WorldWideScience

Sample records for preparation program approval

  1. Analysis of the Education Program Approval Process: A Program Evaluation.

    Science.gov (United States)

    Fountaine, Charles A.; And Others

    A study of the education program approval process involving the Veterans Administration (VA) and the State Approving Agencies (SAAs) had the following objectives: to describe the present education program approval process; to determine time and costs associated with the education program approval process; to describe the approval process at…

  2. 38 CFR 21.9765 - Program of education approval.

    Science.gov (United States)

    2010-07-01

    ... education offered by an institution of higher learning if that program of education is approved under 38 U.S... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Program of education... (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Approval of Programs of Education § 21...

  3. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  4. Academic Program Approval and Review Practices

    Directory of Open Access Journals (Sweden)

    Don G. Creamer

    1999-08-01

    Full Text Available This report outlines general and specific processes for both program approval and program review practices found in 50 states and eight foreign countries and regions.  Models that depict these procedures are defined and the strengths and weakness of each are discussed.  Alternatives to current practice by state agencies in the U.S. are described that might provide for greater decentralization of these practices while maintaining institutional accountability.

  5. Coastal nonpoint pollution control program: Program development and approval guidance

    International Nuclear Information System (INIS)

    1993-01-01

    The document, developed by NOAA and EPA, contains guidance for states in developing and implementing their coastal nonpoint pollutant source programs. It describes the requirements that must be met, including: the geographic scope of the program; the pollutant sources to be addressed; the types of management measures used; the establishment of critical areas; technical assistance, public participation, and administrative coordination; and, the process for program submission and Federal approval. The document also contains the criteria by which NOAA and EPA will review the states' submissions

  6. 13 CFR 115.62 - Prohibition on participation in Prior Approval program.

    Science.gov (United States)

    2010-01-01

    ... Prior Approval program. 115.62 Section 115.62 Business Credit and Assistance SMALL BUSINESS... in Prior Approval program. A PSB Surety is not eligible to submit applications under subpart B of this part. This prohibition does not extend to an Affiliate, as defined in 13 CFR § 121.103, of a PSB...

  7. 30 CFR 906.10 - State regulatory program approval.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false State regulatory program approval. 906.10 Section 906.10 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO § 906.10 State...

  8. 77 FR 59879 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-10-01

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... ``Approved State Hazardous Waste Management Programs,'' Idaho's authorized hazardous waste program. The EPA... Federal Register, the EPA is codifying and incorporating by reference the State's hazardous waste program...

  9. IFNA approved Chinese Anaesthesia Nurse Education Program: A Delphi method.

    Science.gov (United States)

    Hu, Jiale; Fallacaro, Michael D; Jiang, Lili; Wu, Junyan; Jiang, Hong; Shi, Zhen; Ruan, Hong

    2017-09-01

    Numerous nurses work in operating rooms and recovery rooms or participate in the performance of anaesthesia in China. However, the scope of practice and the education for Chinese Anaesthesia Nurses is not standardized, varying from one geographic location to another. Furthermore, most nurses are not trained sufficiently to provide anaesthesia care. This study aimed to develop the first Anaesthesia Nurse Education Program in Mainland China based on the Educational Standards of the International Federation of Nurse Anaesthetists. The Delphi technique was applied to develop the scope of practice, competencies for Chinese Anaesthesia Nurses and education program. In 2014 the Anaesthesia Nurse Education Program established by the hospital applied for recognition by the International Federation of Nurse Anaesthetists. The Program's curriculum was evaluated against the IFNA Standards and recognition was awarded in 2015. The four-category, 50-item practice scope, and the three-domain, 45-item competency list were identified for Chinese Anaesthesia Nurses. The education program, which was established based on the International Federation of Nurse Anaesthetists educational standards and Chinese context, included nine curriculum modules. In March 2015, 13 candidates received and passed the 21-month education program. The Anaesthesia Nurse Education Program became the first program approved by the International Federation of Nurse Anaesthetists in China. Policy makers and hospital leaders can be confident that anaesthesia nurses graduating from this Chinese program will be prepared to demonstrate high level patient care as reflected in the recognition by IFNA of their adoption of international nurse anaesthesia education standards. Copyright © 2017 Elsevier Ltd. All rights reserved.

  10. 77 FR 46964 - Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-08-07

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... Agency (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. The EPA uses the regulations entitled ``Approved State Hazardous Waste Management...

  11. 77 FR 29231 - Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-05-17

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... Agency (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. The EPA uses the regulations entitled ``Approved State Hazardous Waste Management...

  12. 76 FR 26616 - Wisconsin: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2011-05-09

    ... Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection Agency (EPA... (RCRA) allows EPA to authorize States to operate their hazardous waste management programs in lieu of the Federal program. EPA uses the regulations entitled ``Approved State Hazardous Waste Management...

  13. 75 FR 17332 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2010-04-06

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... ``Approved State Hazardous Waste Management Programs,'' Idaho's authorized hazardous waste program. The EPA... regulations that are authorized and that the EPA will enforce under the Solid Waste Disposal Act, commonly...

  14. 14 CFR 121.407 - Training program: Approval of airplane simulators and other training devices.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Training program: Approval of airplane... Program § 121.407 Training program: Approval of airplane simulators and other training devices. (a) Each airplane simulator and other training device that is used in a training course permitted under § 121.409...

  15. Space Program Annual Report, For Approval

    International Nuclear Information System (INIS)

    TM Schaefer

    2004-01-01

    Knolls Atomic Power Laboratory (KAPL) (lead) has been requested by the Reference to create an unclassified report on the Prometheus Program's Jupiter Icy Moons Orbiter (JIMO) mission. This report is expected to be issued annually and be similar in level of content and scope to the NR Program's annual report ''The United States Naval Nuclear Propulsion Program'' (referred to as the Grey Book). The attachment to this letter provides a draft of the Prometheus Program report for NR review and approval. As stated in the Reference, a March 2005 issuance is planned following a coordinated NR Headquarter's review. The information contained in the attached report was obtained from open literature sources, NASA documents and Naval Reactors Program literature. The photographs contained in the report are drafts and their quality will be improved in the final version of the report. This report has been reviewed by the KAPL and Bettis Space Power Plant Staff and has been concurred with by the Manager of Space Power Plant (MJ Wollman) and the Manager of Bettis Reactor Engineering (C Eshelman)

  16. 30 CFR 906.15 - Approval of Colorado regulatory program amendments.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado regulatory program amendments. 906.15 Section 906.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO...

  17. 49 CFR 381.515 - May the FMCSA remove approved participants from a pilot program?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false May the FMCSA remove approved participants from a... § 381.515 May the FMCSA remove approved participants from a pilot program? The Administrator will... with the terms and conditions of the pilot program, or if continued participation is inconsistent with...

  18. Preparation for Early Termination of Ignalina NPP Operation

    International Nuclear Information System (INIS)

    Poskas, P.; Poskas, R.

    2003-01-01

    Seimas (Parliament of Lithuania) approved updated National Energy strategy where it is indicated that first Unit will be shutdown before the year 2005 and second Unit in 2009 if funding for decommissioning is available from EU and other donors. In accordance to Ignalina NPP Unit 1 Closure Law the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until year 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, o n the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned activities, licensing requirements for decommissioning, progress in preparation of the Final Decommissioning Plan is discussed

  19. The PACKTRAM database on national competent authorities' approval certificates for package design, special form material and shipment of radioactive material. User's guide for compiled system program

    International Nuclear Information System (INIS)

    1995-01-01

    The PACKTRAM system program enables Member States to prepare data diskettes on national competent authorities' approval certificates for package design, special form material and shipment of radioactive material, for submission to the IAEA, and facilitates data manipulation and report preparation for the IAEA. The system program is provided as a 424 kbyte executable file, for which this document is the User Guide. The system is fully menu-driven and requires an IBM-compatible personal computer with a minimum of 640 kbyte random access memory, a hard drive and one 3-1/2 inch diskette drive. 3 refs, 6 tabs

  20. 78 FR 38913 - National Organic Program: Request for an Extension of a Currently Approved Information Collection

    Science.gov (United States)

    2013-06-28

    ... essential to the integrity of the organic certification system. They create a paper trail that is a critical... States to establish their own organic certification programs after the programs are approved by the... date, one State organic certification program is approved by USDA. Certifying agents. Certifying agents...

  1. Pre-shipment preparations at the Savannah River Site - WSRC's technical basis to support DOE's approval to ship

    International Nuclear Information System (INIS)

    Thomas, Jay E.; Bickley, Donald W.; Conatser, E. Ray

    2000-01-01

    In the first four years of the Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Return Program following resumption of the SNF return program with the DOE-EIS ROD in May 1996, 13 shipments involving 77 casks with over 2,600 assemblies have been safely received and stored at the Savannah River Site (SRS). Each fuel type has gone through a rigorous pre-shipment preparation process that includes fuel characterization, criticality safety reviews, and operational reviews, culminating in the Department of Energy's (DOE's) authorization to ship. Ideally, the authorization to ship process should begin two years in advance of the fuel receipt with an agreement between the Department of Energy - Head Quarters (DOE-HQ) and the research reactor government on the conditions and protocol for the spent nuclear fuel return, with a target of DOE shipment authorization at least two months before facility loading. A visit by representatives from the Department of Energy - Savannah River (DOE-SR) and Westinghouse Savannah River Company (WSRC), DOE's Management and Operations (M and O) Contractor for the SRS, to the research reactor facility is then scheduled for the purpose of finalizing contractual arrangements (DOE-SR), facility assessments, and initial fuel inspections. An extensive effort is initiated at this time to characterize the fuel in a standard format as identified in the Appendix A attachment to the contract. The Appendix A must be finalized in an accurate and timely manner because it serves as the base reference document for WSRC and other involved stakeholders such as the cask owners and the competent authorities throughout the approval process. With the approval of the Appendix A, criticality safety reviews are initiated to evaluate the unloading and storage configurations. Operational reviews are conducted to allow for necessary adaptation of fuel handling facilities, procedures, and training. WSRC has proceduralized this process, 'Certification to Receive and

  2. 45 CFR 1388.5 - Program criteria-preparation of personnel.

    Science.gov (United States)

    2010-10-01

    ..., DEVELOPMENTAL DISABILITIES PROGRAM THE UNIVERSITY AFFILIATED PROGRAMS § 1388.5 Program criteria—preparation of personnel. (a) Introduction to preparation of personnel: UAP interdisciplinary training programs reflect... 45 Public Welfare 4 2010-10-01 2010-10-01 false Program criteria-preparation of personnel. 1388.5...

  3. 76 FR 28727 - Child Nutrition (CN) Labeling Program; Request for Extension and Revision of a Currently Approved...

    Science.gov (United States)

    2011-05-18

    ... (CN) Labeling Program; Request for Extension and Revision of a Currently Approved Information... INFORMATION: Title: Child Nutrition Labeling Program. OMB Number: 0581-0261 . Expiration Date of Approval: 3... collection. Abstract: The Child Nutrition (CN) Labeling Program is a voluntary technical assistance service...

  4. 76 FR 26681 - Wisconsin: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2011-05-09

    ... of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection Agency (EPA... Hazardous Waste Management Programs,'' Wisconsin's authorized hazardous waste program. EPA will incorporate... that are authorized and that the EPA will enforce under the Solid Waste Disposal Act, commonly referred...

  5. 76 FR 49787 - Rural Water Supply Program Approved Appraisal Reports; Availability

    Science.gov (United States)

    2011-08-11

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Rural Water Supply Program Approved Appraisal...: Reclamation provides assistance for appraisal investigations and feasibility studies for rural water supply... the findings and conclusions of the appraisal investigations that identified the water supply problems...

  6. The Relationships between Faculty Preparation Programs and Teaching Assistant Development Programs. Preparing Future Faculty. Occasional Paper No. 4.

    Science.gov (United States)

    Tice, Stacey Lane

    This paper examines the relationship between teaching assistant (TA) development programs and faculty preparation programs, the commonalities between the two types of program, and the issues to be considered when making the transition from the former to the latter. It notes that many institutions adopted TA training programs in the 1980s in…

  7. 77 FR 59758 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-10-01

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection..., (RCRA), allows the Environmental Protection Agency (EPA) to authorize State hazardous waste management... codification of the authorized Idaho hazardous waste management program and incorporates by reference...

  8. Directory of Certificates of Compliance for Radioactive Materials Packages: Report of NRC Approved Quality Assurance Programs for Radioactive Materials Packages

    International Nuclear Information System (INIS)

    1993-10-01

    This directory contains a Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Report of NRC Approved Quality Assurance Programs for Radioactive Materials Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on Quality Assurance Programs and Packagings which have been approved by the US Nuclear Regulatory Commission. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR section 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure themselves that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program

  9. Directory of certificates of compliance for radioactive materials packages: Summary report of NRC approved quality assurance programs for radioactive material packages

    International Nuclear Information System (INIS)

    1987-11-01

    This directory contains a Summary Report of the US Nuclear Regulatory Commission's Summary Report of NRC Approved Quality Assurance Programs (Volume 3) for Radioactive Material Packages effective October 1, 1987. This directory makes available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an alphabetical listing by Company name is included in the back of Volume 3 for approved QA programs. The Summary Reports include a listing of all users of each package design and approved QA programs prior to the publication date of the directory

  10. 40 CFR 145.31 - Approval process.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Approval process. 145.31 Section 145.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE UIC PROGRAM REQUIREMENTS Program Approval, Revision and Withdrawal § 145.31 Approval process. (a...

  11. Florida's Mandated Educational Leadership Program Redesign: The William Cecil Golden Touch

    Science.gov (United States)

    Mountford, Meredith; Acker-Hocevar, Michele A.

    2013-01-01

    In 2007, educational leadership programs in Florida were notified by Florida's Department of Education of a law requiring all programs to align with new legislation, State Rule 6A-5.081. Previously, most state-approved preparation programs were based on Florida's Leadership Preparation Standards, a version of the 1996 Interstate School Leadership…

  12. Directory of certificates of compliance for radioactive materials packages: Report of NRC approved quality assurance programs for radioactive material packages

    International Nuclear Information System (INIS)

    1988-12-01

    This directory contains a Report of the US Nuclear Regulatory Commission's Approved Packages (Volume 1), all Certificates of Compliance (Volume 2), and a Report of NRC Approved Quality Assurance Programs (Volume 3) for Radioactive Material Packages effective October 1, 1988. The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volume 2 of the directory. A listing by packaging types is included in the back of Volume 2. An alphabetical listing by Company name is included in the back of Volume 3 for approved QA programs. The Reports include a listing of all users of each package design and approved QA programs prior to the publication date of the directory

  13. 77 FR 11677 - Medicaid Program; Review and Approval Process for Section 1115 Demonstrations

    Science.gov (United States)

    2012-02-27

    ... for Medicare & Medicaid Services 42 CFR Part 431 Department of the Treasury 31 CFR Part 33 Department of Health and Human Services 45 CFR Part 155 Medicaid Program; Review and Approval Process for... Regulations#0;#0; [[Page 11678

  14. Preparing a Programmed Review in Accounting

    Science.gov (United States)

    Moore, Connie Remaly

    1975-01-01

    The programed review illustrated in this article was prepared for beginning accounting students to be used as a review of the basic accounting cycle before starting on the first practice set. (Author)

  15. Directory of Certificates of Compliance for Radioactive-Materials Packages. Summary report of NRC approved quality assurance programs for radioactive material packages

    International Nuclear Information System (INIS)

    1983-01-01

    This directory contains a Summary Report of the US Nuclear Regulatory Commission's Approved Packages (Volume I), all Certificates of Compliance (Volume 2), and Summary Report of NRC Approved Quality Assurance Programs (Volume 3) for Radioactive Material Packages effective December 31, 1982. The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the back of Volumes 1 and 2 of the directory. A listing by packaging types is included in the back of Volume 2. An alphabetical listing by Company name is included in the back of Volume 3 for approved QA programs. The Summary Reports include a listing of all users of each package design and approved QA programs prior to the publication date of the directory

  16. 78 FR 45231 - Medicare and Medicaid Programs; Initial Approval of Center for Improvement in Healthcare Quality...

    Science.gov (United States)

    2013-07-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services [CMS-3280-FN] Medicare and Medicaid Programs; Initial Approval of Center for Improvement in Healthcare Quality's (CIHQ's) Hospital Accreditation Program AGENCY: Centers for Medicare and Medicaid Services, HHS. ACTION: Final...

  17. 40 CFR 123.61 - Approval process.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Approval process. 123.61 Section 123... REQUIREMENTS Program Approval, Revision, and Withdrawal § 123.61 Approval process. (a) After determining that a...; and (6) Briefly outline the fundamental aspects of the State's proposed program, and the process for...

  18. 75 FR 56946 - Medicaid Program; Review and Approval Process for Section 1115 Demonstrations

    Science.gov (United States)

    2010-09-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services 42 CFR Part 431 [CMS-2325-P] RIN 0938-AQ46 Medicaid Program; Review and Approval Process for Section 1115 Demonstrations AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Proposed rule. SUMMARY: This...

  19. Evaluating the Effectiveness of Traditional and Alternative Principal Preparation Programs

    Science.gov (United States)

    Pannell, Summer; Peltier-Glaze, Bernnell M.; Haynes, Ingrid; Davis, Delilah; Skelton, Carrie

    2015-01-01

    This study sought to determine the effectiveness on increasing student achievement of principals trained in a traditional principal preparation program and those trained in an alternate route principal preparation program within the same Mississippi university. Sixty-six Mississippi principals and assistant principals participated in the study. Of…

  20. Criteria for approving equipment for continued operation

    International Nuclear Information System (INIS)

    Narayanan, T.V.

    1993-01-01

    In May 1988, the Pressure Vessel Research Committee (PVRC) of the Welding Research Council (WRC) initiated four projects in support of ASME's efforts to develop Codes and Standards for life prediction and life extension of nuclear and fossil power plant components. These projects are: (1) Criteria for Approving Equipment for Continued Operation (2) Guidelines and Procedures for Evaluating Piping for Continued Operation (3) Nondestructive Evaluation of Material Degradation (4) Operation and Maintenance History and Life Cycle Management. The PVRC awarded a contract to Foster Wheeler Development Corporation to undertake the first of these projects. The specific objective was to develop a program plan that will lead to development of ''Criteria for Approving Equipment for Continued Operation.'' The program is divided into the following four tasks: Task 1: Literature Search; Task 2: Telephone Interview and Consultation; Task 3: Program Plan Development; Task 4: Preparation of a Summary Report. This report is in fulfillment of the above project. As part of this study, the author reviewed about 145 reports, papers and books relating to various aspects of life extension. Various experts were also consulted who are involved in EPRI, NRC, ASME, PVRC, MPC, and utility studies as well as other research projects. The conclusions and recommendations for Code-related activities are summarized

  1. Long-term outcomes of the New Jersey nurse faculty preparation program scholars.

    Science.gov (United States)

    Gerolamo, Angela M; Conroy, Kara; Roemer, Grace; Holmes, Aline; Salmond, Susan; Polakowski, Jennifer

    Rising concerns over the capacity of nursing education to prepare enough nurses to meet population demand have received national attention. The Robert Wood Johnson Foundation implemented the New Jersey Nursing Initiative Faculty Preparation Program to address nursing workforce issues in New Jersey. This paper describes program and scholar outcomes and provides recommendations for nurse faculty development. This descriptive study uses data from scholar surveys and interviews with grantees. Findings suggest that a faculty preparation program that targets doctoral students and includes financial support, socialization to the faculty role, and formal education courses produces graduates who maintain a career in nursing education for up to three years after program completion. However, most master's-level students who also received formal preparation in nursing education were employed in clinical practice. Program developers must carefully consider the design of programs that integrate faculty preparation and advanced clinical training for master's-level students. Copyright © 2017 Elsevier Inc. All rights reserved.

  2. 75 FR 69660 - Cross-Media Electronic Reporting Rule State Authorized Program Revision Approval: State of Hawaii

    Science.gov (United States)

    2010-11-15

    ... Authorized Program Revision Approval: State of Hawaii AGENCY: Environmental Protection Agency (EPA). ACTION... Reporting, of the State of Hawaii's request to revise certain of its EPA-authorized programs to allow... meet the applicable subpart D requirements. On February 16, 2010, the State of Hawaii Department of...

  3. Directory of certificates of compliance for radioactive materials packages. Volume 3, Revision 14: Report of NRC approved quality assurance programs for radioactive materials packages

    International Nuclear Information System (INIS)

    1994-10-01

    This directory contains a Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Report of NRC Approved Quality Assurance Programs for Radioactive Materials Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on Quality Assurance Programs and Packagings which have been approved by the US Nuclear Regulatory Commission. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR section 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure themselves that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program

  4. 76 FR 31272 - Permanent Certification Program for Health Information Technology; Revisions to ONC-Approved...

    Science.gov (United States)

    2011-05-31

    ... Permanent Certification Program for Health Information Technology; Revisions to ONC-Approved Accreditor Processes AGENCY: Office of the National Coordinator for Health Information Technology (ONC), Department of... Coordinator for Health Information Technology (the National Coordinator) by section 3001(c)(5) of the Public...

  5. 78 FR 59701 - Medicare Program; Approval of Accrediting Organization for Suppliers of Advanced Diagnostic...

    Science.gov (United States)

    2013-09-27

    ...] Medicare Program; Approval of Accrediting Organization for Suppliers of Advanced Diagnostic Imaging... accredit suppliers seeking to furnish the technical component (TC) of advanced diagnostic imaging services... advanced diagnostic imaging (ADI) service and establish procedures to ensure that the criteria used by an...

  6. 78 FR 57857 - Medicare and Medicaid Programs; Application from the Compliance Team for Initial CMS-Approval of...

    Science.gov (United States)

    2013-09-20

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services [CMS-3287-PN] Medicare and Medicaid Programs; Application from the Compliance Team for Initial CMS-Approval of its Rural Health Clinic Accreditation Program AGENCY: Centers for Medicare and Medicaid Services, HHS. ACTION...

  7. Directory of certificates of compliance for radioactive materials packages: Report of NRC approved quality assurance programs for radioactive materials packages

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of compliance Number is included at the front of Volume 2 of the directory. A listing by packaging types is included in the back of Volume 2. An alphabetical listing by Company name is included in the back of Volume 3 for approved QA programs. The Reports include a listing of all users of each package design and approved QA programs prior to the publication date of the directory

  8. Directory of certificates of compliance for radioactive materials packages: Report of NRC approved quality assurance programs for radioactive materials packages

    International Nuclear Information System (INIS)

    1989-10-01

    The purpose of this directory is to make available a convenient source of information on packaging which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volume 2 of the directory. A listing by packaging types is included in the back of Volume 2. An alphabetical listing by Company name is included in the back of Volume 3 for approved QA programs. The Reports include a listing of all users of each package design and approved QA programs prior to the publication date of the directory

  9. 76 FR 72636 - Permanent Certification Program for Health Information Technology; Revisions to ONC-Approved...

    Science.gov (United States)

    2011-11-25

    ... Permanent Certification Program for Health Information Technology; Revisions to ONC-Approved Accreditor Processes AGENCY: Office of the National Coordinator for Health Information Technology (ONC), Department of... Coordinator for Health Information Technology by section 3001(c)(5) of the Public Health Service Act (PHSA) as...

  10. Mandated Preparation Program Redesign: Kentucky Case

    Science.gov (United States)

    Browne-Ferrigno, Tricia

    2013-01-01

    This case study presents a chronicle of events spanning a decade in Kentucky that led to state policy changes for principal preparation and details the response to those mandated changes by professors at the University of Kentucky. Professors' collaborative efforts resulted in a new teacher leadership program and redesigned principal certification…

  11. 75 FR 64393 - Approval of Noise Compatibility Program for Chicago Executive Airport, Prospect Heights and...

    Science.gov (United States)

    2010-10-19

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Approval of Noise Compatibility Program for Chicago Executive Airport, Prospect Heights and Wheeling, IL AGENCY: Federal Aviation Administration, DOT. ACTION: Notice. SUMMARY: The Federal Aviation Administration (FAA) announces its findings on...

  12. Learning to Teach a Blended Course in a Teacher Preparation Program

    Science.gov (United States)

    Kang, Jung Jin

    2014-01-01

    Teacher preparation programs have provided blended courses (a combination of online and face-to-face learning) for their students because of their availability and their convenience. Researchers need to understand how teacher educators perceive blended courses when they teach teacher candidates, because teacher preparation programs have different…

  13. Use of children's artwork to evaluate the effectiveness of a hospital preparation program.

    Science.gov (United States)

    Wilson, C J

    1991-01-01

    Approximately 1.5 million children are hospitalized on an emergency basis per year and are not able to be fully prepared for the event due to the emergency (Azarnoff & Woody, 1981). For this reason many pre-crisis hospital preparation programs are being instituted by hospitals and pediatric nurses. This pilot study investigated the use of children's artwork to evaluate the effectiveness of a hospital preparation program. The 6 to 10 year old children attending summer school at a day care center participated in a hospital preparation program. The purpose of the program was to decrease children's anxieties and fears in the event of an emergency hospitalization.

  14. Sexual Orientation Topics in Elementary Teacher Preparation Programs in the USA

    Science.gov (United States)

    Jennings, Todd; Sherwin, Gary

    2008-01-01

    This investigation is a descriptive study documenting the inclusion of sexual orientation (gay and lesbian) topics in a sample of 65 public university elementary teacher preparation programs across the USA (representing the preparation of 14,000-19,000 new teachers annually). Findings indicate that only 55.6% of programs address sexual orientation…

  15. 48 CFR 1819.7203 - Mentor approval process.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Mentor approval process... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7203 Mentor approval process. (a) An entity seeking to participate as a mentor must apply to the NASA Headquarters...

  16. Seeking Clarity in New Jersey for Leadership Preparation Program Design: Confusion, Fragility, and Unintended Consequences

    Science.gov (United States)

    Doolittle, Gini

    2013-01-01

    In 2004, the New Jersey Department of Education issued a mandate to the 17 leadership preparation program providers to revise their leadership preparation programs after completing a critical friends review. This case study explores the challenges, programmatic, and political experiences of one preparation program as state support dwindled.…

  17. Directory of Certificates of Compliance for radioactive materials packages: Report of NRC approved quality assurance programs for radioactive materials packages. Volume 3, Revision 15

    International Nuclear Information System (INIS)

    1995-10-01

    The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volumes 1 and 2. An alphabetical listing by user name is included in the back of Volume 3 of approved QA programs. The reports include a listing of all users of each package design and approved QA programs prior to the publication date

  18. Administrator Preparation for Multicultural Leadership: Inside Four Nationally Accredited Programs

    Science.gov (United States)

    Gardiner, Mary; Enomoto, Ernestine K.

    2004-01-01

    As accrediting associations and ISLLC Standards for School Leaders attest, school leaders have a critical role to insure equitable educational opportunities for diverse students. But how are they being prepared for multicultural leadership in administrator preparation programs? This qualitative study examined and contrasted four different…

  19. Directory of Certificates of Compliance for Radioactive Materials Packages. Summary Report of NRC Approved Quality Assurance Programs for Radioactive Material Packages. Volume 3. Revision 5

    International Nuclear Information System (INIS)

    1985-10-01

    This directory contains a Summary Report of the US Nuclear Regulatory Commission's Approved Packages (Volume I), all Certificates of Compliance (Volume 2), and Summary Report of NRC Approved Quality Assurance Programs (Volume 3) for Radioactive Material Packages effective October 1, 1985. The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the back of Volumes 1 and 2 of the directory. A listing by packaging types is included in the back of Volume 2. An alphabetical listing by Company name is included in the back of Volume 3 for approved QA programs. The Summary Reports include a listing of all users of each package design and approved QA programs prior to the publication date of the directory. Shipments of radioactive material utilizing these packages must be in accordance with the provisions of 49 CFR Section 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure themselves that they have a copy of the current approval and conduct their transportation activities in accordance with a Nuclear Regulatory Commission approved quality assurance program. Copies of the current approval may be obtained from the US Nuclear Regulatory Commission Public Document Room files (see Docket No. listed on each certificate) at 1717 H Street, Washington, DC 20555. Note that the general license of 10 CFR Section 71.12 does not authorize the receipt, possession, use or transfer of byproduct, source or special nuclear material; such authorization must be obtained pursuant to 10 CFR Parts 30 to 36, 40, or 70

  20. Career Preparation Program Curriculum Guide for: Hospitality/Tourism Industry (Food Services).

    Science.gov (United States)

    British Columbia Dept. of Education, Victoria. Curriculum Development Branch.

    This curriculum outline provides secondary and postsecondary instructors with detailed information on student learning outcomes for completion of the food services program requirements in the hospitality/tourism industry. A program overview discusses the aims of education; secondary school philosophy; and career preparation programs and their…

  1. MBA in Education Leadership: A Model for Developing an Interdisciplinary Principal Preparation Program

    Science.gov (United States)

    Smith, Rachel A.; Somers, John

    2016-01-01

    This paper presents a model for developing an interdisciplinary principal preparation program, an MBA in Education Leadership, which integrates best practices in both education and business within an educational context. The paper addresses gaps that exist in many traditional principal preparation programs and provides an alternative model, which…

  2. Hanford site guide for preparing and maintaining generator group pollution prevention program documentation

    International Nuclear Information System (INIS)

    1995-12-01

    This manual provides the necessary guidance to contractor generator groups for developing and maintaining documentation of their pollution prevention (P2) program activities. Preparation of program documentation will demonstrate compliance with contractor and U.S. Department of Energy (DOE) requirements, as well as state and federal regulations. Contractor waste generator groups are no longer required to prepare and update facility waste minimization plans. Developing and maintaining program documentation replace this requirement

  3. Accreditation in the Professions: Implications for Educational Leadership Preparation Programs

    Science.gov (United States)

    Pavlakis, Alexandra; Kelley, Carolyn

    2016-01-01

    Program accreditation is a process based on a set of professional expectations and standards meant to signal competency and credibility. Although accreditation has played an important role in shaping educational leadership preparation programs, recent revisions to accreditation processes and standards have highlighted attention to the purposes,…

  4. Feared, Forgotten, or Forbidden: Sexual Orientation Topics in Secondary Teacher Preparation Programs in the USA

    Science.gov (United States)

    Sherwin, Gary; Jennings, Todd

    2006-01-01

    This study examined the coverage of sexual orientation topics within 77 public university secondary teacher preparation programs across seven US states, and represented programs preparing 8,300-11,500 teachers annually. Findings indicated that 40% of programs did not address sexual orientation as a diversity topic. Further, even programs that did…

  5. Risk evaluation and mitigation strategies: a focus on the mycophenolic acid preparations.

    Science.gov (United States)

    Rostas, Sara; Kim, Miae; Gabardi, Steven

    2014-03-01

    To review risks associated with mycophenolic acid (MPA) preparations and evaluate their required risk evaluation and mitigation strategies (REMS) elements. Articles were identified through a non-date-limited MEDLINE and EMBASE search using the terms fetal toxicity, teratogenicity, risk evaluation and mitigation strategies, REMS, MPA, mycophenolate mofetil, entericcoated MPA, and organ transplant. Information from the Food and Drug Administration (FDA) and the manufacturers of the MPA preparations was also evaluated. The MPA preparations are associated with several potential risks, including gastrointestinal disturbances and myelosuppression; however, their impact on the fetus in pregnant patients taking 1 of these agents poses the greatest risk. The FDA approved REMS programs for all MPA products, both innovator and generic preparations, in September 2012. With evidence of increased risk of miscarriage and birth defects associated with MPA use, the FDA instituted a REMS program that contains both a medication guide and elements to assure safe use (ETASU). The medication guides for the MPA products, which were previously FDA approved, should continue to be distributed to patients who get either an initial prescription filled or a refill. The ETASU requires prescribers to complete training and obtain patient signatures on the Patient-Prescriber Acknowledgment Form. A single, national, voluntary pregnancy registry specific to this medication has been established, and pregnant patients should be encouraged to participate. Although the impact of the MPA REMS on clinical practice is not clear, it is a step toward increasing the understanding of fetal risks with MPA.

  6. 45 CFR 1340.13 - Approval of applications.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Approval of applications. 1340.13 Section 1340.13... NEGLECT PREVENTION AND TREATMENT PROGRAM CHILD ABUSE AND NEGLECT PREVENTION AND TREATMENT Grants to States § 1340.13 Approval of applications. (a) The Commissioner shall approve an application for an award for...

  7. Teachers' voices: A comparison of two secondary science teacher preparation programs

    Science.gov (United States)

    Kohlhaas Labuda, Kathryn

    This dissertation, using cross-case qualitative methodology, investigates the salient and latent features of two philosophically different university-based secondary science teacher preparation programs. Written documents from the two programs and from the Salish I Research project provided the salient data. New teachers' interview transcripts provided the latent data. This study provides the opportunity to hear teachers voice their perceptions of preparation programs. Three questions were investigated in this research study. First, What are the salient features of two different secondary science teacher preparation programs? Second, What are the latent features of two different secondary science teacher programs as perceived by new teachers? Third, How do new secondary science teachers from different programs perceive their preservice programs? The last question incorporates teachers' perceptions of gaps and coherence in the programs and teachers' recommendations to improve their preservice programs. Salient features of the programs revealed differences in the types of certification, and the amounts and types of required course work. Both programs certified teachers at the secondary science level, but only M program certified their teachers as elementary science specialists. Program M required more semester hours of education and science course work than Program S. Although teachers from both programs perceived little coherence between their science and education courses, S-teachers presented a more fragmented picture of their education program and perceived fewer benefits from the program. Lack of relevance and courses that focused on elementary teaching were perceived as part of the problem. M-teachers perceived some cohesion through the use of cohorts in three consecutive semesters of science methods courses that provided multiple field experiences prior to student teaching. S-teachers did not perceive an organized philosophy of their program. M

  8. Profile of Personnel Preparation Programs in Visual Impairment and Their Faculty

    Science.gov (United States)

    Ambrose-Zaken, Grace; Bozeman, Laura

    2010-01-01

    This survey of university personnel preparation programs in visual impairment in the United States and Canada investigated the demographic characteristics of faculty members and programs, instructional models, and funding formulas in 2007-08. It found that many programs used some form of distance education and that there was a correlation between…

  9. Income Tax Preparation Assistance Service Learning Program: A Multidimensional Assessment

    Science.gov (United States)

    Aldridge, Richard; Callahan, Richard A.; Chen, Yining; Wade, Stacy R.

    2015-01-01

    The authors present a multidimensional assessment of the outcomes and benefits of an income tax preparation assistance (ITPA) service learning program. They measure the perceived proximate benefits at the delivery of the service program, the actual learning outcome benefits prior to graduation, and the perceived long-term benefits from a…

  10. 9 CFR 316.5 - Branding ink; to be furnished by official establishments; approval by Program; color.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Branding ink; to be furnished by... THEIR CONTAINERS § 316.5 Branding ink; to be furnished by official establishments; approval by Program... purpose shall be used to apply ink brands bearing official marks to carcasses of cattle, sheep, swine, or...

  11. Longitudinal evaluation of a World Wide Web-based antimicrobial stewardship program: assessing factors associated with approval patterns and trends over time.

    Science.gov (United States)

    Venugopal, Vidya; Lehmann, Christoph U; Diener-West, Marie; Agwu, Allison L

    2014-02-01

    The Johns Hopkins Children's Medical and Surgery Center developed a Web-based Antimicrobial Stewardship Program (ASP) in 2005. The present study aimed to assess longitudinal antimicrobial request and approval patterns for this ASP. We analyzed a total of 16,229 antimicrobial requests for 3,542 patients between June 1, 2005, and June 30, 2009. Antimicrobial approval was the outcome of interest. We assessed gaming by studying trends in automatically approved requests. Nonparametric tests for trend were performed to detect changes in approval patterns. Multiple logistic regression was used to identify factors associated with approval. The vast majority (91.3%) of antimicrobial requests were approved, with an increase of 6.1% over time (P Web-based ASP allows management of a large number of antimicrobial requests, without apparent gaming. Observed differences in approval patterns based on patient, requestor, and antimicrobial factors may inform the development of ASPs and evaluation of provider education and training. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  12. Taiwan Teacher Preparation Program Evaluation: Some Critical Perspectives

    Science.gov (United States)

    Liu, Tze-Chang

    2015-01-01

    This paper focuses on the influences and changes of recent Taiwan teacher preparation program evaluation (TTPPE) as one of the national evaluation projects conducted by the Higher Education Evaluation and Accreditation Council of Taiwan. The main concerns are what kind of ideology is transformed through the policy by means of evaluation, and what…

  13. Teacher Education Reform in Urban Educator Preparation Programs

    Science.gov (United States)

    Banks, Tachelle

    2015-01-01

    The majority of teachers in the United States are of a different race, ethnicity, class, gender, and linguistic dominance from that of their students. Teachers are specifically challenged by a variety of racial and ethnic issues as they enter their classrooms. This paper discusses the importance of educator preparation programs devoting attention…

  14. Target developments program to prepare LMJ campaigns

    Energy Technology Data Exchange (ETDEWEB)

    Collier, R; Bachelet, F; Botrel, R; Breton, O; Chicanne, C; Dauteuil, C H; Durut, F; Fleury, E; Guillot, L; Hermerel, C; Jeannot, L; Legaie, O; Legay, G; Martin, M; Reneaume, B; Theobald, M; Vincent-Viry, O, E-mail: remy.collier@cea.f [Commissariat a l' Energie Atomique, Direction des Applications Militaires, Valduc, F-21120 Is-sur-Tille (France)

    2010-08-01

    To carry out laser plasma experiments on CEA laser facilities, a R and D program was set up and is still under way to deliver complex targets. For a decade, specific developments are also dedicated to 'Ligne d'Integration Laser' (LIL) in France and Omega facilities (USA). To prepare the targets intended for the first experiments on the Laser 'Megajoule' (LMJ) facility, new developments are required, such as cocktail hohlraum fabrication, gas barrier coating and foam shells developments. For fusion experiments on LMJ, an important program is also under way to elaborate the Cryogenic Target Assembly (CTA), to fill and transport the CTA and to study the conformation process of the DT layer.

  15. 48 CFR 2922.103-4 - Approvals.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Approvals. 2922.103-4 Section 2922.103-4 Federal Acquisition Regulations System DEPARTMENT OF LABOR SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Basic Labor Policies 2922.103-4 Approvals. The “agency...

  16. 38 CFR 21.7220 - Course approval.

    Science.gov (United States)

    2010-07-01

    ...) VOCATIONAL REHABILITATION AND EDUCATION All Volunteer Force Educational Assistance Program (Montgomery GI...; Pub. L. 98-525) (b) Course approval criteria. In administering benefits payable under 38 U.S.C...) Section 21.4265—Practical training approved as institutional training or on-job training; (10) Section 21...

  17. 49 CFR 1522.109 - TSA review and approval.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false TSA review and approval. 1522.109 Section 1522.109..., DEPARTMENT OF HOMELAND SECURITY SECURITY RULES FOR ALL MODES OF TRANSPORTATION TSA-APPROVED VALIDATION FIRMS AND VALIDATORS TSA-Approved Validation Firms and Validators for the Certified Cargo Screening Program...

  18. 49 CFR 1522.115 - Renewal of TSA approval.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Renewal of TSA approval. 1522.115 Section 1522.115..., DEPARTMENT OF HOMELAND SECURITY SECURITY RULES FOR ALL MODES OF TRANSPORTATION TSA-APPROVED VALIDATION FIRMS AND VALIDATORS TSA-Approved Validation Firms and Validators for the Certified Cargo Screening Program...

  19. 29 CFR 1952.157 - Changes to approved plan.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS North Carolina § 1952.157 Changes to approved plan. (a) Legislation. (1) On March 29, 1994, the Assistant Secretary approved North Carolina's... section 17 of the Act as amended on November 5, 1990. (2) [Reserved] (b) The Voluntary Protection Program...

  20. Preparing Youth for the 21st Century Knowledge Economy: Youth Programs and Workforce Preparation

    Science.gov (United States)

    Cochran, Graham R.; Ferrari, Theresa M.

    2009-01-01

    In the 21st century, the idea of preparing youth for the workforce has taken on new meaning. The shift to a knowledge economy has brought widespread concern that young people are entering the workforce without the skills employers value most, such as communication, critical thinking, leadership, and teamwork skills. As youth programs evaluate how…

  1. Current Conditions of Bilingual Teacher Preparation Programs in Public Universities in USA

    Science.gov (United States)

    Johannessen, B. Gloria Guzman; Thorsos, Nilsa; Dickinson, Gail

    2016-01-01

    This study addresses public universities' policies and practices in the USA (United States of America) with a focus on public bilingual teacher preparation in Spanish-English programs (initial credential licensure and Masters of Education programs with, or without, endorsements). We questioned: "What do bilingual programs look like in public…

  2. Teacher Education Preparation Program for the 21st Century. Which Way Forward for Kenya?

    Science.gov (United States)

    Katitia, David Melita Ole

    2015-01-01

    Teacher quality is always cited as the most significant efficiency of teacher preparation programs. This paper discusses the aspects of Teacher education factor that influences student achievement. There has always been an increased interest in examining the preparation program for the 21st century in Kenya and recommending the way forward for our…

  3. 7 CFR 1425.4 - Approval.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS COOPERATIVE MARKETING ASSOCIATIONS § 1425.4 Approval. (a) For a cooperative to gain CMA status to participate in a marketing assistance loan or Loan deficiency... prepared in accordance with generally accepted accounting principles; (3) A copy of the articles of...

  4. The Relationship Among Principal Preparation Programs, Professional Development, and Instructional Leadership Efficacy  

    OpenAIRE

    Thomas III, Harry R.

    2015-01-01

    This study presents a qualitative analysis of principals' perceptions of the relationship among principal preparation programs, professional development and instructional leadership confidence in one urban school division in Virginia. Levine (2005) argued that the principal has a salient effect on the instructional programs within schools, and the preparation and professional development of the principal affects the degree to which they maintain and improve instruction. To examine principal p...

  5. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Preparation of machines for inspection... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection...

  6. Career Preparation Program Curriculum Guide for: Hospitality/Tourism Industry (Tourist Services).

    Science.gov (United States)

    British Columbia Dept. of Education, Victoria. Curriculum Development Branch.

    This career preparation curriculum outline for the hospitality/tourism industry is intended to provide secondary and postsecondary learning outcomes for completion of program requirements. The guide is organized into four sections. Section one presents an overview of the program, of the philosophy of career education, and of the organization and…

  7. 78 FR 12234 - Promotions and Incentive Programs for First-Class Mail and Standard Mail

    Science.gov (United States)

    2013-02-22

    ... No. R2013-1) on October 11, 2012 to offer six new promotions in 2013 and the PRC approved the 2013... Promotional Programs The six promotional programs, in calendar order are: 1. Direct Mail Mobile Coupon and... preparer in the by/for fields. Full-service mailings are limited to 9,999 pieces if submitted via Postal...

  8. 33 CFR 385.13 - Projects implemented under additional program authority.

    Science.gov (United States)

    2010-07-01

    ... Implementation Report is prepared and approved in accordance with § 385.26; and (3) Not exceed a total cost of... RESTORATION PLAN CERP Implementation Processes § 385.13 Projects implemented under additional program authority. (a) To expedite implementation of the Plan, the Corps of Engineers and non-Federal sponsors may...

  9. Safety review and approval process for the TFTR

    International Nuclear Information System (INIS)

    Levine, J.D.; Howe, H.J.; Howe, K.E.

    1983-01-01

    The design, construction, and operation of the Tokamak Fusion Test Reactor (TFTR) has undergone an extensive safety and enviromental analysis involving Princeton Plasma Physics Laboratory (PPPL), the U.S. Department of Energy (DOE), the Ebasco/Grumman Industrial Subcontractor Team, and other organizations. This analysis, which is continuing during the TFTR operational phase, has been facilitated by the preparation, review and approval of several documents, including an Environmental Statement (Draft and Final), a Preliminary Safety Analysis Report (PSAR), a Final Safety Analysis Report (FSAR), Operations Safety Requirements (OSRs) and Safety Requirements (SRs), and various Operating and Maintenance Manuals. Through TFTR Safety Group participation in formal system design evaluations, change control boards, and reviews of project procurement and installation documentation, the TFTR Management Configuration Control System assures that all aspects of the project, including proposed design, installation and operational changes, receive prompt and thorough safety analyses. These efforts will continue as the TFTR Program moves into the neutral beam and D-T operational phases. The safety review and approval experience that has been acquired on the TFTR Project should serve as a foundation for similar efforts on future fusion devices

  10. Quality assurance program preparation - review of requirements and plant systems - selection of program levels

    International Nuclear Information System (INIS)

    Asmuss, G.

    1980-01-01

    The establishment and implementation for a practicable quality assurance program for a nuclear power plant demands a detailed background in the field of engineering, manufacturing, organization and quality assurance. It will be demonstrated with examples to define and control the achievement of quality related activities during the phases of design, procurement, manufactoring, commissioning and operation. In general the quality assurance program applies to all items, processes and services important to safety of nuclear power plant. The classification for safety related and non-safety related items and services demonstrate the levels of quality assurance requirements. The lecture gives an introduction of QA Program preparation under the following topics: -Basic criteria and international requirements - Interaction of QA activities - Modular and product oriented QA programs - Structuring of organization for the QA program - Identification of the main quality assurance functions and required actions - Quality Assurance Program documentation - Documentation of planning of activities - Control of program documents - Definitions. (orig./RW)

  11. 47 CFR 400.5 - Approval and award.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Approval and award. 400.5 Section 400.5 Telecommunication NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION, DEPARTMENT OF COMMERCE, AND NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION E-911 GRANT PROGRAM § 400.5 Approval...

  12. Early experience in establishing and evaluating an ACGME-approved international general surgery rotation.

    Science.gov (United States)

    Tarpley, Margaret; Hansen, Erik; Tarpley, John L

    2013-01-01

    In 2011, the Accreditation Council for Graduate Medical Education Surgery Residency Review Committee first provided guidelines for elective international general surgery rotations. The Vanderbilt general surgery residency program received Surgery Residency Review Committee approval for a fourth-year elective in Kenya beginning in the 2011-2012 academic year. Because this rotation would break ground culturally and geographically, and as an educational partnership, a briefing and debriefing process was developed for this ground-breaking year. Our objectives were to prepare residents to maximize the experience without competing for cases with local trainees or overburdening the host institution and to perform continuous quality assessment and improvement as each resident returned back. Briefing included health protection strategies, a procedures manual containing step-by-step preparation activities, and cultural-sensitivity training. Institutional Review Board exemption approval was obtained to administer a questionnaire created for returning residents concerning educational value, relations with local trainees, physical environment, and personal perceptions that would provide the scaffold for the debriefing conference. The questionnaire coupled with the debriefing discussion for the first 9 participants revealed overall satisfaction with the rotation and the briefing process, good health, and no duty hours or days-off issues. Other findings include the following: (1) emotional effect of observing African families weigh cost in medical decision making; (2) satisfactory access to educational resources; (3) significant exposure to specialties such as urology and radiology; and (4) toleration of 4 weeks as a single and expressed need for leisure activity materials such as books, DVDs, or games. The responses triggered adjustments in the briefing sessions and travel preparation. The host institution invited the residents to return for the 2012-2013 year as well as 2013

  13. Effects of three types of retirement preparation program : A qualitative study of civil servants in Brazil

    NARCIS (Netherlands)

    Leandro-Franca, Cristineide; Van Solinge, Hanna; Henkens, Kene; Murta, Sheila Giardini

    2016-01-01

    Studies on the effectiveness of retirement planning programs are relatively scarce. Retirement preparation and planning programs may assist individuals to smooth the transition to retirement and subsequent adjustment. This qualitative study examines the effects of three retirement preparation

  14. Physical Education Preservice Teachers' Perceptions About Preparation for Comprehensive School Physical Activity Programs.

    Science.gov (United States)

    Kwon, Ja Youn; Kulinna, Pamela Hodges; van der Mars, Hans; Koro-Ljungberg, Mirka; Amrein-Beardsley, Audrey; Norris, Jason

    2018-06-01

    Physical educators may be the responsible people for implementing comprehensive school physical activity programs (CSPAPs) in schools. However, it is unclear whether physical education teacher education (PETE) programs provide the relevant learning opportunities to preservice teachers for CSPAP implementation. The purpose of this study was to understand preservice teachers' perspectives and experiences of CSPAP preparation in their PETE programs. Fourteen PETE students from 6 different universities participated and shared their experiences in PETE programs. Data were collected through a short survey, 1 formal interview, field images, document gathering, and an additional survey to follow up the interview. Descriptive statistics, constant comparison, and analytic induction techniques were used to analyze the data. Participants' familiarity with CSPAPs was related to positive opinions about the role of physical educators in CSPAPs. Three common themes were revealed: (a) introducing CSPAP via courses, (b) the lack of programwide hands-on experiences for CSPAP, and (c) limited preparation for social skills with stakeholders. Participants' perceptions of the role of physical educators as physical activity leaders had been expanded during their training. The participating PETE programs integrated CSPAP components in the existing courses to introduce CSPAP, while there was a lack of sufficient practical opportunities to learn how to implement (aspects of) a CSPAP. Participants felt they were insufficiently prepared to promote and implement expanded physical activity programming beyond physical education classes in schools. The majority of the PETE preservice teachers wanted more practical CSPAP experiences in their programs.

  15. Investigating the Availability of Quality Assurance Standards of Academic Programs in the Music Teacher Preparation Program- University of Jordan, from the Students’ Perspective

    Directory of Open Access Journals (Sweden)

    Nedal M. Nsairat

    2017-08-01

    Full Text Available This study aimed to find out how far quality assurance standards were applied in the music teacher preparation program at the University of Jordan, from the viewpoint of the students enrolled in the same program. The population of this study consisted of all the students (53 enrolled in the program , and majoring in music education and music performance. The study followed a descriptive analytical approach to collect the data. The study results revealed the extent of relevance of the BA program of preparing music teachers in the University of Jordan, which came as a result of applying each quality assurance standard in the program except the standard of facilities and equipment. In light of the findings, the study recommended that all those in charge of the educational process should pay more heed to certification programs of music teacher education. This should be done by designing and implementing programs to support this type of program, so as to be in conformity with quality assurance standards of music teacher education. Keywords: Preparation , Music teacher education , Standard , Quality assurance.

  16. International Academy of Astronautics 5th cosmic study--preparing for a 21st century program of integrated, Lunar and Martian exploration and development (executive summary).

    Science.gov (United States)

    Koelle, H H; Stephenson, D G

    2003-04-01

    This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector. c2002 Elsevier Science Ltd. All rights reserved.

  17. 13 CFR 108.140 - SBA approval of initial Management Expenses.

    Science.gov (United States)

    2010-01-01

    ... VENTURE CAPITAL (âNMVCâ) PROGRAM Qualifications for the NMVC Program Organizing A Nmvc Company § 108.140 SBA approval of initial Management Expenses. A NMVC Company must have its Management Expenses approved by SBA at the time of designation as a NMVC Company. (See § 108.520 for the definition of Management...

  18. Integrating Professional Development into STEM Graduate Programs: Student-Centered Programs for Career Preparation

    Science.gov (United States)

    Lautz, L.; McCay, D.; Driscoll, C. T.; Glas, R. L.; Gutchess, K. M.; Johnson, A.; Millard, G.

    2017-12-01

    Recognizing that over half of STEM Ph.D. graduates are finding work outside of academia, a new, NSF-funded program at Syracuse University, EMPOWER (or Education Model Program on Water-Energy Research) is encouraging its graduate students to take ownership of their graduate program and design it to meet their anticipated needs. Launched in 2016, EMPOWER's goal is to prepare graduate students for careers in the water-energy field by offering targeted workshops, professional training coursework, a career capstone experience, a professional development mini-grant program, and an interdisciplinary "foundations" seminar. Through regular student feedback and program evaluation, EMPOWER has learned some important lessons this first year: career options and graduate students' interests are diverse, requiring individualized programs designed to meet the needs of prospective employers and employees; students need exposure to the range of careers in their field to provide a roadmap for designing their own graduate school experience; effective programs nurture a culture that values professional development thereby giving students permission to pursue career paths and professional development opportunities that meet their own needs and interests; and existing university resources support the effective and efficient integration of professional development activities into graduate programs. Many of the positive outcomes experienced by EMPOWER students may be achieved in departmental graduate programs with small changes to their graduate curricula.

  19. Retaining undergrads, and preparing grads for academic jobs: the PFPF program

    Science.gov (United States)

    Stewart, Gay

    2001-04-01

    When we embarked upon an NSF supported curriculum development project, it became clear that the greatest need for educational reform to be sustained was for future faculty to be prepared to be as professional about roles as educators as roles as researchers. A new faculty member may find themselves preparing to teach a class for the first time, with little guidance. Complaints employers have about those hired for research positions involve interpersonal skills. More researchers are being called upon to do outreach. Teaching and outreach activities develop these skills. We are adding these kinds of activities to the graduate program, with the same sort of mentoring that accompanies the development of research skills, without extending the time to degree. Also, a new MA for those that find themselves unmotivated by research, but still loving physics, provides a route straight into teaching at very low resource cost. These interests helped us become one of four pilot sites for the Preparing Future Physics Faculty program. The early results of our efforts will be presented: increased undergraduate enrollment and satisfaction with the departmental climate, recognition from the university administration for doing a superior job in student preparation, and graduate students more comfortable in the classroom.

  20. The Teaching of the Code of Ethics and Standard Practices for Texas Educator Preparation Programs

    Science.gov (United States)

    Davenport, Marvin; Thompson, J. Ray; Templeton, Nathan R.

    2015-01-01

    The purpose of this descriptive quantitative research study was to answer three basic informational questions: (1) To what extent ethics training, as stipulated in Texas Administrative Code Chapter 247, was included in the EPP curriculum; (2) To what extent Texas public universities with approved EPP programs provided faculty opportunities for…

  1. The Purpose of a Student Affairs Preparation Program within Jesuit Higher Education

    Science.gov (United States)

    Stringer, Jeremy; Swezey, Erin

    2006-01-01

    This article addresses the congruence of a student affairs professional preparation program within Jesuit higher education. It connects the mission of Jesuit education and Jesuit religious and educational principles to the philosophy of student affairs work in colleges and universities. A program in student development administration at Seattle…

  2. Preparation of medicines for children - a hierarchy of classification.

    Science.gov (United States)

    Ernest, Terry B; Craig, Jo; Nunn, Anthony; Salunke, Smita; Tuleu, Catherine; Breitkreutz, Joerg; Alex, Rainer; Hempenstall, John

    2012-10-05

    There is some confusion about the types of paediatric pharmaceutical preparation (in a regulatory and pharmaceutical development context) that are acceptable for approval by medicines regulators. Some of the confusion relates to terminology which may mean different things to different stakeholders. It may not always be possible to provide authorised, commercially manufactured, age appropriate, ready-to-administer preparations. In terms of assurance of quality and bioavailability there is a continuum from this ideal through intermediate products through authorised compounding and manipulation of commercial dosage forms to ad hoc compounding using only the skills and experience of the individual pharmacist. Additionally, it is widely known that caregivers may manipulate medicines at home, for example by segmenting tablets and by addition to foods or liquids. The first intent of the manufacturer should be to provide for children an age appropriate, ready-to-administer preparation which is commercially manufactured and approved by the competent authorities. However, there will still be a place for providing other age appropriate preparations such as approved products that are 'intermediates' requiring reconstitution before use, or instructions for compounding or manipulation of a dosage form. If compounding or manipulation is likely to be required it is preferable that data are generated by Industry, approved by the competent authorities and provided in the Summary of Product Characteristics (SmPC). It is acknowledged however, that ad hoc compounding or manipulation may also take place in certain circumstances such as logistical difficulties or to satisfy the needs of the child who does not find the authorised product to be 'age appropriate'. This paper explores compounding and manipulation of medicines in relation to approval by medicines regulators and non-approved preparation to fulfil the needs of the individual patient. Definitions are proposed to provide a

  3. The Relationship between a College Preparation Program and At-Risk Students' College Readiness

    Science.gov (United States)

    Cates, Jennifer T.; Schaefle, Scott E.

    2011-01-01

    This study evaluates the relationship between elements of a college preparation program and the college readiness of low-income and/or Latina/o students at the completion of 6 years of participation in the program. Hours of participation in tutoring, mentoring, advising, college campus visits, summer programs, and educational field trips are…

  4. Meeting the Pepsi Challenge: Preparing Evaluation Programs for Scholastic Improvement.

    Science.gov (United States)

    Hopkins, Mona S.

    This document provides guidelines for preparing evaluation programs for scholastic improvement. The philosophy underlying assessment and accountability is discussed, with specific reference to the positive and negative aspects of assessment. The design of a curriculum evaluation model is presented, including goal identification, data gathering,…

  5. Improving Science Teacher Preparation through the APS PhysTEC and NSF Noyce Programs

    Science.gov (United States)

    Williams, Tasha; Tyler, Micheal; van Duzor, Andrea; Sabella, Mel

    2013-03-01

    Central to the recruitment of students into science teaching at a school like CSU, is a focus on the professional nature of teaching. The purpose of this focus is twofold: it serves to change student perceptions about teaching and it prepares students to become teachers who value continued professional development and value the science education research literature. The Noyce and PhysTEC programs at CSU place the professional nature of teaching front and center by involving students in education research projects, paid internships, attendance at conferences, and participation in a new Teacher Immersion Institute and a Science Education Journal Reading Class. This poster will focus on specific components of our teacher preparation program that were developed through these two programs. In addition we will describe how these new components provide students with diverse experiences in the teaching of science to students in the urban school district. Supported by the NSF Noyce Program (0833251) and the APS PhysTEC Program.

  6. 42 CFR 102.73 - Approval of benefits.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Approval of benefits. 102.73 Section 102.73 Public... PROGRAM Secretarial Determinations § 102.73 Approval of benefits. When the Secretary has determined that benefits will be paid to a requester and has calculated the type and amount of such benefits, he will...

  7. 42 CFR 8.6 - Withdrawal of approval of accreditation bodies.

    Science.gov (United States)

    2010-10-01

    ... PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Accreditation § 8.6 Withdrawal of approval of... 42 Public Health 1 2010-10-01 2010-10-01 false Withdrawal of approval of accreditation bodies. 8.6... to establish that the problems that were grounds for withdrawal of approval have been resolved. (2...

  8. Deaf Education Teacher Preparation: A Phenomenological Case Study of a Graduate Program with a Comprehensive Philosophy

    Science.gov (United States)

    Engler, Karen S.; MacGregor, Cynthia J.

    2018-01-01

    At a time when deaf education teacher preparation programs are declining in number, little is known about their actual effectiveness. A phenomenological case study of a graduate-level comprehensive deaf education teacher preparation program at a midwestern university explored empowered and enabled learning of teacher candidates using the Missouri…

  9. Quality assurance program for nuclear power plants

    International Nuclear Information System (INIS)

    Gamon, T.H.

    1976-02-01

    The Topical Report presented establishes and provides the basis for the Brown and Root Quality Assurance Program for Nuclear Power Plants from which the Brown and Root Quality Assurance Manual is prepared and implemented. The Quality Assurance Program is implemented by the Brown and Root Power Division during the design, procurement, and construction phases of nuclear power plants. The Brown and Root Quality Assurance Program conforms to the requirements of Nuclear Regulatory Commission Regulation 10 CFR 50, Appendix B; to approved industry standards such as ANSI N45.2 and ''Daughter Standards''; or to equivalent alternatives as indicated in the appropriate sections of the report

  10. Quality assurance program for nuclear power plants

    International Nuclear Information System (INIS)

    Gamon, T.H.

    1976-06-01

    This topical report establishes and provides the basis for the Brown and Root Quality Assurance Program for Nuclear Power Plants from which the Brown and Root Quality Assurance Manual is prepared and implemented. The Quality Assurance Program is implemented by the Brown and Root Power Division during the design, procurement, and construction phases of nuclear power plants. The Brown and Root Quality Assurance Program conforms to the requirements of Nuclear Regulatory Commission Regulation 10 CFR 50, Appendix B; to approved industry standards such as ANSI N45.2 and ''Daughter Standards''; or to equivalent alternatives as indicated in the appropriate sections of this report

  11. Influences of Teacher Preparation Program on Preservice Science Teachers' Beliefs

    Science.gov (United States)

    Nuangchalerm, Prasart; Prachagool, Veena

    2010-01-01

    Teacher preparation program is routinely make decisions regarding the best pedagogical methods from field experience studies, it can alter students' understandings about academic content and some characteristics through professional practices. This study tries to investigate the extent to which individuals learning to be teachers feel what…

  12. Directory of certificates of compliance for radioactive materials packages. Summary report of NRC approved quality assurance programs for radioactive material packages. Volume 3, Revision 4

    International Nuclear Information System (INIS)

    1984-11-01

    This directory contains a Summary Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Summary Report of NRC Approved Quality Assurance Programs for Radioactive Material Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program. Copies of the current approval may be obtained from the US Nuclear Regulatory Commission Public Document Room files (see Docket No. listed on each certificate) at 1717 H Street, Washington, DC 20555. Note that the general license of 10 CFR 71.12 does not authorize the receipt, possession, use or transfer of byproduct source, or special nuclear material; such authorization must be obtained pursuant to 10 CFR Parts 30 to 36, 40, 50, or 70

  13. 7 CFR 4290.510 - Approval of RBIC's Investment Adviser/Manager.

    Science.gov (United States)

    2010-01-01

    ... INVESTMENT COMPANY (âRBICâ) PROGRAM Managing the Operations of a RBIC Management and Compensation § 4290.510... approval of the management contract. Approval of an Investment Adviser/Manager for one RBIC does not... 7 Agriculture 15 2010-01-01 2010-01-01 false Approval of RBIC's Investment Adviser/Manager. 4290...

  14. 44 CFR 78.9 - Planning grant approval process.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  15. Alternative Teacher Preparation Programs. Title II News You Can Use

    Science.gov (United States)

    Office of Postsecondary Education, US Department of Education, 2015

    2015-01-01

    Title II of the "Higher Education Act of 1965" ("HEA"), as amended in 2008 by the "Higher Education Opportunity Act," requires states to report annually on key elements of their teacher preparation programs and requirements for initial teacher credentialing, kindergarten through 12th grade. "Title II News You Can…

  16. 7 CFR 1735.90 - Preliminary approvals.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE GENERAL POLICIES, TYPES OF LOANS, LOAN REQUIREMENTS-TELECOMMUNICATIONS PROGRAM Requirements for... franchises, licenses, and permits; (4) All required regulatory body approvals; (5) All required corporate...

  17. Approved reference and testing materials for use in Nuclear Waste Management Research and Development Programs

    International Nuclear Information System (INIS)

    Mellinger, G.B.; Daniel, J.L.

    1984-12-01

    This document, addressed to members of the waste management research and development community summarizes reference and testing materials available from the Nuclear Waste Materials Characterization Center (MCC). These materials are furnished under the MCC's charter to distribute reference materials essential for quantitative evaluation of nuclear waste package materials under development in the US. Reference materials with known behavior in various standard waste management related tests are needed to ensure that individual testing programs are correctly performing those tests. Approved testing materials are provided to assist the projects in assembling materials data base of defensible accuracy and precision. This is the second issue of this publication. Eight new Approved Testing Materials are listed, and Spent Fuel is included as a separate section of Standard Materials because of its increasing importance as a potential repository storage form. A summary of current characterization information is provided for each material listed. Future issues will provide updates of the characterization status of the materials presented in this issue, and information about new standard materials as they are acquired. 7 references, 1 figure, 19 tables

  18. FFTF operations procedures preparation guide. Revision 2

    International Nuclear Information System (INIS)

    1976-12-01

    The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3

  19. A Study Examining the Dimensionality of Core Competencies Measure in Teacher Preparation Programs: Challenges and Lessons

    Science.gov (United States)

    Kizil, Ruhan Circi; Briggs, Derek; Seidel, Kent; Green, Kathy

    2014-01-01

    The evidence that teacher preparation programs have an impact on teacher quality is often limited. Progress in research on this topic will remain rather limited in its influence on practice until more proximal measures of teacher education outcomes can be established. The dearth of variables to measure the impact of teacher preparation programs on…

  20. Social Justice Leadership as Praxis: Developing Capacities through Preparation Programs

    Science.gov (United States)

    Furman, Gail

    2012-01-01

    Purpose: The purpose of this article is to propose a conceptual framework for social justice leadership as praxis and to explore the implications of this framework for leadership preparation programs. Conceptual Argument: The conceptual framework for social justice leadership is grounded in a review of literature and organized around three central…

  1. IRT‑Sofia, HEU to LEU conversion: regulatory approval tasks solution overview

    International Nuclear Information System (INIS)

    Mitev, Mladen; Belousov, Sergey; Dimitrov, Dobromir

    2014-01-01

    The HEU to LEU conversion of the IRT–Sofia research reactor of the Institute for Nuclear Research and Nuclear Energy of the Bulgarian Academy of Sciences was jointly studied with the Argonne National Laboratory as a part of the RERTR Programme. The main purpose of the collaboration consisted in accomplishment of safety analyses and preparation of documents used for regulatory approval tasks solution. The main steps and results which are fundamental for the preparation of IRT–Sofia Safety Analyses Report including Operating Limits and Conditions are presented in this paper. The documents prepared by INRNE in accordance with the European nuclear safety requirements and IAEA recommendations were submitted for approval to the Bulgarian Nuclear Regulatory Agency at the end of 2010. Key words: research reactor, safety analyses report, Nuclear Regulatory Agency

  2. Rallying the troops: a four-step guide to preparing a residency program for short-term weather emergencies.

    Science.gov (United States)

    Chow, Grant V; Hayashi, Jennifer; Hirsch, Glenn A; Christmas, Colleen

    2011-04-01

    Weather emergencies present a multifaceted challenge to residents and residency programs. Both the individual trainee and program may be pushed to the limits of physical and mental strain, potentially jeopardizing core competencies of patient care and professionalism. Although daunting, the task of preparing for these events should be a methodical process integrated into every residency training program. The core elements of emergency preparation with regard to inpatient services include identifying and staffing critical positions, motivating residents to consider the needs of the group over those of the individual, providing for basic needs, and planning activities in order to preserve team morale and facilitate recovery. The authors outline a four-step process in preparing a residency program for an anticipated short-term weather emergency. An example worksheet for emergency planning is included. With adequate preparation, residency training programs can maintain the highest levels of patient care, professionalism, and esprit de corps during weather emergencies. When managed effectively, emergencies may present an opportunity for professional growth and a sense of unity for those involved.

  3. Directory of certificates of compliance for radioactive materials packages. Summary report of NRC approved quality assurance programs for radioactive material packages. Volume 3, Revision 6

    International Nuclear Information System (INIS)

    1986-10-01

    This directory contains a Summary Report of NRC Approved Packages (Volumes 1), Certificates of Compliance (Volume 2), and a Summary Report of NRC Approved Quality Assurance Programs for Radioactive Material Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure them that have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program. Copies of the current approval may be obtained from the US Nuclear Regulatory Commission Public Document Room files (see Docket No. listed on each certificate) at 1717 H Street, Washington, DC 20555. Note that the general license of 10 CFR 71.12 does not authorize the receipt, possession, use of transfer of byproduct source, or special nuclear material; such authorization must be obtained pursuant to 10 CFR Parts 30 to 36, 40, 50, or 70

  4. A guide for approval of nuclear gauging devices

    International Nuclear Information System (INIS)

    1990-01-01

    This guide has been written to assist manufacturers, distributors and users of nuclear gauging devices in the preparation of a submission to the Atomic Energy Control Board in support of a request for approval of a nuclear gauging device

  5. Project W-521, waste feed delivery systems environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities

  6. Characteristics of Teachers Nominated for an Accelerated Principal Preparation Program

    Science.gov (United States)

    Rios, Steve J.; Reyes-Guerra, Daniel

    2012-01-01

    This article reports the initial evaluation results of a new accelerated, job-embedded principal preparation program funded by a Race to the Top Grant (U.S. Department of Education, 2012a) in Florida. Descriptive statistics, t-tests, and chi-square analyses were used to describe the characteristics of a group of potential applicants nominated to…

  7. Streamlining of the Decontamination and Demolition Document Preparation Process

    International Nuclear Information System (INIS)

    Durand, Nick; Meincke, Carol; Peek, Georgianne

    1999-01-01

    During the past five years, the Sandia National Labo- ratories Decontamination, Decommissioning, Demolition, and Reuse (D3R) Program has evolved and become more focused and efficient. Historical approaches to project documentation, requirements, and drivers are discussed detailing key assumptions, oversight authority, and proj- ect approvals. Discussion of efforts to streamline the D3R project planning and preparation process include the in- corporation of the principles of graded approach, Total Quality Management, and the Observational Method (CH2MHILL April 1989).1 Process improvements were realized by clearly defining regulatory requirements for each phase of a project, establishing general guidance for the program and combining project-specific documents to eliminate redundant and unneeded information. Proc- ess improvements to cost, schedule, and quality are dis- cussed in detail for several projects

  8. 75 FR 56663 - Agency Information Collection (Quarterly Report of State Approving Agency Activities); Activity...

    Science.gov (United States)

    2010-09-16

    ... a currently approved collection. Abstract: VA reimburses State Approving Agencies (SAAs) for expenses incurred in the approval and supervision of education and training programs. SAAs are required to...

  9. Directory of certificates of compliance for radioactive materials packages: summary report of NRC approved quality-assurance programs for radioactive-material packages. Volume 3, Revision 3

    International Nuclear Information System (INIS)

    1983-09-01

    This directory contains a Summary Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Summary Report of NRC Approved Quality Assurance Programs for Radioactive Material Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure them in accordance with an NRC approved quality assurance program. Copies of the current approval may be obtained from the US Nuclear Regulatory Commission Public Document Room files (see Docket No. listed on each certificate) at 1717 H Street, Washington, DC 20555. Note that the general license of 10 CFR 71.12 does not authorize the receipt, possession, use or transfer of byproduct source, or special nuclear material; such authorization must be obtained pursuant to 10 CFR Parts 30 to 36, 40, 50, or 70

  10. A Comparative Study of Leadership Preparation Programs in Gama (Brazil) and the United States

    Science.gov (United States)

    Borges-Gatewood, Mara Rubia Fonseca; McNeal, Larry

    2013-01-01

    The objective of the study was to determine the relationship, if any, between leadership preparation programs types and how well school administrators are prepared to set a widely shared vision, develop a school culture, effectively manage school operations and resources, collaborate with faculty and community members, act with integrity and…

  11. Curricular Abstinence: Examining Human Sexuality Training in School Counselor Preparation Programs

    Science.gov (United States)

    Behun, Richard Joseph; Cerrito, Julie A.; Delmonico, David L.; Campenni, Estelle

    2017-01-01

    Professional school counselors (PSCs; N = 486) rated their level of perceived preparedness acquired in their school counselor preparation program with respect to knowledge, skills, and self-awareness of five human sexuality domains (behavior, health, morality, identity, violence) across grade level (elementary vs. secondary) and three human…

  12. Directory of certificates of compliance for radioactive materials packages. Volume 3, revision 1. Summary report of NRC approved quality assurance programs for radioactive material packages

    International Nuclear Information System (INIS)

    1981-12-01

    The directory contains a Summary Report of NRC approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Summary Report of NRC Approved Quality Assurance Programs for Radioactive Material Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the U.S. Nuclear Regulatory Commission. To assist in identifying packaging, and index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory

  13. 76 FR 32321 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... approve revisions to the Pennsylvania State Implementation Plan (SIP). The revision consists of a change... prior SIP-approved I/M program to change the duration of the timing of quality assurance audits...

  14. The Impact of Personal and Program Characteristics on the Placement of School Leadership Preparation Program Graduates in School Leader Positions

    Science.gov (United States)

    Fuller, Edward J.; Hollingworth, Liz; An, Brian P.

    2016-01-01

    Purpose: The purpose of this study is to examine the impact of personal and program characteristics on the placement of graduates of principal preparation programs in assistant principal, principal, and school leadership positions. Research Design: This study relies on Texas principal production data from 1993 through 2007 matched to employment…

  15. Standards for Competence in Braille Literacy Skills in Teacher Preparation Programs.

    Science.gov (United States)

    Amato, Sheila

    2002-01-01

    A survey was conducted with 45 instructors from teacher training programs for teaching students with visual impairments. Respondents evidenced a strong commitment to Braille literacy and teacher preparation, however, findings indicate a lack of consistency in Braille courses with respect to standards and criteria for competence in Braille…

  16. Questioning the Use of Outcome Measures to Evaluate Principal Preparation Programs

    Science.gov (United States)

    Fuller, Ed; Hollingworth, Liz

    2018-01-01

    Policymakers are proposing the use of outcome measures as indicators of effective principal preparation programs. The three most common metrics recommended are: (1) graduates' effectiveness in improving student achievement test scores, (2) graduate job placement rates, and (3) principal job retention once employed. This article explores the use of…

  17. Creating Professional Learning Communities in a Traditional Educational Leadership Preparation Program

    Science.gov (United States)

    Doolittle, Gini; Stanwood, H. Mark; Simmerman, Herb

    2006-01-01

    In this article, the authors examine the prerequisites for leadership preparation programs with regard to implementing and institutionalizing professional learning communities as an instructional strategy. First, the authors posit that as faculty they must examine and reflect on their own teaching practices and how they influence their reciprocal…

  18. Learning in Context: Technology Integration in a Teacher Preparation Program Informed by Situated Learning Theory

    Science.gov (United States)

    Bell, Randy L.; Maeng, Jennifer L.; Binns, Ian C.

    2013-01-01

    This investigation explores the effectiveness of a teacher preparation program aligned with situated learning theory on preservice science teachers' use of technology during their student teaching experiences. Participants included 26 preservice science teachers enrolled in a 2-year Master of Teaching program. A specific program goal was to…

  19. Directory of Certificates of Compliance for Radioactive Materials Packages: Report of NRC approved packages

    International Nuclear Information System (INIS)

    1988-12-01

    This directory contains a Report of the US Nuclear Regulatory Commission's Approved Packages (Volume 1), all Certificates of Compliance (Volume 2), and a Report of NRC Approved Quality Assurance Programs (Volume 3) for Radioactive Material Packages effective October 1, 1988. The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volume 2 of the directory. A listing by packaging types is included in the back of Volume 2. An alphabetical listing by Company name is included in the back of Volume 3 for approved QA programs. The Reports include a listing of all users of each package design and approved QA programs prior to the publication date of the directory

  20. Directory of certificates of compliance for radioactive materials packages, Report of NRC approved packages

    International Nuclear Information System (INIS)

    1990-10-01

    This directory contains a Report of the US Nuclear Regulatory Commission's Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Report of NRC Approved Quality Assurance Programs (Volume 3) for Radioactive Materials Packages effective October 1, 1990. The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volume 2 of the directory. A listing by packaging types is included in the back of Volume 2. An alphabetical listing by Company name is included in the back of Volume 3 for approved QA programs. The Reports include a listing of all users of each package design and approved QA programs prior to the publication date of the directory

  1. The AP600 advanced simplified nuclear power plant. Results of the test program and progress made toward final design approval

    International Nuclear Information System (INIS)

    Bruschi, H.J.

    1996-01-01

    At the 1994 Pacific Basin Conference, Mr. Bruschi presented a paper describing the AP600, Westinghouse's advanced light water reactor design with passive safety features. Since then, a rigorous test program was completed and AP600 became the most thoroughly tested advanced reactor system design in history. Westinghouse is now well on its way toward receiving Final Design Approval from the U.S. Nuclear Regulatory Commission for AP600. In this paper, the results of the test program will be discussed and an update on prospects for building the plant will be covered. (author)

  2. The AP600 advanced simplified nuclear power plant. Results of the test program and progress made toward final design approval

    Energy Technology Data Exchange (ETDEWEB)

    Bruschi, H.J. [Westinghouse Electric Corp., Pittsburgh, PA (United States)

    1996-10-01

    At the 1994 Pacific Basin Conference, Mr. Bruschi presented a paper describing the AP600, Westinghouse`s advanced light water reactor design with passive safety features. Since then, a rigorous test program was completed and AP600 became the most thoroughly tested advanced reactor system design in history. Westinghouse is now well on its way toward receiving Final Design Approval from the U.S. Nuclear Regulatory Commission for AP600. In this paper, the results of the test program will be discussed and an update on prospects for building the plant will be covered. (author)

  3. Preparing Interprofessional Faculty to Be Humanistic Mentors for Medical Students: The GW-Gold Mentor Development Program.

    Science.gov (United States)

    Blatt, Benjamin; Plack, Margaret M; Simmens, Samuel J

    2018-01-01

    The GW-Gold Humanistic Mentor Development Program addresses the challenge faced by medical schools to educate faculty to prepare students for humanistic practice. Grounded in Branch's Teaching Professional and Humanistic Values model, the program prepares interprofessional faculty mentoring teams in humanistic communities of practice. The teams consist of physician-psychosocial professional pairs, each mentoring a small student group in their professional development course. Through GW-Gold workshops, faculty mentors develop interprofessional humanistic communities of practice, preparing them to lead second such communities with their students. This article describes the program and its evaluation. To assess outcomes and better understand the mentor experience, we used a mixed-method validating triangulation design consisting of simultaneous collection of quantitative (mentor and student surveys) and qualitative (open-ended survey questions and focus group) data. Data were analyzed in parallel and merged at the point of interpretation, allowing for triangulation and validation of outcomes. Mentors rated the program highly, gained confidence in their humanistic skills, and received high scores from students. Three themes emerged that validated program design, confirmed outcomes, and expanded on the mentor experience: (1) Interprofessional faculty communities developed through observation, collaboration, reflection, and dialogue; (2) Humanistic mentors created safe environments for student engagement; and (3) Engaging in interprofessional humanistic communities of practice expanded mentors' personal and professional identities. Outcomes support the value of the GW-Gold program's distinctive features in preparing faculty to sustain humanism in medical education: an interprofessional approach and small communities of practice built on humanistic values.

  4. Krsko NPP Periodic Safety Review program

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Novsak, M.

    2001-01-01

    The need for conducting a Periodic Safety Review for the Krsko NPP has been clearly recognized both by the NEK and the regulator (SNSA). The PSR would be highly desirable both in the light of current trends in safety oversight practices and because of many benefits it is capable to provide. On January 11, 2001 the SNSA issued a decision requesting the Krsko NPP to prepare a program and determine a schedule for the implementation of the program for 'Periodic Safety Review of NPP Krsko'. The program, which is required to be in accordance with the IAEA safety philosophy and with the EU practice, was submitted for the approval to the SNSA by the end of March 2001. The paper summarizes Krsko NPP Periodic Safety Review Program [1] including implemented SNSA and IAEA Expert Mission comments.(author)

  5. Preparing Secondary Stem Teachers for High-Need Schools: Challenges of an Urban Residency Program

    Science.gov (United States)

    Garza, Rubén; Duchaine, Ellen L.; Reynosa, Raymond

    2013-01-01

    Teaching residency programs that blend coursework with clinical experiences have emerged nationwide to prepare aspiring teachers for the demanding reality of teaching in high-need urban schools. The Teaching Residency Program for Critical Shortage Areas was created to help urban school districts with the challenge of recruiting and retaining…

  6. Permanent certification program for health information technology; revisions to ONC-Approved Accreditor processes. Final rule.

    Science.gov (United States)

    2011-11-25

    Under the authority granted to the National Coordinator for Health Information Technology by section 3001(c)(5) of the Public Health Service Act (PHSA) as added by the Health Information Technology for Economic and Clinical Health (HITECH) Act, this final rule establishes a process for addressing instances where the ONC-Approved Accreditor (ONC-AA) engages in improper conduct or does not perform its responsibilities under the permanent certification program. This rule also addresses the status of ONC-Authorized Certification Bodies (ONC-ACBs) in instances where there may be a change in the accreditation organization serving as the ONC-AA and clarifies the responsibilities of the new ONC-AA.

  7. A Quantitative Correlational Study of Teacher Preparation Program on Student Achievement

    Science.gov (United States)

    Dingman, Jacob Blackstone

    2010-01-01

    The purpose of this quantitative correlational study was to identify the relationship between the type of teacher preparation program and student performance on the seventh and eighth grade mathematics state assessments in rural school settings. The study included a survey of a convenience sample of 36 teachers from Colorado and Washington school…

  8. 75 FR 53269 - Federal Acquisition Regulation; Tribal Consultation; Justification and Approval of Sole-Source 8...

    Science.gov (United States)

    2010-08-31

    ... and approval of sole-source contracts over $20 million under the 8(a) small business development... valuable component of its deliberations in preparing to implement this law, which includes contracting with... Regulation; Tribal Consultation; Justification and Approval of Sole-Source 8(a) Contracts AGENCIES...

  9. 14 CFR 121.909 - Approval of Advanced Qualification Program.

    Science.gov (United States)

    2010-01-01

    ... criteria. Each AQP must have separate curriculums for indoctrination, qualification, and continuing... the training and evaluation of CRM and technical skills and knowledge. An application for approval of... must meet all the requirements of this subpart. (2) Each indoctrination, qualification, and continuing...

  10. Startup program after SGR and power increase

    International Nuclear Information System (INIS)

    Krajnc, B.; Dudas, M.; Spiler, J.; Novsak, M.

    2000-01-01

    NPP Krsko replaced steam generators during the outage 2000. Parallel with the steam generator replacement all required systems modifications to accommodate new steam generators into the existing plant (upper feed,..) and support plant power increase of 6.3%, have been implemented. During the years 1997 - 2000 all the required licensing, technical analyses and systems verifications to support such plant changes have been completed. One of the activities within this effort was also the preparation of a detailed Plant Startup Program, which was subject of licensing review and approval process. An integrated plant startup program was then developed based on the plant startup test program, performed regularly during plant startup after refueling and above-mentioned Plant Startup Program. These additional tests defined by the Startup Test Program have been required due to new steam generators, steam generator replacement and related modifications, and power increase from previous 1882 MWt to 2000 MWt. During the preparation period, a startup team was established and procedures were written. All procedures sensitive to the operation were validated on the plant specific simulator. This paper presents more about the Startup Test Program, analysis of its implementation, the results of some key tests as well as the lessons learned. (author)

  11. A Qualitative Assessment of the My True Body Bariatric Surgery Preparation Program

    Science.gov (United States)

    Nakamura, Tracy; Mamary, Edward

    2013-01-01

    Background: The My True Body (MTB) group intervention incorporates cognitive restructuring and social support into bariatric surgery preparation. Purpose: To identify and describe program components that support long-term behavioral modifications and influence confidence in healthy weight maintenance. Methods: Semistructured telephone interviews…

  12. 2011 Annual Criticality Safety Program Performance Summary

    Energy Technology Data Exchange (ETDEWEB)

    Andrea Hoffman

    2011-12-01

    TSR limits fuel plate bundles to 1085 grams U-235, which is the maximum loading of an ATR fuel element. The overloaded fuel plate bundle contained 1097 grams U-235 and was assembled under an 1100 gram U-235 limit in 1982. In 2003, the limit was reduced to 1085 grams citing a new criticality safety evaluation for ATR fuel elements. The fuel plate bundle inventories were not checked for compliance prior to implementing the reduced limit. A subsequent review of the NMIS inventory did not identify further violations. Requirements Management - The INL Criticality Safety program is organized and well documented. The source requirements for the INL Criticality Safety Program are from 10 CFR 830.204, DOE Order 420.1B, Chapter III, 'Nuclear Criticality Safety,' ANSI/ANS 8-series Industry Standards, and DOE Standards. These source requirements are documented in LRD-18001, 'INL Criticality Safety Program Requirements Manual.' The majority of the criticality safety source requirements are contained in DOE Order 420.1B because it invokes all of the ANSI/ANS 8-Series Standards. DOE Order 420.1B also invokes several DOE Standards, including DOE-STD-3007, 'Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities.' DOE Order 420.1B contains requirements for DOE 'Heads of Field Elements' to approve the criticality safety program and specific elements of the program, namely, the qualification of criticality staff and the method for preparing criticality safety evaluations. This was accomplished by the approval of SAR-400, 'INL Standardized Nuclear Safety Basis Manual,' Chapter 6, 'Prevention of Inadvertent Criticality.' Chapter 6 of SAR-400 contains sufficient detail and/or reference to the specific DOE and contractor documents that adequately describe the INL Criticality Safety Program per the elements specified in DOE Order 420.1B. The Safety Evaluation Report for SAR-400

  13. Preparing Science Teachers: Strong Emphasis on Science Content Course Work in a Master's Program in Education

    Science.gov (United States)

    Ajhar, Edward A.; Blackwell, E.; Quesada, D.

    2010-05-01

    In South Florida, science teacher preparation is often weak as a shortage of science teachers often prompts administrators to assign teachers to science classes just to cover the classroom needs. This results is poor preparation of students for college science course work, which, in turn, causes the next generation of science teachers to be even weaker than the first. This cycle must be broken in order to prepare better students in the sciences. At St. Thomas University in Miami Gardens, Florida, our School of Science has teamed with our Institute for Education to create a program to alleviate this problem: A Master of Science in Education with a Concentration in Earth/Space Science. The Master's program consists of 36 total credits. Half the curriculum consists of traditional educational foundation and instructional leadership courses while the other half is focused on Earth and Space Science content courses. The content area of 18 credits also provides a separate certificate program. Although traditional high school science education places a heavy emphasis on Earth Science, this program expands that emphasis to include the broader context of astronomy, astrophysics, astrobiology, planetary science, and the practice and philosophy of science. From this contextual basis the teacher is better prepared to educate and motivate middle and high school students in all areas of the physical sciences. Because hands-on experience is especially valuable to educators, our program uses materials and equipment including small optical telescopes (Galileoscopes), several 8-in and 14-in Celestron and Meade reflectors, and a Small Radio Telescope installed on site. (Partial funding provided by the US Department of Education through Minority Science and Engineering Improvement Program grant P120A050062.)

  14. Developing Democratic and Transformational School Leaders: Graduates' Perceptions of the Impact of Their Preparation Program

    Science.gov (United States)

    Stevenson, Robert B.; Doolittle, Gini

    2003-01-01

    As administrative preparation programs ground strategies for developing new genres of school leaders in transformational and democratic communities, of particular interest are the instructional and programmatic strategies that contribute to successful program outcomes. Constructed over time, this article highlights the specific contribution of…

  15. Accreditation of Professional Preparation Programs for School Health Educators: The Changing Landscape

    Science.gov (United States)

    Taub, Alyson; Goekler, Susan; Auld, M. Elaine; Birch, David A.; Muller, Susan; Wengert, Deitra; Allegrante, John P.

    2014-01-01

    The health education profession is committed to maintaining the highest standards of quality assurance, including accreditation of professional preparation programs in both school and community/public health education. Since 2001, the Society for Public Health Education (SOPHE) has increased attention to strengthening accreditation processes for…

  16. Directory of Certificates of Compliance for Radioactive Materials Packages: Report of NRC Approved Packages

    International Nuclear Information System (INIS)

    1993-10-01

    This directory contains a Report of NRC Approved Packages (Volume 1). The purpose of this directory is to make available a convenient source of information on Quality Assurance Programs and Packagings which have been approved by the US Nuclear Regulatory Commission. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR section 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure themselves that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program

  17. Development of the Office of Civilian Radioactive Waste Management's Self-Assessment Program

    International Nuclear Information System (INIS)

    Vlahakis, J.G.; Palabrica, R.J.; Goldsmith, S.

    1993-01-01

    This paper describes the development and implementation of the Self-Assessment (SA) Program of the Office of Civilian Radioactive Waste Management (RW). The basis for RW's SA Program is discussed, as well as RW's approach for meeting self-assessment requirements, RW's organization for self-assessment, actions to establish RW's SA Program, and planned RW SA implementation activities. This paper also discusses how self-assessment can support programmatic decisions and actions. The RW Director has approved and issued the Self-Assessment Management Plan that describes how RW will organize and manage its SA program. He has directed Associate/Office Directors to prepare individual Implementation Plans to provide specifics on how their Offices will meet the requirements of the RW SA Program. To assist in the preparation of these Implementation Plans, the RW Self-Assessment Unit (SAU), which manages the SA Program on behalf of the RW Director, has conducted a series of SA Implementation Workshops. The SAU has also developed an Annotated Outline for SA Implementation Plans. Following issuance of Office-specific Implementation Plans, independent evaluations by the SAU are planned

  18. Preparing Teachers for Technology Integration: Programs, Competencies, and Factors from the Literature

    Science.gov (United States)

    Oliver, Kevin; Townsend, Latricia

    2013-01-01

    This article presents a review of recent literature about preparing teachers for technology integration. The review found six types of training programs are commonly implemented: pre-service training, long-term courses, short-term workshops and institutes, coaching/mentoring, learning communities, and product/assessment approaches. The review…

  19. 24 CFR 990.300 - Preparation of operating budget.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Preparation of operating budget... Resident Management Corporations (RMCs) § 990.300 Preparation of operating budget. (a) The RMC and the PHA must submit operating budgets and calculations of operating subsidy to HUD for approval in accordance...

  20. Directory of Certificates of Compliance for Radioactive-Materials Packages. Summary report of NRC approved packages

    International Nuclear Information System (INIS)

    1983-01-01

    This directory contains a Summary Report of the US Nuclear Regulatory Commission's Approved Packages (Volume I), all Certificates of Compliance (Volume 2), and Summary Report of NRC Approved Quality Assurance Programs (Volume 3) for Radioactive Material Packages effective December 31, 1982. The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the back of Volumes 1 and 2 of the directory. A listing by packaging types is included in the back of Volume 2. An alphabetical listing by company name is included in the back of Volume 3 for approved QA programs. The Summary Reports include a listing of all users of each package design and approved QA programs prior to the publication date of the directory

  1. 7 CFR 1948.82 - Plan and State Investment Strategy approval procedure.

    Science.gov (United States)

    2010-01-01

    ... the State Investment Strategy for Energy Impacted Areas. (c) Appropriate growth management and/or... 7 Agriculture 13 2010-01-01 2009-01-01 true Plan and State Investment Strategy approval procedure... Impacted Area Development Assistance Program § 1948.82 Plan and State Investment Strategy approval...

  2. 13 CFR 108.380 - Final approval as a NMVC Company.

    Science.gov (United States)

    2010-01-01

    ... VENTURE CAPITAL (âNMVCâ) PROGRAM Evaluation and Selection of NMVC Companies § 108.380 Final approval as a... amount of Regulatory Capital set forth in its application, pursuant to § 108.310(a)(1); and (B) The... at least 30 percent of its Regulatory Capital if the Conditionally Approved NMVC Company— (i) Already...

  3. 9 CFR 317.4 - Labeling approval.

    Science.gov (United States)

    2010-01-01

    ... undue economic hardship; and (iv) An unfair competitive advantage would not result from the granting of... Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY... approval to the Food Labeling Division, Regulatory Programs, Food Safety and Inspection Service, and...

  4. University Strategic Planning: A Process for Change in a Principal Preparation Program

    Science.gov (United States)

    Guerra, Federico R.; Zamora, Roberto; Hernandez, Rosalinda; Menchaca, Velma

    2017-01-01

    This study describes a strategic planning process used for developing an educational leadership program that prepares principals for leading 21st century schools. The plan is based on recommendations received from the External reviewers representing Southern Association of Colleges and Schools, the Texas Education Agency, survey responses received…

  5. RH Packaging Program Guidance

    International Nuclear Information System (INIS)

    Washington TRU Solutions, LLC

    2003-01-01

    The purpose of this program guidance document is to provide technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the SARP and/or C of C shall govern. The C of C states: ''...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, ''Operating Procedures,'' of the application.'' It further states: ''...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, ''Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M and O) contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with 10 CFR (section) 71.11, ''Deliberate Misconduct.'' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions. Following these instructions assures that operations are safe and meet the requirements of the SARP. This document is available on the Internet at: ttp://www.ws/library/t2omi/t2omi.htm. Users are responsible for ensuring they are using the current revision and change notices. Sites may prepare their own document using the word

  6. Changes in teacher efficacy and beliefs during a one-year teacher preparation program

    Science.gov (United States)

    Lockman, Alison Schirmer

    This study attempted to further understanding of factors affecting the teacher efficacy beliefs of secondary science preservice teachers, and to develop a model relating teacher efficacy to beliefs about teaching and students. A mixed quantitative and qualitative methodology was utilized in order to track participants' beliefs both broadly and in depth throughout a one-year teacher preparation program. Results from this analysis revealed that preservice teachers at the end of the program had significantly higher personal science teaching efficacy beliefs than at the beginning of the program. No significant difference in science teaching outcome expectancy beliefs was found, although individual preservice teachers did develop alternate beliefs. Teacher efficacy beliefs were directly affected by three of Bandura's four sources of self-efficacy beliefs---Mastery experiences, vicarious experiences, and verbal persuasion---with the influence of each source of self-efficacy information appearing to change during the course of the teacher preparation program. No evidence was found that affective states by themselves had resulted in belief changes, although many of the other experiences were more powerful because they were accompanied by an emotional incident. Connections between teacher efficacy beliefs, beliefs about students, and beliefs about teaching were uncovered, as was the importance of content knowledge and pedagogical content knowledge on a teacher's sense of efficacy.

  7. Physical Training Program Guidelines for U.S. Navy Recruits: Preparing Recruits for Battle Stations

    National Research Council Canada - National Science Library

    Trone, D

    1999-01-01

    ...) a directive instructing RDCs to ensure that the physical conditioning program for women is sufficient to prepare them for successful completion of the final physical readiness test and Battle Stations...

  8. Improving Leadership Preparation Programs through a School, University, and Professional Organization Partnership.

    Science.gov (United States)

    Peel, Henry A.; Wallace, Corinna

    Beginning educational administrators often find that they are unprepared to deal with the realities of school administration. This paper describes how the Halifax County, North Carolina, school system worked with a national organization and an area university to develop a plan to improve its administrator-preparation program. In 1992 the school…

  9. Pre-Service Bilingual Teachers and Their Invisible Scars: Implications for Preparation Programs

    Science.gov (United States)

    Sarmiento-Arribalzaga, Matilde A.; Murillo, Luz A.

    2010-01-01

    In this paper, we describe how language "autobiographies" are used in a teacher preparation program (TEP) as a healing pedagogy to understand the impact longstanding traditions of symbolic violence in education have had on Latino students who are in the process of becoming teachers. Writing about themselves and their education experience…

  10. A guide for approval of x-ray fluorescence analysis devices

    International Nuclear Information System (INIS)

    1990-01-01

    This guide has been written to assist manufacturers, distributors and users of x-ray fluorescence analysis devices in the preparation of a submission to the Atomic Energy Control Board (AECB) in support of a request for approval of an x-ray fluorescence analysis device. Prior to the issuance of a Radioisotope licence authorizing the use or possession of an x-ray fluorescence analysis device in Canada, the design and construction of the device must be approved by the AECB. The AECB assessment is limited to the radiation safety aspects of use and packaging for transportation

  11. 44 CFR 78.10 - Project grant approval process.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.10 Project grant approval process. The State POC will solicit applications from...

  12. 75 FR 13337 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Science.gov (United States)

    2010-03-19

    ... improvements. Snow equipment purchase--liquid deice truck. Brief Description of Project Approved for Use: Main... bridges (gates 1 and 4). Update airport layout plan and master plan. Prepare storm water pollution...

  13. Technical Progress Report for UTSI/CFFF MDH Program Completion and Related Activity

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-04-01

    Routine preventive maintenance of the DOE Coal Fired Flow Facility (CFFF) is being performed. Modernization programs, funded under subcontract from Foster Wheeler Development Corporation by the DOE HIPPS Program, have been completed on the coal processing system, the data acquisition and control system and the control room. Environmental restoration actions continued with monitoring of groundwater wells and holding pond effluent. A plan for Groundwater Remediation was prepared, coordinated with DOE and approved by the State of Tennessee. Actions are underway to dispose of spent seed/ash mixtures and excess coal remaining from the MHD POC program. The status of five (5) High Temperature Superconductor (HTS) projects is reported.

  14. 6 CFR 27.240 - Review and approval of security vulnerability assessments.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Review and approval of security vulnerability assessments. 27.240 Section 27.240 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.240 Review and approval...

  15. 42 CFR 8.13 - Revocation of accreditation and accreditation body approval.

    Science.gov (United States)

    2010-10-01

    ... GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Certification and Treatment Standards § 8.13... period of 1 year after the date of withdrawal of approval of the accreditation body, unless SAMHSA.... (2) Within 1 year from the date of withdrawal of approval of an accreditation body, or within any...

  16. 78 FR 59360 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Public...

    Science.gov (United States)

    2013-09-26

    ... Greater Risk Program. Burden Statement: Burden in this context means the time expended by persons to... Office of Management and Budget (OMB) for review and approval. The ICR is for renewal of the approved...: Girls at Greater Risk for Juvenile Delinquency and HIV Prevention Program. OMB No.: 0990-0360. Abstract...

  17. The International Context of Teacher Preparation: Rejoinder to "Isn't It Time We Did Something about the Lack of Teaching Preparation in Business Doctoral Programs?"

    Science.gov (United States)

    Gibbs, Graham

    2016-01-01

    This paper, a rejoinder to "Isn't It Time We Did Something about the Lack of Teaching Preparation in Business Doctoral Programs?" by Marx et al., suggests glancing at practices outside the United States to get some perspective on the nature of the problem of why so little emphasis is placed on teaching preparation in business doctoral…

  18. Hanford Site Guide for Preparing and Maintaining Fenerator Group Pollution Prevention Program Documentation

    International Nuclear Information System (INIS)

    PLACE, B.G.

    1999-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention/Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 1998a) and Prime Contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and (300501) (RCRA and EPA, 1994). Documentation guidance for the following five P2/WMin elements are discussed: Fiscal Year (FY) Goals; Budget and Staffing; Waste Minimization (WMinn ) Assessments (WMAs); Pollution Prevention (P2) Reporting; WMin Certification

  19. A Program to Prepare Graduate Students for Careers in Climate Adaptation Science

    Science.gov (United States)

    Huntly, N.; Belmont, P.; Flint, C.; Gordillo, L.; Howe, P. D.; Lutz, J. A.; Null, S. E.; Reed, S.; Rosenberg, D. E.; Wang, S. Y.

    2017-12-01

    We describe our experiences creating a graduate program that addresses the need for a next generation of scientists who can produce, communicate, and help implement actionable science. The Climate Adaptation Science (CAS) graduate program, funded by the National Science Foundation Research Traineeship (NRT) program, prepares graduate students for careers at the interfaces of science with policy and management in the field of climate adaptation, which is a major 21st-century challenge for science and society. The program is interdisciplinary, with students and faculty from natural, social, and physical sciences, engineering, and mathematics, and is based around interdisciplinary team research in collaboration with partners from outside of academia who have climate adaptation science needs. The program embeds students in a cycle of creating and implementing actionable science through a two-part internship, with partners from government, non-governmental organizations, and industry, that brackets and informs a year of interdisciplinary team research. The program is communication-rich, with events that foster information exchange and understanding across disciplines and workplaces. We describe the CAS program, our experiences in developing it, the research and internship experiences of students in the program, and initial metrics and feedback on the effectiveness of the program.

  20. Requirements, guidance and logic in planning environmental investigations: Approval versus implementation

    International Nuclear Information System (INIS)

    Brice, D.A.; Meredith, D.V.; Harris, M.Q.

    1993-01-01

    In today's litigious society, it is important for both private parties and government to plan and conduct environmental investigations in a scientifically sound manner, documenting the purpose, methods, and results in a consistent fashion throughout the exercise. Planning documents are prepared during the initial phases of environmental investigations. Project objectives, including data quality requirements, specific work to be conducted to fulfill data needs, and operating procedures are specified. Regulatory agency approval of these documents is often required prior to plan implementation. These approvals are necessary and appropriate to fulfilling the agency's mandated role. Many guidance documents prepared by regulatory agencies suggest the content and format of various scoping documents. These guidances help standardize thought processes and considerations in planning, and provide a template to ensure that both the plan and the proposed work will fulfill regulatory requirements. This work describes the preparation and use of guidance documents for planning environmental studies. The goals and some of the pitfalls of such documents are discussed. Guidance should include the following elements: the purpose of the guidance and a description of where it applies; the type of items to be addressed in planning; identification of requirements are applicable to all projects for which the guidance is intended; identification of requirements only applicable in certain situations; a description of items to facilitate planning; a suggested format for fulfilling requirements; example applications of the guidance. Disagreements arise between planners and reviewers/approvers when elements of guidance are used as leverage to require work not directly related to project objectives. Guidance may be inappropriately used as a milestone by which site-specific plans are judged. Regulatory agency review and approval may be regarded as a primary objective of the plan

  1. How To Prepare Program Proposals for the American Psychological Association Annual Convention.

    Science.gov (United States)

    Tentoni, Stuart C.

    The purpose of this paper is to dispel myths about preparing program proposals for the American Psychological Association's annual convention. The report's goal is to increase the number of student presenters at future annual conventions. It has been determined that, for a variety of reasons, psychology graduate students participate more in poster…

  2. An Analysis of the Selection and Distribution of Knowledge in Massachusetts Music Teacher Preparation Programs: The Song Remains the Same

    Science.gov (United States)

    Borek, Matthew

    2012-01-01

    Music teachers occupy a conflicted and contested position in many secondary schools, and music teacher education programs have been given the task of preparing students to enter this challenging environment. This qualitative dissertation study examined the explicit, implicit, and null curricula of music teacher preparation programs in…

  3. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  4. Directory of certificates of compliance for radioactive materials packages. Volume 1, Revision 17: Report of NRC approved packages

    International Nuclear Information System (INIS)

    1994-10-01

    This directory contains a Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Report of NRC Approved Quality Assurance Programs for Radioactive Materials Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on Quality Assurance Programs and Packagings which have been approved by the US Nuclear Regulatory Commission. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR section 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure themselves that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program

  5. 6 CFR 27.245 - Review and approval of site security plans.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  6. Second Life®: A 3D Virtual Immersive Environment for Teacher Preparation Courses in a Distance Education Program

    Science.gov (United States)

    Hartley, Melissa D.; Ludlow, Barbara L.; Duff, Michael C.

    2015-01-01

    Many colleges and universities rely upon online programs to support distance delivery of personnel preparation programs in special education and related services. These distance education programs enable individuals who live or work in rural communities to access training programs to earn teaching certification and assist rural schools in…

  7. 34 CFR 614.1 - What is the purpose of the Preparing Tomorrow's Teachers to Use Technology program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What is the purpose of the Preparing Tomorrow's Teachers to Use Technology program? 614.1 Section 614.1 Education Regulations of the Offices of the... Use Technology program? (a) This program provides grants to help future teachers become proficient in...

  8. 7 CFR 1700.55 - Telecommunications Program.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Telecommunications Program. 1700.55 Section 1700.55... AGRICULTURE GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.55 Telecommunications Program. (a..., Telecommunications Program, has the authority to approve the following loans, loan guarantees, and lien...

  9. Hanford Site guide for preparing and maintaining generator group pollution prevention program documentation

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 1998a) and Prime contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Documentation guidance for the following five P2/WMin elements are discussed: Fiscal Year (FY) Goals; Budget and Staffing; Waste Minimization (WMin) Assessments (WMAs); Quarterly Pollution Prevention (P2) Reporting WMin Certification

  10. 40 CFR 131.21 - EPA review and approval of water quality standards.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) WATER PROGRAMS WATER QUALITY STANDARDS Procedures for Review and Revision of Water Quality Standards § 131.21 EPA review and approval of water quality standards. (a) After the State submits its... analysis. (b) The Regional Administrator's approval or disapproval of a State water quality standard shall...

  11. 77 FR 74225 - Proposed Extension of the Approval of Information Collection Requirements

    Science.gov (United States)

    2012-12-13

    ... proposal to extend Office of Management and Budget (OMB) approval of the Information Collection: Work-Study... reporting requirements that include a Work Study Program application and written participation agreement. In... private school system to file with the Wage and Hour Division Administrator an application for approval of...

  12. The influence of the systematic birth preparation program on childbirth satisfaction.

    Science.gov (United States)

    Akca, Aysu; Corbacioglu Esmer, Aytul; Ozyurek, Eser Sefik; Aydin, Arife; Korkmaz, Nazli; Gorgen, Husnu; Akbayir, Ozgur

    2017-05-01

    The primary purpose of this study was to assess the influence of a systematic multidisciplinary birth preparation program on satisfaction with childbirth experience. A secondary aim was to detect factors that affect the childbirth satisfaction. In this prospective study, 77 pregnant women who completed the 4-month birth preparation program (Group 1) and 75 women in the control group (Group 2) were asked to fill out two questionnaires with face-to-face interviews within 48 h after labor. One of the questionnaires was the translated form of Salmon's Item List German (SIL-Ger), and SIL-Ger scores ≥70 was accepted as a satisfactory experience. There was no statistically significant difference between the groups in terms of sociocultural and intrapartum characteristics, and obstetric outcome parameters. The women who received antenatal education experienced significantly less pain (p = 0.01), had a better communication with midwife or obstetrician during delivery (p = 0.001), and participated more actively in decision-making before, during, and after childbirth (p women had a SIL score ≥70 (96.1 vs 73.3%, p women to communicate better with healthcare providers and to participate in decision-making during labor, as well as by decreasing the perception of labor pain.

  13. VA Student Financial Aid. Opportunity To Reduce Overlap in Approving Education and Training Programs. Report to the Committee on Veterans' Affairs, U.S. Senate.

    Science.gov (United States)

    General Accounting Office, Washington, DC. Health, Education, and Human Services Div.

    The Department of Veterans Affairs (VA) contracts with state approving agencies (SAAs) to assess whether schools and training programs offer education of sufficient quality for veterans to receive VA education assistance benefits when attending them. The General Accounting Office examined the gatekeeping activities of the VA and the Department of…

  14. Avelumab: First Global Approval.

    Science.gov (United States)

    Kim, Esther S

    2017-05-01

    Avelumab (Bavencio ® ) is an intravenously administered programmed cell death ligand-1-blocking human antibody initially developed by EMD Serono Inc. (the biopharmaceutical division of Merck KGaA, Darmstadt, Germany) [now jointly developed and commercialized by EMD Serono Inc. and Pfizer] for the treatment of various tumours. It has received accelerated approval in the USA for the treatment of metastatic Merkel cell carcinoma (mMCC) in adults and paediatric patients aged ≥12 years. The marketing authorization application for avelumab in the treatment of mMCC is undergoing regulatory review in the EU, the biologics license application for avelumab in the treatment of urothelial carcinoma is undergoing priority review by the FDA, and avelumab is in various stages of development internationally for a variety of cancers. This article summarizes the milestones in the development of avelumab leading to this first approval for mMCC.

  15. Nye County, Nevada 1992 nuclear waste repository program: Program overview. Final report

    International Nuclear Information System (INIS)

    1998-01-01

    The purpose of this document is to provide an overview of the Nye County FY92 Nuclear Waste Repository Program (Program). Funds to pay for Program costs will come from the Federal Nuclear Waste Fund, which was established under the Nuclear Waste Policy Act of 1982 (NWPA). In early 1983, the Yucca Mountain was identified as a potentially suitable site for the nation's first geologic repository for spent reactor fuel and high-level radioactive waste. Later that year, the Nye County Board of County Commissioners (Board) established the capability to monitor the Federal effort to implement the NWPA and evaluate the potential impacts of repository-related activities on Nye County. Over the last eight years, the County's program has grown in complexity and cost in order to address DOE's evolving site characterization studies, and prepare for the potential for facility construction and operation. Changes were necessary as well, in response to Congress's redirection of the repository program specified in the amendments, to the NWPA approved in 1987. In early FY 1991, the County formally established a project office to plan and implement its program of work. The Repository Project Office's (RPO) mission and functions are provided in Section 2.0. The RPO organization structure is described in Section 3.0

  16. Science Teaching Experiences in Informal Settings: One Way to Enrich the Preparation Program for Preservice Science Teachers

    Science.gov (United States)

    Hsu, Pei-Ling

    2016-01-01

    The high attrition rate of new science teachers demonstrates the urgent need to incorporate effective practices in teacher preparation programs to better equip preservice science teachers. The purpose of the study is to demonstrate a way to enrich preservice science teachers' preparation by incorporating informal science teaching practice into…

  17. 7 CFR 1700.54 - Electric Program.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Electric Program. 1700.54 Section 1700.54 Agriculture... GENERAL INFORMATION Loan and Grant Approval Authorities § 1700.54 Electric Program. (a) Administrator: The... Administrator, Electric Program, has the authority to approve the following loans, loan guarantees, and lien...

  18. Preparing Future Geoscience Professionals: Needs, Strategies, Programs, and Online Resources

    Science.gov (United States)

    Macdonald, H.; Manduca, C. A.; Ormand, C. J.; Dunbar, R. W.; Beane, R. J.; Bruckner, M.; Bralower, T. J.; Feiss, P. G.; Tewksbury, B. J.; Wiese, K.

    2011-12-01

    Geoscience faculty, departments, and programs play an important role in preparing future geoscience professionals. One challenge is supporting the diversity of student goals for future employment and the needs of a wide range of potential employers. Students in geoscience degree programs pursue careers in traditional geoscience industries; in geoscience education and research (including K-12 teaching); and opportunities at the intersection of geoscience and other fields (e.g., policy, law, business). The Building Strong Geoscience Departments project has documented a range of approaches that departments use to support the development of geoscience majors as professionals (serc.carleton.edu/departments). On the Cutting Edge, a professional development program, supports graduate students and post-doctoral fellows interested in pursuing an academic career through workshops, webinars, and online resources (serc.carleton.edu/NAGTWorkshops/careerprep). Geoscience departments work at the intersection of student interests and employer needs. Commonly cited program goals that align with employer needs include mastery of geoscience content; field experience; skill in problem solving, quantitative reasoning, communication, and collaboration; and the ability to learn independently and take a project from start to finish. Departments and faculty can address workforce issues by 1) implementing of degree programs that develop the knowledge, skills, and attitudes that students need, while recognizing that students have a diversity of career goals; 2) introducing career options to majors and potential majors and encouraging exploration of options; 3) advising students on how to prepare for specific career paths; 4) helping students develop into professionals, and 5) supporting students in the job search. It is valuable to build connections with geoscience employers, work with alumni and foster connections between students and alumni with similar career interests, collaborate with

  19. Safety analysis report upgrade program at the Plutonium Facility, Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Pan, P.Y.

    1993-01-01

    Plutonium research and development activities have resided at the Los Alamos National Laboratory (LANL) since 1943. The function of the Plutonium Facility (PF-4) has been to perform basic special nuclear materials research and development and to support national defense and energy programs. The original Final Safety Analysis Report (FSAR) for PF-4 was approved by DOE in 1978. This FSAR analyzed design-basis and bounding accidents. In 1986, DOE/AL published DOE/AL Order 5481.1B, ''Safety Analysis and Review System'', as a requirement for preparation and review of safety analyses. To meet the new DOE requirements, the Facilities Management Group of the Nuclear Material Technology Division submitted a draft FSAR to DOE for approval in April 1991. This draft FSAR analyzed the new configurations and used a limited-scope probabilistic risk analysis for accident analysis. During the DOE review of the draft FSAR, DOE Order 5480.23 ''Nuclear Safety Analysis Reports'', was promulgated and was later officially released in April 1992. The new order significantly expands the scope, preparation, and maintenance efforts beyond those required in DOE/AL Order 5481.1B by requiring: description of institutional and human-factor safety programs; clear definitions of all facility-specific safety commitments; more comprehensive and detailed hazard assessment; use of new safety analysis methods; and annual updates of FSARs. This paper describes the safety analysis report (SAR) upgrade program at the Plutonium Facility in LANL. The SAR upgrade program is established to meet the requirements in DOE Order 5480.23. Described in this paper are the SAR background, authorization basis for operations, hazard classification, and technical program elements

  20. Preparing LGBTQ-Allies and Combating Homophobia in a U. S. Teacher Education Program

    Science.gov (United States)

    Clark, Caroline T.

    2010-01-01

    Interns in a US teacher education program were surveyed regarding their attitudes towards diversity, particularly issues of sexuality, their feelings of "cultural competence" around diversity, and the repertoires of practices and resources they feel prepared to draw on in their work with middle and high schools students (11-18 year…

  1. Teachers' Perceptions of the Effectiveness of the Art Education Preparation Program in Kuwait

    Science.gov (United States)

    AlHaddad, Ghadeer

    2014-01-01

    This study was designed to investigate how pre-service, beginners, and advanced art teachers in Kuwait viewed their teacher preparation program by describing and evaluating its effectiveness. To examine the issues of art teacher training and current teaching, this study used quantitative and qualitative research approaches. The study included a…

  2. 27 CFR 17.181 - Exportation of medicinal preparations and flavoring extracts.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Exportation of medicinal... USED IN MANUFACTURING NONBEVERAGE PRODUCTS Miscellaneous Provisions § 17.181 Exportation of medicinal preparations and flavoring extracts. Medicinal preparations and flavoring extracts, approved for drawback under...

  3. 10 CFR 725.15 - Requirements for approval of applications.

    Science.gov (United States)

    2010-01-01

    ... Secret Restricted Data in C-91, Nuclear Reactors for Rocket Propulsion, will be approved only if the... propulsion and is directly engaged in or proposes to engage in a substantial research and development program in such field of work; or (ii) Is engaged in or proposes to engage in a substantial study program in...

  4. Are Canadian General Internal Medicine training program graduates well prepared for their future careers?

    Directory of Open Access Journals (Sweden)

    Snell Linda

    2006-11-01

    Full Text Available Abstract Background At a time of increased need and demand for general internists in Canada, the attractiveness of generalist careers (including general internal medicine, GIM has been falling as evidenced by the low number of residents choosing this specialty. One hypothesis for the lack of interest in a generalist career is lack of comfort with the skills needed to practice after training, and the mismatch between the tertiary care, inpatient training environment and "real life". This project was designed to determine perceived effectiveness of training for 10 years of graduates of Canadian GIM programs to assist in the development of curriculum and objectives for general internists that will meet the needs of graduates and ultimately society. Methods Mailed survey designed to explore perceived importance of training for and preparation for various aspects of Canadian GIM practice. After extensive piloting of the survey, including a pilot survey of two universities to improve the questionnaire, all graduates of the 16 universities over the previous ten years were surveyed. Results Gaps (difference between importance and preparation were demonstrated in many of the CanMEDS 2000/2005® competencies. Medical problems of pregnancy, perioperative care, pain management, chronic care, ambulatory care and community GIM rotations were the medical expert areas with the largest gaps. Exposure to procedural skills was perceived to be lacking. Some procedural skills valued as important for current GIM trainees and performed frequently (example ambulatory ECG interpretation had low preparation ratings by trainees. Other areas of perceived discrepancy between training and practice included: manager role (set up of an office, health advocate (counseling for prevention, for example smoking cessation, and professional (end of life issues, ethics. Conclusion Graduates of Canadian GIM training programs over the last ten years have identified perceived gaps

  5. 7 CFR 1486.302 - Can changes be made to a project once it has been approved?

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Can changes be made to a project once it has been... MARKETS PROGRAM Program Operations § 1486.302 Can changes be made to a project once it has been approved? (a) Approved projects may be modified if circumstances change in such a way that they would likely...

  6. The Political Sense of Urgency for Educational Leadership Preparation Programs to Show Impact Data

    Science.gov (United States)

    Storey, Valerie; Asadoorian, Malcolm O., III

    2014-01-01

    Higher education today is confronted with increasing marketization and aggressive regulation of the public sector. In an attempt to address these challenging issues, public universities are undergoing unprecedented change, particularly Colleges of Education. Redesigning educational leadership preparation programs, working in partnership with local…

  7. Postsecondary Education Preparation/Career Exploration: Designing a Pilot Educational Counseling Program for Rural Counties

    Science.gov (United States)

    Gill, Rajinder S.

    2010-01-01

    American students accustomed to standardization in secondary education have experience with fulfilling the requirements imposed upon them, but often these students require further assistance to facilitate their personal decisions about education after high school. Postsecondary education and career preparation programs, educators, and educational…

  8. Development of Strategies for the Preservation of School Counselor Preparation Programs: A Monograph.

    Science.gov (United States)

    Cecil, Jean Houchins; Comas, Robert E.

    A project dealing with strategies to preserve school counselor preparation programs, evolving from the work of the Southern Association for Counselor Education and Supervision (SACES) Round Table of Department Heads, is described. Factors involved in what SACES believes may be the demise of school counseling, at least as it is known presently, are…

  9. Looked after or Left Behind: The Effectiveness of Principal Preparation Programs as Perceived by Generation Y Principals

    Science.gov (United States)

    Sledge, Chandra

    2013-01-01

    This research study intended to discover the perceptions of 10 Illinois Generation Y novice high school principals pertaining to the effectiveness of their principal preparation programs in terms of how well it prepared them to lead in the first three years of their principalship, and what subsequent professional development they deemed necessary…

  10. The Culture of Family: How a Model Early Childhood Teacher Preparation Program Navigates a Limited Context

    Science.gov (United States)

    Nitecki, Elena

    2012-01-01

    This article examines an extraordinarily successful early childhood education teacher preparation program at an urban 2-year college struggling with retention. The Early Childhood Education Program in this case study is able to maintain a graduation rate that is over four times greater than that of the college average and has a reputation for…

  11. Innovative methods for inorganic sample preparation

    Energy Technology Data Exchange (ETDEWEB)

    Essling, A.M.; Huff, E.A.; Graczyk, D.G.

    1992-04-01

    Procedures and guidelines are given for the dissolution of a variety of selected materials using fusion, microwave, and Parr bomb techniques. These materials include germanium glass, corium-concrete mixtures, and zeolites. Emphasis is placed on sample-preparation approaches that produce a single master solution suitable for complete multielement characterization of the sample. In addition, data are presented on the soil microwave digestion method approved by the Environmental Protection Agency (EPA). Advantages and disadvantages of each sample-preparation technique are summarized.

  12. Innovative methods for inorganic sample preparation

    International Nuclear Information System (INIS)

    Essling, A.M.; Huff, E.A.; Graczyk, D.G.

    1992-04-01

    Procedures and guidelines are given for the dissolution of a variety of selected materials using fusion, microwave, and Parr bomb techniques. These materials include germanium glass, corium-concrete mixtures, and zeolites. Emphasis is placed on sample-preparation approaches that produce a single master solution suitable for complete multielement characterization of the sample. In addition, data are presented on the soil microwave digestion method approved by the Environmental Protection Agency (EPA). Advantages and disadvantages of each sample-preparation technique are summarized

  13. The Perceived Benefits of a Preparing Future Faculty Program and Its Effect on Job Satisfaction, Confidence, and Competence

    Science.gov (United States)

    Wurgler, Emily; VanHeuvelen, Jane S.; Rohrman, Shawna; Loehr, Annalise; Grace, Matthew K.

    2014-01-01

    The training of effective instructors and future faculty members is a critical component of doctoral programs in sociology. Many universities and departments have instituted a single course, course sequence, or certification program dedicated to the preparation of future academic faculty. This article evaluates the efficacy of one such program,…

  14. [Evaluating programs for preparation to old age: some theoretical thoughts and a practical example (author's transl)].

    Science.gov (United States)

    Schneider, H D

    1977-07-01

    In the first part methodically satisfactory experimental designs for evaluating programs for preparation to old age on the basis of Cambell & Stanely (1963) are sketched including conditions which hinder the realization of the ideal notions. In the second part an experiment for comparing two preparatory courses to old age using different methods of instruction is described. It was observed that the more demanding teaching method resulted in more anxiety for old age. This led to the conclusion, that programs for preparation to old age should be planned as a sequence of several units in which the mastering of the new ideas may be learned and in which this learning process may be supervised.

  15. 78 FR 69664 - Proposed Information Collection Request; Comment Request; Approval of State Coastal Nonpoint...

    Science.gov (United States)

    2013-11-20

    ... Collection Request; Comment Request; Approval of State Coastal Nonpoint Pollution Control Programs AGENCY... to submit an information collection request (ICR), ``Approval of State Coastal Nonpoint Pollution... Watershed Protection Division, Office of Wetlands Oceans and Watersheds, Mail Code 4503-T, Environmental...

  16. Bacteriophage-based Probiotic Preparation for Managing Shigella Infections

    Science.gov (United States)

    2015-04-16

    The preparation (designated “ShigActive”) is a bacteriophage cocktail that specifically targets Shigella spp. (significant diarrhea-causing pathogens...phages lytic for Shigella , and we have developed a murine model in which the in vivo efficacy of our 1. REPORT DATE (DD-MM-YYYY) 4. TITLE AND...10-Apr-2013 Approved for Public Release; Distribution Unlimited Final Report: Bacteriophage-based Probiotic Preparation for Managing Shigella

  17. An Analysis of the Influence of Graph Theory When Preparing for Programming Contests

    Directory of Open Access Journals (Sweden)

    Cristina Jordán

    2017-01-01

    Full Text Available The subject known as Programming Contests in the Bachelor’s Degree in Computer Engineering course focuses on solving programming problems frequently met within contests such as the Southwest Europe Regional Contest (SWERC. In order to solve these problems one first needs to model the problem correctly, find the ideal solution, and then be able to program it without making any mistakes in a very short period of time. Leading multinationals such as Google, Apple, IBM, Facebook and Microsoft place a very high value on these abilities when selecting candidates for posts in their companies. In this communication we present some preliminary results of an analysis of the interaction between two optional subjects in the Computer Science Degree course: Programming Contests (PC and Graphs, Models and Applications (GMA. The results of this analysis enabled us to make changes to some of the contents in GMA in order to better prepare the students to deal with the challenges they have to face in programming contests.

  18. Drugs Cleared Through The FDA's Expedited Review Offer Greater Gains Than Drugs Approved By Conventional Process.

    Science.gov (United States)

    Chambers, James D; Thorat, Teja; Wilkinson, Colby L; Neumann, Peter J

    2017-08-01

    We investigated whether drugs approved by the Food and Drug Administration (FDA) through expedited review have offered larger health gains, compared to drugs approved through conventional review processes. We identified published estimates of additional health gains (measured in quality-adjusted life-years, or QALYs) associated with drugs approved in the period 1999-2012 through expedited (seventy-six drugs) versus conventional (fifty-nine) review processes. We found that drugs in at least one expedited review program offered greater gains than drugs reviewed through conventional processes (0.182 versus 0.003 QALYs). We also found that, compared to drugs not included in the same program, greater gains were provided by drugs in the priority review (0.175 versus 0.007 QALYs), accelerated approval (0.370 versus 0.031 QALYs), and fast track (0.254 versus 0.014 QALYs) programs. Our analysis suggests that the FDA has prioritized drugs that offer the largest health gains. Project HOPE—The People-to-People Health Foundation, Inc.

  19. An Examination of Mental Health Content in Course Work and Field Experiences in Connecticut Educational Leadership Preparation Programs

    Science.gov (United States)

    Papa, Dorothy P.

    2017-01-01

    This exploratory mixed method convergent parallel study examined Connecticut Educational leadership preparation programs for the existence of mental health content to learn the extent to which pre-service school leaders are prepared for addressing student mental health. Interviews were conducted with school mental health experts and Connecticut…

  20. Isn't It Time We Did Something about the Lack of Teaching Preparation in Business Doctoral Programs?

    Science.gov (United States)

    Marx, Robert D.; Garcia, Joseph E.; Butterfield, D. Anthony; Kappen, Jeffrey A.; Baldwin, Timothy T.

    2016-01-01

    In this essay, we explore "why" there has traditionally been so little emphasis on teaching preparation in business doctoral programs. Program administrators and faculty typically espouse support for teaching development; yet the existing reward systems are powerfully aligned in favor of a focus on research competency. Indeed, through…

  1. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  2. 75 FR 39619 - Proposed Information Collection (Quarterly Report of State Approving Agency) Activities Activity...

    Science.gov (United States)

    2010-07-09

    ... information needed to accurately reimburse State Approving Agencies (SAAs) for expenses incurred in the... reimburses SAAs for expenses incurred in the approval and supervision of education and training programs. SAAs are required to report their activities to VA quarterly and provide notices regarding which...

  3. The pipeline training program in maternal and child health: interdisciplinary preparation of undergraduate students from underrepresented groups.

    Science.gov (United States)

    Pizur-Barnekow, Kris; Rhyner, Paula M; Lund, Shelley

    2010-05-01

    The Preparing Academically Successful Students in Maternal and Child Health (MCH PASS) training program provided financial support and specialized training to occupational therapy (OT) and speech-language pathology (SLP) undergraduate students from underrepresented groups in maternal and child health. The project assisted undergraduate trainees to matriculate into graduate programs in their respective fields and facilitated application into long-term maternal and child health training programs. Sixteen trainees (8 OT and 8 SLP) participated in an undergraduate training program with an emphasis on interdisciplinary teaming, family mentoring, leadership development, public health and population-based research. Instruction occurred in community and classroom settings through didactic instruction and small group discussions. Fifteen of the trainees applied to and were accepted in graduate programs in their respective fields. Two trainees applied to a long-term MCH training program. Students reported increased knowledge about programs that serve women and children, the effects of poverty on health, interdisciplinary teaming and the daily routines of families who have a child with a special health care need. The MCH PASS program provided a unique opportunity for undergraduate students in OT and SLP to learn about public health with an emphasis on maternal and child health. The specialized preparation enabled students to understand better the health concerns of underserved families whose children have special health care needs.

  4. 40 CFR 123.30 - Judicial review of approval or denial of permits.

    Science.gov (United States)

    2010-07-01

    ... permitting process. A State will meet this standard if State law allows an opportunity for judicial review... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Judicial review of approval or denial... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS State Program Submissions § 123.30 Judicial review of...

  5. The Politics and Statistics of Value-Added Modeling for Accountability of Teacher Preparation Programs

    Science.gov (United States)

    Lincove, Jane Arnold; Osborne, Cynthia; Dillon, Amanda; Mills, Nicholas

    2014-01-01

    Despite questions about validity and reliability, the use of value-added estimation methods has moved beyond academic research into state accountability systems for teachers, schools, and teacher preparation programs (TPPs). Prior studies of value-added measurement for TPPs test the validity of researcher-designed models and find that measuring…

  6. 7 CFR 56.35 - Authority to use, and approval of official identification.

    Science.gov (United States)

    2010-01-01

    ... of labels or packaging materials bearing official identification or denial of the benefits of the Act.... No label, container, or packaging material bearing official identification may be printed or prepared... with this part. Packaging materials bearing official identification marks shall be approved pursuant to...

  7. Concerns of early career agricultural science teachers and the perceived effectiveness of educator preparation programs in addressing those concerns

    Science.gov (United States)

    Pearson, Camilla E.

    Little is known about the concerns and needs of early career agricultural teachers associated with the various routes to certification and how these routes address those concerns. The purpose of this study is to determine how selected early career agriculture teachers perceive their teacher preparation program and how effective their programs were at addressing these concerns during their first year of teaching. The sample consisted of secondary agricultural teachers in Texas FFA Areas V and VI, who self-identified themselves as an early career agricultural teacher in their first 3 years of teaching. The first phase included a web-based survey administered to assess the concerns of early career agricultural teachers. Two Likert-type scales were used, and these were used to assess the perceived importance of problems faced by early career agricultural teachers and the frequency in which they encounter those problems. The second phase included a qualitative interview to better understand the perceived relationship between participants' undergraduate preparation, experiences in agriculture and related organizations, and other related activities in preparing them as agriculture science teachers. The teachers interviewed in this study indicated that overall, they were pleased with their preparation. Teacher educators from both programs should address the concerns presented from all teachers to further prepare them for issues faced by early career teachers because it is evident that these issues are not going away.

  8. 77 FR 52233 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-08-29

    ...: EPA is approving revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution... Regulations for the Control of Atmospheric Pollution (PRRCAP). In the context of the Clean Air Act (CAA or Act... that approved the revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution...

  9. Innovative Noyce Program for Preparing High School Physics Teachers.

    Science.gov (United States)

    Hagedorn, Eric; Kosheleva, Olga; Wagler, Amy; Wagler, Ron

    2011-10-01

    The ``Robert Noyce Scholarships for Teaching Miners'' program at the University of Texas at El Paso currently consists of 14 mathematics majors minoring in secondary education, most of whom are preparing for the Mathematics-Physics Certification. From the time of their selection (junior year), till after they begin teaching, participants in this program will have financial support consisting of a 10,000 per year scholarship during the last two years in college. Programmatic support during these two years consists of four, half-day workshops emphasizing: 1) inquiry-based teaching, 2) mathematics & science integration, and 3) actual inquiry in the form of a senior research project. The workshops are facilitated by a team of university faculty and school district partners (EPISD and YISD). These district partners help with the workshops, but also mentor the scholars when placed at their classroom observation and student teacher sites. Once the scholars graduate and receive certification, they will experience unique induction year support: being hired in pairs or small groups and placed together in the same school. This placement with classmates combined with the mentoring of the same district personnel with whom they are familiar is hypothesized to be uniquely effective.

  10. 23 CFR 661.31 - Do IRRBP projects have to be listed on an approved IRR TIP?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Do IRRBP projects have to be listed on an approved IRR... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.31 Do IRRBP projects have to be listed on an approved IRR TIP? Yes. All IRRBP projects must be listed on an approved IRR TIP. The...

  11. 75 FR 36058 - Notice of Request for Extension and Revision of a Currently Approved Information Collection

    Science.gov (United States)

    2010-06-24

    ... Currently Approved Information Collection AGENCY: Agricultural Marketing Service, USDA. ACTION: Notice and...: Extension and revision of a currently approved information collection. Abstract: Marketing order programs... / Thursday, June 24, 2010 / Notices#0;#0; [[Page 36058

  12. Public speaking for the healthcare professional: Part I--Preparing for the program.

    Science.gov (United States)

    Baum, Neil

    2011-01-01

    It is true that most doctors do not enjoy public speaking. Most physicians, although good with one-on-one conversations with patients, are out of their comfort zone when it comes to speaking in front of other physicians, colleagues, and even lay persons. This three-part article will discuss the preparation, the presentation, and what you need to do after the program is over in order to become an effective public speaker.

  13. Preparations for the start-up of a research program in nuclear safeguards at Chalmers

    International Nuclear Information System (INIS)

    Avdic, Senada; Pazsit, Imre

    2004-03-01

    The Department of Reactor Physics at Chalmers University of Technology plans to start-up a research program in nuclear safeguards and nuclear material management. The program is aimed at utilizing the experimental facilities as well as the experience in reactor physics, criticality safety, signal processing and unfolding, and experimental nuclear techniques, in tackling problems in non-destructive assay (NDA) of nuclear materials. For the introductory part of this program, support has been received from the Swedish Nuclear Power Inspectorate to host Dr. Senada Avdic, University of Tuzla, Bosnia, as a post-doc for three months to participate in the preparatory program. The preparations were focussed on a survey of existing active non-destructive assay methods and preparations of their application in the experimental and theoretical/calculational research of our Department. The methods surveyed comprise - the use of a 252 Cf source in active NDA measurements; - planning of an experiment with the existing equipments of the Department; - time correlation measurements with a 252 Cf source and/or a 252 Cf detector; - Monte Carlo simulations of the time correlations between gammas and neutrons from a measurement with a 252 Cf detector: the MCNP-PoliMi code; - Identification of fissile material (enrichment/mass) with 252 Cf measurements; the use of various unfolding techniques (artificial neural networks) for identifying nuclear parameters; use of neutron activation analysis with a neutron generator for determination of distribution of material in an unknown sample; - determination of fissile material content by measurements of delayed neutrons

  14. Approved but non-funded vaccines: accessing individual protection.

    Science.gov (United States)

    Scheifele, David W; Ward, Brian J; Halperin, Scott A; McNeil, Shelly A; Crowcroft, Natasha S; Bjornson, Gordean

    2014-02-07

    Funded immunization programs are best able to achieve high participation rates, optimal protection of the target population, and indirect protection of others. However, in many countries public funding of approved vaccines can be substantially delayed, limited to a portion of the at-risk population or denied altogether. In these situations, unfunded vaccines are often inaccessible to individuals at risk, allowing potentially avoidable morbidity and mortality to continue to occur. We contend that private access to approved but unfunded vaccines should be reconsidered and encouraged, with recognition that individuals have a prerogative to take advantage of a vaccine of potential benefit to them whether it is publicly funded or not. Moreover, numbers of "approved but unfunded" vaccines are likely to grow because governments will not be able to fund all future vaccines of potential benefit to some citizens. New strategies are needed to better use unfunded vaccines even though the net benefits will fall short of those of funded programs. Canada, after recent delays funding several new vaccine programs, has developed means to encourage private vaccine use. Physicians are required to inform relevant patients about risks and benefits of all recommended vaccines, publicly funded or not. Likewise, some provincial public health departments now recommend and promote both funded and unfunded vaccines. Pharmacists are key players in making unfunded vaccines locally available. Professional organizations are contributing to public and provider education about unfunded vaccines (e.g. herpes zoster, not funded in any province). Vaccine companies are gaining expertise with direct-to-consumer advertising. However, major challenges remain, such as making unfunded vaccines more available to low-income families and overcoming public expectations that all vaccines will be provided cost-free, when many other recommended personal preventive measures are user-pay. The greatest need is to

  15. Programmed Death-Ligand 1 Immunohistochemistry Testing

    DEFF Research Database (Denmark)

    Büttner, Reinhard; Gosney, John R; Skov, Birgit Guldhammer

    2017-01-01

    Purpose Three programmed death-1/programmed death-ligand 1 (PD-L1) inhibitors are currently approved for treatment of non-small-cell lung cancer (NSCLC). Treatment with pembrolizumab in NSCLC requires PD-L1 immunohistochemistry (IHC) testing. Nivolumab and atezolizumab are approved without PD-L1...

  16. Alternative Renewable Biomass Tracking Program Document under the Renewable Fuel Standard Program

    Science.gov (United States)

    The approval letters that EPA approves a company's biomass tracking program meeting all the requirements outlined in 40 CFR part 80.1454, including elements determined necessary to achieve the level of quality assurance required under the regulation list.

  17. Directory of certificates of compliance for radioactive materials packages; Summary Report of NRC Approved Packages

    International Nuclear Information System (INIS)

    1980-12-01

    This directory contains a Summary Report of NRC approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Summary Report of NRC Approved Quality Assurance Programs for Radioactive Material Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the U.S. Nuclear Regulatory Commission. To assist in identifying packaging, and index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory. Shipments of radioactive material using these packagings must be in accordance with the provisions of 49 CFR 173.393a and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure them--that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program

  18. Section 609 Technician Training and Certification Programs

    Science.gov (United States)

    EPA-approved programs for technicians who service motor vehicle air conditioning (MVAC) systems. Any person who repairs or services a MVAC system for consideration must be certified under section 609 of the Clean Air Act by an EPA-approved program.

  19. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2005-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP charges the Waste Isolation Pilot Plant (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.

  20. 75 FR 2535 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Science.gov (United States)

    2010-01-15

    ...; Comment Request; Approval of State Coastal Nonpoint Pollution Control Programs (Renewal) AGENCY..., Assessment and Watershed Protection Division, Office of Wetlands Oceans and Watersheds, Mail Code 4503-T... docket, go to http://www.regulations.gov . Title: Approval of State Coastal Nonpoint Pollution Control...

  1. Preparing for Fellowship in Internal Medicine. Steps for Success with a Focus on Pulmonary and/or Critical Care Programs.

    Science.gov (United States)

    Bosslet, Gabriel T; Burkart, Kristin M; Miles, Matthew C; Lenz, Peter H; Huebert, Candace A; McCallister, Jennifer W

    2015-04-01

    This paper outlines specific tips for those applying to pulmonary and/or critical care medicine fellowship training in the United States using the PAIR-Match steps: preparation, application, interview, ranking, and match. Preparation for fellowship begins long before the application process with an assessment of one's long-term goals (to the extent that these are known). The cornerstone of the application is the curriculum vitae, which should highlight applicants' pulmonary and critical care-related experiences and scholarly work. Applicants should obtain letters of recommendation from faculty members who know them well and can write a letter that speaks to their strengths in clinical, scholarly, or leadership areas. The personal statement is an opportunity to share experiences not otherwise shared in the application and is an opportunity to explain any breaks in training or performance lapses. When selecting programs to which they will apply, applicants should pay close attention to the areas of education and curriculum, clinical experience, scholarly opportunity, and personal factors. Preparing for interviews should include a review of the program at which one is interviewing and development of relevant questions regarding details of the program. The interview day is the applicant's opportunity to see the "personality" of the program by meeting with the program director, faculty, and current fellows and to assess whether the program is a good fit for their goals. Applicants should only rank those programs they are willing to attend, in order of preference; they should be aware that the match process is binding.

  2. Directory of Certificates of Compliance for radioactive materials packages: Report of NRC approved packages. Volume 1, Revision 18

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volumes 1 and 2. An alphabetical listing by user name is included in the back of Volume 3 of approved QA programs. The reports include a listing of all users of each package design and approved QA programs prior to the publication date.

  3. Directory of Certificates of Compliance for radioactive materials packages: Report of NRC approved packages. Volume 1, Revision 18

    International Nuclear Information System (INIS)

    1995-10-01

    The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volumes 1 and 2. An alphabetical listing by user name is included in the back of Volume 3 of approved QA programs. The reports include a listing of all users of each package design and approved QA programs prior to the publication date

  4. 75 FR 52710 - Notice of Request for Extension of Approval of an Information Collection; National Management...

    Science.gov (United States)

    2010-08-27

    ...] Notice of Request for Extension of Approval of an Information Collection; National Management Information... approval of an information collection associated with cooperative wildlife damage management programs...: For information on the national management information system for cooperative wildlife damage...

  5. First approval procedure of the TL dosimetric service of the NPP in Slovenia

    International Nuclear Information System (INIS)

    Janzekovic, H.; Krizman, M.; Pucelj, B.; Stuhec, M.; Zdesar, U.

    2001-01-01

    The individual dosimetry of exposed workers in a NPP is one of the essential parts which demonstrates the radiation protection standards achieved in a facility. According to the current legislation the Ministry of Health of the Republic of Slovenia has the authority to grant approvals to personal dosimetric services which perform the dosimetric monitoring of workers in Slovenia. Due to the fact that the detailed approval procedure is not given in national regulations, the Ministry of Health in 2000 established a group of experts with the task to prepare technical and organising requirements for such approval. Based on international documents [1,2,3] the Approval procedure for the thermoluminescence dosimetric (TL) services was created. Following this procedure the assessment of the TL dosimetric service in the NPP was performed. The problems related to the technical and organising requirements with the emphasise on the QA/QC criteria of the TL dosimetric service will be discussed.(author)

  6. 42 CFR 403.318 - Approval of State systems.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Approval of State systems. 403.318 Section 403.318 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of State Reimbursement Control Systems § 403.318...

  7. 77 FR 71774 - Notice of Request for Extension of Approval of an Information Collection; National Management...

    Science.gov (United States)

    2012-12-04

    ...] Notice of Request for Extension of Approval of an Information Collection; National Management Information... approval of an information collection associated with cooperative wildlife damage management programs... FURTHER INFORMATION CONTACT: For information on the national management information system for cooperative...

  8. Preparations for the start-up of a research program in nuclear safeguards at Chalmers

    Energy Technology Data Exchange (ETDEWEB)

    Avdic, Senada; Pazsit, Imre

    2004-03-01

    The Department of Reactor Physics at Chalmers University of Technology plans to start-up a research program in nuclear safeguards and nuclear material management. The program is aimed at utilizing the experimental facilities as well as the experience in reactor physics, criticality safety, signal processing and unfolding, and experimental nuclear techniques, in tackling problems in non-destructive assay (NDA) of nuclear materials. For the introductory part of this program, support has been received from the Swedish Nuclear Power Inspectorate to host Dr. Senada Avdic, University of Tuzla, Bosnia, as a post-doc for three months to participate in the preparatory program. The preparations were focussed on a survey of existing active non-destructive assay methods and preparations of their application in the experimental and theoretical/calculational research of our Department. The methods surveyed comprise - the use of a {sup 252}Cf source in active NDA measurements; - planning of an experiment with the existing equipments of the Department; - time correlation measurements with a {sup 252}Cf source and/or a {sup 252}Cf detector; - Monte Carlo simulations of the time correlations between gammas and neutrons from a measurement with a {sup 252}Cf detector: the MCNP-PoliMi code; - Identification of fissile material (enrichment/mass) with {sup 252}Cf measurements; the use of various unfolding techniques (artificial neural networks) for identifying nuclear parameters; use of neutron activation analysis with a neutron generator for determination of distribution of material in an unknown sample; - determination of fissile material content by measurements of delayed neutrons.

  9. Irradiation Embrittlement Monitoring Programs of RPV's in the Slovak Republic NPP's

    International Nuclear Information System (INIS)

    Kupca, Ludovik

    2006-01-01

    Four types of surveillance programs were (are) realized in Slovak NPP's: 'Standard Surveillance Specimen Program' (SSSP) was finished in Jaslovske Bohunice V-2 Nuclear Power Plant (NPP) Units 3 and 4, 'Extended Surveillance Specimen Program' (ESSP), was prepared for Jaslovske Bohunice NPP V-2 with aim to validate the SSSP results, For the Mochovce NPP Unit 1 and 2 was prepared completely new surveillance program 'Modern Surveillance Specimen Program' (MSSP), based on the philosophy that the results of MSSP must be available during all NPP service life, For the Bohunice V-1 NPP was finished 'New Surveillance Specimen Program' (NSSP) coordinated by IAEA, which gave arguments for prolongation of service life these units for minimum 20 years, New Advanced Surveillance Specimen Program (ASSP) for Bohunice V-2 NPP (units 3 and 4) and Mochovce NPP (units 1, 2) is approved now. ASSP is dealing with the irradiation embrittlement of heat affected zone (HAZ) and RPV's austenitic cladding, which were not evaluated till this time in surveillance programs. SSSP started in 1979 and was finished in 1990. ESSP program started in 1995 and will be finished in 2007, was prepared with aim of: increasing of neutron fluence measurement accuracy, substantial improvement the irradiation temperature measurement, fixed orientation of samples to the centre of the reactor core, minimum differences of neutron dose for all the Charpy-V notch and COD specimens, the dose rate effect evaluation. In the year 1996 was started the new surveillance specimen program for the Mochovce RPV's unit-1 and 2, based on the fundamental postulate - to provide the irradiation embrittlement monitoring till the end of units operation. The 'New Surveillance Specimen Program' (NSSP) prepared in the year 1999 for the Bohunice V-1 NPP was finished in the year 2004. Main goal of this program was to evaluate the weld material properties degradation due to the irradiation and recovery efficiency by annealing too. The

  10. 7 CFR 1735.94 - Final approval and closing procedure.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE GENERAL POLICIES, TYPES OF LOANS, LOAN REQUIREMENTS-TELECOMMUNICATIONS PROGRAM Requirements for All Acquisitions and Mergers § 1735.94 Final approval and closing procedure. (a) Legal documents relating to the acquisition or merger, including copies of required franchises, commission orders...

  11. New technology planning and approval: critical factors for success.

    Science.gov (United States)

    Haselkorn, Ateret; Rosenstein, Alan H; Rao, Anil K; Van Zuiden, Michele; Coye, Molly J

    2007-01-01

    The steady evolution of technology, with the associated increased costs, is a major factor affecting health care delivery. In the face of limited capital resources, it is important for hospitals to integrate technology management with the strategic plan, mission, and resource availability of the organization. Experiences in technology management have shown that having a well-organized, consistent approach to technology planning, assessment, committee membership, approval, evaluation, implementation, and monitoring are key factors necessary to ensure a successful program. We examined the results of a survey that assessed the structure, processes, and cultural support behind hospital committees for new technology planning and approval.

  12. Regulatory acceptance of the proposed well abandonment program for the present landfill, Operable Unit 7, Rocky Flats Environmental Technology Site, Golden, Colorado

    International Nuclear Information System (INIS)

    Wood, M.R.

    1995-01-01

    The regulatory agencies approved a well abandonment program for the Present Landfill, Operable Unit (OU) 7 at the Rocky Flats Environmental Technology Site, only three months after preparation. The proposed well abandonment program consists of abandoning 26 of the 54 existing monitoring wells in OU 7 that are currently sampled quarterly as Resource Conservation and Recovery Act (RCRA) compliance wells or sitewide groundwater protection wells. Well abandonment was proposed on the basis that the purpose of each well has been fulfilled, the wells fall under the footprint of the landfill cap, the presence of the wells would compromise the integrity of the cap because holes would have to be cut in the synthetic liner, and unequal compaction of the fill material around the wells would potentially cause differential settlement of the cap. The proposal provided the technical justification to abandon the wells in place. The timely approval of the proposal by the regulatory agencies will allow the abandonment of the wells during fiscal year 1995 under the sitewide Well Abandonment and Replacement Program (WARP). Cost savings resulting from a decrease in the number of wells to be sampled under the groundwater monitoring program are estimated at $416,000 per year. This paper presents a summary of the well abandonment program, discusses the timely approvals required for implementation, and present the potential cost savings that can be achieved through implementation of the program

  13. Merging Regular and Special Education Teacher Preparation Programs: The Integrated Special Education-English Project (ISEP).

    Science.gov (United States)

    Miller, Darcy E.

    1991-01-01

    Describes the Integrated Special Education-English Project (ISEP) which facilitated the gradual integration of special education and English teacher preparation programs. A description of the ISEP model and a case study are included. The case study indicated student teachers who participated in the ISEP improved special education and English…

  14. Value-Added Models for Teacher Preparation Programs: Validity and Reliability Threats, and a Manageable Alternative

    Science.gov (United States)

    Brady, Michael P.; Heiser, Lawrence A.; McCormick, Jazarae K.; Forgan, James

    2016-01-01

    High-stakes standardized student assessments are increasingly used in value-added evaluation models to connect teacher performance to P-12 student learning. These assessments are also being used to evaluate teacher preparation programs, despite validity and reliability threats. A more rational model linking student performance to candidates who…

  15. Preparation in the business and practice of medicine: perspectives from recent gynecologic oncology graduates and program directors.

    Science.gov (United States)

    Schlumbrecht, Matthew; Siemon, John; Morales, Guillermo; Huang, Marilyn; Slomovitz, Brian

    2017-01-01

    Preparation in the business of medicine is reported to be poor across a number of specialties. No data exist about such preparation in gynecologic oncology training programs. Our objectives were to evaluate current time dedicated to these initiatives, report recent graduate perceptions about personal preparedness, and assess areas where improvements in training can occur. Two separate surveys were created and distributed, one to 183 Society of Gynecologic Oncology candidate members and the other to 48 gynecologic oncology fellowship program directors. Candidate member surveys included questions about perceived preparedness for independent research, teaching, job-hunting, insurance, and billing. Program director surveys assessed current and desired time dedicated to the topics asked concurrently on the candidate survey. Statistical analysis was performed using Chi-squared (or Fisher's exact test if appropriate) and logistic regression. Survey response rates of candidate members and program directors were 28% and 40%, respectively. Candidate members wanted increased training in all measures except retrospective protocol writing. Female candidates wanted more training on writing letters of intent (LOI) ( p  = 0.01) and billing ( p  communication between the two may serve to achieve the educational goals of each.

  16. Preparation and validation of gross alpha/beta samples used in EML's quality assessment program

    International Nuclear Information System (INIS)

    Scarpitta, S.C.

    1997-10-01

    A set of water and filter samples have been incorporated into the existing Environmental Measurements Laboratory's (EML) Quality Assessment Program (QAP) for gross alpha/beta determinations by participating DOE laboratories. The participating laboratories are evaluated by comparing their results with the EML value. The preferred EML method for measuring water and filter samples, described in this report, uses gas flow proportional counters with 2 in. detectors. Procedures for sample preparation, quality control and instrument calibration are presented. Liquid scintillation (LS) counting is an alternative technique that is suitable for quantifying both the alpha ( 241 Am, 230 Th and 238 Pu) and beta ( 90 Sr/ 90 Y) activity concentrations in the solutions used to prepare the QAP water and air filter samples. Three LS counting techniques (Cerenkov, dual dpm and full spectrum analysis) are compared. These techniques may be used to validate the activity concentrations of each component in the alpha/beta solution before the QAP samples are actually prepared

  17. Characterization of spent fuel approved testing material: ATM-106

    International Nuclear Information System (INIS)

    Guenther, R.J.; Blahnik, D.E.; Campbell, T.K.; Jenquin, U.P.; Mendel, J.E.; Thornhill, C.K.

    1988-10-01

    The characterization data obtained to date are described for Approved Testing Material (ATM)-106 spent fuel from Assembly BT03 of pressurized-water reactor Calvert Cliffs No. 1. This report is one in a series being prepared by the Materials Characterization Center at Pacific Northwest Laboratory on spent fuel ATMs. The ATMs are receiving extensive examinations to provide a source of well- characterized spent fuel for testing in the US Department of Energy Office of Civilian Radioactive Waste Management (OCWRM) program. ATM-106 consists of 20 full-length irradiated fuel rods with rod-average burnups of about 3700 GJ/kgM (43 MWd/kgM) and expected fission gas release of /approximately/10%. Characterization data include (1) as-fabricated fuel design, irradiation history, and subsequent storage and handling; (2) isotopic gamma scans; (3) fission gas analyses; (4) ceramography of the fuel and metallography of the cladding; (5) calculated nuclide inventories and radioactivities in the fuel and cladding; and (6) radiochemical analyses of the fuel and cladding. Additional analyses of the fuel rod are being conducted and will be included in planned revisions of this report. 12 refs., 110 figs., 81 tabs

  18. 77 FR 8219 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Coastal Zone Management... ICMP constitutes an approvable program and that requirements of the Coastal Zone Management Act (CZMA..., submitted a coastal management program to NOAA for approval under the Coastal Zone Management Act (CZMA), 16...

  19. 76 FR 49433 - Notice To Request an Extension and Revision of Currently Approved Information Collection and...

    Science.gov (United States)

    2011-08-10

    ... information will help NRCS to match the skills of individuals who are applying for volunteer work that will... Previously Approved Information Collection'' for volunteer workers (73 FR 62949). In accordance with the... request an extension for currently approved information collection, Volunteer Program-Earth Team. This...

  20. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  1. TFTR DT preparation project status

    Energy Technology Data Exchange (ETDEWEB)

    Perry, E.D.; Dudek, L.E.

    1993-11-01

    The Tokamak Fusion Test Reactor (TFTR) research program is preparing to commence the first high power Deuterium-Tritium (DT) experiments of the US Fusion Program. Hardware upgrades to TFTR required for DT operations have been completed. This paper discusses these hardware preparations.

  2. Template for letter of approval by Research Supervisor

    International Development Research Centre (IDRC) Digital Library (Canada)

    Liliane Castets-Poupart

    a) the approval of the candidate's final version of their research proposal (not just the research topic) by the research supervisor; b) the list of courses already completed and still to be completed by the candidate in the master's/PhD program; c) confirmation that all courses will be completed, and, for PhD candidates,.

  3. Approval Procedure for Technical Specifications for Procurement by Quotation and Tender

    International Nuclear Information System (INIS)

    Shaharum Ramli; Izhar Abu Hussin; Ying, K.K.

    2015-01-01

    Technical specifications for procurement requires the approval of the Jawatankuasa Penyemak Spesifikasi Teknikal Tender/ Sebutharga Agensi Nuklear Malaysia. This paper provides guidance for those who have to prepare a technical specification. In addition, the technical specification online library is introduced to facilitate them to re-use old technical specifications for new procurements or to make those the bases for drafting new specifications. (author)

  4. 78 FR 45 - Approval and Promulgation of Implementation Plans; Georgia: New Source Review-Prevention of...

    Science.gov (United States)

    2013-01-02

    ... fermentation processes; CO 2 from combustion of the biological fraction of municipal solid waste or biosolids... approve portions of a revision to the Georgia State Implementation Plan (SIP) submitted by the State of... are not required by the Act as part of an approvable SIP program. EPA believes that most states are...

  5. Report on the Survey on Regulation of Site Selection and Preparation

    International Nuclear Information System (INIS)

    Webster, Philip

    2010-01-01

    At its first meeting in May 2008, the Working Group discussed a task to 'Prepare a report reviewing the various practices used by regulators in the regulation of nuclear power plant siting. The report should consider regulator practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, decommissioning, etc) including organization of the regulators organisation, methods, systems, etc.'. Following discussion, the Working Group assigned an Action 1-5 to 'develop a survey on the regulation of nuclear sites including seismicity issues, security issues, multi-units aspects and regulator practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, decommissioning, etc.)'. The Survey was prepared and issued by the NEA in July 2008 with a request to the member states to provide their responses by the next meeting of the Working Group in October 2008. In addition to addressing the specific topics actioned by the Working Group, the Survey also investigated the broader context of siting, in order to address the Mandate that had been approved by the CNRA. The questions in the survey therefore covered the topics of site evaluation, site selection, regulatory approval, site preparation and regulatory oversight. A topic of particular interest was to what extent IAEA guidance on site evaluation was followed. The survey considered the possibility that a body other than the safety regulator may approve the choice of site or permit the applicant to start to prepare it. The survey also investigated the existence of formal requirements and informal expectations, recognizing that these both form part of the regulatory tool-kit. Responses were received from all twelve member states that were then members of the Working Group. The responses were reviewed at the second meeting of the Working Group in October 2008. In general, it could be stated that new reactors are licensed in

  6. "Context-Specific" Teacher Preparation for New York City: An Exploration of the Content of Context in Bard College's Urban Teacher Residency Program

    Science.gov (United States)

    Hammerness, Karen; Craig, Elizabeth

    2016-01-01

    In this article, we examine a residency program that was developed to prepare teachers specifically for New York City schools--the Bard College Master of Arts in Teaching Urban Teacher Residency program. This focused preparation on the particular urban context of New York City provides us with a unique opportunity to examine the nature of…

  7. 38 CFR 17.65 - Approvals and provisional approvals of community residential care facilities.

    Science.gov (United States)

    2010-07-01

    ... approvals of community residential care facilities. 17.65 Section 17.65 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Community Residential Care § 17.65 Approvals and provisional approvals of community residential care facilities. (a) An approval of a facility meeting all of...

  8. Yes!: Rejoinder to "Isn't It Time We Did Something about the Lack of Teaching Preparation in Business Doctoral Programs?"

    Science.gov (United States)

    Rousseau, Denise M.

    2016-01-01

    In this rejoinder to, "Isn't It Time We Did Something about the Lack of Teaching Preparation in Business Doctoral Programs?" (Marx, Garcia, Butterfield, Kappen, and Baldwin 2015), the author responds in agreement to the question raised regarding the lack of teaching preparation in business schools. This commentary offers suggestions to…

  9. 29 CFR 5.16 - Training plans approved or recognized by the Department of Labor prior to August 20, 1975.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Training plans approved or recognized by the Department of... STANDARDS ACT) Davis-Bacon and Related Acts Provisions and Procedures § 5.16 Training plans approved or... contractor shall be required to obtain approval of a training program which, prior to August 20, 1975, was...

  10. 40 CFR 52.385 - EPA-approved Connecticut regulations.

    Science.gov (United States)

    2010-07-01

    ... a specific situation, consult the plan identified in § 52.370. To the extent that this table.../4/06 8/31/06 71 FR 51761 (c)(95) Only the automotive refinishing requirements of 22a-174-3b are...) Program. 11/1/82 6/28/83 48 FR 29689 (c) 28 Simkins Industries—approved under the State Energy Trade...

  11. Creating a Masters in Numeracy Program

    Directory of Open Access Journals (Sweden)

    Eric Gaze

    2010-07-01

    Full Text Available The Master of Science in Numeracy program at Alfred University received full approval from the New York State Education Department (NYSED in May of 2007. This first-of-its-kind program seeks to provide teachers at all levels, from across the curriculum, the skills, and more importantly the confidence, to introduce relevant quantitative concepts in their own disciplines. Created to be a complement of the MS Ed. in Literacy, the 30-hour MS in Numeracy program consists of four required core courses (Teaching Numeracy, Teaching with Data, Assessment and Learning Theories in Numeracy, and Doing Science and Numeracy, five electives from a list of numeracy and literacy courses, and a Masters project. The program graduated its first student in May 2008 and three more since then. Major challenges for the program have included the uncertain (i.e., by-application connection between an MS and licensure (in contrast to the automatic professional certification for MS Ed. degrees and the small number of faculty involved in teaching the numeracy courses. The current status of the program is questionable as the person (the author who taught the first three core courses has left the University and has not yet been replaced. Even so, I believe this MS in Numeracy program offers a potentially useful example of a strategy to enhance the spread of QL through teacher preparation.

  12. In Preparation of the Nationwide Dissemination of the School-Based Obesity Prevention Program DOiT: Stepwise Development Applying the Intervention Mapping Protocol

    NARCIS (Netherlands)

    van Nassau, F.; Singh, A.S.; van Mechelen, W.; Brug, J.; Chin A Paw, M.J.M.

    2014-01-01

    BACKGROUND: The school-based Dutch Obesity Intervention in Teenagers (DOiT) program is an evidence-based obesity prevention program. In preparation for dissemination throughout the Netherlands, this study aimed to adapt the initial program and to develop an implementation strategy and materials.

  13. Preparing students to be doctors: introduction of a sub-internship program.

    LENUS (Irish Health Repository)

    Robb, W B

    2011-04-05

    Preparing graduates for the transformation from medical student to doctor provides medical schools with a real challenge. Medical educators advocate a process of graduated delegation of responsibility in the clinical years of medical school. This is best exemplified in the North American system of sub-internship programmes; an educational approach which European medical schools have been slow to adopt. This study reports on the introduction of an intensive two-week surgical sub-internship for final medical year students. "Sub-interns" were asked to complete pre and post sub-internship online questionnaires assessing their readiness to perform clinical and practical skills, attitudes towards the program, and how well it prepared students for internship. Forty-nine students completed a questionnaire pre sub-internship and 47 completed the post-questionnaire. Student confidence towards practical and clinical skills and their first day at work increased over the two weeks. Mean Iikert scores for all 6 practical and clinical skills improved post sub-internship. The introduction of a surgical sub-internship is timely and welcomed by medical students. Its development helps bridge the gap in responsibilities between medical student and doctor.

  14. 78 FR 49274 - Agency Information Collection Activities: Submission to OMB for Review and Approval; Public...

    Science.gov (United States)

    2013-08-13

    ... Collection Request Title: Black Lung Clinics Program Performance Measures OMB No. 0915-0292--Extension...) conducts an annual data collection of user information for the Black Lung Clinic Program, which has been ongoing with OMB approval since 2004. The purpose of the Black Lung Clinic Program is to improve the...

  15. 76 FR 32333 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania for the purpose of changing the...). Specifically, the Commonwealth is amending a provision of its prior SIP-approved I/M program to amend the...

  16. 75 FR 53220 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2010-08-31

    ...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved municipal solid waste landfill (MSWLF) program. The approved modification allows the State to..., and demonstration (RD&D) permits to be issued to certain municipal solid waste landfills by approved...

  17. 30 CFR 948.15 - Approval of West Virginia regulatory program amendments.

    Science.gov (United States)

    2010-07-01

    ..., 2008 CSR 38-2-2.39 (deletion of cumulative impact definition).CSR 38-2-3.22.e (approval of material... Legislative Rules at title 38, Series 2. June 29, 1990 October 4, 1991 CSR 38-2 §§ 2, 3, 5, 6, 9, 11 through 14, 17, 20, 22. July 12, 1991 November 19, 1991 CSR 38-2-20.5, .6, .7. July 30, 1993 August 16, 1995...

  18. 7 CFR 2201.23 - Funding for the Program.

    Science.gov (United States)

    2010-01-01

    ... the Program and operate the Program accordingly. (b) Credit Risk Premium—(1) Establishment and approval. The Board may establish and approve the acceptance of credit risk premiums with respect to a..., credit risk premiums shall be accepted from a non-Federal source on behalf of a Borrower. (2) Credit risk...

  19. 40 CFR 57.405 - Formulation, approval, and implementation of requirements.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Supplementary Control System...) Each NSO application shall include a complete description of any supplementary control system in... operational manual). (b) SCS content of the order. (1) Each NSO shall include an approved version of the plan...

  20. 21 CFR 660.25 - Potency tests without reference preparations.

    Science.gov (United States)

    2010-04-01

    ... recommended for slide tests or microplate techniques. Blood Grouping Reagent recommended for slide test... Grouping Reagent § 660.25 Potency tests without reference preparations. Products for which Reference Blood Grouping Reagents are not available shall be tested for potency by a method approved by the Director...

  1. A Training Program to Enhance Postgraduate Students' Research Skills in Preparing a Research Proposal in the Field of Curriculum and Instruction Methods of Arabic Language

    Science.gov (United States)

    Alfakih, Ahmed Hassan

    2017-01-01

    The study examined the impact of a training program on enhancing postgraduate students' research skills in preparing a research proposal. The nature of the skills required to prepare a research proposal were first determined using a questionnaire. A training program for improving such skills was then constructed and seven postgraduate students in…

  2. 19 CFR 115.41 - Certificate of approval for containers approved after manufacture.

    Science.gov (United States)

    2010-04-01

    ... after manufacture. 115.41 Section 115.41 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT... PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers After Manufacture § 115.41 Certificate of approval for containers approved after manufacture. The Certifying Authority shall...

  3. Medicare covers the majority of FDA-approved devices and Part B drugs, but restrictions and discrepancies remain.

    Science.gov (United States)

    Chambers, James D; May, Katherine E; Neumann, Peter J

    2013-06-01

    The Food and Drug Administration (FDA) and Medicare use different standards to determine, first, whether a new drug or medical device can be marketed to the public and, second, if the federal health insurance program will pay for use of the drug or device. This discrepancy creates hurdles and uncertainty for drug and device manufacturers. We analyzed discrepancies between FDA approval and Medicare national coverage determinations for sixty-nine devices and Part B drugs approved during 1999-2011. We found that Medicare covered FDA-approved drugs or devices 80 percent of the time. However, Medicare often added conditions beyond FDA approval, particularly for devices and most often restricting coverage to patients with the most severe disease. In some instances, Medicare was less restrictive than the FDA. Our findings highlight the importance for drug and device makers of anticipating Medicare's needs when conducting clinical studies to support their products. Our findings also provide important insights for the FDA's and Medicare's pilot parallel review program.

  4. 42 CFR 8.26 - Preparation of the review file and written arguments.

    Science.gov (United States)

    2010-10-01

    ... GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for Review of Suspension or Proposed Revocation of OTP Certification, and of Adverse Action Regarding Withdrawal of Approval of an... adverse action regarding withdrawal of approval of the accreditation body is incorrect (appellant's brief...

  5. Approved requirements for the packaging, labelling and carriage of radioactive material by rail

    International Nuclear Information System (INIS)

    1996-01-01

    This document specifies the detailed provisions in the United Kingdom with respect to rail transport for packages and packaging, test procedures for radioactive materials, information concerning the preparation of radioactive materials and the operation of tanks and container wagons. The Approved Requirements came into force on 1 September 1996 and are legally binding. (UK)

  6. Preparing Teens for Success: Building 21st Century Skills through a 4-H Work-Based Learning Program

    OpenAIRE

    Theresa M. Ferrari; Nate Arnett; Graham Cochran

    2008-01-01

    There is widespread concern that youth lack the skills essential for job success and are entering the workplace unprepared. To address issues of workforce preparation, Extension educators at an urban 4-H education center created the Job Experience and Training (JET) program, a work-based learning program for teens. JET is conducted over a six-month period, culminating in an eight-week summer work experience in collaboration with a local park district. Supervisors and teens completed a perform...

  7. A Program for the Preparation and Certification of School Administrators. Program E--Learning Resource Specialist. In Compliance with Guidelines and Standards for the Development and Approval of Programs of Preparation Leading to Certification [of] School Professional Personnel.

    Science.gov (United States)

    Canzler, Lillian

    The initial and continuing competencies needed by a district-level administrator in educational media or learning resources are outlined. An introductory discussion covers internship program procedures, supervision and evaluation, record keeping and reports, and competencies and skills. Competencies are then defined, the use of the format is…

  8. 77 FR 30327 - Approval of Information Collection Requirements; Comment Request

    Science.gov (United States)

    2012-05-22

    ... affirmative action programs based on functional or business units. A copy of this information collection... the request for Office of Management and Budget approval of the information collection request. FOR... regardless of race, sex, color, national origin, religion, or status as a qualified individual with a...

  9. Conditional approval: Japan lowers the bar for regenerative medicine products.

    Science.gov (United States)

    Sipp, Douglas

    2015-04-02

    A new system for conditional approval of regenerative medicine products will allow products of undetermined efficacy to enter the Japanese market. The potential scientific, economic, and ethical implications of this program highlight the need for further discussion and refinement. Copyright © 2015 Elsevier Inc. All rights reserved.

  10. 13 CFR 120.1716 - Required SBA approval of servicing actions.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Required SBA approval of servicing actions. 120.1716 Section 120.1716 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Establishment of SBA Secondary Market Guarantee Program for First Lien Position 504 Loan Pools...

  11. Lights, Camera, Action: Advancing Learning, Research, and Program Evaluation through Video Production in Educational Leadership Preparation

    Science.gov (United States)

    Friend, Jennifer; Militello, Matthew

    2015-01-01

    This article analyzes specific uses of digital video production in the field of educational leadership preparation, advancing a three-part framework that includes the use of video in (a) teaching and learning, (b) research methods, and (c) program evaluation and service to the profession. The first category within the framework examines videos…

  12. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    , cost, and schedule. The NIF Director controls the NNDP Interim Management Plan. A Draft Program Execution Plan (PEP) for the National NIF Diagnostics Program has been also been prepared (NIF-0072083, Oct 2001, attached as Attachment 1) that describes the NNDP technical, cost, and schedule baselines, the method by which the NNDP will fund and monitor the work to be done by the participating laboratories; the process for controlling changes; and the associated reporting and review process. This plan is expected to be approved by the relevant stakeholders at the appropriate time; however, since October 2001, the NNDP has been operating according to the processes laid out in the draft PEP. Below is a summary of the most important aspects of the NNDP that are being applied during this interim period before approval of the full PEP

  13. In Preparation of the Nationwide Dissemination of the School-Based Obesity Prevention Program DOiT: Stepwise Development Applying the Intervention Mapping Protocol

    Science.gov (United States)

    van Nassau, Femke; Singh, Amika S.; van Mechelen, Willem; Brug, Johannes; Chin A. Paw, Mai J. M.

    2014-01-01

    Background: The school-based Dutch Obesity Intervention in Teenagers (DOiT) program is an evidence-based obesity prevention program. In preparation for dissemination throughout the Netherlands, this study aimed to adapt the initial program and to develop an implementation strategy and materials. Methods: We revisited the Intervention Mapping (IM)…

  14. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2003-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP charges the WIPP management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs

  15. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT Shipping Package, and directly related components. This document complies with the minimum requirements as specified in TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event there is a conflict between this document and the SARP or C of C, the SARP and/or C of C shall govern. C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SAR P charges the WIPP Management and Operation (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize these operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs

  16. Using Innovative Resources and Programs to Prepare Pre- and In-Service Teachers for New Science Standards

    Science.gov (United States)

    Kinzler, R. J.; Short, J.; Contino, J.; Cooke-Nieves, N.; Howes, E.; Kravitz, D.; Randle, D.; Trowbridge, C.

    2014-12-01

    Leveraging the Rose Center for Earth and Space and active research departments in Earth and Planetary Science, Astrophysics, and Paleontology, the Education Department at the American Museum of Natural History (AMNH) offers an MAT program to prepare new Earth Science teachers (~100 new teachers by 2018) as well as a range of professional development (PD) opportunities for over 3,000 K-12 teachers annually, providing opportunities to learn with scientists; inquiry-based experiences; and standards-aligned resources. The AMNH produces innovative geoscience and other STEM resources supporting teacher and student science investigations with data visualizations and analysis tools, teaching case materials and other resources that provide rich nonfiction reading and writing opportunities for use in Earth and space science curricula that are integrated in the MAT and PD programs. Museum resources and the MAT and PD programs are aligned to support the recently released Next Generation Science Standards (NGSS) and the Common Core State Standards. The NGSS is a set of science and engineering practices, crosscutting concepts and disciplinary core ideas to help cultivate teachers' and K-12 students' scientific habits of mind, develop their knowledge and abilities to engage in scientific investigations, and teach them how to reason in context; goals that closely align with those of the AMNH's teacher preparation and professional development programs. A Framework for K-12 Science Education: Practices, Crosscutting Concepts, and Core Ideas (NRC, 2012) is a required text for the MAT program, and this text as well as the NGSS Performance Expectations guide the PD programs as well. Researchers working with Museum scientists and educators find it is not enough for programs for pre- and in-service teachers to provide access to resources. Research suggests that these programs need to engage pre- and in-service teachers in using and reflecting on these types of resources, as well as take

  17. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  18. Directory of certificates of compliance for radioactive materials packages. Volume 1. Summary report of NRC approved packages. Revision 6

    International Nuclear Information System (INIS)

    1983-09-01

    This directory contains a Summary Report of the US Nuclear Regulatory Commission's Approved Packages (Volume 1), all Certificates of Compliance (Volume 2), and Summary Report of NRC Approved Quality Assurance Programs (Volume 3) for Radioactive Material Packages effective September 14, 1983

  19. Characterization of spent fuel approved testing material---ATM-105

    Energy Technology Data Exchange (ETDEWEB)

    Guenther, R.J.; Blahnik, D.E.; Campbell, T.K.; Jenquin, U.P.; Mendel, J.E.; Thomas, L.E.; Thornhill, C.K.

    1991-12-01

    The characterization data obtained to data are described for Approved Testing Material 105 (ATM-105), which is spent fuel from Bundles CZ346 and CZ348 of the Cooper Nuclear Power Plant, a boiling-water reactor. This report is one in a series being prepared by the Materials Characterization Center at Pacific Northwest Laboratory (PNL) on spent fuel ATMs. The ATMs are receiving extensive examinations to provide a source of well-characterized spent fuel for testing in the US Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) Program. ATM-105 consists of 88 full-length irradiated fuel rods with rod-average burnups of about 2400 GJ/kgM (28 MWd/kgM) and expected fission gas release of about 1%. Characterization data include (1) descriptions of as-fabricated fuel design, irradiation history, and subsequent storage and handling; (2) isotopic gamma scans; (3) fission gas analyses; (4) ceramography of the fuel and metallography of the cladding; (5) special fuel studies involving analytical transmission electron microscopy (AEM); (6) calculated nuclide inventories and radioactivities in the fuel and cladding; and (7) radiochemical analyses of the fuel and cladding. Additional analyses of the fuel are being conducted and will be included in planned revisions of this report.

  20. RH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2008-01-01

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the 'RH-TRU 72-B cask') and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' It further states: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M and O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8, 'Deliberate Misconduct.' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, 'Packaging and Transportation of Radioactive Material,' certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, 'Reporting of Defects and Noncompliance,' regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous

  1. RH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2006-01-01

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' It further states: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M and O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 Code of Federal Regulations (CFR) 1.8, 'Deliberate Misconduct.' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, 'Packaging and Transportation of Radioactive Material,' certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, 'Reporting of Defects and Noncompliance,' regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these

  2. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  3. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  4. 75 FR 18061 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution...

    Science.gov (United States)

    2010-04-09

    ...The EPA is approving revisions to the Texas State Implementation Plan (SIP). We are approving revisions to Title 30 of the Texas Administrative Code (TAC), Chapter 114, which the State submitted on May 15, 2006, October 10, 2006, January 17, 2008, and February 28, 2008. These revisions establish the Rebate Grant Process and the Texas Clean School Bus Program, amend the Texas Emissions Reduction Plan (TERP), and amend the Locally Enforced Motor Vehicle Idling Limitations. The EPA is approving these revisions pursuant to section 110 of the Clean Air Act (CAA).

  5. Preparing new Earth Science teachers via a collaborative program between Research Scientists and Educators

    Science.gov (United States)

    Grcevich, Jana; Pagnotta, Ashley; Mac Low, Mordecai-Mark; Shara, Michael; Flores, Kennet; Nadeau, Patricia A.; Sessa, Jocelyn; Ustunisik, Gokce; Zirakparvar, Nasser; Ebel, Denton; Harlow, George; Webster, James D.; Kinzler, Rosamond; MacDonald, Maritza B.; Contino, Julie; Cooke-Nieves, Natasha; Howes, Elaine; Zachowski, Marion

    2015-01-01

    The Master of Arts in Teaching (MAT) Program at the American Museum of Natural History is a innovative program designed to prepare participants to be world-class Earth Science teachers. New York State is experiencing a lack of qualified Earth Science teachers, leading in the short term to a reduction in students who successfully complete the Earth Science Regents examination, and in the long term potential reductions in the number of students who go on to pursue college degrees in Earth Science related disciplines. The MAT program addresses this problem via a collaboration between practicing research scientists and education faculty. The faculty consists of curators and postdoctoral researchers from the Departments of Astrophysics, Earth and Planetary Sciences, and the Division of Paleontology, as well as doctoral-level education experts. During the 15-month, full-time program, students participate in a residency program at local urban classrooms as well as taking courses and completing field work in astrophysics, geology, earth science, and paleontology. The program targets high-needs schools with diverse populations. We seek to encourage, stimulate interest, and inform the students impacted by our program, most of whom are from traditionally underrepresented backgrounds, about the rich possibilities for careers in Earth Science related disciplines and the intrinsic value of the subject. We report on the experience of the first and second cohorts, all of whom are now employed in full time teaching positions, and the majority in high needs schools in New York State.

  6. 42 CFR 403.306 - Additional requirements for State systems-mandatory approval.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Additional requirements for State systems-mandatory approval. 403.306 Section 403.306 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of State...

  7. The Double Bind for Women: Exploring the Gendered Nature of Turnaround Leadership in a Principal Preparation Program

    Science.gov (United States)

    Weiner, Jennie Miles; Burton, Laura J.

    2016-01-01

    In this study of nine participants in a turnaround principal preparation program, Jennie Miles Weiner and Laura J. Burton explore how gender role identity shaped participants' views of effective principal leadership and their place within it. The authors find that although female and male participants initially framed effective leadership…

  8. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    International Nuclear Information System (INIS)

    1993-01-01

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation's energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization's ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization's commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans

  9. Preparing for Graduate-Level Training in Professional Psychology: Comparisons across Clinical PhD, Counseling PhD, and Clinical PsyD Programs

    Science.gov (United States)

    Karazsia, Bryan T.; Smith, Lena

    2016-01-01

    In the present study, faculty who teach in clinical and counseling doctor of philosophy (PhD) or doctor of psychology (PsyD) programs completed surveys regarding preferences for prospective student preparations to graduate programs. Faculty expectations of minimum and ideal undergraduate training were highest for scientific methods, though…

  10. Bibliography of marine radiation ecology prepared for the Seabed Program

    International Nuclear Information System (INIS)

    Schultz, V.S.

    1980-02-01

    References on the effects of ionizing radiation on aquatic organisms have been obtained from a number of sources. Many were obtained from reviews and other publications. Although the primary purpose of preparing this bibliography was to obtain information related to the nuclear wastes Seabed Disposal Biology Program of Sandia Laboratories, freshwater organisms are included as a matter of convenience and also with the belief that such a bibliography would be of interest to a wider audience than that restricted to the Seabed Program. While compilation of a list in an area broad in scope is often somewhat arbitrary, an attempt was made to reference publications that were related to field or laboratory studies of wild species of plants and animals with respect to radiation effects. Complete information concerning each reference are provided without excessive library search. Since one often finds references listed in the literature that are incompletely cited, it was not always possible to locate the reference for verification or completion of the citation. Such references are included where they appeared to be of possible value. When known, a reference is followed with its Nuclear Science Abstract designation, or rarely other abstract sources. Those desiring additional information should check Nuclear Science Abstracts utilizing the abstract number presented or other abstracting sources. In addition, the language of the article, other than English, is given when it is known to me

  11. Bibliography of marine radiation ecology prepared for the Seabed Program

    Energy Technology Data Exchange (ETDEWEB)

    Schultz, V.S.

    1980-02-01

    References on the effects of ionizing radiation on aquatic organisms have been obtained from a number of sources. Many were obtained from reviews and other publications. Although the primary purpose of preparing this bibliography was to obtain information related to the nuclear wastes Seabed Disposal Biology Program of Sandia Laboratories, freshwater organisms are included as a matter of convenience and also with the belief that such a bibliography would be of interest to a wider audience than that restricted to the Seabed Program. While compilation of a list in an area broad in scope is often somewhat arbitrary, an attempt was made to reference publications that were related to field or laboratory studies of wild species of plants and animals with respect to radiation effects. Complete information concerning each reference are provided without excessive library search. Since one often finds references listed in the literature that are incompletely cited, it was not always possible to locate the reference for verification or completion of the citation. Such references are included where they appeared to be of possible value. When known, a reference is followed with its Nuclear Science Abstract designation, or rarely other abstract sources. Those desiring additional information should check Nuclear Science Abstracts utilizing the abstract number presented or other abstracting sources. In addition, the language of the article, other than English, is given when it is known to me.

  12. K Basins Spent Nuclear Fuel (SNF) Project Safety Analysis Report for Packaging (SARP) approval plan

    International Nuclear Information System (INIS)

    1995-01-01

    This document delineates the plan for preparation, review, and approval of the K Basins Spent Nuclear Fuel (SNF) Packaging Design Criteria (PDC) document and the on-site Safety Analysis Report for Packaging (SARP). The packaging addressed in these documents is used to transport SNF in a Multi- canister Overpack (MCO) configuration

  13. Redfield Energy Approval

    Science.gov (United States)

    This September 19, 2016 letter from EPA approves the petition from Poet Biorefining-Lake Crystal, regarding non-This October 27, 2016 letter from EPA approves the petition from Redfield Energy, LLC, regarding non-grandfathered ethanol produced

  14. Innovating by developing new uses of already-approved drugs: trends in the marketing approval of supplemental indications.

    Science.gov (United States)

    DiMasi, Joseph A

    2013-06-01

    Much of the literature on trends and factors affecting biopharmaceutical innovation has focused overwhelmingly on the development and approval of never-before approved drugs and biologics. Little attention has been paid to new uses for already-approved compounds, which can be an important form of innovation. This paper aimed to determine and analyze recent trends in the number and type of new or modified US indication approvals for drugs and biologics. We also examine regulatory approval-phase times for new-use efficacy supplements and compare them to approval-phase times for original-use approvals over the same period. We developed a data set of efficacy supplements approved by the US Food and Drug Administration (FDA) from 1998 to 2011 that includes information on the type, approval-phase time (time from submission to the FDA of an application for marketing approval to approval of the application), and FDA therapeutic-significance rating for the approved application, which we obtained from an FDA Web site. This data set was merged with a Tufts Center for the Study of Drug Development (CSDD) data set of US new drug and biologics approvals. We developed descriptive statistics on trends in the number and type of new-use efficacy supplements, on US regulatory approval-phase times for the supplements, and on original new drug and biologics approvals over the study period and for the time from original- to new-use approval. The total number of new-use efficacy-supplement approvals did not exhibit a marked trend, but the number of new pediatric-indication approvals increased substantially. Approval-phase times for new-use supplements varied by therapeutic class and FDA therapeutic-significance rating. Mean approval-phase times were highest for central nervous system compounds (13.8 months) and lowest for antineoplastics (8.9 months). The mean time from original to supplement approval was substantially longer for new pediatric indications than for other new uses. Mean

  15. 77 FR 12905 - Meeting: RTCA Program Management Committee

    Science.gov (United States)

    2012-03-02

    ... Flight Guidance and Control Systems for Part 23 Airplanes, RTCA Paper No.018-12/PMC-956, prepared by SC..., Introductions, and Administrative Remarks Review/Approve Meeting Summary December 13, 2011, RTCA Paper No. 015...) Application, RTCA Paper No. 027-12/PMC-959, prepared by SC-186 Final Draft, New Document--Minimum Operational...

  16. Radiological Medical Device Innovation: Approvals via the Premarket Approval Pathway From 2000 to 2015.

    Science.gov (United States)

    Ghobadi, Comeron W; Hayman, Emily L; Finkle, Joshua H; Walter, Jessica R; Xu, Shuai

    2017-01-01

    The aim of this study was to critically assess the clinical evidence leading to radiologic medical device approvals via the premarket approval pathway from 2000 to 2015. This study used the publically available FDA premarket database for radiologic device approvals over the past 15 years (September 1, 2000, to August 31, 2015). Approval characteristics were collected for each device, and statistical analysis was performed on the data for each pivotal trial. Additionally, methodological quality of the pivotal trial was determined using the Quality Assessment of Diagnostic Accuracy Studies tool. Twenty-three class III radiologic device approvals were identified, with breast imaging accounting for 16 (70%) and computer-aided detection software accounting for 9 (39%) approvals. The median premarket approval time was 475 days (range, 180-1,116). Twenty-one devices were approved on the basis of multireader, multicenter studies, one on the basis of a randomized controlled trial, and one on the basis of a preclinical technical equivalence trial. The median number of patients per pivotal trial was 201 (range, 25-3,946). Twenty-six of the 34 pivotal trials (76%) had at least one methodologic bias. Breast imaging devices had a greater number of patients per pivotal trial (P = .009) and more prospective studies. With regard to all modalities, increased time to device approval correlated with weaker trial quality (r = 0.600, P assessing diagnostic technologies. Given that radiologic devices play a key role in modern medicine, further efforts should be made to increase transparency of clinical data leading to approval. Copyright © 2016 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  17. Solution preparation

    International Nuclear Information System (INIS)

    Seitz, M.G.

    1982-01-01

    Reviewed in this statement are methods of preparing solutions to be used in laboratory experiments to examine technical issues related to the safe disposal of nuclear waste from power generation. Each approach currently used to prepare solutions has advantages and any one approach may be preferred over the others in particular situations, depending upon the goals of the experimental program. These advantages are highlighted herein for three approaches to solution preparation that are currently used most in studies of nuclear waste disposal. Discussion of the disadvantages of each approach is presented to help a user select a preparation method for his particular studies. Also presented in this statement are general observations regarding solution preparation. These observations are used as examples of the types of concerns that need to be addressed regarding solution preparation. As shown by these examples, prior to experimentation or chemical analyses, laboratory techniques based on scientific knowledge of solutions can be applied to solutions, often resulting in great improvement in the usefulness of results

  18. Preparing Low Income Women for Today's Workplace: A Case Study on the Evolution of a Communications Model within a Job Training Program.

    Science.gov (United States)

    Baird, Irene C.; Towns, Kathryn

    PROBE (Potential Reentry Opportunities in Business and Education), a program conducted in Harrisburg and Lebanon, Pennsylvania, incorporated technological training with effective communication skills preparation for single female welfare parents. Goals of the program were to provide 20 single-parent welfare women with marketable computer and…

  19. Anti-infective medicine quality: analysis of basic product quality by approval status and country of manufacture

    Directory of Open Access Journals (Sweden)

    Bate R

    2012-07-01

    Full Text Available Roger Bate,1 Lorraine Mooney,2 Kimberly Hess,3 Julissa Milligan,1 Amir Attaran41American Enterprise Institute, Washington DC, USA; 2Africa Fighting Malaria, London, UK; 3Africa Fighting Malaria, Washington DC, USA; 4Faculty of Law and Medicine, University of Ottawa, Ottawa, CanadaBackground: Some medicines for sale in developing countries are approved by a stringent regulatory authority (SRA or the World Health Organization (WHO prequalification program; many of these are global brands. This study ascertains whether medicines approved by SRAs or the WHO perform better in simple quality tests than those that have not been approved by either.Methods: Over the past 4 years, 2652 essential drugs (products to treat malaria, tuberculosis, and bacterial infections were procured by covert shoppers from eleven African cities and eight cities in a variety of mid-income nations. All samples were assessed using the Global Pharma Health Fund eV Minilab® protocol to identify whether they were substandard, degraded, or counterfeit.Results: The failure rate among SRA-approved products was 1.01%, among WHO-approved products was 6.80%, and 13.01% among products that were not approved by either. African cities had a greater proportion of SRA- or WHO-approved products (31.50% than Indian cities (26.57%, but they also experienced a higher failure rate (14.21% than Indian cities (7.83%. The remainder of cities tested had both the highest proportion of approved products at 34.46% and the lowest failure rate at 2.70%. Products made in Africa had the highest failure rate at 25.77%, followed by Chinese products at 15.74%, Indian products at 3.70%, and European/US products, which failed least often, at 1.70%. Most worrying is that 17.65% of Chinese products approved by the WHO failed.Conclusion: The results strongly indicate that approval by either an SRA or the WHO is correlated with higher medicine quality at a statistically significant level. The comparatively high

  20. 30 CFR 18.95 - Approval of machines constructed of components approved, accepted or certified under Bureau of...

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Approval of machines constructed of components... APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.95 Approval of machines constructed of components approved...

  1. The Westinghouse Waste Isolation Division Management and Supervisor Training Program

    International Nuclear Information System (INIS)

    Gilbreath, B.

    1992-01-01

    The Westinghouse Waste Isolation Division (WID) is the management and operating contractor (MOC) for the Department of Energy's (DOE's) Waste Isolation Plant (WIPP). Managers and supervisors at DOE facilities such as the WIPP are required to complete extensive training. To meet this requirement, WID created a self-paced, self-study program known as Management and Supervisor Training (MAST). All WID managers and supervisors are required to earn certification through the MAST program. Selected employees are permitted to participate in MAST with prior approval from their manager and the Human Resources Manager. Initial MAST certification requires the completion of 31 modules. MAST participants check out modules and read them when convenient. When they are prepared, participants take module examinations. To receive credit for a given module, participants must score at least 80 percent on the examination. Lessons learned from the development, implementation, and administration are presented in this paper

  2. 76 FR 29680 - Approval and Disapproval and Promulgation of State Implementation Plan Revisions; Infrastructure...

    Science.gov (United States)

    2011-05-23

    ..., marketable permits, and auctions of emissions rights), as well as schedules and timetables for compliance as...) program as required by part C of the Act, and the State's minor NSR program as required by 110(a)(2)(C...), respectively. Minor NSR Finally, with regards to minor NSR, in this action EPA is proposing to approve Wyoming...

  3. The Rural Special Education Project: A School-Based Program That Prepares Special Educators to Teach Native American Students.

    Science.gov (United States)

    Prater, Greg; And Others

    1996-01-01

    A Northern Arizona University program prepares preservice special education teachers to work with Native American children and families. University students live on the Navajo reservation and receive practical classroom experience at Kayenta Unified School District (Arizona). Anglo students are paired with Navajo students who act as "cultural…

  4. Preparing Teens for Success: Building 21st Century Skills through a 4-H Work-Based Learning Program

    Directory of Open Access Journals (Sweden)

    Theresa M. Ferrari

    2008-06-01

    Full Text Available There is widespread concern that youth lack the skills essential for job success and are entering the workplace unprepared. To address issues of workforce preparation, Extension educators at an urban 4-H education center created the Job Experience and Training (JET program, a work-based learning program for teens. JET is conducted over a six-month period, culminating in an eight-week summer work experience in collaboration with a local park district. Supervisors and teens completed a performance appraisal measure based on SCANS workforce skills at two points during the program. Both teens and supervisors provided written comments addressing teens’ strengths and areas for growth, as well as comments on their satisfaction with the program itself. Overall, the experience appears to have produced improvements in teens’ workforce skills, as evidenced by their own self-assessment and that of their supervisors. We conclude with implications for conducting work-based learning programs.

  5. Improvement of the competitive program of woman’s pair in acrobatics by means of choreography at a stage of the specialized basic preparation

    Directory of Open Access Journals (Sweden)

    Petro Kyzim

    2016-04-01

    Full Text Available Purpose: to prove experimentally the technique of improvement of the competitive program of woman’s pair in acrobatics by means of choreography at a stage of the specialized basic preparation. Material & Methods: the following methods of the research were used: theoretical analysis and synthesis of data of special scientific and methodical literature; pedagogical supervision; pedagogical testing; methods of mathematical statistics. 10 competitive programs of woman’s pair in acrobatics are analyzed before and after the pedagogical experiment. Results: the estimated results of the technique of execution of the competitive program of each woman’s pair separately were received on the basis of a rating scale of criterion of implementation of the competitive program of woman’s pair in acrobatics (Rules of FIG, 2013–2016. The dynamic of the level of the competitive program of each woman’s pair separately is defined. Conclusions: it is established that additional resources of choreography influence significantly the level of the competitive program of woman’s pair in acrobatics at a stage of the specialized basic preparation

  6. A qualitative analysis of the performance measurement and outcome management procedures applied to the PLEBE Summer Program at the United States Naval Academy

    OpenAIRE

    Evans, James S.

    2002-01-01

    Approved for public release; distribution is unlimited. The United States Naval Academy is the premier source of officers for the Naval service. It is a four-year total immersion educational experience designed to develop midshipmen morally, mentally, and physically and prepare them for service as either a Naval or Marine Corps officer. The Fourth-Class Indoctrination (Plebe Summer) program is the first military training evolution for most members of the incoming plebe class. The seven-wee...

  7. 78 FR 5350 - Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2013-01-25

    ...] Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On December 7, 2012 Massachusetts submitted an application to...

  8. Drugs Approved for Breast Cancer

    Science.gov (United States)

    ... Ask about Your Treatment Research Drugs Approved for Breast Cancer This page lists cancer drugs approved by the ... are not listed here. Drugs Approved to Prevent Breast Cancer Evista (Raloxifene Hydrochloride) Raloxifene Hydrochloride Tamoxifen Citrate Drugs ...

  9. 78 FR 76383 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Science.gov (United States)

    2013-12-17

    ... purchase. Decision Date: April 5, 2013. FOR FURTHER INFORMATION CONTACT: Trang Tran, Seattle Airports... Approved in This Decision: $121,393,042. Earliest Charge Effective Date: August 1, 2014. Estimated Charge... planning and program administration. Decision Date: March 8, 2013. FOR FURTHER INFORMATION CONTACT: Steve...

  10. 78 FR 57208 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Science.gov (United States)

    2013-09-17

    ... notice also includes information on four applications, one approved in July 2012 and the other three... carousel 9 and oversized bag belt TU3. Terminal redevelopment program--design and associated technical.... Rehabilitate terminal access road. Administration fees. DECISION DATE: October 18, 2012. FOR FURTHER...

  11. U.S. Food and Drug Administration drug approval: slow advances in obstetric care in the United States.

    Science.gov (United States)

    Wing, Deborah A; Powers, Barbara; Hickok, Durlin

    2010-04-01

    The process for drug approval in the United States is complex and time-consuming. There are comparatively few drugs with U.S. Food and Drug Administration (FDA)-approved indications for obstetric use in this country at this time; however, several are under development. We review the process for drug approval and recount the approval histories of obstetric drugs reviewed in the recent past. We also outline the current status of two progestational agents that are under development. For a variety of reasons, including a small market compared with others such as cardiology or oncology, and the potential of being drawn into medical-legal litigation, sponsors are disinclined to pursue drug development for obstetric purposes in this country. We compare the procedures for review and approval of drugs in the United States with those in Europe, and note that recent changes within the FDA may result in not only more drugs being approved but also changes in labeling of already approved drugs. Special programs to facilitate drug development and reforms to modernize the process and improve safety are discussed. These may result in changes in labeling of already approved drugs. Obstacles such as funding and liability are also discussed.

  12. Drugs Approved for Thyroid Cancer

    Science.gov (United States)

    ... Ask about Your Treatment Research Drugs Approved for Thyroid Cancer This page lists cancer drugs approved by the ... that are not listed here. Drugs Approved for Thyroid Cancer Cabozantinib-S-Malate Caprelsa (Vandetanib) Cometriq (Cabozantinib-S-Malate) Doxorubicin ...

  13. A Cultural Approach to Understanding Professional Experiences of Foreign-Born Faculty in U.S. Educational Leadership Preparation Programs

    Science.gov (United States)

    Khrabrova, Iryna; Sanzo, Karen L.

    2013-01-01

    The purpose of this study was to investigate the professional experiences of foreign-born faculty members serving in U.S. educational leadership preparation programs, utilizing a cultural approach to discern their lived experiences related to professional life. Cultural values were explored as reflected in professional life experiences. The…

  14. Prepare SME in Facing AEC 2015 through English Training Program to Obtain the Export Market

    Directory of Open Access Journals (Sweden)

    Rianto Nurcahyo

    2015-09-01

    or the effect of two nominal variables and to measure the relation strength of each variable with other nominal variable (C as the coefficient of contingency. From the chi square method, difference from the SME before and after the Export English course training is expected to be found. The training will use classroom method. The title of this study is prepare SME in Facing AEC 2015 through English training program to obtain the export market.

  15. 78 FR 20073 - Adequacy of Oregon's Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2013-04-03

    ...] Adequacy of Oregon's Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection Agency... Oregon's approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final regulations... waste landfills by approved states. On June 14, 2012, Oregon submitted an application to EPA Region 10...

  16. REVIEW OF NRC APPROVED DIGITAL CONTROL SYSTEMS ANALYSIS

    International Nuclear Information System (INIS)

    Markman, D.W.

    1999-01-01

    Preliminary design concepts for the proposed Subsurface Repository at Yucca Mountain indicate extensive reliance on modern, computer-based, digital control technologies. The purpose of this analysis is to investigate the degree to which the U. S. Nuclear Regulatory Commission (NRC) has accepted and approved the use of digital control technology for safety-related applications within the nuclear power industry. This analysis reviews cases of existing digitally-based control systems that have been approved by the NRC. These cases can serve as precedence for using similar types of digitally-based control technologies within the Subsurface Repository. While it is anticipated that the Yucca Mountain Project (YMP) will not contain control systems as complex as those required for a nuclear power plant, the review of these existing NRC approved applications will provide the YMP with valuable insight into the NRCs review process and design expectations for safety-related digital control systems. According to the YMP Compliance Program Guidance, portions of various NUREGS, Regulatory Guidelines, and nuclear IEEE standards the nuclear power plant safety related concept would be applied to some of the designs on a case-by-case basis. This analysis will consider key design methods, capabilities, successes, and important limitations or problems of selected control systems that have been approved for use in the Nuclear Power industry. An additional purpose of this analysis is to provide background information in support of further development of design criteria for the YMP. The scope and primary objectives of this analysis are to: (1) Identify and research the extent and precedence of digital control and remotely operated systems approved by the NRC for the nuclear power industry. Help provide a basis for using and relying on digital technologies for nuclear related safety critical applications. (2) Identify the basic control architecture and methods of key digital control

  17. Ciprofloxacin Use in Hospitalized Children: Approved or Off-label?

    Science.gov (United States)

    Faghihi, Toktam; Tekmehdash, Leila Yavari; Radfar, Mania; Gholami, Kheirollah

    2017-01-01

    Fluoroquinolones are not routinely used as the first-line antimicrobial therapy in pediatrics. The American Academy of Pediatrics (AAP) and the United States Food and Drug Administration (FDA) approved fluoroquinolones on certain indications in children. The aim of this study was to evaluate to what extent and how ciprofloxacin is used on approved indication or as off-label. Besides, dose adequacy and treatment duration were assessed. In a 10-month observational study, all children receiving systemic ciprofloxacin were assessed. We classified ciprofloxacin prescription to an AAP/FDA or off-label indication. The off-label prescriptions were further categorized to justified and unjustified therapy subgroups. The AAP/FDA category and the justified subgroup constituted the appropriate prescriptions. During the study period, 32 patients were prescribed ciprofloxacin. In general, 37% (12) of prescriptions determined to be appropriate. Of the appropriate prescriptions, 7 were AAP/FDA-approved indications. Children with Crohn's disease with abdominal abscess and children with infectious bloody diarrhea constituted the off-label; justified therapy subgroup. Unjustified prescriptions mainly occurred in the presence of a suitable alternative antibiotic for ciprofloxacin. Mean ± SD of ciprofloxacin dose (mg/kg/day) and duration (days) were 21.25 ± 6.35 and 13.56 ± 8.48, respectively. Of the appropriate prescriptions, 41% were underdosed. Underdosing was more encountered in patients with cystic fibrosis. Duration of treatment of the appropriate prescriptions was determined to be appropriate. The majority of children were receiving ciprofloxacin off-label and in an inappropriate manner. This issue emphasizes that antimicrobial stewardship program on ciprofloxacin use in pediatric hospitals should be implemented. Further studies evaluating clinical and microbiological outcomes of these programs in children are needed.

  18. K Basin sludge packaging design criteria (PDC) and safety analysis report for packaging (SARP) approval plan

    International Nuclear Information System (INIS)

    Brisbin, S.A.

    1996-01-01

    This document delineates the plan for preparation, review, and approval of the Packaging Design Crieteria for the K Basin Sludge Transportation System and the Associated on-site Safety Analysis Report for Packaging. The transportation system addressed in the subject documents will be used to transport sludge from the K Basins using bulk packaging

  19. 77 FR 9865 - Clarification on the Division 1.1 Fireworks Approvals Policy

    Science.gov (United States)

    2012-02-21

    ... 173 [Docket No. PHMSA-2011-0157; Notice No. 11-6] Clarification on the Division 1.1 Fireworks.... 11-6 clarifying PHMSA's policy regarding the fireworks approvals program. Furthermore, in this... applications for Division 1.1 fireworks that have been examined and assigned a recommended shipping description...

  20. YouTube is the Most Frequently Used Educational Video Source for Surgical Preparation.

    Science.gov (United States)

    Rapp, Allison K; Healy, Michael G; Charlton, Mary E; Keith, Jerrod N; Rosenbaum, Marcy E; Kapadia, Muneera R

    The purpose of this study was to evaluate surgical preparation methods of medical students, residents, and faculty with special attention to video usage. Following Institutional Review Board approval, anonymous surveys were distributed to participants. Information collected included demographics and surgical preparation methods, focusing on video usage. Participants were questioned regarding frequency and helpfulness of videos, video sources used, and preferred methods between videos, reading, and peer consultation. Statistical analysis was performed using SAS. Surveys were distributed to participants in the Department of Surgery at the University of Iowa Hospitals and Clinics, a tertiary care center in Iowa City, Iowa. Survey participants included fourth-year medical students pursuing general surgery, general surgery residents, and faculty surgeons in the Department of Surgery. A total of 86 surveys were distributed, and 78 surveys were completed. This included 42 learners (33 residents, 9 fourth-year medical students) and 36 faculty. The overall response rate was 91%; 90% of respondents reported using videos for surgical preparation (learners = 95%, faculty = 83%, p = NS). Regarding surgical preparation methods overall, most learners and faculty selected reading (90% versus 78%, p = NS), and fewer respondents reported preferring videos (64% versus 44%, p = NS). Faculty more often use peer consultation (31% versus 50%, p YouTube (86%). Learners and faculty use different video sources. Learners use YouTube and Surgical Council on Resident Education (SCORE) Portal more than faculty (YouTube: 95% versus 73%, p YouTube was the preferred source. Posting surgical videos to YouTube may allow for maximal access to learners who are preparing for surgical cases. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  1. Manual for Preparing Individualized Education Programs.

    Science.gov (United States)

    Baylor, Terrill D.

    Presented are guidelines for developing an individualized program and services plan, an individual implementation plan, and daily activity and strategy plans for handicapped students. Instructions are outlined for utilizing forms related to planning and implementation of individualized education programs. Appended are sample forms. (SBH)

  2. 77 FR 16795 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-03-22

    .... SUMMARY: EPA is proposing to approve revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution, submitted to EPA by the Puerto Rico Environmental Quality Board (PREQB) on July 13...

  3. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-27

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation`s energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization`s ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization`s commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans.

  4. [Applications and approved projectsof general program, young scientist fund and fund for less developedregion of national natural science funds in discipline of Chinese materia medica, NSFC in 2012].

    Science.gov (United States)

    Huang, Ming-Qing; Han, Li-Wei; Wu, Xiu-Hong; Bi, Ming-Gang; Shang, Hong-Cai; Liu, Yun-Fang; He, Wei-Ming; Li, Dan-Dan; Dong, Yan; Wang, Chang-En

    2013-01-01

    The applications accepted and approved by general program, young scientist fund and fund for less developed region of national natural science funds in the discipline of Chinese materia medica, NSFC in 2012 have been introduced. The research contents of the funded projects in the popular research areas have been summarized and the problems in the applications have been analyzed to give a reference to the scientists in the field of Chinese materia medica.

  5. 30 CFR 401.12 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal year's...

  6. Personnel Preparation.

    Science.gov (United States)

    Fair, George, Ed.; Stodden, Robert, Ed.

    1981-01-01

    Three articles comprise a section on personnel preparation in vocational education. Articles deal with two inservice programs in career/vocational education for the handicapped and a project to train paraprofessionals to assist special educators in vocational education. (CL)

  7. Computer application in coal preparation industry in China

    Energy Technology Data Exchange (ETDEWEB)

    Lu, M.; Wu, L.; Ni, Q. (China Univ. of Mining and Technology, Xuzhou (China))

    1990-01-01

    This paper describes several packages of microcomputer programs developed for designing and managing the coal preparation plants. Three parts are included: Coal Cleaning Package (CCP), Coal Preparation Optimization Program (CPO) and Coal Preparation Computer Aided Design System (CPCAD). The function of CCP is: evaluating and predicting coal cleaning result. Coal presentation process modelling and optimization; coal preparation flowsheet design and optimization. The CPO is a nonlinear optimization program. It can simulate and optimize the profit for different flowsheet to get the best combination of the final products. The CPCAD was developed based upon AutoCAD and makes full use of AutoLISP, digitizer menus and AutoCAD commands, combining the functions provided by AutoCAD and the principle used in conventional coal preparation plant design, forming a designer-oriented CPCAD system. These packages have proved to be reliable, flexible and easy to learn and use. They are a powerful tool for coal preparation plant design and management. (orig.).

  8. 76 FR 22411 - Notice of Proposed Information Collection: Comment Request; Housing Counseling Program...

    Science.gov (United States)

    2011-04-21

    ... Information Collection: Comment Request; Housing Counseling Program--Application for Approval as a Housing Counseling Agency AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION: Notice. SUMMARY: The...: Title of Proposal: Housing Counseling Program--Application for Approval as a Housing Counseling Agency...

  9. 42 CFR 403.308 - State systems under demonstration projects-mandatory approval.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false State systems under demonstration projects..., DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of State... approval of a State system are met under § 403.304 (b)(1)-(10) and § 403.304(c), and, if appropriate § 403...

  10. AERA Statement on Use of Value-Added Models (VAM) for the Evaluation of Educators and Educator Preparation Programs

    Science.gov (United States)

    Educational Researcher, 2015

    2015-01-01

    The purpose of this statement is to inform those using or considering the use of value-added models (VAM) about their scientific and technical limitations in the evaluation of educators and programs that prepare teachers. The statement briefly reviews the background and current context of using VAM for evaluations, enumerates specific psychometric…

  11. Seizing the Future: How Ohio's Career-Technical Education Programs Fuse Academic Rigor and Real-World Experiences to Prepare Students for College and Careers

    Science.gov (United States)

    Guarino, Heidi; Yoder, Shaun

    2015-01-01

    "Seizing the Future: How Ohio's Career and Technical Education Programs Fuse Academic Rigor and Real-World Experiences to Prepare Students for College and Work," demonstrates Ohio's progress in developing strong policies for career and technical education (CTE) programs to promote rigor, including college- and career-ready graduation…

  12. 30 CFR 906.20 - Approval of Colorado abandoned mine land reclamation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado abandoned mine land reclamation plan. 906.20 Section 906.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO...

  13. The Effects of Situated Learning Through a Community Partnership in a Teacher Preparation Program

    Directory of Open Access Journals (Sweden)

    Shelly Meyers

    2013-08-01

    Full Text Available This article examines the value of using an alternative approach to college course instruction in an off-campus location, an agency for individuals with developmental disabilities. The situated learning model is an alternative to the traditional college course instructional approach for preservice teachers. This model immerses students in the actual setting where they can practice the skills and apply the concepts emphasized in the curriculum. Through a partnership between the college, the community agency, and a public school, graduate students in the special education program developed and implemented a life-skills curriculum for individuals with developmental disabilities, at the same time learning essential principles of delivering instruction. The school-aged students who participated in the study were from a racially mixed urban school district, while the adult clients from the community agency attended the program at the end of their community-based workday. Based on the results of surveys and focus group discussions, participants in the study indicated that the situated learning model of instruction in a community setting better prepared them in the acquisition and application of their teaching skills, and built their competence in developing educational programs for individuals with disabilities.

  14. 78 FR 40262 - Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of...

    Science.gov (United States)

    2013-07-03

    ... comments about our intention to request the Office of Management and Budget (OMB) approval to renew an... Ownership is a program that offers increased flexibility in aircraft ownership. Owners purchase shares of an...

  15. 76 FR 270 - Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2011-01-04

    ...] Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved Municipal Solid Waste Landfill (MSWLF) permit program. The approved modification allows the State..., EPA issued a final rule (69 FR 13242) amending the Municipal Solid Waste Landfill (MSWLF) criteria in...

  16. 77 FR 64343 - Notice of Availability: Test Tools and Test Procedures Approved for the Office of the National...

    Science.gov (United States)

    2012-10-19

    ... Approved for the Office of the National Coordinator for Health Information Technology (ONC) HIT Certification Program AGENCY: Office of the National Coordinator for Health Information Technology, Office of... performing the testing of EHR technology under the ONC HIT Certification Program, particularly when the...

  17. State Approved Programs of Teacher Preparation Offered by Kentucky Colleges and Universities (as of July 1, 1981). Teacher Education Circular #352.

    Science.gov (United States)

    Kentucky State Dept. of Education, Frankfort. Div. of Teacher Education and Certification.

    Characteristics of 23 Kentucky teacher education programs, at institutions which qualify for consideration under the Interstate Certification Contract for classroom teachers, are provided in this report. The process that culminates in institutional accreditation and teacher certification in Kentucky is outlined and is followed by a listing of the…

  18. Preparing Teachers to Use GIS: The Impact of a Hybrid Professional Development Program on Teachers' Use of GIS

    Science.gov (United States)

    Moore, Steven; Haviland, Don; Moore, William; Tran, Michael

    2016-01-01

    This article reports the findings of a 3-year study of a hybrid professional development program designed to prepare science and mathematics teachers to implement GIS in their classrooms. The study was conducted as part of the CoastLines Innovative Technology Experiences for Students and Teachers project funded by the National Science Foundation.…

  19. Technical procedures for utilities and solid waste: Environmental Field Program, Deaf Smith County site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    The evaluation of environmental issues and concerns and the addressing of statutory requirements are fundamental parts in the characterization of the site in Deaf Smith County, Texas for the US Department of Energy's Salt Repository Project (SRP). To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Utilities and Solid Waste considerations. This technical procedure (TP) has been developed to implement the field program described in the Utilities and Solid Waste Site Study Plan. The purpose and scope of the Utilities and Solid Waste Technical Procedure is to develop and implement a data collection procedure to fulfill the data base needs of the Utilities and Solid Waste SSP. The procedure describes a method of obtaining, assessing and verifying the capabilities of the regional service utilities and disposal contractors. This data base can be used to identify a preferred service source for the engineering contractor. The technical procedure was produced under the guidelines established in Technical Administrative Procedure No. 1.0, Preparation, Review and Approval of Technical Procedures

  20. Parental Influence on Drinking Behaviors at the Transition to College: The Mediating Role of Perceived Friends' Approval of High-Risk Drinking.

    Science.gov (United States)

    Rulison, Kelly L; Wahesh, Edward; Wyrick, David L; DeJong, William

    2016-07-01

    This study tested whether perceived parental approval of high-risk drinking is directly linked to alcohol-related outcomes or whether the link between perceived parental approval and these outcomes is mediated by perceived friends' approval of high-risk drinking. In fall 2009, 1,797 incoming first-year college students (49.7% female) from 142 U.S. colleges and universities completed a web-based survey before participating in an online substance use prevention program. The analytic sample included only 18- to 20-year-old freshmen students who had consumed alcohol in the past year. Students answered questions about perceived parental approval and perceived friends' approval of high-risk drinking. They also answered questions about their alcohol use (heavy episodic drinking, risky drinking behaviors), use of self-protective strategies (to prevent drinking and driving and to moderate alcohol use), and negative alcohol-related consequences (health, academic and work, social consequences, and drinking and driving). Mediation analyses controlling for the clustering of students within schools indicated that perceived parental approval was directly associated with more easily observable outcomes (e.g., academic- and work-related consequences, drinking and driving). Perceived friends' approval significantly mediated the link between perceived parental approval and outcomes that are less easily observed (e.g., alcohol use, health consequences). During the transition to college, parents may influence students' behaviors both directly (through communication) as well as indirectly (by shaping their values and whom students select as friends). Alcohol use prevention programs for students about to start college should address both parental and friend influences on alcohol use.

  1. The possibility of obtaining marketing authorization of orphan pharmaceutical compounding preparations: 3,4-DAP for Lambert-Eaton Myasthenic Syndrome.

    Science.gov (United States)

    de Wilde, Sofieke; de Jong, Maria G H; Lipka, Alexander F; Guchelaar, Henk-Jan; Schimmel, Kirsten J M

    2018-03-01

    Pharmaceutical compounding preparations, produced by (hospital) pharmacies, usually do not have marketing authorization. As a consequence, some of these pharmaceutical compounding preparations can be picked-up by a pharmaceutical company to obtain marketing authorization, often leading to price increases. An example is the 3,4-diaminopyridine slow release (3,4-DAP SR) tablets for Lambert-Eaton Myasthenic Syndrome (LEMS). In 2009 marketing authorization was given for the commercial immediate release phosphate salt of the drug, including a fifty-fold price increase compared to the pharmaceutical compounding preparation. Obtaining marketing authorization for 3,4-DAP SR by academia might have been a solution to prevent this price increase. To determine whether the available data of a pharmaceutical compounding preparation with long-term experience in regular care are adequate to obtain marketing authorization, 3,4-DAP SR is used as a case study. A retrospective qualitative case-study was performed. Initially, document analysis was executed by collecting the required data for marketing authorization in general and whether data of Firdapse® and 3,4-DAP SR met these requirements. Secondly, the (non-) available data of the two formulations were compared with each other to determine the differences in availability. At the time of approval, almost all data were available for both Firdapse® and 3,4-DAP SR. Conversely, much of the data used for the approval of Firdapse® originated from the 3,4-DAP immediate release (3,4-DAP IR) formulation. Only two bioequivalence studies and one pharmacology safety study was performed with Firdapse® before marketing authorization application. In conclusion, at time Firdapse® obtained approval, the data available did not differ substantially from 3,4-DAP SR, indicating that approval with 3,4-DAP SR would have been possible. We make a plea for approval of orphan medicinal products developed and manufactured by academic institutions as to

  2. Be Explicit: Geoscience Program Design to Prepare the Next Generation of Geoscientists

    Science.gov (United States)

    Mogk, D. W.

    2015-12-01

    The work of geoscientists is to engage inquiry, discovery and exploration of Earth history and processes, and increasingly, to apply this knowledge to the "grand challenges" that face humanity. Geoscience as a discipline is confronted with an incomplete geologic record, observations or data that are often ambiguous or uncertain, and a need to grasp abstract concepts such as temporal reasoning ('deep time'), spatial reasoning over many orders of magnitude, and complex system behavior. These factors provide challenges, and also opportunities, for training future geoscientists. Beyond disciplinary knowledge, it is also important to provide opportunities for students to engage the community of practice and demonstrate how to "be" a geoscientist. Inculcation of geoscience "ways of knowing" is a collective responsibility for geoscientists (teaching faculty and other professionals), at all instructional levels, in all geoscience disciplines, and for all students. A whole-student approach is recommended. Geoscience programs can be designed to focus on student success by explictly: 1) defining programmatic student learning outcomes , 2) embedding assessments throughout the program to demonstrate mastery, 3) aligning course sequences to reinforce and anticipate essential concepts/skills, 4) preparing students to be life-long learners; 5) assigning responsibilities to courses/faculty to ensure these goals have been met; 6) providing opportunities for students to "do" geoscience (research experiences), and 7) modeling professional behaviors in class, field, labs, and informal settings. Extracurricular departmental activities also contribute to student development such as journal clubs, colloquia, field trips, and internships. Successful design of geoscience department programs is informed by: the AGI Workforce program and Summit on the Future of Geoscience Education that define pathways for becoming a successful geoscientist; training in Geoethics; Geoscience Education

  3. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  4. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  5. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2006-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' They further state: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant| (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations(CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations

  6. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2007-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' They further state: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations

  7. Perceptions of Practicing Illinois Superintendents on the Relationship between Educational Leadership Administrative Preparation Programs and Their Perceived Job Performance Efficacy as Defined by the 2011 ELCC District Level Leadership Standards

    Science.gov (United States)

    Johnson, Bert Arthur

    2016-01-01

    This research study explored the perceptions of practicing Illinois superintendents regarding the efficacy of the work they do as a superintendent related to their experience in a superintendent preparation program. Although a multitude of research studies have been completed for both teacher and principal preparation programs, very little…

  8. 38 CFR 21.5230 - Programs of education.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Programs of education. 21...) VOCATIONAL REHABILITATION AND EDUCATION Post-Vietnam Era Veterans' Educational Assistance Under 38 U.S.C. Chapter 32 Programs of Education § 21.5230 Programs of education. (a) Approving the selected program of...

  9. 75 FR 53268 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2010-08-31

    ...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On June 28, 2010 New Hampshire submitted an application to EPA...

  10. 76 FR 22709 - Medicare and Medicaid Programs; Approval of the American Association for Accreditation of...

    Science.gov (United States)

    2011-04-22

    ... organizations that provide outpatient physical therapy and speech-language pathology services seeking to..., eligible beneficiaries may receive outpatient physical therapy and speech language pathology covered... seeking approval to provide outpatient physical therapy and speech language pathology services. The...

  11. 75 FR 44288 - Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of...

    Science.gov (United States)

    2010-07-28

    ...] Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of... requirements specified in the Standard on Overhead and Gantry Cranes (29 CFR 1910.179). DATES: Comments must be... requirements for: Marking the rated load of cranes; preparing certification records to verify the inspection of...

  12. 78 FR 72033 - Approval and Promulgation of Implementation Plans; Florida: General Requirements and Gasoline...

    Science.gov (United States)

    2013-12-02

    ...] Approval and Promulgation of Implementation Plans; Florida: General Requirements and Gasoline Vapor Control... Protection (FDEP), related to the State's gasoline vapor recovery program. This correcting amendment corrects... . SUPPLEMENTARY INFORMATION: This action corrects inadvertent errors in a rulemaking related to Florida's gasoline...

  13. 77 FR 37063 - Agency Information Collection Activities: Extension, Without Change, of a Currently Approved...

    Science.gov (United States)

    2012-06-20

    ... information technology, e.g., permitting electronic submission of responses. Overview of This Information... additional information should be directed to: John Ramsay, Program (Forms) Manager, U.S. Immigration and... Information Collection Activities: Extension, Without Change, of a Currently Approved Collection; Comment...

  14. 75 FR 29306 - Notice of Request for Extension of a Currently Approved Information Collection

    Science.gov (United States)

    2010-05-25

    ... Market News Branch, Livestock and Seed Program, Agricultural Marketing Service, U.S. Department of... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Doc. No. AMS-LS-10-0035] Notice of Request for Extension of a Currently Approved Information Collection AGENCY: Agricultural Marketing...

  15. Food Safety When Preparing Holiday Meals

    Science.gov (United States)

    ... Public Health Current: Remember Food Safety when Preparing Holiday Meals Services and Programs Regulation & Licensure Vital Records ... food safety is especially important as they prepare holiday meals. Many holiday dinners include meat and poultry, ...

  16. 76 FR 59134 - Medicare and Medicaid Programs; Approval of the Joint Commission's Continued Deeming Authority...

    Science.gov (United States)

    2011-09-23

    ... address the requirement that physician assistants, nurse practitioners, or clinical nurse specialists.... SUMMARY: This notice announces our decision to approve the Joint Commission for continued recognition as a... complaints against accredited facilities. ++ Survey review and decision-making process for accreditation. A...

  17. Recommendations for preparing the criticality safety evaluation of transportation packages

    International Nuclear Information System (INIS)

    Dyer, H.R.; Parks, C.V.

    1997-04-01

    This report provides recommendations on preparing the criticality safety section of an application for approval of a transportation package containing fissile material. The analytical approach to the evaluation is emphasized rather than the performance standards that the package must meet. Where performance standards are addressed, this report incorporates the requirements of 10 CFR Part 71. 12 refs., 6 figs., 8 tabs

  18. Perceptions on the Role of a Pre-Service Primary Teacher Education Program to Prepare Beginning Teachers to Teach Mathematics in Far North Queensland

    Science.gov (United States)

    Chigeza, Philemon; Jackson, Cliff; Neilson, Aaron

    2017-01-01

    This paper employs a collaborative auto-ethnographic method to reflect on perceptions and design of a pre-service primary teacher mathematics education program in a regional university and the role of that program to prepare beginning teachers for classroom mathematics practice in Far North Queensland. A four-phase analysis that reflected on: a…

  19. USL/DBMS NASA/PC R and D project C programming standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of programming standards intended to promote reliability, readability, and portability of C programs written for PC research and development projects is established. These standards must be adhered to except where reasons for deviation are clearly identified and approved by the PC team. Any approved deviation from these standards must also be clearly documented in the pertinent source code.

  20. 10 CFR 455.140 - Approval of applications from institutions and coordinating agencies for technical assistance and...

    Science.gov (United States)

    2010-01-01

    ... DEPARTMENT OF ENERGY ENERGY CONSERVATION GRANT PROGRAMS FOR SCHOOLS AND HOSPITALS AND BUILDINGS OWNED BY.... (h) Funds which become available to a grantee after the installation of all approved measures, due to...

  1. 49 CFR 107.709 - Processing of an application for approval, including an application for renewal or modification.

    Science.gov (United States)

    2010-10-01

    ... TRANSPORTATION HAZARDOUS MATERIALS AND OIL TRANSPORTATION HAZARDOUS MATERIALS PROGRAM PROCEDURES Approvals... before the disposition of an application. (b) At any time during the processing of an application, the...

  2. 78 FR 18336 - Public Water System Supervision Program Approval for the State of Michigan

    Science.gov (United States)

    2013-03-26

    ... and Copper Rule Short Term Revisions, and the Lead and Copper Rule Minor Revisions. These rules better... defined in 18 U.S.C. 1151. By approving these rules, EPA does not intend to affect the rights of federally recognized Indian Tribes in Michigan, nor does it intend to limit existing rights of the State of Michigan...

  3. TCLP Preparation and Analysis of K East Basin Composite Sludge Samples

    International Nuclear Information System (INIS)

    Silvers, K.L.; Wagner, J.J.; Steele, R.T.

    2000-01-01

    Sludge samples from the Hanford K East Basin were analyzed by the Toxicity Characterization Leaching Procedure (TCLP) to assist in the appropriate Resource Conservation and Recovery Act (RCIL4) designation of this material. Sludge samples were collected by Fluor Hanford, Inc. using the consolidated sludge sampling system (system that allows collection of a single sample from multiple sample locations). These samples were shipped to the Postirradiation Testing Laboratory (PTL, 327 Building) and then transferred to the Pacific Northwest National Laboratory (PNNL) Radiochemical Processing Laboratory (RPL, 325 Building) for recovery and testing. Two sludge composites were prepared, using the consolidated sludge samples, to represent K East canister sludge (sample KC Can Comp) and K East floor sludge (sample KC Floor Comp). Each composite was extracted in duplicate and analyzed in duplicate following pre-approved(a) TCLP extraction and analyses procedures. In addition, these samples and duplicates were analyzed for total RCRA metals (via acid digestion preparation). The work was conducted in accordance with the requirements of the Hanford Analytical Quality Assurance Requirements Document (HASQARD). A PNNL Quality Assurance Program compliant with J HASQARD was implemented for this effort. The results from the TCLP analyses showed that all RCRA metal concentrations were less than the TCLP limits for both the canister and floor composite samples and their respective duplicates

  4. Preparing emergency personnel in dialysis: a just-in-time training program for additional staffing during disasters.

    Science.gov (United States)

    Stoler, Genevieve B; Johnston, James R; Stevenson, Judy A; Suyama, Joe

    2013-06-01

    There are 341 000 patients in the United States who are dependent on routine dialysis for survival. Recent large-scale disasters have emphasized the importance of disaster preparedness, including supporting dialysis units, for people with chronic disease. Contingency plans for staffing are important for providing continuity of care for a technically challenging procedure such as dialysis. PReparing Emergency Personnel in Dialysis (PREP-D) is a just-in-time training program designed to train individuals having minimum familiarity with the basic steps of dialysis to support routine dialysis staff during a disaster. A 5-module educational program was developed through a collaborative, multidisciplinary effort. A pilot study testing the program was performed using 20 nontechnician dialysis facility employees and 20 clinical-year medical students as subjects. When comparing pretest and posttest scores, the entire study population showed a mean improvement of 28.9%, with dialysis facility employees and medical students showing improvements of 21.8% and 36.4%, respectively (P just-in-time training format. The knowledge gained by using the PREP-D program during a staffing shortage may allow for continuity of care for critical services such as dialysis during a disaster.

  5. Preparing the operating budget.

    Science.gov (United States)

    Williams, R B

    1983-12-01

    The process of preparing a hospital pharmacy budget is presented. The desired characteristics of a budget and the process by which it is developed and approved are described. Fixed, flexible, and zero-based budget types are explained, as are the major components of a well-developed budget: expense, workload, productivity, revenue, and capital equipment and other expenditures. Specific methods for projecting expenses and revenues, based on historical data, are presented along with a discussion of variables that must be considered in order to achieve an accurate and useful budget. The current shift in emphasis away from revenue capture toward critical analysis of pharmacy costs underscores the importance of budgetary analysis for hospital pharmacy managers.

  6. 75 FR 7561 - Notice of Request for Approval of a New Information Collection

    Science.gov (United States)

    2010-02-22

    ..., Alaska Native, Asian Pacific Islanders, persons with disabilities, or women farm and ranch operators will...), and the Risk Management Agency (RMA)], actual program delivery will be reviewed. The activities to be... Management and Budget approval. All comments will become a matter of public record. Dated: February 8, 2010...

  7. 48 CFR 1552.219-70 - Mentor-Protege Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Mentor-Protege Program... Mentor-Protege Program. As prescribed in 1519.203(a), insert the following clause: Mentor-Protege Program OCT 2000 (a) The Contractor has been approved to participate in the EPA Mentor-Protege program. The...

  8. 33 CFR 101.125 - Approved Alternative Security Programs.

    Science.gov (United States)

    2010-07-01

    ... 106 of this subchapter, as applicable: (a) American Gaming Association Alternative Security Program..., and Towboats and Barges, dated September 24, 2003. (c) Passenger Vessel Association Industry Standards...

  9. 77 FR 68076 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Redesignation of...

    Science.gov (United States)

    2012-11-15

    ... preserve the environmental benefits provided by CAIR, North Carolina v. EPA, 550 F.3d 1176, 1178 (DC Cir... CSR 19. See 71 FR 64468 (November 2, 2006) (approving NSR program into the SIP) and 77 FR 63736...

  10. 77 FR 16676 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-03-22

    ... for approval of revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution... Control of Atmospheric Pollution submitted on July 13, 2011 by the Puerto Rico Environmental Quality Board.... Regulation for the Control of Atmospheric Pollution Commonwealth Puerto Rico regulation effective date EPA...

  11. Directory of Certificates of Compliance for Radioactive Materials Packages. Summary report of NRC approved packages. Volume 1, Revision 8

    International Nuclear Information System (INIS)

    1985-10-01

    This directory contains a Summary Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Summary Report of NRC Approved Quality Assurance Programs for Radioactive Material Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure them that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program. Copies of the current approval may be obtained from the US Nuclear Regulatory Commission Public Document Room files (see Docket No. listed on each certificate) at 1717 H Street, Washington, DC 20555. Note that the general license of 10 CFR 71.12 does not authorize the receipt, possession, use or transfer of byproduct source, or special nuclear material; such authorization must be obtained pursuant to 10 CFR Parts 30 to 36, 40, 50, or 70

  12. Directory of certificates of compliance for radioactive materials packages. Summary report of NRC approved packages. Volume 1. Revision 9

    International Nuclear Information System (INIS)

    1986-10-01

    This directory contains a Summary Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Summary Report of NRC Approved Quality Assurance Programs for Radioactive Material Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and Corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Sections 71.12, it is the responsibility of the licensees to insure them that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program. Copies of the current approval may be obtained from the US Nuclear Regulatory Commission Public Document Room files (see Docket No. listed on each certificate) at 1717 H Street, Washington, DC 20555. Note that the general license of 10 CFR 71.12 does not authorize the receipt, possession, use or transfer of byproduct source, or special nuclear material; such authorization must be obtained pursuant to 10 CFR Parts 30 to 36, 40, 50, or 70

  13. Directory of certificates of compliance for radioactive materials packages. Summary report of NRC approved packages. Volume 1, Revision 7

    International Nuclear Information System (INIS)

    1984-11-01

    This directory contains a Summary Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Summary Report of NRC Approved Quality Assurance Programs for Radioactive Material Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program. Copies of the current approval may be obtained from the US Nuclear Regulatory Commission Public Document Room files (see Docket No. listed on each certificate) at 1717 H Street, Washington, DC 20555. Note that the general license of 10 CFR 71.12 does not authorize the receipt, possession, use or transfer of byproduct source, or special nuclear material; such authorization must be obtained pursuant to 10 CFR Parts 30 to 36, 40, 50, or 70

  14. 13 CFR 124.520 - Mentor/protege program.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Mentor/protege program. 124.520... § 124.520 Mentor/protege program. (a) General. The mentor/protege program is designed to encourage approved mentors to provide various forms of assistance to eligible Participants. This assistance may...

  15. Electronic Approval of Invoices (AEF)

    CERN Document Server

    2004-01-01

    With a view to the simplification of administrative procedures, AS and FI Departments have completed the second phase of the new procedure for the electronic approval of invoices via the EDH application. The aim of this new procedure is to rationalise the invoice approval process, notably by eliminating paper copies from the approval circuit. This will simplify the processing of invoices and facilitate their timely settlement, while at the same time maintaining a high level of security. Phase II includes handling the electronic approval process of invoices whose amounts do not correspond exactly to those of the associated orders. In such cases, budgetary approval is required for the entire invoiced amount. Further information can be obtained at : http://ais.cern.ch/projs/AEF/help/F_help.htm Phase II of the procedure will be introduced gradually with effect from April 2004. Finance Department, Accounts Payable Section Tel: 72295 Organisation and Procedures Tel: 75885 Information Technologies Department,...

  16. 44 CFR 78.3 - Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  17. Pedagogical Content Knowledge and Preparation of High School Physics Teachers

    Science.gov (United States)

    Etkina, Eugenia

    2010-01-01

    This paper contains a scholarly description of pedagogical practices of the Rutgers Physics/Physical Science Teacher Preparation program. The program focuses on three aspects of teacher preparation: knowledge of physics, knowledge of pedagogy, and knowledge of how to teach physics (pedagogical content knowledge--PCK). The program has been in place…

  18. 13 CFR 108.470 - SBA approval of merger, consolidation, or reorganization of NMVC Company.

    Science.gov (United States)

    2010-01-01

    ... BUSINESS ADMINISTRATION NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM Changes in Ownership, Structure, or Control Change in Structure of Nmvc Company § 108.470 SBA approval of merger, consolidation, or reorganization of NMVC Company. You may not merge, consolidate, change form of organization (corporation or...

  19. 75 FR 18142 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution...

    Science.gov (United States)

    2010-04-09

    ...The EPA is proposing to approve revisions to the Texas State Implementation Plan (SIP) that amend Title 30 of the Texas Administrative Code (TAC), Chapter 114, Control of Air Pollution from Motor Vehicles. The State submitted these revisions on May 15, 2006, October 10, 2006, January 17, 2008, and February 28, 2008. These revisions establish the Rebate Grant Process and the Texas Clean School Bus Program under the Texas Emissions Reduction Plan (TERP), further amend the TERP, and amend the Locally Enforced Motor Vehicle Idling Limitations. The EPA is proposing to approve these SIP revisions because they allow for clarity and consistency of the SIP requirements. The EPA is proposing to approve these revisions pursuant to section 110 of the Federal Clean Air Act (CAA).

  20. Marketing Approval of Ethical Kampo Medicines.

    Science.gov (United States)

    Hakamatsuka, Takashi

    2017-01-01

    Kampo medicine is an original traditional medicine in Japan. Currently, 148 ethical Kampo formulations (Kampo prescription drugs) are registered in the National Health Insurance Price List. Kampo medicines can be prescribed under the national insurance system, which shows that they are part of conventional medicine in Japan. Japan has a unified drug approval system that does not distinguish between Western and Kampo medicines, and both are subject to the same regulations. The application for the market approval of ethical Kampo medicines is based on the general notification for drugs, i.e., "Handling of Ethical Combination Drugs" in "Precautions Necessary When Applying for Drug Marketing Approval" (Yakushokushinsa Notification No. 1121-12 of November 21, 2014). Furthermore, applications for the market approval of ethical Kampo medicines should follow the Kampo-specific notification of "Handling of Ethical Kampo Medicines" (Yakushin Notification No. 804 of June 25, 1980). Data from comparative studies with standard decoctions must be submitted with approval applications according to Yakushin 2 Notification No. 120 of May 31, 1985. The safety, efficacy, and quality of Kampo medicines are comprehensively assured by the Japanese Pharmacopoeia, Good Manufacturing Practice, Good Agricultural and Collection Practices, marketing approval certificate, approval standard, and pharmacovigilance. I believe that the basic framework for the market approval of ethical Kampo medicines has been established as described above. The key factors for the practical application of superior manufacturing technology and research achievements and the promotion of drug development are the specific guidelines for the approval of drugs of herbal origin.

  1. 40 CFR 52.2122 - Approval status.

    Science.gov (United States)

    2010-07-01

    ... sources covered by CTGs issued by the previous January. (b) EPA disapproved South Carolina's generic...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) South Carolina § 52.2122 Approval status. (a) With the exceptions set forth in this subpart, the Administrator approves South Carolina's plans for...

  2. Building an Undergraduate Book Approval Plan for a Large Academic Library

    Directory of Open Access Journals (Sweden)

    Denise Koufogiannakis

    2007-05-01

    Full Text Available The University of Alberta Libraries (UAL, working with two book vendors, created large-scale undergraduate book approval plans to deliver new publications. Detailed selections profiles were created for many subject areas, designed to deliver books that would have been obvious choices by subject selectors. More than 5800 monographs were received through the book approval plans during the pilot period. These volumes proved to be highly relevant to users, showing twice as much circulation as other monographs acquired during the same time period. Goals achieved through this project include: release of selectors’ time from routine work, systematic acquisition of a broadly based high-demand undergraduate collection and faster delivery of undergraduate materials. This successful program will be expanded and incorporated into UAL’s normal acquisitions processes for undergraduate materials.

  3. Energy efficiency buildings program, FY 1980

    Energy Technology Data Exchange (ETDEWEB)

    1981-05-01

    A separate abstract was prepared on research progress in each group at LBL in the energy efficient buildings program. Two separate abstracts were prepared for the Windows and Lighting Program. Abstracts prepared on other programs are: Energy Performance of Buildings; Building Ventilation and Indoor Air Quality Program; DOE-21 Building Energy Analysis; and Building Energy Data Compilation, Analysis, and Demonstration. (MCW)

  4. Environmental assessment of radiological effluents from data gathering and maintenance operation on Three Mile Island Unit 2: interim criteria approved by the Commission on April 7,1980

    International Nuclear Information System (INIS)

    1980-05-01

    The staff is currently in the process of preparing a programmatic environmental impact statement (PEIS) for TMI-2 which will address all radiological releases that may occur as a result of the cleanup and recovery operations. These operations will begin after the PEIS is published in final form provided the proposed cleanup programs have been found to be environmentally acceptable. In the interim period it is necessary for the licensee to conduct data gathering and maintenance operations on the damaged reactor. The action of approval of these interim operations does not foreclose any of the options of the PEIS. In addition, regardless of what cleanup choice is made in the PEIS, the approval of these data gathering and maintenance operations enhance the ability of the licensee to maintain the reactor in a safe configuration and to plan effectively for recovery operations. This Environmental Impact Appraisal evaluates the effects on the environment of allowing these data gathering and maintenance operations to be conducted. These data gathering and maintenance operations do not include purging of the containment atmosphere, disposal of EPICOR-II water, or the treatment and disposal of high level radioactively contaminated water in the reactor building

  5. Preparing for the Profession: The Accounting Job Search and Beyond

    Science.gov (United States)

    Landgraf, Ellen L.; Stanko, Brian B.; Jinkerson, Darcia

    2012-01-01

    This paper provides a detailed description of a unique program focused on preparing students for entry into the accounting profession. The program, Preparing for the Profession, consisted of four distinct workshops provided to accounting majors during fall semester 2010. Planning for the program began a year earlier during a meeting of Accounting…

  6. 75 FR 48302 - Notice of Request for Extension of Approval of an Information Collection; Credit Account Approval...

    Science.gov (United States)

    2010-08-10

    ....gov ). FOR FURTHER INFORMATION CONTACT: For information on credit account approval for reimbursable..., at (301) 851-2908. SUPPLEMENTARY INFORMATION: Title: Credit Account Approval for Reimbursable... Inspection Service [Docket No. APHIS-2010-0071] Notice of Request for Extension of Approval of an Information...

  7. 78 FR 54617 - Notice of Request for Extension of Approval of an Information Collection; Credit Account Approval...

    Science.gov (United States)

    2013-09-05

    ...] Notice of Request for Extension of Approval of an Information Collection; Credit Account Approval for... (202) 799-7039 before coming. FOR FURTHER INFORMATION CONTACT: For information on credit account... Coordinator, at (301) 851-2908. SUPPLEMENTARY INFORMATION: Title: Credit Account Approval for Reimbursable...

  8. 78 FR 54862 - Information Collection; General Program Administration

    Science.gov (United States)

    2013-09-06

    ... Administration AGENCY: Farm Service Agency, USDA. ACTION: Notice; request for comments. SUMMARY: In accordance... associated with FSA's Farm Loan Programs (FLP) General Program Administration. The information collected is... Program Administration. OMB Control Number: 0560-0238. Expiration Date of Approval: 02/28/2014. Type of...

  9. 40 CFR 52.1772 - Approval status.

    Science.gov (United States)

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) North Carolina § 52.1772 Approval status. (a) With the exceptions set forth in this subpart, the Administrator approves North Carolina's plans for... CTGs issued by the previous January. (b) New Source review permits issued pursuant to section 173 of...

  10. Safety assessment of research reactors and preparation of the safety analysis report

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide presents guidelines, approved by international consensus, for the preparation, review and assessment of safety documentation for research reactors such as the Safety Analysis Report. While the Guide is most applicable to research reactors in the design and construction stage, it is also recommended for use during relicensing or reassessment of existing reactors

  11. "They Were Really Looking for a Male Leader for the Building": Gender, Identity and Leadership Development in a Principal Preparation Program.

    Science.gov (United States)

    Burton, Laura J; Weiner, Jennie M

    2016-01-01

    This study utilized a comparative case study analysis to investigate how gender influenced the experiences of participants in a leadership development program (principal preparation program) designed to lead public K-12 schools identified as requiring turnaround. We closely focused on two participants, a man and a woman, and compared the ways each participant made meaning of his/her experiences as developing leaders in the program. Although both participants conceptualized effective leadership in similar communally-oriented ways, the way they came to construct their identities as leaders varied greatly. These differences were largely influenced by different and, what appeared to be, gendered feedback occurring during the program and when participants entered the job market.

  12. They were really looking for a male leader for the building: Gender, identity and leadership development in a principal preparation program.

    Directory of Open Access Journals (Sweden)

    Laura J Burton

    2016-02-01

    Full Text Available This study utilized a comparative case study analysis to investigate how gender influenced the experiences of participants in a leadership development program (principal preparation program designed to lead public K-12 schools identified as requiring turnaround. We closely focused on two participants, a man and a woman, and compared the ways each participant made meaning of his/her experiences as developing leaders in the program. Although both participants conceptualized effective leadership in similar communally-oriented ways, the way they came to construct their identities as leaders varied greatly. These differences were largely influenced by different and, what appeared to be, gendered feedback occurring during the program and when participants entered the job market.

  13. Preparing participants for intergenerational interaction training for success

    CERN Document Server

    Hawkins, Melissa; Mcguire, Francis A

    2013-01-01

    Preparing Participants for Intergenerational Interaction: Training for Success examines established intergenerational programs and provides the training methods necessary for activity directors or practitioners to start a similar program. This book contains exercises that will help you train colleagues and volunteers for these specific programs and includes criteria for activity evaluations. Preparing Participants for Intergenerational Interaction will help you implement programs that enable older adults to build friendships, pass down their skills and knowledge to adolescents, and provide youths with positive role models. Discussing the factors that often limit the interaction of older adults with youths, this text stresses the importance of conveying information and history to younger generations. You will learn why the exchange between different generations is crucial to society and to the improvement of the community in which you live. Preparing Participants for Intergenerational Interaction provides you ...

  14. Aerospace engineering educational program

    Science.gov (United States)

    Craft, William; Klett, David; Lai, Steven

    1992-01-01

    The principle goal of the educational component of NASA CORE is the creation of aerospace engineering options in the mechanical engineering program at both the undergraduate and graduate levels. To accomplish this goal, a concerted effort during the past year has resulted in detailed plans for the initiation of aerospace options in both the BSME and MSME programs in the fall of 1993. All proposed new courses and the BSME aerospace option curriculum must undergo a lengthy approval process involving two cirriculum oversight committees (School of Engineering and University level) and three levels of general faculty approval. Assuming approval is obtained from all levels, the options will officially take effect in Fall '93. In anticipation of this, certain courses in the proposed curriculum are being offered during the current academic year under special topics headings so that current junior level students may graduate in May '94 under the BSME aerospace option. The proposed undergraduate aerospace option curriculum (along with the regular mechanical engineering curriculum for reference) is attached at the end of this report, and course outlines for the new courses are included in the appendix.

  15. 78 FR 37457 - Approval and Promulgation of Implementation Plans; State of Missouri; Infrastructure SIP...

    Science.gov (United States)

    2013-06-21

    ... ensure that the structural components of each state's air quality management program are adequate to meet... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R07-OAR-2013-0208; FRL-9825-7] Approval and... Fine Particulate Matter National Ambient Air Quality Standards AGENCY: Environmental Protection Agency...

  16. 7 CFR 1484.30 - How does FAS formalize its working relationship with approved Cooperators?

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false How does FAS formalize its working relationship with... FAS formalize its working relationship with approved Cooperators? FAS will notify each applicant in... sign the program agreement and submit the signed agreement to the Director, Marketing Operations Staff...

  17. 75 FR 35437 - Notice of Request for Extension of a Currently Approved Information Collection

    Science.gov (United States)

    2010-06-22

    ... from construction of a fire station with fire fighting and rescue equipment to financing a 911 emergency system. These facilities are designed to provide fire protection and emergency rescue services to... for a currently approved information collection in support of the program for Fire and Rescue Loans...

  18. 9 CFR 147.52 - Approved tests.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Approved tests. 147.52 Section 147.52 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... Approved Tests § 147.52 Approved tests. (a) The procedures for the bacteriological examination of poultry...

  19. 30 CFR 14.10 - Post-approval product audit.

    Science.gov (United States)

    2010-07-01

    ..., AND APPROVAL OF MINING PRODUCTS REQUIREMENTS FOR THE APPROVAL OF FLAME-RESISTANT CONVEYOR BELTS General Provisions § 14.10 Post-approval product audit. (a) Approved conveyor belts will be subject to... based. MSHA will select an approved conveyor belt to be audited; the selected belt will be...

  20. Program to develop acoustic emission: flaw relationship for inservice monitoring of nuclear pressure vessels. Progress report No. 1, July 1, 1976--February 1, 1977

    International Nuclear Information System (INIS)

    Hutton, P.H.; Schwenk, E.B.

    1977-03-01

    This is a laboratory research program to characterize acoustic emission (AE) from flaw growth and noise from innocuous sources in A533B Class 1 pressure vessel steel. The objectives are: characterize AE from a limited range of defects and material property conditions of concern to reactor pressure vessel integrity; characterize AE from innocuous sources (including defects); develop criteria for distinguishing significant flaws from innocuous sources; and develop an AE flaw damage model to serve as a basis for relating in-service AE to pressure vessel integrity. The purpose of the program is to build an experimental evaluation of the feasibility of detecting and analyzing flaw growth in reactor pressure boundaries by continuously monitoring for AE. A detailed program plan in the form of an analysis-before-test document has been prepared and approved

  1. Outage preparation milestones - A tool to improve planned outage performance

    International Nuclear Information System (INIS)

    Laplatney, Jere; Hwang, Euiyoub

    2006-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depend heavily on the performance of planned outages. Nuclear Power Plants who have successfully undertaken outage optimization projects have demonstrated than an effective Outage Preparation Milestone program is a key component of their improvement programs. This paper will provide background into the field of 'Outage Optimization' including the philosophy, general approach, and results obtained in the U. S. industry. The significant safety improvements afforded by properly implementing outage improvement programs will be explained. Some specific examples of outage improvements will be given including the adoption of a strong Outage Preparation Milestone Program. The paper will then describe the attributes of an effective Outage Preparation Milestone Program and list a set of specific key milestones. The key milestones are defined and the reasons for each are explained. Suggested due dates for each key milestone relative to the outage start date are provided. Successful implementation of an Outage Preparation Milestone program depends heavily upon the management tools and methods used to assure that the organization meets the milestones on time and in a quality fashion. These include methods to handle cases where milestones are not met - either partially or fully. KHNP is investigating implementing an improved Outage Preparation Milestone program for its fleet of reactors as part of its overall program to improve its performance of planned outages

  2. 25 CFR 26.34 - What type of job training assistance may be approved?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What type of job training assistance may be approved? 26.34 Section 26.34 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES JOB PLACEMENT AND TRAINING PROGRAM Training Services § 26.34 What type of job training assistance may be...

  3. Competition preparation guideline in undergraduate program of information system school of Industrial Engineering Telkom University based on knowledge conversion

    Science.gov (United States)

    Darmawan, F. R.; Soesanto, R. P.; Kurniawati, A.; Kurniawan, M. T.

    2017-12-01

    The role of higher education in the development of science and technology is not only from the contribution of the high-quality alumni but also from the research and relevant competition with the needs of development in such a country. In a competition, the student can improve their soft skill and academic skill such as analytical and critical thinking, communication skills and mental. The number of relevant competition by students is also included in accreditation clause, therefore student involvement in competition is seen as important for the undergraduate program in University. The most problem in university is the high turnover from the student. Bachelor program in Indonesia usually takes 4 years to complete, and the high turnover causes the student come and go as they are a graduate from the institution without preserving the knowledge and experience from the competition to other students. This research aims to develop a guidance for competition preparation in the university by using knowledge conversion. The object of this research is an information system undergraduate program in the school of industrial engineering Telkom University. The best practice selection is done by using factor rating method. Delphi method is used to identify the criteria, and AHP method is used to calculate the weight of each criterion. From the factor rating result it is known that from 3 respondent, best practice from respondent A (7.321) is used for preparing the programming competition in an undergraduate program of information system in the school of industrial engineering Telkom University. FGD is done to disseminate the selected best practice into the process stakeholder which is head of the student affair of the school of industrial engineering, students, and laboratory assistants. Future research can be done to create more comprehensive criteria for selecting the best practice.

  4. 7 CFR 1710.406 - Loan approval.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Loan approval. 1710.406 Section 1710.406 Agriculture... GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO ELECTRIC LOANS AND GUARANTEES Application Requirements and Procedures for Loans § 1710.406 Loan approval. (a) A loan is approved when the Administrator...

  5. 76 FR 58272 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Science.gov (United States)

    2011-09-20

    ... Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Engine Test Cells/ Stands... 20503. FOR FURTHER INFORMATION CONTACT: Learia Williams, Monitoring, Assistance, and Media Programs... address: williams[email protected] . SUPPLEMENTARY INFORMATION: EPA has submitted the following ICR to OMB...

  6. 76 FR 75845 - Approval and Promulgation of Implementation Plans; State of Tennessee: Prevention of Significant...

    Science.gov (United States)

    2011-12-05

    ... of air quality planning and air pollution control technology requirements. The CAA NSR program is... Environmental protection, Air pollution control, Intergovernmental relations, Ozone, Nitrogen oxides... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0483-201155; FRL-9498-8] Approval...

  7. 78 FR 22020 - Agency Information Collection Activities: Requests for Comments; Clearance of New Approval of...

    Science.gov (United States)

    2013-04-12

    ... Control Number: 2120-XXXX. Title: Safety Awareness, Feedback, and Evaluation (SAFE) Program. Form Numbers: No FAA forms are associated with this collection. Type of Review: Clearance of a new information... Activities: Requests for Comments; Clearance of New Approval of Information Collection: Safety Awareness...

  8. 75 FR 39932 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Science.gov (United States)

    2010-07-13

    ...; Comment Request; Recognition Application for Sustainable Water Leadership Program (Renewal) AGENCY... Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval... to: Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attention...

  9. 78 FR 73864 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Public...

    Science.gov (United States)

    2013-12-09

    ... information to inform program and policy decision-making. Need and Proposed Use of the Information: ASPE's..., validating and verifying information, processing and maintaining information, and disclosing and providing...-30D] Agency Information Collection Activities; Submission to OMB for Review and Approval; Public...

  10. Procedure for getting safety classed concrete structures approved by Finnish Radiation and Nuclear Safety Authority

    International Nuclear Information System (INIS)

    Halme, Ville-Juhani

    2015-01-01

    Posiva is preparing geological final disposal in the Finnish bedrock in Olkiluoto, Eurajoki. The final disposal facility includes encapsulation plant and underground repository. Most of the main civil structures are concrete structures. STUK is the supervising authority in civil structures. The National Building Code of Finland and STUK's Regulatory Guide on nuclear safety (YVL) are the most important instructions when constructing concrete structures into nuclear installation. Posiva has classified concrete structures in two classes according STUK's YVL-guidance: EYT (non-nuclear) and Safety Class 3 (SC 3, nuclear safety significance). When building SC 3 concrete structures, specific protocol must be followed. Protocol includes planned routines for design, construction, supervision, quality control (QC) and quality assurance (QA) activities. Documents relating concrete structures must be approved by Posiva and STUK before construction work. After structures have been designed and actual building is ongoing, there are two main steps. Before concreting, readiness inspection for concreting must be arranged. Readiness inspection will be arranged according to a specific plan and the date must be informed to STUK. After establishing readiness for concreting, casting work can begin. Once concrete structures are done, inspected and approved, final documentation according to a quality control plan will be reviewed by Posiva. After Posiva's approval, final documentation will be sent for STUK's approval. In the end STUK will give the permission for commissioning of the concrete structures after approved commissioning inspection. The document is made up of an abstract and a poster

  11. Programs of plant life management at NPP Dukovany

    International Nuclear Information System (INIS)

    Pochman, K.; Ruscak, M.; Brumovsky, M.

    2000-01-01

    The program of lifetime management at NPP Dukovany is oriented towards an effective usage of facilities while keeping their safety parameters, mainly concerning nuclear safety. The goal is to achieve maximum usage of the design lifetime under the condition of fulfilling above mentioned requirements. Evaluation procedures have been prepared for selected components. These are subsequently discussed and approved by the State Office of Nuclear Safety. The databases of original data are built up regarding the evaluated components. The input data are completed as well according to the approved procedures. Generally valid approaches based on the evaluation of all possible degradation mechanisms are modified regarding the original status of particular component. The procedures are oriented towards a quantification of residual lifetime. They employ knowledge of initiation and kinetics of degradation mechanisms. They also define mechanisms, which should be quantified. For irreplaceable components or components whose replacement is difficult, the program is focused to the control of operation conditions and inspection of facilities. However, they are again based on the knowledge of degradation kinetics. If at least some parts of the facility could be replaced, better material selection regarding the operation conditions is an option. Systems included into the ageing management system will be specified in the paper. Also, the measures will be identified which serve as a check of implementation of all possible stressors and degradation mechanisms into the first screening. The examples of lifetime evaluation of some systems and components will be given in the paper: reactor pressure vessel, reactor internals, steam generator tubes and feedwater piping. Specific approaches will be shown fro different original status of components and different operation conditions. (author)

  12. Vocations: The Link between Post-Compulsory Education and the Labour Market. What the Research Says For... Qualification & Approval Bodies

    Science.gov (United States)

    Wheelahan, Leesa; Buchanan, John; Yu, Serena

    2015-01-01

    This summary pulls together the relevant key findings for qualification and approval bodies from the research program "Vocations: The Link between Post-Compulsory Education and the Labour Market." The program was comprised of three different strands: (1) pathways from VET in Schools, (2) pathways within and between vocational education…

  13. Characterization of mixed waste for shipment to TSD Facilities Program

    International Nuclear Information System (INIS)

    Chandler, K.; Goyal, K.

    1995-01-01

    In compliance with the Federal Facilities Compliance Agreement, Los Alamos National Laboratory (LANL) is striving to ship its low-level mixed waste (LLMW) off-site for treatment and disposal. In order to ship LLMW off site to a commercial facility, LANL must request exemption from the DOE Order 5820.2A requirement that LLMW be shipped only to Department of Energy facilities. Because the process of obtaining the required information and approvals for a mixed waste shipment campaign can be very expensive, time consuming, and frustrating, a well-planned program is necessary to ensure that the elements for the exemption request package are completed successfully the first time. LANL has developed such a program, which is cost- effective, quality-driven, and compliance-based. This program encompasses selecting a qualified analytical laboratory, developing a quality project-specific sampling plan, properly sampling liquid and solid wastes, validating analytical data, documenting the waste characterization and decision processes, and maintaining quality records. The products of the program are containers of waste that meet the off-site facility's waste acceptance criteria, a quality exemption request package, documentation supporting waste characterization, and overall quality assurance for the process. The primary goal of the program is to provide an avenue for documenting decisions, procedures, and data pertinent to characterizing waste and preparing it for off-site treatment or disposal

  14. [College Discovery: America's First PREP Program].

    Science.gov (United States)

    Smith, James J., Jr.

    The Predischarge Education Program (PREP) is a federally funded program, approved in 1970, to help educationally disadvantaged servicemen continue their education. Many junior colleges are running or planning PREP projects in cooperation with military installations and the Veterans Administration. This paper describes the first year of one PREP…

  15. 76 FR 52658 - State Program Requirements; Approval of Application for Program Revision to the National...

    Science.gov (United States)

    2011-08-23

    ... program, pretreatment program, and miscellaneous non-domestic discharges; and Phase III includes mining... the EPA consider adopting stipulations related to jurisdiction issues and authorities of federally...

  16. 40 CFR 147.2500 - State-administered program.

    Science.gov (United States)

    2010-07-01

    ... State-administered program: (1) Chapter 144, Water, Sewage, Refuse, Mining and Air Pollution, Wisconsin... Section 147.2500 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS... Treatment Works, Wisconsin Administrative Code § 210.05 Natural Resources Board Order No. WQ-25-82, approved...

  17. Impact of multimodal preoperative preparation program on children undergoing surgery

    Directory of Open Access Journals (Sweden)

    Priya Reshma Aranha

    2017-01-01

    Full Text Available Background: The advanced era of technological development in child health care has resulted in more pediatric procedures being performed in various settings. Millions of children undergo surgery every year which is a stressful event. Many nonpharmacological strategies are being used to manage the preoperative fear and anxiety in children. The current study aims to assess the effectiveness of multimodal preoperative preparation program (MPPP on children undergoing surgery in terms of its effect on the psychophysiological parameters. Objective: The aim of this study is to assess the effectiveness of MPPP on the psychophysiological parameters of children undergoing surgery. Materials and Methods: A quasi-experimental study was conducted in a selected multi-specialty hospital. Using the purposive sampling technique, a total of 110 children aged 8–12 years were assigned to nonintervention (n = 55 and intervention (n = 55 groups, respectively. The MPPP was administered to the intervention group. The children in the nonintervention group received the routine preoperative care. Child's fear and anxiety was assessed on admission, prior to shifting the child to operation theater (OT, 24 and 48 h after surgery, whereas child's pulse, respiration, blood pressure (BP, and oxygen saturation was assessed on admission, prior to shifting the child to OT, 6, 12, 24, and 48 h after surgery and pain was assessed at 24 and 48 h after surgery. Results: The mean fear and anxiety scores of children were significantly lower in the intervention group than that of nonintervention group (P 0.05. This study also found that there is a significant association between the psychophysiological parameters of children with the selected demographic variables (P < 0.05. A positive correlation was found between the psychological and physiological parameters of children undergoing surgery. Conclusion: The MPPP is effective on psychophysiological parameters of children undergoing

  18. 42 CFR 495.344 - Approval of the State Medicaid HIT plan, the HIT PAPD and update, the HIT IAPD and update, and...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Approval of the State Medicaid HIT plan, the HIT PAPD and update, the HIT IAPD and update, and the annual HIT IAPD. 495.344 Section 495.344 Public... Requirements Specific to the Medicaid Program § 495.344 Approval of the State Medicaid HIT plan, the HIT PAPD...

  19. Streamlining the Capstone Process: A Time-Saving Approval System for Graduate Theses/Projects

    Science.gov (United States)

    Grooms, James; Kline, Douglas; Cummings, Jeffrey

    2016-01-01

    Capstones have become an integral part of many information systems programs, both at the undergraduate and graduate level. One of the challenges can be tracking the process from the start of the capstone to completion. This paper describes the analysis, design and implementation of a web application for the approval workflow of a master's program…

  20. Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

    Science.gov (United States)

    Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

  1. 78 FR 39313 - Notice of Intent To Prepare an Environmental Impact Statement for the Enefit American Oil Utility...

    Science.gov (United States)

    2013-07-01

    ... commercial oil shale mining, retorting, and upgrading operation located in Uintah County, Utah. Approval or... preparation of the EIS as defined in 40 CFR 1501.5. Agencies with legal jurisdiction or special expertise have...

  2. 40 CFR 52.1323 - Approval status.

    Science.gov (United States)

    2010-07-01

    ... on January 16, 1979 (44 FR 3274) are met. (b) The Administrator approves Rule 10 CSR 10-2.290 as.... (c) The Administrator approves Rule 10 CSR 10-2.230 as identified under § 52.1320, paragraph (c)(70... SIP would be the emission limits stated in the rule. (d) The Administrator approves Rule 10 CSR 10-5...

  3. 24 CFR 3282.7 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... program under the approved quality assurance manual, and the identity of the DAPIA (see definition z) which approved the designs and quality assurance manual used in the plant. Where appropriate under...) Quality Assurance Manual means a manual, prepared by each manufacturer for its manufacturing plants and...

  4. Erosion/corrosion concerns in feed preparation systems at the Defense Waste Processing Facility

    International Nuclear Information System (INIS)

    Gee, J.T.; Chandler, C.T.; Daugherty, W.L.; Imrich, K.J.; Jenkins, C.F.

    1997-01-01

    The Savannah River Site (SRS) has been operating a nuclear fuel cycle since the 1950's to produce nuclear materials in support of the national defense effort. The Department of Energy authorized the construction of the Defense Waste Processing Facility (DWPF) to immobilize the high level radioactive waste resulting from these processes as a durable borosilicate glass. The DWPF, after having undergone extensive testing, has been approved for operations and is currently immobilizing radioactive waste. To ensure reliability of the DWPF remote canyon processing equipment, a materials evaluation program was performed prior to radioactive operations to determine to what extent erosion/corrosion would impact design life of equipment. The program consisted of performing pre-service baseline inspections on critical equipment and follow-up inspections after completion of DWPF cold chemical demonstration runs. Non-destructive examination (NDE) techniques were used to assess erosion/corrosion as well as evaluation of corrosion coupon racks. These results were used to arrive at predicted equipment life for selected feed preparation equipment. It was concluded with the exception of the coil and agitator for the slurry mix evaporator (SME), which are exposed to erosive glass frit particles, all of the equipment should meet its design life

  5. 30 CFR 14.7 - Approval marking and distribution records.

    Science.gov (United States)

    2010-07-01

    ..., EVALUATION, AND APPROVAL OF MINING PRODUCTS REQUIREMENTS FOR THE APPROVAL OF FLAME-RESISTANT CONVEYOR BELTS General Provisions § 14.7 Approval marking and distribution records. (a) An approved conveyor belt must be marketed only under the name specified in the approval. (b) Approved conveyor belt must be legibly and...

  6. Intra-family role expectations and reluctance to change identified as key barriers to expanding vegetable consumption patterns during interactive family-based program for Appalachian low-income food preparers.

    Science.gov (United States)

    Brown, J Lynne; Wenrich, Tionni R

    2012-08-01

    Few Americans eat sufficient vegetables, especially the protective deep orange and dark green vegetables. To address this, a community-based wellness program to broaden vegetables served at evening meals targeting Appalachian food preparers and their families was tested in a randomized, controlled intervention. Food preparers (n=50) were predominately married (88%), white (98%), and female (94%), with several children living at home. Experimental food preparers (n=25) attended the program sessions and controls (n=25) were mailed relevant handouts and recipes. At program sessions, participants received nutrition information, hands-on cooking instruction, and prepared recipes to take home for family evaluation. As qualitative assessment, 10 couples from each treatment group (n=20 couples) were randomly selected for baseline and immediate post-intervention interviews to explore impact on the food preparer's family. These in-depth interviews with the food preparer and their adult partner were tape-recorded and transcribed verbatim. Two researchers conducted thematic analysis using constant comparison. Family flexibility about food choices was assessed using roles, rules, and power concepts from Family Systems Theory. Interviews at baseline revealed dinner vegetable variety was very limited because food preparers served only what everyone liked (a role expectation) and deferred to male partner and children's narrow vegetable preferences (power). Control couples reported no change in vegetable dinner variety post-intervention. Most experimental couples reported in-home tasting and evaluation was worthwhile and somewhat broadened vegetables served at dinners. But the role expectation of serving only what everyone liked and the practice of honoring powerful family members' vegetable preferences remained major barriers to change. Copyright © 2012 Academy of Nutrition and Dietetics. Published by Elsevier Inc. All rights reserved.

  7. Creating Next Generation Teacher Preparation Programs to Support Implementation of the Next Generation Science Standards and Common Core State Standards in K-12 Schools: An Opportunity for the Earth and Space Sciences

    Science.gov (United States)

    Geary, E. E.; Egger, A. E.; Julin, S.; Ronca, R.; Vokos, S.; Ebert, E.; Clark-Blickenstaff, J.; Nollmeyer, G.

    2015-12-01

    A consortium of two and four year Washington State Colleges and Universities in partnership with Washington's Office of the Superintendent of Public Instruction (OSPI), the Teachers of Teachers of Science, and Teachers of Teachers of Mathematics, and other key stakeholders, is currently working to improve science and mathematics learning for all Washington State students by creating a new vision for STEM teacher preparation in Washington State aligned with the Next Generation Science Standards (NGSS) and the Common Core State Standards (CCSS) in Mathematics and Language Arts. Specific objectives include: (1) strengthening elementary and secondary STEM Teacher Preparation courses and curricula, (2) alignment of STEM teacher preparation programs across Washington State with the NGSS and CCSS, (3) development of action plans to support implementation of STEM Teacher Preparation program improvement at Higher Education Institutions (HEIs) across the state, (4) stronger collaborations between HEIs, K-12 schools, government agencies, Non-Governmental Organizations, and STEM businesses, involved in the preparation of preservice STEM teachers, (5) new teacher endorsements in Computer Science and Engineering, and (6) development of a proto-type model for rapid, adaptable, and continuous improvement of STEM teacher preparation programs. A 2015 NGSS gap analysis of teacher preparation programs across Washington State indicates relatively good alignment of courses and curricula with NGSS Disciplinary Core Ideas and Scientific practices, but minimal alignment with NGSS Engineering practices and Cross Cutting Concepts. Likewise, Computer Science and Sustainability ideas and practices are not well represented in current courses and curricula. During the coming year teams of STEM faculty, education faculty and administrators will work collaboratively to develop unique action plans for aligning and improving STEM teacher preparation courses and curricula at their institutions.

  8. The ATLAS Forward Physics Program

    OpenAIRE

    Royon, C

    2010-01-01

    After a brief review of the approved ATLAS forward detector system we describe the main ATLAS forward physics program. This program currently includes such topics as soft and hard diffraction, double pomeron exchange, central exclusive production, rapidity gap survival, two photon physics, the determination of the total cross-section and the determination of the absolute luminosity A possible high luminosity upgrade program involving new forward proton detectors is also briefly reviewed. This...

  9. 78 FR 50360 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Infrastructure SIP...

    Science.gov (United States)

    2013-08-19

    ... ensure that the structural components of each state's air quality management program are adequate to meet... SIP. The Indiana Department of Environmental Management (IDEM) has requested that EPA approve these... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2011-0888; EPA-R05-OAR-2011-0969; EPA...

  10. 76 FR 9356 - Intent To Request Approval From OMB of One New Public Collection of Information: Baseline...

    Science.gov (United States)

    2011-02-17

    ... (BASE) Program AGENCY: Transportation Security Administration, DHS. ACTION: 60-day notice. SUMMARY: The... of Data Collection TSA's Surface Transportation Security Inspectors (STSIs) conduct BASE reviews... DEPARTMENT OF HOMELAND SECURITY Transportation Security Administration Intent To Request Approval...

  11. 7 CFR 58.141 - Alternate quality control program.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Alternate quality control program. 58.141 Section 58... Service 1 Quality Specifications for Raw Milk § 58.141 Alternate quality control program. When a plant has in operation an acceptable quality program, at the producer level, which is approved by the...

  12. Drugs Approved for Kidney (Renal Cell) Cancer

    Science.gov (United States)

    ... Your Treatment Research Drugs Approved for Kidney (Renal Cell) Cancer This page lists cancer drugs approved by the ... not listed here. Drugs Approved for Kidney (Renal Cell) Cancer Afinitor (Everolimus) Aldesleukin Avastin (Bevacizumab) Axitinib Bevacizumab Cabometyx ( ...

  13. Program package for data preparation of RISK events

    International Nuclear Information System (INIS)

    Denes, E.; Wagner, I.; Nagy, J.

    1980-01-01

    A FORTRAN program package written for the CDC-6500 computer is presented. The SMHV program is designed to transform data obtained from events of RISK streamer chamber by means of measuring SAMET or PUOS devices to the HEVAS data tormat format needed by the geometrical reconstruction program. Such a transformation provides the standartization of measurement data procession inside the RISK collaboration and capability of the direct input into program of event geometrical reconstruction registered on a film of RISK streamer chamber

  14. Preparing Elementary Prospective Teachers to Teach Early Algebra

    Science.gov (United States)

    Hohensee, Charles

    2017-01-01

    Researchers have argued that integrating early algebra into elementary grades will better prepare students for algebra. However, currently little research exists to guide teacher preparation programs on how to prepare prospective elementary teachers to teach early algebra. This study examines the insights and challenges that prospective teachers…

  15. Pedagogical content knowledge and preparation of high school physics teachers

    Directory of Open Access Journals (Sweden)

    Eugenia Etkina

    2010-08-01

    Full Text Available This paper contains a scholarly description of pedagogical practices of the Rutgers Physics/Physical Science Teacher Preparation program. The program focuses on three aspects of teacher preparation: knowledge of physics, knowledge of pedagogy, and knowledge of how to teach physics (pedagogical content knowledge—PCK. The program has been in place for 7 years and has a steady production rate of an average of six teachers per year who remain in the profession. The main purpose of the paper is to provide information about a possible structure, organization, and individual elements of a program that prepares physics teachers. The philosophy of the program and the coursework can be implemented either in a physics department or in a school of education. The paper provides details about the program course work and teaching experiences and suggests ways to adapt it to other local conditions.

  16. “They Were Really Looking for a Male Leader for the Building”: Gender, Identity and Leadership Development in a Principal Preparation Program

    Science.gov (United States)

    Burton, Laura J.; Weiner, Jennie M.

    2016-01-01

    This study utilized a comparative case study analysis to investigate how gender influenced the experiences of participants in a leadership development program (principal preparation program) designed to lead public K-12 schools identified as requiring turnaround. We closely focused on two participants, a man and a woman, and compared the ways each participant made meaning of his/her experiences as developing leaders in the program. Although both participants conceptualized effective leadership in similar communally-oriented ways, the way they came to construct their identities as leaders varied greatly. These differences were largely influenced by different and, what appeared to be, gendered feedback occurring during the program and when participants entered the job market. PMID:26909054

  17. 30 CFR 902.10 - State regulatory program approval.

    Science.gov (United States)

    2010-07-01

    ... Mining and Water Management, 3601 C Street, Suite 800, Anchorage, AK 99503-5925, Telephone: (907) 762... Section 902.10 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE ALASKA § 902.10 State...

  18. 78 FR 76310 - Agency Information Collection Activities: Submission to OMB for Review and Approval; Public...

    Science.gov (United States)

    2013-12-17

    ... collection will also provide information on CHWs' efforts to enroll clients and the successes and failures... forms; and 3. Client satisfaction surveys. ORHP is seeking approval from OMB for the three methods of... designed to gather information on successes and challenges associated with the program design and...

  19. 75 FR 81484 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-12-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9243-1] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading of Allowances...

  20. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  1. Trial endpoints for drug approval in oncology: Chemoprevention.

    Science.gov (United States)

    Beitz, J

    2001-04-01

    As with other drugs, new drug applications for marketing approval of chemopreventive drugs must include data from adequate and well-controlled clinical trials that demonstrate effectiveness and safety for the intended use. This article summarizes the regulatory requirements for traditional marketing approval, as well as for approval under the accelerated approval regulations. Unlike traditional approval, accelerated approval is based on a surrogate endpoint that is reasonably likely to predict clinical benefit. Discussions with the Food and Drug Administration (FDA) regarding the validity of trial endpoints that may serve as surrogates for clinical benefit for accelerated approval should take place as early as possible in drug development. Meetings with the FDA to discuss these issues may be requested throughout the clinical development of a new drug.

  2. Promoting Inclusive Holistic Graduate Admissions in Educational Leadership Preparation Programs

    Directory of Open Access Journals (Sweden)

    Christa Boske

    2018-04-01

    Full Text Available Aspiring and practicing school leaders often identify graduate degrees as playing a significant role in achieving educational access and engaging in building, district-wide, regional, state, and national decision-making regarding practice and policy impacting marginalized populations in K–12 U.S. schools. The rationale behind initiating discourse on graduate student involvement grows out of current policy and reform initiatives requiring increased accountability for improved student performance, especially for children from predetermined “subgroups” due to race, class, native language, and ability (i.e., emotional, social, cognitive, and physical. The call for more deliberate involvement in understanding graduate admissions also arises in regard to student attrition and retention concerns. Faculty often play an under-examined role as gatekeepers throughout the admissions process. The way in which they understand graduate requirements, holistic evaluation, and merit affords opportunities to positively address significant implications for racial equity and diversity in graduate education. To understand faculty reliance upon graduate admissions criteria that undermine espoused university strategic plans, college-level diversity goals, and programmatic decision-making, four professors across the U.S. explore graduate admissions processes and the significance of implementing holistic admissions criteria. We present a holistic graduate admissions conceptual model for school leadership preparation programs to consider when increasing equity and access for minoritized candidates.

  3. 76 FR 59863 - Application and Approval Process for New Programs

    Science.gov (United States)

    2011-09-27

    ... jobs or occupations stemming from the program. We invite comments on the proposed wage analysis... description of the CIP to Sec. 600.2, Definitions. Under this section, the CIP would be defined as ``a taxonomy of instructional program classifications and descriptions developed by the U.S. Department of...

  4. 76 FR 57022 - Coastal Zone Management Program: Illinois

    Science.gov (United States)

    2011-09-15

    ... DEPARTMENT OF COMMERCE National Oceanic And Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and...: Illinois has submitted a coastal management program to NOAA for approval under the Coastal Zone Management...

  5. Preparing Instructional Objectives: Agony or Ecstasy?

    Science.gov (United States)

    Roberts, Wesley K.

    This paper 1) discusses the problems encountered in preparing objectives for instructional programs; 2) describes an informal research project in which seven instructional designers working on the same project attempted to determine agreement on an objective; and 3) suggests how to prepare objectives so that difficulties can be minimized. One…

  6. 75 FR 2899 - Self-Regulatory Organizations; New York Stock Exchange LLC; Order Approving Proposed Rule Change...

    Science.gov (United States)

    2010-01-19

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-61333; File No. SR-NYSE-2009-117] Self-Regulatory Organizations; New York Stock Exchange LLC; Order Approving Proposed Rule Change Amending Its... regulatory program. III. Discussion and Commission's Findings After careful review, the Commission finds that...

  7. Trends in global approvals of biotech crops (1992-2014).

    Science.gov (United States)

    Aldemita, Rhodora R; Reaño, Ian Mari E; Solis, Renando O; Hautea, Randy A

    2015-01-01

    With the increasing number of genetically modified (GM) events, traits, and crops that are developed to benefit the global population, approval of these technologies for food, feed, cultivation and import in each country may vary depending on needs, demand and trade interest. ISAAA established a GMO Approval Database to document global approvals of biotech crops. GM event name, crops, traits, developer, year of approval for cultivation, food/feed, import, and relevant dossiers were sourced from credible government regulatory websites and biosafety clearinghouses. This paper investigates the trends in GM approvals for food, feed and cultivation based on the number of approving countries, GM crops, events, and traits in the last 23 y (1992-2014), rationale for approval, factors influencing approvals, and their implications in GM crop adoption. Results show that in 2014, there was an accumulative increase in the number of countries granting approvals at 29 (79% developing countries) for commercial cultivation and 31 (70% developing countries) for food and 19 (80% developing developing) for feed; 2012 had the highest number of approving countries and cultivation approvals; 2011 had the highest number of country approvals for feed, and 2014 for food approvals. Herbicide tolerance trait had the highest events approved, followed by insect tolerance traits. Approvals for food product quality increased in the second decade. Maize had the highest number of events approved (single and stacked traits), and stacked traits product gradually increased which is already 30% of the total trait approvals. These results may indicate understanding and acceptance of countries to enhance regulatory capability to be able to benefit from GM crop commercialization. Hence, the paper provided information on the trends on the growth of the GM crop industry in the last 23 y which may be vital in predicting future GM crops and traits.

  8. 40 CFR 52.2352 - Change to approved plan.

    Science.gov (United States)

    2010-07-01

    ... Utah's approved State Implementation Plan (SIP). This rule language pertains to State Sales Tax... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Change to approved plan. 52.2352... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Utah § 52.2352 Change to approved...

  9. Perceived social approval and condom use with casual partners among youth in urban Cameroon

    Directory of Open Access Journals (Sweden)

    Meekers Dominique

    2011-08-01

    Full Text Available Abstract Background HIV prevention programs targeting youth often emphasize the role of peers, and assume that youths will model their behavior after their peers'. We challenge this view; we argue that adopting a given behavior requires social approval, and that youths do not necessarily turn to peers for such approval. This study analyzes survey data on youths in urban Cameroon to 1 identify which type of persons youths look to for social approval, and 2 establish how important social approval by these persons is for condom use among youths. Methods We analyzed data from three survey waves (2000, 2002, and 2003 of a reproductive health survey conducted among urban Cameroonian youth (aged 15-24. Only respondents who reported having at least one casual partner in the past year were retained for the analysis. Bivariate analyses and structural equation modeling were used to examine relationships among perceived social approval, attitudes towards condoms and condom use. Results The data show that only 3% of youths named their friends as people whose opinion they valued, while 93% mentioned family members. The perceived approval of condom use by these persons had a significant positive effect on the frequency of condom use among youths. The frequency of condom use was also affected by the respondents' attitudes toward condom use, the range of persons with whom they discussed reproductive health matters, whether they were enrolled in school, socioeconomic status, their self-efficacy, perceived severity of AIDS, risk perception and sexual risk behavior. The perceived social approval of condom use and the respondents' own condom attitudes were correlated. Conclusions Our analysis demonstrates that perceived social approval facilitates the adoption of condom use among urban Cameroonian youth. However, youths tend to value the opinions of family members much more than the opinions of their peers. These results suggest that interventions targeting youths

  10. Research reactor preparations for the air shipment of highly enriched uranium from Romania

    International Nuclear Information System (INIS)

    Bolshinsky, I.; Allen, K.J.; Biro, L.L.; Budu, M.E.; Zamfir, N.V.; Dragusin, M.; Paunoiu, C.; Ciocanescu, M.

    2010-01-01

    In June 2009 two air shipments transported both unirradiated (fresh) and irradiated (spent) Russian-origin highly enriched uranium (HEU) nuclear fuel from two research reactors in Romania to the Russian Federation (RF) for conversion to low enriched uranium (LEU). The Institute for Nuclear Research at Pitesti (SCN Pitesti) shipped 30.1 kg of HEU fresh fuel pellets to Dimitrovgrad, Russia and the Horia Hulubei National Institute of Physics and Nuclear Engineering (IFIN-HH) shipped 23.7 kilograms of HEU spent fuel assemblies from the VVR-S research reactor at Magurele, Romania, to Ozersk, Russia. Both HEU shipments were coordinated by the Russian Research Reactor Fuel Return Program (RRRFR) as part of the U.S. Department of Energy Global Threat Reduction Initiative (GTRI), were managed in Romania by the National Commission for Nuclear Activities Control (CNCAN), and were conducted in cooperation with the Russian Federation State Corporation for Atomic Energy Rosatom and the International Atomic Energy Agency (IAEA). Both shipments were transported by truck to and from respective commercial airports in Romania and the Russian Federation and stored at secure nuclear facilities in Russia until the material is converted into low enriched uranium. These shipments resulted in Romania becoming the 3rd country under the RRRFR program and the 14th country under the GTRI program to remove all HEU. This paper describes the research reactor preparations and license approvals that were necessary to safely and securely complete these air shipments of nuclear fuel. (author)

  11. The Evolution of Approval Services.

    Science.gov (United States)

    Warzala, Martin

    1994-01-01

    Describes major developments in book approval plans used by academic libraries for acquisition and for information dissemination and document distribution services based on approval-like concepts. Topics addressed include publishers; marketing; the impact of library automation; value-added services; the economic climate; the influence of…

  12. Approval plans issues and innovations

    CERN Document Server

    Katz, Linda S

    2013-01-01

    How can you, as an acquisition librarians, keep current on the output of hundreds of publishers? The answer, of course, is that you cannot. For over 30 years, approval plans have been used by librarians to acquire current titles, save staff time, and build core collections. Even today, these reasons seem appropriate, as libraries try to maintain up-to-date collections and control personnel and operating budgets. However, as shown in Approval Plans: Issues and Innovations, the use of approval plans is not so simple and straightforward; their use is subject to complex procedures and policies--an

  13. A Comparison of Inter-Professional Education Programs in Preparing Prospective Teachers and Speech and Language Pathologists for Collaborative Language-Literacy Instruction

    Science.gov (United States)

    Wilson, Leanne; McNeill, Brigid; Gillon, Gail T.

    2016-01-01

    Ensuring teacher and speech and language pathology graduates are prepared to work collaboratively together to meet the diverse language literacy learning needs of children is an important goal. This study investigated the efficacy of a 3-h inter-professional education program focused on explicit instruction in the language skills that underpin…

  14. Defense Acquisitions: Assessments of Selected Weapon Programs

    Science.gov (United States)

    2017-03-01

    Figure 17: Examples of Knowledge Scorecards 61 Page vi GAO-17-333SP Assessments of Selected Weapon Programs...programs. Page 61 GAO-17-333SP Assessments of Selected Weapon Programs Figure 17: Examples of Knowledge Scorecards Pursuant to a...had direct access to the USD AT&L and other senior acquisition officials, and some approval authorities were delegated to lower levels. For example

  15. A survey of object oriented languages in programming environments

    OpenAIRE

    Haakonsen, Harald

    1987-01-01

    Approved for public release; distribution is unlimited This thesis addresses object oriented programming languages; and a restrictive definition of object oriented programming languages is presented and defended. Differences between programming languages are discussed and related to interactive integrated programming environments. Topics related to user friendly interface to the computer system and modem programming practice are discussed. The thesis especially addresses features in ...

  16. 75 FR 69909 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-11-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9226-3] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... four revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking...

  17. 78 FR 4796 - Approval and Promulgation of Implementation Plans; South Carolina: New Source Review-Prevention...

    Science.gov (United States)

    2013-01-23

    ... (NO X ) and Sulfur Dioxide (SO 2 ) Budget Trading Program General Provisions. EPA took final action to... monoxide, carbon dioxide, carbonic acid, metallic carbides, or carbonates, and ammonium carbonate) which... NAAQS and the 2008 lead NAAQS. Further, EPA is proposing to approve South Carolina's removal of the 1...

  18. 48 CFR 750.7105 - Approving authorities.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Extraordinary Contractual Actions To Protect Foreign Policy Interests of the United States 750.7105 Approving authorities. All authority to approve actions...

  19. A user-friendly robotic sample preparation program for fully automated biological sample pipetting and dilution to benefit the regulated bioanalysis.

    Science.gov (United States)

    Jiang, Hao; Ouyang, Zheng; Zeng, Jianing; Yuan, Long; Zheng, Naiyu; Jemal, Mohammed; Arnold, Mark E

    2012-06-01

    Biological sample dilution is a rate-limiting step in bioanalytical sample preparation when the concentrations of samples are beyond standard curve ranges, especially when multiple dilution factors are needed in an analytical run. We have developed and validated a Microsoft Excel-based robotic sample preparation program (RSPP) that automatically transforms Watson worklist sample information (identification, sequence and dilution factor) to comma-separated value (CSV) files. The Freedom EVO liquid handler software imports and transforms the CSV files to executable worklists (.gwl files), allowing the robot to perform sample dilutions at variable dilution factors. The dynamic dilution range is 1- to 1000-fold and divided into three dilution steps: 1- to 10-, 11- to 100-, and 101- to 1000-fold. The whole process, including pipetting samples, diluting samples, and adding internal standard(s), is accomplished within 1 h for two racks of samples (96 samples/rack). This platform also supports online sample extraction (liquid-liquid extraction, solid-phase extraction, protein precipitation, etc.) using 96 multichannel arms. This fully automated and validated sample dilution and preparation process has been applied to several drug development programs. The results demonstrate that application of the RSPP for fully automated sample processing is efficient and rugged. The RSPP not only saved more than 50% of the time in sample pipetting and dilution but also reduced human errors. The generated bioanalytical data are accurate and precise; therefore, this application can be used in regulated bioanalysis.

  20. 40 CFR 52.183 - Small business assistance program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arkansas § 52.183 Small business assistance... a Small Business Stationary Source Technical and Environmental Compliance Assistance Program...

  1. Evaluating and Selecting Sport Management Undergraduate Programs.

    Science.gov (United States)

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1998-01-01

    States that the accelerated growth of sport management undergraduate programs that began in the 1980s has continued into the current decade. There are currently 180 sport management major programs in American colleges and universities. Describes the sports management approval process and suggests useful strategies to evaluate sport management…

  2. 75 FR 36059 - Notice of Request for Extension and Revision of a Currently Approved Information Collection

    Science.gov (United States)

    2010-06-24

    ... Internet at http://www.regulations.gov . SUPPLEMENTARY INFORMATION: Title: Marketing Orders for Fruit Crops... Revision of a currently approved information collection. Abstract: Marketing order programs provide an... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Doc. No. AMS-FV-10-0033; FV10-902-1NC...

  3. 75 FR 5940 - Notice of Request for Extension and Revision of a Currently Approved Information Collection

    Science.gov (United States)

    2010-02-05

    ... Approved Information Collection AGENCY: Agricultural Marketing Service, USDA. ACTION: Notice and request... information collection, Federal-State Marketing Improvement Program (FSMIP). DATES: Comments on this notice... INFORMATION: FSMIP is authorized under Section 204(b) of the Agricultural Marketing Act of 1946 (7 U.S.C. 1621...

  4. Vedolizumab: first global approval.

    Science.gov (United States)

    Poole, Raewyn M

    2014-07-01

    Vedolizumab [Entyvio(®) (US, Europe)], a humanized monoclonal antibody α4β7 integrin receptor antagonist, has been developed by Millennium Pharmaceuticals (d/b/a Takeda Pharmaceuticals International) for the treatment of ulcerative colitis and Crohn's disease. Vedolizumab has received its first global approval for the treatment of ulcerative colitis and Crohn's disease in the US, for use in adult patients with moderate-to-severe disease who have had an inadequate response, loss of response or intolerance to one or more standard therapies (corticosteroids, immunomodulators or tumour necrosis factor-α inhibitor) or demonstrated dependence on corticosteroids. Vedolizumab has since been approved for ulcerative colitis and Crohn's disease in the EU, Norway, Iceland and Liechtenstein. This article summarizes the milestones in the development of vedolizumab leading to its first approval for the treatment of ulcerative colitis and Crohn's disease.

  5. Training Accreditation Program

    International Nuclear Information System (INIS)

    1989-01-01

    The Training Accreditation Program establishes the objectives and criteria against which DOE nuclear facility training is evaluated to determine its readiness for accreditation. Training programs are evaluated against the accreditation objectives and criteria by facility personnel during the initial self-evaluation process. From this self-evaluation, action plans are made by the contractor to address the scope of work necessary in order to upgrade any deficiencies noted. This scope of work must be formally documented in the Training Program Accreditation Plan. When reviewed and approved by the responsible Head of the Field Organization and cognizant Program Secretarial Office, EH-1 concurrence is obtained. This plan then becomes the document which guides accreditation efforts for the contractor

  6. 19 CFR 115.55 - Termination of approval.

    Science.gov (United States)

    2010-04-01

    ... vehicle by a major repair or alteration of any of the essential features required in § 115.51. Repairs by... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Individual Road Vehicles § 115.55 Termination of approval. Approval of a road...

  7. 20 CFR 617.22 - Approval of training.

    Science.gov (United States)

    2010-04-01

    .... Perkins Vocational and Applied Technology Education Act, and employers). (i) This means that training is...) Conditions for approval. Training shall be approved for an adversely affected worker if the State agency...) available for an adversely affected worker. (i) This means that for the worker for whom approval of training...

  8. NPS TINYSCOPE program management

    OpenAIRE

    Turner, Christopher Gordon.

    2010-01-01

    Approved for public release; distribution is unlimited This master's thesis introduces the program management and concept of operations of the TINYSCOPE Program. TINYSCOPE is a 6U CubeSat designed as a low-cost and easily replaceable imaging spacecraft that can produce tactically relevant imagery data. Tactical requirements in this context would emphasize "good enough" image resolution with a rapid-response tasking loop and high revisit rate. The TINYSCOPE project intends to demonstra...

  9. Successful Innovations in Educational Leadership Preparation

    Science.gov (United States)

    Gordon, Stephen P.; Oliver, John; Solis, Rachel

    2016-01-01

    The purpose of this study was to identify and describe successful innovations in educational leadership preparation programs. Professors of educational leadership from across the nation nominated innovations of 12 programs. Based on review of descriptions of the innovations provided by nominees, further documentation on the innovations was…

  10. 29 CFR 95.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ...., recipients need not obtain such prior written approvals) unless one of the conditions included in paragraph... is expected to exceed the needs of the recipient for the project period by more than $5,000 or five...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  11. 20 CFR 638.502 - Job Corps basic education program.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Job Corps basic education program. 638.502... education program. The Job Corps Director shall prescribe or provide for basic education curricula to be... coordination with regional offices, shall review and approve the basic education program at each center. Center...

  12. 14 CFR 91.1097 - Pilot and flight attendant crewmember training programs.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Pilot and flight attendant crewmember... RULES Fractional Ownership Operations Program Management § 91.1097 Pilot and flight attendant crewmember training programs. (a) Each program manager must establish and maintain an approved pilot training program...

  13. 40 CFR 52.1935 - Small business assistance program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1935 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  14. 40 CFR 52.991 - Small business assistance program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Louisiana § 52.991 Small business assistance... a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to meet...

  15. 30 CFR 75.1108 - Approved conveyor belts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Approved conveyor belts. 75.1108 Section 75... Fire-Resistant Hydraulic Fluids on Underground Equipment § 75.1108 Approved conveyor belts. (a) Until December 31, 2009 conveyor belts placed in service in underground coal mines shall be: (1) Approved under...

  16. Participatory three dimensional mapping for the preparation of landslide disaster risk reduction program

    Science.gov (United States)

    Kusratmoko, Eko; Wibowo, Adi; Cholid, Sofyan; Pin, Tjiong Giok

    2017-07-01

    This paper presents the results of applications of participatory three dimensional mapping (P3DM) method for fqcilitating the people of Cibanteng' village to compile a landslide disaster risk reduction program. Physical factors, as high rainfall, topography, geology and land use, and coupled with the condition of demographic and social-economic factors, make up the Cibanteng region highly susceptible to landslides. During the years 2013-2014 has happened 2 times landslides which caused economic losses, as a result of damage to homes and farmland. Participatory mapping is one part of the activities of community-based disaster risk reduction (CBDRR)), because of the involvement of local communities is a prerequisite for sustainable disaster risk reduction. In this activity, participatory mapping method are done in two ways, namely participatory two-dimensional mapping (P2DM) with a focus on mapping of disaster areas and participatory three-dimensional mapping (P3DM) with a focus on the entire territory of the village. Based on the results P3DM, the ability of the communities in understanding the village environment spatially well-tested and honed, so as to facilitate the preparation of the CBDRR programs. Furthermore, the P3DM method can be applied to another disaster areas, due to it becomes a medium of effective dialogue between all levels of involved communities.

  17. 76 FR 55148 - Self-Regulatory Organizations; BATS Exchange, Inc.; Order Approving Proposed Rule Change To Adopt...

    Science.gov (United States)

    2011-09-06

    ...-Regulatory Organizations; BATS Exchange, Inc.; Order Approving Proposed Rule Change To Adopt Rules for the...-4 thereunder,\\2\\ a proposed rule change to adopt rules for the qualification, listing, and delisting... the Proposal The Exchange proposes rules to adopt a program for the qualification, listing, and...

  18. 76 FR 52996 - Public Company Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim...

    Science.gov (United States)

    2011-08-24

    ... Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim Program of Inspection Related to Audits of Brokers and Dealers August 18, 2011. I. Introduction On June 21, 2011, the Public... that would be imposed on different categories of registered public accounting firms and classes of...

  19. 77 FR 65627 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2

    Science.gov (United States)

    2012-10-30

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2012-0169; FRL-9745-5] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2 Emissions From Bioenergy and other Biogenic Sources Under the Prevention of Significant Deterioration Program AGENCY: Environmental Protection...

  20. 78 FR 75437 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Order Granting Approval of Proposed Rule...

    Science.gov (United States)

    2013-12-11

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-71004; File No. SR-Phlx-2013-101] Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Order Granting Approval of Proposed Rule Change Regarding the Short Term Options Program December 6, 2013. I. Introduction On October 3, 2013, NASDAQ OMX PHLX LLC...