WorldWideScience

Sample records for pregnant dams received

  1. Anaemia and associated risk factors among pregnant women in Gilgel Gibe dam area, Southwest Ethiopia

    Directory of Open Access Journals (Sweden)

    Getachew Million

    2012-12-01

    Full Text Available Abstract Background Anaemia is known to be one of the outcomes of parasitic infection and it may result in impaired cognitive development, reduced physical work capacity and in severe cases increased risk of mortality, particularly during the prenatal period. The aim of this study was to determine the prevalence and associated risk factors of anaemia among pregnant women in Gilgel-Gibe dam area, southwestern Ethiopia. Methods A cross-sectional community based study was conducted on 388 pregnant women living in three districts around Gilgel Gibe Dam area, southwestern Ethiopia. Socio-demographic and socio-economic data were collected from each participant. A single stool sample was also collected from each selected pregnant woman. Haemoglobin concentration was determined by the cyanmethemoglobin method. Plasmodium infection prevalence and intensity were assessed with thin and thick blood film examination. Results Of the total 388 study participants, 209 (53.9% were anaemic. Pregnant woman who were rural residents (Adjusted odds ratio (AOR = 1.62, 95% C.I: 1.02-2.62, P= 0.042, not using insecticide treated nets (ITNs during the study period (AOR = 2.84, 95% C.I: 1.33-6.05, p = 0.007, those who were Plasmodium malaria infected (AOR = 11.19, 95% C.I: 3.31-37.7, p= 0.01 and those with Soil Transmitted Helminth (STH infections (AOR=1.82, 95% C.I: 1.16-2.87, p=0.001 had higher odds of being anaemic than those who were urban residents, using ITNs, free of Plasmodium malaria and Soil transmitted helminth infection, respectively. There was a significant correlation between increasing hookworm parasite load (r = −.110, PAscaris lumbricoides (r = −.122, P Trichuris trichiura (r = −.025, P Conclusion The high prevalence of anaemia indicates it is currently a serious health problem of pregnant women living in Gilgel Gibe Dam area. Plasmodium malaria and soil transmitted helminth infections were significantly associated with anaemia. Antenatal care

  2. Dams

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset �is generated from from the Vermont Dam Inventory (VDI). The VDI is managed by the VT DEC's Dam Safety and Hydrology Section and contains information...

  3. Hypertensive Disorders in Pregnant Women Receiving Fertility Treatments

    Directory of Open Access Journals (Sweden)

    Maryam Barekat

    2018-05-01

    Full Text Available Hypertensive disorders (HDs as the most prevalent medical problem during pregnancy, predispose the patient to a lot of comorbidities and may even cause maternal or fetal death. The rate of infertility has been increasing in recent decades. So, we collected and summarized data about the co-existence of these two entities and found that HDs are somewhat more common in women receiving fertility treatments regardless of pathophysiologic correlation of infer- tility and hypertension or older age and chance of multiple pregnancies.

  4. Triclosan exposure reduces thyroxine levels in pregnant and lactating rat dams and in directly exposed offspring

    DEFF Research Database (Denmark)

    Petersen, Marta Axelstad; Boberg, Julie; Vinggaard, Anne Marie

    2013-01-01

    Thyroid disrupting chemicals can potentially disrupt brain development. Two studies investigating the effect of the antibacterial compound triclosan on thyroxine (T4) levels in rats are reported. In the first, Wistar rat dams were gavaged with 75, 150 or 300 mg triclosan/kg bw/day throughout gest...

  5. Are pregnant women receiving support for smoking dependence when attending routine antenatal appointments?

    LENUS (Irish Health Repository)

    Cully, G

    2010-09-01

    Early and consistent intervention with pregnant smokers can reduce the incidence of adverse pregnancy outcomes associated with smoking during pregnancy. A survey of 470 pregnant women was conducted to establish the care they received in relation to smoking whilst attending routine public antenatal appointments. The overall prevalence of smoking was 23.5%. Age, level of education and nationality were associated with smoking status with younger, less educated Irish women being most likely to smoke. Women attending for their first visit were much more likely to be asked about their smoking status 71 (85.5) versus 68 (17.8) and advised to quit if they were smokers 11 (73.3) versus 11 (15.7). None of the women were offered specific assistance to help them stop smoking or had a follow-up appointment arranged specifically to do with smoking. 167 women (35.6) were exposed to passive smoking in their own homes.

  6. Dam! Dam! Dam!

    International Nuclear Information System (INIS)

    McCully, P.

    1997-01-01

    The author of ''Silenced Rivers'' a book questioning the desirability of dam building and hydroelectric power generation argues the main themes of his book in this paper. Despite being hailed by politicians as good solutions to power generation problems, and enthusiastically pursued in China, the U.S.A., the former Soviet Union, India and Japan, dams have far-reaching ecological and human consequences. The ecosystems lost to flooding, and the agricultural land use lost, the human cost in terms of homes and employment lost to reservoirs, disease from water-borne infections such as malaria, and the hazards of dams overflowing or breaking are all factors which are against the case for dam construction. The author argues the hydroelectric power may be renewable, but the social, agricultural and ecological costs are too high to justify it as a method of first choice. (UK)

  7. Prioritizing Pregnant Women’s Preferences to Receive Health Information Before and During Pregnancy in Semnan in 2014 - 2015

    Directory of Open Access Journals (Sweden)

    Kahouei

    2016-01-01

    Full Text Available Background Given that family health is tied to women health, illness, or death of a woman has an adverse effect on the health of her child, family, and community; awareness of women’s preferences in receiving health information can help to improve and modify the methods of informing and providing appropriate services to them, and also makes pregnant women training more efficient and more effective. Objectives The aim of this study is to prioritize the preferences of women before and during pregnancy on receiving health information. Patients and Methods This descriptive study was performed on pregnant women who had referred to health care centers affiliated to Semnan University of Medical Sciences, Iran in 2014. An anonymous self-administered questionnaire was developed. Results The results showed that 17.5% (n = 35 of the participants reported their information needs about physical health to become pregnant, 36% (n = 72 psychological readiness for pregnancy and 57.5% (n = 115 domestic violence and its impact on the health of the mother and fetus. Number of previous delivery had a negative and significant relationship with the pregnant women’s preferences (B = - 1.31, P < 0.001. Conclusions It is concluded that the most of pregnant women are oblivious to their health for getting pregnant and some of them experience symptoms of mental disorders in reproductive age. The findings show that domestic violence is a hidden and persistent epidemic among the pregnant women. Women, who had more previous delivery, needed this information less.

  8. Disparities in unmet dental need and dental care received by pregnant women in Maryland.

    Science.gov (United States)

    Singhal, Astha; Chattopadhyay, Amit; Garcia, A Isabel; Adams, Amy B; Cheng, Diana

    2014-09-01

    To examine prenatal dental care needs, utilization and oral health counseling among Maryland women who delivered a live infant during 2001-2003 and identify the factors associated with having a dental visit and having an unmet dental need during pregnancy. Pregnancy Risk Assessment Monitoring System is an ongoing population based surveillance system that collects information of women's attitudes and experiences before, during, and shortly after pregnancy. Logistic regression was used to model dental visits and unmet dental need using predictor variables for Maryland 2001-2003 births. Less than half of all women reported having a dental visit and receiving oral health advice during pregnancy. Twenty-five percent of women reported a need for dental care, of which 33 % did not receive dental care despite their perceived need. Multivariate modeling revealed that racial minorities, women who were not married and those with annual income dental visit. Women who were not married, had low annual income, were older than 40 years of age, had an unintended pregnancy and received prenatal care later than desired were most likely to have an unmet dental need during pregnancy. Despite reported needs and existing recommendations to include oral health as a component of prenatal care, less than half of pregnant women have a dental visit during their pregnancy. One-third of women with a dental problem did not have a dental visit highlighting the unmet need for dental care during pregnancy.

  9. Prevalence Soil Transmitted Helminthiasis and malaria co-infection among pregnant women and risk factors in Gilgel Gibe dam Area, Southwest Ethiopia

    Science.gov (United States)

    2013-01-01

    Background Malaria and Soil Transmitted Helminthiasis (STH) are co-endemic and major public health problems in Ethiopia. The aim of the study was to assess the prevalence of malaria and STHs co-infection and to determine the association risk factors. Methods A cross-sectional community based study was conducted on 388 pregnant women living in three districts around Gilgel Gibe Dam area, southwestern Ethiopia. Socio-demographic and socio-economic data, single stool sample and blood sample were collected from each participant. Results The prevalence of STH and malaria was 159 (41%) and 45 (11.6%), respectively and the prevalence of STHs/malaria co-infection was 30 (7.7%). Hookworm was the most prevalent 114 (29.4%) soil transmitted helminthiasis infection followed by Ascaris lumbricoides (A. lumbricoides) 58 (15%) and Trichuris trichiura (T. trichiura) 13 (3.4%). Habit of eating soil (Adjusted Odds Ratio (AOR) = 4.64, 95% CI: 1.50-14.36, P=0.008), presence of stagnant water near study participants’ house (AOR=2.99, 95% CI: 1.28-6.99, P=0.012) and habit of using human feces as a fertilizer (AOR= 5.34, 95% CI: 1.99-14.28, P<0.001) were found to be significantly associated with malaria and STH co-infection among the pregnant women. Hookworm parasitic load was positively correlated with malaria parasitic load (r = 0.299, P<0.001) while A. lumbricoides parasitic load was negatively correlated with malaria parasitic load (r = −0.095, P<0.001). Conclusion Intestinal parasite and/or malaria co-infection is a health problem among pregnant women living around Gilgel Gibe dam area. Therefore, intervention including improving sanitation, removing stagnant water, and health education to the pregnant women should be given. PMID:23837685

  10. Prevalence soil transmitted helminthiasis and malaria co-infection among pregnant women and risk factors in Gilgel Gibe Dam area, southwest Ethiopia.

    Science.gov (United States)

    Getachew, Million; Tafess, Ketema; Zeynudin, Ahmed; Yewhalaw, Delenesaw

    2013-07-09

    Malaria and Soil Transmitted Helminthiasis (STH) are co-endemic and major public health problems in Ethiopia. The aim of the study was to assess the prevalence of malaria and STHs co-infection and to determine the association risk factors. A cross-sectional community based study was conducted on 388 pregnant women living in three districts around Gilgel Gibe Dam area, southwestern Ethiopia. Socio-demographic and socio-economic data, single stool sample and blood sample were collected from each participant. The prevalence of STH and malaria was 159 (41%) and 45 (11.6%), respectively and the prevalence of STHs/malaria co-infection was 30 (7.7%). Hookworm was the most prevalent 114 (29.4%) soil transmitted helminthiasis infection followed by Ascaris lumbricoides (A. lumbricoides) 58 (15%) and Trichuris trichiura (T. trichiura) 13 (3.4%). Habit of eating soil (Adjusted Odds Ratio (AOR) = 4.64, 95% CI: 1.50-14.36, P=0.008), presence of stagnant water near study participants' house (AOR=2.99, 95% CI: 1.28-6.99, P=0.012) and habit of using human feces as a fertilizer (AOR= 5.34, 95% CI: 1.99-14.28, P<0.001) were found to be significantly associated with malaria and STH co-infection among the pregnant women. Hookworm parasitic load was positively correlated with malaria parasitic load (r = 0.299, P<0.001) while A. lumbricoides parasitic load was negatively correlated with malaria parasitic load (r = -0.095, P<0.001). Intestinal parasite and/or malaria co-infection is a health problem among pregnant women living around Gilgel Gibe dam area. Therefore, intervention including improving sanitation, removing stagnant water, and health education to the pregnant women should be given.

  11. Pneumocystis Pneumonia in Non-HIV Pregnant Women Receiving Chemotherapy for Malignant Lymphoma: Two Case Reports

    Directory of Open Access Journals (Sweden)

    Yuki Fukutani

    2017-01-01

    Full Text Available Pneumocystis pneumonia (PCP is a life-threatening opportunistic infection that sometimes occurs in immunocompromised patients with human immunodeficiency virus (HIV. Here, we report two extremely rare cases of PCP in non-HIV pregnant women who underwent chemotherapy for malignant lymphoma. Case  1 is a 34-year-old primigravida who was diagnosed with Hodgkin’s lymphoma. She received ABVD chemotherapy and developed PCP at 37 weeks of gestation. After the onset of PCP, emergent cesarean section was performed due to a nonreassuring fetal status. Case  2 is a 31-year-old multigravida with diffuse large B-cell lymphoma who was administered R-CHOP chemotherapy. At 34 weeks of gestation, she complained of dyspnea and developed PCP. She delivered her baby vaginally immediately after the onset of symptoms. Both patients were treated with sulfamethoxazole-trimethoprim (ST and recovered shortly thereafter. The babies’ courses were also uneventful. PCP remains a serious cause of death, especially in non-HIV patients, and, therefore, appropriate prophylaxis and a prompt diagnosis are imperative.

  12. Prioritizing Pregnant Women’s Preferences to Receive Health Information Before and During Pregnancy in Semnan in 2014 - 2015

    OpenAIRE

    Kahouei; Ansari Niaki; Homayoon; Razavi

    2016-01-01

    Background Given that family health is tied to women health, illness, or death of a woman has an adverse effect on the health of her child, family, and community; awareness of women’s preferences in receiving health information can help to improve and modify the methods of informing and providing appropriate services to them, and also makes pregnant women training more efficient and more effective. Objectives The aim of this study...

  13. Malaria prevalence in pregnant women receiving antenatal care at the health centre of University of Uyo, Nigeria

    Directory of Open Access Journals (Sweden)

    Peace Edwin Ubulom

    2017-10-01

    Full Text Available Objective: To assess the prevalence of malaria among pregnant women receiving antenatal care at the health centre of the town campus of University of Uyo, Nigeria. Methods: A total of 1 171 pregnant women participated in the present study. Structured questionnaire was administered to obtain relevant demographic and clinical characteristics of the participants. Thin blood films were obtained and examined for malaria parasites. Data obtained were analyzed using the statistical software SPSS version 20. Results: The results obtained showed that out of the 1 171 pregnant women, 61 (5.21% were positive for malaria infection. The month of July recorded the highest prevalence [19.70% (12 cases], while February, April and June had the lowest prevalence [11.50% (7 cases each]. Results obtained from Chi-square test indicated that the difference in the prevalence of malaria in relation to age was statistically significant (χ2cal = 16.616, χ2tab = 7.815, P 0.05. Conclusions: The prevalence rate of malaria infection among pregnant women was low in the present study. However, malaria in pregnancy still remains a health-care concern in our communities.

  14. Evaluation of the vaginal flora in pregnant women receiving opioid maintenance therapy: a matched case-control study.

    Science.gov (United States)

    Farr, Alex; Kiss, Herbert; Hagmann, Michael; Holzer, Iris; Kueronya, Verena; Husslein, Peter W; Petricevic, Ljubomir

    2016-08-05

    Vaginal infections are a risk factor for preterm delivery. In this study, we sought to evaluate the vaginal flora of pregnant women receiving opioid maintenance therapy (OMT) in comparison to non-dependent, non-maintained controls. A total of 3763 women with singleton pregnancies who underwent routine screening for asymptomatic vaginal infections between 10 + 0 and 16 + 0 gestational weeks were examined. Vaginal smears were Gram-stained, and microscopically evaluated for bacterial vaginosis, candidiasis, and trichomoniasis. In a retrospective manner, data of 132 women receiving OMT (cases) were matched for age, ethnicity, parity, education, previous preterm delivery, and smoking status to the data of 3631 controls. The vaginal flora at antenatal screening served as the primary outcome measure. Secondary outcome measures were gestational age and birth weight. In the OMT group, 62/132 (47 %) pregnant women received methadone, 39/132 (29.5 %) buprenorphine, and 31/132 (23.5 %) slow-release oral morphine. Normal or intermediate flora was found in 72/132 OMT women (54.5 %) and 2865/3631 controls [78.9 %; OR 0.49 (95 % CI, 0.33-0.71); p Candidiasis occurred more frequently in OMT women than in controls [OR 2.11 (95 % CI, 1.26-3.27); p candidiasis) and trichomoniasis. Compared to infants of the control group, those of women with OMT had a lower mean birth weight [MD -165.3 g (95 % CI, -283.6 to -46.9); p = 0.006]. Pregnant women with OMT are at risk for asymptomatic vaginal infections. As recurrent candidiasis is associated with preterm delivery, the vulnerability of this patient population should lead to consequent antenatal infection screening at early gestation.

  15. Detection of HIV drug resistance mutations in pregnant women receiving single dose Nevirapine in south India

    Directory of Open Access Journals (Sweden)

    Mini S Jacob

    2011-01-01

    Full Text Available Background: Single dose of Nevirapine to prevent mother to child transmission of HIV is the commonest preventive regimen in resource-limited countries. Objectives: The objective of this study was to detect drug-resistant virus after single dose of Nevirapine (sdNVP provided to delivering HIV seropositive (HIV+ve women and to evaluate the time taken for its decay. Results: Of the 36 consenting HIV+ve pregnant women enrolled into the study, the mean hemoglobin and total lymphocyte counts were 10.8 g/dl and 1843 cells/mm 3 , respectively. Mean CD4 counts in 64% of women was 363 cells/mm 3 and mean viral load for 16/36 women was 28,143 copies/ml of plasma. Nevirapine-resistance mutations were detected in 28% of women at delivery; using OLA (Oligonucleotide Ligation Assay. K103N mutations were seen in 19.4% of women while the Y181C mutation was seen in 5%. Both the mutations were detected in 2.7% of women. Sequential blood samples collected at delivery, 7-10 days, 6 weeks, 4 months, 6 months and one year postpartum showed that 81% of K103N mutations and 66.7% of Y181C mutations were detected at 6 weeks postpartum . Wild-type virus had replaced the mutants by one year postpartum in all women except one. Conclusion : These observations are relevant for future treatment with antiretroviral therapy in these women for their HIV disease.

  16. Renal structure and function evaluation of rats from dams that received increased sodium intake during pregnancy and lactation submitted or not to 5/6 nephrectomy.

    Science.gov (United States)

    Marin, Evelyn Cristina Santana; Balbi, Ana Paula Coelho; Francescato, Heloísa Della Coletta; Alves da Silva, Cleonice Giovanini; Costa, Roberto Silva; Coimbra, Terezila M

    2008-01-01

    Adult rats submitted to perinatal salt overload presented renin-angiotensin system (RAS) functional disturbances. The RAS contributes to the renal development and renal damage in a 5/6 nephrectomy model. The aim of the present study was to analyze the renal structure and function of offspring from dams that received a high-salt intake during pregnancy and lactation. We also evaluated the influence of the prenatal high-salt intake on the evolution of 5/6 nephrectomy in adult rats. A total of 111 sixty-day-old rat pups from dams that received saline or water during pregnancy and lactation were submitted to 5/6 nephrectomy (nephrectomized) or to a sham operation (sham). The animals were killed 120 days after surgery, and the kidneys were removed for immunohistochemical and histological analysis. Systolic blood pressure (SBP), albuminuria, and glomerular filtration rate (GFR) were evaluated. Increased SBP, albuminuria, and decreased GFR were observed in the rats from dams submitted to high-sodium intake before surgery. However, there was no difference in these parameters between the groups after the 5/6 nephrectomy. The scores for tubulointerstitial lesions and glomerulosclerosis were higher in the rats from the sham saline group compared to the same age control rats, but there was no difference in the histological findings between the groups of nephrectomized rats. In conclusion, our data showed that the high-salt intake during pregnancy and lactation in rats leads to structural changes in the kidney of adult offspring. However, the progression of the renal lesions after 5/6 nephrectomy was similar in both groups.

  17. Adverse effects of melatonin on rat pups of Wistar-Kyoto dams receiving melatonin supplementation during pregnancy.

    Science.gov (United States)

    Singh, Harbindar Jeet; Keah, Lee Siew; Kumar, Arun; Sirajudeen, K N S

    2012-11-01

    This report documents an incidental finding during a study investigating the effects of melatonin supplementation on the development of blood pressure in SHR. Administration of 10 mg/kg/day of melatonin in drinking water during pregnancy to Wistar-Kyoto (WKY) dams caused a loss of more than 50% of the pups by the age of three weeks and 95% by the age of 6 weeks. There was no maternal morbidity or mortality in the two strains or death of any of the SHR pups. No obvious physical defects were present but mean body weight was lower in the surviving WKY rats when compared to that of melatonin supplemented SHR or non-supplemented WKY pups. The reason for the high mortality in WKY pups is uncertain and appears to be strain if not batch specific. There is a need for caution in its use, particularly during pregnancy, and clearly necessitates more detailed studies. Copyright © 2011 Elsevier GmbH. All rights reserved.

  18. Current Direction and Velocity Measurements Using GPS Receivers Mounted on Floats at Tom Bevill Lock and Dam

    Science.gov (United States)

    2002-12-01

    radio and batteries. The procedures outlined in this CHETN will concentrate on the Magellan GPS ProMARK X-CP receiver as it was used to collect...The Magellan GPS ProMARK X-CP is a small robust light receiver that can log 9 hr of both pseudorange and carrier phase satellite data for post...post- processing software, pseudorange GPS data recorded by the ProMARK X-CP can be post-processed differential to achieve 1-3 m (3.3-9.8 ft) horizontal

  19. Prevalence of malaria and anaemia among HIV infected pregnant women receiving co-trimoxazole prophylaxis in Tanzania: a cross sectional study in Kinondoni Municipality.

    Science.gov (United States)

    Manyanga, Vicent P; Minzi, Omary; Ngasala, Billy

    2014-04-24

    HIV-infected pregnant women are particularly more susceptible to the deleterious effects of malaria infection particularly anaemia. In order to prevent opportunistic infections and malaria, a policy of daily co-trimoxazole prophylaxis without the standard Suphadoxine-Pyrimethamine intermittent preventive treatment (SP-IPT) was introduced to all HIV infected pregnant women in the year 2011. However, there is limited information about the effectiveness of this policy. This was a cross sectional study conducted among HIV-infected pregnant women receiving co-trimoxazole prophylaxis in eight public health facilities in Kinondoni Municipality from February to April 2013. Blood was tested for malaria infection and anaemia (haemoglobin anaemia. Pearson chi-square test, Fischer's exact test and multivariate logistic regression were used in the statistical analysis. This study enrolled 420 HIV infected pregnant women. The prevalence of malaria infection was 4.5%, while that of anaemia was 54%. The proportion of subjects with poor adherence to co-trimoxazole was 50.5%. As compared to HIV infected pregnant women with good adherence to co-trimoxazole prophylaxis, the poor adherents were more likely to have a malaria infection (Adjusted Odds Ratio, AOR = 6.81, 95% CI = 1.35-34.43, P = 0.02) or anaemia (AOR = 1.75, 95% CI = 1.03-2.98, P = 0.039). Other risk factors associated with anaemia were advanced WHO clinical stages, current malaria infection and history of episodes of malaria illness during the index pregnancy. The prevalence of malaria was low; however, a significant proportion of subjects had anaemia. Good adherence to co-trimoxazole prophylaxis was associated with reduction of both malaria infection and anaemia among HIV infected pregnant women.

  20. Cadmium toxcity in the pregnant rat

    International Nuclear Information System (INIS)

    Martin, P.G.; Hitchcock, B.B.; King, J.F.

    1978-01-01

    Iron-deficient and normal pregnant rats were assigned to groups that either received a dose of cadmium (0.025, 0.050, or 0.100 mmole) plus 8 μCi of /sup 115m/Cd on day 18 of gestation or served as a nondosed group. Animals were either sacrificed 3 days after the dosing or allowed to litter (nondosed and 0.100 mmole cadmium groups only); pups and dams were sacrificed at 14 days of age. Viability of iron-deficient dams and fetuses and pups from iron-deficient dams was affected by the 0.100 mmole cadmium dose to a greater degree than was that in comparable normal animals. Although calculated amounts of cadmium deposited in the dam's liver, kidney, blood, tibia, and fetuses were greater in iron-deficient than in normal animals at all doses, differences were not significant except in the amount of cadmium accumulated in the placenta at the highest cadmium doses. Total deposition in the placentas/litter was similar for normal and iron-deficient groups at each dose level. The decreased viability may have been due to the dam's decreased food intake; blockage of nutrients, especially minerals, by cadmium--protein complexes in the placenta; or hormonal interruptions of pregnancy by steroid--cadmium complexes

  1. Urinary Excretion of Buprenorphine, Norbuprenorphine, Buprenorphine-Glucuronide, and Norbuprenorphine-Glucuronide in Pregnant Women Receiving Buprenorphine Maintenance Treatment

    Science.gov (United States)

    Kacinko, Sherri L.; Jones, Hendree E.; Johnson, Rolley E.; Choo, Robin E.; Concheiro-Guisan, Marta; Huestis, Marilyn A.

    2011-01-01

    BACKGROUND Buprenorphine (BUP) is under investigation as a medication therapy for opioid-dependent pregnant women. We investigated BUP and metabolite disposition in urine from women maintained on BUP during the second and third trimesters of pregnancy and postpartum. METHODS We measured BUP, norbuprenorphine (NBUP), buprenorphine glucuronide (BUP-Gluc), and NBUP-Gluc concentrations in 515 urine specimens collected thrice weekly from 9 women during pregnancy and postpartum. Specimens were analyzed using a fully validated liquid chromatography-mass spectrometry method with limits of quantification of 5 µg/L for BUP and BUP-Gluc and 25 µg/L for NBUP and its conjugated metabolite. We examined ratios of metabolites across trimesters and postpartum to identify possible changes in metabolism during pregnancy. RESULTS NBUP-Gluc was the primary metabolite identified in urine and exceeded BUP-Gluc concentrations in 99% of specimens. Whereas BUP-Gluc was identified in more specimens than NBUP, NBUP exceeded BUP-Gluc concentrations in 77.9% of specimens that contained both analytes. Among all participants, the mean BUP-Gluc:NBUP-Gluc ratio was significantly higher in the second trimester compared to the third trimester, and there were significant intrasubject differences between trimesters in 71% of participants. In 3 women, the percent daily dose excreted was higher during pregnancy than postpregnancy, consistent with other data indicating increased renal elimination of drugs during pregnancy. CONCLUSIONS These data are the first to evaluate urinary disposition of BUP and metabolites in a cohort of pregnant women. Variable BUP excretion during pregnancy may indicate metabolic changes requiring dose adjustment during later stages of gestation. PMID:19325013

  2. Prevalence of diabetes mellitus among pregnant women receiving health services at the Puerto Rico University Hospital, Puerto Rico, 1997-1998.

    Science.gov (United States)

    Acosta, I; Aponte, Z; de-Jesús, Z; de-León, A; González, M C; Hernández, J; Martínez, P; Santos, E R; Pérez-Perdomo, R

    2001-06-01

    To estimate the prevalence and to describe the clinical characteristics of gestational diabetes mellitus (GDM) in pregnant women receiving health care services at the Puerto Rico University Hospital from 1997 to 1998. The study design was cross-sectional. All medical records available of pregnant women diagnosed with GDM were retrospectively reviewed. Descriptive statistics such as frequency distributions and summary measures (mean and standard deviation) were used. Annual and 18-month period prevalences of GDM were calculated. Fisher's exact test was used to compare proportions. A total of 78 medical records were available during the 18-month study period (June 1997 to December 1998). The estimated prevalence of GDM was 2% for the total study period (18-month) as well as for the year 1998. The highest proportion (52.3%) of GDM cases was found in the 30 years or less age group. Forty-eight percent had a body mass index (BMI) > or = 30 m/kg2 (obese) before pregnancy; however, the weight gained during the last pregnancy was higher than 15 pounds (57%). Sixty-four percent of the cases had a family history of diabetes, meanwhile, 34.7% reported a history of GDM during previous pregnancies. During the first prenatal visit, 80.5% reflected glucose levels higher than 110 mg/ml. Preeclampsia (6.4%) and macrosomia (14%) were the most frequent complications for the mother and the fetus, respectively. More epidemiological studies about GMD in Puerto Rico need to be performed to better describe the prevalence of the condition in the island.

  3. What do midwives need to know about approaches of women towards labour pain management? A qualitative interview study into expectations of management of labour pain for pregnant women receiving midwife-led care in the Netherlands

    NARCIS (Netherlands)

    Klomp, T.; Manniën, J.; de Jonge, J.; Hutton, E.K.; Lagro-Janssen, A.L.M.

    2014-01-01

    Objective: to investigate factors important to women receiving midwife-led care with regard to their expectations for management of labour pain. Design: semi-structured ante partum interviews and analyses using constant comparison method. Participants: fifteen pregnant women between 36 and 40 weeks

  4. What do midwives need to know about approaches of women towards labour pain management? A qualitative interview study into expectations of management of labour pain for pregnant women receiving midwife-led care in the Netherlands

    NARCIS (Netherlands)

    Klomp, T.; Mannien, J.; Jonge, A. de; Hutton, E.K.; Lagro-Janssen, A.L.M.

    2014-01-01

    OBJECTIVE: to investigate factors important to women receiving midwife-led care with regard to their expectations for management of labour pain. DESIGN: semi-structured ante partum interviews and analyses using constant comparison method. PARTICIPANTS: fifteen pregnant women between 36 and 40 weeks

  5. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  6. Unlimited access to low-energy diet causes acute malnutrition in dams and alters biometric and biochemical parameters in offspring.

    Science.gov (United States)

    do Nascimento, E; de Santana Muniz, G; das Graças de Santana Muniz, M; de Souza Alexandre, L; da Rocha, L S; Leandro, C G; de Castro, R M; Bolaños-Jimenez, F

    2014-02-01

    Here we analyze the outcomes of unlimited access to a low-energy (LE) diet in dams and their offspring. At 3 weeks' gestation, pregnant Wistar rats were divided into two groups: (1) the control group received a normoenergetic diet; and (2) the experimental group received the LE diet. In dams, lactation outcomes, food intake, body weight, plasma IGF-1, prealbumin, transferrin and retinol-binding protein levels were evaluated; in offspring, biometric and biochemical parameters and food intake were evaluated. No differences were observed during pregnancy. However, after lactation, dams that received the LE diet demonstrated significant reductions in body weight (P<0.05), plasma IGF-1 (P=0.01), prealbumin and visceral fat (P<0.001). Pups born to dams that received the LE diet demonstrated reduced body length and weight at weaning (P<0.001) and were lighter than the control animals at the end of the experimental period. Pups also demonstrated reduced plasma, low-density lipoprotein (P=0.04), triglycerides (P=0.002) and glucose levels (P<0.05), and differences were noted in visceral fat. These results indicate that feeding dams with LE diet during the reproductive period induces acute malnutrition and impairs the growth and development of offspring, as well as certain metabolic parameters.

  7. Angiogenic Factor Profiles in Pregnant Women With a History of Early-Onset Severe Preeclampsia Receiving Low-Molecular-Weight Heparin Prophylaxis.

    Science.gov (United States)

    Lecarpentier, Edouard; Gris, Jean Christophe; Cochery-Nouvellon, Eva; Mercier, Erick; Touboul, Cyril; Thadhani, Ravi; Karumanchi, S Ananth; Haddad, Bassam

    2018-01-01

    To evaluate whether daily low-molecular-weight (LMW) heparin prophylaxis during pregnancy alters profile of circulating angiogenic factors that have been linked with the pathogenesis of preeclampsia and fetal growth restriction. This is a planned ancillary study of the Heparin-Preeclampsia trial, a randomized trial in pregnant women with a history of severe early-onset preeclampsia (less than 34 weeks of gestation). In the parent study, all women were treated with aspirin and then randomized to receive LMW heparin or aspirin alone. In this study, we measured serum levels of circulating angiogenic factors (soluble fms-like tyrosine kinase-1, placental growth factor, and soluble endoglin by immunoassay) at the following gestational windows: 10-13 6/7 weeks, 14-17 6/7 weeks, 18-21 6/7 weeks, 22-25 6/7 weeks, 26-29 6/7 weeks, 30-33 6/7 weeks, and 34-37 6/7 weeks. Samples were available from 185 patients: LMW heparin+aspirin (n=92) and aspirin alone (n=93). The two groups had comparable baseline characteristics and had similar adverse composite outcomes (35/92 [38.0%] compared with 36/93 [38.7%]; P=.92). There were no significant differences in serum levels of soluble fms-like tyrosine kinase-1, placental growth factor, and soluble endoglin in the participants who received LMW heparin and aspirin compared with those who received aspirin alone regardless of gestational age period. Finally, women who developed an adverse composite outcome at less than 34 weeks of gestation demonstrated significant alterations in serum angiogenic profile as early as 10-13 6/7 weeks that was most dramatic 6-8 weeks preceding delivery. Prophylactic LMW heparin therapy when beginning from before 14 weeks of gestation with aspirin during pregnancy is not associated with an improved angiogenic profile. This may provide a molecular explanation for the lack of clinical benefit noted in recent trials. ClinicalTrials.gov, NCT00986765.

  8. Vitamin D insufficiency in HIV-infected pregnant women receiving antiretroviral therapy is not associated with morbidity, mortality or growth impairment in their uninfected infants in Botswana.

    Science.gov (United States)

    Powis, Kathleen; Lockman, Shahin; Smeaton, Laura; Hughes, Michael D; Fawzi, Wafaie; Ogwu, Anthony; Moyo, Sikhulile; van Widenfelt, Erik; von Oettingen, Julia; Makhema, Joseph; Essex, Max; Shapiro, Roger L

    2014-11-01

    Low maternal 25(OH)D (vitamin D) values have been associated with higher mortality and impaired growth among HIV-exposed uninfected (HEU) infants of antiretroviral (ART)-naive women. These associations have not been studied among HEU infants of women receiving ART. We performed a nested case-control study in the Botswana Mma Bana Study, a study providing ART to women during pregnancy and breastfeeding. Median maternal vitamin D values, and the proportion with maternal vitamin D insufficiency, were compared between women whose HEU infants experienced morbidity/mortality during 24 months of follow-up and women with nonhospitalized HEU infants. Growth faltering was assessed for never hospitalized infants attending the 24-month-of-life visit. Multivariate logistic regression models determined associations between maternal vitamin D insufficiency and infant morbidity/mortality and growth faltering. Delivery plasma was available and vitamin D levels assayable from 119 (86%) of 139 cases and 233 (84%) of 278 controls, and did not differ significantly between cases and controls [median: 36.7 ng/mL, interquartile range (IQR): 29.1-44.7 vs. 37.1 ng/mL, IQR: 30.0-47.2, P = 0.32]. Vitamin D insufficiency (HIV disease progression did not show associations between maternal vitamin D insufficiency at delivery and child morbidity/mortality, or 24-month-of-life growth faltering. Vitamin D insufficiency was common among ART-treated pregnant women in Botswana, but was not associated with morbidity, mortality or growth impairment in their HIV-uninfected children.

  9. Asymptomatic urinary tract infection among pregnant women receiving ante-natal care in a traditional birth home in Benin City, Nigeria.

    Science.gov (United States)

    Oladeinde, Bankole H; Omoregie, Richard; Oladeinde, Oladapo B

    2015-01-01

    A good proportion of pregnant women patronize traditional birth homes in Nigeria for ante-natal care. This study aimed at determining the prevalence, risk factors, and susceptibility profile of etiologic agents of urinary tract infection among ante-natal attendees in a traditional birth home in Benin City, Nigeria. Clean-catch urine was collected from 220 pregnant women attending a traditional birth home in Benin City, Nigeria. Urine samples were processed, and microbial isolates identified using standard bacteriological procedures. A cross-sectional study design was used. The prevalence of urinary tract infection among pregnant women was 55.0%, significantly affected by parity and gestational age (Pinfection was recorded among 13(10.7%) pregnant women, and was unaffected by maternal age, parity, gravidity, gestational age, and educational status. Irrespective of trimester Escherichia coli was the most prevalent etiologic agent of urinary tract infection, followed by Staphylococcus aureus. The flouroquinolones were the most effective antibacterial agents, while Sulphamethoxazole-trimetoprim, Amoxicillin, Nalidixic acid, and Nitrofurantoin had poor activity against uropathogens isolated. The prevalence of urinary tract infection among pregnant women was 55.0% and significantly affected by gestational age and parity. The most prevalent etiologic agent observed was Escherichia coli. With the exception of the flouroquinolones, aminoglycoside, and Amoxicillin-cluvanate, the activity of other antibiotics used on uropathogens were poor. Health education of the traditional birth attendant and her clients by relevant intervention agencies is strongly advocated.

  10. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  11. Prevalence of Plasmodium falciparum resistance markers to sulfadoxine-pyrimethamine among pregnant women receiving intermittent preventive treatment for malaria in Uganda

    DEFF Research Database (Denmark)

    Mbonye, Anthony K; Birungi, Josephine; Yanow, Stephanie K

    2015-01-01

    The aim of this study was to assess the prevalence of mutations in Plasmodium falciparum dihydrofolate reductase (Pfdhfr) and dihydropteroate synthase (Pfdhps) genes among pregnant women using sulfadoxine-pyrimethamine (SP) as an intermittent preventive treatment (IPTp). A molecular epidemiological...... in the Pfdhfr and Pfdhps genes that are associated with SP resistance. The prevalence of the single-nucleotide mutations in Pfdhfr at codons 51I, 59R, and 108N and in Pfdhps at codons 437G and 540E was high (>98%), reaching 100% fixation after one dose of SP, while the prevalence of 581G was 3.3% at baseline...... and anemia. However, women infected with P. falciparum had 1.3-g/dl-lower hemoglobin levels (P = 0.001) and delivered babies with a 400-g-lower birth weight (P = 0.001) compared to nonparasitemic women. Despite this, 44 women who were P. falciparum positive at baseline became negative after one or two doses...

  12. Alpine dams

    Directory of Open Access Journals (Sweden)

    Alain Marnezy

    2009-03-01

    Full Text Available Les barrages-réservoirs de montagne ont été réalisés initialement dans les Alpes pour répondre à la demande d’énergie en période hivernale. Une certaine diversification des usages de l’eau s’est ensuite progressivement développée, en relation avec le développement touristique des collectivités locales. Aujourd’hui, la participation des ouvrages d’Électricité De France à la production de neige de culture représente une nouvelle étape. Dans les régions où les aménagements hydroélectriques sont nombreux, les besoins en eau pour la production de neige peuvent être résolus par prélèvements à partir des adductions EDF. Les gestionnaires de stations échappent ainsi aux inconvénients liés à la construction et à la gestion des « retenues collinaires ». Cette évolution, qui concerne déjà quelques régions alpines comme la haute Maurienne ou le Beaufortin, apparaît comme une forme renouvelée d’intégration territoriale de la ressource en eau.Mountain reservoirs were initially built in the Alps to meet energy needs in the winter. A certain diversification in the uses of water then gradually developed, related to tourism development in the local communities. Today, the use of facilities belonging to EDF (French Electricity Authority to provide water for winter resorts to make artificial snow represents a new phase. By taking water from EDF resources to supply snow-making equipment, resort managers are thus able to avoid the problems related to the construction and management of small headwater dams. This new orientation in the use of mountain water resources already affects a number of alpine regions such as the Upper Maurienne valley and Beaufortain massif and represents a renewed form of the territorial integration of water resources.

  13. Characteristics of transplacental lead transfer in rat dams and fetuses

    International Nuclear Information System (INIS)

    Kopfler, F.C.; Miller, R.G.; Kowal, N.E.; Kelty, K.C.; Doerger, J.U.; Mills, T.

    1987-01-01

    This study was designed to quantitate the dose resulting from lead exposure during the critical periods of brain development during gestation by determining: (1) if blood lead concentration in rat dams is affected by pregnancy status or duration of lead exposure, (2) if lead concentration in fetuses is associated with the duration of dam exposure, (3) the rates of lead absorption and elimination in pregnant and nonpregnant dams; and (4) the effect that prebreeding exposure on lead kinetics in the dam and upon fetus blood lead concentrations. The results of experiments in which the dams' drinking water contained 50 mg/L lead indicate blood lead levels (after normalizing by water consumption on a body weight basis) of pregnant rats are significantly higher than blood lead levels of non-pregnant rats. Statistical differences in blood lead levels were observed by day 15 of gestation and continue through day 20 of gestation. These blood lead differences are not due to lead treatment prior to breeding as seen when comparing Figure 1 and Figure 2. The blood lead levels of the fetuses at day 20 of gestation were 50-60% higher than that of the corresponding dams. The results from the latter two phases were ambiguous, due to large variability in individual animal absorption and elimination rates. However, the following observations can be made. Preexposure to lead does not affect the percent of lead transferred from the dams' blood to the fetuses. The rate of elimination of lead from the dams' blood does not appear to be affected by prebreeding exposure to lead or by the status of pregnancy. The fraction of the 203 Pb dose transferred to the fetus increases dramatically toward the end of gestation. The data suggest that lead absorption from the gut of pregnant rats is higher than that for nonpregnant rats

  14. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  15. Radiation effect on pregnant rats receiving progesterone and Biochemical changes during pregnancy in rats under effect of gamma rays. Vol. 4

    International Nuclear Information System (INIS)

    Abdel-Wahab, M.F.; Abdel-Aziz, S.M.; Abdel-Gawad, I.I.

    1996-01-01

    The following terms were carried out to provide a comprehensive picture of the radiation induced biochemical changes in pregnant rats with and without progesterone injections. 1- serum total proteins. Animals irradiated on the third day and sacrificed on day 8, 14, 18, and 21 showed non-significant increase in serum total proteins on the day 8 of gestation in irradiated animals as compared to control animals, while on the other days serum total proteins increased significantly in irradiated animals compared to control animals. 2- serum total lipids. Animals irradiated on the third day of gestation and 8 th day all showed significant increase in serum total lipids with exception of those on the 14 th which showed nonsignificant change. Those on the 21 st showed a reverse effect of decrease. 3- serum progesterone. It is evident that animals irradiated on third day sacrificed on day 8, 14, 18, and 21 showed non-significant change in serum progesterone on the day 8, but on the other days it is significantly decreased compared to control levels. 4-Calcium. Animals irradiated on the third day and sacrificed on the 8 th day change in calcium level, others showed a significant decrease compared to control level. 8 figs., 2 tabs

  16. Radiation effect on pregnant rats receiving progesterone and Biochemical changes during pregnancy in rats under effect of gamma rays. Vol. 4

    Energy Technology Data Exchange (ETDEWEB)

    Abdel-Wahab, M F; Abdel-Aziz, S M; Abdel-Gawad, I I [Radioisotope Department, Atomic Energy Authority, Dokki, (Egypt)

    1996-03-01

    The following terms were carried out to provide a comprehensive picture of the radiation induced biochemical changes in pregnant rats with and without progesterone injections. 1- serum total proteins. Animals irradiated on the third day and sacrificed on day 8, 14, 18, and 21 showed non-significant increase in serum total proteins on the day 8 of gestation in irradiated animals as compared to control animals, while on the other days serum total proteins increased significantly in irradiated animals compared to control animals. 2- serum total lipids. Animals irradiated on the third day of gestation and 8{sup th} day all showed significant increase in serum total lipids with exception of those on the 14{sup th} which showed nonsignificant change. Those on the 21{sup st} showed a reverse effect of decrease. 3- serum progesterone. It is evident that animals irradiated on third day sacrificed on day 8, 14, 18, and 21 showed non-significant change in serum progesterone on the day 8, but on the other days it is significantly decreased compared to control levels. 4-Calcium. Animals irradiated on the third day and sacrificed on the 8{sup th} day change in calcium level, others showed a significant decrease compared to control level. 8 figs., 2 tabs.

  17. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  18. Dams designed to fail

    Energy Technology Data Exchange (ETDEWEB)

    Penman, A. [Geotechnical Engineering Consultants, Harpenden (United Kingdom)

    2004-09-01

    New developments in geotechnical engineering have led to methods for designing and constructing safe embankment dams. Failed dams can be categorized as those designed to fail, and those that have failed unexpectedly. This presentation outlined 3 dam failures: the 61 m high Malpasset Dam in France in 1959 which killed 421; the 71 m high Baldwin Hills Dam in the United States in 1963 which killed 5; and, the Vajont Dam in Italy in 1963 which killed 2,600 people. Following these incidents, the International Commission for Large Dams (ICOLD) reviewed regulations on reservoir safety. The 3 dams were found to have inadequate spillways and their failures were due to faults in their design. Fuse plug spillways, which address this problem, are designed to fail if an existing spillway proves inadequate. They allow additional discharge to prevent overtopping of the embankment dam. This solution can only be used if there is an adjacent valley to take the additional discharge. Examples of fuse gates were presented along with their effect on dam safety. A research program is currently underway in Norway in which high embankment dams are being studied for overtopping failure and failure due to internal erosion. Internal erosion has been the main reason why dams have failed unexpectedly. To prevent failures, designers suggested the use of a clay blanket placed under the upstream shoulder. However, for dams with soft clay cores, these underblankets could provide a route for a slip surface and that could lead to failure of the upstream shoulder. It was concluded that a safe arrangement for embankment dams includes the use of tipping gates or overturning gates which always fail at a required flood water level. Many have been installed in old and new dams around the world. 14 refs., 19 figs.

  19. Mechanics of slide dams

    International Nuclear Information System (INIS)

    Young, G.A.

    1970-01-01

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  20. Mechanics of slide dams

    Energy Technology Data Exchange (ETDEWEB)

    Young, G A [Engineering, Agbabian-Jacobsen Associates, Los Angeles (United States)

    1970-05-15

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  1. The effect of inflatable obstetric belts in nulliparous pregnant women receiving patient-controlled epidural analgesia during the second stage of labor.

    Science.gov (United States)

    Kim, Jong-Woon; Kim, Yoon Ha; Cho, Hye Yon; Shin, Hee-Young; Shin, Jong Chul; Choi, Sea Kyung; Lee, Keun-Young; Song, Ji-Eun; Lee, Pil-Ryang

    2013-11-01

    The aim of this study was to evaluate the effect of inflatable obstetric belts on uterine fundal pressure in the management of the second stage of labor. Between July 2009 and December 2010, 188 nulliparous women with a singleton pregnancy at term were enrolled and only one dropped. The participants were randomized to receive either standard care (control group, n = 91) or uterine fundal pressure by the Labor Assister (Baidy M-520/Curexo, Inc., Seoul, Korea; active group, n = 97) during the second stage of labor in addition to standard care. The Labor Assister is an inflatable obstetric belt that is synchronized to apply constant fundal pressure during a uterine contraction. The primary endpoint was duration of the second stage of labor in women who delivered vaginally (control, n = 80 versus active, n = 93). It was not analyzed in women who delivered by cesarean section (n = 14) and delivered precipitously (n = 1). The secondary outcomes are perinatal outcomes and perineal laceration. Participants received patient-controlled epidural analgesia. The 93 women in the active group spent less time in the second stage of labor when compared to the 80 women in the control group (46.51 ± 28.01 min versus 75.02 ± 37.48 min, p labor without complications in nulliparous women who receive patient-controlled epidural analgesia.

  2. Tailings dams from the perspective of conventional dam engineering

    International Nuclear Information System (INIS)

    Szymanski, M.B.

    1999-01-01

    A guideline intended for conventional dams such as hydroelectric, water supply, flood control, or irrigation is used sometimes for evaluating the safety of a tailings dam. Differences between tailings dams and conventional dams are often substantial and, as such, should not be overlooked when applying the techniques or safety requirements of conventional dam engineering to tailings dams. Having a dam safety evaluation program developed specifically for tailings dams is essential, if only to reduce the chance of potential errors or omissions that might occur when relying on conventional dam engineering practice. This is not to deny the merits of using the Canadian Dam Safety Association Guidelines (CDSA) and similar conventional dam guidelines for evaluating the safety of tailings dams. Rather it is intended as a warning, and as a rationale underlying basic requirement of tailings dam emgineering: specific experience in tailings dams is essential when applying conventional dam engineering practice. A discussion is included that focuses on the more remarkable tailings dam safety practics. It is not addressed to a technical publications intended for such dams, or significantly different so that the use of conventional dam engineering practice would not be appropriate. The CDSA Guidelines were recently revised to include tailings dams. But incorporating tailings dams into the 1999 revision of the CDSA Guidelines is a first step only - further revision is necessary with respect to tailings dams. 11 refs., 2 tabs

  3. High fetal irradiation: about one pregnant woman receiving infra diaphragmatic radiotherapy for Hodgkin lymphoma; Irradiation foetale elevee: a propos d'une femme dont la grossesse etait meconnue irradiee en sous-diaphragmatique pour un lymphome hodgkinien

    Energy Technology Data Exchange (ETDEWEB)

    Moreau, M.V.; Brunaud, C.; Marchesi, V.; Hoffstetter, S.; Peiffert, D. [Centre Alexis-Vautrin, Service de Radiotherapie, 54 - Vandoeuvre-les-Nancy (France); Bologna, S. [Centre Hospitalier Universitaire Nancy-Brabois, Service d' Hematologie, 54 - Vandoeuvre-les-Nancy (France)

    2007-12-15

    We report the case of a 19-year-old young woman for whom was discovered a pregnancy at the end of the irradiation for a Hodgkin lymphoma (stage IV bone Bb), initially treated by chemotherapy. The radiotherapy delivered 36 Gy in infra-diaphragmatic volumes (lumbo-aortic, spleen, L5), beginning in a pregnant patient for less than 4 amenorrhea weeks. The calculated received fetal dose (literature data, measurement with software T.P.S., measurement on phantom) is high: it's between 2.8 and 5 Gy. With a current follow-up of 4 years since the radiotherapy's end, the patient is in complete remission and her child presents with a normal development for the age, in spite of the infra diaphragmatic irradiation. (authors)

  4. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  5. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H. [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  6. Spruce Lake Dam reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, G. [SGE Acres Ltd., Fredericton, NB (Canada); Barnard, J. [SGE Acres Ltd., St. John' s, NF (Canada); Vriezen, C. [City of Saint John, NF (Canada); Stephenson, M. [Jacques Whitford Environment Ltd., Fredericton, NB (Canada)

    2004-09-01

    Spruce Lake Dam was constructed in 1898 as part of the water supply system for Saint John, New Brunswick. The original dam was a 6 meter high, 140 meter long concrete gravity dam with an intake structure at its mid point and an overflow spillway at the left abutment. A rehabilitation project was launched in 2001 to bring the deteriorated dam into conformance with the dam safety guidelines of the Canadian Dam Association. The project criteria included minimal disruption to normal operation of water supply facilities and no negative effect on water quality. The project involved installation of a new low level outlet, removal of a gate house and water intake pipes, replacement of an access road culvert in the spillway channel, and raising the earth dam section by 1.8 meters to allow for increased water storage. The new raised section has an impervious core. The project also involved site and geotechnical investigations as well as hydrotechnical and environmental studies. This presentation described the final design of the remedial work and the environmental permitting procedures. Raising the operating level of the system proved successful as demonstrated by the fewer number of pumping days required after dam rehabilitation. The dam safety assessment under the Canadian Environmental Assessment Act began in April 2001, and the rehabilitation was completed by the end of 2002. 1 tab., 8 figs.

  7. Seroprevalence of HIV, HTLV, CMV, HBV and rubella virus infections in pregnant adolescents who received care in the city of Belém, Pará, Northern Brazil.

    Science.gov (United States)

    Guerra, Aubaneide Batista; Siravenha, Leonardo Quintão; Laurentino, Rogério Valois; Feitosa, Rosimar Neris Martins; Azevedo, Vânia Nakauth; Vallinoto, Antonio Carlos Rosário; Ishak, Ricardo; Machado, Luiz Fernando Almeida

    2018-05-16

    Prenatal tests are important for prevention of vertical transmission of various infectious agents. The objective of this study was to describe the prevalence of human immunodeficiency virus (HIV), human T-lymphotropic virus (HTLV), hepatitis B virus (HBV), cytomegalovirus (CMV), rubella virus and vaccination coverage against HBV in pregnant adolescents who received care in the city of Belém, Pará, Brazil. A cross-sectional study was performed with 324 pregnant adolescents from 2009 to 2010. After the interview and blood collection, the patients were screened for antibodies and/or antigens against HIV-1/2, HTLV-1/2, CMV, rubella virus and HBV. The epidemiological variables were demonstrated using descriptive statistics with the G, χ 2 and Fisher exact tests. The mean age of the participants was 15.8 years, and the majority (65.4%) had less than 6 years of education. The mean age at first intercourse was 14.4 years, and 60.8% reported having a partner aged between 12 and 14 years. The prevalence of HIV infection was 0.3%, and of HTLV infection was 0.6%. Regarding HBV, 0.6% of the participants had acute infection, 9.9% had a previous infection, 16.7% had vaccine immunity and 72.8% were susceptible to infection. The presence of anti-HBs was greater in adolescent between 12 and 14 years old (28.8%) while the anti-HBc was greater in adolescent between 15 and 18 years old (10.3%). Most of the adolescents presented the IgG antibody to CMV (96.3%) and rubella (92.3%). None of the participants had acute rubella infection, and 2.2% had anti-CMV IgM. This study is the first report of the seroepidemiology of infectious agents in a population of pregnant adolescents in the Northern region of Brazil. Most of the adolescents had low levels of education, were susceptible to HBV infection and had IgG antibodies to CMV and rubella virus. The prevalence of HBV, HIV and HTLV was similar to that reported in other regions of Brazil. However, the presence of these agents in this

  8. MNR's role in public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, Jennifer [Ministry of Natural Resources, Peterborough, ON (Canada)

    2011-07-01

    The Ministry of Natural Resources (MNR) is the largest dam owner in Ontario with around 400 dams located all across the province. MNR works to exercise stewardship of Ontario's water resources in a context of public safety, employee safety and environmental awarenes. This presentation shows the different measures MNR implemented to reduce risks. Warning signs, safety booms, barrel buoys and pedestrian fencing have been installed around dams to alert the public to possible dangers. In addition, MNR employees receive training in how to inspect dams for safety concerns, how to identify problems which could result in hazards to the public and how to work safely.

  9. Geodetic deformation monitoring at Pendidikan Diponegoro Dam

    Science.gov (United States)

    Yuwono, Bambang Darmo; Awaluddin, Moehammad; Yusuf, M. A.; Fadillah, Rizki

    2017-07-01

    Deformation monitoring is one indicator to assess the feasibility of Dam. In order to get the correct result of the deformation, it is necessary to determine appropriate deformation monitoring network and the observation data should be analyse and evaluated carefully. Measurement and analysis of deformation requires relatively accurate data and the precision is high enough, one of the observation method that used is GPS (Global Positioning System). The research was conducted at Pendidikan Undip Dams is Dam which is located in Tembang. Diponegoro Dam was built in 2013 and a volume of 50.86 m3 of water, inundation normal width of up to 13,500 m2. The main purpose of these building is not only for drainage but also for education and micro hydro power plant etc. The main goal of this reasearch was to monitor and analyze the deformation at Pendidikan Undip Dam and to determaine whether GPS measurement could meet accuracy requirement for dam deformation measurements. Measurements were made 2 times over 2 years, 2015 and 2016 using dual frequency GPS receivers with static methods and processed by Scientific Software GAMIT 10.6

  10. Oral Mucosal Disorders in Pregnant versus Non-Pregnant Women

    Directory of Open Access Journals (Sweden)

    Fahimeh Rezazadeh

    2014-12-01

    Full Text Available The effects of pregnancy on the Oral Mucosa Disorder (OMD have been sporadically documented in some developed countries. Less known is the status of OMD during pregnancy in less developed/developing countries. Iran is no exception. This study assesses the prevalence of OMD in 200 pregnant women and compares the findings with the findings from a 200 non-pregnant woman of similar age distribution in Iran. The participants had been referred to a clinic to receive reproductive age-related services. Participants suffering from systemic chronic diseases, those on medications/drugs, smokers, needing biopsies, and those with urgent Oral Mucosal Lesion (OML treatments were excluded from the study. Oral mucosal of all 400 participants were examined. The participants’ age ranges were from 17 to 47; with the average age of 33.14 for one group; and 30.23 for the other group. Both groups had the same level of formal education. Out of 400 examined women; 62 had lesions, including 47 pregnant (23.5%; and 15 non-pregnant (7.5% women. This result shows that the OMD rate of occurrence was significantly higher among the pregnant women. Higher OML prevalence in pregnant women, as compared to the non-pregnant women, indicates the importance of timely oral examination of pregnant women and subsequent treatment plans for them.

  11. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  12. INDIRECT UPSTREAM EFFECTS OF DAMS: CONSEQUENCES OF MIGRATORY CONSUMER EXTIRPATION IN PUERTO RICO

    Science.gov (United States)

    EFFIE A. GREATHOUSE; CATHERINE M. PRINGLE; WILLIAM H. MCDOWELL; JEFF G. HOLMQUIST

    2006-01-01

    Large dams degrade the integrity of a wide variety of ecosystems, yet direct downstream effects of dams have received the most attention from ecosystem managers and researchers. We investigated indirect upstream effects of dams resulting from decimation of migratory freshwater shrimp and fish populations in Puerto Rico, USA, in both high- and low-gradient streams. In...

  13. Allegheny County Dam Locations

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset shows the point locations of dams in Allegheny County. If viewing this description on the Western Pennsylvania Regional Data Center’s open data portal...

  14. Pregnant Bodies

    OpenAIRE

    Børve , Hege Eggen

    2007-01-01

    Abstract This article examines the impact that the interplay between workplace, the welfare state and global working life has on female workers when they become pregnant. By focusing on two highly educated Norwegian female workers, it explores how this change process takes place in two companies operating in the global market located in different countries: Norway and the US. Pregnancy contributes to transforming the neutralized bodiless female worker into an embodied worker with g...

  15. Teton Dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Snorteland, N. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case summary discussed an internal erosion failure that occurred at the embankment foundation of Teton Dam. The project was designed as a run-of-the-river power generation facility and to provide irrigation, flood protection, and power generation to the lower Teton region of southern Idaho. The dam site was located next to the eastern Snake River plain, a volcanic filled depression. The foundation's cutoff trench was excavated into the bedrock along the length of the dam. The dam was designed as a zoned earthfill with a height of 305 feet. A trench made of low plasticity windblown silt was designed to connect the embankment core to the rock foundation. Seeps were noted in 1976, and a leak was observed near the toe of the dam. A wet spot appeared on the downstream face of the dam at elevation 5200. A sinkhole then developed. The embankment crest collapsed, and the dam breached. Peak outflow was estimated at 1,000,000 cfs. The failure was attributed to a lack of communication between designers, a failure to understand geologic information about the region, and an insufficient review of designs and specifications by designers and field personnel. No monitoring instrumentation was installed in the embankment. Approximately 300 square miles were inundated, and 25,000 people were displaced. Eleven people were killed. A review group noted that the rock surface was not adequately sealed, and that the dam failed as a result of inadequate protection of the impervious core material from internal erosion. 42 figs.

  16. Teratogenicity and metabolism of water-soluble forms of vitamin A in the pregnant rat

    International Nuclear Information System (INIS)

    Gunning, D.B.; Barua, A.B.; Olson, J.A.

    1990-01-01

    Retinoyl β-glucuronide, unlike retinoic acid, has been shown to be non-teratogenic when administered orally, even in large doses, to pregnant rats. The degree to which water-solubility is associated with low teratogenicity is not known. Other water-soluble forms of vitamin A have now been synthesized in our laboratory and are being evaluated for teratogenicity. New water-soluble forms of vitamin A were administered orally to pregnant Sprague-Dawley rats in a single dose of 0.35 mmole/kg bw on day 8 of gestation. On day 19, the dams were sacrificed and the litters were examined. Control animals received either vehicle only or an equivalent dose of all-trans retinoic acid. Maternal and fetal tissues were taken and analyzed by HPLC for vitamin A metabolites. In another experiment, a large single oral dose of the radiolabelled water-soluble compound was administered on day 10. At either 30 minutes or 1 hour after the dose, dams were sacrificed and the embryos analyzed both for radioactivity and for specific metabolites. In contrast to retinoyl β-glucuronide, retinoyl β-glucose is highly teratogenic under identical conditions. Thus, water-solubility does not seem to be the determining factor in the teratogenicity of retinoic acid conjugates

  17. Dams and Intergovernmental Transfers

    Science.gov (United States)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  18. Measurement of Dam Deformations: Case Study of Obruk Dam (Turkey)

    Science.gov (United States)

    Gulal, V. Engin; Alkan, R. Metin; Alkan, M. Nurullah; İlci, Veli; Ozulu, I. Murat; Tombus, F. Engin; Kose, Zafer; Aladogan, Kayhan; Sahin, Murat; Yavasoglu, Hakan; Oku, Guldane

    2016-04-01

    '. In October of 2015, geodetic deformation measurements were conducted by considering FIG reports related to deformation measurements and German DIN 18710 Engineering Measurements norms in the Çorum province of Turkey. The main purpose of the study is to determine optimum measurement and evaluation methods that will be used to specify movements in the horizontal and vertical directions for the fill dam. For this purpose; • In reference networks consisting of 8 points, measurements were performed by using long-term dual-frequency GNSS receivers for duration of 8 hours. • GNSS measurements were conducted in varying times between 30 minutes and 120 minutes at the 44 units object points on the body of the dam. • Two repetitive measurements of real time kinematic (RTK) GNSS were conducted at the object points on dam. • Geometric leveling measurements were performed between reference and object points. • Trigonometric leveling measurements were performed between reference and object points. • Polar measurements were performed between references and object points. GNSS measurements performed at reference points of the monitoring network for 8 hours have been evaluated by using GAMIT software in accordance with the IGS points in the region. In this manner, regional and local movements in the network can be determined. It is aimed to determine measurement period which will provide 1-2mm accuracy that expected in local GNSS network by evaluating GNSS measurements performed on body of dam. Results will be compared by offsetting GNSS and terrestrial measurements. This study will investigate whether or not there is increased accuracy provided by GNSS measurements carried out among reference points without the possibility of vision.

  19. Small dams need better management

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Many small dams around the world are poorly maintained and represent a safety hazard, according to Pisaniello et al. Better oversight of small dams is needed, the authors argue. The researchers reviewed literature, conducted case studies in four states in Australia, and developed policy benchmarks and best practices for small-dam management. Small dams, often just several meters high and typically privately owned by individual farmers, have historically caused major damage when they fail. For instance, in China in 1975, 230,000 people died when two large dams failed because of the cumulative failure of 60 smaller upstream dams. In the United States, in 1977 the 8-meter-high Kelly Barnes Lake dam failed, killing 39 people. Many other small-dam failures around the world have resulted in casualties and severe ecological and economic damage.

  20. [An innovative policy for supporting pregnant women].

    Science.gov (United States)

    Perz, Stéphanie

    2015-04-01

    Improving working conditions for pregnant women can boost their feeling of wellbeing in their job. As a result of its innovative work in this area, Seclin general hospital, in the north of France, has received special recognition for its policy in supporting pregnant women. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  1. Vaccination recommended for pregnant women

    Directory of Open Access Journals (Sweden)

    Justyna Magdalena Skolarczyk

    2017-04-01

    Full Text Available A vaccine is a formulation of biological origin that contains substances capable of inducing immune processes without the ability to cause a disease. Vaccination is considered the best mean to prevent infectious diseases and their serious complications. Vaccination of a pregnant women can provide protection against severe infectious diseases of both pregnant women and their children. The aim of the study is to present currently available types of vaccines recommended for pregnant women and indications for their use by analyzing the data available in the PubMed, and Medline electronic databases. In the United States, vaccination recommendations for pregnant women include inactivated influenza vaccine and tetanus and diphtheria toxoid vaccine (Tdap. In some countries, pregnant women also receive a vaccine against hepatitis B as well as anti hepatitis A and E. There are also studies on vaccines against the RSV virus and pneumococci. Vaccination is the most effective form of prevention of infectious diseases and their use during pregnancy does not entail any additional risk to the mother or her baby. The benefits of vaccination are huge, so pregnant women should take  recommended vaccination and shouldn’t  be afraid of using them.

  2. Wynoochee Dam Foundation Report

    Science.gov (United States)

    1988-01-01

    schists and in propylitized andesite volcanic rocks. Tests on chlorite-bearing graywackes (Lumni Island and Robe Quarry, Seattle District) and... propylitized chlorite-bearing andesites (Blue River and Lookout Point Dams, Portland District) have shown these rocks to be durable materials with only minor

  3. The Swiss lodized Salt Program Provides Adequate Iodine for School Children and Pregnant Women, but Weaning Infants Not Receiving Iodine-Containing Complementary Foods as well as Their Mothers Are Iodine Deficient

    NARCIS (Netherlands)

    Andersson, M.; Aeberli, I.; Wüst, N.; Piacenza, A.M.; Bucher, T.; Henschen, I.; Haldimann, M.; Zimmermann, M.B.

    2010-01-01

    Background: If children and pregnant women in the population are iodine sufficient, it is generally assumed infants are also sufficient. But weaning infants may be at risk of iodine deficiency because iodized salt contributes little dietary iodine during this period. To fill this gap, iodine

  4. Expansion at Olympic Dam

    International Nuclear Information System (INIS)

    Lewis, C.

    1997-01-01

    The Olympic Dam orebody is the 6th largest copper and the single largest uranium orebody in the world. Mine production commenced in June 1988, at an annual production rate of around 45,000 tonnes of copper and 1,000 tonnes of uranium. Western Mining Corporation announced in 1996 a proposed $1.25 billion expansion of the Olympic Dam operation to raise the annual production capacity of the mine to 200,000 tonnes of copper, approximately 3,700 tonnes of uranium, 75,000 ounces of gold and 950,000 ounces of silver by 2001. Further optimisation work has identified a faster track expansion route, with an increase in the capital cost to $1.487 billion but improved investment outcome, a new target completion date of end 1999, and a new uranium output of 4,600 tonnes per annum from that date

  5. Dam spills and fishes

    International Nuclear Information System (INIS)

    1996-01-01

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.)

  6. Ecological risk assessment of hydropower dam construction based on ecological network analysis

    OpenAIRE

    Chen, Shaoqing; Fath, Brian D.; Chen, Bin

    2010-01-01

    Dam construction is regarded as one of the major factors contributing to significant modifications of the river ecosystems, and the ecological risk (ER) assessment of dam construction has received growing attention in recent years. In the present study, we explored the potential ecological risk caused by dam project based on the general principles of the ecological risk assessment. Ecological network analysis was proposed as the usable analytic method for the implement of ecological risk asse...

  7. Odelouca Dam Construction: Numerical Analysis

    OpenAIRE

    Brito, A.; Maranha, J. R.; Caldeira, L.

    2012-01-01

    Odelouca dam is an embankment dam, with 76 m height, recently constructed in the south of Portugal. It is zoned with a core consisting of colluvial and residual schist soil and with soil-rockfill mixtures making up the shells (weathered schist with a significant fraction of coarse sized particles). This paper presents a numerical analysis of Odelouca Dam`s construction. The material con-stants of the soil model used are determined from a comprehensive testing programme carried out in the C...

  8. Health impacts of large dams

    International Nuclear Information System (INIS)

    Lerer, L.B.

    1999-01-01

    Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects

  9. Dam Break Analysis of Embankment Dams Considering Breach Characteristics

    Directory of Open Access Journals (Sweden)

    Abolfazl Shamsaei

    2004-05-01

    Full Text Available The study of dam's break, needs the definition of various parameters such as the break cause, its type, its dimension and the duration of breach development. The precise forecast for different aspects of the breach is one of the most important factors for analyzing it in embankment dam. The characteristics of the breach and determination of their vulnerability has the most effect on the waves resulting from dam break. Investigating, about the parameters of the breach in "Silveh" earth dam have been determined using the suitable model. In Silve dam a trapezoid breach with side slope z=0.01m and the average base line b=80m was computed. The duration of the breaches development is 1.9 hour. Regarding the above results and the application of DAM Break software the consequences of the probable break of the dam was determined. The analysis of the results of water covering of the city of Piranshahr located 12km from silve dam confirms that in 3 hours the water will reach the height (level of 1425 meters.

  10. The mathematics of dam safety

    Energy Technology Data Exchange (ETDEWEB)

    Widmann, R. [Osterreichische Gesellschaft fuer Geomechanik, Salzburg (Austria)

    1997-05-01

    The safety of a dam is determined by its design, construction and supervision during operation. High arch dam failures have dropped dramatically since the early part of this century. An essential part of the success story relates to improved measurement techniques that can detect earlier unexpected behaviour that may lead to failure. (UK)

  11. Evaluatie Dam tot Damloop 2014

    NARCIS (Netherlands)

    Deutekom-Baart de la Faille, Marije

    In het weekend van 20 en 21 september 2014 vond de 30ste editie van de Dam tot Damloop plaats. Onderzoekers van de Hogeschool van Amsterdam en Hogeschool Inholland hebben bij de Dam tot Damloop een evaluatieonderzoek uitgevoerd met als doel het vinden van aanknopingspunten voor het structureel

  12. War damages and reconstruction of Peruca dam

    International Nuclear Information System (INIS)

    Nonveiller, E.; Sever, Z.

    1999-01-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described

  13. Damming evidence : Canada and the World Commission on Dams

    Energy Technology Data Exchange (ETDEWEB)

    Vert, P.; Parkinson, B.

    2003-06-01

    Large hydroelectric projects have been met with strong resistance from affected communities, particularly indigenous groups who have been displaced from their flooded communities following the damming of a river. The World Commission on Dams (WCD) was formed in 1998 to review the effectiveness of large dams and develop internationally acceptable guidelines and standards for large dams or hydro energy projects. The Canadian government, through the Canadian International Development Agency, was one of many governments to fund the WCD. However, the authors argue that despite the financial support, the Canadian government was absent from any effort to follow-up on the recommendations of the WCD. The seven strategic priorities in the decision making process include: (1) gaining public acceptance, (2) comprehensive option assessment of water, energy, food and development needs, (3) addressing existing dams to improve the benefits that can be derived from them, (4) sustaining livelihoods, (5) recognizing the entitlements and sharing benefits, (6) ensuring compliance, and (7) sharing rivers for peace, development and security. This report offers a means to assess planned or existing dams and presents a set of guidelines for good practices linked to the seven strategic priorities. Ten case studies from around the world were presented, including the Three Gorges Dam in China. 154 refs., 3 figs., 3 appendices.

  14. Olympic Dam Operations

    International Nuclear Information System (INIS)

    Crew, R.J.

    1992-01-01

    The Olympic Dam copper-uranium-gold-silver deposit in South Australia was discovered in 1975. The Mine is located 520 kilometres NNW of Adelaide, in South Australia. Following a six year period of intensive investigation and assessment of all the aspects required for the development of the deposit, the Joint Venturers decided in December, 1985, to proceed with the project. Milling of ore commenced in June 1988 and final products are cathode copper, uranium ore concentrate (yellow cake), and refined gold and silver. Anticipated production, from treating approximately 1.5 million tonnes of ore, in normal production years, is expected to be 45,000 tonnes of copper, 1,600 tonnes of yellow cake (1350 tonnes of Uranium), 25,000 ounces of gold and 500,000 ounces of silver. (orig./HP) [de

  15. Rehabilitation at Olympic Dam

    International Nuclear Information System (INIS)

    Chandler, W.P.; Middleton, B.A.

    1986-01-01

    Rehabilitation work on areas denuded of vegetation during the exploration phase of the Olympic Dam project was used to test various methods for regeneration of vegetation cover in the arid zone. The test work carried out on drill pads and access tracks has indicated that, with adequate site preparation, natural regeneration is the most economical and effective method to ensure post-operational stability of the affected land-forms. An on-going monitoring regime, utilising a computer data base, has been set up to allow year-to-year comparison of rehabilitation effectiveness. The database also provides a catalogue of initial colonising plants and a measure of variations in species diversity with time

  16. Low-protein diet does not alter reproductive, biochemical, and hematological parameters in pregnant Wistar rats

    Directory of Open Access Journals (Sweden)

    M.A.V. Barros

    2018-05-01

    Full Text Available The aim of this study was to investigate the reproductive, biochemical, and hematological outcomes of pregnant rats exposed to protein restriction. Wistar rat dams were fed a control normal-protein (NP, 17% protein, n=8 or a low-protein (LP, 8% protein, n=14 diet from the 1st to the 20th day of pregnancy. On the 20th day, the clinical signs of toxicity were evaluated. The pregnant rats were then anesthetized and blood samples were collected for biochemical-hematological analyses, and laparotomy was performed to evaluate reproductive parameters. No sign of toxicity, or differences (P>0.05 in body weight gain and biochemical parameters (urea, creatinine, albumin, globulin, and total protein between NP and LP pregnant dams were observed. Similarly, hematological data, including red blood cell count, white blood cell count, hemoglobin, hematocrit, red blood cell distribution width (coefficient of variation, mean corpuscular volume, mean corpuscular hemoglobin, mean corpuscular hemoglobin concentration, % lymphocytes, absolute lymphocyte count, platelet count, and mean platelet volume were similar (P>0.05 at the end of pregnancy. Reproductive parameters (the dam-offspring relationship, ovary mass, placenta mass, number of corpora lutea, implantation index, resorption index, and the pre- and post-implantation loss rates were also not different (P>0.05 between NP and LP pregnant dams. The present data showed that a protein-restricted diet during pregnancy did not alter reproductive, biochemical, and hematological parameters and seems not to have any toxic effect on pregnant Wistar rats.

  17. Dam pre-release as an important operation strategy in reducing flood impact in Malaysia

    Science.gov (United States)

    Hidayah Ishak, Nurul; Mustafa Hashim, Ahmad

    2018-03-01

    The 2014 flood was reported to be one of the worst natural disaster has ever affected several states in the northern part of Peninsular Malaysia. Overwhelming rainfall was noted as one of the main factors causing such impact, which was claimed to be unprecedented to some extent. The state of Perak, which is blessed with four cascading dams had also experienced flood damage at a scale that was considered the worst in history. The rainfall received had caused the dam to reach danger level that necessitated additional discharge to be released. Safety of the dams was of great importance and such unavoidable additional discharge was allowed to avoid catastrophic failure of the dam structures. This paper discusses the dam pre-release as a significant dam management strategy in reducing flood impact. An important balance between required dam storage to be maintained and the risk element that can be afforded is the crucial factor in such enhanced operation strategy. While further possibility in developing a carefully engineered dam pre-release strategy can be explored for dam operation in Malaysia, this has already been introduced in some developed countries. Australia and South Africa are examples where pre-release has been practiced and proven to reduce flood risk. The concept involves controlling the dam lake level throughout the year, in reference to the rainfall data and the hydrological properties for the catchment area of the dams. Plentiful data analysis need to be done in contemplation of producing the optimal pre-release model. The amount of heavy rainfalls received is beyond human control but the distribution of the discharge from the dams can be further managed with the appropriate pre-release strategy.

  18. Deformation performance of Waba Dam

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, T.; Bhardwaj, V.; Hassan, P. [Ontario Power Generation, Niagara-on-the-Lake, ON (Canada); Cragg, C. [Cragg Consulting Services, Toronto, ON (Canada)

    2009-07-01

    This paper described the performance of the Waba Dam which is being monitored as part of Ontario Power Generation's Dam Safety Program. It described the deformations that have been observed in this 3600 ft long earthfill dam which lies on marine clay in eastern Ontario. An extensive instrumentation program, including foundation settlement gauges, surface monuments, slope inclinometers, load cells and piezometers has been in effect since the construction of the dam in 1975. Significant settlement has occurred at Waba Dam since its construction. Wide berms were provided upstream and downstream beyond the slopes of the main fill to ensure stability of the dyke on the soft clay foundation and the crest elevations were designed to allow for the expected settlement in the foundation which would be overstressed by the dam loading. Based on current settlements, future settlements are predicted based on Asaoka's method. Inclinometer measurements have shown a foundation lateral spreading of 12 in. The lateral versus vertical deformations were found to be comparable to well behaving embankments reported in the literature. These analyses indicate that Waba Dam is performing well and should continue to perform well into the future. 8 refs., 1 tab., 14 figs.

  19. Public safety around dams guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Canadian Dam Association, Edmonton, AB (Canada)

    2010-07-01

    This presentation discussed Canadian and international initiatives for improving dam safety and described some of the drivers for the development of new Canadian Dam Association (CDA) public safety guidelines for dams. The CDA guidelines were divided into the following 3 principal sections: (1) managed system elements, (2) risk assessment and management, and (3) technical bulletins. Public and media responses to the drownings have called for improved safety guidelines. While the public remains unaware of the hazards of dams, public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. Guidelines are needed for dam owners in order to provide due diligence. Various organizations in Canada are preparing technical and public safety dam guidelines. CDA guidelines have also been prepared for signage, booms and buoys, and audible and visual alerts bulletins. Working groups are also discussing recommended practices for spill procedures, spillways and the role of professional engineers in ensuring public safety. Methods of assessing risk were also reviewed. Managed system elements for risk assessment and public interactions were also discussed, and stepped control measures were presented. tabs., figs.

  20. Temporary Restoration of Bull Trout Passage at Albeni Falls Dam

    Energy Technology Data Exchange (ETDEWEB)

    Paluch, Mark; Scholz, Allan; McLellan, Holly [Eastern Washington University Department of Biology; Olson, Jason [Kalispel Tribe of Indians Natural Resources Department

    2009-07-13

    This study was designed to monitor movements of bull trout that were provided passage above Albeni Falls Dam, Pend Oreille River. Electrofishing and angling were used to collect bull trout below the dam. Tissue samples were collected from each bull trout and sent to the U. S. Fish and Wildlife Service Abernathy Fish Technology Center Conservation Genetics Lab, Washington. The DNA extracted from tissue samples were compared to a catalog of bull trout population DNA from the Priest River drainage, Lake Pend Oreille tributaries, and the Clark Fork drainage to determine the most probable tributary of origin. A combined acoustic radio or radio tag was implanted in each fish prior to being transported and released above the dam. Bull trout relocated above the dam were able to volitionally migrate into their natal tributary, drop back downstream, or migrate upstream to the next dam. A combination of stationary radio receiving stations and tracking via aircraft, boat, and vehicle were used to monitor the movement of tagged fish to determine if the spawning tributary it selected matched the tributary assigned from the genetic analysis. Seven bull trout were captured during electrofishing surveys in 2008. Of these seven, four were tagged and relocated above the dam. Two were tagged and left below the dam as part of a study monitoring movements below the dam. One was immature and too small at the time of capture to implant a tracking tag. All four fish released above the dam passed by stationary receivers stations leading into Lake Pend Oreille and no fish dropped back below the dam. One of the radio tags was recovered in the tributary corresponding with the results of the genetic test. Another fish was located in the vicinity of its assigned tributary, which was impassable due to low water discharge at its mouth. Two fish have not been located since entering the lake. Of these fish, one was immature and not expected to enter its natal tributary in the fall of 2008. The other

  1. Proceedings of the Canadian Dam Association's 2006 annual conference: dams: past, present and future

    International Nuclear Information System (INIS)

    2006-01-01

    This conference addressed particular technical challenges regarding the operation of dams with particular focus on best practices for improving dam management and safety. It featured 4 workshops and a technical program led by experts on dams and tailings facilities that addressed topics such as dam construction, design and rehabilitation; dam management in a hydrological uncertainty context; monitoring, instrumentation and maintenance; dam behaviour; dam safety, dam failure and practical approaches to emergency preparedness planning for dam owners; historical aspects and environmental issues and conflicting water use. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and dam safety guidelines for extreme flood analyses and their applications. All 80 presentations from this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  2. Books Received

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education. Books Received. Articles in Resonance – Journal of Science Education. Volume 1 Issue 1 January 1996 pp 118-118 Books Received. Books Received · More Details Fulltext PDF. Volume 1 Issue 2 February 1996 pp 120-120 Books Received. Books Received.

  3. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Dam safety. 1724.55 Section 1724.55 Agriculture... § 1724.55 Dam safety. (a) The provisions of this section apply only to RUS financed electric system... for Dam Safety,”(Guidelines), as applicable. A dam, as more fully defined in the Guidelines, is...

  4. Quantifying the role of Trojan dams in the between-herd spread of bovine viral diarrhoea virus (BVDv) in Ireland.

    Science.gov (United States)

    Reardon, Fiona; Graham, David A; Clegg, Tracy A; Tratalos, Jamie A; O'Sullivan, Padraig; More, Simon J

    2018-04-01

    A compulsory national programme to eradicate bovine viral diarrhoea virus (BVDv) began in Ireland on 1 January, 2013. The objective of the current study was to quantify the role of Trojan dams (animal(s) not persistently infected (PI) with BVDv but carrying PI foetus(es) and introduced to the herd while pregnant with the PI foetus(es)) in the farm-to-farm spread of BVDv in Ireland, and to identify herd-level risk factors for producing or introducing a Trojan dam. The study population included all BVD+ calves born in Ireland between 1 January, 2013 and 31 December, 2015, along with their dams. BVD+ calves included all calves on the national programme database with an initial positive or inconclusive virus test, without a confirmatory re-test (status BVDPOS) and those with an initial positive or inconclusive test and a positive confirmatory test (status BVDPI). The Trojan status of dams was determined after considering their history of movement and of potential BVDV exposure, relative to a defined window of susceptibility (WOS; days 30-120 of gestation). During 2013-15, there were 29,422 BVD+ birth events to dams that were not themselves BVD+, including 2526 (8.6%) most-likely attributable to Trojan dams. The percentage of these birth events attributable to Trojan dams was significantly different (P Trojan dam. In 2014 and 2015, the percentages were 11.8% and 13.3%, respectively. In 2013, in 7.8% of herds with one or more BVD+ birth to non-BVD+ dams, all of these births were attributable to Trojan dams. In 2014 and 2015, the percentages were 9.2% and 10.7%, respectively. A logistic GEE regression identified dam parity, herd size and an interaction between herd type and season as significant predictors for the birth of a BVD+ calf to a Trojan dam. Significant predictors for the sale of a Trojan dam from BVD+ herds included those selling more than one pregnant female and those with more than 2 BVD+ animals in the herd. Introduction of pregnant adult females is a

  5. Perspectives on dam safety in Canada

    International Nuclear Information System (INIS)

    Halliday, R.

    2004-01-01

    Canadian dam safety issues were reviewed from the perspective of a water resources engineer who is not a dam safety practitioner. Several external factors affecting dam safety were identified along with perceived problems in dam safety administration. The author claims that the main weakness in safety practices can be attributed to provincial oversights and lack of federal engagement. Some additions to the Canadian Dam Safety Guidelines were proposed to address these weaknesses. Canada has hundreds of large dams and high hazard dams whose failure would result in severe downstream consequences. The safety of dams built on boundary waters shared with the United States have gained particular attention from the International Joint Commission. This paper also examined safety criteria for concerns such as aging dams, sabotage and global climate change that may compromise the safety of a dam. 26 refs

  6. Dams and Levees: Safety Risks

    Science.gov (United States)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the

  7. Grouting Applications in Cindere Dam

    Directory of Open Access Journals (Sweden)

    Devrim ALKAYA

    2011-01-01

    Full Text Available Grouting is one of the most popular method to control the water leakage in fill dam constructions. With this regard this method is widely used in all the world. Geological and geotechnical properties of rock are important parameters affect the design of grouting. In this study, geotechnical properties of Cindere Dam's base rock and the grouting prosedure have been investigated with grouting pressure.

  8. Ririe Dam Release Test Assessment

    Science.gov (United States)

    2013-06-01

    Notes HEC - RAS Location Station (ft) Observation Notes 1420 Ririe Dam Ririe Dam 119,880 Gates opened and initial release started. 1455 115th St...16°F air temperature. Table A2. Observations made on 11 February 2013. Time Location Notes HEC - RAS Location Station (ft) Observation Notes...ERDC/CRREL TR-13-10 52 Time Location Notes HEC - RAS Location Station (ft) Observation Notes Travel Time* (sec) Vel.** (fps) 1224 5th

  9. Anaemia in HIV-infected pregnant women receiving triple antiretroviral combination therapy for prevention of mother-to-child transmission: a secondary analysis of the Kisumu breastfeeding study (KiBS).

    Science.gov (United States)

    Odhiambo, Collins; Zeh, Clement; Angira, Frank; Opollo, Valarie; Akinyi, Brenda; Masaba, Rose; Williamson, John M; Otieno, Juliana; Mills, Lisa A; Lecher, Shirley Lee; Thomas, Timothy K

    2016-03-01

    The prevalence of anaemia during pregnancy is estimated to be 35-75% in sub-Saharan Africa and is associated with an increased risk of maternal mortality. We evaluated the frequency and factors associated with anaemia in HIV-infected women undergoing antiretroviral (ARV) therapy for prevention of mother-to-child transmission (PMTCT) enrolled in The Kisumu Breastfeeding Study 2003-2009. Maternal haematological parameters were monitored from 32 to 34 weeks of gestation to 2 years post-delivery among 522 enrolled women. Clinical and laboratory assessments for causes of anaemia were performed, and appropriate management was initiated. Anaemia was graded using the National Institutes of Health Division of AIDS 1994 Adult Toxicity Tables. Data were analysed using SAS software, v 9.2. The Wilcoxon two-sample rank test was used to compare groups. A logistic regression model was fitted to describe the trend in anaemia over time. At enrolment, the prevalence of any grade anaemia (Hb anaemia (Hb anaemia events occurred around delivery (48.8%; n = 20). Anaemia (Hb ≥ 7 and anaemia at delivery (OR 5.87; 95% CI: 4.48, 7.68, P anaemia coincided with clinical malaria (24.4%; n = 10) and helminth (7.3%; n = 3) infections. Resolution of anaemia among most participants during study follow-up was likely related to receipt of ARV therapy. Efforts should be geared towards addressing common causes of anaemia in HIV-infected pregnant women, prioritising initiation of ARV therapy and management of peripartum blood loss. © 2016 John Wiley & Sons Ltd.

  10. Sediment trapping by dams creates methane emission hot spots

    DEFF Research Database (Denmark)

    Maeck, A.; Delsontro, T.; McGinnis, Daniel F.

    2013-01-01

    Inland waters transport and transform substantial amounts of carbon and account for similar to 18% of global methane emissions. Large reservoirs with higher areal methane release rates than natural waters contribute significantly to freshwater emissions. However, there are millions of small dams...... worldwide that receive and trap high loads of organic carbon and can therefore potentially emit significant amounts of methane to the atmosphere. We evaluated the effect of damming on methane emissions in a central European impounded river. Direct comparison of riverine and reservoir reaches, where...... sedimentation in the latter is increased due to trapping by dams, revealed that the reservoir reaches are the major source of methane emissions (similar to 0.23 mmol CH4 m(-2) d(-1) vs similar to 19.7 mmol CH4 m(-2) d(-1), respectively) and that areal emission rates far exceed previous estimates for temperate...

  11. A Neospora caninum vaccine using recombinant proteins fails to prevent foetal infection in pregnant cattle after experimental intravenous challenge.

    Science.gov (United States)

    Hecker, Yanina P; Cóceres, Verónica; Wilkowsky, Silvina E; Jaramillo Ortiz, José M; Morrell, Eleonora L; Verna, Andrea E; Ganuza, Agustina; Cano, Dora B; Lischinsky, Lilian; Angel, Sergio O; Zamorano, Patricia; Odeón, Anselmo C; Leunda, María R; Campero, Carlos M; Morein, Bror; Moore, Dadín P

    2014-12-15

    The aim of the present study was to evaluate the immunogenicity and protective efficacy of rNcSAG1, rNcHSP20 and rNcGRA7 recombinant proteins formulated with immune stimulating complexes (ISCOMs) in pregnant heifers against vertical transmission of Neospora caninum. Twelve pregnant heifers were divided into 3 groups of 4 heifers each, receiving different formulations before mating. Immunogens were administered twice subcutaneously: group A animals were inoculated with three recombinant proteins (rNcSAG1, rNcHSP20, rNcGRA7) formulated with ISCOMs; group B animals received ISCOM-MATRIX (without antigen) and group C received sterile phosphate-buffered saline (PBS) only. The recombinant proteins were expressed in Escherichia coli and purified nickel resin. All groups were intravenously challenged with the NC-1 strain of N. caninum at Day 70 of gestation and dams slaughtered at week 17 of the experiment. Heifers from group A developed specific antibodies against rNcSAG1, rNcHSP20 and rNcGRA7 prior to the challenge. Following immunization, an statistically significant increase of antibodies against rNcSAG1 and rNcHSP20 in all animals of group A was detected compared to animals in groups B and C at weeks 5, 13 and 16 (P0.001). There were no differences in IFN-γ production among the experimental groups at any time point (P>0.05). Transplacental transmission was determined in all foetuses of groups A, B and C by Western blot, immunohistochemistry and nested PCR. This work showed that rNcSAG1, rNcHSP20 and rNcGRA7 proteins while immunogenic in cattle failed to prevent the foetal infection in pregnant cattle challenged at Day 70 of gestation. Copyright © 2014 Elsevier B.V. All rights reserved.

  12. The effect of androgen excess on maternal metabolism, placental function and fetal growth in obese dams.

    Science.gov (United States)

    Fornes, Romina; Maliqueo, Manuel; Hu, Min; Hadi, Laila; Jimenez-Andrade, Juan M; Ebefors, Kerstin; Nyström, Jenny; Labrie, Fernand; Jansson, Thomas; Benrick, Anna; Stener-Victorin, Elisabet

    2017-08-14

    Pregnant women with polycystic ovary syndrome (PCOS) are often overweight or obese. To study the effects of maternal androgen excess in obese dams on metabolism, placental function and fetal growth, female C57Bl6J mice were fed a control (CD) or a high fat/high sucrose (HF/HS) diet for 4-10 weeks, and then mated. On gestational day (GD) 15.5-17.5, dams were injected with dihydrotestosterone (CD-DHT, HF/HS-DHT) or a vehicle (CD-Veh, HF/HS-Veh). HF/HS dams had higher fat content, both before mating and on GD18.5, with no difference in glucose homeostasis, whereas the insulin sensitivity was higher in DHT-exposed dams. Compared to the CD groups, the livers from HF/HS dams weighed more on GD18.5, the triglyceride content was higher, and there was a dysregulation of liver enzymes related to lipogenesis and higher mRNA expression of Fitm1. Fetuses from HF/HS-Veh dams had lower liver triglyceride content and mRNA expression of Srebf1c. Maternal DHT exposure, regardless of diet, decreased fetal liver Pparg mRNA expression and increased placental androgen receptor protein expression. Maternal diet-induced obesity, together with androgen excess, affects maternal and fetal liver function as demonstrated by increased triglyceride content and dysfunctional expression of enzymes and transcription factors involved in de novo lipogenesis and fat storage.

  13. Trading river services: optimizing dam decisions at the basin scale to improve socio-ecological resilience

    Science.gov (United States)

    Roy, S. G.; Gold, A.; Uchida, E.; McGreavy, B.; Smith, S. M.; Wilson, K.; Blachly, B.; Newcomb, A.; Hart, D.; Gardner, K.

    2017-12-01

    Dam removal has become a cornerstone of environmental restoration practice in the United States. One outcome of dam removal that has received positive attention is restored access to historic habitat for sea-run fisheries, providing a crucial gain in ecosystem resilience. But dams also provide stakeholders with valuable services, and uncertain socio-ecological outcomes can arise if there is not careful consideration of the basin scale trade offs caused by dam removal. In addition to fisheries, dam removals can significantly affect landscape nutrient flux, municipal water storage, recreational use of lakes and rivers, property values, hydroelectricity generation, the cultural meaning of dams, and many other river-based ecosystem services. We use a production possibility frontiers approach to explore dam decision scenarios and opportunities for trading between ecosystem services that are positively or negatively affected by dam removal in New England. Scenarios that provide efficient trade off potentials are identified using a multiobjective genetic algorithm. Our results suggest that for many river systems, there is a significant potential to increase the value of fisheries and other ecosystem services with minimal dam removals, and further increases are possible by including decisions related to dam operations and physical modifications. Run-of-river dams located near the head of tide are often found to be optimal for removal due to low hydroelectric capacity and high impact on fisheries. Conversely, dams with large impoundments near a river's headwaters can be less optimal for dam removal because their value as nitrogen sinks often outweighs the potential value for fisheries. Hydropower capacity is negatively impacted by dam removal but there are opportunities to meet or exceed lost capacity by upgrading preserved hydropower dams. Improving fish passage facilities for dams that are critical for safety or water storage can also reduce impacts on fisheries. Our

  14. Public safety risk management at socio-economic and / or historic-cultural significant dam sites

    Energy Technology Data Exchange (ETDEWEB)

    Earle, Gordon D.; Ryan, Katherine; Pyykonen, Nicole K.; Pitts, Lucas [Otonabee Region Conservation Authority, Peterborough, (Canada)

    2010-07-01

    The Lang Dam and adjoining gristmill, located near Peterborough are integral parts of the Lang Pioneer Village museum. Activities occurring within close proximity to the dam have led to safety issues. The owner (ORCA) has developed and implemented public safety management plans (PSMPs) for each of its water control structures, including the Lang Dam. ORCA gave special attention to the social, economic, aesthetic, historic and cultural dimensions associated the implementation of public safety management plans. These factors play a significant role in how well public safety measures (PSMs) are received by stakeholder groups and the general public. This paper reported the challenges of developing and implementing a PSMP for the Lang Dam, with the focus on property site-specific PSMS while preserving socio-economic and historic-cultural character and values. It was demonstrated that the dam owners, regulatory authorities, control agencies and preservationists need to come together to develop a holistic public safety management process.

  15. Oxidative stress and mitochondrial dysfunction in infected pregnant

    Directory of Open Access Journals (Sweden)

    Нана Мерабівна Пасієшвілі

    2015-04-01

    Full Text Available The infected pregnant women have been various perinatal complications. The aim of the work was to clarify the role of oxidative stress and mitochondrial dysfunction in the development of perinatal complications in infected pregnant.Methods. The study included 68 pregnant women with signs of maternal-fetal infection (MFI and 30 pregnant women who were found infected (control group. Later pregnant with MFI were divided into 2 groups: the first included 30 women who received traditional antibacterial and antiviral therapy, the second group consisted of 28 women who were additionally given an immunomodulator in combination with ozone therapy.Results. During pregnancy with MFI it is characterized the thrombophilic disorders, break immune homeostasis pregnant, endothelial dysfunction, which adversely affects perinatal indicators.Conclusions. The use of immunomodulators and ozone therapy in the complex treatment of MFI is pathogenetically substantiated effective treatment of oxidative stress and mitochondrial toxicity in the prevention of perinatal complications in infected women

  16. The homeless pregnant woman.

    Science.gov (United States)

    Esen, Umo I

    2017-09-01

    Women who are pregnant and homeless constitute a unique group at significant risk of adverse foetal and maternal outcomes. Despite this heightened risk profile, social housing support to this group of women is less than satisfactory. Concerted effort and more collaborative working is needed by all who provide social, and healthcare services to homeless pregnant women, to improve the lot of these women. Clear definitions and legislative provisions in respect of the homeless will go a long way in reducing ambiguity and close loopholes which currently act to deny the homeless pregnant woman social housing support at a time when it is most needed.

  17. Dams and Obstructions along Iowa's Canoe Routes

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — This dataset represents obstruction to canoe and boat users of the canoe routes of Iowa. This may represent actual dams, rock dams (natural or man made), large...

  18. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  19. Simulation of Breach Outflow for Earthfill Dam

    International Nuclear Information System (INIS)

    Razad, Azwin Zailti Abdul; Muda, Rahsidi Sabri; Sidek, Lariyah Mohd; Azia, Intan Shafilah Abdul; Mansor, Faezah Hanum; Yalit, Ruzaimei

    2013-01-01

    Dams have been built for many reasons such as irrigation, hydropower, flood mitigation, and water supply to support development for the benefit of human. However, the huge amount of water stored behind the dam can seriously pose adverse impacts to the downstream community should it be released due to unwanted dam break event. To minimise the potential loss of lives and property damages, a workable Emergency Response Plan is required to be developed. As part of a responsible dam owner and operator, TNB initiated a study on dam breach modelling for Cameron Highlands Hydroelectric Scheme to simulate the potential dam breach for Jor Dam. Prediction of dam breach parameters using the empirical equations of Froehlich and Macdonal-Langridge-Monopolis formed the basis of the modelling, coupled with MIKE 11 software to obtain the breach outflow due to Probable Maximum Flood (PMF). This paper will therefore discuss the model setup, simulation procedure and comparison of the prediction with existing equations.

  20. Technical bulletin : structural considerations for dam safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This technical bulletin discussed issues related to the safety assessment of concrete water-retaining structures and timber dams. Structures reviewed in the paper included gravity dams; buttress dams; arch dams; spillway structures; intake structures; power plants; roller compacted concrete dams; and timber dams. A variety of issues related to the loss of cohesive bond and discontinuities in bedrock foundations were reviewed with reference to issues related to compressive strength, tensile strength, and shear strength. Static failure modes and failure mechanisms related to dam failures were also described. Visual indicators for potential failures include abutment and foundation movement, seepage, and structure movements. Loading combinations were discussed, and performance indicators for gravity dams were provided. Methods of analysis for considering load characteristics, structure types and geological conditions were also discussed. Modelling techniques for finite element analysis were also included. 16 refs., 3 tabs., 5 figs.

  1. Pregnant women's attitudes toward influenza vaccination while breastfeeding

    Directory of Open Access Journals (Sweden)

    Jessica R. Gorman

    2015-01-01

    Conclusions: Pregnant women and postpartum women who are breastfeeding could benefit from receiving information and recommendations specific to vaccination from their healthcare providers, with a focus on discussing known risks and benefits to the baby's health.

  2. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  3. Statistical characteristics and stability index (si) of large-sized landslide dams around the world

    International Nuclear Information System (INIS)

    Iqbal, J.; Dai, F.; Raja, I.A.

    2014-01-01

    In the last few decades, landslide dams have received greater attention of researchers, as they have caused loss to property and human lives. Over 261 large-sized landslide dams from different countries of the world with volume greater than 1 x 105 m have been reviewed for this study. The data collected for this study shows that 58% of the catastrophic landslides were triggered by earthquakes and 21 % by rainfall, revealing that earthquake and rainfall are the two major triggers, accounting for 75% of large-sized landslide dams. These land-slides were most frequent during last two decades (1990-2010) throughout the world. The mean landslide dam volume of the studied cases was 53.39 x 10 m with mean dam height of 71.98 m, while the mean lake volume was found to be 156.62 x 10 m. Failure of these large landslide dams pose a severe threat to the property and people living downstream, hence immediate attention is required to deal with this problem. A stability index (SI) has been derived on the basis on 59 large-sized landslide dams (out of the 261 dams) with complete parametric information. (author)

  4. WinDAM C earthen embankment internal erosion analysis software

    Science.gov (United States)

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  5. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  6. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  7. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  8. Toxoplasmosis and Pregnant Women

    Science.gov (United States)

    ... and General Public. Contact Us Parasites Home Pregnant Women Recommend on Facebook Tweet Share Compartir On this ... my unborn child against toxoplasmosis? Cat owners and women who are exposed to cats should follow the ...

  9. Travelers' Health: Pregnant Travelers

    Science.gov (United States)

    ... severe dehydration, chronic malabsorption resulting in fetal growth restriction, and in the case of E. histolytica , invasive disease, including amebic liver abscess and colitis. Pregnant women should avoid swimming or wading in freshwater lakes, ...

  10. Diversity receiver

    NARCIS (Netherlands)

    2005-01-01

    The invention is directed to the reception of high rate radio signals (for example DVB-T signals) while the receiver is moving at a high speed (for example in or with a car). Two or more antennas (12, 16) are closely spaced and arranged behind each other in the direction of motion (v) for receiving

  11. Dam's design continues throughout construction

    Energy Technology Data Exchange (ETDEWEB)

    Lara E, R; Wulff, J G

    1979-11-01

    In spite of adverse site conditions, Arenal dam in Costa Rica was completed a year ahead of schedule. Historical data on local earthquake activity which was available in unusual detail reduced some uncertainties in design information. Other uncertainties regarding the complex foundation conditions were resolved as excavation and construction progressed.

  12. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  13. Assessing Risks of Mine Tailing Dam Failures

    Science.gov (United States)

    Concha Larrauri, P.; Lall, U.

    2017-12-01

    The consequences of tailings dam failures can be catastrophic for communities and ecosystems in the vicinity of the dams. The failure of the Fundão tailings dam at the Samarco mine in 2015 killed 19 people with severe consequences for the environment. The financial and legal consequences of a tailings dam failure can also be significant for the mining companies. For the Fundão tailings dam, the company had to pay 6 billion dollars in fines and twenty-one executives were charged with qualified murder. There are tenths of thousands of active, inactive, and abandoned tailings dams in the world and there is a need to better understand the hazards posed by these structures to downstream populations and ecosystems. A challenge to assess the risks of tailings dams in a large scale is that many of them are not registered in publicly available databases and there is little information about their current physical state. Additionally, hazard classifications of tailings dams - common in many countries- tend to be subjective, include vague parameter definitions, and are not always updated over time. Here we present a simple methodology to assess and rank the exposure to tailings dams using ArcGIS that removes subjective interpretations. The method uses basic information such as current dam height, storage volume, topography, population, land use, and hydrological data. A hazard rating risk was developed to compare the potential extent of the damage across dams. This assessment provides a general overview of what in the vicinity of the tailings dams could be affected in case of a failure and a way to rank tailings dams that is directly linked to the exposure at any given time. One hundred tailings dams in Minas Gerais, Brazil were used for the test case. This ranking approach could inform the risk management strategy of the tailings dams within a company, and when disclosed, it could enable shareholders and the communities to make decisions on the risks they are taking.

  14. Research on Safety Factor of Dam Slope of High Embankment Dam under Seismic Condition

    Directory of Open Access Journals (Sweden)

    Li Bin

    2015-01-01

    Full Text Available With the constant development of construction technology of embankment dam, the constructed embankment dam becomes higher and higher, and the embankment dam with its height over 200m will always adopt the current design criteria of embankment dam only suitable for the construction of embankment dam lower than 200m in height. So the design criteria of high embankment dam shall be improved. We shall calculate the stability and safety factors of dam slope of high embankment dam under different dam height, slope ratio and different seismic intensity based on ratio of safety margin, and clarify the change rules of stability and safety factors of dam slope of high embankment dam with its height over 200m. We calculate the ratio of safety margin of traditional and reliable method by taking the stable, allowable and reliability index 4.2 of dam slope of high embankment dam with its height over 200m as the standard value, and conduct linear regression for both. As a result, the conditions, where 1.3 is considered as the stability and safety factors of dam slope of high embankment dam with its height over 200m under seismic condition and 4.2 as the allowable and reliability index, are under the same risk control level.

  15. New guidelines for dam safety classification

    International Nuclear Information System (INIS)

    Dascal, O.

    1999-01-01

    Elements are outlined of recommended new guidelines for safety classification of dams. Arguments are provided for the view that dam classification systems should require more than one system as follows: (a) classification for selection of design criteria, operation procedures and emergency measures plans, based on potential consequences of a dam failure - the hazard classification of water retaining structures; (b) classification for establishment of surveillance activities and for safety evaluation of dams, based on the probability and consequences of failure - the risk classification of water retaining structures; and (c) classification for establishment of water management plans, for safety evaluation of the entire project, for preparation of emergency measures plans, for definition of the frequency and extent of maintenance operations, and for evaluation of changes and modifications required - the hazard classification of the project. The hazard classification of the dam considers, as consequence, mainly the loss of lives or persons in jeopardy and the property damages to third parties. Difficulties in determining the risk classification of the dam lie in the fact that no tool exists to evaluate the probability of the dam's failure. To overcome this, the probability of failure can be substituted for by a set of dam characteristics that express the failure potential of the dam and its foundation. The hazard classification of the entire project is based on the probable consequences of dam failure influencing: loss of life, persons in jeopardy, property and environmental damage. The classification scheme is illustrated for dam threatening events such as earthquakes and floods. 17 refs., 5 tabs

  16. Research on shape optimization of CSG dams

    Directory of Open Access Journals (Sweden)

    Xin Cai

    2011-12-01

    Full Text Available The multi-objective optimization method was used for shape optimization of cement sand and gravel (CSG dams in this study. The economic efficiency, the sensitivities of maximum horizontal displacement and maximum settlement of the dam to water level changes, the overall stability, and the overall strength security were taken into account during the optimization process. Three weight coefficient selection schemes were adopted to conduct shape optimization of a dam, and the case studies lead to the conclusion that both the upstream and downstream dam slope ratios for the optimal cross-section equal 1:0.7, which is consistent with the empirically observed range of 1:0.6 to 1:0.8 for the upstream and downstream dam slope ratios of CSG dams. Therefore, the present study is of certain reference value for designing CSG dams.

  17. Dynamic tests at the Outardes 3 dam

    International Nuclear Information System (INIS)

    Proulx, J.; Paultre, P.; Duron, Z.; Tai Mai Phat; Im, O.

    1992-01-01

    At the Outardes 3 gravity dam, part of the Manicouagan-Outardes hydroelectric complex in northeastern Quebec, forced vibration tests were carried out using an eccentric mass shaker attached to the dam crest at three different locations. Accelerations were measured along the crest and in the inspection galleries, and hydrodynamic pressures were measured along the upstream dam face and at various locations in the reservoir. The tests were designed to analyze the effects of gravity dam-reservoir interactions and to generate a data base for calibrating finite element models used in studying the dynamic behavior of gravity dams. Experimental results are presented in order to demonstrate the quality of the data obtained and the effectiveness of the experimental procedures. Modes of vibration were observed which corresponded to those obtained by finite element analysis. It is shown that techniques recently developed for dynamic tests on large dams can be successfully used on gravity dams. 3 refs., 6 figs

  18. Toward improved design of check dam systems: A case study in the Loess Plateau, China

    Science.gov (United States)

    Pal, Debasish; Galelli, Stefano; Tang, Honglei; Ran, Qihua

    2018-04-01

    Check dams are one of the most common strategies for controlling sediment transport in erosion prone areas, along with soil and water conservation measures. However, existing mathematical models that simulate sediment production and delivery are often unable to simulate how the storage capacity of check dams varies with time. To explicitly account for this process-and to support the design of check dam systems-we developed a modelling framework consisting of two components, namely (1) the spatially distributed Soil Erosion and Sediment Delivery Model (WaTEM/SEDEM), and (2) a network-based model of check dam storage dynamics. The two models are run sequentially, with the second model receiving the initial sediment input to check dams from WaTEM/SEDEM. The framework is first applied to Shejiagou catchment, a 4.26 km2 area located in the Loess Plateau, China, where we study the effect of the existing check dam system on sediment dynamics. Results show that the deployment of check dams altered significantly the sediment delivery ratio of the catchment. Furthermore, the network-based model reveals a large variability in the life expectancy of check dams and abrupt changes in their filling rates. The application of the framework to six alternative check dam deployment scenarios is then used to illustrate its usefulness for planning purposes, and to derive some insights on the effect of key decision variables, such as the number, size, and site location of check dams. Simulation results suggest that better performance-in terms of life expectancy and sediment delivery ratio-could have been achieved with an alternative deployment strategy.

  19. Selection of tolerable risk criteria for dam safety decision making

    International Nuclear Information System (INIS)

    Nielsen, N.M.; Hartford, D.N.D.; MacDonald, T.F.

    1994-01-01

    Risk assessment has received increasing attention in recent years as a means of aiding decision making on dams by providing systematic and rational methods for dealing with risk and uncertainty. Risk assessment is controversial and decisions affecting risk to life are the most controversial. Tolerable criteria, based on the risks that society is prepared to accept in order to avoid excessive costs, set bounds within which risk-based decisions may be made. The components of risk associated with dam safety are addressed on an individual basis and criteria established for each component, thereby permitting flexibility in the balance between component risk and avoiding the problems of placing a monetary value on life. The guiding principle of individual risk is that dams do not impose intolerable risks on any individual. A risk to life of 1 in 10 4 per annum is generally considered the maximum tolerable risk. When considering societal risk, the safety of a dam should be proportional to the consequences of its failure. Risks of financial losses beyond the corporation's ability to finance should be so low as to be considered negligible. 17 refs., 3 figs

  20. Proceedings of the 2010 Canadian Dam Association's public safety around dams workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Nearly 30 people have drowned in dam-related incidents over the last 10 years in Canada. The Canadian public is now calling for improved safety guidelines. Public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. However, many members of the public are not aware of the dangers posed by dams. This workshop provided a forum to discuss proposals for a draft publication of the Canadian Dam Association (CDA) guidelines for public safety and security around dams. Issues related to current legislation and liability were discussed. Methods of increasing public awareness of the hazards posed by dams included increased signage in dam locations, the use of audible and visual alert systems, and the use of booms and buoys. The responsibilities of dam owners in ensuring the safety of dams were also discussed. The conference featured 5 presentations, of which 2 have been catalogued separately for inclusion in this database. tabs., figs.

  1. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  2. Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam safety management into the next millenium; 6 - rehabilitation techniques: the unconventional application of conventional materials; nondestructive testing technology to characterize concrete dam/bedrock interface; method and instrument for detecting crack in concrete; and grouting of the cracks in the Arch 5-6 - Daniel Johnson Dam; and 7 - case studies: rehabilitation of an 80 year old Ambursen type dam; and debris booms for the protection of spillways.

  3. Crotch Lake dam rehabilitation project

    International Nuclear Information System (INIS)

    Brunet, G.; Dobrowolski, E.

    1999-01-01

    Replacement of the existing wood crib dam structure on Crotch Lake on the Mississippi River in eastern Ontario that provided water storage for the power production at High Falls Generating Station, became necessary when it was determined that the dam did not meet Ontario-Hydro's safety standards. This paper describes the project of replacing the existing structure with a PVC coated gabion wall with waterproofing. The entire structure was covered with three layers of wire mesh, laced together, and criss-crossed for superior strength and rigidity. The work was completed in 28 days with no environmental impact . Life expectancy of the new structure is in excess of 40 years. With periodic maintenance of the gabion mat cover, life span could be extended an additional 20 to 40 years. 5 figs

  4. Coupled models in dam engineering

    OpenAIRE

    González Gutiérrez, María De Los Ángeles

    2016-01-01

    Rock ll dams are certainly one of the most important engineering structures due to their economic advantages and exible design. Unfortunately their vulnerability to overtopping still remains their weakest point. For that reason, several research groups are interested in both the numerical and experimental analysis of this phenomenon. In this work we focused on the numerical analysis. The previous work developed in CIMNE on a coupled PFEM-Eulerian free surface Compu- tational...

  5. Environmental monitoring at Olympic Dam

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The environmental management and protection program at the Olympic Dam uranium/copper/gold project, Roxby Downs, South Australia, monitors eight major environmental parameters - meteorology, vegetation, mine site rehabilitation, fauna, terrain, soil salinity, hydrogeology and well fields. It came into effect with the approval of the South Australian Government in March 1987. The Great Artesian Basin, one of the world's greatest artesian basins, is the source of the water supply for the project

  6. Perceptions of pregnant adolescents on the antenatal care received ...

    African Journals Online (AJOL)

    2018-03-25

    Mar 25, 2018 ... women because of the low self-esteem and stigma associated .... School again will help you to look young because when you give birth to three or four babies .... and older women delay seeking antenatal care14,17,18,21,26.

  7. Mitigating Dam Impacts Using Environmental Flow Releases

    Science.gov (United States)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible

  8. Investigations into the prevention of prenatal and lactogenic Toxocara canis infections in puppies by application of moxidectin to the pregnant dog.

    Science.gov (United States)

    Krämer, F; Hammerstein, R; Stoye, M; Epe, C

    2006-06-01

    Aim of the investigation was to examine whether two administrations of moxidectin to pregnant dogs could prevent pre-natal and lactogenic infections of puppies with reactivated Toxocara canis larvae. Four pregnant beagles, infected experimentally with 20 000 embryonated eggs of T. canis, were treated subcutaneously with 1 mg moxidectin per kg body weight on days 40 and 55 of pregnancy (5-13 days before parturition). One further dam and its puppies served as untreated control. Two applications of moxidectin completely prevented pre-natal and lactogenic infections in the puppies. Neither intestinal stages nor somatic larvae were found in the dams or their corresponding puppies. All puppies and dams of the treatment group remained coproscopically negative until 42 days after parturition. The administration of moxidectin did not show any side effects in the dams. None of the puppies of the treated dams showed any pathological abnormalities. In the untreated dam one adult and 26 somatic larvae of T. canis were detected at necropsy. All puppies of the untreated dam showed a patent T. canis infection from day 28 post-natum (p.n.); 296 pre-adult and adult stages of T. canis were spontaneously eliminated and 51 intestinal stages and five somatic larvae of T. canis were recovered at necropsy. In contrast to the puppies of the treated dams all negative control puppies showed blood eosinophilia after parturition and elevated liver enzyme levels.

  9. Biochemical Profiles of Pregnant and Non-pregnant Women ...

    African Journals Online (AJOL)

    2018-05-01

    May 1, 2018 ... RESULT: Pregnant women as compared to non-pregnant had significantly increased .... addition, study participants who were smokers, drinkers and chewers of ..... physiology. a clinical perspective 4th ed. Maryland Heights ...

  10. Investigations into the prevention of neonatal Ancylostoma caninum infections in puppies by application of imidacloprid 10% plus moxidectin 2.5% topical solution to the pregnant dog.

    Science.gov (United States)

    Krämer, F; Epe, C; Mencke, N

    2009-02-01

    The aim of the investigation was to examine whether a single topical administration of a combination of imidacloprid and moxidectin to pregnant dogs could prevent neonatal infections with reactivated Ancylostoma caninum larvae. Three pregnant beagles, infected with A. caninum, were treated topically with the combination on day 56 of pregnancy. Three further dogs served as untreated controls. Treatment appeared to prevent neonatal infections in the puppies completely. Neither intestinal stages nor somatic larvae were found in two examined puppies per litter. All puppies and dams of the treatment group remained coproscopically negative. No side-effects in dams or puppies were observed. Two of three untreated dams showed a patent infection after parturition. Necropsy of two puppies of each negative control litter revealed seven intestinal and five somatic A. caninum stages in total. One litter of the untreated dams showed a patent infection 33 days after parturition. In the other two litters, no representative sample sizes could be collected.

  11. Rubber dam may increase the survival time of dental restorations.

    Science.gov (United States)

    Keys, William; Carson, Susan J

    2017-03-01

    Data sourcesCochrane Oral Health's Trials Register, Cochrane Central Register of Controlled Trials (CENTRAL), Medline, Embase, LILACS, SciELO, Chinese BioMedical Literature Database, VIP, China National Knowledge Infrastructure, ClinicalTrials.gov, World Health Organization International Clinical Trials Registry Platform, OpenGrey and Sciencepaper Online databases. Handsearches in a number of journals.Study selectionRandomised controlled trials, including split-mouth studies assessing the effects of rubber dam isolation for restorative treatments in dental patients.Data extraction and synthesisTwo review authors independently screened the results of the electronic searches, extracted data and assessed the risk of bias of the included studies.ResultsFour studies involving a total of 1,270 patients were included. The studies were at high risk of bias. One trial was excluded from the analysis due to inconsistencies in the presented data. Restorations had a significantly higher survival rate in the rubber dam isolation group compared to the cotton roll isolation group at six months in participants receiving composite restorative treatment of non-carious cervical lesions (risk ratio (RR) 1.19, 95% confidence interval (CI) 1.04 to 1.37, very low-quality evidence). The rubber dam group had a lower risk of failure at two years in children undergoing proximal atraumatic restorative treatment in primary molars (hazard ratio (HR) 0.80, 95% CI 0.66 to 0.97, very low-quality evidence). One trial reported limited data showing that rubber dam usage during fissure sealing might shorten the treatment time. None of the included studies mentioned adverse effects or reported the direct cost of the treatment, or the level of patient acceptance/satisfaction. There was also no evidence evaluating the effects of rubber dam usage on the quality of the restorations.ConclusionsWe found some very low-quality evidence, from single studies, suggesting that rubber dam usage in dental direct

  12. Three Sisters Dam modifications and performance

    Energy Technology Data Exchange (ETDEWEB)

    Courage, L.J.R. [Monenco AGRA Inc., Calgary, AB (Canada)

    1995-12-31

    Recent modifications and maintenance carried out at the Three Sisters Dam, in the Alberta Rockies south of the town of Canmore, were described. A detailed account was given of the dam`s geological setting, its abnormally high leakage through the foundation and its sinkhole activity. Results of studies aimed at finding the cause of leakage and sinkhole occurrences were reviewed. Modifications made to the dam since 1951 were detailed, as were modifications to handle probable maximum flood levels. Three approaches for estimating failure probabilities after identification of failure modes were described. The overall conclusion was that based on constant leakage, no settlement in the dam, penstocks, or the powerhouse since construction, the Three Sisters Dam was stable. 1 ref.

  13. The changing hydrology of a dammed Amazon

    Science.gov (United States)

    Timpe, Kelsie; Kaplan, David

    2017-01-01

    Developing countries around the world are expanding hydropower to meet growing energy demand. In the Brazilian Amazon, >200 dams are planned over the next 30 years, and questions about the impacts of current and future hydropower in this globally important watershed remain unanswered. In this context, we applied a hydrologic indicator method to quantify how existing Amazon dams have altered the natural flow regime and to identify predictors of alteration. The type and magnitude of hydrologic alteration varied widely by dam, but the largest changes were to critical characteristics of the flood pulse. Impacts were largest for low-elevation, large-reservoir dams; however, small dams had enormous impacts relative to electricity production. Finally, the “cumulative” effect of multiple dams was significant but only for some aspects of the flow regime. This analysis is a first step toward the development of environmental flows plans and policies relevant to the Amazon and other megadiverse river basins. PMID:29109972

  14. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  15. Pregnant Field Students' Guilt

    Science.gov (United States)

    Baum, Nehami

    2006-01-01

    This study examined guilt feelings among social work students who were pregnant for the first time during field work training. Semi-structured interviews were conducted either in the 9th month (n=5) or 2-12 months after delivery (n=5). Content analysis revealed 6 main triggers, illustrated by excerpts, which stimulated field students' guilt…

  16. Assessment of check-dam groundwater recharge with water-balance calculations

    Science.gov (United States)

    Djuma, Hakan; Bruggeman, Adriana; Camera, Corrado; Eliades, Marinos

    2017-04-01

    check-dam was estimated to be 1 million m3. Upper and lower limits of prediction intervals were computed to assess the uncertainties of the results. The model was rerun with these values and resulted in recharge values of 0.4 m3 as lower and 38 million m3 as upper limit. The sediment survey in the check-dam reservoir area showed that the reservoir area was filled with 2,000 to 3,000 tons of sediment after one rainfall season. This amount of sediment corresponds to 0.2 to 2 t h-1 y-1 sediment yield at the watershed level and reduces the check-dam storage capacity by approximately 10%. Results indicate that check-dams are valuable structures for increasing groundwater resources, but special attention should be given to soil erosion occurring in the upstream area and the resulting sediment built-up in the check-dam reservoir area. This study has received funding from the EU FP7 RECARE Project (GA 603498)

  17. Surface and subsurface soils at the Pond B dam: July 1998

    International Nuclear Information System (INIS)

    Halverson, N.V.

    1999-01-01

    Pond B, 685-13G, is an inactive reactor cooling impoundment built in 1961 on the Savannah River Site (SRS). Between 1961 and 1964, Pond B received R-Reactor cooling water discharges that were contaminated with 137 Cs, 90 Sr and plutonium. Though the pond has not been used since 1964, radionuclides from the contaminated cooling water remain in the water and in the surface sediments of the pond. The current proposal to fix and repair the Pond B dam structure includes installing a new drain system and monitoring equipment. The dam will be reinforced with additional previous material on the downstream face of the dam. The objectives of this report are to describe the sampling methodology used during the July 1998 sampling event at the downstream face of the Pond B dam and in Pond B, present the results of the sampling event, and compare, where possible, these results to related risk-based standards

  18. Dam safety management in Victoria (Australia)

    International Nuclear Information System (INIS)

    Adem, J.

    1996-01-01

    The Victoria state government's decision to make dam owners accountable for safety and upkeep of their dams was reported. To give effect to this decision a series of guidelines have been developed which outline the required activities and skills to ensure that dams are properly managed within a framework of 'light-handed' regulation. The guidelines are also intended to ensure that dam management becomes an integral part of the business decision making process, not just a set of prescribed technical procedures. Details of the direction being taken and the proposed controls to ensure compliance with national and international standards were described. 4 refs., 2 figs

  19. Numerical modelling for stability of tailings dams

    OpenAIRE

    Auchar, Muhammad; Mattsson, Hans; Knutsson, Sven

    2013-01-01

    A tailings dam is a large embankment structure that is constructed to store the waste from the mining industry. Stability problems may occur in a tailings dam due to factors such as quick rate of raising, internal erosion and liquefaction. The failure of a tailings dam may cause loss of human life and environmental degradation. Tailings Dams must not only be stable during the time the tailings storage facility is in operation, but also long time after the mine is closed. In Sweden, the licens...

  20. Brazil's Amazonian dams: Ecological and socioeconomic impacts

    Science.gov (United States)

    Fearnside, P. M.

    2016-12-01

    Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with environmental and socioeconomic impacts. Loss of forest to flooding is one, the Balbina and Tucuruí Dams being examples (each 3000 km2). If the Babaquara/Altamira Dam is built it will flood as much forest as both of these combined. Some planned dams imply loss of forest in protected areas, for example on the Tapajós River. Aquatic and riparian ecosystems are lost, including unique biodiversity. Endemic fish species in rapids on the Xingu and Tapajós Rivers are examples. Fish migrations are blocked, such as the commercially important "giant catfish" of the Madeira River. Dams emit greenhouse gases, including CO2 from the trees killed and CH4 from decay under anoxic conditions at the bottom of reservoirs. Emissions can exceed those from fossil-fuel generation, particularly over the 20-year period during which global emissions must be greatly reduced to meet 1.5-2°C limit agreed in Paris. Carbon credit for dams under the Climate Convention causes further net emission because the dams are not truly "additional." Anoxic environments in stratified reservoirs cause methylation of mercury present in Amazonian soils, which concentrates in fish, posing a health risk to human consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be

  1. Japan`s largest composition dam, aiming for harmony with nature. Chubetsu dam; Shizen tono chowa wo mezasu, Nippon ichi no fukugo dam. Chubetsu dam

    Energy Technology Data Exchange (ETDEWEB)

    Mizushima, T. [Hokkaido Development Bureau, Hokkaido Development Agency, Sapporo (Japan)

    1994-08-15

    This paper introduces Chubetsu Dam planned with a large-scale embankment having a river bed width of 600 m. Chubetsu Dam is being constructed with such objectives as flood control of Ishikari River, river flow rate maintenance, drinking water supply, irrigation water supply and power generation. The dam site is a gravel bed having a river bed width of 600 m and a maximum foundation rock thickness of 40 m, requiring evaluations as a dam foundation and discussions of water shielding methods. As a result of discussions at the Chubetsu Dam technical discussion committee, the dam type is decided to be a composition dam consisting of a gravity type concrete dam on the left river side and a central core type fill dam using a part of the gravel bed as the foundation on the right river side. A continuous underground wall system is planned to be used for shielding water in the gravel foundation. In discussing the anti-seismic properties, analyses for bank construction and water filling to derive stress and deformation conditions prior to an earthquake and a time-history response analysis to derive conditional changes during the earthquake are performed. According to the results thereof, evaluations are given on the safety by compounding the stress and the acceleration. In plans to improve the surrounding areas, an area will be provided upstream the reservoir where the water level is kept constant to serve as a bird sanctuary. 7 figs.

  2. Olympic Dam operations - environmental management programme

    International Nuclear Information System (INIS)

    1990-03-01

    This is the 3rd Annual Report pertaining to the Olympic Dam Operations Environmental Management Programme and covers the period 1st March, 1989 to 28th February, 1990. The monitoring programe has provided detailed assessment of meteorological data, vegetation, fauna, soil stability, soil salinity, hydrogeology and well-fields both inside and outside the operations area. Mine site rehabilitation is considered to be progressing satisfactorily. Out of the 851 drill pad sites 72% have been rehabilitated to the stage where natural soil stability and plant cover has been achieved. Drill pad sites that have received good rainfall within one year of being ripped have rehabilitated very succesfully. Sites that receive no significant rainfall for more than two years, particularly on dune slopes may require re-ripping before successful regeneration can occur. To improve the drill pad site rehabilitation monitoring programme it is recommended that 200 drill sites be analysed each year. Air emission and solid waste data are also presented. This program is considered to be particularly successful in relation to SO 2 assessment. 90 tabs., 63 figs., ills

  3. The Treatment of Obese Pregnant Women (TOP) study

    DEFF Research Database (Denmark)

    Renault, Kristina M; Nørgaard, Kirsten; Nilas, Lisbeth

    2014-01-01

    OBJECTIVE: The objective of the study was to assess physical activity intervention assessed by a pedometer with or without dietary intervention on gestational weight gain (GWG) in obese pregnant women by comparing with a control group. STUDY DESIGN: This study was a randomized controlled trial...... of 425 obese pregnant women comparing 3 groups: (1) PA plus D, physical activity and dietary intervention (n = 142); (2) PA, physical activity intervention (n = 142); and (3) C, a control group receiving standard care (n = 141). All participants routinely in gestational weeks 11-14 had an initial dietary......-up reduced GWG compared with controls in obese pregnant women....

  4. Olympic Dam - the first decade

    International Nuclear Information System (INIS)

    Newton, A.W.; Wilson, M.A.; Harris, J.

    1988-01-01

    Most aspects of the pre-production phase of the Olympic Dam Project, from commencement of exploration in May 1975 through to commitment to development in December 1985 are documented here. The discovery by Western Mining Corporation Ltd of copper mineralisation on Roxby Downs Station in July 1975 has led to one of the more intensive base-metal exploration programmes undertaken in Australia. Comprehensive exploration, evaluation and feasibility studies between 1975 and 1985 have delineated a probable 450 million tonnes of higher grade ore containing 2.5% copper, 0.8 kg/t uranium oxide, 0.6 g/t gold and 6.0 g/t silver. The total resource is estimated at 2 billion tonnes containing 1.6% copper, 0.6 kg/t uranium oxide, 0.6 g/t gold and 3.5 g/t silver. At 31 December 1985, over 540 km of surface and underground drilling had been completed, comprising over 700 surface drillholes totalling 234 km of core and 218 km of open-hole drilling, and about 900 underground diamond-drillholes totalling 90 km. The Whenan Shaft had been sunk to 500 m and driving on three levels totalled almost 10 km. More than one million tonnes of ore and mullock were raised during development. A pilot treatment plant commissioned on site produced concentrates, matte and blister copper, and ammonium diuranate. Following a technical study of the Olympic Dam Project, completed in March 1985, and a subsequent economic feasibility study, it was announced on 11 June 1985 that the initial project was considered to be commercially viable. On 8 December 1985, the joint venturers, Western Mining Corporation Holdings Ltd (51%) and the BP Group (49%), announced their commitment to the Project. An appendix lists the important events that occurred between January 1986 and December 1987 in bringing Olympic Dam to the production state. 26 refs., 17 figs., 5 tabs., ills

  5. National dam inventory provides data for analysis

    International Nuclear Information System (INIS)

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  6. Fragility Analysis of Concrete Gravity Dams

    Science.gov (United States)

    Tekie, Paulos B.; Ellingwood, Bruce R.

    2002-09-01

    Concrete gravity dams are an important part ofthe nation's infrastructure. Many dams have been in service for over 50 years, during which time important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis events to be revised upwards, in some cases significantly. Many existing dams fail to meet these revised safety criteria and structural rehabilitation to meet newly revised criteria may be costly and difficult. A probabilistic safety analysis (PSA) provides a rational safety assessment and decision-making tool managing the various sources of uncertainty that may impact dam performance. Fragility analysis, which depicts fl%e uncertainty in the safety margin above specified hazard levels, is a fundamental tool in a PSA. This study presents a methodology for developing fragilities of concrete gravity dams to assess their performance against hydrologic and seismic hazards. Models of varying degree of complexity and sophistication were considered and compared. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930's. The hydrologic fragilities showed that the Eluestone Dam is unlikely to become unstable at the revised probable maximum flood (PMF), but it is likely that there will be significant cracking at the heel ofthe dam. On the other hand, the seismic fragility analysis indicated that sliding is likely, if the dam were to be subjected to a maximum credible earthquake (MCE). Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. Probabilities of relatively severe limit states appear to be only marginally affected by extremely rare events (e.g. the PMF and MCE). Moreover, the risks posed by the extreme floods and earthquakes were not balanced for the Bluestone Dam, with seismic hazard posing a relatively higher risk.

  7. Safety Aspects of Sustainable Storage Dams and Earthquake Safety of Existing Dams

    Directory of Open Access Journals (Sweden)

    Martin Wieland

    2016-09-01

    Full Text Available The basic element in any sustainable dam project is safety, which includes the following safety elements: ① structural safety, ② dam safety monitoring, ③ operational safety and maintenance, and ④ emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. However, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be carried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that dam safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.

  8. Counseling the pregnant adolescent.

    Science.gov (United States)

    Dibiasi, V; Sturgis, S H

    1980-07-01

    Approaches employed in counseling pregnant adolescents at the Crittenton Clinic in Boston are described. Concentrating on concrete issues of management of the pregnancy -- supplying information and exploring the pros and cons of various alternatives are advocated; probing into the psychological and emotional background of the pregnant adolescent is discouraged. Counseling about contraceptives and taking into account each individual situation are considered essential. Case studies are reviewed and figures representing the attitudes and contraceptive use of patients 1 year after abortion are presented. It is considered important to establish a trusting relationship with the adolescent, which will increase the likelihood that she will return for follow-up and additional help if she needs it.

  9. Fair inclusion of pregnant women in clinical trials: an integrated scientific and ethical approach.

    Science.gov (United States)

    van der Graaf, Rieke; van der Zande, Indira S E; den Ruijter, Hester M; Oudijk, Martijn A; van Delden, Johannes J M; Oude Rengerink, Katrien; Groenwold, Rolf H H

    2018-01-29

    Since pregnant women are severely underrepresented in clinical research, many take the position that the exclusion of pregnant women from research must be justified unless there are compelling "scientific reasons" for their exclusion. However, it is questionable whether this approach renders research with pregnant women fair. This paper analyzes and evaluates when research with pregnant women can be considered as fair and what constitutes scientific reasons for exclusion. Conceptual ethical and methodological analysis and evaluation of fair inclusion. Fair inclusion of pregnant women means (1) that pregnant women who are eligible are not excluded solely for being pregnant and (2) that the research interests of pregnant women are prioritized, meaning that they ought to receive substantially more attention. Fairness does not imply that pregnant women should be included in virtually every research project, as including only a few pregnant women in a population consisting only of women will not help to determine the effectiveness and safety of a treatment in pregnant women. Separate trials in pregnant women may be preferable once we assume, or know, that effects of interventions in pregnant women differ from the effects in other subpopulations, or when we assume, or know, that there are no differences. In the latter case, it may be preferable to conduct post-marketing studies or establish registries. If there is no conclusive evidence indicating either differences or equivalence of effects between pregnant and non-pregnant women, yet it seems unlikely that major differences or exact equivalence exist, the inclusion of pregnant women should be sufficient. Depending on the research question, this boils down to representativeness in terms of the proportion of pregnant and non-pregnant women, or to oversampling pregnant women. Fair inclusion of pregnant women in research implies that separate trials in pregnant women should be promoted. Inclusion of pregnant women has to

  10. Blood burden of di(2-ethylhexyl) phthalate and its primary metabolite mono(2-ethylhexyl) phthalate in pregnant and nonpregnant rats and marmosets

    International Nuclear Information System (INIS)

    Kessler, Winfried; Numtip, Wanwiwa; Grote, Konstanze; Csanady, Gyoergy A.; Chahoud, Ibrahim; Filser, Johannes G.

    2004-01-01

    A comparison of the dose-dependent blood burden of di(2-ethylhexyl) phthalate (DEHP) and mono(2-ethylhexyl) phthalate (MEHP) in pregnant and nonpregnant rats and marmosets is presented. Sprague-Dawley rats and marmosets were treated orally with 30 or 500 mg DEHP/kg per day, nonpregnant animals on 7 (rats) and 29 (marmosets) consecutive days, pregnant animals on gestation days 14-19 (rats) and 96-124 (marmosets). In addition, rats received a single dose of 1000 mg DEHP/kg. Blood was collected up to 48 h after dosing. Concentrations of DEHP and MEHP in blood were determined by GC/MS. In rats, normalized areas under the concentration-time curves (AUCs) of DEHP were two orders of magnitude smaller than the normalized AUCs of the first metabolite MEHP. Metabolism of MEHP was saturable. Repeated DEHP treatment and pregnancy had only little influence on the normalized AUC of MEHP. In marmosets, most of MEHP concentration-time courses oscillated. Normalized AUCs of DEHP were at least one order of magnitude smaller than those of MEHP. In pregnant marmosets, normalized AUCs of MEHP were similar to those in nonpregnant animals with the exception that at 500 mg DEHP/kg per day, the normalized AUCs determined on gestation days 103, 117, and 124 were distinctly smaller. The maximum concentrations of MEHP in blood of marmosets were up to 7.5 times and the normalized AUCs up to 16 times lower than in rats receiving the same daily oral DEHP dose per kilogram of body weight. From this toxicokinetic comparison, DEHP can be expected to be several times less effective in the offspring of marmosets than in that of rats if the blood burden by MEHP in dams can be regarded as a dose surrogate for the MEHP burden in their fetuses

  11. Measuring and managing safety at Wahleach Dam

    International Nuclear Information System (INIS)

    Salmon, G. M.; Cattanach, J. D.; Hartford, D. N. D.

    1996-01-01

    Safety improvements recently implemented at the Wahleach Dam were described as one of the first instances in international dam safety practice where risk concepts have been used in conjunction with acceptable risk criteria to evaluate safety of a dam relative to required level of safety. Erosion was identified as the greatest threat to the safety of the dam. In addressing the deficiencies B.C. Hydro formulated a process which advocates a balanced level of safety,i.e. the probability of failure multiplied by the consequences of failure, integrated over a range of initiators. If the risk posed by the dam is lower than a 'tolerable' risk, the dam is considered to be safe enough. In the case of the Wahleach Dam, the inflow design flood (IDF) was selected to be about one half of the probable maximum flow (PMF), hence it was more likely than not that the spillway could pass floods up to and including the PMF. By accepting the determined level of risk, expenditures of several million dollars for design and construction of dam safety improvements were made redundant. Another byproduct of this new concept of risk assessment was the establishment of improved life safety protection by means of an early warning system for severe floods through the downstream community and emergency authorities. 3 refs., 5 tabs

  12. Descriptive characteristics of the large Italian dams

    International Nuclear Information System (INIS)

    Dello Vicario, E.; Petaccia, A.; Savanella, V.

    1999-01-01

    In the present note the characteristics of the Italian dams are examined, underlining, in a statistical view, story, geographical location, types and use of the most important works. Such a review can be useful for a more detailed analysis, both for the dams characterization and for further studies relevant to water resources utilization [it

  13. [Violence towards pregnant women].

    Science.gov (United States)

    Kramek, J; Grzymała-Krzyzostaniak, A; Celewicz, Z; Ronin-Walknowska, E

    2001-12-01

    The aim of this work was the evaluation of the scale of violence towards pregnant women in the westpomeranian province, the definition of the social-biological profile of women exposed to violence and social-biological profile of their partners. The evaluation of the influence of violence on pregnant women's ending term and the weight of the newborns. 481 women were enrolled and an anonymous study was used in the form of questionnaires. A questionnaire was a modified form of a query-sheet proposed by WHO. 25% of the enrolled women were exposed to physical and psychological (emotional) abuse, 7.1% to psychical violence, women and men exposed to violence in their childhood more often become violent in their adult life. Men that physically abuse pregnant women are often of primary school education, are unemployed, drink alcohol and smoke. Physical abuse by a partner during pregnancy usually experience women with primary school education, who drink and smoke. Violence during pregnancy is usually associated with premature delivery as well as low birth weight of the newborns.

  14. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    International Nuclear Information System (INIS)

    Amini, Ali Reza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-01-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams

  15. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  16. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong; Bao, Kai; Zhang, Hui

    2011-01-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  17. Seismic response of uplifting concrete gravity dams

    International Nuclear Information System (INIS)

    Leger, P.; Sauve, G.; Bhattacharjee, S.

    1992-01-01

    The foundation interaction effects on the seismic response of dam-foundation systems have generally been studied using the linear elastic finite element models. In reality, the foundation can not develop effective tensile stresses to a significant degree along the interface. A two-dimensional finite element model, in which nonlinear gap elements are used at the dam-foundation interface to determine the uplift response of concrete gravity dams subjected to seismic loads, is presented. Time domain analyses were performed for a wide range of modelling assumptions such as dam height, interface uplift pressure, interface mesh density, and earthquake input motions, that were systematically varied to find their influence on the seismic response. The nonlinear interface behavior generally reduces the seismic response of dam-foundation systems acting as a seismic isolation mechanism, and may increase the safety against sliding by reducing the base shear transmitted to the foundation. 4 refs., 5 figs., 6 tabs

  18. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  19. Beyond hydrology in the sustainability assessment of dams: A planners perspective - The Sarawak experience

    Science.gov (United States)

    Andre, Edward

    2012-01-01

    SummaryThere is increasing concern about the availability of water supplies in developing countries to provide clean drinking water and sanitation as well as providing for irrigation for food security. This has led to hydrologically led investigation to establish the feasibility and storage capacity of potentially new dam sites. This task has become more difficult for hydrologists and others with the uncertainties created by climate change and the measurement of the hydrological, geographical and ecological footprint of new dams. The questions asked by hydrologists are increasingly likely to be required to be cast in terms of the four pillars of sustainability; environmental, economic, social and institutional. Similarly, regional planners have to be more cognisant of the social outcomes of dam development while understanding the wider hydrological context at a watershed and basin level. The paper defines the concept of sustainability assessment in the context of resettlement and analyses its implications for the Bakun Hydro-electric project in Sarawak, Malaysia. Specifically it attempts to address the question of what social sustainability would really mean in the context of communities affected by dam projects, and their catchments using hermeneutics, tradeoffs and offsets. The findings of this question were presented at a hydrological conference held in Santiago in October 2010, based on the outcome of specific questionnaire responses received from indigenous peoples affected by the Bakun Dam hydroelectric project. The paper also offers some insights pertaining to the social sustainability assessment aspects of dams and their catchments.

  20. Heterologous Infection of Pregnant Mice Induces Low Birth Weight and Modifies Offspring Susceptibility to Malaria.

    Directory of Open Access Journals (Sweden)

    Ankur Sharma

    Full Text Available Pregnancy malaria (PM is associated with poor pregnancy outcomes, and can arise due to relapse, recrudescence or a re-infection with heterologous parasites. We have used the Plasmodium chabaudi model of pregnancy malaria in C57BL/6 mice to examine recrudescence and heterologous infection using CB and AS parasite strains. After an initial course of patent parasitemia and first recrudescence, CB but not AS parasites were observed to recrudesce again in most animals that became pregnant. Pregnancy exacerbated heterologous CB infection of AS-experienced mice, leading to mortality and impaired post-natal growth of pups. Parasites were detected in placental blood without evidence of sequestration, unlike P. falciparum but similar to other malaria species that infect pregnant women. Inflammatory cytokine levels were elevated in pregnant females during malaria, and associated with intensity of infection and with poor outcomes. Pups born to dams during heterologous infection were more resistant to malaria infections at 6-7 weeks of age, compared to pups born to malaria-experienced but uninfected dams or to malaria-naïve dams. In summary, our mouse model reproduces several features of human PM, including recrudescences, heterologous infections, poor pregnancy outcomes associated with inflammatory cytokines, and modulation of offspring susceptibility to malaria. This model should be further studied to explore mechanisms underlying PM pathogenesis.

  1. Population pharmacokinetics of artesunate and dihydroartemisinin in pregnant and non-pregnant women with malaria

    Directory of Open Access Journals (Sweden)

    Bose Carl

    2011-05-01

    Full Text Available Abstract Background The World Health Organization endorses the use of artemisinin-based combination therapy for treatment of acute uncomplicated falciparum malaria in the second and third trimesters of pregnancy. However, the effects of pregnancy on the pharmacokinetics of artemisinin derivatives, such as artesunate (AS, are poorly understood. In this analysis, the population pharmacokinetics of oral AS, and its active metabolite dihydroartemisinin (DHA, were studied in pregnant and non-pregnant women at the Kingasani Maternity Clinic in the DRC. Methods Data were obtained from 26 pregnant women in the second (22 - 26 weeks or the third (32 - 36 weeks trimester of pregnancy and from 25 non-pregnant female controls. All subjects received 200 mg AS. Plasma AS and DHA were measured using a validated LC-MS method. Estimates for pharmacokinetic and variability parameters were obtained through nonlinear mixed effects modelling. Results A simultaneous parent-metabolite model was developed consisting of mixed zero-order, lagged first-order absorption of AS, a one-compartment model for AS, and a one-compartment model for DHA. Complete conversion of AS to DHA was assumed. The model displayed satisfactory goodness-of-fit, stability, and predictive ability. Apparent clearance (CL/F and volume of distribution (V/F estimates, with 95% bootstrap confidence intervals, were as follows: 195 L (139-285 L for AS V/F, 895 L/h (788-1045 L/h for AS CL/F, 91.4 L (78.5-109 L for DHA V/F, and 64.0 L/h (55.1-75.2 L/h for DHA CL/F. The effect of pregnancy on DHA CL/F was determined to be significant, with a pregnancy-associated increase in DHA CL/F of 42.3% (19.7 - 72.3%. Conclusions In this analysis, pharmacokinetic modelling suggests that pregnant women have accelerated DHA clearance compared to non-pregnant women receiving orally administered AS. These findings, in conjunction with a previous non-compartmental analysis of the modelled data, provide further evidence that

  2. The role of dams in development

    International Nuclear Information System (INIS)

    Cakmak, C.

    2001-01-01

    Although the amounts of water resources are enough for the entire world, the distribution of them in time and space shows uneven pattern. The water need is increasing with heavy industrial and agricultural requirements, while available water in the world remains as a fixed source. Economic growth, socio-cultural, and environmental developments are being realized following these changes. In order to achieve sustainable management of water resources, these changes have to be taken into consideration in water-related development projects. Demand for water is steadily increasing through out the world, even though the fresh water resources are limited and unevenly distributed, during the past three centuries, the amount of water withdrawn from fresh water resources has increased by a factor of 35, whereas world population by a factor 8. The engineering of dams, which provides regular water from reservoirs of dams to be used in case of demand pattern, is a vital part of the civilization. Dams have played a key rote in the development since the third millennium B C when the first great civilizations evolved on major rivers, such as Tigris-Euphrates, the Nile and the Indus. From these early times dams were built for flood control, water supply, irrigation and navigation. Dams also had been built to produce motive power and electricity since the industrial revolution. Development priorities changed, experience accumulated with the construction and operation of dams. Although the importance of water is well known in the human life and civilization around the world, still various groups argue that expected economic benefits are not being produced and that major environmental, economic and social costs are not being taken into account. By the end of 20th century, there were 45000 large dams in over 150 countries. According to the same classification there are 625 large dams in Turkey. All over the world, 50 % of the large dams were built mainly for irrigation. It is estimated

  3. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the

  4. Dam construction in salt rock

    International Nuclear Information System (INIS)

    Stockmann, N.; Beinlich, A.; Flach, D.; Jockwer, N.; Klarr, K.; Krogmann, P.; Miehe, R.; Schmidt, M.W.; Schwaegermann, H.F.; Walter, F.; Yaramanci, U.

    1991-11-01

    Barriers are a major component of the satefy concept for the Gorleben repository. The construction and performance of dams are currently tested within the framework of a project carried out in the Asse salt mine. A measuring programme has been established to give evidence of the sealing capacities of a barrier consisting of an abatement, long-term sealing material, and a hydraulic sealing system. Tests are to be made to verify the barrier's performance for shorter of long time periods (up to about 500 years). The tests are assisted by computed models established for the project. The long-term safety aspects to be studied include such conditions as permeability changes due to mechanical impacts, circulation conditions at the roadside, and the serviceable life and efficiency of the sealing components. (DG) [de

  5. The Manantali dam. Synthesis report

    International Nuclear Information System (INIS)

    Dickmann, M.; Sieburger, Dr; Ficatier, M.; Naudet, M.; Schmidt, M.; Seve, M.

    2009-01-01

    This report proposes an ex-post assessment of the Manantali dam on the Senegal river and of the related investments in Senegal, in Mauritania and in Mali. After a presentation of the methodology adopted for this assessment study performed by several organisms, the report describes the context and the concerned sectors: project costs and funding, framework for irrigated agriculture, and framework for energy. It discusses the relevance of the project with respect to irrigated agriculture and to energy. It assesses the project performance in terms of efficiency and of viability, and with respect to environmental aspects. It presents an overview of the different direct and indirect sector-based partners which are involved in energy or rural development. The next part proposes an assessment of the global impact of the project on development as far as irrigated agriculture, the energy sector, and regional cooperation and integration are concerned. A set of lessons learned and recommendations are then formulated

  6. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  7. Sinkhole remediation at Swinging Bridge Dam

    Energy Technology Data Exchange (ETDEWEB)

    Jones, A. [Devine Tarbell and Associates, Portland, ME (United States)

    2009-07-01

    This case history summary described a piping-related sinkhole that occurred after a flood at the Swinging Bridge Dam. The earth-filled embankment dam was constructed using a hydraulic fill technique. A foundation drilling and grouting program was constructed in areas of the dam founded on jointed sandstone and shale. The storage volumes of the reservoir is 32,000 acre-feet. A sinkhole 25 to 300 feet in diameter was observed on May 5, 2005 along the edge of the dam crest. The sinkhole extended to within 10 feet of the reservoir and was separated by a shallow berm of soil and driftwood. Cracking of the crest extended across an area of 180 feet. Operations staff notified the appropriate agencies, implemented a monitoring program, and mobilized construction equipment and sands for use as emergency sinkhole filler. An increase in tailrace turbidity was observed. Historical records for the dam showed significant cracking during the initial filling of the reservoir. Failure modes included increased pore pressures and seepages resulting in the piping of soil along the outside of the dam conduit. Emergency repairs included chemical grouting and weld repairs in the penstocks. A Federal Emergency Management Agency (FEMA) is currently addressing safety issues associated with conduits through dams. 4 refs., 11 figs.

  8. Comparative analysis between endometrial proteomes of pregnant and non-pregnant ewes during the peri-implantation period.

    Science.gov (United States)

    Zhao, Haichao; Sui, Linlin; Miao, Kai; An, Lei; Wang, Dong; Hou, Zhuocheng; Wang, Rui; Guo, Min; Wang, Zhilong; Xu, Jiqiang; Wu, Zhonghong; Tian, Jianhui

    2015-01-01

    Early pregnancy failure has a profound impact on both human reproductive health and animal production. 2/3 pregnancy failures occur during the peri-implantation period; however, the underlying mechanism(s) remains unclear. Well-organized modification of the endometrium to a receptive state is critical to establish pregnancy. Aberrant endometrial modification during implantation is thought to be largely responsible for early pregnancy loss. In this study, using well-managed recipient ewes that received embryo transfer as model, we compared the endometrial proteome between pregnant and non-pregnant ewes during implantation period. After embryo transfer, recipients were assigned as pregnant or non-pregnant ewes according to the presence or absence of an elongated conceptus at Day 17 of pregnancy. By comparing the endometrial proteomic profiles between pregnant and non-pregnant ewes, we identified 94 and 257 differentially expressed proteins (DEPs) in the endometrial caruncular and intercaruncular areas, respectively. Functional analysis showed that the DEPs were mainly associated with immune response, nutrient transport and utilization, as well as proteasome-mediated proteolysis. These analysis imply that dysfunction of these biological processes or pathways of DEP in the endometrium is highly associated with early pregnancy loss. In addition, many proteins that are essential for the establishment of pregnancy showed dysregulation in the endometrium of non-pregnant ewes. These proteins, as potential candidates, may contribute to early pregnancy loss.

  9. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural

  10. Sustainability of dams-an evaluation approach

    Science.gov (United States)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the

  11. Investigating leaks in dams and reservoirs

    International Nuclear Information System (INIS)

    2003-01-01

    Millions of people throughout the world depend on dams and reservoirs for electricity, water and flood protection. Dams require significant investment to build and maintain, and yet their usefulness and integrity are constantly threatened by leakage and sedimentation. Isotope hydrology techniques, combined with conventional analytical methods, are a cost-effective tool to reduce such threats. The International Atomic Energy Agency is promoting their use to protect these investments and improve management, particularly by supporting specialized teams of scientists and engineers to investigate dam leakage in African countries on request. (IAEA)

  12. Developing an integrated dam safety program

    International Nuclear Information System (INIS)

    Nielsen, N. M.; Lampa, J.

    1996-01-01

    An effort has been made to demonstrate that dam safety is an integral part of asset management which, when properly done, ensures that all objectives relating to safety and compliance, profitability, stakeholders' expectations and customer satisfaction, are achieved. The means to achieving this integration of the dam safety program and the level of effort required for each core function have been identified using the risk management approach to pinpoint vulnerabilities, and subsequently to focus priorities. The process is considered appropriate for any combination of numbers, sizes and uses of dams, and is designed to prevent exposure to unacceptable risks. 5 refs., 1 tab

  13. Geophysics Methods in Electrometric Assessment of Dams

    Energy Technology Data Exchange (ETDEWEB)

    Davydov, V. A., E-mail: davydov-va@yandex.ru; Baidikov, S. V., E-mail: badikek@mail.ru; Gorshkov, V. Yu., E-mail: vitalaa@yandex.ru; Malikov, A. V., E-mail: alex.mal.1986@mail.ru [Russian Academy of Sciences, Geophysical Institute, Ural Branch (Russian Federation)

    2016-07-15

    The safety assessment of hydraulic structures is proposed to be conducted via geoelectric measurements, which are capable of assessing the health of earth dams in their natural bedding without intervention in their structure. Geoelectric measurements are shown as being capable of pinpointing hazardous parts of a dam, including areas of elevated seepage. Applications of such methods are shown for a number of mini-dams in the Sverdlovsk region. Aparameter (effective longitudinal conductivity) that may be used to monitor the safety of hydraulic structures is proposed. Quantitative estimates of this parameter are given in terms of the degree of safely.

  14. Predictions of total deformations in Jebba main dam by finite ...

    African Journals Online (AJOL)

    This paper examined the deformations of the Jebba Main Dam, Jebba Nigeria using the finite element method. The study also evaluated the predicted deformations and compared them with the actual deformations in the dam to identify possible causes of the observed longitudinal crack at the dam crest. The Jebba dam is a ...

  15. The geomorphic legacy of small dams — An Austrian study

    NARCIS (Netherlands)

    Poeppl, R.E.; Keesstra, S.D.; Hein, T.

    2015-01-01

    Dams represent one of the most dominant forms of human impact upon fluvial systems during the Anthropocene, as they disrupt the downstream transfer of water and sediments. Removing dams restores river continuity and channel morphology. Both dam construction and dam removal induce geomorphic channel

  16. Evaluating safety of concrete gravity dam on weak rock: Scott Dam

    International Nuclear Information System (INIS)

    Goodman, R.E.; Ahlgren, C.S.

    2000-01-01

    Scott Dam is owned and operated by Pacific Gas and Electric Co. (PG and E) as part of the Potter Valley Project. Although it is an unimpressive concrete gravity dam [233 m (765 ft) long with maximum water surface 33.4 m (110 ft) above tail water], the dam has unusually complex and weak foundation rocks; thick condition caused design changes during construction, numerous subsequent special investigations, and several corrections and additions. A main stumbling block to clarification of the dam safety issue for Scott Dam has always been difficulty in characterizing the foundation material. This paper discusses an approach to this problem as well s how the safety of the dam was subsequently confirmed. Following a comprehensive program of research, investigations, and analysis from 1991 to 1997

  17. The Legal Rights of Pregnant Students and Pregnant Employees.

    Science.gov (United States)

    Evers, Irving C.

    This speech presents an analysis of court cases dealing with the rights of pregnant students and pregnant employees. The discussion of these rights, such as the right to maternity leave, focuses around the Civil Rights Act of 1964 and its implications for equal employment opportunity. The court cases discussed consider the application of the equal…

  18. Biochemical Profiles of Pregnant and Non-pregnant Women ...

    African Journals Online (AJOL)

    2018-05-01

    May 1, 2018 ... sample was collected from 139 pregnant and 139 age matched ... have major consequences for fetal growth. ... metabolic disorder in pregnancy is gestational ... expected to be 23.4 %, and the child mortality rate ... diabetic pregnant women and her unborn infant ... hemorrhage, fetal obesity, miscarriage,.

  19. How I Got Pregnant

    Directory of Open Access Journals (Sweden)

    Dwyer, James

    2014-04-01

    Full Text Available This short story raises ethical issues about a woman’s request for medical assistance to get pregnant. In this fictional account, a 34-year-old woman has been trying to get pregnant for the last year. Her husband would like to keep trying for one more year, but the woman loses patience. She visits an ob-gyn and requests artificial insemination. She does not intend to tell her husband about this medical assistance. The doctor has helped single women, lesbian couples, and married couples with pregnancies, but he feels conflicted by this request. The doctor and the woman discuss their concerns and plans. Then they decide on a course of action. In a creative way, this story aims to bring to life ethical issues about assisted reproduction, complex relationships, individual choice, non- judgmental attitudes, deception, confidentiality, genetic connections, and social parents. But this story is not a textbook case that illustrates a clearly defined ethical issue. On the contrary, the story shows that some common ethical ideas don’t quite fit the characters’ experiences and the readers’ reactions.

  20. On the response of large dams to incoherent seismic excitation

    International Nuclear Information System (INIS)

    Ramadan, O.; Novak, M.

    1993-01-01

    An intensive parametric study was conducted to investigate the response of concrete gravity dams to horizontal, spatially variable seismic ground motions. Both segmented dams consisting of separate blocks, or monoliths, and continuous monolithic dams are considered. The study includes the effects of various parameters on system natural frequencies, vibration modes, modal displacement ratios, as well as dam displacements and internal stresses due to spatially variable ground motions. The dam analytical model, and dam response to incoherent ground motions are described. The results show that the dam vibrates almost as a rigid body under the fully correlated waves, but bends and twists significantly under the spatially correlated motions. Dam-foundation interaction magnifies the low frequency components of the dam response, more so for a full reservoir, but decreases the high frequency components. For long dams, the effects of spatially incoherent ground motions are qualitatively different and can be much greater than those due to surface travelling waves. 3 refs., 3 figs

  1. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    Science.gov (United States)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  2. 33 CFR 100.1102 - Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam...

    Science.gov (United States)

    2010-07-01

    ... River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). 100.1102 Section... MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.1102 Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). (a) General. Sponsors are...

  3. 78 FR 77397 - Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas

    Science.gov (United States)

    2013-12-23

    ... Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas AGENCY: U.S. Army Corps... Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas. In 1997, the Lower Colorado River... regulations to reflect changes in ownership and responsibilities of flood control management of Marshall Ford...

  4. 33 CFR 208.19 - Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Marshall Ford Dam and Reservoir... Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. The Secretary of the Interior, through his agent, the Lower Colorado River Authority (LCRA) shall operate the Marshall Ford Dam...

  5. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This paper summarizes the conclusions of the annual inspections of French dams in operation (fissures, water oozing, concrete swelling etc..). Only the observations which require a special attention are reported. (J.S.)

  6. Physical - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  7. Biological - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  8. Seismic risks at Elsie Lake Main Dam

    International Nuclear Information System (INIS)

    McCammon, N.R.; Momenzadeh, M.; Hawson, H.H.; Nielsen, N.M.

    1991-01-01

    The Elsie Lake dams are located on Vancouver Island in an area of high seismic risk. A safety review in 1986 indicated potential deficiencies in the earthfill main dam with respect to modern earthquake design standards. A detailed field investigation program comprising drilling and penetration tests was carried out and the results used in an assessment of seismic stability. A 0.8 m thick less dense layer in the granular shell of the dam, possibly caused by wet construction conditions, would likely liquefy in a major earthquake but sufficient residual strength would likely remain to prevent catastrophic failure. The dam shell might undergo some distortion, and an assessment was initiated to determine the requirements for reservoir drawdown following an extreme earthquake to ensure the timely lowering of the reservoir for inspection and repair. It was suggested that an adequate evacuation capability would be 25% and 50% drawdown in not more than 30 and 50 days, respectively. 9 refs., 11 figs., 1 tab

  9. Can Dams and Reservoirs Cause Earthquakes?

    Indian Academy of Sciences (India)

    induced earthquakes in that region. Figure 1. A cartoon to illus- trate the spatial relation- ships between dam, reser- ... learning experience for us graduate students. Thus, on that ... infallibility and persuasiveness as in Euclidean geometry. The.

  10. Risk assessment of tailings facility dam failure

    OpenAIRE

    Hadzi-Nikolova, Marija; Mirakovski, Dejan; Stefanova, Violeta

    2011-01-01

    This paper presents the consequences of tailings facility dam failure and therefore the needs for its risk assessment. Tailings are fine-grained wastes of the mining industry, output as slurries, due to mixing with water during mineral processing. Tailings dams vary a lot as it is affected by: tailings characteristics and mill output, site characteristics as: topography, hydrology, geology, groundwater, seismicity and available material and disposal methods. The talings which accumulat...

  11. The environmental impact of large dams

    International Nuclear Information System (INIS)

    Razvan, E.

    1992-01-01

    The campaigns of conservationist groups against dams are generally based on rather emotional issues. This paper puts the situation in a more rational perspective, by analysing the various claims which tend to be put forward concerning the impacts of large dams, examining the validity of the arguments, looking at ways in which any adverse effects can be mitigated, and presenting the complexity of the problems. (author)

  12. urinary tract infections amongst pregnant women attending

    African Journals Online (AJOL)

    boaz

    Urinary tract infection (UTI) constitutes a major health problem in pregnant women due to their relatively short urethra, which ... the urine samples of pregnant women prior to treatment. ... Of 500 asymptomatic pregnant women screened, 433.

  13. Estimating flood inundation caused by dam failures

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada). School of Engineering; Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-01-15

    Recent advancements in modelling inundation due to dam failures have allowed easier and more illustrative analyses of potential outcomes. This paper described new model and mapping capabilities available using the HEC-RAS hydraulic model in concert with geographic information systems (GIS). The study area was the upper reaches of Canagagigue Creek and the Woolwich Dam near Elmira, Ontario. A hydraulic analysis of a hypothetical dam failure was developed based on the summer probable maximum flood (PMF) event. Limits extended from Woolwich Dam to downstream of the Town of Elmira. An incoming summer PMF hydrograph was set as the upstream boundary condition in the upstream model. Simulation parameters include simulation time-step; implicit weighting factor; water surface calculation tolerance; and output calculation interval. Peak flows were presented, as well as corresponding flood inundation results through the Town of Elmira. The hydraulic model results were exported to a GIS in order to develop inundation maps for emergency management planning. Results from post-processing included inundation maps for each of the simulated time-steps as well as an inundation animation for the duration of the dam breach. It was concluded that the modelling tools presented in the study can be applied to other dam safety assessment projects in order to develop effective and efficient emergency preparedness plans through public consultation and the establishment of impact zones. 1 tab., 2 figs.

  14. Expectations of immortality: dam safety management into the next millennium

    International Nuclear Information System (INIS)

    Palmer, M.D.

    1999-01-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs

  15. The morphodynamics of sediment movement through a reservoir during dam removal

    OpenAIRE

    Bromley, Chris

    2008-01-01

    Dam removal has recently emerged as a growing trend in river rehabilitation in the United States. The rate of dam removal has been increasing rapidly since 2000, but is doing so with large gaps in our understanding of how the fluvial system will respond to this disturbance. Most of the structures removed to date have been relatively small and, in the vast majority of cases, have not received any pre- or post-removal monitoring. Very few large structures have been removed but, when such remova...

  16. Hydraulics of embankment-dam breaching

    Science.gov (United States)

    Walder, J. S.; Iverson, R. M.; Logan, M.; Godt, J. W.; Solovitz, S.

    2012-12-01

    Constructed or natural earthen dams can pose hazards to downstream communities. Experiments to date on earthen-dam breaching have focused on dam geometries relevant to engineering practice. We have begun experiments with dam geometries more like those of natural dams. Water was impounded behind dams constructed at the downstream end of the USGS debris-flow flume. Dams were made of compacted, well-sorted, moist beach sand (D50=0.21 mm), 3.5 m from toe to toe, but varying in height from 0.5 to 1 m; the lower the dam, the smaller the reservoir volume and the broader the initially flat crest. Breaching was started by cutting a slot 30-40 mm wide and deep in the dam crest after filling the reservoir. Water level and pore pressure within the dam were monitored. Experiments were also recorded by an array of still- and video cameras above the flume and a submerged video camera pointed at the upstream dam face. Photogrammetric software was used to create DEMs from stereo pairs, and particle-image velocimetry was used to compute the surface-velocity field from the motion of tracers scattered on the water surface. As noted by others, breaching involves formation and migration of a knickpoint (or several). Once the knickpoint reaches the upstream dam face, it takes on an arcuate form whose continued migration we determined by measuring the onset of motion of colored markers on the dam face. The arcuate feature, which can be considered the head of the "breach channel", is nearly coincident with the transition from subcritical to supercritical flow; that is, it acts as a weir that hydraulically controls reservoir emptying. Photogenic slope failures farther downstream, although the morphologically dominant process at work, play no role at all in hydraulic control aside from rare instances in which they extend upstream so far as to perturb the weir, where the flow cross section is nearly self-similar through time. The domain downstream of the critical-flow section does influence

  17. QT Interval in Pregnant and Non-pregnant Women

    Directory of Open Access Journals (Sweden)

    Majid Zamani

    2014-03-01

    Full Text Available Introduction: Prolongation of QT interval might result in dangerous cardiac arrhythmias, including Torsades de Pointes (TdP, consequently leading to syncope or death. A limited number of studies carried out in this respect to date have shown that QT interval might increase during pregnancy. On the other hand, it has been shown that each pregnancy might result in an increase in the risk of cardiac accidents in patients with long QT interval. Therefore, the present study was undertaken to compare QT intervals in pregnant and non-pregnant women. Methods: Pregnant women group consisted of 40 women in the second and third trimesters of pregnancy and the non-pregnant control group consisted of healthy women 18-35 years of age. All the patients underwent standard 12-lead electrocardiogram (ECG. The QT interval was measured for each patient at lead II. The mean corrected QT interval (QTc and QT dispersions (QTd were compared between the two groups. Results: Mean heart rates in the pregnant and non-pregnant groups were 98.55±14.09 and 72.53±13.17 beats/minutes (P<0.001. QTd and QTc means were in the normal range in both groups; however, these variables were 49.50±12.80 and 43.03±18.47 milliseconds in the pregnant group and 39.5±9.59 and 40.38±17.20 milliseconds in the control group, respectively (P<0.001. Conclusion: The QT interval was longer in pregnant women compared to non-pregnant women; however, it was in the normal range in both groups. Therefore, it is important to monitor and manage risk factors involved in prolongation of QT interval and prevent concurrence of these factors with pregnancy.

  18. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    Science.gov (United States)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  19. the effect of age of dam on weaning mass for ftve dam breed types

    African Journals Online (AJOL)

    SUMMARY: The effect of age of dam on adjusted 210 day calf weaning mass was estimated by the Least Squares method for 5 dam types on 2 farms. ... the later maturing breeds would have a low level of productivity because these cows would be eliminated in their potentially prime .... time at 28 (2A) or 3l (28) months old.

  20. The interplay of activists and dam developers : the case of Myanmar’s mega-dams

    NARCIS (Netherlands)

    Kirchherr, Julian|info:eu-repo/dai/nl/411261487; J. Charles, Katrina; Walton, Matthew J.

    2017-01-01

    Scholars investigating activism against large dam developments in Asia usually focus on those campaigning, but not on those the campaigns are aimed at–the dam developers. Yet the developers’ perspective is crucial to comprehensively understand the dynamics of social and environmental activism in

  1. Dam that social networking: connecting South Africa's major dams to social media

    CSIR Research Space (South Africa)

    Butgereit, L

    2011-10-01

    Full Text Available where four major South African dams are connected to Twitter and Facebook (and other social media such as MXit and Google Chat) in a mechanism which would be easy to replicate for additional dams or rivers. Data is supplied by the South African...

  2. Modeling the capacity of riverscapes to support beaver dams

    Science.gov (United States)

    Macfarlane, William W.; Wheaton, Joseph M.; Bouwes, Nicolaas; Jensen, Martha L.; Gilbert, Jordan T.; Hough-Snee, Nate; Shivik, John A.

    2017-01-01

    The construction of beaver dams facilitates a suite of hydrologic, hydraulic, geomorphic, and ecological feedbacks that increase stream complexity and channel-floodplain connectivity that benefit aquatic and terrestrial biota. Depending on where beaver build dams within a drainage network, they impact lateral and longitudinal connectivity by introducing roughness elements that fundamentally change the timing, delivery, and storage of water, sediment, nutrients, and organic matter. While the local effects of beaver dams on streams are well understood, broader coverage network models that predict where beaver dams can be built and highlight their impacts on connectivity across diverse drainage networks are lacking. Here we present a capacity model to assess the limits of riverscapes to support dam-building activities by beaver across physiographically diverse landscapes. We estimated dam capacity with freely and nationally-available inputs to evaluate seven lines of evidence: (1) reliable water source, (2) riparian vegetation conducive to foraging and dam building, (3) vegetation within 100 m of edge of stream to support expansion of dam complexes and maintain large colonies, (4) likelihood that channel-spanning dams could be built during low flows, (5) the likelihood that a beaver dam is likely to withstand typical floods, (6) a suitable stream gradient that is neither too low to limit dam density nor too high to preclude the building or persistence of dams, and (7) a suitable river that is not too large to restrict dam building or persistence. Fuzzy inference systems were used to combine these controlling factors in a framework that explicitly also accounts for model uncertainty. The model was run for 40,561 km of streams in Utah, USA, and portions of surrounding states, predicting an overall network capacity of 356,294 dams at an average capacity of 8.8 dams/km. We validated model performance using 2852 observed dams across 1947 km of streams. The model showed

  3. Increasing drought risk in large-dam basins of South Korea

    Science.gov (United States)

    Jung, I. W.; Shin, Y.; Park, J.; Kim, D.

    2017-12-01

    In 2015, South Korea suffered one of the worst droughts in recent years. Seoul and Gyeonggi and Gangwon provinces experienced severe drought conditions, receiving less than 43 percent of the annual precipitation average of the past 30 years. Additionally, the 2015 summer precipitation was less than half of the average. The lack of summer precipitation induced serious shortages in dam storages, which are important supplies for the dry season. K-water, a public company managing South Korea's public water supply system, is fighting to secure public water supply and minimize potential damage that may occur before the subsequent wet season. This study detected significant decreasing trends (95% confidence interval) in dry-seasonal runoff rates (=dam inflow / precipitation) in three dams basins (Soyang, Chungju, and Andong). Changes in potential evapotranspiration (PET) and precipitation indices were examined to investigate potential causes of decreasing runoff rates trends. However, there were no clear relations among changes in runoff rates, PET, and precipitation indices. Runoff rate reduction in the three dams may increase the risk of dam operational management and long-term water resource planning. Therefore, it will be necessary to perform a multilateral analysis to better understand decreasing runoff rates.AcknowledgementsThis research was supported by a grant(2017-MPSS31-001) from Supporting Technology Development Program for Disaster Management funded by Ministry of Public Safety and Security(MPSS) of the Korean government.

  4. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  5. Hydrogeophysical investigations at Hidden Dam, Raymond, California

    Science.gov (United States)

    Minsley, Burke J.; Burton, Bethany L.; Ikard, Scott; Powers, Michael H.

    2011-01-01

    Self-potential and direct current resistivity surveys are carried out at the Hidden Dam site in Raymond, California to assess present-day seepage patterns and better understand the hydrogeologic mechanisms that likely influence seepage. Numerical modeling is utilized in conjunction with the geophysical measurements to predict variably-saturated flow through typical two-dimensional dam cross-sections as a function of reservoir elevation. Several different flow scenarios are investigated based on the known hydrogeology, as well as information about typical subsurface structures gained from the resistivity survey. The flow models are also used to simulate the bulk electrical resistivity in the subsurface under varying saturation conditions, as well as the self-potential response using petrophysical relationships and electrokinetic coupling equations.The self-potential survey consists of 512 measurements on the downstream area of the dam, and corroborates known seepage areas on the northwest side of the dam. Two direct-current resistivity profiles, each approximately 2,500 ft (762 m) long, indicate a broad sediment channel under the northwest side of the dam, which may be a significant seepage pathway through the foundation. A focusing of seepage in low-topography areas downstream of the dam is confirmed from the numerical flow simulations, which is also consistent with past observations. Little evidence of seepage is identified from the self-potential data on the southeast side of the dam, also consistent with historical records, though one possible area of focused seepage is identified near the outlet works. Integration of the geophysical surveys, numerical modeling, and observation well data provides a framework for better understanding seepage at the site through a combined hydrogeophysical approach.

  6. Disposition of diiosononyl phthalate and its effects on sexual development of the male fetus following repeated dosing in pregnant rats.

    Science.gov (United States)

    Clewell, Rebecca A; Sochaski, Mark; Edwards, Kendra; Creasy, Dianne M; Willson, Gabrielle; Andersen, Melvin E

    2013-01-01

    Pregnant Sprague-Dawley rats received 50, 250, and 500 mg/kg/day diisononyl phthalate (DiNP) from GD 12 to 19 via corn oil gavage to study the dose response for effects on fetal male rat sexual development as well as metabolite disposition in the dam and fetus. Monoisononyl phthalate (MiNP), mono(carboxy-isooctyl) phthalate (MCiOP), mono(hydroxyl-isononyl) phthalate (MHiNP), mono(oxo-isononyl) phthalate (MOiNP), and monoisononyl phthalate glucuronide (MiNP-G) were found in all measured tissues. MCiOP was the major metabolite, followed in decreasing order by MiNP, MHiNP, MOiNP, and MiNP-G. Percentage of dose absorbed decreased at 750 mg/kg/day. Testosterone concentration in the fetal testes was reduced at 250 and 750 mg/kg/day. Multinucleated germ cells were increased in the testes of rats at 250 and 750 mg/kg/day. The no observed effect level (NOEL) for this study was 50 mg/kg/day based on increased MNGs and reduced testes testosterone concentration in the fetal rat. Copyright © 2012 Elsevier Inc. All rights reserved.

  7. Temporary Restoration of Bull Trout Passage at Albeni Falls Dam, 2008 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bellgraph, Brian J. [Pacific Northwest National Laboratory

    2009-03-31

    The goal of this project is to provide temporary upstream passage of bull trout around Albeni Falls Dam on the Pend Oreille River, Idaho. Our specific objectives are to capture fish downstream of Albeni Falls Dam, tag them with combination acoustic and radio transmitters, release them upstream of Albeni Falls Dam, and determine if genetic information on tagged fish can be used to accurately establish where fish are located during the spawning season. In 2007, radio receiving stations were installed at several locations throughout the Pend Oreille River watershed to detect movements of adult bull trout; however, no bull trout were tagged during that year. In 2008, four bull trout were captured downstream of Albeni Falls Dam, implanted with transmitters, and released upstream of the dam at Priest River, Idaho. The most-likely natal tributaries of bull trout assigned using genetic analyses were Grouse Creek (N = 2); a tributary of the Pack River, Lightning Creek (N = 1); and Rattle Creek (N = 1), a tributary of Lightning Creek. All four bull trout migrated upstream from the release site in Priest River, Idaho, were detected at monitoring stations near Dover, Idaho, and were presumed to reside in Lake Pend Oreille from spring until fall 2008. The transmitter of one bull trout with a genetic assignment to Grouse Creek was found in Grouse Creek in October 2008; however, the fish was not found. The bull trout assigned to Rattle Creek was detected in the Clark Fork River downstream from Cabinet Gorge Dam (approximately 13 km from the mouth of Lightning Creek) in September but was not detected entering Lightning Creek. The remaining two bull trout were not detected in 2008 after detection at the Dover receiving stations. This report details the progress by work element in the 2008 statement of work, including data analyses of fish movements, and expands on the information reported in the quarterly Pisces status reports.

  8. Medical radiation exposure of pregnant and potentially pregnant women

    International Nuclear Information System (INIS)

    1977-07-01

    The present report clearly states that radiosensitivity is highest during intrauterine development and that the possibility of different types of effects depends on the state of pregnancy and on the dose. The decision whether an examination of the abdomen or pelvis of pregnant or potentiably pregnant women should be carried out is made clear that a delay of examinations due to dose reduction is only warranted if no danger to the patient and/or the unborn child is involved. (orig.) [de

  9. Sedentary behavior patterns in non-pregnant and pregnant women

    Directory of Open Access Journals (Sweden)

    Marquis Hawkins

    2017-06-01

    Full Text Available Sedentary behavior has been associated with adverse health outcomes among pregnant women; however, few studies have characterized sedentary behavior patterns in this population. We described patterns of accelerometer-determined indicators of sedentary behavior among a national sample of US pregnant (n = 234 women and non-pregnant (n = 1146 women participating in the NHANES 2003-06 cycles. We included women with ≥4 days of accelerometer wear of ≥10 h/day. A count threshold of <100 cpm was used to describe sedentary behavior as: 1 total accumulated sedentary time by bout length categories; 2 accumulated sedentary time within discrete bout length categories; 3 mean, median, and usual bout length; and 4 and bout frequency. Both non-pregnant and pregnant women spent up to 60% of their accelerometer wear time in sedentary behavior depending on the minimum bout threshold applied. Sedentary time was higher among pregnant women compared to non-pregnant women when lower bout thresholds (i.e. 10 min or less were applied. The majority of total sedentary time was accumulated in bouts lasting <10 min. The women averaged less than two prolonged sedentary bouts (i.e., ≥30 min per day, which accounted for nearly 20% of total accumulated sedentary time. When applying a minimum threshold of at least 15 min, sedentary time increased across pregnancy trimesters, while sedentary time was similar across trimesters when using lower thresholds. These findings provide the first characterization of accelerometer-determined indicators of sedentary behavior in pregnant women. The minimum bout threshold applied influenced estimates of sedentary time and patterns sedentary time accumulation across pregnancy trimesters.

  10. Acute headache diagnosis in pregnant women

    Science.gov (United States)

    Farmakidis, Constantine; Dayal, Ashlesha K.; Lipton, Richard B.

    2015-01-01

    Objective: To characterize demographic and clinical features in pregnant women presenting with acute headache, and to identify clinical features associated with secondary headache. Methods: We conducted a 5-year, single-center, retrospective study of consecutive pregnant women presenting to acute care with headache receiving neurologic consultation. Results: The 140 women had a mean age of 29 ± 6.4 years and often presented in the third trimester (56.4%). Diagnoses were divided into primary (65.0%) and secondary (35.0%) disorders. The most common primary headache disorder was migraine (91.2%) and secondary headache disorders were hypertensive disorders (51.0%). The groups were similar in demographics, gestational ages, and most headache features. In univariate analysis, secondary headaches were associated with a lack of headache history (36.7% vs 13.2%, p = 0.0012), seizures (12.2% vs 0.0%, p = 0.0015), elevated blood pressure (55.1% vs 8.8%, p headache history (OR 4.9, 95% CI 1.7–14.5) had an increased association with secondary headache, while psychiatric comorbidity (OR 0.13, 95% CI 0.021–0.78) and phonophobia (OR 0.29, 95% CI 0.09–0.91) had a reduced association with secondary headache. Conclusions: Among pregnant women receiving inpatient neurologic consultation, more than one-third have secondary headache. Diagnostic vigilance should be heightened in the absence of a headache history and if seizures, hypertension, or fever are present. Attack features may not adequately distinguish primary vs secondary disorders, and low thresholds for neuroimaging and monitoring for preeclampsia are justified. PMID:26291282

  11. Examining the safety of dental treatment in pregnant women.

    Science.gov (United States)

    Michalowicz, Bryan S; DiAngelis, Anthony J; Novak, M John; Buchanan, William; Papapanou, Panos N; Mitchell, Dennis A; Curran, Alice E; Lupo, Virginia R; Ferguson, James E; Bofill, James; Matseoane, Stephen; Deinard, Amos S; Rogers, Tyson B

    2008-06-01

    Although clinicians generally consider it safe to provide dental care for pregnant women, supporting clinical trial evidence is lacking. This study compares safety outcomes from a trial in which pregnant women received scaling and root planing and other dental treatments. The authors randomly assigned 823 women with periodontitis to receive scaling and root planing, either at 13 to 21 weeks' gestation or up to three months after delivery. They evaluated all subjects for essential dental treatment (EDT) needs, defined as the presence of moderate-to-severe caries or fractured or abscessed teeth; 351 women received complete EDT at 13 to 21 weeks' gestation. The authors used Fisher exact test and a propensity-score adjustment to compare rates of serious adverse events, spontaneous abortions/stillbirths, fetal/congenital anomalies and preterm deliveries ( .05) between women who received EDT and those who did not require this treatment, or between groups that received both EDT and periodontal treatment, either EDT or periodontal treatment alone, or no treatment. Use of topical or local anesthetics during root planing also was not associated with an increased risk of experiencing adverse outcomes. EDT in pregnant women at 13 to 21 weeks' gestation was not associated with an increased risk of experiencing serious medical adverse events or adverse pregnancy outcomes. Data from larger studies and from groups with other treatment needs are needed to confirm the safety of dental care in pregnant women. This study provides evidence that EDT and use of topical and local anesthetics are safe in pregnant women at 13 to 21 weeks' gestation.

  12. Ice interactions at a dam face

    Energy Technology Data Exchange (ETDEWEB)

    Morse, B.; Morse, J.; Beaulieu, P.; Pratt, Y. [Laval Univ., Quebec City, PQ (Canada). Dept. of Civil Engineering; Stander, E. [State Univ. of New York, Cobleskill College, Cobleskill, NY (United States). Dept. of Natural Sciences; Cote, A.; Tarras, A.; Noel, P. [Hydro-Quebec, Varennes, PQ (Canada). IREQ

    2009-07-01

    This paper reported on a joint research project between Laval University and Hydro-Quebec to study ice forces on dams in an effort to harmonize design criteria and develop mitigation strategies. This paper introduced the project and explored some of the preliminary results of the 2007-2008 field season. Ice displacement, ice stresses and ice forces on the LaGabelle dam were measured at several locations. The paper identified and discussed the complex relationships between data sets and discussed the spatial-temporal variability of the ice forces and its impact on design criteria. The project objective was to develop design criteria for ice forces on dams and to provide a scientific basis for interpreting and harmonizing existing recommended criteria. The methodology and site description were presented. It was concluded that the ice processes in a reservoir near a dam face subject to water fluctuations are quite complex. Therefore, in order to know the real average pressure on the dam, a significant amount of panels are required, having important implications for determining safe design values. 9 refs., 10 figs.

  13. Grouting of karstic arch dam foundation

    Energy Technology Data Exchange (ETDEWEB)

    Young, J.; Rigbey, S. [Acres International, Niagara Falls, ON (Canada)

    2002-07-01

    A 200 m high arch dam and a 2000 MW underground power house complex is under development in the Middle East. The project is located in a highly seismic area in rugged, mountainous terrain. The arch dam is constructed on good quality limestone and dolomitic limestone rock mass, but it contains several zones of disturbed or sheared rock. The basement rock is slightly karstic with hydraulic conductivities in the order of 100 Lugeons. In order to get a satisfactory foundation surface for the dam, it will be necessary to excavate extensively and backfill with concrete. Because of the presence of many clay infilled cavities and fractures, geotechnicians are considering the installation of a multiple row grout curtain to a depth of 150 m below the dam foundation to ensure adequate seepage and uplift parameters when the reservoir is impounded. Initial grouting water pressure test results suggested that the grouting and drainage curtain should be extended to the left abutment beyond the current design. However, when horizontal slide models of the dam abutment were developed using the finite element program SEEPW, it was shown that there is no benefit to extending the length of grout curtains unless they are tied to an area of much lower hydraulic conductivity much deeper in the abutment. 1 tab., 5 figs.

  14. Pregnant and other works

    Directory of Open Access Journals (Sweden)

    Elinor Carucci

    2013-01-01

    Full Text Available I have been photographing my children, Eden and Emmanuelle since I got pregnant in 2003. I photograph as a mother, from a mother's point of view, showing the different aspects of motherhood as I see them; the beautiful and the ugly, the magic and the frustration, the extremes that live side by side when you are a mother. I try to photograph them all. Crying, sadness, anxiety, mourning the body I will never have again, the woman I will never be again. The strong physical connection to the children, erotic at times, something I found out many mothers experience but do not talk about much. With my images I try to sing a love song to my children, they are my inspiration. Their love, sadness, joy and neediness are for me the most meaningful moments of my life, the moments I want to photograph and preserve. Those images are taken from my life, they are very personal, they are about being a mother, being a child, the intensity of raising a child. This work is about the essence of being human.

  15. Attention to impact pathways in EISs of large dam projects

    International Nuclear Information System (INIS)

    Brismar, Anna

    2004-01-01

    The importance of addressing cumulative environmental impacts in Environmental Impact Statements (EISs) of large development projects is increasingly underlined. However, cumulative impacts are generated through complex impact pathways, involving multiple root causes and lower and higher order effects, interlinked by cause-effect relationships. Consideration to potential impact pathways may thus be difficult without appropriate analytical methods, expertise, and supportive Environmental Impact Assessment guidelines and terms-of-references (TOR). This paper presents the results of an analysis of six EISs prepared for large dam projects between 1994 and 2001. The objective was to analyze if, how, and to what extent potential impact pathways involved in the generation of dam-related cumulative impacts have been addressed in the analyzed material. For this purpose, a theoretical framework was developed, which identifies four key root causes, their potential effects, and associated cause-effect relationships. The analysis revealed various shortcomings. Important imbalances were found in the degree of attention given to effects of different categories. Lower order effects received greater attention than higher order, and the potential effects of reservoir filling were more extensively attended to than those of flow blockage, storage, and regulation. Most importantly, little effort was made to carefully explain the potential impact pathways involved; root causes were often referred to in general terms only, and potential pathways leading up to an anticipated higher order effect or following upon an expected lower order effect were often inadequately addressed or ignored. Probable reasons for the discovered shortcomings are discussed and recommendations are presented for improving the World Bank EIA guidelines for large dam projects

  16. The lesser spotted pregnant surgeon.

    Science.gov (United States)

    Hamilton, L C

    2017-10-19

    With more women entering surgical training, it will become more commonplace to encounter pregnant surgeons. This paper discusses the evidence for work-related risk factors as well as outlining the rights of a pregnant doctor. There are, in fact, very few real risks to pregnancy encountered as a surgeon, with the main risks involving standing or sitting for long periods and fatigue, which can be managed with support from the department. It is important for women in surgery to know that it is possible to continue their training while pregnant so they do not feel pressured into changing to a less demanding specialty or even leaving medicine entirely. It is also important for other professionals to understand the risks and choices faced by pregnant surgeons so that they can better support them in the workplace.

  17. Pregnant Women and Influenza (Flu)

    Science.gov (United States)

    ... risk of serious flu complications, such as pregnant women. Treatment should begin as soon as possible because antiviral drugs work best when started early (within 48 hours after symptoms start). Antiviral drugs can make your ...

  18. Exposure of pregnant women working on cathodic screen VDTs

    International Nuclear Information System (INIS)

    Wolber, G.

    1985-01-01

    Because of the rapid proliferation of the use of video display units for data processing, we have investigated the levels of the personnel exposure to parasit X-rays emission from these devices. The case of pregnant women was investigated because the greater part of the staff involved is female. In the worst case, the dose equivalent received by the foetus at the most exposed point is estimated at 0,01 μSv. This level is too low to cause any pathology. There is, therefore, no reason to discard pregnant women from the use of video display units [fr

  19. Dams, Hydrology and Risk in Future River Management

    Science.gov (United States)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  20. The big issue: environment and large dams

    International Nuclear Information System (INIS)

    Rogers, Peter

    1999-01-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  1. The big issue: environment and large dams

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Peter [Harvard Univ. (United States)

    1999-09-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  2. Cleveland Dam East Abutment : seepage control project

    Energy Technology Data Exchange (ETDEWEB)

    Huber, F.; Siu, D. [Greater Vancouver Regional District, Burnaby, BC (Canada); Ahlfield, S.; Singh, N. [Klohn Crippen Consultants Ltd., Vancouver, BC (Canada)

    2004-09-01

    North Vancouver's 91 meter high Cleveland Dam was built in the 1950s in a deep bedrock canyon to provide a reservoir for potable water to 18 municipalities. Flow in the concrete gravity dam is controlled by a gated spillway, 2 mid-level outlets and intakes and 2 low-level outlets. This paper describes the seepage control measures that were taken at the time of construction as well as the additional measures that were taken post construction to control piezometric levels, seepage and piping and slope instability in the East Abutment. At the time of construction, a till blanket was used to cover the upstream reservoir slope for 200 meters upstream of the dam. A single line grout curtain was used through the overburden from ground surface to bedrock for a distance of 166 meters from the dam to the East Abutment. Since construction, the safety of the dam has been compromised through changes in piezometric pressure, seepage and soil loss. Klohn Crippen Consultants designed a unique seepage control measure to address the instability risk. The project involved excavating 300,000 cubic meters of soil to form a stable slope and construction bench. A vertical wall was constructed to block seepage. The existing seepage control blanket was also extended by 260 meters. The social, environmental and technical issues that were encountered during the rehabilitation project are also discussed. The blanket extension construction has met design requirements and the abutment materials that are most susceptible to internal erosion have been covered by non-erodible blanket materials such as plastic and roller-compacted concrete (RCC). The project was completed on schedule and within budget and has greatly improved the long-term stability of the dam and public safety. 2 refs., 8 figs.

  3. The acute toxicity and teratogenicity of nickel in pregnant rats

    International Nuclear Information System (INIS)

    Mas, A.; Holt, D.; Webb, M.

    1985-01-01

    The increased susceptibility of the pregnant rat to intraperitoneally administered nickel (Ni) is apparent at 12 and 19 days of pregnancy and cannot be due, therefore, to the increase in total body weight. Teratogenic malformations occur when Ni is administered during organogenesis and are maximal at dose levels that are toxic for the dam. The yolk sac and chorioallantoic placentas accumulate Ni, but this does not prevent the transport of the metal to the embryo or foetus. The Ni concentrations in the conceptuses decrease more slowly with time than those in the maternal organs. In the foetuses, the decrease in concentration is due to the increase in weight, since the content of Ni increases between 4 h and 24 h. Foetal uptake of ( 14 C)thymidine, ( 3 H)leucine and 65 Zn is unaffected at 3 h after the injection of the dam with 4 mg Ni/kg body wt. Incorporation of ( 3 H)leucine into foetal protein, but not the incorporation of ( 14 C)thymidine into DNA, is decreased at this time. A major effect of treatment with this teratogenic dose is an increase in the maternal plasma glucose concentration which, in turn, alters the supply of the sugar to the foetus. The possible relevance of temporary foetal hyperglycaemia to teratogenesis is discussed. (author)

  4. Hydroelectric dams need billions for rehab

    International Nuclear Information System (INIS)

    Carr, F.H.; Soast, A.

    1993-01-01

    Many of the Corps of Engineers older hydroelectric dams will require major rehabilitation over the next ten years. Preventive maintenance, repair work, and major rehabilitation of the Corp's hydro dams in inadequate because the revenue generated by sales of electricity, by law, is returned to the Treasury. Most multimillion dollar rehabilitation projects require specific approval for funding by Congress and securing it is a long and difficult process. It is hoped the funding problem will soon be addressed by the Clinton administration. Already, nearly one-sixth of the 2,154 Mw of hydro is unavailable because with hydro units are either out of service or operating at less than full capacity

  5. Official opening of the Olympic Dam project

    International Nuclear Information System (INIS)

    Parbo, A.

    1989-01-01

    This is the text of an address given on November 5, 1988 to mark the commencement of production of copper, uranium, gold and silver from the first stage of the Olympic Dam project at Roxby Downs, South Australia. The huge deposit was discovered in 1975 and years of exploration, underground development, metallurgical testing, planning and establishing the infrastructure followed, at a cost of $750 million. 740 people are now employed at Olympic Dam. The first shipment of copper and uranium oxide left for Sweden at the end of November 1988. The deposit is able to support a much higher production rate as the market for the products, particularly uranium, improves

  6. Dam safety at Seven Sisters Generating Station

    International Nuclear Information System (INIS)

    Carson, R. W.; Gupta, R. C.

    1996-01-01

    A safety surveillance program for all hydraulic structures in Manitoba was first implemented in 1979, and updated in 1988. This contribution describes the current status of the program, and the nature of the issues that the program was designed to address. The Seven Sisters Station's dam on the Winnipeg River, about 90 km northeast of the City of Winnipeg, was used as an example. Extensive reviews of flood risks and downstream inundation potential at Seven Sisters' revealed a number of deficiencies; these findings will be incorporated into a corporate plan of overall remediation. Updating the program will also include efforts to ensure adherence to national dam safety guidelines. 5 figs

  7. User's Guide: Arch Dam Stress Analysis System (ADSAS)

    National Research Council Canada - National Science Library

    1997-01-01

    .... ADSAS assumes linear elastic behavior for the entire dam, i.e. the dam is assumed to support the computed tensile stresses within the concrete mass and across the monolith joints without cracking or opening the joints...

  8. Inventory of Dams in the State of Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Permitted dams in Iowa and associated attributes, as recorded by the Floodplain Section of the DNR. The dams regulated are those with the parameters listed below: a....

  9. Computational Aspects of Dam Risk Analysis: Findings and Challenges

    Directory of Open Access Journals (Sweden)

    Ignacio Escuder-Bueno

    2016-09-01

    Full Text Available In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on “Computational Aspects of Analysis and Design of Dams.” In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, including downstream consequence assessments and the uncertainty of structural models.

  10. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Department of Resources — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  11. Dam-Break Flood Analysis Upper Hurricane Reservoir, Hartford, Vermont

    National Research Council Canada - National Science Library

    Acone, Scott

    1995-01-01

    .... Various dam break flood conditions were modeled and inundation maps developed. Based on this analysis the dam is rated a Class 2 or significant hazard category in terms of its potential to cause downstream damage...

  12. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Natural Resource Agency — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  13. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    Full Text Available Introduction: Cracking of earth dams is a one of the main threat causes of stability of embankment dams. In this research by modeling of the behavior of an embankment dam and employing conditions of the earthquake, the reasons of cracking were inspected using by modeling of earth dam behavior. Based on the literature, one of the main causes of dam failures is sliding and cracking of the dam structure during earthquake. Localized liquefaction of foundation soils was one of the causes of the observed post-earthquake distress within these dams. Material and Methods: In order to study the causes and the results of crack on earth dams, Mahmoodabad earthen dam with a height of 19 m, is located in Zanjan province, northwest of Iran, which suffered a longitudinal crack on the crest and slight sliding of the upstream slope due to 2001 Avaj earthquake was studied. This dam has faced earthquake two times with an interval of two years. During the first earthquake with the magnitude about 6.6 in Richter scale small longitudinal cracks had created on the crest. The developed cracks had been repaired by injecting the cement and then has been hidden by passing the time. After the second earthquake with the magnitude about 6.5 in Richter scale the hidden cracks had been appeared again and the slight movement of the upper slopes of dam reported. Based on the site investigation and documented information about dam, including maps and parameter data, the behavior of the dam has modeled by using Plaxis as a finite element model. In order to check the accuracy of the design of dam, the stability analysis has been conducted using by Xslope as a limit equilibrium model. The foundation conditions and the Geotechnical properties of the layer beneath the dam has been inspected by open excavation. Results and Discussion: Underground investigation about Geotechnical properties of dam foundation has showed that there is a thin sandy layer confined in alluvium material of the

  14. Health care to immigrant and Portuguese pregnant women in Portugal

    Directory of Open Access Journals (Sweden)

    Emília de Carvalho Coutinho

    2014-12-01

    Full Text Available This study aimed to assess the care received and the barriers faced by immigrants and Portuguese pregnant women in Portugal. This is an exploratory qualitative study, resorting to applying semi-structured interviews to 60 immigrant and 22 Portuguese women. Content analysis supported by QSR Nvivo10 program was used. The study was approved by an Ethics Committee. The results showed four categories related to affective dimensions-relational, cognitive, technical-instrumental and health care policy for pregnant women. As for the barriers in health care, these were mentioned by some of the expectant mothers, especially immigrant women. Almost all, both immigrant and Portuguese, pregnant women were satisfied with the health care.

  15. Underground dams for irrigation supplies in coastal limestone aquifer, Okinawa, Japan

    Science.gov (United States)

    Yasumoto, J.; Nakano, T.; Nawa, N.

    2011-12-01

    The use of underground dams to store water in regions with arid or tropical climates is a method that has received considerable attention in the last few decades. And now, for the tropical and subtropical islands that are highly vulnerable to climate change underground dams have been attracting attention again as a method of groundwater management. Okinawa Prefecture is Japan's southernmost prefecture, which consists of hundreds of islands in a chain over 1,000 km long, called the Ryukyu Islands which extend southwest from Kyushu to Taiwan. The national irrigation project of the Ryukyu Islands has been carried out, and several underground dams have been constructed. The Komesu and Giiza underground dams are first full scale underground dam facilities constructed for irrigation in Japan. The Komesu underground dam is a salt-water proof type. It prevents salt-water intrusion and provides storage fresh-water for irrigation in coastal limestone aquifer. Giiza underground dam is a dam up type for storage of fresh-water. These groundwater reservoirs are located in the coastal region of southern part of Okinawa (main island), where Ryukyu limestone is extensively distributed. We studied the behaviour of groundwater flow, saltwater intrusion and nitrate nitrogen (NO3-N) in groundwater in this region by using observation data of groundwater and springs through long term (from 1993 to 2010) monitoring. And, a groundwater flow and salt-water intrusion analysis have been conducted with three dimensional numerical model applied to these dam reservoir areas. The MODFLOW-NWT with SWI code and PEST was used to simulate the complex groundwater flow patterns. Through the comparison with simulation and observed data, it was concluded that the cut off wall of underground dams effectively stores the groundwater and prevents the salt-water intrusion in the reservoir areas. The observed groundwater levels at the reservoir areas were almost reproduced by the numerical model, but there

  16. Humoral immune responses of pregnant Guinea pigs Immunized with live attenuated Rhodococcus equi

    Directory of Open Access Journals (Sweden)

    Mawlood Abass Ali Al- Graibawi

    2018-02-01

    Full Text Available The potential to increase passive transfer of specific Rhodococcus equi (R.equi humoral immunity to newborn by preparturient vaccination of their dams was investigated in Pregnant Guinea pigs as a pilot study. Attenuated autogenous vaccine was prepared from a Congo red negative (CR- R.equi local isolate mixed with adjuvant (potassium alum sulphate, tested for sterility, safety and potency prior to vaccination .Two groups of pregnant G. pigs were used, the first group was vaccinated twice subcutaneously (S.C with the prepared vaccine at five and three weeks prior parturition, the second group was inoculated with adjuvant plus phosphate buffer saline (PBS twice s.c and kept as control. Offspring from the vaccinated dams had revealed high titers of specific R. equi antibody as detected by tube agglutination (TA and passive haemagglutination (PH test and showed protection against challenge dose. The results revealed that vaccination of pregnant G. pigs with the prepared attenuated vaccine was safe and efficient method to protect their offspring against experimental challenge with virulent R.equi. Vaccination was associated with increased humoral immune response in vaccinated group.

  17. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  18. Design and Construction of Dams, Reservoirs, and Balancing Lakes

    International Nuclear Information System (INIS)

    Lemperiere, F.

    2003-01-01

    The general data presented in sections two and three gives an idea of the extreme diversity of the millions of very large or very small dams worldwide. Dam design and construction methods for the most usual types of large dams are presented and justified in section four. The possibility and usefulness of building as many dams in the 21. century as have been built in the 20. is analyzed in section six. (author)

  19. Electronic warfare receivers and receiving systems

    CERN Document Server

    Poisel, Richard A

    2014-01-01

    Receivers systems are considered the core of electronic warfare (EW) intercept systems. Without them, the fundamental purpose of such systems is null and void. This book considers the major elements that make up receiver systems and the receivers that go in them.This resource provides system design engineers with techniques for design and development of EW receivers for modern modulations (spread spectrum) in addition to receivers for older, common modulation formats. Each major module in these receivers is considered in detail. Design information is included as well as performance tradeoffs o

  20. Influenza A (H1N1)pnd09 Vaccination of Pregnant Women and Immunological Consequences for Their Offspring

    DEFF Research Database (Denmark)

    Bischoff, Anne Louise

    2013-01-01

    against H1N1pnd09 according to the EMEA criteria with a HI titre of 40 or greater. Women receiving the non-adjuvanted vaccine had significantly fewer local reactions but similar rates of systemic reactions as women receiving the adjuvanted vaccine. There were no reports of serious adverse events in any......Pregnant women experience increased influenza related morbidity and mortality during seasonal influenza epidemics, and even graver outcomes during influenza pandemics. Thus, even though the huge amount of data on clinical efficacy and effectiveness of influenza vaccine in pregnant women......, there is limited information on the details of the immunological responses to influenza immunization in pregnant versus non-pregnant. We had the unique opportunity to study the H1N1pnd09 vaccination of pregnant and non-pregnant women in our unselected, prospective, clinical pregnancy-cohort: the Copenhagen...

  1. Influence of maternal dietary n-3 fatty acids on breast milk and liver lipids of rat dams and offspring - a preliminary study

    DEFF Research Database (Denmark)

    Hartvigsen, M.S.; Mu, Huiling; Høy, Carl-Erik

    2003-01-01

    The impact of triacylglycerol (TAG) structure and level of n-3 fatty acids on the fatty acid profile of total breast milk lipids and total liver phospholipids (PL) of dams and offspring (1, 3 and 13 weeks of age), when administered during development, was examined. Pregnant rats were fed experime......The impact of triacylglycerol (TAG) structure and level of n-3 fatty acids on the fatty acid profile of total breast milk lipids and total liver phospholipids (PL) of dams and offspring (1, 3 and 13 weeks of age), when administered during development, was examined. Pregnant rats were fed...... experimental diets from the 8(th) day of pregnancy throughout lactation. After weaning and until 13 weeks of age, the offspring were fed the same diet as their dams. The experimental diets contained either a specific structured oil, linseed oil or fish oil. In the specific structured oil, a-linolenic acid (18...... fatty acids. Samples from three animals in each group were analyzed. The highest level of 22:6n-3 in the breast milk was obtained with diets containing this fatty acid itself. The fatty acid profile of rat dam liver PL was very different from the milk lipids indicating that the maternal dietary fats...

  2. Seismic performance assessment of latyan concrete buttress dam ...

    African Journals Online (AJOL)

    In order to design earthquake resistant dams and evaluate the safety of existing dams that will be exposed to future earthquakes, it is essential to have accurate and reliable analysis procedures to predict the stresses and deformations in dams subjected to earthquake ground motion. For a damwater- foundation system, the ...

  3. The Grand Ethiopian Renaissance Dam and Ethiopia's Succession ...

    African Journals Online (AJOL)

    Tadesse Kassa Woldetsadik

    2013-06-01

    Jun 1, 2013 ... Dam concessions engendered detrimental impacts on Ethiopia's riparian rights ... control works on the Aswan High and the Roseires dams. Disturbed by the ... hegemonic control that would inevitably ensue from construction of the Dam ...... Projects Implementation Division AAAID, Sudan, p.1. 39 Ibid.

  4. Tenaga Nasional Berhad dam safety and surveillance program

    International Nuclear Information System (INIS)

    Jansen Luis; Zulkhairi Abd Talib

    2006-01-01

    This paper discusses the current practice of dam surveillance, which includes dam monitoring which is a process of visual inspections, measuring, processing, compiling and analyzing dam instrumentation data to determine the performance of a dam. The prime objective of the dam surveillance system is to ensure that any occurrence and development of safety deficiencies and problems are quickly detected, identified, analyzed and the required remedial actions are determined and consequently carried out in due time. In brief, the section is responsible to ensure that the dam monitoring and surveillance works are implemented as per scheduled and in accordance with the requirement and guidelines prepared by the dam designers and in accordance with international commission on large dams, ICOLD. The paper also illustrates and recommends an alternative approach for dam surveillance program using risk management approach, which is currently being actively adopted by some countries like USA, Canada, Australia and etc, towards improving the dam safety management and the decision making process. The approach provides a wider area of opportunity, improvements and benefits particular in the evaluation and modifications to the dam performance and safety. The process provides an effective and efficient tool for the decision makers and engineers through a comprehensive evaluation and a good understanding of the hazards, risks and consequences in relation to dam safety investigations. (Author)

  5. How to manage the cumulative flood safety of catchment dams ...

    African Journals Online (AJOL)

    Dam safety is a significant issue being taken seriously worldwide. However, in Australia, although much attention is being devoted to the medium- to large-scale dams, minimal attention is being paid to the serious potential problems associated with smaller dams, particularly the potential cumulative safety threats they pose ...

  6. Factors influencing hysteresis characteristics of concrete dam deformation

    Directory of Open Access Journals (Sweden)

    Jia-he Zhang

    2017-04-01

    Full Text Available Thermal deformation of a concrete dam changes periodically, and its variation lags behind the air temperature variation. The lag, known as the hysteresis time, is generally attributed to the low velocity of heat conduction in concrete, but this explanation is not entirely sufficient. In this paper, analytical solutions of displacement hysteresis time for a cantilever beam and an arch ring are derived. The influence of different factors on the displacement hysteresis time was examined. A finite element model was used to verify the reliability of the theoretical analytical solutions. The following conclusions are reached: (1 the hysteresis time of the mean temperature is longer than that of the linearly distributed temperature difference; (2 the dam type has a large impact on the displacement hysteresis time, and the hysteresis time of the horizontal displacement of an arch dam is longer than that of a gravity dam; (3 the reservoir water temperature variation lags behind of the air temperature variation, which intensifies the differences in the horizontal displacement hysteresis time between the gravity dam and the arch dam; (4 with a decrease in elevation, the horizontal displacement hysteresis time of a gravity dam tends to increase, whereas the horizontal displacement hysteresis time of an arch dam is likely to increase initially, and then decrease; and (5 along the width of the dam, the horizontal displacement hysteresis time of a gravity dam decreases as a whole, while the horizontal displacement hysteresis time of an arch dam is shorter near the center and longer near dam surfaces.

  7. Earthquake induced liquefaction analysis of Tendaho earth-fill dam ...

    African Journals Online (AJOL)

    fill dam, which is part of Tendaho Dam and Irrigation Project; the largest irrigation project in Ethiopia to date. The dam is located in the most seismic part of Ethiopia and was originally designed to be founded on potentially liquefiable alluvium ...

  8. Major dams of the United States, Geographic NAD83, USGS (2006) [dams00x020_USGS_2006

    Data.gov (United States)

    Louisiana Geographic Information Center — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  9. Health-related behaviors among pregnant women with hypertension

    Directory of Open Access Journals (Sweden)

    Agnieszka Maria Bień

    2017-01-01

    Full Text Available Introduction. The healthy and unhealthy behaviors of a pregnant woman influence both her own health and that of her unborn child, affecting its future development. The purpose of the study was to evaluate the health-related behaviors of pregnant women with hypertension.   Material i method. The study was performed between November 2011 and February 2012 and included 80 hypertensive pregnant women hospitalized in a high risk pregnancy ward. The study used a diagnostic survey with questionnaires. Results. Statistical analyses showed a correlation between the respondents’ health-related behaviors and their socio-demographic characteristics: exercise was correlated with age (p=0.01, and rest during the day was correlated with support in everyday responsibilities (p<0.00001, and with the respondents’ socio-economic standing (p=0.03. Correlations were also found between healthy eating habits and residence (0.006, education (p=0.05, and sodium intake (p=0.0003, as well as between education and substance use (p=0.0003. Conclusion. Health-related behaviors of pregnant women with hypertension are influenced by their education, support they receive in daily responsibilities, and their socio-economic standing. The diagnosis of hypertension in pregnant women does not necessarily prompt them to discontinue all unhealthy behaviors.

  10. HIV testing rates among pregnant women in Managua, Nicaragua, 2010-2011 Tasas de realización de pruebas de detección del VIH en mujeres embarazadas en Managua, Nicaragua, 2010-2011

    OpenAIRE

    Jonathan Colasanti; Marco Lorio Rugama; Karina Lifschitz; Manuel Largaespada; Benito Flores-Lopéz; Christopher Dodd; Daniel J. Feaster; Margaret Pereyra; Lisa R. Metsch

    2013-01-01

    OBJECTIVE: To determine and report the rate and pattern of HIV testing among pregnant women receiving ambulatory prenatal care, and the total number of positive cases in pregnant women in Managua, Nicaragua. METHODS: A retrospective epidemiological review was conducted to assess HIV testing rates among pregnant women in Managua attending district-level health centers in 2010 and 2011, with a focus on a single district (District 6.1). RESULTS: A total of 39.4% of pregnant women receiving prena...

  11. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  12. Investigation of geophysical methods for assessing seepage and internal erosion in embankment dams : a study of through-dam seismic testing at WAC Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Gaffran, P.; Jeffries, M. [BC Hydro, Burnaby, BC (Canada)

    2005-07-15

    Crosshole tomography is used to establish the distribution of seismic velocity between drill holes. The through-dam mode takes advantage of the triangular cross-section of earth embankments, obviating the need for drill holes. Seismic energy, generated on one face of the dam, passes underneath the crest and is detected by sensors arrayed on the opposite face. The sinkholes discovered at WAC Bennett Dam in 1996 provided an opportunity to test the procedure. Using p-wave energy, two series of measurements were conducted, notably one immediately before remediation of one sinkhole, and a second one shortly after the sinkhole was repaired. The known defect was successfully imaged by the first round of measurements. This report presented the results of an investigation of the through-dam seismic method using propagation of seismic waves through a dam from upstream to downstream, or vice-versa. The purpose of the study was to determine if this procedure could characterize the distribution of seismic velocity within a dam in an accurate and cost effective manner. The report presented the methods of velocity testing such as crosshole and downhole, and tomography; and through-dam measurements. Background to the Bennett Dam studies was also provided, with particular reference to the Bennett Dam sinkholes; sinkhole investigations; working hypothesis for sinkhole development; sinkhole number one characterization; and sinkhole remediation. An analysis of compression wave testing at Bennett Dam and shear wave testing was then offered. Other topics that were discussed included field test procedures; methodologies for data processing; p-waves versus s-waves; applicability of the research; and costs of through-dam surveys. It was concluded that under the right circumstances, through-dam seismic testing was capable of detecting changed conditions in an embankment dam. 15 refs., 2 tabs., 41 figs., 1 appendix.

  13. Primary Productivity of the Cengklik Dam Boyolali

    Directory of Open Access Journals (Sweden)

    WIRYANTO

    2002-01-01

    Full Text Available Primary productivity dynamic of the water ecosystem was conducted faster in the last decades. This study was intended to find out the primary productivity of Cengklik dam Boyolali, Central Java to explain the ecosystem dynamic and to lead the maintenance of dam. This study used quantitative methods in completely randomized group design (CRD, and the data was analized by Analysis of Variance (ANAVA. Samples were taken horizontally in four sampling point, respectively in the riparian zone, around of the floating net (“karamba”, in the center of dam water and around of the ex-paddy fields. There were taken vertically in three-depth point in each of the sampling point, respectively 0.5 meter, 1.5 meter, and 2.5 meter. The results showed that the gross primary productivity of the dam was 11.122.500-22.545.600 mgC/m3/days, and the primary productivity differences in each of the point sampling caused by light intensity, nutrient supply, and abundance of the chlorophyll organisms.

  14. The blues of 'Petit Saut' dam

    International Nuclear Information System (INIS)

    Nougaret, M.P.

    1994-01-01

    Great works of equipping get some bad consequences. It is the case of the hydro-electric dam of 'Petit-Saut' in french Guyana. Even if it is a case of renewable energy some questions appear about the destruction among the fauna and the flora

  15. Dam water quality study. Report to Congress

    International Nuclear Information System (INIS)

    1989-05-01

    The objective of the report is to identify water quality effects attributable to the impoundment of water by dams as required by Section 524 of the Water Quality Act of 1987. The document presents a study of water quality effects associated with impoundments in the U.S.A

  16. Modelling approach for gravity dam break analysis

    Directory of Open Access Journals (Sweden)

    Boussekine Mourad

    2016-09-01

    Full Text Available The construction of dams in rivers can provide considerable benefits such as the supply of drinking and irrigation water; however the consequences which would result in the event of their failure could be catastrophic. They vary dramatically depending on the extent of the inundation area, the size of the population at risk.

  17. Assessment of changes at Glen Canyon Dam

    International Nuclear Information System (INIS)

    Cherry, D.; McCoy, J.; Crandall, S.

    1991-01-01

    This paper describes the complexity associated with the assessment of financial impacts of proposed and actual short-term restrictions at Glen Canyon Dam. The reasons for these restrictions are discussed as well as the methods used to measure their financial impact to Western Area Power Administration

  18. Dam tot damloop : economische en maatschappelijke waarde

    NARCIS (Netherlands)

    de Nooij, Michiel; Horsselenberg, Peter

    2014-01-01

    Ruim 36.757 lopers (op de hoofdafstand!) en 115.000 bezoekers langs het parcours van het centrum van Amsterdam naar het centrum van Zaanstad, maakt de Dam tot damloop een groot evenement (het grootste hardloop evenement van Nederland) met een flinke impact op de (lokale) samenleving en economie. Dit

  19. Resilience scales of a dammed tropical river

    Science.gov (United States)

    Calamita, Elisa; Schmid, Martin; Wehrli, Bernhard

    2017-04-01

    Artificial river impoundments disrupt the seasonality and dynamics of thermal, chemical, morphological and ecological regimes in river systems. These alterations affect the aquatic ecosystems in space and time and specifically modify the seasonality and the longitudinal gradients of important biogeochemical processes. Resilience of river systems to anthropogenic stressors enables their recovery along the flow path; however little is known about the longitudinal distance that rivers need to partially restore their physical, chemical and biological integrity. In this study, the concept of a "resilience scale" will be explored for different water quality parameters downstream of Kariba dam, the largest artificial lake in the Zambezi basin (South-East Africa). The goal of this project is to develop a modelling framework to investigate and quantify the impact of large dams on downstream water quality in tropical context. In particular, we aim to assess the degree of reversibility of the main downstream alterations (temperature, oxygen, nutrients) and consequently the quantification of their longitudinal extent. Coupling in-situ measurements with hydraulic and hydrological parameters such as travel times, will allow us to define a physically-based parametrization of the different resilience scales for tropical rivers. The results will be used for improving future dam management at the local scale and assessing the ecological impact of planned dams at the catchment scale.

  20. Physicochemical characteristics of undrainable water dams utilized ...

    African Journals Online (AJOL)

    pH, electro-conductivity and total dissoved solutes (TDS) were measured in-situ from three reservoirs (Gathathini, Lusoi and Kianda dams) differing in their habitat characteristics. Water samples were collected for determination of the ionic concentartions of the reservoirs. Water quality status differed markedly between sites, ...

  1. 75 FR 49429 - Metal and Nonmetal Dams

    Science.gov (United States)

    2010-08-13

    ... internal water pressures. Pressures beyond a certain level would lead to structural instability. In the 18... foundation and embankment material strengths, and stability analyses to verify that the slopes of the dam..., rationales, benefits to miners, technological and economic feasibility, impact on small mines, and supporting...

  2. Expectations of immortality: dam safety management into the next millennium

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, M.D. [Tonkin and Taylor International Ltd., Auckland, (New Zealand)

    1999-07-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs.

  3. Dam risk reduction study for a number of large tailings dams in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Verma, N. [AMEC Earth and Environmental Ltd., Mississauga, ON (Canada); Small, A. [AMEC Earth and Environmental Ltd., Fredericton, NB (Canada); Martin, T. [AMEC Earth and Environmental, Burnaby, BC (Canada); Cacciotti, D. [AMEC Earth and Environmental Ltd., Sudbury, ON (Canada); Ross, T. [Vale Inco Ltd., Sudbury, ON (Canada)

    2009-07-01

    This paper discussed a risk reduction study conducted for 10 large tailings dams located at a central tailings facility in Ontario. Located near large industrial and urban developments, the tailings dams were built using an upstream method of construction that did not involve beach compaction or the provision of under-drainage. The study provided a historical background for the dam and presented results from investigations and instrumentation data. The methods used to develop the dam configurations were discussed, and remedial measures and risk assessment measures used on the dams were reviewed. The aim of the study was to address key sources of risk, which include the presence of high pore pressures and hydraulic gradients; the potential for liquefaction; slope instability; and the potential for overtopping. A borehole investigation was conducted and piezocone probes were used to obtain continuous data and determine soil and groundwater conditions. The study identified that the lower portion of the dam slopes were of concern. Erosion gullies could lead to larger scale failures, and elevated pore pressures could lead to the risk of seepage breakouts. It was concluded that remedial measures are now being conducted to ensure slope stability. 6 refs., 1 tab., 6 figs.

  4. Abortion and the pregnant teenager

    Science.gov (United States)

    Lipper, Irene; Cvejic, Helen; Benjamin, Peter; Kinch, Robert A.

    1973-01-01

    A study was carried out at the Adolescent Unit of The Montreal Children's Hospital from September 1970 to December 1972, the focus of which evolved from the pregnant teenager in general to the short- and long-term effects of her abortion. Answers to a questionnaire administered to 65 pregnant girls to determine the psychosocial characteristics of the pregnant teenager indicated that these girls are not socially or emotionally abnormal. A follow-up study of 50 girls who had an abortion determined that the girls do not change their life styles or become emotionally unstable up to one year post-abortion, although most have a mild, normal reaction to the crisis. During the study period the clinic services evolved from mainly prenatal care to mainly abortion counselling, and then to providing the abortion with less counselling, placing emphasis on those cases which require other than medical services. PMID:4750298

  5. Proceeding of the public safety around dams conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Canadian Dam Association hosted the Public Safety Around Dams workshop in which presentations were given in the morning to describe the different measures and methods implemented by the Ontario Ministry of Natural Resources, Ontario Power Generation and others to improve safety around dams. In the afternoon, the participants toured the Auburn and Lakefield dams and facilities to view the infrastructures and equipment. A roundtable discussion concluded the day. Following this workshop, a Public Safety Around Dams group was created on the social network site, LinkedIn. This conference featured 6 presentations, 3 of which have been catalogued separately for inclusion in this database.

  6. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are

  7. Risk and the pregnant body.

    Science.gov (United States)

    Lyerly, Anne Drapkin; Mitchell, Lisa M; Armstrong, Elizabeth Mitchell; Harris, Lisa H; Kukla, Rebecca; Kuppermann, Miriam; Little, Margaret Olivia

    2009-01-01

    Reasoning well about risk is most challenging when a woman is pregnant, for patient and doctor alike. During pregnancy, we tend to note the risks of medical interventions without adequately noting those of failing to intervene, yet when it's time to give birth, interventions are seldom questioned, even when they don't work. Meanwhile, outside the clinic, advice given to pregnant women on how to stay healthy in everyday life can seem capricious and overly cautious. This kind of reasoning reflects fear, not evidence.

  8. Seismic failure modes and seismic safety of Hardfill dam

    Directory of Open Access Journals (Sweden)

    Kun Xiong

    2013-04-01

    Full Text Available Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  9. Earthquake Hazard for Aswan High Dam Area

    Science.gov (United States)

    Ismail, Awad

    2016-04-01

    Earthquake activity and seismic hazard analysis are important components of the seismic aspects for very essential structures such as major dams. The Aswan High Dam (AHD) created the second man-made reservoir in the world (Lake Nasser) and is constructed near urban areas pose a high-risk potential for downstream life and property. The Dam area is one of the seismically active regions in Egypt and is occupied with several cross faults, which are dominant in the east-west and north-south. Epicenters were found to cluster around active faults in the northern part of Lake and AHD location. The space-time distribution and the relation of the seismicity with the lake water level fluctuations were studied. The Aswan seismicity separates into shallow and deep seismic zones, between 0 and 14 and 14 and 30 km, respectively. These two seismic zones behave differently over time, as indicated by the seismicity rate, lateral extent, b-value, and spatial clustering. It is characterized by earthquake swarm sequences showing activation of the clustering-events over time and space. The effect of the North African drought (1982 to present) is clearly seen in the reservoir water level. As it decreased and left the most active fault segments uncovered, the shallow activity was found to be more sensitive to rapid discharging than to the filling. This study indicates that geology, topography, lineations in seismicity, offsets in the faults, changes in fault trends and focal mechanisms are closely related. No relation was found between earthquake activity and both-ground water table fluctuations and water temperatures measured in wells located around the Kalabsha area. The peak ground acceleration is estimated in the dam site based on strong ground motion simulation. This seismic hazard analyses have indicated that AHD is stable with the present seismicity. The earthquake epicenters have recently took place approximately 5 km west of the AHD structure. This suggests that AHD dam must be

  10. GIS inundation mapping and dam breach analysis of Woolwich Dam using HEC-geoRAS

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada); Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-07-01

    A study was conducted to determine the extent of flood inundation given a hypothetical dam breach scenario of the Woolwich Dam located in the Grand River Watershed, 2.5 km north of the Town of Elmira, Ontario. The dam is operated by the Grand River Conservation Authority and was constructed to provide low-flow augmentation to Canagagigue Creek. Advances in the computational capabilities of numerical models along with the availability of fine resolution geospatial data has lead to significant advances in the evaluation of catastrophic consequences due to the ensuing flood waters when dams fail. The hydraulic models HEC-RAS and HEC-GeoRAS were used in this study along with GIS to produce high resolution spatial and temporal flood inundation mapping. Given the proximity to the Town of Elmira, the dam is classified as having a high hazard potential. The large size and high hazard potential of the dam suggests that the Inflow Design Flood (IDF) is the Probable Maximum Flood (PMF) event. The outlet structure of the spillway consists of 4 ogee-type concrete spillways equipped with radial gates. A low-level concrete pipe located within the spillway structure provides spillage for maintenance purposes. The full flow capacity of the spillway structure is 297 cubic metres per second at the full supply level of 364.8 metres. In addition to GIS flood inundation maps, this paper included the results of flood hydrographs, water surface profiles and peak flow data. It was concluded that techniques used in this analysis should be considered for use in the development of emergency management planning and dam safety assessments across Canada. 6 refs., 3 tabs., 4 figs.

  11. Effect of a dam on epilithic algal communities of a mountain stream: before-after dam construction comparison

    Directory of Open Access Journals (Sweden)

    Luciana Cibils Martina

    2013-02-01

    Full Text Available In this study we evaluated the effect of a dam on epilithic algal communities by analyzing community response after dam construction and by comparing community composition, structure and biomass upstream and downstream of the dam. Samples of epilithic algae and environmental data were collected at each site during high and low water periods before and after dam construction in Achiras Stream (Córdoba, Argentina. Ordinations showed modifications in algal assemblages after dam construction and downstream of the dam. Ordinations also suggested a loss of seasonality at the downstream site since the assemblages were similar between hydrological periods after dam construction. Indicator species, obtained by the Indicator Value method, showed that, after dam construction, there could have been an increase in nutrient concentration and a release of plankton from the impoundment. Abundance, richness and diversity were altered after dam construction as assessed by ANOVAs derived from a modified BACI Design. Proportion of early-successional species was higher at the upstream site while late-successional species were dominant at the downstream site, as predicted. Lower fluctuations in discharge downstream of the dam may have helped succession advance, whereas at the upstream site, mainly during the high water period, floods could have caused sloughing of life forms from the outer layers of the biofilm, resetting the algal community to early successional stages. It may be concluded that the dam affected algal community and favored succession advance mainly by reducing current velocity and flow fluctuations.

  12. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    Science.gov (United States)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  13. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    Science.gov (United States)

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs.

  14. Nutrition and the Pregnant Teen.

    Science.gov (United States)

    James, Vicki; McCamey, Jody

    This illustrated guide for pregnant teenagers discusses the nutritional needs of the mother and her unborn child in a month-by-month format. The information presented for each of the 9 months typically includes a sample daily menu; a checklist of recommended servings per day for each of four food groups; a description of the usual emotional and…

  15. INFECTIOUS MYXOMATOSIS (SANARELLI) IN PREGNANT RABBITS

    Science.gov (United States)

    Sprunt, Douglas H.

    1932-01-01

    Pregnancy in rabbits alters the reactivity of the tissues to the virus of infectious myxomatosis. The livers of pregnant animals with the myxoma have a central acidophilic necrosis. Secondary lesions in the lungs are much more numerous and larger in the pregnant than in the non-gravid animals. In like manner the lesions in the spleen are more extensive in the pregnant rabbit. On the other hand the skin lesions of the pregnant animal are decreased in size. PMID:19870088

  16. Innovative reregulation weirs for dam releases

    International Nuclear Information System (INIS)

    Hauser, G.E.; Shane, R.M.; Niznik, J.A.; Brock, W.G.

    1991-01-01

    In this paper two different reregulation weir designs for dam release improvement are discussed. A porous timber crib is favored for applications where increased minimum flow is needed, and a labyrinth with vertical walls is favored where both minimum flow and aeration are needed. Weirs constructed below hydropower dams can improve minimum flows between generating periods and increase tailwater dissolved oxygen (DO) content during generation. TVA has developed two distinct functional designs: a timber crib weir for minimum flow and a labyrinth weir for minimum flow and aeration. A target minimum flow is sustained by slow drainage of the weir pool between periodic refills. With the labyrinth weir, aeration occurs during generation via overtopping. Both weirs are designed to maximize the value of the tailwater while minimizing backwater on the upstream turbine, unsafe hydraulic conditions, and environmental disturbance

  17. Gestational weight gain information: seeking and sources among pregnant women

    OpenAIRE

    Willcox, Jane C.; Campbell, Karen J.; McCarthy, Elizabeth A.; Lappas, Martha; Ball, Kylie; Crawford, David; Shub, Alexis; Wilkinson, Shelley A.

    2015-01-01

    Background Promoting healthy gestational weight gain (GWG) is important for preventing obstetric and perinatal morbidity, along with obesity in both mother and child. Provision of GWG guidelines by health professionals predicts women meeting GWG guidelines. Research concerning women?s GWG information sources is limited. This study assessed pregnant women?s sources of GWG information and how, where and which women seek GWG information. Methods Consecutive women (n?=?1032) received a mailed que...

  18. Receiver Test Selection Criteria

    Science.gov (United States)

    2015-03-12

    The DOT requests that GPS manufacturers submit receivers for test in the following TWG categories: - Aviation (non-certified), cellular, general location/navigation, high precision, timing, networks, and space-based receivers - Each receiver should b...

  19. Perencanaan Check Dam Sungai Dawe Kudus

    OpenAIRE

    Mustaanah, Adibatul; Pinandoyo, Nur; Sugiyanto, Sugiyanto; Wahyuni, Sri Eko

    2013-01-01

    Juana river's located in two administrative regions Kudus and Pati had superficial. This is because the slope of the river is quite gentle and the level of environmental degradation in the watershed (DAS) Juana river's have increased. Based on these conditions, it is necessary to plan the construction of sediment control (check dams) to reduce sedimentation along the river and optimize the function of the Juana river's. Planning is performed on Dawe river's ,the branch of Juana river's. From ...

  20. Excavation of the Surikamigawa dam diversion tunnel. Surikamigawa dam karihaisui tunnel kantsu

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, T.; Konno, T. (Ministry of Construction, Tokyo (Japan))

    1994-04-01

    A bypass tunnel construction has been completed at the Surikamigawa dam (Japan). This paper describes the summary of the construction. The full-swing dam construction work is scheduled to begin in 1995. The soils distributed near the dam site consist of lapillus tuff containing andesite-based light stones and tuff-based conglomerates containing large gravels. Excavation of the dam diversion tunnel has used a blasting method, and the tunnel construction has adopted an automatic tunnel cross section marking system and a non-electric explosion method. This marking system is a system to irradiate a laser beam onto the facing to depict excavation lines that realizes labor saving and high-accuracy excavation. The error at the tunnel completion was found 20 mm. The non-electric explosion method ignites a coated explosive layer with an impact wave, which is electrostatically safe, and reduces blasting vibration. Electric detonators have also been used because of using ANFO explosives. The result obtained from measurements of inner space displacement necessary for the blasting process has indicated that the area near the dam site consists of stable mountains. 6 figs., 4 tabs.

  1. Comparison of rocuronium-induced neuromuscular blockade in second trimester pregnant women and non-pregnant women.

    Science.gov (United States)

    Jun, I J; Jun, J; Kim, E M; Lee, K Y; Kim, N; Chung, M H; Choi, Y R; Choi, E M

    2018-05-01

    This study set out to compare the onset and duration of rocuronium-induced neuromuscular blockade in second trimester pregnant women and non-pregnant women receiving general anesthesia. Forty-seven pregnant (Group P) and forty-seven non-pregnant (Group C) women were enrolled. Anesthesia was induced with propofol 2.0 mg/kg and rocuronium 0.6 mg/kg, and neuromuscular blockade was assessed with an accelerometric sensor using train-of-four stimulation (TOF-Watch® SX). Tracheal intubation was performed at maximum depression of the first twitch (T1) and anesthesia was maintained with sevoflurane 1.5-2.5% and 50% oxygen in air. We recorded the times to maximum T1 depression and 5% and 25% T1 recovery, as well as the mean arterial pressure and heart rate at baseline, injection of rocuronium, intubation, and 5% and 25% T1 recovery. The onset of rocuronium-induced neuromuscular blockade (time to maximum T1 depression) did not differ significantly between the groups. The duration (time to 25% T1 recovery) was significantly longer in Group P than in Group C (45.7 ± 12.9 min vs 40.6 ± 10.4 min, P rocuronium-induced neuromuscular blockade did not significantly differ in onset but lasted significantly longer in second trimester pregnant women compared with non-pregnant women. Copyright © 2018 Elsevier Ltd. All rights reserved.

  2. Three Sisters Dam: Investigations and monitoring

    International Nuclear Information System (INIS)

    Slopek, R.J.; Courage, L.J.R.; Keys, R.A.

    1990-01-01

    The geotechnical investigations, monitoring and interpretation of data associated with the evaluation of the Three Sisters Dam, which has been suffering from excessive seepage and is in need of enhancement, are outlined. The Three Sisters Dam is located in the continental ranges of the Rocky Mountains in Alberta, impounding the Spray Reservoir, and is founded on 60 m of interbedded sand, gravel, silt and clay layers. The computer code PC-SEEP was used to evaluate seepage. Details are provided of drilling, ground-penetrating radar surveys, seismic surveys, penstock inspection, sinkhole activity, piezometer monitoring, silt wells, settlement monuments, and tailrace monitoring. The intensive investigations of the foundations showed that they consist of a complex formation of interfingered stratified layers and leases of talus and glaciofluvial deposits. Due to the depth and nature of these materials drill hole penetration was limited to the use of the Becker hammer. This equipment successfully delineated the major soil horizons of the foundation. The continued information attained from inspection, drilling, testing, radar surveys, seismic work, monitoring of piezometers, leakage, silt wells and settlement monuments indicated that there are no large voids within the foundation of the dam. 2 refs., 12 figs

  3. Dam spills and fishes; Eclusees et poissons

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.).

  4. Sediment Transport Over Run-of-River Dams

    Science.gov (United States)

    O'Brien, M.; Magilligan, F. J.; Renshaw, C. E.

    2016-12-01

    Dams have numerous documented effects that can degrade river habitat downstream. One significant effect of large dams is their ability to trap sediment delivered from upstream. This trapping can alter sediment transport and grain size downstream - effects that often motivate dam removal decisions. However, recent indirect observations and modeling studies indicate that small, run-of-river (ROR) dams, which do not impede discharge, may actually leak sediment downstream. However, there are no direct measurements of sediment flux over ROR dams. This study investigates flow and sediment transport over four to six different New England ROR dams over a summer-fall field season. Sediment flux was measured using turbidity meters and tracer (RFID) cobbles. Sediment transport was also monitored through an undammed control site and through a river where two ROR dams were recently removed. These data were used to predict the conditions that contribute to sediment transport and trapping. Year 1 data show that tracer rocks of up to 61 mm were transported over a 3 m ROR dam in peak flows of 84% of bankfull stage. These tracer rocks were transported over and 10 m beyond the dam and continue to move downstream. During the same event, comparable suspended sediment fluxes of up to 81 g/s were recorded both upstream and downstream of the dam at near-synchronous timestamps. These results demonstrate the potential for sediment transport through dammed rivers, even in discharge events that do not exceed bankfull. This research elucidates the effects of ROR dams and the controls on sediment transport and trapping, contributions that may aid in dam management decisions.

  5. Langbjorn dam : adaptation for safe discharge of extreme floods

    Energy Technology Data Exchange (ETDEWEB)

    Yang, J. [Vattenfall Research and Development, Alvkarleby (Sweden); Ericsson, H.; Gustafsson, A. [SWECO, Stockholm (Sweden); Stenmark, M. [Vattenfall Power Consultant, Ludvika (Sweden); Mikaelsson, J. [Vattenfall Nordic Generation, Bispgarden (Sweden)

    2007-07-01

    The Langbjorn hydropower scheme, composed of an embankment dam with an impervious core of compacted moraine, a spillway section and a powerhouse, is located on the Angermanalven River in north Sweden. The scheme was commissioned in 1959 and is owned by Vattenfall. As part of its dam safety program, Vattenfall plans to adapt and refurbish many of its dams to the updated design-flood and dam-safety guidelines. Langbjorn is classified as a high hazard dam, as its updated design flood is 30 per cent higher than the existing spillway capacity. Safety evaluations were conducted for the Langbjorn dam, and, as required by the higher safety standard, there was a need to rebuild the dam, so that the design flood could be safely released without causing failure of the dam. This paper provided information on the Langbjorn hydropower scheme and discussed the planned rebuilding measures. For example, the design flood was accommodated by allowing a temporary raise of the water level by 1.3 metres above the legal retention reservoir level, which required heightening and reinforcement of the dam. Specifically, the paper discussed measures to increase the discharge capacity; handling and control of floating debris; improvement and heightening of impervious core in left and right connecting dam and abutment; measures to increase the stability of the left steep riverbank; and measures to increase stability of the spillway monoliths and the left guide wall. In addition, the paper discussed measures to ensure stability of the downstream stretch of the river bank and increase instrumentation. The paper also presented the results of hydraulic investigations to investigate the risk of erosion downstream of the dam. It was concluded that the dam could discharge the design flood and that the stability of the dam was improved and judged to be satisfactory during all foreseeable conditions. 2 refs., 8 figs.

  6. Automatic dam concrete placing system; Dam concrete dasetsu sagyo no jidoka system

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, Y; Hori, Y; Nakayama, T; Yoshihara, K; Hironaka, T [Okumura Corp., Osaka (Japan)

    1994-11-15

    An automatic concrete placing system was developed for concrete dam construction. This system consists of the following five subsystems: a wireless data transmission system, an automatic dam concrete mixing system, a consistency determination system, an automatic dam concrete loading and transporting system, and a remote concrete bucket opening and closing system. The system includes the following features: mixing amount by mixing ratio and mixing intervals can be instructed from a concrete placing site by using a wireless handy terminal; concrete is mixed automatically in a batcher plant; a transfer car is started, and concrete is charged into a bucket automatically; the mixed concrete is determined of its properties automatically; labor cost can be reduced, the work efficiency improved, and the safety enhanced; and the system introduction has resulted in unattended operation from the aggregate draw-out to a bunker line, manpower saving of five persons, and reduction in cycle time by 10%. 11 figs., 2 tabs.

  7. Dam failure analysis/calibration using NWS models on dam failure in Alton, New Hampshire

    International Nuclear Information System (INIS)

    Capone, E.J.

    1998-01-01

    The State of New Hampshire Water Resources Board, the United States Geological Service, and private concerns have compiled data on the cause of a catastrophic failure of the Bergeron Dam in Alton, New Hampshire in March of 1996. Data collected related to the cause of the breach, the breach parameters, the soil characteristics of the failed section, and the limits of downstream flooding. Dam break modeling software was used to calibrate and verify the simulated flood-wave caused by the Bergeron Dam breach. Several scenarios were modeled, using different degrees of detail concerning the topography/channel-geometry of the affected areas. A sensitivity analysis of the important output parameters was completed. The relative importance of model parameters on the results was assessed against the background of observed historical events

  8. The pregnant female surgical resident

    Directory of Open Access Journals (Sweden)

    Shifflette V

    2018-05-01

    Full Text Available Vanessa Shifflette,1 Susannah Hambright,2 Joseph Darryl Amos,1 Ernest Dunn,3 Maria Allo4 1Associates in Surgical Acute Care, Methodist Dallas Medical Center, Dallas, TX, USA; 2Methodist Surgical Associates, Methodist Dallas Medical Center, Dallas, TX, USA; 3Graduate Medical Education - General Surgery, Methodist Dallas Medical Center, Dallas, TX, USA; 4Santa Clara Valley Medical Center, San Jose, CA, USA Background: Surgery continues to be an intense, time-consuming residency. Many medical students decide against surgery as a profession due to the long work hours and family strain. The pregnant female surgical resident has an added stress factor compared to her male counterpart. Methods: We distributed an electronic, online 26-question survey to 32 general surgery programs in the southwestern region of the United States. Each program distributed our survey to the female surgical residents who had been pregnant during residency in the last 5 years. Each program was re-contacted 6 weeks after the initial contact. Most questions were in a 5-point Likert scale format. The responses were collected and analyzed using the Survey Monkey website. Results: An unvalidated survey was sent to 32 general surgery programs and 26 programs responded (81%. Each program was asked for the total number of possible responses from female residents that met our criteria (60 female residents. Seven of the programs (27% stated that they have had zero residents pregnant. We had 22 residents respond (37%. Over half of the residents (55% were pregnant during their 2nd or 3rd year of residency, with only 18% pregnant during a research year. Thirty-one percent had a lower American Board of Surgery In-Training Exam (ABSITE score. Ninety percent of the residents were able to take 4 weeks or more for maternity leave. Most of the residents (95% stated that they would do this again during residency given the opportunity, but many of the residents felt that returning back to work

  9. [Asymptomatic bacteriuria among pregnant women. An underestimated threat].

    Science.gov (United States)

    Quiroga-Feuchter, Germán; Robles-Torres, Rosa Evangelina; Ruelas-Morán, Andrés; Gómez-Alcalá, Alejandro V

    2007-01-01

    Urinary tract infection is a common pregnancy complication. Asymptomatic bacteriuria (AB) can trigger the development of serious complications affecting both the mother and the fetus. Determine the frequency of AB among pregnant women attending to antenatal care at the family medicine clinic number 1 of the Instituto Mexicano del Seguro Social, located in Ciudad Obregón, Sonora. A longitudinal study was carried out from September to December 2004. Seventy-two 72 pregnant women with gestational age of 24 weeks or less were followed up during four months. All pregnant women were selected by a non-probabilistic method. Every patient had a monthly urine culture during the follow up period. Among the 72 pregnant women, 16.7% developed symptomatic urinary infections during the follow-up and 25% had at least one positive urine culture without urinary symptoms, being classified as AB, thus receiving treatment. Frequency of positive urine cultures was common at first and fourth months of follow-up. Urine culture is an important component of prenatal care, and helps in identifying a significant number of urinary tract infections that would go otherwise undetected.

  10. How big of an effect do small dams have? Using geomorphological footprints to quantify spatial impact of low-head dams and identify patterns of across-dam variation

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Costigan, Katie H.; Daniels, Melinda D.

    2015-01-01

    Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.

  11. Organ distribution of 137Cs in mouse fetuses and their dams

    International Nuclear Information System (INIS)

    Matsusaka, Naonori; Yamakawa, Yoji; Sato, Itaru; Tsuda, Shuji; Kobayashi, Haruo; Nishimura, Yoshikazu.

    1997-01-01

    A single dose of 137 Cs was given intravenously to pregnant mice on day 17 of gestation, and organ distribution of this nuclide in mouse fetuses and their dams was studied by measuring radioactivity and by macroautoradiography. Fetal uptake of 137 Cs was 0.8% of the initial dose 24 h after administration; about 11% of the initial dose was incorporated in litter during the same period. Concentrations of 137 Cs in fetal organs were 0.4-0.8%/g 24 h after administration, whereas concentrations in dams' organs were in a range of 2-6%/g. Therefore, concentrations in maternal organs such as liver, spleen, kidneys and muscle were 4-6 times higher than those in fetuses. Among the maternal organs, the salivary gland represented the highest concentration of 25%/g 1 h after administration to 6.4%/g 24 h after administration. This remarkable uptake in the salivary gland should be emphasized because of its close location to the thyroid gland in experimental animals and humans. Macroautoradiograms supported the findings obtained by measuring radioactivity in the organs. Macroautoradiograms in color may facilitate visual understanding of organ distribution of this nuclide. (author)

  12. Characterization of landslide dams in the San Juan province (Argentina)

    Science.gov (United States)

    Penna, Ivanna; Longchamp, Celine; Derron, Marc-Henri; Jaboyedoff, Michel

    2013-04-01

    River blockages caused by landslide deposition are common phenomena in active mountain chains, influencing erosion-sedimentation patterns and acting as primary and secondary hazards. Regional scale analyses regarding their spatial distribution and morphometry allow establishing boundary conditions for their occurrence and stability, and determine differences among regions with different landscape and climatic conditions. Owing to the combination of endogenous and exogenous factors, landslide dams are frequent phenomena in the Andes. In the Argentinean NW and the Patagonian Andes, previous studies showed that stability of landslide dams determined by morphometric parameters generally matched satisfactorily with dam behavior, with some exceptions in which climatic component played an important role in dam longevity. Aiming to expand the knowledge of landslide dams in the Argentinean Andes, in this work we analyzed the stability of rock avalanche dams in the Pampeam flat slab subduction zone. In the study area, mountain dynamics creates suitable conditions for the occurrence of 34 rock avalanches with volumes up to 0.3 km3. They developed in deeply carved valleys (Cordillera) and Inter-thrust valleys (Precordillera). 22 impoundments of rivers resulted from channelized rock avalanches with long runouts (4-10 km) that blocked tributaries rivers, but most of them by rock avalanches that filled the valley bottom, with run up in the opposite slope and limited movement parallel to the valley axis. Most of the dams breached in unknown times, except for the last event that occurred on November 12th 2005. The quantification of morphometric parameters and contributing areas indicates the existence of dams with dimensionless blockage index above 2.75 (stable domain) and below 3.08 (instable domain). The Los Erizos dam in our study area and the Barrancas dam in the Patagonian Andes show that besides morphometric parameters, climatic conditions are decisive. Stable landslide dams

  13. Towards a dams safety management system for Angola

    OpenAIRE

    Camilo, V.; Silva, A.; Costa, R.; Barateiro, J.; Portela, E. A.; Fonseca, J.

    2015-01-01

    Dams have contributed to the human development and have brought many benefits, such as delivering hydropower, irrigating agricultural fields, supplying drinking water, or just for navigational and recreational purposes. Nevertheless, dams are critical structures that raise multiple concerns and risks associated with the ecological, social and economic impact. Angola has a rich and complex network of water basins and dams that serves different strategic purposes as defined in it...

  14. Oral hygiene practices and dental service utilization among pregnant women.

    Science.gov (United States)

    Boggess, Kim A; Urlaub, Diana M; Massey, Katie E; Moos, Merry-K; Matheson, Matthew B; Lorenz, Carol

    2010-05-01

    Daily oral hygiene and regular dental visits are important components of oral health care. The authors' objective in this study was to examine women's oral hygiene practices and use of dental services during pregnancy. The authors developed a written oral health questionnaire and administered it to 599 pregnant women. They collected demographic information, as well as data on oral hygiene practices and use of dental services during pregnancy. They used chi2 and multivariable logistic regression models to assess associations between oral hygiene practice and dental service use during pregnancy and to identify maternal predictor variables. Of the 599 participants, 83 percent (n=497) reported brushing once or twice per day. Twenty-four percent (n=141) reported flossing at least once daily; Hispanic women were more likely to floss than were white or African American women (28 percent [52 of 183] versus 22 percent [54 of 248] versus 19 percent [23 of 121], respectively, Pdental care during pregnancy. Hispanic women were significantly less likely than were black or white women to receive routine dental care during pregnancy (13 percent versus 21 percent versus 36 percent, respectively, Pdental care when not pregnant were significantly associated with lack of routine dental care during pregnancy (adjusted odds ratios, 95 percent confidence intervals: 2.56 [1.33-4.92]; 2.19 [1.11-4.29]; 2.02 [1.12-3.65]; 1.86 [1.13-3.07]; and 4.35 [2.5-7.69], respectively). A woman's lack of receiving routine dental care when not pregnant was the most significant predictor of lack of receiving dental care during pregnancy. Racial, ethnic and economic disparities related to oral hygiene practices and dental service utilization during pregnancy exist. Medical and dental care providers who treat women of reproductive age and pregnant women need to develop policy strategies to address this population's access barriers to, and use of, dental care services.

  15. Domestic Violence Among Pregnant Women.

    Science.gov (United States)

    Habib, Sadia; Abbasi, Nasreen; Khan, Bushra; Danish, Nargis; Nazir, Quratulain

    2018-01-01

    Domestic violence during pregnancy is an important social & health issue in all societies. In Muslim world and particularly underdeveloped countries, domestic violence is often under reported. It is the need of hour to encourage reporting of such events & implementation of research-based policies for prevention of women abuse & support of the victims of domestic violence (DV). The objective of this study was to highlight this neglected social problem of our society & to identify at risk population. This is a cross sectional study conducted at Ayub Teaching Hospital & Benazir Bhutto Shaheed Teaching Hospital, Abbottabad (January 2014 to December. 2016). Pregnant women were inquired regarding history of abuse by husband and sociodemographic characteristics were noted in a Performa to analyse the risk factors for domestic violence. The overall prevalence was found to be 35%. Out of 1000 pregnant women, 270 (27%) suffered from simple violence and 60 (6%) were victims of grievous assault. Violence among pregnant women is found to be more prevalent among residents of urban areas, women of older age being uneducated & belonging to poor socioeconomic status. Domestic violence during pregnancy is a common & often neglected psychosocial health problem. High risk population needs to be identified so that preventive strategies can be planned & implemented.

  16. Disposition of inorganic mercury in pregnant rats and their offspring

    Science.gov (United States)

    Oliveira, Cláudia S.; Joshee, Lucy; Zalups, Rudolfs K.; Pereira, Maria E.; Bridges, Christy C.

    2015-01-01

    Environmental toxicants such as methylmercury have been shown to negatively impact fetal health. Despite the prevalence of inorganic mercury (Hg2+) in the environment and the ability of methylmercury to biotransform into Hg2+, little is known about the ability of Hg2+ to cross the placenta into fetal tissues. Therefore, it is important to understand the handing and disposition of Hg2+ in the reproductive system. The purpose of the current study was to assess the disposition and transport of Hg2+ in placental and fetal tissues, and to test the hypothesis that acute renal injury in dams can alter the accumulation of Hg2+ in fetal tissues. Pregnant Wistar rats were injected intravenously with 0.5 or 2.5 μmol kg−1 HgCl2 for 6 or 48 h and the disposition of Hg2+ was measured. Accumulation of Hg2+ in the placenta was rapid and dose-dependent. Very little Hg2+ was eliminated during the initial 48 h after exposure. When dams were exposed to the low dose of HgCl2, fetal accumulation of Hg2+ increased between 6 h and 48 h, while at the higher dose, accumulation was similar at each time point. Within fetal organs, the greatest concentration of Hg2+ (nmol/g) was localized in the kidneys, followed by the liver and brain. A dose-dependent increase in the accumulation of Hg2+ in fetal organs was observed, suggesting that continued maternal exposure may lead to increased fetal exposure. Taken together, these data indicate that Hg2+ is capable of crossing the placenta and gaining access to fetal organs in a dose-dependent manner. PMID:26196528

  17. Isotope technique in JPS dam surveillance: its potential

    International Nuclear Information System (INIS)

    Sabri Hassan

    2006-01-01

    Controlling seepage is one of the most important requirements for safe dams. Any leakage at an earth embankment may be potentially dangerous since rapid internal erosion may quickly enlarge an initially minor defect. Thus dam owners need to have thorough surveillance programs that can forewarn of impending problems from seepage or other factors influencing the safety of dams. In carrying out dam surveillance works, all possible efforts should be considered and foreseeing the potential of isotope technique, JPS (Department of Irrigation and Drainage, Malaysia) and MINT (Malaysian Institute for Nuclear Technology Research) participated actively in the UNDP/RCA/IAEA program under RAS/8/093 project sponsored by the International Atomic Energy Agency (IAEA). Through these activities, it was noted that the technique demonstrated very promising potentials such as in assisting dam site selections, site investigations, watershed studies, dam and reservoir design, leakage investigations and sediments related issues, the two latter ones being relatively critical during the operational life of the dam. Establishment of baseline isotopic characteristics (or fingerprint), hydrochemistry, electrical conductivity and temperature profiles is underway for all JPS dams to be later utilized in diagnosing seepage related issues it is suggested that application of this technique be extended to other dam owners nationwide. (Author)

  18. Fish Passage Through Dams on the Upper Mississippi River

    National Research Council Canada - National Science Library

    Wilcox, Daniel

    1999-01-01

    .... I identified UMR migratory fish species, estimated current velocities through gate openings on UMR dams, compiled information on migration behavior, and estimated the swimming for north performance...

  19. Engineers find climbing techniques work well for dam inspections

    Energy Technology Data Exchange (ETDEWEB)

    O`Shea, M.; Graves, A. [Bureau of Reclamation, Denver, CO (United States)

    1996-10-01

    Climbing techniques adopted by the Bureau of Reclamation to inspect previously inaccessible or difficult to reach features at dams are described. Following the failure of the steel radial-arm gate at Folsom Dam, engineers mounted an effort to reach and inspect the dam`s seven other spillway gates. This close-up examination was performed to: (1) determine the condition of these gates; and (2) gather clues about the failure of the one gate. The access techniques described involved mountaineering techniques, as opposed to high scaling techniques, performed with dynamic and static nylon kermantle ropes.

  20. Detection of Water Leaks in Beni-Haroun Dam (Algeria)

    International Nuclear Information System (INIS)

    Hocini, N.; Mami, M.

    2011-01-01

    The main objective of this work was to detect water leakage origin combining conventional, tracing and isotope techniques. The investigation was performed by a research team from the 'Algiers Nuclear Research Centre' in collaboration with engineers from the 'National Agency for Dams'. The chemical and isotopic results have shown no influence of dam water on the water sampled at the piezometers and drains that are present in the close neighbourhood of the dam. However, the water flowing at drain D15 has exhibited the nearest quality to that dam. Dye tracing has shown a water circulation through complex pathways for the left bank. (author)

  1. Differences in pandemic influenza vaccination policies for pregnant women in Europe

    Directory of Open Access Journals (Sweden)

    Marnoch Gordon J

    2011-10-01

    Full Text Available Abstract Background An important component of the policy to deal with the H1N1 pandemic in 2009 was to develop and implement vaccination. Since pregnant women were found to be at particular risk of severe morbidity and mortality, the World Health Organization and the European Centers for Disease Control advised vaccinating pregnant women, regardless of trimester of pregnancy. This study reports a survey of vaccination policies for pregnant women in European countries. Methods Questionnaires were sent to European competent authorities of 27 countries via the European Medicines Agency and to leaders of registries of European Surveillance of Congenital Anomalies in 21 countries. Results Replies were received for 24 out of 32 European countries of which 20 had an official pandemic vaccination policy. These 20 countries all had a policy targeting pregnant women. For two of the four countries without official pandemic vaccination policies, some vaccination of pregnant women took place. In 12 out of 20 countries the policy was to vaccinate only second and third trimester pregnant women and in 8 out of 20 countries the policy was to vaccinate pregnant women regardless of trimester of pregnancy. Seven different vaccines were used for pregnant women, of which four contained adjuvants. Few countries had mechanisms to monitor the number of vaccinations given specifically to pregnant women over time. Vaccination uptake varied. Conclusions Differences in pandemic vaccination policy and practice might relate to variation in perception of vaccine efficacy and safety, operational issues related to vaccine manufacturing and procurement, and vaccination campaign systems. Increased monitoring of pandemic influenza vaccine coverage of pregnant women is recommended to enable evaluation of the vaccine safety in pregnancy and pandemic vaccination campaign effectiveness.

  2. Environmental impacts of small dams on agriculture and ground water development: a case study of Khan pur Dam, Pakistan

    International Nuclear Information System (INIS)

    Ejaz, N.; Shahmim, M.A.; Elahi, A.; Khan, N.M.

    2012-01-01

    The water scarcity issues are increasing through out the world. Pakistan is also facing water crises and its water demands are increasing every day. During this research it is investigated that small dams are playing an important role for the sustainability of groundwater and agriculture. The main objective of this study was to assess the environmental impacts of small dam on agricultural and ground water. Proper planning and management of small dams may improve the sustainable agriculture in Pakistan. It is also concluded that small dams are significantly contributing towards economy, environment, local climate, recreational activities and crop production. Small dams can also be utilized for the production of electricity at local level. On the other hand, water management issues can be resolved by the involvement of local farmer's associations. Water losses through seepage, unlined channels and old irrigation methods are most critical in developing world. Considering the overall positive environmental impacts, construction of small dams must be promoted. (author)

  3. Transfer of Ga-67 from hamster dam to fetus and offspring

    International Nuclear Information System (INIS)

    Hayes, R.L.; Byrd, B.L.

    1981-01-01

    We have studied the transfer of Ga-67 from the hamster dam to the fetus and also to the postpartum offspring. During gestation the concentration of Ga-67 in the mammary glands increased by approximately 20-fold, and Ga-67 was transferred across the placenta into the fetus. The concentration of Ga-67 in the fetus decreased during the terminal stages of gestation, partly due to a decreased transfer of Ga-67 itself and partly as the result of the rapid growth of the fetus. One-day-old offspring were able to absorb from the gastrointestinal tract the Ga-67 contained in ingested dam's milk, whereas 9-day-old offspring excrete essentially all such ingested Ga-67. The Ga-67 radiation hazards to the fetus during gestation and that resulting from the transfer of Ga-67 to the newborn through ingestion of the mother's milk should receive further investigation

  4. Transfer of Ga-67 from hamster dam to fetus and offspring

    International Nuclear Information System (INIS)

    Hayes, R.L.; Byrd, B.L.

    1981-01-01

    The transfer of Ga-67 from the hamster dam to the fetus and to the postpartum offspring has been studied. During gestation the concentration of Ga-67 in the mammary glands increased by approximately 20-fold, and Ga-67 was transferred across the placenta into the fetus. The concentration of Ga-67 in the fetus decreased during the terminal stages of gestation, partly due to a decreased transfer of Ga-67 itself and partly as the result of the rapid growth of the fetus. One-day-old offspring were able to absorb from the gastrointestinal tract the Ga-67 contained in ingested dam's milk, whereas 9-day-old offspring excreted essentially all such ingested Ga-67. The Ga-67 radiation hazards to the fetus during gestation and that resulting from the transfer of Ga-67 to the newborn through ingestion of the mother's milk should receive further investigation

  5. Monitoring health in African dams : the Kamburu dam (Kenya) as a test case

    NARCIS (Netherlands)

    J.M.V. Oomen

    1981-01-01

    textabstractDams are among the obvious efforts to improve the economic situation in a developing country. They aim at using locally available natural resources. At present they are among the most popular means for promoting socio-economic development. A significant number of these programmes have

  6. Dam Design can Impede Adaptive Management of Environmental Flows: A Case Study from the Opuha Dam, New Zealand

    Science.gov (United States)

    Lessard, JoAnna; Murray Hicks, D.; Snelder, Ton H.; Arscott, David B.; Larned, Scott T.; Booker, Doug; Suren, Alastair M.

    2013-02-01

    The Opuha Dam was designed for water storage, hydropower, and to augment summer low flows. Following its commissioning in 1999, algal blooms (dominated first by Phormidium and later Didymosphenia geminata) downstream of the dam were attributed to the reduced frequency and magnitude of high-flow events. In this study, we used a 20-year monitoring dataset to quantify changes associated with the dam. We also studied the effectiveness of flushing flows to remove periphyton from the river bed. Following the completion of the dam, daily maximum flows downstream have exceeded 100 m3 s-1 only three times; two of these floods exceeded the pre-dam mean annual flood of 203 m3 s-1 (compared to 19 times >100 m3 s-1 and 6 times >203 m3 s-1 in the 8 years of record before the dam). Other changes downstream included increases in water temperature, bed armoring, frequency of algal blooms, and changes to the aquatic invertebrate community. Seven experimental flushing flows resulted in limited periphyton reductions. Flood wave attenuation, bed armoring, and a shortage of surface sand and gravel, likely limited the effectiveness of these moderate floods. Floods similar to pre-dam levels may be effective for control of periphyton downstream; however, flushing flows of that magnitude are not possible with the existing dam infrastructure. These results highlight the need for dams to be planned and built with the capacity to provide the natural range of flows for adaptive management, particularly high flows.

  7. Environmental design of the Olympic Dam operations

    International Nuclear Information System (INIS)

    Middleton, B.A.

    1989-01-01

    Environmental Design of The Olympic Dam Operations has been required to take into account the Environmental Management Programme as approved by the South Australian Government and radiological protection standards as determined by the Commonwealth of Australia's Code of Practice on Radiation Protection in the Mining and Milling of Radioactive Ores 1987. The article describes the natural environment, project assessment and infrastructure relating to the environmental design. The radiological standards refer to the control of exposure to radiation above naturally occurring background levels both for employees and for members of the public. 2 tabs., maps

  8. Social impacts of Brazil's Tucurui Dam

    International Nuclear Information System (INIS)

    Fearnside, P.M.

    1999-01-01

    The Tucurui Dam, which blocked the Tocantins River in 1984 in Brazil's eastern Amazonian state of Para, is a continuing source of controversy. Most benefits of the power go to aluminum smelting companies, where only a tiny amount of employment is generated. Often presented by authorities as a model for hydroelectric development because of the substantial power that it produces, the project's social and environmental impacts are also substantial. Examination of Tucurui reveals a systematic overestimation of benefits and underestimation of impacts as presented by authorities. Tucurui offers many as-yet unlearned lessons for hydroelectric development in Amazonia

  9. Cryptogamous plants lining the dam encircling Szeged

    Energy Technology Data Exchange (ETDEWEB)

    Galle, L

    1973-01-01

    Szeged, S. Hungary, is surrounded by an 8 km long dam covered with bricks, its surface 50,000 sq. m., the angle of inclination 45/sup 0/. On the brick surface there live 36 lichen species belonging to four lichen associations, nine moss and one algal species. The paper deals with the enumeration of cryptogamous coenoses, the growth form of the plants, the degree of annual growth of 5 various lichen species and the effect of the pollution of town air. The extent of coverage and the fructification of the single species are of lower degree in the coenoses in regions of more polluted air. 6 references, 2 tables.

  10. The environment of the Olympic Dam project

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The Olympic Dam uranium/copper/gold project at Roxby Downs, South Australia, has a harsh environment with high summer temperatures, low rainfall and poor quality soils. There are no natural water courses. The vegetation is dominated by annual grasses in summer and wildflowers in winter. Red kangaroos are the most commonly sighted native mammals. The Fat-tailed Dunnart a nocturnal carniverous marsupial, is found. Eighty three bird species have been recorded. Reptiles are numerous and one amphibian occurs. A vermin eradication program aimed at rabbit control is conducted. ills

  11. Telephone Smoking Cessation Quitline Use Among Pregnant and Non-pregnant Women

    OpenAIRE

    Bombard, Jennifer M.; Farr, Sherry L.; Dietz, Patricia M.; Tong, Van T.; Zhang, Lei; Rabius, Vance

    2013-01-01

    To describe characteristics, referrals, service utilization, and self-reported quit rates among pregnant and non-pregnant women enrolled in a smoking cessation quitline. This information can be used to improve strategies to increase pregnant and non-pregnant smokers’ use of quitlines. We examined tobacco use characteristics, referral sources, and use of services among 1,718 pregnant and 24,321 non-pregnant women aged 18–44 years enrolled in quitline services in 10 states during 2006–2008. We ...

  12. Studies on the fate of poisonous metals in experimental animal. III. Distribution and transference of /sup 115m/Cd in pregnant rat and fetus

    Energy Technology Data Exchange (ETDEWEB)

    Omori, Y; Takanaka, A; Onoda, K; Nakaura, S; Urakubo, G [National Inst. of Hygienic Sciences, Tokyo (Japan)

    1975-08-01

    Distribution of sup(115m)Cd in pregnant rat, transference to fetus and distribution in fetal organs were investigated by means of intraveneous injection of sup(115m)CdCl/sub 2/ solution to dam at 20th day after mating, dissection at 1 hr later and measurement of radioactivities. In the pregnant rat, the thickest accumulation of radioactivity in liver, and much thicker concentration in pancreas, pituitary, kidney and adrenal than in blood were found. Besides, 24.6% of dose remained in gastrointestinal tract. The transference of sup(115m)Cd to fetus was not so remarkable. Concerning the distribution of partially transfered metal in fetus, outstanding accumulation were observed in adrenal, spleen and testis, and secondly thicker concentrations were seen in liver and bone. The distribution pattern in fetus was not similar to that of dam, and rather thicker concentrations of sup(115m)Cd were observed in fetal spleen, bone, adrenal and brain, comparing with the corresponding organs of dam. In conclusion, cadmium introduced in dam body was transfered partially to fetus through placenta and was distributed in many parts of fetal body.

  13. The World Commission on Dams + 10: Revisiting the Large Dam Controversy

    Directory of Open Access Journals (Sweden)

    Deborah Moore

    2010-06-01

    Full Text Available The World Commission on Dams (WCD was an experiment in multi-stakeholder dialogue and global governance concerned with a subject area – large dams – that was fraught with conflict and controversy. The WCD Report, Dams and Development: A New Framework for Decision-Making, was published in 2000 and accompanied by hopes that broad-based agreements would be forged on how to better manage water and energy development. Ten years later, this special issue of Water Alternatives revisits the WCD and its impacts, exploring the question: Is the WCD still relevant? The editorial team and the Guest Editors of this special issue of Water Alternatives have selected a range of 20 papers, 6 viewpoints, and 4 book reviews that help to illustrate the evolution in the dams debate. The goal of this special issue is to examine the influence and the impacts of the WCD on the dam enterprise, in general, and on the policies and practices of key stakeholders and institutions, and on the development outcomes for affected communities and environments, in particular. In this introduction, the Guest Editors provide an overview of the special issue, exploring the new drivers of dam development that have emerged during the last decade, including climate change and new financiers of dams, and describing the themes emerging from this diverse set of papers and viewpoints. This special issue demonstrates the need for a renewed multi-stakeholder dialogue at multiple levels. This would not be a redo of the WCD, but rather a rekindling and redesigning of processes and forums where mutual understanding, information-sharing, and norm-setting can occur. One of the most promising developments of the last decade is the further demonstration, in case studies described here, that true partnership amongst key stakeholders can produce transformative resource-sharing agreements, showing that many of the WCD recommendations around negotiated decision making are working in practice. We hope

  14. Effect of zinc oxide nanoparticles on dams and embryo–fetal development in rats

    Directory of Open Access Journals (Sweden)

    Hong J

    2014-12-01

    Full Text Available Jeong-Sup Hong,1,2 Myeong-Kyu Park,1 Min-Seok Kim,1 Jeong-Hyeon Lim,1 Gil-Jong Park,1 Eun-Ho Maeng,1 Jae-Ho Shin,3 Yu-Ri Kim,4 Meyoung-Kon Kim,4 Jong-Kwon Lee,5 Jin-A Park,2 Jong-Choon Kim,6 Ho-Chul Shin2 1Health Care Research Laboratory, Korea Testing and Research Institute, Gimpo, 2College of Veterinary Medicine, Konkuk University, Seoul, 3Department of Biomedical Laboratory Science, Eulji University, Seongnam-si, 4Department of Biochemistry and Molecular Biology, Korea University Medical School and College, Seoul, 5Toxicological Research Division, National Institute of Food and Drug Safety Evaluation, Chungcheongbuk-do, 6College of Veterinary Medicine, Chonnam National University, Gwangju, Korea Abstract: This study investigated the potential adverse effects of zinc oxide nanoparticles (ZnOSM20[-] NPs; negatively charged, 20 nm on pregnant dams and embryo–fetal development after maternal exposure over the period of gestational days 5–19 with Sprague Dawley rats. ZnOSM20(- NPs were administered to pregnant rats by gavage at 0 mg/kg/day, 100 mg/kg/day, 200 mg/kg/day, and 400 mg/kg/day. All dams were subjected to caesarean section on gestational day 20, and all the fetuses were examined for external, visceral, and skeletal alterations. Toxicity in the dams manifested as significantly decreased body weight at 400 mg/kg/day and decreased liver weight, and increased adrenal glands weight at 200 mg/kg/day and 400 mg/kg/day. However, no treatment-related difference in the number of corpora lutea, the number of implantation sites, the implantation rate (%, resorption, dead fetuses, litter size, fetal deaths, fetal and placental weights, and sex ratio were observed between the groups. Morphological examinations of the fetuses demonstrated no significant difference in the incidences of abnormalities between the groups. No significant difference was found in the Zn content of fetal tissue between the control and high-dose groups. These results showed

  15. Costa Rica's Presentation to the 1st Workshop on Problems of Leakage in Dams

    International Nuclear Information System (INIS)

    Cordero Calderon, C.F.

    1994-03-01

    This paper includes information about the Instituto Costarricense de Electricidad (ICE); the project T racer Application to Leakage in Dams; the description of the Cachi's Dam and the description of the Arenal's Dam. (S. Grainger)

  16. Thermal monitoring of leakage through Karkheh embankment dam, Iran

    Energy Technology Data Exchange (ETDEWEB)

    Mirghasemi, A.A.; Bagheri, S.M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering; Heidarzadeh, M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering]|[Mahab Ghodss Consulting Engineers, Tehran (Iran, Islamic Republic of)

    2007-07-01

    A newly developed and simple method for monitoring seepage in embankment dams was presented. The method of temperature measurement is based on the fact that a change in permeability results in a change in seepage flow, thereby causing a temperature change that can be readily measured in the dam body and foundation. In this study, water leaking through the Karkheh embankment dam was thermally analyzed to determine a pattern and amount of water seepage. With nearly 33 million cubic metres of fill, the Karkheh earth and rock-fill dam is the largest dam in Iran. Construction was completed in 2000. The thermal processes in the embankment were studied due to the dam's complex thermo-hydraulic behaviour. Thermal data was collected and analyzed during construction and operation of the dam. This paper presented the temperature variations for the different dam zones, including core, upstream shell, downstream shell, upstream filter, downstream filter and the plastic concrete cut-off wall. It was determined that the clay core works very well as an impermeable curtain. It was also shown that temperature variations of the Karkheh reservoir water is seasonal, and decrease as water depth increases. The reservoir water temperature remains constant beyond depths of 60 metres. The thermal behaviour of the core is not similar to that of the reservoir, indicating a very low value of seepage through the core. The pattern of temperature variations in the upstream shell in the left abutment is harmonic, while in the right abutment it is not harmonic. A harmonic pattern of temperature variation exists in some aquifers of the dam foundation, indicating high seepage through these aquifers. The Karkheh dam cut-off wall performs satisfactorily. It was determined that one dimensional equations for estimating seepage cannot be applied for the Karkheh dam. 17 refs., 11 figs.

  17. So near, yet so far: tobacco dependence treatment for pregnant women.

    Science.gov (United States)

    Barker, Dianne; Orleans, Tracy; Halpin, Helen; Barry, Matthew

    2004-04-01

    Almost one-half million babies in the United States are born yearly to women who report smoking while pregnant. Almost all of these pregnant women have access to prenatal care, through federally financed health clinics, state and county health programs, or private providers. However, many pregnant smokers are unlikely to receive any type of counseling or assistance to help them stop smoking--despite the availability of evidence-based treatment and the considerable return on investment. This article recommends four next steps to ensure that tobacco dependence treatment is available for all pregnant women. These steps are (a). expanding Medicaid coverage for, and promotion of, effective counseling services for pregnant smokers, (b). improving health care systems by building the capacity of prenatal providers and health care systems to deliver effective treatments, (c). encouraging purchasers of private and public health benefit packages to demand coverage for, and promotion of, effective counseling services for pregnant smokers, and (d). redirecting state resources to ensure a statewide system of care for pregnant smokers. Implementation of these steps requires leadership, diligence, and action by the public health community--as well as ongoing monitoring to assess progress in improving coverage, capacity, and coordination.

  18. A flexible WLAN receiver

    NARCIS (Netherlands)

    Schiphorst, Roelof; Hoeksema, F.W.; Slump, Cornelis H.

    2003-01-01

    Flexible radio receivers are also called Software Defined Radios (SDRs) [1], [2]. The focus of our SDR project [3] is on designing the front end, from antenna to demodulation in bits, of a °exible, multi-standard WLAN receiver. We try to combine an instance of a (G)FSK receiver (Bluetooth) with an

  19. Thermal effects of dams in the Willamette River basin, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites

  20. Integrated wireless sensor network for monitoring pregnant women.

    Science.gov (United States)

    Niţulescu, Adina; Crişan-Vida, Mihaela; Stoicu-Tivadar, Lăcrămioara; Bernad, Elena

    2015-01-01

    The paper presents an integrated monitoring system for pregnant women in the third trimester using a mobile cardiotocograph and body sensors. The medical staff has a useful tool to detect abnormalities and prevent unfortunate events in time. The mobile cardiotocograph sends data in real time to a Smartphone that communicates the information in a cloud. The physician accesses the data using the hospital ObgGyn application. The advantage of using this system is that the pregnant woman can follow her pregnancy status evolution from home, and the physician receives alarms from the system if the data is not in normal range and has available information about the health status at any time and location.

  1. Mobile Application for Pregnant Women: What Do Mothers Say?

    Science.gov (United States)

    Sommer, Janine; Daus, Mariana; Smith, María; Luna, Daniel

    2017-01-01

    Today, health information technologies are constantly expanding and changing, allowing more and more people to use different mobile applications to receive information and control their health condition. Based on the need to implement an application for pregnant women in the Personal Health Record (PHR) of Hospital Italiano de Buenos Aires (HIBA), an Australian survey was carried out to measure the use and utility of a pregnancy application (pregnancy app). Our results were broadly in agreement with the reference values. The survey was distributed through social networks (Facebook and Twitter) during September 2016. We obtained 235 responses from Spanish-speaking women, mostly Argentinian. In conclusion, it could be observed that a pregnancy app offers the possibility of a greater follow-up and provides reassurance to the pregnant women who use it.

  2. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison HA; Harnish, Ryan A.; Jones, Bryan W.; Hanson, Amanda C.; Trott, Donna M.; Greiner, Michael J.; McMichael, Geoffrey A.; Ham, Kenneth D.; Deng, Zhiqun; Brown, Richard S.; Weiland, Mark A.; Li, X.; Fu, Tao

    2014-03-28

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile

  3. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison H.A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jones, Bryan W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanson, Amanda C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Trott, Donna M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mcmichael, Geoffrey A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Brown, Richard S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xinya [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-15

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile

  4. Cognitive factors associated with the willingness for HIV testing among pregnant women in China.

    Science.gov (United States)

    Li, Chunrong; Yang, Liu; Kong, Jinwang

    2014-01-01

    The spread of human immunodeficiency virus/acquired immunodeficiency syndrome (HIV/AIDS) epidemic in the worldwide trend is not contained effectively. The pregnant women infected HIV seriously in the high HIV epidemic areas in China. The transmission of HIV to child may be cut off if HIV positive mother was found early by HIV testing. Pregnant women mandatorily received the HIV counseling and testing services. Most of them did not know the knowledge about HIV prevention and were not willing to receive HIV testing actively. Willingness for HIV testing among pregnant women was investigated, which can help to promote them to take up HIV testing actively. This study assessed the prevalence of the willingness for HIV testing and cognitive factors associated with it. A cross-sectional survey was conducted to 500 pregnant women via face-to-face interviews with anonymous structured questionnaire guided by the Health Belief Model (HBM). The prevalence of the willingness for HIV testing was 58.60%. Perceived higher susceptibility to HIV (multivariate-adjusted odds ratio (ORm) = 2.02, 95% confidence interval (CI): 1.40-5.06), more knowledge for HIV (ORm = 1.92, 95% CI: 1.11-3.87) and perceived less social stigma (ORm = 0.80, 95% CI: 0.34-0.91) were associated with higher willingness for HIV testing among pregnant women. To prevent HIV mother to children transmission, it is necessary to enhance knowledge for HIV, change cognitive factors and increase willingness for HIV testing among pregnant women.

  5. Pregnant teenagers' group: contributions to prenatal care.

    Science.gov (United States)

    Queiroz, Maria Veraci Oliveira; Menezes, Giselle Maria Duarte; Silva, Thaís Jormanna Pereira; Brasil, Eysler Gonçalves Maia; Silva, Raimunda Magalhães da

    2017-06-05

    To describe changes in nurses' care following the implementation of a group of pregnant teenagers in prenatal care based on the expectations and experiences of pregnant teenagers. Qualitative and descriptive study conducted from February to November 2013 at a Primary Care Unit in Fortaleza, Ceará, Brazil, through focus groups with 16 adolescents from the group of pregnant women in the second or third trimester of pregnancy. The analysis identified central ideas and units of meanings that formed the categories. The strategy of a group of pregnant teenagers, which provides a space for coexistence and the establishment of ties encourages these individuals to talk about their needs, re-signifying their ties. Educational strategies to promote self-care of pregnant teenagers and care for their babies involve the sharing of experiences, doubts and beliefs. Considerations and suggestions of the adolescents contributed to guide nurses' practice and provide a strategic space of care and support for pregnant adolescents in primary care.

  6. Travel Characteristics and Pretravel Health Care Among Pregnant or Breastfeeding U.S. Women Preparing for International Travel.

    Science.gov (United States)

    Hagmann, Stefan H F; Rao, Sowmya R; LaRocque, Regina C; Erskine, Stefanie; Jentes, Emily S; Walker, Allison T; Barnett, Elizabeth D; Chen, Lin H; Hamer, Davidson H; Ryan, Edward T

    2017-12-01

    To study characteristics and preventive interventions of adult pregnant and breastfeeding travelers seeking pretravel health care in the United States. This cross-sectional study analyzed data (2009-2014) of pregnant and breastfeeding travelers seen at U.S. travel clinics participating in Global TravEpiNet. Nonpregnant, nonbreastfeeding adult female travelers of childbearing age were used for comparison. We evaluated the prescription of malaria chemoprophylaxis and antibiotics for this population as well as the administration of three travel-related vaccines: hepatitis A, typhoid, and yellow fever. We also evaluated use of tetanus toxoid, reduced diphtheria toxoid, and acellular pertussis and influenza vaccines, because these are widely recommended in pregnancy. Of 21,138 female travelers of childbearing age in Global TravEpiNet, 170 (0.8%) were pregnant and 139 (0.7%) were breastfeeding. Many traveled to destinations endemic for mosquito-borne illnesses, including malaria (pregnant: 95%; breastfeeding: 94%), dengue (pregnant: 87%; breastfeeding: 81%), or yellow fever (pregnant: 35%; breastfeeding: 50%). Compared with nonpregnant, nonbreastfeeding adult female travelers, eligible pregnant travelers were less likely to be vaccinated against hepatitis A (28% compared with 51%, Ptravelers did not receive influenza vaccination. Yellow fever vaccine was occasionally provided to pregnant and breastfeeding travelers traveling to countries entirely endemic for yellow fever (6 [20%] of 30 pregnant travelers and 18 [46%] of 39 breastfeeding travelers). Half of pregnant travelers and two thirds of breastfeeding travelers preparing to travel to malaria-holoendemic countries received a prescription for malaria prophylaxis. Most pregnant and breastfeeding travelers seen for pretravel health consultations traveled to destinations with high risk for vector-borne or other travel-related diseases. Destination-specific preventive interventions were frequently underused.

  7. Highly Sensitive Optical Receivers

    CERN Document Server

    Schneider, Kerstin

    2006-01-01

    Highly Sensitive Optical Receivers primarily treats the circuit design of optical receivers with external photodiodes. Continuous-mode and burst-mode receivers are compared. The monograph first summarizes the basics of III/V photodetectors, transistor and noise models, bit-error rate, sensitivity and analog circuit design, thus enabling readers to understand the circuits described in the main part of the book. In order to cover the topic comprehensively, detailed descriptions of receivers for optical data communication in general and, in particular, optical burst-mode receivers in deep-sub-µm CMOS are presented. Numerous detailed and elaborate illustrations facilitate better understanding.

  8. Community involvement in dam breach exercises

    International Nuclear Information System (INIS)

    Cattanach, J.D.; Macdonald, E.G.; Mulligan, K.M.

    1993-01-01

    In 1986 British Columbia Hydro made a commitment to perform annual dam failure simulations based on the Emergency Preparedness Plans. Over the last 7 years nine such exercises have been completed. Each year the level of complexity of the exercises has increased, and along with it, the number of organizations outside of B.C. Hydro that participate in the exercise events has also increased. There has been a shift in attitudes, both internally and externally, towards these exercises. It is described how British Columbia Hydro was able to involve the communities downstream of its dams and encourage their participation in emergency planning and coordination. B.C. Hydro's process for involving a community in its emergency exercises starts with an invitation to the emergency coordinator in each affected community to attend an exercise planning meeting. Communities have occasionally declined to participate, the most common reasons being insufficiently developed emergency plans, budget prohibiting the cost of the exercise, or for political reasons. 2 refs., 1 tab

  9. Battle looms over hydroelectric dam relicensing

    International Nuclear Information System (INIS)

    Simpson, J.

    1993-01-01

    Environmental groups, buoyed by support from influential lawmakers, are vowing to change the Federal Energy Regulatory Commission's (FERC's) hydroelectric relicensing procedures. For too long, the groups say, the hydroelectric industry has benefitted from a cozy relationship with the FERC, which has emphasized economic over environmental considerations. The success or failure of the environmentalists agenda will likely prove critical to the hydroelectric industry. With 237 hydroelectric licenses up for renewal this year - the most ever considered by the FERC in one year - and four vacant seats at the Commission, FERC hydro policy appears poised for upheaval. The groups have proposed a multipoint program to address perceived shortcomings in the FERC's hydroelectric relicensing procedures. The program includes recommendations to: Shorten dam licenses (which currently stretch 30 to 50 years) and require the FERC to periodically reevaluate the terms of hydropower licenses; Increase Congressional oversight of the FERC to assure adherence to environmental laws, including the National Environmental Policy Act, which mandates the preparation of environmental impact statements where appropriate; Mandate facilities for upstream and downstream fish passage; Establish a mitigation fund, collectable from dam owners, for river conservation and restoration programs; Promote all alternatives to relicensing projects, including denial of project licenses; and Reassign the FERC's hydropower jurisdiction to another federal agency, such as the Environmental Protection Agency or the Department of the Interior

  10. 77 FR 22801 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2012-04-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group...). SUMMARY: The Glen Canyon Dam Adaptive Management Work Group (AMWG) makes recommendations to the Secretary..., the AMWG, a technical work group, a Grand Canyon Monitoring and Research Center, and independent...

  11. 75 FR 34476 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2010-06-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group... Management Work Group. The purpose of the Adaptive Management Work Group is to advise and to provide... of the Glen Canyon Dam Adaptive Management Work Group is in the public interest in connection with...

  12. Characterisation of gold tailings dams of the Witwatersrand Basin ...

    African Journals Online (AJOL)

    2006-10-04

    Oct 4, 2006 ... bentonite layer between the 9th and 10th meter level to minimise vertical air flow from the bottom of the tailings dams. ... m depth with bentonite. Due to the age of the dams, and the fact that they ...... from Cyanide-Rich Gold Mine. Tailings. Unpublished M.Sc. Thesis, The University of New Bruns- wick, USA.

  13. Seismic Analysis of Concrete Dam by Using Finite Element Method

    Directory of Open Access Journals (Sweden)

    Rozaina Ismail

    2017-01-01

    Full Text Available This paper reports a brief study on linear seismic analysis of Sg. Kinta Concrete Dam. The analysis was conducted in order to determine the performance and behaviour of the dam under seismic excitation. The dam was modelled as two-dimensional and developed based on the design drawing that is obtained from Angkasa Consulting Services Sdn. Bhd. The seismic analysis of the dam is conducted using finite element analysis software package LUSAS 14.3 and the dam has been analyse as a plain stress problem with a linear consideration. A set of historic data, with E1 Centro earthquake acceleration of about 0.50g is used as an earthquake excitation. The natural frequency and mode shape up to fifth mode of the dam has been obtained from the analysis to show the differences of the stress and deformation between each mode. The maximum horizontal and vertical stress of Sg. Kinta dam was found and the distribution of them was discussed in form of contours. The deformation of the dam were also been discussed by comparing the maximum displacement for each mode shaped.

  14. Revisiting the homogenization of dammed rivers in the southeastern US

    Science.gov (United States)

    Ryan A. McManamay; Donald J. Orth; Charles A. Dolloff

    2012-01-01

    For some time, ecologists have attempted to make generalizations concerning how disturbances influence natural ecosystems, especially river systems. The existing literature suggests that dams homogenize the hydrologic variability of rivers. However, this might insinuate that dams affect river systems similarly despite a large gradient in natural hydrologic character....

  15. Grouting design for slope stability of kedung uling earthfill dam

    Directory of Open Access Journals (Sweden)

    Najib

    2018-01-01

    Full Text Available Kedung Uling earthfill dam locates at Wonogiri Regency, Central Java, Indonesia. The dam encountered sliding and settlement at the embankment wall. To minimize sliding and settlement and to optimize the dam, both field investigation and laboratory tests have been proceeded for slope stability analysis and remedial embankment wall. Soil and rock investigation around the dam, which is followed by 10 core drillings, have been conducted. Laboratory tests such as direct shear and index properties have also been carried on. The results were further used for dam slope stability model using slide 6.0 and were used to analyzed factor of safety (FS of Kedunguling dam. 10 conditions of dam were simulated and strengthening body of dam with grouting was designed. The results showed two conditions, which are condition of maximum water level with and without earthquake at downstream, were unsatisfy Indonesia National Standard (SNI for building and infrastructure. These conditions can be managed by using grouting for increasing stabilization of embankment wall. By setting up grouting, factor of safety increases and meet the SNI standard requirement.

  16. Walden North Dam overtopping : emergency response and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, S. [FortisBC Inc., South Slocan, BC (Canada); McCreanor, J. [Acres International Ltd., Calgary, AB (Canada); Cronin, D.L.R.; Daw, D. [Acres International Ltd., Vancouver, BC (Canada)

    2004-09-01

    This paper described the events that led to the overtopping of the Walden North Dam during a heavy rainfall in June 2002, resulting in a breach around an abutment wall. The dam is part of a run-of-river hydro development on Cayoosh Creek near Lillooet, British Columbia. The Walden North Dam was a low, 46 meter wide concrete dam with a single radial gate. The dam overtopping was attributed to failure of the radial gate hoist. Prior to this event, the dam had been classified by the British Columbia Dam Safety Authorities as a high and then a low consequence category of failure. As facility managers, Aquila Networks Canada Ltd. established an immediate action plan to stabilize the situation and resume normal power production by applying the following priorities: (1) ensure safety of workers and the public, (2) limit further damage to the dam and other facilities, (3) ensure environmental protection, and (4) continue to operate the generation units. Local authorities were informed to evacuate a downstream campsite and environmental agencies were contacted along with safety regulators. Repairs included demolition of the damaged portion of the structure and construction a new two-bay gate/stoplog spillway and bridge. Construction was completed by September 2003 according to the requirements of the Department of Fisheries and Oceans for minimum flow, accurate control of fish flows and environmental monitoring of the stream area. 10 figs.

  17. 33 CFR 117.705 - Beaver Dam Creek.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Beaver Dam Creek. 117.705 Section 117.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New Jersey § 117.705 Beaver Dam Creek. The draw of the...

  18. Dam break flood wave under different reservoir's capacities and ...

    Indian Academy of Sciences (India)

    Farhad Hooshyaripor

    2017-07-14

    Jul 14, 2017 ... Dam failure has been the subject of many hydraulic engineering studies due to its ... the role of the side slopes on dam break flood wave, such that lower side slope ... improve the inputs and advance our knowledge about the.

  19. Measures of struggle against appearance of cracks in earth dams

    Directory of Open Access Journals (Sweden)

    Ibraeva Yulia

    2016-01-01

    Full Text Available The article describes a method calculation of the basic parameters of the transverse rows of pile of simple printed or precast dam. As well, in this article have been shown all the necessary formulas for this calculation and have been proposed solutions to prevent cracking in the dams.

  20. Evaluation of flora diversity and abundance in Awba Dam Tourism ...

    African Journals Online (AJOL)

    The study evaluated flora diversity and abundance in Awba Dam Tourism Centre, Ibadan, Nigeria. Complete enumeration of trees (>10cm diameter at breast height (dbh)), saplings, and small trees growing within 50m radius of the Awba dam was carried out. The percentage canopy cover of tree species (to the nearest 5%) ...

  1. Vaccination recommended for pregnant women

    OpenAIRE

    Skolarczyk, Justyna; Łabądź, Dawid; Pekar, Joanna; Nieradko-Iwanicka, Barbara

    2017-01-01

    Skolarczyk Justyna, Łabądź Dawid, Pekar Joanna, Nieradko-Iwanicka Barbara. Vaccination recommended for pregnant women. Journal of Education, Health and Sport. 2017;7(4):682-688. eISSN 2391-8306. DOI http://dx.doi.org/10.5281/zenodo.569050 http://ojs.ukw.edu.pl/index.php/johs/article/view/4423 The journal has had 7 points in Ministry of Science and Higher Education parametric evaluation. Part B item 1223 (26.01.2017). 1223 Journal of Education, Health and Sport eI...

  2. Prevalence of human papilloma virus infection in pregnant Turkish women compared with non-pregnant women.

    Science.gov (United States)

    Aydin, Y; Atis, A; Tutuman, T; Goker, N

    2010-01-01

    We aimed to find a prevalence of human papilloma virus (HPV) in order to define the 100 genotypes and subset of 14 oncogenic genotypes in pregnant Turkish women and to compare these with non-pregnant women. Cervical thin-prep specimens were obtained from 164 women in the first trimester pregnancy and 153 non pregnant women. 29.2% of pregnant versus 19.6% of non-pregnant Turkish women had at least one of the 100 types of HPV infection--a statistically significant difference. The rate of 14 high-risk HPV genotype infections was significantly higher in pregnant (14.6) compared to non-pregnant Turkish women (9.6%). Pregnant Turkish women are at higher risk for all HPV infections including high-risk cervical cancer genotypes.

  3. Sex hormone studies by radioimmunoassay in pregnant and non-pregnant women and in women treated with hormonal contraceptives

    International Nuclear Information System (INIS)

    Tafurt, C.A.

    1980-12-01

    Blood concentration profiles for follicle-stimulating hormone, luteinizing hormone, chorionic gonadotropin, testosterone, estradiol, estriol, progesterone, cortisol and sex hormonebinding globulin throughout a menstrual cycle were derived from measurements by radioimmunoassay and related procedures on serial blood samples from 16 normal women as controls. Similar studies were then performed on 9 normal women receiving a low-dose oral contraceptive combination of D-norgestrel and ethynlestradiol. Further studies were performed on 9 out of 16 normal women in whom progestational contraception was carried out with orally administered lynestrenol or intramuscularly administered norethindrone enathate and on 12 normal pregnant women from the 28th to the 38th week of pregnancy. Additional studies embracing chorionic gonadotropin progesterone and 17-hydroxyprogesterone were performed on 10 normal pregnant women from the 6th to the 12th week of pregnancy. Detailed results are presented and their significance discussed

  4. A progressive methodology for seismic safety evaluation of gravity dams

    International Nuclear Information System (INIS)

    Ghrib, F.; Leger, P.; Tinawi, R.; Lupien, R.; Veilleux, M.

    1995-01-01

    A progressive methodology for the seismic safety evaluation of existing concrete gravity dams was described. The methodology was based on five structural analysis levels with increasing complexity to represent inertia forces, dam-foundation and dam-interaction mechanisms, as well as concrete cracking. The five levels were (1) preliminary screening, (2) pseudo-static method, (3) pseudo-dynamic method, (4) linear time history analysis, and (5) non-linear history analysis. The first four levels of analysis were applied for the seismic safety evaluation of Paugan gravity dam (Quebec). Results showed that internal forces from pseudo-dynamic, response spectra and transient finite element analyses could be used to interpret the dynamic stability of dams from familiar strength-based criteria. However, as soon as the base was cracked, the seismically induced forces were modified, and level IV analyses proved more suitable to handle rationally these complexities. 8 refs., 7 figs., 1 tab

  5. Sinkhole investigated at B.C. Hydro's Bennett Dam

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro's W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig

  6. Seepage problem in Papan dam and the treatment

    Energy Technology Data Exchange (ETDEWEB)

    Sharghi, A. [JTMA Co., Tehran (Iran, Islamic Republic of); Palassi, M. [Tehran Univ. (Iran, Islamic Republic of). Dept. of Civil Engineering

    2003-07-01

    The Papan dam in the Krygyz Republic is 97 metres high. It is located in the Osh Oblast, within a narrow and steep sided gorge on the Ak-Bura River, approximately 20 kilometres south of the City of Osh. The impoundment of the dam revealed large inflows of water to the downstream dam through the upper half of the dam and through the joints in the right abutment. A number of options were considered before a treatment method was selected. The causes of the leakage were poor grouting, and joints and fissures in the abutment. The remedial process involved the use of a plastic concrete cutoff wall extended from the crest of the dam to a depth of approximately 70 metres, in addition to the use of a grouting curtain in the right abutment. 2 figs.

  7. Determining The Water Quality of Maruf Dam (Boyabat–Sinop

    Directory of Open Access Journals (Sweden)

    Ekrem MUTLU

    2017-06-01

    Full Text Available In this study, the preliminary findings obtained from 3 sampling points, which represent the whole, on Maruf Irrigation Dam, which is located in Boyabat district of Sinop province, for 12 months between September 2015 and August 2016 were examined. The parameters monitored are temperature, dissolved oxygen, pH, electrical conductivity, total hardness, total alkalinity, chemical oxygen demand, biological oxygen demand, and dissolved anions and cations (sodium, potassium, calcium, magnesium, ammonium, nitrate, phosphate, chloride, sulfate, and sulfite. Because of its low dissolved ionic matter content, Maruf Dam was characterized as an alkali dam with mid-hard water and low electrical conductivity. In terms of parameters A and B of Surface Water Quality Management Regulation, the dam is considered “high-quality” and “unpolluted”. Besides the irrigation purposes, for which the barrage was constructed, the dam can also be used for aquaculture, animal breeding, and farming needs.

  8. Some aspects in the legal regulation of the dams

    International Nuclear Information System (INIS)

    Tancev, Ljubomir

    1996-01-01

    In order to ensure high quality and low cost design and building of dams and appurtenant structures, as well as safe exploitation, it is obvious to have appropriate legislation. Keeping in mind that the dams are unique structures, for the design stage the legislation should be less strong. For the next phases - building, maintenance and exploitation - detail and rigorous legislation is recommended. It is emphasised that the engineers should have more freedom designing the dams, but they should be obvious to apply the most recent achievement in the field of the dam design and construction. For illustration, some aspects of three important questions are discussed - 1) the choice of maximum flood discharge, 2) the application of new materials and construction methods and 3) the application of modern methods for static and dynamic analysis of dams. (Author)

  9. Alteration of stream temperature by natural and artificial beaver dams.

    Science.gov (United States)

    Weber, Nicholas; Bouwes, Nicolaas; Pollock, Michael M; Volk, Carol; Wheaton, Joseph M; Wathen, Gus; Wirtz, Jacob; Jordan, Chris E

    2017-01-01

    Beaver are an integral component of hydrologic, geomorphic, and biotic processes within North American stream systems, and their propensity to build dams alters stream and riparian structure and function to the benefit of many aquatic and terrestrial species. Recognizing this, beaver relocation efforts and/or application of structures designed to mimic the function of beaver dams are increasingly being utilized as effective and cost-efficient stream and riparian restoration approaches. Despite these verities, the notion that beaver dams negatively impact stream habitat remains common, specifically the assumption that beaver dams increase stream temperatures during summer to the detriment of sensitive biota such as salmonids. In this study, we tracked beaver dam distributions and monitored water temperature throughout 34 km of stream for an eight-year period between 2007 and 2014. During this time the number of natural beaver dams within the study area increased by an order of magnitude, and an additional 4 km of stream were subject to a restoration manipulation that included installing a high-density of Beaver Dam Analog (BDA) structures designed to mimic the function of natural beaver dams. Our observations reveal several mechanisms by which beaver dam development may influence stream temperature regimes; including longitudinal buffering of diel summer temperature extrema at the reach scale due to increased surface water storage, and creation of cool-water channel scale temperature refugia through enhanced groundwater-surface water connectivity. Our results suggest that creation of natural and/or artificial beaver dams could be used to mitigate the impact of human induced thermal degradation that may threaten sensitive species.

  10. The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria

    Science.gov (United States)

    Ayeni, Amidu; Ojifo, Lawrence

    2018-06-01

    Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.

  11. Adiponectin supplementation in pregnant mice prevents the adverse effects of maternal obesity on placental function and fetal growth.

    Science.gov (United States)

    Aye, Irving L M H; Rosario, Fredrick J; Powell, Theresa L; Jansson, Thomas

    2015-10-13

    Mothers with obesity or gestational diabetes mellitus have low circulating levels of adiponectin (ADN) and frequently deliver large babies with increased fat mass, who are susceptible to perinatal complications and to development of metabolic syndrome later in life. It is currently unknown if the inverse correlation between maternal ADN and fetal growth reflects a cause-and-effect relationship. We tested the hypothesis that ADN supplementation in obese pregnant dams improves maternal insulin sensitivity, restores normal placental insulin/mechanistic target of rapamycin complex 1 (mTORC1) signaling and nutrient transport, and prevents fetal overgrowth. Compared with dams on a control diet, female C57BL/6J mice fed an obesogenic diet before mating and throughout gestation had increased fasting serum leptin, insulin, and C-peptide, and reduced high-molecular-weight ADN at embryonic day (E) 18.5. Placental insulin and mTORC1 signaling was activated, peroxisome proliferator-activated receptor-α (PPARα) phosphorylation was reduced, placental transport of glucose and amino acids in vivo was increased, and fetal weights were 29% higher in obese dams. Maternal ADN infusion in obese dams from E14.5 to E18.5 normalized maternal insulin sensitivity, placental insulin/mTORC1 and PPARα signaling, nutrient transport, and fetal growth without affecting maternal fat mass. Using a mouse model with striking similarities to obese pregnant women, we demonstrate that ADN functions as an endocrine link between maternal adipose tissue and fetal growth by regulating placental function. Importantly, maternal ADN supplementation reversed the adverse effects of maternal obesity on placental function and fetal growth. Improving maternal ADN levels may serve as an effective intervention strategy to prevent fetal overgrowth caused by maternal obesity.

  12. [Pregnant diabetic patients: institutional experience].

    Science.gov (United States)

    Gutiérrez Gutiérrez, Héctor Israel; Carrillo Iñiguez, Mayra Judith; Pestaña Mendoza, Silvia; Santamaría Ferreira, Mauricio

    2006-04-01

    Diabetes mellitus complicates 3-5% of all pregnancies and is a major cause of perinatal morbidity and mortality. The diet and insulin have revolutionized the care related with pregnancy complicated by diabetes mellitus. To report the management experience in patients with diabetes and pregnancy at the Instituto Materno Infantil, Estado de Mexico. A descriptive, retrospective, observational and cross-sectional study of pregnant women with diabetes and pregnancy was conducted from 2003 to 2004. We included 55 pregnant women who had: gestational diabetes 30 (54.4%), pregestational diabetes 24 (43.6%), and carbohydrate intolerance 1 (1.8%); every one of them were controlled either with diet, insulin or both. The mean age was 30.6, 80% with family history of type 2 diabetes mellitus, 9% gestational diabetes. Gestational diabetes was diagnosed in 33.3% by abnormal 50 g glucose screening and 46.6% with oral glucose tolerance test (OGTT). The main complications among the patients were urinary disease (61.3%) and the major fetal malformation were those related with cardiovascular disease (9.09%). The most frequent mode of delivery was cesarean section (58%) and birth weight was of 3,146 g. The main risk factors identified among women in the study group were as follow: More than 25 years of age and family history of diabetes mellitus. We observed a progressive increase in the insulin dosage. The most consistent complications among the patients were urinary infection and the major fetal malformation was cardiovascular disease.

  13. Exposure to the widely used fungicide Mancozeb causes thyroid hormone disruption in rat dams but no behavioral effects in the offspring

    DEFF Research Database (Denmark)

    Petersen, Marta Axelstad; Boberg, Julie; Nellemann, Christine Lydia

    2011-01-01

    The widely used fungicide Mancozeb has been shown to cause hypothyroxinemia and other adverse effects on the thyroid hormone system in adult experimental animals. In humans, hypothyroxinemia early in pregnancy is associated with adverse effects on the developing nervous system and can lead...... to impaired cognitive function and motor development in children. The aim of the present study was therefore to assess whether perinatal Mancozeb exposure would cause developmental neurotoxicity in rats. Groups of 9-21 time-mated Wistar rats were dosed with 0, 50, 100 or 150 mg Mancozeb/kg bw/day by gavage...... offspring. The dose of 150 mg/kg/day caused neurotoxicity in the pregnant dams, and was therefore reduced to 100 mg/kg bw/day in mid study. T4 levels showed a dose-dependent and significant decreased in dams from all three dose groups on GD 15, whereas offspring T4 levels, thyroid weights and histology were...

  14. Rabies Vaccine Hesitancy and Deaths Among Pregnant and Breastfeeding Women - Vietnam, 2015-2016.

    Science.gov (United States)

    Nguyen, Huong T T; Tran, Cuc H; Dang, Anh D; Tran, Huong G T; Vu, Thiem D; Pham, Thach N; Nguyen, Hoang V; Nguyen, Anh N K; Pieracci, Emily G; Tran, Duong N

    2018-03-02

    Human rabies deaths are preventable through prompt administration of postexposure prophylaxis (PEP) with rabies immune globulin and rabies vaccine after exposure to a rabid animal (1); there are no known contraindications to receiving PEP (1,2). Despite widespread availability of PEP in Vietnam, in 2015 the Ministry of Health (MoH) received reports of pregnant and breastfeeding women with clinically diagnosed rabies. MoH investigated factors associated with these rabies cases. MoH found that, during 2015-2016, among 169 cases reported in Vietnam, two probable cases of rabies were reported in breastfeeding mothers and four in pregnant women, all of whom had been bitten by dogs. All six patients died. Three of the four pregnant women had cesarean deliveries. One of the three newborns died from complications believed to be unrelated to rabies; the fourth pregnant woman contracted rabies too early in pregnancy for the fetus to be viable. Two of the patients sought care from a medical provider or traditional healer; however, none sought PEP after being bitten. In each case, families reported the patient's fear of risk to the fetus or breastfed child as the primary barrier to receiving PEP. These findings highlight the need for public health messaging about the safety and effectiveness of PEP in preventing rabies among all persons with exposures, including pregnant and breastfeeding women.

  15. Delphi Accounts Receivable Module -

    Data.gov (United States)

    Department of Transportation — Delphi accounts receivable module contains the following data elements, but are not limited to customer information, cash receipts, line of accounting details, bill...

  16. Behavior and dam passage of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March 2011 - February 2012

    Science.gov (United States)

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.

    2013-01-01

    The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at

  17. The Political Ecology of Chinese Large Dams in Cambodia: Implications, Challenges and Lessons Learnt from the Kamchay Dam

    Directory of Open Access Journals (Sweden)

    Giuseppina Siciliano

    2016-09-01

    Full Text Available Given the opportunities offered by foreign investment in energy infrastructure mostly by Chinese firms, the Government of Cambodia is giving high priority to developing hydropower resources for reducing energy poverty and powering economic growth. Using a “Political ecology of the Asian drivers” framework, this paper assesses China’s involvement in the development of large dams’ in Cambodia and its impacts on the access of natural resources such as water and energy by dam builders, local communities and the government. This analysis is based on 61 interviews and 10 focus group discussions with affected communities, institutional actors, Chinese dam builders and financiers in relation to the first large Chinese dam built in Cambodia: the Kamchay dam. Based on the results of the analysis this paper makes recommendations on how to improve the planning, implementation and governance of future large dams in Cambodia.

  18. Fosfortab fra det dyrkede areal til Stevning Dam, Hindemaj og Haderslev Dam

    DEFF Research Database (Denmark)

    Andersen, Hans Estrup; Heckrath, Goswin; Thodsen, Hans

    Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P-indeks-kortlægni......Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P...

  19. Stability of earth dam with a vertical core

    Directory of Open Access Journals (Sweden)

    Orekhov Vyacheslav Valentinovich

    2016-01-01

    Full Text Available Earth dam with impervious element in the form of asphaltic concrete core is currently the most promising type of earth dams (due to simple construction technology and universal service properties of asphaltic concrete and is widely used in the world. However, experience in the construction and operation of high dams (above 160 m is not available, and their work is scarcely explored. In this regard, the paper discusses the results of computational prediction of the stress-strain state and stability of a high earth dam (256 m high with the core. The authors considered asphaltic concrete containing 7 % of bitumen as the material of the core. Gravel was considered as the material of resistant prisms. Design characteristics of the rolled asphaltic concrete and gravel were obtained from the processing of the results of triaxial tests. The calculations were performed using finite element method in elastoplastic formulation and basing on the phased construction of the dam and reservoir filling. The research shows, that the work of embankment dam with vertical core during filling of the reservoir is characterized by horizontal displacement of the lower resistant prism in the tailrace and the formation of a hard wedge prism descending along the core in the upper resistant prism. The key issue of the safety assessment is to determine the safety factor of the overall stability of the dam, for calculation of which the destruction of the earth dam is necessary, which can be done by reducing the strength properties of the dam materials. As a results of the calculations, the destruction of the dam occurs with a decrease in the strength characteristics of the materials of the dam by 2.5 times. The dam stability depends on the stability of the lower resistant prism. The destruction of its slope occurs on the classical circular-cylindrical surface. The presence of a potential collapse surface in the upper resistant prism (on the edges of the descending wedge does

  20. 3-D simulation of hanging wall effect at dam site

    Science.gov (United States)

    Zhang, L.; Xu, Y.

    2017-12-01

    Hanging wall effect is one of the near fault effects. This paper focuses on the difference of the ground motions on the hanging wall side between the footwall side of the fault at dam site considering the key factors, such as actual topography, the rupture process. For this purpose, 3-D ground motions are numerically simulated by the spectrum element method (SEM), which takes into account the physical mechanism of generation and propagation of seismic waves. With the SEM model of 548 million DOFs, excitation and propagation of seismic waves are simulated to compare the difference between the ground motion on the hanging wall side and that on the footwall side. Take Dagangshan region located in China as an example, several seismogenic finite faults with different dip angle are simulated to investigate the hanging wall effect. Furthermore, by comparing the ground motions of the receiving points, the influence of several factors on hanging wall effect is investigated, such as the dip of the fault and the fault type (strike slip fault or dip-slip fault). The peak acceleration on the hanging wall side is obviously larger than those on the footwall side, which numerically evidences the hanging wall effect. Besides, the simulation shows that only when the dip is less than 70° does the hanging wall effect deserve attention.

  1. Proximity to Delivery Alters Insulin Sensitivity and Glucose Metabolism in Pregnant Mice.

    Science.gov (United States)

    Musial, Barbara; Fernandez-Twinn, Denise S; Vaughan, Owen R; Ozanne, Susan E; Voshol, Peter; Sferruzzi-Perri, Amanda N; Fowden, Abigail L

    2016-04-01

    In late pregnancy, maternal insulin resistance occurs to support fetal growth, but little is known about insulin-glucose dynamics close to delivery. This study measured insulin sensitivity in mice in late pregnancy at day 16 (D16) and near term at D19. Nonpregnant (NP) and pregnant mice were assessed for metabolite and hormone concentrations, body composition by DEXA, tissue insulin signaling protein abundance by Western blotting, glucose tolerance and utilization, and insulin sensitivity using acute insulin administration and hyperinsulinemic-euglycemic clamps with [(3)H]glucose infusion. Whole-body insulin resistance occurred in D16 pregnant dams in association with basal hyperinsulinemia, insulin-resistant endogenous glucose production, and downregulation of several proteins in hepatic and skeletal muscle insulin signaling pathways relative to NP and D19 values. Insulin resistance was less pronounced at D19, with restoration of NP insulin concentrations, improved hepatic insulin sensitivity, and increased abundance of hepatic insulin signaling proteins. At D16, insulin resistance at whole-body, tissue, and molecular levels will favor fetal glucose acquisition, while improved D19 hepatic insulin sensitivity will conserve glucose for maternal use in anticipation of lactation. Tissue sensitivity to insulin, therefore, alters differentially with proximity to delivery in pregnant mice, with implications for human and other species. © 2016 by the American Diabetes Association. Readers may use this article as long as the work is properly cited, the use is educational and not for profit, and the work is not altered.

  2. Phase I Inspection Report. National Dam Safety Program. Round Valley South Dam, Hunterdon County, New Jersey.

    Science.gov (United States)

    1978-05-01

    defined by the Recommended Guidelines for Safety Inspection of Dams. .M • wwM •^^^nmifgnmmmm’m •PH J.I.I MPU C. Hazard Classification - The...Conservation and Economic Development, August 1958. 3) Contract RV-1, State of New Jersey Department of Conservation and Economic Development...FIGURE 4 iymmmmr STATE OF NEW JERSEY DEPARTMENT OF CONSERVATION AND ECONOMIC DEVFl OtVNKM OF WATNt FOUCY «MO mm 1 ROUND VALLEY RESERVOIR

  3. Dam safety investigations of the concrete structures of Hugh Keenleyside dam

    International Nuclear Information System (INIS)

    Hanna, A.W.; Nunn, J.O.H.; Cornish, L.; Northcott, P.

    1993-01-01

    The Hugh Keenleyside dam is located on the Columbia River in southeastern British Columbia, and impounds Arrow Lakes Reservoir which has a live storage of 8.8 km 3 and drains an area of 36,000 km 2 . It consists of a number of concrete structures, with a total length of 360 m and a maximum height of 58 m, and an earthfill embankment which spans across the original river channel. The 450 m long zoned earthfill dam is founded on pervious alluvium over 150 m deep. It has a sloping impervious core constructed from glacial till which extends 670 m upstream of the dam. This impervious blanket extends over the full width of the reservoir and is connected to the upstream face of the concrete structures. The results of a dam safety study, which was carried out due to the presence of high uplift pressures at some parts of the foundation, and stability concerns, are presented. The investigation concluded that the high uplift pressures were due to a localized defect in the upstream blanket and did not indicate any general deterioration of the blanket. Techniques that were found to be of particular use in the study for defining the source and nature of the foundation defects were: temperature surveys of flows from piezometers, cells and drains; air injection tests; and pressure response testing of cells, piezometers and drains to establish foundation interconnections. The concrete structures met the stability criteria for all load cases considered except for the navigation lock and the low level outlets. 3 refs., 6 figs

  4. Abnormal medical exposure in pregnant patients

    International Nuclear Information System (INIS)

    Cardenas Herrera, J.; Lopez Bejerano, G.; Lamadrid, A.I.; Garcia Lima, O.; Diaz Bernal, E.; Freixas, V.; Sanchez, R.

    2001-01-01

    The exhibition to the ionizing radiations of women, during the gestational period constitutes, with some frequency, the reason for preoccupation for the future mother and the medical professionals in charge to take care of them. The protection of the embryo-fetus against the ionizing radiations is from singular importance, given its special vulnerability to this physical agent, whereas on the other hand the processing or diagnosis with ionizing radiations is beneficial for the mother, only is it indirectly for the embryo-fetus, that exposes itself to a risk in exchange for anything. This work gathers the experience obtained in the dosimetric clinical evaluation of twenty one pregnant patients submitted to diverse procedures of radiation diagnosis or nuclear medicine during years 1999-2000. The main results obtained demonstrate that 25% of the patients were put under nuclear medicine procedures with aims therapeutic or diagnoses. The gestational age of the patients oscillated between 4 and 12 weeks. It can be conclude that in all the case the dose receive by the patient in all the body not surpass the 2 mSv, reason why to, conjugated with the gestational age, not exist evidence of risk for the embryo-fetus paradoxically in all cases his doctors have indicated to the patients to make the interruption of his pregnancy, what demonstrate the ignorance of some of the professional of the health on the biological effect of the ionizing radiation during the prenatal exhibition

  5. Immunisation Status Of Pregnant Women In Bihar

    Directory of Open Access Journals (Sweden)

    Yadav R. J

    1998-01-01

    Full Text Available Research Question: What is the coverage level of immunization and other maternal services by a modified technique developed by IRMS (ICMR Delhi in comparison to standard WHO technique. Objectives: To study the â€"Coverage level for immunization, antenatal care and IFA tablets â€"Relationship of caste and education with the coverage levels. â€"Place and persons conducting deliveries. Study design: Cross-sectional. Setting: Both in rural and urban areas of Bihar. Participants: 375 mothers having children up to one year of age selected by a stratified random sampling technique developed by IRMS Delhi. Study variables: Immunisation status, antenatal care, Use of IFA tabs, Education of the female, Education of husband, place and person conducting the delivery. Statistical analysis: Proportions. Results: Overall immunization coverage was 42% for pregnant females. Coverage was high (60% in urban areas compared to rural areas (40%. Coverage was low among females from SC/ST category, also when females and their husbands were illiterates. Similar trend was observed for antenatal care and IFA tabs. 90% deliveries took place at home and were mainly attended by village dais. Majority of mothers received immunization from some. Govt. agency lack of, awareness and lack of motivation were more commonly found as reasons for non-immunisation among SC/ST as compared to others. Lack of awareness was also found as a common reason for non-immunisation among illiterate females.

  6. Olympic Dam project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-10-01

    The Olympic Dam deposit, South Australia, is estimated to contain at least 2,000 million tonnes of mineralized material, with an average grade of about 1.6% copper, 0.6 Kg/t of uranium oxide and 0.6 g/t of gold. The objective of the project is to extract and process the ore for the production and sale of copper, uranium oxide and the associated gold and silver. Facilities required are an underground mine, an on-site processing plant, associated facilities including a tailings retention system, a town to accommodate up to 9,000 people and other infrastructure. Chapters in the draft E.I.S. contain information on the environment, land use, aboriginal environment, geology, tailings retention system, radiation assessment, project infrastructure, social effects and economic effects

  7. Neotectonics of the Vajont dam site

    Science.gov (United States)

    Mantovani, Franco; Vita-Finzi, Claudio

    2003-08-01

    The disastrous Vajont landslide (NE Italy) of 9 October 1963 is generally thought to have occurred on an existing failure surface. Reassessment of the morphological and structural evidence suggests that movement was on a normal fault plane which had juxtaposed Cretaceous limestone and highly fractured rock debris, thus rendering the dam site unusually susceptible to massive sliding. The proposed fault is consistent in strike with the regional lineament pattern. Although movement was triggered by the combined effects of heavy rainfall and changes in reservoir level, there is circumstantial evidence that seismicity played a contributory part in mobilising the slide by increasing pore pressure at the base of the slide as well as by any associated shaking.

  8. Taking a new approach to dam building

    International Nuclear Information System (INIS)

    Taylor, D.

    1999-01-01

    Problems, including corruption, dogging construction of the Three Gorges dam being built in China are discussed. The article questions whether large hydro projects can ever be completed on time and within budget. It was suggested that by operating a build-operate-transfer scheme there might be greater incentives to complete on time but the vice-president of Skanska Civil Engineering was sceptical due to the risk involved. Through the Three Gorges Project, the Chinese government has learned that the relocation of thousands of people is far from easy. From a technical aspect, there may be unexpected problems in building underground. Some problems which arose in major hydro projects in India, Turkey and Lesotho were recounted. The vice-president of Skanska offered three pieces of advice and they are listed. (UK)

  9. Hydrogen sulfide concentration in Beaver Dam Creek

    International Nuclear Information System (INIS)

    Kiser, D.L.

    1979-01-01

    Concentration-time profiles calculated with LODIPS for various hypothetical releases of hydrogen sulfide from the heavy water extraction facility predict lethal conditions for swamp fish from releases as small as 568 kg discharged over a period of 30 minutes or from releases of 1818 kg discharged over a period of 6 hours or less. The necessary volatilization and oxidation coefficients for LODIPS were derived from field measurements following planned releases of H 2 S. Upsets in the operation of the wastewater strippers in the Girdler-Sulfide (GS) heavy water extraction facility in D Area have released significant amounts of dissolved H 2 S to Beaver Dam Creek. Because H 2 S is toxic to fish in concentrations as low as 1 mg/liter, the downstream environmental impact of H 2 S releases from D Area was evaluated

  10. Taking a new approach to dam building

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.

    1999-03-01

    Problems, including corruption, dogging construction of the Three Gorges dam being built in China are discussed. The article questions whether large hydro projects can ever be completed on time and within budget. It was suggested that by operating a build-operate-transfer scheme there might be greater incentives to complete on time but the vice-president of Skanska Civil Engineering was sceptical due to the risk involved. Through the Three Gorges Project, the Chinese government has learned that the relocation of thousands of people is far from easy. From a technical aspect, there may be unexpected problems in building underground. Some problems which arose in major hydro projects in India, Turkey and Lesotho were recounted. The vice-president of Skanska offered three pieces of advice and they are listed. (UK)

  11. Dams release methane even in temperate zoned

    International Nuclear Information System (INIS)

    Lemarchand, F.

    2010-01-01

    The Wohlen lake (near Bern) is a retaining dam built 90 years ago that has undergone a campaign to measure the quantity of methane released. The campaign lasted 1 year and the result was unexpected: 0.15 g/m 2 *day which one of the highest release rates in temperate zones. This result is all the more stunning since water stays only 2 days in average in the reservoir and that the drowned area is not important. In fact the river Aar that feeds the lake is loaded with organic matter coming from humane activities: agriculture and 3 sewage plants. This organic matter decays in the lake releasing methane. (A.C.)

  12. Proceedings of the Canadian Dam Association's 2005 annual conference : 100 years of dam experience : balancing tradition and innovation. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-09-01

    This conference provided a forum to promote discussion on improving the management and safety of dams. It featured 8 technical sessions as well as workshops to discuss dam safety guidelines and guidelines for extreme flood analyses and their applications. It also featured workshops on instrumentation and performance monitoring of dams; tailing dam closures and reclamation; and, practical approaches to emergency preparedness for dam owners. The discussions provided details on large hydropower development projects, their innovations in environmental impact assessment, mitigation, and monitoring. The conference included a technical component led by experts on dams and tailings facilities. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and safety guidelines. All 24 presentations at this conference have been catalogued separately for inclusion in this database

  13. Evaluating temporal changes in hydraulic conductivities near karst-terrain dams: Dokan Dam (Kurdistan-Iraq)

    Science.gov (United States)

    Dafny, Elad; Tawfeeq, Kochar Jamal; Ghabraie, Kazem

    2015-10-01

    Dam sites provide an outstanding opportunity to explore dynamic changes in the groundwater flow regime because of the high hydraulic gradient rapidly induced in their surroundings. This paper investigates the temporal changes of the hydraulic conductivities of the rocks and engineered structures via a thorough analysis of hydrological data collected at the Dokam Dam, Iraq, and a numerical model that simulates the Darcian component of the seepage. Analysis of the data indicates increased seepage with time and suggests that the hydraulic conductivity of the rocks increased as the conductivity of the grout curtain decreased. Conductivity changes on the order of 10-8 m/s, in a 20-yr period were quantified using the numerical analysis. It is postulated that the changes in hydraulic properties in the vicinity of Dokan Dam are due to suspension of fine materials, interbedded in small fissures in the rocks, and re-settlement of these materials along the curtain. Consequently, the importance of the grout curtain to minimize the downstream seepage, not only as a result of the conductivity contrast with the rocks, but also as a barrier to suspended clay sediments, is demonstrated. The numerical analysis also helped us to estimate the proportion of the disconnected karstic conduit flow to the overall flow.

  14. Extracellular ATP induces albuminuria in pregnant rats

    NARCIS (Netherlands)

    Faas, M.M.; van der Schaaf, G.; Borghuis, T.; Jongman, R.M.; van Pampus, Maria; de Vos, P.; van Goor, Harry; Bakker, W.W.

    BACKGROUND: As circulating plasma ATP concentrations are increased in pre-eclampsia, we tested whether increased plasma ATP is able to induce albuminuria during pregnancy. METHODS: Pregnant (day 14) and non-pregnant rats were infused with ATP (3000 microg/kg bw) via a permanent jugular vein cannula.

  15. Factors influencing HIV seroprevalence rate among pregnant ...

    African Journals Online (AJOL)

    Human immune deficiency virus (HIV) seroprevalence among pregnant women in Calabar was studied. The aims were to establish HIV seroprevalence rate and to identify factors which influence this rate in our pregnant women. HIV seroprevalence rate of 2.7% among antenatal women in Calabar was recorded with a ...

  16. INFORMATION SEEKING BEHAVIOUR OF PREGNANT WOMEN IN ...

    African Journals Online (AJOL)

    The study's population encompassed of 1900 pregnant women in selected hospitals. Proportional ... Internet, friends/relatives, persons at the workplace or professional advisors. Despite the ... city is an important trade and educational centre. It also houses one of .... This study was restricted to pregnant women registered for ...

  17. Asymptomatic Bacteriuria among Pregnant Women Attending ...

    African Journals Online (AJOL)

    The apparent decline in immunity of pregnant women appears to promote the growth of both com-mensal and non-commensal microorganisms. The objective of the study was to determine the prevalence of asymptomatic bacteriuria in pregnant women visiting the University hospital, Ku-masi. This prospective ...

  18. Smoking behavior in pregnant Arab Americans.

    Science.gov (United States)

    Kulwicki, Anahid; Smiley, Karen; Devine, Susan

    2007-01-01

    To determine the smoking behavior in pregnant Arab American women who attended a Women, Infant and Children (WIC) program at a local county public health clinic and compare the incidence of smoking behaviors of pregnant Arab American women with pregnant women who were not Arab Americans. Data were extracted from a computer database that contained information from health history charts of pregnant Arab and non-Arab American women. The study sample was 830 women, 823 of whom were Arab American participants enrolled in the WIC program in Michigan. Approximately 6% of pregnant Arab Americans smoked during pregnancy. The prevalence of smoking behavior among pregnant Arab American women was similar to that of smoking behaviors of Hispanics and Asian Americans in the United States. Although smoking behavior is a serious problem among Arab American immigrants in general and in the Arab world in particular, cultural factors that support healthy behavior during pregnancy in the Arab culture seem to limit the use of tobacco in pregnant women. Nurses who care for Arab American pregnant women can use this information to better inform their care of these patients.

  19. Characterization of the geochemical processes present in the radionuclides and metals mobilization in the tailing dam at the Uranium Mining and Milling Facilities - Pocos de Caldas, MG, Brazil

    International Nuclear Information System (INIS)

    Pinto, Patricia Freitas

    1995-08-01

    In Brazil, the first step of nuclear fuel cycle - the mining and milling of the uranium ore - is developed at the Uranium Mining and Milling Facilities of Pocos de Caldas, Minas Gerais state. The wastes management is a very important aspect of the process. The understanding of the geochemical processes that occur in the tailings dam is a key question to define a plan of action concerning the decommissioning strategy of the facility. The objective of the present work was to give some issues to help in the adoption of the remedial actions concerning the decommissioning of the facility. It focused on the characterization of the most important geochemical processes regulating the mobilization of radionuclides and heavy metals in the tailings dam. Two cores from the tailings dam (uncovered area) were collected. Seepage and drainage waters were sampled, the same being true for the tailings dam lake. Groundwater form an aquifer bellow the tailings dam and superficial waters from a river that receives the effluents of the dam (Soberbo River) were also sampled. Data from the mining company were used to calculate the inventory of radionuclides and heavy metals deposited in the waste dam.The obtained results showed that pyrite oxidation is the key process in the mobilization of radionuclides and heavy metals from the wastes. Pyrite oxidation is a process regulated by oxygen diffusion and water. In the studied scenario it could be shown that the process was limited to a one meter deep layer in the uncovered part of the waste dam. Because of this, Fe, Al, Mn, Zn, Th and 238 U showed higher concentrations in the bottom layers of the cores in relation to the upper ones. 226 Ra and 210 Pb showed opposite patterns. The coprecipitation with Ca SO 4 was the most relevant mechanism in both radionuclides immobilization in the wastes. Sulfate was the only chemical species that could be assigned as a contaminant in aquifer bellow the waste dam. As a conclusion, the target environmental

  20. Responses of riparian reptile communities to damming and urbanization

    Science.gov (United States)

    Hunt, Stephanie D.; Guzy, Jacquelyn C.; Price, Steven J.; Halstead, Brian J.; Eskew, Evan A.; Dorcas, Michael E.

    2013-01-01

    Various anthropogenic pressures, including habitat loss, threaten reptile populations worldwide. Riparian zones are critical habitat for many reptile species, but these habitats are also frequently modified by anthropogenic activities. Our study investigated the effects of two riparian habitat modifications-damming and urbanization-on overall and species-specific reptile occupancy patterns. We used time-constrained search techniques to compile encounter histories for 28 reptile species at 21 different sites along the Broad and Pacolet Rivers of South Carolina. Using a hierarchical Bayesian analysis, we modeled reptile occupancy responses to a site's distance upstream from dam, distance downstream from dam, and percent urban land use. The mean occupancy response by the reptile community indicated that reptile occupancy and species richness were maximized when sites were farther upstream from dams. Species-specific occupancy estimates showed a similar trend of lower occupancy immediately upstream from dams. Although the mean occupancy response of the reptile community was positively related to distance downstream from dams, the occupancy response to distance downstream varied among species. Percent urban land use had little effect on the occupancy response of the reptile community or individual species. Our results indicate that the conditions of impoundments and subsequent degradation of the riparian zones upstream from dams may not provide suitable habitat for a number of reptile species.

  1. Incremental Dynamic Analysis of Koyna Dam under Repeated Ground Motions

    Science.gov (United States)

    Zainab Nik Azizan, Nik; Majid, Taksiah A.; Nazri, Fadzli Mohamed; Maity, Damodar; Abdullah, Junaidah

    2018-03-01

    This paper discovers the incremental dynamic analysis (IDA) of concrete gravity dam under single and repeated earthquake loadings to identify the limit state of the dam. Seven ground motions with horizontal and vertical direction as seismic input considered in the nonlinear dynamic analysis based on the real repeated earthquake in the worldwide. All the ground motions convert to respond spectrum and scaled according to the developed elastic respond spectrum in order to match the characteristic of the ground motion to the soil type. The scaled was depends on the fundamental period, T1 of the dam. The Koyna dam has been selected as a case study for the purpose of the analysis by assuming that no sliding and rigid foundation, has been estimated. IDA curves for Koyna dam developed for single and repeated ground motions and the performance level of the dam identifies. The IDA curve of repeated ground motion shown stiffer rather than single ground motion. The ultimate state displacement for a single event is 45.59mm and decreased to 39.33mm under repeated events which are decreased about 14%. This showed that the performance level of the dam based on seismic loadings depend on ground motion pattern.

  2. STABILITAS CHECK DAM DI ARBORETUM DESA SUMBER BRANTAS

    Directory of Open Access Journals (Sweden)

    Endang Purwati

    2012-09-01

    Full Text Available Abstract: The stability of check-dam in arboretum of Sumber Brantas village. Sumber Brantas water sources area is arboretum territory which has to be maintained as conservation either for technical or vegetation (plants cover by sustainable development. Arboretum territory is made as asylum in irrigation system district of Brantas River. This research discusses technical conservation activity to build the check dam in conserving the area. Check dam is built dimensionally by using HEC-RAS Program to get safe and stable dimension for rolling, shifting and piping of Sf > 1.5, and based on hydrologic analysis to get maximum flood discharge of 48.01 m3second-1. Hydraulic analysis is used to get water level profile and pressure for the dam body. Stability of the structure will be controlled by construction load (weight of check dam and its fully sediment storage condition. The result of this research shows that the safe and stable dimension for check dam are as follows: 28 meter of width; 3 meter of main height; 1.5 meter of sub-height; 10 meter of stilling basin length (Main Dam–Sub Dam.

  3. Estimates o the risks associated with dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Ayyaswamy, P.; Hauss, B.; Hseih, T.; Moscati, A.; Hicks, T.E.; Okrent, D.

    1974-03-01

    The probabilities and potential consequences of dam failure in California, primarily due to large earthquakes, was estimated, taking as examples eleven dams having a relatively large population downstream. Mortalities in the event of dam failure range from 11,000 to 260,000, while damage to property may be as high as $720 million. It was assumed that an intensity IX or X earthquake (on the Modified Mercalli Scale) would be sufficient to completely fail earthen dams. Predictions of dam failure were based on the recurrence times of such earthquakes. For the dams studied, the recurrence intervals for an intensity IX earthquake varied between 20 and 800 years; for an intensity X between 50 and 30,000 years. For the Lake Chabot and San Pablo dams (respectively 20, 30 years recurrent earthquake times for a intensity X) the associated consequences are: 34,000 (Lake Chabot) and 30,000 (San Pablo) people killed; damage $140 million and $77 million. Evaculation was found to ameliorate the consequences slightly in most cases because of the short time available. Calculations are based on demography, and assume 10 foot floodwaters will drown all in their path and destroy all one-unit homes in the flood area. Damage estimates reflect losses incurred by structural damage to buildings and do not include loss of income. Hence the economic impact is probably understated.

  4. Verifying Pressure of Water on Dams, a Case Study

    Directory of Open Access Journals (Sweden)

    Temel Bayrak

    2008-09-01

    Full Text Available Sensing and monitoring deformation pattern of dams is often one of the most effective ways to understand their safety status. The main objective of the present study is to find the extent to which rising reservoir level affects the mechanism of deformation of the Yamula dam under certain changes in the reservoir level conditions during the first filling period. A new dynamic deformation analysis technique was developed to analyze four geodetic monitoring records consisting of vertical and horizontal displacements of nine object points established on the dam and six reference points surrounding it, to see whether the rising reservoir level is responsible for the vertical and horizontal deformations during the first filling period. The largest displacements were determined in the middle points of the dam construction. There is an apparent linear relationship between the dam subsidence and the reservoir level. The dynamic deformation model was developed to model this situation. The model infers a causative relationship between the reservoir level and the dam deformations. The analysis of the results determines the degree of the correlation between the change in the reservoir level and the observed structural deformation of the dam.

  5. The Effects of Sugammadex on Progesterone Levels in Pregnant Rats

    Directory of Open Access Journals (Sweden)

    Tayfun Et

    2015-06-01

    Full Text Available Background: Sugammadex has been shown to decrease the efficiency of progesterone-containing oral contraceptive drugs which possess a steroid structure. Aims: The aim of the present study was to evaluate the effects of sugammadex on progesterone levels in pregnant rats as well as on the physiological course of the pregnancy. Study Design: Animal experiment. Methods: This study was approved by the Selçuk University Ethical Committee for Experimental Animal Research. Pregnant Winster Albino rats (n=26 were divided into three groups and administered with various intravenous injections on the 7th day of pregnancy. The control group (Group K, n=6 received 1.5 mL serum physiologic, the sugammadex group (Group S, n=10 received 30 mg/kg sugammadex and the sugammadex + rocuronium group (Group SR, n=10 received 30 mg/kg sugammadex and 3.5 mg/kg rocuronium. Progesterone levels were measured and the offspring were monitored for morphologic status. Results: Mean progesterone levels were 94.16±15.54 ng/mL in Group K, 87.86±12.48 ng/mL in Group S, and 94.53±16.10 ng/mL in Group SR (p>0.05. No stillbirth or miscarriage was observed in the rats. The mean number of offspring was 6.8±1.47 in Group K, 6.5±1.35 in Group S, and 6.4±1.17 in Group SR. The offspring appeared macroscopically normal. Conclusion: Sugammadex does not appear to affect the progesterone levels in pregnant rats in the first trimester and the clinical course. Successful completion of pregnancy and the absence of stillbirth or miscarriage will guide future studies about the use of sugammadex, particularly in the first trimester of the pregnancy.

  6. Pregnant at work: time for prenatal care providers to act.

    Science.gov (United States)

    Karkowsky, Chavi Eve; Morris, Liz

    2016-09-01

    Fifty years ago, when a woman became pregnant, she was expected to stop working. Today, however, most women who work are the primary, sole, or co-breadwinner for their families, and their earnings during pregnancy are often essential to their families' economic well-being. Medical data about working during pregnancy are sparse but generally show that both low-risk and high-risk women can tolerate work-related duties well, although some work accommodations (eg, providing a chair for sitting, allowing snacks, or modifying the work schedule) may be necessary. However, some employers refuse to accommodate pregnant women who need adjustments. This can result in a woman being forced to make the choice between working without accommodations and losing her income and health insurance or even her job. Prenatal care providers can play an important role by implementing changes in their own practice, shaping public policy, and conducting research to increase protections for pregnant women and to ensure that they receive medically recommended accommodations while continuing to earn income for their growing families. Copyright © 2016 Elsevier Inc. All rights reserved.

  7. Antagonistic effects of cadmium on lead accumulation in pregnant and non-pregnant mice

    International Nuclear Information System (INIS)

    Smith, Euan; Gancarz, Dorota; Rofe, Allan; Kempson, Ivan M.; Weber, John; Juhasz, Albert L.

    2012-01-01

    Highlights: ► We investigate the exposure of pregnant and non-pregnant mice to cadmium (Cd) on lead (Pb) contaminated soil. ► We examine the changes in lead accumulation in mice due to the presence of cadmium in soil. ► Lead accumulation is higher in pregnant compared to non-pregnant mice. ► Cadmium decreases lead accumulation in all mice irrespective of status. - Abstract: People are frequently exposed to combinations of contaminants but there is a paucity of data on the effects of mixed contaminants at low doses. This study investigated the influence of cadmium (Cd) on lead (Pb) accumulation in pregnant and non-pregnant mice following exposure to contaminated soil. Exposure to Pb from contaminated soils increased Pb accumulation in both pregnant and non-pregnant mice compared to unexposed control animals (pregnant and non-pregnant). Lead accumulation in the liver and kidneys of exposure pregnant mice (40 ± 15 mg Pb kg −1 ) was significantly higher (P −1 ). The presence of Cd in contaminated soil had a major effect on the Pb and Fe accumulation in the kidneys and liver, respectively. This study shows that Pb uptake is mediated by the presence of Cd in the co-contaminated soil and demonstrates that further research is required to investigate the influence of co-contaminants on human exposure at sub-chronic concentrations.

  8. Patterns of the utilization of prenatal diagnosis services among pregnant women, their satisfaction and its associated factors in Viet Nam.

    Science.gov (United States)

    Doan, Duong Thi Thuy; Nguyen, Huong Thi Thu; Bui, Ha Thi Thu

    2017-02-01

    This study aimed at understanding the patterns of the utilization of prenatal diagnostic (PND) services among pregnant women, their satisfaction and its associated factors at three regional prenatal diagnostic centres in Viet Nam. A cross-sectional design was used, with a consecutive sampling method to recruit pregnant women who used PND services at the three biggest regional PND services centres in Viet Nam between January and June, 2014. A total of 298 participants, about 100 participants per centre were interviewed and included in data analysis. Descriptive analyses and logistic regression methods were applied to identify association between satisfaction of women and their socio-economic characteristics. 80% of pregnant women received counselling on PND services, whilst 90% received ultrasonography services; 65.4% were satisfied with the PND services they used. Pregnant women, who were in a lower income group and received counselling but did not receive ultrasonography, were more likely to have higher satisfaction levels of PND services. A process to ensure that every pregnant woman receives sufficient PND counselling before and after receiving PND testing must be given careful and thorough consideration.

  9. Dam-break studies for mine tailings impoundments

    International Nuclear Information System (INIS)

    Jeyapalan, J.K.

    1982-01-01

    This paper describes simple procedures for performing dam-break analyses. Tailings from dam failures usually liquefy and flow for substantial distances as a viscous fluid. The prediction of the possible extent of flow slide movement is illustrated using two case histories. Topics considered include the flow behavior of liquefied talings, dimensionsless numbers for mine tailings and associated flow regimes, laminar flow, and turbulent flow. The potential inundation regions downstream of mine tailings dams are assessed. It is concluded that instances of flow slides of mine waste embankments indicate that the failure of these structures has considerable potential for damage to life and property in many cases

  10. Seismic rehabilitation and analysis of Chaohe earth dam

    Science.gov (United States)

    Fu, Lei; Zeng, Xiangwu

    2005-12-01

    Stability of earth dams during earthquakes has been a major concern for geotechnical engineers in seismic active regions. Liquefaction induced slope failure occurred at the upstream slope of a major earth dam in the suburb of Beijing, China, during the 1976 Tangshan Earthquake. The gravelly soil with loose initial condition liquefied under relatively small ground vibration. In recent years, a major seismic rehabilitation project was carried out on a similar earth dam nearby using dumped quarry stone. Seismic stability analysis was carried out using model test, finite element simulation, and pseudo-static slope stability program after taking into account the influence of excess pore pressure.

  11. Report on Auscultation of the Arenal's Dam P. H. Arenal

    International Nuclear Information System (INIS)

    1994-09-01

    The Costa Rican Electricity Institute (Instituto Costarricense de Electricidad), always has been worried to verify the good state of the works and thus to guarantee its operation. For that reason, it has established different sorts of auscultation to the Arenal's Dam. This report analyzes the geo-hydraulic, structural and topographic auscultation. It also includes information about the new techniques used by the ARCAL XVIII RLA/8/018; application of Tracer Techniques for the study of water leakage in dams and damming projects. (author). 18 charts, 2 maps, 4 tabs

  12. Investigation of seepage under the Wenxiakou dam using radiotracer

    International Nuclear Information System (INIS)

    Li Zhangsu

    1988-01-01

    This paper describes the result of seepage observation on the dam foundation of Wenxiakou Reservoir using radioactive NaI (I-131) as a tracer. The main feature of the observing technique is to ascertain the seepages between the dam foundation and the clay core wall and around the abutment by measuring vertical flow. The results obtained from the observation have provided some important information for planning the engineering project of anti-seepage and reinforcement of the dam foundation and its right abutment. (author). 2 refs, 4 figs, 1 tab

  13. Risk Perception Analysis Related To Existing Dams In Italy

    Science.gov (United States)

    Solimene, Pellegrino

    2013-04-01

    In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned

  14. Knowledge and choices of postpartum contraception among pregnant teens.

    Science.gov (United States)

    Ortiz-González, Karla M; Benabe, Erika; Rivera-Rosa, Edgardo; Negrón, Ivette; Romaguera, Josefina

    2014-09-01

    To describe the general knowledge and choices of postpartum contraception among pregnant teens who, at the time of the study, ranged in age from 13 to 19 years old and were receiving prenatal care at a hospital-based prenatal clinic. Questionnaires to obtain information regarding demographic characteristics and to explore contraception knowledge and choices were voluntarily completed by 44 pregnant teens, ranging in age from 13 to 19 years old. The frequency and distribution of the variables under study were analyzed and are presented herein. Forty-four teens participated in the study. They had a mean age of 17.5 years. A significant proportion of the participants, 20 (45.5%), claimed not to know where to find information about contraception. All the participants acknowledged knowing about the male condom; as to other methods of contraception, 41 (93.2%) knew about oral contraceptive pills (OCPs), 31 (70.5%) knew about the patch, 30 (68.2%) knew about Depo-Provera, and 25 (56.8%) knew about intrauterine devices (IUD). The contraception methods about which the participants reported having the least knowledge were the sponge, the diaphragm, implants, the vaginal ring, and various natural methods. The majority (90.0%) of the participants agreed that they would prefer to use postpartum contraception. The contraceptive method of choice for postpartum contraception was the IUD (40%), which was followed in terms of preference by OCPs (17.5%), the patch (12.5%), and Depo-Provera (12.5%). The majority of the pregnant teens who participated in the study professed the desire to use some sort of contraceptive method to ensure that they would not become pregnant again in the near future. To that end, most of them expressed a preference for the IUD, one of the most effective contraceptive methods available today. Nevertheless, they need more access to and information about available contraceptive methods.

  15. Matahina Dam : lessons learned from an earthquake-related internal erosion incident at the Matahina Dam, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Gillon, M. [Damwatch Services Ltd., Wellington (New Zealand)

    2009-07-01

    This case history discussed internal erosion damage and crest subsidence caused by an earthquake at the Matahina Dam in New Zealand. The study showed that cracking and internal erosion was initiated during the 1967 reservoir filling operation. Located in an area of active volcanism and faulting, the dam is located on a river with extensive erosion through an ignimbrite flow. The dam's core is founded on compact Tertiary age sediments overlain by sand and gravel deposits beneath the shoulders of the dam. The earthquake caused a rupture along an unidentified fault trace 12 km from the dam. The horizontal base acceleration recorded at the dam was 3.25 m/s. Transverse cracking was observed at each abutment, and deformations were observed in the rockfill. An investigation program was conducted to determine the dam's integrity. Piezometer measurements showed widespread fluctuations. It was concluded that the lack of an effective filter was a significant design omission. 12 refs., 12 figs.

  16. Linking Three Gorges Dam and downstream hydrological regimes along the Yangtze River, China

    NARCIS (Netherlands)

    Mei, X.; Dai, Z.; Van Gelder, P.H.A.J.M.; Gao, J.

    2015-01-01

    The magnitude of anthropogenic influence, especially dam regulation, on hydrological system is of scientific and practical value for large river management. As the largest dam in the world by far, Three Gorges Dam (TGD) is expected to be a strong evidence on dam impacts on downstream hydrological

  17. Management of agro-pastoral dams in Benin: stakeholders, institutions and rehabilitation research

    NARCIS (Netherlands)

    Kpéra, G.N.; Aarts, N.; Saïdou, A.; Tossou, R.C.; Eilers, C.H.A.M.; Mensah, G.A.; Sinsin, B.A.; Kossou, D.K.; van der Zijpp, A.J.

    2012-01-01

    Agro-pastoral dams are waterholes constructed to provide water for livestock and for agricultural development. In Benin, agro-pastoral dams are managed by dam management committees. This study seeks to (1) characterize the stakeholders involved in agro-pastoral dam use and management, (2) identify

  18. Knowledge about Iodine in Pregnant and Lactating Women in the Oslo Area, Norway.

    Science.gov (United States)

    Garnweidner-Holme, Lisa; Aakre, Inger; Lilleengen, Anne Marie; Brantsæter, Anne Lise; Henjum, Sigrun

    2017-05-13

    Lack of knowledge about iodine may be a risk factor for iodine deficiency in pregnant and lactating women. The aim of this study was to assess knowledge about iodine and predictors of iodine knowledge scores among pregnant and lactating women. The study also examined whether iodine knowledge scores were associated with iodine status. A cross-sectional study was performed on 804 pregnant women and 175 lactating women from 18 to 44 years of age in 2016 in the Oslo area, Norway. Knowledge about iodine was collected through a self-administered, paper-based questionnaire. Iodine concentrations in urine and breast milk were measured using an inductively coupled plasma mass spectrometer (ICPMS). 74% of the pregnant women and 55% of the lactating women achieved none to low iodine knowledge scores. Higher educated pregnant women and those who had received information about iodine had significantly higher knowledge scores. In lactating women, increased age was associated with higher knowledge scores. Knowledge scores were not associated with participants' iodine status. This study revealed a lack of knowledge about the importance of iodine in pregnant and lactating women, as well as about the most important dietary sources. Public education initiatives are required to increase the awareness about iodine in these population groups.

  19. Solar energy receiver

    Science.gov (United States)

    Schwartz, Jacob

    1978-01-01

    An improved long-life design for solar energy receivers provides for greatly reduced thermally induced stress and permits the utilization of less expensive heat exchanger materials while maintaining receiver efficiencies in excess of 85% without undue expenditure of energy to circulate the working fluid. In one embodiment, the flow index for the receiver is first set as close as practical to a value such that the Graetz number yields the optimal heat transfer coefficient per unit of pumping energy, in this case, 6. The convective index for the receiver is then set as closely as practical to two times the flow index so as to obtain optimal efficiency per unit mass of material.

  20. Cryogenic microwave channelized receiver

    International Nuclear Information System (INIS)

    Rauscher, C.; Pond, J.M.; Tait, G.B.

    1996-01-01

    The channelized receiver being presented demonstrates the use of high temperature superconductor technology in a microwave system setting where superconductor, microwave-monolithic-integrated-circuit, and hybrid-integrated-circuit components are united in one package and cooled to liquid-nitrogen temperatures. The receiver consists of a superconducting X-band four-channel demultiplexer with 100-MHz-wide channels, four commercial monolithically integrated mixers, and four custom-designed hybrid-circuit detectors containing heterostructure ramp diodes. The composite receiver unit has been integrated into the payload of the second-phase NRL high temperature superconductor space experiment (HTSSE-II). Prior to payload assembly, the response characteristics of the receiver were measured as functions of frequency, temperature, and drive levels. The article describes the circuitry, discusses the key issues related to design and implementation, and summarizes the experimental results

  1. Alexandrite Lidar Receiver

    National Research Council Canada - National Science Library

    Wilkerson, Thomas

    2000-01-01

    ...". The chosen vendor, Orca Photonics, In. (Redmond, WA), in close collaboration with USU personnel, built a portable, computerized lidar system that not only is suitable as a receiver for a near IR alexandrite laser, but also contains an independent Nd...

  2. Receiver Gain Modulation Circuit

    Science.gov (United States)

    Jones, Hollis; Racette, Paul; Walker, David; Gu, Dazhen

    2011-01-01

    A receiver gain modulation circuit (RGMC) was developed that modulates the power gain of the output of a radiometer receiver with a test signal. As the radiometer receiver switches between calibration noise references, the test signal is mixed with the calibrated noise and thus produces an ensemble set of measurements from which ensemble statistical analysis can be used to extract statistical information about the test signal. The RGMC is an enabling technology of the ensemble detector. As a key component for achieving ensemble detection and analysis, the RGMC has broad aeronautical and space applications. The RGMC can be used to test and develop new calibration algorithms, for example, to detect gain anomalies, and/or correct for slow drifts that affect climate-quality measurements over an accelerated time scale. A generalized approach to analyzing radiometer system designs yields a mathematical treatment of noise reference measurements in calibration algorithms. By treating the measurements from the different noise references as ensemble samples of the receiver state, i.e. receiver gain, a quantitative description of the non-stationary properties of the underlying receiver fluctuations can be derived. Excellent agreement has been obtained between model calculations and radiometric measurements. The mathematical formulation is equivalent to modulating the gain of a stable receiver with an externally generated signal and is the basis for ensemble detection and analysis (EDA). The concept of generating ensemble data sets using an ensemble detector is similar to the ensemble data sets generated as part of ensemble empirical mode decomposition (EEMD) with exception of a key distinguishing factor. EEMD adds noise to the signal under study whereas EDA mixes the signal with calibrated noise. It is mixing with calibrated noise that permits the measurement of temporal-functional variability of uncertainty in the underlying process. The RGMC permits the evaluation of EDA by

  3. Evaluation of a Brief Intervention Designed to Increase CPR Training among Pregnant Pool Owners

    Science.gov (United States)

    Girasek, Deborah C.

    2011-01-01

    This study evaluated whether a brief videotape could motivate pregnant pool owners to be trained in infant/child cardiopulmonary resuscitation (CPR). Women were recruited from prenatal classes in South Florida. Eligible volunteers were randomized to view a video or receive standard treatment, after completing a questionnaire. The video explained…

  4. The relevance of Vdrl as routine test in pregnant women: a critical ...

    African Journals Online (AJOL)

    Aim: To critically determine the relevance of Venereal Diseases Research Laboratories (VDRL) investigation as a routine serological screening for syphilis among pregnant women who receive antenatal care at the University of Nigeria Teaching Hospital (UNTH). Methods: A retrospective chart review of result of serological ...

  5. Mapping the social impacts of small dams: The case of Thailand's Ing River basin.

    Science.gov (United States)

    Fung, Zali; Pomun, Teerapong; Charles, Katrina J; Kirchherr, Julian

    2018-05-24

    The social impacts of large dams have been studied extensively. However, small dams' social impacts have been largely neglected by the academic community. Our paper addresses this gap. We examine the social impacts of multiple small dams in one upstream and one downstream village in Thailand's Ing River basin. Our research is based on semi-structured interviews with beneficiaries, government and NGOs. We argue that small dams' social impacts are multi-faceted and unequal. The dams were perceived to reduce fish abundance and provide flood mitigation benefits. Furthermore, the dams enabled increased access to irrigation water for upstream farmers, who re-appropriated water via the dams at the expense of those downstream. The small dams thus engendered water allocation conflicts. Many scholars, practitioners and environmentalists argue that small dams are a benign alternative to large dams. However, the results of our research mandate caution regarding this claim.

  6. ANEMIA PREVALANCE AND RELATED FACTORS IN PREGNANT WOMEN ADMITTED TO STATE HOSPITAL

    Directory of Open Access Journals (Sweden)

    Riza Citil

    2014-06-01

    Full Text Available Aim: This study was performed to determine the prevalance of anemia and related nutrition and other risk factors in pregnant women who admitted to the hospital for prenatal care. Material and Methods: This descriptive and cross-sectional study to receive prenatal care to the hospital admitted 311 women participated. The data on socio-demographic characteristics of pregnant women, pregnancy information and dietary habits using a questionnaire that was collected using face to face interviews. To determine anemia in pregnant women in the hospital laboratory records made during routine pregnancy examination hemoglobin (Hb values were used. Hb values of 0.05. Similarly, pregnancy, abortion and curettage with the numbers there is no significant difference between the prevalance of anemia (p> 0.05. Using iron-multivitamin preparations in pregnant women (32.9% than those using (20.4% were seen significantly more anemia, and anemia among pregnants who drank dark tea was more prevalent than pregnants who drank light tea and the difference was significant (33,9% vs 17,2% (p<0,05. Conclusion: As a conclusion, admitted to the hospital for routine prenatal care, anemia seen in one of every four pregnant women, and not taking iron-multivitamin preparations regularly and consumption of dark tea seemed to be related with gestational anemia. Thus, anemia should be diagnosed earlier in pregnant and iron and vitamin supplements must be started; and women must be informed about the risk factors of anemia by the health stuff. [J Contemp Med 2014; 4(2.000: 76-83

  7. BREASTFEEDING: THE MEANING FOR PREGNANT POSITIVE HIV

    Directory of Open Access Journals (Sweden)

    Dayane Cristina Silva Vinhas

    2006-12-01

    Full Text Available ABSTRACT: In The actions of prevention to the HIV AIDS, in the prenatal lens the advising of women infected by the HIV about the risk from the vertical transmission causing to prohibition from the lactation and from the breast-feeding crossed. Objective it identify joined the pregnants HIV positive the main worries as regards the impediment from the breast-feeding natural and evaluate the individual educational needs of activities as form alternative to the affectionate and psychic emotional support to the pregnant. Methodology treats itself of a boarding qualitative, they were interviewed pregnants soropositivas inscription in the outpatient clinic of prenatal of high risk, of a Public Hospital, in Goiânia GO. Analyzing the facts: them interviewed were unanimous in affirm that to pregnancy was not planned. It be pregnant and uncover that they are bearers of the virus HIV brought bigger expectations regarding the pregnancy: fear, insecurity, anguish and doubts are emotions by them related. And, they stood out that the specific groups permit bigger liberty for argument and change of experiences, the work helps to pregnant react to the consequences of the virus HIV. Like this being, we understand that the aid to the pregnant soroposotive, in the institution studied attends a standard quality, however, is important thing systematize the specific formation of groups of pregnant soropositives for HIV. KEY WORDS: Risk Prenatal; Nursing; HIV.

  8. Use of a Th1 Stimulator Adjuvant for Vaccination against Neospora caninum Infection in the Pregnant Mouse Model

    Directory of Open Access Journals (Sweden)

    Denis Grandgirard

    2013-03-01

    Full Text Available Vertical transmission from an infected cow to its fetus accounts for the vast majority of new Neospora caninum infections in cattle. A vaccine composed of a chimeric antigen named recNcMIC3-1-R, based on predicted immunogenic domains of the two microneme proteins NcMIC1 and NcMIC3, the rhoptry protein NcROP2, and emulsified in saponin adjuvants, significantly reduced the cerebral infection in non-pregnant BALB/c mice. Protection was associated with a mixed Th1/Th2-type cytokine response. However, the same vaccine formulation elicited a Th2-type immune response in pregnant mice and did not prevent vertical transmission or disease, neither in dams nor in offspring mice. In this study, an alternative vaccine formulation containing recNcMIC3-1-R emulsified in Freund’s incomplete adjuvant, a stimulator of the cellular immunity, was investigated. No protection against vertical transmission and cerebral infection in the pregnant mice and a very limited protective effect in the non-pregnant mice were observed. The vaccine induced a Th1-type immune response characterized by high IgG2a titres and strong IFN-γ expression, which appeared detrimental to pregnancy.

  9. Dams and river dolphins: Can they co-exist?

    International Nuclear Information System (INIS)

    Reeves, R.R.; Leatherwood, S.

    1994-01-01

    Dam construction is one of many ways that humans have modified river-dolphin habitats. It is suggested that physiographic and hydrologic complexity plays an important role in making rivers suitable for dolphins. If this hypothesis is true, then it can be assumed that dams and other artificial obstructions degrade dolphin habitat insofar as they reduce such complexity. This paper identifies some of the impacts that dams, barrages, and dikes might have on dolphins. Research is needed at project sites, both before and after construction, to document impacts. Specially designed ''swimways'' may allow upstream and downstream passage by dolphins and thus mitigate at least one of the adverse effects of dam projects, namely population fragmentation, but such measures aimed at benefiting single species are no substitute for protecting ecosystems. 30 refs

  10. 78 FR 47695 - Sam Rayburn Dam Power Rate

    Science.gov (United States)

    2013-08-06

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Sam Rayburn Dam Power Rate AGENCY: Southwestern Power Administration, DOE. ACTION: Notice of public review and comment. SUMMARY: The current Sam..., Southwestern Power Administration (Southwestern), has prepared Current and Revised 2013 Power Repayment Studies...

  11. Three Dimensional Seepage Analyses in Mollasadra Dam after Its ...

    African Journals Online (AJOL)

    Michael Horsfall

    constructed on Kor River. pore water pressure in the dam was investigated following its construction and first and second ... Some problems like seepage failure and slope stability are ... In addition, the effects of change in certain input ...

  12. FULCRUM - A dam safety management and alert system

    Energy Technology Data Exchange (ETDEWEB)

    Butt, Cameron; Greenaway, Graham [Knight Piesold Ltd., Vancouver, (Canada)

    2010-07-01

    Efficient management of instrumentation, monitoring and inspection data are the keys to safe performance and dam structure stability. This paper presented a data management system, FULCRUM, developed for dam safety management. FULCRUM is a secure web-based data management system which simplifies the process of data collection, processing and analysis of the information. The system was designed to organize and coordinate dam safety management requirements. Geotechnical instrumentation such as piezometers or inclinometers and operating data can be added to the database. Data from routine surveillance and engineering inspection can also be incorporated into the database. The system provides users with immediate access to historical and recent data. The integration of a GIS system allows for rapid assessment of the project site. Customisable alerting protocols can be set to identify and respond quickly to significant changes in operating conditions and potential impacts on dam safety.

  13. DESIGN OF SLIT DAMS FOR CONTROLLING STONY DEBRIS FLOWS

    Institute of Scientific and Technical Information of China (English)

    Hui-Pang LIEN

    2003-01-01

    A new method to a slit dam for controlling the stony debris flow has been derived based on the mass conservation law of the stony debris flow passing through a slit dam and the laboratory experiment results.This new method is then combined with three primary efficiency expressions: the dimensionless sediment outflow ratio,the sediment concentration ratio,and the sediment storage rate to develop a simple module,with which the height and the spacing of the posts,as well as the total spacing of slit dam are determined.Furthermore,these expressions can also be applied to check those slit dams that have already been constructed with their effectiveness against various magnitudes of the debris flow. The comparison between these expressions and laboratory data is in reasonable agreement.

  14. Assessment of anomalous seepage conditions in the Opa dam ...

    African Journals Online (AJOL)

    , dipole-dipole electrical horizontal profiling, spontaneous potential (SP) profiling and magnetic profiling, was carried out along the embankment of the Opa dam located within the campus of the Obafemi Awolowo University, Ile-Ife, Nigeria.

  15. Calculating earth dam seepage using HYDRUS software applications

    Directory of Open Access Journals (Sweden)

    Jakub Nieć

    2017-06-01

    Full Text Available This paper presents simulations of water seepage within and under the embankment dam of Lake Kowalskie reservoir. The aim of the study was to compare seepage calculation results obtained using analytical and numerical methods. In April 1985, after the first filling of the reservoir to normal storage levels, water leaks was observed at the base of the escarpment, on the air side of the dam. In order to control seepage flow, drainage was performed and additional piezometers installed. To explain the causes of increased pressure in the aquifer under the dam in May 1985 a simplified calculation of filtration was performed. Now, on the basis of archived data from the Department of Hydraulic and Sanitary Engineering using 3D HYDRUS STANDARD software, the conditions of seepage under the dam have been recreated and re-calculated. Piezometric pressure was investigated in three variants of drainage, including drainage before and after modernization.

  16. ElwhaChemical - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  17. Elwha Master Datafile - Elwha dam removal neashore monitoring

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Removal of two dams on the Elwha River, Washington will help restore natural sediment processes to the coastal environment near the river mouth. We are interested in...

  18. Lead isotopes as seepage indicators around a uranium tailings dam

    International Nuclear Information System (INIS)

    Gulson, B.L.; Mizon, K.J.; Korsch, M.J.; Noller, B.N.

    1989-01-01

    Lead isotope ratios and lead concentrations have been measured in water from 26 bores around the Ranger uranium tailings dam, Northern Territory, Australia, and from the dam itself to determine possible migration of lead derived from the radioactive decay of uranium. Lead isotope compositions have also been measured for the particulates retained on selected filters. The concentration of lead in the bore waters is extremely low (usually 206 Pb/ 204 Pb ratio measured in the bore waters differs by more than a factor of 100 from that in the tailings dam and shows no evidence of lead derived from a significant uranium accumulation. It may be possible to distinguish between lead from the tailings dam and that derived from a nearby uranium ore body

  19. Analytical Solution and Application for One-Dimensional Consolidation of Tailings Dam

    OpenAIRE

    Liu, Hai-ming; Nan, Gan; Guo, Wei; Yang, Chun-he; Zhang, Chao

    2018-01-01

    The pore water pressure of tailings dam has a very great influence on the stability of tailings dam. Based on the assumption of one-dimensional consolidation and small strain, the partial differential equation of pore water pressure is deduced. The obtained differential equation can be simplified based on the parameters which are constants. According to the characteristics of the tailings dam, the pore water pressure of the tailings dam can be divided into the slope dam segment, dry beach seg...

  20. Hydraulic fracturing of rock-fill dam

    Directory of Open Access Journals (Sweden)

    Jun-Jie WANG

    2016-02-01

    Full Text Available The condition in which hydraulic fracturing in core of earth-rock fill dam maybe induced, the mechanism by which the reason of hydraulic fracturing canbe explained, and the failure criterion by which the occurrence of hydraulicfracturing can be determined, were investigated. The condition dependson material properties such as, cracks in the core and low permeability ofcore soil, and “water wedging” action in cracks. An unsaturated core soiland fast impounding are the prerequisites for the formation of “waterwedging” action. The mechanism of hydraulic fracturing can be explainedby fracture mechanics. The crack propagation induced by water pressuremay follow any of mode I, mode II and mixed mode I-II. Based on testingresults of a core soil, a new criterion for hydraulic fracturing was suggested,from which mechanisms of hydraulic fracturing in the core of rock-fill damwere discussed. The results indicated that factors such as angle betweencrack surface and direction of principal stress, local stress state at thecrack, and fracture toughness KIC of core soil may largely affect theinduction of hydraulic fracturing and the mode of the propagation of thecrack.The condition in which hydraulic fracturing in core of earth-rock fill dam maybe induced, the mechanism by which the reason of hydraulic fracturing canbe explained, and the failure criterion by which the occurrence of hydraulicfracturing can be determined, were investigated. The condition dependson material properties such as, cracks in the core and low permeability ofcore soil, and “water wedging” action in cracks. An unsaturated core soiland fast impounding are the prerequisites for the formation of “waterwedging” action. The mechanism of hydraulic fracturing can be explainedby fracture mechanics. The crack propagation induced by water pressuremay follow any of mode I, mode II and mixed mode I-II. Based on testingresults of a core soil, a new criterion for hydraulic fracturing

  1. Environmental Risk Assessment System for Phosphogypsum Tailing Dams

    OpenAIRE

    Xin Sun; Ping Ning; Xiaolong Tang; Honghong Yi; Kai Li; Lianbi Zhou; Xianmang Xu

    2013-01-01

    This paper may be of particular interest to the readers as it provides a new environmental risk assessment system for phosphogypsum tailing dams. In this paper, we studied the phosphogypsum tailing dams which include characteristics of the pollution source, environmental risk characteristics and evaluation requirements to identify the applicable environmental risk assessment methods. Two analytical methods, that is, the analytic hierarchy process (AHP) and fuzzy logic, were used to handle the...

  2. Phytoplankton composition of Sazlidere Dam lake, Istanbul, Turkey

    Directory of Open Access Journals (Sweden)

    Nese Yilmaz

    2013-05-01

    Full Text Available The phytoplankton composition of Sazlidere Dam lake was studied at 5 sampling sites between December 2003 - November 2005. A total of 67 taxa were recorded, representing Bacillariophyta (31, Chlorophyta (18, Cyanophyta (9, Chrysophyta (1, Cryptophyta (1, Dinophyta (3 and Euglenophyta (4. Bacillariophyta members constituted the dominant phytoplankton group in terms of species number. Nygaard’s compound index value and composition of phytoplankton indicate that the trophic state of Sazlidere Dam lake was changing from oligotrophic to mesotrophic.

  3. Predicting soil erosion risk at the Alqueva dam watershed

    OpenAIRE

    Ferreira, Vera; Panagopoulos, Thomas

    2012-01-01

    Soil erosion is serious economic and environmental concern. Assessing soil erosion risk in the Alqueva dam watershed is urgently needed to conserve soil and water resources and prevent the accelerated dam siltation, taking into account the possible land-use changes, due to tourism development, intensification of irrigated farming and biomass production, as well as climate change. A comprehensive methodology that integrates Revised Universal Soil Loss Equation (RUSLE) model and Geographic Info...

  4. Reaching the end of the road [guidelines for decommissioning dams

    International Nuclear Information System (INIS)

    Austin, R.J.

    1998-01-01

    Some hydroelectric power plants in the United States date back as far as the last century when they were constructed to generated power and provide water, recreation and flood control for the growing economy. As these early dams age, an increasing number of retirement evaluations are needed. This article reviews the recently published ''''Guidelines for the Retirement of Dams and Hydroelectric Facilities'''' and explains its technical method of assessing the engineering, sediment management and environmental aspects of retirement evaluations. (UK)

  5. Wynoochee Lake and dam flood storage reevaluation study

    International Nuclear Information System (INIS)

    Lynch, C.J.

    1993-01-01

    With the desire to increase the revenue generating potential of the Wynoochee Lake and Dam Project the cities of Tacoma and Aberdeen, Washington, have pursued the potential for retrofitting a hydropower plant at the dam. The feasibility of the hydropower plant is dependent on higher average head for power generation. This paper discusses the Corps of Engineers reevaluation of the winter flood control requirements with the aim of raising the elevation of the winter operating pool

  6. Experimentally induced gestational androgen excess disrupts glucoregulation in rhesus monkey dams and their female offspring.

    Science.gov (United States)

    Abbott, David H; Bruns, Cristin R; Barnett, Deborah K; Dunaif, Andrea; Goodfriend, Theodore L; Dumesic, Daniel A; Tarantal, Alice F

    2010-11-01

    Discrete fetal androgen excess during early gestation in rhesus monkeys (Macaca mulatta) promotes endocrine antecedents of adult polycystic ovary syndrome (PCOS)-like traits in female offspring. Because developmental changes promoting such PCOS-like metabolic dysfunction remain unclear, the present study examined time-mated, gravid rhesus monkeys with female fetuses, of which nine gravid females received 15 mg of testosterone propionate (TP) subcutaneously daily from 40 to 80 days (first to second trimesters) of gestation [term, mean (range): 165 (155-175) days], whereas an additional six such females received oil vehicle injections over the same time interval. During gestation, ultrasonography quantified fetal growth measures and was used as an adjunct for fetal blood collections. At term, all fetuses were delivered by cesarean section for postnatal studies. Blood samples were collected from dams and infants for glucose, insulin, and total free fatty acid (FFA) determinations. TP injections transiently accelerated maternal weight gain in dams, very modestly increased head diameter of prenatally androgenized (PA) fetuses, and modestly increased weight gain in infancy compared with concurrent controls. Mild to moderate glucose intolerance, with increased area-under-the-curve circulating insulin values, occurred in TP-injected dams during an intravenous glucose tolerance test in the early second trimester. Moreover, reduced circulating FFA levels occurred in PA fetuses during a third trimester intravenous glucagon-tolbutamide challenge (140 days gestation), whereas excessive insulin sensitivity and increased insulin secretion relative to insulin sensitivity occurred in PA infants during an intravenous glucose-tolbutamide test at ∼1.5 mo postnatal age. Data from these studies suggest that experimentally induced fetal androgen excess may result in transient hyperglycemic episodes in the intrauterine environment that are sufficient to induce relative increases in

  7. 'Chaos' in superregenerative receivers

    International Nuclear Information System (INIS)

    Commercon, Jean-Claude; Badard, Robert

    2005-01-01

    The superregenerative principle has been known since the early 1920s. The circuit is extremely simple and extremely sensitive. Today, superheterodyne receivers generally supplant superregenerative receivers in most applications because there are several undesirable characteristics: poor selectivity, reradiation, etc. Superregenerative receivers undergo a revival in recent papers for wireless systems, where low cost and very low power consumption are relevant: house/building meters (such as water, energy, gas counter), personal computer environment (keyboard, mouse), etc. Another drawback is the noise level which is higher than that of a well-designed superheterodyne receiver; without an antenna input signal, the output of the receiver hears in an earphone as a waterfall noise; this sound principally is the inherent input noise amplified and detected by the circuit; however, when the input noise is negligible with respect of an antenna input signal, we are faced to an other source of 'noise' self-generated by the superregenerative working. The main objective of this paper concerns this self-generated noise coming from an exponential growing followed by a re-injection process for which the final state is a function of the phase of the input signal

  8. Dams and Development in the French Alps in the Inter-war Period

    Directory of Open Access Journals (Sweden)

    Anne Dalmasso

    2009-03-01

    Full Text Available La vigueur de la « controverse des grands barrages » du début des années 2000 nous amène à nous interroger, dans cet article, sur les conditions de l’accueil fait aux barrages alpins lors de leur première phase de construction dans les années 1920 et 1930. Si l’ampleur des impacts, sociaux et environnementaux est différente, la nature des questions posées concernant les modes d’appropriation et d’usage de l’eau demeure. Au-delà des discours justificateurs ou accusateurs, structurés de façon pérenne autour de la promotion ou de la dénonciation des vertus de la modernisation et du développement, l’acceptabilité des barrages dépend d’abord des perturbations introduites dans la répartition des droits de propriétés et d’usages du territoire et de la capacité à compenser gains et pertes entre les groupes sociaux concernés. Ces questions sont travaillées à partir de deux cas de construction dans les Alpes françaises durant les années 1930, ceux du barrage du Chambon et du Sautet.The heated discussions and controversies over large dams that marked the start of the 21st century have led us in this article to examine the conditions under which Alpine dams were received during the first construction phase of the 1920s and 1930s. Although the extent of social and environ-mental impacts was not the same, the types of questions raised concerning methods of appropriation and uses to which water was put are similar. Among the arguments for and against, which always tend to be structured around the promotion or denunciation of the virtues of modernisation and development, the acceptability of dams depends firstly on the disturbances caused to the distribution of property rights and land usage rights and the ability to balance out gains and losses among the different social groups concerned. These questions are examined in the light of two dams constructed in the French Alps in the 1930s, the Chambon and Sautet dams.

  9. Dam failure analysis for the Lago de Matrullas Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Torres-Sierra, Heriberto; Gómez-Fragoso, Julieta

    2015-01-01

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed a hydrologic and hydraulic study to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago de Matrullas Dam, located within the headwaters of the Río Grande de Manatí. The hydrologic study yielded outflow hydrographs and peak discharges for Lago de Matrullas and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation (PMP) event, (2) a 24-hour PMP event, and (3) a 100-year-recurrence, 24-hour rainfall event. The hydraulic study simulated the hypothetical dam failure of Lago de Matrullas using hypothetical flood hydrographs generated from the hydrologic study and selected dam breach parameters. The flood wave resulting from the failure was downstream-routed through the lower reaches of the Río Matrullas, the Río Toro Negro, and the Río Grande de Manatí for determination of water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” (no precipitation) conditions. The Hydrologic Modeling System (HEC–HMS) and the River Analysis System (HEC–RAS) computer programs, developed by the Hydrologic Engineering Center (HEC) of the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was performed using the unsteady-state flow module available in the HEC–RAS model.

  10. The Social, Historical, and Institutional Contingencies of Dam Removal

    Science.gov (United States)

    Magilligan, F. J.; Sneddon, C. S.; Fox, C. A.

    2017-06-01

    Environmental managers in the United States and elsewhere are increasingly perceiving dam removal as a critical tool for river restoration and enhancing watershed resilience. In New England, over 125 dams have been dismantled for ecological and economic rationales. A surprising number of these removals, including many that are ongoing, have generated heated conflicts between restoration proponents and local communities who value their dammed landscapes. Using a comparative case study approach, we examine the environmental conflict around efforts to remove six dams in New England. Each of these removal efforts followed quite different paths and resultant outcomes: successful removal, stalled removal, and failure despite seemingly favorable institutional conditions. Lengthy conflicts often transpired in instances where removals occurred, but these were successfully arbitrated by paying attention to local historical-geographical conditions conducive to removal and by brokering effective compromises between dam owners and the various local actors and stakeholders involved in the removal process. Yet our results across all cases suggest that these are necessary, but not sufficient conditions for restoration through dam removal since a similar set of conditions typified cases where removals are continuously stalled or completely halted. Scholars examining the intersection between ecological restoration and environmental politics should remain vigilant in seeking patterns and generalities across cases of environmental conflict in order to promote important biophysical goals, but must also remain open to the ways in which those goals are thwarted and shaped by conflicts that are deeply contingent on historical-geographical conditions and broader institutional networks of power and influence.

  11. Feasibility of groundwater recharge dam projects in arid environments

    Science.gov (United States)

    Jaafar, H. H.

    2014-05-01

    A new method for determining feasibility and prioritizing investments for agricultural and domestic recharge dams in arid regions is developed and presented. The method is based on identifying the factors affecting the decision making process and evaluating these factors, followed by determining the indices in a GIS-aided environment. Evaluated parameters include results from field surveys and site visits, land cover and soils data, precipitation data, runoff data and modeling, number of beneficiaries, domestic irrigation demand, reservoir objectives, demography, reservoirs yield and reliability, dam structures, construction costs, and operation and maintenance costs. Results of a case study on more than eighty proposed dams indicate that assessment of reliability, annualized cost/demand satisfied and yield is crucial prior to investment decision making in arid areas. Irrigation demand is the major influencing parameter on yield and reliability of recharge dams, even when only 3 months of the demand were included. Reliability of the proposed reservoirs as related to their standardized size and net inflow was found to increase with increasing yield. High priority dams were less than 4% of the total, and less priority dams amounted to 23%, with the remaining found to be not feasible. The results of this methodology and its application has proved effective in guiding stakeholders for defining most favorable sites for preliminary and detailed design studies and commissioning.

  12. Hydraulic fracture considerations in oil sand overburden dams

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, R.; Madden, B.; Danku, M. [Syncrude Canada Ltd., Fort McMurray, AB (Canada)

    2008-07-01

    This paper discussed hydraulic fracture potential in the dry-filled temporary dams used in the oil sands industry. Hydraulic fractures can occur when reservoir fluid pressures are greater than the minimum stresses in a dam. Stress and strain conditions are influenced by pore pressures, levels of compaction in adjacent fills as well as by underlying pit floor and abutment conditions. Propagation pressure and crack initiation pressures must also be considered in order to provide improved hydraulic fracture protection to dams. Hydraulic fractures typically result in piping failures. Three cases of hydraulic fracture at oil sands operations in Alberta were presented. The study showed that hydraulic fracture failure modes must be considered in dam designs, particularly when thin compacted lift of dry fill are used to replace wetted clay cores. The risk of hydraulic fractures can be reduced by eliminating in situ bedrock irregularities and abutments. Overpressure heights, abutment sloping, and the sloping of fills above abutments, as well as the dam's width and base conditions must also be considered in relation to potential hydraulic fractures. It was concluded that upstream sand beaches and internal filters can help to prevent hydraulic fractures in dams in compacted control zones. 5 refs., 16 figs.

  13. Mechanism Research of Arch Dam Abutment Forces during Overload

    Directory of Open Access Journals (Sweden)

    Yu Xia

    2015-01-01

    Full Text Available This paper presents research on the abutment forces of a double-curvature arch dam during overload based on numerical calculation results obtained through finite element method by Ansys. Results show that, with an increase in elevation, the abutment forces and bending moment of the arch dam increase first and then decrease from the bottom to the top of the dam. Abutment forces and bending moment reach their maximum at the middle or middle-down portion of the dam. The distributions of abutment forces and moment do not change during overload. The magnitude of each arch layer’s forces and moment increases linearly during overload. This result indicates that each arch layer transmits bearing loads to the rocks of the left and right banks steadily. This research explains the operating mechanism of an arch dam under normal and overload conditions. It provides a simple method to calculate the distribution of forces Fx and Fy and a new method to calculate the overload factor of an arch dam through the estimation of arch layers based on the redistribution characteristic of arch abutment forces.

  14. Climate change and the causes of dam failures in Australia

    International Nuclear Information System (INIS)

    Lewis, B.

    2007-01-01

    As a result of poor dam construction methods in Australia and significant droughts occurring over the past 60 years, there is a danger that mistakes made during previous droughts will be repeated. Dams were often built in soils of very low moisture content to ensure a properly compacted bank. As a result of these poor construction methods, the drought years have produced an unusually high number of dam failures. This paper discussed the causes of dam failures such as dispersive clays and defects in associated structures. The discussion on dispersive clays included cracking, piping, tunneling, and slides. Dispersive clays occur in soils whose clay minerals separate into single grains when placed in contact with water and are associated with high soil erodability and their distribution often coincides with the occurrence of erosion gullying, rilling and piping. Dispersive clays in a dam embankment can result in the leaching out of material from the embankment with consequent erosion and failure. Defects in associated structures that were discussed included spillway blockage and outlet pipe blockage. It was concluded that dam failures are seldom due to one particular cause but rather due to one weakness triggering another. It was concluded that failures are difficult and expensive to remedy. 9 refs., 4 figs

  15. The Social, Historical, and Institutional Contingencies of Dam Removal.

    Science.gov (United States)

    Magilligan, F J; Sneddon, C S; Fox, C A

    2017-06-01

    Environmental managers in the United States and elsewhere are increasingly perceiving dam removal as a critical tool for river restoration and enhancing watershed resilience. In New England, over 125 dams have been dismantled for ecological and economic rationales. A surprising number of these removals, including many that are ongoing, have generated heated conflicts between restoration proponents and local communities who value their dammed landscapes. Using a comparative case study approach, we examine the environmental conflict around efforts to remove six dams in New England. Each of these removal efforts followed quite different paths and resultant outcomes: successful removal, stalled removal, and failure despite seemingly favorable institutional conditions. Lengthy conflicts often transpired in instances where removals occurred, but these were successfully arbitrated by paying attention to local historical-geographical conditions conducive to removal and by brokering effective compromises between dam owners and the various local actors and stakeholders involved in the removal process. Yet our results across all cases suggest that these are necessary, but not sufficient conditions for restoration through dam removal since a similar set of conditions typified cases where removals are continuously stalled or completely halted. Scholars examining the intersection between ecological restoration and environmental politics should remain vigilant in seeking patterns and generalities across cases of environmental conflict in order to promote important biophysical goals, but must also remain open to the ways in which those goals are thwarted and shaped by conflicts that are deeply contingent on historical-geographical conditions and broader institutional networks of power and influence.

  16. Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013

    Energy Technology Data Exchange (ETDEWEB)

    Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Colotelo, Alison HA [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xinya [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-01

    In 2012 and 2013, Pacific Northwest National Laboratory conducted a study that summarized the passage proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged-kelts. Kelts were also tagged with Passive Integrated Transponder tags to monitor passage through juvenile bypass systems and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify individual, behavioral, environmental and dam operation variables that were related to passage and survival of steelhead kelts that passed through FCRPS dams. Bayesian model averaging of multivariable logistic regression models was used to identify the environmental, temporal, operational, individual, and behavioral variables that had the highest probability of influencing the route of passage and the route-specific survival probabilities for kelts that passed Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams in 2012 and 2013. The posterior probabilities of the best models for predicting route of passage ranged from 0.106 for traditional spill at LMN to 0.720 for turbine passage at LGS. Generally, the behavior (depth and near-dam searching activity) of kelts in the forebay appeared to have the greatest influence on their route of passage. Shallower-migrating kelts had a higher probability of passing via the weir and deeper-migrating kelts had a higher probability of passing via the JBS and turbines than other routes. Kelts that displayed a higher level of near-dam searching activity had a higher probability of passing via the spillway weir and those that did less near-dam searching had a higher probability of passing via the JBS and

  17. Public safety around dams : proposed technical bulletins

    Energy Technology Data Exchange (ETDEWEB)

    Raska, C [BC Hydro, Burnaby, BC (Canada); Rowat, L [Ontario Power Generation Inc., Niagara Falls, ON (Canada)

    2009-07-01

    This presentation provided an introduction to the Canadian Dam Association (CDA) public safety guideline and proposed technical bulletins for exterior danger and warning signs; waterway booms and buoys; and audible and visual alerts for water conveyance structures. The presentation outlined the hierarchy of documents for principles, guidelines and technical bulletins. Effective signage includes signs in which the text is sized according to the viewing distance; the message identifies the hazard and the actions to take; and the wording is understood by the public. The criteria for effective booms and buoys were discussed in terms of visibility of booms; types of buoys to use; distance between booms floats; design issues for headpond application versus tailrace application; angling to facilitate self-rescue; and distance from structure. Proposed criteria for audible and visual alerts were also discussed. The audible and visual danger signal should have a designated signal reception area where people can recognize and react to the signal. If a visual signalling device is used, it should be red to indicate danger. Maintenance and inspection tests should be performed regularly on audible and visual signalling devices. 1 ref., 2 figs.

  18. Derivation of Operation Rule for Ilisu Dam

    Directory of Open Access Journals (Sweden)

    Ahmed Abdul-Sahib Mohammed Ali

    2018-06-01

    Full Text Available Tigris River water that comes from Turkey represents the main water resource of this river in Iraq. The expansion in water river implementations has formed a source of trouble for the workers in the water resources management field in Iraqi. Unfortunately, there is no agreement between Iraq and Turkey till now to share the water of this international river. Consequently, the optimal operation of water resources systems, particularly a multi-objective, multi-reservoir, is of the most necessity at the present time. In this research two approaches, were used the dynamic programming (DP approach and simulation model to find the optimal monthly operation of Ilisu Dam (from an Iraqi point of view through a computer program (in Q. Basic language to find the optimum monthly release and storage by adopting an objective function that minimizes the release and storage losses (penalty. The historical inflow data of 588 months from (Oct. 1961 to Sep. 2009 formed the input data to the optimization models. Storage rule curves for the reservoir at (lower, mean, upper of (10%, 50%, and 90%, respectively, were found according to the results of the optimized operation. A simulation model was developed to operate the system using these rule curves.

  19. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  20. Remote sensing applications for the dam industry

    Energy Technology Data Exchange (ETDEWEB)

    Pryse-Phillips, A.; Woolgar, R. [Hatch Ltd., St. John' s, NL (Canada); Puestow, T.; Warren, S. [Memorial Univ. of Newfoundland, St. John' s, NL (Canada). C-Core; Rogers, K. [Nalcor Energy, St. John' s, NL (Canada); Khan, A. [Government of Newfoundland and Labrador, St. Johns, NL (Canada)

    2009-07-01

    There has been an increase in the earth observation missions providing satellite imagery for operational monitoring applications. This technique has been found to be especially useful for the surveillance of large, remote areas, which is challenging to achieve in a cost-effective manner by conventional field-based or aerial means. This paper discussed the utility of satellite-based monitoring for different applications relevant to hydrology and water resources management. Emphasis was placed on the monitoring of river ice covers in near, real-time and water resources management. The paper first outlined river ice monitoring using remote sensing on the Lower Churchill River. The benefits of remote sensing over traditional survey methods for the dam industry was then outlined. Satellite image acquisition and interpretation for the Churchill River was then presented. Several images were offered. Watershed physiographic characterization using remote sensing was also described. It was concluded that satellite imagery proved to be a useful tool to develop physiographic characteristics when conducting rainfall-runoff modelling. 3 refs., 1 tab., 11 figs.

  1. How many more dams in the Amazon?

    International Nuclear Information System (INIS)

    Tundisi, J.G.; Goldemberg, J.; Matsumura-Tundisi, T.; Saraiva, A.C.F.

    2014-01-01

    The Amazon watershed harbors a megadiversity of terrestrial and aquatic plants and animals. Mechanisms that sustain this biodiversity are the water level fluctuations the fluvial dynamics and the intense gene flux due to permanent integration of climatological, geomorphological and biological components of the system. The construction of hydroelectric reservoirs to support economic development of Brazil and other countries that share the Amazon basin will interfere with the ecological dynamics of this ecosystem changing the hydrological, hydrosocial and fundamental processes. Furthermore the construction of Andean reservoirs can disrupt the connectivity with the lower Amazon ecosystem. Principles of ecohydrologies, ecological engineering and preservation of key river basins, have to be applied in order to optimize energy production and promote conservation practices. Long term planning and integration of countries that share the Amazon basin is a strategic decision to control and develop the hydropower exploitation in the region. - Highlights: • The Amazon basin is an ecosystem of megadiversity. • The demand for energy threatens this ecosystem. • Climate, water, forests and floodplain interacts in the Amazon basin. • Dams in the Amazon basin will impact the hydrological and biological systems. • Ecohydrological principles and ecological engineering technology are necessary

  2. Nubia's mother: being pregnant in the time of experimental vaccines and therapeutics for Ebola.

    Science.gov (United States)

    Caluwaerts, Séverine

    2017-12-14

    During the 2014-2016 Ebola epidemic, Médecins Sans Frontières (MSF) treated Ebola-positive pregnant women in its Ebola Treatment Centers (ETCs). For pregnant women with confirmed Ebola virus disease, inclusion in clinical vaccine/drug/therapeutic trials was complicated. Despite their extremely high Ebola-related mortality in previous epidemics (89-93%) and a neonatal mortality of 100%, theoretical concerns about safety of vaccines and therapeutics in pregnancy were invoked, limiting pregnant women's access to an experimental live attenuated vaccine and brincidofovir, an experimental antiviral. Favipiravir, another experimental antiviral, was made available to pregnant women only after extensive negotiations and under a 'Monitored Emergency Use of Unregistered and Experimental Interventions' (MEURI) protocol. This paper describes the case of a pregnant woman who presented to the ETCs near the end of the Ebola epidemic in Guinea. The pregnant patient was admitted with confirmed Ebola disease. She was previously denied access to potentially protective vaccination due to pregnancy, and access to experimental ZMapp was only possible through a randomized clinical trial (presenting a 50% chance of not receiving ZMapp). She received favipiravir, but died of Ebola-related complications. The infant, born in the ETC, tested positive for Ebola at birth. The infant received ZMapp (under MEURI access outside of the clinical trial), an experimental drug GS5734, and a buffy coat of an Ebola survivor, and survived. Though the infant did have access to experimental therapeutics within 24 h of birth, access to other experimental compounds for her mother was denied, raising serious ethical concerns.

  3. Plasma concentration of atrial natriuretic peptide in normal pregnant women and in pregnant women with preeclampsia

    DEFF Research Database (Denmark)

    Mikkelsen, A L; Schütten, G; Asping, U

    1991-01-01

    Plasma concentration of atrial natriuretic peptide (ANP) was determined in pregnant women with preeclampsia, in normal pregnant and in nonpregnant women by a specific radioimmunoassay. Results did not show important differences between nonpregnant controls and normal pregnant women, but a signifi......Plasma concentration of atrial natriuretic peptide (ANP) was determined in pregnant women with preeclampsia, in normal pregnant and in nonpregnant women by a specific radioimmunoassay. Results did not show important differences between nonpregnant controls and normal pregnant women......, but a significant rise was seen in women with preeclampsia compared to nonpregnant controls. Marked interindividual variation was found in all three groups. The mechanism of ANP release may differ between those women with normal pregnancy and those with preeclampsia. It is unclear whether the increased level of ANP...... in preeclampsia is an effect or a cause of the disease....

  4. National Program for Inspection of Non-Federal Dams. Tihonet Pond Number 2 Dam (MA 00030), Massachusetts Coastal Basin, Wareham, Massachusetts. Phase I Inspection Report.

    Science.gov (United States)

    1981-07-01

    drainage area above the dam is 8.1 square miles. The watershed is characterized by irregular topography: cranberry bogs, small ponds and depressions ...and recreational purposes. Water from this pond is used in the U irrigation of cranberry bogs downstream. The maximum storage capacity of the dam is...295-1000 g. PURPOSE OF DAM The dam impounds Tihonet Pond which is a storage reservoir 4_- 4 4: . * used principally for irrigating cranberry bogs which

  5. National Dam Safety Program. Potake Lake Dam (Inventory Number N.Y. 970), Passaic River Basin, Lower Hudson River Area, Rockland County, New York. Phase I Inspection Report,

    Science.gov (United States)

    1981-08-14

    facilitate thedischarge of storm flows. 2. The animal burrows, depressions , and tire ruts onthe crest of the dam should be filled, compacted and seeded. 3...storm flows. 2. The animal burrows, depressions , and tire ruts on the crest of the dam should be filled, compacted, and seeded...defined by the Recommended Guidelines for Safety Inspection of Dams (Reference 13, Appendix D). d. Hazard Classifications - Cranberry Lake Dam is one mile

  6. Solar thermal central receivers

    International Nuclear Information System (INIS)

    Vant-Hull, L.L.

    1993-01-01

    Market issues, environmental impact, and technology issues related to the Solar Central Receiver concept are addressed. The rationale for selection of the preferred configuration and working fluid are presented as the result of a joint utility-industry analysis. A $30 million conversion of Solar One to an external molten salt receiver would provide the intermediate step to a commercial demonstration plant. The first plant in this series could produce electricity at 11.2 cents/kWhr and the seventh at 8.2 cents/kWhr, completely competitive with projected costs of new utility plants in 1992

  7. Wideband CMOS receivers

    CERN Document Server

    Oliveira, Luis

    2015-01-01

    This book demonstrates how to design a wideband receiver operating in current mode, in which the noise and non-linearity are reduced, implemented in a low cost single chip, using standard CMOS technology.  The authors present a solution to remove the transimpedance amplifier (TIA) block and connect directly the mixer’s output to a passive second-order continuous-time Σ∆ analog to digital converter (ADC), which operates in current-mode. These techniques enable the reduction of area, power consumption, and cost in modern CMOS receivers.

  8. Qu'Appelle River Dam, dam break analysis using advanced GIS tools for rapid modelling and inundation mapping

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, D. [Hatch Energy, Winnipeg, MB (Canada); Campbell, C. [Saskatchewan Watershed Authority, Moose Jaw, SK (Canada); Groeneveld, J. [Hatch Energy, Calgary, AB (Canada)

    2008-07-01

    The South Saskatchewan River Project (SSRP) comprises a multi-purpose reservoir that provides water for conservation and irrigation, flood control, power generation, recreation, and municipal and industrial water supply. In addition to the 64 m high Gardiner Dam, the 27 m high Qu'Appelle River Dam and the 22 km long Lake Diefenbaker Reservoir, the SSRP also includes ancillary works. The Qu'Appelle River valley extends for 458 km before connecting to the Assiniboine River. The valley is incised up to 90 m in depth and is a popular cottaging and recreational area with several major communities located in the flood plain. In the event of a breach of the Qu'Appelle Dam, the discharge will increase from a normal maximum discharge of under 60 m{sup 3} per second to over 50,000 m{sup 3} per second. The Saskatchewan Watershed Authority (SWA) is responsible for ensuring safe development of the Province's water resources, without affecting reservoir or lake operations, and preventing damage from flooding, erosion or land slides. It is in the process of developing Hazard Assessments and emergency preparedness plans for each of their dams in accordance with the Canadian Dam Safety Guidelines. Studies using GIS technology and the hydrodynamic routing model HEC-RAS have been completed to evaluate the potential inundation that may result in the event of failure of the Qu'Appelle River Dam. These studies involved the development of a breach parameter model using a breach data set revised to better reflect the Qu'Appelle River Dam; the development of a dam break model for the Qu'Appelle River Dam and downstream river and flood plain; and, the use of this model to simulate two potential dam failure scenarios for the Qu'Appelle River Dam, notably failure during passage of the PMF and failure during fair weather conditions. Inundation maps have been prepared for the downstream Qu'Appelle River valley for each of the above events. 3 refs., 4

  9. Mefloquine for preventing malaria in pregnant women.

    Science.gov (United States)

    González, Raquel; Pons-Duran, Clara; Piqueras, Mireia; Aponte, John J; Ter Kuile, Feiko O; Menéndez, Clara

    2018-03-21

    The World Health Organization recommends intermittent preventive treatment in pregnancy (IPTp) with sulfadoxine-pyrimethamine for malaria for all women who live in moderate to high malaria transmission areas in Africa. However, parasite resistance to sulfadoxine-pyrimethamine has been increasing steadily in some areas of the region. Moreover, HIV-infected women on cotrimoxazole prophylaxis cannot receive sulfadoxine-pyrimethamine because of potential drug interactions. Thus, there is an urgent need to identify alternative drugs for prevention of malaria in pregnancy. One such candidate is mefloquine. To assess the effects of mefloquine for preventing malaria in pregnant women, specifically, to evaluate:• the efficacy, safety, and tolerability of mefloquine for preventing malaria in pregnant women; and• the impact of HIV status, gravidity, and use of insecticide-treated nets on the effects of mefloquine. We searched the Cochrane Infectious Diseases Group Specialized Register, the Cochrane Central Register of Controlled Trials (CENTRAL) in the Cochrane Library, MEDLINE, Embase, Latin American Caribbean Health Sciences Literature (LILACS), the Malaria in Pregnancy Library, and two trial registers up to 31 January 2018. In addition, we checked references and contacted study authors to identify additional studies, unpublished data, confidential reports, and raw data from published trials. Randomized and quasi-randomized controlled trials comparing mefloquine IPT or mefloquine prophylaxis against placebo, no treatment, or an alternative drug regimen. Two review authors independently screened all records identified by the search strategy, applied inclusion criteria, assessed risk of bias, and extracted data. We contacted trial authors to ask for additional information when required. Dichotomous outcomes were compared using risk ratios (RRs), count outcomes as incidence rate ratios (IRRs), and continuous outcomes using mean differences (MDs). We have presented all

  10. National Dam Safety Program. Junior Lake Dam, (MO 11526) Missouri - Kansas City Basin, Callaway County, Missouri. Phase I Inspection Report.

    Science.gov (United States)

    1980-10-01

    Lake, Dam Inspection, Private Dams 20 AWTACT (Ce ffm ew - m*1et N naeey ad identfy by block number) This report was prepared under the National Program...cO r " 7 - IM-.r Il: r’ o .rrr4 QM zc PLT DL1 ~OC.4..NW to~.. c pz acca ~ ~ ~ 0 AaO cr~c 0000000000 ca~cc 0 NOCC~C ~ j...a ~ in =o ,0 0 00 O 0~ co

  11. The elimination, distribution, and metabolism of 14C-toxaphene in the pregnant rat

    International Nuclear Information System (INIS)

    Pollock, G.A.; Hillstrand, R.

    1982-01-01

    Pregnant Sprague-Dawley rats were orally administered 14 C-toxaphene in olive oil on day 15 of pregnancy and housed in glass metabolism cages. Urine, feces, and tissues were collected and assayed for radioactivity. The elimination was similar to that in virgin females with the majority of activity excreted in the feces (38.4%; five days) and less in the urine (23.7%; five days). The fetuses contained the lowest levels of radioactivity of all tissues tested (28 ppb; five days) and fat contained the highest levels (7476 ppb; five days). A comparison of the activity in the fetuses with that in the dam's fat showed slight differences, indicating the presence of more polar compounds (perhaps metabolites)

  12. Effects of cloned-cattle meat diet on reproductive parameters in pregnant rabbits.

    Science.gov (United States)

    Lee, Nam-Jin; Yang, Byoung-Chul; Hwang, Jae-Sik; Im, Gi-Sun; Ko, Yeoung-Gyu; Park, Eung-Woo; Seong, Hwan-Hoo; Park, Soo-Bong; Kang, Jong-Koo; Hwang, Seongsoo

    2010-03-01

    In this paper, we report on the effects of a diet containing cloned-cattle meat on the reproductive parameters in pregnant rabbits. The artificially inseminated rabbits (gestation day 0) were fed a diet containing 5% or 10% of normal or cloned-cattle meat during the gestation period. Rabbits fed commercial pellet (no additional supplementations) were used as the control. Supplementation of cloned-cattle meat diets did not have any toxicologically significant effects on reproductive performance in dams (body weight, clinical signs, organ weight, and cesarean section analysis). And it also did not affect on fetal development (body and placental weight, and external, visceral and skeletal findings) compared to the controls. The only difference was a food consumption in the first week of gestation for all meat-based diet groups (pmeat. Copyright (c) 2010 Elsevier Ltd. All rights reserved.

  13. Antagonistic effects of cadmium on lead accumulation in pregnant and non-pregnant mice

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Euan, E-mail: euan.smith@unisa.edu.au [Centre for Environmental Risk Assessment and Remediation, University of South Australia, Mawson Lakes, SA 5095 (Australia); Gancarz, Dorota; Rofe, Allan [Veterinary Services Division, Institute of Medical and Veterinary Science, Gilles Plains, SA 5086 (Australia); Kempson, Ivan M. [Institute of Physics, Academia Sinica, 128 Academia Road, Section 2, Nankang, Taipei 11529, Taiwan (China); Weber, John; Juhasz, Albert L. [Centre for Environmental Risk Assessment and Remediation, University of South Australia, Mawson Lakes, SA 5095 (Australia)

    2012-01-15

    Highlights: Black-Right-Pointing-Pointer We investigate the exposure of pregnant and non-pregnant mice to cadmium (Cd) on lead (Pb) contaminated soil. Black-Right-Pointing-Pointer We examine the changes in lead accumulation in mice due to the presence of cadmium in soil. Black-Right-Pointing-Pointer Lead accumulation is higher in pregnant compared to non-pregnant mice. Black-Right-Pointing-Pointer Cadmium decreases lead accumulation in all mice irrespective of status. - Abstract: People are frequently exposed to combinations of contaminants but there is a paucity of data on the effects of mixed contaminants at low doses. This study investigated the influence of cadmium (Cd) on lead (Pb) accumulation in pregnant and non-pregnant mice following exposure to contaminated soil. Exposure to Pb from contaminated soils increased Pb accumulation in both pregnant and non-pregnant mice compared to unexposed control animals (pregnant and non-pregnant). Lead accumulation in the liver and kidneys of exposure pregnant mice (40 {+-} 15 mg Pb kg{sup -1}) was significantly higher (P < 0.05) than concentrations detected in control pregnant mice (<1 mg Pb kg{sup -1}). The presence of Cd in contaminated soil had a major effect on the Pb and Fe accumulation in the kidneys and liver, respectively. This study shows that Pb uptake is mediated by the presence of Cd in the co-contaminated soil and demonstrates that further research is required to investigate the influence of co-contaminants on human exposure at sub-chronic concentrations.

  14. Intermediate filaments in smooth muscle from pregnant and non-pregnant human uterus.

    OpenAIRE

    Leoni, P; Carli, F; Halliday, D

    1990-01-01

    The intermediate filament proteins desmin and vimentin from pregnant and non-pregnant uterine muscle and smooth-muscle cells in culture were analysed using SDS/PAGE. The desmin content in uterine muscle increases dramatically during pregnancy, whereas vimentin remains unchanged or changes very little. When muscle cells are kept in culture, a considerable increase in vimentin content is observed as compared with vimentin in freshly isolated non-pregnant uterine tissue. Our results strengthen t...

  15. Health & Nutrition Information for Pregnant & Breastfeeding Women

    Science.gov (United States)

    ... Adults Moms/ Moms-to-Be Print Share Health & Nutrition Information When you are pregnant or breastfeeding, you ... Story Last Updated: Apr 27, 2018 RESOURCES FOR NUTRITION AND HEALTH MYPLATE What Is MyPlate? Fruits Vegetables ...

  16. pulmonary tuberculosis among pregnant mothers in tanzania

    African Journals Online (AJOL)

    It is estimated that TB infection is present in one- third of the world's ... tuberculosis among pregnant women would be as high as in .... previous two years appeared to confer an increased ... limited to the immediate neighborhood or workplace.

  17. Zika Virus: Protecting Pregnant Women and Babies

    Science.gov (United States)

    ... Digital Press Kit Read the MMWR Science Clips Zika Virus Protecting Pregnant Women and Babies Language: English (US) ... Spanish) Recommend on Facebook Tweet Share Compartir Overview Zika virus infection (Zika) during pregnancy can cause damage to ...

  18. Glucose tolerance test - non-pregnant

    Science.gov (United States)

    ... for energy. People with untreated diabetes have high blood glucose levels. Most often, the first tests used to diagnose ... in people who are not pregnant are: Fasting blood glucose level: diabetes is diagnosed if it is higher than ...

  19. Guided Imagery and Stress in Pregnant Adolescents.

    Science.gov (United States)

    Flynn, Theresa A; Jones, Brittney A; Ausderau, Karla K

    2016-01-01

    We examined the effects of a guided imagery intervention on perceived stress in pregnant adolescents. Thirty-five pregnant adolescents recruited from a local alternative education program participated in a guided imagery intervention. Participants listened to a pregnancy-specific guided imagery recording on four separate occasions during their pregnancies. Perceived stress was measured immediately before and after each session using the Perceived Stress Measure-9 (PSM-9). Participants' pre- and postsession PSM-9 scores for three of the four sessions demonstrated a significant reduction in stress. Participants' baseline stress levels also decreased significantly across the four listening sessions. The greatest reductions in stress within and between sessions occurred in the early sessions, with effects diminishing over time. Pregnant teens experienced initial short- and long-term stress reduction during a guided imagery intervention, supporting the use of guided imagery to reduce stress in pregnant adolescents. Copyright © 2016 by the American Occupational Therapy Association, Inc.

  20. Reactive Protein Synthesis in Pregnant Rats

    African Journals Online (AJOL)

    olayemitoyin

    Department of Physiology, College of Medicine, University of Lagos, Nigeria. Summary: Genistein ... Oral exposure of pregnant rats to genistein precipitated hypothyroidism, altered some metabolic hormones with a ... consumption. Exposure to ...

  1. Factors affecting route selection and survival of steelhead kelts at Snake River dams in 2012 and 2013

    Energy Technology Data Exchange (ETDEWEB)

    Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Colotelo, Alison H. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xinya [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Green, Ethan D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-03-31

    In 2012 and 2013, Pacific Northwest National Laboratory (PNNL) conducted a study that summarized the passage route proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged kelts. Kelts were also tagged with passive integrated transponder tags to monitor passage through juvenile bypass systems (JBS) and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify environmental, temporal, operational, individual, and behavioral variables that were related to forebay residence time, route of passage, and survival of steelhead kelts at FCRPS dams on the Snake River. Multiple approaches, including 3-D tracking, bivariate and multivariable regression modeling, and decision tree analyses were used to identify the environmental, temporal, operational, individual, and behavioral variables that had the greatest effect on forebay residence time, route of passage, and route-specific and overall dam passage survival probabilities for tagged kelts at Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams. In general, kelt behavior and discharge appeared to work independently to affect forebay residence times. Kelt behavior, primarily approach location, migration depth, and “searching” activities in the forebay, was found to have the greatest influence on their route of passage. The condition of kelts was the single most important factor affecting their survival. The information gathered in this study may be used by dam operators and fisheries managers to identify potential management actions to improve in-river survival of kelts or collection methods for kelt reconditioning programs to aid

  2. Receiver gain function: the actual NMR receiver gain

    OpenAIRE

    Mo, Huaping; Harwood, John S.; Raftery, Daniel

    2010-01-01

    The observed NMR signal size depends on the receiver gain parameter. We propose a receiver gain function to characterize how much the raw FID is amplified by the receiver as a function of the receiver gain setting. Although the receiver is linear for a fixed gain setting, the actual gain of the receiver may differ from what the gain setting suggests. Nevertheless, for a given receiver, we demonstrate that the receiver gain function can be calibrated. Such a calibration enables accurate compar...

  3. National Program for Inspection of Non-Federal Dams. Miller Pond Dam (CT 00154), Thames River Basin, Waterford, Connecticut. Phase I Inspection Report.

    Science.gov (United States)

    1980-08-01

    Road and adjacent to the Brook are likely to be impacted by dam failure. Because a breach of Miller Pond Dam would cause severe economic loss and the...TO THE ASSUMED SPILL CREST ELEVATION 3 WATER %. WACE ELEATCRS. SHOREI I NE AND 7AI NGTER COGRATIONS ARE APPROXIMATE, AS OBTAINED Dl"F I -t DAM INSECTION

  4. 5. decennial inspection of Tignes dam. Draining of the higher french dam; 5. inspection decennale du barrage de Tignes. Vidange du plus haut barrage de France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This document deals with the 5. decennial inspection of the Tignes dam. The Tignes dam has been drained to allow EDF and the public authorities to verify the dam wall, of 180 m high, in order to validate the next decade. The four steps of the drainage are described as the maintenance policy of such building. (A.L.B.)

  5. Campus Projects Receiving "Earmarks."

    Science.gov (United States)

    Schonberger, Benjamin

    1991-01-01

    Specific campus projects that Congress has directed federal agencies to support this year at over 120 colleges and universities are listed. The agencies neither requested support nor sponsored merit-based competitions for the awards. In some cases, the institutions have a history of receiving special federal treatment. (MSE)

  6. Enhancing mud supply from the Lower Missouri River to the Mississippi River Delta USA: Dam bypassing and coastal restoration

    Science.gov (United States)

    Kemp, G. Paul; Day, John W.; Rogers, J. David; Giosan, Liviu; Peyronnin, Natalie

    2016-12-01

    Sand transport to the Mississippi River Delta (MRD) remains sufficient to build wetlands in shallow, sheltered coastal bays fed by engineered diversions on the Mississippi River (MR) and its Atchafalaya River (AR) distributary. But suspended mud (silt & clay) flux to the coast has dropped from a mean of 390 Mt y-1 in the early 1950s, to 100 Mt y-1 since 1970. This fine-grained sediment travels deeper into receiving estuarine basins and plays a critical role in sustaining existing marshes. Virtually all of the 300 Mt y-1 of missing mud once flowed from the Missouri River (MOR) Basin before nearly 100 dams were built as part of the Pick-Sloan water development project. About 100 Mt y-1 is now intercepted by main-stem Upper MOR dams closed in 1953. But the remaining 200 Mt y-1 is trapped by impoundments built on tributaries to the Lower MOR in the 1950s and 1960s. Sediment flux during the post-dam high MOR discharge years of 1973, 1993 and 2011 approached pre-dam levels when tributaries to the Lower MOR, including the Platte and Kansas Rivers, contributed to flood flows. West bank tributaries drain a vast, arid part of the Great Plains, while those entering from the east bank traverse the lowlands of the MOR floodplain. Both provinces are dominated by highly erodible loess soils. Staunching the continued decline in MR fine-grained sediment flux has assumed greater importance now that engineered diversions are being built to reconnect the Lowermost MR to the MRD. Tributary dam bypassing in the Lower MOR basin could increase mud supply to the MRD by 100-200 Mt y-1 within 1-2 decades. Such emergency measures to save the MRD are compatible with objectives of the Missouri River Restoration and Platte River Recovery Programs to restore MOR riparian habitat for endangered species. Rapid mobilization to shunt fine-grained sediments past as many as 50 Lower MOR tributary dams in several U.S. states will undoubtedly require as much regional coordination and funding in the 21st

  7. Recommendations for physical activity for pregnant women

    Directory of Open Access Journals (Sweden)

    Mateja Videmšek

    2015-04-01

    Full Text Available Properly selected and prescribed physical activity during pregnancy has a favorable effects on the health of pregnant women and the fetus, and is excellent preparation for childbirth. Absolute and relative contraindications to exercise during pregnancy are well defined, as well as the warning signs to terminate exercise while pregnant. Knowledge of these is essential for physically active pregnant women and exercise professionals that work with pregnant women. Pregnant women should be moderately physically active every day of the week for at least 30 minutes. The term moderate is thoroughly and clearly defined in the guidelines. Resistance exercises during pregnancy are safe but it is advised to use light loads and a large number of repetitions (e.g. 15-20 repetitions. Strength exercises for the pelvic floor muscles deserves a special place during pregnancy. Appropriate forms of physical activity for pregnant women are walking and jogging, swimming and aquatic exercise, cycling, Pilates and yoga, aerobics, fitness and cross-country skiing. Certain forms of physical activity need special adjustments (alpine skiing, ice skating and rollerblading, racket sports, team ball games, horseback riding and scuba diving. 

  8. Nutritional Patterns in Pregnant Women Referred to Yasuj Health Care Centers

    Directory of Open Access Journals (Sweden)

    Seyed Mohammad Amin Rezaei

    2017-12-01

    Full Text Available Background: The quality and quantity of nutrition during pregnancy is very important. This study aimed at determining the nutritional patterns in pregnant women referred to Yasuj Health Care Centers. Methods: In this cross-sectional study, 360 pregnant women in the third trimester of pregnancy referred to Yasuj Health Care Centers were enrolled. FFQ questionnaire was used to determine the nutritional patterns. Results: The mean age was 26.4±4.9 years. Totally, 67.2% of pregnant women used frying as the method of cooking. Solid oils were used for cooking in 21.7% of participants. Monthly consumption of carbonated beverages was higher than milk and 67.5% of women received more and 24.2% received less calories than needed and only 8.3% received calories equivalent to their need. Totally, 81.1%, 63.3%, 55% 48.9%, and 83.9% iron, zinc, calcium, magnesium and folate were less than recommendation by the RDA, respectively. Conclusion: The result of the present study revealed that the intakes of fruits, vegetables and some micronutrients such as iron, zinc, calcium, magnesium and folate were less than recommendations in pregnant women in Yasuj. But fat intake and the intakes of food items in miscellaneous group were more than the recommendations. Nutritional educational programs seems necessary in order to create a healthy and desirable food pattern in this group.

  9. Physical and biological responses to an alternative removal strategy of a moderate-sized dam in Washington, USA.

    Science.gov (United States)

    Shannon Claeson; B. Coffin

    2015-01-01

    Dam removal is an increasingly practised river restoration technique, and ecological responses vary with watershed, dam and reservoir properties, and removal strategies. Moderate-sized dams, like Hemlock Dam (7.9m tall and 56m wide), are large enough that removal effects could be significant, but small enough that mitigation may be possible through a modified dam...

  10. Non uniform nature of recorded ground accelerations at dam foundation interface

    Energy Technology Data Exchange (ETDEWEB)

    Ghaemian, Mohsen; Gilani, Morteza Sohrabi [Sharif University of Technology, Tehran, (Iran, Islamic Republic of); Noorzad, Ali [Power and Water University of Technology, Tehran, (Iran, Islamic Republic of)

    2010-07-01

    The Karun III is a double curved concrete arch dam located in Iran which was used to investigate earthquake motions and dam responses. This paper presented the study of the Karun III dam foundation interface. Using an array of 15 accelerometers, two major events that occurred on 2007.11.20 and 2007.11.21 were recorded during dam operation with a PGA at crest of 0.312 g and 0.109.g respectively. A finite element model of Karun III dam was performed. The response of the Karun III dam during the 2007 earthquake was investigated using the NSAD-DRI program. It was found that the motion of the dam foundation interface is non-uniform. There is a time shift and amplification at the abutment compared to those at the base of the dam. The results showed that the spatially varying earthquake assumption is in good agreement with the recorded displacement of the dam.

  11. Evaluating the Mosul Dam's Instability after Resumption of Maintenance

    Science.gov (United States)

    Al-husseinawi, Y.; Li, Z.; Clarke, P. J.; Edwards, S.

    2017-12-01

    There is serious concern about the safety of Mosul dam in the north of Iraq. Millions of people in the downstream area are exposed to risk of catastrophic collapse of this dam due to its soluble foundation. Recent study (Milillo et al., 2016, Scientific Report/10.1038/srep37408) reported that the dam deformation has accelerated since August 2014, when grouting operations were interrupted due to the conflict in the region. In this study, we investigate the health of Mosul dam since Jun 2016 using three independent datasets: Sentinel-1A/B SAR images, levelling, and GPS measurement. The latter are based on three epochs of terrestrial observation for levelling and GPS data: March 2016, December 2016 and July 2017. During this period, maintenance operations are being recovered to keep the dam stable. The monitoring network, on which the levelling and GPS observations are based, consists of eighty-seven pillars distributed on the dam surface. The results from InSAR and leveling data show that the dam crest is settling by 9 mm/yr. In contrast to previous studies, our results show a deceleration in the settlement. This may be due to the maintenance operations performed in the last few months. InSAR time series analysis was performed using the in-house tool TM-SBAS. When using the small baseline Sentinel-1 constellation, all possibilities of image choice are taken into consideration and the SRTM DEM accuracy is sufficient to generate the differential interferograms. Data from both Sentinel-1A and -1B images are used, and these results can be compared with multi-platform (Envisat, Sentinel-1, Cosmo-SkyMed, and TerraSar-X) data collected during the period between March 2003 and September 2016.

  12. The behaviour of a large dam at severe frost

    Directory of Open Access Journals (Sweden)

    M. C. SPADEA

    1972-06-01

    Full Text Available Synthesizing the problem, the action of the thrusts in the
    behaviour of t h e dam of Pieve di Cadore, makes itself conspicuous expecially
    during three periods of the year:
    1. - About the end of June, the air temperature, 011 t h e average, overcomes
    the water one in the watershed upstream the dam: the bending of
    t h e dam upstream increases from the bottom to the top.
    2. - About the end of October, the thermal conditions change; the
    mean air temperature grows lower than the mean water temperature; the
    dam begins her bending dowstream.
    3. - When the air temperature is distinctly below 0 °C, the action of
    t h e t h r u s t s grows more complexe; t h e rocky waterlogged system downstream
    of t h e dam, while cooling, swells and pushes t h e bottom of t h e dam upstream;
    at t h e higher quote, on the contrary, the t h r u s t downstream continues.
    When the strenght limit of the medium is surpassed, arises a contrast
    between the rocky system and the concrete structure: this contrast can origin
    a t e very small fractures, revealed from seismic station installed into the
    central ashlar (XIV a t 660 metres height of t h e dam, under t h e form of microshocks
    which energy is of about 10I0-10U erg.

  13. The blind men meet the elephant at the dam: Alternative spatial and taxonomic components reveal different insights about how low-head dams impact fish biodiversity

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Smith, Joseph M.; Hitchman, Sean M.

    2017-01-01

    Dams are ubiquitous environmental impacts that threaten aquatic ecosystems. The ability to compare across research studies is essential to conserve the native biodiversity that is impacted by the millions of low‐head dams that currently fragment streams and rivers. Here, we identify a previously unaddressed obstacle that impedes this generalization. Specifically, divergent spatial and taxonomic approaches that result from different conceptualizations of the dam‐biodiversity problem can produce conflicting science‐based conclusions about the same dam impact. In this research, using the same dammed and undammed sites, we evaluated the scientific generality of different conceptualizations of the dam‐biodiversity problem. We compared two different but commonly used spatial approaches—(1) above dam–below dam vs. (2) undammed–dammed comparisons—and 11 different, commonly used taxonomic approaches (three assemblage summaries, eight guilds). Sites above the dam structure had less diverse fish assemblages than sites below dams, whereas sites below the dam structure were similar to undammed sites. Thus, spatial approach 1 detected a large dam effect and spatial approach 2 detected a small dam effect. Similarly, some taxonomic responses (species richness, diversity, abundance, and number of guilds) detected large dam effects; other responses detected small (riffle specialist guild) or no dam effects (pool generalists). In summary, our results showed that how the problem was framed altered scientific conclusions and created different dam realities. The metaphor of how individual blind men disagree about the structure of an elephant, based on examinations of different body parts, reinforces the need for a coordinated, holistic perspective on dam research. Although no single approach is adequate for all problems, identifying the form, consequences of, and relationships among different research conceptualizations will set the stage for future syntheses of dam

  14. Arc structure of the DAM Jupiter Emission

    International Nuclear Information System (INIS)

    Leblanc, Y.

    1981-01-01

    An analysis of the dynamic spectra of the Jovian DAM emission (1.3--40 MHz) has been made from Voyager data; it appears that the different Jovian 'sources' can be defined by spectral chaaracteristics, rather than by occurrence probability. The non-Io emission consists of two families: vertex early arcs (VEA) and vertex late arcs (VLA). These two families are superimposed at all longitudes, but one is always more intense than the other. The characterics of the two families are specified; in particular, it is shown that the VEA family is more stable in time than the VLA family. The Io-controlled emission consists of the four sources already known from the ground-based observations in addition to a new source (Io-A')sp, identified by its dynamic spectrum alone. All of the sources are partially superimposed on non-Io emission. The (Io-B)sp and (Io-A')sp sources are made up of low-curvature arcs having low-frequency limits above 5 MHz. The high-frequency limit of the (Io-B)sp source is strongly modulated by Io-phase. The (Io-A)sp source has a specturm similar to the non-Io VLA emission. The other two sources, (Io-C)sp and (Io-D)sp, are not structured into well-defined arcs. A comparsion is made between the occurrence of these sources in the Io-CML plane with the sources defined from ground observations by probability of occurrence. Local time effects are observed only in the non-Io emission when compared before and after encounter. Before encounter, the VEA family is very weak and the VLA family very intense. After encounter, the opposite effect is observed. The Io-controlled sources are not affected by these local time effects

  15. Raltegravir versus lopinavir/ritonavir for treatment of HIV-infected late-presenting pregnant women.

    Science.gov (United States)

    Brites, Carlos; Nóbrega, Isabella; Luz, Estela; Travassos, Ana Gabriela; Lorenzo, Cynthia; Netto, Eduardo M

    2018-06-01

    Background Late-presenting pregnant women pose a challenge in the prevention of HIV-1 mother-to-child-transmission. We compared the safety and efficacy of raltegravir and lopinavir/ritonavir for this population. Methods We did a single-center, pilot, open-label, randomized trial in Brazil (N = 44). We randomly allocated late-presenting HIV-infected pregnant women (older than 18 years with a plasma HIV-1 RNA >1000 copies/mL) to receive raltegravir 400 mg twice a day or lopinavir/ritonavir 400/100 mg twice a day plus zidovudine and lamivudine (1:1). The primary endpoint was virological suppression at delivery (HIV-1 RNA HIV-infected late-presenting pregnant women.

  16. HSV Serologic Testing for Pregnant Women: Willingness to Be Tested and Factors Affecting Testing

    Directory of Open Access Journals (Sweden)

    David A. Baker

    2011-01-01

    Full Text Available Objective. This prospective study was undertaken to evaluate pregnant women's willingness to undergo HSV type-specific serologic testing and factors affecting willingness in an obstetrics/gynecology ambulatory unit. Methods. At prenatal Visit 1, pregnant women (n=303 with no history of HSV-2 were tested for HSV-1/HSV-2 before and after they received counseling on genital and neonatal herpes. Results. In both the Unwilling Subgroup and the group that changed from being willing to being unwilling, the most common reasons for choosing not to be tested were not being at risk for genital herpes, being tested is too personal, and concern about what will be done with the results. Of the 134 participants in the Willing/Tested Subgroup, 27 (20% were HSV-2 seropositive and 81 (60% were HSV-1 seropositive. Conclusions. These results support the feasibility of HSV serologic testing and counseling in pregnant women.

  17. Dams. Bulletin of the technical service of electric power and big dams; Barrages. Bulletin du service technique de l`energie electrique et des grands barrages

    Energy Technology Data Exchange (ETDEWEB)

    Davard, J.

    1997-12-31

    The Dams bulletin reports on technical news concerning big French dams in operation. This issue comprises 5 papers. Two of them are examples of granting problems which led to the dismantling of the dams of Kernansquillec (Cotes d`Armor, France) and Maisons-Rouges (Indre-et-Loire, France) for economical and environmental reasons. The 3 other papers concern the life of French dams (technical control reports of the French dams in operation), the activities of the control service (annual inspections, preparation of draining operations, renewing of granting), and some general information (organisation of competent authorities, colloquium reports, hydro-power production during the first quarter of 1997). (J.S.)

  18. Large Dam Effects on Flow Regime and Hydraulic Parameters of river (Case study: Karkheh River, Downstream of Reservoir Dam

    Directory of Open Access Journals (Sweden)

    Farhang Azarang

    2017-06-01

    Full Text Available Introduction: The critical role of the rivers in supplying water for various needs of life has led to engineering identification of the hydraulic regime and flow condition of the rivers. Hydraulic structures such dams have inevitable effects on their downstream that should be well investigated. The reservoir dams are the most important hydraulic structures which are the cause of great changes in river flow conditions. Materials and Methods: In this research, an accurate assessment was performed to study the flow regime of Karkheh river at downstream of Karkheh Reservoir Dam as the largest dam in Middle East. Karkheh River is the third waterful river of Iran after Karun and Dez and the third longest river after the Karun and Sefidrud. The Karkheh Dam is a large reservoir dam built in Iran on the Karkheh River in 2000. The Karkheh Reservoir Dam is on the Karkheh River in the Northwestern Khouzestan Province, the closest city being Andimeshk to the east. The part of Karkheh River, which was studied in this research is located at downstream of Karkheh Reservoir Dam. This interval is approximately 94 km, which is located between PayePol and Abdolkhan hydrometric stations. In this research, 138 cross sections were used along Karkheh River. Distance of cross sections from each other was 680m in average. The efficient model of HEC-RAS has been utilized to simulate the Karkheh flow conditions before and after the reservoir dam construction using of hydrometric stations data included annually and monthly mean discharges, instantaneous maximum discharges, water surface profiles and etc. Three defined discharges had been chosen to simulate the Karkheh River flow; maximum defined discharge, mean defined discharge and minimum defined discharge. For each of these discharges values, HEC-RAS model was implemented as a steady flow of the Karkheh River at river reach of study. Water surface profiles of flow, hydraulic parameters and other results of flow regime in

  19. Validity of Self-Reported Periodontal Disease Questionnaire among Pregnant Women.

    Science.gov (United States)

    Chiga, Sakura; Ohba, Takashi; Tanoue, Daisuke; Kawase, Hiromi; Katoh, Takahiko; Katabuchi, Hidetaka

    2016-01-01

    As part of the Kumamoto RAINBOW Project, a multifaceted implementation of the prevention of premature labor, we investigated pregnant women's oral health status and assessed the validity of a self-reported periodontal disease questionnaire. We examined the oral health status of pregnant women and asked them for subjective descriptions of symptoms of periodontitis both in the first and the second half of their pregnancy in Kumamoto Prefecture from August 2012 to January 2014. The Community Periodontal Index (CPI) was used to assess the periodontal condition, and women having periodontal pockets with depths of ≥4 mm were catecogorized as having periodontitis. The results were the scores of the self-questionnaire for periodontal disease prepared by the Japan Dental Association. Of the 9,527 pregnant women who received periodontal check- ups during the first half of pregnancy, 32 percent were diagnosed as having periodontitis. The self-questionnaire had a sensitivity of 51.2% and a specificity of 62.9% for pregnant women to predict their periodontal disease. Then, we evaluated the importance of each question by logistic regression analysis and extracted the useful items. An increased sensitivity (79.9%) was obtained with the best of the modified questionnaire. To our knowledge, this is the first report of the evaluation of the usefulness of the self-reported periodontal disease questionnaire for pregnant women. The current self-questonnaire used for the general adult population was less sensitive for pregnant women. Our modified questionnaire showed an improved sensitivity for diagnosing periodontitis, but its specificity remained low. A specialized self-questionnaire for periodontal disease in pregnant women should be designed.

  20. Zika Virus Infection Among U.S. Pregnant Travelers - August 2015-February 2016.

    Science.gov (United States)

    Meaney-Delman, Dana; Hills, Susan L; Williams, Charnetta; Galang, Romeo R; Iyengar, Preetha; Hennenfent, Andrew K; Rabe, Ingrid B; Panella, Amanda; Oduyebo, Titilope; Honein, Margaret A; Zaki, Sherif; Lindsey, Nicole; Lehman, Jennifer A; Kwit, Natalie; Bertolli, Jeanne; Ellington, Sascha; Igbinosa, Irogue; Minta, Anna A; Petersen, Emily E; Mead, Paul; Rasmussen, Sonja A; Jamieson, Denise J

    2016-03-04

    After reports of microcephaly and other adverse pregnancy outcomes in infants of mothers infected with Zika virus during pregnancy, CDC issued a travel alert on January 15, 2016, advising pregnant women to consider postponing travel to areas with active transmission of Zika virus. On January 19, CDC released interim guidelines for U.S. health care providers caring for pregnant women with travel to an affected area, and an update was released on February 5. As of February 17, CDC had received reports of nine pregnant travelers with laboratory-confirmed Zika virus disease; 10 additional reports of Zika virus disease among pregnant women are currently under investigation. No Zika virus-related hospitalizations or deaths among pregnant women were reported. Pregnancy outcomes among the nine confirmed cases included two early pregnancy losses, two elective terminations, and three live births (two apparently healthy infants and one infant with severe microcephaly); two pregnancies (approximately 18 weeks' and 34 weeks' gestation) are continuing without known complications. Confirmed cases of Zika virus infection were reported among women who had traveled to one or more of the following nine areas with ongoing local transmission of Zika virus: American Samoa, Brazil, El Salvador, Guatemala, Haiti, Honduras, Mexico, Puerto Rico, and Samoa. This report summarizes findings from the nine women with confirmed Zika virus infection during pregnancy, including case reports for four women with various clinical outcomes. U.S. health care providers caring for pregnant women with possible Zika virus exposure during pregnancy should follow CDC guidelines for patient evaluation and management. Zika virus disease is a nationally notifiable condition. CDC has developed a voluntary registry to collect information about U.S. pregnant women with confirmed Zika virus infection and their infants. Information about the registry is in preparation and will be available on the CDC website.

  1. Recruiting pregnant smokers from Text4baby for a randomized controlled trial of Quit4baby.

    Science.gov (United States)

    Leavitt, Leah; Abroms, Lorien; Johnson, Pamela; Schindler-Ruwisch, Jennifer; Bushar, Jessica; Singh, Indira; Cleary, Sean D; McInvale, Whitney; Turner, Monique

    2017-06-01

    Recruiting pregnant smokers into clinical trials is challenging since this population tends to be disadvantaged, the behavior is stigmatized, and the intervention window is limited. The purpose of this study is to test the feasibility and effectiveness of recruiting pregnant smokers into a smoking cessation trial by sending recruitment text messages to an existing subscriber list. Recruitment messages were sent to subscribers flagged as pregnant in Text4baby, a national text messaging program for pregnant women and mothers. Four recruitment messages were rotated to test the effectiveness of different emotional frames and a financial incentive. Study staff called subscribers who expressed interest to screen for eligibility and enroll eligible women. Between October 6, 2015 and February 2, 2016, 10,194 recruitment messages were sent to Text4baby subscribers flagged as pregnant, and 10.18% (1038) responded indicating interest. No significant increase in cancellation was observed compared to subscribers who received other ad hoc messages. Of respondents, 54.05% (561) were reached by phone for follow-up, and 21.97% (228) were found to be eligible. Among the eligible, 87% (199) pregnant smokers enrolled. The recruitment message with a pride emotional appeal had a significantly higher response (p = 0.02) compared to the recruitment message with no emotional appeal, but enrollment did not significantly differ between recruitment messages with different emotional appeals. The recruitment messages with a reference to financial incentive yielded higher response (p < 0.01) and enrollment (p = 0.03) compared to a recruitment message without. This study demonstrates success recruiting pregnant smokers using text message. Future studies should consider building on this approach for recruiting high-risk populations.

  2. Putting Roman Dams in Context: a Virtual Approach

    Science.gov (United States)

    Decker, M. J.; Du Vernay, J. P.; Mcleod, J. B.

    2017-08-01

    Water resources and management have become a critical global issue. During the half-millennium of its existence, the Roman Empire developed numerous strategies to cope with water management, from large-scale urban aqueduct systems, to industrial-scale water mills designed to cope with feeding growing city populations. Roman engineers encountered, adopted, and adapted indigenous hydraulic systems, and left lasting imprints on the landscape of the Mediterranean and temperate Western Europe by employing a range of water technologies. A recent academic study has enabled the identification of remains of and references to seventy-two dams from the Roman era, constructed in Spain between the 1st and 4th century AD. Such unique heritage, without comparisons in the Mediterranean makes Spain an emblematic case study for the analysis of Roman hydraulic engineering and water management policies. Fifty dams have been located and detailed. The twenty-two outstanding, although identified on the ground, have not been able to be acceptably characterized, due in some cases to their being ruins in a highly degraded state, others due to their being masked by repairs and reconstructions subsequent to the Roman era. A good example of such neglected dams is the buttress dam of Consuegra , in Toledo province (Castilla-La Mancha). Dating to the 3rd - 4th century AD, the Dam of Consuegra, on the basin of the Guadiana, with its over 600 metres length and 4,80 metres height, is a remarkable case of Roman engineering mastery. It had a retaining wall upstream, numerous buttresses and perhaps an embankment downstream, of which no remains are left. The application of 3D digital imaging technique to create a high quality virtual model of such monuments has proved to be successful especially for the study of the technological aspects related its construction. The case study of the Roman dam of Muel (Zaragoza) has shown, in fact, as best practices in digital archaeology can provide an original and

  3. Detection of water leaks in the dam Joumine and study of sedimentation in the dam Ghezela by nuclear method

    International Nuclear Information System (INIS)

    Sari Souha

    2013-01-01

    The objective of this study is to determinate the paths of leaks observed in the dam Joumine and to identify the origin of salinity in the drain D2. In addition, the evaluation of the sedimentation measurement of suspended elements in the dam Ghezela is our second objective. The Joumine dam located in the North-east of Tunisia (governorate of Bizerte), was built in 1983 has an upstream watershed area of 418 km 2 . The reservoir capacity is 130 Mm 3 . This dam observed a water leakage from its implementation at the two drains D1 and D2 with a emerging flow rate reached a value close to 500 l/s, about 16 pour cent of its capacity. The injection of an insulating material in Karsts networks reduces the leakage rate to a value of 120 l / s in 1993 and 88 l / s in 2013, but this decrease was accompanied by an increase in salinity level in D2. The results from a multidisciplinary approach showed that the leakage path from the left bank of the reservoir where the leak was first detected, heading both D1 and D2 drains and the salinity in drain D2 due to the dissolution of the gypsum layer downstream of the dam and the contribution of brackish water from the left bank. The Ghezela dam located in the same area, was built in 1984 has an upstream watershed area of 48 km 2 . This dam has been an increase in sedimentation of 0.3 million m3 in 1994 to 1.7 million m 3 in 2010. In this study, the suspended elements were measured with a nuclear probe composed by a radioactive source of americium 241 and a NaI detector trained by a boat at different depth in the reservoir.

  4. Dentist's opinion toward treatment of pregnant patients

    International Nuclear Information System (INIS)

    AlSadhan, Raed; AlManee, Abdullatif

    2008-01-01

    The aim of this study was to assess the awareness of dentists in Riyadh city about treatment alternatives available for pregnant patients. A self-administered questionnaire was distributed among 500 dentists practicing in Riyadh city. The questionnaire included data on dentists socio-demographic and practice characteristics in addition to management choices of the pregnant dental patient such as dental treatment practices and selected therapeutic choices. Out of the questionnaires distributed, 212 questionnaires were collected (42.5% response rate). Most of the participants were general practitioners, with less than 5 years clinical experience, who obtained their degree from local institutes and practiced in the government sectors. Over half of the participants stated that they would radiograph a pregnant patient who was suffering from pain from a tooth with doubtful diagnosis or would extract a non-restorable painful tooth. Two-thirds of the participating dentists would not replace a missing molar with a fixed partial denture during pregnancy. The majority of the participants (86%) would give oral hygiene instructions, prescribe a mouthwash and do scaling and/or root planing for a pregnant patient with gingival bleeding and calculus deposits. In respect to antibiotics, the majority of the dentists (96%) would prescribe amoxicillin to a pregnant patient. Of the four analgesic agents surveyed, paracetamol was the most popular analgesic agent (96.7%). On the use of local anesthetics, the majority of the dentists (75%) would use lidocaine without vasoconstrictor and would not use prilocaine with felypressin vasoconstrictor. The study showed that there was a lack of knowledge about the clinical management of the pregnant dental patients among the surveyed dentists regardless of their socio-demographic and practice characteristics necessitating continuous dental education programs on the dental management of pregnant dental patients. (author)

  5. Happiness and related factors in pregnant women.

    Science.gov (United States)

    Jayasvasti, Kanthika; Kanchanatawan, Buranee

    2005-09-01

    Pregnancy is a crisis in the human life cycle as an important turning point in aspects of anatomical, physiological and psychosocial changes. An unhappy pregnanus could influence the fetal growth and development and sense of maternal competence as well as bonding with the fetus which profoundly affect the nurture of the infant after delivery. The authors'purposes were to study happiness and related factors in pregnant women having antenatal care at King Chulalongkorn Memorial Hospital. Four hundred and thirty-eight pregnant women from the antenatal clinic at King Chulalongkorn Memorial Hospital were randomly selected to complete a set of questionnaires that consisted of personal information, pregnant information, The Oxford Happiness Questionnaire (OHQ), The Maudsley Personality Inventory (MPI) and The Marital Satisfaction Scale (MSS). Prevalence of happiness level was classified by descriptive analysis. Unpaired t-test, ANOVA and Pearson's Product Moment Correlation analyzed related factors to happiness in pregnant woman. Also Stepwise Multiple Regression Analysis was used to define predictive factors for happiness in pregnant women. The sample had a high level of happiness of 57.3%. Significant related factors to happiness were age between 31-35 years, high education level, high individual and family income, having saving deposition, no drug abuse, improved marital relationship, no conflict with relatives, extrovert and stable personality types and no concerns about post-partum body image. Four predictive factors for happiness in pregnant women were extrovert personality, stable personality, high family income and improved marital relationship. Level of happiness in pregnant women could be predicted by type of personality, family income and marital relationship.

  6. PRODUCTIVITY COMPARISON BETWEEN BOER AND KACANG GOAT DAM

    Directory of Open Access Journals (Sweden)

    S. Elieser

    2014-10-01

    Full Text Available A study to evaluate the productivity of Boer and Kacang goats dam was carried out for 2 years atResearch Institute for Goat Production, Sungei Putih-North Sumatera. The materials used were goatsowned by the institute. The parameters observed were total birth and weaning weights of kid, litter size,parity of dam, pre-weaning mortality and kidding interval. The rate of reproduction and productivity ofthe dam were estimated using Amir and Knipscheer methods and were statistically analyzed usingGeneral Linear Model. The results showed that the total birth and weaning weight of Boer goats werehigher (P<0.05 than that of Kacang goats, while litter size of Boer goats were higher (P<0.05 than thatof Kacang goats. The pre-weaning mortality of Boer goat 15.1 ± 6.02% was lower than that ofKacang. The kidding interval of Boer goats was higher (P<0.05 than that of Kacang. Parity of dam hadsignificant effect on all production traits (P<0.05 except for pre-weaning mortality. Dam reproductionrate of Boer (1.81 was higher than that of Kacang (1.78, while productivity of Boer goat (37.12kg/head/year was higher than that of Kacang (18.12. It can be concluded that the reproductivity ofBoer and Kacang goats were similar, however the productivity of Boer goat had better than Kacang.

  7. Sinkhole formation mechanism at Steinaker Dam : the complete story

    Energy Technology Data Exchange (ETDEWEB)

    Dise, K. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case history summary described an internal erosion event that occurred at a zoned earthfill dam located within the Ashley Creek watershed area of the Uinta Mountain uplift. The incident occurred under static loading. The rocks in the region are heavily fractured with close to moderately spaced joints along the bedding planes. The joints were not grouted during the dam's construction, and the foundation was not treated with dental concrete or slush grouting. The dam's core material consisted of a mixture of clay, silt and sand. A sinkhole area appeared on the downstream face of the dam and was filled. A second sinkhole appeared in 1965. Abutment grouting was performed. A core investigation study in 1992 showed that voids were present in the core. Deep dynamic compaction was used to densify the foundation materials. Voids in the gravel envelope were filled with fine sand. The investigation showed that the sinkholes were formed by seeps travelling through abutment bedrock fractures. The voids were large enough to provide an exit for the fine-grained foundation alluvial materials. It was concluded that grouting the abutment prevented higher velocity seepages that may have eventually initiated a dam breach. 6 figs.

  8. WAC Bennett Dam - the characterization of a crest sinkhole

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, R.A.; Gaffran, P.C. [British Columbia Hydro, Burnaby, BC (Canada); Watts, B.D. [Klohn-Crippen Consultants Ltd., Richmond, BC (Canada); Sobkowicz, J.C. [Thurber Engineering Ltd., Vancouver, BC (Canada); Kupper, A.G. [AGRA Earth and Environmental, Edmonton, AB (Canada)

    1998-11-01

    In June, 1996, a small hole was discovered in the asphaltic concrete road on the crest of the 183 m high WAC Bennett Dam on the Peace River in northeastern British Columbia. Examination of the hole resulted in a sinkhole on the dam crest. The sinkhole was 2.5 m in diameter and 7 m deep. Speculation was that the cavity was likely associated in some way with a buried survey benchmark tube. An investigation was immediately planned and executed to characterize the sinkhole, to determine the extent of damage and the safety status of this very large dam. British Columbia`s Dam Safety Regulator made the decision to lower the reservoir level. During the reservoir drawdown, various surface geophysical techniques were used to investigate the condition of the dam beyond the sinkholes. Intrusive investigations of the sinkhole were also planned. This involved trial drilling and downhole geophysical surveys in intact portions of the core at locations far from the sinkhole. The objectives and criteria developed for the investigation program are summarized. Scope of key activities at the sinkhole and important lessons learned during the investigation are also described. 9 refs., 15 figs.

  9. Estimated strength of shear keys in concrete dams

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, D.D. [Hatch Energy, Niagara Falls, ON (Canada); Lum, K.K.Y. [BC Hydro, Burnaby, BC (Canada)

    2008-07-01

    BC Hydro requested that Hatch Energy review the seismic stability of Ruskin Dam which was constructed in 1930 at Hayward Lake in British Columbia. The concrete gravity dam is founded nearly entirely on rock in a narrow valley. The vertical joints between blocks are keyed and grouted. The strength of the shear keys was assessed when a non-linear finite element model found that significant forces were being transferred laterally to the abutments during an earthquake. The lateral transfer of loads to the abutment relies on the strength of the shear keys. The dynamic finite element analysis was used to determine the stability of the dam. A review of the shear strength measurements reported in literature showed that the measurements compared well to those obtained by BC Hydro from cores taken from Ruskin Dam. The cohesive strength obtained using the Griffith failure criteria was also in good agreement with both sets of measurements. A simple ultimate shear strength equation was developed using the Mohr-Coulomb failure criteria to determine combined cohesive and frictional strength of shear keys. Safety factors of 2.0 for static loads and 1.5 for seismic loads were proposed to reduce the ultimate strength to allowable values. It was concluded that given the relatively high shear strength established for the shear keys, the abutment rock or dam/abutment contact will control the amount of load which can arch to the abutments. 8 refs., 4 tabs., 5 figs.

  10. Pearl Harbor: lessons for the dam safety community

    Energy Technology Data Exchange (ETDEWEB)

    Martin, T.E. [AMEC Earth and Environmental Ltd., Burnaby, BC (Canada)

    2001-10-01

    Every good dam safety program must be based on surveillance and emergency response planning. The same principles apply to the gathering of information for military intelligence and the planning of defence tactics. Lessons learned from failure have spurred the advancement of dam engineering. Dam safety experts can benefit from the inadequacies encountered by the military community, with the most famous occurring on December 7, 1941 in Pearl Harbor. Both intelligence gathering and contingency response planning failed miserably. The data was not properly disseminated, interpreted, analysed. The proper response to the situation was not initiated. Human error and failure to communicate are the two main reasons that explain the debacle. The inquiries into the tragedy at Pearl Harbor provided valuable lessons, related to individual and organizational failures, which the authors shared in this presentation. The relevance to dam safety was made. All Federal Bureau of Investigation (FBI) agents must read the lessons drawn from Pearl Harbor, as they have responsibility for dam safety. 4 refs.

  11. The Sulphate Effect on Lijiaxia Concrete Dam (China Gallery

    Directory of Open Access Journals (Sweden)

    Xufen Zhu

    2017-01-01

    Full Text Available The concrete degradation is one of the most serious problems for a dam construct during the normal operation, which determines the dam service life. Hence, it is very important to reduce the extent of the dam concrete degradation for the safety of the dam normal operation. Here, Lijiaxia hydroelectric station is taken as an example, and a comprehensive method to assess the sulphate effect on dam gallery is proposed. Eleven samples in total were taken from three difference locations by the drill bore. The microstructural investigations including X-ray fluorescence spectrometry (XRF, X-ray diffraction (XRD, scanning electron microscope (SEM, and energy dispersive spectroscopy (EDS were conducted to assess the sulphate attack and the degradation degree. Meanwhile, the water chemical analysis was applied to reveal the mechanism of concrete degradation. The experimental and analysis results indicate that the concrete degradation degree varies with the location of the samples. The components of the concrete change and the content of SO3 increase dramatically during degradation. Moreover, the mineral facies of the concrete change correspondingly, with the cement paste substituted by the calcite, calcium vitriol, and gypsum. The reinforcement and precaution measures are suggested based on the results of the degradation assessment.

  12. Priority ranking for maintenance activities on embankment dams

    International Nuclear Information System (INIS)

    Chouinard, L.E.; Andersen, G.R.; Robichaud, J.G.; Blanchette, G.; Gervais, R.

    1998-01-01

    Operators of dams in Canada and the U.S. are steadily shifting from construction of new facilities to the maintenance and repairs of existing ones. This paper emphasized the importance of prioritizing maintenance activities on embankment dams whose maintenance needs vary from structure to structure. Two parallel procedures were developed, one for monitoring devices and the other for defense groups. Both procedures are intended to be used together to rate the condition of the embankment dams. The term 'defense groups' is used to refer to the collection of physical components on dams to prevent adverse conditions from occurring that would result in an uncontrolled release of the reservoir. The priority rankings and condition indices developed by means of this procedure reflects the judgment of a panel of engineers and geologists who implement them. They are not to be interpreted as an index of dam safety. While the process is sufficiently well developed to warrant wide-spread distribution, it is considered to be still in the developmental stage. Therefore, it should be used in conjunction with other parallel processes evaluating structural, mechanical and electrical features of the structure under consideration. 6 refs., 7 tabs

  13. Identification of Cracked Zone in Sutami dam Using Geoelectrical Method

    Directory of Open Access Journals (Sweden)

    Fina Fitriah

    2015-12-01

    Full Text Available We identified the craked zones based on geoelectrical resistivity method in Sutami Dam. There are four lines measurement of geoelectrical resistivity method with a length of 380-400 meters. The direction of each line is from the northeast to the southwest. All of the tracks are located at the top of Sutami Dam i.e. two tracks in the upstream and the others in the downstream. From the analysis we found that the lithology is detected by geoelectrical resistivty method showed two layers of design of Sutami Dam. The two layers that are detected are transition zone and filter zone. Transition zone consists of sandstone rock containing water (0.922 Ωm-9.57 Ωm and dry sandstone (>9.57 Ωm-320 Ωm. Filter zone consists of sand (>320 Ωm-4410 Ωm. Cracked zones spread in the upstream, downstream, and roadway at the top of Sutami Dam which are indicated by the presence of low resistivity (0.922 Ωm-9.57 Ωm based on 3D processing of data of geoelectrical resistivity. The distribution of cracked zone indicates that Sutami Dam is susceptible to ground movement.

  14. Fragmentation of Andes-to-Amazon connectivity by hydropower dams.

    Science.gov (United States)

    Anderson, Elizabeth P; Jenkins, Clinton N; Heilpern, Sebastian; Maldonado-Ocampo, Javier A; Carvajal-Vallejos, Fernando M; Encalada, Andrea C; Rivadeneira, Juan Francisco; Hidalgo, Max; Cañas, Carlos M; Ortega, Hernan; Salcedo, Norma; Maldonado, Mabel; Tedesco, Pablo A

    2018-01-01

    Andes-to-Amazon river connectivity controls numerous natural and human systems in the greater Amazon. However, it is being rapidly altered by a wave of new hydropower development, the impacts of which have been previously underestimated. We document 142 dams existing or under construction and 160 proposed dams for rivers draining the Andean headwaters of the Amazon. Existing dams have fragmented the tributary networks of six of eight major Andean Amazon river basins. Proposed dams could result in significant losses in river connectivity in river mainstems of five of eight major systems-the Napo, Marañón, Ucayali, Beni, and Mamoré. With a newly reported 671 freshwater fish species inhabiting the Andean headwaters of the Amazon (>500 m), dams threaten previously unrecognized biodiversity, particularly among endemic and migratory species. Because Andean rivers contribute most of the sediment in the mainstem Amazon, losses in river connectivity translate to drastic alteration of river channel and floodplain geomorphology and associated ecosystem services.

  15. Haggart Island dams : reconstruction/rehabilitation feasibility study : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-03-15

    This feasibility study was conducted to identify and evaluate the range of options available for the repair or reconstruction of the Haggart Island Dams, and to provide the required information needed to decide upon the preferred solution and secure funding for the final design for reconstruction. In addition, the study presented the initial stages needed to satisfy the environmental assessment process regarding the selection of options related to the structures. Information relating to: fish habitat; flood mapping; historical flow data; condition of the dams; historical significance of the dams and their relation to the area; recreational opportunities for the area and previous public consultation records was presented. Issues regarding water level were addressed through a hydraulic analysis. Field and background data were compiled in order to establish the existing conditions of the study area. Background information regarding the natural features of the study area was presented. Safety issues were assessed in developing landscaping features and pathway planning. Details of public consultation procedures were presented. Information from stakeholders was gathered regarding recreational activities, river flow, historical and nature related issues to develop an understanding of the significance of the dams. Various design alternatives were presented, as well as details of the current, deteriorating state of the dams. 5 tabs., 24 figs.

  16. A comparison of the prevalence of malaria parasitaemia in pregnant and non pregnant women.

    Science.gov (United States)

    Nnaji, G A; Ikechebelu, J I; Okafor, C I

    2009-01-01

    To compare the prevalence of malaria parasitaemia and the mean parasite density in pregnant women at first antenatal visit with those of the control subjects at Nnamdi Azikiwe University Teaching Hospital, Nnewi. A case control prospective survey using a structured questionnaire to collect data from pregnant women attending antenatal clinic between 1 April and 30 September 2001 and matched controls at the GOPD during the same period. Peripheral blood smears were examined in 420 pregnant women at their first antenatal visit and 200 control subjects to compare the prevalence of malaria parasitaemia and mean parasite density in pregnant women and controls. The prevalence of parasitaemia was 79.3 percent (i.e. 333 of 420) for pregnant women and 31.5 percent (or 63 of 200) for the control. For both pregnant women and controls, an overall prevalence of 63.1 percent was observed. The study found the mean parasite density for the pregnant women to be 1978 +/- 1531 (Mean +/- SD), while that of the controls was 766 +/- 1923. This study demonstrates the higher prevalence of malaria parasitaemia and mean parasite density in pregnant women when compared with the matched controls.

  17. "It's like a puzzle": Pregnant women's perceptions of professional support in midwifery care.

    Science.gov (United States)

    Bäckström, Caroline A; Mårtensson, Lena B; Golsäter, Marie H; Thorstensson, Stina A

    2016-12-01

    Pregnant women are not always satisfied with the professional support they receive during their midwifery care. More knowledge is needed to understand what professional support pregnant women need for childbirth and parenting. Childbearing and the transition to becoming a parent is a sensitive period in one's life during which one should have the opportunity to receive professional support. Professional support does not always correspond to pregnant women's needs. To understand pregnant women's needs for professional support within midwifery care, it is crucial to further illuminate women's experiences of this support. To explore pregnant women's perceptions of professional support in midwifery care. A qualitative study using semi-structured interviews. Fifteen women were interviewed during gestational weeks 36-38. Data was analysed using phenomenography. The women perceived professional support in midwifery care to be reassuring and emotional, to consist of reliable information, and to be mediated with pedagogical creativity. The professional support facilitated new social contacts, partner involvement and contributed to mental preparedness. The findings of the study were presented in six categories and the category Professional support contributes to mental preparedness was influenced by the five other categories. Pregnant women prepare for childbirth and parenting by using several different types of professional support in midwifery care: a strategy that could be described as piecing together a puzzle. When the women put the puzzle together, each type of professional support works as a valuable piece in the whole puzzle. Through this, professional support could contribute to women's mental preparedness for childbirth and parenting. Copyright © 2016 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.

  18. Sleep Duration and Quality in Pregnant Women: A Cross-Sectional Survey in China

    Directory of Open Access Journals (Sweden)

    Xianglong Xu

    2017-07-01

    Full Text Available Objectives: Good maternal health and fetal development require sufficient and good quality of sleep during pregnancy. This study investigated sleep duration and quality in pregnant women, assessing factors with possibly influence on sleep. Method: A cross-sectional survey was conducted on pregnant women between June and August in 2015 in 16 hospitals in five provinces in China. A total of 2345 pregnant women aged 18 years and older were surveyed. Insufficient sleeping duration was defined as sleeping of less than 7 h per day. Excessive sleep duration was defined as sleeping of more than 9 h per day. Results: A total of 561 (23.9% participants reported insufficient sleeping duration, whereas 485 (20.9% claimed excessive sleep duration. A total of 358 (15.2% of pregnant women reported problems regarding sleep quality. Compared to pregnant women with sufficient sleeping duration, those with insufficient sleeping duration were prone to have poor sleep quality, whereas those with excessive sleeping duration featured low possibility of poor sleep quality. High-risk groups of insufficient sleep duration include women of Han nationality, with siblings, in their first trimester of pregnancy, receiving care in low-capacity/quality hospital settings, and with daily or 1–3 days of secondhand smoke exposure. High-risk groups of excessive sleep duration include women living in rural areas, unemployed, in their third trimester of pregnancy, and receiving care in medium-capacity/quality hospital settings. High-risk groups of poor sleep quality include women of non-Han nationality, low income level, in their third trimester of pregnancy, and with insufficient sleep duration. Conclusions: Insufficient/excessive sleep duration and poor sleep quality commonly occur during pregnancy in China. Findings provide a better understanding of the influencing factors of insufficient/excessive sleep duration and poor quality of sleep. These findings have some implications

  19. Effects of leucine supplemented diet on intestinal absorption in tumor bearing pregnant rats

    Directory of Open Access Journals (Sweden)

    de Mello Maria

    2002-04-01

    Full Text Available Abstract Background It is known that amino acid oxidation is increased in tumor-bearing rat muscles and that leucine is an important ketogenic amino acid that provides energy to the skeletal muscle. Methods To evaluate the effects of a leucine supplemented diet on the intestinal absorption alterations produced by Walker 256, growing pregnant rats were distributed into six groups. Three pregnant groups received a normal protein diet (18% protein: pregnant (N, tumor-bearing (WN, pair-fed rats (Np. Three other pregnant groups were fed a diet supplemented with 3% leucine (15% protein plus 3% leucine: leucine (L, tumor-bearing (WL and pair-fed with leucine (Lp. Non pregnant rats (C, which received a normal protein diet, were used as a control group. After 20 days, the animals were submitted to intestinal perfusion to measure leucine, methionine and glucose absorption. Results Tumor-bearing pregnant rats showed impairment in food intake, body weight gain and muscle protein content, which were less accentuated in WL than in WN rats. These metabolic changes led to reduction in both fetal and tumor development. Leucine absorption slightly increased in WN group. In spite of having a significant decrease in leucine and methionine absorption compared to L, the WL group has shown a higher absorption rate of methionine than WN group, probably due to the ingestion of the leucine supplemented diet inducing this amino acid uptake. Glucose absorption was reduced in both tumor-bearing groups. Conclusions Leucine supplementation during pregnancy in tumor-bearing rats promoted high leucine absorption, increasing the availability of the amino acid for neoplasic cells and, mainly, for fetus and host utilization. This may have contributed to the better preservation of body weight gain, food intake and muscle protein observed in the supplemented rats in relation to the non-supplemented ones.

  20. Effects of leucine supplemented diet on intestinal absorption in tumor bearing pregnant rats

    International Nuclear Information System (INIS)

    Ventrucci, Gislaine; Mello, Maria Alice Roston de; Gomes-Marcondes, Maria Cristina Cintra

    2002-01-01

    It is known that amino acid oxidation is increased in tumor-bearing rat muscles and that leucine is an important ketogenic amino acid that provides energy to the skeletal muscle. To evaluate the effects of a leucine supplemented diet on the intestinal absorption alterations produced by Walker 256, growing pregnant rats were distributed into six groups. Three pregnant groups received a normal protein diet (18% protein): pregnant (N), tumor-bearing (WN), pair-fed rats (Np). Three other pregnant groups were fed a diet supplemented with 3% leucine (15% protein plus 3% leucine): leucine (L), tumor-bearing (WL) and pair-fed with leucine (Lp). Non pregnant rats (C), which received a normal protein diet, were used as a control group. After 20 days, the animals were submitted to intestinal perfusion to measure leucine, methionine and glucose absorption. Tumor-bearing pregnant rats showed impairment in food intake, body weight gain and muscle protein content, which were less accentuated in WL than in WN rats. These metabolic changes led to reduction in both fetal and tumor development. Leucine absorption slightly increased in WN group. In spite of having a significant decrease in leucine and methionine absorption compared to L, the WL group has shown a higher absorption rate of methionine than WN group, probably due to the ingestion of the leucine supplemented diet inducing this amino acid uptake. Glucose absorption was reduced in both tumor-bearing groups. Leucine supplementation during pregnancy in tumor-bearing rats promoted high leucine absorption, increasing the availability of the amino acid for neoplasic cells and, mainly, for fetus and host utilization. This may have contributed to the better preservation of body weight gain, food intake and muscle protein observed in the supplemented rats in relation to the non-supplemented ones