WorldWideScience

Sample records for preliminary project implementation

  1. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  2. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  3. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  4. Implementing CDIO project-based learning in training of Heat and Power engineers

    Science.gov (United States)

    Boiko, E. A.; Shishmarev, P. V.; Karabarin, D. I.; Yanov, S. R.; Pikalova, A. A.

    2017-11-01

    This paper presents the experience and current results of CDIO standards implementation in training of bachelors in Heat and Power Engineering at Thermal Power Stations academic department in Siberian Federal University. It provides information on methodology of modernization of educational programs, curricula and programs of disciplines in transition to CDIO project-based learning technology. Preliminary assessment and analysis of lessons learned and scaling perspectives are given.

  5. Federal subsidies for preliminary studies for small-scale hydropower installations: degree of implementation of preliminary study projects 1993-2001 - Short evaluation of the effect of federal subsidies; Bundesbeitraege an Vorstudien fuer Kleinwasserkraftwerke. Realisierungsstand der Vorstudienprojekte 1993 bis 2001. Kurzevaluation der Auswirkungen der Bundesbeitraege (1996)

    Energy Technology Data Exchange (ETDEWEB)

    Kuster, J.; Suter, Ph.

    2002-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a short survey of 70 projects that received support from the Swiss Federation during their preliminary study phases. Projects are reviewed for the period between 1993 and 2001. The results obtained from the survey are presented; these are considered by the authors to be well-founded as a result of the high questionnaire return rate of 84%. The report analyses the projects as far as their degree of realisation is concerned and discusses the results. The survey also provides information on the power produced by those installations that have already been realised. For those projects that were not realised, the reasons for the negative investment decision are noted. Projects that are in the process of being implemented are discussed.

  6. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  7. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  8. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  9. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  10. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  11. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  12. Managing your engineering consultants: Steps for simultaneously improving operations, project implementation, and your bottom line

    International Nuclear Information System (INIS)

    Kirchen, E.R.; Perilloux, B.L.

    1997-01-01

    The domestic oil and gas industry has responded to depleting reserves and increasing operating costs by downsizing the overhead required to maintain production and processing facilities. For many companies this downsizing has resulted in a reduced in-house engineering staff and a greater reliance on consulting engineering services. To get the most benefit from consulting engineering companies, the partnership between consultants and the oil and gas company needs to be carefully considered. Unfortunately, these partnerships are often developed at the home office with visionary goals in mind, only to be implemented reluctantly on a local level. A better strategy is to implement partnering tools on the local level and allow these partnerships to develop naturally, and at times, uniquely, at each location. The following such tools detailed in this paper are: manpower leveraging -- using field-trained consulting engineers to address project design/implementation and field/construction support so that the operating company's engineers may focus on management and detailed development of high-return projects; enhanced project scope and design review -- developing and reviewing project scope(s) and preliminary engineering designs to minimize engineering/construction costs as well as optimize the operability and constructability of the project; and consulting rate standardization -- understanding and structuring the consultant's rates so that neither side is exploited and so that the project is staffed in the interest of project execution and not maximum profits for the consultant

  13. PROJECT IMPLEMENTATION IN ORGANISATIONS OF REPETITIVE ACTIVITIES

    Directory of Open Access Journals (Sweden)

    Marek WIRKUS

    2015-04-01

    Full Text Available The study presents the implementation of projects in organisations that achieve business objectives through the imple-mentation of repetitive actions. Projects in these organisations are, on the one hand, treated as marginal activities, while the results of these projects have significant impact on the delivery of main processes, e.g. through the introduction of new products. Human capital and solutions in this field bear impact on the success of projects in these organisations, which is not always conducive to smooth implementation of projects. Conflict results from the nature of a project, which is a one-time and temporary process, so organisational solutions are also temporary. It influences on attitudes and com-mitment of the project contractors. The paper identifies and analyses factors which affect the success of the projects.

  14. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  15. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  16. Systems engineering implementation in the preliminary design phase of the Giant Magellan Telescope

    Science.gov (United States)

    Maiten, J.; Johns, M.; Trancho, G.; Sawyer, D.; Mady, P.

    2012-09-01

    Like many telescope projects today, the 24.5-meter Giant Magellan Telescope (GMT) is truly a complex system. The primary and secondary mirrors of the GMT are segmented and actuated to support two operating modes: natural seeing and adaptive optics. GMT is a general-purpose telescope supporting multiple science instruments operated in those modes. GMT is a large, diverse collaboration and development includes geographically distributed teams. The need to implement good systems engineering processes for managing the development of systems like GMT becomes imperative. The management of the requirements flow down from the science requirements to the component level requirements is an inherently difficult task in itself. The interfaces must also be negotiated so that the interactions between subsystems and assemblies are well defined and controlled. This paper will provide an overview of the systems engineering processes and tools implemented for the GMT project during the preliminary design phase. This will include requirements management, documentation and configuration control, interface development and technical risk management. Because of the complexity of the GMT system and the distributed team, using web-accessible tools for collaboration is vital. To accomplish this GMTO has selected three tools: Cognition Cockpit, Xerox Docushare, and Solidworks Enterprise Product Data Management (EPDM). Key to this is the use of Cockpit for managing and documenting the product tree, architecture, error budget, requirements, interfaces, and risks. Additionally, drawing management is accomplished using an EPDM vault. Docushare, a documentation and configuration management tool is used to manage workflow of documents and drawings for the GMT project. These tools electronically facilitate collaboration in real time, enabling the GMT team to track, trace and report on key project metrics and design parameters.

  17. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  18. 76 FR 73616 - Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13214-002; 14274-000] Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications Accepted..., 2011, Lock 12 Hydro Partners (Lock 12), and FFP Project 107 LLC (FFP 107) filed preliminary permit...

  19. 76 FR 73614 - Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13213-002; 14271-000] Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications Accepted..., 2011, Lock 14 Hydro Partners (Lock 14), and FFP Project 106 LLC (FFP 106) filed preliminary permit...

  20. Sizing ERP implementation projects: an activity-based approach

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.

    2008-01-01

    ERP implementation projects affect large parts of an implementing organization and lead to changes in the way an organization performs its tasks. The costs needed for the effort to implement these systems are hard to estimate. Research indicates that the size of an ERP project can be a useful

  1. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  2. Analysis of Correlations between the Level of Partnering Relations and their Influence on the Time, Cost, Quality and Safety of Implementation of Construction Projects

    Directory of Open Access Journals (Sweden)

    Radziszewska-Zielina Elżbieta

    2014-11-01

    Full Text Available The present paper uses the developed model of the influence of partnering relations on the time, cost, quality and safety of implementation of construction projects. On its basis, a questionnaire has been created and a preliminary survey has been conducted. The paper presents an analysis of correlations between the level of partnering relations in the context of the partnering measures indicated in the model and their influence on the time, cost, quality and safety of implementation of construction projects. The analysis was conducted based on the data collected in 52 construction projects. The values of the Spearman rank correlation coefficient and the Pearson product-moment correlation coefficient have been calculated for the examined relations. The analysis allowed for indicating the measures of partnering whose improvement most often brings benefits with regard to the time, cost, quality and safety of implementation of construction projects. Among the 80 analysed correlations, the ones identified as strong were: 15 relations connected with the time, 8 with the cost, 5 with the quality and 1 with the safety of implementation of construction projects.

  3. Enhancing public project implementation in Botswana during the NDP 11 period

    Directory of Open Access Journals (Sweden)

    Emmanuel Botlhale

    2017-08-01

    Full Text Available Successful project implementation is critical in development planning. If there is poor project implementation, economic development will be stalled. Generally, public project implementation has a chequered history. This is particularly true in developing countries which are characterised by low levels of project management maturity. The objective of this article is to review public project implementation in Botswana and recommend improvements for the National Development Plan (NDP 11 period (2017/2018-2022/2023. The article used the survey strategy and adopted the descriptive approach. Data collection sources were mixed, that is, primary and secondary sources. It concluded that public projects are either poorly implemented (i.e. not implemented in accordance with the ‘Project Management Triple Constraint’ of cost, time and scope or not implemented at all. Given a constrained revenue envelope post 2008, there is a need for improved project implementation. Amongst others, this calls for professional public project implementation so that NDPs become a reality.

  4. 76 FR 76153 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Hydroelectric Project (Scooteney Inlet Project or project) to be located on the Potholes East Canal, which is an..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  5. Analysis and Countermeasures of PPP Project Implementation Difficulties

    Directory of Open Access Journals (Sweden)

    Xu Yifeng

    2017-01-01

    Full Text Available Since the beginning of 1995, the model of PPP project construction was introduced in China. It has been widely used in many fields such as energy, municipal, and so on. It has accumulated a lot of experience in improving the investment system structure and guiding the social capital into the infrastructure field. But the mode of PPP project construction in the implementing process in different environment often encounters a lot of problems. Based on a large amount of analysis on the existing literature, this paper resorts out the PPP project model combining the problems occurred in the implementation process of PPP project, and summarizes corresponding countermeasures aiming at the problems in order to provide help for PPP project implementation in the future.

  6. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  7. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  8. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  9. Development and implementation of a residency project advisory board.

    Science.gov (United States)

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  10. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  11. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  12. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-13

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. Scooteney Wasteway Hydroelectric Project, to be located on the P.E...

  13. Implementation of the international structure for decommissioning costing; examples and related IAEA projects - 59313

    International Nuclear Information System (INIS)

    Daniska, Vladimir; Laraia, Michele; O'Sullivan, Patrick

    2012-01-01

    In 1999, IAEA, the OECD Nuclear Energy Agency and the European Commission jointly proposed the standardised listing of decommissioning activities [1] to serve as a general basis for presentation of decommissioning costs and for promoting the harmonisation in decommissioning costing. The standardised listing of activities [1] was developed in three hierarchical levels based on analysis of typical decommissioning activities identified in various decommissioning projects. The structure [1] has been currently updated by the same organisations as the International Structure for Decommissioning Costing (ISDC) based on the experience gained over ten years of use of the original standardised listing [2]. First part of the paper presents the revised ISDC. The principle of the three-level original hierarchical structure has been preserved. Re-definition of the content and re-structuring was done to avoid ambiguity and to ensure comprehensiveness. Paper presents two basic approaches for implementation of the ISDC structure in costing - converting the cost data available in specific cost structures, mostly according the work breakdown structures of decommissioning projects into ISDC and implementation of the ISDC as the cost calculation structure. Examples of the second approach are given to show that this approach is feasible and may have several advantages. An ORACLE based costing model with implemented of the extended ISDC for detailed costing and an Excel based costing model for preliminary costing at IAEA for research reactors are given. (authors)

  14. Developing and implementing a monitoring programme: recommendations provided by the MODERN project

    International Nuclear Information System (INIS)

    Mayer, S.; Bergmans, A.; Garcia-Sineriz, J.L.; Breen, B.; Jobmann, M.

    2012-01-01

    countries and including 8 Waste Management Organizations, who joined their efforts since 2009, with the aim of developing a 'road-map to repository monitoring' by 2013. The MoDeRn project has addressed both the associated Process issues - why to monitor, how to develop a program, and how to use monitoring results - and Science and Technology issues - what to monitor, associated technical requirements and constraints, technology state-of-the-art, focused R and D and in-situ demonstrators. As the project nears its completion, some general guidance and recommendations are provided as part of a Monitoring Reference Framework to assist the development and implementation of a monitoring programme. More specifically, recommendations are provided on: - How to develop, establish and justify main motivations and objectives for monitoring; - How to develop and implement a realistic monitoring programme; and on - The relative importance different monitoring objectives may take in the decision making and governance of the disposal process. It should be noted that this reference framework explicitly acknowledges the need to place the development of a monitoring programme within its national context. Therefore, guidelines and recommendations emphasize those aspects that appear as useful to all national programmes and provide those specific recommendations that seem to be useful in a broad context. , Examples are provided by the projects three case studies carried out in crystalline (based on the Finnish/Swedish concept), sedimentary (based on the French concept) and evaporite (based on the German preliminary concept) host rocks. Furthermore, the project placed a specific attention on the societal implications of monitoring. A focused sociological study contributes to providing a better understanding of whether and how monitoring will contribute to enhancing confidence in and acceptance of the disposal process, as well as providing a basis for further, associated stakeholder engagement

  15. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  16. 5 CFR 470.313 - Project implementation regulations.

    Science.gov (United States)

    2010-01-01

    ... project must be approved by OPM and shall have full force and authority pursuant to Title VI of the Civil... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project implementation regulations. 470... PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  17. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  18. Perspectives of joint implementation projects in Lithuania

    OpenAIRE

    Štreimikienė, Dalia; Mikalauskienė, Asta

    2004-01-01

    The paper deals with the perspectives of joint implementation (JI) projects in Lithuania. The analysis of flexible mechanisms under the Kyoto protocol including Jl benefits is presented in the paper. The main aim of the article is to analyze current macroeconomic environment which has impact on the JI perspectives in Lithuania and based on this analysis to define activities, measures and institutions necessary for the implementation of these projects. A very important issue in this context is...

  19. 77 FR 7143 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-10

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. 46A Wasteway Hydroelectric Project, to be located on the P.E. 46A...

  20. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  1. FAA Loran early implementation project

    Science.gov (United States)

    1990-03-01

    The Early Implementation Project (EIP), established by FAA Administrator Admiral : Donald C. Engen, was the initial step in the process of Loran integration into the : National Airsace System (NAS). The EIP was designed to give the FAA and the Loran ...

  2. Decoupling, re-Engaging: managing trust relationships in implementation projects

    DEFF Research Database (Denmark)

    Rose, Jeremy; Schlichter, Bjarne Rerup

    2012-01-01

    , and the complex demands of managing those fluctuations. We investigate evolving trust relationships in a longitudinal case analysis of a large Integrated Hospital System implementation for the Faroe Islands. Trust relationships suffered various breakdowns, but the project was able to recover and eventually meet...... its goals. Based on concepts from Giddens’ later work on modernity, we develop two approaches for managing dynamic trust relationships in implementation projects: decoupling and re-engaging.......An important aspect of the successful implementation of large information systems (such as ERP systems) is trust. These implementations impact the legitimate interests of many groups of stakeholders, and trust is a critical factor for success. Trust in the project is contingent upon many factors...

  3. The Research of Stakeholder Power Impact on Project Implementation

    Directory of Open Access Journals (Sweden)

    Artur Biskupek

    2016-12-01

    Full Text Available Purpose of the article: The article show summarized information about stakeholders and their role in project implementation based on literature review. The second part of the article is dedicated for the research about stakeholder influence on project implementation. The only condition to participate in the survey was managing projects. Although the respondents are employed in the area of south Poland, they implement projects all over Poland. The research tool was a questionnaire which was sent by e-mail to the respondents. 90 project managers from the area of south Poland were invited to join the project, and 62 people sent back a completed questionnaire. Methodology/methods: The research was done by a questionnaire with twenty two question, which was divided into three parts. The first part was the imprint, which consisted of three questions. The second part consisted of two questions, which concerned the way of defining the word “stakeholder”. The third part concerned the topic of the research and consisted of seventeen questions. Scientific aim: The aim of the article is presenting the results of the research which was done, to show the research results of project stakeholder influence on the project implementation. Findings: The results received from the survey in the process of analysis and interpretation allow to put forward a thesis that stakeholders as a whole group are significant for the implementation of the whole project. Their impact is so important that it is possible to tell that they decide also about the project success or failure. Conclusions: The respondents show that stakeholders affect every area in large extent or very big extent. The fact has been proved in table 1 which shows the most frequently chosen answers by responders. However, by conducted analysis by the standard deviation it is possible to see a large dispersion of the results.

  4. 76 FR 75542 - Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14290-000] Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...), proposing to study the feasibility of the Porcupine Dam Hydropower Project to be located on the East Fork of...

  5. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  6. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  7. Preliminary project of s Thomson scattering system for the ETE tokamak

    International Nuclear Information System (INIS)

    Berni, Luiz Angelo

    1997-01-01

    This report presents the preliminary project of the injection and laser light block system for the Thomson (ET) scattering diagnostic to be implanted at the ETE spheric tokamak of the Instituto Nacional de Pesquisas Espaciais (INPE/LAP). Also, a scanning system for the optics of scattered light

  8. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  9. Modelled and Observed Diurnal SST Signals: "SSTDV:R.EX.-IM.A.M." Project Preliminary Results

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Høyer, Jacob; LeBorgne, Pierre

    2013-01-01

    This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase of the proj......This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase...

  10. GREENWAY IN ITALY: EXAMPLES OF PROJECTS AND IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Pasquale Dal Sasso

    2012-06-01

    Full Text Available The study analyses the greenway projects implemented in Italy, summarising their characteristics in a table that contains basic information concerning the geographical location, year of implementation, the type of layout and size, the state of implementation; the Institution that proposed the implementation, the official name, the territorial feature, the socio-economic and cultural aims, references to bibliographic and web resources and to their inclusion in plans and projects. The analysis has allowed to verify the compliance of individual contributions to the definitions attributed to the greenway from national and international associations. It has been possible to verify the use of greenways as physical support to spatial planning and the promotion of economic and productive development of rural areas.

  11. Experience of international projects implementation at Leningrad Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zavialov, L.A.

    2008-01-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  12. Experience of international projects implementation at Leningrad Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Zavialov, L.A. [Leningrad Nuclear Power Plant ' Rosenergoatom' , Leningrad Region, 188540, Sosnovy Bor (Russian Federation)

    2008-07-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  13. Dryden Flight Research Center Critical Chain Project Management Implementation

    Science.gov (United States)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  14. 77 FR 4290 - Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13089-002] Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... study the feasibility of the Conway Ranch Hydropower Project to be located on Virginia Creek, near the...

  15. Implementation of transdiagnostic treatment for emotional disorders in residential eating disorder programs: A preliminary pre-post evaluation.

    Science.gov (United States)

    Thompson-Brenner, Heather; Boswell, James F; Espel-Huynh, Hallie; Brooks, Gayle; Lowe, Michael R

    2018-03-19

    Data are lacking from empirically supported therapies implemented in residential programs for eating disorders (EDs). Common elements treatments may be well-suited to address the complex implementation and treatment challenges that characterize these settings. This study assessed the preliminary effect of implementing a common elements therapy on clinician treatment delivery and patient (N = 616) symptom outcomes in two residential ED programs. The Unified Protocol for Transdiagnostic Treatment of Emotional Disorders was adapted to address ED and co-occurring psychopathology and implemented across sites. Therapists' treatment fidelity was rated independently to assess implementation success. Additionally, longitudinal (pre-post) design compared treatment outcomes among patients treated before and after implementation. Patient outcomes included ED and depressive symptoms, experiential avoidance, anxiety sensitivity, and mindfulness. Following training and implementation, clinicians demonstrated adequate to good fidelity. Relative to pre-implementation, post-implementation patients showed significantly greater improvements in experiential avoidance, anxiety sensitivity, and mindfulness at discharge (ps ≤ .04) and more favorable outcomes on ED symptom severity, depression, and experiential avoidance at 6-month follow up (ps ≤ .0001). Preliminary pilot data support the feasibility of implementing transdiagnostic common elements therapy in residential ED treatment, and suggest that implementation may benefit transdiagnostic outcomes for patients.

  16. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13995-000] Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 4, 2011, Mill Town Power Project filed an application for a...

  17. Implementation of Multiple Intelligences Supported Project-Based Learning in EFL/ESL Classrooms

    Science.gov (United States)

    Bas, Gokhan

    2008-01-01

    This article deals with the implementation of Multiple Intelligences supported Project-Based learning in EFL/ESL Classrooms. In this study, after Multiple Intelligences supported Project-based learning was presented shortly, the implementation of this learning method into English classrooms. Implementation process of MI supported Project-based…

  18. 76 FR 75543 - Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... (FPA), proposing to study the feasibility of the Castle Creek Hydroelectric Project to be located on... be located adjacent to the original hydroelectric plant, with a single shaft Pelton turbine...

  19. Features of conflict sensitivity implementation mechanisms’ in the public sector projects

    Directory of Open Access Journals (Sweden)

    T. V. Маматоvа

    2017-08-01

    Full Text Available It has been found in the study that potential conflicts are natural for public sector projects. Among the factors, that predetermine it, one can distinguish the following: the opposite to the processes of making changes; competition of participants during the allocation of project resources; different opportunities to access the project product; insufficient consideration of interested parties’ interests; context conflicts; directing the project to resolve the conflict in the territory; unsuccessful selection of the project team. Consequently, the article deals with the issues related to the definition of the peculiarities of the «conflict sensitivity» implementation mechanisms in the public sector projects. This topic has not been studied thoroughly in the specialized publications on public administration in Ukraine. Definitions of main related categories of the «conflict sensitivity» domain based on Conflict Sensitivity Consortium guidelines have been described in the study: «conflict sensitivity», «conflict», «conflict analysis», «conflict sensitivity analysis». The main ideas on the peculiarities of conflict-sensitive project / program management implementation mechanisms in the context of ensuring the success of local development projects by the integration of «conflict sensitivity» into all three phases of the project cycle, under which the intervention is implemented, are as follows: conflict-sensitive planning; conflict-sensitive implementation; conflict-sensitive monitoring and evaluation. The example of the conflict-sensitive project management use is: EUNPACK international project «Good intentions, mixed results – A conflict sensitive understanding of the EU comprehensive approach to conflict and crisis mechanisms», which aims to develop recommendations on the improvement of the EU crises response mechanisms by the increase of their sensitivity to conflict and context. As a result, prospects for further research

  20. 75 FR 61479 - Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-10-05

    ... Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Federal Power Act, proposing to study the feasibility of the Kendall Head Tidal Energy Project, located in.... The proposed project would consist of: (1) 4 OCGen\\TM\\ hydrokinetic tidal devices each consisting of...

  1. Project W-320, waste retrieval sluicing system: BIO/SER implementation matrices

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the safety related commitments specified in HNF-SD-WM-810-001, Addendum 1 for the Waste Retrieval Sluicing System, Project W-320 and Project W-320 Safety Evaluation Report (SER), have been implemented in the project hardware, procedures and administrative controls. Four appendices include matrices which show where the 810 commitments are implemented for limiting conditions of operation and surveillance requirements controls, administrative controls, defense-in-depth controls and controls discussed in 810 Addendum 1. A fifth appendix includes the implementation of Project W-320 SER issues and provisions

  2. Data collected on TPAD implementation projects.

    Science.gov (United States)

    2014-11-01

    TPAD testing was conducted by CTR personnel at the following locations during TxDOT Project : 5-6005-01: Statewide Implementation of Total Pavement Acceptance Device (TPAD) (January : 2013 through August 2014): : (1) San Marcos Airport, : (2) IH 10 i...

  3. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  4. Hybrid Spectral Micro-CT: System Design, Implementation, and Preliminary Results

    CERN Document Server

    Bennett, James R; Xu, Qiong; Yu, Hengyong; Walsh, Michael; Butler, Anthony; Butler, Phillip; Cao, Guohua; Mohs, Aaron; Wang, Ge

    2014-01-01

    Spectral CT has proven an important development in biomedical imaging, and there have been several publications in the past years demonstrating its merits in pre-clinical and clinical applications. In 2012, Xu et al. reported that near-term implementation of spectral micro-CT could be enhanced by a hybrid architecture: a narrow-beam spectral "interior" imaging chain integrated with a traditional wide-beam "global" imaging chain. This hybrid integration coupled with compressive sensing (CS)-based interior tomography demonstrated promising results for improved contrast resolution, and decreased system cost and radiation dose. The motivation for the current study is implementation and evaluation of the hybrid architecture with a first-of-its-kind hybrid spectral micro-CT system. Preliminary results confirm improvements in both contrast and spatial resolution. This technology is shown to merit further investigation and potential application in future spectral CT scanner design.

  5. Adapting the Consolidated Framework for Implementation Research to Create Organizational Readiness and Implementation Tools for Project ECHO.

    Science.gov (United States)

    Serhal, Eva; Arena, Amanda; Sockalingam, Sanjeev; Mohri, Linda; Crawford, Allison

    2018-03-01

    The Project Extension for Community Healthcare Outcomes (ECHO) model expands primary care provider (PCP) capacity to manage complex diseases by sharing knowledge, disseminating best practices, and building a community of practice. The model has expanded rapidly, with over 140 ECHO projects currently established globally. We have used validated implementation frameworks, such as Damschroder's (2009) Consolidated Framework for Implementation Research (CFIR) and Proctor's (2011) taxonomy of implementation outcomes, combined with implementation experience to (1) create a set of questions to assess organizational readiness and suitability of the ECHO model and (2) provide those who have determined ECHO is the correct model with a checklist to support successful implementation. A set of considerations was created, which adapted and consolidated CFIR constructs to create ECHO-specific organizational readiness questions, as well as a process guide for implementation. Each consideration was mapped onto Proctor's (2011) implementation outcomes, and questions relating to the constructs were developed and reviewed for clarity. The Preimplementation list included 20 questions; most questions fall within Proctor's (2001) implementation outcome domains of "Appropriateness" and "Acceptability." The Process Checklist is a 26-item checklist to help launch an ECHO project; items map onto the constructs of Planning, Engaging, Executing, Reflecting, and Evaluating. Given that fidelity to the ECHO model is associated with robust outcomes, effective implementation is critical. These tools will enable programs to work through key considerations to implement a successful Project ECHO. Next steps will include validation with a diverse sample of ECHO projects.This is an open-access article distributed under the terms of the Creative Commons Attribution-Non Commercial-No Derivatives License 4.0 (CCBY-NC-ND), where it is permissible to download and share the work provided it is properly cited

  6. The Society for Implementation Research Collaboration Instrument Review Project: a methodology to promote rigorous evaluation.

    Science.gov (United States)

    Lewis, Cara C; Stanick, Cameo F; Martinez, Ruben G; Weiner, Bryan J; Kim, Mimi; Barwick, Melanie; Comtois, Katherine A

    2015-01-08

    Identification of psychometrically strong instruments for the field of implementation science is a high priority underscored in a recent National Institutes of Health working meeting (October 2013). Existing instrument reviews are limited in scope, methods, and findings. The Society for Implementation Research Collaboration Instrument Review Project's objectives address these limitations by identifying and applying a unique methodology to conduct a systematic and comprehensive review of quantitative instruments assessing constructs delineated in two of the field's most widely used frameworks, adopt a systematic search process (using standard search strings), and engage an international team of experts to assess the full range of psychometric criteria (reliability, construct and criterion validity). Although this work focuses on implementation of psychosocial interventions in mental health and health-care settings, the methodology and results will likely be useful across a broad spectrum of settings. This effort has culminated in a centralized online open-access repository of instruments depicting graphical head-to-head comparisons of their psychometric properties. This article describes the methodology and preliminary outcomes. The seven stages of the review, synthesis, and evaluation methodology include (1) setting the scope for the review, (2) identifying frameworks to organize and complete the review, (3) generating a search protocol for the literature review of constructs, (4) literature review of specific instruments, (5) development of an evidence-based assessment rating criteria, (6) data extraction and rating instrument quality by a task force of implementation experts to inform knowledge synthesis, and (7) the creation of a website repository. To date, this multi-faceted and collaborative search and synthesis methodology has identified over 420 instruments related to 34 constructs (total 48 including subconstructs) that are relevant to implementation

  7. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  8. 77 FR 60424 - FFP Project 73 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13484-001] FFP Project 73 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 4, 2012, FFP Project 73, LLC filed an application for a...

  9. Implementation of a Project Management Office (PMO)--experiences from year 1.

    Science.gov (United States)

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  10. 30 CFR 880.13 - Project implementation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project implementation. 880.13 Section 880.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... on Indian lands under the jurisdiction of tribes not having approved AML reclamation plans and on...

  11. Classification of Implemented Foreign Assisted Projects into ...

    African Journals Online (AJOL)

    Classification of Implemented Foreign Assisted Projects into Sustainable And. Non-sustainable ... services or benefits is the most discriminating factor. Key Words: ..... Table 2: Relative discriminatory power of the variables equation (18).

  12. Optimization education after project implementation: sharing "lessons learned" with staff.

    Science.gov (United States)

    Vaughn, Susan

    2011-01-01

    Implementations involving healthcare technology solutions focus on providing end-user education prior to the application going "live" in the organization. Benefits to postimplementation education for staff should be included when planning these projects. This author describes the traditional training provided during the implementation of a bar-coding medication project and then the optimization training 8 weeks later.

  13. Efficient and effective implementation of alternative project delivery methods.

    Science.gov (United States)

    2017-05-01

    Over the past decade, the Maryland Department of Transportation State Highway : Administration (MDOT SHA) has implemented Alternative Project Delivery (APD) methods : in a number of transportation projects. While these innovative practices have produ...

  14. Survey to promote an action implemented jointly project; Kyodo jisshi katsudo project suishin chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In the 1st (1995) conference of the nations which concluded the Framework Convention on Climate Change, decided on was a trial implementation of an action implemented jointly (AIJ) project with developing countries on the voluntary basis. In the Asia region, emission of greenhouse effect gas is remarkably increasing in accordance with rapid development of economy, and it is important to appropriately support through this project both economic development and energy demand in Asia. Taking the circumstance into consideration, the survey was conducted to contribute to activating the AIJ Japan Program. As the AIJ of leading developed countries, recognized were 25 (U.S.), 6 (Holland), 8 (Germany), 2 (Norway) projects. As to the AIJ in Southeast Asia, China and India, Indonesia is actively participating in the project, but others less actively. Concerning the project needs in every country, heightening of power plant efficiency, enhancement of efficiency in the transportation sector, new energy utilization, recovery of methane gas, etc. acquire a priority. 21 figs., 31 tabs.

  15. PERFORMANCE ANALYSIS OF PROJECTS IMPLEMENTATION IN HEIS

    Directory of Open Access Journals (Sweden)

    Sergiu-Vlad PETCU

    2015-04-01

    Full Text Available According to the European Commission, Romania is still facing significant mismatch between the skills of graduates of tertiary education and the market needs. This paper is highly relevant for the future implementation of HEIs, since they have a strong economic role and they can significantly influence long-term national social and economical development. Romania did not manage to materialize community funds allocated for the 2007-2013 programming period to its full potential. Accordingly, the proposed thesis intends to analyse how Romanian HEIs were able to manage community resources attracted by grants and how the implemented projects achieved their set objectives. According to the data collected so far, the results will show that the performance of the projects is directly dependent on the proportion of fully dedicated staff in organizational design of the project. The originality of the undertaken study is that it starts from a realistic approach, according to which the rules of the game should be adapted, depending on the players (in our case – HEIs.

  16. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  17. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    Science.gov (United States)

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  18. 33 CFR 385.13 - Projects implemented under additional program authority.

    Science.gov (United States)

    2010-07-01

    ... Implementation Report is prepared and approved in accordance with § 385.26; and (3) Not exceed a total cost of... RESTORATION PLAN CERP Implementation Processes § 385.13 Projects implemented under additional program authority. (a) To expedite implementation of the Plan, the Corps of Engineers and non-Federal sponsors may...

  19. Spent Nuclear Fuel (SNF) Project Safety Basis Implementation Strategy

    International Nuclear Information System (INIS)

    TRAWINSKI, B.J.

    2000-01-01

    The objective of the Safety Basis Implementation is to ensure that implementation of activities is accomplished in order to support readiness to move spent fuel from K West Basin. Activities may be performed directly by the Safety Basis Implementation Team or they may be performed by other organizations and tracked by the Team. This strategy will focus on five key elements, (1) Administration of Safety Basis Implementation (general items), (2) Implementing documents, (3) Implementing equipment (including verification of operability), (4) Training, (5) SNF Project Technical Requirements (STRS) database system

  20. Implementation of the model project: Ghanaian experience

    International Nuclear Information System (INIS)

    Schandorf, C.; Darko, E.O.; Yeboah, J.; Asiamah, S.D.

    2003-01-01

    Upgrading of the legal infrastructure has been the most time consuming and frustrating part of the implementation of the Model project due to the unstable system of governance and rule of law coupled with the low priority given to legislation on technical areas such as safe applications of Nuclear Science and Technology in medicine, industry, research and teaching. Dwindling Governmental financial support militated against physical and human resource infrastructure development and operational effectiveness. The trend over the last five years has been to strengthen the revenue generation base of the Radiation Protection Institute through good management practices to ensure a cost effective use of the limited available resources for a self-reliant and sustainable radiation and waste safety programme. The Ghanaian experience regarding the positive and negative aspects of the implementation of the Model Project is highlighted. (author)

  1. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  2. Preliminary project concerning the straw-fueled combined power-heat plant to be constructed at Glamsbjerg

    International Nuclear Information System (INIS)

    Gabriel, S.; Koch, T.

    1994-06-01

    Power and heat generation based on biomass gasification is of great importance due to its beneficial environmental effects and good economy. This report concerns a preliminary project on feasibility and problems of implementing a dual-purpose power plant, supplying both power and district heating to several schools, swimming pools and other public facilities at Glamsbjerg (Funen). The plant is to be based on thermal gasification (pyrolysis) of straw and use of the gas in a diesel engine. The diesels operate the power generator, and their waste heat should be utilized in the local district heating network. In order to establish a stable and flexible straw supply to the plant an evaluation of resources in the area has been carried out. Apart from straw-derived fuel the plant is planned to use natural gas for start and maintenance of the process. The prices of the combined plant and of the fuel processing are estimated in the report. (EG)

  3. Ambient Assisted Living and ageing: preliminary results of RITA project.

    Science.gov (United States)

    Aquilano, Michela; Cavallo, Filippo; Bonaccorsi, Manuele; Esposito, Raffaele; Rovini, Erika; Filippi, Massimo; Esposito, Dario; Dario, Paolo; Carrozza, Maria Chiara

    2012-01-01

    The ageing of population is a social phenomenon that most of worldwide countries are facing. They are, and will be even more in the future, indeed trying to find solutions for improving quality of life of their elderly citizens. The project RITA wants to demonstrate that an update of the current socio-medical services with an Ambient Assisted Living (AAL) approach could improve the service efficiency and the quality of life of both elderly and caregiver. This paper presents the preliminary results obtained in RITA.

  4. Project Rulison: A preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, Miles Jr [Austral Oil Company Incorporated, Houston, TX (United States); Bray, Bruce G; Mann, Robert L [CER Geonuclear Corporation, Las Vegas, NV (United States)

    1970-05-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Rulison Field in Garfield County, Colorado. Since discovery in 1952, this reservoir has been tested by nine widely-spaced conventionally completed wells. A method of stimulation, far greater in magnitude and efficiency than conventional hydraulic fracturing, is needed to recover this gas at economic rates. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90-125 billion cubic feet per 640 acres from earlier wells, was confirmed from information obtained on two conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas flow computer model. A nuclear explosive with a design yield of 40 kilotons was emplaced in a 10-3/4 inch hole at a depth of 8426 feet below ground surface and detonated on September 10, 1969. A preliminary appraisal of the data taken at shot time indicate that the explosive behaved as predicted. The explosion was completely contained underground as predicted and no major seismic damage occurred. The post-shot drilling program, to reenter the chimney, will congruence in March 1970, approximately six months after detonation. A test program will be initiated at that time to determine the degree of reservoir stimulation achieved. (author)

  5. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  6. Preliminary corrosion models for BWIP [Basalt Waste Isolation Project] canister materials

    International Nuclear Information System (INIS)

    Fish, R.L.; Anantatmula, R.P.

    1983-01-01

    Waste package development for the Basalt Waste Isolation Project (BWIP) requires the generation of materials degradation data under repository relevant conditions. These data are used to develop predictive models for the behavior of each component of waste package. The component models are exercised in performance analyses to optimize the waste package design. This document presents all repository relevant canister materials corrosion data that the BWIP and others have developed to date, describes the methodology used to develop preliminary corrosion models and provides the mathematical description of the models for both low carbon steel and Fe9Cr1Mo steel. Example environment/temperature history and model application calculations are presented to aid in understanding the models. The models are preliminary in nature and will be updated as additional corrosion data become available. 6 refs., 5 tabs

  7. Key concepts of the INCAS multicomputer project

    Energy Technology Data Exchange (ETDEWEB)

    Nehmer, J.; Haban, D.; Mattern, F.; Wybranietz, D.; Rombach, H.D.

    1987-08-01

    This paper gives an overview of the INCAS (INCremental Architecture for distributed Systems) multicomputer project, which aims at the development of a comprehensive methodology for the design and implementation of locally distributed systems. A structuring concept for distributed operating systems has been developed and integrated into the system implementation language LADY. The concurrent high-level programming language CSSA, based on the actor model, has been designed for the implementation of distributed applications. A substantial effort in the INCAS project is directed towards the development of a distributed test methodology. An experimental system has been implemented on a network of ten MC68000 microcomputers. Preliminary experience with the methodology has been gained from a small number of prototype applications.

  8. Contributions of the PMBok to the Project Management of an ERP System Implementation

    Directory of Open Access Journals (Sweden)

    Rui Manuel da Silva Gomes

    2013-12-01

    Full Text Available The implementation of Enterprise Resource Planning (ERP Systems has become generalized in companies and organizations, as a way to achieve the supply chain integration, to improve productivity and gain competitive advantages. Those implementations, more than simple technology projects, have revealed to be complex and time consuming business projects due to the structural and behaviour changes involved. This article analyzes, through the Project Coordinator’s point of view, two real cases of ERP implementation projects at Ibico Portuguesa, comparing the project management methodology adopted by Ibico with the Project Management Body of Knowledge (PMBoK, coming to the conclusion that the use of the PMBoK norms and best practices by the Project Manager could have been a success factor in those implementations, particularly referring to the elements that have been pointed as the most critical: planning, involvement and commitment of top management as well as stakeholders’ management.DOI:10.5585/gep.v4i2.37

  9. Results of nine Connecticut Cancer Partnership implementation projects.

    Science.gov (United States)

    Morra, Marion E; Mowad, Linda Z; Hogarty, Lucinda Hill; Kettering, Shiu-Yu

    2012-01-01

    The Connecticut Cancer Partnership (Partnership), through funds from the Connecticut legislature, the AttorneyGeneral Fund and some limited federal funding, has spearheaded the implementation of a series of projects by Connecticut institutions and State of Connecticut departments. Among them are projects in prevention, detection, treatment, survivorship and end-of-life care, along with programs that target ethnic and uninsured populations. This article highlights funding sources, procedures for choosing projects and summaries for nine completed projects of interest to practicing physicians. It also includes a listing of additional projects currently underway. The use of shared funding among the State's partners highlights the energy of the Partnership in carrying out the common vision embodied in the Connecticut Cancer Plan.

  10. Causes of project implementation delay in the Ethiopian Electric ...

    African Journals Online (AJOL)

    This study identifies the major sources of delay in the implementation of construction projects in the Ethiopian electric utility enterprise. It also investigates the magnitude of schedule variance and cost overrun experienced by the Universal Electric Access Program (UEAP)due to implementation delay. Primary data were ...

  11. IMPLEMENTING SMALL AND MEDIUM IT PROJECTS IN SMALL AND MEDIUM ENERPRISES

    Directory of Open Access Journals (Sweden)

    Felix DUMITRESCU

    2014-06-01

    Full Text Available Information technology is essential nowadays for all companies. Small enterprises are an important part of the economy and this article aims at providing some useful insight in implementing modern IT projects to their benefit. Due to the limited funding available for the IT infrastructure in most start-ups and small businesses, the projects should be adapted to fulfill the needs of the company for the lowest cost. The paper will start by defining small and medium project management theory and outlining the target of the study, small and medium sized companies. Next it will show a number of case studies of IT projects implemented in different types of small companies in Romania. Based on these implementations the article will draw some conclusions relevant to most small companies which need to design or improve their IT infrastructure.

  12. Preliminary design report: Prototypical Spent Fuel Consolidation Equipment Demonstration Project: Phase 1

    International Nuclear Information System (INIS)

    Blissell, W.H.; Ciez, A.P.; Mitchell, J.L.; Winkler, C.J.

    1986-12-01

    This document describes the Westinghouse Preliminary Design for the Prototypical Consolidation Demonstration Project per Department of Energy (DOE) Contract No. DE-AC07-86ID12649 and under direction of the DOE Idaho Operations Office. The preliminary design is the first step to providing the Department of Energy with a fully qualified, licensable, cost-effective spent fuel rod consolidation system. The design was developed using proven technologies and equipment to create an innovative approach to previous rod consolidation concepts. These innovations will better enable the Westinghouse system to: consolidate fuel rods in a precise, fully-controlled, accountable manner; package all rods from two PWR fuel assemblies or from four BWR fuel assemblies in one 8.5 inch square consolidated rods canister; meet all functional requirements; operate with all fuel types common to the US commercial nuclear industry with minimal tooling changeouts; and meet consolidation production process rates, while maintaining operator and public health and safety. This Preliminary Design Report provides both detailed descriptions of the equipment required to perform the rod consolidation process and the supporting analyses to validate the design

  13. Toward an effective implementation of clean development mechanism projects in China

    International Nuclear Information System (INIS)

    Zhang Zhongxiang

    2006-01-01

    With the already huge and growing amount of greenhouse gas emissions and a great deal of low-cost abatement options available, China is widely expected as the world's number one host country of clean development mechanism (CDM) projects. But, making this potential a reality represents a significant challenge for China, because there has been a general lack of awareness by both the Chinese government and business communities, clear institutional structure, and implementation strategy. This has raised great concern about China's ability to compete internationally for CDM projects and exploit fully its CDM potential. This paper aims to address how CDM projects will be effectively implemented in China by examining the major CDM capacity building projects in China with bilateral and multilateral donors, the treatment of low-cost, non-priority CDM projects, and how a system for application, approval, and implementation of CDM projects is set up in China and what roles the main institutional actors are going to play in the system. We conclude that these capacity building assistances, the establishment of streamlined and transparent CDM procedures and sound governance, and the lessons learned and experience gained from the implementation of the CDM project in Inner Mongolia and the two Prototype Carbon Fund' projects will help China to take advantage of CDM opportunities. Moreover, in order to further capitalize on its CDM potential, there is a pressing need for the Chinese government to amend its current interim CDM regulations, in particular those controversial provisions on the eligibility to participate in CDM projects in China and the distribution of the revenues derived from CDM project between the project developer and the Chinese government. We believe that taking these capacity building projects and the recommended actions to clearly define the sustainable development objective of the CDM and disseminate CDM knowledge to local authorities and project developers as

  14. Research in advanced formal theorem-proving techniques. [design and implementation of computer languages

    Science.gov (United States)

    Raphael, B.; Fikes, R.; Waldinger, R.

    1973-01-01

    The results are summarised of a project aimed at the design and implementation of computer languages to aid in expressing problem solving procedures in several areas of artificial intelligence including automatic programming, theorem proving, and robot planning. The principal results of the project were the design and implementation of two complete systems, QA4 and QLISP, and their preliminary experimental use. The various applications of both QA4 and QLISP are given.

  15. Revisiting EOR Projects in Indonesia through Integrated Study: EOR Screening, Predictive Model, and Optimisation

    KAUST Repository

    Hartono, A. D.; Hakiki, Farizal; Syihab, Z.; Ambia, F.; Yasutra, A.; Sutopo, S.; Efendi, M.; Sitompul, V.; Primasari, I.; Apriandi, R.

    2017-01-01

    EOR preliminary analysis is pivotal to be performed at early stage of assessment in order to elucidate EOR feasibility. This study proposes an in-depth analysis toolkit for EOR preliminary evaluation. The toolkit incorporates EOR screening, predictive, economic, risk analysis and optimisation modules. The screening module introduces algorithms which assimilates statistical and engineering notions into consideration. The United States Department of Energy (U.S. DOE) predictive models were implemented in the predictive module. The economic module is available to assess project attractiveness, while Monte Carlo Simulation is applied to quantify risk and uncertainty of the evaluated project. Optimization scenario of EOR practice can be evaluated using the optimisation module, in which stochastic methods of Genetic Algorithms (GA), Particle Swarm Optimization (PSO) and Evolutionary Strategy (ES) were applied in the algorithms. The modules were combined into an integrated package of EOR preliminary assessment. Finally, we utilised the toolkit to evaluate several Indonesian oil fields for EOR evaluation (past projects) and feasibility (future projects). The attempt was able to update the previous consideration regarding EOR attractiveness and open new opportunity for EOR implementation in Indonesia.

  16. Revisiting EOR Projects in Indonesia through Integrated Study: EOR Screening, Predictive Model, and Optimisation

    KAUST Repository

    Hartono, A. D.

    2017-10-17

    EOR preliminary analysis is pivotal to be performed at early stage of assessment in order to elucidate EOR feasibility. This study proposes an in-depth analysis toolkit for EOR preliminary evaluation. The toolkit incorporates EOR screening, predictive, economic, risk analysis and optimisation modules. The screening module introduces algorithms which assimilates statistical and engineering notions into consideration. The United States Department of Energy (U.S. DOE) predictive models were implemented in the predictive module. The economic module is available to assess project attractiveness, while Monte Carlo Simulation is applied to quantify risk and uncertainty of the evaluated project. Optimization scenario of EOR practice can be evaluated using the optimisation module, in which stochastic methods of Genetic Algorithms (GA), Particle Swarm Optimization (PSO) and Evolutionary Strategy (ES) were applied in the algorithms. The modules were combined into an integrated package of EOR preliminary assessment. Finally, we utilised the toolkit to evaluate several Indonesian oil fields for EOR evaluation (past projects) and feasibility (future projects). The attempt was able to update the previous consideration regarding EOR attractiveness and open new opportunity for EOR implementation in Indonesia.

  17. Impact of project funding on the implementation of LEEMP ...

    African Journals Online (AJOL)

    The implementation process could make a project succeed, fail or even abandoned midstream. Information gathered from LEEMP in Imo State indicates that out of the 258 development projects embarked upon by LEEMP, only 24.4% have been completed while 75.6% are at their various completion stages after committing ...

  18. Systemwide Implementation of Project-Based Learning: The Philadelphia Approach

    Science.gov (United States)

    Schwalm, Jason; Tylek, Karen Smuck

    2012-01-01

    Citywide implementation of project-based learning highlights the benefits--and the challenges--of promoting exemplary practices across an entire out-of-school time (OST) network. In summer 2009, the City of Philadelphia and its intermediary, the Public Health Management Corporation (PHMC), introduced project-based learning to a network of more…

  19. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  20. Suggestions and comments about preliminary plans of ABNT 20:04.002-001 standard 'Seismic actions for nuclear facilities project'

    International Nuclear Information System (INIS)

    Soares, W.A.

    1984-01-01

    This paper presents an analysis of preliminary plans of standard 'seismic actions for nuclear facilities project'. This document presents since seismic event characterization up to details of structural project of nuclear facilities construction. (C.M.)

  1. ERP project implementation and risk management of nuclear power enterprise

    International Nuclear Information System (INIS)

    Wang Fei

    2008-01-01

    According to the characteristic and development trend of nuclear power enterprise informatization, combined with the general ERP implementation experience, the method is proposed to ensure the successful implementation and risk management of ERP project in nuclear power enterprise. (authors)

  2. Implementation of a project-based engineering school: increasing student motivation and relevant learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-11-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the contents and competencies of several courses. This paper presents the academic context under which this experience has been implemented, and a summary of the work done to design and implement the Project-Based Engineering School at the UEM. The steps followed, the structure used, some sample projects, as well as the difficulties and benefits of implementing the programme are discussed in this paper. The results are encouraging as students are more motivated and the initial set objectives were accomplished.

  3. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    International Nuclear Information System (INIS)

    Fenham, J.

    2003-01-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO 2 , CH 4 , N 2 O, HFCs, PFCs and SF 6 . The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF 6 -emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from solvent use and other sources is included

  4. 4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review

    NARCIS (Netherlands)

    de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else

    2016-01-01

    We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics

  5. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    Science.gov (United States)

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  6. Analysis of renewable energy projects' implementation in Russia

    Science.gov (United States)

    Ratner, S. V.; Nizhegorodtsev, R. M.

    2017-06-01

    With the enactment in 2013 of a renewable energy scheme by contracting qualified power generation facilities working on renewable energy sources (RES), the process of construction and connection of such facilities to the Federal Grid Company has intensified in Russia. In 2013-2015, 93 projects of solar, wind, and small hydropower energy were selected on the basis of competitive bidding in the country with the purpose of subsequent support. Despite some technical and organizational problems and a time delay of some RES projects, in 2014-2015 five solar generating facilities with total capacity of 50 MW were commissioned, including 30 MW in Orenburg oblast. However, the proportion of successful projects is low and amounts to approximately 30% of the total number of announced projects. The purpose of this paper is to analyze the experience of implementation of renewable energy projects that passed through a competitive selection and gained the right to get a partial compensation for the construction and commissioning costs of RES generating facilities in the electric power wholesale market zone. The informational background for the study is corporate reports of project promoters, analytical and information materials of the Association NP Market Council, and legal documents for the development of renewable energy. The methodological base of the study is a theory of learning curves that assumes that cost savings in the production of high-tech products depends on the production growth rate (economy of scale) and gaining manufacturing experience (learning by doing). The study has identified factors that have a positive and a negative impact on the implementation of RES projects. Improvement of promotion measures in the renewable energy development in Russia corresponding to the current socio-economic situation is proposed.

  7. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  8. Notification: Implementation of Executive Order 13771, “Reducing Regulation and Controlling Regulatory Costs”

    Science.gov (United States)

    Project #OA&E-FY18-0177, April 10, 2018. The OIG plans to begin preliminary research on the Office of the Administrator's Office of Policy implementation of Executive Order 13771, Reducing Regulation and Controlling Regulatory Costs.

  9. Current status of RCA projects and strategies for future implementation

    International Nuclear Information System (INIS)

    Kim, Kyoung Pyo; Lee, Jeong Kong

    1998-12-01

    This report is intended to provide basic overall information about ways to promote technical cooperation within the framework of RCA to accelerate and coordinate cooperative activities in nuclear science and technology in Asia and the Pacific region through a thorough review on the current status and through suggesting future implementation strategies. The contents of this report include an overall introduction of RCA, guidelines and operating rules for RCA programmes, current status and future plans for RCA projects as well as the RCA vision for the next 25 years. By reviewing the current status and future implementation strategies for RCA projects, it will help to set up a national nuclear policy aimed at seeking maximum benefits from participation in RCA projects and to implement programmes for nuclear cooperation with Asian-Pacific countries. It is expected that as a lead country for the energy sector, which is one of five thematic areas for the year 1999 - 2000 cycle programmes, Korea will continue to make significant contributions towards the implementation of RCA programmes in the future. With this report, we plan to keep up with future developments as well as implement an effective cooperation with the countries in the region so that the opinion of Korea, one of the nuclear advanced countries in the region, can be fully reflected in the establishment of future plans for RCA programmes. (author). 3 refs., 5 tabs., 1 fig

  10. Impact evaluation of productive use—An implementation guideline for electrification projects

    International Nuclear Information System (INIS)

    Bensch, Gunther; Peters, Jörg; Schmidt, Christoph M.

    2012-01-01

    There is a consensus in the international community that rural electrification and, in particular, the productive use of electricity contributes to poverty alleviation. At the same time, efforts to evaluate the impacts of development projects have increased substantially. This paper provides a hands-on guide for designing evaluation studies regarding the impacts of productive electricity usage. Complementary to the existing literature on evaluation methods, this guide familiarizes project managers with the concrete steps that have to be undertaken to plan and implement an evaluation. The guide comprises three modules based on enterprise surveys and on anecdotal case studies. For each module, the implementation is described on a step-by-step basis including conceptual issues as well as logistics and methodological questions. - Highlights: ► Hands-on evaluation guideline for development project managers. ► Step-by-step procedure on how to implement evaluation. ► Impacts of productive electricity use.

  11. Challenges in Implementing FP7 Projects in the Public Institutions

    Directory of Open Access Journals (Sweden)

    Viorel VULTURESCU

    2012-06-01

    Full Text Available National Authority for Scientific Research (ANCS and Executive Unit for Higher Education, Research and Development and Innovation Funding (UEFISCDI participate to several projects funded under the Framework Programmes, since 1998. The staff from each the two organisations participating in projects are merely the same, typically from “international cooperation” departments. In each of the two organisations, dedicated teams were set and a distinct specialization emerged. In this respect, dedicated procedures and good practices in project management were developed. Even the Framework Programs had different structures and the focused was different (e.g. knowledge creation, EU problem solving, scientific support for policies and programs, etc., the funding instruments (projects were not radically different from a Framework Program to another, so the staff could gain experience in managing this type of projects. Experience and expertise gained during this long period of time led to definition of a general framework within the two institutions and setting up of a general guideline for participation to this type of projects. The main dimensions of this framework are: project team organization, project management process, managing results and risk, organisational framework, good practices, factors which ensure success in project implementation.The paper presents a specific framework for FP 7 project implementation and how this framework is applied by both organisations, a set of rules and procedures that should be followed by any organisation, in particular governmental ones, participating in FP 7 projects and a set of good practices developed by ANCS and UEFISCDI.

  12. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  13. Implementation of municipal health promoting projects in primary schools: teachers perspective

    DEFF Research Database (Denmark)

    Nordin, Lone Lindegard

    2013-01-01

    . The project is funded by the Danish Ministry of Science, University of Aarhus and Silkeborg municipality, and involves 5 primary schools, 23 teachers and 233 pupils from 7th to 9 class. The project is positioned within the critical approach to school health education and health promotion, developed......Implementation of municipally health promoting projects' in primary schools: teachers perspective Research question This paper discusses the findings from a qualitative research, that aimed to investigate how teachers in primary schools implemented municipal health promoting projects focusing...... that there is a “gap” between policy and practice according to aim, content and methods, and that teachers practice can be explained as coping mechanism. The key findings include: • Teachers practice is closer to traditional health education than critical health education. • Teachers priorities the mandatory teaching...

  14. Preliminary results on the cryogenic target for FIREX project

    International Nuclear Information System (INIS)

    Iwamoto, A.; Maekawa, R.; Mito, T.; Okamoto, M.; Motojima, O.; Nakai, M.; Norimatsu, T.; Nagai, K.

    2006-01-01

    Preliminary tests on the cryogenic target for the fast ignition realization experiment (FIREX) project has been conducted. A foam shell method is proposed to realize its target design. A foam target consists of three parts: a foam shell, a conical laser guide and a liquid or gas feeder made of glass. The shell is a hollow sphere (500 μm in diameter) with a uniform and thin foam layer (about 20 μm in thickness). Epoxy resin is utilized to assemble the parts into the target. Liquid fuel is fed into the shell by the feeder and is soaked up by the foam material through capillarity. The fuel is then solidified. Regarding target fabrication, one of the concerns is the influence on various thermal contractions from the different materials when it is cooled down to cryogenic environment. This paper describes the result on the validity check at cryogenic environment and the demonstration of H 2 liquefaction using a dummy target instead of the foam target. Judging from these results, the target assembled in the same process as the dummy target is sure to be practicable for the FIREX project. (authors)

  15. Implementing an interprofessional first-year teamwork project: some key reflections.

    Science.gov (United States)

    McNaughton, Susan Maree

    2013-09-01

    Implementing an interprofessional teamwork project for first-year students presents pedagogical and practical challenges. While transferable skills and attributes are important, engagement of students with limited professional experience in teamwork depends on relevance to current learning needs. This report outlines principles learned from planning and implementing a teamwork project for an interprofessional health administration and service development course. Practising interprofessional teamwork as leaders and teachers, aligning with previous, current and future teamwork content and processes and responding to student feedback and achievement have been the key factors in shaping the project over three semesters. Face-to-face and online interprofessional teamwork learning has necessitated developing resources that support self-direction, using familiar technology and providing enabling physical environments. Implications for first-year interprofessional teamwork are that structured well-resourced processes, responsiveness and alignment of learning all improve student outcomes.

  16. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  17. An empirical identification and categorisation of training best practices for ERP implementation projects

    Science.gov (United States)

    Esteves, Jose Manuel

    2014-11-01

    Although training is one of the most cited critical success factors in Enterprise Resource Planning (ERP) systems implementations, few empirical studies have attempted to examine the characteristics of management of the training process within ERP implementation projects. Based on the data gathered from a sample of 158 respondents across four stakeholder groups involved in ERP implementation projects, and using a mixed method design, we have assembled a derived set of training best practices. Results suggest that the categorised list of ERP training best practices can be used to better understand training activities in ERP implementation projects. Furthermore, the results reveal that the company size and location have an impact on the relevance of training best practices. This empirical study also highlights the need to investigate the role of informal workplace trainers in ERP training activities.

  18. A preliminary social and economic assessment of the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Cluett, C.; Bolton, P.; York, K.; Wood, M.; Radford, L.

    1981-07-01

    This report provides a preliminary assessment of the social and economic impacts that could be caused by the construction and operation of a nuclear waste repository on the Hanford Site near Richland, Washington. This assessment involved assembling a comprehensive data base for the local Tri-Cities impact area and the surrounding region, establishing a network of local and regional contacts, making preliminary judgments about potential social impacts caused by the proposed repository, and recommending further research. This report concludes that growth effects under the anticipated work force scenario are expected to be relatively minor. With a strong public involvement program on the part of the project developers, including an ongoing dialogue with local and regional planners, potential socio-economic impacts can be anticipated and managed effectively. Specific recommendations are made for filling gaps in the available data, exploring key issues in more detail, and improving the analysis of social impacts. The report was prepared by the Battelle-Human Affairs Research Center in 1980 and 1981

  19. Napa River Sediment TMDL Implementation and Habitat Enhancement Project

    Science.gov (United States)

    Information about the SFBWQP Napa River Sediment TMDL Implementation and Habitat Enhancement Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  20. Key Success Factors of Renewable Energy Projects Implementation in Rural Areas of Indonesia

    Directory of Open Access Journals (Sweden)

    Wati Hermawati

    2017-12-01

    Full Text Available This paper is an exploratory study on renewable energy implementation in the rural areas of Indonesia. The study aim was to investigate the factors contributing to the sustainability of renewable energy projects in the rural areas. It mostly uses a qualitative approach. Primary data was mainly obtained from in-depth interviews conducted in site areas with the project owners, project managers, a key person in each local government, industry representatives, and the local community, including local leaders and users of renewable energy. Secondary data in the form of various official project reports was also used. The results indicated that the success of energy project implementation lay not only in good technology performance and long-term maintenance, but was also highly dependent on six key factors, namely: (1 project planning and development; (2 community participation; (3 active communication and beneficiaries; (4 availability of maintenance program, workshop and technician; (5 project management and institutionalization; (6 local government support and networks. The findings from this study provide useful insights to all stakeholders involved in the implementation of renewable energy technology for the rural areas in Indonesia.

  1. A financing model to solve financial barriers for implementing green building projects.

    Science.gov (United States)

    Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.

  2. Drinking-water hydropower installation at Schattdorf - Preliminary project; Trinkwasserkraftwerk Oberfeld Haldi bei Schattdorf. Programm Kleinwasserkraftwerke. Vorprojekt 2009

    Energy Technology Data Exchange (ETDEWEB)

    Gasser, M.

    2009-09-15

    This preliminary project report for the Swiss Federal Office of Energy (SFOE) describes the project for the construction of a small hydropower installation near Schattdorf, Switzerland. The location of the Faetsch springs and the ownership of the various land parcels involved are described. The general water supply project for Oberfeld-Haldi and the various springs and reservoirs involved are also discussed. The works necessary for the realisation of the hydropower project are described and discussed. Cost estimates are presented and the application for cost-covering remuneration of the scheme is noted. Estimates of energy production are presented and discussed, as is the economic viability of the project. Environmental aspects of the project are also discussed.

  3. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    Science.gov (United States)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  4. New construction of the Kelchbach hydropower installation - Preliminary project; Vorprojekt Neubau Kraftwerk Kelchbach. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Kalbermatten, J.

    2009-09-15

    This final report for the Swiss Federal Office of Energy (SFOE) describes the preliminary project for the new construction of a small hydropower installation on the Kelchbach stream in Naters, Switzerland. After a pressure-pipe rupture, the old, over 100 year-old installation was closed down. The replacement installation is planned to increase power production. The works necessary for the realisation of this hydropower project are described and discussed. Several older studies on the replacement of the installation are listed. Three variants are presented and discussed as are hydrological data on the project. Cost estimates are presented and discussed. Estimates of energy production are also presented and discussed, as is the economic viability of the project. Environmental aspects of the project are also examined.

  5. Implementing care programmes for frail older people: A project management perspective

    NARCIS (Netherlands)

    Bindels, J.; Cox, K.; Abma, T.A.; van Schayck, O.C.P.; Widdershoven, G.

    2015-01-01

    Objective: To examine the issues that influenced the implementation of programmes designed to identify and support frail older people in the community in the Netherlands. Methods: Qualitative research methods were used to investigate the perspectives of project leaders, project members and members

  6. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Science.gov (United States)

    Romeli, Norsyakilah; Muhamad Halil, Faridah; Ismail, Faridah; Sufian Hasim, Muhammad

    2018-03-01

    As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  7. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Directory of Open Access Journals (Sweden)

    Romeli Norsyakilah

    2018-01-01

    Full Text Available As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  8. Lessons from implementation of ecohealth projects in Southern Africa: A principal investigator's perspective.

    Science.gov (United States)

    Chimbari, Moses John

    2017-11-01

    Ecohealth projects are designed to garner ownership among all stakeholders, such as researchers, communities, local leadership and policy makers. Ideally, designs should ensure that implementation goes smoothly and that findings from studies benefit the stakeholders, particularly bringing changes to the communities researched. Paradoxically, the process is fraught with challenges associated with implementation. Notwithstanding these challenges, evidence from projects implemented in southern Africa justify the need to invest in the subject of ecohealth. This paper describes and discusses a principal investigator's experience of leading ecohealth projects in Zimbabwe between 2002 and 2005, in Botswana between 2010 and 2014 and in South Africa (ongoing). The discourse is centred on issues of project management and leadership, transdisciplinarity, students' involvement, data management, community engagement, dissemination of research findings and the role of institutions in project management and implementation. The paper concludes that the ecohealth approach is valuable and should be encouraged making the following recommendations; 1) principal investigators must have a good understanding of socio-ecological systems, have excellent project management and writing skills, 2) more than one PI should be involved in the day-to-day running of the project in order to avoid disruption of project activities in the event that the PI leaves the project before it ends, 3) researchers should be trained in ecohealth principles and methodologies at the time of building the research teams, 4) full proposals should be developed with active participation of communities and stakeholders in order to develop a shared vision, 5) involvement of postdoctoral fellows and dedicated researchers with postgraduate students should be encouraged to avoid situations where some objectives are not fully addressed because of the narrow nature of students' work; and 6) citizen science should be

  9. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  10. Examining implementation and preliminary performance indicators of veterans treatment courts: The Kentucky experience.

    Science.gov (United States)

    Shannon, Lisa M; Birdwhistell, Shira; Hulbig, Shelia K; Jones, Afton Jackson; Newell, Jennifer; Payne, Connie

    2017-08-01

    Veterans' Treatment Courts (VTCs) are posited as a solution to offer rehabilitation for veterans involved in the criminal justice system. Despite the pervasive implementation of VTCs, there is little research focused specifically on VTC implementation and outcomes, which are based on other problem-solving court models such as drug court. The current study presents qualitative process evaluation data from key stakeholders (n=21) and veteran participants (n=4) to show accomplishments, challenges, and lessons learned during first-year implementation at two VTC sites. Quantitative performance data is also presented on veteran participants (n=19) served during the first year to show: types of services, monitoring, judicial interaction, sanctions/therapeutic responses, and rewards, as well as preliminary data on recidivism. Qualitative data, from both key stakeholders and veteran participants, suggests that offering rehabilitation via various program components, services/referrals, and accountability are critical to the success of the VTC. Data also provides valuable lessons learned for VTC implementation including communication, collaboration, information/protocols, and resources. Performance data shows that a variety of services are utilized and that frequent judicial interaction, drug testing, and sanctions are cornerstones of the VTC. Implications and future directions for research are discussed. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. EUBerry: Competitiveness and marketing strategies of sustainable berries validated for improved health benefits - Introduction to the project and preliminary results

    NARCIS (Netherlands)

    Groot, M.J.; Roelofs, P.F.M.M.; Kaim, E.; Sijtsema, S.J.; Zimmermann, K.L.; Zmarlicki, K.

    2014-01-01

    The EUBerry project is not only building on technical research but also studies berry production and consumption from a social sciences perspective. This paper aims to describe the approach used in the EUBerry project about business economics as well as marketing. In addition some preliminary

  12. MANAGEMENT OF A COMPANY’S ECONOMIC SUSTAINABILITY IN THE PROCESS OF INNOVATIVE PROJECTS IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Juliana M. Sulejmanova

    2013-01-01

    Full Text Available The article is devoted to management of a company’s sustainability in the process of innovative projects implementation. The author suggests using dynamic index named aggregated index of a company’s economic stability. Criteria of choosing innovative projects to be implemented are worked out. These criteria add traditional estimation and take into account changing company’s economic stability at every stage of project lifecycle.

  13. REGULATORY FUNDAMENTALS FOR IMPLEMENTATION OF INFORMATION TECHNOLOGY PROJECTS IN INDUSTRY

    Directory of Open Access Journals (Sweden)

    L. V. Gubich

    2016-01-01

    Full Text Available The article provides an overview of the existing regulatory basis for the development of IIST. The features of IT projects management and a brief description of methodological recommendations on implementation of IT projects of the State scientific and technical Program «Electronic enterprise resource planning (CALS-ERP-technology» for 2011–2015 are considered.

  14. Physicians' accounts of frontline tensions when implementing pilot projects to improve primary care.

    Science.gov (United States)

    Mansfield, Elizabeth; Bhattacharyya, Onil; Christian, Jennifer; Naglie, Gary; Steriopoulos, Vicky; Webster, Fiona

    2018-03-19

    Purpose Canada's primary care system has been described as "a culture of pilot projects" with little evidence of converting successful initiatives into funded, permanent programs or sharing project outcomes and insights across jurisdictions. Health services pilot projects are advocated as an effective strategy for identifying promising models of care and building integrated care partnerships in local settings. In the qualitative study reported here, the purpose of this paper is to investigate the strengths and challenges of this approach. Design/methodology/approach Semi-structured interviews were conducted with 34 primary care physicians who discussed their experiences as pilot project leads. Following thematic analysis methods, broad system issues were captured as well as individual project information. Findings While participants often portrayed themselves as advocates for vulnerable patients, mobilizing healthcare organizations and providers to support new models of care was discussed as challenging. Competition between local healthcare providers and initiatives could impact pilot project success. Participants also reported tensions between their clinical, project management and research roles with additional time demands and skill requirements interfering with the work of implementing and evaluating service innovations. Originality/value Study findings highlight the complexity of pilot project implementation, which encompasses physician commitment to addressing care for vulnerable populations through to the need for additional skill set requirements and the impact of local project environments. The current pilot project approach could be strengthened by including more multidisciplinary collaboration and providing infrastructure supports to enhance the design, implementation and evaluation of health services improvement initiatives.

  15. Preliminary Analysis of the (Process and Product) Quality of Physical Education in Flemish Secondary Schools: Implementation of IKLO

    Science.gov (United States)

    Huts, K.; Van Hoecke, J.; De Knop, P.; Theeboom, M.

    2009-01-01

    The purpose of the present study was twofold, namely implementing a multifunctional (self-) evaluation instrument for physical education in a sample of Flemish secondary schools (N=100), while simultaneously obtaining a preliminary picture of the subjects' product and process quality. Descriptive statistics revealed that P. E. teachers' engagement…

  16. From innovation to implementation - SME collaboration in student projects

    DEFF Research Database (Denmark)

    Bridgwood, Ian

    The Center for Bachelor of Engineering Studies at the Technical University of Denmark (DTU Diplom) [1] provides B.Eng. programs with the Conceive Design Implement and Operate framework [2] as a central element. Courses are designed to be a source of innovation, particularly in relation to small a...... and medium sized enterprises (SME) in the region. The project based courses teach students to undertake the analysis, design and implementation of systems which are relevant to and in cooperation with SMEs....

  17. Development and implementation of the Qatargas project

    International Nuclear Information System (INIS)

    Abdulrahman, A.

    1997-01-01

    Qatar Liquefied Gas Company Ltd. (QATAR GAS) was established in 1984 by an Emiri decree to build, own and operate a 6 million tonne per annum, LNG plant in Qatar using North Field gas as feedstock, and to export the products. At the time, the joint venture partners with Qatar Petroleum Corporation were TOTAL and British Petroleum (BP). QATAR GAS is responsible for the implementation and operation of the upstream project.(Author). 2 figs

  18. Development and implementation of the Qatargas project

    Energy Technology Data Exchange (ETDEWEB)

    Abdulrahman, A [Qatar Liquefied Gas Company Ltd., Doha (Qatar)

    1997-06-01

    Qatar Liquefied Gas Company Ltd. (QATAR GAS) was established in 1984 by an Emiri decree to build, own and operate a 6 million tonne per annum, LNG plant in Qatar using North Field gas as feedstock, and to export the products. At the time, the joint venture partners with Qatar Petroleum Corporation were TOTAL and British Petroleum (BP). QATAR GAS is responsible for the implementation and operation of the upstream project.(Author). 2 figs.

  19. Watershed manipulation project: Field implementation plan for 1990-1992

    International Nuclear Information System (INIS)

    Erickson, H.; Narahara, A.M.; Rustad, L.E.; Mitchell, M.; Lee, J.

    1993-02-01

    The Bear Brook Watershed in Maine (BBWM) was established in 1986 at Lead Mountain, Maine as part of the Environmental Protection Agency's (EPA) Watershed Manipulation Project (WPM). The goals of the project are to: (1) assess the chemical response of a small upland forested watershed to increased loadings of SO4, (2) determine interactions among biogeochemical mechanisms controlling watershed response to acidic deposition, and (3) test the assumptions of the Direct/Delayed Response Programs (DDRP) computer models of watershed acidification. The document summarizes the field procedures used in the establishment and initial implementation of the plot- and catchment- scale activities at the BBWM, and outlines plans for 1990-02 project activities

  20. A Financing Model to Solve Financial Barriers for Implementing Green Building Projects

    Science.gov (United States)

    Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379

  1. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    Energy Technology Data Exchange (ETDEWEB)

    Fenham, J. [Risoe National Lab., Roskilde (Denmark)

    2003-07-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6}. The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF{sub 6}-emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from

  2. The Conception of the Information Management of Innovation Project and the Stages of its Implementation

    Directory of Open Access Journals (Sweden)

    Babinska Solomiia Ya.

    2017-01-01

    Full Text Available The informational support plays an important role in the development and implementation of innovative projects, is a prerequisite for development of its conception. Proceeding from this, the article considers approaches of scientists to components of the life cycle of innovation project, revealing that the most of them would allocate three phases (development, implementation, and completion. In terms of the information support for each of these stages were defined objectives, tasks, managerial decisions (selecting of an innovation object; choosing the economy sector; identifying sources of financing; costing; substantiating expediency as to implementing a project; choosing counter-parties; product pricing; selecting markets; further use of the property objects, information arrays, necessary sources of information, it was considered how the conception of information management of innovation project is being implemented in stages.

  3. Site 300 hazardous-waste-assessment project. Interim report: December 1981. Preliminary site reconnaissance and project work plan

    International Nuclear Information System (INIS)

    Raber, E.; Helm, D.; Carpenter, D.; Peifer, D.; Sweeney, J.

    1982-01-01

    This document was prepared to outline the scope and objectives of the Hazardous Waste Assessment Project (HWAP) at Site 300. This project was initiated in October, 1981, to investigate the existing solid waste landfills in an effort to satisfy regulatory guidelines and assess the potential for ground-water contamination. This involves a site-specific investigation (utilizing geology, hydrology, geophysics and geochemistry) with the goal of developing an effective ground-water quality monitoring network. Initial site reconnaissance work has begun and we report the results, to date, of our geologic hydrogeologic studies. All known solid waste disposal locations are underlain by rocks of either the Late Miocene Neroly Formation or the Cierbo Formation, both of which are dominantly sandstones interbedded with shale and claystone. The existence of a regional confined (artesian) aquifer, as well as a regional water-table aquifer is postulated for Site 300. Preliminary analysis has led to an understanding of directions and depths of regional ground-water flow

  4. Implementation through Innovation: A Literature-Based Analysis of the Tuning Project

    Science.gov (United States)

    Pálvölgyi, Krisztián

    2017-01-01

    Tuning Educational Structures in Europe is perhaps the most important higher education innovation platform nowadays. The main objective of the Tuning Project is to develop a tangible approach to implement the action lines of the Bologna Process; thus, implementation and innovation are closely linked in Tuning. However, during its development,…

  5. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  6. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  7. United States-Mexico Border Diabetes Prevalence Survey: lessons learned from implementation of the project.

    Science.gov (United States)

    de Cosío, Federico G; Díaz-Apodaca, Beatriz A; Ruiz-Holguín, Rosalba; Lara, Agustín; Castillo-Salgado, Carlos

    2010-09-01

    This paper reviews and discusses the main procedures and policies that need to be followed when designing and implementing a binational survey such as the United States of America (U.S.)-Mexico Border Diabetes Prevalence Study that took place between 2001 and 2002. The main objective of the survey was to determine the prevalence of diabetes in the population 18 years of age or older along U.S.-Mexico border counties and municipalities. Several political, administrative, financial, legal, and cultural issues were identified as critical factors that need to be considered when developing and implementing similar binational projects. The lack of understanding of public health practices, implementation of existing policies, legislation, and management procedures in Mexico and the United States may delay or cancel binational research, affecting the working relation of both countries. Many challenges were identified: multiagency/multifunding, ethical/budget clearances, project management, administrative procedures, laboratory procedures, cultural issues, and project communications. Binational projects are complex; they require coordination between agencies and institutions at federal, state, and local levels and between countries and need a political, administrative, bureaucratic, cultural, and language balance. Binational agencies and staff should coordinate these projects for successful implementation.

  8. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  9. [Results of the implementation of the Bacteremia Zero project in Catalonia, Spain].

    Science.gov (United States)

    Alvarez-Lerma, Francisco; Oliva, Glòria; Ferrer, Joan M; Riera, Alba; Palomar, Mercedes

    2014-07-01

    The nationwide Bacteremia Zero (BZ) Project consists in the simultaneous implementation of measures to prevent central venous catheter-related bacteremia (CVC-B) in critically ill patients and in the development of an integral safety plan. The objective is to present the results obtained after the implementation of the BZ project in the ICUs of the Autonomous Community of Catalonia, Spain. All patients admitted to ICUs in Catalonia participating in the ENVIN-HELICS registry between January 2009 and June 2010 were included. Information was provided by 36 (92.3%) of the total possible 39 ICUs. A total of 281 episodes of CVC-B were diagnosed (overall rate of 2.53 episodes per 1000 days of CVC). The rates have varied significantly between ICUs that participated in the project for more or less than 12 months (2.17 vs. 4.27 episodes per 1000 days of CVC, respectively; p<.0001). The implementation of the BZ Project in Catalonia has been associated with a decrease greater than 40% in the CVC-B rates in the ICUs of this community, which is much higher than the initial objective of 4 episodes per 1000 days of CVC). Copyright © 2014. Published by Elsevier Espana.

  10. Joint implementation demo project between Denmark and Estonia - Phase 1. Final report

    International Nuclear Information System (INIS)

    2003-09-01

    This project is meant to contribute to form the basis of co-operation between Denmark and Estonia as regards Joint Implementation (JI) and thus gather experience in preparation for practical use of JI. A number of questions can be raised for discussion within this project: What is the scope for JI? What is the role of the host country government? Will JI survive the emerging Emission Trading? The project report gives a status of the present situation within the area of JI both internationally and in Estonia, including a resume of the Estonian National Climate Programme. Furthermore, a stakeholder analysis is presented, along with an illustration of the effect of Joint Implementation in the various energy sectors. (BA)

  11. Assessment of an implementation project for a voip system: a case in the food industry

    Directory of Open Access Journals (Sweden)

    Tiago José Menezes Gonçalves

    2011-09-01

    Full Text Available In the twenty-first century, all organizations are affected directly or indirectly by the use of information technology and communication (ICT. The preparation of good projects to implement these technologies is relevant for a company to remain competitive compared to its competitors. In this context, this study analyzes the economic viability for the implementation of a communication system based on VoIP (Voice on Internet Protocol in a food company of the industrial sector. In this way, we compared the existing telephony system in the company with a proposed project for implementation of a VoIP system. Therefore, we performed the modeling of costs incurred through of equations and we used as indicators of project viability the break-even point analysis, the payback period analysis, the net present value and the internal rate of return. As result, it was concluded that the implementation of VoIP-based systems can result in large cost saving, allowing rapidly recovering of the capital invested in the project. This conclusion was confirmed by the analysis of all the indicators cited above, which allowed to recommend the implementation of the project and verify the applicability of cost models developed.

  12. Preliminary sensitivity analyses of corrosion models for BWIP [Basalt Waste Isolation Project] container materials

    International Nuclear Information System (INIS)

    Anantatmula, R.P.

    1984-01-01

    A preliminary sensitivity analysis was performed for the corrosion models developed for Basalt Waste Isolation Project container materials. The models describe corrosion behavior of the candidate container materials (low carbon steel and Fe9Cr1Mo), in various environments that are expected in the vicinity of the waste package, by separate equations. The present sensitivity analysis yields an uncertainty in total uniform corrosion on the basis of assumed uncertainties in the parameters comprising the corrosion equations. Based on the sample scenario and the preliminary corrosion models, the uncertainty in total uniform corrosion of low carbon steel and Fe9Cr1Mo for the 1000 yr containment period are 20% and 15%, respectively. For containment periods ≥ 1000 yr, the uncertainty in corrosion during the post-closure aqueous periods controls the uncertainty in total uniform corrosion for both low carbon steel and Fe9Cr1Mo. The key parameters controlling the corrosion behavior of candidate container materials are temperature, radiation, groundwater species, etc. Tests are planned in the Basalt Waste Isolation Project containment materials test program to determine in detail the sensitivity of corrosion to these parameters. We also plan to expand the sensitivity analysis to include sensitivity coefficients and other parameters in future studies. 6 refs., 3 figs., 9 tabs

  13. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  14. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  15. 77 FR 10740 - Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-23

    ...] Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing The..., will conduct a random drawing to determine the filing priority of the applicants identified in this... regulations.\\2\\ The priority established by this drawing will be used to determine which applicant, among...

  16. Sludge Treatment Project Engineered Container Retrieval And Transfer System Preliminary Design Hazard Analysis Supplement 1

    International Nuclear Information System (INIS)

    Franz, G.R.; Meichle, R.H.

    2011-01-01

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  17. Causes and remedies for the dominant risk factors in Enterprise System implementation projects: the consultants' perspective.

    Science.gov (United States)

    Lech, Przemysław

    2016-01-01

    The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.

  18. Korttidsbehandling af depressioner. Implementering af gruppebaseret kognitiv adfaerdsterapi

    DEFF Research Database (Denmark)

    Lau, Marianne Engelbrecht; Calmer, Juno Berit; Bramsen, J.

    2008-01-01

    with a large Effect Size (ES) on psychiatric/depression symptoms (SCL-90R) and function level (GAF), as well as moderate ES on the degree of hopelessness (BHS). CONCLUSION: The development and clinical implementation of a manual in cognitive behavioral group therapy has resulted in this treatment now being...... for the purpose of clinical implementation. The aim of the present project was to develop such a manual and complete a preliminary evaluation of the outcome. MATERIALS AND METHODS: A therapy manual consisting of 12 group sessions of 2 hours duration was developed. A constituent part of the evaluation...

  19. 77 FR 9231 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing The... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  20. 77 FR 9231 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing The Commission..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  1. 77 FR 9230 - Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing The Commission... her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  2. 77 FR 9230 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing The... Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  3. 77 FR 9232 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing The..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  4. Opportunities and criticisms of voluntary emission reduction projects developed by Public Administrations: Analysis of 143 case studies implemented in Italy

    International Nuclear Information System (INIS)

    Gallo, Michela; Del Borghi, Adriana; Strazza, Carlo; Parodi, Lara; Arcioni, Livia; Proietti, Stefania

    2016-01-01

    Highlights: • 143 voluntary emission reduction projects have been analysed. • The projects belong to renewable energy, energy efficiency and transport sectors. • Voluntary emission reduction standards and methodologies have been applied. • The paper identified the main criticisms for each sector. • Energy efficiency projects are the most promising for public entities. - Abstract: The United Nations Framework Convention on Climate Change (UNFCCC) sets an overall framework for intergovernmental efforts to tackle the challenge posed by climate change. Besides the “flexibility mechanisms” defined by the Kyoto Protocol to lower the overall costs of achieving their emissions targets, The Voluntary Green House Gases (GHG) reduction projects can have a lead role in GHG reduction in “non Emissions Trading System ETS sectors”. Nowadays, the voluntary market is characterised by critical aspects, such as fragmentation, lack of accounting, monitoring and validation rules that have led to the low spread of voluntary emission reduction projects developed by local authorities in the European Union despite their high potentiality. The aim of this paper is to test the applicability of voluntary emission reduction projects in the public sector following a homogeneous and consistent pattern. A research has been performed at local level on 143 voluntary emission reduction projects implemented by Public Administrations in Northern and Central Italy in renewable energy, energy efficiency and transport sectors. The applicable standards and methodologies have been checked and the case studies have been analysed though a three-step process: Preliminary additionality assessment; Projects selection; Validation of the selected project. The assessment shows that energy efficiency projects, once overcoming additionality issues, are the most promising for public entities while renewable energy and transport projects resulted to be mainly affected by double counting problems and

  5. Consensus implementation of a groundwater remediation project at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Hastings, K.R.; Carlson, D.S.

    1996-01-01

    Because of significant characterization uncertainties existing when the Record of Decision was signed and the unfavorable national reputation of groundwater pump and treat remediation projects, the Test Area North (TAN) groundwater ROD includes the evaluation of five emerging technologies that show potential for treating the organic contamination in situ or reducing the toxicity of contaminants above ground. Treatability studies will be conducted to ascertain whether any may be suitable for implementation at TAN to yield more timely or cost effective restoration of the aquifer. The implementation approach established for the TAN groundwater project is a consensus approach, maximizing a partnership relation with stakeholders in constant, iterative implementation decision making

  6. The Hel Peninsula – Smart Grid Pilot Project

    Directory of Open Access Journals (Sweden)

    Sławomir Noske

    2014-12-01

    Full Text Available The paper presents the scope and results of engineering, and the scope of Smart Grid deployment in the Hel Peninsula. The following functionalities will be described: Fault Detection, Isolation & Recovery – FDIR function, Integrated Volt/Var Control (IVVC function, advanced supervision of LV grid, including distributed energy resources. The paper contains implementation results and research findings, as well as preliminary cost-benefit analysis of the project. Moreover, since Smart Metering and Smart Grid projects are being deployed in the same region – the Hel Peninisula – the benefit achieved by merging the two projects will be explained.

  7. Leadership in Real Time : A Model of Attributes Needed by a Project Manager in ERP Implementations

    OpenAIRE

    Gunson, John; De Blasis, Jean-Paul; Neary, Mary

    2003-01-01

    The characteristics and organizational impacts of an Enterprise Resource Planning (ERP) Implementation Project requires highly professional Project Manager skills and attributes. Some may be learned or bought but the more important skills need to be part of the Project Manager's personal makeup. Coaching, mentoring and leadership skills (and beyond) help the Project Manager to take right decisions as even unknown-unknown situations arise during the implementation. This paper contributes to id...

  8. ANALYTICAL AND SCIENTIFIC REVIEW OF PROJECTS AND PROGRAMMES ON CHANGES STRATEGY IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    MLODETSKYY V. R.

    2017-01-01

    Full Text Available Formulation of the problem. Sustainable and successful functioning of the organization in today's competitive market conditions is possible if the organization is an open dynamic system capable of timely and adequately adapt to changes in the environment, this organization should initiate the implementation of innovations, both in production and organizational structure. Most suited for these conditions are project-oriented organizations, when the program's development strategy is developed with a detailed individual relatively independent stages, which are implemented as part of projects. In accordance with the development and improvement of the organization of control systems in the direction of increasing emphasis on the development strategy in relation to operating activities is an important task. Goal and tasks. Explore the hierarchical control system of project-oriented organization towards establishing information flows combine program management system with project management subsystems, included in this program. Conclusions. Concretized the concept of "program" and "project" as a result assumed that the program management is a permanent process in the organization that is adaptable to external changes, and project management (as defined is temporary, so the project management structure are subject to program management structures and are not permanent in the organization's management system.

  9. Identifying and prioritizing barriers to implementation of smart energy city projects in Europe: An empirical approach

    International Nuclear Information System (INIS)

    Mosannenzadeh, Farnaz; Di Nucci, Maria Rosaria; Vettorato, Daniele

    2017-01-01

    Successful implementation of smart energy city projects in Europe is crucial for a sustainable transition of urban energy systems and the improvement of quality of life for citizens. We aim to develop a systematic classification and analysis of the barriers hindering successful implementation of smart energy city projects. Through an empirical approach, we investigated 43 communities implementing smart and sustainable energy city projects under the Sixth and Seventh Framework Programmes of the European Union. Validated through literature review, we identified 35 barriers categorized in policy, administrative, legal, financial, market, environmental, technical, social, and information-and-awareness dimensions. We prioritized these barriers, using a novel multi-dimensional methodology that simultaneously analyses barriers based on frequency, level of impact, causal relationship among barriers, origin, and scale. The results indicate that the key barriers are lacking or fragmented political support on the long term at the policy level, and lack of good cooperation and acceptance among project partners, insufficient external financial support, lack of skilled and trained personnel, and fragmented ownership at the project level. The outcome of the research should aid policy-makers to better understand and prioritize implementation barriers to develop effective action and policy interventions towards more successful implementation of smart energy city projects. - Highlights: • A solid empirical study on the implementation of European smart energy city projects. • We found 35 barriers in nine dimensions; e.g. policy, legal, financial, and social. • We suggested a new multi-dimensional methodology to prioritize barriers. • Lacking or fragmented political support on the long term is a key barrier. • We provided insights for action for project coordinators and policy makers.

  10. 77 FR 9231 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing The Commission... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  11. Landscape ecological impact of climatic change some preliminary findings of the LICC Project

    International Nuclear Information System (INIS)

    Boer, M.M.

    1991-01-01

    The main objectives of the LICC project are to address the potential effects of a future climatic change on (semi-) natural terrestrial ecosystems and landscapes in Europe; six case studies are covered: alpine regions, boreal and subartic regions, Mediterranean region, fluvial systems, wetlands and coastal dunes. Preliminary findings showed a serious lack in fundamental ecological knowledge. Assessment of potential effects involved changes in water and sediment fluxes, changes in the vegetation cover, species response, dispersal and migration in a fragmented landscape and modification of climate impacts by man

  12. Training implementation matrix. Spent Nuclear Fuel Project (SNFP)

    International Nuclear Information System (INIS)

    EATON, G.L.

    2000-01-01

    This Training Implementation Matrix (TIM) describes how the Spent Nuclear Fuel Project (SNFP) implements the requirements of DOE Order 5480.20A, Personnel Selection, Qualification, and Training Requirements for Reactor and Non-Reactor Nuclear Facilities. The TIM defines the application of the selection, qualification, and training requirements in DOE Order 5480.20A at the SNFP. The TIM also describes the organization, planning, and administration of the SNFP training and qualification program(s) for which DOE Order 5480.20A applies. Also included is suitable justification for exceptions taken to any requirements contained in DOE Order 5480.20A. The goal of the SNFP training and qualification program is to ensure employees are capable of performing their jobs safely and efficiently

  13. The Optimizing Patient Transfers, Impacting Medical Quality, andImproving Symptoms:Transforming Institutional Care approach: preliminary data from the implementation of a Centers for Medicare and Medicaid Services nursing facility demonstration project.

    Science.gov (United States)

    Unroe, Kathleen T; Nazir, Arif; Holtz, Laura R; Maurer, Helen; Miller, Ellen; Hickman, Susan E; La Mantia, Michael A; Bennett, Merih; Arling, Greg; Sachs, Greg A

    2015-01-01

    The Optimizing Patient Transfers, Impacting Medical Quality, and Improving Symptoms: Transforming Institutional Care (OPTIMISTIC) project aims to reduce avoidable hospitalizations of long-stay residents enrolled in 19 central Indiana nursing facilities. This clinical demonstration project, funded by the Centers for Medicare and Medicaid Services Innovations Center, places a registered nurse in each nursing facility to implement an evidence-based quality improvement program with clinical support from nurse practitioners. A description of the model is presented, and early implementation experiences during the first year of the project are reported. Important elements include better medical care through implementation of Interventions to Reduce Acute Care Transfers tools and chronic care management, enhanced transitional care, and better palliative care with a focus on systematic advance care planning. There were 4,035 long-stay residents in 19 facilities enrolled in OPTIMISTIC between February 2013 and January 2014. Root-cause analyses were performed for all 910 acute transfers of these long stay residents. Of these transfers, the project RN evaluated 29% as avoidable (57% were not avoidable and 15% were missing), and opportunities for quality improvement were identified in 54% of transfers. Lessons learned in early implementation included defining new clinical roles, integrating into nursing facility culture, managing competing facility priorities, communicating with multiple stakeholders, and developing a system for collecting and managing data. The success of the overall initiative will be measured primarily according to reduction in avoidable hospitalizations of long-stay nursing facility residents. © 2014, Copyright the Authors Journal compilation © 2014, The American Geriatrics Society.

  14. Implementation of NUREG-1318 guidance within the Yucca Mountain Project

    International Nuclear Information System (INIS)

    La Monica, L.B.; Waddell, J.D.; Hardin, E.L.

    1990-01-01

    The US Department of Energy's Yucca Mountain Project is implementing a quality assurance program that fulfills the requirements of the US Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, ''Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements'' for identification of items and activities important to public radiological safety and waste isolation. The process and organization for implementing this guidance is discussed. 3 refs., 2 figs

  15. Air Traffic Control: Status of FAA's Implementation of the Display System Replacement Project

    National Research Council Canada - National Science Library

    1999-01-01

    ...) implementation of the Display System Replacement (DSR) project. DSR, which replaces the controllers' workstations and other equipment in the nation's en route centers, is one of FAA's major projects under the air traffic control modernization program...

  16. PROSPECTS OF CCS PROJECTS IMPLEMENTATION IN RUSSIA: ENVIRONMENTAL PROTECTION AND ECONOMIC OPPORTUNITIES

    Directory of Open Access Journals (Sweden)

    Pavel Tcvetkov

    2016-04-01

    Full Text Available The urgency of environmental protection is determined by its intensive change because of human impact, which, among other things, accompanied by an increasing of carbon dioxide (CO2 emissions. One of the ways to reduce the emission is Carbon Capture and Storage (CCS technologies. To date, developed countries have successfully implemented a number of CCS demonstration projects. Their main purpose is to study the effectiveness of CO2 storage. Russia is one of the world’s largest producers of CO2 emissions. However, CO2 capture and storage issues are not studied by Russian enterprises due to the absence of environmental taxes. The experience of developed countries shows that CO2 storage projects, in addition to the reduction of anthropogenic impact, can be commercially effective not only by reducing the tax burden. This review presents the analysis of international experience in the field of CO2 capture and storage. Given the immaturity of technology and lack of the necessary volume of statistical data, it was an attempt to determine the minimum conditions, which permit the implementation of CCS projects in Russian oil fields. On the basis of the Russian development forecast and the fuel balance structure the volumes of CO2 emissions in the 2016–2030 years were calculated. According to significant difference in opinions about the feasibility of CCS implementation in Russia, this review presents the main arguments for and against such projects. Evaluation of the potential effectiveness of CCS projects to enhance oil recovery factor showed that in spite of the absence of CO2 emissions taxes, such projects could be commercially effective in Russia due to the increase in oil recovery.

  17. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Directory of Open Access Journals (Sweden)

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  18. Appreciation of a Child’s Journey: Implementation of a Cardiac Action Research Project

    Directory of Open Access Journals (Sweden)

    Kate Alexa Dengler

    2012-01-01

    Full Text Available The aim of this paper is to provide an overview of the phases of the action research process involved in developing, implementing, and evaluating the Heart Beads program. The aim of the project is to enrich the hospital experience of children with cardiac conditions. Heart Beads involves children receiving unique beads specific to each cardiac treatment, procedure or event in recognition of their experiences, and endurance. An action research approach, involving a partnership between clinicians and researchers and emphasising the involvement of patients and their families, was used to guide the Heart Beads program. The project followed the five phases of action research: identification, investigation, program development, implementation, and evaluation. Heart Beads began as a small project which continues to grow in popularity and significance with children at a tertiary paediatric hospital in Sydney, Australia. The program is now being implemented nationwide with the vision that all Australian children hospitalised with cardiac conditions can benefit from Heart Beads.

  19. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  20. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  1. EGNOS Monitoring Prepared in Space Research Centre P.A.S. for SPMS Project

    Science.gov (United States)

    Swiatek, Anna; Jaworski, Leszek; Tomasik, Lukasz

    2017-12-01

    The European Geostationary Overlay Service (EGNOS) augments Global Positioning System (GPS) by providing correction data and integrity information for improving positioning over Europe. EGNOS Service Performance Monitoring Support (SPMS) project has assumed establishment, maintenance and implementation of an EGNOS performance monitoring network. The paper presents preliminary results of analyses prepared in Space Research Centre, Polish Academy of Sciences (Warsaw), as one of partners in SPMS project.

  2. The Geographic Climate Information System Project (GEOCLIMA): Overview and preliminary results

    Science.gov (United States)

    Feidas, H.; Zanis, P.; Melas, D.; Vaitis, M.; Anadranistakis, E.; Symeonidis, P.; Pantelopoulos, S.

    2012-04-01

    The project GEOCLIMA aims at developing an integrated Geographic Information System (GIS) allowing the user to manage, analyze and visualize the information which is directly or indirectly related to climate and its future projections in Greece. The main components of the project are: a) collection and homogenization of climate and environmental related information, b) estimation of future climate change based on existing regional climate model (RCM) simulations as well as a supplementary high resolution (10 km x 10 km) simulation over the period 1961-2100 using RegCM3, c) compilation of an integrated uniform geographic database, and d) mapping of climate data, creation of digital thematic maps, and development of the integrated web GIS application. This paper provides an overview of the ongoing research efforts and preliminary results of the project. First, the trends in the annual and seasonal time series of precipitation and air temperature observations for all available stations in Greece are assessed. Then the set-up of the high resolution RCM simulation (10 km x 10 km) is discussed with respect to the selected convective scheme. Finally, the relationship of climatic variables with geophysical features over Greece such as altitude, location, distance from the sea, slope, aspect, distance from climatic barriers, land cover etc) is investigated, to support climate mapping. The research has been co-financed by the European Union (European Regional Development Fund) and Greek national funds through the Operational Program "Competitiveness and Entrepreneurship" of the National Strategic Reference Framework (NSRF) - Research Funding Program COOPERATION 2009.

  3. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  4. Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects

    Energy Technology Data Exchange (ETDEWEB)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-11-30

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.

  5. Chromosomocentric approach to overcoming difficulties in implementation of international project Human Proteome

    Directory of Open Access Journals (Sweden)

    A. I. Archakov

    2013-12-01

    Full Text Available The international project Human Proteome (PHP, being a logical continuation of the project Human Genome, was started on September 23, 2010. In correspondence with the genocentric approach, the PHP aim is to prepare a catalogue of all human proteins and to decipher a network of their interactions. The PHP implementation difficulties arise because the research subject itself – proteome – is much more complicated than genome. The major problem is the insufficient sensitivity of proteome methods that does not allow detecting low- and ultralow-copy proteins. Bad reproducibility of proteome methods and the lack of so-called “gold standard” is the second major complicacy in PHP implementation. The third problem is the dynamic character of proteome, its instabili­ty in time. The paper deals with possible variants of overcoming these complicacies, preventing from successful implementation of PHP.

  6. The project organization as a policy tool in implementing welfare reforms in the public sector.

    Science.gov (United States)

    Jensen, Christian; Johansson, Staffan; Löfström, Mikael

    2013-01-01

    Organizational design is considered in policy literature as a forceful policy tool to put policy to action. However, previous research has not analyzed the project organization as a specific form of organizational design and, hence, has not given much attention to such organizations as a strategic choice when selecting policy tools. The purpose of the article is to investigate the project as a policy tool; how do such temporary organizations function as a specific form of organization when public policy is implemented? The article is based on a framework of policy implementation and is illustrated with two welfare reforms in the Swedish public sector, which were organized and implemented as project organizations. The case studies and the analysis show that it is crucial that a project organization fits into the overall governance structure when used as a policy tool. If not, the project will remain encapsulated and will not have sufficient impact on the permanent organizational structure. The concept of encapsulation indicates a need to protect the project from a potential hostile environment. The implication of this is that organizational design as a policy tool is a matter that deserves more attention in the strategic discussion on implementing public policies and on the suitability of using certain policy tools. Copyright © 2012 John Wiley & Sons, Ltd.

  7. Alcolocks : factors influencing implementation, participation and compliance : literature review contributed to the EU project Alcolock Implementation in the European Union.

    NARCIS (Netherlands)

    Mathijssen, M.P.M.

    2007-01-01

    In 2004-2005, a series of alcolock field trials were conducted in four European countries, in the framework of the EU research project Alcolock Implementation in the European Union. This project was granted by the European Commission, Directorate-General for Energy and Transport (DG-TREN). As part

  8. Preliminary reports on fiscal 2000 results of project for subsidizing international joint research; 2000 nendo kokusai kyodo kenkyu josei jigyo seika hokoku kai yokoshu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    This paper presents preliminary reports on fiscal 2000 results of project for subsidizing international joint research sponsored by NEDO. For international joint research teams doing excellent studies, their research expenses are subsidized, thereby promoting international research exchange, enhancing international level of industrial technology and contributing to the formation of basis for innovative industrial technology. The projects relating to the global environmental field are implemented jointly with RITE. The contents of the report to be published are, in the global environmental field (practicability study), development of oil substitute resources, reproducible resources, and technologies for producing polymeric and plastic materials benign to the earth by microorganism using carbon dioxide. In the substance/material field, the contents of the report are innovative production and device application of tunable photonic crystals using electronic penetration network; development of new synthesis process of innovative nitride, creation and theoretical calculation of electromagnetic function; studies on quantum transportation in superconductor and semiconductor bonding structures; and studies on quantum liquid and solid, and application to materials science and technology. (NEDO)

  9. Storytelling Practices in Project Management : Exploratory study in new business process implementation in Information and Communication Technology projects

    OpenAIRE

    Abdubaliev, Ulukbek; Akysheva, Aizhan

    2017-01-01

    Stories have always been present in the life of people as a part of their culture, it is a rather ancient narrative technique. The message delivered in a form of a story is specifically appealing to listeners, which makes it a powerful communication tool. The thesis explores storytelling practices in project management by answering the question: “How project managers use storytelling in new business process implementation in ICT projects?” The choice of the topic was driven by the gap in the ...

  10. Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.

    Science.gov (United States)

    Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I

    2012-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.

  11. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  12. Role Of Non-Governmental Organizations Leadership In The Implementation Of Community Development Projects In Arumeru District Tanzania

    Directory of Open Access Journals (Sweden)

    Rajabu Ally Mtunge

    2015-08-01

    Full Text Available The purpose of this study was to examine the role of leadership in the implementation of community development projects by local non-governmental organizations in Arumeru District Tanzania. The study applied survey design which covered the sample of 46 respondents including District Executive Director District Social Workers Non-Governmental Organization leaders workers and volunteers and community members in Arumeru district Tanzania. The study employed simple random sampling technique in order to ensure equal chance of an individual being involved in this study as inferential statistics considered. Data collected from a sample of 46 NGOs employees using a semi-structured questionnaire with both closed and open-ended questions. The collected data analyzed using both descriptive and inferential statistics. The descriptive statistical tools used included frequencies mean and standard deviation while inferential statistical tool used was correlation. Statistical Package for the Social Sciences SPSS version 19 used for analyzing the data collected. The study achieved a response of 46 out of a sample of 47 representing a response rate of 97.87. The results show that a significant number of NGOs 34.8 had not completed their projects 21.7 stated that less than five projects were complete and 43.5 of the respondents confirmed that more than five projects not completed over the last one year. Regarding the influence of leadership on implementation of project spearmans rank correlation revealed a very strong positive correlation 0.910 between of leadership vision and implementation of community development projects a strong positive correlation between communication and implementation of community development projects rho 0.730 n 46 p .001 strong positive correlation between commitment and implementation of community developmental projects which was statistically significant rs .601 p .000 and a positive correlation between accountability and

  13. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  14. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  15. Rural telemedicine project in northern New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Zink, S.; Hahn, H.; Rudnick, J.; Snell, J.; Forslund, D. [Los Alamos National Lab., NM (United States); Martinez, P. [Northern New Mexico Community Coll., Espanola, NM (United States)

    1998-12-31

    A virtual electronic medical record system is being deployed over the Internet with security in northern New Mexico using TeleMed, a multimedia medical records management system that uses CORBA-based client-server technology and distributed database architecture. The goal of the NNM Rural Telemedicine Project is to implement TeleMed into fifteen rural clinics and two hospitals within a 25,000 square mile area of northern New Mexico. Evaluation of the project consists of three components: job task analysis, audit of immunized children, and time motion studies. Preliminary results of the evaluation components are presented.

  16. Biomass energy projects for joint implementation of the UN FCCC [Framework Convention on Climate Change

    International Nuclear Information System (INIS)

    Swisher, Joel N.; Renner, Frederick P.

    1998-01-01

    The UN Framework Convention on Climate Change (FCCC) allows for the joint implementation (JI) of measures to mitigate the emissions of greenhouse gases. The concept of JI refers to the implementation of such measures in one country with partial or full financial and/or technical support from another country, potentially fulfilling some of the supporting country's emission-reduction commitment under the FCCC. This paper addresses some key issues related to JI under the FCCC as they relate to the development of biomass energy projects for carbon offsets in developing countries. Issues include the reference case or baseline, carbon accounting and net carbon storage, potential project implementation barriers and risks, monitoring and verification, local agreements and host-country approval. All of these issues are important in project design and evaluation. We discuss briefly several case studies, which consist of a biomass-fueled co-generation projects under development at large sugar mills in the Philippines, India and Brazil, as potential JI projects. The case studies illustrate the benefits of bioenergy for reducing carbon emissions and some of the important barriers and difficulties in developing and crediting such projects. Results to date illustrate both the achievements and the difficulties of this type of project. (author)

  17. Potential implementation of light steel housing system for affordable housing project in Malaysia

    Science.gov (United States)

    Saikah, M.; Kasim, N.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. A.

    2017-11-01

    An unparalleled number between housing demand and housing supply in Malaysia has increased the housing prices, which gives consequences to the homeownership issue. One way to reduce the housing price is by faster increase the number of affordable housing, but the construction sector faces difficulties in delivering as expected number by using conventional and current industrialised building system (IBS) due to the issue related high project cost, time and labour. Therefore, light steel housing (LSH) system as one of another type of IBS method can be utilised in housing construction project. This method can replace the conventional method that was currently used in the construction of affordable housing project. The objectives of this study are to identify the potential of LSH and influencing factors of system implementation. This is an initial stage to review the previous study related to LSH implementation in developed and developing countries. The previous study will be analysed regarding advantages and disadvantages of LSH and factors that influence the implementation of the system. Based on the literature review it is expected to define the potential and influencing factors of the LSH system. The findings are meaningful in framing and enhance construction housing method of an affordable housing project in Malaysia.

  18. Design and implementation of a financial planning and tracking system for the Nova Project

    International Nuclear Information System (INIS)

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation

  19. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  20. Preliminary waste acceptance requirements - Konrad repository project

    International Nuclear Information System (INIS)

    Brennecke, P.W.; Warnecke, E.H.

    1991-01-01

    In Germany, the planned Konrad repository is proposed for the disposal of all types of radioactive wastes whose thermal influence upon the host rock is negligible. The Bundesamt fuer Strahlenschutz has established Preliminary Waste Acceptance Requirements (as of April 1990) for this facility. The respective requirements were developed on the basis of the results of site-specific safety assessments. They include general requirements on the waste packages to be disposed of as well as more specific requirements on the waste forms, the packaging and the radionuclide inventory per waste package. In addition, the delivery of waste packages was regulated. An outline of the structure and the elements of the Preliminary Waste Acceptance Requirements of April 1990 is given including comments on their legal status. (Author)

  1. How internal audit can contribute to the success of ERP implementation projects in an Irish context.

    OpenAIRE

    Bennett, John Michael Anthony

    2014-01-01

    non-peer-reviewed The aim of this study is to explore how Internal Audit can contribute towards the successful implementation of ERP (Enterprise Resource Planning) projects in an Irish context. ERP projects are well documented for high failure rates and adverse impact on receiving businesses. Although there is limited literature available concerning the role of Internal Audit within ERP implementations, there is plenty available relating to ERP implementations which document risks, problem...

  2. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  3. The Planning, Implementation and Evaluation of a Character-Based School Culture Project in Taiwan

    Science.gov (United States)

    Lee, Chi-Ming

    2009-01-01

    This study focused on the planning, implementation and evaluation of a character-based school culture (CBSC) project in Taiwan. The project integrated the principles of justice, caring and developmental discipline and was influenced by several well-known American models of character education programmes. The CBSC project was conducted in a…

  4. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  5. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  6. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  7. Preliminary assessment of potential CDM early start projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, S.; Sathaye, J.; Lehman, B.; Schumacher, K.; van Vliet, O.; Moreira, J.R.

    2000-11-01

    The Brazil/US Aspen Global Forum on Climate Change Policies and Programs has facilitated a dialogue between key Brazil and US public and private sector leaders on the subject of the Clean Development Mechanism (CDM). With support from the US government, a cooperative effort between Lawrence Berkeley National Laboratory and the University of Sao Paulo conducted an assessment of a number of projects put forth by Brazilian sponsors. Initially, we gathered information and conducted a screening assessment for ten projects in the energy sector and six projects in the forestry sector. Some of the projects appeared to offer greater potential to be attractive for CDM, or had better information available. We then conducted a more detailed assessment of 12 of these projects, and two other projects that were submitted after the initial screening. An important goal was to assess the potential impact of Certified Emission Reductions (CERs) on the financial performance of projects. With the exception of the two forestry-based fuel displacement projects, the impact of CERs on the internal rate of return (IRR) is fairly small. This is true for both the projects that displace grid electricity and those that displace local (diesel-based) electricity production. The relative effect of CERs is greater for projects whose IRR without CERs is low. CERs have a substantial effect on the IRR of the two short-rotation forestry energy substitution projects. One reason is that the biofuel displaces coke and oil, both of which are carbon-intensive. Another factor is that the product of these projects (charcoal and woodfuel, respectively) is relatively low value, so the revenue from carbon credits has a strong relative impact. CERs also have a substantial effect on the NPV of the carbon sequestration projects. Financial and other barriers pose a challenge for implementation of most of the projects. In most cases, the sponsor lacks sufficient capital, and loans are available only at high interest

  8. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  9. EFFECTIVENESS OF AGILE COMPARED TO WATERFALL IMPLEMENTATION METHODS IN IT PROJECTS: ANALYSIS BASED ON BUSINESS INTELLIGENCE PROJECTS

    Directory of Open Access Journals (Sweden)

    Kisielnicki Jerzy

    2017-10-01

    Full Text Available The global Business Intelligence (BI market grew by 7.3% in 2016 according to the Gartner report (2017. Today, organizations require better use of data and analytics to support their business decisions. Internet power and business trend changes have provided a broad term for data analytics - Big Data. To be able to handle it and leverage a value of having access to Big Data, organizations have no other choice than to get proper systems implemented and working. However, traditional methods are not efficient for changing business needs. Long time between project start and go-live causes a gap between initial solution blueprint and actual user requirements at the end of the project. This article presents the latest market trends in BI systems implementation by comparing agile with traditional methods. It presents a case study provided in a large telecommunications company (350 BI users and the results of a pilot research provided in the three large companies: media, digital, and insurance. Both studies prove that agile methods might be more effective in BI projects from an end-user perspective and give first results and added value in a much shorter time compared to a traditional approach.

  10. Project implementation : classification of organic soils and classification of marls - training of INDOT personnel.

    Science.gov (United States)

    2012-09-01

    This is an implementation project for the research completed as part of the following projects: SPR3005 Classification of Organic Soils : and SPR3227 Classification of Marl Soils. The methods developed for the classification of both soi...

  11. Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

    Energy Technology Data Exchange (ETDEWEB)

    Collins, Chris; Corbett, Catherine [Lower Columbia River Estuary Partnership; Ebberts, Blaine [U.S. Army Corps of Engineers

    2009-07-27

    The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed

  12. Gas Regional Initiative. North West Regional Energy Market. Transmission Transparency Project. First Implementation Report

    International Nuclear Information System (INIS)

    2008-07-01

    The purpose of this report is to comment on the implementation of the TSO Transmission Transparency Project. In December 2007 sixteen TSOs presented a project plan which committed them to publishing information on capacity availability and gas flows at crossborder interconnection points in the North-West gas region. The data types to be published were agreed between TSOs and network users. It was agreed that TSOs would release new information on capacity and actual gas flows at crossborder interconnection points. The TSOs have committed to publishing the agreed information by three project milestones May, September or December 2008. At the end of May 2008 the TSOs submitted initial data to Ofgem (Office of the Gas and Electricity Markets) on implementation. This report presents the data submitted by the TSOs, provides comment on implementation progress and explains the next steps. This report does not approve or guarantee the accuracy of the data submitted by TSOs

  13. PRACTICE OF DRAFTING AND IMPLEMENTING OF FINANCING PROJECTS IN NON-FORMAL EDUCATION

    Directory of Open Access Journals (Sweden)

    BUZOIANU Daniela Angela

    2015-06-01

    Full Text Available In Petroleum and Gas University, besides teaching and research activities, a priority is non-formal education area. In the academic center of Ploiesti, the activities of non-formal education take place through Center for Porjects, Programs and Cultural - Artistic events (CPPECA and Student’s Culture House, located in the University campus (CCS. The mission of the Center for Projects, Programs and Cultural - Artistic events and Student’s Culture House is: - To offer a big diversity of activities in non-formal education area for students and teachers; - To become an essential and defining pillar in continous formation of young people. The purpose is to promote excellence also in non-formal education fied , starting from the value and tradition of university education in Romanian oil area The Center for Project, Programs and Cultural - Artistic events (CPPECA and Student’s House of Culture have: • An educational function; • A real multidirectional cultural vocation through: - initiating,implementing and developing cultural projects and programs; - organizing and developing specific events like shows, festivals, national and international contests. The paper presents practical aspects in development and implementation of financing projects in non-formal education field.

  14. Report made on behalf of the commission of foreign affairs about the project of law, adopted by the senate, authorizing the approval of the agreement between the French government and the preliminary commission of the organization of the nuclear test ban treaty, about the conduct of the activities relative to the international control facilities, including the post-certification activities

    International Nuclear Information System (INIS)

    Cazenave, R.

    2003-12-01

    France and the preliminary commission of the comprehensive nuclear test ban treaty organization (CTBTO) concluded on July 13, 2001, an agreement about the conduct of the activities relative to the international surveillance facilities. This agreement aims at organizing the modalities of implementation of the surveillance activities carried out by the technical secretariat of the preliminary committee of CTBTO in the French territory. This document is the report of the French national assembly about the project of law for the approval of this agreement. It presents the difficult implementation of an international test ban system, the French commitment in the comprehensive nuclear test ban treaty (CTBT), and the main dispositions of the agreement of July 13, 2001. (J.S.)

  15. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  16. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  17. A Study of Using Simulation to Overcome Obstacles That Block the Implementation of Critical Chain Project Management to Project Management Environment

    OpenAIRE

    Chia-Ling Huang; Rong-Kwei Li; Chih-Hung Tsai; Yi-Chan Chung; Yao-Wen Hsu

    2014-01-01

    Since 1997, the Critical Chain Project Management (CCPM) method has received considerable attention. Hundreds of successful CCPM cases have achieved highly reliable on-time delivery (OTD) with short project lead-time (PLT) in multi-project environments. However, two obstacles have remained, blocking the implementation of CCPM to project management (PM) society. The first has been addressed by PM practitioners, who have been less than confident that OTD and PLT can be significantly improved by...

  18. Licensing support system preliminary needs analysis: Volume 1

    International Nuclear Information System (INIS)

    1989-01-01

    This Preliminary Needs Analysis, together with the Preliminary Data Scope Analysis (next in this series of reports), is a first effort under the LSS Design and Implementation Contract toward developing a sound requirements foundation for subsequent design work. Further refinements must be made before requirements can be specified in sufficient detail to provide a basis for suitably specific system specifications. This preliminary analysis of the LSS requirements has been divided into a ''needs'' and a ''data scope'' portion only for project management and scheduling reasons. The Preliminary Data Scope Analysis will address all issues concerning the content and size of the LSS data base; providing the requirements basis for data acquisition, cataloging and storage sizing specifications. This report addresses all other requirements for the LSS. The LSS consists of both computer subsystems and non-computer archives. This study addresses only the computer subsystems, focusing on the Access Subsystems. After providing background on previous LSS-related work, this report summarizes the findings from previous examinations of needs and describes a number of other requirements that have an impact on the LSS. The results of interviews conducted for this report are then described and analyzed. The final section of the report brings all of the key findings together and describes how these needs analyses will continue to be refined and utilized in on-going design activities. 14 refs., 2 figs., 1 tab

  19. Implementation of the e-Bug Project in Greece.

    Science.gov (United States)

    Gennimata, Dimitra; Merakou, Kyriakoula; Barbouni, Anastasia; Kremastinou, Jenny

    2011-06-01

    The e-Bug pack and web site educational material has been translated and adapted to the Greek language and educational background, and implemented throughout Greece as a supplementary educational resource in elementary and junior high schools. Elementary and junior high school teachers in Greece have actively participated in the development of the e-Bug educational resource and supported the implementation of all e-Bug activities. Dissemination to all key national stakeholders has been undertaken, and endorsement has been obtained from educational and medical associations, societies and institutions. Independent evaluation has been carried out, as part of dissertation thesis projects, for postgraduate studies. The e-Bug educational resource provides all the essentials for the dissemination of good health behaviours in hygiene, monitoring the spread of infection and the prudent use of antibiotics, to the youth of this country. Its contribution is expected to be evident in the next adult generation.

  20. Geopolitical model of investment power station construction project implementation

    Science.gov (United States)

    Malafeyev, Oleg; Farvazov, Konstantin; Zenovich, Olga; Zaitseva, Irina; Kostyukov, Konstantin; Svechinskaya, Tatiana

    2018-04-01

    Two geopolitical actors implement a geopolitical project that involves transportaion and storage of some commodities. They interact with each other through a transport network. The network consists of several interconnected vertices. Some of the vetrices are trading hubs, storage spaces, production hubs and goods buyers. Actors wish to satify the demand of buyers and recieve the highest possible profit subject to compromise solution principle. A numerical example is given.

  1. Using implementation tools to design and conduct quality improvement projects for faster and more effective improvement.

    Science.gov (United States)

    Ovretveit, John; Mittman, Brian; Rubenstein, Lisa; Ganz, David A

    2017-10-09

    Purpose The purpose of this paper is to enable improvers to use recent knowledge from implementation science to carry out improvement changes more effectively. It also highlights the importance of converting research findings into practical tools and guidance for improvers so as to make research easier to apply in practice. Design/methodology/approach This study provides an illustration of how a quality improvement (QI) team project can make use of recent findings from implementation research so as to make their improvement changes more effective and sustainable. The guidance is based on a review and synthesis of improvement and implementation methods. Findings The paper illustrates how research can help a quality project team in the phases of problem definition and preparation, in design and planning, in implementation, and in sustaining and spreading a QI. Examples of the use of different ideas and methods are cited where they exist. Research limitations/implications The example is illustrative and there is little limited experimental evidence of whether using all the steps and tools in the one approach proposed do enable a quality team to be more effective. Evidence supporting individual guidance proposals is cited where it exists. Practical implications If the steps proposed and illustrated in the paper were followed, it is possible that quality projects could avoid waste by ensuring the conditions they need for success are in place, and sustain and spread improvement changes more effectively. Social implications More patients could benefit more quickly from more effective implementation of proven interventions. Originality/value The paper is the first to describe how improvement and implementation science can be combined in a tangible way that practical improvers can use in their projects. It shows how QI project teams can take advantage of recent advances in improvement and implementation science to make their work more effective and sustainable.

  2. Exploring Factors Affecting Implementation of Public Private Partnership Housing Projects in Bauchi State, Nigeria

    Directory of Open Access Journals (Sweden)

    Mohammed Sani

    2018-03-01

    Full Text Available Public Private Partnership (PPP Housing scheme in Nigeria is intended to complement government effort toward increasing housing stock and providing affordable housing in the country. However, Bauchi state government adopted the construction of 5,000 phases PPP Housing. But 6 years after the commencement of the scheme, only a few numbers of housing units were completed and commissioned. Therefore, it becomes imperative to carry out research on the impact level of those factors affecting the implementation of the scheme. The aim of the study is to investigate impact level of factors affecting the implementation of PPP housing projects in Bauchi state with a view to find out possible ways that will improve the implementation of the scheme. The descriptive and explorative research design was adopted for this study. 54 structured Questionnaires were administered to construction professional’s staff under private housing developers and relevant government agencies in Bauchi state. 42 valid Questionnaires were retrieved and analysed with SPSS software. The result of the quantitative data analysis shows that creation of favourable investment environment and government support have very high Impact on the implementation of Bauchi PPP housing projects. Therefore, this study recommends that government and other stakeholders should give more attention to the creation of favourable investment environment, support in policy formulation and managerial strategies in the future for improving the implementation of PPP housing projects.

  3. Implementation of a dedicated digital projectional radiographic system in thoracic imaging

    International Nuclear Information System (INIS)

    Aberle, D.R.; Batra, P.; Hayrapetian, A.S.; Brown, K.; Morioka, C.A.; Steckel, R.J.

    1988-01-01

    An integrated digital radiographic system was evaluated with respect to image quality and impact on diagnosis relative to conventional chest radiographs for a variety of focal and diffuse lung processes. Digital images were acquired with a stimulable phosphor plate detector that was scanned by a semiconductor laser for immediate digitalization to a 2,048 X 2,464 X 10-bit image. Digital images were displayed on a 2,048-line monitor and printed on 14 X 17-inch film with use of a laser film printer (Kodak). Preliminary results with this system, including the effects of user interaction with the display monitor, inverse intensity display, and regional magnification techniques, indicate that it may be successfully implemented for thoracic imaging

  4. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  5. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  6. Interim district energy implementation

    Energy Technology Data Exchange (ETDEWEB)

    Fearnley, R.; Susak, W. [City of Vancouver, BC (Canada); Johnstone, I. [BCG Services Inc., Vancouver, BC (Canada)

    2001-07-01

    The concept of district energy was introduced in the City of North Vancouver, a city of 45,000, in 1997. A preliminary study was completed in 1997, followed by a tour of some district energy facilities in Finland in the same year. In 1999 a large district energy study was completed by a consultant. The study indicated the need for an investment of $15 million to implement district heating in the City. Lack of sufficient financial resources and immediately connectable heat load, the project was considered a non-starter. Some of the other factors leading to shelving the project included no current significant pricing advantages over competing energy sources and no current opportunity for cogeneration, given the low price that BC Hydro is willing to pay for independently produced power. The project, although shelved for the moment, has not been discarded. Planning and exploration are continuing, aided by the City's commitment to energy efficiency and conservation, its long term planning horizon and its significant influence over the development of some prime real estate.

  7. Variables that impact the implementation of project-based learning in high school science

    Science.gov (United States)

    Cunningham, Kellie

    Wagner and colleagues (2006) state the mediocrity of teaching and instructional leadership is the central problem that must be addressed if we are to improve student achievement. Educational reform efforts have been initiated to improve student performance and to hold teachers and school leaders accountable for student achievement (Wagner et al., 2006). Specifically, in the area of science, goals for improving student learning have led reformers to establish standards for what students should know and be able to do, as well as what instructional methods should be used. Key concepts and principles have been identified for student learning. Additionally, reformers recommend student-centered, inquiry-based practices that promote a deep understanding of how science is embedded in the everyday world. These new approaches to science education emphasize inquiry as an essential element for student learning (Schneider, Krajcik, Marx, & Soloway, 2002). Project-based learning (PBL) is an inquiry-based instructional approach that addresses these recommendations for science education reform. The objective of this research was to study the implementation of project-based learning (PBL) in an urban school undergoing reform efforts and identify the variables that positively or negatively impacted the PBL implementation process and its outcomes. This study responded to the need to change how science is taught by focusing on the implementation of project-based learning as an instructional approach to improve student achievement in science and identify the role of both school leaders and teachers in the creation of a school environment that supports project-based learning. A case study design using a mixed-method approach was used in this study. Data were collected through individual interviews with the school principal, science instructional coach, and PBL facilitator. A survey, classroom observations and interviews involving three high school science teachers teaching grades 9

  8. Integration of models for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Napier, B.A.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals could have received as a result of emissions from nuclear operations at Hanford since 1944. The objective of phase 1 of the project was to demonstrate through calculations that adequate models and support data exist or could be developed to allow realistic estimations of doses to individuals from releases of radionuclides to the environment that occurred as long as 45 years ago. Much of the data used in phase 1 was preliminary; therefore, the doses calculated must be considered preliminary approximations. This paper describes the integration of various models that was implemented for initial computer calculations. Models were required for estimating the quantity of radioactive material released, for evaluating its transport through the environment, for estimating human exposure, and for evaluating resultant doses

  9. Tensions related to implementation of postgraduate degree projects in specialist nursing education.

    Science.gov (United States)

    German Millberg, Lena; Berg, Linda; Lindström, Irma; Petzäll, Kerstin; Öhlén, Joakim

    2011-04-01

    In conjunction with the introduction of the Bologna process in Sweden, specialist nursing education programmes were moved up to the second cycle of higher education with the opportunity to take a one-year master's degree, which also meant that students would undertake a degree project carrying 15 ECTS. The purpose of this study was to examine the introduction of postgraduate degree projects on the second-cycle level into Swedish specialist nursing programmes in accordance with the Bologna process. Five universities were involved and the study design took the form of action research. Problem formulation, planning, evaluation and follow-up with reflection led to new actions over a period of 2 1/2 years. Through a review of local curriculum documents, the implementation of a postgraduate degree project was monitored and these reviews, together with field notes, were analysed by means of constant comparative analysis. The results revealed a variety of tensions that arose when postgraduate degree projects were introduced, taking the form of differing views on the relationship between research, clinical development, specific professional objectives and academic objectives. These tensions were reflected in six areas of change. In summary, it can be noted that implementation of the postgraduate degree projects highlighted tensions related to basic views of learning. Copyright © 2010 Elsevier Ltd. All rights reserved.

  10. Hidropower project implementation. Public investment priorities of Romanian Electricity Authority (RENEL)

    International Nuclear Information System (INIS)

    Bogdan Valeriu; Pencea, Doru

    1994-01-01

    RENEL manages more than 20 hydropower projects in various construction stages. Some of them are multipurpose projects designed for water supply, flood control and irrigation. The construction schedules and completion terms are prolonged for all of them due to insufficient investment funds. Priority in public investment for hydropower projects is necessary because it generates favorable effects for both local communities and national economy. Appropriate methodology and suitable criteria should be established in order to select the projects to be financed taking into account the large initial investments and long implementation terms. The national hydropower potential is around 40,000 GWh/year and the corresponding installed power would be 14,800 MW. At present, the power production capacity is 16,240 GWh/year and the installed hydropower is 5,880 MW. (authors)

  11. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  12. Project Experiences of the Implementation of the Primary Bleed and Feed System

    International Nuclear Information System (INIS)

    Sanz, S.; Lang, J.; Schmid, J.

    2015-01-01

    Modernization activities play a very important role in the enhancement of the safety and reliability of nuclear power plants. The main focus is on increasing the plant availability, the operational flexibility or the integration of new, additional equipment to satisfy safety requirements, as in this case with the implementation of the design modification primary circuit “Primary Bleed & Feed” (PB&F) of the primary circuit, in the consideration of a beyond design basis accident. Primary B&F prevents the high pressure core melt path and allows an additional alternative heat removal by depressurising the primary system and coolant injection with passive and/or active low pressure systems, when the normal core cooling is not available because of loss of water inventory in the steam generators. The goal of this paper is to show some general good practices gained during the implementation of the Primary Bleed and Feed, System from the project conception to the system implementation. Basically, practice shows that some of the crucial factors which contributed to a successful project execution were based on (i) good interface management between the new system and the existing plant components, (ii) a close coordination of the single engineering disciplines and simultaneous activities, (iii) safety culture and quality assurance were set as priority during the entire project development. (author)

  13. Implementation of a Project-Based Engineering School: Increasing Student Motivation and Relevant Learning

    Science.gov (United States)

    Terrón-López, María-José; García-García, María-José; Velasco-Quintana, Paloma-Julia; Ocampo, Jared; Vigil Montaño, María-Reyes; Gaya-López, María-Cruz

    2017-01-01

    The School of Engineering at Universidad Europea de Madrid (UEM) implemented, starting in the 2012-2013 period, a unified academic model based on project-based learning as the methodology used throughout the entire School. This model expects that every year, in each grade, all the students should participate in a capstone project integrating the…

  14. ASSESSMENT OF THE INQUIRY-BASED PROJECT IMPLEMENTATION PROCESS IN SCIENCE EDUCATION UPON STUDENTS’ POINTS OF VIEWS

    Directory of Open Access Journals (Sweden)

    Orhan AKINOGLU

    2008-01-01

    Full Text Available Aim of the study is to assess how students in 6th, 7th and 8th grades of primary education see the project works made in science education and their implementation processes. The study was fulfilled upon the descriptive survey model to collect data. Participants of the research were 100 students who had project implementation experiences in science education, and they were from 24 primary schools in 7 districts randomly chosen in the city of Istanbul in Turkey. Data of the study were collected by using a semi-constructed interview form offered to students during the 2005-2006 teaching year. In the research, following items were examined: The extent to which students are inspired from the previously made projects during their own project selection process, the level of scientific document survey and the effects of contemporary events, science and technology class topics and students’ interest areas. It was seen that internet is the mostly used source to obtain information. For students, one of the most problematic issues faced during the project implementation is the time limits set out by teacher. It was found that the most obvious benefit obtained by students from the project works is their increasing interest towards science and technology class. The most significant change seen by students regarding project preparation is their increasing grades in exams during and following the project works.

  15. The Impact of an Implementation Project on Primary Care Staff Perceptions of Delivering Brief Alcohol Advice

    Directory of Open Access Journals (Sweden)

    Hanna Reinholdz

    2016-01-01

    Full Text Available Objective. To explore how the perceptions and experiences of working with risky drinkers change over time among primary health care staff during a systematic implementation project. Methods. Qualitative focus group interviews took place before and after the implementation of the project. Results. The staff displayed a positive change during the implementation period with regard to awareness, knowledge, and confidence that led to a change in routine practice. Throughout the project, staff were committed to engaging with risky drinkers and appeared to have been learning-by-doing. Conclusions. The results indicated a positive attitude to alcohol prevention work but staff lack knowledge and confidence in the area. The more practical experience during the study is, the more confidence seems to have been gained. This adds new knowledge to the science of implementation studies concerning alcohol prevention measures, which have otherwise shown disappointing results, emphasizing the importance of learning in practice.

  16. Implementing Kernel Methods Incrementally by Incremental Nonlinear Projection Trick.

    Science.gov (United States)

    Kwak, Nojun

    2016-05-20

    Recently, the nonlinear projection trick (NPT) was introduced enabling direct computation of coordinates of samples in a reproducing kernel Hilbert space. With NPT, any machine learning algorithm can be extended to a kernel version without relying on the so called kernel trick. However, NPT is inherently difficult to be implemented incrementally because an ever increasing kernel matrix should be treated as additional training samples are introduced. In this paper, an incremental version of the NPT (INPT) is proposed based on the observation that the centerization step in NPT is unnecessary. Because the proposed INPT does not change the coordinates of the old data, the coordinates obtained by INPT can directly be used in any incremental methods to implement a kernel version of the incremental methods. The effectiveness of the INPT is shown by applying it to implement incremental versions of kernel methods such as, kernel singular value decomposition, kernel principal component analysis, and kernel discriminant analysis which are utilized for problems of kernel matrix reconstruction, letter classification, and face image retrieval, respectively.

  17. Napping on the Night Shift: A Two-Hospital Implementation Project

    Science.gov (United States)

    Brown, Jeanne Geiger; Sagherian, Knar; Zhu, Shijun; Wieroniey, Margaret; Blair, Lori; Warren, Joan; Hinds, Pamela; Szeles, Rose

    2015-01-01

    Some nurses who work the night shift experience high levels of sleepiness. Napping has been adopted as an effective countermeasure to sleepiness and fatigue in other safety-sensitive industries but has not had widespread acceptance in nursing. In this two-hospital implementation project, napping was offered to six nursing units where nurse executives had previously approved nap implementation for the night shift as a pilot project. Successful implementation occurred in only one of the six units with partial success in a second unit. Barriers primarily occurred at the point of seeking unit-based nursing leadership approval. On the successful unit, one hundred fifty three 30-minutes naps were taken during the 3-month pilot period. A Nap Experience Survey measured sleepiness prior to the nap, the nap duration and perceived sleep, sleep inertia after the nap, and the perceived helpfulness of the nap. A high level of sleepiness was present at the beginning of 44% of naps. For over half of naps, nurses reported sleeping slightly (43%) or deeply (14%). Sleep inertia was rare (very groggy or sluggish on arising, 1.3%). The average score of helpfulness of napping was high (7.3 on a 1–10 scale). Nurses who napped reported being less drowsy while driving home after their shift. These data suggest that when barriers to napping are overcome, napping on the nightshift is feasible and can reduce sleepiness and drowsy driving in nurses. PMID:27082421

  18. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  19. PRELIMINARY PROJECT PLAN FOR LANSCE INTEGRATED FLIGHT PATHS 11A, 11B, 12, and 13

    International Nuclear Information System (INIS)

    Bultman, D. H.; Weinacht, D.

    2000-01-01

    This Preliminary Project Plan Summarizes the Technical, Cost, and Schedule baselines for an integrated approach to developing several flight paths at the Manual Lujan Jr. Neutron Scattering Center at the Los Alamos Neutron Science Center. For example, the cost estimate is intended to serve only as a rough order of magnitude assessment of the cost that might be incurred as the flight paths are developed. Further refinement of the requirements and interfaces for each beamline will permit additional refinement and confidence in the accuracy of all three baselines (Technical, Cost, Schedule)

  20. INTEGRATION OF ECONOMIC AND COMPUTER SKILLS AT IMPLEMENTATION OF STUDENTS PROJECT «BUSINESS PLAN PRODUCING IN MICROSOFT WORD»

    Directory of Open Access Journals (Sweden)

    Y.B. Samchinska

    2012-07-01

    Full Text Available In the article expedience at implementation of economic specialities by complex students project on Informatics and Computer Sciences is grounded on creation of business plan by modern information technologies, and also methodical recommendations are presented on implementation of this project.

  1. Between a rock and a hard place: Management and implementation teams’ expectations of project managers in an agile information systems delivery environment

    Directory of Open Access Journals (Sweden)

    Songezo Nkukwana

    2017-08-01

    Objectives: This case study investigated how project managers could adapt to agile IS implementation environments to remain relevant. Specifically, the views of their key stakeholders (the management and implementation teams were elicited to provide insights into what is expected from agile project managers. Method: A qualitative, inductive content analysis approach using purposive sampling was used to identify 13 participants (comprising management and implementation team members within a large South African insurance company. Semi-structured interviews were conducted with all participants. Results: The management and implementation teams agreed that PM remains highly relevant in an agile environment for ensuring project governance including delivery, risk management, reporting and budgeting. There was, however, disagreement between the management and implementation teams on project management interaction with the implementation team. Management preferred a command and control type project manager, while the implementation team favoured a more inclusive, facilitative PM style. Conclusion: To remain viable in an agile IS project implementation environment within large corporates, project managers need to be aware of what various stakeholders expect of them. They need to retain some of the classic PM functions while adapting to the interpersonal and collaborative requirements of the agile way.

  2. PROJECT IMPLEMENTATION OF LEAN MANUFACTURING: A STUDY IN AUTOMOTIVE SUPPLY CHAIN

    Directory of Open Access Journals (Sweden)

    Marodin, G. A.

    2015-06-01

    Full Text Available Despite the fact that lean production (LP is widely used by companies from a broad number of countries and sectors, to achieve a mature LP project implementation is still considered hard to accomplish and sustain. The fact that LP is highly context dependent is one of the major difficulties that hinder its implementation. The extant knowledge about LP implementation from emerging markets is still murky and substantially lower than from developed countries This paper emphasizes LP in Brazil, one of the emerging economies where there is relatively little knowledge about how companies are implementing LP. The existing literature of LP in this country is rare and focused mainly on case studies with a few selected companies. For that, a survey with 49 firms of the automotive supply chain of Brazil was carried out and data collected was analyzed by means of multivariate techniques.

  3. Small-scale hydro power in the Anniviers Valley. Project Ayer-Nava. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Ayer-Nava. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant near Ayer, a village in the Anniviers Valley (Swiss Alps). Water from the Nava, a steep mountain river, should be lead into a hydraulic scheme for power generation. A hydraulic head of 400 to 550 m is available, depending on the variant considered. The corresponding expected mechanical power is 0.9 to 1.1 MW. For the most promising variant a preliminary project is described (peak electric power: 0.91 MW, annual electrical energy production: 3.1 GWh). The local geology and hydrogeology are presented. The water collection points, conduits and the power station are described. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  4. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  5. MELCOR/CONTAIN LMR Implementation Report. FY14 Progress

    Energy Technology Data Exchange (ETDEWEB)

    Humphries, Larry L; Louie, David L.Y.

    2014-10-01

    This report describes the preliminary implementation of the sodium thermophysical properties and the design documentation for the sodium models of CONTAIN-LMR to be implemented into MELCOR 2.1. In the past year, the implementation included two separate sodium properties from two different sources. The first source is based on the previous work done by Idaho National Laboratory by modifying MELCOR to include liquid lithium equation of state as a working fluid to model the nuclear fusion safety research. To minimize the impact to MELCOR, the implementation of the fusion safety database (FSD) was done by utilizing the detection of the data input file as a way to invoking the FSD. The FSD methodology has been adapted currently for this work, but it may subject modification as the project continues. The second source uses properties generated for the SIMMER code. Preliminary testing and results from this implementation of sodium properties are given. In this year, the design document for the CONTAIN-LMR sodium models, such as the two condensable option, sodium spray fire, and sodium pool fire is being developed. This design document is intended to serve as a guide for the MELCOR implementation. In addition, CONTAIN-LMR code used was based on the earlier version of CONTAIN code. Many physical models that were developed since this early version of CONTAIN may not be captured by the code. Although CONTAIN 2, which represents the latest development of CONTAIN, contains some sodium specific models, which are not complete, the utilizing CONTAIN 2 with all sodium models implemented from CONTAIN-LMR as a comparison code for MELCOR should be done. This implementation should be completed in early next year, while sodium models from CONTAIN-LMR are being integrated into MELCOR. For testing, CONTAIN decks have been developed for verification and validation use.

  6. Waste-to-energy technologies and project implementation

    CERN Document Server

    Rogoff, Marc J

    2011-01-01

    This book covers in detail programs and technologies for converting traditionally landfilled solid wastes into energy through waste-to-energy projects. Modern Waste-to-Energy plants are being built around the world to reduce the levels of solid waste going into landfill sites and contribute to renewable energy and carbon reduction targets. The latest technologies have also reduced the pollution levels seen from early waste incineration plants by over 99 per cent. With case studies from around the world, Rogoff and Screve provide an insight into the different approaches taken to the planning and implementation of WTE. The second edition includes coverage of the latest technologies and practical engineering challenges as well as an exploration of the economic and regulatory context for the development of WTE.

  7. PRINCIPLES OF ASSESSING THE SOCIAL EFFECTS BY IMPLEMENTING INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Denis SIMOV

    2013-12-01

    Full Text Available Financial instruments are efficient – in terms of resource – mobilization of cohesion policy resources to achieve the objectives of the strategy. Rules of forming the investment strategy, particularly in State structures, by using the budget funds of the Republic of Moldova, must include as one of the criteria for project selection, the achieve of a positive social effect associated with its implementation.

  8. The MACHO Project: Preliminary Results from 4 years of SMC observations.

    Science.gov (United States)

    Vandehei, T.; Griest, K.; Lehner, M.; Alcock, C.; Alves, D.; Cook, K.; Marshall, S.; Minniti, D.; Allsman, R.; Axelrod, T.; Freeman, K.; Peterson, B.; Rodgers, A.; Pratt, M.; Becker, A.; Stubbs, C.; Tomaney, A.; Bennett, D.; Quinn, P.; Sutherland, W.; Welch, D.

    1997-12-01

    The MACHO project is a search for dark matter in the form of massive compact halo objects(MACHOs). The project has photometrically monitored tens of millions of stars in the Large Magellanic Cloud (LMC), Small Magellanic Cloud (SMC), and Galactic bulge in search of rare gravitational microlensing events caused by these otherwise invisible objects. Microlensing toward the LMC has allowed powerful statements to be made about the dark population in the halo of our Galaxy, indicating that the MACHO halo fraction could be as high as f=0.5 with a most probable MACHO mass being ~ 0.5Msun. However, to date the LMC has been the only line of sight out of our Galaxy's halo. Clearly, another line of sight would provide a consistency check on these results, as well as another contraint on models of the halo, in particular on halo flattening. The SMC affords us this second line of sight. Here we give a status report on our upcoming 4 year results toward the SMC. We present the results of a preliminary analysis on over 2.2 million stars from 3 square degrees and discuss the implications for the dark matter in the halo of our Galaxy. A detailed analysis of the microlensing candidates toward the SMC, with blending and parallax fits, will be shown. This work is dedicated to the memory of Alex Rodgers.

  9. Stress analysis of HLW containers. Preliminary ring test exercise Compas project

    International Nuclear Information System (INIS)

    1989-01-01

    This document describes the series of experiments and associated calculations performed as the Compas preliminary ring test exercise. A number of mild steel rings, representative of sections through HLW containers, some notched and pre-cracked, were tested in compression right up to and beyond their ultimate load. The Compas project partners independently modelled the behaviour of these rings using their finite element codes. Four different ring types were tested, and each test was repeated three times. For three of the ring types, the three test repetitions gave identical results. The fourth ring, which was not modelled by the partners, had a 4 mm thick layer of weld metal deposited on its surface. The three tests on this ring did not give identical results and suggested that the effect of welding methods should be addressed at a later stage of the project. Fracture was not found to be a significant cause of ring failure. The results of the ring tests were compared with the partners predictions, and additionally some time was spent assessing where the use of the codes could be improved. This exercise showed that the partners codes have the ability to produce results within acceptable limits. Most codes were unable to model stable crack growth. There were indications that some codes would not be able to cope with a significantly more complex three-dimensional analysis

  10. Requirement analysis of the safety-critical software implementation for the nuclear power plant

    International Nuclear Information System (INIS)

    Chang, Hoon Seon; Jung, Jae Cheon; Kim, Jae Hack; Nam, Sang Ku; Kim, Hang Bae

    2005-01-01

    The safety critical software shall be implemented under the strict regulation and standards along with hardware qualification. In general, the safety critical software has been implemented using functional block language (FBL) and structured language like C in the real project. Software design shall comply with such characteristics as; modularity, simplicity, minimizing the use of sub-routine, and excluding the interrupt logic. To meet these prerequisites, we used the computer-aided software engineering (CASE) tool to substantiate the requirements traceability matrix that were manually developed using Word processors or Spreadsheets. And the coding standard and manual have been developed to confirm the quality of software development process, such as; readability, consistency, and maintainability in compliance with NUREG/CR-6463. System level preliminary hazard analysis (PHA) is performed by analyzing preliminary safety analysis report (PSAR) and FMEA document. The modularity concept is effectively implemented for the overall module configurations and functions using RTP software development tool. The response time imposed on the basis of the deterministic structure of the safety-critical software was measured

  11. Lessons learned from decommissioning projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Salazar, M.

    1995-01-01

    This paper describes lessons learned over the last 20 years from 12 decommissioning projects at Los Alamos National Laboratory. These lessons relate both to overall program management and to management of specific projects during the planning and operations phases. The issues include waste management; the National Environmental Policy Act (NEPA); the Resource Conservation and Recovery Act (RCRA); the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); contracting; public involvement; client/customer interface; and funding. Key elements of our approach are to be proactive; follow the observation method; perform field activities concurrently; develop strategies to keep reportable incidents from delaying work; seek and use programs, methods, etc., in existence to shorten learning curves; network to help develop solutions; and avoid overstudying and overcharacterizing. This approach results in preliminary plans that require very little revision before implementation, reasonable costs and schedules, early acquisition of permits and NEPA documents, preliminary characterization reports, and contracting documents. Our track record is good -- the last four projects (uranium and plutonium-processing facility and three research reactors) have been on budget and on schedule

  12. Learning Word Subsumption Projections for the Russian Language

    Directory of Open Access Journals (Sweden)

    Ustalov Dmitry

    2016-01-01

    Full Text Available The semantic relations of hypernymy and hyponymy are widely used in various natural language processing tasks for modelling the subsumptions in common sense reasoning. Since the popularisation of the distributional semantics, a significant attention is paid to applying word embeddings for inducing the relations between words. In this paper, we show our preliminary results on adopting the projection learning technique for computing hypernyms from hyponyms using word embeddings. We also conduct a series of experiments on the Russian language and release the open source software for learning hyponym-hypernym projections using both CPUs and GPUs, implemented with the TensorFlow machine learning framework.

  13. Project management as a tool to implement the strategy, the realities and prospects of oil and gas enterprises in the Republic of Kazakhstan

    Directory of Open Access Journals (Sweden)

    Karim Medet Sapiuly

    2017-01-01

    Full Text Available Project leadership is an important part of organizations’ activities. Project management makes it possible to solve some business tasks more effectively than the means of traditional and operational management. Projects hold a key role in the implementation of the organization’s strategy. Using the project leadership approach yielded uniting the functional units of the organization in a whole single team to achieve the goals and indicators of the strategy. Employing of project management in commercial and government organizations gets common in the CIS countries, including Republic of Kazakhstan. It is revealed that the implementation of a strategic management system will make it possible to minimize the consequences of the economic crisis for the oil and gas producing companies of Kazakhstan. A specific feature of Kazakhstan’s oil and gas industry lays in management system based on a functional approach, insufficient level of strategic management system and project management implementation. It is established that there are significant prospects for the development of project management in the oil and gas industry of Kazakhstan. Adoption and optimization of project leadership at the enterprises of the oil and gas industry in Kazakhstan will lead to the appropriate implementation of a strategic management system. In this regard, following measures are suggested to implement by enterprises: development of unified industry standards for project leadership; design of a training system for managers and employees; implementation of the process approach in the company’s management system; design and implementation of a Project Management Office (PMO in the company; development of a fair and progressive employees incentive program based on key performance indicators (KPI; implementation of specialized software for project management. The fulfillment of the above suggestions will significantly improve efficiency of the project management system

  14. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  15. Opportunities for AFRA NC implementing Projects

    International Nuclear Information System (INIS)

    2017-01-01

    Some of the AFRA Objectives are to Establish common understanding that all networks operate under the AFRA framework as an African single intergovernmental body Align these networks with the common objectives of AFRA for strengthening activities and to define the modalities for collaboration within AFRA MSs. Some of the achievements in 2016 are: Under RAF/0/038 “Promoting Technical Cooperation among Developing Countries (TCDC) in Africa through Triangular Partnerships”, adequate support was provided to facilitate the implementation of several joint project proposals submitted by Member States in various fields of activity including NDT, Radiation processing, and Education and Training in nuclear science and technology. Under RAF0041: “Sharing Best Practices in Preventive Maintenance of Nuclear Equipment”, support was provided to Member States at the Seibersdorf Laboratory to improve the maintenance of medical and scientific instrumentation through capacity development for repair services, preventive maintenance, and cost recovery through income generated from the provision of services

  16. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  17. Solution and implementation of project ''Simulator of WWER-440 nuclear power plant''

    International Nuclear Information System (INIS)

    Koukal, V.

    1985-01-01

    The time data are given of the development and construction of the simulator of a WWER-440 nuclear power plant unit. The individual tasks are summed up which are related to the project implementation, and cooperating institutions and enterprises are listed. (J.C.)

  18. Russian energy efficiency projects: lessons learnt from Activities Implemented Jointly pilot phase

    International Nuclear Information System (INIS)

    Korppoo, Anna

    2005-01-01

    Russia needs to improve the efficiency of energy. Failure to do so will retard the economic recovery of the country, but the energy sector is lacking both domestic and foreign investments. JI projects could provide the underfinanced Russian energy sector with additional investments. AIJ pilot project experiences provide an overview of the potential difficulties for future JI projects. Institutional problems were the most important category. Most of these problems remain, and the lack of ratification of the Kyoto Protocol by Russia has formed a new very significant barrier. Implementation level problems caused some problems to AIJ projects, but they are likely to have less impact on the better prepared JI projects. The character of funding-related problems has changed: for AIJ projects the main problem was that emission reductions could not be credited, whereas future JI projects will experience more competition in the Kyoto market where the overall investment climate and the availability of local cofunding are more relevant. Therefore, the unfinished economic and energy sector reforms currently discourage JI investments. The project experiences so far have been dismal, and if Russian policy-makers cannot improve this performance, only few JI projects can be expected in the future

  19. Classroom Environment in the Implementation of an Innovative Curriculum Project in Science Education.

    Science.gov (United States)

    Suarez, Mercedes; Pias, Rosa; Membiela, Pedro; Dapia, Dolores

    1998-01-01

    Analyzes the perceptions of students, teachers, and external observers in order to study the influence of classroom environment on the implementation of an innovative project in science education. Contains 33 references. (DDR)

  20. Implementation of Agile project management in spent nuclear fuel characterization process

    International Nuclear Information System (INIS)

    Vinas Pena, P.

    2015-01-01

    Full text of publication follows. Spent nuclear fuel characterization (SNFC) is a complex process that covers different areas of analysis and whose final goal is to provide an accurate description of spent nuclear fuel (SNF) status for its future classification for storage and transport. The need to reduce the SNFC processing time maintaining the quality of the product has motivated ENUSA to research and implement Agile project management and human performance techniques. The Agile management techniques are focused in accommodate changes or new requirements in the project during the elaboration process without suffering delays or lose of quality. For its SNF projects ENUSA uses 2 complementary techniques: SCRUM and Kanban. SCRUM methodology is based on divide the process into activities blocks. Each block is a finished part of the final product which allows periodical deliveries of the product and the easy introduction of changes if they are necessary. The characterization process is formed by blocks of activities based on different analysis for every fuel assembly as the existence of leaking rods; the analysis of the structural integrity considering the existence of missing rods, broken or missing grids or grid straps or grid springs...; the corrosion phenomenon on the rod that could affect its integrity during the storage and transport; the burnup of the fuel assembly; the analysis of the rod internal pressure and its effect on rod failure mechanism as creep or on the material embrittlement due to the radial hydride precipitation; the compatibility with the container to avoid operational problems during cask loading and unloading, and any new input based on the regulatory evolution and the industry state of the art. The different analysis can be developed at the same time as they are independent. Kanban methodology consists in a visual representation of the evolution of the process. In a chart, the different activities needed to perform any of the analysis

  1. 32 CFR 644.30 - Preliminary real estate work.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Preliminary real estate work. 644.30 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Military (army and Air Force) and Other Federal Agencies § 644.30 Preliminary real estate work. (a) Preliminary real estate work is defined as that action taken...

  2. Implementation plan for the Operations Center Upgrade project

    International Nuclear Information System (INIS)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed

  3. Using the partial least squares (PLS) method to establish critical success factor interdependence in ERP implementation projects

    OpenAIRE

    Esteves, José; Pastor Collado, Juan Antonio; Casanovas Garcia, Josep

    2002-01-01

    This technical research report proposes the usage of a statistical approach named Partial Least squares (PLS) to define the relationships between critical success factors for ERP implementation projects. In previous research work, we developed a unified model of critical success factors for ERP implementation projects. Some researchers have evidenced the relationships between these critical success factors, however no one has defined in a form...

  4. Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-08-01

    Full Text Available The construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract The question is, was the optimum implementation accomplished? The provision for the success of the project is how are the daily activities managed by the three stakeholders of the project (contractor, owner, and consultant and their technical and practical capability to attain the balance of the project fundamental points (cost, time and quality taking into account the project objectives that were set by the owner. Despite the way, logical framework management and project’s major steps there is a group of elements which become major measures to determine the success or failure of the project, the research interested in these elements by a thorough study of references related to the success of a constructional project. To reinforce the theoretical study a field assessment of the housing project; this led to the recognition of the major elements that caused breaches of the evaluation criteria. The closed questionnaire and the regular forms based on the data and information collected through the theoretical review and the closed questionnaire to conclude and examine some concepts related by assessing the quality of building materials used in residential investment projects through the stages (planning - design-implementation Through the research a lot of deductions were made, the most important is that there cannot be an evaluation system

  5. The Critical Factors of Scrum Implementation in IT Project - the Case Study

    Directory of Open Access Journals (Sweden)

    Aneta Ozierańska

    2016-07-01

    Full Text Available The paper first presents basic information about the Scrum method. Then it summarizes the state of art in the domain of Scrum implementation, especially as far as the critical factors of its success are concerned. On the basis of literature survey a new model classifying Scrum implementation critical factors is proposed. The model divides Scrum implementation critical factors into five categories: Project Team factors, Psychological and cultural factors, Process and Method, Environment and Technology. The model is then developed and verified using the case study method. The research was carried out in a French IT company by means of a participating observation. The company was implementing Scrum, which ended up as a success. A journal of the Scrum implementation was conducted, presenting the experiences of the Scrum Team, their opinions and changes in the Scrum method which were introduced. On its basis critical factors, crucial for the success of Scrum implementation, classified according to the above mentioned model, were identified, completing those which had been found in the literaturę.

  6. Quality and Safety Assurance - Priority Task at Nuclear Power Projects Implementation

    International Nuclear Information System (INIS)

    Nenkova, B.; Manchev, B.; Tomov, E.

    2010-01-01

    Quality and safety assurance at implementation of nuclear power engineering projects is important and difficult task for realization. Many problems arise during this process, when many companies from different countries participate, with various kinds of activities and services provided. The scope of activities necessary for quality and safety assurance is therefore quite expanded and diverse. In order to increase the safety and reliability of Kozloduy NPP Plc (KNPP) Units 5 and 6, as well as to bring the units in conformity with the newest international requirements for quality and safety in the field of nuclear energy, a program for their modernization on the basis of different technical studies and assessments was implemented. The Units 5 and 6 Modernization Program of Kozloduy Nuclear Power Plant was composed of 212 modifications aimed to improve the safety, operability, and reliability of the Units. The Program was realized by stages during yearly planned outages since year 2002 to 2007, without additional outages. A major Program Objective was to extend the Units Life Time in at least 15 Years, under a continuous, safe, and reliable operation. The Modernization Program of Units 5 and 6 of the Bulgarian Nuclear Power Plant in Kozloduy was the first and for the time being the only one in the world, program in the field of nuclear power engineering, by which the full scope of recommendations for improvement of the Kozloduy NPP units was applied. The main goal of the National Electric Company, which is the Employer for the construction of new nuclear facility in Bulgaria, is after completion of all activities regarding construction of Belene NPP the plant to meet or exceed the requirements of the respective national and international quality and safety codes and standards, as well as the IAEA guidelines, as they are established. The objective of this report is to describe different aspects of the quality assurance according to the requirements of quality and

  7. Community Awareness on Rabies Prevention and Control in Bicol, Philippines: Pre- and Post-Project Implementation

    Directory of Open Access Journals (Sweden)

    Toni Rose M. Barroga

    2018-02-01

    Full Text Available Rabies is endemic in the Philippines. To support the rabies campaign in the Bicol region at the southeastern part of Luzon, the BAI-OIE Stop Transboundary Animal Diseases and Zoonoses (STANDZ Rabies project was implemented in the pilot provinces of Camarines Norte, Camarines Sur, Albay, and Masbate. A community awareness survey was conducted with the residents of these provinces to determine their knowledge, attitude, and practices (KAP on rabies during the start and end of the project. Qualitative, descriptive research was done with a structured KAP questionnaire. Pet owners in the pilot provinces were chosen as respondents. Results showed that respondents know that they can acquire rabies in animals through the bite of a rabid dog (pre-project implementation (PRI: 19.6%, post-project implementation (POI: 38.0%. Vaccination was the top rabies preventive measure (PRI: 61.8%, POI: 92.8%. Biting incidents were noted in some respondents, and observing the dog and killing it immediately were some of the actions taken by bite victims. If a supposed rabid dog was seen, respondents would either: immediately kill the dog (PRI: 20.3%, POI: 13.7%, report it to authorities (PRI: 26.3%, POI: 63.1%, and capture and observe the dog concerned (PRI: 13.5%, POI: 6.0%. Pet owners increased their KAP about rabies prevention and control as compared to the pre-implementation study. However, certain gaps in their KAP need to be given attention; thus continuous education of pet owners must be done.

  8. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  9. Implementing earth observation and advanced satellite based atmospheric sounders for water resource and climate modelling

    DEFF Research Database (Denmark)

    Boegh, E.; Dellwik, Ebba; Hahmann, Andrea N.

    2010-01-01

    This paper discusses preliminary remote sensing (MODIS) based hydrological modelling results for the Danish island Sjælland (7330 km2) in relation to project objectives and methodologies of a new research projectImplementing Earth observation and advanced satellite based atmospheric sounders....... For this purpose, a) internal catchment processes will be studied using a Distributed Temperature Sensing (DTS) system, b) Earth observations will be used to upscale from field to regional scales, and c) at the largest scale, satellite based atmospheric sounders and meso-scale climate modelling will be used...

  10. Implementation of visitor pattern in processing a syntax tree in Qlab project

    Directory of Open Access Journals (Sweden)

    Đenić Aleksandar

    2012-01-01

    Full Text Available Qlab is an open-source project that supports various mathematical calculations, specialized for academic use. It has been developed at the Faculty of Mathematics, University of Belgrade, and is supported by Microsoft Serbia. In this paper we present some of Qlab’s successfully implemented core solutions. More precisely, in our approach we use a specialized Visitor pattern to optimize the management of syntax tree commands that our parser sends to our engine. This allows the processing of a larger scale of tree implementation using the Visitor interface.

  11. Management of radiodiagnostic equipment: Implementation of self-maintenance project of the conventional x-ray equipment of Hospital Universitario Clementino Fraga Filho - HUCFF-UFRJ

    International Nuclear Information System (INIS)

    Couto, N.F. do; Azevedo, A.C.P.; Koch, H.A.

    2001-01-01

    The project aims the implantation of a management program, for the maintenance of the conventional X-ray equipment at HUCFF. It has been implemented through the training of the electronic technicians who work at the Hospital. Essential courses were organized such as: Basics of Radioprotection, Radiographs Techniques, and Maintenance of equipment of X-Rays. Equipment: a library with the schemes of the equipment is being assembled in collaboration with UNICAMP. In order to manage the process, a software was created using the tools of the total quality for control of the maintenance. Preliminary tests: the equipment and their working conditions were evaluated, as well as the level of the employees' satisfaction with their use. The creation of a new routine for maintenance seeks to assist the demands of the new legislation in Brazil 5, and also reduce the costs to improve the quality of the images in the Radiodiagnostic Service. (author)

  12. ON THE QUESTION OF CORPORATE FUNDING IMPLEMENTATION OF EXPLORATION AND PRODUCTION INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Voronin D. M.

    2016-03-01

    Full Text Available As part of the research, the content of the required theoretical and methodological tools in the field of corporate finance investment projects of exploration and production of hydrocarbons described. Indicated cash flow characteristics of such projects in accordance with the phases of the project, identified the risks associated with cash flows. In practical terms, the proposed approach to the financing of projects includes sequential algorithm deciding on the implementation of funding is considered on case studies and can be used in the process of financial planning oil and gas companies, in building policy project financing, corporate procedures and regulations. In solving problems of theoretical and applied scientific methods used in the study, including methods of logical, comparative and systematic analysis, as well as methods of economic-mathematical modeling.

  13. Sharing and reusing cardiovascular anatomical models over the Web: a step towards the implementation of the virtual physiological human project.

    Science.gov (United States)

    Gianni, Daniele; McKeever, Steve; Yu, Tommy; Britten, Randall; Delingette, Hervé; Frangi, Alejandro; Hunter, Peter; Smith, Nicolas

    2010-06-28

    Sharing and reusing anatomical models over the Web offers a significant opportunity to progress the investigation of cardiovascular diseases. However, the current sharing methodology suffers from the limitations of static model delivery (i.e. embedding static links to the models within Web pages) and of a disaggregated view of the model metadata produced by publications and cardiac simulations in isolation. In the context of euHeart--a research project targeting the description and representation of cardiovascular models for disease diagnosis and treatment purposes--we aim to overcome the above limitations with the introduction of euHeartDB, a Web-enabled database for anatomical models of the heart. The database implements a dynamic sharing methodology by managing data access and by tracing all applications. In addition to this, euHeartDB establishes a knowledge link with the physiome model repository by linking geometries to CellML models embedded in the simulation of cardiac behaviour. Furthermore, euHeartDB uses the exFormat--a preliminary version of the interoperable FieldML data format--to effectively promote reuse of anatomical models, and currently incorporates Continuum Mechanics, Image Analysis, Signal Processing and System Identification Graphical User Interface (CMGUI), a rendering engine, to provide three-dimensional graphical views of the models populating the database. Currently, euHeartDB stores 11 cardiac geometries developed within the euHeart project consortium.

  14. The Arnot capacity increase project - An integrated boiler and turbine retrofit by Alstom - Implementation and operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Davies, Mike; Stephen, Don; Rich, Glyn; Mills, Jeff; Allen, Steve

    2010-09-15

    In cooperation with South African utility giant Eskom, Alstom has undertaken an ambitious project to upgrade the six-unit Arnot Power Station. The objective was to retrofit major plant components in a cost effective manner in order to extend plant life and increase output. This paper will consider the implementation of the project, the challenges overcome and the operational experience subsequently gained. Lessons learned will be identified. Conclusions will be drawn concerning the effectiveness of a comprehensive feasibility study prior to project implementation and the ability of modern design and manufacturing techniques to retrofit older machines, thus releasing latent potential.

  15. Economic Efficiency and Investment Implementation in Energy Saving Projects

    Directory of Open Access Journals (Sweden)

    Venelin Terziev

    2017-09-01

    Full Text Available Investment in building thermoinsulation is a subject to appraisal for efficiency from the position of discounted cash flows taken specifically by energy saving. The appraisal of investment as optimal is attended by achieving the shortest term for investment implementation, the lowest investment outlays, the maximum total net value of energy savings, the shortest investment payback period. The complex application of the dynamic methods for appraising economic efficiency of an investment – net present value, internal rate of return, profitability index and discounted payback period, involves drawing of particular values which comparison definitely will show if this kind of investment is practically “attractive”. However, the question for significance weight of each of these indicators above in decision making for implementation a particular real investment still remains unsolved. This requires working out a system of criteria, priorities that can determine which of the indicators for economic efficiency of specific investment project will have the highest significance.

  16. Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

    Energy Technology Data Exchange (ETDEWEB)

    Wilcox, Brian; Mellor, Russ; Michaluk, Craig [Atomic Energy of Canada Limited, Whiteshell Laboratories, Pinawa, Manitoba (Canada)

    2013-07-01

    Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysics and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits

  17. Economics of forests and REDD+ projects: Translating lessons learned into national REDD+ implementation

    Energy Technology Data Exchange (ETDEWEB)

    Zaballa Romero, M.; Traerup, S.; Wieben, E.; Ravnkilde Moeller, L.; Koch, A.

    2012-11-15

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. (Author)

  18. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  19. From Project Management Capabilities to ERP Implementation Success: The Mediating Effect of IT Executives' Capabilities

    Science.gov (United States)

    Touir, Maatallah

    2016-01-01

    Enterprise resource planning project implementation success is necessary for organizations to enhance productivity and achieve operational efficiency; however, the failure rates of ERP projects remain high, ranging between 10% and 90%, and costing organizations $500,000 to $300 million. The problem addressed in this study was the low success rate…

  20. A National Implementation Project to Prevent Catheter-Associated Urinary Tract Infection in Nursing Home Residents.

    Science.gov (United States)

    Mody, Lona; Greene, M Todd; Meddings, Jennifer; Krein, Sarah L; McNamara, Sara E; Trautner, Barbara W; Ratz, David; Stone, Nimalie D; Min, Lillian; Schweon, Steven J; Rolle, Andrew J; Olmsted, Russell N; Burwen, Dale R; Battles, James; Edson, Barbara; Saint, Sanjay

    2017-08-01

    Catheter-associated urinary tract infection (UTI) in nursing home residents is a common cause of sepsis, hospital admission, and antimicrobial use leading to colonization with multidrug-resistant organisms. To develop, implement, and evaluate an intervention to reduce catheter-associated UTI. A large-scale prospective implementation project was conducted in community-based nursing homes participating in the Agency for Healthcare Research and Quality Safety Program for Long-Term Care. Nursing homes across 48 states, Washington DC, and Puerto Rico participated. Implementation of the project was conducted between March 1, 2014, and August 31, 2016. The project was implemented over 12-month cohorts and included a technical bundle: catheter removal, aseptic insertion, using regular assessments, training for catheter care, and incontinence care planning, as well as a socioadaptive bundle emphasizing leadership, resident and family engagement, and effective communication. Urinary catheter use and catheter-associated UTI rates using National Healthcare Safety Network definitions were collected. Facility-level urine culture order rates were also obtained. Random-effects negative binomial regression models were used to examine changes in catheter-associated UTI, catheter utilization, and urine cultures and adjusted for covariates including ownership, bed size, provision of subacute care, 5-star rating, presence of an infection control committee, and an infection preventionist. In 4 cohorts over 30 months, 568 community-based nursing homes were recruited; 404 met inclusion criteria for analysis. The unadjusted catheter-associated UTI rates decreased from 6.78 to 2.63 infections per 1000 catheter-days. With use of the regression model and adjustment for facility characteristics, the rates decreased from 6.42 to 3.33 (incidence rate ratio [IRR], 0.46; 95% CI, 0.36-0.58; P project. Catheter utilization remained unchanged (4.50 at baseline, 4.45 at conclusion of project; IRR, 0

  1. Implementation of a change management solution based on a product lifecycle management system for a large international project

    International Nuclear Information System (INIS)

    Luehr, Anneke

    2011-08-01

    This Thesis describes the implementation of a Change Management solution based on a Product Lifecycle Management System (PLM System) for a large international project. The objective of Change Management is to ensure a systematic line of action for approving and implementing changes in the project. The Deutsches Elektronen-Synchrotron DESY is one of the world's leading accelerator centres with locations in Hamburg and Zeuthen. Currently, DESY participates in the realization of the international research facility European X-Ray Free-Electron Laser (XFEL) at the Hamburg site. DESY was responsible for the planning of the XFEL. When the project entered the construction phase it was internationalized and now comprises project groups in 12 countries. Thus the requirements on Change Management have changed, as participants from several labs at many different locations are now involved. First the project scope is described and then a target process for the Change Management solution is developed by a requirement analysis. Afterwards the technical implementation of this process in DESY's PLM System is described and the Change Management solution is tested. The process is visualized using the Unified Modeling Language (UML). Finally a description is given of how to transfer the solution to the project

  2. Inclusive design in the implementation of projects for schools modernization in Portugal - case studies.

    Science.gov (United States)

    Lopes, Lígia; Aguiar, Carlos; da Silva, Fernando Moreira

    2012-01-01

    The Project for Schools Modernization taking place in Portugal, with an estimated total investment of 2450 million for the intervention in the first 205 schools, provide the reclassification of 332 secondary schools by 2015. One of the questions we can pose is if the authorities and the teams of architects selected to design these schools considered fundamental for the correctness of architectural barriers within the school and its accessibility the implementation of standards and principles of inclusion of children/teenagers with special needs within their school environment. As most of the projects are already being implemented, the main aim of this paper is to present the outcomes of a comparative analysis and synthesis of six schools located in the northern part of the country. This analysis occurs from the of Participatory Design perspective which appeals to the experience of the disable children to look (or evaluate) the negative and positive factors in terms of physical space, interpreted by inclusive design rules and orientations. Therefore, the evaluation of schools modernization project, and its discussion, is central for the understanding how these children are addressed in projects which are directed at them.

  3. Implementing the "Marketing You" Project in Large Sections of Principles of Marketing

    Science.gov (United States)

    Smith, Karen H.

    2004-01-01

    There is mounting pressure on business education to increase experiential learning at the same time that budget constraints are forcing universities to increase class size. This article explains the design and implementation of the "Marketing You" project in two large sections of Principles of Marketing to bring experiential learning into the…

  4. Implementing service improvement projects within pre-registration nursing education: a multi-method case study evaluation.

    Science.gov (United States)

    Baillie, Lesley; Bromley, Barbara; Walker, Moira; Jones, Rebecca; Mhlanga, Fortune

    2014-01-01

    Preparing healthcare students for quality and service improvement is important internationally. A United Kingdom (UK) initiative aims to embed service improvement in pre-registration education. A UK university implemented service improvement teaching for all nursing students. In addition, the degree pathway students conducted service improvement projects as the basis for their dissertations. The study aimed to evaluate the implementation of service improvement projects within a pre-registration nursing curriculum. A multi-method case study was conducted, using student questionnaires, focus groups with students and academic staff, and observation of action learning sets. Questionnaire data were analysed using SPSS v19. Qualitative data were analysed using Ritchie and Spencer's (1994) Framework Approach. Students were very positive about service improvement. The degree students, who conducted service improvement projects in practice, felt more knowledgeable than advanced diploma students. Selecting the project focus was a key issue and students encountered some challenges in practice. Support for student service improvement projects came from action learning sets, placement staff, and academic staff. Service improvement projects had a positive effect on students' learning. An effective partnership between the university and partner healthcare organisations, and support for students in practice, is essential. Copyright © 2013 Elsevier Ltd. All rights reserved.

  5. Producing satisfactory outcomes in the implementation phase of PPP infrastructure projects: A fuzzy set qualitative comparative analysis of 27 road constructions in the Netherlands

    NARCIS (Netherlands)

    S. Verweij (Stefan)

    2015-01-01

    textabstractAn understudied aspect for the successful completion of PPP infrastructure projects is the extent to which they are satisfactorily implemented. Studying PPP implementation is important though, because well-planned projects can fail if project implementation is inadequately managed. This

  6. Advanced Engineering Environment FY09/10 pilot project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.; Dutra, Edward G.; Sego, Abraham L.

    2010-06-01

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporate product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.

  7. Development and implementation of the regulatory control of sources in Latin American Model Project countries

    International Nuclear Information System (INIS)

    Ferruz Cruz, P.

    2001-01-01

    After a general assessment of the situation regarding radiation safety and the radiation protection infrastructure in Latin American countries, several of them were invited to participate in a Model Project oriented, in some cases, towards establishing a mechanism for national regulatory control of radiation sources, and in others, towards upgrading their national control programme. All these activities aimed at reaching an effective and sustainable radiation protection infrastructure based on international basic safety standards. The paper presents a general overview of the current situation with regard to radiation protection within the Model Project countries in Latin America after almost five years of activities. It includes: the implementation of regulatory issues; the control of occupational, medical and public exposures; emergency response and waste safety issues. The paper also presents some lessons learned during implementation concerning the numerous activities involved in this interregional project. (author)

  8. Savannah River Plant Low-Level Waste Heat Utilization Project preliminary analysis. Volume III. Preferred utilization options

    International Nuclear Information System (INIS)

    1978-11-01

    The technical, economic, environmental, and institutional considerations that must be resolved before implementing options to recover energy from the heated SRP effluent are examined. Detailed hypothetical siting options and expected economic returns are examined for power generation, prawn production, and one industrial park scenario. The likely indirect effects on regional population, income, taxes, and infrastructure requirements if the industrial park scenario is implemented are also projected. Recommendations for follow-on studies to make possible an informed go/no-go decision for implementing attractive waste heat options using reject SRP effluent are included

  9. The Preliminary Decommissioning Plan of the Dalat Nuclear Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lam, Pham Van; Vien, Luong Ba; Vinh, Le Vinh; Nghiem, Huynh Ton; Tuan, Nguyen Minh; Phuong, Pham Hoai [Nuclear Research Institute, Da Lat (Viet Nam)

    2013-08-15

    Recently, after 25 years of operation, a preliminary decommissioning plan for the Dalat Nuclear Research Reactor (DNRR) has been produced but as yet it has not been implemented due to the continued operations of the reactor. However, from the early phases of facility design and construction and during operation, the aspects that facilitate decommissioning process have been considered. This paper outlines the DNRR general description, the organization that manages the facility, the decommissioning strategy and associated project management, and the expected decommissioning activities. The paper also considers associated cost and funding, safety and environmental issues and waste management aspects amongst other considerations associated with decommissioning a nuclear research reactor. (author)

  10. Implementing local projects to reduce the stigma of mental illness.

    Science.gov (United States)

    Warner, Richard

    2008-01-01

    This editorial describes strategies used and the lessons learned in implementing two local anti-stigma projects. The WPA Programme to Reduce Stigma and Discrimination Because of Schizophrenia established projects to fight stigma in 20 countries, using social-marketing techniques to enhance their effectiveness. First steps at each site were to establish an action committee and conduct a survey of perceived stigma. Based on survey results, the action committees selected a few homogeneous and accessible target groups, such as employers, and criminal justice personnel. Messages and media were selected, tested, and refined. Guidelines are provided for setting up a consumer (service-user) speakers' bureau and for establishing a media-watch organization, which can lobby news and entertainment media to exclude negative portrayals of people with mental illness. Improvements in knowledge about mental illness were effected in high school students and criminal justice personnel. Positive changes in attitude towards people with mental illness were achieved with high school students, but were more difficult to achieve with police officers. Local antistigma projects can be effective in reducing stigma and relatively inexpensive. The involvement of consumers is important in working with police officers. Project organizers should be on the lookout for useful changes that can become permanent.

  11. A First Implementation of a Design Thinking Workshop During a Mobile App Development Project Course

    OpenAIRE

    Pham, Yen Dieu; Fucci, Davide; Maalej, Walid

    2018-01-01

    Due to their characteristics, millennials prefer learning-by-doing and social learning, such as project-based learning. However, software development projects require not only technical skills but also creativity; Design Thinking can serve such purpose. We conducted a workshop following the Design Thinking approach of the d.school, to help students generating ideas for a mobile app development project course. On top of the details for implementing the workshop, we report our observations, les...

  12. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  13. Institutional repository in communication: the REPOSCOM project implemented in the digital libraries federation of communication science

    Directory of Open Access Journals (Sweden)

    Sueli Mara Soares Pinto Ferreira

    2007-01-01

    Full Text Available Considering the conceptualization, characterization and context of the institutional repositories (IR this paper discuss the procedures, policies and strategies delineated to the implementation of IR in a research environment. The object of discussion is the project called Reposcom - Institutional Repository of Intercom (Brazilian Society of Interdisciplinary Studies of Communication – which is part of a broader project managed by the Portcom – Information Network in Communication Sciences of Countries of Portuguese Language – and called Digital Libraries Federation in the Communication Sciences. Aiming to share the knowledge and experience acquired with the implementation of the Reposcom, this paper describes its work activities, the decisions made, the customization of the software DSpace (the technological solution and the initial results achieved with the project.

  14. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    OpenAIRE

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  15. Preliminary identification of problem soils for infrastructure projects

    CSIR Research Space (South Africa)

    Paige-Green, P

    2008-11-01

    Full Text Available soils are those within the top 1.0m or 1.5m of the soil profile, a mechanism for evaluating these materials without preliminary filed work and testing would be invaluable. Since 1971, the Department of Agriculture has systematically mapped the soils...

  16. Influence of Intelletual Stimulation and Conflict Resolution on Project Implementation: A case of Constituency Development Fund Construction Projects in Public Secondary Schools in Kisumu County, Kenya

    Directory of Open Access Journals (Sweden)

    Janet Wagude

    2015-11-01

    Full Text Available Intellectual stimulation is one of the manifestations of transformational leadership. Intellectual stimulation is the aspect of leadership where the leader encourages teams’ ingenuity, creativity and innovative thinking, urging them to keenly question the status quo in order to make discoveries. The purpose of this study was to explore the Influence of intellectual stimulation and conflict resolution on projects implementation. The objective was to determine the Influence of intellectual stimulation and conflict resolution on projects implementation. The study used Expost facto design. Multifactor leadership Questionnaire, Thomas Kilman Instruments, Interview, and documentary analysis were used as tools for data collection. The probability sampling used was stratified and simple random sampling technique. Data was analyzed both quantitatively and qualitatively. Multiple linear regression analysis was used as tool of analysis to test for significance in the hypothesis. One hypothesis was formulated and subsequently tested in the study in order to establish the influence of conflict resolution thereof, in hypothesis H1,( H0: The strength of the relationship between intellectual stimulation and implementation of CDF construction projects does not depend on conflict resolution., it was concluded that the strength of the relationship between intellectual stimulation and implementation of CDF construction projects depends on conflict resolution(P=0.001˂P=0.05,using multiple linear regression analysis the following results were obtained- F value of 7.788,d.f (2,59 and (P-value 0.00˂P= 0.05 significance level which was statistically significant. It was therefore concluded that there is a regression relationship between intellectual stimulation with conflict resolution and implementation of CDF projects. It is therefore recommended that accredited MLQ coaching is desirable, coaching from the systems’ psychodynamic stance could equip the leader in

  17. Optimisation of small-scale hydropower using quality assurance methods - Preliminary project; Vorprojekt: Optimierung von Kleinwasserkraftwerken durch Qualitaetssicherung. Programm Kleinwasserkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Hofer, S.; Staubli, T.

    2006-11-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary project that examined how quality assurance methods can be used in the optimisation of small-scale hydropower projects. The aim of the project, to use existing know-how, experience and synergies, is examined. Discrepancies in quality and their effects on production prices were determined in interviews. The paper describes best-practice guidelines for the quality assurance of small-scale hydro schemes. A flow chart describes the various steps that have to be taken in the project and realisation work. Information collected from planners and from interviews made with them are presented along with further information obtained from literature. The results of interviews concerning planning work, putting to tender and the construction stages of these hydro schemes are presented and commented on. Similarly, the operational phase of such power plant is also examined, including questions on operation and guarantees. The aims of the follow-up main project - the definition of a tool and guidelines for ensuring quality - are briefly reviewed.

  18. Implementing an interprofessional patient safety learning initiative: insights from participants, project leads and steering committee members.

    Science.gov (United States)

    Jeffs, Lianne; Abramovich, Ilona Alex; Hayes, Chris; Smith, Orla; Tregunno, Deborah; Chan, Wai-Hin; Reeves, Scott

    2013-11-01

    Effective teamwork and interprofessional collaboration are vital for healthcare quality and safety; however, challenges persist in creating interprofessional teamwork and resilient professional teams. A study was undertaken to delineate perceptions of individuals involved with the implementation of an interprofessional patient safety competency-based intervention and intervention participants. The study employed a qualitative study design that triangulated data from interviews with six steering committee members and five members of the project team who developed and monitored the intervention and six focus groups with clinical team members who participated in the intervention and implemented local patient safety projects within a large teaching hospital in Canada. Our study findings reveal that healthcare professionals and support staff acquired patient safety competencies in an interprofessional context that can result in improved patient and work flow processes. However, key challenges exist including managing projects amidst competing priorities, lacking physician engagement and sustaining projects. Our findings point to leaders to provide opportunities for healthcare teams to engage in interprofessional teamwork and patient safety projects to improve quality of patient care. Further research efforts should examine the sustainability of interprofessional safety projects and how leaders can more fully engage the participation of all professions, specifically physicians.

  19. Improving Science Attitude and Creative Thinking through Science Education Project: A Design, Implementation and Assessment

    Science.gov (United States)

    Sener, Nilay; Türk, Cumhur; Tas, Erol

    2015-01-01

    The purpose of this study is to examine the effects of a science education project implemented in different learning environments on secondary school students' creative thinking skills and their attitudes to science lesson. Within this scope, a total of 50 students who participated in the nature education project in Samsun City in 2014 make up the…

  20. The Formation of the Model of Diagnosing the Results Implementation of of Consulting Projects for Enterprises

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-11-01

    Full Text Available In the article the graphic-analytical model of diagnostics of results of implementation of consulting projects is formed, which allows to: take into consideration interests of participants to the project on choice of methods and methodologies of diagnosing; allocate alternative sets of business indicators for each object of impact in terms of consulting project; establish economic and non-economic criteria for evaluating the effectiveness of consulting, as well as monitoring of indicators and automated processing of diagnostic results to control deviations from the optimal values of the diagnosed project results. A structural-logical model of formation of alternative sets of indicators and choice of indicators for diagnostics of results of consulting projects has been developed. The elements of the enterprise management system have been codified to harmonize the corresponding indicators with their subsequent combination within the proposed sets. The control system objects and their elements have been allocated. The groups of indicators according to the technology of Balanced Score Card (BSC have been presented. The prospect of further research is the economic assessment of implementation of the diagnosed consulting projects, which will reveal the links between the parameters of production-economic activity and the assessment of projects, and allows choose the most significant ones.

  1. A preliminary examination of audience-related communications issues for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.

    1991-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation doses people may have received from exposure to radioactive materials released during past operations at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. The HEDR Project was initiated in response to public concerns about possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to effectively communicate to the many different concerned audiences. Accordingly, the TSP directed PNL to examine methods for communicating causes and effects of uncertainties in the dose estimates. After considering the directive and discussing it with the Communications Subcommittee of the TSP, PNL undertook a broad investigation of communications methods to consider for inclusion in the TSP's current communications program. As part of this investigation, a literature review was conducted regarding risk communications. A key finding was that, in order to successfully communicate risk-related information, a thorough understanding of the knowledge level, concerns and information needs of the intended recipients (i.e., the audience) is necessary. Hence, a preliminary audience analysis was conducted as part of the present research. This report summarizes the results of this analysis. 1 ref., 9 tabs.

  2. Economics of forest and forest carbon projects. Translating lessons learned into national REDD+ implementation

    DEFF Research Database (Denmark)

    Zaballa Romero, Mauricio Ernesto; Trærup, Sara Lærke Meltofte; Wieben, Emilie

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource...... but also the testing of advanced market commitments as a finance option for sustainable forest management. The findings in the report underline the fact that only through sound and transparent financial information will forest projects and national forest initiatives become interesting for private...... needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. The report is part of efforts to share financial experiences...

  3. Pickering safeguards: a preliminary analysis

    International Nuclear Information System (INIS)

    Todd, J.L.; Hodgkinson, J.G.

    1977-05-01

    A summary is presented of thoughts relative to a systems approach for implementing international safeguards. Included is a preliminary analysis of the Pickering Generating Station followed by a suggested safeguards system for the facility

  4. Exploring the Effects of Technology Overload on the Outcomes of Enterprise Resource Planning (ERP) Implementation Projects

    Science.gov (United States)

    Kates, Earl B.

    2016-01-01

    Despite significant investments made by organizations to implement ERP systems and prior research that explored contributing factors of ERP failure, the ERP implementation success rate continues to remain low in practice. Increased technology usage in the workplace coupled with higher dependency on technology to complete project tasks often leads…

  5. Cell emulation and preliminary results.

    Science.gov (United States)

    2016-07-01

    This report details preliminary results of the testing plan implemented by the Hawaii Natural Energy Institute to evaluate Electric Vehicle (EV) battery durability and reliability under electric utility grid operations. Commercial EV battery cells ar...

  6. Evidence utilisation project: Management of inadvertent perioperative hypothermia. The challenges of implementing best practice recommendations in the perioperative environment.

    Science.gov (United States)

    Munday, Judy; Hines, Sonia Jane; Chang, Anne M

    2013-12-01

    The prevention of inadvertent perioperative hypothermia (IPH) remains an important issue in perioperative healthcare. The aims of this project were to: (i) assess current clinical practice in the management of IPH and (ii) promote best practice in the management of IPH in adult operating theatres. This project from August 2010 to March 2012 utilised a system of audit and feedback to implement best practice recommendations. Data were collected via chart audits against criteria developed from best practice recommendations for managing IPH. Evidence-based best practices, such as consistent temperature monitoring and patient warming, were implemented using multifaceted interventions. Perioperative records for 73 patients (baseline) and 72 patients (post-implementation) were audited. Post-implementation audit showed an increase in patients with temperatures >36°C admitted to the post-anaesthetic care unit (PACU) (8%) and discharged from PACU (28%). The percentage of patients receiving preoperative temperature monitoring increased (38%); however, low levels of intraoperative monitoring remained (31% of patients with surgery of 30 min or longer duration). Small increases were found in patient warming of 5% intraoperatively and 8% postoperatively. Preoperative warming was not successfully implemented during this phase of the project. Temperature monitoring, warming and rates of normothermia improved; however, barriers to best practice of IPH management were experienced, which negatively impacted on the project. Further stages of implementation and audit were added to further address IPH management in this department. © 2013 The Authors. International Journal of Evidence-Based Healthcare © 2013 The Joanna Briggs Institute.

  7. Evaluation of the Parent-Implemented Communication Strategies (PiCS) Project Using the Multiattribute Utility (MAU) Approach

    Science.gov (United States)

    Stoner, Julia B.; Meadan, Hedda; Angell, Maureen E.; Daczewitz, Marcus

    2012-01-01

    We conducted a multiattribute utility (MAU) evaluation to assess the Parent-Implemented Communication Strategies (PiCS) project which was funded by the Institute of Education Sciences (IES). In the PiCS project parents of young children with developmental disabilities are trained and coached in their homes on naturalistic and visual teaching…

  8. DIFFICULTIES ENCOUNTERED IN ISO 9001:2008 IMPLEMENTATION PROJECTS IN INCUBATED TECHNOLOGY-BASED COMPANIES

    Directory of Open Access Journals (Sweden)

    Eduardo Gome Salgado

    2014-09-01

    Full Text Available Quality Management Systems (QMS are designed to continuously improve the performance of organizations aiming to constantly improve their services seeking to overcome their results. Thus, for the services and/or products offered to transmit confidence and credibility, they should be designed within appropriate norms and standards. This research aims to assess the difficulties encountered by the incubated companies participating in the PRIME-FINEP project and developing projects for certification of their QMS in accordance with ISO 9001:2008. An exploratory survey was performed in nine incubated technology-based companies (TBC, through a questionnaire with 21 questions totaling the opinion of 20 respondents. After analyzing the data it is concluded, with statistical meaning, that the TBC's with little incubation time present difficulties in implementing the quality policy (5.3, difficulty not identified in other studies conducted in large companies. However difficulties similar to those of the large companies are present in the incubated TBC, and are the following: documentation requirements (4.2 present in all incubated companies (regardless of incubation time, and design and development (7.3 present in companies with little incubation time. The difficulty in implementing the quality policy (5.3 is reflected in the achievement of the QMS certification project in accordance with ISO 9001:2008.

  9. 77 FR 74845 - AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit

    Science.gov (United States)

    2012-12-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14115-001] AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit Take notice that AJT Mining Properties, Inc., permittee for the proposed Yeldagalga Creek Hydroelectric Project, has requested that its preliminary permit...

  10. Examining Success Factors Related to ERP Implementations in Higher Education Shared Services Projects

    Science.gov (United States)

    Stoyanoff, Dawn Galadriel Pfeiffer

    2012-01-01

    This study examined the enterprise resource planning (ERP) implementations that utilized a shared services model in higher education. The purpose of this research was to examine the critical success factors which were perceived to contribute to project success. This research employed a quantitative non-experimental correlational design and the…

  11. Preliminary report on the Northern California Power Agency's Notice of Intention to seek certification for NCPA Geothermal Project No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    This preliminary report on the Northern California Power Agency (NCPA) geothermal power plant proposal has been prepared pursuant to California Public Resources Code Sections 25510, 25512, and 25540. It presents the preliminary Findings of fact and Conclusions adopted by the Commission Committee assigned to conduct proceedings on the Notice. In addition, the report contains a description of the proposed project, a summary of the proceedings to date, and local, state, and Federal government agency comments on the proposal. Finally, the report presents the Committee's view of those issues that require further consideration in future proceedings on the Notice. Pursuant to Public Resources Code Sections 25512 and 25540, the report presents preliminary Findings and Conclusions on: (1) conformity to the forecast of statewide and service area electric power demands; (2) the degree to which the proposed site and facility conform with applicable local, regional, state and Federal standards, ordinances, and laws; and (3) the safety and reliability of the facility.

  12. Implementation of project Safe in Amber. Verification study for SFR 1 SAR-08

    Energy Technology Data Exchange (ETDEWEB)

    Thomson, Gavin; Herben, Martin; Lloyd, Pam; Rose, Danny; Smith, Chris; Barraclough, Ian (Enviros Consulting Ltd (GB))

    2008-03-15

    This report documents an exercise in which AMBER has been used to represent the models used in Project SAFE, a safety assessment undertaken on SFR 1. (AMBER is a flexible, graphical-user-interface based tool that allows users to build their own dynamic compartmental models to represent the migration, degradation and fate of contaminants in an environmental system. AMBER allows the user to assess routine, accidental and long-term contaminant release.) AMBER has been used to undertake assessment calculations on all of the disposal system, including all disposal tunnels and the Silo, the geosphere and several biosphere modules. The near-field conceptual models were implemented with minimal changes to the approach undertaken previously in Project SAFE. Model complexity varied significantly between individual disposal facilities increasing significantly from the BLA to the BTF and BMA tunnels and Silo. Radionuclide transport through the fractured granite geosphere was approximated using a compartment model approach in AMBER. Several biosphere models were implemented in AMBER including reasonable biosphere development, which considered the evolution of the Forsmark area from coastal to lacustrine to agricultural environments in response to land uplift. Parameters were sampled from distributions and simulations were run for 1,000 realisations. In undertaking the comparison of AMBER with the various codes and calculation tools used in Project SAFE it was necessary to undertake a detailed analysis of the modelling approach previously adopted, with particular focus given to the near-field models. As a result some discrepancies in the implementation of the models and documentation were noted. The exercise demonstrates that AMBER is fully capable of representing the features of the SFR 1 disposal system in a safety assessment suitable for SAR-08

  13. Implementation of project Safe in Amber. Verification study for SFR 1 SAR-08

    International Nuclear Information System (INIS)

    Thomson, Gavin; Herben, Martin; Lloyd, Pam; Rose, Danny; Smith, Chris; Barra clough, Ian

    2008-03-01

    This report documents an exercise in which AMBER has been used to represent the models used in Project SAFE, a safety assessment undertaken on SFR 1. (AMBER is a flexible, graphical-user-interface based tool that allows users to build their own dynamic compartmental models to represent the migration, degradation and fate of contaminants in an environmental system. AMBER allows the user to assess routine, accidental and long-term contaminant release.) AMBER has been used to undertake assessment calculations on all of the disposal system, including all disposal tunnels and the Silo, the geosphere and several biosphere modules. The near-field conceptual models were implemented with minimal changes to the approach undertaken previously in Project SAFE. Model complexity varied significantly between individual disposal facilities increasing significantly from the BLA to the BTF and BMA tunnels and Silo. Radionuclide transport through the fractured granite geosphere was approximated using a compartment model approach in AMBER. Several biosphere models were implemented in AMBER including reasonable biosphere development, which considered the evolution of the Forsmark area from coastal to lacustrine to agricultural environments in response to land uplift. Parameters were sampled from distributions and simulations were run for 1,000 realisations. In undertaking the comparison of AMBER with the various codes and calculation tools used in Project SAFE it was necessary to undertake a detailed analysis of the modelling approach previously adopted, with particular focus given to the near-field models. As a result some discrepancies in the implementation of the models and documentation were noted. The exercise demonstrates that AMBER is fully capable of representing the features of the SFR 1 disposal system in a safety assessment suitable for SAR-08

  14. The Agricultural Model Intercomparison and Improvement Project (AgMIP): Progress and Preliminary Results

    Science.gov (United States)

    Rosenzweig, C.

    2011-12-01

    The Agricultural Model Intercomparison and Improvement Project (AgMIP) is a distributed climate-scenario simulation exercise for historical model intercomparison and future climate change conditions with participation of multiple crop and agricultural trade modeling groups around the world. The goals of AgMIP are to improve substantially the characterization of risk of hunger and world food security due to climate change and to enhance adaptation capacity in both developing and developed countries. Recent progress and the current status of AgMIP will be presented, highlighting three areas of activity: preliminary results from crop pilot studies, outcomes from regional workshops, and emerging scientific challenges. AgMIP crop modeling efforts are being led by pilot studies, which have been established for wheat, maize, rice, and sugarcane. These crop-specific initiatives have proven instrumental in testing and contributing to AgMIP protocols, as well as creating preliminary results for aggregation and input to agricultural trade models. Regional workshops are being held to encourage collaborations and set research activities in motion for key agricultural areas. The first of these workshops was hosted by Embrapa and UNICAMP and held in Campinas, Brazil. Outcomes from this meeting have informed crop modeling research activities within South America, AgMIP protocols, and future regional workshops. Several scientific challenges have emerged and are currently being addressed by AgMIP researchers. Areas of particular interest include geospatial weather generation, ensemble methods for climate scenarios and crop models, spatial aggregation of field-scale yields to regional and global production, and characterization of future changes in climate variability.

  15. The CUORE/CUORICINO project: preliminary studies

    International Nuclear Information System (INIS)

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 420 kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.) The scale of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project are briefly discussed [ru

  16. The CUORE/CUORICINO project: Preliminary studies

    International Nuclear Information System (INIS)

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 42-kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.). The state of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project, is briefly discussed

  17. Predicting Future Conflict under REDD+ Implementation

    Directory of Open Access Journals (Sweden)

    Chandra Silori

    2013-05-01

    Full Text Available With the current complexity of issues facing forest and land management, the implementation of the REDD+ initiative comes with significant risks, including conflict. While the exact nature and shape of conflict in REDD+ implementation is difficult to pinpoint, this study aims to build a preliminary predictive framework to identify possible sources of impairment that may result in conflict over management of forests and natural resources. The framework was developed from an extensive literature review and was tested in three REDD+ pilot project sites in Nepal. The results indicate that most of the sources of impairment are present in all study sites, particularly issues relating to benefit sharing, which have been main drivers of conflict prior to REDD+. While we found that the application of the framework has been useful in the Nepalese context, there are some limitations in its scope and precision. Nonetheless, this study points to important implications with regards to REDD+ implementation and conflict management that can be useful for policy makers and practitioners involved in REDD+ strategy designs, as well as other areas of forest management involving outsiders and communities.

  18. Preliminary project of s Thomson scattering system for the ETE tokamak; Projeto preliminar de um sistema de espalhamento Thomson para o Tokamak ETE

    Energy Technology Data Exchange (ETDEWEB)

    Berni, Luiz Angelo

    1997-12-31

    This report presents the preliminary project of the injection and laser light block system for the Thomson (ET) scattering diagnostic to be implanted at the ETE spheric tokamak of the Instituto Nacional de Pesquisas Espaciais (INPE/LAP). Also, a scanning system for the optics of scattered light 4 refs., 26 figs.

  19. Preliminary results of the PREFER FP7 Project

    Science.gov (United States)

    Fusilli, Lorenzo; Laneve, Giovanni; De Bonis, Roberto; Sebastian, Ana; Ferrucci, Fabrizio; Oliveira, Sandra

    2014-05-01

    The need to improve the information and intelligence support for forest fire prevention is widely recognized. Fire prevention is still the most cost-effective strategy when compared to firefighting and extinguishing that are costly, local, and triggered only in response to already ongoing crises. PREFER project, funded under the EU FP7 (G.A. 312931), intends to contribute at responding to such a pragmatic need of southern Europe's forests by: providing timely information products based on the exploitation of all available spacecraft sensors, offering a portfolio of products focused on pre- and post-crisis forest fire emergency, suitable for the users in the different countries of the European Mediterranean area. The PREFER Service portfolio consists of two main services: 1. Information Support to Fire Preparedness/Prevention Phase" (ISP) Service 2. Information Support to Fire Recovery/Reconstruction Phase" (ISR) Service This service is already at an advanced stage having completed the first year of activity. During this time several products have been consolidated: seasonal fuel maps; daily and seasonal fire hazard maps; seasonal risk maps; prescribed fire maps. This paper aims at presenting the preliminary results of the research activity carried out in the framework of the PREFER project, focusing, in particular, on these recalled above. As for Fire Risk and Hazard assessment, many indexes have been developed in the last years. Hardly any of them uses data derived from satellite images. The FPI index is an exception to this rule which, in addition, makes use of meteorological data. In spite of being a very complete index, the FPI still allows room for improvement which justify the interest of PREFER in it. PREFER's innovative approach to FPI will allow taking into account the effect of solar illumination conditions in determining the humidity present in the dead vegetation, and therefore its proneness to burn. PREFER innovation also focus in allowing the index to

  20. 10 CFR 960.3 - Implementation guidelines.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Implementation guidelines. 960.3 Section 960.3 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3 Implementation guidelines. The guidelines of this subpart...

  1. Preliminary Hazard Classification of the 1714-N, Lead Storage

    International Nuclear Information System (INIS)

    Kerr, N. R.

    1999-01-01

    The 1714-N, -NA and -NB is a building segment that was deactivated under the N Area Deactivation Project. During the deactivation the building was designated as an area to store recycled or reused lead products. This document presents the Preliminary Hazard Classification (PHC) for the continued storage of lead products by Bechtel Hanford, Inc. (BHI). Two types of hazardous substances are the focus of this PHC: lead and residual radiological contamination. An evaluation contained in this PHC concludes that there is little risk from the remaining hazardous substances. It was further concluded that standard institutional controls that are implemented under the BHI contract provide adequate protection to people and the environment. No further safety analysis documentation is required for the continued lead storage

  2. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  3. Pre-contract project scoping processes : synthesis of practices.

    Science.gov (United States)

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  4. Effectiveness of Agile Implementation Methods in Business Intelligence Projects from an End-user Perspective

    Directory of Open Access Journals (Sweden)

    Anna Maria Misiak

    2016-06-01

    Full Text Available The global Business Intelligence (BI market grew by 10% in 2013 according to the Gartner Report. Today organizations require better use of data and analytics to support their business decisions. Internet power and business trend changes have provided a broad term for data analytics – Big Data. To be able to handle it and leverage a value of having access to Big Data, organizations have no other choice than to get proper systems implemented and working. However traditional methods are not efficient for changing business needs. The long time between project start and go-live causes a gap between initial solution blueprint and actual user requirements in the end of the project. This article presents the latest market trends in BI systems implementation by comparing Agile with traditional methods. It presents a case study provided in a large telecommunications company (20K employees and the results of a pilot research provided in the three large companies: telecommunications, digital, and insurance. Both studies prove that Agile methods might be more effective in BI projects from an end-user perspective and give first results and added value in a much shorter time compared to a traditional approach.

  5. Conflict free implementation of strategic project management office at the Entitie level utilizing “Evaporated cloud” diagram

    OpenAIRE

    Oganov, A.; Gogunsky, V.

    2015-01-01

    The analysis of reports on the last researches in area of project management office (PMO) in the organizations is carried out. Comparison of approaches in project management at the entities with PMO of different levels of a maturity and without it is executed. It is shown that the effectiveness of organizations orientation determined by the level of activity on project approaches, implemented with the help of Project Management Office through continuous improvement of design processes and ope...

  6. Practical implementation of joint projects for offshore wind; Praktiskt genomfoerande av gemensamma projekt foer havsbaserad vindkraft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-01

    Cooperation mechanisms are part of the renewable s directive and aims to member countries to cooperate on renewable energy to meet their national targets a cost effective way. The Energy Agency has in previous assignments analyzed the possibilities and limitations of cooperation mechanisms and other countries' interest in the cooperation mechanisms. In the Appropriation Directions for 2013, the Energy Agency has been asked to contribute to the continued analysis and practical preparations for a possible cooperation with other member countries. The assignment covers several different types of cooperation. This report represents the Agency's accounting of the part of the commission on cooperation through joint projects. This part include, in consultation with the industry to develop a proposal for the practical use for the implementation of possible joint projects for offshore wind power. The mission aims to create greater clarity and facilitate the possible implementation of joint projects.

  7. Empirical testing of selected critical success factors in CRM implementation projects - A study of SMEs in the B2B sector

    OpenAIRE

    Röschmann, Kathrin; Ziyadullaeva, Muhayyo

    2011-01-01

    Purpose:The purpose of this thesis is to describe and analyze critical success factors of CRM implementation projects with a special focus on SME’s in the B2B sector.  Method: This study is based on quantitative research using survey method.  Target Audience: SMEs of B2B business, which are planning to implement a CRM system Academic audience, which is interested in CRM implementation with focus on SME.  Conclusion: There are various critical success factors in CRM implementation projects and...

  8. A Case Study on the Implementation of a Positive Youth Development Program (Project P.A.T.H.S. in Hong Kong: Learning from the Experimental Implementation Phase

    Directory of Open Access Journals (Sweden)

    Tak Yan Lee

    2008-01-01

    Full Text Available This investigation of the implementation of a positive youth development program (Project P.A.T.H.S. was part of a large study undertaken comprehensively to explore how effective the Tier 1 Program was in practice and how the results can shed light on future developments. Utilizing a case study approach, individual and focus group interviews were conducted in 2007 to examine the factors that influence the process and quality of implementation of the Tier 1 Program of the Project P.A.T.H.S. The focus of this study was on how the implementers of a school made use of the experience gained in the Experimental Implementation Phase (EIP in 2005/06 to improve the program implementation quality in the Full Implementation Phase (FIP in 2006/07. Results showed that the program implementation in the FIP was generally high and the program was well received by the implementers. Factors that facilitated the implementation of the program were identified, including the adoption of an incremental change strategy, the incorporation of the program into both formal and informal curricula, positive perceptions of the program among staff and agency social workers, sufficient school administrative support, excellent cooperation between the school and the social work agency, presence of a dedicated school contact person and instructors who engaged themselves in continuous quality improvement of the implementation, and an emphasis on application of what had been learned. Difficulties encountered by the school in the process of implementation were also observed. Based on the present findings, key process variables that facilitate or impede the implementation of positive youth development programs are discussed. Implications for future program implementation are also discussed.

  9. Impacts of the Implementation of a Project Management Information System – a Case Study of a Small R

    Directory of Open Access Journals (Sweden)

    Borštnar Mirjana Kljajić

    2014-02-01

    Full Text Available Background: The problems of resources management (human, financial, time in multi-project companies are inherently complex and need to be addressed systematically, in both small and large organizations. Furthermore, there is a need for transparent communication and collaboration within the organization as well as with partnering organizations. There are many methodologies and tools supporting project management, which are themselves complex and are therefore not widely adopted, especially among small companies. Objectives: The aim of this paper is to analyse impact of the implementation of a flexible cloud-based project management information system (PMIS from the human resources, financial management, and collaboration points of view. Method: We have conducted a case study in a small Slovenian research and development company, that has implemented the 4PM PMIS. Results: The findings imply the importance of keeping the balance of the creative processes that are unstructured, rule free and even chaotic, with structured processes monitor and control. Conclusions: The results of the study suggest that the use of “4PM” in support of multi-project management improves human resources and financial management in a collaborative and transparent way when implemented in an open and highly motivated environment

  10. Patient-centred hand hygiene information in orthopaedics units: an evidence-based implementation project.

    Science.gov (United States)

    Ong, Arielle Yi Jia; Tan, Joanne; Yeo, Hui Ling; Goh, Mien Li

    2017-03-01

    This project aimed to improve patients' knowledge on the importance of hand hygiene. It involved providing patients with a patient and family education on the importance of hand hygiene using a patient information leaflet that introduces the rationale of hand hygiene, possible consequences of poor hand hygiene, and the seven steps of hand hygiene. This projected used a preimplementation and postimplementation audit strategy using the Joanna Briggs Institute Practical Application of Clinical Evidence System and Getting Research Into Practice programs. The implementation occurred in three phases over a period of 6 months from January 2014 to June 2014. The audits took place in two orthopaedic wards in a large acute care setting tertiary hospital in Singapore and involved a sample size of 54 patients. It involved going through the medical records of the cases, assessment of patient knowledge based on the audit criteria, and checking if the patients received the patient information leaflet on hand hygiene. The postimplementation audit found significant improvements in all three audit criteria. The percentage of patients who demonstrated knowledge in the importance of hand hygiene saw an improvement of 48.1%. There was an improvement of 44.5% in nurses' compliance to the documentation of patient education being carried out. The percentage of patients who received a patient information leaflet on hand hygiene saw an increase of 36.1%. This project demonstrated that a preimplementation and postimplementation audit is a viable method to implement change and translate evidence into practice. Through this project, patients gained an understanding on the importance of hand hygiene and could take better ownership of their well being. This may potentially improve hospitalization experience and benefit health outcomes. The positive results of this project are contributed by the enthusiastic involvement of all the stakeholders, from patients and their caregivers to the bedside

  11. Design, Implementation, and Lessons Learned from a Digital Storytelling Project in an Undergraduate Health Promotion Theory Course

    Science.gov (United States)

    Rimando, Marylen; Smalley, K. Bryant; Warren, Jacob C.

    2015-01-01

    This article describes the design, implementation and lessons learned from a digital storytelling project in a health promotion theory course. From 2011-2012, 195 health promotion majors completed a digital storytelling project at a Midwestern university. The instructor observed students' understanding of theories and models. This article adds to…

  12. Preliminary results of BRAVO project: brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks.

    Science.gov (United States)

    Bergamasco, Massimo; Frisoli, Antonio; Fontana, Marco; Loconsole, Claudio; Leonardis, Daniele; Troncossi, Marco; Foumashi, Mohammad Mozaffari; Parenti-Castelli, Vincenzo

    2011-01-01

    This paper presents the preliminary results of the project BRAVO (Brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks). The objective of this project is to define a new approach to the development of assistive and rehabilitative robots for motor impaired users to perform complex visuomotor tasks that require a sequence of reaches, grasps and manipulations of objects. BRAVO aims at developing new robotic interfaces and HW/SW architectures for rehabilitation and regain/restoration of motor function in patients with upper limb sensorimotor impairment through extensive rehabilitation therapy and active assistance in the execution of Activities of Daily Living. The final system developed within this project will include a robotic arm exoskeleton and a hand orthosis that will be integrated together for providing force assistance. The main novelty that BRAVO introduces is the control of the robotic assistive device through the active prediction of intention/action. The system will actually integrate the information about the movement carried out by the user with a prediction of the performed action through an interpretation of current gaze of the user (measured through eye-tracking), brain activation (measured through BCI) and force sensor measurements. © 2011 IEEE

  13. Economic and ecological advantages of innovative project implementation at woodworking industry

    Directory of Open Access Journals (Sweden)

    Irina N. Yepifanova

    2015-03-01

    Full Text Available Orientation to innovative development involves the strategic focus onto manufacturing high-tech products in the priority sectors of the economy. Implementation of innovative projects aimed at reducing the energy component in overall costs of enterprise is demanded and necessary. The aim of the research is to prove the economic and ecological benefits of using at domestic wood industry enterprises the wood pellets as an alternative biofuel. The main economic indicators of the project for the pellets production presented indicate the expenses-to-profits ratio; studied is the cost of season heating in Ukraine of 1000 m2 with both traditional and alternative fuels. Noted is that the use of pellets as ecological biofuel is more economical in comparison with electricity and gas. Exposed are the economic benefits of the pellet boiler heating by different fuels.

  14. Preliminary assessments the shortcut to remediation (category III-surplus facility assessments)

    International Nuclear Information System (INIS)

    Byars, L.L.

    1995-01-01

    This report presents the details of the preliminary assessments for the shortcut of decontamination of surplus nuclear facilities. Topics discussed include: environment, health and safety concerns; economic considerations; reduction of transition time; preliminary characterization reports; preliminary project plan; health and safety plan; quality assurance plan; surveillance and maintenance plan; and waste management plan

  15. A new procedure for implementing a geological disposal

    International Nuclear Information System (INIS)

    Anon.

    2014-01-01

    The British government has launched a new procedure for selecting and implementing a geological disposal. This procedure is based on long-term cooperation with municipalities that wish to home this facility. In a preliminary 2 year long step, a national geological survey will be performed in order to determine regions that are suitable to home a geological disposal. Then discussions between municipalities that are voluntary and the enterprise in charge of developing the project will begin. Municipalities will receive an investment up to 1 million pounds a year in the first years of the selecting procedure and then 2.5 million pounds a year when discussions become more formal. British authorities consider that the procedure for selecting a site may last up to 20 years. A previous attempt to find a site failed in 2013 when 2 regions that had been interested in the project since 2008, were finally rebuffed by the regional council that opposed the project. Scotland and Wales have their own strategy for the management of radioactive waste. (A.C.)

  16. Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment

    Directory of Open Access Journals (Sweden)

    Hamid Abdul

    2017-01-01

    Full Text Available Refurbishment process is a conceptual stage in product life cycle. It is utilized in existing equipment in the field by adding value to recondition and repaired equipment. The main interest of this paper is to implement and design risk management implementation phase in oil field development project on the refurbishment of critical equipment in oil and gas industry. This paper is provided base on research and experiences in risk management and learned from practical team in industry which matched by an application in oil field development project in refurbishment of critical equipment. A framework of implementation phase for risk management in oil field development project in refurbishment critical equipment were reviewed and added value on communication skills of the project team to the stakeholder and organization, which support to external body and vice-versa. Risk management framework can be used for reference of refurbishment process with simply process and developed with same concept for the next wide development project in industry.

  17. Renewable energy supply systems in Indonesia. The Activities Implemented Jointly (AIJ) project of the E7 initiative. A case study

    Energy Technology Data Exchange (ETDEWEB)

    Betz, R.

    1999-02-01

    The Renewable Energy Supply System Project, short RESS project, is an Activities Implemented Jointly (AIJ) project carried out by the E7-Initiative combining eight of the world's largest electric utilities of G7 countries (RWE AG Germany is the main coordinator of this project). The first part of the chapter gives a description of the project's background, organisation and different components including the financial aspects and the present state of implementation of the RESS project. The second part presents the evaluation of the project: on the one hand primary objectives will be analysed from the investor's view, on the other hand secondary objectives from a more development co-operation and political point of view. In the final part general problems and especially problems relevant to the further development of the Clean Development Mechanism (CDM) will be summed up. (orig.)

  18. Designing and Implementing an Online GIS Tool for Schools: The Finnish Case of the PaikkaOppi Project

    Science.gov (United States)

    Riihelä, Juha; Mäki, Sanna

    2015-01-01

    This article describes initiatives implemented in Finland to create an online learning environment for studying geographic information systems (GIS). A development project produced an online GIS tool called PaikkaOppi, aimed at promoting GIS studies and spatial thinking skills in upper secondary schools. The project is reviewed through analysis of…

  19. A coordinated school health approach to obesity prevention among Appalachian youth: the Winning with Wellness Pilot Project.

    Science.gov (United States)

    Schetzina, Karen E; Dalton, William T; Lowe, Elizabeth F; Azzazy, Nora; VonWerssowetz, Katrina M; Givens, Connie; Pfortmiller, Deborah T; Stern, H Patrick

    2009-01-01

    Childhood obesity has been an increasing problem in the United States, especially in rural areas. Effective prevention approaches are needed. This article describes the development, implementation, effectiveness, feasibility, and sustainability of a school-based obesity prevention pilot project, Winning with Wellness. The program was based on the coordinated school health model and included a community-based participatory research approach aimed at promoting healthy eating and physical activity in a rural Appalachian elementary school. Findings from this preliminary project revealed improvements in nutrition offerings and increased physical activity during the school day. In addition, the program was found to be acceptable to teachers, successfully implemented utilizing both existing and newly developed resources, and sustainable as evidenced in continued practice and expansion to other area schools.

  20. Design, Implementation, and Evaluation of the Adolescents and Surveillance System for the Obesity Prevention Project.

    Science.gov (United States)

    Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina

    2016-03-01

    The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents' obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data.The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have.This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries' needs and priorities.The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries' Health Services for monitoring adolescents' obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles.

  1. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  2. Discussion after implementation of possible ergonomics contributions in production lines automation project

    Directory of Open Access Journals (Sweden)

    José Adriano Canton

    2016-11-01

    Full Text Available This paper addresses the issue of work spaces designed based on Activity-Centered Ergonomics. The aim was to reflect on the role of Ergonomics in the design of productive situations in order to anticipate and mitigate the emergence of new constraints. This study was developed using a case study from the packaging industry, where an automated line was implemented to mitigate the injuries suffered as result of the manual system. This article was based on the results of an Ergonomic Work Analysis of the solution implemented, and the subsequent analysis of this design process. It was found that the adopted solution does not have enough leeway for dealing with variations inherent to the process, requiring constant interventions in the operation, by the operators in order to free the line to continue work. It was evident that the adopted solution did not involve the participation of important agents such as the operators and the maintenance crew, giving the project a technical vision that was concerned with eliminating the human factor. The conclusion of this study was that the Ergonomics integrated into the project development favors the collective construction of analysis of the research, and consequently, the development of more effective solutions.

  3. Implementing OWL Defaults

    National Research Council Canada - National Science Library

    Kolovski, Vladimir; Parsia, Bijan; Katz, Yarden

    2006-01-01

    ...) have often requested some form of non-monotonic reasoning. In this paper, we present preliminary optimizations and an implementation of a restricted version of Reiter's default logic as an extension to the description logic fragment of OWL, OWL DL...

  4. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  5. Brazilian Federal Police drug chemical profiling - the PeQui project.

    Science.gov (United States)

    Zacca, Jorge J; Botelho, Elvio Dias; Vieira, Maurício L; Almeida, Fernanda L A; Ferreira, Luciana S; Maldaner, Adriano O

    2014-07-01

    Over the past six years the Brazilian Federal Police has undertaken major efforts in order to implement and to develop its own drug chemical profiling program. This paper aims to provide a broad perspective regarding the managerial strategies and some examples of subsequent technical issues involved in the implementation of such a project. Close collaboration with local drug enforcement and investigation teams, establishment of proper worldwide partnerships with well recognized institutions in the field of drug analysis and the attainment of suitable funding and human resources are shown to be key success factors. Some preliminary results concerning the chemical profile of cocaine seizures in Brazil during this process are presented. Copyright © 2014 Forensic Science Society. Published by Elsevier Ireland Ltd. All rights reserved.

  6. Innovations in mental health services implementation: a report on state-level data from the U.S. Evidence-Based Practices Project.

    Science.gov (United States)

    Magnabosco, Jennifer L

    2006-05-30

    The Evidence-Based Practice (EBP) Project has been investigating the implementation of evidence-based mental health practices (Assertive Community Treatment, Family Psychoeducation, Integrated Dual Diagnosis Treatment, Illness Management and Recovery, and Supported Employment) in state public mental health systems in the United States since 2001. To date, Project findings have yielded valuable insights into implementation strategy characteristics and effectiveness. This paper reports results of an effort to identify and classify state-level implementation activities and strategies employed across the eight states participating in the Project. Content analysis and Greenhalgh et al's (2004) definition of innovation were used to identify and classify state-level activities employed during three phases of EBP implementation: Pre-Implementation, Initial Implementation and Sustainability Planning. Activities were coded from site visit reports created from documents and notes from key informant interviews conducted during two periods, Fall 2002-Spring 2003, and Spring 2004. Frequency counts and rank-order analyses were used to examine patterns of implementation activities and strategies employed across the three phases of implementation. One hundred and six discreet implementation activities and strategies were identified as innovative and were classified into five categories: 1) state infrastructure building and commitment, 2) stakeholder relationship building and communications, 3) financing, 4) continuous quality management, and 5) service delivery practices and training. Implementation activities from different categories were employed at different phases of implementation. Insights into effective strategies for implementing EBPs in mental health and other health sectors require qualitative and quantitative research that seeks to: a) empirically test the effects of tools and methods used to implement EBPs, and b) establish a stronger evidence-base from which to plan

  7. Innovations in mental health services implementation: a report on state-level data from the U.S. Evidence-Based Practices Project

    Directory of Open Access Journals (Sweden)

    Magnabosco Jennifer L

    2006-05-01

    Full Text Available Abstract Background The Evidence-Based Practice (EBP Project has been investigating the implementation of evidence-based mental health practices (Assertive Community Treatment, Family Psychoeducation, Integrated Dual Diagnosis Treatment, Illness Management and Recovery, and Supported Employment in state public mental health systems in the United States since 2001. To date, Project findings have yielded valuable insights into implementation strategy characteristics and effectiveness. This paper reports results of an effort to identify and classify state-level implementation activities and strategies employed across the eight states participating in the Project. Methods Content analysis and Greenhalgh et al's (2004 definition of innovation were used to identify and classify state-level activities employed during three phases of EBP implementation: Pre-Implementation, Initial Implementation and Sustainability Planning. Activities were coded from site visit reports created from documents and notes from key informant interviews conducted during two periods, Fall 2002 – Spring 2003, and Spring 2004. Frequency counts and rank-order analyses were used to examine patterns of implementation activities and strategies employed across the three phases of implementation. Results One hundred and six discreet implementation activities and strategies were identified as innovative and were classified into five categories: 1 state infrastructure building and commitment, 2 stakeholder relationship building and communications, 3 financing, 4 continuous quality management, and 5 service delivery practices and training. Implementation activities from different categories were employed at different phases of implementation. Conclusion Insights into effective strategies for implementing EBPs in mental health and other health sectors require qualitative and quantitative research that seeks to: a empirically test the effects of tools and methods used to implement EBPs

  8. The implementation of the Open Access paradigm to the EC-FP7 MED-SUV (Mediterranean Supersite Volcanoes) project

    Science.gov (United States)

    Puglisi, Giuseppe; Brito, Fabrice; Caumont, Hervé; D'Auria, Luca; Fernandez, José; Mazzetti, Paolo; Mathieu, Pierre Philippe; Nativi, Stefano; Papeschi, Fabrizio; Pepe, Antonio; Reitano, Danilo; Sangianantoni, Agata; Scarpato, Giovanni; Spampinato, Letizia

    2016-04-01

    The overall goal of the EC-FP7 Mediterranean Supersite Volcanoes (MED-SUV) project is to apply the rationale of the Supersites GEO initiative to Campi Flegrei/Vesuvius and Mt. Etna to reduce the volcanic risk, by improving the understanding of the underlying geophysical processes, through the integration and sharing of the in-situ and Earth Observation (EO) data sets and the implementation of new instruments and monitoring systems. The project involves 24 EU and no-EU partners, including research and academic institutions, space agencies and SMEs. In this framework, the application of the Open Access paradigm has offered the opportunity to study and apply practical solutions concerning the data management (i.e. data polices, foreground exploitation and sustainability), intellectual property rights (i.e., ownership, licences, agreements) and technical issues (i.e., design and implementation of an interoperability e-infrastructure, access systems, etc.). This contribution presents pro and cons encountered in the project, as well as the main outcomes of the implementation of the Open Access to the Italian Supersites. This experience will be exploited in the building of international research infrastructures, such as EPOS, and the outcomes of the project will contribute to foster the Open Access to the research data in a wide context, as the GEO-GEOSS framework.

  9. Managing the ERP implementation journey - change in discourse from classical IT project to technology-driven organisational change initiative

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Rose, Jeremy

    In the implementation of an ERP system in a large Danish production company (here referred to as Omega), discourse surrounding the project changed appreciably during the course of the project. Drawing on recent adaptations of discourse theory, we provide a theoretical model which relates technolo...

  10. Using implementation science as the core of the doctor of nursing practice inquiry project.

    Science.gov (United States)

    Riner, Mary E

    2015-01-01

    New knowledge in health care needs to be implemented for continuous practice improvement. Doctor of nursing practice (DNP) programs are designed to increase clinical practice knowledge and leadership skills of graduates. This article describes an implementation science course developed in a DNP program focused on advancing graduates' capacity for health systems leadership. Curriculum and course development are presented, and the course is mapped to depict how the course objectives and assignments were aligned with DNP Essentials. Course modules with rational are described, and examples of how students implemented assignments are provided. The challenges of integrating this course into the life of the school are discussed as well as steps taken to develop faculty for this capstone learning experience. This article describes a model of using implementation science to provide DNP students an experience in designing and managing an evidence-based practice change project. Copyright © 2015 Elsevier Inc. All rights reserved.

  11. Effort estimation for enterprise resource planning implementation projects using social choice - a comparative study

    Science.gov (United States)

    Koch, Stefan; Mitlöhner, Johann

    2010-08-01

    ERP implementation projects have received enormous attention in the last years, due to their importance for organisations, as well as the costs and risks involved. The estimation of effort and costs associated with new projects therefore is an important topic. Unfortunately, there is still a lack of models that can cope with the special characteristics of these projects. As the main focus lies in adapting and customising a complex system, and even changing the organisation, traditional models like COCOMO can not easily be applied. In this article, we will apply effort estimation based on social choice in this context. Social choice deals with aggregating the preferences of a number of voters into a collective preference, and we will apply this idea by substituting the voters by project attributes. Therefore, instead of supplying numeric values for various project attributes, a new project only needs to be placed into rankings per attribute, necessitating only ordinal values, and the resulting aggregate ranking can be used to derive an estimation. We will describe the estimation process using a data set of 39 projects, and compare the results to other approaches proposed in the literature.

  12. Description and Life Cycle of the Implementation of a Multi-Sport Complex called "VELODROME"

    Directory of Open Access Journals (Sweden)

    Wellington Silva Gomes

    2016-07-01

    Full Text Available The purpose of this article is to present a the project of a Multi-Purpose Sport Complex with its outlined infrastructure based on essential ideas that will lead to preliminary studies. The paper presents a brief historical overview of the local environment and of the systemic universe of the organization at all levels. These factors are decisive for the creation of the spaces in the Complex, directed not only to sports, but also to culture and leisure; making it necessary to seek identification of guiding requirements for its implementation in order to detect possible deviations in certain phases of the project implementation stages. Thus, according to a study of the development life cycle, the intention is to define the appropriate feedback system, aiming to correct deficiencies and making adjustments throughout the process in order to obtain the relevant certificates, certifications and authorizations, thus obtaining from internal and external customers proper approval during the construction process and the use phase.

  13. NEOLITHIC PLANT USE IN THE WESTERN MEDITERRANEAN REGION: PRELIMINARY RESULTS FROM THE AGRIWESTMED PROJECT

    Directory of Open Access Journals (Sweden)

    L. Peña-Chocarro

    2013-04-01

    Full Text Available This contribution focuses on the preliminary results of the AGRIWESTMED project which focuses on the archaeobotanical analyses of early Neolithic sites in the western Mediterranean region (both in Iberia and in northern Morocco. A large number of sites has been studied producing an interesting dataset of plant remains which places the earliest examples of domesticated plants in the second half of the 6th millennium cal BC. Plant diversity is high as it is shown by the large number of species represented: hulled and naked wheats, barley, peas, fava beans, vetches, lentils and grass peas. To more crops, poppy and flax, are also part of the first agricultural crops of the area. Although agriculture seems to occupy a first place in the production of food, gathering is well represented in the Moroccan sites where a large number of species has been identified. 

  14. The central Iowa project.

    Science.gov (United States)

    Allen, H M

    1994-10-01

    This project developed and tested a population-based survey, the HS Form, to examine health and health care in the Central Iowa community. Data from this new collection of proven sets of items were used to compare competing health plans, doctor offices, hospitals, and to develop preliminary norms of the community's insured, in two areas: system performance and health burden. The results showed that the survey: (1) was both feasible and efficient in delivering a comprehensive and generic assessment of consumers and patients; (2) revealed consistent, noteworthy differences between plans and between providers across both sets of criteria; and (3) indicated that there is substantial room for improvement in Central Iowa's health care delivery system from the public's perspective. Recommendations for next steps include: (1) following through on the June 1993 community forum (held to discuss the project's methods and results with local decision makers); (2) broadening the evaluation design to increase sample representativeness; and (3) implementing a pre/post approach to measure changes in plan and provider performance.

  15. Development of the evaluation instrument use CIPP on the implementation of project assessment topic optik

    Science.gov (United States)

    Asfaroh, Jati Aurum; Rosana, Dadan; Supahar

    2017-08-01

    This research aims to develop an evaluation instrument models CIPP valid and reliable as well as determine the feasibility and practicality of an evaluation instrument models CIPP. An evaluation instrument models CIPP to evaluate the implementation of the project assessment topic optik to measure problem-solving skills of junior high school class VIII in the Yogyakarta region. This research is a model of development that uses 4-D. Subject of product trials are students in class VIII SMP N 1 Galur and SMP N 1 Sleman. Data collection techniques in this research using non-test techniques include interviews, questionnaires and observations. Validity in this research was analyzed using V'Aikens. Reliability analyzed using ICC. This research uses 7 raters are derived from two lecturers expert (expert judgment), two practitioners (science teacher) and three colleagues. The results of this research is the evaluation's instrument model of CIPP is used to evaluate the implementation of the implementation of the project assessment instruments. The validity result of evaluation instrument have V'Aikens values between 0.86 to 1, which means a valid and 0.836 reliability values into categories so well that it has been worth used as an evaluation instrument.

  16. Preliminary Analysis and Selection of Mooring Solution Candidates

    DEFF Research Database (Denmark)

    Thomsen, Jonas Bjerg; Delaney, Martin

    This report covers a preliminary analysis of mooring solutions candidates for four large floating wave energy converters. The work is part of the EUDP project “Mooring Solutions for Large Wave Energy Converters” and is the outcome of "Work Package 3: Preliminary Analysis". The report further...... compose the "Milestone 4: Report on results of preliminary analysis and selection of final candidates. The report is produced by Aalborg University with input from the partner WECs Floating Power Plant, KNSwing, LEANCON and Wave Dragon. Tension Technology International (TTI) has provided a significant...

  17. Preliminary safety evaluation for the spent nuclear fuel project`s cold vacuum drying system

    Energy Technology Data Exchange (ETDEWEB)

    Garvin, L.J., Westinghouse Hanford

    1996-07-01

    This preliminary safety evaluation (PSE) considers only the Cold Vacuum Drying System (CVDS) facility and its mission as it relates to the integrated process strategy (WHC 1995). The purpose of the PSE is to identify those CBDS design functions that may require safety- class and safety-significant accident prevention and mitigation features.

  18. Assessment and management of burn pain at the Komfo Anokye Teaching Hospital: a best practice implementation project.

    Science.gov (United States)

    Bayuo, Jonathan; Munn, Zachary; Campbell, Jared

    2017-09-01

    Pain management is a significant issue in health facilities in Ghana. For burn patients, this is even more challenging as burn pain has varied facets. Despite the existence of pharmacological agents for pain management, complaints of pain still persist. The aim of this project was to identify pain management practices in the burns units of Komfo Anokye Teaching Hospital, compare these approaches to best practice, and implement strategies to enhance compliance to standards. Ten evidence-based audit criteria were developed from evidence summaries. Using the Joanna Briggs Institute Practical Application of Clinical Evidence Software (PACES), a baseline audit was undertaken on a convenience sample of ten patients from the day of admission to the seventh day. Thereafter, the Getting Research into Practice (GRiP) component of PACES was used to identify barriers, strategies, resources and outcomes. After implementation of the strategies, a follow-up audit was undertaken using the same sample size and audit criteria. The baseline results showed poor adherence to best practice. However, following implementation of strategies, including ongoing professional education and provision of assessment tools and protocols, compliance rates improved significantly. Atlhough the success of this project was almost disrupted by an industrial action, collaboration with external bodies enabled the successful completion of the project. Pain management practices in the burns unit improved at the end of the project which reflects the importance of an audit process, education, providing feedback, group efforts and effective collaboration.

  19. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Keefe, MaryLouise; Carmichael, Richard W.; French, Rod A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1993-03-01

    This report covers the first year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary. The most crucial data for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available. A comprehensive fish health monitoring regimen was incorporated into the monitoring and evaluation study for Umatilla Hatchery. This is a unique feature of the Umatilla Hatchery evaluation project.

  20. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  1. Important projects are being implemented jointly

    International Nuclear Information System (INIS)

    Medeliene, D.

    1998-01-01

    Full text: Sweden is continuing its support to Lithuania in the field of nuclear safety. The major current projects include the testing of gap between graphite and pressure tube measuring device, the pressure tube investigation of material properties, content of hydrogen, microstructure, etc., ALS Structure verification using non-destructive testing, Conceptual study on Leak Before Break, Management seminars for VATESI, Multimedia System for the Ignalina NPP's Information Center and Waste management projects. Some of the projects are partially financed by Ignalina NPP. Sweden and Norway provide financing for the extremely important and expensive project - Physical protection: perimeter around the plant. Two new EC projects, Continuation of support to VATESI: licensing, inservice and decommissioning, and Phare TSO project to help building up TSO competence in Lithuania are no less important. In the beginning of September a functional exercise was organised with the Ignalina NPP emergency preparedness Information unit. This exercise was the second one of the two to prepare the personnel for the problems they have to solve in communication with public and media in the case of an accident at the Ignalina NPP

  2. CONTRIBUTIONS OF CAD / CAE TECHNOLOGY IN DEVELOPMENT PROJECTS OF AGRICULTURAL MACHINERY AND IMPLEMENTS: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Flavio Ricci Martinez

    2017-12-01

    Full Text Available This work aims to understand the contributions of CAD / CAE technology development projects Agricultural Machinery and Implements. The segment of Agricultural Machinery and Implements part of capital goods, which provides items that will be used to produce goods and services in other sectors and that is strategic in many economically and for innovation and technological diffusion in the country sector. To achieve the proposed objective a case study was conducted at a manufacturer of this type of product (combines, planters, tractors, etc. located in the region of Ribeirão Preto. Among the main contributions can excel found to reduce the time and costs of the project, the largest customer interaction, integration with the staff and the increased ability to test alternative solutions for solving problems.

  3. Quality control and data-handling in multicentre studies: the case of the Multicentre Project for Tuberculosis Research

    Directory of Open Access Journals (Sweden)

    Caloto Teresa

    2001-12-01

    Full Text Available Abstract Background The Multicentre Project for Tuberculosis Research (MPTR was a clinical-epidemiological study on tuberculosis carried out in Spain from 1996 to 1998. In total, 96 centres scattered all over the country participated in the project, 19935 "possible cases" of tuberculosis were examined and 10053 finally included. Data-handling and quality control procedures implemented in the MPTR are described. Methods The study was divided in three phases: 1 preliminary phase, 2 field work 3 final phase. Quality control procedures during the three phases are described. Results: Preliminary phase: a organisation of the research team; b design of epidemiological tools; training of researchers. Field work: a data collection; b data computerisation; c data transmission; d data cleaning; e quality control audits; f confidentiality. Final phase: a final data cleaning; b final analysis. Conclusion The undertaking of a multicentre project implies the need to work with a heterogeneous research team and yet at the same time attain a common goal by following a homogeneous methodology. This demands an additional effort on quality control.

  4. Preliminary results from the ESA STSE project on SST diurnal variability, its regional extent and implications in atmospheric modelling (SSTDV:R.EX.–IM.A.M.)

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Hasager, Charlotte Bay; Høyer, Jacob L.

    2013-01-01

    This study presents some preliminary results of the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). Comparisons of SEVIRI SST with AATSR...

  5. Improving Astronomy Achievement and Attitude through Astronomy Summer Project: A Design, Implementation and Assessment

    Science.gov (United States)

    Türk, Cumhur; Kalkan, Hüseyin; Iskeleli', Nazan Ocak; Kiroglu, Kasim

    2016-01-01

    The purpose of this study is to examine the effects of an astronomy summer project implemented in different learning activities on elementary school students, pre-service elementary teachers and in-service teachers' astronomy achievement and their attitudes to astronomy field. This study is the result of a five-day, three-stage, science school,…

  6. Status of the RA research reactor decommissioning project

    International Nuclear Information System (INIS)

    Ljubenov, V.; Nikolic, D.; Pesic, M.; Milosevic, M.; Kostic, Lj.; Steljic, M.; Sotic, O.; Antic, D. . E-mail address of corresponding author: vladan@vin.bg.ac.yu; Ljubenov, V.)

    2005-01-01

    The 6.5 MW heavy water RA research reactor at the VINCA Institute of Nuclear Sciences operated from 1959 to 1984. After 18 years of extended shutdown in 2002 it was decided that the reactor shutdown should be final. Preliminary decommissioning activities have been initiated by the end of 2002 under the Technical Co-operation Programme of the International Atomic Energy Agency. The objective of the project is to implement safe, timely and cost-effective decommissioning of the RA reactor up to unrestricted use of the site. Decommissioning project is closely related to two other projects: Safe Removal of the RA Reactor Spent Nuclear Fuel and Radioactive Waste Management in VINCA Institute. The main phases of the project include preparation of the detailed decommissioning plan, radiological characterization of the reactor site, dismantling and removal of the reactor components and structures, decontamination, final radiological site survey and the documentation of all the activities in order to obtain the approval for unrestricted use of the facility site. In this paper a review of the activities related to the preparation and realization of the RA reactor decommissioning project is given. Status of the project's organizational and technical aspects as for July 2004 are presented and plans for the forthcoming phases of the project realization are outlined. (author)

  7. Small hydro project in Wohlen, Bern - Preliminary study; Programm Kleinwasserkraftwerke. KWKW Hofenmuehle, Wohlen BE - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Fritschi, M.; Spescha, P.

    2008-11-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the preliminary project study for the refurbishment of an existing small hydropower installation in Wohlen, Bern, Switzerland. The installation is in the Hofenmuehle, a listed mill complex dating from the first half of the nineteenth century. The headrace channel has already been refurbished by a community service group. The high level of financial effort and the idealism of the owner families are noted. The existing installations are described in detail. The refurbishment of the technical equipment and the associated work such as water-flow measurements are discussed. Cost estimates and environmental aspects are presented and discussed as are the financing of the refurbishment work and the cost-covering remuneration for the power produced. A possible increase in the power produced and the associated water-usage concession are discussed.

  8. Joint implementation - project simulation and organisation. Operationalization of a new instrument of climate policy

    International Nuclear Information System (INIS)

    Luhmann, H.J.; Ott, H.E.; Beuermann, C.; Fischedick, M.; Hennicke, P.; Bakker, L.

    1997-01-01

    The study served to analyze the practical aspects of 'Joint Implementation' (JI) under the Framework Convention on Climate Change, in which measures to reduce greenhouse gas emissions are carried out jointly by several countries. As a first step, possible climate protection measures were assessed with respect to their suitability for JI and an overview of suitable JI projects was compiled. In a further step, carried out in cooperation with partners from industry, four specific projects (coal-fired power plant, solar-thermal power plant, cement factory, least-cost planning) were used to simulate JI. In this work, solutions were developed for the calculation of greenhouse gas emissions avoided as well as for project reporting. In addition, proposals were made with respect to the organizational and institutional design on an international JI mechanism. (orig.) [de

  9. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  10. Project Rulison: a preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M Jr; Bray, B G; Mann, R L

    1970-01-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Tuli Rulison field in Garfield County, Colorado. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90 to 125 billion cu ft per 640 acres from earlier wells, was confirmed from information obtained on 2 conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas-flow computer model. (20 refs.)

  11. The Implementation of Transportation and Transit Projects on the Basis of Public-Private Partnership in Russia

    OpenAIRE

    Valery Anatolyevich Tsevtkov; Kobilzhon Khodzhievich Zoidov; Alexey Anatolyevich Medkov

    2016-01-01

    The article considers the main directions of the implementation of the current transportation and transit projects on the basis of the institution of public-private partnership in Russia. This work is a continuation of the study of the theory and practice of the application of public-private partnership in the investment projects aimed at the development and realization of the transportation and transit potential of the country. On the methodological basis of evolutionary and institu...

  12. Project planning of Gen-IV sodium cooled fast reactor technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-15

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO{sub 2} Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety.

  13. Project planning of Gen-IV sodium cooled fast reactor technology

    International Nuclear Information System (INIS)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-01

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO 2 Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety

  14. Implementing a Capital Plan.

    Science.gov (United States)

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  15. The Challenge of Implementing an ERP System in a Small and Medium Enterprise--A Teaching Case of ERP Project Management

    Science.gov (United States)

    Xu, Hongjiang; Rondeau, Patrick J.; Mahenthiran, Sakthi

    2011-01-01

    Enterprise Resource Planning (ERP) system implementation projects are notoriously risky. While large-scale ERP cases continue to be developed, relatively few new ERP cases have been published that further ERP implementation education in small to medium size firms. This case details the implementation of a new ERP system in a medium sized…

  16. Malawi faith communities responding to HIV/AIDS: preliminary ...

    African Journals Online (AJOL)

    This paper reports on the preliminary findings (year one) of a four-year intervention and participatory-action research (PAR) project in Malawi. Project goals are to enhance the response capacity and effectiveness of faith community (FC) leaders to the problem of HIV/AIDS. Ethnographic interviews with FC leaders were ...

  17. Project IVOR - Implementing victim-oriented reform of the criminal justice system in the European Union

    NARCIS (Netherlands)

    Biffi, Emanuela; Mulder, Eva; Pemberton, Antony; Santos, Manuela; Valério, Mafalda; Vanfraechem, Inge; van der Vorm, Benny

    2016-01-01

    Project IVOR – Implementing victim-oriented reform of the criminal justice system in the European Union (2014-2016) offers an overview of current research into and with victims’ rights and services, identifying lacunas in the knowledge base and offering a model which can serve to connect experience

  18. Implementation of targeted medication adherence interventions within a community chain pharmacy practice: The Pennsylvania Project.

    Science.gov (United States)

    Bacci, Jennifer L; McGrath, Stephanie Harriman; Pringle, Janice L; Maguire, Michelle A; McGivney, Melissa Somma

    2014-01-01

    To identify facilitators and barriers to implementing targeted medication adherence interventions in community chain pharmacies, and describe adaptations of the targeted intervention and organizational structure within each individual pharmacy practice. Qualitative study. Central and western Pennsylvania from February to April 2012. Rite Aid pharmacists staffed at the 118 Pennsylvania Project intervention sites. Qualitative analysis of pharmacists' perceptions of facilitators and barriers experienced, targeted intervention and organizational structure adaptations implemented, and training and preparation prior to implementation. A total of 15 key informant interviews were conducted from February to April 2012. Ten pharmacists from "early adopter" practices and five pharmacists from "traditionalist" practices were interviewed. Five themes emerged regarding the implementation of targeted interventions, including all pharmacists' need to understand the relationship of patient care programs to their corporation's vision; providing individualized, continual support and mentoring to pharmacists; anticipating barriers before implementation of patient care programs; encouraging active patient engagement; and establishing best practices regarding implementation of patient care services. This qualitative analysis revealed that there are a series of key steps that can be taken before the execution of targeted interventions that may promote successful implementation of medication therapy management in community chain pharmacies.

  19. Texas Pulse Oximetry Project: A Multicenter Educational and Quality Improvement Project for Implementation of Critical Congenital Heart Disease Screening Using Pulse Oximetry.

    Science.gov (United States)

    Guillory, Charleta; Gong, Alice; Livingston, Judith; Creel, Liza; Ocampo, Elena; McKee-Garrett, Tiffany

    2017-07-01

    Objective  Critical congenital heart disease (CCHD) is a leading cause of death in infants. Newborn screening (NBS) by pulse oximetry allows early identification of CCHD in asymptomatic newborns. To improve readiness of hospital neonatal birthing facilities for mandatory screening in Texas, an educational and quality improvement (QI) project was piloted to identify an implementation strategy for CCHD NBS in a range of birthing hospitals. Study Design  Thirteen Texas hospitals implemented standardized CCHD screening by pulse oximetry. An educational program was devised and a tool kit was created to facilitate education and implementation. Newborn nursery nurses' knowledge was assessed using a pre- and posttest instrument. Results  The nurses' knowledge assessment improved from 71 to 92.5% ( p  educational program, including a tool kit, QI processes, and standardized pulse oximetry CCHD NBS, is applicable for a range of hospital birthing facilities and may facilitate wide-scale implementation, thereby improving newborn health. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  20. Competence raising through teaching of ESD environmental key topics implementingproject technology”

    Directory of Open Access Journals (Sweden)

    Gayane Poghosyan

    2015-06-01

    The UNESCO Chair on “Education for Sustainable Development” at the Center for Ecological-Noosphere Studies of the National Academy of Sciences of the Republic of Armenia in cooperation with the National Institute of Education of the Armenian Ministry of Education and Science are carrying out a series of trainings and seminars for educators and students from pedagogical institutes to increase their competence on key environmental topics in the context of sustainable development implementing project method of teaching. Pedagogical-oriented universities and vocational training institutions have been chosen, where trainings and seminars have been carried out with the best students and the teaching staff using project method. In the result of the trainings and seminars 44 teachers and learners from 5 universities, 3 vocational colleges, 5 high schools, 3 NGOs were trained in 3 regions of the Republic of Armenia (with different environmental problems. Evaluations were carried out and the best tested projects were presented at round table discussions.

  1. Learning autonomy in writing class: Implementation of project-based learning in english for spesific purposes

    Science.gov (United States)

    Ayu Sukerti, G. N.; Yuliantini, Ny

    2018-01-01

    This research was aimed to analyze students’ attitude on learning autonomy through the implementation of project-based learning (PBL). Writing has been considered one of the most difficult competencies to master as it incorporates several integrated language skills. Thus, teaching writing in English for Specific Class posts a huge challenge as students often feel discouraged by the complex series of processes involved in producing a well-structured piece of writing. This research implemented PBL as the learning model to boost students’ learning outcomes and construct self-directed learning. Participants were 25 second semester students enrolled in a three-year undergraduate program in Informatics Management. The implementation of PBL in writing class contributed real advantages since it allowed students to collaboratively arrange outline in order to produce individual drafts and final essays. The study revealed that students were able to be involved in a more deep and autonomous learning as they helped each other during group discussion. The students autonomously engaged in the completion of the project in a more positive attitude. They also acquired more knowledge in the aspect of grammar and learned how to use language in proper context based on the feedbacks they got during revising their writing.

  2. Implementing the patient-centered medical home in residency education.

    Science.gov (United States)

    Doolittle, Benjamin R; Tobin, Daniel; Genao, Inginia; Ellman, Matthew; Ruser, Christopher; Brienza, Rebecca

    2015-01-01

    In recent years, physician groups, government agencies and third party payers in the United States of America have promoted a Patient-centered Medical Home (PCMH) model that fosters a team-based approach to primary care. Advocates highlight the model's collaborative approach where physicians, mid-level providers, nurses and other health care personnel coordinate their efforts with an aim for high-quality, efficient care. Early studies show improvement in quality measures, reduction in emergency room visits and cost savings. However, implementing the PCMH presents particular challenges to physician training programs, including institutional commitment, infrastructure expenditures and faculty training. Teaching programs must consider how the objectives of the PCMH model align with recent innovations in resident evaluation now required by the Accreditation Council of Graduate Medical Education (ACGME) in the US. This article addresses these challenges, assesses the preliminary success of a pilot project, and proposes a viable, realistic model for implementation at other institutions.

  3. Evaluation of the Strategy Management Implementation in Project- Oriented Service Organizations

    Directory of Open Access Journals (Sweden)

    Abolfazl Sherafat

    2014-02-01

    Full Text Available Although developing strategic and operational plans is a difficult and complicated process, their successful implementation is much more difficult. Many organizations fail in the full implementation of their strategies. This is not due to the partial definition of strategies and organization‘s operational plan, but this is likely due to the lack of strong framework for creating alignment between employees and operational process and the organizational goals. To implement strategies effectively and to develop a comprehensive management system and to improve the performance, Robert Kaplan and David Norton introduced a modern management system which is Balanced ScoreCard. Likewise they introduced five main criteria: leadership, translation, alignment, every day process and ongoing process for a strategy oriented organization. This paper is intended to offer a systematic approach for measuring the effectiveness and efficiency of the strategic plan performance. For this study the questionnaire was distributed in a project- orientated service organization and after collection, by the use of statistical. Analysis especially factor analysis the grouping of sub-criteria under the five main criteria was confirmed. The statistical analysis showed that, two criteria of alignment and every day work had the lowest scores in terms of both implementation and effectiveness in the organization‘s senior and executive manager‘s point of view. With deep interview, studying of scorecards and meeting of the strategic committee of the studied organization, the two dimension of alignment and every day work were further examined and after identifying upgradeable areas, some suggestions for improving the effectiveness and efficiency of the studied organization were presented.

  4. Implementing pharmacogenomics decision support across seven European countries: The Ubiquitous Pharmacogenomics (U-PGx) project.

    Science.gov (United States)

    Blagec, Kathrin; Koopmann, Rudolf; Crommentuijn-van Rhenen, Mandy; Holsappel, Inge; van der Wouden, Cathelijne H; Konta, Lidija; Xu, Hong; Steinberger, Daniela; Just, Enrico; Swen, Jesse J; Guchelaar, Henk-Jan; Samwald, Matthias

    2018-02-09

    Clinical pharmacogenomics (PGx) has the potential to make pharmacotherapy safer and more effective by utilizing genetic patient data for drug dosing and selection. However, widespread adoption of PGx depends on its successful integration into routine clinical care through clinical decision support tools, which is often hampered by insufficient or fragmented infrastructures. This paper describes the setup and implementation of a unique multimodal, multilingual clinical decision support intervention consisting of digital, paper-, and mobile-based tools that are deployed across implementation sites in seven European countries participating in the Ubiquitous PGx (U-PGx) project. © The Author(s) 2018. Published by Oxford University Press on behalf of the American Medical Informatics Association.

  5. Use of the Theoretical Domains Framework to evaluate factors driving successful implementation of the Accelerated Chest pain Risk Evaluation (ACRE) project.

    Science.gov (United States)

    Skoien, Wade; Page, Katie; Parsonage, William; Ashover, Sarah; Milburn, Tanya; Cullen, Louise

    2016-10-12

    The translation of healthcare research into practice is typically challenging and limited in effectiveness. The Theoretical Domains Framework (TDF) identifies 12 domains of behaviour determinants which can be used to understand the principles of behavioural change, a key factor influencing implementation. The Accelerated Chest pain Risk Evaluation (ACRE) project has successfully translated research into practice, by implementing an intervention to improve the assessment of low to intermediate risk patients presenting to emergency departments (EDs) with chest pain. The aims of this paper are to describe use of the TDF to determine which factors successfully influenced implementation and to describe use of the TDF as a tool to evaluate implementation efforts and which domains are most relevant to successful implementation. A 30-item questionnaire targeting clinicians was developed using the TDF as a guide. Questions encompassed ten of the domains of the TDF: Knowledge; Skills; Social/professional role and identity; Beliefs about capabilities; Optimism; Beliefs about consequences; Intentions; Memory, attention and decision processes; Environmental context and resources; and Social influences. Sixty-three of 176 stakeholders (36 %) responded to the questionnaire. Responses for all scales showed that respondents were highly favourable to all aspects of the implementation. Scales with the highest mean responses were Intentions, Knowledge, and Optimism, suggesting that initial education and awareness strategies around the ACRE project were effective. Scales with the lowest mean responses were Environmental context and resources, and Social influences, perhaps highlighting that implementation planning could have benefitted from further consideration of the factors underlying these scales. The ACRE project was successful, and therefore, a perfect case study for understanding factors which drive implementation success. The overwhelmingly positive response suggests that it

  6. Preliminary Test for Constitutive Models of CAP

    Energy Technology Data Exchange (ETDEWEB)

    Choo, Yeon Joon; Hong, Soon Joon; Hwang, Su Hyun; Lee, Keo Hyung; Kim, Min Ki; Lee, Byung Chul [FNC Tech., Seoul (Korea, Republic of); Ha, Sang Jun; Choi, Hoon [Korea Electric Power Research Institute, Daejeon (Korea, Republic of)

    2010-05-15

    The development project for the domestic design code was launched to be used for the safety and performance analysis of pressurized light water reactors. As a part of this project, CAP (Containment Analysis Package) code has been developing for the containment safety and performance analysis side by side with SPACE. The CAP code treats three fields (vapor, continuous liquid and dispersed drop) for the assessment of containment specific phenomena, and is featured by assessment capabilities in multi-dimensional and lumped parameter thermal hydraulic cell. Thermal hydraulics solver was developed and has a significant progress now. Implementation of the well proven constitutive models and correlations are essential in other for a containment code to be used with the generalized or optimized purposes. Generally, constitutive equations are composed of interfacial and wall transport models and correlations. These equations are included in the source terms of the governing field equations. In order to develop the best model and correlation package of the CAP code, various models currently used in major containment analysis codes, such as GOTHIC, CONTAIN2.0 and CONTEMPT-LT are reviewed. Several models and correlations were incorporated for the preliminary test of CAP's performance and test results and future plans to improve the level of execution besides will be discussed in this paper

  7. Preliminary Test for Constitutive Models of CAP

    International Nuclear Information System (INIS)

    Choo, Yeon Joon; Hong, Soon Joon; Hwang, Su Hyun; Lee, Keo Hyung; Kim, Min Ki; Lee, Byung Chul; Ha, Sang Jun; Choi, Hoon

    2010-01-01

    The development project for the domestic design code was launched to be used for the safety and performance analysis of pressurized light water reactors. As a part of this project, CAP (Containment Analysis Package) code has been developing for the containment safety and performance analysis side by side with SPACE. The CAP code treats three fields (vapor, continuous liquid and dispersed drop) for the assessment of containment specific phenomena, and is featured by assessment capabilities in multi-dimensional and lumped parameter thermal hydraulic cell. Thermal hydraulics solver was developed and has a significant progress now. Implementation of the well proven constitutive models and correlations are essential in other for a containment code to be used with the generalized or optimized purposes. Generally, constitutive equations are composed of interfacial and wall transport models and correlations. These equations are included in the source terms of the governing field equations. In order to develop the best model and correlation package of the CAP code, various models currently used in major containment analysis codes, such as GOTHIC, CONTAIN2.0 and CONTEMPT-LT are reviewed. Several models and correlations were incorporated for the preliminary test of CAP's performance and test results and future plans to improve the level of execution besides will be discussed in this paper

  8. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  9. State and Federal project development procedures for bus rapid transit : managing differences and reducing implementation delays

    Science.gov (United States)

    2011-08-01

    This report documents an investigation into the transportation project development process in the : context of the implementation of bus rapid transit systems on the State Highway System as well as such : systems being part of the Federal New Starts ...

  10. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  11. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit Applications Accepted.... On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9 Hydroelectric, LLC filed preliminary permit...-2822. Solia 9 Hydroelectric's proposed Lock and Dam 15 Hydropower Project (Project No. 13827-000) would...

  12. Development and assessment of an active strategy for the implementation of a collaborative care approach for depression in primary care (the INDI·i project).

    Science.gov (United States)

    Aragonès, Enric; Palao, Diego; López-Cortacans, Germán; Caballero, Antonia; Cardoner, Narcís; Casaus, Pilar; Cavero, Myriam; Monreal, José Antonio; Pérez-Sola, Víctor; Cirera, Miquel; Loren, Maite; Bellerino, Eva; Tomé-Pires, Catarina; Palacios, Laura

    2017-12-13

    Primary care is the principal clinical setting for the management of depression. However, significant shortcomings have been detected in its diagnosis and clinical management, as well as in patient outcomes. We developed the INDI collaborative care model to improve the management of depression in primary care. This intervention has been favorably evaluated in terms of clinical efficacy and cost-effectiveness in a clinical trial. Our aim is to bring this intervention from the scientific context into clinical practice. Objective: To test for the feasibility and impact of a strategy for implementing the INDI model for depression in primary care. A quasi-experiment conducted in primary care. Several areas will be established to implement the new program and other, comparable areas will serve as control group. The study constitutes the preliminary phase preceding generalization of the model in the Catalan public healthcare system. The target population of the intervention are patients with major depression. The implementation strategy will also involve healthcare professionals, primary care centers, as well as management departments and the healthcare organization itself in the geographical areas where the study will be conducted: Camp de Tarragona and Vallès Occidental (Catalonia). The INDI model is a program for improving the management of depression involving clinical, instructional, and organizational interventions including the participation of nurses as care managers, the efficacy and efficiency of which has been proven in a clinical trial. We will design an active implementation strategy for this model based on the PARIHS (Promoting Action on Research Implementation in Health Services) framework. Qualitative and quantitative measures will be used to evaluate variables related to the successful implementation of the model: acceptability, utility, penetration, sustainability, and clinical impact. This project tests the transferability of a healthcare intervention

  13. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  14. The influence of learning context of implementation intentions over the increase in fruit consumption: Preliminary results from a pilot study

    Directory of Open Access Journals (Sweden)

    Roxana Păcurar

    2016-12-01

    Full Text Available The present research is aiming to investigate the influence of the context of learning implementation intentions over the efficiency of the intervention. 73 participants enrolled for participation in this study. They learned a behavioral self-regulation strategy meant to help them implement their intentions to increase fruit consumption. The participants were randomized in one of the three experimental conditions: ego-depletion, control, hopelessness. All the participants, regardless of the experimental condition they were assigned to, where given a presentation on implementation intentions. They all designed "if-then" plans to increase fruit consumption. The pretest results concerning fruit consumption within the 48 hours before participation showed that approximately half of the participants already eat more than three fruits within the last 48 hours before pretest. Hence we decided to exclude them from the analysis, because they would benefit less from implementing an implementation intention strategy as they are already eating at least two fruits / day as a minimum intake. The preliminary analyses made on the retained sample showed that there are no significant differences between the three experimental conditions regarding a change in quantity, calories or pieces of fruit from fruit intake. Even though the results are not statistically significant, in this pilot study we have noticed a descriptive trend suggesting that the ego-depletion effect might be less intense and transitory because the fruit intake (quantity, calories and pieces, at 96 hours after the experiment, seems to be almost the same as it was in pretest.

  15. Pilot Implementations

    DEFF Research Database (Denmark)

    Manikas, Maria Ie

    by conducting a literature review. The concept of pilot implementation, although commonly used in practice, is rather disregarded in research. In the literature, pilot implementations are mainly treated as secondary to the learning outcomes and are presented as merely a means to acquire knowledge about a given...... objective. The prevalent understanding is that pilot implementations are an ISD technique that extends prototyping from the lab and into test during real use. Another perception is that pilot implementations are a project multiple of co-existing enactments of the pilot implementation. From this perspective......This PhD dissertation engages in the study of pilot (system) implementation. In the field of information systems, pilot implementations are commissioned as a way to learn from real use of a pilot system with real data, by real users during an information systems development (ISD) project and before...

  16. Implementing CDM projects. A guidebook to host country legal issues; CDM - Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Curnow, P [Baker and McKenzie, London (United Kingdom); Hodes, G [UNEP Risoe Centre on Energy, Climate and Sustainable Development, DTU, Roskilde (Denmark)

    2009-08-15

    The Clean Development Mechanism (CDM) continues to evolve organically, and many legal issues remain to be addressed in order to maximise its effectiveness. This Guidebook explains through case studies how domestic laws and regulatory frameworks in CDM Host Countries interact with international rules on carbon trading, and how the former can be enhanced to facilitate the implementation and financing of CDM projects. (author)

  17. Implementation of an education development project in pathology to improve student competency-lessons learnt.

    Science.gov (United States)

    Negi, Gita; Harsh, Meena; Chauhan, Vijendra D; Kalra, Vinita; Agarwal, Pradeep; Kusum, Anuradha

    2015-08-01

    Basic medical sciences and clinical teachings are not coordinated in the present medical education system. They are not taught keeping in mind the outcomes required at the time of actual handling of patients in the community. An educational development project was implemented in the Department of Pathology with the aim that it will result in the student learning to link the pathophysiology of the disease to clinical scenarios and become fully competent for lifelong medical practice. The pathology teaching of the second professional batch was modified by starting with defining the desired outcomes/competencies in the student's knowledge, skills, and attitude which were then addressed by lectures, demonstrations, practical classes and small group activities where case scenarios and laboratory reports were included. The outcome was assessed by Objectively Structured Clinical/Practical Examination and multiple choice questions. Force field analysis, faculty and student interviews, and questionnaires were used to assess the factors affecting its implementation and impact. Totally 80 students of the 2(nd) Professional MBBS were exposed to a competency-based education development project. It was found that the system was appreciated by faculty and students, especially the integration with clinical scenarios. There were many factors which influenced the execution of this program, including motivation level of students and faculty, time, logistics and meticulous planning. There was a significant improvement in student's performance and satisfaction. Many factors including prior planning were a major determinant for the success of this education development project.

  18. Analysing Implementation of the European Standards and Guidelines for Quality Assurance at Institutional Level : Outcomes of the IBAR Project

    NARCIS (Netherlands)

    Westerheijden, Donald F.; Kohoutek, Jan

    2013-01-01

    The IBAR project studied barriers higher education institutions experienced to implementing the ESG part 1. Our paper reports on the major findings of this project. After sketching our conceptual approach, we conclude that the ESG Part 1 seem to be functioning as a codification of many policies and

  19. Implementing Brief Interventions in Health Care: Lessons Learned from the Swedish Risk Drinking Project

    Directory of Open Access Journals (Sweden)

    Per Nilsen

    2011-09-01

    Full Text Available The Risk Drinking Project was a national implementation endeavour in Sweden, carried out from 2004 to 2010, based on a government initiative to give alcohol issues a more prominent place in routine primary, child, maternity and occupational health care. The article describes and analyses the project. Critical factors that were important for the results are identified. The magnitude of the project contributed to its reach and impact in terms of providers’ awareness of the project goals and key messages. The timing of the project was appropriate. The increase in alcohol consumption in Sweden and diminished opportunities for primary prevention strategies since entry to the European Union in 1995 have led to increased expectations for health care providers to become more actively involved in alcohol prevention. This awareness provided favourable conditions for this project. A multifaceted approach was used in the project. Most educational courses were held in workshops and seminars to encourage learning-by-doing. Motivational interviewing was an integral aspect. The concept of risk drinking was promoted in all the activities. Subprojects were tailored to the specific conditions of each respective setting, building on the skills the providers already had to modify existing work practices. Nurses were afforded a key role in the project.

  20. Partitioning planning studies: Preliminary evaluation of metal and radionuclide partitioning the high-temperature thermal treatment systems

    International Nuclear Information System (INIS)

    Liekhus, K.; Grandy, J.; Chambers, A.

    1997-03-01

    A preliminary study of toxic metals and radionuclide partitioning during high-temperature processing of mixed waste has been conducted during Fiscal Year 1996 within the Environmental Management Technology Evaluation Project. The study included: (a) identification of relevant partitioning mechanisms that cause feed material to be distributed between the solid, molten, and gas phases within a thermal treatment system; (b) evaluations of existing test data from applicable demonstration test programs as a means to identify and understand elemental and species partitioning; and, (c) evaluation of theoretical or empirical partitioning models for use in predicting elemental or species partitioning in a thermal treatment system. This preliminary study was conducted to identify the need for and the viability of developing the tools capable of describing and predicting toxic metals and radionuclide partitioning in the most applicable mixed waste thermal treatment processes. This document presents the results and recommendations resulting from this study that may serve as an impetus for developing and implementing these predictive tools

  1. Partitioning planning studies: Preliminary evaluation of metal and radionuclide partitioning the high-temperature thermal treatment systems

    Energy Technology Data Exchange (ETDEWEB)

    Liekhus, K.; Grandy, J.; Chambers, A. [and others

    1997-03-01

    A preliminary study of toxic metals and radionuclide partitioning during high-temperature processing of mixed waste has been conducted during Fiscal Year 1996 within the Environmental Management Technology Evaluation Project. The study included: (a) identification of relevant partitioning mechanisms that cause feed material to be distributed between the solid, molten, and gas phases within a thermal treatment system; (b) evaluations of existing test data from applicable demonstration test programs as a means to identify and understand elemental and species partitioning; and, (c) evaluation of theoretical or empirical partitioning models for use in predicting elemental or species partitioning in a thermal treatment system. This preliminary study was conducted to identify the need for and the viability of developing the tools capable of describing and predicting toxic metals and radionuclide partitioning in the most applicable mixed waste thermal treatment processes. This document presents the results and recommendations resulting from this study that may serve as an impetus for developing and implementing these predictive tools.

  2. A system dynamics evaluation model: implementation of health information exchange for public health reporting.

    Science.gov (United States)

    Merrill, Jacqueline A; Deegan, Michael; Wilson, Rosalind V; Kaushal, Rainu; Fredericks, Kimberly

    2013-06-01

    To evaluate the complex dynamics involved in implementing electronic health information exchange (HIE) for public health reporting at a state health department, and to identify policy implications to inform similar implementations. Qualitative data were collected over 8 months from seven experts at New York State Department of Health who implemented web services and protocols for querying, receipt, and validation of electronic data supplied by regional health information organizations. Extensive project documentation was also collected. During group meetings experts described the implementation process and created reference modes and causal diagrams that the evaluation team used to build a preliminary model. System dynamics modeling techniques were applied iteratively to build causal loop diagrams representing the implementation. The diagrams were validated iteratively by individual experts followed by group review online, and through confirmatory review of documents and artifacts. Three casual loop diagrams captured well-recognized system dynamics: Sliding Goals, Project Rework, and Maturity of Resources. The findings were associated with specific policies that address funding, leadership, ensuring expertise, planning for rework, communication, and timeline management. This evaluation illustrates the value of a qualitative approach to system dynamics modeling. As a tool for strategic thinking on complicated and intense processes, qualitative models can be produced with fewer resources than a full simulation, yet still provide insights that are timely and relevant. System dynamics techniques clarified endogenous and exogenous factors at play in a highly complex technology implementation, which may inform other states engaged in implementing HIE supported by federal Health Information Technology for Economic and Clinical Health (HITECH) legislation.

  3. IMPROVING THE PROVISION OF STATE GUARANTEES UNDER CREDITS OR BONDED LOANS RAISED FOR INVESTMENT PROJECTS IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Lola D. Sanginova

    2015-01-01

    Full Text Available Importance: Under current conditions, the Russian economy needs investment resources to ensure sustainable social and economic development. One of instruments of state-financing backing that can be used to support capital intensive, economically viable, financially and socially efficient investment projects that create "growing points" are state guarantees of theRussian Federation.Objective: The objective of this study is to identify possible ways to improve the requirements and procedures of providing state guarantees of theRussian Federationwhich contribute to the increase in the quantity and quality of investment projects of high social importance. Methods: Through the use of general scientific methods, analysis and synthesis, induction and deduction the possibility of creating a more attractive environment for principals is analyzed, measures to reduce the risk for public legal entities in providing state guarantees of theRussian Federationunder credits or bonded loans raised for investment projects implementation.Results: Principles of state guarantee support that ensure the interests of both the principals and the guarantor are defined. The basic directions for improving the mechanism how state guarantees of theRussian Federationsupport investment projects are justified. These directions include increasing availability of obtaining state guarantee support by lowering the cost of investment projects for which the state guarantees may be provided; reducing time of decision making on granting a state guarantee; increasing the creditors’ responsibility for a qualitative assessment of the creditworthiness of principals and investment projects; changing the methodology for assessing the social efficiency of investment projects; increasing the information transparency of provided state guarantees of the Russian Federation.Conclusions: The main result of this study is that under current conditions of economic turbulence state guarantees of the

  4. THE FEATURES OF THE PROCEDURE FOR MAKING THE DECISION ON THE IMPLEMENTATION OF PROJECTS THE PUBLIC-PRIVATE PARTNERSHIP

    Directory of Open Access Journals (Sweden)

    M. Vorobiova

    2018-01-01

    Full Text Available The procedure for making a decision on the implementation of public-private partnership, which has developed in Ukraine was examined in the article. Three consecutive stages of preparation for the implementation of projects of partnership between the state and business were сomprehensively considered. The main disadvantages of each stage were determined and suggestions for their improvement were given.

  5. Model for Calculating the Maximum Permissible Tax Burden in Amur Region in the Context of the Implementation of Largest Investment Projects

    OpenAIRE

    Viktor Vladimirovich Ivanov; Maria Olegovna Kakaulina; Oleg Anatolievich Tsepelev

    2018-01-01

    According to the Government of the Amur region, tax collection from the implementation of investment projects was tightly controlled from 2016, because of the region’s high debt load. This situation requires assessing the acceptability of the level of regional tax burden for business entities. The purpose of this paper is to develop a model for assessing the level of regional tax burden, taking into account the implementation of the largest investment projects in the territory. The m...

  6. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR section 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents

  7. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  8. Implementing the Project Approach: A Case Study of Hybrid Pedagogy in a Hong Kong Kindergarten

    Science.gov (United States)

    Chen, Jennifer J.; Li, Hui; Wang, Jing-ying

    2017-01-01

    The Project Approach has been promoted in Hong Kong kindergartens since the 1990s. However, the dynamic processes and underlying mechanisms involved in the teachers' implementation of this pedagogical method there have not yet been fully investigated. This case study of one typical kindergarten in Hong Kong documented how and why eight teachers…

  9. Enron and Totalfina enter the Dolphin project

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The UAE Offsets Group Office (UOG), responsible for developing alliances between the private sector of the United Arab Emirates and international companies, announced on 1. March that a strategic partnership has been established with Enron and TotalFina Elf for implementation of the Dolphin Project, one of the largest world-wide integrated initiatives in the energy sector. The First objective of this partnership, the life of which has been fixed at 25 years, will be to develop the Dolphin infrastructure through a new gas pipeline with a capacity of 85 million cu.m of gas per day, linking Qatar to Abu Dhabi and the Sultanate of Oman. This initial phase will be based on the development of activities all along the gas line. The Project Development Agreement (PDA) concluded by the UOG, Enron and Elf also includes the exploitation of other opportunities in the Gulf countries and the region. The UOG will hold a majority share of 51% in this partnership, the remaining 49% being shared equally between Enron and Elf. Construction work on the gas pipeline and the various installations upstream of Qatar should be quickly put in hand. A series of preliminary agreements concluded with the government authorities of Qatar, Abu Dhabi, Dubai, Oman and Pakistan, relating to the procurement and sale of gas, has enabled the implementation of the geographical and political organisation necessary to realize the Dolphin Project. (author)

  10. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    Energy Technology Data Exchange (ETDEWEB)

    Benoît, Fabrice, E-mail: fabrice-2.benoit@cea.fr [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Allegretti, Ludovic [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Aumeunier, Marie-Hélène [OPTIS, ZE de La Farlède, F-83078 Toulon Cedex 9 (France); Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Robert, Julien [SOFYNE, F-69800 Saint Priest (France)

    2014-10-15

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule.

  11. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    International Nuclear Information System (INIS)

    Benoît, Fabrice; Allegretti, Ludovic; Aumeunier, Marie-Hélène; Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène; Robert, Julien

    2014-01-01

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule

  12. Seismic microzoning projects and their implementation in Venezuela

    Science.gov (United States)

    Schmitz, M.; Cano, V.; Olbrich, F.; Vallee, M.; Morales, C.; Arreaza, A.; Mendes, K.; Klarica, S.; Alvarez Gomez, J.; Aray, J.; Vielma, J.; Pombo, A.; Diaz, J.; Grupo de trabajo

    2013-05-01

    Site effects have been recognized to play an important role in damage distribution of destructive earthquakes. These effects have been observed in Venezuela especially during the 1967 Caracas earthquake, when 4 buildings with 10 and more storeys during the Caracas 1967 earthquake collapsed, and a big number of them in the same deep sediment area have been seriously damaged. This motivated the development of studies regarding the subsurface configuration of Caracas and Barquisimeto during the last decade, with a seismic microzoning project realized in both cities from 2005 to 2009. The main results of this project were the development of design response spectra for the different microzones within the sedimentary basin, as well as estimates of landslide hazard. Implementation of the results in municipality ordinances is actually discussed with local authorities. They are aimed to address mitigation for new constructions by the application of the specific design spectra, for existing buildings via evaluation and retrofitting strategies, and for slope areas (informal, as well as formal developments) due to the identification of areas that may not be developed or require detailed studies of slope stabilities. Since then, seismic microzoning studies were started in Cumaná, Guarenas/Guatire and Lara state, and within a broader context of integrated risk management, which includes flooding, landslide and technological risks, in Mérida, Valencia, Maracay, Barcelona/Puerto La Cruz and Valle de la Pascua. The projects are coordinated by the Venezuelan Foundation for Seismological Research (FUNVISIS) in cooperation with local universities. Efforts are done to unable local researchers to apply the methodologies in other cities as Valera, Trujillo, Boconó, San Cristóbal and Tucacas. A unified seismic hazard map as input motion to these studies is actually in development. Depending on the local characteristics, building inventory and vulnerability analysis are done for risk

  13. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    International Nuclear Information System (INIS)

    Chareyron, Bruno

    2012-01-01

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 μSv/h compared to 0.15 μSv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  14. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    Energy Technology Data Exchange (ETDEWEB)

    Chareyron, Bruno

    2012-04-05

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 {mu}Sv/h compared to 0.15 {mu}Sv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  15. Blue ocean strategy application in the course of planning and implementation of construction projects in the area of SMART housing and social infrastructure

    Directory of Open Access Journals (Sweden)

    Orlov Alexandr K.

    2017-01-01

    Full Text Available This paper deals with approaches to the analysis of competitiveness in the construction field. The methodology of blue ocean strategy was analyzed. Based on the conducted analysis a set of measures related to blue ocean strategy application in the course of planning and implementation of construction projects in the area of SMART housing and social infrastructure was developed. Implementation of the proposed methodological provisions will allow improving investment efficiency in the course of construction projects implementation and enhancing the competitive ability of the developer.

  16. Conditions That Support the Implementation of E-Government through the Digital Towpath Project: An Exploratory Study

    Science.gov (United States)

    Tyksinski, Deborah J.

    2009-01-01

    This study examined the social environmental conditions perceived by local government representatives as relatively important for their implementation of e-government using the Digital Towpath Project (DTP) content management system, referred to as "websites". The survey population included individuals who administered the municipal websites for…

  17. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    Science.gov (United States)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  18. Establishing support groups for HIV-infected women: using experiences to develop guiding principles for project implementation.

    Science.gov (United States)

    Visser, Maretha J; Mundell, Jonathan P

    2008-07-01

    HIV-infected women need support to deal with their diagnosis as well as with the stigma attached to HIV. As part of their practical training, Master's-level psychology students negotiated with the staff of four clinics in townships in Tshwane, South Africa, to establish support groups for HIV+ women and offered to assist them in facilitating the groups. This study aimed to understand why the implementation of groups was successful in one clinic and not other clinics. The student reports on their experiences and interaction with clinic staff and clients were used as sources of data. Using qualitative data analysis, different dynamics and factors that could affect project implementation were identified in each clinic. The socio-ecological and systems theories were used to understand implementation processes and obstacles in implementation. The metaphor of building a bridge over a gorge was used to describe the different phases in and obstacles to the implementation of the intervention. Valuable lessons were learnt, resulting in the development of guiding principles for the implementation of support groups in community settings.

  19. Preliminary radiation shielding design for BOOMERANG

    International Nuclear Information System (INIS)

    Donahue, Richard J.

    2002-01-01

    Preliminary radiation shielding specifications are presented here for the 3 GeV BOOMERANG Australian synchrotron light source project. At this time the bulk shield walls for the storage ring and injection system (100 MeV Linac and 3 GeV Booster) are considered for siting purposes

  20. 49 CFR 611.13 - Overall project ratings.

    Science.gov (United States)

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION... to enter into preliminary engineering, final design, or FFGAs. (c) These ratings will be used to: (1) approve advancement of a proposed project into preliminary engineering and final design; (2) Approve...

  1. Implementation of Metal Casting Best Practices

    Energy Technology Data Exchange (ETDEWEB)

    Eppich, Robert [Eppich Technologies, Syracuse, IN (United States); Naranjo, Robert D. [BCS, Inc., Laurel, MD (United States)

    2007-01-01

    The project examined cases where metal casters had implemented ITP research results and the benefits they received due to that implementation. In cases where casters had not implemented those results, the project examined the factors responsible for that lack of implementation. The project also informed metal casters of the free tools and service offered by the ITP Technology Delivery subprogram.

  2. The Implementation of Transportation and Transit Projects on the Basis of Public-Private Partnership in Russia

    Directory of Open Access Journals (Sweden)

    Valery Anatolyevich Tsevtkov

    2016-12-01

    Full Text Available The article considers the main directions of the implementation of the current transportation and transit projects on the basis of the institution of public-private partnership in Russia. This work is a continuation of the study of the theory and practice of the application of public-private partnership in the investment projects aimed at the development and realization of the transportation and transit potential of the country. On the methodological basis of evolutionary and institutional economics, historical approach, system-oriented analysis and the theory of firms, the main current projects for the development of Russian transportation and transit system using public-private partnership are considered. They are the construction of a high-speed line of Moscow — Kazan with subsequent extension to the Chinese border; functioning of the transport and logistics in the Chelyabinsk region; infrastructure of transit cargo by Northern Sea Route; participation of foreign investors in the development of Russian seaports and sea gates. It is shown that the competitive advantage of transit traffic by a particular route requires more traversing speed of cargo with a minimum of stops, handling and overloads in the way. Revenue from transportation and transit potential implementation can be comparable to the size of the resource rent in the case of the development in Russia of the production and transit sector of the economy, and not only of a transit one . In this regard, the emphasis is placed on the determination of the possibility and necessity of organizational changes associated with the development of a large public-private transportation company, able to compete with global sea container services of the route of Asia — Europe. The main directions and activities under the proposed national project «Development of transit economy in Russia: Uniting Eurasia» and its subprogram «Creation of innovative rolling stock for container and multimodal

  3. An evaluation of the total quality management implementation strategy for the advanced solid rocket motor project at NASA's Marshall Space Flight Center. M.S. Thesis - Tennessee Univ.

    Science.gov (United States)

    Schramm, Harry F.; Sullivan, Kenneth W.

    1991-01-01

    An evaluation of the NASA's Marshall Space Flight Center (MSFC) strategy to implement Total Quality Management (TQM) in the Advanced Solid Rocket Motor (ASRM) Project is presented. The evaluation of the implementation strategy reflected the Civil Service personnel perspective at the project level. The external and internal environments at MSFC were analyzed for their effects on the ASRM TQM strategy. Organizational forms, cultures, management systems, problem solving techniques, and training were assessed for their influence on the implementation strategy. The influence of ASRM's effort was assessed relative to its impact on mature projects as well as future projects at MSFC.

  4. Guia de ideas para la Planificacion y Aplicacion de Proyectos Intergeneracionales (Guide of Ideas for Planning and Implementing Intergenerational Projects)

    Science.gov (United States)

    Pinto, Teresa Almeida; Marreel, Iris; Hatton-Yeo, Alan

    2009-01-01

    This version of "Guide of Ideas for Planning and Implementing Intergenerational Projects," written in Spanish, is for all professionals that are or wish to be enrolled in the development of intergenerational activities. This "Guide" is the main product of the Project MATES--Mainstreaming Intergenerational Solidarity,…

  5. Preliminary I&C Design for LORELEI

    International Nuclear Information System (INIS)

    Korotkin, S.; Kaufman, Y.; Guttmann, E. B.; Levy, S.; Amidan, D.; Gdalyho, B.; Cahana, T.; Ellenbogen, A.; Arad, M.; Weiss, Y.; Sasson, A.; Ferry, L.; Bourrelly, F.; Cohen, Y.

    2014-01-01

    This document summarizes the preliminary I&C design for LORELEI experiment The preliminary design deals with considerations regarding appropriate safety and service instrumentation. The determined closed loop control rules for temperature and position will be implemented in the detailed design. The Computer Aided Operator Decisions System (CAODS) will be used for prediction of hot spot temperature and thickness of oxidation layer using Baker-Just correlation. The proposed hybrid simulation system comprising of both virtual and real hardware will be in-cooperated for LORELEI verification. It will perform both integration cold tests for a partial hardware loop and virtual tests for the final I&C design

  6. ERP system implementation costs and selection factors of an implementation approach

    DEFF Research Database (Denmark)

    Johansson, Björn; Sudzina, Frantisek; Newman, Mike

    2011-01-01

    , which influence the implementation approach in an ERP project, cause also an increase of the project cost in a European context? Our survey was conducted in Denmark, Slovakia and Slovenia and focused on this issue. Our main findings are that: 1) the number of implemented modules influences selection......Different approaches on implementation of enterprise resource planning (ERPs) systems exist. In this article, we investigate relationship between factors influencing selection of implementation approach and companies' ability to stay within budget when implementing ERPs. The question is: do factors...... of an implementation approach; 2) companies with information strategies are more likely to stay within budget regarding ERP systems implementation. However, we also found that: 3) implementation approach does not significantly influence ability to stay within budget; 4) a clear relationship between factors influencing...

  7. Method of computer generation and projection recording of microholograms for holographic memory systems: mathematical modelling and experimental implementation

    International Nuclear Information System (INIS)

    Betin, A Yu; Bobrinev, V I; Evtikhiev, N N; Zherdev, A Yu; Zlokazov, E Yu; Lushnikov, D S; Markin, V V; Odinokov, S B; Starikov, S N; Starikov, R S

    2013-01-01

    A method of computer generation and projection recording of microholograms for holographic memory systems is presented; the results of mathematical modelling and experimental implementation of the method are demonstrated. (holographic memory)

  8. Implementation of the Hungarian RW management project: Results and lessons

    International Nuclear Information System (INIS)

    Vigassy, J.; Czoch, I.; Ormai, P.

    1995-01-01

    In 1993, a National RW Management Project was launched to solve handling and disposal of LLW/ILW of the Paks Nuclear Power Plant and to elaborate a complex strategy for the management of radwastes from the NPP, including HLW, spent fuel and wastes from the decommissioning. It was intended to implement the project so as to have selected the possible site (or sites) for the LLW/ILW waste repository by 1996. This paper describes the first results of the nation-wide screening for suitable areas and the problems related to the comparative evaluation process to select potential sites for a surface or geological LLW/ILW disposal facility. International tenders were issued to find the most appropriate technology to reduce the quantity of liquid and solid radwaste in the Nuclear Power Plant. Their results will provide a better basis for planning the characteristics and quantity of radwaste. The applications revealed that supercompacting can be ordered as a service when the need arises, and thus it was possible to re-allocate the funding originally foreseen for the equipment to treat solid wastes. Great importance is attached in the Project to public acceptance and PR activity. An expert organization was selected in a two-phase bidding process, and it was decided that detailed exploration of a potential site will take place only if public acceptance is assured. The original program of the Hungarian RW Management Project was extended in 1994 to perform on-site underground investigations (with Canadian support) in a silt-stone formation. The first results confirm that this is a potential site for deep geological disposal of HLW. The financial and legal framework of the RW management is also to be solved. The new law on nuclear energy -- now in preparation -- will deal with that problem in one of its most important chapters, defining the responsibilities for RW management and the sources of funding

  9. The Preliminary Research for Implementation of Improved DTC Scheme of High Performance PMSM Drives

    Directory of Open Access Journals (Sweden)

    Tole Sutikno

    2008-12-01

    Full Text Available The direct torque control (DTC is one of control approache that is used commonly in PMSM control system. This method supports a very quick and precise torque response. However, the DTC method is not perfect and has some disadvantages. Many researchers have been proposed to modify the basic DTC scheme for PMSM drive. All this contributions allow performance to be improved, but at the same time they lead to more complex schemes. Furthermore, the PMSM drive control systems are usually based on microcontroller and DSP. Some researchers also have been used DSP and FPGA together to develop DTC for AC drives. These allow improving the performance, but they will increase cost. For the reason above, this paper proposed a new DTC scheme to apply only based on FPGA. The preliminary research showed that the proposed DTC sheme can reduce torque and flux ripples significantly. Therefore, this paper also recomend to realize proposed DTC scheme based on FPGA in order to support to execute very fast computation.The implementation is hoped that it will very potential to replace not only the induction motor but also the DC servo motor in a number of industrial process, commercial, domestic and modern military applications of high-performance drive.

  10. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  11. Implementation of manufacturing data management application in the scientific research project. Case: CERN, the European Organization for Nuclear Research

    CERN Document Server

    Saifoulina, Margarita

    2010-01-01

    This Bachelor’s thesis examined the implementation process of an MTF (Manufacturing and Test Folder) application in the CLIC (Compact Linear Collider) Radio Frequency Structure Development project for manufacturing data management purposes. The primary goal of the study was to investigate how MTF implementation and its integration with CERN EDMS (Engineering and Equipment Data Management System) system could facilitate product life cycle through the supply chain, and could affect on manufacturing operations performance in internaland external levels. The aim of the study was also to find out implementation differences within CERN (European Organization for Nuclear Research) projects. The study is divided into two parts: a qualitative theory section and an empirical section. In the theory section differences of features between PDM (Product Data Management), EDM (Engineering Data Management) and PLM (Product Life Cycle Management) systems were studied. The thesis examined the benefits and managerial challeng...

  12. "No queremos vender oxígeno" : the implementation of a REDD pilot project in the Bolivian Amazon

    OpenAIRE

    Bardalen, Ingunn

    2011-01-01

    Based on a six month fieldwork in an indigenous community in an indigenous territory, TCO, this thesis explore the initial stages of the implementation of a REDD pilot project in the northern Bolivian amazon. Since the establishment of the indigenous territory, there has been increasing pressure from logging companies and illegal logging, which has caused forest degradation in these areas. The REDD pilot project seek to reduce forest degradation in this area, and through monitoring this reduc...

  13. Problems of Research, Projects and Mechanisms for Their Implementation in Chelyabinsk City Agglomeration

    Science.gov (United States)

    Bolshakov, V. V.

    2017-11-01

    The article analyzes the research and design methods of urban agglomerations in the context of the Chelyabinsk agglomeration from the point of view of correctness, objectivity and consistency of the results obtained. The completed and approved project of the Chelyabinsk agglomeration is analysed to provide architectural and planning solutions for sustainable social and economic development according to the theories that have been formed to date. The possibility of effectuation and implementation of the approved project of the Chelyabinsk agglomeration taking in account existing specific natural, historical and socio-economic factors characteristic for the territory under consideration is examined. The authors draw the conclusions the project of the Chelyabinsk agglomeration has been developed in line with the town-planning solutions that do not reflect modern approaches based on the competitive advantages of territories and do not form a space providing transition to a modernized and innovative economy. Specific town-planning decisions have a weak justification and an undeveloped methodology for pre-project analysis and methodology for designing urban agglomerations because of absence of a full study of the phenomenon of urban agglomeration and processes occurring in it today. It is necessary to continue research in the field of development of the Chelyabinsk agglomeration with the use of a logical and objective methodology to analyze the territory and design which can lead to the formation of an urban-planning information model that reflects all the system processes and allows for predicting project solutions.

  14. The Project Towards No Drug Abuse (TND) dissemination trial: implementation fidelity and immediate outcomes.

    Science.gov (United States)

    Rohrbach, Louise Ann; Gunning, Melissa; Sun, Ping; Sussman, Steve

    2010-03-01

    One of the important research issues in the emerging area of research on dissemination of prevention programs relates to the type and extent of training needed by program providers to prepare them to implement effective programs with fidelity. The present paper describes the immediate outcomes of a dissemination and implementation trial of Project Toward No Drug Abuse, an evidence-based prevention program for high school students. A total of 65 high schools in 14 school districts across the USA were recruited and randomly assigned to one of three experimental conditions: comprehensive implementation support for teachers, regular workshop training only, or standard care control. The comprehensive intervention was comprised of on-site coaching, web-based support, and technical assistance, in addition to the regular workshop. Students (n = 2,983) completed self-report surveys before and immediately after program implementation. Fidelity of implementation was assessed with a classroom observation procedure that focused on program process. Results indicated that relative to the controls, both intervention conditions produced effects on hypothesized program mediators, including greater gains in program-related knowledge; greater reductions in cigarette, marijuana and hard drug use intentions; and more positive changes in drug-related beliefs. There were stronger effects on implementation fidelity in the comprehensive, relative to the regular, training condition. However, seven of the ten immediate student outcome measures showed no significant differences between the two training conditions. The implications of these findings for dissemination research and practice are discussed.

  15. Implementing Large Projects in Software Engineering Courses

    Science.gov (United States)

    Coppit, David

    2006-01-01

    In software engineering education, large projects are widely recognized as a useful way of exposing students to the real-world difficulties of team software development. But large projects are difficult to put into practice. First, educators rarely have additional time to manage software projects. Second, classrooms have inherent limitations that…

  16. Manpower development for nuclear power programme. China. Project findings and recommendations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1992-01-01

    The United Nations Development Program (UNDP) project was conceived in April 1985, implementation was started on preliminary authorization by summer 1986, and it was approved and signed in early 1987. The duration was originally planned for three years with a UNDP input of US$ 1,657.500 (including Government cost sharing of US$ 280,000). The project is now essentially completed with a few items still pending, though committed as firmly planned, and the current cost estimate is US$ 1,707.617. The objective of the project was to assist in establishing long-term training programmes in two training centres in the People's Republic of China (Qinshan and Suzhou) and strengthen the training capabilities at these centres. The two centres are intended to provide specialized comprehensive training in basic and applied nuclear power engineering disciplines as well as in construction, operation and maintenance of nuclear power plants to technical personnel assigned to the nuclear power plants in the People's Republic of China

  17. Implementing a Self- Checking PROFIBUS Slave

    OpenAIRE

    Krug, Margrit R.; Lubaszewski, Marcelo S.; Ferreira, Jose M.; Alves, Gustavo R.

    2000-01-01

    This work presents the study and preliminary results of the high level implementation of a self-checking Profibus slave. From an existing VHDL description of the device, a test strategy was studied and implemented, so that the whole circuit has embedded test structures capable to perform at-speed test of the slave. In this paper, we show the used test strategies and implementation results achieved from a synthesis process in a FPGA environment. info:eu-repo/semantics/publishedVersion

  18. Technological Implementation of Renewable Energy in Rural-Isolated Areas and Small-Medium Islands in Indonesia: Problem Mapping And Preliminary Surveys of Total People Participation in a Local Wind Pump Water Supply

    Science.gov (United States)

    Taufik, Ahmad

    2007-10-01

    This article discusses a formulation of problem mapping and preliminary surveys of total people participation in a local wind pump (LWP) water supply in term of technological implementation of renewable energy (RE) in rural-isolated areas and small-medium islands in Indonesia. The formulation was constructed in order to enhance and to promote the local product of RE across Indonesia. It was also addressed to accommodate local potencies, barriers and opportunities into a priority map. Moreover, it was designed into five aspects such as (1) local technology of the RE: a case of pilot project of the LWP; (2) environmental-cultural aspects related to global issues of energy-renewable energy; (3) potencies and barriers corresponding to local, national, regional and international contents; (4) education and training and (5) gender participation. To focus the formulation, serial preliminary surveys were conducted in five major areas, namely: (1) survey on support and barrier factors of the aspects; (2) strategic planning model, a concept A-B-G which stands for Academician-Business people-Government; (3) survey on background based knowledge on energy conservation; (4) survey on gender participation in energy conservation and (5) survey on local stakeholder involvement. Throughout the surveys, it has been notified that the concept needs to be developed to any level of its component since its elements were identified in tolerance values such as high potency value of the LWP development (95%); a strong potency of rural area application (88%); a medium background of energy, energy conservation (EC) identified in a range of 56%-72%, sufficient support from local stakeholders and gender participation.

  19. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  20. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  1. French 900 MWe PWR PSA preliminary results

    International Nuclear Information System (INIS)

    Lanore, J.M.; Brisbois, J.

    1988-10-01

    A PSA is performed by the Safety Assessment Department of CEA for a 900 MWe standardized plant. The paper presents the objectives, the scope of the study and the relative preliminary results. Some general insights are drawn, especially the benefit related to the implementation of emergency procedures

  2. Implementation of quality management in early stages of research and development projects at a university.

    Science.gov (United States)

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  3. From the Paper to the Tablet: On the Design of an AR-Based Tool for the Inspection of Pre-Fab Buildings. Preliminary Results of the SIRAE Project

    Science.gov (United States)

    Fernández, Marcos; Poza, Montse

    2018-01-01

    Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes. PMID:29671799

  4. From the Paper to the Tablet: On the Design of an AR-Based Tool for the Inspection of Pre-Fab Buildings. Preliminary Results of the SIRAE Project.

    Science.gov (United States)

    Portalés, Cristina; Casas, Sergio; Gimeno, Jesús; Fernández, Marcos; Poza, Montse

    2018-04-19

    Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes.

  5. The Cernavoda project - past and future

    International Nuclear Information System (INIS)

    Glodeanu, F.; Campureanu, T.; Chirica, T.; Popescu, D.

    1995-01-01

    The history of the Cernavoda nuclear power station in Romania is traced. It was conceived in 1977 as five unit CANDU-6 station and agreements were concluded on engineering, procurement and financial assistance with Atomic Energy of Canada Ltd (AECL) and Ansaldo of Italy. Delays in construction were created from the first, however, by efforts to manufacture as many components as possible in Romania, unfamiliarity with nuclear project management and the disadvantages of a highly centralised economy. Political changes since December 1989 have led to a new approach to project implementation. The Romanian Electricity Authority (RENEL), signed a new contract with AECL and Ansaldo in August 1991 to perform the project management for the completion of Cernavoda 1. The project has progressed very well and by the beginning of 1995 more than 90% of the plant systems were ready for commissioning and a full operating shift was in place. As a second phase of the nuclear power programme RENEL plans to complete Cernavoda 2, the construction of which was suspended at 30% completion. The three other units will be preserved in their present preliminary stage of construction up to 2000 while finance is sought for their completion. Nuclear power is seen as an environmentally clean means of meeting Romania's growing energy demand as the economy develops. (UK)

  6. Decommissioning Project Manager's Implementing Instructions (PMII)

    International Nuclear Information System (INIS)

    Mihalic, M.A.

    1998-02-01

    Decommissioning Project personnel are responsible for complying with these PMII. If at any time in the performance of their duties a conflict between these instructions and other written or verbal direction is recognized or perceived, the supervisor or worker shall place his/her work place in a safe condition, stop work, and seek resolution of the conflict from the Decommissioning Project Manager or his designee

  7. Implementing Livestock Anaerobic Digestion Projects

    Science.gov (United States)

    Page provides information to help make an informed decision about installing an anaerobic digester. Is it a good match for a farm’s organic waste, project financing, development guidelines and permit requirements?

  8. Preliminary Insights into the Implementation of Standardised IT in Franchise Systems

    Directory of Open Access Journals (Sweden)

    Angele Cavaye

    1999-05-01

    Full Text Available The franchise context provides a rich background for studying the implementation of standardised, interlinked IT systems. Benefits of IT implementation in franchises appear obvious, but the small business context and potential tension between the two main stakeholders (franchisor and franchisees tend to create difficulties in the implementation process. Case study methods were used to investigate IT implementation in franchise systems. Franchisee-related factors that clearly impact on implementation include perceived need for the IT system, cost of the system and the level of IT literacy among franchisees. Franchisor-related factors like coercion of franchisees and education of franchisees strongly facilitate implementation.

  9. Preliminary safety analysis report for the TFTR

    International Nuclear Information System (INIS)

    Lind, K.E.; Levine, J.D.; Howe, H.J.

    A Preliminary Safety Analysis Report has been prepared for the Tokamak Fusion Test Reactor. No accident scenarios have been identified which would result in exposures to on-site personnel or the general public in excess of the guidelines defined for the project by DOE

  10. The management, control and implementation of SCADA projects

    OpenAIRE

    2012-01-01

    M.Ing. The dissertation covers the establishment of a project from the point of view of a project manager. The document refers to examples where possible to illustrate the actual process through which a project goes during the life-cycle of the project. The first chapter provides an introduction to the context of the project and informs the reader of the type of project which the dissertation discusses. An overview of SCAD A (Supervisory Control and Data Acquisition) systems is discussed f...

  11. The NASA Bed Rest Project

    Science.gov (United States)

    Rhodes, Bradley; Meck, Janice

    2005-01-01

    NASA s National Vision for Space Exploration includes human travel beyond low earth orbit and the ultimate safe return of the crews. Crucial to fulfilling the vision is the successful and timely development of countermeasures for the adverse physiological effects on human systems caused by long term exposure to the microgravity environment. Limited access to in-flight resources for the foreseeable future increases NASA s reliance on ground-based analogs to simulate these effects of microgravity. The primary analog for human based research will be head-down bed rest. By this approach NASA will be able to evaluate countermeasures in large sample sizes, perform preliminary evaluations of proposed in-flight protocols and assess the utility of individual or combined strategies before flight resources are requested. In response to this critical need, NASA has created the Bed Rest Project at the Johnson Space Center. The Project establishes the infrastructure and processes to provide a long term capability for standardized domestic bed rest studies and countermeasure development. The Bed Rest Project design takes a comprehensive, interdisciplinary, integrated approach that reduces the resource overhead of one investigator for one campaign. In addition to integrating studies operationally relevant for exploration, the Project addresses other new Vision objectives, namely: 1) interagency cooperation with the NIH allows for Clinical Research Center (CRC) facility sharing to the benefit of both agencies, 2) collaboration with our International Partners expands countermeasure development opportunities for foreign and domestic investigators as well as promotes consistency in approach and results, 3) to the greatest degree possible, the Project also advances research by clinicians and academia alike to encourage return to earth benefits. This paper will describe the Project s top level goals, organization and relationship to other Exploration Vision Projects, implementation

  12. Determining the directions of increasing the innovative potential of the region by developing innovative technologies and competences when preparing and implementing large investment projects

    Directory of Open Access Journals (Sweden)

    Timur V. Kramin

    2015-12-01

    Full Text Available Objective to determine the directions of increasing the innovative potential of a region through the development of innovative technologies and competences in the process of preparation and implementation of large investment projects in the Republic of Tatarstan. Methods methodology of project management institutional approach. Results it is proved that the main largescale directions of innovative potential development in the Republic of Tatarstan as a result of preparation and implementing of Universiade 2013 in Kazan are knowledge management information technologies risk management. It is shown that in the framework of the considered innovative areas a complete system was formed of competences of employees and managers in the fields of education trade hospitality and service. Scientific novelty the key directions were defined of increasing the innovative potential of a region through the development of innovative technologies and competences in the process of preparation and implementation of large investment projects by the example of the World Summer Student Games in Kazan in 2013. Practical significance on the basis of specific examples the authors illustrate the practiceoriented mechanism of innovative potential development of a region as a result of implementation of large investment projects. nbsp

  13. A preliminary assessment of the Normative Framework regulating MAR schemes in Europe: the EU Directives and their Implementation in nine National Legislations

    Directory of Open Access Journals (Sweden)

    Matteo E. Bonfanti

    2014-09-01

    Full Text Available The use of MAR schemes within the European Union is not a new phenomenon, on the contrary it dates back to the beginning of the XIX century. Despite being widely adopted and currently the object of extensive studies, this tool is not soundly regulated and so far very little research has been conducted on the normative framework regulating MAR at the regional and at the national level. This paper draws upon the findings of a Report which represents one of the deliverables identified by MARSOL, a EU FP7 project launched in December 2013 that aims at demonstrating that MAR shall be regarded as a viable approach to address the predicted water shortages over the long term. Through a survey which involved a number of national experts, the researchers involved in the drafting of the Report have collected relevant data concerning the national legal frameworks of nine EU countries that adopt MAR schemes. The results of the questionnaire have been processed using a qualitative and comparative approach and have been duly included in the legal analysis, which covers the implementation at the national level of the two EU Directives relevant for MAR Schemes, i.e. the Water Framework Directive and its “daughter”, the Groundwater Directive. This paper shall be considered as the outcome of a preliminary investigation which covered only a limited number of European countries, it is expected that the research will be carried out as to include a larger number of EU Member States (MSs, alongside the most relevant extra EU countries.

  14. Management systems oriented to projects: need for its implementation in sports academic institutions

    Directory of Open Access Journals (Sweden)

    Maidelyn Díaz Pérez

    2017-12-01

    Full Text Available The literature refers to the need that all academic institutions have today to use information systems articulated with the different processes that the organization executes. The idea of using this type of system is to convert the available information into knowledge that represents a competitive advantage for the organization. However, despite being a strength for any organization both to manage their strategic information and to manage the information generated by research projects, they are still not widely used. The reality shows that the academic sports institutions of the country and mainly the faculties of physical culture lack a culture in the use of systems to manage different substantive tasks of the center, such as the activity of research projects. It is estimated that if they rely more on the optimal use of the information and knowledge they have at the group level, all their scientific production indicators will be significantly increased. From this scenario, this research aims to expose the main strengths of information and knowledge management systems, mainly those aimed at projects for the stimulation of their use and implementation in academic institutions associated with sports. To achieve this objective, the logical historical method, direct observation, the method of analysis and synthesis, etc. were used. And among the main results obtained in this research there  is the relevance of the use of information management systems and knowledge aimed at projects to contribute to the promotion and success of research activities generated by projects.

  15. Preliminary final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-01-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternative systems for conducting the ground water program. One of these systems is the proposed action. These alternatives do not address site-specific ground water compliance strategies, because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS presents multiple ground water compliance strategies, each with its own set of potential impacts, that could be used to implement all the alternatives presented in the PEIS except the no action alternative. The no action alternative must be considered by law. It consists of taking no action to meet EPA standards. Implementing all PEIS alternatives (except no action) means applying a ground water compliance strategy or a combination of strategies that would result in site-specific impacts

  16. Implementing parallel spreadsheet models for health policy decisions: The impact of unintentional errors on model projections.

    Science.gov (United States)

    Bailey, Stephanie L; Bono, Rose S; Nash, Denis; Kimmel, April D

    2018-01-01

    Spreadsheet software is increasingly used to implement systems science models informing health policy decisions, both in academia and in practice where technical capacity may be limited. However, spreadsheet models are prone to unintentional errors that may not always be identified using standard error-checking techniques. Our objective was to illustrate, through a methodologic case study analysis, the impact of unintentional errors on model projections by implementing parallel model versions. We leveraged a real-world need to revise an existing spreadsheet model designed to inform HIV policy. We developed three parallel versions of a previously validated spreadsheet-based model; versions differed by the spreadsheet cell-referencing approach (named single cells; column/row references; named matrices). For each version, we implemented three model revisions (re-entry into care; guideline-concordant treatment initiation; immediate treatment initiation). After standard error-checking, we identified unintentional errors by comparing model output across the three versions. Concordant model output across all versions was considered error-free. We calculated the impact of unintentional errors as the percentage difference in model projections between model versions with and without unintentional errors, using +/-5% difference to define a material error. We identified 58 original and 4,331 propagated unintentional errors across all model versions and revisions. Over 40% (24/58) of original unintentional errors occurred in the column/row reference model version; most (23/24) were due to incorrect cell references. Overall, >20% of model spreadsheet cells had material unintentional errors. When examining error impact along the HIV care continuum, the percentage difference between versions with and without unintentional errors ranged from +3% to +16% (named single cells), +26% to +76% (column/row reference), and 0% (named matrices). Standard error-checking techniques may not

  17. The IAHR project CCHE-Climate Change impact on the Hydrological cycle, water management and Engineering: an overview and preliminary results

    Science.gov (United States)

    Ranzi, Roberto; Kojiri, T.; Mynett, A.; Barontini, S.; van de Giesen, N.; Kolokytha, E.; Ngo, L. A.; Oreamuno, R.; Renard, B.; Sighomnou, D.; Vizina, A.

    2010-05-01

    IAHR, the International Association for Hydro-Environment Engineering and Research launched a research Project called Climate Change impact on the Hydrological cycle, water management and Engineering (IAHR CCHE Project). It was motivated by the fact that, although it is now well accepted that, in the light of the recent IPCC reports the vast majority of members of the scientific community are convinced that the climate is changing or at least will experience a significant fluctuation already during the current century, it is perceived that some hydrologists, water experts and hydraulic engineers are not yet ready to incorporate climate change scenarios in their designs for such projects as: - flood protection and river training, - dam rehabilitation, - water resources management under water scarcity and changes in the hydrological regimes. The objective of the project is to encourage a close co-operation between the scientific and engineering communities in taking appropriate and timely action in response to the impact of climate change on the hydrological regime and on water resource projects. The project aims at reporting on (a) the current state of knowledge as regards the impact of projected climate change on the hydrological regime in different regions of the world, where these regions are defined not just in geographic terms but also on the basis of their level of economic and water resources development; (b) the extent to which these impacts are recognized and taken into account by national water authorities, engineering organizations and other regulating bodies in setting their standard practices and procedures for the planning, design and operation of water works. These adaptation measures will include both "hard" responses, such as the construction or enlargement of engineering structures, and "soft" responses, such as changes in legislation or the operating rules of existing structures. An overview of the project and preliminary results extracted from of

  18. Socio-economic drivers in implementing bioenergy projects

    International Nuclear Information System (INIS)

    Domac, J.; Richards, K.; Risovic, S.

    2005-01-01

    Within the international community there is considerable interest in the socio-economic implications of moving society towards the more widespread use of renewable energy resources. Such change is seen to be very necessary but is often poorly communicated to people and communities who need to accept such changes. There are pockets of activity across the world looking at various approaches to understand this fundamental matter. Typically, socio-economic implications are measured in terms of economic indices, such as employment and monetary gains, but in effect the analysis relates to a number of aspects which include social, cultural, institutional, and environmental issues. The extremely complex nature of bioenergy, many different technologies involved and a number of different, associated aspects (socio-economics, greenhouse gas mitigation potential, environment, ?) make this whole topic a complex subject. This paper is primarily a descriptive research and review of literature on employment and other socio-economic aspects of bioenergy systems as drivers for implementing bioenergy projects. Due to the limited information, this paper does not provide absolute quantification on the multiplier effects of local and or national incomes of any particular country or region. The paper intends to trigger a more in-depth discussion of data gaps, potentials, opportunities and challenges. An encouraging trend is that in many countries policy makers are beginning to perceive the potential economic benefits of commercial biomass e.g. employment/earnings, regional economic gain, contribution to security of energy supply and all others

  19. Ubiquitous-severance hospital project: implementation and results.

    Science.gov (United States)

    Chang, Bung-Chul; Kim, Nam-Hyun; Kim, Young-A; Kim, Jee Hea; Jung, Hae Kyung; Kang, Eun Hae; Kang, Hee Suk; Lee, Hyung Il; Kim, Yong Ook; Yoo, Sun Kook; Sunwoo, Ilnam; An, Seo Yong; Jeong, Hye Jeong

    2010-03-01

    The purpose of this study was to review an implementation of u-Severance information system with focus on electronic hospital records (EHR) and to suggest future improvements. Clinical Data Repository (CDR) of u-Severance involved implementing electronic medical records (EMR) as the basis of EHR and the management of individual health records. EHR were implemented with service enhancements extending to the clinical decision support system (CDSS) and expanding the knowledge base for research with a repository for clinical data and medical care information. The EMR system of Yonsei University Health Systems (YUHS) consists of HP integrity superdome servers using MS SQL as a database management system and MS Windows as its operating system. YUHS is a high-performing medical institution with regards to efficient management and customer satisfaction; however, after 5 years of implementation of u-Severance system, several limitations with regards to expandability and security have been identified.

  20. Multi-stage IT project evaluation: The flexibility value obtained by implementing and resolving Berk, Green and Naik (2004) model

    Science.gov (United States)

    Abid, Fathi; Guermazi, Dorra

    2009-11-01

    In this paper, we evaluate a multi-stage information technology investment project, by implementing and resolving Berk, Green and Naik's (2004) model, which takes into account specific features of IT projects and considers the real option to suspend investment at each stage. We present a particular case of the model where the project value is the solution of an optimal control problem with a single state variable. In this case, the model is more intuitive and tractable. The case study confirms the practical potential of the model and highlights the importance of the real-option approach compared to classical discounted cash flow techniques in the valuation of IT projects.

  1. Toward Elimination of Dog-Mediated Human Rabies: Experiences from Implementing a Large-scale Demonstration Project in Southern Tanzania.

    Science.gov (United States)

    Mpolya, Emmanuel Abraham; Lembo, Tiziana; Lushasi, Kennedy; Mancy, Rebecca; Mbunda, Eberhard M; Makungu, Selemani; Maziku, Matthew; Sikana, Lwitiko; Jaswant, Gurdeep; Townsend, Sunny; Meslin, François-Xavier; Abela-Ridder, Bernadette; Ngeleja, Chanasa; Changalucha, Joel; Mtema, Zacharia; Sambo, Maganga; Mchau, Geofrey; Rysava, Kristyna; Nanai, Alphoncina; Kazwala, Rudovick; Cleaveland, Sarah; Hampson, Katie

    2017-01-01

    A Rabies Elimination Demonstration Project was implemented in Tanzania from 2010 through to 2015, bringing together government ministries from the health and veterinary sectors, the World Health Organization, and national and international research institutions. Detailed data on mass dog vaccination campaigns, bite exposures, use of post-exposure prophylaxis (PEP), and human rabies deaths were collected throughout the project duration and project areas. Despite no previous experience in dog vaccination within the project areas, district veterinary officers were able to implement district-wide vaccination campaigns that, for most part, progressively increased the numbers of dogs vaccinated with each phase of the project. Bite exposures declined, particularly in the southernmost districts with the smallest dog populations, and health workers successfully transitioned from primarily intramuscular administration of PEP to intradermal administration, resulting in major cost savings. However, even with improved PEP provision, vaccine shortages still occurred in some districts. In laboratory diagnosis, there were several logistical challenges in sample handling and submission but compared to the situation before the project started, there was a moderate increase in the number of laboratory samples submitted and tested for rabies in the project areas with a decrease in the proportion of rabies-positive samples over time. The project had a major impact on public health policy and practice with the formation of a One Health Coordination Unit at the Prime Minister's Office and development of the Tanzania National Rabies Control Strategy, which lays a roadmap for elimination of rabies in Tanzania by 2030 by following the Stepwise Approach towards Rabies Elimination (SARE). Overall, the project generated many important lessons relevant to rabies prevention and control in particular and disease surveillance in general. Lessons include the need for (1) a specific unit in the

  2. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2001-01-01

    The meeting of the ITER CTA Project Board took place in Toronto, Canada on 7 November 2001, on the occasion of the first Negotiations Meeting. Twelve participants, representing PB members and experts from Canada, the EU, Japan, the RF and the international Team (IT), attended the meeting chaired by Acad. E. Velikhov. Discussions on the preliminary work programme for the CTA and organizational arrangements for the IT and PT took most of the time of the meeting. The Project Board approved the preliminary work programme as presented by the IT leader

  3. Designing Summer Research Experiences for Teachers and Students That Promote Classroom Science Inquiry Projects and Produce Research Results

    Science.gov (United States)

    George, L. A.; Parra, J.; Rao, M.; Offerman, L.

    2007-12-01

    Research experiences for science teachers are an important mechanism for increasing classroom teachers' science content knowledge and facility with "real world" research processes. We have developed and implemented a summer scientific research and education workshop model for high school teachers and students which promotes classroom science inquiry projects and produces important research results supporting our overarching scientific agenda. The summer training includes development of a scientific research framework, design and implementation of preliminary studies, extensive field research and training in and access to instruments, measurement techniques and statistical tools. The development and writing of scientific papers is used to reinforce the scientific research process. Using these skills, participants collaborate with scientists to produce research quality data and analysis. Following the summer experience, teachers report increased incorporation of research inquiry in their classrooms and student participation in science fair projects. This workshop format was developed for an NSF Biocomplexity Research program focused on the interaction of urban climates, air quality and human response and can be easily adapted for other scientific research projects.

  4. Preliminary Insights into the Implementation of Standardised IT in Franchise Systems

    OpenAIRE

    Angele Cavaye; Colin McCosker; Chad Perry

    1999-01-01

    The franchise context provides a rich background for studying the implementation of standardised, interlinked IT systems. Benefits of IT implementation in franchises appear obvious, but the small business context and potential tension between the two main stakeholders (franchisor and franchisees) tend to create difficulties in the implementation process. Case study methods were used to investigate IT implementation in franchise systems. Franchisee-related factors that clearly impact on implem...

  5. Minnesota agripower project. Quarterly report, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Baloun, J.

    1997-07-01

    The Minnesota Valley Alfalfa Producers (MnVAP) propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota Industrial Park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project will utilize air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. The plant will demonstrate high efficiency and environmentally compatible electric power production, as well as increased economic yield from farm operations in the region. The initial phase of the Minnesota Agripower Project (MAP) will be to perform alfalfa feedstock testing, prepare preliminary designs, and develop detailed plans with estimated costs for project implementation. The second phase of MAP will include detailed engineering, construction, and startup. Full commercial operation will start in 2001.

  6. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  7. Overview of the OGAP Formative Assessment Project and CPRE's Large-Scale Experimental Study of Implementation and Impacts

    Science.gov (United States)

    Supovitz, Jonathan

    2016-01-01

    In this presentation discussed in this brief abstracted report, the author presents about an ongoing partnership with the Philadelphia School District (PSD) to implement and research the Ongoing Assessment Project (OGAP). OGAP is a systematic, intentional and iterative formative assessment system grounded in the research on how students learn…

  8. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  9. Design and implementation of real-time wireless projection system based on ARM embedded system

    Science.gov (United States)

    Long, Zhaohua; Tang, Hao; Huang, Junhua

    2018-04-01

    Aiming at the shortage of existing real-time screen sharing system, a real-time wireless projection system is proposed in this paper. Based on the proposed system, a weight-based frame deletion strategy combined sampling time period and data variation is proposed. By implementing the system on the hardware platform, the results show that the system can achieve good results. The weight-based strategy can improve the service quality, reduce the delay and optimize the real-time customer service system [1].

  10. Economics of forest and forest carbon projects. Translating lessons learned into national REDD+ implementation

    Energy Technology Data Exchange (ETDEWEB)

    Zaballa Romero, M.; Traerup, S.; Wieben, E.; Ravnkilde Moeller, L.; Koch, A.

    2013-01-15

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. The report is part of efforts to share financial experiences and lessons learned with policymakers, project developers and stakeholders, with the objective to inform forest project and strategy development. It presents experiences and advice on the risks, costs and revenues of forest projects, thereby informing not only the development of future REDD+ initiatives but also the testing of advanced market commitments as a finance option for sustainable forest management. The findings in the report underline the fact that only through sound and transparent financial information will forest projects and national forest initiatives become interesting for private financial institutions and comparable with other investment opportunities. It is therefore important to include robust analysis of the operations business case and its financial attractiveness to commercial investors, early in the design process. As for the economics of forest and forest carbon projects, it appears that REDD+ payments alone, especially at current prices, will not deliver the revenues that cover all expenses of transparent and long-term mitigation of forest carbon emissions. Instead the findings underline the importance of building up forest operations which effectively manages risk and delivers several revenue streams. These findings are aligned with the advocacy efforts of UNEP and the UN-REDD Programme on multiple benefits and the combination of various funding and

  11. Technology Development: From Idea to Implementation - 12131

    Energy Technology Data Exchange (ETDEWEB)

    Spires, Renee H. [Savannah River Remediation (United States)

    2012-07-01

    There are good ideas and new technologies proposed every day to solve problems within the DOE complex. A process to transition a new technology from inception to the decision to launch a project with baselines is described. Examples from active technology development projects within Savannah River Remediation (SRR) will be used to illustrate the points. The process includes decision points at key junctures leading to preliminary design. At that point, normal project management tools can be employed. The technology development steps include proof-of-principle testing, scaled testing and analysis, and conceptual design. Tools are used that define the scope necessary for each step of technology development. The tools include use of the DOE technology readiness guide, Consolidated Hazards Analysis (CHA) and internal checklists developed by Savannah River Remediation. Integration with operating or planned facilities is also included. The result is a roadmap and spreadsheet that identifies each open question and how it may be answered. Performance criteria are developed that enable simple decisions to be made after the completion of each step. Conceptual design tasks should begin as the technology development continues. The most important conceptual design tasks at this point in the process include process flow diagrams (PFDs), high level Process and Instrumentation Drawings (P and IDs), and general layout drawings. These should influence the design of the scaled simulant testing. Mechanical and electrical drawings that support cost and schedule development should also be developed. An early safety control strategy developed from the CHA will also influence the cost. The combination of test results, calculations and early design output with rough order of magnitude cost and schedule information provide input into the decisions to proceed with a project and data to establish the baseline. This process can be used to mature any new technology, especially those that must be

  12. [Implementation of the eLearning project NESTOR. A network for students in traumatology and orthopedics].

    Science.gov (United States)

    Back, D A; Haberstroh, N; Hoff, E; Plener, J; Haas, N P; Perka, C; Schmidmaier, G

    2012-01-01

    Modern internet-based information technologies offer great possibilities to create and improve teaching methods for students. The eLearning tool NESTOR (Network for Students in Traumatology and Orthopedics) presented here was designed to complement the existing clinical teaching in orthopedics and traumatology at the Charité, University Medicine Berlin. Using a learning management system, videos, podcasts, X-ray diagnosis, virtual patients, tests and further tools for learning and study information were combined. After implementation the eLearning project was evaluated by students. The NESTOR project offers various possibilities for knowledge acquisition. Students using the program voluntarily showed a high acceptance whereby 82.4% were very satisfied with the contents offered and 95.3% supported the idea of a future use of NESTOR in teaching. The blended learning approach was positively evaluated by 93.5% of the students. The project received the eLearning seal of quality of the Charité University Medicine Berlin. Using complex eLearning tools, such as the NESTOR project represents a contemporary teaching approach in the teaching of traumatology and orthopedics and should be offered in a blended learning context as they are well accepted by students.

  13. Financial and tax risks at implementation of ''Chayanda- Lensk'' section of ''Sila Sibiri'' gas transportation system construction project

    International Nuclear Information System (INIS)

    Sharf, I V; Chukhareva, N V; Kuznetsova, L P

    2014-01-01

    High social and economic importance of large-scale projects on gasification of East Siberian regions of Russia and diversifying gas exports poses the problem of complex risk analysis of the project. This article discusses the various types of risks that could significantly affect the timing of the implementation and effectiveness of the project for the construction of the first line of ''Sila Sibiri'', the ''Chayanda-Lensk'' section. Special attention is paid to financial and tax aspects of the project. Graphically presented analysis of the dynamics of financial indicators reflect certain periods of effectiveness in implementing the project. Authors also discuss the possible causes and consequences of risks

  14. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    International Nuclear Information System (INIS)

    Herborn, D.I.

    1993-11-01

    Westinghouse Hanford Company (WHC) is the Integrating Contractor for the Hanford Waste Vitrification Plant (HWVP) Project, and as such is responsible for preparation of the HWVP Preliminary Safety Analysis Report (PSAR). The HWVP PSAR was prepared pursuant to the requirements for safety analyses contained in US Department of Energy (DOE) Orders 4700.1, Project Management System (DOE 1987); 5480.5, Safety of Nuclear Facilities (DOE 1986a); 5481.lB, Safety Analysis and Review System (DOE 1986b) which was superseded by DOE order 5480-23, Nuclear Safety Analysis Reports, for nuclear facilities effective April 30, 1992 (DOE 1992); and 6430.lA, General Design Criteria (DOE 1989). The WHC procedures that, in large part, implement these DOE requirements are contained in WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual. This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals

  15. Financial sustainability of PV implementation in Swaziland

    International Nuclear Information System (INIS)

    Westra, C.A.; Van Roekel, G.M.; Lasschuit, P.E.

    2001-10-01

    During the past 10 years, more than 700 Solar Home Systems have been implemented by this project in Swaziland, southern Africa. The implementation process started with household energy surveys, the results of which showing significant energy needs for cooking, lighting and basic communication applications (i.e. radio/TV), particularly in rural areas. An implementation project of Solar Home Systems was set up to start rural electrification with solar PV and focused on lighting and small electrical demands. The national government, whose own resources were limited, supported the project as an important step towards addressing the country's range of energy needs. Together with a local company, Swazitronix, a joint venture was established to facilitate the implementation project. With a project loan from the Dutch social bank, the Triodosbank, standard Solar Home Systems were sold, assembled, installed and serviced. Customers paid the full cost of their PV systems and services. Awareness and education issues also formed key aspects of the project. During a later project phase, credit financing instruments were introduced providing a final element of experience crucial to future project implementation. The project's relative success and experiences (i.e. 82% loan repayment rate, detailed review of the causes behind loan defaults, and monitoring survey results) are detailed herein, providing valuable lessons regarding financial sustainability, the linchpin of successful PV implementation. 8 refs

  16. The life cycle management of the analogical I and C in NPP modernization project

    International Nuclear Information System (INIS)

    Wang Hongtao

    2014-01-01

    The existing NPPS (nuclear power plants) are subject for the ageing and obsolete problems of the analogue I and C systems. The large scope I and C upgrade project based on the DCS technology has the following challenged characteristics: the complicated technology, the broad impacts, the big investment and the long implementation period. This document gives a preliminary introduction and analysis from the aspects including the motives for the upgrade, I and C design base, the digital technology characteristics, I and C function analysis, I and C safety classification, I and C architecture, life-cycle-management mission for the related stages. Considering the experiences and lessons learned from the similar I and C upgrade projects in foreign NPPS, the conclusion and recommendation is given for I and C modernization based on the digital technology. (author)

  17. Involving construction in the preliminary engineering process

    International Nuclear Information System (INIS)

    Mahoney, D.T. Jr.; Boccieri, S.V. Jr.

    1994-01-01

    With today's high cost associated with modifications in nuclear power plants, it is imperative that the authors continue to investigate ways to cut costs but at the same time improve efficiency and reduce radiation exposure to those directly associated with the implementation of modifications. The success associated with involving construction in the preliminary engineering process will not only cut costs and improve efficiency but will establish a Team Building concept to provide accountability to all those associated with the implementation of the task. This form of partnering focuses on the solutions rather than highlighting the difficulties. This paper will demonstrate techniques to implement such ideas and provide examples to corroborate actual successes already achieved

  18. 76 FR 6459 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13954-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...

  19. 76 FR 7838 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13953-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...

  20. Implementing change: lessons from five development projects

    DEFF Research Database (Denmark)

    Riis, J. O.; Hildebrandt, S.; Andreasen, Mogens Myrup

    2001-01-01

    The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... with organizational changes. Thirdly, four paradoxes for managing development projects are presented; they may serve as guidelines for coping with the complexity and uncertainty of change processes......The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... in the change process, the role of a vision of the future company; and organizational learning processes taking place during the development project. Secondly, different interpretation models will be employed in an effort to broaden the understanding of the many facets and viewpoints associated...

  1. Preliminary Development of a Work Breakdown Structure (WBS) for Small Modular Reactors (SMRs)

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, Thomas J [ORNL; Moses, Rebecca J [ORNL; Flanagan, George F [ORNL

    2014-10-01

    In summary, this preliminary WBS serves as an initial basis for the capital cost component of the economic analysis of SMRs. This preliminary WBS comes from the known WBS for existing, large nuclear power plants and develops the methodology for accounting for the anticipated differences between the current large plants and the projected SMR designs.

  2. Natural Water Retention Measures (NWRM): from Design to Implementation through European Projects

    International Nuclear Information System (INIS)

    Magdaleno Mas, F.; Dalacamara Andres, G.

    2015-01-01

    The Centre for Applied Technique Studies (CETA) of CEDEX has been working over the last few years in different European projects related with the design and development of natural water retention measures (NWRM). These are a number of measures, boosted by the Water Unit of the Environment Directorate-General of the European Commission. with close links to green infrastructures, which try to integrate, from a multifunctional approach, different legal and technical requirements aimed at a better adaptation to extreme hydro meteorological events, environmental protection and conservation, and maintenance of ecosystem services. This paper reviews the underpinning foundations of the concept and the mechanisms for designing and implementing NWRM. It also shows the way they can be applied, by presenting different initiatives developed by CETA since 2008 in Navarra (Arga-Aragon rivers system). For fulfilling those works, CETA has collaborated with environmental and hydraulic authorities of Navarra. It has also actively cooperated with research centres, such as the Institute IMDEA Water. specifically in a European project devoted to the diffusion, assessment, and presentation of NWRM within the context of the EU River Basin Districts. (Author)

  3. Medical Audit: A Nigerian Teaching Hospital's Preliminary Experience

    African Journals Online (AJOL)

    The definition, historical background, aims dimensions and the characteristics of medical audit as well as the indices to be measured in a medical audit exercise are highlighted. The preliminary experience of the University of Ilorin Teaching Hospital (UITH) in the planning, implementation and monitoring of a viable medical ...

  4. Preliminary Planck constant measurements via UME oscillating magnet Kibble balance

    Science.gov (United States)

    Ahmedov, H.; Babayiğit Aşkın, N.; Korutlu, B.; Orhan, R.

    2018-06-01

    The UME Kibble balance project was initiated in the second half of 2014. During this period we have studied the theoretical aspects of Kibble balances, in which an oscillating magnet generates AC Faraday’s voltage in a stationary coil, and constructed a trial version to implement this idea. The remarkable feature of this approach is that it can establish the link between the Planck constant and a macroscopic mass by one single experiment in the most natural way. Weak dependences on variations of environmental and experimental conditions, small size, and other useful features offered by this novel approach reduce the complexity of the experimental set-up. This paper describes the principles of the oscillating magnet Kibble balance and gives details of the preliminary Planck constant measurements. The value of the Planck constant determined with our apparatus is \\boldsymbol{h}/{{\\boldsymbol{h}}\\boldsymbol 90}={1}{.000} {004}~ , with a relative standard uncertainty of 6 ppm.

  5. Basic survey for Joint Implementation on Jinling Petrochemical Corporation, China. Energy conservation project for Nanjing Refinery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, the basic survey was conducted on potential energy conservation at Nanjing Refinery, Jiangsu Nanjing city, China. Investigational studies were made on the repair of the power recovery system in line with the plan to enlarge the fluid catalytic cracker (FCC) and the power recovery using exhaust gas from the RFCC catalytic regeneration system. Moreover, the energy conservation technology to reduce power loads of the refining system was adopted to this project. As a result, it was found out that this repair plan makes recovery of the power equivalent to 10.6MW possible and produces the effect of reducing the fuel to be used. The realization of this project brings the CO2 reduction amount of approximately 70,000 t/y. It was also found out that this project not only reduces a large amount of greenhouse effect gas emissions, but contributes to profits of the plant concerned and helps improve the environment in the area concerned. For the implementation of this project, the detailed plan is expected to be further discussed. (NEDO)

  6. Enhancing system-wide implementation of opioid prescribing guidelines in primary care: protocol for a stepped-wedge quality improvement project.

    Science.gov (United States)

    Zgierska, Aleksandra E; Vidaver, Regina M; Smith, Paul; Ales, Mary W; Nisbet, Kate; Boss, Deanne; Tuan, Wen-Jan; Hahn, David L

    2018-06-05

    Systematic implementation of guidelines for opioid therapy management in chronic non-cancer pain can reduce opioid-related harms. However, implementation of guideline-recommended practices in routine care is subpar. The goal of this quality improvement (QI) project is to assess whether a clinic-tailored QI intervention improves the implementation of a health system-wide, guideline-driven policy on opioid prescribing in primary care. This manuscript describes the protocol for this QI project. A health system with 28 primary care clinics caring for approximately 294,000 primary care patients developed and implemented a guideline-driven policy on long-term opioid therapy in adults with opioid-treated chronic non-cancer pain (estimated N = 3980). The policy provided multiple recommendations, including the universal use of treatment agreements, urine drug testing, depression and opioid misuse risk screening, and standardized documentation of the chronic pain diagnosis and treatment plan. The project team drew upon existing guidelines, feedback from end-users, experts and health system leadership to develop a robust QI intervention, targeting clinic-level implementation of policy-directed practices. The resulting multi-pronged QI intervention included clinic-wide and individual clinician-level educational interventions. The QI intervention will augment the health system's "routine rollout" method, consisting of a single educational presentation to clinicians in group settings and a separate presentation for staff. A stepped-wedge design will enable 9 primary care clinics to receive the intervention and assessment of within-clinic and between-clinic changes in adherence to the policy items measured by clinic-level electronic health record-based measures and process measures of the experience with the intervention. Developing methods for a health system-tailored QI intervention required a multi-step process to incorporate end-user feedback and account for the needs of

  7. GPU implementation of Bayesian neural network construction for data-intensive applications

    International Nuclear Information System (INIS)

    Perry, Michelle; Meyer-Baese, Anke; Prosper, Harrison B

    2014-01-01

    We describe a graphical processing unit (GPU) implementation of the Hybrid Markov Chain Monte Carlo (HMC) method for training Bayesian Neural Networks (BNN). Our implementation uses NVIDIA's parallel computing architecture, CUDA. We briefly review BNNs and the HMC method and we describe our implementations and give preliminary results.

  8. Promoting Mentalizing in Pupils by Acting on Teachers: Preliminary Italian Evidence of the "Thought in Mind" Project.

    Science.gov (United States)

    Valle, Annalisa; Massaro, Davide; Castelli, Ilaria; Sangiuliano Intra, Francesca; Lombardi, Elisabetta; Bracaglia, Edoardo; Marchetti, Antonella

    2016-01-01

    Mentalization research focuses on different aspects of this topic, highlighting individual differences in mentalizing and proposing programs of intervention for children and adults to increase this ability. The "Thought in Mind Project" (TiM Project) provides training targeted to adults-teachers or parents-to increase their mentalization and, consequently, to obtain mentalization improvement in children. The present research aimed to explore for the first time ever the potential of training for teachers based on the TiM Project, regarding the enhancement of mentalizing of an adult who would have interacted as a teacher with children. For this reason, two teachers - similar for meta-cognitive and meta-emotional skills - and their classes (N = 46) were randomly assigned to the training or control condition. In the first case, the teacher participated in training on the implementation of promotion of mentalizing in everyday school teaching strategies; in the second case the teacher participated in a control activity, similar to training for scheduling and methods, but without promoting the implementation of mentalization (in both conditions two meetings lasting about 3 h at the beginning of the school year and two supervisions during the school year were conducted). The children were tested by tasks assessing several aspects of mentalization (second and third-order false belief understanding, Strange Stories, Reading the mind in the Eyes, Mentalizing Task) both before and after the teacher participate in the TiM or control training (i.e., at the beginning and at the end of the school year). The results showed that, although some measured components of mentalization progressed over time, only the TiM Project training group significantly improved in third order false belief understanding and changed - in a greater way compared to the control group - in two of the three components of the Mentalizing Task. These evidences are promising about the idea that the creation of

  9. The Mixed Waste Management Facility. Preliminary design review

    International Nuclear Information System (INIS)

    1995-01-01

    This document presents information about the Mixed Waste Management Facility. Topics discussed include: cost and schedule baseline for the completion of the project; evaluation of alternative options; transportation of radioactive wastes to the facility; capital risk associated with incineration; radioactive waste processing; scaling of the pilot-scale system; waste streams to be processed; molten salt oxidation; feed preparation; initial operation to demonstrate selected technologies; floorplans; baseline revisions; preliminary design baseline; cost reduction; and project mission and milestones

  10. Implementation of an Industrial-Based Case Study as the Basis for a Design Project in an Introduction to Mechanical Design Course

    Science.gov (United States)

    Lackey, Ellen

    2011-01-01

    The purpose of this paper is to discuss the implementation of an industrial-based case study as the basis for a design project for the Spring 2009 Introduction to Mechanical Design Course at the University of Mississippi. Course surveys documented the lack of student exposure in classes to the types of projects typically experienced by engineers…

  11. 23 CFR 924.11 - Implementation.

    Science.gov (United States)

    2010-04-01

    ... rural roads and the planning, preliminary engineering, and roadway safety audits related to specific..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services... vehicles or transit vehicles at signalized intersections may be funded at up to 100 percent Federal share...

  12. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  13. Implementation of an integrated on-line process surveillance and diagnostic system at the Halden reactor project: MOAS

    International Nuclear Information System (INIS)

    Kim, I.S.; Grini, R.-E.; Nilsen, S.

    2001-01-01

    MOAS is an integrated on-line process surveillance and diagnostic system that uses several different models for knowledge acquisition and diagnostic reasoning, such as goal-tree success-tree model, process monitor trees, and sensor failure diagnosis trees. Within these models, the knowledge of the process and its operation, including deep knowledge, like mass balance or controller algorithm, is incorporated. During an extensive review, made as part of the integrated diagnosis system project of the Halden reactor project, MOAS (Maryland Operator Advisory System) was identified as one of the most thorough systems developed thus far. MOAS encompasses diverse functional aspects that are required for an effective process disturbance management: (1) intelligent process monitoring and alarming, (2) on-line sensor data validation and sensor failure diagnosis, (3) on-line hardware (besides sensors) failure diagnosis, and (4) real-time corrective measure synthesis. The MOAS methodology was used for the NORS (Nokia Research Simulator) process at the Halden man-machine laboratory HAMMLAB of the OECD Halden reactor project. The performance tests of MOAS, implemented in G2 real-time expert system shell, show that MOAS successfully carries out its intended functions, i.e. quickly recognizing an occurring disturbance, correctly diagnosing its cause, and presenting advice on its control to the operator. The lessons learned and insights gained during the implementation and performance tests also are discussed

  14. Joint implementation initiatives in South Africa: A case study of two energy-efficiency projects

    Energy Technology Data Exchange (ETDEWEB)

    Van Horen, C.; Simmonds, G.; Parker, G.

    1998-11-01

    This paper explores the issues pertinent to Joint Implementation (JI) in South Africa by examining two prototype potential projects on energy efficiency with the potential for reducing greenhouse gas (GHG) emissions. The first is an energy-efficient lighting project based on the public electricity utility, Eskom's plan for a compact fluorescent lighting program in the residential sector. The analysis indicates that the CFL program could avoid emissions of up to 243 thousand tons of carbon over the first five years, at negative cost (that is, with a positive economic return). The second project involves the delivery of passive solar, energy-efficient housing to a low-income township in the Western Cape Province, at an incremental capital cost of approximately $2.5m for the 6000 houses. In this case, the avoided GHG emissions over the first five years amount to between 14 and 20 tons of carbon, and over the 50 year life-span of the project it will result to 140 to 200 thousand tons of avoided emissions at a cost of $13 to $17 per ton. The housing project has significant non-GHG benefits such as savings on energy bills and health, which accrue to the low-income dwellers. A number of important JI-specific issues and concerns emerge with respect to the two projects, which can also be applied to other potential JI opportunities in the country generally. These include the issues of carbon credit sharing, for which a number of scenarios are suggested, as well as estimating unknown macroeconomic impacts, such as the effects of CFLs on the country's incandescent lighting industry. Findings from an examination of both potential projects conclude that capacity-building within the country is critical to ensure that the technology being transferred balances efficiency, cost and quality appropriate to the South African context. Finally, assessment and evaluation, monitoring and verification criteria and institutions are called for to guarantee measurable long

  15. 75 FR 59706 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-09-28

    ... Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... on July 16, 2010, Coastal Hydropower, LLC filed an application for a preliminary permit, pursuant to... generation of the project would be 7.9 gigawatt-hours. Applicant Contact: Neil Anderson, Coastal Hydropower...

  16. Preliminary evaluation of the seismic hazard at Cernavoda NPP site

    International Nuclear Information System (INIS)

    Mingiuc, C.; Serban, V.; Androne, M.

    2001-01-01

    The probabilistic seismic hazard analysis (PSHA) is a methodology by which one evaluates the probability of exceeding different parameters of the ground motions (the maximum ground acceleration - PGA and the ground response spectrum - SA) as effect of the seismic action, on a given site at a future time moment. Due to the large uncertainties in the geological, geophysical, seismological input data, as well as, in the models utilised, various interpretation schemes are applied in the PSHA analyses. This interpretation schemes lead to opinion discrepancies among specialists which finally lead to disagreements in estimating the values of the seismic design for a given site. In order to re-evaluate the methodology and to improve the PSHA result stability, U.S. Nuclear Regulatory Commission (NRC), U.S. Department of Energy (DOE) and Electric Power Research Institute (EPRI) sponsored a project for defining methodological guides of performing PSHA analyses. The project was implemented by a panel of 7 experts, the Senior Seismic Hazard Analysis Committee - SSHAC. This paper presents a preliminary evaluation of the seismic hazard for the Cernavoda NPP site by application of the methodology mentioned, by taking into account the possible sources which could affect the site (the Vrancea focus, Galati - Tulcea fault, Sabla - Dulovo fault and local earthquakes)

  17. The implementation of sustainability principles in project management

    NARCIS (Netherlands)

    Gilbert Gilbert Silvius; Debby Goedknegt

    2012-01-01

    It is becoming clear that the project management practice must embrace sustainability in order to develop into a 'true profession' (Silvius et al., 2012). In project management, sustainability can be gained in both the product of the project and in the process of delivering the product. (Gareis et

  18. Once the shovel hits the ground : Evaluating the management of complex implementation processes of public-private partnership infrastructure projects with qualitative comparative analysis

    NARCIS (Netherlands)

    S. Verweij (Stefan)

    2015-01-01

    markdownabstractAbstract Much attention is being paid to the planning of public-private partnership (PPP) infrastructure projects. The subsequent implementation phase – when the contract has been signed and the project ‘starts rolling’ – has received less attention. However, sound agreements

  19. Space Elevators Preliminary Architectural View

    Science.gov (United States)

    Pullum, L.; Swan, P. A.

    Space Systems Architecture has been expanded into a process by the US Department of Defense for their large scale systems of systems development programs. This paper uses the steps in the process to establishes a framework for Space Elevator systems to be developed and provides a methodology to manage complexity. This new approach to developing a family of systems is based upon three architectural views: Operational View OV), Systems View (SV), and Technical Standards View (TV). The top level view of the process establishes the stages for the development of the first Space Elevator and is called Architectural View - 1, Overview and Summary. This paper will show the guidelines and steps of the process while focusing upon components of the Space Elevator Preliminary Architecture View. This Preliminary Architecture View is presented as a draft starting point for the Space Elevator Project.

  20. Preliminary design report for the prototypical fuel rod consolidation system

    International Nuclear Information System (INIS)

    Rosa, J.M.

    1986-01-01

    This report documents NUTECH's preliminary design of a dry, spent fuel rod consolidation system. This preliminary design is the result of Phase I of a planned four phase project. The present report on this project provides a considerable amount of detail for a preliminary design effort. The design and all of its details are described in this Preliminary Design Report (PDR). The NUTECH dry rod consolidation system described herein is remotely operated. It provides for automatic operation, but with operator hold points between key steps in the process. The operator has the ability to switch to a manual operation mode at any point in the process. The system is directed by the operator using an executive computer which controls and coordinates the operation of the in-cell equipment. The operator monitors the process using an in-cell closed circuit television (CCTV) system with audio output and equipment status displays on the computer monitor. The in-cell mechanical equipment consists of the following: (1) two overhead cranes with manipulators; (2) a multi-degree of freedom fuel handling table and its clamping equipment; (3) a fuel assembly end fitting removal station and its tools; (4) a consolidator (which pulls rods, assembles the consolidated bundle and loads the canister); (5) a canister end cap welder and weld inspection system; (6) decontamination systems; and (7) the CCTV and microphone systems