WorldWideScience

Sample records for preliminary planning study

  1. Preliminary design county plan Zeeland

    International Nuclear Information System (INIS)

    1987-01-01

    The preliminary design 'Streekplan Zeeland' (Country plan Zeeland, with regard to the location of additional nuclear power plants in Zeeland, the Netherlands) has passed through a consultation and participation round. Thereupon 132 reactions have been received. These have been incorporated and answered in two notes. This proposal deals with the principal points of the preliminary design and treats also the remarks of the committees Environmental (town and country) Planning (RO), Provincial (town and country) Planning Committee (PPC) and Association of Communities of Zeeland (VZG), on the reply notes. The preliminary design with the modifications, collected in appendix 3, is proposed to be the starting point in the drawing-up of the design-country-plan. This design subsequently will pass the formal country-plan procedure. (author). 1 fig

  2. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  3. Preliminary Validation and Verification Plan for CAREM Reactor Protection System

    International Nuclear Information System (INIS)

    Fittipaldi, Ana; Maciel Felix

    2000-01-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan

  4. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  5. Preliminary rock mechanics laboratory: Investigation plan

    International Nuclear Information System (INIS)

    Oschman, K.P.; Hummeldorf, R.G.; Hume, H.R.; Karakouzian, M.; Vakili, J.E.

    1987-01-01

    This document presents the rationale for rock mechanics laboratory testing (including the supporting analysis and numerical modeling) planned for the site characterization of a nuclear waste repository in salt. This plan first identifies what information is required for regulatory and design purposes, and then presents the rationale for the testing that satisfies the required information needs. A preliminary estimate of the minimum sampling requirements for rock laboratory testing during site characterization is also presented. Periodic revision of this document is planned

  6. Preliminary plan for treating mixed waste

    International Nuclear Information System (INIS)

    Vandegrift, G.F.; Conner, C.; Hutter, J.C.; Leonard, R.A.; Nunez, L.; Sedlet, J.; Wygmans, D.G.

    1993-06-01

    A preliminary waste treatment plan was developed for disposing of radioactive inorganic liquid wastes that contain hazardous metals and/or hazardous acid concentrations at Argonne National Laboratory. This plan, which involves neutralization and sulfide precipitation followed by filtration, reduces the concentration of hazardous metals and the acidity so that the filtrate liquid is simply a low-level radioactive waste that can be fed to a low-level waste evaporator

  7. A study on the development plan and preliminary design of proton accelerator for nuclear application

    Energy Technology Data Exchange (ETDEWEB)

    Eom, Tae Yoon; Choi, B H; Park, C K; Chung, K S. and others

    1997-11-01

    A study on the development plan and preliminary design for the realisation of high current proton accelerator to be used as an essential component for the R and D of accelerator-driven system (ADS) for energy production and transmutation of long-lived radionuclides. Various fields of application of the accelerator such as basic nuclear physics, material science, biology, high energy physics, medicine, etc. were also investigated. From the preliminary design study, 1 GeV (20 mA) - Linac is required for the purposed of transmutation and energy production. Specification of injector, RFQ, CCTL and SL was also suggested. For the case study, a duoplasmatron ion source was designed by KAERI and fabricated by a domestic manufacturer, and the performance was also tested. (author). 71 refs., 61 tabs., 131 figs

  8. GRIST-2 preliminary test plan and requirements for fuel fabrication and preirradiation

    International Nuclear Information System (INIS)

    Tang, I.M.; Harmon, D.P.; Torri, A.

    1978-12-01

    The preliminary version of the GRIST-2 test plan has been developed for the planned initial 5 years (1984 to 1989) of TREAT-Upgrade in-pile tests. These tests will be employed to study the phenomenology and integral behavior of GCFR core disruptive accidents (CDAs) and to support the Final Safety Analysis Report (FSAR) CDA analyses for the demonstration plant licensing. The preliminary test plan is outlined. Test Phases I and II are for the fresh fuel (preconditioned or not) CDA behavior at the beginning-of-life (BOL) reactor state. Phase III is for the reactor state that contains irradiated fuel with a saturated content of helium and fission gas. Phase IV is for larger bundle tests and scaling effects

  9. 76 FR 78183 - Preliminary Plan for Retrospective Review Under E.O. 13579

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF JUSTICE Parole Commission 28 CFR Part 2 [Docket No. USPC-2011-01] Preliminary Plan for Retrospective Review Under E.O. 13579 AGENCY: United States Parole Commission, Justice. ACTION: Request for comments. SUMMARY: The U.S. Parole Commission is asking for comments on its preliminary plan...

  10. Plans and Preliminary Results of Fundamental Studies of Ice Crystal Icing Physics in the NASA Propulsion Systems Laboratory

    Science.gov (United States)

    Struk, Peter; Tsao, Jen-Ching; Bartkus, Tadas

    2017-01-01

    This paper describes plans and preliminary results for using the NASA Propulsion Systems Lab (PSL) to experimentally study the fundamental physics of ice-crystal ice accretion. NASA is evaluating whether this facility, in addition to full-engine and motor-driven-rig tests, can be used for more fundamental ice-accretion studies that simulate the different mixed-phase icing conditions along the core flow passage of a turbo-fan engine compressor. The data from such fundamental accretion tests will be used to help develop and validate models of the accretion process. This paper presents data from some preliminary testing performed in May 2015 which examined how a mixed-phase cloud could be generated at PSL using evaporative cooling in a warmer-than-freezing environment.

  11. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  12. Preliminary Validation and Verification Plan for CAREM Reactor Protection System; Modelo de Plan Preliminar de Validacion y Verificacion para el Sistema de Proteccion del Reactor CAREM

    Energy Technology Data Exchange (ETDEWEB)

    Fittipaldi, Ana; Felix, Maciel [Comision Nacional de Energia Atomica, Centro Atomico Bariloche (Argentina)

    2000-07-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan.

  13. Preliminary waste acceptance requirements for the planned Konrad repository

    International Nuclear Information System (INIS)

    Warnecke, E.; Brennecke, P.

    1987-01-01

    The Physikalisch-Technische Bundesanstalt (PTB) has established Preliminary Waste Acceptance Requirements for the planned Konrad repository. These requirements were developed, in accordance with the Safety Criteria of the Reactor Safety Commission, with the help of a site specific safety assessment; they are under the reservation of the plan approval procedure, which is still in progress. In developing waste acceptance requirements, the PTB fulfills one of its duties as the institute responsible for waste disposal and gives guidelines for waste conditioning to waste producers and conditioners. (orig.) [de

  14. Business plan: A preliminary approach to an unknown genre

    Directory of Open Access Journals (Sweden)

    Federico Navarro

    2015-11-01

    Full Text Available The business plan has been widely included in the curricula of economics degrees and is key to business practice worldwide, but has not been studied from a socio-discursive perspective yet due to restrictions in its social, spatial, and temporal circulation. Based on interviews and a qualitative analysis of a corpus of 38 texts written in Spanish, I aim to provide a preliminary description of the genre. Results indicate that a chain of four phases is associated to a continuum of social settings organized through entrepreneurial/corporate and expert/training variables; its rhetorical structure includes “describing present/potential situation of the company and market” and “describing future processes of strategic actions regarding the marketing, production, and financial plans”. This analysis offers methodological innovations to account for occluded genres, encourages the contrastive study of the business plan in different cultural and linguistic environments, and assists business teachers with a situated picture of the genre

  15. Hydrogen Gas Retention and Release from WTP Vessels: Summary of Preliminary Studies

    Energy Technology Data Exchange (ETDEWEB)

    Gauglitz, Phillip A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bontha, Jagannadha R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Daniel, Richard C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mahoney, Lenna A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rassat, Scot D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wells, Beric E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bao, Jie [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Boeringa, Gregory K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Buchmiller, William C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Burns, Carolyn A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chun, Jaehun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Karri, Naveen K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Huidong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tran, Diana N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-07-01

    The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release from Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design

  16. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  17. 76 FR 81462 - Preliminary Plan for Retrospective Analysis of Existing Rules

    Science.gov (United States)

    2011-12-28

    ... economic development. The Commission seeks input from the public on all aspects of its preliminary plan... technological and economic opportunities of the new millennium. As part of the Commission's goal to be a model... to achieve its statutory objectives while removing burdens on industry and promoting innovation and...

  18. NRC staff preliminary analysis of public comments on advance notice of proposed rulemaking on emergency planning

    International Nuclear Information System (INIS)

    Peabody, C.A.; Hickey, J.W.N.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking on emergency planning on July 17, 1979 (44 FR 41483). In October and November 1979, the NRC staff submitted several papers to the Commission related to the emergency planning rulemaking. One of these papers was a preliminary analysis of public comments received on the advance notice (SECY-79-591B, November 13, 1979). This document consists of the preliminary analysis as it was submitted to the Commission, with minor editorial changes

  19. School Improvement Plans and Student Achievement: Preliminary Evidence from the Quality and Merit Project in Italy

    Science.gov (United States)

    Caputo, Andrea; Rastelli, Valentina

    2014-01-01

    This study provides preliminary evidence from an Italian in-service training program addressed to lower secondary school teachers which supports school improvement plans (SIPs). It aims at exploring the association between characteristics/contents of SIPs and student improvement in math achievement. Pre-post standardized tests and text analysis of…

  20. Preliminary experience with SpineEOS, a new software for 3D planning in AIS surgery.

    Science.gov (United States)

    Ferrero, Emmanuelle; Mazda, Keyvan; Simon, Anne-Laure; Ilharreborde, Brice

    2018-04-24

    Preoperative planning of scoliosis surgery is essential in the effective treatment of spine pathology. Thus, precontoured rods have been recently developed to avoid iatrogenic sagittal misalignment and rod breakage. Some specific issues exist in adolescent idiopathic scoliosis (AIS), such as a less distal lower instrumented level, a great variability in the location of inflection point (transition from lumbar lordosis to thoracic kyphosis), and sagittal correction is limited by both bone-implant interface. Since 2007, stereoradiographic imaging system is used and allows for 3D reconstructions. Therefore, a software was developed to perform preoperative 3D surgical planning and to provide rod's shape and length. The goal of this preliminary study was to assess the feasibility, reliability, and the clinical relevance of this new software. Retrospective study on 47 AIS patients operated with the same surgical technique: posteromedial translation through posterior approach with lumbar screws and thoracic sublaminar bands. Pre- and postoperatively, 3D reconstructions were performed on stereoradiographic images (EOS system, Paris, France) and compared. Then, the software was used to plan the surgical correction and determine rod's shape and length. Simulated spine and rods were compared to postoperative real 3D reconstructions. 3D reconstructions and planning were performed by an independent observer. 3D simulations were performed on the 47 patients. No difference was found between the simulated model and the postoperative 3D reconstructions in terms of sagittal parameters. Postoperatively, 21% of LL were not within reference values. Postoperative SVA was 20 mm anterior in 2/3 of the cases. Postoperative rods were significantly longer than precontoured rods planned with the software (mean 10 mm). Inflection points were different on the rods used and the planned rods (2.3 levels on average). In this preliminary study, the software based on 3D stereoradiography low

  1. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  2. Preliminary plan for decommissioning - repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    Hallberg, Bengt; Tiberg, Liselotte

    2010-06-01

    The final disposal facility for spent nuclear fuel is part of the KBS-3 system, which also consists of a central facility for interim storage and encapsulation of the spent nuclear fuel and a transport system. The nuclear fuel repository will be a nuclear facility. Regulation SSMFS 2008:1 (Swedish Radiation Safety Authority's regulations on safety of nuclear facilities) requires that the licensee must have a current decommissioning plan throughout the facility lifecycle. Before the facility is constructed, a preliminary decommissioning plan should be reported to the Swedish Radiation Safety Authority. This document is a preliminary decommissioning plan, and submitted as an attachment to SKB's application for a license under the Nuclear Activities Act to construct, own and operate the facility. The final disposal facility for spent nuclear fuel consists of an above ground part and a below ground part and will be built near Forsmark and the final repository for radioactive operational waste, SFR. The parts above and below ground are connected by a ramp and several shafts, e.g. for ventilation. The below ground part consists of a central area, and several landfill sites. The latter form the repository area. The sealed below ground part constitutes the final repository. The decommissioning is taking place after the main operation has ended, that is, when all spent nuclear fuel has been deposited and the deposition tunnels have been backfilled and plugged. The decommissioning involves sealing of the remaining parts of the below ground part and demolition of above ground part. When decommissioning begins, there will be no contamination in the facility. The demolition is therefore performed as for a conventional plant. Demolition waste is sorted and recycled whenever possible or placed in landfill. Hazardous waste is managed in accordance with current regulations. A ground investigation is performed and is the basis for after-treatment of the site. The timetable for the

  3. 78 FR 48159 - Preliminary 2012 Effluent Guidelines Program Plan and 2011 Annual Effluent Guidelines Review Report

    Science.gov (United States)

    2013-08-07

    ... publish a preliminary plan in the odd numbered years and a final plan in the even numbered years. The... necessary before concluding the review of the three remaining point source categories: Pulp, Paper and... standards for the 2012 reviews. These methodologies included: Identifying pass-through pollutants in sewage...

  4. Corporate Data Network (CDN). Data Requirements Task. Preliminary Strategic Data Plan. Volume 4

    International Nuclear Information System (INIS)

    1985-11-01

    The NRC has initiated a multi-year program to centralize its information processing in a Corporate Data Network (CDN). The new information processing environment will include shared databases, telecommunications, office automation tools, and state-of-the-art software. Touche Ross and Company was contracted with to perform a general data requirements analysis for shared databases and to develop a preliminary plan for implementation of the CDN concept. The Enterprise Model (Vol. 1) provided the NRC with agency-wide information requirements in the form of data entities and organizational demand patterns as the basis for clustering the entities into logical groups. The Data Dictionary (Vol.2) provided the NRC with definitions and example attributes and properties for each entity. The Data Model (Vol.3) defined logical databases and entity relationships within and between databases. The Preliminary Strategic Data Plan (Vol. 4) prioritized the development of databases and included a workplan and approach for implementation of the shared database component of the Corporate Data Network

  5. Preliminary decommissioning plan of the reactor IPEN-MB01

    International Nuclear Information System (INIS)

    Vivas, Ary de Souza

    2014-01-01

    Around the world, many nuclear plants were built and need to be turned off at a certain time because they are close to their recommended time of use is approximately 50 years. So the IAEA (International Atomic Energy Agency), seeks to guide and recommend a set of guidelines for the conduct of activities of nuclear facilities, with special attention to countries that do not have a framework regulatory Legal that sustain the activities of decommissioning. Brazil, so far, does not have a specific standard to guide the steps of the guidelines regarding decommissioning research reactors. However, in March 2011 a study committee was formed with the main task facing the issues of decommissioning of nuclear installations in Brazil, culminating in Resolution 133 of November 8, 2012, a standard project that treat about the Decommissioning of nucleoelectric plants. O Instituto de Pesquisas Energeticas e Nucleares (IPEN) has two research reactors one being the reactor IPEN/MB-01. The purpose of this master dissertation is to develop a preliminary plan for decommissioning this research reactor, considering the technical documentation of the facility (RAS-Safety Analysis Report), the existing standards of CNEN (National Nuclear Energy Commission), as well as IAEA recommendations. In terms of procedures for decommissioning research reactors, this work was based on what is most modern in experiences, strategies and lessons learned performed and documented in IAEA publications covering techniques and technologies for decommissioning. Considering these technical knowledge and due to the peculiarities of the facility, was selected to immediate dismantling strategy, which corresponds to the start of decommissioning activities once the installation is switched off, dividing it into work sectors. As a resource for monitoring and project management of reactor decommissioning and maintenance of records, we developed a database using Microsoft Access 2007, which contain all the items and

  6. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  7. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  8. Site study plan for regional hydrologic sampling and monitoring: Preliminary draft

    International Nuclear Information System (INIS)

    Dutton, A.R.

    1987-01-01

    The purpose of the Regional Hydrologic Studies Plan is to describe those field activities required for completion of the objectives of hydrologic activities. Many of these activities are regional in scope and are designed to provide a framework for understanding the hydrologic setting of the site and the hydrologic processes that influence site characteristics. Site Study Plans (SSPs) define activates at and in the immediate vicinity of the site. The activities specified in the Regional Hydrologic Studies Plan are performed beyond the confines of the site because the hydrologic systems extend beyond the site boundaries, because pertinent data that bear on site suitability are available outside of the site, and because natural analogues exist outside of the site that allow analysis of processes that are expected to operate within the site. 15 refs., 5 figs., 1 tab

  9. A preliminary study on cone beam CT image based treatment planning

    International Nuclear Information System (INIS)

    Padmanaban, Sriram; Jeevanandham, Prakash; Boopathy, Raghavendiran; Sukumar, Prabakar; Syam Kumar, S.A.; Kunjithapatham, Bhuvana; Nagarajan, Vivekanandan

    2008-01-01

    Kilovolt Cone beam computed tomography (CBCT) based on flat panel technology is primarily used for positioning verification. However it is required to evaluate the accuracy of dose calculation based on CBCT images for the purpose of re-planning in adaptive radiation therapy (ART). In this study, 3DCRT and IMRT plans were done using both the planning CT and CBCT images and the corresponding variations in dose and MUs were analyzed, hence evaluating the feasibility of using kilovolt CBCT for dose calculation and patient dose verification. (author)

  10. Solar Central Receiver Prototype Heliostat. Volume II. Phase II planning (preliminary)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    A currently planned DOE program will develop and construct a 10 MW/sub e/ Pilot Plant to demonstrate the feasibility and operational characteristics of Solar Central Receiver Power Generation. The field of heliostats is a major element of the Solar Central Receiver Power Generation system. The primary objective of the program described is to establish and verify the manufacturability, performance, durability, and maintenance requirements of the commercial plant heliostat design. End products of the 16 month effort include: (1) design, fabrication, and test of heliostats; (2) preliminary designs of manufacturing, assembly, installation, and maintenance processes for quantity production; (3) detailed design of critical tooling or other special equipment for such processes; (4) refined cost estimates for heliostats and maintenance; and (5) an updated commercial plant heliostat preliminary design. The program management and control system is discussed. (WHK)

  11. Energy and nuclear power planning study for Algeria

    International Nuclear Information System (INIS)

    1985-01-01

    This study, conducted jointly by a team of engineers and economists from the Sonelgaz company and the IAEA, had three objectives: (1) To perform a preliminary economic study aimed at initiating thinking on the role that nuclear power could play in Algeria's long-term energy structure and to suggest reasonable hypotheses on what share of the energy market nuclear power might supply. (2) To train a team of Algerian engineers and economists in long-term economic planning techniques. Once the team has gained a basic knowledge through this preliminary study, it will be in a position to continue the process, to perform other, more detailed independent analyses and to review the entire process should economic conditions change. (3) To introduce in Algeria the computer techniques and facilities needed to carry out such energy investment planning studies for electricity production. The main aim throughout the studies was to train a team of Algerian engineers in energy planning rather than to come to definitive conclusions on the problem of introducing nuclear power in Algeria. Two successive analyses were performed. The first consisted in evaluating the final energy requirements which will result in the medium and long term (by 2015) from the implementation of the economic development policies in the Five Year Plan (up to 1984) and in the proposals for the next decade (up to 1990) being studied by the Algerian Ministry of Planning. The second part is concerned only with the results regarding future electricity requirements, which are used as input data in studying the optimization of Algeria's future electricity generating system. Various methods of generation are analysed and included in an econometric model in order to make a sequential determination of the most economic composition of power generating capacity

  12. A Preliminary Version of Heavy Ion Treatment Planning System at IMP

    International Nuclear Information System (INIS)

    Liu Xinguo; Dai Zhongying; Ye Fei; Wu Qingfeng; Li Ping; Li Qiang; Jin Xiaodong; Du Xiaogang; WangYangping; Dang Jianwu

    2010-01-01

    Based on the Heavy Ion Research Facility in Lanzhou (HIRFL/HIRFL-CSR), clinical trials of heavy ion radiotherapy are being conducted at the Institute of Modern Physics (IMP), Chinese Academy of Sciences, where two-dimensional(2D) layer-stacking conformal irradiation method in a passive beam delivery system was applied. To make better use of the biophysical advantages of heavy ion beams and ensure success of the clinical trials, a preliminary version of heavy ion treatment planning system (TPS) has been developed at IMP. The TPS was designed in a manner to adapt to the 2D layer-stacking conformal irradiation method. The architecture and function of the TPS software and the implementation of dose calculation algorithm in the TPS were introduced in this paper.The deviation between the doses planned by the TPS and measured through an anthropomorphous phantom was verified to be less than 5%. Finally,the pending issues for developing a sophisticated treatment planning system at IMP were discussed. (authors)

  13. Preliminary socioeconomic and community planning studies

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Goldie W; Rivkin, Malcolm D [Rivkin Associates, Bethesda, MD (United States)

    1986-07-01

    The timing of resettlement on Bikini Atoll and the nature of a master plan to guide construction of a new community depend on four critical determinants which are not yet definitively known. The Bikini Atoll Rehabilitation Committee (BARC) and its consultants have been addressing three of these: a. How long it will take to restore Bikini Island, which will be the main settlement area, to a habitable state. The methods under investigation by BARC for decontaminating the island might be considered as alternatives or, possibly in combination. They vary considerably, not only with respect to cost, but also with respect to important factors such as: - how long it will take to decontaminate the island (i.e. to reduce radiation to levels acceptable within Federal standards), - the necessity of removing existing vegetation and the time and effort needed to restore environment and vegetation to a state sufficient to support a new community at a reasonable standard of amenity, - requirements for repeated or continual application of decontamination procedures (and associated risks), and - implications for potential constraints on the lifestyle of the people who resettle on Bikini Island. b. Adequacy of water resources (groundwater and rainwater catchment potential) on Bikini and Eneu Islands to support both revegetation as necessary, and a new community. c. The likely state of the Bikini people (size of the population, location(s), living conditions, financial commitments, etc.) at the time their atoll is ready for resettlement. d. The judgment and wishes of the Bikini people regarding a community plan in light of all the foregoing factors, once they become known.

  14. Preliminary socioeconomic and community planning studies

    International Nuclear Information System (INIS)

    Rivkin, Goldie W.; Rivkin, Malcolm D.

    1986-01-01

    The timing of resettlement on Bikini Atoll and the nature of a master plan to guide construction of a new community depend on four critical determinants which are not yet definitively known. The Bikini Atoll Rehabilitation Committee (BARC) and its consultants have been addressing three of these: a. How long it will take to restore Bikini Island, which will be the main settlement area, to a habitable state. The methods under investigation by BARC for decontaminating the island might be considered as alternatives or, possibly in combination. They vary considerably, not only with respect to cost, but also with respect to important factors such as: - how long it will take to decontaminate the island (i.e. to reduce radiation to levels acceptable within Federal standards), - the necessity of removing existing vegetation and the time and effort needed to restore environment and vegetation to a state sufficient to support a new community at a reasonable standard of amenity, - requirements for repeated or continual application of decontamination procedures (and associated risks), and - implications for potential constraints on the lifestyle of the people who resettle on Bikini Island. b. Adequacy of water resources (groundwater and rainwater catchment potential) on Bikini and Eneu Islands to support both revegetation as necessary, and a new community. c. The likely state of the Bikini people (size of the population, location(s), living conditions, financial commitments, etc.) at the time their atoll is ready for resettlement. d. The judgment and wishes of the Bikini people regarding a community plan in light of all the foregoing factors, once they become known

  15. Personal strategic planning mobile application: preliminary study ...

    African Journals Online (AJOL)

    With the recent advances in the capabilities of smartphones and their growing penetration rate among the individuals, it is possible to take advantage of these devices to design a mobile application to promote personal strategic planning. The paper reviews relevant literature and designs an instrument to investigate the ...

  16. Preliminary inspection of secondary cooling system piping for maintenance plan in JMTR

    International Nuclear Information System (INIS)

    Hanakawa, Hiroki; Hanawa, Yoshio; Izumo, Hironobu; Fukasaku, Akitomi; Nagao, Yoshiharu; Miyazawa, Masataka; Niimi, Motoji

    2008-01-01

    The JMTR is under the refurbishment and will start on FY 2011. The JMTR will operate for about 20 years from 2011. Before this JMTR operation, preliminary inspection of secondary cooling system piping was carried out in order to make a maintenance plan. As the results of this inspection, it was confirmed that the corrosion was reached by piping ingot, or decrease of piping thickness could hardly be observed. Therefore, it was confirmed that the strength or the functionality of the piping had been maintained by usual operation and maintenance. According to the results of this inspection, the basic date for maintenances are confirmed and it is clear to be able to make the maintenances plan in future. (author)

  17. The preliminary planning for decommissioning nuclear facilities in Taiwan

    International Nuclear Information System (INIS)

    Li, K.K.

    1993-01-01

    During the congressional hearing in 1992 for a $7 billion project for approval of the fourth nuclear power plant, the public was concerned about the decommissioning of the operating plants. In order to facilitate the public acceptance of nuclear energy and to secure the local capability for appropriate nuclear backend management, both technologically and financially, it is important to have preliminary planning for decommissioning the nuclear facilities. This paper attempted to investigate the possible scope of decommissioning activities and addressed the important regulatory, financial, and technological aspects. More research and development works regarding the issue of decommissioning are needed to carry out the government's will of decent management of nuclear energy from the cradle to the grave

  18. Formulating a preliminary business plan for a business consultancy company : case: CreaNets Business Development and Consultancy

    OpenAIRE

    Korkmaz, Gökhan

    2015-01-01

    The main purpose of this research is to formulate a preliminary business plan for a business consultancy which will operate between Finland and Turkey and be headquartered in Finland. The research focuses on practical information on entrepreneurship, business planning and business models as well as starting up a new business in Finland. During the theoretical framework, information is provided on entrepreneurship and business planning. Hoffren’s Dynamic Business Model and Osterwalder’s Bu...

  19. CAREER PLANS OF GRADUATES OF A CANADIAN DENTAL SCHOOL: PRELIMINARY REPORT OF A 5-YEAR SURVEY.

    Science.gov (United States)

    Nassar, Usama; Fairbanks, Connor; Flores-Mir, Carlos; Kilistoff, Alan; Easton, Rick

    2016-07-01

    Comprehensive data on the characteristics and opinions of graduating dental students in Canada are lacking. Specifically, only minimal information is available on graduates' immediate career plans and factors that may influence their decisions regarding these plans. Our aim was to gather such data to allow better understanding of this issue and improve the design of future studies on this topic. The Career Development Committee at the school of dentistry, University of Alberta, designed a short survey to be administered to graduating students over 5 years to gain insight into their immediate career plans and opinions on career services at the school. Preliminary results from 2012-2014 are reported here. With a response rate of close to 90% (n = 99/111), the data reveal considerable differences in immediate career plans between the surveyed students and those in other schools in Canada and the United States. Of the students, 89% were planning to work in a general dental practice and only 9% were planning to enroll in advanced education, including general practice residency training. More research is needed to better understand the factors affecting career path decisions of students.

  20. LASL experimental engineered waste burial facility: design considerations and preliminary plan

    International Nuclear Information System (INIS)

    DePoorter, G.L.

    1980-01-01

    The LASL Experimental Engineered Waste Burial Facility is a part of the National Low-Level Waste Management Program on Shallow-Land Burial Technology. It is a test facility where basic information can be obtained on the processes that occur in shallow-land burial operations and where new concepts for shallow-land burial can be tested on an accelerated basis on an appropriate scale. The purpose of this paper is to present some of the factors considered in the design of the facility and to present a preliminary description of the experiments that are initially planned. This will be done by discussing waste management philosophies, the purposes of the facility in the context of the waste management philosophy for the facility, and the design considerations, and by describing the experiments initially planned for inclusion in the facility, and the facility site

  1. The Preliminary Decommissioning Plan of the Dalat Nuclear Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lam, Pham Van; Vien, Luong Ba; Vinh, Le Vinh; Nghiem, Huynh Ton; Tuan, Nguyen Minh; Phuong, Pham Hoai [Nuclear Research Institute, Da Lat (Viet Nam)

    2013-08-15

    Recently, after 25 years of operation, a preliminary decommissioning plan for the Dalat Nuclear Research Reactor (DNRR) has been produced but as yet it has not been implemented due to the continued operations of the reactor. However, from the early phases of facility design and construction and during operation, the aspects that facilitate decommissioning process have been considered. This paper outlines the DNRR general description, the organization that manages the facility, the decommissioning strategy and associated project management, and the expected decommissioning activities. The paper also considers associated cost and funding, safety and environmental issues and waste management aspects amongst other considerations associated with decommissioning a nuclear research reactor. (author)

  2. Development of a preliminary decommissioning plan of the reactor IPEN/MB-01

    International Nuclear Information System (INIS)

    Vivas, Ary de Souza; Carneiro, Alvaro Luiz Guimaraes

    2013-01-01

    Around the world, many nuclear plants were built and need to be turned off at a certain time because they are close to their recommended time of use is approximately 50 years. So the IAEA (International Atomic Energy Agency), seeks to guide and recommend, through publications, guidelines for the conduct of activities both for decommissioning nuclear power plants and for research reactors, with special attention to countries that do not have a framework regulatory Legal that sustain the activities of decommissioning. Brazil, so far, does not have a specific standard to guide the steps of the guidelines regarding decommissioning research reactors, having only a standard applied to decommissioning power plants which was published in November 2012. The Nuclear and Energy Research Institute (IPEN) has two research reactors one being the reactor IPEN/MB-01. The aim of this work is to develop a preliminary plan for decommissioning of nuclear reactor research, considering the technical documentation of the system (RAS-Safety Analysis Report), the existing rules of CNEN (National Nuclear Energy Commission), as well as regulatory instructions and recommendations of the IAEA. The preliminary decommissioning plan consists of the presentation of actions and steps required as well as the strategies to be adopted for the shutdown of the facility under the technical and administrative, seeking the safety, health workers and the general public, minimizing environmental impacts. (author)

  3. Preliminary plan for decommissioning - repository for spent nuclear fuel; Preliminaer plan foer avveckling - slutfoervar foer anvaent kaernbraensle

    Energy Technology Data Exchange (ETDEWEB)

    Hallberg, Bengt; Tiberg, Liselotte (Studsvik Nuclear AB, Nykoeping (Sweden))

    2010-06-15

    The final disposal facility for spent nuclear fuel is part of the KBS-3 system, which also consists of a central facility for interim storage and encapsulation of the spent nuclear fuel and a transport system. The nuclear fuel repository will be a nuclear facility. Regulation SSMFS 2008:1 (Swedish Radiation Safety Authority's regulations on safety of nuclear facilities) requires that the licensee must have a current decommissioning plan throughout the facility lifecycle. Before the facility is constructed, a preliminary decommissioning plan should be reported to the Swedish Radiation Safety Authority. This document is a preliminary decommissioning plan, and submitted as an attachment to SKB's application for a license under the Nuclear Activities Act to construct, own and operate the facility. The final disposal facility for spent nuclear fuel consists of an above ground part and a below ground part and will be built near Forsmark and the final repository for radioactive operational waste, SFR. The parts above and below ground are connected by a ramp and several shafts, e.g. for ventilation. The below ground part consists of a central area, and several landfill sites. The latter form the repository area. The sealed below ground part constitutes the final repository. The decommissioning is taking place after the main operation has ended, that is, when all spent nuclear fuel has been deposited and the deposition tunnels have been backfilled and plugged. The decommissioning involves sealing of the remaining parts of the below ground part and demolition of above ground part. When decommissioning begins, there will be no contamination in the facility. The demolition is therefore performed as for a conventional plant. Demolition waste is sorted and recycled whenever possible or placed in landfill. Hazardous waste is managed in accordance with current regulations. A ground investigation is performed and is the basis for after-treatment of the site. The timetable

  4. Preliminary Technology Maturation Plan for Immobilization of High-Level Waste in Glass Ceramics

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Crum, Jarrod V.; Sevigny, Gary J.; Smith, G L.

    2012-09-30

    A technology maturation plan (TMP) was developed for immobilization of high-level waste (HLW) raffinate in a glass ceramics waste form using a cold-crucible induction melter (CCIM). The TMP was prepared by the following process: 1) define the reference process and boundaries of the technology being matured, 2) evaluate the technology elements and identify the critical technology elements (CTE), 3) identify the technology readiness level (TRL) of each of the CTE’s using the DOE G 413.3-4, 4) describe the development and demonstration activities required to advance the TRLs to 4 and 6 in order, and 5) prepare a preliminary plan to conduct the development and demonstration. Results of the technology readiness assessment identified five CTE’s and found relatively low TRL’s for each of them: • Mixing, sampling, and analysis of waste slurry and melter feed: TRL-1 • Feeding, melting, and pouring: TRL-1 • Glass ceramic formulation: TRL-1 • Canister cooling and crystallization: TRL-1 • Canister decontamination: TRL-4 Although the TRL’s are low for most of these CTE’s (TRL-1), the effort required to advance them to higher values. The activities required to advance the TRL’s are listed below: • Complete this TMP • Perform a preliminary engineering study • Characterize, estimate, and simulate waste to be treated • Laboratory scale glass ceramic testing • Melter and off-gas testing with simulants • Test the mixing, sampling, and analyses • Canister testing • Decontamination system testing • Issue a requirements document • Issue a risk management document • Complete preliminary design • Integrated pilot testing • Issue a waste compliance plan A preliminary schedule and budget were developed to complete these activities as summarized in the following table (assuming 2012 dollars). TRL Budget Year MSA FMP GCF CCC CD Overall $M 2012 1 1 1 1 4 1 0.3 2013 2 2 1 1 4 1 1.3 2014 2 3 1 1 4 1 1.8 2015 2 3 2 2 4 2 2.6 2016 2 3 2 2 4 2 4

  5. Nevada potential repository preliminary transportation strategy Study 2. Volume 1

    International Nuclear Information System (INIS)

    1996-02-01

    The objectives of this study were to build on the findings of the Nevada Potential Repository Preliminary Transportation Strategy Study 1 (CRWMS M ampersand O 1995b), and to provide additional information for input to the repository environmental impact statement (EIS) process. In addition, this study supported the future selection of a preferred rail corridor and/or heavy haul route based on defensible data, methods, and analyses. Study research did not consider proposed legislation. Planning was conducted according to the Civilian Radioactive Waste Management Program Plan (DOE 1994a). The specific objectives of Study 2 were to: eliminate or reduce data gaps, inconsistencies, and uncertainties, and strengthen the analysis performed in Study 1; develop a preliminary list of rail route evaluation criteria that could be used to solicit input from stakeholders during scoping meetings. The evaluation criteria will be revised based on comments received during scoping; restrict and refine the width of the four rail corridors identified in Study 1 to five miles or less, based on land use constraints and engineering criteria identified and established in Study 2; evaluate national-level effects of routing spent nuclear fuel and high-level waste to the four identified branch lines, including the effects of routing through or avoiding Las Vegas; continue to gather published land use information and environmental data to support the repository EIS; continue to evaluate heavy haul truck transport over three existing routes as an alternative to rail and provide sufficient information to support the repository EIS process; and evaluate secondary uses for rail (passenger use, repository construction, shared use)

  6. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  7. Dry-run of site investigation planning using the manual for preliminary investigation in Japan

    International Nuclear Information System (INIS)

    Akamura, Shigeki; Miwa, Tadashi; Tanaka, Tatsuya; Shiratsuchi, Hiroshi; Horio, Atsushi

    2011-01-01

    A stepwise site selection process has been adopted for geological disposal of HLW in Japan. Literature surveys, followed by preliminary investigations (PI) and, finally, detailed investigations in underground facilities will be carried out in the successive selection stages. In the PI stage, surface-based investigations such as borehole surveys and geophysical prospecting will be implemented. In order to conduct the PI appropriately and efficiently within a restricted timeframe and budget, planning and management of PI are very important. NUMO therefore compiled existing knowledge and experience in the planning and managing of investigations in the form of manuals to be used to improve and maintain internal expertise. The first editions of the two manuals were prepared on the basis of experience overseas, and then they were revised by taking technological environment, laws and regulation in Japan into consideration. This paper introduces the procedure of PI planning using manual as well as the results of the dry-run, with the Yokosuka area as a hypothetical PI area, where the monstraction study is under way. Based on the dry-run, applicability of the manual is checked and, at the same time, further revisions are made to improve the content. (author)

  8. Theory and Praxis in Community Based Language Development: preliminary findings from applications of the Guide for Planning the Future of Our Language

    OpenAIRE

    Eberhard David M.

    2017-01-01

    This study will provide a critique of preliminary results obtained from the application of the ‘Guide for Planning the Future of Our Language’ (Hanawalt, Varenkamp, Lahn, & Eberhard 2015) in minority speech communities. This recent methodological tool was developed to enable and empower minoritized language groups to do their own language planning and to control their own language development. The tool is based on a theoretical approach to community based language development known as the ‘Su...

  9. Preliminary business plan: Plzen district heating system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The district heating system of the City of Plzen, Czech Republic, needs to have physical upgrades to replace aging equipment and to comply with upcoming environmental regulations. Also, its ownership and management are being changed as a result of privatization. As majority owner, the City has the primary goal of ensuring that the heating needs of its customers are met as reliably and cost-effectively as possible. This preliminary business plan is part of the detailed analysis (5 reports in all) done to assist the City in deciding the issues. Preparation included investigation of ownership, management, and technology alternatives; estimation of market value of assets and investment requirements; and forecasting of future cash flow. The district heating system consists of the Central Plzen cogeneration plant, two interconnected heating plants [one supplying both hot water and steam], three satellite heating plants, and cooperative agreements with three industrial facilities generating steam and hot water. Most of the plants are coal-fired, with some peaking units fired by fuel oil.

  10. Site Study Plan for salt, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Salt Site Study Plan (SSP) describes a program for characterizing the existing salt environment in the site vicinity. A step-by-step approach is described which proceeds from published data and planned theoretical studies, to planned laboratory studies, and finally to planned field studies, to provide the necessary data to meet program requirements contained in the Salt Repository Project - Requirements Document (SRP-RD). The plan also draws on the results of other SSP's for certain data; for example, soil salinity data are to be provided under the Soils SSP. The salt studies consist of evaluation of control and mitigation measures, salt monitoring studies, emission factors development, air models development and validation, and risk assessment. For each study, its design and design rationale; analysis, management, and use of data; schedule of activities; organization of personnel and sample management; and quality assurance requirements are described. 90 refs., 9 figs., 7 tabs

  11. Equity in transportation: new approach in transport planningpreliminary results of case study in Cracow

    Directory of Open Access Journals (Sweden)

    Lidia ZAKOWSKA

    2014-09-01

    Full Text Available The goal of the paper is to present the concept of equity as a new approach in transport and land-use planning. This concept is consistent with the objectives of sustainable development and it is becoming more common in European and world literature. Understanding the idea of equity in the context of the transport system development is very important in creating sustainable cities and regions without discriminating any social groups and creating a cohesive society not exposed to social exclusion due to lack of access to primary and secondary activities. The paper presents some results of the preliminary analysis on transport equity in Cracow. The basic equity level which has been considered here concerns senior citizens, older people living in Cracow area, in terms of their accessibility to transport infrastructure. Taking into account living conditions of elderly pedestrians, contour measures were used, in order to determine accessibility as equity indicator.

  12. Preliminary assessments the shortcut to remediation (category III-surplus facility assessments)

    International Nuclear Information System (INIS)

    Byars, L.L.

    1995-01-01

    This report presents the details of the preliminary assessments for the shortcut of decontamination of surplus nuclear facilities. Topics discussed include: environment, health and safety concerns; economic considerations; reduction of transition time; preliminary characterization reports; preliminary project plan; health and safety plan; quality assurance plan; surveillance and maintenance plan; and waste management plan

  13. Partitioning planning studies: Preliminary evaluation of metal and radionuclide partitioning the high-temperature thermal treatment systems

    International Nuclear Information System (INIS)

    Liekhus, K.; Grandy, J.; Chambers, A.

    1997-03-01

    A preliminary study of toxic metals and radionuclide partitioning during high-temperature processing of mixed waste has been conducted during Fiscal Year 1996 within the Environmental Management Technology Evaluation Project. The study included: (a) identification of relevant partitioning mechanisms that cause feed material to be distributed between the solid, molten, and gas phases within a thermal treatment system; (b) evaluations of existing test data from applicable demonstration test programs as a means to identify and understand elemental and species partitioning; and, (c) evaluation of theoretical or empirical partitioning models for use in predicting elemental or species partitioning in a thermal treatment system. This preliminary study was conducted to identify the need for and the viability of developing the tools capable of describing and predicting toxic metals and radionuclide partitioning in the most applicable mixed waste thermal treatment processes. This document presents the results and recommendations resulting from this study that may serve as an impetus for developing and implementing these predictive tools

  14. Partitioning planning studies: Preliminary evaluation of metal and radionuclide partitioning the high-temperature thermal treatment systems

    Energy Technology Data Exchange (ETDEWEB)

    Liekhus, K.; Grandy, J.; Chambers, A. [and others

    1997-03-01

    A preliminary study of toxic metals and radionuclide partitioning during high-temperature processing of mixed waste has been conducted during Fiscal Year 1996 within the Environmental Management Technology Evaluation Project. The study included: (a) identification of relevant partitioning mechanisms that cause feed material to be distributed between the solid, molten, and gas phases within a thermal treatment system; (b) evaluations of existing test data from applicable demonstration test programs as a means to identify and understand elemental and species partitioning; and, (c) evaluation of theoretical or empirical partitioning models for use in predicting elemental or species partitioning in a thermal treatment system. This preliminary study was conducted to identify the need for and the viability of developing the tools capable of describing and predicting toxic metals and radionuclide partitioning in the most applicable mixed waste thermal treatment processes. This document presents the results and recommendations resulting from this study that may serve as an impetus for developing and implementing these predictive tools.

  15. A Preliminary Assessment of Daily Weather Conditions in Nuclear Site for Development of Effective Emergency Plan

    International Nuclear Information System (INIS)

    Han, Seok Jung; Ahn, Kwang Il

    2012-01-01

    A radiological emergency preparedness for nuclear sites is recognized as an important measure against anticipated severe accidents with environmental releases of radioactive materials. While there are many individual means in the emergency preparedness for nuclear accidents, one of most important means is to make a decision of evacuation or shelter of the public residents with the emergency plan zone (EPZ) of a nuclear site. In order to prepare an effective strategy for the evacuation as a basis of the emergency preparedness, it may need the understanding of atmospheric dispersion characteristics of radiation releases to the environment, mainly depending upon the weather conditions of a radiation releases location, i.e., a nuclear site. As a preliminary study for the development of an effective emergency plan, the basic features of the weather conditions of a specific site were investigated. A main interest of this study is to identify whether or not the site weather conditions have specific features helpful for a decision making of evacuation of the public residents

  16. Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361

    International Nuclear Information System (INIS)

    Moshonas Cole, Katherine; Dinner, Julia; Grey, Mike; Daniska, Vladimir

    2013-01-01

    The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

  17. HACCP and water safety plans in Icelandic water supply: preliminary evaluation of experience.

    Science.gov (United States)

    Gunnarsdóttir, María J; Gissurarson, Loftur R

    2008-09-01

    Icelandic waterworks first began implementing hazard analysis and critical control points (HACCP) as a preventive approach for water safety management in 1997. Since then implementation has been ongoing and currently about 68% of the Icelandic population enjoy drinking water from waterworks with a water safety plan based on HACCP. Preliminary evaluation of the success of HACCP implementation was undertaken in association with some of the waterworks that had implemented HACCP. The evaluation revealed that compliance with drinking water quality standards improved considerably following the implementation of HACCP. In response to their findings, waterworks implemented a large number of corrective actions to improve water safety. The study revealed some limitations for some, but not all, waterworks in relation to inadequate external and internal auditing and a lack of oversight by health authorities. Future studies should entail a more comprehensive study of the experience with the use of HACCP with the purpose of developing tools to promote continuing success.

  18. Suggestions and comments about preliminary plans of ABNT 20:04.002-001 standard 'Seismic actions for nuclear facilities project'

    International Nuclear Information System (INIS)

    Soares, W.A.

    1984-01-01

    This paper presents an analysis of preliminary plans of standard 'seismic actions for nuclear facilities project'. This document presents since seismic event characterization up to details of structural project of nuclear facilities construction. (C.M.)

  19. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results

    International Nuclear Information System (INIS)

    Turcotte, R.; Fortin, L.G.; Pugin, S.; Cyr, J.F.; Picard, F.; Poirier, C.; Lacombe, P.

    2004-01-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs

  20. Site study plan for Transportation, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site study plan describes transportation field studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. The studies are needed to identify and assess potential project impacts to transportation infrastructure and systems in the project vicinity and along potential transportation routes to the site across the State of Texas. The studies are also needed to locate and design project transportation facilities, and to evaluate and design impact mitigation. After identifying the transportation information requirements needed to comply with Federal, State, and local regulations and repository program requirements, the site study plan describes the study design and rationale, the field data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs for the characterization of site vicinity rail corridors and highway corridors, characterization of alternative statewide transportation routes, monitoring of site characterization effects on transportation, characterization of aircraft overflight patterns and hazardous material transportation patterns, and assessment of emergency response preparedness along alternative statewide transportation routes. 34 refs., 10 figs., 2 tabs

  1. Poster - 56: Preliminary comparison of FF- and FFF-VMAT for prostate plans with higher rectal dose

    International Nuclear Information System (INIS)

    Liu, Baochang; Darko, Johnson; Osei, Ernest

    2016-01-01

    Purpose: A recent retrospective study found 53 patients previously treated to 78Gy/39 using flattened filtered (FF) 6X-VMAT at GRRCC had rectal DVH more than one standard deviation higher than the average. This study was to investigate if using 6FFFor10FFF beams could reduce these DVHs without compromising target coverage. Methods: Twenty patients’ plans were re-planed with 2-arc 6X-VMAT, 6FFF-VMAT and 10FFF-VMAT using the Eclipse TPS following departmental protocol. All plans had the same optimization and normalization, and were evaluated against the acceptance criteria from the QUANTEC and Emami. Statistical differences in the mean dose to OARs (D m ) and PTV homogeneity index (HI) between energies were tested using the paired sample Wilcoxon signed rank statistical method (p<0.05). Beam delivery accuracy was checked on five patients using portal dosimetry (PD). Results: The PTV HI for the 10FFF shows no statistical difference from the 6X. All the OARs, except left femoral head with 6FFF, have significantly lower Dm using 6FFF and 10FFF .There is no difference in the maximum doses to rectum and bladder and are limited by the prescribed doses. Measurements show good agreements in the gamma evaluation (3%/3mm) for all energies. Conclusion: This preliminary study shows that doses to the OARs are reduced using 10FFF for the same target coverage. The plans using 6FFF result in lower doses to some OARs, and statistically different PTV HI. All plans showed very good agreement with measurements.

  2. Poster - 56: Preliminary comparison of FF- and FFF-VMAT for prostate plans with higher rectal dose

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Baochang; Darko, Johnson; Osei, Ernest [Grand River Regional Cancer Centre, Kitchener, Ontario (Canada)

    2016-08-15

    Purpose: A recent retrospective study found 53 patients previously treated to 78Gy/39 using flattened filtered (FF) 6X-VMAT at GRRCC had rectal DVH more than one standard deviation higher than the average. This study was to investigate if using 6FFFor10FFF beams could reduce these DVHs without compromising target coverage. Methods: Twenty patients’ plans were re-planed with 2-arc 6X-VMAT, 6FFF-VMAT and 10FFF-VMAT using the Eclipse TPS following departmental protocol. All plans had the same optimization and normalization, and were evaluated against the acceptance criteria from the QUANTEC and Emami. Statistical differences in the mean dose to OARs (D{sub m}) and PTV homogeneity index (HI) between energies were tested using the paired sample Wilcoxon signed rank statistical method (p<0.05). Beam delivery accuracy was checked on five patients using portal dosimetry (PD). Results: The PTV HI for the 10FFF shows no statistical difference from the 6X. All the OARs, except left femoral head with 6FFF, have significantly lower Dm using 6FFF and 10FFF .There is no difference in the maximum doses to rectum and bladder and are limited by the prescribed doses. Measurements show good agreements in the gamma evaluation (3%/3mm) for all energies. Conclusion: This preliminary study shows that doses to the OARs are reduced using 10FFF for the same target coverage. The plans using 6FFF result in lower doses to some OARs, and statistically different PTV HI. All plans showed very good agreement with measurements.

  3. Site Study Plan for Acoustics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Acoustics site study plan describes a field program which characterizes existing sound levels, determines the area's sound propagation characteristics, and monitors the project-related sound emissions. The plan describes for each study: the need for the study, study design, data management and use, schedule, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Requirements Document. 37 refs., 9 figs., 3 tabs

  4. The preliminary study of the quench protection of an MgB2

    Science.gov (United States)

    Juster, F. P.; Berriaud, C.; Bonelli, A.; Pasquet, R.; Przybilski, H.; Schild, T.; Scola, L.

    2014-01-01

    In the framework of general studies currently carried out at CEA/Saclay in collaboration with Sigmaphi Company on dry MgB2 magnet operating at 10 K and medium range field, 1 T up to 4 T., we plan to build a prototype-coil with a commercial MgB2 wire. This coil, the nominal axial magnetic field of which is 1 tesla, will be placed in a 3 teslas background field generated by a classical NbTi coil. This paper deals with the preliminary quench protection studies including stability and quench propagation modeling.

  5. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  6. A preliminary conceptual design study for Korean fusion DEMO reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Keeman, E-mail: kkeeman@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahak-ro, Daejeon 305-806 (Korea, Republic of); Kim, Hyoung Chan; Oh, Sangjun; Lee, Young Seok; Yeom, Jun Ho; Im, Kihak; Lee, Gyung-Su [National Fusion Research Institute, 169-148 Gwahak-ro, Daejeon 305-806 (Korea, Republic of); Neilson, George; Kessel, Charles; Brown, Thomas; Titus, Peter [Princeton Plasma Physics Laboratory, Princeton University, Princeton, NJ 08543 (United States)

    2013-10-15

    Highlights: ► Perform a preliminary conceptual study for a steady-state Korean DEMO reactor. ► Present design guidelines and requirements of Korean DEMO reactor. ► Present a preliminary design of TF (toroidal field) and CS (central solenoid) magnet. ► Present a preliminary result of the radial build scheme of Korean DEMO reactor. -- Abstract: As the ITER is being constructed, there is a growing anticipation for an earlier realization of fusion energy, so called fast-track approach. Korean strategy for fusion energy can be regarded as a fast-track approach and one special concept discussed in this paper is a two-stage development plan. At first, a steady-state Korean DEMO Reactor (K-DEMO) is designed not only to demonstrate a net electricity generation and a self-sustained tritium cycle, but also to be used as a component test facility. Then, at its second stage, a major upgrade is carried out by replacing in-vessel components in order to show a net electric generation on the order of 300 MWe and the competitiveness in cost of electricity (COE). The major radius is designed to be just below 6.5 m, considering practical engineering feasibilities. By using high performance Nb{sub 3}Sn-based superconducting cable currently available, high magnetic field at the plasma center above 8 T can be achieved. A design concept for TF magnets and radial builds for the K-DEMO considering a vertical maintenance scheme, are presented together with preliminary design parameters.

  7. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  8. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  9. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    Energy Technology Data Exchange (ETDEWEB)

    Cox, S.; Benioff, R.

    2011-05-01

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  10. Comprehensive development plans for the low- and intermediate-level radioactive waste disposal facility in Korea and preliminary safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Kang Il; Kim, Jin Hyeong; Kwon, Mi Jin; Jeong, Mi Seon; Hong, Sung Wook; Park, Jin Beak [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of)

    2016-12-15

    The disposal facility in Gyeongju is planning to dispose of 800,000 packages of low- and intermediate- level radioactive waste. This facility will be developed as a complex disposal facility that has various types of disposal facilities and accompanying management. In this study, based on the comprehensive development plan of the disposal facility, a preliminary post-closure safety assessment is performed to predict the phase development of the total capacity for the 800,000 packages to be disposed of at the site. The results for each scenario meet the performance target of the disposal facility. The assessment revealed that there is a significant impact of the inventory of intermediate-level radionuclide waste on the safety evaluation. Due to this finding, we introduce a disposal limit value for intermediate-level radioactive waste. With stepwise development of safety case, this development plan will increase the safety of disposal facilities by reducing uncertainties within the future development of the underground silo disposal facilities.

  11. Birth Planning Values and Decisions: Preliminary Findings.

    Science.gov (United States)

    Townes, Brenda D.; And Others

    The values and processes which underlie people's birth planning decisions were studied via decision theory. Sixty-three married couples including 23 with no children, 33 with one child, and 27 with two children were presented with a large set of personal values related to birth planning decisions. Individuals rated the importance or utility of…

  12. Preliminary seismic hazard assessment, shallow seismic refraction and resistivity sounding studies for future urban planning at the Gebel Umm Baraqa area, Egypt

    International Nuclear Information System (INIS)

    Khalil, Mohamed H; Hanafy, Sherif M; Gamal, Mohamed A

    2008-01-01

    Gebel Umm Baraqa Fan, west Gulf of Aqaba, Sinai, is one of the most important tourism areas in Egypt. However, it is located on the active Dead Sea-Gulf of Aqaba Levant transform fault system. Geophysical studies, including fresh water aquifer delineation, shallow seismic refraction, soil characterization and preliminary seismic hazard assessment, were conducted to help in future city planning. A total of 11 vertical electrical soundings (1000–3000 m maximum AB/2) and three bore-holes were drilled in the site for the analysis of ground water, total dissolved solids (TDS) and fresh water aquifer properties. The interpretation of the one-dimensional (1D) inversion of the resistivity data delineated the fresh water aquifer and determined its hydro-geologic parameters. Eleven shallow seismic refraction profiles (125 m in length) have been collected and interpreted using the generalized reciprocal method, and the resulting depth–velocity models were verified using an advanced finite difference (FD) technique. Shallow seismic refraction effectively delineates two subsurface layers (VP ∼ 450 m s −1 and VP ∼ 1000 m s −1 ). A preliminary seismic hazard assessment in Umm Baraqa has produced an estimate of the probabilistic peak ground acceleration hazard in the study area. A recent and historical earthquake catalog for the time period 2200 BC to 2006 has been compiled for the area. New accurate seismic source zoning is considered because such details affect the degree of hazard in the city. The estimated amount of PGA reveals values ranging from 250 to 260 cm s −2 in the bedrock of the Umm Baraqa area during a 100 year interval (a suitable time window for buildings). Recommendations as to suitable types of buildings, considering the amount of shaking and the aquifer properties given in this study, are expected to be helpful for the Umm Baraqa area

  13. Stuttering on function words in bilingual children who stutter: A preliminary study.

    Science.gov (United States)

    Gkalitsiou, Zoi; Byrd, Courtney T; Bedore, Lisa M; Taliancich-Klinger, Casey L

    2017-01-01

    Evidence suggests young monolingual children who stutter (CWS) are more disfluent on function than content words, particularly when produced in the initial utterance position. The purpose of the present preliminary study was to investigate whether young bilingual CWS present with this same pattern. The narrative and conversational samples of four bilingual Spanish- and English-speaking CWS were analysed. All four bilingual participants produced significantly more stuttering on function words compared to content words, irrespective of their position in the utterance, in their Spanish narrative and conversational speech samples. Three of the four participants also demonstrated more stuttering on function compared to content words in their narrative speech samples in English, but only one participant produced more stuttering on function than content words in her English conversational sample. These preliminary findings are discussed relative to linguistic planning and language proficiency and their potential contribution to stuttered speech.

  14. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

  15. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan)

  16. Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

    International Nuclear Information System (INIS)

    Nelson, J.L.

    1987-09-01

    This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs

  17. Site study plan for ecology, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary Draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Ecology Site Study Plan describes a field program consisting of studies which include surveys for endangered, threatened, and candidate species; vegetation characterization, including mapping and cover typing, plant succession, wetlands description, and preexisting stresses; and wildlife community characterization, including availability and quality of habitats and descriptions of mammal, bird, reptile, amphibian, and invertebrate populations. The plan for each study describes the need for the study, study design, data management and use, schedule and personnel requirements, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document (SRP-RD). 83 refs., 3 tabs

  18. Light ion production for a future radiobiological facility at CERN: preliminary studies.

    Science.gov (United States)

    Stafford-Haworth, Joshua; Bellodi, Giulia; Küchler, Detlef; Lombardi, Alessandra; Röhrich, Jörg; Scrivens, Richard

    2014-02-01

    Recent medical applications of ions such as carbon and helium have proved extremely effective for the treatment of human patients. However, before now a comprehensive study of the effects of different light ions on organic targets has not been completed. There is a strong desire for a dedicated facility which can produce ions in the range of protons to neon in order to perform this study. This paper will present the proposal and preliminary investigations into the production of light ions, and the development of a radiobiological research facility at CERN. The aims of this project will be presented along with the modifications required to the existing linear accelerator (Linac3), and the foreseen facility, including the requirements for an ion source in terms of some of the specification parameters and the flexibility of operation for different ion types. Preliminary results from beam transport simulations will be presented, in addition to some planned tests required to produce some of the required light ions (lithium, boron) to be conducted in collaboration with the Helmholtz-Zentrum für Materialien und Energie, Berlin.

  19. Subseabed radionuclide migration studies and preliminary repository design concepts

    International Nuclear Information System (INIS)

    Brush, L.H.

    1982-01-01

    Geochemical research carried out by the US Subseabed Disposal Program is described. Data from studies of high-temperature interactions between sediments and pore water (seawater) and from studies of sorption and diffusion of radionuclides in oxidized, deep-sea sediments are used, along with results from heat transfer studies, to predict migration rates of raionuclides in a subseabed repository. Preliminary results for most radionuclides in oxidized sediments are very encouraging. Fission products with moderate K/sub D/ values (10 2 to 10 5 ml/g) and actinides with high K/sub D/ values (10 3 to 10 6 ml/g) would not migrate significant distances before decaying to innocuous concentrations. Among this group are 137 Cs, 90 Sr, and 239 Pu. The results for anionic species in oxidized sediments are less encouraging. Planning for field verification of these laboratory and modeling studies is currently under way. Conceptual repository designs and emplacement options are also described. 33 references, 15 figures, 1 table

  20. PRELIMINARY PROJECT PLAN FOR LANSCE INTEGRATED FLIGHT PATHS 11A, 11B, 12, and 13

    International Nuclear Information System (INIS)

    Bultman, D. H.; Weinacht, D.

    2000-01-01

    This Preliminary Project Plan Summarizes the Technical, Cost, and Schedule baselines for an integrated approach to developing several flight paths at the Manual Lujan Jr. Neutron Scattering Center at the Los Alamos Neutron Science Center. For example, the cost estimate is intended to serve only as a rough order of magnitude assessment of the cost that might be incurred as the flight paths are developed. Further refinement of the requirements and interfaces for each beamline will permit additional refinement and confidence in the accuracy of all three baselines (Technical, Cost, Schedule)

  1. Site Study Plan for soils, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Soils Site Study Plan describes a field program consisting of a soil characterization survey, impact monitoring of soils, predisturbance soil salinity survey, and a reclamation suitability study. This information will be used to plan for soil stripping, stockpiling, and replacement; reclamation of soils; determining predisturbance chemical and physical characteristics of the soils; including salinity levels; and monitoring for changes in chemical and physical characteristics of the soil. The SSP describes for each study the need for the study, the study design, data management and use, schedule of proposed activities, and the quality assurance program. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document. 75 refs., 10 figs., 5 tabs

  2. Site Study Plan for Aesthetics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Aesthetic Site Study Plan describes a field program consisting of identification of the visually affected area; determination of scenic quality, visual sensitivity, and visual management classes of the site and vicinity; and analysis of the level of visual contrast that would be created by the project. Field ratings of scenic quality, visual sensitivity, and visual contrast will be supplemented by a public perception survey designed to incorporate the views of the public. This plan describes the need for the study, the study design, data management and use, schedule for proposed activities, and quality assurance program. This study will provide data needed to satisfy requirements contained in, or derived from, SRPO Requirement Document (SRP-RD). 35 refs., 6 figs., 2 tabs

  3. 24 CFR 599.507 - Tax incentives utilization plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Tax incentives utilization plan....507 Tax incentives utilization plan. (a) Preliminary plan. Within six months of designation, the CoRA must prepare and submit to HUD a preliminary tax incentives utilization plan for achieving the State...

  4. Preliminary study on enhancing waste management best practice model in Malaysia construction industry

    Science.gov (United States)

    Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul

    2017-08-01

    Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.

  5. TMI-2 containment decontamination plans

    International Nuclear Information System (INIS)

    McDougall, F.

    1980-01-01

    Because of other priorities such as reentry, purging, and recovery, containment decontamination is only in the preliminary planning stages. This paper summarizes the study with emphasis on the remote decontamination techniques

  6. 32 CFR 644.30 - Preliminary real estate work.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Preliminary real estate work. 644.30 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Military (army and Air Force) and Other Federal Agencies § 644.30 Preliminary real estate work. (a) Preliminary real estate work is defined as that action taken...

  7. A preliminary study on radiation damage effect in ceramics composite materials as innovative basic research using the HTTR

    International Nuclear Information System (INIS)

    Ishihara, Masahiro; Baba, Shinichi; Aihara, Jun; Arai, T.; Hayashi, K.; Ishino, S.

    1999-01-01

    An innovative basic research concerning with the basic science and applied technology is planned using the High Temperature Engineering Test Reactor (HTTR), which provides the advantage of not only a high temperature irradiation field above 400degC but also a large irradiation space. The first irradiation experiment is to be performed in 2001. Many research themes with a wide variety of scientific and technological interests are proposed as the innovative basic research. For the purpose of demonstration of scientific feasibility and advantages in the HTTR irradiation, several research themes have been being conducted as the preliminary studies. In this paper the outline of the innovative basic research is described, and the preliminary study on the radiation damage mechanism of ceramic composite materials is presented. (author)

  8. Plutonium Immobilization Can Loading Preliminary Specifications

    Energy Technology Data Exchange (ETDEWEB)

    Kriikku, E.

    1998-11-25

    This report discusses the Plutonium Immobilization can loading preliminary equipment specifications and includes a process block diagram, process description, equipment list, preliminary equipment specifications, plan and elevation sketches, and some commercial catalogs. This report identifies loading pucks into cans and backfilling cans with helium as the top priority can loading development areas.

  9. The MSFC Collaborative Engineering Process for Preliminary Design and Concept Definition Studies

    Science.gov (United States)

    Mulqueen, Jack; Jones, David; Hopkins, Randy

    2011-01-01

    This paper describes a collaborative engineering process developed by the Marshall Space Flight Center's Advanced Concepts Office for performing rapid preliminary design and mission concept definition studies for potential future NASA missions. The process has been developed and demonstrated for a broad range of mission studies including human space exploration missions, space transportation system studies and in-space science missions. The paper will describe the design team structure and specialized analytical tools that have been developed to enable a unique rapid design process. The collaborative engineering process consists of integrated analysis approach for mission definition, vehicle definition and system engineering. The relevance of the collaborative process elements to the standard NASA NPR 7120.1 system engineering process will be demonstrated. The study definition process flow for each study discipline will be will be outlined beginning with the study planning process, followed by definition of ground rules and assumptions, definition of study trades, mission analysis and subsystem analyses leading to a standardized set of mission concept study products. The flexibility of the collaborative engineering design process to accommodate a wide range of study objectives from technology definition and requirements definition to preliminary design studies will be addressed. The paper will also describe the applicability of the collaborative engineering process to include an integrated systems analysis approach for evaluating the functional requirements of evolving system technologies and capabilities needed to meet the needs of future NASA programs.

  10. Adult health study. Hiroshima preliminary report, 1958-1959

    Energy Technology Data Exchange (ETDEWEB)

    Hollingsworth, J W; Anderson, Jr, P S

    1961-06-28

    The first 4151 clinical examinations of radiation exposed and nonexposed persons in the Hiroshima Adult Health Study have been tabulated and reviewed. No evident differences in past history, medical symptoms, physical examination, laboratory findings, nor disease incidence could be related to the atomic radiation in 1945. The sample is small and represents only a portion of the first cycle of an examination procedure that is planned to continue indefinitely at approximately two year intervals. This report, consisting of a review of the program and the findings in this preliminary sample, includes extensive tabular data (Tables 28-65) from the coded medical information. It was not expected that radiation induced changes would be evident from this sample unless they were of unexpected prominence. The report was prepared primarily to describe the problems inherent in an epidemiologic medical study of this sort, and to review the type of data that can be obtained for future analyses. This analysis was conducted to pinpoint some of the problems; to assist others contemplating this type of medical study; to illuminate for ABCC the data that are being collected; and to suggest ways to use these data most effectively. 16 references, 1 figure, 65 tables.

  11. R and D Requirements, RF Gun Mode Studies, FEL-2 Steady-State Studies, Preliminary FEL-1 Time-Dependent Studies, and Preliminary Layout Option Investigation

    International Nuclear Information System (INIS)

    Byrd, John; Corlett, John; Doolittle, Larry; Fawley, William; Lidia, Steven; Penn, Gregory; Ratti, Alex; Staples, John; Wilcox Russell; Wurtele, Jonathan; Zholents, Alexander

    2005-01-01

    This report constitutes the third deliverable of LBNLs contracted role in the FERMI (at) Elettra Technical Optimization study. It describes proposed RandD activities for the baseline design of the Technical Optimization Study, initial studies of the RF gun mode-coupling and potential effects on beam dynamics, steady-state studies of FEL-2 performance to 10 nm, preliminary studies of time-dependent FEL-1 performance using electron bunch distribution from the start-to-end studies, and a preliminary investigation of a configuration with FEL sinclined at a small angle from the line of the linac

  12. Site Study Plan for background environmental radioactivity, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Background Environmental Radioactivity Site Study Plan describes a field program consisting of an initial radiological survey and a radiological sampling program. The field program includes measurement of direct radiation and collection and analysis of background radioactivity samples of air, precipitation, soil, water, milk, pasture grass, food crops, meat, poultry, game, and eggs. The plan describes for each study: the need for the study, the study design, data management and use, schedule of proposed activities, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project (SRP) Requirements Document. 50 refs., 11 figs., 7 tabs

  13. Preliminary design studies on the Broad Application Test Reactor

    International Nuclear Information System (INIS)

    Terry, W.J.; Terry, W.K.; Ryskamp, J.M.; Jahshan, S.N.; Fletcher, C.D.; Moore, R.L.; Leyse, C.F.; Ottewitte, E.H.; Motloch, C.G.; Lacy, J.M.

    1992-08-01

    This report describes progress made at the Idaho National Engineering Laboratory during the first three quarters of Fiscal Year (FY) 1992 on the Laboratory-Directed Research and Development (LDRD) project to perform preliminary design studies on the Broad Application Test Reactor (BATR). This work builds on the FY-92 BATR studies, which identified anticipated mission and safety requirements for BATR and assessed a variety of reactor concepts for their potential capability to meet those requirements. The main accomplishment of the FY-92 BATR program is the development of baseline reactor configurations for the two conventional conceptual test reactors recommended in the FY-91 report. Much of the present report consists of descriptions and neutronics and thermohydraulics analyses of these baseline configurations. In addition, we considered reactor safety issues, compared the consequences of steam explosions for alternative conventional fuel types, explored a Molten Chloride Fast Reactor concept as an alternate BATR design, and examined strategies for the reduction of operating costs. Work planned for the last quarter of FY-92 is discussed, and recommendations for future work are also presented

  14. Visual Assessment on Coastal Cruise Tourism: A Preliminary Planning Using Importance Performance Analysis

    Science.gov (United States)

    Trisutomo, S.

    2017-07-01

    Importance-Performance Analysis (IPA) has been widely applied in many cases. In this research, IPA was applied to measure perceive on coastal tourism objects and its possibility to be developed as coastal cruise tourism in Makassar. Three objects, i.e. Akkarena recreational site, Losari public space at waterfront, and Paotere traditional Phinisi ships port, were selected and assessed visually from water area by a group of purposive resource persons. The importance and performance of 10 attributes of each site were scored using Likert scale from 1 to 5. Data were processed by SPSS-21 than resulted Cartesian graph which the scores were divided in four quadrants: Quadrant I concentric here, Quadrant II keep up the good work, Quadrant III low priority, and Quadrant IV possible overkill. The attributes in each quadrant could be considered as the platform for preliminary planning of coastal cruise tour in Makassar

  15. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    Science.gov (United States)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  16. Site Study Plan for land use, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Land Use Site Study Plan describes a field program consisting of characterization of the site; seismic survey rights-of-way and transportation and utility corridors, the vicinity, the region, future land use, and monitoring land-use change. Aerial photography will be used to characterize the site, seismic rows and transportation and utility corridors, and the vicinity. The resulting land-use maps and overlays will then be verified in the field. Interviews with farm managers and local experts will provide additional information. A Geographic Information System (GIS) and satellite imagery will be used to characterize the region, monitor land-use change, and provide information to assist with the future land use study. The site study plan describes the study design and rationale, the filed data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the personnel requirements and management of the study, and the study's quality assurance program. The directives and requirements that drive these studies are derived from the Salt Repository Project Requirements Document. 51 refs; 6 figs; 3 tabs

  17. Cell emulation and preliminary results.

    Science.gov (United States)

    2016-07-01

    This report details preliminary results of the testing plan implemented by the Hawaii Natural Energy Institute to evaluate Electric Vehicle (EV) battery durability and reliability under electric utility grid operations. Commercial EV battery cells ar...

  18. Preliminary analysis of patent trends for magnetic fusion technology

    International Nuclear Information System (INIS)

    Levine, L.O.; Ashton, W.B.; Campbell, R.S.

    1984-02-01

    This study presents a preliminary analysis of development trends in magnetic fusion technology based on data from US patents. The research is limited to identification and description of general patent activity and ownership characteristics for 373 patents. The results suggest that more detailed studies of fusion patents could provide useful R and D planning information

  19. Preliminary safety evaluation, based on initial site investigation data. Planning document

    International Nuclear Information System (INIS)

    Hedin, Allan

    2002-12-01

    This report is a planning document for the preliminary safety evaluations (PSE) to be carried out at the end of the initial stage of SKBs ongoing site investigations for a deep repository for spent nuclear fuel. The main purposes of the evaluations are to determine whether earlier judgements of the suitability of the candidate area for a deep repository with respect to long-term safety holds up in the light of borehole data and to provide feed-back to continued site investigations and site specific repository design. The preliminary safety evaluations will be carried out by a safety assessment group, based on a site model, being part of a site description, provided by a site modelling group and a repository layout within that model suggested by a repository engineering group. The site model contains the geometric features of the site as well as properties of the host rock. Several alternative interpretations of the site data will likely be suggested. Also the biosphere is included in the site model. A first task for the PSE will be to compare the rock properties described in the site model to previously established criteria for a suitable host rock. This report gives an example of such a comparison. In order to provide more detailed feedback, a number of thermal, hydrological, mechanical and chemical analyses of the site will also be included in the evaluation. The selection of analyses is derived from the set of geosphere and biosphere analyses preliminarily planned for the comprehensive safety assessment named SR-SITE, which will be based on a complete site investigation. The selection is dictated primarily by the expected feedback to continued site investigations and by the availability of data after the PSE. The repository engineering group will consider several safety related factors in suggesting a repository layout: Thermal calculations will be made to determine a minimum distance between canisters avoiding canister surface temperatures above 100 deg C

  20. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results; Impact des changements climatiques sur les plans de gestion des reservoirs Saint-Francois et Aylmer : resultats preliminaires

    Energy Technology Data Exchange (ETDEWEB)

    Turcotte, R; Fortin, L G; Pugin, S; Cyr, J F; Picard, F; Poirier, C; Lacombe, P [Centre d' Expertise Hydrique du Quebec, Quebec, PQ (Canada). Service de la Securite des Barrages; Chaumont, D; Desrochers, G; Vescovi, L; Roy, R [Ouranos, Montreal, PQ (Canada)

    2004-09-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs.

  1. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results; Impact des changements climatiques sur les plans de gestion des reservoirs Saint-Francois et Aylmer : resultats preliminaires

    Energy Technology Data Exchange (ETDEWEB)

    Turcotte, R.; Fortin, L.G.; Pugin, S.; Cyr, J.F.; Picard, F.; Poirier, C.; Lacombe, P. [Centre d' Expertise Hydrique du Quebec, Quebec, PQ (Canada). Service de la Securite des Barrages; Chaumont, D.; Desrochers, G.; Vescovi, L.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2004-09-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs.

  2. PRELIMINARY STUDY TO PRIMARY EDUCATION FACILITIES (A Comparison Study between Indonesia and Developed Countries

    Directory of Open Access Journals (Sweden)

    Lucy Yosita

    2006-01-01

    Full Text Available This writing is a preliminary study to condition of primary education facilities in Indonesia, and then comparing these with theories as well as various relevant cases aimed to know the problem more obviously. Basically, there is difference between primary education facilities in Indonesia with those in developed countries. Meanwhile on the other hand, the condition as well as the completion of education facility is actually as the main factor contributes to address the purpose of learning process. If building design, interior and also site plan were dynamic in form, space, colour and tools, those would be probably more stimulate activity and influence into the growth of students. However, lastly, it is still required further analysis, as an example analysis to student's behaviour in spaces of learning environment, more detail and within enough time, not only at indoor but also at outdoor.

  3. Joint U.S./Russian Study on the Development of a Preliminary Cost Estimate of the SAFSTOR Decommissioning Alternative for the Leningrad Nuclear Power Plant Unit #1

    Energy Technology Data Exchange (ETDEWEB)

    SM Garrett

    1998-09-28

    The objectives of the two joint Russian/U.S. Leningrad Nuclear Power Plant (NPP) Unit #1 studies were the development of a safe, technically feasible, economically acceptable decom missioning strategy, and the preliminary cost evaluation of the developed strategy. The first study, resulting in the decommissioning strategy, was performed in 1996 and 1997. The preliminary cost estimation study, described in this report, was performed in 1997 and 1998. The decommissioning strategy study included the analyses of three basic RBM.K decommission- ing alternatives, refined for the Leningrad NPP Unit #1. The analyses included analysis of the requirements for the planning and preparation as well as the decommissioning phases.

  4. ERG and GRG review of the draft of ''preliminary test plan for in situ testing from an exploratory shaft in salt - October 1983''

    International Nuclear Information System (INIS)

    Kalia, H.N.

    1986-03-01

    The Engineering Review Group (ERG) and Geologic Review Group (GRG) were established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate engineering- and geologic-related issues in the US Department of Energy's nuclear waste repository program. The January 1984 meeting of the ERG and GRG reviewed the In Situ Test Plan (ISTP) titled ''Preliminary Test Plan for In Situ Testing From an Exploratory Shaft in Salt - October 1983.'' This report documents the ERG's and GRG's comments and recommendations on this subject and the ONWI responses to the specific points raised by the ERG and GRG. 6 refs., 2 figs., 1 tab

  5. Energy Efficient Engine: Control system preliminary definition report

    Science.gov (United States)

    Howe, David C.

    1986-01-01

    The object of the Control Preliminary Definition Program was to define a preliminary control system concept as a part of the Energy Efficient Engine program. The program was limited to a conceptual definition of a full authority digital electronic control system. System requirements were determined and a control system was conceptually defined to these requirements. Areas requiring technological development were identified and a plan was established for implementing the identified technological features, including a control technology demonstration. A significant element of this program was a study of the potential benefits of closed-loop active clearance control, along with laboratory tests of candidate clearance sensor elements for a closed loop system.

  6. Preliminary study of mercury target structure

    Energy Technology Data Exchange (ETDEWEB)

    Kaminaga, Masanori; Haga, Katsuhiro; Hino, Ryutaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Kumasaka, Katsuyuki; Uchida, Shoji; Nakagawa, Toshi; Mori, Seiji; Nishikawa, Akira

    1997-11-01

    Development of a proton accelerator based neutron source (1.5 GeV, 5.3 mA (for neutron source 3.3 mA), thermal power 8 MW) is currently conducted by the Special Task Force for Neutron Science Initiative, JAERI. Preliminary design studies and related R and D of a solid metal target for the first stage (1.5 GeV, 1 mA) and a liquid metal target for both the first and second stages (1.5 GeV, 3.3 mA) are conducted by the Target Group to develop both solid and liquid metal target systems. A few kinds of target structures have been investigated in FY 1996 and the preliminary results for the target structures are described in this paper. Investigation results of alternative materials for the target container are also described in this paper. (author)

  7. Variable Cycle Engine Technology Program Planning and Definition Study

    Science.gov (United States)

    Westmoreland, J. S.; Stern, A. M.

    1978-01-01

    The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.

  8. Strategic planning model for Startups: A case study of Iranian packaging industry

    Directory of Open Access Journals (Sweden)

    Mohammad Mahdavi Mazdeh

    2011-04-01

    Full Text Available In today’s turbulent and competitive world, strategic planning plays an important role for the success of firms. Despite the fact that there are literally numerous models proposed for different companies in various states and structures, the possibility of using strategic planning for startups has never been seriously considered. In this paper, we present a survey by asking experts to find out whether strategic planning is suitable for startups. We also propose a model for strategic planning in startups based on the strategic planning models for small businesses and entrepreneurship concepts. The model is similar to other models and what differentiates this models form other approaches is the methodology used for internal and external analysis and the parameters taken into consideration. The proposed model is examined on an Iranian food packaging industry for validation. The preliminary results indicate that the success of startups depends on two sets of parameters: “entrepreneurial opportunities” and “competitive advantages and entrepreneurial characteristics”.

  9. Preliminary studies in rice-fish culture in a rainfed lowland ecology ...

    African Journals Online (AJOL)

    Preliminary studies in rice-fish culture in a rainfed lowland ecology in Ghana. PKA Dartey, RK Bam, J Ofori. Abstract. Mixed farms of rice and fish are yet to receive attention in Ghana, despite lowland rice being grown under inundation in most areas nationwide. In a preliminary study, Nile tilapia (Oreochromis niloticus) was ...

  10. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  11. Columbia River impact evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    As a result of past practices, four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. To accomplish the timely cleanup of the past-practice units, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), was signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE). To support the Tri-Party Agreement, milestones were adopted. These milestones represent the actions needed to ensure acceptable progress toward Hanford Site compliance with CERCLA, RCRA, and the Washington State Hazardous Waste Management Act of 1976. This report was prepared to fulfill the requirement of Tri-Party Agreement Milestone M-30-02, which requires a plan to determine cumulative health and environmental impacts to the Columbia River. This plan supplements the CERCLA remedial investigations/feasibility studies (RI/FS) and RCRA facility investigations/corrective measures studies (RFI/CMSs) that will be undertaken in the 100 Area. To support the plan development process, existing information was reviewed and a preliminary impact evaluation based on this information was performed. The purpose of the preliminary impact evaluation was to assess the adequacy of existing data and proposed data collection activities. Based on the results of the evaluation, a plan is proposed to collect additional data or make changes to existing or proposed data collection activities.

  12. Plan's CCCD approach - Country study PLAN-Bangladesh

    NARCIS (Netherlands)

    Uffelen, van G.J.

    2009-01-01

    PLAN Netherlands National Organisation has in coordination with PLAN International Headquarters commissioned an independent formative evaluation study to get systematic insight in the preconditions for appropriate functionality of Child Centred Community Development (CCCD) and to strengthen common

  13. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  14. Proper project planning helps minimize overruns and delays

    International Nuclear Information System (INIS)

    Donnelly, G.; Cooney, D.J.

    1994-01-01

    This paper describes planning methods to help minimize cost overruns during the construction of oil and gas pipelines. These steps include background data collection methods, field surveys, determining preliminary pipeline routes, regulatory agency pre-application meetings, and preliminary engineering. Methods for planning also include preliminary aerial mapping, biological assessments, cultural resources investigations, wetlands delineation, geotechnical investigations, and environmental audits. Identification of potential problems can allow for rerouting of the pipeline or remediation processes before they are raised during the permitting process. By coordinating these events from the very beginning, significant cost savings will result that prevent having to rebudget for them after the permitting process starts

  15. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  16. PROMISE: A preliminary study of a scientific information system for MIPAS satellite experiment

    International Nuclear Information System (INIS)

    Kapetanios, E.

    1993-08-01

    A scientific information system for MIPAS satellite experiment will be presented according to its main hardware and software configuration. It will be considered as a MIPAS data processing and archiving node of the ground segment of the planned satellite mission for the remote sensing of atmospheric parameters, as well as an information system supporting the researchers in their scientific environment. In this preliminary study, the methodology of a more detailed system design has also been specified. The system consists of two logical components, an operational database for the generation, storage and management of vast amounts of MIPAS data received from the satellite, and the research and development database, which must be interfaced to the operational one, providing a more abstract and user-friendly interface for the scientific community enabling experimentation and the extraction of the information needed. (orig.) [de

  17. Preliminary simulation study of doppler reflectometry

    International Nuclear Information System (INIS)

    Ishii, Yuta; Hojo, Hitoshi; Yoshikawa, Masashi; Ichimura, Makoto; Haraguchi, Yusuke; Imai, Tsuyoshi; Mase, Atsushi

    2010-01-01

    A preliminary simulation study of Doppler reflectometry is performed. The simulations solve Maxwell's equations by a finite difference time domain (FDTD) code method in two dimensions. A moving corrugated metal target is used as a plasma cutoff layer to study the basic features of Doppler reflectometry. We examined the effects of the full width at half maximum (FWHM) of the electromagnetic waves and the corrugation depth of the metal target. Furthermore, the effect of a nonuniform plasma is studied using this FDTD analysis. The Doppler shift and velocity are compared with those obtained from FDTD analysis of a uniform plasma. (author)

  18. Preliminary closed Brayton cycle study for a space reactor application

    International Nuclear Information System (INIS)

    Guimaraes, Lamartine Nogueira Frutuoso; Carvalho, Ricardo Pinto de; Camillo, Giannino Ponchio

    2007-01-01

    The Nuclear Energy Division (ENU) of the Institute for Advanced Studies (IEAv) has started a preliminary design study for a Closed Brayton Cycle Loop (CBCL) aimed at a space reactor application. The main objectives of the study are to establish a starting concept for the CBCL components specifications, and to develop a demonstrative simulator of CBCL in nominal operation conditions. The ENU/IEAv preliminary design study is developing the CBCL around the NOELLE 60290 turbo machine. The actual nuclear reactor study is being conducted independently. Because of that, a conventional heat source is being used for the CBCL, in this preliminary design phase. This paper describes the steady state simulator of the CBCL operating with NOELLE 60290 turbo machine. In principle, several gases are being considered as working fluid, as for instance: air, helium, nitrogen, CO2 and gas mixtures such as helium and xenon. At this moment the simulator is running with Helium as the working fluid. Simplified models of heat and mass transfer are being developed to simulate thermal components. Future efforts will focus on keeping track of the modifications being implemented at the NOELLE 60290 turbo machine in order to build the CBCL. (author)

  19. Preliminary closed Brayton cycle study for a space reactor application

    Energy Technology Data Exchange (ETDEWEB)

    Guimaraes, Lamartine Nogueira Frutuoso; Carvalho, Ricardo Pinto de [Institute for Advanced Studies, Sao Jose dos Campos, SP (Brazil)]. E-mail: guimarae@ieav.cta.br; Camillo, Giannino Ponchio [Instituto Tecnologico de Aeronautica (ITA), Sao Jose dos Campos, SP (Brazil)]. E-mail: gianninocamillo@gmail.com

    2007-07-01

    The Nuclear Energy Division (ENU) of the Institute for Advanced Studies (IEAv) has started a preliminary design study for a Closed Brayton Cycle Loop (CBCL) aimed at a space reactor application. The main objectives of the study are to establish a starting concept for the CBCL components specifications, and to develop a demonstrative simulator of CBCL in nominal operation conditions. The ENU/IEAv preliminary design study is developing the CBCL around the NOELLE 60290 turbo machine. The actual nuclear reactor study is being conducted independently. Because of that, a conventional heat source is being used for the CBCL, in this preliminary design phase. This paper describes the steady state simulator of the CBCL operating with NOELLE 60290 turbo machine. In principle, several gases are being considered as working fluid, as for instance: air, helium, nitrogen, CO2 and gas mixtures such as helium and xenon. At this moment the simulator is running with Helium as the working fluid. Simplified models of heat and mass transfer are being developed to simulate thermal components. Future efforts will focus on keeping track of the modifications being implemented at the NOELLE 60290 turbo machine in order to build the CBCL. (author)

  20. Implications of the timing of the preliminary determination of suitability

    International Nuclear Information System (INIS)

    Cotton, T.A.

    1986-01-01

    The Nuclear Waste Policy Act of 1982 requires that the Enviromental Impact Statement prepared for the recommendation of a repository site must consider three sites -- the one selected for the repository and at least two alternatives. All of these sites must have been characterized, and the Secretary of Energy must have made a preliminary determination that each is suitable for development as a repository. There is great disagreement about whether that ''preliminary determination of suitability'' is to be made before or after site characterization. If the Act is interpreted as requiring the determination to be made after characterization is completed, DOE cannot recommend the first site for licensing until it has three sites that appear suitable after full characterization; if the determination can be made before characterization, DOE can proceed to licensing even if only one site survives characterization. While DOE plans to make the preliminary determination before starting characterization, the uncertainty about how a court might ultimately interpret the Act injects a significant institutional uncertainty into the schedule for the repository, and complicates contingency planning for the siting process. Early resolution of the interpretation would greatly aid DOE's planning for the siting program

  1. Hanford ferrocyanide waste chemistry and reactivity preliminary catalyst and initiator screening studies

    International Nuclear Information System (INIS)

    Scheele, R.D.; Bryan, S.A.; Johnston, J.W.; Tingey, J.M.; Burger, L.L.; Hallen, R.T.

    1992-05-01

    During the 1950s, ferrocyanide was used to scavenge radiocesium from aqueous nitrate-containing Hanford wastes. During the production of defense materials and while these wastes were stored in high-level waste tanks at the Hanford Site, some of these wastes were likely mixed with other waste constituents and materials. Recently, Pacific Northwest Laboratory (PNL) was commissioned by Westinghouse Hanford Company (WHC) to investigate the chemical reactivity of these ferrocyanide-bearing wastes. Because of known or potential thermal reactivity hazards associated with ferrocyanide- and nitrate-bearing wastes, and because of the potential for different materials to act as catalysts or initiators of the reactions about which there is concern, we at PNL have begun investigating the effects of the other potential waste constituents. This report presents the results of a preliminary screening study to identify classes of materials that might be in the Hanford high-level waste tanks and that could accelerate or reduce the starting temperature of the reaction(s) of concern. We plan to use the resulted of this study to determine which materials or class of materials merit additional research

  2. Adult Health Study: provisional research plan

    Energy Technology Data Exchange (ETDEWEB)

    Hollingsworth, J W; Beebe, G W

    1960-12-14

    The study is planned as an intensive search for the late effects of single, whole-body radiation from the Hiroshima and Nagasaki bombs. Although dosimetry information is by no means definitive at this time, preliminary information suggests that the effects of radiation doses up to 600 rads can be effectively studied in the surviving samples. The lower limit is moot, depending on the magnitude of the effect produced and the sensitivity of the study. The upper limit is also somewhat uncertain, as the most closely exposed individuals were more often heavily shielded. The potential radiation effects may be classified as follows: (1) alterations in the incidence of disease; (2) alterations in the natural history of disease, with or without alteration in incidence; (3) development of physiological or biochemical changes, or markers, short of actual disease; (4) nonspecific changes in vigor, acceleration of aging; and (5) occurrence of new diseases. It is proposed to conduct a search sufficiently intensive to detect effects of all five types. It is also a specific objective of this investigation to illuminate the pathogenesis of diseases of increased incidence, or of new diseases, if such be found. Also of interest is the matter of genetic or biochemical factors associated with survival and with the appearance of acute radiation symptoms. Survivors represent a truncated sample and selective host factors may have played a part in both survival and the liklihood of acute radiation symptoms. 17 reference.

  3. Preliminary results with the CLAMSUD pion spectrometer at the Moscow Meson Factory

    International Nuclear Information System (INIS)

    Badala, A.; Barbera, R.; Librizzi, F.; Longhitano, A.; Nicotra, D.; Palmeri, A.; Pappalardo, G.S.; Riggi, F.; Santoro, A.; Turrisi, R.; Aseev, V.; Feschenko, A.; Gavrilov, Yu.; Guber, F.; Golubeva, M.; Karavicheva, T.; Kurepin, A.; Ostroumov, P.; Potapov, V.; Tiflov, V.; Zhuravlev, A.

    1995-01-01

    A magnetic spectrometer has been recently installed at the new proton beam facility of the Moscow Meson Factory, to study charged pion production from proton-nucleus interactions at 200-400 MeV bombarding energy. Preliminary reults obtained during the first runs are reported. The planned physics program is also discussed. (orig.)

  4. Preliminary design study of a steady state tokamak device

    International Nuclear Information System (INIS)

    Miya, Naoyuki; Nakajima, Shinji; Ushigusa, Kenkichi; and athors)

    1992-09-01

    Preliminary design study has been made for a steady tokamak with the plasma current of 10MA, as the next to the JT-60U experimental programs. The goal of the research program is the integrated study of steady state, high-power physics and technology. Present candidate design is to use superconducting TF and PF magnet systems and long pulse operation of 100's-1000's of sec with non inductive current drive mainly by 500keV negative ion beam injection of 60MW. Low activation material such as titanium alloy is chosen for the water tank type vacuum vessel, which is also the nuclear shield for the superconducting coils. The present preliminary design study shows that the device can meet the existing JT-60U facility capability. (author)

  5. Pre-Operative Planning Using Real-Time Virtual Sonography, an MRI/Ultrasound Image Fusion Technique, for Breast-Conserving Surgery in Patients with Non-Mass Enhancement on Breast MRI: A Preliminary Study.

    Science.gov (United States)

    Ando, Takahito; Ito, Yukie; Ido, Mirai; Osawa, Manami; Kousaka, Junko; Mouri, Yukako; Fujii, Kimihito; Nakano, Shogo; Kimura, Junko; Ishiguchi, Tsuneo; Watanebe, Rie; Imai, Tsuneo; Fukutomi, Takashi

    2018-07-01

    The purpose of this retrospective study was to evaluate the effect of pre-operative planning using real-time virtual sonography (RVS), a magnetic resonance imaging (MRI)/ultrasound (US) image fusion technique on breast-conserving surgery (BCS) in patients with non-mass enhancement (NME) on breast MRI. Between 2011 and 2015, we enrolled 12 consecutive patients who had lesions with NME that exceeded the US hypo-echoic area, in which it was particularly difficult to evaluate the tumor margin. During pre-operative planning before breast-conserving surgery, RVS was used to delineate the enhancing area on the breast surface after additional supine breast MRI was performed. We analyzed both the surgical margin positivity rate and the re-operation rate. All NME lesions corresponded to the index cancer. In all patients, the diameter of the NME lesion was greater than that of the hypo-echoic lesion. The median diameters of the NME and hypo-echoic lesions were 24 mm (range: 12-39 mm) and 8.0 mm (range: 4.9-18 mm), respectively (p = 0.0002). After RVS-derived skin marking was performed on the surface of the affected breast, lumpectomy and quadrantectomy were conducted in 7 and 5 patients, respectively. The surgical margins were negative in 10 (83%) patients. Two patients with positive margins were found to have ductal carcinoma in situ in 1 duct each, 2.4 and 3.2 mm from the resection margin, respectively. None of the patients required additional resection. Although further prospective studies are required, the findings of our preliminary study suggest that it is very well possible that the use of RVS-derived skin marking during pre-operative planning for BCS in patients with NME would have resulted in surgical outcomes similar to or better than those obtained without the use of such marking. Copyright © 2018. Published by Elsevier Inc.

  6. Site study plan for utilities and solid waste, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site plan describes utilities and solid waste studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. After utilities and solid waste information needs derived from Federal, State, and local statutes and regulations and the project specifications are briefly described, the site study plan describes the study design and rationale, the field data collection procedures and equipment, and data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs to characterize electrical power, natural gas, communication, water, wastewater sludge, nonradiological solid waste, nonradiological hazardous waste, and low-level radiological waste. These programs include details for the collection of project needs, identification of utilities and solid waste disposal contractor capabilities, and verification of the obtained data. Utilities and solid waste field activities will begin approximately at the time of site access. Utilities and solid waste characterization will be completed within the first year of activity. 29 refs., 6 figs., 2 tabs

  7. Contextual factors influencing strategic information systems planning in a network: Evaluation of two inter-municipality projects in Finland

    NARCIS (Netherlands)

    Van Den Broek, T.; Spil, T.; Kestilä, T.; Ehrenhard, M.; Salmela, H.

    2008-01-01

    Strategic Information Systems Planning (SISP) is mostly studied within organizations. Recently, preliminary attempts are made to study SISP on network level. As network studies up to now focus on the planning process and its outcome, we choose to study contextual factors that give input to the

  8. Preliminary 2D design study for A ampersand PCT

    International Nuclear Information System (INIS)

    Keto, E.; Azevedo, S.; Roberson, P.

    1995-03-01

    Lawrence Livermore National Laboratory is currently designing and constructing a tomographic scanner to obtain the most accurate possible assays of radioactivity in barrels of nuclear waste in a limited amount of time. This study demonstrates a method to explore different designs using laboratory experiments and numerical simulations. In particular, we examine the trade-off between spatial resolution and signal-to-noise. The simulations are conducted in two dimensions as a preliminary study for three dimensional imaging. We find that the optimal design is entirely dependent on the expected source sizes and activities. For nuclear waste barrels, preliminary results indicate that collimators with widths of 1 to 3 inch and aspect ratios of 5:1 to 10:1 should perform well. This type of study will be repeated in 3D in more detail to optimize the final design

  9. Preliminary Feasibility Study of the Solar Observation Payloads for STSAT-CLASS Satellites

    Directory of Open Access Journals (Sweden)

    Yong-Jae Moon

    2004-12-01

    Full Text Available In this paper, we present preliminary feasibility studies on three types of solar observation payloads for future Korean Science and Technology Satellite (STSAT programs. The three candidates are (1 an UV imaging telescope, (2 an UV spectrograph, and (3 an X-ray spectrometer. In the case of UV imaging telescope, the most important constraint seems to be the control stability of a satellite in order to obtain a reasonably good spatial resolution. Considering that the current pointing stability estimated from the data of the Far ultraviolet Imaging Spectrograph (FIMS onboard the Korean STSAT-1, is around 1 arc minutes/sec, we think that it is hard to obtain a spatial resolution sufficient for scientific research by such an UV Imaging Telescope. For solar imaging missions, we realize that an image stabilization system, which is composed of a small guide telescope with limb sensor and a servo controller of secondary mirror, is quite essential for a very good pointing stability of about 0.1 arcsec. An UV spectrograph covering the solar full disk seems to be a good choice in that there is no risk due to poor pointing stability as well as that it can provide us with valuable UV spectral irradiance data valuable for studying their effects on the Earth's atmosphere and satellites. The heritage of the FIMS can be a great advantage of developing the UV spectrograph. Its main disadvantage is that two major missions are in operation or scheduled. Our preliminary investigations show that an X-ray spectrometer for the full disk Sun seems to be the best choice among the three candidates. The reasons are : (1 high temporal and spectral X-ray data are very essential for studying the acceleration process of energetic particles associated with solar flares, (2 we have a good heritage of X-ray detectors including a rocket-borne X-ray detector, (3 in the case of developing countries such as India and Czech, solar X-ray spectrometers were selected as their early stage

  10. Landscape planning and management of spas in Serbia with special reference to the selected case studies

    Directory of Open Access Journals (Sweden)

    Crnčević Tijana

    2010-01-01

    Full Text Available In the paper is presented the overview of the legal requirements in Serbia covering planning and as well landscape planning. It is stress that Serbia is in the process of the ratification of the European Landscape Convention (ELC and adoption of the Spatial Plan of the Republic of Serbia (SPRS where is included the obligation of the production of the study 'Characterization of the landscape in Serbia' and as well pilot projects 'Characterization of the landscape' where are separated priority areas and where are specially stressed as tourist destinations spas. Taking into consideration that important step towards development of the methodological framework for landscape planning and management in Serbia was made with the inclusion of this subject within the process of formulating of the SPRS, besides the overview of the main obligations set by this document covering landscape planning and management, as an example of the current practice, two case studies of Vrnjacka spa and Pribojska spa are presented where special attention within planning documents was given to the protection and enhancement of the landscape. Beside that, as a contribution, it is given the proposal of the preliminary typology of the landscape of Vrnjacke spa within the borders of the Master plan and Pribojska spa within the borders of the Plan of detailed regulation. Taking into consideration the scope of these plans, the landscape is defined as cultural and by more detailed analyses as urban and rural. Within these two types of landscape are separated urban area, the 'core' of the spa, peri-urban area, and within rural forest and agricultural area. One of the main conclusions of this paper is that the inclusion of the landscape within legal framework which is promoting spatial and urban planning, nature and environmental protection is very important prerequisite for adequate planning and management of the landscape in Serbia.

  11. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Tonn, Bruce Edward [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL

    2007-02-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other

  12. Planning for study abroad.

    Science.gov (United States)

    Freeman, L H; Hermann, C P

    1994-01-01

    There is more to planning for study abroad than buying airplane tickets. Providing a successful course away from the host institution requires a great deal of planning by the educator. This planning includes course development, budget, marketing, travel, housing, food, and entertainment. Careful preparation provides both the educator and student a unique and enriching experience that goes beyond the traditional course.

  13. Preliminary AD-Horn Thermomechanical and Electrodynamic Simulations

    CERN Document Server

    AUTHOR|(CDS)2095747; Horvath, David; Calviani, Marco

    2016-01-01

    As part of the Antiproton Decelerator (AD) target area consolidation activities planned for LS2, it has been necessary to perform a comprehensive study of the thermo-structural behaviour of the AD magnetic horn during operation, in order to detail specific requirements for the upgrade projects and testing procedures. The present work illustrates the preliminary results of the finite element analysis carried out to evaluate the thermal and structural behaviour of the device, as well as the methodology used to model and solve the thermomechanical and electrodynamic simulations performed in the AD magnetic horn.

  14. Expectations of a business rescue plan: international directives for ...

    African Journals Online (AJOL)

    Expectations of a business rescue plan: international directives for Chapter 6 implementation. ... AFRICAN JOURNALS ONLINE (AJOL) · Journals · Advanced Search ... Preliminary analysis of business rescue plans suggested that a significant ...

  15. Preliminary study on the corrosion behavior of carbon steel in Horonobe groundwater environment

    International Nuclear Information System (INIS)

    Taniguchi, Naoki; Kogawa, Noritaka; Maeda, Kazuto

    2006-08-01

    It is necessary to understand the corrosion behavior of candidate overpack materials to plan the in-situ engineered barrier test at underground laboratory constructing at Horonobe and to design the overpacks suitable to Horonobe environment. The preliminary corrosion tests of carbon steel which is a candidate material for overpacks were carried out using artificial groundwater and actual groundwater sampled at Horonobe. As the results of anodic polarization experiments, the anodic polarization curves of carbon steel in buffer material were active dissolution type, and the corrosion type of carbon steel in Horonobe groundwater environment was expected to be general corrosion. The results of immersion test under air equilibrium condition showed that the degrees of corrosion localization were not exceeded the data obtained in previous studies. The trend of corrosion rates in buffer material under anaerobic condition were similar to the data obtained in previous studies. Based on the experimental results, it was confirmed that the corrosion assessment model and assumed corrosion rate in second progress report (H12 report) can be applied to the assessment for Horonobe groundwater condition. (author)

  16. Grid-connected ICES: preliminary feasibility analysis and evaluation. Volume 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1977-06-30

    The HEAL Complex in New Orleans will serve as a Demonstration Community for which the ICES Demonstration System will be designed. The complex is a group of hospitals, clinics, research facilities, and medical educational facilities. The five tasks reported on are: preliminary energy analysis; preliminary institutional assessment; conceptual design; firming-up of commitments; and detailed work management plan.

  17. Testing a Preliminary Live with Love Conceptual Framework for cancer couple dyads: A mixed-methods study.

    Science.gov (United States)

    Li, Qiuping; Xu, Yinghua; Zhou, Huiya; Loke, Alice Yuen

    2015-12-01

    The purpose of this study was to test the previous proposed Preliminary Live with Love Conceptual Framework (P-LLCF) that focuses on spousal caregiver-patient couples in their journey of coping with cancer as dyads. A mixed-methods study that included qualitative and quantitative approaches was conducted. Methods of concept and theory analysis, and structural equation modeling (SEM) were applied in testing the P-LLCF. In the qualitative approach in testing the concepts included in the P-LLCF, a comparison was made between the P-LLCF with a preliminary conceptual framework derived from focus group interviews among Chinese couples' coping with cancer. The comparison showed that the concepts identified in the P-LLCF are relevant to the phenomenon under scrutiny, and attributes of the concepts are consistent with those identified among Chinese cancer couple dyads. In the quantitative study, 117 cancer couples were recruited. The findings showed that inter-relationships exist among the components included in the P-LLCF: event situation, dyadic mediators, dyadic appraisal, dyadic coping, and dyadic outcomes. In that the event situation will impact the dyadic outcomes directly or indirectly through Dyadic Mediators. The dyadic mediators, dyadic appraisal, and dyadic coping are interrelated and work together to benefit the dyadic outcomes. This study provides evidence that supports the interlinked components and the relationship included in the P-LLCF. The findings of this study are important in that they provide healthcare professionals with guidance and directions according to the P-LLCF on how to plan supportive programs for couples coping with cancer. Copyright © 2015 Elsevier Ltd. All rights reserved.

  18. Preliminary test results for post irradiation examination on the HTTR fuel

    International Nuclear Information System (INIS)

    Ueta, Shohei; Umeda, Masayuki; Sawa, Kazuhiro; Sozawa, Shizuo; Shimizu, Michio; Ishigaki, Yoshinobu; Obata, Hiroyuki

    2007-01-01

    The future post-irradiation program for the first-loading fuel of the HTTR is scheduled using the HTTR fuel handling facilities and the Hot Laboratory in the Japan Materials Testing Reactor (JMTR) to confirm its irradiation resistance and to obtain data on its irradiation characteristics in the core. This report describes the preliminary test results and the future plan for a post-irradiation examination for the HTTR fuel. In the preliminary test, fuel compacts made with the same SiC-coated fuel particle as the first loading fuel were used. In the preliminary test, dimension, weight, fuel failure fraction, and burnup were measured, and X-ray radiograph, SEM, and EPMA observations were carried out. Finally, it was confirmed that the first-loading fuel of the HTTR showed good quality under an irradiation condition. The future plan for the post-irradiation tests was described to confirm its irradiation performance and to obtain data on its irradiation characteristics in the HTTR core. (author)

  19. Radon concentrations in Norwegian kindergartens: survey planning and preliminary results

    International Nuclear Information System (INIS)

    Birovljev, A.; Strand, T.; Heiberg, A.

    1998-01-01

    An extensive radon survey in Norwegian kindergartens and schools was started in early 1997; so far 2481 kindergartens were examined. Preliminary results of the first phase of the survey are presented in tabular and graphic form including, among others, the dependence of average radon concentration on the construction year of the kindergartens and on the age of the buildings. (A.K.)

  20. Preliminary summary of the ETF conceptual studies

    Science.gov (United States)

    Seikel, G. R.; Bercaw, R. W.; Pearson, C. V.; Owens, W. R.

    1978-01-01

    Power plant studies have shown the attractiveness of MHD topped steam power plants for baseload utility applications. To realize these advantages, a three-phase development program was initiated. In the first phase, the engineering data and experience were developed for the design and construction of a pilot plant, the Engineering Test Facility (ETF). Results of the ETF studies are reviewed. These three parallel independent studies were conducted by industrial teams led by the AVCO Everett Research Laboratory, the General Electric Corporation, and the Westinghouse Corporation. A preliminary analysis and the status of the critical evaluation of these results are presented.

  1. A preliminary neutron crystallographic study of thaumatin

    Energy Technology Data Exchange (ETDEWEB)

    Teixeira, Susana C. M. [ILL-EMBL Deuteration Laboratory, Partnership for Structural Biology, 6 Rue Jules Horowitz, 38042 Grenoble (France); Institut Laue Langevin, 6 Rue Jules Horowitz, 38042 Grenoble (France); EPSAM and ISTM, Keele University, Staffordshire ST5 5BG (United Kingdom); Blakeley, Matthew P. [Institut Laue Langevin, 6 Rue Jules Horowitz, 38042 Grenoble (France); Leal, Ricardo M. F. [ILL-EMBL Deuteration Laboratory, Partnership for Structural Biology, 6 Rue Jules Horowitz, 38042 Grenoble (France); Institut Laue Langevin, 6 Rue Jules Horowitz, 38042 Grenoble (France); EPSAM and ISTM, Keele University, Staffordshire ST5 5BG (United Kingdom); ESRF, 6 Rue Jules Horowitz, BP-220, 38043 Grenoble (France); Mitchell, Edward P. [EPSAM and ISTM, Keele University, Staffordshire ST5 5BG (United Kingdom); ESRF, 6 Rue Jules Horowitz, BP-220, 38043 Grenoble (France); Forsyth, V. Trevor, E-mail: tforsyth@ill.fr [ILL-EMBL Deuteration Laboratory, Partnership for Structural Biology, 6 Rue Jules Horowitz, 38042 Grenoble (France); Institut Laue Langevin, 6 Rue Jules Horowitz, 38042 Grenoble (France); EPSAM and ISTM, Keele University, Staffordshire ST5 5BG (United Kingdom)

    2008-05-01

    Preliminary neutron crystallographic data from the sweet protein thaumatin have been recorded using the LADI-III diffractometer at the Institut Laue Langevin (ILL). The results illustrate the feasibility of a full neutron structural analysis aimed at further understanding the molecular basis of the perception of sweet taste. Such an analysis will exploit the use of perdeuterated thaumatin. A preliminary neutron crystallographic study of the sweet protein thaumatin is presented. Large hydrogenated crystals were prepared in deuterated crystallization buffer using the gel-acupuncture method. Data were collected to a resolution of 2 Å on the LADI-III diffractometer at the Institut Laue Langevin (ILL). The results demonstrate the feasibility of a full neutron crystallographic analysis of this structure aimed at providing relevant information on the location of H atoms, the distribution of charge on the protein surface and localized water in the structure. This information will be of interest for understanding the specificity of thaumatin–receptor interactions and will contribute to further understanding of the molecular mechanisms underlying the perception of taste.

  2. Preliminary criticality study supporting transuranic waste acceptance into the plasma hearth process

    International Nuclear Information System (INIS)

    Slate, L.J.; Santee, G.E. Jr.

    1996-01-01

    This study documents preliminary scoping calculations to address criticality issues associated with the processing of transuranic (TRU) waste and TRU mixed waste in the Plasma Hearth Process (PHP) Test Project. To assess the criticality potential associated with processing TRU waste, the process flow in the PHP is evaluated to identify the stages where criticality could occur. A criticality analysis methodology is then formulated to analyze the criticality potential. Based on these analyses, TRU acceptance criteria can be defined for the PHP. For the current level of analysis, the methodology only assesses the physical system as designed and does not address issues associated with the criticality double contingency principle. The analyses suggest that criticality within the PHP system and within the planned treatment residue (stag) containers does not pose a criticality hazard even when processing waste feed drums containing a quantity of TRU greater than would be reasonably expected. The analyses also indicate that the quantity of TRU that can be processed during each batch is controlled by moving and storage conditions for the resulting slag collection drums

  3. MALLARD REPRODUCTIVE TESTING IN A POND ENVIRONMENT: A PRELIMINARY STUDY

    Science.gov (United States)

    A 2-year preliminary study was conducted on mallard ducks to determine the feasibility of using outdoor pond enclosures for reproductive studies and to evaluate the effects of the insecticide chlorpyrifos on mallard reproduction. No significant reproductive effects were observed ...

  4. Preliminary study to characterize plastic polymers using elemental analyser/isotope ratio mass spectrometry (EA/IRMS).

    Science.gov (United States)

    Berto, Daniela; Rampazzo, Federico; Gion, Claudia; Noventa, Seta; Ronchi, Francesca; Traldi, Umberto; Giorgi, Giordano; Cicero, Anna Maria; Giovanardi, Otello

    2017-06-01

    Plastic waste is a growing global environmental problem, particularly in the marine ecosystems, in consideration of its persistence. The monitoring of the plastic waste has become a global issue, as reported by several surveillance guidelines proposed by Regional Sea Conventions (OSPAR, UNEP) and appointed by the EU Marine Strategy Framework Directive. Policy responses to plastic waste vary at many levels, ranging from beach clean-up to bans on the commercialization of plastic bags and to Regional Plans for waste management and recycling. Moreover, in recent years, the production of plant-derived biodegradable plastic polymers has assumed increasing importance. This study reports the first preliminary characterization of carbon stable isotopes (δ 13 C) of different plastic polymers (petroleum- and plant-derived) in order to increase the dataset of isotopic values as a tool for further investigation in different fields of polymers research as well as in the marine environment surveillance. The δ 13 C values determined in different packaging for food uses reflect the plant origin of "BIO" materials, whereas the recycled plastic materials displayed a δ 13 C signatures between plant- and petroleum-derived polymers source. In a preliminary estimation, the different colours of plastic did not affect the variability of δ 13 C values, whereas the abiotic and biotic degradation processes that occurred in the plastic materials collected on beaches and in seawater, showed less negative δ 13 C values. A preliminary experimental field test confirmed these results. The advantages offered by isotope ratio mass spectrometry with respect to other analytical methods used to characterize the composition of plastic polymers are: high sensitivity, small amount of material required, rapidity of analysis, low cost and no limitation in black/dark samples compared with spectroscopic analysis. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. A New Silver Complex with Ofloxacin – Preliminary Study

    Directory of Open Access Journals (Sweden)

    Rusu Aura

    2016-06-01

    Full Text Available Objective: Silver complexes of antibacterial quinolones have the potential advantage of combining the antibacterial activity of silver and fluoroquinolones. The objective of our study was the preparation and the preliminary physico-chemical characterization of a silver complex with ofloxacin.

  6. Analytic network process (ANP approach for product mix planning in railway industry

    Directory of Open Access Journals (Sweden)

    Hadi Pazoki Toroudi

    2016-08-01

    Full Text Available Given the competitive environment in the global market in recent years, organizations need to plan for increased profitability and optimize their performance. Planning for an appropriate product mix plays essential role for the success of most production units. This paper applies analytical network process (ANP approach for product mix planning for a part supplier in Iran. The proposed method uses four criteria including cost of production, sales figures, supply of raw materials and quality of products. In addition, the study proposes different set of products as alternatives for production planning. The preliminary results have indicated that that the proposed study of this paper could increase productivity, significantly.

  7. Preliminary feasibility study on storage of radioactive wastes in Columbia River basalts. Volume I

    International Nuclear Information System (INIS)

    1976-11-01

    Geologic, hydrologic, heat transfer and rock-waste compatibility studies conducted by the Atlantic Richfield Hanford Company to evaluate the feasibility of storing nuclear wastes in caverns mined out into the Columbia River basalts are discussed. The succession of Columbia River Plateau flood basalts was sampled at various outcrops and in core holes and the samples were analyzed to develop a stratigraphic correlation of the various basalt units and sedimentary interbeds. Hydrologic tests were made in one bore hole to assess the degree of isolation in the various deep aquifers separated by thick basalt accumulations. Earthquake and tectonic studies were conducted to assess the tectonic stability of the Columbia River Plateau. Studies were made to evaluate the extent of heat dissipation from stored radioactive wastes. Geochemical studies were aimed at evaluating the compatibility between the radioactive wastes and the basalt host rocks. Data obtained to-date have allowed development of a hydrostratigraphic framework for the Columbia River Plateau and a preliminary understanding of the deep aquifer systems. Finally, the compilation of this information has served as a basis for planning the studies necessary to define the effectiveness of the Columbia River basalts for permanently isolating nuclear wastes from the biosphere

  8. Development and preliminary experimental study on micro-stacked insulator

    International Nuclear Information System (INIS)

    Ren Chengyan; Yuan Weiqun; Zhang Dongdong; Yan Ping; Wang Jue

    2009-01-01

    High gradient insulating technology is one of the key technologies in new type dielectric wall accelerator(DWA). High gradient insulator, namely micro-stacked insulator, was developed and preliminary experimental study was done. Based on the finite element and particle simulating method, surface electric field distribution and electron movement track of micro-stacked insulator were numerated, and then the optimized design proposal was put forward. Using high temperature laminated method, we developed micro-stacked insulator samples which uses exhaustive fluorinated ethylene propylene(FEP) as dielectric layer and stainless steel as metal layer. Preliminary experiment of vacuum surface flashover in nanosecond pulse voltage was done and micro-stacked insulator exhibited favorable vacuum surface flashover performance with flashover field strength of near 180 kV/cm. (authors)

  9. Preliminary design of a coffee harvester

    Directory of Open Access Journals (Sweden)

    Raphael Magalhães Gomes Moreira

    2016-10-01

    Full Text Available Design of an agricultural machine is a highly complex process due to interactions between the operator, machine, and environment. Mountain coffee plantations constitute an economic sector that requires huge investments for the development of agricultural machinery to improve the harvesting and post-harvesting processes and to overcome the scarcity of work forces in the fields. The aim of this study was to develop a preliminary design for a virtual prototype of a coffee fruit harvester. In this study, a project methodology was applied and adapted for the development of the following steps: project planning, informational design, conceptual design, and preliminary design. The construction of a morphological matrix made it possible to obtain a list of different mechanisms with specific functions. The union between these mechanisms resulted in variants, which were weighed to attribute scores for each selected criterion. From each designated proposal, two variants with the best scores were selected and this permitted the preparation of the preliminary design of both variants. The archetype was divided in two parts, namely the hydraulically articulated arms and the harvesting system that consisted of the vibration mechanism and the detachment mechanism. The proposed innovation involves the use of parallel rods, which were fixed in a plane and rectangular metal sheet. In this step, dimensions including a maximum length of 4.7 m, a minimum length of 3.3 m, and a total height of 2.15 m were identified based on the functioning of the harvester in relation to the coupling point of the tractor.

  10. 78 FR 12676 - Timing Requirements for the Submission of a Site Assessment Plan (SAP) or General Activities Plan...

    Science.gov (United States)

    2013-02-25

    ...: BOEM-2012-0077] RIN 1010-AD77 Timing Requirements for the Submission of a Site Assessment Plan (SAP) or... would amend the timing requirements for submitting a Site Assessment Plan (SAP) or General Activities... and grants will have a preliminary term of 12 months in which a lessee or grantee must submit a SAP or...

  11. Oxygenates in automotive fuels. Consequence analysis - preliminary study

    International Nuclear Information System (INIS)

    Brandberg, Aa.; Saevbark, B.

    1994-01-01

    Oxygenates is used in gasoline due to several reasons. They are added as high-octane components in unleaded gasoline and as agents to reduce the emission of harmful substances. Oxygenates produced from biomass might constitute a coming market for alternative fuels. This preliminary study describes the prerequisites and consequences of such an oxygenate utilization. 39 refs, 9 figs, 5 tabs

  12. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 2. System performance and supporting studies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    The preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas, is presented. System performance analysis and evaluation are described. Feedback of completed performance analyses on current system design and operating philosophy is discussed. The basic computer simulation techniques and assumptions are described and the resulting energy displacement analysis is presented. Supporting technical studies are presented. These include health and safety and reliability assessments; solar collector component evaluation; weather analysis; and a review of selected trade studies which address significant design alternatives. Additional supporting studies which are generally specific to the installation site are reported. These include solar availability analysis; energy load measurements; environmental impact assessment; life cycle cost and economic analysis; heat transfer fluid testing; meteorological/solar station planning; and information dissemination. (WHK)

  13. A preliminary study of mechanistic approach in pavement design to accommodate climate change effects

    Science.gov (United States)

    Harnaeni, S. R.; Pramesti, F. P.; Budiarto, A.; Setyawan, A.

    2018-03-01

    Road damage is caused by some factors, including climate changes, overload, and inappropriate procedure for material and development process. Meanwhile, climate change is a phenomenon which cannot be avoided. The effects observed include air temperature rise, sea level rise, rainfall changes, and the intensity of extreme weather phenomena. Previous studies had shown the impacts of climate changes on road damage. Therefore, several measures to anticipate the damage should be considered during the planning and construction in order to reduce the cost of road maintenance. There are three approaches generally applied in the design of flexible pavement thickness, namely mechanistic approach, mechanistic-empirical (ME) approach and empirical approach. The advantages of applying mechanistic approach or mechanistic-empirical (ME) approaches are its efficiency and reliability in the design of flexible pavement thickness as well as its capacity to accommodate climate changes in compared to empirical approach. However, generally, the design of flexible pavement thickness in Indonesia still applies empirical approach. This preliminary study aimed to emphasize the importance of the shifting towards a mechanistic approach in the design of flexible pavement thickness.

  14. Medical Audit: A Nigerian Teaching Hospital's Preliminary Experience

    African Journals Online (AJOL)

    The definition, historical background, aims dimensions and the characteristics of medical audit as well as the indices to be measured in a medical audit exercise are highlighted. The preliminary experience of the University of Ilorin Teaching Hospital (UITH) in the planning, implementation and monitoring of a viable medical ...

  15. Reliability criteria selection for integrated resource planning

    International Nuclear Information System (INIS)

    Ruiu, D.; Ye, C.; Billinton, R.; Lakhanpal, D.

    1993-01-01

    A study was conducted on the selection of a generating system reliability criterion that ensures a reasonable continuity of supply while minimizing the total costs to utility customers. The study was conducted using the Institute for Electronic and Electrical Engineers (IEEE) reliability test system as the study system. The study inputs and results for conditions and load forecast data, new supply resources data, demand-side management resource data, resource planning criterion, criterion value selection, supply side development, integrated resource development, and best criterion values, are tabulated and discussed. Preliminary conclusions are drawn as follows. In the case of integrated resource planning, the selection of the best value for a given type of reliability criterion can be done using methods similar to those used for supply side planning. The reliability criteria values previously used for supply side planning may not be economically justified when integrated resource planning is used. Utilities may have to revise and adopt new, and perhaps lower supply reliability criteria for integrated resource planning. More complex reliability criteria, such as energy related indices, which take into account the magnitude, frequency and duration of the expected interruptions are better adapted than the simpler capacity-based reliability criteria such as loss of load expectation. 7 refs., 5 figs., 10 tabs

  16. Preliminary design package for solar collector and solar pump

    Science.gov (United States)

    1978-01-01

    A solar-operated pump using an existing solar collector, for use on solar heating and cooling and hot water systems is described. Preliminary design criteria of the collector and solar-powered pump is given including: design drawings, verification plans, and hazard analysis.

  17. From Reactionary to Responsive: Applying the Internal Environmental Scan Protocol to Lifelong Learning Strategic Planning and Operational Model Selection

    Science.gov (United States)

    Downing, David L.

    2009-01-01

    This study describes and implements a necessary preliminary strategic planning procedure, the Internal Environmental Scanning (IES), and discusses its relevance to strategic planning and university-sponsored lifelong learning program model selection. Employing a qualitative research methodology, a proposed lifelong learning-centric IES process…

  18. Nevada potential repository preliminary transportation strategy: Study 1

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1995-04-01

    Limited feasible options exist when considering the shipment of spent nuclear fuel and high-level radioactive waste. These options are rail or truck; because of the weight associated with transportation casks (68.0 to 113.4 tonnes/75 to 125 tons), heavy-haul trucks are also considered. Yucca Mountain currently lacks rail service or an existing right-of-way for rail; it also lacks a dedicated highway suitable for heavy-haul trucks. Approximately 11,230 shipments by rail are planned from waste producer sites to Nevada, with an additional 1,041 shipments by legal-weight truck from four reactor sites not capable of upgrading for rail shipment. This study identifies the reasonable alternatives for waste transport to the potential repository site, describes the evaluation process performed to identify those alternatives, and discusses the reasons for elimination of transportation routes deemed to be not reasonable. The study concluded that heavy haul truck transportation is feasible-cost is very favorable when compared to rail-but route restrictions must be further evaluated. In addition to restrictions due to seasonal weather conditions, specific routes have additional restrictions, including no travel on holidays or weekends, and travel during daylight hours only. Further restrictions will be imposed by the U.S. Department of Transportation based on routing of radioactive materials by highway. Operation and maintenance costs for heavy-haul over a 24-year period, based on preliminary information, were calculated on an estimated operational cost of $15,000 per trip, with an estimated 468 trips per year average (11,230 total trips), for an estimated cost of $171 million to $173 million, depending on the route used. Because the initial costs and the total system life cycle costs of heavy-haul are approximately 50 percent lower than the lowest rail cost, this option will continue to be evaluated.

  19. Nevada potential repository preliminary transportation strategy: Study 1

    International Nuclear Information System (INIS)

    1995-04-01

    Limited feasible options exist when considering the shipment of spent nuclear fuel and high-level radioactive waste. These options are rail or truck; because of the weight associated with transportation casks (68.0 to 113.4 tonnes/75 to 125 tons), heavy-haul trucks are also considered. Yucca Mountain currently lacks rail service or an existing right-of-way for rail; it also lacks a dedicated highway suitable for heavy-haul trucks. Approximately 11,230 shipments by rail are planned from waste producer sites to Nevada, with an additional 1,041 shipments by legal-weight truck from four reactor sites not capable of upgrading for rail shipment. This study identifies the reasonable alternatives for waste transport to the potential repository site, describes the evaluation process performed to identify those alternatives, and discusses the reasons for elimination of transportation routes deemed to be not reasonable. The study concluded that heavy haul truck transportation is feasible-cost is very favorable when compared to rail-but route restrictions must be further evaluated. In addition to restrictions due to seasonal weather conditions, specific routes have additional restrictions, including no travel on holidays or weekends, and travel during daylight hours only. Further restrictions will be imposed by the U.S. Department of Transportation based on routing of radioactive materials by highway. Operation and maintenance costs for heavy-haul over a 24-year period, based on preliminary information, were calculated on an estimated operational cost of $15,000 per trip, with an estimated 468 trips per year average (11,230 total trips), for an estimated cost of $171 million to $173 million, depending on the route used. Because the initial costs and the total system life cycle costs of heavy-haul are approximately 50 percent lower than the lowest rail cost, this option will continue to be evaluated

  20. Career Planning Modules for the Officer Career Information and Planning System.

    Science.gov (United States)

    Phillips, Susan D.; And Others

    This discussion of the modules in an experimental computer-aided system for officer career information and planning system (OCIPS) includes the reasons for its development, a description of the seven modules, and the findings of a preliminary test of four of the modules for feasibility and credibility. Initially developed in response to a need…

  1. Preliminary Study of a Piston Pump for Cryogenic Fluids

    Science.gov (United States)

    Biermann, Arnold E.; Kohl, Robert C.

    1959-01-01

    Preliminary data are presented covering the performance of a low-speed, five-cylinder piston pump designed for handling boiling hydrogen. This pump was designed for a flow of 55 gallons per minute at 240 rpm with a discharge pressure of 135 pounds per square inch. Tests were made using JP-4 fuel, liquid nitrogen, and liquid hydrogen. Pump delivery and endurance characteristics were satisfactory for the range of operation covered. In connection with the foregoing pump development, the cavitation characteristics of a preliminary visual model, glass-cylinder pump and of a simple reciprocating disk were studied. Subcooling of approximately 0.60 F was obtained from the cavitation produced by reciprocating a disk in boiling nitrogen and in boiling water. The subcooling obtained in a similar manner with liquid hydrogen was somewhat less.

  2. Preliminary study on the establishment of the radionuclide declaration methods for radionuclides in LILW radioactive waste

    International Nuclear Information System (INIS)

    Hwang, K. H.; Lee, K. J.; Jung, C. W.

    2003-01-01

    The preliminary study on declaration methods has been done for each radionuclide in LILW radwaste drum in Korean NPPs. View from the preliminary establishment of radio nuclide declaration methods, The selection of assessment target nuclide through the qualitative method and preliminary criteria for routine declaration methods in each radio nuclide was derived. First of all, selection criteria and preliminary assessment method for each target radionuclide was surveyed and investigated. And, the selection criteria and selected the target radio nuclides from the basis on criteria was derived. And the preliminary suggestion about the declaration methods for each target radio nuclide was established

  3. Online gaming dependency: a preliminary study in China.

    Science.gov (United States)

    Peng, Wei; Liu, Ming

    2010-06-01

    Based on theories and previous studies on problematic Internet use, we propose a model to better understand the contributors to and consequences of online gaming dependency. A preliminary study was conducted through a survey of online gamers in China. The results of path analysis found that maladaptive cognitions, shyness, and depression are positively related to online gaming dependency. Online gaming dependency was also positively related to different types of negative life outcomes. The findings of this study have implications for the prevention and treatment of addictive online gaming.

  4. Resting-state functional magnetic resonance imaging for surgical planning in pediatric patients: a preliminary experience.

    Science.gov (United States)

    Roland, Jarod L; Griffin, Natalie; Hacker, Carl D; Vellimana, Ananth K; Akbari, S Hassan; Shimony, Joshua S; Smyth, Matthew D; Leuthardt, Eric C; Limbrick, David D

    2017-12-01

    OBJECTIVE Cerebral mapping for surgical planning and operative guidance is a challenging task in neurosurgery. Pediatric patients are often poor candidates for many modern mapping techniques because of inability to cooperate due to their immature age, cognitive deficits, or other factors. Resting-state functional MRI (rs-fMRI) is uniquely suited to benefit pediatric patients because it is inherently noninvasive and does not require task performance or significant cooperation. Recent advances in the field have made mapping cerebral networks possible on an individual basis for use in clinical decision making. The authors present their initial experience translating rs-fMRI into clinical practice for surgical planning in pediatric patients. METHODS The authors retrospectively reviewed cases in which the rs-fMRI analysis technique was used prior to craniotomy in pediatric patients undergoing surgery in their institution. Resting-state analysis was performed using a previously trained machine-learning algorithm for identification of resting-state networks on an individual basis. Network maps were uploaded to the clinical imaging and surgical navigation systems. Patient demographic and clinical characteristics, including need for sedation during imaging and use of task-based fMRI, were also recorded. RESULTS Twenty patients underwent rs-fMRI prior to craniotomy between December 2013 and June 2016. Their ages ranged from 1.9 to 18.4 years, and 12 were male. Five of the 20 patients also underwent task-based fMRI and one underwent awake craniotomy. Six patients required sedation to tolerate MRI acquisition, including resting-state sequences. Exemplar cases are presented including anatomical and resting-state functional imaging. CONCLUSIONS Resting-state fMRI is a rapidly advancing field of study allowing for whole brain analysis by a noninvasive modality. It is applicable to a wide range of patients and effective even under general anesthesia. The nature of resting

  5. Regional cooperation for emergency plan

    International Nuclear Information System (INIS)

    Chu, D.S.L.; Liu, P.C.

    1981-01-01

    It has become increasingly evident since the Three Mile Island (TMI) accident that a sound emergency plan is indispensable to the overall nuclear power generation program. In some developing countries in Eastern Aisa, the availability of manpower resources and facilities to handle a nuclear power plant accident are rather limited. Therefore, the establishment of a regional mutual emergency plan is deemed necessary. A preliminary idea concerning this establishment is presented for deliberation by this Conference

  6. A systematic process for developing and assessing accident management plans

    International Nuclear Information System (INIS)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W.

    1991-04-01

    This document describes a four-phase approach for developing criteria recommended for use in assessing the adequacy of nuclear power plant accident management plans. Two phases of the approach have been completed and provide a prototype process that could be used to develop an accident management plan. Based on this process, a preliminary set of assessment criteria are derived. These preliminary criteria will be refined and improved when the remaining steps of the approach are completed, that is, after the prototype process is validated through application. 9 refs., 10 figs., 7 tabs

  7. Preliminary study on the dye removal efficacy of immobilized marine ...

    African Journals Online (AJOL)

    Preliminary study on the dye removal efficacy of immobilized marine and freshwater microalgal beads from textile wastewater. SD Kumar, P Santhanam, R Nandakumar, S Anath, B Balaji Prasath, A Shenbaga Devi, S Jeyanthi, T Jayalakshima, P Ananthi ...

  8. Preliminary design package for solar heating and hot water system

    Science.gov (United States)

    1976-01-01

    Two prototype solar heating and hot water systems for use in single-family dwellings or commercial buildings were designed. Subsystems included are: collector, storage, transport, hot water, auxiliary energy, and government-furnished site data acquisition. The systems are designed for Yosemite, California, and Pueblo, Colorado. The necessary information to evaluate the preliminary design for these solar heating and hot water systems is presented. Included are a proposed instrumentation plan, a training program, hazard analysis, preliminary design drawings, and other information about the design of the system.

  9. Performance assessment plans and methods for the Salt Repository Project

    International Nuclear Information System (INIS)

    1984-08-01

    This document presents the preliminary plans and anticipated methods of the Salt Repository Project (SRP) for assessing the postclosure and radiological aspects of preclosure performance of a nuclear waste repository in salt. This plan is intended to be revised on an annual basis. The emphasis in this preliminary effort is on the method of conceptually dividing the system into three subsystems (the very near field, the near field, and the far field) and applying models to analyze the behavior of each subsystem and its individual components. The next revision will contain more detailed plans being developed as part of Site Characterization Plan (SCP) activities. After a brief system description, this plan presents the performance targets which have been established for nuclear waste repositories by regulatory agencies (Chapter 3). The SRP approach to modeling, including sensitivity and uncertainty techniques is then presented (Chapter 4). This is followed by a discussion of scenario analysis (Chapter 5), a presentation of preliminary data needs as anticipated by the SRP (Chapter 6), and a presentation of the SRP approach to postclosure assessment of the very near field, the near field, and the far field (Chapters 7, 8, and 9, respectively). Preclosure radiological assessment is discussed in Chapter 10. Chapter 11 presents the SRP approach to code verification and validation. Finally, the Appendix lists all computer codes anticipated for use in performance assessments. The list of codes will be updated as plans are revised

  10. Hybrid supply chain model for material requirement planning under financial constraints: A case study

    Science.gov (United States)

    Curci, Vita; Dassisti, Michele; Josefa, Mula Bru; Manuel, Díaz Madroñero

    2014-10-01

    Supply chain model (SCM) are potentially capable to integrate different aspects in supporting decision making for enterprise management tasks. The aim of the paper is to propose an hybrid mathematical programming model for optimization of production requirements resources planning. The preliminary model was conceived bottom-up from a real industrial case analysed oriented to maximize cash flow. Despite the intense computational effort required to converge to a solution, optimisation done brought good result in solving the objective function.

  11. Radiology workstation for mammography: preliminary observations, eyetracker studies, and design

    Science.gov (United States)

    Beard, David V.; Johnston, Richard E.; Pisano, Etta D.; Hemminger, Bradley M.; Pizer, Stephen M.

    1991-07-01

    For the last four years, the UNC FilmPlane project has focused on constructing a radiology workstation facilitating CT interpretations equivalent to those with film and viewbox. Interpretation of multiple CT studies was originally chosen because handling such large numbers of images was considered to be one of the most difficult tasks that could be performed with a workstation. The authors extend the FilmPlane design to address mammography. The high resolution and contrast demands coupled with the number of images often cross- compared make mammography a difficult challenge for the workstation designer. This paper presents the results of preliminary work with workstation interpretation of mammography. Background material is presented to justify why the authors believe electronic mammographic workstations could improve health care delivery. The results of several observation sessions and a preliminary eyetracker study of multiple-study mammography interpretations are described. Finally, tentative conclusions of what a mammographic workstation might look like and how it would meet clinical demand to be effective are presented.

  12. Preliminary study of soil permeability properties using principal component analysis

    Science.gov (United States)

    Yulianti, M.; Sudriani, Y.; Rustini, H. A.

    2018-02-01

    Soil permeability measurement is undoubtedly important in carrying out soil-water research such as rainfall-runoff modelling, irrigation water distribution systems, etc. It is also known that acquiring reliable soil permeability data is rather laborious, time-consuming, and costly. Therefore, it is desirable to develop the prediction model. Several studies of empirical equations for predicting permeability have been undertaken by many researchers. These studies derived the models from areas which soil characteristics are different from Indonesian soil, which suggest a possibility that these permeability models are site-specific. The purpose of this study is to identify which soil parameters correspond strongly to soil permeability and propose a preliminary model for permeability prediction. Principal component analysis (PCA) was applied to 16 parameters analysed from 37 sites consist of 91 samples obtained from Batanghari Watershed. Findings indicated five variables that have strong correlation with soil permeability, and we recommend a preliminary permeability model, which is potential for further development.

  13. PTSD and Impaired Eye Expression Recognition: A Preliminary Study

    Science.gov (United States)

    Schmidt, Jakob Zeuthen; Zachariae, Robert

    2009-01-01

    This preliminary study examined whether posttraumatic stress disorder (PTSD) was related to difficulties in identifying the mental states of others in a group of refugees. Sixteen Bosnian refugees, referred to treatment in an outpatient treatment center for survivors of torture and war-related trauma in Denmark (CETT), were compared to 16 non-PTSD…

  14. Spirituality and the Events of September 11: A Preliminary Study

    Science.gov (United States)

    Briggs, Michele Kielty; Apple, Kevin J.; Aydlett, Ann E.

    2004-01-01

    Personal crises have been associated with spiritual growth. Sparked by the global response to the crisis of September 11, 2001, this study examined the relationship of spirituality and the September 11 tragedy using a sample of convenience from a college student population. This preliminary study used an experimental design to examine various…

  15. Preliminary environmental assessment for the satellite power system (SPS)

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-01

    A preliminary assessment of the impact of the Satellite Power System (SPS) on the environment is presented. Information that has appeared in documents referenced herein is integrated and assimilated. The state-of-knowledge as perceived from recently completed DOE-sponsored studies is disclosed, and prospective research and study programs that can advance the state-of-knowledge and provide an expanded data base for use in an assessment planned for 1980 are defined. Alternatives for research that may be implemented in order to achieve this advancement are also discussed in order that a plan can be selected which will be consistent with the fiscal and time constraints on the SPS Environmental Assessment Program. Health and ecological effects of microwave radiation, nonmicrowave effects on health and the environment (terrestrial operations and space operations), effects on the atmosphere, and effects on communications systems are examined in detail. (WHK)

  16. A preliminary study on the relevancy of sustainable building design ...

    African Journals Online (AJOL)

    This preliminary study aims to explore the relationship between sustainable building design paradigms and commercial property depreciation, to assist in the understanding of sustainable building design impact towards commercial building value and rental de employs the qualitative method and analyses valuers' current ...

  17. A Preliminary Study toward Consistent Soil Moisture from AMSR2

    NARCIS (Netherlands)

    Parinussa, R.M.; Holmes, T.R.H.; Wanders, N.; Dorigo, W.A.; de Jeu, R.A.M.

    2015-01-01

    A preliminary study toward consistent soil moisture products from the Advanced Microwave Scanning Radiometer 2 (AMSR2) is presented. Its predecessor, the Advanced Microwave Scanning Radiometer for Earth Observing System (AMSR-E), has providedEarth scientists with a consistent and continuous global

  18. Preliminary study and Identification of insects' species of forensic ...

    African Journals Online (AJOL)

    The proper identification of the insect and arthropod species of forensic importance is the most crucial element in the field of forensic entomology. The main objective in this study was the identification of insects' species of forensic importance in Urmia (37°, 33 N. and 45°, 4, 45 E.) and establishment of a preliminary ...

  19. Preliminary study on chicken feather protein-based wood adhesives

    Science.gov (United States)

    Zehui Jiang; Daochun Qin; Chung-Yun Hse; Monlin Kuo; Zhaohui Luo; Ge Wang; Yan Yu

    2008-01-01

    The objective of this preliminary study was to partially replace phenol in the synthesis of phenol-formaldehyde resin with feather protein. Feather protein–based resins, which contained one part feather protein and two parts phenol, were formulated under the conditions of two feather protein hydrolysis methods (with and without presence of phenol during...

  20. Life sciences payload definition and integration study, task C and D. Volume 2: Payload definition, integration, and planning studies

    Science.gov (United States)

    1973-01-01

    The Life Sciences Payload Definition and Integration Study was composed of four major tasks. Tasks A and B, the laboratory definition phase, were the subject of prior NASA study. The laboratory definition phase included the establishment of research functions, equipment definitions, and conceptual baseline laboratory designs. These baseline laboratories were designated as Maxi-Nom, Mini-30, and Mini-7. The outputs of Tasks A and B were used by the NASA Life Sciences Payload Integration Team to establish guidelines for Tasks C and D, the laboratory integration phase of the study. A brief review of Tasks A and B is presented provide background continuity. The tasks C and D effort is the subject of this report. The Task C effort stressed the integration of the NASA selected laboratory designs with the shuttle sortie module. The Task D effort updated and developed costs that could be used by NASA for preliminary program planning.

  1. Preliminary waste acceptance requirements - Konrad repository project

    International Nuclear Information System (INIS)

    Brennecke, P.W.; Warnecke, E.H.

    1991-01-01

    In Germany, the planned Konrad repository is proposed for the disposal of all types of radioactive wastes whose thermal influence upon the host rock is negligible. The Bundesamt fuer Strahlenschutz has established Preliminary Waste Acceptance Requirements (as of April 1990) for this facility. The respective requirements were developed on the basis of the results of site-specific safety assessments. They include general requirements on the waste packages to be disposed of as well as more specific requirements on the waste forms, the packaging and the radionuclide inventory per waste package. In addition, the delivery of waste packages was regulated. An outline of the structure and the elements of the Preliminary Waste Acceptance Requirements of April 1990 is given including comments on their legal status. (Author)

  2. Muon-catalyzed fusion experiment target and detector system. Preliminary design report

    International Nuclear Information System (INIS)

    Jones, S.E.; Watts, K.D.; Caffrey, A.J.; Walter, J.B.

    1982-03-01

    We present detailed plans for the target and particle detector systems for the muon-catalyzed fusion experiment. Requirements imposed on the target vessel by experimental conditions and safety considerations are delineated. Preliminary designs for the target vessel capsule and secondary containment vessel have been developed which meet these requirements. In addition, the particle detection system is outlined, including associated fast electronics and on-line data acquisition. Computer programs developed to study the target and detector system designs are described

  3. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  4. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results

    Energy Technology Data Exchange (ETDEWEB)

    Chandler, K.; Eudy, L.

    2008-10-01

    This report provides preliminary results from a National Renewable Energy Laboratory evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment; early results and agency experience are also provided.

  5. LM-OSL from single grains of quartz: A preliminary study

    DEFF Research Database (Denmark)

    Bulur, E.; Duller, G.A.T.; Solongo, S.

    2002-01-01

    the easy-to-bleach component, those with only the hard-to-bleach component, and those exhibiting all components. The results of this preliminary study show that LM-OSL experiments carried out at the single grain level may give important insights into the luminescence properties observed when viewing...

  6. Hanford Waste Vitrification Plant: Preliminary description of waste form and canister

    International Nuclear Information System (INIS)

    Mitchell, D.E.

    1986-01-01

    In July 1985, the US Department of Energy's Office of Civilian Radioactive Waste Management established the Waste Acceptance Process as the means by which defense high-level waste producers, such as the Hanford Waste Vitrification Plant, will develop waste acceptance requirements with the candidate geologic repositories. A complete description of the Waste Acceptance Process is contained in the Preliminary Hanford Waste Vitrification Plant Waste Form Qualification Plan. The Waste Acceptance Process defines three documents that high-level waste producers must prepare as a part of the process of assuming that a high-level waste product will be acceptable for disposal in a geologic repository. These documents are the Description of Waste Form and Canister, Waste Compliance Plan, and Waste Qualification Report. This document is the Hanford Waste Vitrification Plant Preliminary Description of Waste Form and Canister for disposal of Neutralized Current Acid Waste. The Waste Acceptance Specifications for the Hanford Waste Vitrification Plant have not yet been developed, therefore, this document has been structured to corresponds to the Waste Acceptance Preliminary Specifications for the Defense Waste Processing Facility High-Level Waste Form. Not all of the information required by these specifications is appropriate for inclusion in this Preliminary Description of Waste Form and Canister. Rather, this description is limited to information that describes the physical and chemical characteristics of the expected high-level waste form. The content of the document covers three major areas: waste form characteristics, canister characteristics, and canistered waste form characteristics. This information will be used by the candidate geologic repository projects as the basis for preliminary repository design activities and waste form testing. Periodic revisions are expected as the Waste Acceptance Process progresses

  7. Preliminary evaluation of 30 potential granitic rock sites for a radioactive waste storage facility in southern Nevada

    International Nuclear Information System (INIS)

    Boardman, C.R.; Knutson, C.F.

    1978-01-01

    Results of preliminary study are presented which was performed under subtask 2.7 of the NTS Terminal Waste Storage Program Plan for 1978. Subtask 2.7 examines the feasibility of locating a nuclear waste repository in a granitic stock or pluton in southern Nevada near the Nevada Test Site (NTS). It is assumed for the purposes of this study that such a repository cannot be located at NTS. This assumption may or may not be correct. This preliminary report does not identify a particular site as being a suitable location for a repository. Nor does it absolutely eliminate a particular site from further consideration. It does, however, answer the basic question of probable suitability of some of the sites and present a systematic method for site evaluation. Since the findings of this initial study have been favorable, it will be followed by more exhaustive and detailed studies of the original 30 sites and perhaps others. In future studies some of the evaluation criteria used in the preliminary study may be modified or eliminated, and new criteria may be introduced

  8. Preliminary evaluation of 30 potential granitic rock sites for a radioactive waste storage facility in southern Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Boardman, C.R.; Knutson, C.F.

    1978-02-15

    Results of preliminary study are presented which was performed under subtask 2.7 of the NTS Terminal Waste Storage Program Plan for 1978. Subtask 2.7 examines the feasibility of locating a nuclear waste repository in a granitic stock or pluton in southern Nevada near the Nevada Test Site (NTS). It is assumed for the purposes of this study that such a repository cannot be located at NTS. This assumption may or may not be correct. This preliminary report does not identify a particular site as being a suitable location for a repository. Nor does it absolutely eliminate a particular site from further consideration. It does, however, answer the basic question of probable suitability of some of the sites and present a systematic method for site evaluation. Since the findings of this initial study have been favorable, it will be followed by more exhaustive and detailed studies of the original 30 sites and perhaps others. In future studies some of the evaluation criteria used in the preliminary study may be modified or eliminated, and new criteria may be introduced.

  9. Novel hyperthermia applicator system allows adaptive treatment planning: Preliminary clinical results in tumour-bearing animals.

    Science.gov (United States)

    Dressel, S; Gosselin, M-C; Capstick, M H; Carrasco, E; Weyland, M S; Scheidegger, S; Neufeld, E; Kuster, N; Bodis, S; Rohrer Bley, C

    2017-09-11

    Hyperthermia (HT) as an adjuvant to radiation therapy (RT) is a multimodality treatment method to enhance therapeutic efficacy in different tumours. High demands are placed on the hardware and treatment planning software to guarantee adequately planned and applied HT treatments. The aim of this prospective study was to determine the effectiveness and safety of the novel HT system in tumour-bearing dogs and cats in terms of local response and toxicity as well as to compare planned with actual achieved data during heating. A novel applicator with a flexible number of elements and integrated closed-loop temperature feedback control system, and a tool for patient-specific treatment planning were used in a combined thermoradiotherapy protocol. Good agreement between predictions from planning and clinical outcome was found in 7 of 8 cases. Effective HT treatments were planned and verified with the novel system and provided improved quality of life in all but 1 patient. This individualized treatment planning and controlled heat exposure allows adaptive, flexible and safe HT treatments in palliatively treated animal patients. © 2017 John Wiley & Sons Ltd.

  10. Development of short Indonesian lesson plan to improve teacher performance

    Science.gov (United States)

    Yulianto, B.; Kamidjan; Ahmadi, A.; Asteria, P. V.

    2018-01-01

    The developmental research was motivated by the results of preliminary study through interviews, which revealed almost all of the teachers did not create lesson plan themselves. As a result of this load, the performance of the real learning in the classroom becomes inadequate. Moreover, when lesson plan was not made by teachers themselves, the learning process becomes ineffective. Therefore, this study designed to develop a prototype of the short lesson plan, in particular, Indonesian language teaching, and to investigate its effectiveness. The participants in the study were teachers who were trained through lesson study group to design short model’s lesson plan. Questionnaires and open-ended questions were used, and the quantitative and qualitative data obtained were analyzed accordingly. The analysis of the quantitative data, aided with SPSS, were frequency, percentage, and means, whereas the qualitative data were analyzed descriptively. The results showed that the teachers liked the model, and they were willing to design their own lesson plan. The observation data revealed that the classroom learning process became more interactive, and classroom atmosphere was more engaging and natural because the teachers did not stick to the lesson plan made by other teachers.

  11. A text-based data mining and toxicity prediction modeling system for a clinical decision support in radiation oncology: A preliminary study

    Science.gov (United States)

    Kim, Kwang Hyeon; Lee, Suk; Shim, Jang Bo; Chang, Kyung Hwan; Yang, Dae Sik; Yoon, Won Sup; Park, Young Je; Kim, Chul Yong; Cao, Yuan Jie

    2017-08-01

    The aim of this study is an integrated research for text-based data mining and toxicity prediction modeling system for clinical decision support system based on big data in radiation oncology as a preliminary research. The structured and unstructured data were prepared by treatment plans and the unstructured data were extracted by dose-volume data image pattern recognition of prostate cancer for research articles crawling through the internet. We modeled an artificial neural network to build a predictor model system for toxicity prediction of organs at risk. We used a text-based data mining approach to build the artificial neural network model for bladder and rectum complication predictions. The pattern recognition method was used to mine the unstructured toxicity data for dose-volume at the detection accuracy of 97.9%. The confusion matrix and training model of the neural network were achieved with 50 modeled plans (n = 50) for validation. The toxicity level was analyzed and the risk factors for 25% bladder, 50% bladder, 20% rectum, and 50% rectum were calculated by the artificial neural network algorithm. As a result, 32 plans could cause complication but 18 plans were designed as non-complication among 50 modeled plans. We integrated data mining and a toxicity modeling method for toxicity prediction using prostate cancer cases. It is shown that a preprocessing analysis using text-based data mining and prediction modeling can be expanded to personalized patient treatment decision support based on big data.

  12. Preliminary study of radium-contaminated soils

    Energy Technology Data Exchange (ETDEWEB)

    Healy, J.W.; Rodgers, J.C.

    1978-10-01

    A preliminary study was made of the potential radiation exposures to people from radium-226 contamination in the soil in order to provide guidance on limits to be applied in decontaminating land. Pathways included were inhalation of radium from resuspension; ingestion of radium with foods; external gamma radiation from radium daughters; inhalation of radon and daughter, both in the open air and in houses; and the intake of /sup 210/Pb and /sup 210/Po from both inhalation and ingestion. The depth of the contaminated layer is of importance for external exposure and especially for radon emanation. The most limiting pathway was found to be emanation of the radon into buildings with limiting values comparable to those found naturally in many areas.

  13. Preliminary study of radium-contaminated soils

    International Nuclear Information System (INIS)

    Healy, J.W.; Rodgers, J.C.

    1978-10-01

    A preliminary study was made of the potential radiation exposures to people from radium-226 contamination in the soil in order to provide guidance on limits to be applied in decontaminating land. Pathways included were inhalation of radium from resuspension; ingestion of radium with foods; external gamma radiation from radium daughters; inhalation of radon and daughter, both in the open air and in houses; and the intake of 210 Pb and 210 Po from both inhalation and ingestion. The depth of the contaminated layer is of importance for external exposure and especially for radon emanation. The most limiting pathway was found to be emanation of the radon into buildings with limiting values comparable to those found naturally in many areas

  14. Repository Subsurface Preliminary Fire Hazard Analysis

    International Nuclear Information System (INIS)

    Logan, Richard C.

    2001-01-01

    This fire hazard analysis identifies preliminary design and operations features, fire, and explosion hazards, and provides a reasonable basis to establish the design requirements of fire protection systems during development and emplacement phases of the subsurface repository. This document follows the Technical Work Plan (TWP) (CRWMS M and O 2001c) which was prepared in accordance with AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities''; Attachment 4 of AP-ESH-008, ''Hazards Analysis System''; and AP-3.11Q, ''Technical Reports''. The objective of this report is to establish the requirements that provide for facility nuclear safety and a proper level of personnel safety and property protection from the effects of fire and the adverse effects of fire-extinguishing agents

  15. A preliminary study on growth response of broiler finishers fed ...

    African Journals Online (AJOL)

    A preliminary study on growth response of broiler finishers fed processed mottle Mucuna beans ( Mucuna pruriens var. utilis ) ... They were fed diets (20% CP, 13 MJME/kg) incorporating 0%, 5% and 10% processed mottle “Mucuna” beans. A completely randomized design was used. Feed and water were supplied and ...

  16. Preliminary consideration for research on geological disposal of high-level radioactive waste in China in the period of 2000-2040

    International Nuclear Information System (INIS)

    Xu Guoqing

    2004-01-01

    Based on the overseas practical experiences with combination of domestic realistic conditions a preliminary consideration of a long-range plan is proposed for research on geological disposal of high-level radioactive waste in China in the period of 2000-2040. An overview of research on geological disposal of high-level radioactive waste in the overseas and mainland is presented shortly first in this paper. Then the discussion is centered on the preliminary consideration of a long-range plan for research on geological disposal of high-level radioactive waste in China. The partition of stages of research on geological disposal of high-level radioactive waste, the goal, task, research contents and time table for each research stage is stated in this preliminary consideration. The data mentioned above will probably be useful for making plan for geological disposal of high-level radioactive waste in the future in China. (author)

  17. Preliminary neutronic study on Pu-based OTTO cycle pebble bed reactor

    Energy Technology Data Exchange (ETDEWEB)

    Setiadipura, Topan; Zuhair [National Nuclear Energy Agency of Indonesia (BATAN), Selatan (Indonesia). Center for Nuclear Reactor Technology and Safety; Irwanto, Dwi [Bandung Institute of Technology (ITB), Bandung (Indonesia). Nuclear Physics and Biophysics Research Group

    2017-12-15

    The neutron physics characteristic of Pebble Bed Reactor (PBR) allows a better incineration of plutonium (Pu). An optimized design of simple PBR might give a symbiotic solution of providing a safe energy source, effective fuel utilization shown by a higher burnup value, and incineration of Pu stockpiles. This study perform a preliminary neutronic design study of a 200 MWt Once Through Then Out (OTTO) cycle PBR with Pu-based fuel. The safety criteria of the design were represented by the per-fuel-pebble maximum power generation of 4.5 kW/pebble. In this preliminary phase, the parametric survey is limited to the heavy metal (HM) loading per pebble and the average axial speed of the fuel. An optimum high burnup of 419.7 MWd/kg-HM was achieved in this study. This optimum design uses a HM loading of 2.5 g/pebble with average axial fuel velocity 0.5 cm/day.

  18. In Vitro Studies and Preliminary Mathematical Model for Jet Fuel and Noise Induced Auditory Impairment

    Science.gov (United States)

    2015-06-01

    of JP-8 and a Fischer- Tropsch synthetic jet fuel following subacute inhalation exposure in rats. Toxicol Sci 116(1): 239-248. Gallinat, J...AFRL-RH-WP-TR-2015-0084 IN VITRO STUDIES AND PRELIMINARY MATHEMATICAL MODEL FOR JET FUEL AND NOISE INDUCED AUDITORY IMPAIRMENT...April 2014 – September 2014 4. TITLE AND SUBTITLE In Vitro Studies and Preliminary Mathematical Model for Jet Fuel and Noise Induced Auditory

  19. Socioeconomic Site Study Plan: Draft

    International Nuclear Information System (INIS)

    1987-07-01

    Social and economic issues and concerns of the Deak Smith County site area will be evaluated during site characterization. Effects that the area could experience from a repository project include demographic, economic, community service, fiscal, and social impacts. The Socioeconomic Site Study Plan is designed to provide a strategy to assess the potential for those impacts. The Socioeconomic Site Study Plan is structured to provide an overview of the socioeconomic program requirements, objectives, and activities to be conducted during site characterization. This report will describe the study design and its rationale; data collection, management, and reporting; program schedules and milestones; site study organization and management; and quality assurance issues. 43 refs

  20. Options for Parallelizing a Planning and Scheduling Algorithm

    Science.gov (United States)

    Clement, Bradley J.; Estlin, Tara A.; Bornstein, Benjamin D.

    2011-01-01

    Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.

  1. Site Study Plan for meteorology/air quality, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Meteorological/Air Quality Site Study Plan describes a field program consisting of continuous measurements of surface (10-meter) wind speed and direction, temperature, humidity, dew point, pressure, and sensible heat flux (vertical). Air quality measurements will be limited to suspended particulate matter. After the first year of measurements, a 60-meter tower will be added to incorporate measurements needed for later modeling and dose calculations; these will include upper level winds, vertical temperature structure, and vertical wind speed. All of these measurements will be made at a site located within the 9-mi 2 site area but remote from the ESF. A second site, located near and downwind from the ESF, will monitor only particulate matter. The SSP describes the need for each study; its design and design rationale; analysis, management, and use of data, schedule of field activities, organization of field personnel and sample management, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from the Salt Repository Project Requirements Document. 38 refs., 8 figs., 3 tabs

  2. Preliminary conceptual study of engineering-scale pyroprocess demonstration facility

    International Nuclear Information System (INIS)

    Moon, Seong-In; Chong, Won-Myung; You, Gil-Sung; Ku, Jeong-Hoe; Kim, Ho-Dong

    2013-01-01

    Highlights: ► The conceptual design of a pyroprocess demonstration facility was performed. ► The design requirements for the pyroprocess hot cell and equipment were determined. ► The maintenance concept for the pyroprocess hot cell was presented. -- Abstract: The development of an effective management technology of spent fuel is important to enhance environmental friendliness, cost viability and proliferation resistance. In Korea, pyroprocess technology has been considered as a fuel cycle option to solve the spent fuel accumulation problems. PRIDE (PyRoprocess Integrated inactive DEmonstration facility) has been developed from 2007 to 2012 in Korea as a cold test facility to support integrated pyroprocessing and an equipment demonstration, which is essential to verify the pyroprocess technology. As the next stage of PRIDE, the design requirements of an engineering-scale demonstration facility are being developed, and the preliminary conceptual design of the facility is being performed for the future. In this paper, the main design requirements for the engineering-scale pyroprocess demonstration facility were studied in the throughput of 10tHM a year. For the preliminary conceptual design of the facility, the design basis of the pyroprocess hot cell was suggested, and the main equipment, main process area, operation area, maintenance area, and so on were arranged in consideration of the effective operation of the hot cells. Also, the argon system was designed to provide and maintain a proper inert environment for the pyroprocess. The preliminary conceptual design data will be used to review the validity of the engineering-scale pyroprocess demonstration facility that enhances both safety and nonproliferation

  3. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  4. Corporate Social Disclosures in Southeast Asia: A Preliminary Study

    Directory of Open Access Journals (Sweden)

    Juniati Gunawan

    2012-12-01

    Full Text Available The issue of Corporate Social Disclosure (CSD has been growing remarkably both in business and academic world.  Inevitably, this topic is also exposed in Southeast Asia, a big region that plays important role in global economic issue. Applying a content analysis method, this paper aims to provide preliminary findings in CSD practices throughout the companies‟ annual reports in 2007 and 2008 for countries located in Southeast Asia.  Samples were selected for listed and unlisted various type of industries, based on the information availability internet searching. The sample collection and the subjectivity during the content analysis process are the limitations in conducting this study. In general, the results show that „human resources‟ are the main information disclosed, while in contrast, „energy‟ is the main least issue disclosed in the annual reports.  However, the findings need to be interpreted with considerations since there are limited in samples. Basically, the outcomes support the major prior studies and enhancing the discussion of CSD conducting in developing countries, while at the same time describing some countries which obtained very limited in exposures. To respond the vast increasing issues of CSD practice, this preliminary study has provided a basis to see the role of every country in CSR reporting and how they could support the sustainability development globally.

  5. Phase B: Final definition and preliminary design study for the initial Atmospheric Cloud Physics Laboratory (ACPL), a spacelab mission payload

    Science.gov (United States)

    1976-01-01

    A preliminary identification of the Supporting Research and Technology (SR&T) necessary during the planned evolution of atmospheric cloud physics is discussed. All requirements are for subsequent flights over its expected ten year lifetime. Those components identified as requiring some SR&T work prior to inclusion are listed. A data sheet is included for each item, briefly justifying the need, giving general objectives for the proposed development effort and identifying approximate schedule requirements on the program.

  6. Preliminary safety analysis of the HTTR-IS nuclear hydrogen production system

    International Nuclear Information System (INIS)

    Sato, Hiroyuki; Ohashi, Hirofumi; Tazawa, Yujiro; Tachibana, Yukio; Sakaba, Nariaki

    2010-06-01

    Japan Atomic Energy Agency is planning to demonstrate hydrogen production by thermochemical water-splitting IS process utilizing heat from the high-temperature gas-cooled reactor HTTR (HTTR-IS system). The previous study identified that the HTTR modification due to the coupling of hydrogen production plant requires an additional safety review since the scenario and quantitative values of the evaluation items would be altered from the original HTTR safety review. Hence, preliminary safety analyses are conducted by using the system analysis code. Calculation results showed that evaluation items such as a coolant pressure, temperatures of heat transfer tubes at the pressure boundary, etc., did not exceed allowable values. Also, the peak fuel temperature did not exceed allowable value and therefore the reactor core was not damaged and cooled sufficiently. This report compiles calculation conditions, event scenarios and the calculation results of the preliminary safety analysis. (author)

  7. Purification, crystallization and preliminary X-ray diffraction studies of parakeet (Psittacula krameri) haemoglobin

    International Nuclear Information System (INIS)

    Jaimohan, S. M.; Naresh, M. D.; Arumugam, V.; Mandal, A. B.

    2009-01-01

    Parakeet (Psittacula krameri) haemoglobin has been purified and crystallized under low salt buffered conditions. Preliminary analysis of the crystal that belonged to monoclinic system (C2) is reported. Birds often show efficient oxygen management in order to meet the special demands of their metabolism. However, the structural studies of avian haemoglobins (Hbs) are inadequate for complete understanding of the mechanism involved. Towards this end, purification, crystallization and preliminary X-ray diffraction studies have been carried out for parakeet Hb. Parakeet Hb was crystallized as the met form in low-salt buffered conditions after extracting haemoglobin from crude blood by microcentrifugation and purifying the sample by column chromatography. Good-quality crystals were grown from 10% PEG 3350 and a crystal diffracted to about 2.8 Å resolution. Preliminary diffraction data showed that the Hb crystal belonged to the monoclinic system (space group C2), with unit-cell parameters a = 110.68, b = 64.27, c = 56.40 Å, β = 109.35°. Matthews volume analysis indicated that the crystals contained a half-tetramer in the asymmetric unit

  8. Fire behaviour - A preliminary study. | W.S.W. | African Journal of ...

    African Journals Online (AJOL)

    Fire behaviour - A preliminary study. ... be taken cognisance of in any future research on fire in relation to vegetation. Keywords: behaviour; botany; environmental conditions; fire; fire behaviour; fire ecology; fires; grass; grasses; management; rate of spread; recovery; south africa; vegetation; veld; veld management; yield ...

  9. Biocontamination Control for Spacesuit Garments - A Preliminary Study

    Science.gov (United States)

    Rhodes, Richard A.; Orndoff, Evelyne; Korona, F. Adam; Poritz, Darwin; Smith, Jelanie; Wong, Wing

    2011-01-01

    This paper outlines a preliminary study that was conducted to review, test, and improve on current space suit biocontamination control. Biocontamination from crew members can cause space suit damage and objectionable odors and lead to crew member health hazards. An understanding of the level of biocontamination is necessary to mitigate its effects. A series of tests were conducted with the intent of evaluating current suit materials, ground and on-orbit disinfectants, and potential commercial off-the-shelf antimicrobial materials. Included in this paper is a discussion of the test methodology, results, and analysis method.

  10. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

  11. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

  12. [PRELIMINARY APPLICATION OF VIRTUAL PREOPERATIVE RECONSTRUCTION PLANNING IN Pilon FRACTURES].

    Science.gov (United States)

    Wang Xiaoping; Wei, Zhantu; Huang, Jian; Chen, Luyao; Hu, Shiqiang; Wu, Weiwei; Tu, Yumin; Guo, Sheng; Xu, Guotai; Deng, Zhicheng

    2016-01-01

    To investigate the application value of three-dimensional reconstruction and virtual preoperative planning for Pilon fractures. Between July 2010 and June 2014, 16 patients with closed Pilon fracture were treated, including 12 males and 4 females with an average age of 36.5 years (range, 22-53 years) and a mean disease duration of 10.2 days (range, 6-14 days). According to AO/Orthopaedic Trauma Association (AO/OTA) typing, 2 cases were rated as 43.B2 type, 3 cases as 43.B3 type, 3 cases as 43.C1 type, 2 cases as 43.C2 type, and 6 cases as 43.C3 type. The preoperative CT data from 16 patients were imported into Mimics10.01 software to establish the detailed fracture three-dimensional digital models. Virtual operation of fracture reduction and implanting internal fixation was performed on the models, and the optional surgical planning was made. Based on the virtual preoperative planning, operations were performed. Established detailed three-dimensional Pilon fracture digital models could perfectly reflect the fracture characteristics, could be observed at any direction, and aided for fracture classification accurately. Virtual fracture operations of reduction, internal fixation and other could be performed to simulate the clinical operation, which could assist the surgeon better preoperative planning in achieving visual presentation and improving the communication. The operation time was 70-130 minutes (mean, 87.8 minutes); intraoperative blood loss volume was 30-150 mL (mean, 71.9 mL). The wounds healed by first intension in all patients. The mean follow-up time was 11.6 months (range, 8-18 months). Postoperative radiological results at 3 groups showed good anatomic reduction according to the Burwell-Charnley criteria, and the fracture healing time was 3-6 months (mean, 3.7 months). There was no complication of internal fixation loosening or breakage during follow-up. The American Orthopedic Foot and Ankle Society (AOFAS) score was 71-100 (mean, 92.3); the results

  13. A Generative Computer Model for Preliminary Design of Mass Housing

    Directory of Open Access Journals (Sweden)

    Ahmet Emre DİNÇER

    2014-05-01

    Full Text Available Today, we live in what we call the “Information Age”, an age in which information technologies are constantly being renewed and developed. Out of this has emerged a new approach called “Computational Design” or “Digital Design”. In addition to significantly influencing all fields of engineering, this approach has come to play a similar role in all stages of the design process in the architectural field. In providing solutions for analytical problems in design such as cost estimate, circulation systems evaluation and environmental effects, which are similar to engineering problems, this approach is being used in the evaluation, representation and presentation of traditionally designed buildings. With developments in software and hardware technology, it has evolved as the studies based on design of architectural products and production implementations with digital tools used for preliminary design stages. This paper presents a digital model which may be used in the preliminary stage of mass housing design with Cellular Automata, one of generative design systems based on computational design approaches. This computational model, developed by scripts of 3Ds Max software, has been implemented on a site plan design of mass housing, floor plan organizations made by user preferences and facade designs. By using the developed computer model, many alternative housing types could be rapidly produced. The interactive design tool of this computational model allows the user to transfer dimensional and functional housing preferences by means of the interface prepared for model. The results of the study are discussed in the light of innovative architectural approaches.

  14. Preliminary nuclear decommissioning cost study

    International Nuclear Information System (INIS)

    Sissingh, R.A.P.

    1981-04-01

    The decommissioning of a nuclear power plant may involve one or more of three possible options: storage with surveillance (SWS), restricted site release (RSR), and unrestricted site use(USU). This preliminary study concentrates on the logistical, technical and cost aspects of decommissioning a multi-unit CANDU generating station using Pickering GS as the reference design. The procedure chosen for evaluation is: i) removal of the fuel and heavy water followed by decontamination prior to placing the station in SWS for thiry years; ii) complete dismantlement to achieve a USU state. The combination of SWS and USU with an interim period of surveillance allows for radioactive decay and hence less occupational exposure in achieving USU. The study excludes the conventional side of the station, assumes waste disposal repositories are available 1600 km away from the station, and uses only presently available technologies. The dismantlement of all systems except the reactor core can be accomplished using Ontario Hydro's current operating, maintenance and construction procedures. The total decommissioning period is spread out over approximately 40 years, with major activities concentrated in the first and last five years. The estimated dose would be approximately 1800 rem. Overall Pickering GS A costs would be $162,000,000 (1980 Canadian dollars)

  15. Implementation Issues for Departure Planning Systems

    Science.gov (United States)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  16. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of shaft liner tests as part of the large shaft development test proposed for the Hanford Site in support of the repository development program. The objectives of these tests are to develop techniques for measuring liner alignment (straightness), both construction assembly alignment and downhole cumulative alignment, and to assess the alignment information as a real time feedback to aid the installation procedure. The test plan is based upon installing a 16 foot ID shaft liner into a 20 foot diameter shaft to a depth of 1000 feet. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs

  17. Application of 3D printing in the surgical planning of hypertrophic obstructive cardiomyopathy and physician-patient communication: a preliminary study.

    Science.gov (United States)

    Guo, Hong-Chang; Wang, Yang; Dai, Jiang; Ren, Chang-Wei; Li, Jin-Hua; Lai, Yong-Qiang

    2018-02-01

    The aim of this study was to evaluate the effect of 3-dimensional (3D) printing in treatment of hypertrophic obstructive cardiomyopathy (HOCM) and its roles in doctor-patient communication. 3D-printed models were constructed preoperatively and postoperatively in seven HOCM patients received surgical treatment. Based on multi-slice computed tomography (CT) images, regions of disorder were segmented using the Mimics 19.0 software (Materialise, Leuven, Belgium). After generating an STL-file (StereoLithography file) with patients' data, the 3D printer (Objet350 Connex3, Stratasys Ltd., USA) created a 3D model. The pre- and post-operative 3D-printed models were used to make the surgical plan preoperatively and evaluate the outcome postoperatively. Meanwhile, a questionnaire was designed for patients and their relatives to learn the effectiveness of the 3D-printed prototypes in the preoperative conversations. The heart anatomies were accurately printed with 3D technology. The 3D-printed prototypes were useful for preoperative evaluation, surgical planning, and practice. Preoperative and postoperative echocardiographic evaluation showed left ventricular outflow tract (LVOT) obstruction was adequately relieved (82.71±31.63 to 14.91±6.89 mmHg, P3D model in preoperative conversations and the communication score was 9.11±0.38 points. A 3D-printed model is a useful tool in individualized planning for myectomies and represent a useful tool for physician-patient communication.

  18. Preliminary study of flotation behavior of Besham Lead-Zinc ore

    International Nuclear Information System (INIS)

    Khan, M.M.; Din, F.; Rafiq, M.

    2001-01-01

    This preliminary study examines the flotation behavior of the mineral galena from Besham Lead-Zinc ore samples with reference to the particle size, collector types such as Ethyl and Propyl xanthates and depressants. The comminution of the as mined ore was carried out in the laboratory jaw crusher and disc mill as well as in a laboratory ball mill. The material having size range between-90 microns and +63 microns was selected for flotation studies. (author)

  19. Site study plan for Deep Hydronest Test Wells, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-05-01

    Wells called Deep Hydronest Wells will be installed at six locations at the Deaf Smith County Site to characterize hydraulic parameters in the geologic column between the top of the San Andres Formation and the base of Pennsylvanian System. Three hydronests will be drilled during early stages of site characterization to provide data for performance assessment modeling. Four wells are proposed for each of these 3 nests. Results of drilling, testing, and preliminary modeling will direct drilling and testing activities at the last 3 nests. Two wells are proposed at each of the last 3 nests for a total of 18 wells. The Salt Repository Project (SRP) Networks specify the schedule under which this program will operate. Drilling and hydrologic testing of the first Deep Hydronest will begin early in the Surface Investigation Program. Drilling and testing of the first three Deep Hydronests will require about 18 months. After 12 months of evaluating and analyzing data from the first three hydronests, the remaining three hydronests will be drilled during a 12-month period. The Technical Field Services Contractor is responsible for conducting the field program. Samples and data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be used to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 36 refs., 20 figs., 6 tabs

  20. 40 CFR 52.1470 - Identification of plan.

    Science.gov (United States)

    2010-07-01

    ...—Inspection and Maintenance (I/M) of Motor Vehicles—Truckee Meadows Planning Area, Nevada;” to Wit: Basic... EPA's preliminary evaluation, specifying documentation for calibrating the model, the mobile source... Chemical Processes)), adopted May 18, 1984). (ii) Additional material. (A) Emissions Inventory for 1995...

  1. TREE STEM RECONSTRUCTION USING VERTICAL FISHEYE IMAGES: A PRELIMINARY STUDY

    Directory of Open Access Journals (Sweden)

    A. Berveglieri

    2016-06-01

    Full Text Available A preliminary study was conducted to assess a tree stem reconstruction technique with panoramic images taken with fisheye lenses. The concept is similar to the Structure from Motion (SfM technique, but the acquisition and data preparation rely on fisheye cameras to generate a vertical image sequence with height variations of the camera station. Each vertical image is rectified to four vertical planes, producing horizontal lateral views. The stems in the lateral view are rectified to the same scale in the image sequence to facilitate image matching. Using bundle adjustment, the stems are reconstructed, enabling later measurement and extraction of several attributes. The 3D reconstruction was performed with the proposed technique and compared with SfM. The preliminary results showed that the stems were correctly reconstructed by using the lateral virtual images generated from the vertical fisheye images and with the advantage of using fewer images and taken from one single station.

  2. A preliminary plant design study for the production of diesel from coal via fischer-tropsch synthesis

    International Nuclear Information System (INIS)

    Kamil, M.; Saleem, M.

    2010-01-01

    Pakistan's reliance on conventional means of producing energy has proven to be an inadequate strategy for overcoming it. The situation direly demands diversification of our energy resources not only to overcome current fiasco but also in planning for future. Among the other alternative sources, coal is the main source for producing cheaper electricity being available as huge reserves. This paper presents the preliminary plant design and cost estimation for the production of diesel from coal via coal gasification and fischer-Tropschs synthesis. Prelimnary design calculations and cost estimation are presented along with underlying assumptions. The results reveal that the diesel produced from this process might be cheaper than the crude oil based diesel. (author)

  3. Payload/orbiter contamination control requirement study: Preliminary contamination mission support plan. [a management analysis of project planning of spacecraft sterilization

    Science.gov (United States)

    Bareiss, L. E.; Hooper, V. W.; Ress, E. B.

    1976-01-01

    Progress is reported on the mission support plan and those support activities envisioned to be applicable and necessary during premission and postmission phases of the Spacelab program. The purpose, role, and requirements of the contamination control operations for the first two missions of the Spacelab equipped Space Transportation System are discussed. The organization of the contamination control operation and its relationship to and interfaces with other mission support functions is also discussed. Some specific areas of contamination to be investigated are treated. They are: (1) windows and viewports, (2) experiment equipment, (3) thermal control surfaces, (4) the contaminant induced atmosphere (as differentiated from the normal ambient atmosphere at the orbit altitude), and (5) optical navigation instruments.

  4. Presentation of preliminary studies relative to the long duration disposal of medium level and long lived (MLLL) wastes

    International Nuclear Information System (INIS)

    Leroy, C.; Moreau, A.; Fayette, L.; Bellon, M.; Templier, J.C.; Macias, R.M.; Porcher, J.B.; Rey, F.; Hollender, F.; Girard, J.P.

    2002-01-01

    In the contract of objectives signed in 2001 with the government, the French atomic energy commission (CEA) committed itself to supply reports of preliminary studies about long duration disposal concepts for medium level and long lived radioactive wastes. This document makes the synthesis of the preliminary studies carried out in 2001 and 2002 by exploring simultaneously the surface and subsurface disposal concepts. The studies deal with the design of a facility with a long service life. Four hypotheses have been retained for the preliminary studies: a secular lifetime (typically 100 to 300 years), a single and new site for all waste packages (no existing facility available), two confinement barriers, an envelope-type site with specific characteristics (seismicity, climate conditions, airplane crash..). These preliminary studies show the existence of solutions for each option: with and without storage containers in both type (surface and subsurface) of facilities. They outline the necessity of studying more thoroughly some technical points. This instruction will be performed for the concepts retained after a multi-criteria analysis. (J.S.)

  5. Readiness to proceed: Characterization planning basis

    International Nuclear Information System (INIS)

    Adams, M.R.

    1998-01-01

    This report summarizes characterization requirements, data availability, and data acquisition plans in support of the Phase 1 Waste Feed Readiness to Proceed Mid-Level Logic. It summarizes characterization requirements for the following program planning documents: Waste Feed Readiness Mid-Level Logic and Decomposition (in development); Master blue print (not available); Tank Waste Remediation System (TWRS) Operations and Utilization Plan and Privatization Contract; Enabling assumptions (not available); Privatization low-activity waste (LAW) Data Quality Objective (DQO); Privatization high-level waste (HLW) DQO (draft); Problem-specific DQOs (in development); Interface control documents (draft). Section 2.0 defines the primary objectives for this report, Section 3.0 discusses the scope and assumptions, and Section 4.0 identifies general characterization needs and analyte-specific characterization needs or potential needs included in program documents and charts. Section 4.0 also shows the analyses that have been conducted, and the archive samples that are available for additional analyses. Section 5.0 discusses current plans for obtaining additional samples and analyses to meet readiness-to-proceed requirements. Section 6.0 summarizes sampling needs based on preliminary requirements and discusses other potential characterization needs. Many requirements documents are preliminary. In many cases, problem-specific DQOs have not been drafted, and only general assumptions about the document contents could be obtained from the authors. As a result, the readiness-to-proceed characterization requirements provided in this document are evolving and may change

  6. Hybrid metaheuristic optimization algorithm for strategic planning of {4D} aircraft trajectories at the continent scale

    OpenAIRE

    Chaimatanan , Supatcha; Delahaye , Daniel; Mongeau , Marcel

    2014-01-01

    International audience; Global air-traffic demand is continuously increasing. To handle such a tremendous traffic volume while maintaining at least the same level of safety, a more efficient strategic trajectory planning is necessary. In this work, we present a strategic trajectory planning methodology which aims to minimize interaction between aircraft at the European-continent scale. In addition, we propose a preliminary study that takes into account uncertainties of aircraft positions in t...

  7. Requirements and feasibility study of flight demonstration of Active Controls Technology (ACT) on the NASA 515 airplane

    Science.gov (United States)

    Gordon, C. K.

    1975-01-01

    A preliminary design study was conducted to evaluate the suitability of the NASA 515 airplane as a flight demonstration vehicle, and to develop plans, schedules, and budget costs for fly-by-wire/active controls technology flight validation in the NASA 515 airplane. The preliminary design and planning were accomplished for two phases of flight validation.

  8. Radiation Testing on State-of-the-Art CMOS: Challenges, Plans, and Preliminary Results

    Science.gov (United States)

    LaBel, Kenneth A.; Cohn, Lewis M.

    2009-01-01

    At GOMAC 2007 and 2008, we discussed a variety of challenges for radiation testing of modern semiconductor devices and technologies [1, 2]. In this presentation, we provide more specific details in this on-going investigation focusing on out-of-the-box lessons observed for providing radiation effects assurances as well as preliminary test results.

  9. Fostering effective studying and study planning with study questions

    NARCIS (Netherlands)

    Wilhelm, P.; Pieters, J.M.

    2007-01-01

    In a course on biological psychology and neuropsychology, study questions were provided that also appeared as test questions in the course exam. This method was introduced to support students in active processing and reproduction of the study texts, and study planning. Data were gathered to test the

  10. VICTORIA Class Submarine Human-in-the-Loop Experimentation Plan

    Science.gov (United States)

    2014-06-01

    1472G. VICTORIA Class Submarine Human-in-the-Loop Experimentation Plan and Preliminary Results © Her Majesty the Queen in Right of...19 th International Command and Control Research and Technology Symposium Title: VICTORIA Class Submarine Human-in-the-Loop...TYPE 3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE VICTORIA Class Submarine Human-in-the-Loop Experimentation Plan 5a. CONTRACT

  11. Tunnel boring waste test plan

    International Nuclear Information System (INIS)

    Patricio, J.G.

    1984-03-01

    The test plan has been prepared in anticipation of the need to excavate certain repository openings by relying upon mechanical excavation techniques. The test plan proposes that specific technical issues can be resolved and key design parameters defined by excavating openings in basalt near the surface, utilizing a full face tunnel boring machine (TBM). The purpose and objective of this type of testing will define the overall feasibility and attributes of mechanical excavation in basalt. The test plan recognizes that although this technology is generally available for underground construction for some geologic settings, the current state of technology for excavation in basalt is limited and the potential for improvement is considerable. The test plan recommends that it is economically advantageous to conduct additional testing in the laboratory to allow refinement of this plan based on the laboratory results. Thus, this test plan is considered preliminary in nature, with respect to detailed testing recommendations. However, the gross design attributes and resource requirements of a near-surface TBM demonstration are considered to be valid. 15 refs., 7 figs., 3 tabs

  12. Preliminary studies in rice-fish culture in a rainfed lowland ecology ...

    African Journals Online (AJOL)

    Mixed farms of rice and fish are yet to receive attention in Ghana, despite lowland rice being grown under inundation in most areas nationwide. In a preliminary study, Nile tilapia (Oreochromis niloticus) was successfully cultured in a rainfed lowland rice farm, although no additional care was provided for fishes. The highest ...

  13. Design principle of TVO's final repository and preliminary adaptation to site specific conditions

    International Nuclear Information System (INIS)

    Salo, J-P.; Reikkola, R.

    1995-01-01

    Teollisuuden Voima Oy (TVO) is responsible for the management of spent fuel produced by the Olkiluoto power plant. TVO's current programme of spent fuel management is based on the guidelines and time schedule set by the Finnish Government. TVO has studied a final disposal concept in which the spent fuel bundles are encapsulated in copper canisters and emplaced in Finnish bedrock. According to the plan the final repository for spent fuel will be in operation by 2020. TVO's updated technical plans for the disposal of spent fuel together with a performance analysis (TVO-92) were submitted to the authorities in 1992. The paper describes the design principle of TVO's final repository and preliminary adaptation of the repository to site specific conditions. (author). 10 refs., 5 figs

  14. DER Certification Laboratory Pilot, Accreditation Plan, and Interconnection Agreement Handbook

    Energy Technology Data Exchange (ETDEWEB)

    Key, T.; Sitzlar, H. E.; Ferraro, R.

    2003-11-01

    This report describes the first steps toward creating the organization, procedures, plans and tools for distributed energy resources (DER) equipment certification, test laboratory accreditation, and interconnection agreements. It covers the activities and accomplishments during the first period of a multiyear effort. It summarizes steps taken to outline a certification plan to assist in the future development of an interim plan for certification and accreditation activities. It also summarizes work toward a draft plan for certification, a beta Web site to support communications and materials, and preliminary draft certification criteria.

  15. Small hydropower station in Lavin - Preliminary study

    International Nuclear Information System (INIS)

    Merz, F.

    2008-05-01

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary study regarding a proposed small hydropower installation on the alpine river Lavinuoz in Lavin, Switzerland. The geographical situation with mountains and glaciers in the catchment area of the proposed hydropower installation is discussed as are the appropriate water catchment installations. Possible dangers caused by avalanches and rock fall are examined. The power to be produced - 5,500,000 kWh/y - by the turbine which is nominally rated at 1350 kW is discussed, as are estimates of production costs. Figures on the investments required and the economic feasibility of the project are discussed, as are environmental factors that are to be taken into account.

  16. Preliminary design study of the TMT Telescope structure system: overview

    Science.gov (United States)

    Usuda, Tomonori; Ezaki, Yutaka; Kawaguchi, Noboru; Nagae, Kazuhiro; Kato, Atsushi; Takaki, Junji; Hirano, Masaki; Hattori, Tomoya; Tabata, Masaki; Horiuchi, Yasushi; Saruta, Yusuke; Sofuku, Satoru; Itoh, Noboru; Oshima, Takeharu; Takanezawa, Takashi; Endo, Makoto; Inatani, Junji; Iye, Masanori; Sadjadpour, Amir; Sirota, Mark; Roberts, Scott; Stepp, Larry

    2014-07-01

    We present an overview of the preliminary design of the Telescope Structure System (STR) of Thirty Meter Telescope (TMT). NAOJ was given responsibility for the TMT STR in early 2012 and engaged Mitsubishi Electric Corporation (MELCO) to take over the preliminary design work. MELCO performed a comprehensive preliminary design study in 2012 and 2013 and the design successfully passed its Preliminary Design Review (PDR) in November 2013 and April 2014. Design optimizations were pursued to better meet the design requirements and improvements were made in the designs of many of the telescope subsystems as follows: 1. 6-legged Top End configuration to support secondary mirror (M2) in order to reduce deformation of the Top End and to keep the same 4% blockage of the full aperture as the previous STR design. 2. "Double Lower Tube" of the elevation (EL) structure to reduce the required stroke of the primary mirror (M1) actuators to compensate the primary mirror cell (M1 Cell) deformation caused during the EL angle change in accordance with the requirements. 3. M1 Segment Handling System (SHS) to be able to make removing and installing 10 Mirror Segment Assemblies per day safely and with ease over M1 area where access of personnel is extremely difficult. This requires semi-automatic sequence operation and a robotic Segment Lifting Fixture (SLF) designed based on the Compliance Control System, developed for controlling industrial robots, with a mechanism to enable precise control within the six degrees of freedom of position control. 4. CO2 snow cleaning system to clean M1 every few weeks that is similar to the mechanical system that has been used at Subaru Telescope. 5. Seismic isolation and restraint systems with respect to safety; the maximum acceleration allowed for M1, M2, tertiary mirror (M3), LGSF, and science instruments in 1,000 year return period earthquakes are defined in the requirements. The Seismic requirements apply to any EL angle, regardless of the

  17. Fostering Effective Studying and Study Planning with Study Questions

    Science.gov (United States)

    Wilhelm, Pascal; Pieters, Jules M.

    2007-01-01

    In a course on biological psychology and neuropsychology, study questions were provided that also appeared as test questions in the course exam. This method was introduced to support students in active processing and reproduction of the study texts, and study planning. Data were gathered to test the hypothesis that study question use would be…

  18. A Preliminary Study on the Effects of Training Using Behavior Support Plan Quality Evaluation Guide (BSP-QE) to Improve Positive Behavioral Support Plans

    Science.gov (United States)

    Wright, Diana Browning; Mayer, G. Roy; Cook, Clayton R.; Crews, S. Dean; Kraemer, Bonnie Rawlings; Gale, Bruce

    2007-01-01

    The purpose of this research was to evaluate the effects of two trainings designed to increase the competencies of professionals to develop high quality positive behavior support plans for students that engage in problem behaviors that interfere with theirs and/or others' ability to learn. Training one consisted of training attendees on six key…

  19. Results and future plans for the innovative basic research on high temperature engineering

    International Nuclear Information System (INIS)

    2001-05-01

    The High Temperature Engineering Test Reactor (HTTR) is under the rise-to-power stage at the Oarai Research Establishment of Japan Atomic Energy Research Institute (JAERI). This reactor is aimed not only at establishment of the infrastructural technology on high temperature gas-cooled reactor and its upgrading, but also at promotion of the innovative basic research on high temperature engineering. The research is a series of innovative high-temperature irradiation studies, making the best use of the characteristic of the HTTR that it provides a very wide irradiation space at high temperatures. The JAERI has been conducting preliminary tests of the innovative research since 1994, in collaboration with universities and other research institutes, in the fields of 1) new materials development, 2) high temperature radiation chemistry and fusion-related research, and 3) high temperature irradiation techniques and other nuclear research. The HTTR Utilization Research Committee has been examining the results and methodology of the preliminary tests and the future plans, as well as examining the preparatory arrangements of facilities for the HTTR irradiation and post-irradiation examinations. This report presents a summary of results of the preliminary tests and preparatory arrangements for about seven years, together with an outline of the future plans. (author)

  20. Evaluation of the probabilistic safety assessment portfolio for NSD. Plan of work

    International Nuclear Information System (INIS)

    Gould, J.

    1999-01-01

    The aim is to use the research portfolio evaluation protocol developed by HSL to evaluate the Probabilistic Safety Assessment (PSA) portfolio, both to draw conclusions about the PSA portfolio and as a pilot study to show the suitability of the evaluation protocol. The objectives of the work are: (1) To collect sufficient information to carry out a preliminary review of the portfolio; (2) o produce a plan of work detailing the time and costs to carry out a full evaluation of the PSA portfolio; (3) to evaluate the PSA portfolio of research; (4) to produce a report of the evaluation of the PSA portfolio; (5) if necessary, to make changes to the methodology in light of the experience gained in the evaluation of the PSA research portfolio. This report completes objectives 1 and 2. It details the plan of work for the evaluation of the PSA research portfolio. The plan has shown that the evaluation of the PSA research portfolio has many difficulties to overcome. It is suitable as a pilot study to show the suitability of the portfolio evaluation protocol and will provide valuable information that can be used to improve it. The evaluation of the PSA portfolio will require a considerable amount of time and effort to complete. The task analysis has shown it to be of the order of Pound Sterling 25k and to take two months to complete after this preliminary data collection. The plan to evaluate the PSA research portfolio detailed in this report should be carried out and the lessons learned by carrying out this pilot study should be used to improve the evaluation protocol

  1. Preliminary rail access study

    International Nuclear Information System (INIS)

    1990-01-01

    The Yucca Mountain site, located on the southwestern edge of the Nevada Test Site, is an undeveloped area under investigation as a potential site for nuclear waste disposal by the US Department of Energy. The site currently lacks rail service and an existing rail right-of-way. If the site is suitable and selected for development as a disposal site, rail service is desirable to the Office of Civilian Radioactive Waste Management Program because of the potential of rail to reduce number of shipments and costs relative to highway transportation. This preliminary report is a summary of progress to date for activities to identify and evaluate potential rail options from major rail carriers in the region to the Yucca Mountain site. It is currently anticipated that the rail spur will be operational after the year 2000. 9 refs., 13 figs., 2 tabs

  2. Preliminary design studies of the draining tanks for the Molten Salt Fast Reactor

    International Nuclear Information System (INIS)

    Merle-Lucotte, E.; Allibert, M.; Heuer, D.; Brovchenko, M.; Laureau, A.; Ghetta, V.; Rubiolo, P.

    2014-01-01

    reactor called the Molten Salt Fast Reactor (MSFR). The reference MSFR design is a 3000 MWth reactor with a total fuel salt volume of 18 m3, operated at a mean fuel temperature of 750 deg. C. The first confinement barrier of the reactor includes a salt draining system. In case of a planned reactor shut down or in case of accidents leading to an excessive increase of the temperature in the fuel circuit, the fuel configuration may be changed passively by gravitational draining of the fuel salt in dedicated draining tank located under the reactor and designed to provide adequate reactivity margins while insuring a passive cooling of the fuel salt to extract the residual heat from the short to the long term. The present preliminary assessment of this sub-critical draining system has been performed to identify the physical constraints and to give some orders of magnitude of characteristic time periods (authors)

  3. Preliminary conceptual studies of REX 2000

    International Nuclear Information System (INIS)

    Merchie, F.; Baas, C.; Ballagny, A.; Chagrot, M.; Farny, G.; Barnier, M.; Pattou, A.

    1993-01-01

    Nuclear R and D programs are, to some extent, completely dependent on research reactors availability. In France and others european countries, the major materials testings reactors were built in the sixties and are consequently ageing and reaching the end of their life, some of them having already been shut down. A situation with not a single large research reactor available in first half of next century cannot be imagined, given all the benefits drawn from the use of research reactors. The CEA has therefore started to evaluate the needs for neutron sources in the next four or five decades so as to design the most suitable new facilities to take over from the existing ones. REX 2000 is a new dedicated reactor project intended to meet the needs for fuels and materials testings after the year 2000. The preliminary conceptual studies which have been carried out along the last 18 months are presented and commented. (author)

  4. Strategic planning in hospitals in two Australian states: an exploratory study of its practice using planning documentation.

    Science.gov (United States)

    Jayasuriya, R; Sim, A B

    1998-01-01

    Hospitals are under pressure to respond to new challenges and competition. Many hospitals have used strategic planning to respond to these environmental changes. This exploratory study examines the extent of strategic planning in hospitals in two Australian States, New South Wales and Victoria, using a sample survey. Based on planning documentation, the study indicated that 47% of the hospitals surveyed did not have a strategic or business plan. A significant difference was found in the comprehensiveness of the plans between the two States. Plans from Victorian hospitals had more documented evidence of external/internal analysis, competitor orientation and customer orientation compared with plans from New South Wales hospitals. The paper discusses the limitations of the study and directions for future research.

  5. Post-Occupancy Evaluation Data Support for Planning and Management of Building Maintenance Plans

    Directory of Open Access Journals (Sweden)

    Nelson Bento Pereira

    2016-10-01

    Full Text Available The purpose of this paper is to propose a post-occupancy evaluation (POE method focused on building maintenance and then to test it on two different sets of residential buildings. The paper’s three main goals are: to obtain useful data for optimizing the buildings’ maintenance plans; to search for any correlation between the occupants’ characteristics and their expectations toward the building; to study the occupants’ willingness to pay for maintenance procedures, as well as its correlation with the occupants’ perception of the elements source of maintenance (ESM. The proposed POE method for building maintenance performance evaluation (BMPE consists of six main stages, focusing on the occupants’ opinions and their correlation with the facility manager’s. The observed case studies allowed for a preliminary validation of the POE method for BMPE. Results generically endorsed the method as a valuable tool for the rapprochement between facility management and the building’s end-users. Such findings could allow facility managers to develop more efficient maintenance plans focusing on the occupants’ real needs and expectations, raising occupant satisfaction levels and contributing to the building’s general performance.

  6. Criteria for safety-related nuclear plant operator actions: a preliminary assessment of available data

    International Nuclear Information System (INIS)

    Haas, P.M.; Bott, T.F.

    1980-01-01

    In the US, an effort has been underway for a number of years to develop a design standard to define when required manual operator action can be accepted as part of a nuclear plant design basis. Insufficient data are available to provide quantitative guidelines for the standard. To provide the necessary data base to support such standards and the necessary quantitative assessment of operator reliability, the US Nuclear Regulatory Commission is sponsoring a study at Oak National Laboratory to develop the data base. A preliminary assessment completed in April, 1979 concluded that sufficient data from US operating experience did not exist to provide an adequate data base. A program of research using full-scope nuclear plant simulators and results that are correlated to field data was suggested. That program was recently initiated. The approach, results and conclusions of the preliminary assessment are reviewed and the planned research program of simulator studies is summarised. (author)

  7. [Efficiency of computer-based documentation in long-term care--preliminary project].

    Science.gov (United States)

    Lüngen, Markus; Gerber, Andreas; Rupprecht, Christoph; Lauterbach, Karl W

    2008-06-01

    In Germany the documentation of processes in long-term care is mainly paper-based. Planning, realization and evaluation are not supported in an optimal way. In a preliminary study we evaluated the consequences of the introduction of a computer-based documentation system using handheld devices. We interviewed 16 persons before and after introducing the computer-based documentation and assessed costs for the documentation process and administration. The results show that reducing costs is likely. The job satisfaction of the personnel increased, more time could be spent for caring for the residents. We suggest further research to reach conclusive results.

  8. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  9. An overview of industrial and organisational psychology research in South Africa: A preliminary study

    Directory of Open Access Journals (Sweden)

    Dries Schreuder

    2010-10-01

    Research purpose: The purpose of this study was to explore general research trends in the field of industrial and organisational psychology in South Africa from 1950 to 2008. Motivation for study: Research in the field tends to be influenced by either the changing needs of business or the occupational or personal fields of interest of academics, which often lead to an overemphasis on specific subdisciplines at the expense of others. This research aims to critically review dominant trends in the research focus areas in the field, in the light of present challenges in the changing work context. Recommendations are also made for possible future research. Research design, approach and method: A broad systematic review was carried out to analyse documented published and accredited South African research in the field (n = 2501. Main findings: Although there has been a proportional decline in personnel psychology research since 1990, there has been a proportional increase in both organisational psychology and employee wellness research since 1980 and 1990, respectively. Some areas of the industrial and organisational psychology field appear to be consistently under-researched. Practical implications: The insights derived from the findings can be used by academia and researchers in the field to plan future research initiatives. Contribution/value-add: The findings provide preliminary insights that contribute to the body of knowledge concerned with the industrial and organisational psychology field in the South African context.

  10. Study plan for research on long-term stability of geological environments in FY2009

    International Nuclear Information System (INIS)

    Yasue, Ken-ichi; Hanamuro, Takahiro; Kokubu, Yoko; Ishimaru, Tsuneari; Umeda, Koji

    2009-09-01

    The Japanese islands lie in a region of the Circum-Pacific orogenic belt characterized by active tectonics such as volcanism and earthquakes. The concept of geological disposal of HLW in Japan is based on a multi-barrier system which consists of the engineered barrier in the stable geological environments and the natural barrier. The natural phenomena which potentially affect the geological environments in tectonically active Japan are volcanism, faulting, uplift, denudation, climatic change, and sea-level change. Investigation technologies to evaluate their long-term stability of the geological environments have been developed. In fiscal year 2009, we continue researches to develop technologies for detecting latent geotectonic events in preliminary investigation. With regard to modelling technology, we plan to develop prediction models for evaluating the changes of geological environment (e.g., thermal, hydraulic, mechanical, and geochemical conditions) for long term. In addition to these, the development of dating techniques prerequisite for these studies is also carried out. (author)

  11. The prevalence of asthma work relatedness: Preliminary data

    Directory of Open Access Journals (Sweden)

    Wojciech Dudek

    2015-12-01

    Full Text Available Objectives: About 5–10% of asthmatics do not respond well to standard treatment plan. Occupational exposure may be one of the factors that can be linked with treatment failure. The aim of the study was to assess the prevalence of work-related asthma (WRA among adult asthmatics under follow up in an outpatient allergy clinic and to create a useful tool for detecting individuals with possible WRA. Material and Methods: Preliminary 5-question questionnaire designed to recognize WRA was presented to 300 asthmatics. All patients with positive preliminary verification along with 50 subjects from control group were asked to fill up a detailed questionnaire. The WRA was diagnosed by positive match for asthma symptoms in combination with workplace exposure indicated in the detailed WRA questionnaire followed by confirmation of each WRA case by detailed exposure analysis. Results: Work-related asthma was recognized in 63 subjects (21% of study group. The preliminary questionnaire has 76.9% sensitivity and 94% specificity in recognition of WRA. Occupational exposure to irritants is a risk factor of WRA recognition (relative risk (RR = 2.09 (1.44:3.03. Working in exposure-free environment is a factor against WRA recognition (RR = 0.38 (0.24:0.61. Among subjects with work-related asthma, the uncontrolled course of the disease is significantly more frequent (p = 0.012. Subjects with WRA more often report sickness absenteeism due to asthma than those without WRA (9.6% vs. 3.2%, respectively, but the observed differences did not reach the statistical significance. Conclusions: Short 5-question questionnaire seems to be a promising tool to detect individuals with possible work-related asthma in the outpatient setting for further evaluation and additional attention.

  12. Nuclear research reactor IEA-R1 heat exchanger inlet nozzle flow - a preliminary study

    International Nuclear Information System (INIS)

    Angelo, Gabriel; Andrade, Delvonei Alves de; Fainer, Gerson; Angelo, Edvaldo

    2009-01-01

    As a computational fluid mechanics training task, a preliminary model was developed. ANSYS-CFX R code was used in order to study the flow at the inlet nozzle of the heat exchanger of the primary circuit of the nuclear research reactor IEA-R1. The geometry of the inlet nozzle is basically compounded by a cylinder and two radial rings which are welded on the shell. When doing so there is an offset between the holes through the shell and the inlet nozzle. Since it is not standardized by TEMA, the inlet nozzle was chosen for a preliminary study of the flow. Results for the proposed model are presented and discussed. (author)

  13. A preliminary comparative treatment planning study for radiotherapy of age-related maculopathy

    International Nuclear Information System (INIS)

    Mazal, A.; Schwartz, L.; Lacroix, F.; Mammar, H.; Delacroix, S.; Ferrand, R.; Nauraye, C.; Desjardins, L.; Schlienger, P.; D'Hermies, F.; Frau, E.; Habrand, J.-L.; Rosenwald, J.-C.

    1998-01-01

    Purpose: We present a comparative planning of different approaches for external radiotherapy in age-related maculopathies. Materials and methods: Calculated dose distributions and dose-volume histograms for (a) bilateral irradiation with 6 MV photons, (b) a single lateral-oblique beam using either photons, electrons or protons and (c) an anterior circular proton beam. Results: For lateral photon or electron beams the dose to the lens is usually lower than 10% of the dose to the macula. The entrance doses for bilateral photon beams are about 50% which increase up to 100% at the orbital bone. About 5 mm of optic nerves are irradiated at the maximal dose while the optic chiasma is spared. A single photon beam gives 50% of the dose to the fellow eye. The electron beam spares the fellow eye but gives a rather inhomogeneous dose to the target volume. For a lateral proton beam, 4 mm of optic nerve receives 90% of the dose, the skin dose is at least 70% of the dose to the macula and the lens and the fellow eye are spared. An anterior proton beam gives 90% of the dose to 1 mm of optic nerve and the 50% isodose approaches the periphery of the lens. Conclusion: Doses to the critical structures can be dramatically diminished for all the techniques by reducing the beam size, but only if very precise set-up techniques are used. Proton beams are an attractive solution, but the impact of such a choice on the use of proton facilities and on the national health system should be carefully evaluated, as well as the risk of radio-induced secondary neoplasias. (Copyright (c) 1998 Elsevier Science B.V., Amsterdam. All rights reserved.)

  14. Two preliminary studies on sleep and psychotherapy.

    Science.gov (United States)

    Karle, W; Hopper, M; Corriere, R; Hart, J; Switzer, A

    1977-09-01

    Two preliminary studies were conducted to assess the effects of an intensive outpatient psychotherapy, Feeling Therapy, on sleep. This therapy was chosen because of its demonstrated ability to affect its patients' dreams. In the first study a newly entering female patient was recorded across the first three weeks of intensive daily therapy. In contrast to two control subjects recorded across a similar time period, she demonstrated low REM times and short REM latencies on the average, and considerably greater variability in nearly every parameter. In the second study, two patients were recorded across three days (the middle of which was the day of a therapy session) first when new in therapy and then again after two and one-half years of therapy. It was found that when new in therapy both subjects spent nights of significantly altered sleep the day of the therapy session. One subject showed no REM sleep whatsoever while the other showed a 10 min REM latency and low REM time. The significance of these findings and the direction of future research is discussed.

  15. Occupational Therapy in the Context of Head Start: A Preliminary Survey Study

    Science.gov (United States)

    Bowyer, Patricia; Moore, Cary C.; Thom, Carly

    2016-01-01

    This preliminary, descriptive study yields information on the utilization of occupational therapy services within Head Start programs. Participants completed an Internet-based survey of 25 questions pertaining to the understanding, scope, and utilization of occupational therapy services. Surveys were completed by 35 respondents nationwide. A total…

  16. Optimization process planning using hybrid genetic algorithm and intelligent search for job shop machining.

    Science.gov (United States)

    Salehi, Mojtaba; Bahreininejad, Ardeshir

    2011-08-01

    Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously.

  17. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    International Nuclear Information System (INIS)

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-01-01

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (∼2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ∼2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the

  18. Reliability planning in distributed electric energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.

    1978-10-01

    The goal of this paper is to develop tools for technology evaluation that address questions involving the economics of large-scale systems. The kind of cost discussed usually involves some dynamic aspect of the energy system. In particular, such properties as flexibility, stability, and resilience are features of entire systems. Special attention must be paid to the question of reliability, i.e., availability on demand. The storage problem and the planning for reliability in utility systems are the subjects of this paper. The introductory chapter addresses preliminary definitions--reliability planning, uncertainty, resilience, and other sensitivities. The study focuses on the contrast between conventional power generation technologies with controllable output and intermittent resources such as wind and solar electric conversion devices. The system studied is a stylized representation of California conditions. Significant differences were found in reliability planning requirements (and therefore costs) for systems dominated by central station plants as opposed to those dominated by intermittent resource technologies. It is argued that existing hydroelectric facilities need re-optimization. These plants provide the only currently existing bulk power storage in electric energy systems. 38 references. (MCW)

  19. Preliminary Cost Model for Space Telescopes

    Science.gov (United States)

    Stahl, H. Philip; Prince, F. Andrew; Smart, Christian; Stephens, Kyle; Henrichs, Todd

    2009-01-01

    Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. However, great care is required. Some space telescope cost models, such as those based only on mass, lack sufficient detail to support such analysis and may lead to inaccurate conclusions. Similarly, using ground based telescope models which include the dome cost will also lead to inaccurate conclusions. This paper reviews current and historical models. Then, based on data from 22 different NASA space telescopes, this paper tests those models and presents preliminary analysis of single and multi-variable space telescope cost models.

  20. Forward-Looking Planning of Technology Development

    Directory of Open Access Journals (Sweden)

    Katarzyna Halicka

    2015-12-01

    Full Text Available The main aim of this article is to adapt the Future-Oriented Technology Analysis (FTA to prospective planning of technology development. Firstly, the article presents the assumptions, methods and idea, as well as the concept of the FTA method. Moreover, selected publications on the use of this method were analysed. Then, an original, base model of forward-looking planning of technology development was constructed and presented. The end result of this process will be the development of the localized in time, presented in graphic form, action plan referred to as the route of technology development. Basing on the literature review and the research projects a preliminary route of development of arbitrarily chosen technology was also built and presented.

  1. ICT and UD: Preliminary Study for Recommendations to Design Accessible University Courses.

    Science.gov (United States)

    Pagliara, Silvio Marcello; Sánchez Utgé, Marta; De Anna, Lucia

    2017-01-01

    Starting from the Universal Design in the educational context principles, the experiences gained during the FIRB project "Net@ccessibility" and the high-education courses for teachers' specialization on special education, this research will focus on preliminary studies in order to define the recommendations for designing accessible university courses.

  2. Preliminary studies of soil erosion in a valley bottom in Ibadan under ...

    African Journals Online (AJOL)

    Preliminary studies of soil erosion in a valley bottom in Ibadan under some tillage practices. EA Aiyelari, SO Oshunsanya. Abstract. No Abstract. Global Journal of Agricultural Sciences Vol. 7 (1) 2008: pp.221-228. Full Text: EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT ...

  3. Strategic considerations in planning a counterevacuation

    International Nuclear Information System (INIS)

    Chester, C.V.; Cristy, G.A.; Haaland, C.M.

    1975-12-01

    The Soviet Union has highly developed plans to evacuate their population centers in a nuclear confrontation. Their plans include construction of expedient shelters in the outlying areas and continued operation of their essential industry by commuting workers. If they should successfully implement their plan, a subsequent nuclear exchange with the United States would cost them far fewer casualties than they suffered in World War II. Without a corresponding evacuation, the US could lose from 50 to 70 percent of its population. This asymmetry in vulnerability, if allowed to persist, would seriously weaken the bargaining position of the US President. To restore the balance, a great reduction in vulnerability can be achieved most economically by planning a US counterevacuation as a response to a Soviet evacuation. Russian historical experience with murderous invaders, most recently in World War II, has made authoritarian defense measures involving civilians and property in peacetime quite acceptable in their culture. In the US, widescale use of private property and civilian participation in defense activity are not feasible until the development of a grave crisis. Hence US evacuation plans must differ in several important respects from the Soviet plans. However, this preliminary study indicates that the US has ample material resources to move and shelter its population at least as effectively as the Soviet Union. Perhaps the most critical disadvantage of the US is in morale, as evidenced by the widespread misconception that effective survival measures are not possible

  4. Preliminary sensitivity analyses of corrosion models for BWIP [Basalt Waste Isolation Project] container materials

    International Nuclear Information System (INIS)

    Anantatmula, R.P.

    1984-01-01

    A preliminary sensitivity analysis was performed for the corrosion models developed for Basalt Waste Isolation Project container materials. The models describe corrosion behavior of the candidate container materials (low carbon steel and Fe9Cr1Mo), in various environments that are expected in the vicinity of the waste package, by separate equations. The present sensitivity analysis yields an uncertainty in total uniform corrosion on the basis of assumed uncertainties in the parameters comprising the corrosion equations. Based on the sample scenario and the preliminary corrosion models, the uncertainty in total uniform corrosion of low carbon steel and Fe9Cr1Mo for the 1000 yr containment period are 20% and 15%, respectively. For containment periods ≥ 1000 yr, the uncertainty in corrosion during the post-closure aqueous periods controls the uncertainty in total uniform corrosion for both low carbon steel and Fe9Cr1Mo. The key parameters controlling the corrosion behavior of candidate container materials are temperature, radiation, groundwater species, etc. Tests are planned in the Basalt Waste Isolation Project containment materials test program to determine in detail the sensitivity of corrosion to these parameters. We also plan to expand the sensitivity analysis to include sensitivity coefficients and other parameters in future studies. 6 refs., 3 figs., 9 tabs

  5. Proton Therapy for Spinal Ependymomas: Planning, Acute Toxicities, and Preliminary Outcomes

    Energy Technology Data Exchange (ETDEWEB)

    Amsbaugh, Mark J. [Division of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, TX (United States); Grosshans, David R., E-mail: dgrossha@mdanderson.org [Division of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, TX (United States); McAleer, Mary Frances; Zhu, Ron; Wages, Cody; Crawford, Cody N.; Palmer, Matthew; De Gracia, Beth; Woo Shiao; Mahajan, Anita [Division of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, TX (United States)

    2012-08-01

    Purpose: To report acute toxicities and preliminary outcomes for pediatric patients with ependymomas of the spine treated with proton beam therapy at the MD Anderson Cancer Center. Methods and Materials: Eight pediatric patients received proton beam irradiation between October 2006 and September 2010 for spinal ependymomas. Toxicity data were collected weekly during radiation therapy and all follow-up visits. Toxicities were graded according to the Common Terminology Criteria for Adverse Events version 3.0. Results: All patients had surgical resection of the tumor before irradiation (7 subtotal resection and 1 gross total resection). Six patients had World Health Organization Grade I ependymomas, and two had World Health Organization Grade II ependymomas. Patients had up to 3 surgical interventions before radiation therapy (range, 1-3; median, 1). Three patients received proton therapy after recurrence and five as part of their primary management. The entire vertebral body was treated in all but 2 patients. The mean radiation dose was 51.1 cobalt gray equivalents (range, 45 to 54 cobalt gray equivalents). With a mean follow-up of 26 months from the radiation therapy start date (range, 7-51 months), local control, event-free survival, and overall survival rates were all 100%. The most common toxicities during treatment were Grade 1 or 2 erythema (75%) and Grade 1 fatigue (38%). No patients had a Grade 3 or higher adverse event. Proton therapy dramatically reduced dose to all normal tissues anterior to the vertebral bodies in comparison to photon therapy. Conclusion: Preliminary outcomes show the expected control rates with favorable acute toxicity profiles. Proton beam therapy offers a powerful treatment option in the pediatric population, where adverse events related to radiation exposure are of concern. Extended follow-up will be required to assess for late recurrences and long-term adverse effects.

  6. Tanjung Enim IV coal exploration project. Volume III. Preliminary mining plan for South Arahan area

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Based on the results of the survey carried out at Tanjung Enim in South Sumatra, a mining plan in the South Arahan area was studied. The plan was studied with geological structure, coal quality and social basement facilities as restriction conditions, with the mining amount, selling price and land transportation expenses as fluctuation factors, and using the optimum mining area determination method (pit optimizer), etc. The results of the survey were classified into the following 11 items: 1) assumptions; 2) pit optimization; 3) pit design; 4) long term scheduling; 5) detailed scheduling; 6) waste dumping; 7) mining equipment model case simulation; 8) mine facilities; 9) mine economics; 10) investigation of coal transportation; 11) conclusion. In 1), study was made on geological modeling, coal quality data and mining economics. (NEDO)

  7. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  8. 76 FR 32133 - FAR Council's Plan for Retrospective Review Under Executive Order 13563-Preliminary Plan

    Science.gov (United States)

    2011-06-03

    ... business subcontracting plans; 7. Restructuring rules addressing conflicts of interest; and 8. Clarifying... regulatory objectives.'' To comply with E.O. 13563, the FAR Council invites interested members of the public....regulations.gov , including any personal and/or business confidential information provided. FOR FURTHER...

  9. Preliminary concepts for materials measurement and accounting in critical facilities

    International Nuclear Information System (INIS)

    Cobb, D.D.; Sapir, J.L.

    1978-01-01

    Preliminary concepts are presented for improved materials measurement and accounting in large critical facilities. These concepts will be developed as part of a study that will emphasize international safeguarding of critical facilities. The major safeguards problem is the timely verification of in-reactor inventory during periods of reactor operation. This will require a combination of measurement, statistical sampling, and data analysis techniques. Promising techniques include integral measurements of reactivity and other reactor parameters that are sensitive to the total fissile inventory, and nondestructive assay measurements of the fissile material in reactor fuel drawers and vault storage canisters coupled with statistical sampling plans tailored for the specific application. The effectiveness of proposed measurement and accounting strategies will be evaluated during the study

  10. Egypt--United States cooperative energy assessment: report on preliminary discussions

    Energy Technology Data Exchange (ETDEWEB)

    1978-04-01

    Egyptian and U.S. Government representatives met in Cairo during the period of February 14-22, 1978 to discuss a cooperative Egypt-U.S. assessment of the energy demand and supply options available to Egypt. This report summarizes those preliminary discussions. The discussions accomplished the following: the background and objectives of the U.S. initiative for a cooperative energy assessment with Egypt were explained; Egyptian electric energy activities and their priorities were presented; methods under consideration for the systematic identification and assessment of energy options available to Egypt were explained; the cooperation of Egyptian energy resource and planning organizations was assured; and arrangements to carry out the cooperative assessment were planned.

  11. Effective Business Planning : Case Study: Company X

    OpenAIRE

    Yakovleva, Yulia

    2017-01-01

    A business planning process plays one of the most important roles in a company. A business plan can either provide stablility and prosperity to a company or drastically worsen its state. Thus, the recommendations for efficient business plans are very useful for companies that have some difficulties with their perfomance. The thesis has a deductive approach, and the qualitative research method was chosen as primary data was collected through desk study and interviews. The secondary data wa...

  12. A case study of strategic planning IFB

    Directory of Open Access Journals (Sweden)

    Pedro Henrique Rodrigues de Camargo Dias

    2018-03-01

    Full Text Available The purpose of this article is to identify and characterize the initial stage of the IFB strategic planning, based on the perception of top management and planning team. The case study adopts a qualitative approach supported by bibliographic research techniques, to build a theoretical foundation, allied to the semistructure interview for later, application of the content analysis. As a result, we can identify that the institution opted to first define the strategic references, based on the construction of the mission, vision and values, and later, analysis of the organizational diagnosis, based on the Balanced Scorecard methodology. It was verified that the tool of strategic planning and its use are points that need to be better understood by the managers and technical planning team. The predominant characteristics of strategic planning are composed of a programmatic tool for projecting medium and long term goals and actions, of legal compliance, as it integrates and operationalizes the Institutional Development Plan (PDI.

  13. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  14. Planning the Decommissioning of Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Podlaha, J., E-mail: pod@ujv.cz [Nuclear Research Institute Rez, 25068 Rez (Czech Republic)

    2013-08-15

    In the Czech Republic, three research nuclear reactors are in operation. According to the valid legislation, preliminary decommissioning plans have been prepared for all research reactors in the Czech Republic. The decommissioning plans shall be updated at least every 5 years. Decommissioning funds have been established and financial resources are regularly deposited. Current situation in planning of decommissioning of research reactors in the Czech Republic, especially planning of decommissioning of the LVR-15 research reactor is described in this paper. There appeared new circumstances having wide impact on the decommissioning planning of the LVR-15 research reactor: (1) Shipment of spent fuel to the Russian Federation for reprocessing and (2) preparation of processing of radioactive waste from reconstruction of the VVR-S research reactor (now LVR-15 research reactor). The experience from spent fuel shipment to the Russian Federation and from the process of radiological characterization and processing of radioactive waste from reconstruction of the VVR-S research reactor (now the LVR-15 research reactor) and the impact on the decommissioning planning is described in this paper. (author)

  15. Potential of ricehull communal power generation in the Philippines - a preliminary study

    International Nuclear Information System (INIS)

    Bernardo, J.Y.; Navarro, L.B.; Abito, G.F.; Lim, B.P.

    1992-01-01

    The preliminary feasibility study of utilizing ricehulls as fuel for power generation in a communal set-up involving ricemills was completed by PNOC-ERDC for the EC-AIT COGEN Programme. The study assessed the market, evaluated the patterns and level of ricehull availability, and their implications on plant operation characteristics and financial viability. Ten potential areas were studied more closely for their suitability as pilot demonstration sites. (auth.). 8 tabs.; 4 figs.; 1 ref

  16. Preliminary Shielding Analysis for HCCB TBM Transport

    Science.gov (United States)

    Miao, Peng; Zhao, Fengchao; Cao, Qixiang; Zhang, Guoshu; Feng, Kaiming

    2015-09-01

    A preliminary shielding analysis on the transport of the Chinese helium cooled ceramic breeder test blanket module (HCCB TBM) from France back to China after being irradiated in ITER is presented in this contribution. Emphasis was placed on irradiation safety during transport. The dose rate calculated by MCNP/4C for the conceptual package design satisfies the relevant dose limits from IAEA that the dose rate 3 m away from the surface of the package containing low specific activity III materials should be less than 10 mSv/h. The change with location and the time evolution of dose rates after shutdown have also been studied. This will be helpful for devising the detailed transport plan of HCCB TBM back to China in the near future. supported by the Major State Basic Research Development Program of China (973 Program) (No. 2013GB108000)

  17. Preliminary study on AC superconducting machines

    International Nuclear Information System (INIS)

    Yamamoto, M.; Ishigohka, T.; Shimohka, T.; Mizukami, N.; Yamaguchi, M.

    1988-01-01

    This paper describes the issues involved in developing AC superconducting machines. In the first phase, as a preliminary experiment, a 4kVa AC superconducting coil which employs 100A class 50/60Hz superconductors is made and tested. And, in the second phase, as an extension of the 4kVa coil, a model superconducting transformer is made and examined. The transformer has a novel quench protection system with an auxiliary coil only in the low voltage side. The behavior of the overcurrent protection system is confirmed

  18. A preliminary study on electromyographic analysis of the paraspinal musculature in idiopathic scoliosis

    NARCIS (Netherlands)

    Cheung, J.; Halbertsma, J.P.; Veldhuizen, A.G.; Sluiter, W.J.; Maurits, N.M.; Cool, J.C.; van Horn, J.R.

    The paraspinal muscles have been implicated as a major causative factor in the progression of idiopathic scoliosis. Therefore, the objectives of this preliminary study were to measure the electromyographic activity (EMG) of the paraspinal muscles to determine its relationship to progression of the

  19. The Effect of Teacher Training on the Knowledge of Positive Behavior Support and the Quality of Behavior Intervention Plans: A Preliminary Study in Taiwan

    Science.gov (United States)

    Wu, Pei-Fang

    2017-01-01

    The purpose of this study was to investigate whether through a series of teacher training. The participants could acquire better knowledge on Positive Behavior Support (PBS), and develop high quality behavior intervention plans. Thirty-six teachers from three public schools participated in the study. The competency-based training consisted of 12…

  20. A case study of IMRT planning (Plan B) subsequent to a previously treated IMRT plan (Plan A)

    International Nuclear Information System (INIS)

    2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" data-affiliation=" (Department of Medical Physics and 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" >Cao, F; 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" data-affiliation=" (Department of Medical Physics and 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" >Leong, C; 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" data-affiliation=" (Department of Medical Physics and 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" >Schroeder, J; 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" data-affiliation=" (Department of Medical Physics and 2Department of Radiation Oncology, Fraser Valley Centre, BC Cancer Agency, Surrey, British Columbia (Canada))" >Lee, B

    2014-01-01

    Background and purpose: Treatment of the contralateral neck after previous ipsilateral intensity modulated radiation therapy (IMRT) for head and neck cancer is a challenging problem. We have developed a technique that limits the cumulative dose to the spinal cord and brainstem while maximizing coverage of a planning target volume (PTV) in the contralateral neck. Our case involves a patient with right tonsil carcinoma who was given ipsilateral IMRT with 70Gy in 35 fractions (Plan A). A left neck recurrence was detected 14 months later. The patient underwent a neck dissection followed by postoperative left neck radiation to a dose of 66 Gy in 33 fractions (Plan B). Materials and Methods: The spinal cord-brainstem margin (SCBM) was defined as the spinal cord and brainstem with a 1.0 cm margin. Plan A was recalculated on the postoperative CT scan but the fluence outside of SCBM was deleted. A further modification of Plan A resulted in a base plan that was summed with Plan B to evaluate the cumulative dose received by the spinal cord and brainstem. Plan B alone was used to evaluate for coverage of the contralateral neck PTV. Results: The maximum cumulative doses to the spinal cord with 0.5cm margin and brainstem with 0.5cm margin were 51.96 Gy and 45.60 Gy respectively. For Plan B, 100% of the prescribed dose covered 95% of PTVb1. Conclusion: The use of a modified ipsilateral IMRT plan as a base plan is an effective way to limit the cumulative dose to the spinal cord and brainstem while enabling coverage of a PTV in the contralateral neck.

  1. Thermal treatment of recycled concrete aggegate for general use in concrete. A preliminary study

    NARCIS (Netherlands)

    Larbi, J.A.; Heijnen, W.M.M.; Brouwer, J.P.; Mulder, E.

    2000-01-01

    In this paper, the results of a preliminary laboratory study to assess the effectiveness of thermally treating recycled concrete aggregate for genera) use in concrete are presented. The samples used for the study consisted of sieved fractions of crushed concrete that were subjected to various

  2. Program Plan: field radionuclide migration studies in Climax granite

    International Nuclear Information System (INIS)

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-01-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document

  3. Purification, crystallization and preliminary X-ray diffraction studies of parakeet (Psittacula krameri) haemoglobin.

    Science.gov (United States)

    Jaimohan, S M; Naresh, M D; Arumugam, V; Mandal, A B

    2009-10-01

    Birds often show efficient oxygen management in order to meet the special demands of their metabolism. However, the structural studies of avian haemoglobins (Hbs) are inadequate for complete understanding of the mechanism involved. Towards this end, purification, crystallization and preliminary X-ray diffraction studies have been carried out for parakeet Hb. Parakeet Hb was crystallized as the met form in low-salt buffered conditions after extracting haemoglobin from crude blood by microcentrifugation and purifying the sample by column chromatography. Good-quality crystals were grown from 10% PEG 3350 and a crystal diffracted to about 2.8 A resolution. Preliminary diffraction data showed that the Hb crystal belonged to the monoclinic system (space group C2), with unit-cell parameters a = 110.68, b = 64.27, c = 56.40 A, beta = 109.35 degrees . Matthews volume analysis indicated that the crystals contained a half-tetramer in the asymmetric unit.

  4. Development of polygonal surface version of ICRP reference phantoms: Preliminary study for posture change

    International Nuclear Information System (INIS)

    Nguyen, Tat Thang; Yeom, Yeon Soo; Han, Min Cheol; Kim, Chan Hyeong

    2013-01-01

    Even though International Commission on Radiological Protection (ICRP) officially adopted a set of adult male and female voxel phantoms as the ICRP reference phantoms, there are several critical limitations due to the nature of voxel geometry and their low voxel resolutions. In order to overcome these limitations of the ICRP phantoms, we are currently developing polygonal surface version of ICRP reference phantoms by directly converting the ICRP voxel phantoms to polygonal surface geometries. Among the many advantages of the ICRP polygonal surface phantom, especially, it is flexible and deformable. In principle, it is, therefore, possible to make the posture-changed ICRP phantoms which can provide more accurate dose values for exposure situations strongly relevant to worker's postures. As a preliminary study for developing the posture-changed ICRP phantoms, in this work we changed the posture of the preliminary version of ICRP male polygon-surface phantom constructed in the previous study. Organ doses were then compared between original and posture-changed phantoms. In the present study, we successfully changed a posture of the preliminary version of ICRP male polygon-surface phantom to the walking posture. From this results, it was explicitly shown that the polygon-surface version of the ICRP phantoms can be sufficiently modified to be various postures with the posture-changing method used in this study. In addition, it was demonstrated that phantom's posture must be considered in certain exposure situations, which can differ dose values from the conventional standing-posture phantom

  5. Studi Faktor-faktor Pemotivasi Manajemen Melakukan Tax Planning

    OpenAIRE

    Indrawati Indrawati; Gideon Setyo Budiwitaksono

    2015-01-01

    The purpose of this study is to examine the influence of Tax Policy, Tax Law, and Tax Administration on Tax Planning. Our samples consist of 20 Tax Cosultant’s Clients in Surabaya.The Results of this study show that tax policy and tax administration is not a factor that can motivate management to perform tax planning. While the tax laws is a factor that can motivate management to perform tax planning. This research suggests to the Government to issue tax regulations clearly and unambigu...

  6. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  7. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale

  8. Preliminary Study on Testicular Germ Cell Transplantation of Endemic Species Oryzias celebensis

    Science.gov (United States)

    Andriani, I.; Agustiani, F.; Hassan, M.; Parenrengi, A.; Inoue, K.

    2018-03-01

    The research has been conducted to study some technical steps for male germ-plasm from endemic fish species such as some species of Oryzias fish in Indonesia to preserve and propagate through germ cell transplantation technology. For preliminary research, the study was started with germ cell characterization of testes, cryopreservation of TGC and the transplantation of Oryzias celebensis as candidates for surrogate broodstock of Oryzias fish male germ plasm. The data analized included the potential number of TGC as donor, the viability of cryopreserved TGC in two types of cryoprotectans and the survival rate of O.celebensis larvae as recipient after transplantation. The result showed that the average amount of TGC yielded after dissociation was 131000 ± 31349 with 74.2 % viability of TGC each. Cryoprotectan10% DMSO +glucose yielded higher viable of TGC. More than 80 % of O.celebensis larvae survived after transplantation. In conclusion, these preliminary data of O.celebensis as surrogate broodstock candidate will support the application of TGC transplantation technology in Oryzias endemic species.

  9. Preliminary study for unified management of CANDU safety codes and construction of database system

    International Nuclear Information System (INIS)

    Min, Byung Joo; Kim, Hyoung Tae

    2003-03-01

    It is needed to develop the Graphical User Interface(GUI) for the unified management of CANDU safety codes and to construct database system for the validation of safety codes, for which the preliminary study is done in the first stage of the present work. The input and output structures and data flow of CATHENA and PRESCON2 are investigated and the interaction of the variables between CATHENA and PRESCON2 are identified. Furthermore, PC versions of CATHENA and PRESCON2 codes are developed for the interaction of these codes and GUI(Graphic User Interface). The PC versions are assessed by comparing the calculation results with those by HP workstation or from FSAR(Final Safety Analysis Report). Preliminary study on the GUI for the safety codes in the unified management system are done. The sample of GUI programming is demonstrated preliminarily. Visual C++ is selected as the programming language for the development of GUI system. The data for Wolsong plants, reactor core, and thermal-hydraulic experiments executed in the inside and outside of the country, are collected and classified following the structure of the database system, of which two types are considered for the final web-based database system. The preliminary GUI programming for database system is demonstrated, which is updated in the future work

  10. Waste Feed Delivery System Phase 1 Preliminary RAM Analysis

    International Nuclear Information System (INIS)

    DYKES, A.A.

    2000-01-01

    This report presents the updated results of the preliminary reliability, availability, and maintainability (RAM) analysis of selected waste feed delivery (WFD) operations to be performed by the Tank Farm Contractor (TFC) during Phase I activities in support of the Waste Treatment and Immobilization Plant (WTP). For planning purposes, waste feed tanks are being divided into five classes in accordance with the type of waste in each tank and the activities required to retrieve, qualify, and transfer waste feed. This report reflects the baseline design and operating concept, as of the beginning of Fiscal Year 2000, for the delivery of feed from three of these classes, represented by source tanks 241-AN-102, 241-AZ-101 and 241-AN-105. The preliminary RAM analysis quantifies the potential schedule delay associated with operations and maintenance (OBM) field activities needed to accomplish these operations. The RAM analysis is preliminary because the system design, process definition, and activity planning are in a state of evolution. The results are being used to support the continuing development of an O and M Concept tailored to the unique requirements of the WFD Program, which is being documented in various volumes of the Waste Feed Delivery Technical Basis (Carlson. 1999, Rasmussen 1999, and Orme 2000). The waste feed provided to the WTP must: (1) meet limits for chemical and radioactive constituents based on pre-established compositional envelopes (i.e., feed quality); (2) be in acceptable quantities within a prescribed sequence to meet feed quantities; and (3) meet schedule requirements (i.e., feed timing). In the absence of new criteria related to acceptable schedule performance due to the termination of the TWRS Privatization Contract, the original criteria from the Tank Waste Remediation System (77443s) Privatization Contract (DOE 1998) will continue to be used for this analysis

  11. Notification: Preliminary Research on EPA's Decision Making Process to Release Information Under the Freedom of Information Act

    Science.gov (United States)

    July 19, 2013. The Office of Inspector General plans to begin preliminary research on the U.S. Environmental Protection Agency’s process for deciding to release information requested under the Freedom of Information Act.

  12. Preliminary study: Formaldehyde exposure in laboratories of Sharjah university in UAE

    OpenAIRE

    Ahmed, Hafiz Omer

    2011-01-01

    Objectives : Laboratory technicians, students, and instructors are at high risk, because they deal with chemicals including formaldehyde. Thus, this preliminary study was conducted to measure the concentration of formaldehyde in the laboratories of the University of Sharjah in UAE. Materials and Methods: Thirty-two air samples were collected and analyzed for formaldehyde using National Institute for Occupational Safety and Health (NIOSH) method 3500. In this method, formaldehyde reacts with c...

  13. 78 FR 56730 - Notice of Intent To Amend the Resource Management Plan for the Gunnison Field Office and Prepare...

    Science.gov (United States)

    2013-09-13

    ... submit comments on issues and planning criteria related to Hartman Rocks Special Recreation Area... the scoping process; and seeks public input on issues and preliminary planning criteria. The planning... manner that maintains or improves the condition and health of the unique landscape and natural resources...

  14. Preliminary study of magnet design for an SSC

    International Nuclear Information System (INIS)

    Taylor, C.E.; Meuser, R.B.

    1983-08-01

    The overriding design consideration for the SSC magnets is that cost of the facility be minimized; at 8 T, approximately 40 km of bending magnets is required for each ring of a 20 TeV collider. We present some results of a parametric study of two-in-one, iron-core magnets for an SSC. These results are necessarily preliminary in nature, and are intended only to show some of the trade-offs for a wide range of the variables. We show also some results for a reference design that produces 6.5 T in the aperture at 4.4 K for a coil inside diameter of 40 mm. It is not to be inferred that we have established this to be an optimum in any sense

  15. Predicting methylphenidate response in attention deficit hyperactivity disorder: a preliminary study.

    Science.gov (United States)

    Johnston, Blair A; Coghill, David; Matthews, Keith; Steele, J Douglas

    2015-01-01

    Methylphenidate (MPH) is established as the main pharmacological treatment for patients with attention deficit hyperactivity disorder (ADHD). Whilst MPH is generally a highly effective treatment, not all patients respond, and some experience adverse reactions. Currently, there is no reliable method to predict how patients will respond, other than by exposure to a trial of medication. In this preliminary study, we sought to investigate whether an accurate predictor of clinical response to methylphenidate could be developed for individual patients, using sociodemographic, clinical and neuropsychological measures. Of the 43 boys with ADHD included in this proof-of-concept study, 30 were classed as responders and 13 as non-responders to MPH, with no significant differences in age nor verbal intelligence quotient (IQ) between the groups. Here we report the application of a multivariate analysis approach to the prediction of clinical response to MPH, which achieved an accuracy of 77% (p = 0.005). The most important variables to the classifier were performance on a 'go/no go' task and comorbid conduct disorder. This preliminary study suggested that further investigation is merited. Achieving a highly significant accuracy of 77% for the prediction of MPH response is an encouraging step towards finding a reliable and clinically useful method that could minimise the number of children needlessly being exposed to MPH. © The Author(s) 2014.

  16. SU-E-T-632: Preliminary Study On Treating Nose Skin Using Energy and Intensity Modulated Electron Beams with Monte Carlo Based Dose Calculations

    International Nuclear Information System (INIS)

    Jin, L; Eldib, A; Li, J; Price, R; Ma, C

    2015-01-01

    Purpose: Uneven nose surfaces and air cavities underneath and the use of bolus present complexity and dose uncertainty when using a single electron energy beam to plan treatments of nose skin with a pencil beam-based planning system. This work demonstrates more accurate dose calculation and more optimal planning using energy and intensity modulated electron radiotherapy (MERT) delivered with a pMLC. Methods: An in-house developed Monte Carlo (MC)-based dose calculation/optimization planning system was employed for treatment planning. Phase space data (6, 9, 12 and 15 MeV) were used as an input source for MC dose calculations for the linac. To reduce the scatter-caused penumbra, a short SSD (61 cm) was used. Our previous work demonstrates good agreement in percentage depth dose and off-axis dose between calculations and film measurement for various field sizes. A MERT plan was generated for treating the nose skin using a patient geometry and a dose volume histogram (DVH) was obtained. The work also shows the comparison of 2D dose distributions between a clinically used conventional single electron energy plan and the MERT plan. Results: The MERT plan resulted in improved target dose coverage as compared to the conventional plan, which demonstrated a target dose deficit at the field edge. The conventional plan showed higher dose normal tissue irradiation underneath the nose skin while the MERT plan resulted in improved conformity and thus reduces normal tissue dose. Conclusion: This preliminary work illustrates that MC-based MERT planning is a promising technique in treating nose skin, not only providing more accurate dose calculation, but also offering an improved target dose coverage and conformity. In addition, this technique may eliminate the necessity of bolus, which often produces dose delivery uncertainty due to the air gaps that may exist between the bolus and skin

  17. The costs of the environmental administration in the planning of the electric sector in Colombia - methodological aspects

    International Nuclear Information System (INIS)

    Jurado Montano, Jose Lino

    2001-01-01

    The environmental costs came forth in the planning of the Colombian electrical sector by early 90's. The costs of environmental programs for generation projects were calculated, considering constraints and assumptions, some of them are still valid. The necessity to know the environmental costs of generation and transmission projects in preliminary stages of planning, as complement to indicative expansion plans, allowed the development of a model that assesses in advance the impacts and defines the costs of their environmental measures in future stages of construction and operation. The model uses geo-referenced basic information but sufficient to determine multiple impact and cost indicators. This model was developed with the active participation of representative agents of the electrical sector and will support UPME in valuation of expansion plans and it can supply preliminary costs to potential project investors in this sector

  18. Preliminary study on lithium-salt aqueous solution blanket

    International Nuclear Information System (INIS)

    Yoshida, Hiroshi; Naruse, Yuji; Yamaoka, Mitsuaki; Ohara, Atsushi; Ono, Kiyoshi; Kobayashi, Shigetada.

    1992-06-01

    Aqueous solution blanket using lithium salts such as LiNO 3 and LiOH have been studied in the US-TIBER program and ITER conceptual design activity. In the JAERI/LANL collaboration program for the joint operation of TSTA (Tritium Systems Test Assembly), preliminary design work of blanket tritium system for lithium ceramic blanket, aqueous solution blanket and liquid metal blanket, have been performed to investigate technical feasibility of tritium demonstration tests using the TSTA. Detail study of the aqueous solution blanket concept have not been performed in the Japanese fusion program, so that this study was carried out to investigate features of its concept and to evaluated its technical problems. The following are the major items studied in the present work: (i) Neutronics of tritium breeding ratio and shielding performance Lithium concentration, Li-60 enrichment, beryllium or lead, composition of structural material/beryllium/solution, heavy water, different lithium-salts (ii) Physicochemical properties of salts Solubility, corrosion characteristics and compatibility with structural materials, radiolysis (iii) Estimation of radiolysis in ITER aqueous solution blanket. (author)

  19. Marine spatial planning in Cyprus

    Science.gov (United States)

    Hadjimitsis, Diofantos; Agapiou, Athos; Mettas, Christodoulos; Themistocleous, Kyriacos; Evagorou, Evagoras; Cuca, Branka; Papoutsa, Christiana; Nisantzi, Argyro; Mamouri, Rodanthi-Elisavet; Soulis, George; Xagoraris, Zafiris; Lysandrou, Vasiliki; Aliouris, Kyriacos; Ioannou, Nicolas; Pavlogeorgatos, Gerasimos

    2015-06-01

    Marine Spatial Planning (MSP), which is in concept similar to land-use planning, is a public process by which the relevant Member State's authorities analyse and organise human activities in marine areas to achieve ecological, economic and social objectives. MSP aims to promote sustainable growth of maritime economies, sustainable development of marine areas and sustainable use of marine resources. This paper highlights the importance of MSP and provides basic outcomes of the main European marine development. The already successful MSP plans can provide useful feedback and guidelines for other countries that are in the process of implementation of an integrated MSP, such as Cyprus. This paper presents part of the MSP project, of which 80% funded by the European Regional Development Fund (ERDF) and 20% from national contribution. An overview of the project is presented, including data acquisition, methodology and preliminary results for the implementation of MSP in Cyprus.

  20. Personal Study Planning in Doctoral Education in Industrial Engineering

    Science.gov (United States)

    Lahenius, K.; Martinsuo, M.

    2010-01-01

    The duration of doctoral studies has increased in Europe. Personal study planning has been considered as one possible solution to help students in achieving shorter study times. This study investigates how doctoral students experience and use personal study plans in one university department of industrial engineering. The research material…

  1. Preliminary design report for the prototypical fuel rod consolidation system

    International Nuclear Information System (INIS)

    Rosa, J.M.

    1986-01-01

    This report documents NUTECH's preliminary design of a dry, spent fuel rod consolidation system. This preliminary design is the result of Phase I of a planned four phase project. The present report on this project provides a considerable amount of detail for a preliminary design effort. The design and all of its details are described in this Preliminary Design Report (PDR). The NUTECH dry rod consolidation system described herein is remotely operated. It provides for automatic operation, but with operator hold points between key steps in the process. The operator has the ability to switch to a manual operation mode at any point in the process. The system is directed by the operator using an executive computer which controls and coordinates the operation of the in-cell equipment. The operator monitors the process using an in-cell closed circuit television (CCTV) system with audio output and equipment status displays on the computer monitor. The in-cell mechanical equipment consists of the following: (1) two overhead cranes with manipulators; (2) a multi-degree of freedom fuel handling table and its clamping equipment; (3) a fuel assembly end fitting removal station and its tools; (4) a consolidator (which pulls rods, assembles the consolidated bundle and loads the canister); (5) a canister end cap welder and weld inspection system; (6) decontamination systems; and (7) the CCTV and microphone systems

  2. Wind farm layout optimization in complex terrain: A preliminary study on a Gaussian hill

    DEFF Research Database (Denmark)

    Feng, Ju; Shen, Wen Zhong

    2014-01-01

    this problem for WFs in flat terrain or offshore has been investigated in many studies, it is still a challenging problem for WFs in complex terrain. In this preliminary study, the wind flow conditions of complex terrain without WTs are first obtained from computational fluid dynamics (CFD) simulation...

  3. Journal of Island Studies: preliminary ideas from 1991, and comments from 2015

    Directory of Open Access Journals (Sweden)

    Russell King

    2015-05-01

    Full Text Available Some preliminary thoughts were penned in 1991, on the founding of an academic journal devoted to the study of the world’s islands. This collated contribution is an opportunity to look back critically at what was advised then, and what has actually come to pass through Island Studies Journal. Russell King’s prescient report from 1991 is followed by a series of candid reflections by members of ISJ’s International Editorial Board.

  4. Small modular biopower initiative Phase 1 feasibility studies executive summaries

    Energy Technology Data Exchange (ETDEWEB)

    Bain, R.

    2000-03-06

    The Phase 1 objective is a feasibility study that includes a market assessment, resource assessment, preliminary system design, and assessment of relevant environmental and safety considerations, and evaluation of financial and cost issues, and a preliminary business plan and commercialization strategy. Each participating company will share at least 20% of the cost of the first phase.

  5. Preliminary Safety Information Document for the Standard MHTGR. Volume 1, (includes latest Amendments)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-01-01

    With NRC concurrence, the Licensing Plan for the Standard HTGR describes an application program consistent with 10CFR50, Appendix O to support a US Nuclear Regulatory Commission (NRC) review and design certification of an advanced Standard modular High Temperature Gas-Cooled Reactor (MHTGR) design. Consistent with the NRC's Advanced Reactor Policy, the Plan also outlines a series of preapplication activities which have as an objective the early issuance of an NRC Licensability Statement on the Standard MHTGR conceptual design. This Preliminary Safety Information Document (PSID) has been prepared as one of the submittals to the NRC by the US Department of Energy in support of preapplication activities on the Standard MHTGR. Other submittals to be provided include a Probabilistic Risk Assessment, a Regulatory Technology Development Plan, and an Emergency Planning Bases Report.

  6. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  7. Resilience in post-Katrina New Orleans, Louisiana: a preliminary study.

    Science.gov (United States)

    Glandon, Douglas M; Muller, Jocelyn; Almedom, Astier M

    2008-12-01

    Much scholarly and practitioner attention to the impact of Hurricane Katrina on the city of New Orleans, Louisiana has focused on the failures of government disaster prevention and management at all levels, often overlooking the human strength and resourcefulness observed in individuals and groups among the worst-affected communities. This preliminary study sought to investigate human resilience in the city of New Orleans, State of Louisiana, eighteen months after Hurricane Katrina struck the Mississippi delta region. The Sense of Coherence scale, short form (SOC-13) was administered to a sample of 41 residents of Lower Ninth Ward and adjacent Wards who had been displaced by Hurricane Katrina but were either living in or visiting their home area during March 2007. Study participants were recruited through the local branch of the Association of Community Organizations for Reform Now (ACORN), a nation-wide grassroots organization whose mission is to promote the housing rights of low and moderate-income individuals and families across the USA and in several other countries. Those who had returned to their homes had significantly higher SOC scores compared to those who were still displaced (p<0.001). Among the latter, those who were members of ACORN scored significantly higher than non-members (p<0.005), and their SOC-13 scores were not significantly different from the scores of study participants who had returned home (including both members and non-members of ACORN). The findings of this preliminary study concur with previous reports in the literature on the deleterious impact of displacement on individual and collective resilience to disasters. Relevant insight gleaned from the qualitative data gathered during the course of administering the SOC-13 scale compensate for the limitations of the small sample size as they draw attention to the importance of the study participants' sources of social support. Possible avenues for further research are outlined.

  8. A preliminary study on the effects of star fruit consumption on antioxidant and lipid status in elderly Thai individuals

    Directory of Open Access Journals (Sweden)

    Leelarungrayub J

    2016-08-01

    Full Text Available Jirakrit Leelarungrayub,1 Araya Yankai,1 Decha Pinkaew,1 Rungthip Puntumetakul,2 James J Laskin,3 Richard J Bloomer4 1Department of Physical Therapy, Faculty of Associated Medical Sciences, Chiang Mai University, Chiang Mai, 2Research Center in Back, Neck, Other Joint Pain and Human Performance (BNOJPH, Khon Kaen University, Khon Kaen, Thailand; 3School of Physical Therapy and Rehabilitation Sciences, University of Montana, Missoula, MT, 4Cardiorespiratory/Metabolic Laboratory, School of Health Studies, University of Memphis, Memphis, TN, USA Objective: The aims of this preliminary study were to evaluate the antioxidant and lipid status before and after star fruit juice consumption in healthy elderly subjects, and the vitamins in star fruit extracts.Methods: A preliminary designated protocol was performed in 27 elderly individuals with a mean (±SD age of 69.5±5.3 years, by planning a 2-week control period before 4 weeks of consumption of star fruit twice daily. Oxidative stress parameters such as total antioxidant capacity, glutathione, malondialdehyde, protein hydroperoxide, multivitamins such as L-ascorbic acid (Vit C, retinoic acid (Vit A, and tocopherol (Vit E, and the lipid profile parameters such as cholesterol, triglyceride, high-density lipoprotein-cholesterol (HDL-C and low-density lipoprotein-cholesterol (LDL-C were analyzed. Moreover, Vit C, Vit A, and Vit E levels were evaluated in the star fruit extracts during the 4-week period.Results: In the 2-week control period, all parameters showed no statistically significant difference; after 4 weeks of consumption, significant improvement in the antioxidant status was observed with increased total antioxidant capacity and reduced malondialdehyde and protein hydroperoxide levels, as well as significantly increased levels of Vit C and Vit A, when compared to the two-time evaluation during the baseline periods. However, glutathione and Vit E showed no statistical difference. In addition

  9. Development of independent MU/treatment time verification algorithm for non-IMRT treatment planning: A clinical experience

    Science.gov (United States)

    Tatli, Hamza; Yucel, Derya; Yilmaz, Sercan; Fayda, Merdan

    2018-02-01

    The aim of this study is to develop an algorithm for independent MU/treatment time (TT) verification for non-IMRT treatment plans, as a part of QA program to ensure treatment delivery accuracy. Two radiotherapy delivery units and their treatment planning systems (TPS) were commissioned in Liv Hospital Radiation Medicine Center, Tbilisi, Georgia. Beam data were collected according to vendors' collection guidelines, and AAPM reports recommendations, and processed by Microsoft Excel during in-house algorithm development. The algorithm is designed and optimized for calculating SSD and SAD treatment plans, based on AAPM TG114 dose calculation recommendations, coded and embedded in MS Excel spreadsheet, as a preliminary verification algorithm (VA). Treatment verification plans were created by TPSs based on IAEA TRS 430 recommendations, also calculated by VA, and point measurements were collected by solid water phantom, and compared. Study showed that, in-house VA can be used for non-IMRT plans MU/TT verifications.

  10. Good Feedback for bad Players? A preliminary Study of ‘juicy’ Interface feedback

    DEFF Research Database (Denmark)

    Juul, Jesper; Jason, Begy

    2016-01-01

    The theories of game feel and juiciness claim that players will feel more competent, and that a game will be perceived as being of higher quality, when players are given large amounts of redundant audiovisual feedback in response to their actions. This poster describes a preliminary empirical study...

  11. A preliminary study to find out maximum occlusal bite force in Indian individuals

    DEFF Research Database (Denmark)

    Jain, Veena; Mathur, Vijay Prakash; Pillai, Rajath

    2014-01-01

    PURPOSE: This preliminary hospital based study was designed to measure the mean maximum bite force (MMBF) in healthy Indian individuals. An attempt was made to correlate MMBF with body mass index (BMI) and some of the anthropometric features. METHODOLOGY: A total of 358 healthy subjects in the ag...

  12. Preliminary Multi-Variable Cost Model for Space Telescopes

    Science.gov (United States)

    Stahl, H. Philip; Hendrichs, Todd

    2010-01-01

    Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. This paper reviews the methodology used to develop space telescope cost models; summarizes recently published single variable models; and presents preliminary results for two and three variable cost models. Some of the findings are that increasing mass reduces cost; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and technology development as a function of time reduces cost at the rate of 50% per 17 years.

  13. The Hospital Information Planning Study at Groote Schuur Hospital ...

    African Journals Online (AJOL)

    Information is an increasingly important resource in an academic hospital. Effective planning and control of this resource are essential in order to maximize its usefulness. Tile HOspital Information Planning Study (HIPS) undertaken at Groote Schuur Hospital, and based on. the Business Systems Planning (BSP) ...

  14. Sensitivity Measurement of Transmission Computer Tomography: thePreliminary Experimental Study

    International Nuclear Information System (INIS)

    Widodo, Chomsin-S; Sudjatmoko; Kusminarto; Agung-BS Utomo; Suparta, Gede B

    2000-01-01

    This paper reports result of preliminary experimental study onmeasurement method for sensitivity of a computed tomography (CT) scanner. ACT scanner has been build at the Department of Physics, FMIPA UGM and itsperformance based on its sensitivity was measured. The result showed that themeasurement method for sensitivity confirmed this method may be developedfurther as a measurement standard. Although the CT scanner developed has anumber of shortcoming, the analytical results from the sensitivitymeasurement suggest a number of reparations and improvements for the systemso that improved reconstructed CT images can be obtained. (author)

  15. Specification and Preliminary Validation of IAT (Integrated Analysis Techniques) Methods: Executive Summary.

    Science.gov (United States)

    1985-03-01

    conceptual framwork , and preliminary validation of IAT concepts. Planned work for FY85, including more extensive validation, is also described. 20...Developments: Required Capabilities .... ......... 10 2-1 IAT Conceptual Framework - FY85 (FEO) ..... ........... 11 2-2 Recursive Nature of Decomposition...approach: 1) Identify needs & requirements for IAT. 2) Develop IAT conceptual framework. 3) Validate IAT methods. 4) Develop applications materials. To

  16. Health impact assessment in planning: Development of the design for health HIA tools

    International Nuclear Information System (INIS)

    Forsyth, Ann; Slotterback, Carissa Schively; Krizek, Kevin J.

    2010-01-01

    How can planners more systematically incorporate health concerns into practical planning processes? This paper describes a suite of health impact assessment tools (HIAs) developed specifically for planning practice. Taking an evidence-based approach the tools are designed to fit into existing planning activities. The tools include: a short audit tool, the Preliminary Checklist; a structured participatory workshop, the Rapid HIA; an intermediate health impact assessment, the Threshold Analysis; and a set of Plan Review Checklists. This description provides a basis for future work including assessing tool validity, refining specific tools, and creating alternatives.

  17. MR evaluation of renal function. A preliminary study

    Energy Technology Data Exchange (ETDEWEB)

    Beomonte Zobel, B; Giammarile, F; Matarese, A; Gallucci, M; Mascicchi, C; Passariello, R; Di Renzi, P; Splendiani, G; Casciani, C U

    1988-01-01

    The amount of functioning renal parenchyma can be estimated by MRI by considering the ratio between the mean intensities of cortical and medullar zones of the kidney. Fifty-six patients and 5 healthy volunteers were studied by MRI in our department. Scanning was performed with a superconductive magnet system operating at 0.5 Tesla. Pulse sequence was Spin-Echo with TR 300/TE 30 ms. The cortimedullary ratio (CMR) and differentiation (CMD) were standardized and related with creatine blood levels. CMR data ranged from 1.05 to 3.00, while CMD data ranged from 0.04 to 0.50. High values (good cortico-medullary contrast) were observed in subjects with normal renal function. Patients with renal diseases had low CMR and CMD, proportionally to the degree of renal failure, as proved by laboratory findings. Our preliminary study seems to demonstrate that MRI is an useful technique in the follow-up of patients with chronic renal disease. 19 refs.

  18. Doublet III: status and future plans

    International Nuclear Information System (INIS)

    Rawls, J.M.

    1980-04-01

    A synopsis is presented of the experimental results from the ohmic heating phase of Doublet III, with emphasis on the production of good target plasmas for the upcoming neutral beam injection phase. The program plan for the device over the life of the US-Japan cooperative program is discussed, as is the status of the preliminary investigation into replacing the present vacuum vessel by one better suited for ETF simulation

  19. Autonomous Path Planning for Road Vehicles in Narrow Environments: An Efficient Continuous Curvature Approach

    Directory of Open Access Journals (Sweden)

    Domokos Kiss

    2017-01-01

    Full Text Available In this paper we introduce a novel method for obtaining good quality paths for autonomous road vehicles (e.g., cars or buses in narrow environments. There are many traffic situations in urban scenarios where nontrivial maneuvering in narrow places is necessary. Navigating in cluttered parking lots or having to avoid obstacles blocking the way and finding a detour even in narrow streets are challenging, especially if the vehicle has large dimensions like a bus. We present a combined approximation-based approach to solve the path planning problem in such situations. Our approach consists of a global planner which generates a preliminary path consisting of straight and turning-in-place primitives and a local planner which is used to make the preliminary path feasible to car-like vehicles. The approximation methodology is well known in the literature; however, both components proposed in this paper differ from existing similar planning methods. The approximation process with the proposed local planner is proven to be convergent for any preliminary global paths. The resulting path has continuous curvature which renders our method well suited for application on real vehicles. Simulation experiments show that the proposed method outperforms similar approaches in terms of path quality in complicated planning tasks.

  20. Assessing internet addiction using the parsimonious internet addiction components model—A preliminary study.

    OpenAIRE

    Kuss, D.J.; Shorter, G.W.; Rooij, A.J. van; Griffiths, M.D.; Schoenmakers, T.M.

    2014-01-01

    Internet usage has grown exponentially over the last decade. Research indicates that excessive Internet use can lead to symptoms associated with addiction. To date, assessment of potential Internet addiction has varied regarding populations studied and instruments used, making reliable prevalence estimations difficult. To overcome the present problems a preliminary study was conducted testing a parsimonious Internet addiction components model based on Griffiths’ addiction components (Journal ...

  1. Serum Ionized Calcium Quantification for Staging Canine Periodontal Disease: A Preliminary Study.

    Science.gov (United States)

    Miguel Carreira, L; Daniela, Dias; Pedro, Azevedo

    2015-06-01

    Periodontal diseases (PD) are infectious, inflammatory, progressive diseases of the oral cavity affecting people and dogs. PD takes 2 forms: gingivitis and periodontitis. Diagnosing or staging PD can be achieved only with dental x-rays and periodontal probing, both of which require the use of general anesthesia in dogs. This study aimed to determine whether serum ionized calcium ([iCa(2+)]) levels can be useful in preliminary PD staging in dogs. A sample of 40 dogs (n = 40) was divided into 4 groups (n = 10 each) based on the following PD stages: G1 (gingivitis), G2 (initial periodontitis), G3 (moderate periodontitis), and G4 (severe periodontitis). The groups were then subjected to [iCa(2+)] quantification. Statistically significant differences were observed between PD stages and [iCa(2+)] for all stages except G3 and G4. Therefore, this parameter can be used as an additional tool to establish and monitor preliminary PD status. Copyright © 2015 Elsevier Inc. All rights reserved.

  2. Road-corridor planning in the EIA procedure in Spain. A review of case studies

    Energy Technology Data Exchange (ETDEWEB)

    Loro, Manuel, E-mail: manuel.loro@upm.es [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politécnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Transport Research Centre (TRANSyT-UPM) Universidad Politécnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigación del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politécnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Arce, Rosa M., E-mail: rosa.arce.ruiz@upm.es [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politécnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Transport Research Centre (TRANSyT-UPM) Universidad Politécnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigación del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politécnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Ortega, Emilio, E-mail: e.ortega@upm.es [Transport Research Centre (TRANSyT-UPM) Universidad Politécnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigación del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politécnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Department of Construction and Rural Roads, Forestry Engineering School, Universidad Politécnica de Madrid, Ciudad Universitaria s/n, 28040 Madrid (Spain); and others

    2014-01-15

    The assessment of different alternatives in road-corridor planning must be based on a number of well-defined territorial variables that serve as decision making criteria, and this requires a high-quality preliminary environmental assessment study. In Spain the formal specifications for the technical requirements stipulate the constraints that must be considered in the early stages of defining road corridors, but not how they should be analyzed and ranked. As part of the feasibility study of a new road definition, the most common methodology is to establish different levels of Territorial Carrying Capacity (TCC) in the study area in order to summarize the territorial variables on thematic maps and to ease the tracing process of road-corridor layout alternatives. This paper explores the variables used in 22 road-construction projects conducted by the Ministry of Public Works that were subject to the Spanish EIA regulation and published between 2006 and 2008. The aim was to evaluate the quality of the methods applied and the homogeneity and suitability of the variables used for defining the TCC. The variables were clustered into physical, environmental, land-use and cultural constraints for the purpose of comparing the TCC values assigned in the studies reviewed. We found the average quality of the studies to be generally acceptable in terms of the justification of the methodology, the weighting and classification of the variables, and the creation of a synthesis map. Nevertheless, the methods for assessing the TCC are not sufficiently standardized; there is a lack of uniformity in the cartographic information sources and methodologies for the TCC valuation. -- Highlights: • We explore 22 road-corridor planning studies subjected to the Spanish EIA regulation. • We analyze the variables selected for defining territorial carrying capacity. • The quality of the studies is acceptable (methodology, variable weighting, mapping). • There is heterogeneity in the

  3. A preliminary feasibility study on natural analogue in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chun Soo; Bae, Dae Seok; Kim, Kyung Su; Koh, Yong Kwon; Park, Byung Yun

    2000-03-01

    Preliminary study on the assessment of natural analogue study in Korea for the deep geological disposal of high-level radioactive waste was carried out. The project on natural analogue study in other countries are introduced. The uranium-bearing deposit in Okcheon belt are summarized, which reported to be uranium-bearing minerals in order to assess to feasibility for natural analogue study in Korea. Among the uranium-bearing deposits, the Deokpyeong area, reported to be the highest reservoir and grade, are selected as the study site, and the elementary investigation, including survey of radioactivity and geochemistry are carried out. According to the investigation of surface environment, the radioactivity and uranium content in the surface water and shallow groundwater does not show any anormal values. However, the radioactivity is expected to be increased in depth and the groundwater reacted with uranium-bearing graphite formation shows high unanium content, indicating the potential possibility for natural analogue study in Korea. In future, if more detail study are performed, the assessment of natural analogue study in Korea are expected.

  4. [Stress at work among military doctors: a preliminary study].

    Science.gov (United States)

    Knezević, Bojana; Belosević, Ljiljana

    2006-09-01

    This preliminary study examined the sources of work stress in military physicians. Forty-eight medical doctors (24 military and 24 civilian) completed a questionnaire on stressors at the work place. The participation in the study was anonymous and voluntary. Out of 24 military physicians, 14 were military general practitioners (mean age 40.5, 14 female), and 10 were consultants of different specialties (mean age 43.5, 7 male and 3 female). Civilian physicians included 13 general practitioners working at primary health care system (mean age 37, 3 male and 10 female), and 11 consultants of different specialties working at out of hospital practice (average age 37, 6 male and 5 female). The questionnaire included items aiming to obtain demographic characteristics (sex, age, marital status, children, academic degree, clinical specialty, work place, average time in practice, average time at current position) and 37 items to determine occupational stressors. The stressors were related to work management, professional demands, interpersonal and patient-doctor relationship. Differences in recognizing work stressors between the groups of civilian and military physicians were statistically analyzed by using chi-squared-test. The leading work stressors identified by military physicians were inadequate salary, being bypassed for promotion, inadequate continuous education, poor resources, poor communication with superiors, poor management, trouble with superiors, excessive paperwork, unpredictable situations, and 24-hour standby. Civilian physicians reported inadequate salary, poor resources, poor management, misinformed patients, lack of co-workers, lack of time, unpredictable situations, exposure to indictment, dealing with incurable patients and exposure to public criticism and judgment. In comparison with civilian physicians, military physicians significantly more frequently reported inadequate salary (pcommunication with superiors (pcommunication with superiors (12

  5. Preliminary studies of the biosynthesis of Austin

    International Nuclear Information System (INIS)

    Wicnienski, N.A.

    1979-01-01

    Aspergillus ustus is one of the most prevalent fungi in the soil. There are now two reports of the occurrence of toxin-producing strains of this fungus on stored foodstuffs. In addition, strains of A. ustus have been isolated along with Penicillium species from samples of South African cheeses. All A. ustus isolates tested were judged to be highly toxic to ducklings when grown on maize meal, however, the toxins involved were not isolated. Austin is the trivial name of one of the toxins made by the fungus found on stored food. Preliminary work to studying the biosynthesis of this compound using 13 C-labeled sodium acetate is reported here. The feasibility of the biosynthetic study was determined by feeding [1- 14 C]-sodium acetate to A. ustus cultures. The assignments made in the 13 C-nmr spectrum of Austin are shown. The lowest dilution factor obtained in [1- 14 C]-sodium acetate feeding experiments was 14. This dilution factor is sufficiently low to allow a successful feeding of [1,2- 13 C 2 ]-sodium acetate. A new metabolite of A. ustus, deacetylaustin, was isolated and identified. An alkaloid of unknown structure was also isolated from the fungus

  6. Second law of thermodynamics and urban green infrastructure - A knowledge synthesis to address spatial planning strategies

    OpenAIRE

    Raffaele Pelorosso; Federica Gobattoni; Maria Nicolina Ripa; Antonio Leone

    2018-01-01

    Planning of ecosystem services provided by the Urban Green Infrastructure (UGI) is a key issue for urban sustainability. Planning strategies driven by the second law of thermodynamics (SLT) are innovative approaches to sustainability but they are still in seminal phase. In this article, a coupled review of SLT within spatial planning is accomplished looking at the main applications in urban green infrastructure (UGI) planning. The work has supported the definition of a preliminary low-entropy...

  7. Comparing landscape planning in England, Germany and the Netherlands : policy contexts and three case study plans

    NARCIS (Netherlands)

    Schröder, R.R.G.; Wascher, D.M.; Odell, S.; Smith, C.

    2010-01-01

    This comparative study of landscape planning, within three case-studies in England, Germany and the Netherlands, has the proposed outcomes to create a mutually understood model for ‘landscape planning’, a catalogue of key concepts on space, landscape and planning and a proposal for further European

  8. Low-level arsenic exposure via drinking water consumption and female fecundity - A preliminary investigation.

    Science.gov (United States)

    Susko, Michele L; Bloom, Michael S; Neamtiu, Iulia A; Appleton, Allison A; Surdu, Simona; Pop, Cristian; Fitzgerald, Edward F; Anastasiu, Doru; Gurzau, Eugen S

    2017-04-01

    High level arsenic exposure is associated with reproductive toxicity in experimental and observational studies; however, few data exist to assess risks at low levels. Even less data are available to evaluate the impact of low level arsenic exposure on human fecundity. Our aim in this pilot study was a preliminary evaluation of associations between low level drinking water arsenic contamination and female fecundity. This retrospective study was conducted among women previously recruited to a hospital-based case-control study of spontaneous pregnancy loss in Timiṣ County, Romania. Women (n=94) with planned pregnancies of 5-20 weeks gestation completed a comprehensive physician-administered study questionnaire and reported the number of menstrual cycles attempting to conceive as the time to pregnancy (TTP). Drinking water samples were collected from residential drinking water sources and we determined arsenic levels using hydride generation-atomic absorption spectrometry (HG-AAS). Multivariable Cox-proportional hazards regression with Efron approximation was employed to evaluate TTP as a function of drinking water arsenic concentrations among planned pregnancies, adjusted for covariates. There was no main effect for drinking water arsenic exposure, yet the conditional probability for pregnancy was modestly lower among arsenic exposed women with longer TTPs, relative to women with shorter TTPs, and relative to unexposed women. For example, 1µg/L average drinking water arsenic conferred 5%, 8%, and 10% lower likelihoods for pregnancy in the 6th, 9th, and 12th cycles, respectively (P=0.01). While preliminary, our results suggest that low level arsenic contamination in residential drinking water sources may further impair fecundity among women with longer waiting times; however, this hypothesis requires confirmation by a future, more definitive study. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. A Preliminary Study on Cathodic Prevention in Reinforced Mortar

    NARCIS (Netherlands)

    Koleva, D.A.; Van Breugel, K.; Mol, J.M.C.; De Wit, J.H.W.

    2010-01-01

    This work presents the preliminary tests on the performance of cathodic prevention (CPre) in reinforced mortar, subjected to aggressive (10% NaCl environment). Cathodic prevention is an electrochemical technique for minimizing, actually "preventing" any eventual corrosion of the steel bars in

  10. Using the Theory of Planned Behaviour to examine enrolled nursing students' intention to care for patients with alcohol dependence: A survey study.

    Science.gov (United States)

    Talbot, Anna-Lisa; Dorrian, Jillian; Chapman, Janine

    2015-11-01

    Nurses are often the first point of contact for patients hospitalized due to alcohol-related causes. Alcohol dependence is highly stigmatized and as a result healthcare professionals often have low behavioural intentions, meaning low willingness to care for these patients. This can have a direct influence on quality of care. The purpose of this study was to explore enrolled nursing students' intention to care for patients with alcohol dependence and the antecedents, preliminary factors, that predict this within the Theory of Planned Behaviour; specifically attitudes, subjective norms, self-efficacy and controllability. The study was a cross-sectional survey using the Theory of Planned Behaviour. Two Technical and Further Education South Australia campuses across metropolitan Adelaide. n=86 enrolled nursing students completed the survey (62% response rate). Enrolled nursing students' intention, attitudes, subjective norms, self-efficacy and controllability were measured using a Theory of Planned Behaviour Questionnaire. The Short Alcohol and Alcohol Problems Perception Questionnaire investigated attitudes in more detail and a short knowledge scale assessed alcohol-related knowledge. Subjective norms and attitudes had a significant, positive effect on intention to care within the final model, accounting for 22.6% of the variance, F2,83=12.12, pbehavioural change, in order to improve the quality of care for these patients. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Work Experiences of People with Mental Illness in Malaysia: A Preliminary Qualitative Study

    Science.gov (United States)

    Boo, Su-Lyn; Loong, Jaymee; Ng, Wai-Sheng

    2011-01-01

    This is a preliminary qualitative study, using a basic interpretive approach, to investigate the work experiences of people with mental illness in Malaysia. Six females and four males (aged 30-70) from a residential home for the mentally ill participated in semi-structured interviews. Three inter-relating themes emerged, namely the experience of…

  12. Ares-I-X Vehicle Preliminary Range Safety Malfunction Turn Analysis

    Science.gov (United States)

    Beaty, James R.; Starr, Brett R.; Gowan, John W., Jr.

    2008-01-01

    Ares-I-X is the designation given to the flight test version of the Ares-I rocket (also known as the Crew Launch Vehicle - CLV) being developed by NASA. As part of the preliminary flight plan approval process for the test vehicle, a range safety malfunction turn analysis was performed to support the launch area risk assessment and vehicle destruct criteria development processes. Several vehicle failure scenarios were identified which could cause the vehicle trajectory to deviate from its normal flight path, and the effects of these failures were evaluated with an Ares-I-X 6 degrees-of-freedom (6-DOF) digital simulation, using the Program to Optimize Simulated Trajectories Version 2 (POST2) simulation framework. The Ares-I-X simulation analysis provides output files containing vehicle state information, which are used by other risk assessment and vehicle debris trajectory simulation tools to determine the risk to personnel and facilities in the vicinity of the launch area at Kennedy Space Center (KSC), and to develop the vehicle destruct criteria used by the flight test range safety officer. The simulation analysis approach used for this study is described, including descriptions of the failure modes which were considered and the underlying assumptions and ground rules of the study, and preliminary results are presented, determined by analysis of the trajectory deviation of the failure cases, compared with the expected vehicle trajectory.

  13. Preliminary design study of a large scale graphite oxidation loop

    International Nuclear Information System (INIS)

    Epel, L.G.; Majeski, S.J.; Schweitzer, D.G.; Sheehan, T.V.

    1979-08-01

    A preliminary design study of a large scale graphite oxidation loop was performed in order to assess feasibility and to estimate capital costs. The nominal design operates at 50 atmospheres helium and 1800 F with a graphite specimen 30 inches long and 10 inches in diameter. It was determined that a simple single walled design was not practical at this time because of a lack of commercially available thick walled high temperature alloys. Two alternative concepts, at reduced operating pressure, were investigated. Both were found to be readily fabricable to operate at 1800 F and capital cost estimates for these are included. A design concept, which is outside the scope of this study, was briefly considered

  14. Learning Outcomes in Vocational Education: A Business Plan Development by Production-Based Learning Model Approach

    Science.gov (United States)

    Kusumaningrum, Indrati; Hidayat, Hendra; Ganefri; Anori, Sartika; Dewy, Mega Silfia

    2016-01-01

    This article describes the development of a business plan by using production-based learning approach. In addition, this development also aims to maximize learning outcomes in vocational education. Preliminary analysis of curriculum and learning and the needs of the market and society become the basic for business plan development. To produce a…

  15. VSP - Discussion: The Common Interest on Planning Hulls and Plan for Collaboration Studies between NSWC and KRISO - Washington DC

    Science.gov (United States)

    2016-03-07

    planning hulls and plan for N62909-15-1-2052 collaboration studies between NSWC and KRISO - Washington DC Sb. GRANT NUMBER N62909-15-1-2052 Sc. PROGRAM...be carried out in MASK’s facilities. We discussed common interests on planing hulls, and made plans for collaboration studies between NSWC and KRISO ...Presentation of USV project in KRISO 8/19/2015 (Wed) • Discussion of common interests about planing hu lls • Planning for collaboration studies

  16. AI-guided parameter optimization in inverse treatment planning

    International Nuclear Information System (INIS)

    Yan Hui; Yin Fangfang; Guan Huaiqun; Kim, Jae Ho

    2003-01-01

    An artificial intelligence (AI)-guided inverse planning system was developed to optimize the combination of parameters in the objective function for intensity-modulated radiation therapy (IMRT). In this system, the empirical knowledge of inverse planning was formulated with fuzzy if-then rules, which then guide the parameter modification based on the on-line calculated dose. Three kinds of parameters (weighting factor, dose specification, and dose prescription) were automatically modified using the fuzzy inference system (FIS). The performance of the AI-guided inverse planning system (AIGIPS) was examined using the simulated and clinical examples. Preliminary results indicate that the expected dose distribution was automatically achieved using the AI-guided inverse planning system, with the complicated compromising between different parameters accomplished by the fuzzy inference technique. The AIGIPS provides a highly promising method to replace the current trial-and-error approach

  17. Preliminary Report: Analysis of the baseline study on the prevalence of Salmonella in laying hen flocks of Gallus gallus

    DEFF Research Database (Denmark)

    Hald, Tine

    This is a preliminary report on the analysis of the Community-wide baseline study to estimate the prevalence of Salmonella in laying hen flocks. It is being published pending the full analysis of the entire dataset from the baseline study. The report contains the elements necessary for the establ......This is a preliminary report on the analysis of the Community-wide baseline study to estimate the prevalence of Salmonella in laying hen flocks. It is being published pending the full analysis of the entire dataset from the baseline study. The report contains the elements necessary...

  18. Response to Absorber-Focus Coil Preliminary Safety Review Panel

    International Nuclear Information System (INIS)

    Barr, Giles; Baynham, Elwyn; Black, Edgar; Bradshaw, Tom; Cummings, Mary Anne; Green, Michael A.; Ishimoto, Shigeru; Ivanyushenkov, Yury; Lau, Wing; Zisman, Michael S.

    2004-01-01

    In this document we provide responses to the various issues raised in the report of the Preliminary Safety Review Panel (see http://mice.iit.edu/mnp/MICE0069.pdf). In some cases we have made design changes in response to the Panels suggestions. In other cases, we have chosen not to do so. In a few cases, we indicate our plans, although the tasks have not yet been completed. For simplicity, the responses are organized along the same lines as those of the Panel Report

  19. Carotid sparing intensity modulated radiotherapy on early glottic cancer: Preliminary study

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Hoon Sik; Jeong, Bae Kwon; Jeong, Ho Jin; Song, Jin Ho; Kim, Jin Pyeong; Park, Jung Je; Woo, Seung Hoon; Kang, Ki Mun [Gyeongsang National University Hospital, Gyeongsang National University School of Medicine, Jinju (Korea, Republic of)

    2016-03-15

    To compare the dose distribution between carotid sparing intensity modulated radiotherapy (IMRT) and opposed lateral field technique (LAFT), and to determine the effects of carotid sparing IMRT in early glottic cancer patients who have risk factors for atherosclerosis. Ten early glottic cancer patients were treated with carotid sparing IMRT. For each patient, the conventional LAFT plan was developed for comparison. IMRT and LAFT plans were compared in terms of planning target volume (PTV) coverage, conformity index, homogeneity index, and the doses to planning organ at risk volume (PRV) for carotid arteries, spinal cord and pharyngeal constrictor muscle. Recurrence was not observed in any patients during the follow-up period. V95% for PTV showed no significant difference between IMRT and LAFT plans, while V100% was significantly higher in the IMRT plan (95.5% vs. 94.6%, p = 0.005). The homogeneity index (11.6%) and conformity index (1.4) in the IMRT plan were significantly better than those in the LAFT plans (8.5% and 5.1, respectively) (p = 0.005). The median V5Gy (90.0%), V25Gy (13.5%), and V50Gy (0%) for carotid artery PRV in the IMRT plan were significantly lower than those in the LAFT plan (99.1%, 89.0%, and 77.3%, respectively) (p = 0.005). Our study suggests that carotid sparing IMRT can significantly decrease the dose to carotid arteries compared to LAFT, and it would be considered for early glottic cancer patient with high risk of atherosclerosis.

  20. Evaluation of CT virtual intravascular endoscopy in fenestrated stent grafts: a preliminary study

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Z. [Dept. of Imaging and Applied Physics, Curtin Univ. of Tech., Perth, WA (Australia); Allen, Y.; Fitzsimmons, B.; Hartely, D. [Cook R and D, WA (Australia); Lawrence-Brown, M. [Dept. of Public Health, Curtin Univ. of Tech., Perth, WA (Australia)

    2007-06-15

    We aim in this study to investigate the potential value of CT virtual intravascular endoscopy in patients diagnosed with abdominal aortic aneurysms undergoing fenestrated stent grafts. Both pre-and post-fenestration (within 3 months of implantation) multislice CT data were collected in eight patients and used for generation of virtual endoscopy images in our preliminary study. Variable fenestrations were deployed in 25 aortic branches with scallop fenestration implanted in six aortic ostia, large fenestration in four aortic ostia and small fenestration in 15 renal ostia, respectively. Measurements of the aortic ostia diameters both pre- and post-fenestration were successfully performed with virtual intravascular endoscopy visualization, and endovascular stents as well as their relationship to the aortic ostia were clearly demonstrated. Our results showed that there was no significant change of diameter of the aortic ostia following fenestrated stem grafts. Endovascular stents were clearly visualized on virtual endoscopy images, and no apparent deformity or malrotation was observed in this small group. Our preliminary study provides new insights into anatomic configuration/dimension of aortic ostia and endovascular stents, and virtual intravascular endoscopy could be a valuable technique to follow-up patients treated with fenestrated stent grafts. (orig.)

  1. Evaluation of CT virtual intravascular endoscopy in fenestrated stent grafts: a preliminary study

    International Nuclear Information System (INIS)

    Sun, Z.; Allen, Y.; Fitzsimmons, B.; Hartely, D.; Lawrence-Brown, M.

    2007-01-01

    We aim in this study to investigate the potential value of CT virtual intravascular endoscopy in patients diagnosed with abdominal aortic aneurysms undergoing fenestrated stent grafts. Both pre-and post-fenestration (within 3 months of implantation) multislice CT data were collected in eight patients and used for generation of virtual endoscopy images in our preliminary study. Variable fenestrations were deployed in 25 aortic branches with scallop fenestration implanted in six aortic ostia, large fenestration in four aortic ostia and small fenestration in 15 renal ostia, respectively. Measurements of the aortic ostia diameters both pre- and post-fenestration were successfully performed with virtual intravascular endoscopy visualization, and endovascular stents as well as their relationship to the aortic ostia were clearly demonstrated. Our results showed that there was no significant change of diameter of the aortic ostia following fenestrated stem grafts. Endovascular stents were clearly visualized on virtual endoscopy images, and no apparent deformity or malrotation was observed in this small group. Our preliminary study provides new insights into anatomic configuration/dimension of aortic ostia and endovascular stents, and virtual intravascular endoscopy could be a valuable technique to follow-up patients treated with fenestrated stent grafts. (orig.)

  2. Trade study plan for Reusable Hydrogen Composite Tank System (RHCTS)

    Science.gov (United States)

    Greenberg, H. S.

    1994-07-01

    This TA 1 document describes the trade study plan (with support from TA 2) that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination. The analysis uses information derived in the TA 2 study as identified within the study plan. In view of this, for convenience, the TA 2 study plan is included as an appendix to this document.

  3. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  4. Zero-gravity cloud physics laboratory: Experiment program definition and preliminary laboratory concept studies

    Science.gov (United States)

    Eaton, L. R.; Greco, E. V.

    1973-01-01

    The experiment program definition and preliminary laboratory concept studies on the zero G cloud physics laboratory are reported. This program involves the definition and development of an atmospheric cloud physics laboratory and the selection and delineations of a set of candidate experiments that must utilize the unique environment of zero gravity or near zero gravity.

  5. A Qualitative Study of Factors Influencing Racial Diversity in Environmental Education: Preliminary Results

    Science.gov (United States)

    Kathy James; Leo H. McAvoy

    1992-01-01

    This study presents preliminary result interviews with people of color working in environmental education and interpretation throughout the United States. The three primary questions asked were these? (1) What path led each individual to a career in environmental education; (2) How does each individual define environmentalism? and (3) What are the primary issues this...

  6. Preliminary economic feasibility study of MIP (Medical Isotopes Producer)

    International Nuclear Information System (INIS)

    Mon, G. H.; O, S. Y.

    2004-01-01

    Preliminary economic feasibility study of MIP (Medical Isotopes Producer), which is used liquid nuclear fuel to produce medical isotopes of Mo-99 and Sr-89, was performed. To do this, this study was estimated the IRR(Internal Rate of Return) and PBP(Pay-back Period) about optimistic and pessimistic cases for market penetration of Asia and U.S.A. isotope markets. And sensitivity analysis is also performed about capital cost and price of Mo-99 and Sr-89. According to the results, IRR was between 14.9% and 24.3%, and PBP was between 4.8 years and 7.8 years. These suggest that MIP has economic merits. MIP can produce other medical isotopes such as Sr-90, I-131, Xe-133, Cs-137. So, it is necessary to do cost-benefit analysis considering production of these other isotopes

  7. Study on Top-Down Estimation Method of Software Project Planning

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jun-guang; L(U) Ting-jie; ZHAO Yu-mei

    2006-01-01

    This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, Program Evaluation and Review Technique (PERT) method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning.

  8. A study on the TMIS plan of KEPCO

    International Nuclear Information System (INIS)

    1988-08-01

    This report contains purpose and methods of study, present condition of MIS of Korea electric power, long-term plan for Korea electric power of MIS and development plan, MIS of management department and development plan of office automation, electric power production and transport automation, research of utilization of MIS, development and organization of MIS, network of electric power. Last it deals with conclusion and opinion for the MIS computers and communication of Korea electric power, and suggestion for the improvement of the organization.

  9. Water Safety Plan for drinking water risk management: the case study of Mortara (Pavia, Italy

    Directory of Open Access Journals (Sweden)

    Sabrina Sorlini

    2017-08-01

    Full Text Available The Water Safety Plan (WSP approach is an iterative method focused on analyzing the risks of water contamination in a drinking water supply system, from catchment to consumer, in order to protect human health. This approach is aimed at identifying and drastically reducing water contamination in the entire drinking water system, through the identification and mitigation or, if possible, elimination of all factors that may cause a chemical, physical, microbiological and radiological risk for water. This study developed a proposal of WSP for the drinking water supply system (DWSS of Mortara, Italy, in order to understand which are the preliminary evaluation aspects to be considered in the elaboration of a WSP. The DWSS of Mortara (a town of 15,500 inhabitants, located in northern Italy consists of three drinking water treatment plants (DWTPs, considering the following main contaminants: arsenic, iron, manganese and ammonia. Potential hazardous events and associated hazards were identified in each part of the water supply system. The risk assessment was carried out following the semi quantitative approach. The WSP proposal for Mortara was very useful not only as a risk mitigation approach, but also as a cost-effective tool for water suppliers. Furthermore, this approach will reduce public health risk, ensure a better compliance of water quality parameters with regulatory requirements, increase confidence of consumers and municipal authorities, and improve resource management due to intervention planning. Further, some new control measures are proposed by the WSP team within this work.

  10. Preliminary study on metallic inclusion in nuclear fuel

    International Nuclear Information System (INIS)

    Fukuzawa, Takashi; Tanaka, Masahiro; Tanabe, Tetsuo; Imoto, Shosuke

    1984-01-01

    In recent postirradiation tests, metallic fission products such as Mo, Ru, Rh and Pd are known to precipitate as metallic inclusions in the fuel. These inclusions remain as insoluble residues and provide various problems in different fields of the reprocessing. In this report are presented preliminary results of the study on the ternary phase diagram of Mo-Ru-Pd system and on their properties in nitric acid or various oxidative environments. It is concluded that (1) most of metallic inclusions which are insoluble in nitric acid show epsilon phase, Ru base hcp alloy, in which a large amount of Mo and Pd are soluble, (2) Pd, however, seems to deposit separately in the fuel pin because of its high vapor pressure, (3) Mo fraction in the inclusion would be highly dependent on oxygen potential in the fuel pin. (author)

  11. Preliminary study for the National Energy Plan (PEN) uses the Community market as a reference base. El ante-proyecto del Plan Energetico Nacional (PEN) toma referencia basica del mercado comunitario

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    The National Energy Plan (PEN) for the period 1991 to 2000 lays down basic guidelines for a Spanish energy policy. This includes a wide range of economic measures. The PEN is divided into five main sections with two appendices. The sections are: the international situation; energy demand; energy supply; energy and the environment; and R D policy. The appendices are: Energy-saving and energy-efficiency plan; and General plan for radioactive waste. The PEN provides for 4-year research programmes which aim to reduce the environmental impact of energy production and use. General demand for energy during this period will increase by2.4% and investment in power installations and in the gas sector will be some 1.5 thousand million pesetas. 4 figs., 3 tabs.

  12. The effects of electric forces on dust lifting: Preliminary studies with a numerical model

    International Nuclear Information System (INIS)

    Kok, J F; Renno, N O

    2008-01-01

    Atmospheric dust aerosols affect the Earth's climate by scattering and absorbing radiation and by modifying cloud properties. Recent experiments have indicated that electric fields produced in dusty phenomena such as dust storms and dust devils could enhance the emission of dust aerosols. However, the generation of electric fields in dusty phenomena is poorly understood. To address this problem, we present results from the first physically-based numerical model of electric fields in dust lifting. Our model calculates the motion and collisions of air-borne particles, as well as the charge transfer during these collisions. This allows us to simulate the formation of electric fields as a function of physical parameters, such as wind stress and soil properties. Preliminary model results show that electric fields can indeed enhance the lifting of soil particles. Moreover, they suggest that strong electric fields could trigger a positive feedback because increases in the concentration of charged particles strengthen the original electric field, which in turn lifts additional surface particles. We plan to further test and calibrate our model with experimental data.

  13. The scientific activities of CERN and budget estimates for the years 2003-2010 - preliminary orientations

    CERN Document Server

    2002-01-01

    This paper presents preliminary orientations for the Long-Term Plan 2003-2010. It focuses on choices in the scientific programme, savings, organisational measures and financial scenarios to deal with the cost increase of the LHC project. The paper is presented for discussion. The outcome of this discussion, as well as the observations and recommendations of the External Review Committee, which started its work while this paper was in preparation, will be taken into account for the plan which the Management is preparing for June 2002.

  14. The scientific activities of CERN and budget estimates for the years 2003-2010 - Preliminary orientations

    CERN Document Server

    2002-01-01

    This paper presents preliminary orientations for the Long-Term Plan 2003-2010. It focuses on choices in the scientific programme, savings, organisational measures and financial scenarios to deal with the cost increase of the LHC project. The paper is presented for discussion. The outcome of this discussion, as well as the observations and recommendations of the External Review Committee, which started its work while this paper was in preparation, will be taken into account for the plan which the Management is preparing for June 2002.

  15. A preliminary feasibility study of passive in-core thermionic reactors for highly compact space nuclear power systems

    International Nuclear Information System (INIS)

    Parlos, A.G.; Khan, E.U.; Frymire, R.; Negron, S.; Thomas, J.K.; Peddicord, K.L.

    1991-01-01

    Results of a preliminary feasibility study on a new concept for a highly compact space reactor power systems are presented. Notwithstanding the preliminary nature of the present study, the results which include a new space reactor configuration and its associated technologies indicate promising avenues for the devleopment of highly compact space reactors. The calculations reported in this study include a neutronic design trade-off study using a two-dimensioinal neutron transport model, as well as a simplified one-dimensional thermal analysis of the reactor core. In arriving at the most desirable configuration, various options have been considered and analyzed, and their advantages/disadvantages have been compared. However, because of space limitation, only the most favorable reactor configuration is presented in this summary

  16. Collaborative Adaptation Planning for Water Security: Preliminary Lessons, Challenges, and the Way Forward for Maipo Basin Adaptation Plan, Chile

    Science.gov (United States)

    Vicuna, S.; Scott, C. A.; Bonelli, S.; Bustos, E.; Meza, F. J.

    2014-12-01

    The Maipo basin holds 40% of Chile's total population and almost half of the country's Gross Domestic Product. The basin is located in the semiarid central region of the country and, aside from the typical pressures of growth in developing country basins, the Maipo river faces climate change impacts associated with a reduction in total runoff and changes in its seasonality. Surface water is the main water source for human settlements and economic activities including agriculture. In 2012 we started a research project to create a climate variability and climate change adaptation plan for the basin. The pillars of the plan are co-produced by researchers and a Scenario Building Team (SBT) with membership of relevant water and land use stakeholders (including from civil society, public and private sectors) in the basin. Following similar experiences in other regions in the world that have faced the challenges of dealing with long term planning under uncertainty, the project has divided the task of developing the plan into a series of interconnected elements. A critical first component is to work on the desired vision(s) of the basin for the future. In this regards, the "water security" concept has been chosen as a framework that accommodates all objectives of the SBT members. Understanding and quantifying the uncertainties that could affect the future water security of the basin is another critical aspect of the plan. Near and long term climate scenarios are one dimension of these uncertainties that are combined with base development uncertainties such as urban growth scenarios. A third component constructs the models/tools that allows the assessment of impacts on water security that could arise under these scenarios. The final critical component relates to the development of the adaptation measures that could avoid the negative impacts and/or capture the potential opportunities. After two years in the development of the adaptation plan a series of results has been

  17. The perils of altering incentive plans: A case study

    OpenAIRE

    Kauhanen, Antti

    2011-01-01

    This paper studies a retail chain that introduced a sales incentive plan that rewarded for exceeding a sales target and subsequently cut the incentive intensity in addition to increasing the target. Utilizing monthly panel data for 54 months for all 53 units of the chain the paper shows that the introduction of the sales incentive plan increased sales and profitability, while the changes in the plan lead to a marked drop in sales and profitability. Thus, modifying the incentive plan proved co...

  18. Hanford Mission Plan risk-based prioritization methodologies

    International Nuclear Information System (INIS)

    Hesser, W.A.; Madden, M.S.; Pyron, N.M.; Butcher, J.L.

    1994-08-01

    Sites across the US Department (DOE) complex recognize the critical need for a systematic method for prioritizing among their work scope activities. Here at the Hanford Site, Pacific Northwest Laboratory and Westinghouse Hanford Company (WHC) conducted preliminary research into techniques to meet this need and assist managers in making financial resource allocation decisions. This research is a subtask of the risk management task of the Hanford Mission Plan as described in the WHC Integrated Planning Work Breakdown Structure 1.8.2 Fiscal Year 1994 Work Plan. The research team investigated prioritization techniques used at other DOE sites and compared them with the Priority Planning Grid (PPG), a tool used at Hanford. The authors concluded that the PPG could be used for prioritization of resource allocation, but it needed to be revised to better reflect the Site's priorities and objectives. The revised PPG was tested with three Hanford programs, the PPG was modified, and updated procedures were prepared

  19. Developing a Physiotherapy-Specific Preliminary Clinical Decision-Making Tool for Oxygen Titration: A Modified Delphi Study

    Science.gov (United States)

    Duong, Michelle; Bertin, Kendra; Henry, Renee; Singh, Deepti; Timmins, Nolla; Brooks, Dina; Mathur, Sunita

    2014-01-01

    ABSTRACT Purpose: To develop and evaluate a preliminary clinical decision-making tool (CDMT) to assist physiotherapists in titrating oxygen for acutely ill adults in Ontario. Methods: A panel of 14 experienced cardiorespiratory physiotherapists was recruited. Factors relating to oxygen titration were identified using a modified Delphi technique. Four rounds of questionnaires were conducted, during which the goals were to (1) generate factors, (2) reduce factors and debate contentious factors, (3) finalize factors and develop the preliminary CDMT, and (4) evaluate the usability of the tool in a clinical context. Results: The panel reached consensus on a total of 89 factors, which were compiled to create the preliminary CDMT. The global tool reached consensus for sensibility, receiving a mean score of 6/7 on a 7-point Likert-type scale (1=unacceptable; 7=excellent). Five of the nine individual components of evaluation of the tool achieved scores ≥6.0; the remaining four had mean scores between 5.4 and 5.9. Conclusion: This study produced a preliminary CDMT for oxygen titration, which the panel agreed was highly comprehensible and globally sensible. Further research is necessary to evaluate the sensibility and applicability of the tool in a clinical setting. PMID:25125782

  20. Assessment of patient experience with unilateral vocal fold immobility: a preliminary study.

    Science.gov (United States)

    Francis, David O; McKiever, Monique E; Garrett, C Gaelyn; Jacobson, Barbara; Penson, David F

    2014-09-01

    Systematically moving toward patient-centered care for unilateral vocal fold immobility (UVFI) requires comprehensive understanding of the variability of actual patient experiences. This rigorous qualitative study assesses UVFI-related disability and proposes a preliminary taxonomy of UVFI patient experience. (1) Semistructured interviews and (2) taxonomy development. Consecutive UVFI patients presenting July to September, 2012, prospectively underwent open-ended interviews investigating how UVFI affected their quality of life (QOL) and had caused disability. Comments reported by >20% were synthesized into axes based on content similarity. Variables were arranged into a preliminary taxonomy of UVFI patient experience, which was evaluated for four attributes of face validity. The majority of 39 patients had "extensive" baseline voice use (56%) and an iatrogenic etiology (62%). Taxonomy of patient experience included three main axes of symptomatic classification: (1) voice, (2) swallowing, and (3) breathing-all with intrinsic (physical and emotional) and extrinsic (social) subaxes that describe major impacts on QOL. Voice complaints were 100% penetrant, whereas breathing and swallowing symptoms afflicted 76% and 66%, respectively, of interviewees. Of affected patients, solid and liquid dysphagia was experienced by 70% and 63%, respectively. Of dyspneic patients, shortness of breath existed with talking (97%) and exercise (72%). Persistent throat congestion (76%), weakened cough (62%), globus (62%), and dysfunctional valsalva (41%) were frequent. Patient experience with UVFI has been incompletely characterized. This qualitative assessment and preliminary taxonomy highlight several related patient experiences not well documented in the literature or incorporated into currently available metrics. Copyright © 2014 The Voice Foundation. Published by Elsevier Inc. All rights reserved.

  1. Diffusion-weighted MR imaging of cystic lesions of neurocysticercosis: a preliminary study

    International Nuclear Information System (INIS)

    Raffin, Luciana S.; Bacheschi, Luiz A.; Machado, Luis R.; Nobrega, Jose P.S.; Coelho, Christina; Leite, Claudia C.

    2001-01-01

    Neurocysticercosis is an endemic disease in some developing countries. It has pleomorfic clinical and imaging findings, which are variable from patient to patient. In this preliminary note, we studied the magnetic resonance diffusion-weighted images of sixteen patients presenting with cystic lesions of this disease diagnosed by clinical and laboratorial findings. All the lesions had hypointense signal and the similar apparent diffusion coefficient values as the cerebrospinal fluid. (author)

  2. Development of a decommissioning plan for nuclear power plant 'Krsko'

    International Nuclear Information System (INIS)

    Tankosic, Djurica; Fink, Kresimir

    1991-01-01

    Nuclear Power Plant 'Krsko' (NEK), is the only nuclear power plant in Yugoslavia, is a two-loop, Westinghouse-design, pressurized water reactor rated at 632 MWe. When NEK applied for an operating license in 1981, it did not have to explain how the plant would be decommissioned and decommissioning provisions were not part of the licensing process. Faced with mounting opposition to nuclear power and a real threat that the plant would be shut down, the plant management developed a Mission Plan for resolving the decommissioning problem. The Mission Plan calls for a preliminary decommissioning plan to be prepared and submitted to the local regulatory body before the end of 1992

  3. Preliminary studies on the behavioural effects of the methanol ...

    African Journals Online (AJOL)

    The behavioural tests employed were diazepam-induced sleep onset and duration, hole board assay for exploratory activity, mouse beam walk assay for motor coordination, and the staircase test for the detection of anxiolytic compounds. Preliminary phytochemical screening was also carried out on the extract. Results: The ...

  4. Test plan for FY-91 dust control studies

    International Nuclear Information System (INIS)

    Winberg, M.R.

    1991-03-01

    This test plan defines basic test procedures for testing commercially available vendor products as soil fixatives and dust suppression agents to determine their capability to control fugitive dust generation during transuranic waste retrieval and handling operations. A description of the test apparatus and methods are provided in this test plan. This test plan defines the sampling procedures, controls, and analytical methods for the samples collected. Data management is discussed, as well as quality assurance and safety requirements for the study. 6 refs., 5 figs

  5. Preliminary design studies for the DESCARTES and CIDER codes

    International Nuclear Information System (INIS)

    Eslinger, P.W.; Miley, T.B.; Ouderkirk, S.J.; Nichols, W.E.

    1992-12-01

    The Hanford Environmental Dose Reconstruction (HEDR) project is developing several computer codes to model the release and transport of radionuclides into the environment. This preliminary design addresses two of these codes: Dynamic Estimates of Concentrations and Radionuclides in Terrestrial Environments (DESCARTES) and Calculation of Individual Doses from Environmental Radionuclides (CIDER). The DESCARTES code will be used to estimate the concentration of radionuclides in environmental pathways, given the output of the air transport code HATCHET. The CIDER code will use information provided by DESCARTES to estimate the dose received by an individual. This document reports on preliminary design work performed by the code development team to determine if the requirements could be met for Descartes and CIDER. The document contains three major sections: (i) a data flow diagram and discussion for DESCARTES, (ii) a data flow diagram and discussion for CIDER, and (iii) a series of brief statements regarding the design approach required to address each code requirement

  6. A Hybrid 3D Path Planning Method for UAVs

    DEFF Research Database (Denmark)

    Ortiz-Arroyo, Daniel

    2015-01-01

    This paper presents a hybrid method for path planning in 3D spaces. We propose an improvement to a near-optimal 2D off-line algorithm and a flexible normalized on-line fuzzy controller to find shortest paths. Our method, targeted to low altitude domains, is simple and efficient. Our preliminary resu...

  7. Influence of study satisfaction on academic procrastination in psychology students: a preliminary study

    Directory of Open Access Journals (Sweden)

    Sergio Alexis Dominguez-Lara

    2017-06-01

    Full Text Available The aim of this predictive study was to analyze the degree of influence of study satisfaction (SS on academic procrastination (AP. One hundred forty- eight (148 psychology students (111 women between 18 and 32 years old (M = 22.41 were evaluated using the Brief Scale of Study Satisfaction and the Academic Procrastination Scale. After preliminary analyses focused on the scores reliability (α > 0.70 and correlations between dimensions, a regression analysis was performed to determine how much of the variability in the AP dimensions’ scores is explained by the variations in the SS. For that purpose, a method that uses bivariate correlations corrected for attenuation and provides confidence intervals under a bootstrap approach of the associated statistics was applied. All analyses were assessed from an effect size approach. The results indicate that the influence of SS on AP was not significant. These findings provide new ways to implement studies in order to understand the procrastinating behavior in the university setting.

  8. Caligula-Christ: Preliminary Study of a Parallel

    Directory of Open Access Journals (Sweden)

    Lorene M. Birden

    2010-01-01

    Full Text Available Caligula, at the very beginning of the Albert Camus play, conceives a very ambitious project; to surpass the gods and take their place in his empire, in order to decree impossibility. Camus has, however, gone a step further in developing the god-image of his main character through the incorporation of much Christian imagery into the scenes. This aspect of the play seems not to have been noticed by Camus scholars; there is no in-depth study of the use of this imagery. However, Camus scholar Patricia Johnson and the members of the Société des études camusiennes have noted the usefulness of the analysis presented here and the absence of it in previous research. This study, designated as “preliminary,” attempts to prompt further analyses of the question and offers different approaches. It proceeds by intertextual study of Caligula and the gospels (here referred to in Revised Standard Version and brings out aspects of the emperor’s intentions that expose a combination of perversion and similarity in relation to deity. It briefly outlines the sources of this parallel and the reasons for creating it, then details the parallels that show first the reversal of the image of Jesus, then the striking consonance. It ends with interpretations of the parallels and concludes with commentaries on the use of irony to create them.

  9. Technical architecture of ONC-approved plans for statewide health information exchange.

    Science.gov (United States)

    Barrows, Randolph C; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.

  10. Situational analysis: preliminary regional review of the Mental Health Atlas 2014.

    Science.gov (United States)

    Gater, R; Chew, Z; Saeed, K

    2015-09-28

    The WHO comprehensive Mental Health Action Plan 2013-2020 established goals and objectives that Member States have agreed to meet by 2020. To update the Atlas of Mental Health 2011, specific indicators from the Mental Health Action Plan and additional indicators on service coverage were incorporated into the questionnaire for the Atlas 2014. The data will help facilitate improvement in information gathering and focus efforts towards implementation of the Mental Health Action Plan. The questionnaire was completed by the national mental health focal point of each country. This preliminary review seeks to consolidate data from the initial response to the Atlas 2014 questionnaire by Member States in the Eastern Mediterranean Region. Data for this review were analysed for the whole Region, by health systems groupings and by individual countries. Where possible, data are compared with the Mental Health Atlas 2011 to give a longitudinal perspective.

  11. First fuel re-load of Angra-1 reactor - Inspection and hearing plan

    International Nuclear Information System (INIS)

    Pollis, W.; Alvarenga, M.A.B.; Meldonian, N.L.; Paiva, R.L.C. de; Pollis, R.

    1985-01-01

    The plan of inspection and hearing of the first fuel reload of Angra-1 nuclear reactor is detailed. It consists in five steps: receiving and storage of the fuel; reload preparation; activities during; post-reload activities, and preliminary activities. (M.I.)

  12. Hypoallergenic properties of donkey's milk: a preliminary study

    Directory of Open Access Journals (Sweden)

    Silvia Vincenzetti

    2014-06-01

    Full Text Available Cow's milk protein allergy (CMPA is an abnormal immunological response to cow milk proteins, which results in IgE-mediated reactions. The therapeutic strategy to respond to CMPA envisages the total elimination of milk or the administration of cow's milk substitutes. For this reason the use of milk from other mammalian species was tested. Among them, donkey's milk proved to be the best alternative in feeding infants affected by CMPA, since its chemical composition is comparable to human milk. In this work an in vitro study was performed in order to analyze the IgE reactivity to milk protein allergens from cow, donkey and goat. In particular, immunoblotting experiments using sera from milk-allergic and non-allergic adult volunteers were conducted with the aim of verifying the hypoallergenic property of donkey's milk. This study provided a preliminary evidence of the hypoallergenicity of donkey's milk when compared to bovine and goat milk. Considering the obtained results, it would be possible to develop a sensitive diagnostic method for CMPA detection, based on chromatographic and immunoblotting analysis.

  13. Preliminary study about refining wood fuel with torrefaction; Esiselvitys puupolttoaineen jalostamisesta torrefiointitekniikalla

    Energy Technology Data Exchange (ETDEWEB)

    Haemaelaeinen, E.; Heinimoe, J.

    2006-07-01

    The EU has started to reduce greenhouse gases which are the result of using fossil fuels. One way to do this is emission trade. There are plans to generate biofuels to replace non-renewable fuels. These biofuels can be processed with the old equipment in power plants. The advantage of biofuels is that their emission factor of carbon dioxide is agreed to be zero because wood consumes the same amount of carbon dioxide while it grows as it releases in combustion. One of these refined biofuels is torrefied wood. Its characteristics mostly correspond to coal, and it can be used in coal-fired power plants without changing equipment. Torrefaction means, in a manner of speaking, roasting wood in 250-270 deg C in oxygen-free conditions. In this process all the water is removed, as well as some of the volatile gases. The colour of the wood changes to chocolate brown, it gets lighter, does not smoke in combustion, repels water, is pulverized easily and releases only small amounts of particulate emissions. The durability and operating properties of torrefied wood are significantly different compared to the raw material. Torrefied wood also has better properties than e.g. wood coal. Torrefaction has been studied a little, and its combustion on the power plant scale has been tested on a small scale. Torrefied material is difficult and expensive to transport because of its proper-ties, so its density must be raised for transporting, e.g. by pelleting. Torrefaction combined with pelleting is, at its best, would be a competitive alternative when biomass, substituting coal, is processed off-site and transported in bulk by sea. Based on the data collected in this preliminary study it can be estimated that producing torrefied wood fuel in Finland has technical-economical possibilities. However, the application of the torrefaction process to Finnish conditions and domestic raw material demands investment in further studies before moving on to the actual implementation phase. (orig.)

  14. Preliminary Slope Stability Study Using Slope/ W

    International Nuclear Information System (INIS)

    Nazran Harun; Mohd Abd Wahab Yusof; Kamarudin Samuding; Mohd Muzamil Mohd Hashim; Nurul Fairuz Diyana Bahrudin

    2014-01-01

    Analyzing the stability of earth structures is the oldest type of numerical analysis in geotechnical engineering. Limit equilibrium types of analyses for assessing the stability of earth slopes have been in use in geotechnical engineering for many decades. Modern limit equilibrium software is making it possible to handle ever-increasing complexity within an analysis. It is being considered as the potential method in dealing with complex stratigraphy, highly irregular pore-water pressure conditions, various linear and nonlinear shear strength models and almost any kind of slip surface shape. It allows rapid decision making by providing an early indication of the potential suitability of sites based on slope stability analysis. Hence, a preliminary slope stability study has been developed to improve the capacity of Malaysian Nuclear Agency (Nuclear Malaysia) in assessing potential sites for Borehole Disposal for Disused Sealed Radioactive Sources. The results showed that geometry of cross section A-A ' , B-B ' , C-C ' and D-D ' achieved the factor of safety not less than 1.4 and these are deemed acceptable. (author)

  15. Family planning providers' perspectives on family planning service delivery in Ibadan and Kaduna, Nigeria: a qualitative study.

    Science.gov (United States)

    Hebert, Luciana Estelle; Schwandt, Hilary Megan; Boulay, Marc; Skinner, Joanna

    2013-01-01

    In Nigeria, fertility continues to be high and contraceptive prevalence remains low. This study was conducted in order to understand the perceptions of, experiences with and challenges of delivering family planning services in two urban areas of Nigeria from the perspectives of family planning service providers. A qualitative study using 59 in-depth interviews was conducted among family planning providers working in hospitals, primary health centres, clinics, pharmacies and patent medicine vendors in Ibadan and Kaduna, Nigeria. Providers support a mix of individuals and organisations involved in family planning provision, including the government of Nigeria. The Nigerian government's role can take a variety of forms, including providing promotional materials for family planning facilities as well as facilitating training and educational opportunities for providers, since many providers lack basic training in family planning provision. Providers often describe their motivation to provide in terms of the health benefits offered by family planning methods. Few providers engage in any marketing of their services and many providers exclude youth and unmarried individuals from their services. The family planning provider community supports a diverse network of providers, but needs further training and support in order to improve the quality of care and market their services. Adolescents, unmarried individuals and women seeking post-abortion care are vulnerable populations that providers need to be better educated about and trained in how to serve. The perspectives of providers should be considered when designing family planning interventions in urban areas of Nigeria.

  16. Report to Congress on status of emergency response planning for nuclear power plants

    International Nuclear Information System (INIS)

    1981-03-01

    This report responds to a request (Public Law 96-295, Section 109) for the Nuclear Regulatory Commission (NRC) to report to Congress on the status of emergency response planning in support of nuclear power reactors. The report includes information on the status of this planning as well as on the Commission actions relating to emergency preparedness. These actions include a summary of the new regulatory requirements and the preliminary results of two comprehensive Evacuation Time Estimate studies; one requested by the NRC including 50 nuclear power plant sites and one conducted by the Federal Emergency Management Agency (FEMA) for 12 high population density sites. FEMA provided the information in this report on the status of State and local planning, including projected schedules for joint State/county/licensee emergency preparedness exercises. Included as Appendicies are the NRC Emergency Planning Final Regulations, 10 CFR Part 50 (45 FR 55402), the FEMA Proposed Rule, 'Review and Approval of State and Local Radiological Emergency Plans and Preparedness', 44 CFR Part 350 (45 FR 42341) and the NRC/FEMA Memorandums of Understanding

  17. Influence of increment of gantry angle and number of arcs on esophageal volumetric modulated arc therapy planning in Monaco planning system: A planning study

    Directory of Open Access Journals (Sweden)

    L Nithya

    2014-01-01

    Full Text Available The objective of this study was to analyze the influence of the increment of gantry angle and the number of arcs on esophageal volumetric modulated arc therapy plan. All plans were done in Monaco planning system for Elekta Synergy linear accelerator with 80 multileaf collimator (MLC. Volumetric modulated arc therapy (VMAT plans were done with different increment of gantry angle like 15 o , 20 o , 30 o and 40 o . The remaining parameters were similar for all the plans. The results were compared. To compare the plan quality with number of arcs, VMAT plans were done with single and dual arc with increment of gantry angle of 20 o . The dose to gross tumor volume (GTV for 60 Gy and planning target volume (PTV for 48 Gy was compared. The dosimetric parameters D 98% , D 95% , D 50% and D max of GTV were analyzed. The homogeneity index (HI and conformity index (CI of GTV were studied and the dose to 98% and 95% of PTV was analyzed. Maximum dose to spinal cord and planning risk volume of cord (PRV cord was compared. The Volume of lung receiving 10 Gy, 20 Gy and mean dose was analyzed. The volume of heart receiving 30 Gy and 45 Gy was compared. The volume of normal tissue receiving greater than 2 Gy and 5 Gy was compared. The number of monitor units (MU required to deliver the plans were compared. The plan with larger increment of gantry angle proved to be superior to smaller increment of gantry angle plans in terms of dose coverage, HI, CI and normal tissue sparing. The number of arcs did not make any difference in the quality of the plan.

  18. Expression, crystallization and preliminary crystallographic study of GluB from Corynebacterium glutamicum

    International Nuclear Information System (INIS)

    Liu, Qingbo; Li, Defeng; Hu, Yonglin; Wang, Da-Cheng

    2013-01-01

    GluB, a substrate-binding protein from C. glutamicum, was expressed, purified and crystallized, followed by X-ray diffraction data collection and preliminary crystallographic analysis. GluB is a substrate-binding protein (SBP) which participates in the uptake of glutamic acid in Corynebacterium glutamicum, a Gram-positive bacterium. It is part of an ATP-binding cassette (ABC) transporter system. Together with the transmembrane proteins GluC and GluD and the cytoplasmic protein GluA, which couples the hydrolysis of ATP to the translocation of glutamate, they form a highly active glutamate-uptake system. As part of efforts to study the amino-acid metabolism, especially the metabolism of glutamic acid by C. glutamicum, a bacterium that is widely used in the industrial production of glutamic acid, the GluB protein was expressed, purified and crystallized, an X-ray diffraction data set was collected to a resolution of 1.9 Å and preliminary crystallographic analysis was performed. The crystal belonged to space group P3 1 21 or P3 2 21, with unit-cell parameters a = b = 82.50, c = 72.69 Å

  19. The cost of child health inequalities in Aotearoa New Zealand: a preliminary scoping study.

    Science.gov (United States)

    Mills, Clair; Reid, Papaarangi; Vaithianathan, Rhema

    2012-05-28

    Health inequalities have been extensively documented, internationally and in New Zealand. The cost of reducing health inequities is often perceived as high; however, recent international studies suggest the cost of "doing nothing" is itself significant. This study aimed to develop a preliminary estimate of the economic cost of health inequities between Māori (indigenous) and non-Māori children in New Zealand. Standard quantitative epidemiological methods and "cost of illness" methodology were employed, within a Kaupapa Māori theoretical framework. Data were obtained from national data collections held by the New Zealand Health Information Service and other health sector agencies. Preliminary estimates suggest child health inequities between Māori and non-Māori in New Zealand are cost-saving to the health sector. However the societal costs are significant. A conservative "base case" scenario estimate is over $NZ62 million per year, while alternative costing methods yield larger costs of nearly $NZ200 million per annum. The total cost estimate is highly sensitive to the costing method used and Value of Statistical Life applied, as the cost of potentially avoidable deaths of Māori children is the major contributor to this estimate. This preliminary study suggests that health sector spending is skewed towards non-Māori children despite evidence of greater Māori need. Persistent child health inequities result in significant societal economic costs. Eliminating child health inequities, particularly in primary care access, could result in significant economic benefits for New Zealand. However, there are conceptual, ethical and methodological challenges in estimating the economic cost of child health inequities. Re-thinking of traditional economic frameworks and development of more appropriate methodologies is required.

  20. Preliminary plan for case-control crash risk study

    Science.gov (United States)

    2002-01-31

    The goal of the Federal Motor Carrier Safety Administration (FMCSA) is to reduce commercial vehicle-related fatalities and injuries. This is achieved through a thorough understanding of crash characteristics, precursors, and risk factors. This will h...

  1. Preliminary studies of epoxidized palm oil as sizing chemical for carbon fibers

    International Nuclear Information System (INIS)

    Salleh, S.N.M.; Ubaidillah, E.A.E.; Abidin, M.F.Z.

    2010-01-01

    Epoxidized palm oil is derived from palm oil through chemical reaction with peracetic acid. Preliminary studies to coat carbon fibers have shown promising result towards applying natural product in carbon fibre composites. Mechanical studies of sized carbon fibers with epoxidized palm oil showed significant increase in tensile and interfacial shear strength. Surface morphology of sized or coated carbon fibers with epoxidized palm oil reveals clear increase in root means square-roughness (RMS). This indicates the change of the surface topography due to sized or coated carbon fibers with epoxidized palm oil. (author)

  2. A comparative study in disaster planning in selected countries

    Directory of Open Access Journals (Sweden)

    Mahmode M

    2007-11-01

    Full Text Available Background: Assessment of different strategic in disaster planning in selected countries. According to the international report indicating that IRAN is among the seven countries most susceptible to disaster, experiencing 31 known disasters out of 40 in the world, occurrence of 1536 moderate to severe earthquake, during 1370-80 and 712 other disasters at the same period it seems necessary to design a disaster plan."nMethods: This research is a comparative-descriptive and case based study in which the researcher used random sampling process in selecting the statistical society from both developed and developing countries. In this goal oriented research the necessary information are extracted from valid global reports, articles and many questionnaires which were subjected to scientific analysis."nResults: Studying different countries (which includes: Canada, Japan, India, USA, Turkey, Pakistan and Iran shows that there is a direct relationship between the level of countries development and their success in disaster planning and management (including preventive measures and confrontation. In most of the studied countries, decentralized planning caused many professional planners participate in different levels of disaster management which ultimately led to development of efficient and realistic plans which in turn decreased the catastrophic effects of disasters dramatically. The results of the aforementioned countries showed that a balanced approach to disaster plan with investment in prophylactic area is very important."nConclusion: As our country uses a centralized strategy for disaster management which has proven its ineffectiveness, the researcher suggests that we should change our approach in disaster management and let our planners participate from all levels include: provincial, rural and etc. This will led to a reality based planning and using all potential capacities in disaster management. According to this study it will be possible to use

  3. Possession experiences in dissociative identity disorder: a preliminary study.

    Science.gov (United States)

    Ross, Colin A

    2011-01-01

    Dissociative trance disorder, which includes possession experiences, was introduced as a provisional diagnosis requiring further study in the Diagnostic and Statistical Manual of Mental Disorders (4th ed.). Consideration is now being given to including possession experiences within dissociative identity disorder (DID) in the Diagnostic and Statistical Manual of Mental Disorders (5th ed.), which is due to be published in 2013. In order to provide empirical data relevant to the relationship between DID and possession states, I analyzed data on the prevalence of trance, possession states, sleepwalking, and paranormal experiences in 3 large samples: patients with DID from North America; psychiatric outpatients from Shanghai, China; and a general population sample from Winnipeg, Canada. Trance, sleepwalking, paranormal, and possession experiences were much more common in the DID patients than in the 2 comparison samples. The study is preliminary and exploratory in nature because the samples were not matched in any way.

  4. Radiological follow-up of uncemented knee prostheses. Preliminary study

    International Nuclear Information System (INIS)

    Martin Hervas, C.; Gomez Barrena, E.; Marquez Moreno, I.; Calle Yuste, F.; Ordonez Parra, J.M.

    1993-01-01

    The preliminary results of a prospective study of 40 uncemented total knee prostheses (TKP) are presented following a radiological protocol with fluoroscopic control and follow-up of over 2 years. The prosthesis-bone interface and the components alignment were assessed. Several radiological signs were studied to assess this interface with respect to the fixing of the component, but they showed little clinical correlation. Statistical significance (p<0.05, chisquare) was found only in the observation of sclerosis in areas of support for the tibital tray as a reaction of the bone. This radiological follow-up is of interest to determine the evolution of the interface and position of the implant to prevent complications (especially loosening) in patients, particularly those under 60 years old, who represent the group that can most benefit from prosthetic systems with uncemented anchorage because of their life expectation and level of activity. Author

  5. Preliminary Study of RFID System for the LILW Transportation

    International Nuclear Information System (INIS)

    Kim, Dohyung; Lee, Unjang; Choi, Kyusup

    2008-01-01

    Radio-Frequency Identification (RFID) is an automatic identification method, relying on storing and remotely retrieving data using devices called RFID tags or transponders. In Korea, Low-to-Intermediate Level Radioactive Wastes (LILW) are planed to be disposed at Kyeonju disposal repository, and 100,000 LILW drums will be disposed for the first 10 years of disposal. Tracking of these LILW drums is one of the important parts for safe transportation. To track the LILW drums during the transport as well as storage and disposal, RFID can be the prospective method for tracking the LILW drums. In this report, RFID system is introduced to the LILW transport from the generation site to disposal site, and one possible RFID system is suggested as a preliminary study

  6. Planning Study Hospital, Cape Town The Hospital Information at ...

    African Journals Online (AJOL)

    Tile HOspital Information Plan- ning Study ... Hospital, and based on. the Business Systems Plan- ... technology can be of considerable benefit in dealing with these issues. .... coherenr, flexible information systems with a minimum of data.

  7. Preliminary analysis of Greater Sage-grouse reproduction in the Virginia Mountains of northwestern Nevada

    Science.gov (United States)

    Coates, Peter S.; Lockyer, Zachary B.; Farinha, Melissa A.; Sweeney, Joelle M.; Johnson, Valerie M.; Meshriy, Matthew G.; Espinosa, Shawn P.; Delehanty, David J.; Casazza, Michael L.

    2011-01-01

    Relationships between habitat selection and population vital rates of greater sage-grouse (Centrocercus urophasianus; hereafter sage-grouse), recently designated as a candidate species under the Endangered Species Act, within the Great Basin are not well-understood. The growing development of renewable energy infrastructure within areas inhabited by sage-grouse is thought to influence predator and vegetation communities. For example, common ravens (Corvus corax), a synanthropic sage-grouse nest predator, are increasing range-wide and select transmission lines and other tall structures for nesting and perching. In the Virginia Mountains of northwestern Nevada, we collected preliminary information of space-use, habitat selection, and population vital rates during the nesting and brood-rearing period over two years on 56 sage-grouse. Additionally, videography at nest sites (n = 22) was used to identify sage-grouse nest predators. The study area is a potential site for renewable energy developments (i.e., wind and solar), and we plan to continue monitoring this population using a before-after-control-impact study design. The results reported here are preliminary and further data are required before conclusions can be drawn from this population of sage-grouse.

  8. Criteria for safety related nuclear plant operator actions: a preliminary assessment of available data

    International Nuclear Information System (INIS)

    Haas, P.M.; Bott, T.F.

    1982-01-01

    The need for a quantitative data base on the reliability of nuclear power plant operators has long been recognised by human factors and reliability analysts, and the great need for further assessment of operator performance under accident conditions has been dramatically emphasised by the incident at Three Mile Island-2. In the US, an effort has been under way for a number of years to develop a design standard to define when required manual operator action can be accepted as part of a nuclear plant design basis. To provide the necessary data base to support such standards and the necessary quantitative assessment of operator reliability, the US Nuclear Regulatory Commission is sponsoring a study at Oak Ridge National Laboratory to develop the data base. A preliminary assessment, completed in April 1979, concluded that sufficient data from US operating experience did not exist to provide an adequate data base. A programme of research using full-scope nuclear plant simulators and results that are correlated to field data was suggested. That programme was recently initiated. This paper reviews the approach, results and conclusions of the preliminary assessment and summarises the planned research programme of simulator studies. (author)

  9. Entrepreneurs vs. Business Plans: A Study of Practicality and Usefulness

    Directory of Open Access Journals (Sweden)

    Sam PD Anantadjaya

    2013-07-01

    Full Text Available Inhigher education, the topic on business plan is relatively studied in great details to note the importance on formulating business plans. Business plans are regarded as the reference point for business people; managers and members of the board of directors, to really realize the business activities. At least, the topic on business plan, which are discussed and studied in universities, ought to have its own value in the real business operations. Many entrepreneurs, however, face difficulties in formulating structural business plans. Many entrepreneurs may not actually formulate business plans as they are regarded important in many classrooms’ teaching, to provide necessary guidance toward corporate governance, opening up new business units, venture agreements, and/or expansion of business operations. Universities should provide connections between what is discussed in classrooms, and the implementation of such discussions in business practices. This research is intended to seek out relationships between the importance of structural business plans, and the practicality and usefulness of business plans for entrepreneurs in young organizations. The reference point for this research is business portfolio theory, both for individual and organization rational theory. One of such means discussed in this paper is the formulation and development of business plans to attract external funding in supporting the needs toward growth.Keywords: entrepreneur, business plan, university, practicality, usefulness

  10. Perencanaan Sistem Pengelolaan Sampah Terpadu Berbasis Masyarakat (Studi Kasus: Rw 03 Kelurahan Sumurboto Kecamatan Banyumanik Kota Semarang)

    OpenAIRE

    Rachmaningtyas, Syahnaz; Syafrudin, Syafrudin; Siwi Handayani, Dwi

    2015-01-01

    [Integrated Community-Based Solid Waste Management Planning (Case Study: RW 03 Kelurahan Sumurboto Kecamatan Banyumanik)] Integrated community-based solid waste management consisted by preliminary stage and solid waste management planing stage. Preparation stage begun with community preparing by issue emergence, survey, introduction to community, comparative study to KSM Sampangan, and commenced community forum. Planning stage consisted management planing, implementation planning, and post-im...

  11. Entrepreneurs vs. Business Plans: A Study of Practicality and Usefulness

    Directory of Open Access Journals (Sweden)

    Sam PD Anantadjaya

    2007-10-01

    Full Text Available In higher education, the topic on business plan is relatively studied in great details to note the importance on formulating business plans. Business plans are regarded as the reference point for business people; managers and members of the board of directors, to really realize the business activities. At least, the topic on business plan, which are discussed and studied in universities, ought to have its own value in the real business operations. Many entrepreneurs, however, face difficulties in formulating structural business plans. Many entrepreneurs may not actually formulate business plans as they are regarded important in many classrooms’ teaching, to provide necessary guidance toward corporate governance, opening up new business units, venture agreements, and/or expansion of business operations. Universities should provide connections between what is discussed in classrooms, and the implementation of such discussions in business practices. This research is intended to seek out relationships between the importance of structural business plans, and the practicality and usefulness of business plans for entrepreneurs in young organizations. The reference point for this research is business portfolio theory, both for individual and organization rational theory. One of such means discussed in this paper is the formulation and development of business plans to attract external funding in supporting the needs toward growth.

  12. Robot assisted navigated drilling for percutaneous pedicle screw placement: A preliminary animal study

    Directory of Open Access Journals (Sweden)

    Hongwei Wang

    2015-01-01

    Conclusions: The preliminary study supports the view that computer assisted pedicle screw fixation using spinal robot is feasible and the robot can decrease the intraoperative fluoroscopy time during the minimally invasive pedicle screw fixation surgery. As spine robotic surgery is still in its infancy, further research in this field is worthwhile especially the accuracy of spine robot system should be improved.

  13. Preliminary results of a feasibility study for a hard x-ray Kirkpatrick-Baez telescope

    DEFF Research Database (Denmark)

    Joensen, Karsten D.; Gorenstein, Paul; Wood, James L.

    1994-01-01

    the preliminary results of a feasibility study of a multifocus Kirkpatrick-Baez telescope. We conclude that high quality multilayers can be performed on relevant thin large flat substrate with adequate uniformity, and that existing deposition chambers can produce the multilayers at a rate of 0.42 m2 per day, so...

  14. Pad A treatability study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-06-01

    This plan addresses the work to be accomplished by the Pad A Treatability Study Project. The purpose of this project is to investigate potential treatment and separation technologies, identify the best technologies, and to demonstrate by both lab- and pilot-scale demonstration, the most applicable remedial technologies for treating plutonium-contaminated salts at the Pad A site located at the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) a the Idaho National Engineering Laboratory (INEL). The conduct of this project will be supported by other DOE laboratories, universities, and private industries, who will provide support for near-term demonstrations of treatment and separation technologies. The purpose of this long-range planning document is to present the detailed plan for the implementation of the Pad A Treatability Study Project

  15. Assessing Internet addiction using the parsimonious Internet addiction components model - a preliminary study [forthcoming

    OpenAIRE

    Kuss, DJ; Shorter, GW; Van Rooij, AJ; Griffiths, MD; Schoenmakers, T

    2014-01-01

    Internet usage has grown exponentially over the last decade. Research indicates that excessive Internet use can lead to symptoms associated with addiction. To date, assessment of potential Internet addiction has varied regarding populations studied and instruments used, making reliable prevalence estimations difficult. To overcome the present problems a preliminary study was conducted testing a parsimonious Internet addiction components model based on Griffiths’ addiction components (2005), i...

  16. Verification study on technology for preliminary investigation for HLW geological disposal. Part 2. Verification of surface geophysical prospecting through establishing site descriptive models

    International Nuclear Information System (INIS)

    Kondo, Hirofumi; Suzuki, Koichi; Hasegawa, Takuma; Goto, Keiichiro; Yoshimura, Kimitaka; Muramoto, Shigenori

    2012-01-01

    The Yokosuka demonstration and validation project using Yokosuka CRIEPI site has been conducted since FY 2006 as a cooperative research between NUMO (Nuclear Waste Management Organization of Japan) and CRIEPI. The objectives of this project are to examine and to refine the basic methodology of the investigation and assessment of properties of geological environment in the stage of Preliminary Investigation for HLW geological disposal. Within Preliminary Investigation technologies, surface geophysical prospecting is an important means of obtaining information from deep geological environment for planning borehole surveys. In FY 2010, both seismic prospecting (seismic reflection and vertical seismic profiling methods) for obtaining information about geological structure and electromagnetic prospecting (magneto-telluric and time domain electromagnetic methods) for obtaining information about resistivity structure reflecting the distribution of salt water/fresh water boundary to a depth of over several hundred meters were conducted in the Yokosuka CRIEPI site. Through these surveys, the contribution of geophysical prospecting methods in the surface survey stage to improving the reliability of site descriptive models was confirmed. (author)

  17. Rayleigh to Compton ratio scatter tomography applied to breast cancer diagnosis: A preliminary computational study

    International Nuclear Information System (INIS)

    Antoniassi, M.; Conceição, A.L.C.; Poletti, M.E.

    2014-01-01

    In the present work, a tomographic technique based on Rayleigh to Compton scattering ratio (R/C) was studied using computational simulation in order to assess its application to breast cancer diagnosis. In this preliminary study, some parameters that affect the image quality were evaluated, such as: (i) energy beam, (ii) size and glandularity of the breast, and (iii) statistical count noise. The results showed that the R/C contrast increases with increasing photon energy and decreases with increasing glandularity of the sample. The statistical noise showed to be a significant parameter, although the quality of the obtained images was acceptable for a considerable range of noise level. The preliminary results suggest that the R/C tomographic technique has a potential of being applied as a complementary tool in the breast cancer diagnostic. - Highlights: ► A tomographic technique based on Rayleigh to Compton scattering ratio is proposed in order to study breast tissues. ► The Rayleigh to Compton scattering ratio technique is compared with conventional transmission technique. ► The influence of experimental parameters (energy, sample, detection system) is studied

  18. Energy and nuclear power planning study for Armenia

    International Nuclear Information System (INIS)

    2004-07-01

    The Energy and Nuclear Power Planning (ENPP) study for Armenia has been conducted under the technical cooperation programme of the International Atomic Energy Agency (IAEA). The objective of the study was to analyze the electricity demand as part of the total final energy demand in various scenarios of Armenian socioeconomic and technological development, and to develop economically optimized electric generating system expansion plans for meeting the electric power demand, and to assess the role that nuclear energy could play within these optimal programs. The specific objectives of this study were: to define the role that nuclear power could play in the future electricity supply in Armenia, based on a least-cost expansion planning analysis of the country's power system; to analyze the environmental impacts of such a nuclear power development; to evaluate the financial viability of the envisaged nuclear power development program; to train a group of Armenian experts in the use of the IAEA's energy models

  19. Co-opting Science: A preliminary study of how students invoke science in value-laden discussions

    DEFF Research Database (Denmark)

    Nielsen, J. A.

    2012-01-01

    '. As a preliminary step, this study investigated how Danish upper secondary biology students actually interwove science facts and values in socio-scientific discussions. In particular, the focus was the argumentative effects of different ways of blurring the fact-value distinction. The data consisted...

  20. Weldon Spring, Missouri, Raffinate Pits 1, 2, 3, and 4: Preliminary grout development screening studies for in situ waste immobilization

    International Nuclear Information System (INIS)

    McDaniel, E.W.; Gilliam, T.M.; Dole, L.R.; West, G.A.

    1987-04-01

    Results of Oak Ridge National Laboratory's initial support program to develop a preliminary grout formula to solidify in situ the Weldon Spring waste are presented. The screening study developed preliminary formulas based on a simulated composite waste and then tested the formulas on actual waste samples. Future data needs are also discussed. 1 ref., 6 figs., 9 tabs

  1. Approach to operational mine planning: Case study Tamnava West

    Directory of Open Access Journals (Sweden)

    Stevanović Dejan R.

    2014-01-01

    Full Text Available In contemporary mining industry is very difficult to achieve production targets and profit without investing effort in detailed excavation planning. It is especially true for deposits with complex geological structure and production technology, as is the case for many coal mines in Serbia. The majority of coal production is used for generation of electricity in power plant. This fact is the main reason why production objectives of coal mine and power plant are strongly connected. Due to the fluctuation of the coal quality, operational mine planning (as a part of coal homogenization process, is of critical importance for managing successful coal quality control and meeting criteria of power plant. This paper investigates advantage of proper operational planning on coal quality control process and overall production performance. For better understanding case study is conducted on open pit Tamnava West field. Successful operational mine planning is almost impossible without use of modern software packages. For that reason in presented case study operational mine planning is done with Minex software.

  2. Nonlinear integrated resource strategic planning model and case study in China's power sector planning

    International Nuclear Information System (INIS)

    Yuan, Jiahai; Xu, Yan; Kang, Junjie; Zhang, Xingping; Hu, Zheng

    2014-01-01

    In this paper we expand the IRSP (integrated resource strategic planning) model by including the external cost of TPPs (traditional power plants) and popularization cost of EPPs (efficiency power plants) with nonlinear functions. Case studies for power planning in China during 2011–2021 are conducted to show the efficacy of the model. Scenarios are compiled to compare the pathways of power planning under different policies. Results show that: 1) wind power will become competitive with technical learning, but its installation is undesirable when the external cost of coal power is not internalized; 2) the existence of popularization cost will hinder EPPs' (efficiency power plants) deployment and pure market mechanism is not enough to deliver EPPs at socially desirable scale; 3) imposition of progressive emission tax on coal power at an average of 0.15–0.20 RMB/KWh can remedy the market distortion and promote the development of wind power by a significant margin; 4) nuclear power will grow stably when its external cost is set no more than 0.187 RMB per KWh, or 87% of its internal cost. The proposed model can serve as a useful tool for decision support in the process of power planning and policy formulation for national government. - Highlights: • Improve IRSP model by adding nonlinear external and popularization cost. • The model is used to conduct China's power sector planning in 2011–2021. • Simulate the impacts of alternative energy policies on planning results. • The model can be used for joint power sector planning and policy design

  3. 76 FR 17472 - Public Meeting/Notice of Availability, Review, and Comment on Preliminary Alternatives for the...

    Science.gov (United States)

    2011-03-29

    ..., Review, and Comment on Preliminary Alternatives for the Development of an Air Tour Management Plan for... National Park Service, Hawaii Volcanoes National Park and the FAA's Air Tour Management Program. The... National Park, Klauea Visitor Center, 1 Crater Rim Drive, Phoa, Hawaii. Tuesday, April 19, 2011, 5-7 p.m...

  4. Ice condenser experimental plan

    International Nuclear Information System (INIS)

    Kannberg, L.D.; Piepel, G.F.; Owczarski, P.C.; Liebetrau, A.M.

    1986-01-01

    An experimental plan is being developed to validate the computer code ICEDF. The code was developed to estimate the extent of aerosol retention in the ice compartments of pressurized water reactor ice condenser containment systems during severe accidents. The development of the experimental plan began with review of available information on the conditions under which the code will be applied. Computer-generated estimates of thermohydraulic and aerosol conditions entering the ice condenser were evaluated and along with other information, used to generate design criteria. The design criteria have been used for preliminary test assembly design and for generation of statistical test designs. Consideration of the phenomena to be evaluated in the testing program, as well as equipment and measurement limitations, have led to changes in the design criteria and to subsequent changes in the test assembly design and statistical test design. The overall strategy in developing the experimental plan includes iterative generation and evaluation of candidate test designs using computer codes for statistical test design and ICEDF for estimation of experimental results. Estimates of experimental variability made prior to actual testing will be verified by replicate testing at preselected design points

  5. Preliminary Context Analysis of Community Informatics Social ...

    African Journals Online (AJOL)

    Preliminary context analysis is always part of the feasibility study phase in the development of information system for Community Development (CD) purposes. In this paper, a context model and a preliminary context analysis are presented for Social Network Web Application (SNWA) for CD in the Niger Delta region of ...

  6. Microangiographic study of the canine dental tissues: a preliminary report

    International Nuclear Information System (INIS)

    Miyabayashi, T.; Morgan, J.P.

    1987-01-01

    A microangiographic study of the dental tissues was performed on one adult mongrel dog to examine the usefulness of the technique. This preliminary study used 30% wt/vol Micropaque suspension which was perfused into the common carotid arteries. After the complete perfusion, the specimen was fixed into a mixture of 10% buffered neutral formalin solution and 95% ethyl alcohol. The mandibular bone with teeth in situ was decalcified. The specimen was embedded in methyl methacrylate. One mm slab sections were made, and then the microangiographs were made. Adequate filling of arterioles was evident on the microangiographs. This technique is shown to be useful in characterizing the nature of the blood supply to the bone and teeth that might be involved in the pathogenesis of radiation-induced injury in the canine dental and periodontal tissues

  7. A preliminary study on titanium-clay interactions

    International Nuclear Information System (INIS)

    Wersin, P.; Grolimund, D.; Kumpulainen, S.; Brendle, J.; Snellman, M.

    2010-01-01

    bentonite, Opalinus Clay, Illite du Puy) were characterized by XAS. Preliminary results can be summarized as: (1) Natural clay materials contain significant but variable amounts of Ti. The standard purification procedure for bentonites to remove accessories does not or only barely removes Ti. (2) The Ti in the natural clays materials Rokle bentonite, Opalinus Clay, Illite du Puy occurs as microcrystalline TiO 2 (presumably as anatase). On the other hand, the Ti spectra in MX-80 suggest the presence of structural Ti in the smectite, but the evidence is not conclusive so far. (3) The exposure of purified MX-80 to titanium powder at room temperature within a period of five months did not lead to measurable additional Ti in the clay. This was even true for samples exposed to acidic or alkaline conditions where corrosion rates and solubility of Ti are known to be higher. Thereof, the following preliminary conclusions can be drawn: - The Ti content in natural bentonites is concentrated mainly in the so-called clay fraction. Ti occurs therein either as separate small TiO 2 particles (Rokle, Opalinus Clay, Illite du Puy) or as structural Ti. As indicated by the study of Karnland et al. (2006), the properties of natural bentonites are not affected by the presence of Ti. In that study, the bulk properties (swelling pressure, hydraulic conductivity) were very similar for the different bentonites containing variable Ti content, ranging from 0.1 to 4.8 weight % TiO 2 in the purified clay fractions. The transfer rates of Ti from the metallic source, even in reactive powder form, to the clay are very low and no enrichment above background concentrations after several months could be observed. In order to obtain measurable effects, both the corrosion process must be increased and the background concentration must be reduced. Tests with Ti-free clay material at increased temperature are still ongoing and will hopefully enable identification of reacted Ti species. (authors)

  8. Preliminary study of the thermo-hydraulic behaviour of the binary breeder reactor

    International Nuclear Information System (INIS)

    Silveira Luz, M. da; Ferreira, W.J.

    1984-06-01

    Continuing the development of the Binary Breeder Reactor, its physical configuration and the advantages of differents types of spacers are analysed. In order to simulate the thermo-hydraulic behaviour and obtain data for a preliminary evaluation of the core geometry, the COBRA III C code was used to study the effects of the lenght and diameter of the fuel element, the coolant inlet temperature, the system pressure, helicoidal pitch and the pitch to diameter ratio. (Author) [pt

  9. Lancashire and Yorkshire Renewable Energy Planning Study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The central aims of the Lancashire and Yorkshire Renewable Energy Planning Study (LYREPS) are to: identify renewable energy resources in the region and evaluate the opportunities for their deployment; promote a local-level development plan policy framework for the utilisation of renewable energy sources which is fully integrated with established land use and economic development strategies in the region. The availability of the following resources was investigated: landfill gas; municipal and industrial wastes; animal slurry; biomass; straw; active solar; passive solar design; photovoltaics; hydro; and wind. (author)

  10. Preliminary Study of 20 MWth Experiment Power Reactor based on Pebble Bed Reactor

    Science.gov (United States)

    Irwanto, Dwi; Permana, Sidik; Pramuditya, Syeilendra

    2017-07-01

    In this study, preliminary design calculations for experimental small power reactor (20 MWt) based on Pebble Bed Reactor (PBR) are performed. PBR technology chosen due to its advantages in neutronic and safety aspects. Several important parameters, such as fissile enrichment, number of fuel passes, burnup and effective multiplication factor are taken into account in the calculation to find neutronic characteristics of the present reactor design.

  11. Reliability of the Filipino version of the Parent Satisfaction Scale: A preliminary study

    OpenAIRE

    Palad, Yves Y.; Madriaga, Gilbert O.

    2014-01-01

    Parent satisfaction is vital in improving the delivery of paediatric health care. However, there are no linguistically appropriate instruments that measure parent satisfaction among Filipino parents of children receiving occupational therapy, physical therapy, and speech pathology services. This study aimed to provide preliminary information about the reliability of the Filipino version of the Parent Satisfaction Scale (F-PSS). Research procedures included forward- and backward-translation of...

  12. Preliminary results from a study of the double beta decay of 150Nd

    International Nuclear Information System (INIS)

    Perillo, I.M.C.; Chan, Y.D.; Hurley, D.; Lesko, K.T.; McDonald, R.J.; Moorhead, M.E.; Norman, E.B.; Smith, A.R.; Stokstad, R.G.

    1996-01-01

    We report the preliminary results from a study of the double beta decay of 150 Nd to the first 0 + excited state of 150 Sm. Our data consists of 50 days of counting 5 kg of natural Nd 2 O 3 at the LBNL-Oroville low background facility. The deduced lower limit for the half life of this decay mode is 4.9.10 19 years. (orig.)

  13. Preliminary Approach on the Estimation of Ponto-Sarmatic Habitats’ Preservation in NE Romania via Herpetological Indicators

    Directory of Open Access Journals (Sweden)

    Dan Laurentiu STOICA

    2013-02-01

    Full Text Available The present scientific approach proposes a preliminary study on habitat suitability and factors’ influence using the herpetological indicator Vipera ursinii moldavica and is intended to depict well adapted preservation measures for the Ponto-Sarmatic ecosystems in the context of increased human pressure. The primary goal is to establish an impact hierarchy for the controlling factors. The study incorporates various natural and human related factors via correspondence analysis in order to mark out for the most influential ones. The goal is to enhance understanding of variables’ contribution to the process and find appropriate intervention measures as far as the Natura 2000 Management Plans are concerned

  14. Crisis Response Strategy and Crisis Types Suitability: A Preliminary Study on MH370

    OpenAIRE

    Mohamad Ashari Noratikah; Abang Ahmad Dayang Aizza Maisha; Samani Mus Chairil

    2017-01-01

    In time of crisis, the organisation’s tactic in responding to the crisis according to its type/s may significantly affect the organisation’s effort to survive its reputational damages. The study of crisis response strategy (CRS) requires further exploration within the Malaysian context, moreso with the greater and apparent use of social media as a platform for the organisation in crisis to reach out to its stakeholders. This preliminary paper studies the MH370 crisis in light of Coombs [1] Si...

  15. Consensus Treatment Plans for New-Onset Systemic Juvenile Idiopathic Arthritis

    Science.gov (United States)

    DeWitt, Esi Morgan; Kimura, Yukiko; Beukelman, Timothy; Nigrovic, Peter A.; Onel, Karen; Prahalad, Sampath; Schneider, Rayfel; Stoll, Matthew L.; Angeles-Han, Sheila; Milojevic, Diana; Schikler, Kenneth N.; Vehe, Richard K.; Weiss, Jennifer E.; Weiss, Pamela; Ilowite, Norman T.; Wallace, Carol A.

    2012-01-01

    Objective There is wide variation in therapeutic approaches to systemic juvenile idiopathic arthritis (sJIA) among North American rheumatologists. Understanding the comparative effectiveness of the diverse therapeutic options available for treatment of sJIA can result in better health outcomes. The Childhood Arthritis and Rheumatology Research Alliance (CARRA) developed consensus treatment plans and standardized assessment schedules for use in clinical practice to facilitate such studies. Methods Case-based surveys were administered to CARRA members to identify prevailing treatments for new-onset sJIA. A 2-day consensus conference in April 2010 employed modified nominal group technique to formulate preliminary treatment plans and determine important data elements for collection. Follow-up surveys were employed to refine the plans and assess clinical acceptability. Results The initial case-based survey identified significant variability among current treatment approaches for new onset sJIA, underscoring the utility of standardized plans to evaluate comparative effectiveness. We developed four consensus treatment plans for the first 9 months of therapy, as well as case definitions and clinical and laboratory monitoring schedules. The four treatment regimens included glucocorticoids only, or therapy with methotrexate, anakinra or tocilizumab, with or without glucocorticoids. This approach was approved by >78% of CARRA membership. Conclusion Four standardized treatment plans were developed for new-onset sJIA. Coupled with data collection at defined intervals, use of these treatment plans will create the opportunity to evaluate comparative effectiveness in an observational setting to optimize initial management of sJIA. PMID:22290637

  16. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  17. The cost of child health inequalities in Aotearoa New Zealand: a preliminary scoping study

    Directory of Open Access Journals (Sweden)

    Mills Clair

    2012-05-01

    Full Text Available Abstract Background Health inequalities have been extensively documented, internationally and in New Zealand. The cost of reducing health inequities is often perceived as high; however, recent international studies suggest the cost of “doing nothing” is itself significant. This study aimed to develop a preliminary estimate of the economic cost of health inequities between Māori (indigenous and non-Māori children in New Zealand. Methods Standard quantitative epidemiological methods and “cost of illness” methodology were employed, within a Kaupapa Māori theoretical framework. Data were obtained from national data collections held by the New Zealand Health Information Service and other health sector agencies. Results Preliminary estimates suggest child health inequities between Māori and non-Māori in New Zealand are cost-saving to the health sector. However the societal costs are significant. A conservative “base case” scenario estimate is over $NZ62 million per year, while alternative costing methods yield larger costs of nearly $NZ200 million per annum. The total cost estimate is highly sensitive to the costing method used and Value of Statistical Life applied, as the cost of potentially avoidable deaths of Māori children is the major contributor to this estimate. Conclusions This preliminary study suggests that health sector spending is skewed towards non-Māori children despite evidence of greater Māori need. Persistent child health inequities result in significant societal economic costs. Eliminating child health inequities, particularly in primary care access, could result in significant economic benefits for New Zealand. However, there are conceptual, ethical and methodological challenges in estimating the economic cost of child health inequities. Re-thinking of traditional economic frameworks and development of more appropriate methodologies is required.

  18. Succession Planning for Community Colleges: A Study of Best Practices

    Science.gov (United States)

    McMaster, Susan Marie

    2012-01-01

    The purpose of this study is to apply best practices for succession planning to community colleges. Succession planning is relevant to management practices in community colleges because there is a surge in retirements in higher education from the "baby boomer" generation. Community colleges need to implement a succession plan to ensure…

  19. Preliminary Study on the High Efficiency Supercritical Pressure Water-Cooled Reactor for Electricity Generation

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Yoon Yeong; Park, Jong Kyun; Cho, Bong Hyun and others

    2006-01-15

    This research has been performed to introduce a concept of supercritical pressure water cooled reactor(SCWR) in Korea The area of research includes core conceptual design, evaluation of candidate fuel, fluid systems conceptual design with mechanical consideration, preparation of safety analysis code, and construction of supercritical pressure heat transfer test facility, SPHINX, and preliminary test. As a result of the research, a set of tools for the reactor core design has been developed and the conceptual core design with solid moderator was proposed. The direct thermodynamic cycle has been studied to find a optimum design. The safety analysis code has also been adapted to supercritical pressure condition. A supercritical pressure CO2 heat transfer test facility has been constructed and preliminary test proved the facility works as expected. The result of this project will be good basis for the participation in the international collaboration under GIF GEN-IV program and next 5-year mid and long term nuclear research program of MOST. The heat transfer test loop, SPHINX, completed as a result of this project may be used for the power cycle study as well as further heat transfer study for the various geometries.

  20. Phytoremediation of Pharmaceuticals - Preliminary Study

    Czech Academy of Sciences Publication Activity Database

    Kotyza, Jan; Soudek, Petr; Kafka, Z.; Vaněk, Tomáš

    2010-01-01

    Roč. 12, č. 3 (2010), s. 306-316 ISSN 1522-6514 R&D Projects: GA MŠk OC09081; GA MŠk 2B08058 Institutional research plan: CEZ:AV0Z50380511 Keywords : acetaminophen * diclofenac * ibuprofen Subject RIV: DK - Soil Contamination ; De-contamination incl. Pesticides Impact factor: 1.936, year: 2010

  1. THE COMPATIBILITY STUDENT CHOICE OF UNIVERSITY MAJORING; A PRELIMINARY STUDIES

    Directory of Open Access Journals (Sweden)

    Daharnis Daharnis

    2016-06-01

    Full Text Available The continuous improvements in order to optimize the basic education to higher education are still running. Based on that purpose, there are many factors to supporting the students' learning activities success; one of the factors is suitability with majors in university. The purpose of this study is to reveal the condition of the compatibility of students majoring with their interest, then to describe the information when the student choose their majoring. Samples in this study were 122 peoples, taken by random sampling from the Padang State University. Data obtained by distributing questionnaires. The results showed that there are students that their major do not match with their interest (22.13%, only 3.28% of students who feel compatible with their major. This result should be a major concern, particularly for counselor in schools for design counseling services to solve these problems. The result of this study used as a grand tour or a preliminary study for further research.

  2. El prestigi empresarial: Anàlisi a través de les conselleries creuades The business prestige: A preliminary study based on interlocks within companies The business prestige: A preliminary study based on interlocks within companies

    Directory of Open Access Journals (Sweden)

    David Gonzalez-Prieto

    2011-11-01

    Full Text Available Purpose: The literature on interlocked directorate or interlocks has proposed the presence of cross-directors as an influential factor in the prestige of a firm (Mizruchi, 1996. This theory is based on the fact that, by having multiple companies with interlocks within them, major stakeholders of the company ought to have a higher perception of prestige. The aim of this preliminary study is to present an exploratory study and suggest future research lines on this issue. Design/methodology/approach: In a first preliminary study, we evaluate the interlocks network comprising companies belonging to the ranking established by the MERCO report in Spain for the year 2010. This is a well-known ranking of corporate reputation in Spain used in recent articles (Luna & Fernandez, 2010. For further analysis, other variables are considered as being quoted in the Spanish market benchmark index, IBEX 35, and the location of the headquarters.Findings: Significant positive relationship was obtained between the number of directorships shared with other public companies and the perceived prestige that stakeholders perceive from the firm. Similarly, we obtain significant positive correlation between the prestige and being listed on the IBEX 35. Finally, we identified banking, construction and energy sectors as the ones that use interlocking directorates more intensively.Research limitations: The results of this preliminary study show the viability of future studies about prestige and interlocks (Mizruchi, 1996. For the validation of the theory described in this study, it should be replicated in different regions and, with larger samples, to observe the effect that interlocks have on the perception of prestige of the company.Practical implications / Originality/value: This is among the first studies showing the existence of a relationship between interlocks and business prestige. It highlights the importance of the composition of the boards for the perceived prestige

  3. Preliminary study on detection of irradiated foodstuffs from the Romanian market

    International Nuclear Information System (INIS)

    Cutrubinis, Mihalis; Chirita, Daniel; Savu, Diana; Elisabeta Secu, Corina; Mihai, Radu; Secu, Mihai; Ponta, Corneliu

    2007-01-01

    In order to fulfil the European task for market survey in food irradiation the first Romanian laboratory for detection of irradiated foodstuffs was established at IRASM Irradiation Centre. In this preliminary study, a wide range of Romanian food samples (spices, vegetables and meat) gamma irradiated at IRASM have been studied using different detection methods: (1) DNA comet assay, (2) thermoluminescence (TL) and (3) electron spin resonance (ESR) for foodstuffs containing bone or cellulose. The results suggest that there is no general available detection method and there is no perfect detection method. In conclusion, in order to carry out a correct identification of radiation treatment of a food sample it is recommended to use at least two standardised detection methods

  4. Energy and nuclear power planning studies

    International Nuclear Information System (INIS)

    Bennett, L.L.; Molina, P.E.; Mueller, T.

    1990-01-01

    The article focuses on the procedures established by the IAEA for providing assistance to international Member States in conducting studies for the analysis of the economic viability of a nuclear power programme. This article specifically reviews energy and nuclear power planning (ENPP) studies in Algeria, Jordan, and Thailand. It highlights major accomplishments in the context of study objectives and organizations, and the principal lessons learned in the process. 4 figs, 1 tab

  5. 76 FR 19516 - Public Meeting/Notice of Availability, Review, and Comment on Preliminary Alternatives for the...

    Science.gov (United States)

    2011-04-07

    ..., Review, and Comment on Preliminary Alternatives for the Development of an Air Tour Management Plan for... Park Service, Hawaii Volcanoes National Park and the FAA's Air Tour Management Program. This document... Center, 1 Crater Rim Drive. P[amacr]hoa, Hawaii, Tuesday, April 19, 2011, 5-7 p.m., P[amacr]hoa Community...

  6. Tank farm instrumentation and data acquisition/management upgrade plan

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    This plan provides the strategy, implementation, and schedule for upgrading tank farm instrumentation, data acquisition and data management. The focus is on surveillance parameters to verify and maintain tank safety. The criteria do not necessarily constitute mandatory requirements but are based upon engineering judgement and best available information. Schedules reflect preliminary funding for FY95. For out years they are best engineering judgment

  7. Policy Implementation Study on Spatial Planning for Environmental Conflict (Study Location: Rembang Regency)

    Science.gov (United States)

    Kusyuniadi, Indraya

    2018-02-01

    This study aims to see the impact and benefits as an outcome of a policy, where this policy is in the form of spatial planning (Regional Planning). As known RTRW is a product that can be regarded as "the book of development" in every region both in the provincial and regional levels. One of them is as a decision tool for investors (investors) in increasing local development investment, spatial planning (RTRW) is also expected to maintain the environment, in order to support the sustainability of regional development. In reality, there are still many conflicts of interest in the implementation process of regional development, especially between economic and environmental interests. Often the interests of regional sustainability are placed at a lower level (less priority) than investment / economy. Land conversion that is inconsistent with district / city spatial planning RTRW is relatively still occurring, especially for economic purposes. Lack of policy called spatial plan in this case RTRW Province and Regency in responding to existing condition in field. How can a product that is said to be "Scripture" a regional planning is powerless in fulfilling the space for investment in the form of industry, commercial, housing and so forth. There are several results that can be concluded in this study. Basically, the importance of the environment at least can be used as the basis or priority of the main decision makers above economic interests and other politic interests. The current Spatial Plan / RTRW document still holds a big question whether at the time of compilation it follows the norms and rules in a plan (data accuracy, through input process from the community).

  8. Policy Implementation Study on Spatial Planning for Environmental Conflict (Study Location: Rembang Regency

    Directory of Open Access Journals (Sweden)

    Kusyuniadi Indraya

    2018-01-01

    Full Text Available This study aims to see the impact and benefits as an outcome of a policy, where this policy is in the form of spatial planning (Regional Planning. As known RTRW is a product that can be regarded as "the book of development" in every region both in the provincial and regional levels. One of them is as a decision tool for investors (investors in increasing local development investment, spatial planning (RTRW is also expected to maintain the environment, in order to support the sustainability of regional development. In reality, there are still many conflicts of interest in the implementation process of regional development, especially between economic and environmental interests. Often the interests of regional sustainability are placed at a lower level (less priority than investment / economy. Land conversion that is inconsistent with district / city spatial planning RTRW is relatively still occurring, especially for economic purposes. Lack of policy called spatial plan in this case RTRW Province and Regency in responding to existing condition in field. How can a product that is said to be "Scripture" a regional planning is powerless in fulfilling the space for investment in the form of industry, commercial, housing and so forth. There are several results that can be concluded in this study. Basically, the importance of the environment at least can be used as the basis or priority of the main decision makers above economic interests and other politic interests. The current Spatial Plan / RTRW document still holds a big question whether at the time of compilation it follows the norms and rules in a plan (data accuracy, through input process from the community.

  9. Developing guidelines for incorporating managing demand into WSDOT planning and programming: transportation demand management guidance for corridor planning studies.

    Science.gov (United States)

    2016-02-01

    The Washington State Department of Transportation (WSDOT) regional planning programs address current and forecasted deficiencies of State highways through the conduct of corridor studies. This Guidance for the conduct of corridor planning studies is ...

  10. Valuation of provisional and cultural services of a Ramsar site: A preliminary study on Rudrasagar lake, India

    Directory of Open Access Journals (Sweden)

    Moitree Taran

    2017-01-01

    Full Text Available Rudrasagar lake, a Ramsar site in India offers a variety of ecosystem services. The contribution of Rudrasagar lake to the society has not been estimated so far. The preliminary study aims to provide an economic valuation of the provisional and cultural services of the Rudrasagar lake. Official records of revenue collected by the Tourism Department of Tripura and a socio- economic survey was the source of information used in the economic valuation of the lake. The main provisional services provided by the lake are food (aquatic plants and fishes, fuel wood and timber whereas, the cultural services provided were boat raiding and tourism due to its historical importance. The provisioning and cultural services provided by the Rudrasagar lake are 40810 US$ and 33929.33 US$ per year respectively during the period of 2010-2015. The main threats to the wetland identified are increasing silt loads due to deforestation, expansion of agricultural land and land conversion due to population pressure. To alleviate the anthropogenic stress on the lake, better monitoring, planning and management are essential. By proper conservation and management it will be possible to enjoy the provisional and cultural services of the lake in a sustainable way.

  11. AGC-1 Experiment and Final Preliminary Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Robert L. Bratton; Tim Burchell

    2006-08-01

    This report details the experimental plan and design as of the preliminary design review for the Advanced Test Reactor Graphite Creep-1 graphite compressive creep capsule. The capsule will contain five graphite grades that will be irradiated in the Advanced Test Reactor at the Idaho National Laboratory to determine the irradiation induced creep constants. Seven other grades of graphite will be irradiated to determine irradiated physical properties. The capsule will have an irradiation temperature of 900 C and a peak irradiation dose of 5.8 x 10{sup 21} n/cm{sup 2} [E > 0.1 MeV], or 4.2 displacements per atom.

  12. Gender differences in visuospatial planning: an eye movements study.

    Science.gov (United States)

    Cazzato, Valentina; Basso, Demis; Cutini, Simone; Bisiacchi, Patrizia

    2010-01-20

    Gender studies report a male advantage in several visuospatial abilities. Only few studies however, have evaluated differences in visuospatial planning behaviour with regard to gender. This study was aimed at exploring whether gender may affect the choice of cognitive strategies in a visuospatial planning task and, if oculomotor measures could assist in disentangling the cognitive processes involved. A computerised task based on the travelling salesperson problem paradigm, the Maps test, was used to investigate these issues. Participants were required to optimise time and space of a path travelling among a set of sub-goals in a spatially constrained environment. Behavioural results suggest that there are no gender differences in the initial visual processing of the stimuli, but rather during the execution of the plan, with males showing a shorter execution time and a higher path length optimisation than females. Males often showed changes of heuristics during the execution while females seemed to prefer a constant strategy. Moreover, a better performance in behavioural and oculomotor measures seemed to suggest that males are more able than females in either the optimisation of spatial features or the realisation of the planned scheme. Despite inconclusive findings, the results support previous research and provide insight into the level of cognitive processing involved in navigation and planning tasks, with regard to the influence of gender.

  13. Preliminary results in the application of radiobiological models in the evaluation of radiotherapy plans

    International Nuclear Information System (INIS)

    Calderon, Carlos; Napoles, Mysleidis; Asencion, Yudy; Yanes, Yahima; Alfonso, Rodolfo; Gonzalez, Joaquin

    2009-01-01

    Notwithstanding the limitations of radiobiological models in the clinical application, its use is becoming more widespread in order to quantitatively assess the bioequivalence of different regimens of irradiation, the effective comparison between different treatment plans by estimating the probability tumor control (TCP) or the probability of normal tissue complication (NTCP), or solve problems, such as the rescheduling of treatments in case of failure. The response to irradiation in the tissues at risk (OARS) depends on factors such as volume irradiated or its organizational structure and behavior can vary for a given dose distribution. Another important aspect is the sensitivity of these models to the variation of parameters (α, α / β, proliferation, clonogenic density, etc.) Measuring the difference between-subjects. Commercial planning systems do not always possible to estimate the biological response of the OARS and CTV. This study presents an assessment of the results of two applications (free ware) and Albireo Target BIOPLAN Cygnus X1 that calculate statistical parameters of the DVH: equivalent uniform dose (EUD), equivalent biological dose (BED), medium dose and other to estimate TCP (Poisson model) and NTCP (Lyman-Kutcker models-Burman and relative seriality) for the calculation of the objective functions: the probability of uncomplicated control (UTCP) based on generalized EUD (f). We studied the response of both systems to the variation of relevant radiobiological parameters and the shape of the DVH. (Author)

  14. Preliminary results in the application of radiobiological models in the evaluation of radiotherapy plans

    International Nuclear Information System (INIS)

    Calderon, Carlos; Napoles, Mysleidis; Asencion, Yudy; Yanes, Yahima; Alfonso, Rodolfo; Gonzalez Joaquin

    2009-01-01

    Notwithstanding the limitations of radiobiological models in the clinical application, its use is becoming more widespread in order to quantitatively assess the bioequivalence of different regimens of irradiation, the effective comparison between different treatment plans by estimating the probability tumor control (TCP) or the probability of normal tissue complication (NTCP), or solve problems, such as the rescheduling of treatments in case of failure. The response to irradiation in the tissues at risk (OARS) depends on factors such as volume irradiated or its organizational structure and behavior can vary for a given dose distribution. Another important aspect is the sensitivity of these models to the variation of parameters (a, a / β, proliferation, clonogenic density, etc.) Measuring the difference between-subjects. Commercial planning systems do not always possible to estimate the biological response of the OARS and CTV. This study presents an assessment of the results of two applications (free ware) and Albireo Target BIOPLAN Cygnus X1 that calculate statistical parameters of the DVH: equivalent uniform dose (EUD), equivalent biological dose (BED), medium dose and other to estimate TCP (Poisson model) and NTCP (Lyman-models-Kutcker Burman and relative seriality) for the calculation of the objective functions: the probability of uncomplicated control (UTCP) based on generalized EUD (f). We studied the response of both systems to the variation of relevant radiobiological parameters and the shape of the DVH. (author)

  15. PRELIMINARY FACTOR ANALYSIS OF VISUAL COGNITION AND MEMORY. STUDIES IN CINE-PSYCHOMETRY, FINAL REPORT, PART I.

    Science.gov (United States)

    SEIBERT, WARREN F.; AND OTHERS

    PRELIMINARY ANALYSES WERE UNDERTAKEN TO DETERMINE THE POTENTIAL CONTRIBUTION OF MOTION PICTURE FILMS TO FACTOR ANALYTIC STUDIES OF HUMAN INTELLECT. OF PRIMARY CONCERN WERE THE OPERATIONS OF COGNITION AND MEMORY, FORMING TWO OF THE FIVE OPERATION COLUMNS OF GUILFORD'S "STRUCTURE OF INTELLECT." THE CORE REFERENCE FOR THE STUDY WAS DEFINED…

  16. Preliminary study on improving safety culture in Malaysian nuclear industries

    International Nuclear Information System (INIS)

    Ibrahim, Sabariah Kader; Lee, Y. E.

    2012-01-01

    This paper presents preliminary study on safety culture and its implementation in Malaysian nuclear industries by realizing the importance of safety culture; identification of important safety culture attributes; safety culture assessment and the practices to incorporate the identified safety culture attributes in organization. The first section of this paper explains the terms and definitions related to safety culture. Second, for the realization of importance of safety culture in organization, the international operational experiences emphasizing the importance of safety culture are described. Third, important safety culture attributes which are frequently cited in literature are provided. Fourth, methods to assess safety culture in operating organization are described. Finally, the practices to enhance the safety culture in an organization are discussed

  17. Preliminary study on improving safety culture in Malaysian nuclear industries

    Energy Technology Data Exchange (ETDEWEB)

    Ibrahim, Sabariah Kader [KAIST, Daejeon (Korea, Republic of); Lee, Y. E. [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-10-15

    This paper presents preliminary study on safety culture and its implementation in Malaysian nuclear industries by realizing the importance of safety culture; identification of important safety culture attributes; safety culture assessment and the practices to incorporate the identified safety culture attributes in organization. The first section of this paper explains the terms and definitions related to safety culture. Second, for the realization of importance of safety culture in organization, the international operational experiences emphasizing the importance of safety culture are described. Third, important safety culture attributes which are frequently cited in literature are provided. Fourth, methods to assess safety culture in operating organization are described. Finally, the practices to enhance the safety culture in an organization are discussed.

  18. Preliminary Studies Of A Phase Modulation Technique For Measuring Chromaticity

    International Nuclear Information System (INIS)

    Tan, C.-Y.

    2006-01-01

    The classical method for measuring chromaticity is to slowly modulate the RF frequency and then measure the betatron tune excursion. The technique that is discussed in this paper instead modulates the phase of the RF and then the chromaticity is obtained by phase demodulating the betatron tune. This technique requires knowledge of the betatron frequency in real time in order for the phase to be demodulated. Fortunately, the Tevatron has a tune tracker based on the phase locked loop principle which fits this requirement. A preliminary study with this technique has showed that it is a promising method for doing continuous chromaticity measurement and raises the possibility of doing successful chromaticity feedback with it

  19. Preliminary design of a production automation framework for a pyroprocessing facility

    Directory of Open Access Journals (Sweden)

    Moonsoo Shin

    2018-04-01

    Full Text Available Pyroprocessing technology has been regarded as a promising solution for recycling spent fuel in nuclear power plants. The Korea Atomic Energy Research Institute has been studying the current status of equipment and facilities for pyroprocessing and found that existing facilities are manually operated; therefore, their applications have been limited to laboratory scale because of low productivity and safety concerns. To extend the pyroprocessing technology to a commercial scale, the facility, including all the processing equipment and the material-handling devices, should be enhanced in view of automation. In an automated pyroprocessing facility, a supervised control system is needed to handle and manage material flow and associated operations. This article provides a preliminary design of the supervising system for pyroprocessing. In particular, a manufacturing execution system intended for an automated pyroprocessing facility, named Pyroprocessing Execution System, is proposed, by which the overall production process is automated via systematic collaboration with a planning system and a control system. Moreover, a simulation-based prototype system is presented to illustrate the operability of the proposed Pyroprocessing Execution System, and a simulation study to demonstrate the interoperability of the material-handling equipment with processing equipment is also provided. Keywords: Manufacturing Execution System, Material-handling, Production Automation, Production Planning and Control, Pyroprocessing, Pyroprocessing Execution System

  20. Preliminary considerations concerning neutral plasma beam propagation across a magnetic field

    International Nuclear Information System (INIS)

    Shanahan, W.R.; Faehl, R.J.; Godfrey, B.B.

    1979-08-01

    A plan to address physical questions of interest for exoatmospheric military applications of intense neutralized plasma beams is described. After a brief review of earlier work relevant to this matter and a detailed explanation of why such work cannot answer questions of present interest, a plan employing interactive application of several numerical and analytic techniques to treat relevant phenomena occurring on the various rather disparate time and length scales involved is suggested. The first part of the study would determine the macroscopic features of beam propagation through calculations effected with a magnetohydrodynamical numerical code. Classical transport coefficients would be employed in this initial phase. Using information thus gained concerning gross charge and current distributions, particle-in-cell simulations would be initialized to study those microscopic, phase-space-dependent phenomena which can alter the phenomonological transport coefficients appearing in the fluid description. Insight thereby gained concerning anomaous, collectively induced transport effects would then be applied to yield a refined, accurate description of the macroscopic aspects of neutral plasma beam propagation. Personnel and computational resources available at the Los Alamos Scientific Laboratory are described. Results of a very preliminary particle-in-cell simulation of a neutral plasma beam propagating across a magnetic field are presented

  1. Isotope-aided studies of the bioavailability of iron from Myanmar diets

    International Nuclear Information System (INIS)

    Khin Maung Naing; Myo Khin

    1992-01-01

    Iron deficiency is an important nutritional problem in Myanmar. The preliminary studies in this paper are to be used as a feasibility study for an iron fortification programme in Myanmar. This programme is now in the planning stages. This paper contains summaries of information gathered from a dietary survey, isotope-aided studies of the bioavailability of iron from the daily diet, and a work plan for fortifying table salt with iron. 6 refs, 6 tabs

  2. Low-level arsenic exposure via drinking water consumption and female fecundity - A preliminary investigation

    Energy Technology Data Exchange (ETDEWEB)

    Susko, Michele L. [Department of Epidemiology and Biostatistics, University at Albany, State University of New York, Rensselaer, New York (United States); Bloom, Michael S., E-mail: mbloom@albany.edu [Department of Epidemiology and Biostatistics, University at Albany, State University of New York, Rensselaer, New York (United States); Department of Environmental Health Sciences, University at Albany, State University of New York, Rensselaer, New York (United States); Neamtiu, Iulia A. [Health Department, Environmental Health Center, Cluj-Napoca (Romania); IMOGEN Research Institute, Cluj-Napoca (Romania); Appleton, Allison A. [Department of Epidemiology and Biostatistics, University at Albany, State University of New York, Rensselaer, New York (United States); Surdu, Simona [Department of Environmental Health Sciences, University at Albany, State University of New York, Rensselaer, New York (United States); Pop, Cristian [Physico-chemical and Biotoxicological Analysis Laboratory, Environmental Health Center, Cluj-Napoca (Romania); Cluj School of Public Health - College of Political, Administrative and Communication Sciences, Babeș-Bolyai University, Cluj-Napoca (Romania); Faculty of Environmental Science and Engineering, Babeș-Bolyai University, Cluj-Napoca (Romania); Fitzgerald, Edward F. [Department of Epidemiology and Biostatistics, University at Albany, State University of New York, Rensselaer, New York (United States); Department of Environmental Health Sciences, University at Albany, State University of New York, Rensselaer, New York (United States); Anastasiu, Doru [University of Medicine and Pharmacy “Victor Babeș”, Timișoara (Romania); Obstetrics and Gynecology Department of the Emergency County Hospital, Timișoara (Romania); and others

    2017-04-15

    High level arsenic exposure is associated with reproductive toxicity in experimental and observational studies; however, few data exist to assess risks at low levels. Even less data are available to evaluate the impact of low level arsenic exposure on human fecundity. Our aim in this pilot study was a preliminary evaluation of associations between low level drinking water arsenic contamination and female fecundity. This retrospective study was conducted among women previously recruited to a hospital-based case-control study of spontaneous pregnancy loss in Timiá¹£ County, Romania. Women (n=94) with planned pregnancies of 5–20 weeks gestation completed a comprehensive physician-administered study questionnaire and reported the number of menstrual cycles attempting to conceive as the time to pregnancy (TTP). Drinking water samples were collected from residential drinking water sources and we determined arsenic levels using hydride generation-atomic absorption spectrometry (HG-AAS). Multivariable Cox-proportional hazards regression with Efron approximation was employed to evaluate TTP as a function of drinking water arsenic concentrations among planned pregnancies, adjusted for covariates. There was no main effect for drinking water arsenic exposure, yet the conditional probability for pregnancy was modestly lower among arsenic exposed women with longer TTPs, relative to women with shorter TTPs, and relative to unexposed women. For example, 1 µg/L average drinking water arsenic conferred 5%, 8%, and 10% lower likelihoods for pregnancy in the 6th, 9th, and 12th cycles, respectively (P=0.01). While preliminary, our results suggest that low level arsenic contamination in residential drinking water sources may further impair fecundity among women with longer waiting times; however, this hypothesis requires confirmation by a future, more definitive study. - Highlights: • We assessed low level drinking water arsenic as a predictor of fecundability. • Arsenic did

  3. Low-level arsenic exposure via drinking water consumption and female fecundity - A preliminary investigation

    International Nuclear Information System (INIS)

    Susko, Michele L.; Bloom, Michael S.; Neamtiu, Iulia A.; Appleton, Allison A.; Surdu, Simona; Pop, Cristian; Fitzgerald, Edward F.; Anastasiu, Doru

    2017-01-01

    High level arsenic exposure is associated with reproductive toxicity in experimental and observational studies; however, few data exist to assess risks at low levels. Even less data are available to evaluate the impact of low level arsenic exposure on human fecundity. Our aim in this pilot study was a preliminary evaluation of associations between low level drinking water arsenic contamination and female fecundity. This retrospective study was conducted among women previously recruited to a hospital-based case-control study of spontaneous pregnancy loss in Timiá¹£ County, Romania. Women (n=94) with planned pregnancies of 5–20 weeks gestation completed a comprehensive physician-administered study questionnaire and reported the number of menstrual cycles attempting to conceive as the time to pregnancy (TTP). Drinking water samples were collected from residential drinking water sources and we determined arsenic levels using hydride generation-atomic absorption spectrometry (HG-AAS). Multivariable Cox-proportional hazards regression with Efron approximation was employed to evaluate TTP as a function of drinking water arsenic concentrations among planned pregnancies, adjusted for covariates. There was no main effect for drinking water arsenic exposure, yet the conditional probability for pregnancy was modestly lower among arsenic exposed women with longer TTPs, relative to women with shorter TTPs, and relative to unexposed women. For example, 1 µg/L average drinking water arsenic conferred 5%, 8%, and 10% lower likelihoods for pregnancy in the 6th, 9th, and 12th cycles, respectively (P=0.01). While preliminary, our results suggest that low level arsenic contamination in residential drinking water sources may further impair fecundity among women with longer waiting times; however, this hypothesis requires confirmation by a future, more definitive study. - Highlights: • We assessed low level drinking water arsenic as a predictor of fecundability. • Arsenic did

  4. Local adaptation of the National Physical Activity Plan: creation of the Active Living Plan for a Healthier San Antonio.

    Science.gov (United States)

    Esparza, Laura A; Velasquez, Katherine S; Zaharoff, Annette M

    2014-03-01

    Physical inactivity and related health consequences are serious public health threats. Effective strategies to facilitate and support active-living opportunities must be implemented at national, state, and local levels. San Antonio, Texas, health department officials launched the Active Living Council of San Antonio (ALCSA) to engage the community in developing a 3- to 5-year plan to promote active living. A steering committee set preliminary ALCSA aims and established a multisector membership structure modeled after the US National Physical Activity Plan (NPAP). ALCSA adopted governance standards, increased knowledge of physical activity and health, and engaged in an 18-month collaborative master plan writing process. ALCSA selected overarching strategies and evidence-based strategies for each societal sector and adapted strategies to the local context, including tactics, measures of success, and timelines. Community and expert engagement led to a localized plan reflecting national recommendations, the Active Living Plan for a Healthier San Antonio. Multisector collaborations among governmental agencies and community organizations, which were successfully developed in this case to produce the first-ever local adaptation of the NPAP, require clearly defined expectations. Lessons learned in ALCSA's organizational and plan development can serve as a model for future community-driven efforts to increase active living.

  5. A Value Function Approach to Information Operations MOE's: A Preliminary Study

    National Research Council Canada - National Science Library

    Doyle, Michael

    1997-01-01

    A value focused thinking approach is applied to information operations. A preliminary value hierarchy for information operations is constructed by extracting the values of senior military leadership from existing doctrine...

  6. Isotope angiocardiography. Method and preliminary own studies

    Energy Technology Data Exchange (ETDEWEB)

    Stepinska, J; Ruzyllo, W; Konieczny, W [Centrum Medyczne Ksztalcenia Podyplomowego, Warsaw (Poland)

    1979-01-01

    Method of technetium isotope 99 m pass through the heart recording with the aid of radioisotope scanner connected with seriograph and computer is being presented. Preliminary tests were carried out in 26 patients with coronary disease without or with previous myocardial infarction, cardiomyopathy, ventricular septal defect and in patients with artificial mitral and aortic valves. The obtained scans were evaluated qualitatively and compared with performed later contrast X-rays of the heart. Size of the right ventricle, volume and rate of left atrial evacuation, size and contractability of left ventricle were evaluated. Similarity of direct and isotope angiocardiographs, non-invasional character and repeatability of isotope angiocardiography advocate its usefulness.

  7. Modeling and Testing of EVs - Preliminary Study and Laboratory Development

    DEFF Research Database (Denmark)

    Yang, Guang-Ya; Marra, Francesco; Nielsen, Arne Hejde

    2010-01-01

    Electric vehicles (EVs) are expected to play a key role in the future energy management system to stabilize both supply and consumption with the presence of high penetration of renewable generation. A reasonably accurate model of battery is a key element for the study of EVs behavior and the grid...... tests, followed by the suggestions towards a feasible battery model for further studies.......Electric vehicles (EVs) are expected to play a key role in the future energy management system to stabilize both supply and consumption with the presence of high penetration of renewable generation. A reasonably accurate model of battery is a key element for the study of EVs behavior and the grid...... impact at different geographical areas, as well as driving and charging patterns. Electric circuit model is deployed in this work to represent the electrical properties of a lithium-ion battery. This paper reports the preliminary modeling and validation work based on manufacturer data sheet and realistic...

  8. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants.

  9. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    International Nuclear Information System (INIS)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants

  10. Planning strategies for the avoidance of pitfalls in intervention research.

    Science.gov (United States)

    Pruitt, R H; Privette, A B

    2001-08-01

    With the exception of large clinical trials, few studies in nursing and other social sciences test interventions. The discipline of nursing needs to maintain a full range of research designs for continued knowledge development. Intervention research presents unique opportunities and challenges for the novice as well as the seasoned researcher. Some of these methodological challenges include the complex nature of human subjects and interventions, including many factors that interfere with the study variables. Preliminary studies often reveal challenges that may not always be predicted or reflected in research texts. These challenges may be as important as the study results for success in future research efforts. Difficulties encountered in intervention research and suggested strategies for maintaining the integrity of the study are addressed. These challenges include maintaining an adequate sample size, intervention demands, measuring variables, timing issues, and experiencing unexpected events. Strategies presented include the importance of extensive planning, minimizing subject expectations and rewarding efforts, attention to control group members, incorporating retention strategies, expanding knowledge of variables and the study population, preliminary studies as well as anticipating unexpected events. The need for enhanced communication among nurse researchers, educators and clinicians is addressed. In the current health care arena, nurse researchers must understand organizational dynamics and marketing strategies. Collaborative research efforts can increase the visibility of nursing research as well as funding opportunities.

  11. MRI-based brain structure volumes in temporal lobe epilepsy patients and their unaffected siblings: a preliminary study.

    LENUS (Irish Health Repository)

    Scanlon, Cathy

    2013-01-01

    Investigating the heritability of brain structure may be useful in simplifying complicated genetic studies in temporal lobe epilepsy (TLE). A preliminary study is presented to determine if volume deficits of candidate brain structures present at a higher rate in unaffected siblings than controls subjects.

  12. Health effects of smoke from planned burns: a study protocol

    Directory of Open Access Journals (Sweden)

    David O’Keeffe

    2016-02-01

    Full Text Available Abstract Background Large populations are exposed to smoke from bushfires and planned burns. Studies investigating the association between bushfire smoke and health have typically used hospital or ambulance data and been done retrospectively on large populations. The present study is designed to prospectively assess the association between individual level health outcomes and exposure to smoke from planned burns. Methods/design A prospective cohort study will be conducted during a planned burn season in three locations in Victoria (Australia involving 50 adult participants who undergo three rounds of cardiorespiratory medical tests, including measurements for lung inflammation, endothelial function, heart rate variability and markers of inflammation. In addition daily symptoms and twice daily lung function are recorded. Outdoor particulate air pollution is continuously measured during the study period in these locations. The data will be analysed using mixed effect models adjusting for confounders. Discussion Planned burns depend on weather conditions and dryness of ‘fuels’ (i.e. forest. It is potentially possible that no favourable conditions occur during the study period. To reduce the risk of this occurring, three separate locations have been identified as having a high likelihood of planned burn smoke exposure during the study period, with the full study being rolled out in two of these three locations. A limitation of this study is exposure misclassification as outdoor measurements will be conducted as a measure for personal exposures. However this misclassification will be reduced as participants are only eligible if they live in close proximity to the monitors.

  13. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  14. Dynamic Integrated Resource Strategic Planning Model: A Case Study of China’s Power Sector Planning into 2050

    Directory of Open Access Journals (Sweden)

    Yan Xu

    2017-07-01

    Full Text Available This paper proposes a Dynamic Integrated Resource Strategic Planning (DIRSP model based on a semi-Markov decision-making process. Considering the policy transfer probability matrix, we discuss the influence of different policy portfolios and input intensity on the timing and scale of low-carbon transition during the power planning process. In addition, we discuss various planning scenarios from a socio-technical system transition perspective. Scenarios are compiled to compare the pathways of power planning in China during 2015–2050 under different policies, including a typical reproduction pathway with unchanged policy that maintains the original coal-dominated technology pathway, a de-alignment/re-alignment pathway where renewable energy power technologies develop from niches to mainstream while the planning time for peak coal power moves ahead in 10–20 years due to subsidies to renewable and carbon tax policy, and the substitution and reconfiguration pathways in which renewable energy technologies compete with coal power in parallel, in which coal power will peak by 2020 while wind power and solar power will realize large-scale development by 2020 and 2030, respectively. Case study on power planning in China indicates that the methodology proposed in our study can enhance our understanding on the low-carbon transition process and the interaction between energy policy and transition pathway.

  15. Monitor of spatial plans. Feasibility study

    International Nuclear Information System (INIS)

    Bollen, M.J.S.; Ritsema van Eck, J.; Farjon, J.M.J.

    2008-01-01

    The national government needs assessments of consequences of building projects in relation to spatial policy objectives such as the prevention of urban sprawl or the development of landscape qualities. Normally the effects of spatial policies appear after several years. Spatial plans can possibly indicate these effects earlier. To allow policies to be adapted to unwanted developments, the assessments should be available in the early planning stages of these building projects. The Dutch Minister of VROM has asked the Netherlands Environmental Assessment Agency to investigate the feasibility of a monitoring system based on building plans. As building projects take a long period from conception until realization, a monitoring system for these projects should include all plans for the next ten to fifteen years with an indication of the chance that these plans are realized. The existing databases in the Netherlands provide sufficient information to assess consequences of plans for those objectives that are directly related to the urbanization pattern. However, an improvement of these databases is necessary, amongst other things by coordination of these databases [nl

  16. Resection planning for robotic acoustic neuroma surgery

    Science.gov (United States)

    McBrayer, Kepra L.; Wanna, George B.; Dawant, Benoit M.; Balachandran, Ramya; Labadie, Robert F.; Noble, Jack H.

    2016-03-01

    Acoustic neuroma surgery is a procedure in which a benign mass is removed from the Internal Auditory Canal (IAC). Currently this surgical procedure requires manual drilling of the temporal bone followed by exposure and removal of the acoustic neuroma. This procedure is physically and mentally taxing to the surgeon. Our group is working to develop an Acoustic Neuroma Surgery Robot (ANSR) to perform the initial drilling procedure. Planning the ANSR's drilling region using pre-operative CT requires expertise and around 35 minutes' time. We propose an approach for automatically producing a resection plan for the ANSR that would avoid damage to sensitive ear structures and require minimal editing by the surgeon. We first compute an atlas-based segmentation of the mastoid section of the temporal bone, refine it based on the position of anatomical landmarks, and apply a safety margin to the result to produce the automatic resection plan. In experiments with CTs from 9 subjects, our automated process resulted in a resection plan that was verified to be safe in every case. Approximately 2 minutes were required in each case for the surgeon to verify and edit the plan to permit functional access to the IAC. We measured a mean Dice coefficient of 0.99 and surface error of 0.08 mm between the final and automatically proposed plans. These preliminary results indicate that our approach is a viable method for resection planning for the ANSR and drastically reduces the surgeon's planning effort.

  17. A preliminary study on the dielectric constant of WPC based on some tropical woods

    International Nuclear Information System (INIS)

    Chia, L.H.L.; Chua, P.H.; Hon, Y.S.; Lee, E.

    1986-01-01

    The use of WPC as an important insulating material is studied by determining its dielectric constant. The variation of dielectric constant with moisture content is also investigated. Preliminary results show that all untreated woods studied have a higher dielectric constant than their polymer composites with the exception of Kapur and Keruing. It is therefore postulated that the presence of polymers has led to a decrease in the number of polarizable units. Such a material may be useful commercially. (author)

  18. The effect of parental involvement in CBT of anxious children: Preliminary results from a RCT study

    DEFF Research Database (Denmark)

    Esbjørn, Barbara Hoff; Breinholst, Sonja; Reinholdt-Dunne, Marie Louise

    2011-01-01

    Esbjørn, B. H., Breinholst, S., Reinholdt-Dunne, M. L., & Leth, I. (2011). The effect of parental involvement in CBT of anxious children: Preliminary results from a RCT study. Poster accepted for the Association for Behavioral and Cognitive Therapies, Toronto, Canada....

  19. Preliminary safety assessment study for the conceptual design of a repository in tuff at Yucca Mountain

    International Nuclear Information System (INIS)

    Jackson, J.L.; Gram, H.F.; Hong, K.J.; Ng, H.S.; Pendergrass, A.M.

    1984-12-01

    Preliminary estimates of the upper bounds on postulated worst-case radiological releases resulting from possible accidents during the operating period of a prospective repository in tuff at Yucca Mountain are presented. Possible disrupting events are screened to identify the accidents of greatest potential consequence. The radiological dose commitments for the general public and repository personnel are estimated for postulated releases caused by natural phenomena, man-made events, and operational accidents. All postulated worst-case releases result in doses to the public that are lower than the 0.5-rem, whole-body dose-per-accident limit set by the Nuclear Regulatory Commission (NRC) in 10 CFR 60. Doses to repository personnel are within the NRC's 5.0-rem/yr occupational exposure limit set in 10 CFR 20 for normal operations. Doses are within this limit for all accidents except the transportation accident and fire in a drift. A preliminary risk assessment has also been performed. Based on this preliminary safety study, the proposed site boundaries and design criteria routinely used in constructing nuclear facilities appear to be adequate to protect the safety of the general public during the operating phase of the repository

  20. Preliminary hazard classification for Building 107-N

    International Nuclear Information System (INIS)

    Kloster, G.L.; Smith, R.L.

    1997-06-01

    Deactivation activities are planned for Building 107-N (Basin Recirculation Building). This document establishes the preliminary hazard classification (PHC) for the 100-N Area facility segment that includes this building.To establish the PHC, the inventories of radioactive and nonradioactive hazardous materials present within Building 107-N are identified and then compared to the corresponding threshold quantity values in DOE (1992) and reportable quantity values in 40 CFR 302.4. In this evaluation, no credit is taken for the form, location, and dispersibility of the materials; for their interaction with available energy sources; or for safety features that could prevent or mitigate a radioactive release. The result of this effort concluded that the PHC for Building 107-N is Nuclear Category 3

  1. Working together on automated vehicle guidance AVG : preliminary business plan, abridged version.

    NARCIS (Netherlands)

    Awareness (ed.)

    1998-01-01

    This plan describes the questions which will have to be answered in the short term, and the action which need to be taken in a phased and structured manner to gain insight into the potential of automated vehicle guidance (AVG).

  2. Preliminary results on ocean dynamics from Skylab and their implications for future spacecraft

    Science.gov (United States)

    Hayes, J.; Pierson, W. J.; Cardone, V. J.

    1975-01-01

    The instrument aboard Skylab designated S193 - a combined passive and active microwave radar system acting as a radiometer, scatterometer, and altimeter - is used to measure the surface vector wind speeds in the planetary boundary layer over the oceans. Preliminary results corroborate the hypothesis that sea surface winds in the planetary boundary layer can be determined from satellite data. Future spacecraft plans for measuring a geoid with an accuracy up to 10 cm are discussed.

  3. Zero-gravity cloud physics laboratory: Candidate experiments definition and preliminary concept studies

    Science.gov (United States)

    Eaton, L. R.; Greco, R. V.; Hollinden, A. B.

    1973-01-01

    The candidate definition studies on the zero-g cloud physics laboratory are covered. This laboratory will be an independent self-contained shuttle sortie payload. Several critical technology areas have been identified and studied to assure proper consideration in terms of engineering requirements for the final design. Areas include chambers, gas and particle generators, environmental controls, motion controls, change controls, observational techniques, and composition controls. This unique laboratory will allow studies to be performed without mechanical, aerodynamics, electrical, or other type techniques to support the object under study. This report also covers the candidate experiment definitions, chambers and experiment classes, laboratory concepts and plans, special supporting studies, early flight opportunities and payload planning data for overall shuttle payload requirements assessments.

  4. Preliminary study on zinc-carbon battery performance by using neutron tomography

    International Nuclear Information System (INIS)

    Abdul Aziz Mohamed; Nor Abidin Ashari; Mohd Zaid Abdullah; Junita Mohamad Saleh; Azraf Azman; Megat Harun AlRashid Megat Ahmad; Rafhayudi Jamro

    2008-08-01

    This paper describes on the discharging characteristic of zinc-carbon batteries (dry cells) by using a neutron imaging technique called a monochromatic neutron tomography. Experiment was conducted on the Nuclear Malaysia neutron tomography prototype instrument which based on 1-dimensional position sensitive neutron detector. The instrument is constructed at the small angle neutron scattering (SANS) beam line built at the one of the beam ports of TRIGA MARK II Research reactor, Malaysian Nuclear Agency, Bangi, Selangor. The main aim of this preliminary experiment was to test the instrument capability on a real industrial component. It was also aimed to understand structural and chemical changes of these battery particles after experiencing a discharging process. In this preliminary work, new and used batteries used were the products of Eveready company. (Author)

  5. Georgetown University Integrated Community Energy System (GU-ICES). Phase III, Stage II. Preliminary design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-01

    Results are presented for two elements in the Georgetown University ICES program - the installation of a 2500-kW backpressure steam-turbine generator within a new extension to the heating and cooling plant (cogeneration) and the provision of four additional ash silos for the university's atmospheric fluidized-bed boiler plant (added storage scheme). The preliminary design and supporting documentation for the work items and architectural drawings are presented. Section 1 discusses the basis for the report, followed by sections on: feasibility analysis update; preliminary design documents; instrumentation and testing; revised work management plan; and appendices including outline constructions, turbine-generator prepurchase specification, design calculations, cost estimates, and Potomac Electric Company data. (MCW)

  6. Pathology of gastric lesions in donkeys: A preliminary study.

    Science.gov (United States)

    Al-Mokaddem, A K; Ahmed, K A; Doghaim, R E

    2015-11-01

    Donkeys (Equus africanus asinus) are important working animals, particularly in countries where the majority of the population lives below the poverty line. Gastric ulceration has been shown to be common in British donkeys but donkeys from other parts of the world have not been as extensively researched. This study was performed as a preliminary overview of the severity and distribution of gastric lesions in mature donkeys and to document which parasites were present. Descriptive study of pathological findings. Stomachs of 35 mature draught donkeys were examined grossly and histopathology samples taken from 5 regions of the gastric mucosa. Gross examination revealed hyperaemia, oedema, erosions and ulcers in addition to parasitic lesions. Histopathological examination revealed hyperkeratosis, acanthosis, vacuolar degeneration of stratified squamous cells, gastritis, erosions, ulcerations, scarring, hyperactivity of mucus glands, periglandular fibroplasia and parasitic granulomes with infestation by Gasterophilus spp. larvae, Habronema spp. and Draschia megastoma. In donkeys, ulceration of the nonglandular regions of the stomach is more prominent than the glandular regions and parasitic infestations were frequent. © 2014 EVJ Ltd.

  7. Small hydropower station in Lavin - Preliminary study; Kleinwasserkraftwerk Lavin - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Merz, F.

    2008-05-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary study regarding a proposed small hydropower installation on the alpine river Lavinuoz in Lavin, Switzerland. The geographical situation with mountains and glaciers in the catchment area of the proposed hydropower installation is discussed as are the appropriate water catchment installations. Possible dangers caused by avalanches and rock fall are examined. The power to be produced - 5,500,000 kWh/y - by the turbine which is nominally rated at 1350 kW is discussed, as are estimates of production costs. Figures on the investments required and the economic feasibility of the project are discussed, as are environmental factors that are to be taken into account.

  8. SECONDARY WASTE/ETF (EFFLUENT TREATMENT FACILITY) PRELIMINARY PRE-CONCEPTUAL ENGINEERING STUDY

    International Nuclear Information System (INIS)

    May, T.H.; Gehner, P.D.; Stegen, Gary; Hymas, Jay; Pajunen, A.L.; Sexton, Rich; Ramsey, Amy

    2009-01-01

    This pre-conceptual engineering study is intended to assist in supporting the critical decision (CD) 0 milestone by providing a basis for the justification of mission need (JMN) for the handling and disposal of liquid effluents. The ETF baseline strategy, to accommodate (WTP) requirements, calls for a solidification treatment unit (STU) to be added to the ETF to provide the needed additional processing capability. This STU is to process the ETF evaporator concentrate into a cement-based waste form. The cementitious waste will be cast into blocks for curing, storage, and disposal. Tis pre-conceptual engineering study explores this baseline strategy, in addition to other potential alternatives, for meeting the ETF future mission needs. Within each reviewed case study, a technical and facility description is outlined, along with a preliminary cost analysis and the associated risks and benefits.

  9. Preliminary study of sintering of metallic niobium processed for mechanical milling

    International Nuclear Information System (INIS)

    Tamura, H.M.; Vurobi Junior, S.; Cintho, O.M.; Sandim, H.R.Z.; Leite, G.S.

    2010-01-01

    In present study was preliminary study of mechanical milling influence on preparing of metallic niobium powder for sintering. Sample of metallic niobium in powder passing in sieve no. 635 mesh was processed by mechanical milling in SPEX mill for 8 hours using power grinding of 7:1 and a nitrogen atmosphere. The powder was annealed at different temperatures, 900 deg C, 1000 deg C, 1100 deg C and 1200 deg C for 1 hour in an atmosphere of hydrogen and argon to study their crystallization, which then were formed into blank for analysis of the curves compressibility. These samples were also subjected to x-ray diffraction in that their data were compared between the annealing temperatures. We also evaluate the compressibility curves of niobium samples with and without grinding these samples were subjected to x-ray diffraction and fluorescence. (author)

  10. Field study plan for alternate barriers

    International Nuclear Information System (INIS)

    Freeman, H.D.; Gee, G.W.; Relyea, J.F.

    1989-05-01

    Pacific Northwest Laboratory (PNL) is providing technical assistance in selecting, designing, evaluating, and demonstrating protective barriers. As part of this technical assistance effort, asphalt, clay, and chemical grout will be evaluated for use as alternate barriers. The purpose of the subsurface layer is to reduce the likelihood that extreme events (i.e., 100-year maximum storms, etc.) will cause significant drainage through the barrier. The tests on alternate barriers will include laboratory and field analysis of the subsurface layer performance. This field test plan outlines the activities required to test and design subsurface moisture barriers. The test plan covers activities completed in FY 1988 and planned through FY 1992 and includes a field-scale test of one or more of the alternate barriers to demonstrate full-scale application techniques and to provide performance data on a larger scale. Tests on asphalt, clay, and chemical grout were initiated in FY 1988 in small (30.5 cm diameter) tube-layer lysimeters. The parameters used for testing the materials were different for each one. The tests had to take into account the differences in material characteristics and response to change in conditions, as well as information provided by previous studies. 33 refs., 8 figs., 1 tab

  11. Barrier analogs: Long-term performance issues, preliminary studies, and recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Waugh, W.J. [Rust Geotech, Inc., Grand Junction, CO (United States). Environmental Sciences Lab.; Chatters, J.C.; Last, G.V.; Bjornstad, B.N.; Link, S.O. [Pacific Northwest Lab., Richland, WA (United States); Hunter, C.R. [Cascade Earth Sciences, La Grande, OR (United States)

    1994-02-01

    The US Department of Energy`s Hanford Protective Barrier Development Program is funding studies of natural analogs of the long-term performance of waste site covers. Natural-analog studies examine past environments as evidence for projecting the future performance of engineered structures. The information generated by analog studies is needed to (1) evaluate the designs and results of short term experiments and demonstrations, (2) formulate performance-modeling problems that bound expected changes in waste site environments, and (3) understand emergent system attributes that cannot be evaluated with short-term experiments or computer models. Waste site covers will be part of dynamic environmental systems with attributes that transcend the traits of engineered components. This report discusses results of the previously unreported preliminary studies conducted in 1983 and 1984. These results indicate that analogs could play an important role in predicting the long-term behavior of engineered waste covers. Layered exposures of glacial-flood-deposited gravels mantled with silt or sand that resemble contemporary barrier designs were examined. Bergmounds, another anomaly left by cataclysmic glacial floods, were also examined as analogs of surface gravel.

  12. Preliminary study of radioactive waste disposal in granitic underground caves

    International Nuclear Information System (INIS)

    Carvalho, J.F. de; Carajilescov, P.

    1984-01-01

    To date, the disposal of radioactive wastes is one of the major problems faced by the nuclear industry. The utilization of granitic underground caves surrounded by a clay envelope is suggested as a safe alternative for such disposal. A preliminary analysis of the dimensions of those deposits is done. (Author) [pt

  13. Mission Operations Planning with Preferences: An Empirical Study

    Science.gov (United States)

    Bresina, John L.; Khatib, Lina; McGann, Conor

    2006-01-01

    This paper presents an empirical study of some nonexhaustive approaches to optimizing preferences within the context of constraint-based, mixed-initiative planning for mission operations. This work is motivated by the experience of deploying and operating the MAPGEN (Mixed-initiative Activity Plan GENerator) system for the Mars Exploration Rover Mission. Responsiveness to the user is one of the important requirements for MAPGEN, hence, the additional computation time needed to optimize preferences must be kept within reasonabble bounds. This was the primary motivation for studying non-exhaustive optimization approaches. The specific goals of rhe empirical study are to assess the impact on solution quality of two greedy heuristics used in MAPGEN and to assess the improvement gained by applying a linear programming optimization technique to the final solution.

  14. Nonisothermal hydrologic transport experimental plan

    International Nuclear Information System (INIS)

    Rasmussen, T.C.; Evans, D.D.

    1992-09-01

    A field heater experimental plan is presented for investigating hydrologic transport processes in unsaturated fractured rock related to the disposal of high-level radioactive waste (HLW) in an underground repository. The experimental plan provides a methodology for obtaining data required for evaluating conceptual and computer models related to HLW isolation in an environment where significant heat energy is produced. Coupled-process models are currently limited by the lack of validation data appropriate for field scales that incorporate relevant transport processes. Presented in this document is a discussion of previous nonisothermal experiments. Processes expected to dominate heat-driven liquid, vapor, gas, and solute flow during the experiment are explained, and the conceptual model for nonisothermal flow and transport in unsaturated, fractured rock is described. Of particular concern is the ability to confirm the hypothesized conceptual model specifically, the establishment of higher water saturation zones within the host rock around the heat source, and the establishment of countercurrent flow conditions within the host rock near the heat source. Field experimental plans are presented using the Apache Leap Tuff Site to illustrate the implementation of the proposed methodology. Both small-scale preliminary experiments and a long-term experiment are described

  15. TRAC code development status and plans

    International Nuclear Information System (INIS)

    Spore, J.W.; Liles, D.R.; Nelson, R.A.

    1986-01-01

    This report summarizes the characteristics and current status of the TRAC-PF1/MOD1 computer code. Recent error corrections and user-convenience features are described, and several user enhancements are identified. Current plans for the release of the TRAC-PF1/MOD2 computer code and some preliminary MOD2 results are presented. This new version of the TRAC code implements stability-enhancing two-step numerics into the 3-D vessel, using partial vectorization to obtain a code that has run 400% faster than the MOD1 code

  16. Preliminary study of light variations of the eclipsing binary AB Cassiopeiae

    International Nuclear Information System (INIS)

    Ando, H.; Manchester Univ.

    1980-01-01

    Preliminary study of the eclipsing binary AB Cas is presented here by using the photometric observational data. The primary component is one of the delta Sct variables with period of 0.sup(d)054, and whether the oscillation is of a radial mode or of a non-radial one is discussed. Two colour indices (B - V and U - B) data and the light curve analysis suggest that this binary system is a typical Algol type binary system, in which the primary component is near the ZAMS with about 2.3 Msub(sun) and the secondary one is a subgiant star with about 0.5 Msub(sun). (orig.)

  17. Land-use conflicts in The Geysers-Calistoga KGRA: a preliminary study

    Energy Technology Data Exchange (ETDEWEB)

    O' Banion, K.; Hall, C.; Haven, K.

    1979-12-01

    This preliminary study of potential land use conflicts of geothermal development in The Geysers region, one component of the LLL/LBL socioeconomic program, focuses on Lake County because it has most of the undeveloped resource and the least regulatory capability. The land resource is characterized in terms of its ecological, hydrological, agricultural, and recreational value; intrinsic natural hazards; and the adequacy of roads and utility systems and each factor is depicted on a map. Then those factors are analyzed for potential conflicts with both geothermal and urban development and the conflicts displayed on respective maps. A brief review of laws and methods germane to geothermal land-use regulation is included.

  18. Preliminary study of application of Moringa oleifera resin as polymer electrolyte in DSSC solar cells

    Science.gov (United States)

    Saehana, Sahrul; Darsikin, Muslimin

    2016-04-01

    This study reports the preliminary study of application of Moringa oleifera resin as polymer electrolyte in dye-sensitized solar cell (DSSC). We found that polymer electrolyte membrane was formed by using solution casting methods. It is observed that polymer electrolyte was in elastic form and it is very potential to application as DSSC component. Performance of DSSC which employing Moringa oleifera resin was also observed and photovoltaic effect was found.

  19. Care plans and care planning in the management of long-term conditions in the UK: a controlled prospective cohort study.

    Science.gov (United States)

    Reeves, David; Hann, Mark; Rick, Jo; Rowe, Kelly; Small, Nicola; Burt, Jenni; Roland, Martin; Protheroe, Joanne; Blakeman, Tom; Richardson, Gerry; Kennedy, Anne; Bower, Peter

    2014-09-01

    In the UK, the use of care planning and written care plans has been proposed to improve the management of long-term conditions, yet there is limited evidence concerning their uptake and benefits. To explore the implementation of care plans and care planning in the UK and associations with the process and outcome of care. A controlled prospective cohort study among two groups of patients with long-term conditions who were similar in demographic and clinical characteristics, but who were registered with general practices varying in their implementation of care plans and care planning. Implementation of care plans and care planning in general practice was assessed using the 2009-2010 GP Patient Survey, and relationships with patient outcomes (self-management and vitality) were examined using multilevel, mixed effects linear regression modelling. The study recruited 38 practices and 2439 patients. Practices in the two groups (high and low users of written documents) were similar in structural and population characteristics. Patients in the two groups of practices were similar in demographics and baseline health. Patients did demonstrate significant differences in reported experiences of care planning, although the differences were modest. Very few patients in the cohort reported a written plan that could be confirmed. Analysis of outcomes suggested that most patients show limited change over time in vitality and self-management. Variation in the use of care plans at the practice level was very limited and not related to patient outcomes over time. The use of written care plans in patients with long-term conditions is uncommon and unlikely to explain a substantive amount of variation in the process and outcome of care. More proactive efforts at implementation may be required to provide a rigorous test of the potential of care plans and care planning. © British Journal of General Practice 2014.

  20. Plan of measurement experiment of correlation between ion beam and plasma

    Energy Technology Data Exchange (ETDEWEB)

    Oguri, Yoshiyuki; Abe, Satoru; Sakumi, Akira; Okazaki, Hisashi; Watanabe, Takeshi [Tokyo Inst. of Tech. (Japan). Research Lab. for Nuclear Reactors

    1996-12-01

    The Research Laboratory, for Nuclear Reactors, Tokyo Institute of Technology has conducted experimental study on accelerating structure and beam behavior of high intensity heavy ion accelerator for a beam driver and its computer simulation study as a circle of fundamental study of the heavy ion inertial nuclear fusion. From last fiscal year, a preliminary study for measuring the correlation between beam and plasma using low speed heavy ion beam from 1.7 MV tandem accelerator was begun. As a result, a possibility of forming a plasma target with above 10 (exp 17)/cu cm in free electron density and about 100 ns in life possible to supply to measurement of the correlation between beam and plasma was obtained by formation of laser plasma target and development of diagnostic measurement system. According to the preliminary calculation, it is expected to be larger charging state of ion passing through plasma than that in normal temperature target, and stoppability is presumed to increase largely and to apply to electron stopper for accelerator. And, a plan of time resolution measurement of energy loss of beam passed through plasma target using magnetic field type spectrometer and high speed plastic scintillator is also preceeding. (G.K.)

  1. NASA plan for international crustal dynamics studies

    Science.gov (United States)

    1979-01-01

    The international activities being planned as part of the NASA geodynamics program are described. Methods of studying the Earth's crustal movements and deformation characteristics are discussed. The significance of the eventual formalations of earthquake predictions methods is also discussed.

  2. Integrated planning for regional development planning and water resources management under uncertainty: A case study of Xining, China

    Science.gov (United States)

    Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.

    2017-11-01

    Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.

  3. Clinical and neuroimaging correlates of antiphospholipid antibodies in multiple sclerosis: a preliminary study

    Directory of Open Access Journals (Sweden)

    Gonzalez-Toledo Eduardo

    2007-10-01

    Full Text Available Abstract Background The presence of antiphospholipid antibodies (APLA in multiple sclerosis (MS patients has been reported frequently but no clear relationship between APLA and the clinical and neuroimaging features of MS have heretofore been shown. We assessed the clinical and neuroimaging features of MS patients with plasma APLA. Methods A consecutive cohort of 24 subjects with relapsing-remitting (RR MS were studied of whom 7 were in remission (Rem and 17 in exacerbation (Exc. All subjects were examined and underwent MRI of brain. Patients' plasma was tested by standard ELISA for the presence of both IgM and IgG antibodies using a panel of 6 targets: cardiolipin (CL, β2 glycoprotein I (β2GPI, Factor VII/VIIa (FVIIa, phosphatidylcholine (PC, phosphatidylserine (PS and phosphatidylethanolamine (PE. Results In exacerbation up to 80% of MS subjects had elevated titers of IgM antibodies directed against the above antigens. However, in remission, less than half of MS patients had elevated titers of IgM antibodies against one or more of the above antigens. This difference was significant, p Conclusion The findings of this preliminary study show that increased APLA IgM is associated with exacerbations of MS. Currently, the significance of this association in pathogenesis of MS remains unknown. However, systematic longitudinal studies to measure APLA in larger cohorts of patients with relapsing-remitting MS, particularly before and after treatment with immunomodulatory agents, are needed to confirm these preliminary findings.

  4. Naphtha interaction with bitumen and clays : a preliminary study

    Energy Technology Data Exchange (ETDEWEB)

    Afara, M.; Munoz, V.; Mikula, R. [Natural Resources Canada, Devon, AB (Canada). CANMET Western Research Centre

    2010-07-01

    This PowerPoint presentation described a preliminary study conducted to characterize naphtha interactions with bitumen and clays. Coarse tailings, fluid-fine tailings, and froth treatment tailings are produced as a result of surface mine oil sands operations. Solvents are used to produce the bitumens, but the actual fraction of the solvent that evaporates and contributes to VOCs from tailing ponds is poorly understood. This study examined the interactions between the solvent, bitumen and mineral components in froth treatment tails. The study was conducted with aim of quantifying the VOC or solvent escaping from the froth treatment tailings. Samples containing bitumen, clay, a bitumen-clay mixture, or MFT were spiked with 3000 ppm of solvent. The amount of naphtha released was monitored by gas chromatography, mass spectrometry, and flame ionization detection of the evolved gases. The results were expressed as a percentage of the total hydrocarbon peak area of the sample versus a control. Results of the study showed that the naphtha interacted more strongly with the bitumen than with kaolinite and the clay minerals from the oil sands. Although initial solvent evaporation was reduced in the presence of bitumens and clays, long-term solvent releases will need to be quantified. tabs., figs.

  5. Using Iterative Plan-Do-Study-Act Cycles to Improve Teaching Pedagogy.

    Science.gov (United States)

    Murray, Elizabeth J

    2018-01-15

    Most students entering nursing programs today are members of Generation Y or the Millennial generation, and they learn differently than previous generations. Nurse educators must consider implementing innovative teaching strategies that appeal to the newest generation of learners. The Plan-Do-Study-Act cycle is a framework that can be helpful when planning, assessing, and continually improving teaching pedagogy. This article describes the use of iterative Plan-Do-Study-Act cycles to implement a change in teaching pedagogy.

  6. Preliminary Monthly Climatological Summaries

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Preliminary Local Climatological Data, recorded since 1970 on Weather Burean Form 1030 and then National Weather Service Form F-6. The preliminary climate data pages...

  7. Gas cooled fast reactor 2400 MWTh, status on the conceptual design studies and preliminary safety analysis

    International Nuclear Information System (INIS)

    Malo, J.Y.; Alpy, N.; Bentivoglio, F.

    2009-01-01

    The Gas cooled Fast Reactor (GFR) is considered by the French Commissariat a l'Energie Atomique as a promising concept, combining the benefits of fast spectrum and high temperature, using Helium as coolant. A status on the GFR preliminary viability was made at the end of 2007, ending the pre-conceptual design phase. A consistent overall systems arrangement was proposed and a preliminary safety analysis based on operating transient calculations and a simplified PSA had established a global confidence in the feasibility and safety of this baseline concept. Its potential for attractive performances had been pointed out. Compare to the more mature Sodium Fast Reactor technology, no demonstrator has ever been built and the feasibility demonstration will required a longer lead time. The next main project milestone is related to the GFR viability, scheduled in 2012. The current studies consist in revisiting the reactor reference design options as selected at the end of 2007. Most of them are being consolidated by going more in depth in the analysis. Some possible alternatives are assessed. The paper will give a status on the last studies performed on the core design and corresponding neutronics and cycle performance, the Decay Heat Removal strategy and preliminary safety analysis, systems design and balance of plant... This paper is complementary to the Icapp'09 papers 9062 dealing with the Gas cooled Fast Reactor Demonstrator ALLEGRO and 9378 related to GFR transients analysis. (author)

  8. A preliminary study of synchrotron light sources for x-ray lithography

    International Nuclear Information System (INIS)

    Hoffmann, C.R.; Bigham, C.B.; Ebrahim, N.A.; Sawicki, J.A.; Taylor, T.

    1989-02-01

    A preliminary study of synchrotron light sources has been made, primarily oriented toward x-ray lithography. X-ray lithography is being pursued vigorously in several countries, with a goal of manufacturing high-density computer chips (0.25 μm feature sizes), and may attain commercial success in the next decade. Many other applications of soft x-rays appear worthy of investigation as well. The study group visited synchrotron radiation facilities and had discussions with members of the synchrotron radiation community, particularly Canadians. It concluded that accelerator technology for a conventional synchrotron light source appropriate for x-ray lithography is well established and is consistent with skills and experience at Chalk River Nuclear Laboratories. Compact superconducting systems are being developed also. Their technical requirements overlap with capabilities at Chalk River. (32 refs)

  9. Tracking the Short Term Planning (STP) Development Process

    Science.gov (United States)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  10. A Preliminary Study of Gene Polymorphisms Involved in the Neurotransmitters Metabolism of a Homogeneous Spanish Autistic Group

    Science.gov (United States)

    Calahorro, Fernando; Alejandre, Encarna; Anaya, Nuria; Guijarro, Teresa; Sanz, Yolanza; Romero, Auxiliadora; Tienda, Pilar; Burgos, Rafael; Gay, Eudoxia; Sanchez, Vicente; Ruiz-Rubio, Manuel

    2009-01-01

    Twin studies have shown a strong genetic component for autism. Neurotransmitters, such as serotonin and catecholamines, have been suggested to play a role in the disease since they have an essential function in synaptogenesis and brain development. In this preliminary study, polymorphism of genes implicated in the serotonergic and dopaminergic…

  11. Investigation and study on each technique and example of intelligent planning; Intelligent planning no kakushu shuho to jirei ni kansuru chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-11

    Various problems on intelligent planning (IP) and the tendency of basic technology were investigated. For each technique of IP, a Petri net and mark graph have been widely used as the modeling and analysis methods of a discrete event system. Moreover, various planning problems were modeled by a traveling salesman problem, and the efficient solution of the traveling salesman problem has been studied simultaneously. The tendency of the basic technology and application system viewed from an example of intelligent plant planning was investigated as an applied field of planning technology, with importance attached to the production system and robot planning. In the scheduling technology of the production system, the activation of an AI study and a new theory (i.e., architecture study) based on natural science information was investigated with the transition in the world as a trigger. A robot system has been planned in a wide range such as the environmental information acquisition planning of a robot. 202 refs., 69 figs., 4 tabs.

  12. Attitudes and awareness of web-based self-care resources in the military: a preliminary survey study.

    Science.gov (United States)

    Luxton, David D; Armstrong, Christina M; Fantelli, Emily E; Thomas, Elissa K

    2011-09-01

    Web-based self-care resources have a number of potential benefits for military service members (SMs) and their families such as convenience, anonymity, and immediate 24/7 access to useful information. There is limited data available, however, regarding SM and military healthcare provider use of online self-care resources. Our goal with this study was to conduct a preliminary survey assessment of self-care Web site awareness, general attitudes about use, and usage behaviors of Web-based self-care resources among SMs and military healthcare providers. Results show that the majority of SMs and providers use the Internet often, use Internet self-care resources, and are willing to use additional Web-based resources and capabilities. SMs and providers also indicated a preference for Web-based self-care resources as adjunct tools to face-to-face/in-person care. Data from this preliminary study are useful for informing additional research and best practices for integrating Web-based self-care for the military community.

  13. Preliminary study of the 129I distribution in environment of La Hague reprocessing plant with the help of a terrestrial moss: Homalotecium sericeum. Study report

    International Nuclear Information System (INIS)

    1999-01-01

    The preliminary study of the 129 I distribution has allowed to underline the limits of use of a Homalotecium sericeum type terrestrial moss as biological indicator. However, this preliminary study allowed all the same to give a spatial distribution of this radioelement around La Hague reprocessing plant (source term) that underlines the existence of four geographic areas in function of collected activities. The levels are generally under 99 Bq/kg dry. It is recommended to improve the knowledge that we can have of transfers and quantity of iodine 129 from the marine environment to the terrestrial environment, but also, the one that we can have of factors able to modify the spatial distribution of this radionuclide. (N.C.)

  14. Epidemiological studies of Fukushima residents exposed to ionising radiation from the Fukushima Daiichi Nuclear Power Plant prefecture—a preliminary review of current plans

    International Nuclear Information System (INIS)

    Akiba, Suminori

    2012-01-01

    It is now more than six months since the beginning of the accident on 11 March 2011 at the Fukushima Daiichi Nuclear Power Plant in Japan. The Japanese government and local health authorities have started to collect the information necessary to estimate radiation doses received by those living in the area around the plant, drafted plans for the health care of residents, and started to implement some of them. This paper reviews and discusses the studies necessary for risk evaluation of cancer and non-cancer diseases, including those already planned, mainly from the view point of evaluating health risk using epidemiological approaches. In the long run, it is important to establish a cohort with a control group. Even if the cumulative doses are estimated to be so low that it is difficult to evaluate the risk of cancer and non-cancer diseases, it is necessary to conduct such a study to reassure residents. The health care programme of the Fukushima Prefecture government, including health check-ups of residents, will help to assess indirect effects of radiation exposure, including psychological problems. The success of any studies of radiation epidemiology depends on the collection of accurate information on radiation doses received by the study subjects. However, some of the dosimetry surveys were not conducted in a timely manner. (It should be recognised, though, that such a problem might have been inevitable, considering the chaotic condition after the nuclear accident.) Accurate estimation of the radiation dose received by each resident is not only important for scientific risk evaluation but also to inform each resident about his or her potential risk. Otherwise, residents will bear an undue psychological burden from uncertainties regarding their radiation exposure and its health consequences. One of other important tasks in Fukushima is the improvement of the quality of the regional cancer registry in this prefecture. It is also important to start thyroid cancer

  15. Waste Feed Delivery System Phase 1 Preliminary RAM Analysis [SEC 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    DYKES, A.A.

    2000-10-11

    This report presents the updated results of the preliminary reliability, availability, and maintainability (RAM) analysis of selected waste feed delivery (WFD) operations to be performed by the Tank Farm Contractor (TFC) during Phase I activities in support of the Waste Treatment and Immobilization Plant (WTP). For planning purposes, waste feed tanks are being divided into five classes in accordance with the type of waste in each tank and the activities required to retrieve, qualify, and transfer waste feed. This report reflects the baseline design and operating concept, as of the beginning of Fiscal Year 2000, for the delivery of feed from three of these classes, represented by source tanks 241-AN-102, 241-AZ-101 and 241-AN-105. The preliminary RAM analysis quantifies the potential schedule delay associated with operations and maintenance (OBM) field activities needed to accomplish these operations. The RAM analysis is preliminary because the system design, process definition, and activity planning are in a state of evolution. The results are being used to support the continuing development of an O&M Concept tailored to the unique requirements of the WFD Program, which is being documented in various volumes of the Waste Feed Delivery Technical Basis (Carlson. 1999, Rasmussen 1999, and Orme 2000). The waste feed provided to the WTP must: (1) meet limits for chemical and radioactive constituents based on pre-established compositional envelopes (i.e., feed quality); (2) be in acceptable quantities within a prescribed sequence to meet feed quantities; and (3) meet schedule requirements (i.e., feed timing). In the absence of new criteria related to acceptable schedule performance due to the termination of the TWRS Privatization Contract, the original criteria from the Tank Waste Remediation System (77443s) Privatization Contract (DOE 1998) will continue to be used for this analysis.

  16. Leadership and productivity in planning organizations: a case study.

    Science.gov (United States)

    Whitcomb, G R; Williams, E G

    1978-01-01

    This paper presents the findings of a case study dealing mainly with the effects of two divergent leadership styles on the productivity of a planning organization. Changes in various kinds of participation in the agency's activities--an important side effect--are also linked to the two leadership patterns. The agency studied, a private health and welfare council in a medium-sized American city, varied considerably in its output of planning activities and decision making depending on whether it had a participative or a directive leader. The results indicated that there was a trade-off between such highly revered social values as leadership and the extent of participation by staff, board members, and local agency administrators. Implications focus on ways to achieve diversity in communication style among managers and the role of productivity measures in determining the overall effectiveness of planning agencies.

  17. SPANISH MULTICENTRIC STUDY ABOUT NUTRITION-INFLAMATIONhn WITH MID DILUTION (ENIMID STUDY: PRELIMINARY RESULTS

    Directory of Open Access Journals (Sweden)

    Barril G

    2012-06-01

    CONCLUSIONS: 1-The preliminary results show that MidDilution provides a good removal of small and middle molecules, increases appetite by providing a proper balance of cytokines through stimulation of antiinflamatory ones and neuropeptide Y. 2-It provides an improvement of body composition. Finally MidDilution improves nutritional parameters which leads to a better quality of life, as well as physical and mental status.

  18. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  19. Preliminary Feasibility Study on the Construction of Steel Hot Cell Facility for Precise Manipulated Examinations

    International Nuclear Information System (INIS)

    Ahn, Sangbok; Kwon, Hyungmun; Kim, Heemoon; Kim, Dosik; Min, Duckkee; Hong, Kwonpyo

    2006-01-01

    Hot laboratory is essential facility to research and develop in the nuclear industries to examine radioactive materials. The post irradiation examinations for irradiated fuels and materials should be mainly conducted in the hot cell facility to protect radiations to operators. Hot cells are divided into a concrete hot cell and a steel hot cell according to the wall materials. Usually a concrete hot cell is applied to test for high level radioactive materials like as a fuel assembly, rods, and large structure specimens, and a steel hot cell for comparatively lower level activity materials in fuel fragments, and small structural materials. A steel hot cell has many benefits in a specimen manipulation, construction and maintenance costs. In recent the test for the irradiated materials is more frequently required a small and precise manipulating examination for higher degree tests of research and developments. Unfortunately hot laboratory facilities in domestics have mainly constituted of concrete hot cells, and not ready for techniques in steel hot cells. In this paper the construction feasibility of steel hot cell facility is preliminary reviewed in the points of the status of domestic facilities, the test demand prospect and detailed plans

  20. Preliminary Neutronics Design Studies for a Molten Salt Blanket LIFE Engine

    International Nuclear Information System (INIS)

    Powers, J.

    2008-01-01

    The Laser Inertial Confinement Fusion Fission Energy (LIFE) Program being developed at Lawrence Livermore National Laboratory (LLNL) aims to design a hybrid fission-fusion subcritical nuclear engine that uses a laser-driven Inertial Confinement Fusion (ICF) system to drive a subcritical fission blanket. This combined fusion-fission hybrid system could be used for generating electricity, material transmutation or incineration, or other applications. LIFE does not require enriched fuel since it is a sub-critical system and LIFE can sustain power operation beyond the burnup levels at which typical fission reactors need to be refueled. In light of these factors, numerous options have been suggested and are being investigated. Options being investigated include fueling LIFE engines with spent nuclear fuel to aid in disposal/incineration of commercial spent nuclear fuel or using depleted uranium or thorium fueled options to enhance proliferation resistance and utilize non-fissile materials (1]. LIFE engine blanket designs using a molten salt fuel system represent one area of investigation. Possible applications of a LIFE engine with a molten salt blanket include uses as a spent nuclear fuel burner, fissile fuel breeding platform, and providing a backup alternative to other LIFE engine blanket designs using TRISO fuel particles in case the TRISO particles are found to be unable to withstand the irradiation they will be subjected to. These molten salts consist of a mixture of LiF with UF 4 or ThF 4 or some combination thereof. Future systems could look at using PuF 3 or PuF 4 as well, though no work on such system with initial plutonium loadings has been performed for studies documented in this report. The purpose of this report is to document preliminary neutronics design studies performed to support the development of a molten salt blanket LIFE engine option, as part of the LIFE Program being performed at Lawrence Livermore National laboratory. Preliminary design studies