WorldWideScience

Sample records for preliminary draft environmental

  1. Site Study Plan for background environmental radioactivity, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Background Environmental Radioactivity Site Study Plan describes a field program consisting of an initial radiological survey and a radiological sampling program. The field program includes measurement of direct radiation and collection and analysis of background radioactivity samples of air, precipitation, soil, water, milk, pasture grass, food crops, meat, poultry, game, and eggs. The plan describes for each study: the need for the study, the study design, data management and use, schedule of proposed activities, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project (SRP) Requirements Document. 50 refs., 11 figs., 7 tabs

  2. Environmental impact report (draft)

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

  3. Technical procedures for implementation of acoustics site studies, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-09-01

    The purpose and scope of the technical procedure for processing data from the tethered meteorological system are covered. Definitions, interfaces, and concurrent data needs are also addressed. This technical procedure describes how to control, organize, verify, and archive tethered meteorological system data. These data will be received at the processing location from the field measurement location and are part of the characterization of the Deaf Smith County Site, Texas for the salt repository program. These measurements will be made in support of the sound propagation study and are a result of environmental data requirements for acoustics. 6 refs., 15 figs., 5 tabs

  4. 10 CFR 51.74 - Distribution of draft environmental impact statement and supplement to draft environmental impact...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... Impact Statements § 51.74 Distribution of draft environmental impact statement and supplement to draft...

  5. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Science.gov (United States)

    2010-01-07

    ...The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions. This Federal Register notice is intended to provide an opportunity for public comment on the draft recommended interim PRGs. EPA will consider any public comments submitted in accordance with this notice and may revise the draft recommended interim PRGs thereafter.

  6. 76 FR 381 - Notice of Availability of the Draft Environmental Impact Statement/Draft Environmental Impact...

    Science.gov (United States)

    2011-01-04

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Draft Environmental Impact Statement (EIS), and Draft Environmental Impact Report (EIR) as a joint environmental analysis document for the Iberdrola Renewable/Pacific Wind Development Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the opening of the comment period on the Draft EIS/EIR.

  7. 76 FR 62087 - Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas

    Science.gov (United States)

    2011-10-06

    ...] Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas AGENCY: Fish... draft Texas Conservation Plan for the Dunes Sagebrush Lizard (TCP). The draft TCP will function as a... the Applicant for the dunes sagebrush lizard (Sceloporus arenicolus) throughout its range in Texas...

  8. 76 FR 34097 - Notice of Availability of the Draft Environmental Impact Statement, Including a Draft...

    Science.gov (United States)

    2011-06-10

    ... Impact Statement, Including a Draft Programmatic Agreement, for the Clark, Lincoln, and White Pine...) has prepared a Draft Environmental Impact Statement (EIS) and a Draft Programmatic Agreement (PA.... 100 N., Nephi Beaver Library, 55 W. Center St., Beaver. The Draft EIS describes and analyzes SNWA's...

  9. 75 FR 63519 - Notice of Availability of Draft Environmental Assessment and Draft Finding of No Significant...

    Science.gov (United States)

    2010-10-15

    ... reduced for certain environmental resource areas (i.e., for transportation, public and occupational health... NUCLEAR REGULATORY COMMISSION [NRC-2009-0435] Notice of Availability of Draft Environmental... of Availability of Draft Environmental Assessment and Draft Finding of No Significant Impact; Notice...

  10. Environmental Survey preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Sandia National Laboratories conducted August 17 through September 4, 1987. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Sandia National Laboratories-Albuquerque (SNLA). The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at SNLA, and interviews with site personnel. 85 refs., 49 figs., 48 tabs.

  11. 23 CFR 771.123 - Draft environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A... significant impacts on the environment. When the applicant, after consultation with any project sponsor that...

  12. Beverley project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-07-01

    The Beverley deposit is located on the northern Lake Frome Plains, South Australia, 520km north of Adelaide. It is proposed to mine the deposit by in-situ leaching and to process the solution on the surface to produce an estimated 11,600t of yellowcake from about 6 million tonnes of 0.27% ore over approximately 23 years. The draft environmental impact statement is intended to cover all stages of the development from the pilot plant to final rehabilitation. Sections include the existing environment (geology, climate and meteorology, soils, hydrology, ecology, radionuclide base levels, land use, population and sites of Aboriginal and archaeological significance), the proposed development (solution mining, waste management, water management and mining and processing options), rehabilitation, environmental impact and environmental management and monitoring

  13. 76 FR 57760 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-09-16

    ... approximately 707,000 subsurface acres of Federal mineral estate. Decisions in the Colorado River Valley RMP... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River Valley Field Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability...

  14. 78 FR 17653 - Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS-0408)

    Science.gov (United States)

    2013-03-22

    ... Wildlife Service Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS... Plains Wind Energy Draft Programmatic Environmental Impact Statement (Draft [[Page 17654

  15. 75 FR 78980 - Notice of Availability of the Draft Programmatic Environmental Impact Statement for Solar Energy...

    Science.gov (United States)

    2010-12-17

    ...] Notice of Availability of the Draft Programmatic Environmental Impact Statement for Solar Energy... Draft Programmatic Environmental Impact Statement (EIS) for Solar Energy Development in Six Southwestern... preferred method of commenting. Mail: Addressed to: Solar Energy Draft Programmatic EIS, Argonne National...

  16. Business plan: Supplemental draft environmental impact statement. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS

  17. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  18. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  19. 10 CFR 51.73 - Request for comments on draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Request for comments on draft environmental impact...-Regulations Implementing Section 102(2) Environmental Impact Statements § 51.73 Request for comments on draft environmental impact statement. Each draft environmental impact statement and each supplement to a draft...

  20. 10 CFR 51.81 - Distribution of draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...

  1. 10 CFR 51.86 - Distribution of draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...

  2. 76 FR 62434 - HUD Draft Environmental Justice Strategy

    Science.gov (United States)

    2011-10-07

    ... Justice Strategy AGENCY: Office of the Sustainable Housing and Communities, HUD. ACTION: Notice. SUMMARY: Through this notice, HUD announces the release of its draft Environmental Justice Strategy for review and... federal agency, with the law as its guide, should make environmental justice part of its mission. In this...

  3. Puget Sound area electric reliability plan: Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin

  4. 78 FR 20690 - Draft Environmental Impact Statement, Draft Habitat Conservation Plan, Draft Programmatic...

    Science.gov (United States)

    2013-04-05

    .... Background The Fowler Ridge application is unusual in that 355 wind turbines are already in place and have... Agreement, and Draft Implementing Agreement; Application for an Incidental Take Permit, Fowler Ridge Wind... application from Fowler Ridge Wind Farm LLC, Fowler Ridge II Wind Farm LLC, Fowler Ridge III Wind Farm LLC...

  5. 16 CFR 1.84 - Draft environmental impact statements: Availability and comment.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Draft environmental impact statements... Environmental Policy Act of 1969 § 1.84 Draft environmental impact statements: Availability and comment. Except for proposals for legislation, environmental impact statements shall be prepared in two stages: Draft...

  6. 10 CFR 51.70 - Draft environmental impact statement-general.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-general. 51.70... Implementing Section 102(2) Environmental Impact Statements § 51.70 Draft environmental impact statement—general. (a) The NRC staff will prepare a draft environmental impact statement as soon as practicable...

  7. 10 CFR 51.72 - Supplement to draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to draft environmental impact statement. 51.72... Implementing Section 102(2) Environmental Impact Statements § 51.72 Supplement to draft environmental impact statement. (a) The NRC staff will prepare a supplement to a draft environmental impact statement for which a...

  8. 10 CFR 51.85 - Draft environmental impact statement-rulemaking.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-rulemaking. 51.85... Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.85 Draft environmental impact... Commission has determined to prepare an environmental impact statement. ...

  9. 10 CFR 51.71 - Draft environmental impact statement-contents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-contents. 51.71... Implementing Section 102(2) Environmental Impact Statements § 51.71 Draft environmental impact statement—contents. (a) Scope. The draft environmental impact statement will be prepared in accordance with the scope...

  10. 10 CFR 51.117 - Draft environmental impact statement-notice of availability.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a draft environmental impact statement or any supplement to a draft environmental impact statement, the appropriate NRC staff director...

  11. 75 FR 53979 - Bison Brucellosis Remote Vaccination, Draft Environmental Impact Statement, Yellowstone National...

    Science.gov (United States)

    2010-09-02

    ... DEPARTMENT OF THE INTERIOR National Park Service Bison Brucellosis Remote Vaccination, Draft Environmental Impact Statement, Yellowstone National Park, Wyoming ACTION: Reopening of public comment period... Brucellosis Remote Vaccination Draft Environmental Impact Statement. The original comment period was from 28...

  12. Preliminary application of the draft code case for alloy 617 for a high temperature component

    International Nuclear Information System (INIS)

    Lee, Hyeong Yeon; Kim, Yong Wan; Song, Kee Nam

    2008-01-01

    The ASME draft Code Case for Alloy 617 was developed in the late 1980s for the design of very-high-temperature gas cooled reactors. The draft Code Case was patterned after the ASME Code Section III Subsection NH and was intended to cover Ni-Cr-Co-Mo Alloy 617 to 982 .deg. C (1800 .deg. F). But the draft Code Case is still in an incomplete status, lacking necessary material properties and design data. In this study, a preliminary evaluation on the creep-fatigue damage for a high temperature hot duct pipe structure has been carried out according to the draft Code Case. The evaluation procedures and results according to the draft Code Case for Alloy 617 material were compared with those of the ASME Subsection NH and RCC-MR for Alloy 800H material. It was shown that many data including material properties, fatigue and creep data should be supplemented for the draft Code Case. However, when the evaluation results on the creep-fatigue damage according to the draft Code Case, ASME-NH and RCC-MR were compared based on the preliminary evaluation, it was shown that the Alloy 617 results from the draft Code Case tended to be more resistant to the creep damage while less resistant to the fatigue damage than those from the ASME-NH and RCC-MR

  13. 78 FR 13082 - Draft Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement...

    Science.gov (United States)

    2013-02-26

    ...The Bureau of Reclamation has made available for public review and comment the draft Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement (EIR/EIS/EIS) for the Upper Truckee River Restoration and Marsh Restoration Project (Project). The California Tahoe Conservancy and the Tahoe Regional Planning Agency, the other lead agencies for the Project, made the EIR/EIS/EIS available to the public on February 8, 2013.

  14. 10 CFR 51.76 - Draft environmental impact statement-limited work authorization.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-limited work...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.76 Draft environmental impact statement—limited work authorization. The NRC will prepare a...

  15. 10 CFR 51.77 - Distribution of draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.77 Distribution of draft environmental impact statement. (a) In addition to the distribution...

  16. Transmission System Vegetation Management Program. Draft Environmental Impact Statement - Appendices

    International Nuclear Information System (INIS)

    1999-01-01

    The appendices covered in this Draft Environmental Impact Statement are: Appendix A--Public involvement; Appendix B--Biological weed control agents; Appendix C--BPA herbicide licensing plan; Appendix D--Sample educational information; Appendix E--Clearance criteria; Appendix F--USFS mitigation measures and background; Appendix G--BLM mitigation measures and background and Appendix H--Pesticide fact sheets

  17. Lucky Mc Uranium Mill. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-06-01

    The Environmental Impact Statement addressed the following: the existing environment; operations; environmental impacts; environmental effects of accidents; monitoring programs and other mitigating measures; unavoidable adverse environmental impacts; relationship between short-term uses of the environment and long-term productivity; irreversible and irretrievable commitments of resources; alternatives; and NRC benefit-cost summary for the Lucky Mc Mill

  18. Olympic Dam project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-10-01

    The Olympic Dam deposit, South Australia, is estimated to contain at least 2,000 million tonnes of mineralized material, with an average grade of about 1.6% copper, 0.6 Kg/t of uranium oxide and 0.6 g/t of gold. The objective of the project is to extract and process the ore for the production and sale of copper, uranium oxide and the associated gold and silver. Facilities required are an underground mine, an on-site processing plant, associated facilities including a tailings retention system, a town to accommodate up to 9,000 people and other infrastructure. Chapters in the draft E.I.S. contain information on the environment, land use, aboriginal environment, geology, tailings retention system, radiation assessment, project infrastructure, social effects and economic effects

  19. Resource Contingency Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  20. 75 FR 27579 - Bison Brucellosis Remote Vaccination, Draft Environmental Impact Statement, Yellowstone National...

    Science.gov (United States)

    2010-05-17

    ... DEPARTMENT OF THE INTERIOR National Park Service Bison Brucellosis Remote Vaccination, Draft... Brucellosis Remote Vaccination Program, Yellowstone National Park. SUMMARY: Pursuant to the National... the Bison Brucellosis Remote Vaccination Draft Environmental Impact Statement (EIS) for Yellowstone...

  1. Jabiluka project - Draft Environmental Impact Statement. Appendices

    International Nuclear Information System (INIS)

    1996-01-01

    The Appendices provide various technical data in support of studies presented in the Main Report, including the guidelines for an EIS at Jabiluka, environmental requirements, waste management plan, water management system criteria, water quality data, transport licensing and security procedures, rehabilitation plus specialist studies into ore characteristics, noise issues and haulage risk assessment. Copyright (1996) Energy Resources of Australia Limited

  2. 49 CFR 520.23 - Preparation of draft environmental impact statements.

    Science.gov (United States)

    2010-10-01

    ... social, economic, and environmental consequences. (b) Form and content requirements. Attachment 1 of this... environmental issues involved and take responsibility for the scope and content of draft and final environmental... 49 Transportation 6 2010-10-01 2010-10-01 false Preparation of draft environmental impact...

  3. 76 FR 22721 - Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact...

    Science.gov (United States)

    2011-04-22

    ...] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices... Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office...

  4. Bear Creek Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    The Bear Creek Project consists of mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from six known ore bodies will take place over ten years; a 1000 tons ore/day will be constructed and operated as long as ore is available. The tailings will be stored onsite in an impoundment. The project would convert 2700 acres from grazing use to mining/milling activities for about ten years. Mining would disturb a total of 1600 acres but, because of reclamation, the max acreage disturbed at any one time would be about 1000 acres, the average being about 650 acres. Dose rates were computed for an individual in a ranch house at the nearest ranch. Conditions for the protection of the environment are proposed. Possible environmental impacts evaluated cover air, land, water, soil, vegetation, wildlife, and community. A benefit-cost analysis is made

  5. Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1999-01-01

    On May 22, 1997, DOE published a Notice of Intent in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS)''. ''The Surplus Plutonium Disposition Draft Environmental Impact Statement'' (SPD Draft EIS) (DOWEIS-0283-D) was prepared in accordance with NEPA and issued in July 1998. It identified the potential environmental impacts of reasonable alternatives for the proposed siting, construction, and operation of three facilities for plutonium disposition. These three facilities would accomplish pit disassembly and conversion, immobilization, and MOX fuel fabrication. For the alternatives that included MOX fuel fabrication, the draft also described the potential environmental impacts of using from three to eight commercial nuclear reactors to irradiate MOX fuel. The potential impacts were based on a generic reactor analysis that used actual reactor data and a range of potential site conditions. In May 1998, DCE initiated a procurement process to obtain MOX fuel fabrication and reactor irradiation services. The request for proposals defined limited activities that may be performed prior to issuance of the SPD EIS Record of Decision (ROD) including non-site-specific work associated with the development of the initial design for the MOX fuel fabrication facility, and plans (paper studies) for outreach, long lead-time procurements, regulatory management, facility quality assurance, safeguards, security, fuel qualification, and deactivation. No construction on the proposed MOX facility would begin before an SPD EIS ROD is issued. In March 1999, DOE awarded a contract to Duke Engineering and Services; COGEMA, Inc.; and Stone and Webster (known as DCS) to provide the requested services. The procurement process

  6. Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-05-14

    On May 22, 1997, DOE published a Notice of Intent in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS)''. ''The Surplus Plutonium Disposition Draft Environmental Impact Statement'' (SPD Draft EIS) (DOWEIS-0283-D) was prepared in accordance with NEPA and issued in July 1998. It identified the potential environmental impacts of reasonable alternatives for the proposed siting, construction, and operation of three facilities for plutonium disposition. These three facilities would accomplish pit disassembly and conversion, immobilization, and MOX fuel fabrication. For the alternatives that included MOX fuel fabrication, the draft also described the potential environmental impacts of using from three to eight commercial nuclear reactors to irradiate MOX fuel. The potential impacts were based on a generic reactor analysis that used actual reactor data and a range of potential site conditions. In May 1998, DCE initiated a procurement process to obtain MOX fuel fabrication and reactor irradiation services. The request for proposals defined limited activities that may be performed prior to issuance of the SPD EIS Record of Decision (ROD) including non-site-specific work associated with the development of the initial design for the MOX fuel fabrication facility, and plans (paper studies) for outreach, long lead-time procurements, regulatory management, facility quality assurance, safeguards, security, fuel qualification, and deactivation. No construction on the proposed MOX facility would begin before an SPD EIS ROD is issued. In March 1999, DOE awarded a contract to Duke Engineering & Services; COGEMA, Inc.; and Stone & Webster (known as DCS) to provide the requested

  7. Wildlife mitigation program. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information

  8. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  9. Review of site recommendation process in Draft Environmental Assessments

    International Nuclear Information System (INIS)

    Joy, H.; Longo, T.; Burton, E.S.

    1985-01-01

    In December 1984, the US Department of Energy (DOE) published Draft Environmental Assessments (EAs) on nine potentially acceptable nuclear waste repository sites. Five sites in the states of Mississippi, Nevada, Texas, Utah, and Washington were proposed in the Draft EAs for nomination under the Nuclear Waste Policy Act as suitable for further detailed study (site characterization). The Nevada, Texas, and Washington sites were further proposed for recommendation to the President as preferred for site characterization. This paper reviews the process that DOE used in selecting the three sites proposed for site characterization. The process is consistent with DOE's implementation guidelines for selecting repository sites, and proceeds in three steps. First, the sites are ranked in order of preference for each of twenty technical guidelines based on information in the Draft EAs. The second step combines the individual guideline rankings into postclosure and preclosure guideline group rankings, and, finally, into an overall ranking. In the third step, the sensitivity of the choice of the three preferred sites is examined for a range of guideline weightings

  10. 76 FR 55703 - Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings...

    Science.gov (United States)

    2011-09-08

    ..., and physical and cyber security systems. The new JOC also must meet State essential service criteria... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings for the Joint Operations Center Relocation Project...

  11. 78 FR 44137 - Availability of Draft Environmental Impact Statement for the Proposed Construction of a Highway...

    Science.gov (United States)

    2013-07-23

    ... Environmental Impact Statement for the Proposed Construction of a Highway Bridge Across the Manatee River at... for the Manatee River Draft Environmental Impact Statement published in the Federal Register on July 5... published a notice titled, ``Availability of Draft Environmental Impact Statement for the Proposed...

  12. 76 FR 13396 - Notice of Availability of the Draft Environmental Impact Statement for the Mountaineer Commercial...

    Science.gov (United States)

    2011-03-11

    ... DEPARTMENT OF ENERGY Notice of Availability of the Draft Environmental Impact Statement for the... potential environmental impacts of a project proposed by American Electric Power (AEP) Service Corporation...) announces the availability of the Draft Environmental Impact Statement for the Mountaineer Commercial Scale...

  13. 2004 Power marketing program draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-04-01

    This is volume 3 of a draft environmental impact statement from the Western Power Administration's Sierra Nevada Region. Information is included on the following topics: statutory and legal framework; Sierra Nevada region customer groups and economic regions; renewable technology cost information matrix; hydrological assumptions; recreation resources along river reaches and the delta; archaeological and historical aspects; power resources in PROSYM; air quality regulatory structure; energy generation for PROSYM cases; overall power costs for utility, agriculture, and other customers; socioeconomic impacts in specific economic regions; projected air resource impacts; and land use, water quality, and solid waste impact factors

  14. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    International Nuclear Information System (INIS)

    1988-01-01

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs

  15. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2010-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service Coral Reef Restoration Plan, Draft Programmatic... Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National Environmental... availability of a Draft Programmatic Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan...

  16. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2012-06-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0070-422] Winter Use Plan, Supplemental.... ACTION: Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Winter... Supplemental Environmental Impact Statement (Draft SEIS) for a Winter Use Plan for Yellowstone National Park...

  17. 75 FR 1806 - Draft General Management Plan and Environmental Impact Statement, New River Gorge National River, WV

    Science.gov (United States)

    2010-01-13

    ... visitor experiences. Management actions would build upon the cultural resource, interpretive, and... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... Interior. ACTION: Notice of availability of the Draft General Management Plan and Environmental Impact...

  18. 76 FR 4719 - Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife...

    Science.gov (United States)

    2011-01-26

    ... guides and transporters to maintain big game hunting opportunities while reducing social conflict in the...] Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife Refuge... period for the Revised Comprehensive Conservation Plan and Environmental Assessment for Selawik National...

  19. 77 FR 56909 - Notice of Comment Period Extension for the Revised Draft Environmental Impact Report/Supplemental...

    Science.gov (United States)

    2012-09-14

    ... for the Revised Draft Environmental Impact Report/Supplemental Draft Environmental Impact Statement... Supplemental Draft Environmental Impact Statement (EIS) for the Fresno to Bakersfield Section of the California... this decision to be responsive to stakeholder requests and to encourage comprehensive public...

  20. 78 FR 19733 - Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National...

    Science.gov (United States)

    2013-04-02

    ... announce the dates, times, and locations of public meetings on the draft EIS/GMP through the NPS Planning... delivery to the above address. Electronic copies of the Draft EIS/GMP will be available online at http... through additional interpretive efforts, marketing, and facilities. Alternative C, the NPS preferred...

  1. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Science.gov (United States)

    2012-12-14

    ... eliminated. A maximum of 7,500 summer and winter landings would be permitted in the project area annually... considered, the BLM must receive written comments on the Draft RMP Amendment/Draft EIS within 90 days... meetings or hearings and any other public involvement activities at least 15 days in advance through public...

  2. 77 FR 68813 - Notice of Availability of the Draft Environmental Impact Statement and Environmental Impact...

    Science.gov (United States)

    2012-11-16

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA); the Federal Land Policy and Management Act of 1976, as amended; and the California Environmental Quality Act of 1970 (CEQA); the Bureau of Land Management (BLM) Bishop Field Office, Bishop, California; the United States Forest Service (USFS) Inyo National Forest; and the Great Basin Unified Air Pollution Control District (GBUAPCD) (a California state agency) have prepared a Draft Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) for the proposed Casa Diablo IV Geothermal Development Project near the Town of Mammoth Lakes in Mono County, California. This notice announces the opening of the public comment period.

  3. Replacement Nuclear Research Reactor. Supplement to Draft Environmental Impact Statement. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-01-01

    The Draft Environmental Impact Statement for a replacement research reactor at Lucas Heights, was available for public examination and comment for some three months during 1998. A Supplement to the Draft Environmental Impact Statement (Draft EIS) has been completed and was lodged with Environment Australia on 18 January 1999. The Supplement is an important step in the overall environmental assessment process. It reviews submissions received and provides the proponent`s response to issues raised in the public review period. General issues extracted from submissions and addressed in the Supplement include concern over liability issues, Chernobyl type accidents, the ozone layer and health issues. Further studies, relating to issues raised in the public submission process, were undertaken for the Supplementary EIS. These studies confirm, in ANSTO`s view, the findings of the Draft EIS and hence the findings of the Final EIS are unchanged from the Draft EIS

  4. Replacement Nuclear Research Reactor. Supplement to Draft Environmental Impact Statement. Volume 3

    International Nuclear Information System (INIS)

    1999-01-01

    The Draft Environmental Impact Statement for a replacement research reactor at Lucas Heights, was available for public examination and comment for some three months during 1998. A Supplement to the Draft Environmental Impact Statement (Draft EIS) has been completed and was lodged with Environment Australia on 18 January 1999. The Supplement is an important step in the overall environmental assessment process. It reviews submissions received and provides the proponent's response to issues raised in the public review period. General issues extracted from submissions and addressed in the Supplement include concern over liability issues, Chernobyl type accidents, the ozone layer and health issues. Further studies, relating to issues raised in the public submission process, were undertaken for the Supplementary EIS. These studies confirm, in ANSTO's view, the findings of the Draft EIS and hence the findings of the Final EIS are unchanged from the Draft EIS

  5. 77 FR 53908 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2012-09-04

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-IMRO-YELL-11188; 2310-0070-422] Winter Use... comment period on the Draft Supplemental Environmental Impact Statement (Draft SEIS) for a Winter Use Plan... online at http://parkplanning.nps.gov/YELL (click on the link to the 2012 Supplemental Winter Use Plan...

  6. Draft environmental assessment: Vacherie Dome site, Louisiana. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy (DOE) identified the Vacherie dome in Louisiana as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Vacherie dome site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations contained in this draft EA, the DOE has found that the Vacherie dome site is not disqualified under the guidelines. The site is contained in the Gulf Interior Region of the Gulf Coastal Plain, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains two other potentially acceptable sites - the Cypress Creek dome site and the Richton dome site. Although the Vacherie dome site appears to be suitable for site characterization, the DOE has concluded that the Richton dome site is the preferred site in the Gulf Interior Region. On the basis of these findings, the DOE is proposing to nominate the Richton dome site rather than the Vacherie dome site as one of the five sites suitable for characterization

  7. Draft environmental assessment: Swisher County site, Texas. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy (DOE) identified a location in Swisher County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. The potentially acceptable site was subsequently narrowed to an area of 9 square miles. To determine their suitability, the Swisher site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations contained in this draft EA, the DOE has found that the Swisher site is not disqualified under the guidelines. The site is contained in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site - the Deaf Smith site. Although the Swisher site appears to be suitable for site characterization, the DOE has concluded that the Deaf Smith site is the preferred site in the Permian Basin and is proposing to nominate the Deaf Smith site rather than the Swisher site as one of the five sites suitable for characterization

  8. Draft environmental assessment: Cypress Creek Dome site, Mississippi. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy (DOE) identified the Cypress Creek dome site in Mississippi as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Cypress Creek dome site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations contained in this draft EA, the DOE has found that the Cypress Creek dome site is not disqualified under the guidelines. The site is contained in the Gulf Interior Region of the Gulf Coastal Plain, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains two other potentially acceptable sites - the Richton dome site and the Vacherie dome site. Although the Cypress Creek dome site appears to be suitable for site characterization, the DOE has concluded that the Richton dome site is the preferred site in the Gulf Interior Region and is proposing to nominate the Richton dome site rather than the Cypress Creek dome site as one of the three sites suitable for characterization

  9. Draft environmental assessment: Lavender Canyon site, Utah. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy (DOE) identified the Lavender Canyon site in Utah, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Lavender Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations contained in this draft EA, the DOE has found that the Lavender Canyon site is not disqualified under the guidelines. The site is contained in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site - the Davis Canyon site. Although the Lavender Canyon site appears to be suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of these findings, the DOE is proposing to nominate the Davis Canyon site rather than the Lavender Canyon site as one of the five sites suitable for characterization

  10. Draft environmental assessment: reference repository location, Hanford Site, Washington. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy (DOE) identified a reference repository location at the Hanford Site in Washington as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the reference repository location at the Hanford Site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received on the draft EA. The reference repository location at Hanford is located in the Columbia Plateau, one of five distinct geohydrologic settings that are being considered for the first repository. On the basis of the evaluations reported in this draft EA, the DOE has found that the reference repository location at Hanford is not disqualified under the guidelines. The DOE has also found that it is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is proposing to nominate the reference repository location at Hanford as one of five sites suitable for characterization. Furthermore, having performed a comparative evaluation of the five sites proposed for nomination, the DOE has determined that the reference repository location at Hanford is one of three sites preferred for site characterization

  11. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  12. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  13. Nez Perce Tribal Hatchery Program: Draft environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1996-06-01

    This summary gives the major points of the Draft Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other interested parties. The Nez Perce once were one of the largest Plateau tribes in the Northwest and occupied a territory that included north central Idaho, southeastern Washington and northeastern Oregon. Salmon and other migratory fish species are an invaluable food resource and an integral part of the Nez Perce Tribe's culture. Anadromous fish have always made up the bulk of the Nez Perce tribal diet and this dependence on salmon was recognized in the treaties made with the Tribe by the US. The historic economic, social, and religious significance of the fish to the Nez Perce Tribe continues to this day, which makes the decline of fish populations in the Columbia River Basin a substantial detrimental impact to the Nez Perce way of life. The Nez Perce Tribal Hatchery is a supplementation program that would rear and release spring, summer, and fall chinook (Oncorhynchus tshawytscha), biologically similar to wild fish, to reproduce in the Clearwater River Subbasin. Program managers propose techniques that are compatible with existing aquatic and riparian ecosystems and would integrate hatchery-produced salmon into the stream and river environments needed to complete their life cycle

  14. Yakima fisheries project. Revised draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (adaptive management); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery. Only minor differences in environmental consequences were found between Alternatives 1 and 2. Potentially high impacts on wild, native, and non-target fish populations under both alternatives would be mitigated through careful adherence to the adaptive management process outlined in the EIS

  15. Nez Perce Tribal Hatchery Program : Draft Environmental Impact Statement Summary.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Nez Perce Tribal Hatchery (Idaho)

    1996-06-01

    This summary gives the major points of the Draft Environmental Impact Statement (EIS) prepared for the Nez Perce Tribal Hatchery by the Nez Perce Tribe (NPT), the Bonneville Power Administration (BPA), the Bureau of Indian Affairs (BIA), and other interested parties. The Nez Perce once were one of the largest Plateau tribes in the Northwest and occupied a territory that included north central Idaho, southeastern Washington and northeastern Oregon. Salmon and other migratory fish species are an invaluable food resource and an integral part of the Nez Perce Tribe`s culture. Anadromous fish have always made up the bulk of the Nez Perce tribal diet and this dependence on salmon was recognized in the treaties made with the Tribe by the US. The historic economic, social, and religious significance of the fish to the Nez Perce Tribe continues to this day, which makes the decline of fish populations in the Columbia River Basin a substantial detrimental impact to the Nez Perce way of life. The Nez Perce Tribal Hatchery is a supplementation program that would rear and release spring, summer, and fall chinook (Oncorhynchus tshawytscha), biologically similar to wild fish, to reproduce in the Clearwater River Subbasin. Program managers propose techniques that are compatible with existing aquatic and riparian ecosystems and would integrate hatchery-produced salmon into the stream and river environments needed to complete their life cycle.

  16. 76 FR 58833 - Notice of Availability of the Draft Environmental Impact Statement/Environmental Impact Report...

    Science.gov (United States)

    2011-09-22

    ...The Department of the Interior and the California Department of Fish and Game have prepared a draft environmental impact statement and environmental impact report (EIS/EIR) evaluating the effects of removing four dams on the Klamath River in southern Oregon and northern California. These documents are one part of the total record that will inform the decision of the Secretary of the Interior on whether removing the dams will advance restoration of the fisheries of the Klamath River Basin and will be in the public interest.

  17. 2004 Power marketing program, draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-04-01

    The Sierra Nevada Region proposes to develop a marketing plan that would be implemented in the year 2005 and to allocate power to eligible entities within its marketing area in northern and central California and Nevada. Four alternatives were analyzed that are structured around the range of operations of the Central Valley Project hydroelectric system, levels of power purchases, and customer group allocations. The manner in which hydropower Generating plants are operated is one of the fundamental differences across the alternatives. Operating the hydrosystem to provide peaking power (the maximize hydropower peaking alternative, which is similar to the no-action alternative), would provide up to 941 MW of additional load-carrying capacity in comparison to baseload operations of the CVP system (the baseload alternative). Although it is not possible to determine where or when any lost capacity would be made up, building replacement capacity in response to the baseload alternative would result in land-use impacts and the use of natural and financial resources. Peaking also results in small but beneficial regional economic effects. Peaking and baseload alternatives result in different hourly air emission patterns. The peaking alternative results in annual reductions in air pollution and wastewater. Impacts within the CVP are limited to regulating reservoirs, which would have reduced pool-level fluctuations under the baseload alternative. Changes in allocations to customer groups result in small regional effects that are dependent on assumptions made about customer access to wholesale energy markets. The renewable resource acquisition alternative assumes that technology improvements allow for competitively melding 250 MW of renewables with Federal hydropower. Environmental impacts of the renewables alternative depend on the presence of biomass in the resource mix. Overall, the 2004 Draft Environmental Impact Statement (2004 EIS) identified no significant impacts

  18. Public comments on the draft generic environmental impact statement for management of commercially generated radioactive waste

    International Nuclear Information System (INIS)

    Kreiter, M.R.; Unruh, C.M.; McCallum, R.F.

    1980-01-01

    The US Department of Energy has the responsibility for developing the technology required for managing commercial radioactive wastes in an environmentally acceptable manner. As part of this responsibility, DOE has prepared a draft environmental impact statement on the management of commercially generated radioactive waste. The draft was issued for public comment in April of 1979; five public hearings were held. The draft GEIS is intended to provide environmental input for the selection of an appropriate program strategy for the permanent isolation of commercially generated high-level and transuranic wastes. The scope of such a strategy includes research and development into alternative treatment processes and emplacement media, site investigations into candidate media, and the examination of advanced waste management technologies. The draft statement describes the commercial radioactive wastes that would have to be managed for very long periods of time from an assumed nuclear generation scenario of 10,000 GWe-yr of power over a 65-year period ending in 2040

  19. 75 FR 36091 - Notice of Availability of the Draft Environmental Impact Statement for Improvements to the...

    Science.gov (United States)

    2010-06-24

    ... Environmental Quality Advisor, Portfolio Management Division, Capital Investment Branch (9P2PTC), U.S. General...://www.gsa.gov/nepalibrary . Other matters regarding this environmental review should be referred to Greg... GENERAL SERVICES ADMINISTRATION Notice of Availability of the Draft Environmental Impact Statement...

  20. 76 FR 55941 - Notice of Availability of the Draft Bakersfield Resource Management Plan and Draft Environmental...

    Science.gov (United States)

    2011-09-09

    ... a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS... development and other land use authorizations with resource values; and (6) climate change. The Draft RMP... authorizations, livestock grazing, mineral development and recreation. Bitter Creek (6,121 acres): This newly...

  1. Lummi Bay Marina, Whatcom County, Washington. Draft Detailed Project Report and Draft Environmental Impact Statement.

    Science.gov (United States)

    1983-12-01

    the eastern north Pacific Ocean at s *me season of the year, which are listed as endangered "jnder the Lndangercd Spc ;ici; hcL of 1973, and which...efficient vessel operation. The selection of channel depth was dependent upon the loaded draft of expected vessels, squat or sinkage. trim maneuverability

  2. 76 FR 57759 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-09-16

    ... federally-owned subsurface mineral estate. The Colorado River Valley Field Office and the KFO were... Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In... Avenue, Kremmling, Colorado 80459. Copies of the Kremmling Draft RMP/EIS are available in the KFO at the...

  3. Draft environmental statement related to the operation of River Bend Station (Docket No. 50-458)

    International Nuclear Information System (INIS)

    1984-07-01

    This draft environmental statement contains the second assessment of the environmental impact associated with the operation of River Bend Station, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  4. Draft environmental assessment: Davis Canyon site, Utah. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations reported in this draft EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. The site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site - the Lavender Canyon site. Although the Lavender Canyon site appears to be suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. Furthermore, the DOE finds that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is proposing to nominate the Davis Canyon site as one of five sites suitable for characterization. Having compared the Davis Canyon site with the other four sites proposed for nomination, the DOE has determined that the Davis Canyon site is not one of the three preferred sites for recommendation to the President as candidates for characterization

  5. Draft environmental assessment: Deaf Smith County site, Texas. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. The potentially acceptable site was subsequently narrowed to an area of 9 square miles. To determine their suitability, the Deaf Smith site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment, which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations reported in this draft EA, the DOE has found that the Deaf Smith site is not disqualified under the guidelines. The site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site - the Swisher site. Although the Swisher site appears to be suitable for site characterization, DOE has concluded that the Deaf Smith site is the preferred site. The DOE finds that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is proposing to nominate the Deaf Smith site as one of five sites suitable for characterization. Having compared the Deaf Smith site with the other four sites proposed for nomination, the DOE has determined that the Deaf Smith site is one of the three preferred sites for recommendation to the President as candidates for characterization

  6. 77 FR 59180 - Withdrawal of Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2012-09-26

    ...The Los Angeles District of the U.S. Army Corps of Engineers (Corps) published a Notice of Intent to Prepare a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Ballona Creek Ecosystem Restoration Feasibility Study in the Federal Register on September 20, 2005 (70 FR 55116). The study's purpose is to evaluate structural and non-structural means of restoring diminished ecosystem functions and services within the lower reach of Ballona Creek including coastal wetlands. Santa Monica Bay Restoration Commission (SMBRC) is the local sponsor for the cost-shared study. On September 29, 2005, a public scoping meeting was held pursuant to requirements of the National Environmental Policy Act and Engineer Regulations 1105-2-100. Baseline conditions portions of the EIS/EIR have been completed as of January, 2012. On July 17, 2012, the SMBRC requested the Corps terminate the study. Therefore, the Corps is withdrawing the Notice of Intent to Prepare a draft EIS/EIR.

  7. 75 FR 1048 - Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact...

    Science.gov (United States)

    2010-01-08

    ... Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland..., Office of Environmental Compliance, Office of Environmental Management. [FR Doc. 2010-224 Filed 1-7-10; 8... DEPARTMENT OF ENERGY Notice of Public Hearings on the Draft Tank Closure and Waste Management...

  8. 75 FR 58369 - Intent To Prepare a Draft Environmental Impact Statement for the North Branch Ecorse Creek, Flood...

    Science.gov (United States)

    2010-09-24

    ... Draft EIS will address potential environmental impacts of the construction, operation, and maintenance... Environmental Impact Statement for the North Branch Ecorse Creek, Flood Risk Management General Reevaluation... Notice of Intent (NOI) to prepare a Draft Environmental Impact Statement (EIS) for flood risk management...

  9. 75 FR 9878 - Draft Principles and Standards Sections of the “Economic and Environmental Principles and...

    Science.gov (United States)

    2010-03-04

    ... COUNCIL ON ENVIRONMENTAL QUALITY Draft Principles and Standards Sections of the ``Economic and... the ``Economic and Environmental Principles and Guidelines for Water and Related Land Resources... may be accessed at the Internet addresses indicated: ``Economic and Environmental Principles and...

  10. 76 FR 44604 - Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact...

    Science.gov (United States)

    2011-07-26

    ... Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact Statement AGENCY... availability of the Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact... resident Canada geese. Action is needed at this time to manage the restored wetlands at the Park. The Plan...

  11. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  12. 78 FR 44969 - Notice of Availability of a Draft Environmental Assessment for Allowing Avian Hunting in...

    Science.gov (United States)

    2013-07-25

    ... environmental impact statement will not be prepared unless additional information which may affect this decision... INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO Notice of Availability of a Draft Environmental Assessment for Allowing Avian Hunting in Designated Areas Along the Rio Grande...

  13. 78 FR 20942 - Niobrara Confluence and Ponca Bluffs Conservation Areas, NE and SD; Draft Environmental Impact...

    Science.gov (United States)

    2013-04-08

    ... Environmental Impact Statement and Land Protection Plan; Request for Public Comments AGENCY: Fish and Wildlife... a draft environmental impact statement (DEIS) and land protection plan (LPP) for the proposed... resources to enhance conservation; enhance recreation; increase tourism; instill new money into local...

  14. 76 FR 80385 - Draft Environmental Impact Statement and Proposed Maricopa Sun Solar Complex Multi-Species...

    Science.gov (United States)

    2011-12-23

    .... Operation related activities could include solar panel maintenance, on-site parking, operation of solar...-FXES11120800000F2-123] Draft Environmental Impact Statement and Proposed Maricopa Sun Solar Complex Multi-Species... National Environmental Policy Act for the proposed Maricopa Sun Solar Complex Habitat Conservation Plan...

  15. 76 FR 35208 - Boott Hydropower, Inc.; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 2790-055] Boott Hydropower, Inc.; Notice of Availability of Draft Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC) regulations...

  16. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  17. 77 FR 38823 - Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement...

    Science.gov (United States)

    2012-06-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.FX0000, LVRWB11B4520] Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement/Environmental Impact Report and Proposed California Desert Conservation Area Plan Amendment, Kern County, CA...

  18. 75 FR 62433 - Notice of Public Hearings and the Availability of a Draft Programmatic Environmental Impact...

    Science.gov (United States)

    2010-10-08

    ... impacts of marine seismic research on the human and natural environment. Under the Proposed Action, a... Environmental Impact Statement/Overseas Environmental Impact Statement (PEIS/OEIS) AGENCY: National Science... Ocean Sciences in the Directorate for Geosciences (GEO/OCE) has prepared the Draft PEIS as the lead...

  19. Evaluation of a draft standard on performance specifications for health physics instrumentation: results for environmental tests

    International Nuclear Information System (INIS)

    Kenoyer, J.L.; Swinth, K.L.; Mashburn, K.R.; Selby, J.M.

    1984-06-01

    Draft ANSI Standard N42.17 on performance specifications for health physics instrumentation is currently being evaluated by the Pacific Northwest Laboratory. Evaluation is performed by testing a cross-section of currently available instruments with testing procedures based on specifications of the standard and then determining the degree of conformance to the various elements of the proposed standard. Data will be presented on the performance of a cross-section of beta-gamma survey instruments under various environmental tests. Test results that will be presented include temperature effects, humidity effects, radio frequency (r.f.) susceptibility, ambient pressure effects, vibration effects, and shock effects. Tests performed to date show that most instruments will meet the temperature, humidity, and ambient pressure tests. A large variability is noted among instruments from the same or different vendors. Preliminary r.f. susceptibility tests have shown large artificial responses at some frequencies for specific instruments. The presentation will also include a discussion of procedures used in the testing and weaknesses identified in the proposed standard

  20. Pilot test of ANSI draft standard N13.29 environmental dosimetry -- Performance criteria for testing

    International Nuclear Information System (INIS)

    Klemic, G.; Shebell, P.; Monetti, M.; Raccah, F.; Sengupta, S.

    1998-09-01

    American National Standards Institute Draft N13.29 describes performance tests for environmental radiation dosimetry providers. If approved it would be the first step toward applying the types of performance testing now required in personnel dosimetry to environmental radiation monitoring. The objective of this study was to pilot test the draft standard, before it undergoes final balloting, on a small group of dosimetry providers that were selected to provide a mix of facility types, thermoluminescent dosimeter designs and monitoring program applications. The first phase of the pilot test involved exposing dosimeters to laboratory photon, beta, and x-ray sources at routine and accident dose levels. In the second phase, dosimeters were subjected to ninety days of simulated environmental conditions in an environmental chamber that cycled through extremes of temperature and humidity. Two out of seven participants passed all categories of the laboratory testing phase, and all seven passed the environmental test phase. While some relatively minor deficiencies were uncovered in the course of the pilot test, the results show that draft N13.29 describes useful tests that could be appropriate for environmental dosimetry providers. An appendix to this report contains recommendations that should be addressed by the N13.29 working group before draft N13.29 is submitted for balloting

  1. 76 FR 30962 - Notice of Availability of Draft Environmental Impact Statement for the Sigurd to Red Butte No. 2...

    Science.gov (United States)

    2011-05-27

    ...; UTU-83067] Notice of Availability of Draft Environmental Impact Statement for the Sigurd to Red Butte..., as amended, the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement... Service; State of Utah; Millard, Sevier, Beaver, Iron, and Washington counties, Utah; and the cities of St...

  2. 78 FR 48713 - Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in...

    Science.gov (United States)

    2013-08-09

    ...] Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in Lea County, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY... Draft Environmental Impact Statement (EIS) for the Ochoa Mine Project (Project) and by this notice is...

  3. 77 FR 26578 - Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meeting for...

    Science.gov (United States)

    2012-05-04

    ...The Bureau of Reclamation and the San Joaquin River Exchange Contractors Water Authority have made available for public review and comment the joint draft environmental impact statement/environmental impact report (Draft EIS/EIR) for the Water Transfer Program, 2014- 2038. The proposed new transfer program would provide for the transfer and/or exchange of up to 150,000 acre-feet of substitute water from the San Joaquin River Exchange Contractors Water Authority to several potential users over a 25-year timeframe (water service years 2014- 2038).

  4. 75 FR 17940 - Draft Programmatic Environmental Assessment for the Evaluation of the Grant Programs Directorate...

    Science.gov (United States)

    2010-04-08

    ... Environmental Assessment (PEA) to address the potential impacts to the human environment resulting from typical... projects. FEMA is also making available for public comment a draft Memorandum of Understanding (MOU..., minimize and avoid avian mortalities from communication tower construction activities funded by FEMA. The...

  5. 76 FR 38680 - Notice of Availability of the Draft Environmental Impact Statement for the West Chocolate...

    Science.gov (United States)

    2011-07-01

    ... Availability of the Draft Environmental Impact Statement for the West Chocolate Mountains Renewable Energy...) for the West Chocolate Mountains Renewable Energy Evaluation Area. By this notice, the BLM is...: You may submit comments related to the West Chocolate Mountains Renewable Energy Evaluation Area by...

  6. 75 FR 54177 - Notice of Availability of Draft Environmental Impact Statement for the Tonopah Solar Energy...

    Science.gov (United States)

    2010-09-03

    ... Statement for the Tonopah Solar Energy Crescent Dunes Solar Energy Project, Nye County, NV AGENCY: Bureau of... Environmental Impact Statement (EIS) for the Crescent Dunes Solar Energy Project, Nye County, Nevada, and by... considered, the BLM must receive written comments on the Crescent Dunes Solar Energy Project Draft EIS within...

  7. 78 FR 17383 - Notice of Availability of Environmental Assessment and Draft Finding of No Significant Impact...

    Science.gov (United States)

    2013-03-21

    ... (truck, rail, and marine). DLA Energy's implementation of a systemic change to the use of commercial..., Terrestrial, and Cultural Resources--Transport and storage of fuel products is highly regulated. DLA Energy's... of Environmental Assessment and Draft Finding of No Significant Impact Regarding DLA Energy's...

  8. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-05-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003 Montana] Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  9. 78 FR 4134 - Availability of the Draft Finding of No Significant Impact and Final Programmatic Environmental...

    Science.gov (United States)

    2013-01-18

    ... Afghanistan, while reducing spending without sacrificing critical national defense capabilities. The draft... military personnel to maximum increases of 3,000 at the Army's largest installations) was chosen for the... a total of 1,000 military personnel. The PEA analyzes the environmental impact of two Action...

  10. 75 FR 6377 - Onyx Specialty Papers, Inc.; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2010-02-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2985-006] Onyx Specialty Papers, Inc.; Notice of Availability of Draft Environmental Assessment February 2, 2010. In accordance... lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii...

  11. 78 FR 57538 - Proposed Waste Confidence Rule and Draft Generic Environmental Impact Statement

    Science.gov (United States)

    2013-09-19

    ..., Chief, Communication, Planning, and Rulemaking Branch Waste Confidence Directorate, Office of Nuclear...-2012-0246] RIN 3150-AJ20 Proposed Waste Confidence Rule and Draft Generic Environmental Impact... disposal (proposed Waste Confidence rule). In addition, the NRC will receive public comment on its...

  12. 78 FR 5494 - Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith National...

    Science.gov (United States)

    2013-01-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-IMR-LAMR-10224; 2310-0091-422] Off-Road... Service (NPS) is releasing a Draft Environmental Impact Statement (DEIS) for the Off- Road Vehicle... impacts of four alternatives that address off-road vehicle (ORV) management in the national recreation...

  13. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Science.gov (United States)

    2013-05-03

    .... Alternative 2, the NPS preferred alternative, would support a broad ecosystem approach for preserve management... management of cross-boundary resource issues and the importance of encouraging partnerships to address and... Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas AGENCY: National...

  14. 75 FR 29357 - Notice of Availability of the Draft Programmatic Environmental Assessment for the Deployment and...

    Science.gov (United States)

    2010-05-25

    ... technology that is used to aid in inspecting high-density cargo containers for contraband such as illicit... DEPARTMENT OF HOMELAND SECURITY U.S. Customs and Border Protection Notice of Availability of the Draft Programmatic Environmental Assessment for the Deployment and Operation of High Energy X-Ray...

  15. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Science.gov (United States)

    2011-04-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...

  16. 76 FR 57751 - Notice of Availability of a Draft Programmatic Environmental Impact Statement for Northern Border...

    Science.gov (United States)

    2011-09-16

    ... particular place. Because this effort is programmatic in nature, the Draft PEIS does not define effects for a... the purposes of the PEIS, the Northern Border is defined as the area between the United States and... environmental quality and the government's role in protecting it. The essence of NEPA is the requirement that...

  17. 78 FR 5492 - Draft Environmental Impact Statement for Merced Wild and Scenic River Comprehensive Management...

    Science.gov (United States)

    2013-01-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO-11522; PX.P0131800B.00.1] Draft Environmental Impact Statement for Merced Wild and Scenic River Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa Counties, CA AGENCY: National Park Service, Interior. ACTION: Notice of...

  18. 78 FR 16294 - Draft Environmental Impact Statement for Restoration of the Mariposa Grove of Giant Sequoias...

    Science.gov (United States)

    2013-03-14

    ... Environmental Impact Statement for Restoration of the Mariposa Grove of Giant Sequoias, Yosemite National Park, Madera, and Mariposa Counties, CA AGENCY: National Park Service, Interior. ACTION: Notice of availability... the Mariposa Grove of giant sequoias in Yosemite National Park. This Draft EIS presents three...

  19. 75 FR 1585 - Draft Environmental Impact Statement; Determination of Regulated Status of Alfalfa Genetically...

    Science.gov (United States)

    2010-01-12

    ...] Draft Environmental Impact Statement; Determination of Regulated Status of Alfalfa Genetically... and Forage Genetics International alfalfa lines designated as events J101 and J163 as regulated... International (FGI) alfalfa events J101 and J163 were no longer considered regulated articles under the...

  20. 75 FR 8299 - Draft Environmental Impact Statement; Determination of Regulated Status of Alfalfa Genetically...

    Science.gov (United States)

    2010-02-24

    ...] Draft Environmental Impact Statement; Determination of Regulated Status of Alfalfa Genetically... making a determination on the status of the Monsanto Company and Forage Genetics International alfalfa... status of the Monsanto Company and Forage Genetics International alfalfa lines designated as events J101...

  1. 75 FR 54377 - Cattle Point Road Relocation; Draft Environmental Impact Statement; San Juan Island National...

    Science.gov (United States)

    2010-09-07

    ... website and via local and regional media. During the review period, several options are available for... Resources, have prepared a draft environmental impact statement (DEIS) for alternatives designed to respond...; additionally, a press release was issued and a notice posted on the Park website announcing availability of the...

  2. 77 FR 73996 - Notice of Availability for the Draft Programmatic Environmental Assessment for the Recycling of...

    Science.gov (United States)

    2012-12-12

    ... for the purpose of recycling. The suspension was imposed in response to public concerns about the... for the Recycling of Scrap Metals Originating From Radiological Areas AGENCY: Department of Energy... public review and comment of the Draft Programmatic Environmental Assessment (PEA) for the Recycling of...

  3. 77 FR 75646 - Kenai National Wildlife Refuge, Soldotna, AK; Draft Environmental Impact Statement for the...

    Science.gov (United States)

    2012-12-21

    ... intermingled with hundreds of lakes. Boreal forests are home to moose, wolves, black and brown bears, lynx... FXRS12650700000] 123 Kenai National Wildlife Refuge, Soldotna, AK; Draft Environmental Impact Statement for the... . Send your comments or requests for information by any one of the following methods: Email: fw7_kenai...

  4. 76 FR 39890 - St. Johns National Wildlife Refuge, FL; Draft Comprehensive Conservation Plan and Environmental...

    Science.gov (United States)

    2011-07-07

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R4-R-2011-N053; 40136-1265-0000-S3] St... conservation plan and environmental assessment (Draft CCP/EA) for St. Johns National Wildlife Refuge (NWR) in... Complex, P.O. Box 2683, Titusville, FL 32781, or via e-mail at [email protected] , or St. Johns CCP...

  5. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Science.gov (United States)

    2013-02-26

    ... visitor use in the Park. The GMP will provide updated management direction for the entire park. The EEWS....YP0000] Draft Environmental Impact Statement for General Management Plan, Everglades National Park... the General Management Plan (GMP) and East Everglades Wilderness Study (EEWS) for Everglades National...

  6. 78 FR 756 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Vantage...

    Science.gov (United States)

    2013-01-04

    ... Vantage-Pomona Heights 230kV Transmission Line Project in Yakima, Grant, Benton, and Kittitas Counties, WA...) has prepared a Draft Environmental Impact Statement (EIS) for the Vantage- Pomona Heights 230kV... submit comments related to the Vantage-Pomona Heights 230kV Transmission Line Project by any of the...

  7. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  8. 77 FR 1501 - Special Purpose Permit Application; Draft Environmental Assessment; Hawaii-Based Shallow-Set...

    Science.gov (United States)

    2012-01-10

    ...-FF01M01000] Special Purpose Permit Application; Draft Environmental Assessment; Hawaii-Based Shallow-Set... the operation of the Hawaii-based shallow-set longline fishery that targets swordfish (Xiphias gladius... albatross, by NMFS in its regulation of the shallow-set longline fishery based in Hawaii. This fishery...

  9. Fuel Receiving and Storage Station. Nuclear Regulatory Commission's draft environmental statement

    International Nuclear Information System (INIS)

    1975-05-01

    A draft of the environmental impact statement for the Barnwell Fuel Receiving and Storage Station is presented. This facility is being constructed on a 1700 acre site about six miles west of the city of Barnwell in Barnwell County, South Carolina. The following topics are discussed: the site, the station, environmental effects of site preparation and station construction, environmental effects of station operation, effluent and environmental monitoring programs, environmental effects of accidents , need for the station, benefit-cost analysis of alternatives, and conclusions. (U.S.)

  10. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  11. Draft Environmental Statement related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1984-12-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with Beaver Valley Power Station Unit 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs

  12. Conforth Ranch (Wanaket) Wildlife Mitigation Project. Draft Management Plan and Draft Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI)

  13. 78 FR 26065 - Notice of Availability of the Draft Environmental Impact Statement for the Jump Creek, Succor...

    Science.gov (United States)

    2013-05-03

    ...] Notice of Availability of the Draft Environmental Impact Statement for the Jump Creek, Succor Creek, and... the Jump Creek, Succor Creek, and Cow Creek Watersheds Grazing Permit Renewal and by this notice is... receive written comments on the Draft EIS for the Jump Creek, Succor Creek, and Cow Creek Watersheds...

  14. 76 FR 80409 - Draft Supplement 2 to Final Environmental Statement Related to the Operation of Watts Bar Nuclear...

    Science.gov (United States)

    2011-12-23

    ... Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2; Tennessee Valley Authority..., Related to the Operation of Watts Bar Nuclear Plant [WBN], Unit 2--Draft Report for Comment'' (draft SFES.... Stephen J. Campbell, Chief, Watts Bar Special Projects Branch, Division of Operating Reactor Licensing...

  15. 78 FR 31974 - Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Meetings...

    Science.gov (United States)

    2013-05-28

    ...The Bureau of Reclamation has made available for public review and comment, the Draft Resource Management Plan (RMP)/Draft Environmental Impact Statement (DEIS) for the Newlands Project. This RMP/DEIS provides a range of alternatives for managing Reclamation- administered lands in the Newlands Project Planning Area, which is in the west-central Nevada counties of Washoe, Storey, Lyon, and Churchill.

  16. 75 FR 7515 - Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the...

    Science.gov (United States)

    2010-02-19

    ... Stirling Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment... Commission (CEC) have prepared a Draft Environmental Impact Statement (EIS), Draft California Desert... impacts of the proposed Solar Two Project on air quality, biological resources, cultural resources, water...

  17. 76 FR 70479 - Draft Environmental Assessment and Safe Harbor Agreement for the Houston Toad Within Nine Texas...

    Science.gov (United States)

    2011-11-14

    ...] Draft Environmental Assessment and Safe Harbor Agreement for the Houston Toad Within Nine Texas Counties... of the endangered Houston toad (Bufo houstonensis) as a result of conservation actions, land...: [email protected] . Include ``Clear Lake Ecological Services Field Office draft Houston Toad...

  18. 78 FR 15007 - Notice of Open House-Draft Environmental Impact Statement for Revised Water Control Manuals for...

    Science.gov (United States)

    2013-03-08

    ... DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Notice of Open House--Draft... AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD. ACTION: Notice of Open House meetings... conduct open house style meetings and accept comments on the Draft Environmental Impact Statement (DEIS...

  19. 77 FR 68816 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Sun Valley to...

    Science.gov (United States)

    2012-11-16

    ...; AZA35079] Notice of Availability of the Draft Environmental Impact Statement for the Proposed Sun Valley to... Proposed Sun Valley to Morgan 500/230-kilovolt (kV) Transmission Line Project (Project) and Draft Bradshaw... comments by any of the following methods: Web site: http://www.blm.gov/az/st/en.html . Email: SunValley...

  20. Draft environmental assessment: Yucca Mountain site, Nevada research and development area, Nevada. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy (DOE) identified the Yucca Mountain site in Nevada as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Yucca Mountain site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received on the draft EA. The Yucca Mountain site is located in the Great Basin, one of five distinct geohydrologic settings that are being considered for the first repository. On the basis of the evaluations reported in this draft EA, the DOE has found that the Yucca Mountain site is not disqualified under the guidelines. The DOE has also found that it is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is proposing to nominate the Yucca Mountain site as one of five sites suitable for characterization. Furthermore, having performed a comparative evaluation of the five sites proposed for nomination, the DOE has determined that the Yucca Mountain site is one of three sites preferred for site characterization

  1. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

    1981-02-01

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

  2. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

  3. Resource programs: Draft Environmental Impact Statement Resource Programs

    International Nuclear Information System (INIS)

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program's Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS

  4. 77 FR 63301 - Juneau Hydropower, Inc.; Notice of Draft License Application and Preliminary Draft Environmental...

    Science.gov (United States)

    2012-10-16

    .... 791(a)-825(r). h. Applicant Contact: Duff Mitchell, Business Manager, Juneau Hydropower, Inc., P.O... information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnline... access the document. For assistance, contact FERC Online Support. You may also register online at http...

  5. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  6. 78 FR 59712 - Notice of Availability of the Draft Environmental Impact Statement for the 3 Bars Ecosystem and...

    Science.gov (United States)

    2013-09-27

    ... Ecosystem and Landscape Restoration Project in Eureka County, NV AGENCY: Bureau of Land Management, Interior..., has prepared a Draft Environmental Impact Statement (EIS) for the 3 Bars Ecosystem and Landscape...

  7. Joint NEPA/SEPA draft environmental impact statement Washington Windplant No. 1

    International Nuclear Information System (INIS)

    1995-02-01

    This is the draft Environmental Impact Statement for a proposed construction and operation of a 115 megawatt Washington Windplant No. 1 by KENETECH Windpower, Inc in Klickitat County, Washington. The Project would be constructed on private land (5,110 hectares) under easement to KENETECH Windpower, Inc., and would include approximately 345 type 33M-VS wind turbines. Alternatives to the Proposed Action include an alternative powerline route; a restricted areas alternative; a subarea development alternative; a no-action alternative

  8. Revised draft: Northeastern Regional environmental characterization report. Volume 1

    International Nuclear Information System (INIS)

    1984-11-01

    This report presents available environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Maine, New Hampshire, Vermont, northeastern and southeastern New York, Massachusetts, Rhode Island, Connecticut, northern New Jersey, and eastern Pennsylvania. For each of the states within the Northeastern Region, information is provided on those environmental disqualifying factors and regional screening variables to be used in region-to-area screening. These environmental factors and variables include existing and proposed federal protected lands, proximity to federal protected lands, existing state protected lands, proximity to state protected lands, population density and distribution, proximity to highly populated areas, national and state forest lands, state wildlife lands, designated critical habitats for threatened and endangered species, surface water bodies, and wetlands. In addition, supplementary descriptive information providing a general characterization of the region is presented, as is information on environmental parameters that may be of use at later phases of screening. Also included is a discussion of the relationship between the US Department of Energy (DOE) Siting Guidelines and those environmental disqualifying factors and regional screening variables to be used in the region-to-area screening process

  9. Revised draft: Southeastern Regional environmental characterization report. Volume 1

    International Nuclear Information System (INIS)

    1984-11-01

    This report presents available environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in central Maryland; noncoastal Virginia, North Carolina, and South Carolina; and northern Georgia. For each of the states within the Southeastern Region, information is provided on those environmental disqualifying factors and regional screening variables to be used in region-to-area screening. These environmental factors and variables include existing and proposed federal protected lands, proximity to federal protected lands, existing state protected lands, proximity to state protected lands, population density and distribution, proximity to highly populated areas, national and state forest lands, state wild-life lands, designated critical habitats for threatened and endangered species, surface water bodies, and wetlands. In addition, supplementary descriptive information providing a general characterization of the region is presented, as is information on environmental parameters that may be of use at later phases of screening. Also included is a discussion of the relationship between the US Department of Energy (DOE) Siting Guidelines and those environmental disqualifying factors and regional screening variables to be used in the region-to-area screening process

  10. Revised draft: North Central Regional environmental characterization report. Volume 1

    International Nuclear Information System (INIS)

    1984-11-01

    This report presents available environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Minnesota, Wisconsin, and the Upper Peninsula of Michigan. For each of the states within the North Central Region, information is provided on those environmental disqualifying factors and regional screening variables to be used in region-to-area screening. These environmental factors and variables include existing and proposed federal protected lands, proximity to federal protected lands, existing state protected lands, proximity to state protected lands, population density and distribution, proximity to highly populated areas, national and state forest lands, state wildlife lands, designated critical habitats for threatened and endangered species, surface water bodies, and wetlands. In addition, supplementary descriptive information providing a general characterization of the region is presented, as is information on environmental parameters that may be of use at later phases of screening. Also included is a discussion of the relationship between the DOE Siting Guidelines and those environmental disqualifying factors and regional screening variables to be used in the region-to-area screening process

  11. Draft environmental assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-06-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  12. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  13. Advanced mixed waste treatment project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-07-01

    The AMWTP DEIS assesses the potential environmental impacts associated with four alternatives related to the construction and operation of a proposed waste treatment facility at the INEEL. Four alternatives were analyzed: The No Action Alternative, the Proposed Action, the Non-Thermal Treatment Alternative, and the Treatment and Storage Alternative. The proposed AMWTP facility would treat low-level mixed waste, alpha-contaminated low-level mixed waste, and transuranic waste in preparation for disposal. Transuranic waste would be disposed of at the Waste isolation Pilot Plant in New Mexico. Low-level mixed waste would be disposed of at an approval disposal facility depending on decisions to be based on DOE's Final Waste Management Programmatic Environmental Impact Statement. Evaluation of impacts on land use, socio-economics, cultural resources, aesthetic and scenic resources, geology, air resources, water resources, ecological resources, noise, traffic and transportation, occupational and public health and safety, INEEL services, and environmental justice were included in the assessment. The AMWTP DEIS identifies as the Preferred Alternative the Proposed Action, which is the construction and operation of the AMWTP facility

  14. Environmental Resources of Selected Areas of Hawaii: Ecological Resources (DRAFT)

    Energy Technology Data Exchange (ETDEWEB)

    Trettin, C.C.; Tolbert, V.R.; Jones, A.T.; Smith, C.R.; Kalmijn, A.J.

    1994-06-01

    This report has been prepared to make available and archive the background scientific data and related information collected on ecological resources during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The U.S. Department of Energy (COE) published a notice in the Federal Register on May 17, 1994 (Fed. Regist. 5925638) withdrawing its Notice of Intent (Fed. Regst. 575433) of February 14, 1992, to prepare the HGP-EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. The background scientific data and related information presented in this report focus on several areas of Hawaii County, including the southeastern coast, a potential development corridor along the Saddle Road between Hilo and the North Kohala District on the northwestern coast, and on the southeastern coast of Maui. In this report, reference is made to these areas as study areas rather than as areas where proposed or alternative facilities of the HGP would be located. The resource areas addressed herein include terrestrial ecology, aquatic ecology, and marine ecology. The scientific background data and related information is being made available for future research in these areas. This report describes the environmental resources present in the areas studied (i.e., the affected environment) and does not represent an assessment of environmental impacts.

  15. Waste Isolation Pilot Plant: Draft Supplement Environmental Impact Statement

    International Nuclear Information System (INIS)

    1989-04-01

    The US Department of Energy (DOE) has prepared this supplement to the 1980 Final Environmental Impact Statement (FEIS) for the Waste Isolation Pilot Plant (WIPP) in order to assess the environmental impacts that may occur from the continued development of the WIPP as a minced geologic repository for transuranic (TRU) waste. Since the publication of the FEIS in October 1980, new data collected at the WIPP have led to changes in the understanding of the hydrogeologic characteristics of the area and their potential implications for the long-term performance of the WIPP. In addition, there have been changes in the FEIS Proposed Action and new regulatory requirements. This supplement to the FEIS (SEIS) evaluates the environmental consequences of the Proposed Action as modified since 1980 in light of new data and assumptions. The new information pertains mainly to the geologic and hydrologic systems at the WIPP site and their effect on the long-term performance of the WIPP. The SEIS includes new data indicating that: the permeability of the Salado Formation, the geologic formation in which the WIPP underground facilities are located, is lower than previously believed; the moisture content of the Salado Formation and the consequent brine inflow is higher than previously believed; a higher transmissivity zone is present in the Rustler Formation in the southeastern portion of the WIPP site; and ''salt creep'' (convergence) in the repository occurs faster than previously believed. Volume 2 contains 11 appendices

  16. Stuart oil shale project stage two: executive summary: draft environmental impact statement

    International Nuclear Information System (INIS)

    1999-09-01

    The project is an oil shale open pit mine and processing operation that is currently being commissioned 15 km north of Gladstone, Queensland, Australia, and is owned as a joint venture by Southern Pacific Petroleum N.L., Central Pacific Minerals N.L, and Suncor Energy Inc., a leading Canadian company that is an integrated energy company. The results of a comprehensive investigation are included of the potential environmental impacts of the project, and which are described in the Draft Environmental Impact Statement (EIS). In stage two, there is included the existing mine expansion as well as the construction of an additional process plant based around a larger commercial scale ATP oil shale processing plant. The new stage two operation will be developed next to and integral with services and infrastructure provided for stage one. Described are: the assessment process, regulatory framework and the project area, the needs for an alternative to the project, the proposal itself, the existing natural, social and economic impacts, and the environmental impacts as well as plans for their mitigation. In appendices there are included a draft environmental management overview strategy and an environmental management plan. The elements covered in the report by section are: background, need for the project, the proponent, legislation and approvals, project description, environmental issues and impact management

  17. Surplus plutonium disposition draft environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1998-07-01

    On May 22, 1997, DOE published a Notice of Intent (NOI) in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS). DOE's disposition strategy allows for both the immobilization of surplus plutonium and its use as mixed oxide (MOX) fuel in existing domestic, commercial reactors. The disposition of surplus plutonium would also involve disposal of the immobilized plutonium and MOX fuel (as spent nuclear fuel) in a geologic repository. The Surplus Plutonium Disposition Environmental Impact Statement analyzes alternatives that would use the immobilization approach (for some of the surplus plutonium) and the MOX fuel approach (for some of the surplus plutonium); alternatives that would immobilize all of the surplus plutonium; and the No Action Alternative. The alternatives include three disposition facilities that would be designed so that they could collectively accomplish disposition of up to 50 metric tons (55 tons) of surplus plutonium over their operating lives: (1) the pit disassembly and conversion facility would disassemble pits (a weapons component) and convert the recovered plutonium, as well as plutonium metal from other sources, into plutonium dioxide suitable for disposition; (2) the immobilization facility would include a collocated capability for converting nonpit plutonium materials into plutonium dioxide suitable for immobilization and would be located at either Hanford or SRS. DOE has identified SRS as the preferred site for an immobilization facility; (3) the MOX fuel fabrication facility would fabricate plutonium dioxide into MOX fuel. Volume 2 contains the appendices to the report and describe the following: Federal Register notices; contractor nondisclosure statement; adjunct melter

  18. Disposition of surplus highly enriched uranium: Draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-10-01

    This document assesses the environmental impacts at four potential sites that may result from alternatives for the disposition of United States-origin weapons-usable highly enriched uranium (HEU) that has been or may be declared surplus to national defense or defense-related program needs. In addition to the no action alternative, it assesses four alternatives that would eliminate the weapons-usability of HEU by blending it with depleted uranium, natural uranium, or low-enriched uranium (LEU) to create low-enriched uranium, either as commercial reactor fuel feedstock or as low-level radioactive waste. The potential blending sites are DOE's Y-12 Plant at Oak Ridge Reservation in Oak Ridge, Tennessee; DOE's Savannah River Site in Aiken, South Carolina; the Babcock ampersand Wilcox Naval Nuclear Fuel Division Facility in Lynchburg, Virginia; and the Nuclear Fuel Services Fuel Fabrication Plant in Erwin, Tennessee. Evaluations of impacts on site infrastructure, water resources, air quality and noise, socioeconomic resources, waste management, public and occupational health, and environmental justice for the potential blending sites are included in the assessment. The intersite transportation of nuclear and hazardous materials is also assessed. The preferred alternative is to blend down surplus HEU to LEU for maximum commercial use as reactor fuel feed which would likely be done at a combination of DOE and commercial sites

  19. Environmental Resources of Selected Areas of Hawaii: Socioeconomics (DRAFT)

    Energy Technology Data Exchange (ETDEWEB)

    Saulsbury, J.W.; Sorensen, B.M.; Schexnayder, S.M.

    1994-06-01

    This report has been prepared to make available and archive the background information on socioeconomic resources collected during the preparation of the Environmental Impact Statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The U.S. Department of Energy (DOE) published a notice in the Federal Register on May 17, 1994 (Fed. Regis. 5925638), withdrawing its Notice of Intent (Fed Regis. 57:5433), of February 14, 1992, to prepare the HGPEIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This document provides background information on socioeconomic resources in Hawaii County, with particular emphasis on the Puna District (Fig. 1). Information is being made available for use by others in conducting future socioeconomic impact assessments in this area. This report describes existing socioeconomic resources in the areas studied (i.e., the affected environment) and does not represent an assessment of environmental impacts. The socioeconomic resources described are primarily those that would be affected by employment and population growth associated with any future large-scale development. These resource categories are (1) population, (2) housing, (3) land use, (4) economic structure (primarily employment and income), (5) infrastructure and public services (education, ground transportation, police and fire protection, water, wastewater, solid waste disposal, electricity, and emergency planning), (6) local government revenues and expenditures, and (7) tourism and recreation.

  20. Draft environmental assessment of Argonne National Laboratory, East

    Energy Technology Data Exchange (ETDEWEB)

    1975-10-01

    This environmental assessment of the operation of the Argonne National Laboratory is related to continuation of research and development work being conducted at the Laboratory site at Argonne, Illinois. The Laboratory has been monitoring various environmental parameters both offsite and onsite since 1949. Meteorological data have been collected to support development of models for atmospheric dispersion of radioactive and other pollutants. Gaseous and liquid effluents, both radioactive and non-radioactive, have been measured by portable monitors and by continuous monitors at fixed sites. Monitoring of constituents of the terrestrial ecosystem provides a basis for identifying changes should they occur in this regime. The Laboratory has established a position of leadership in monitoring methodologies and their application. Offsite impacts of nonradiological accidents are primarily those associated with the release of chlorine and with sodium fires. Both result in releases that cause no health damage offsite. Radioactive materials released to the environment result in a cumulative dose to persons residing within 50 miles of the site of about 47 man-rem per year, compared to an annual total of about 950,000 man-rem delivered to the same population from natural background radiation. 100 refs., 17 figs., 33 tabs.

  1. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 1. Main report

    International Nuclear Information System (INIS)

    1998-07-01

    The Draft Environmental Impact Statement (EIS) for the replacement of the Australian Research reactor has been released. An important objective of the EIS process is to ensure that all relevant information has been collected and assessed so that the Commonwealth Government can make an informed decision on the proposal. The environmental assessment of the proposal to construct and operate a replacement reactor described in the Draft EIS has shown that the scale of environmental impacts that would occur would be acceptable, provided that the management measures and commitments made by ANSTO are adopted. Furthermore, construction and operation of the proposed replacement reactor would result in a range of benefits in health care, the national interest, scientific achievement and industrial capability. It would also result in a range of benefits derived from increased employment and economic activity. None of the alternatives to the replacement research reactor considered in the Draft EIS can meet all of the objectives of the proposal. The risk from normal operations or accidents has been shown to be well within national and internationally accepted risk parameters. The dose due to reactor operations would continue to be small and within regulatory limits. For the replacement reactor, the principle of 'As Low As Reasonably Achievable' would form an integral part of the design and licensing process to ensure that doses to operators are minimized. Costs associated with the proposal are $286 million (in 1997 dollars) for design and construction. The annual operating and maintenance costs are estimated to be $12 million per year, of which a significant proportion will be covered by commercial activities. The costs include management of the spent fuel from the replacement reactor as well as the environmental management costs of waste management, safety and environmental monitoring. Decommissioning costs for the replacement reactor would arise at the end of its lifetime

  2. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 1. Main report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Draft Environmental Impact Statement (EIS) for the replacement of the Australian Research reactor has been released. An important objective of the EIS process is to ensure that all relevant information has been collected and assessed so that the Commonwealth Government can make an informed decision on the proposal. The environmental assessment of the proposal to construct and operate a replacement reactor described in the Draft EIS has shown that the scale of environmental impacts that would occur would be acceptable, provided that the management measures and commitments made by ANSTO are adopted. Furthermore, construction and operation of the proposed replacement reactor would result in a range of benefits in health care, the national interest, scientific achievement and industrial capability. It would also result in a range of benefits derived from increased employment and economic activity. None of the alternatives to the replacement research reactor considered in the Draft EIS can meet all of the objectives of the proposal. The risk from normal operations or accidents has been shown to be well within national and internationally accepted risk parameters. The dose due to reactor operations would continue to be small and within regulatory limits. For the replacement reactor, the principle of `As Low As Reasonably Achievable` would form an integral part of the design and licensing process to ensure that doses to operators are minimized. Costs associated with the proposal are $286 million (in 1997 dollars) for design and construction. The annual operating and maintenance costs are estimated to be $12 million per year, of which a significant proportion will be covered by commercial activities. The costs include management of the spent fuel from the replacement reactor as well as the environmental management costs of waste management, safety and environmental monitoring. Decommissioning costs for the replacement reactor would arise at the end of its lifetime

  3. Preliminary environmental site assessments in New York City

    International Nuclear Information System (INIS)

    Lundy, P.; Gasson, D.R.; Longendyke, S.T.

    1991-01-01

    Preliminary Environmental Site Assessments are often performed prior to real estate transactions or refinancing. These assessments are typically performed for real estate buyers, sellers and lending institutions. Undertaking a Preliminary Environmental Site Assessment in New York City can often be quite complex and time-consuming. This is due, in part, to the age and density of buildings in the city as well as the myriad of regulatory agencies with jurisdiction over environmental issues. This paper will discuss how environmental assessments are performed with a special emphasis on building in New York City. In includes hazardous wastes management for Radon, PCB's and asbestos

  4. Surplus plutonium disposition draft environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1998-07-01

    On May 22, 1997, DOE published a Notice of Intent (NOI) in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS). DOE's disposition strategy allows for both the immobilization of surplus plutonium and its use as mixed oxide (MOX) fuel in existing domestic, commercial reactors. The disposition of surplus plutonium would also involve disposal of the immobilized plutonium and MOX fuel (as spent nuclear fuel) in a geologic repository. The Surplus Plutonium Disposition Environmental Impact Statement analyzes alternatives that would use the immobilization approach (for some of the surplus plutonium) and the MOX fuel approach (for some of the surplus plutonium); alternatives that would immobilize all of the surplus plutonium; and the No Action Alternative. The alternatives include three disposition facilities that would be designed so that they could collectively accomplish disposition of up to 50 metric tons (55 tons) of surplus plutonium over their operating lives: (1) the pit disassembly and conversion facility would disassemble pits (a weapons component) and convert the recovered plutonium, as well as plutonium metal from other sources, into plutonium dioxide suitable for disposition; (2) the immobilization facility would include a collocated capability for converting nonpit plutonium materials into plutonium dioxide suitable for immobilization and would be located at either Hanford or SRS. DOE has identified SRS as the preferred site for an immobilization facility; (3) the MOX fuel fabrication facility would fabricate plutonium dioxide into MOX fuel

  5. Transmission System Vegetation Management Program. Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1999-01-01

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for Bonneville and the public, and interfere with their ability to maintain these facilities. They need to (1) keep vegetation away from the electric facilities; (2) increase their program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools they can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planning Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management

  6. Environmental Resources of Selected Areas of Hawaii: Geological Hazards (DRAFT)

    Energy Technology Data Exchange (ETDEWEB)

    Staub, W.P.

    1994-06-01

    This report has been prepared to make available and archive the background scientific data and related information collected on geologic hazards during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The U.S. Department of Energy (DOE) published a notice in the Federal Register on May 17, 1994 (Fed Regis. 5925638) withdrawing its Notice of Intent (Fed Regis. 575433) of February 14, 1992, to prepare the HGP-EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated This report presents a review of current information on geologic hazards in the Hawaiian Islands. Interrelationships among these hazards are discussed. Probabilities of occurrence of given geologic hazards are provided in various regions where sufficient geologic or historical data are available. Most of the information contained herein is compiled from recent U.S. Geological Survey (USGS) publications and open-file reports. This report describes the natural geologic hazards present in the area and does not represent an assessment of environmental impacts. Geologic hazards originate both onshore and offshore. Onshore geologic hazards such as volcanic eruptions, earthquakes, surface rupture, landslides, uplift, and subsidence occur mainly on the southern third of the island of Hawaii (hereinafter referred to as Hawaii). Offshore geologic hazards are more widely distributed throughout the Hawaiian Islands. Examples of offshore geologic hazards are submarine landslides, turbidity currents, and seismic sea waves (tsunamis). First, overviews of volcanic and earthquake activity, and details of offshore geologic hazards is provided for the Hawaiian Islands. Then, a more detailed discussion of onshore geologic hazards is presented with special emphasis on the southern third of Hawaii and the east rift

  7. Draft Environmental Impact Statement. MX Deployment Area Selection and Land Withdrawal/Acquisition DEIS. Volume IV. Part II. Environmental Consequences to the Study Regions and Operating Base Vicinities.

    Science.gov (United States)

    1980-12-01

    Subtitle) 5. TYPE OF REPORT & PERIOD COVERED Draft Environmental Impact Statement-MX Draft-December 80 Deployment Alea Selection-Environmental...recreation, a weekend at the lake, the opportunity to be alone with yourself and your family, the clean air to see the next mountain and the freedom to...traffic volumes and projected traffic volumes during the peak construction year. In mountain passes, where capacity is severely reduced by steep grades

  8. Nez Perce Tribal Hatchery Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Nez Perce Tribal Hatchery (Idaho).

    1996-06-01

    Bonneville Power Administration, the Bureau of Indian Affairs, the Nez Perce Tribe propose a supplementation program to restore chinook salmon to the Clearwater River Subbasin in Idaho. The Clearwater River is a tributary to the Snake River, which empties into the Columbia River. The Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities. Spring, summer and fall chinook salmon would be reared and acclimated to different areas in the Subbasin and released at the hatchery and satellite sites or in other watercourses throughout the Subbasin. The supplementation program differs from other hatchery programs because the fish would be released at different sizes and would return to reproduce naturally in the areas where they are released. Several environmental issues were identified during scoping: the possibility that the project would fail if mainstem Columbia River juvenile and adult passage problems are not solved; genetic risks to fish listed as endangered or threatened; potential impacts to wild and resident fish stocks because of increase competition for food and space; and water quality. The Proposed Action would affect several important aspects of Nez Perce tribal life, primarily salmon harvest, employment, and fisheries management.

  9. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  10. Nez Perce Tribal Hatchery Program. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-06-01

    Bonneville Power Administration, the Bureau of Indian Affairs, and the Nez Perce Tribe propose a supplementation program to restore chinook salmon to the Clearwater River Subbasin in Idaho. The Clearwater River is a tributary to the Snake River, which empties into the Columbia River. The Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities. Several environmental issues were identified during scoping: the possibility that the project would fail if mainstem Columbia river juvenile and adult passage problems are not solved; genetic risks to fish listed as endangered or threatened; potential impacts to wild and resident fish stocks because of increased competition for food and space; and water quality. The Proposed Action would affect several important aspects of Nez Perce tribal life, primarily salmon harvest, employment, and fisheries management. Impacts to cultural resources can be avoided so impacts would be low. Soil impacts would be localized and their effects would be local and temporary during construction. Impacts to water quality would be low. Mitigation would be used if impacts to groundwater or surface water are greater than anticipated. No impacts to floodplains are expected. Impacts to all categories of fish range from no to high impacts

  11. Nez Perce Tribal Hatchery Program: Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-06-01

    Bonneville Power Administration, the Bureau of Indian Affairs, the Nez Perce Tribe propose a supplementation program to restore chinook salmon to the Clearwater River Subbasin in Idaho. The Clearwater River is a tributary to the Snake River, which empties into the Columbia River. The Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities. Spring, summer and fall chinook salmon would be reared and acclimated to different areas in the Subbasin and released at the hatchery and satellite sites or in other watercourses throughout the Subbasin. The supplementation program differs from other hatchery programs because the fish would be released at different sizes and would return to reproduce naturally in the areas where they are released. Several environmental issues were identified during scoping: the possibility that the project would fail if mainstem Columbia River juvenile and adult passage problems are not solved; genetic risks to fish listed as endangered or threatened; potential impacts to wild and resident fish stocks because of increase competition for food and space; and water quality. The Proposed Action would affect several important aspects of Nez Perce tribal life, primarily salmon harvest, employment, and fisheries management

  12. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  13. 2004 Power marketing program draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-04-01

    The Western Area Power Administration (Western), created in 1977 under the Department of Energy (DOE) Organization Act, markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of power from the Central Valley Project (CVP) and other sources, and markets available nonfirm energy from the Washoe Project. The Sierra Nevada Region's marketing area is shown in Figure 1. 1. Western's mission is to sell and deliver electricity that is in excess of Project Use (power required for project operations), which for the Sierra Nevada Region is generated from CVP and Washoe Project powerplants. Western's power marketing responsibility includes managing the Federal transmission system. The hydroelectric generation facilities of the CVP are operated by the Bureau of Reclamation (Reclamation). Reclamation manages and releases water in accordance with the various acts authorizing specific projects and with other laws and enabling legislation. Western's capacity and energy sales must be in conformance with the laws that govern its sale of electrical power. Hydropower operations at each facility must comply with minimum and maximum flows and other constraints set by Reclamation, the U.S. Fish and Wildlife Service (the Service), or other regulatory agencies, acting in accordance with law or policy. This EIS describes the environmental consequences of the range of reasonable marketing alternatives that meet the needs and purposes of the proposed marketing plan

  14. Transportation of radionuclides in urban environs: draft environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    Finley, N.C.; Aldrich, D.C.; Daniel, S.L.; Ericson, D.M.; Henning-Sachs, C.; Kaestner, P.C.; Ortiz, N.R.; Sheldon, D.D.; Taylor, J.M.

    1980-07-01

    This report assesses the environmental consequences of the transportation of radioactive materials in densely populated urban areas, including estimates of the radiological, nonradiological, and social impacts arising from this process. The chapters of the report and the appendices which follow detail the methodology and results for each of four causative event categories: incident free transport, vehicular accidents, human errors or deviations from accepted quality assurance practices, and sabotage or malevolent acts. The numerical results are expressed in terms of the expected radiological and economic impacts from each. Following these discussions, alternatives to the current transport practice are considered. Then, the detailed analysis is extended from a limited area of New York city to other urban areas. The appendices contain the data bases and specific models used to evaluate these impacts, as well as discussions of chemical toxicity and the social impacts of radioactive material transport in urban areas. The latter are evaluated for each causative event category in terms of psychological, sociological, political, legal, and organizational impacts. The report is followed by an extensive bibliography covering the many fields of study which were required in performing the analysis.

  15. Draft environmental statement related to the operation of Millstone Nuclear Power Station, Unit No. 3 (Docket No. 50-423)

    International Nuclear Information System (INIS)

    1984-07-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of Millstone Nuclear Power Station, Unit 3, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  16. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    International Nuclear Information System (INIS)

    Chareyron, Bruno

    2012-01-01

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 μSv/h compared to 0.15 μSv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  17. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    Energy Technology Data Exchange (ETDEWEB)

    Chareyron, Bruno

    2012-04-05

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 {mu}Sv/h compared to 0.15 {mu}Sv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  18. 76 FR 29263 - Draft Environmental Impact Statement for the Proposed Pueblo of Jemez 70.277-Acre Fee-to-Trust...

    Science.gov (United States)

    2011-05-20

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the... Jemez, intends to file a Draft Environmental Impact Statement (DEIS) with the U.S. Environmental... to be located within Do[ntilde]a Ana County, New Mexico. The document contained an error in the...

  19. Draft CSA standard on environmental risk assessments at class I nuclear facilities and uranium mines and mills

    International Nuclear Information System (INIS)

    Hart, D.; Garisto, N.; Parker, R.; Kovacs, R.; Thompson, B.

    2012-01-01

    The Canadian Standards Association (CSA) is preparing a draft Standard on environmental risk assessments (ERAs) at Class I nuclear facilities and uranium mines and mills (CSA N288.6). It is being prepared by a technical subcommittee of the CSA N288 Technical Committee, including experts from across the nuclear industry, government and regulatory authorities, and environmental service providers, among others. It addresses the design, implementation, and management of environmental risk assessment programs, and is intended to standardize practice across the industry. This paper outlines the scope of the draft Standard and highlights key features. It is under development and subject to change. (author)

  20. Final environmental impact statement: US Spent Fuel Policy. Comment letters on draft statements and major comments with DOE responses

    International Nuclear Information System (INIS)

    1980-05-01

    Notice of availability of the draft environmental impact statement for storage of US spent power reactor fuel was published by DOE in the Federal Register on September 6, 1978. A subsequent notice was published in the Federal Register on December 14, 1978, on the availability of the draft EISs on storage of foreign fuel, on charge for spent fuel storage, and a supplement to the draft EIS on storage of US fuel. Copies of the draft EISs were distributed for review and comment by appropriate Federal agencies, state governments, and other organizations and individuals who were known to have an interest in spent fuel storage activities and those who requested them. Comments and views concerning the draft EISs were requested from other interested agencies, organizations, and individuals by means of the Federal Register notices. Approximately 1600 copies each of the draft Domestic, Foreign, and Charge EISs were distributed for comment. The closing date for comments to be received on the draft EISs was February 15, 1979. Copies of the EISs (upon publication) and comment letters received were placed for public inspection in DOE public document rooms at 10 locations throughout the country. To the extent practicable, comments received after the closing date were also considered in the preparation of the final EIS. A total of 78 comment letters (some with supplements) were received. These comment letters are reproduced in their entirety in Section I of this volume. Approximately 600 specific comments were identified in these letters

  1. 75 FR 43496 - Department of the Army: Intent to Prepare a Draft Environmental Impact Statement for the General...

    Science.gov (United States)

    2010-07-26

    ... implementation of the alternative plans. The District will work as part of a team to include the New York State... Engineers, New York District (District), is preparing a Draft Environmental Impact Statement (DEIS) to...) document in accordance with the President's Council of Environmental Quality (CEQ) Rules and Regulations...

  2. 77 FR 2513 - Draft Environmental Impact Statement for Effects of Oil and Gas Activities in the Arctic Ocean

    Science.gov (United States)

    2012-01-18

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA934 Draft Environmental Impact Statement for Effects of Oil and Gas Activities in the Arctic Ocean AGENCY: National Marine... Environmental Impact Statement (DEIS) for the Effects of Oil and Gas Activities in the Arctic Ocean.'' Based on...

  3. 75 FR 3902 - Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact...

    Science.gov (United States)

    2010-01-25

    ... Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland... Environmental Management. [FR Doc. 2010-1306 Filed 1-22-10; 8:45 am] BILLING CODE 6450-01-P ... DEPARTMENT OF ENERGY Notice of Public Hearings on the Draft Tank Closure and Waste Management...

  4. 76 FR 40390 - Notice of Availability of a Draft Land Use Plan Amendment, Environmental Impact Statement and...

    Science.gov (United States)

    2011-07-08

    ... Environmental Impact Report for the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County... Statement (EIS) and Draft Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Project...: For further information and/or to have your name added to our mailing list, contact Cedric Perry, BLM...

  5. 78 FR 67187 - Notice of Availability of the Draft General Management Plan/Wilderness Study/Environmental Impact...

    Science.gov (United States)

    2013-11-08

    ... focus on protecting natural resources and systems. Under this alternative, most of the Big Spring... Availability of the Draft General Management Plan/ Wilderness Study/Environmental Impact Statement for the... Management Plan/Wilderness Study/Environmental Impact Statement (GMP/WS/EIS) for the Ozark National Scenic...

  6. 76 FR 75554 - Notice of Availability of the Draft Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for the Mount Hope Project, Eureka County, NV AGENCY: Bureau of Land Management... Impact Statement (EIS) for the Mount Hope Project and by this notice is announcing the opening of the... Mount Hope Project Draft EIS within 90 days following the date the Environmental Protection Agency...

  7. 75 FR 8046 - National Environmental Policy Act (NEPA) Draft Guidance, “Consideration of the Effects of Climate...

    Science.gov (United States)

    2010-02-23

    ..., ``Consideration of the Effects of Climate Change and Greenhouse Gas Emissions.'' AGENCY: Council On Environmental Quality. ACTION: Notice of Availability, Draft Guidance, ``Consideration of the Effects of Climate Change... visionary and versatile law that can be used effectively to address new environmental challenges facing our...

  8. 77 FR 17036 - Revised Notice of Intent To Prepare a Draft Environmental Impact Statement for the Bogue Banks...

    Science.gov (United States)

    2012-03-23

    ... alternatives to reduce coastal storm damages from beach erosion on Bogue Banks North Carolina. The Bogue Banks... Prepare a Draft Environmental Impact Statement for the Bogue Banks Coastal Storm Damage Reduction... shoreline, causing damage to structures and environmental resources. The proposed Bogue Banks Coastal Storm...

  9. Environmental Survey preliminary report, Solar Energy Research Institute, Golden, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1988-10-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the US Department of Energy's (DOE) Solar Energy Research Institute (SERI), conducted December 14 through 18, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by private contractors. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with SERI. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at SERI, and interviews with site personnel. 33 refs., 22 figs., 21 tabs.

  10. Environmental Survey preliminary report, Fermi National Accelerator Laboratory, Batavia, Illinois

    International Nuclear Information System (INIS)

    1988-10-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Fermi National Accelerator Laboratory (Fermilab), conducted September 14 through 25, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual participants for the Survey team are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Fermilab. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Fermilab, and interviews with site personnel. 110 refs., 26 figs., 41 tabs

  11. Environmental Survey preliminary report, Fermi National Accelerator Laboratory, Batavia, Illinois

    Energy Technology Data Exchange (ETDEWEB)

    1988-10-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Fermi National Accelerator Laboratory (Fermilab), conducted September 14 through 25, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual participants for the Survey team are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Fermilab. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Fermilab, and interviews with site personnel. 110 refs., 26 figs., 41 tabs.

  12. Towards new educational potentialities: Review and commentary of the Preliminary draft Act on higher education

    Directory of Open Access Journals (Sweden)

    Madžar Ljubomir

    2005-01-01

    Full Text Available The Higher Education Act is a long-awaited legal act. A number of uncompleted attempts to prepare it have been undertaken in the course of the last three years. So far without success. Having been and still being a matter of highest social priority, the renewed effort to create and subsequently to enact this act is welcome as a worthwhile and a highly productive endeavor. Welcome also are the main innovations offered by this act, particularly its conspicuous consistency with the Bologna Declaration and other internationally launched and accepted documents. The draft act follows the international documents tracing down the paths of the future development of the educational systems of the European countries and providing for their mutual compatibility. A number of other positive contributions of the draft act are singled out, such as introducing clear and rigorous criteria and procedures for accreditation and quality control, introducing a wide coverage of arts and sciences as a precondition for an institution of higher education to qualify as a university, flexibility in the regime of studying including the domestic and international mobility of the students and requirement for the schools of higher education to have large cores of permanently employed teaching staff. A much larger part of the paper is, however, devoted to critical commentaries. To begin with, the draft is produced without any participation of the private universities, which is seen as a form of discrimination. The organizational pattern of a university is laid out with insufficient clarity and the status of departments (faculties is particularly short of precision and even contradictory. The draft seems to be laden with the old bias towards excessive and potentially disastrous centralization, drastically reducing the decision making capacity of the system. The treatment of the property of the departments (faculties is found inconsistent and legally unfounded. Inconsistency is

  13. Gulf of Mexico sales 147 and 150: Central and western planning areas. Draft environmental impact statement. Volume 1. Sections I through IV.C. Draft report

    International Nuclear Information System (INIS)

    1993-04-01

    The Draft Environmental Impact Statement (EIS) covers the proposed 1994 Gulf of Mexico OCS oil and gas lease sales (Central Gulf of Mexico Sale 147 (March 1994) and Western Gulf of Mexico Sale 150 (August 1994)). The document includes the purpose and background of the proposed actions, the alternatives, the description of the affected environment, and the potential environmental impacts of the proposed actions and alternatives. Proposed mitigating measures and their effects are analyzed, in addition to potential cumulative impacts resulting from proposed activities

  14. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  15. Remedial action standards for inactive uranium processing sites (40 cfr 192). Draft environmental impact statement

    International Nuclear Information System (INIS)

    1980-12-01

    The Environmental Protection Agency is proposing standards for disposing of uranium mill tailings from inactive processing sites and for cleaning up contaminated open land and buildings. These standards were developed pursuant to the Uranium Mill Tailings Radiation Control Act of 1978 (Public Law 95-604). This Act requires EPA to promulgate standards to protect the environment and public health and safety from radioactive and nonradioactive hazards posed by uranium mill tailings at designated inactive processing sites. The Draft Environmental Impact Statement examines health, technical, cost, and other factors relevant to determining standards. The proposed standards for disposal of the tailings piles cover radon emissions from the tailings to the air, protection of surface and ground water from radioactive and nonradioactive contaminants, and the length of time the disposal system should provide a reasonable expectation of meeting these standards. The proposed cleanup standards limit indoor radon decay product concentrations and gamma radiation levels and the residual radium concentration of contaminated land after cleanup

  16. Draft environmental statement. Homestake Mining Company: Homestake Mining Company Pitch Project (Saguache County, Colorado)

    International Nuclear Information System (INIS)

    1978-01-01

    The draft concerns the proposed issuance of approvals, permits, and licenses to the Homestake Mining Company for the implementation of the Pitch Project. The Pitch Project consists of mining and milling operations involving uranium ore deposits located in Gunnison National Forest, Saguache County, Colorado. Mining of uranium ore will take place over an estimated period of 20 years; a mill with a nominal capacity of 544 metric tons per day (600 tons per day) will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 544 metric tons per day (600 tons per day), will be buried onsite at the head end of a natural valley. The environmental impacts are summarized in sections on the existing environment, applicant's proposed mining and milling operation, environmental effects of accidents, monitoring programs, productivity, commitment of resources, alternatives, and cost-benefit evaluation

  17. Preliminary Steps Towards Integrating Climate and Land Use (ICLUS): the Development of Land-Use Scenarios Consistent with Climate Change Emissions Storylines (2008, External Review Draft)

    Science.gov (United States)

    This report was prepared by the Global Change Research Program (GCRP) in the National Center for Environmental Assessment (NCEA) of the Office of Research and Development (ORD) at the U.S. Environmental Protection Agency (EPA). This draft report is a description of the methods u...

  18. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  19. Environmental Survey preliminary report, Sandia National Laboratories, Livermore, California

    International Nuclear Information System (INIS)

    1988-01-01

    This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Sandia National Laboratories Livermore (SNLL), located at Livermore, California. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The SNLL Survey is a portion of the larger, comprehensive DOE Environmental Survey encompassing all major operating facilities of DOE. The DOE Environmental Survey is one of a series of initiatives announced on September 18, 1985, by Secretary of Energy, John S. Herrington, to strengthen the environmental, safety, and health programs and activities within DOE. The purpose of the Environmental Survey is to identify, via a ''no fault'' baseline Survey of all the Department's major operating facilities, environmental problems and areas of environmental risk. The identified problem areas will be prioritized on a Department-wide basis in order of importance in 1989. The findings in this report are subject to modification based on the results from the Sampling and Analysis Phase of the Survey. The findings are also subject to modification based on comments from the Albuquerque Operations Office concerning the technical accuracy of the findings. The modified preliminary findings and any other appropriate changes will be incorporated into an Interim Report. The Interim Report will serve as the site-specific source for environmental information generated by the Survey, and ultimately as the primary source of information for the DOE-wide prioritization of environmental problems in the Survey Summary Report. 43 refs., 21 figs., 24 tabs

  20. Draft environmental assessment: Richton Dome site, Mississippi. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy identified the Richton dome site as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Richton dome site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations reported in this draft EA, the DOE has found that the Richton dome site is not disqualified under the guidelines. The site is in the Gulf Interior Region of the Gulf Coastal Plain. This setting contains two other potentially acceptable sites - the Cypress Creek dome site and the Vacherie dome site. Although these other two sites appear to be suitable for site characterization, the DOE has concluded that the Richton dome site is the preferred site in the Gulf Interior Region. Furthermore, the DOE finds that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is proposing to nominate the Richton dome site as one of five sites suitable for characterization. Having compared the Richton dome site with the other four sites proposed for nomination, the DOE has determined that the Richton dome site is not one of the three preferred sites for recommendation to the President as candidates for characterization

  1. 76 FR 59122 - Notice of Availability of a Draft Environmental Impact Statement in Cooperation With the North...

    Science.gov (United States)

    2011-09-23

    ... DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Notice of Availability of a Draft Environmental Impact Statement in Cooperation With the North Carolina Department of Transportation for Improvements to the US 17 and Market Street (US 17 Business) Corridor in Northern New Hanover and Southern...

  2. 77 FR 26572 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Mohave County...

    Science.gov (United States)

    2012-05-04

    ... facilities include pad-mounted transformers, an underground 34.5-kilovolt (kV) electrical collection system... Wind Farm Project Draft EIS within 45 days following the date the Environmental Protection Agency... Wind Farm Project is the BLM Kingman Field Office. Cooperating agencies are the Western Area Power...

  3. 77 FR 25193 - Notice of Availability of the Draft Environmental Impact Statement for the Lost Creek Uranium In...

    Science.gov (United States)

    2012-04-27

    ...-166318] Notice of Availability of the Draft Environmental Impact Statement for the Lost Creek Uranium In... (EIS) for the Lost Creek Uranium In Situ Recovery (ISR) Project and by this notice is announcing the... subpart 3809 regulations to construct a uranium ore recovery plant, an access road to the site, and a...

  4. 76 FR 59423 - Drakes Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes...

    Science.gov (United States)

    2011-09-26

    ... commercial production, harvesting, processing, and sale of shellfish at Point Reyes National Seashore. The... Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes National... Drakes Bay Oyster Company Special-use permit in Drakes Estero, Point Reyes National Seashore, California...

  5. 78 FR 13643 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project...

    Science.gov (United States)

    2013-02-28

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project in San Joaquin and Contra Costa Counties... Joaquin County and Holland Tract and Webb Tract are located in Contra Costa County. A wetland delineation...

  6. Draft Genome Sequence of Exiguobacterium sp. Strain BMC-KP, an Environmental Isolate from Bryn Mawr, Pennsylvania.

    Science.gov (United States)

    Hyson, Peter; Shapiro, Joshua A; Wien, Michelle W

    2015-10-08

    Exiguobacterium sp. strain BMC-KP was isolated as part of a student environmental sampling project at Bryn Mawr College, PA. Sequencing of bacterial DNA assembled a 3.32-Mb draft genome. Analysis suggests the presence of genes for tolerance to cold and toxic metals, broad carbohydrate metabolism, and genes derived from phage. Copyright © 2015 Hyson et al.

  7. 77 FR 51981 - Notice of Intent To Prepare a Draft Environmental Impact Statement on the Construction and...

    Science.gov (United States)

    2012-08-28

    ... Draft Environmental Impact Statement on the Construction and Operation of the Everglades Agricultural... Basin (FEB) at the location of the Everglades Agricultural Area (EAA) A1 Reservoir project that was not... implementing the procedural requirements of NEPA (33 CFR part 230, USACE Engineering Regulation ER 200-2-2). A...

  8. 78 FR 37527 - Draft Environmental Impact Statement for the Disposition of Hangars 2 and 3, Fort Wainwright, Alaska

    Science.gov (United States)

    2013-06-21

    ... Statement (EIS) for the disposition of two historic hangars at Fort Wainwright (FWA). The Draft EIS analyzes and evaluates the potential environmental impacts associated with proposed disposition options for two historic World War II-era hangars (Hangars 2 and 3) and supporting infrastructure located on the Main Post...

  9. 78 FR 4164 - Draft Environmental Impact Statement for the Proposed Point Molate Resort and Casino for the...

    Science.gov (United States)

    2013-01-18

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the Proposed Point Molate Resort and Casino for the Guidiville Band of the Pomo Indians, Contra Costa County... Impact Statement (EIS) for the BIA Federal action of approving the fee-to- trust transfer and casino...

  10. 77 FR 24976 - Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino...

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino and Mixed Use Project, City of Airway Heights, Spokane... Impact Statement (DEIS) for the Spokane Tribe of Indians West Plains casino and mixed use project, City...

  11. 75 FR 67391 - Notice of Intent To Prepare a Draft Environmental Impact Statement for the West Coast Recycling...

    Science.gov (United States)

    2010-11-02

    ... a Draft Environmental Impact Statement for the West Coast Recycling Group Project in West Sacramento... (EIS/EIR) for the development of the West Coast Recycling Group project located at the Port of West... meeting date. SUPPLEMENTARY INFORMATION: Description of the Proposed Action The West Coast Recycling Group...

  12. 78 FR 79706 - Office of the Assistant Secretary-Water and Science; Draft Environmental Assessment of the...

    Science.gov (United States)

    2013-12-31

    ...; and updating pump stations and regulating ponds to accommodate the changing pattern of water demand... Assistant Secretary--Water and Science; Draft Environmental Assessment of the Proposed Increase in Operation, Maintenance and Replacement Activities Associated With the Wasatch County Water Efficiency Project AGENCY...

  13. 77 FR 11086 - Revised Notice of Intent To Prepare a Draft Environmental Impact Statement for the Brunswick...

    Science.gov (United States)

    2012-02-24

    ... evaluate the impacts of the proposed CSDR alternatives to reduce coastal storm damages from beach erosion... Prepare a Draft Environmental Impact Statement for the Brunswick County Beaches, NC, Coastal Storm Damage... conducting a General Reevaluation Report (GRR) for the Brunswick County Beaches, NC, Coastal Storm Damage...

  14. 75 FR 35079 - Notice of Correction to Notice of Availability of the Draft Environmental Impact Statement/Staff...

    Science.gov (United States)

    2010-06-21

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 49537, LLCAD08000, L51030000.FX0000, LVRAB109AA02] Notice of Correction to Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment to the California Desert Conservation Area Plan for the Calico Solar (Formerly SES Solar One...

  15. 75 FR 8105 - Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the...

    Science.gov (United States)

    2010-02-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 47740, LLCAD07000, L51030000.FX0000, LVRAB109AA01] Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the Stirling Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment...

  16. 78 FR 6303 - Notice of Intent To Prepare a Supplemental Draft Environmental Impact Statement on the Effects of...

    Science.gov (United States)

    2013-01-30

    ..., 2010, NMFS, as lead agency, announced its intent to prepare an EIS analyzing the impacts to the human... Intent To Prepare a Supplemental Draft Environmental Impact Statement on the Effects of Oil and Gas Activities in the Arctic Ocean AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and...

  17. Proposed Columbia Wind Farm number-sign 1. Joint NEPA/SEPA draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm number-sign 1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue

  18. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan: Volume 2 of 4

    International Nuclear Information System (INIS)

    1996-08-01

    This appendix discusses the scope of actions addressed in the Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan. To address the purpose and need for agency action identified in Chapter 2.0 of the HRA-EIS, the scope includes an evaluation of the potential environmental impacts associated with the remedial actions to be conducted by the US Department of Energy (DOE) under the provisions of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1989). These remedial actions would bring the Hanford Site into compliance with the applicable requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA). The DOE program responsible for conducting remedial actions at the Hanford Site is referred to as the Richland Environmental Restoration (ER) Project. The Richland ER Project encompasses the following projects: radiation area remedial actions and underground storage tanks (UST); RCRA closures; single-shell tank (SST) closures; past-practice waste site operable unit (source and groundwater) remedial actions; surplus facility decommissioning; and waste storage and disposal facilities

  19. Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat County (Wash.)

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.

  20. Environmental Survey preliminary report, Argonne National Laboratory, Argonne, Illinois

    International Nuclear Information System (INIS)

    1988-11-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Argonne National Laboratory (ANL), conducted June 15 through 26, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with ANL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ANL, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S ampersand A) Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The S ampersand A Plan will be executed by the Oak Ridge National Laboratory (ORNL). When completed, the S ampersand A results will be incorporated into the Argonne National Laboratory Environmental Survey findings for inclusion in the Environmental Survey Summary Report. 75 refs., 24 figs., 60 tabs

  1. Environmental Survey preliminary report, Argonne National Laboratory, Argonne, Illinois

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Argonne National Laboratory (ANL), conducted June 15 through 26, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with ANL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ANL, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S A) Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The S A Plan will be executed by the Oak Ridge National Laboratory (ORNL). When completed, the S A results will be incorporated into the Argonne National Laboratory Environmental Survey findings for inclusion in the Environmental Survey Summary Report. 75 refs., 24 figs., 60 tabs.

  2. Environmental Survey preliminary report, Pinellas Plant, Largo, Florida

    International Nuclear Information System (INIS)

    1987-11-01

    The purpose of this report is to present the preliminary findings made during the Environmental Survey, conducted May 11 through 22, 1987, at the United States Department of Energy (DOE) Pinellas Plant in Largo, Florida. As a Preliminary Report, the contents are subject to revisions, which will be made in a forthcoming Interim Report, based on Albuquerque Operations Office review and comments on technical accuracy, the results of the sampling and analyses, and other information that may come to the Survey team's attention prior to issuance of the Interim Report. The Pinellas Plant is currently operated for DOE by the General Electric Company-Neutron Devices Department (GENDD). The Pinellas Survey is part of the larger DOE-wide Environmental Survey effort announced by Secretary John S. Herrington on September 18, 1985. The purpose of this effort is to identify, via ''no fault'' baseline Surveys, existing environmental problems are areas of environmental risk at DOE facilities and to rank them on a DOE-wide basis. This ranking will enable DOE to more effectively establish priorities for addressing environmental problems and allocate the resources necessary to correct these problems. Because the Survey is ''no fault'' and is not an ''audit,'' it is not designed to identify specific isolated incidents of noncompliance or to analyze environmental management practices. Such incidents and/or management practices will, however, be used in the Survey as a means of identifying existing and potential environmental problems. 55 refs., 37 figs., 37 tabs

  3. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

  4. Environmental Survey preliminary report, Pittsburgh Energy Technology Center, Pittsburgh, Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    1988-09-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Pittsburgh Energy Technology Center (PETC) conducted December 7--11, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with PETC. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at PETC, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S A) Plan to assist in further assessing certain environmental problems identified during its on-site Survey activities at PETC. The S A Plan will be executed by the Oak Ridge National Laboratory (ORNL). When completed, the Plan's results will be incorporated into the PETC Survey findings for inclusion into the Environmental Survey Summary Report. 64 refs., 23 figs., 29 tabs.

  5. Environmental Survey preliminary report, Kansas City Plant, Kansas City, Missouri

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE), Kansas City Plant (KCP), conducted March 23 through April 3, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the KCP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data observations of the operations performed at the KCP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the KCP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the KCP Survey. 94 refs., 39 figs., 55 tabs

  6. Environmental Survey preliminary report, Brookhaven National Laboratory, Upton, New York

    Energy Technology Data Exchange (ETDEWEB)

    1988-06-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Brookhaven National Laboratory (BNL) conducted April 6 through 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with BNL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at BNL, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Oak Ridge National Laboratory. When completed, the results will be incorporated into the BNL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the BNL Survey. 80 refs., 24 figs., 48 tabs.

  7. Environmental Survey preliminary report, Pantex Facility, Amarillo, Texas

    International Nuclear Information System (INIS)

    1987-09-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Pantex Facility, conducted November 3 through 14, 1986.The Survey is being conducted by an interdisciplinary team of environmental specialist, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Pantex Facility. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Pantex Facility, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Oak Ridge National Laboratory. When completed, the results will be incorporated into the Pantex Facility Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the Pantex Facility. 65 refs., 44 figs., 27 tabs

  8. Environmental Survey preliminary report, Kansas City Plant, Kansas City, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE), Kansas City Plant (KCP), conducted March 23 through April 3, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the KCP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data observations of the operations performed at the KCP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the KCP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the KCP Survey. 94 refs., 39 figs., 55 tabs.

  9. Environmental Survey preliminary report, Rocky Flats Plant, Golden, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1987-06-01

    This report presents the preliminary findings of the Environmental Survey of the United States Department of Energy (DOE), Rocky Flats Plant (RFP), conducted August 11 through 22, 1986. The Survey is being conducted by an multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the RFP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data observations of the operations carried on at RFP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activates. The Sampling and Analysis Plan is being executed by DOE's Oak Ridge National Laboratory. When completed, the results will be incorporated into the RFP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the RFP Survey. 75 refs., 24 figs., 33 tabs.

  10. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs

  11. Environmental Survey preliminary report, Rocky Flats Plant, Golden, Colorado

    International Nuclear Information System (INIS)

    1987-06-01

    This report presents the preliminary findings of the Environmental Survey of the United States Department of Energy (DOE), Rocky Flats Plant (RFP), conducted August 11 through 22, 1986. The Survey is being conducted by an multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the RFP. The Survey covers all environmental media and all areas of environmental regulations. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data observations of the operations carried on at RFP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activates. The Sampling and Analysis Plan is being executed by DOE's Oak Ridge National Laboratory. When completed, the results will be incorporated into the RFP Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the RFP Survey. 75 refs., 24 figs., 33 tabs

  12. Environmental Survey preliminary report, Feed Materials Production Center, Fernald, Ohio

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    This report presents the preliminary findings from the first phase of the environmental survey of the United States Department of Energy (DOE) Feed Materials Production Center (FMPC), conducted June 16 through 27, 1986. The survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the survey is to identify environmental problems and areas of environmental risk associated with the FMPC. The survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the survey involves the review of existing site environmental data, observations of the operations carried on at FMPC, and interviews with site personnel. The survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its onsite activities. The Sampling and Analysis Plan will be executed by a DOE national laboratory or a support contractor. When completed, the results will be incorporated into the FMPC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the FMPC survey. 41 refs., 20 figs., 25 tabs.

  13. Environmental Survey preliminary report, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1987-11-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the Department of Energy (DOE), Y-12 Plant, conducted November 10 through 21 and December 9 through 11, 1986. This Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Y-12 Plant. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Y-12, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the Y-12 Plant Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Y-12 Plant Survey. 80 refs., 76 figs., 61 tabs

  14. Environmental Survey preliminary report, Lawrence Livermore National Laboratory, Livermore, California

    Energy Technology Data Exchange (ETDEWEB)

    1987-12-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the Department of Energy (DOE) Lawrence Livermore National Laboratory (LLNL), conducted December 1 through 19, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with LLNL. The Survey covers all environmental media all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at LLNL, and interviews with site personnel. A Sampling and Analysis Plan was developed to assist in further assessing certain of the environmental problems identified during performance of on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory. When completed, the results will be incorporated into the LLNL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the LLNL Survey. 70 refs., 58 figs., 52 tabs.,

  15. Environmental Survey preliminary report, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1987-11-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the Department of Energy (DOE), Y-12 Plant, conducted November 10 through 21 and December 9 through 11, 1986. This Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Y-12 Plant. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Y-12, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the Y-12 Plant Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Y-12 Plant Survey. 80 refs., 76 figs., 61 tabs.

  16. Environmental Survey preliminary report, Pantex Facility, Amarillo, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Pantex Facility, conducted November 3 through 14, 1986.The Survey is being conducted by an interdisciplinary team of environmental specialist, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Pantex Facility. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Pantex Facility, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Oak Ridge National Laboratory. When completed, the results will be incorporated into the Pantex Facility Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the Pantex Facility. 65 refs., 44 figs., 27 tabs.

  17. Environmental Survey preliminary report, Brookhaven National Laboratory, Upton, New York

    International Nuclear Information System (INIS)

    1988-06-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Brookhaven National Laboratory (BNL) conducted April 6 through 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with BNL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at BNL, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Oak Ridge National Laboratory. When completed, the results will be incorporated into the BNL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the BNL Survey. 80 refs., 24 figs., 48 tabs

  18. The national strategy for an ecologic transition towards a sustainable development (SNTEDD) - Preliminary draft 2014-2020

    International Nuclear Information System (INIS)

    2014-01-01

    After having outlined that the ecologic transition is a requirement for economy and society, this document presents the nine main lines of the French national strategy for an ecologic transition towards a sustainable development. These main lines as well as the associated priorities (two to five priorities are associated with each main line) are discussed. Objectives and related public initiatives (plan, drafts, bill projects) are also mentioned. The nine main lines are: to develop sustainable and resilient territories, to commit to a circular and low-carbon economy, to prevent and to reduce environmental, social and land inequities, to invent new economic and financial models, to support the ecologic evolution of economic activities, to direct knowledge production, research and innovation towards ecologic transition, to teach, train and heighten awareness for ecologic transition, to mobilize actors at all levels, and to promote sustainable development at the European and world levels

  19. Environmental Survey preliminary report, Nevada Test Site, Mercury, Nevada

    International Nuclear Information System (INIS)

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Nevada Test Site (NTS), conducted June 22 through July 10, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the NTS. The Survey covers all environment media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations and activities performed at the NTS, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by the Battelle Columbus Division under contract with DOE. When completed, the results will be incorporated into the NTS Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the NTS Survey. 165 refs., 42 figs., 52 tabs

  20. Environmental Survey preliminary report, Stanford Linear Accelerator Center, Stanford, California

    Energy Technology Data Exchange (ETDEWEB)

    1988-07-01

    This report presents the preliminary findings from the first phase of the Survey of the US Department of Energy (DOE) Stanford Linear Accelerator Center (SLAC) at Stanford, California, conducted February 29 through March 4, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the SLAC. The Survey covers all environmental media and all areas of environmental regulation and is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations at the SLAC, and interviews with site personnel. The Survey team is developing a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the SLAC facility. The Interim Report will reflect the final determinations of the SLAC Survey. 95 refs., 25 figs., 25 tabs.

  1. Environmental Survey preliminary report, Nevada Test Site, Mercury, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Nevada Test Site (NTS), conducted June 22 through July 10, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the NTS. The Survey covers all environment media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations and activities performed at the NTS, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by the Battelle Columbus Division under contract with DOE. When completed, the results will be incorporated into the NTS Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the NTS Survey. 165 refs., 42 figs., 52 tabs.

  2. Environmental Survey preliminary report, Stanford Linear Accelerator Center, Stanford, California

    International Nuclear Information System (INIS)

    1988-07-01

    This report presents the preliminary findings from the first phase of the Survey of the US Department of Energy (DOE) Stanford Linear Accelerator Center (SLAC) at Stanford, California, conducted February 29 through March 4, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the SLAC. The Survey covers all environmental media and all areas of environmental regulation and is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations at the SLAC, and interviews with site personnel. The Survey team is developing a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the SLAC facility. The Interim Report will reflect the final determinations of the SLAC Survey. 95 refs., 25 figs., 25 tabs

  3. Draft supplement to final environmental statement related to construction and operation of Clinch River Breeder Reactor Plant. Docket No. 50-537

    International Nuclear Information System (INIS)

    1982-07-01

    Information is presented concerning the site and environs; facility description; environmental impacts due to construction; environmental impacts of plant operation; environmental measurement and monitoring programs; environmental impacts of postulated accidents; need for the proposed facility; alternatives; evaluation of the proposed action; and discussion of comments received on the draft environmental statement

  4. Environmental survey preliminary report, Mound Plant, Miamisburg, Ohio

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Mound Plant, conducted August 18 through 29, 1986. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Mound Plant. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Mound Plant, and interviews with site personnel. The Survey found no environmental problems at the Mound Plant that represent an immediate threat to human life. The environmental problems identified at the Mound Plant by the Survey confirm that the site is confronted with a number of environmental problems which are by and large a legacy from past practices at a time when environmental problems were less well understood. Theses problems vary in terms of their magnitude and risk, as described in this report. Although the sampling and analysis performed by the Mound Plant Survey will assist in further identifying environmental problems at the site, a complete understanding of the significance of some of the environmental problems identified requires a level of study and characterization that is beyond the scope of the Survey. Actions currently under way or planned at the site, particularly the Phase II activities of the Comprehensive Environmental Analysis and Response Program (CEARP) as developed and implemented by the Albuquerque Operations Office, will contribute toward meeting this requirement. 85 refs., 24 figs., 20 tabs.

  5. Environmental Survey preliminary report, Sandia National Laboratories, Livermore, California

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Sandia National Laboratories Livermore (SNLL), located at Livermore, California. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The SNLL Survey is a portion of the larger, comprehensive DOE Environmental Survey encompassing all major operating facilities of DOE. The DOE Environmental Survey is one of a series of initiatives announced on September 18, 1985, by Secretary of Energy, John S. Herrington, to strengthen the environmental, safety, and health programs and activities within DOE. The purpose of the Environmental Survey is to identify, via a no fault'' baseline Survey of all the Department's major operating facilities, environmental problems and areas of environmental risk. The identified problem areas will be prioritized on a Department-wide basis in order of importance in 1989. The findings in this report are subject to modification based on the results from the Sampling and Analysis Phase of the Survey. The findings are also subject to modification based on comments from the Albuquerque Operations Office concerning the technical accuracy of the findings. The modified preliminary findings and any other appropriate changes will be incorporated into an Interim Report. The Interim Report will serve as the site-specific source for environmental information generated by the Survey, and ultimately as the primary source of information for the DOE-wide prioritization of environmental problems in the Survey Summary Report. 43 refs., 21 figs., 24 tabs.

  6. Environmental Survey preliminary report, Portsmouth Uranium Enrichment Complex, Piketon, Ohio

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Portsmouth Uranium Enrichment Complex (PUEC), conducted August 4 through August 15, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Team specialists are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at PUEC, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Argonne National Laboratory. When completed, the results will be incorporated into the PUEC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the PUEC Survey. 55 refs., 22 figs., 21 tabs

  7. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ''Safety Measures for Waste Tanks at Hanford Nuclear Reservation,'' of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues

  8. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

  9. Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

  10. Environmental Survey preliminary report, Lawrence Berkeley Laboratory, Berkeley, California

    International Nuclear Information System (INIS)

    1988-07-01

    The purpose of this report is to present the preliminary findings made during the Environmental Survey, February 22--29, 1988, at the US Department of Energy (DOE) Lawrence Berkeley Laboratory (LBL) in Berkeley, California. The University of California operates the LBL facility for DOE. The LBL Survey is part of the larger DOE-wide Environmental Survey announced by Secretary John S. Herrington on September 18, 1985. The purpose of this effort is to identify, via ''no fault'' baseline Surveys, existing environmental problems and areas of environmental risk at DOE facilities, and to rank them on a DOE wide basis. This ranking will enable DOE to more effectively establish priorities for addressing environmental problems and allocate the resources necessary to correct them. Because the Survey is ''no fault'' and is not an ''audit,'' it is not designed to identify specific isolated incidents of noncompliance or to analyze environmental management practices. Such incidents and/or management practices will, however, be used in the Survey as a means of identifying existing and potential environmental problems. The LBL Survey was conducted by a multidisciplinary team of technical specialists headed and managed by a Team Leader and Assistant Team Leader from DOE's Office of Environmental Audit. A complete list of the LBL Survey participants and their affiliations is provided in Appendix A. 80 refs., 27 figs., 37 tabs

  11. Environmental Survey preliminary report, Lawrence Berkeley Laboratory, Berkeley, California

    Energy Technology Data Exchange (ETDEWEB)

    1988-07-01

    The purpose of this report is to present the preliminary findings made during the Environmental Survey, February 22--29, 1988, at the US Department of Energy (DOE) Lawrence Berkeley Laboratory (LBL) in Berkeley, California. The University of California operates the LBL facility for DOE. The LBL Survey is part of the larger DOE-wide Environmental Survey announced by Secretary John S. Herrington on September 18, 1985. The purpose of this effort is to identify, via no fault'' baseline Surveys, existing environmental problems and areas of environmental risk at DOE facilities, and to rank them on a DOE wide basis. This ranking will enable DOE to more effectively establish priorities for addressing environmental problems and allocate the resources necessary to correct them. Because the Survey is no fault'' and is not an audit,'' it is not designed to identify specific isolated incidents of noncompliance or to analyze environmental management practices. Such incidents and/or management practices will, however, be used in the Survey as a means of identifying existing and potential environmental problems. The LBL Survey was conducted by a multidisciplinary team of technical specialists headed and managed by a Team Leader and Assistant Team Leader from DOE's Office of Environmental Audit. A complete list of the LBL Survey participants and their affiliations is provided in Appendix A. 80 refs., 27 figs., 37 tabs.

  12. 78 FR 14117 - Draft Environmental Impact Statement/Environmental Impact Report for Yolo Bypass Salmonid Habitat...

    Science.gov (United States)

    2013-03-04

    ...The Bureau of Reclamation and California Department of Water Resources intend to prepare an environmental impact statement/ environmental impact report (EIS/EIR) for the implementation of actions I.6.1 and I.7 identified in the National Marine Fisheries Service's 2009 Biological Opinion and Conference Opinion on the Long-term Operation of the Central Valley Project and State Water Project Reasonable and Prudent Alternative. These actions consist of salmonid habitat restoration efforts within the lower Sacramento River basin and fish passage through the Yolo Bypass. We are seeking suggestions and information on the alternatives and topics to be addressed and any other important issues related to the proposed action.

  13. Environmental Survey preliminary report, Pinellas Plant, Largo, Florida

    Energy Technology Data Exchange (ETDEWEB)

    1987-11-01

    The purpose of this report is to present the preliminary findings made during the Environmental Survey, conducted May 11 through 22, 1987, at the United States Department of Energy (DOE) Pinellas Plant in Largo, Florida. As a Preliminary Report, the contents are subject to revisions, which will be made in a forthcoming Interim Report, based on Albuquerque Operations Office review and comments on technical accuracy, the results of the sampling and analyses, and other information that may come to the Survey team's attention prior to issuance of the Interim Report. The Pinellas Plant is currently operated for DOE by the General Electric Company-Neutron Devices Department (GENDD). The Pinellas Survey is part of the larger DOE-wide Environmental Survey effort announced by Secretary John S. Herrington on September 18, 1985. The purpose of this effort is to identify, via no fault'' baseline Surveys, existing environmental problems are areas of environmental risk at DOE facilities and to rank them on a DOE-wide basis. This ranking will enable DOE to more effectively establish priorities for addressing environmental problems and allocate the resources necessary to correct these problems. Because the Survey is no fault'' and is not an audit,'' it is not designed to identify specific isolated incidents of noncompliance or to analyze environmental management practices. Such incidents and/or management practices will, however, be used in the Survey as a means of identifying existing and potential environmental problems. 55 refs., 37 figs., 37 tabs.

  14. Draft Environmental Statement for decommissioning Humboldt Bay Power Plant, Unit No. 3 (Docket No. 50-133)

    International Nuclear Information System (INIS)

    1986-04-01

    This Draft Environmental Statement (DES) contains th assessment of the environmental impact associated with decommissioning the Humboldt Bay Power Plant Unit 3 located 4 miles southwest of the city of Eureka, Humboldt County, California. This DES is prepared pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. The proposed decommissioning would involve safe storage of the facility for about 30 years, after which the residual radioactivity would be removed so that the facility would be at levels of radioactivity acceptable for release of the facility to unrestricted access. 26 refs

  15. Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

    Energy Technology Data Exchange (ETDEWEB)

    Hugo, Jacques [Idaho National Lab. (INL), Idaho Falls, ID (United States); Forester, John [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gertman, David [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States); Medema, Heather [Idaho National Lab. (INL), Idaho Falls, ID (United States); Persensky, Julius [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whaley, April [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-08-01

    This report presents preliminary research results from the investigation into the development of new models and guidance for Concepts of Operations in advanced small modular reactor (AdvSMR) designs. AdvSMRs are nuclear power plants (NPPs), but unlike conventional large NPPs that are constructed on site, AdvSMRs systems and components will be fabricated in a factory and then assembled on site. AdvSMRs will also use advanced digital instrumentation and control systems, and make greater use of automation. Some AdvSMR designs also propose to be operated in a multi-unit configuration with a single central control room as a way to be more cost-competitive with existing NPPs. These differences from conventional NPPs not only pose technical and operational challenges, but they will undoubtedly also have regulatory compliance implications, especially with respect to staffing requirements and safety standards.

  16. Preliminary Mass Spectrometric Analysis of Uranium on Environmental Swipe Materials

    International Nuclear Information System (INIS)

    Cheong, Chang-Sik; Jeong, Youn-Joong; Ryu, Jong-Sik; Shin, Hyung-Seon; Cha, Hyun-Ju; Ahn, Gil-Hoon; Park, Il-Jin; Min, Gyung-Sik

    2006-01-01

    It is well-known that uranium and plutonium isotopic compositions of safeguards samples are very useful to investigate the history of nuclear activities. To strengthen the capabilities of environmental sampling analysis in the ROK through MOST/DOE collaboration, round robin test for uranium and plutonium was designed in 2003. As the first round robin test, a set of dried uranium-containing solutions (∼35ng and (∼300ng) was distributed to the participating laboratories in November of 2003, with results reported in April of 2004. The KBSI (Korea Basic Science Institute) and ORNL (Oak Ridge National Laboratory) are currently in the process of analyzing uranium on cotton swipes for the second round robin test. As a preliminary test for the second round, KBSI intends to analyze home-made swipe samples into which international uranium standards are added. Here we describe technical steps of sample preparation and mass spectrometry at KBSI, and report some results of the preliminary test

  17. 7 CFR 1780.55 - Preliminary engineering reports and Environmental Reports.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Preliminary engineering reports and Environmental..., Designing, Bidding, Contracting, Constructing and Inspections § 1780.55 Preliminary engineering reports and Environmental Reports. Preliminary engineering reports (PERs) must conform to customary professional standards...

  18. Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, Washington

    International Nuclear Information System (INIS)

    2003-01-01

    This ''Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement'' (HSW EIS) covers three primary aspects of waste management at Hanford--waste treatment, storage, and disposal. It also addresses four kinds of solid waste--low-level waste (LLW), mixed (radioactive and chemically hazardous) low-level waste (MLLW), transuranic (TRU) waste, and immobilized low-activity waste (ILAW). It fundamentally asks the question: how should we manage the waste we have now and will have in the future? This EIS analyzes the impacts of the LLW, MLLW, TRU waste, and ILAW we currently have in storage, will generate, or expect to receive at Hanford. The HSW EIS is intended to help us determine what specific facilities we will continue to use, modify, or construct to treat, store, and dispose of these wastes (Figure S.1). Because radioactive and chemically hazardous waste management is a complex, technical, and difficult subject, we have made every effort to minimize the use of acronyms (making an exception for our four waste types listed above), use more commonly understood words, and provide the ''big picture'' in this summary. An acronym list, glossary of terms, and conversions for units of measure are provided in a readers guide in Volume 1 of this EIS

  19. Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

    Energy Technology Data Exchange (ETDEWEB)

    Jacques Hugo; John Forester; David Gertman; Jeffrey Joe; Heather Medema; Julius Persensky; April Whaley

    2013-04-01

    This report presents preliminary research results from the investigation in to the development of new models and guidance for concepts of operations (ConOps) in advanced small modular reactor (aSMR) designs. In support of this objective, three important research areas were included: operating principles of multi-modular plants, functional allocation models and strategies that would affect the development of new, non-traditional concept of operations, and the requiremetns for human performance, based upon work domain analysis and current regulatory requirements. As part of the approach for this report, we outline potential functions, including the theoretical and operational foundations for the development of a new functional allocation model and the identification of specific regulatory requirements that will influence the development of future concept of operations. The report also highlights changes in research strategy prompted by confirmationof the importance of applying the work domain analysis methodology to a reference aSMR design. It is described how this methodology will enrich the findings from this phase of the project in the subsequent phases and help in identification of metrics and focused studies for the determination of human performance criteria that can be used to support the design process.

  20. Site study plan for Deep Hydronest Test Wells, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-05-01

    Wells called Deep Hydronest Wells will be installed at six locations at the Deaf Smith County Site to characterize hydraulic parameters in the geologic column between the top of the San Andres Formation and the base of Pennsylvanian System. Three hydronests will be drilled during early stages of site characterization to provide data for performance assessment modeling. Four wells are proposed for each of these 3 nests. Results of drilling, testing, and preliminary modeling will direct drilling and testing activities at the last 3 nests. Two wells are proposed at each of the last 3 nests for a total of 18 wells. The Salt Repository Project (SRP) Networks specify the schedule under which this program will operate. Drilling and hydrologic testing of the first Deep Hydronest will begin early in the Surface Investigation Program. Drilling and testing of the first three Deep Hydronests will require about 18 months. After 12 months of evaluating and analyzing data from the first three hydronests, the remaining three hydronests will be drilled during a 12-month period. The Technical Field Services Contractor is responsible for conducting the field program. Samples and data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be used to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 36 refs., 20 figs., 6 tabs

  1. Draft environmental impact statement: KENETECH/PacifiCorp Windpower Project, Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-01-01

    This Draft Environmental Impact Statement assesses the environmental consequences of a proposed windpower development project in Carbon County, between Arlington and Hanna, Wyoming. Public scoping commenced in January 1994. All issues raised during scoping and interdisciplinary team preparation of the analysis are addressed. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts resulting from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  2. Environmental Survey preliminary report, Savannah River Plant, Aiken, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Savannah River Plant (SRP), located at Aiken, South Carolina. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The following topics are discussed: general site information; air, soil, surface water and ground water; hydrogeology; waste management; toxic and chemical materials; release of tritium oxides; radioactivity in milk; contamination of ground water and wildlife; pesticide use; and release of radionuclides into seepage basins. 149 refs., 44 figs., 53 tabs.

  3. 77 FR 2096 - Notice of Availability of Draft Environmental Impact Statement for the Proposed International...

    Science.gov (United States)

    2012-01-13

    ... Center, 5101 Lovington Highway in Hobbs, New Mexico. For 1 hour prior to the public meeting, the NRC..., 5101 Lovington Highway in Hobbs, New Mexico. Informal Open House Session: 4:30-5:30 p.m. Draft EIS...

  4. Draft Environmental Statement related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1984-10-01

    This Draft Environmental Statement contains an assessment of the environmental impact associated with the operation of the Vogtle Electric Generating Plant, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, part 51 (10 CFR 51), as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation

  5. Technical procedures for the implementation of cultural resource site studies, Deaf Smith County, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-01-01

    Cultural resources at the Deaf Smith County site will be identified, evaluated and managed through the implementation of studies detailed in the Site Study Plan for Cultural Resources. This technical procedure outlines the conduct of pedestrian survey and the documentation of identified cultural resources. The purpose of the field surveys is to identify and document cultural resources in the areas that will be affected by site characterization activities and to record the environmental setting of identified cultural resources. Three pedestrian surveys will cover 100 percent of the on-site and off-site project areas. Survey 1 will provide coverage of the Repository Surface Facility (RSF) area, which includes the Exploratory Shaft Facility (ESF) and two linear engineering design borehole (EDBH) seismic survey corridors. Survey 2 will provide coverage of a 39 km 2 (15 mi 2 ) area that includes the 23 km 2 (9 mi 2 ) Deaf Smith County site plus a 0.4 to 0.8 kM (1/4 to 1/2 mi) border area but excludes the area covered by Survey 1. Survey 3 will cover offsite geotechnical test areas, such as the locations of playa boreholes, deep playa wells, hydrologic tests, site foundation borings, and their access routes. The purpose of site documentation or recording is to address the project information needs for land use permits and approvals, engineering design support, and cultural resource evaluation for National Register of Historic Places eligibility. Site documentation will consist of gathering sufficient data on identified resources to complete Texas Natural Resource Information System (TNRIS). 7 refs., 3 figs

  6. BPA/Puget Power Northwest Washington Transmission Project. Supplemental Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1995-04-01

    Bonneville Power Administration and Puget Sound Power ampersand Light Company propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the City of Bellingham, starting in 1995. The upgrades of the interconnected 230-kV and 115-kV systems are needed to increase the import capacity on a nearby U.S.-Canada 500-kV intertie by about 850 megawatts (MW). BPA and Puget Power would share the increase in north-south transfer capability. An existing BPA 230-kV single-circuit, wood-pole H-frame transmission line would be upgraded to a 230-kV lattice-steel double-circuit line. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993. New 1994 studies showed that other improvements to Puget Power's system, and the addition of local generation has lessened local reliability problems. Also in 1994, BPA reevaluated all existing projects with this goal in mind. BPA and Puget determined that benefits would still result from this project, and that additional transfer capacity and improved system integrity warrant the expenditures. Given the changes in need, BPA decided to issue a Supplemental DEIS, and provide a second public review-and-comment period. The proposed action is designated Option 1. Impacts would be low to moderate and localized. Effects on soils and water resources in sensitive areas would be low to moderate; there would be little increase in magnetic fields, noise levels would approximate existing levels; and land use and property value impacts would be low. Threatened and endangered species would not be adversely affected, and all proposed Sections in wetlands would be covered by Nationwide Permit. Visual and socioeconomic impacts would be low to moderate. No cultural resources listed on the National Register of Historic Places would be affected

  7. Generic environmental impact statement in support of rulemaking on radiological criteria for decommissioning of NRC-licensed nuclear facilities. Appendices; Draft report for comment -- Volume 2

    International Nuclear Information System (INIS)

    1994-08-01

    The action being considered in this draft Generic Environmental Impact Statement (GEIS) is an amendment to the Nuclear Regulatory Commission's (NRC) regulations in 10 CFR Part 20 to include radiological criteria for decommissioning of lands and structures at nuclear facilities. Under the National Environmental Policy Act (NEPA), all Federal agencies must consider the effect of their actions on the environment. To fulfill NRC's responsibilities under NEPA, the Commission is preparing this GEIS which analyzes alternative courses of action and the costs and impacts associated with those alternatives. In preparing the GEIS, the following approach was taken: (1) a listing was developed of regulatory alternatives for establishing radiological criteria for decommissioning; (2) for each alternative, a detailed analysis and comparison of incremental impacts, both radiological and nonradiological, to workers, members of the public, and the environment, and costs, were performed; and (3) based on the analysis of impacts and costs, preliminary recommendations were provided. Contained in the GEIS are recommendations related to the definition of decommissioning, the scope of rulemaking, the radiological criteria, restrictions on use, citizen participation, use of the GEIS in site-specific cases, and minimization of contamination

  8. Generic environmental impact statement in support of rulemaking on radiological criteria for decommissioning of NRC-licensed nuclear facilities. Main report; Draft report for comment: Volume 1

    International Nuclear Information System (INIS)

    1994-08-01

    The action being considered in this draft Generic Environmental Impact Statement (GEIS) is an amendment to the Nuclear Regulatory Commission's (NRC) regulations in 10 CFR Part 20 to include radiological criteria for decommissioning of lands and structures at nuclear facilities. Under the National Environmental Policy Act (NEPA), all Federal agencies must consider the effect of their actions on the environment. To fulfill NRC's responsibilities under NEPA, the Commission is preparing this GEIS which analyzes alternative courses of action and the costs and impacts associated with those alternatives. In preparing the GEIS, the following approach was taken: (1) a listing was developed of regulatory alternatives for establishing radiological criteria for decommissioning; (2) for each alternative, a detailed analysis and comparison of incremental impacts, both radiological and nonradiological, to workers, members of the public, and the environment, and costs, were performed; and (3) based on the analysis of impacts and costs, preliminary recommendations were provided. Contained in the GEIS are recommendations related to the definition of decommissioning, the scope of rulemaking, the radiological criteria, restrictions on use, citizen participation, use of the GEIS in site-specific cases, and minimization of contamination

  9. Preliminary environmental assessment for the satellite power system (SPS)

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-01

    A preliminary assessment of the impact of the Satellite Power System (SPS) on the environment is presented. Information that has appeared in documents referenced herein is integrated and assimilated. The state-of-knowledge as perceived from recently completed DOE-sponsored studies is disclosed, and prospective research and study programs that can advance the state-of-knowledge and provide an expanded data base for use in an assessment planned for 1980 are defined. Alternatives for research that may be implemented in order to achieve this advancement are also discussed in order that a plan can be selected which will be consistent with the fiscal and time constraints on the SPS Environmental Assessment Program. Health and ecological effects of microwave radiation, nonmicrowave effects on health and the environment (terrestrial operations and space operations), effects on the atmosphere, and effects on communications systems are examined in detail. (WHK)

  10. Draft Genome Sequence of Acinetobacter johnsonii C6, an Environmental Isolate Engaging in Interspecific Metabolic Interactions

    DEFF Research Database (Denmark)

    Kaas, Rolf Sommer; Mordhorst, Hanne; Leekitcharoenphon, Pimlapas

    2017-01-01

    Acinetobacter johnsonii C6 originates from creosote-polluted groundwater and performs ecological and evolutionary interactions with Pseudomonas putida in biofilms. The draft genome of A. johnsonii C6 is 3.7 Mbp and was shaped by mobile genetic elements. It reveals genes facilitating the biodegrad......Acinetobacter johnsonii C6 originates from creosote-polluted groundwater and performs ecological and evolutionary interactions with Pseudomonas putida in biofilms. The draft genome of A. johnsonii C6 is 3.7 Mbp and was shaped by mobile genetic elements. It reveals genes facilitating...

  11. 77 FR 60139 - Draft Environmental Impact Statement for the Proposed Pueblo of Jemez 70.277-Acre Fee-to-Trust...

    Science.gov (United States)

    2012-10-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the... all work on an Environmental Impact Statement (EIS) for the BIA Federal action of approving a 70.277 acre fee-to-trust transfer and casino project located within Do[ntilde]a Ana County, New Mexico. DATES...

  12. 75 FR 30423 - Draft Comprehensive Conservation Plan and Environmental Assessment; Canaan Valley National...

    Science.gov (United States)

    2010-06-01

    ... Mountain salamander and Indiana bat. Its dominant habitats include wet meadows, peatlands, shrub and... refuge revenue sharing payments, and continuing our role in land conservation partnerships. The draft CCP... wetland complex as a Research Natural Area. The hunt program would remain the same as alternative A...

  13. 77 FR 37438 - Draft Trail Management Plan and Environmental Impact Statement for Cuyahoga Valley National Park...

    Science.gov (United States)

    2012-06-21

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-MWR-CUVA-10100; 6065-4000-409] Draft Trail... Park Service, Interior. ACTION: Notice of Availability. SUMMARY: The National Park Service (NPS... blueprint to guide the expansion, elimination, restoration, management, and use of the trail system and its...

  14. 76 FR 9594 - Notice of Availability of the Draft Northern Arizona Proposed Withdrawal Environmental Impact...

    Science.gov (United States)

    2011-02-18

    ... least 15 days in advance through public notices, media releases, and/or mailings. ADDRESSES: You may..., regional, or national economy. The Draft EIS considers these issues in its analysis of four alternatives... resources, soundscapes, cultural resources, American Indian resources, wilderness, recreation, social, and...

  15. 76 FR 69758 - Draft Environmental Assessment, Incidental Take Plan, and Application for an Incidental Take...

    Science.gov (United States)

    2011-11-09

    ... (Grand Ballroom-Allagash and Aroostook rooms) (207) 768-9502; December 14 at Black Bear Inn, 4 Godfrey... requiring rehabilitation; and up to 5 could be killed (3 adults and 2 kittens indirectly killed because their mother was killed in a trap). The MDIFW draft ITP proposes various measures to minimize and...

  16. 77 FR 11154 - Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental...

    Science.gov (United States)

    2012-02-24

    ... BLM will announce future meetings or hearings and any other public participation activities at least..., Attention--Eastern Interior Draft RMP/EIS, Bureau of Land Management, 1150 University Avenue, Fairbanks... interior Alaska and is divided into four geographic areas: The Fortymile, Steese, Upper Black River, and...

  17. 78 FR 29124 - Draft Environmental Impact Statement (EIS) for the Implementation of Energy, Water, and Solid...

    Science.gov (United States)

    2013-05-17

    ... public comment period. Copies of the Draft EIS are available at the following libraries: Alamogordo Public Library, El Paso Main Library, Irving Schwartz Branch Library, New Mexico State University Zuhl Library, Richard Burges Branch Library, Thomas Branigan Memorial Library, and University of Texas at El...

  18. 76 FR 22724 - Draft Program Environmental Impact Statement/Environmental Impact Report (PEIS/R) and Public...

    Science.gov (United States)

    2011-04-22

    ...). The Draft PEIS/R document evaluates the direct, indirect, and cumulative effects of implementing the... fax at 916-978-5469, or e-mail at [email protected] . Additional information is available online at... Department of Fish and Game (DFG), will work to implement the Settlement. Reclamation, on behalf of the...

  19. Environmental and perceived stress in Australian dental undergraduates: Preliminary outcomes

    Directory of Open Access Journals (Sweden)

    Shannon Astill

    2016-12-01

    Full Text Available Background. Dental students have reported a high prevalence of psychological stress and the causes are associated with the challenging dental environmental and demographic factors. This study aimed to conduct a preliminary investigation on dental students’ stress status, using a sample of first-to-third-year Bachelor of Dental Surgery students in an Australian university. Special interests included causes of dental environmental stress and access to help services. Methods. A sample of 145 students was surveyed with a modified Dental Environmental Survey and Depression Anxiety Stress Scale in 2014. The participants’ demographic information was also collected. Results. The response rate was 95.4%. Second-year (P = 0.042, third-year (P < 0.001 and employed students (P = 0.027 were more likely to report stress resulting from transition to clinical learning. Third-year students were more often stressed about communicating and approaching staff (P = 0.023 as well as different opinions between staff (P < 0.001 and reduced holidays (P < 0.001. Students that were younger than 21 years of age (P = 0.001, that were first years (P < 0.001, and that were not in a relationship (P = 0.010 more often found difficulty of course work stressful. Students who were not in a relationship more often considered learning manual dexterity a source of stress (P = 0.034. Students previously seeking professional help were more likely to be stressed (P = 0.010. Conclusion. Causes of dental environment stress varied among years of study and demographic backgrounds. Professional support to stressed students should be enhanced. Further investigation is indicated.

  20. Draft Air Pathway Report: Phase 1 of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1990-07-20

    This report summarizes the air pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project, conducted by Battelle staff at the Pacific Northwest Laboratory under the direction of an independent Technical Steering Panel. The HEDR Project is estimating historical radiation doses that could have been received by populations near the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the air-pathway dose reconstruction sought to determine whether dose estimates could be calculated for populations in the 10 counties nearest the Hanford Site from atmospheric releases of iodine-131 from the site from 1944--1947. Phase 1 demonstrated the following: HEDR-calculated source-term estimates of iodine-131 releases to the atmosphere were within 20% of previously published estimates; calculated vegetation concentrations of iodine-131 agree well with previously published measurements; the highest of the Phase 1 preliminary dose estimates to the thyroid are consistent with independent, previously published estimates of doses to maximally exposed individuals; and relatively crude, previously published measurements of thyroid burdens for Hanford workers are in the range of average burdens that the HEDR model estimated for similar reference individuals'' for the period 1944--1947. 4 refs., 10 figs., 9 tabs.

  1. 78 FR 16655 - Draft Damage Assessment, Restoration Plan and Environmental Assessment for the T/B DBL 152 Oil...

    Science.gov (United States)

    2013-03-18

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Draft Damage Assessment...: National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of Availability of a Draft... natural resources. Under the federal Oil Pollution Act (OPA), the National Oceanic and Atmospheric...

  2. Preliminary draft: environmental impact statement for Hot Engineering Test Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Boyle, J.W.; Baxter, B.J.; Carpenter, J.A.

    1978-08-01

    The project considered is the Hot Engineering Test Project (HETP), which is to be located in largely existing facilities at Oak Ridge National Laboratory (ORNL). The project is a part of the National High Temperature Gas-Cooled Reactor Fuel Recycle Program, which seeks to demonstrate the technological feasibility of the recycle processes. The HETP will attempt to confirm the operability of the processes (proven feasible in cold or nonradioactive, benchtop experimentation) under the more realistic radioactive condition. As such, the operation will involve the reprocessing and refabrication of spent HTGR fuel rods obtained from the Fort St. Vrain reactor. The reference fuel is highly enriched uranium. No significant radiological impacts are expected from routine operation of the facility to any biota or ecosystem. Concentrations of one or more radionuclides in Whiteoak Lake will increase as a result of the combination of HETP wastes with other ORNL wastes. Nonradiological effects from construction activities and routine operation should be insignificant on land and water use and on terrestrial and aquatic ecosystems. No significant socioeconomic impacts should occur from either construction or operation of the facility. Some conservative accident scenarios depict significant releases of radioactivity. Effects should be localized and would not be severe for all but the most unlikely of such incidents. No significant long-term commitment of resources is expected to be required for the project. Nor are any large quantities of scarce or critical resources likely to be irreversibly or irretrievably committed to the project. Principal alternatives considered were: relocation of the project site, postponement of the project schedule, project cancellation, and chemical process variations

  3. Land Tenure Adjustment Project. Preliminary Draft Environmental Impact Statement/Report

    Science.gov (United States)

    1987-04-16

    southern California render the probability of major agricultural produrtion in the impact area unlikely. Extractive industry in the impact area is neither...American Indians, Vol. 8: California, ed. Robert F. Heizer . Smithsonian Institution, Washington, D.C. Bean, Lowell John, and Sylvia Brakke Vane. 1979...American Indians, Vol. 8: California, ed. Robert F. Heizer , pp. 567-569. Smithsonian Institution, Washington, D.C. LTA REVISION 2 B-2 California Air

  4. Site Study Plan for soils, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Soils Site Study Plan describes a field program consisting of a soil characterization survey, impact monitoring of soils, predisturbance soil salinity survey, and a reclamation suitability study. This information will be used to plan for soil stripping, stockpiling, and replacement; reclamation of soils; determining predisturbance chemical and physical characteristics of the soils; including salinity levels; and monitoring for changes in chemical and physical characteristics of the soil. The SSP describes for each study the need for the study, the study design, data management and use, schedule of proposed activities, and the quality assurance program. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document. 75 refs., 10 figs., 5 tabs

  5. Environmental Impact Statement. Preliminary Draft. Realignment of Cannon Air Force Base, Curry County, New Mexico

    Science.gov (United States)

    1989-12-15

    Park are in the center of the lower third of i the MOA. Also under the MOA is the Capulin Volcano National Monument in the upper northwest and Clayton...Park, Capulin Volcano National Monument, a ranch near Quay and the village of House, New Mexico, near the Melrose Range. The Bell Ranch Complex is...is a 1 nm avoidance area around Mosquero and 2 nm area around Capulin Volcano National Monument, Bell Ranch, Quay, Kenton State Park, 2 specified

  6. Site Study Plan for land use, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Land Use Site Study Plan describes a field program consisting of characterization of the site; seismic survey rights-of-way and transportation and utility corridors, the vicinity, the region, future land use, and monitoring land-use change. Aerial photography will be used to characterize the site, seismic rows and transportation and utility corridors, and the vicinity. The resulting land-use maps and overlays will then be verified in the field. Interviews with farm managers and local experts will provide additional information. A Geographic Information System (GIS) and satellite imagery will be used to characterize the region, monitor land-use change, and provide information to assist with the future land use study. The site study plan describes the study design and rationale, the filed data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the personnel requirements and management of the study, and the study's quality assurance program. The directives and requirements that drive these studies are derived from the Salt Repository Project Requirements Document. 51 refs; 6 figs; 3 tabs

  7. Site Study Plan for Acoustics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Acoustics site study plan describes a field program which characterizes existing sound levels, determines the area's sound propagation characteristics, and monitors the project-related sound emissions. The plan describes for each study: the need for the study, study design, data management and use, schedule, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Requirements Document. 37 refs., 9 figs., 3 tabs

  8. Site Study Plan for Aesthetics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Aesthetic Site Study Plan describes a field program consisting of identification of the visually affected area; determination of scenic quality, visual sensitivity, and visual management classes of the site and vicinity; and analysis of the level of visual contrast that would be created by the project. Field ratings of scenic quality, visual sensitivity, and visual contrast will be supplemented by a public perception survey designed to incorporate the views of the public. This plan describes the need for the study, the study design, data management and use, schedule for proposed activities, and quality assurance program. This study will provide data needed to satisfy requirements contained in, or derived from, SRPO Requirement Document (SRP-RD). 35 refs., 6 figs., 2 tabs

  9. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  10. Site Study Plan for salt, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Salt Site Study Plan (SSP) describes a program for characterizing the existing salt environment in the site vicinity. A step-by-step approach is described which proceeds from published data and planned theoretical studies, to planned laboratory studies, and finally to planned field studies, to provide the necessary data to meet program requirements contained in the Salt Repository Project - Requirements Document (SRP-RD). The plan also draws on the results of other SSP's for certain data; for example, soil salinity data are to be provided under the Soils SSP. The salt studies consist of evaluation of control and mitigation measures, salt monitoring studies, emission factors development, air models development and validation, and risk assessment. For each study, its design and design rationale; analysis, management, and use of data; schedule of activities; organization of personnel and sample management; and quality assurance requirements are described. 90 refs., 9 figs., 7 tabs

  11. Site study plan for ecology, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary Draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Ecology Site Study Plan describes a field program consisting of studies which include surveys for endangered, threatened, and candidate species; vegetation characterization, including mapping and cover typing, plant succession, wetlands description, and preexisting stresses; and wildlife community characterization, including availability and quality of habitats and descriptions of mammal, bird, reptile, amphibian, and invertebrate populations. The plan for each study describes the need for the study, study design, data management and use, schedule and personnel requirements, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document (SRP-RD). 83 refs., 3 tabs

  12. 75 FR 47622 - Draft Environmental Impact Statement for the Cloverdale Rancheria of Pomo Indians' Proposed 70...

    Science.gov (United States)

    2010-08-06

    ... Rancheria of Pomo Indians (Tribe), National Indian Gaming Commission (NIGC), Environmental Protection Agency...; visual resources; environmental justice; growth inducing effects, indirect effects; cumulative effects...

  13. A Qualitative Study of Factors Influencing Racial Diversity in Environmental Education: Preliminary Results

    Science.gov (United States)

    Kathy James; Leo H. McAvoy

    1992-01-01

    This study presents preliminary result interviews with people of color working in environmental education and interpretation throughout the United States. The three primary questions asked were these? (1) What path led each individual to a career in environmental education; (2) How does each individual define environmentalism? and (3) What are the primary issues this...

  14. 78 FR 39315 - Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Workshops...

    Science.gov (United States)

    2013-07-01

    ...The Bureau of Reclamation has made available for public review and comment the Draft Environmental Impact Statement (DEIS) for the Shasta Lake Water Resources Investigation (SLWRI). The purpose of the proposed action is to improve operational flexibility of the Sacramento-San Joaquin Delta watershed system by modifying the existing Shasta Dam and Reservoir to meet specified objectives. Primary objectives are to increase the survival of anadromous fish populations in the upper Sacramento River and increase water supply and water supply reliability. Secondary planning objectives are to: conserve, restore, and enhance ecosystem resources in the primary study area; reduce flood damage along the Sacramento River; develop additional hydropower generation capabilities; maintain and increase recreation opportunities; and maintain or improve water quality conditions in the Sacramento River downstream from Shasta Dam and in the Sacramento-San Joaquin Delta.

  15. Review of the draft supplement to the WIPP environmental impact statement DOE/EIS-0026-S-2

    International Nuclear Information System (INIS)

    Neill, R.H.; Channell, J.K.; Spiegler, P.; Chaturvedi, L.

    1997-04-01

    New Mexico Environmental Evaluation Group's (EEG) review of the WIPP Disposal Phase Draft Supplemental Environmental Impact Statement (SEIS-II) concentrated on the radiological aspects of the Proposed Action, including transportation. The alternatives were reviewed in less detail. Some calculations were checked, mostly for the Proposed Action. Because of time constraints, there was little review of Hazardous Chemicals, Economics, or other Environmental Assessments. SEIS-II was written as a pre-decision document with the Alternatives all plausible and eligible to be selected. Also, the inventory of TRU waste for disposal went well beyond that portion of TRU waste that has been historically considered to be the WIPP inventory. This broadened scope is probably appropriate for an EIS but it is confusing to the reviewer who is aware of the statutory limits of wastes that are allowed to come to WIPP at the present time. EEG has attempted to keep the broadened scope of SEIS-II in mind during their review. The more important issues discussed within are: alternatives; related documents; transportation; questionable assumptions; use of the 75th percentile values; family farm scenario and inhalation doses; modification of BRAGFLO volumes; emplacement of remotely handled TRU wastes; conversion error; and remotely handled TRU casks

  16. 76 FR 41510 - Draft Environmental Impact Statement and Habitat Conservation Plan for Commercial Wind Energy...

    Science.gov (United States)

    2011-07-14

    ... quality, water quality, water resources, economics, and other environmental/historical resources that may... the U.S., Archeology, Architectural History, Sites of Religious and Cultural Significance to Tribes, Noise and Vibration, Visual Resources and Aesthetics, Economics and Socioeconomics, Environmental...

  17. 78 FR 64493 - Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft...

    Science.gov (United States)

    2013-10-29

    ... Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft Preliminary Draft... Hydropower, Inc. e. Name of Project: Sweetheart Lake Hydroelectric Project. f. Location: At the confluence of..., Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, email: duff...

  18. 75 FR 78729 - Notice of Availability of a Draft Environmental Impact Statement for the Sunset Area Community...

    Science.gov (United States)

    2010-12-16

    ... agency has addressed the following areas in the Draft EIS: Aesthetics; air quality, including greenhouse... education, safety, health, and social services; socioeconomics, including demographic, employment, and...

  19. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 2. Appendices

    International Nuclear Information System (INIS)

    1998-07-01

    The appendices contains additional relevant information on: Environment Australia EIS Guidelines, composition of the Study Team, Consultation Activities and Resuits, Relevant Legislation and Regulatory Requirements, Exampies of Multi-Purpose Research Reactors, Impacts of Radioactive Emissions and Wastes Generated at Lucas Heights Science and Technology Centre, Technical Analysis of the Reference Accident, Flora and Fauna Species Lists, Summary of Environmental Commitments and an Outline of the Construction Environmental Management Plan Construction Environmental Management Plan

  20. C2 Link Security for UAS: Technical Literature Study and Preliminary Functional Requirements. Version 0.9 (Working Draft)

    Science.gov (United States)

    2005-01-01

    This document provides a study of the technical literature related to Command and Control (C2) link security for Unmanned Aircraft Systems (UAS) for operation in the National Airspace System (NAS). Included is a preliminary set of functional requirements for C2 link security.

  1. 75 FR 52549 - Environmental Impact Statement; Alabama Beach Mouse Draft General Conservation Plan; Fort Morgan...

    Science.gov (United States)

    2010-08-26

    ... significantly impairing essential behavioral patterns, including breeding, feeding, and sheltering [50 CFR 17.3..., economics, and other environmental resource issues that could occur directly or indirectly with...

  2. 76 FR 52656 - Rhode Island Department of Environmental Management; Notice of Preliminary Permit Application...

    Science.gov (United States)

    2011-08-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14211-000] Rhode Island Department of Environmental Management; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 10, 2011, the Rhode Island Department of Environmental Management...

  3. Environmental Indicators. A Preliminary Set = Indicateurs d'environnement. Une etude pilote.

    Science.gov (United States)

    Organisation for Economic Cooperation and Development, Paris (France).

    This document provides a preliminary set of environmental indicators by which to measure environmental performance. The indicators are patterned on the outline of the Organisation for Economic Cooperation and Development (OECD) "Report on the State of the Environment," a companion volume published in the same year. This volume is…

  4. 78 FR 54669 - Draft Environmental Impact Statement for the Proposed RES Americas Moapa Solar Energy Center...

    Science.gov (United States)

    2013-09-05

    ... Environmental Impact Statement for the Proposed RES Americas Moapa Solar Energy Center, Clark County, Nevada... environmental impact statement (DEIS) for the proposed RES Americas Moapa Solar Energy Center on the Moapa River... Progress and on the following Web site: www.MoapaSolarEnergyCenterEIS.com . In order to be fully considered...

  5. 78 FR 75370 - Draft Supplemental Environmental Assessment and Finding of No Significant Impact for Flood...

    Science.gov (United States)

    2013-12-11

    ... Environmental Assessment and Finding of No Significant Impact for Flood Control Improvements to the Rio Grande... Supplemental Environmental Assessment (SEA) and Finding of No Significant Impact (FONSI). SUMMARY: Pursuant to... Significant Impact for Flood Control Improvements to the Rio Grande Canalization Project in Vado, New Mexico...

  6. Environmental regulatory compliance plan, Deaf County site, Texas: Draft revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    The DOE is committed to conduct its operation in an environmentally safe and sound manner and comply with the letter and spirit of applicable environmental statues and regulations. These objectives are codified in DOE order N 5400.2, ''Environmental Policy Statement.'' This document, the Deaf Smith County site (Texas) Environmental Regulatory Compliance Plam (ERCP), is one means of implementing that policy. The ERCP describes the environmental regulatory requirements applicable to the Deaf Smith County site (Texas), and presented the framework within which the Salt Repository Project Office (SRPO) will comply with the requirements. The plan also discusses how DOE will address State and local environmental requirements. To achieve this purpose the ERCP will be developed in phases. This version of the ERCP is the first phase in the delopment of the ERCP. It represents the Salt Repository Project Office's understanding of environmental requirements for the site characterization phase of repository development. After consultation with the appropriate federal and state agencies and affected Indian tribes, the ERCP will be updated to reflect the results of consultation with these agencies and affected Indian tribes. 6 refs., 38 figs

  7. Replacement Nuclear Research Reactor: Draft Environmental Impact Statement. Vol. 2. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The appendices contains additional relevant information on: Environment Australia EIS Guidelines, composition of the Study Team, Consultation Activities and Resuits, Relevant Legislation and Regulatory Requirements, Exampies of Multi-Purpose Research Reactors, Impacts of Radioactive Emissions and Wastes Generated at Lucas Heights Science and Technology Centre, Technical Analysis of the Reference Accident, Flora and Fauna Species Lists, Summary of Environmental Commitments and an Outline of the Construction Environmental Management Plan Construction Environmental Management Plan figs., ills., refs. Prepared for Australian Nuclear Science and Technology Organisation (ANSTO)

  8. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 1. Draft environmental statement

    International Nuclear Information System (INIS)

    1976-06-01

    Subject to authorizing legislation and funding, ERDA will proceed with steps for additional uranium enrichment capacity at the Portsmouth Gaseous Diffusion Plant near Piketon, Ohio. This environmental statement was prepared by ERDA to cover this action. The statement was prepared in accordance with the National Environmental Policy Act of 1969, and ERDA's implementing regulations, 10 CFR Chapter III, Part 711. The statement describes the reasonably foreseeable environmental, social, economic and technological costs and benefits of the construction and operation of the expanded enrichment plant and its reasonably available alternatives and their anticipated effects

  9. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 1. Draft environmental statement

    Energy Technology Data Exchange (ETDEWEB)

    1976-06-01

    Subject to authorizing legislation and funding, ERDA will proceed with steps for additional uranium enrichment capacity at the Portsmouth Gaseous Diffusion Plant near Piketon, Ohio. This environmental statement was prepared by ERDA to cover this action. The statement was prepared in accordance with the National Environmental Policy Act of 1969, and ERDA's implementing regulations, 10 CFR Chapter III, Part 711. The statement describes the reasonably foreseeable environmental, social, economic and technological costs and benefits of the construction and operation of the expanded enrichment plant and its reasonably available alternatives and their anticipated effects.

  10. Decommissioning of the Shippingport Atomic Power Station. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1981-10-01

    The US DOE proposes to decommission the Shippingport Atomic Power Station. This environmental impact statement analyzes possible decommissioning alternatives, evaluates potential environmental impacts associated with each alternative, and presents cost estimates for each alternative. The Department's preferred decommissioning alternative is immediate dismantlement. Other alternatives include no action, safe storage followed by deferred dismantlement, and entombment. The environmental impacts that are evaluated include those associated with occupational radiation dose, public radiation dose, handling and transporting of radioactive wastes, resource commitments, and socio-economic effects

  11. 76 FR 45609 - Notice of Availability of the Draft Environmental Impact Statement for the Gateway West 230/500...

    Science.gov (United States)

    2011-07-29

    ... respondent will be available for public inspection at the locations listed below during their business hours... Idaho, Nevada, and Wyoming and Prospective Draft Land Use Plan Amendments AGENCY: Bureau of Land... Gateway West Transmission Line Project DEIS and prospective draft Land Use Plan (LUP) Amendments. The DEIS...

  12. Environmental Survey preliminary report, Naval Petroleum Reserves in California (NPRC), Tupman, California

    Energy Technology Data Exchange (ETDEWEB)

    1989-02-01

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Naval Petroleum Reserves 1 (NPR-1) and 2 (NPR-2) in California (NPRC), conducted May 9--20, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NPRC. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involved the review of existing site environmental data, observations of the operations carried on at NPRC, and interviews with site personnel. 120 refs., 28 figs., 40 tabs.

  13. Draft Environmental Impact Statement for the tank waste remediation system. Volume 4

    International Nuclear Information System (INIS)

    1996-04-01

    This appendix describes the current safety concerns associated with the tank waste and analyzes the potential accidents and associated potential health effects that could occur under the alternatives included in this Tank Waste Remediation System (TWRS) Environmental Impact Statement (EIS)

  14. 78 FR 43964 - Intent To Prepare a Supplemental Draft Environmental Impact Statement for the Southwest Light...

    Science.gov (United States)

    2013-07-22

    ... economy and efficiency in government, it is FTA policy to limit insofar as possible distribution of... distribute only electronic copies of the NEPA document. A complete printed set of the environmental document...

  15. 77 FR 28421 - Supplemental Draft Environmental Impact Statement for the Central Corridor Light Rail Transit...

    Science.gov (United States)

    2012-05-14

    ..., and disposition of information. Consistent with this goal and with principles of economy and... distribute only electronic copies of the NEPA document. A complete printed set of the environmental document...

  16. 75 FR 68333 - Notice of Availability of a Draft Programmatic Environmental Impact Statement (PEIS) for the...

    Science.gov (United States)

    2010-11-05

    .... ADDRESSES: Written comments may be sent to: Public Affairs Office, U.S. Army Environmental Command, Attention: IMPA-AE, 1835 Army Boulevard, Basement (Building 2000), Fort Sam Houston, TX 78234-2686. FOR...

  17. 75 FR 54694 - Notice of Availability of a Supplemental Draft Environmental Impact Statement for the...

    Science.gov (United States)

    2010-09-08

    ... Counsel of Environmental Quality (CEQ) regulations implementing NEPA (40 CFR parts 1500 et seq.) and FRA's... and additions, which include a new Victorville passenger station option at Dale Evans Parkway, a rail...

  18. Occidental Geothermal, Inc. , Oxy Geothermal Power Plant No. 1: draft environmental impact report

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-01

    The following aspects of the proposed geothermal power plant are discussed: the project description; the environment in the vicinity of project as it exists before the project begins, from both a local and regional perspective; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the growth inducing impacts. (MHR)

  19. Environmental impact directory system: preliminary implementation for geothermal energy

    Energy Technology Data Exchange (ETDEWEB)

    Hess, F.D.; Hall, R.T.; Fullenwider, E.D.

    1976-07-01

    An Environmental Impact Directory System (EIDS) was proposed as a method for a computerized search of the widely distributed data files and models pertaining to energy-related environmental effects. To define the scope and content of the system, an example was prepared for the case of geothermal energy. The resulting sub-directory is known as GEIDs (Geothermal Environmental Impact Directory System). In preparing or reviewing an Environmental Impact Statement (EIS), the user may employ GEIDS as an extensive checklist to make sure he has taken into account all predictable impacts at any level of severity.

  20. 78 FR 73555 - Deepwater Horizon Oil Spill; Draft Programmatic and Phase III Early Restoration Plan and Draft...

    Science.gov (United States)

    2013-12-06

    ... Environmental Impact Statement (Draft Phase III ERP/PEIS). The Draft Phase III ERP/PEIS considers programmatic... programmatic restoration alternatives. The Draft Phase III ERP/PEIS evaluates these restoration alternatives... the Framework Agreement. The Draft Phase III ERP/PEIS also evaluates the environmental consequences of...

  1. Draft environmental statement on the transportation of radioactive material by air and other modes. DOCKET No. PR-71,73 (40 FR 23768)

    International Nuclear Information System (INIS)

    1976-03-01

    This draft environmental statement was prepared in connection with the NRC re-evaluation of its present regulations governing air transportation of radioactive materials, to provide sufficient analysis to determine the effectiveness of the present rules and of possible alternatives to those rules. The following topics are discussed: regulations governing radioactive materials transport; radiological effects; transport impacts under normal conditions; effect of transport under accident conditions; alternatives; and security and safeguards

  2. Technical procedures for implementation of background environmental radioactivity site studies, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-09-01

    The purpose of this technical procedure is to describe the method for performing field maintenance on low-volume air samplers and the associated topics of personnel and organization, procedure preparation, documentation, and quality assurance. The scope of this procedure includes the maintenance of low-volume air samplers in the field and does not encompass maintenance performed by the manufacturer

  3. Environmental Impact Analysis Process. Preliminary Draft Environmental Impact Statement. Construction and Operation of Space Launch Complex 7. Volume 2. Appendices.

    Science.gov (United States)

    1989-03-15

    Vicinity of Honda Ceek --, D-3 I I A-I A. I FEDERAL REGISTER NOTICE OF INTENT DTIC QUALITY IrNSPECTED 3 Aooession For 171S OR-A&I DTIC TAB [] Unanocounced 0...Thorn I A-60 LETTER 2 •"• I United States Department of the Interior FISH AND WILDLIFE SERVICELAGUNA NIGUEL FIELD OFFICE 24000 Avila Road Laguna ...region, including Honda Creek and Jalama Creek, have two beneficial use designa- tions (recreation and aquatic life) that must be protected. 2

  4. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan. Volume 4 of 4

    International Nuclear Information System (INIS)

    1996-08-01

    The US Department of Energy's (DOE) is preparing this ''Hanford Site Comprehensive Land Use Plan'' (Comprehensive Plan), Appendix M to address future land uses for the Hanford Site. The DOE has integrated this land-use planning initiative with the development of the HRA-EIS to facilitate and expedite land-use and remediation decision making, reduce time and cost of remediation, and optimize the usefulness of the planning process. The HRA-EIS is being developed to evaluate the potential environmental impacts associated with remediation, create a remedial baseline for the Environmental Restoration Program, and provide a framework for future uses at the Hanford Site. This Comprehensive Plan identifies current assets and resources related to land-use planning, and provides the analysis and recommendations for future land sues and accompanying restrictions at the Hanford Site over a 50-year period. This Comprehensive Plan relies on the analysis of environmental impacts in the HRA-EIS. The National Environmental Policy Act of 1969 (NEPA) Record of Decision (ROD) issued for the HRA-EIS will be the decision process for finalization and adoption of this Comprehensive Plan. The HRA-EIS and this Comprehensive Plan will provide a basis for remediation decisions to be identified and contained in site- and area-specific Comprehensive Environmental Response, Compensation and Liability Act of 1980 ROD

  5. The Wm. H. Zimmer Nuclear Power Station: Draft environmental statement (Docket No. 50-358)

    International Nuclear Information System (INIS)

    1976-10-01

    The proposed action is the issuance of an operating license to the Cincinnati Gas and Electric Company, the Columbus and Southern Ohio Electric Company, and the Dayton Power and Light Company for the startup and operation of the Wm. H. Zimmer Nuclear Power Station (Docket No. 50-358) (the station), located on the Ohio River in Clermont County, about 24 miles southeast of Cincinnati, Ohio. The information in this statement represents the second assessment of the environmental impact associated with the Zimmer Nuclear Power Station pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receipt of an application in 1970 to construct this plant, the staff carried out a review of impact that would occur during the plant's construction and operation. This evaluation was issued as a final environmental statement in September 1972. As the result of this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and a public hearing in Cincinnati, Ohio, the AEC (now NRC) issued a permit in October 1972 for the construction of Unit 1 of the Zimmer Nuclear Power Station. As of June 1976, the construction of the plant was 54% complete. With a proposed fuel-loading data of April 1978, the applicant has petitioned for license to operate Unit 1 and has submitted (September 1975) the required safety and environmental reports to substantiate this petition. 96 refs., 17 figs., 34 tabs

  6. A preliminary analysis of environmental dilemmas and environmental ethical reasoning among Hispanic and non-Hispanic forest visitors

    Science.gov (United States)

    Thomas C. Swearingen; Robert E. Pfister

    1995-01-01

    In a preliminary investigation of environmental reasoning, Hispanic and Anglo-American visitors were interviewed during the summer of 1991 in two National Forests near Los Angeles. A bilingual research technician approached parties visiting the sample sites and, after a brief introduction, requested that they participate in the study. No more than two persons from each...

  7. Uranium milling: Volume 1, Summary and text: Generic environmental impact statement: Draft

    International Nuclear Information System (INIS)

    1979-04-01

    This generic environmental impact statement on uranium milling has been prepared in accordance with a notice of intent published by the Nuclear Regulatory Commission (NRC). The purpose of the statement is to assess the potential environmental impacts of uranium milling operations, in a programmatic context, including the management of uranium mill tailings, and to provide an opportunity for public participation in decisions on any proposed changes in NRC regulations based on this assessment. The principal objectives of the statement are to assess the nature and extent of the environmental impacts of uranium milling in the United states from local, regional, and national perspectives on both short- and long-term bases, to determine what regulatory actions are needed; to provide information on which to determine what regulatory requirements for management and disposal of mill tailings and mill decommissioning should be; and to support any rule makings that may be determined to be necessary. 39 figs., 130 tabs

  8. A contractor report to the Department of Energy on environmental management baseline programs and integration opportunities (discussion draft)

    International Nuclear Information System (INIS)

    1997-05-01

    In July 1996, the US Department of Energy (DOE) Assistant Secretary for Environmental Management (EM) chartered a government contractor led effort to develop a suite of technically defensible, integrated alternatives which meet the EM mission. The contractor team was challenged to ''think outside-the-box'' for solutions that cross traditional site boundaries and enable the programs to get the job done at an earlier date and at a lower cost. This report documents baseline programs current plans for material disposition and presents the opportunities for additional acceleration of cleanup and cost savings. A graphical depiction of the disposition of EM-owned waste and material from current state to final disposition is shown as disposition maps in Attachments 1, 3, 5, 7, 9, and 11. These disposition maps detail the material disposition at eleven major DOE sites as planned in the current discussion draft plan, Accelerating Cleanup: Focus on 2006. Maps reflecting material disposition at additional sites will be added in the future. Opportunities to further accelerate the cleanup of DOE-EM sites and reduce the overall cost of cleanup are depicted in the alternative disposition maps shown in Attachments 2, 4, 6, 8, 10, and 12. These integration opportunities bring nation-wide resources to bear on common problems facing the DOE sites

  9. Review and assessments of potential environmental, health and safety impacts of MHD technology. Final draft

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    The purpose of this document is to develop an environmental, health and safety (EH and S) assessment and begin a site - specific assessment of these and socio - economic impacts for the magnetohydrodynamics program of the United States Department of Energy. This assessment includes detailed scientific and technical information on the specific EH and S issues mentioned in the MHD Environmental Development Plan. A review of current literature on impact-related subjects is also included. This document addresses the coal-fired, open-cycle MHD technology and reviews and assesses potential EH and S impacts resulting from operation of commercially-installed technology.

  10. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 2. Draft environmental statement

    Energy Technology Data Exchange (ETDEWEB)

    Pennington, W. H.

    1976-06-01

    The need for additional uranium enrichment facilities and the environmental impacts of the add-on gaseous diffusion plant proposed for the Portsmouth Gaseous Diffusion Plant are discussed. A detailed description of the proposed facilities is included and unavoidable adverse environmental effects, possible alternatives, and anticipated benefits from the proposed facilities are considered. The flora and fauna of the area are tabulated and possible effects of air and water pollution on aquatic and terrestrial ecosystems are postulated. The extent of anticipated noise impact on the vicinity and the anticipated extent of civic envolvement are discussed. (CH)

  11. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 2. Draft environmental statement

    International Nuclear Information System (INIS)

    1976-06-01

    The need for additional uranium enrichment facilities and the environmental impacts of the add-on gaseous diffusion plant proposed for the Portsmouth Gaseous Diffusion Plant are discussed. A detailed description of the proposed facilities is included and unavoidable adverse environmental effects, possible alternatives, and anticipated benefits from the proposed facilities are considered. The flora and fauna of the area are tabulated and possible effects of air and water pollution on aquatic and terrestrial ecosystems are postulated. The extent of anticipated noise impact on the vicinity and the anticipated extent of civic envolvement are discussed

  12. Environmental organisations and the EC. Action options of environmental organisations for improving environmental consciousness and environmental policy in the European Community. Draft summary

    International Nuclear Information System (INIS)

    Hey, C.; Brendle, U.

    1992-01-01

    A European-wide awakening of environmental organizations began in the middle of the eighties, about the same time as the political push for EC integration. The European work of the environmental organizations is at a turning point almost everywhere. Most organizations made important structural decisions in the last few years, and the speed of the change has been fast. The landscape of environment organizations is becoming more complex and certainly more politically important on a European level. This push for internationalization will certainly entail an inter-cultural learning process, which could lead to a 'European' identity in the mid-term. The various national condition for environmental organizations in Germany, Spain, Holland, Great Britain, and on a European level are compared here. (orig./DG)

  13. 78 FR 60309 - Draft Environmental Impact Statement for the Restoration of Native Species in High Elevation...

    Science.gov (United States)

    2013-10-01

    ... must be postmarked or transmitted not later than 60 days from the date of publication in the Federal... environmental modifications such as nonnative fish, disease, and unprecedented climate change. The overall goal of the Restoration Plan/DEIS is to restore clusters of water bodies to a fishless state in strategic...

  14. 75 FR 69649 - Notice of Availability for the Draft Programmatic Environmental Assessment for the Development...

    Science.gov (United States)

    2010-11-15

    ... Environmental Assessment for the Development and Operation of Small-Scale Wind Energy Projects at United States Marine Corps Facilities Throughout the United States AGENCY: Department of the Navy, DoD. ACTION: Notice...-1508), and Marine Corps NEPA directives (Marine Corps Order P5090.2A), the Department of the Navy...

  15. 78 FR 40425 - Draft Environmental Assessment for the J. Phil Campbell, Senior, Natural Resource Conservation...

    Science.gov (United States)

    2013-07-05

    ... Environmental Sciences (CAES). This notice is announcing the opening of a 30-day public comment period. DATES... Proposed JPC-NRCC Land Transfer by any of the following methods: Email: [email protected] , Fax: 309... conduct a wide range of research, teaching, extension, and demonstration activities. Since August 2012 it...

  16. 78 FR 57845 - Notice of Public Meetings for the Draft Supplemental Environmental Impact Statement for the...

    Science.gov (United States)

    2013-09-20

    ...) of the National Environmental Policy Act of 1969 and regulations implemented by the Council on... Harbor, Washington 98277. 2. Thursday, October 17, 2013 at Holiday Inn Hotel & Suites, 620 Wells Road... Section 7 of the Endangered Species Act, the DoN is consulting with U.S. Fish and Wildlife Service, as...

  17. 76 FR 75557 - Draft Environmental Impact Statement for General Management Plan/Wilderness Study, Hawaii...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park, Hawaii AGENCY: National Park Service, Interior. ACTION: Notice of intent. SUMMARY: The National Park... updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...

  18. 75 FR 57005 - Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the...

    Science.gov (United States)

    2010-09-17

    ... Statement and Public Hearings for the Proposed Energia Sierra Juarez U.S. Transmission Project (ESJ-U.S... Energia Sierra Juarez U.S. Transmission Line Project'' (DOE/EIS-0414) for public comment. DOE also... environmental impacts of DOE's proposed Federal action of issuing a Presidential permit to Energia Sierra Juarez...

  19. 76 FR 30754 - Notice of Availability of the Draft Environmental Impact Statement: Riverside and Orange Counties...

    Science.gov (United States)

    2011-05-26

    ... Environmental Impact Statement: Riverside and Orange Counties, CA AGENCY: Federal Highway Administration (FHWA... Riverside and Orange Counties, California. DATES: The comment period for the State Route 91 Corridor... in Riverside and Orange Counties. The State Route 91 Corridor Improvement Project proposes to widen...

  20. 75 FR 55846 - Draft Re-Evaluation for Environmental Impact Statement: Sikorsky Memorial Airport, Stratford, CT

    Science.gov (United States)

    2010-09-14

    ..., Environmental Program Manager, Federal Aviation Administration New England, 12 New England Executive Park... Memorial Airport in Stratford, Connecticut. The document will assist the FAA in determining the suitability... following locations: FAA New England Region, 16 New England Executive Park, Burlington, MA, 781-238-7613...

  1. 76 FR 77234 - Availability of Draft Vieques Report: An Evaluation of Environmental, Biological, and Health Data...

    Science.gov (United States)

    2011-12-12

    ..., and locally grown foods. In addition, this report evaluates human biomonitoring and health outcome... ATSDR Public Health Assessment reviews available information about hazardous substances at a site and.... This analysis generally involves an evaluation of relevant environmental data, the potential for...

  2. 77 FR 14418 - Grand Ditch Breach Restoration Draft Environmental Impact Statement, Rocky Mountain National Park...

    Science.gov (United States)

    2012-03-09

    ... natural conditions and processes in park units (NPS Management Policies 2006, section 4.1.5). The... environmental impact statement: restore appropriate stream and groundwater processes, restore appropriate native.... Management activities would be conducted using hand tools to reduce impact on wilderness character. This...

  3. 76 FR 66998 - Detroit Edison Company; Notice of Availability of Draft Environmental Impact Statement for a...

    Science.gov (United States)

    2011-10-28

    ...-register to attend or present oral comments at the meetings by contacting Mr. Bruce Olson by telephone at 1... public meetings, the need should be brought to Mr. Bruce Olson's attention no later than December 8, 2011... FURTHER INFORMATION CONTACT: Mr. Bruce Olson, Project Manager, Environmental Projects Branch 2, Division...

  4. 76 FR 64893 - Notice of Availability of Draft Environmental Impact Statement, Rosemont Copper Project on the...

    Science.gov (United States)

    2011-10-19

    ... 90-day public comment period, which begins with the Environmental Protection Agency's publication of... contact information, will be accepted and considered; however, anonymous comments will not provide the... Elementary School, 23 Elgin Road, Elgin, AZ 85611 (tentative). 3. November 12, 2011, 1 p.m. to 5 p.m., Palo...

  5. Environmental implications of accelerated gasohol production: preliminary assessment

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    This report assesses the environmental impacts of increasing US production of fuel ethanol by 330 million gallons per year in the 1980 to 1981 time frame in order to substitute gasohol for 10% of the unleaded gasoline consumed in the United States. Alternate biomass feedstocks are examined and corn is selected as the most logical feedstock, based on its availability and cost. Three corn conversion processes that could be used to attain the desired 1980 to 1981 production are identified; fermentation plants that use a feedstock of starch and wastes from an adjacent corn refining plants are found to have environmental and economic advantages. No insurmountable environmental problems can be achieved using current technology; the capital and operating costs of this control are estimated. If ethanol production is increased substantially after 1981, the environmentally acceptable use or disposal of stillage, a liquid by-product of fermentation, could become a serious problem.

  6. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  7. Preliminary environmental impact statement for the Kvanefjeld uranium mine

    International Nuclear Information System (INIS)

    Pilegaard, K.

    1983-01-01

    The environmental impacts of the mining and milling of uranium from the Kvanefjeld are assessed in order - to provide a general description of the Narssaq area, with special reference to the ecological aspects, - to identify potential pollutants, and if possible to quantify these, - to identify critical pathways and populations, - to evaluate the technical design of the mine and mill in relation to the environment, - to evaluate alternatives, - to provide guidelines for preoperational environmental studies. (EG)

  8. Environmental Survey preliminary report, Morgantown Energy Technology Center, Morgantown, West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    1988-06-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Morgantown Energy Technology Center (METC) conducted November 30 through December 4, 1987. In addition, the preliminary findings of the Laramie Project Office (LPO) Survey, which was conducted as part of the METC Survey on January 25 through 29, 1988, are presented in Appendices E and F. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with METC. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at METC, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities at METC. The Sampling and Analysis Plan will be executed by the Oak Ridge National Laboratory (ORNL). When completed, the results will be incorporated into the METC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey METC. 60 refs., 28 figs., 43 tabs.

  9. Waste Isolation Pilot Plant disposal phase: Draft supplemental Environmental Impact Statement

    International Nuclear Information System (INIS)

    1996-11-01

    Purpose of this SEIS-II is to provide information on environmental impacts regarding DOE's proposed disposal operations at WIPP. To that end, SEIS-II was prepared to assess the potential impacts of continuing the phased development of WIPP as a geologic repository for the safe disposal of transuranic (TRU) waste. SEIS-II evaluates a Proposed Action, three Action Alternatives, and two No Action Alternatives. The Proposed Action describes the treatment and disposal of the Basic Inventory of TRU waste over a 35-year period. SEIS-II evaluates environmental impacts resulting from the various treatment options; transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a combination of truck and dedicated rail service; and the disposal of this waste in the repository. Evaluated impacts include those to the general environment and to human health. Additional issues associated with implementation of the alternatives are discussed

  10. Draft guidelines for an environmental impact assessment small scale hydroelectric plant redevelopment

    International Nuclear Information System (INIS)

    1992-01-01

    A pulp and paper company in St. George, New Brunswick, is proposing to redevelop an existing hydroelectric plant built around 1900. The redevelopment proposal consists of decommissioning the existing powerhouse, constructing a new powerhouse containing a 12-MW Kaplan turbine, excavating a tailrace channel, and installing a new penstock. Other design considerations include improvements to gates in the main dam for improved flood control and modifications to the trash racks to prevent potential fish mortality. The provincial environment ministry has determined that an environmental impact assessment of the potential impacts of the redevelopment was required. Guidelines to be used in the assessment process are presented, including definition of the study boundaries, prediction of environmental effects, description of methods of mitigating and compensating for anticipated impacts, a commitment to monitoring and public consultation, and submittal of terms of reference in response to final assessment guidelines. Requirements for conducting the assessment study and content of the report are also listed. 1 fig

  11. Estimation of 1945 to 1957 food consumption. Hanford Environmental Dose Reconstruction Project: Draft

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, D.M.; Bates, D.J.; Marsh, T.L.

    1993-03-01

    This report details the methods used and the results of the study on the estimated historic levels of food consumption by individuals in the Hanford Environmental Dose Reconstruction (HEDR) study area from 1945--1957. This period includes the time of highest releases from Hanford and is the period for which data are being collected in the Hanford Thyroid Disease Study. These estimates provide the food-consumption inputs for the HEDR database of individual diets. This database will be an input file in the Hanford Environmental Dose Reconstruction Integrated Code (HEDRIC) computer model that will be used to calculate the radiation dose. The report focuses on fresh milk, eggs, lettuce, and spinach. These foods were chosen because they have been found to be significant contributors to radiation dose based on the Technical Steering Panel dose decision level.

  12. Draft environmental statement related to the Union Carbide Corporation, Gas Hills Uranium Project (Natrona County, Wyoming)

    International Nuclear Information System (INIS)

    1979-01-01

    The proposed action is the renewal of Source Material License SUA-648 issued for the operation of the Gas Hills Uranium Project in Wyoming, near Moneta. The project is an acid leach, ion-exchange, and solvent-extraction uranium ore processing mill at an increased capacity of 500,000 tons per year and the construction of two heap leach facilities in Natrona and Fremont Counties for initial processing of low-grade ore. After analysis of environmental impacts and adverse effects, it is the proposed position of NRC that the license be renewed subject to conditions relating to stabilization of the tailings, reclamation, environmental monitoring, evaluation of any future activity not evaluated by NRC, archeological survey, analysis of unexpected harmful effects, and decommissioning

  13. Surplus plutonium disposition draft environmental impact statement. Volume 1, Part B

    International Nuclear Information System (INIS)

    1998-07-01

    On May 22, 1997, DOE published a Notice of Intent (NOI) in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS). DOE's disposition strategy allows for both the immobilization of surplus plutonium and its use as mixed oxide (MOX) fuel in existing domestic, commercial reactors. The disposition of surplus plutonium would also involve disposal of the immobilized plutonium and MOX fuel (as spent nuclear fuel) in a geologic repository. The Surplus Plutonium Disposition Environmental Impact Statement analyzes alternatives that would use the immobilization approach (for some of the surplus plutonium) and the MOX fuel approach (for some of the surplus plutonium); alternatives that would immobilize all of the surplus plutonium; and the No Action Alternative. The alternatives include three disposition facilities that would be designed so that they could collectively accomplish disposition of up to 50 metric tons (55 tons) of surplus plutonium over their operating lives: (1) the pit disassembly and conversion facility would disassemble pits (a weapons component) and convert the recovered plutonium, as well as plutonium metal from other sources, into plutonium dioxide suitable for disposition; (2) the immobilization facility would include a collocated capability for converting nonpit plutonium materials into plutonium dioxide suitable for immobilization and would be located at either Hanford or SRS. DOE has identified SRS as the preferred site for an immobilization facility; (3) the MOX fuel fabrication facility would fabricate plutonium dioxide into MOX fuel. This volume has chapters on environmental consequences; environmental regulations, permits, and consultations; a glossary; list of preparers; distribution list

  14. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1995-04-01

    The US Department of Energy (DOE) is responsible for performing remedial action to bring surface and ground water contaminant levels at 24 inactive uranium processing sites into compliance with the US Environmental Protection Agency (EPA) standards. DOE is accomplishing this through the Uranium Mill Tailings Remedial Action (UMTRA) Surface and Ground Water Projects. Remedial action will be conducted with the concurrence of the US Nuclear Regulatory Commission (NRC) and the full participation of affected states and Indian tribes. Uranium processing activities at most of 24 the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as uranium and nitrate. The purpose of the UMTRA Ground Water Project is to eliminate, or reduce to acceptable levels, the potential health and the environmental consequences of milling activities by meeting the EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance strategies. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently

  15. Technical procedures for ecology: Environmental field program, Deaf Smith County Site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the Land Use Site Study Plan including walkover surveys for threatened, endangered, or candidate species; vegetation classification and mapping; reclamation planning; wetland and floodplain determination and characterization of playas; wildlife habitat mapping methods; mammal sampling; bird survey methods; reptile and amphibian survey methods; preexisting environmental; stress and disturbance studies methods; voucher specimens for plants; and voucher specimens to wildlife. 9 refs., 5 figs., 1 tab

  16. Defense-Waste-Processing Faclity, Savannah River Plant, Aiken, SC: Draft environmental impact statement

    International Nuclear Information System (INIS)

    1981-09-01

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into both the selection of an appropriate strategy for the permanent disposal of the high-level radioactive waste (HLW) currently stored at the Savannah River Plant (SRP) and the subsequent decision to construct and operate a Defense Waste Processing Facility (DWPF) at the SRP site. The SRP is a major US Department of Energy (DOE) installation for the production of nuclear materials for national defense. Approximately 83 x 10 3 m 3 (22 million gal) of HLW currently are stored in tanks at the SRP site. The proposed DWPF would process the liquid HLW generated by SRP operations into a stable form for ultimate disposal. This EIS assesses the effects of the proposed immobilization project on land use, air quality, water quality, ecological systems, health risk, cultural resources, endangered species, wetlands protection, resource depletion, and regional social and economic systems. The radiological and nonradiological risks of transporting the immobilized wastes are assessed. The environmental impacts of disposal alternatives have recently been evaluated in a previous EIS and are therefore only summarized in this EIS

  17. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of the UMTRA Ground Water Project is to protect human health and the environment by meeting the proposed EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own unique set of potential impacts, could be used to implement all the alternatives except the no action alternative. Implementing a PEIS alternative means applying a ground water compliance strategy or strategies at a specific site. It is the use of a strategy or a combination of strategies that would result in site-specific impacts

  18. Environmental Resources of Selected Areas of Hawaii: Climate, Ambient Air Quality, and Noise (DRAFT)

    Energy Technology Data Exchange (ETDEWEB)

    Lombardi, D.A.; Blasing, T.J.; Easterly, C.E.; Hamilton, C.B.

    1994-06-01

    This report has been prepared to make available and archive background scientific data and related information on climate, ambient air quality, and ambient noise levels collected during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of hawaii in its April 1989 proposal to Congress. The US Department of Energy (DOE) published a notice in the Federal Register on May 17, 1994 withdrawing its Notice of Intent of February 14, 1992, to prepare the HGP-EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. The report presents a general description of the climate and air quality for the islands of Hawaii (henceforth referred to as Hawaii), Maui, and Oahu. It also presents a literature review as baseline information on the health effects of hydrogen sulfide. the scientific background data and related information is being made available for use by others in conducting future scientific research in these areas. This report describes the environmental resources present in the areas studied (i.e., the affected environment) and does not represent an assessment of environmental impacts.

  19. 76 FR 70979 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Point Thomson...

    Science.gov (United States)

    2011-11-16

    ... development by the Exxon Mobil Corporation and PTE Pipeline LLC (Applicant). The Draft EIS evaluates project..., warehouses, and shops; electric power generation and distribution facilities; fuel, water, and chemical...

  20. Shutdown of the River Water System at the Savannah River Site: Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-11-01

    This environmental impact statement (EIS) evaluates alternative approaches to and environmental impacts of shutting down the River Water System at the Savannah River Site (SRS). Five production reactors were operated at the site.to support these facilities, the River Water System was constructed to provide cooling water to pass through heat exchangers to absorb heat from the reactor core in each of the five reactor areas (C, K, L, P, and R). The DOE Savannah River Strategic Plan directs the SRS to find ways to reduce operating costs and to determine what site infrastructure it must maintain and what infrastructure is surplus. The River Water System has been identified as a potential surplus facility. Three alternatives to reduce the River Water System operating costs are evaluated in this EIS. In addition to the No-Action Alternative, which consists of continuing to operate the River Water System, this EIS examines one alternative (the Preferred Alternative) to shut down and maintain the River Water System in a standby condition until DOE determines that a standby condition is no longer necessary, and one alternative to shut down and deactivate the River Water System. The document provides background information and introduces the River Water System at the SRS; sets forth the purpose and need for DOE action; describes the alternatives DOE is considering; describes the environment at the SRS and in the surrounding area potentially affected by the alternatives addressed and provides a detailed assessment of the potential environmental impacts of the alternatives; and identifies regulatory requirements and evaluates their applicability to the alternatives considered

  1. Life-cycle costs for the Department of Energy waste management programmatic environmental impact statement (draft)

    International Nuclear Information System (INIS)

    Sherick, M.J.; Shropshire, D.E.; Hsu, K.M.

    1995-08-01

    The U.S. Department of Energy (DOE) Office of Environmental Management has produced a Programmatic Environmental Impact Statement (PEIS) in order to assess the potential consequences resulting from a cross section of possible waste management strategies for the DOE complex. The PEIS has been prepared in compliance with the National Environmental Policy Act, and includes evaluations of a variety of alternatives. The analysis performed for the PEIS included the development of life-cycle cost estimates for the different waste management alternatives being considered. These cost estimates were used in the PEIS to support the identification and evaluation of economic impacts. Information developed during the preparation of the life-cycle cost estimates was also used to support risk and socioeconomic analyses performed for each of the alternatives. This technical report provides an overview of the methodology used to develop the life-cycle cost estimates for the PEIS alternatives. The methodology that was applied made use of the Waste Management Facility Cost Information Reports, which provided a consistent approach and estimating basis for the PEIS cost evaluations. By maintaining consistency throughout the cost analyses, life-cycle costs of the various alternatives can be compared and evaluated on a relative basis. This technical report also includes the life-cycle cost estimate results for each of the PEIS alternatives evaluated. Summary graphs showing the results for each waste type are provided in the main document, and tables showing different breakdowns of the cost estimates are provided in the Appendices A-D. Appendix E contains PEIS cost information that was developed using an approach different than the standard methodology described in this report

  2. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan. Volume 3 of 4

    International Nuclear Information System (INIS)

    1996-08-01

    This volume of the Environmental Impact Statement contains ten appendices. These appendices contain the following: the ecological risk assessment methodology and calculations; the strategy for remediation of contaminated ground water; a description of the reference barrier and potential quarry sites that could be used to supply materials for barriers; the methodology for estimating socio-economic impacts; the methodology for evaluation of air quality impacts; an assessment of costs and physical impacts; the calculation of estimated industrial health and safety occupational losses; a floodplains and wetlands impact assessment; information about Hanford waste sites, and US EPA guidance on using land-use decisions in remediation

  3. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan: Summary

    International Nuclear Information System (INIS)

    1996-08-01

    This document analyzes the potential environmental impacts associated with establishing future land-use objectives for the US Department of Energy's Hanford Site. Impact analysis is performed by examining the consequences (primarily from remediation activities) of the actions determined necessary to achieve a desired future land-use objective. It should be noted that site-specific decisions regarding remediation technologies and remediation activities would not be made by this document, but rather by processes specified in the Comprehensive Environmental Response, Compensation and Liability Act of 1980 and the Resource Conservation and Recovery Act of 1976. To facilitate the establishment of future land-use objectives, the Hanford Site was divided into four geographic areas: (1) Columbia River; (2) reactors on the river; (3) central plateau; (4) all other areas. The future land-use alternatives considered in detail for each of the geographic areas are as follows: Columbia River--unrestricted and restricted; reactors on the river--unrestricted and restricted; central plateau--exclusive; all other areas--restricted. A No-Action Alternative also is included to provide a baseline against which the potential impacts of the proposed action can be assessed

  4. Revised draft Hanford remedial action environmental impact statement and comprehensive land-use plan: Executive summary

    International Nuclear Information System (INIS)

    1999-01-01

    This report evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years. With the exception of the required No-Action Alternative, each of the six alternatives presented represents a Tribal, Federal, state, or local agency's Preferred Alternative. Each alternative is presented separately. The DOE's Preferred Alternative anticipates multiple uses of the Hanford Site, including: consolidating waste management operations in the Central Plateau, allowing industrial development in the eastern and southern portions of the site, increasing recreational access to the Columbia River, and expanding the Saddle Mountain National Wildlife Refuge to include all of the Wahluke Slope (managed by the US Fish and Wildlife Service). The Hanford Site occupies 1,517 square kilometers (km 2 ) (586 square miles [mi 2 ]) in southeastern Washington. Today, the Hanford Site has diverse missions associated with environmental restoration, waste management, and science and technology. These missions have resulted in the growing need for a comprehensive, long-term approach to planning and development for the Site

  5. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan: Volume 1 of 4

    International Nuclear Information System (INIS)

    1996-08-01

    This document analyzes the potential environmental impacts associated with establishing future land-use objectives for the US Department of Energy's Hanford Site. Impact analysis is performed by examining the consequences (primarily from remediation activities) of the actions determined necessary to achieve a desired future land-use objective. It should be noted that site-specific decisions regarding remediation technologies and remediation activities would not be made by this document, but rather by processes specified in the Comprehensive Environmental Response, Compensation and Liability Act of 1980 and the Resource Conservation and Recovery Act of 1976. To facilitate the establishment of future land-use objectives, the Hanford Site was divided into four geographic areas: (1) Columbia River; (2) reactors on the river; (3) central plateau; (4) all other areas. The future land-use alternatives considered in detail for each of the geographic areas are as follows: Columbia River--unrestricted and restricted; reactors on the river--unrestricted and restricted; central plateau--exclusive; all other areas--restricted. A No-Action Alternative also is included to provide a baseline against which the potential impacts of the proposed action can be assessed

  6. Safety Research Experiment Facilities, Idaho National Engineering Laboratory, Idaho. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    This environmental statement was prepared in accordance with the National Environmental Policy Act of 1969 (NEPA) in support of the Energy Research and Development Administration's (ERDA) proposal for legislative authorization and appropriations for the Safety Research Experiment Facilities (SAREF) Project. The purpose of the proposed project is to modify some existing facilities and provide a new test facility at the Idaho National Engineering Laboratory (INEL) for conducting fast breeder reactor (FBR) safety experiments. The SAREF Project proposal has been developed after an extensive study which identified the FBR safety research needs requiring in-reactor experiments and which evaluated the capability of various existing and new facilities to meet these needs. The proposed facilities provide for the in-reactor testing of large bundles of prototypical FBR fuel elements under a wide variety of conditions, ranging from those abnormal operating conditions which might be expected to occur during the life of an FBR power plant to the extremely low probability, hypothetical accidents used in the evalution of some design options and in the assessment of the long-term potential risk associated with wide-scale deployment of the FBR

  7. Revised draft Hanford remedial action environmental impact statement and comprehensive land-use plan

    International Nuclear Information System (INIS)

    1999-01-01

    This report evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years. With the exception of the required No-Action Alternative, each of the six alternatives presented represents a Tribal, Federal, state, or local agency's Preferred Alternative. Each alternative is presented separately. The DOE's Preferred Alternative anticipates multiple uses of the Hanford Site, including: consolidating waste management operations in the Central Plateau, allowing industrial development in the eastern and southern portions of the site, increasing recreational access to the Columbia River, and expanding the Saddle Mountain National Wildlife Refuge to include all of the Wahluke Slope (managed by the US Fish and Wildlife Service). The Hanford Site occupies 1,517 square kilometers (km 2 ) (586 square miles [mi 2 ]) in southeastern Washington. Today, the Hanford Site has diverse missions associated with environmental restoration, waste management, and science and technology. These missions have resulted in the growing need for a comprehensive, long-term approach to planning and development for the Site

  8. Expansion of the Strategic Petroleum Reserve, Alabama, Louisiana, Mississippi, and Texas: Draft environmental impact statement

    International Nuclear Information System (INIS)

    1992-10-01

    The proposed action entails the development of a plan for 250 million barrels of new crude oil storage capacity in two Gulf Coast salt domes to expand the Strategic Petroleum Reserve pursuant to Congressional directive (PL 101--383 and PL 101--512). Storage capacity would be developed by solution-mining the salt which would require about two billion barrels of surface water and would generate about two billion barrels of salt brine. The brine would be disposed of primarily by ocean discharge and alternatively by deep underground injection. Crude oil fill and distribution systems would require new pipelines and terminal facilities. This EIS assesses the impacts of construction and operation for the range of alternatives being considered and focuses on oil and brine spill risk and impacts of brine disposal, water and land use, groundwater contamination, hydrocarbon emissions, and involvement with wetlands and floodplains. This volume focuses on the environmental risks and public occupational health and safety, environmental impacts, regulatory requirements and mitigation methods, the relationship between local short-term use and long-term productivity, and the commitment of resources

  9. Planning for a program design for energy environmental analysis. Final report, draft

    Energy Technology Data Exchange (ETDEWEB)

    Denton, J; Saaty, T; Blair, P; Ma, F; Buneman, P

    1976-04-01

    The objective of the work reported here is to assist BER/ERDA in program planning with respect to a regional assessment study program for energy environmental analysis. The focus of the work was to examine the use of operational gaming fof regional assessment studies. Specific concerns were gaming applications (1) in regional assessment or management and direction of regional assessments; (2) for achieving a higher level of public understanding of environmental, health, and safety problems of energy; (3) with respect to the supply of adequately trained manpower for energy; (4) with respect to computational requirements; and (5) with respect to current state-of-the-art in computer simulation. In order to investigate these concerns and examine the feasibility of using operational gaming in a regional assessment study program, a Regional Energy Environment Game (REEG) was designed and implemented on an IBM 370/168 digital computer employing APL (A Programming Language). The applicability of interactive operational gaming has been demonstrated by the REEG as applied to a region consisting of Delaware, Maryland, New Jersey, Pennsylvania, and the District of Columbia.

  10. Draft site-wide environmental impact statement for Sandia National Laboratories/New Mexico. Summary

    International Nuclear Information System (INIS)

    1999-04-01

    The DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. In the No Action Alternative, the DOE would continue the historical mission support activities SNL/NM has conducted at planned operational levels. In the Expanded Operations Alternative, the DOE would operate SNL/NM at the highest reasonable levels of activity currently foreseeable. Under the Reduced Operations Alternative, the DOE would operate SNL/NM at the minimum levels of activity necessary to maintain the capabilities to support the DOE mission in the near term. Under all of the alternatives, the affected environment is primarily within 50 miles (80 kilometers) of SNL/NM. Analyses indicate little difference in the environmental impacts among alternatives

  11. Programmatic environmental impact statement related to decontamination and disposal of radioactive wastes resulting from March 28, 1979 accident, Three Mile Island Nuclear Station, Unit 2 (Docket No. 50-320): Draft

    International Nuclear Information System (INIS)

    1986-12-01

    In accordance with the National Environmental Policy Act and the Commission's implementing regulations and its April 27, 1981 Statement of Policy, the Programmatic Environmental Impact Statement related to decontamination and disposal of radioactive wastes resulting from March 28, 1979, accident Three Mile Island Nuclear Station, Unit 2 NUREG-0683 (PEIS) is being supplemented. This draft supplement updates the environmental evaluation of accident-generated water disposal alternatives published in the PEIS, utilizing more complete and current information. Also, the draft supplement includes a specific environmental evaluation of the licensee's recently submitted proposal for water disposition

  12. Surplus plutonium disposition draft environmental impact statement. Volume 1, Part A

    International Nuclear Information System (INIS)

    1998-07-01

    On May 22, 1997, DOE published a Notice of Intent (NOI) in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS). DOE's disposition strategy allows for both the immobilization of surplus plutonium and its use as mixed oxide (MOX) fuel in existing domestic, commercial reactors. The disposition of surplus plutonium would also involve disposal of the immobilized plutonium and MOX fuel (as spent nuclear fuel) in a geologic repository. The Surplus Plutonium Disposition Environmental Impact Statement analyzes alternatives that would use the immobilization approach (for some of the surplus plutonium) and the MOX fuel approach (for some of the surplus plutonium); alternatives that would immobilize all of the surplus plutonium; and the No Action Alternative. The alternatives include three disposition facilities that would be designed so that they could collectively accomplish disposition of up to 50 metric tons (55 tons) of surplus plutonium over their operating lives: (1) the pit disassembly and conversion facility would disassemble pits (a weapons component) and convert the recovered plutonium, as well as plutonium metal from other sources, into plutonium dioxide suitable for disposition; (2) the immobilization facility would include a collocated capability for converting nonpit plutonium materials into plutonium dioxide suitable for immobilization and would be located at either Hanford or SRS. DOE has identified SRS as the preferred site for an immobilization facility; (3) the MOX fuel fabrication facility would fabricate plutonium dioxide into MOX fuel. This volume includes background information; purpose of and need for the proposed action; alternatives for disposition of surplus weapons useable plutonium; and

  13. Preliminary environmental impact statement for the Kvanefjeld Uranium Mine

    International Nuclear Information System (INIS)

    Pilegaard, K.

    1990-09-01

    The sources of pollution from a proposed uranium mining and milling complex at Kvanefjeld in South Greenland have been evaluated. The environmental impact assessment was part of a pre-feasibility study. The main aims of this study have been to identify potential pollutants and critical pathways, to evaluate the environmental impact of technical alternatives, and to provide guide-lines for pre-operational environmental studies. The study has identified the open pit, waste dump and tailings impoundment as the most important sources of pollution. The mobility of non-radioactive elements was lower in the tailings than in the ore, whereas the reverse was true for the radioactive elements. The potential pollutants include: Be, F, V, Cr, Mn, Fe, Co, Ni, Zn, As, Se, Rb, Nb, Zr, Mo, Cd, Sb, REE, Hg, Pb, Th, U, Ra-226, Pb-210 and Po-210. This list was based on abundance and mobility in the ore and tailings and general toxicity of the elements. Fluorine is the most mobile of the elements in both ore and tailings. The concentration in ore and tailings may be up to 1% and in combination with its high toxicity, F can then be regarded as the most serious pollutant. (author) 34 tabs., 32 ills., 63 refs

  14. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities

  15. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  16. Draft Environmental Impact Statement for the tank waste remediation system. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    This document analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of radioactive, hazardous, and mixed waste. This waste is currently or projected to be stored in 177 underground storage tanks and approximately 60 miscellaneous underground storage tanks, and the management and disposal of approximately 1,930 cesium and strontium capsules located at the Hanford Site. This document analyzes the following alternatives for remediating the tank waste: No Action, Long-Term Management, In Situ Fill and Cap, In Situ Vitrification, Ex Situ Intermediate Separations, Ex Situ No Separations, Ex Situ Extensive Separations, and Ex Situ/In Situ Combination. This document also addresses a Phased Implementation alternative (the DOE and Ecology preferred alternative for remediation of tank waste). Alternatives analyzed for the cesium and strontium capsules include: No Action, Onsite Disposal, Overpack and Ship, and Vitrify with Tank Waste. At this time, DOE and Ecology do not have a preferred alternative for the cesium and strontium capsules

  17. Draft environmental impact statement. Los Alamos Scientific Laboratory Site, Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    1978-05-01

    This statement assesses the potential cumulative environmental impacts associated with current and continuing activities at the LASL site. This includes the adverse impacts from postulated accidents associated with the activities. Various effluents including radioactive ones are released to the environment. However, a continuing, comprehensive, monitoring program is carried out to assist in the control of hazardous effluents. Alternatives to current operation of LASL include: cessation or relocation of programs; continue activities as presently constituted; further limitation of adverse impacts by institutional or other improvements in various operations; and expansion of current activities. Liquid, gaseous, and solid wastes are generated as by-products of the laboratory operation. Liquid wastes include radioactively contaminated solutions, chemically contaminated wastes, sanitary sewage, cooling water discharges, and storm drainage. The ordinary sanitary liquid wastes are processed by conventional sewage treatment plants, lagoons, and septic tanks. Industrial liquid wastes are processed by special treatment plants to remove radioactive components and to detoxify or neutralize other chemical agents. The results of analyses of treated effluents released in 1976 are summarized. The treated effluents contain radioactive pollutants at levels of only a few percent of guidelines applicable to exposure to the public from ingestion of water and food

  18. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. Volume 1 of this document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. This volume contains the following appendices: (A) SNS accident source terms for EIS input; (B) Reports on the selection of alternative sites for the SNS; (C) Letters of consultation on protected species and cultural resources; (D) Ecological resource survey reports and summaries; (E) Descriptions of ORNL research projects in the Walker Branch Watershed; (F) Atmospheric dispersion and dose calculations for normal and accident conditions; (G) Projected air quality modeling effects at NOAA's Walker Branch Monitoring Tower

  19. Rocky Flats Plant Site, Golden, Colorado. Volume I. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1977-09-01

    Two previous environmental statements have been issued for the Rocky Flats Plant site. One concerned a new plutonium recovery facility (WASH-1517, USAEC, January 1972); the second concerned land acquisition (WASH-1518, USAEC, April 1972). This document responds to those who indicated concerns and also ERDA's anticipated concerns about activities associated with the Rocky Flats Plant. Most concerns focus on two points including the Plant's involvement in the production of nuclear weapons and the Plant's handling of hazardous materials, particularly the radioactive element plutonium. The production of nuclear weapons, in which the Rocky Flats Plant maintains a vital role, will probably continue for as long as the world situation suggests that this country must have a strong defense. Operations at the Rocky Flats Plant have resulted in some plutonium being released to the environment, but evidence does not indicate that the amounts involved have presented any measurable hazard to human health. Ongoing improvements to the Plant's facilities and operational procedures are intended to preclude any recurrence of past releases. Despite these improvements, some public concern has resulted from past releases and the potential adverse effects from any possible future releases. This DEIS addresses that concern. It comments on past mishaps along with their causes and effects. It discusses current operations plus related costs and benefits to the region. Various alternatives to continuing present operations are explored, and the costs and benefits of the different options are compared

  20. Savannah River Site, spent nuclear fuel management, draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-12-01

    The management of spent nuclear fuel (SNF) has been an integral part of the mission of the Savannah River Site (SRS) for more than 40 years. Until the early 1990s, SNF management consisted primarily of short-term onsite storage and reprocessing in the SRS chemical separation facilities to produce strategic nuclear materials. With the end of the Cold War, the US Department of Energy (DOE) decided to phase out reprocessing of SNF for the production of nuclear weapons materials. Therefore, the management strategy for this fuel has shifted from short-term storage and reprocessing for the recovery of highly-enriched uranium and transuranic isotopes to stabilization, when necessary, and interim storage pending final disposition that includes preparing aluminum-based SNF for placement in a geologic repository. In addition to the fuel already onsite, the SRS will receive SNF from foreign research reactors until 2009 and from domestic research reactors until, potentially, 2035. As a result, the safe and efficient management of SNF will continue to be an important SRS mission. This EIS evaluates the potential environmental impacts of DOE's proposed plans for management SNF assigned to SRS

  1. ANSTO`s radioactive waste management policy. Preliminary environmental review

    Energy Technology Data Exchange (ETDEWEB)

    Levins, D.M.; Airey, P.; Breadner, B.; Bull, P.; Camilleri, A.; Dimitrovski, L.; Gorman, T.; Harries, J.; Innes, R.; Jarquin, E.; Jay, G.; Ridal, A.; Smith, A.

    1996-05-01

    For over forty years, radioactive wastes have been generated by ANSTO (and its predecessor, the AAEC) from the operation of nuclear facilities, the production of radioisotopes for medical and industrial use, and from various research activities. the quantities and activities of radioactive waste currently at Lucas Heights are very small compared to many other nuclear facilities overseas, especially those in countries with nuclear power program. Nevertheless, in the absence of a repository for nuclear wastes in Australia and guidelines for waste conditioning, the waste inventory has been growing steadily. This report reviews the status of radioactive waste management at ANSTO, including spent fuel management, treatment of effluents and environmental monitoring. It gives details of: relevant legislative, regulatory and related requirements; sources and types of radioactive waste generated at ANSTO; waste quantities and activities (both cumulative and annual arisings); existing practices and procedures for waste management and environmental monitoring; recommended broad strategies for dealing with radioactive waste management issues. Detailed proposals on how the recommendations should be implemented is the subject of a companion internal document, the Radioactive Waste Management Action Plan 1996-2000 which provides details of the tasks to be undertaken, milestones and resource requirements. 44 refs., 2 tabs., 18 figs.

  2. ANSTO's radioactive waste management policy. Preliminary environmental review

    International Nuclear Information System (INIS)

    Levins, D.M.; Airey, P.; Breadner, B.; Bull, P.; Camilleri, A.; Dimitrovski, L.; Gorman, T.; Harries, J.; Innes, R.; Jarquin, E.; Jay, G.; Ridal, A.; Smith, A.

    1996-05-01

    For over forty years, radioactive wastes have been generated by ANSTO (and its predecessor, the AAEC) from the operation of nuclear facilities, the production of radioisotopes for medical and industrial use, and from various research activities. the quantities and activities of radioactive waste currently at Lucas Heights are very small compared to many other nuclear facilities overseas, especially those in countries with nuclear power program. Nevertheless, in the absence of a repository for nuclear wastes in Australia and guidelines for waste conditioning, the waste inventory has been growing steadily. This report reviews the status of radioactive waste management at ANSTO, including spent fuel management, treatment of effluents and environmental monitoring. It gives details of: relevant legislative, regulatory and related requirements; sources and types of radioactive waste generated at ANSTO; waste quantities and activities (both cumulative and annual arisings); existing practices and procedures for waste management and environmental monitoring; recommended broad strategies for dealing with radioactive waste management issues. Detailed proposals on how the recommendations should be implemented is the subject of a companion internal document, the Radioactive Waste Management Action Plan 1996-2000 which provides details of the tasks to be undertaken, milestones and resource requirements. 44 refs., 2 tabs., 18 figs

  3. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  4. Draft environmental impact statement. River Bend Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    Federal financing of an undivided ownership interest of River Bend Nuclear Power Station Unit 1 on a 3293-acre site near St. Francisville, Louisiana is proposed in a supplement to the final environmental impact statement of September 1974. The facility would consist of a boiling-water reactor that would produce a maximum of 2894 megawatts (MW) of electrical power. A design level of 3015 MW of electric power could be realized at some time in the future. Exhaust steam would be cooled by mechanical cooling towers using makeup water obtained from and discharged to the Mississippi River. Power generated by the unit would be transmitted via three lines totaling 140 circuit miles traversing portions of the parishes of West Feliciana, East Feliciana, East Baton Rouge, West Baton Rouge, Pointe Coupee, and Iberville. The unit would help the applicant meet the power needs of rural electric consumers in the region, and the applicant would contribute significanlty to area tax base and employment rolls during the life of the unit. Construction related activities would disturb 700 forested acres on the site and 1156 acres along the transmission routes. Of the 60 cubic feet per second (cfs) taken from the river, 48 cfs would evaporate during the cooling process and 12 cfs would return to the river with dissolved solids concentrations increased by 500%. The terrace aquifer would be dewatered for 16 months in order to lower the water table at the building site, and Grants Bayou would be transformed from a lentic to a lotic habitat during this period. Fogging and icing due to evaporation and drift from the cooling towers would increase slightly. During the construction period, farming, hunting, and fishing on the site would be suspended, and the social infractructure would be stressed due to the influx of a maximum of 2200 workers

  5. Draft environmental statement. Wyoming Mineral Corporation, Irigaray solution mining project (Johnson County, Wyoming)

    International Nuclear Information System (INIS)

    1978-04-01

    The Irigaray project consists of solution mining (in situ leaching) operations involving uranium ore deposits in Johnson County, Wyoming. Solution mining activities will include a processing facility with an annual production of 500,000 lb of U 3 O 8 from up to 50 acres of well fields through the initial license authorization. The Irigaray project has an estimated lifetime of 10 to 20 years with known ore deposits and the current level of solution mining technology. Environmental impacts and adverse effects are summarized. The site is mostly used as grazing land for cattle and sheep. Initiation of the Irigaray project would result in the temporary removal from grazing and the disturbance of approximately 60 acres during operation. All disturbed surface areas will be reclaimed and returned to their original use. Approximately 1.2 x 10 6 m 3 (1000 acre-ft) of water will be withdrawn from the ore zone aquifer. This water will be conveyed to the onsite waste ponds for evaporation. An estimated 4.2 x 10 5 m 3 (340 acre-ft) of groundwater is expected to temporarily contain increased concentrations of radioactive and toxic elements during the operation of each 4-ha (10-acre) well field. Restoration should return this water to a condition that is consistent with its premining use (or potential use). There will be no discharge of liquid effluents from the Irigaray project. Atmospheric effluents will be within acceptable limits. The dose rates of radionuclides in the air at the nearest ranches from the plant site are tabulated. The Irigaray project proposes the production and utilization of 500,000 lb per year of uranium resources. The Irigaray project will not produce any significant socioeconomic impact on the local area because of the small number of employees that will be employed at the project

  6. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 1

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. The US needs a high-flux, short-pulsed neutron source to provide the scientific and industrial research communities with a much more intense source of pulsed neutrons for neutron scattering research than is currently available, and to assure the availability of a state-of-the-art facility in the decades ahead. This next-generation neutron source would create new scientific and engineering opportunities. In addition, it would help replace the neutron science capacity that will be lost by the eventual shutdown of existing sources as they reach the end of their useful operating lives in the first half of the next century. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL (US); Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM

  7. Draft environmental statement related to the operation of Limerick Generating Station, Units 1 and 2. Docket Nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1983-06-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Limerick Generating Station, Units 1 and 2, pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity

  8. Preliminary environmental analysis of a geopressured-geothermal test well in Brazoria County, Texas

    Energy Technology Data Exchange (ETDEWEB)

    White, W.A.; McGraw, M.; Gustavson, T.C.; Meriwether, J.

    1977-11-16

    Preliminary environmental data, including current land use, substrate lithology, soils, natural hazards, water resources, biological assemblages, meteorological data, and regulatory considerations have been collected and analyzed for approximately 150 km/sup 2/ of land near Chocolate Bayou, Brazoria County, Texas, in which a geopressured-geothermal test well is to be drilled in the fall of 1977. The study was designed to establish an environmental data base and to determine, within spatial constraints set by subsurface reservoir conditions, environmentally suitable sites for the proposed well. Preliminary analyses of data revealed the eed for focusing on the following areas: potential for subsidence and fault activation, susceptibility of test well and support facilities to fresh- and salt-water flooding, possible effects of produced saline waters on biological assemblages and groundwaer resources, distribution of expansive soils, and effect of drilling and associated support activities on known archeological-cultural resources.

  9. Environmental Survey preliminary report, Strategic Petroleum Reserve, Texas and Louisiana Gulf Coast

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Strategic Petroleum Reserve (SPR), located in Louisiana and Texas, and conducted in two segments from November 30 through December 11, 1987, and February 1 through 10, 1988. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with SPR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involved the review of existing site environmental data, observations of the operations carried on at SPR, and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the SPR Survey findings for inclusion into the Environmental Survey Summary Report. The Summary Report will reflect the final determinations of the SPR Survey and the other DOE site-specific Surveys. 200 refs., 50 figs., 30 tabs.

  10. Preliminary testing of the Scanning Laser Environmental Airborne Fluorosensor

    International Nuclear Information System (INIS)

    Brown, C.E.; Marois, R.; Fingas, M.F.; Mullin, J.V.

    2000-01-01

    The installation and testing program of the Scanning Laser Environmental Airborne Fluorosensor (SLEAF) on Environment Canada's DC-3 aircraft was described and the capabilities of the new system were presented. SLEAF is a new generation of laser fluorosensor designed to provide prompt reliable detection and mapping of oil pollution in different marine and terrestrial environments. It consists of a high-power excimer laser, high-resolution range-gated intensified diode-array spectrometer, and a pair of variable speed and angular displacement scanning mirrors. SLEAF is capable of detecting narrow bands of oil that can pile up along the high tide lines of beaches and shorelines, including those that contain ice and snow. It also has the added benefit of providing real-time detection. SLEAF will be declared operational for emergency response personnel when the initial test flight program will be completed in the near future. 9 refs., 2 figs

  11. Gulf of Mexico sales 147 and 150: Central and western planning areas. Draft environmental impact statement. Volume 2. Sections IV.D through IX. Draft report

    International Nuclear Information System (INIS)

    1993-04-01

    Contents: environmental impacts of the proposed actions and alternatives; proposed central gulf sale 147; proposed western gulf sale 150; analysis of a large oil spill; consultation and coordination; bibliography and special references; glossary; appendices

  12. Preliminary design of a priority system for DOE environmental restoration

    International Nuclear Information System (INIS)

    Longo, T.P.; Whitfield, R.P.; Cotton, T.A.; Merkhofer, M.W.

    1990-01-01

    For over 40 yr, the US Department of Energy (DOE) and predecessor agencies have managed the production of nuclear materials and weapons for national defense. Operations at facilities in ∼20 states have produced hundreds, perhaps thousands, of contaminated sites. The DOE is committed to cleaning up these sites over a 30-yr period. The cleanup will cost tens of billions of dollars. To assist in the process of formulating and allocating the budget for cleaning up these sites, DOE is developing a risk-based priority system. The system will be a formal decision-aiding tool addressing health and safety risks as well as social, technical, economic, and policy issues. It will ensure that funding decisions reflect the primary goals of protecting public health and the environment and complying with regulatory requirements and agreements. The system also will ensure that decisions are made in a technically defensible and even-handed manner. The primary purpose of the system is to provide information useful for two types of DOE budgetary decisions. One is identifying desirable budget levels and formulating DOE's annual budget request. The other is allocating in the most effective way the funds appropriated by Congress. The priority system will initially apply to DOE's environmental restoration (ER) program, which involves assessing, cleaning up, and closing inactive waste sites and surplus facilities

  13. Environmental Survey preliminary report, Los Alamos National Laboratory, Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Los Alamos National Laboratory (LANL), conducted March 29, 1987 through April 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the LANL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the LANL, and interviews with site personnel. The Survey team developed Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Idaho National Engineering Laboratory. When completed, the results will be incorporated into the LANL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the LANL. 65 refs., 68 figs., 73 tabs.

  14. Environmental Survey preliminary report, Los Alamos National Laboratory, Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Los Alamos National Laboratory (LANL), conducted March 29, 1987 through April 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the LANL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the LANL, and interviews with site personnel. The Survey team developed Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Idaho National Engineering Laboratory. When completed, the results will be incorporated into the LANL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the LANL. 65 refs., 68 figs., 73 tabs

  15. Environmental Survey preliminary report, Oak Ridge National Laboratory (X-10), Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1988-07-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL), X-10 site, conducted August 17 through September 4, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with ORNL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORNL, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for ORNL. The Interim Report will reflect the final determinations of the ORNL Survey. 120 refs., 68 figs., 71 tabs.

  16. 3.1.SUIT. Draft EA procedure applicable to historical areas active conservation

    DEFF Research Database (Denmark)

    Algreen-Ussing, Gregers; Wedebrunn, Ola

    2002-01-01

    This document is a preliminary draft for an Environmental Impact Assessment procedure. Its aim is to provide draft guidelines for the assessment of likely significant effects of urban development projects on the urban environment including material assets and cultural heritage. This procedure...... is intended as a way to propose and ensure an active conservation policy for urban historical areas. It is based on state-of-the-art methods and the knowledge of the experts involved in the SUIT project. It is also based on the guidelines presenting the grid of analysis to be used by stakeholders in a joint...

  17. 78 FR 65301 - Notice of Availability of a Draft Supplement to the July 2011 Environmental Impact Statement for...

    Science.gov (United States)

    2013-10-31

    ... DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Notice of Availability of a Draft...) Extension and Proposed US 17 Hampstead Bypass New Hanover and Pender Counties in North Carolina, NCDOT TIP Projects U-4751 and R- 3300 AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD. ACTION...

  18. 76 FR 15968 - Notice of Availability of the Draft Environmental Impact Statement and Public Hearing Notice for...

    Science.gov (United States)

    2011-03-22

    ... management; human health, safety, and accidents; and noise and vibration. Availability of the Draft EIS... be accepted in the order in which they are received during the hearing. Speakers are encouraged to provide a written version of their oral comments or supplementary materials for the record. Each speaker...

  19. 78 FR 17713 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Pan Mine...

    Science.gov (United States)

    2013-03-22

    ... INFORMATION: Midway Gold US, Inc., (Midway) proposes to construct and operate an open-pit gold mining operation in the northern part of the Pancake Mountain Range, approximately 50 miles west of Ely in White... (May 2004) and the Midway Gold Pan Project Exploration Amendment EA (July 2011). The Draft EIS...

  20. 75 FR 41514 - Notice of Availability of a Draft Environmental Impact Statement for the Greater Natural Buttes...

    Science.gov (United States)

    2010-07-16

    ... and 22 East (Salt Lake Meridian) in Uintah County, Utah. The Draft EIS analyzes a proposal by KMG to... drilled as infill to productive formations, including but not limited to, the Green River Formation, Wasatch Formation, Mesaverde Group (including the Blackhawk Formation), Mancos Shale, and Dakota Sandstone...

  1. 75 FR 2145 - Notice of Availability of a Draft Environmental Impact Statement for the Construction of a New...

    Science.gov (United States)

    2010-01-14

    ... of existing government structures at the existing LPOE; (c) construction of a main administration... a functional secondary inspection area for commercial vehicles Accommodate future demands and new... individuals, organizations and agencies to submit comments concerning the content and findings of the Draft...

  2. 78 FR 76288 - Notice of Intent To Prepare a Draft Environmental Impact Statement and Dam Safety Modification...

    Science.gov (United States)

    2013-12-17

    ..., water supply, land use, recreation, visual and aesthetic resources, traffic and transportation... draft EIS will address an array of remediation alternatives that could reduce the risk of life loss, extensive downstream damage, functional loss of the project, and the loss of all project benefits. The...

  3. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs.

  4. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs

  5. Environmental Survey preliminary report, Princeton Plasma Physics Laboratory, Princeton, New Jersey

    International Nuclear Information System (INIS)

    1989-05-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Princeton Plasma Physics Laboratory (PPPL), conducted June 13 through 17, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Team members are being provided by private contractors. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with PPPL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at PPPL, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S ampersand A) Plan to assist in further assessing certain of the environment problems identified during its on-site activities. The S ampersand A plan is being developed by the Idaho National Engineering Laboratory. When completed, the S ampersand A results will be incorporated into the PPPL Survey findings for inclusion in the Environmental Survey Summary Report. 70 refs., 17 figs., 21 tabs

  6. Environmental Survey preliminary report, Laboratory for Energy-Related Health Research, Davis, California

    International Nuclear Information System (INIS)

    1988-03-01

    This report presents the preliminary findings from the first phase of the Survey of the United States Department of Energy (DOE) Laboratory for Energy-Related Health Research (LEHR) at the University of California, Davis (UC Davis), conducted November 16 through 20, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the LEHR. The Survey covers all environmental media and all areas of environmental regulation, and is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations at the LEHR and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the LEHR at UC Davis. The Interim Report will reflect the final determinations of the LEHR Survey. 75 refs., 26 figs., 23 tabs

  7. EPA scientific integrity policy draft

    Science.gov (United States)

    Showstack, Randy

    2011-08-01

    The U.S. Environmental Protection Agency (EPA) issued its draft scientific integrity policy on 5 August. The draft policy addresses scientific ethical standards, communications with the public, the use of advisory committees and peer review, and professional development. The draft policy was developed by an ad hoc group of EPA senior staff and scientists in response to a December 2010 memorandum on scientific integrity from the White House Office of Science and Technology Policy. The agency is accepting public comments on the draft through 6 September; comments should be sent to osa.staff@epa.gov. For more information, see http://www.epa.gov/stpc/pdfs/draft-scientific-integrity-policy-aug2011.pdf.

  8. Preliminary evaluation of environmental issues on the use of peat as an energy source

    Energy Technology Data Exchange (ETDEWEB)

    King, R.; Richardson, S.; Walters, A.; Boesch, L.; Thomson, W.; Irons, J.

    1980-03-14

    A study to characterize the environmental issues, that would arise from an extensive peat utilization program has been initiated. The objectives of this preliminary report are to: identify the environmental issues and potential problems; examine the significance of issues in the geographical regions where peat use could be developed; and establish a methodology by which issues can be resolved or clarified through future coordinated private, state, and federal programs. An overview of peat development including discussions on conversion technologies, extraction and harvesting procedures, and land reclamation is presented. Environmental concerns are in the areas of water resources and quality, air quality, health and safety issues, solid waste management, and land reclamation. The general environmental issues, resource availability, and attitudes associated with potential peat development in ten states, containing an estimated 90 percent of US peat resources were described. The ten states reviewed are Alaska, Minnesota, Michigan, Maine, North and South Carolina, Wisconsin, New York, Florida, and Louisiana. (DMC)

  9. Teacher-Board Relations in Connecticut: A Summary of the Law Regarding Scope of Negotiations, Good Faith Bargaining, and Unfair Labor Practices. Preliminary Draft.

    Science.gov (United States)

    Zirkel, Perry A.

    This document is a discussion draft intended to lead to the formulation of a set of guidelines by the state board of education concerning three areas of teacher negotiations: scope, good faith bargaining, and prohibited practices. It has been prepared in the form of an organized data base that focuses on summarizing the present state of the law…

  10. Draft environmental statement related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457)

    International Nuclear Information System (INIS)

    1983-12-01

    The Draft Environment Statement contains the second assessment of the environmental impact associated with the operation of Braidwood Station, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeologic sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomi effects of the project will be beneficial. On the basis of the analysis and evaluation set forth in this environmental statement, it is concluded that the action called for under NEPA and 10 CFR 51 is the issuance of operating licenses for Braidwood Station, Units 1 and 2

  11. Draft environmental statement related to the operation of Shearon Harris Nuclear Power Plant, Units 1 and 2. Docket Nos. STN 50-400 and STN 50-401

    International Nuclear Information System (INIS)

    1983-04-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Shearon Harris Nuclear Power Plant, Units 1 and 2, pursuant to the National Environmental Policy Act of 1979 (NEPA) and 10 CFR 51, as amended, of the NRC regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic-ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socio-economic effects of the project will be beneficial. The action called for is the issuance of an operating license for Shearon Harris PLant, Units 1 and 2

  12. Preliminary comparative estimate of the environmental externalities of the electrical generation in Cuba

    International Nuclear Information System (INIS)

    Turtos Carbonell, L.

    1998-01-01

    Determination of the externalises associated with the electrical generation and fundamentally its atmospherically environmental impact, win greater importance nowadays, with the objective that to medium term these could be incorporated into the economy of electricity production as the surest way to reduce this impact. In the work is accomplished a comparative preliminary estimate of the externalises of the electrical generation in Cuba based in the results obtained in the External Project (Externalises of Energy) and the emissions of the domestic Power Plant. Different processes to reduce these emissions are proposed. The economic feasibility of installing Abatement Emissions Technologies based on the calculated externalises is analyzed

  13. Draft environmental assessment for characterization of the Hanford Site pursuant to the Nuclear Waste Policy Act of 1982 (Public Law 97-425), Hanford Site, Richland, Benton County, Washington

    International Nuclear Information System (INIS)

    1983-02-01

    The Hanford Site is evaluated in this draft environmental assessment. The results of this evaluation are the basis for nominating the Hanford Site for site characterization leading to selection of the first repository site. The major conclusions are presented. 120 refs., 26 figs., 8 tabs

  14. 32 CFR Appendix C to Part 989 - Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS)

    Science.gov (United States)

    2010-07-01

    ... hiring the court reporter, funds temporary duty costs for the hearing officer, makes logistical...) DEPARTMENT OF THE AIR FORCE ENVIRONMENTAL PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) Pt. 989...

  15. Supplemental results of the human health risk analysis for the U.S. Department of Energy draft waste management programmatic environmental impact statement

    International Nuclear Information System (INIS)

    1995-08-01

    This report is intended as an information supplement to the human health risk analysis performed for the US Department of Energy's Draft Waste Management Programmatic Environmental Impact Statement for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste, hereinafter called the PEIS. This report provides the installation-by-installation human health risk analysis results from which the risk estimate summaries for the PEIS were drawn. Readers should bear in mind that the risk estimates presented here are the result of a program-wide (as opposed to site-specific) study. They are based on best available data; systematically applied assumptions; and professional judgment about DOE waste inventories, waste volumes generated annually, currently available treatment and disposal technologies, technical limitations of treatment, and facility capacities across the numerous installations in the DOE complex

  16. Draft environmental statement related to the decommissioning of the Rare Earths Facility, West Chicago, Illinois. Docket No. 40-2061. Kerr-McGee Chemical Corporation

    International Nuclear Information System (INIS)

    1982-05-01

    This Draft Environmental Impact Statement is issued by the US Nuclear Regulatory Commission in response to the plan proposed by Kerr-McGee Chemical Corporation for the decommissioning of their Rare Earths Facility located in West Chicago, Illinois. The statement considers the Kerr-McGee preferred plan and various alternatives to that plan. The action proposed by the Commission is the renewal of the Kerr-McGee license to allow safe storage of the radioactive wastes onsite for a period of 5 years. At the end of this period, the following alternatives will be evaluated: (1) Renewal of the license for an additional period of 5 years and the possible imposition of additional conditions or remedial actions; (2) Removal of the material to a licensed low-level waste disposal site; and (3) Termination of the license and transfer of the property to federal or state ownership

  17. Operating performance and environmental and safety risks: A preliminary comparison of majors and independents

    International Nuclear Information System (INIS)

    Pulsipher, A.G.; Iledare, W.O.; Baumann, R.H.; Mesyanzhinov, D.

    1995-01-01

    The objective is to compare the safety and environmental records of oil and gas companies operating on the OCS in the Gulf of Mexico over the past decade. The reason for doing so is to help inform public sector policy-makers and private sector decision-makers about the potential safety and environmental risks associated with the expected increased presence of smaller independents in the domestic oil and gas industry in general and on the federal OCS in particular. The preliminary conclusion is that although independents have had a modestly high incidence of fires and explosions than the majors, the difference is not significant statistically and is largely attributable to a few ''bad actors'' rather than demonstrably poorer practice by the group as a whole

  18. Site study plan for utilities and solid waste, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site plan describes utilities and solid waste studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. After utilities and solid waste information needs derived from Federal, State, and local statutes and regulations and the project specifications are briefly described, the site study plan describes the study design and rationale, the field data collection procedures and equipment, and data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs to characterize electrical power, natural gas, communication, water, wastewater sludge, nonradiological solid waste, nonradiological hazardous waste, and low-level radiological waste. These programs include details for the collection of project needs, identification of utilities and solid waste disposal contractor capabilities, and verification of the obtained data. Utilities and solid waste field activities will begin approximately at the time of site access. Utilities and solid waste characterization will be completed within the first year of activity. 29 refs., 6 figs., 2 tabs

  19. Site Study Plan for meteorology/air quality, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Meteorological/Air Quality Site Study Plan describes a field program consisting of continuous measurements of surface (10-meter) wind speed and direction, temperature, humidity, dew point, pressure, and sensible heat flux (vertical). Air quality measurements will be limited to suspended particulate matter. After the first year of measurements, a 60-meter tower will be added to incorporate measurements needed for later modeling and dose calculations; these will include upper level winds, vertical temperature structure, and vertical wind speed. All of these measurements will be made at a site located within the 9-mi 2 site area but remote from the ESF. A second site, located near and downwind from the ESF, will monitor only particulate matter. The SSP describes the need for each study; its design and design rationale; analysis, management, and use of data, schedule of field activities, organization of field personnel and sample management, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from the Salt Repository Project Requirements Document. 38 refs., 8 figs., 3 tabs

  20. Norms for environmentally responsible behaviour: An extended taxonomy and a preliminary assessment

    DEFF Research Database (Denmark)

    Thøgersen, John

    The currently used concept of personal or moral norms is ambiguous with regard to its motivational content. Therefore, a revision of the norm taxonomy is suggested, implying a distinction between three types of personal norms, called introjected, identified, and integrated norms. A preliminary as...... is also supported, with the reservation that the different behavioural references are more than just different methods of measuring the same latent construct(s). People evidently hold different norms for different environmentally responsible behaviours.......The currently used concept of personal or moral norms is ambiguous with regard to its motivational content. Therefore, a revision of the norm taxonomy is suggested, implying a distinction between three types of personal norms, called introjected, identified, and integrated norms. A preliminary...... assessment of the taxonomy is carried out based of a survey of a random sample of Danish residents 18 years or older. A range of norm constructs were measured with regard to four environmentally relevant behaviours: buying organic milk, buying energy saving light bulbs, source-separating compostable kitchen...

  1. Radiological health review of the Draft Environmental Impact Statement (DOE/EIS-0026-D) Waste Isolation Pilot Plant, US Department of Energy. Report EEG-3

    International Nuclear Information System (INIS)

    Neill, R.H.; Channell, J.K.; Wofsy, C.; Greenfield, M.A.

    1979-08-01

    This review of radiological health considerations contains a number of concerns, questions and recommendations that should be addressed by the Department of Energy in the final Environmental Impact Statement (EIS) for the Waste Isolation Pilot Plant (WIPP). Using the assumptions contained in the Draft Environmental Impact Statement (DEIS), the Environmental Evaluation Group (EEG) calculated a number of radiation doses and the results were found to be in general agreement with those presented in the DEIS. The doses resulting from the operational and long-range releases from WIPP to the general population are no more than a fraction of existing radiation doses to the public. However, there are a number of technical considerations in the assessment of radiation exposure that were not adequately evaluated in the DEIS. They are discussed in this review. A number of additional dosage estimates have been identified that need to be calculated by both DOE and EEG. As the DEIS did not contain estimates of the amounts of radioactivity to be permanently located in the repository, it was necessary to calculate these amounts. Health effects, transportation, waste acceptance criteria, site evaluation, site selection criteria, operational exposure, the experimental waste program, long term radiation releases, retrievability, and decommissioning are the categories of the DEIS which were evaluated

  2. Lawrence Livermore National Laboratory Decontamination and Waste Treatment Facility: Documentation of impact analysis for design alternatives presented in the Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1988-05-01

    Lawrence Livermore National Laboratory (LLNL) is proposing to construct and operate a new Decontamination and Waste Treatment Facility (DWTF). The proposed DWTF would replace the existing Hazardous Waste Management (HWM) facilities at LLNL. The US Department of Energy (DOE) is preparing a Draft Environmental Impact Statement (DEIS) to assess the environmental consequences of the proposed DWTF and its alternatives. This report presents the assumptions, methodologies, and analyses used to estimate the waste flows, air emissions, ambient air quality impacts, and public health risks that are presented in the DEIS. Two DWTF design alternatives (Level I and Level II) have been designated as reasonable design alternatives considering available technologies, environmental regulations, and current and future LLNL waste generation. Both design alternatives would include new, separate radioactive and nonradioactive liquid waste treatment systems, a solidification unit, a new decontamination facility, storage and treatment facilities for reactive materials, a radioactive waste storage area, receiving and classification areas, and a uranium burn pan. The Level I design alternative would include a controlled-air incinerator system, while the Level II design alternative would include a rotary kiln incinerator system. 43 refs., 4 figs., 24 tabs

  3. Will environmental interventions affect the level of mastery motivation among children with disabilities? A preliminary study.

    Science.gov (United States)

    Waldman-Levi, Amiya; Erez, Asnat Bar-Haim

    2015-03-01

    Children with developmental disabilities tend to demonstrate lower levels of mastery motivation in comparison with typically developing children. The goal of this study was to investigate the effect of physical and social environmental interventions on the mastery motivation of children with disabilities. Participants included 19 children (from two classes) with disabilities between the ages of 2-4 years from an educational rehabilitation centre. The Individualized Assessment of Mastery Motivation was used to assess the level of mastery motivation; the Early Childhood Environment Rating Scale - Revised and the Teacher-Child Interaction Observation were used to assess the physical and social environments. A counterbalance study design was used such that the children from the two classes received two phases of intervention, social and physical environmental interventions. The study's results point to the advantage of the social intervention, over the physical one, in improving the child's mastery motivation. However, the results lend support for the efficacy of using both aspects of environmental changes to the overall persistent score. The study findings, although preliminary, demonstrate the efficacy of providing both social and physical environmental interventions to improve mastery motivation. Copyright © 2014 John Wiley & Sons, Ltd.

  4. 76 FR 50809 - Notice of Availability of a Draft Environmental Assessment for a Proposed Airport Traffic Control...

    Science.gov (United States)

    2011-08-16

    ... National Environmental Policy Act of 1969 (NEPA) and FAA Order 1050.1E, Environmental Impacts: Policies and... is available for public review during a 30-day public comment period at Swanton Pubic Library, 305...

  5. 75 FR 9014 - Notice of Availability of a Draft Environmental Assessment for a Proposed Airport Traffic Control...

    Science.gov (United States)

    2010-02-26

    ... with the requirements of the National Environmental Policy Act of 1969 (NEPA) and FAA Order 1050.1E, Environmental Impacts: Policies and Procedures. The DEA analyzes the potential environmental impacts that may... the following libraries: Kalamazoo Public Library, Washington Square Branch, 1244 Portage Street...

  6. 76 FR 27743 - Notice of Availability of a Draft Environmental Assessment for a Proposed Airport Traffic Control...

    Science.gov (United States)

    2011-05-12

    ... the requirements of the National Environmental Policy Act of 1969 (NEPA) and FAA Order 1050.1E, Environmental Impacts: Policies and Procedures. The DEA analyzes the potential environmental impacts that may... available for public review during a 30-day public comment period at the following libraries: Champaign...

  7. Environmental Survey preliminary report, Department of Energy (DOE) activities at Santa Susana Field Laboratories, Ventura County, California

    Energy Technology Data Exchange (ETDEWEB)

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) activities at the Santa Susana Field Laboratories Site (DOE/SSFL), conducted May 16 through 26, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual participants for the Survey team are being supplied by an private contractor. The objective of the survey is to identify environmental problems and areas of environmental risk associated with DOE activities at SSFL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at SSFL, and interviews with site personnel. 90 refs., 17 figs., 28 tabs.

  8. Preliminary environmental assessment for the Satellite Power System (SPS). Revision 1. Volume 2. Detailed assessment

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The Department of Energy (DOE) is considering several options for generating electrical power to meet future energy needs. The satellite power system (SPS), one of these options, would collect solar energy through a system of satellites in space and transfer this energy to earth. A reference system has been described that would convert the energy to microwaves and transmit the microwave energy via directive antennas to large receiving/rectifying antennas (rectennas) located on the earth. At the rectennas, the microwave energy would be converted into electricity. The potential environmental impacts of constructing and operating the satellite power system are being assessed as a part of the Department of Energy's SPS Concept Development and Evaluation Program. This report is Revision I of the Preliminary Environmental Assessment for the Satellite Power System published in October 1978. It refines and extends the 1978 assessment and provides a basis for a 1980 revision that will guide and support DOE recommendations regarding future SPS development. This is Volume 2 of two volumes. It contains the technical detail suitable for peer review and integrates information appearing in documents referenced herein. The key environmental issues associated with the SPS concern human health and safety, ecosystems, climate, and electromagnetic systems interactions. In order to address these issues in an organized manner, five tasks are reported: (I) microwave-radiation health and ecological effects; (II) nonmicrowave health and ecological effectss; (III) atmospheric effects; (IV) effects on communication systems due to ionospheric disturbance; and (V) electromagnetic compatibility. (WHK)

  9. 76 FR 15302 - Notice of Public Hearing for the Draft Environmental Impact Statement for the TRIDENT Support...

    Science.gov (United States)

    2011-03-21

    .... Alternatives were evaluated within several environmental resource areas including marine, upland, and social..., coastal and shoreline management, land use and recreation, aesthetics, socioeconomics, utilities and...

  10. 78 FR 63169 - Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Navy Base Intermodal...

    Science.gov (United States)

    2013-10-23

    ..., economics, visual resources/aesthetics, general environmental concerns, historic properties, fish and... necessarily be limited to, Section 401 of the Clean Water Act; Essential Fish Habitat (EFH) consultation...

  11. 76 FR 60474 - Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Haile Gold Mine in...

    Science.gov (United States)

    2011-09-29

    ..., economics, aesthetics, general environmental concerns, historic properties, fish and wildlife values, flood... necessarily be limited to, Section 401 of Clean Water Act; Essential Fish Habitat (EFH) consultation...

  12. Exemption from licensing requirements for spark-gap irradiators that contain cobalt-60: (Docket No. PRM 30-54): Draft environmental statement

    International Nuclear Information System (INIS)

    1975-09-01

    This Draft Statement on environmental considerations associated with the proposed exemption of cobalt-60 in spark-gap irradiators was prepared by the US Nuclear Regulatory Commission, Office of Standards Development (the staff), in accordance with the Commission's regulation 10 CFR Part 51, which implements the requirements of the National Environmental Policy Act of 1969 (NEPA). The NEPA states, among other things, that the federal government has the continuing responsibility to use all practicable means, consistent with other essential considerations of national policy, to improve and to coordinate federal plans, functions, programs, and resources to the end that the nation may: fulfill the responsibilities of each generation as trustee of the environment for succeeding generations; assure for all Americans safe, healthful, productive, and esthetically and culturally pleasing surroundings; attain the widest range of beneficial uses of the environment without degradation, risk to health or safety, or other undesirable and unintended consequences; preserve important historic, cultural, and natural aspects of our national heritage, and maintain, wherever possible, an environment which supports diversity and variety of individual choice; achieve a balance between population and resource use which will permit high standards of living and a wide sharing of life's amenities; and enhance the quality of renewable resources and approach the maximum attainable recycling of depletable resources. 42 refs., 5 figs., 7 tabs

  13. Preliminary results of measurement of natural environmental radiation levels and doses to population in China

    International Nuclear Information System (INIS)

    Wang Qiliang; He Miaoting; Shu Qi

    1985-01-01

    In this paper the preliminary results of measurement of natural environmental radiation levels in China with RSS-111 high pressure ionization chamber and estimated doses to population are reported. A total of 2,723 indoor locales throughout China were measured. The results showed that the average absorbed dose rates in air due to gamma radiation for indoors and outdoors were 11.0 x 10 -8 Gy.h -1 and 7.4 x 10 -8 Gy.h -1 , respectively, and those due to cosmic rays were 3.2 x 10 -8 Gy.h -1 and 3.7 x 10 -8 Gy.h -1 , respectively. The annual average effective dose equivalent to population was 919 μSv, including 630 μSv from natural gamma radiation and 289 μSv from cosmic rays

  14. 76 FR 70169 - Draft Supplement 2 to Final Environmental Statement Related to the Operation of Watts Bar Nuclear...

    Science.gov (United States)

    2011-11-10

    ... Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2; Tennessee Valley Authority... on NUREG-0498, ``Final Environmental Statement, Supplement 2, Related to the Operation of Watts Bar... the Nuclear Regulatory Commission. Stephen J. Campbell, Chief, Watts Bar Special Projects Branch...

  15. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Science.gov (United States)

    2010-01-01

    ... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...

  16. 77 FR 68748 - Intent To Prepare a Draft Environmental Impact Statement and Feasibility Report for the Cano...

    Science.gov (United States)

    2012-11-16

    ... recreation and tourism, with minimal temporary negative impact on the ecosystem and the adjacent communities... Environmental Impact Statement and Feasibility Report for the Cano Martin Pena Ecosystem Restoration, San Juan... Environmental Impact Statement (DEIS) and Feasibility Report (FR) for the ecosystem restoration of the Cano...

  17. 77 FR 9635 - Notice of Availability of a Draft Environmental Impact Statement in Cooperation With the North...

    Science.gov (United States)

    2012-02-17

    ... Environmental Impact Statement in Cooperation With the North Carolina Department of Transportation for the... Engineer, telephone: (919) 707-6018. SUPPLEMENTARY INFORMATION: The COE in cooperation with the North... agencies on this project's Merger 01 team include the: U.S. Environmental Protection Agency; U.S. Fish and...

  18. A preliminary strategic environmental impact assessment of mineral and hydrocarbon activities on the Nuussuaq peninsula, West Greenland

    Energy Technology Data Exchange (ETDEWEB)

    Boertmann, D.; Asmund, G.; Glahder, C.; Tamstorf, M.

    2008-01-15

    There is an increasing interest for mineral and hydrocarbon exploration in Greenland and in both regards the Nuussuaq peninsula is in focus. This preliminary strategic environmental impact assessment describes the status of the biological knowledge from the area and designates potential conflicts between activities and the biological environment. Furthermore biological knowledge gaps are identified. These should be filled before specific environmental impacts assessments can be carried out and relevant studies to fill these data gaps are proposed. (au)

  19. The Historically Black Colleges and Universities/Minority Institutions Environmental Technology Consortium annual report draft, 1995--1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The HBCU/MI ET Consortium was established in January 1990, through a memorandum of Understanding (MOU) among its member institutions. This group of research-oriented Historically Black Colleges and Universities and Minority Institutions (HBCUs/MIs) agreed to work together to initiate or revise educational programs, develop research partnerships with public and private sector organizations, and promote technology development and transfer to address the nation`s critical environmental problems. While the Consortium`s Research, Education and Technology Transfer (RETT) Plan is the cornerstone of its overall program efforts, the initial programmatic activities of the Consortium focused on environmental education at all levels with the objective of addressing the underrepresentation of minorities in the environmental professions. This 1996 Annual Report provides an update on the activities of the Consortium with a focus on environmental curriculum development for the Technical Qualifications Program (TQP) and Education for Sustainability.

  20. 78 FR 49735 - Intent To Prepare a Draft Environmental Impact Statement for Dam Safety Study, Lake Lewisville...

    Science.gov (United States)

    2013-08-15

    ... determine appropriate permanent methods for correcting potential problems, interim risk reduction measures... Environmental Impact Statement for Dam Safety Study, Lake Lewisville Dam, Elm Fork Trinity River, Denton County... primary purposes of the project are flood risk management, [[Page 49736

  1. 76 FR 77855 - Detroit Edison Company; Notice of Availability of Errata Sheet for the Draft Environmental Impact...

    Science.gov (United States)

    2011-12-14

    ... Information Contact: Mr. Bruce Olson, Project manager, Environmental Projects Branch 2, Division of New.... Telephone: (301) 415-3731; email: Bruce.Olson@nrc.gov . Dated at Rockville, Maryland, this 7th day of...

  2. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Science.gov (United States)

    2011-09-23

    ... policies and emphasis on the management of public lands and local land use planning; and new data that have... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD06000, L16100000.DP0000] Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement...

  3. Dresden Nuclear Power Station, Unit No. 1: Primary cooling system chemical decontamination: Draft environmental statement (Docket No. 50-10)

    International Nuclear Information System (INIS)

    1980-05-01

    The staff has considered the environmental impact and economic costs of the proposed primary cooling system chemical decontamination at Dresden Nuclear Power Station, Unit 1. The staff has focused this statement on the occupational radiation exposure associated with the proposed Unit 1 decontamination program, on alternatives to chemical decontamination, and on the environmental impact of the disposal of the solid radioactive waste generated by this decontamination. The staff has concluded that the proposed decontamination will not significantly affect the quality of the human environment. Furthermore, any impacts from the decontamination program are outweighed by its benefits. 2 figs., 7 tabs

  4. 78 FR 63971 - Draft Supplemental Environmental Impact Statement for the Introduction of the P-8A Multi-Mission...

    Science.gov (United States)

    2013-10-25

    ... the Introduction of the P-8A Multi-Mission Maritime Aircraft Into the U.S. Navy Fleet; Rescheduling of... Environmental Impact Statement (SEIS) for the Introduction of the P-8A Multi-Mission Maritime Aircraft into the... to December 2, 2013. FOR FURTHER INFORMATION CONTACT: Naval Facilities Engineering Command Atlantic...

  5. 76 FR 57983 - Notice of the Availability of the Draft Framework for the U.S.-Mexico Environmental Program...

    Science.gov (United States)

    2011-09-19

    ...]a de Medio Ambiente y Recursos Naturales (Mexico's Secretariat of Environment and Natural Resources..., El Paso, TX 79902. Fax: (915) 544-6026. Secretaria del Medio Ambiente y Recursos Naturales (SEMARNAT...). ACTION: Notice. SUMMARY: The U.S. Environmental Protection Agency (EPA) and the Secretaria de Medio...

  6. 75 FR 68312 - Notice of Availability of a Draft Environmental Impact Statement (DEIS) for New Medium- and Heavy...

    Science.gov (United States)

    2010-11-05

    ..., and environmental justice. It examines impacts on the U.S. and on a global scale. In addition, the... submitting the comment (or signing the comment, if submitted on behalf of an association, business, labor... potential impacts on air quality, CO 2 emissions, global mean surface temperature, precipitation, and sea...

  7. 75 FR 66078 - Draft Environmental Impact Statement/Staff Assessment for the Solar Reserve LLC Rice Solar Energy...

    Science.gov (United States)

    2010-10-27

    ... Assessment for the Solar Reserve LLC Rice Solar Energy Project, Riverside County, CA (DOE/ EIS-0439) and...) Plan Amendment, as a joint environmental analysis document for the proposed Rice Solar Energy Project... two new on-site wells. Rice Solar Energy, LLC (RSE) has applied to Western to interconnect the...

  8. 76 FR 70125 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Solar Reserve...

    Science.gov (United States)

    2011-11-10

    ... Environmental Impact Statement for the Proposed Solar Reserve LLC Quartzsite Solar Energy Project, La Paz County... (DEIS) for the proposed Quartzsite Solar Energy Project (Project), in La Paz County, Arizona, and the... http://www.blm.gov/az/st/en/prog/energy/solar/quartzsite_solar_energy.html . Copies of the document are...

  9. 76 FR 68741 - Notice of Intent To Prepare a Draft Environmental Impact Statement/Environment Impact Report...

    Science.gov (United States)

    2011-11-07

    ... Wildlife Service (Service), National Marine Fisheries Service (NMFS), and Environmental Protection Agency... habitats and increasing freshwater wetland and riparian habitats. Sensitive flora and fauna currently... in each alternative, such as micro-grading and the use of short cobble-blocking structures at the...

  10. 77 FR 75622 - Intent To Prepare a Draft Supplemental Environmental Impact Statement for Development of a Long...

    Science.gov (United States)

    2012-12-21

    ... Supplemental Environmental Impact Statement for Development of a Long-Term Sediment Management Plan of the... authorized work is described in the October 1985 report of the Chief of Engineers titled, Mount St. Helens... open construction project that was authorized in August 1985. The State of Washington is the non...

  11. 77 FR 73114 - Draft Written Re-Evaluation for Environmental Impact Statement: T.F. Green Airport, Warwick, RI

    Science.gov (United States)

    2012-12-07

    ... England Executive Park, Burlington, MA 01803. FOR FURTHER INFORMATION CONTACT: Richard Doucette, Environmental Program Manager, Federal Aviation Administration New England, 12 New England Executive Park... document will assist the FAA in determining the suitability of the July 2011 EIS and September 2011 Record...

  12. 77 FR 12873 - Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino...

    Science.gov (United States)

    2012-03-02

    ... Proposed Spokane Tribe of Indians West Plains Casino and Mixed Use Project, City of Airway Heights, Spokane... statement with the U.S. Environmental Protection Agency for the Spokane Tribe of Indians West Plains casino... determination by the Secretary of the Interior; and (2) development of a casino-resort facility, parking...

  13. 76 FR 38677 - Draft Environmental Impact Statement for the Proposed Los Coyotes Band of Cahuilla and Cupeño...

    Science.gov (United States)

    2011-07-01

    .... Associated facilities would include food and beverage services, retail space, banquet/meeting space, and administration space. Food and beverage facilities would include two full service restaurants, a drive-in... Rydzik, Chief of the Division of Environmental, Cultural Resources Management and Safety listed in the...

  14. 75 FR 62417 - Draft Environmental Impact Statement for the Proposed Manzanita Band of Kumeyaay Indians Fee-to...

    Science.gov (United States)

    2010-10-08

    ...,000 square feet of food/beverage and retail components; a 38,660-square-foot entertainment venue; and..., Federal review (by the National Indian Gaming Commission) of the development and management contract, and... Division of Environmental, Cultural Resources Management and Safety, at the telephone number provided in...

  15. 78 FR 68859 - Draft Environmental Impact Statement for the Proposed Fee-to-Trust Transfer of Property and...

    Science.gov (United States)

    2013-11-15

    ... Environmental Impact Statement for the Proposed Fee-to- Trust Transfer of Property and Subsequent Development of... Agency regarding the Tribe's application for the conveyance into trust of title to lands located in... announces that the DEIS is now available for public review and that public hearings will be held to receive...

  16. 77 FR 44259 - Notice of Availability of a Final Programmatic Environmental Impact Statement and Draft Record of...

    Science.gov (United States)

    2012-07-27

    ... does not define effects for a specific or planned action. Instead, it analyzes the overall... northern border. For the purposes of the PEIS, CBP defined the northern border as the area between the... addresses concerns about environmental quality and the government's role in protecting it. The essence of...

  17. 77 FR 17037 - Intent To Prepare a Draft Environmental Impact Statement for the Louisiana Coastal Area (LCA...

    Science.gov (United States)

    2012-03-23

    ... Environmental Impact Statement for the Louisiana Coastal Area (LCA)--Louisiana, Mississippi River Hydrodynamic... impact statement (EIS) for the Louisiana Coastal Area (LCA)--Louisiana, Mississippi River Hydrodynamic... tiered off of the November 2004, programmatic EIS for the Louisiana Coastal Area (LCA), Louisiana...

  18. 75 FR 70348 - Notice of Availability of the Draft Environmental Impact Statement for a Proposed Project in...

    Science.gov (United States)

    2010-11-17

    ... Environmental Impact Statement for a Proposed Project in Mariposa County, CA AGENCY: Federal Highway... Restoration Project in Mariposa County, California. DATES: Public circulation of this document will begin on... project on Wednesday, December 8, 2010 between 4 p.m. and 7 p.m. in Mariposa. The location is Mariposa...

  19. 75 FR 49539 - Notice of Availability of the Draft Environmental Impact Statement for the Combined Licenses for...

    Science.gov (United States)

    2010-08-13

    ... contacting Mr. Douglas Bruner by telephone at 1-800-368- 5642, extension 2730, or via e-mail to Levy.COLEIS... may also have an opportunity to speak, if time permits. Mr. Bruner will need to be contacted no later.... FOR FURTHER INFORMATION CONTACT: Mr. Douglas Bruner, Environmental Projects Branch 3, U.S. Nuclear...

  20. 76 FR 39435 - Notice of Intent To Prepare a Draft Environmental Impact Statement and Conduct Public Scoping on...

    Science.gov (United States)

    2011-07-06

    ... establish an ESA Recovery Implementation Program for endangered fish species below Glen Canyon Dam. A... a Recovery Implementation Program for endangered fish species below Glen Canyon Dam. Public... of the River, and the Endangered Species Act (ESA). The National Environmental Policy Act (NEPA...

  1. 75 FR 8047 - Notice of Intent To Prepare a Draft Environmental Impact Statement for the Proposed Duke Energy...

    Science.gov (United States)

    2010-02-23

    ... communities of either Avon, Buxton, Frisco, or Hatteras, NC. Power generated by this project would be supplied... factors. These environmental considerations were combined with wind power, geology and foundation analyses... used in development of future wind power projects. Proposed Impacts to Wetlands and Surface Waters...

  2. 77 FR 29967 - Notice of Intent To Terminate the Existing Draft Environmental Impact Statement and Prepare a New...

    Science.gov (United States)

    2012-05-21

    ... the request following the Ninth Circuit Court's decision in Anderson v. Evans, 371 F.3d 475, that the... to subsequently develop an informed decision; (2) ensure that NEPA reviews provide high quality environmental information via clear and concise documentation; and (3) ensure that the high quality...

  3. 76 FR 34211 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Kennecott Utah Copper...

    Science.gov (United States)

    2011-06-13

    ... Environmental Impact Statement for the Proposed Kennecott Utah Copper LLC Tailings Expansion Project, Near Magna... Copper Tailings Expansion Project, an expansion of an active commercial mining operation near Magna, Salt Lake County, UT. Kennecott Utah Copper LLC (KUC) has applied for a Department of the Army (DA) permit...

  4. 78 FR 44933 - Intent To Prepare a Draft Supplement to the July 2011 Environmental Impact Statement for the...

    Science.gov (United States)

    2013-07-25

    ... and local units of government. The other partnering agencies include: U.S. Environmental Protection... Resources; and the Wilmington Metropolitan Planning Organization. The Merger process provides a forum for... travel lanes between a previously proposed interchange south of the Topsail High School and the...

  5. Draft environmental statement related to the operation of Hope Creek Generating Station (Docket No. 50-354)

    International Nuclear Information System (INIS)

    Wagner, D.H.

    1984-06-01

    This report contains an assessment of the environmental impact associated with the operation of the Hope Creek Generating Station pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for Hope Creek Generating Station, Unit 1

  6. Draft environmental statement related to the Energy Fuels Nuclear, Inc., White Mesa Uranium Project (San Juan County, Utah)

    International Nuclear Information System (INIS)

    1978-12-01

    The proposed action is the issuance of a Source Material License to Energy Fuels Nuclear, Inc., for the construction and operation of the proposed White Mesa Uranium Project (Utah) with a product (U 3 O 8 ) production limited to 7.3 x 10 5 kg (1.6 x 10 6 lb) per year. Possible environmental impacts and adverse effects were identified. Conditions for the protection of the environment are set forth before the license can be issued

  7. Gulf of Alaska/Yakutat Planning Area oil and gas lease sale 158: Draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-12-01

    This environmental impact statement (EIS) addresses a proposed Federal action that will offer for lease areas in the Alaska Outer Continental Shelf (OCS). These areas may contain economically recoverable oil and gas resources. At this time, gas is not considered economically recoverable. Lease Sale 158, proposed for 1997, is comprised of lease blocks in the Gulf of Alaska Planning Area. Up to 977 blocks will be available for lease under the proposed action; only a small percentage is expected to be actually leased. Of the blocks that will be leased, only a portion will be drilled and could possibly result in production. The analytical methods used in this EIS have been formulated over a period of years. The first step of the analysis is the identification of significant environmental and socioeconomic resources through the scoping process outlined in Section I.D. The MMS then derives a range of energy-resource estimates from geologic and economic assumptions and establishes alternatives to the proposed action. The MMS assumes estimated levels of exploration and development activity for analyzing the proposed action. The MMS then analyzes the potential effects expected from the interaction between significant environmental and socioeconomic resources and OCS-related activities

  8. Environmental Survey preliminary report, Idaho National Engineering Laboratory, Idaho Falls, Idaho and Component Development and Integration Facility, Butte, Montana

    International Nuclear Information System (INIS)

    1988-09-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Idaho National Engineering Laboratory (INEL) and Component Development and Integration Facility (CDIF), conducted September 14 through October 2, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the INEL and CDIF. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations' carried on at the INEL and the CDIF, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S ampersand A) Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The S ampersand A Plan will be executed by the Oak Ridge National Laboratory. When completed, the S ampersand A results will be incorporated into the INEL/CDIF Survey findings for inclusion into the Environmental Survey Summary Report. 90 refs., 95 figs., 77 tabs

  9. Environmental Survey preliminary report, Idaho National Engineering Laboratory, Idaho Falls, Idaho and Component Development and Integration Facility, Butte, Montana

    Energy Technology Data Exchange (ETDEWEB)

    1988-09-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Idaho National Engineering Laboratory (INEL) and Component Development and Integration Facility (CDIF), conducted September 14 through October 2, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the INEL and CDIF. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations' carried on at the INEL and the CDIF, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S A) Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The S A Plan will be executed by the Oak Ridge National Laboratory. When completed, the S A results will be incorporated into the INEL/CDIF Survey findings for inclusion into the Environmental Survey Summary Report. 90 refs., 95 figs., 77 tabs.

  10. Environmental interpretation using insoluble residues within reef coral skeletons: problems, pitfalls, and preliminary results

    Science.gov (United States)

    Budd, Ann F.; Mann, Keith O.; Guzmán, Hector M.

    1993-03-01

    Insoluble residue concentrations have been measured within colonies of four massive reef corals from seven localities along the Caribbean coast of Panama to determine if detrital sediments, incorporated within the skeletal lattice during growth, record changes in sedimentation over the past twenty years. Amounts of resuspended sediment have increased to varying degrees at the seven localities over the past decades in response to increased deforestation in nearby terrestrial habitats. Preliminary results of correlation and regression analyses reveal few consistent temporal trends in the insoluble residue concentration. Analyses of variance suggest that amounts of insoluble residues, however, differ among environments within species, but that no consistent pattern of variation exists among species. D. strigosa and P. astreoides possess high concentrations at protected localities, S. siderea at localities with high amounts of resuspended sediment, and M. annularis at the least turbid localities. Little correlation exists between insoluble residue concentration and growth band width within species at each locality. Only in two more efficient suspension feeders ( S. siderea and D. strigosa) do weak negative correlations with growth band width exist overall. These results indicate that insoluble residue concentrations cannot be used unequivocally in environmental interpretation, until more is known about tissue damage, polyp behavior, and their effects on the incorporation of insolubles in the skeleton during growth in different coral species. Insoluble residue data are highly variable; therefore, large sample sizes and strong contrasts between environments are required to reveal significant trends.

  11. A preliminary examination of audience-related communications issues for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.

    1991-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation doses people may have received from exposure to radioactive materials released during past operations at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. The HEDR Project was initiated in response to public concerns about possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to effectively communicate to the many different concerned audiences. Accordingly, the TSP directed PNL to examine methods for communicating causes and effects of uncertainties in the dose estimates. After considering the directive and discussing it with the Communications Subcommittee of the TSP, PNL undertook a broad investigation of communications methods to consider for inclusion in the TSP's current communications program. As part of this investigation, a literature review was conducted regarding risk communications. A key finding was that, in order to successfully communicate risk-related information, a thorough understanding of the knowledge level, concerns and information needs of the intended recipients (i.e., the audience) is necessary. Hence, a preliminary audience analysis was conducted as part of the present research. This report summarizes the results of this analysis. 1 ref., 9 tabs.

  12. Draft Environmental Impact Statement on a proposed nuclear weapons nonproliferation policy concerning foreign research reactor spent nuclear fuel. Volume 1

    International Nuclear Information System (INIS)

    1995-03-01

    The United States Department of Energy and United States Department of State are jointly proposing to adopt a policy to manage spent nuclear fuel from foreign research reactors. Only spent nuclear fuel containing uranium enriched in the United States would be covered by the proposed policy. The purpose of the proposed policy is to promote U.S. nuclear weapons nonproliferation policy objectives, specifically by seeking to reduce highly-enriched uranium from civilian commerce. Environmental effects and policy considerations of three Management Alternative approaches for implementation of the proposed policy are assessed. The three Management Alternatives analyzed are: (1) acceptance and management of the spent nuclear fuel by the Department of Energy in the United States, (2) management of the spent nuclear fuel at one or more foreign facilities (under conditions that satisfy United States nuclear weapons nonproliferation policy objectives), and (3) a combination of components of Management Alternatives 1 and 2 (Hybrid Alternative). A No Action Alternative is also analyzed. For each Management Alternative, there are a number of alternatives for its implementation. For Management Alternative 1, this document addresses the environmental effects of various implementation alternatives such as varied policy durations, management of various quantities of spent nuclear fuel, and differing financing arrangements. Environmental impacts at various potential ports of entry, along truck and rail transportation routes, at candidate management sites, and for alternate storage technologies are also examined. For Management Alternative 2, this document addresses two subalternatives: (1) assisting foreign nations with storage; and (2) assisting foreign nations with reprocessing of the spent nuclear fuel. Management Alternative 3 analyzes a hybrid alternative. This document is Vol. 1 of 2 plus summary volume

  13. Environmental Resources of Selected Areas of Hawaii: Groundwater in the Puna District of the Island of Hawaii (DRAFT)

    Energy Technology Data Exchange (ETDEWEB)

    Staub, W.P.

    1994-06-01

    This report has been prepared to make available and archive the background scientific data and related information collected on groundwater during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The U.S. Department of Energy (DOE) published a notice in the Federal Register on May 17,1994 (Fed Regis. 5925638), withdrawing its notice of intent (Fed. Regis. 575433) of February 14,1992, to prepare the HGP-EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. The background scientific data and related information presented in this report were collected for the geothermal resource subzones in the Puna District on the island of Hawaii. The scientific background data and related information is being made available for use by others in conducting future scientific research in these areas. This report describes the environmental resources present in the areas studied (i.e., the affected environment) and does not represent an assessment of environmental impacts. This paper summarizes the current state of knowledge with respect to groundwater in the Puna District of the island of Hawaii (hereinafter referred to as Hawaii). Groundwater quality inside and outside the lower east rift zone (LERZ) of Kilauea is compared with that of meteoric water, seawater, and geothermal fluid. The degree of mixing between meteoric water, sea water, and geothermal water in and adjacent to the LERZ also is discussed. Finally, groundwater pathways and use in the Puna District are discussed. Most of the information contained herein is compiled from recent U.S. Geological Survey publications and open-file reports.

  14. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

    International Nuclear Information System (INIS)

    2003-01-01

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF 6 conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (DandD) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products

  15. Draft Environmental Statement related to the operation of Seabrook Station, Units 1 and 2. Docket Nos. 50-443 and 50-444, Public Service Company of New Hampshire, et al

    International Nuclear Information System (INIS)

    1982-05-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Seabrook Station, Units 1 and 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR 51, as amended, of the NRC regulations. This statement examines: the effected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic-ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Seabrook Station, Units 1 and 2

  16. Technical procedures for utilities and solid waste: Environmental Field Program, Deaf Smith County site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    The evaluation of environmental issues and concerns and the addressing of statutory requirements are fundamental parts in the characterization of the site in Deaf Smith County, Texas for the US Department of Energy's Salt Repository Project (SRP). To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Utilities and Solid Waste considerations. This technical procedure (TP) has been developed to implement the field program described in the Utilities and Solid Waste Site Study Plan. The purpose and scope of the Utilities and Solid Waste Technical Procedure is to develop and implement a data collection procedure to fulfill the data base needs of the Utilities and Solid Waste SSP. The procedure describes a method of obtaining, assessing and verifying the capabilities of the regional service utilities and disposal contractors. This data base can be used to identify a preferred service source for the engineering contractor. The technical procedure was produced under the guidelines established in Technical Administrative Procedure No. 1.0, Preparation, Review and Approval of Technical Procedures

  17. Federal environmental standards of potential importance to operations and activities at US Department of Energy sites. Draft

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, K.M.; Bilyard, G.R.; Davidson, S.A.; Jonas, R.J.; Joseph, J.

    1993-06-01

    The US Department of Energy (DOE) is now engaged in a program of environmental restoration nationwide across its 45 sites. It is also bringing its facilities into compliance with environmental regulations, decontaminating and decommissioning unwanted facilities, and constructing new waste management facilities. One of the most difficult questions that DOE must face in successfully remediating its inactive waste sites, decontaminating and decommissioning its inactive facilities, and operating its waste management facilities is: ``What criteria and standards should be met?`` Acceptable standards or procedures for determining standards will assist DOE in its conduct of ongoing waste management and pending cleanup activities by helping to ensure that those activities are conducted in compliance with applicable laws and regulations and are accepted by the regulatory community and the public. This document reports on the second of three baseline activities that are being conducted as prerequisites to either the development of quantitative standards that could be used by DOE, or consistent procedures for developing such standards. The first and third baseline activities are also briefly discussed in conjunction with the second of the three activities.

  18. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    The US Department of Energy (DOE) is engaged in two related decision making processes concerning: (1) the transportation, receipt, processing, and storage of spent nuclear fuel (SNF) at the DOE Idaho National Engineering Laboratory (INEL) which will focus on the next 10 years; and (2) programmatic decisions on future spent nuclear fuel management which will emphasize the next 40 years. DOE is analyzing the environmental consequences of these spent nuclear fuel management actions in this two-volume Environmental Impact Statement (EIS). Volume 1 supports broad programmatic decisions that will have applicability across the DOE complex and describes in detail the purpose and need for this DOE action. Volume 2 is specific to actions at the INEL. This document, which limits its discussion to the Savannah River Site (SRS) spent nuclear fuel management program, supports Volume 1 of the EIS. Following the introduction, Chapter 2 contains background information related to the SRS and the framework of environmental regulations pertinent to spent nuclear fuel management. Chapter 3 identifies spent nuclear fuel management alternatives that DOE could implement at the SRS, and summarizes their potential environmental consequences. Chapter 4 describes the existing environmental resources of the SRS that spent nuclear fuel activities could affect. Chapter 5 analyzes in detail the environmental consequences of each spent nuclear fuel management alternative and describes cumulative impacts. The chapter also contains information on unavoidable adverse impacts, commitment of resources, short-term use of the environment and mitigation measures

  19. ERG and GRG review of the draft of ''preliminary test plan for in situ testing from an exploratory shaft in salt - October 1983''

    International Nuclear Information System (INIS)

    Kalia, H.N.

    1986-03-01

    The Engineering Review Group (ERG) and Geologic Review Group (GRG) were established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate engineering- and geologic-related issues in the US Department of Energy's nuclear waste repository program. The January 1984 meeting of the ERG and GRG reviewed the In Situ Test Plan (ISTP) titled ''Preliminary Test Plan for In Situ Testing From an Exploratory Shaft in Salt - October 1983.'' This report documents the ERG's and GRG's comments and recommendations on this subject and the ONWI responses to the specific points raised by the ERG and GRG. 6 refs., 2 figs., 1 tab

  20. Preliminary magnetostratigraphy and environmental magnetism of the Lower Cretaceous from the Italian Dolomites

    Science.gov (United States)

    Savian, J. F.; Jovane, L.; Florindo, F.; Lukeneder, A.

    2011-12-01

    The Lower Cretaceous (~146 to 100 Ma) represents an enigmatic time interval for paleoclimatic, paleogeography and paleomagnetic evolution of the Earth's history. The climatic changes include global oceanic anoxic events (OAEs), biotic changes, global excursions of carbon and strontium isotopes, rises in eustatic sea level and paleotemperature. Paleoceanography was marked by a rapid rate of ocean spreading in the Atlantic. The opening of the Atlantic Ocean was wide enough to allow significant circulation of masses of waters across the equator. This period is furthermore important for the oceanographic events occurring at the base of the Aptian (Selli Level). This period also present one of the most intriguing geomagnetic events: the long normal Cretaceous superchron, lasted for almost 40 million years. We study here the lower Cretaceous deposits of the Puez section in the Dolomites (northern Italy) which represents a continuous section during this period. The samples collected represent marine sedimentary materials of the Biancone and Puez formations. The Puez section consists essentially of green-grey to red limestones and calcareous marls. We present preliminary results of integrated magnetostratigraphic analysis, including a detailed lithostratigraphy and environmental magnetism. We recognize magnetic behavior that are relative to normal polarity (the normal Cretaceous superchron), with a short reverse interval that might represent the M-1r event. We also recognize a series of normal and reverse polarities (below the normal Cretaceous superchron) which can be referred to the magnetozones M1/M5. The environmental magnetic data consists of magnetic susceptibility (χ), natural remanent magnetization (NRM), anhysteretic remanent magnetization (ARM), isothermal remanent magnetization (IRM) at 900 mT and backfield isothermal remanent magnetization (BIRM) at 100 mT and 300 mT. Derived parameters, such as S-ratio (S300=BIRM300/IRM900) and hard isothermal remanent

  1. 75 FR 26270 - Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning...

    Science.gov (United States)

    2010-05-11

    ...] Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning and Historic... draft Environmental Planning and Historic Preservation Compliance Costs policy and a draft Environmental Planning and Historic Preservation Mitigation policy. DATES: Comments must be received by June 10, 2010...

  2. Draft site-wide environmental impact statement for Sandia National Laboratories/New Mexico. Volume 1: Chapters 1-15

    International Nuclear Information System (INIS)

    1999-04-01

    The DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. In the No Action Alternative, the DOE would continue the historical mission support activities SNL/NM has conducted at planned operational levels. In the Expanded Operations Alternative, the DOE would operate SNL/NM at the highest reasonable levels of activity currently foreseeable. Under the Reduced Operations Alternative, the DOE would operate SNL/NM at the minimum levels of activity necessary to maintain the capabilities to support the DOE mission in the near term. Under all of the alternatives, the affected environment is primarily within 50 miles (80 kilometers) of SNL/NM. Analyses indicate little difference in the environmental impacts among alternatives

  3. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites Slick Rock, Colorado. Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VP) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the groundwater from further degradation. Remedial actions at the Slick Rock sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC).

  4. Contribution to draft generic environmental impact statement on commercial waste management: radioactive waste isolation in geologic formations

    International Nuclear Information System (INIS)

    1978-04-01

    This document concentrates on deep geologic isolation of wastes in bedded salt, granite, shale, and basalt with emphasis on wastes from three fuel cycles: reprocessing wastes from uranium and plutonium recycling, reprocessing wastes from uranium-only recycling, and spent unreprocessed fuel with no recycling. The analyses presented in this document are based on preconceptual repository designs. As the repository designs progress through future phases, refinements will occur which might modify some of these results. The 12 sections in the report are: introduction; selection and description of generic repository sites; LWR wastes to be isolated in geologic formations; description of waste isolation facilities; effluents from the waste isolation facility; assessment of environment impacts for various geographical locations of a waste isolation facility; environmental monitoring; decommissioning; mine decommissioning site restoration; deep geologic alternative actions; potential mechanisms of containment failure; and considerations relevant to provisional versus final storage

  5. Draft site-wide environmental impact statement for Sandia National Laboratories/New Mexico. Volume 2: Appendixes

    International Nuclear Information System (INIS)

    1999-04-01

    The DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. In the No Action Alternative, the DOE would continue the historical mission support activities SNL/NM has conducted at planned operational levels. In the Expanded Operations Alternative, the DOE would operate SNL/NM at the highest reasonable levels of activity currently foreseeable. Under the Reduced Operations Alternative, the DOE would operate SNL/NM at the minimum levels of activity necessary to maintain the capabilities to support the DOE mission in the near term. Under all of the alternatives, the affected environment is primarily within 50 miles (80 kilometers) of SNL/NM. Analyses indicate little difference in the environmental impacts among alternatives. This volume contains Appendices A--H

  6. Technical procedures for water resources: Volume 3, Environmental Field Program, Deaf Smith County Site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Water Resources (ONWI, 1987). This technical procedure (TP) has been developed to implement the field program described in the Water Resources Site Study Plan. This procedure provides the general method for the field collection of water and sediment samples from playa lakes using an Alpha horizontal type sampler or equivalent or a peristaltic pump for water and a KB-coring devise or ponar grab for sediments. The samples will be preserved and then shipped to a laboratory for analysis. The water quality and sediment samples will be collected as part of the surface-water quality field study described in the Site Plan for Water Resources. 15 refs., 5 figs., 3 tabs

  7. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

  8. Environmental Impact Analysis Process. Volume 1. Preliminary Draft Environmental Impact Statement Construction and Operation of Space Launch Complex 7, Vandenberg Air Force Base, California

    Science.gov (United States)

    1989-04-06

    Unavoidable Adverse Effe 4-165 4.17.1 Significant Unavoidable Advene Effec 4-165 4.17.1.1 Geology Md Sols 4-165 4.17.1.2 Wanr Use 4-165 4.17.1.3 Vegmadon...includes Pismo Beach and Guadalupe Dunes to Oceano in San Luis Obispo I I 3-37 K County, east of Casmalia, Surf, Point Arguello, and Point Conception...May to July. It is known from the Cypress Ridge area to near I 1 3-39 Oceano in San Luis Obispo County (C. Smith 1976; D. Smith 1983). This plant

  9. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    This volume contains the following attachments: transportation of Naval spent nuclear fuel; description of Naval spent nuclear receipt and handling at the Expended Core Facility at the Idaho National Engineering Laboratory; comparison of storage in new water pools versus dry container storage; description of storage of Naval spent nuclear fuel at servicing locations; description of receipt, handling, and examination of Naval spent nuclear fuel at alternate DOE facilities; analysis of normal operations and accident conditions; and comparison of the Naval spent nuclear fuel storage environmental assessment and this environmental impact statement

  10. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  11. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  12. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  13. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs, Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    Volume 1 to the Department of Energy's Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Management Programs Environmental Impact Statement evaluates a range of alternatives for managing naval spent nuclear fuel expected to be removed from US Navy nuclear-powered vessels and prototype reactors through the year 2035. The Environmental Impact Statement (EIS) considers a range of alternatives for examining and storing naval spent nuclear fuel, including alternatives that terminate examination and involve storage close to the refueling or defueling site. The EIS covers the potential environmental impacts of each alternative, as well as cost impacts and impacts to the Naval Nuclear Propulsion Program mission. This Appendix covers aspects of the alternatives that involve managing naval spent nuclear fuel at four naval shipyards and the Naval Nuclear Propulsion Program Kesselring Site in West Milton, New York. This Appendix also covers the impacts of alternatives that involve examining naval spent nuclear fuel at the Expended Core Facility in Idaho and the potential impacts of constructing and operating an inspection facility at any of the Department of Energy (DOE) facilities considered in the EIS. This Appendix also considers the impacts of the alternative involving limited spent nuclear fuel examinations at Puget Sound Naval Shipyard. This Appendix does not address the impacts associated with storing naval spent nuclear fuel after it has been inspected and transferred to DOE facilities. These impacts are addressed in separate appendices for each DOE site

  14. Preliminary studies on environmental pollutants in chamois and wild boar from Eastern Piedmont, Italy.

    Directory of Open Access Journals (Sweden)

    Federica Ceriani

    2018-06-01

    Full Text Available Organochlorine pesticides (OCPs and polychlorinated biphenyls (PCBs are synthetic chlorinated compounds classified as POPs whereas only the penta e tetra-brominated polybromodiphenyl ethers (PBDEs are so defined by the Stockolm Convention (Stockholm Convention, 2005 in order to elimitate or restrict the use of POPs. Organophosphorus insecticides (OCPs represent important environmental and food contamination sources, widely used in agriculture. Among polyciclic aromatic hydrocarbons (PAHs, benzo[a]pirene is classified by IARC in Group 1, as cancerogen  and Benzo[a]fluoranthene as a Group 2B, as possible cancerogen (IARC, 2012; IARC, 2010.  EFSA (European Food Safety Authority has released a scientific opinion on the risks to public health related to the presence of brominated flame retardants in food (EFSA, 2011 and in 2014 European commission has asked Member States to monitor the presence of brominated flame retardants (BFRs in food over the next two years (EC, 2014. Due to their heir n-octanol/water partition coefficient (log Kow, they accumulate in fat tissue, bioconcentrate and biomagnify in the animals at the higher trophic levels, possibly causing, through chronic exposure, endocrine disruption and cancer (Wania et al., 1995; Vallack et al., 1998. The aim of this study is to evaluate the presence of OCPs, PCBs, PBDEs and PAHs in chamois and wild boar from Eastern Piedmont, Italy. A total of 20 chamois and 20 wild boar muscle samples were collected during the hunting season 2017, from Verbania Cusio Ossola (VCO (Fig 1. The chemical analysis for the detection of OCPs, PCBs, PBDEs, and PAHs   was performed by GC-MS/MS on muscle samples purified and extracted using a QuEChERS technique, validated according to SANTE 2017 (SANTE/11183/2017. These preliminary results show the ubiquitary presence of the studied contaminants. PCBs have been found more in chamois (45% than in wild boar (35%. No PBDEs were detected in wild boar but in chamois

  15. Basic Drafting. Revised.

    Science.gov (United States)

    Schertz, Karen

    This introductory module on drafting includes the technical content and tasks necessary for a student to be employed in an entry-level drafting occupation. The module contains 18 instructional units that cover the following topics: introduction to drafting; tools and equipment; supplies and materials; sketching; scales; drawing format; lettering;…

  16. General Drafting. Technical Manual.

    Science.gov (United States)

    Department of the Army, Washington, DC.

    The manual provides instructional guidance and reference material in the principles and procedures of general drafting and constitutes the primary study text for personnel in drafting as a military occupational specialty. Included is information on drafting equipment and its use; line weights, conventions and formats; lettering; engineering charts…

  17. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes

  18. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes

  19. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  20. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes