WorldWideScience

Sample records for preliminary test plan

  1. GRIST-2 preliminary test plan and requirements for fuel fabrication and preirradiation

    International Nuclear Information System (INIS)

    Tang, I.M.; Harmon, D.P.; Torri, A.

    1978-12-01

    The preliminary version of the GRIST-2 test plan has been developed for the planned initial 5 years (1984 to 1989) of TREAT-Upgrade in-pile tests. These tests will be employed to study the phenomenology and integral behavior of GCFR core disruptive accidents (CDAs) and to support the Final Safety Analysis Report (FSAR) CDA analyses for the demonstration plant licensing. The preliminary test plan is outlined. Test Phases I and II are for the fresh fuel (preconditioned or not) CDA behavior at the beginning-of-life (BOL) reactor state. Phase III is for the reactor state that contains irradiated fuel with a saturated content of helium and fission gas. Phase IV is for larger bundle tests and scaling effects

  2. Preliminary rock mechanics laboratory: Investigation plan

    International Nuclear Information System (INIS)

    Oschman, K.P.; Hummeldorf, R.G.; Hume, H.R.; Karakouzian, M.; Vakili, J.E.

    1987-01-01

    This document presents the rationale for rock mechanics laboratory testing (including the supporting analysis and numerical modeling) planned for the site characterization of a nuclear waste repository in salt. This plan first identifies what information is required for regulatory and design purposes, and then presents the rationale for the testing that satisfies the required information needs. A preliminary estimate of the minimum sampling requirements for rock laboratory testing during site characterization is also presented. Periodic revision of this document is planned

  3. Preliminary design county plan Zeeland

    International Nuclear Information System (INIS)

    1987-01-01

    The preliminary design 'Streekplan Zeeland' (Country plan Zeeland, with regard to the location of additional nuclear power plants in Zeeland, the Netherlands) has passed through a consultation and participation round. Thereupon 132 reactions have been received. These have been incorporated and answered in two notes. This proposal deals with the principal points of the preliminary design and treats also the remarks of the committees Environmental (town and country) Planning (RO), Provincial (town and country) Planning Committee (PPC) and Association of Communities of Zeeland (VZG), on the reply notes. The preliminary design with the modifications, collected in appendix 3, is proposed to be the starting point in the drawing-up of the design-country-plan. This design subsequently will pass the formal country-plan procedure. (author). 1 fig

  4. ERG and GRG review of the draft of ''preliminary test plan for in situ testing from an exploratory shaft in salt - October 1983''

    International Nuclear Information System (INIS)

    Kalia, H.N.

    1986-03-01

    The Engineering Review Group (ERG) and Geologic Review Group (GRG) were established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate engineering- and geologic-related issues in the US Department of Energy's nuclear waste repository program. The January 1984 meeting of the ERG and GRG reviewed the In Situ Test Plan (ISTP) titled ''Preliminary Test Plan for In Situ Testing From an Exploratory Shaft in Salt - October 1983.'' This report documents the ERG's and GRG's comments and recommendations on this subject and the ONWI responses to the specific points raised by the ERG and GRG. 6 refs., 2 figs., 1 tab

  5. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  6. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of shaft liner tests as part of the large shaft development test proposed for the Hanford Site in support of the repository development program. The objectives of these tests are to develop techniques for measuring liner alignment (straightness), both construction assembly alignment and downhole cumulative alignment, and to assess the alignment information as a real time feedback to aid the installation procedure. The test plan is based upon installing a 16 foot ID shaft liner into a 20 foot diameter shaft to a depth of 1000 feet. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs

  7. Tunnel boring waste test plan

    International Nuclear Information System (INIS)

    Patricio, J.G.

    1984-03-01

    The test plan has been prepared in anticipation of the need to excavate certain repository openings by relying upon mechanical excavation techniques. The test plan proposes that specific technical issues can be resolved and key design parameters defined by excavating openings in basalt near the surface, utilizing a full face tunnel boring machine (TBM). The purpose and objective of this type of testing will define the overall feasibility and attributes of mechanical excavation in basalt. The test plan recognizes that although this technology is generally available for underground construction for some geologic settings, the current state of technology for excavation in basalt is limited and the potential for improvement is considerable. The test plan recommends that it is economically advantageous to conduct additional testing in the laboratory to allow refinement of this plan based on the laboratory results. Thus, this test plan is considered preliminary in nature, with respect to detailed testing recommendations. However, the gross design attributes and resource requirements of a near-surface TBM demonstration are considered to be valid. 15 refs., 7 figs., 3 tabs

  8. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  9. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  10. Preliminary test results for post irradiation examination on the HTTR fuel

    International Nuclear Information System (INIS)

    Ueta, Shohei; Umeda, Masayuki; Sawa, Kazuhiro; Sozawa, Shizuo; Shimizu, Michio; Ishigaki, Yoshinobu; Obata, Hiroyuki

    2007-01-01

    The future post-irradiation program for the first-loading fuel of the HTTR is scheduled using the HTTR fuel handling facilities and the Hot Laboratory in the Japan Materials Testing Reactor (JMTR) to confirm its irradiation resistance and to obtain data on its irradiation characteristics in the core. This report describes the preliminary test results and the future plan for a post-irradiation examination for the HTTR fuel. In the preliminary test, fuel compacts made with the same SiC-coated fuel particle as the first loading fuel were used. In the preliminary test, dimension, weight, fuel failure fraction, and burnup were measured, and X-ray radiograph, SEM, and EPMA observations were carried out. Finally, it was confirmed that the first-loading fuel of the HTTR showed good quality under an irradiation condition. The future plan for the post-irradiation tests was described to confirm its irradiation performance and to obtain data on its irradiation characteristics in the HTTR core. (author)

  11. Preliminary plan for treating mixed waste

    International Nuclear Information System (INIS)

    Vandegrift, G.F.; Conner, C.; Hutter, J.C.; Leonard, R.A.; Nunez, L.; Sedlet, J.; Wygmans, D.G.

    1993-06-01

    A preliminary waste treatment plan was developed for disposing of radioactive inorganic liquid wastes that contain hazardous metals and/or hazardous acid concentrations at Argonne National Laboratory. This plan, which involves neutralization and sulfide precipitation followed by filtration, reduces the concentration of hazardous metals and the acidity so that the filtrate liquid is simply a low-level radioactive waste that can be fed to a low-level waste evaporator

  12. Radiation Testing on State-of-the-Art CMOS: Challenges, Plans, and Preliminary Results

    Science.gov (United States)

    LaBel, Kenneth A.; Cohn, Lewis M.

    2009-01-01

    At GOMAC 2007 and 2008, we discussed a variety of challenges for radiation testing of modern semiconductor devices and technologies [1, 2]. In this presentation, we provide more specific details in this on-going investigation focusing on out-of-the-box lessons observed for providing radiation effects assurances as well as preliminary test results.

  13. On Preliminary Test Estimator for Median

    OpenAIRE

    Okazaki, Takeo; 岡崎, 威生

    1990-01-01

    The purpose of the present paper is to discuss about estimation of median with a preliminary test. Two procedures are presented, one uses Median test and the other uses Wilcoxon two-sample test for the preliminary test. Sections 3 and 4 give mathematical formulations of such properties, including mean square errors with one specified case. Section 5 discusses their optimal significance levels of the preliminary test and proposes their numerical values by Monte Carlo method. In addition to mea...

  14. Preliminary Validation and Verification Plan for CAREM Reactor Protection System

    International Nuclear Information System (INIS)

    Fittipaldi, Ana; Maciel Felix

    2000-01-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan

  15. 76 FR 78183 - Preliminary Plan for Retrospective Review Under E.O. 13579

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF JUSTICE Parole Commission 28 CFR Part 2 [Docket No. USPC-2011-01] Preliminary Plan for Retrospective Review Under E.O. 13579 AGENCY: United States Parole Commission, Justice. ACTION: Request for comments. SUMMARY: The U.S. Parole Commission is asking for comments on its preliminary plan...

  16. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  17. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  18. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    Science.gov (United States)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  19. LASL experimental engineered waste burial facility: design considerations and preliminary plan

    International Nuclear Information System (INIS)

    DePoorter, G.L.

    1980-01-01

    The LASL Experimental Engineered Waste Burial Facility is a part of the National Low-Level Waste Management Program on Shallow-Land Burial Technology. It is a test facility where basic information can be obtained on the processes that occur in shallow-land burial operations and where new concepts for shallow-land burial can be tested on an accelerated basis on an appropriate scale. The purpose of this paper is to present some of the factors considered in the design of the facility and to present a preliminary description of the experiments that are initially planned. This will be done by discussing waste management philosophies, the purposes of the facility in the context of the waste management philosophy for the facility, and the design considerations, and by describing the experiments initially planned for inclusion in the facility, and the facility site

  20. Test Room Stability Plan

    International Nuclear Information System (INIS)

    1993-01-01

    This plan documents the combination of designs, installations, programs, and activities that ensures that the underground excavations at the Waste Isolation Pilot Plant (WIPP), in which transuranic (TRU) waste may be emplaced during the Test Phase, will remain sufficiently stable and safe during that time. The current ground support systems installed at the WIPP are the result of over ten years of data collection from hundreds of geomechanical instruments and thousands of hours of direct observation of the changing conditions of the openings. In addition, some of the world's most respected experts on salt rock mechanics have provided input in the design process and concurrence on the suitability of the final design. The general mine rockbolt pattern and the ground support system for the test rooms are designed to specifically address the fracture and deformation geometries observed today at the WIPP. After an introductory chapter, this plan describes the general underground design, then proceeds to an account of general ground support performance, and finally focuses on the details of the special test room ground support systems. One such system already installed in Room 1, Panel 1, is described in comprehensive detail. Other test rooms in Panel 1, whether full-size or smaller, will be equipped with systems that ensure stability to the same or equivalent extent. They will benefit from the experience gained in the first test room, which in turn benefitted from the data and knowledge accumulated during previous stages (e.g., the Site and Preliminary Design Validation program) of the project

  1. Solar Central Receiver Prototype Heliostat. Volume II. Phase II planning (preliminary)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    A currently planned DOE program will develop and construct a 10 MW/sub e/ Pilot Plant to demonstrate the feasibility and operational characteristics of Solar Central Receiver Power Generation. The field of heliostats is a major element of the Solar Central Receiver Power Generation system. The primary objective of the program described is to establish and verify the manufacturability, performance, durability, and maintenance requirements of the commercial plant heliostat design. End products of the 16 month effort include: (1) design, fabrication, and test of heliostats; (2) preliminary designs of manufacturing, assembly, installation, and maintenance processes for quantity production; (3) detailed design of critical tooling or other special equipment for such processes; (4) refined cost estimates for heliostats and maintenance; and (5) an updated commercial plant heliostat preliminary design. The program management and control system is discussed. (WHK)

  2. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  3. School Improvement Plans and Student Achievement: Preliminary Evidence from the Quality and Merit Project in Italy

    Science.gov (United States)

    Caputo, Andrea; Rastelli, Valentina

    2014-01-01

    This study provides preliminary evidence from an Italian in-service training program addressed to lower secondary school teachers which supports school improvement plans (SIPs). It aims at exploring the association between characteristics/contents of SIPs and student improvement in math achievement. Pre-post standardized tests and text analysis of…

  4. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  5. Preliminary results of steel containment vessel model test

    International Nuclear Information System (INIS)

    Matsumoto, T.; Komine, K.; Arai, S.

    1997-01-01

    A high pressure test of a mixed-scaled model (1:10 in geometry and 1:4 in shell thickness) of a steel containment vessel (SCV), representing an improved boiling water reactor (BWR) Mark II containment, was conducted on December 11-12, 1996 at Sandia National Laboratories. This paper describes the preliminary results of the high pressure test. In addition, the preliminary post-test measurement data and the preliminary comparison of test data with pretest analysis predictions are also presented

  6. Plan for decommissioning the Tokamak Fusion Test Reactor

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Walton, G.R.

    1993-01-01

    The Tokamak Fusion Test Reactor (TFTR) Project is in the planning phase of developing a decommissioning project. A Preliminary Decontamination and Decommissioning (D ampersand D) Plan has been developed which provides a framework for the baseline approach, and the cost and schedule estimates. TFTR will become activated and contaminated with tritium after completion of the deuterium-tritium (D-T) experiments. Hence some of the D ampersand D operations will require remote handling. It is expected that all of the waste generated will be low level radioactive waste (LLW). The objective of the D ampersand D Project is to make TFTR Test Cell available for use by a new fusion experiment. This paper discusses the D ampersand D objectives, the facility to be decommissioned, estimates of activation, the technical (baseline) approach, and the assumptions used to develop cost and schedule estimates

  7. Preliminary Technology Maturation Plan for Immobilization of High-Level Waste in Glass Ceramics

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Crum, Jarrod V.; Sevigny, Gary J.; Smith, G L.

    2012-09-30

    A technology maturation plan (TMP) was developed for immobilization of high-level waste (HLW) raffinate in a glass ceramics waste form using a cold-crucible induction melter (CCIM). The TMP was prepared by the following process: 1) define the reference process and boundaries of the technology being matured, 2) evaluate the technology elements and identify the critical technology elements (CTE), 3) identify the technology readiness level (TRL) of each of the CTE’s using the DOE G 413.3-4, 4) describe the development and demonstration activities required to advance the TRLs to 4 and 6 in order, and 5) prepare a preliminary plan to conduct the development and demonstration. Results of the technology readiness assessment identified five CTE’s and found relatively low TRL’s for each of them: • Mixing, sampling, and analysis of waste slurry and melter feed: TRL-1 • Feeding, melting, and pouring: TRL-1 • Glass ceramic formulation: TRL-1 • Canister cooling and crystallization: TRL-1 • Canister decontamination: TRL-4 Although the TRL’s are low for most of these CTE’s (TRL-1), the effort required to advance them to higher values. The activities required to advance the TRL’s are listed below: • Complete this TMP • Perform a preliminary engineering study • Characterize, estimate, and simulate waste to be treated • Laboratory scale glass ceramic testing • Melter and off-gas testing with simulants • Test the mixing, sampling, and analyses • Canister testing • Decontamination system testing • Issue a requirements document • Issue a risk management document • Complete preliminary design • Integrated pilot testing • Issue a waste compliance plan A preliminary schedule and budget were developed to complete these activities as summarized in the following table (assuming 2012 dollars). TRL Budget Year MSA FMP GCF CCC CD Overall $M 2012 1 1 1 1 4 1 0.3 2013 2 2 1 1 4 1 1.3 2014 2 3 1 1 4 1 1.8 2015 2 3 2 2 4 2 2.6 2016 2 3 2 2 4 2 4

  8. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule

  9. Plans and Preliminary Results of Fundamental Studies of Ice Crystal Icing Physics in the NASA Propulsion Systems Laboratory

    Science.gov (United States)

    Struk, Peter; Tsao, Jen-Ching; Bartkus, Tadas

    2017-01-01

    This paper describes plans and preliminary results for using the NASA Propulsion Systems Lab (PSL) to experimentally study the fundamental physics of ice-crystal ice accretion. NASA is evaluating whether this facility, in addition to full-engine and motor-driven-rig tests, can be used for more fundamental ice-accretion studies that simulate the different mixed-phase icing conditions along the core flow passage of a turbo-fan engine compressor. The data from such fundamental accretion tests will be used to help develop and validate models of the accretion process. This paper presents data from some preliminary testing performed in May 2015 which examined how a mixed-phase cloud could be generated at PSL using evaporative cooling in a warmer-than-freezing environment.

  10. Preliminary waste acceptance requirements for the planned Konrad repository

    International Nuclear Information System (INIS)

    Warnecke, E.; Brennecke, P.

    1987-01-01

    The Physikalisch-Technische Bundesanstalt (PTB) has established Preliminary Waste Acceptance Requirements for the planned Konrad repository. These requirements were developed, in accordance with the Safety Criteria of the Reactor Safety Commission, with the help of a site specific safety assessment; they are under the reservation of the plan approval procedure, which is still in progress. In developing waste acceptance requirements, the PTB fulfills one of its duties as the institute responsible for waste disposal and gives guidelines for waste conditioning to waste producers and conditioners. (orig.) [de

  11. Preliminary site design for the SP-100 ground engineering test

    International Nuclear Information System (INIS)

    Cox, C.M.; Miller, W.C.; Mahaffey, M.K.

    1986-04-01

    In November, 1985, Hanford was selected by the Department of Energy (DOE) as the preferred site for a full-scale test of the integrated nuclear subsystem for SP-100. The Hanford Engineering Development Laboratory, operated by Westinghouse Hanford Company, was assigned as the lead contractor for the Test Site. The nuclear subsystem, which includes the reactor and its primary heat transport system, will be provided by the System Developer, another contractor to be selected by DOE in late FY-1986. In addition to reactor operations, test site responsibilities include preparation of the facility plus design, procurement and installation of a vacuum chamber to house the reactor, a secondary heat transport system to dispose of the reactor heat, a facility control system, and postirradiation examination. At the conclusion of the test program, waste disposal and facility decommissioning are required. The test site must also prepare appropriate environmental and safety evaluations. This paper summarizes the preliminary design requirements, the status of design, and plans to achieve full power operation of the test reactor in September, 1990

  12. Biodiesel Test Plan

    Science.gov (United States)

    2014-07-01

    Biodiesel Test Plan Distribution Statement A: Approved for Public Release; distribution is unlimited. July 2014 Report No. CG-D-07-14...Appendix C) Biodiesel Test Plan ii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al. Public | July 2014 N O T I C E This...Development Center 1 Chelsea Street New London, CT 06320 Biodiesel Test Plan iii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al

  13. A study on the development plan and preliminary design of proton accelerator for nuclear application

    Energy Technology Data Exchange (ETDEWEB)

    Eom, Tae Yoon; Choi, B H; Park, C K; Chung, K S. and others

    1997-11-01

    A study on the development plan and preliminary design for the realisation of high current proton accelerator to be used as an essential component for the R and D of accelerator-driven system (ADS) for energy production and transmutation of long-lived radionuclides. Various fields of application of the accelerator such as basic nuclear physics, material science, biology, high energy physics, medicine, etc. were also investigated. From the preliminary design study, 1 GeV (20 mA) - Linac is required for the purposed of transmutation and energy production. Specification of injector, RFQ, CCTL and SL was also suggested. For the case study, a duoplasmatron ion source was designed by KAERI and fabricated by a domestic manufacturer, and the performance was also tested. (author). 71 refs., 61 tabs., 131 figs

  14. Test Plan Addendum No. 1: Waste Isolation Pilot Plant bin-scale CH TRU waste tests

    International Nuclear Information System (INIS)

    Molecke, M.A.; Lappin, A.R.

    1990-12-01

    This document is the first major revision to the Test Plan: WIPP Bin-Scale CH TRU Waste Tests. Factors that make this revision necessary are described and justified in Section 1, and elaborated upon in Section 4. This addendum contains recommended estimates of, and details for: (1) The total separation of waste leaching/solubility tests from bin-scale gas tests, including preliminary details and quantities of leaching tests required for testing of Levels 1, 2, and 3 WIPP CH TRU wastes; (2) An initial description and quantification of bin-scale gas test Phase 0, added to provide a crucial tie to pretest waste characterization representatives and overall test statistical validation; (3) A revision to the number of test bins required for Phases 1 and 2 of the bin gas test program, and specification of the numbers of additional bin tests required for incorporating gas testing of Level 2 wastes into test Phase 3. Contingencies are stated for the total number of test bins required, both positive and negative, including the supporting assumptions, logic, and decision points. (4) Several other general test detail updates occurring since the Test Plan was approved and published in January, 1990. Possible impacts of recommended revisions included in this Addendum on WIPP site operations are called out and described. 56 refs., 12 tabs

  15. Fabrication, inspection, and test plan for the Advanced Test Reactor (ATR) Mixed-Oxide (MOX) fuel irradiation project

    International Nuclear Information System (INIS)

    Wachs, G.W.

    1997-11-01

    The Department of Energy (DOE) Fissile Materials Disposition Materials Disposition Program (FMDP) has announced that reactor irradiation of MOX fuel is one of the preferred alternatives for disposal of surplus weapons-usable plutonium (Pu). MOX fuel has been utilized domestically in test reactors and on an experimental basis in a number of Commercial Light Water Reactors (CLWRs). Most of this experience has been with Pu derived from spent low enriched uranium (LEU) fuel, known as reactor grade (RG) Pu. The MOX fuel test will be irradiated in the ATR to provide preliminary data to demonstrate that the unique properties of surplus weapons-derived or weapons-grade (WG) plutonium (Pu) do not compromise the applicability of this MOX experience base. In addition, the test will contribute experience with irradiation of gallium-containing fuel to the data base required for resolution of generic CLWR fuel design issues (ORNL/MD/LTR-76). This Fabrication, Inspection, and Test Plan (FITP) is a level 2 document as defined in the FMDP LWR MOX Fuel Irradiation Test Project Plan (ORNL/MD/LTR-78)

  16. Inspection and test planning

    International Nuclear Information System (INIS)

    Miller, T.

    1980-01-01

    Purpose of Quality Plan - arrangement of all necessary tests or inspections as far as possible filted to certain components or systems. Subject of Quality Plan - precise determination of tests or inspections and - according to the actual safety significance - the certificates to be done. Disposition of Quality Plan - accommodation of tests to the actual state of fabrication. Application of Quality Plan - to any component or system that is regarded. Supervision of Employment - by authorized personnel of manufacturer, customer or authority providing exact employment of quality plan. Overservance of Instructions - certificates given by authorized personnel. (orig./RW)

  17. Irradiation test plan of oxidation-resistant graphite in WWR-K Research Reactor

    International Nuclear Information System (INIS)

    Sumita, Junya; Shibata, Taiju; Sakaba, Nariaki; Osaki, Hirotaka; Kato, Hideki; Fujitsuka, Kunihiro; Muto, Takenori; Gizatulin, Shamil; Shaimerdenov, Asset; Dyussambayev, Daulet; Chakrov, Petr

    2014-01-01

    Graphite materials are used for the in-core components of High Temperature Gas-cooled Reactor (HTGR) which is a graphite-moderated and helium gas-cooled reactor. In the case of air ingress accident in HTGR, SiO_2 protective layer is formed on the surface of SiC layer in TRISO CFP and oxidation of SiC does not proceed and fission products are retained inside the fuel particle. A new safety concept for the HTGR, called Naturally Safe HTGR, has been recently proposed. To enhance the safety of Naturally Safe HTGR ultimately, it is expected that oxidation-resistant graphite is used for graphite components to prevent the TRISO CFPs and fuel compacts from failure. SiC coating is one of candidate methods for oxidation-resistant graphite. JAEA and four graphite companies launched R&Ds to develop the oxidation-resistant graphite and the International Science and Technology Center (ISTC) partner project with JAEA and INP was launched to investigate the irradiation effects on the oxidation-resistant graphite. To determine grades of the oxidation-resistant graphite which will be adopted as irradiation test, a preliminary oxidation test was carried out. This paper described the results of the preliminary oxidation test, the plan of out-of-pile test, irradiation test and post-irradiation test (PIE) of the oxidation-resistant graphite. The results of the preliminary oxidation test showed that the integrity of the oxidation resistant graphite was confirmed and that all of grades used in the preliminary test can be adopted as the irradiation test. Target irradiation temperature was determined to be 1473 (K) and neutron fluence was determined to be from 0.54 × 10"2"5through 1.4 × 10"2"5 (/m"2, E>0.18MeV). Weight change, oxidation rate, activation energy, surface condition, etc. will be evaluated in out-of-pile test and weight change, irradiation effect on oxidation rate and activation energy, surface condition, etc. will be evaluated in PIE. (author)

  18. Preliminary Test for Constitutive Models of CAP

    Energy Technology Data Exchange (ETDEWEB)

    Choo, Yeon Joon; Hong, Soon Joon; Hwang, Su Hyun; Lee, Keo Hyung; Kim, Min Ki; Lee, Byung Chul [FNC Tech., Seoul (Korea, Republic of); Ha, Sang Jun; Choi, Hoon [Korea Electric Power Research Institute, Daejeon (Korea, Republic of)

    2010-05-15

    The development project for the domestic design code was launched to be used for the safety and performance analysis of pressurized light water reactors. As a part of this project, CAP (Containment Analysis Package) code has been developing for the containment safety and performance analysis side by side with SPACE. The CAP code treats three fields (vapor, continuous liquid and dispersed drop) for the assessment of containment specific phenomena, and is featured by assessment capabilities in multi-dimensional and lumped parameter thermal hydraulic cell. Thermal hydraulics solver was developed and has a significant progress now. Implementation of the well proven constitutive models and correlations are essential in other for a containment code to be used with the generalized or optimized purposes. Generally, constitutive equations are composed of interfacial and wall transport models and correlations. These equations are included in the source terms of the governing field equations. In order to develop the best model and correlation package of the CAP code, various models currently used in major containment analysis codes, such as GOTHIC, CONTAIN2.0 and CONTEMPT-LT are reviewed. Several models and correlations were incorporated for the preliminary test of CAP's performance and test results and future plans to improve the level of execution besides will be discussed in this paper

  19. Preliminary Test for Constitutive Models of CAP

    International Nuclear Information System (INIS)

    Choo, Yeon Joon; Hong, Soon Joon; Hwang, Su Hyun; Lee, Keo Hyung; Kim, Min Ki; Lee, Byung Chul; Ha, Sang Jun; Choi, Hoon

    2010-01-01

    The development project for the domestic design code was launched to be used for the safety and performance analysis of pressurized light water reactors. As a part of this project, CAP (Containment Analysis Package) code has been developing for the containment safety and performance analysis side by side with SPACE. The CAP code treats three fields (vapor, continuous liquid and dispersed drop) for the assessment of containment specific phenomena, and is featured by assessment capabilities in multi-dimensional and lumped parameter thermal hydraulic cell. Thermal hydraulics solver was developed and has a significant progress now. Implementation of the well proven constitutive models and correlations are essential in other for a containment code to be used with the generalized or optimized purposes. Generally, constitutive equations are composed of interfacial and wall transport models and correlations. These equations are included in the source terms of the governing field equations. In order to develop the best model and correlation package of the CAP code, various models currently used in major containment analysis codes, such as GOTHIC, CONTAIN2.0 and CONTEMPT-LT are reviewed. Several models and correlations were incorporated for the preliminary test of CAP's performance and test results and future plans to improve the level of execution besides will be discussed in this paper

  20. 76 FR 81462 - Preliminary Plan for Retrospective Analysis of Existing Rules

    Science.gov (United States)

    2011-12-28

    ... economic development. The Commission seeks input from the public on all aspects of its preliminary plan... technological and economic opportunities of the new millennium. As part of the Commission's goal to be a model... to achieve its statutory objectives while removing burdens on industry and promoting innovation and...

  1. NRC staff preliminary analysis of public comments on advance notice of proposed rulemaking on emergency planning

    International Nuclear Information System (INIS)

    Peabody, C.A.; Hickey, J.W.N.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking on emergency planning on July 17, 1979 (44 FR 41483). In October and November 1979, the NRC staff submitted several papers to the Commission related to the emergency planning rulemaking. One of these papers was a preliminary analysis of public comments received on the advance notice (SECY-79-591B, November 13, 1979). This document consists of the preliminary analysis as it was submitted to the Commission, with minor editorial changes

  2. Preliminary Validation and Verification Plan for CAREM Reactor Protection System; Modelo de Plan Preliminar de Validacion y Verificacion para el Sistema de Proteccion del Reactor CAREM

    Energy Technology Data Exchange (ETDEWEB)

    Fittipaldi, Ana; Felix, Maciel [Comision Nacional de Energia Atomica, Centro Atomico Bariloche (Argentina)

    2000-07-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan.

  3. Preliminary design studies on the Broad Application Test Reactor

    International Nuclear Information System (INIS)

    Terry, W.J.; Terry, W.K.; Ryskamp, J.M.; Jahshan, S.N.; Fletcher, C.D.; Moore, R.L.; Leyse, C.F.; Ottewitte, E.H.; Motloch, C.G.; Lacy, J.M.

    1992-08-01

    This report describes progress made at the Idaho National Engineering Laboratory during the first three quarters of Fiscal Year (FY) 1992 on the Laboratory-Directed Research and Development (LDRD) project to perform preliminary design studies on the Broad Application Test Reactor (BATR). This work builds on the FY-92 BATR studies, which identified anticipated mission and safety requirements for BATR and assessed a variety of reactor concepts for their potential capability to meet those requirements. The main accomplishment of the FY-92 BATR program is the development of baseline reactor configurations for the two conventional conceptual test reactors recommended in the FY-91 report. Much of the present report consists of descriptions and neutronics and thermohydraulics analyses of these baseline configurations. In addition, we considered reactor safety issues, compared the consequences of steam explosions for alternative conventional fuel types, explored a Molten Chloride Fast Reactor concept as an alternate BATR design, and examined strategies for the reduction of operating costs. Work planned for the last quarter of FY-92 is discussed, and recommendations for future work are also presented

  4. Gallium-cladding compatibility testing plan. Phases 1 and 2: Test plan for gallium corrosion tests. Revision 2

    International Nuclear Information System (INIS)

    Wilson, D.F.; Morris, R.N.

    1998-05-01

    This test plan is a Level-2 document as defined in the Fissile Materials Disposition Program Light-Water-Reactor Mixed-Oxide Fuel Irradiation Test Project Plan. The plan summarizes and updates the projected Phases 1 and 2 Gallium-Cladding compatibility corrosion testing and the following post-test examination. This work will characterize the reactions and changes, if any, in mechanical properties that occur between Zircaloy clad and gallium or gallium oxide in the temperature range 30--700 C

  5. 30 CFR 282.23 - Testing Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Testing Plan. 282.23 Section 282.23 Mineral... § 282.23 Testing Plan. All testing activities shall be conducted in accordance with a Testing Plan... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies...

  6. Cell emulation and preliminary results.

    Science.gov (United States)

    2016-07-01

    This report details preliminary results of the testing plan implemented by the Hawaii Natural Energy Institute to evaluate Electric Vehicle (EV) battery durability and reliability under electric utility grid operations. Commercial EV battery cells ar...

  7. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  8. Environmental Survey preliminary report, Nevada Test Site, Mercury, Nevada

    International Nuclear Information System (INIS)

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Nevada Test Site (NTS), conducted June 22 through July 10, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the NTS. The Survey covers all environment media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations and activities performed at the NTS, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by the Battelle Columbus Division under contract with DOE. When completed, the results will be incorporated into the NTS Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the NTS Survey. 165 refs., 42 figs., 52 tabs

  9. Hydrogen Gas Retention and Release from WTP Vessels: Summary of Preliminary Studies

    Energy Technology Data Exchange (ETDEWEB)

    Gauglitz, Phillip A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bontha, Jagannadha R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Daniel, Richard C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mahoney, Lenna A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rassat, Scot D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wells, Beric E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bao, Jie [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Boeringa, Gregory K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Buchmiller, William C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Burns, Carolyn A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chun, Jaehun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Karri, Naveen K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Huidong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tran, Diana N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-07-01

    The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release from Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design

  10. Test plans for availability

    International Nuclear Information System (INIS)

    Rise, J.L.; Bjoerklund, O.

    1978-12-01

    In this work is developed principles for statistical test plans for availability compliance tests. Failure terminated and time terminated fixed size plans are considered as well as sequential test plans without and with failure and time truncation. The suggested methods are evaluated with respect to some important characteristics, namely the average number of failures to termination, the duration of the test and the operating characteristic function. The methods used are based on the assumption that up- and down-times can be considered gamma distributed. Simulation studies indicate that the methods are robust against reasonable deviations in distribution assumptions for the down-times. In the work is also outlined technical conditions and prerequisites applicable to availability compliance tests in general. The approach choosen seems very promising and is worth further development. It is based on the same fundamental principles as present is used in International standardization of equipment reliability testing. (author)

  11. Preliminary plan for decommissioning - repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    Hallberg, Bengt; Tiberg, Liselotte

    2010-06-01

    The final disposal facility for spent nuclear fuel is part of the KBS-3 system, which also consists of a central facility for interim storage and encapsulation of the spent nuclear fuel and a transport system. The nuclear fuel repository will be a nuclear facility. Regulation SSMFS 2008:1 (Swedish Radiation Safety Authority's regulations on safety of nuclear facilities) requires that the licensee must have a current decommissioning plan throughout the facility lifecycle. Before the facility is constructed, a preliminary decommissioning plan should be reported to the Swedish Radiation Safety Authority. This document is a preliminary decommissioning plan, and submitted as an attachment to SKB's application for a license under the Nuclear Activities Act to construct, own and operate the facility. The final disposal facility for spent nuclear fuel consists of an above ground part and a below ground part and will be built near Forsmark and the final repository for radioactive operational waste, SFR. The parts above and below ground are connected by a ramp and several shafts, e.g. for ventilation. The below ground part consists of a central area, and several landfill sites. The latter form the repository area. The sealed below ground part constitutes the final repository. The decommissioning is taking place after the main operation has ended, that is, when all spent nuclear fuel has been deposited and the deposition tunnels have been backfilled and plugged. The decommissioning involves sealing of the remaining parts of the below ground part and demolition of above ground part. When decommissioning begins, there will be no contamination in the facility. The demolition is therefore performed as for a conventional plant. Demolition waste is sorted and recycled whenever possible or placed in landfill. Hazardous waste is managed in accordance with current regulations. A ground investigation is performed and is the basis for after-treatment of the site. The timetable for the

  12. Digface characterization test plan (remote testing)

    International Nuclear Information System (INIS)

    Croft, K.; Hyde, R.; Allen, S.

    1993-08-01

    The objective of the Digface Characterization (DFC) Remote Testing project is to remotely deploy a sensor head (Mini-Lab) across a digface to determine if it can characterize the contents below the surface. The purpose of this project is to provide a robotics technology that allows removal of workers from hazards, increases speed of operations, and reduces life cycle costs compared to alternate methods and technologies. The Buried Waste Integrated Demonstration (BWID) is funding the demonstration, testing, and evaluation of DFC. This document describes the test plan for the DFC remote deployment demonstration for the BWID. The purposes of the test plan are to establish test parameters so that the demonstration results are deemed useful and usable and perform the demonstration in a safe manner and within all regulatory requirements

  13. 78 FR 48159 - Preliminary 2012 Effluent Guidelines Program Plan and 2011 Annual Effluent Guidelines Review Report

    Science.gov (United States)

    2013-08-07

    ... publish a preliminary plan in the odd numbered years and a final plan in the even numbered years. The... necessary before concluding the review of the three remaining point source categories: Pulp, Paper and... standards for the 2012 reviews. These methodologies included: Identifying pass-through pollutants in sewage...

  14. Corporate Data Network (CDN). Data Requirements Task. Preliminary Strategic Data Plan. Volume 4

    International Nuclear Information System (INIS)

    1985-11-01

    The NRC has initiated a multi-year program to centralize its information processing in a Corporate Data Network (CDN). The new information processing environment will include shared databases, telecommunications, office automation tools, and state-of-the-art software. Touche Ross and Company was contracted with to perform a general data requirements analysis for shared databases and to develop a preliminary plan for implementation of the CDN concept. The Enterprise Model (Vol. 1) provided the NRC with agency-wide information requirements in the form of data entities and organizational demand patterns as the basis for clustering the entities into logical groups. The Data Dictionary (Vol.2) provided the NRC with definitions and example attributes and properties for each entity. The Data Model (Vol.3) defined logical databases and entity relationships within and between databases. The Preliminary Strategic Data Plan (Vol. 4) prioritized the development of databases and included a workplan and approach for implementation of the shared database component of the Corporate Data Network

  15. Site study plan for Deep Hydronest Test Wells, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-05-01

    Wells called Deep Hydronest Wells will be installed at six locations at the Deaf Smith County Site to characterize hydraulic parameters in the geologic column between the top of the San Andres Formation and the base of Pennsylvanian System. Three hydronests will be drilled during early stages of site characterization to provide data for performance assessment modeling. Four wells are proposed for each of these 3 nests. Results of drilling, testing, and preliminary modeling will direct drilling and testing activities at the last 3 nests. Two wells are proposed at each of the last 3 nests for a total of 18 wells. The Salt Repository Project (SRP) Networks specify the schedule under which this program will operate. Drilling and hydrologic testing of the first Deep Hydronest will begin early in the Surface Investigation Program. Drilling and testing of the first three Deep Hydronests will require about 18 months. After 12 months of evaluating and analyzing data from the first three hydronests, the remaining three hydronests will be drilled during a 12-month period. The Technical Field Services Contractor is responsible for conducting the field program. Samples and data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be used to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 36 refs., 20 figs., 6 tabs

  16. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  17. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  18. Environmental Survey preliminary report, Nevada Test Site, Mercury, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Nevada Test Site (NTS), conducted June 22 through July 10, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the NTS. The Survey covers all environment media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations and activities performed at the NTS, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by the Battelle Columbus Division under contract with DOE. When completed, the results will be incorporated into the NTS Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the NTS Survey. 165 refs., 42 figs., 52 tabs.

  19. Business plan: A preliminary approach to an unknown genre

    Directory of Open Access Journals (Sweden)

    Federico Navarro

    2015-11-01

    Full Text Available The business plan has been widely included in the curricula of economics degrees and is key to business practice worldwide, but has not been studied from a socio-discursive perspective yet due to restrictions in its social, spatial, and temporal circulation. Based on interviews and a qualitative analysis of a corpus of 38 texts written in Spanish, I aim to provide a preliminary description of the genre. Results indicate that a chain of four phases is associated to a continuum of social settings organized through entrepreneurial/corporate and expert/training variables; its rhetorical structure includes “describing present/potential situation of the company and market” and “describing future processes of strategic actions regarding the marketing, production, and financial plans”. This analysis offers methodological innovations to account for occluded genres, encourages the contrastive study of the business plan in different cultural and linguistic environments, and assists business teachers with a situated picture of the genre

  20. STUDENT PLANNING TIME IN ORAL TESTS

    Institute of Scientific and Technical Information of China (English)

    WangLei

    2004-01-01

    This paper describes the process of planning in an oral test situation. Since many researchers have studied the impact of pretask planning in the Second Language Acquisition (SLA) field and some have explored the same subject into the area of oral tests, the present study tries to make a tentative attempt to see what the test takers are actually doing in the planning time while taking an oral test. A questionnaire was designed with the effort to find out whether planning time results in an increased focus on form, particularly at the level of strategic attention to form.The result of the investigation tells us that restricted by the type of situation, test takers can only plan the framework of what they are going to say, which may differ to the results achieved by previous studies.

  1. A Preliminary Version of Heavy Ion Treatment Planning System at IMP

    International Nuclear Information System (INIS)

    Liu Xinguo; Dai Zhongying; Ye Fei; Wu Qingfeng; Li Ping; Li Qiang; Jin Xiaodong; Du Xiaogang; WangYangping; Dang Jianwu

    2010-01-01

    Based on the Heavy Ion Research Facility in Lanzhou (HIRFL/HIRFL-CSR), clinical trials of heavy ion radiotherapy are being conducted at the Institute of Modern Physics (IMP), Chinese Academy of Sciences, where two-dimensional(2D) layer-stacking conformal irradiation method in a passive beam delivery system was applied. To make better use of the biophysical advantages of heavy ion beams and ensure success of the clinical trials, a preliminary version of heavy ion treatment planning system (TPS) has been developed at IMP. The TPS was designed in a manner to adapt to the 2D layer-stacking conformal irradiation method. The architecture and function of the TPS software and the implementation of dose calculation algorithm in the TPS were introduced in this paper.The deviation between the doses planned by the TPS and measured through an anthropomorphous phantom was verified to be less than 5%. Finally,the pending issues for developing a sophisticated treatment planning system at IMP were discussed. (authors)

  2. Test plan for Tank 241-AW-101 solubility screening tests

    International Nuclear Information System (INIS)

    Person, J.C.

    1998-01-01

    Tank 241-AW-101 (101-AW) has been identified as one of the early tanks to be for retrieved for low level waste pretreatment and immobilization and retrieval of the tank waste may require dilution. This test is to determine the effects of dilution on the mass of solids and their composition. This test plan gives test instructions, example data sheets, a waste compatibility review, and a waste stream fact sheet. This test Plan is similar to tests on tanks 241-AN-102 (Person 1998a) and 241-AN-107 (Person 1998 b). The 101-AW tests will be done with composites of liquid and solids from grab samples that were taken in 1998 (Benar 1998). Future revisions of the Tank Sampling and Analysis Plan (Benar 1998) may change the details of the work performed under this test plan

  3. Preliminary inspection of secondary cooling system piping for maintenance plan in JMTR

    International Nuclear Information System (INIS)

    Hanakawa, Hiroki; Hanawa, Yoshio; Izumo, Hironobu; Fukasaku, Akitomi; Nagao, Yoshiharu; Miyazawa, Masataka; Niimi, Motoji

    2008-01-01

    The JMTR is under the refurbishment and will start on FY 2011. The JMTR will operate for about 20 years from 2011. Before this JMTR operation, preliminary inspection of secondary cooling system piping was carried out in order to make a maintenance plan. As the results of this inspection, it was confirmed that the corrosion was reached by piping ingot, or decrease of piping thickness could hardly be observed. Therefore, it was confirmed that the strength or the functionality of the piping had been maintained by usual operation and maintenance. According to the results of this inspection, the basic date for maintenances are confirmed and it is clear to be able to make the maintenances plan in future. (author)

  4. The preliminary planning for decommissioning nuclear facilities in Taiwan

    International Nuclear Information System (INIS)

    Li, K.K.

    1993-01-01

    During the congressional hearing in 1992 for a $7 billion project for approval of the fourth nuclear power plant, the public was concerned about the decommissioning of the operating plants. In order to facilitate the public acceptance of nuclear energy and to secure the local capability for appropriate nuclear backend management, both technologically and financially, it is important to have preliminary planning for decommissioning the nuclear facilities. This paper attempted to investigate the possible scope of decommissioning activities and addressed the important regulatory, financial, and technological aspects. More research and development works regarding the issue of decommissioning are needed to carry out the government's will of decent management of nuclear energy from the cradle to the grave

  5. Formulating a preliminary business plan for a business consultancy company : case: CreaNets Business Development and Consultancy

    OpenAIRE

    Korkmaz, Gökhan

    2015-01-01

    The main purpose of this research is to formulate a preliminary business plan for a business consultancy which will operate between Finland and Turkey and be headquartered in Finland. The research focuses on practical information on entrepreneurship, business planning and business models as well as starting up a new business in Finland. During the theoretical framework, information is provided on entrepreneurship and business planning. Hoffren’s Dynamic Business Model and Osterwalder’s Bu...

  6. Seismic proving test of ultimate piping strength (current status of preliminary tests)

    International Nuclear Information System (INIS)

    Suzuki, K.; Namita, Y.; Abe, H.; Ichihashi, I.; Suzuki, K.; Ishiwata, M.; Fujiwaka, T.; Yokota, H.

    2001-01-01

    In 1998 Fiscal Year, the 6 year program of piping tests was initiated with the following objectives: i) to clarify the elasto-plastic response and ultimate strength of nuclear piping, ii) to ascertain the seismic safety margin of the current seismic design code for piping, and iii) to assess new allowable stress rules. In order to resolve extensive technical issues before proceeding on to the seismic proving test of a large-scale piping system, a series of preliminary tests of materials, piping components and simplified piping systems is intended. In this paper, the current status of the material tests and the piping component tests is reported. (author)

  7. Test results with the Transrapid 06. System data from preliminary trials

    Energy Technology Data Exchange (ETDEWEB)

    Heinrich, K; Mnich, P

    1987-10-01

    Following the takeover of the Transrapid maglev facility by MVP, in spite of remaining preparatory work and conversion of the support and guidance system on the basis of a new electronic generation, interesting system data could be obtained experimentally before the planned continuous trials phase. Although the full test track length is not yet available - it is at present only 20.5 km - more than 25,000 km have already been covered in almost 1,200 test runs. Some 200 of these were for the purpose of demonstrating the Transrapid technology to visting German and foreign experts. The system data obtained from the preliminary trails were positive. Any weak points noted were mainly site-specific and not maglev-specific, but in spite of generally satisfactory results there are still many individual aspects calling for improvement and optimation before the technology can be declared ready for service. Proceeding from the positive trend of the system data obtained at up to 355 km/h, it can be said that proof of serviceability of the Transrapid transport system at speeds of up to 400 km/h can be provided in the next two years. (orig.).

  8. The Preliminary Decommissioning Plan of the Dalat Nuclear Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lam, Pham Van; Vien, Luong Ba; Vinh, Le Vinh; Nghiem, Huynh Ton; Tuan, Nguyen Minh; Phuong, Pham Hoai [Nuclear Research Institute, Da Lat (Viet Nam)

    2013-08-15

    Recently, after 25 years of operation, a preliminary decommissioning plan for the Dalat Nuclear Research Reactor (DNRR) has been produced but as yet it has not been implemented due to the continued operations of the reactor. However, from the early phases of facility design and construction and during operation, the aspects that facilitate decommissioning process have been considered. This paper outlines the DNRR general description, the organization that manages the facility, the decommissioning strategy and associated project management, and the expected decommissioning activities. The paper also considers associated cost and funding, safety and environmental issues and waste management aspects amongst other considerations associated with decommissioning a nuclear research reactor. (author)

  9. Waste feed delivery test and evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    O' TOOLE, S.M.

    1999-09-30

    This plan documents the Waste Feed Delivery Program test and evaluation planning and implementation approach. The purpose of this document is to define and communicate the Waste Feed Delivery Program Test and Evaluation scope, objectives, planning and implementation approach.

  10. Waste feed delivery test and evaluation plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan documents the Waste Feed Delivery Program test and evaluation planning and implementation approach. The purpose of this document is to define and communicate the Waste Feed Delivery Program Test and Evaluation scope, objectives, planning and implementation approach

  11. Development of a preliminary decommissioning plan of the reactor IPEN/MB-01

    International Nuclear Information System (INIS)

    Vivas, Ary de Souza; Carneiro, Alvaro Luiz Guimaraes

    2013-01-01

    Around the world, many nuclear plants were built and need to be turned off at a certain time because they are close to their recommended time of use is approximately 50 years. So the IAEA (International Atomic Energy Agency), seeks to guide and recommend, through publications, guidelines for the conduct of activities both for decommissioning nuclear power plants and for research reactors, with special attention to countries that do not have a framework regulatory Legal that sustain the activities of decommissioning. Brazil, so far, does not have a specific standard to guide the steps of the guidelines regarding decommissioning research reactors, having only a standard applied to decommissioning power plants which was published in November 2012. The Nuclear and Energy Research Institute (IPEN) has two research reactors one being the reactor IPEN/MB-01. The aim of this work is to develop a preliminary plan for decommissioning of nuclear reactor research, considering the technical documentation of the system (RAS-Safety Analysis Report), the existing rules of CNEN (National Nuclear Energy Commission), as well as regulatory instructions and recommendations of the IAEA. The preliminary decommissioning plan consists of the presentation of actions and steps required as well as the strategies to be adopted for the shutdown of the facility under the technical and administrative, seeking the safety, health workers and the general public, minimizing environmental impacts. (author)

  12. Preliminary Tests of a New Low-Cost Photogrammetric System

    Science.gov (United States)

    Santise, M.; Thoeni, K.; Roncella, R.; Sloan, S. W.; Giacomini, A.

    2017-11-01

    This paper presents preliminary tests of a new low-cost photogrammetric system for 4D modelling of large scale areas for civil engineering applications. The system consists of five stand-alone units. Each of the units is composed of a Raspberry Pi 2 Model B (RPi2B) single board computer connected to a PiCamera Module V2 (8 MP) and is powered by a 10 W solar panel. The acquisition of the images is performed automatically using Python scripts and the OpenCV library. Images are recorded at different times during the day and automatically uploaded onto a FTP server from where they can be accessed for processing. Preliminary tests and outcomes of the system are discussed in detail. The focus is on the performance assessment of the low-cost sensor and the quality evaluation of the digital surface models generated by the low-cost photogrammetric systems in the field under real test conditions. Two different test cases were set up in order to calibrate the low-cost photogrammetric system and to assess its performance. First comparisons with a TLS model show a good agreement.

  13. PRELIMINARY TESTS OF A NEW LOW-COST PHOTOGRAMMETRIC SYSTEM

    Directory of Open Access Journals (Sweden)

    M. Santise

    2017-11-01

    Full Text Available This paper presents preliminary tests of a new low-cost photogrammetric system for 4D modelling of large scale areas for civil engineering applications. The system consists of five stand-alone units. Each of the units is composed of a Raspberry Pi 2 Model B (RPi2B single board computer connected to a PiCamera Module V2 (8 MP and is powered by a 10 W solar panel. The acquisition of the images is performed automatically using Python scripts and the OpenCV library. Images are recorded at different times during the day and automatically uploaded onto a FTP server from where they can be accessed for processing. Preliminary tests and outcomes of the system are discussed in detail. The focus is on the performance assessment of the low-cost sensor and the quality evaluation of the digital surface models generated by the low-cost photogrammetric systems in the field under real test conditions. Two different test cases were set up in order to calibrate the low-cost photogrammetric system and to assess its performance. First comparisons with a TLS model show a good agreement.

  14. Test planning and performance

    International Nuclear Information System (INIS)

    Zola, Maurizio

    2001-01-01

    Testing plan should include Safety guide Q4 - Inspection and testing - A testing plan should be prepared including following information: General information (facility name, item or system reference, procurement document reference, document reference number and status, associated procedures and drawings); A sequential listing of all testing activities; Procedure, work instruction, specification or standard to be followed in respect of each operation and test; Acceptance criteria; Identification of who is performing tests; Identification of hold points; Type of records to be prepared for each test; Persons and organizations having authority for final acceptance. Proposed activities sequence is: visual, electrical and mechanical checks; environmental tests (thermal aging, vibrations aging, radioactive aging); performance evaluation in extreme conditions; dynamic tests with functional checks; final electrical and mechanical checks The planning of the tests should always be performed taking into account an interpretative model: a very tight cooperation is advisable between experimental people and numerical people dealing with the analysis of more or less complex models for the seismic assessment of structures and components. Preparatory phase should include the choice of the following items should be agreed upon with the final user of the tests: Excitation points, Excitation types, Excitation amplitude with respect to frequency, Measuring points. Data acquisition, recording and storage, should take into account the characteristics of the successive data processing: to much data can be cumbersome to be processed, but to few data can make unusable the experimental results. The parameters for time history acquisition should be chosen taking into account data processing: for Shock Response Spectrum calculation some special requirements should be met: frequency bounded signal, high frequency sampling, shock noise. For stationary random-like excitation, the sample length

  15. Preliminary results of testing bioassay analytical performance standards

    International Nuclear Information System (INIS)

    Fisher, D.R.; Robinson, A.V.; Hadley, R.T.

    1983-08-01

    The analytical performance of both in vivo and in vitro bioassay laboratories is being studied to determine the capability of these laboratories to meet the minimum criteria for accuracy and precision specified in the draft ANSI Standard N13.30, Performance Criteria for Radiobioassay. This paper presents preliminary results of the first round of testing

  16. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  17. Test Plan: Phase 1, Hanford LLW melter tests, GTS Duratek, Inc

    International Nuclear Information System (INIS)

    Eaton, W.C.

    1995-01-01

    This document provides a test plan for the conduct of vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384215] is GTS Duratek, Inc., Columbia, Maryland. The GTS Duratek project manager for this work is J. Ruller. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes melting of glass with Hanford LLW Double-Shell Slurry Feed waste simulant in a DuraMelter trademark vitrification system

  18. Preliminary plan for decommissioning - repository for spent nuclear fuel; Preliminaer plan foer avveckling - slutfoervar foer anvaent kaernbraensle

    Energy Technology Data Exchange (ETDEWEB)

    Hallberg, Bengt; Tiberg, Liselotte (Studsvik Nuclear AB, Nykoeping (Sweden))

    2010-06-15

    The final disposal facility for spent nuclear fuel is part of the KBS-3 system, which also consists of a central facility for interim storage and encapsulation of the spent nuclear fuel and a transport system. The nuclear fuel repository will be a nuclear facility. Regulation SSMFS 2008:1 (Swedish Radiation Safety Authority's regulations on safety of nuclear facilities) requires that the licensee must have a current decommissioning plan throughout the facility lifecycle. Before the facility is constructed, a preliminary decommissioning plan should be reported to the Swedish Radiation Safety Authority. This document is a preliminary decommissioning plan, and submitted as an attachment to SKB's application for a license under the Nuclear Activities Act to construct, own and operate the facility. The final disposal facility for spent nuclear fuel consists of an above ground part and a below ground part and will be built near Forsmark and the final repository for radioactive operational waste, SFR. The parts above and below ground are connected by a ramp and several shafts, e.g. for ventilation. The below ground part consists of a central area, and several landfill sites. The latter form the repository area. The sealed below ground part constitutes the final repository. The decommissioning is taking place after the main operation has ended, that is, when all spent nuclear fuel has been deposited and the deposition tunnels have been backfilled and plugged. The decommissioning involves sealing of the remaining parts of the below ground part and demolition of above ground part. When decommissioning begins, there will be no contamination in the facility. The demolition is therefore performed as for a conventional plant. Demolition waste is sorted and recycled whenever possible or placed in landfill. Hazardous waste is managed in accordance with current regulations. A ground investigation is performed and is the basis for after-treatment of the site. The timetable

  19. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  20. Conceptual Design for a High-Temperature Gas Loop Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    James B. Kesseli

    2006-08-01

    This report documents an early-stage conceptual design for a high-temperature gas test loop. The objectives accomplished by the study include, (1) investigation of existing gas test loops to determine ther capabilities and how the proposed system might best complement them, (2) development of a preliminary test plan to help identify the performance characteristics required of the test unit, (3) development of test loop requirements, (4) development of a conceptual design including process flow sheet, mechanical layout, and equipment specifications and costs, and (5) development of a preliminary test loop safety plan.

  1. Preliminary decommissioning plan of the reactor IPEN-MB01

    International Nuclear Information System (INIS)

    Vivas, Ary de Souza

    2014-01-01

    Around the world, many nuclear plants were built and need to be turned off at a certain time because they are close to their recommended time of use is approximately 50 years. So the IAEA (International Atomic Energy Agency), seeks to guide and recommend a set of guidelines for the conduct of activities of nuclear facilities, with special attention to countries that do not have a framework regulatory Legal that sustain the activities of decommissioning. Brazil, so far, does not have a specific standard to guide the steps of the guidelines regarding decommissioning research reactors. However, in March 2011 a study committee was formed with the main task facing the issues of decommissioning of nuclear installations in Brazil, culminating in Resolution 133 of November 8, 2012, a standard project that treat about the Decommissioning of nucleoelectric plants. O Instituto de Pesquisas Energeticas e Nucleares (IPEN) has two research reactors one being the reactor IPEN/MB-01. The purpose of this master dissertation is to develop a preliminary plan for decommissioning this research reactor, considering the technical documentation of the facility (RAS-Safety Analysis Report), the existing standards of CNEN (National Nuclear Energy Commission), as well as IAEA recommendations. In terms of procedures for decommissioning research reactors, this work was based on what is most modern in experiences, strategies and lessons learned performed and documented in IAEA publications covering techniques and technologies for decommissioning. Considering these technical knowledge and due to the peculiarities of the facility, was selected to immediate dismantling strategy, which corresponds to the start of decommissioning activities once the installation is switched off, dividing it into work sectors. As a resource for monitoring and project management of reactor decommissioning and maintenance of records, we developed a database using Microsoft Access 2007, which contain all the items and

  2. Test Plan: Sludge Treatment Project Corrosion Process Chemistry Follow-on Testing

    Energy Technology Data Exchange (ETDEWEB)

    Delegard, Calvin H.; Schmidt, Andrew J.; Poloski, Adam P.

    2007-08-17

    This test plan was prepared by the Pacific Northwest National Laboratory (PNNL) under contract with Fluor Hanford (FH). The test plan describes the scope and conditions to be used to perform laboratory-scale testing of the Sludge Treatment Project (STP) hydrothermal treatment of K Basin sludge. The STP, managed for the U. S. Department of Energy (DOE) by FH, was created to design and operate a process to eliminate uranium metal from the sludge prior to packaging for Waste Isolation Pilot Plant (WIPP) by using high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. The proposed testing builds on the approach and laboratory test findings for both K Basin sludge and simulated sludge garnered during prior testing from September 2006 to March 2007. The outlined testing in this plan is designed to yield further understanding of the nature of the chemical reactions, the effects of compositional and process variations and the effectiveness of various strategies to mitigate the observed high shear strength phenomenon observed during the prior testing. These tests are designed to provide process validation and refinement vs. process development and design input. The expected outcome is to establish a level of understanding of the chemistry such that successful operating strategies and parameters can be implemented within the confines of the existing STP corrosion vessel design. In July 2007, the DOE provided direction to FH regarding significant changes to the scope of the overall STP. As a result of the changes, FH directed PNNL to stop work on most of the planned activities covered in this test plan. Therefore, it is unlikely the testing described here will be performed. However, to preserve the test strategy and details developed to date, the test plan has been published.

  3. Preliminary experience with SpineEOS, a new software for 3D planning in AIS surgery.

    Science.gov (United States)

    Ferrero, Emmanuelle; Mazda, Keyvan; Simon, Anne-Laure; Ilharreborde, Brice

    2018-04-24

    Preoperative planning of scoliosis surgery is essential in the effective treatment of spine pathology. Thus, precontoured rods have been recently developed to avoid iatrogenic sagittal misalignment and rod breakage. Some specific issues exist in adolescent idiopathic scoliosis (AIS), such as a less distal lower instrumented level, a great variability in the location of inflection point (transition from lumbar lordosis to thoracic kyphosis), and sagittal correction is limited by both bone-implant interface. Since 2007, stereoradiographic imaging system is used and allows for 3D reconstructions. Therefore, a software was developed to perform preoperative 3D surgical planning and to provide rod's shape and length. The goal of this preliminary study was to assess the feasibility, reliability, and the clinical relevance of this new software. Retrospective study on 47 AIS patients operated with the same surgical technique: posteromedial translation through posterior approach with lumbar screws and thoracic sublaminar bands. Pre- and postoperatively, 3D reconstructions were performed on stereoradiographic images (EOS system, Paris, France) and compared. Then, the software was used to plan the surgical correction and determine rod's shape and length. Simulated spine and rods were compared to postoperative real 3D reconstructions. 3D reconstructions and planning were performed by an independent observer. 3D simulations were performed on the 47 patients. No difference was found between the simulated model and the postoperative 3D reconstructions in terms of sagittal parameters. Postoperatively, 21% of LL were not within reference values. Postoperative SVA was 20 mm anterior in 2/3 of the cases. Postoperative rods were significantly longer than precontoured rods planned with the software (mean 10 mm). Inflection points were different on the rods used and the planned rods (2.3 levels on average). In this preliminary study, the software based on 3D stereoradiography low

  4. AFFTC Instruction 99-1, Test and Evaluation Test Plans

    National Research Council Canada - National Science Library

    Crane, Roger

    2002-01-01

    .... Test Information Sheets (TISs) are actually appendices to test plans and contain sufficient information for use by a flight test engineer to develop flight test cards and for management to discern the overall technical approach being taken...

  5. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  6. Preliminary business plan: Plzen district heating system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The district heating system of the City of Plzen, Czech Republic, needs to have physical upgrades to replace aging equipment and to comply with upcoming environmental regulations. Also, its ownership and management are being changed as a result of privatization. As majority owner, the City has the primary goal of ensuring that the heating needs of its customers are met as reliably and cost-effectively as possible. This preliminary business plan is part of the detailed analysis (5 reports in all) done to assist the City in deciding the issues. Preparation included investigation of ownership, management, and technology alternatives; estimation of market value of assets and investment requirements; and forecasting of future cash flow. The district heating system consists of the Central Plzen cogeneration plant, two interconnected heating plants [one supplying both hot water and steam], three satellite heating plants, and cooperative agreements with three industrial facilities generating steam and hot water. Most of the plants are coal-fired, with some peaking units fired by fuel oil.

  7. Preliminary design of steam reformer in out-pile demonstration test facility for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Haga, Katsuhiro; Hino, Ryutaro; Inagaki, Yosiyuki; Hata, Kazuhiko; Aita, Hideki; Sekita, Kenji; Nishihara, Tetsuo; Sudo, Yukio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Yamada, Seiya

    1996-11-01

    One of the key objectives of HTTR is to demonstrate effectiveness of high-temperature nuclear heat utilization system. Prior to connecting a heat utilization system to HTTR, an out-pile demonstration test is indispensable for the development of experimental apparatuses, operational control and safety technology, and verification of the analysis code of safety assessment. For the first heat utilization system of HTTR, design of the hydrogen production system by steam reforming is going on. We have proposed the out-pile demonstration test plan of the heat utilization system and conducted preliminary design of the test facility. In this report, design of the steam reformer, which is the principal component of the test facility, is described. In the course of the design, two types of reformers are considered. The one reformer contains three reactor tubes and the other contains one reactor tube to reduce the construction cost of the test facility. We have selected the steam reformer operational conditions and structural specifications by analyzing the steam reforming characteristics and component structural strength for each type of reformer. (author)

  8. Acceptance Test Plan for ANSYS Software

    International Nuclear Information System (INIS)

    CREA, B.A.

    2000-01-01

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled

  9. Addendum to ''Test Plan: Small-Scale Seal Performance Tests (SSSPT)''

    International Nuclear Information System (INIS)

    Finley, R.E.

    1992-01-01

    This document describes activities that are intended to update the data base of fluid flow measurements made on expansive salt concrete (ESC) seals as part of the Small-Scale Seal Performance Tests (SSSPT). The original plans for the SSSPT experiments are described by Stormont (1985a and 1985b). These seals have previously been tested with brine and gas during the early stages (less than 450 days) after emplacement. The purpose of this Test Plan Addendum is to detail the activities necessary to, update the gas and brine measurements previously performed on the SSSPT Series A and Series B seals and to identify the key personnel responsible for implementing these activities. This addendum describes a limited undertaking and does NOT change the scope of the original test plan

  10. Test plan for long-term, low-temperature oxidation of spent fuel, Series 1

    International Nuclear Information System (INIS)

    Einziger, R.E.

    1986-06-01

    Preliminary studies indicated the need for more spent fuel oxidation data in order to determine the probable behavior of spent fuel in a tuff repository. Long-term, low-temperature testing was recommended in a comprehensive technical approach to: (1) confirm the findings of the short-term thermogravimetric analyses scoping experiments; (2) evaluate the effects of variables such as burnup, atmospheric moisture and fuel type on the oxidation rate; and (3) extend the oxidation data base ot representative repository temperatures and better define the temperature dependence of the operative oxidation mechanisms. This document presents the Series 1 test plan to study, on a large number of samples, the effects of atmospheric moisture and temperature on oxidation rate and phase formation. Tests will run for up to two years, use characterized fragmented, and pulverized fuel samples, cover a temperature range of 110 0 C to 175 0 C and be conducted with an atmospheric moisture content rangeing from 0 C to approx. 80 0 C dew point. After testing, the samples will be examined and made available for leaching testing

  11. IFE chamber technology testing program in NIF and chamber development test plan

    International Nuclear Information System (INIS)

    Abdou, M.A.

    1995-01-01

    Issues concerning chamber technology testing program in NIF involving: criteria for evaluation/prioritization of experiments, engineering scaling requirements for test article design and material selection and R and D plan prior to NIF testing were addressed in this paper. In order to maximize the benefits of testing program in NIF, the testing in NIF should provide the experimental data relevant to DEMO design choice or to DEMO design predictive capability by utilizing engineering scaling test article designs. Test plans were developed for 2 promising chamber design concepts. Early testing in non-fusion/non-ignition prior to testing in ignition facility serves a critical role in chamber R and D test plans in order to reduce the risks and costs of the more complex experiments in NIF

  12. Preliminary assessments the shortcut to remediation (category III-surplus facility assessments)

    International Nuclear Information System (INIS)

    Byars, L.L.

    1995-01-01

    This report presents the details of the preliminary assessments for the shortcut of decontamination of surplus nuclear facilities. Topics discussed include: environment, health and safety concerns; economic considerations; reduction of transition time; preliminary characterization reports; preliminary project plan; health and safety plan; quality assurance plan; surveillance and maintenance plan; and waste management plan

  13. Test plan for FY-91 dust control studies

    International Nuclear Information System (INIS)

    Winberg, M.R.

    1991-03-01

    This test plan defines basic test procedures for testing commercially available vendor products as soil fixatives and dust suppression agents to determine their capability to control fugitive dust generation during transuranic waste retrieval and handling operations. A description of the test apparatus and methods are provided in this test plan. This test plan defines the sampling procedures, controls, and analytical methods for the samples collected. Data management is discussed, as well as quality assurance and safety requirements for the study. 6 refs., 5 figs

  14. Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361

    International Nuclear Information System (INIS)

    Moshonas Cole, Katherine; Dinner, Julia; Grey, Mike; Daniska, Vladimir

    2013-01-01

    The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

  15. Preliminary Analysis of the Transient Reactor Test Facility (TREAT) with PROTEUS

    Energy Technology Data Exchange (ETDEWEB)

    Connaway, H. M. [Argonne National Lab. (ANL), Argonne, IL (United States); Lee, C. H. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2015-11-30

    The neutron transport code PROTEUS has been used to perform preliminary simulations of the Transient Reactor Test Facility (TREAT). TREAT is an experimental reactor designed for the testing of nuclear fuels and other materials under transient conditions. It operated from 1959 to 1994, when it was placed on non-operational standby. The restart of TREAT to support the U.S. Department of Energy’s resumption of transient testing is currently underway. Both single assembly and assembly-homogenized full core models have been evaluated. Simulations were performed using a historic set of WIMS-ANL-generated cross-sections as well as a new set of Serpent-generated cross-sections. To support this work, further analyses were also performed using additional codes in order to investigate particular aspects of TREAT modeling. DIF3D and the Monte-Carlo codes MCNP and Serpent were utilized in these studies. MCNP and Serpent were used to evaluate the effect of geometry homogenization on the simulation results and to support code-to-code comparisons. New meshes for the PROTEUS simulations were created using the CUBIT toolkit, with additional meshes generated via conversion of selected DIF3D models to support code-to-code verifications. All current analyses have focused on code-to-code verifications, with additional verification and validation studies planned. The analysis of TREAT with PROTEUS-SN is an ongoing project. This report documents the studies that have been performed thus far, and highlights key challenges to address in future work.

  16. Preliminary test conditions for KNGR SBLOCA DVI ECCS performance test

    International Nuclear Information System (INIS)

    Bae, Kyoo Whan; Song, Jin Ho; Chung, Young Jong; Sim, Suk Ku; Park, Jong Kyun

    1999-03-01

    The Korean Next Generation Reactor (KNGR) adopts 4-train Direct Vessel Injection (DVI) configuration and injects the safety injection water directly into the downcomer through the 8.5'' DVI nozzle. Thus, the thermal hydraulic phenomena such as ECCS mixing and bypass are expected to be different from those observed in the cold leg injection. In order to investigate the realistic injection phenomena and modify the analysis code developed in the basis of cold leg injection, thermal hydraulic test with the performance evaluation is required. Preliminarily, the sequence of events and major thermal hydraulic phenomena during the small break LOCA for KNGR are identified from the analysis results calculated by the CEFLASH-4AS/REM. It is shown from the analysis results that the major transient behaviors including the core mixture level are largely affected by the downcomer modeling. Therefore, to investigate the proper thermal hydraulic phenomena occurring in the downcomer with limited budget and time, the separate effects test focusing on this region is considered to be effective and the conceptual test facility based on this recommended. For this test facility the test initial and boundary conditions are developed using the CEFLASH-4AS/REM analysis results that will be used as input for the preliminary test requirements. The final test requirements will be developed through the further discussions with the test performance group. (Author). 10 refs., 18 tabs., 4 figs

  17. Poster - 56: Preliminary comparison of FF- and FFF-VMAT for prostate plans with higher rectal dose

    International Nuclear Information System (INIS)

    Liu, Baochang; Darko, Johnson; Osei, Ernest

    2016-01-01

    Purpose: A recent retrospective study found 53 patients previously treated to 78Gy/39 using flattened filtered (FF) 6X-VMAT at GRRCC had rectal DVH more than one standard deviation higher than the average. This study was to investigate if using 6FFFor10FFF beams could reduce these DVHs without compromising target coverage. Methods: Twenty patients’ plans were re-planed with 2-arc 6X-VMAT, 6FFF-VMAT and 10FFF-VMAT using the Eclipse TPS following departmental protocol. All plans had the same optimization and normalization, and were evaluated against the acceptance criteria from the QUANTEC and Emami. Statistical differences in the mean dose to OARs (D m ) and PTV homogeneity index (HI) between energies were tested using the paired sample Wilcoxon signed rank statistical method (p<0.05). Beam delivery accuracy was checked on five patients using portal dosimetry (PD). Results: The PTV HI for the 10FFF shows no statistical difference from the 6X. All the OARs, except left femoral head with 6FFF, have significantly lower Dm using 6FFF and 10FFF .There is no difference in the maximum doses to rectum and bladder and are limited by the prescribed doses. Measurements show good agreements in the gamma evaluation (3%/3mm) for all energies. Conclusion: This preliminary study shows that doses to the OARs are reduced using 10FFF for the same target coverage. The plans using 6FFF result in lower doses to some OARs, and statistically different PTV HI. All plans showed very good agreement with measurements.

  18. Poster - 56: Preliminary comparison of FF- and FFF-VMAT for prostate plans with higher rectal dose

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Baochang; Darko, Johnson; Osei, Ernest [Grand River Regional Cancer Centre, Kitchener, Ontario (Canada)

    2016-08-15

    Purpose: A recent retrospective study found 53 patients previously treated to 78Gy/39 using flattened filtered (FF) 6X-VMAT at GRRCC had rectal DVH more than one standard deviation higher than the average. This study was to investigate if using 6FFFor10FFF beams could reduce these DVHs without compromising target coverage. Methods: Twenty patients’ plans were re-planed with 2-arc 6X-VMAT, 6FFF-VMAT and 10FFF-VMAT using the Eclipse TPS following departmental protocol. All plans had the same optimization and normalization, and were evaluated against the acceptance criteria from the QUANTEC and Emami. Statistical differences in the mean dose to OARs (D{sub m}) and PTV homogeneity index (HI) between energies were tested using the paired sample Wilcoxon signed rank statistical method (p<0.05). Beam delivery accuracy was checked on five patients using portal dosimetry (PD). Results: The PTV HI for the 10FFF shows no statistical difference from the 6X. All the OARs, except left femoral head with 6FFF, have significantly lower Dm using 6FFF and 10FFF .There is no difference in the maximum doses to rectum and bladder and are limited by the prescribed doses. Measurements show good agreements in the gamma evaluation (3%/3mm) for all energies. Conclusion: This preliminary study shows that doses to the OARs are reduced using 10FFF for the same target coverage. The plans using 6FFF result in lower doses to some OARs, and statistically different PTV HI. All plans showed very good agreement with measurements.

  19. Career Planning Modules for the Officer Career Information and Planning System.

    Science.gov (United States)

    Phillips, Susan D.; And Others

    This discussion of the modules in an experimental computer-aided system for officer career information and planning system (OCIPS) includes the reasons for its development, a description of the seven modules, and the findings of a preliminary test of four of the modules for feasibility and credibility. Initially developed in response to a need…

  20. Using Optimization to Improve Test Planning

    Science.gov (United States)

    2017-09-01

    OPTIMIZATION TO IMPROVE TEST PLANNING by Arlene M. Payne September 2017 Thesis Advisor: Jeffrey E. Kline Second Reader: Oleg A. Yakimenko THIS... Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE September 2017 3. REPORT TYPE AND DATES COVERED Master’s...thesis 4. TITLE AND SUBTITLE USING OPTIMIZATION TO IMPROVE TEST PLANNING 5. FUNDING NUMBERS 6. AUTHOR(S) Arlene M. Payne 7. PERFORMING ORGANIZATION

  1. Testing a Preliminary Live with Love Conceptual Framework for cancer couple dyads: A mixed-methods study.

    Science.gov (United States)

    Li, Qiuping; Xu, Yinghua; Zhou, Huiya; Loke, Alice Yuen

    2015-12-01

    The purpose of this study was to test the previous proposed Preliminary Live with Love Conceptual Framework (P-LLCF) that focuses on spousal caregiver-patient couples in their journey of coping with cancer as dyads. A mixed-methods study that included qualitative and quantitative approaches was conducted. Methods of concept and theory analysis, and structural equation modeling (SEM) were applied in testing the P-LLCF. In the qualitative approach in testing the concepts included in the P-LLCF, a comparison was made between the P-LLCF with a preliminary conceptual framework derived from focus group interviews among Chinese couples' coping with cancer. The comparison showed that the concepts identified in the P-LLCF are relevant to the phenomenon under scrutiny, and attributes of the concepts are consistent with those identified among Chinese cancer couple dyads. In the quantitative study, 117 cancer couples were recruited. The findings showed that inter-relationships exist among the components included in the P-LLCF: event situation, dyadic mediators, dyadic appraisal, dyadic coping, and dyadic outcomes. In that the event situation will impact the dyadic outcomes directly or indirectly through Dyadic Mediators. The dyadic mediators, dyadic appraisal, and dyadic coping are interrelated and work together to benefit the dyadic outcomes. This study provides evidence that supports the interlinked components and the relationship included in the P-LLCF. The findings of this study are important in that they provide healthcare professionals with guidance and directions according to the P-LLCF on how to plan supportive programs for couples coping with cancer. Copyright © 2015 Elsevier Ltd. All rights reserved.

  2. Preliminary Test for Nonlinear Input Output Relations in SISO Systems

    DEFF Research Database (Denmark)

    Knudsen, Torben

    2000-01-01

    This paper discusses and develops preliminary statistical tests for detecting nonlinearities in the deterministic part of SISO systems with noise. The most referenced method is unreliable for common noise processes as e.g.\\ colored. Therefore two new methods based on superposition and sinus input...

  3. Suggestions and comments about preliminary plans of ABNT 20:04.002-001 standard 'Seismic actions for nuclear facilities project'

    International Nuclear Information System (INIS)

    Soares, W.A.

    1984-01-01

    This paper presents an analysis of preliminary plans of standard 'seismic actions for nuclear facilities project'. This document presents since seismic event characterization up to details of structural project of nuclear facilities construction. (C.M.)

  4. Preliminary test results and CFD analysis for moderator circulation test at Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, H.T. [Korea Atomic Energy Research Inst., Daejeon (Korea, Republic of); Im, S.H.; Sung, H.J. [Korea Advanced Inst. of Science and Tech., Daejeon (Korea, Republic of); Seo, H.; Bang, I.C. [Ulsan National Inst. of Science and Tech., Ulsan (Korea, Republic of)

    2014-07-01

    Korea Atomic Energy Research Institute (KAERI) is carrying out a scaled-down moderator test program to simulate the CANDU6 moderator circulation phenomena during steady state operation and accident conditions. This research program includes the construction of the Moderator Circulation Test (MCT) facility, production of the validation data for self-reliant CFD tools, and development of optical measurement system using the Particle Image Velocimetry (PIV). The MCT facility includes a primary circulation loop (pipe lines, a primary side pump, a heat exchanger, valves, flow meters) and a secondary side loop (pipe lines, a secondary side pump, and an external cooling tower). The loop leakage test and non-heating test are performed in the present work. In the present work the PIV technique is used to measure the velocity distributions in the scaled moderator tank of MCT under iso-thermal test conditions. The preliminary PIV measurement data are obtained and compared with CFX code predictions. (author)

  5. Preliminary test results and CFD analysis for moderator circulation test at Korea

    International Nuclear Information System (INIS)

    Kim, H.T.; Im, S.H.; Sung, H.J.; Seo, H.; Bang, I.C.

    2014-01-01

    Korea Atomic Energy Research Institute (KAERI) is carrying out a scaled-down moderator test program to simulate the CANDU6 moderator circulation phenomena during steady state operation and accident conditions. This research program includes the construction of the Moderator Circulation Test (MCT) facility, production of the validation data for self-reliant CFD tools, and development of optical measurement system using the Particle Image Velocimetry (PIV). The MCT facility includes a primary circulation loop (pipe lines, a primary side pump, a heat exchanger, valves, flow meters) and a secondary side loop (pipe lines, a secondary side pump, and an external cooling tower). The loop leakage test and non-heating test are performed in the present work. In the present work the PIV technique is used to measure the velocity distributions in the scaled moderator tank of MCT under iso-thermal test conditions. The preliminary PIV measurement data are obtained and compared with CFX code predictions. (author)

  6. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2008-01-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells

  8. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  9. Integration and test planning patterns in different organizations

    NARCIS (Netherlands)

    Jong, de I.S.M.; Boumen, R.; Mortel - Fronczak, van de J.M.; Rooda, J.E.; Tretmans, J.

    2007-01-01

    Planning an integration and test phase is often done by experts in the visited organizations. These experts have a thorough knowledge about the system, integration and testing and the business drivers of an organization. An integration and test plan developedfor an airplane is different than the

  10. A closer look at the effect of preliminary goodness-of-fit testing for normality for the one-sample t-test.

    Science.gov (United States)

    Rochon, Justine; Kieser, Meinhard

    2011-11-01

    Student's one-sample t-test is a commonly used method when inference about the population mean is made. As advocated in textbooks and articles, the assumption of normality is often checked by a preliminary goodness-of-fit (GOF) test. In a paper recently published by Schucany and Ng it was shown that, for the uniform distribution, screening of samples by a pretest for normality leads to a more conservative conditional Type I error rate than application of the one-sample t-test without preliminary GOF test. In contrast, for the exponential distribution, the conditional level is even more elevated than the Type I error rate of the t-test without pretest. We examine the reasons behind these characteristics. In a simulation study, samples drawn from the exponential, lognormal, uniform, Student's t-distribution with 2 degrees of freedom (t(2) ) and the standard normal distribution that had passed normality screening, as well as the ingredients of the test statistics calculated from these samples, are investigated. For non-normal distributions, we found that preliminary testing for normality may change the distribution of means and standard deviations of the selected samples as well as the correlation between them (if the underlying distribution is non-symmetric), thus leading to altered distributions of the resulting test statistics. It is shown that for skewed distributions the excess in Type I error rate may be even more pronounced when testing one-sided hypotheses. ©2010 The British Psychological Society.

  11. Preliminary hazard analysis for the Brayton Isotope Ground Demonstration System (including vacuum test chamber)

    International Nuclear Information System (INIS)

    Miller, L.G.

    1975-01-01

    The Preliminary Hazard Analysis (PHA) of the BIPS-GDS is a tabular summary of hazards and undesired events which may lead to system damage or failure and/or hazard to personnel. The PHA reviews the GDS as it is envisioned to operate in the Vacuum Test Chamber (VTC) of the GDS Test Facility. The VTC and other equipment which will comprise the test facility are presently in an early stage of preliminary design and will undoubtedly undergo numerous changes before the design is frozen. The PHA and the FMECA to follow are intended to aid the design effort by identifying areas of concern which are critical to the safety and reliability of the BIPS-GDS and test facility

  12. Test Plan: WIPP bin-scale CH TRU waste tests

    International Nuclear Information System (INIS)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs

  13. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  14. Preliminary results of a test of a longitudinal phase-space monitor

    International Nuclear Information System (INIS)

    Kikutani, Eiji; Funakoshi, Yoshihiro; Kawamoto, Takashi; Mimashi, Toshihiro

    1994-01-01

    A prototype of a longitudinal phase-space monitor has been developed in TRISTAN Main Ring at KEK. The principle of the monitor and its basic components are explained. Also a result of a preliminary beam test is given. (author)

  15. ORCWM test and evaluaton master plan. Revision 00

    International Nuclear Information System (INIS)

    1995-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Test and Evaluation Master Plan (TEMP) describes the program Test and Evaluation (T ampersand E) policy, objectives, requirements, general methodology (test flow and description of each T ampersand E phase), responsibilities, and scheduling of test phases for the Civilian Radioactive Waste Management System (CRWMS). This TEMP is a program-level management planning document for al CRWMS T ampersand E activities and will be used in conjunction with Section 11 of the Quality Assurance Requirements and Description (QARD), as appropriate, as a guide for the projects in developing their T ampersand E plans. In the OCRWM document hierarchy, that is described in the OCRWM Systems Engineering Management Plan (SEMP), the TEMP is subordinate to the program SEMP. To ensure CRWMS operates as an integrated system, the plans for verifying the performance and evaluating the operational suitability and effectiveness of the overall system are also described. Test and evaluation is an integral part of the systems engineering process. Key aspects of the systems engineering process, more fully described in the OCRWM SEMP, are discussed in this TEMP to illustrate how T ampersand E supports the overall systems engineering process

  16. Preliminary tests on a new near-infrared continuous-wave tissue oximeter

    Science.gov (United States)

    Casavola, Claudia; Cicco, Giuseppe; Pirrelli, Anna; Lugara, Pietro M.

    2000-11-01

    We present a preliminary study, in vitro and in vivo, with a novel device for near-infrared tissue oximetry. The light sources used are two quasi-continuous-wave LEDs, emitting at 656 and 851 nm, and the detector is a photodiode. The data are acquired in back-scattering configuration, thus allowing the non-invasive characterization of thick tissues. Stability tests were performed by placing the optical probe on a tissue- like phantom and acquiring data for periods of time ranging from 5 to 40 minutes. No significant drifts in the DC signal were observed after a warm-up period of no more than 10 minutes. We performed reproducibility tests by repositioning the optical probe on the phantom for a number of times. We found a reproducibility better than 5% in the DC signal. We also present the results of a preliminary study conducted in vivo, on the calf muscle of human subjects. We report a comparison of the results obtained with the near-infrared oximeter with the values of blood oxygenation ctO2 measured with conventional chemical tests.

  17. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    Science.gov (United States)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  18. Preliminary Test on Hydraulic Rotation Device for Neutron Transmutation Doping

    International Nuclear Information System (INIS)

    Park, Ki-Jung; Kang, Han-Ok; Kim, Seong Hoon; Park, Cheol

    2014-01-01

    The Korea Atomic Energy Research Institute (KAERI) is developing a new Research Reactor (KJRR) which will be located at KIJANG in the south-eastern province of Korea. The KJRR will be mainly utilized for isotope production, NTD production, and the related research activities. During the NTD process, the irradiation rig containing the silicon ingot rotates at the constant speed to ensure precisely defined homogeneity of the irradiation. A new NTD Hydraulic Rotation Device (NTDHRD) is being developed to rotate the irradiation rigs at the required speed. In this study, the preliminary test and the analysis for the rotation characteristic of the NTDHRD, which is developed through the conceptual design, are described. A new NTD hydraulic rotation device is being developed for the purpose of application to the KIJANG research reactor (KJRR). The preliminary test and analysis for the rotation characteristic of the NTDHRD, which is developed through the conceptual design, are conducted in experimental apparatus. The film thickness by the thrust bearing is measured and the minimum required mass flow rate for stable rotation is determined

  19. Test plan for ISV laboratory-pyrolysis testing

    Energy Technology Data Exchange (ETDEWEB)

    McAtee, R.E.

    1991-09-01

    The objective of the laboratory-pyrolysis studies is to obtain information on the high temperature (< 1200{degree}C) degradation and alteration of organic chemicals and materials similar to those found in the Radioactive Waste Management Complex, Pit 9. This test plan describes experimental procedures, sampling and analysis strategy, sampling procedures, sample control, and document management. It addresses safety issues in the experimental apparatus and procedures, personal training, and hazardous waste disposal. Finally, it describes the data quality objectives using the EPA tiered approach to treatability studies to define where research/scoping tests fit into these studies and the EPA analytical levels required for the tests.

  20. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    S. E. Rawlinson

    2001-09-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

  1. Irradiation Test Plan and Safety Analysis of the Fatigue Capsule(05S-05K)

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Man Soon; Kim, B. G.; Kang, Y. H.; Choo, K. N.; Sohn, J. M.; Park, S. J.; Shin, Y. T.; Seo, C. K

    2007-01-15

    In this report, the design, fabrication, the out-pile test and the irradiation test plan of the fatigue capsule 05S-05K were described and the safety aspect during the design, fabrication and irradiation test was reviewed. A cyclic load device necessary for the fatigue test was newly designed and manufactured. By using the cyclic load device the performance test and the preliminary fatigue test were performed with STS316L specimen of {phi}1.8 mm x 12.5 mm gage length under the same condition(550 .deg. C) as the temperature of the specimen during the irradiation test. As a result of the test, the fracture of the specimen occurs at a total of 70,120 cycles, at which the displacement was 2.02 mm. The reactivity effect was reviewed and an analysis for the structural and thermal integrity was performed to review the safety of the capsule, which will be irradiated at a temperature higher than 550 .deg. C And the thermal analysis shows that the temperatures of the parts are less than the melting temperatures of the corresponding materials. The structural analysis considering this temperature shows that the combined stress on the outer tube is less than the allowable stress limits and so the structural integrity is maintained.

  2. Preliminary results of the round-robin testing of F82H

    Energy Technology Data Exchange (ETDEWEB)

    Shiba, K.; Yamanouchi, N.; Tohyama, A.

    1996-10-01

    Preliminary results of metallurgical, physical and mechanical properties of low activation ferritic steel F82H (IEA heat) were obtained in the round-robin test in Japan. The properties of IEA heat F82H were almost the same as the original F82H.

  3. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    Energy Technology Data Exchange (ETDEWEB)

    Cox, S.; Benioff, R.

    2011-05-01

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  4. Ice condenser experimental plan

    International Nuclear Information System (INIS)

    Kannberg, L.D.; Piepel, G.F.; Owczarski, P.C.; Liebetrau, A.M.

    1986-01-01

    An experimental plan is being developed to validate the computer code ICEDF. The code was developed to estimate the extent of aerosol retention in the ice compartments of pressurized water reactor ice condenser containment systems during severe accidents. The development of the experimental plan began with review of available information on the conditions under which the code will be applied. Computer-generated estimates of thermohydraulic and aerosol conditions entering the ice condenser were evaluated and along with other information, used to generate design criteria. The design criteria have been used for preliminary test assembly design and for generation of statistical test designs. Consideration of the phenomena to be evaluated in the testing program, as well as equipment and measurement limitations, have led to changes in the design criteria and to subsequent changes in the test assembly design and statistical test design. The overall strategy in developing the experimental plan includes iterative generation and evaluation of candidate test designs using computer codes for statistical test design and ICEDF for estimation of experimental results. Estimates of experimental variability made prior to actual testing will be verified by replicate testing at preselected design points

  5. CAREER PLANS OF GRADUATES OF A CANADIAN DENTAL SCHOOL: PRELIMINARY REPORT OF A 5-YEAR SURVEY.

    Science.gov (United States)

    Nassar, Usama; Fairbanks, Connor; Flores-Mir, Carlos; Kilistoff, Alan; Easton, Rick

    2016-07-01

    Comprehensive data on the characteristics and opinions of graduating dental students in Canada are lacking. Specifically, only minimal information is available on graduates' immediate career plans and factors that may influence their decisions regarding these plans. Our aim was to gather such data to allow better understanding of this issue and improve the design of future studies on this topic. The Career Development Committee at the school of dentistry, University of Alberta, designed a short survey to be administered to graduating students over 5 years to gain insight into their immediate career plans and opinions on career services at the school. Preliminary results from 2012-2014 are reported here. With a response rate of close to 90% (n = 99/111), the data reveal considerable differences in immediate career plans between the surveyed students and those in other schools in Canada and the United States. Of the students, 89% were planning to work in a general dental practice and only 9% were planning to enroll in advanced education, including general practice residency training. More research is needed to better understand the factors affecting career path decisions of students.

  6. Preliminary design for hot dirty-gas control-valve test facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    This report presents the results of a preliminary design and cost estimating effort for a facility for the testing of control valves in Hot Dirty Gas (HDGCV) service. This design was performed by Mittelhauser Corporation for the United States Department of Energy's Morgantown Energy Technology Center (METC). The objective of this effort was to provide METC with a feasible preliminary design for a test facility which could be used to evaluate valve designs under simulated service conditions and provide a technology data base for DOE and industry. In addition to the actual preliminary design of the test facility, final design/construction/operating schedules and a facility cost estimate were prepared to provide METC sufficient information with which to evaluate this design. The bases, assumptions, and limitations of this study effort are given. The tasks carried out were as follows: METC Facility Review, Environmental Control Study, Gas Generation Study, Metallurgy Review, Safety Review, Facility Process Design, Facility Conceptual Layout, Instrumentation Design, Cost Estimates, and Schedules. The report provides information regarding the methods of approach used in the various tasks involved in the completion of this study. Section 5.0 of this report presents the results of the study effort. The results obtained from the above-defined tasks are described briefly. The turnkey cost of the test facility is estimated to be $9,774,700 in fourth quarter 1979 dollars, and the annual operating cost is estimated to be $960,000 plus utilities costs which are not included because unit costs per utility were not available from METC.

  7. Testing of the assisting software for radiologists analysing head CT images: lessons learned.

    Science.gov (United States)

    Martynov, Petr; Mitropolskii, Nikolai; Kukkola, Katri; Gretsch, Monika; Koivisto, Vesa-Matti; Lindgren, Ilkka; Saunavaara, Jani; Reponen, Jarmo; Mäkynen, Anssi

    2017-12-11

    Assessing a plan for user testing and evaluation of the assisting software developed for radiologists. Test plan was assessed in experimental testing, where users performed reporting on head computed tomography studies with the aid of the software developed. The user testing included usability tests, questionnaires, and interviews. In addition, search relevance was assessed on the basis of user opinions. The testing demonstrated weaknesses in the initial plan and enabled improvements. Results showed that the software has acceptable usability level but some minor fixes are needed before larger-scale pilot testing. The research also proved that it is possible even for radiologists with under a year's experience to perform reporting of non-obvious cases when assisted by the software developed. Due to the small number of test users, it was impossible to assess effects on diagnosis quality. The results of the tests performed showed that the test plan designed is useful, and answers to the key research questions should be forthcoming after testing with more radiologists. The preliminary testing revealed opportunities to improve test plan and flow, thereby illustrating that arranging preliminary test sessions prior to any complex scenarios is beneficial.

  8. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

  9. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

  10. Surface stability test plan for protective barriers

    International Nuclear Information System (INIS)

    Ligotke, M.W.

    1989-01-01

    Natural-material protective barriers for long-term isolation of buried waste have been identified as integral components of a plan to isolate a number of Hanford defense waste sites. Standards currently being developed for internal and external barrier performance will mandate a barrier surface layer that is resistant to the eolian erosion processes of wind erosion (deflation) and windborne particle deposition (formation of sand dunes). Thus, experiments are needed to measure rates of eolian erosion processes impacting those surfaces under different surface and climatological conditions. Data from these studies will provide information for use in the evaluation of selected surface layers as a means of providing stable cover over waste sites throughout the design life span of protective barriers. The multi-year test plan described in this plan is directed at understanding processes of wind erosion and windborne particle deposition, providing measurements of erosion rates for models, and suggesting construction materials and methods for reducing the effect of long-term eolian erosion on the barrier. Specifically, this plan describes possible methods to measure rates of eolian erosion, including field and laboratory procedure. Advantages and disadvantages of laboratory (wind tunnel) tests are discussed, and continued wind tunnel tests are recommended for wind erosion studies. A comparison between field and wind tunnel erosive forces is discussed. Plans for testing surfaces are described. Guidance is also presented for studying the processes controlling sand dune and blowout formation. 24 refs., 7 figs., 3 tabs

  11. Generating custom test plans for CASE{sup *}Dictionary 5.0

    Energy Technology Data Exchange (ETDEWEB)

    Atkins, K.D. [Boeing Computer Services, Richland, WA (United States)

    1994-04-01

    Most database development organizations use a formal software development methodology that requires a certain amount of formal testing. The amount of formal testing that will be performed will vary from methodology to methodology and from site to site. If a very detailed formal test plan is required for each module in a system, the work involved to produce the test plan can be tedious and costly. After a system has been designed and developed using Oracle*CASE, there is much useful information in the CASE*Dictionary repository. If this information could be tied to specific test requirements, a test plan could be generated automatically, saving much time and resources. This paper shows how CASE*Dictionary can be used to store test plan information that can then be used to generate a specific test plan for each module based on it`s detailed data usage.

  12. The picture test of separation and individuation - preliminary research

    Directory of Open Access Journals (Sweden)

    Gregor Žvelc

    2000-06-01

    Full Text Available Authors introduce a new instrument, which they developed for measuring separation and individuation process and attachment in adolescence and adulthood. The Picture Test of Separation and Individuation (PTSI is a semi–projective test. It consists of various pictures, which represent relationships with significant others. PTSI is divided into three subtests: Relationship with Mother, Relationship with Father and Attachment. In a preliminary research on a sample of college and university students authors studied basic properties of the test. The results of the research indicate that PTSI is consistent with theoretical background, has good sensitivity and is economical. The Picture Test of Separation and Individuation enables quick but complex insight into individual's relationships with significant others as well as into his/her stage of separation and individuation process. Considering satisfying results of pilot study, authors suggest further research for validation of the test.

  13. Energy Efficient Engine: Control system preliminary definition report

    Science.gov (United States)

    Howe, David C.

    1986-01-01

    The object of the Control Preliminary Definition Program was to define a preliminary control system concept as a part of the Energy Efficient Engine program. The program was limited to a conceptual definition of a full authority digital electronic control system. System requirements were determined and a control system was conceptually defined to these requirements. Areas requiring technological development were identified and a plan was established for implementing the identified technological features, including a control technology demonstration. A significant element of this program was a study of the potential benefits of closed-loop active clearance control, along with laboratory tests of candidate clearance sensor elements for a closed loop system.

  14. Innovative thin silicon detectors for monitoring of therapeutic proton beams: preliminary beam tests

    Science.gov (United States)

    Vignati, A.; Monaco, V.; Attili, A.; Cartiglia, N.; Donetti, M.; Fadavi Mazinani, M.; Fausti, F.; Ferrero, M.; Giordanengo, S.; Hammad Ali, O.; Mandurrino, M.; Manganaro, L.; Mazza, G.; Sacchi, R.; Sola, V.; Staiano, A.; Cirio, R.; Boscardin, M.; Paternoster, G.; Ficorella, F.

    2017-12-01

    To fully exploit the physics potentials of particle therapy in delivering dose with high accuracy and selectivity, charged particle therapy needs further improvement. To this scope, a multidisciplinary project (MoVeIT) of the Italian National Institute for Nuclear Physics (INFN) aims at translating research in charged particle therapy into clinical outcome. New models in the treatment planning system are being developed and validated, using dedicated devices for beam characterization and monitoring in radiobiological and clinical irradiations. Innovative silicon detectors with internal gain layer (LGAD) represent a promising option, overcoming the limits of currently used ionization chambers. Two devices are being developed: one to directly count individual protons at high rates, exploiting the large signal-to-noise ratio and fast collection time in small thicknesses (1 ns in 50 μm) of LGADs, the second to measure the beam energy with time-of-flight techniques, using LGADs optimized for excellent time resolutions (Ultra Fast Silicon Detectors, UFSDs). The preliminary results of first beam tests with therapeutic beam will be presented and discussed.

  15. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    International Nuclear Information System (INIS)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan

  16. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  17. Thick Concrete Specimen Construction, Testing, and Preliminary Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, Dwight A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hoegh, Kyle [Univ. of Minnesota, Minneapolis, MN (United States); Khazanovich, Lev [Univ. of Minnesota, Minneapolis, MN (United States)

    2015-03-01

    The purpose of the U.S. Department of Energy Office of Nuclear Energy’s Light Water Reactor Sustainability (LWRS) Program is to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the operating lifetimes of nuclear power plants (NPPs) beyond 60 years. Since many important safety structures in an NPP are constructed of concrete, inspection techniques must be developed and tested to evaluate the internal condition. In-service containment structures generally do not allow for the destructive measures necessary to validate the accuracy of these inspection techniques. This creates a need for comparative testing of the various nondestructive evaluation (NDE) measurement techniques on concrete specimens with known material properties, voids, internal microstructure flaws, and reinforcement locations. A preliminary report detailed some of the challenges associated with thick reinforced concrete sections and prioritized conceptual designs of specimens that could be fabricated to represent NPP concrete structures for using in NDE evaluation comparisons. This led to the construction of the concrete specimen presented in this report, which has sufficient reinforcement density and cross-sectional size to represent an NPP containment wall. Details on how a suitably thick concrete specimen was constructed are presented, including the construction materials, final nominal design schematic, as well as formwork and rigging required to safely meet the desired dimensions of the concrete structure. The report also details the type and methods of forming the concrete specimen as well as information on how the rebar and simulated defects were embedded. Details on how the resulting specimen was transported, safely anchored, and marked to allow access for systematic comparative NDE testing of defects in a representative NPP containment wall concrete specimen are also given. Data collection using the MIRA Ultrasonic NDE equipment and

  18. [New visual field testing possibilities (a preliminary report)].

    Science.gov (United States)

    Erichev, V P; Ermolaev, A P; Antonov, A A; Grigoryan, G L; Kosova, D V

    2018-01-01

    There are currently no portable mobile perimeters that allow visual field testing outside ophthalmologist's examination rooms. To develop a mobile perimetry technique based on use of a virtual reality headset (VR). The study involved 26 patients (30 eyes) with II-III stage primary open-angle glaucoma (POAG) with compensated IOP. Perimetry was performed for each patient twice - on Humphrey analyzer (test 30-2, 76 points) and employing similar strategy on a perimeter integrated into VR headset (Total Vision, Russia). Visual field testing was performed with an interval from 1 hour to 3 days. The results were comparatively analyzed. Patients tolerated the examination well. Comparative analysis of preliminary perimetry results obtained with both methods showed high degree of identity, so the results were concluded to be comparable. By visually isolating the wearer, VR headset achieves elimination of distractions and stable light conditions for visual field testing. The headset-perimeter is compact, mobile, easily transportable, can be used in the work of visiting medical teams and for examination at home.

  19. Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

    International Nuclear Information System (INIS)

    Nelson, J.L.

    1987-09-01

    This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs

  20. The importance of pre-planning for large hydrostatic test programs

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Andrew Keith [WorleyParsons Calgary, Calgary, AB (Canada); Wong, Everett Clementi [Enbridge Pipelines Inc., Edmonton, AB (Canada)

    2010-07-01

    During the design phase of a pipeline project, large hydrostatic test programs are required to locate and secure water sources. Many companies complete hydrostatic test planning through high level desktop analysis, however this technique can result in important unplanned costs and schedule delays. The aim of this paper is to assess the cost benefits of pre-planning large hydrostatic test programs versus the costs of unplanned delays in the execution of hydrostatic testing. This comparison was based on the successful application of pre-planning of 57 mainline hydrostatic tests in the construction of the Line 4 Extension and Alberta Clipper Expansion oil pipelines by Enbridge Pipelines Inc. Results showed that costs of delays and uncertainty during construction far outweigh the costs of pre-planning. This study highlighted that pre-planning for large hydrostatic test programs should be carried out in the execution of large pipeline projects to ensure success.

  1. Test plan for spent fuel cladding containment credit tests

    International Nuclear Information System (INIS)

    Wilson, C.N.

    1983-11-01

    Lawrence Livermore National Laboratory has chosen Westinghouse Hanford Company as a subcontractor to assist them in determining the requirements for successful disposal of spent fuel rods in the proposed Nevada Test Site repository. An initial scoping test, with the objective of determining whether or not the cladding of a breached fuel rod can be given any credit as an effective barrier to radionuclide release, is described in this test plan. 8 references, 2 figures, 4 tables

  2. Preliminary observations of gate valve flow interruption tests, Phase 2

    International Nuclear Information System (INIS)

    Steele, R. Jr.; DeWall, K.G.

    1990-01-01

    This paper presents preliminary observations from the US Nuclear Regulatory Commission/Idaho National Engineering Laboratory Flexible Wedge Gate Valve Qualification and Flow Interruption Test Program, Phase 2. The program investigated the ability of selected boiling water reactor (BWR) process line valves to perform their containment isolation function at high energy pipe break conditions and other more normal flow conditions. The fluid and valve operating responses were measured to provide information concerning valve and operator performance at various valve loadings so that the information could be used to assess typical nuclear industry motor operator sizing equations. Six valves were tested, three 6-in. isolation valves representative of those used in reactor water cleanup systems in BWRs and three 10-in. isolation valves representative of those used in BWR high pressure coolant injection (HPCI) steam lines. The concern with these normally open isolation valves is whether they will close in the event of a downstream pipe break outside of containment. The results of this testing will provide part of the technical insights for NRC efforts regarding Generic Issue 87 (GI-87), Failure of the HPCI Steam Line Without Isolation, which includes concerns about the uncertainties in gate valve motor operator sizing and torque switch settings for these BWR containment isolation valves. As of this writing, the Phase 2 test program has just been completed. Preliminary observations made in the field confirmed most of the results from the Phase 1 test program. All six valves closing in high energy water, high energy steam, and high pressure cold water require more force to close than would be calculated using the typical variables in the standard industry motor operator sizing equations

  3. Open test assembly (OTA) shear demonstration testing work/test plan

    International Nuclear Information System (INIS)

    Hiller, S.W.

    1998-01-01

    This document describes the development testing phase associated with the OTA Shear activity and defines the controls to be in place throughout the testing. The purpose of the OTA Shear Program was to provide equipment that is needed for the processing of 40 foot long, sodium wetted, irradiated core components previously used in the FFTF reactor to monitor fuel and materials tests. There are currently 15 of these OTA test stalks located in the Test Assembly Conditioning Station (TACS) inerted vault. These need to be dispositioned for a shutdown mission to eliminate this highly activated, high dose inventory prior to turnover to the ERC since they must be handled by remote operations. These would also need to be dispositioned for a restart mission to free up the vault they currently reside in. The waste handling and cleaning equipment in the J33M Cell was designed and built for the handling of reactor components up to the standard 12 foot length. This program will provide the equipment to the IEM Cell to remotely section the OTAS into pieces less than 12 feet in length to allow for the necessary handling and cleaning operations required for proper disposition. Due to the complexity of all operations associated with remote handling, the availability of the IEM Cell training facility, and the major difficulty with reworking contaminated equipment, it was determined that preliminary testing of the equipment was desirable, This testing activity would provide the added assurance that the equipment will operate as designed prior to performance of the formal Acceptance Test Procedure (ATP) at the IEM Cell, This testing activity will also allow for some operator familiarity and procedure checkout prior to actual installation into the IEM Cell. This development testing will therefore be performed at the conclusion of equipment fabrication and prior to transfer of the equipment to the 400 Area

  4. Failure-censored accelerated life test sampling plans for Weibull distribution under expected test time constraint

    International Nuclear Information System (INIS)

    Bai, D.S.; Chun, Y.R.; Kim, J.G.

    1995-01-01

    This paper considers the design of life-test sampling plans based on failure-censored accelerated life tests. The lifetime distribution of products is assumed to be Weibull with a scale parameter that is a log linear function of a (possibly transformed) stress. Two levels of stress higher than the use condition stress, high and low, are used. Sampling plans with equal expected test times at high and low test stresses which satisfy the producer's and consumer's risk requirements and minimize the asymptotic variance of the test statistic used to decide lot acceptability are obtained. The properties of the proposed life-test sampling plans are investigated

  5. DEEP VADOSE ZONE TREATABILITY TEST PLAN

    International Nuclear Information System (INIS)

    Chronister, G.B.; Truex, M.J.

    2009-01-01

    (sm b ullet) Treatability test plan published in 2008 (sm b ullet) Outlines technology treatability activities for evaluating application of in situ technologies and surface barriers to deep vadose zone contamination (technetium and uranium) (sm b ullet) Key elements - Desiccation testing - Testing of gas-delivered reactants for in situ treatment of uranium - Evaluating surface barrier application to deep vadose zone - Evaluating in situ grouting and soil flushing

  6. Dry-run of site investigation planning using the manual for preliminary investigation in Japan

    International Nuclear Information System (INIS)

    Akamura, Shigeki; Miwa, Tadashi; Tanaka, Tatsuya; Shiratsuchi, Hiroshi; Horio, Atsushi

    2011-01-01

    A stepwise site selection process has been adopted for geological disposal of HLW in Japan. Literature surveys, followed by preliminary investigations (PI) and, finally, detailed investigations in underground facilities will be carried out in the successive selection stages. In the PI stage, surface-based investigations such as borehole surveys and geophysical prospecting will be implemented. In order to conduct the PI appropriately and efficiently within a restricted timeframe and budget, planning and management of PI are very important. NUMO therefore compiled existing knowledge and experience in the planning and managing of investigations in the form of manuals to be used to improve and maintain internal expertise. The first editions of the two manuals were prepared on the basis of experience overseas, and then they were revised by taking technological environment, laws and regulation in Japan into consideration. This paper introduces the procedure of PI planning using manual as well as the results of the dry-run, with the Yokosuka area as a hypothetical PI area, where the monstraction study is under way. Based on the dry-run, applicability of the manual is checked and, at the same time, further revisions are made to improve the content. (author)

  7. Test plan for dig-face characterization performance testing

    International Nuclear Information System (INIS)

    Josten, N.E.

    1993-09-01

    The dig-face characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since FY 1992 through the support of the Buried Waste Integrated Demonstration Program. A Dig-face Characterization System conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation dig-face and collects data that provide a basis for detecting, locating, and identifying hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes initial efforts to test the dig-face characterization concept at the INEL Cold Test Pit using a simplified prototype apparatus and off-the-shelf sensors. The Cold Test Pit is a simulated waste site containing hazardous and radioactive waste surrogates at known locations. Testing will be directed toward three generic characterization problems: metal detection, plume detection, and radioactive source detection. The prototype apparatus will gather data using magnetometers, a ground conductivity meter, a trace gas analyzer, and a gamma ray sensor during simulated retrieval of the surrogate waste materials. The data acquired by a dig-face characterization system are unique because of the high precision, high data density, and multiple viewpoints attainable through the dig-face deployment approach. The test plan establishes procedures for collecting and validating a representative dig-face characterization data set. Analysis of these data will focus on developing criteria for predicting the depth, location, composition, and other characteristics of the surrogate waste materials. If successful, this proof-of-concept exercise will provide a foundation for future development of a fully-operational system that is capable of operating on an actual waste site

  8. Preliminary test of an imaging probe for nuclear medicine using hybrid pixel detectors

    International Nuclear Information System (INIS)

    Bertolucci, E.; Maiorino, M.; Mettivier, G.; Montesi, M.C.; Russo, P.

    2002-01-01

    We are investigating the feasibility of an intraoperative imaging probe for lymphoscintigraphy with Tc-99m tracer, for sentinel node radioguided surgery, using the Medipix series of hybrid detectors coupled to a collimator. These detectors are pixelated semiconductor detectors bump-bonded to the Medipix1 photon counting read-out chip (64x64 pixel, 170 μm pitch) or to the Medipix2 chip (256x256 pixel, 55 μm pitch), developed by the European Medipix collaboration. The pixel detector we plan to use in the final version of the probe is a semi-insulating GaAs detector or a 1-2 mm thick CdZnTe detector. For the preliminary tests presented here, we used 300-μm thick silicon detectors, hybridized via bump-bonding to the Medipix1 chip. We used a tungsten parallel-hole collimator (7 mm thick, matrix array of 64x64 100 μm circular holes with 170 μm pitch), and a 22, 60 and 122 keV point-like (1 mm diameter) radioactive sources, placed at various distances from the detector. These tests were conducted in order to investigate the general feasibility of this imaging probe and its resolving power. Measurements show the high resolution but low efficiency performance of the detector-collimator set, which is able to image the 122 keV source with <1 mm FWHM resolution

  9. Test plan for FY-91 alpha CAM evaluation

    International Nuclear Information System (INIS)

    Winberg, M.R.

    1991-03-01

    This report describes the test plan for evaluating the Merlin Gerin, Inc., Edgar alpha continuous air monitor (CAM) and associated analysis system to be conducted by Idaho National Engineering Laboratory (INEL) for the Department of Energy. INEL has evaluated other commercial alpha CAM systems to detect transuranic contaminants during waste handling and retrieval operations. This test plan outlines experimental methods, sampling methods, sampling and analysis techniques, and equipment needed and safety and quality requirements to test the commercial CAM. 8 refs., 3 figs

  10. Gallium-cladding compatibility testing plan: Phase 3: Test plan for centrally heated surrogate rodlet test. Revision 2

    International Nuclear Information System (INIS)

    Morris, R.N.; Baldwin, C.A.; Wilson, D.F.

    1998-07-01

    The Fissile Materials Disposition Program (FMDP) is investigating the use of weapons grade plutonium in mixed oxide (MOX) fuel for light-water reactors (LWR). Commercial MOX fuel has been successfully used in overseas reactors for many years; however, weapons derived fuel may differ from the previous commercial fuels because of small amounts of gallium impurities. A concern presently exists that the gallium may migrate out of the fuel, react with and weaken the clad, and thereby promote loss of fuel pin integrity. Phases 1 and 2 of the gallium task are presently underway to investigate the types of reactions that occur between gallium and clad materials. This is a Level-2 document as defined in the Fissile Materials Disposition Program Light-Water Reactor Mixed-Oxide Fuel Irradiation Test Project Plan. This Plan summarizes the projected Phase 3 Gallium-Cladding compatibility heating test and the follow-on post test examination (PTE). This work will be performed using centrally-heated surrogate pellets, to avoid unnecessary complexities and costs associated with working with plutonium and an irradiation environment. Two sets of rodlets containing pellets prepared by two different methods will be heated. Both sets will have an initial bulk gallium content of approximately 10 ppm. The major emphasis of the PTE task will be to examine the material interactions, particularly indications of gallium transport from the pellets to the clad

  11. PRELIMINARY PROJECT PLAN FOR LANSCE INTEGRATED FLIGHT PATHS 11A, 11B, 12, and 13

    International Nuclear Information System (INIS)

    Bultman, D. H.; Weinacht, D.

    2000-01-01

    This Preliminary Project Plan Summarizes the Technical, Cost, and Schedule baselines for an integrated approach to developing several flight paths at the Manual Lujan Jr. Neutron Scattering Center at the Los Alamos Neutron Science Center. For example, the cost estimate is intended to serve only as a rough order of magnitude assessment of the cost that might be incurred as the flight paths are developed. Further refinement of the requirements and interfaces for each beamline will permit additional refinement and confidence in the accuracy of all three baselines (Technical, Cost, Schedule)

  12. Preliminary data evaluation for thermal insulation characterization testing

    International Nuclear Information System (INIS)

    DeClue, J.F.; Moses, S.D.; Tollefson, D.A.

    1991-01-01

    The purpose of Thermal Insulation Characterization Testing is to provide physical data to support certain assumptions and calculational techniques used in the criticality safety calculations in Section 6 of the Safety Analysis Reports for Packaging (SARPs) for drum-type packaging for Department of Energy's (DOE) Oak Ridge Y-12 Plant, managed by Martin Marietta Energy Systems, Inc. Results of preliminary data evaluation regarding the fire-test condition reveal that realistic weight loss consideration and residual material characterization in developing calculational models for the hypothetical accident condition is necessary in order to prevent placement of unduly conservative restrictions on shipping requirements as a result of overly conservative modeling. This is particularly important for fast systems. Determination of the geometric arrangement of residual material is of secondary importance. Both the methodology used to determine the minimum thermal insulation mass remaining after the fire test and the treatment of the thermal insulation in the criticality safety calculational models requires additional evaluation. Specific testing to be conducted will provide experimental data with which to validate the mass estimates and calculational modeling techniques for extrapolation to generic drum-type containers

  13. Engineering test facility

    International Nuclear Information System (INIS)

    Steiner, D.; Becraft, W.R.; Sager, P.H.

    1981-01-01

    The vehicle by which the fusion program would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The ETF would provide a test-bed for reactor components in the fusion environment. In order to initiate preliminary planning for the ETF decision, the Office of Fusion Energy established the ETF Design Center activity to prepare the design of the ETF. This paper described the design status of the ETF

  14. Hydraulically driven control rod concept for integral reactors: fluid dynamic simulation and preliminary test

    International Nuclear Information System (INIS)

    Ricotti, M.E.; Cammi, A.; Lombardi, C.; Passoni, M.; Rizzo, C.; Carelli, M.; Colombo, E.

    2003-01-01

    The paper deals with the preliminary study of the Hydraulically Driven Control Rod concept, tailored for PWR control rods (spider type) with hydraulic drive mechanism completely immersed in the primary water. A specific solution suitable for advanced versions of the IRIS integral reactor is under investigation. The configuration of the Hydraulic Control Rod device, made up by an external movable piston and an internal fixed cylinder, is described. After a brief description of the whole control system, particular attention is devoted to the Control Rod characterization via Computational Fluid Dynamics (CFD) analysis. The investigation of the system behavior, including dynamic equilibrium and stability properties, has been carried out. Finally, preliminary tests were performed in a low pressure, low temperature, reduced length experimental facility. The results are compared with the dynamic control model and CFD simulation model, showing good agreement between simulations and experimental data. During these preliminary tests, the control system performs correctly, allowing stable dynamic equilibrium positions for the Control Rod and stable behavior during withdrawal and insertion steps. (author)

  15. Preliminary Calculations of Bypass Flow Distribution in a Multi-Block Air Test

    International Nuclear Information System (INIS)

    Kim, Min Hwan; Tak, Nam Il

    2011-01-01

    The development of a methodology for the bypass flow assessment in a prismatic VHTR (Very High Temperature Reactor) core has been conducted at KAERI. A preliminary estimation of variation of local bypass flow gap size between graphite blocks in the NHDD core were carried out. With the predicted gap sizes, their influence on the bypass flow distribution and the core hot spot was assessed. Due to the complexity of gap distributions, a system thermo-fluid analysis code is suggested as a tool for the core thermo-fluid analysis, the model and correlations of which should be validated. In order to generate data for validating the bypass flow analysis model, an experimental facility for a multi-block air test was constructed at Seoul National University (SNU). This study is focused on the preliminary evaluation of flow distribution in the test section to understand how the flow is distributed and to help the selection of experimental case. A commercial CFD code, ANSYS CFX is used for the analyses

  16. Windows Calorimeter Control (WinCal) program computer software test plan

    International Nuclear Information System (INIS)

    Pertzborn, N.F.

    1997-01-01

    This document provides the information and guidelines necessary to conduct all the required testing of the Windows Calorimeter Control (WinCal) system. The strategy and essential components for testing the WinCal System Project are described in this test plan. The purpose of this test plan is to provide the customer and performing organizations with specific procedures for testing the specified system's functions

  17. Preliminary investigation on determination of radionuclide distribution in field tracing test site

    International Nuclear Information System (INIS)

    Tanaka, Tadao; Mukai, Masayuki; Takebe, Shinichi; Guo Zede; Li Shushen; Kamiyama, Hideo.

    1993-12-01

    Field tracing tests for radionuclide migration have been conducted by using 3 H, 60 Co, 85 Sr and 134 Cs, in the natural unsaturated loess zone at field test site of China Institute for Radiation Protection. It is necessary to obtain confidable distribution data of the radionuclides in the test site, in order to evaluate exactly the migration behavior of the radionuclides in situ. An available method to determine the distribution was proposed on the basis of preliminary discussing results on sampling method of soils from the test site and analytical method of radioactivity in the soils. (author)

  18. Configuration management plan for Machine Interface Test System (MITS)

    International Nuclear Information System (INIS)

    O'Neill, C.K.

    1980-01-01

    The discipline required by this plan will apply from the establishment of a configuration baseline until completion of the final test in the MITS. The plan applies to configured items of hardware and software as well as to the specifications and drawings for these items. The plan encompasses establishment of the facility baseline, interface definition, classes of change, change control, change paper, organizational responsibilities and relationships, test configuration (as opposed to facility), and configuration data retention

  19. Test plan for engineering scale electrostatic enclosure demonstration

    International Nuclear Information System (INIS)

    Meyer, L.C.

    1993-02-01

    This test plan describes experimental details of an engineering-scale electrostatic enclosure demonstration to be performed at the Idaho National Engineering Laboratory in fiscal year (FY)-93. This demonstration will investigate, in the engineering scale, the feasibility of using electrostatic enclosures and devices to control the spread of contaminants during transuranic waste handling operations. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the FY-93 experiments are included in this plan

  20. 24 CFR 599.507 - Tax incentives utilization plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Tax incentives utilization plan....507 Tax incentives utilization plan. (a) Preliminary plan. Within six months of designation, the CoRA must prepare and submit to HUD a preliminary tax incentives utilization plan for achieving the State...

  1. LERF Basin 44 Process Test Plan

    International Nuclear Information System (INIS)

    LUECK, K.J.

    1999-01-01

    This document presents a plan to process a portion of the Liquid Effluent Retention Facility (LERF) Basin 44 wastewater through the 200 Area Effluent Treatment Facility (ETF). The objective of this process test is to determine the most effective/efficient method to treat the wastewater currently stored in LERF Basin 44. The process test will determine the operational parameters necessary to comply with facility effluent discharge permit limits (Ecology 1995) and the Environmental Restoration Disposal Facility (ERDF) acceptance criteria (BHI-00139), while achieving ALARA goals and maintaining the integrity of facility equipment. A major focus of the test plan centers on control of contamination due to leaks and/or facility maintenance. As a pre-startup item, all known leaks will be fixed before the start of the test. During the course of the test, a variety of contamination control measures will be evaluated for implementation during the treatment of the remaining Basin 44 inventory. Of special interest will be techniques and tools used to prevent contamination spread during sampling and when opening contaminated facility equipment/piping. At the conclusion of the test, a post ALARA review will be performed to identify lessons learned from the test run which can be applied to the treatment of the remaining Basin 44 inventory. The volume of wastewater to be treated during this test run is 500,000 gallons. This volume limit is necessary to maintain the ETF radiological inventory limits per the approved authorization basis. The duration of the process test is approximately 30 days

  2. Results of the Preliminary Test in the 1/4-Scale RCCS of the PMR200 VHTR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong-Hwan; Bae, Yoon-Yeong; Hong, Sung-Deok; Kim, Chan-Soo; Cho, Bong-Hyun; Kim, Min-Hwan [Nuclear Hydrogen Reactor Technology Development Dep., Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-10-15

    The Reactor Cavity Cooling System (RCCS) is a key ex-vessel passive safety system that will ensure the safety of the PMR200, and its performance needs to be verified. For the difficulty of the full-scale test, a 1/4-scale RCCS facility, NACEF (Natural Cooling Experimental Facility), has been constructed at KAERI, and a shakedown test has been performed. A brief design and the preliminary test results of this facility are described. A 1/4-scale RCCS mockup of PMR200, NACEF, was constructed and tested preliminarily. The functioning of the facility worked quite well. Moreover, the preliminary test results show a fairly good agreement with past work except for the conductive heat transfer region in the riser bottom. After a remedy such as the installation of more precise flow meters and a more improved insulation, the test facility is likely to work well.

  3. Surface-based test plan, Deaf Smith County, Texas Site: Draft

    International Nuclear Information System (INIS)

    1985-01-01

    The Surface-Based Test Plan (SBTP) is the plan which accounts for all surface-based site field work to be conducted at the Permian salt site selected for characterization. The SBTP relates data needs from program requirement documents and presents plans to satisfy the data needs. The SBTP excludes plans for construction of the Exploratory Shaft Facility (ESF) and plans for the in situ testing. The SBTP is a hierarchical plan stemming from the Technical Program Plan. The SBTP describes in detail the process by which surface-based study plans are defined, developed, and controlled. The plans hierarchy extends downward thru subordinate Site Study Plans (SSPs), which describe in detail elements of field work to be done, to detailed Procedures which document the exact methodologies to be employed in the conduct of field work. The plan is a QA level S document, although some of its elements are at lower QA levels. The plan is a controlled document, and any proposed amendments to the plan or subordinate documents can only be implemented through the specified change control procedure

  4. Construction of PREMUX and preliminary experimental results, as preparation for the HCPB breeder unit mock-up testing

    Energy Technology Data Exchange (ETDEWEB)

    Hernández, F., E-mail: francisco.hernandez@kit.edu [Karlsruhe Institute of Technology (KIT), Institute for Neutron Physics and Reactor Technology (INR) (Germany); Kolb, M. [Karlsruhe Institute of Technology (KIT), Institute for Applied Materials (IAM-WPT) (Germany); Annabattula, R. [Indian Institute of Technology Madras (IITM), Department of Mechanical Engineering (India); Weth, A. von der [Karlsruhe Institute of Technology (KIT), Institute for Neutron Physics and Reactor Technology (INR) (Germany)

    2014-10-15

    Highlights: • PREMUX has been constructed as preparation for a future out-of-pile thermo-mechanical qualification of a HCPB breeder unit mock-up. • The rationale and constructive details of PREMUX are reported in this paper. • PREMUX serves as a test rig for the new heater system developed for the HCPB-BU mock-up. • PREMUX will be used as benchmark for the thermal and thermo-mechanical models developed in ANSYS for the pebble beds of the HCPB-BU. • Preliminary results show the functionality of PREMUX and the good agreement of the measured temperatures with the thermal model developed in ANSYS. - Abstract: One of the European blanket designs for ITER is the Helium Cooled Pebble Bed (HCPB) blanket. The core of the HCPB-TBM consists of so-called breeder units (BUs), which encloses beryllium as neutron multiplier and lithium orthosilicate (Li{sub 4}SiO{sub 4}) as tritium breeder in form of pebble beds. After the design phase of the HCPB-BU, a non-nuclear thermal and thermo-mechanical qualification program for this device is running at the Karlsruhe Institute of Technology. Before the complex full scale BU testing, a pre-test mock-up experiment (PREMUX) has been constructed, which consists of a slice of the BU containing the Li{sub 4}SiO{sub 4} pebble bed. PREMUX is going to be operated under highly ITER-relevant conditions and has the following goals: (1) as a testing rig of new heater concept based on a matrix of wire heaters, (2) as benchmark for the existing finite element method (FEM) codes used for the thermo-mechanical assessment of the Li{sub 4}SiO{sub 4} pebble bed, and (3) in situ measurement of thermal conductivity of the Li{sub 4}SiO{sub 4} pebble bed during the tests. This paper describes the construction of PREMUX, its rationale and the experimental campaign planned with the device. Preliminary results testing the algorithm used for the temperature reconstruction of the pebble bed are reported and compared qualitatively with first analyses

  5. Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria

  6. Final turbine and test facility design report Alden/NREC fish friendly turbine

    Energy Technology Data Exchange (ETDEWEB)

    Cook, Thomas C. [Alden Research Lab., Holden, MA (United States); Cain, Stuart A. [Alden Research Lab., Holden, MA (United States); Fetfatsidis, Paul [Alden Research Lab., Holden, MA (United States); Hecker, George E. [Alden Research Lab., Holden, MA (United States); Stacy, Philip S. [Alden Research Lab., Holden, MA (United States)

    2000-09-01

    The final report provides an overview of the Alden/NREC Fish Friendly turbine design phase, turbine test plan, preliminary test results, costs, schedule, and a hypothetical application at a real world project.

  7. Preliminary environmental analysis of a geopressured-geothermal test well in Brazoria County, Texas

    Energy Technology Data Exchange (ETDEWEB)

    White, W.A.; McGraw, M.; Gustavson, T.C.; Meriwether, J.

    1977-11-16

    Preliminary environmental data, including current land use, substrate lithology, soils, natural hazards, water resources, biological assemblages, meteorological data, and regulatory considerations have been collected and analyzed for approximately 150 km/sup 2/ of land near Chocolate Bayou, Brazoria County, Texas, in which a geopressured-geothermal test well is to be drilled in the fall of 1977. The study was designed to establish an environmental data base and to determine, within spatial constraints set by subsurface reservoir conditions, environmentally suitable sites for the proposed well. Preliminary analyses of data revealed the eed for focusing on the following areas: potential for subsidence and fault activation, susceptibility of test well and support facilities to fresh- and salt-water flooding, possible effects of produced saline waters on biological assemblages and groundwaer resources, distribution of expansive soils, and effect of drilling and associated support activities on known archeological-cultural resources.

  8. DER Certification Laboratory Pilot, Accreditation Plan, and Interconnection Agreement Handbook

    Energy Technology Data Exchange (ETDEWEB)

    Key, T.; Sitzlar, H. E.; Ferraro, R.

    2003-11-01

    This report describes the first steps toward creating the organization, procedures, plans and tools for distributed energy resources (DER) equipment certification, test laboratory accreditation, and interconnection agreements. It covers the activities and accomplishments during the first period of a multiyear effort. It summarizes steps taken to outline a certification plan to assist in the future development of an interim plan for certification and accreditation activities. It also summarizes work toward a draft plan for certification, a beta Web site to support communications and materials, and preliminary draft certification criteria.

  9. Geochemical Testing And Model Development - Residual Tank Waste Test Plan

    International Nuclear Information System (INIS)

    Cantrell, K.J.; Connelly, M.P.

    2010-01-01

    This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

  10. Theory and Praxis in Community Based Language Development: preliminary findings from applications of the Guide for Planning the Future of Our Language

    OpenAIRE

    Eberhard David M.

    2017-01-01

    This study will provide a critique of preliminary results obtained from the application of the ‘Guide for Planning the Future of Our Language’ (Hanawalt, Varenkamp, Lahn, & Eberhard 2015) in minority speech communities. This recent methodological tool was developed to enable and empower minoritized language groups to do their own language planning and to control their own language development. The tool is based on a theoretical approach to community based language development known as the ‘Su...

  11. 32 CFR 644.30 - Preliminary real estate work.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Preliminary real estate work. 644.30 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Military (army and Air Force) and Other Federal Agencies § 644.30 Preliminary real estate work. (a) Preliminary real estate work is defined as that action taken...

  12. Test for Nonlinear Input Output Relations in SISO Systems by Preliminary Data Analysis

    DEFF Research Database (Denmark)

    Knudsen, Torben

    2000-01-01

    This paper discusses and develops preliminary statistical tests for detecting nonlinearities in the deterministic part of SISO systems with noise. The most referenced method is unreliable for common noise processes as e.g.\\ colored. Therefore two new methods based on superposition and sinus input...

  13. Preliminary engineering specifications for a test demonstration multilayer protective barrier cover system

    International Nuclear Information System (INIS)

    Phillips, S.J.; Gilbert, T.W.; Adams, M.R.

    1985-03-01

    This report presents preliminary engineering specifications for a test protective barrier cover system and support radiohydrology facility to be constructed at the Hanford Protective Barrier Test Facility (PBTF). Construction of this test barrier and related radiohydrology facility is part of a continuing effort to provide construction experience and performance evaluation of alternative barrier designs used for long-term isolation of disposed radioactive waste materials. Design specifications given in this report are tentative, based on interim engineering and computer simulation design efforts. Final definitive design specifications and engineering prints will be produced in FY 1986. 6 refs., 10 figs., 1 tab

  14. The engineering test facility

    International Nuclear Information System (INIS)

    Steiner, D.; Becraft, W.R.; Sager, P.H.

    1981-01-01

    The vehicle by which the fusion program would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The ETF would provide a test-bed for reactor components in the fusion environment. In order to initiate preliminary planning for the ETF decision, the Office of Fusion Energy established the ETF Design Center activity to prepare the design of the ETF. This paper describes the design status of the ETF. (orig.)

  15. Jet-Surface Interaction: High Aspect Ratio Nozzle Test, Nozzle Design and Preliminary Data

    Science.gov (United States)

    Brown, Clifford; Dippold, Vance

    2015-01-01

    The Jet-Surface Interaction High Aspect Ratio (JSI-HAR) nozzle test is part of an ongoing effort to measure and predict the noise created when an aircraft engine exhausts close to an airframe surface. The JSI-HAR test is focused on parameters derived from the Turbo-electric Distributed Propulsion (TeDP) concept aircraft which include a high-aspect ratio mailslot exhaust nozzle, internal septa, and an aft deck. The size and mass flow rate limits of the test rig also limited the test nozzle to a 16:1 aspect ratio, half the approximately 32:1 on the TeDP concept. Also, unlike the aircraft, the test nozzle must transition from a single round duct on the High Flow Jet Exit Rig, located in the AeroAcoustic Propulsion Laboratory at the NASA Glenn Research Center, to the rectangular shape at the nozzle exit. A parametric nozzle design method was developed to design three low noise round-to-rectangular transitions, with 8:1, 12:1, and 16: aspect ratios, that minimizes flow separations and shocks while providing a flat flow profile at the nozzle exit. These designs validated using the WIND-US CFD code. A preliminary analysis of the test data shows that the actual flow profile is close to that predicted and that the noise results appear consistent with data from previous, smaller scale, tests. The JSI-HAR test is ongoing through October 2015. The results shown in the presentation are intended to provide an overview of the test and a first look at the preliminary results.

  16. Light Duty Utility Arm Software Test Plan

    International Nuclear Information System (INIS)

    Kiebel, G.R.

    1995-01-01

    This plan describes how validation testing of the software will be implemented for the integrated control and data acquisition system of the Light Duty Utility Arm System (LDUA). The purpose of LDUA software validation testing is to demonstrate and document that the LDUA software meets its software requirements specification

  17. INEL test plan for evaluating waste assay systems

    International Nuclear Information System (INIS)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP

  18. In situ vitrification laboratory-scale test work plan

    International Nuclear Information System (INIS)

    Nagata, P.K.; Smith, N.L.

    1991-05-01

    The Buried Waste Program was established in October 1987 to accelerate the studies needed to develop a long-term management plan for the buried mixed waste at the Radioactive Waste Management Complex at Idaho Engineering Laboratory. The In Situ Vitrification Project is being conducted in a Comprehensive Environmental Response, Compensation, and Liability Act feasibility study format to identify methods for the long-term management of mixed buried waste. To support the overall feasibility study, the situ vitrification treatability investigations are proceeding along the three parallel paths: laboratory-scale tests, intermediate field tests, and field tests. Laboratory-scale tests are being performed to provide data to mathematical modeling efforts, which, in turn, will support design of the field tests and to the health and safety risk assessment. This laboratory-scale test work plan provides overall testing program direction to meet the current goals and objectives of the in situ vitrification treatability investigation. 12 refs., 1 fig., 7 tabs

  19. INEL test plan for evaluating waste assay systems

    Energy Technology Data Exchange (ETDEWEB)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP.

  20. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  1. Plutonium Immobilization Can Loading Preliminary Specifications

    Energy Technology Data Exchange (ETDEWEB)

    Kriikku, E.

    1998-11-25

    This report discusses the Plutonium Immobilization can loading preliminary equipment specifications and includes a process block diagram, process description, equipment list, preliminary equipment specifications, plan and elevation sketches, and some commercial catalogs. This report identifies loading pucks into cans and backfilling cans with helium as the top priority can loading development areas.

  2. Accelerated stress testing of thin film solar cells: Development of test methods and preliminary results

    Science.gov (United States)

    Lathrop, J. W.

    1985-01-01

    If thin film cells are to be considered a viable option for terrestrial power generation their reliability attributes will need to be explored and confidence in their stability obtained through accelerated testing. Development of a thin film accelerated test program will be more difficult than was the case for crystalline cells because of the monolithic construction nature of the cells. Specially constructed test samples will need to be fabricated, requiring committment to the concept of accelerated testing by the manufacturers. A new test schedule appropriate to thin film cells will need to be developed which will be different from that used in connection with crystalline cells. Preliminary work has been started to seek thin film schedule variations to two of the simplest tests: unbiased temperature and unbiased temperature humidity. Still to be examined are tests which involve the passage of current during temperature and/or humidity stress, either by biasing in the forward (or reverse) directions or by the application of light during stress. Investigation of these current (voltage) accelerated tests will involve development of methods of reliably contacting the thin conductive films during stress.

  3. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results

    International Nuclear Information System (INIS)

    Turcotte, R.; Fortin, L.G.; Pugin, S.; Cyr, J.F.; Picard, F.; Poirier, C.; Lacombe, P.

    2004-01-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs

  4. Preliminary Beam Irradiation Test for RI Production Targets at KOMAC

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Sang Pil; Kwon, Hyeok Jung; Kim, Han Sung; Cho, Yong Sub; Seol, Kyung Tae; Song, Young Gi; Kim, Dae Il; Jung, Myung Hwan; Kim, Kye Ryung; Min, Yi Sub [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The new beamline and target irradiation facility has been constructed for the production of therapeutic radio-isotope. Sr-82 and Cu-67 were selected as the target isotope in this facility, they are promising isotope for the PET imaging and cancer therapy. For the facility commissioning, the irradiation test for the prototype-target was conducted to confirm the feasibility of radio-isotope production, the proto-type targets are made of RbCl pellet and the natural Zn metal for Sr-82 and Cu-67 production respectively, In this paper, an introduction to the RI production targetry system and the results of the preliminary beam irradiation test are discussed. the low-flux beam irradiation tests for proto-type RI target have been conducted. As a result of the beam irradiation tests, we could obtain the evidence of Sr-82 and Cu-67 production, have confirmed the feasibility of Sr-82 and Cu-67 production at KOMAC RI production facility.

  5. Preliminary Beam Irradiation Test for RI Production Targets at KOMAC

    International Nuclear Information System (INIS)

    Yoon, Sang Pil; Kwon, Hyeok Jung; Kim, Han Sung; Cho, Yong Sub; Seol, Kyung Tae; Song, Young Gi; Kim, Dae Il; Jung, Myung Hwan; Kim, Kye Ryung; Min, Yi Sub

    2016-01-01

    The new beamline and target irradiation facility has been constructed for the production of therapeutic radio-isotope. Sr-82 and Cu-67 were selected as the target isotope in this facility, they are promising isotope for the PET imaging and cancer therapy. For the facility commissioning, the irradiation test for the prototype-target was conducted to confirm the feasibility of radio-isotope production, the proto-type targets are made of RbCl pellet and the natural Zn metal for Sr-82 and Cu-67 production respectively, In this paper, an introduction to the RI production targetry system and the results of the preliminary beam irradiation test are discussed. the low-flux beam irradiation tests for proto-type RI target have been conducted. As a result of the beam irradiation tests, we could obtain the evidence of Sr-82 and Cu-67 production, have confirmed the feasibility of Sr-82 and Cu-67 production at KOMAC RI production facility

  6. The Art Gallery Test: A Preliminary Comparison between Traditional Neuropsychological and Ecological VR-Based Tests

    Directory of Open Access Journals (Sweden)

    Pedro Gamito

    2017-11-01

    Full Text Available Ecological validity should be the cornerstone of any assessment of cognitive functioning. For this purpose, we have developed a preliminary study to test the Art Gallery Test (AGT as an alternative to traditional neuropsychological testing. The AGT involves three visual search subtests displayed in a virtual reality (VR art gallery, designed to assess visual attention within an ecologically valid setting. To evaluate the relation between AGT and standard neuropsychological assessment scales, data were collected on a normative sample of healthy adults (n = 30. The measures consisted of concurrent paper-and-pencil neuropsychological measures [Montreal Cognitive Assessment (MoCA, Frontal Assessment Battery (FAB, and Color Trails Test (CTT] along with the outcomes from the three subtests of the AGT. The results showed significant correlations between the AGT subtests describing different visual search exercises strategies with global and specific cognitive measures. Comparative visual search was associated with attention and cognitive flexibility (CTT; whereas visual searches involving pictograms correlated with global cognitive function (MoCA.

  7. Engineering test facility design center

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The vehicle by which the fusion program would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The ETF would provide a test bed for reactor components in the fusion environment. In order to initiate preliminary planning for the ETF decision, the Office of Fusion Energy established the ETF Design Center activity to prepare the design of the ETF. This section describes the status of this design

  8. A Preliminary Analysis of Reactor Performance Test (LOEP) for a Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyeonil; Park, Su-Ki [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    The final phase of commissioning is reactor performance test, which is to prove the integrated performance and safety of the research reactor at full power with fuel loaded such as neutron power calibration, Control Absorber Rod/Second Shutdown Rod drop time, InC function test, Criticality, Rod worth, Core heat removal with natural mechanism, and so forth. The last test will be safety-related one to assure the result of the safety analysis of the research reactor is marginal enough to be sure about the nuclear safety by showing the reactor satisfies the acceptance criteria of the safety functions such as for reactivity control, maintenance of auxiliaries, reactor pool water inventory control, core heat removal, and confinement isolation. After all, the fuel integrity will be ensured by verifying there is no meaningful change in the radiation levels. To confirm the performance of safety equipment, loss of normal electric power (LOEP), possibly categorized as Anticipated Operational Occurrence (AOO), is selected as a key experiment to figure out how safe the research reactor is before turning over the research reactor to the owner. This paper presents a preliminary analysis of the reactor performance test (LOEP) for a research reactor. The results showed how different the transient between conservative estimate and best estimate will look. Preliminary analyses have shown all probable thermal-hydraulic transient behavior of importance as to opening of flap valve, minimum critical heat flux ratio, the change of flow direction, and important values of thermal-hydraulic parameters.

  9. Results and future plans for the innovative basic research on high temperature engineering

    International Nuclear Information System (INIS)

    2001-05-01

    The High Temperature Engineering Test Reactor (HTTR) is under the rise-to-power stage at the Oarai Research Establishment of Japan Atomic Energy Research Institute (JAERI). This reactor is aimed not only at establishment of the infrastructural technology on high temperature gas-cooled reactor and its upgrading, but also at promotion of the innovative basic research on high temperature engineering. The research is a series of innovative high-temperature irradiation studies, making the best use of the characteristic of the HTTR that it provides a very wide irradiation space at high temperatures. The JAERI has been conducting preliminary tests of the innovative research since 1994, in collaboration with universities and other research institutes, in the fields of 1) new materials development, 2) high temperature radiation chemistry and fusion-related research, and 3) high temperature irradiation techniques and other nuclear research. The HTTR Utilization Research Committee has been examining the results and methodology of the preliminary tests and the future plans, as well as examining the preparatory arrangements of facilities for the HTTR irradiation and post-irradiation examinations. This report presents a summary of results of the preliminary tests and preparatory arrangements for about seven years, together with an outline of the future plans. (author)

  10. NASA's Plan for SDLS Testing

    Science.gov (United States)

    Bailey, Brandon

    2015-01-01

    The Space Data Link Security (SDLS) Protocol is a Consultative Committee for Space Data Systems (CCSDS) standard which extends the known Data Link protocols to secure data being sent over a space link by providing confidentiality and integrity services. This plan outlines the approach by National Aeronautics Space Administration (NASA) in performing testing of the SDLS protocol using a prototype based on an existing NASA missions simulator.

  11. Evaluation of the preliminary auditory profile test battery in an international multi-centre study

    NARCIS (Netherlands)

    van Esch, T.E.M.; Kollmeier, B.; Vormann, M.; Lijzenga, J.; Houtgast, T.; Hallgren, M.; Larsby, B.; Athalye, S.P.; Lutman, M.E.; Dreschler, W.A.

    2013-01-01

    Objective: This paper describes the composition and international multi-centre evaluation of a battery of tests termed the preliminary auditory profile. It includes measures of loudness perception, listening effort, speech perception, spectral and temporal resolution, spatial hearing, self-reported

  12. 100 Area excavation treatability test plan

    International Nuclear Information System (INIS)

    1993-08-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992f). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications. The most recent applications are excavation of the 618-9 burial ground and partial remediation of the 316-5 process trenches (DOE-RL 1992a, 1992b). Both projects included excavation of soil and dust control (using water sprays). Excavation is a well-developed technology and equipment is readily available; however, certain aspects of the excavation process require testing before use in full-scale operations. These include the following: Measurement and control of excavation-generated dust and airborne contamination; verification of field analytical system capabilities; demonstration of soil removal techniques specific to the 100 Area waste site types and configurations. The execution of this treatability test may produce up to 500 yd 3 of contaminated soil, which will be used for future treatability tests. These tests may include soil washing with vitrification of the soil washing residuals. Other tests will be conducted if soil washing is not a viable alternative

  13. Standard review plan for the review and evaluation of emergency plans for research and test reactors

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides a Standard Review Plan to assure that complete and uniform reviews are made of research and test reactor radiological emergency plans. The report is organized under ten planning standards which correspond to the guidance criteria in American National Standard ANSI/ANS 15.16 - 1982 as endorsed by Revision 1 to Regulatory Guide 2.6. The applicability of the items under each planning standard is indicated by subdivisions of the steady-state thermal power levels at which the reactors are licensed to operate. Standard emergency classes and example action levels for research and test reactors which should initiate these classes are given in an Appendix. The content of the emergency plan is as follows: the emergency plan addresses the necessary provisions for coping with radiological emergencies. Activation of the emergency plan is in response to the emergency action levels. In addition to addressing those severe emergencies that will fall within one of the standard emergency classes, the plan also discusses the necessary provisions to deal with radiological emergencies of lesser severity that can occur within the operations boundary. The emergency plan allows for emergency personnel to deviate from actions described in the plan for unusual or unanticipated conditions

  14. Influence of mechanical stress level in preliminary stress-corrosion testing on fatigue strength of a low-carbon steel

    International Nuclear Information System (INIS)

    Aleskerova, S.A.; Pakharyan, V.A.

    1978-01-01

    Effect of corrosion and mechanical factors of preliminary stress corrosion of a metal in its fatigue strength, has been investigated. Smooth cylindrical samples of 20 steel have been tested. Preliminary corrosion under stress has been carried out under natural sea conditions. It is shown that mechanical stresses in the case of preliminary corrosion affect fatigue strength of low-carbon steels, decreasing the range of limited durability and fatigue limit. This effect increases with the increase of stress level and agressivity of corrosive medium

  15. Preliminary report on fire protection research program (July 6, 1977 test)

    International Nuclear Information System (INIS)

    Klamerus, L.J.

    1977-10-01

    This preliminary report describes a fire test performed at Sandia Laboratories on an array of cable trays filled with fire retardant (IEEE 383 qualified) electrical cable. The cable trays were arranged in an open-space horizontal configuration with the separation distances of Regulatory Guide 1.75 between those trays representing redundant safety divisions. Propane burners were used to produce a fully developed cable fire in one tray which then was allowed to interact with other trays. From this test it appears that it is possible for a fire to propagate across the vertical separation distance between safety divisions, if a fully developed cable fire is the initiating event

  16. Preliminary AD-Horn Thermomechanical and Electrodynamic Simulations

    CERN Document Server

    AUTHOR|(CDS)2095747; Horvath, David; Calviani, Marco

    2016-01-01

    As part of the Antiproton Decelerator (AD) target area consolidation activities planned for LS2, it has been necessary to perform a comprehensive study of the thermo-structural behaviour of the AD magnetic horn during operation, in order to detail specific requirements for the upgrade projects and testing procedures. The present work illustrates the preliminary results of the finite element analysis carried out to evaluate the thermal and structural behaviour of the device, as well as the methodology used to model and solve the thermomechanical and electrodynamic simulations performed in the AD magnetic horn.

  17. Tests to Help Plan Opportunity Moves

    Science.gov (United States)

    2005-01-01

    Rover engineers check how a test rover moves in material chosen to simulate some difficult Mars driving conditions. The scene is inside the In-Situ Instrument Laboratory at NASA's Jet Propulsion Laboratory, Pasadena, Calif. These tests in early May 2005 were designed to help plan the best way for the rover Opportunity to drive off of a soft-sand dune that the rover dug itself into the previous week. The mixture of sandy and powdery material brought in for these specific tests matched the way the soil underneath Opportunity caked onto wheels, filling the spaces between the cleats on the wheels.

  18. Preliminary Design of a LSA Aircraft Using Wind Tunnel Tests

    Directory of Open Access Journals (Sweden)

    Norbert ANGI

    2015-12-01

    Full Text Available This paper presents preliminary results concerning the design and aerodynamic calculations of a light sport aircraft (LSA. These were performed for a new lightweight, low cost, low fuel consumption and long-range aircraft. The design process was based on specific software tools as Advanced Aircraft Analysis (AAA, XFlr 5 aerodynamic and dynamic stability analysis, and Catia design, according to CS-LSA requirements. The calculations were accomplished by a series of tests performed in the wind tunnel in order to assess experimentally the aerodynamic characteristics of the airplane.

  19. Preliminary Cost Model for Space Telescopes

    Science.gov (United States)

    Stahl, H. Philip; Prince, F. Andrew; Smart, Christian; Stephens, Kyle; Henrichs, Todd

    2009-01-01

    Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. However, great care is required. Some space telescope cost models, such as those based only on mass, lack sufficient detail to support such analysis and may lead to inaccurate conclusions. Similarly, using ground based telescope models which include the dome cost will also lead to inaccurate conclusions. This paper reviews current and historical models. Then, based on data from 22 different NASA space telescopes, this paper tests those models and presents preliminary analysis of single and multi-variable space telescope cost models.

  20. Preliminary Failure Modes and Effects Analysis of the US DCLL Test Blanket Module

    Energy Technology Data Exchange (ETDEWEB)

    Lee C. Cadwallader

    2010-06-01

    This report presents the results of a preliminary failure modes and effects analysis (FMEA) of a small tritium-breeding test blanket module design for the International Thermonuclear Experimental Reactor. The FMEA was quantified with “generic” component failure rate data, and the failure events are binned into postulated initiating event families and frequency categories for safety assessment. An appendix to this report contains repair time data to support an occupational radiation exposure assessment for test blanket module maintenance.

  1. Preliminary Failure Modes and Effects Analysis of the US DCLL Test Blanket Module

    Energy Technology Data Exchange (ETDEWEB)

    Lee C. Cadwallader

    2007-08-01

    This report presents the results of a preliminary failure modes and effects analysis (FMEA) of a small tritium-breeding test blanket module design for the International Thermonuclear Experimental Reactor. The FMEA was quantified with “generic” component failure rate data, and the failure events are binned into postulated initiating event families and frequency categories for safety assessment. An appendix to this report contains repair time data to support an occupational radiation exposure assessment for test blanket module maintenance.

  2. Preliminary Failure Modes and Effects Analysis of the US DCLL Test Blanket Module

    International Nuclear Information System (INIS)

    Lee C. Cadwallader

    2007-01-01

    This report presents the results of a preliminary failure modes and effects analysis (FMEA) of a small tritium-breeding test blanket module design for the International Thermonuclear Experimental Reactor. The FMEA was quantified with 'generic' component failure rate data, and the failure events are binned into postulated initiating event families and frequency categories for safety assessment. An appendix to this report contains repair time data to support an occupational radiation exposure assessment for test blanket module maintenance

  3. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  4. AGC-1 Experiment and Final Preliminary Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Robert L. Bratton; Tim Burchell

    2006-08-01

    This report details the experimental plan and design as of the preliminary design review for the Advanced Test Reactor Graphite Creep-1 graphite compressive creep capsule. The capsule will contain five graphite grades that will be irradiated in the Advanced Test Reactor at the Idaho National Laboratory to determine the irradiation induced creep constants. Seven other grades of graphite will be irradiated to determine irradiated physical properties. The capsule will have an irradiation temperature of 900 C and a peak irradiation dose of 5.8 x 10{sup 21} n/cm{sup 2} [E > 0.1 MeV], or 4.2 displacements per atom.

  5. Preliminary tests of holography in BEBC

    International Nuclear Information System (INIS)

    Pouyat, F.

    1982-01-01

    A collaboration has been set-up between the Institut de Recherche in St. Louis (ISL), the Rutherford Appleton Laboratory (RAL), and the BEBC Group at CERN to study possibilities for application of holographic techniques in BEBC. Laboratory tests and a first trial in BEBC have shown that holograms can be recorded with a two-beam set-up adapted to the optics system of the chamber. The object beam passing through the fish-eye windows illuminates the chamber; after reflection from the Scotchlite panel at the bottom of BEBC it falls through a large-aperture lens onto the film plane. The reference beam is projected directly onto the holographic film plane without passing through the chamber liquid. First results are presented on the influence of the BEBC magnetic field, vibrations of the BEBC expansion system, and on the limitations on resolution to be expected. An outlook is given of future plans for trying to feed a test program on holography into the physics program of the chamber. (orig.)

  6. Secondary Waste Cast Stone Waste Form Qualification Testing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Westsik, Joseph H.; Serne, R. Jeffrey

    2012-09-26

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptable for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF

  7. Preliminary results of hydrologic testing: The composite Umtanum basalt flow top at borehole RRL-2 (3,568 - 3,781 feet)

    International Nuclear Information System (INIS)

    Strait, S.R.; Spane, F.A. Jr.

    1982-11-01

    This report presents preliminary results and description of hydrologic test activities for the composite Umtanum basalt flow top (3,568--3,781 feet) at Borehole RRL-2. Hydrologic tests conducted include two constant discharge air-lift and four slug tests. Preliminary results indicate an observed hydraulic head for the test interval of 405.7 feet above mean sea level. Transmissivity values determined from hydrologic tests performed, range between 244 to 481 ft 2 /day, with an assigned best estimate of 480 ft 2 /day. The best estimate of equivalent hydraulic conductivity, based on an effective test thickness of 157 feet, is 3.1 ft/day. 7 refs., 9 figs., 3 tabs

  8. Single Event Effects (SEE) Testing: Practical Approach to Test Plans

    Science.gov (United States)

    LaBel, Kenneth A.; Pellish, Jonathan Allen; Berg, Melanie D.

    2014-01-01

    While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: we consider the approach outlined here as a "living" document: Mission-specific constraints and new technology related issues always need to be taken into account.

  9. A Preliminary Assessment of Daily Weather Conditions in Nuclear Site for Development of Effective Emergency Plan

    International Nuclear Information System (INIS)

    Han, Seok Jung; Ahn, Kwang Il

    2012-01-01

    A radiological emergency preparedness for nuclear sites is recognized as an important measure against anticipated severe accidents with environmental releases of radioactive materials. While there are many individual means in the emergency preparedness for nuclear accidents, one of most important means is to make a decision of evacuation or shelter of the public residents with the emergency plan zone (EPZ) of a nuclear site. In order to prepare an effective strategy for the evacuation as a basis of the emergency preparedness, it may need the understanding of atmospheric dispersion characteristics of radiation releases to the environment, mainly depending upon the weather conditions of a radiation releases location, i.e., a nuclear site. As a preliminary study for the development of an effective emergency plan, the basic features of the weather conditions of a specific site were investigated. A main interest of this study is to identify whether or not the site weather conditions have specific features helpful for a decision making of evacuation of the public residents

  10. Partitioning planning studies: Preliminary evaluation of metal and radionuclide partitioning the high-temperature thermal treatment systems

    International Nuclear Information System (INIS)

    Liekhus, K.; Grandy, J.; Chambers, A.

    1997-03-01

    A preliminary study of toxic metals and radionuclide partitioning during high-temperature processing of mixed waste has been conducted during Fiscal Year 1996 within the Environmental Management Technology Evaluation Project. The study included: (a) identification of relevant partitioning mechanisms that cause feed material to be distributed between the solid, molten, and gas phases within a thermal treatment system; (b) evaluations of existing test data from applicable demonstration test programs as a means to identify and understand elemental and species partitioning; and, (c) evaluation of theoretical or empirical partitioning models for use in predicting elemental or species partitioning in a thermal treatment system. This preliminary study was conducted to identify the need for and the viability of developing the tools capable of describing and predicting toxic metals and radionuclide partitioning in the most applicable mixed waste thermal treatment processes. This document presents the results and recommendations resulting from this study that may serve as an impetus for developing and implementing these predictive tools

  11. Partitioning planning studies: Preliminary evaluation of metal and radionuclide partitioning the high-temperature thermal treatment systems

    Energy Technology Data Exchange (ETDEWEB)

    Liekhus, K.; Grandy, J.; Chambers, A. [and others

    1997-03-01

    A preliminary study of toxic metals and radionuclide partitioning during high-temperature processing of mixed waste has been conducted during Fiscal Year 1996 within the Environmental Management Technology Evaluation Project. The study included: (a) identification of relevant partitioning mechanisms that cause feed material to be distributed between the solid, molten, and gas phases within a thermal treatment system; (b) evaluations of existing test data from applicable demonstration test programs as a means to identify and understand elemental and species partitioning; and, (c) evaluation of theoretical or empirical partitioning models for use in predicting elemental or species partitioning in a thermal treatment system. This preliminary study was conducted to identify the need for and the viability of developing the tools capable of describing and predicting toxic metals and radionuclide partitioning in the most applicable mixed waste thermal treatment processes. This document presents the results and recommendations resulting from this study that may serve as an impetus for developing and implementing these predictive tools.

  12. Test plan guidance for transuranic-contaminated arid landfill remedial technology development

    International Nuclear Information System (INIS)

    Evans, J.; Shaw, P.

    1995-05-01

    This document provides guidance for preparing plans to test or demonstrate buried waste assessment or remediation technologies supported by the U.S. Department of Energy's Landfill Stabilization Focus Area, Transuranic-Contaminated Arid Landfill Product Line. This document also provides guidance for development of data quality objectives, along with the necessary data to meet the project objectives. The purpose is to ensure that useful data of known quality are collected to support conclusions associated with the designated demonstration or test. A properly prepared test plan will integrate specific and appropriate objectives with needed measurements to ensure data will reflect the Department of Energy Office of Technology Development's mission, be consistent with Landfill Stabilization Focus Area test goals, and be useful for the Department of Energy Environmental Restoration and Waste Management programs and other potential partners (e.g., commercial concerns). The test plan becomes the planning and working document for the demonstration or test to be conducted ensuring procedures are followed that will allow data of sufficient quality to be collected for comparison and evaluation

  13. Preliminary analysis of accelerated space flight ionizing radiation testing

    Science.gov (United States)

    Wilson, J. W.; Stock, L. V.; Carter, D. J.; Chang, C. K.

    1982-01-01

    A preliminary analysis shows that radiation dose equivalent to 30 years in the geosynchronous environment can be accumulated in a typical composite material exposed to space for 2 years or less onboard a spacecraft orbiting from perigee of 300 km out to the peak of the inner electron belt (approximately 2750 km). Future work to determine spacecraft orbits better tailored to materials accelerated testing is indicated. It is predicted that a range of 10 to the 9th power to 10 to the 10th power rads would be accumulated in 3-6 mil thick epoxy/graphite exposed by a test spacecraft orbiting in the inner electron belt. This dose is equivalent to the accumulated dose that this material would be expected to have after 30 years in a geosynchronous orbit. It is anticipated that material specimens would be brought back to Earth after 2 years in the radiation environment so that space radiation effects on materials could be analyzed by laboratory methods.

  14. Treatability Test Plan for an In Situ Biostimulation Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.; Brockman, Fred J.; Oostrom, Mart; Hubbard, Susan; Borden, Robert C.; Fruchter, Jonathan S.

    2007-07-21

    This treatability test plan supports a new, integrated strategy to accelerate cleanup of chromium in the Hanford 100 Areas. This plan includes performing a field-scale treatability test for bioreduction of chromate, nitrate, and dissolved oxygen. In addition to remediating a portion of the plume and demonstrating reduction of electron acceptors in the plume, the data from this test will be valuable for designing a full-scale bioremediation system to apply at this and other chromium plumes at Hanford.

  15. Preliminary results of hydrologic testing of the Umtanum Basalt Fracture Zone at borehole RRL-2 (3,781 to 3,827 ft)

    International Nuclear Information System (INIS)

    Strait, S.R.; Spane, F.A. Jr.

    1983-02-01

    This report presents preliminary results and description of hydrologic test activities for the Umtanum Basalt Fracture Zone at Borehole RRL-2, within the test interval 3,781 to 3,827 feet. Hydrologic tests conducted include two short-term, constant discharge pumping tests and two slug tests. Preliminary results indicate an observed hydraulic head for the test interval of 406.7 feet above mean sea level. Transmissivity values determined from hydrologic tests performed range between 205 and 881 ft 2 /day. The best estimate of equivalent hydraulic conductivity, based on an effective test thickness of 6 feet, is 147 ft/day. 8 refs., 6 figs., 3 tabs

  16. Cyclonic valve test: preliminary results

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Andre Sampaio; Moraes, Carlos Alberto C.; Marins, Luiz Philipe M.; Soares, Fabricio; Oliveira, Dennis; Lima, Fabio Soares de; Airao, Vinicius [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Ton, Tijmen [Twister BV, Rijswijk (Netherlands)

    2012-07-01

    For many years, the petroleum industry has been developing a valve that input less shear to the flow for a given required pressure drop and this can be done using the cyclonic concept. This paper presents a comparison between the performances of a cyclonic valve (low shear) and a conventional globe valve. The aim of this work is to show the advantages of using a cyclonic low shear valve instead of the commonly used in the primary separation process by PETROBRAS. Tests were performed at PETROBRAS Experimental Center (NUEX) in Aracaju/SE varying some parameters: water cut; pressure loss (from 4 kgf/cm2 to 10 kgf/cm2); flow rates (30 m3/h and 45 m3/h). Results indicates a better performance of the cyclonic valve, if compared with a conventional one, and also that the difference of the performance, is a function of several parameters (emulsion stability, water content free, and oil properties). The cyclonic valve tested can be applied as a choke valve, as a valve between separation stages (for pressure drop), or for controlling the level of vessels. We must emphasize the importance to avoid the high shear imposed by conventional valves, because once the emulsion is created, it becomes more difficult to break it. New tests are being planned to occur in 2012, but PETROBRAS is also analyzing real cases where the applications could increase the primary process efficiency. In the same way, the future installations are also being designed considering the cyclonic valve usage. (author)

  17. Field test plan: Buried waste technologies, Fiscal Year 1995

    International Nuclear Information System (INIS)

    Heard, R.E.; Hyde, R.A.; Engleman, V.S.; Evans, J.D.; Jackson, T.W.

    1995-06-01

    The US Department of Energy, Office of Technology Development, supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that, when integrated with commercially available baseline technologies, form a comprehensive remediation system for the effective and efficient remediation of buried waste. The Fiscal Year 1995 effort is to deploy and test multiple technologies from four functional areas of buried waste remediation: site characterization, waste characterization, retrieval, and treatment. This document is the basic operational planning document for the deployment and testing of the technologies that support the field testing in Fiscal Year 1995. Discussed in this document are the scope of the tests; purpose and objective of the tests; organization and responsibilities; contingency plans; sequence of activities; sampling and data collection; document control; analytical methods; data reduction, validation, and verification; quality assurance; equipment and instruments; facilities and utilities; health and safety; residuals management; and regulatory management

  18. Hanford Waste Vitrification Plant: Preliminary description of waste form and canister

    International Nuclear Information System (INIS)

    Mitchell, D.E.

    1986-01-01

    In July 1985, the US Department of Energy's Office of Civilian Radioactive Waste Management established the Waste Acceptance Process as the means by which defense high-level waste producers, such as the Hanford Waste Vitrification Plant, will develop waste acceptance requirements with the candidate geologic repositories. A complete description of the Waste Acceptance Process is contained in the Preliminary Hanford Waste Vitrification Plant Waste Form Qualification Plan. The Waste Acceptance Process defines three documents that high-level waste producers must prepare as a part of the process of assuming that a high-level waste product will be acceptable for disposal in a geologic repository. These documents are the Description of Waste Form and Canister, Waste Compliance Plan, and Waste Qualification Report. This document is the Hanford Waste Vitrification Plant Preliminary Description of Waste Form and Canister for disposal of Neutralized Current Acid Waste. The Waste Acceptance Specifications for the Hanford Waste Vitrification Plant have not yet been developed, therefore, this document has been structured to corresponds to the Waste Acceptance Preliminary Specifications for the Defense Waste Processing Facility High-Level Waste Form. Not all of the information required by these specifications is appropriate for inclusion in this Preliminary Description of Waste Form and Canister. Rather, this description is limited to information that describes the physical and chemical characteristics of the expected high-level waste form. The content of the document covers three major areas: waste form characteristics, canister characteristics, and canistered waste form characteristics. This information will be used by the candidate geologic repository projects as the basis for preliminary repository design activities and waste form testing. Periodic revisions are expected as the Waste Acceptance Process progresses

  19. Overview of planning process at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The planning process at the Fast Flux Test Facility (FFTF) is controlled through a hierarchy of documents ranging from a ten-year strategic plan to a weekly schedule. Within the hierarchy are a Near-Term (three-year) Operating Plan, a Cycle (six-month) Plan, and an Outage/Operating Phase Schedule. Coordination of the planning process is accomplished by a dedicated preparation team that also provides an overview of the formal planning timetable which identifies key action items required to be completed before an outage/operating phase can begin

  20. Visual Assessment on Coastal Cruise Tourism: A Preliminary Planning Using Importance Performance Analysis

    Science.gov (United States)

    Trisutomo, S.

    2017-07-01

    Importance-Performance Analysis (IPA) has been widely applied in many cases. In this research, IPA was applied to measure perceive on coastal tourism objects and its possibility to be developed as coastal cruise tourism in Makassar. Three objects, i.e. Akkarena recreational site, Losari public space at waterfront, and Paotere traditional Phinisi ships port, were selected and assessed visually from water area by a group of purposive resource persons. The importance and performance of 10 attributes of each site were scored using Likert scale from 1 to 5. Data were processed by SPSS-21 than resulted Cartesian graph which the scores were divided in four quadrants: Quadrant I concentric here, Quadrant II keep up the good work, Quadrant III low priority, and Quadrant IV possible overkill. The attributes in each quadrant could be considered as the platform for preliminary planning of coastal cruise tour in Makassar

  1. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  2. Treatability Test Plan for an In Situ Biostimulation Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.; Brockman, Fred J.; Oostrom, Mart; Hubbard, Susan; Borden, Robert C.; Fruchter, Jonathan S.

    2007-10-26

    This treatability test plan supports a new, integrated strategy to accelerate cleanup of chromium in the 100 Areas at the Hanford Site. This plan includes performing a field-scale treatability test for bioreduction of chromate, nitrate, and dissolved oxygen. In addition to remediating a portion of the plume and demonstrating reduction of electron acceptors in the plume, the data from this test will be valuable for designing a full-scale bioremediation system to apply at this and other chromium plumes at the Hanford Site.

  3. Comprehensive development plans for the low- and intermediate-level radioactive waste disposal facility in Korea and preliminary safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Kang Il; Kim, Jin Hyeong; Kwon, Mi Jin; Jeong, Mi Seon; Hong, Sung Wook; Park, Jin Beak [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of)

    2016-12-15

    The disposal facility in Gyeongju is planning to dispose of 800,000 packages of low- and intermediate- level radioactive waste. This facility will be developed as a complex disposal facility that has various types of disposal facilities and accompanying management. In this study, based on the comprehensive development plan of the disposal facility, a preliminary post-closure safety assessment is performed to predict the phase development of the total capacity for the 800,000 packages to be disposed of at the site. The results for each scenario meet the performance target of the disposal facility. The assessment revealed that there is a significant impact of the inventory of intermediate-level radionuclide waste on the safety evaluation. Due to this finding, we introduce a disposal limit value for intermediate-level radioactive waste. With stepwise development of safety case, this development plan will increase the safety of disposal facilities by reducing uncertainties within the future development of the underground silo disposal facilities.

  4. Test plan for Series 2 spent fuel cladding containment credit tests

    International Nuclear Information System (INIS)

    Wilson, C.N.

    1984-10-01

    This test plan describes a second series of tests to be conducted by Westinghouse Hanford Company (WHC) to evaluate the effectiveness of breached cladding as a barrier to radionuclide release in the NNWSI-proposed geologic repository. These tests will be conducted at the Hanford Engineering Development Laboratory (HEDL). A first series of tests, initiated at HEDL during FY 1983, demonstrated specimen preparation and feasibility of the testing concept. The second series tests will be similar to the Series 1 tests with the following exceptions: NNWSI reference groundwater obtained from well J-13 will be used as the leachant instead of deionized water; fuel from a second source will be used; and certain refinements will be made in specimen preparation, sampling, and analytical procedures. 12 references, 5 figures, 5 tables

  5. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  6. Integrated test plan for directional boring

    International Nuclear Information System (INIS)

    Volk, B.W.

    1993-01-01

    This integrated test plan describes the field testing of the DITCH WITCH Directional Boring System. DITCH WITCH is a registered trademark of The Charles Machine Works, Inc., Perry, Oklahoma. The test is being conducted as a coordinated effort between Charles Machine Works (CMW), Sandia National Laboratories (SNL), and the Westinghouse Hanford Company (WHC). Funding for the WHC portion of the project is through the Volatile Organic Compound-Arid Integrated Demonstration (VOC-Arid ID). The purpose of the test is to evaluate the performance of the directional boring system for possible future use on environmental restoration projects at Hanford and other Department of Energy (DOE) sites. The test will be conducted near the 200 Areas Fire Station located between the 200 East and 200 West Area of the Hanford Site. The directional boring system will be used to drill and complete (with fiberglass casing) two horizontal boreholes. A third borehole will be drilled to test sampling equipment but will not be completed with casing

  7. Standard Ship Test and Inspection Plan, Procedures and Database

    National Research Council Canada - National Science Library

    1999-01-01

    ... construction schedules and increased cost is the area of test and inspection. This project investigates existing rules and regulations for testing and inspection of commercial ships and identifies differences and similarities within the requirements. The results include comparison matrices, a standard test plan, a set of standard test procedures, and a sample test database developed for a typical commercial ship.

  8. Verifying seismic design of nuclear reactors by testing. Volume 1: test plan

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-20

    This document sets forth recommendations for a verification program to test the ability of operational nuclear power plants to achieve safe shutdown immediately following a safe-shutdown earthquake. The purpose of the study is to develop a program plan to provide assurance by physical demonstration that nuclear power plants are earthquake resistant and to allow nuclear power plant operators to (1) decide whether tests should be conducted on their facilities, (2) specify the tests that should be performed, and (3) estimate the cost of the effort to complete the recommended test program.

  9. Verifying seismic design of nuclear reactors by testing. Volume 1: test plan

    International Nuclear Information System (INIS)

    1979-01-01

    This document sets forth recommendations for a verification program to test the ability of operational nuclear power plants to achieve safe shutdown immediately following a safe-shutdown earthquake. The purpose of the study is to develop a program plan to provide assurance by physical demonstration that nuclear power plants are earthquake resistant and to allow nuclear power plant operators to (1) decide whether tests should be conducted on their facilities, (2) specify the tests that should be performed, and (3) estimate the cost of the effort to complete the recommended test program

  10. Development and Preliminary Tests of an Open-Path Airborne Diode Laser Absorption Instrument for Carbon Dioxide

    Science.gov (United States)

    Diskin, Glenn S.; DiGangi, Joshua P.; Yang, Melissa; Slate, Thomas A.; Rana, Mario

    2015-01-01

    Carbon dioxide (CO2) is well known for its importance as an atmospheric greenhouse gas, with many sources and sinks around the globe. Understanding the fluxes of carbon into and out of the atmosphere is a complex and daunting challenge. One tool applied by scientists to measure the vertical flux of CO2 near the surface uses the eddy covariance technique, most often from towers but also from aircraft flying specific patterns over the study area. In this technique, variations of constituents of interest are correlated with fluctuations in the local vertical wind velocity. Measurement requirements are stringent, particularly with regard to precision, sensitivity to small changes, and temporal sampling rate. In addition, many aircraft have limited payload capability, so instrument size, weight, and power consumption are also important considerations. We report on the development and preliminary application of an airborne sensor for the measurement of atmospheric CO2. The instrument, modeled on the successful DLH (Diode Laser Hygrometer) series of instruments, has been tested in the laboratory and on the NASA DC-8 aircraft. Performance parameters such as accuracy, precision, sensitivity, specificity, and temporal response are discussed in the context of typical atmospheric variability and suitability for flux measurement applications. On-aircraft, in-flight data have been obtained and are discussed as well. Performance of the instrument has been promising, and continued flight testing is planned during 2016.

  11. Test plan: Brayton Isotope Power System Ground Demonstration System (BIPS-GDS)

    International Nuclear Information System (INIS)

    1976-01-01

    The purpose of this test plan is to provide an overall outline of all testing to be accomplished on the GDS. Included in this test plan are administrative requirements, instrumentation accuracies, instrumentation, equipment definitions, system test setup, and facility installation. The test program will enable collection of sufficient data to establish material, component, and system design integrity. The data will also be used to establish and evaluate component and system performance and reliability characteristics, verification of proper system component integration prior to initiation of Phase II, and flight system (FS) development

  12. Aquifer test plan for the 100-HR-3 Operable Unit

    International Nuclear Information System (INIS)

    Swanson, L.C.; Hartman, M.J.

    1994-01-01

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues

  13. Project W-314 specific test and evaluation plan 241-AN-B valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  14. In situ treatability test plan

    International Nuclear Information System (INIS)

    1996-08-01

    This document describes the plans for the in situ treatment zone (ISTZ) treatability test for groundwater contaminated with strontium-90. The treatability test is to be conducted at the Hanford Site in Richland, Washington, in a portion of the 100-N Area adjacent to the Columbia River referred to as N-Springs. The purpose of the treatability test is to evaluate the effectiveness of an innovative technology to prevent the discharge of strontium-90 contaminated groundwater into the Columbia River. The ISTZ is a passive technology that consists of placing a treatment agent in the path of the groundwater. The treatment agent must restrict target radioactive contaminants and provide time for the contaminant to decay to acceptable levels. The permeability of the treatment zone must be greater than or equal to that of the surrounding sediments to ensure that the contaminated groundwater flows through the treatment zone agent and not around the agent

  15. General Vehicle Test Plan (GVTP) for Urban Rail Transit Cars

    Science.gov (United States)

    1977-09-01

    The General Vehicle Test Plan provides a system for general vehicle testing and for documenting and utilizing data and information in the testing of urban rail transit cars. Test procedures are defined for nine categories: (1) Performance; (2) Power ...

  16. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification ( OCRWM)

    Energy Technology Data Exchange (ETDEWEB)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-08-07

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria.

  17. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria

  18. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  19. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  20. Reliability Analysis and Test Planning using CAPO-Test for Existing Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Engelund, S.; Faber, Michael Havbro

    2000-01-01

    Evaluation of the reliability of existing concrete structures often requires that the compressive strength of the concrete is estimated on the basis of tests performed with concrete samples from the structure considered. In this paper the CAPO-test method is considered. The different sources...... of uncertainty related to this method are described. It is shown how the uncertainty in the transformation from the CAPO-test results to estimates of the concrete strength can be modeled. Further, the statistical uncertainty is modeled using Bayesian statistics. Finally, it is shown how reliability-based optimal...... planning of CAPO-tests can be performed taking into account the expected costs due to the CAPO-tests and possible repair or failure of the structure considered. An illustrative example is presented where the CAPO-test is compared with conventional concrete cylinder compression tests performed on cores...

  1. Corrective action plan for CAU Number 339: Area 12 Fleet Operations, Steam Cleaning Discharge Area, Nevada Test Site

    International Nuclear Information System (INIS)

    1997-05-01

    The purpose of this Corrective Action Plan (CAP) is to provide the method for implementing the corrective action alternative as provided in the Corrective Action Decision Document (CADD). Detailed information of the site history and results of previous characterizations can be found in the Work Plan, the Preliminary Investigation Report, and the Phase 2 Characterization Report. Previous characterization investigations were completed as a condition of the Temporary Water Pollution Control Permit issued by the Nevada Division of Environmental Protection (NDEP) on July 14, 1992. The scope of this report is to prepare a CAP based upon the selected remedial alternative for closure of the Area 12, Building 12-16 Fleet Operations steam cleaning discharge area. The effluent discharge area has been impacted by volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil. The maximum hydrocarbon and VOC concentrations detected in the Preliminary and Phase 2 Site Characterization Investigations are summarized

  2. Preliminary safety evaluation, based on initial site investigation data. Planning document

    International Nuclear Information System (INIS)

    Hedin, Allan

    2002-12-01

    This report is a planning document for the preliminary safety evaluations (PSE) to be carried out at the end of the initial stage of SKBs ongoing site investigations for a deep repository for spent nuclear fuel. The main purposes of the evaluations are to determine whether earlier judgements of the suitability of the candidate area for a deep repository with respect to long-term safety holds up in the light of borehole data and to provide feed-back to continued site investigations and site specific repository design. The preliminary safety evaluations will be carried out by a safety assessment group, based on a site model, being part of a site description, provided by a site modelling group and a repository layout within that model suggested by a repository engineering group. The site model contains the geometric features of the site as well as properties of the host rock. Several alternative interpretations of the site data will likely be suggested. Also the biosphere is included in the site model. A first task for the PSE will be to compare the rock properties described in the site model to previously established criteria for a suitable host rock. This report gives an example of such a comparison. In order to provide more detailed feedback, a number of thermal, hydrological, mechanical and chemical analyses of the site will also be included in the evaluation. The selection of analyses is derived from the set of geosphere and biosphere analyses preliminarily planned for the comprehensive safety assessment named SR-SITE, which will be based on a complete site investigation. The selection is dictated primarily by the expected feedback to continued site investigations and by the availability of data after the PSE. The repository engineering group will consider several safety related factors in suggesting a repository layout: Thermal calculations will be made to determine a minimum distance between canisters avoiding canister surface temperatures above 100 deg C

  3. Definition study for variable cycle engine testbed engine and associated test program

    Science.gov (United States)

    Vdoviak, J. W.

    1978-01-01

    The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.

  4. Test plan: Hydraulic fracturing and hydrologic tests in Marker Beds 139 and 140

    International Nuclear Information System (INIS)

    Wawersik, W.R.; Beauheim, R.L.

    1991-03-01

    Combined hydraulic fracturing and hydrological measurements in this test plan are designed to evaluate the potential influence of fracture formation in anhydrite Marker Beds 139 and 140 on gas pressure in and gas flow from the disposal rooms in the Waste Isolation Pilot Plant with time. The tests have the further purpose of providing comparisons of permeabilities of anhydrite interbeds in an undisturbed (virgin) state and after fracture development and/or opening and dilation of preexisting partially healed fractures. Three sets of combined hydraulic fracturing and hydrological measurements are planned. A set of trial measurements is expected to last four to six weeks. The duration of each subsequent experiment is anticipated to be six to eight weeks

  5. Reliability demonstration test planning: A three dimensional consideration

    International Nuclear Information System (INIS)

    Yadav, Om Prakash; Singh, Nanua; Goel, Parveen S.

    2006-01-01

    Increasing customer demand for reliability, fierce market competition on time-to-market and cost, and highly reliable products are making reliability testing more challenging task. This paper presents a systematic approach for identifying critical elements (subsystems and components) of the system and deciding the types of test to be performed to demonstrate reliability. It decomposes the system into three dimensions (i.e. physical, functional and time) and identifies critical elements in the design by allocating system level reliability to each candidate. The decomposition of system level reliability is achieved by using criticality index. The numerical value of criticality index for each candidate is derived based on the information available from failure mode and effects analysis (FMEA) document or warranty data from a prior system. It makes use of this information to develop reliability demonstration test plan for the identified (critical) failure mechanisms and physical elements. It also highlights the benefits of using prior information in order to locate critical spots in the design and in subsequent development of test plans. A case example is presented to demonstrate the proposed approach

  6. Project W-314 Polyurea Special Protective Coating (SPC) Test Plan Chemical Compatibility and Physical Characteristics Testing

    International Nuclear Information System (INIS)

    MAUSER, R.W.

    2001-01-01

    This Test Plan outlines the testing to be done on the Special Protective Coating (SPC) Polyurea which includes: Tank Waste Compatibility, Decontamination Factor Testing, and Adhesion Strength Testing after a sample has been exposed to Radiation

  7. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1995-01-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the open-quotes Free Drop Testclose quotes procedure for the SPM-1 package

  8. Preliminary study fo the interference of proteic compounds of radiopharmaceuticals in the test of lisadode amebocitos de limulus (LAL)

    International Nuclear Information System (INIS)

    Aldana, Claudia

    1997-01-01

    In this thesis the objective was evaluate the interference of proteic compounds of the radiopharmaceuticals in the test LAL (lisado of amebocitos de limulus) for this, macroagregates of albumina (MAA) was used with metilendifosfonato (MDP) as control that is the radiopharmaceutical more used in the nuclear medicine centers of the country. Initially preliminary test were carried out to assess if some of two radiopharmaceuticals would cause interference with LAL test, after the test was validated and finally routine tests were made. With the preliminary assays was concluded that proteic compounds did not cause interference (albumina with a concentration of 2 md/dl) with the MAA. However with the MDP cause interference with LAL test. The interference was eliminated with a dilution of 1:8 of the sample. Was concluded that the success of LAL test depends on conditions such as temperature, pH, constant incubation (no minimum variations) and that is a good test for quality control of the radiopharmaceuticals

  9. Test and Evaluation for Enhanced Security: A Quantitative Method to Incorporate Expert Knowledge into Test Planning Decisions.

    Energy Technology Data Exchange (ETDEWEB)

    Rizzo, Davinia [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Blackburn, Mark [Stevens Inst. of Technology, Hoboken, NJ (United States)

    2017-03-01

    Complex systems are comprised of technical, social, political and environmental factors as well as the programmatic factors of cost, schedule and risk. Testing these systems for enhanced security requires expert knowledge in many different fields. It is important to test these systems to ensure effectiveness, but testing is limited to due cost, schedule, safety, feasibility and a myriad of other reasons. Without an effective decision framework for Test and Evaluation (T&E) planning that can take into consideration technical as well as programmatic factors and leverage expert knowledge, security in complex systems may not be assessed effectively. Therefore, this paper covers the identification of the current T&E planning problem and an approach to include the full variety of factors and leverage expert knowledge in T&E planning through the use of Bayesian Networks (BN).

  10. HACCP and water safety plans in Icelandic water supply: preliminary evaluation of experience.

    Science.gov (United States)

    Gunnarsdóttir, María J; Gissurarson, Loftur R

    2008-09-01

    Icelandic waterworks first began implementing hazard analysis and critical control points (HACCP) as a preventive approach for water safety management in 1997. Since then implementation has been ongoing and currently about 68% of the Icelandic population enjoy drinking water from waterworks with a water safety plan based on HACCP. Preliminary evaluation of the success of HACCP implementation was undertaken in association with some of the waterworks that had implemented HACCP. The evaluation revealed that compliance with drinking water quality standards improved considerably following the implementation of HACCP. In response to their findings, waterworks implemented a large number of corrective actions to improve water safety. The study revealed some limitations for some, but not all, waterworks in relation to inadequate external and internal auditing and a lack of oversight by health authorities. Future studies should entail a more comprehensive study of the experience with the use of HACCP with the purpose of developing tools to promote continuing success.

  11. Test plan, sludge retrieval, sludge packaging

    International Nuclear Information System (INIS)

    Feigenbutz, L.V.

    1994-01-01

    This document provides direction for the cold testing of tools, equipment and systems which will be installed and operated in K-East (KE) Basin in support of the sludge retrieval and packaging project. The technical uncertainties related to the effectiveness of sludge retrieval procedures and equipment require that cold testing be completed before installation in KE Basin to identify and resolve existing problems, and to optimize the efficiency of all equipment and systems used. This plan establishes the responsibilities, test requirements, and documentation requirements necessary to complete cold tests of: (1) equipment with no potential for plant use; (2) prototype equipment and systems which may be upgraded for use in K-Basin; and (3) plant equipment and systems requiring cold acceptance testing prior to plant use. Some equipment and systems may have been subject to a formal design review and safety assessment; the results of which will be included as supporting documents to the operational readiness review (ORR)

  12. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  13. Test phase plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1993-03-01

    The US Department of Energy (DOE) has prepared this Test Phase Plan for the Waste Isolation Pilot Plant to satisfy the requirements of Public Law 102-579, the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (LWA). The Act provides seven months after its enactment for the DOE to submit this Plan to the Environmental Protection Agency (EPA) for review. A potential geologic repository for transuranic wastes, including transuranic mixed wastes, generated in national-defense activities, the WIPP is being constructed in southeastern New Mexico. Because these wastes remain radioactive and chemically hazardous for a very long time, the WIPP must provide safe disposal for thousands of years. The DOE is developing the facility in phases. Surface facilities for receiving waste have been built and considerable underground excavations (2150 feet below the surface) that are appropriate for in-situ testing, have been completed. Additional excavations will be completed when they are required for waste disposal. The next step is to conduct a test phase. The purpose of the test phase is to develop pertinent information and assess whether the disposal of transuranic waste and transuranic mixed waste in the planned WIPP repository can be conducted in compliance with the environmental standards for disposal and with the Solid Waste Disposal Act (SWDA) (as amended by RCRA, 42 USC. 6901 et. seq.). The test phase includes laboratory experiments and underground tests using contact-handled transuranic waste. Waste-related tests at WIPP will be limited to contact-handled transuranic and simulated wastes since the LWA prohibits the transport to or emplacement of remote-handled transuranic waste at WIPP during the test phase

  14. Mineralogical test as a preliminary step for metallurgical proses of Kalan ores

    International Nuclear Information System (INIS)

    Affandi, K.

    1998-01-01

    Mineralogical tests as a preliminary step for hydrometallurgy of Kalan ores, including Eko Remaja and Rirang have been carried out to identify the elements and minerals content which affect the metallurgical process, especially the leaching and purification of uranium. Mineralogical tests have been done by means of radioactive and radioluxugraph tests to identify radioactive minerals; thin specimen analysis, Scanning Electron Microscopy (SEM) to identify elements and morphology, EPMA to analyse qualitatively the elements, X-ray Diffractometer (XRD) to identify of minerals content; and X-ray Fluorescence (XRF) and chemical analyses to determine total elements qualitatively and quantitatively. The experimental results show that the Eko Remaja ores contain uraninite and brannerite, iron and titan oxides, sulfides, phosphates and silicates minerals, while the Rirang ores contain uraninite, monazite and molybdenite

  15. Standard review plan for the review and evaluation of emergency plans for research and test reactors. Technical report

    International Nuclear Information System (INIS)

    Bates, E.F.; Grimes, B.K.; Ramos, S.L.

    1982-05-01

    This document provides a Standard Review Plan for the guidance of the NRC staff to assure that complete and uniform reviews are made of research and test reactor emergency plans. The report is organized under ten planning standards which correspond to the guidance criteria in Draft II of ANSI/ANS 15.16 as endorsed by Revision 1 to Regulatory Guide 2.6. The applicability of the items under each planning standard is indicated by subdivisions of the steady state thermal power levels at which the reactors are licensed to operate. Standard emergency classes and example action levels for research and test reactors which should initiate these classes are given in an Appendix

  16. Front-end Electronics for Unattended Measurement (FEUM). Prototype Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, Ryan C.; Morris, Scott J.; Smith, Leon E.; Keller, Daniel T.

    2015-09-16

    The IAEA has requested that PNNL perform an initial set of tests on front-end electronics for unattended measurement (FEUM) prototypes. The FEUM prototype test plan details the tests to be performed, the criteria for evaluation, and the procedures used to execute the tests.

  17. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  18. Preliminary testing of a planar converter with uranium oxide pellets in the emitter

    International Nuclear Information System (INIS)

    Miskolczy, G.; Lieb, D.P.; Hatch, G.L.

    1992-01-01

    Nuclear reactor thermionic space power systems incorporating thermionic fuel element generally use refractory metal emitters, which contain the nuclear fuel. The purpose of the current work is to determine the effect, if any, of the diffusion of uranium oxide fuel through chemically vapor deposited (CVD) tungsten on converter performance. This paper describes the preliminary testing of the converter to assess the converter performance before any significant diffusion takes place. In testing, the emitter temperature was 1800 K and the collector temperature was varied from 1000 K to 1070 K. Experiments also examined pressure versus loading characteristics of the graphite

  19. Results of Preliminary Tests of PAR Bunch Cleaning

    CERN Document Server

    Yao, Chihyuan; Grelick, Arthur; Lumpkin, Alex H; Sereno, Nicholas S

    2005-01-01

    A particle accumulator ring (PAR) is used at the Advanced Photon Source (APS) to collect multiple linac bunches and compress them into a 0.3-ns (rms) single bunch for booster injection. A 9.77-MHz fundamental rf system and a 117.3-MHz harmonic rf system are employed for initial beam capture and bunch length compression. Satellite bunches with very low charge form due to rf phase drifts or beam loading change. These satellites, when injected into the booster and then into the storage ring (SR), cause bunch impurity at three buckets from the target bucket. Storage ring and booster bunch cleaning was tried but proved to be difficult due to the top-up mode of operation in the storage ring and tune drift in the booster synchrotron. Recently we implemented a PAR bunch-cleaning system with tune-modulated harmonic rf knockout. Preliminary tests gave a measured SR bunch purity of better than 10

  20. Static Aeroelastic Deformation Effects in Preliminary Wind-tunnel Tests of Silent Supersonic Technology Demonstrator

    OpenAIRE

    Makino, Yoshikazu; Ohira, Keisuke; Makimoto, Takuya; Mitomo, Toshiteru; 牧野, 好和; 大平, 啓介; 牧本, 卓也; 三友, 俊輝

    2011-01-01

    Effects of static aeroelastic deformation of a wind-tunnel test model on the aerodynamic characteristics are discussed in wind-tunnel tests in the preliminary design phase of the silent supersonic technology demonstrator (S3TD). The static aeroelastic deformation of the main wing is estimated for JAXA 2m x 2m transonic wind-tunnel and 1m x 1m supersonic wind-tunnel by a finite element method (FEM) structural analysis in which its structural model is tuned with the model deformation calibratio...

  1. Quality assurance: Fundamental reproducibility tests for 3D treatment‐planning systems

    Science.gov (United States)

    Able, Charles M.; Thomas, Michael D.

    2005-01-01

    The use of image‐based 3D treatment planning has significantly increased the complexity of commercially available treatment‐planning systems (TPSs). Medical physicists have traditionally focused their efforts on understanding the calculation algorithm; this is no longer possible. A quality assurance (QA) program for our 3D treatment‐planning system (ADAC Pinnacle3) is presented. The program is consistent with the American Association of Physicists in Medicine Task Group 53 guidelines and balances the cost‐versus‐benefit equation confronted by the clinical physicist in a community cancer center environment. Fundamental reproducibility tests are presented as required for a community cancer center environment using conventional and 3D treatment planning. A series of nondosimetric tests, including digitizer accuracy, image acquisition and display, and hardcopy output, is presented. Dosimetric tests include verification of monitor units (MUs), standard isodoses, and clinical cases. The tests are outlined for the Pinnacle3 TPS but can be generalized to any TPS currently in use. The program tested accuracy and constancy through several hardware and software upgrades to our TPS. This paper gives valuable guidance and insight to other physicists attempting to approach TPS QA at fundamental and practical levels. PACS numbers: 87.53.Tf, 87.53.Xd PMID:16143788

  2. Persian competing word test: Development and preliminary results in normal children

    Directory of Open Access Journals (Sweden)

    Mohammad Ebrahim Mahdavi

    2008-12-01

    Full Text Available Background and Aim: Assessment of central auditory processing skills needs various behavioral tests in format of a test battery. There is a few Persian speech tests for documenting central auditory processing disorders. The purpose of this study was developing a dichotic test formed of one-syllabic words suitable for evaluation of central auditory processing in Persian language children and reporting its preliminary results in a group of normal children.Materials and Methods: Persian words in competing manner test was developed utilizing most frequent monosyllabic words in children storybooks reported in the previous researches. The test was performed at MCL on forty-five normal children (39 right-handed and 6 left-handed aged 5-11 years. The children did not show any obvious problem in hearing, speech, language and learning. Free (n=28 and directed listening (n=17 tasks were investigated.Results: The results show that in directed listening task, there is significant advantage for performance of pre-cued ear relative to opposite side. Right ear advantage is evident in free recall condition. Average performance of the children in directed recall is significantly better than free recall. Average row score of the test increases with the children age.Conclusion: Persian words in competing manner test as a dichotic test, can show major characteristics of dichotic listening and effect of maturation of central auditory system on it in normal children.

  3. Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods

    Science.gov (United States)

    Green, Lawrence L.; Maxwell, Katherine A.; Glass, David E.; Vaughn, Wallace L.; Barger, Weston; Cook, Mylan

    2016-01-01

    The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.

  4. 100 area excavation treatability test plan

    International Nuclear Information System (INIS)

    1993-05-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications

  5. Hanford Site physical separations CERCLA treatability test plan

    International Nuclear Information System (INIS)

    1992-03-01

    This test plan describes specifications, responsibilities, and general procedures to be followed to conduct a physical separations soil treatability test in the North Process Pond of the 300-FF-1 Operable Unit at the Hanford Site, Washington. The objective of this test is to evaluate the use of physical separation systems as a means of concentrating chemical and radioactive contaminants into fine soil fractions and thereby minimizing waste volumes. If successful the technology could be applied to clean up millions of cubic meters of contaminated soils in waste sites at Hanford and other sites. It is not the intent of this test to remove contaminated materials from the fine soils. Physical separation is a simple and comparatively low cost technology to potentially achieve a significant reduction in the volume of contaminated soils. Organic contaminants are expected to be insignificant for the 300-FF-I Operable Unit test, and further removal of metals and radioactive contaminants from the fine fraction of soils will require secondary treatment such as chemical extraction, electromagnetic separation, or other technologies. Additional investigations/testing are recommended to assess the economic and technical feasibility of applying secondary treatment technologies, but are not within the scope of this test. This plan provides guidance and specifications for the treatability test to be conducted as a service contract. More detailed instructions and procedures will be provided as part of the vendors (sellers) proposal. The procedures will be approved by Westinghouse Hanford Company (Westinghouse Hanford) and finalized by the seller prior to initiating the test

  6. Design and preliminary testing of a MEMS microphone phased array for aeroacoustic testing of a small-scale wind turbine airfoil

    Energy Technology Data Exchange (ETDEWEB)

    Bale, A.; Orlando, S.; Johnson, D. [Waterloo Univ., ON (Canada). Wind Energy Group

    2010-07-01

    One of the barriers preventing the widespread utilization of wind turbines is the audible sound that they produce. Developing quieter wind turbines will increase the amount of available land onto which wind farms can be built. Noise emissions from wind turbines can be attributed to the aerodynamic effects between the turbine blades and the air surrounding them. A dominant source of these aeroacoustic emissions from wind turbines is known to originate at the trailing edges of the airfoils. This study investigated the flow physics of noise generation in an effort to reduce noise from small-scale wind turbine airfoils. The trailing edge noise was studied on scale-models in wind tunnels and applied to full scale conditions. Microphone phased arrays are popular research tools in wind tunnel aeroacoustic studies because they can measure and locate noise sources. However, large arrays of microphones can be prohibitively expensive. This paper presented preliminary testing of micro-electrical mechanical system (MEMS) microphones in phased arrays for aeroacoustic testing on a small wind turbine airfoil. Preliminary results showed that MEMS microphones are an acceptable low-cost alternative to costly condenser microphones. 19 refs., 1 tab., 11 figs.

  7. Preliminary Feasibility, Design, and Hazard Analysis of a Boiling Water Test Loop Within the Idaho National Laboratory Advanced Test Reactor National Scientific User Facility

    International Nuclear Information System (INIS)

    Gerstner, Douglas M.

    2009-01-01

    The Advanced Test Reactor (ATR) is a pressurized light-water reactor with a design thermal power of 250 MW. The principal function of the ATR is to provide a high neutron flux for testing reactor fuels and other materials. The ATR and its support facilities are located at the Idaho National Laboratory (INL). A Boiling Water Test Loop (BWTL) is being designed for one of the irradiation test positions within the. The objective of the new loop will be to simulate boiling water reactor (BWR) conditions to support clad corrosion and related reactor material testing. Further it will accommodate power ramping tests of candidate high burn-up fuels and fuel pins/rods for the commercial BWR utilities. The BWTL will be much like the pressurized water loops already in service in 5 of the 9 'flux traps' (region of enhanced neutron flux) in the ATR. The loop coolant will be isolated from the primary coolant system so that the loop's temperature, pressure, flow rate, and water chemistry can be independently controlled. This paper presents the proposed general design of the in-core and auxiliary BWTL systems; the preliminary results of the neutronics and thermal hydraulics analyses; and the preliminary hazard analysis for safe normal and transient BWTL and ATR operation

  8. Preliminary Test of Friction disk type turbine for S-CO{sub 2} cycle application

    Energy Technology Data Exchange (ETDEWEB)

    Baik, Seungjoon; Kim, Hyeon Tae; Lee, Jeong Ik [KAIST, Daejeon (Korea, Republic of)

    2016-05-15

    Due to the relatively mild sodium-CO{sub 2} interaction, the S-CO{sub 2} Brayton cycle can reduce the accident consequence compared to the steam Rankine cycle. Also the S-CO{sub 2} power conversion cycle can achieve high efficiency for SFR core thermal condition. Moreover, the S-CO{sub 2} power cycle can reduce the total cycle footprint due to high density of the working fluid. However, the high pressure operating condition and low viscosity of the fluid cause difficulties in designing appropriate seals and multi-stage turbo machineries. To solve the problem for designing turbo machineries in a creative way, KAIST research team tested a friction disk type turbine concept for the S-CO{sub 2} cycle application. In this paper, the investigation of the Tesla turbine and preliminary test results with compressed air are covered. The KAIST research team investigated a friction disk type turbine, named as Tesla turbine, for the S-CO{sub 2} power cycle applications. Due to the robust design of the fiction disk type, the Tesla turbine technology can be utilized not only for S-CO{sub 2} turbo machinery but also for the multi-phase or sludge flow turbo machinery. The preliminary test of lab-scale Tesla turbine with compressed air was conducted. The high pressure vessel was manufactured for the S-CO{sub 2} operating condition. The test will be concentrated on the turbine efficiency measurement under various conditions and development of the design methodology.

  9. Standing the Test of Time: Reference for a Preliminary Ruling

    DEFF Research Database (Denmark)

    Butler, Graham

    2017-01-01

    It is often too easy to forget just how important the preliminary reference procedure is for the functionality of European Union law. For the Court of Justice, there are both formal and informal means of judicial dialogue. This article focuses on the formal means of dialogue through the preliminary...

  10. EPRI/DOE High Burnup Fuel Sister Pin Test Plan Simplification and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Saltzstein, Sylvia J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hanson, Brady [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Billone, Mike [Argonne National Lab. (ANL), Argonne, IL (United States); Scaglione, John [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-07-01

    The EPRI/DOE High Burnup Confirmatory Data Project (herein called the "Demo") is a multi-year, multi-entity confirmation demonstration test with the purpose of providing quantitative and qualitative data to show how high-burnup fuel ages in dry storage over a ten-year period. The Demo involves obtaining 32 assemblies of high-burnup PWR fuel of four common cladding alloys from the North Anna Nuclear Power Plant, drying them according to standard plant procedures, and then storing them in an NRC-licensed TN-3 2B cask on the North Anna dry storage pad for ten years. After the ten-year storage time, the cask will be opened and the rods will be examined for signs of aging. Twenty-five rods from assemblies of similar claddings, in-reactor placement, and burnup histories (herein called "sister rods") have been shipped from the North Anna Nuclear Power Plant and are currently being nondestructively tested at Oak Ridge National Laboratory. After the non-destructive testing has been completed for each of the twenty-five rods, destructive analysis will be performed at ORNL, PNNL, and ANL to obtain mechanical data. Opinions gathered from the expert interviews, ORNL and PNNL Sister Rod Test Plans, and numerous meetings has resulted in the Simplified Test Plan described in this document. Some of the opinions and discussions leading to the simplified test plan are included here. Detailed descriptions and background are in the ORNL and PNNL plans in the appendices . After the testing described in this simplified test plan h as been completed , the community will review all the collected data and determine if additional testing is needed.

  11. Mercury flow tests (first report). Wall friction factor measurement tests and future tests plan

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Kinoshita, Hidetaka; Haga, Katsuhiro; Hino, Ryutaro; Sudo, Yukio

    1999-07-01

    In the neutron science project at JAERI, we plan to inject a pulsed proton beam of a maximum power of 5 MW from a high intense proton accelerator into a mercury target in order to produce high energy neutrons of a magnitude of ten times or more than existing facilities. The neutrons produced by the facility will be utilized for advanced field of science such as the life sciences etc. An urgent issue in order to accomplish this project is the establishment of mercury target technology. With this in mind, a mercury experimental loop with the capacity to circulate mercury up to 15 L/min was constructed to perform thermal hydraulic tests, component tests and erosion characteristic tests. A measurement of the wall friction factor was carried out as a first step of the mercury flow tests, while testing the characteristic of components installed in the mercury loop. This report presents an outline of the mercury loop and experimental results of the wall friction factor measurement. From the wall friction factor measurement, it was made clear that the wettability of the mercury was improved with an increase of the loop operation time and at the same time the wall friction factors were increased. The measured wall friction factors were much lower than the values calculated by the Blasius equation at the beginning of the loop operation because of wall slip caused by a non-wetted condition. They agreed well with the values calculated by the Blasius equation within a deviation of 10% when the sum of the operation time increased more than 11 hours. This report also introduces technical problems with a mercury circulation and future tests plan indispensable for the development of the mercury target. (author)

  12. Test plan for FY-94 digface characterization field experiments

    International Nuclear Information System (INIS)

    Josten, N.E.; Roybal, L.G.

    1994-08-01

    The digface characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since fiscal year (FY) 1992 through the support of the Buried Waste Integrated Demonstration Program. A digface characterization system conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation digface and collects data that provide a basis for detecting, locating, and classifying buried materials and hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes ongoing efforts to test the digface characterization concept at the INEL's Cold Test Pit using a simplified prototype deployment apparatus and off-the-shelf sensors. FY-94 field experiments will explore problems in object detection and classification. Detection and classification of objects are fundamental to three of the four primary functions of digface characterization during overburden removal. This test plan establishes procedures for collecting and validating the digface characterization data sets. Analysis of these data will focus on testing and further developing analysis methods for object detection and classification during overburden removal

  13. Fast Flux Test Facility project plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  14. Fast Flux Test Facility project plan. Revision 2

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  15. Preliminary results on tests of a Cerenkov ring imaging device employing a photoionizing PWC

    Energy Technology Data Exchange (ETDEWEB)

    Durkin, S.; Honma, A.; Leith, D.W.G.S.

    1978-08-01

    A brief description of techniques and problems of ring imaging Cerenkov detectors employing photoionizing PWC's is discussed. Preliminary results on a one dimensional ring imaging device tested at SLAC in May and June of 1978 are then presented. These results include rough measurements of the Cerenkov ring in nitrogen, argon, neon, and helium produced by a collimated positron beam.

  16. The Space Station Photovoltaic Panels Plasma Interaction Test Program: Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1989-01-01

    The Plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  17. The Space Station photovoltaic panels plasma interaction test program - Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1990-01-01

    The plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  18. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  19. The development and preliminary testing of a multimedia patient–provider survivorship communication module for breast cancer survivors

    Science.gov (United States)

    Wen, Kuang-Yi; Miller, Suzanne M.; Stanton, Annette L.; Fleisher, Linda; Morra, Marion E.; Jorge, Alexandra; Diefenbach, Michael A.; Ropka, Mary E.; Marcus, Alfred C.

    2012-01-01

    Objective This paper describes the development of a theory-guided and evidence-based multimedia training module to facilitate breast cancer survivors’ preparedness for effective communication with their health care providers after active treatment. Methods The iterative developmental process used included: (1) theory and evidence-based content development and vetting; (2) user testing; (3) usability testing; and (4) participant module utilization. Results Formative evaluation of the training module prototype occurred through user testing (n = 12), resulting in modification of the content and layout. Usability testing (n = 10) was employed to improve module functionality. Preliminary web usage data (n = 256, mean age = 53, 94.5% White, 75% college graduate and above) showed that 59% of the participants accessed the communication module, for an average of 7 min per login. Conclusion The iterative developmental process was informative in enhancing the relevance of the communication module. Preliminary web usage results demonstrate the potential feasibility of such a program. Practice implications Our study demonstrates survivors’ openness to the use of a web-based communication skills training module and outlines a systematic iterative user and interface program development and testing process, which can serve as a prototype for others considering such an approach. PMID:22770812

  20. The development and preliminary testing of a multimedia patient-provider survivorship communication module for breast cancer survivors.

    Science.gov (United States)

    Wen, Kuang-Yi; Miller, Suzanne M; Stanton, Annette L; Fleisher, Linda; Morra, Marion E; Jorge, Alexandra; Diefenbach, Michael A; Ropka, Mary E; Marcus, Alfred C

    2012-08-01

    This paper describes the development of a theory-guided and evidence-based multimedia training module to facilitate breast cancer survivors' preparedness for effective communication with their health care providers after active treatment. The iterative developmental process used included: (1) theory and evidence-based content development and vetting; (2) user testing; (3) usability testing; and (4) participant module utilization. Formative evaluation of the training module prototype occurred through user testing (n = 12), resulting in modification of the content and layout. Usability testing (n = 10) was employed to improve module functionality. Preliminary web usage data (n = 256, mean age = 53, 94.5% White, 75% college graduate and above) showed that 59% of the participants accessed the communication module, for an average of 7 min per login. The iterative developmental process was informative in enhancing the relevance of the communication module. Preliminary web usage results demonstrate the potential feasibility of such a program. Our study demonstrates survivors' openness to the use of a web-based communication skills training module and outlines a systematic iterative user and interface program development and testing process, which can serve as a prototype for others considering such an approach. Copyright © 2012. Published by Elsevier Ireland Ltd.

  1. Birth Planning Values and Decisions: Preliminary Findings.

    Science.gov (United States)

    Townes, Brenda D.; And Others

    The values and processes which underlie people's birth planning decisions were studied via decision theory. Sixty-three married couples including 23 with no children, 33 with one child, and 27 with two children were presented with a large set of personal values related to birth planning decisions. Individuals rated the importance or utility of…

  2. Parametric analyses of planned flowing uranium hexafluoride critical experiments

    Science.gov (United States)

    Rodgers, R. J.; Latham, T. S.

    1976-01-01

    Analytical investigations were conducted to determine preliminary design and operating characteristics of flowing uranium hexafluoride (UF6) gaseous nuclear reactor experiments in which a hybrid core configuration comprised of UF6 gas and a region of solid fuel will be employed. The investigations are part of a planned program to perform a series of experiments of increasing performance, culminating in an approximately 5 MW fissioning uranium plasma experiment. A preliminary design is described for an argon buffer gas confined, UF6 flow loop system for future use in flowing critical experiments. Initial calculations to estimate the operating characteristics of the gaseous fissioning UF6 in a confined flow test at a pressure of 4 atm, indicate temperature increases of approximately 100 and 1000 K in the UF6 may be obtained for total test power levels of 100 kW and 1 MW for test times of 320 and 32 sec, respectively.

  3. Prototype steam generator test at SCTI/ETEC. Acoustic program test plan

    International Nuclear Information System (INIS)

    Greene, D.A.; Thiele, A.; Claytor, T.N.

    1981-10-01

    This document is an integrated test plan covering programs at General Electric (ARSD), Rockwell International (RI) and Argonne National Laboratory (CT). It provides an overview of the acoustic leak detection test program which will be completed in conjunction with the prototype LMFBR steam generator at the Energy Technology Engineering Laboratory. The steam generator is installed in the Sodium Components Test Installation (SCTI). Two acoustic detection systems will be used during the test program, a low frequency system developed by GE-ARSD (GAAD system) and a high frequency system developed by RI-AI (HALD system). These systems will be used to acquire data on background noise during the thermal-hydraulic test program. Injection devices were installed during fabrication of the prototype steam generator to provide localized noise sources in the active region of the tube bundle. These injectors will be operated during the steam generator test program, and it will be shown that they are detected by the acoustic systems

  4. Welding of metallic fuel elements for the irradiation test in JOYO. Preliminary tests and welding execution tests (Joint research)

    International Nuclear Information System (INIS)

    Kikuchi, Hironobu; Nakamura, Kinya; Iwai, Takashi; Arai, Yasuo

    2009-10-01

    Irradiation tests of metallic fuels elements in fast test reactor JOYO are planned under the joint research of Japan Atomic Energy Agency (JAEA) and Central Research Institute of Electric Power Industry (CRIEPI). Six U-Pu-Zr fuel elements clad with ferritic martensitic steel are fabricated in Plutonium Fuel Research Facility (PFRF) of JAEA-Oarai for the first time in Japan. In PFRF, the procedures of fabrication of the fuel elements were determined and the test runs of the equipments were carried out before the welding execution tests for the fuel elements. Test samples for confirming the welding condition between the cladding tube and top and bottom endplugs were prepared, and various test runs were carried out before the welding execution tests. As a result, the welding conditions were finalized by passing the welding execution tests. (author)

  5. Characteristics, finite element analysis, test description, and preliminary test results of the STM4-120 kinematic Stirling engine

    Science.gov (United States)

    Linker, K. L.; Rawlinson, K. S.; Smith, G.

    1991-10-01

    The Department of Energy's Solar Thermal Program has, as one of its program elements, the development and evaluation of conversion device technologies applicable to dish-electric systems. The primary research and development combines a conversion device (heat engine), solar receiver, and generator mounted at the focus of a parabolic dish concentrator. The Stirling-cycle heat engine was identified as the conversion device for dish-electric with the most potential for meeting the program's goals for efficiency, reliability, and installed cost. To advance the technology toward commercialization, Sandia National Laboratories has acquired a Stirling Thermal Motors, Inc. kinematic Stirling engine, STM4-120, for evaluation. The engine is being bench-tested at Sandia's Engine Test Facility and will be combined later with a solar receiver for on-sun evaluation. This report presents the engine characteristics, finite element analyses of critical engine components, test system layout, instrumentation, and preliminary performance results from the bench test.

  6. Manufacturing and preliminary tests of a 12 T ''wind and react'' coil

    International Nuclear Information System (INIS)

    Corte, A. della; Pasotti, G.; Sacchetti, N.; Spadoni, M.; Oliva, A.B.; Penco, R.; Parodi, S.; Valle, N.; Specking, W.

    1994-01-01

    As already reported ENEA is engaged in the realization of a 12 T wind and react Nb 3 Sn coil, a subsize magnet designed to simulate many technological problems to be faced in NET-ITER magnets. EM-LMI and Ansaldo are the industrial partners in this project. A preliminary winding has been built and successfully tested. This winding has been cut in pieces and carefully inspected to be sure that the impregnation process after the heat treatment works well. No particular flaws have been detected. Then manufacturing of the 12 T magnet has been started and completed in about three months. Heat treatment, impregnation and electrical tests at 300 K have been successfully performed and the magnet is now ready for final tests. In order to obtain the most significant scientific and technological information from this magnet, the original test program (insertion of the coil in the SULTAN facility) has been modified according to a decision of the Fusion Technology Steering Committee (FTSC) of EURATOM. Details of the new test programs are given in the paper

  7. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  8. Preliminary Process Theory does not validate the Comparison Question Test: A comment on Palmatier and Rovner

    NARCIS (Netherlands)

    Ben-Shakar, G.; Gamer, M.; Iacono, W.; Meijer, E.; Verschuere, B.

    2015-01-01

    Palmatier and Rovner (2015) attempt to establish the construct validity of the Comparison Question Test (CQT) by citing extensive research ranging from modern neuroscience to memory and psychophysiology. In this comment we argue that merely citing studies on the preliminary process theory (PPT) of

  9. Stress analysis of HLW containers. Preliminary ring test exercise Compas project

    International Nuclear Information System (INIS)

    1989-01-01

    This document describes the series of experiments and associated calculations performed as the Compas preliminary ring test exercise. A number of mild steel rings, representative of sections through HLW containers, some notched and pre-cracked, were tested in compression right up to and beyond their ultimate load. The Compas project partners independently modelled the behaviour of these rings using their finite element codes. Four different ring types were tested, and each test was repeated three times. For three of the ring types, the three test repetitions gave identical results. The fourth ring, which was not modelled by the partners, had a 4 mm thick layer of weld metal deposited on its surface. The three tests on this ring did not give identical results and suggested that the effect of welding methods should be addressed at a later stage of the project. Fracture was not found to be a significant cause of ring failure. The results of the ring tests were compared with the partners predictions, and additionally some time was spent assessing where the use of the codes could be improved. This exercise showed that the partners codes have the ability to produce results within acceptable limits. Most codes were unable to model stable crack growth. There were indications that some codes would not be able to cope with a significantly more complex three-dimensional analysis

  10. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  11. Test plan for the retrieval demonstration

    International Nuclear Information System (INIS)

    Valentich, D.J.

    1993-05-01

    This test plan describes a simulated buried waste retrieval demonstration that will be performed at the Caterpillar, Inc., Edwards Training Center located near Peoria, Illinois. The purpose of the demonstration is to determine the effectiveness of using readily available excavation equipment to retrieve, size, and handle various simulated waste forms that are similar in size, structure, and composition to those expected to be found in US Department of Energy contaminated waste pits and trenches. The objectives of this demonstration are to: meet and maintain daily production goals of 80 yd 3 /day; minimize spillage and dust generation through careful and deliberate operations; document and evaluate methods for manipulating, sizing, and/or working around large objects; and document and evaluate requirements for operator augmentation and remote operation for hot test pit excavation operations. Four conditions comprising the range of environments to be evaluated include excavation of random material from below grade; stacked boxes and barrels from below grade; random materials from at grade; and stacked boxes and barrels from at grade. Results of the retrieval demonstration will reduce unknowns in the body of knowledge about retrieval equipment and procedural options for removal of buried transuranic (TRU) waste at the Idaho National Engineering Laboratory. It is anticipated that DOE will factor this information into a remedial investigation/feasibility plan leading to a final record of decision for disposition of buried TRU waste

  12. Out-pile test plan for lifetime extension of shutoff units in HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Joe, Y. G.; Lee, J. H.; Jeong, Y. H.; Woo, S. I.; Ryu, J. S.; Kim, Y. G.; Park, Y. C.; Kim, H. G.; Woo, J. S. [KAERI, Taejon (Korea, Republic of)

    2003-10-01

    It is estimated that the number of drops of shutoff rods in HANARO will reach the endurance verified numbers before the end of the reactor life. To resolve this situation, we have a plan to prepare of a new spare unit by the performance verification test for the local product, and extend the lifetime of shutoff units installed in the reactor by performing an additional endurance test in the out-pile test facility using an existing spare unit. This paper describes the overall situations and test plan for the out-pile test to extend the lifetime extension of shutoff unit.

  13. Group SkSP-R sampling plan for accelerated life tests

    Indian Academy of Sciences (India)

    Muhammad Aslam

    2017-09-15

    Sep 15, 2017 ... SkSP-R sampling; life test; Weibull distribution; producer's risk; ... designed a sampling plan under a time-truncated life test .... adjusted using an acceleration factor. ... where P is the probability of lot acceptance for a single.

  14. Preliminary Tests Of The Decris-sc Ion Source

    CERN Document Server

    Efremov, A; Bechterev, V; Bogomolov, S L; Bondarenko, P G; Datskov, V I; Dmitriev, S; Drobin, V; Lebedev, A; Leporis, M; Malinowski, H; Nikiforov, A; Paschenko, S V; Seleznev, V; Shishov, Yu A; Smirnov, Yu; Tsvineva, G; Yakovlev, B; Yazvitsky, N Yu

    2004-01-01

    A new "liquid He-free" superconducting Electron Cyclotron Resonance Ion Source DECRIS-SC, to be used as injector for the IC-100 small cyclotron, has been designed by FLNR and LHE JINR. The main feature is that a compact refrigerator of Gifford-McMahon type is used to cool the solenoid coils. For the reason of very small cooling power at 4.2 K (about 1 W) our efforts were to optimize the magnetic structure and minimize an external heating of the coils. The maximum magnetic field strength is 3 T and 2 T in injection and extraction region respectively. For the radial plasma confinement a hexapole made of NdFeB permanent magnet is used. The source will be capable of ECR plasma heating using different frequencies (14 GHz or 18 GHz). To be able to deliver usable intensities of solids, the design is also allow axial access for evaporation oven and metal samples using the plasma sputtering technique. Very preliminary results of the source test are presented.

  15. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  16. Irradiated test fuel shipment plan for the LWR MOX fuel irradiation test project

    International Nuclear Information System (INIS)

    Shappert, L.B.; Dickerson, L.S.; Ludwig, S.B.

    1998-01-01

    This document outlines the responsibilities of DOE, DOE contractors, the commercial carrier, and other organizations participating in a shipping campaign of irradiated test specimen capsules containing mixed-oxide (MOX) fuel from the Idaho National Engineering and Environmental Laboratory (INEEL) to the Oak Ridge National Laboratory (ORNL). The shipments described here will be conducted according to applicable regulations of the US Department of Transportation (DOT), US Nuclear Regulatory Commission (NRC), and all applicable DOE Orders. This Irradiated Test Fuel Shipment Plan for the LWR MOX Fuel Irradiation Test Project addresses the shipments of a small number of irradiated test specimen capsules and has been reviewed and agreed to by INEEL and ORNL (as participants in the shipment campaign). Minor refinements to data entries in this plan, such as actual shipment dates, exact quantities and characteristics of materials to be shipped, and final approved shipment routing, will be communicated between the shipper, receiver, and carrier, as needed, using faxes, e-mail, official shipping papers, or other backup documents (e.g., shipment safety evaluations). Any major changes in responsibilities or data beyond refinements of dates and quantities of material will be prepared as additional revisions to this document and will undergo a full review and approval cycle

  17. Preliminary Single-Phase Mixing Test using Wire Mesh System in a wire-wrapped 37-rod Bundle

    International Nuclear Information System (INIS)

    Bae, Hwang; Kim, Hyungmo; Lee, Dong Won; Choi, Hae Seob; Choi, Sun Rock; Chang, Seokkyu; Kim, Seok; Euh, Dongjin; Lee, Hyeongyeon

    2014-01-01

    In this paper, preliminary tests of the wire-mesh sensor are introduced before measuring of mixing coefficient in the wire-wrapped 37-pin fuel assembly for a sodium-cooled fast reactor. Through this preliminary test, it was confirmed that city water can be used as a tracer for demineralized water as a base. A simple test was performed to evaluate the characteristics of a wire mesh with of a short pipe shape. The conductivity of de-mineralized water and city water is linearly increased for the limited temperature ranges as the temperature is increased. The reliability of the wire mesh sensor was estimated based on the averages and standard deviations of the plane image using the cross points. A wire mesh sensor is suitable to apply to a single-phase flow measurement for a mixture with de-mineralized water and city water. A wire mesh sensor and system have been traditionally used to measure the void fraction of a two-phase flow field with gas and liquid. Recently, Ylonen et al. successfully designed and commissioned a measurement system for a single-phase flow using a wire mesh sensor

  18. Water NSTF Design, Instrumentation, and Test Planning

    Energy Technology Data Exchange (ETDEWEB)

    Lisowski, Darius D.; Gerardi, Craig D.; Hu, Rui; Kilsdonk, Dennis J.; Bremer, Nathan C.; Lomperski, Stephen W.; Kraus, Adam R.; Bucknor, Matthew D.; Lv, Qiuping; Farmer, Mitchell T.

    2017-08-01

    The following report serves as a formal introduction to the water-based Natural convection Shutdown heat removal Test Facility (NSTF) program at Argonne. Since 2005, this US Department of Energy (DOE) sponsored program has conducted large scale experimental testing to generate high-quality and traceable validation data for guiding design decisions of the Reactor Cavity Cooling System (RCCS) concept for advanced reactor designs. The most recent facility iteration, and focus of this report, is the operation of a 1/2 scale model of a water-RCCS concept. Several features of the NSTF prototype align with the conceptual design that has been publicly released for the AREVA 625 MWt SC-HTGR. The design of the NSTF also retains all aspects common to a fundamental boiling water thermosiphon, and thus is well poised to provide necessary experimental data to advance basic understanding of natural circulation phenomena and contribute to computer code validation. Overall, the NSTF program operates to support the DOE vision of aiding US vendors in design choices of future reactor concepts, advancing the maturity of codes for licensing, and ultimately developing safe and reliable reactor technologies. In this report, the top-level program objectives, testing requirements, and unique considerations for the water cooled test assembly are discussed, and presented in sufficient depth to support defining the program’s overall scope and purpose. A discussion of the proposed 6-year testing program is then introduced, which outlines the specific strategy and testing plan for facility operations. The proposed testing plan has been developed to meet the toplevel objective of conducting high-quality test operations that span across a broad range of single- and two-phase operating conditions. Details of characterization, baseline test cases, accident scenario, and parametric variations are provided, including discussions of later-stage test cases that examine the influence of geometric

  19. Preliminary sensitivity analyses of corrosion models for BWIP [Basalt Waste Isolation Project] container materials

    International Nuclear Information System (INIS)

    Anantatmula, R.P.

    1984-01-01

    A preliminary sensitivity analysis was performed for the corrosion models developed for Basalt Waste Isolation Project container materials. The models describe corrosion behavior of the candidate container materials (low carbon steel and Fe9Cr1Mo), in various environments that are expected in the vicinity of the waste package, by separate equations. The present sensitivity analysis yields an uncertainty in total uniform corrosion on the basis of assumed uncertainties in the parameters comprising the corrosion equations. Based on the sample scenario and the preliminary corrosion models, the uncertainty in total uniform corrosion of low carbon steel and Fe9Cr1Mo for the 1000 yr containment period are 20% and 15%, respectively. For containment periods ≥ 1000 yr, the uncertainty in corrosion during the post-closure aqueous periods controls the uncertainty in total uniform corrosion for both low carbon steel and Fe9Cr1Mo. The key parameters controlling the corrosion behavior of candidate container materials are temperature, radiation, groundwater species, etc. Tests are planned in the Basalt Waste Isolation Project containment materials test program to determine in detail the sensitivity of corrosion to these parameters. We also plan to expand the sensitivity analysis to include sensitivity coefficients and other parameters in future studies. 6 refs., 3 figs., 9 tabs

  20. Canister disposition plan for the DWPF Startup Test Program

    International Nuclear Information System (INIS)

    Harbour, J.R.; Payne, C.H.

    1990-01-01

    This report details the disposition of canisters and the canistered waste forms produced during the DWPF Startup Test Program. The six melter campaigns (DWPF Startup Tests FA-13, WP-14, WP-15, WP-16, WP-17, and FA-18) will produce 126 canistered waste forms. In addition, up to 20 additional canistered waste forms may be produced from glass poured during the transition between campaigns. In particular, this canister disposition plan (1) assigns (by alpha-numeric code) a specific canister to each location in the six campaign sequences, (2) describes the method of access for glass sampling on each canistered waste form, (3) describes the nature of the specific tests which will be carried out, (4) details which tests will be carried out on each canistered waste form, (5) provides the sequence of these tests for each canistered waste form, and (6) assigns a storage location for each canistered waste form. The tests are designed to provide evidence, as detailed in the Waste Form Compliance Plan (WCP 1 ), that the DWPF product will comply with the Waste Acceptance Product Specifications (WAPS 2 ). The WAPS must be met before the canistered waste form is accepted by DOE for ultimate disposal at the Federal Repository. The results of these tests will be included in the Waste Form Qualification Report (WQR)

  1. Plan for metal barrier selection and testing for NNWSI

    International Nuclear Information System (INIS)

    Halsey, W.G.; McCright, R.D.

    1987-12-01

    The Department of Energy's Nevada Nuclear Waste Storage Investigations (NNWSI) Project is evaluating a site at Yucca Mountain in Nevada as a geological repository for the storage of high-level nuclear waste. The Nuclear Waste Management Projects (NWMP) at Lawrence Livermore National Laboratory (LLNL) has the responsibility for design, testing, and performance analysis of the NNWSI waste packages. One portion of this work is the selection and testing of the material for container construction. The anticipated container design is for this material to be a corrosion resistant metal called the metal barrier. This document is the publication version of the Scientific Investigation Plan (SIP) for the Metal Barrier Selection and Testing Task. The SIP serves as a formal planning document for the investigation and is used to assign quality assurance levels to the activities of the task. This document is an informal version for information distribution and has the sections on ''Schedule and Milestones'' and the ''Quality Assurance Level Assignment Sheets'' removed

  2. Low-level radioactive waste form qualification testing

    International Nuclear Information System (INIS)

    Sohal, M.S.; Akers, D.W.

    1998-06-01

    This report summarizes activities that have already been completed as well as yet to be performed by the Idaho National Engineering and Environmental Laboratory (INEEL) to develop a plan to quantify the behavior of radioactive low-level waste forms. It briefly describes the status of various tasks, including DOE approval of the proposed work, several regulatory and environmental related documents, tests to qualify the waste form, preliminary schedule, and approximate cost. It is anticipated that INEEL and Brookhaven National Laboratory will perform the majority of the tests. For some tests, services of other testing organizations may be used. It should take approximately nine months to provide the final report on the results of tests on a waste form prepared for qualification. It is anticipated that the overall cost of the waste quantifying service is approximately $150,000. The following tests are planned: compression, thermal cycling, irradiation, biodegradation, leaching, immersion, free-standing liquid tests, and full-scale testing

  3. Low-level radioactive waste form qualification testing

    Energy Technology Data Exchange (ETDEWEB)

    Sohal, M.S.; Akers, D.W.

    1998-06-01

    This report summarizes activities that have already been completed as well as yet to be performed by the Idaho National Engineering and Environmental Laboratory (INEEL) to develop a plan to quantify the behavior of radioactive low-level waste forms. It briefly describes the status of various tasks, including DOE approval of the proposed work, several regulatory and environmental related documents, tests to qualify the waste form, preliminary schedule, and approximate cost. It is anticipated that INEEL and Brookhaven National Laboratory will perform the majority of the tests. For some tests, services of other testing organizations may be used. It should take approximately nine months to provide the final report on the results of tests on a waste form prepared for qualification. It is anticipated that the overall cost of the waste quantifying service is approximately $150,000. The following tests are planned: compression, thermal cycling, irradiation, biodegradation, leaching, immersion, free-standing liquid tests, and full-scale testing.

  4. Optimal integration and test plans for software releases of lithographic systems

    NARCIS (Netherlands)

    Boumen, R.; Jong, de I.S.M.; Mortel - Fronczak, van de J.M.; Rooda, J.E.

    2007-01-01

    This paper describes a method to determine the optimal integration and test plan for embedded systems software releases. The method consists of four steps: 1)describe the integration and test problem in an integration and test model which is introduced in this paper, 2) determine possible test

  5. Hydrologic test plans for large-scale, multiple-well tests in support of site characterization at Hanford, Washington

    International Nuclear Information System (INIS)

    Rogers, P.M.; Stone, R.; Lu, A.H.

    1985-01-01

    The Basalt Waste Isolation Project is preparing plans for tests and has begun work on some tests that will provide the data necessary for the hydrogeologic characterization of a site located on a United States government reservation at Hanford, Washington. This site is being considered for the Nation's first geologic repository of high level nuclear waste. Hydrogeologic characterization of this site requires several lines of investigation which include: surface-based small-scale tests, testing performed at depth from an exploratory shaft, geochemistry investigations, regional studies, and site-specific investigations using large-scale, multiple-well hydraulic tests. The large-scale multiple-well tests are planned for several locations in and around the site. These tests are being designed to provide estimates of hydraulic parameter values of the geologic media, chemical properties of the groundwater, and hydrogeologic boundary conditions at a scale appropriate for evaluating repository performance with respect to potential radionuclide transport

  6. Nuclear material control and accountancy planning and performance testing

    International Nuclear Information System (INIS)

    Mike Enhinger; Dennis Wilkey; Rod Martin; Ken Byers; Brian Smith

    1999-01-01

    An overview of performance testing as used at U.S. Department of Energy facilities is provided. Performance tests are performed on specific aspects of the regulations or site policy. The key issues in establishing a performance testing program are: identifying what needs to be tested; determining how to test; establishing criteria to evaluate test results. The program elements of performance testing program consist of: planning; coordination; conduct; evaluation. A performance test may be conducted of personnel or equipment. The DOE orders for nuclear material control and accountancy are divided into three functional areas: program administration, material accounting, and material control. Examples performance tests may be conducted on program administration, accounting, measurement and measurement control, inventory, and containment [ru

  7. Heater test planning for the near surface test facility at the Hanford reservation

    International Nuclear Information System (INIS)

    DuBois, A.; Binnall, E.; Chan, T.; McEvoy, M.; Nelson, P.; Remer, J.

    1979-03-01

    The underground test facility NSTF being constructed at Gable Mountain, is the site for a group of experiments designed to evaluate the thermo-mechanical suitability of a deep basalt stratum as a permanent repository for nuclear waste. Thermo-mechanical modeling was performed to help design the instrumentation arrays for the three proposed heater tests (two full scale tests and one time scale test) and predict the thermal environment of the heaters and instruments. The modeling does not reflect recent RHO revisions to the in situ heater experiment plan. Heaters, instrumentation, and data acquisition system designs and recommendations were adapted from those used in Sweden

  8. Hanford Mission Plan risk-based prioritization methodologies

    International Nuclear Information System (INIS)

    Hesser, W.A.; Madden, M.S.; Pyron, N.M.; Butcher, J.L.

    1994-08-01

    Sites across the US Department (DOE) complex recognize the critical need for a systematic method for prioritizing among their work scope activities. Here at the Hanford Site, Pacific Northwest Laboratory and Westinghouse Hanford Company (WHC) conducted preliminary research into techniques to meet this need and assist managers in making financial resource allocation decisions. This research is a subtask of the risk management task of the Hanford Mission Plan as described in the WHC Integrated Planning Work Breakdown Structure 1.8.2 Fiscal Year 1994 Work Plan. The research team investigated prioritization techniques used at other DOE sites and compared them with the Priority Planning Grid (PPG), a tool used at Hanford. The authors concluded that the PPG could be used for prioritization of resource allocation, but it needed to be revised to better reflect the Site's priorities and objectives. The revised PPG was tested with three Hanford programs, the PPG was modified, and updated procedures were prepared

  9. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  10. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  11. Experimental Test Plan DOE Tidal and River Reference Turbines

    Energy Technology Data Exchange (ETDEWEB)

    Neary, Vincent S [ORNL; Hill, Craig [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Chamorro, Leonardo [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Gunawan, Budi [ORNL

    2012-09-01

    Our aim is to provide details of the experimental test plan for scaled model studies in St. Anthony Falls Laboratory (SAFL) Main Channel at the University of Minnesota, including a review of study objectives, descriptions of the turbine models, the experimental set-up, instrumentation details, instrument measurement uncertainty, anticipated experimental test cases, post-processing methods, and data archiving for model developers.

  12. In vitro preliminary cytotoxicity testing of vegetal extracts, using colorimetric methods

    Directory of Open Access Journals (Sweden)

    Claudia Patricia Cordero Camacho

    2002-01-01

    Full Text Available To advance in the study of the Colombian vegetal biodiversity, considered as a potential source of pharmacologically active products, the establishment of biological activity evaluation systems is necessary, which allow the detection of active products against pathologies with high social and economical impact, such as cancer. This work describes the implementation of a preliminary in vitro methodology for the determination of potential anticancer activity in vegetal extracts, by cytotoxicity testing upon human tumor cell lines, measuring the cellular mass indirectly with the colorimetric assays of MTT (methyl tetrazolium tiazole reduction and SRB (sulforhodamine Bstaining. HT-29, MCF-7, SiHa and HEp-2 cell lines cultures were adapted, MTT concentration, cellular density and treatment period parameters for the cytotoxicity assay were selected. Cell lines sensitivity to the chemotherapeutic agent Doxorubicin HCl was determined. Colombian vegetal species extracts cytotoxicity was tested and usefulness of the assay as a tool to bioguide the search of active products was evidenced.

  13. In vitro preliminary cytotoxicity testing of vegetal extracts, using colorimetric methods

    Directory of Open Access Journals (Sweden)

    Claudia Patricia Cordero Camacho

    2011-12-01

    Full Text Available To advance in the study of the Colombian vegetal biodiversity, considered as a potential source of pharmacologically active products, the establishment of biological activity evaluation systems is necessary, which allow the detection of active products against pathologies with high social and economical impact, such as cancer. This work describes the implementation of a preliminary in vitro methodology for the determination of potential anticancer activity in vegetal extracts, by cytotoxicity testing upon human tumor cell lines, measuring the cellular mass indirectly with the colorimetric assays of MTT (methyl tetrazolium tiazole reduction and SRB (sulforhodamine Bstaining. HT-29, MCF-7, SiHa and HEp-2 cell lines cultures were adapted, MTT concentration, cellular density and treatment period parameters for the cytotoxicity assay were selected. Cell lines sensitivity to the chemotherapeutic agent Doxorubicin HCl was determined. Colombian vegetal species extracts cytotoxicity was tested and usefulness of the assay as a tool to bioguide the search of active products was evidenced.

  14. Preliminary performance test of control rod position indicator for ballscrew type CEDM

    International Nuclear Information System (INIS)

    Yoo, J. Y.; Kim, J. H.; Hu, H.; Lee, J. S.; Kim, J. I.

    2003-01-01

    The reliability and accuracy of the information on control rod position are very important to the reactor safety and the design of the core protection system. A survey on the RSPT(Reed Switch Position Transmitter) type control rod position indication system and its actual implementation in the exiting nuclear power plants in Korea was performed first. The prototype of control rod position indicator having the high performance for the ballscrew type CEDM was developed on the basis of RSPT technology identified through the survey. The characteristics of control rod position indicator was defined and documented through design procedure and preliminary performance test

  15. Cost-effective degradation test plan for a nonlinear random-coefficients model

    International Nuclear Information System (INIS)

    Kim, Seong-Joon; Bae, Suk Joo

    2013-01-01

    The determination of requisite sample size and the inspection schedule considering both testing cost and accuracy has been an important issue in the degradation test. This paper proposes a cost-effective degradation test plan in the context of a nonlinear random-coefficients model, while meeting some precision constraints for failure-time distribution. We introduce a precision measure to quantify the information losses incurred by reducing testing resources. The precision measure is incorporated into time-varying cost functions to reflect real circumstances. We apply a hybrid genetic algorithm to general cost optimization problem with reasonable constraints on the level of testing precision in order to determine a cost-effective inspection scheme. The proposed method is applied to the degradation data of plasma display panels (PDPs) following a bi-exponential degradation model. Finally, sensitivity analysis via simulation is provided to evaluate the robustness of the proposed degradation test plan.

  16. Reflooding Experimental On Beta Test Loop : The Characterisation And Preliminary Experiment

    International Nuclear Information System (INIS)

    Khairul, H.; Antariksawan, Anhar R.; Sumamo, Edy; Kiswanta; Giarno; Joko, P.; H, Ismu

    2001-01-01

    The characterisation and preliminary experiment of reflooding had been conducted. The characteristics of main system and component had been identified completely. From these characteristics the experiment condition was set up : heated rod voltage was 20 volt, frequency,of pump was 19 Hz, flow rate was 1 m3/h. The first of experiment did not show the phenomena of rewetting. Possibly because the heated rod temperature was too low. For the second experiment, the voltage of heated rod was increased to 22 Volt and the flow rate was decreased. The result was that the nucleation boiling on the surfaced of heated rod, was observed during the water re flooded the test section

  17. Test plan for core sampling drill bit temperature monitor

    International Nuclear Information System (INIS)

    Francis, P.M.

    1994-01-01

    At WHC, one of the functions of the Tank Waste Remediation System division is sampling waste tanks to characterize their contents. The push-mode core sampling truck is currently used to take samples of liquid and sludge. Sampling of tanks containing hard salt cake is to be performed with the rotary-mode core sampling system, consisting of the core sample truck, mobile exhauster unit, and ancillary subsystems. When drilling through the salt cake material, friction and heat can be generated in the drill bit. Based upon tank safety reviews, it has been determined that the drill bit temperature must not exceed 180 C, due to the potential reactivity of tank contents at this temperature. Consequently, a drill bit temperature limit of 150 C was established for operation of the core sample truck to have an adequate margin of safety. Unpredictable factors, such as localized heating, cause this buffer to be so great. The most desirable safeguard against exceeding this threshold is bit temperature monitoring . This document describes the recommended plan for testing the prototype of a drill bit temperature monitor developed for core sampling by Sandia National Labs. The device will be tested at their facilities. This test plan documents the tests that Westinghouse Hanford Company considers necessary for effective testing of the system

  18. Statistical analysis and planning of multihundred-watt impact tests

    International Nuclear Information System (INIS)

    Martz, H.F. Jr.; Waterman, M.S.

    1977-10-01

    Modular multihundred-watt (MHW) radioisotope thermoelectric generators (RTG's) are used as a power source for spacecraft. Due to possible environmental contamination by radioactive materials, numerous tests are required to determine and verify the safety of the RTG. There are results available from 27 fueled MHW impact tests regarding hoop failure, fingerprint failure, and fuel failure. Data from the 27 tests are statistically analyzed for relationships that exist between the test design variables and the failure types. Next, these relationships are used to develop a statistical procedure for planning and conducting either future MHW impact tests or similar tests on other RTG fuel sources. Finally, some conclusions are given

  19. AZ-101 Mixer Pump Demonstration and Tests Data Management Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    DOUGLAS, D.G.

    2000-02-22

    This document provides a plan for the analysis of the data collected during the AZ-101 Mixer Pump Demonstration and Tests. This document was prepared after a review of the AZ-101 Mixer Pump Test Plan (Revision 4) [1] and other materials. The plan emphasizes a structured and well-ordered approach towards handling and examining the data. This plan presumes that the data will be collected and organized into a unified body of data, well annotated and bearing the date and time of each record. The analysis of this data will follow a methodical series of steps that are focused on well-defined objectives. Section 2 of this plan describes how the data analysis will proceed from the real-time monitoring of some of the key sensor data to the final analysis of the three-dimensional distribution of suspended solids. This section also identifies the various sensors or sensor systems and associates them with the various functions they serve during the test program. Section 3 provides an overview of the objectives of the AZ-101 test program and describes the data that will be analyzed to support that test. The objectives are: (1) to demonstrate that the mixer pumps can be operated within the operating requirements; (2) to demonstrate that the mixer pumps can mobilize the sludge in sufficient quantities to provide feed to the private contractor facility, and (3) to determine if the in-tank instrumentation is sufficient to monitor sludge mobilization and mixer pump operation. Section 3 also describes the interim analysis that organizes the data during the test, so the analysis can be more readily accomplished. Section 4 describes the spatial orientation of the various sensors in the tank. This section is useful in visualizing the relationship of the Sensors in terms of their location in the tank and how the data from these sensors may be related to the data from other sensors. Section 5 provides a summary of the various analyses that will be performed on the data during the test

  20. AZ-101 Mixer Pump Demonstration and Tests: Data Management (Analysis) Plan

    International Nuclear Information System (INIS)

    DOUGLAS, D.G.

    2000-01-01

    This document provides a plan for the analysis of the data collected during the AZ-101 Mixer Pump Demonstration and Tests. This document was prepared after a review of the AZ-101 Mixer Pump Test Plan (Revision 4) [1] and other materials. The plan emphasizes a structured and well-ordered approach towards handling and examining the data. This plan presumes that the data will be collected and organized into a unified body of data, well annotated and bearing the date and time of each record. The analysis of this data will follow a methodical series of steps that are focused on well-defined objectives. Section 2 of this plan describes how the data analysis will proceed from the real-time monitoring of some of the key sensor data to the final analysis of the three-dimensional distribution of suspended solids. This section also identifies the various sensors or sensor systems and associates them with the various functions they serve during the test program. Section 3 provides an overview of the objectives of the AZ-101 test program and describes the data that will be analyzed to support that test. The objectives are: (1) to demonstrate that the mixer pumps can be operated within the operating requirements; (2) to demonstrate that the mixer pumps can mobilize the sludge in sufficient quantities to provide feed to the private contractor facility, and (3) to determine if the in-tank instrumentation is sufficient to monitor sludge mobilization and mixer pump operation. Section 3 also describes the interim analysis that organizes the data during the test, so the analysis can be more readily accomplished. Section 4 describes the spatial orientation of the various sensors in the tank. This section is useful in visualizing the relationship of the Sensors in terms of their location in the tank and how the data from these sensors may be related to the data from other sensors. Section 5 provides a summary of the various analyses that will be performed on the data during the test

  1. The Unified Language Testing Plan: Speaking Proficiency Test. Spanish and English Pilot Validation Studies. Report Number 1.

    Science.gov (United States)

    Thornton, Julie A.

    This report describes one segment of the Federal Language Testing Board's Unified Language Testing Plan (ULTP), the validation of speaking proficiency tests in Spanish and English. The ULTP is a project to increase standardization of foreign language proficiency measurement and promote sharing of resources among testing programs in the federal…

  2. Evaluation of high pressure Freon decontamination. I. Preliminary tests

    International Nuclear Information System (INIS)

    Rankin, W.N.

    1983-01-01

    High-pressure Freon blasting techniques are being evaluated for applications involving the removal of non-adherent radioactive particulate contamination at SRP. Very little waste is generated by this technique because the used Freon can be easily distilled and reused. One of the principle advantages of this technique is that decontaminated electrical equipment can be returned to service immediately without drying, unlike high-pressure water blasting techniques. Preliminary scoutin tests evaluating high-pressure Freon blasting for decontamination at SRP were carried out at Quadrex Co., Oak Ridge, TN, October 12 and 13. DWPF-type contamination (raw sludge plus volatiles) and separations area-type contamination (diluted boiling point (47.6 0 C) allow it to rapidly separate from higher boiling contaminants via distillation with filtration to remove particulate material, and distillation with condensation, the solvent may be recovered for indefinite reuse while reducing the radioactive waste to a minimum. 3 references, 5 figures, 6 tables

  3. Preliminary results for HIP bonding Ta to W targets for the materials test station

    Energy Technology Data Exchange (ETDEWEB)

    Dombrowski, David E [Los Alamos National Laboratory; Maloy, Stuart A [Los Alamos National Laboratory

    2009-01-01

    Tungsten targets for the Materials Test Station (MTS) were clad with thin tantalum cover plates and a tantalum frame using hot isostatic pressing (HIP). A preliminary HIP parameter study showed good bonding and intimate mechanical contact for Ta cover plate thicknesses of 0.25 mm (0.010 inch) and 0.38 mm (0.015 inch). HIP temperatures of full HIP runs were 1500 C (2732 F). HIP pressure was 203 MPa (30 ksi).

  4. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Environmental Monitoring Plan applies to the US Department of Energy's (DOE's) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this Environmental Monitoring Plan brings together in one document a description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA). The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards

  5. Preliminary tests of the electrostatic plasma accelerator

    Science.gov (United States)

    Aston, G.; Acker, T.

    1990-01-01

    This report describes the results of a program to verify an electrostatic plasma acceleration concept and to identify those parameters most important in optimizing an Electrostatic Plasma Accelerator (EPA) thruster based upon this thrust mechanism. Preliminary performance measurements of thrust, specific impulse and efficiency were obtained using a unique plasma exhaust momentum probe. Reliable EPA thruster operation was achieved using one power supply.

  6. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  7. Current status of VEGA program and a preliminary test with cesium iodide

    International Nuclear Information System (INIS)

    Hidaka, A.; Nakamura, T.; Kudo, T.; Hayashida, R.; Nakamura, J.; Otomo, T.; Uetsuka, H.

    2000-01-01

    The VEGA program has been performed at JAERI to clarify the mechanism of FP release from irradiated PWR/BWR fuels including MOX fuel and to improve predictability of the source term. The principal purposes are to investigate the release of actinides and FPs including non-volatile radionuclides from irradiated fuel at 3000degC under high pressure condition up to 1.0 MPa. The short-life radionuclides will be accumulated by re-irradiation of test fuel just before the experiment using the JAERI's research reactor such as JRR-3 or NSRR. The test facility was installed into the beta/gamma concrete No.5 cell at RFEF and completed in February, 1999. Before the first VEGA-1 test in September, 1999, a preliminary test using a cold simulant, cesium iodide (CsI) was performed to confirm the fundamental capabilities of the test facility. The test results showed that the trapping efficiency of the aerosol filters is about 98%. The amount of CsI which arrived at the downstream pipe of the filters was quite small while a small amount of I 2 gas which can pass through the filters was condensed just before the cold condenser as expected in the design. (author)

  8. Proper project planning helps minimize overruns and delays

    International Nuclear Information System (INIS)

    Donnelly, G.; Cooney, D.J.

    1994-01-01

    This paper describes planning methods to help minimize cost overruns during the construction of oil and gas pipelines. These steps include background data collection methods, field surveys, determining preliminary pipeline routes, regulatory agency pre-application meetings, and preliminary engineering. Methods for planning also include preliminary aerial mapping, biological assessments, cultural resources investigations, wetlands delineation, geotechnical investigations, and environmental audits. Identification of potential problems can allow for rerouting of the pipeline or remediation processes before they are raised during the permitting process. By coordinating these events from the very beginning, significant cost savings will result that prevent having to rebudget for them after the permitting process starts

  9. Test plan for K-Basin fuel handling tools

    International Nuclear Information System (INIS)

    Bridges, A.E.

    1995-01-01

    The purpose of this document is to provide the test plan and procedures for the acceptance testing of the handling tools enveloped for the removal of an N-Reactor fuel element from its storage canister in the K-Basins storage pool and insertion into the Single fuel Element Can for subsequent shipment to a Hot Cell for examination. Examination of these N-Reactor fuel elements is part of the overall characterization effort. New hand tools were required since previous fuel movement has involved grasping the fuel in a horizontal position. The 305 Building Cold Test Facility will be used to conduct the acceptance testing of the Fuel Handling Tools. Upon completion of this acceptance testing and any subsequent training of operators, the tools will be transferred to the 105 KW Basin for installation and use

  10. Test plan: Gas-threshold-pressure testing of the Salado Formation in the WIPP underground facility

    International Nuclear Information System (INIS)

    Saulnier, G.J. Jr.

    1992-03-01

    Performance assessment for the disposal of radioactive waste from the United States defense program in the WIPP underground facility must assess the role of post-closure was generation by waste degradation and the subsequent pressurization of the facility. be assimilated by the host formation will Whether or not the generated gas can be assimilated by the host formation will determine the ability of the gas to reach or exceed lithostatic pressure within the repository. The purpose of this test plan is (1) to present a test design to obtain realistic estimates of gas-threshold pressure for the Salado Formation WIPP underground facility including parts of the formation disturbed by the underground of the Salado, and (2) to provide a excavations and in the far-field or undisturbed part framework for changes and amendments to test objectives, practices, and procedures. Because in situ determinations of gas-threshold pressure in low-permeability media are not standard practice, the methods recommended in this testplan are adapted from permeability-testing and hydrofracture procedures. Therefore, as the gas-threshold-pressure testing program progresses, personnel assigned to the program and outside observers and reviewers will be asked for comments regarding the testing procedures. New and/or improved test procedures will be documented as amendments to this test plan, and subject to similar review procedures

  11. Preliminary definition of the remote handling system for the current IFMIF Test Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Queral, V., E-mail: vicentemanuel.queral@ciemat.es [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Urbon, J. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Instituto de Fusion Nuclear, Universidad Politecnica de Madrid, 28006 Madrid (Spain); Garcia, A.; Cuarental, I.; Mota, F. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Micciche, G. [CR ENEA Brasimone, I-40035 Camugnano (BO) (Italy); Ibarra, A. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Rapisarda, D. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Instituto de Fusion Nuclear, Universidad Politecnica de Madrid, 28006 Madrid (Spain); Casal, N. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain)

    2011-10-15

    A coherent design of the remote handling system with the design of the components to be manipulated is vital for reliable, safe and fast maintenance, having a decisive impact on availability, occupational exposures and operational cost of the facility. Highly activated components in the IFMIF facility are found at the Test Cell, a shielded pit where the samples are accurately located. The remote handling system for the Test Cell reference design was outlined in some past IFMIF studies. Currently a new preliminary design of the Test Cell in the IFMIF facility is being developed, introducing important modifications with respect to the reference one. This recent design separates the previous Vertical Test Assemblies in three functional components: Test Modules, shielding plugs and conduits. Therefore, it is necessary to adapt the previous design of the remote handling system to the new maintenance procedures and requirements. This paper summarises such modifications of the remote handling system, in particular the assessment of the feasibility of a modified commercial multirope crane for the handling of the weighty shielding plugs for the new Test Cell and a quasi-commercial grapple for the handling of the new Test Modules.

  12. Preliminary definition of the remote handling system for the current IFMIF Test Facilities

    International Nuclear Information System (INIS)

    Queral, V.; Urbon, J.; Garcia, A.; Cuarental, I.; Mota, F.; Micciche, G.; Ibarra, A.; Rapisarda, D.; Casal, N.

    2011-01-01

    A coherent design of the remote handling system with the design of the components to be manipulated is vital for reliable, safe and fast maintenance, having a decisive impact on availability, occupational exposures and operational cost of the facility. Highly activated components in the IFMIF facility are found at the Test Cell, a shielded pit where the samples are accurately located. The remote handling system for the Test Cell reference design was outlined in some past IFMIF studies. Currently a new preliminary design of the Test Cell in the IFMIF facility is being developed, introducing important modifications with respect to the reference one. This recent design separates the previous Vertical Test Assemblies in three functional components: Test Modules, shielding plugs and conduits. Therefore, it is necessary to adapt the previous design of the remote handling system to the new maintenance procedures and requirements. This paper summarises such modifications of the remote handling system, in particular the assessment of the feasibility of a modified commercial multirope crane for the handling of the weighty shielding plugs for the new Test Cell and a quasi-commercial grapple for the handling of the new Test Modules.

  13. Minnesota urban partnership agreement national evaluation : telecommuting test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the telecommuting test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing str...

  14. WE-DE-201-04: Cross Validation of Knowledge-Based Treatment Planning for Prostate LDR Brachytherapy Using Principle Component Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Roper, J; Ghavidel, B; Godette, K; Schreibmann, E [Winship Cancer Institute of Emory University, GA (United States); Chanyavanich, V [Rocky Mountain Cancer Centers, CO (United States)

    2016-06-15

    Purpose: To validate a knowledge-based algorithm for prostate LDR brachytherapy treatment planning. Methods: A dataset of 100 cases was compiled from an active prostate seed implant service. Cases were randomized into 10 subsets. For each subset, the 90 remaining library cases were registered to a common reference frame and then characterized on a point by point basis using principle component analysis (PCA). Each test case was converted to PCA vectors using the same process and compared with each library case using a Mahalanobis distance to evaluate similarity. Rank order PCA scores were used to select the best-matched library case. The seed arrangement was extracted from the best-matched case and used as a starting point for planning the test case. Any subsequent modifications were recorded that required input from a treatment planner to achieve V100>95%, V150<60%, V200<20%. To simulate operating-room planning constraints, seed activity was held constant, and the seed count could not increase. Results: The computational time required to register test-case contours and evaluate PCA similarity across the library was 10s. Preliminary analysis of 2 subsets shows that 9 of 20 test cases did not require any seed modifications to obtain an acceptable plan. Five test cases required fewer than 10 seed modifications or a grid shift. Another 5 test cases required approximately 20 seed modifications. An acceptable plan was not achieved for 1 outlier, which was substantially larger than its best match. Modifications took between 5s and 6min. Conclusion: A knowledge-based treatment planning algorithm for prostate LDR brachytherapy is being cross validated using 100 prior cases. Preliminary results suggest that for this size library, acceptable plans can be achieved without planner input in about half of the cases while varying amounts of planner input are needed in remaining cases. Computational time and planning time are compatible with clinical practice.

  15. Characteristics of HTTR's startup physics tests

    International Nuclear Information System (INIS)

    Nojiri, N.; Nakano, M.; Takeuchi, M.; Pohl, P.; Yamashita, K.

    1997-01-01

    The High Temperature Engineering Test Reactor (HTTR) which is under construction by Japan Atomic Energy Research Institute (JAERI) is a graphite-moderated and helium gas-cooled reactor with an outlet temperature of 950 deg. C and a thermal output of 30MW. The first criticality is expected at the end of October 1997. The start-up physics tests (SPTs) are planned in the period from mid 1997 to the end of 1998. Characteristic items of the SPTs are: 1) Criticality approach; 2) Tests on a preliminary annual core; 3) Measurement of scram reactivity; 4) Excess reactivity test; 5) Measurements along with a 2-step-scram reactor shutdown procedure. (author)

  16. Minnesota urban partnership agreement national evaluation : tolling test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the test plan for collecting and analyzing toll data for the Minnesota Urban Partnership : Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The : Minnesota UPA projects focus on reducin...

  17. Preliminary Design Progress of the HCCR TBM for ITER testing

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Won; Park, Sung Dae; Kim, Dong Jun; Jin, Hyung Gon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Ahn, Mu-Young [National Fusion Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Korea has designed a helium cooled ceramic reflector (HCCR) test blanket module (TBM) including the TBM-shield, which is called the TBM-set, to be tested in ITER, a Nuclear Facility INB-174. Through the conceptual design review (CDR), its design integrity was successfully demonstrated at the conceptual design level at various loads. After CD approval, preliminary design (PD) was started and the progress is introduced in the present study. After PD review and approval, final design and then fabrication will be started. The main purpose of PD is to design the TBM-set according to the fabrication aspect and more detailed design for interfaces with ITER machine, such as installed TBM port plug and frame. With these considering, PD of TBM-set was started. PD for HCCR TBM has been performed (so far v0.24) from the CD model. FW, BZ, SW, TES/NAS, BM, and connecting support design were performed through the analyses, if necessary. The manufacturability was the main concern for PD model development. Thermal hydraulic analysis will be performed to evaluate the temperature and pressure drop in TBM-set. The structural integrity of TBM-set will be confirmed with combined various loads condition.

  18. Georgetown University Integrated Community Energy System (GU-ICES). Phase III, Stage II. Preliminary design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-01

    Results are presented for two elements in the Georgetown University ICES program - the installation of a 2500-kW backpressure steam-turbine generator within a new extension to the heating and cooling plant (cogeneration) and the provision of four additional ash silos for the university's atmospheric fluidized-bed boiler plant (added storage scheme). The preliminary design and supporting documentation for the work items and architectural drawings are presented. Section 1 discusses the basis for the report, followed by sections on: feasibility analysis update; preliminary design documents; instrumentation and testing; revised work management plan; and appendices including outline constructions, turbine-generator prepurchase specification, design calculations, cost estimates, and Potomac Electric Company data. (MCW)

  19. Updated FY12 Ceramic Fuels Irradiation Test Plan

    International Nuclear Information System (INIS)

    Nelson, Andrew T.

    2012-01-01

    The Fuel Cycle Research and Development program is currently devoting resources to study of numerous fuel types with the aim of furthering understanding applicable to a range of reactors and fuel cycles. In FY11, effort within the ceramic fuels campaign focused on planning and preparation for a series of rabbit irradiations to be conducted at the High Flux Isotope Reactor located at Oak Ridge National Laboratory. The emphasis of these planned tests was to study the evolution of thermal conductivity in uranium dioxide and derivative compositions as a function of damage induced by neutron damage. Current fiscal realities have resulted in a scenario where completion of the planned rabbit irradiations is unlikely. Possibilities for execution of irradiation testing within the ceramic fuels campaign in the next several years will thus likely be restricted to avenues where strong synergies exist both within and outside the Fuel Cycle Research and Development program. Opportunities to augment the interests and needs of modeling, advanced characterization, and other campaigns present the most likely avenues for further work. These possibilities will be pursued with the hope of securing future funding. Utilization of synthetic microstructures prepared to better understand the most relevant actors encountered during irradiation of ceramic fuels thus represents the ceramic fuel campaign's most efficient means to enhance understanding of fuel response to burnup. This approach offers many of the favorable attributes embraced by the Separate Effects Testing paradigm, namely production of samples suitable to study specific, isolated phenomena. The recent success of xenon-imbedded thick films is representative of this approach. In the coming years, this strategy will be expanded to address a wider range of problems in conjunction with use of national user facilities novel characterization techniques to best utilize programmatic resources to support a science-based research program.

  20. Specification and acceptance testing of radiotherapy treatment planning systems

    International Nuclear Information System (INIS)

    2007-04-01

    Quality assurance (QA) in the radiation therapy treatment planning process is essential to ensure accurate dose delivery to the patient and to minimize the possibility of accidental exposure. The computerized radiotherapy treatment planning systems (RTPSs) are now widely available in industrialized and developing countries and it is of special importance to support hospitals in Member States in developing procedures for acceptance testing, commissioning and QA of their RTPSs. Responding to these needs, a group of experts developed an IAEA publication with such recommendations, which was published in 2004 as IAEA Technical Reports Series No. 430. This report provides a general framework and describes a large number of tests and procedures that should be considered by the users of new RTPSs. However, small hospitals with limited resources or large hospitals with high patient load and limited staff are not always able to perform complete characterization, validation and software testing of algorithms used in RTPSs. Therefore, the IAEA proposed more specific guidelines that provide a step-by-step recommendation for users at hospitals or cancer centres how to implement acceptance and commissioning procedures for newly purchased RTPSs. The current publication was developed in the framework of the Coordinated Research Project on Development of Procedures for Quality Assurance for Dosimetry Calculations in Radiotherapy and uses the International Electrotechnical Commission (IEC) standard IEC 62083, Requirements for the Safety of Radiotherapy Treatment Planning Systems as its basis. The report addresses the procedures for specification and acceptance testing of RTPSs to be used by both manufacturers and users at the hospitals. Recommendations are provided for specific tests to be performed at the manufacturing facility known as type tests, and for acceptance tests to be performed at the hospital known as site tests. The purpose of acceptance testing is to demonstrate to the

  1. A Test of Motor (Not Executive) Planning in Developmental Coordination Disorder and Autism

    NARCIS (Netherlands)

    van Swieten, Lisa M.; van Bergen, Elsje; Williams, Justin H G; Wilson, Andrew D.; Plumb, Mandy S.; Kent, Samuel W.; Mon-Williams, Mark A.

    Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between motor and executive planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or

  2. A test of motor (not executive) planning in developmental coordination disorder and autism

    NARCIS (Netherlands)

    van Swieten, L.M.; van Bergen, E.; Williams, J.H.G.; Wilson, A.D.; Plumb, M.S.; Kent, S.W.; Mon-Williams, M.A.

    2010-01-01

    Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between motor and executive planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or

  3. Sustainable land use planning at the Semipalatinsk Nuclear Test Site

    International Nuclear Information System (INIS)

    Coughtrey, P.J.; Ridgway, R.B.; Baumann, P.

    2001-01-01

    Full text: The UK Department for International Development (DFID) has recently agreed to support a project to develop a participatory sustainable land use plan for areas affected by nuclear weapons testing at Semipalatinsk. This three year project is expected to be initiated in April 2001 and will form one component of the United Nations Development Programme (UNDP) Semipalatinsk Rehabilitation Programme. The project will be undertaken by a combination of Kazakh organizations working with UK consultants and will meet its overall aim through the following main activities: Development of institutional capacity in data management and analysis; Provision of information and education on environmental contamination, hazards and risks; Development of a participatory land use planning process and piloting of the process in specific areas and communities around the test site; Integration of mineral resource extraction in the land planning process with a focus- on water resource and environmental protection and participatory approaches to resolving land use conflicts; Development of legislative tools to permit the implementation of environmental management of resource exploitation. The project will make use of both modern satellite-based imagery and more traditional methods to determine the potential for different land uses within the test site. The results obtained will be incorporated with additional information on land use. radiological and hydrological conditions at the test site through a geographical information system (GIS) provided by the project. The GIS will form the core component for collation and distribution of information on options available for use of different areas of the test site and its vicinity. A participatory rural appraisal, using tried and tested techniques, will identify local interest groups in land use planning and identify the details of their stake in the process. The groups will include owners-herders, employee-herders, and subsistence

  4. Implications of the timing of the preliminary determination of suitability

    International Nuclear Information System (INIS)

    Cotton, T.A.

    1986-01-01

    The Nuclear Waste Policy Act of 1982 requires that the Enviromental Impact Statement prepared for the recommendation of a repository site must consider three sites -- the one selected for the repository and at least two alternatives. All of these sites must have been characterized, and the Secretary of Energy must have made a preliminary determination that each is suitable for development as a repository. There is great disagreement about whether that ''preliminary determination of suitability'' is to be made before or after site characterization. If the Act is interpreted as requiring the determination to be made after characterization is completed, DOE cannot recommend the first site for licensing until it has three sites that appear suitable after full characterization; if the determination can be made before characterization, DOE can proceed to licensing even if only one site survives characterization. While DOE plans to make the preliminary determination before starting characterization, the uncertainty about how a court might ultimately interpret the Act injects a significant institutional uncertainty into the schedule for the repository, and complicates contingency planning for the siting process. Early resolution of the interpretation would greatly aid DOE's planning for the siting program

  5. Preliminary Flight Results of the Microelectronics and Photonics Test Bed: NASA DR1773 Fiber Optic Data Bus Experiment

    Science.gov (United States)

    Jackson, George L.; LaBel, Kenneth A.; Marshall, Cheryl; Barth, Janet; Seidleck, Christina; Marshall, Paul

    1998-01-01

    NASA Goddard Spare Flight Center's (GSFC) Dual Rate 1773 (DR1773) Experiment on the Microelectronic and Photonic Test Bed (MPTB) has provided valuable information on the performance of the AS 1773 fiber optic data bus in the space radiation environment. Correlation of preliminary experiment data to ground based radiation test results show the AS 1773 bus is employable in future spacecraft applications requiring radiation tolerant communication links.

  6. In situ gas treatment technology demonstration test plan

    International Nuclear Information System (INIS)

    Thornton, E.C.; Miller, R.D.

    1996-01-01

    This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities

  7. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Cox, D. H.

    2000-01-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved

  8. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. H. Cox

    2000-07-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved.

  9. Radioactive waste isolation in salt: Peer review of the Golder Associates draft test plan for in situ testing in an exploratory shaft in salt

    International Nuclear Information System (INIS)

    Hambley, D.F.; Mraz, D.Z.; Unterberter, R.R.

    1987-01-01

    This report documents the peer review conducted by Argonne National Laboratory of a document entitled ''Draft Test Plan for In Situ Testing in an Exploratory Shaft in Salt,'' prepared for Battelle Memorial Institute's Office of Nuclear Waste Isolation by Golder Associates, Inc. In general, the peer review panelists found the test plan to be technically sound, although some deficiencies were identified. Recommendations for improving the test plan are presented in this review report. A microfiche copy of the following unpublished report is attached to the inside back cover of this report: ''Draft Test Plan for In Situ Testing in an Exploratory Shaft in Salt,'' prepared by Golder Associates, Inc., for Office of Nuclear Waste Isolation, Battelle Memorial Institute, Columbus, Ohio (March 1985)

  10. Evaluation tests of treatment planning systems concerning 3D dose calculation

    International Nuclear Information System (INIS)

    Simonian-Sauve, M.; Smart, C.

    1998-01-01

    The development of irradiation techniques in radiotherapy shows a clear tendency towards the systematic use of three-dimensional (3D) information. Great efforts are being made to set up 3D conformal radiotherapy. Consequently, in the aim of greater coherence and accuracy, 'the dosimetric tool' must also meet the requirements of 3D radiotherapy, as it plays a role in the treatment chain. To know if the treatment planning system is a '3D', '2D', or even '1D' system, one should not be satisfied with reading the technical documentation and the program algorithm description not entirely trust the constructor's assertions. It is essential to clearly and precisely evaluate the possibilities of the treatment planning system. Even if it is proved not to satisfy perfectly all the tests which would qualify it as a real 3D calculation system, the study of the test results helps to give clear explanations of the dosimetric results. Two series of test cases are proposed. The first series allows us to understand in which conditions the treatment planning system takes into account the scatter influence in a volume. The second series is designed to inform us about the capacity of the dose calculation algorithm when the medium encloses non-homogeneities. These test cases do not constitute an exhaustive 'check-list' able to tackle completely the question of 3D calculation. They are submitted as examples and should be considered as an evaluation methodology for the software implanted in the treatment planning system. (authors)

  11. Evaluation of the radionuclide tracer test conducted at the project Gnome Underground Nuclear Test Site, New Mexico

    International Nuclear Information System (INIS)

    Pohll, G.; Pohlmann, K.

    1996-08-01

    A radionuclide tracer test was conducted in 1963 by the U.S. Geological Survey at the Project Gnome underground nuclear test site, approximately 40 km southeast of Carlsbad, New Mexico. The tracer study was carried out under the auspices of the U.S. Atomic Energy Commission (AEC) to study the transport behavior of radionuclides in fractured rock aquifers. The Culebra Dolomite was chosen for the test because it was considered to be a reasonable analogue of the fractured carbonate aquifer at the Nevada Test Site (NTS), the principal location of U.S. underground nuclear tests. Project Gnome was one of a small number of underground nuclear tests conducted by the AEC at sites distant from the NTS. The Gnome device was detonated on December 10, 1961 in an evaporate unit at a depth of 360 m below ground surface. Recently, the U.S. Department of Energy (DOE) implemented an environmental restoration program to characterize, remediate, and close these offsite nuclear test areas. An early step in this process is performance of a preliminary risk analysis of the hazard posed by each site. The Desert Research Institute has performed preliminary hydrologic risk evaluations for the groundwater transport pathway at Gnome. That evaluation included the radioactive tracer test as a possible source because the test introduced radionuclides directly into the Culebra Dolomite, which is the only aquifer at the site. This report presents a preliminary evaluation of the radionuclide tracer test as a source for radionuclide migration in the Culebra Dolomite. The results of this study will assist in planning site characterization activities and refining estimates of the radionuclide source for comprehensive models of groundwater transport st the Gnome site

  12. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    Science.gov (United States)

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  13. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    Science.gov (United States)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  14. Performance of Small Bore 60NiTi Hybrid Ball Bearings: Preliminary Life Test Results

    Science.gov (United States)

    Dellacorte, Christopher; Howard, S. Adam

    2016-01-01

    Small bore (R8 size) hybrid ball bearings made with 60NiTi races and silicon nitride balls are under development for highly corrosive aerospace applications that are also exposed to heavy static (shock) loads. The target application is the vacuum pump used inside the wastewater recycling system on the International Space Station. To verify bearing longevity, life tests are run at 2000rpm for time periods up to 5000 hours. Accelerometers with data tracking are used to monitor operation and the bearings are disassembled and inspected at intervals to assess wear. Preliminary tests show that bearings made from 60NiTi are feasible for this aerospace and potentially other industrial applications that must endure similar operating environments.

  15. Requirements, needs, and concepts for a new broad-application test reactor

    International Nuclear Information System (INIS)

    Ryskamp, J.M.; Fletcher, C.D.; Denison, A.B.; Liebenthal, J.L.

    1992-01-01

    For a variety of reasons, including (a) the increasing demands of the 1990s regulatory environment, (b) limited existing test capactiy and capability to satisfy projected future testing missions, and (c) an expected increasing need for nuclear information to support development of advanced reactors, there is a need for requirements and preliminary concepts for a new broad-application test reactor (BATR). These requirements must include consideration not only for a broad range of projected testing missions but also for current and projected regulatory compliance and safety requirements. The requirements will form the basis for development and assessment of preconceptual reactor designs and lead to the identification of key technologies to support the government's long-term strategic and programmatic planning. This paper outlines the need for a new BATR and suggests a few preliminary reactor concepts that can meet that need

  16. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1997-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation

  17. An Overview of the NASA Aeronautics Test Program Strategic Plan

    Science.gov (United States)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced

  18. C-018H LERF filtration test plan. Revision 1

    International Nuclear Information System (INIS)

    Moberg, T.P.; King, C.V.

    1994-01-01

    The following outlines the plan to test the polymeric backwash filtration system at the LERF. These tests will determine if the ETF filter design is adequate. If the tests show that the design is adequate, the task will be complete. If the tests show that the technology is inadequate, it may be necessary to perform further tests to qualify other candidate filtration technologies (e.g., polymeric tubular ultrafiltration, centrifugal ultrafiltration). The criteria to determine the success or failure of the backwash filter will be based on the system's ability to remove the bacteria and inorganic contaminants from the evaporator process condensate. The tests are designed to qualify the design basis of the filtration technology that will be used in the ETF

  19. C-018H LERF filtration test plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Moberg, T.P.; King, C.V.

    1994-08-26

    The following outlines the plan to test the polymeric backwash filtration system at the LERF. These tests will determine if the ETF filter design is adequate. If the tests show that the design is adequate, the task will be complete. If the tests show that the technology is inadequate, it may be necessary to perform further tests to qualify other candidate filtration technologies (e.g., polymeric tubular ultrafiltration, centrifugal ultrafiltration). The criteria to determine the success or failure of the backwash filter will be based on the system`s ability to remove the bacteria and inorganic contaminants from the evaporator process condensate. The tests are designed to qualify the design basis of the filtration technology that will be used in the ETF.

  20. A Preliminary Analysis for SMART-ITL SBLOCA Tests using the MARS/KS Code

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Yeon Sik; Ko, Yung Joo; Suh, Jae Seung [System Engineering and Technology Co., Ltd., Daejeon (Korea, Republic of)

    2013-10-15

    In this paper, a preliminary analysis was conducted for SMART-ITL SBLOCA tests using the MARS/KS Code. The results of this work are expected to be good guidelines for SBLOCA tests with the SMART-ITL, and used to understand the various thermal-hydraulic phenomena expected to occur in the integral-type reactor, SMART. An integral-effect test (IET) loop for SMART, SMART-ITL (or FESTA), has been designed using a volume scaling methodology. It was installed at KAERI and its commissioning tests were finished in 2012. Its height was preserved and its area and volume were scaled down to 1/49 compared with the prototype plant, SMART. The SMART-ITL consists of a primary system including a reactor pressure vessel with a pressurizer, four steam generators and four main coolant pumps, a secondary system, a safety system, and an auxiliary system. The objectives of IET using the SMART-ITL facility are to investigate the integral performance of the inter-connected components and possible thermal-hydraulic phenomena occurring in the SMART design, and to validate its safety for various design basis events (DBAs)

  1. A Preliminary Analysis for SMART-ITL SBLOCA Tests using the MARS/KS Code

    International Nuclear Information System (INIS)

    Cho, Yeon Sik; Ko, Yung Joo; Suh, Jae Seung

    2013-01-01

    In this paper, a preliminary analysis was conducted for SMART-ITL SBLOCA tests using the MARS/KS Code. The results of this work are expected to be good guidelines for SBLOCA tests with the SMART-ITL, and used to understand the various thermal-hydraulic phenomena expected to occur in the integral-type reactor, SMART. An integral-effect test (IET) loop for SMART, SMART-ITL (or FESTA), has been designed using a volume scaling methodology. It was installed at KAERI and its commissioning tests were finished in 2012. Its height was preserved and its area and volume were scaled down to 1/49 compared with the prototype plant, SMART. The SMART-ITL consists of a primary system including a reactor pressure vessel with a pressurizer, four steam generators and four main coolant pumps, a secondary system, a safety system, and an auxiliary system. The objectives of IET using the SMART-ITL facility are to investigate the integral performance of the inter-connected components and possible thermal-hydraulic phenomena occurring in the SMART design, and to validate its safety for various design basis events (DBAs)

  2. MEGAPIE-TEST: A European Project on Spallation Target Testing

    International Nuclear Information System (INIS)

    Knebel, Joachim U.; Klein, Jean-Christophe; Gorse, Dominique; Agostini, Pietro; Groeschel, Friedrich; Kupschus, Peter; Kirchner, Thomas; Vogt, Jean-Bernard

    2002-01-01

    Within the Euratom 5. Framework Programme (5FP) the European Commission is funding the MEGAPIE-TEST Project (Megawatt Pilot Experiment - Testing) over a period of three years, starting in September 2001. The project is combining the efforts of 8 main associations. MEGAPIE is a liquid metal spallation target of 1 MW of beam power. The main results of the MEGAPIE-TEST project will be: Development and comprehensive testing of a liquid metal spallation target both under beam-off and beam-on conditions, and the set up of a handbook on the design of a neutron spallation source in general. The operation of MEGAPIE within the accelerator complex SINQ at Paul Scherrer Institute (PSI), Switzerland, is envisaged in 2004. MEGAPIE is a first decisive step to realize a liquid metal spallation target in Europe. This report is giving an overview of the MEGAPIE-TEST Project, the overall work plan, and preliminary results from the design support and validation, which form an important basis for the project. (authors)

  3. In Situ Vitrification Engineering-Scale Test ES-INEL-4, ES-INEL-5, ES-INEL-6, and ES-INEL-7 Test Plan

    International Nuclear Information System (INIS)

    Weidner, J.R.; Stoots, P.R.

    1990-10-01

    The In Situ Vitrification Engineering-Scale Tests ES-4, ES-5, ES-6, and ES-7 Product Characterization Test Plan describes the methods and procedures to be used or the physical and chemical characterization of the solid product(s) resulting from the Idaho National Engineering Laboratory engineering scale in situ vitrification tests ES-4, ES-5, ES-6, and ES-7. The goals of this Test Plan are to insure that the product characterization results are sufficient to meet the data needs of the In Situ Vitrification Program and are technically and legally defensible. Important issues addressed by the test plan include sampling and analysis strategy, sampling procedures, laboratory analysis, sample control and document management, equipment, data reporting and validation, quality assurance, specific routine procedures to assess data representativeness, safety and training program, and data management. 9 refs., 1 fig., 3 tabs

  4. Testing and demonstrations in ONKALO - aims and needs

    International Nuclear Information System (INIS)

    Anttila, P.; Hellae, P.; Haapala, K.

    2009-04-01

    Posiva Oy is preparing to submit an application for the construction license for a disposal facility at Olkiluoto by the end of 2012. An essential part of the repository development is the construction of the underground research and characterisation facility, ONKALO, which will later be a part of the disposal facility. The construction of ONKALO was commenced in 2004 in order to obtain information on detailed characteristics of the bedrock not possible to provide from the ground surface. ONKALO enables to test and demonstrate the disposal system as designed in a real environment. The objective of this report is to outline the plans for testing and demonstrations for more detailed elaboration of the operational activities and their schedule for the next ten years or more. The main focus is the work to be done in ONKALO, but also other laboratories and facilities above and below ground are considered. The reference design considered here is KBS-3V, but many of the tests and demonstrations proposed are also beneficial for the alternative design, KBS-3H as well. The tests and demonstrations discussed in this report concern activities relating to investigation, construction and operation of the disposal facility. The report shortly describes the current status for the activities and after that preliminary plans for testing and demonstrations are presented for each of them. Finally the location for the performance of the activities and the preliminary time schedule for them are discussed

  5. Ares-I-X Vehicle Preliminary Range Safety Malfunction Turn Analysis

    Science.gov (United States)

    Beaty, James R.; Starr, Brett R.; Gowan, John W., Jr.

    2008-01-01

    Ares-I-X is the designation given to the flight test version of the Ares-I rocket (also known as the Crew Launch Vehicle - CLV) being developed by NASA. As part of the preliminary flight plan approval process for the test vehicle, a range safety malfunction turn analysis was performed to support the launch area risk assessment and vehicle destruct criteria development processes. Several vehicle failure scenarios were identified which could cause the vehicle trajectory to deviate from its normal flight path, and the effects of these failures were evaluated with an Ares-I-X 6 degrees-of-freedom (6-DOF) digital simulation, using the Program to Optimize Simulated Trajectories Version 2 (POST2) simulation framework. The Ares-I-X simulation analysis provides output files containing vehicle state information, which are used by other risk assessment and vehicle debris trajectory simulation tools to determine the risk to personnel and facilities in the vicinity of the launch area at Kennedy Space Center (KSC), and to develop the vehicle destruct criteria used by the flight test range safety officer. The simulation analysis approach used for this study is described, including descriptions of the failure modes which were considered and the underlying assumptions and ground rules of the study, and preliminary results are presented, determined by analysis of the trajectory deviation of the failure cases, compared with the expected vehicle trajectory.

  6. Preliminary considerations on the startup phase for the ASTRID core

    International Nuclear Information System (INIS)

    Mignot, G.

    2015-01-01

    This paper presents preliminary considerations on the startup phase for the ASTRID core, as well as an overview of the different steps before reaching the optimised equilibrium core. The start-up phase is assumed to cover the period between loading the dummy core into the reactor (for commissioning tests) and achieving the optimised equilibrium core. Four main stages are considered: a first stage of start-up tests before fuel core loading, a second stage related to zero power and power ramp-up tests, a third stage corresponding to the transition from the first core to the equilibrium contractual core, and the last stage to reach the optimised performance for the equilibrium core. In the two last stages, a sub-assembly surveillance plan based on post-irradiation examinations is taken into account. As this work is in its preliminary stages, the first scenarios shown for the start-up phase must not be considered as the ASTRID reference scenarios. The scenarios strongly depend on the assumptions considered in the analysis, whereas those discussed in this paper aim at outlining the content and the duration of the starting phases for the ASTRID core, which will be useful in subsequently assessing the core sub-assembly fabrication needs. Assumptions for the start-up phase will be updated in accordance with progress on the ASTRID core design development and core qualification programme. (author)

  7. Test plan for evaluating the performance of the in-tank fluidic sampling system

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The PHMC will provide Low Activity Wastes (LAW) tank wastes for final treatment by a privatization contractor from double-shell feed tanks, 241-AP-102 and 241-AP-104, Concerns about the inability of the baseline ''grab'' sampling to provide large volume samples within time constraints has led to the development of a conceptual sampling system that would be deployed in a feed tank riser, This sampling system will provide large volume, representative samples without the environmental, radiation exposure, and sample volume impacts of the current base-line ''grab'' sampling method. This test plan identifies ''proof-of-principle'' cold tests for the conceptual sampling system using simulant materials. The need for additional testing was identified as a result of completing tests described in the revision test plan document, Revision 1 outlines tests that will evaluate the performance and ability to provide samples that are representative of a tanks' content within a 95 percent confidence interval, to recovery from plugging, to sample supernatant wastes with over 25 wt% solids content, and to evaluate the impact of sampling at different heights within the feed tank. The test plan also identifies operating parameters that will optimize the performance of the sampling system

  8. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    Science.gov (United States)

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  9. IRIS: Proceeding Towards the Preliminary Design

    International Nuclear Information System (INIS)

    Carelli, M.; Miller, K.; Lombardi, C.; Todreas, N.; Greenspan, E.; Ninokata, H.; Lopez, F.; Cinotti, L.; Collado, J.; Oriolo, F.; Alonso, G.; Morales, M.; Boroughs, R.; Barroso, A.; Ingersoll, D.; Cavlina, N.

    2002-01-01

    The IRIS (International Reactor Innovative and Secure) project has completed the conceptual design phase and is moving towards completion of the preliminary design, scheduled for the end of 2002. Several other papers presented in this conference provide details on major aspects of the IRIS design. The three most innovative features which uniquely characterize IRIS are, in descending order of impact: 1. Safety-by-design, which takes maximum advantage of the integral configuration to eliminate from consideration some accidents, greatly lessen the consequence of other accident scenarios and decrease their probability of occurring; 2. Optimized maintenance, where the interval between maintenance shutdowns is extended to 48 months; and 3. Long core life, of at least four years without shuffling or partial refueling. Regarding feature 1, design and analyses will be supplemented by an extensive testing campaign to verify and demonstrate the performance of the integral components, individually as well as interactive systems. Test planning is being initiated. Test results will be factored into PRA analyses under an overall risk informed regulation approach, which is planned to be used in the IRIS licensing. Pre-application activities with NRC are also scheduled to start in mid 2002. Regarding feature 2, effort is being focused on advanced online diagnostics for the integral components, first of all the steam generators, which are the most critical component; several techniques are being investigated. Finally, a four year long life core design is well underway and some of the IRIS team members are examining higher enrichment, eight to ten year life cores which could be considered for reloads. (authors)

  10. SigmaPlot 2000, Version 6.00, SPSS Inc. Computer Software Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    HURLBUT, S.T.

    2000-10-24

    SigmaPlot is a vendor software product used in conjunction with the supercritical fluid extraction Fourier transform infrared spectrometer (SFE-FTIR) system. This product converts the raw spectral data to useful area numbers. SigmaPlot will be used in conjunction with procedure ZA-565-301, ''Determination of Moisture by Supercritical Fluid Extraction and Infrared Detection.'' This test plan will be performed in conjunction with or prior to HNF-6936, ''HA-53 Supercritical Fluid Extraction System Acceptance Test Plan'', to perform analyses for water. The test will ensure that the software can be installed properly and will manipulate the analytical data correctly.

  11. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wallen, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    This document describes the Phase 3 test plan for the Gearbox Reliability Collaborative Gearbox #3. The primary test objective is to measure the planetary load sharing characteristics in the same conditions as the original gearbox design. If the measured load-sharing characteristics are close to the design model, the projected three-times improvement in planetary section predicted fatigue life and the efficacy of preloaded tapered roller bearings in mitigating the planetary bearing fatigue failure mode will have been demonstrated.

  12. Ground-based self-gravity tests for LISA Pathfinder and LISA

    International Nuclear Information System (INIS)

    Trenkel, C; Warren, C; Wealthy, D

    2009-01-01

    Gravitational coupling between the free-falling test masses and the surrounding spacecraft is one of the dominant noise sources for both LISA Pathfinder and LISA. At present, there are no plans to verify any of the self-gravity requirements by test, on the ground. Here, we explore the possibilities of conducting such tests, using a customised torsion balance. We discuss the main sources of systematic and statistical uncertainty present in such a set-up. Our preliminary assessment indicates that the sensitivity is sufficient to carry out meaningful self-gravity tests.

  13. Generalized Test Plan for the Vitrification of Simulated High-Level -Waste Calcine in the Idaho National Laboratory's Bench -Scale Cold Crucible Induction Melter

    International Nuclear Information System (INIS)

    Maio, Vince

    2011-01-01

    This Preliminary Idaho National Laboratory (INL) Test Plan outlines the chronological steps required to initially evaluate the validity of vitrifying INL surrogate (cold) High-Level-Waste (HLW) solid particulate calcine in INL's Cold Crucible Induction Melter (CCIM). Its documentation and publication satisfies interim milestone WP-413-INL-01 of the DOE-EM (via the Office of River Protection) sponsored work package, WP 4.1.3, entitled 'Improved Vitrification' The primary goal of the proposed CCIM testing is to initiate efforts to identify an efficient and effective back-up and risk adverse technology for treating the actual HLW calcine stored at the INL. The calcine's treatment must be completed by 2035 as dictated by a State of Idaho Consent Order. A final report on this surrogate/calcine test in the CCIM will be issued in May 2012-pending next fiscal year funding In particular the plan provides; (1) distinct test objectives, (2) a description of the purpose and scope of planned university contracted pre-screening tests required to optimize the CCIM glass/surrogate calcine formulation, (3) a listing of necessary CCIM equipment modifications and corresponding work control document changes necessary to feed a solid particulate to the CCIM, (4) a description of the class of calcine that will be represented by the surrogate, and (5) a tentative tabulation of the anticipated CCIM testing conditions, testing parameters, sampling requirements and analytical tests. Key FY -11 milestones associated with this CCIM testing effort are also provided. The CCIM test run is scheduled to be conducted in February of 2012 and will involve testing with a surrogate HLW calcine representative of only 13% of the 4,000 m3 of 'hot' calcine residing in 6 INL Bin Sets. The remaining classes of calcine will have to be eventually tested in the CCIM if an operational scale CCIM is to be a feasible option for the actual INL HLW calcine. This remaining calcine's make-up is HLW containing

  14. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 408: Bomblet Target Area, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2006-01-01

    This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 408, Bomblet Target Area. CAU 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. One Corrective Action Site (CAS) is included in CAU 408: (lg b ullet) CAS TA-55-002-TAB2, Bomblet Target Areas Based on historical documentation, personnel interviews, process knowledge, site visits, aerial photography, multispectral data, preliminary geophysical surveys, and the results of data quality objectives process (Section 3.0), clean closure will be implemented for CAU 408. CAU 408 closure activities will consist of identification and clearance of bomblet target areas, identification and removal of depleted uranium (DU) fragments on South Antelope Lake, and collection of verification samples. Any soil containing contaminants at concentrations above the action levels will be excavated and transported to an appropriate disposal facility. Based on existing information, contaminants of potential concern at CAU 408 include explosives. In addition, at South Antelope Lake, bomblets containing DU were tested. None of these contaminants is expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results. The corrective action investigation and closure activities have been planned to include data collection and hold points throughout the process. Hold points are designed to allow decision makers to review the existing data and decide which of the available options are most suitable. Hold points include the review of radiological, geophysical, and analytical data and field observations

  15. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation

  16. The large-scale vented combustion test facility at AECL-WL: description and preliminary test results

    International Nuclear Information System (INIS)

    Loesel Sitar, J.; Koroll, G.W.; Dewit, W.A.; Bowles, E.M.; Harding, J.; Sabanski, C.L.; Kumar, R.K.

    1997-01-01

    Implementation of hydrogen mitigation systems in nuclear reactor containments requires testing the effectiveness of the mitigation system, reliability and availability of the hardware, potential consequences of its use and the technical basis for hardware placement, on a meaningful scale. Similarly, the development and validation of containment codes used in nuclear reactor safety analysis require detailed combustion data from medium- and large-scale facilities. A Large-Scale Combustion Test Facility measuring 10 m x 4 m x 3 m (volume, 120 m 3 ) has been constructed and commissioned at Whiteshell Laboratories to perform a wide variety of combustion experiments. The facility is designed to be versatile so that many geometrical configurations can be achieved. The facility incorporates extensive capabilities for instrumentation and high speed data acquisition, on-line gas sampling and analysis. Other features of the facility include operation at elevated temperatures up to 150 degrees C, easy access to the interior, and remote operation. Initial thermodynamic conditions in the facility can be controlled to within 0.1 vol% of constituent gases. The first series of experiments examined vented combustion in the full 120 m 3 -volume configuration with vent areas in the range of 0.56 to 2.24 m 2 . The experiments were performed at ∼27 degrees C and near-atmospheric pressures, with hydrogen concentrations in the range of 8 to 12% by volume. This paper describes the Large-Scale Vented Combustion Test Facility and preliminary results from the first series of experiments. (author)

  17. Adaptive Management Plan for Sensitive Plant Species on the Nevada Test Site

    International Nuclear Information System (INIS)

    Wills, C. A.

    2001-01-01

    The Nevada Test Site supports numerous plant species considered sensitive because of their past or present status under the Endangered Species Act and with federal and state agencies. In 1998, the U.S. Department of Energy, Nevada Operation Office (DOE/NV) prepared a Resource Management Plan which commits to protects and conserve these sensitive plant species and to minimize accumulative impacts to them. This document presents the procedures of a long-term adaptive management plan which is meant to ensure that these goals are met. It identifies the parameters that are measured for all sensitive plant populations during long-term monitoring and the adaptive management actions which may be taken if significant threats to these populations are detected. This plan does not, however, identify the current list of sensitive plant species know to occur on the Nevada Test Site. The current species list and progress on their monitoring is reported annually by DOE/NV in the Resource Management Plan

  18. Aboveground Injection Sytem Construction and Mecahnical Integrity Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Li, Jun [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    An In-Situ Bioremediation (ISB) Pilot Test Treatability Study is planned at Sandia National Laboratories, New Mexico (SNL/NM) Technical Area-V (TA-V) Groundwater Area of Concern. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater using an injection well. The constituents of concern (COCs) are nitrate and trichloroethene (TCE). The Pilot Test Treatability Study will evaluate the effectiveness of bioremediation and COC treatment over a prescribed period of time. Results of the pilot test will provide data that will be used to evaluate the cost and effectiveness of a fullscale system.

  19. Hanford Tank Farms Waste Certification Flow Loop Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bamberger, Judith A.; Meyer, Perry A.; Scott, Paul A.; Adkins, Harold E.; Wells, Beric E.; Blanchard, Jeremy; Denslow, Kayte M.; Greenwood, Margaret S.; Morgen, Gerald P.; Burns, Carolyn A.; Bontha, Jagannadha R.

    2010-01-01

    A future requirement of Hanford Tank Farm operations will involve transfer of wastes from double shell tanks to the Waste Treatment Plant. As the U.S. Department of Energy contractor for Tank Farm Operations, Washington River Protection Solutions anticipates the need to certify that waste transfers comply with contractual requirements. This test plan describes the approach for evaluating several instruments that have potential to detect the onset of flow stratification and critical suspension velocity. The testing will be conducted in an existing pipe loop in Pacific Northwest National Laboratory’s facility that is being modified to accommodate the testing of instruments over a range of simulated waste properties and flow conditions. The testing phases, test matrix and types of simulants needed and the range of testing conditions required to evaluate the instruments are described

  20. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  1. Test plan for air monitoring during the Cryogenic Retrieval Demonstration

    International Nuclear Information System (INIS)

    Yokuda, E.

    1992-06-01

    This report presents a test plan for air monitoring during the Cryogenic Retrieval Demonstration (CRD). Air monitors will be used to sample for the tracer elements neodymium, terbium, and ytterbium, and dysprosium. The results from this air monitoring will be used to determine if the CRD is successful in controlling dust and minimizing contamination. Procedures and equipment specifications for the test are included

  2. Mixer pump test plan for double shell tank AZ-101

    International Nuclear Information System (INIS)

    STAEHR, T.W.

    1999-01-01

    Mixer pump systems have been chosen as the method for retrieval of tank wastes contained in double shell tanks at Hanford. This document describes the plan for testing and demonstrating the ability of two 300 hp mixer pumps to mobilize waste in tank AZ-101. The mixer pumps, equipment and instrumentation to monitor the test were installed by Project W-151

  3. 118-B-1 excavation treatability test plan

    International Nuclear Information System (INIS)

    1994-07-01

    The Hanford 118-B-1 Burial Ground Treatability Study has been required by milestone change request number-sign M-15-93-04, dated September 30, 1993. The change request requires that a treatability test be conducted at the 100-B Area to obtain additional engineering information for remedial design of burial grounds receiving waste from 100 Area removal actions. This treatability study has two purposes: (1) to support development of the Proposed Plan (PP) and Record of Decision (ROD), which will identify the approach to be used for burial ground remediation, and (2) to provide specific engineering information for receiving waste generated from the 100 Area removal actions. Data generated from this test also will provide critical performance and cost information necessary for remedy evaluation in the detailed analysis of alternatives during preparation of the focused feasibility study (FFS). This treatability testing supports the following 100 Area alternatives: (1) excavation and disposal, and (2) excavation, sorting, (treatment), and disposal

  4. Planning calculations of spray tests for the ERCOSAM-SAMARA project

    Energy Technology Data Exchange (ETDEWEB)

    Liang, Z. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Andreani, M. [Paul Scherrer Institut, Laboratory for Thermal-Hydraulics, Villigen (Switzerland)

    2012-07-01

    Within the framework of the ERCOSAM-SAMARA project, co-funded by the European Union and the Russian State Atomic Energy Corporation, planning and pre-test calculations are performed to examine sensitivity parameters that can affect the break-up (erosion) of a helium (substitute for hydrogen) layer by mitigation devices (i.e., cooler, spray, or Passive Autocatalytic Recombiner - PAR). This paper reports the GOTHIC analysis results for the spray tests to be performed in the PANDA facility. The effects of spray flow rate, temperature and injection height on depressurization, erosion of helium cloud and gas transport behavior are studied. This analysis is valuable because only a limited number of conditions will be examined in the planned experiments. The study provides a useful understanding of the interaction of spray with a stratified atmosphere. (author)

  5. Test plan for demonstration of Rapid Transuranic Monitoring Laboratory

    International Nuclear Information System (INIS)

    McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

    1993-06-01

    This plan describes tests to demonstrate the capability of the Rapid Transuranic Monitoring Laboratory (RTML) to monitor airborne alpha-emitting radionuclides and analyze soil, smear, and filter samples for alpha- and gamma-emitting radionuclides under field conditions. The RTML will be tested during June 1993 at a site adjacent to the Cold Test Pit at the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. Measurement systems installed in the RTML that will be demonstrated include two large-area ionization chamber alpha spectrometers, an x-ray/gamma-ray spectrometer, and four alpha continuous air monitors. Test objectives, requirements for data quality, experimental apparatus and procedures, and safety and logistics issues are described

  6. Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations

  7. KEK plans for a linear collider R ampersand D

    International Nuclear Information System (INIS)

    Horikoshi, G.; Kimura, Y.; Nishikawa, T.

    1989-01-01

    An overall R ampersand D activities of Japanese Linear Collider (JLC) is surveyed. The JLC is a conceptual plan of post TRISTAN projects in KEK. This is a large linear collider consisting of a pair of linear accelerators of 0.5 TeV each (for electron and positron), and a pair of damping rings. As a preliminary work, an R ampersand D group is promoting the Test Accelerator Facility (TAF) as a pilot plan. The TAF consists of a linear accelerator with an energy of 1.5 GeV and a damping ring, and will be used for the beam acceleration test with a high gradient of 100 MV/m. An R ampersand D on the high Tc superconducting thin film is also underway to investigate possible application to the RF accelerating structure for the superconducting linear collider. 11 refs., 7 figs., 1 tab

  8. Preliminary irradiation test results from the Yankee Atomic Electric Company reactor vessel test irradiation program

    International Nuclear Information System (INIS)

    Biemiller, E.C.; Fyfitch, S.; Campbell, C.A.

    1993-01-01

    The Yankee Atomic Electric Company test irradiation program was implemented to characterize the irradiation response of representative Yankee Rowe reactor vessel beltline plate materials and to remove uncertainties in the analysis of existing irradiation data on the Yankee Rowe reactor vessel steel. Plate materials each containing 0.24 w/o copper, but different nickel contents at 0.63 w/o and 0.19 w/o, were heat treated to simulate the Yankee vessel heat treatment (austenitized at 1800 deg F) and to simulate Regulatory Guide 1.99 database materials (austenitized at 1600 deg. F). These heat treatments produced different microstructures so the effect of microstructure on irradiation damage sensitivity could be tested. Because the nickel content of the test plates varied and the copper level was constant, the effect of nickel on irradiation embrittlement was also tested. Correlation monitor material, HSST-02, was included in the program to benchmark the Ford Nuclear Reactor (U. of Michigan Test Reactor) which had never been used for this type of irradiation program. Materials taken from plate surface locations (vs. 1/4T) were included to test whether or not the improved toughness properties of the plate surface layer, resulting from the rapid quench, is maintained after irradiation. If the improved properties are maintained, pressurized thermal shock calculations could utilize this margin. Finally, for one experiment, irradiations were conducted at two irradiation temperatures (500 deg. F and 550 deg. F) to determine the effect of irradiation temperature on embrittlement. The preliminary results of the irradiation program show an increase in T 30 shift of 69 deg. F for a decrease in irradiation temperature of 50 deg. F. The results suggest that for nickel bearing steels, the superior toughness of plate surface material is maintained after irradiation and for the copper content tested, nickel had no apparent effect on irradiation response. No apparent microstructure

  9. Test plan for K Basin Sludge Canister and Floor Sampling Device

    International Nuclear Information System (INIS)

    Meling, T.A.

    1995-01-01

    This document provides the test plan and procedure forms for conducting the functional and operational acceptance testing of the K Basin Sludge Canister and Floor Sampling Device(s). These samplers samples sludge off the floor of the 100K Basins and out of 100K fuel storage canisters

  10. Growth plan for an inspirational test-bed of smart textile services

    NARCIS (Netherlands)

    Wensveen, S.A.G.; Tomico, O.; Bhomer, ten M.; Kuusk, K.

    2015-01-01

    In this pictorial we visualize the growth plan for an inspirational test-bed of smart textile product service systems. The goal of the test-bed is to inspire and inform the Dutch creative industries of textile, interaction and service design to combine their strengths and share opportunities. The

  11. In situ vitrification: Preliminary results from the first large-scale radioactive test

    International Nuclear Information System (INIS)

    Buelt, J.L.; Westsik, J.H.

    1988-02-01

    The first large-scale radioactive test (LSRT) of In Situ Vitrification (ISV) has been completed. In Situ Vitrification is a process whereby joule heating immobilizes contaminated soil in place by converting it to a durable glass and crystalline waste form. The LSRT was conducted at an actual transuranic contaminated soil site on the Department of Energy's Hanford Site. The test had two objectives: (1) determine large-scale processing performance and (2) produce a waste form that can be fully evaluated as a potential technique for the final disposal of transuranic-contaminated soil sites at Hanford. This accomplishment has provided technical data to evaluate the ISV process for its potential in the final disposition of transuranic-contaminated soil sites at Hanford. Because of the test's successful completion, within a year technical data on the vitrified soil will be available to determine how well the process incorporates transuranics into the waste form and how well the form resists leaching of transuranics. Preliminary results available include retention of transuranics and other elements within the waste form during processing and the efficiency of the off-gas treatment system in removing contaminants from the gaseous effluents. 13 refs., 10 figs., 5 tabs

  12. Detailed technical plan for Test Program Element-III (TPE-III) of the first wall/blanket shield engineering test program

    Energy Technology Data Exchange (ETDEWEB)

    Turner, L.R.; Praeg, W.F.

    1982-03-01

    The experimental requirements, test-bed design, and computational requirements are reviewed and updated. Next, in Sections 3, 4 and 5, the experimental plan, instrumentation, and computer plan, respectively, are described. Finally, Section 6 treats other considerations, such as personnel, outside participation, and distribution of results.

  13. Detailed technical plan for Test Program Element-III (TPE-III) of the first wall/blanket shield engineering test program

    International Nuclear Information System (INIS)

    Turner, L.R.; Praeg, W.F.

    1982-03-01

    The experimental requirements, test-bed design, and computational requirements are reviewed and updated. Next, in Sections 3, 4 and 5, the experimental plan, instrumentation, and computer plan, respectively, are described. Finally, Section 6 treats other considerations, such as personnel, outside participation, and distribution of results

  14. Modeling and Testing of EVs - Preliminary Study and Laboratory Development

    DEFF Research Database (Denmark)

    Yang, Guang-Ya; Marra, Francesco; Nielsen, Arne Hejde

    2010-01-01

    Electric vehicles (EVs) are expected to play a key role in the future energy management system to stabilize both supply and consumption with the presence of high penetration of renewable generation. A reasonably accurate model of battery is a key element for the study of EVs behavior and the grid...... tests, followed by the suggestions towards a feasible battery model for further studies.......Electric vehicles (EVs) are expected to play a key role in the future energy management system to stabilize both supply and consumption with the presence of high penetration of renewable generation. A reasonably accurate model of battery is a key element for the study of EVs behavior and the grid...... impact at different geographical areas, as well as driving and charging patterns. Electric circuit model is deployed in this work to represent the electrical properties of a lithium-ion battery. This paper reports the preliminary modeling and validation work based on manufacturer data sheet and realistic...

  15. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  16. To test or not to test

    DEFF Research Database (Denmark)

    Rochon, Justine; Gondan, Matthias; Kieser, Meinhard

    2012-01-01

    Background: Student's two-sample t test is generally used for comparing the means of two independent samples, for example, two treatment arms. Under the null hypothesis, the t test assumes that the two samples arise from the same normally distributed population with unknown variance. Adequate...... control of the Type I error requires that the normality assumption holds, which is often examined by means of a preliminary Shapiro-Wilk test. The following two-stage procedure is widely accepted: If the preliminary test for normality is not significant, the t test is used; if the preliminary test rejects...... the null hypothesis of normality, a nonparametric test is applied in the main analysis. Methods: Equally sized samples were drawn from exponential, uniform, and normal distributions. The two-sample t test was conducted if either both samples (Strategy I) or the collapsed set of residuals from both samples...

  17. Equity in transportation: new approach in transport planningpreliminary results of case study in Cracow

    Directory of Open Access Journals (Sweden)

    Lidia ZAKOWSKA

    2014-09-01

    Full Text Available The goal of the paper is to present the concept of equity as a new approach in transport and land-use planning. This concept is consistent with the objectives of sustainable development and it is becoming more common in European and world literature. Understanding the idea of equity in the context of the transport system development is very important in creating sustainable cities and regions without discriminating any social groups and creating a cohesive society not exposed to social exclusion due to lack of access to primary and secondary activities. The paper presents some results of the preliminary analysis on transport equity in Cracow. The basic equity level which has been considered here concerns senior citizens, older people living in Cracow area, in terms of their accessibility to transport infrastructure. Taking into account living conditions of elderly pedestrians, contour measures were used, in order to determine accessibility as equity indicator.

  18. Minnesota urban partnership agreement national evaluation : content analysis test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the content analysis test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing ...

  19. Minnesota urban partnership agreement national evaluation : safety data test plan.

    Science.gov (United States)

    2009-11-17

    This report provides the safety data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing strat...

  20. Minnesota urban partnership agreement national evaluation : exogenous factors test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the exogenous factors test plan for the national evaluation of the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reduc...

  1. TMI-2 containment decontamination plans

    International Nuclear Information System (INIS)

    McDougall, F.

    1980-01-01

    Because of other priorities such as reentry, purging, and recovery, containment decontamination is only in the preliminary planning stages. This paper summarizes the study with emphasis on the remote decontamination techniques

  2. Reliability criteria selection for integrated resource planning

    International Nuclear Information System (INIS)

    Ruiu, D.; Ye, C.; Billinton, R.; Lakhanpal, D.

    1993-01-01

    A study was conducted on the selection of a generating system reliability criterion that ensures a reasonable continuity of supply while minimizing the total costs to utility customers. The study was conducted using the Institute for Electronic and Electrical Engineers (IEEE) reliability test system as the study system. The study inputs and results for conditions and load forecast data, new supply resources data, demand-side management resource data, resource planning criterion, criterion value selection, supply side development, integrated resource development, and best criterion values, are tabulated and discussed. Preliminary conclusions are drawn as follows. In the case of integrated resource planning, the selection of the best value for a given type of reliability criterion can be done using methods similar to those used for supply side planning. The reliability criteria values previously used for supply side planning may not be economically justified when integrated resource planning is used. Utilities may have to revise and adopt new, and perhaps lower supply reliability criteria for integrated resource planning. More complex reliability criteria, such as energy related indices, which take into account the magnitude, frequency and duration of the expected interruptions are better adapted than the simpler capacity-based reliability criteria such as loss of load expectation. 7 refs., 5 figs., 10 tabs

  3. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results; Impact des changements climatiques sur les plans de gestion des reservoirs Saint-Francois et Aylmer : resultats preliminaires

    Energy Technology Data Exchange (ETDEWEB)

    Turcotte, R; Fortin, L G; Pugin, S; Cyr, J F; Picard, F; Poirier, C; Lacombe, P [Centre d' Expertise Hydrique du Quebec, Quebec, PQ (Canada). Service de la Securite des Barrages; Chaumont, D; Desrochers, G; Vescovi, L; Roy, R [Ouranos, Montreal, PQ (Canada)

    2004-09-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs.

  4. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results; Impact des changements climatiques sur les plans de gestion des reservoirs Saint-Francois et Aylmer : resultats preliminaires

    Energy Technology Data Exchange (ETDEWEB)

    Turcotte, R.; Fortin, L.G.; Pugin, S.; Cyr, J.F.; Picard, F.; Poirier, C.; Lacombe, P. [Centre d' Expertise Hydrique du Quebec, Quebec, PQ (Canada). Service de la Securite des Barrages; Chaumont, D.; Desrochers, G.; Vescovi, L.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2004-09-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs.

  5. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  6. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    International Nuclear Information System (INIS)

    Haagenstad, T.

    1999-01-01

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility

  7. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  8. Expectations of a business rescue plan: international directives for ...

    African Journals Online (AJOL)

    Expectations of a business rescue plan: international directives for Chapter 6 implementation. ... AFRICAN JOURNALS ONLINE (AJOL) · Journals · Advanced Search ... Preliminary analysis of business rescue plans suggested that a significant ...

  9. A test sheet generating algorithm based on intelligent genetic algorithm and hierarchical planning

    Science.gov (United States)

    Gu, Peipei; Niu, Zhendong; Chen, Xuting; Chen, Wei

    2013-03-01

    In recent years, computer-based testing has become an effective method to evaluate students' overall learning progress so that appropriate guiding strategies can be recommended. Research has been done to develop intelligent test assembling systems which can automatically generate test sheets based on given parameters of test items. A good multisubject test sheet depends on not only the quality of the test items but also the construction of the sheet. Effective and efficient construction of test sheets according to multiple subjects and criteria is a challenging problem. In this paper, a multi-subject test sheet generation problem is formulated and a test sheet generating approach based on intelligent genetic algorithm and hierarchical planning (GAHP) is proposed to tackle this problem. The proposed approach utilizes hierarchical planning to simplify the multi-subject testing problem and adopts genetic algorithm to process the layered criteria, enabling the construction of good test sheets according to multiple test item requirements. Experiments are conducted and the results show that the proposed approach is capable of effectively generating multi-subject test sheets that meet specified requirements and achieve good performance.

  10. Test plan for Enraf Series 854 level gauge testing in Tank 241-S-106

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1994-01-01

    An Enraf Series 854 level gauge was installed on Tank 241-S-106 (S-106) during the first week of June 1994. On August 11, 1994, the gauge's measuring wire broke. An investigation has been started to determine how the wire broke. This test plan identifies a qualification test that is part of this investigation. This test will also provide evidence as to the location and extent of potential corrosion on the measuring wire due to tank environment. The results from this testing will provide data for better material selections. This test will involve placing the existing Enraf Series 854 level gauge back into service with the same type of measuring wire (316 stainless steel) that originally broke on August 11, 1994. The gauge will be operated for 14 days. At the end of the 14-day test, the wire shall be sent to Pacific Northwest Laboratory (PNL) for analysis

  11. Grid-connected ICES: preliminary feasibility analysis and evaluation. Volume 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1977-06-30

    The HEAL Complex in New Orleans will serve as a Demonstration Community for which the ICES Demonstration System will be designed. The complex is a group of hospitals, clinics, research facilities, and medical educational facilities. The five tasks reported on are: preliminary energy analysis; preliminary institutional assessment; conceptual design; firming-up of commitments; and detailed work management plan.

  12. Field testing at the Climax Stock on the Nevada Test Site: spent fuel test and radionuclide migration experiments

    International Nuclear Information System (INIS)

    Ballou, L.B.; Isherwood, D.J.; Patrick, W.C.

    1982-01-01

    Two field tests in the Climax Stock are being conducted. The Climax Stock, a granitic instrusive, has been administratively excluded from consideration as a full-scale repository site. However, it provides a readily available facility for field testing with high-level radioactive materials at a depth (420 m) approaching that of a repository. The major test activity in the 1980 fiscal year has been initiation of the Spent Fuel Test-Climax (SFT-C). This test, which was authorized in June 1978, is designed to evaluate the generic feasibility of geologic storage and retrievability of commercial power reactor spent fuel assemblies in a granitic medium. In addition, the test is configured and instrumented to provide thermal and thermomechanical response data that will be relevant to the design of a repository in hard crystalline rock. The other field activity in the Climax Stock is a radionuclide migration test. It combines a series of field and laboratory migration experiments with the use of existing hydrologic models for pretest predictions and data interpretation. Goals of this project are to develop: (1) field measurement techniques for radionuclide migration studies in a hydrologic regime where the controlling mechanism is fracture permeability; (2) field test data on radionuclide migration; and (3) a comparison of laboratory- and field-measured retardation factors. This radionuclide migration test, which was authorized in the middle of the 1980 fiscal year, is in the preliminary design phase. The detailed program plan was prepared and subjected to formal peer review in August. In September/October researchers conducted preliminary flow tests with water in selected near-vertical fractures intersected by small horizontal boreholes. These tests were needed to establish the range of pressures, flow rates, and other operating parameters to be used in conducting the nuclide migration tests. 21 references, 14 figures, 1 table

  13. Radon concentrations in Norwegian kindergartens: survey planning and preliminary results

    International Nuclear Information System (INIS)

    Birovljev, A.; Strand, T.; Heiberg, A.

    1998-01-01

    An extensive radon survey in Norwegian kindergartens and schools was started in early 1997; so far 2481 kindergartens were examined. Preliminary results of the first phase of the survey are presented in tabular and graphic form including, among others, the dependence of average radon concentration on the construction year of the kindergartens and on the age of the buildings. (A.K.)

  14. Optimal Constant-Stress Accelerated Degradation Test Plans Using Nonlinear Generalized Wiener Process

    Directory of Open Access Journals (Sweden)

    Zhen Chen

    2016-01-01

    Full Text Available Accelerated degradation test (ADT has been widely used to assess highly reliable products’ lifetime. To conduct an ADT, an appropriate degradation model and test plan should be determined in advance. Although many historical studies have proposed quite a few models, there is still room for improvement. Hence we propose a Nonlinear Generalized Wiener Process (NGWP model with consideration of the effects of stress level, product-to-product variability, and measurement errors for a higher estimation accuracy and a wider range of use. Then under the constraints of sample size, test duration, and test cost, the plans of constant-stress ADT (CSADT with multiple stress levels based on the NGWP are designed by minimizing the asymptotic variance of the reliability estimation of the products under normal operation conditions. An optimization algorithm is developed to determine the optimal stress levels, the number of units allocated to each level, inspection frequency, and measurement times simultaneously. In addition, a comparison based on degradation data of LEDs is made to show better goodness-of-fit of the NGWP than that of other models. Finally, optimal two-level and three-level CSADT plans under various constraints and a detailed sensitivity analysis are demonstrated through examples in this paper.

  15. Hanford Permanent Isolation Barrier Program: Asphalt technology test plan

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, H.D.; Romine, R.A.

    1994-05-01

    The Hanford Permanent Isolation Barriers use engineered layers of natural materials to create an integrated structure with backup protective features. The objective of current designs is to develop a maintenance-free permanent barrier that isolates wastes for a minimum of 1000 years by limiting water drainage to near-zero amounts. Asphalt is being used as an impermeable water diversion layer to provide a redundant layer within the overall barrier design. Data on asphalt barrier properties in a buried environment are not available for the required 100-year time frame. The purpose of this test plan is to outline the activities planned to obtain data with which to estimate performance of the asphalt layers.

  16. Hanford Permanent Isolation Barrier Program: Asphalt technology test plan

    International Nuclear Information System (INIS)

    Freeman, H.D.; Romine, R.A.

    1994-05-01

    The Hanford Permanent Isolation Barriers use engineered layers of natural materials to create an integrated structure with backup protective features. The objective of current designs is to develop a maintenance-free permanent barrier that isolates wastes for a minimum of 1000 years by limiting water drainage to near-zero amounts. Asphalt is being used as an impermeable water diversion layer to provide a redundant layer within the overall barrier design. Data on asphalt barrier properties in a buried environment are not available for the required 100-year time frame. The purpose of this test plan is to outline the activities planned to obtain data with which to estimate performance of the asphalt layers

  17. A preliminary conceptual design study for Korean fusion DEMO reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Keeman, E-mail: kkeeman@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahak-ro, Daejeon 305-806 (Korea, Republic of); Kim, Hyoung Chan; Oh, Sangjun; Lee, Young Seok; Yeom, Jun Ho; Im, Kihak; Lee, Gyung-Su [National Fusion Research Institute, 169-148 Gwahak-ro, Daejeon 305-806 (Korea, Republic of); Neilson, George; Kessel, Charles; Brown, Thomas; Titus, Peter [Princeton Plasma Physics Laboratory, Princeton University, Princeton, NJ 08543 (United States)

    2013-10-15

    Highlights: ► Perform a preliminary conceptual study for a steady-state Korean DEMO reactor. ► Present design guidelines and requirements of Korean DEMO reactor. ► Present a preliminary design of TF (toroidal field) and CS (central solenoid) magnet. ► Present a preliminary result of the radial build scheme of Korean DEMO reactor. -- Abstract: As the ITER is being constructed, there is a growing anticipation for an earlier realization of fusion energy, so called fast-track approach. Korean strategy for fusion energy can be regarded as a fast-track approach and one special concept discussed in this paper is a two-stage development plan. At first, a steady-state Korean DEMO Reactor (K-DEMO) is designed not only to demonstrate a net electricity generation and a self-sustained tritium cycle, but also to be used as a component test facility. Then, at its second stage, a major upgrade is carried out by replacing in-vessel components in order to show a net electric generation on the order of 300 MWe and the competitiveness in cost of electricity (COE). The major radius is designed to be just below 6.5 m, considering practical engineering feasibilities. By using high performance Nb{sub 3}Sn-based superconducting cable currently available, high magnetic field at the plasma center above 8 T can be achieved. A design concept for TF magnets and radial builds for the K-DEMO considering a vertical maintenance scheme, are presented together with preliminary design parameters.

  18. Pre-flight physical simulation test of HIMES reentry test vehicle

    Science.gov (United States)

    Kawaguchi, Jun'ichiro; Inatani, Yoshifumi; Yonemoto, Koichi; Hosokawa, Shigeru

    ISAS is now developing a small reentry test vehicle, which is 2m long with a 1.5m wing span and weighs about 170 kg, for the purpose of exploring high angle-of-attack aerodynamic attitude control issue in supersonic and hypersonic speed. The flight test, employing 'Rockoon' launch system, is planned as a preliminary design verification for a fully reusable winged rocket named HIMES (Highly Maneuverable Experimental Space) vehicle. This paper describes the results of preflight ground test using a motion table system. This ground system test is called 'physical simulation' aimed at: (1) functional verification of side-jet system, aerodynamic surface actuators, battery and onboard avionics; and (2) guidance and control law evaluation, in total hardware-in-the-loop system. The pressure of side-jet nozzles was measured to provide exact thrust characteristics of reaction control. The dynamics of vehicle motion was calculated in real-time by the ground simulation computer.

  19. A nuclear power plant certification test plan and checklist

    International Nuclear Information System (INIS)

    Halverson, S.M.

    1989-01-01

    Regulations within the nuclear industry are requiring that all reference plant simulators be certified prior to or during 1991. A certification test plan is essential to ensure that this goal is met. A description of each step in the certification process is provided in this paper, along with a checklist to help ensure completion of each item

  20. Preliminary test results from a telescope of Hughes pixel arrays at FNAL

    International Nuclear Information System (INIS)

    Jernigan, J.G.; Arens, J.; Vezie, D.; Collins, T.; Krider, J.; Skubic, P.

    1992-09-01

    In December of 1991 three silicon hybrid pixel detectors each having 2.56 x 2.56 pixels 30 μm square, made by the Hughes Aircraft Company, were placed in a high energy muon beam at the Fermi National Accelerator Laboratory. Straight tracks were recorded in these detectors at angles to the normal to the plane of the silicon ranging from 0 to 45 degrees. In this note, preliminary results are presented on the straight through tracks, i.e., those passing through the telescope at normal incidence. Pulse height data, signal-to-noise data, and preliminary straight line fits to the data resulting in residual distributions are presented. Preliminary calculations show spatial resolution of less than 5 μm in two dimensions

  1. Preliminary test results from a free-piston Stirling engine technology demonstration program to support advanced radioisotope space power applications

    International Nuclear Information System (INIS)

    White, Maurice A.; Qiu Songgang; Augenblick, Jack E.

    2000-01-01

    Free-piston Stirling engines offer a relatively mature, proven, long-life technology that is well-suited for advanced, high-efficiency radioisotope space power systems. Contracts from DOE and NASA are being conducted by Stirling Technology Company (STC) for the purpose of demonstrating the Stirling technology in a configuration and power level that is representative of an eventual space power system. The long-term objective is to develop a power system with an efficiency exceeding 20% that can function with a high degree of reliability for up to 15 years on deep space missions. The current technology demonstration convertors (TDC's) are completing shakedown testing and have recently demonstrated performance levels that are virtually identical to projections made during the preliminary design phase. This paper describes preliminary test results for power output, efficiency, and vibration levels. These early results demonstrate the ability of the free-piston Stirling technology to exceed objectives by approximately quadrupling the efficiency of conventional radioisotope thermoelectric generators (RTG's)

  2. Preliminary test results from a free-piston Stirling engine technology demonstration program to support advanced radioisotope space power applications

    Science.gov (United States)

    White, Maurice A.; Qiu, Songgang; Augenblick, Jack E.

    2000-01-01

    Free-piston Stirling engines offer a relatively mature, proven, long-life technology that is well-suited for advanced, high-efficiency radioisotope space power systems. Contracts from DOE and NASA are being conducted by Stirling Technology Company (STC) for the purpose of demonstrating the Stirling technology in a configuration and power level that is representative of an eventual space power system. The long-term objective is to develop a power system with an efficiency exceeding 20% that can function with a high degree of reliability for up to 15 years on deep space missions. The current technology demonstration convertors (TDC's) are completing shakedown testing and have recently demonstrated performance levels that are virtually identical to projections made during the preliminary design phase. This paper describes preliminary test results for power output, efficiency, and vibration levels. These early results demonstrate the ability of the free-piston Stirling technology to exceed objectives by approximately quadrupling the efficiency of conventional radioisotope thermoelectric generators (RTG's). .

  3. Prototype Engineered Barrier System Field Tests (PEBSFT)

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Wilder, D.G.

    1991-02-01

    This progress report presents the interpretation of data obtained (up to November 1, 1988) from the Prototype Engineered Barrier System Field Tests (PEBSFT) that are being performed for the Yucca Mountain Project (YMP) in G-Tunnel within the Nevada Test site. The PEBSFTs are being conducted to evaluate the applicability of measurement techniques, numerical models, and procedures developed for the field tests for future investigations that will be conducted in the Exploratory Shaft Facilities, at a potential high-level radioactive waste repository site in Yucca Mountain. The primary objective of the tests is to provide the basis for determining whether tests planned for Yucca Mountain have the potential to be successful. Thirteen chapters discuss the following: mapping the electromagnetic permittivity and attenuation rate of the rock mass; changes in moisture content detected by the neutron logging probe; characterization of the in-situ permeability of the fractured tuff around the heater borehole; electrical resistance heater installed in a 30-cm borehole; relative humidity measurements; the operation, design, construction, calibration, and installation of a microwave circuit that might provide partial pressure information at temperatures in excess of 200 degree C (392 degree F); pressure and temperature measurements in the G-Tunnel; the moisture collection system, which attempts to collect steam that migrates into the heater borehole; The borehole television and borescope surveys that were performed to map the location, orientation, and aperture of the fractures intersecting the boreholes; preliminary scoping calculations of the hydrothermal conditions expected for this prototype test; the Data Acquisition System; and the results of the PEBSFT, preliminary interpretations of these results, and plans for the remainder of the test. Chapters have been indexed separately for inclusion on the data base

  4. Safety of high speed ground transportation systems: X2000 US demonstration vehicle dynamics trials, preliminary test report. Report for October 1992-January 1993

    Energy Technology Data Exchange (ETDEWEB)

    Whitten, B.T.; Kesler, J.K.

    1993-01-01

    The report documents the procedures, events, and results of vehicle dynamic tests carried out on the ASEA-Brown Boveri (ABB) X2000 tilt body trainset in the US between October 1992 and January 1993. These tests, sponsored by Amtrak and supported by the FRA, were conducted to assess the suitability of the X2000 trainset for safe operation at elevated cant deficiencies and speeds in Amtrak's Northeast Corridor under existing track conditions in a revenue service demonstration. The report describes the safety criteria against which the performance of the X2000 test train was examined, the instrumentation used, the test locations, and the track conditions. Preliminary results are presented from tests conducted on Amtrak lines between Philadelphia and Harrisburg, PA, and between Washington DC and New York NY, in which cant deficiencies of 12.5 inches and speeds of 154 mph were reached in a safe and controlled manner. The significance of the results is discussed, and preliminary conclusions and recommendations are presented.

  5. Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet

    International Nuclear Information System (INIS)

    NORMAN, E.C.

    2000-01-01

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation

  6. Abbreviated sampling and analysis plan for planning decontamination and decommissioning at Test Reactor Area (TRA) facilities

    International Nuclear Information System (INIS)

    1994-10-01

    The objective is to sample and analyze for the presence of gamma emitting isotopes and hazardous constituents within certain areas of the Test Reactor Area (TRA), prior to D and D activities. The TRA is composed of three major reactor facilities and three smaller reactors built in support of programs studying the performance of reactor materials and components under high neutron flux conditions. The Materials Testing Reactor (MTR) and Engineering Test Reactor (ETR) facilities are currently pending D/D. Work consists of pre-D and D sampling of designated TRA (primarily ETR) process areas. This report addresses only a limited subset of the samples which will eventually be required to characterize MTR and ETR and plan their D and D. Sampling which is addressed in this document is intended to support planned D and D work which is funded at the present time. Biased samples, based on process knowledge and plant configuration, are to be performed. The multiple process areas which may be potentially sampled will be initially characterized by obtaining data for upstream source areas which, based on facility configuration, would affect downstream and as yet unsampled, process areas. Sampling and analysis will be conducted to determine the level of gamma emitting isotopes and hazardous constituents present in designated areas within buildings TRA-612, 642, 643, 644, 645, 647, 648, 663; and in the soils surrounding Facility TRA-611. These data will be used to plan the D and D and help determine disposition of material by D and D personnel. Both MTR and ETR facilities will eventually be decommissioned by total dismantlement so that the area can be restored to its original condition

  7. Detailed leak detection test plan and schedule for Oak Ridge National Laboratory liquid low-level waste active tanks

    International Nuclear Information System (INIS)

    1995-01-01

    This document provides a plan and schedule for leak testing a portion of the Liquid Low-Level Waste (LLLW) system at the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. It is a concise version of a more general leak testing plan that was prepared in response to the requirements of the Federal Facility Agreement (FFA) for the Oak Ridge Reservation (ORR). This plan includes a schedule for the initial reporting of the leak test results from the various tanks that will be tested. The FFA distinguishes four categories of tank and pipeline systems: new systems (Category A), doubly contained systems (Category B), singly contained systems (Category C), and inactive systems (Category D). The FFA specifically requires leak testing of the Category C systems; there are 14 such tanks addressed in this plan, plus one tank (W-12) that has been temporarily returned to service based on EPA and TDEC concurrence. A schedule for testing these tanks is also included. The plan and schedule also addresses an additional 15 Category B tanks have been demonstrated to meet secondary containment requirements. While these 15 tanks are addressed in this plan for the sake of completeness, they have been removed from the leak testing program based on the design demonstrations that show secondary containment. It is noted that the general plan included 42 tanks. Since that report was issued, 26 of those tanks have passed secondary containment design demonstrations and subsequently have been removed from this leak testing plan. In addition, one tank (LA-104) has been removed from service. Accordingly, this document addresses 15 of the LLLW tanks in the system; plans for testing the pipelines will be described in a separate document

  8. Detailed leak detection test plan and schedule for Oak Ridge National Laboratory liquid low-level waste active tanks

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    This document provides a plan and schedule for leak testing a portion of the Liquid Low-Level Waste (LLLW) system at the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. It is a concise version of a more general leak testing plan that was prepared in response to the requirements of the Federal Facility Agreement (FFA) for the Oak Ridge Reservation (ORR). This plan includes a schedule for the initial reporting of the leak test results from the various tanks that will be tested. The FFA distinguishes four categories of tank and pipeline systems: new systems (Category A), doubly contained systems (Category B), singly contained systems (Category C), and inactive systems (Category D). The FFA specifically requires leak testing of the Category C systems; there are 14 such tanks addressed in this plan, plus one tank (W-12) that has been temporarily returned to service based on EPA and TDEC concurrence. A schedule for testing these tanks is also included. The plan and schedule also addresses an additional 15 Category B tanks have been demonstrated to meet secondary containment requirements. While these 15 tanks are addressed in this plan for the sake of completeness, they have been removed from the leak testing program based on the design demonstrations that show secondary containment. It is noted that the general plan included 42 tanks. Since that report was issued, 26 of those tanks have passed secondary containment design demonstrations and subsequently have been removed from this leak testing plan. In addition, one tank (LA-104) has been removed from service. Accordingly, this document addresses 15 of the LLLW tanks in the system; plans for testing the pipelines will be described in a separate document.

  9. Operations plan for the Regional Seismic Test Network

    International Nuclear Information System (INIS)

    1981-01-01

    The Regional Seismic Test Network program was established to provide a capability for detection of extremely sensitive earth movements. Seismic signals from both natural and man-made earth motions will be analyzed with the ultimate objective of accurately locating underground nuclear explosions. The Sandia National Laboratories, Albuquerque, has designed an unattended seismic station capable of recording seismic information received at the location of the seismometers installed as part of that specific station. A network of stations is required to increase the capability of determining the source of the seismic signal and the location of the source. Current plans are to establish a five-station seismic network in the United States and Canada. The Department of Energy, Nevada Operations Office, has been assigned the responsibility for deploying, installing, and operating these remote stations. This Operation Plan provides the basic information and tasking to accomplish this assignment

  10. PREPARE: guidelines for planning animal research and testing.

    Science.gov (United States)

    Smith, Adrian J; Clutton, R Eddie; Lilley, Elliot; Hansen, Kristine E Aa; Brattelid, Trond

    2018-04-01

    There is widespread concern about the quality, reproducibility and translatability of studies involving research animals. Although there are a number of reporting guidelines available, there is very little overarching guidance on how to plan animal experiments, despite the fact that this is the logical place to start ensuring quality. In this paper we present the PREPARE guidelines: Planning Research and Experimental Procedures on Animals: Recommendations for Excellence. PREPARE covers the three broad areas which determine the quality of the preparation for animal studies: formulation, dialogue between scientists and the animal facility, and quality control of the various components in the study. Some topics overlap and the PREPARE checklist should be adapted to suit specific needs, for example in field research. Advice on use of the checklist is available on the Norecopa website, with links to guidelines for animal research and testing, at https://norecopa.no/PREPARE .

  11. Preliminary prediction of inflow into the D-holes at the Stripa Mine

    International Nuclear Information System (INIS)

    Long, J.C.S.; Karasaki, K.; Davey, A.; Peterson, J.; Landsfeld, M.; Kemeny, J.; Martel, S.

    1990-02-01

    Lawrence Berkeley Laboratory (LBL) is contracted by the US Department of Energy to provide an auxiliary modeling effort for the Stripa Project. Within this effort, we are making calculations of inflow to the Simulated Drift Experiment (SDE), i.e. inflow to six parallel, closely spaced D-holes, using a preliminary set of data collected in five other holes, the N- and W-holes during Stages 1 and 2 of the Site Characterization and Validation (SCV) project. Our approach has been to focus on the fracture zones rather than the general set of ubiquitous fractures. Approximately 90% of all the water flowing in the rock is flowing in fracture zones which are neither uniformly conductive nor are they infinitely extensive. Our approach has been to adopt the fracture zone locations as they have been identified with geophysics. We use geologic sense and the original geophysical data to add one zone where significant water inflow has been observed that can not be explained with the other geophysical zones. This report covers LBL's preliminary prediction of flow into the D-holes. Care should be taken in interpreting the results given in this report. As explained below, the approach that LBL has designed for developing a fracture hydrology model requires cross-hole hydrologic data. Cross-hole tests are planned for Stage 3 but were unavailable in Stage 1. As such, we have inferred from available data what a cross-hole test might show and used this synthetic data to make a preliminary calculation of the inflow into the D-holes. Then using all the Stage 3 data we will calculate flow into the Validation Drift itself. The report mainly demonstrates the use of our methodology and the simulated results should be considered preliminary

  12. Preliminary Shielding Analysis for HCCB TBM Transport

    Science.gov (United States)

    Miao, Peng; Zhao, Fengchao; Cao, Qixiang; Zhang, Guoshu; Feng, Kaiming

    2015-09-01

    A preliminary shielding analysis on the transport of the Chinese helium cooled ceramic breeder test blanket module (HCCB TBM) from France back to China after being irradiated in ITER is presented in this contribution. Emphasis was placed on irradiation safety during transport. The dose rate calculated by MCNP/4C for the conceptual package design satisfies the relevant dose limits from IAEA that the dose rate 3 m away from the surface of the package containing low specific activity III materials should be less than 10 mSv/h. The change with location and the time evolution of dose rates after shutdown have also been studied. This will be helpful for devising the detailed transport plan of HCCB TBM back to China in the near future. supported by the Major State Basic Research Development Program of China (973 Program) (No. 2013GB108000)

  13. Mercury exposure on potential plant Ludwigia octovalvis L. - Preliminary toxicological testing

    Science.gov (United States)

    Alrawiq, Huda S. M.; Mushrifah, I.

    2013-11-01

    The preliminary test in phytoremediation is necessaryto determine the ability of plant to survive in media with different concentrations of contaminant. It was conducted to determine the maximum concentration of the contaminant that isharmful to the plant and suppress the plant growth. This study showed the ability of Ludwigia octovalvisto resist mercury (Hg) contaminant in sand containing different concentrations of Hg (0, 0.5, 1, 2, 4, 6 and 8 mg/L). The experimental work wasperformed under greenhouse conditions for an observation period of 4 weeks. Throughout the 4 weeks duration, the resultsshowed that 66.66% of the plants withered for on exposure to Hg concentration of 4 mg/L and 100% withered at higher concentrations of 6 and 8 mg/L. The results of this study may serve as a basis for research that aims to study uptake and accumulation of Hg using potential phytoremediation plants.

  14. A preliminary study on radiation damage effect in ceramics composite materials as innovative basic research using the HTTR

    International Nuclear Information System (INIS)

    Ishihara, Masahiro; Baba, Shinichi; Aihara, Jun; Arai, T.; Hayashi, K.; Ishino, S.

    1999-01-01

    An innovative basic research concerning with the basic science and applied technology is planned using the High Temperature Engineering Test Reactor (HTTR), which provides the advantage of not only a high temperature irradiation field above 400degC but also a large irradiation space. The first irradiation experiment is to be performed in 2001. Many research themes with a wide variety of scientific and technological interests are proposed as the innovative basic research. For the purpose of demonstration of scientific feasibility and advantages in the HTTR irradiation, several research themes have been being conducted as the preliminary studies. In this paper the outline of the innovative basic research is described, and the preliminary study on the radiation damage mechanism of ceramic composite materials is presented. (author)

  15. Personal strategic planning mobile application: preliminary study ...

    African Journals Online (AJOL)

    With the recent advances in the capabilities of smartphones and their growing penetration rate among the individuals, it is possible to take advantage of these devices to design a mobile application to promote personal strategic planning. The paper reviews relevant literature and designs an instrument to investigate the ...

  16. Plan for 3-D full-scale earthquake testing facility

    International Nuclear Information System (INIS)

    Ohtani, K.

    2001-01-01

    Based on the lessons learnt from the Great Hanshin-Awaji Earthquake, National Research Institute for Earth Science and Disaster Prevention plan to construct the 3-D Full-Scale Earthquake Testing Facility. This will be the world's largest and strongest shaking table facility. This paper describes the outline of the project for this facility. This facility will be completed in early 2005. (author)

  17. Project Rio Blanco definition plan. Additional formation evaluation and production testing

    International Nuclear Information System (INIS)

    1975-09-01

    Since the multiple Rio Blanco detonation three reentry wells have been drilled for test purposes: RB-E-01 (Emplacement Well); RB-AR-2 (Alternate Reentry Well); and RB-U-4 (Formation Evaluation Well). Additional testing in all these wells is now required to resolve some remaining technical questions. A plan describing the procedures, methods, responsibilities, and scheduling of the field operations is presented

  18. Setup of a testing environment for mission planning in mining

    NARCIS (Netherlands)

    Groenen, J.P.J.; Steinbuch, M.

    2013-01-01

    Mission planning algorithms for surface mining applications are difficult to test as a result of the large scale tasks. To validate these algorithms, a scaled setup is created where the mining excavator is mimicked by an industrial robot. This report discusses the development of a software

  19. Determination of hydraulic conductivity coefficient in NSD site, Serpong, based on in-situ permeability test method

    International Nuclear Information System (INIS)

    Heri Syaeful; Sucipta

    2013-01-01

    In line with the increase of amount of radioactive waste, PTLR-BATAN plans to build the Near Surface Disposal (NSD) facility, especially in the preliminary stages is the Demo Plant of NSD facility. NSD is a low to medium level radioactive waste storage concept. Most important aspect in the site study for planning NSD is hydrogeological aspect especially related to the migration of radionuclides to the environment. In the study of radionuclide migration, a preliminary parameter which is required to know is the hydraulic conductivity in order to deliver the soil and rock hydraulic conductivity values in the site then conducted the in-situ permeability test. Based on the test, obtained soil and rock hydraulic conductivity values ranging from 10 -6 to 10 -2 cm/sec. The greatest hydraulic conductivity value located in the gravelly silt soil units which is in the site, constitute as aquifer, with depth ranging from 8 - 24 m, with hydraulic conductivity value reached 10 -2 cm/sec. (author)

  20. Test plan for Enraf Series 854 level gauge wire testing

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1994-01-01

    An Enraf Series 854 level gauge was installed on tank 241-S-106 during the first week of June 1994. On August 11, 1994, the gauge's stainless steel measuring wire broke. After examination and laboratory analysis, it was determined that the wire broke due to severe chloride ion corrosion. It is suspected that the chloride ion contamination came from the radiation induced breakdown of the polyvinyl chloride (PVC) riser liner. It is well documented that the breakdown of PVC due to radiation produces chloride containing compounds. This document provides a qualification test plan to remove and have analyzed the wire in all of the Enraf Series 854 that have been installed to date. These tests will confirm the presence or absence of chloride ions in the PVC liners and/or on the Enraf measuring wires installed in the tanks. This test will involve removing the 316 stainless steel wire drums from all of the existing Enraf Series 854 level gauges that have been installed. New 316 stainless steel wire drums shall be installed into the gauges and the gauges will be placed back into service. The wire that is removed from the gauges shall be sent to the 222-S Lab or the Pacific Northwest Laboratory (PNL) for analysis. Additional wire replacements will occur at intervals as determined necessary by the results of the laboratory analyses

  1. Selenide isotope generator for the Galileo Mission: safety test plan

    International Nuclear Information System (INIS)

    1979-01-01

    The intent of this safety test plan is to outline particular kinds of safety tests designed to produce information which would be useful in the safety analysis process. The program deals primarily with the response of the RTG to accident environments; accordingly two criteria were established: (1) safety tests should be performed for environments which are the most critical in terms of risk contribution; and (2) tests should be formulated to determine failure conditions for critical heat source components rather than observe heat source response in reference accident environments. To satisfy criterion 1. results of a recent safety study were used to rank various accidents in terms of expected source terms. Six kinds of tests were then proposed which would provide information meeting the second criterion

  2. Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment

    Science.gov (United States)

    2003-09-22

    This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...

  3. Irradiation Planning for Fully-Ceramic Micro-encsapsulated fuel in ATR at LWR-relevant conditions: year-end report on FY-2011

    International Nuclear Information System (INIS)

    Ougouag, Abderrafi M.; Sen, R. Sonat; Pope, Michael A.; Boer, Brian

    2011-01-01

    This report presents the estimation of required ATR irradiation levels for the DB-FCM fuel design (fueled with Pu and MAs). The fuel and assembly designs are those considered in a companion report [R. S. Sen et al., FCRandD-2011- 00037 or INL/EXT-11-23269]. These results, pertaining to the DB-FCM fuel, are definitive in as much as the design of said fuel is definitive. In addition to the work performed, as required, for DB-FCM fuel, work has started in a preliminary fashion on single-cell UO2 and UN fuels. These latter activities go beyond the original charter of this project and although the corresponding work is incomplete, significant progress has been achieved. However, in this context, all that has been achieved is only preliminary because the corresponding fuel designs are neither finalized nor optimized. In particular, the UO2 case is unlikely to result in a viable fuel design if limited to enrichment at or under 20 weight % in U-235. The UN fuel allows reasonable length cycles and is likely to make an optimal design possible. Despite being limited to preliminary designs and offering only preliminary conclusions, the irradiation planning tasks for UO2 and UN fuels that are summarized in this report are useful to the overall goal of devising and deploying FCM-LWR fuel since the methods acquired and tested in this project and the overall procedure for planning will be available for planning tests for the finalized fuel design. Indeed, once the fuel design is finalized and the expected burnup level is determined, the methodology that has been assembled will allow the prompt finalization of the neutronic planning of the irradiation experiment and would provide guidance on the expected experimental performance of the fuel. Deviations from the expected behavior will then have to be analyzed and the outcome of the analysis may be corrections or modifications for the assessment models as well as, possibly, fuel design modifications, and perhaps even variation of

  4. 78 FR 12676 - Timing Requirements for the Submission of a Site Assessment Plan (SAP) or General Activities Plan...

    Science.gov (United States)

    2013-02-25

    ...: BOEM-2012-0077] RIN 1010-AD77 Timing Requirements for the Submission of a Site Assessment Plan (SAP) or... would amend the timing requirements for submitting a Site Assessment Plan (SAP) or General Activities... and grants will have a preliminary term of 12 months in which a lessee or grantee must submit a SAP or...

  5. GES [Ground Engineering System] test site preparation

    International Nuclear Information System (INIS)

    Cox, C.M.; Mahaffey, M.K.; Miller, W.C.; Schade, A.R.; Toyoda, K.G.

    1987-10-01

    Activities are under way at Hanford to convert the 309 containment building and its associated service wing to a nuclear test facility for the Ground Engineering System (GES) test. Conceptual design is about 80% complete, encompassing facility modifications, a secondary heat transport system, a large vacuum system, a test article cell and handing system, control and data handling systems, and safety andl auxiliary systems. The design makes extensive use of existing equipment to minimize technical risk and cost. Refurbishment of this equipment is 25% complete. Cleanout of some 1000 m 3 of equipment from the earlier reactor test in the facility is 85% complete. An Environmental Assessment was prepared and revised to incorporate Department of Energy (DOE) comments. It is now in the DOE approval chain, where a Finding of No Significant Impact is expected. During the next year, definite design will be well advanced, long-lead procurements will be initiated, construction planning will be completed, an operator training plan will be prepared, and the site (preliminary) safety analysis report will be drafted

  6. NWTS waste package program plan. Volume II. Program logic networks

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  7. Medical Audit: A Nigerian Teaching Hospital's Preliminary Experience

    African Journals Online (AJOL)

    The definition, historical background, aims dimensions and the characteristics of medical audit as well as the indices to be measured in a medical audit exercise are highlighted. The preliminary experience of the University of Ilorin Teaching Hospital (UITH) in the planning, implementation and monitoring of a viable medical ...

  8. Minnesota urban partnership agreement national evaluation : transit system data test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the test plan for collecting and analyzing transit system data for the Minnesota Urban Partnership Agreement (UPA) National Evaluation under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA...

  9. San Francisco urban partnership agreement, national evaluation : content analysis test plan.

    Science.gov (United States)

    2011-06-01

    This report presents the test plan for collecting and analyzing information on outreach activities, media coverage, : and reactions of the public, policy makers, and other groups to the UPA projects for the San Francisco Urban : Partnership Agreement...

  10. Preliminary socioeconomic and community planning studies

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Goldie W; Rivkin, Malcolm D [Rivkin Associates, Bethesda, MD (United States)

    1986-07-01

    The timing of resettlement on Bikini Atoll and the nature of a master plan to guide construction of a new community depend on four critical determinants which are not yet definitively known. The Bikini Atoll Rehabilitation Committee (BARC) and its consultants have been addressing three of these: a. How long it will take to restore Bikini Island, which will be the main settlement area, to a habitable state. The methods under investigation by BARC for decontaminating the island might be considered as alternatives or, possibly in combination. They vary considerably, not only with respect to cost, but also with respect to important factors such as: - how long it will take to decontaminate the island (i.e. to reduce radiation to levels acceptable within Federal standards), - the necessity of removing existing vegetation and the time and effort needed to restore environment and vegetation to a state sufficient to support a new community at a reasonable standard of amenity, - requirements for repeated or continual application of decontamination procedures (and associated risks), and - implications for potential constraints on the lifestyle of the people who resettle on Bikini Island. b. Adequacy of water resources (groundwater and rainwater catchment potential) on Bikini and Eneu Islands to support both revegetation as necessary, and a new community. c. The likely state of the Bikini people (size of the population, location(s), living conditions, financial commitments, etc.) at the time their atoll is ready for resettlement. d. The judgment and wishes of the Bikini people regarding a community plan in light of all the foregoing factors, once they become known.

  11. Preliminary socioeconomic and community planning studies

    International Nuclear Information System (INIS)

    Rivkin, Goldie W.; Rivkin, Malcolm D.

    1986-01-01

    The timing of resettlement on Bikini Atoll and the nature of a master plan to guide construction of a new community depend on four critical determinants which are not yet definitively known. The Bikini Atoll Rehabilitation Committee (BARC) and its consultants have been addressing three of these: a. How long it will take to restore Bikini Island, which will be the main settlement area, to a habitable state. The methods under investigation by BARC for decontaminating the island might be considered as alternatives or, possibly in combination. They vary considerably, not only with respect to cost, but also with respect to important factors such as: - how long it will take to decontaminate the island (i.e. to reduce radiation to levels acceptable within Federal standards), - the necessity of removing existing vegetation and the time and effort needed to restore environment and vegetation to a state sufficient to support a new community at a reasonable standard of amenity, - requirements for repeated or continual application of decontamination procedures (and associated risks), and - implications for potential constraints on the lifestyle of the people who resettle on Bikini Island. b. Adequacy of water resources (groundwater and rainwater catchment potential) on Bikini and Eneu Islands to support both revegetation as necessary, and a new community. c. The likely state of the Bikini people (size of the population, location(s), living conditions, financial commitments, etc.) at the time their atoll is ready for resettlement. d. The judgment and wishes of the Bikini people regarding a community plan in light of all the foregoing factors, once they become known

  12. Preliminary design package for solar collector and solar pump

    Science.gov (United States)

    1978-01-01

    A solar-operated pump using an existing solar collector, for use on solar heating and cooling and hot water systems is described. Preliminary design criteria of the collector and solar-powered pump is given including: design drawings, verification plans, and hazard analysis.

  13. Leak testing plan for the Oak Ridge National Laboratory liquid low- level waste system (active tanks)

    International Nuclear Information System (INIS)

    Douglas, D.G.; Wise, R.F.; Starr, J.W.; Maresca, J.W. Jr.

    1992-06-01

    A leak testing plan for a portion of the Liquid Low-Level Waste (LLLW) system at the Oak Ridge National Laboratory (ORNL) is provided in the two volumes that form this document. This plan was prepared in response to the requirements of the Federal Facilities Agreement (FFA) between the US Department of Energy and two other agencies, the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC). The effective date of this agreement was 1 January 1992. The LLLW system is an interconnected complex of tanks and pipelines. The FFA distinguishes four different categories of tank and pipeline systems within this complex: new systems (Category A), doubly contained systems (Category B), singly contained systems (Category C), and inactive systems (Category D). The FFA's specific requirements for leak testing of the Category C systems is addressed in this plan. The plan also addresses leak testing of the Category B portions of the LLLW system. Leak testing of the Category B components was brought into the plan to supplement the secondary containment design demonstration effort that is under way for these components

  14. The 3rd irradiation test plan of DUPIC fuel

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Myung Seung; Song, K. C.; Park, J. H. and others

    2001-05-01

    The objective of the 3rd irradiation test of DUPIC fuel at the HANARO is to estimate the in-core behaviour of a DUPIC pellet that is irradiated up to more than average burnup of CANDU fuel. The irradiation of DUPIC fuel is planned to start at May 21, 2001, and will be continued at least for 8 months. The burnup of DUPIC fuel through this irradiation test is thought to be more than 7,000 MWd/tHE. The DUPIC irradiation rig instrumented with three SPN detectors will be used to accumulate the experience for the instrumented irradiation and to estimate the burnup of irradiated DUPIC fuel more accurately. Under normal operating condition, the maximum linear power of DUPIC fuel was estimated as 55.06 kW/m, and the centerline temperature of a pellet was calculated as 2510 deg C. In order to assess the integrity of DUPIC fuel under the accident condition postulated at the HANARO, safety analyses on the locked rotor and reactivity insertion accidents were carried out. The maximum centerline temperature of DUPIC fuel was estimated 2590 deg C and 2094 deg C for each accident, respectively. From the results of the safety analysis, the integrity of DUPIC fuel during the HANARO irradiation test will be secured. The irradiated DUPIC fuel will be transported to the IMEF. The post-irradiation examinations are planned to be performed at the PIEF and IMEF.

  15. Minnesota urban partnership agreement national evaluation : traffic system data test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the traffic system data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employi...

  16. Minnesota urban partnership agreement national evaluation : cost benefit analysis test plan.

    Science.gov (United States)

    2009-11-17

    This report presents the cost benefit analysis test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by emplo...

  17. San Francisco urban partnership agreement, national evaluation : exogenous factors test plan.

    Science.gov (United States)

    2011-06-01

    This report presents the test plan for collecting and analyzing exogenous factors data for the San Francisco Urban : Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. : The San Francisco UPA proj...

  18. Field testing plan for unsaturated zone monitoring and field studies

    International Nuclear Information System (INIS)

    Young, M.H.; Wierenga, P.J.; Warrick, A.W.

    1996-10-01

    The University of Arizona, in cooperation with the Bureau of Economic Geology at The University of Texas at Austin, and Stephens and Associates in Albuquerque, New Mexico has developed a field testing plan for evaluating subsurface monitoring systems. The U.S. Nuclear Regulatory Commission has requested development of these testing plans for low-level radioactive waste disposal sites (LLW) and for monitoring at decommissioned facilities designated under the open-quotes Site Decommissioning Management Planclose quotes (SDMP). The tests are conducted on a 50 m by 50 m plot on the University of Arizona's Maricopa Agricultural Center. Within the 50 m by 50 m plot one finds: (1) an instrumented buried trench, (2) monitoring islands similar to those proposed for the Ward Valley, California LLW Facility, (3) deep borehole monitoring sites, (4) gaseous transport monitoring, and (5) locations for testing non-invasive geophysical measurement techniques. The various subplot areas are instrumented with commercially available instruments such as neutron probes, time domain reflectometry probes, tensiometers, psychrometers, heat dissipation sensors, thermocouples, solution samplers, and cross-hole geophysics electrodes. Measurement depths vary from ground surface to 15 m. The data from the controlled flow and transport experiments, conducted over the plot, will be used to develop an integrated approach to long-term monitoring of the vadose zone at waste disposal sites. The data will also be used to test field-scale flow and transport models. This report describes in detail the design of the experiment and the methodology proposed for evaluating the data

  19. Acceptance Sampling Plans Based on Truncated Life Tests for Sushila Distribution

    Directory of Open Access Journals (Sweden)

    Amer Ibrahim Al-Omari

    2018-03-01

    Full Text Available An acceptance sampling plan problem based on truncated life tests when the lifetime following a Sushila distribution is considered in this paper. For various acceptance numbers, confidence levels and values of the ratio between fixed experiment time and particular mean lifetime, the minimum sample sizes required to ascertain a specified mean life were found. The operating characteristic function values of the suggested sampling plans and the producer’s risk are presented. Some tables are provided and the results are illustrated by an example of a real data set.

  20. Preliminary assessment of RTR and visual characterization for selected waste categories

    International Nuclear Information System (INIS)

    Ziegler, D.L.

    1992-01-01

    The first transuranic (TRU) waste shipped to the Waste Isolation Pilot Plant (WIPP) will be for the WIPP Experimental Program. The purpose of the Experimental Program is to determine the gas generation rates and potential for gas generation by the waste after it has been permanently stored at the WIPP. The first phase of these tests will be performed at WIPP with test bins that have been filled and sealed in accordance with the test plan for bin scale tests. A second phase of the testing, the Alcove Test, will involve drummed waste placed in sealed rooms within WIPP. A preliminary test was conducted at the Rocky Flats Plant (RFP) to evaluate potential methods for use in the characterization of waste. The waste material types to be identified were as defined in the bin-scale test plan -- Cellulosics, Plastic, Rubber, Corroding Metal/Steel, Corroding Metal/Aluminum, Non-corroding Metal, Solid Inorganic, Inorganic Sludges, other organics and Cements. A total of 19 drums representing eleven different waste types (Rocky Flats Plant -- Identification Description Codes (IDC)) and seven different TRUCON Code materials were evaluated. They included Dry Combustibles, Wet Combustibles, Plastic, light Metal, Glass (Non-Raschig Ring). Raschig Rings, M g O crucibles, HEPA Filters, Insulation, Leaded Dry Box Gloves, and Graphite. These Identification Description Codes were chosen because of their abundance on plant, as well as the variability in drum loading techniques. The goal of this test was to evaluate the effectiveness of RTR inspection and visual inspection as characterization methods for waste. In addition, gas analysis of the head space was conducted to provide an indication of the types of gas generated

  1. Preliminary tests of a high speed vertical axis windmill model

    Energy Technology Data Exchange (ETDEWEB)

    South, P; Rangi, R S

    1971-01-01

    This report discusses a fixed-pitch vertical axis windmill that combines the inherent simplicity of this type of machine with a high aerodynamic efficiency and a high relative velocity. A three-bladed rotor was selected as the basic design, having constant chord symmetric airfoil blades configured in a catenary curve such that the rotor diameter is equal to the rotor height. In wind tunnel tests using a 30 inch scale model, it was found that once this rotor was given a very low rotational speed, it picked up speed and ran at a rotor tip velocity/wind speed ratio greater than 1. The number of blades was varied in the testing. A maximum power coefficient of 0.67 was achieved at 17 ft/s wind speed at a tip speed/wind speed ratio of 7.25 for a 2-bladed rotor. Increasing the number of blades above 3 did not result in higher power. The rotor could operate in gusts which double the mean wind velocity. Examination of Reynolds number effects, and taking into account the scale of the model, it was concluded that a full-scale windmill could run at lower velocity ratios than those predicted by the model tests, and that it could self-start under no-load conditions if the cut-in rpm are at least half the rpm for maximum power at the prevailing wind speed. Preliminary estimates show that a 15 ft diameter windmill of this design, designed to operate with a safety factor of 2.5 up to a maximum wind speed of 60 ft/s, would weigh ca 150 lb and could be marketed for ca $60.00, excluding the driven unit, if sufficient quantities were produced to make tooling costs negligible. Similarly, a 30 ft windmill would weigh ca 1000 lb and cost ca $400.00. 2 refs., 6 figs.

  2. Efficient preliminary floating offshore wind turbine design and testing methodologies and application to a concrete spar design

    OpenAIRE

    Matha, Denis; Sandner, Frank; Molins i Borrell, Climent; Campos Hortigüela, Alexis; Cheng, Po Wen

    2015-01-01

    The current key challenge in the floating offshore wind turbine industry and research is on designing economic floating systems that can compete with fixed-bottom offshore turbines in terms of levelized cost of energy. The preliminary platform design, as well as early experimental design assessments, are critical elements in the overall design process. In this contribution, a brief review of current floating offshore wind turbine platform pre-design and scaled testing methodologies is provide...

  3. Regional cooperation for emergency plan

    International Nuclear Information System (INIS)

    Chu, D.S.L.; Liu, P.C.

    1981-01-01

    It has become increasingly evident since the Three Mile Island (TMI) accident that a sound emergency plan is indispensable to the overall nuclear power generation program. In some developing countries in Eastern Aisa, the availability of manpower resources and facilities to handle a nuclear power plant accident are rather limited. Therefore, the establishment of a regional mutual emergency plan is deemed necessary. A preliminary idea concerning this establishment is presented for deliberation by this Conference

  4. A systematic process for developing and assessing accident management plans

    International Nuclear Information System (INIS)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W.

    1991-04-01

    This document describes a four-phase approach for developing criteria recommended for use in assessing the adequacy of nuclear power plant accident management plans. Two phases of the approach have been completed and provide a prototype process that could be used to develop an accident management plan. Based on this process, a preliminary set of assessment criteria are derived. These preliminary criteria will be refined and improved when the remaining steps of the approach are completed, that is, after the prototype process is validated through application. 9 refs., 10 figs., 7 tabs

  5. Preliminary research on eddy current bobbin quantitative test for heat exchange tube in nuclear power plant

    Science.gov (United States)

    Qi, Pan; Shao, Wenbin; Liao, Shusheng

    2016-02-01

    For quantitative defects detection research on heat transfer tube in nuclear power plants (NPP), two parts of work are carried out based on the crack as the main research objects. (1) Production optimization of calibration tube. Firstly, ASME, RSEM and homemade crack calibration tubes are applied to quantitatively analyze the defects depth on other designed crack test tubes, and then the judgment with quantitative results under crack calibration tube with more accuracy is given. Base on that, weight analysis of influence factors for crack depth quantitative test such as crack orientation, length, volume and so on can be undertaken, which will optimize manufacture technology of calibration tubes. (2) Quantitative optimization of crack depth. Neural network model with multi-calibration curve adopted to optimize natural crack test depth generated in in-service tubes shows preliminary ability to improve quantitative accuracy.

  6. Test plan for evaluation of plasma melter technology for vitrification of high-sodium content low-level radioactive liquid wastes

    International Nuclear Information System (INIS)

    McLaughlin, D.F.; Lahoda, E.J.; Gass, W.R.; D'Amico, N.

    1994-01-01

    This document provides a test plan for the conduct of plasma arc vitrification testing by a vendor in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. The vendor providing this test plan and conducting the work detailed within it [one of seven selected for glass melter testing under Purchase Order MMI-SVV-384212] is the Westinghouse Science and Technology Center (WSTC) in Pittsburgh, PA. WSTC authors of the test plan are D. F. McLaughlin, E. J. Lahoda, W. R. Gass, and N. D'Amico. The WSTC Program Manager for this test is D. F. McLaughlin. This test plan is for Phase I activities described in the above Purchase Order. Test conduct includes melting of glass frit with Hanford LLW Double-Shell Slurry Feed waste simulant in a plasma arc fired furnace

  7. Preliminary design package for solar heating and hot water system

    Science.gov (United States)

    1976-01-01

    Two prototype solar heating and hot water systems for use in single-family dwellings or commercial buildings were designed. Subsystems included are: collector, storage, transport, hot water, auxiliary energy, and government-furnished site data acquisition. The systems are designed for Yosemite, California, and Pueblo, Colorado. The necessary information to evaluate the preliminary design for these solar heating and hot water systems is presented. Included are a proposed instrumentation plan, a training program, hazard analysis, preliminary design drawings, and other information about the design of the system.

  8. Preliminary evaluation of 30 potential granitic rock sites for a radioactive waste storage facility in southern Nevada

    International Nuclear Information System (INIS)

    Boardman, C.R.; Knutson, C.F.

    1978-01-01

    Results of preliminary study are presented which was performed under subtask 2.7 of the NTS Terminal Waste Storage Program Plan for 1978. Subtask 2.7 examines the feasibility of locating a nuclear waste repository in a granitic stock or pluton in southern Nevada near the Nevada Test Site (NTS). It is assumed for the purposes of this study that such a repository cannot be located at NTS. This assumption may or may not be correct. This preliminary report does not identify a particular site as being a suitable location for a repository. Nor does it absolutely eliminate a particular site from further consideration. It does, however, answer the basic question of probable suitability of some of the sites and present a systematic method for site evaluation. Since the findings of this initial study have been favorable, it will be followed by more exhaustive and detailed studies of the original 30 sites and perhaps others. In future studies some of the evaluation criteria used in the preliminary study may be modified or eliminated, and new criteria may be introduced

  9. Preliminary evaluation of 30 potential granitic rock sites for a radioactive waste storage facility in southern Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Boardman, C.R.; Knutson, C.F.

    1978-02-15

    Results of preliminary study are presented which was performed under subtask 2.7 of the NTS Terminal Waste Storage Program Plan for 1978. Subtask 2.7 examines the feasibility of locating a nuclear waste repository in a granitic stock or pluton in southern Nevada near the Nevada Test Site (NTS). It is assumed for the purposes of this study that such a repository cannot be located at NTS. This assumption may or may not be correct. This preliminary report does not identify a particular site as being a suitable location for a repository. Nor does it absolutely eliminate a particular site from further consideration. It does, however, answer the basic question of probable suitability of some of the sites and present a systematic method for site evaluation. Since the findings of this initial study have been favorable, it will be followed by more exhaustive and detailed studies of the original 30 sites and perhaps others. In future studies some of the evaluation criteria used in the preliminary study may be modified or eliminated, and new criteria may be introduced.

  10. MALLARD REPRODUCTIVE TESTING IN A POND ENVIRONMENT: A PRELIMINARY STUDY

    Science.gov (United States)

    A 2-year preliminary study was conducted on mallard ducks to determine the feasibility of using outdoor pond enclosures for reproductive studies and to evaluate the effects of the insecticide chlorpyrifos on mallard reproduction. No significant reproductive effects were observed ...

  11. Status and future plans of the Drones for Aerodynamic and Structural Testing (DAST) program. [Aeroelastic Research Wing (ARW)

    Science.gov (United States)

    Murrow, H. N.

    1981-01-01

    Results from flight tests of the ARW-1 research wing are presented. Preliminary loads data and experiences with the active control system for flutter suppression are included along with comparative results of test and prediction for the flutter boundary of the supercritical research wing and on performance of the flutter suppression system. The status of the ARW-2 research wing is given.

  12. Performance assessment plans and methods for the Salt Repository Project

    International Nuclear Information System (INIS)

    1984-08-01

    This document presents the preliminary plans and anticipated methods of the Salt Repository Project (SRP) for assessing the postclosure and radiological aspects of preclosure performance of a nuclear waste repository in salt. This plan is intended to be revised on an annual basis. The emphasis in this preliminary effort is on the method of conceptually dividing the system into three subsystems (the very near field, the near field, and the far field) and applying models to analyze the behavior of each subsystem and its individual components. The next revision will contain more detailed plans being developed as part of Site Characterization Plan (SCP) activities. After a brief system description, this plan presents the performance targets which have been established for nuclear waste repositories by regulatory agencies (Chapter 3). The SRP approach to modeling, including sensitivity and uncertainty techniques is then presented (Chapter 4). This is followed by a discussion of scenario analysis (Chapter 5), a presentation of preliminary data needs as anticipated by the SRP (Chapter 6), and a presentation of the SRP approach to postclosure assessment of the very near field, the near field, and the far field (Chapters 7, 8, and 9, respectively). Preclosure radiological assessment is discussed in Chapter 10. Chapter 11 presents the SRP approach to code verification and validation. Finally, the Appendix lists all computer codes anticipated for use in performance assessments. The list of codes will be updated as plans are revised

  13. 100 Area soil washing treatability test plan

    International Nuclear Information System (INIS)

    1993-03-01

    This test plan describes specifications, responsibilities, and general methodology for conducting a soil washing treatability study as applied to source unit contamination in the 100 Area. The objective ofthis treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. The purpose of separating these fractions is to minimize the volume of soil requiring permanent disposal. It is anticipated that this treatability study will be performed in two phases of testing, a remedy screening phase and a remedy selection phase. The remedy screening phase consists of laboratory- and bench-scale studies performed by Battelle Pacific Northwest laboratories (PNL) under a work order issued by Westinghouse Hanford Company (Westinghouse Hanford). This phase will be used to provide qualitative evaluation of the potential effectiveness of the soil washing technology. The remedy selection phase, consists of pilot-scale testing performed under a separate service contract to be competitively bid under Westinghouse Hanford direction. The remedy selection phase will provide data to support evaluation of the soil washing technology in future feasibility studies for Interim Remedial Measures (IRMs) or final operable unit (OU) remedies. Performance data from these tests will indicate whether applicable or relevant and appropriate requirements (ARARs) or cleanup goals can be met at the site(s) by application of soil washing. The remedy selection tests wig also allow estimation of costs associated with implementation to the accuracy required for the Feasibility Study

  14. 10 CFR Appendix A to Subpart U of... - Sampling Plan for Enforcement Testing of Electric Motors

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sampling Plan for Enforcement Testing of Electric Motors A Appendix A to Subpart U of Part 431 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY... to Subpart U of Part 431—Sampling Plan for Enforcement Testing of Electric Motors Step 1. The first...

  15. Light ion production for a future radiobiological facility at CERN: preliminary studies.

    Science.gov (United States)

    Stafford-Haworth, Joshua; Bellodi, Giulia; Küchler, Detlef; Lombardi, Alessandra; Röhrich, Jörg; Scrivens, Richard

    2014-02-01

    Recent medical applications of ions such as carbon and helium have proved extremely effective for the treatment of human patients. However, before now a comprehensive study of the effects of different light ions on organic targets has not been completed. There is a strong desire for a dedicated facility which can produce ions in the range of protons to neon in order to perform this study. This paper will present the proposal and preliminary investigations into the production of light ions, and the development of a radiobiological research facility at CERN. The aims of this project will be presented along with the modifications required to the existing linear accelerator (Linac3), and the foreseen facility, including the requirements for an ion source in terms of some of the specification parameters and the flexibility of operation for different ion types. Preliminary results from beam transport simulations will be presented, in addition to some planned tests required to produce some of the required light ions (lithium, boron) to be conducted in collaboration with the Helmholtz-Zentrum für Materialien und Energie, Berlin.

  16. Emotional profiles to the Rorschach test in subjects affected by Central Serous Chorioretinopathy: preliminary observations

    Directory of Open Access Journals (Sweden)

    Giovanna Gioffrè

    2013-05-01

    Full Text Available Psychological variables could be related to disorders of vision with particular interest of depressive feautures, but with little attention to dimensions such as stress and anxiety. Psychological stress associated with hyperactivation of the sympathetic autonomic nervous system, is considered the most important risk factor of a rare disorder of vision, the Central Serous Chorioretinopathy (CSC, whose etiology has not yet been clarified. This study to examine the psychological literature regarding to CSC and explore in a preliminary the projective methods of the Rorschach test, any correlations between personality variables and predisposition to CSC.

  17. Design of a New Research Reactor: Preliminary Conceptual Design (3rd Year)

    International Nuclear Information System (INIS)

    Park, Cheol; Lee, B. C.; Chae, H. T. and others

    2006-01-01

    A research reactor design is a kind of integral engineering project and a process to obtain a concrete shape through several years of concept development, conceptual design, basic design and detail design. So it requires close cooperation in various areas as well as lots of manpower and cost. The overall process at each stage may be said to be similar except for some stage-specific works. In 2005 as last year of a concept development stage, investigations on the various concepts of the fuel, reactor structure and systems which can meet the requirements established. The requirements for the process systems and I and C systems have also been embodied. The major tasks planned at the early of 2005 have been performed for each area of reactor design as follows: Establishment of the fuel and reactor core concept, and the core analysis, Preliminary thermal-hydraulic and safety analyses for the conceptual cores, Establishment and improvement of analysis system, Concept developments of the reactor structures and major systems, Test and test plan to verify the developed concepts, International cooperation to establish the foundations for exporting a research reactor

  18. Test plan for qualification of the S-type fiberglass materials for use as the liquid observation well casing

    International Nuclear Information System (INIS)

    Parra, S.A.

    1995-01-01

    This test plan presents the guidelines and requirements for acceptance of the S-type fiberglass material for use as the liquid observation well casing material. The plan for evaluating the physical properties of the candidate fiberglass materials when subjected to radiation, corrosive chemicals, and high temperatures typically found in the waste tanks are outlined. The tests also include tube connection evaluations. Finally, the test plan identifies the participants, their responsibilities, and the schedule for completion of the work

  19. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  20. STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITY NEVADA TEST SITE, NEVADA

    International Nuclear Information System (INIS)

    2006-01-01

    This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada

  1. MHD program plan, FY 1991

    Science.gov (United States)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  2. Preliminary Sensorimotor and Cardiovascular Results from the Joint Russian and U.S. Pilot Field Test with Planning for the Full Field Test Beginning with the Year Long Intenational Space Station

    Science.gov (United States)

    Reschke, M. F.; Kozlovskaya, I. B.; Tomilovskaya, E. S.; Bloomberg, J. J.; Platts, S. H.; Rukavishnikov, I. V.; Fomina, E. V.; Stenger, M. B.; Lee, S. M. C.; Wood, S. J.; hide

    2014-01-01

    Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short duration (Space Shuttle) and long duration (Mir and International Space Station) space flights. While the unloading paradigms associated with dry immersion and bed rest does serve as acceptable flight analogs, testing of crew responses following the long duration flights previously has not been possible until a minimum of 24 hours after landing. As a result, it is not possible to estimate the nonlinear trend of the early (testing at landing site. By joint agreement, this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long duration space flight crews beginning as soon after landing as possible (test in conjunction with postural ataxia testing (quiet stance sway) as well as cardiovascular responses during other functional tasks. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired at a minimum of one to three more other times within the 24 hr following landing and continue until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of jointly agreed upon subset of tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content and implementation. The PFT was first conducted following the September 2013 landing of the Soyuz spacecraft (34S) and again following the landing of Soyuz 35S in November

  3. Tracer gas diffusion sampling test plan

    International Nuclear Information System (INIS)

    Rohay, V.J.

    1993-01-01

    Efforts are under way to employ active and passive vapor extraction to remove carbon tetrachloride from the soil in the 200 West Area an the Hanford Site as part of the 200 West Area Carbon Tetrachloride Expedited Response Action. In the active approach, a vacuum is applied to a well, which causes soil gas surrounding the well to be drawn up to the surface. The contaminated air is cleaned by passage through a granular activated carbon bed. There are questions concerning the radius of influence associated with application of the vacuum system and related uncertainties about the soil-gas diffusion rates with and without the vacuum system present. To address these questions, a series of tracer gas diffusion sampling tests is proposed in which an inert, nontoxic tracer gas, sulfur hexafluoride (SF 6 ), will be injected into a well, and the rates of SF 6 diffusion through the surrounding soil horizon will be measured by sampling in nearby wells. Tracer gas tests will be conducted at sites very near the active vacuum extraction system and also at sites beyond the radius of influence of the active vacuum system. In the passive vapor extraction approach, barometric pressure fluctuations cause soil gas to be drawn to the surface through the well. At the passive sites, the effects of barometric ''pumping'' due to changes in atmospheric pressure will be investigated. Application of tracer gas testing to both the active and passive vapor extraction methods is described in the wellfield enhancement work plan (Rohay and Cameron 1993)

  4. Test/QA plan for the verification testing of selective catalytic reduction control technologies for highway, nonroad use heavy-duty diesel engines

    Science.gov (United States)

    This ETV test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research (DER) describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR Part 89 for nonroad engines, will be ...

  5. Post-Occupancy Evaluation Data Support for Planning and Management of Building Maintenance Plans

    Directory of Open Access Journals (Sweden)

    Nelson Bento Pereira

    2016-10-01

    Full Text Available The purpose of this paper is to propose a post-occupancy evaluation (POE method focused on building maintenance and then to test it on two different sets of residential buildings. The paper’s three main goals are: to obtain useful data for optimizing the buildings’ maintenance plans; to search for any correlation between the occupants’ characteristics and their expectations toward the building; to study the occupants’ willingness to pay for maintenance procedures, as well as its correlation with the occupants’ perception of the elements source of maintenance (ESM. The proposed POE method for building maintenance performance evaluation (BMPE consists of six main stages, focusing on the occupants’ opinions and their correlation with the facility manager’s. The observed case studies allowed for a preliminary validation of the POE method for BMPE. Results generically endorsed the method as a valuable tool for the rapprochement between facility management and the building’s end-users. Such findings could allow facility managers to develop more efficient maintenance plans focusing on the occupants’ real needs and expectations, raising occupant satisfaction levels and contributing to the building’s general performance.

  6. Development and Preliminary Testing of a High Precision Long Stroke Slit Change Mechanism for the SPICE Instrument

    Science.gov (United States)

    Paciotti, Gabriel; Humphries, Martin; Rottmeier, Fabrice; Blecha, Luc

    2014-01-01

    In the frame of ESA's Solar Orbiter scientific mission, Almatech has been selected to design, develop and test the Slit Change Mechanism of the SPICE (SPectral Imaging of the Coronal Environment) instrument. In order to guaranty optical cleanliness level while fulfilling stringent positioning accuracies and repeatability requirements for slit positioning in the optical path of the instrument, a linear guiding system based on a double flexible blade arrangement has been selected. The four different slits to be used for the SPICE instrument resulted in a total stroke of 16.5 mm in this linear slit changer arrangement. The combination of long stroke and high precision positioning requirements has been identified as the main design challenge to be validated through breadboard models testing. This paper presents the development of SPICE's Slit Change Mechanism (SCM) and the two-step validation tests successfully performed on breadboard models of its flexible blade support system. The validation test results have demonstrated the full adequacy of the flexible blade guiding system implemented in SPICE's Slit Change Mechanism in a stand-alone configuration. Further breadboard test results, studying the influence of the compliant connection to the SCM linear actuator on an enhanced flexible guiding system design have shown significant enhancements in the positioning accuracy and repeatability of the selected flexible guiding system. Preliminary evaluation of the linear actuator design, including a detailed tolerance analyses, has shown the suitability of this satellite roller screw based mechanism for the actuation of the tested flexible guiding system and compliant connection. The presented development and preliminary testing of the high-precision long-stroke Slit Change Mechanism for the SPICE Instrument are considered fully successful such that future tests considering the full Slit Change Mechanism can be performed, with the gained confidence, directly on a

  7. Gas liquid sampling for closed canisters in KW Basin - test plan

    International Nuclear Information System (INIS)

    Pitkoff, C.C.

    1995-01-01

    Test procedures for the gas/liquid sampler. Characterization of the Spent Nuclear Fuel, SNF, sealed in canisters at KW-Basin is needed to determine the state of storing SNF wet. Samples of the liquid and the gas in the closed canisters will be taken to gain characterization information. Sampling equipment has been designed to retrieve gas and liquid from the closed canisters in KW basin. This plan is written to outline the test requirements for this developmental sampling equipment

  8. Preliminary waste acceptance requirements - Konrad repository project

    International Nuclear Information System (INIS)

    Brennecke, P.W.; Warnecke, E.H.

    1991-01-01

    In Germany, the planned Konrad repository is proposed for the disposal of all types of radioactive wastes whose thermal influence upon the host rock is negligible. The Bundesamt fuer Strahlenschutz has established Preliminary Waste Acceptance Requirements (as of April 1990) for this facility. The respective requirements were developed on the basis of the results of site-specific safety assessments. They include general requirements on the waste packages to be disposed of as well as more specific requirements on the waste forms, the packaging and the radionuclide inventory per waste package. In addition, the delivery of waste packages was regulated. An outline of the structure and the elements of the Preliminary Waste Acceptance Requirements of April 1990 is given including comments on their legal status. (Author)

  9. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...

  10. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Operational Area Monitoring Plan for environmental monitoring, is for EG ampersand G Energy Measurements, Inc. (EG ampersand G/EM) which operates several offsite facilities in support of activities at the Nevada Test Site (NTS). These facilities include: (1) Amador Valley Operations (AVO), Pleasanton, California; (2) Kirtland Operations (KO), Kirtland Air Force base, Albuquerque, New Mexico (KAFB); (3) Las Vegas Area Operations (LVAO), Remote Sensing Laboratory (RSL), and North Las Vegas (NLV) Complex at Nellis Air Force Base (NAFB), North Las Vegas, Nevada; (4) Los Alamos Operations (LAO), Los Alamos, New Mexico; (5) Santa Barbara Operations (SBO), Goleta, California; (6) Special Technologies Laboratory (STL), Santa Barbara, California; (7) Washington Aerial Measurements Department (WAMD), Andrews Air Force Base, Maryland; and, (8) Woburn Cathode Ray Tube Operations (WCO), Woburn, Massachusetts. Each of these facilities has an individual Operational Area Monitoring Plan, but they have been consolidated herein to reduce redundancy

  11. Modeling and Field Test Planning Activities in Support of Disposal of Heat-Generating Waste in Salt

    Energy Technology Data Exchange (ETDEWEB)

    Rutqvist, Jonny; Blanco Martin, Laura; Mukhopadhyay, Sumit; Houseworth, Jim; Birkholzer, Jens

    2014-09-26

    The modeling efforts in support of the field test planning conducted at LBNL leverage on recent developments of tools for modeling coupled thermal-hydrological-mechanical-chemical (THMC) processes in salt and their effect on brine migration at high temperatures. This work includes development related to, and implementation of, essential capabilities, as well as testing the model against relevant information and published experimental data related to the fate and transport of water. These are modeling capabilities that will be suitable for assisting in the design of field experiment, especially related to multiphase flow processes coupled with mechanical deformations, at high temperature. In this report, we first examine previous generic repository modeling results, focusing on the first 20 years to investigate the expected evolution of the different processes that could be monitored in a full-scale heater experiment, and then present new results from ongoing modeling of the Thermal Simulation for Drift Emplacement (TSDE) experiment, a heater experiment on the in-drift emplacement concept at the Asse Mine, Germany, and provide an update on the ongoing model developments for modeling brine migration. LBNL also supported field test planning activities via contributions to and technical review of framework documents and test plans, as well as participation in workshops associated with field test planning.

  12. Preliminary I&C Design for LORELEI

    International Nuclear Information System (INIS)

    Korotkin, S.; Kaufman, Y.; Guttmann, E. B.; Levy, S.; Amidan, D.; Gdalyho, B.; Cahana, T.; Ellenbogen, A.; Arad, M.; Weiss, Y.; Sasson, A.; Ferry, L.; Bourrelly, F.; Cohen, Y.

    2014-01-01

    This document summarizes the preliminary I&C design for LORELEI experiment The preliminary design deals with considerations regarding appropriate safety and service instrumentation. The determined closed loop control rules for temperature and position will be implemented in the detailed design. The Computer Aided Operator Decisions System (CAODS) will be used for prediction of hot spot temperature and thickness of oxidation layer using Baker-Just correlation. The proposed hybrid simulation system comprising of both virtual and real hardware will be in-cooperated for LORELEI verification. It will perform both integration cold tests for a partial hardware loop and virtual tests for the final I&C design

  13. Contraceptive social marketing: a continuous cycle of planning, testing and evaluating.

    Science.gov (United States)

    1985-01-01

    This article outlines the contraceptive marketing process used by the Social Marketing for Change (SOMARC) project. The 1st stage of the process involves analysis of the market, the consumer, and the social marketing organization's capabilities. In the 2nd stage, planning, data collected in the analysis stage are used to define objectives, segment target markets, and devise strategies for each element in the marketing mix. In the 3rd stage, all the elements in the marketing mix are developed and tested (e.g. product concepts, pricing, packaging, communication messages) and refined on the basis of test results. In stage 4, the action plan is implemented and marketing progress and institutional performance are monitored. Stage 5 includes an assessment of in-market effectiveness in terms of responses from consumers, retailers, and health professionals. The last stage feeds back to the 1st. All the reviewed data are recycled into analysis to begin again the continuous process of refinement and improvement.

  14. Optimizing Hybrid Occlusion in Face-Jaw-Teeth Transplantation: A Preliminary Assessment of Real-Time Cephalometry as Part of the Computer-Assisted Planning and Execution Workstation for Craniomaxillofacial Surgery.

    Science.gov (United States)

    Murphy, Ryan J; Basafa, Ehsan; Hashemi, Sepehr; Grant, Gerald T; Liacouras, Peter; Susarla, Srinivas M; Otake, Yoshito; Santiago, Gabriel; Armand, Mehran; Gordon, Chad R

    2015-08-01

    The aesthetic and functional outcomes surrounding Le Fort-based, face-jaw-teeth transplantation have been suboptimal, often leading to posttransplant class II/III skeletal profiles, palatal defects, and "hybrid malocclusion." Therefore, a novel technology-real-time cephalometry-was developed to provide the surgical team instantaneous, intraoperative knowledge of three-dimensional dentoskeletal parameters. Mock face-jaw-teeth transplantation operations were performed on plastic and cadaveric human donor/recipient pairs (n = 2). Preoperatively, cephalometric landmarks were identified on donor/recipient skeletons using segmented computed tomographic scans. The computer-assisted planning and execution workstation tracked the position of the donor face-jaw-teeth segment in real time during the placement/inset onto recipient, reporting pertinent hybrid cephalometric parameters from any movement of donor tissue. The intraoperative data measured through real-time cephalometry were compared to posttransplant measurements for accuracy assessment. In addition, posttransplant cephalometric relationships were compared to planned outcomes to determine face-jaw-teeth transplantation success. Compared with postoperative data, the real-time cephalometry-calculated intraoperative measurement errors were 1.37 ± 1.11 mm and 0.45 ± 0.28 degrees for the plastic skull and 2.99 ± 2.24 mm and 2.63 ± 1.33 degrees for the human cadaver experiments. These results were comparable to the posttransplant relations to planned outcome (human cadaver experiment, 1.39 ± 1.81 mm and 2.18 ± 1.88 degrees; plastic skull experiment, 1.06 ± 0.63 mm and 0.53 ± 0.39 degrees). Based on this preliminary testing, real-time cephalometry may be a valuable adjunct for adjusting and measuring "hybrid occlusion" in face-jaw-teeth transplantation and other orthognathic surgical procedures.

  15. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  16. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  17. Short-Run Contexts and Imperfect Testing for Continuous Sampling Plans

    Directory of Open Access Journals (Sweden)

    Mirella Rodriguez

    2018-04-01

    Full Text Available Continuous sampling plans are used to ensure a high level of quality for items produced in long-run contexts. The basic idea of these plans is to alternate between 100% inspection and a reduced rate of inspection frequency. Any inspected item that is found to be defective is replaced with a non-defective item. Because not all items are inspected, some defective items will escape to the customer. Analytical formulas have been developed that measure both the customer perceived quality and also the level of inspection effort. The analysis of continuous sampling plans does not apply to short-run contexts, where only a finite-size batch of items is to be produced. In this paper, a simulation algorithm is designed and implemented to analyze the customer perceived quality and the level of inspection effort for short-run contexts. A parameter representing the effectiveness of the test used during inspection is introduced to the analysis, and an analytical approximation is discussed. An application of the simulation algorithm that helped answer questions for the U.S. Navy is discussed.

  18. In-situ failure test in the research tunnel at Olkiluoto

    Energy Technology Data Exchange (ETDEWEB)

    Autio, J.; Johansson, E.; Kirkkomaeki, T. [Saanio and Riekkola Consulting Engineers, Helsinki (Finland); Hakala, M. [Gridpoint Finland Oy (Finland); Heikkilae, E. [Helsinki Univ. of Technology, Otaniemi (Finland). Lab. of Rock Engineering

    2000-05-01

    A failure test suitable for execution in the Research Tunnel at Olkiluoto has been planned to study the failure of rock in-situ. The objectives of the in-situ failure test is to assess the applicability of numerical modelling codes and methods to the study of rock failure and associated crack propagation and to develop a novel technique to be used to determine the strength of rock in-situ. The objective of this study was to make a preliminary design of the failure test, assess the technical feasibility of the test and to give input information for further numerical modelling of the test. The design of the failure test is reported and results of preliminary modelling are given. The input information for future modelling includes a study of rock properties, fracture propagation in rock, in-situ stresses and the development of techniques for using the expanding agent to produce artificial stress field. The study showed that mechanical properties such as strength of gneissic tonalite, the main rock type in the Research Tunnel, depends highly on the orientation of schistocity. The in-situ failure test was shown to be technically feasible and a state of stress high enough to cause failure can be created artificially by using a proper expansive agent and design. (orig.)

  19. Preliminary tests in skull pediatric phantom for dosimetry in computerized tomography

    International Nuclear Information System (INIS)

    Martins, Elaine Wirney; Potiens, Maria da Penha de A.

    2014-01-01

    Computed tomography (CT) is one of the techniques in the field of radiology with striking technological advance in recent years. One reason for this was the increased number of channels associated with the increased power of the X-ray tube. These conditions allowed the equipment high speed in the acquisition of the cuts, reducing the patient exposure time essential characteristic for the increase of its use in pediatric patients. In this context, were developed a new pediatric skull simulator to analyze the results of measurements performed in laboratory and clinic beams with the objective of creation and use of diagnostic reference levels observing risks stochastic effects and assessing the reduction of absorbed doses in patients undergoing growing. Preliminary tests performed in clinical beams showed C w values: 2.525 ± 0.212 mGy for the developed simulator quoted and 3.362 ± 0.282 mGy for a simulator developed by IPEN called standard, both being between uncertainty values of 8.4% and 14.4% suggested by TRS number 457

  20. Test plan for reactions between spent fuel and J-13 well water under unsaturated conditions

    International Nuclear Information System (INIS)

    Finn, P.A.; Wronkiewicz, D.J.; Hoh, J.C.; Emery, J.W.; Hafenrichter, L.D.; Bates, J.K.

    1993-01-01

    The Yucca Mountain Site Characterization Project is evaluating the long-term performance of a high-level nuclear waste form, spent fuel from commercial reactors. Permanent disposal of the spent fuel is possible in a potential repository to be located in the volcanic tuff beds near Yucca Mountain, Nevada. During the post-containment period the spent fuel could be exposed to water condensation since of the cladding is assumed to fail during this time. Spent fuel leach (SFL) tests are designed to simulate and monitor the release of radionuclides from the spent fuel under this condition. This Test Plan addresses the anticipated conditions whereby spent fuel is contacted by small amounts of water that trickle through the spent fuel container. Two complentary test plans are presented, one to examine the reaction of spent fuel and J-13 well water under unsaturated conditions and the second to examine the reaction of unirradiated UO 2 pellets and J-13 well water under unsaturated conditions. The former test plan examines the importance of the water content, the oxygen content as affected by radiolysis, the fuel burnup, fuel surface area, and temperature. The latter test plant examines the effect of the non-presence of Teflon in the test vessel