria, Noah; Schlosser, Ruth; Thompson, Leone; Estrada, Reed; Estrada, Chris

    2016-01-01

    Using a 22-inch Newtonian Alt/Az telescope and a Celestron Micro Guide eyepiece, students from Vanguard Preparatory observed the binary star Cor Caroli (STF 1692) and found a position angle of 228 degrees as well as an average separation of 21.10". This project was a part of the Vanguard Preparatory Double Star Workshop 2015 in Apple Valley, California.

  18. Goal oriented Mathematics Survey at Preparatory Level- Revised set ...

    African Journals Online (AJOL)

    This cross sectional study design on mathematical syllabi at preparatory levels of the high schools was to investigate the efficiency of the subject at preparatory level education serving as a basis for several streams, like Natural science, Technology, Computer Science, Health Science and Agriculture found at tertiary levels.

  19. Shadow Capital: The Democratization of College Preparatory Education

    Science.gov (United States)

    Cipollone, Kristin; Stich, Amy E.

    2017-01-01

    In this article, we examine the manifestation and consequences of shadow capital within two public, urban, nonselective, college preparatory-designated high schools serving exclusively nondominant students. Informed by three years of ethnographic data, we argue that the transference of a historically elite college preparatory education from…

  20. Reflecting on Language from ‘Sideways-on’: Preparatory and Non-Preparatory Aspects-Seeing

    Directory of Open Access Journals (Sweden)

    Reshef Agam-Segal

    2012-09-01

    Full Text Available Aspect-seeing, I claim, involves reflection on concepts. It involves letting oneself feel how it would be like to conceptualize something with a certain concept, without committing oneself to this conceptualization. I distinguish between two kinds of aspect-perception: 1. Preparatory: allows us to develop, criticize, and shape concepts. It involves bringing a concept to an object for the purpose of examining what would be the best way to conceptualize it. 2. Non-Preparatory: allows us to express the ingraspability of certain experiences. It involves bringing a concept to an object for the purpose of showing—per impossible—what it would take to properly capture one’s experience. I demonstrate the usefulness of the two kinds of aspect perception in making conceptual judgments, and in making moral and aesthetic judgments.

  1. [Third preparatory committee for the International Conference on Population and Development. Peru presentation].

    Science.gov (United States)

    Lopez, C

    1994-01-01

    This address by the Peruvian delegation to the Third Preparatory Committee Meeting for the International Conference on Population and Development focuses on four points in the proposed Plan of Action that might require further development. First, the link between drug trafficking and environmental degradation should be recognized. Cultivation of narcotic plants contributes to deforestation of the tropical forest and contamination of rivers, and along with terrorism has caused considerable population movement in Peru. The second point is that widespread poverty, limited investment in human capital, insufficient institutional capacity, and the external debt burden of the developing countries are clearly interrelated with sociodemographic processes and decisively affect the capacity of the nation to implement population policies and programs as a function of current and future international commitments. The third point is that, in the area of information, education, and communication, attention should be given to the entire life cycle and the entirety of themes related to population. Finally, coordinated programs between public and private institutions and nongovernmental organizations at the national level, and between the U.N. Population Fund, the Population Commission, and the Commission on Sustainable Development at the international level, should be organized to assure effective follow-up on Plan of Action proposals and agreements. Peru has participated in a wide variety of international conferences and activities related to population, and was a major participant in the subregional preparatory conference of the Andean nations.

  2. LS1 Report: Preparatory phase complete

    CERN Multimedia

    Katy Foraz

    2013-01-01

    The preparatory phase in the LHC which includes electrical and leak test is now completed. The field is now free for consolidation, upgrade and maintenance activities.   Three magnets have been replaced in sector 7-8 and a special intervention team is now connecting new magnets that have been installed. Two magnets of sector 1-2 will be exchanged this week. The R2E project is progressing well: the power converters are being removed at points 1 and 7, while the protection works required prior to any civil engineering works commencing are almost finished at point 5. Moreover, many other activities are taking place in LHC, including the consolidation of the cryo line, and the maintenance of radio-frequency systems and cabling. The activities in the injector complex are also in full gear. Sixteen magnets at the SPS are being exchanged, and the pick-up tank of AD is now back in place. Meanwhile, the PS cranes are being exchanged and the old PS ventilation system is being replaced. The interconnecti...

  3. The world at a critical turning point. Edited transcripts of the forums held in the United Nations on 8-9 April, 14 April, 22 October and 27-29 October 1998 and 15 and 22 April 1999 by the NGO Committee on Disarmament, in cooperation with the UN Department for Disarmament Affairs and the UN Department of Public Information, and the 11 May 1999 presentations by NGOs to the third PrepCom for the Non-Proliferation Treaty Review Conference in 2000

    International Nuclear Information System (INIS)

    1999-01-01

    This publication includes the edited transcripts of the panel discussions held in the United Nations by the NGO Committee on Disarmament in 1998 and early 1999 and the presentations made by NGOs on May 11, 1999 at the third Prep Com for the Non-Proliferation Treaty Review Conference to be held in the year 2000. NGOs need to be much more active, on a much larger scale, to play an effective role at the UN and with their own governments. The NGO Committee on Disarmament welcomes the membership of all individuals and organizations that have an interest in the activities of the UN in the disarmament, international security and peacekeeping areas. Agreement on the agenda and timing of a fourth Special Session on Disarmament (SSOD IV) was not reached by the working group that met for the fourth year during the Disarmament Commission in April, 1999. The Disarmament Commission operates under rules of consensus, and the objection of India prevented a resolution of this issue. It could be resolved by the First Committee, with a vote. The stumbling block has been the differing views of delegations on the importance of the Final Document of the First Special Session on Disarmament. NGO experts could make a very worthwhile contribution to the discussion on nuclear weapons and on conventional disarmament, UN peacekeeping, peacemaking, and peace enforcing that might Increase the chances of a worthwhile SSOD IV. We welcome your suggestions. The major focus of the First Committee discussion in November, 1998 was on the resolution put forth by Ireland, Sweden, Brazil, Egypt, Mexico, New Zealand and South Africa. That called for a new agenda. Much of the discussion that asked 'How Can We Make Greater Progress Towards Nuclear Disarmament and Prevent Further Proliferation?' focuses on the New Agenda Coalition resolution. Resolution 53/77Y was adopted without the support of the US, UK, France, the Russian Federation, India, Pakistan or Israel (China abstained.) Nevertheless, 114

  4. Study of Educational Aspirations of Preparatory School Students in Yemen.

    Science.gov (United States)

    Edington, Everett D.

    To identify causes for low enrollment in secondary agricultural schools in Yemen, the United States Agency for International Development and the Yemen Ministry of Education surveyed 990 preparatory (junior high) students, examining their educational aspirations, differences between rural and urban youth, major influences on student aspirations,…

  5. Preparatory neural activity predicts performance on a conflict task.

    Science.gov (United States)

    Stern, Emily R; Wager, Tor D; Egner, Tobias; Hirsch, Joy; Mangels, Jennifer A

    2007-10-24

    Advance preparation has been shown to improve the efficiency of conflict resolution. Yet, with little empirical work directly linking preparatory neural activity to the performance benefits of advance cueing, it is not clear whether this relationship results from preparatory activation of task-specific networks, or from activity associated with general alerting processes. Here, fMRI data were acquired during a spatial Stroop task in which advance cues either informed subjects of the upcoming relevant feature of conflict stimuli (spatial or semantic) or were neutral. Informative cues decreased reaction time (RT) relative to neutral cues, and cues indicating that spatial information would be task-relevant elicited greater activity than neutral cues in multiple areas, including right anterior prefrontal and bilateral parietal cortex. Additionally, preparatory activation in bilateral parietal cortex and right dorsolateral prefrontal cortex predicted faster RT when subjects responded to spatial location. No regions were found to be specific to semantic cues at conventional thresholds, and lowering the threshold further revealed little overlap between activity associated with spatial and semantic cueing effects, thereby demonstrating a single dissociation between activations related to preparing a spatial versus semantic task-set. This relationship between preparatory activation of spatial processing networks and efficient conflict resolution suggests that advance information can benefit performance by leading to domain-specific biasing of task-relevant information.

  6. GAUDI: A Preparatory Archive for the COROT Mission

    NARCIS (Netherlands)

    Solano, E.; Aerts, C.C.

    2005-01-01

    The GAUDI database (Ground-based Asteroseismology Uniform Database Interface) is a preparatory archive for the COROT (Convection, Rotation, and Planetary Transits) mission developed at the Laboratorio de Astrofísica Espacial y Física Fundamental (Laboratory for Space Astrophysics and Theoretical

  7. Preparatory Training, States of Goal Orientation, and Mentoring Relationship Effectiveness

    Science.gov (United States)

    Scielzo, Shannon; Neeper, Michael; Smith-Jentsch, Kimberly A.

    2012-01-01

    We used an online academic-advising program to examine the effects of preparatory training designed to elicit high states of learning-goal orientation and low states of avoid goal orientation. Results indicate that training was effective in some cases for manipulating states of goal orientation. The training did not directly affect behaviors as…

  8. Commissioning MMS

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  9. Preparatory activities of the Fugen decommissioning

    International Nuclear Information System (INIS)

    Iguchi, Y.; Tajiri, T.; Kiyota, S.

    2004-01-01

    The Advanced Thermal Reactor Fugen is a 165 MWe, heavy water moderated, light-water cooled, pressure-tube type reactor. In February 1998, the Atomic Energy Commission of Japan introduced a new policy that development and research of decommissioning of Fugen should be promoted in order to carry out the decommissioning smoothly after the shutdown. The Fugen reactor was shut down definitely in March 2003, and Fugen has been preparing for the project, including necessary development of technologies. The development of decommissioning for Fugen is divided into two areas. One area is the development of unique technology for dismantling special components such as the reactor core and the heavy water system. Another area is the improvement and enhancement of existing technologies. Especially the former area requires effort and comprises development of the reactor dismantlement, tritium decontamination of heavy water system and engineering support systems. The activities are as follows: the density and amount of radioactive nuclides in all equipment or concrete including the reactor core need to be evaluated for the decommissioning. To prepare for decommissioning, analysis, measurement and evaluation of the neutron flux density have been executed during reactor operation. Special dismantling process is necessary for the heavy water system and the reactor that are unique to Fugen. Some studies and tests are going on for the safe dismantling based on existing technologies and their combination. Systems engineering approach is necessary in order to optimize the work load, exposure dose, waste mass and cost by selecting appropriate dismantling process at the planning stage of the decommissioning. For this reason, in order to make a decommissioning plan efficiently, we have been developing an Engineering Support System for decommissioning by adopting new information technologies such as three-dimensional computer-aided design system and virtual reality system. Moreover, the

  10. Commission 1

    African Journals Online (AJOL)

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  11. Joint Commission

    Science.gov (United States)

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  12. Introduction of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) and preparatory activities for its entry into force

    Energy Technology Data Exchange (ETDEWEB)

    Tani, Hiroshi [Japan Atomic Energy Research Inst., Mutsu Establishment, Mutsu, Aomori (Japan)

    2001-03-01

    The Comprehensive Nuclear-Test-Ban Treaty (CTBT) is a very important treaty, not only for Japan but also for the world, because it prohibits any nuclear weapon test explosion or any other nuclear explosion anywhere in the world. The treaty however will not enter into force until it has been signed and ratified by all the 44 states listed in Annex 2 to the treaty. Many efforts to facilitate the treaty's early entry into force are being done by many countries and many international organizations. As one of result of these efforts, a Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization had be established at a meeting of State Signatories on 19 November 1996, and the Commission started activities to establish global verification regime of the treaty and to prepare for its entry into force. Under the CTBT activities, the Japan Atomic Energy Research Institute (JAERI) is expected to play an important role as supporter for the Japanese Government, especially in a field of an International Monitoring System (IMS). However, there is no appropriate guide book on the CTBT for JAERI staff at present. This report provides some introduction of the CTBT regime and preparatory activities for its entry into force. Only open source information is used for making the report. If anyone need more detail information, it should be asked to contact competent authorities. (author)

  13. Improvement of the training process of qualified female athletes engaged in bodybuilding in the general preparatory stage of the preparatory period, taking into account the biological cycle

    Directory of Open Access Journals (Sweden)

    Viacheslav Mulyk

    2017-06-01

    Full Text Available Purpose: substantiation of the methodology of the training process of qualified female athletes engaged in bodybuilding in the general preparatory stage of the preparatory period, taking into account the biological cycle. Material & Methods: in the study participated 18 qualified female athletes engaged in bodybuilding, included in the Kharkov region team of bodybuilding. Results: comparative characteristic of the most frequently used methodology of the training process in bodybuilding are shows. An optimal methodology for qualified female athletes engaged in bodybuilding has been developed and justified, depending on the initial form of the athlete at the beginning of the general preparatory stage of the training. The dependence of the change in the body weight of female athletes from the training process is shows. Conclusion: on the basis of the study, the author suggests an optimal training methodology depending on the mesocycle of training in the preparatory period in the general preparatory stage.

  14. Uncertainty during pain anticipation: the adaptive value of preparatory processes.

    Science.gov (United States)

    Seidel, Eva-Maria; Pfabigan, Daniela M; Hahn, Andreas; Sladky, Ronald; Grahl, Arvina; Paul, Katharina; Kraus, Christoph; Küblböck, Martin; Kranz, Georg S; Hummer, Allan; Lanzenberger, Rupert; Windischberger, Christian; Lamm, Claus

    2015-02-01

    Anticipatory processes prepare the organism for upcoming experiences. The aim of this study was to investigate neural responses related to anticipation and processing of painful stimuli occurring with different levels of uncertainty. Twenty-five participants (13 females) took part in an electroencephalography and functional magnetic resonance imaging (fMRI) experiment at separate times. A visual cue announced the occurrence of an electrical painful or nonpainful stimulus, delivered with certainty or uncertainty (50% chance), at some point during the following 15 s. During the first 2 s of the anticipation phase, a strong effect of uncertainty was reflected in a pronounced frontal stimulus-preceding negativity (SPN) and increased fMRI activation in higher visual processing areas. In the last 2 s before stimulus delivery, we observed stimulus-specific preparatory processes indicated by a centroparietal SPN and posterior insula activation that was most pronounced for the certain pain condition. Uncertain anticipation was associated with attentional control processes. During stimulation, the results revealed that unexpected painful stimuli produced the strongest activation in the affective pain processing network and a more pronounced offset-P2. Our results reflect that during early anticipation uncertainty is strongly associated with affective mechanisms and seems to be a more salient event compared to certain anticipation. During the last 2 s before stimulation, attentional control mechanisms are initiated related to the increased salience of uncertainty. Furthermore, stimulus-specific preparatory mechanisms during certain anticipation also shaped the response to stimulation, underlining the adaptive value of stimulus-targeted preparatory activity which is less likely when facing an uncertain event. © 2014 Wiley Periodicals, Inc.

  15. THE STAFF ASSOCIATION'S INTERNAL COMMISSIONS A source of innovative ideas

    CERN Multimedia

    STAFF ASSOCIATION

    2010-01-01

    In the heart of the Staff Association, internal commissions carry out preparatory work which is indispensable for productive discussions in Staff Council and Executive Committee meetings. These working groups, composed of staff delegates and interested staff members, are think tanks for all subjects in the area assigned to them. Five commissions are active in 2010 : The “In-Form-Action” Commission develops a communication strategy (Information), organizes staff mobilization and action (Action) and promotes delegate training (Formation [training]), in order to enhance, support and professionalize the activities of the Staff Association. The Commission for “Employment Conditions” deals with remuneration, the advancement system, working hours, recruitment, and retention, among other things. It gives its opinion on proposals by the Management or elaborates its own proposals. The Commission for “Health and Safety” examines all aspec...

  16. Preparatory power posing affects nonverbal presence and job interview performance.

    Science.gov (United States)

    Cuddy, Amy J C; Wilmuth, Caroline A; Yap, Andy J; Carney, Dana R

    2015-07-01

    The authors tested whether engaging in expansive (vs. contractive) "power poses" before a stressful job interview--preparatory power posing--would enhance performance during the interview. Participants adopted high-power (i.e., expansive, open) poses or low-power (i.e., contractive, closed) poses, and then prepared and delivered a speech to 2 evaluators as part of a mock job interview. All interview speeches were videotaped and coded for overall performance and hireability and for 2 potential mediators: verbal content (e.g., structure, content) and nonverbal presence (e.g., captivating, enthusiastic). As predicted, those who prepared for the job interview with high- (vs. low-) power poses performed better and were more likely to be chosen for hire; this relation was mediated by nonverbal presence, but not by verbal content. Although previous research has focused on how a nonverbal behavior that is enacted during interactions and observed by perceivers affects how those perceivers evaluate and respond to the actor, this experiment focused on how a nonverbal behavior that is enacted before the interaction and unobserved by perceivers affects the actor's performance, which, in turn, affects how perceivers evaluate and respond to the actor. This experiment reveals a theoretically novel and practically informative result that demonstrates the causal relation between preparatory nonverbal behavior and subsequent performance and outcomes. (c) 2015 APA, all rights reserved).

  17. 1995 World Conference on Women. African Regional Preparatory Conference, November 94, Dakar.

    Science.gov (United States)

    1995-04-01

    During the African Regional Preparatory Conference, held in Dakar in November 1994, the Inter-African Committee on Traditional Practices Affecting the Health of Women and Children (IAC) organized a workshop on "Traditional Practices and Beliefs as a Violation of the Human Rights of the Woman and the Girl Child" in collaboration with the Organisation of African Unity (OAU) and the UN Economic Commission for Africa (ECA). Eight panelists shared their country experiences and made proposals for eradicating harmful traditional practices. A film was shown, and Mrs. Marianne Sidibe, president of the Senegalese IAC National Committee, gave a vivid description of female genital mutilation (FGM). Proposals made during the workshop include 1) a follow-up workshop in Beijing; 2) inclusion of IAC concerns in the Platform of Action; 3) integration of IAC concerns into the national health programs of African nations with allocated budgets for implementation; 4) strengthening of interagency collaboration with governments; 5) adoption of legislation prohibiting harmful traditional practices such as FGM; 6) a minimum legal age for marriage of 18 years; 7) inclusion of information on traditional practices and gender sensitivity in primary and high school curricula; 8) involvement of youth in the campaign against harmful traditional practices; 9) regular evaluation of IAC activities; and 10) education of parents concerning gender equality. The African Platform for Action adopted by the conference considers FGM a form of violence against women.

  18. Preparatory Behavior for Condom Use among Heterosexual Young Men: A Longitudinal Mediation Model

    Science.gov (United States)

    Carvalho, Telma; Alvarez, Maria-João; Barz, Milena; Schwarzer, Ralf

    2015-01-01

    Objective: Motivation is not sufficient to actually use condoms, as self-regulatory processes are needed to translate motivation into action. Buying condoms and carrying them constitute preparatory behaviors that may serve as proximal predictors of action. Whether or not such preparatory behaviors operate as mediators between intention and action…

  19. Gum chewing improves adolescents’ math performance in an SAT preparatory course

    Science.gov (United States)

    The purpose of the current study was to determine the effect of gum chewing on students’ performance in a preparatory course for the Scholastic Aptitude Test (SAT). A total of 182 adolescents enrolled in an SAT preparatory class were randomized into one of two treatments: 1) gum chewing condition (G...

  20. A Study of Student Retention and Attitudes in a Community College Preparatory Mathematics Course.

    Science.gov (United States)

    Rhodes, Jolene M.

    This study explored the effects of the use of laboratory activities on students' attitudes and retention in a community college preparatory mathematics course. It also examined whether the use of numerical, analytical, and graphical methods of solution in preparatory classes would affect student retention in the succeeding algebra course. The…

  1. The influence of the premedication consult and preparatory information about anesthesia on anxiety among patients undergoing cardiac surgery

    NARCIS (Netherlands)

    Van der Zee, K.I.; Gallandat Huet, R.CG; Cazemier, C; Evers, K

    The present study examines the impact of patients' subjective evaluation of the premedication consult and of preparatory information about anesthesia on preoperative anxiety among patients undergoing cardiac surgery (N=93). The preparatory information concerned a flyer that contained information

  2. The influence of the premedication consult and preparatory information about anesthesia on anxiety among patients undergoing cardiac surgery

    NARCIS (Netherlands)

    Van der Zee, K. I.; Huet, R. C.Gallandat; Cazemier, C.; Evers, K.

    The present study examines the impact of patients' subjective evaluation of the premedication consult and of preparatory information about anesthesia on preoperative anxiety among patients undergoing cardiac surgery (N = 93). The preparatory information concerned a flyer that contained information

  3. GAUDI: A Preparatory Archive for the COROT Mission

    Science.gov (United States)

    Solano, E.; Catala, C.; Garrido, R.; Poretti, E.; Janot-Pacheco, E.; Gutiérrez, R.; González, R.; Mantegazza, L.; Neiner, C.; Fremat, Y.; Charpinet, S.; Weiss, W.; Amado, P. J.; Rainer, M.; Tsymbal, V.; Lyashko, D.; Ballereau, D.; Bouret, J. C.; Hua, T.; Katz, D.; Lignières, F.; Lüftinger, T.; Mittermayer, P.; Nesvacil, N.; Soubiran, C.; van't Veer-Menneret, C.; Goupil, M. J.; Costa, V.; Rolland, A.; Antonello, E.; Bossi, M.; Buzzoni, A.; Rodrigo, C.; Aerts, C.; Butler, C. J.; Guenther, E.; Hatzes, A.

    2005-01-01

    The GAUDI database (Ground-based Asteroseismology Uniform Database Interface) is a preparatory archive for the COROT (Convection, Rotation, and Planetary Transits) mission developed at the Laboratorio de Astrofísica Espacial y Física Fundamental (Laboratory for Space Astrophysics and Theoretical Physics, Spain). Its intention is to make the ground-based observations obtained in preparation of the asteroseismology program available in a simple and efficient way. It contains spectroscopic and photometric data together with inferred physical parameters for more than 1500 objects gathered since 1998 January 1998 in 6 years of observational campaigns. In this paper, the main functions and characteristics of the system are described. Based on observations collected at La Silla (ESO proposals 67.D-0169, 69.D-0166, and 70.D-0110), Telescopio Nazionale Galileo (proposal 6-20-068), Observatoire de Haute-Provence, the South African Astronomical Observatory, Tautenburg Observatory, and Sierra Nevada Observatory.

  4. CTBT PrepCom work in Namibia

    International Nuclear Information System (INIS)

    Hutchins, D.

    2002-01-01

    The history, location and facilities of Namibia's Tsumeb Geophysical Research Station are briefly described. The station's seismic and infrasound activities together with its IMS and CTBTO membership are mentioned. Manpower, training and budgetary constriants are noted

  5. How to opt into the Common European Sales Law? Brief comments on the Commission's proposal for a regulation

    NARCIS (Netherlands)

    Hesselink, M.

    2012-01-01

    Unlike the actual text for the proposed Common European Sales Law (CESL), which is based on extensive preparatory work by academics, the regime for opting into the instrument, which is set out in the main text of the proposed regulation, is entirely of the European Commission's own making. The

  6. How to opt into the Common European Sales Law? Brief comments on the Commission's proposal for a regulation

    NARCIS (Netherlands)

    Hesselink, M.W.; Claeys, I.; Feltkamp, R.

    2013-01-01

    Unlike the actual text for the proposed Common European Sales Law (CESL), which is based on extensive preparatory work by academics, the regime for opting into the instrument, which is set out in the main text of the proposed regulation, is entirely of the European Commission's own making. The

  7. The NPOESS Preparatory Project Science Data Segment: Brief Overview

    Science.gov (United States)

    Schweiss, Robert J.; Ho, Evelyn; Ullman, Richard; Samadi, Shahin

    2006-01-01

    The NPOESS Preparatory Project (NPP) provides remotely-sensed land, ocean, atmospheric, ozone, and sounder data that will serve the meteorological and global climate change scientific communities while also providing risk reduction for the National Polar-orbiting Operational Environmental Satellite System (NPOESS), the U.S. Government s future low-Earth orbiting satellite system monitoring global weather and environmental conditions. NPOESS and NPP are a new era, not only because the sensors will provide unprecedented quality and volume of data but also because it is a joint mission of three federal agencies, NASA, NOAA, and DoD. NASA's primary science role in NPP is to independently assess the quality of the NPP science and environmental data records. Such assessment is critical for making NPOESS products the best that they can be for operational use and ultimately for climate studies. The Science Data Segment (SDS) supports science assessment by assuring the timely provision of NPP data to NASA s science teams organized by climate measurement themes. The SDS breaks down into nine major elements, an input element that receives data from the operational agencies and acts as a buffer, a calibration analysis element, five elements devoted to measurement based quality assessment, an element used to test algorithmic improvements, and an element that provides overall science direction. This paper will describe how the NPP SDS will leverage on NASA experience to provide a mission-reliable research capability for science assessment of NPP derived measurements.

  8. A study of depression among Alexandria preparatory school adolescents.

    Science.gov (United States)

    Abou Nazel, M W; Fahmy, S I; Younis, I A; Seif el-Din, A G; Abdel Fatah, M; Mokhtar, S; Ayoub, A I

    1991-01-01

    Using a constructed Arabic version of Children Depression Inventory (CDI), screening of a stratified random sample of 1% (1561) of Alexandria Preparatory school adolescents was carried out. The prevalence of depressive scorers was 10.25% of total sample. A sub-sample of depressed scorers (111 pupils) were compared with controls (non-depressed scorers) matched on age and sex to study a variety of personal, familial, medical and scholastic ecological variables. Pupils neuroticism scorers were most predictive of depressive scorers where they explained 59.79% of the variance. Other ecological factors including peer and sibling relationships, introversive and lie scale scorers and scholastic performance explained an additional 14.87% of the variance. Using Beck Depression Inventory (BDI) and Mother-Father relationship check list, a sub-sample of depressed pupils' mothers were compared with controls of non-depressed pupils' mothers (42 mothers for each). Results indicated a strong positive correlation between pupils, CDI scores and their mothers BDI scores. On the other hand poor mother-father relationship was significantly associated with depressive scores of pupils. Findings, pointed to the need for reconsideration of school mental health program, since the presented medical and social services to depressed pupils were very poor.

  9. On the problem of technological innovations in driving preparatory workings in thin coal seams

    Energy Technology Data Exchange (ETDEWEB)

    Peknik, J

    1980-03-01

    Possibilities of mechanizing preparation of thin coal seams for longwall mining are discussed. Until now preparatory workings in the Ostrava Karvina coal region have been driven mainly by manual work or blasting. Tables show the total length of preparatory workings driven in the period 1973-1978 and the average advance of preparatory working per day and per shift. Factors influencing mechanization of preparatory working drivage are: geological disturbances, angle of seam inclination and its changes, thickness of the seam and strength of coal. Some types of mining machines which can be used for driving preparatory workings in thin, horizontal and inclined coal seams and produced in the USSR and United Kingdom are reviewed. Two sets of machines used in coal seams inclined up to 18 or 20 degrees are presented: KN produced in the USSR and 'In seam Miner' produced by the Dosco firm in the UK. Parameters of both machines are compared. The following Soviet machines for driving preparatory workings in inclined seams are also reviewed: 2 KNP (slope 45-80 degrees), KMD-72 (slope 45-80 degrees, height of the seam 0.6 m to 1.2 m), MRS-2 (slope 45-90 degrees, height of the seam 0.55 m to 1.0 m). (7 refs.) (In Czech)

  10. Dissecting patterns of preparatory activity in the frontal eye fields during pursuit target selection.

    Science.gov (United States)

    Raghavan, Ramanujan T; Joshua, Mati

    2017-10-01

    We investigated the composition of preparatory activity of frontal eye field (FEF) neurons in monkeys performing a pursuit target selection task. In response to the orthogonal motion of a large and a small reward target, monkeys initiated pursuit biased toward the direction of large reward target motion. FEF neurons exhibited robust preparatory activity preceding movement initiation in this task. Preparatory activity consisted of two components, ramping activity that was constant across target selection conditions, and a flat offset in firing rates that signaled the target selection condition. Ramping activity accounted for 50% of the variance in the preparatory activity and was linked most strongly, on a trial-by-trial basis, to pursuit eye movement latency rather than to its direction or gain. The offset in firing rates that discriminated target selection conditions accounted for 25% of the variance in the preparatory activity and was commensurate with a winner-take-all representation, signaling the direction of large reward target motion rather than a representation that matched the parameters of the upcoming movement. These offer new insights into the role that the frontal eye fields play in target selection and pursuit control. They show that preparatory activity in the FEF signals more strongly when to move rather than where or how to move and suggest that structures outside the FEF augment its contributions to the target selection process. NEW & NOTEWORTHY We used the smooth eye movement pursuit system to link between patterns of preparatory activity in the frontal eye fields and movement during a target selection task. The dominant pattern was a ramping signal that did not discriminate between selection conditions and was linked, on trial-by-trial basis, to movement latency. A weaker pattern was composed of a constant signal that discriminated between selection conditions but was only weakly linked to the movement parameters. Copyright © 2017 the American

  11. Changes in the physical capacity of road cyclists during the preparatory period

    Directory of Open Access Journals (Sweden)

    Krzysztof Byzdra

    2017-07-01

    Full Text Available Graduation work entitled "Changes in the physical capacity of road cyclists during the preparatory period" is based on spiroergometric tests, which assess at the same time three systems: respiratory, circulatory and muscular.                The work shows the changes effort possibilities of road cyclists, under the influence of training conducted during the preparatory period.                In the theoretical part of this work were characterized the concept of physical capacity, its division and assessment methods of capacity. Selected parameters were presented, determined in the spiroergometric tests. Also the time structure of training in road cycling was described.                Each of competitors were tested twice a time. The first test took place at the turn of January and December, that is during the preparatory period. The second test cyclists took place in the second half of March, so at the end of the preparatory period,  before the first races. The results of five parameters were analyzed: WR max, WR (VT1, VO2max, VO2 / HR (VT1,% VO2max (VT1.                All tested parameters were increased during preparatory period. The most susceptible to the increase parameters under the influence of training during the preparatory period are: power generated on the anaerobic threshold and on the top of the effort (increase 12,68% and 11,25%, oxygen pulse (12,88%. Training improve the work of the muscular and circulatory systems. The least exposed to changes are parameters of gas exchange.                Spiroergometric tests results can be used for planning training in subsequent training periods.

  12. Report on the Audit of the U.S. Air Force Preparatory School

    Science.gov (United States)

    1995-01-18

    OFFICE OF THE INSPECTOR GENERAL Report REPORT ON THE AUDIT OF THE U.S. PREPARATORY SCHOOL No. 95-077 AIR FORCE January 18, 1995 :W:^>»*»!l...SUBJECT: Report on the Audit of the U.S. Air Force Preparatory School (Report No. 95-077) This final report is provided for your information and use. It...comments are required. The courtesies extended to the audit staff are appreciated. If you have questions on this audit, please contact Mr. Harlan M

  13. Statement from the 1987 Como meeting of the international commission on radiological protection

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    The Commission is presently revising its basic recommendations which were presented in ICRP Publication 26 in 1977 and in a number of subsequent statements and amendments as well as in other ICRP reports. The revised recommendations are expected to be completed by 1990 after preparatory work by the Commission's four expert committees and a number of ad hoc task groups. This work included a review and re-assessment of the complete system of dose limitation, including the values of the dose limits. In this article certain dose limit problems are discussed

  14. Selected factors associated with achievement of biology preparatory students and their follow-up to higher level biology courses

    Science.gov (United States)

    Biermann, Carol A.; Sarinsky, Gary B.

    This study was undertaken to determine whether a biology preparatory course given at an urban community college was helping students to develop the proper skills and background necessary for them to successfully complete follow-up courses in biology. A group of students who enrolled in a biology preparatory course, and subsequently, a follow-up anatomy and physiology or general biology course (experimental group) was compared to a group of students who should have registered for the preparatory course, but who enrolled directly into the anatomy and physiology or general biology course (control group). It was shown that there was no significant difference in their anatomy and physiology or general biology grades. Furthermore, only 16% of the initial group of preparatory students enrolled in and passed a follow-up biology course. Examination of the preparatory group using discriminant analysis ascertained that mathematics score was the principle discriminator between pass/fail groups. A stepwise multiple regression analysis of the variables explaining the preparatory grade showed that mathematics score, reading score, and type of high school degree explained 33% of the variance. Of the students who did pass the preparatory course and enrolled in a follow-up biology class, their preparatory grade was a good predictor of their achievement (measured by follow-up course grade), as determined by multiple regression.

  15. Procedure of the preparatory works execution during the remediation of high-rise buildings debris due to the disaster

    Science.gov (United States)

    Sinitsyn, Denis

    2018-03-01

    The article covers one of the preparatory works types, in particular - the debris clearance. The types of machines and machinery, the purposes of the debris clearance, as well as the tasks for decrease of debris mass and scope are specified herein. The purpose of the article is to show the current level of the domestic machinery, as well as to share the experience of preparatory works. The article describes one of the preparatory works types, in particular - the debris clearance during the high-rise buildings demolition. Given are the equipment and machinery types, covered are the purposes and procedure of debris clearance defined are the tasks on reduction of debris mass and sizes. Specified are the types and methods of the preparatory works execution. The purpose of this article is to demonstrate the domestic equipment current state, and to share the experience in preparatory works execution.

  16. Graphic Communications--Preparatory Area. Book I--Typography and Modern Typesetting. Teacher's Manual.

    Science.gov (United States)

    Hertz, Andrew

    Intended for use with a companion student manual, this teacher's guide lists procedures and teaching tips for each unit of a secondary or postsecondary course of study in typography and modern typesetting. Course objectives are listed for developing student skills in the following preparatory functions of the graphic communications industry: copy…

  17. Saudi EFL Preparatory Year Students' Perception about Corrective Feedback in Oral Communication

    Science.gov (United States)

    Alhaysony, Maha

    2016-01-01

    This study sought to investigate the attitudes of Saudi EFL students towards corrective feedback (henceforth CF) on classroom oral errors. The subjects were 3200 (1223 male and 1977 female) students enrolled in an intensive English language programme in the preparatory year at the University of Ha'il. A questionnaire was the main instrument. This…

  18. Factors Affecting the Quality of English Language Teaching in Preparatory Year, University of Jeddah

    Science.gov (United States)

    Dakhiel, Maysoon A.

    2017-01-01

    Several Universities in Saudi Arabia have recently made it their priority to pursue excellence in effective EFL teaching-learning starting from the Preparatory Year Program (PYP). That is due to the rapid expansion of English as a lingua franca in tertiary education especially in science and technology, scientific and educational publication,…

  19. THE PROBLEM OF HOT-SPOTS IN MICROWAVE EQUIPMENT USED FOR PREPARATORY TECHNIQUES - THEORY AND PRACTICE

    NARCIS (Netherlands)

    KOK, LP; BOON, ME; SMID, HM

    1993-01-01

    Electron microscopists who wants to use a microwave (MW) oven to stimulate preparatory processes are sooner or later confronted with the problem of hot spots. It soon becomes clear to the user of any MW oven that the energy distribution-thus the speed of absorbing energy, and hence warming up-varies

  20. The Effect of Preparatory Set on Musical Response in College Students.

    Science.gov (United States)

    Bartel, Lee R.

    1992-01-01

    Presents study results on the cognitive-affective response to music as affected by three dimensions of preparatory set. Explores self-perception of musicality, attitude toward style concepts and valuing of music experiences, and beliefs and expectations of music listening. Concludes that perception of musicality, general attitude, style…

  1. Parents' Positive Role in Students' Learning Process at Ishik University Preparatory School

    Science.gov (United States)

    Tosun, Mustafa

    2015-01-01

    The reason that motivated me to initiate this writing is to emphasize the deficiency in the motivation and unwillingness of university youth cause of the parents approach toward the education at preparatory school. Moreover, my aim is to declare realistic suggestions about the issue with the help of observations that have been gained during the…

  2. Graphic Communications--Preparatory Area. Book I--Typography and Modern Typesetting. Student Manual.

    Science.gov (United States)

    Hertz, Andrew

    Designed to develop in the student skills in all of the preparatory functions of the graphic communications industry, this student guide covers copy preparation, art preparation, typography, camera, stripping, production management, and forms design, preparation, and analysis. In addition to the skills areas, material is included on the history of…

  3. Article Errors in the English Writing of Saudi EFL Preparatory Year Students

    Science.gov (United States)

    Alhaisoni, Eid; Gaudel, Daya Ram; Al-Zuoud, Khalid M.

    2017-01-01

    This study aims at providing a comprehensive account of the types of errors produced by Saudi EFL students enrolled in the preparatory year programe in their use of articles, based on the Surface Structure Taxonomies (SST) of errors. The study describes the types, frequency and sources of the definite and indefinite article errors in writing…

  4. Development of Preparatory Activity Indexed by the Contingent Negative Variation in Children

    Science.gov (United States)

    Flores, Angelica B.; Digiacomo, Marcia R.; Meneres, Susana; Trigo, Eva; Gomez, Carlos M.

    2009-01-01

    Objectives: The present study investigated the effect of age on task-specific preparatory activation induced by a spatial cue using the central cue Posner's paradigm. The behavioral responses and the contingent negative variation (CNV) generated between S1 (the warning stimulus) and S2 (the imperative stimulus) were compared between 16 healthy…

  5. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  6. Regulatory Commission of Alaska

    Science.gov (United States)

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  7. Guidelines for residential commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  8. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  9. Study of junior weight lifters’ special fitness with different methods of speed-power training in preparatory period of general preparatory stage

    Directory of Open Access Journals (Sweden)

    O. B. Piven

    2015-09-01

    Full Text Available Purpose: studying of junior weight lifters’ special fitness in preparatory period of general preparatory stage. Material: 30 junior weight lifters of 12 - 14 years’ old age were involved in experiment (2 nd and 3 rd sport grades. Results: optimal indicators of training by shock method have been determined for sportsmen of experimental group. Scope of loads was: squats with barbell on shoulders - lifting 779 times (90 tons; 310 jumps in depth and jumps out. Power indicators in total of combined exercises have increased by 16.5 kg. In control group other methodic was used. In control group scope of loads was: lifting of barbell - 910 times (111 tons. Power indicators in total of combined exercises have increased by 7.2 kg. Conclusions: the following regiment of training is recommended: first 3 weeks - jumps. Dozing and load scopes shall be as follows: first two trainings - two attempts (10 times each with height of 0.5 m; third training - 3 attempts (10 times each with height of 0.5 m; forth training - 4 attempts (10 times each with height of 0.7 m. Jumps in depth shall be used 3 times weekly.

  10. Programme of Preparatory Activities on Launching First Nuclear Power Plant in Croatia

    International Nuclear Information System (INIS)

    Jakic, I.; Lebegner, J.; Perovic, N.

    2010-01-01

    New Croatian energy policy recognizes nuclear energy as solution for rising needs for energy and, thus, opens the possibility to construct first nuclear power plant in Croatia. Within this frame, the Croatian government is developing an implementation programme according to this policy and preparing basis for making decision about construction of nuclear power plant. Croatian parliament is responsible for this decision which is expected by the end of 2012. During this period, stake holders in this project (government, regulatory body and future operator of the plant) have to complete activities of preparatory phase of Croatian Nuclear Energy Programme (CRONEP) project according to methodology recommended by IAEA (International Atomic Energy Agency). This paper defines these activities and estimate the costs of first, preparatory phase based on previous experience of other countries which finished the phase successfully. Also, it describes the potential role of Croatian utility as stake holder due to its experience as co-owner of Nuclear power plant Krsko.(author).

  11. Advanced Cancer Patients' Perceptions of Dignity: The Impact of Psychologically Distressing Symptoms and Preparatory Grief.

    Science.gov (United States)

    Kostopoulou, Sotiria; Parpa, Efi; Tsilika, Eleni; Katsaragakis, Stylianos; Papazoglou, Irene; Zygogianni, Anna; Galanos, Antonis; Mystakidou, Kyriaki

    2018-04-01

    The present study assesses the relationship between patient dignity in advanced cancer and the following variables: psychological distress, preparatory grief, and sociodemographic and clinical characteristics. The sample consisted of 120 patients with advanced cancer. The self-administered questionnaires were as follows: the Preparatory Grief in Advanced Cancer Patients (PGAC), the Patient Dignity Inventory-Greek (PDI-Gr), the Greek Schedule for Attitudes toward Hastened Death (G-SAHD), and the Greek version of the Hospital Anxiety and Depression Scale (G-HADS). Moderate to strong statistically significant correlations were found between the 4 subscales of PDI-Gr (psychological distress, body image and role identity, self-esteem, and social support) with G-HADS, G-SAHD, and PGAC ( P dignity among patients with advanced cancer. Clinicians should assess and attend to dignity-distressing factors in the care of patients with advanced cancer.

  12. Technical skill improvement with surgical preparatory courses: What advantages are reflected in residency?

    Science.gov (United States)

    Green, Courtney A; Huang, Emily; Zhao, Nina W; O'Sullivan, Patricia S; Kim, Edward; Chern, Hueylan

    2017-11-01

    Sustainability of skill acquisition gained from graduating medical student (GMS) preparatory courses remains uncertain. GMS skills were assessed before (T1) and after a preparatory course (T2) and then again 2 (T3) and 4 (T4) months into residency and compared to surgical interns without such a course. In April, GMS took the preparatory course. In July-August all interns participated in a basic skills curriculum. Learners completed four technical exercises pre/post each course. Three surgeons scored performances. GMS scores were compared across the 4 time points. Control interns were compared at T3 and T4. Thirty-two interns completed all pre/post course assessments (T3 and T4); seven of those were GMSs. GMS scores increased from 74.5%(T1) to 94.2%(T2) (p starting residency compared to control interns (T3, 89.08% vs 65.03%, p start. Without such course, interns require a steep learning curve. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. The Lhc beam commissioning

    International Nuclear Information System (INIS)

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  14. The Danish Welfare Commission

    DEFF Research Database (Denmark)

    Gjerding, Allan Næs

    2006-01-01

    on public services, and install economic incentives for the behaviour of private households. The paper then digs into the proposals of the commission that are broadly grouped into five policy target areas con-cerning (1) the ageing of the population, (2) the incentives for labour market participation, (3......The paper deals with the main report of the Danish Welfare Commission and the one-hundred-and-nine proposals on the structure of the future Danish welfare state that the com-mission has put forward. Following upon a brief review of the discussion on the work of the Danish Welfare Commission......) competitiveness in the global economy, (4) behavioural regulation of the use of public bene-fits and services, and (5) management within tight budgets of an increasing demand on health and care. Finally, the concluding section sums up the discussion and elaborates on the debate on the Welfare Commission’s work...

  15. Commissioning for Humidified Buildings

    National Research Council Canada - National Science Library

    Deal, Brian

    1998-01-01

    .... Although proper commissioning procedures have been noted to reduce the potential for approximately 70 percent of these claims, no standards exist for the control of moisture migration in building...

  16. Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission Issuance

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  10. "Preparatory power posing affects nonverbal presence and job interview performance": Correction to Cuddy et al. (2015).

    Science.gov (United States)

    2018-05-01

    Reports an error in "Preparatory power posing affects nonverbal presence and job interview performance" by Amy J. C. Cuddy, Caroline A. Wilmuth, Andy J. Yap and Dana R. Carney ( Journal of Applied Psychology , 2015[Jul], Vol 100[4], 1286-1295). In the article, the degrees of freedom associated with the three F-tests noted on pages 1289 and 1290 should be 1 and 59 (and not 1 and 60, as previously reported). Also, on p. 1290, in the first sentence under the "Mediation" heading, it should be noted that the dependent variables were regressed onto the mediators, and not the other way around. Finally, in Figures 2 and 3 (on p.interview-preparatory power posing-would enhance performance during the interview. Participants adopted high-power (i.e., expansive, open) poses or low-power (i.e., contractive, closed) poses, and then prepared and delivered a speech to 2 evaluators as part of a mock job interview. All interview speeches were videotaped and coded for overall performance and hireability and for 2 potential mediators: verbal content (e.g., structure, content) and nonverbal presence (e.g., captivating, enthusiastic). As predicted, those who prepared for the job interview with high- (vs. low-) power poses performed better and were more likely to be chosen for hire; this relation was mediated by nonverbal presence, but not by verbal content. Although previous research has focused on how a nonverbal behavior that is enacted during interactions and observed by perceivers affects how those perceivers evaluate and respond to the actor, this experiment focused on how a nonverbal behavior that is enacted before the interaction and unobserved by perceivers affects the actor's performance, which, in turn, affects how perceivers evaluate and respond to the actor. This experiment reveals a theoretically novel and practically informative result that demonstrates the causal relation between preparatory nonverbal behavior and subsequent performance and outcomes. (PsycINFO Database

  11. Utilization of reward-prospect enhances preparatory attention and reduces stimulus conflict.

    Science.gov (United States)

    van den Berg, Berry; Krebs, Ruth M; Lorist, Monicque M; Woldorff, Marty G

    2014-06-01

    The prospect of gaining money is an incentive widely at play in the real world. Such monetary motivation might have particularly strong influence when the cognitive system is challenged, such as when needing to process conflicting stimulus inputs. Here, we employed manipulations of reward-prospect and attentional-preparation levels in a cued-Stroop stimulus conflict task, along with the high temporal resolution of electrical brain recordings, to provide insight into the mechanisms by which reward-prospect and attention interact and modulate cognitive task performance. In this task, the cue indicated whether or not the participant needed to prepare for an upcoming Stroop stimulus and, if so, whether there was the potential for monetary reward (dependent on performance on that trial). Both cued attention and cued reward-prospect enhanced preparatory neural activity, as reflected by increases in the hallmark attention-related negative-polarity ERP slow wave (contingent negative variation [CNV]) and reductions in oscillatory Alpha activity, which was followed by enhanced processing of the subsequent Stroop stimulus. In addition, similar modulations of preparatory neural activity (larger CNVs and reduced Alpha) predicted shorter versus longer response times (RTs) to the subsequent target stimulus, consistent with such modulations reflecting trial-to-trial variations in attention. Particularly striking were the individual differences in the utilization of reward-prospect information. In particular, the size of the reward effects on the preparatory neural activity correlated across participants with the degree to which reward-prospect both facilitated overall task performance (shorter RTs) and reduced conflict-related behavioral interference. Thus, the prospect of reward appears to recruit attentional preparation circuits to enhance processing of task-relevant target information.

  12. Does practicing a skill with the expectation of teaching alter motor preparatory cortical dynamics?

    Science.gov (United States)

    Daou, Marcos; Lohse, Keith R; Miller, Matthew W

    2018-05-01

    Recent evidence suggests practicing a motor skill with the expectation of teaching it enhances learning by increasing information processing during motor preparation. However, the specific motor preparatory processes remain unknown. The present study sought to address this shortcoming by employing EEG to assess participants' motor preparatory processes while they completed a golf putting pretest, and then practiced putting with the expectation of (a) teaching another participant how to putt the next day (teach group, n = 30), or (b) being tested on their putting the next day (test group, n = 30). Participants' EEG during the 3-s prior to and 1-s after initiating putter movement was analyzed. All participants completed posttests 1 day after the practice session. The teach group exhibited better posttest performance (superior learning) relative to the test group, but no group differences in motor preparatory processing (EEG) emerged. However, participants in both groups exhibited linear decreases in both theta power at frontal midline and upper-alpha power over motor areas during putt initiation. These results suggest a decrease in working memory and action monitoring (frontal midline theta), and an increase in motor programming (motor upper-alpha) during putt initiation. Further, participants in both groups exhibited increased frontal midline theta from pretest to practice, but decreases in both upper motor-alpha and upper-alpha coherence between left/right temporal and motor planning regions. These results suggest participants utilized working memory and action monitoring to a greater extent during practice relative to pretest, while refining their motor programming and verbal-analytic/visuospatial involvement in motor programming. Copyright © 2018 Elsevier B.V. All rights reserved.

  13. Commissioning of ATLAS

    CERN Document Server

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  14. ATF2 Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  15. ATF2 COMMISSIONING

    CERN Document Server

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  16. [Fathers of first infants--preparatory courses about delivery, experience of delivery and paternity leave].

    Science.gov (United States)

    Aagaard, J; Dueholm, M; Nielsen, K T; Wiese, J; Strand, J E; Jangaard, J K

    1989-05-22

    In the Central Hospital in Randers, 233 fathers of first infants replied to a questionnaire which illustrated their attitudes to the preparatory courses about delivery, experience of delivery and attitudes to paternity leave. 65% of the fathers participated in the course and 74% stated that they considered that this had been profitable. Where 77% of the men were concerned, these considered that participation in delivery had been a positive experience. 73% of the men had planned paternity leave around the time of delivery, which emphasizes the need for this arrangement.

  17. Strengthening moral reasoning through dedicated ethics training in dietetic preparatory programs.

    Science.gov (United States)

    Hewko, Sarah J; Cooper, Sarah L; Cummings, Greta G

    2015-01-01

    Moral reasoning skills, associated with the ability to make ethical decisions effectively, must be purposively fostered. Among health professionals, enhanced moral reasoning is linked to superior clinical performance. Research demonstrates that moral reasoning is enhanced through dedicated, discussion-based ethics education offered over a period of 3-12 weeks. Current dietetic students and practicing dietitians seeking to strengthen their moral reasoning skills can undertake elective ethics education. Further research within dietetic preparatory programs is warranted to better inform the development and implementation of ethics courses. Copyright © 2015 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

  18. Common-sense ethics in administrative decision making. Part I, Preparatory steps.

    Science.gov (United States)

    Sullivan, P A; Brown, T

    1991-10-01

    This is Part 1 of two articles demonstrating the relevance of business ethics to nurse administrators as they confront value-laden issues such as the advantages and disadvantages of 10-12-hour scheduling patterns, understaffing, emerging registered nurse partnerships, and other administrative problems. Common-sense ethics can serve as the basis of just administrative decisions. The authors present a model of preparatory attitudes and behaviors. The steps that they propose do not guarantee success, but if implemented, they may facilitate the nurse administrator's management of diverse ethical issues.

  19. Preparatory steps for a robust dynamic model for organically bound tritium dynamics in agricultural crops

    Energy Technology Data Exchange (ETDEWEB)

    Melintescu, A.; Galeriu, D. [' Horia Hulubei' National Institute for Physics and Nuclear Engineering, Bucharest-Magurele (Romania); Diabate, S.; Strack, S. [Institute of Toxicology and Genetics, Karlsruhe Institute of Technology - KIT, Eggenstein-Leopoldshafen (Germany)

    2015-03-15

    The processes involved in tritium transfer in crops are complex and regulated by many feedback mechanisms. A full mechanistic model is difficult to develop due to the complexity of the processes involved in tritium transfer and environmental conditions. First, a review of existing models (ORYZA2000, CROPTRIT and WOFOST) presenting their features and limits, is made. Secondly, the preparatory steps for a robust model are discussed, considering the role of dry matter and photosynthesis contribution to the OBT (Organically Bound Tritium) dynamics in crops.

  20. 78 FR 32295 - Commission Meeting

    Science.gov (United States)

    2013-05-29

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: June 20...

  1. 77 FR 10599 - Commission Meeting

    Science.gov (United States)

    2012-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 15...

  2. 78 FR 12412 - Commission Meeting

    Science.gov (United States)

    2013-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 21...

  3. 77 FR 28420 - Commission Meeting

    Science.gov (United States)

    2012-05-14

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: June 7, 2012, at 9...

  4. 78 FR 52601 - Commission Meeting

    Science.gov (United States)

    2013-08-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: September 19, 2013...

  5. 77 FR 70204 - Commission Meeting

    Science.gov (United States)

    2012-11-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice. DATES: December 14, 2012...

  6. 78 FR 69517 - Commission Meeting

    Science.gov (United States)

    2013-11-19

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: December 12, 2013...

  7. 77 FR 52106 - Commission Meeting

    Science.gov (United States)

    2012-08-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: September 20...

  8. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  6. DESY: HERA commissioning

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  7. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  11. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Features of high-speed and strength qualities development in young biathlonists aged 14–15 in the preparatory period

    Directory of Open Access Journals (Sweden)

    Artem Burla

    2015-04-01

    Full Text Available Purpose: to substantiate a methodology of high-speed and strength qualities development of young biathlonists aged 14–15 during the preparatory period. Material and Methods: young biathlonists aged 14–15 from control and experimental groups took part in the research. There were 12 athletes in each group. Pedagogical methods and methods of mathematical statistics were used in the work. Pedagogical methods of researches were used for level definition of high-speed and strength qualities development of young biathlonists. Results: reliable increase of motive qualities and polydynamometry results testing of young biathlonists from the experimental group due to implementation of the experimental methodology in the preparatory period is established. Conclusions: application of the developed complexes in the preparatory period in the experimental group of young biathlonists aged 14–15 allows to raise indices of motive qualities and polydynamometry testing statistically significantly.

  5. Increase the level of preparedness of qualified basketball players in the preparatory period

    Directory of Open Access Journals (Sweden)

    Volodymyr Gradusov

    2017-08-01

    Full Text Available Purpose: to study the adaptation of basketball players of student teams to training loads during the preparatory period of the annual cycle of training on the parameters of motor qualities and functional readiness. Material & Methods: conducted a survey of 12 basketball players on the team (Sumy, the highest league of the Ukrainian Basketball Championship. The following research methods were used: theoretical analysis of literary sources, methods of mathematical statistics, anthropometry and pedagogical control. Result: dynamics of changes at the stage of preparation for the season is shown. It is established and observed that under the influence of training sessions in the examined basketball players, not only the optimization of the functional systems of their organism, but also the level of the functional state of the organism as a whole. Conclusion: assessment of the functional condition of the athlete's body should play an important role in the overall system of medical and biological control in connection with significant additional information on the state of their body and the possibility of timely correction of physical activity and the provision of preventive measures. It is determined that during the preparatory period the level of motor qualities and functional readiness of the basketball players increased.

  6. Neural correlates of preparatory and regulatory control over positive and negative emotion.

    Science.gov (United States)

    Seo, Dongju; Olman, Cheryl A; Haut, Kristen M; Sinha, Rajita; MacDonald, Angus W; Patrick, Christopher J

    2014-04-01

    This study used functional magnetic resonance imaging to investigate brain activation during preparatory and regulatory control while participants (N = 24) were instructed either to simply view or decrease their emotional response to, pleasant, neutral or unpleasant pictures. A main effect of emotional valence on brain activity was found in the right precentral gyrus, with greater activation during positive than negative emotion regulation. A main effect of regulation phase was evident in the bilateral anterior prefrontal cortex (PFC), precuneus, posterior cingulate cortex, right putamen and temporal and occipital lobes, with greater activity in these regions during preparatory than regulatory control. A valence X regulation interaction was evident in regions of ventromedial PFC and anterior cingulate cortex, reflecting greater activation while regulating negative than positive emotion, but only during active emotion regulation (not preparation). Conjunction analyses revealed common brain regions involved in differing types of emotion regulation including selected areas of left lateral PFC, inferior parietal lobe, temporal lobe, right cerebellum and bilateral dorsomedial PFC. The right lateral PFC was additionally activated during the modulation of both positive and negative valence. Findings demonstrate significant modulation of brain activity during both preparation for, and active regulation of positive and negative emotional states.

  7. Markers of preparatory attention predict visual short-term memory performance.

    Science.gov (United States)

    Murray, Alexandra M; Nobre, Anna C; Stokes, Mark G

    2011-05-01

    Visual short-term memory (VSTM) is limited in capacity. Therefore, it is important to encode only visual information that is most likely to be relevant to behaviour. Here we asked which aspects of selective biasing of VSTM encoding predict subsequent memory-based performance. We measured EEG during a selective VSTM encoding task, in which we varied parametrically the memory load and the precision of recall required to compare a remembered item to a subsequent probe item. On half the trials, a spatial cue indicated that participants only needed to encode items from one hemifield. We observed a typical sequence of markers of anticipatory spatial attention: early attention directing negativity (EDAN), anterior attention directing negativity (ADAN), late directing attention positivity (LDAP); as well as of VSTM maintenance: contralateral delay activity (CDA). We found that individual differences in preparatory brain activity (EDAN/ADAN) predicted cue-related changes in recall accuracy, indexed by memory-probe discrimination sensitivity (d'). Importantly, our parametric manipulation of memory-probe similarity also allowed us to model the behavioural data for each participant, providing estimates for the quality of the memory representation and the probability that an item could be retrieved. We found that selective encoding primarily increased the probability of accurate memory recall; that ERP markers of preparatory attention predicted the cue-related changes in recall probability. Copyright © 2011. Published by Elsevier Ltd.

  8. Commissioning of the LHC

    CERN Multimedia

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety nd Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  12. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  13. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  14. Commission on Social Security

    CERN Multimedia

    Staff Association

    2010-01-01

    A commission studying past, present, and future social stakes ! For many years we have been hearing about the problems of funding of health insurance benefits in our different Member States. At CERN we are not totally immune from this problem.  To start with, let us recall that we have a mutual-benefit scheme which covers everyone for the consequences of the uncertainties in life (illness and accidents). The rules of our scheme are established by CERN in the framework of a sub-group of the Standing Concertation Committee, the CERN Health Insurance Scheme Board (CHISB), which is also in charge of managing the scheme.  The work of the “ProtSoc” (Protection Sociale – Social Security) commission, as we like to call it at the Staff Association, is to help your representatives on the CHISB, by preparing together with them the subjects and positions to be put forward and defended. This commission, which groups together the staff delegates who wish to invest their ...

  15. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  16. A Guide to Building Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  17. Relationships between stress, coping and depressive symptoms among overseas university preparatory Chinese students: a cross-sectional study

    Directory of Open Access Journals (Sweden)

    Yeh Gwo-Liang

    2011-05-01

    Full Text Available Abstract Background Mental health problems in young people are an important public health issue. Students leaving their hometown and family at a young age to pursue better educational opportunities overseas are confronted with life adjustment stress, which in turn affects their mental health and academic performance. This study aimed to examine the relationships among stress, coping strategies, and depressive symptoms using the stress coping framework in overseas Chinese university preparatory students in Taiwan. Methods A cross-sectional study was conducted at an overseas Chinese university preparatory institute in Taiwan. Of enrolled overseas Chinese university preparatory students at 2009, 756 completed a structured questionnaire measuring stress, strategies for coping with it, and the Center for Epidemiologic Studies Depression Scale. Results High levels of stress significantly predicted the adoption of active, problem-focused coping strategies (R2 = 0.13, p R2 = 0.24, p z = 8.06, p Conclusion Our study results suggested that stress is associated with coping strategies and depressive symptoms and passive strategies mediate the relation between stress and depressive symptoms in overseas Chinese university preparatory students.

  18. English language proficiency and academic performance: A study of a medical preparatory year program in Saudi Arabia.

    Science.gov (United States)

    Kaliyadan, Feroze; Thalamkandathil, Nazer; Parupalli, Srinivas Rao; Amin, Tarek Tawfik; Balaha, Magdy Hassan; Al Bu Ali, Waleed Hamad

    2015-01-01

    All medical schools in Saudi Arabia have English as the primary official medium of instruction. Most of the high school education, however, is delivered in Arabic and hence the transition to an English based learning environment tends to be difficult for some students. Our study aims to correlate English language proficiency with academic performance among medical students in their preparatory year. A cross-sectional study design was used. Test scores of 103 preparatory year students (54 female and 49 male) were analyzed after the students completed an English language course and medical introductory course in their preparatory year. The total score obtained in the English course assessment was compared to each component of the medical content assessment. A significantly positive correlation (Spearman's Rho, at 0.01 levels) was seen between the scores of the English exam and the written exam (P English exam score was not obtained for the other components of the medical assessment, namely; student assignments, presentations and portfolios. English language proficiency is an important factor in determining academic proficiency of medical students in our college at the preparatory year level.

  19. The Silence about Oral Presentation Skills in Distance and Online Education: New Perspectives from an Australian University Preparatory Programme

    Science.gov (United States)

    McDougall, Jenny; Holden, Helen

    2017-01-01

    Oral presentation skills are considered essential workplace skills and are therefore highly valued in higher education. However, research into this aspect of adult learning is limited, especially in the context of distance and online education. This paper reports on an innovative approach used in a university preparatory program in Australia.…

  20. Effects of preparatory and action planning instructions on situation-specific and general fruit and snack intake

    NARCIS (Netherlands)

    de Bruijn, G.-J.; Nguyen, M.H.; Rhodes, R.E.; van Osch, L.

    Evidence to date suggests heterogeneity in the effects of implementation intentions on health behaviour, including diet. Additional variables and study designs may impact on their effectiveness. Preparatory action, such as making sure fruits are available for consumption, may be an important

  1. Discussion: European Commission policy

    International Nuclear Information System (INIS)

    Coldwell, R.

    1993-01-01

    This paper documents the debate which arose following two papers presented to a seminar run by the Centre for the Study of Regulated Industries, on 11th November 1992, on European Commission (EC) energy policies. The issues raised cover how an internal market for electricity and natural gas will be implemented under a proposed EC directive, bearing in mind the level of opposition from a number of Member States. How this Directive will apply to vertically integrated structures, such as Scottish Electricity Industry, is also considered. (UK)

  2. Commissioning of the SCT

    International Nuclear Information System (INIS)

    Hayward, Helen

    2010-01-01

    In September 2008, the large hadron collider (LHC) at CERN was switched on with successful tests of circulating beam in both directions of the ring. The ATLAS semiconductor tracker (SCT) has been installed in the ATLAS cavern since summer 2007 and then integrated with the rest of the ATLAS subdetectors, in preparation for this event. After the SCT was assembled on the surface, the process of being commissioned using cosmic ray events began, and continued after the SCT was installed in the cavern with the rest of the ATLAS detector. Performance results will be given for the recent cosmic runs.

  3. Biosensor technology for the detection of illegal drugs I: objectives, preparatory work, and drug enrichment

    Science.gov (United States)

    Hilpert, Reinhold; Binder, Florian; Grol, Michael; Hallermayer, Klaus; Josel, Hans-Peter; Klein, Christian; Maier, Josef; Oberpriller, Helmut; Ritter, Josef; Scheller, Frieder W.

    1994-10-01

    In a joint project of Deutsche Aerospace, Boehringer Mannheim and the University of Potsdam portable devices for the detection of illegal drugs, based on biosensor technology, are being developed. The concept enrichment of the drug from the gas phase and detection by immunological means. This publication covers the description of our objectives, preparatory work and results concerning enrichment of drugs from the gas phase. Vapor pressures of cocaine and cannabinoids have been determined. A test gas generator has been constructed which allows for reproducible preparation of cocaine concentrations between 2 ng/l and 2 pg/l. Coupling of a thermodesorption unit with GC/MS has been established for reference analysis. As another analytical tool, an ELISA with a lower detection limit of about 0,5 pg cocaine/assay has been developed. Applying fleece-type adsorbers, enrichment factors for cocaine in the range of 105 have been realized. No significant interference was found with potentially disturbing substances.

  4. A CASE STUDY: WORKSHEETS USED IN A LANGUAGE PREPARATORY SCHOOL IN HIGHER EDUCATION

    Directory of Open Access Journals (Sweden)

    Buket KASAP

    2016-12-01

    Full Text Available The aim of this case study is to analyze the supplementary instructional materials, namely worksheets, used in an English preparatory school in one of the Turkish universities. The data were gathered from the materials development unit of the school. Using the content analysis method, worksheets from 2015 spring and 2016 spring terms were analyzed. The findings revealed that most worksheets included decontextualized, repetitive grammar activities though the theme-based course book included integrated skills activities, appealing various learning styles. It was also observed that students were evaluated based on their proficiency in basic four skills while they studied mostly grammar based worksheets. As a result, a shift to a more eclectic method which caters for all learning styles and equally includes all skills is suggested to the school board.

  5. Atomic Energy Commission Act, 1963

    International Nuclear Information System (INIS)

    1963-01-01

    Promulgated in 1963, the Atomic Energy Commission Act (204) established and vested in the Ghana Atomic Energy Commission the sole responsibility for all matters relating to the peaceful uses of atomic energy in the country. Embodied in the Act are provisions relating to the powers, duties, rights and liabilities of the Commission. (EAA)

  6. Commission 4: Ephemerides

    Science.gov (United States)

    Kaplan, George H.; Hohenkerk, Catherine Y.; Fukushima, Toshio; Arlot, Jean-Eudes; Bangert, John A.; Bell, Steven A.; Folkner, William M.; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrák, Jan

    2012-04-01

    The Commission 4 Organizing Committee began its work for the 2009-2012 triennium by revising the commission's terms of reference, which serve as our ``mission statement.'' The new terms of reference are:(a)Maintain cooperation and collaboration between the national offices providing ephemerides, prediction of phenomena, astronomical reference data, and navigational almanacs.(b)Encourage agreement on the bases (reference systems, time scales, models, and constants) of astronomical ephemerides and reference data in the various countries. Promote improvements to the usability and accuracy of astronomical ephemerides, and provide information comparing computational methods, models, and results to ensure the accuracy of data provided.(c)Maintain databases, available on the Internet to the national ephemeris offices and qualified researchers, containing observations of all types on which the ephemerides are based. Promote the continued importance of observations needed to improve the ephemerides, and encourage prompt availability of these observations, especially those from space missions, to the science community.(d)Encourage the development of software and web sites that provide astronomical ephemerides, prediction of phenomena, and astronomical reference data to the scientific community and public.Promote the development of explanatory material that fosters better understanding of the use and bases of ephemerides and related data.

  7. Commissioning the GTA accelerator

    International Nuclear Information System (INIS)

    Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Bowling, S.; Brown, S.; Cole, R.; Gilpatrick, J.D.; Garnett, R.; Guy, F.W.; Ingalls, W.B.; Johnson, K.F.; Kerstiens, D.; Little, C.; Lohsen, R.A.; Lloyd, S.; Lysenko, W.P.; Mottershead, C.T.; Neuschaefer, G.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Connolly, R.; Weiss, R.; Saadatmand, K.

    1992-01-01

    The Ground Test Accelerator (GTA) is being used to resolve the physics and engineering issues related to accelerating, focusing, and steering a high-brightness, high-current H - beam and then neutralizing it. The goal is to produce a 24 MeV, 50 mA device with a 2% duty factor. Specific features of the GTA -- injector, beam optics, rf linac structures, diagnostics, control and rf power systems are described. The first four steps in commissioning have been completed. The RFQ predicted and measured performances are in good agreement; however, the transmission is lower than specifications. Input emittance is larger than design specifications and increases the effects of image charge and multipoles. Displacement of steering magnets in either the horizontal or vertical plane caused beam displacements in both planes. It is suspected that quadrupole rotation is the cause of the coupled motion. 9 figs., 5 tabs., 11 refs

  8. Safety Commission databases support

    CERN Document Server

    Petit, S; CERN. Geneva. TS Department

    2005-01-01

    A collaboration project between the Safety Commission (SC) and the Controls, Safety and Engineering databases group (TS/CSE) started last year. The aim of this collaboration is to transfer several SC applications from their local environments onto the D7i-MTF EDMS framework, for which the TS/CSE group is responsible. Different domains of activity and projects have been defined in the areas of equipment management, safety inspections, accidents and risks management. Priorities have been established in collaboration with SC. This paper presents the new Safety Inspections Management system (SIM) which will be put in production before the summer 2005 and reviews the constraints of both the users and the development and operational framework that needed to be taken into account. The technical solutions adopted to assure a successful production start-up and operation of the SIM system are described. Progress on other on-going projects and plans for the next year are also reported.

  9. GP commissioning in England.

    Science.gov (United States)

    Charlton, Rodger

    2013-02-01

    The NHS, yet again, is in transition with an emphasis on groups of general practitioners (GPs) (clinical commissioning groups) making decisions on which specialist services should be chosen for patients requiring referral from primary care. It is an area of new terminology with a new language and further change for all working in the NHS and the all-important interface between primary and secondary care, and its impact on teamwork. There are many drivers including choice, efficiency, franchising of services, coordination and leadership in an enormous organisation, but not least reducing costs and keeping to a budget. There are many logistical issues and ethical anxieties, and only time will inform patients, practitioners, stakeholders and politicians as to its success.

  10. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  11. JUSTIFICATION OF THE EXISTENCE OF PREPARATORY GROUPS IN SPECIAL SCOOLS FOR CHILDREN LIGHTLY HANDICAPPED

    Directory of Open Access Journals (Sweden)

    Aneta ANDONAKIS

    1997-03-01

    Full Text Available Researches about child’s intellectual development in the psychology has started in the 19th century and the first step has been made by Tiedemann in “ Observation of the development of the mental abilities of the children”. His work caused a great interest in the circles of doctors and psychologists. Their interpretation of intelligence was different, but the most acceptable is the performance of complicated activities for getting knowledge and skills and getting over the obstacles in the development of the person”.The social ability do not correspond with the intelligence. The two aspects are tested and a complete picture of their functioning can be seen. The developmental principle is determined from general to the separate as functionally connected.In the period when a child does not accept the higher level of intelligence and thinking , in relation to which are effectuated by sense-motor activities, than we say that a child is mentally handicapped. The widest approach of the educational system should be treated as a functional, institutional and organizational, that takes part in the realization of the social aims and tasks.Not getting into viewing of the curriculum's and programs for preparatory groups in the preeducational period, we may say that the justification for the existence of these group in the regular schools, is maturation of the perceptive motor coordination and learning. With the maturing the function of the "ego" is increasing.As a child adapts better he can learn better, and the maturity comes sooner. In this way these groups are justified.Mentally handicapped child has not the opportunity to attend an organized prepared education which provides:-forming of the speech, self-control, which can be achieved in the process of learning through a direct contact with other children;· regulation of the lateralization through re-education of the psycho-motor abilities, and in general neuro-motor experienced maturation

  12. A Virtual Commissioning Learning Platform

    DEFF Research Database (Denmark)

    Mortensen, Steffen; Madsen, Ole

    2018-01-01

    The introduction of reconfigurable manufacturing systems (RMS), Industry 4.0 and the associated technologies requires the establishment of new competencies. Towards that goal, Aalborg University (AAU) has developed an Industry 4.0 learning factory, the AAU Smart Production Lab. The AAU Smart...... Production Lab integrates a number of Industry 4.0 technologies for learning and research purposes. One of the many techniques is virtual commissioning. Virtual commissioning uses a virtual plant model and real controllers (PLCs) enabling a full emulation of the manufacturing system for verification. Virtual...... commissioning can lower the commissioning time up to 63%, allowing faster time to market. However, virtual commission is still missing industrial impact one of the reasons being lack of competencies and integration experiences. The paper presents the setup of the virtual commissioning learning platform...

  13. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  14. Liberalism, authority, and bioethics commissions.

    Science.gov (United States)

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  15. Commissioning of NSLS-II

    Energy Technology Data Exchange (ETDEWEB)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  16. National Knowledge Commission

    Science.gov (United States)

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  17. Commissioning the SNO+ Detector

    Science.gov (United States)

    Caden, E.; Coulter, I.; SNO+ Collaboration

    2017-09-01

    SNO+ is a multipurpose liquid scintillator neutrino experiment based at SNOLAB in Sudbury, Ontario, Canada. The experiment’s main physics goal is a search for neutrinoless double beta decay in Tellurium-130, but SNO+ will also study low energy solar neutrinos, geo- and reactor-antineutrinos, among other topics. We are reusing much of the hardware from the original SNO experiment, but significant work has taken place to transform the heavy water detector into a liquid scintillator detector. We present upgrades and improvements to the read-out electronics and trigger system to handle the higher data rates expected by a scintillator experiment. We show the successful installation and testing of a hold-down rope net for the acrylic vessel to counter-act the buoyancy of organic liquid scintillator. We also describe the new scintillator process plant and cover gas systems that have been constructed to achieve the purification necessary to meet our physics goals. We are currently commissioning the experiment with ultra-pure water in preparation for filling with scintillator in early 2017 and present the current status of this work.

  18. Post commissioning noise study

    International Nuclear Information System (INIS)

    Heraud, P.

    2008-01-01

    This presentation described a wind farm post-commissioning study conducted at a wind farm owned by Helimax Energy Inc. The farm was located in a partly-forested, partly cultivated region in Quebec that featured gently rolling hills. Over 600 dwellings were located within 2 km of the wind farm, and 44 dwellings were within the wind farm's boundaries. The noise impact assessments were conducted at various points near the wind farm. The wind farm was designed using an International Standards Organization (ISO) noise propagation model and a 40 dBA to provide adequate setbacks. The study was conducted using 10 days of continuous measurements at selected points of a wind farm. Points of reception included points from 650 m to 800 m. Noise over 2 km was not thought to be contributed by the wind turbine. The nearest dwelling was 512 m from one of the farm's wind turbines. The study also considered ground factor, temperature, relative humidity, and the height of the receptors. Quebec noise level limits are 40 dBA at night, and 45 dBA during the day. Noise level limits are independent of wind speed. Measured noise contributions over 40 dBA were not observed during the measurement program. The wind turbines were only audible for 1 night out of the 30 night study period. It was concluded that the ISO noise propagation model is a reliable tool for conducting noise impact assessments. tabs., figs

  19. LEIR commissioning successfully completed

    CERN Multimedia

    2006-01-01

    An important milestone has been passed in the preparation of the injector complex to supply ions to the LHC experiments. The LEIR lead-ion beam, seen on one of the control screens just before the PS injection region. The Low-Energy Ion Ring - LEIR for short - has passed its first tests with flying colours. On 12 May, the ring that will accumulate lead ions for the LHC was shut down after seven months of tests (see Bulletin 44/2005). 'The commissioning phase was a resounding success,' enthuses a satisfied Michel Chanel, head of the LEIR construction project. After several months of fine-tuning, the LEIR team has achieved its aim of producing the kind of beam required for first lead-ion collisions in the LHC in 2008. This involved creating bunches containing 230 million ions, in line with the specifications for those first beams. This success can be put down to the machine's outstanding design and components. 'It's a great achivement by all the teams involved in the machine's construction,' underlines Christian...

  20. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  1. Qualification and preparatory activities for the manufacturing of 9 TF coils of the JT-60SA magnet

    International Nuclear Information System (INIS)

    Cucchiaro, Antonio; Polli, Gian Mario; Cocilovo, Valter; Drago, Giovanni; Cuneo, Stefano; Terzi, Franco; Peyrot, Marc; Phillips, Guy; Tomarchio, Valerio

    2013-01-01

    In the framework of the Broader Approach Agreement for the construction of the JT-60SA tokamak, ENEA is in charge to provide 9 of the 18 Toroidal Field (TF) coils. The 9 coils are being manufactured by ASG superconductors in Genoa under the supervision of ENEA in collaboration with the JT-60SA European home team. Prior the manufacturing, a preparatory activity has been carried out aimed at designing, constructing and setting-up the relevant components to be realized. In order to get confidence of some special manufacturing process, several qualification activities have been performed. In this paper an overview of the principal milestones reached during the preparatory phase and a description of the qualification activities with relevant test results are presented

  2. Comparative analysis of methods of training and dietary habits of skilled bodybuilders in the run-general preparatory stage

    Directory of Open Access Journals (Sweden)

    Dzhym V.Y.

    2015-02-01

    Full Text Available Purpose : comparative analysis of the characteristics of methods of training and nutrition bodybuilders in the run-general of the preparatory phase (duration 4 - 5 months or 20 microcycles. Analyzed the characteristics of different methods of training bodybuilders to increase muscle mass. Material : the study involved 8 skilled bodybuilders, are included in the team of the Kharkiv region. Results : a comparative characteristic of the most commonly used methods of exercise and nutrition in bodybuilding. Discovered and proved the optimal technique for athletes depending on the original form at the beginning of general-preparatory phase of training. Driven changes in body weight, depending on the amount used Athlete of carbohydrates, proteins and fats. Conclusions : throughout the training period was characterized by severe protein diet orientation. The proportion of the nutrient was 40% in the first quarter, 50% - in the second, 60% in the third. Only in the last two microcycle decreased to 50%.

  3. Functional Roles of Neural Preparatory Processes in a Cued Stroop Task Revealed by Linking Electrophysiology with Behavioral Performance.

    Science.gov (United States)

    Wang, Chao; Ding, Mingzhou; Kluger, Benzi M

    2015-01-01

    It is well established that cuing facilitates behavioral performance and that different aspects of instructional cues evoke specific neural preparatory processes in cued task-switching paradigms. To deduce the functional role of these neural preparatory processes the majority of studies vary aspects of the experimental paradigm and describe how these variations alter markers of neural preparatory processes. Although these studies provide important insights, they also have notable limitations, particularly in terms of understanding the causal or functional relationship of neural markers to cognitive and behavioral processes. In this study, we sought to address these limitations and uncover the functional roles of neural processes by examining how variability in the amplitude of neural preparatory processes predicts behavioral performance to subsequent stimuli. To achieve this objective 16 young adults were recruited to perform a cued Stroop task while their brain activity was measured using high-density electroencephalography. Four temporally overlapping but functionally and topographically distinct cue-triggered event related potentials (ERPs) were identified: 1) A left-frontotemporal negativity (250-700 ms) that was positively associated with word-reading performance; 2) a midline-frontal negativity (450-800 ms) that was positively associated with color-naming and incongruent performance; 3) a left-frontal negativity (450-800 ms) that was positively associated with switch trial performance; and 4) a centroparietal positivity (450-800 ms) that was positively associated with performance for almost all trial types. These results suggest that at least four dissociable cognitive processes are evoked by instructional cues in the present task, including: 1) domain-specific task facilitation; 2) switch-specific task-set reconfiguration; 3) preparation for response conflict; and 4) proactive attentional control. Examining the relationship between ERPs and behavioral

  4. Functional Roles of Neural Preparatory Processes in a Cued Stroop Task Revealed by Linking Electrophysiology with Behavioral Performance.

    Directory of Open Access Journals (Sweden)

    Chao Wang

    Full Text Available It is well established that cuing facilitates behavioral performance and that different aspects of instructional cues evoke specific neural preparatory processes in cued task-switching paradigms. To deduce the functional role of these neural preparatory processes the majority of studies vary aspects of the experimental paradigm and describe how these variations alter markers of neural preparatory processes. Although these studies provide important insights, they also have notable limitations, particularly in terms of understanding the causal or functional relationship of neural markers to cognitive and behavioral processes. In this study, we sought to address these limitations and uncover the functional roles of neural processes by examining how variability in the amplitude of neural preparatory processes predicts behavioral performance to subsequent stimuli. To achieve this objective 16 young adults were recruited to perform a cued Stroop task while their brain activity was measured using high-density electroencephalography. Four temporally overlapping but functionally and topographically distinct cue-triggered event related potentials (ERPs were identified: 1 A left-frontotemporal negativity (250-700 ms that was positively associated with word-reading performance; 2 a midline-frontal negativity (450-800 ms that was positively associated with color-naming and incongruent performance; 3 a left-frontal negativity (450-800 ms that was positively associated with switch trial performance; and 4 a centroparietal positivity (450-800 ms that was positively associated with performance for almost all trial types. These results suggest that at least four dissociable cognitive processes are evoked by instructional cues in the present task, including: 1 domain-specific task facilitation; 2 switch-specific task-set reconfiguration; 3 preparation for response conflict; and 4 proactive attentional control. Examining the relationship between ERPs and behavioral

  5. Ordinance on measures for preparation of a radioactive waste repository (Ordinance on preparatory measures) of 24 October 1979

    International Nuclear Information System (INIS)

    1981-01-01

    This Ordinance contains details concerning the special procedure provided for under Section 10(2) of the Federal Order of 6th October 1978 concerning the Atomic Energy Act whereby the Federal Council must grant permission before preparations for the construction of radioactive waste repositories may be undertaken. The Ordinance defines the preparatory measures, which include maps and plans of the area, a geological report, etc. (NEA) [fr

  6. Tracking chemistry self-efficacy and achievement in a preparatory chemistry course

    Science.gov (United States)

    Garcia, Carmen Alicia

    Self-efficacy is a person's own perception about performing a task with a certain level of proficiency (Bandura, 1986). An important affective aspect of learning chemistry is chemistry self-efficacy (CSE). Several researchers have found chemistry self-efficacy to be a fair predictor of achievement in chemistry. This study was done in a college preparatory chemistry class for science majors exploring chemistry self-efficacy and its change as it relates to achievement. A subscale of CAEQ, Chemistry Attitudes and Experiences Questionnaire (developed by Dalgety et al, 2003) as well as student interviews were used to determine student chemistry self-efficacy as it changed during the course. The questionnaire was given to the students five times during the semester: in the first class and the class before each the four tests taken through the semester. Twenty-six students, both men and women, of the four major races/ethnicities were interviewed three times during the semester and events that triggered changes in CSE were followed through the interviews. HLM (hierarchical linear modeling) was used to model the results of the CSE surveys. Among the findings, women who started at significantly lower CSE than men accomplished a significant gain by the end of the semester. Blacks' CSE trends through the semester were found to be significantly different from the rest of the ethnicities.

  7. The preparatory set: A novel approach to understanding "stress", trauma, and the bodymind therapies

    Directory of Open Access Journals (Sweden)

    Peter ePayne

    2015-04-01

    Full Text Available Basic to all motile life is a differential approach/avoid response to perceived features of environment. The stages of response are initial reflexive noticing and orienting to the stimulus, preparation, and execution of response. Preparation involves a coordination of many aspects of the organism: muscle tone, posture, breathing, autonomic functions, motivational/emotional state, attentional orientation and expectations. The organism organizes itself in relation to the challenge. We propose to call this the preparatory set (PS. We suggest that the concept of the PS can offer a more nuanced and flexible perspective on the stress response than do current theories. We also hypothesize that the mechanisms of bodymind therapeutic and educational systems (BTES can be understood through the PS framework. We suggest that the BTES, including meditative movement, meditation, somatic education, and the body-oriented psychotherapies, are approaches that use interventions on the PS to remedy stress and trauma. We discuss how the PS can be adaptive or maladaptive, how BTES interventions may restore adaptive PS, and how these concepts offer a broader and more flexible view of the phenomena of stress and trauma. We offer supportive evidence for our hypotheses, and suggest directions for future research. We believe that the PS framework will point to ways of improving the management of stress and trauma, and that it will suggest directions of research into the mechanisms of action of BTES.

  8. Student Views on Classroom Representative Meetings in the Preparatory Program of a Turkish University

    Directory of Open Access Journals (Sweden)

    Duygu Özbilen

    2015-04-01

    Full Text Available The present study intends to focus on the concept of “student voice” in higher education. Since democracy necessitates freedom and contribution, it cannot be underestimated that democracy can be maintained by the involvement of students in administration. The research conducted aims to shed a light onto the university students’ perception of “student voice” in university administration. Within this framework, classroom representatives of preparatory school elementary level students of a foundation university in Istanbul were analyzed. The data of the study were collected by focus group interviews and analyzed by content analysis using the qualitative analysis software Nvivo 10. According to the results, the classroom representatives consider themselves important and assume that their ideas are being valued. However, there are still some concerns about the future decisions of the administration in that some of their ideas might not be taken into account. They assume that the class representative meetings should be held more frequently to enable a more democratic university environment. The results of this study will be the basis for a larger scale study that includes the perception of more classroom representatives from different levels. In further studies the leadership style of the administrators will also be studied to find out the rationale behind the students’ attitudes towards the concept of student participation at the administration level.

  9. Into the pressure cooker: Student stress in college preparatory high schools.

    Science.gov (United States)

    Feld, Lauren D; Shusterman, Anna

    2015-06-01

    The goals of this study were to (1) measure psychological, physiological, and behavioral indicators of stress, (2) assess the relationship between stress and student attitudes, and (3) explore coping behaviors in response to stress, among a sample of students in two academically high-achieving environments. Three hundred thirty-three students in grades 9 through 12 from two college-preparatory high schools completed a cross-sectional online survey that included the Students' Life Satisfaction Scale, School Attitude Assessment Questionnaire-Revised, and assessments for stress-related indicators, including eating, sleeping and exercise, and strategies they utilized for coping with stress. Students reported a high prevalence of physical and psychological correlates of stress, and related unhealthy behaviors such as widespread and chronic sleep deprivation and rushed meals. The results suggest areas to focus attention for identifying and addressing maladaptive responses to stress among high-achieving student populations. Copyright © 2015 The Foundation for Professionals in Services for Adolescents. Published by Elsevier Ltd. All rights reserved.

  10. Intragroup Conflicts during Collaborative Writing in an ESL/EFL Preparatory Programme

    Directory of Open Access Journals (Sweden)

    Santini Pathinathan

    2012-11-01

    Full Text Available This paper seeks to investigate the types of conflicts that occur during collaborative writing among a group of ESL/EFL upper intermediate students in a preparatory programme. It also examines how these conflicts are resolved among the group members. A group consisting of four students was chosen for this study. Audio and video-recordings of collaborative sessions, semi-structured interviews and students’ journal were used in the data collection process. The results of this qualitative study showed that there were two prominent types of conflicts that occurred during the collaboration, namely, substantive conflict and affective conflict. Substantive conflict was found to be useful as the group was able to voice disagreements and consider alternative ideas. However, there was more evidence of affective conflict where the group had misunderstandings and differences due to personal views about group members. The study shows that the success of collaborative writing depends very much on how conflict is handled and resolved among the members.

  11. SmartCanvas: Context-inferred Interpretation of Sketches for Preparatory Design Studies

    KAUST Repository

    Zheng, Youyi

    2016-05-27

    In early or preparatory design stages, an architect or designer sketches out rough ideas, not only about the object or structure being considered, but its relation to its spatial context. This is an iterative process, where the sketches are not only the primary means for testing and refining ideas, but also for communicating among a design team and to clients. Hence, sketching is the preferred media for artists and designers during the early stages of design, albeit with a major drawback: sketches are 2D and effects such as view perturbations or object movement are not supported, thereby inhibiting the design process. We present an interactive system that allows for the creation of a 3D abstraction of a designed space, built primarily by sketching in 2D within the context of an anchoring design or photograph. The system is progressive in the sense that the interpretations are refined as the user continues sketching. As a key technical enabler, we reformulate the sketch interpretation process as a selection optimization from a set of context-generated canvas planes in order to retrieve a regular arrangement of planes. We demonstrate our system (available at http:/geometry.cs.ucl.ac.uk/projects/2016/smartcanvas/) with a wide range of sketches and design studies. © 2016 The Author(s) Computer Graphics Forum © 2016 The Eurographics Association and John Wiley & Sons Ltd. Published by John Wiley & Sons Ltd.

  12. The SCD - Stem Cell Differentiation ESA Project: Preparatory Work for the Spaceflight Mission

    Science.gov (United States)

    Versari, Silvia; Barenghi, Livia; van Loon, Jack; Bradamante, Silvia

    2016-04-01

    Due to spaceflight, astronauts experience serious, weightlessness-induced bone loss because of an unbalanced process of bone remodeling that involves bone marrow mesenchymal stem cells (BMSCs), as well as osteoblasts, osteocytes, and osteoclasts. The effects of microgravity on osteo-cells have been extensively studied, but it is only recently that consideration has been given to the role of BMSCs. Previous researches indicated that human BMSCs cultured in simulated microgravity (sim-μg) alter their proliferation and differentiation. The spaceflight opportunities for biomedical experiments are rare and suffer from a number of operative constraints that could bias the validity of the experiment itself, but remain a unique opportunity to confirm and explain the effects due to microgravity, that are only partially activated/detectable in simulated conditions. For this reason, we carefully prepared the SCD - STEM CELLS DIFFERENTIATION experiment, selected by the European Space Agency (ESA) and now on the International Space Station (ISS). Here we present the preparatory studies performed on ground to adapt the project to the spaceflight constraints in terms of culture conditions, fixation and storage of human BMSCs in space aiming at satisfying the biological requirements mandatory to retrieve suitable samples for post-flight analyses. We expect to understand better the molecular mechanisms governing human BMSC growth and differentiation hoping to outline new countermeasures against astronaut bone loss.

  13. Preparatory research for development of a capacitance sensor monitoring the liquid fraction in an inclined pipe

    International Nuclear Information System (INIS)

    Ko, Min Seok; Lee, Bo An; Kim, Sin; Yun, Byong Jo

    2012-01-01

    Two phase flow is a highly general phenomenon in various engineering fields including thermal hydraulic systems of the nuclear power plant. In particular, the liquid fraction in two phase system is one of the most important parameters to be considered for efficient system design and analysis. There have been various methods for the liquid fraction measurement. Wojtan et al. employed an optical fiber for liquid fraction measurement. Elbow and Rezkallah adopted the capacitance signal, Tsochatzidis et al. and Fossa used the conductance response in order to monitor the liquid fraction in various two phase flow regimes. The electrical methods are based on the fact that the liquid and gas have different conductivity and permittivity values, and these electrical properties directly correspond to phase distributions. In the capacitance method, in particular, one or more pairs of electrodes attached inside or outside the pipe wall measure the capacitance between electrode pairs and this measured capacitance signal is directly converted to the liquid fraction. In this work, as a preparatory research for development of a capacitance sensor monitoring the liquid fraction in an inclined pipe whose diameter and inclination angle are 45mm and 3rad, respectively, a capacitance is designed. Also, data evaluation procedures of a wire mesh sensor which would be employed for the verification of capacitance sensor performance are verified by comparing static experiments

  14. NPOESS Preparatory Project Validation Program for Atmsophere Data Products from VIIRS

    Science.gov (United States)

    Starr, D.; Wong, E.

    2009-12-01

    The National Polar-orbiting Operational Environmental Satellite Suite (NPOESS) Program, in partnership with National Aeronautical Space Administration (NASA), will launch the NPOESS Preparatory Project (NPP), a risk reduction and data continuity mission, prior to the first operational NPOESS launch. The NPOESS Program, in partnership with Northrop Grumman Aerospace Systems (NGAS), will execute the NPP Validation program to ensure the data products comply with the requirements of the sponsoring agencies. Data from the NPP Visible/Infrared Imager/Radiometer Suite (VIIRS) will be used to produce Environmental Data Records (EDR's) for aerosol and clouds, specifically Aerosol Optical Thickness (AOT), Aerosol Particle Size Parameter (APSP), and Suspended Matter (SM); and Cloud Optical Thickness (COT), Cloud Effective Particle Size (CEPS), Cloud Top Temperature (CTT), Height (CTH) and Pressure (CTP), and Cloud Base Height (CBH). The Aerosol and Cloud EDR Validation Program is a multifaceted effort to characterize and validate these data products. The program involves systematic comparison to heritage data products, e.g., MODIS, and ground-based correlative data, such as AERONET and ARM data products, and potentially airborne field measurements. To the extent possible, the domain is global. The program leverages various investments that have and are continuing to be made by national funding agencies in such resources, as well as the operational user community and the broad Earth science user community. This presentation will provide an overview of the approaches, data and schedule for the validation of the NPP VIIRS Aerosol and Cloud environmental data products.

  15. Environmental education and its effect on the knowledge and attitudes of preparatory school students.

    Science.gov (United States)

    Abd El-Salam, Magda M; El-Naggar, Hesham M; Hussein, Rim A

    2009-01-01

    Considering the serious environmental threats facing Egypt, environmental education (EE) that provides the knowledge, skills, and motivation to take individual or collective action is needed to create a sustainable quality of life. This study was carried out aiming at measuring the level of environmental knowledge among preparatory school students in Alexandria, determining their attitudes towards some environmental concepts, and assessing the effect of EE on these knowledge and attitudes. The study sample was selected by stratified random method, and the assessment was conducted using a questionnaire. Results of the study revealed that 77% of the students had poor level of environmental knowledge and that 23% had fair level. In addition, 80% of the students were found to have negative attitude toward the environment and the remainder 20% were indifferent. Such knowledge and attitudes were positively correlated to their socio-economic levels. Following six EE sessions, an improvement in their knowledge and attitudes was observed where 69% of the students had a satisfactory level of knowledge and 88% had positive attitude toward the environment. Attitude was found to be positively correlated to their level of knowledge prior to and following the EE sessions. These results support the need for development and implementation of environmental education programs as part of the regular school curriculum.

  16. Effectiveness of a first-aid intervention program applied by undergraduate nursing students to preparatory school children.

    Science.gov (United States)

    Wafik, Wagida; Tork, Hanan

    2014-03-01

    Childhood injuries constitute a major public health problem worldwide. First aid is an effective life-preservation tool at work, school, home, and in public locations. In this study, the effectiveness of a first-aid program delivered by undergraduate nursing students to preparatory school children was examined. This quasi-experimental study was carried out on 100 school children in governmental preparatory schools in Egypt. The researchers designed a program for first-aid training, and this was implemented by trained nursing students. The evaluation involved immediate post-test and follow-up assessment after two months. The results showed generally low levels of satisfactory knowledge and inadequate situational practice among the school students before the intervention. Statistically-significant improvements were shown at the post- and follow-up tests. Multivariate regression analysis identified the intervention and the type of school as the independent predictors of the change in students' knowledge score, while the intervention and the knowledge score were the predictors of the practice score. The study concluded that a first-aid training program delivered by nursing students to preparatory school children is effective in improving their knowledge and practice. © 2013 Wiley Publishing Asia Pty Ltd.

  17. Commission 31: Time

    Science.gov (United States)

    Matsakis, Demetrios; Defraigne, Pascale; Hosokawa, M.; Leschiutta, S.; Petit, G.; Zhai, Z.-C.

    2007-03-01

    The most intensely discussed and controversial issue in time keeping has been the proposal before the International Telecommunications Union (ITU) to redefine Coordinated Universal Time (UTC) so as to replace leap seconds by leap hours. Should this proposal be adopted, the practice of inserting leap seconds would cease after a specific date. Should the Earth's rotation continue to de-accelerate at its historical rate, the next discontinuity in UTC would be an hour inserted several centuries from now. Advocates of this proposal cite the need to synchronize satellite and other systems, such as GPS, Galileo, and GLONASS, which did not exist and were not envisioned when the current system was adopted. They note that leap second insertions can be and have been incorrectly implemented or accounted for. Such errors have to date had localized impact, but they could cause serious mishaps involving loss of life. For example, some GPS receivers have been known to fail simply because there was no leap second after a long enough interval, other GPS receivers failed because the leap second information was broadcast more than three months in advance, and some commercial software used for internet time-transfer Network Time Protocol (NTP) could either discard all data received after a leap second or interpret it as a frequency change. The ambiguity associated with the extra second could also disrupt financial accounting and certain forms of encryption. Those opposed to the proposal question the need for a change, and also point out the costs of adjusting to the proposed change and its inconvenience to amateur astronomers and others who rely upon astronomical calculations published in advance. Reports have been circulated that the cost of checking and correcting software to accommodate the new definition of UTC would be many millions of dollars for some systems. In October 2005 American Astronomical Society asked the ITU for a year's time to study the issue. This commission has

  18. Preparatory Body State before Reacting to an Opponent: Short-Term Joint Torque Fluctuation in Real-Time Competitive Sports.

    Science.gov (United States)

    Fujii, Keisuke; Yamashita, Daichi; Kimura, Tetsuya; Isaka, Tadao; Kouzaki, Motoki

    2015-01-01

    In a competitive sport, the outcome of a game is determined by an athlete's relationship with an unpredictable and uncontrolled opponent. We have previously analyzed the preparatory state of ground reaction forces (GRFs) dividing non-weighted and weighted states (i.e., vertical GRFs below and above 120% of body weight, respectively) in a competitive ballgame task and demonstrated that the non-weighted state prevented delay of the defensive step and promoted successful guarding. However, the associated kinetics of lower extremity joints during a competitive sports task remains unknown. The present study aims to investigate the kinetic characteristics of a real-time competitive sport before movement initiation. As a first kinetic study on a competitive sport, we initially compared the successful defensive kinetics with a relatively stable preparatory state and the choice-reaction sidestep as a control movement. Then, we investigated the kinetic cause of the outcome in a 1-on-1 dribble in terms of the preparatory states according to our previous study. The results demonstrated that in successful defensive motions in the non-weighted state guarding trial, the times required for the generation of hip abduction and three extension torques for the hip, knee, and ankle joints were significantly shortened compared with the choice-reaction sidestep, and hip abduction and hip extension torques were produced almost simultaneously. The sport-specific movement kinetics emerges only in a more-realistic interactive experimental setting. A comparison of the outcomes in the 1-on-1 dribble and preparatory GRF states showed that, in the non-weighted state, the defenders guarded successfully in 68.0% of the trials, and the defender's initiation time was earlier than that in the weighted state (39.1%). In terms of kinetics, the root mean squares of the derivative of hip abduction and three extension torques in the non-weighted state were smaller than those in the weighted state

  19. Multimedia Tutorial In Physics For Foreign Students Of the Engineering Faculty Preparatory Department

    Directory of Open Access Journals (Sweden)

    P. G. Matukhin

    2016-05-01

    Full Text Available Foreign students study physics and Russian as a foreign language at the preparatory Department. They are to be trained to study different courses. During only one year the teachers of physics and Russian should help students from Asia, Africa and Latin America to get ready to study in the university. To help students in a short time to learn physical terms, to understand physics by ear, to read and write, teachers are developing the online multimedia tutorial. It is placed on the cloud OneDrive. Tutorial includes the main themes in the Mechanics. They are physical processes and phenomena, units, physical quantities, kinematics, laws of mechanics and others. The Power Point presentation slides contain information on the topics. These slides help students learn to read Russian texts on physics. There are hyperlinks to sound files on slides. Listening to those recordings, students gain the skills of physical texts listening. After each module we placed the test. Students can prepare for it using the simulator. Tests and exercise equipment made in the form of EXCEL spreadsheets. We provide our students the opportunity to view, read and listen, the tutorial files via their own mobile devices. Thus they can study physics in Russian in the classroom, or at home, but in the library, in the Park etc. Also they have access to it when they are not in Russia, and in their native countries. The tutorial presented seems to be considered as the first attempt to develop the online multimedia aimed to assist foreign students to get success in their efforts to study physics in Russian. It helps our students to learn physics in Russian faster and better. Determined are the directions of further development and improvement of the tutorial.

  20. Perception of academic stress among Health Science Preparatory Program students in two Saudi universities.

    Science.gov (United States)

    Alsulami, Saleh; Al Omar, Zaid; Binnwejim, Mohammed S; Alhamdan, Fahad; Aldrees, Amr; Al-Bawardi, Abdulkarim; Alsohim, Meshary; Alhabeeb, Mohammed

    2018-01-01

    The Health Science Preparatory Program (HSPP) is a special program that aims to enhance the educational preparedness of students for participation in a health sciences career. Students spend their first university year in a combined extensive teaching program before they can be assigned to a particular health science specialty. It is thought that students enrolled in a highly competitive environment such as HSPP with a long list of potential stressors, including developmental, academic overload, language barriers and competition, are more disposed to stress and stress-related complications. This study aims to measure the level of academic stress and to determine its risk factors in students enrolled in HSPP-adapted local universities in Saudi Arabia. The study was conducted at two Saudi universities, King Saud University (KSU) and Imam Mohammad ibn Saud Islamic University (IMSU) with competition-based and non-competition-based HSPP learning models, respectively. Both universities adopt the HSPP system. The scale for assessing academic stress (SAAS) was used to assess students' perceived stress. A total of 290 students successfully completed the questionnaire (N=290), with a mean age of 18.66 years. Mean SAAS scores for KSU and IMSU students were 8.37 (SD = 4.641) and 7.97 (SD = 5.104), P =0.480, respectively. Only "satisfaction" and "associated social and health problems" have shown statistically significant correlation with university ( P =0.000 and P =0.049, respectively). This study has found mean SAAS score for two local universities with competition-based versus non-competition-based HSPP learning models. Academic stress correlation with age, gender and universities was discussed, and valuable future work guidance was recommended.

  1. Inefficient preparatory fMRI-BOLD network activations predict working memory dysfunctions in patients with schizophrenia

    Directory of Open Access Journals (Sweden)

    Anja eBaenninger

    2016-03-01

    Full Text Available Patients with schizophrenia show abnormal dynamics and structure of temporally coherent networks (TCNs assessed using fMRI, which undergo adaptive shifts in preparation for a cognitively demanding task. During working memory (WM tasks, patients with schizophrenia show persistent deficits in TCNs as well as EEG indices of WM. Studying their temporal relationship during WM tasks might provide novel insights into WM performance deficits seen in schizophrenia.Simultaneous EEG-fMRI data were acquired during the performance of a verbal Sternberg WM task with two load levels (load 2 & load 5 in 17 patients with schizophrenia and 17 matched healthy controls. Using covariance mapping, we investigated the relationship of the activity in the TCNs before the memoranda were encoded and EEG spectral power during the retention interval. We assessed four TCNs – default mode network (DMN, dorsal attention network (dAN, left and right working memory networks (WMNs – and three EEG bands – theta, alpha, and beta.In healthy controls, there was a load dependent inverse relation between DMN and frontal-midline theta power and an anti-correlation between DMN and dAN. Both effects were not significantly detectable in patients. In addition, healthy controls showed a left-lateralized load-dependent recruitment of the WMNs. Activation of the WMNs was bilateral in patients, suggesting more resources were recruited for successful performance on the WM task.Our findings support the notion of schizophrenia patients showing deviations in their neurophysiological responses before the retention of relevant information in a verbal WM task. Thus, treatment strategies as neurofeedback targeting pre-states could be beneficial as task performance relies on the preparatory state of the brain.

  2. Histological staining methods preparatory to laser capture microdissection significantly affect the integrity of the cellular RNA

    Directory of Open Access Journals (Sweden)

    Li Ming-Chung

    2006-04-01

    Full Text Available Abstract Background Gene expression profiling by microarray analysis of cells enriched by laser capture microdissection (LCM faces several technical challenges. Frozen sections yield higher quality RNA than paraffin-imbedded sections, but even with frozen sections, the staining methods used for histological identification of cells of interest could still damage the mRNA in the cells. To study the contribution of staining methods to degradation of results from gene expression profiling of LCM samples, we subjected pellets of the mouse plasma cell tumor cell line TEPC 1165 to direct RNA extraction and to parallel frozen sectioning for LCM and subsequent RNA extraction. We used microarray hybridization analysis to compare gene expression profiles of RNA from cell pellets with gene expression profiles of RNA from frozen sections that had been stained with hematoxylin and eosin (H&E, Nissl Stain (NS, and for immunofluorescence (IF as well as with the plasma cell-revealing methyl green pyronin (MGP stain. All RNAs were amplified with two rounds of T7-based in vitro transcription and analyzed by two-color expression analysis on 10-K cDNA microarrays. Results The MGP-stained samples showed the least introduction of mRNA loss, followed by H&E and immunofluorescence. Nissl staining was significantly more detrimental to gene expression profiles, presumably owing to an aqueous step in which RNA may have been damaged by endogenous or exogenous RNAases. Conclusion RNA damage can occur during the staining steps preparatory to laser capture microdissection, with the consequence of loss of representation of certain genes in microarray hybridization analysis. Inclusion of RNAase inhibitor in aqueous staining solutions appears to be important in protecting RNA from loss of gene transcripts.

  3. Histological staining methods preparatory to laser capture microdissection significantly affect the integrity of the cellular RNA.

    Science.gov (United States)

    Wang, Hongyang; Owens, James D; Shih, Joanna H; Li, Ming-Chung; Bonner, Robert F; Mushinski, J Frederic

    2006-04-27

    Gene expression profiling by microarray analysis of cells enriched by laser capture microdissection (LCM) faces several technical challenges. Frozen sections yield higher quality RNA than paraffin-imbedded sections, but even with frozen sections, the staining methods used for histological identification of cells of interest could still damage the mRNA in the cells. To study the contribution of staining methods to degradation of results from gene expression profiling of LCM samples, we subjected pellets of the mouse plasma cell tumor cell line TEPC 1165 to direct RNA extraction and to parallel frozen sectioning for LCM and subsequent RNA extraction. We used microarray hybridization analysis to compare gene expression profiles of RNA from cell pellets with gene expression profiles of RNA from frozen sections that had been stained with hematoxylin and eosin (H&E), Nissl Stain (NS), and for immunofluorescence (IF) as well as with the plasma cell-revealing methyl green pyronin (MGP) stain. All RNAs were amplified with two rounds of T7-based in vitro transcription and analyzed by two-color expression analysis on 10-K cDNA microarrays. The MGP-stained samples showed the least introduction of mRNA loss, followed by H&E and immunofluorescence. Nissl staining was significantly more detrimental to gene expression profiles, presumably owing to an aqueous step in which RNA may have been damaged by endogenous or exogenous RNAases. RNA damage can occur during the staining steps preparatory to laser capture microdissection, with the consequence of loss of representation of certain genes in microarray hybridization analysis. Inclusion of RNAase inhibitor in aqueous staining solutions appears to be important in protecting RNA from loss of gene transcripts.

  4. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  5. The NPOESS Preparatory Project Science Data Segment (SDS) Data Depository and Distribution Element (SD3E) System Architecture

    Science.gov (United States)

    Ho, Evelyn L.; Schweiss, Robert J.

    2008-01-01

    The National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP) Science Data Segment (SDS) will make daily data requests for approximately six terabytes of NPP science products for each of its six environmental assessment elements from the operational data providers. As a result, issues associated with duplicate data requests, data transfers of large volumes of diverse products, and data transfer failures raised concerns with respect to the network traffic and bandwidth consumption. The NPP SDS Data Depository and Distribution Element (SD3E) was developed to provide a mechanism for efficient data exchange, alleviate duplicate network traffic, and reduce operational costs.

  6. NASA's NPOESS Preparatory Project Science Data Segment: A Framework for Measurement-based Earth Science Data Systems

    Science.gov (United States)

    Schwaller, Mathew R.; Schweiss, Robert J.

    2007-01-01

    The NPOESS Preparatory Project (NPP) Science Data Segment (SDS) provides a framework for the future of NASA s distributed Earth science data systems. The NPP SDS performs research and data product assessment while using a fully distributed architecture. The components of this architecture are organized around key environmental data disciplines: land, ocean, ozone, atmospheric sounding, and atmospheric composition. The SDS thus establishes a set of concepts and a working prototypes. This paper describes the framework used by the NPP Project as it enabled Measurement-Based Earth Science Data Systems for the assessment of NPP products.

  7. Perception of academic stress among Health Science Preparatory Program students in two Saudi universities

    Directory of Open Access Journals (Sweden)

    Alsulami S

    2018-03-01

    Full Text Available Saleh Alsulami, Zaid Al Omar, Mohammed S Binnwejim, Fahad Alhamdan, Amr Aldrees, Abdulkarim Al-bawardi, Meshary Alsohim, Mohammed Alhabeeb Departments of Family Medicine and Medical Education, College of Medicine, Imam Mohammad ibn Saud Islamic University, Riyadh, Saudi Arabia Abstract: The Health Science Preparatory Program (HSPP is a special program that aims to enhance the educational preparedness of students for participation in a health sciences career. Students spend their first university year in a combined extensive teaching program before they can be assigned to a particular health science specialty. It is thought that students enrolled in a highly competitive environment such as HSPP with a long list of potential stressors, including developmental, academic overload, language barriers and competition, are more disposed to stress and stress-related complications. This study aims to measure the level of academic stress and to determine its risk factors in students enrolled in HSPP-adapted local universities in Saudi Arabia. The study was conducted at two Saudi universities, King Saud University (KSU and Imam Mohammad ibn Saud Islamic University (IMSU with competition-based and non-competition-based HSPP learning models, respectively. Both universities adopt the HSPP system. The scale for assessing academic stress (SAAS was used to assess students’ perceived stress. A total of 290 students successfully completed the questionnaire (N=290, with a mean age of 18.66 years. Mean SAAS scores for KSU and IMSU students were 8.37 (SD = 4.641 and 7.97 (SD = 5.104, P=0.480, respectively. Only “satisfaction” and “associated social and health problems” have shown statistically significant correlation with university (P=0.000 and P=0.049, respectively. This study has found mean SAAS score for two local universities with competition-based versus non-competition-based HSPP learning models. Academic stress correlation with age, gender and

  8. Improvement of radioactivity inventory evaluation procedure in preparatory tasks for decommissioning

    International Nuclear Information System (INIS)

    Tanaka, Ken-ichi; Ichige, Hideaki; Tanabe, Hidenori

    2011-01-01

    Preparatory tasks for decommissioning of nuclear power plant start with radiological characterization. Residual radioactivity inventory evaluation is a main part of the characterization. Reliable information on the inventory is important for specification for decommissioning plan. Japan Atomic Power Company (JAPC) has already started these tasks for Tsuruga Nuclear Power Plant Unit 1 (TS-1). We can optimize decommissioning plan using the information. To obtain the reliable information, we improved an evaluation procedure. The procedure is divided into two main steps. First step is neutron flux distribution calculation and second one is radioactivity distribution calculation. Radioactivity distribution is calculated using neutron flux distribution. In this work, we improved the evaluation procedure to obtain the reliable information on the inventory. Because of the limitation of computer resource, two-dimension (2D) approximation model was applied to radioactivity distribution around Reactor Pressure Vessel (RPV). We can calculate reliable 2D neutron flux distribution by having better understanding of neutron transport phenomena. Neutron flux was measured at 30 locations in TS-1 Primary Containment Vessel (PCV) using activation foils. And in order to understand the neutron transport phenomenon inside the PCV, we also calculated neutron flux distribution with the three-dimensional (3D) discrete ordinates method calculation (Sn) code. By consideration about the result of the measurement and 3D calculation, we could understand the characteristics of the neutron flux distribution inside the PCV. To simulate the neutron flux distribution well with 2D Sn code, neutron flux behaviors inside the PCV had been investigated with referencing the measurement values and with observing calculated 3D neutron flux distribution. 2D calculation model had been modified repeatedly until reliable calculation result was provided. After several model modifications, the reliable 2D

  9. National Capital Planning Commission Meeting Transcripts

    Data.gov (United States)

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  10. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  11. Commission Conditions d'emploi

    CERN Multimedia

    Staff Association

    2017-01-01

    Au CERN, nous avons la formidable possibilité d’imaginer nos CONDITIONS D’EMPLOIS. Rendez-vous compte ! Nous avons le pouvoir de proposer des idées et de les défendre pour avoir des conditions d’emplois qui soient les plus attractives possibles pour le personnel en place et à venir. ---------------- L’Association du personnel du CERN, tout le monde connait ou en a entendu parler. Ce qui est moins connu, ce sont les diverses commissions internes qui traitent des sujets propres à défendre les intérêts du personnel. Les publications dans notre journal, l’Echo, sont un des moyens à notre disposition pour vous faire découvrir chacune des commissions internes de l’Association du personnel (voir Echo n°242 sur la commission juridique, et Echo n°255 sur la commission des cas particuliers). Commission Conditions d&...

  12. National Bioethics Commissions as Educators.

    Science.gov (United States)

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  13. Follow-up study of the preparatory study for Ecodesign and Energy Label for Household Dishwashers

    OpenAIRE

    BOYANO LARRIBA ALICIA; MOONS HANS; VILLANUEVA KRZYZANIAK ALEJANDRO; GRAULICH KATHRIN; RÜDINAUER INA; ALBORZI FARNAZ; HOOK INA; STAMMINGER RAINER

    2017-01-01

    Starting in 2014, the Commission has undertaken a review study of the household dishwashers regulations (Ecodesing regulation and Energy Label regulation). The conclusions of this study are updated in this report and will be presented to stakeholders at the meeting of the Consultation Forum established under Article 18 of the Ecodesign Directive 2009/125/EC, to be held 22th November 2017. In addition, this report includes new forecast scenarios at the light of the release of the Energy Labell...

  14. Commissioning of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(CDS)2069446

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focusing on simultaneous running and combined track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  15. Surrogacy commissioning fathers and HIV

    OpenAIRE

    Jordaan, D W

    2014-01-01

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have b...

  16. 47 CFR 1.1528 - Commission review.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528... Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on its own initiative, in...

  17. LHC Commissioning and First Operation

    OpenAIRE

    Myers, S

    2010-01-01

    A description is given of the repair of the LHC after the accident of September 2008. The LHC hardware and beam commissioning and initial operation are reviewed both in terms of beam and hardware performance. The implemented machine protection measures and their impact on LHC operation are presented.

  18. Commissioning Leibstadt nuclear power plant

    International Nuclear Information System (INIS)

    Roeder, A.; Degen, R.; Nedelko, U.

    1985-01-01

    This paper describes the experience and benefits obtained from the use of temporary oil fired boilers of sufficient capacity to allow commissioning and no-load tests to be carried out on the turbine-generator months ahead of steam being available from the NSSS. The successful result at Leibstadt may be a model for other plants

  19. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  20. The Effectiveness of Using the 7E's Learning Cycle Strategy on the Immediate and Delayed Mathematics Achievement and the Longitudinal Impact of Learning among Preparatory Year Students at King Saud University (KSU)

    Science.gov (United States)

    Khashan, Khaled

    2016-01-01

    This study aimed to investigate the effectiveness of teaching Mathematics by using 7E's Learning Cycle strategy in immediate and delayed achievement and retention among Preparatory Year students at King Saud University (KSU)--Saudi Arabia, in comparison with the traditional method. The study sample consisted of (73) Preparatory Year students at…

  1. Nausea and vomiting after exposure to non-ionic contrast media: incidence and risk factors focusing on preparatory fasting.

    Science.gov (United States)

    Kim, Yeon Soo; Yoon, Soon Ho; Choi, Young Hun; Park, Chang Min; Lee, Whal; Goo, Jin Mo

    2018-04-25

    To prospectively evaluate the incidence of nausea and vomiting after exposure to non-ionic iodinated contrast media (ICM), and to identify potential risk factors, with a focus on fasting duration for solid food and fluids, separately. From January to March 2017, 1175 patients (605 males, 570 females; median age, 60 years; range, 20-91 years) undergoing ICM-enhanced CT were included in this study. Patients received instructions for a 6 h preparatory fast from solid food. Nausea and vomiting after ICM exposure were assessed on a 3-point scale (mild, moderate, severe). Patients' characteristics and the fasting duration were evaluated to identify risk factors using logistic regression analysis. Of the 1175 patients, 34 (2.9%; 95% CI, 2.0-4.0%) experienced mild nausea. No patients experienced vomiting (95% CI, 0.0000-0.0005%). 1173 (99.8%) carried out a 6 h fast, and the median fasting durations were 14 h for solid food (IQR, 12.5-15.5 h) and 11 h for fluid (IQR, 0-13.5 h), respectively. Fasting durations for solid food and fluids were not associated with nausea on uni-variate regression analyses (p = 0.282-1.000 andP=0.146-1.000, respectively). Multi-variate regression analysis revealed that a history of drug hypersensitivity (OR = 4.33; 95% CI, 1.85-17.52; p = .039) was independent risk factors for nausea, whereas iobitridol was less nauseous (OR = 0.32; 95% CI, 0.11-0.90; p = .032). Mild nausea occurred in 2.9% of patients and none vomited in our study population with a 6 h preparatory fast from solid food. Many patients underwent excessive fasting for fluids as well as solid food and their fasting durations were not associated with nausea. Advances in knowledge: We firstly evaluated fasting durations for solid food and fluids, and their impacts on vomiting or nausea after ICM exposure with an instruction of 6 h preparatory fast for solid food: many patients underwent excessive fasting for fluids and the fasting duration was unrelated to

  2. LHC: Construction and Commissioning Status

    CERN Document Server

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  3. Guidance on future art commissioning.

    Science.gov (United States)

    2009-05-01

    Delegates at Building Better Healthcare's recent "National Patient Environment and the Arts Conference 2009" in London heard how national public arts think tank ixia has appointed Bristol-based arts and wellbeing development agency Willis Newson to write "concise and convincing guidance" on commissioning art for new healthcare facilities. A key message, during a joint presentation, was that integrating artwork into hospitals and other healthcare premises requires the earliest possible consideration to reap the maximum rewards.

  4. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    The major progress made during the last months has been in the consolidation of services for the +endcaps and three barrel wheels (YB+2, YB+1 and YB0): all subdetectors have now final power connections (including Detector Safety protection), the gas systems have been commissioned for all gas detectors (the recirculation is not yet activated for the RPC though) and detector cooling has also been commissioned. Their integration with final services is the necessary condition for being able to operate larger fractions the detector. Recent weeks have seen full HCAL, more than 50% of EB and full wheels of DTs and CSC being operated using final services. This has not yet translated into major progress of global integration due to major interruptions of central services, which have not allowed the necessary debugging and commissioning time to all the subdetec¬tors and central activities like DAQ and trigger. Moreover the running in of the final central services has introduced instabilities related to the co...

  5. Report of the disarmament commission

    International Nuclear Information System (INIS)

    1991-07-01

    At its forty-fifth session, the General Assembly adopted resolution 45/62 B of 4 December 1990, entitled ''Report of the Disarmament Commission'', by which the Assembly, inter alia: notes that no consensus could be reached on specific recommendations for the item regarding various aspects of the arms race, particularly the nuclear-arms race and nuclear disarmament, as well as a general approach to negotiations on nuclear and conventional disarmament; Working Group II on agenda item 5 of the United Nations Disarmament Commission, entitled ''Process of nuclear disarmament in the framework of international peace and security, with the objective of the elimination of nuclear weapons'', held 11 meetings during the 1991 substantive session of the Disarmament Commission which were preceded by a number of rounds of informal consultations conducted by the Chairman. A structure of work which would serve as a guideline for the work of the Group, while at the same time maintaining the general nature of the desired approach was agreed to by the Group; it included the following four items: 1. The relationship between the process of nuclear disarmament and international peace and security; 2. Review of the steps taken in the process of nuclear disarmament; 3. Strengthening the process of nuclear disarmament, necessary conditions, and mechanisms required for it; 4. The role of the United Nations system in the process of nuclear disarmament with the objective of the elimination of nuclear weapons

  6. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    P5 Commissioning activities The commissioning effort at the pit has made major progress since the last CMS week concerning the installation and operation of the off-detector electronics in USC. The progress has been much slower in the experi¬mental cavern due to the delay in the deployment of the infrastructure which should eventually allow safe powering-up of the front ends. Nevertheless, temporary power connections have allowed operation of slices of subdetectors at any given time. HF, HE, ECAL, DTs, RPCs and CSCs have carried out local commissioning tests with these temporary services. The status of hardware deployment in USC and on the towers/balconies is represented in the detailed table below.   Table 1: Status of installation of off-detector electronics. FEDs are detector dependent hardware modules which perform the first ‘colla¬tion’ of front-end data and send it to Central-data for event building. Tracker, ECAL, HCAL have their front end electronics mo...

  7. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The global commissioning campaign begins this year with a series of weekly two-day global runs of limited participation until mid-March. The aim of these runs varies week-to-week, but includes the commissioning the calorimeter triggers, the muon track-finder triggers in the DT/CSC overlap, the PLL locking ranges, and generally accumulating data either for HCAL noise characterization or detector studies with cosmic muons. In mid-March a full Global Run is scheduled with all components participating, followed in April by a Cosmic Run with the aim of collecting statistics over a couple weeks with the installed Tracker and other subsystems. The ultimate milestone is the Cosmic Run At Four Tesla (CRAFT), with a completed CMS closed and the solenoid energized for data-taking during June. The Detector Performance Groups start the year with the focus to prepare for LHC collisions, and the associated challenges (CSA08) and global commissioning exercises (CRAFT) along the way. New this year is the addition of the Tri...

  8. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  9. Preparatory training attenuates drastic response of the insulin-like growth factor binding protein 1 at the point of maximal oxygen consumption in handball players

    Directory of Open Access Journals (Sweden)

    Olgica Nedić

    2017-09-01

    Conclusion: The inverse relation between insulin and IGFBP-1 was lost during MPET, as these 2 molecules changed in the same direction. The results obtained suggest less severe stress-induced depression of insulin and IGFBP-1 after preparatory training. But another metabolic mechanism cannot be excluded, and that is potentially impaired insulin sensitivity resulting in higher level of IGFBP-1.

  10. Historical recipes for preparatory layers for oil paintings in manuals, manuscripts and handbooks in North West Europe, 1550-1900: analysis and reconstructions

    NARCIS (Netherlands)

    Stols-Witlox, M.J.N.

    2014-01-01

    Grounds, or preparatory layers, form the basis of nearly all artistic oil paintings. They influence both a painting’s visual characteristics and its longevity. This thesis investigates a collection of c. 700 historical recipes for ground preparation and c. 300 related quotes from historical sources.

  11. Preparatory behaviours and condom use during receptive and insertive anal sex among male-to-female transgenders (Waria) in Jakarta, Indonesia

    NARCIS (Netherlands)

    Prabawanti, Ciptasari; Dijkstra, Arie; Riono, Pandu; Tb, Gagan Hartana

    2014-01-01

    Introduction: The male-to-female transgender (waria) is part of a key population at higher risk for HIV. This study aims to test whether psychosocial determinants as defined by the theory of planned behaviour (TPB) can explain behaviours related to condom use among waria. Three preparatory

  12. ListeningTime; participatory development of a web-based preparatory communication tool for elderly cancer patients and their healthcare providers.

    NARCIS (Netherlands)

    Noordman, J.; Driesenaar, J.A.; Bruinessen, I.R. van; Dulmen, S. van

    2017-01-01

    Objective: This paper outlines the participatory development process of a web-based preparatory communication tool for elderly cancer patients and their oncological healthcare providers (HCPs). This tool aims to support them to (better) prepare their encounters. An overarching aim of the project is

  13. Contributions of the SDR Task Network tool to Calibration and Validation of the NPOESS Preparatory Project instruments

    Science.gov (United States)

    Feeley, J.; Zajic, J.; Metcalf, A.; Baucom, T.

    2009-12-01

    The National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP) Calibration and Validation (Cal/Val) team is planning post-launch activities to calibrate the NPP sensors and validate Sensor Data Records (SDRs). The IPO has developed a web-based data collection and visualization tool in order to effectively collect, coordinate, and manage the calibration and validation tasks for the OMPS, ATMS, CrIS, and VIIRS instruments. This tool is accessible to the multi-institutional Cal/Val teams consisting of the Prime Contractor and Government Cal/Val leads along with the NASA NPP Mission team, and is used for mission planning and identification/resolution of conflicts between sensor activities. Visualization techniques aid in displaying task dependencies, including prerequisites and exit criteria, allowing for the identification of a critical path. This presentation will highlight how the information is collected, displayed, and used to coordinate the diverse instrument calibration/validation teams.

  14. Definition of a focus of reading and writing teaching in the process from preparatory to primary level at school

    Directory of Open Access Journals (Sweden)

    Rudy Doria Correa

    2014-08-01

    Full Text Available This paper shows the results of a research exercise in order to define an approach of reading and writing’s teaching and learning in the process from preparatory to primary education in Asodesi’s school in the city of Monteria - Córdoba. This experience is a part of the investigation “classroom projects: an experience of action research in language teaching at school”, theoretically oriented from the study of various approaches about teaching reading and writing early, with a qualitative methodology (IA, by forming a study group work (SGW, within which teachers reflect on their teaching practices, in order to improve and transform them. The main results are: the definition of a comprehensive approach of teaching reading and writing, linked to the goals of training offered in classroom projects in primary and secondary levels and the development of skills incomprehension and textual production. 

  15. Preparatory selection of sterilization regime for canned Natural Atlantic Mackerel with oil based on developed mathematical models of the process

    Directory of Open Access Journals (Sweden)

    Maslov A. A.

    2016-12-01

    Full Text Available Definition of preparatory parameters for sterilization regime of canned "Natural Atlantic Mackerel with Oil" is the aim of current study. PRSC software developed at the department of automation and computer engineering is used for preparatory selection. To determine the parameters of process model, in laboratory autoclave AVK-30M the pre-trial process of sterilization and cooling in water with backpressure of canned "Natural Atlantic Mackerel with Oil" in can N 3 has been performed. Gathering information about the temperature in the autoclave sterilization chamber and the can with product has been carried out using Ellab TrackSense PRO loggers. Due to the obtained information three transfer functions for the product model have been identified: in the least heated area of autoclave, the average heated and the most heated. In PRSC programme temporary temperature dependences in the sterilization chamber have been built using this information. The model of sterilization process of canned "Natural Atlantic Mackerel with Oil" has been received after the pre-trial process. Then in the automatic mode the sterilization regime of canned "Natural Atlantic Mackerel with Oil" has been selected using the value of actual effect close to normative sterilizing effect (5.9 conditional minutes. Furthermore, in this study step-mode sterilization of canned "Natural Atlantic Mackerel with Oil" has been selected. Utilization of step-mode sterilization with the maximum temperature equal to 125 °C in the sterilization chamber allows reduce process duration by 10 %. However, the application of this regime in practice requires additional research. Using the described approach based on the developed mathematical models of the process allows receive optimal step and variable canned food sterilization regimes with high energy efficiency and product quality.

  16. Alaska Public Offices Commission, Department of Administration, State of

    Science.gov (United States)

    Visiting Alaska State Employees State of Alaska Department of Administration Alaska Public Offices Commission Alaska Department of Administration, Alaska Public Offices Commission APOC Home Commission Filer ; AO's Contact Us Administration > Alaska Public Offices Commission Alaska Public Offices Commission

  17. National Capital Planning Commission Library contents

    Data.gov (United States)

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  18. Powers and Duties of Corporate Affairs Commission

    African Journals Online (AJOL)

    Mofasony

    POWERS AND DUTIES OF THE CORPORATE AFFAIRS. COMMISSION ... The Registrar-General is the Chief Executive of the Commission and is saddled .... Federal Board of Inland Revenue Department of the Ministry of Finance v). Register ...

  19. Atomic Energy Commission Act, 2000 (Act 588)

    International Nuclear Information System (INIS)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  20. Bioethics commission to review gene patenting

    Energy Technology Data Exchange (ETDEWEB)

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  1. The Industry Commission inquiry into charitable organisations.

    Science.gov (United States)

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  2. Atomic Energy Commission (Amendment) Law, 1993

    International Nuclear Information System (INIS)

    1993-02-01

    The Atomic Energy Commission (Amendment) Law, 1993 (P.N.D.C.L. 308) seeks to amend the Atomic Energy Commission Act of 1963 (Act 204) so as to provide for the establishment of a Radiation Protection Board and other institutes under the Ghana Atomic Energy Commission. The Law further repeats the Atomic Energy Commission (Amendment) Law of 1982 (P.N.D.C.L. 37). (EAA)

  3. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  4. Commissioning Instrument for the GTC

    Science.gov (United States)

    Cuevas, S.; Sánchez, B.; Bringas, V.; Espejo, C.; Flores, R.; Chapa, O.; Lara, G.; Chavolla, A.; Anguiano, G.; Arciniega, S.; Dorantes, A.; González, J. L.; Montoya, J. M.; Toral, R.; Hernández, H.; Nava, R.; Devaney, N.; Castro, J.; Cavaller-Marqués, L.

    2005-12-01

    During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes: imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. This instrument was built by the Instituto de Astronomía UNAM and the Centro de Ingeniería y Desarrollo Industrial (CIDESI) under GRANTECAN contract after a public bid. In this paper we made a general instrument overview and we show some of the performance final results obtained when the Factory Acceptance tests previous to its transport to La Palma.

  5. 17 CFR 201.57 - Commission review.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  6. Commissioning of the CEBAF cryomodules

    International Nuclear Information System (INIS)

    Drury, M.; Lee, T.; Marshall, J.; Preble, J.; Saulter, Q.; Schneider, W.; Spata, M.; Wiseman, M.

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, over half of the cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz. A cryomodule must provide an energy gain of 20 MeV to the 200 μA beam. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's of the cavity ports, the unloaded Q (Q 0 ) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity. The sensitivity of the resonant frequency to changes in pressure and gradient is also measured. Finally, the mechanical tuners are cycled and characterized. In all cases, the performance of CEBAF cryomodules has exceeded the design requirements. A portable test stand allows local control of the rf system and provides automated data acquisition. This paper describes the cryomodule commissioning hardware, software, and measurements

  7. Boot cAMP: educational outcomes after 4 successive years of preparatory simulation-based training at onset of internship.

    Science.gov (United States)

    Fernandez, Gladys L; Page, David W; Coe, Nicholas P; Lee, Patrick C; Patterson, Lisa A; Skylizard, Loki; St Louis, Myron; Amaral, Marisa H; Wait, Richard B; Seymour, Neal E

    2012-01-01

    Preparatory training for new trainees beginning residency has been used by a variety of programs across the country. To improve the clinical orientation process for our new postgraduate year (PGY)-1 residents, we developed an intensive preparatory training curriculum inclusive of cognitive and procedural skills, training activities considered essential for early PGY-1 clinical management. We define our surgical PGY-1 Boot Camp as preparatory simulation-based training implemented at the onset of internship for introduction of skills necessary for basic surgical patient problem assessment and management. This orientation process includes exposure to simulated patient care encounters and technical skills training essential to new resident education. We report educational results of 4 successive years of Boot Camp training. Results were analyzed to determine if performance evidenced at onset of training was predictive of later educational outcomes. Learners were PGY-1 residents, in both categorical and preliminary positions, at our medium-sized surgical residency program. Over a 4-year period, from July 2007 to July 2010, all 30 PGY-1 residents starting surgical residency at our institution underwent specific preparatory didactic and skills training over a 9-week period. This consisted of mandatory weekly 1-hour and 3-hour sessions in the Simulation Center, representing a 4-fold increase in time in simulation laboratory training compared with the remainder of the year. Training occurred in 8 procedural skills areas (instrument use, knot-tying, suturing, laparoscopic skills, airway management, cardiopulmonary resuscitation, central venous catheter, and chest tube insertion) and in simulated patient care (shock, surgical emergencies, and respiratory, cardiac, and trauma management) using a variety of high- and low-tech simulation platforms. Faculty and senior residents served as instructors. All educational activities were structured to include preparatory materials

  8. Molr - A delegation framework for accelerator commissioning

    CERN Document Server

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  9. SERPUKHOV: UNK transfer beamline commissioned

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    At the end of the 1000 hour February-March run of the 70 GeV proton synchrotron at the Institute for High Energy Physics (IHEP), Serpukhov, near Moscow, the new 2.7-kilometre UNK Beam Transfer Line (BTL) was commissioned with proton beam. BTL will eventually transfer beam from the existing U70 proton accelerator to the first stage of the UNK (UNK-1, now under construction) where it will be accelerated in the 21- kilometre ring up to 600 GeV. BTL was designed for proton energies between 60 and 70 GeV, momentum spread ± 2 x 10 -3 and beam emittance 2 mm.mrad, with systems for fast ejection, beam transfer and injection into UNK-1

  10. Commissioning and operation of DRAGON

    International Nuclear Information System (INIS)

    Engel, Sabine

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the 21 Na(p,γ) 22 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of ±20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented

  11. Commissioning and operation of DRAGON

    CERN Document Server

    Engel, S

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the sup 2 sup 1 Na(p,gamma) sup 2 sup 2 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of +-20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented.

  12. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    T. Camporesi

    The central commissioning activities have concentrated mostly in the Service cavern. Since early February the central DAQ has been ready to accept connections from FEDs from the various partitions. This has triggered a campaign from all subdetectors to install their readout crates in USC55. Systematic tests of the connections between FEDs and Central DAQ have been scheduled and to date more than 70% of all FED connections have been successfully tested from almost all subdetectors. In March the Level 1 trigger team started deployment of their hardware followed by a campaign of testing the connections between Trigger primitive generators and the corresponding LV1 hardware (Regional Calorimeter Trigger and Global Muon Trigger). The functionality tests are continuing to date by pattern tests of increasing complexity. In April the central DAQ was ready to start FED system tests, which amounts to testing the data reading and trans¬fer-ability from the FEDs to the Filter Units (with or without an actual ...

  13. Division A Commission 31: Time

    Science.gov (United States)

    Hosokawa, Mizuhiko; Arias, Elisa Felicitas; Manchester, Richard; Tuckey, Philip; Matsakis, Demetrios; Zhang, Shougang; Zharov, Vladimir

    2016-04-01

    Time is an essential element of fundamental astronomy. In recent years there have been many time-related issues, in scientific and technological aspects as well as in conventions and definitions. At the Commission 31 (Time) business meeting at the XXIX General Assembly, recent progress and many topics, including Pulsar Time Scales WG and Future UTC WG activities, were reviewed and discussed. In this report, we will review the progress of these topics in the past three years. There are many remarkable topics, such as Time scales, Atomic clock development, Time transfer, Future UTC and future redefinition of the second. Among them, scientific highlights are the progress of pulsar time scales and the optical frequency standards. On the other hand, as the social convention, change in the definition of UTC and the second is important.

  14. Substance use and associated factors among preparatory school students in Bale Zone, Oromia Regional State, Southeast Ethiopia.

    Science.gov (United States)

    Dida, Nagasa; Kassa, Yibeltal; Sirak, Teshome; Zerga, Ephrem; Dessalegn, Tariku

    2014-08-09

    The use of cigarettes, alcohol, khat, and other substances is a worldwide threat which especially affects young people and which is also common among the youth of Ethiopia. However, its prevalence and associated factors have not been addressed well yet. Thus, this study aimed to assess the prevalence and associated factors of substance use among preparatory school students in Bale Zone, Oromia Regional State, Southeast Ethiopia. An institutional-based cross-sectional study was conducted among 603 randomly selected students from five of eight preparatory schools of Bale Zone, Oromia Regional State, Southeast Ethiopia, in March 2013. The sample size was calculated by a single population proportion formula and allocated proportionally for the schools based on the number of students. A pretested structured questionnaire was used to collect the data. The data were analyzed using SPSS version 16.0. Descriptive, bivariate, and multivariate logistic regressions were employed to identify the predictors of substance use. The overall current prevalence of substance use among the respondents was 34.8% (210). Specifically, 23.6% (102) and 4.6% (28) of the respondents chewed khat and smoked cigarette, respectively. Sex, age, and substance use status of the respondents' father, mother, siblings, and best friend had an association with substance use. Male respondents were about ten times more at risk of practicing substance use compared to female respondents [adjusted odds ratio (AOR) 11.37, 95% confidence interval (CI) 4.42-29.23]. Respondents whose sibling(s) smokes cigarette were four times more likely to use substance (AOR 4.44, 95% CI 1.11-17.79). Respondents whose best friend chews khat were 11 times more likely to use substance when compared with those whose best friend does not practice the given factor (AOR 11.15, 95% CI 4.43-28.07). Respondents whose family uses one or more substances were more likely use substance(s). Respondents whose best friend uses substance(s) were

  15. PatientVOICE: Development of a Preparatory, Pre-Chemotherapy Online Communication Tool for Older Patients With Cancer.

    Science.gov (United States)

    van Dulmen, Sandra; Driesenaar, Jeanine A; van Weert, Julia Cm; van Osch, Mara; Noordman, Janneke

    2017-05-10

    Good communication around cancer treatment is essential in helping patients cope with their disease and related care, especially when this information is tailored to one's needs. Despite its importance, communication is often complex, in particular in older patients (aged 65 years or older). In addition to the age-related deterioration in information and memory processing older patients experience, communication is also complicated by their required yet often unmet role of being an active, participatory patient. Older patients rarely express their informational needs and their contributions to consultations are often limited. Therefore, older patients with cancer need to be prepared to participate more actively in their care and treatment. The objective of this paper was to report the development of PatientVOICE, an online, preparatory tool with audio facility aimed to enhance the participation of older patients during educational nursing encounters preceding chemotherapy and to improve their information recall. PatientVOICE was developed by applying the following 6 steps of the intervention mapping framework that involved both patients and nurses: (1) needs assessment, (2) specifying determinants and change objectives, (3) reviewing and selecting theoretical methods and practical strategies, (4) developing intervention components, (5) designing adoption and implementation, and (6) making an evaluation plan. A careful execution of these consecutive steps resulted in the ready-to-use preparatory website. PatientVOICE provides pre-visit information about chemotherapy (ie, medical information, side effects, and recommendations of dealing with side effects), information about the educational nursing visit preceding chemotherapy (ie, aim, structure, and recommendations for preparation), techniques to improve patients' communication skills using a question prompt sheet (QPS) and video-modeling examples showing "best practices", and the opportunity to upload and listen

  16. The Commissioning of the LHC Technical Systems

    CERN Document Server

    Saban, R; Baggiolini, V; Ballarino, A; Barbero-Soto, E; Bellesia, B; Bordry, Frederick; Bozzini, D; Casas-Lino, M-P; Chareyre, V; Claudet, S; Coelingh, G-J; Dahlerup-Petersen, K; Denz, R; Fehér, S; Flora, R; Gruwé, M; Kain, V; Kirby, G; Koratzinos, M; Lauckner, R; Le Naour, S; Mess, K-H; Millet, F; Montabonnet, V; Nisbet, D; Perea-Solano, B; Pojer, M; Principe, R; Rabehl, R; Rijllart, A; Redaelli, S; Rodríguez-Mateos, F; Schmidt, R; Serio, L; Siemko, A; Solfaroli-Camillocci, M; Thiesen, H; Venturini, W; Vergara-Fernandez, A; Verweij, A; Zerlauth, M

    2007-01-01

    The LHC is an accelerator with unprecedented complexity where the energy stored in magnets and the beams exceeds other accelerators by one-to-two orders of magnitude. To ensure a safe and efficient machine start-up without being plagued by technical problems, a phase of "hardware commissioning" was introduced: a thorough commissioning of technical systems without beam. This activity started in June 2005 with the commissioning of individual systems, followed by operating a full sector, one eighth of the machine; the commissioning is expected to last until spring 2008 when commissioning with beam will start. The LHC architecture allows the commissioning of each of the eight sectors independently from the others, before the installation of other sectors is complete. An important effort went into the definition of the programme and the organization of the coordination in the field, as well as in the preparation of the tools to record and analyze test results. This paper discusses the experience with this approach...

  17. Travel report on a preparatory mission to the Institute of Radiotherapy and Oncology Skopje, Republic of Macedonia

    International Nuclear Information System (INIS)

    Neubauer, J.

    2001-07-01

    A preparatory mission to Skopje / Republic of Macedonia was carried out by a contract to the International Atomic Energy Agency (IAEA). The intention of the mission was to find out the needs for a radium conditioning project required by Macedonia. Such a conditioning project is offered by the IAEA to member states in order to improve safety to spent radium sources. It was suspected by Macedonian authorities that radium sources formerly used in the state hospital in Skopje might be leaking, in this way creating a safety problem to persons working in that area. The finding of the mission yielded no immediate risk in this respect but following the IAEA safety program the conditioning of the radium sources should be carried out. A wall safe was used in the hospital for storing all sources. The inventory was not quite clear, but the position for the radium sources was known. It could be clarified that the radium sources are not leaking and that no contamination was present at the room accommodating the safe. Since only a few radium sources are present in this hospital and no further sources of that kind are to be known in Macedonia only one capsule would be necessary for their enclosure. A proper place within the hospital could be identified for interim storage of the conditioned sources placed in a 200 I drum with lead and concrete shielding. Agreement on how to move forward with radium conditioning project was reached. The objectives of the travel were fully met. (author)

  18. The cognitive roles of behavioral variability: idiosyncratic acts as the foundation of identity and as transitional, preparatory, and confirmatory phases.

    Science.gov (United States)

    Eilam, David

    2015-02-01

    Behavior in obsessive compulsive disorder (OCD), in habitual daily tasks, and in sport and cultural rituals is deconstructed into elemental acts and categorized into common acts, performed by all individuals completing a similar task, and idiosyncratic acts, not performed by all individuals. Never skipped, common acts establish the pragmatic part of motor tasks. Repetitive performance of a few common acts renders rituals a rigid form, whereby common acts may serve as memes for cultural transmission. While idiosyncratic acts are not pragmatically necessary for task completion, they fulfill important cognitive roles. They form a long preparatory phase in tasks that involve high stakes, and a long confirmatory phase in OCD rituals. Idiosyncratic acts also form transitional phases between motor tasks, and are involved in establishing identity and preserving the flexibility necessary for adapting to varying circumstances. Behavioral variability, as manifested in idiosyncrasy, thus does not seem to be a noise or by-product of motor activity, but an essential cognitive component that has been preserved in the evolution of behavioral patterns, similar to the genetic variability in biology. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Nuclear Regulatory Commission issuances, October 1993

    International Nuclear Information System (INIS)

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  20. Large Hadron Collider commissioning and first operation.

    Science.gov (United States)

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  1. A Staged Approach to LHC Commissioning

    CERN Document Server

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  2. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  3. Federal Energy Regulatory Commission (FERC) Regions

    Data.gov (United States)

    Department of Homeland Security — Federal Energy Regulatory Commission (FERC) Regions. FERC is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil....

  4. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  5. Real Estate Agent Commission Disputes

    Directory of Open Access Journals (Sweden)

    Anida Duarte

    2015-06-01

    Full Text Available The purpose of this study was to examine the relationship among Procuring Cause Law, real estate agent years of experience, and real estate commission disputes. A pilot survey was conducted in the southwestern United States among real estate agents, realtor(s, and brokers. After testing the hypothesis, the decision was made to fail to reject the hypothesis and conclude that real estate agent experience and not Procuring Cause Law produced favorable outcomes in disputes. As a result, the following recommendations were made: (a Agency seller and buyer’s agreements should be used in each transaction to avoid disputes, (b proper expectations and guidelines should be reviewed prior to starting any real estate transaction, (c a checklist may assist in the assurance that all valuable information is reviewed, (d agents could benefit from fully understanding Procuring Cause Law and sharing this information with their clients, (e state and national regulatory requirements of the law could be modified for easier understanding and use, and (f consumers who willfully violate the law could be subject to monetary penalties.

  6. 77 FR 67637 - Equity and Excellence Commission

    Science.gov (United States)

    2012-11-13

    ... notice also describes the functions of the Commission. Notice of this meeting is required by section 10(a.... ADDRESSES: The Commission will meet in Washington, DC at the National Museum of the American Indian at... Lounge of the museum on November 27 and in the museum's fourth-floor conference room on November 28. FOR...

  7. Commissioning quality assurance at Pickering NGS

    International Nuclear Information System (INIS)

    Wieckowski, J.T.

    1983-05-01

    Ontario Hydro decided in 1978 to implement a formal quality assurance program applicable to commissioning and operation of nuclear generating stations. Pickering NGS is the first station to have the commissioning quality assurance (CQA) program applied to it. This paper outlines the scope, implementation, and evaluation of the CQA program as applied to Pickering Unit 5

  8. 76 FR 4369 - Special Law Enforcement Commissions

    Science.gov (United States)

    2011-01-25

    ...This notice announces the online publication of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the Office of Justice Services following passage of the Tribal Law and Order Act of 2010. The documents are published on the Indian Affairs Web site.

  9. Ghana Atomic Energy Commission: Annual Report 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute.

  10. The Lancet Commission on Syria | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The journal has adopted a series of global commissions that convene groups of experts for a limited time to produce thematic work aimed at improving human lives through scientific review and inquiry, and to encourage accountability for the problem under study. The Commission on Syria marks the first time a Southern ...

  11. Ghana Atomic Energy Commission: Annual Report 2001

    International Nuclear Information System (INIS)

    2002-01-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute

  12. Niger Delta Development Commission and Sustainable ...

    African Journals Online (AJOL)

    Niger Delta Development Commission and Sustainable Development of Niger Delta Region of Nigeria: The Case of Rivers State. Goddey Wilson. Abstract. The study is on Niger Delta Development Commission and sustainable development of Niger Delta region of Nigeria, the case of Rivers State. The main objective of the ...

  13. Commissioning MMS: Challenges and Lessons Learned

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  14. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  15. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  16. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    Tiziano Camporesi

    Pit commissioning activities The last 4 months have seen various major achievements in hardware commissioning, global data taking, readiness of the DPGs to deal with LHC data flows and alignment and calibration workflows. Since February, the global commissioning has been characterized on the one side by more and more of the final CMS detector becoming available for global readout and triggering and on the other side by consolidation of many of the central software infrastructure and of most of the services infrastructure. The reliability of services like cooling, power, gas has markedly improved with respect to what we observed in the second half of 2007.   Of particular note are the delivery of all low voltage power supplies, the commissioning of the final power distribution, the progressive commissioning ( still ongoing)  of the Detector Safety System and of the associated DCS early warning and alarm system. On the detector side, while already we are used to seeing all of HCAL being exe...

  17. Preparatory Work for a Scenario-Based Electricity Expansion Plan for North Korea after Hypothetical Reunification using WASP-IV

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo; Chang, Choong Koo [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    It is noteworthy that North Korean government itself has demanded other parties' cooperation in the field of power sector as the top priority to deal with North Korean own economic issues. In this light, the researcher consider that how to build power capacity in North Korean area after reunification needs to be studied with priority. A scenario-based approach is being adopted, and three scenarios are proposed: Scenario increasing capacity at 2.4% annual rate, Imitating South Korean electricity expansion history, and reaching 80% of South Korean Annual Peak Load in 35 years. In order to carry out the research, WASP-IV (Wien Automation System Planning-IV) code developed by IAEA is, with reasonable assumptions, being executed. Annual Peak Load prediction for each scenario, load duration curve, and existing power generating facilities in North Korea are presented herein. This research is being conducted as a preparatory work for the further study. IAEA's WASP-IV is adopted for a scenario-based electricity expansion plan for North Korea after hypothetical reunification between Koreas. Input data including Annual Peak Load, load duration curve, and existing facilities are built and presented. Additional future research includes inputting candidate plants data, cost data such as construction period, operation and maintenance costs, and fuel costs, as well as decommissioning of aged power plants in North Korea to complete WASP-IV execution. Assuming reunification, electricity expansion plan would need to integrate North and South Koreas demands and facilities. However, this research narrows down its scope to North Korean demand and facilities only. Such integrated simulation could be the topic for the later research. This work was supported by the 2014 Research Fund of the KINGS.

  18. Influence of Preparatory Workshops on Dental Students' Academic Performance and Stress on Their First Operative Dentistry Psychomotor Exam.

    Science.gov (United States)

    Dilbone, Deborah A; Feng, Xiaoying; Su, Yu; Xirau-Probert, Patricia; Behar-Horenstein, Linda S; Nascimento, Marcelle M

    2018-06-01

    Predoctoral dental psychomotor examinations are known to generate high levels of stress among dental students, which may compromise their academic performance. At one U.S. dental school, all 93 first-year dental students were invited to attend a series of three workshop sessions prior to enrollment in their initial operative dentistry course. The workshops were developed to facilitate academic transition from the dental anatomy course to the operative dentistry course; provide early exposure to materials, instruments, and laboratory techniques; support the early development of psychomotor and self-assessment skills; and lessen students' stress and anxiety levels regarding psychomotor examinations. The aim of this study was to assess the impact of the workshops on the students' academic performance and self-reported stress and preparedness. All students who attended the workshop sessions and all who did not were asked to complete a pre-exam survey (immediately preceding the exam) and a post-exam survey (immediately after the exam) on the day of their first operative dentistry psychomotor exam. Of the 93 students, 21 attended one, 34 attended two, and 25 attended three workshop sessions, while 13 students did not attend any. Response rates for the pre- and post-exam surveys were 100% and 98.9%, respectively. Students who attended all three workshop sessions reported being significantly less stressed about taking the exam than the other groups. The mean exam grade of students who attended the workshop sessions was significantly higher than that of students who did not attend the sessions. These findings support the development and implementation of preparatory workshops to improve academic performance and decrease the stress levels of dental students prior to the first operative dentistry psychomotor exam.

  19. Training Load, Physical Performance, Biochemical Markers, and Psychological Stress During A Short Preparatory Period in Brazilian Elite Male Volleyball Players.

    Science.gov (United States)

    Horta, Thiago A G; Bara Filho, Maurício G; Coimbra, Danilo R; Miranda, R; Werneck, Francisco Z

    2017-12-11

    The aim of this study was to assess the relationship between training load (TL) and physical performance, biochemical markers, and psychological stress during a short preparatory period (PP) in Brazilian elite male volleyball players. Twelve volleyball players from a team competing in the Brazilian Men's Volleyball Super League were enrolled (26.9 ± 4.6 years). Countermovement Jump (CMJ), Creatine Kinase (CK), Testosterone (T), Cortisol (Cr), T/Cr ratio, and Recovery and Stress Questionnaire for Athletes (RESTQ-Sport) were collected at baseline, after 2, 4, and 6 week. TL was quantified daily using the Rating of Perceived Exertion (RPE). Differences were noted between Total Weekly TL (TWTL) (F3,33 = 50.907; p = 0.0001), CK (F3,33 = 16.157; p = 0.0001), and T (F3,33 = 3.283; p = 0.03). No differences were seen in CMJ (F3,33 = 1.821; p = 0.16), Cr (F3,33 = 2.409; p = 0.08), or T/Cr ratio (F3,33 = 1.527; p = 0.23). The RESTQ-Sport demonstrated differences between moments in Social Stress (F3,33 = 2.297; p = 0.04; Eta = 0.25), Success (F3,33 = 4.350; p = 0.01; Eta = 0.19), General Well-being (F3,33 = 4.465; p = 0.01; Eta = 0.36), and Injury (F3,33 = 2.792; p = 0.05; Eta = 0.62). The results showed a significant correlations of small to moderate magnitude between TWTL and CK (r = 0.32; p = 0.05). In conclusion, a short PP in volleyball leads to increased TL, CK level, and psychological stress. TL was related with the increase of CK, suggesting muscle damage without increased of physical performance.

  20. Preparatory Work for a Scenario-Based Electricity Expansion Plan for North Korea after Hypothetical Reunification using WASP-IV

    International Nuclear Information System (INIS)

    Kim, Young Joo; Chang, Choong Koo

    2014-01-01

    It is noteworthy that North Korean government itself has demanded other parties' cooperation in the field of power sector as the top priority to deal with North Korean own economic issues. In this light, the researcher consider that how to build power capacity in North Korean area after reunification needs to be studied with priority. A scenario-based approach is being adopted, and three scenarios are proposed: Scenario increasing capacity at 2.4% annual rate, Imitating South Korean electricity expansion history, and reaching 80% of South Korean Annual Peak Load in 35 years. In order to carry out the research, WASP-IV (Wien Automation System Planning-IV) code developed by IAEA is, with reasonable assumptions, being executed. Annual Peak Load prediction for each scenario, load duration curve, and existing power generating facilities in North Korea are presented herein. This research is being conducted as a preparatory work for the further study. IAEA's WASP-IV is adopted for a scenario-based electricity expansion plan for North Korea after hypothetical reunification between Koreas. Input data including Annual Peak Load, load duration curve, and existing facilities are built and presented. Additional future research includes inputting candidate plants data, cost data such as construction period, operation and maintenance costs, and fuel costs, as well as decommissioning of aged power plants in North Korea to complete WASP-IV execution. Assuming reunification, electricity expansion plan would need to integrate North and South Koreas demands and facilities. However, this research narrows down its scope to North Korean demand and facilities only. Such integrated simulation could be the topic for the later research. This work was supported by the 2014 Research Fund of the KINGS

  1. Instrumented home energy rating and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  2. The Kemeny commission report. Comments by UKAEA

    International Nuclear Information System (INIS)

    1979-01-01

    The report of the President's Commission - the Kemeny Report - on the accident at Three Mile island has been considered by the UKAEA and the implications of the Commission's findings and recommendations for the United Kingdom examined. The contents of the report have been studied not only generally but also for each site and especially with respect to plant instrumentation, operator training, emergency arrangements and communications. The Authority believes that there are no major deficiencies but is fully aware of the crucial importance of continuing to exercise all possible care and ensuring that each detailed point arising from the Kemeny Commission's Report is given careful thought. (U.K.)

  3. Commissioning quality assurance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig.

  4. Commissioning quality assurance for nuclear power plants

    International Nuclear Information System (INIS)

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig

  5. Official communication of the Safety Commission

    CERN Multimedia

    DG Unit

    2009-01-01

    The Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of 2 April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  6. Official communication of the Safety Commission

    CERN Multimedia

    DG Unit

    2009-01-01

    We, the Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of the 2nd April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  7. Nuclear Regulatory Commission: more aggressive leadership needed

    International Nuclear Information System (INIS)

    Staats, E.B.

    1980-01-01

    The Energy Reorganization Act of 1974 which established the Nuclear Regulatory Commission required GAO to evaluate the Commission's performance by January 18, 1980. This report responds to that requirement. GAO concluded that, although improvements have been made, the Commission's nuclear regulatory performance can be characterized best as slow, indecisive, cautious - in a word, complacent. This has largely resulted from a lack of aggressive leadership as evidenced by the Commissioners' failure to establish regulatory goals, control policymaking, and most importantly, clearly define their roles in nuclear regulation

  8. Permanent Commission for Health and Safety

    CERN Multimedia

    Association du personnel

    2007-01-01

    The mandate of the Staff Association's permanent commission for Health and Safety is to examine all aspects of health and safety related to the working environment at CERN. In no way does it wish to be a substitute for the official bodies that are responsible for these matters. The Commission's aim is to formulate remarks on and make proposals about these questions to the relevant bodies and the CERN Management. Its main focus is the safety of the CERN staff but it is also concerned with the safety of the installations and of the CERN environment. The Commission reports to the Staff Council and the Executive Committee of the Staff Association.

  9. Nuclear Regulatory Commission issuances, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Defense (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, May 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Impact of National Universities Commission (NUC) Accreditation ...

    African Journals Online (AJOL)

    Nekky Umera

    (NUC) accreditation exercise on university administrative structure of four selected Nigerian ... The Commission's recommendations led to the setting up by Government the National ... For instance, the goals of tertiary education as spelt out in ...

  12. Commissioning (Phases 4, 4A, 4B)

    National Research Council Canada - National Science Library

    Schofield, Andrew

    1997-01-01

    Phase 4 marked the completion of ANS&A's commitments under the BAA, as the new large centrifuge at the Waterways Experiment Station was commissioned and a series of research experiments were undertaken to demonstrate the breadth of new...

  13. Compressor Load Stand: Commissioning and Control Strategies

    National Research Council Canada - National Science Library

    Causey, Andrew

    1998-01-01

    .... The purpose of this research project was to commission this load stand, which includes setting up the hardware, setting up a control system, a data acquisition system, and an automatic test sequence system...

  14. The commissioning of nuclear power plants

    International Nuclear Information System (INIS)

    1989-09-01

    The objectives and requirements to be met in commissioning nuclear power plants are presented. The objective of commissioning is to ensure that each component, subsystem, system, or structure in a plant will be capable of fulfilling its design requirements throughout its design life. The requirements for commissioning are: the preparation of a detailed, comprehensive, documented program to demonstrate that all components, systems and structures relevant to safety meet design intent; documented evidence that safety systems are fully operable and can meet design requirements; and, appropriate documentation of the actual state or behaviour of all components, systems and structures relevant to safety. All systems must be included in the commissioning program. Whenever possible, full safety system test should be performed. If a full system in situ test is not possible, alternative means are suggested. (8 refs.)

  15. Nuclear Regulatory Commission issuances, July 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, June 1992

    International Nuclear Information System (INIS)

    1992-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, April 1994

    International Nuclear Information System (INIS)

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission Issuances, November 1980

    International Nuclear Information System (INIS)

    1980-11-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  19. Nuclear Regulatory Commission issuances, December 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, December 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, December 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, September 1992

    International Nuclear Information System (INIS)

    1992-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, February 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances, March 1993

    International Nuclear Information System (INIS)

    1993-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances, July 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, August 1992

    International Nuclear Information System (INIS)

    1992-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. arXiv Medical Physics Commissioning

    CERN Document Server

    Meer, David

    The medical commissioning is an important step to bring a particle gantry into clinical operation for tumour treatments. This involves the parametrization and characterization of all relevant systems including the beam delivery, the patient table, the imaging systems and the connection to all required software components. This article is limited to necessary tasks for the beam delivery system of a pencil beam scanning system. Usually the commissioning starts with the characterization of the unscanned beam and the calibration of the beam energy. The following steps are the parametrization of the scanning system, the commissioning of the beam position monitoring system and characterization of the spot size, all requiring precisions better than 1 mm. The commissioning effort for these tasks depends also on the gantry topology. Finally, the calibration of the dose measurement system ensures that any dose distribution can be delivered with an absolute precision better than 1%.

  8. Nuclear Regulatory Commission issuances, May 1982

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission, the Atomic Safety and Licensing Appeal Boards, the Atomic Safety and Licensing Boards, the Administrative Law Judge, the Directors' Decision, and the Denials of Petitions for Rulemaking

  9. Commissioning the Linac Coherent Light Source injector

    Directory of Open Access Journals (Sweden)

    R. Akre

    2008-03-01

    Full Text Available The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL project presently under construction at SLAC [J. Arthur et al., SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  10. Nuclear Regulatory Commission Issuances, December 1980

    International Nuclear Information System (INIS)

    1980-12-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  11. Nuclear Regulatory Commission issuances, August 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Alaska State Commission for Human Rights

    Science.gov (United States)

    Harassment Poster Filing a Complaint with the Commission Public Hearing Cases Accusations Decisions Public . vs. Anchorage Plumbing and Heating Vilma Anderson vs. Anchorage School District Robin Block vs. Pulse

  13. LHC injection optics measurements at commissioning (2015)

    CERN Document Server

    Garcia-Tabares Valdivieso, Ana; Coello De Portugal - Martinez Vazquez, Jaime Maria; Garcia-Bonilla, Alba-Carolina; Langner, Andy Sven; Maclean, Ewen Hamish; Malina, Lukas; Mcateer, Meghan Jill; Persson, Tobias Hakan Bjorn; Skowronski, Piotr Krzysztof; Tomas Garcia, Rogelio; CERN. Geneva. ATS Department

    2016-01-01

    This report describes the measurement and correction process followed during the 2015 LHC injection optics commissioning which extended into Machine Developments (MDs). Results have been analyzed and compared to the 2012 measurements.

  14. Nuclear Regulatory Commission issuances, February 1993

    International Nuclear Information System (INIS)

    1993-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, November 1992

    International Nuclear Information System (INIS)

    1992-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, April 1993

    International Nuclear Information System (INIS)

    1993-04-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Online Learning of Commission Avoidant Portfolio Ensembles

    OpenAIRE

    Uziel, Guy; El-Yaniv, Ran

    2016-01-01

    We present a novel online ensemble learning strategy for portfolio selection. The new strategy controls and exploits any set of commission-oblivious portfolio selection algorithms. The strategy handles transaction costs using a novel commission avoidance mechanism. We prove a logarithmic regret bound for our strategy with respect to optimal mixtures of the base algorithms. Numerical examples validate the viability of our method and show significant improvement over the state-of-the-art.

  18. The LHC from commissioning to operation

    CERN Document Server

    Lamont, M

    2011-01-01

    In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulating 1 fb-1 by the end of the year. The progress from commissioning to operation is described. Emphasis is put on the beam performance, but also on the performance of the different hardware systems. The role of collimation and machine protection is discussed, in view of the very high stored beam and magnet energy.

  19. [Specific features of the functional state of the cardiorespiratory system in athletes differing in the types of muscular activity during the preparatory period of the training cycle].

    Science.gov (United States)

    Ivanova, N B

    2011-01-01

    The present study of the functional state of the cadiorespiratory system included athletes engaged in cyclic team sports. The state of the cardiorespiratory system was estimated from the measurement of central hemodynamics and cardiac rhythm variability, results of electrocardiography, spirography, and pneumotachography performed during the preparatory period for the training cycle. It was shown that the cardiovascular and respiratory systems as well as vegetative regulation of the cardiac rhythm of the athletes under examination underwent differently directed structural modification depending on the specific patterns of muscular activity.

  20. Alberta Petroleum Marketing Commission annual report, 1993

    International Nuclear Information System (INIS)

    1994-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1993 marked the last full year of the Commission operating as Alberta's representative in the energy regulatory arena in Canada and the USA; due to restructuring, these functions will be transferred to the Ministry of Energy in early 1994. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 40.2 million bbl, down 11% from 1992, and receipts of heavy crude were 3.7 million bbl, down 42% from 1992. Revenue from crude oil sales was $800 million, down 25% from 1992. The Commission's natural gas activities in 1993 included price determination and information collection. 4 figs., 3 tabs

  1. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  2. 75 FR 81244 - Military Leadership Diversity Commission Meeting

    Science.gov (United States)

    2010-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission Meeting... will take place: 1. Name of Committee: Military Leadership Diversity Commission (MLDC). 2. Date... Military Leadership Diversity Commission to continue their efforts to address congressional concerns as...

  3. 75 FR 2114 - Military Leadership Diversity Commission (MLDC); Meeting

    Science.gov (United States)

    2010-01-14

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission (MLDC....150, the Department of Defense announces that the Military Leadership Diversity Commission (MLDC) will... commissioners of the Military Leadership Diversity Commission to continue their efforts to address congressional...

  4. Commissioning of the LHC Cryogenic System Subsystems Cold Commissioning in Preparation of Full Sector Tests

    CERN Document Server

    Serio, L; Ferlin, G; Gilbert, N; Gruehagen, Henning; Knoops, S; Parente, C; Sanmartí, M

    2006-01-01

    The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.

  5. Alberta Petroleum Marketing Commission annual report, 1992

    International Nuclear Information System (INIS)

    1993-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1992 marked the end of chronically depressed natural gas prices and a significant reduction in natural gas surpluses. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, unchanged from 1991, and receipts of heavy crude were 6.3 million bbl, up 4% from 1991. Revenue from crude oil sales was $1.1 billion, down from $1.64 billion in 1991. The Commission's natural gas activities in 1992 included price determination and information collection. 9 figs., 1 tab

  6. Alberta Petroleum Marketing Commission annual report, 1991

    International Nuclear Information System (INIS)

    1992-04-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. In 1991, the middle east crisis caused prices to spike at the commencement of the Gulf war, but these quickly stabilized. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, down 1.5% from 1990, and receipts of heavy crude were 6.1 million bbl, up 5% from 1990. Revenue from crude oil sales was $1,642,244,000, down from $2,078,197,000 in 1990. Loss of the Montreal market through pipeline closure led to increased pressure on prices, particularly on heavy crudes. The Commission's natural gas activities in 1991 included price determination and information collection. 9 figs., 1 tab

  7. The NRU blowdown test facility commissioning program

    Energy Technology Data Exchange (ETDEWEB)

    Walsworth, J A; Zanatta, R J; Yamazaki, A R; Semeniuk, D D; Wong, W; Dickson, L W; Ferris, C E; Burton, D H [Atomic Energy of Canada Ltd., Chalk River, ON (Canada). Chalk River Nuclear Labs.

    1990-12-31

    A major experimental program has been established at the Chalk River Nuclear Laboratories (CRL) that will provide essential data on the thermal and mechanical behaviour of nuclear fuel under abnormal reactor operating conditions and on the transient release, transport and deposition of fission product activity from severely degraded fuel. A number of severe fuel damage (SFD) experiments will be conducted within the Blowdown Test Facility (BTF) at CRL. A series of experiments are being conducted to commission this new facility prior to the SFD program. This paper describes the features and the commissioning program for the BTF. A development and testing program is described for critical components used on the reactor test section. In-reactor commissioning with a fuel assembly simulator commenced in 1989 June and preliminary results are given. The paper also outlines plans for future all-effects, in-reactor tests of CANDU-designed fuel. (author). 11 refs., 3 tabs., 7 figs.

  8. VINCI: the VLT Interferometer commissioning instrument

    Science.gov (United States)

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  9. Commissioning of the Ground Test Accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H - injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2βγ Drift Tube Linac (DTL-1) module, the 8.7 MeV 2βγ DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations

  10. Commissioning of the ground test accelerator RFQ

    International Nuclear Information System (INIS)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Garnott, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohsen, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Sandoval, D.P.; Saadatmand, K.; Stevens, R.R.Jr.; Vaughn, G.; Wadlinger, E.A.; Yuan, V.; Connolly, R.; Weiss, R.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on line. The commissioning stages are the 35-keV H - injector, the 2.5-MeV radio-frequency quadrupole (RFQ), the intertank matching section (IMS), the 3.2-MeV first 2-βλ drift tube linac (DTL-1) module, the 8.7-MeV 2-βλDTL (modules 1-5), and the 24-MeV GTA (all 10 DTL modules). Commissioning results from the RFQ beam experiments are presented along with comparisons with simulations. (Author) 8 refs., 9 figs

  11. Yale and the Atomic Bomb Casualty Commission

    International Nuclear Information System (INIS)

    Bowers, J.Z.

    1983-01-01

    This is a description, based largely on personal discussions, of the contributions of men from the Yale University School of Medicine to the saga of the immediate and long-term studies on the medical effects of the atomic bombs at Hiroshima and Nagasaki. They played key roles in the immediate studies of bomb effects, in the creation of long-term studies of delayed effects, and in elevating the Atomic Bomb Casualty Commission after 1955 to a position of excellence in its studies and relations with the Japanese. The accumulation of the information presented in this paper derives from research for the preparation of the history of the Atomic Bomb Casualty Commission. In 1975, the commission was passed to Japanese leadership as the Radiation Effects Research Foundation

  12. Law of the Energy Regulatory Commission

    International Nuclear Information System (INIS)

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  13. The NPOESS Preparatory Project (NPP) Science Data Segment (SDS) Data Depository and Distribution Element (SD3E) System Architecture

    Science.gov (United States)

    Ho, Evelyn L.; Schweiss, Robert J.

    2008-01-01

    The National Polar-orbiting Operational Environmental Satellite System (NPOESS), the U.S. Government's future low-Earth orbiting satellite system, will monitor global weather and environmental conditions. Serving as a risk reduction for NPOESS, the NPOESS Preparatory Project (NPP) will provide remotely sensed atmospheric, land, ocean, ozone, and sounder data that will serve the meteorological and global climate change scientific communities. The National Aeronautics and Space Administration (NASA) NPP Science Data Segment's (SDS) primary role is to independently assess the quality of the NPP science and environmental data records for their ability to support climate research. The SDS is composed of nine elements; an input element that receives data from the operational agencies and acts as a buffer, a calibration analysis element, five elements devoted to measurement based quality assessment, an element used to test algorithmic improvements, and an element that provides overall science direction. Each element requires a set of sensor specific science data products for their evaluation. There are four NPP sensors that will be flown on the NPP observatory. They are the Visible Infrared Imagining Radiometer Suite (VIIRS), the Advanced Technology Microwave Sounder (ATMS), the Cross-Track Infrared Sounder (CrIS), and the Ozone Mapper/Profiler Suite (OMPS). It is estimated that these four sensors combined will make daily data requests for approximately six terabytes of NPP science products from the operational data providers. As a result, issues associated with duplicate data requests, data transfers of large volumes of diverse products, and data transfer failures raised concerns with respect to the network traffic and bandwidth consumption. Therefore, a central data broker system for receiving and buffering data requests and data products for the SDS was developed. The data element for this system is called the SDS Data Depository and Distribution Element (SD3E). It

  14. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  15. European commission research activities on iodine

    International Nuclear Information System (INIS)

    Loggia, E. della

    1996-01-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs

  16. European commission research activities on iodine

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, E della [European Commission, Brussels (Belgium)

    1996-12-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs.

  17. Commissioning of the ATLAS Liquid Argon Calorimeters

    CERN Document Server

    Cooke, M; The ATLAS collaboration

    2009-01-01

    Since the first modules of the ATLAS LAr calorimeters were read out in situ in 2006, commissioning studies have been performed. These studies include the testing of the electronics calibration system, surveys for dead or problematic channels, investigations of the quality of the physics pulse shape prediction , and tests of energy and time reconstruction with cosmic or single beam induced signals. The results of these commissioning studies indicate the LAr calorimeters are prepared for LHC collisions and positioned to meet the physics objectives of the ATLAS experiment.

  18. 1992 Nuclear Regulatory Commission Annual Report

    International Nuclear Information System (INIS)

    1993-01-01

    This is the 18th annual report of the US Nuclear Regulatory Commission (NRC), covering events and activities occurring in fiscal year 1992 (the year ending September 30, 1992), with some treatment of events from the last quarter of calendar year 1992. The NRC was created by enactment in the Congress of the Energy Reorganization Act of 1974. It is an independent agency of the Federal Government. The five NRC Commissioners are nominated by the President and confirmed by the United States Senate. The Chairman of the Commission is appointed by the President from among the Commissioners confirmed

  19. Jacques Delors - President de la Commission Europeenne

    Directory of Open Access Journals (Sweden)

    Dacian Graţian GAL

    2005-02-01

    Full Text Available This article refers to the President of the European Commission between 1985- 1995, Jacques Delors. He was the single person who exercised the presidency of the European Commission during 10 years and this period was one of the most important for the European construction: the achievement of the Single Market, the development of the Single Currency Unit project, of the new common politics, the enlargement of the European Union from 12 members to 15 members etc. Due the contribution of his presidency to the European construction, Jacques Delors is one of the parents of the European construction and one of the most important political men of the XX century.  

  20. 45 CFR 702.12 - Contempt of the Commission.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Contempt of the Commission. 702.12 Section 702.12 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS RULES ON HEARINGS, REPORTS, AND MEETINGS OF THE COMMISSION Hearings and Reports § 702.12 Contempt of the Commission...

  1. 29 CFR 2200.92 - Review by the Commission.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION RULES OF PROCEDURE Posthearing Procedures § 2200.92 Review by the Commission. (a) Jurisdiction of the Commission; issues on... Commission to review the entire case. The issues to be decided on review are within the discretion of the...

  2. 19 CFR 213.5 - Access to Commission resources.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in...

  3. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Science.gov (United States)

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  4. 76 FR 31307 - Commission of Fine Arts; Notice of Meeting

    Science.gov (United States)

    2011-05-31

    ... COMMISSION OF FINE ARTS Commission of Fine Arts; Notice of Meeting The next meeting of the U.S. Commission of Fine Arts is scheduled for June 16, 2011, at 10 a.m. in the Commission offices at the National Building Museum,Suite 312, Judiciary Square, 401 F Street, NW., Washington, DC, 20001-2728. Items of...

  5. 18 CFR 388.104 - Informal advice from Commission staff.

    Science.gov (United States)

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  6. 17 CFR 171.28 - Participation by Commission staff.

    Science.gov (United States)

    2010-04-01

    ... staff. 171.28 Section 171.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION..., Membership Denial and Registration Actions § 171.28 Participation by Commission staff. The Division of.... The Commission shall by order establish a supplementary briefing schedule for the Commission staff and...

  7. Nuclear Regulatory Commission issuances, April 1989

    International Nuclear Information System (INIS)

    1989-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, July 1989

    International Nuclear Information System (INIS)

    1989-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, March 1989

    International Nuclear Information System (INIS)

    1989-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Danish Atomic Energy Commission 1974/75

    International Nuclear Information System (INIS)

    1975-11-01

    Activities of the Danish Atomic Energy Commission and the Risoe eesearch Establishment for the period April1, 1974 to March 31, 1975 are summarized. The operations of the various facilities at the Research Establishment are revised. Operating staff levels and financial data are tabulated, a selected list of staff publications is given, and the design data on research facilities are presented. (B.P.)

  11. Nuclear Regulatory Commission issuances, August 1990

    International Nuclear Information System (INIS)

    1990-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. The European Commission as Network Broker

    DEFF Research Database (Denmark)

    Borrás, Susana

    2007-01-01

    after the year 2000. Developing a conceptual framework about brokerage roles in EU policy, the article uses a combination of quantitative and qualitative data in an empirical analysis of two very different cases where the Commission has been embattled the past years. The article argues that previous...

  13. Nuclear Regulatory Commission issuances, December 1989

    International Nuclear Information System (INIS)

    1989-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Ten years after the Jali Commission

    African Journals Online (AJOL)

    Ten years have lapsed since the Jali Commission's final report became publicly available, and it is therefore an .... as the 'core business' of the department. This was seen as .... the 2009/10–2013/14 DCS Strategic Plan did the department ...

  15. Nuclear Regulatory Commission issuances, May 1989

    International Nuclear Information System (INIS)

    1989-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. 76 FR 55424 - CFC-50 Commission

    Science.gov (United States)

    2011-09-07

    ... conclude its work in approximately six months. 11. Termination. March 31, 2012. 12. Membership and... administrators of the campaign, participating charities and watchdog groups. These members will consist of both... Agency's approval, are responsible for directing the work of the Commission, including the creation of...

  17. Philippine Atomic Energy Commission: Annual report 1983

    International Nuclear Information System (INIS)

    1984-01-01

    This publication gives the highlights of the research and development projects of the Philippine Atomic Energy Commission in agriculture and food, nuclear fuels and power system technology, medicine, public health and nutrition, environmental surveillance, supportive basic research, social response to nuclear technology, nuclear licensing and safeguards, supportive technology and international and local linkages including manpower development. (ELC)

  18. Nuclear Regulatory Commission issuances, September 1987

    International Nuclear Information System (INIS)

    1987-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Bundled Discounts and the Antitrust Modernization Commission

    OpenAIRE

    Aaron Panner

    2007-01-01

    The Report of the Antitrust Modernization Commission devotes relatively little space to antitrust common law – the judge-made doctrine that governs unreasonable restraints of trade under Section 1 and monopolization under Section 2 of the Sherman Act.

  20. Nuclear Regulatory Commission issuances, May 1990

    International Nuclear Information System (INIS)

    1990-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, May 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Division B Commission 40: Radio Astronomy

    NARCIS (Netherlands)

    Chapman, Jessica M.; Giovaninni, Gabriele; Taylor, Russell; Carilli, Christopher; Hills, Richard; Hirabayashi, Hisashi; Jonas, Justin L.; Lazio, Joseph; Morganti, Raffaella; Nan, Rendong; Rubio, Monica; Shastri, Prjaval; Kellermann, Ken; Ekers, Ronald; Ohishi, Masatoshi

    2016-01-01

    IAU Commission 40 for Radio Astronomy (hereafter C40) brought together scientists and engineers who carry out observational and theoretical research in radio astronomy and who develop and operate the ground and space-based radio astronomy facilities and instrumentation. As of June 2015, the

  3. Nuclear Regulatory Commission issuances, July 1988

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission Issuances, October 1986

    International Nuclear Information System (INIS)

    1986-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances, February 1989

    International Nuclear Information System (INIS)

    1989-02-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Commissioning of the ATLAS Liquid Argon Calorimeters

    CERN Document Server

    Cooke, Mark S

    2009-01-01

    A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies are presented. These include a coherent noise study, a measurement of the quality of the physics pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

  7. Agency transformation and state public utility commissions

    International Nuclear Information System (INIS)

    Jones, Douglas N.

    2006-01-01

    The demise of public utility commissions has been periodically predicted (sometimes hoped for). In their long history they have been attacked by critics as ineffective, inefficient, expensive, or unnecessary. Further, the demonstrated survivability of the commission concept has often been uncharitably attributed to powerful political constituencies, self-preservation manoeuvrings by commissioners themselves, and inertia. The implications of this article point another way. Commission regulation of public utilities has survived mainly because of continued need for social oversight of these critical industry sectors and the capacity of PUCs strategically to adapt to fundamental changes in their surroundings. Two transformational upheavals are treated here - a challenge of flexibility and responsiveness by the dramatic run-up in costs and prices in the 1970s and challenge to relevance by the policy shift to greater reliance on market competition in the 1990s - and regulation's successful accommodation to them. Viewed this way commission regulation is more in a position of 'second wind' than 'last breath'. (author)

  8. Survey commission of the Manche center

    International Nuclear Information System (INIS)

    2002-01-01

    The subjects discussed during the Survey commission of the storage center of the Manche CSCM, held in october 2001, are presented in this document. They deal with the site survey, the maintenance facilities realized on this installations, the tritium survey in the water and the CSCM operating. (A.L.B.)

  9. Nuclear Regulatory Commission issuances, June 1987

    International Nuclear Information System (INIS)

    1987-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, October 1989

    International Nuclear Information System (INIS)

    1989-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Commissioning for the European XFEL facility

    Science.gov (United States)

    Nölle, D.

    2017-06-01

    The European XFEL is a 4th generation light source based on the Self Amplified Spontaneous Emission (SASE) FreeElectron-Laser concept. It is currently being commissioned in North- Germany. The core installation is a 17.5 GeV superconducting accelerator driving 3 SASE lines with photon energies from 1 to beyond 20 keV range with a maximum of 27.000 pulses per second. The international facility is organized as a limited liability company with shareholders from the contributing countries. DESY has taken over the leadership of the accelerator construction consortium, and will be in charge of the operation of the accelerator complex. The facility was set up with contributions from the 11 shareholder countries, either being hardware systems and/or staff or cash contributions. The construction is almost complete, and the commissioning phase has started by the end of 2015. This contribution will report the status of the accelerator complex with emphasis on the commissioning of the accelerator and an outlook to the commissioning of the SASE 1 FEL line.

  12. Commissioning of the RFQ1 injector

    International Nuclear Information System (INIS)

    Arbique, G.M.; Sheikh, J.Y.; Taylor, T.; Birney, L.F.; Davidson, A.D.; Wills, J.S.C.

    1987-01-01

    The RFQ1 accelerator is being developed at Chalk River to test the limits of the cw RFQ technology. A 50 kV injector has been built and is now being commissioned as the first phase of the program. This paper describes some of the innovative features of the RFQ1 injector and reports on initial operating experience

  13. Nuclear Regulatory Commission issuances, December 1990

    International Nuclear Information System (INIS)

    1990-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, April 1991

    International Nuclear Information System (INIS)

    1991-04-01

    This report includes the issuances received during the specified period (April 1991) from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regualtory Commission Issuances, October 1981

    International Nuclear Information System (INIS)

    1981-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors Denial (DD), and the Denial of Petitions for Rulemaking

  16. Status and commissioning of the CMS experiment

    Science.gov (United States)

    Wulz, C.-E.

    2008-05-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  17. Status and Commissioning of the CMS Experiment

    CERN Document Server

    Wulz, Claudia-Elisabeth

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  18. Status and commissioning of the CMS experiment

    International Nuclear Information System (INIS)

    Wulz, C-E

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented

  19. Nuclear Regulatory Commission issuances, April 1987

    International Nuclear Information System (INIS)

    1987-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission Issuances, August 1986

    International Nuclear Information System (INIS)

    1986-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, November 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission Issuances, March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, November 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances, June 1990

    International Nuclear Information System (INIS)

    1990-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    D. Acosta

    Point 5 commissioning activities Since the last CMS week there has been little global commissioning activities: the first mid week global run aiming to assess the status of the hardware and DAQ software after the winter maintenance and developments has taken place two weeks ago involving all subdetectors but tracker and pixel whose hardware is still being actively worked on. The local commissioning restarted once the cooling became available again the third week of January. Below are detailed the main activities which have taken place so far. DAQ The activity of the central DAQ group during pause of global runs was focused on various items. The commissioning of the 900 new PCs which will be used to run the HLT processes has been almost completed. It is planned to use these PCs in the first global run at the start of March. In addition the location of various server PCs which host essential functionalities to get the private ".cms" network going, has been re-organized to allow to implemen...

  6. 76 FR 63325 - National Indian Gaming Commission

    Science.gov (United States)

    2011-10-12

    ... General Accepted Accounting Principles (GAAP). Many comments stated that if this definition was amended... result in an enforcement action and closure order. 25 CFR 573.6(a)(7). II. Definitions--Net Revenues--management fee The NOI asked whether the Commission should consider whether the definition of net revenues...

  7. Nuclear Regulatory Commission issuances, February 1985

    International Nuclear Information System (INIS)

    1985-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. 76 FR 27034 - Equity and Excellence Commission

    Science.gov (United States)

    2011-05-10

    .... The Commission will also make recommendations for restructuring school finance systems to achieve... educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies could address such disparities. The agenda for the...

  9. 75 FR 48661 - Equity and Excellence Commission

    Science.gov (United States)

    2010-08-11

    .... The Commission will also make recommendations for restructuring school finance systems to achieve... educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies could address such disparities. In order to achieve...

  10. Nuclear Regulatory Commission issuances, November 1990

    International Nuclear Information System (INIS)

    1990-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Securities and Exchange Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...: Alicia Goldin, Division of Trading and Markets, Securities and Exchange Commission, 100 F Street NE... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...

  12. Appalachian Regional Commission: 1982 Annual Report.

    Science.gov (United States)

    Appalachian Regional Commission, Washington, DC.

    Fiscal year 1982 was transitional for the Appalachian Regional Commission (ARC), as it was the last year of the broad economic development program and a year of reduced funding and new limits on programs. In 1981, Congress had requested that ARC prepare a plan for completion of the Appalachian highway system and for a 3 to 5 year ARC finish-up…

  13. Appalachian Regional Commission: 1979 Annual Report.

    Science.gov (United States)

    Appalachian Regional Commission, Washington, DC.

    Narrative text, tables, maps, and photographs present an overview of the Appalachian Regional Commission's (ARC) activities in fiscal year 1979, past achievements, and future goals. Major accomplishments of 1979 include: utilization of the $233 million appropriation for highway construction; approval of over $143 million in ARC funds for 985…

  14. Preparatory catheter-directed thrombolysis together with assisted endovascular angioplasty for the treatment of chronic occlusive arterial disorders of lower extremities

    International Nuclear Information System (INIS)

    Zhang Fuxian; Zhang Changming; Hu Lu; Feng Yaping; Liang Gangzhu; Zhang Huan

    2010-01-01

    Objective: To evaluate the safety and efficacy of preparatory catheter-directed thrombolysis together with assisted endovascular angioplasty in treating chronic occlusive arterial disorders of lower extremities. Methods: From January 2008 to December 2009, preparatory catheter-directed thrombolysis together with assisted endovascular angioplasty was performed in 12 patients with chronic occlusive arterial disorders of lower extremities, including 8 males and 4 females with an average age of 56.3 years (within a range of 38-71 years). All 12 patients had a history of chronic ischemia of lower limb,the mean ill duration was 19.3 months (3-48 months). All patients complained of intermittent claudication with a mean distance of 125 m (50-200 m). Rest pain occurred in 5 patients (42%), toe necrosis was seen in 3 patients (25%) and critically ischemic limb in 4 patients (33%). Ankle-brachial index (ABI) was 0.00 0.65 with a mean of 0.33. In all 12 patients catheter-directed thrombolysis with rt-PA or urokinase was initially carried out, which was followed by endovascular angioplasty (balloon dilatation or stent placement) in two days. The clinical data and the therapeutic results were analyzed. Results: Technical success was achieved in all 12 patients. The mean time of thrombolysis was 48 hours. Of 12 patients, rt-PA was employed in 4 and urokinase in 8. The occluded length of the diseased arteries before the treatment was 60-150 mm, with a mean of 80 mm. After catheter-directed thrombolysis,the occluded length decreased to 10-50 mm (mean of 30 mm). Endovascular angioplasty was successfully completed in all patients after thrombolysis therapy. Postoperative ABI was 0.64-1.0 (mean of 0.86), which was increased by 0.53 when compared to the preoperative figure. During the perioperative period neither complications needed to be surgically treated nor death occurred. All patients were followed up, and the arteries remained open after one year in all cases. Conclusion

  15. Tri-Squared Qualitative and Mixed Methods Analysis of Perceptions of the Effectiveness of the Student Athlete Leadership Academy [SALA]: A Character Development and College Preparatory Program for Young African American Men

    Science.gov (United States)

    Hinton, Harvey; Osler, James E.

    2015-01-01

    This paper outlines the major dimensions and overall effectiveness of the Student Athlete Leadership Academy (or "SALA"). SALA is a character development and college preparatory program designed for middle grade student athletes. The focus of this paper is to provide information about year 1 of SALA. At the same time the paper will…

  16. Integrated Formative Actions (AFIN: results and challenges of preparatory course for admission to higher education at the Federal University of Uberlândia

    Directory of Open Access Journals (Sweden)

    Adevailton Bernardo dos Santos

    2017-12-01

    Full Text Available The Integrated Formative Actions Program (AFIN is part of an extension context of formation and aims to support and assist the entry of high school students in situations of economic vulnerability in higher education and to contribute to the formation of major students through teaching practices. The program has the characteristics of a popular preparatory course and began its activities in the second semester of 2015, with 115 students, and its continuity in 2016 expanded to 367 students, achieving significant results in the goals set. This text aims to describe the results of this Program and analyze it considering other similar initiatives and popular education references. The analysis presents elements of this contribution, but also points to the possibility of improving the action with a view to achieving its objective.

  17. ENSURING RADIATION SAFETY AT THE XXVII WORLD SUMMER UNIVERSIADE IN KAZAN BY ROSPOTREBNADZOR BODIES AND ORGANIZATIONS Communication 1. Ensuring radiation safety at the preparatory phase

    Directory of Open Access Journals (Sweden)

    G. G. Onischenko

    2013-01-01

    Full Text Available After the terrorist attack at theBostonMarathon, Federal and Republican executive bodies took increased security measures during the XXVII World Summer Universiade inKazan. Bodies and Organizations of the Federal Service for Surveillance on Consumer Rights Protection and Human Well-being (Rospotrebnadzor were participants of all preparatory activities and directly provided security of the Student Games inKazan. This report analyzes the experience of providing radiation safety by Rospotrebnadzor experts at the stage of preparation for the Universiade. So far, Rospotrebnadzor organizations had no experience of providing radiation safety of such large-scale events. Analysis of the performed work with account for both positive and negative experiences is especially important in the context of preparations for the safety providing of the Olympic Winter Games inSochiin 2014. 

  18. Curriculum for Commissioning Energy Efficient Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Webster, Lia [Portland Energy Conservation, Inc., OR (United States)

    2012-12-27

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  19. Optimization of the commissioning period of nuclear power plant

    International Nuclear Information System (INIS)

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  20. Commissioning of long subsea pipelines - environmental aspects

    International Nuclear Information System (INIS)

    Falck, C.; Kleppe, T.; Maribu, J.

    1997-01-01

    Discharges to air and sea are inevitable during precommissioning and commissioning of long subsea pipelines. Large quantities of water is pumped through the pipeline during these operations. This water is normally treated with corrosion inhibiting chemicals to minimise internal corrosion of the pipeline. Chemicals like methanol or glycol may be used to prevent hydrate formation, and will normally be discharged to sea during commissioning. In order to minimise the environmental impact of these operations, while maintaining corrosion protection, the Norwegian Statoil has been working for several years along three main routes such as to develop concepts and methods that minimise the discharged volumes, the use of the most environmentally friendly chemicals available, and to monitor and identify the effects of discharges to various marine species. 3 refs., 4 figs

  1. Programme of the Commission for 1978. [Booklet

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    Mr. Jenkins, President of the Commission, first examines the problem of the economy and the level of its unemployment in the Community, resulting in a lack of growth. He than presents the two-fold aim of the Commission--to instigate emergency action to sustain industries that are no longer fully competitive and to promote economic growth to provide employment and prosperity. He then examins the energy and agriculture sectors. Two obligations cited for the Community are: (1) to defend Community interests in the energy field in relation to Third World Countries, and (2) to make clear the connections between energy policy and the general economic strategy. Negotiations are underway for enlargement of the community with applications being considered for Greece, Portugal, and Spain. A memorandum annexed to the address contains additional material on building an integrated economic unit, the European citizen and his environment, Europe in the world, and enlargement of the community. (MCW)

  2. A History of the Atomic Energy Commission

    Science.gov (United States)

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  3. LHC Damper Beam commissioning in 2010

    CERN Document Server

    Höfle, W; Schokker, M; Valuch, D

    2011-01-01

    The LHC transverse dampers were commissioned in 2010 with beam and their use at injection energy of 450 GeV, during the ramp and in collisions at 3.5 TeV for Physics has become part of the standard operations pro- cedure. The system proved important to limit emittance blow-up at injection and to maintain smaller than nominal emittances throughout the accelerating cycle. We describe the commissioning of the system step-by-step as done in 2010 and summarize its performance as achieved for pro- ton as well as ion beams in 2010. Although its principle function is to keep transverse oscillations under control, the system has also been used as an exciter for abort gap clean- ing and tune measurement. The dedicated beam position measurement system with its low noise properties provides additional possibilities for diagnostics.

  4. Activity report 2015 Commission Perspectives du Reseau

    International Nuclear Information System (INIS)

    Ricour, Olivia

    2016-01-01

    This document contains the activity report for 2015 of the Commission Perspectives du Reseau which has been set up by RTE to be the main body for organising a dialogue with all the actors of the energy sector and civil society about challenges and stakes of the electric power system on the medium and on the long term. It describes how this body aims at sharing knowledge and expertise of all stakeholders (publications, European platform for data transparency), at being a place for debating and enriching the understanding of tomorrow's important stakes for the power system (discussion of the issue of greenhouse gas emissions with an analysis of the impact of the CO 2 price signal on emissions by the European electricity system and results of the e-Highway 2050 European project). The road-map of the Commission works for 2016 is provided, as well as a list of members

  5. Nuclear Regulatory Commission issuances, May 1993

    International Nuclear Information System (INIS)

    1993-05-01

    This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors' Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers

  6. Nuclear Regulatory Commission Information Digest 1992 edition

    International Nuclear Information System (INIS)

    Olive, K.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  7. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    A. Ryd and T. Camporesi

    2010-01-01

    Commissioning and Run Coordination activities After the successful conclusion of the LHC pilot run commissioning in 2009 activities at the experiment restarted only late in January due to the cooling and detector maintenance. As usual we got going with weekly exercises used to deploy, debug, and validate improvements in firmware and software. A debriefing workshop aimed at analyzing the operational aspects of the 2009 pilot run was held on Jan. 15, 2009, to define a list of improvements (and relative priorities) to be planned. In the last month, most of the objectives set in the debriefing workshop have been attained. The major achievements/improvements obtained are the following: - Consolidation of the firmware for both readout and trigger for ECAL - Software implementation of procedures for raising the bias voltage of the silicon tracker and pixel driven by LHC mode changes with automatic propagation of the state changes from the DCS to the DAQ. The improvements in the software and firmware allow suppress...

  8. Canadian Nuclear Safety Commission's intern program

    International Nuclear Information System (INIS)

    Gilmour, P.E.

    2002-01-01

    The Intern Program was introduced at the Canadian Nuclear Safety Commission, Canada's Nuclear Regulator in response to the current competitive market for engineers and scientists and the CNSC's aging workforce. It is an entry level staff development program designed to recruit and train new engineering and science graduates to eventually regulate Canada's nuclear industry. The program provides meaningful work experience and exposes the interns to the general work activities of the Commission. It also provides them with a broad awareness of the regulatory issues in which the CNSC is involved. The intern program is a two-year program focusing on the operational areas and, more specifically, on the generalist functions of project officers. (author)

  9. Commissioning of the TRIUMF ISAC RF system

    International Nuclear Information System (INIS)

    Fong, K.; Fang, S.; Laverty, M.; Lu, J.; Poirier, R.L.

    2001-09-01

    The ISAC RF system at present consists of a Radio Frequency Quadrupole accelerator, five Drift Tube Linear Accelerators, six bunchers, two choppers and a bunch rotator. The RFQ operates at the fundamental frequency of 35.36 MHz, while the DTLs operate at the third harmonic frequency of 106.08 MHz. The operating power ranges from 45 W to 120 W for the choppers, 1 kW to 20 kW for the DTLs and bunchers, and 80 kW for the RFQ. These cavities have been commissioned to operate synchronously with both closed-loop amplitude and phase regulation, as well as automatic tuning of the cavities. This paper gives a brief summary of the commissioning experience. (author)

  10. History of the Atomic Energy Commission

    International Nuclear Information System (INIS)

    Buck, A.L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  11. Status of the SPIRAL2 injector commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Thuillier, T., E-mail: thuillier@lpsc.in2p3.fr; Angot, J.; Jacob, J.; Lamy, T.; Sole, P. [LPSC, Université Grenoble Alpes, CNRS/IN2P3, 53 rue des Martyrs, 38026 Grenoble Cedex (France); Barué, C.; Bertrand, P.; Canet, C.; Ferdinand, R.; Flambard, J.-L.; Jardin, P.; Lemagnen, F.; Maunoury, L.; Osmond, B. [GANIL, CNRS/IN2P3, Bvd Henri Becquerel, BP 55027, 14076 Caen Cedex 5 (France); Biarrotte, J. L. [IPN Orsay, Université Paris Sud, CNRS/IN2P3, 15 rue Georges Clémenceau, 91406 Orsay Cedex (France); Denis, J.-F.; Roger, A.; Touzery, R.; Tuske, O.; Uriot, D. [Irfu, CEA Saclay, DSM/Irfu/SACM, 91191 Gif Sur Yvette (France); and others

    2016-02-15

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

  12. History of the Atomic Energy Commission

    International Nuclear Information System (INIS)

    Buck, A.L.

    1982-08-01

    This pamphlet traces the history of the Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946, to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  13. Nuclear Regulatory Commission Information Digest, 1991 edition

    International Nuclear Information System (INIS)

    Olive, K.L.

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs

  14. Division V: Commission 42: Close Binaries

    Science.gov (United States)

    Ribas, Ignasi; Richards, Mercedes T.; Rucinski, Slavek; Bradstreet, David H.; Harmanec, Petr; Kaluzny, Janusz; Mikolajewska, Joanna; Munari, Ulisse; Niarchos, Panagiotis; Olah, Katalin; Pribulla, Theodor; Scarfe, Colin D.; Torres, Guillermo

    2015-08-01

    Commission 42 (C42) co-organized, together with Commission 27 (C27) and Division V (Div V) as a whole, a full day of science and business sessions that were held on 24 August 2012. The program included time slots for discussion of business matters related to Div V, C27 and C42, and two sessions of 2 hours each devoted to science talks of interest to both C42 and C27. In addition, we had a joint session between Div IV and Div V motivated by the proposal to reformulate the division structure of the IAU and the possible merger of the two divisions into a new Div G. The current report gives an account of the matters discussed during the business session of C42.

  15. Nuclear Regulatory Commission issuances, September 1988

    International Nuclear Information System (INIS)

    1988-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  16. Securities and Exchange Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ...: 3235-AK58 420. REVISIONS TO REGULATION D Legal Authority: 15 USC 77b(a)(15); 15 USC 77b(b); 15 USC 77d; 15 USC 77r; 15 USC 77s; 15 USC 77s(a); 15 USC 77z-3 Abstract: The Division is considering... SOLICITATION ENHANCEMENTS Legal Authority: 15 USC 78n Abstract: The Commission proposed amendments to its proxy...

  17. Viet Nam National Atomic Energy Commission

    International Nuclear Information System (INIS)

    1992-01-01

    Vietnam National Atomic Energy Commission (VINATOM) is a governmental body in charge of organizing and coordinating activities related to use of nuclear energy for peaceful purpose. VINATOM in structure consists of the Nuclear Research Institute (Dalat), the Institute of Nuclear Science and Technology (Hanoi), the Institute for Technology of Radioactive and Rare Elements (Hanoi), and the Centre for Nuclear Technique Application (Ho Chi Minh City). This catalogue introduces profiles of nuclear R and D activities under management by VINATOM. (N.H.A)

  18. Indexes to Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index

  19. European commission report on market opening

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    Governments must step up their effort to implement measures relating to market opening within the framework of the directives on gas and electricity. Only greater integration of national markets will produce the improvements required from a competitive point of view on the domestic energy market. These are the main conclusions of the annual report on domestic electricity and gas market operation adopted by the European Commission at the beginning of January 2005. (author)

  20. Indexes to Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

  1. COMMISSIONING CNI PROTON POLARIMETERS IN RHIC

    International Nuclear Information System (INIS)

    HUANG, H.; BRAVAR, A.; LI, Z.; MACKAY, W.W.; MAKDISI, Y.; RESCIA, S.; ROSER, T.; SURROW, B.; BUNCE, G.; DESHPANDE, A.; GOTO, Y.; ET AL

    2002-01-01

    Two polarimeters based on proton carbon elastic scattering in the Coulomb Nuclear Interference (CNI) region have been installed and commissioned in the Blue and Yellow rings of RHIC during the first RHIC polarized proton collider run. Each polarimeter consists of ultra-thin carbon targets and six silicon detectors. With newly developed wave form digitizers, they provide fast and reliable polarization information for both rings

  2. Philippine Atomic Energy Commission: Annual report 1982

    International Nuclear Information System (INIS)

    1983-02-01

    This publication enumerates the research and development activities of the Philippine Atomic Energy Commission with priorities geared towards achieving the economic and social upliftment of the Filipinos in the field of agriculture, energy, industry, health and environment. Highlights are summaries of investigations and studies of great importance in crop improvement, animal production, nuclear fuels, nutrition research, not to mention its supportive technology, technical services, nuclear information and public acceptance, and nuclear manpower development. (RTD)

  3. Commissioning an Engineering Scale Coal Gasifier

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  4. Nuclear Regulatory Commission Information Digest: 1993 edition

    International Nuclear Information System (INIS)

    1993-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the U.S. Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1992, with exceptions noted. Information on generating capacity and average capacity factor for operating U.S. commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed. Comments and/or suggestions on the data presented are welcomed and should be directed to Karen Olive, United States Nuclear Regulatory Commission, Office of the Controller, Division of Budget and Analysis, Washington, D.C. 20555. For detailed and complete information about tables and figures, refer to the source publications

  5. NSLS-II commissioning and operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, G., E-mail: gwang@bnl.gov; Shaftan, T.; Bassi, G.; Bengtsson, J.; Blednykh, A.; Blum, E.; Cheng, W.; Choi, J.; Davidsaver, M.; Doom, L.; Fliller, R.; Ganetis, G.; Guo, W.; Hidaka, Y.; Kramer, S.; Li, Y.; Podobedov, B.; Qian, K.; Rose, J.; Seletskiy, S. [Brookhaven National Laboratory, Upton, NY 11973 (United States); and others

    2016-07-27

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

  6. CEBAF Cryomodule Commissioning in the South Linac

    International Nuclear Information System (INIS)

    M. Drury; H. Lankford; T. Lee; J. Marshall; J. Preble; Q. Saulter; W. Schneider; Michael Spata; Mark Wiseman

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, 38 1/4 cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz[1]. A cryomodule must provide an energy gain of 20 MeV to the 200 mu-A beam[2]. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's (Q(sub ext)) of the cavity ports, the unloaded Q (Q(sub 0)) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity[3]. Finally, the mechanical tuners are cycled and characterized. A portable test stand allows local control of the rf system and provides automated data acquisition. During the period from April 1993 through September 1993, 16 of the 20 cryomodules installed in the South Linac were commissioned. All cryomodules tested in the South Linac meet or exceed the CEBAF specifications. This paper describes the results of the commissioning of the first 10 cryomodules in the South Linac

  7. Environmental Protection Issues that Should Be Taken in Consideration in the Preparatory Phase of the Croatian Nuclear Power Program

    International Nuclear Information System (INIS)

    Ceramilac, S. Z.; Lebegner, J.; Vrankic, K.

    2012-01-01

    In accordance with the existing national legislation, the process of launching new power plants in Croatia is carried out in tight relationship with respect to their impact on environment. Preparation for the construction of first NPP in Croatia can't be any exception - contrary, strong public interest is expected at every stage of implementation of the national nuclear power plant project. In order to fulfil requirements of the environmental protection, numerous national and international acts should be taken into consideration. The intention of this paper is to be an inventory process of steps in the area of environmental protection in the pre-construction phase of the national NPP project. In this regard, following issues will be elaborated: identification of main organizations responsible for environmental protection in the process of launching NPP project on the national level (Ministry of Environment and Nature Protection, State Office for Radiological and Nuclear Safety, etc.), dentification of existing and still missing (if any) national legislation which will form the basis for the future process of site and technology assessment and approving, process of environmental impact assessment production, including strategic environmental impact assessment, initiation of transboundary impact of the project according to requirements of international conventions ratified by Croatia (Espoo and Aarhus Conventions) and specific project workflow containing all obligatory steps in approving commission of first NPP in Croatia from environmental point of view.(author).

  8. An overview of the QA principles and practices applied to the design, construction, commissioning and bringing into service of an intermediate-level waste encapsulation plant at BNFL Sellafield

    International Nuclear Information System (INIS)

    Lake, M.W.

    1989-01-01

    This paper describes the arrangements adopted by BNFL to ensure that a new ILW Encapsulation Plant Project is brought from project conception through to commercial operation within a QA system which complies with the appropriate standards and includes the following: the role of the QA function within BNFL Engineering; the organization of the commissioning process into a formal QA system to satisfy the requirements of the Nuclear Site License; and the preparatory work carried out by the Site's QA organization in the management of R and D, the selection and evaluation of raw material suppliers, and the bringing together of large numbers of particularly complex activities and differing organizations to provide assurance of quality of the ultimate product. The author presents an explanation of the arrangements adopted by BNFL to monitor the achievements of quality objectives and to ensure a comprehensive audit programme is maintained

  9. 17 CFR 146.9 - Appeals to the Commission.

    Science.gov (United States)

    2010-04-01

    ... Commission or any Commission employee has failed or refused to comply with provisions of the Privacy Act or... disagreement has been filed shall clearly note the portion which is disputed, and include a copy of the...

  10. Commissioning of Nuclear Power Plants. The AREVA approach

    International Nuclear Information System (INIS)

    Mateo, G.

    2014-01-01

    Georges Mateo, Fellow Expert at AREVA, closed the last day of conferences by detailing deeply the different phases of NPPs commissioning. He insisted on the skills required to be a Commissioning engineer and on the carrier opportunities that it offers

  11. Decommissioning and radioactive waste management. The European Commission overview

    International Nuclear Information System (INIS)

    Rehak, M

    2010-01-01

    In this lecture author deals with the European Commission overview on the decommissioning and radioactive waste management. Financial support of European Commission of decommissioning of the Ignalina NPP, Bohunice V1 NPP and Kozloduy Units 1 and 2 is presented.

  12. International Commission on Radiological Protection. History, policies, procedures

    International Nuclear Information System (INIS)

    Lindell, Bo; Dunster, H.J.; Valentin, Jack; )

    2000-01-01

    This report briefly reviews the history, mode of operation, concepts, and current policies of the International Commission on Radiological Protection (ICRP). It touches upon the objectives of the Commission's recommendations, the quantities used, the biological basis of the Commission's policy, the quantitative basis for its risk estimates, the structure of the system of protection, some problems of interpretation and application in that system, and the need for stability, consistency, and clarity in the Commission's recommendations. (author)

  13. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  14. Stepwise commissioning of a steam boiler with stability guarantees

    DEFF Research Database (Denmark)

    Johansen, Simon Vestergaard; Kallesøe, Carsten Skovmose; Bendtsen, Jan Dimon

    2016-01-01

    This paper aims to make the commissioning of an industrial MIMO controller more straightforward by gradually commissioning it from a set of SISO controllers, after the system has been started. For this purpose a stepwise commissioning strategy based on the Youla-Kucera parametrization has been de...... been commissioned from a SISO controller using the developed method on a real steam boiler and measurements show a clear performance improvement after transition....

  15. C46 `ASTRONOMY Education and Development': a Peculiar Commission

    Science.gov (United States)

    de Greve, Jean-Pierre; García, Beatriz; Gerbaldi, Michèle; Ferlet, Roger; Guinan, Edward; Hearnshaw, John; Jones, Barrie; Marschall, Laurence; Miley, George; Pasachoff, Jay; Ros, Rosa; Stavinschi, Magda; Torres-Peimbert, Silvia

    2016-04-01

    C46 was a Commission of the Executive Committee of the IAU under Division XII (Union-Wide Activities), then after 2012 under Division C (Education, Outreach, and Heritage). It was the only commission dealing exclusively with astronomy education; a previous Commission 38 (Exchange of Astronomers), which allocated travel grants to astronomers who needed them, and a Working Group on the Worldwide Development of Astronomy, have been absorbed by Commission 46.

  16. Point Lepreau G.S. commissioning management experience

    International Nuclear Information System (INIS)

    Alikhan, S.; Walker, W.J.

    1983-05-01

    This paper shares the experience gained by New Brunswick Power in commissioning its first nuclear plant, with particular emphasis on the management techniques that were developed. Some of the areas discussed include: organization of Nuclear Operations Group responsible for commissioning and its interface with construction; outline and scope of documentation required to define, execute and report commissioning to satisfy the licensing requirements, management techniques developed to implement commissioning; and a summary of lessons learned and recommendations for the future

  17. Commissioning of the ATLAS pixel detector

    International Nuclear Information System (INIS)

    Golling, Tobias

    2008-01-01

    The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented

  18. Nuclear Regulatory Commission issuances, March 1975

    International Nuclear Information System (INIS)

    1975-04-01

    Reactor licensing actions taken by the Nuclear Regulatory Commission, the Atomic Safety and Licensing Appeal Board and the Atomic Safety and Licensing Boards for March 1975 are presented. Action was included for the following reactors: Big Rock Point Nuclear Plant; West Valley Reprocessing Plant; Limerick Generating Station, Units 1 and 2; Midland Plants, Units 1 and 2; Wolf Creek Generating Station, Unit 1; Monticello Nuclear Generating Plant, Unit 1; Douglas Point Nuclear Generating Station, Units 1 and 2; Seabrook Station, Units 1 and 2; Vermont Yankee Nuclear Power Station; and WPPSS Hanford Units 1 and 4. (U.S.)

  19. The ATLAS Trigger System Commissioning and Performance

    CERN Document Server

    Hamilton, A

    2010-01-01

    The ATLAS trigger has been used very successfully to collect collision data during 2009 and 2010 LHC running at centre of mass energies of 900 GeV, 2.36 TeV, and 7 TeV. This paper presents the ongoing work to commission the ATLAS trigger with proton collisions, including an overview of the performance of the trigger based on extensive online running. We describe how the trigger has evolved with increasing LHC luminosity and give a brief overview of plans for forthcoming LHC running.

  20. Commission of energy regulation. 2004 activity report

    International Nuclear Information System (INIS)

    2004-01-01

    The commission of energy regulation (CRE) is an independent administrative authority in charge of the control of the operation of gas and electricity markets. This document is the fifth activity report of CRE and covers the July 1, 2003 - June 30, 2004 period, which corresponds to the era of opening of energy markets as a consequence of the enforcement of the June 26, 2003 European directive. In the framework of the stakes made by energy markets liberalization, this document presents the situation of the gas and electricity markets during this period (European framework, regulation of both markets, public utility mission..) and describes CRE's means for the monitoring of these markets. (J.S.)

  1. Nuclear Regulatory Commission: 1981 annual report

    International Nuclear Information System (INIS)

    1981-01-01

    This seventh annual report of the US Nuclear Regulatory Commission covers major actions, events and planning that occurred during fiscal year 1981, with some coverage of later events, where appropriate. Chapters of the report address the agency's various functions or areas of activity: regulating nuclear power plants; evaluating reactor operating experience; licensing nuclear materials and their transportation; safeguarding nuclear plants and materials; managing nuclear wastes; inspection and enforcement; cooperation with state governments; international activities; research and standards development; hearings; decisions and litigation; and administrative and public communications matters. Each chapter presents a detailed review of program accomplishments during the report period, fiscal year 1981

  2. Gentilly 2: design, construction and commissioning

    International Nuclear Information System (INIS)

    Amyot, Paul; Michel, Benoit.

    1982-06-01

    Construction of the Gentilly 2 power station is essentially complete, and commissioning is proceeding. The main activities during the 1981-82 period have been the completion of the construction and overall testing of the major systems. One cause of delay in the project in 1981 was the discovery of damage to the tubesheet of a steam generator. An internal manhole cover support in the steam generator head had become loose and had caused damage to the tube-to-tubesheet welds. Repairs to the welds were completed in Feb. 1982 after an extensive development program to qualify the welding procedure. Overall project life will be slightly more than 9 years

  3. Commissioning dosimetry at SINAGAMA irradiation facility

    International Nuclear Information System (INIS)

    Noriah Mod Ali; Hasan Sham; Taiman Kadni

    2000-01-01

    Dose mapping is one of the important factors in the commissioning of the irradiation plant. Comparison of the dose distribution obtained through the dose mapping exercise carried out since 1991 for Sinagama plant are described in this paper. It is aimed to confirmed the need for a thorough dose-mapping before the plant can be proceed with routine irradiation. The dose measurement was performed using a routine ceric-cerous dosimeter, supplied by the High Dose Dosimetry Laboratory, SSDL. The quality assurance of these service was maintain and verify through regular participation in dose intercomparison organised by the IAEA

  4. Commission 22: Meters, Meteorites and Interplanetary Dust

    Science.gov (United States)

    Watanabe, Junichi; Jenniskens, Peter; Spurný, Pavel; Borovička, Jiří; Campbell-Brown, Margaret; Consolmagno, Guy; Jopek, Tadeusz; Vaubaillon, Jeremie; Williams, Iwan P.; Zhu, Jin

    2010-05-01

    The business meeting of commission 22 was held at the room 5 in the SulAmerica Convention Center in Rio de Janeiro(14:00-15:30). Fifteen people attended at this meeting:J.Borovička, E.Bowell, G.Consolmagno, D.Green, P. Jenniskens, A. Pellinen-Wannberg, R. Rudawska, J. Watanabe, J. Zhu, P. H. A. Hasselmann, F. Ostroviski, D. A. Oszkiewicz, W. Thuillot, P. Mahajani, and A. Sule. This meeting was managed by Junichi Watanabe, the current C22 Vice-President. The summary of the meeting is described.

  5. Cognitive Enhancement and Beyond: Recommendations from the Bioethics Commission.

    Science.gov (United States)

    Allen, Anita L; Strand, Nicolle K

    2015-10-01

    Media outlets are reporting that cognitive enhancement is reaching epidemic levels, but evidence is lacking and ethical questions remain. The US Presidential Commission for the Study of Bioethical Issues (Bioethics Commission) has examined the issue, and we lay out the commission's findings and their relevance for the scientific community. Published by Elsevier Ltd.

  6. 77 FR 8095 - Technical Corrections to Commission Regulations

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 2 [Docket No. RM11-30-000; Order No. 756] Technical Corrections to Commission Regulations Issued February 8, 2012. AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule: correcting amendment. SUMMARY: This document adds...

  7. 75 FR 73083 - Sunshine Act Meeting; Open Commission Meeting

    Science.gov (United States)

    2010-11-29

    ... FEDERAL COMMUNICATIONS COMMISSION Sunshine Act Meeting; Open Commission Meeting November 30, 2010. The Federal Communications Commission will hold an Open Meeting on the subjects listed below on... demonstrate accessibility technologies. The meeting site is fully accessible to people using wheelchairs or...

  8. Commission administration. National Low-Level Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1984-09-01

    This report is one in a series of commission option documents prepared for the US Department of Energy, designed to assist regional low-level waste compact commissions in their organization, administration and efforts to effectively manage waste within their regions. In particular, this report addresses topics related to commission administrative procedures, personnel, procurement and finance

  9. 47 CFR 0.420 - Other Commission publications.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications Common...

  10. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    Science.gov (United States)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  11. 76 FR 71449 - Reporting Line for the Commission's Ethics Counsel

    Science.gov (United States)

    2011-11-18

    ... Ethics Counsel AGENCY: Securities and Exchange Commission. ACTION: Final rule. SUMMARY: The Securities... of the Ethics Counsel is now a stand-alone Office of the Commission and that the head of the Office, the Ethics Counsel, reports directly to the Chairman of the Commission. DATES: Effective Date...

  12. Educational Change by Commission: Attempting "Trickle Down" Reform.

    Science.gov (United States)

    Ginsberg, Rick; Wimpelberg, Robert K.

    1987-01-01

    The processes and procedures of national commissions on education are discussed. Elements of commonality are presented with a review of competing explanations of the popularity of such commissions. A sociopolitical thesis of educational reform through commissions is advanced, based on the "trickle down" theory of economics. (SLD)

  13. 17 CFR 9.26 - Participation of Commission staff.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Participation of Commission staff. 9.26 Section 9.26 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES... Respect to Appeals § 9.26 Participation of Commission staff. Within twenty days after receipt of the...

  14. 76 FR 24383 - Commission's Rules of Practice, Procedure, and Organization

    Science.gov (United States)

    2011-05-02

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 0 and 1 [GC Docket No. 10-44; FCC 11-16] Commission... docket management measures, such as broadening the use of docketed proceedings; expanding the requirement... effective date for FCC rules in the event the Commission does not specify an effective date in a rulemaking...

  15. 77 FR 58941 - Appeal Proceedings Before the Commission

    Science.gov (United States)

    2012-09-25

    ... forth more specific rules for the different types of appeals. Rules for appeals of ordinance..., 582, 583, 584, and 585 RIN 3141-AA47 Appeal Proceedings Before the Commission AGENCY: National Indian... Commission) promulgates this final rule to enhance and clarify appeal proceedings before the Commission. This...

  16. Report of the Nevada Commission on Nuclear Projects

    International Nuclear Information System (INIS)

    1986-11-01

    This summary represents the major conclusions reached by the Commission on Nuclear Projects. They reflect the Commission's experience with the high-level nuclear waste disposal program since 1985 and are the result of the Commission's scrutiny of both State and federal repository-related activities

  17. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ14-4-000] Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No. 1000 Further Regional Compliance Filing to be effective...

  18. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-05-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-000] Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to be effective 4/15/2011. Any person...

  19. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-001] Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to Compliance Filing to be effective 4/15/2011. Any...

  20. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2010-06-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ10-2-000] Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets for inclusion in its open access transmission...

  1. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-08-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-15-000] Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA) \\1\\ and Part 35 of the Federal Energy Regulatory...

  2. Leadership of healthcare commissioning networks in England: a mixed-methods study on clinical commissioning groups

    Science.gov (United States)

    Zachariadis, Markos; Oborn, Eivor; Barrett, Michael; Zollinger-Read, Paul

    2013-01-01

    Objective To explore the relational challenges for general practitioner (GP) leaders setting up new network-centric commissioning organisations in the recent health policy reform in England, we use innovation network theory to identify key network leadership practices that facilitate healthcare innovation. Design Mixed-method, multisite and case study research. Setting Six clinical commissioning groups and local clusters in the East of England area, covering in total 208 GPs and 1 662 000 population. Methods Semistructured interviews with 56 lead GPs, practice managers and staff from the local health authorities (primary care trusts, PCT) as well as various healthcare professionals; 21 observations of clinical commissioning group (CCG) board and executive meetings; electronic survey of 58 CCG board members (these included GPs, practice managers, PCT employees, nurses and patient representatives) and subsequent social network analysis. Main outcome measures Collaborative relationships between CCG board members and stakeholders from their healthcare network; clarifying the role of GPs as network leaders; strengths and areas for development of CCGs. Results Drawing upon innovation network theory provides unique insights of the CCG leaders’ activities in establishing best practices and introducing new clinical pathways. In this context we identified three network leadership roles: managing knowledge flows, managing network coherence and managing network stability. Knowledge sharing and effective collaboration among GPs enable network stability and the alignment of CCG objectives with those of the wider health system (network coherence). Even though activities varied between commissioning groups, collaborative initiatives were common. However, there was significant variation among CCGs around the level of engagement with providers, patients and local authorities. Locality (sub) groups played an important role because they linked commissioning decisions with

  3. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  4. Lessons learned from the shut down, planning, and the preparatory activities of decommissioning the research reactor VVR-S Magurele, Bucharest

    International Nuclear Information System (INIS)

    Dragusin, M.; Copaciu, V.

    2006-01-01

    The nuclear research reactor type VVR was shut down in December 1997 after forty years of operation. The main characteristics of this reactor are: Thermal power 2 MW, Thermal energy - 9.59 GWhd, Average flux of thermal neutrons-10 13 n/cm 2 .s, nine horizontal channels, sixteen vertical exposure channels, three biological channels, reactor type tank, water used as a moderator, coolant and reflector. The reactor was used in research and radioisotope production. The reactor has been permanently shut down since April 2002, when the decommissioning was officially announced. Discussions regarding funding mechanisms for the conservation phase, and decommissioning (planning, preparatory activities, spent nuclear fuel management), have taken place since five years ago when the final decision of permanent shut down was taken. Quality management includes procedures for recording and archiving the lessons learned. The planning of decommissioning started in 1990 when the reactor was still operational. After fifteen years the regulatory body has not yet approved the decommissioning plan for the reactor. In this paper the following aspects are discussed: decommissioning strategy from safe enclosure to immediate dismantling, specific features of the site (treatment of radioactive waste near reactor) and state of decommissioning, use of the lessons learned in the planning of decommissioning for the other two small nuclear facilities situated in the same area with VVR-reactor: Sub critical Assembly 'HELEN' and Zero Power Critical Reactor RP-0, AFR ponds for spent nuclear fuel, other radiological facilities for radioisotopes production facilities radiation processing and accelerators. Preparatory activities for decommissioning have included: elaboration of a plan (inter alia, justification of the selected strategy, management of the radioactive waste in accordance with the waste acceptance criteria), reactor storage in parallel with the removal of the equipment and materials used in

  5. Assessment of adolescents' communication on sexual and reproductive health matters with parents and associated factors among secondary and preparatory schools' students in Debremarkos town, North West Ethiopia.

    Science.gov (United States)

    Shiferaw, Kasiye; Getahun, Frehiwot; Asres, Getahun

    2014-01-08

    Sexuality and reproductive health are among the most fundamental aspects of life. Poor parental involvement in preparing young people for safe sexual life and good reproductive health was part of the blame for the lack of skills on sexual decision making. Despite the growing needs, there is no adequate health service or counseling specifically suitable for this specific age group and research on the role of parents in this process has yielded inconsistent results. The objective of the study is to assess adolescents' communication on sexual and reproductive health issues with parents and associated factors among secondary and preparatory schools students in Debremarkos town. School based study was conducted among secondary and preparatory schools students in Debremarkos town, from April 8 to 21, 2012. Multistage sampling and self administered questionnaires were employed. The proportion of the students who had discussion on sexual & reproductive health issues with their parent was found to be 254 (36.9%). Mother who able to read and write (AOR = 2; 95% CI 1.3 to 3.1), adolescents accepting discussion of sexual & reproductive health issues (AOR = 2.5 95% CI 1.3 to 4.5), adolescents who ever got SRH information (AOR = 2; 95% CI 1.4 to 2.9), adolescents who ever had sexual intercourse (AOR = 1.7; 95% CI 1.1 to 2.6) were found to have significant positive associations, and being grade 12 students (AOR = 0.4; 95% CI 0.2 to 0.7) and having less than three family size (AOR = 0.5; 95% CI 0.2 to 0.9) showed significant negative associations. Study unveils that parent -adolescent communications on sexual and reproductive health issues is low, only about one third of the students were communicating on SRH issues. Therefore; there is a need to equip and educate parents on different sexual & reproductive health issues. Comprehensive family life education should also be initiated for the students and parents.

  6. Risky sexual behaviors and associated factors among male and female students in Jimma Zone preparatory schools, South West Ethiopia: comparative study.

    Science.gov (United States)

    Fentahun, Netsanet; Mamo, Abebe

    2014-01-01

    Youth engage in risk sexual behavior due to insufficient knowledge of reproductive health and family planning. Youth sexual behavior is important not only because of the possible reproductive outcomes, but also because of sexually transmitted infections. The level of risks and sexual behaviors are different between male and female youth due to sexual exposure and socio-cultural factors. The aim of this study was to compare risky sexual behaviors and associated factors among male and female preparatory school (grades 11 and 12) students in Jimma Zone. A comparative cross-sectional study was conducted in 5 randomly selected preparatory schools of Jimma Zone. A total of 520 students were selected using simple random sampling technique. A structured, pretested and self-administered questionnaire was used to collect data. Both descriptive analysis and binary logistic regressions were performed on the data to understand risky sexual behaviors among students. Twenty-two (25.9%) of male and 25(21.6%) of female students had two or more sexual partners in the last six months. Eighty-three (32.3%), 113(43.5%) male and female students were sexually at risk in the last six months. Only 8(9.4%) of the male and 10(8.6%) of the female students used condom consistently in the last six months. Female students living away from their parents were 3 times more likely to be at risk than students living with their parents (OR 95%CI 3.0(1.48-6.34)). Female students who consumed alcohol were 7 times more likely to be at risk than those who did not consume alcohol (OR 95%CI 7.27(3.36-15.7)). Male students who consumed alcohol were 2.8 times more likely to be at risk than those who did not consumed alcohol (OR 95%CI, 2.81(1.3-6.06)). Male students who chewed khat were 4.6 times more likely to be at risk than students who did not chew khat (OR 95%CI, 4.58(1.95-10.76). Living arrangement, educational status of parents, family connectedness, alcohol consumption and khat-chewing were the major

  7. Translating landscape: the Colombian Chorographic Commission

    Directory of Open Access Journals (Sweden)

    Veronica Uribe Hanabergh

    2014-01-01

    Full Text Available In 1850 the Colombian government developed a project to survey the young country´s landscape. Scientists, writers, and artists were invited to make part of the project led by the Italian military, geographer and cartographer, Agustin Codazzi. After nine years and three different artists, the Commission had many watercolor drawings that portrayed a landscape, not only in its physical traits, but also in its social, economic and agricultural development. Through the lens of these artists, the drawings that concluded the survey showed a landscape that was truly original but that was also seen through the lens of a certain romantic eye inherited by a firm European legacy. As a result, these watercolors show the different regions, people, and means of transportation, crops and trades. The Colombian Chorographic Commission was an important project in the construction of the Colombian modern nation, a country that was constantly divided by federalist and centralist politics, liberal and conservative parties. An interesting union between science, politics and art, these drawings represent the process of the modernization of nineteenth-century Colombia.

  8. Acceptance, commissioning and quality control in radiosurgery

    International Nuclear Information System (INIS)

    Toreti, Dalila Luzia

    2009-01-01

    Stereotactic Radiosurgery is a treatment technique that uses narrow beams of radiation focused with great accuracy in a small lesion. The introduction of micro multi leaf collimators (mMLC) allows this technique to reach a higher degree of dose conformation of the target lesion allowing a smaller irradiation of critical structures and normal tissues. This paper presents the results of the acceptance tests and commissioning of a Varian 6EX linear accelerator dedicated to radiosurgery associated with the BrainLab micro multi leaf collimator installed in the Hospital das Clinicas da Faculdade de Medicina da USP (HC-FMUSP) and establish feasible quality assurance program for the services that employ this special technique. The results of the acceptance tests were satisfactory and are willing with the specifications provided by the manufacturer and the commissioning tests were within the international recommendations. The tests and measures that are part of quality control process should be specific to each treatment unit, and the need, frequency and levels of tolerance

  9. Chilean Nuclear Energy Commission dosimetric information system

    International Nuclear Information System (INIS)

    Guerrero Vallejos, Patricia Andrea

    1997-01-01

    This thesis discusses the nuclear radiation that people who work with radioactive material is exposed to and its control by the Chilean Nuclear Energy Commission. A full analysis of the System is presented with information about the Commission and the Department of Nuclear and Radiological Safety which runs the System. Ana analysis of the System is presented in order to obtain requirements. Management flow diagrams, the processes involved and current problems experienced by the users are described. A design logic is modeled producing Data Flow Diagrams (DFD). based on this physical design, or, Model of Physical Data, is prepared including tables, attributes, types of data, primary and foreign keys. A description is presented of how the System is implemented, the tools that are used and how the testing phase is carried out. The Dosimetry System meets the criteria for a Software Engineering project, where the basic cycle was used as a working methodology. The System developed supports the dosimetric control of people exposed to radioactive material. (author)

  10. Commissioning of research reactors. Safety guide

    International Nuclear Information System (INIS)

    2006-01-01

    The objective of this Safety Guide is to provide recommendations on meeting the requirements for the commissioning of research reactors on the basis of international best practices. Specifically, it provides recommendations on fulfilling the requirements established in paras 6.44 and 7.42-7.50 of International Atomic Energy Agency, Safety of Research Reactors, IAEA Safety Standards Series No. NS-R-4, IAEA, Vienna (2005) and guidance and specific and consequential recommendations relating to the recommendations presented in paras 615-621 of International Atomic Energy Agency, Safety in the Utilization and Modification of Research Reactors, Safety Series No. 35-G2, IAEA, Vienna (1994) and paras 228-229 of International Atomic Energy Agency, Safety Assessment of Research Reactors and Preparation of the Safety Analysis Report, Safety Series No. 35-G1, IAEA, Vienna (1994). This Safety Guide is intended for use by all organizations involved in commissioning for a research reactor, including the operating organization, the regulatory body and other organizations involved in the research reactor project

  11. Surrogacy: The experience of Greek commissioning women.

    Science.gov (United States)

    Papaligoura, Zaira; Papadatou, Danai; Bellali, Thalia

    2015-12-01

    Available studies on surrogacy are extremely limited. Findings suggest that surrogacy is experienced as problem free, with a significant number of commissioning mothers maintaining contact with the surrogates over time. To explore the experiences of Greek commissioning women regarding the surrogacy arrangement and birth of a child through surrogacy. The data of this study were collected from 7 intended mothers who had either a long history of infertility or serious health problems. Interviews were tape-recorded, transcribed and analysed employing content analysis. The analysis of the women's accounts revealed three themes: (a) a shared journey, (b) the birth of a long-awaited child, and (c) the surrogacy disclosure. The surrogacy process became the women's affairs, with their partners offering backstage support. A very close bond was developed with the surrogates, characterised by daily contacts and care-giving behaviours. While this bond was abruptly discontinued after the child's birth, it was interiorised with all participants being grateful to their surrogate. The timing and content of the surrogacy disclosure to family and child(ren) were carefully chosen by participants, who avoided providing information when egg donation was involved. Findings are reassuring for women who want to parent a child through a surrogate arrangement, and suggest that the availability of counselling services may help intended mothers to cope with disclosure issues. Copyright © 2015 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.

  12. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    L. Malgeri

    2011-01-01

    As the technical interventions were finishing up and services restored at P5 we started central operations again in 2011. We started operations with a reduced shift crew, Shift leader and DCS shifter, on 24th January. We had a first mid-week global run on 2nd and 3rd February followed by cosmic data-taking between 10th and 20th February. Due to delays with cooling for the strip tracker the useful cosmic data-taking with the strip tracker was reduced to about four days. On 20th February, the LHC started beam commissioning, and cosmic data-taking with the full CMS detector was stopped. The machine availability has been much higher during the 2011 beam commissioning than during the comparable time period in 2010. This has given us few opportunities to turn on the tracker for further cosmic data-taking. Many changes and upgrades were performed during the winter shutdown. Among them was an upgrade to running the central DAQ on 64 bit. All of these upgrades have now b...

  13. President's Commission and the normal accident

    International Nuclear Information System (INIS)

    Perrow, C.

    1982-01-01

    This chapter incorporates the major points of an analysis of the accident at Three Mile Island that I prepared in September 1979. In contrast to the findings of the President's Commission (1979), I did not view the accident as the result of operator error, an inept utility, or a negligent Nuclear Regulatory Commission but as a consequence of the complexity and interdependence that characterize the system itself. I argued that the accident was inevitable-that is, that it could not have been prevented, foreseen, or quickly terminated, because it was incomprehensible. It resembled other accidents in nuclear plants and in other high risk, complex and highly interdependent operator-machine systems; none of the accidents were caused by management or operator ineptness or by poor government regulation, though these characteristics existed and should have been expected. I maintained that the accident was normal, because in complex systems there are bound to be multiple faults that cannot be avoided by planning and that operators cannot immediately comprehend

  14. Linac4 chopper line commissioning strategy

    CERN Document Server

    Bellodi, G; Lombardi, A M; Posocco, P A; Sargsyan, E

    2010-01-01

    The report outlines the strategy for beam-based commissioning of the Linac4 3 MeV chopper line as currently scheduled to start in the second half of 2011 in the Test Stand Area. A dedicated temporary diagnostics test bench will complement the measurement devices foreseen for permanent installation in the chopper line. A commissioning procedure is set out as a series of consecutive phases, each one supposed to meet a well- defined milestone in the path to fully characterise the beam-line. Specific set-ups for each stage are defined in terms of beam characteristics, machine settings and diagnostics used. Operational guidelines are given and expected results at the relative points of measurements are shown for simulated scenarios (on the basis of multi-particle tracking studies carried out with the codes PATH and TRACEWin). These are then interpreted in the light of the resolution limits of the available diagnostics instruments to assess the precision reach on individual measurements and the feasibility of techn...

  15. PLEIADES-HR IMAGE QUALITY COMMISSIONING

    Directory of Open Access Journals (Sweden)

    L. Lebègue

    2012-07-01

    Full Text Available PLEIADES is the highest resolution civilian earth observing system ever developed in Europe. This imagery program is conducted by the French National Space Agency, CNES. It operates since 2012 a first satellite PLEIADES-HR launched on 2011 December 17th, a second one should be launched by the end of the year. Each satellite is designed to provide optical 70 cm resolution coloured images to civilian and defence users. The Image Quality requirements were defined from users studies from the different spatial imaging applications, taking into account the trade-off between on-board technological complexity and ground processing capacity. The assessment of the image quality and the calibration operation have been performed by CNES Image Quality team during the 6 month commissioning phase that followed the satellite launch. These activities cover many topics gathered in two families : radiometric and geometric image quality. The new capabilities offered by PLEIADES-HR agility allowed to imagine new methods of image calibration and performance assessment. Starting from an overview of the satellite characteristics, this paper presents all the calibration operations that were conducted during the commissioning phase and also gives the main results for every image quality performance.

  16. Validation Tools for ATLAS Muon Spectrometer Commissioning

    International Nuclear Information System (INIS)

    Benekos, N.Chr.; Dedes, G.; Laporte, J.F.; Nicolaidou, R.; Ouraou, A.

    2008-01-01

    The ATLAS Muon Spectrometer (MS), currently being installed at CERN, is designed to measure final state muons of 14 TeV proton-proton interactions at the Large Hadron Collider (LHC) with a good momentum resolution of 2-3% at 10-100 GeV/c and 10% at 1 TeV, taking into account the high level background enviroment, the inhomogeneous magnetic field, and the large size of the apparatus (24 m diameter by 44 m length). The MS layout of the ATLAS detector is made of a large toroidal magnet, arrays of high-pressure drift tubes for precise tracking and dedicated fast detectors for the first-level trigger, and is organized in eight Large and eight Small sectors. All the detectors of the barrel toroid have been installed and the commissioning has started with cosmic rays. In order to validate the MS performance using cosmic events, a Muon Commissioning Validation package has been developed and its results are presented in this paper. Integration with the rest of the ATLAS sub-detectors is now being done in the ATLAS cavern

  17. Report of the State of Nevada Commission on Nuclear Projects

    International Nuclear Information System (INIS)

    1990-12-01

    This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission's functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts

  18. Members of the Science and Technology Commission, Spanish Senate

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    Photo 01: (left to right) Mr Francisco Xabier Albistur, Senator; Mrs Mercedes Senen, Lawyer of the Commission; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Prof. Luciano Maiani, CERN Director-General, Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 02: Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book. Photos 03, 04: Mr Ramon Antonio Socias, Second Vice-President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 05: Mr Francisco Xabier Albistur, Senator, signing the VIP visitors' book. Photo 06: Mrs Mercedes Senen, Lawyer of the Commission, signing the VIP visitors' book. Photo 07: (left to right) Mr Francisco Xabier Albistur, Senator; Prof. Juan Antonio Rubio, Education and Technology Transfer Division Leader; Prof. Luciano Maiani, CERN Director-General; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Mr Alonso Arroyo, President of the C...

  19. Truth Commissions, Education, and Positive Peace: An Analysis of Truth Commission Final Reports (1980-2015)

    Science.gov (United States)

    Paulson, Julia; Bellino, Michelle J.

    2017-01-01

    Transitional justice and education both occupy increasingly prominent space on the international peacebuilding agenda, though less is known about the ways they might reinforce one another to contribute towards peace. This paper presents a cross-national analysis of truth commission (TC) reports spanning 1980-2015, exploring the range of…

  20. "I want to be 100 years old, but I smoke too much": Exploring the gap between positive aging goals and reported preparatory actions in different social circumstances.

    Science.gov (United States)

    Craciun, Catrinel; Flick, Uwe

    2015-12-01

    Preparing for positive aging is shaped by the social context a person lives in. The present qualitative study explores and compares representations about preparatory actions in precarious workers (i.e., with temporary job contracts and insecure pension plans) and individuals with secure pension plans living in Germany. It also examines, the discrepancy between what middle-aged persons think they should be doing in preparation and what they report doing for aging well. Findings from the analysis of the semi-structured interviews conducted here show that people who have insecure pension plans tend to see themselves as social networkers and optimists, while those with secure pension plans see themselves as social activists and careful planners of old age. All participants value an active, healthy body but manage to do little in order to attain it due to lacking time and discipline. In accordance with the socioemotional selectivity theory, perceiving a short-time perspective makes precarious individuals focus on emotional goals, while financially secure individuals value social goals. Implications for practice and policy change are discussed. Copyright © 2015 Elsevier Inc. All rights reserved.

  1. Results of the 3rd Review Meeting of the Convention on Nuclear Safety and Preparatory Works for the 4th Meeting

    International Nuclear Information System (INIS)

    Choi, Young Sung; Choi, Kwang Sik; Kim, Woong Sik

    2006-01-01

    The 3 rd Review Meeting of the Convention on Nuclear Safety (CNS) took place from April 11-22, 2005. Fifty out of fifty-five Contracting Parties (CPs) participated with over 500 delegates in attendance. It was concluded that all CPs in attendance were in compliance with the requirements of the CNS. It was also noted that although the focus tends to be on the triennial national reports and review meetings, the CNS should emphasize an ongoing process that continually promotes the advancement of nuclear safety. With regard to this continuity process, the President of the 3 rd Review Meeting sent to all the CPs a message to remind of the lessons offered and learned from the Meeting and to put them into action as well. The president also asked that the CPs start in earnest later this year their preparations for the Forth Meeting in 2008. This paper introduces the results of the 3 rd Review Meeting and presents some suggestions on preparatory works that should be done for the next Review Meeting

  2. Effects on Student Achievement in General Chemistry Following Participation in an Online Preparatory Course. ChemPrep, a Voluntary, Self-Paced, Online Introduction to Chemistry

    Science.gov (United States)

    Botch, Beatrice; Day, Roberta; Vining, William; Stewart, Barbara; Rath, Kenneth; Peterfreund, Alan; Hart, David

    2007-03-01

    ChemPrep was developed to be a stand-alone preparatory short-course to help students succeed in general chemistry. It is Web-based and delivered using the OWL system. Students reported that the ChemPrep materials (short information pages, parameterized questions with detailed feedback, tutorials, and answers to questions through the OWL message system) permitted them to work independently without the need for textbook or lecture. On average, students who completed ChemPrep had higher grades in the subsequent GenChem, Nursing, and Honors chemistry courses, with a greater percentage achieving a grade of C- or higher. Participation in ChemPrep was voluntary, and more women than men responded. Students in the Honors course enrolled in ChemPrep in higher percentages than students in GenChem and Nursing. SAT and departmental math placement exam scores were used as proxy measures of prior achievement and ability. Based on these, Honors chemistry ChemPrep users were on par with their peers but performed better in the course than non-users. In GenChem and Nursing chemistry courses, ChemPrep helped students of high prior achievement and ability perform better than their achievement scores would predict. Weaker or less motivated students did not respond to the voluntary offerings of ChemPrep in the same numbers as stronger or more motivated students, and we are seeking alternate ways to reach this population.

  3. Israel Atomic Energy Commission 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Selecting the research efforts to be highlighted in the Israel Atomic Energy Commission`s Annual Report from the large body and broad spectrum of ongoing work is not an easy task. The extensive bibliography of published results attached to the report attests to the scope of this difficulty. Of the many worthwhile projects, four were chosen to represent best the current trends in the continuing R and D program at the research centers of the Israel Atomic Energy Commission. One of these trends is the growing cooperation with private industry, in an attempt to gear our R and D programs to respond to market demands. Another feature, noted already several years ago, is the extensive collaboration of our scientists and engineers with colleagues at other institutions, in Israel and abroad. some of the work reported is part of evolving international industrial cooperation projects, illustrating both these trends. Following a trend common to many nuclear research centers around the world, a substantial part of our research effort is non-nuclear in nature. This is illustrated in the first article, which deals with advances in the application of non-linear optics in diverse fields of science and technology. These include state-of-the-art solid-state lasers, rapid modulation of light signals, development and generation of tunable sources of coherent light, optical data storage and the microscopic probing of biological and inorganic samples. The present work reports on a range of R and D, from the fundamentals of non-linear optical materials to proof-of-principle demonstrations of non-linear subwavelength resolution microscopy, to fabrication of prototype commercial tunable laser systems The second report considers the microstrain characteristics in some alloys using X-ray diffraction (XRD). The research utilizes XRD line broadening effects to study the characteristics of alloys from especially prepared surfaces. These characteristics include the homogeneity of alloying

  4. Division B Commission 6: Astronomical Telegrams

    Science.gov (United States)

    Yamaoka, H.; Green, D. W. E.; Samus, N. N.; Aksnes, K.; Gilmore, A. C.; Nakano, S.; Sphar, T.; Tichá, J.; Williams, G. V.

    2016-04-01

    IAU Commission 6 ``Astronomical Telegrams'' had a single business meeting during Honolulu General Assembly of the IAU. It took place on Tuesday, 11 August 2015. The meeting was attended by Hitoshi Yamaoka (President), Daniel Green (Director of the Central Bureau for Astronomical Telegrams, CBAT, via Skype), Steven Chesley (JPL), Paul Chodas (JPL), Alan Gilmore (Canterbury University), Shinjiro Kouzuma (Chukyo University), Paolo Mazzali (Co-Chair of the Supernova Working Group), Elena Pian (Scuola Normale Superiore di Pisa), Marion Schmitz (chair IAU Working Group Designations + NED), David Tholen (University of Hawaii), Jana Ticha (Klet Observatory), Milos Tichy (Klet Observatory), Giovanni Valsecchi (INAF\\slash Italy), Gareth Williams (Minor Planet Center). Apologies: Nikolai Samus (General Catalogue of Variable Stars, GCVS).

  5. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Document Server

    D. Acosta

    Run coordination and DPG The activities of the DPGs in the last six months have included the completion of publications (and many internal notes) on the data collected during CRAFT08 exercise, continuation of these studies with CRAFT09 data, and finally the first workflows and prompt feedback on 2009 LHC beam data. The level of readiness of the DPG prompt feedback groups is quite high, as first results from the early November “beam splash” data were shown to CMS within 24 hours of the first LHC beam. Moreover, results from the first collisions at 900 GeV were presented publicly three days afterward on November 26th. The CRAFT09 cosmic data taking period provided an opportunity to commission the calibration and alignment workflows on large data samples using the same software release series intended for the first LHC data, and to demonstrate routine operation of alignment and calibration workflows under production conditions. Significantly, the "prompt calibration loop" wa...

  6. QPS Upgrade and Re-commissioning

    CERN Document Server

    Denz, R

    2009-01-01

    Prior to the re-start of the Large Hadron Collider LHC in 2009 the protection system for superconducting devices QPS will be submitted to a substantial upgrade. The foreseen modifications will enhance the capability of the system in detecting problems related to the electrical interconnections between superconducting magnets as well as the detection of so-called aperture symmetric quenches in the LHC main magnets. The presentation will describe the design and implementation of the new protection layers and report on recent tests with prototype devices. It will address as well the planned steps for commissioning of the new system, possible limitations and the additional tools and procedures required to make use of its full capability. Finally the recent progress with respect to procurement, production, test and installation will be presented.

  7. Open Letter to the European Commission

    DEFF Research Database (Denmark)

    Savin, Andrej; Schwemer, Sebastian Felix

    2016-01-01

    to the information society. A key component of this acquis is the prohibition of general monitoring obligations to the benefit of providers of intermediary services. It is a means to achieve at least two central objectives: the encouragement of innovation as well as the protection of fundamental rights of all...... Internet users, namely the rights protected by Articles 8 and 11 of the European Convention of Human Rights. Yet, the proposed Copyright Directive, in particular, seems to negatively affect both the domain and effect of Article 15 of the E-commerce Directive. The signatories of this open letter therefore...... urge the European Commission to take into account the human rights dimension of Article 15 of the E-commerce Directive, as made explicit by the Court of the Justice of the European Union, and to make sure its implications are carefully examined across sectors. Authors: Sophie Stalla-Bourdillon Eleonora...

  8. ARIEL e-LINAC: Commissioning and Development

    Science.gov (United States)

    Laxdal, R. E.; Zvyagintsev, V.

    2016-09-01

    A superconducting electron Linac (e-Linac) will be a part of the ARIEL facility for the production of radioactive ion beams (RIB) at TRIUMF. The e-Linac will consist of five 1.3GHz 9-cell cavities in three cryomodules delivering a 50MeV 10mA beam. The baseline operation will be single pass but a re-circulating ring is planned to allow either energy boost or energy recovery operation. The first stage of the accelerator which consists of two cryomodules has been successfully commissioned in 2014. The paper will discuss the superconducting radio-frequency (SRF) challenges of the accelerator. Cavities, crymodules and RF system design, preparation, and performance will be presented.

  9. Commissioning the CMS alignment and calibration framework

    International Nuclear Information System (INIS)

    Futyan, David

    2010-01-01

    The CMS experiment has developed a powerful framework to ensure the precise and prompt alignment and calibration of its components, which is a major prerequisite to achieve the optimal performance for physics analysis. The prompt alignment and calibration strategy harnesses computing resources both at the Tier-0 site and the CERN Analysis Facility (CAF) to ensure fast turnaround for updating the corresponding database payloads. An essential element is the creation of dedicated data streams concentrating the specific event information required by the various alignment and calibration workflows. The resulting low latency is required for feeding the resulting constants into the prompt reconstruction process, which is essential for achieving swift physics analysis of the LHC data. This report discusses the implementation and the computational aspects of the alignment and calibration framework. Recent commissioning campaigns with cosmic muons, beam halo and simulated data have been used to gain detailed experience with this framework, and results of this validation are reported.

  10. Commissioning the CMS Alignment and Calibration Framework

    CERN Document Server

    Futyan, David

    2009-01-01

    The CMS experiment has developed a powerful framework to ensure the precise and prompt alignment and calibration of its components, which is a major prerequisite to achieve the optimal performance for physics analysis. The prompt alignment and calibration strategy harnesses computing resources both at the Tier-0 site and the CERN Analysis Facility (CAF) to ensure fast turnaround for updating the corresponding database payloads. An essential element is the creation of dedicated data streams concentrating the specific event information required by the various alignment and calibration workflows. The resulting low latency is required for feeding the resulting constants into the prompt reconstruction process, which is essential for achieving swift physics analysis of the LHC data. This report discusses the implementation and the computational aspects of the alignment and calibration framework. Recent commissioning campaigns with cosmic muons, beam halo and simulated data have been used to gain detailed experience...

  11. The commissioning of the BRISOL facility

    Energy Technology Data Exchange (ETDEWEB)

    Tang, B., E-mail: tangb364@126.com; Cui, B.; Chen, L.; Huang, Q.; Ma, R.; Ma, Y.; Ma, X.; Zhang, T.; Jiang, W.

    2016-06-01

    The Beijing Radioactive ion beam facility Isotope Separator On-Line (BRISOL) is a radioactive ion beam facility based on a 100 MeV cyclotron providing 100 μA proton beam bombarding a thick target to produce radioactive nuclei, which are transferred into an ion source to produce a singly-charged ion beam. The construction and installation of BRISOL was completed in March 2014. The commissioning of the BRISOL facility with stable beams has been carried out in the last year. The ion source, the separator and the beam-line were tested with a {sup 39}K{sup +} stable beam. The tests and the current status of the BRISOL facility will be presented in this paper.

  12. ARIEL e-LINAC: Commissioning and Development

    International Nuclear Information System (INIS)

    Laxdal, R.E.; Zvyagintsev, V.

    2016-01-01

    A superconducting electron Linac (e-Linac) will be a part of the ARIEL facility for the production of radioactive ion beams (RIB) at TRIUMF. The e-Linac will consist of five 1.3GHz 9-cell cavities in three cryomodules delivering a 50MeV 10mA beam. The baseline operation will be single pass but a re-circulating ring is planned to allow either energy boost or energy recovery operation. The first stage of the accelerator which consists of two cryomodules has been successfully commissioned in 2014. The paper will discuss the superconducting radio-frequency (SRF) challenges of the accelerator. Cavities, crymodules and RF system design, preparation, and performance will be presented. (paper)

  13. Commissioning results of the HZB quadrupole resonator

    CERN Document Server

    Kleindienst, Raphael; Knobloch, Jens; Kugeler, Oliver

    2015-01-01

    Recent cavity results with niobium have demonstrated the necessity of a good understanding of both the BCS and residual resistance. For a complete picture and comparison with theory, it is essential that one can measure the RF properties as a function of field, temperature, frequency and ambient magnetic field. Standard cavity measurements are limited in their ability to change all parameters freely and in a controlled manner. On the other hand, most sample measurement setups operate at fairly high frequency, where the surface resistance is always BCS dominated. The quadrupole resonator, originally developed at CERN, is ideally suited for characterization of samples at typical cavity RF frequencies. We report on a modified version of the QPR with improved RF figures of merit for high-field operation. Experimental challenges in the commissioning run and alternate designs for simpler sample changes are shown alongside measurement results of a large grain niobium sample.

  14. Advanced photoinjector experiment photogun commissioning results

    Directory of Open Access Journals (Sweden)

    F. Sannibale

    2012-10-01

    Full Text Available The Advanced Photoinjector Experiment (APEX at the Lawrence Berkeley National Laboratory is dedicated to the development of a high-brightness high-repetition rate (MHz-class electron injector for x-ray free-electron laser (FEL and other applications where high repetition rates and high brightness are simultaneously required. The injector is based on a new concept rf gun utilizing a normal-conducting (NC cavity resonating in the VHF band at 186 MHz, and operating in continuous wave (cw mode in conjunction with high quantum efficiency photocathodes capable of delivering the required charge at MHz repetition rates with available laser technology. The APEX activities are staged in three phases. In phase 0, the NC cw gun is built and tested to demonstrate the major milestones to validate the gun design and performance. Also, starting in phase 0 and continuing in phase I, different photocathodes are tested at the gun energy and at full repetition rate for validating candidate materials to operate in a high-repetition rate FEL. In phase II, a room-temperature pulsed linac is added for accelerating the beam at several tens of MeV to reduce space charge effects and allow the measurement of the brightness of the beam from the gun when integrated in an injector scheme. The installation of the phase 0 beam line and the commissioning of the VHF gun are completed, phase I components are under fabrication, and initial design and specification of components and layout for phase II are under way. This paper presents the phase 0 commissioning results with emphasis on the experimental milestones that have successfully demonstrated the APEX gun capability of operating at the required performance.

  15. Phase C commissioning-Cernavoda Unit 2

    International Nuclear Information System (INIS)

    Munro, Robert

    2007-01-01

    Phase C commissioning program includes over 500 individual tests and checks which are carefully planned and scheduled at the correct power level. Some of the major tests are the following: - heat transport thermosyphoning test at 3% Full Power (FP); - dual computer failure test at 15% FP; - turbine overspeed test and generator first synchronization; - load rejection tests at 25, 50, 75 and 100% FP; - loss of Class IV Power test at 25% FP; - shutdown system (SDS nr. 1 and SDS nr. 2) tests at >60% FP; - condensate extraction and boiler feedwater pump trip tests at 100% FP; - power cycling through reactor setback from 100 to 10 and back to 100% FP; - condenser steam discharge valve tests with reactor at 100% FP and turbine at 60% output; - low pressure and high pressure heater box-up tests at 100% FP. Progress through the Phase C program is controlled at six specific Commissioning Control Points (CCPs) which meet the Romanian Regulatory Authority (CNCAN) and Management requirements. These CCPs are the following: PI - Approval for Power increase to 5% FP; PP1 - Approval for Power increase to 25% FP; PP2 - Approval for Power increase to 50% FP; PP3 - Approval for Power increase to 75% FP; PP4 - Approval for Power increase to 100% FP. Prior to releasing each of these CCPs both Management and CNCAN complete an assessment of the 'Readiness' to proceed to the next power plateau. The readiness includes a review of the plant material condition, results of previous tests, documentation status, and operability maintainability issues. (author)

  16. British Columbia Utilities Commission 2001 annual report

    International Nuclear Information System (INIS)

    2002-06-01

    The main responsibility of the British Columbia Utilities Commission is to regulate energy utilities under its jurisdiction to ensure that energy rates are fair and that utility operators in the province provide safe, adequate and secure service to their customers. The Commission also approves the construction of new facilities planned by utilities. It also participates in the review of utility and energy projects under the Environmental Assessment Act. Several successes were achieved in 2001 as the utility implemented its first performance plan. Oral public hearings were held for applications by Pacific Northern Gas and by Pembina Pipelines, owners of the common carrier oil pipeline from Taylor to Kamloops. A review of BC Gas' rate design to apportion utility revenue requirements fairly to different classes of customers was successfully achieved by a negotiated settlement process. In 2001, there was also a high level of proposed mergers, acquisitions and divestitures. Duke Energy Corporation's share acquisition of Westcoast Energy's two affiliated gas utilities was approved. BC Gas' application to divest its customer care activities to a joint venture company with Enbridge was also reviewed, and an oral hearing was held to review a West Kootenay Power application to sell its Kootenay River hydroelectric generation assets to Columbia Basin Trust and the Columbia Power Corp. In this case, the decision rendered was that the sale terms had to be changed so that customers could share the proceeds. The utility therefore, decided not to proceed with the sale under these conditions. The BC Hydro legislated rate freeze, which was due to expire on September 30, 2001, was extended for an additional 18 months to allow the new provincial government time to implement a new energy policy. The new energy policy is expected to give the province an energy advantage by facilitating growth and diversification in energy production while providing competition and more choice for

  17. Qinshan CANDU commissioning - a successful partnership

    International Nuclear Information System (INIS)

    Alikhan, S.; Thomson, J.; Jun, G.; Guoyuan, J.

    2004-01-01

    The Qinshan CANDU Nuclear Power Plant consists of 2 x 728 MWe CANDU 6 units, built in Zhejiang Province, China, by the Third Qinshan Nuclear Power Company (TQNPC) as the owner and Atomic Energy of Canada Limited (AECL) as the main contractor. The Contract between China National Nuclear Corporation (CNNC) and AECL was signed in November 1996 and became effective on February 12, 1997 with scheduled completion dates of February 12, 2003 for Unit 1 and November 12, 2003 for Unit 2. Unit 1 was declared in-service on December 31, 2002, 43 days ahead of schedule and Unit 2 was declared in service on July 20, 2003, 115 days ahead of schedule. The successful partnership between AECL, Bechtel, Hitachi and TQNPC working as a team is the key to this success. Total commissioning period from first energization of the system service transformer to in-service for both units was 20.7 months, which is significantly better than the experience at other comparable CANDU 6 units. It has clearly demonstrated the benefits of building two units together, about 6 months apart, to achieve optimum utilization of resources already mobilized for the first unit; the second unit is commissioned with less than 40% of the effort required for the first unit. Since in-service to the end of March 2004, Unit 1 has operated at a gross capacity factor of 93% and Unit 2 at 82.5%, including loss of production for one month in August 2003 to repair the failure of turbine LP blades tie-wire. (author)

  18. Advanced photoinjector experiment photogun commissioning results

    Science.gov (United States)

    Sannibale, F.; Filippetto, D.; Papadopoulos, C. F.; Staples, J.; Wells, R.; Bailey, B.; Baptiste, K.; Corlett, J.; Cork, C.; De Santis, S.; Dimaggio, S.; Doolittle, L.; Doyle, J.; Feng, J.; Garcia Quintas, D.; Huang, G.; Huang, H.; Kramasz, T.; Kwiatkowski, S.; Lellinger, R.; Moroz, V.; Norum, W. E.; Padmore, H.; Pappas, C.; Portmann, G.; Vecchione, T.; Vinco, M.; Zolotorev, M.; Zucca, F.

    2012-10-01

    The Advanced Photoinjector Experiment (APEX) at the Lawrence Berkeley National Laboratory is dedicated to the development of a high-brightness high-repetition rate (MHz-class) electron injector for x-ray free-electron laser (FEL) and other applications where high repetition rates and high brightness are simultaneously required. The injector is based on a new concept rf gun utilizing a normal-conducting (NC) cavity resonating in the VHF band at 186 MHz, and operating in continuous wave (cw) mode in conjunction with high quantum efficiency photocathodes capable of delivering the required charge at MHz repetition rates with available laser technology. The APEX activities are staged in three phases. In phase 0, the NC cw gun is built and tested to demonstrate the major milestones to validate the gun design and performance. Also, starting in phase 0 and continuing in phase I, different photocathodes are tested at the gun energy and at full repetition rate for validating candidate materials to operate in a high-repetition rate FEL. In phase II, a room-temperature pulsed linac is added for accelerating the beam at several tens of MeV to reduce space charge effects and allow the measurement of the brightness of the beam from the gun when integrated in an injector scheme. The installation of the phase 0 beam line and the commissioning of the VHF gun are completed, phase I components are under fabrication, and initial design and specification of components and layout for phase II are under way. This paper presents the phase 0 commissioning results with emphasis on the experimental milestones that have successfully demonstrated the APEX gun capability of operating at the required performance.

  19. Preparation of physics commissioning of Mochovce units 3 and 4

    International Nuclear Information System (INIS)

    Sedlacek, M.; Chrapciak, V.

    2010-01-01

    The Project 'Mochovce Units 3 and 4 Completion' started in 2009 and it will be finished in 2013. VUJE, Inc. is one of the five main Project contractors for the Nuclear Island and it is responsible, inter alia, for Mochovce Units 3 and 4 commissioning. The commissioning of Units 3 and 4 includes the stages of Physics Commissioning and Power Commissioning. This paper deals with the preparation of Mochovce Units 3 and 4 Physics Commissioning. In the paper there is presented a preparation of some commissioning documents, e.g. 'Quality Assurance Programme', 'Commissioning Programme', 'Stage Programme for Physics Commissioning', 'Test working programmes', 'Neutron-physics characteristics for Physics and Power Commissioning', etc. The scope of Physics Commissioning is presented by list of tests. For assessment of tests results so-called three-level acceptance criteria will be applied: realization, design and safety criteria. In the paper there are also presented computer codes, which will be used for neutron-physics characteristics calculation and the fuel loading scheme for the reactor core of Mochovce Unit 3. (Authors)

  20. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)